Powered by Deep Web Technologies
Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.  

Science Conference Proceedings (OSTI)

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2010, for the fixed sites. Because the AMFs operate episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This first quarter comprises a total of 2,208 possible hours for the fixed sites and the AMF1 and 1,464 possible hours for the AMF2. The average of the fixed sites exceeded our goal this quarter. The AMF1 has essentially completed its mission and is shutting down to pack up for its next deployment to India. Although all the raw data from the operational instruments are in the Archive for the AMF2, only the processed data are tabulated. Approximately half of the AMF2 instruments have data that was fully processed, resulting in the 46% of all possible data made available to users through the Archive for this first quarter. Typically, raw data is not made available to users unless specifically requested.

Sisterson, D. L.

2011-02-01T23:59:59.000Z

2

Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report July 1September 30, 2012  

SciTech Connect

Individual datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile research sites are collected and routed to the Data Management Facility (DMF) for processing in near-real-time. Instrument and processed data are then delivered approximately daily to the ARM Data Archive, where they are made freely available to the research community. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Data Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Voyles, JW

2012-10-10T23:59:59.000Z

3

Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report October 1December 31, 2011  

Science Conference Proceedings (OSTI)

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Voyles, JW

2012-01-09T23:59:59.000Z

4

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 - September 30, 2007  

Science Conference Proceedings (OSTI)

Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

DL Sisterson

2007-10-01T23:59:59.000Z

5

Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report July 1September 30, 2011  

Science Conference Proceedings (OSTI)

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Voyles, JW

2011-10-10T23:59:59.000Z

6

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January 1March 31, 2011  

Science Conference Proceedings (OSTI)

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Data Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Data Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Sisterson, DL

2011-04-11T23:59:59.000Z

7

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report April 1June 30, 2011  

Science Conference Proceedings (OSTI)

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Voyles, JW

2011-07-25T23:59:59.000Z

8

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report: October 1 - December 31, 2010  

Science Conference Proceedings (OSTI)

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Sisterson, DL

2011-03-02T23:59:59.000Z

9

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 September 30, 2006  

Science Conference Proceedings (OSTI)

Description. Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year dating back to 1998.

DL Sisterson

2006-10-01T23:59:59.000Z

10

Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report January 1March 31, 2012  

SciTech Connect

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Data Archive, where they are made available to the research community. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998.

Voyles, JW

2012-04-13T23:59:59.000Z

11

Quarterly Selected Financial and Operating Data  

Reports and Publications (EIA)

Presents quarterly financial data and operating data for a consistent set of major energy companies.

Information Center

2010-11-23T23:59:59.000Z

12

Operation, modification, and maintenance of DOE/PETC 700 H. P. combustion test facility. Quarterly activity report, April 2-July 1, 1979, second quarter  

SciTech Connect

The coal-oil mixture (COM) combustion test program of the 700 H.P. Combustion Test Facility has been performed successfully according to schedule. The parametric coal-oil mixture combustion tests with 30 and 40% coal concentrations were completed. Test data are being analyzed; some meaningful results were obtained. The combustor tests with 50% coal concentration have been initiated. The installation of the new 100 H.P., oil-fired, fire tube boiler for COM combustion studies is on schedule and facility shake down tests are scheduled.

1979-01-01T23:59:59.000Z

13

Operation, modification, and maintenance of DOE/PETC 700 H. P. Combustion Test Facility. Quarterly activity report, January 1, 1979--April 1, 1979  

SciTech Connect

Number six fuel oil tests, 30% COM tests, and 40% COM tests were conducted. Operation, modification, and maintenance of the combustion test facility is described. (LTN)

1979-01-01T23:59:59.000Z

14

PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993  

SciTech Connect

This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

Not Available

1993-10-01T23:59:59.000Z

15

DOE/SC-ARM-11-001 ARM Climate Research Facility Quarterly Instrument...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facility Quarterly Instrument Report Fourth Quarter: October 1-December 30, 2010 JW Voyles January 2011 Work supported by the U.S. Department of Energy, Office of...

16

Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

Not Available

1993-12-31T23:59:59.000Z

17

Projects at the Component Development and Integration Facility. Quarterly technical progress report, October 1--December 31, 1992  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on the projects at the component Development and Integration Facility (CDIF) during the first quarter of FY93. The CDIF is a major US Department of Energy (DOE) test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD proof-of-concept project; mine waste pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

Not Available

1992-12-31T23:59:59.000Z

18

Projects at the Component Development and Integration Facility. Quarterly technical progress report, April 1--June 30, 1993  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project; and Spray Casting Project.

Not Available

1993-12-01T23:59:59.000Z

19

Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994  

Science Conference Proceedings (OSTI)

This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

Not Available

1994-08-01T23:59:59.000Z

20

Power Systems Development Facility. Quarterly report, July 1--September 30, 1996  

SciTech Connect

This quarterly technical progress report summarizes the work completed during the third quarter of a project entitled Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion. The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phase expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

NONE

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

1Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January to March 2002. Data for these indicators are gathered by the Field...

22

4Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"The Facility Representative Program Performance Indicators Quarterly Report is attached, covering the period from October to December 2000. Data for these indicators are gathered by the Field...

23

Electric and hybrid vehicle project. Quarterly report of private-sector operations, first quarter 1982  

DOE Green Energy (OSTI)

As of January 1, 1982 sixteen private-sector site operators at 30 sites in the US were involved in electric and hybrid electric-powered vehicle demonstration programs. Data for 1981 and the first quarter of 1982 are presented on vehicle selection, miles accumulated, energy usage, maintenance requirements, reliability and operating performance for demonstration vehicles at each site. (LCL)

None

1982-06-01T23:59:59.000Z

24

Preparation for Facility Operations RM  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this Standard Review Plan (SRP) on Preparation for Facility Operations is to provide consistency guidance to evaluate the effectiveness of the final project closure of major...

25

Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1--March 31, 1993  

DOE Green Energy (OSTI)

This quarterly technical progress report presents progress on several different projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY93. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept Project; Mine Waste Technology Pilot Program; Plasma Furnace Projects for waste destruction; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; Soil Washing Project for removal of radioactive materials; and Spray Casting Project.

Not Available

1993-09-01T23:59:59.000Z

26

PFBC HGCU test facility technical progress report. First Quarter, CY 1994  

Science Conference Proceedings (OSTI)

This is the eighteenth Technical Progress Report submitted in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. During this quarter, the Tidd Hot Gas Clean Up System operated for 835 hours during six separate test runs. The system was starting into a seventh run at the end of the quarter. Highlights of this period are summarized below: the longest run during the quarter was approximately 333 hours; filter pressure drop was stable during all test runs this quarter using spoiling air to the primary cyclone upstream of the Advanced Particle Filter (APF); the tempering air system was commissioned this quarter which enabled the unit to operate at full load conditions while limiting the gas temperature in the APF to 1,400 F; during a portion of the one run, the tempering air was removed and the filter operated without problems up to 1,450 F; ash sampling was performed by Battelle personnel upstream and downstream of the APF and ash loading and particle size distribution data were obtained, a summary report is included; a hot area on the APF head was successfully repaired in service; a hot spot on the top of an expansion joint was successfully repaired by drilling holes from the inside of the pipe and pumping in refractory insulation; a corrosion inspection program for the HGCU system was issued giving recommendations for points to inspect; filter internal inspections following test runs 13 and 17 revealed a light coating (up to 1/4 inch thick) of residual ash on the candles and some ash bridging between the dust sheds and inner rows of candles. Data from these inspections are included with this report.

Not Available

1994-04-01T23:59:59.000Z

27

Hot Gas Cleanup Test Facility for gasification and pressurized combustion. Quarterly report, October--December 1994  

Science Conference Proceedings (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs. Substantial progress in underground construction activities was achieved during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. MWK equipment at the grade level and the first tier are being set in the structure.

NONE

1995-02-01T23:59:59.000Z

28

Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993  

SciTech Connect

This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

Not Available

1993-12-31T23:59:59.000Z

29

PROJECTIZING AN OPERATING NUCLEAR FACILITY  

SciTech Connect

This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully accomplish deactivation. This concept had to allow for continued operations in FB Line until 2005, while providing distinct task-oriented teams for deactivation of the FCC. Facility workers, always the most knowledgeable about any facility, were integral parts of the project team. The team defined the scope, developed a bottoms-up estimate, reorganized personnel to designated project teams, and developed a baseline schedule with about 12,000 activities. Training was implemented to prepare the facility workers to use project management tools and concepts, which were to execute the project, coordinate activities and track progress. The project budget was estimated at $579 million. The team completed F Canyon and FB Line deactivation in August 2006, four months ahead of schedule and under budget.

Adams, N

2007-07-08T23:59:59.000Z

30

Geothermal Loop Experimental Facility. Quarterly report, January-March, 1979  

DOE Green Energy (OSTI)

The general operations and accomplishments of the Geothermal Loop Experimental Facility during the period from January 1, 1979 through March 31, 1979 are summarized. The construction and installation of a reactor clarifier/media filter system to treat the effluent brine continued. Startup is expected during the next reporting period. Operations of the facility evaluated the two stage flash cycle characteristics of brines from the second production well (Woolsey No. 1). The results were similar to the characteristics of the first production well (Magmamax No. 1) that were reported previously. The 1979 test program has been initiated and preliminary results documented.

Anastas, G.; Bischoff, W.S.; Bishop, H.K.

1979-04-01T23:59:59.000Z

31

Energy & Utilities, Facilities & Operations Directorate, Brookhaven...  

NLE Websites -- All DOE Office Websites (Extended Search)

Homepage The Energy & Utilities (EU) Division operates and maintains BNL's: Electric Distribution System; Central Steam Facility; Central Chilled Water Facility; Potable Water...

32

Power systems development facility. Quarterly report, January 1995--March 1995  

Science Conference Proceedings (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs.

NONE

1995-05-01T23:59:59.000Z

33

Geothermal Loop Experimental Facility. Quarterly report, April-June 1979  

DOE Green Energy (OSTI)

Since the Geothermal Loop Experimental Facility (GLEF) start-up in May, 1976, a substantial amount of information has been obtained on the operation of the plant and its components, brine and steam composition, production and injection wells, and the potential of the Niland Reservoir. The GLEF was modified in April, 1978, from a four stage flash/binary process to a two stage flash cycle for the extraction of energy from a high temperature, high salinity, liquid-dominated resource. A Reactor Clarifier/Media Filter System was put in operation in May, 1979 to demonstrate that suspended solids in the brine could be removed prior to brine injection into the reservoir. The general operations and accomplishments of the GLEF during the period are summarized.

Anastas, G.; Bischoff, W.S.; Bishop, H.K.

1979-07-01T23:59:59.000Z

34

Electric and Hybrid Vehicle Program Site Operator Program Quarterly...  

NLE Websites -- All DOE Office Websites (Extended Search)

the cost of operating the EVcort on electricity equates to 0.87 per gallon of gasoline. The vehicle was transported to the Chicago Soleq facility (1,500 cost to KSU) for...

35

M-Area hazardous waste management facility groundwater monitoring report -- first quarter 1994. Volume 1  

Science Conference Proceedings (OSTI)

This report describes the groundwater monitoring and corrective action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during first quarter 1994 as required by South Carolina Hazardous Waste Permit SC1-890-008-989 and section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. During first quarter 1994, 42 point-of-compliance (POC) wells at the M-Area HWMF were sampled for drinking water parameters.

Evans, C.S.; Washburn, F.; Jordan, J.; Van Pelt, R.

1994-05-01T23:59:59.000Z

36

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January 1-March 31, 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

37

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report January 1-March 31, 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

38

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report October 1-December 31, 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

39

Geothermal Loop Experimental Facility. Quarterly report, January--March 1978  

DOE Green Energy (OSTI)

The Geothermal Loop Experimental Facility (GLEF) utilizes a four stage flash/binary process for the extraction of energy from a high temperature, high salinity, liquid-dominated resource. Since plant start-up in May 1976, a substantial amount of information has been obtained on the operation of the plant, components, brine and steam composition, production and injection wells, and the potential of the Niland Reservoir. The general operation and activities of the GLEF during the period January 1978 through March 1978, are discussed. The production and injection well encountered no unusual difficulties. Scrubber performance tests were rerun this period and are discussed. Steam pH, conductivity, chemical composition, brine and scale properties, pigging, and component optimization efforts are discussed. The injection pump difficulties and condenser plugging problems are detailed. The feasibility study for a 50 MWe plant and H/sub 2/S abatement are discussed.

Bischoff, W.S.; Bishop, H.K.; Cooney, C.S.; Hanenburg, W.H.; Hoaglin, G.J.; Jacobson, W.O.; Mulliner, D.K.; Newell, D.G.; Swanson, C.R.

1978-04-01T23:59:59.000Z

40

Geothermal Loop Experimental Facility. Quarterly report, April--June 1978  

DOE Green Energy (OSTI)

The Geothermal Loop Experimental Facility (GLEF) was modified to use a two stage flash process with two parallel flash trains for the extraction of energy from a high temperature, high salinity, liquid-dominated resource. Since plant start-up in May 1976, a substantial amount of information has been obtained on the operation of the plant, components, brine and steam composition, production and injection wells, and the potential of the Niland Reservoir. The general operation and accomplishments of the GLEF during the period April 1978 through June 1978 are discussed. The GLEF underwent a major redesign. Modifications and inspections of various GLEF equipment and systems are also discussed. Information about the production and injection wells flow testing and instrumentation are discussed. Information regarding coatings and linings for valves and piping is included. In the Chemistry Section there is a wide range of data taken from Brine, Steam, Scale, Binary, Condensate, and Cooling Water Systems.

Bischoff, W.S.; Bishop, H.K.; Cooney, C.S.; Hanenburg, W.H.; Hoaglin, G.J.; Jacobson, W.O.; Mulliner, D.K.; Newell, D.G.; Swanson, C.R.

1978-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

PFBC HGCU Test Facility. Fourth quarterly technical progress report, [October--December 1993  

Science Conference Proceedings (OSTI)

The APF was shut down on September 23, 1993 and no operation was performed during this quarter. This report summarizes inspection, candle reinstallation, retrofit and accelerometer testing conducted during this three month outage.

Not Available

1994-01-01T23:59:59.000Z

42

Office of Headquarters Security Operations - Headquarters Facilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Headquarters Security Operations HomeIntroduction Physical Security Limited Areas and Vault-Type Rooms Personnel Security Foreign Ownership, Control or Influence; Facility...

43

Renewables and Efficiency in State Facilities & Operations  

Energy.gov (U.S. Department of Energy (DOE))

In May 2006, Hawaiis governor signed HB 2175 addressing renewable energy, energy efficiency, and alternative fuels in state facilities and operations. This legislation also detailed requirements...

44

M-area hazardous waste management facility groundwater monitoring and corrective-action report, First quarter 1995, Volume 1  

Science Conference Proceedings (OSTI)

This report, in three volumes, describes the ground water monitoring and c corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during the fourth quarter 1994 and first quarter 1995. Concise description of the program and considerable data documenting the monitoring and remedial activities are included in the document. This is Volume 1 covering the following topics: sampling and results; hydrogeologic assessment; water quality assessment; effectiveness of the corrective-action program; corrective-action system operation and performance; monitoring and corrective-action program assessment; proposed monitoring and corrective-action program modifications. Also included are the following appendicies: A-standards; B-flagging criteria; C-figures; D-monitoring results tables; E-data quality/usability assessment.

NONE

1995-05-01T23:59:59.000Z

45

Operating procedures: Fusion Experiments Analysis Facility  

SciTech Connect

The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

Lerche, R.A.; Carey, R.W.

1984-03-20T23:59:59.000Z

46

Amendment No.: 185. Renewed Facility Operating License  

E-Print Network (OSTI)

Brief description of amendment: The amendments revise the facility operating license to delete Section 2.G.1 of the Facility Operating License, which requires reporting of violations of the requirements in Section 2, items C(1), C(3) though (33), E, F, K, and L of the Facility Operating License. The proposed amendment would also delete Section 6.6 of the Technical Specifications (TSs) regarding reportable events. Section 6.6 of the TSs are redundant to requirements that have since been embodied in the regulations and, accordingly, may be deleted from the TS.

Virgil C. Summer Nuclear Station

2011-01-01T23:59:59.000Z

47

Facility Operations Office, Brookhaven National Laboratory, BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Operations Office Facility Operations Office Safely supporting the missions of the laboratory... The Facility Operations Office addresses key issues in work planning, maintenance engineering, service-delivery models, and annual facility-work plans. Facility Operations Center: The Facility Operations Center provides computer programs designed to assist in the planning, management and administrative procedures required for an effective maintenance and asset management process. As an information technology tool for managing the maintenance process, a Computerized Maintenance Management System (CMMS) is a mission-essential part of any organization, and a tool for success. Infrastructure Management: IM's goal is to ensure Brookhaven National Laboratory real property assets are planned for, managed, tracked, and upgraded as required in order to meet BNL's current and future programmatic needs. To accomplish this IM performs site and utilities master planning, manages BNL's new project request and prioritization system (3PBP), maintains utilities maps, manages BNL's space and facilities data base, and provides program management for BNL's GPP, Line Item and Operating Funded Project programs.

48

Nuclear Facility Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Operations Facility Operations Nuclear Facility Operations INL is a science-based, applied engineering national laboratory dedicated to meeting the nation's environmental, energy, nuclear technology, and national security needs. INL is a science-based, applied engineering national laboratory dedicated to meeting the nation's environmental, energy, nuclear technology, and national security needs. The Idaho Operations Office oversees these contract activities in accordance with DOE directives. INL is a multi-program laboratory In addition to enabling the Office of Nuclear Energy to develop space power systems and advanced fuel cycle and reactor technologies, INL facilities are used by the National Nuclear Security Administration and other DOE offices, together with other Federal agencies such as the Department of

49

Optimal operating strategy for a storage facility  

E-Print Network (OSTI)

In the thesis, I derive the optimal operating strategy to maximize the value of a storage facility by exploiting the properties in the underlying natural gas spot price. To achieve the objective, I investigate the optimal ...

Zhai, Ning

2008-01-01T23:59:59.000Z

50

Medford Operation Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Medford Operation Biomass Facility Medford Operation Biomass Facility Jump to: navigation, search Name Medford Operation Biomass Facility Facility Medford Operation Sector Biomass Location Jackson County, Oregon Coordinates 42.334535°, -122.7646577° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.334535,"lon":-122.7646577,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

51

Mixed Waste Management Facility (MWMF) groundwater monitoring report. Fourth quarter 1993 and 1993 summary  

Science Conference Proceedings (OSTI)

During fourth quarter 1993, 10 constituents exceeded final Primary Drinking Water Standards in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility, the Old Burial Ground, the E-Area Vaults, and the proposed Hazardous Waste/Mixed Waste Disposal Vaults. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. Carbon tetrachloride, chloroform, chloroethane (vinyl chloride), 1,1-dichloroethylene, dichloromethane (methylene chloride), lead, mercury, or tetrachloroethylene also exceeded standards in one or more wells. Elevated constituents were found in numerous Aquifer Zone 2B{sub 2} (Water Table) and Aquifer Zone 2B{sub 1}, (Barnwell/McBean) wells and in two Aquifer Unit 2A (Congaree) wells. The groundwater flow direction and rates in the three hydrostratigraphic units were similar to those of previous quarters.

Butler, C.T.

1994-03-01T23:59:59.000Z

52

Electric and Hybrid Vehicle Program: Site Operator Program. Quarterly progress report, April--June 1995  

DOE Green Energy (OSTI)

This quarterly report details activities of the Department of Energy (DOE) Site Operator Program for the months of April, May, and June 1995. The 12 program participants, their geographic locations, and the principal thrusts of their efforts are provided.

Kiser, D.M.; Brown, H.L.

1995-09-01T23:59:59.000Z

53

Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities, August 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Report Review Report Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities May 2011 August 2011 Office of Health, Safety and Security Office of Enforcement and Oversight Office of Safety and Emergency Management Evaluations Table of Contents Background ................................................................................................................................................... 1 Results ........................................................................................................................................................... 2 Conduct of the FCA ......................................................................................................................... 2

54

Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities, August 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Report Review Report Facility Centered Assessment of the Los Alamos National Laboratory Science and Technology Operations - Facility Operations Director Managed Facilities May 2011 August 2011 Office of Health, Safety and Security Office of Enforcement and Oversight Office of Safety and Emergency Management Evaluations Table of Contents Background ................................................................................................................................................... 1 Results ........................................................................................................................................................... 2 Conduct of the FCA ......................................................................................................................... 2

55

ARM Climate Research Facility Quarterly Instrument Report Fourth Quarter: October 1December 30, 2010  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

Voyles, JW

2011-01-17T23:59:59.000Z

56

Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations  

SciTech Connect

The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage.

Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

1997-06-01T23:59:59.000Z

57

Geothermal Loop Experimental Facility. Quarterly report, October-December 1978  

DOE Green Energy (OSTI)

The Geothermal Loop Experimental Facility (GLEF) was modified in April 1978 from a four stage flash/binary process to a two stage cycle for the extraction of energy from a high temperature, high salinity, liquid-dominated resource. The overhaul and cleaning during October and pigging problems which led to a limited shutdown in December are discussed. Reservoir assessment, including production and injection wells, are discussed. Results of tests that were accomplished are included. Laboratory data obtained for steam, brine, binary and cooling water, and scale are indicated. Any equipment that required repairs or modifications to equipment and the clarifier/media filter are discussed. The status of the feasibility and surge studies is covered. (MHR)

Anastas, G.; Bischoff, W.S.; Bishop, H.K.

1979-01-01T23:59:59.000Z

58

PFBC HGCU Test facility. Technical progress report, Fourth quarter, CY 1994  

SciTech Connect

During this quarter, the Tidd Hot Gas Clean Up System completed a 691-hour test run which began during the third quarter. Table 1 summarizes all test runs since initial operation. Following this test run the system was shut down and the filter opened for inspection and recandling. The system remained out of service during the remainder of the quarter. In addition to monitoring and evaluating the performance of the HGCU system during testing, engineering effort was devoted to posttest inspection of the APF (Advanced Particle Filter) and evaluation of the effects of totally spoiling the primary cyclone. In addition, the authors worked with Westinghouse in the selection of replacement candles that were installed during the fourth quarter. During the unit outage this quarter, the primary cyclone upstream of the APF was modified to force all of the ash to pass through the cyclone and enter the APF without using spoiling air. Appendices to this report describe the dust shroud support strap design; an analysis of the effect of support-transferred vibrations on the failure of ceramic candle filters; the Tidd APF operation; the Tidd APF boroscope inspection; a general inspection of Tidd filter internals; tally of Tidd filters; ash formations in the W-APF-October 1994 post-test inspection; characterization of the as-manufactured and PFBC-exposed 3M CVI-SiC composite filter matrix; strength characterization of the first and second generation candle filters after 1,705 hours of PFBC operation at Tidd; and filters used in the December 1994 recandling effort at Tidd.

1995-01-01T23:59:59.000Z

59

Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

NONE

1995-10-01T23:59:59.000Z

60

Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993  

SciTech Connect

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

Not Available

1993-10-01T23:59:59.000Z

62

Oak Ridge Reservation Federal Facility Agreement: Quarterly report for the Environmental Restoration Program. Volume 2, January--March 1996  

SciTech Connect

This report provides information about ER Program activities conducted on the Oak Ridge Reservation under the Federal Facility Agreement (FFA). Specifically, it includes information on milestones scheduled for completion during the reporting period as well as scheduled for completion during the next reporting period (quarter), accomplishments of the ER Program, concerns related to program work, and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

1996-04-01T23:59:59.000Z

63

Neutron Science Facilities Operating Status | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Neutron Science Facilities Operating Status High Flux Isotope Reactor The reactor is currently operating at 100% power for fuel cycle 449. Spallation Neutron Source SNS is shutdown...

64

Atmospheric Radiation Measurement Program Climate Research Facility...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report October 1-December 31, 2010 DISCLAIMER This report was prepared as an account of...

65

Atmospheric Radiation Measurement Program Climate Research Facility...  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report April 1-June 30, 2011 DISCLAIMER This report was prepared as an account of work...

66

John C. Barnes of Savannah River Operations named 2012 Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John C. Barnes of Savannah River Operations named 2012 Facility John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department presents the FR of the Year Award to recognize superior service. Mr. John C. Barnes from the Savannah River Operations Office was selected from a field of sixteen nominees as the 2012 DOE FR of the Year. He is responsible for operational oversight of key facilities at the Savannah River Site, including the F and

67

Mixed Waste Management Facility (MWMF) Groundwater Monitoring Report: Fourth quarter 1991 and 1991 summary  

SciTech Connect

During fourth quarter 1991, tritium, trichloroethylene, tetrachloroethylene, chloroethene (vinyl chloride), total radium, mercury, and lead exceeded the US Environmental Protection Agency primary drinking water standards (PDWS) in groundwater samples from monitoring wells at the Mixed Waste Management Facility (MWMF) and adjacent facilities. Tritium and trichloroethylene were the most widespread contaminants; 55 (49%) wells exhibited elevated tritium activities, and 24 (21%) wells exhibited elevated trichloroethylene concentrations. Tritium and trichloroethylene levels exceeding the PDWS also occurred in several wells in Aquifer Unit IIA (Congaree). Levels of manganese, total organic halogens, nickel, iron, 1,1-dichloroethane, aluminum, nonvolatile beta, and trichlorofluoromethane that exceeded Flag 2 criteria were found in one or more wells beneath the MWMF. Downgradient wells in the three hydrostratigraphic units at the MWMF contained elevated levels of tritium, trichloroethylene, tetrachloroethylene, total radium, chloroethene (vinyl chloride), lead, mercury, manganese, total organic halogens, nickel, iron, 1,1-dichloroethane, aluminum, nonvolatile beta, or trichlorofluoromethane. Groundwater samples from 81 (72%) of the monitoring wells at the MWMF and adjacent facilities contained elevated levels of several contaminants.

Thompson, C.Y.

1992-03-01T23:59:59.000Z

68

200 Area treated effluent disposal facility operational test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These completed operational testing activities demonstrated the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-03-01T23:59:59.000Z

69

DOE KSU EV Site Operator Program. Year 1, fourth quarter report, April 1--June 30, 1992  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter`s report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-08-01T23:59:59.000Z

70

Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

Not Available

1994-04-01T23:59:59.000Z

71

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, October--December 1995 (first quarter of fiscal year 1996)  

DOE Green Energy (OSTI)

This is the Site Operator Program quarterly report for USDOE electric and hybrid vehicle research. Its mission now includes the three major activity categories of advancement of electric vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use and increasing public awareness and acceptance of EVs. The 11 Site Operator Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of the site operators totals about 250 vehicles. The individual fleets are summarized.

Francfort, J.E. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1996-03-01T23:59:59.000Z

72

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment Feature Stories Public Reading Room: Environmental Documents, Reports LANL Home Phonebook Calendar Video About Operational Excellence Facilities Facilities...

73

High level waste facilities -- Continuing operation or orderly shutdown  

SciTech Connect

Two options for Environmental Impact Statement No action alternatives describe operation of the radioactive liquid waste facilities at the Idaho Chemical Processing Plant at the Idaho National Engineering and Environmental Laboratory. The first alternative describes continued operation of all facilities as planned and budgeted through 2020. Institutional control for 100 years would follow shutdown of operational facilities. Alternatively, the facilities would be shut down in an orderly fashion without completing planned activities. The facilities and associated operations are described. Remaining sodium bearing liquid waste will be converted to solid calcine in the New Waste Calcining Facility (NWCF) or will be left in the waste tanks. The calcine solids will be stored in the existing Calcine Solids Storage Facilities (CSSF). Regulatory and cost impacts are discussed.

Decker, L.A.

1998-04-01T23:59:59.000Z

74

O&M First! Facility Metering for Improved Operations, Maintenance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Sheet Facility Metering for Improved Operations, Maintenance, and Efficiency Metering and sub-metering of energy and resource use is a critical component of a comprehensive...

75

DOE Office of Science Computing Facility Operational Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment (OA) Review of the efficiencies in the steady-state operations of each of the DOE Office of Science High Performance Computing (HPC) Facilities. * OMB requirement for...

76

CRAD, Training - Y-12 Enriched Uranium Operations Oxide Conversion Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 Enriched Uranium Operations Oxide Conversion Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Training - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January 2005 assessment of the Training Program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Training - Y-12 Enriched Uranium Operations Oxide Conversion Facility More Documents & Publications CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide

77

Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995  

Science Conference Proceedings (OSTI)

This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

NONE

1996-01-01T23:59:59.000Z

78

December 12, 2003: Operations begin at Glovebox Excavator Method facility |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2003: Operations begin at Glovebox Excavator Method 12, 2003: Operations begin at Glovebox Excavator Method facility December 12, 2003: Operations begin at Glovebox Excavator Method facility December 12, 2003: Operations begin at Glovebox Excavator Method facility December 12, 2003 The Department's Idaho National Engineering and Environmental Laboratory (INEEL) begins operations at the Glovebox Excavator Method (GEM) facility. The GEM project will demonstrate buried waste retrieval at Pit 9, which contains mixed transuranic waste generated by the Rocky Flats Plant and shipped to INEEL in the late 1960s. At the GEM facility, workers do not come into direct contact with the waste. Workers operate a backhoe with the arm and scoop bucket extended and isolated inside an enclosed excavation area. The contaminated soil and debris will be processed through a

79

Hot gas cleanup test facility for gasification and pressurized combustion. Quarterly technical progress report, April 1--June 30, 1992  

SciTech Connect

This quarterly technical progress report summarizes work completed during the Seventh Quarter of the First Budget Period, April 1 through June 30, 1992, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion will include the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source; Hot Gas Cleanup Units to mate to all gas streams. Combustion Gas Turbine; Fuel Cell and associated gas treatment; and Externally Fired Gas Turbine/Water Augmented Gas Turbine. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

Not Available

1992-12-01T23:59:59.000Z

80

New Groundwater Treatment Facility Begins Operation: Boost in Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Groundwater Treatment Facility Begins Operation: Boost in New Groundwater Treatment Facility Begins Operation: Boost in Cleanup Accelerated by Recovery Act Funding New Groundwater Treatment Facility Begins Operation: Boost in Cleanup Accelerated by Recovery Act Funding January 19, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL (509)376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) is boosting its capacity for treating groundwater to remove chromium near the Columbia River by 40 percent with the recent completion of a new treatment facility. Contractor CH2M HILL Plateau Remediation Company (CH2M HILL) finished building and started operating the new 100-DX groundwater treatment facility in December. The facility is located near the D and DR Reactors on

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

ARM Climate Research Facility Radar Operations Plan  

SciTech Connect

Roles, responsibilities, and processes associated with Atmospheric Radiation Measurement (ARM) Radar Operations.

Voyles, JW

2012-05-18T23:59:59.000Z

82

Power systems development facility. Quarterly technical progress report, July 1, 1994--September 30, 1994  

Science Conference Proceedings (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

NONE

1995-07-01T23:59:59.000Z

83

Improved Saltstone Facilities Restart Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improved Saltstone Facilities Restart Operations Improved Saltstone Facilities Restart Operations Improved Saltstone Facilities Restart Operations September 1, 2012 - 12:00pm Addthis Savannah River Remediation employees install new equipment in the Saltstone Process Room during the recent outage. Savannah River Remediation employees install new equipment in the Saltstone Process Room during the recent outage. AIKEN, S.C. - The Saltstone Facilities at the Savannah River Site (SRS) have restarted operations following a nine-month planned improvement outage. Improvements to the facilities are expected to provide a new and more reliable system to process larger amounts of decontaminated salt solution needed for future tank closure operations. Saltstone processs and disposes of decontaminated salt solution, reducing the risk of potential

84

Category:Testing Facility Operators | Open Energy Information  

Open Energy Info (EERE)

Facility Operators Facility Operators Jump to: navigation, search This category contains facilities for research on renewable technologies and uses the form Testing Facility Operator. Pages in category "Testing Facility Operators" The following 26 pages are in this category, out of 26 total. A Alden Research Laboratory, Inc B Bucknell University C Colorado State University Hydrodynamics Cornell University Hydrodynamics M Massachusetts Institute of Technology Hydrodynamics O Ohmsett Oregon State University Hydrodynamics P Pennsylvania State University Hydrodynamics S Sandia National Laboratories Hydrodynamics S cont. Stevens Institute of Technology T Texas A&M (Haynes) Texas A&M (OTRC) U United States Army Corp of Engineers (ERDC) United States Geological Survey, HIF United States Geological Survey, LSC

85

Nuclear Facility Operations | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Operations Office oversees these contract activities in accordance with DOE directives. INL is a multi-program laboratory In addition to enabling the Office of Nuclear...

86

Electric and hybrid vehicle program: Site operator program. Quarterly progress report, April--June, 1994 (3rd quarter of FY-1994)  

Science Conference Proceedings (OSTI)

The DOE Site Operator Program was initially established to meet the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. The Program has since evolved in response to new legislation and interests. Its mission now includes three major activity categories; advancement of Electric Vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use, and increasing public awareness and acceptance of EVs. The 13 Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of each participant are summarized. This third quarter report (FY-94) will include a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now included.

Kiser, D.M.; Brown, H.L.

1994-10-01T23:59:59.000Z

87

Energy Facility Evaluation, Siting, Construction and Operation (New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Facility Evaluation, Siting, Construction and Operation (New Energy Facility Evaluation, Siting, Construction and Operation (New Hampshire) Energy Facility Evaluation, Siting, Construction and Operation (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Retail Supplier Rural Electric Cooperative Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State New Hampshire Program Type Siting and Permitting Provider NH Department of Environmental Services, Public Information and Permitting Unit The statute establishes a procedure for the review, approval, monitoring,

88

Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995  

Science Conference Proceedings (OSTI)

This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

NONE

1995-07-01T23:59:59.000Z

89

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report for July through September 1994 (Fourth quarter of fiscal year 1994)  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the US. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: advancement of electric vehicle technologies; development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. The ultimate thrust of program activities varies among sites, reflecting not only the Operator`s business interests but also geographic and climate-related operating conditions. This fourth quarter report (FY-94) includes a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now found in Appendix A.

Kiser, D.M.; Brown, H.L.

1995-03-01T23:59:59.000Z

90

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-01-12T23:59:59.000Z

91

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-02-02T23:59:59.000Z

92

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES  

E-Print Network (OSTI)

MANAGEMENT, OPERATION, AND MAINTENANCE SYSTEMS FOR WASTE FACILITIES DONALD H. GRAHAM Operations. The discussion will focus on the management, operation, and maintenance systems nec essary to support long maintenance management pro gram (j) cost accounting and a record keeping system to provide timely, accurate

Columbia University

93

Spent nuclear fuel project cold vacuum drying facility operations manual  

SciTech Connect

This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

IRWIN, J.J.

1999-05-12T23:59:59.000Z

94

ARM Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 1September 30, 2012  

SciTech Connect

The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive.

Sivaraman, C

2012-11-13T23:59:59.000Z

95

ARM Climate Research Facility Quarterly Value-Added Product Report First Quarter: October 01-December 31, 2011  

SciTech Connect

The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive.

Sivaraman, C

2012-02-28T23:59:59.000Z

96

Electric and Hybrid Vehicle Program; Site Operator Program. Quarterly progress report, October--December 1991  

DOE Green Energy (OSTI)

Activities during the first quarter centered around integrating the new participants into the program. A meeting of the Site Operators, in conjunction with the first meeting of the Electric Vehicle Users Task Force, was held in October. A second meeting of the Task Force was held in December. During these meetings the new contractual requirements were explained to the participants. The Site Operator Data Base was distributed and explained. The Site Operators will begin using the data base in December 1991 and will supply the operating and maintenance data to the INEL on a monthly basis. The Operators requested that they be able to have access to the data of the other Operators and it was agreed that they would be provided this on floppy disk monthly from the INEL. Presentations were made to the DOE sponsored Automotive Technology Development-Contractors Coordination Meeting in October. An overview of the program was given by EG&G. Representatives from Arizona Public Service, Texas A&M University, and York Technical College provided details of their programs and the results and future goals. Work was begun on commercializing the Versatile Data Acquisition System (VDAS). A Scope of Work has been written for a Cooperative Research and Development Agreement (CRADA) to be submitted to the USABC. If implemented, the CRADA will provide funds for the development and commercialization of the VDAS. Participants in the Site Operator Program will test prototypes of the system within their fleets, making the data available to the USABC and other interested organizations. The USABC will provide recommendations on the data to be collected. Major activities by the majority of the Operators were involved with the continued operation and demonstration of existing vehicles. In addition, several of the operators were involved in identifying and locating vehicles to be added to their fleets. A list of the vehicles in each Site Operator fleet is included as Appendix A to this report.

Warren, J.F.

1992-01-01T23:59:59.000Z

97

ARM Climate Research Facility Quarterly Value-Added Product Report Fourth Quarter: July 01September 30, 2011  

SciTech Connect

The purpose of this report is to provide a concise status update for value-added products (VAP) implemented by the Atmospheric Radiation Measurement Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun, (2) progress on existing VAPs, (3) future VAPs that have been recently approved, (4) other work that leads to a VAP, and (5) top requested VAPs from the archive. New information is highlighted in blue text. New information about processed data by the developer is highlighted in red text.

Sivaraman, C

2011-11-02T23:59:59.000Z

98

EMSL Quarterly Highlights Report 2nd Quarter FY08  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Highlights Report: 2 Quarterly Highlights Report: 2 nd Quarter, FY08 1 The W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Users are participants on accepted proposals. Staff members work with users to expedite access. The EMSL Quarterly Highlights Report documents research and activities of EMSL staff and users. Research Highlights Atmospheric Aerosol Chemistry

99

A probabilistic risk assessment of the LLNL Plutonium facility`s evaluation basis fire operational accident  

Science Conference Proceedings (OSTI)

The Lawrence Livermore National Laboratory (LLNL) Plutonium Facility conducts numerous involving plutonium to include device fabrication, development of fabrication techniques, metallurgy research, and laser isotope separation. A Safety Analysis Report (SAR) for the building 332 Plutonium Facility was completed rational safety and acceptable risk to employees, the public, government property, and the environment. This paper outlines the PRA analysis of the Evaluation Basis Fire (EDF) operational accident. The EBF postulates the worst-case programmatic impact event for the Plutonium Facility.

Brumburgh, G.

1994-08-31T23:59:59.000Z

100

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data validation report for the 100-HR-3 Operable Unit first quarter 1994 groundwater sampling data  

Science Conference Proceedings (OSTI)

Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-HR-3 Operable Unit First Quarter 1994 Groundwater Sampling Investigation. Therefore, the data from the chemical analysis of twenty-four samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The samples were analyzed by Thermo-Analytic Laboratories (TMA) and Roy F. Weston Laboratories (WESTON) using US Environmental Protection Agency (EPA) CLP protocols. Sample analyses included: inorganics; and general chemical parameters. Forty-two samples were validated for radiochemical parameters by TMA and Teledyne.

Biggerstaff, R.L.

1994-06-24T23:59:59.000Z

102

Operations aspects of the Fermilab Central Helium Liquefier Facility  

SciTech Connect

The Fermilab Central Helium Liquefier (CHL) facility consists of helium and nitrogen reliquefier plants operated 24 hours-a-day to supply LHe at 4.6{degrees}K and LN{sub 2} for the Fermilab Tevatron superconducting proton-antiproton collider ring and to recover warm return gases. Operating aspects of CHL, including different equipment and systems reliability, availability, maintenance experience, safety concerns, and economics aspects are discussed.

Geynisman, M.G.; Makara, J.N.

1995-03-01T23:59:59.000Z

103

Operations aspects of the Fermilab Central Helium Liquefier facility  

SciTech Connect

The Fermilab Central Helium Liquefier (CHL) facility consists of helium and nitrogen reliquefier plants operated 24 hours-a-day to supply LHe at 4.6 K and LN{sub 2} for the Fermilab Tevatron superconducting proton-antiproton collider ring and to recover warm return gases. Operating aspects of CHL, including different equipment and systems reliability, availability, maintenance experience, safety concerns, and economics aspects are discussed.

Geynisman, M.G.; Makara, J.N.

1996-09-01T23:59:59.000Z

104

The Defense Waste Processing Facility: Two Years of Radioactive Operation  

Science Conference Proceedings (OSTI)

The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

Marra, S.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Gee, J.T.; Sproull, J.F.

1998-05-01T23:59:59.000Z

105

Operational Issues at the Environmental Restoration Disposal Facility at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Hanford Operations Evaluating Operational Issues at the Environmental Restoration Disposal Facility at Hanford By Craig H. Benson, PhD, PE; William H. Albright, PhD; and David P. Ray, PE Sponsored by: The Office of Engineering and Technology (EM-20) 17 June 2007 i TABLE OF CONTENTS EXECUTIVE SUMMARY ii ACKNOWLEDGEMENTS iv INTRODUCTION 1 BACKGROUND 1 Environmental Restoration Disposal Facility 1 Source of Concern 2 LINES OF INQUIRY 2 1. Validate Scope of Identified Problems 2 2. Assess Contractor Evaluation of the Elevated Leachate Level on the Landfill Liner 3 3. Evaluate Adequacy of Landfill Performance in View of the Discovered Falsified Compaction Data and Potential Leachate Level Problems 4

106

Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

Rowan, Gerald D.

1997-06-01T23:59:59.000Z

107

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

108

Design and operation of an outdoor microalgae test facility  

DOE Green Energy (OSTI)

The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting cost objectives.

Weissman, J.C.; Tillett, D.M.; Goebel, R.P. (Microbial Products, Inc., Vacaville, CA (USA))

1989-10-01T23:59:59.000Z

109

Electric and hybrid vehicle program; Site Operator Program. Quarterly progress report, January--March 1992 (Second quarter of fiscal year 1992)  

DOE Green Energy (OSTI)

Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

Warren, J.F.

1992-05-01T23:59:59.000Z

110

Quarterly update. [Oil supply and demand data for the Organization for Economic Co-operation and Development  

SciTech Connect

This quarterly report presents detailed statistics on oil supply and demand in the countries of the Organization for Economic Co-operation and Development. The information consists of complete balances of production, trade, refinery intake/output, final consumption, stock levels, and changes for crude oil, natural gas liquids, refinery feedstocks, and 9 product groups; separate trade data for main product groups, LPG, and naphtha; imports for 48 origins; exports for 31 destinations; international marine bunkers and deliveries by product group; aggregates of quarterly data to annual totals; and natural gas supply and consumption. The information supplied is for Belgium, Denmark, France, Germany, Ireland, Italy, Luxembourg, the Netherlands, UK, European Economic Community, Austria, Finland, Greece, Iceland, Norway, Portugal, Spain, Sweden, Switzerland, Turkey, OECD Europe, Australia, Canada, Japan, New Zealand, and the US.

1980-01-01T23:59:59.000Z

111

The insertion device magnetic measurement facility: Prototype and operational procedures  

SciTech Connect

This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications.

Burkel, L.; Dejus, R.; Maines, J.; O' Brien, J.; Vasserman, I. (Argonne National Lab., IL (United States). Advanced Photon Source Accelerator Systems Div.); Pfleuger, J. (Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany). Hamburger Synchrotronstrahlungslabor)

1993-03-01T23:59:59.000Z

112

Electric and hybrid vehicle program site operator program. Quarterly progress report, October 1994--December 1994 (First quarter of FY-95)  

DOE Green Energy (OSTI)

The DOE Site Operator Program was initially established to meet the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. The Program has since evolved in response to new legislation and interests. Its mission now includes three ma or activity categories: (1) Advancement of Electric Vehicle (EV) technologies, (2) Development of infrastructure elements needed to support significant EV use, and (3) Increasing public awareness and acceptance of EVs. The 13 Program participants, their geographic locations, and the principal thrusts of their efforts are identified in Table ES-1. The EV inventories of each participant are summarized in Table ES-2.

Kiser, D.M.; Brown, H.L.

1995-07-01T23:59:59.000Z

113

Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standard Review Plan Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Preparation for Facility Operations Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 Table of Contents Objective ......................................................................................................................................... 4 Requirements .................................................................................................................................. 4 Primary References ......................................................................................................................... 6

114

NREL's Research Support Facility: An Operations Update - December 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL's Research Support Facility: NREL's Research Support Facility: An Energy Performance Update Shanti Pless- Senior Research Engineer Chad Lobato - Research Engineer Joe Drexler - Chief Engineer for Site Operations and Maintenance Paul Torcellini - Group Manager Ron Judkoff - Principal Program Manager Commercial Buildings Research Group December 2011 Innovation for Our Energy Future Innovation for Our Energy Future 0 20 40 60 80 100 120 140 Old NREL/DOE Leased Office Space Typical Denver Office Building ENERGY STAR 75 Office Building Average LEED Office Building ENERGY STAR 90 Office Building EPA Region 8 Office Denver, CO RSF RSF Renewable Production Annual EUI (kBtu/ft 2 ) Site Mounted PV Roof Mounted PV Data Center Whole Building Energy Efficiency Design Requirements

115

Report of the Task Group on operation Department of Energy tritium facilities  

SciTech Connect

This report discusses the following topics on the operation of DOE Tritium facilities: Environment, Safety, and Health Aspects of Tritium; Management of Operations and Maintenance Functions; Safe Shutdown of Tritium Facilities; Management of the Facility Safety Envelope; Maintenance of Qualified Tritium Handling Personnel; DOE Tritium Management Strategy; Radiological Control Philosophy; Implementation of DOE Requirements; Management of Tritium Residues; Inconsistent Application of Requirements for Measurement of Tritium Effluents; Interdependence of Tritium Facilities; Technical Communication among Facilities; Incorporation of Confinement Technologies into New Facilities; Operation/Management Requirements for New Tritium Facilities; and Safety Management Issues at Department of Energy Tritium Facilities.

1991-10-01T23:59:59.000Z

116

OPS 9.13 Operations Aspects of Facility Chemistry and Unique...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS 9.13 Operations Aspects of Facility Chemistry and Unique Processes 82498 OPS 9.13 Operations Aspects of Facility Chemistry and Unique Processes 82498 The objective of this...

117

Article on Trident Laser Facility for NA-11 Stockpile Stewardship Quarterly  

Science Conference Proceedings (OSTI)

The Trident Intermediate-Scale Laser Facility at Los Alamos National Laboratory is an extremely versatile Nd:glass laser system dedicated to high energy density laboratory physics and weapons physics research and fundamental laser-matter interactions. Trident is a three-beam, 200 J/beam at the second harmonic for glass (527 nm wavelength), facility with tremendous flexibility and high beam quality. Pulse durations varying over 6 orders of magnitude, from 0.5 picoseconds to 1.0 microsecs, can be directed to either of two different target chambers with changeable illumination geometries, including the ability to achieve near-diffraction limited focus. This provides a unique range of capability at one facility from sub-picosecond pulses (and high-intensity laser science) to nanosecond pulses (and LPI physics relevant to ICF) to microsecond pulses (and driving flyer plates for supported shock dynamic materials science.) When in short-pulse mode (less than picosecond pulse), a single beam can provide up to 200 TW of power with uniquely controllable and measured pre-pulse contrast of 10 orders of magnitude. A recent external capability review at Los Alamos concluded that 'Trident is generating excellent, cutting edge science and is a leading intermediate scale laser system worldwide.'

Barnes, Cris W. [Los Alamos National Laboratory

2012-08-13T23:59:59.000Z

118

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

DOE Green Energy (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

119

Geothermal Loop Experimental Facility. Quarterly report, July-September, 1978 and annual report, October 1, 1977-September 30, 1978  

DOE Green Energy (OSTI)

Information obtained on the operation of the plant, components, brine and steam composition, production and injection wells, and the potential of the Niland Reservoir are reviewed. The Geothermal Loop Experimental Facility (GLEF) was modified from a four stage flash/binary process to a two stage flash process with two parallel flash trains for the extraction of energy from a high temperature, high salinity, liquid-dominated resource. The general operation and accomplishments of the GLEF during the period from October 1977 through September 1978 are summarized and these activities during the period from July 1978 through September 1978 are detailed. The four stage flash/binary process test results were used in a Feasibility and Risk Study which identified the two stage flash cycle as the preferred cycle. The facility was modified to test critical portions of the cycle and testing was initiated.

Bischoff, W.S.; Haas, C.H.; Hoaglin, G.J.; Jacobson, W.O.; Mulliner, D.K.; Newell, D.G.; Swanson, C.R.

1978-10-01T23:59:59.000Z

120

Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.  

Science Conference Proceedings (OSTI)

The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

Rowan, Gerald D.

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

M-Area Hazardous Waste Management Facility. Fourth Quarter 1994, Groundwater Monitoring Report  

SciTech Connect

The unlined settling basin operated from 1958 until 1985, receiving waste water that contained volatile organic solvents used for metal degreasing and chemical constituents and depleted uranium from fuel fabrication process in M Area. The underground process sewer line transported M-Area process waste waters to the basin. Water periodically overflowed from the basin through the ditch to the seepage area adjacent to the ditch and to Lost Lake.

Chase, J.A.

1995-04-20T23:59:59.000Z

122

Transuranic (Tru) waste volume reduction operations at a plutonium facility  

SciTech Connect

Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National Laboratory Continuous Improvement Program by improving the efficiency, cost-effectiveness, and formality of glovebox operations. In this report, the technical issues, associated with implementing this process improvement are addressed, the results discussed, effectiveness of Lessons Learned evaluated, and waste savings presented.

Cournoyer, Michael E [Los Alamos National Laboratory; Nixon, Archie E [Los Alamos National Laboratory; Dodge, Robert L [Los Alamos National Laboratory; Fife, Keith W [Los Alamos National Laboratory; Sandoval, Arnold M [Los Alamos National Laboratory; Garcia, Vincent E [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

123

Transuranic (Tru) waste volume reduction operations at a plutonium facility  

SciTech Connect

Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National Laboratory Continuous Improvement Program by improving the efficiency, cost-effectiveness, and formality of glovebox operations. In this report, the technical issues, associated with implementing this process improvement are addressed, the results discussed, effectiveness of Lessons Learned evaluated, and waste savings presented.

Cournoyer, Michael E [Los Alamos National Laboratory; Nixon, Archie E [Los Alamos National Laboratory; Dodge, Robert L [Los Alamos National Laboratory; Fife, Keith W [Los Alamos National Laboratory; Sandoval, Arnold M [Los Alamos National Laboratory; Garcia, Vincent E [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

124

WIPP Remote Handled Waste Facility: Performance Dry Run Operations  

SciTech Connect

The Remote Handled (RH) TRU Waste Handling Facility at the Waste Isolation Pilot Plant (WIPP) was recently upgraded and modified in preparation for handling and disposal of RH Transuranic (TRU) waste. This modification will allow processing of RH-TRU waste arriving at the WIPP site in two different types of shielded road casks, the RH-TRU 72B and the CNS 10-160B. Washington TRU Solutions (WTS), the WIPP Management and Operation Contractor (MOC), conducted a performance dry run (PDR), beginning August 19, 2002 and successfully completed it on August 24, 2002. The PDR demonstrated that the RHTRU waste handling system works as designed and demonstrated the handling process for each cask, including underground disposal. The purpose of the PDR was to develop and implement a plan that would define in general terms how the WIPP RH-TRU waste handling process would be conducted and evaluated. The PDR demonstrated WIPP operations and support activities required to dispose of RH-TRU waste in the WIPP underground.

Burrington, T. P.; Britain, R. M.; Cassingham, S. T.

2003-02-24T23:59:59.000Z

125

SOP Quarterly Report FY-94 3rd Quarter  

NLE Websites -- All DOE Office Websites (Extended Search)

Hybrid Vehicle Program Site Operator Program Quarterly Progress Report for April thru June 1994 (3rd Quarter of FY-1994) INEL-940072-Qtr 3 Formerly: EGG-EP-11237-Qtr 3 D. M. Kiser...

126

Headquarters Security Operations Facility Clearance and Approval Program  

Energy.gov (U.S. Department of Energy (DOE))

The Headquarters Facility Clearance and Approval Program (FCAP) is established by DOE Order to administratively determine that a facility is or is not eligible to access, receive, produce, use, and...

127

Surveillance Guide - OPS 9.13 Operations Aspects of Facility Chemistry and Unique Processes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONS ASPECTS OF FACILITY CHEMISTRY AND UNIQUE PROCESSES OPERATIONS ASPECTS OF FACILITY CHEMISTRY AND UNIQUE PROCESSES 1.0 Objective The objective of this surveillance is to ensure that the contractor has provided for an effective interface between facility operations personnel and personnel responsible for operation of individual processes. The Facility Representative interviews facility and process operations personnel, observes ongoing work activities including shift rounds, and evaluates procedures and training for responding to off-normal or emergency conditions. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 2.2 DOE-STD-1032-93, Guide to Good Practices for Operations Aspects of Unique Processes 3.0 Requirements Implemented

128

EIS-0388: Operation of a Biosafety Level 3 Facility at the Los Alamos  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

88: Operation of a Biosafety Level 3 Facility at the Los 88: Operation of a Biosafety Level 3 Facility at the Los Alamos National Laboratory, New Mexico EIS-0388: Operation of a Biosafety Level 3 Facility at the Los Alamos National Laboratory, New Mexico Summary This EIS evaluates the operation of a Biosafety Level 3 Facility (BSL-3 Facility) at the Los Alamos National Laboratory (LANL). A BSL-2 Alternative, an existing BSL-2 permitted facility, and a No Action Alternative will be analyzed. The EIS is currently on hold. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 30, 2005 EIS-0388: Extension of Scoping Period for the Notice of Intent to Prepare an Environmental Impact Statement Operation of a Biosafety Level 3 Facility at Los Alamos National

129

Operator awareness of system status during Fast Flux Test Facility transition to standby  

Science Conference Proceedings (OSTI)

A facility in transition, due to a change in its mission or its operating status, begins to depart from a previously well-defined normal mode of operation. The equipment becomes reconfigured or deactivated. In an environment of transition, the Fast Flux Test Facility (FFTF) has employed methods to enhance operator awareness of system status. These methods are described in this report.

Gibson, J.L.

1994-04-01T23:59:59.000Z

130

U.S. Department of Energy Oak Ridge Operations Nuclear Facility Safety  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Oak Ridge Operations Nuclear Facility U.S. Department of Energy Oak Ridge Operations Nuclear Facility Safety Basis Fundamentals, Self-Study Guide U.S. Department of Energy Oak Ridge Operations Nuclear Facility Safety Basis Fundamentals, Self-Study Guide This is an open-book evaluation. Complete the questions, and submit your answers (hand-written or electronically) to the Training Center. Someone will check and grade your answers. If you achieve a score of at least 80%, you will receive a completion certificate. Nuclear Facility Safety Basis Fundamentals Self-Study Guide Review Questions More Documents & Publications Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility

131

EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Facility Operations at the U.S. DOE Grand Junction 30: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD June 8, 1996 EA-0930: Finding of No Significant Impact Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand

132

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwate Monitoring and Corrective-Action Report, First and Second Quarters 1998, Volumes I, II, & III  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah river Site (SRS) during first and second quarters 1998. This program is required by South Carolina Hazardous Waste Permit SC1-890-008-989 and Section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. Report requirements are described in the 1995 RCRA Renewal Permit, effective October 5, 1995, Section IIIB.H.11.b for the M-Area HWMF and Section IIIG.H.11.b for the Met Lab HWMF.

Chase, J.

1998-10-30T23:59:59.000Z

133

Facility Operations and User Support | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Above image: Red Storm supercomputer at Sandia National LaboratoriesNew Mexico. (Sandia National Laboratories) This sub-program provides both necessary physical facility and...

134

Standard Review Plan Preparation for Facility Operations Strengthening...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Preparation...

135

TYPE OF OPERATION R Research & Development T& Facility Type  

Office of Legacy Management (LM)

-- R Research & Development T& Facility Type 0 Production scale testing a Pilat scale Y-. Bench Scale Process i Theoretical Studies Sample & Analysis 0 Productian 0 Disposal...

136

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEPTEMBER 1998 1 SEPTEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT DOE NEPA Community to Meet in October For Third Quarter FY 1998 September 1, 1998, Issue No. 16 On October 14 and 15, 1998, the DOE NEPA Community will meet in North Las Vegas, hosted by the Nevada Operations Office at its new Support Facility. The Office of NEPA Policy and Assistance is sponsoring this meeting to improve DOE NEPA performance through sharing of lessons learned and discussion of current issues. Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process The meeting will focus on issues that NEPA Document Managers face daily: What tools and techniques can help

137

High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility  

SciTech Connect

Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where appropriate, changes in Center metrics were introduced. This report covers CY 2010 and CY 2011 Year to Date (YTD) that unless otherwise specified, denotes January 1, 2011 through June 30, 2011. User Support remains an important element of the OLCF operations, with the philosophy 'whatever it takes' to enable successful research. Impact of this center-wide activity is reflected by the user survey results that show users are 'very satisfied.' The OLCF continues to aggressively pursue outreach and training activities to promote awareness - and effective use - of U.S. leadership-class resources (Reference Section 2). The OLCF continues to meet and in many cases exceed DOE metrics for capability usage (35% target in CY 2010, delivered 39%; 40% target in CY 2011, 54% January 1, 2011 through June 30, 2011). The Schedule Availability (SA) and Overall Availability (OA) for Jaguar were exceeded in CY2010. Given the solution to the VRM problem the SA and OA for Jaguar in CY 2011 are expected to exceed the target metrics of 95% and 90%, respectively (Reference Section 3). Numerous and wide-ranging research accomplishments, scientific support, and technological innovations are more fully described in Sections 4 and 6 and reflect OLCF leadership in enabling high-impact science solutions and vision in creating an exascale-ready center. Financial Management (Section 5) and Risk Management (Section 7) are carried out using best practices approved of by DOE. The OLCF has a valid cyber security plan and Authority to Operate (Section 8). The proposed metrics for 2012 are reflected in Section 9.

Baker, Ann E [ORNL; Bland, Arthur S Buddy [ORNL; Hack, James J [ORNL; Barker, Ashley D [ORNL; Boudwin, Kathlyn J. [ORNL; Kendall, Ricky A [ORNL; Messer, Bronson [ORNL; Rogers, James H [ORNL; Shipman, Galen M [ORNL; Wells, Jack C [ORNL; White, Julia C [ORNL

2011-08-01T23:59:59.000Z

138

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support LANL's security mission DARHT accelerator DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is

139

CFN Operations and Safety Awareness (COSA) Checklist Proximal Probes Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Proximal Probes Facility Proximal Probes Facility Building 735 This COSA form must be completed for all experimenters working in the CFN and must be submitted to the CFN User Office for badge access. CFN Safety Awareness Policy: Each user must be instructed in the safe procedures in CFN related activities. CFN Facility Laboratory personnel shall keep readily available all relevant instructions and safety literature. Employee/Guest Name Life/Guest Number Department/Division ES&H Coordinator/Ext. Facility Manager COSA Trainer Guest User Staff USER ADMINISTRATION Checked in at User Administration and has valid BNL ID badge Safety Approval Form (SAF) approved. Training requirements completed (Indicate additional training specified in SAF or ESR in lines provided below): Select ESRs

140

CFN Operations and Safety Awareness (COSA) Checklist Electronic Nanomaterials Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Nanomaterials Facility Electronic Nanomaterials Facility Building 735 This COSA form must be completed for all experimenters working in the CFN and must be submitted to the CFN User Office for badge access. CFN Safety Awareness Policy: Each user must be instructed in the safe procedures in CFN related activities. CFN Facility Laboratory personnel shall keep readily available all relevant instructions and safety literature. Employee/Guest Name Life/Guest Number Department/Division ES&H Coordinator/Ext. Facility Manager COSA Trainer Guest User Staff USER ADMINISTRATION Checked in at User Administration and has valid BNL ID badge Safety Approval Form (SAF) approved. Training requirements completed (Indicate additional training specified in SAF or ESR in lines provided below):

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

The Joint Agricultural Weather Facility's Operational Assessment Program  

Science Conference Proceedings (OSTI)

The Joint Agricultural Weather Facility (JAWF), a cooperative effort between the Climate Analysis Center, NMC/NWS/NOAA (National Meteorological Center/National Weather Service/National Oceanic and Atmospheric Administration) and the World ...

Raymond P. Motha; Thomas R. Heddinghaus

1986-09-01T23:59:59.000Z

142

CFN Operations and Safety Awareness (COSA) Checklist Electron Microscopy Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Electron Microscopy Facility Electron Microscopy Facility Building 735 This COSA form must be completed for all experimenters working in the CFN and must be submitted to the CFN User Office for badge access. CFN Safety Awareness Policy: Each user must be instructed in the safe procedures in CFN related activities. CFN Facility Laboratory personnel shall keep readily available all relevant instructions and safety literature. Employee/Guest Name Life/Guest Number Department/Division ES&H Coordinator/Ext. Facility Manager COSA Trainer Guest User Staff USER ADMINISTRATION Checked in at User Administration and has valid BNL ID badge Safety Approval Form (SAF) approved. Training requirements completed (Indicate additional training specified in SAF or ESR in lines provided below):

143

Operating experience review -- Conduct of operations at Department of Energy facilities  

Science Conference Proceedings (OSTI)

This research examined human error related occurrences, reported in the ORPS database, for the purpose of identifying weaknesses in the implementation of the guidance regarding the Conduct of Operations contained in DOE 5480.19. Specifically, this research examined three separate samples of occurrence reports from Defense Program facilities, which cited human error as a direct or contributing cause. These reports were evaluated using a coding scheme which incorporated the guidelines present in 5480.19, as well as a number of generic human factors concerns. The second chapter of this report summarizes the coding scheme which was used to evaluate the occurrence reports. Since the coding scheme is quite lengthy, only the parts of the scheme needed to make the remainder of the report clear are included in this chapter. Details on the development and content of the coding scheme are reported in Appendices A, B, and C. Chapter 3 presents the analysis of three different data sets. This chapter demonstrates that similar results were obtained across different data sets, collected at different points in time, and coded by different raters. The implications of the results obtained in Chapter 3 are discussed in Chapter 4. This chapter makes a number of suggestions for reducing the problems found in the occurrence reports. Chapter 5 applies the methodology that has been developed in this report to two facilities at Los Alamos National Laboratory. Finally, Chapter 6 reiterates the major findings of this report. Several additional analyses appear in appendices at the end of this report.

Not Available

1994-08-01T23:59:59.000Z

144

Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem, Thornhollow and Pendleton satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam and South Fork Walla Walla facilities are used for holding and spawning chinook salmon. In some years, Three Mile Dam may also be used for holding and spawning coho salmon. In the spring of 2002, summer steelhead were acclimated and released at Bonifer Pond (54,917), Minthorn Springs (47,521), and Pendleton (54,366). Yearling coho (1,621,857) were also acclimated and released at Pendleton. Yearling spring chinook salmon (876,121) were acclimated and released at Imeques C-mem-ini-kem. At Thornhollow, 520,564 yearling fall chinook and 307,194 subyearling fall chinook were acclimated. In addition, 104,908 spring chinook were transported to Imeques C-mem-ini-kem in November for release in the spring of 2003. CTUIR and ODFW personnel monitored the progress of outmigration for juvenile releases at the Westland Canal juvenile facility. Nearly all juveniles released in the spring migrated downstream prior to the trap being opened in early July. A total of 100 unmarked and 10 marked summer steelhead were collected for broodstock at Three Mile Dam from September 21, 2001, through April 2, 2002. An estimated 180,955 green eggs were taken from 36 females and were transferred to Umatilla Hatchery for incubation and rearing. A total of 560 adult and 26 jack spring chinook salmon were collected for broodstock at Three Mile Dam from April 22 through June 12, 2002, and were transported to South Fork Walla Walla. An estimated 1,017,113 green eggs were taken from 266 females and were transferred to Umatilla Hatchery. Excess unmarked broodstock (seven adult males, five jacks, and 34 females) were released into the South Fork Walla Walla River at the end of spawning. A total of 168 adult and eight jack spring chinook salmon were transferred from Three Mile Dam to South Fork Walla Walla between June 6 and June 23 for temporary holding. On August 8, 154 adults and eight jacks were released into the South Fork Walla Walla River to spawn naturally. A total of 214 adult spring chinook salmon were transferred from Ringold Hatchery to South Fork Walla Walla between June 7 and June 20 for temporary holding. On August 8, 171 were released into natural production areas in the Walla Walla River basin to spawn naturally. A total of 525 adult and 34 jack fall chinook salmon were collected and held for broodstock at Three Mile Dam from September 16 to November 17, 2002. An estimated 678,122 green eggs were taken from 183 females. The eggs were transferred to Umatilla Hatchery. Coho salmon broodstock were not collected in 2002. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and spring and fall chinook salmon broodstock for monitoring and evaluation purposes. Infectious hematopoietic necrosis virus (IHNV) was detected in five of 68 spawned summer steelhead. Summer steelhead were not examined for bacterial kidney disease (Renibacterium salmoninarum; BKD) in 2002. Infectious hematopoietic necrosis virus was detected in 27 of 78 spawned spring chinook females. Two hundred sixty-six spawned spring chinook females were sampled for BKD and two had low to moderate levels of Rs antigen (ELISA OD{sub 405} readings of 0.260 and 0.365). All others had low to negative levels of Rs antigen (ELISA OD{sub 405} readings of 0.00 to 0.099). Twenty-one spring chinook mortalities were examined for culturable bacteria and enteric redmouth disease

Rowan, Gerald

2003-05-01T23:59:59.000Z

145

EA-1562: Construction and Operation of a Physical Sciences Facility at the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

562: Construction and Operation of a Physical Sciences Facility 562: Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington EA-1562: Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington SUMMARY This EA evaluates the potential environmental impacts of DOE proposed activities associated with constructing and operating a new Physical Sciences Facility (PSF) complex on DOE property located in Benton County, north of Richland, Washington. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD June 14, 2013 EA-1562-SA-1: Supplement Analysis Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland,

146

SPEAR 3 Quarterly Report  

NLE Websites -- All DOE Office Websites (Extended Search)

through December through December 2000 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 2. Cost Reporting B. Detailed Reports 1.1 Magnets & Supports 1.2 Vacuum System 1.3 Power Supplies 1.4 RF System 1.5 Instrumentation & Controls 1.6 Cable Plant 1.8 Facilities 2.1 Accelerator Physics 2.2 Environmental Health and Safety A. SPEAR 3 PROJECT SUMMARY 1. Technical Progress Some staff changes have occurred during this quarter as shown in the organization chart (Fig. A1). The Project Management Control System (PMCS) area is now headed by Steve McNiel who replaces Teri Knight. Teri has helped set-up the PMCS operation and reporting system over the last year and we deeply appreciate her efforts. Both Steve and Teri have the experience of utilizing the Primavera/Cobra system for tracking and

147

Battery test facility hardware, software, and system operation  

SciTech Connect

Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers` claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

Rodriguez, G.P.

1991-09-01T23:59:59.000Z

148

Battery test facility hardware, software, and system operation  

SciTech Connect

Division 2525 Battery Test Laboratory is a fully automated battery testing facility used in evaluating various battery technologies. The results of these tests are used to verify developers' claims, characterize prototypes, and assist in identifying the strengths and weaknesses of each technology. The Test Facility consists of a central computer and nine remote computer controlled battery test systems. Data acquired during the battery testing process is sent to the central computer system. The test data is then stored in a large database for future analysis. The central computer system is also used in configuring battery tests. These test configurations are then sent to their appropriate remote battery test sites. The Battery Test Facility can perform a variety of battery tests, which include the following: Life Cycle Testing; Parametric Testing at various temperature levels, cutoff parameters, charge rates, and discharge rates; Constant Power Testing at various power levels; Peak Power Testing at various State-of-Charge levels; Simplified Federal Urban Driving Schedule Tests (SFUDS79). The Battery Test Facility is capable of charging a battery either by constant current, constant voltage, step current levels, or any combination of them. Discharge cycles can be by constant current, constant resistance, constant power, step current levels, or also any combination of them. The Battery Test Facility has been configured to provide the flexibility to evaluate a large variety of battery technologies. These technologies include Lead-Acid, Sodium/Sulfur, Zinc/Bromine, Nickel/Hydrogen, Aluminum/Air, and Nickel/Cadmium batteries.

Rodriguez, G.P.

1991-09-01T23:59:59.000Z

149

Electric and hybrid vehicle program site operator program. Quarterly progress report, January 1995--March 1995  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the United States. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned. The Mission Statement of the Site Operator Program includes three major activities: (1) Advancement of electric vehicle technologies; (2) Development of infrastructure elements necessary to support significant electric vehicle use; and (3) Increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. Table 1 indicates the EVs in each of the Site Operator fleets. Table 2 provides baseline information on several EVs currently in use by the Site Operators, or which have evolved to the point that they may be introduced in the near future. The Program is currently managed by personnel of the Electric and Hybrid Vehicle Program at the Idaho National Engineering Laboratory (INEL). The current principal management functions include: Coordination of Site Operator efforts in the areas of public awareness and infrastructure development (program-related meetings, and educational presentations).

Kiser, D.M.; Brown, H.L.

1995-08-01T23:59:59.000Z

150

High Performance Computing Facility Operational Assessment, FY 2010 Oak Ridge Leadership Computing Facility  

SciTech Connect

Oak Ridge National Laboratory's (ORNL's) Cray XT5 supercomputer, Jaguar, kicked off the era of petascale scientific computing in 2008 with applications that sustained more than a thousand trillion floating point calculations per second - or 1 petaflop. Jaguar continues to grow even more powerful as it helps researchers broaden the boundaries of knowledge in virtually every domain of computational science, including weather and climate, nuclear energy, geosciences, combustion, bioenergy, fusion, and materials science. Their insights promise to broaden our knowledge in areas that are vitally important to the Department of Energy (DOE) and the nation as a whole, particularly energy assurance and climate change. The science of the 21st century, however, will demand further revolutions in computing, supercomputers capable of a million trillion calculations a second - 1 exaflop - and beyond. These systems will allow investigators to continue attacking global challenges through modeling and simulation and to unravel longstanding scientific questions. Creating such systems will also require new approaches to daunting challenges. High-performance systems of the future will need to be codesigned for scientific and engineering applications with best-in-class communications networks and data-management infrastructures and teams of skilled researchers able to take full advantage of these new resources. The Oak Ridge Leadership Computing Facility (OLCF) provides the nation's most powerful open resource for capability computing, with a sustainable path that will maintain and extend national leadership for DOE's Office of Science (SC). The OLCF has engaged a world-class team to support petascale science and to take a dramatic step forward, fielding new capabilities for high-end science. This report highlights the successful delivery and operation of a petascale system and shows how the OLCF fosters application development teams, developing cutting-edge tools and resources for next-generation systems.

Bland, Arthur S Buddy [ORNL; Hack, James J [ORNL; Baker, Ann E [ORNL; Barker, Ashley D [ORNL; Boudwin, Kathlyn J. [ORNL; Kendall, Ricky A [ORNL; Messer, Bronson [ORNL; Rogers, James H [ORNL; Shipman, Galen M [ORNL; White, Julia C [ORNL

2010-08-01T23:59:59.000Z

151

High Performance Computing Facility Operational Assessment, FY 2010 Oak Ridge Leadership Computing Facility  

SciTech Connect

Oak Ridge National Laboratory's (ORNL's) Cray XT5 supercomputer, Jaguar, kicked off the era of petascale scientific computing in 2008 with applications that sustained more than a thousand trillion floating point calculations per second - or 1 petaflop. Jaguar continues to grow even more powerful as it helps researchers broaden the boundaries of knowledge in virtually every domain of computational science, including weather and climate, nuclear energy, geosciences, combustion, bioenergy, fusion, and materials science. Their insights promise to broaden our knowledge in areas that are vitally important to the Department of Energy (DOE) and the nation as a whole, particularly energy assurance and climate change. The science of the 21st century, however, will demand further revolutions in computing, supercomputers capable of a million trillion calculations a second - 1 exaflop - and beyond. These systems will allow investigators to continue attacking global challenges through modeling and simulation and to unravel longstanding scientific questions. Creating such systems will also require new approaches to daunting challenges. High-performance systems of the future will need to be codesigned for scientific and engineering applications with best-in-class communications networks and data-management infrastructures and teams of skilled researchers able to take full advantage of these new resources. The Oak Ridge Leadership Computing Facility (OLCF) provides the nation's most powerful open resource for capability computing, with a sustainable path that will maintain and extend national leadership for DOE's Office of Science (SC). The OLCF has engaged a world-class team to support petascale science and to take a dramatic step forward, fielding new capabilities for high-end science. This report highlights the successful delivery and operation of a petascale system and shows how the OLCF fosters application development teams, developing cutting-edge tools and resources for next-generation systems.

Bland, Arthur S Buddy [ORNL; Hack, James J [ORNL; Baker, Ann E [ORNL; Barker, Ashley D [ORNL; Boudwin, Kathlyn J. [ORNL; Kendall, Ricky A [ORNL; Messer, Bronson [ORNL; Rogers, James H [ORNL; Shipman, Galen M [ORNL; White, Julia C [ORNL

2010-08-01T23:59:59.000Z

152

Quarterly report on Defense Nuclear Facilities Safety Board Recommendation 90-7 for the period ending June 30, 1993  

Science Conference Proceedings (OSTI)

This is the ninth quarterly report on the progress of activities that address safety issues associated with Hanford Site high-level radioactive waste tanks containing ferrocyanide compounds. Milestones completed this quarter include (1) a report on the credibility of hot spots and a recommendation on infrared scans; (2) a document discussing the strength and limitations of proposed moisture monitoring technologies; (3) limited calibration of the neutron probe in simulant-filled drums; (4) a report interpreting data from auger surface samples of ferrocyanide tank 241-BY-104; (5) a document on the effect of possible catalyst, initiator, and diluents on ferrocyanide reactivity; (6) a report on small scale sensitivity tests of ferrocyanide flowsheet simulants; and (7) preparation and shipment of T Plant simulants for calorimetric and dryout tests.

Cash, R.J.; Dukelow, G.T.; Forbes, C.J.; Meacham, J.E.

1993-10-01T23:59:59.000Z

153

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996  

DOE Green Energy (OSTI)

Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

1996-08-01T23:59:59.000Z

154

Electric and Hybrid Vehicle Program: Site Operation Program. Quarterly progress report, July--September 1995  

DOE Green Energy (OSTI)

The Site Operator Program has evolved substantially since its inception in response to the Electric Vehicle Research and Demonstration Act of 1976. In its original form, a commercialization effort was intended but this was not feasible for lack of vehicle suppliers and infrastructure. Nonetheless, with DOE sponsorship and technical participation, a few results (primarily operating experience and data) were forthcoming. The current Program comprises eleven sites and over 200 vehicles, of which about 50 are latest generation vehicles. DOE partially funds the Program participant expenditures and the INEL receives operating and maintenance data for the DOE-owned, and participant-owned or monitored vehicles, as well as Program reports. As noted elsewhere in this report, participants represent several widely differing categories: electric utilities, academic institutions, and federal agencies. While both the utilities and the academic institutions tend to establish beneficial relationships with the industrial community.

Francfort, J.; Bassett, R.R.; Briasco, S. [and others

1995-12-01T23:59:59.000Z

155

Fire protection considerations for the design and operation of liquefied petroleum gas (LPG) storage facilities  

SciTech Connect

This standard addresses the design, operation, and maintenance of LPG storage facilities from the standpoint of prevention and control of releases, fire-protection design, and fire-control measures, as well as the history of LPG storage facility failure, facility design philosophy, operating and maintenance procedures, and various fire-protection and firefighting approaches and presentations. The storage facilities covered are LPG installations (storage vessels and associated loading/unloading/transfer systems) at marine and pipeline terminals, natural gas processing plants, refineries, petrochemical plants, and tank farms.

1989-01-01T23:59:59.000Z

156

EIS-0271: Construction and Operation of a Tritium Extraction Facility at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0271: Construction and Operation of a Tritium Extraction EIS-0271: Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site EIS-0271: Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site SUMMARY DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of

157

Environmental analysis of the operation of the ERDA facilities in Oak Ridge  

SciTech Connect

An analysis of the environmental effects of current ERDA operations in Oak Ridge is being conducted to establish a baseline for the consideration of the environmental effects of additional facilities or modified operations in the future. An extensive ecological survey has been conducted for about one year; social and economic data were obtained; and an archaeological survey of the area was made. The facilities were described and the effluents associated with operations were quantified to the extent practical. The effects of effluent releases to the environment are being analyzed. The social effects of the ERDA facilities in Oak Ridge are also being studied. (auth)

McWherter, J.R.

1975-01-01T23:59:59.000Z

158

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-06-01T23:59:59.000Z

159

1Q/2Q00 M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwater Monitoring and Corrective-Action Report - First and Second Quarters 2000 - Volumes I, II, and II  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River site (SRS) during first and second quarters of 2000.

Chase, J.

2000-10-24T23:59:59.000Z

160

DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

NONE

1995-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect

This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

Norm Stanley

2011-02-01T23:59:59.000Z

162

DOE/KEURP site operator program. Year 3, Second Quarter Report, October 1--December 31, 1993  

Science Conference Proceedings (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU has purchased several electric cars and proposes to purchase additional electric vehicles. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has procured two (2) Soleq 1993 Ford EVcort station wagons. During calendar year 1994, the Kansas` electric vehicle program expects to purchase a minimum of four and a maximum of eleven additional electric vehicles. The G-Van was signed in order for the public to be aware that it was an electric vehicle. Financial participants` names have been stenciled on the back door of the van. The Soleq EvCorts have not been signed. In order to demonstrate the technology as feasible, the EvCorts were deliberately not signed. The goal is to generate a public perception that this vehicle is no different from any similar internal combustion engine vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged.

Not Available

1993-12-31T23:59:59.000Z

163

OPERATIONAL EXPERIENCE WITH THE TEST FACILITIES FOR TESLA H. Weise, DESY, Hamburg, Germany  

E-Print Network (OSTI)

OPERATIONAL EXPERIENCE WITH THE TEST FACILITIES FOR TESLA H. Weise, DESY, Hamburg, Germany Abstract The TESLA superconducting electron-positron linear collider with an integrated X-ray laser laboratory government in matters of science. In preparation of this, the TESLA Test Facility was set up at DESY. More

164

DESIGN FEATURES AND OPERATIONAL PROCEDURES FOR THE NEW BROOKHAVEN NATIONAL LABORATORY RADIATION LAUNDRY AND RECLAMATION FACILITY  

SciTech Connect

Facilities and procedures for the decontamination, reclamation, or disposal of radioactively contaminated tools, equipment, and clothing are described. For safety and economy these operations are grouped in a facility with specially designed ventilation and controls under the supervision of a health physicist. (auth)

Pearsall, S.f Gemmell, L.

1961-06-01T23:59:59.000Z

165

CRAD, Radiological Controls- Y-12 Enriched Uranium Operations Oxide Conversion Facility  

Energy.gov (U.S. Department of Energy (DOE))

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January 2005 assessment of the Radiation Protection Program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility.

166

Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual  

SciTech Connect

This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

IRWIN, J.J.

1999-07-02T23:59:59.000Z

167

U.S. CMS - U.S. CMS @ Work - Data and Computing - Facility Operations...  

NLE Websites -- All DOE Office Websites (Extended Search)

File Transfer Batch Systems CRAB Quota and Usage Statistics CERN Bluearc Quota and Stats System Status U.S. CMS Grid Facility Operations: Batch System Batch Systems: The batch...

168

Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying (CVD) Facility Operations Manual  

Science Conference Proceedings (OSTI)

This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of the Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the spent nuclear fuel project (SNFP) Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

IRWIN, J.J.

2000-02-03T23:59:59.000Z

169

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2011 [Facility News, Publications] 8, 2011 [Facility News, Publications] Journal Special Issue Includes Mobile Facility Data from Germany Bookmark and Share The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. In 2007, the ARM Mobile Facility participated in one of the most ambitious field studies ever conducted in Europe-the Convective and Orographically Induced Precipitation Study (COPS). Now, 21 papers published in a special issue of the Quarterly Journal of the Royal Meteorological Society demonstrate that the data collected during COPS are providing new insight into: the key chemical and physical processes leading to convection initiation and to the modification of precipitation by orography;

170

Guidelines for Operating an Interim On Site Low Level Radioactive Waste Storage Facility - Revision 1  

Science Conference Proceedings (OSTI)

The majority of commercial USA nuclear stations have constructed on-site LLW storage facilities, and most of these same utilities are experiencing or have experienced at least one period of interim on-site storage. These Guidelines focus on operational considerations and incorporate many of the lessons learned while operating various types of LLW storage facilities. This document was reviewed by the USNRC. Subsequently, the USNRC issued RIS 2008-32, Interim LLRW Storage at NPPs, which recognizes the meth...

2009-02-23T23:59:59.000Z

171

300 Area treated effluent disposal facility operating specifications document  

Science Conference Proceedings (OSTI)

These specifications deal with the release of treated water into the Columbia River via the TEDF submerged outfall. Specific limits are set for contaminants to be discharged in NPDES permit WA-002591-7. This section contains the operating ranges that will be used to best meet the permit limits.

Olander, A.R.

1994-10-01T23:59:59.000Z

172

Standard Guide for Dry Lead Glass and Oil-Filled Lead Glass Radiation Shielding Window Components for Remotely Operated Facilities  

E-Print Network (OSTI)

Standard Guide for Dry Lead Glass and Oil-Filled Lead Glass Radiation Shielding Window Components for Remotely Operated Facilities

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

173

Comparative Study of Vibration Stability at Operating Light Source Facilities and Lessons Learned in Achieving NSLS II Stability Goals  

E-Print Network (OSTI)

Comparative Study of Vibration Stability at Operating Light Source Facilities and Lessons Learned in Achieving NSLS II Stability Goals

Simos, N; Fallier, M

2008-01-01T23:59:59.000Z

174

ERDA Geothermal Component Test Facility (GCTF), East Mesa, Imperial Valley, California. Test operations management plan  

DOE Green Energy (OSTI)

Discussion of the operation of the Geothermal Component Test Facility (GCTF), established for testing heat extraction and energy conversion equipment and materials, is presented under the following section headings: purposes of the facility; operating policies: service, conflicts, safety and environmental, investigator activities, shops and equipment, and test certification; organization: chart; Lawrence Berkely Laboratory: organization, responsibilities, individual responsibilities, and funding; Bureau of Reclamation: organization, responsibilities, and funding; operations contractor: contract, qualifications, and personnel; Test Operations Advisory Board; experiment processing: test acceptance, scheduling and priorities, cost reimbursement, and activities flow chart.

Not Available

1976-01-01T23:59:59.000Z

175

A comparative study of worker and general public risks from nuclear facility operation using MACCS2  

Science Conference Proceedings (OSTI)

Over the last five years, the US Department of Energy (DOE) has attempted to establish quantitative risk indices as minimum acceptance criteria for assurance of safe operation of its nuclear facilities. The risk indices serve as aiming points or targets to include consideration of all aspects of operation including normal conditions as well as abnormal, design basis events, and beyond-design basis events. Although initial focus of the application of these safety targets had been on DOE`s reactors, more recent assessments have also considered non-reactor facilities including those encompassing storage and nuclear processing activities. Regardless of the facility`s primary function, accident progression, event tree/fault tree logic models, and probabilistic (dose) consequence assessment model must be implemented to yield a fully integrated analysis of facility operation. The primary tool for probabilistic consequence assessment in the US is the MELCOR Accident Consequence Code System (MACCS). In this study, two version of MACCS are applied to representative source terms developed in the safety analysis associated with a waste processing facility at the Westinghouse Savannah River Company`s (WSRC`s) Savannah River Site (SRS). The MACCS versions are used to estimate population dose and subsequent health effects to workers and the general public from the SRS referenced facility operation. When combined with the frequency of occurrence evaluation, the margin of compliance with the safety targets may be quantified.

East, J.M.; O`Kula, K.R.

1994-10-01T23:59:59.000Z

176

FAQ 27-Are there any currently-operating disposal facilities that can  

NLE Websites -- All DOE Office Websites (Extended Search)

currently-operating disposal facilities that can accept all of the depleted uranium oxide that would be generated from conversion of DOE's depleted UF6 inventory? currently-operating disposal facilities that can accept all of the depleted uranium oxide that would be generated from conversion of DOE's depleted UF6 inventory? Are there any currently-operating disposal facilities that can accept all of the depleted uranium oxide that would be generated from conversion of DOE's depleted UF6 inventory? With respect to available capacity, three sites could accept the entire inventory of depleted uranium oxide: the Department of Energy's (DOE's) Hanford site in Washington State, DOE's Nevada Test Site, or EnergySolution Clive, Utah Facility, a commercial site. Each of these sites would have sufficient capacity for either the grouted or ungrouted oxide forms of depleted uranium (for the two DOE sites, this also takes into account other projected disposal volumes through the year 2070).

177

Site Resources, Facilities & Operations Directorate, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Resources Division Site Resources Division Homepage The mission of the Site Resources Division is to enhance the site aesthetic so as to improve staff recruitment and retention, safety, and customer satisfaction, and to support the overall Laboratory mission. To that end, we are dedicated to providing services to the Laboratory at the highest standard per science dollar. The Site Resources Division is responsible for the following: Custodial Services BNL Recycling Program Sanitation Grounds Maintenance, including limited herbicide applications Masonry Operation and maintenance of light and heavy machine equipment, including elevators and emergency generators Rigging & Hoisting Pest control Clean-up of outdoor and select indoor spills Top of Page Last Modified: February 28, 2011

178

The Mixed Waste Management Facility. Design basis integrated operations plan (Title I design)  

SciTech Connect

The Mixed Waste Management Facility (MWMF) will be a fully integrated, pilotscale facility for the demonstration of low-level, organic-matrix mixed waste treatment technologies. It will provide the bridge from bench-scale demonstrated technologies to the deployment and operation of full-scale treatment facilities. The MWMF is a key element in reducing the risk in deployment of effective and environmentally acceptable treatment processes for organic mixed-waste streams. The MWMF will provide the engineering test data, formal evaluation, and operating experience that will be required for these demonstration systems to become accepted by EPA and deployable in waste treatment facilities. The deployment will also demonstrate how to approach the permitting process with the regulatory agencies and how to operate and maintain the processes in a safe manner. This document describes, at a high level, how the facility will be designed and operated to achieve this mission. It frequently refers the reader to additional documentation that provides more detail in specific areas. Effective evaluation of a technology consists of a variety of informal and formal demonstrations involving individual technology systems or subsystems, integrated technology system combinations, or complete integrated treatment trains. Informal demonstrations will typically be used to gather general operating information and to establish a basis for development of formal demonstration plans. Formal demonstrations consist of a specific series of tests that are used to rigorously demonstrate the operation or performance of a specific system configuration.

NONE

1994-12-01T23:59:59.000Z

179

Construction and operation of an improved radiation calibration facility at Brookhaven National Laboratory. Environmental assessment  

Science Conference Proceedings (OSTI)

Calibration of instruments used to detect and measure ionizing radiation has been conducted over the last 20 years at Brookhaven National Laboratory`s (BNL) Radiation Calibration Facility, Building 348. Growth of research facilities, projects in progress, and more stringent Department of Energy (DOE) orders which involve exposure to nuclear radiation have placed substantial burdens on the existing radiation calibration facility. The facility currently does not meet the requirements of DOE Order 5480.4 or American National Standards Institute (ANSI) N323-1978, which establish calibration methods for portable radiation protection instruments used in the detection and measurement of levels of ionizing radiation fields or levels of radioactive surface contaminations. Failure to comply with this standard could mean instrumentation is not being calibrated to necessary levels of sensitivity. The Laboratory has also recently obtained a new neutron source and gamma beam irradiator which can not be made operational at existing facilities because of geometry and shielding inadequacies. These sources are needed to perform routine periodic calibrations of radiation detecting instruments used by scientific and technical personnel and to meet BNL`s substantial increase in demand for radiation monitoring capabilities. To place these new sources into operation, it is proposed to construct an addition to the existing radiation calibration facility that would house all calibration sources and bring BNL calibration activities into compliance with DOE and ANSI standards. The purpose of this assessment is to identify potential significant environmental impacts associated with the construction and operation of an improved radiation calibration facility at BNL.

NONE

1994-10-01T23:59:59.000Z

180

U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Oak Ridge Operations Office Nuclear Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] "This self-study guide provides an overview of safety basis terminology, requirements, and activities that are applicable to DOE and Oak Ridge Operations Office (ORO) nuclear facilities on the Oak Ridge Reservation. By completing this self-study guide, the reader will fulfill ORO Safety Basis Qualification Standard Competency 1, 2 (Part 1), or 7 (Part 1) and gain a familiarity level of knowledge regarding the following:

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy, Oak Ridge Operations Office Nuclear U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] U.S. Department of Energy, Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide [Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1)] "This self-study guide provides an overview of safety basis terminology, requirements, and activities that are applicable to DOE and Oak Ridge Operations Office (ORO) nuclear facilities on the Oak Ridge Reservation. By completing this self-study guide, the reader will fulfill ORO Safety Basis Qualification Standard Competency 1, 2 (Part 1), or 7 (Part 1) and gain a familiarity level of knowledge regarding the following:

182

Development of a safety assessment approach for decontamination and decommissioning operations at nuclear facilities  

SciTech Connect

The US Department of Energy (DOE) is responsible for nearly 1000 nuclear facilities which will eventually be decommissioned. In order to ensure that the health and safety of the workers, other personnel on site and the public in general is maintained during decontamination and decommissioning (D&D) operations, a methodology specifically for use in evaluating the nuclear safety of the associated activities is being developed within the Department. This methodology represents not so much a departure from that currently fish in the DOE when conducting safety assessments of operations at nuclear facilities but, rather, a formalization of those methods specifically adapted to the D&D activities. As such, it is intended to provide the safety assessment personnel with a framework on which they can base their technical judgement, to assure a consistent approach to safety assessment of D&D operations and to facilitate the systematic collection of data from facilities in the post-operational part of the life cycle.

Worthington, P.R. [USDOE, Washington, DC (United States); Cowgill, M.G. [Brookhaven National Lab., Upton, NY (United States)

1994-12-31T23:59:59.000Z

183

Operating experience review - Ventilation systems at Department of Energy Facilities  

Science Conference Proceedings (OSTI)

The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

Not Available

1994-05-01T23:59:59.000Z

184

High Performance Computing Facility Operational Assessment, CY 2011 Oak Ridge Leadership Computing Facility  

Science Conference Proceedings (OSTI)

Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.4 billion core hours in calendar year (CY) 2011 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Users reported more than 670 publications this year arising from their use of OLCF resources. Of these we report the 300 in this review that are consistent with guidance provided. Scientific achievements by OLCF users cut across all range scales from atomic to molecular to large-scale structures. At the atomic scale, researchers discovered that the anomalously long half-life of Carbon-14 can be explained by calculating, for the first time, the very complex three-body interactions between all the neutrons and protons in the nucleus. At the molecular scale, researchers combined experimental results from LBL's light source and simulations on Jaguar to discover how DNA replication continues past a damaged site so a mutation can be repaired later. Other researchers combined experimental results from ORNL's Spallation Neutron Source and simulations on Jaguar to reveal the molecular structure of ligno-cellulosic material used in bioethanol production. This year, Jaguar has been used to do billion-cell CFD calculations to develop shock wave compression turbo machinery as a means to meet DOE goals for reducing carbon sequestration costs. General Electric used Jaguar to calculate the unsteady flow through turbo machinery to learn what efficiencies the traditional steady flow assumption is hiding from designers. Even a 1% improvement in turbine design can save the nation billions of gallons of fuel.

Baker, Ann E [ORNL; Barker, Ashley D [ORNL; Bland, Arthur S Buddy [ORNL; Boudwin, Kathlyn J. [ORNL; Hack, James J [ORNL; Kendall, Ricky A [ORNL; Messer, Bronson [ORNL; Rogers, James H [ORNL; Shipman, Galen M [ORNL; Wells, Jack C [ORNL; White, Julia C [ORNL; Hudson, Douglas L [ORNL

2012-02-01T23:59:59.000Z

185

Architecture and operation of the Z Pulsed Power Facility vacuum system.  

SciTech Connect

The Z Pulsed Power Facility at Sandia National Laboratories in Albuquerque, New Mexico, USA is one of the world's premier high energy density physics facilities. The Z Facility derives its name from the z-pinch phenomena which is a type of plasma confinement system that uses the electrical current in the plasma to generate a magnetic field that compresses it. Z refers to the direction of current flow, the z axis in a three dimensional Cartesian coordinate system. The multiterawatt, multimegajoule electrical pulse the Facility produces is 100-400 nanoseconds in time. Research and development programs currently being conducted on the Z Facility include inertial confinement fusion, dynamic material properties, laboratory astrophysics and radiation effects. The Z Facility vacuum system consists of two subsystems, center section and load diagnostics. Dry roughing pumps and cryogenic high vacuum pumps are used to evacuate the 40,000 liter, 200 square meter center section of the facility where the experimental load is located. Pumping times on the order of two hours are required to reduce the pressure from atmospheric to 10{sup -5} Torr. The center section is cycled from atmosphere to high vacuum for each experiment. The facility is capable of conducting one to two experiments per day. Numerous smaller vacuum pumping systems are used to evacuate load diagnostics. The megajoules of energy released during an experiment causes damage to the Facility that presents numerous challenges for reliable operation of the vacuum system.

Riddle, Allen Chauncey; Petmecky, Don; Weed, John Woodruff

2010-11-01T23:59:59.000Z

186

LESSONS LEARNED - STARTUP AND TRANSITION TO OPERATIONS AT THE 200 WEST PUMP AND TREAT FACILITY  

SciTech Connect

This document lists key Lessons Learned from the Startup Team for the 200 West Pump and Treat Facility Project. The Startup Team on this Project was an integrated, multi-discipline team whose scope was Construction Acceptance Testing (CAT), functional Acceptance Testing Procedures (ATP), and procedure development and implementation. Both maintenance and operations procedures were developed. Included in the operations procedures were the process unit operations. In addition, a training and qualification program was also part of the scope.

FINK DE; BERGQUIST GG; BURKE SP

2012-10-03T23:59:59.000Z

187

Optimization Measures for Sporting and Special Event Facilities: Design and Operation  

E-Print Network (OSTI)

Reducing unnecessary building energy costs is becoming more of a priority. Rising fuel prices and a global emphasis on energy efficiency are key contributing factors. This push towards energy efficiency certainly applies to today's athletic and special event facilities. High customer expectations and corresponding large operating expenses have helped to make energy conservation measures more of a priority in the facilities design. The heating, ventilation, and air conditioning (HVAC) systems in sporting and special event facility present a unique challenge to Continuous Commissioning (CC) engineers. In such facilities, high occupancy and equipment loads occur at the design load condition, but only a small fraction of the designed capacity is necessary for routine operations. On the other hand, during games and other events, system performance is critical. Therefore, significant savings potential exists, but care must be taken to avoid compromising the peak load operations. Maintenance uncertainties, equipment wear, and lack of operator knowledge all combine to affect the building operating costs. Continuous Commissioning, a process developed by the Texas A&M Energy Systems Laboratory, addresses issues such as these and proves very worthwhile. An overview of multi-purpose arenas and their usage will be given, and potential optimization measures and Continuous Commissioning of these facilities will be presented, along with some illustrative examples.

Giebler, T.; Wei, G.; Deng, S.; Claridge, D. E.; Turner, W. D.; Liu, M.

2000-01-01T23:59:59.000Z

188

Model training curriculum for Low-Level Radioactive Waste Disposal Facility Operations  

Science Conference Proceedings (OSTI)

This document is to assist in the development of the training programs required to be in place for the operating license for a low-level radioactive waste disposal facility. It consists of an introductory document and four additional appendixes of individual training program curricula. This information will provide the starting point for the more detailed facility-specific training programs that will be developed as the facility hires and trains new personnel and begins operation. This document is comprehensive and is intended as a guide for the development of a company- or facility-specific program. The individual licensee does not need to use this model training curriculum as written. Instead, this document can be used as a menu for the development, modification, or verification of customized training programs.

Tyner, C.J.; Birk, S.M.

1995-09-01T23:59:59.000Z

189

Operational Awareness Oversight of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility, July 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

ANL-2012-07-20 ANL-2012-07-20 Site: Argonne National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations (HS-45) Activity Report for Operational Awareness Oversight of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Dates of Activity : 07/17/2012 - 07/20/2012 Report Preparer: Joseph P. Drago Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was to shadow the Argonne Site Office (ASO) Facility Representative (FR) performing a review of the technical safety requirements (TSRs) for the Alpha-Gamma Hot Cell Facility (AGHCF), a hazard category 2 nuclear facility. The ASO review evaluated the flow down of the TSRs into the facility documentation of surveillance procedures, datasheets, and the performance of the surveillance.

190

Operational Awareness Oversight of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility, July 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ANL-2012-07-20 ANL-2012-07-20 Site: Argonne National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations (HS-45) Activity Report for Operational Awareness Oversight of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Dates of Activity : 07/17/2012 - 07/20/2012 Report Preparer: Joseph P. Drago Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) activity was to shadow the Argonne Site Office (ASO) Facility Representative (FR) performing a review of the technical safety requirements (TSRs) for the Alpha-Gamma Hot Cell Facility (AGHCF), a hazard category 2 nuclear facility. The ASO review evaluated the flow down of the TSRs into the facility documentation of surveillance procedures, datasheets, and the performance of the surveillance.

191

Treated Effluent Disposal Facility (TEDF) Operator Training Station (OTS) System Configuration Management Plan  

Science Conference Proceedings (OSTI)

The Treated Effluent Disposal Facility Operator Training Station (TEDF OTS) is a computer based training tool designed to aid plant operations and engineering staff in familiarizing themselves with the TEDF Central Control System (CCS). It consists of PC compatible computers and a Programmable Logic Controller (PLC) designed to emulate the responses of various plant components connected to or under the control of the CCS. The system trains operators by simulating the normal operation but also has the ability to force failures of different equipment allowing the operator to react and observe the events. The paper describes organization, responsibilities, system configuration management activities, software, and action plans for fully utilizing the simulation program.

Carter, R.L. Jr.

1994-06-01T23:59:59.000Z

192

Environmental monitoring for detection of uranium enrichment operations: Comparison of LEU and HEU facilities  

SciTech Connect

In 1994, the International Atomic Energy Agency (IAEA) initiated an ambitious program of worldwide field trials to evaluate the utility of environmental monitoring for safeguards. Part of this program involved two extensive United States field trials conducted at the large uranium enrichment facilities. The Paducah operation involves a large low-enriched uranium (LEU) gaseous diffusion plant while the Portsmouth facilities include a large gaseous diffusion plant that has produced both LEU and high-enriched uranium (HEU) as well as an LEU centrifuge facility. As a result of the Energy Policy Act of 1992, management of the uranium enrichment operations was assumed by the US Enrichment Corporation (USEC). The facilities are operated under contract by Martin Marietta Utility Services. Martin Marietta Energy Systems manages the environmental restoration and waste management programs at Portsmouth and Paducah for DOE. These field trials were conducted. Samples included swipes from inside and outside process buildings, vegetation and soil samples taken from locations up to 8 km from main sites, and hydrologic samples taken on the sites and at varying distances from the sites. Analytical results from bulk analysis were obtained using high abundance sensitivity thermal ionization mm spectrometers (TIMS). Uranium isotopics altered from the normal background percentages were found for all the sample types listed above, even on vegetation 5 km from one of the enrichment facilities. The results from these field trials demonstrate that dilution by natural background uranium does not remove from environmental samples the distinctive signatures that are characteristic of enrichment operations. Data from swipe samples taken within the enrichment facilities were particularly revealing. Particulate analysis of these swipes provided a detailed ``history`` of both facilities, including the assays of the end product and tails for both facilities.

Hembree, D.M. Jr.; Carter, J.A.; Ross, H.H.

1995-03-01T23:59:59.000Z

193

F-Area Hazardous Waste Management Facility Correction Action Report, Third and Fourth Quarter 1998, Volumes I and II  

Science Conference Proceedings (OSTI)

The groundwater in the uppermost aquifer beneath the F-Area Hazardous Waste Management Facility (HWMF), also known as the F-Area Seepage Basins, at the Savannah Site (SRS) is monitored periodically for selected hazardous and radioactive constituents. This report presents the results of the required groundwater monitoring program.

Chase, J.

1999-04-23T23:59:59.000Z

194

SDG and E - DOE Geothermal Loop Experimental Facility. Quarterly report, July-September 1977 and annual report for the year ending September 1977  

DOE Green Energy (OSTI)

This facility utilizes the flash/binary process for the extraction of energy from geothermal brine. Substantial data on brine and steam chemical characteristics, scaling characteristics, scaling rates, and the interaction of these parameters with other plant operating parameters has been obtained. This data is being stored and reduced by Lawrence Berkeley Laboratory (LBL). Tests are continuing for one and two-well operation. Development of solutions to the scaling problem, and additional testing are being performed as required.

Bishop, H.K.; Bricarello, J.R.; Enos, F.L.; Hanenburg, W.H.; Hodgdon, N.C.; Jacobson, W.O.; Li, K.K.; Swanson, C.R.

1977-10-01T23:59:59.000Z

195

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE issued the Draft SEIS for public review and comment by mailings to stakeholders and by announcements in the Federal Register (FR) on November 5, 1999, (64 FR 60430) (Attachment 4 of Volume I) and on November 12, 1999 (64 FR 61635) correcting a document title (Attachment 5 of Volume I). On

196

Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration, June 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-22 6-22 Site: DOE-Richland Operations Office Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration Dates of Activity : 06/20/2011 - 06/22/2011 Report Preparer: Jake Wechselberger Activity Description/Purpose: The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an operational awareness review of the Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration. Result: During the period June 20-22, 2011, an HSS representative participated in an operational assessment of the Cold Vacuum

197

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

than any other quarter on record-961 The U.S. Department of Energy requires national user facilities to report facility use by total visitor days and facility to track actual...

198

Defense programs occurrence analysis report for third quarter CY-1991  

Science Conference Proceedings (OSTI)

The quarterly Defense Programs Occurrence Analysis Report (DPOAR) is compiled by the Office of Self-Assessment and Emergency Management (DP-9). It utilizes the Occurrence Reporting and Processing System (ORPS) data to assess the quality and effectiveness of the reporting process and the significance of the occurrences. In addition, areas where further improvement and corrective actions are necessary is fully demonstrated by an analysis of the data. The results of the assessment may also be used as the basis for conducting other evaluations such as the diagnostic and augmented evaluations. This quarterly report provides feedback to DOE/DP and contractor management to improve the control of operations and achieve a higher standard of excellence. The report analyzes one year of ORPS data at the end of each calendar quarter, therefore, the performance of DP Field Offices and facilities will be continuously compared to their past quarter and yearly performances. During this assessment from 1 October 1990 through 30 September 1991, there were a number of initiatives that were undertaken by Field Office management to improve the overall performance and the quality of the Occurrence Reporting and Processing System. These initiatives include the training of their staff for self-assessment activities. These intiatives can be found in the programs implemented according to the DOE Conduct of Operations and Occurrence Reporting and Processing of Operations Information Orders. These initiatives were found to be, based on the ORPS data, stronger at Albuquerque, Nevada, Oak Ridge Field Offices and Richland DP facilities.

Not Available

1991-12-01T23:59:59.000Z

199

200 Area Treated Effluent Disposal Facility operational test specification. Revision 2  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met. The technical requirements for operational testing of the 200 Area TEDF are defined by the test requirements presented in Appendix A. These test requirements demonstrate the following: pump station No.1 and associated support equipment operate both automatically and manually; pump station No. 2 and associated support equipment operate both automatically and manually; water is transported through the collection and transfer lines to the disposal ponds with no detectable leakage; the disposal ponds accept flow from the transfer lines with all support equipment operating as designed; and the control systems operate and status the 200 Area TEDF including monitoring of appropriate generator discharge parameters.

Crane, A.F.

1995-02-09T23:59:59.000Z

200

Electric and hybrid vehicle program, site operator program quarterly progress report for April through June 1996 (third quarter of fiscal year 1996)  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) Site Operator Program was initially established to meet the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. The Program has since evolved in response to new legislation and interests. The goals of the Site Operator Program include the field evaluation of electric vehicles (EVs) in real-world applications and environments; the advancement of electric vehicle technologies; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of EVs by the public. The Site Operator Program currently consists of eleven participants under contract and two other organizations that have data-sharing agreements with the Program (Table ES-1). Several national organizations have joined DOE to further the introduction and awareness of electric vehicles, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for electric vehicles; and (2) DOE, the Department of Transportation, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of electric vehicles. The current focus of the Program is the collection and dissemination of EV operations and performance data to aid in the evaluation of real-world EV use. This report contains several sections with vehicle evaluation as a focus.

Francfort, J. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

FACILITIES MAINTENANCE & UPKEEP The Lawrence campus is operating three different custodial and maintenance groups on campus resulting in  

E-Print Network (OSTI)

facilities management system, and provide the adequate tools and training necessary. · Implementing contemporary zone maintenance will reduce management and layers, enabling costFACILITIES MAINTENANCE & UPKEEP Context · The Lawrence campus is operating three

Peterson, Blake R.

202

U.S. Department of Energy Nevada Operations Office environmental monitoring program summary data report, first calendar quarter 1997  

SciTech Connect

The continuing moratorium on the testing of nuclear explosive devices, possibility of alternate uses for the Nevada Test Site (NTS), and reduced budget have led to significant changes in the extent of environmental surveillance activities on and around the NTS. Not only have the number of monitored locations been reduced since 1992, but also the frequency and types of analyses have been changed. The onsite radiological surveillance program is shown in a table, and this report gives the first quarter results for that program. During the first calendar quarter of 1997, air samples were collected and analyzed from 45 air particulate sampling stations, 3 noble gas sampling stations, and 12 tritiated water (HTO) vapor sampling stations. Surface water samples were collected and analyzed from one wastewater containment pond and nine sewage lagoons. Groundwater samples were obtained from ten potable supply wells, one non-potable supply well, and seven drinking water distribution end points. Ambient radiation levels were measured at 168 locations.

Black, S.C.; Haworth, O.L.; Townsend, Y.E. [eds.

1997-10-01T23:59:59.000Z

203

Guide for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility  

Science Conference Proceedings (OSTI)

As a result of increasing low-level waste (LLW) disposal site uncertainty, the industry expects that utilities will have to rely on their own on-site storage LLW storage programs in the near future. This report captures essential information related to the operation of an on-site LLW storage program. The report is a comprehensive reference to which utilities can routinely refer throughout the development and implementation of the storage program and operation of the storage facility.

2004-11-16T23:59:59.000Z

204

Review of operating experience at the Los Alamos Plutonium Electrorefining Facility, 1963-1977  

Science Conference Proceedings (OSTI)

This report reviews the operation of the Los Alamos Plutonium Electrorefining Plant at Technical Area 21 for the period 1964 through 1977. During that period, approximately 1568 kg of plutonium metal, > 99.95% pure, was produced in 653 runs from 1930 kg of metal fabrication scrap, 99% pure. General considerations of the electrorefining process and facility operation and recommendations for further improvement of the process are discussed.

Mullins, L.J.; Morgan, A.N.

1981-12-01T23:59:59.000Z

205

: The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resumption of Criticality Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site OAS-M-13-09 September 2013 Department of Energy Washington, DC 20585 September 30, 2013 MEMORANDUM FOR THE PRINCIPAL DEPUTY ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site" BACKGROUND The mission of the Criticality Experiments Facility, located at the Los Alamos National Laboratory (Los Alamos) was to conduct nuclear criticality experiments and hands-on training in nuclear safeguards, criticality safety and emergency response in support of the National

206

University of Washington Clinical Neutron Facility: Report on 26 Years of Operation  

Science Conference Proceedings (OSTI)

Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi [Department of Radiation Oncology, Box 356043 University of Washington Medical Center Seattle, WA 98195-6043 (United States)

2011-12-13T23:59:59.000Z

207

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 [Facility News] 1, 2011 [Facility News] Data from Field Campaign in Black Forest, Germany, are Red Hot Bookmark and Share During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. A paper published in a special issue of the Quarterly Journal of the Royal Meteorological Society describing the scientific strategy, field phase, and

208

Microsoft Word - ACRF4thQuarterFY09 draft_nb__sal.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 - September 30, 2009 Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research July 1 - September 30, 2009, DOE/SC-ARM/P-09-016 iii Contents 1. Data Availability ................................................................................................................................... 1 2. Scientific Users ..................................................................................................................................... 2 3. Safety .................................................................................................................................................... 4

209

Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996  

SciTech Connect

This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

1998-02-01T23:59:59.000Z

210

Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

T T E D S T A T E S O F A M E R I C A D E P A R T M E NT O F E N E R G Y DOE/EIS-0271 Construction & Operation of a Tritium Extraction Facility at the Savannah River Site Department of Energy Savannah River Operations Office Aiken, South Carolina Final Environmental Impact Statement March 1999 DOE/EIS-0271 March 1999 Preface iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement: Construction and Operation of a Tritium Extraction Facility at the Savannah River Site (DOE/EIS-0271) LOCATION: Aiken and Barnwell Counties, South Carolina CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy

211

Operational readiness review for the Waste Experimental Reduction Facility. Final report  

SciTech Connect

An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory`s (INEL`s) Waste Experimental Reduction Facility (WERF) was conducted by EG&G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report.

Not Available

1993-11-01T23:59:59.000Z

212

US Department of Energy, Nevada Operations Office Environmental Monitoring Program summary data report. Second calendar quarter--1997  

SciTech Connect

The moratorium on the testing of nuclear explosive devices, possibility of alternate uses for the Nevada Test Site (NTS), and reduced budget have led to significant changes in the extent of environmental surveillance activities on and around the NTS. Not only have the number of monitored locations been reduced since 1992, but also the frequency and types of analyses have been changed. This report consists of a summary of the radiological and non-radiological data collected and analyzed during the second quarter of 1997.

Black, S.C.; Haworth, O.L.; Townsend, Y.E. [eds.

1997-12-01T23:59:59.000Z

213

EIS-0388: Operation of a Biosafety Level 3 Facility at the Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the operation of a Biosafety Level 3 Facility (BSL3 Facility) at the Los Alamos National Laboratory (LANL). A BSL-2 Alternative, an existing BSL-2 permitted facility, and a No Action Alternative will be analyzed. The EIS is currently on hold.

214

Audit of the radioactive liquid waste treatment facility operations at the Los Alamos National Laboratory  

SciTech Connect

Los Alamos National Laboratory (Los Alamos) generates radioactive and liquid wastes that must be treated before being discharged to the environment. Presently, the liquid wastes are treated in the Radioactive Liquid Waste Treatment Facility (Treatment Facility), which is over 30 years old and in need of repair or replacement. However, there are various ways to satisfy the treatment need. The objective of the audit was to determine whether Los Alamos cost effectively managed its Treatment Facility operations. The audit determined that Los Alamos` treatment costs were significantly higher when compared to similar costs incurred by the private sector. This situation occurred because Los Alamos did not perform a complete analysis of privatization or prepare a {open_quotes}make-or-buy{close_quotes} plan for its treatment operations, although a {open_quotes}make-or-buy{close_quotes} plan requirement was incorporated into the contract in 1996. As a result, Los Alamos may be spending $2.15 million more than necessary each year and could needlessly spend $10.75 million over the next five years to treat its radioactive liquid waste. In addition, Los Alamos has proposed to spend $13 million for a new treatment facility that may not be needed if privatization proves to be a cost effective alternative. We recommended that the Manager, Albuquerque Operations Office (Albuquerque), (1) require Los Alamos to prepare a {open_quotes}make-or-buy{close_quotes} plan for its radioactive liquid waste treatment operations, (2) review the plan for approval, and (3) direct Los Alamos to select the most cost effective method of operations while also considering other factors such as mission support, reliability, and long-term program needs. Albuquerque concurred with the recommendations.

1997-11-19T23:59:59.000Z

215

Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

Not Available

1992-09-01T23:59:59.000Z

216

Design Considerations and Operating Experience of the Sanford Com Test Facility  

E-Print Network (OSTI)

A 400 MW oil-fired boiler was fitted with new burner guns and accessories to burn coal/oil mixture (COM) for a 120 full-power burn-day demonstration. Coal unloading and storage, and COM preparation and storage facilities were installed adjacent to the power house. Modifications to the steam generator and firing systems were made as the test program progressed. Burn tests through 50 percent coal (by weight) were completed, and optimization and long term test programs with 40 percent coal were completed. This paper describes the reasons for the demonstration, the project schedule, and the test facility itself. Discussions are also included of the rationale for equipment and process selection, the test program, and some of the operating experience that should be considered in the design of future permanent facilities.

Causilla, H.; Kasprik, A. J.

1982-01-01T23:59:59.000Z

217

Program for documenting the criticality safety basis for operations in a research and development facility consistent with new regulatory requirements  

SciTech Connect

A program was developed and implemented at LLNL to provide more detailed, documented Criticality Safety Evaluations of operations in an R&D facility. The new Criticality Safety evaluations were consistent with regulatory requirements of the then new DOE Order 5480.24, Nuclear Criticality Safety. The evaluations provide a criticality safety basis for each operation in the facility in support of the facility Safety Analysis Report. This implementation program provided a transition from one method of conducting and documenting Criticality Safety Evaluations to a new method consistent with new regulatory requirements. The program also allowed continued safe operation of the facility while the new implementation level Criticality Safety Evaluations were developed.

Pearson, J.S.; Evarts, R.B.; Huang, S.T.; Goebel, G.

1997-04-24T23:59:59.000Z

218

Design and operation of the coke-oven gas sulfur removal facility at Geneva Steel  

Science Conference Proceedings (OSTI)

The coke-oven gas sulfur removal facility at Geneva Steel utilizes a combination of two technologies which had never been used together. These two technologies had proven effective separately and now in combination. However, it brought unique operational considerations which has never been considered previously. The front end of the facility is a Sulfiban process. This monoethanolamine (MEA) process effectively absorbs hydrogen sulfide and other acid gases from coke-oven gas. The final step in sulfur removal uses a Lo-Cat II. The Lo-Cat process absorbs and subsequently oxidizes H{sub 2}S to elemental sulfur. These two processes have been effective in reducing sulfur dioxide emissions from coke-oven gas by 95%. Since the end of the start-up and optimization phase, emission rate has stayed below the 104.5 lb/hr limit of equivalent SO{sub 2} (based on a 24-hr average). In Jan. 1995, the emission rate from the sulfur removal facility averaged 86.7 lb/hr with less than 20 lb/hr from the Econobator exhaust. The challenges yet to be met are decreasing the operating expenses of the sulfur removal facility, notably chemical costs, and minimizing the impact of the heating system on unit reliability.

Havili, M.U.; Fraser-Smyth, L.L.; Wood, B.W. [Geneva Steel, Provo, UT (United States)

1996-02-01T23:59:59.000Z

219

Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSS-2011-04-28 NNSS-2011-04-28 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit Dates of Activity: 04/25/2011 - 04/28/2011 Report Preparer William Macon Activity Description/Purpose: In coordination with the National Nuclear Security Administration (NNSA) Service Center, the Office of Health, Safety and Security (HSS) site lead participated in a pre-visit for the NNSA Operational Readiness Review (ORR) of the Joint Actinide Shock Physics Experimental Research (JASPER) facility restart conducted April 25-28, 2011. The site lead also participated

220

Lawrence Livermore National Laboratory Operational Drill at the B332 Plutonium Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Independent Activity Report - Rev. 0 Report Number: HIAR LLNL-2013-02-27 Site: Lawrence Livermore National Laboratory (LLNL) Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Lawrence Livermore National Laboratory Operational Drill at the B332 Plutonium Facility Date of Activity: 02/27/2013 Report Preparer: Thomas Rogers Activity Description/Purpose: The Livermore Site Office (LSO) and Lawrence Livermore National Security, LLC (LLNS) requested personnel from the U.S. Department of Energy (DOE) Office of Safety and Emergency Management Evaluations (HS-45) to observe an operational drill at the Plutonium Facility in Building 332 (B332). LSO and LLNS desired HS-45's participation to help

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

U.S. CMS - U.S. CMS @ Work - Data and Computing - Facility Operations -  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Computing Facility Operations Data and Computing Facility Operations In This Section: Getting Started Computing Environment Resources Setup Software Tutorials, Documentation, How Tos Mass Storage File Transfer Batch Systems CRAB Quota and Usage Statistics CERN Bluearc Quota and Stats System Status U.S. CMS Grid Data Transfer to and from UAF At Fermilab, access to User Analysis Farm (UAF) goes through cmsuaf.fnal.gov. This can be accessed using Secure Copy (scp) or sftp. The following storage areas on NFS are available for users: /uscms/home/username /uscms_data/d1/username To transfer a file to UAF: Usage: scp file_name username@cmsuaf.fnal.gov:/uscms/home/username e.g. $ scp zprime705.jdf wenzel@cmsuaf.fnal.gov:/uscms/home/wenzel zprime705.jdf 100% |*****************************| 286 00:00

222

Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of waste with 39,000 Curies of radioactivity had been placed in the ERDF. In 2006, events occurred that affected the operation of the automatic leachate transfer pumps and a technician confessed to having not performed compaction tests and to falsification of the data.

223

U.S. CMS - U.S. CMS @ Work - Data and Computing - Facility Operations - How  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Computing Facility Operations Data and Computing Facility Operations In This Section: Getting Started Computing Environment Resources Setup Software Tutorials, Documentation, How Tos Mass Storage File Transfer Batch Systems CRAB Quota and Usage Statistics CERN Bluearc Quota and Stats System Status U.S. CMS Grid How to use SRM on the UAF Introduction Prerequisites Prepare your UAF account to use srmcp Transfering a file Monitoring SRM Gettin Help Introduction SRM (Storage Resource Management) is a grid-service available on the UAF. The srmcp command allows for file transfers between sites and mass storage systems. Here we will show examples to transfer files from CASTOR at CERN to Fermilab. Since it is a grid service there are two prerequisites: Prerequisites The whole procedure will probaly take a few days but you might want to

224

2Q CY2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2008 (PDF), Facility Representative Program Performance 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 87% Fully Qualifed ( last quarter was 85%) 86% Staffing Level ( last quarter was 88%)

225

Kansas State University DOE/KEURP Site Operator Program. Year 2, Second quarter report, October 1--December 31, 1992  

SciTech Connect

This concludes the sixth quarter that Kansas State University has been under contract to the US Department of Energy and the Kansas Electric Utility Research Program to demonstrate electric vehicle technology. The G-Van continues to perform within acceptable limits, although the batteries and the charger have caused some problems. Dave Harris, Chloride, has been working with K-State to correct these problems. It may very well be that the limited mileage (less than 25 miles) can be increased by extending the charge cycle (overcharging) the batteries. Soleq Corp. has failed to deliver contracted vehicles. A dual shaft electric propulsion minivan, built by Eaton Corp. in 1987, will be shipped here. On the infrastructure side, EHV Corp. is developing curbside and home charging stations.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.; Maier, M.A.

1992-12-31T23:59:59.000Z

226

Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility  

SciTech Connect

This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

JANIN, L.F.

2000-08-30T23:59:59.000Z

227

Engineering development of selective agglomeration: Task 6, Operation of the Component Development Test Facility  

SciTech Connect

The objective of this report is to summarize the component development and laboratory binder test work at Wilsonville during Task 6. This Task included the construction and startup of the Component Development Test Facility (CDTF), coal procurement, evaluation of unit operation and dewatering performance, laboratory binder tests for diesel and heptane, production characterization, and vendor tests. Data evaluation, interpretation, and analysis are not included in this report, but will be discussed in the Task 7 report.

Not Available

1991-09-01T23:59:59.000Z

228

Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility  

Science Conference Proceedings (OSTI)

The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

2011-07-25T23:59:59.000Z

229

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

Wick, Mike

2008-12-30T23:59:59.000Z

230

EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)  

SciTech Connect

The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.; Carper, Ross R.; Wiley, Julie G.; Beckman, Mary T.

2010-04-20T23:59:59.000Z

231

Operational characteristics of anaerobic digesters at selected municipal wastewater treatment facilities in the United States  

DOE Green Energy (OSTI)

Bench-scale and pilot plant studies at PNL have shown that powdered activated carbon is effective in improving volatile solids destruction and gas production in anaerobic digesters that are operating at less than normally expected levels of efficiency. To evaluate the applicability of this technology to digesters in the United States, digester operating characteristics at 60 facilities were surveyed and the number of stressed digesters estimated. The results show that although median values of the operating parameters conformed with those of a well-operated digester, 30% of the digesters surveyed were stressed with regard to at least one important parameter. Of the 30 largest treatment plants in the U.S., 7 fell into this category. Digester gas production and usage were then examined to determine the importance of methane off-gas as an energy source. A conservative estimate is that the gas produced nationally represents a heating value of about 2.36 x 10/sup 13/ Btu/year with a present value of $40 million. Of this amount, an estimated 75% is used either onsite or sold. Onsite uses include heating digesters and buildings, incinerating sludge, operating equipment, and generating electricity. The other 25% is flared and the energy value lost. The present value of the flared gas is about $10 million/year. Natural gas prices are projected to increase 150% over the next 7 years. If the present utilization ratio continues, the flared gas will be worth approximately $27 million in 1985. Presently, digester gas is mainly used for process heating and operating equipment. The technical and economic feasibility of recovering digester gas for electrical power generation, onsite equipment operation, and sales to other consumers (utilities, private companies) should be thoroughly investigated. If fuel gas recovery and utilization are found to be desirable, consideration should be given to expanding and upgrading anaerobic digester facilities in the U.S.

Spencer, R.R.; Wong, A.L.; Coates, J.A.; Ahlstrom, S.B.

1978-12-01T23:59:59.000Z

232

Strategic Petroleum Reserve quarterly report  

SciTech Connect

The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current storage capacity and ullage available; current status of the Strategic Petroleum Reserve storage facilities, major projects and the acquisition of petroleum products; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1995-11-15T23:59:59.000Z

233

Microsoft PowerPoint - quarterly_agenda.ppt [Read-Only]  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2007 7, 2007 Facility status: Jim Irby ICRF status: Earl Marmar (for Steve Wukitch) Cryopump status: Brian LaBombard LHRF status: Ron Parker Research campaign summary and plans: Steve Wolfe Alcator C-Mod Second Quarter FY07 DoE Review 1 DoE Quarterly Review 05/07/07 Facility Status and Plans 2 Status * Alcator C-Mod is currently in operation (details from Steve Wolfe) * Before operation began, major activities completed included - Upper divertor cryopump in-vessel installation - W-tile toroidal ring in outer divertor - Rotation of Long Pulse DNB (7 o toroidal) - Many diagnostic upgrades and several new installations 3 Updates: Operations Tile Module Installed tiles * W-Tile Belt Installed - Complete toroidal ring - 8 tungsten plates per module - ITER relevant activity 4 Updates: Operations

234

Analysis of 2011 Meteorological Data from the Knolls Atomic Power Laboratory and Kesselring Site Operations Facilities  

SciTech Connect

Both the Knolls Atomic Power Laboratory (KAPL) in Schenectady, NY and the Kesselring Site Operations (KSO) facility near Ballston Spa, NY are required to estimate the effects of hypothetical emissions of radiological material from their respective facilities by the US Environmental Protection Agency (EPA), which regulates these facilities. An atmospheric dispersion model known as CAP88, which was developed and approved by the EPA for such purposes, is used by KAPL and KSO to meet this requirement. CAP88 calculations over a given time period are based on statistical data on the meteorological conditions for that period. Both KAPL and KSO have on-site meteorological towers which take atmospheric measurements at a frequency ideal for EPA regulatory model input. However, an independent analysis and processing of the meteorological data from each tower is required to derive a data set appropriate for use in the CAP88 model. The National Atmospheric Release Advisory Center (NARAC) was contracted by KAPL to process the on-site data for the calendar year 2011. The purpose of this document is to: (1) summarize the procedures used in the preparation/analysis of the 2011 meteorological data; and (2) document adherence of these procedures to the guidance set forth in 'Meteorological Monitoring Guidance for Regulatory Modeling Applications', EPA document - EPA-454/R-99-005 (EPA-454). This document outlines the steps in analyzing and processing meteorological data from the Knolls Atomic Power Laboratory and Kesselring Site Operations facilities into a format that is compatible with the steady state dispersion model CAP88. This process is based on guidance from the EPA regarding the preparation of meteorological data for use in regulatory dispersion models. The analysis steps outlined in this document can be easily adapted to process data sets covering time period other than one year. The procedures will need to be modified should the guidance in EPA-454 be updated or revised.

Aluzzi, F J

2012-02-27T23:59:59.000Z

235

Confirmatory Survey Results for the Emergency Operations Facility (EOF) at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) requested that the Oak Ridge Institute for Science and Education (ORISE) perform a confirmatory survey on the Emergency Operations Facility (EOF) at the Connecticut Yankee Haddam Neck Plant (HNP) in Haddam, Connecticut

W. C. Adams

2007-07-03T23:59:59.000Z

236

EA-0995: Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to construct and operate a drum storage facility at the U.S. Department of Energy's Rocky Flats Environmental Technology Site in Golden,...

237

Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)  

SciTech Connect

The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.

COVEY, L.I.

2000-11-28T23:59:59.000Z

238

Operations Authorization Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Operations Authorization Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Controls established for safety are a discernible part of the plan for

239

Securing Operating Data From Passive Safety Tests at the Fast Flux Test Facility  

Science Conference Proceedings (OSTI)

The Fast Flux Test Facility (FFTF) is the most recent Liquid Metal Reactor (LMR) to operate in the United States, from 1982 to 1992. The technologies employed in designing and constructing this reactor, along with information obtained from tests conducted during its operation, are currently being secured and archived by the Department of Energys Office of Nuclear Energy Fuel Cycle Research and Development Program. This report is one in a series documenting the overall project efforts to retrieve and preserve critical information related to advanced reactors. A previous report summarized the initial efforts to review, retrieve and preserve the most salient documents related to Passive Safety Testing (PST) in the FFTF. Efforts continue to locate, secure, and retrieve record copies of original plant data tapes for the series of passive safety tests conducted between 1986 and 1991.

Wootan, David W.; Omberg, Ronald P.; Makenas, Bruce J.; Nielsen, Deborah L.; Nelson, Joseph V.; Polzin, David L.

2011-06-01T23:59:59.000Z

240

Securing Operating Data From Passive Safety Tests at the Fast Flux Test Facility  

SciTech Connect

The Fast Flux Test Facility (FFTF) is the most recent Liquid Metal Reactor (LMR) to operate in the United States, from 1982 to 1992. The technologies employed in designing and constructing this reactor, along with information obtained from tests conducted during its operation, are currently being secured and archived by the Department of Energy's Office of Nuclear Energy Fuel Cycle Research and Development Program. This report is one in a series documenting the overall project efforts to retrieve and preserve critical information related to advanced reactors. A previous report summarized the initial efforts to review, retrieve and preserve the most salient documents related to Passive Safety Testing (PST) in the FFTF. Efforts continue to locate, secure, and retrieve record copies of original plant data tapes for the series of passive safety tests conducted between 1986 and 1991.

Wootan, David W.; Omberg, Ronald P.; Makenas, Bruce J.; Nielsen, Deborah L.; Nelson, Joseph V.; Polzin, David L.

2011-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Energy-Smart Building Choices: How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money (Revision)  

SciTech Connect

Operating a typical school today is no easy task for facilities managers and business officials. You're expected to deliver increased services with constrained operating budgets. Many schools stay open for longer hours to accommodate community use of the facilities. Dilapidated buildings and systems gobble up energy, yet in many districts, maintenance needs are overshadowed by the need for expansion or new construction to serve growing student populations and changing educational needs.

Not Available

2002-02-01T23:59:59.000Z

242

Pilot Study for Quantifying LEED Energy & Atmosphere Operational Savings in Healthcare Facilities  

E-Print Network (OSTI)

Owner groups and Facility Managers of health care facilities interested in reducing operation and maintenance (O&M) expenses for new facilities have often been placed in the difficult position of making cost-benefit assessments without a complete understanding of the cumulative impact of building systems selection on their internal rate of return. This is particularly true when owners are evaluating the initial cost and operational benefit (if any) of obtaining various levels of "Leadership in Energy and Environmental Design" (LEED) certifications for their buildings. Heating Ventilation and Air Conditioning, and Lighting (HVAC&L) loads comprise 51% of the total energy demand in the typical outpatient facility; however, in order to estimate the likelihood of achieving a particular LEED rating for a new building, a "Whole Building Energy Simulation" is necessary to evaluate HVAC&L system performance. The conventional of requiring a design upon which to base an analysis presents owner operators attempting to perform a Lifecycle Cost Analysis (LCCA) early in the concept phase with two unique problems - how to estimate energy use without an actual "design" to model, and how to estimate a system's first cost without knowing its performance requirements. This study outlines a process by which existing energy metrics from the Department of Energy (DOE), Commercial Building Energy Consumption Survey (CBECS), and Energy Star, can be made early during the developer's pro forma phase - without the need for a building design. Furthermore, preliminary business decisions targeted at determining the likelihood of obtaining a particular LEED rating, and specifying the corresponding building systems, can be estimated without the cost required to employ an Architect and Engineer (A&E) team, or the time necessary to develop a design. This paper concludes that regional factors can dramatically affect a building's required level of energy performance, and that the highest performing HVAC&L system, irrespective of cost, will not always provide the best return on investment. Accordingly, the national averages utilized to establish LEED EA1 thresholds do not reflect the cost particularities owners may encounter when developing in various climate zones, and therefor may be less relevant to lifecycle considerations that previously believed.

Daniels, Patrick Rudolph

2012-08-01T23:59:59.000Z

243

Regional operations research program for development of geothermal energy in the Southwest United States. Second quarterly report  

DOE Green Energy (OSTI)

Continuation of efforts by the Core and State Teams in data acquisition, electric and non-electric economic studies, and development of computer support functions and operations is described.

Marlin, J.M.

1978-01-01T23:59:59.000Z

244

2Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2007 (PDF), Facility Representative Program Performance 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by field elements quarterly per DOE-STD-1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to impove the FR Program. A summary of this quarter's data concluded: 74% Fully Qualified 94% Staffing Level ( last quarter was

245

4Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2006 (PDF), Facility Representative Program Performance 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 72% Fully Qualified ( last Quarter was

246

Environmental assessment for the construction and operation of waste storage facilities at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky  

Science Conference Proceedings (OSTI)

DOE is proposing to construct and operate 3 waste storage facilities (one 42,000 ft{sup 2} waste storage facility for RCRA waste, one 42,000 ft{sup 2} waste storage facility for toxic waste (TSCA), and one 200,000 ft{sup 2} mixed (hazardous/radioactive) waste storage facility) at Paducah. This environmental assessment compares impacts of this proposed action with those of continuing present practices aof of using alternative locations. It is found that the construction, operation, and ultimate closure of the proposed waste storage facilities would not significantly affect the quality of the human environment within the meaning of NEPA; therefore an environmental impact statement is not required.

NONE

1994-06-01T23:59:59.000Z

247

Operational Radiation Protection in Synchrotron Light and Free Electron Laser Facilities  

Science Conference Proceedings (OSTI)

The 3rd generation synchrotron radiation (SR) facilities are storage ring based facilities with many insertion devices and photon beamlines, and have low injection beam power (radiation measurements, for SR facilities is also presented.

Liu, James C.; Rokni, Sayed H.; /SLAC; Vylet, Vaclav; /Jefferson Lab

2009-12-11T23:59:59.000Z

248

Regional operations research program for development of geothermal energy in the Southwest United States; third quarterly report  

DOE Green Energy (OSTI)

Continuation of efforts in data acquistion, electric and non-electric economic studies, development of computer support functions and operations, and preparation of geothermal development scenarios are described. Temperature data used in economic analysis and scenario development are given in an appendix as are the details of a revised economic model.

Marlin, J.M.

1978-04-01T23:59:59.000Z

249

Safety analysis--200 Area Savannah River Site: Separations Area operations Building 211-H Outside Facilities. Supplement 11, Revision 1  

Science Conference Proceedings (OSTI)

The H-Area Outside Facilities are located in the 200-H Separations Area and are comprised of a number of processes, utilities, and services that support the separations function. Included are enriched uranium loadout, bulk chemical storage, water handling, acid recovery, general purpose evaporation, and segregated solvent facilities. In addition, services for water, electricity, and steam are provided. This Safety Analysis Report (SAR) documents an analysis of the H-Area Outside Facilities and is one of a series of documents for the Separations Area as specified in the SR Implementation Plan for DOE order 5481.1A. The primary purpose of the analysis was to demonstrate that the facility can be operated without undue risk to onsite or offsite populations, to the environment, and to operating personnel. In this report, risks are defined as the expected frequencies of accidents, multiplied by the resulting radiological consequences in person-rem. Following the summary description of facility and operations is the site evaluation including the unique features of the H-Area Outside Facilities. The facility and process design are described in Chapter 3.0 and a description of operations and their impact is given in Chapter 4.0. The accident analysis in Chapter 5.0 is followed by a list of safety related structures and systems (Chapter 6.0) and a description of the Quality Assurance program (Chapter 7.0). The accident analysis in this report focuses on estimating the risk from accidents as a result of operation of the facilities. The operations were evaluated on the basis of three considerations: potential radiological hazards, potential chemical toxicity hazards, and potential conditions uniquely different from normal industrial practice.

Not Available

1993-01-01T23:59:59.000Z

250

Quarterly environmental, safety, and medical report: Second quarter, 1988  

SciTech Connect

ANG continued permitting activity during the reporting period. These activities include finalizing the revised RCRA Part B permit application; participating in the NDPDES QA/QC program; performing the required integrity tests on the deepwells; initiating a hydrogeologic assessment for the plant site; completing the DOE assigned sections for the modified permit to Construct/Operate application; preparing for the main stack CEM monitor certification test; completing the particle size distribution work on ''Donna'' coal lock vent; responding to NDSDH concerns about odor complaint followup surveys and lead in the drinking water supply; submitting a renewal application for the construction waste landfill; and requesting approval to dispose of spent shift catalyst in the gasifier ash pit. ANG conducted eight monitoring programs in the vicinity of the Great Plains facility. Major activities for these ambient monitoring programs are subsequently summarized. The RAMP network consists of five monitoring sites, and it is designed to monitor meteorology and air quality in the vicinity of the Great Plains facility and the Antelope Valley and Coyote electric generating stations. There was one exceedence of the air quality standards for TSP during the reporting period. ANG conducts ambient monitoring for H/sub 2/S at one site in the vicinity of the Great Plains facility. ANG conducts additional ambient monitoring for SO/sub 2/ at two (2) sites in order to ensure that ambient air quality standards are not violated during periods when H/sub 2/S- bearing wastes gases are incinerated in the event of temporary SRU shutdown. ANG conducts groundwater monitoring programs on a quarterly basis that are associated with desulfurization-gasifier ash waste disposal, deepwell injection, gasifier ash disposal, and the surge ponds. Major activities on each program are summarized.

1988-08-01T23:59:59.000Z

251

Kansas State University: DOE/KEURP Site Operator Program. Year 4, fourth quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect

Kansas State University, in support of a DOE and Kansas Electric Utilities Research Program subject contract, continues to test, evaluate, demonstrate, and develop electric vehicle and infrastructure technology. K-State is operating two Soleq EVcort vehicles. During this reporting period both vehicles were brought back to full operational status after warranty service was completed by Soleq. Vehicle failures occurred due to three unrelated battery cable failures in addition to the replacement of one battery. Both vehicles are being operated on a routine basis. K-State, along with York Technical College, has established a relationship with Troy Design and Manufacturing (TDM) Redford, Michigan. K-State has ordered no less than four Ford Ranger electric trucks from TDM. K-State is involved in the steering committee that is monitoring and refining information to direct the design and testing of these new technology vehicles. TDM should become the first automotive manufacturer certified by one of the Big Three under their Quality Vehicle Manufacturer program. Kansas State University and the Kansas Electric Utility Research Program look forward to working with TDM on their new EV program.

1995-08-01T23:59:59.000Z

252

Quarterly oil report: Third quarter, 1987. [CA  

Science Conference Proceedings (OSTI)

The volumes of petroleum fuels supplied to California in the fourth quarter of 1987 increased 1.6 percent from year ago levels. The increase is the result of increased unleaded gasoline and residual fuel oil use. Other fourth quarter results show that all product imports remained higher than year ago levels, but most were below the previous quarter except unleaded gasoline. Unleaded gasoline imports were higher, exports were reduced and stocks drawn down in the fourth quarter compared to the previous quarter to meet increased demand for unleaded fuel. Demand for low sulfur fuel oil increased toward the end of the quarter because natural gas sales to electric utilities were curtailed.

Not Available

1988-01-01T23:59:59.000Z

253

Recommended Changes to Guidelines for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility - For NRC Review  

Science Conference Proceedings (OSTI)

The majority of commercial U.S. nuclear stations have constructed on-site low-level waste (LLW) storage facilities, and most of these same utilities are experiencing or have experienced at least one period of interim on-site storage. EPRI has issued two revisions of Guidelines for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility. Revision 1 of these Guidelines focused on operational considerations and incorporated many of the lessons learned while operating various types of LLW s...

2011-12-19T23:59:59.000Z

254

NERSC 2011: High Performance Computing Facility Operational Assessment for the National Energy Research Scientific Computing Center  

E-Print Network (OSTI)

the Argonne and Oak Ridge Leadership Computing Facilitieslike Leadership Computing Facilities at Argonne and Oak

Antypas, Katie

2013-01-01T23:59:59.000Z

255

Kansas State University electric vehicle site operator program. Year 1, second quarter report, October 1, 1991--December 30, 1991  

DOE Green Energy (OSTI)

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State`s Site Operator Program continues to get the ``word-out`` about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State`s G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states`s program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State`s program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

256

Solar production of industrial process hot water: operation and evaluation of the Campbell Soup hot water solar facility. Final report, September 1, 1979-December 10, 1980  

DOE Green Energy (OSTI)

The operation and evaluation of a solar hot water facility designed by Acurex Corporation and installed (November 1977) at the Campbell Soup Company Sacramento, California canning plant is summarized. The period of evaluation was for 12 months from October 1979 through September 1980. The objective of the work was to obtain additional, long term data on the operation and performance of the facility. Minor modifications to the facility were completed. The system was operated for 15 months, and 12 months of detailed data were evaluated. The facility was available for operation 99% of the time during the last 8 months of evaluation. A detailed description of the solar facility and of the operating experience is given, and a summary of system performance for the 12 month operation/evaluation period is presented. Recommendations for large-scale solar facilities based on this project's experience are given, and an environmental impact assessment for the Campbell Soup solar facility is provided. (WHK)

Kull, J. I.; Niemeyer, W. N.; Youngblood, S. B.

1980-12-01T23:59:59.000Z

257

Valves - current operating experience of slurry valves (block and letdown) in coal liquefaction processes. Third quarter report  

Science Conference Proceedings (OSTI)

This paper summarizes the recent letdown and block valve experience in the liquefaction pilot plants. Also included is a brief description of the research and development activities on valves which are conducted in supporting laboratories. The purpose of the summary is to concentrate on critical component problems common to all liquefaction plants, to avoid duplication of efforts, and to help provide timely solutions to the valve problems. The main source of information used in this paper is the Minutes of the Critical Component and Materials Meeting which is sponsored by the Office of Coal Processing, Fossil Energy, Department of Energy. Other sources of information such as the technical progress reports are also included based on availability and relevance to topics covered in this paper. It is intended that this report will be followed by updates as pertinent information concerning valves becomes available. In the subsequent sections of this paper a brief outline of past valve studies is given as background material followed by a summary of the most recent valve operating experience at the liquefaction plants.

NONE

1996-07-01T23:59:59.000Z

258

Kansas State University Electric Vehicle Site Operator Program. Year 1: First quarter report, July 2, 1991--September 30, 1991  

SciTech Connect

During the past fifteen years Kansas State`s faculty has been involved in research of alternative fuel vehicles. From formulation of fuels and automotive fuel storage to development of electronic controls, K-State`s faculty research has been ongoing. With the increased awareness of what is occurring to the world`s environment, the catalyst -- to ensure applied results from faculty research will occur -- has been activated. The Department of Energy`s Electric Vehicle Site Operator Program is the platform being used to demonstrate international efforts to bring a more acceptable daily mode of transportation to our highways. The first new electrical vehicle procured at K-State in the last ten years, a G-Van, is a technological dinosaur. It does not incorporate leading edge control or drive systems nor does it provide the type of vehicle frame and body to meet a majority of the daily commuter needs required by the American market. Yet, this vehicle represents initial efforts to bring a federally crash certified vehicle to the commercial automotive market. As such, it is an evolutionary step in the mass production of electric vehicle products.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

259

Kansas State University DOE/KEURP Site Operator Program. Year 3, Third quarter report, January 1, 1994--March 31, 1994  

Science Conference Proceedings (OSTI)

Formed on July 15, 1981, the goal of this program is to undertake applied research and development projects that may enhance reliability and minimize the cost of electric service in Kansas. The Kansas Electric Utilities Research Program (KEURP) is a contractual joint venture between six major electric utilities that serve the residents of the State of Kansas. The establishment of KEURP was made possible by the Kansas Corporation Commission (KCC). The KCC allowed Kansas electric utilities to include research and development (R & D) costs in their operating expenses, including dues to the Electric Power Research Institute (EPRI). Kansas universities play a unique role in KEURP with representation on the executive, technical and advisory committees of the program. The universities receive significant direct and indirect support from KEURP through direct funded projects as well as KEURP/EPRI co-funded projects. KEURP is working with EPRI researchers on projects to develop or expand Kansans knowledge and expertise in the fields of high technology and economic development. KEURP is a major source of funding in the electric/hybrid vehicle demonstration program.

Hague, J.R.

1994-05-01T23:59:59.000Z

260

Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D&D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D&D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS.

NONE

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Northeast regional biomass program. First quarter report, October--December 1993  

DOE Green Energy (OSTI)

This progress report presents summaries of various projects which were in operation or being planned during this quarter period. Projects included testing the efficiency of using wood chips as fuel in heating systems, barriers to commercial development of wood pellet fuels, studies of more efficient and less polluting wood stoves, work on landfill gas utilization, directories of facilities using biomass fuels, surveys of biomass conversion processes to liquid fuels, for commercial development, etc.

NONE

1994-05-01T23:59:59.000Z

262

Resolving issues at the Department of Energy/Oak Ridge Operations Facilities  

SciTech Connect

Waste management, like many other issues, has experienced major milestones. In 1971, the Calvert Cliff's decision resulted in an entirely different approach to the consideration of environmental impact analysis in reactor siting. The accidents at Three Mile Island and Chernobyl have had profound effects on nuclear power plant design. The high-level waste repository program has had many similar experiences that have modified the course of events. The management of radioactive, hazardous chemical and mixed waste in all of the facilities of the Oak Ridge Operations (ORO) Office of the Department of Energy (DOE) took on an entirely different meaning in 1984. On April 13, 1984, Federal Judge Robert Taylor said that DOE should proceed 'with all deliberate speed' to bring the Y-12 plant into compliance with the Resource Conservation and Recovery Act and the Clean Water Act. This decision resulted from a suit brought by the Legal Environmental Assistance Foundation (LEAF) and grew out of a continuing revelation of mercury spills and other problems related to the Oak Ridge plants of DOE. In this same time frame, other events occurred in Oak Ridge that would set the stage for major changes, to provide the supporting environment that allowed a very different and successful approach to resolving waste management issues at the DOE/ORO Facilities. This is the origin of the Oak Ridge Model which was recently adopted as the DOE Model. The concept is to assure that all stakeholders in waste management decisions have the opportunity to be participants from the first step. A discussion of many of the elements that have contributed to the success of the Model follows.

Row, T.H.; Adams, W.D.

1988-01-01T23:59:59.000Z

263

Resolving issues at the Department of Energy/Oak Ridge Operations Facilities  

SciTech Connect

Waste management, like many other issues, has experienced major milestones. In 1971, the Calvert Cliff's decision resulted in an entirely different approach to the consideration of environmental impact analysis in reactor siting. The accidents at Three Mile Island and Chernobyl have had profound effects on nuclear power plant design. The high-level waste repository program has had many similar experiences that have modified the course of events. The management of radioactive, hazardous chemical and mixed waste in all of the facilities of the Oak Ridge Operations (ORO) Office of the Department of Energy (DOE) took on an entirely different meaning in 1984. On April 13, 1984, Federal Judge Robert Taylor said that DOE should proceed 'with all deliberate speed' to bring the Y-12 plant into compliance with the Resource Conservation and Recovery Act and the Clean Water Act. This decision resulted from a suit brought by the Legal Environmental Assistance Foundation (LEAF) and grew out of a continuing revelation of mercury spills and other problems related to the Oak Ridge plants of DOE. In this same time frame, other events occurred in Oak Ridge that would set the stage for major changes, to provide the supporting environment that allowed a very different and successful approach to resolving waste management issues at the DOE/ORO Facilities. This is the origin of the Oak Ridge Model which was recently adopted as the DOE Model. The concept is to assure that all stakeholders in waste management decisions have the opportunity to be participants from the first step. A discussion of many of the elements that have contributed to the success of the Model follows.

Row, T.H.; Adams, W.D.

1988-01-01T23:59:59.000Z

264

Design and operation of a counter-rotating aspirated compressor blowdown test facility  

E-Print Network (OSTI)

A unique counter-rotating aspirated compressor was tested in a blowdown facility at the Gas Turbine Laboratory at MIT. The facility expanded on experience from previous blowdown turbine and blowdown compressor experiments. ...

Parker, David V. (David Vickery)

2005-01-01T23:59:59.000Z

265

Strategic Petroleum Reserve: Annual/quarterly report  

SciTech Connect

Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

1994-02-16T23:59:59.000Z

266

Domestic Uranium Production Report - Quarterly - Energy Information  

U.S. Energy Information Administration (EIA) Indexed Site

All Nuclear Reports All Nuclear Reports Domestic Uranium Production Report - Quarterly Data for 3rd Quarter 2013 | Release Date: October 31, 2013 | Next Release Date: February 2014 | full report Previous Issues Year: 2013-Q2 2013-Q1 2012-Q4 2012-Q3 2012-Q2 2012-Q1 2011-Q4 2011-Q3 2011-Q2 2011-Q1 2010-Q4 2010-Q3 2010-Q2 2010-Q1 2009-Q4 2009-Q3 2009-Q2 2009-Q1 2008-Q4 2008-Q3 2008-Q2 2008-Q1 Go 3rd Quarter 2013 U.S. production of uranium concentrate in the third quarter 2013 was 1,171,278 pounds U3O8, down 16 percent from the previous quarter and up 12 percent from the third quarter 2012. Third quarter 2013 uranium production is at its highest level since 1999. During the third quarter 2013, U.S. uranium was produced at six U.S. uranium facilities. U.S. Uranium Mill in Production (State)

267

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman August 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

268

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman June 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

269

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

0 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman May 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

270

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PADUCAH, KENTUCKY, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Paducah DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

271

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PORTSMOUTH, OHIO, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Portsmouth DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

272

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Paducah DUF 6 DEIS: December 2003 SUMMARY S.1 INTRODUCTION This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the Federal Register (FR) on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth,

273

Third and Fourth Quarter Financial Guidance | National Nuclear...  

National Nuclear Security Administration (NNSA)

Financial Guidance Home > About Us > Our Operations > Acquisition and Project Management > Office of Financial Field Management > Third and Fourth Quarter Financial Guidance...

274

3Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2006 (PDF), Facility Representative Program Performance 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 76% fully qualified 41% staffing level

275

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities groundwater monitoring and corrective-action report (U). Third and fourth quarters 1996, Vol. I  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River Site (SRS) during 1996.

NONE

1997-03-01T23:59:59.000Z

276

NERSC 2011: High Performance Computing Facility Operational Assessment for the National Energy Research Scientific Computing Center  

E-Print Network (OSTI)

NERSC 2011 High Performance Computing Facility Operationalby providing high-performance computing, information, data,s deep knowledge of high performance computing to overcome

Antypas, Katie

2013-01-01T23:59:59.000Z

277

DOE/SC-ARM-12-006 ARM Climate Research Facility Radar Operations...  

NLE Websites -- All DOE Office Websites (Extended Search)

Database CM&PM Corrective Maintenance & Preventative Maintenance Database DMF Data Management Facility (ARM) DQ data quality DQO Data Quality Office (ARM) DQPR Data Quality...

278

NERSC 2011: High Performance Computing Facility Operational Assessment for the National Energy Research Scientific Computing Center  

E-Print Network (OSTI)

utilizes a separate link to ESnet to provide data-rich largecontinues to partner with ESnet in providing quality networksignificant collaboration with ESnet and other facility

Antypas, Katie

2013-01-01T23:59:59.000Z

279

Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Checklists and work instructions  

SciTech Connect

This is volume two of the ORNL old hydrofracture facility tanks contents removal action operations plan. This volume contains checklists and work instructions.

1998-05-01T23:59:59.000Z

280

Contract status report for MHD research and development and operation of the MHD Coal Fired Flow Facility for the month ending June 30, 1995  

DOE Green Energy (OSTI)

This report contains the operations schedule for the month of June 1995 at the University of Tennessee Space Institute`s Coal Fired MHD Flow Facility.

NONE

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Contract status report for MHD research and development and operation of the MHD Coal Fired Flow Facility for the month ending May 31, 1995  

DOE Green Energy (OSTI)

This report contains the operations schedule for the month of May 1995 at the University of Tennessee Space Institute`s Coal Fired MHD Flow Facility.

NONE

1995-08-01T23:59:59.000Z

282

A historical perspective of remote operations and robotics in nuclear facilities. Robotics and Intelligent Systems Program  

SciTech Connect

The field of remote technology is continuing to evolve to support man`s efforts to perform tasks in hostile environments. The technology which we recognize today as remote technology has evolved over the last 45 years to support human operations in hostile environments such as nuclear fission and fusion, space, underwater, hazardous chemical, and hazardous manufacturing. The four major categories of approach to remote technology have been (1) protective clothing and equipment for direct human entry, (2) extended reach tools using distance for safety, (3) telemanipulators with barriers for safety, and (4) teleoperators incorporating mobility with distance and/or barriers for safety. The government and commercial nuclear industry has driven the development of the majority of the actual teleoperator hardware available today. This hardware has been developed largely due to the unsatisfactory performance of the protective-clothing approach in many hostile applications. Manipulation systems which have been developed include crane/impact wrench systems, unilateral power manipulators, mechanical master/slaves, and servomanipulators. Viewing systems have included periscopes, shield windows, and television systems. Experience over the past 45 years indicates that maintenance system flexibility is essential to typical repair tasks because they are usually not repetitive, structured, or planned. Fully remote design (manipulation, task provisions, remote tooling, and facility synergy) is essential to work task efficiency. Work for space applications has been primarily research oriented with relatively few successful space applications, although the shuttle`s remote manipulator system has been quite successful. In the last decade, underwater applications have moved forward significantly, with the offshore oil industry and military applications providing the primary impetus.

Herndon, J.N.

1992-12-31T23:59:59.000Z

283

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 Capacity (short tons of ore per day) 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 EFR White Mesa LLC White Mesa Mill San Juan, Utah 2,000 Operating Operating Operating Operating-Processing Alternate Feed Energy Fuels Resources Corporation Piñon Ridge Mill Montrose, Colorado 500 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Permitted And Licensed Energy Fuels Wyoming Inc Sheep Mountain Fremont, Wyoming 725 - Undeveloped Undeveloped Undeveloped Kennecott Uranium Company/Wyoming Coal Resource Company Sweetwater Uranium Project Sweetwater, Wyoming 3,000

284

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site  

DOE Green Energy (OSTI)

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Portsmouth site in Ohio (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Portsmouth to a more stable chemical form suitable for use or disposal. The facility would also convert the DUF{sub 6} from the East Tennessee Technology Park (ETTP) site near Oak Ridge, Tennessee. In a Notice of Intent (NOI) published in the Federal Register on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (United States Code, Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (Code of Federal Regulations, Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a Federal Register Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Portsmouth site; from the transportation of all ETTP cylinders (DUF{sub 6}, low-enriched UF6 [LEU-UF{sub 6}], and empty) to Portsmouth; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). An option of shipping the ETTP cylinders to Paducah is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Portsmouth and ETTP sites. A separate EIS (DOE/EIS-0359) evaluates potential environmental impacts for the proposed Paducah conversion facility.

N /A

2003-11-28T23:59:59.000Z

285

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

L. O. Nelson

2003-09-01T23:59:59.000Z

286

CFN Operations and Safety Awareness (COSA) Checklist Soft-Bio Nanomaterials Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Soft-Bio Nanomaterials Facility Soft-Bio Nanomaterials Facility Building 735 This COSA form must be completed for all experimenters working in the CFN and must be submitted to the CFN User Office for badge access. CFN Safety Awareness Policy: Each user must be instructed in the safe procedures in CFN related activities. CFN Facility Laboratory personnel shall keep readily available all relevant instructions and safety literature. Employee/Guest Name Life/Guest Number Department/Division ES&H Coordinator/Ext. Facility Manager COSA Trainer Guest User Staff USER ADMINISTRATION Checked in at User Administration and has valid BNL ID badge Safety Approval Form (SAF) approved. Training requirements completed (Indicate additional training specified in SAF or ESR in lines provided below):

287

CFN Operations and Safety Awareness (COSA) Checklist Nanofabrication (Clean Room) Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanofabrication (Clean Room) Facility Nanofabrication (Clean Room) Facility Building 735 This COSA form must be completed for all experimenters working in the CFN and must be submitted to the CFN User Office for badge access. CFN Safety Awareness Policy: Each user must be instructed in the safe procedures in CFN related activities. CFN Facility Laboratory personnel shall keep readily available all relevant instructions and safety literature. Employee/Guest Name Life/Guest Number Department/Division ES&H Coordinator/Ext. Facility Manager COSA Trainer Guest User Staff USER ADMINISTRATION Checked in at User Administration and has valid BNL ID badge Safety Approval Form (SAF) approved. Training requirements completed (Indicate additional training specified in SAF or ESR in lines provided below):

288

SuperHILAC: Heavy-ion linear accelerator: Summary of capabilities, facilities, operations, and research  

Science Conference Proceedings (OSTI)

This report consists of a description of the accelerator facilities and a review of research programs being conducted there. Lists of SuperHILAC researchers and publications are also given.

McDonald, R.J. (ed.)

1987-09-01T23:59:59.000Z

289

Operation of the Wilsonville Advanced Coal Liquefaction R&D Facility, 1981  

Science Conference Proceedings (OSTI)

The addition of a hydrotreater launched the development of two-stage liquefaction at the Wilsonville test facility. This and other research undertaken during 1981 accelerated progress toward the production of high-quality, economical coal-derived liquid fuels.

1984-08-01T23:59:59.000Z

290

The national ignition facility: early operational experience with a large Ada control system  

Science Conference Proceedings (OSTI)

The National Ignition Facility (NIF) currently under construction at the University of California Lawrence Livermore National Laboratory (LLNL) is a 192-beam, 1.8-Megajoule, 500-Terawatt laser being built by the Department of Energy and the National ...

Robert W. Carey; Paul J. Van Arsdall; John P. Woodruff

2002-12-01T23:59:59.000Z

291

U.S. CMS - U.S. CMS @ Work - Data and Computing - Facility Operations...  

NLE Websites -- All DOE Office Websites (Extended Search)

File Transfer Batch Systems CRAB Quota and Usage Statistics CERN Bluearc Quota and Stats System Status U.S. CMS Grid Quota Policy and Usage Statistics Tier 1 Facility provides...

292

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

DOE Green Energy (OSTI)

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). Although not part of the proposed action, an option of shipping all cylinders (DUF{sub 6}, low-enriched UF{sub 6} [LEU-UF{sub 6}], and empty) stored at the East Tennessee Technology Park (ETTP) near Oak Ridge, Tennessee, to Paducah rather than to Portsmouth is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Paducah site. A separate EIS (DOE/EIS-0360) evaluates the potential environmental impacts for the proposed Portsmouth conversion facility.

N /A

2003-11-28T23:59:59.000Z

293

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1998 1 March 1998 1 continued on page 2 For First Quarter FY 1998 March 2, 1998, Issue No. 14 National Environmental Policy Act N E P A LESSONS LEARNED LESSONS LEARNED U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Managing Progress on the Repository EIS How to Move a Mountain Tour members approach the entry to the Yucca Mountain Exploratory Studies Facility. The EIS Management Council, along with members and technical advisors of the EIS Preparation Team, visited the site in January while participating in briefings on technical, legal, and policy issues. How do you manage preparation of a major EIS that is important to five Program Offices, four Field Offices, and other Federal agencies, not to mention a wide array of stakeholders? How do you address extremely complex and

294

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1999 June 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 1999 June 1, 1999; Issue No. 19 continued on page 6 NEPA and Habitat Management Plan: Environmental Synergy By: Elizabeth Withers, NEPA Compliance Officer, Los Alamos Area Office, with John Stetson, Pacific Western Technologies, Ltd. On the day DOE issued the Draft EIS for the Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility at Los Alamos National Laboratory (LANL), LANL biologists discovered a nesting pair of Mexican spotted owls (Strix occidentalis lucida) – which had only recently been listed as threatened – in the canyons directly below the proposed site. Today, this nest site, at the edge

295

Microsoft PowerPoint - doe_110106_quarterly.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Status and Plans Facility Status and Plans DoE Quarterly Review Cryopump Prototype 2 Status * Alcator C-Mod is currently up-to-air * A very successful alternator inspection has been completed - Extensive set of hi-pots, resistance checks, polarization index measurements, and visual inspections - Alternator could be operational on short notice * Before next run campaign we are working to complete - Upper divertor cryopump installation - W-tile toroidal ring in outer divertor - Fast ferrite real-time tuner system for the E-Port antenna - Rotation of Long Pulse DNB (7 o toroidal) - New diagnostics and improvements to many existing ones * We are also - Upgrading lower hybrid control and protection system - Developing a new set of lower hybrid stainless steel couplers 3 Updates * Cryopump - Very successful testing of prototype completed

296

Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1988 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1988.

Lofy, Peter T.

1989-12-01T23:59:59.000Z

297

Operation, Maintenance, and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1987 Annual Report.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1987.

Lofy, Peter T.

1988-12-01T23:59:59.000Z

298

3Q/4Q99 F-Area Hazardous Waste Management Facility Corrective Action Report - Third and Fourth Quarter 1999, Volumes I and II  

Science Conference Proceedings (OSTI)

Savannah River Site (SRS) monitors groundwater quality at the F-Area Hazardous Waste management Facility (HWMF) and provides results of this monitoring to the South Carolina Department of Health and Environmental Control (SCDHEC) semiannually as required by the Resource Conservation and Recovery Act (RCRA) permit. SRS also performs monthly sampling of the Wastewater Treatment Unit (WTU) effluent in accordance with Section C of the Underground Injection Control (UIC) application.

Chase, J.

2000-05-12T23:59:59.000Z

299

US energy industry financial developments, 1993 third quarter  

SciTech Connect

Based on information provided in 1993 third quarter financial disclosures, the average net income for 112 petroleum companies -- including 18 majors -- rose 13 percent between the third quarter of 1992 and the third quarter of 1993. The gain in overall petroleum income was derived from increases in refined product consumption and margins, which improved the profitability of downstream petroleum (refining, marketing and transport) operations. A 17-percent decline in crude oil prices led to reduced income for upstream (oil and gas exploration, development and production) operations. A 16-percent rise in natural gas wellhead prices only partially offset the negative effects of low crude oil prices. Electric utilities also reported improved financial results for the third quarter of 1993 as hotter summer temperatures relative to the year-earlier quarter helped boost air conditioning demand and overall electricity usage. The following points highlight third-quarter energy industry financial developments: (1) Refined product demand and margins lift downstream earnings. Petroleum product consumption rose 2 percent between the third quarter of 1992 and the third quarter of 1993. Although petroleum product prices declined in the most recent reporting period, they did not decline as much as crude oil input prices. As a consequence, refined product margins widened. (2) Lower crude oil prices reduce upstream earnings. Crude oil prices fell 17 percent between the third quarter of 1992 and the third quarter of 1993 leading to a substantial reduction in income for the major petroleum companies` upstream operations. (3) Drilling income rises with increased North American exploratory activity.

Not Available

1993-12-01T23:59:59.000Z

300

ASCeNews - Quarterly Newsletter  

National Nuclear Security Administration (NNSA)

December 2010 - NA-ASC-500-10 - Issue 15 December 2010 - NA-ASC-500-10 - Issue 15 1 ASCeNews - Quarterly Newsletter December 2010 - NA-ASC-500-10 - Issue 15 Meisner Minute I hope this quarter's newsletter finds you and your families looking forward to a healthy and prosperous new year. And, professionally, I hope your achievements in the New Year exceed those of a very successful 2010. In spite of presenting you with impediments such as continuing resolutions, your accomplishments are nothing short of amazing. So, I would like to take the time to recount your successes as a challenge for the New Year. This past year culminated several years of hard work on the Energy Balance knob. For the first time brilliant minds, unprecedented experimental facilities and world-leading simulation capabilities converged at a point in

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

An Operator Perspective from a Facility Evaluation of an RFID-Based UF6 Cylinder Accounting and Tracking System  

SciTech Connect

An operational field test of a Radio-Frequency Identification (RFID) system for tracking and accounting UF6 cylinders was conducted at the Global Nuclear Fuel Americas (GNF) fuel fabrication plant in 2009. The Cylinder Accountability and Tracking System (CATS) was designed and deployed by Oak Ridge National Laboratory (ORNL) and evaluated in cooperation with GNF. The system required that passive RFID be attached to several UF6 30B cylinders as they were received at the site; then the cylinders were tracked as they proceeded to interim storage, to processing in an autoclave, and eventually to disposition from the site. This CATS deployment also provided a direct integration of scale data from the site accountability scales. The integration of this information into the tracking data provided an attribute for additional safeguards for evaluation. The field test provided insight into the advantages and challenges of using RFID at an operating nuclear facility. The RFID system allowed operators to interact with the technology and demonstrated the survivability of the tags and reader equipment in the process environment. This paper will provide the operator perspective on utilizing RFID technology for locating cylinders within the facility, thereby tracking the cylinders for process and for Material Control & Accounting functions. The paper also will present the operator viewpoint on RFID implemented as an independent safeguards system.

Martyn, Rose [Global Nuclear Fuels; Fitzgerald, Peter [Global Nuclear Fuels; Stehle, Nicholas D [ORNL; Rowe, Nathan C [ORNL; Younkin, James R [ORNL

2011-01-01T23:59:59.000Z

302

Operational Philosophy for the Advanced Test Reactor National Scientific User Facility  

SciTech Connect

In 2007, the Department of Energy (DOE) designated the Advanced Test Reactor (ATR) as a National Scientific User Facility (NSUF). At its core, the ATR NSUF Program combines access to a portion of the available ATR radiation capability, the associated required examination and analysis facilities at the Idaho National Laboratory (INL), and INL staff expertise with novel ideas provided by external contributors (universities, laboratories, and industry). These collaborations define the cutting edge of nuclear technology research in high-temperature and radiation environments, contribute to improved industry performance of current and future light-water reactors (LWRs), and stimulate cooperative research between user groups conducting basic and applied research. To make possible the broadest access to key national capability, the ATR NSUF formed a partnership program that also makes available access to critical facilities outside of the INL. Finally, the ATR NSUF has established a sample library that allows access to pre-irradiated samples as needed by national research teams.

J. Benson; J. Cole; J. Jackson; F. Marshall; D. Ogden; J. Rempe; M. C. Thelen

2013-02-01T23:59:59.000Z

303

Operator Training Facility at Oncor Utilizing On-Line Training and Instructor User Manuals  

Science Conference Proceedings (OSTI)

This report describes a training program for utility transmission, generation, and distribution operators. The program developed an on-line user's guide to Oncor's Transmission Management System (TMS) and an instructor's guide for its Operator Training Simulator (OTS).

2002-12-06T23:59:59.000Z

304

Design and operation of a counter-rotating aspirated compressor blowdown test facility; Counter-rotating aspirated compressor blowdown test facility.  

E-Print Network (OSTI)

??A unique counter-rotating aspirated compressor was tested in a blowdown facility at the Gas Turbine Laboratory at MIT. The facility expanded on experience from previous (more)

Parker, David V. (David Vickery)

2005-01-01T23:59:59.000Z

305

Flow Measurement at Hydro Facilities: Achieving Efficiency, Compliance, and Optimal Operation (TR-113584-V5)  

Science Conference Proceedings (OSTI)

Many factors can affect the performance and profitability of hydro facilities. The basis of hydroelectric power production is founded on the quantity, availability, and effective use of water. The premise of this Hydropower Technology Roundup report is that an improvement in flow measurement techniques and applications will improve hydroelectric production.

2002-01-15T23:59:59.000Z

306

Facility Representative Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Facility Representative Office of Nuclear Safety Home Facility Representative Home Annual Facility Rep Workshop › 2012 › 2011 › 2010 › 2009 › 2008 › 2007 › 2006 › 2005 › 2004 › 2003 › 2002 › 2001 › 2000 DOE Safety Links › ORPS Info › Operating Experience › DOE Lessons Learned › Accident Investigation Assessment Tools › FR CRADs › Surveillance Guides › Manager's Guide for Safety and Health Subject Matter Links General Program Information › Program Mission Statement › Program Directives and Guidance › FR of the Year Award Program › FR of the Year Award › FR Program Assessment Guide (Appendix B, DOE STD 1063-2011) FR Quarterly Performance Indicators Training & Qualification Information › Qualification Standards › Energy Online Courses

307

4Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2007 (PDF), Facility Representative Program Performance 4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2007. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 83% Fully Qualified (last Quarter was 82%) 85% Staffing Level (last Quarter was 93%) 45% Time Spent in the Field (DOE goal is >40%) 73% Time Spent in Oversight Activities (DOE Goal is> 65%)"

308

2Q CY2009 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2009 (PDF), Facility Representative Program Performance 2Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2009. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 77% Fully Qualified (last quarter was 78%) 90% Staffing Level ( last Quarter was 90%); 45% Time Spent in the Field (DOE goal is>40%); and 73% Time Spent in Oversight Activites (DOE Goal is > 65%)"

309

1Q CY2009 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2009 (PDF), Facility Representative Program Performance 1Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2009 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2009. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 78% Fully Qualified ( last Quarter was 76%) 90% Staffing Level ( last Quarter was 89%) 47% Time Spent in the Field (DOE goal is>40%) 74% Time Spent in Oversight Activites (DOE Goal is>65%)"

310

4Q CY2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2008 (PDF), Facility Representative Program Performance 4Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 76% Fully Qualified ( last Quarter was 80%) 89% Staffing Level (last Quarter was 89%) 44% Time Spent in the Field ( Department of Energy)(DOE) goal is > 40%) 73% Time Spent in Oversight Activites (DOE Goal is> 65%)"

311

2Q CY2002 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2002 (PDF), Facility Representative Program Performance 2Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from April to June 2002. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standards , DOE-STD-1063-2000, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definition of the PIs from the Standard are also attached for your use in evaluating the data. Overall, the percentage of fully qualified Facility Representatives increased to 80% last quarter, from 78% the previous quarter , and

312

Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado  

SciTech Connect

The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1996-06-01T23:59:59.000Z

313

Operation, modification, and maintenance of DOE/PETC 700 H. P. combustion test facility. Yearly activity report, April 3, 1978--April 1, 1979  

SciTech Connect

The operation, modifications and maintenance of the DOE/PETC 700 H.P. combustion test facility are described. Shakedown and operation limit tests were performed with No. 6 fuel oil and 30% COM. The tests involved flame studies, erosion, corrosion and the examination of boiler deposits. Various construction, modification and maintenance efforts are detailed. The original 100 H.P. test facility was scrapped after 3 months operation under this contract and construction of a new 100-20 H.P. test facility begun. (LTN)

1978-01-01T23:59:59.000Z

314

U. S. Department of Energy Savannah River Operations Office - Saltstone  

NLE Websites -- All DOE Office Websites (Extended Search)

Saltstone Permit Reports Saltstone Permit Reports Saltstone Permit Reports SRS Saltstone Disposal Facility Performance Assessment External Link Saltstone Permit Report Website User's Guide Adobe Acrobat PDF Saltstone Permit Reporting Data -- Third Quarter 2013 Adobe Acrobat PDF Saltstone Permit Reporting Data -- Second Quarter 2013 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- First Quarter 2013 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- Fourth Quarter 2012 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- Third Quarter 2012 (1) Adobe Acrobat PDF Saltstone Permit Reporting Data -- Second Quarter 2012 Adobe Acrobat PDF Saltstone Permit Reporting Data -- First Quarter 2012 Adobe Acrobat PDF Saltstone Permit Reporting Data -- Fourth Quarter 2011 (1) Adobe Acrobat PDF

315

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

1991-08-15T23:59:59.000Z

316

Machine Shop Safe Operations Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2003 - Machine Shop Safe Operations July 2003 - Machine Shop Safe Operations Utilize 29 CFR 1910 Utilize applicable LLNL, LANL, DTRA, BN procedures VALUE ADDED FOR: AMTS Contractor Assurance Focus Area AMTS ISM Improvements Focus Area AMTS Safety Precursors/Hazards Analysis Focus Area AMTS Environment, Safety, & Health Division MACHINE SHOP SAFE OPERATIONS Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is to verify that machine shop operators are provided a safe and healthful workplace which will reduce or prevent injuries, illnesses, and accidental losses. Criteria: A worker protection program shall be implemented that provides a place of employment free from recognized hazards that are causing or likely to cause

317

Improving information flow for molding maintenance operations in a medical device manufacturing facility  

E-Print Network (OSTI)

Manufacturing companies seek ways to eliminate waste from their operations to stay competitive. In this project, the waste is in the mold repair process which involves two main groups, Molding and Tooling. By using process ...

Lin, YongLiang Manfred

2009-01-01T23:59:59.000Z

318

Implementation plan for the Waste Experimental Reduction Facility Restart Operational Readiness Review  

SciTech Connect

The primary technical objective for the WERF Restart Project is to assess, upgrade where necessary, and implement management, documentation, safety, and operation control systems that enable the resumption and continued operation of waste treatment and storage operations in a manner that is compliant with all environment, safety, and quality requirements of the US Department of Energy and Federal and State regulatory agencies. Specific processes that will be resumed at WERF include compaction of low-level compatible waste; size reduction of LLW, metallic and wood waste; incineration of combustible LLW and MLLW; and solidification of low-level and mixed low-level incinerator bottom ash, baghouse fly ash, and compatible sludges and debris. WERF will also provide for the operation of the WWSB which includes storage of MLLW in accordance with Resource Conservation and Recovery Act requirements.

Not Available

1993-03-01T23:59:59.000Z

319

A study of the Mighty Motors operating system : making sustainable improvements at a powertrain manufacturing facility  

E-Print Network (OSTI)

Many manufacturing companies are developing their own production or operating system, particularly in an effort to duplicate the widely renowned Toyota Production System. Toyota has demonstrated its potential for improving ...

Dibb, Gregory David, 1974-

2004-01-01T23:59:59.000Z

320

3Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2003 (PDF), Facility Representative Program Performance 3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from July to September 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. 3Q CY2003, Facility Representative Program Performance Indicators More Documents & Publications 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2005 (PDF), Facility Representative Program Performance Indicators

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Identification and Evaluation of Fluvial-Dominated Deltaic Reservoirs. Quarterly technical report, April 1 -June 30, 1997  

Science Conference Proceedings (OSTI)

This document is provided as a Quarterly Technical Progress Report for the program entitled `Identification and Evaluation of Fluvial- Dominated Deltaic (Class 1 Oil) Reservoirs in Oklahoma`, covering the reporting period of April 1 - June 30, 1997. Work is progressing as expected for the project. The FDD computer facility is fully operational. During this quarter, there were 27 industry individuals who used the facility. The Tonkawa Play workshop is scheduled for July 9, 1997 in Norman. The Tonkawa publication and presentation graphics are nearly completed. The Bartlesville workshop is scheduled for October and November, 1997, in three different sites. Text and illustrations for that play are in progress. This project is serving an extremely valuable role in the technology transfer activities for the Oklahoma petroleum industry, with very positive industry feedback.

Banken, M.K.; Andrews, R.

1997-09-12T23:59:59.000Z

322

NEPA Lessons Learned Quarterly Report - 1st Quarter FY2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2000 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 2000 March 1, 2000; Issue No. 22 Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources continued on page 4 By: Thomas W. Ferns, NEPA Document Manager, Richland Operations Office, and Yardena Mansoor, Office of NEPA Policy and Assistance A 50-year land-use plan for the Hanford Site? Some said it couldn't be done. Too many factions, they said, with irreconcilably different visions for the future. Would NEPA be a help or a hindrance in developing such a land-use plan? It turns out that the Hanford Comprehensive Land-Use Plan EIS Record of Decision (ROD) (64 FR 61615; November 12, 1999) marks the end of a successful, albeit

323

Quarterly Coal Distribution Report 1st Quarter 2012  

U.S. Energy Information Administration (EIA)

1st Quarter 2012 June 2012 Quarterly Coal Distribution Report www.eia.gov U.S. Department of Energy Washington, DC 20585

324

Quarterly Coal Distribution Report 2nd Quarter 2012  

U.S. Energy Information Administration (EIA)

October 2012 Independent Statistics & Analysis www.eia.gov . U.S. Department of Energy Washington, DC 20585 . Quarterly Coal Distribution Report 2nd Quarter 2012

325

Quarterly Coal Distribution Report 3rd Quarter 2011  

U.S. Energy Information Administration (EIA)

3rd Quarter 2011 January 2012 Quarterly Coal Distribution Report www.eia.gov U.S. Department of Energy Washington, DC 20585

326

AAI Quarterly Meeting Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI Quarterly Meeting Minutes August 1, 2007 AAI Updates - Rod Gerig USPAS Schools * USPAS 2008 Winter School - University of California, Santa Cruz January 14-25, 2008 * USPAS...

327

Quarterly Coal Report  

Annual Energy Outlook 2012 (EIA)

December 2010 DOEEIA-0121 (201003Q) Revised: July 2012 Quarterly Coal Report July - September 2010 December 2010 U.S. Energy Information Administration Office of Oil, Gas, and...

328

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Main Text and Appendixes A-H 1: Main Text and Appendixes A-H June 2004 U.S. Department of Energy Office of Environmental Management Cover Sheet Portsmouth DUF 6 Conversion Final EIS iii COVER SHEET * RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Ports_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

329

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Portsmouth DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Ports_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

330

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Paducah DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process,

331

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Main Text and Appendixes A-H 1: Main Text and Appendixes A-H June 2004 U.S. Department of Energy Office of Environmental Management Cover Sheet Paducah DUF 6 Conversion Final EIS iii COVER SHEET * RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

332

Experimental results from the first year of operation of the solar ground coupling research facility at Brookhaven National Laboratory  

DOE Green Energy (OSTI)

Results from the first year of operation of the solar ground coupling research facility at Brookhaven National Laboratory (BNL) are presented. Nine experiments which are first generation ground coupled heat transfer and storage devices for a solar source heat pump system have been operated since December 1978. A computer program called GROCS which models the heat transfer between these devices and the earth has been written (and subsequently integrated with the solar energy system simulation program TRNSYS by John W. Andrews). In this paper the ground coupling research program, the first generation experiments, and the underground heat flow model GROCS are described. Experimental results from December 1978 to September 1979 are presented and compared to model directions.

Meta, P D

1979-01-01T23:59:59.000Z

333

4Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2005 (PDF), Facility Representative Program Performance 4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. As of December 31, 2005 78% of all FRs were fully qualified , down from the 84% the previous quarter, and below the DOE goal of 80%. Site offices hired 11 new FRs in the quarter and several sites moved FRs to new facilities, thus requiring new qualifications.

334

TYPE OF OPERATION R Research & Development T& Facility Type  

Office of Legacy Management (LM)

--____ --____ R Research & Development T& Facility Type 0 Production scale testing a Pilat scale Y-. Bench Scale Process i Theoretical Studies Sample & Analysis 0 Productian 0 Disposal/Storage a Research Organization a Government 0 Other Sponsored i F[fa' tty ------__------__ I Prime 5 Subcontractor 0 Purchase Order a Other information (i.e., cost + fixed fee, unit p CgNTRACTING PERIOD: L.&G , PX& & cx LFkoL ~~~~~~~~~----------_ __ _______ OWNERSH; P: AEC/MED AEC/MED GOVT GOVT CONTRACTOR Cot+ "ACTOR OWNED LEASED ----- -----_ w!ET) C_EtlSLE ~~s!_NE!?~~ z L ACZD -------- - LANDS a BUILDINGS 0 EQUIPMENT u ORE OR RAW MATL FINAL PRODUCT f i ; : ' 0 WASTE .% RESIDLIE q 0 G G &EC/NED INVOLVEtiE?4T AT SITE .--------_------___~~~~~~~-- ,I

335

California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rouggly, energy manager at SSA's Frank Hagel Federal Building in Richmond Rouggly, energy manager at SSA's Frank Hagel Federal Building in Richmond California, reports that the facility garnered $35,000 in credits in 2011 on PG&E's Peak Day Pricing (PDP) tariff. "Frankly I was stunned! It's getting a lot of positive attention with our management," said Rouggly. "We were able to drop 400 kW by pre-cooling the building and shutting down one chiller during peak events. We also turned off 2 of our 8 elevators and reduced lighting in corridors to emergency levels. We got about $100 per day just for being on the program, but the big credits we earned were for trimming demand and reducing kWh during peak events." Rouggly plans to increase curtailment efforts further this summer. Dynamic pricing electricity tariffs,

336

Initial Activation and Operation of the Power Conditioning System for the National Ignition Facility  

DOE Green Energy (OSTI)

The NIF Power Conditioning System (PCS) resides in four Capacitor Bays, supplying energy to the Master and Power Amplifiers which reside in the two adjacent laser bays. Each capacitor bay will initially house 48 individual power conditioning modules, shown in Figure 2, with space reserved for expansion to 54 modules. The National Ignition Facility (NIF) Power Conditioning System (PCS) is a modular capacitive energy storage system that will be capable of storing nearly 400 MJ of electrical energy and delivering that energy to the nearly 8000 flashlamps in the NIF laser. The first sixteen modules of the power conditioning system have been built, tested and installed. Activation of the first nine power conditioning modules has been completed and commissioning of the first ''bundle'' of laser beamlines has begun. This paper will provide an overview of the power conditioning system design and describe the status and results of initial testing and activation of the first ''bundle'' of power conditioning modules.

Newton, M A; Kamm, R E; Fulkerson, E S; Hulsey, S D; Lao, N; Parrish, G L; Pendleton, D L; Petersen, D E; Polk, M; Tuck, J M; Ullery, G T; Moore, W B

2003-08-20T23:59:59.000Z

337

Design and operational considerations of United States commercial near-surface low-level radioactive waste disposal facilities  

Science Conference Proceedings (OSTI)

In accordance with the Low-Level Radioactive Waste Policy Amendments Act of 1985, states are responsible for providing for disposal of commercially generated low-level radioactive waste (LLW) within their borders. LLW in the US is defined as all radioactive waste that is not classified as spent nuclear fuel, high-level radioactive waste, transuranic waste, or by-product material resulting from the extraction of uranium from ore. Commercial waste includes LLW generated by hospitals, universities, industry, pharmaceutical companies, and power utilities. LLW generated by the country`s defense operations is the responsibility of the Federal government and its agency, the Department of Energy. The commercial LLRW disposal sites discussed in this report are located near: Sheffield, Illinois (closed); Maxey Flats, Kentucky (closed); Beatty, Nevada (closed); West Valley, New York (closed); Barnwell, South Carolina (operating); Richland, Washington (operating); Ward Valley, California, (proposed); Sierra Blanca, Texas (proposed); Wake County, North Carolina (proposed); and Boyd County, Nebraska (proposed). While some comparisons between the sites described in this report are appropriate, this must be done with caution. In addition to differences in climate and geology between sites, LLW facilities in the past were not designed and operated to today`s standards. This report summarizes each site`s design and operational considerations for near-surface disposal of low-level radioactive waste. The report includes: a description of waste characteristics; design and operational features; post closure measures and plans; cost and duration of site characterization, construction, and operation; recent related R and D activities for LLW treatment and disposal; and the status of the LLW system in the US.

Birk, S.M.

1997-10-01T23:59:59.000Z

338

Pathway from the National Ignition Facility to an operational LIFE power plant  

E-Print Network (OSTI)

next step, after NIF, is construction of a full-scale power plant NIF-1111-23807.ppt 4 #12 delivery #12;7NIF-1111-23807.ppt #12;Principle of LIFE plant operation Heat transfer DT fuel cycle for high plant availability NIF-based fusion performance, with low tritium inventory in the plant

339

Financial News for Major Energy Companies, Fourth Quarter 2005  

Gasoline and Diesel Fuel Update (EIA)

Fourth Quarter 2005 Fourth Quarter 2005 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $28.7 billion on revenues of $298.4 billion (i.e., 9.6 cents of net income per dollar of revenue) during the fourth quarter of 2005 (Q405). The level of net income for Q405 was 43 percent higher than in the fourth quarter of 2004 (Q404) (Table 1). Net income for Q405

340

4Q CY2007, Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2008 6, 2008 MEMORANDUM FROM: DEPARTMENTAL REPRESENTATNE TO THE DEFENSE NUCLEAR FACILITIES SAFETY BOARD OFFICE OF HEALTH, SAFETY AND SECURITY SUBJECT: Facility Representative Program Performance Indicators Quarterly Report, October - December (4th Quarter CY2007) Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2007. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 83% Fully Qualified (last Quarter was 82%) 85% Staffing Level (last Quarter was 93%) 45% Time Spent in the Field (DOE goal is >40%)

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2Q CY2007, Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0,2007 0,2007 M E M 0 R A N D ; p s ' X Z FROM: M RK B. WHI DEPARTMENTAL REPRESENTATIVE TO THE DEFENSE NUCLEAR FACILITIES SAFETY BOARD OFFICE OF HEALTH, SAFETY AND SECURITY SUBJECT: Facility Representative Program Performance Indicators Quarterly Report, April - June (2nd Quarter CY2007) Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 74% Fully Qualified (last Quarter was 72%) 94% Staffing Level (last Quarter was 9 1 %)

342

3Q CY2011 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2011 (PDF), Facility Representative Program Performance 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July through September 2011. Data for these indicators were gathered by Field Elements per Department of Energy's (DOE) Technical Standard (STD) 1063-2011, Facility Representatives, and reported to Headquarters Program Offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for July - September 2011 More Documents & Publications 3Q CY2010 (PDF), Facility Representative Program Performance Indicators

343

1Q CY2012 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2012 (PDF), Facility Representative Program Performance 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were gathered by Field elements per Department of Energy (DOE) Technical Standarf 1063-2011, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for January-March 2012 More Documents & Publications 1Q CY2011 (PDF), Facility Representative Program Performance Indicators

344

List of currently classified documents relative to Hanford Production Facilities Operations originated on the Hanford Site between 1961 and 1972  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) has declared that all Hanford plutonium production- and operations-related information generated between 1944 and 1972 is declassified. Any documents found and deemed useful for meeting Hanford Environmental Dose Reconstruction (HEDR) objectives may be declassified with or without deletions in accordance with DOE guidance by Authorized Derivative Declassifiers. The September 1992, letter report, Declassifications Requested by the Technical Steering Panel of Hanford Documents Produced 1944--1960, (PNWD-2024 HEDR UC-707), provides an important milestone toward achieving a complete listing of documents that may be useful to the HEDR Project. The attached listing of approximately 7,000 currently classified Hanford-originated documents relative to Hanford Production Facilities Operations between 1961 and 1972 fulfills TSP Directive 89-3. This list does not include such titles as the Irradiation Processing Department, Chemical Processing Department, and Hanford Laboratory Operations monthly reports generated after 1960 which have been previously declassified with minor deletions and made publicly available. Also Kaiser Engineers Hanford (KEH) Document Control determined that no KEH documents generated between January 1, 1961 and December 31, 1972 are currently classified. Titles which address work for others have not been included because Hanford Site contractors currently having custodial responsibility for these documents do not have the authority to determine whether other than their own staff have on file an appropriate need-to-know. Furthermore, these documents do not normally contain information relative to Hanford Site operations.

Not Available

1993-04-01T23:59:59.000Z

345

2Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2003 (PDF), Facility Representative Program Performance 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from April to June 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. A total of 13 Facility Representatives transferred to other positions during the quarter. Five of these accepted Facility Representative positions at other sites. Of the 8 that left the Program. 1 recieved a promotion and 7 accepted lateral positions. All of

346

2Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2006 (PDF), Facility Representative Program Performance 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. 2Q CY2006, Facility Representative Program Performance Indicators More Documents & Publications 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2004 (PDF), Facility Representative Program Performance Indicators

347

OPERATING EXPERIENCE WITH THE SODIUM REACTOR EXPERIMENT AND ITS APPLICATION TO THE HALLAM NUCLEAR POWER FACILITY  

SciTech Connect

The Sodium Reactor Experiment (SRE) was constructed to demonstrate the feasibility of sodium-oooled graphitemoderated reactors for central station power. The operating experience of SRE has provided valuable data for the design of the Hallam Nuclear Power Facillty (HNPF) now under construction. Some of the difficulties found in the SRE, which HNPF will be designed to avoid, are the sodium-sodium intermediate heat exchanger (horizontal position in SRE gave trouble; a vertical position will be used in HNPF), sodium pumps, handling of broken fuel elements, and excessive thermal stresses due to inadequate coolant flow. Other features of HNPF include the addition of an activity monitoring system for the core cover gas, elimination of tetralin for auxiliary cooling of plant equipment, instrumentation of fuel elements, and addition of carbon traps in the primary sodium system. SRE operation has demonstrated unusual reactor stability and capability for rapid power changes. (D.L.C.)

Beeley, R.J.; Mahlmeister, J.E.

1960-01-01T23:59:59.000Z

348

Test Operation of Oxygen-Enriched Incinerator for Wastes From Nuclear Fuel Fabrication Facility  

SciTech Connect

The oxygen-enriched combustion concept, which can minimize off-gas production, has been applied to the incineration of combustible uranium-containing wastes from a nuclear fuel fabrication facility. A simulation for oxygen combustion shows the off-gas production can be reduced by a factor of 6.7 theoretically, compared with conventional air combustion. The laboratory-scale oxygen enriched incineration (OEI) process with a thermal capacity of 350 MJ/h is composed of an oxygen feeding and control system, a combustion chamber, a quencher, a ceramic filter, an induced draft fan, a condenser, a stack, an off-gas recycle path, and a measurement and control system. Test burning with cleaning paper and office paper in this OEI process shows that the thermal capacity is about 320 MJ/h, 90 % of design value and the off-gas reduces by a factor of 3.5, compared with air combustion. The CO concentration for oxygen combustion is lower than that of air combustion, while the O2 concentration in off-gas is kept above 25 vol % for a simple incineration process without any grate. The NOx concentration in an off-gas stream does not reduce significantly due to air incoming by leakage, and the volume and weight reduction factors are not changed significantly, which suggests a need for an improvement in sealing.

Kim, J.-G.; Yang, H.cC.; Park, G.-I.; Kim, I.-T.; Kim, J.-K.

2002-02-26T23:59:59.000Z

349

Spar buoy construction having production and oil storage facilities and method of operation  

SciTech Connect

This patent describes a floating structure including oil storage capacity and production facilities and adapted to be anchored by catenary mooring lines at a subsea well location, the combination of: a vertical elongated hull means having means to maintain the hull means in vertical position; the hull means including a vertical oil storage chamber means for storing oil and extending for a major portion of the height of the floating structure; vertical variable ballast chamber means extending from the bottom of the storage chamber means to above the top of the oil storage chamber means and selectively filled with ballast to maintain the center of gravity of the structure a selected distance from the center of buoyancy of the structure; work chamber means in the hull means above the oil storage chamber means; means in the work chamber means and in the variable ballast chamber means for controlling the amount of ballast in the variable ballast means; means in the oil storage chamber means and in the work chamber means for feeding oil to the oil storage chamber means and for removing water therefrom as oil is introduced therein; a central longitudinal passageway through the hull means; a riser means extending into the passageway from the subsea well location and terminating at the work chamber means; means on the riser buoyant tank means and on the hull means in the central passageway for guiding relative movement between the hull means and the riser means.

Daniell, A.F.

1986-08-19T23:59:59.000Z

350

Federal Technical Capability Program - Quarterly Performance Indicator  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Performance Indicator Reports Quarterly Performance Indicator Reports 2013 Quarterly Report on Federal Technical Capability August 16, 2013 Quarterly Report on Federal Technical Capability June 5, 2013 Quarterly Report on Federal Technical Capability February 20, 2013 2012 Quarterly Report on Federal Technical Capability November 20, 2012 Quarterly Report on Federal Technical Capability August 8, 2012 Quarterly Report on Federal Technical Capability May 30, 2012 Quarterly Report on Federal Technical Capability March 6, 2012 2011 Quarterly Report on Federal Technical Capability November 10, 2011 Quarterly Report on Federal Technical Capability August 24, 2011 Quarterly Report on Federal Technical Capability May 18, 2011 Quarterly Report on Federal Technical Capability February 23, 2011

351

EIA -Quarterly Coal Distribution  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Distribution Coal Distribution Home > Coal> Quarterly Coal Distribution Back Issues Quarterly Coal Distribution Archives Release Date: June 27, 2013 Next Release Date: September 2013 The Quarterly Coal Distribution Report (QCDR) provides detailed quarterly data on U.S. domestic coal distribution by coal origin, coal destination, mode of transportation and consuming sector. All data are preliminary and superseded by the final Coal Distribution - Annual Report. Year/Quarters By origin State By destination State Report Data File Report Data File 2009 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf October-December pdf xls pdf 2010 January-March pdf xls pdf xls April-June pdf xls pdf xls July-September pdf xls pdf xls

352

JGI - Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations The Operations Department sees to it that JGI has the best possible facilities and support, ensuring that its operations are conducted in accordance with the...

353

Photon Sciences | Navigation | Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities NSLS About NSLS Accelerator Activity Report Experimental Systems Machine Status & History Operations & Engineering Operating Schedules Ring Parameters NSLS Ops:...

354

Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 March 1999 Summary S-1 SUMMARY S.1 Introduction and Background The U.S. Department of Energy (DOE) is re- sponsible for ensuring that the nation has a sup- ply of materials sufficient to maintain its nuclear weapons stockpile at levels directed by the President of the United States. One of these materials is tritium - a gaseous isotope of hy- drogen that increases the yield of nuclear weap- ons. None of the weapons in the nuclear arsenal would be capable of functioning as designed without tritium. As long as the United States chooses to maintain a nuclear deterrent - of any size - it will need tritium. There are two factors that dictate the timing re- garding the nation's need for tritium. The first is that the U.S. no longer has the operating facili- ties needed to produce tritium. DOE has shut

355

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 3rd Quarter 2013 Domestic Uranium Production Report Release Date: October 31, 2013 Next Release Date: February 2014 2012 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 Cameco Crow Butte Operation Dawes, Nebraska 1,000,000 Operating Operating Operating Operating Hydro Resources, Inc. Church Rock McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Hydro Resources, Inc. Crownpoint McKinley, New Mexico 1,000,000 Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Partially Permitted And Licensed Lost Creek ISR, LLC, a subsidiary of Ur- Energy USA Inc. Lost Creek Project Sweetwater, Wyoming 2,000,000 Under Construction Under Construction

356

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

2. Number of uranium mills and plants producing uranium concentrate in the United States" 2. Number of uranium mills and plants producing uranium concentrate in the United States" "Uranium Concentrate Processing Facilities","End of 1996","End of 1997","End of 1998","End of 1999","End of 2000","End of 2001","End of 2002","End of 2003","End of 2004","End of 2005","End of 2006","End of 2007","End of 2008","End of 2009","End of 2010","End of 2011","End of 2012","End of 3rd Quarter 2013" "Mills - conventional milling 1",0,0,0,1,1,0,0,0,0,0,0,0,1,0,1,1,1,0 "Mills - other operations 2",2,3,2,2,2,1,1,0,0,1,1,1,0,1,0,0,0,1 "In-Situ-Leach Plants 3",5,6,6,4,3,3,2,2,3,3,5,5,6,3,4,5,5,5

357

Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, CA (DOE/EA-1442) (12/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, California December 2002 Department of Energy National Nuclear Security Administration Oakland Operations Office EA for the Proposed Construction and Operation of a Biosafety Level 3 Facility at LLNL ii EXECUTIVE SUMMARY The Department of Energy (DOE), National Nuclear Security Administration (NNSA), has responsibility for national programs to reduce and counter threats from weapons of mass destruction including nuclear, chemical, and biological weapons (bioweapons). NNSA's bioscience work at Lawrence Livermore National Laboratory (LLNL) in support of these missions requires work with infectious agents, including those historically used for bioweapons.

358

Operation Plans for Anadromous Fish Production Facilities in the Columbia River Basin : Annual Report 1995 : Volume III - Washington.  

DOE Green Energy (OSTI)

Beaver Creek Hatchery is located on the Elochoman River about 10 miles upstream from the river mouth. The Elochoman River is a north bank tributary of the lower Columbia River, just downstream of Cathlamet, Washington. The facility consists of 10 intermediate raceways, 20 raceways, (1) earthen rearing pond, (2) adult holding ponds, and a hatchery building with 60 troughs. It is staffed with 4 FTE`s. Water rights total 16,013 gpm from three sources: Elochoman River, Beaver Creek and a well. Beaver Creek water is gravity flow while the other two sources are pumped. The Elochoman River is used in summer and fall while Beaver Creek water is used from mid-November through mid-May. Filtered well water (1 cfs) is used to incubate eggs and for early rearing of fry. Water use in summer is about 5,800 gpm. Gobar Pond, a 0.93-acre earthen rearing pond located on Gobar Creek (Kalama River tributary), is operated as a satellite facility.

Colville Confederated Tribes; US Fish and Wildlife Service; Washington Department of Fish and Wildlife; Yakama Indian Nation

1996-06-01T23:59:59.000Z

359

Enforcement Letter - Evaluation of Deficiencies Operational Emergency at Building 6000, Holifield Radioactive Ion Beam Facility, Oak Ridge National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3,2009 3,2009 Dr. Thom Mason President and CEO UT-Battelle Oak Ridge National Laboratory P.O. Box 2008 Oak Ridge, Tennessee 37831-6255 Dear Dr. Mason: The Department of Energy's Office of Enforcement within the Office of Health, Safety and Security has conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-ORO--0RNL-XlOPHYSICS-2008-0001, Operational Emergency at Building 6000, Holzfield Radioactive Ion Beam Facility. Our evaluation included a review of the Oak Ridge National Laboratory (ORNL) Management Investigation Team Report dated November 19,2008, the associated corrective action plan, and discussions with site personnel. The subject NTS report described a series of deficiencies at the Holifield Radioactive Ion

360

Solar water-heating system for the Ingham County geriatric medical care facility, Okemos, Michigan. Operational and maintenance instruction manual  

DOE Green Energy (OSTI)

The objectives of the Ingham County Solar Project include: the demonstration of a major operational supplement to fossil fuels, thereby reducing the demand for non-renewable energy sources, demonstration of the economic and technical feasibility of solar systems as an important energy supplement over the expected life of the building, and to encourage Michigan industry to produce and incorporate solar systems in their own facility. The Ingham County solar system consists of approximately 10,000 square feet of solar collectors connected in a closed configuration loop. The primary loop solution is a mixture of water and propylene glycol which flows through the tube side of a heat exchanger connected to the primary storage tank. The heat energy which is supplied to the primary storage tank is subsequently utilized to increase the temperature of the laundry water, kitchen water, and domestic potable water.

Not Available

1983-07-29T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Design, fabrication and operation of a biomass fermentation facility. Technical progress report No. 2, January 1-March 31, 1979  

DOE Green Energy (OSTI)

The conceptual design for a three oven-dry ton per day biomass fermentation facility is presented. Based on a detailed evaluation of emerging technologies and improved modifications of current technology, a mainstream process and optional unit operation and sub-systems have been selected which offer the greatest probability of success for an economic and technically feasible process for production of ethanol from lignocellulosic biomass (hardwoods, wheat straw, corn stover, etc.). The design is intentionally flexible as stipulated in the contractual objectives. Recommendations of equipment is premised on its versatility for multi-functional application, thus enabling investigation to assess a number of process configurations while adhering to a cost-effective capital investment in the process development unit. A specific criterion in selection has been to facilitate the generation of engineering data based on the application of the results of research contractors of the US Department of Energy. The design for a total system includes the facility for evaluation of three pretreatment options, for isolation of by-product streams, for evaluation of acid and enzymatic hydrolysis, sugar concentration, alternative fermentation technologies and alcohol recovery for production of absolute ethanol. In order to maintain capital costs for the PDU within reasonable limits monitoring of by-product streams will be undertaken and, for unit operation with high potential (such as membrane concentration of ethanol) but which are in early stages of development smaller-scale equipment and/or plumbing taps for late addition of full-scale (i.e., PDU-scale) equipment is recommended. The rationale, and process economics, upon which the recommendations are based is detailed, as is a study of biomass feedstock availability.

O'Neil, D.J.; Colcord, A.R.; Bery, M.K.

1979-04-01T23:59:59.000Z

362

3Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2007 (PDF), Facility Representative Program Performance 3Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2007. Data for these indicators are gathered by Field elements quarterly per Department of Energy (DOE-STD-1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarter 's data concluded: 3Q CY2007, Facility Representative Program Performance Indicators More Documents & Publications 2Q CY2009 (PDF), Facility Representative Program Performance Indicators

363

4Q CY2004 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 (PDF), Facility Representative Program Performance 4 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from October to December 2004. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the FR program. As of December 31, 2004, 86% of all FRs were fully qualified,down from 89% the previous quarter, and exceeding the DOE goal of 80%. Several sites added new FRs or switched FRs from their exisiting facilities to new facilities, reducing the overall qualification rate.

364

History of remote operations and robotics in nuclear facilities. Robotics and Intelligent Systems Program  

SciTech Connect

The field of remote technology is continuing to evolve to support man`s efforts to perform tasks in hostile environments. Remote technology has roots which reach into the early history of man. Fireplace pokers, blacksmith`s tongs, and periscopes are examples of the beginnings of remote technology. The technology which we recognize today has evolved over the last 45-plus years to support human operations in hostile environments such as nuclear fission and fusion, space, underwater, hazardous chemical, and hazardous manufacturing. The four major categories of approach to remote technology have been (1) protective clothing and equipment for direct human entry, (2) extended reach tools using distance for safety, (3) telemanipulators with barriers for safety, and (4) teleoperators incorporating mobility with distance and/or barriers for safety. The government and commercial nuclear industry has driven the development of the majority of the actual teleoperator hardware available today. This hardware has been developed due to the unsatisfactory performance of the protective-clothing approach in many hostile applications. Systems which have been developed include crane/impact wrench systems, unilateral power manipulators, mechanical master/slaves, and servomanipulators. Work for space applications has been primarily research oriented with few successful space applications, although the shuttle`s remote manipulator system has been successful. In the last decade, underwater applications have moved forward significantly, with the offshore oil industry and military applications providing the primary impetus. This document consists of viewgraphs and subtitled figures.

Herndon, J.N.

1992-05-01T23:59:59.000Z

365

Standard guide for mechanical drive systems for remote operation in hot cell facilities  

E-Print Network (OSTI)

1.1 Intent: 1.1.1 The intent of this standard is to provide general guidelines for the design, selection, quality assurance, installation, operation, and maintenance of mechanical drive systems used in remote hot cell environments. The term mechanical drive systems used herein, encompasses all individual components used for imparting motion to equipment systems, subsystems, assemblies, and other components. It also includes complete positioning systems and individual units that provide motive power and any position indicators necessary to monitor the motion. 1.2 Applicability: 1.2.1 This standard is intended to be applicable to equipment used under one or more of the following conditions: 1.2.1.1 The materials handled or processed constitute a significant radiation hazard to man or to the environment. 1.2.1.2 The equipment will generally be used over a long-term life cycle (for example, in excess of two years), but equipment intended for use over a shorter life cycle is not excluded. 1.2.1.3 The ...

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

366

Design and operation of an inert gas facility for thermoelectric generator storage  

DOE Green Energy (OSTI)

While the flight hardware is protected by design from the harsh environments of space, its in-air storage often requires special protection from contaminants such as dust, moisture and other gases. One of these components, the radioisotope thermoelectric generator (RTG) which powers the missions, was deemed particularly vulnerable to pre-launch aging because the generators remain operational at core temperatures in excess of 1000 degrees centigrade throughout the storage period. Any oxygen permitted to enter the devices will react with thermally hot components, preferentially with molybdenum in the insulating foils, and with graphites to form CO/CO{sub 2} gases which are corrosive to the thermopile. It was important therefore to minimize the amount of oxygen which could enter, by either limiting the effective in-leakage areas on the generators themselves, or by reducing the relative amount of oxygen within the environment around the generators, or both. With the generators already assembled and procedures in place to assure minimal in-leakage in handling, the approach of choice was to provide a storage environment which contains significantly less oxygen than normal air. 2 refs.

Goebel, C.J.

1990-01-01T23:59:59.000Z

367

Tennessee Energy Statistics Quarterly, third quarter 1984  

Science Conference Proceedings (OSTI)

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow - production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1984-01-01T23:59:59.000Z

368

Microsoft PowerPoint - C-Mod_quarterly_res_highlights_21.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Q4 Q4 23 October 2009 Developing the steady state, high-Z wall, high-field tokamak for ITER and beyond C-Mod Quarterly Review FY2009 Q4 * E. Marmar - Research Highlights * R. Granetz - FY09 research statistics; FY10 research plans * J. Irby - Operations and Diagnostics: FY09 highlights, FY10 plans * S. Wukitch - Advanced ICRF antenna and Fast Ferrite Tuner upgrades: status and plans * D. Whyte - FY09 Joint Facility Research Milestone: Hydrogenic Retention * B. Labombard - FY10 Joint Facility Research Milestone: Scrape-Off Layer Transport and Divertor Power Handling Agenda Recent Research Highlights * Many new and interesting results from FY2009 research operations (9.1 weeks) - Improved confinement "I-mode" - Neon and nitrogen seeded plasmas (all regimes) - H-mode pedestal physics (APS invited)

369

Year Four, 104th Congress, 3rd quarter report, January 1, 1995--March 31, 1995. DOE/KEURP Site Operator Program  

Science Conference Proceedings (OSTI)

Kansas State University is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations an opportunity to examine the latest EHV prototypes under actual operating conditions.

NONE

1995-06-01T23:59:59.000Z

370

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

March 2011 DOEEIA-0121 (201004Q) Revised: July 2012 Quarterly Coal Report October - December 2010 March 2011 U.S. Energy Information Administration Office of Oil, Gas, and Coal...

371

3rd Quarter 2013 Domestic Uranium Production Report  

U.S. Energy Information Administration (EIA) Indexed Site

4. U.S. uranium in-situ-leach plants by owner, location, capacity, and operating status" 4. U.S. uranium in-situ-leach plants by owner, location, capacity, and operating status" "In-Situ-Leach Plant Owner","In-Situ-Leach Plant Name","County, State (existing and planned locations)","Production Capacity (pounds U3O8 per year)","Operating Status at End of" ,,,,2012,"1st Quarter 2013","2nd Quarter 2013","3rd Quarter 2013" "Cameco","Crow Butte Operation","Dawes, Nebraska",1000000,"Operating","Operating","Operating","Operating" "Hydro Resources, Inc.","Church Rock","McKinley, New Mexico",1000000,"Partially Permitted And Licensed","Partially Permitted And Licensed","Partially Permitted And Licensed","Partially Permitted And Licensed"

372

Facility Representative Program: Facility Representative of the Year  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Facility Representative Office of Nuclear Safety Home Facility Representative Home Annual Facility Rep Workshop › 2012 › 2011 › 2010 › 2009 › 2008 › 2007 › 2006 › 2005 › 2004 › 2003 › 2002 › 2001 › 2000 DOE Safety Links › ORPS Info › Operating Experience › DOE Lessons Learned › Accident Investigation Assessment Tools › FR CRADs › Surveillance Guides › Manager's Guide for Safety and Health Subject Matter Links General Program Information › Program Mission Statement › Program Directives and Guidance › FR of the Year Award Program › FR of the Year Award › FR Program Assessment Guide (Appendix B, DOE STD 1063-2011) FR Quarterly Performance Indicators Training & Qualification Information › Qualification Standards › Energy Online Courses

373

2Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2005 (PDF), Facility Representative Program Performance 2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. As of June 30,2005, 97% of all FRs were fully qualified, down from 88% the previous quarter, but exceeding the DOE goal of 80%. Eighteen of 27 reporting sites meet the goal of FR qualifications. 2Q CY2005, Facility Representative Program Performance Indicators

374

3Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2005 (PDF), Facility Representative Program Performance 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. As of September 30,2005, 84% of all FRs were fully qualified , down from 87% the previous quarter, but exceeding the DOE goal of 80%. Several sites shifted fully-qualifed FRs to new facilities, thus requiring new qualifications. Although the overall percentage of fully qualified FRS

375

Final Revised Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

R R Final Revised Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory, Livermore, California Issued: December 2002 Revised: January 2008 Department of Energy National Nuclear Security Administration Livermore Site Office This page intentionally left blank. FINAL Revised EA for the Proposed Construction and Operation of a Biosafety Level 3 Facility at LLNL ii FORWARD The National Nuclear Security Administration (NNSA) of the Department of Energy (DOE) has responsibility for national programs to reduce and counter threats from weapons of mass destruction including nuclear, chemical, and biological weapons (bioweapons). NNSA's bioscience work at Lawrence Livermore National Laboratory (LLNL) in support of these

376

Final Environmental Assessment for the Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

562 562 Environmental Assessment Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington U.S. Department of Energy Pacific Northwest Site Office Richland, Washington 99352 Final January 2007 U.S. Department of Energy DOE/EA-1562 Environmental Assessment S-1 January 2007 Summary Introduction. This Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy (DOE) activities associated with constructing and operating a new Physical Sciences Facility (PSF) complex on DOE property located in Benton County, north of Richland, Washington. The proposed PSF would replace a number of existing research laboratories in the Hanford

377

Financial News for Major Energy Companies, Second Quarter 2006  

Gasoline and Diesel Fuel Update (EIA)

Second Quarter 2006 Overview The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or do not provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $30.1 billion on revenues of $297.1 billion during the second quarter of 2006 (Q206). The level of net income for Q206 was 36 percent higher than in the second quarter of 2005 (Q205) (Table 1). Net income for Q206 increased primarily as a result of higher crude oil

378

Tennessee Energy Statistics Quarterly. Second quarter 1984  

SciTech Connect

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity. The Tennessee Energy Statistics Quarterly has been developed by the Tennessee Energy Data Base Program to serve as a supplement to the Energy Division publication - The Tennessee Energy Profiles: 1960-1980. Historical data reported in this volume cover the production and utilization of major energy supplies by fuel type and economic sectors, as well as other energy data such as prices and fuel distribution. 12 figures, 12 tables.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1985-01-01T23:59:59.000Z

379

Facility Representative Program Performance Indicators for October - December 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR DISTRIBUTION FOR DISTRIBUTION FROM: ANDREW C. LAWRENCE DIRECTOR OFFICE OF NUCLEAR SAFETY, QUALITY ASSURANCE AND ENVIRONMENT OFFICE OF HEALTH, SAFETY AND SECURITY SUBJECT: Facility Representative Program Performance Indicators Quarterly Report, October-December (Fourth Quarter Calendar Year 2010) This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period October through December 2010. Data for these indicators were gathered by Field Elements quarterly per Department of Energy (DOE) Standard (STD)-1063-2006, Facility Representatives, and reported to Headquarters Program Offices for evaluation and feedback to improve the FR Program. Highlights from this report are presented below:

380

Quarterly Coal Report - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Quarterly Coal Report Quarterly Coal Report Release Date: October 02, 2013 | Next Release Date: December 2013 | full report Previous Quarterly Coal Data historical data (PDF): 1st quarter 2013 4th quarter 2012 3rd quarter 2012 2nd quarter 2012 1st quarter 2012 4th quarter 2011 3rd quarter 2011 2nd quarter 2011 1st quarter 2011 prior to 2011 Go The Quarterly Coal Report (QCR) provides detailed quarterly data on U.S. coal production, exports, imports, receipts, prices, consumption, quality, stocks, and refined coal. Data on U.S. coke production, consumption, stocks, imports, and exports are also provided. All data for 2011 and prior years are final. All data for 2012 and 2013 are preliminary. Highlights for second quarter 2013: U.S. coal production during second quarter 2013 totaled 243.1

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Back Issues of the Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

coal > Quarterly Coal Report > Quarterly Coal Report Back Issues Quarterly Coal Report Back Issues of the Quarterly Coal Report Year 4thquarter 3rdquarter 2ndquarter 1stquarter QCR...

382

Quarterly Report 09-01  

NLE Websites -- All DOE Office Websites (Extended Search)

Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Ÿ 265 N. East End Avenue, Pomona, California 91767 Ÿ USA Phone: 909-469-0315 Ÿ FAX: 909-469-0319 Ÿ Juan.Argueta@sce.com Demonstration and Evaluation of U.S. Postal Service Electric Carrier Route Vehicles Quarterly Report, September 2001 AQMD CONTRACT #00192 Project Number: TC-00-0101 Report Number: TC-00-0101-TR05 Electric Vehicle Technical Center An ISO 9001 Certified Facility Prepared by: Michel Wehrey Juan C. Argueta Fabian Sanchez Julie M. Phung Southern California Edison September 26, 2001 Page i DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES This report was prepared by the Electric Transportation Division of Southern California Edison, a subsidiary of Edison International. Neither the Electric Transportation Division of Southern California Edison, Southern

383

Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994  

SciTech Connect

Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

NONE

1995-04-01T23:59:59.000Z

384

FACILITIES OPERATIONS UTILITY MANAGEMENT  

E-Print Network (OSTI)

.................................................................................................................... 11 A. Natural Gas Use and Steam Distribution System......................................................................................................................... 9 A. Electrical Distribution System. Water Distribution

Peterson, Blake R.

385

Kansas State University DOE/KEURP Site Operator User Task Force. Year 3, Fourth quarterly report, April 1--June 30, 1994  

DOE Green Energy (OSTI)

This program relates to demonstration use of electric-powered vehicles. KSU has two electric cars (conversion vehicles) from Soleq. Corp., and is purchasing 4 Chevy trucks for conversion. This document discusses the participating groups, program plan, events, vehicles and components, operations, and procurement.

Hague, J.

1994-06-28T23:59:59.000Z

386

SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

387

ARM - SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

388

Lessons Learned Quarterly Report Cumulative Index | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Requirements Lessons Learned Lessons Learned Quarterly Report Cumulative Index Lessons Learned Quarterly Report Cumulative Index Guidance Requirements Lessons...

389

3Q C&2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q C&2008 (PDF), Facility Representative Program Performance 3Q C&2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q C&2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 80% Fully Qualified ( last Quarter was 87%) 89% Staffing Level ( last Quarter was 86%) 45% Time Spent in the Field (DOE goal is > 40%) 76% Time Spent in Oversight Activites (DOE Goal is >

390

EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter  

SciTech Connect

The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

Showalter, Mary Ann

2008-09-16T23:59:59.000Z

391

Chemistry Dept. Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facilities As a research organization within a National Laboratory, the Chemistry Department operates research facilities that are available to other researchers as...

392

Oak Ridge Reservation Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

processed for shipment to the Nevada Test Site or other appropriate disposal facility. Molten Salt Reactor Experiment Facility The Molten Salt Reactor Experiment (MSRE) operated...

393

EMSL Quarterly Highlights Report: 4th Quarter, FY08  

SciTech Connect

This report outlines the science highlights, publications, and other happenings at EMSL in 4th quarter of FY08.

Showalter, Mary Ann

2008-11-24T23:59:59.000Z

394

EMSL Quarterly Highlights Report: FY09, 4th Quarter  

Science Conference Proceedings (OSTI)

This document describes the science, accomplishments, and publications that occurred during the fourth quarter of Fiscal Year 2009 at EMSL.

Showalter, Mary Ann; Manke, Kristin L.; Kathmann, Loel E.; Wiley, Julie G.

2009-10-21T23:59:59.000Z

395

EMSL Quarterly Highlights Report: FY09, 3rd Quarter  

Science Conference Proceedings (OSTI)

This report outlines the science and publications that occurred at EMSL during the 3rd quarter of FY09.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.

2009-07-17T23:59:59.000Z

396

4Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2003 (PDF), Facility Representative Program Performance 4Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from October to December 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. As of December 31,2003, 93% of all Facility Representatives were fully qualified, exceeding the DOE goal of 80%. Currently, 23 of 27 sites meet the goal of 80%. Currently, 23 of 27 sites meet the goal for Facility Representative

397

Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, April-June 1980  

DOE Green Energy (OSTI)

The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government and an agency of the State of Maryland, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 30 June 1980. The Energy Quarterly Report is divided into three sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/RA), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Energy Conversion and Storage Techniques, contains three articles. The first is on data analysis of OTEC core unit condenser tests, and is supported by the Department of Energy/Division of Central Solar Technology (DOE/CST). The second is on the current status of the Community Annual Storage Energy System at the U.S. Naval Air Station, Norfolk, Va., and is supported by the Department of Energy and the Department of Defense, Naval Facilities Engineering Command/Atlantic Division. The third is on utilization of landfill methane and is supported by Argonne National Laboratory.

None

1980-06-01T23:59:59.000Z

398

Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1980  

DOE Green Energy (OSTI)

The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government and an agency of the State of Maryland, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/DGE), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, supported by the Reactor Safety Research Division of the Nuclear Regulatory Commission, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the U.S. Naval Air Station, Norfolk, Va. This work is supported by the Department of Energy and the Department of Defense, Naval Facilities Engineering Command/Atlantic Division.

Entingh, Daniel J.

1980-03-01T23:59:59.000Z

399

Lessons Learned Quarterly Report, March 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Lessons Learned Quarterly Report, March 2004 Welcome to the 38th quarterly report on lessons learned in the NEPA process. In this issue we are continuing a multi-part examination of lessons learned from Lessons Learned. We invite your suggestions on how to improve the Lessons Learned program. Thank you for your continuing support. Included in this issue: New, Improved "Green Book" Is on the Way Modern Pit Facility Final EIS Delayed NNSA Withdraws FONSI for LANL Biosafety Lab BLM Programmatic EIS On Wind Energy Lesson Learned about Schedule and Teamwork CEQ Chair Emphasizes NEPA's "Productive Harmony" Goal Supporting Flexible Decisionmaking in Practice NEPA Champions Brief Congressional Staff

400

Subj: Educational and General (E&G) Facility Support Provide an overview of Facility Operations, Maintenance, Repair and Renovation and Space  

E-Print Network (OSTI)

and infrastructure. Facilities Energy & Utilities: Energy and Utilities is responsible for campus-wide utility and maintain this system and its components. Deferred Maintenance: Given the age of buildings and the wear buildings and infrastructure in working order. Minor and Major Repairs: Generally, minor repairs include

Pohl, Karsten

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental assessment for the proposed construction and operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California  

Science Conference Proceedings (OSTI)

This document is an Environmental Assessment (EA) for a proposed project to modify 14,900 square feet of an existing building (Building 64) at Lawrence Berkeley Laboratory (LBL) to operate as a Genome Sequencing Facility. This EA addresses the potential environmental impacts from the proposed modifications to Building 64 and operation of the Genome Sequencing Facility. The proposed action is to modify Building 64 to provide space and equipment allowing LBL to demonstrate that the Directed DNA Sequencing Strategy can be scaled up from the current level of 750,000 base pairs per year to a facility that produces over 6,000,000 base pairs per year, while still retaining its efficiency.

NONE

1995-04-01T23:59:59.000Z

402

Short-term energy outlook. Quarterly projections, second quarter 1996  

Science Conference Proceedings (OSTI)

The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

NONE

1996-04-01T23:59:59.000Z

403

SNS Target Test Facility: Prototype Hg Operations and Remote Handling Tests P. T. Spampinato, T. W. Burgess, J. B. Chesser, V. B. Graves, and S.L. Schrock  

E-Print Network (OSTI)

SNS Target Test Facility: Prototype Hg Operations and Remote Handling Tests P. T. Spampinato, T. W remote handling techniques and tools for replacing target system components. During the past year seal configuration to assess leak tightness and remote handling features. In addition, testing

McDonald, Kirk

404

1Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 (PDF), Facility Representative Program Performance 6 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. As of March 31,2006 81% of all FRs were fully qualified,up from 78% the previous quarter, and just above the DOE goal of 80%. To assist site offices in continuing to meet the qualification goal, there will be two focused training sessions for FR candidates in the coming months. These

405

1Q CY2005 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2005 (PDF), Facility Representative Program Performance 1Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2005. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives. and reported to Headquarters program offices for evaluation and feedback in order to improve the FR Program. As of March 31st, 2005, 88% of all FRs were fully qualified, up from 86% the previous quarter, and exceeding the DOE goal of 80%. Several of the new FRs hired recently completed qualifications. Eighteen of 27 reporting sites meet the goal of FR qualifications

406

2Q CY2004 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2004 (PDF), Facility Representative Program Performance 2Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from April to June 2004. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the FR program. As of June 30, 2004, 89% of all FRs were fully qualified , exceeding the DOE goal of 80%, but down slightly from the previous quarter. Twenty of 28 reporting sites meet the goal for FR qualifications. Overall FR staffing is at 85% of the levels needed per the staffing

407

3Q CY2004 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2004 (PDF), Facility Representative Program Performance 3Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2004 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report Covering the Period from July to September 2004. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the FR program. As of September 30, 2004, 89% of all FRs were fully qualified, the same as last quarter, and exceeding the DOE goal of 80%. Twenty of 28 reporting sites meet the goal for FR qualifications. Overall FR stadding is at 85% of the levels needed per the staffing analysis methodology in

408

Quarterly SSP Experiment Summary-FY13-4Q final ...  

National Nuclear Security Administration (NNSA)

Quarter FY13Q1 FY13Q2 FY13Q3 FY13Q4 Dual Axis Radiographic Hydrodynamic Test (DARHT) facility LANL Integrated or Focused non- nuclear weapons experiments DARHT captures high...

409

Wetland assessment of the effects of construction and operation of a depleteduranium hexafluoride conversion facility at the Portsmouth, Ohio, site.  

SciTech Connect

The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This wetland assessment has been prepared by DOE, pursuant to Executive Order 11990 (''Protection of Wetlands'') and DOE regulations for implementing this Executive Order as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [Compliance with Floodplain and Wetland Environmental Review Requirements]), to evaluate potential impacts to wetlands from the construction and operation of a conversion facility at the DOE Portsmouth site. Approximately 0.02 acre (0.009 ha) of a 0.08-acre (0.03-ha) palustrine emergent wetland would likely be eliminated by direct placement of fill material during facility construction at Location A. Portions of this wetland that are not filled may be indirectly affected by an altered hydrologic regime because of the proximity of construction, possibly resulting in a decreased frequency or duration of inundation or soil saturation, and potential loss of hydrology necessary to sustain wetland conditions. Construction at Locations B or C would not result in direct impacts to wetlands. However, the hydrologic characteristics of nearby wetlands could be indirectly affected by adjacent construction. Executive Order 11990, ''Protection of Wetlands'', requires federal agencies to minimize the destruction, loss, or degradation of wetlands, and to preserve and enhance the natural and beneficial uses of wetlands. DOE regulations for implementing Executive Order 11990 are set forth in 10 CFR Part 1022. The impacts at Location A may potentially be avoided by an alternative routing of the entrance road, or mitigation may be developed in coordination with the appropriate regulatory agencies. Unavoidable impacts to wetlands that are within the jurisdiction of the USACE may require a CWA Section 404 Permit, which would trigger the requirement for a CWA Section 401 Water Quality Certification from the State of Ohio. Unavoidable impacts to isolated wetlands may require an Isolated Wetlands Permit from the Ohio Environmental Protection Agency. A mitigation plan may be required prior to the initiation of construction. Cumulative impacts to wetlands are anticipated to be negligible to minor for the proposed action, in conjunction with the effects of existing conditions and other activities. Habitat disturbance would involve settings commonly found in this part of Ohio, which in many cases involve previously disturbed habitats.

Van Lonkhuyzen, R.

2005-09-09T23:59:59.000Z

410

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

June 2010 DOE/EIA-0121 (2010/01Q) June 2010 DOE/EIA-0121 (2010/01Q) Revised: July 2012 Quarterly Coal Report January - March 2010 June 2010 U.S. Energy Information Administration Office of Oil, Gas, and Coal Supply Statistics U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.gov/coal/production/quarterly/ _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of

411

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

3Q) 3Q) Quarterly Coal Report July - September 2008 December 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

412

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2008 September 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

413

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

8/04Q) 8/04Q) Quarterly Coal Report October - December 2008 March 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

414

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

1Q) 1Q) Quarterly Coal Report January - March 2008 July 2008 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

415

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

2Q) 2Q) Quarterly Coal Report April - June 2009 September 2009 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

416

Quarterly Coal Report  

Gasoline and Diesel Fuel Update (EIA)

7/01Q) 7/01Q) Quarterly Coal Report January - March 2007 June 2007 Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization.

417

Analysis of operating alternatives for the Naval Computer and Telecommunications Station Cogeneration Facility at Naval Air Station North Island, San Diego, California  

SciTech Connect

The Naval Facilities Engineering Command Southwestern Division commissioned Pacific Northwest Laboratory (PNL), in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to determine the most cost-effective approach to the operation of the cogeneration facility in the Naval Computer and Telecommunications Station (NCTS) at the Naval Air Station North Island (NASNI). Nineteen alternative scenarios were analyzed by PNL on a life-cycle cost basis to determine whether to continue operating the cogeneration facility or convert the plant to emergency-generator status. This report provides the results of the analysis performed by PNL for the 19 alternative scenarios. A narrative description of each scenario is provided, including information on the prime mover, electrical generating efficiency, thermal recovery efficiency, operational labor, and backup energy strategy. Descriptions of the energy and energy cost analysis, operations and maintenance (O&M) costs, emissions and related costs, and implementation costs are also provided for each alternative. A summary table presents the operational cost of each scenario and presents the result of the life-cycle cost analysis.

Parker, S.A.; Carroll, D.M.; McMordie, K.L.; Brown, D.R.; Daellenbach, K.K.; Shankle, S.A.; Stucky, D.J.

1993-12-01T23:59:59.000Z

418

Solar production of industrial process steam. Phase III. Operation and evaluation of the Johnson and Johnson solar facility. Final report, January 1, 1980-March 31, 1981  

DOE Green Energy (OSTI)

A solar facility that generates 177/sup 0/C (350/sup 0/F) process steam has been designed and constructed by Acurex Corporation and has operated for 1 yr supplying steam to the Johnson and Johnson manufacturing plant in Sherman, Texas. The facility consists of 1068 m/sup 2/ (11,520 ft/sup 2/) of parabolic trough concentrating collectors, a 18,900 1 (5000 gal) flash boiler, and an 18.6 kW (25 hp) circulating pump. In the first year of operation the system was available 97 percent of the days, and with sufficient solar radiation available it operated 70 percent of the days during this period. The measured data showed that the collector field operated at an efficiency of 25.4 percent for the year, and that at least 75 percent of the energy reaching the flash boiler was delivered to the plant as steam. A total of 309,510 kg (682,400 lb) of steam was produced by the solar facility for the first year. An analysis of the data showed that the delivered energy was within 90 to 100 percent of the predicted value. The successful completion of the first year of operation has demonstrated the technical feasibility of generating industrial process steam with solar energy.

Brink, D.F.; Kendall, J.M.; Youngblood, S.B.

1981-03-01T23:59:59.000Z

419

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

Science Conference Proceedings (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

420

Inertial Confinement Fusion quarterly report, January--March 1995. Volume 5, No. 2  

Science Conference Proceedings (OSTI)

The ICF quarterly report is published by the Inertial Confinement Fusion Program at the Lawrence Livermore National Laboratory. Topics included this quarter include: the role of the National Ignition Facility in the development of Inertial Confinement Fusion, laser-plasma interactions in large gas-filled hohlraums, evolution of solid-state induction modulators for a heavy-ion recirculator, the National Ignition Facility project, and terminal-level relaxation in Nd-doped laser material.

NONE

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility operations quarterly" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

1Q CY2010 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2010 (PDF), Facility Representative Program Performance 1Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March2010. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Highlights from this report are presented below." 1Q CY2010, Facility Representative Program Performance Indicators More Documents & Publications 1Q CY2011 (PDF), Facility Representative Program Performance Indicators

422

3Q CY2010 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2010 (PDF), Facility Representative Program Performance 3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these indicators are gathered by Field elements quarterly per Department of Energy (DOE) Standard (STD)-1063-2006, Facility Representative and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for July - September 2010 More Documents & Publications 3Q CY2011 (PDF), Facility Representative Program Performance Indicators

423

1Q CY2000 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2000 (PDF), Facility Representative Program Performance 1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report "The Facility Representative Program Performance Indicators (PIs) Quarterly Report is attached, covering the period from January 2000 to March 2000. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standard, DOE-STD-1 063, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definitions of the PIs from the Standard are also attached for your use in evaluating the data." 1Q CY2000, Facility Representative Program Performance Indicators

424

1Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2003 (PDF), Facility Representative Program Performance 1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from January to March 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. The percentage of Facility Representatives who are fully qualified reached 91% across DOE. In EM the percenage of 97%, in Sc the percentage is 95% and in NNSA the percentage is 78%. The DOE goal is 75%. Staffing levels for the three organizations continue to be below

425

3Q CY2002 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2002 (PDF), Facility Representative Program Performance 3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July to September 2002. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standards , DOE-STD-1063-2000, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definition of the PIs from the Standard are also attached for your use in evaluating the data. The percentage of fully qualified Facility Representatives in the DOE complex

426

4Q CY2002 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 (PDF), Facility Representative Program Performance 2 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (Pis) Quarterly Report Covering the Period from October to December 2002. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. The format of the report is changed from past reports. Information will now be provided according to the major offices having field or site office Facility Representative programs: National Nuclear Security Administration (NNSSA), the Office of

427

4Q CY2001 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2001 (PDF), Facility Representative Program Performance 4Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from October to December 2001. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standards , DOE-STD-1063, and reported to Headquarters Program Offices for evaluation and feedback in order to improve the Facility Representative Program. The definition of the PIs from the Standard are also attached for your use in evaluating the data 4Q CY2001, Facility Representative Program Performance Indicators More Documents & Publications

428

Chemical vapor deposition growth. Quarterly report No. 1  

DOE Green Energy (OSTI)

The activities of the first quarter of the contract, which began December 29, 1975, are described. An existing laboratory-type CVD reactor system with a vertical deposition chamber has been used for growth of the Si films studied to date. Extensive modifications of this system, involving mass flow controllers and automatic timing of reactant gas flows by means of solenoid-activated air-operated bellows valves, will be completed early in the second quarter. (WDM)

Ruth, R.P.; Manasevit, H.M.; Kenty, J.L.; Moudy, L.A.; Simpson, W.I.; Yang, J.J.

1976-03-31T23:59:59.000Z

429

Strategic Petroleum Reserve quarterly report  

SciTech Connect

This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

1993-08-15T23:59:59.000Z

430

Coal Combustion Science quarterly progress report, April--June 1990  

SciTech Connect

This document provides a quarterly status report of the Coal Combustion Science Program that is being conducted at the Combustion, Research Facility, Sandia National Laboratories, Livermore, California. Coal devolatilization, coal char combustion, and fate of mineral matter during coal combustion. 56 refs., 25 figs., 13 tabs.

Hardesty, D.R. (ed.); Baxter, L.L.; Fletcher, T.H.; Mitchell, R.E.

1990-11-01T23:59:59.000Z

431

MHD electrode development. Quarterly report, April-June 30, 1980  

DOE Green Energy (OSTI)

Emphasis within this program is now being directed towards the engineering development of cold metallic electrodes, and in particular the identification and evaluation of alternatives to platinum for use as anodes. A literature search, concentrating on hot corrosion resistant alloys, has been undertaken and results are presented. In addition, results of platinum-copper diffusion studies and a preliminary evaluation of sputter coated specimens of TiB/sub 2/ clad copper are reported. Laboratory anode arc erosion studies have continued. A number of modifications incorporated in the test setup are described. This modified test arrangement has been used to obtain comparative data on a number of potential anode metal alloys. Further work is required to refine the test, particularly to provide a reliable method of applying corrodent to the specimens under test. No significant laboratory electrochemical corrosion tests were completed during this reporting period. Facility test operations were suspended upon completion of WESTF Test 49 during the prior quarter to permit basic facility modifications in support of the addition of a 3 Tesla magnet. The status of design, procurement and modification activities is presented.

Sadler, J W; Dietrick, D L; Frantti, E W

1980-08-01T23:59:59.000Z

432

Microsoft PowerPoint - quarterly_1040311.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Review Review March 11, 2004 C Mod Alcator - C Mod Alcator - Agenda * Status of JOULE milestones and quarterly sub- milestones (due March 31, 2004) - Comparison of single-null, double-null, inner-wall- limited ... (Marmar) - Design of ICRF antenna (Marmar) - Research operation weeks (Irby) * Lower hybrid status (Irby) * Operations plans (Irby) * Recent 2-frequency ITB results (Marmar) C Mod Alcator - JOULE Milestone SC6-1b * Compare energy confinement, H-Mode thresholds, and diverter particle dynamics in single-null, double-null and inner-wall-limited discharges ... - Quarterly sub-milestone: assess energy confinement in double-null discharges (March 31, 2004) * Status - Runs taken to compare single-null and double-null confinement - First limiter H-modes achieved (both lower nose and inner-wall limited), thresholds measured

433

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS FIGURE S-1 Regional Map of the Portsmouth, Ohio, Site Vicinity Summary S-18 Portsmouth DUF 6 Conversion Final EIS FIGURE S-3 Three Alternative Conversion Facility Locations within the Portsmouth Site, with Location A Being the Preferred Alternative (A representative conversion facility footprint is shown within each location.) Summary S-20 Portsmouth DUF 6 Conversion Final EIS FIGURE S-4 Conceptual Overall Material Flow Diagram for the Portsmouth Conversion Facility Summary S-21 Portsmouth DUF 6 Conversion Final EIS FIGURE S-5 Conceptual Conversion Facility Site Layout for Portsmouth Summary S-25 Portsmouth DUF 6 Conversion Final EIS FIGURE S-6 Potential Locations for Construction of a New Cylinder Storage Yard at Portsmouth

434

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paducah DUF Paducah DUF 6 Conversion Final EIS FIGURE S-1 Regional Map of the Paducah, Kentucky, Site Vicinity Summary S-18 Paducah DUF 6 Conversion Final EIS FIGURE S-3 Three Alternative Conversion Facility Locations within the Paducah Site, with Location A Being the Preferred Alternative (A representative conversion facility footprint is shown within each location.) Summary S-20 Paducah DUF 6 Conversion Final EIS FIGURE S-4 Conceptual Overall Material Flow Diagram for the Paducah Conversion Facility Summary S-21 Paducah DUF 6 Conversion Final EIS FIGURE S-5 Conceptual Conversion Facility Site Layout for Paducah Summary S-28 Paducah DUF 6 Conversion Final EIS FIGURE S-6 Areas of Potential Impact Evaluated for Each Alternative Alternatives 2-7 Paducah DUF 6 Conversion Final EIS

435

ARM - NSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The...

436

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983  

DOE Green Energy (OSTI)

In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

None

1983-01-01T23:59:59.000Z

437

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984  

DOE Green Energy (OSTI)

At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

None

1984-01-01T23:59:59.000Z

438

Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983  

DOE Green Energy (OSTI)

In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating the location of currently operating facilities is provided as Figure A. Of the 240 signed contracts and committed projects, 75 were cogeneration, solid waste, or biomass projects with a potential of 740 MW. PG and E also had under active discussion 32 cogeneration projects that could generate a total of 858 MW to 921 MW, and 10 solid waste/biomass projects with a potential of 113 MW to 121 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contract