1

Draft Supplemental Programmatic Environmental Impact Statement on Stockpile Stewardship and Management for a Modern Pit Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modern Pit Facility Draft Environmental Impact Statement Modern Pit Facility Draft Environmental Impact Statement xii ACRONYMS AND ABBREVIATIONS AC/MC Analytical Chemistry and Materials Characterization ACHP Advisory Council on Historic Preservation ALARA as low as reasonably achievable ALOHA Aerial Location of Hazardous Atmospheres AQCR Air Quality Control Region ARF airborne release fraction Bison-m Biota Information System of New Mexico BLM Bureau of Land Management BLS Bureau of Labor Statistics BNM Bandelier National Monument CAA Clean Air Act CAIRS Computerized Accident/Incident Reporting System CD-0 critical decision on mission need CEQ Council on Environmental Quality CFR Code of Federal Regulations CGTO Consolidated Group of Tribes and Organizations

2

Draft Environmental Impact Statement for the COB Energy Facility  

SciTech Connect

COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Corporation (PERC), proposes to construct a natural gas-fired, combined-cycle electric generating plant near Bonanza, Oregon. The Energy Facility would have a nominal generation capacity of 1,160 megawatts (MW). Electric power from the Energy Facility would enter the regional grid at the Bonneville Power Administration's (BPA's) Captain Jack Substation via a proposed 7.2-mile electric transmission line. BPA must decide whether to grant the interconnection required to connect this proposed transmission line to the Captain Jack Substation. In addition, the proposed transmission line would cross some Federal lands. The Bureau of Land Management (BLM) must decide whether to grant the necessary rights-of-way for the transmission line on approximately 44 acres of BLM land. Accordingly, BPA as the lead agency and BLM as the cooperating agency have prepared this environmental impact statement (EIS) to fulfill the requirements of the National Environmental Policy Act (NEPA). Electrical consumers in the Pacific Northwest and western states need increased power generation to serve increasing demand, and high-voltage transmission service to deliver that power. BPA will grant the interconnection if it will help to provide an adequate and reliable power supply for the region, consistent with BPA's environmental, social, and economic responsibilities. BPA intends to act consistently with its Open Access Transmission Tariff in considering the interconnection request. BLM will grant the rights-of-way if they will authorize appropriate uses of public land consistent with applicable planning documents.

N /A

2003-11-28T23:59:59.000Z

3

Public Hearing, DOE Release of DUF6 Conversion Facility Draft Environmental Impact Statements  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 UNITED STATES DEPARTMENT OF ENERGY 2 PUBLIC HEARING 3 4 SUBJECT: DOE Release of DUF6 Conversion 5 Facility Draft Environmental Impact Statements 6 DATE: January 13, 2004 7 LOCATION: Department of Energy 8 Environmental Information Center 115 Memorial Drive 9 Paducah, Kentucky 42001 10 TIME: 6:00 p.m. to 9:00 p.m. 11 FACILITATOR: Darryl Armstrong 12 REPORTED BY: Amy S. Caronongan, RPR, CSR 13 14 15 16 17

4

EA-1917: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable Energy...

5

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PADUCAH, KENTUCKY, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Paducah DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

6

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PORTSMOUTH, OHIO, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Portsmouth DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

7

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network (OSTI)

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

8

EA-1917: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for...

9

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California October 1999 [This page intentionally left blank.] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS CONTACT: For additional information on For general information on the NEPA this statement write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-293 Office of NEPA Policy and Assistance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW

10

EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

11

Secretarial Review Draft Environmental Assessment/  

E-Print Network (OSTI)

Secretarial Review Draft Environmental Assessment/ Regulatory Impact Review/Initial Regulatory review draft Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis Flexibility Analysis For the Arctic Fishery Management Plan And Amendment 29 to the Fishery Management Plan

12

EA-1906: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

13

Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

14

EIS-0383: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Orlando Gasification Project To Provide Cost-Shared Funding for Construction and Operation of Facilities...

15

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

16

EIS-0349: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. Approximately 195 acres of undeveloped land would be converted for the cogeneration facility; gas, water, wastewater, and steam pipelines; construction laydown areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic benefits of the proposed action, and identifies mitigation measures to compensate for the unavoidable impacts. Alternative

17

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

18

EIS-0222: Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

19

EIS-0333: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

EIS-0333: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental...

20

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

22

EIS-0423: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE proposes to construct one or more new facilities and/or select one or more existing facilities (including modification as needed) for the long-term management and storage of mercury, as mandated by Section 5 of the Act. Any such facility must comply with applicable requirements of Section 5 of the Act, "Management Standards for a Facility," including the requirements of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901 et seq.) and other permitting requirements. Draft Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement, DOE/EIS-0423D (January 2010)

23

EIS-0340: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project To assist in the conservation and recovery of Chinook salmon native to the Grande Ronde River and Imnaha River subbasins, the Proposed Action of updating and modifying two existing hatcheries and constructing three new hatchery facilities at other sites is being studied in this Draft Environmental Impact Statement (Draft EIS). BPA proposes to fund the capital improvements and the operation and maintenance of all five facilities to aid BPA's efforts to mitigate and recover anadromous fish affected by the Federal Columbia River Power System. The Lower Snake River run of spring/summer chinook was listed as threatened under the Endangered

24

EA-1891: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91: Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft...

25

EIS-0288-S1: Draft Supplemental Environmental Impact Statement...  

Energy Savers (EERE)

Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft...

26

EA-1954: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

4: Draft Environmental Assessment 4: Draft Environmental Assessment EA-1954: Draft Environmental Assessment Resumption of Transient Testing of Nuclear Fuels and Materials at the Idaho National Laboratory, Idaho This EA evaluates the potential environmental impacts associated with DOE's proposed action to resume transient testing at INL's Transient Reactor Test Facility reactor approximately 38 miles west of Idaho Falls, Idaho or to start transient testing at SNL's Annular Core Research Reactor in Albuquerque, New Mexico. The draft EA identifies INL as the preferred location and describes DOE's reasons for identifying INL as the preferred location. EA-1954-DEA-2013.pdf More Documents & Publications EIS-0281: Draft Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement

27

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

28

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement

29

EA-1806: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Environmental Assessment 6: Draft Environmental Assessment EA-1806: Draft Environmental Assessment Libman Company Wind Energy Project Arcola, Douglas County, Illinois The U.S. Department of Energy (DOE) has provided a grant to the State of Illinois and is proposing to authorize the expenditure of Federal funding to design, permit, and construct the Libman Wind Energy Project, a proposed 1.5 megawatt (MW) wind turbine to be located north of the Libman manufacturing facility in Arcola, Douglas County, Illinois. Draft Environmental Assessment for the Libman Company Wind Energy Project Arcola, Douglas County, Illinois, DOE/EA-1806 (November 2010) More Documents & Publications EA-1804: Final Environmental Assessment EA-1859: Final Environmental Assessment EA-1818: Final Environmental Assessment

30

EIS-0287: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0287: Draft Environmental Impact Statement Idaho High-Level Waste & Facilities Disposition This EIS evaluates the potential environmental impacts of managing two waste types at the Idaho National Engineering and Environmental Laboratory, namely, high-level waste in a calcine form and liquid mixed transuranic waste (historically know as sodium bearing waste and newly generated liquid waste). It also analyzes the disposition of existing and proposed high-level waste facilities after their missions have been completed. EIS-0287-DEIS-1999.pdf EIS-0287-DEIS-Figures-1999.pdf More Documents & Publications EIS-0287: Final Environmental Impact Statement EIS-0287: Idaho High-Level Waste and Facilities Disposition Final

31

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

32

EA-1581: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Draft Environmental Assessment 81: Draft Environmental Assessment EA-1581: Draft Environmental Assessment Sand Hills Wind Energy Facility Albany County, Wyoming WindEnergy, Inc. (SWE or applicant) submitted a request to the U.S. Department of the Interior, Bureau of Land Management (BLM), Rawlins Field Office for a right-of-way (ROW) on BLM-administered lands (Proposed Action). SWE proposes to construct, operate, and maintain the Sand Hills Wind Energy Facility (Facility) in Albany County, Wyoming. The Facility, which would be located approximately 30 miles west of Laramie, would have an aggregate nominal nameplate generating capacity of up to 50 megawatts (MW) of electricity and would include up to 25, 2.0-MW wind turbines.This Environmental Assessment (EA) has been prepared to analyze the

33

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

34

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

35

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S1: Draft Supplemental Programmatic Environmental Impact S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement EIS-0236: Record of Decision DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

36

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36-S1: Draft Supplemental Programmatic Environmental Impact 36-S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

37

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site  

SciTech Connect

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Portsmouth site in Ohio (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Portsmouth to a more stable chemical form suitable for use or disposal. The facility would also convert the DUF{sub 6} from the East Tennessee Technology Park (ETTP) site near Oak Ridge, Tennessee. In a Notice of Intent (NOI) published in the Federal Register on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (United States Code, Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (Code of Federal Regulations, Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a Federal Register Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Portsmouth site; from the transportation of all ETTP cylinders (DUF{sub 6}, low-enriched UF6 [LEU-UF{sub 6}], and empty) to Portsmouth; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). An option of shipping the ETTP cylinders to Paducah is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Portsmouth and ETTP sites. A separate EIS (DOE/EIS-0359) evaluates potential environmental impacts for the proposed Paducah conversion facility.

N /A

2003-11-28T23:59:59.000Z

38

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

SciTech Connect

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). Although not part of the proposed action, an option of shipping all cylinders (DUF{sub 6}, low-enriched UF{sub 6} [LEU-UF{sub 6}], and empty) stored at the East Tennessee Technology Park (ETTP) near Oak Ridge, Tennessee, to Paducah rather than to Portsmouth is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Paducah site. A separate EIS (DOE/EIS-0360) evaluates the potential environmental impacts for the proposed Portsmouth conversion facility.

N /A

2003-11-28T23:59:59.000Z

39

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Paducah DUF 6 DEIS: December 2003 SUMMARY S.1 INTRODUCTION This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the Federal Register (FR) on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth,

40

EIS-0312: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EA-1955: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1955-DEA-2014.pdf More Documents & Publications EA-1902: Draft Environmental Assessment EA-1689: Final Environmental Assessment EIS-0485: Draft Environmental Impact Statement...

42

EIS-0382: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 606 megawatts of electricity (MWe) for export to the electrical grid, 1,212 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

43

EIS-0360: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed DUF6 conversion facility at three

44

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

45

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

46

EA-1640: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1640: Draft Environmental Assessment EA-1640: Draft Environmental Assessment EA-1640: Draft Environmental Assessment Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee The proposed action evaluated in this Environmental Assessment (EA) is the conveyance (lease, easement, and/or title transfer) of U. S. Department of Energy (DOE) property located at the East Tennessee Technology Park (ETTP) and surrounding area for mixed use economic development. Leases, easements, and/or title transfers could be entered into with the Community Reuse Organization of East Tennessee (CROET), city of Oak Ridge, other agencies, or private entities. Environmental Assessment for Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee,

47

EA-1640: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1640: Draft Environmental Assessment Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee The proposed action evaluated in this Environmental Assessment (EA) is the conveyance (lease, easement, and/or title transfer) of U. S. Department of Energy (DOE) property located at the East Tennessee Technology Park (ETTP) and surrounding area for mixed use economic development. Leases, easements, and/or title transfers could be entered into with the Community Reuse Organization of East Tennessee (CROET), city of Oak Ridge, other agencies, or private entities. Environmental Assessment for Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee,

48

EIS-0385: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0385: Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve As required by the Energy Policy Act of 2005 (P.L. 109-58), DOE would expand the SPR to its full authorized 1 billion-barrel capacity by selecting additional storage sites. DOE would develop one new site or a combination of two new sites, and would expand capacity at two or three existing sites. Storage capacity would be developed by solution mining of salt domes and disposing of the resulting salt brine by ocean discharge or underground injection. New pipelines, marine terminal facilities, and other infrastructure could also be required. DOE has prepared this draft EIS to address the environmental impacts of the proposed expansion of the capacity

49

EIS-0359: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0359: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site DOE/EIS-0359, Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site, 68 FR 66825 (November 2003) More Documents & Publications EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact

50

EIS-0418: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project, Deer Creek Station Energy Facility Project, Brookings County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to provide interconnection services, and Rural Utilities Service (RUS) proposes to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility. The facility is being proposed to meet projected intermediate demands for electricity in the eastern portion of Basin Electric Power Cooperative's service territory, as determined from a power supply analysis. Basin Electric's alternatives analysis included alternative power generation

51

EIS-0305: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Impact Statement 5: Draft Environmental Impact Statement EIS-0305: Draft Environmental Impact Statement Treating Transuranic/Alpha Low-Level Waste at the Oak Ridge National Laboratory This EIS evaluates the potential environmental impacts of a proposal to construct, operate, and decontaminate/decommission a TRU Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-levelwaste solids. The mixed sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste.

52

EA-1752: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

52: Draft Environmental Assessment 52: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

53

EA-1752: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

752: Draft Environmental Assessment 752: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

54

EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. This CMRR-NF SEIS examines the potential environmental impacts associated with NNSA's proposed

55

Draft Addendum to Environmental Review Documents Concerning Exports...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States Draft Addendum to Environmental Review Documents Concerning Exports of...

56

EA-1932: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

57

EA-1861: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to...

58

EA-1922: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Environmental Assessment EA-1922: Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska This DOE Draft EA, in cooperation with RUS and the...

59

EIS-0460: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois The Environmental Protection Agency (EPA) announces the availability of the Draft EIS...

60

EIS-0376: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1809: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN This EA evaluates the potential...

62

Public Invited to Comment on Draft Environmental Assessment for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental...

63

EA-1923: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA...

64

EIS-0350: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

65

EIS-0325: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft Environmental...

66

EIS-0279: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

9: Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

67

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact...  

Office of Environmental Management (EM)

Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the...

68

EIS-0375: EPA Notice of Availability of the Draft Environmental...  

Energy Savers (EERE)

375: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of...

69

EIS-0507: Draft Environmental Impact Statement | Department of...  

Energy Savers (EERE)

7: Draft Environmental Impact Statement EIS-0507: Draft Environmental Impact Statement The Bureau of Land Management and the U.S. Forest Service issued, with DOE's Bonneville Power...

70

EIS-0486: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers (EERE)

EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line...

71

EIS-0306: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

72

EIS-0441: EPA Notice of Availability of a Draft Environmental...  

Energy Savers (EERE)

41: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0441: EPA Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm...

73

EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...  

Office of Environmental Management (EM)

Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

74

EIS-0424: EPA Notice of Availability of the Draft Environmental...  

Energy Savers (EERE)

424: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0424: EPA Notice of Availability of the Draft Environmental Impact Statement Klickitat Hatchery...

75

EIS-0271: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

76

EIS-0082-S2: Draft Environmental Impact Statement | Department...  

Energy Savers (EERE)

S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

77

EIS-0423: DOE Notice of Availability of the Draft Environmental...  

Office of Environmental Management (EM)

Draft Environmental Impact Statement and Notice of Public Hearings EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings...

78

EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management The Department of Energy (DOE) announces the availability of the Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility(NIF) Project Specific Analysis portion (Volume III, Appendix I) of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS) DOE/EIS-0236-S1 for public review and comment. EIS-0236-S1-NOA_DEIS-1999.pdf More Documents & Publications EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

79

EIS-0319: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

319: Draft Environmental Impact Statement 319: Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated relocateing the TA-18 security Category I/II capabilities and materials to new locations: 1) different site at LANL (the preferred alternative) at Los Alamos, New Mexico; 2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; 3) the Nevada Test Site near Las Vegas; and 4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS analyzes upgrading of the TA-18 facilities at LANL. EIS-0319-DEIS-2001.pdf More Documents & Publications EIS-0319: Final Environmental Impact Statement EIS-0319: Record of Decision EIS-0236-S4: Final Supplemental Programmatic

80

EA-1901: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Assessment 1: Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to support the Kootenai Tribe of Idaho's construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort. EA-1901-DEA-2013.pdf More Documents & Publications EA-1901: Final Environmental Assessment EA-1901: Finding of No Significant Impact EA-1901: Mitigation Action Plan

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EA-1863: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1863: Draft Environmental Assessment Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest Flagstaff, Arizona Comment Period Ends: 12/29/11 For more information, contact: Ms. Linette King Electronic mail: lking@wapa.gov The Glen Canyon to Pinnacle Peak 345 kV vegetation management and right-of-way maintenance project (Project) serves to update the existing operation and maintenance program to include all transmission facilities and access roads into one comprehensive and proactive vegetation management and right-of-way maintenance program (Program). This environmental assessment (EA) analyzes the potential environmental consequences of the proposed Project, as required under the National

82

EIS-0440: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0440: Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment (November 2011) Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and

83

EIS-0397: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to habitat in the upper part of the watershed. Funding from BPA would serve to provide off-site mitigation for the effects of the federal Columbia River hydroelectric facilities on fish populations by improving fish passage at Lyle Falls. While the fish passage issues at Lyle Falls were not caused by the hydroelectric facilities, this project would help BPA meet its mitigation responsibilities and potentially increase overall fish production in the Columbia Basin by enhancing fish passage into the Klickitat subbasin. EIS-0397-DEIS-Summary-2008.pdf EIS-0397-DEIS-2008.pdf More Documents & Publications

84

EIS-0286: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide capabilities to continue, or modify, the way it treats, stores, and/or disposes of existing and anticipated quantities of solid LLW, MLLW, TRU waste, and ILAW at the Hanford Site in order to protect human health and the environment; facilitate cleanup at Hanford and other DOE facilities; take actions consistent with decisions reached by DOE under the WM PEIS; comply with local, State, and federal laws and regulations; and meet other obligations such as the Hanford Federal Facility Agreement and Consent Order (also referred to as the Tri-Party Agreement, or TPA) (Ecology et al. 1989).

85

DRAFT ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/  

E-Print Network (OSTI)

DRAFT ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ INITIAL REGULATORY FLEXIBILITY ANALYSIS: This Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis (EA For Amendments to the Fishery Management Plan (FMP) for Groundfish of the Bering Sea and Aleutian Islands

86

EA-1851: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1851: Draft Environmental Assessment Delphi Automotive Systems, LLC, Electric Drive Vehicle Battery and Component Manufacturing Initiative For more information, contact: Ms. Pierina Fayish U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, MS: 922-M217 Pittsburgh, PA 15236 Fax: 412-386-4775 Electronic mail: pierina.fayish@netl.doe.gov DOE prepared this EA to evaluate the potential environmental consequences of providing a financial assistance grant under the American Recovery andReinvestment Act of 2009 (ARRA) to Delphi Automotive Systems, Limited Liability Corporation (LLC) (Delphi). Delphi proposes to construct a laboratoryreferred to as the "Delphi Kokomo, IN Corporate Technology Center" (Delphi CTC Project) and retrofit a manufacturing facility. The

87

EIS-0413: EPA Notice of Availability of a Draft Environmental...  

Office of Environmental Management (EM)

EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the...

88

EIS-0486: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the potential...

89

Federal Register Notice for Draft Addendum to Environmental Review...  

Energy Savers (EERE)

Notice for Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States Federal Register Notice for Draft Addendum to...

90

EIS-0409: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Draft Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project, Mississippi Notice of Availability for the Draft...

91

EIS-0483: EPA Notice of Availability of Draft Environmental Impact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EPA announced the availability of a draft...

92

EIS-0447: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers (EERE)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to...

93

EIS-0487: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0487: Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission...

94

EA-1931: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

95

EA-1860: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

96

EA-1860: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

97

EA-1769: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1769: Draft Environmental Assessment Battleground Energy Recovery Project Harris County, Texas The proposed project is consistent with DOE's goal of increased use of energy efficiency and renewable energy generation projects. The proposed project involves installation of a specifically designed waste heat recovery boiler on the existing kiln afterburner of an incineration unit at the CHDP facility. This boiler would use heat from the incinerator flue gases to generate high pressure superheated steam. The adjacent Dow Chemical plant would periodically consume part of the steam for process needs, replacing natural gas firing of existing boilers. The majority of the steam, however, would be piped to a new steam turbine-generator (STG).

98

EIS-0357: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: DOE Notice of Availability of the Draft Environmental 7: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0357: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability of the document, Draft Environmental Impact Statement for the Gilberton Coal to-Clean Fuels and Power Project (DOE/EIS-0357), for public comment. The draft environmental impact statement (EIS) analyzes the potential environmental consequences of providing federal funding for the design, engineering, construction, and operation of the first power facility in the United States to use coal waste as feed to a gasification facility that subsequently generates fuel gas for clean power, thermal energy, and clean

99

CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAMERON LIQUEFACTION PROJECT CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................... ES-1 PROPOSED ACTION ............................................................................................................... ES-1 PUBLIC INVOLVEMENT ....................................................................................................... ES-3 PROJECT IMPACTS ................................................................................................................ ES-3 ALTERNATIVES CONSIDERED ........................................................................................... ES-7 CONCLUSIONS ....................................................................................................................... ES-8

100

UK FT PDU Facility Draft EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2S 2S Draft Supplemental Environmental Assessment for University of Kentucky Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis Lexington, KY December 2013 Prepared for: Department of Energy National Energy Technology Laboratory This page intentionally left blank. Draft Supplemental Environmental Assessment DOE/EA-1642S Fischer-Tropsch Process Development Unit December 2013 Cover Sheet Proposed Action: The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with the University of Kentucky (UK) Center for Applied Energy Research (CAER), to partially fund the completion of the design, construction, and operation of a small-scale pilot plant for research related to the gasification of coal

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE/EA-1697 Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment for Right-of-Way Maintenance in the San Joaquin Valley, California June 2010 Prepared for: Western Area Power Administration, Sierra Nevada Region San Joaquin Valley ROW Maintenance EA June 2010 iii Draft EA CONTENTS 1.0 PURPOSE AND NEED FOR ACTION ...................................................................... 1-1 1.1 Introduction ............................................................................................. 1-1 1.2 Background ............................................................................................. 1-1 1.3 Purpose and Need for Action .................................................................. 1-3 1.4 Location and Project Area Description .................................................... 1-4

102

EIS-0375: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOE/EIS-0375, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste, Proposed Development, Operation, and Long-Term Management of a Disposal Facility, 76 FR 10584 (February 2011) More Documents & Publications EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0434: Notice of Cancellation of an Environmental Impact Statement EIS-0439: EPA Notice of Availability of the Draft Environmental Impact

103

EIS-0387: Draft Site-Wide Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Site-Wide Environmental Impact Statement Draft Site-Wide Environmental Impact Statement EIS-0387: Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The NNSA, a separately organized agency within the DOE, has the responsibility to maintain the safety, reliability, and security of the U.S. nuclear weapons stockpile to meet national security requirements. NNSA manages nuclear weapons programs and facilities, including those at the Y-12 National Security Complex (Y-12) at Oak Ridge, Tennessee. This Draft Y-12 SWEIS analyzes the potential environmental impacts of reasonable alternatives for ongoing and foreseeable future operations, facilities, and activities at Y-12. EIS-0387-DEIS-Summary-2009.pdf Draft Site-Wide Environmental Impact Statement for the Y-12 National

104

Notice of Availability for the National Ignition Facility Draft Supplemental Environmental Impact Statement (11/5/99)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30 30 Federal Register / Vol. 64, No. 214 / Friday, November 5, 1999 / Notices natural or human environment. Because no significant environmental impacts will result from implementation of the proposed action, an Environmental Impact Statement is not required and will not be prepared. The Army will not initiate the proposed action for 15 days following the completion of the EA and FNSI and publication of a public notice in a local newspaper. This EA is available for review at the following repositories: Lassen Community College Library, Highway 139, P.O. Box 3000, Susanville, CA 96130; Lassen County Public Works, 707 Nevada Street, Suite 2, Susanville, CA 96130; and the Washoe County Library, Downtown Branch, 301 South Center Street, Reno NV 89501. Dated: November 1, 1999.

105

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: EPA Notice of Availability of the Draft Environmental 1: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft

106

DOE/EIS-0287 Idaho High-Level Waste & Facilities Disposition Draft Environmental Impact Statement (December 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HLW & FD EIS HLW & FD EIS 3-13 DOE/EIS-0287D Calcine storag e i n b i n s ets Calcine storag e i n b i n s et s Cesium ion exchange & grouting Cesium ion exchange & grouting NWCF* NWCF* Calcine Mixed transuranic waste/SBW Mixed transuranic waste/NGLW Low-level waste disposa l*** disposa l*** Tank heels Transuranic waste (from tank heels) * * * * Mixed transuranic waste/ NGLW Mixed transuranic waste/ NGLW M i x e d t r a nsuran ic w a s t e / M i x e d t r a nsuran ic w a s t e / S B W s t o rage in Ta n k F a r m S B W s t o rage in Ta n k F a r m Low-leve l waste Low-leve l waste FIGURE 3-2. Continued Current Operations Alternative. LEGEND * Including high-temperature and maximum achievable control technology upgrades. Mixed transuranic waste/ newly generated liquid waste New Waste Calcining Facility ** Calcine would be transferred from bin set #1 to bin set #6 or #7.

107

EIS-0413: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the Searchlight Wind Energy Project. The EIS evaluates the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. EIS-0413-EPANOA-2012.pdf More Documents & Publications EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Final Environmental Impact Statement

108

EIS-0478: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: EPA Notice of Availability of a Draft Environmental 8: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0478: EPA Notice of Availability of a Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project EPA announces the availability of the Draft EIS for the Antelope Valley Station to Neset Transmission Project, prepared by the Rural Utility Service. This EIS evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration is a cooperating agency. EIS-0478-EPADEISNOA-2012.pdf More Documents & Publications EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0414: EPA Notice of Availability of the Draft Environmental Impact

109

EIS-0382: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN The draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of $36 million in cofunding, through a financial assistance cooperative agreement, for the design and one-year operational demonstration of a coal-based, Integrated Gasification Combined Cycle (IGCC) electric generating facility on the Iron Range of northern Minnesota. Notice of Availability of the Draft Environmental Impact Statement for the Mesaba Energy Project (DOE/EIS-0382D)(November 8, 2007)(72FR63169) More Documents & Publications

110

EIS-0413: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0413: EPA Notice of Availability of a Draft Environmental EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the Searchlight Wind Energy Project. The EIS evaluates the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. EIS-0413-EPANOA-2012.pdf More Documents & Publications EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Final Environmental Impact

111

Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

112

EIS-0340: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0340: EPA Notice of Availability of the Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project DOE/EIS-0340, Northeast Oregon Hatchery Program, Grande Ronde-Imnaha Spring Chinook Hatchery Project, To Modify and Modernize two Existing Hatchery Facilities and Construct three Auxiliary Hatchery Facilities, Wallowa County, Oregon, 68 FR 28213 (May 2003) More Documents & Publications EIS-0236-S2: EPA Notice of Availability of the Draft Supplement to the Programmatic Environmental Impact Statement EIS-0318: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact

113

EA-1919: Notice of Availability of a Draft Programmatic Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Programmatic Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating from Radiological Areas DOE announces the availability for public review and comment of the Draft Programmatic Environmental Assessment (PEA) for the Recycling of Scrap Metals Originating from Radiological Areas. This Draft PEA for the Recycling of Scrap Metals Originating from Radiological Areas analyzes the potential environmental impacts associated with resuming the clearance of scrap metal, originating from DOE radiological areas, for recycling pursuant to improved procedures designed to assure that clearance for release is limited to metals meeting stringent criteria. This Draft PEA

114

EIS-0496: Notice of Intent to Prepare a Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

6: Notice of Intent to Prepare a Draft Environmental Impact 6: Notice of Intent to Prepare a Draft Environmental Impact Statement EIS-0496: Notice of Intent to Prepare a Draft Environmental Impact Statement DOE's Western Area Power Administration announces its intent to prepare, with the Bureau of Reclamation as a cooperating agency, a joint EIS and environmental impact report to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. For the purposes of the environmental impact report under the California Environmental Quality Act (CEQA), the San Luis & Delta-Mendota Water Authority is the lead agency. EIS-0496: Notice of Intent More Documents & Publications EIS-0323: Draft Environmental Impact Statement

115

Salmon Creek Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

116

EIS-0439: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an Application...

117

EIS-0375: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Environmental Protection...

118

EA-1707: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

EA-1707: Draft Environmental Assessment Closure of Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill, Hanford Site, Richland, Washington This environmental...

119

EA-1960: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western Area...

120

EA-1896: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1896: Draft Environmental Assessment Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, ND This EA...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EA-1959: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

More Documents & Publications EIS-0425: Draft Environmental Impact Statement EIS-0425: Record of Decision and Mitigation Action Plan EIS-0425: Final Environmental Impact Statement...

122

DRAFT for Secretarial Review ENVIRONMENTAL ASSESSMENT/  

E-Print Network (OSTI)

DRAFT for Secretarial Review ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ INITIAL REGULATORY Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis (EA/RIR/IRFA) evaluates FLEXIBILITY ANALYSIS For an Amendment to the Fishery Management Plan (FMP) for Groundfish of the Bering Sea

123

Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

124

EIS-0343: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement COB Energy Facility, Proposes to Construct a 1,160-megawatt (MW) Natural Gas-Fired and Combined- Cycle Electric Generating Plant, Right- of-Way Permit across Federal Land under the Jurisdiction of BLM, Klamath Basin, Klamath County, OR DOE/EIS-0343, EPA Notice of Availability, COB Energy Facility, Proposes to Construct a 1,160-megawatt (MW) Natural Gas-Fired and Combined-Cycle Electric Generating Plant, Right-of-Way Permit cross Federal Land under the Jurisdiction of BLM, Klamath Basin, Klamath County, Oregon, 68 FR 66825 (November 2003) More Documents & Publications EIS-0359: EPA Notice of Availability of the Draft Environmental Impact

125

EIS-0375: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0375: Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Draft...

126

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

127

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chief Joseph Hatchery Program Chief Joseph Hatchery Program Draft Environmental Impact Statement DOE/EIS-0384 May 2007 Chief Joseph Hatchery Program Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Project: Chief Joseph Hatchery Program Cooperating Tribe: Confederated Tribes of the Colville Reservation State Involved: Washington Abstract: The Draft Environmental Impact Statement (DEIS) describes a Chinook salmon hatchery production program sponsored by the Confederated Tribes of the Colville Reservation (Colville Tribes). BPA proposes to fund the construction, operation and maintenance of the program to help mitigate for anadromous fish affected by the Federal Columbia River Power System dams on the Columbia River. The Colville Tribes want to produce adequate

128

EA-1705: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan The frontier Project consists of the design, construction and operation of a biorefinery producing ethanol and other co-products from cellulosic materials utilizing a proprietary pretreatment and fermentation process. Draft Environmental Assessment and Notice of Wetland Involvement for the Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan, DOE/EA-1705 (February 2011) More Documents & Publications EA-1705: Final Environmental Assessment EA-1705: Finding of No Significant Impact Pacific Ethanol, Inc

129

EIS-0285: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0285: Draft Environmental Impact Statement Bonneville Power Administration Transmission System Vegetation Management Program This EIS evaluates the potential environmental impacts of establishing Planning Steps for managing vegetaion for specific projets. Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). EIS-0285-DEIS-1999_0.pdf More Documents & Publications Report to Congress: Corridors and Rights-of-Way on Federal Lands EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement Funding for state, city, and county governments in the state includes:

130

EIS-0450: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the environmental review, also announce the availability of the Draft EIS. EIS-0450-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of Final Environmental Impact

131

EIS-0284: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

132

EIS-0284: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric...

133

EA-1903: Notice of Availability of Draft Environmental Assessment...  

Energy Savers (EERE)

of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the availablity of...

134

EIS-0413: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

Impact Statement EIS-0413: Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV The Department of the Interior's Bureau of Land...

135

EIS-0445: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0445: Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia This EIS evaluates the...

136

EIS-0403-S1: Supplement to the Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

137

EIS-0439: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and...

138

EIS-0487: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0487: EPA Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas EPA announces the availability of the...

139

EIS-0487: Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission...

140

EIS-0373: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho; (formerly known as Idaho National Engineering and Environmental Laboratory and Argonne National Laboratory-West, Idaho). DOEEIS-0373, Department of Energy, Draft...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0464: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County,...

142

EA-1972: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power Administration issued...

143

EIS-0489: EPA Notice of Availability of Draft Environmental Impact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Statement EIS-0489: EPA Notice of Availability of Draft Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

144

EIS-0489: FERC Notice of Availability of Draft Environmental...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EIS-0489: FERC Notice of Availability of Draft Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

145

EIS-0506: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a Draft EIS that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat...

146

EIS-0397: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

147

EA-1611-S1: Draft Supplemental Environmental Assessment | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a draft supplemental EA that...

148

EIS-0375: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Department of Energy,...

149

EIS-0495: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers (EERE)

Milton-Freewater, Oregon, and Dayton, Washington EPA announced the availability of Bonneville Power Administration's Draft EIS that analyzes the potential environmental...

150

EA-1945: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft EA that assesses the potential environmental...

151

EIS-0425: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA...

152

EIS-0495: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Chinook Hatchery Program; Milton-Freewater, Oregon, and Dayton, Washington Bonneville Power Administration issued a Draft EIS that analyzes the potential environmental impacts of...

153

EA-1566: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Draft Environmental Assessment Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada This notice announces the availability, and the opportunity...

154

EIS-0474: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Southline Transmission Project, Arizona and New Mexico EPA announces the availability of the Southline Transmission Project, (Arizona and New...

155

EA-1922: Notice of Availability of a Draft Environmental Assessment...  

Energy Savers (EERE)

EA-1922: Notice of Availability of a Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska DOE, in cooperation with RUS and the Denali...

156

EIS-0238: Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico

157

EA-1919: Notice of Availability of a Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating from Radiological Areas DOE announces the availability...

158

EIS-0458: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA Notice of Availability of the Draft Environmental Impact Statement and Public Hearing...

159

EA-1809: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces...

160

Public invited to comment on Draft Environmental Assessment for...  

NLE Websites -- All DOE Office Websites (Extended Search)

invited to comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials NOTICE: DOE has extended the public comment period...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0483: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado Western Area Power Administration prepared a...

162

EIS-0317-S1: Draft Supplemental Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

163

EIS-0414: DOE Notice of Availability of the Draft Environmental...  

Energy Savers (EERE)

of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of...

164

EIS-0332: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and maintain a...

165

EIS-0422: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to...

166

EIS-0414: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance, and Connection of either...

167

EIS-0505: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0505: Draft Environmental Impact Statement Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington The Bureau of...

168

EIS-0440: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Environmental the Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and ancillary facilities would be on land administered by the Bureau of Land

169

EIS-0360: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and

170

Draft Environmental Impact Statement Available for Public Review |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step forward in cleaning up the site. The document, entitled "Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D (Revised)), is a revision of the 1996 Cleanup and Closure

171

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

172

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

173

EIS-0431: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA EPA announces the availability of the Draft Environmental Impact Statement for the Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. EIS-0431-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0460: EPA Notice of Availability of Final Environmental Impact

174

Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plymouth Generating Facility Plymouth Generating Facility Plymouth, Washington Prepared by: Benton County, Washington Bonneville Power Administration (DOE/EIS 0345) June 2003 Final Environmental Impact Statement Plymouth Generating Facility To: People Interested in the Plymouth Generating Facility Enclosed is the Final EIS for the Plymouth Generating Facility. The Draft EIS was published in August 2002, and comments were received through October 5, 2002. The Final EIS contains revisions to the Draft EIS and our responses to public and agency comments on the Draft EIS. This letter briefly describes the Final EIS, outlines our next steps, and tells how to contact us if you have questions. The Final EIS is abbreviated, consisting of an updated summary and project description

175

EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact...  

Energy Savers (EERE)

80: Notice of Intent to Prepare a Draft Environmental Impact Statement EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact Statement Long-Term Experimental and...

176

EIS-0286: Revised Draft Environmental Import Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Import Statement 6: Revised Draft Environmental Import Statement EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington The revised draft of the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. DOE/EIS-0286, Richland Operations Office, Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington - Summary (March 2003) EIS-0286-D2-DEIS-01-2003.pdf EIS-0286-D2-DEIS-02-2003_0.pdf More Documents & Publications

177

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

178

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

179

Environmental Assessment of Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

180

Public Invited to Comment on Draft Environmental Assessment for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office NOTICE: DOE has extended the public comment period on its Draft Environmental Assessment for Resumption of Transient Testing of Nuclear Fuels and Materials to January 10, 2014. The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EA-1814: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1814: Draft Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System, Montpelier, Vermont The U.S. Department of Energy (DOE) is proposing to provide Federal funding through the Community Renewable Energy Deployment Program to the City of Montpelier for the design, permitting, and construction of a combined heat and power (CHP) and district energy system. This Draft EA analyzes the foreseeable environmental impacts of the proposed project and the alternative of not implementing this project (the No-Action Alternative), including the construction of a new heat plant and district energy system within a 100 year floodplain. Draft Environmental Assessment for City of Montpelier Combined Heat and

182

EIS-0442: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

2: EPA Notice of Availability of Draft Environmental Impact 2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska. EIS-0442-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0389: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

183

EIS-0442: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah This Draft EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. It evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx EIS-0442: Draft Environmental Impact Statement More Documents & Publications

184

UK FT PDU Facility Draft EA  

NLE Websites -- All DOE Office Websites (Extended Search)

Process Development Unit Facility February 2014 The facility is sized as a small-scale pilot CBTL plant that would produce research quantities of FT liquid fuels at...

185

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

186

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 11:31am Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

187

EA-1889: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Draft Environmental Assessment 9: Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the Navy has prepared a Draft Environmental Assessment (EA) on the Disposal of Decommissioned, Defueled, Naval Reactor Plants from the USS Enterprise. The world's first nuclear-powered naval aircraft carrier, Enterprise, is scheduled for decommissioning in 2013, following 51 consecutive years of service. Because the preferred alternative is to dispose of the Enterprise reactor plants at the Department of Energy's Hanford Site*, the Department of Energy is a cooperating agency for this EA. For additional information on the Draft Enterprise EA, please contact Mary Mascianica at (360) 476-7111.

188

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 4:31pm Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

189

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to

190

EA-1592: Extension of Comment Period of the Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period of the Draft Environmental Extension of Comment Period of the Draft Environmental Assessment EA-1592: Extension of Comment Period of the Draft Environmental Assessment Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant In the interest of maximizing public participation, GSA and NNSA are extending the public comment period until Wednesday, January 30, 2008. The United States General Services Administration (GSA) and the United States Department of Energy's National Nuclear Security Administration (NNSA) will prepare an Environmental Assessment (EA), DOE/EA-1592, to relocate certain non-nuclear component production and procurement activities currently conducted at NNSA's Kansas City Plant (KCP) to a smaller new

191

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

192

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

193

EA-1792: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This EA evaluates the environmental impacts of the Proposed Action and the No-Action Alternative; identifies unavoidable adverse environmental impacts of the Proposed Action; describes the relationship between local short-term uses of the environment and the maintenance and enhancement of long-term productivity; and characterizes any irreversible and irretrievable commitments of resources that would be involved should DOE decide to implement its Proposed Action. Draft Environmental Assessment for University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, DOE/EA-1792 (May

194

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

195

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

196

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

197

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

198

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

199

Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.  

SciTech Connect

This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

200

EIS-0396: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Programmatic Environmental Impact Statement 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained production of nuclear-generated electricity, while reducing the impacts associated with spent nuclear fuel disposal and reducing proliferation risks. The Department of Energy (DOE) proposed action envisions changing the United States nuclear energy fuel cycle from an open (or once-through) fuel

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY S-1 SUMMARY This environmental impact statement (EIS) has been prepared by the United States Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement manufacturing facility (the "Co- Production Facility"). The responsible organization for the federal action is the National Energy Technology Laboratory (NETL), a multi-purpose laboratory owned and operated by DOE. Proposed Action The Proposed Action is for DOE to decide whether to provide financial assistance to Western

202

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

203

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0447: DOE Notice of Availability of Draft Environmental Impact EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

204

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

606: Draft Environmental Assessment 606: Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

205

EIS-0355: EPA Notification of Availability of the Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notification of Availability of the Draft EPA Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

206

EIS-0444: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

207

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

208

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of Draft Environmental Impact DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

209

EIS-0464: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture and Sequestration (ICCS) Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60

210

EA-1080: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1080: Draft Environmental Assessment Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System This environmental assessment (EA) evaluates the potential impacts of a proposed demonstration project to be cost-shared by DOE and NOXSO Corporation under the terms of Clean Coal Technology (CCT) Demonstration Program. The project would demonstrate the NOXSO flue gas treatment technology, which is designed to reduce sulfur dioxide (SO2) and nitrogen oxides (NOX) emissions from existing coal-fired electric generating units. Draft Environmental Assessment for the Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications EA-1080: Finding of No Significant Impact

211

Public Invited to Comment on Draft Environmental Assessment for Replacement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site September 1, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

212

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

213

EA-1912: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

214

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

215

EA-1948: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1948: Draft Environmental Assessment Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. EA-1948-DEA-2013.pdf More Documents & Publications CX-007149: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination

216

EIS-0488: FERC Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

88: FERC Draft Environmental Impact Statement 88: FERC Draft Environmental Impact Statement EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

217

Public Invited to Comment on Draft Environmental Assessment for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National Laboratory (INL) or Sandia National Laboratories (SNL). Transient testing involves placing fuel or material into the core of a nuclear reactor and subjecting it to short bursts of intense, high-power

218

EA-1867: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1867: Draft Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE prepared this Draft EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's total $171.8 million funding for the proposed project would be provided from funds authorized in the American Recovery and Reinvestment Act of 2009 (Public Law 111-5, 123 Stat. 115). RTI's

219

EIS-0336: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the proposed action and reasonable alternatives, including the "No Action" alternative. In addition, because the U.S. Forest Service, the Bureau of Land Management, and the U.S. International Boundary Water Commission (USIBWC) must act, and because their actions are

220

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0435: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0435: Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to modify its interconnection agreement with Basin Electric for the Groton Generation Station to eliminate Western's 50-megawatts (MW) annual average operating limit. The Groton Generation Station is located about 5 miles south of Groton, South Dakota. Basin Electric needs to eliminate the operating limit to help serve increased load demand for electric power in the eastern portion of its service area Western Area Power Administration Draft Environmental Impact Statement

222

NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ), incollaboration with the California Governors Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

223

Secretarial Review Draft Regulatory Impact Review/Environmental Assessment/  

E-Print Network (OSTI)

Secretarial Review Draft Regulatory Impact Review/Environmental Assessment/ Initial Regulatory............................................................................................................................. 1 2.0 REGULATORY IMPACT REVIEW Flexibility Analysis for Proposed Amendment 92 to the Fishery Management Plan for Groundfish of the Bering Sea

224

EIS-0473: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX EPA announces the availability...

225

EIS-0365: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV...

226

EIS-0399: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct,...

227

Draft Environmental Impact Statement for the Disposal of Greater...  

NLE Websites -- All DOE Office Websites (Extended Search)

Friday, February 18, 2011 Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste WASHINGTON The...

228

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Impact Statement 8: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

229

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

230

EA-1697: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1697: Draft Environmental Assessment Right-of-Way Maintenance in the San Joaquin Valley, California The Western Area Power Administration (Western) Sierra Nevada Region is a power marketing administration of the U.S. Department of Energy (DOE). As a Federal entity, Western is responsible for examining the potential environmental consequences of its proposed actions prior to making a decision or commitment to implement an action (see Section 1.5 for more information). This Environmental Assessment (EA) evaluates environmental impacts of the Proposed Action (San Joaquin Valley Right-of-Way Maintenance Project) and the No Action Alternative. EA-1697-DEA-2010.pdf More Documents & Publications EA-1697: Final Environmental Assessment

231

EIS-0451: Supplemental Draft Environmental Impact Statement ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an additional...

232

Transcript of Public Hearing on DUF6 Conversion Facility Draft EISs, Held Jan. 7, 2004, Waverly, Ohio  

NLE Websites -- All DOE Office Websites (Extended Search)

- - - - - - Draft Environmental Impact Statements For the Construction and Operation of Depleted Uranium Hexafluoride Conversion Facilities at the Paducah, Kentucky and Portsmouth, Ohio Sites - - - PUBLIC HEARING JANUARY 7, 2004 - - - LOCATION: Pike County YMCA 400 Pride Drive Waverly, Ohio TIME: 6:00

233

EIS-0236-SA6; Draft Supplemental Analysis: Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile, Stewardship  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/25/99 6/25/99 DRAFT SUPPLEMENT ANALYSIS: PIT MANUFACTURING FACILITIES AT LOS ALAMOS NATIONAL LABORATORY, STOCKPILE STEWARDSHIP AND MANAGEMENT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT June 1999 SUMMARY ............................................................................................................................... 3 INTRODUCTION ..................................................................................................................... 3 Purpose of this Document .................................................................................................................................. 3 Background - SSM PEIS ...................................................................................................................................

234

EIS-0288: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0288: Draft Environmental Impact Statement This Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (CLWR EIS) evaluates the environmental impacts associated with producing tritium at one or more of the following five CLWRs: (1) Watts Bar Nuclear Plant Unit 1 (Spring City, Tennessee); (2) Sequoyah Nuclear Plant Unit 1 (Soddy Daisy, Tennessee); (3) Sequoyah Nuclear Plant Unit 2 (Soddy Daisy, Tennessee); (4) Bellefonte Nuclear Plant Unit 1 (Hollywood, Alabama); and (5) Bellefonte Nuclear Plant Unit 2 (Hollywood, Alabama). Specifically, this EIS analyzes the potential environmental impacts associated with fabricating tritium-producing burnable absorber rods (TPBARs); transporting nonirradiated TPBARs from the

235

EIS-0400: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the environmental impacts of a proposal to rebuild and upgrade the Western Area Power Administration's 12-mile Granby Pumping Plant-Windy Gap 69-kV transmission line in Grand County, Colorado. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and decided to prepare an EIS instead of completing the EA. Further information about the project is available on the project website. EIS-0400-DEIS-2012.pdf More Documents & Publications EIS-0400: Final Environmental Impact Statement EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement

236

EA-1949: FERC Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. EA-1949-FERC-DEA-2013.pdf More Documents & Publications EA-1949: FERC Notice of Availability of an Environmental Assessment EA-1949: FERC Final Environmental Assessment

237

EA-1665: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1665: Draft Environmental Assessment Davis-Kingman Tap 69-kV Transmission Line Rebuild, Mohave County, Arizona This Environmental Assessment (EA) evaluates the probable and known impacts to the environment from Western's Proposed Action, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with National Environmental Policy Act (NEPA) regulations published by the Council on Environmental Quality (CEQ) (40 CFR 1500-1508) and implementing procedures of DOE (10 CFR 1021). Western is the lead federal agency responsible for preparing the EA. The Department of Interior's (DOI) Bureau of Land Management (BLM) Kingman Field Office and Reclamation's Lower Colorado Regional Office are cooperating

238

EIS-0488: Notice of Availability Draft Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: Notice of Availability Draft Environmental Impact 488: Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. EIS-0488-DEIS-NOA-2014.pdf More Documents & Publications

239

EIS-0488: EPA Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: EPA Notice of Availability of Draft Environmental Impact 488: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is

240

Environmental Spectroscopy and Biogeochemistry Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

ES&B Overview ES&B Overview Section 2-2-1 Environmental Spectroscopy and Biogeochemistry Facility The Environmental Spectroscopy and Biogeochemistry (ES&B) Facility focuses on environ- mental molecular science and application of the fundamental concepts of physical chemistry to the study of chemical reactions in heterogeneous natural materials, with an emphasis on soil and subsurface systems. The ES&B Facility staff, along with other Pacific Northwest National Laboratory (PNNL) staff, form a multidisciplinary research team with expertise in chemistry, mineral physics, geochemistry, soil chemistry, microbiology, hydrology, and environmental engineering. Capabilities Capabilities are available for materials characterization, aqueous- and solid-phase speciation

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

242

EA-1947: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri The National Nuclear Security Administration (NNSA) is preparing this Environmental Assessment (EA) to evaluate the potential environmental impacts of transferring the Kansas City Plant (KCP) to one or more entities for a use that is different from its current use. Transfer includes sale or lease of the property in whole or in part. This EA will provide NNSA with the information needed to make an informed decision about the transfer of the KCP property, which is on the Bannister Federal Complex (BFC) located within the city limits of Kansas City, Missouri. NNSA believes the transfer of this property would benefit NNSA and the local economic area.

243

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Draft Environmental Impact Statement 03: Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

244

EA-1885: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1885: Draft Environmental Assessment Boston Architectural College's (BAC) Urban Sustainability Initiative for the Renovation of Public Alley #444, Boston, MA (December 2011) DOE prepared this EA to evaluate the potential environmental consequences of providing a $1.6 million grant to Boston Architectural College (BAC) for its Urban Sustainability Initiative for the Renovation of Public Alley #444. The financial assistance proposed would be in the form of cost-shared funding, based on a FY2010 congressional earmark. This EA analyzes the potential environmental impacts of DOE's proposed action of providing the grant funding and of the No-Action Alternative. EA-1885-DEA-2011.pdf EA-1885-DearReaderLetter-2011.pdf More Documents & Publications

245

Environmental Management Waste Management Facility (EMWMF) at...  

Office of Environmental Management (EM)

Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Full Document and Summary Versions...

246

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

247

Environmental Restoration Disposal Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Receiving and Processing Facility Waste Sampling and Characterization Facility Waste Treatment Plant Environmental Restoration Disposal Facility Email Email Page | Print Print...

248

Draft Environmental ImpactDraft Environmental Impact Statement to InformStatement to InformStatement to InformStatement to Inform  

E-Print Network (OSTI)

Draft Environmental ImpactDraft Environmental Impact Statement to InformStatement to InformStatement to InformStatement to Inform Columbia River BasinColumbia River Basin Hatchery OperationsHatchery OperationsEIS Process Circulate final EIS for public reviewScoping Publish draft EIS Reflect preferred alternative

249

EA-1939: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Draft Environmental Assessment 9: Draft Environmental Assessment EA-1939: Draft Environmental Assessment Center for Commercialization of Electronic Technology, Reese Technology Center Wind and Battery Integration Project, Lubbock County, TX This EA evaluates the potential environmental consequences of providing a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. 115) to the Center for Commercialization of Electric Technology to demonstrate battery technology integration with wind generated electricity by deploying and evaluating utility-scale lithium battery technology to improve grid performance and thereby aid in the integration of wind generation into the local electricity supply. EA-1939-DEA-2012.pdf More Documents & Publications

250

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

251

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

252

EA-1921: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1921: Draft Environmental Assessment The Bureau of Land Management (BLM)(lead agency) and DOE are jointly preparing this EA, which evaluates the potential environmental impacts of a project proposed by Rockwood Lithium Inc (Rockwood), formerly doing business as Chemetall Foote Corporation. Rockwood has submitted to the BLM, Tonopah Field Office, an Operations Plan for the construction, operation, and maintenance of the Silver Peak Area Geothermal Exploration Project within Esmeralda County, Nevada. The purpose of the project is to determine subsurface temperatures, confirm the existence of geothermal resources, and confirm the existence of a commercial geothermal reservoir at the proposed well sites within federal geothermal lease N-87008. The proposed project

253

EA-1895: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Assessment 5: Draft Environmental Assessment EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis. EA-1895-DEA-2013.pdf More Documents & Publications

254

EA-1642S: Supplemental Draft Environmental Assessment | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky This EA evaluates the potential environmental impacts of DOE providing financial assistance to the University of Kentucky (UK) Center for Applied Energy Research (CAER) to partially fund the completion of the design, construction and operation of a small-scale pilot plant for research related to the gasification of coal and coal-biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch (FT) synthesis. This project is intended to evaluate the commercial and technical viability of

255

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

256

EIS-0374: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike III/Biglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. EIS-0374-DEIS-Summary-2006.pdf EIS-0374-DEIS-2006.pdf EIS-0374-DEIS-commentextension-2005.pdf More Documents & Publications EIS-0374: Final Environmental Impact Statement EIS-0374: Notice of Extension of Comment Period EIS-0374: Record of Decision

257

EIS-0450: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0: Draft Environmental Impact Statement 0: Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. EIS-0450-DEIS-Volume1-2013.pdf EIS-0450-DEIS-Volume2-2013.pdf EIS-0450-DEIS-Volume3-2013.pdf EIS-0450-DEIS-Appendices_A-H-2013.pdf More Documents & Publications

258

EIS-0250-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2D) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

259

EIS-0460: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. EIS-0460-DEIS-Summary-2013.pdf EIS-0460-DEIS-Volume_I-2013.pdf EIS-0460-DEIS-Volume_II-2013.pdf More Documents & Publications

260

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Draft Supplemental Environmental Assessment 3: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EA-1870: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this Environmental Assessment (EA) to evaluate the potential impacts of providing financial assistance to Viresco Energy, LLC, (Viresco) for its construction and operation of a Coal and Biomass Fueled Pilot Plant, that would be located in Kanab, Utah. The plant would be located on land leased to Viresco by the Utah School and Institutional Trust Lands Administration. The Pilot Plant would occupy approximately 1.5 acres of a 10-acre site located approximately 2.5 miles south of the downtown area of Kanab, Utah. EA-1870-DEA-2011d_0.pdf More Documents & Publications EA-1870: Finding of No Significant Impact

262

EA-1778: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1778: Draft Environmental Assessment Proposed Rule, 10 CFR Part 433: Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings and 10 CFR Part 435, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Low-Rise Residential Buildings". This EA evaluates the environmental impacts of of DOE's Proposed Rule, 10 CFR Part 433, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings" and

263

EIS-0399: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a merchant 230-kV transmission line between Great Falls, Montana, and Lethbridge, Alberta, that would cross the U.S.-Canada border north of Cut Bank, Montana. The transmission line would transmit 300 megawatts (MW) of electric power south and 300 MW north. EIS-0399-DEIS-Summary-2008.pdf EIS-0399-DEIS-01a-2008.pdf EIS-0399-DEIS-01b-2008.pdf EIS-0399-DEIS-01c-2008.pdf EIS-0399-DEIS-01d-2008.pdf EIS-0399-DEIS-01e-2008.pdf EIS-0399-DEIS-02-2008.pdf More Documents & Publications EIS-0399: Final Environmental Impact Statement EIS-0399-SA-01: Supplement Analysis Management Alert: OAS-RA-12-01

264

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

265

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

266

EA-1599: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

599: Draft Environmental Assessment 599: Draft Environmental Assessment EA-1599: Draft Environmental Assessment Disposition of Radioactively Contaminated Nickel Located at the East Tennessee Technology Park, Oak Ridge, Tennessee, and the Paducah Gaseous Diffusion Plant, Paducah, Kentucky The U.S. Department of Energy (DOE or the Department) proposes the disposition (that is, sale, transfer, grant, or disposal) of approximately 15,300 tons (13,800 metric tons) of nickel metal scrap DOE has recovered from equipment it used in the uranium enrichment processes at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, Kentucky, and the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, where DOE currently stores the nickel. Environmental Assessment Disposition of Radioactively Contaminated Nickel

267

EA-1793: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Draft Environmental Assessment 3: Draft Environmental Assessment EA-1793: Draft Environmental Assessment Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site The U.S. Department of Energy (DOE) proposes to provide replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Historically, INL has disposed of this LLW onsite. However, the existing disposal area located within the INL Radioactive Waste Management Complex will undergo closure as part of ongoing cleanup of INL and will not be available after 2017. The proposed project to establish replacement capability is not a DOE Environmental Management Idaho Cleanup Project

268

Draft Nevada National Security Site Environmental Impact Statement Released  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Environmental Impact Statement Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada is available for public review and comment through October 27, 2011. Within the draft SWEIS, the U.S. Department of Energy, National Security Administration Nevada Site Office presents a formal analysis of how current and potential missions at the NNSS (formerly the Nevada Test Site) and related off-site locations may affect the environment over the next ten

269

DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03 03 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 i September 2013 ACRONYMS AND ABBREVIATIONS BMPs best management practices CEQ Council on Environmental Quality CFR Code of Federal Regulations DASR digital airport surveillance radar dB decibel dBA decibel A-weighted

270

Condon Wind Project Draft Environmental Impact Statement  

SciTech Connect

BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource acquisition strategy; and meeting the objectives of its Power Business Line's Strategic Plan. The Draft Environmental Impact Statement (DEIS) evaluates the environmental impacts of the Proposed Action (to execute one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the proposed Condon Wind Project) and the No Action Alternative. BPA's preferred alternative is the Proposed Action. BPA has also identified the Proposed Action as the environmentally-preferred alternative. The proposed wind project is located on private agricultural land in Gilliam County, Oregon. The 38-acre project site is located within a 4,200-acre study area located on both sides of Oregon Highway 206, approximately 5 miles northwest of the town of Condon. The project would use modern, efficient 600-kilowatt (kW) wind turbines to convert energy in the winds to electricity that would be transmitted over the existing BPA transmission system. The project would consist of one or two phases: the first phase would use 41 wind turbines to yield a capacity of approximately 24.6 megawatts (MW). A second phase (if built) would use 42 wind turbines to yield a capacity of approximately 25.2 MW. For purposes of this DEIS, the size of the project is assumed to be 49.8 MW, built in two phases. Major components of the wind project include wind turbines and foundations, small pad-mounted transformers, an operation and maintenance building, power collection and communication cables, project access roads, meteorological towers on foundations, and a substation. During construction there would also be temporary equipment storage and construction staging areas. The first phase is proposed for construction in late 2001; the second phase could be constructed during spring/summer 2002 or later.

N /A

2001-06-01T23:59:59.000Z

271

DOE/EIS-0247; Draft Environmental Impact Statement Construction and Operation of the Spallation Neutron Source, December 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1998 December 1998 Construction and Operation of the S PALLATION N EUTRON S OURCE DRAFT ENVIRONMENTAL IMPACT STATEMENT U.S. Department of Energy Office of Science DOE/EIS-0247 Construction and Operation of the Spallation Neutron Source Facility Draft Environmental Impact Statement U.S. Department of Energy Office of Science December 1998 DOE/EIS-0247 Draft, December 1998 Cover Sheet COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS), Construction and Operation of the Spallation Neutron Source (DOE/EIS-0247) LOCATIONS OF ALTERNATIVE SITES: Illinois, New Mexico, New York, and Tennessee. CONTACT: For further information on this document, write or call: Mr. David Wilfert, EIS Document Manager U.S. Department of Energy Oak Ridge Operations Office

272

DRAFT ENVIRONMENTAL IMPACT STATEMENT -INITIAL REGULATORY IMPACT REVIEW -  

E-Print Network (OSTI)

DRAFT ENVIRONMENTAL IMPACT STATEMENT - INITIAL REGULATORY IMPACT REVIEW - INITIAL REGULATORY in the INTERSTATE FISHERY MANAGEMENT PLAN FOR AMERICAN LOBSTER April 2010 #12;#12;UNITED STATES DEPARTMENT DF . Maryland 2081 0 APR 19 2010 Dear Reviewer: In accordance with provisions of the National Environmental

273

EIS-0310: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Draft Programmatic Environmental Impact Statement 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these responsibilities, DOE maintains nuclear infrastructure capabilities that support various missions. Current estimates for the future needs of medical and industrial isotopes, plutonium-238, and research requirements indicate that the current infrastructure may soon be insufficient to meet the projected demands. DOE proposes to enhance these

274

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

275

EIS-0378: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to Bonneville Power Administration (BPA), another organizational unit within DOE, for interconnection into the federal transmission system. EIS-0378-DEIS-Summary-2007.pdf

276

EA-1916: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1916: Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 On September 1, 2011, Ocean Renewable Power Company Maine, LLC (ORPC Maine) filed an application for an 8-year pilot license to construct and operate its proposed Cobscook Bay Tidal Energy Project (Cobscook Bay Project or project). The 300-kilowatt (kW) hydrokinetic project would be located in Cobscook Bay in Washington County, Maine. The project would not be located on federal lands. The proposed Cobscook Bay Project would use the tidal currents of Cobscook Bay to generate electricity via cross-flow Kinetic System turbine generator units (TGU) mounted on the seafloor. The TGUs would capture

277

EA-1829: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 3610 Morgantown, WV 26507-0880 Electronic mail: Jesse.Garcia@netl.doe.gov The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost

278

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

279

EA-1617: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

280

EIS-0391: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0391: Draft Environmental Impact Statement Tank Closure and Waste Management for the Hanford Site, Richland, WA Abstract: The Hanford Site (Hanford), located in southeastern Washington State and situated along the Columbia River, is approximately 1,518 square kilometers (586 square miles) in size. Hanford's mission from the early 1940s to approximately 1989 included defense-related nuclear research, development, and weapons production activities. These activities created a wide variety of chemical and radioactive wastes. Hanford's mission now is focused on the cleanup of those wastes and ultimate closure of Hanford. To this end, several types of radioactive waste are being managed at Hanford: (1) high-level radioactive waste (HLW) as defined in DOE Manual

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0473: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial assistance to NRG under the Clean Coal Power Initiative (CCPI) Program to support construction and operation of NRG's Parish PCCS Project . EIS-0473-DEIS-Summary-2012.pdf EIS-0473-DEIS-VolumeI-2012.pdf EIS-0473-DEIS-VolumeII-AppendicesA-B-2012.pdf EIS-0473-DEIS-VolumeII-AppendixC-Part1-2012.pdf

282

EA-1812: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado For more information, contact: Ms. Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, Colorado 80401 Electronic mail: melissa.rossiter@go.doe.gov DOE is proposing to authorize the expenditure of Federal funding through the Community Renewable Energy Deployment Program to Phillips County for design, permitting, and construction of an approximately 30-megawatt wind energy project, known as Haxtun Wind Project, within Phillips and Logan counties in northeastern Colorado. The proposed project consists of 18 wind turbines that would interconnect to the Highline Electric Cooperative equipment inside Western Area Power Administration's Haxtun substation just

283

EIS-0407: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0407: Draft Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide approximately $85 million of the total anticipated cost of approximately $300 million (2008 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity) sufficient to meet the needs of

284

EA-1800: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1800: Draft Environmental Assessment Monarch Warren County Wind Turbine Project, Lenox Township, Warren County, Illinois The U.S. Department of Energy (DOE) has provided Federal funding to the Illinois Department of Commerce and Economic Opportunity (DCEO) under the State Energy Program (SEP). DCEO is seeking to provide $5 million of its SEP funds to Monarch Wind Power (MWP), who would use these funds for the design, permitting and construction of 12, 1.6- megawatt wind turbines, for a combined generation capacity of 19.2 megawatts. This EA provides DOE and other decisionmakers the information needed to make an informed decision about the installation, operation, and eventual decommissioning of the proposed wind project. The EA evaluates the potential individual and

285

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

286

EA-1862: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9/3/11 Submit comments to: Melissa Rossiter DOE Golden Field Office 1617 Cole Blvd Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce under the State Energy Program (SEP). Wisconsin selected an Oneida Seven Generations Corporation (Oneida) project to receive a $2 million loan under the SEP. The Bureau of Indian Affairs (BIA), an agency of the Department of the Interior (DOI), has already provided $584,000 in Federal funding to Oneida for this project. BIA is also considering providing a loan guarantee of up to $19 million. BIA made

287

EA-1823: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1823: Draft Environmental Assessment Rockford Solar Energy Project, Chicago-Rockford Airport, Winnebago County, Illinois For more information contact: Mr. John Jediny, NEPA Document Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Telephone: 202-287-5380 Fax: 202-340-9260 Electronic mail: John.Jediny@ee.doe.gov Public Hearing: Date: Monday, October 24, 2011; Time: 4 p.m. to 7 p.m. Location: Auditorium at the Offices of the Greater Rockford Airport Authority, 60 Airport Drive, Rockford, Illinois, 61109 DOE's proposed action would authorize Federal funding to the Illinois Department of Commerce and Economic Opportunity under the State Energy Program.

288

EA-1855: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

289

EIS-0395: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio Colorado (SLRC) Power Center, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company's (APS') North Gila Substation. The Proposed Project would require an expansion of Gila Substation and additional equipment at North Gila Substation; all of the proposed transmission components would be located in Yuma County, Arizona. Depending on the route ultimately selected, the total length of the 500-kV transmission system within the United States would be approximately 25.7 miles-21 miles from the United States-Mexico border to Gila Substation

290

EA-1944: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1944: Draft Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV This EA evaluates a proposal by Ormat Technologies, Inc. (Ormat) to use DOE and cost share funding to study the Brady Hot Springs geothermal Field 15-12RD well. This is an EGS Demonstration project divided into three phases. During Phase 1, Ormat characterized the target well to prepare for stimulation activities in Phase 2, Phase 2: Well Stimulation and Collection/Analysis of Stimulation Monitoring Data and Phase 3: Long-term testing of the system. Phase 2 and 3 activities would occur at Ormat's Brady Hot Springs geothermal field in Churchill County, NV on public lands managed by the Bureau of Land Management (BLM) and Bureau of Reclamation

291

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

292

EA-1792: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Assessment EA-1792: DOE Notice of Availability of the Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This draft EA to evaluate and describe the potential environmental impacts associated with the: University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine. Notice of Availability of the Draft Environmental Assessment for the University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine, DOE/EA-1792 (June 2011) More Documents & Publications EA-1792: DOE Notice of Availability of the Environmental Assessment and Finding of No Significant Impact

293

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

294

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Closing the Circle: Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table of Contents Part I: Making of the Nuclear Weapons Complex, 1942-1955 1 The Manhattan Project: Genesis of the Complex 1 2 Health and Safety Concerns Environmental and Waste Management Concerns 3 The Atomic Energy Commission: Expansion of the Complex

295

Draft Environmental Impact Statement Ivanpah Energy Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Summary Executive Summary EXECUTIVE SUMMARY IVANPAH ENERGY CENTER Ivanpah Energy Center, L.P., a Diamond Generating Corporation Company, a subsidiary of Mitsubishi Corporation proposes to construct and operate a 500 Megawatt (MW) gas-fired electric power generating station in southern Clark County, Nevada. The facility that would be known as the Ivanpah Energy Center, LP, would be located approximately 25 miles south of Las Vegas. Six potential plant sites within the Ivanpah Valley were initially identified as potentially suitable for development; four sites were eliminated from further consideration due to environmental and engineering constraints. A site that is approximately 2.5 miles southeast of Goodsprings and a site that would be co- located with the Reliant Bighorn

296

EIS-0353: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana EIS No. 040274, Draft EIS, DOE, MT, South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Preserve the Genetic Purity of the Westslope Cutthroat Trout Population, Flathead National Forest, Flathead River, Flathead, Powell and Missoula Counties, Montana DOE/EIS-0353 Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana, 69 FR 34161 (June 2004) More Documents & Publications

297

SECRETARIAL REVIEW DRAFT ENVIRONMENTAL ASSESSMENT / REGULATORY IMPACT REVIEW /  

E-Print Network (OSTI)

SECRETARIAL REVIEW DRAFT ENVIRONMENTAL ASSESSMENT / REGULATORY IMPACT REVIEW / INITIAL REGULATORY RIR Regulatory Impact Review RP Central GOA Rockfish Program RP CV Rockfish Program Catcher Vessel RPA FLEXIBILITY ANALYSIS For a proposed Amendment to the Fishery Management Plan for Groundfish of the Gulf

298

DRAFT FOR SECRETARIAL REVIEW ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/  

E-Print Network (OSTI)

DRAFT FOR SECRETARIAL REVIEW ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/ FINAL REGULATORY an Amendment to the Fishery Management Plan for the Groundfish Fishery of the Bering Sea and Aleutian Islands Area including a Regulatory Amendment to rescind regulations (� 675.22, paragraphs c,d,e) that allow

299

Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433  

Energy.gov (U.S. Department of Energy (DOE))

Document details a the draft environmental assessment for proposed rule 10 CFR Part 433, Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings

300

EIS-0359: Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EA-1616-S1: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

National Carbon Capture Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, Alabama

302

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

303

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

304

MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MESABA ENERGY PROJECT MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 DOE/EIS-0382D MN PUC DOCKET # E6472/GS-06-668 U.S. Department of Energy in cooperation with Minnesota Department of Commerce Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Responsible State Agency: Minnesota Department of Commerce (MDOC) Cooperating Agencies: U.S. Army Corps of Engineers and U.S. Department of Agriculture Forest Service Title: Mesaba Energy Project, Draft Environmental Impact Statement (DOE/EIS-0382D) Location: Taconite Tax Relief Area of northeastern Minnesota, Itasca and St. Louis Counties Contact: For further information about this Environmental Impact Statement, contact:

305

EIS-0374: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and ancillary facilities from the proposed wind projects to BPA's John Day 500-kV Substation. DOEEIS-0374, Environmental Protection Agency, Notice of Availability of the...

306

EIS-0478: EPA Notice of Availability of a Draft Environmental...  

Energy Savers (EERE)

potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area...

307

EIS-0373: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: EPA Notice of Availability of the Draft Environmental 73: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0373: EPA Notice of Availability of the Draft Environmental Impact Statement Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems DOE/EIS-0373, EPA Notice of Availability of the Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems, 70 FR 38132 (July 2005) More Documents & Publications EIS-0374: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact

308

EIS-0284: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois DOE/EIS-0284, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois, 69 FR 10442 (March 2004) More Documents & Publications EIS-0348: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0397: EPA Notice of Availability of the Draft Environmental Impact

309

EIS-0444: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

444: EPA Notice of Availability of the Draft Environmental 444: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0444: EPA Notice of Availability of the Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of Availability - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals Production Plant, Odessa, Ector County, Texas, DOE/EIS-0444 (March 2011 - 76 FR 14968) More Documents & Publications EIS-0403: EPA Amended Notice of Availability of the Draft Programmatic Environmental Impact Statement (Extension of Public Comment Period) EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact

310

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joseph Hatchery Program Joseph Hatchery Program Draft EIS S-1 SUMMARY Purpose and Need The Northwest Power and Conservation Council (NPCC, www.nwcouncil.org) recommended that the Bonneville Power Administration (BPA) study and consider funding a Chinook salmon production program and hatchery proposed by the Confederated Tribes of the Colville Reservation (Colville Tribes). The proposal intends to increase returns of adult summer/fall Chinook by raising and releasing juvenile fish in the waters of the Okanogan River, and in the Columbia River below Chief Joseph Dam and above its confluence with the Okanogan River. The proposed program would construct, operate and maintain a hatchery below the Chief Joseph Dam on the Columbia River and several fish acclimation and release ponds on the Okanogan River and Omak

311

Lyle Falls Fish Passage Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Draft Environmental Impact Statement DOE/EIS-0397 March 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Lyle Falls Fish Passage Project Draft Environmental Impact Statement (DOE/EIS-0397) Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); Confederated Tribes and Bands of the Yakama Nation (Yakama Nation); Washington Department of Fish and Wildlife (WDFW); U.S. Department of Agriculture, Forest Service (USFS), Title of Proposed Project: Lyle Falls Fish Passage Project State Involved: Washington (WA) Abstract: BPA proposes to fund modification of the existing Lyle Falls Fishway on the lower Klickitat River in

312

Resource Contingency Program : Draft Environmental Impact Statement.  

SciTech Connect

In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

313

EIS-0386: Draft Programmatic Environmental Impact Statement ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prepare a Programmatic Environmental Impact Statement, Amend Relevant Agency Land Use Plans, and Conduct Public Scoping Meetings, and Notice of Floodplain and Wetlands Involvement...

314

Draft Environmental Assessment on the Remote-handled Waste Disposition  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment The U.S. Department of Energy invites the public to review and comment on a draft environmental assessment that the Department issued today, for a proposal to process approximately 327 cubic meters of remote-handled waste currently stored at the Idaho National Laboratory. An additional five cubic meters of waste stored at the Hanford Site near Richland, Washington is also evaluated since it is reasonably foreseeable that a decision may be made in the future to send that waste to Idaho for treatment. The project is necessary to prepare the waste for legally-required disposal. Under the Department�s preferred alternative, workers would use sealed rooms called hot cells at the Idaho Nuclear Technology and Engineering Center (INTEC) to process the waste, treat it as necessary and repackage it so that it is ready for disposal. The document describes the modifications necessary to hot cells to perform the work.

315

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft Environmental Impact

316

Environmental Management FY 2006 Budget Request DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Christine Gelles Christine Gelles Director of Disposal Operations Office of Environmental Management US Dept. of Energy, Environmental Management Program Waste Disposition Highlights Presentation for the Transportation External Coordination Working Group 24 July 2007 * EM leads DOE's complex-wide efforts to improve disposition planning and optimize waste disposition projects * DOE's waste management policy remains unchanged and DOE's Programmatic Waste Management Environmental Statement and Records of Decision are still valid * "National Disposition Strategies" refer to updated plans, tools and management actions needed to strengthen disposition projects and provide greater transparency to DOE sites, communities, stakeholders and regulators Introduction * LLW/MLLW - If practical, disposal on the site where generated

317

Sacramento Area Voltage Support Draft Environmental Impact Statement  

SciTech Connect

The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

N /A

2002-11-15T23:59:59.000Z

318

National Environmental Justice Advisory Council Federal Facilities Working Group Report  

Energy.gov (U.S. Department of Energy (DOE))

Environmental Justice and Federal Facilities: recommendations for improving stakeholder relations between federal facilities and environmental justice communities, October 2004

319

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: EPA Notice of Availability of the Draft Environmental 6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

320

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania The Department of Energy has prepared...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Summary and Chapters 1 - 7 May 2006 Draft Environmental Impact Statement for Site Selection for the Expansion of the Strategic Petroleum Reserve Document No. DOE/EIS-0385 Responsible Federal Agency: U.S. Department of Energy (DOE), Office of Petroleum Reserves Location: Potential new SPR storage sites are located in Lafourche Parish, Louisiana; Perry and Claiborne Counties, Mississippi; and Brazoria County, Texas. Existing Strategic Petroleum Reserve (SPR) storage sites that could be expanded are located in Cameron, Calcasieu, and Iberville Parishes, Louisiana; and Jefferson County, Texas. Associated pipelines, marine terminals, and other facilities that might be developed are located in East Baton Rouge, East Feliciana, St. James, Terrebonne, West Baton

322

RESPONSES TO PUBLIC AND AGENCY COMMENTS ON THE DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONSES TO PUBLIC AND AGENCY COMMENTS RESPONSES TO PUBLIC AND AGENCY COMMENTS ON THE DRAFT ENVIRONMENTAL ASSESSMENT FOR LEASE OF LAND AND FACILITIES AT THE EAST TENNESSEE TECENOLOGY PARK OAK RIDGE,TENNESSEE @OE/EA-1175) NOVEMBER 1997. U.S. DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE OAK RIDGE, TENNESSEE [blank page] CONTENTS 1 1 . INTRODUCTION ................................................................ 1 2. SCOPE AND ORGANIZATIONS ................................................... 3 3. COMMENTS AND RESPONSES .i ................................................. 5 3.1 DOE NEPA Review Process/Categorical Exclusions .............................. 5 3.1.1 SummaryofComments ............................................... 5 3.1.2 Response/Revisions .................................................. 5

323

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Final Environmental Impact

324

EIS-0348: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: EPA Notice of Availability of the Draft Environmental 8: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0348: EPA Notice of Availability of the Draft Environmental Impact Statement Site-wide Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship and Management, Implementation Alameda and San Joaquin Counties, CA U.S. Environmental Protection Agency Environmental Impact Statements Notices of Availability: Site-wide Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship and Management,Implementation, Alameda and San Joaquin Counties, CA, EIS-0348, EIS-0236S3 (February 2004) More Documents & Publications EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0397: EPA Notice of Availability of the Draft Environmental Impact

325

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

326

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21: EPA Notice of Availability of the Draft Environmental 21: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

327

Draft Environmental Impact Statement for a Container System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Navy (Lead Agency) the Navy (Lead Agency) Naval Nuclear Propulsion Program Department of Energy (Cooperating Agency) - DOE/EIS-0251 Prepared in accordance with: National Environmental Policy Act Section 102 (2) (C) FINAL ENVIRONMENTAL IMPACT STATEMENT FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF NAVAL SPENT NUCLEAR FUEL Contact: William Knoll Department of the Navy Code NAVSEA 08U 2531 Jefferson Davis Highway Arlington, VA 22242-5160 Telephone Number: 703-602-8229 Abstract: This Final Environmental Impact Statement (EIS) addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. It supersedes the Draft Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel dated May 1996.

328

EIS-0350: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico U.S. Department of Energy (DOE), announces the availability of the Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico (the Draft CMRR EIS), and the dates and locations for the public hearings to receive comments on the Draft CMRR EIS. The present Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL) houses mission critical analytical chemistry, material

329

EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Site-Wide DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a separately-organized agency within the Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security Complex (Draft Y-12 SWEIS, DOE/EIS-0387) (74 FR 56189) (October 2009) National Nuclear Security Administration Notice of Availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security Complex, EIS-0387(October 2009) More Documents & Publications EIS-0387: Record of Decision

330

Environmental Management FY 2006 Budget Request DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transportation - Key to Transportation - Key to EM Success Presented to the Transportation External Coordination Working Group July 24, 2007 James Rispoli, Assistant Secretary Office of Environmental Management Solving Cleanup Challenges Through Risk Reduction 2 Solving Cleanup Challenges Through Risk Reduction ● EM's mission is the safe and successful cleanup of the Cold War legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research and includes:  Over 80 million gallons of radioactive liquid waste - the volume equivalent of 121 Olympic-size swimming pools  More than two thousand tons of spent nuclear fuel - roughly equal to the weight of 1,175 Toyota Camrys

331

Environmental Protection Agency Environmental Impact Statements; Notice of Availability of the Draft Supplement for the Programmatic EIS-Stockpile and Management for a Modern Pit Facility (MPF) Construction and Operation (6/6/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34 34 Federal Register / Vol. 68, No. 109 / Friday, June 6, 2003 / Notices information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. Dated: May 28, 2003. Drusilla Hufford, Director, Global Programs Division. [FR Doc. 03-14323 Filed 6-5-03; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6640-8] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202)

332

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

333

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

334

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07: EPA Notice of Availability of the Draft Environmental 07: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement

335

EA-1773: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: DOE Notice of Availability of the Draft Environmental 3: DOE Notice of Availability of the Draft Environmental Assessment EA-1773: DOE Notice of Availability of the Draft Environmental Assessment Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the: Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Notice of Availability of the Draft Environmental Assessment for the Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida, DOE/EA-1773 (August 2010) More Documents & Publications EA-1772: Finding of No Significant Impact CX-001234: Categorical Exclusion Determination

336

EIS-0336: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement'' (DOE/EIS-0336) for public review and comment. DOE/EIS-0336, Department of Energy, Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line, 68 FR 51569 (August 2003) More Documents & Publications EIS-0336: Final Environmental Impact Statement

337

EIS-0439: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: DOE Notice of Availability of the Draft Environmental 9: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and the Loan Guarantee Program (LGP), the California Energy Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact Statement (EIS) and Staff Assessment (SA), which may require a California Desert Conservation Area (CDCA) Plan Amendment, as a joint environmental analysis document for the proposed Rice Solar Energy Project (Project), in Riverside County, California, and by this notice are announcing the opening of the comment period. Western Area Power Administration Draft Environmental Impact

338

EIS-0385: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85: EPA Notice of Availability of the Draft Environmental 85: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements: Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX DOE/EIS-0385, Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve

339

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

399: EPA Notice of Availability of the Draft Environmental 399: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

340

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: EPA Notice of Availability of the Draft Environmental 79: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0464: EPA Notice of Availability of Final Environmental Impact

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0385: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements: Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX DOE/EIS-0385, Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve

342

EA-1773: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1773: DOE Notice of Availability of the Draft Environmental EA-1773: DOE Notice of Availability of the Draft Environmental Assessment EA-1773: DOE Notice of Availability of the Draft Environmental Assessment Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the: Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Notice of Availability of the Draft Environmental Assessment for the Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida, DOE/EA-1773 (August 2010) More Documents & Publications EA-1772: Finding of No Significant Impact CX-001234: Categorical Exclusion Determination

343

Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1  

SciTech Connect

This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

NONE

1994-08-31T23:59:59.000Z

344

EIS-0435: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0435: EPA Notice of Availability of the Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Availability for the Draft Environmental Impact Statement for the Groton Generation Station (GGS) Project, Proposes to Modify its Interconnection Agreement, Basin Electric Power Cooperative, for the (GGS) to Eliminate 50-Megawatts (MW) Annual Average Operating Limit, Brown County, South Dakota. Notice of Availability for the Draft Environmental Impact Statement for the Groton Generation Station (GGS) Project, Brown County, South Dakota, DOE/EIS-0435 (August 2010 - 75 FR 47591) More Documents & Publications

345

EIS-0460: DOE Notice of Availability of the Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0460: DOE Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois DOE announces the availability of the Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) for public review and comment, as well as the date, location, and time for a public hearing. The draft environmental impact statement (EIS) analyzes the potential impacts associated with the FutureGen 2.0 Project (FutureGen 2.0), which would be designed, constructed, operated, and partially funded by the FutureGen Industrial Alliance, Inc. (Alliance). In addition to Alliance funding, FutureGen 2.0 may receive approximately $1 billion in federal

346

EIS-0414: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: DOE Notice of Availability of the Draft Environmental 4: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Energia Sierra Juarez U.S. Transmission Project (ESJ-U.S.), EIS-0414 (September 2010) More Documents & Publications Addressing Policy and Logistical Challenges to Smart Grid Implementation:

347

Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft  

SciTech Connect

The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

NONE

1988-01-01T23:59:59.000Z

348

Draft Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development in Six Southwestern States (DES 10-59; DOE/EIS-0403) Responsible Agencies: The U.S. Department of the Interior (DOI) Bureau of Land Management (BLM) and the U.S. Department of Energy (DOE) are co-lead agencies. Nineteen cooperating agencies participated in the preparation of this PEIS: U.S. Department of Defense; U.S. Bureau of Reclamation; U.S. Fish and Wildlife Service; U.S. National Park Service; U.S. Environmental Protection Agency, Region 9; U.S. Army Corps of Engineers, South Pacific Division; Arizona Game and Fish Department; California Energy Commission; California Public Utilities Commission; Nevada Department of Wildlife; N-4 Grazing Board, Nevada; Utah Public Lands Policy Coordination Office; Clark County, Nevada,

349

EIS-0281: Draft Environmental Impact Statement Summary (Spanish) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Summary (Spanish) Statement Summary (Spanish) EIS-0281: Draft Environmental Impact Statement Summary (Spanish) DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative (exclusive of the Microsystems and Engineering Sciences Applications Complex configuration). EIS-0281-DEIS-Spanish_Summary-1999.pdf More Documents & Publications Ahorre Energía 2013 National Environmental Justice Conference and Training Program PREPARATIVOS EN MARCHA PARA LA CONFERENCIA SOBRE JUSTICIA AMBIENTAL NACIONAL Y EL PROGRAMA DE CAPACITACIÓN 2014

350

EIS-0281: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement EIS-0281: Draft Environmental Impact Statement DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative (exclusive of the Microsystems and Engineering Sciences Applications Complex configuration). EIS-0281-DEIS-1999-Summary-Chapts1-4_1.pdf EIS-0281-DEIS-1999-Appendices_2.pdf EIS-0281-DEIS-1999-MainVolume_10.pdf More Documents & Publications TEE-0074 - In the Matter of GE Appliances & Lighting CX-003794: Categorical Exclusion Determination EIS-0281: Final Site-Wide Environmental Impact Statement

351

EIS-0365: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV Transmission Line, Presidential Permit and Right-of- Way Grants, Imperial Valley Substation to Calexico at the U.S.- Mexico Border, Imperial County, CA Notice of Availability Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines (69FR26817) (May 14, 2004) More Documents & Publications EIS-0365: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Final Environmental Impact

352

EIS-0286: EPA Notice of Availability of the Revised Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0286: EPA Notice of Availability of the Revised Draft EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program Notice of Availability of the Revised Draft Environmental Impact Statement for the Hanford Site Solid (Radioactive and Hazardous) Waste Program, New Information on Waste Management Alternatives, Waste Management Practices Enhancement for Low-Level Radioactive Waste, Mixed Low-Level Radioactive Waste and Transuranic Waste, Richard, Benton County, Washington. Notice of Availability of the Revised Draft Environmental Impact Statement for the Hanford Site Solid (Radioactive and Hazardous) Waste Program, DOE/EIS-0286 (April 2003)

353

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

354

EIS-0365: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: EPA Notice of Availability of the Draft Environmental 5: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV Transmission Line, Presidential Permit and Right-of- Way Grants, Imperial Valley Substation to Calexico at the U.S.- Mexico Border, Imperial County, CA Notice of Availability Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines (69FR26817) (May 14, 2004) More Documents & Publications EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Final

355

EIS-0457: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Comment Period Ends: 03/05/12 Submit Comments to: Douglas Corkran Environmental Specialist Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-7646 Fax: 503-230-5699 Electronic mail: dfcorkran@bpa.gov EIS-0457-EPANOADEIS-2012.pdf More Documents & Publications EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

356

EIS-0355: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

357

Draft environmental assessment -- Test Area North pool stabilization project update  

SciTech Connect

The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

NONE

1997-06-01T23:59:59.000Z

358

EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Site-Wide DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada The National Nuclear Security Administration (NNSA), a separately organized semi-autonomous agency within the U.S. Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (Draft SWEIS, DOE/EIS-0426D) for public review, as well as the locations, dates and

359

Yakima Fisheries Project : Revised Draft Environmental Impact Statement.  

SciTech Connect

BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

United States. Bonneville Power Administration.

1995-05-01T23:59:59.000Z

360

EIS-0226: DOE Notice of Availability of the Revised Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: DOE Notice of Availability of the Revised Draft 6: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) and the New York State Energy Research and Development Authority (NYSERDA) are announcing their intent to prepare an Environmental Impact Statement (EIS) for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project (WVDP) and Western New York Nuclear Service Center (also known as the ''Center''). DOE/EIS-0226, Notice of Availability of the Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: DOE Notice of Availability of the Draft Environmental 77: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power

362

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08: DOE Notice of Availability of a Programmatic Draft 08: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

363

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River

364

DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013.

365

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of a Programmatic Draft DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

366

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0346: EPA Notice of Availability of the Draft Environmental EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

367

TTRDC - Facilities - APRF - Environmental Test Cell  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Powertrain Research Facility: Advanced Powertrain Research Facility: Environmental Test Cell Allows Extremes of Hot and Cold environmental test cell Environmental Test Cell showing its solar lamps on the ceiling. Inside Argonne's new Environmental Test Cell (ETC), vehicle researchers are able to simulate a range of external temperatures-from frigid cold to blistering heat-in order to study the impact of temperature on the performance of electrified vehicles (EVs). The ETC is a major upgrade to Argonne's world-class Advanced Powertrain Research Facility (APRF). The ETC allows vehicles to be tested at a temperature range between 20°F to 95°F under simulated sunshine. Previously, Argonne researchers were only able to test from 72°F to 95°F without a solar load. In addition, in the upgraded test cell researchers can now perform the new

368

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 U.S. Department of Energy, Office of Nuclear Energy DOE/EIS-0396 Summary Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement October 2008 Summary Prepared by: DOE/EIS-0396 SUMMARY Summary GNEP Draft PEIS S-i Table of Contents S.1 INTRODUCTION................................................................................................................... 1 S.1.1 Purpose and Need for Agency Action ........................................................................ 3 S.1.1.1 Energy/Electricity ................................................................................................... 3 S.1.1.2 Spent Nuclear Fuel Disposal and Waste Reduction

369

EA-1969: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment Clark Fork River Delta Restoration Project, Bonner County, Idaho Bonneville Power Administration issued a draft EA that analyzes the potential effects of a proposal to...

370

EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Notice of Intent to Prepare a Draft Environmental Impact 0: Notice of Intent to Prepare a Draft Environmental Impact Statement EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam, AZ Two agencies of the Department of Interior, the Bureau of Reclamation and the National Park Service announces their intent to prepare an EIS for a Long-Term Experimental and Management Plan for the operation of the Glen Canyon Dam. DOE's Western Area Power Administration is a cooperating agency. EIS-0480-NOI-2011.pdf More Documents & Publications EIS-0150: Final Environmental Impact Statement 2013 Annual Planning Summary for the Western Area Power Administration Environmental Impact Statements and Environmental Assessments Status Chart

371

Alternative Fuels Data Center: Ethanol Production Facility Environmental  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Production Ethanol Production Facility Environmental Assessment Exemption to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Facility Environmental Assessment Exemption on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Facility Environmental Assessment Exemption on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Facility Environmental Assessment Exemption on Google Bookmark Alternative Fuels Data Center: Ethanol Production Facility Environmental Assessment Exemption on Delicious Rank Alternative Fuels Data Center: Ethanol Production Facility Environmental Assessment Exemption on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Facility Environmental Assessment Exemption on AddThis.com...

372

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

440: DOE and EPA Notice of Availability of a Draft 440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

373

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: DOE and EPA Notice of Availability of a Draft 40: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

374

EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Notice of Availability of a Draft Supplemental 3-S1: Notice of Availability of a Draft Supplemental Environmental Assessment (DOE/EA-1887) EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental Assessment (DOE/EA-1887) Proposed Renewable Fule Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO DOE's Golden Field Office has prepared a draft Supplemental Environmental Assessment (SEA) for improvments to the Renewable Fuel Heat Plant (RFHP) NREL South Table Mountain site. The SEA and the RFHP EA are now available for public review. See DOE/EA-1573-S1. EA-1573D-S1-NOA-2012_0.pdf More Documents & Publications EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO

375

EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare a Supplemental Draft Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota Western Area Power Administration is evaluating the potential environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to Western's existing Wilton/Baldwin substation and allowing NextEra's existing wind projects in this area to operate above 50 annual MW. Western is preparing a Supplemental Draft EIS to address substantial changes to the proposal, including 30 turbine locations and 5 alternate turbine locations in Crofte Township.

376

"FutureGen 2.0 Project Draft Environmental Impact Statement Summary"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SHEET SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

377

DRAFT ENVIRONMENTAL ASSESSMENT FOR THE NATIONAL CENTER FOR NATURAL PRODUCTS RESEARCH  

E-Print Network (OSTI)

DRAFT ENVIRONMENTAL ASSESSMENT FOR THE NATIONAL CENTER FOR NATURAL PRODUCTS RESEARCH PHASE II BLANK #12;ENVIRONMENTAL ASSESSMENT FOR THE NATIONAL CENTER FOR NATURAL PRODUCTS RESEARCH PHASE II. #12;ENVIRONMENTAL ASSESSMENT FOR THE NATIONAL CENTER FOR NATURAL PRODUCTS RESEARCH PHASE II UNIVERSITY

Tchumper, Gregory S.

378

Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.  

SciTech Connect

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

379

Puget Sound area electric reliability plan. Draft environmental impact statement  

SciTech Connect

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

Not Available

1991-09-01T23:59:59.000Z

380

EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE/EA-1792S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT Castine US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado January 2013 DOE/EA-1792S i Draft - January 2013 ACRONYMS AND ABBREVIATIONS CMP Central Maine Power CFR Code of Federal Regulations DMR Maine Department of Marine Resources DOE U.S. Department of Energy DPS distinct population segment EA environmental assessment EFH essential fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish aggregation device

382

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1890: DOE Notice of Availability of the Draft Environmental EA-1890: DOE Notice of Availability of the Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave

383

EIS-0426: Draft Site-Wide Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Site-Wide Environmental Impact Statement Draft Site-Wide Environmental Impact Statement EIS-0426: Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada Abstract: This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzes the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada Test Site) and other U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)-managed sites in Nevada, including the Remote

384

EA-1916: DOE Notice of Availability of a Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: DOE Notice of Availability of a Draft Environmental 6: DOE Notice of Availability of a Draft Environmental Assessment EA-1916: DOE Notice of Availability of a Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

385

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon (December 2010)

386

EA-1916: DOE Notice of Availability of a Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

916: DOE Notice of Availability of a Draft Environmental 916: DOE Notice of Availability of a Draft Environmental Assessment EA-1916: DOE Notice of Availability of a Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

387

Draft Environmental Impact Statement for the Disposal of Greater-Than-Class  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for the Disposal of Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste February 18, 2011 - 12:00pm Addthis WASHINGTON - The Department of Energy (DOE) has issued a Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste (LLRW) and GTCC-Like Waste (DOE/EIS-0375D, Draft EIS) as required under the National Environmental Policy Act for public review and comment. GTCC LLRW consists of a small volume of low-level radioactive waste generated throughout the United States as the result of Nuclear Regulatory Commission (NRC) and Agreement State licensed activities, including

388

Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement Summary.  

SciTech Connect

This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe`s culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle.

United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho)

1996-06-01T23:59:59.000Z

389

Environmental assessment: South microwave communication facilities  

SciTech Connect

Western Area Power Administration (Western) is proposing to construct, operate, and maintain eight microwave repeater stations in southwestern Colorado, southeastern Utah, and northern Arizona, in order to meet the minimum fade criteria established by the Western Systems Coordinating Council (WSCC) for the operation and protection of electric power systems. The proposed microwave facilities would increase the reliability of communication. This environmental assessment (EA) describes the existing environmental conditions and the impacts from construction of the eight microwave communication facilities. The EA was prepared in compliance with the National Environmental Policy Act of 1969, the Council on Environmental Quality Regulations (40 CFR 1500-1508), and the Department of Energy Guidelines (52 FR 47662, December 15, 1987). The proposed project would consist of constructing eight microwave facilities, each of which would include a self-supported lattice tower, an equipment building, a propane tank, distribution lines to provide electric power to the sites, and access roads to the sites. The facilities would be constructed in San Miguel and Montezuma Counties in Colorado, San Juan County, Utah, and Navajo, Apache, Coconino, and Yavapai Counties in Arizona. 20 refs., 2 figs., 2 tabs.

Not Available

1989-06-01T23:59:59.000Z

390

Field Calibration Facilities for Environmental Measurement of Radium,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Calibration Facilities for Environmental Measurement of Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) The first edition of this report, released in October 1982, presented physical-characteristic information for the various DOE radiologic-instrument calibration facilities located throughout the U.S. Three subsequent editions have been released in an effort to update information regarding the current status of the facilities. Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) More Documents & Publications Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (June 1994)

391

EIS-0450: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers (EERE)

Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest...

392

EIS-0250-S1: Draft Supplemental Environmental Impact Statement...  

Office of Environmental Management (EM)

generated at 72 commercial and 4 DOE sites would be shipped to the repository by rail (train), although some shipments would arrive at the repository by truck. The Draft...

393

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

394

Greening Federal Facilities: An Energy, Environmental, and Economic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greening Federal Facilities: An Energy, Environmental, and Economic Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition A nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition More Documents & Publications From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet) Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure)

395

(Draft) Character Study Charrette Summary PLANNING, FACILITIES & OPERATIONS 1  

E-Print Network (OSTI)

, natural resource management and historic preservation - a balance of social, cultural, and environmental studies and utility system master planning to preparation of construc- tion documents and management and cultural. In his practice- concerned mainly with projects of urban design, campus and regional planning

Zaferatos, Nicholas C.

396

EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0365: Draft Environmental Impact Statement for the EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico

397

DOE/EA-1861 DRAFT ENVIRONMENTAL ASSESSMENT FOR THE THE FRITO-LAY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT DRAFT ENVIRONMENTAL ASSESSMENT FOR THE THE FRITO-LAY BIOMASS BOILER PROJECT, BELOIT, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MAY 2011 DOE/EA-1861 iii May 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Assessment for the Frito-Lay Biomass Boiler Project, Beloit, Wisconsin (DOE/EA-1861) CONTACT: For more information about this Environmental Assessment (EA), please contact: Melissa Rossiter NEPA Document Manager U.S. Department of Energy Office of Energy Efficiency and Renewability Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 Facsimile: (720) 356-1560 E-mail: melissa.rossiter@go.doe.gov ABSTRACT: The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of

398

Environmental Resources of Selected Areas of Hawaii: Ecological Resources (DRAFT)  

SciTech Connect

This report has been prepared to make available and archive the background scientific data and related information collected on ecological resources during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (COE) published a notice in the Federal Register on May 17, 1994 (Fed. Regist. 5925638) withdrawing its Notice of Intent (Fed. Regst. 575433) of February 14, 1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. The background scientific data and related information presented in this report focus on several areas of Hawaii County, including the southeastern coast, a potential development corridor along the Saddle Road between Hilo and the North Kohala District on the northwestern coast, and on the southeastern coast of Maui. In this report, reference is made to these areas as study areas rather than as areas where proposed or alternative facilities of the HGP would be located. The resource areas addressed herein include terrestrial ecology, aquatic ecology, and marine ecology. The scientific background data and related information is being made available for future research in these areas. This report describes the environmental resources present in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts.

Trettin, C.C.; Tolbert, V.R.; Jones, A.T.; Smith, C.R.; Kalmijn, A.J.

1994-06-01T23:59:59.000Z

399

Draft Enivonmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

400

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiative Initiative DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S. manufacturing facility to produce the first U.S.-manufactured electric motor components and assemble electric drive units for hybrid and electric vehicles. This funding would be used for constructing a building of

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements (DOE/EIS-0385) (05/26/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

399 Federal Register 399 Federal Register / Vol. 71, No. 102 / Friday, May 26, 2006 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6675-6] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202-564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in the Federal Register dated April 7, 2006 (71 FR 17845). Draft EISs EIS No. 20060042, ERP No. D-NPS- E65079-TN, Great Smoky Mountains National Park General Management

402

Summary: Draft Uranium Leasing Program Programmatic Environmental Impact Statement: DOE/EIS 0472-D, March 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary: Draft ULP PEIS March 2013 Summary: Draft ULP PEIS March 2013 COVER SHEET 1 2 3 Lead Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: The cooperating agencies are U.S. Department of the Interior (DOI), 6 Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado 7 Department of Transportation (CDOT); Colorado Division of Reclamation, Mining, and Safety 8 (CDRMS); Colorado Parks and Wildlife (CPW); Mesa County Commission; Montrose County 9 Commission; San Juan County Commission; San Miguel County Board of Commissioners; the 10 Pueblo of Acoma Tribe; the Pueblo de Cochiti Tribe; the Pueblo de Isleta Tribe; the Navajo 11 Nation; and the Southern Ute Indian Tribe. 12 13 Title: Draft Uranium Leasing Program Programmatic Environmental Impact Statement 14

403

ENVIRONMENTAL ASSESSMENT FOR HAZARDOUS WASTE STAGING FACILITY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HAZARDOUS WASTE STAGING FACILITY HAZARDOUS WASTE STAGING FACILITY Project 39GF71024-GPDI21000000 . PANTEX PLANT AMARILLO, TEXAS DOE/EA-0688 JUNE 1993 MASTER DiSTRiBUTiON OF THIS DOCUMENT IS UNLIMITEI) ffrl TABLE OF CONTENTS Section Page 1.0 Need for Action 1 2.0 Description of Proposed Facility Action 3.0 Location of the Action 8 4.0 Alternatives to Proposed Action 9 4.1 No Action 9 4.2 Redesign and Modify Existing staging Facilities 9 4.3 Use Other Existing Space at Pantex Plant 9 4.4 Use Temporary Structures 9 4.5 Stage Waste at Other Sites 10 4.6 Stage Wastes Separately 10 5.0 Environmental Impacts of Proposed Action 10 5.1 Archeology 10 5.2 FloodplainlW etlands 10 5.3 Threatened and Endangered Species 10 5.4 Surrounding La,nd Use 11 5.5 Construction 11 5.6 Air Emissions 11

404

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

User Access Policy - Version 1.0 User Access Policy - Version 1.0 DOE NSRC User Access Policy December 9, 2002 page 1 DRAFT General Policies and Procedures for User Access to the DOE Nanoscale Science Research Centers 1. Preamble The mission of the U.S. Department of Energy (DOE) Nanoscale Science Research Centers (NSRCs) is to support users in doing outstanding science in a safe environment. To this end, each Center must have: * An array of state-of-the-art equipment and laboratories for synthesis, fabrication, characterization, and simulation of nanoscale materials and structures * A skilled staff to support this equipment, users, and the associated science but above all * A user scientific program that provides leadership in nanoscale science and technology This document addresses the policies and procedures for user access to the NSRCs.

405

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

406

Draft Environmental Impact Statement for FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0394D FUTUREGEN PROJECT EIS DOE/EIS-0394D FUTUREGEN PROJECT EIS DRAFT TABLE OF CONTENTS MAY 2007 i TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................ i LIST OF ACRONYMS ................................................................................... LIST OF ACRONYMS - 1 VOLUME I 1. PURPOSE AND NEED FOR AGENCY ACTION ......................................................................1-1 1.1 INTRODUCTION......................................................................................................................1-1 1.2 PROPOSED ACTION ...............................................................................................................1-1 1.3 PURPOSE AND NEED FOR AGENCY ACTION...................................................................1-2

407

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

SciTech Connect

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

408

EIS-0357: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

construction, and operation of the first power facility in the United States to use coal waste as feed to a gasification facility that subsequently generates fuel gas for clean...

409

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

⇒ ⇒ DRAFT 19 December 2012⇐= Status of the heaviest elements as of January 2013 Don Groom, Particle Data Group Superheavy elements are normally synthesized by exposing a high-Z target to a 2.5-7.5 MeV/u ion beam such as 48 Ca or 70 Zn. The target can be a stable isotope such as 208 Pb or 209 Bi; in this case the process is called cold fusion. If the target is radioactive (an actinide), it is a "hot fusion" reaction. Targets as heavy as 249 Bk have been used. Since fusion is followed by neutron loss (e.g. 248 Cf( 48 Ca,4n) 292 Lv), the atomic numbers of the beam and target nuclei determine whether the fusion products have even or odd Z. The main laboratories involved are at Dubna, Darmstadt, Berkeley, and RIKEN Nashina Center. Fusion cross sections steadily decrease with increasing Z, and are in the picobarn range for the heaviest elements. The cross section can be optimized for a given

410

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2003 July 1, 2003 EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line June 6, 2003 EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement Stockpile Stewardship and Management for a Modern Pit Facility June 2, 2003 EIS-0345: Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington June 2, 2003 EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project May 23, 2003 EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project May 15, 2003 EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los

411

EIS-0423-S1: Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

412

Field Calibration Facilities for Environmental Measurement of Radium,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Calibration Facilities for Environmental Measurement of Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) The first edition of this report, released in October 1982, presented physical-characteristic information for the various DOE radiologic-instrument calibration facilities located throughout the U.S. Three subsequent editions have been released in an effort to update information regarding the current status of the facilities. Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) More Documents & Publications Calibration Model Assignments expressed as U3O8, Summary Table ES-1 Field Calibration Facilities for Environmental Measurement of Radium,

413

EA-1914: Draft Site-Wide Environmental Assessment | Department...  

Office of Environmental Management (EM)

Facilities areas (Zone 1 and Zone 2); Increase site use and density by adding wind turbines, meteorological towers and associated infrastructure, and grid storage test...

414

EIS-0419: EPA Notice of Availability of the Draft Environmental...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Project, Construction and Operation of a 75-megawatt Wind Turbine Facility, City of White Salmon, Skamania County, WA EIS-0419-NOA-DEIS-2010.pdf More Documents & Publications...

415

EIS-0382: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

design and one-year operational demonstration of a coal-based, Integrated Gasification Combined Cycle (IGCC) electric generating facility on the Iron Range of northern...

416

EIS-0354: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Mitsubishi Corporation proposes to construct and operate a 500 Megawatt (MW) gas-fired electric power generating station in southern Clark County, Nevada. The facility...

417

EIS-0486: DOE Notice of Availability of Draft Environmental Impact...  

Office of Environmental Management (EM)

project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver...

418

DOE/EIS-0289; Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project, August 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA August 1999 U.S. DEPARTMENT OF ENERGY COVER SHEET August 1999 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, Federal Energy Technology Center, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@fetc.doe.gov.

419

Federal Register Notice for Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Fossil Energy of the Department of Energy announces the availability for public review and comment of the Draft Addendum To Environmental Review Documents Concerning Exports Of...

420

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE/EIS-03321: Condon Wind Project Draft Environmental Impact Statement (05/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Draft Environmental Impact Statement DOE/EIS-0321 CONDON WIND PROJECT Condon Wind Project Draft Environmental Impact Statement (DOE/EIS-0321) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Condon Wind Project States Involved: Oregon Abstract: BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource

422

EIS-0419: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Whistling Ridge Energy Project, Construction and Operation of a 75-megawatt Wind Turbine Facility, City of White Salmon, Skamania County, WA EIS-0419-NOA-DEIS-2010.pdf...

423

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS i TABLE OF CONTENTS 1. PURPOSE AND NEED FOR THE AGENCY ACTION...............................................................1-1 1.1 INTRODUCTION.....................................................................................................................1-1 1.2 FEDERAL ACTION .................................................................................................................1-1 1.3 PURPOSE AND NEED ............................................................................................................1-3 1.3.1 Purpose of Action.........................................................................................................1-3 1.3.2 Need for Action ............................................................................................................1-3

424

EIS-0469: EPA Notice of Availability of a Draft Environmental...  

Energy Savers (EERE)

environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to one of DOE's Western Area Power...

425

EA-1884: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

megawatts of wind generation, to Western's existing Wray Substation in Yuma County, Colorado. EA-1884-DEA-2012.pdf More Documents & Publications EA-1884: Final Environmental...

426

EA-1892: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards for Residential Furnaces and Residential Central Air Conditioners & Heat Pumps This EA evaluates the environmental impacts of a proposal by DOE to adopt...

427

EIS-0485: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near the city of O'Neill, Nebraska, to Western's power...

428

EA-1956: Draft Site-Wide Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

429

EA-1925: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOEEA-1925) Ormat Nevada, Inc.,...

430

-DRAFT-  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/NETL's Mercury Control Technology DOE/NETL's Mercury Control Technology R&D Program for Coal-Fired Power Plants Thomas J. Feeley, III 1. , James Murphy 2. , Jeffrey Hoffmann 2. , and Scott A. Renninger 1. 1. U.S. Department of Energy, National Energy Technology Laboratory 2. Science Applications International Corporation Abstract Mercury exists in trace amounts in coal. In the United States, coal-fired power plants emit about 48 tons of mercury and are the largest point source of emissions. The U.S. Environmental Protection Agency has determined the need to control mercury emissions from power plants. In addition, several legislative proposals have been introduced in the 108 th Congress to reduce mercury emissions from the electric-utility sector. Recognizing the potential for mercury regulations, the U.S. Department of Energy/National

431

-DRAFT-  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Effect of SCR NOx Control of the Effect of SCR NOx Control Technology on Mercury Speciation Thomas J. Feeley, III U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-6134 Fax: 412-386-4822 E-mail: thomas.feeley@netl.doe.gov Lynn A. Brickett U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-6574 Fax: 412-386-5917 E-mail: lynn.brickett@netl.doe.gov James T. Murphy Science Applications International Corporation 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-4115 Fax: 412-386-4516 E-mail: james.murphy@netl.doe.gov March 2003 Abstract The U.S. Environmental Protection Agency (EPA) performed an Information Collection Request

432

Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.  

SciTech Connect

Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

433

Utility Facility Siting and Environmental Protection Act (South Carolina) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Facility Siting and Environmental Protection Act (South Utility Facility Siting and Environmental Protection Act (South Carolina) Utility Facility Siting and Environmental Protection Act (South Carolina) < Back Eligibility Utility Commercial Investor-Owned Utility Industrial Construction Municipal/Public Utility Installer/Contractor Rural Electric Cooperative Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Siting and Permitting Provider South Carolina Public Service Commission This legislation applies to electric generating plants and associated facilities designed for or capable of operation at a capacity of more than 75 MW. A certificate from the Public Service Commission is required prior

434

DOE/EA-1310: Finding of No Significant Impact for the Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Couples Fast Reactivity Measurements Facility at the Idaho National Engineering and Environmental Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FOR THE DECONTAMINATION AND FINDING OF NO SIGNIFICANT IMPACT FOR THE DECONTAMINATION AND DISMANTLEMENT OF THE ADVANCED REACTIVITY MEASUREMENT FACILITY AND COUPLED FAST REACTIVITY MEASUREMENTS FACILITY AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Coupled Fast Reactivity Measurement Facility at the Idaho National Engineering and Environmental Laboratory" (DOE/EA-1310). The EA was prepared in accordance with the Council on Environmental Quality (CEQ) Regulations for implementing the National Environmental Policy Act (NEPA) (40 CFR 1500-1508), and the

435

2-2 Environmental Spectroscopy & Biogeochemistry Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

ES&B Overview ES&B Overview Environmental Spectroscopy & Biogeochemistry Facility The Environmental Spectroscopy & Biogeochemistry (ES&B) Facility focuses on environ- mental molecular science and application of the fundamental concepts of physical chemistry to the study of chemical reactions in heterogeneous natural materials, with an emphasis on soil and subsurface systems. The ES&B Facility staff, along with other Pacific Northwest National Laboratory (PNNL) staff, form a multidisciplinary organization with expertise in chemistry, mineral physics, geochemistry, soil chemistry, microbiology, hydrology, and environmental engineering. Capabilities are available for materials characterization, aqueous-phase and solid-phase speciation and reaction/kinetic measurements, analytical environmental chemistry, molecular

436

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This environmental impact statement (EIS) has been prepared by the U.S. Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), Council on Environmental Quality regulations for implementing NEPA (40 CFR Parts 1500-1508), and DOE NEPA regulations (10 CFR Part 1021). The EIS evaluates the potential environmental impacts associated with the construction and operation of a project which was proposed by Southern Company in partnership with the Orlando Utilities Commission (OUC) and which has been selected by DOE under the Clean Coal Power Initiative (CCPI) program. The proposed project would demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC)

437

EA-1617: Draft Environmental Assessment for Public Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Public Review Environmental Assessment for Public Review DOE/EA-1617 Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn County, Wyoming and Big Horn and Carbon Counties, Montana U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado Cooperating Agencies: U.S. Department of the Interior, National Park Service July 2011 Montana Department of Environmental Quality Environmental Assessment for Public Review DOE/EA-1617 Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado Cooperating Agencies:

438

EA-1968: Draft Site-Wide Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Site-Wide Environmental Assessment of the U.S. Department of Energys South Table Mountain (STM) Campus at the National Renewable Energy Laboratory (NREL), Golden, Colorado

439

Environmental Justice and Federal Facilities: Recommendations for Improving Stakeholder Relations Between Federal Facilities and Enviornmental Justice Communities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J J FEDERAL FACILITIES R IMPROVING S R BETWEEN FEDERAL F E JUSTICE COMMUNITIES October 2004 Prepared by the National Environmental Justice Advisory Council Waste and Facility Siting Subcommittee Federal Facilities Working Group NVIRONMENTAL USTICE AND ECOMMENDATIONS FOR TAKEHOLDER ELATIONS ACILITIES AND NVIRONMENTAL ENVIRONMENTAL JUSTICE AND FEDERAL FACILITIES RECOMMENDATIONS FOR IMPROVING STAKEHOLDER RELATIONS BETWEEN FEDERAL FACILITIES AND ENVIRONMENTAL JUSTICE COMMUNITIES October 2004 Prepared by the National Environmental Justice Advisory Council Waste and Facility Siting Subcommittee Federal Facilities Working Group ACKNOWLEDGMENTS The Federal Facilities Working Group of the National Environmental Justice Advisory Council's (NEJAC) Waste and Facility Siting Subcommittee wishes to acknowledge and thank the organizations and individuals

440

Environmental Survey preliminary report, Pantex Facility, Amarillo, Texas  

SciTech Connect

This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Pantex Facility, conducted November 3 through 14, 1986.The Survey is being conducted by an interdisciplinary team of environmental specialist, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Pantex Facility. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Pantex Facility, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory. When completed, the results will be incorporated into the Pantex Facility Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the Pantex Facility. 65 refs., 44 figs., 27 tabs.

Not Available

1987-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOE/EIS-0395; San Luis Rio Colorado Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

note: Missing pages contain figures which can be found in the "Figures" folder note: Missing pages contain figures which can be found in the "Figures" folder on the San Luis Rio Colorado Project Draft Environmental Impact Statement compact disc (CD). Some of the figures were removed from this file to decrease file size for ease of downloading and/or viewing. San Luis Rio Colorado Project Draft EIS I S SUMMARY The U.S. Department of Energy (DOE) received applications from North Branch Resources, LLC (NBR) and Generadora del Desierto S.A. de C.V. (GDD) for the proposed San Luis Rio Colorado Project (Proposed Project). GDD and NBR (collectively termed the Applicants) are each wholly owned subsidiaries of North Branch Holding, LLC. GDD applied to the Office of Electricity Delivery and Energy Reliability (OE), an organizational unit within DOE, for a

442

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

443

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

444

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Office of Environmental Management (EM)

a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental...

445

Near Facility Environmental Monitoring Quality Assurance Project Plan  

SciTech Connect

This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

MCKINNEY, S.M.

2000-05-01T23:59:59.000Z

446

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendices Appendices DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 SITING AND WETLAND 404(b)1 ALTERNATIVES ANALYSIS BP CHERRY POINT COGENERATION PROJECT [REVISED] Prepared for: BP West Coast Products, LLC Submitted by: Golder Associates Inc. March 2003 013-1421.541 March 2003 i 013-1421.541 TABLE OF CONTENTS Page No. 1. INTRODUCTION 1 2. PURPOSE AND NEED 5 3. ALTERNATIVES 6 3.1 No Action Alternative 6 3.1.1 Self-Reliance 6 3.1.2 Efficiency 6 3.1.3 Reliability 6 3.1.4 Other Impacts of the No Action Alternative 7 3.2 Project Site Location Alternative Selection Process 7 3.2.1 Sufficient Acreage Available

447

Draft Environmental Impact Statement for the Quartzsite Solar Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quartzsite Solar Energy Quartzsite Solar Energy Project and Proposed Yuma Field Office p Resource Management Plan Amendment DOE/EIS - 0440 L d A Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management , Yuma Field Office U.S. Army Corps of Engineers U.S. Army Garrison, Yuma Proving Grounds A i D f E i l Q li Arizona Department of Environmental Quality Arizona Game and Fish Department October 2011 This page intentionally left blank. ABSTRACT Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration (Western) Cooperating Agencies: Bureau of Land Management (BLM) Yuma Field Office (YFO), U.S. Army Corps of Engineers, U.S. Army Garrison - Yuma Proving Grounds, Arizona Game and

448

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

449

Transportation of radionuclides in urban environs: draft environmental assessment  

SciTech Connect

This report assesses the environmental consequences of the transportation of radioactive materials in densely populated urban areas, including estimates of the radiological, nonradiological, and social impacts arising from this process. The chapters of the report and the appendices which follow detail the methodology and results for each of four causative event categories: incident free transport, vehicular accidents, human errors or deviations from accepted quality assurance practices, and sabotage or malevolent acts. The numerical results are expressed in terms of the expected radiological and economic impacts from each. Following these discussions, alternatives to the current transport practice are considered. Then, the detailed analysis is extended from a limited area of New York city to other urban areas. The appendices contain the data bases and specific models used to evaluate these impacts, as well as discussions of chemical toxicity and the social impacts of radioactive material transport in urban areas. The latter are evaluated for each causative event category in terms of psychological, sociological, political, legal, and organizational impacts. The report is followed by an extensive bibliography covering the many fields of study which were required in performing the analysis.

Finley, N.C.; Aldrich, D.C.; Daniel, S.L.; Ericson, D.M.; Henning-Sachs, C.; Kaestner, P.C.; Ortiz, N.R.; Sheldon, D.D.; Taylor, J.M.

1980-07-01T23:59:59.000Z

450

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

451

Power Systems Development Facility. Environmental Assessment  

SciTech Connect

The objective of the PSDF would be to provide a modular facility which would support the development of advanced, pilot-scale, coal-based power systems and hot gas clean-up components. These pilot-scale components would be designed to be large enough so that the results can be related and projected to commercial systems. The facility would use a modular approach to enhance the flexibility and capability for testing; consequently, overall capital and operating costs when compared with stand-alone facilities would be reduced by sharing resources common to different modules. The facility would identify and resolve technical barrier, as well as-provide a structure for long-term testing and performance assessment. It is also intended that the facility would evaluate the operational and performance characteristics of the advanced power systems with both bituminous and subbituminous coals. Five technology-based experimental modules are proposed for the PSDF: (1) an advanced gasifier module, (2) a fuel cell test module, (3) a PFBC module, (4) a combustion gas turbine module, and (5) a module comprised of five hot gas cleanup particulate control devices. The final module, the PCD, would capture coal-derived ash and particles from both the PFBC and advanced gasifier gas streams to provide for overall particulate emission control, as well as to protect the combustion turbine and the fuel cell.

Not Available

1993-06-01T23:59:59.000Z

452

Final Environmental Impact Statement for the COB Energy Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PDX/041750002.DOC PDX/041750002.DOC Final Environmental Impact Statement for the COB Energy Facility DOE/EIS-0343 Bonneville Power Administration June 2004 PDX/041750002.DOC COB Energy Facility Project Final Environmental Impact Statement DOE/EIS-0343 Lead Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Interior, Bureau of Land Management (BLM) Title of Proposed Project: COB Energy Facility State Involved: Oregon Abstract: COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company (PERC), proposes to construct a 1,160-megawatt (MW) natural gas-fired, combined-cycle electric generating plant in Klamath County, Oregon, near the city of Bonanza. Electric power from the Energy Facility would enter the regional grid at BPA's Captain Jack Substation via a proposed 7.2-mile 500-kilovolt

453

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONSIBLE AGENCY: United States Department of Energy (DOE) RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE/EIS-0396) CONTACT: For further information on this PEIS, For general information on the DOE National write or call: Environmental Policy Act (NEPA) process, write or call: Mr. Francis Schwartz Carol Borgstrom, Director GNEP PEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Office of Nuclear Energy, NE-5 U.S. Department of Energy U.S. Department of Energy 1000 Independence Avenue, SW 1000 Independence Avenue, SW Washington, DC 20585 Washington, DC 20585 (202) 586-4600 (866) 645-7803 or leave a message at 1-800-472-2756 Abstract: The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the

454

Port Angeles-Juan de Fuca Transmission Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This summary includes information regarding the following elements of the draft environmental impact statement (EIS) prepared for the Port Angeles-Juan de Fuca Transmission Project: * purpose and need for action; * Proposed Action and No Action Alternative; and * affected environment, environmental impacts, and mitigation measures. S.1 Purpose and Need for Action Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to

455

EIS-0283DS Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Sheet Responsible Agency: United States Department of Energy (DOE) Title: Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement (Supplement) (DOE/EIS-0283-DS) Locations of Candidate Sites: Idaho, North Carolina, South Carolina, Texas, Virginia, and Washington Contacts: For further information on the Supplement contact: For further information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Office of Fissile Materials Disposition U.S. Department of Energy P.O. Box 23786 Washington, DC 20026-3786 Voice: (202) 586-5368 Ms. Carol Borgstrom, Director Office of NEPA Policy and Assistance Office of Environment, Safety and Health U.S. Department of Energy 1000 Independence Ave., SW

456

Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Import Statement, Richland, Washington - Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Link to Main Report Link to Main Report RESPONSIBLE AGENCY: COVER SHEET 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 U.S. Department of Energy, Richland Operations Office TITLE: Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Benton County, Washington (DOE/EIS-0286D2) CONTACT: For further information on this document, write or call: Mr. Michael S. Collins HSW EIS Document Manager Richland Operations Office U.S. Department of Energy, A6-38 P.O. Box 550 Richland, Washington 99352-0550 Telephone: (800) 426-4914 Fax: (509) 372-1926 Email: hsweis@rl.gov For further information on the Department's National Environmental Policy Act process,

457

Draft Environmental Impact Statement Klondike III/Biglow Canyon Wind Integration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary S-1 Summary S-1 Summary In this Summary: * Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the draft Environmental Impact Statement (EIS) prepared for the Klondike III/Biglow Canyon Wind Integration Project proposed by the Bonneville Power Administration (BPA). The project includes constructing a new double-circuit 230-kilovolt (kV) transmission line in northern Sherman County, Oregon. The new line would connect the Klondike III Wind Project and the Biglow Canyon Wind Farm to BPA's existing John Day 500-kV Substation. The project would also require expansion of BPA's existing John Day 500-kV Substation and a new 230-kV substation to integrate the two wind projects. As a federal agency, BPA is required by the National Environmental Policy Act

458

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

459

DOE/EIS-0222 Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Executive Summary Cover Sheet 1 2 3 Lead Federal Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: U.S. Department of the Interior (Bureau of Land Management, 6 Bureau of Reclamation, and U.S. Fish and Wildlife Service); Benton, Franklin, and Grant 7 counties; and the City of Richland 8 9 Consulting Tribal Governments: Nez Perce Tribe Department of Environmental Restoration 10 and Waste Management and the Confederated Tribes of the Umatilla Indian Reservation 11 12 Title: Revised Draft Hanford Remedial Action Environmental Impact Statement and 13 Comprehensive Land-Use Plan (HRA-EIS), Hanford Site, Richland, Washington 14 15 Contacts: For further information on this EIS call or contact: 16 17 Thomas W. Ferns, HRA-EIS Document Manager 18 U.S. Department of Energy, Richland Operations Office

460

Idaho National Engineering Laboratory Consolidated Transportation Facility. Environmental Assessment  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0822, addressing environmental impacts that could result from siting, construction, and operation of a consolidated transportation facility at the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The DOE proposes to construct and operate a new transportation facility at the Central Facilities Area (CFA) at the INEL. The proposed facility would replace outdated facilities and consolidate in one location operations that are conducted at six different locations at the CFA. The proposed facility would be used for vehicle and equipment maintenance and repair, administrative support, bus parking, and bus driver accommodation. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969, as amended. Therefore, the preparation of an environmental impact statement (EIS) is not required and the Department is issuing this finding of no significant impact.

Not Available

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility draft environmental" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

462

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental  

NLE Websites -- All DOE Office Websites (Extended Search)

3-S1: DOE Notice of Availability of a Draft Supplemental 3-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement (Mercury Storage SEIS, DOE/EIS-0423-S1) for public comment. As required by the Mercury Export Ban Act of 2008, DOE plans to identify a facility or facilities for the long-term management and storage of elemental mercury generated in the U.S. Subsequently, DOE identified three additional, reasonable alternative locations in the vicinity of its Waste Isolation

463

UMore Park Sand and Gravel Resources Project Draft Environmental Impact Statement (EIS), June 28, 2010 Errata Sheet  

E-Print Network (OSTI)

onsite receiving water impacts would meet existing MPCA criteria for deep lakes. #12;UMore Park Sand and Gravel Resources Project Draft Environmental Impact Statement (EIS), June 28 causes a reduction in the volume of storm water runoff reaching the Vermillion River. Table 17 summarizes

Netoff, Theoden

464

Haiti-Facility for Environmentally Friendly Transport Technology and  

Open Energy Info (EERE)

Haiti-Facility for Environmentally Friendly Transport Technology and Haiti-Facility for Environmentally Friendly Transport Technology and Measures (TRANSfer) Jump to: navigation, search Name Haiti-Facility for Environmentally Friendly Transport Technology and Measures (TRANSfer) Agency/Company /Organization Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Sector Climate Focus Area Renewable Energy Topics Adaptation, Low emission development planning Website http://transferproject.org/ Program Start 2010 Program End 2013 Country Haiti Caribbean References Transfer Project[1] Low-carbon Energy Roadmaps for the Greater Antilles[2] Program Overview The increasing levels of greenhouse gas emissions produced by road traffic in developing countries are becoming a greater problem in efforts to prevent climate change. The project aims to provide practical support to

465

Colombia-Facility for Environmentally Friendly Transport Technology and  

Open Energy Info (EERE)

Colombia-Facility for Environmentally Friendly Transport Technology and Colombia-Facility for Environmentally Friendly Transport Technology and Measures (TRANSfer) Jump to: navigation, search Name Colombia-Facility for Environmentally Friendly Transport Technology and Measures (TRANSfer) Agency/Company /Organization Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Sector Climate Focus Area Renewable Energy Topics Adaptation, Low emission development planning Website http://transferproject.org/ Program Start 2010 Program End 2013 Country Colombia South America References Transfer Project[1] Low-carbon Energy Roadmaps for the Greater Antilles[2] Program Overview The increasing levels of greenhouse gas emissions produced by road traffic in developing countries are becoming a greater problem in efforts to

466

Indonesia-Facility for Environmentally Friendly Transport Technology and  

Open Energy Info (EERE)

Indonesia-Facility for Environmentally Friendly Transport Technology and Indonesia-Facility for Environmentally Friendly Transport Technology and Measures (TRANSfer) Jump to: navigation, search Name Indonesia-Facility for Environmentally Friendly Transport Technology and Measures (TRANSfer) Agency/Company /Organization Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Sector Climate Focus Area Renewable Energy Topics Adaptation, Low emission development planning Website http://transferproject.org/ Program Start 2010 Program End 2013 Country Indonesia South-Eastern Asia References Transfer Project[1] Low-carbon Energy Roadmaps for the Greater Antilles[2] Program Overview The increasing levels of greenhouse gas emissions produced by road traffic in developing countries are becoming a greater problem in efforts to

467

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

468

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project April 9, 2010 EIS-0404: Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California April 9, 2010 EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA April 1, 2010 EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota February 19, 2010 EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South January 29, 2010 EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury January 1, 2010 EIS-0418: Draft Environmental Impact Statement

469

DOE/EIS-0303D; High-Level Waste Tank Closure Draft Environmental Impact Statement (November 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0303D EIS-0303D DRAFT November 2000 Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, High-Level Waste Tank Closure Draft Environmental Impact Statement (DOE/EIS-0303D), Aiken, SC. CONTACT: For additional information or to submit comments on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm For general information on the process that DOE follows in complying with the National Environmental

470

Design and Drafting  

NLE Websites -- All DOE Office Websites (Extended Search)

Email Portal (Zimbra)* Email Portal (Zimbra)* * Operations Logbook* * Project Proposal System* * ICMS * Safety and Training * ANL ESQ Training * APS Phone Directory * Resources & Information* * Internal link Design and Drafting Group The Advanced Photon Source (APS) at Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The AES Design and Drafting Group supports the ASD and AES divisions' continued improvement of the accelerator as well as the scientific

471

Supplemental results of the human health risk analysis for the U.S. Department of Energy draft waste management programmatic environmental impact statement  

SciTech Connect

This report is intended as an information supplement to the human health risk analysis performed for the US Department of Energy`s Draft Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste, hereinafter called the PEIS. This report provides the installation-by-installation human health risk analysis results from which the risk estimate summaries for the PEIS were drawn. Readers should bear in mind that the risk estimates presented here are the result of a program-wide (as opposed to site-specific) study. They are based on best available data; systematically applied assumptions; and professional judgment about DOE waste inventories, waste volumes generated annually, currently available treatment and disposal technologies, technical limitations of treatment, and facility capacities across the numerous installations in the DOE complex.

NONE

1995-08-01T23:59:59.000Z

472

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

473

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

474

Managing Complex Environmental Remediation amidst Aggressive Facility Revitalization Milestones  

SciTech Connect

Unlike the final closure projects at Rocky Flats and Fernald, many of the Department of Energy's future CERCLA and RCRA closure challenges will take place at active facilities, such as the Oak Ridge National Laboratory (ORNL) central campus. ORNL has aggressive growth plans for a Research Technology Park and cleanup must address and integrate D and D, soil and groundwater remediation, and on-going and future business plans for the Park. Different planning and tracking tools are needed to support closures at active facilities. To support some large Airport redevelopment efforts, we created tools that allowed the Airline lease-holder to perform environmental remediation on the same schedule as building D and D and new building construction, which in turn allowed them to migrate real estate from unusable to usable within an aggressive schedule. In summary: The FIM and OpenGate{sup TM} spatial analysis system were two primary tools developed to support simultaneous environmental remediation, D and D, and construction efforts at an operating facility. These tools helped redevelopers to deal with environmental remediation on the same schedule as building D and D and construction, thereby meeting their goals of opening gates, restarting their revenue streams, at the same time complying with all environmental regulations. (authors)

Richter Pack, S. [PMP Science Applications International Corporation, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

475

Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.  

SciTech Connect

BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

476

Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington  

SciTech Connect

This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

Not Available

1994-07-01T23:59:59.000Z

477

Preliminary Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

478

Naval Reactors Facility Environmental Monitoring Report, Calendar Year 2003  

SciTech Connect

The results of the radiological and nonradiological environmental monitoring programs for 2003 at the Naval Reactors Facility are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U.S. Environmental Protection Agency and the U.S. Department of Energy.

None

2003-12-31T23:59:59.000Z

479

Sandia National Laboratories, California proposed CREATE facility environmental baseline survey.  

SciTech Connect

Sandia National Laboratories, Environmental Programs completed an environmental baseline survey (EBS) of 12.6 acres located at Sandia National Laboratories/California (SNL/CA) in support of the proposed Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) Facility. The survey area is comprised of several parcels of land within SNL/CA, County of Alameda, California. The survey area is located within T 3S, R 2E, Section 13. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contaminat