National Library of Energy BETA

Sample records for facility bonneville county

  1. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 delete me old download page duplicate

  2. EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

  3. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville...

    Office of Environmental Management (EM)

    1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 delete me old download page ...

  4. EIS-0048-S: Bonneville Power Administration Proposed FY 1976 Program Facility Location, Okanogan Area Service, Douglas and Okanogan Counties, WA, Supplemental

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this facility location supplemental statement to address a proposal for transmission facilities to serve the Okanogan Valley, Washington. This statement is a supplement to Department of the Interior FES 75-79.

  5. Bonneville County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Inc Places in Bonneville County, Idaho Ammon, Idaho Idaho Falls, Idaho Iona, Idaho Irwin, Idaho Ririe, Idaho Swan Valley, Idaho Ucon, Idaho Retrieved from "http:...

  6. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  7. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  8. Kent County Waste to Energy Facility Biomass Facility | Open...

    Open Energy Info (EERE)

    County Waste to Energy Facility Biomass Facility Jump to: navigation, search Name Kent County Waste to Energy Facility Biomass Facility Facility Kent County Waste to Energy...

  9. DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the

  10. Hillsborough County Resource Recovery Biomass Facility | Open...

    Open Energy Info (EERE)

    Facility Hillsborough County Resource Recovery Sector Biomass Facility Type Municipal Solid Waste Location Hillsborough County, Florida Coordinates 27.9903597, -82.3017728...

  11. Ocean County Landfill Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    County Landfill Biomass Facility Jump to: navigation, search Name Ocean County Landfill Biomass Facility Facility Ocean County Landfill Sector Biomass Facility Type Landfill Gas...

  12. San Diego County- Design Standards for County Facilities

    Broader source: Energy.gov [DOE]

    The San Diego County Board of Supervisors established design standards for county facilities and property. Among other requirements,  the policy requires that all new county buildings or major...

  13. EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

  14. Montgomery County Resource Recovery Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Montgomery County Resource Recovery Biomass Facility Jump to: navigation, search Name Montgomery County Resource Recovery Biomass Facility Facility Montgomery County Resource...

  15. Hyde County- Wind Energy Facility Ordinance

    Broader source: Energy.gov [DOE]

    Hyde County, located in eastern North Carolina, adopted a wind ordinance in 2008 to regulate the use of wind energy facilities throughout the county, including waters within the boundaries of Hyde...

  16. Tyrrell County- Wind Energy Facility Ordinance

    Broader source: Energy.gov [DOE]

    Tyrrell County, located in northeastern North Carolina, adopted a wind ordinance in 2009 to regulate the use of wind energy facilities in the unincorporated areas of the county. The ordinance is...

  17. Miami Dade County Resource Recovery Fac Biomass Facility | Open...

    Open Energy Info (EERE)

    Resource Recovery Fac Biomass Facility Facility Miami Dade County Resource Recovery Fac Sector Biomass Facility Type Municipal Solid Waste Location Miami-Dade County, Florida...

  18. North County Regional Resource Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Facility Facility North County Regional Resource Sector Biomass Facility Type Municipal Solid Waste Location Palm Beach County, Florida Coordinates 26.6514503, -80.2767327 Show...

  19. Lake County Ag Park Greenhouse Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Ag Park Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Lake County Ag Park Greenhouse Low Temperature Geothermal Facility Facility Lake County Ag...

  20. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River ...

  1. Bonneville_Power_Administration

    Office of Environmental Management (EM)

    Hooper Springs Transmission Project 1 Record of Decision March 2015 Bonneville Power Administration's Hooper Springs Transmission Project Record of Decision March 2015 Decision Bonneville Power Administration (BPA) has decided to construct and operate the Hooper Springs Transmission Project in Caribou County, Idaho. As described in the Hooper Springs Transmission Project Final Environmental Impact Statement (DOE/EIS-0451, January 2015), this project consists of: (1) a new 138/115-kilovolt (kV)

  2. PP-46 Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Bonneville Power Administration to contruct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

  3. EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental

    Broader source: Energy.gov [DOE]

    This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

  4. SOLAR PANELS ON HUDSON COUNTY FACILITIES

    SciTech Connect (OSTI)

    BARRY, KEVIN

    2014-06-06

    This project involved the installation of an 83 kW grid-connected photovoltaic system tied into the energy management system of Hudson County's new 60,000 square foot Emergency Operations and Command Center and staff offices. Other renewable energy features of the building include a 15 kW wind turbine, geothermal heating and cooling, natural daylighting, natural ventilation, gray water plumbing system and a green roof. The County intends to seek Silver LEED certification for the facility.

  5. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  6. EA-1913: Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal by DOE’s Bonneville Power Administration to fund the Idaho Department of Fish and Game (IDFG) to modify existing facilities at the Springfield Hatchery, located in Bingham County, Idaho.

  7. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2013 (Revised 060914) United States Department of Energy Bonneville Power Administration 905 N.E. 11th Avenue Portland, OR 97232 Bonneville Power Administration's 2014...

  8. EIS-0221: Proposed York County Energy Partners Cogeneration Facility, York County, PA

    Broader source: Energy.gov [DOE]

    The Department of Energy prepared this environmental impact statement to assess the environmental and human health impacts associated with construction and operation of the York County Energy Partners, L.P. Cogeneration Facility on a 38- acre parcel in North Codorus Township, York County, Pennsylvania.

  9. Evaluation of a Low-Cost Salmon Production Facility; 1988 Annual Report.

    SciTech Connect (OSTI)

    Hill, James M.; Olson, Todd

    1989-05-01

    This fiscal year 1988 study sponsored by the Bonneville Power Administration evaluates an existing, small-scale salmon production facility operated and maintained by the Clatsop County Economic Development Committee's Fisheries Project.

  10. the Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12, 535,000 to the reclamation fund in the United States Treasury for the ac- count of Columbia Basin Project, Yakima Project...

  11. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    agreement (Agreement) between the BC Hydro and Power uthority (BCH) and the Bonneville Power Administration (BP A), jointly the Parties, which BA for accounting purposes is...

  12. EA-2023: Crossman Peak Communications Facility; Mohave County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of a proposed new microwave communication facility to be located adjacent to a privately-owned one near Crossman Peak, east of Lake Havasu City in Mohave County, Arizona. The proposal would consist of a microwave communication facility, an access road, and an approximately 8-mile electrical service distribution line across private land and land administered by the Bureau of Land Management.

  13. Knox County Detention Facility Goes Solar for Heating Water

    Broader source: Energy.gov [DOE]

    Hot water demand soars at the six-building Knox County Detention Facility in Tennessee. It's open 24/7 with 1,036 inmate beds and 4,500 meals served daily—and don't forget the laundry.

  14. EA-1957: Cabin Creek Biomass Facility, Placer County, California

    Broader source: Energy.gov [DOE]

    DOE is proposing to provide funding to Placer County, California to construct and operate a two-megawatt wood-to-energy biomass facility at the Eastern Regional Materials Recovery Facility (MRF) and Landfill in unincorporated Placer County. The wood‐to‐energy biomass facility would use a gasification technology. The fuel supply for the proposed project would be solely woody biomass, derived from a variety of sources including hazardous fuels residuals, forest thinning and harvest residuals, and Wildland Urban Interface sourced waste materials from residential and commercial property defensible space clearing and property management activities. NOTE: After review of a final California Environmental Quality Act Environmental Impact Report, DOE has determined that preparation of an EA is not necessary. The propsed action fits within DOE's categorical exclusion B5.20. Therefore, this EA is cancelled.

  15. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1,NT OF Bonneville Power Administration P.O Box 3621 Portland, Oregon 97208-3621 PUBLIC AFFAIRS March 10, 2010 In reply refer to: DK-7 Tom Jacobs Ex RE: BPA-2010-01030-F Dear Mr....

  16. Orange County Government Solar Demonstration and Research Facility

    SciTech Connect (OSTI)

    Parker, Renee; Cunniff, Lori

    2015-05-12

    Orange County Florida completed the construction of a 20 kilowatt Solar Demonstration and Research Facility in March 2015. The system was constructed at the Orange County/University of Florida Cooperative Extension Center whose electric service address is 6021 South Conway Road, Orlando, Florida 32802. The Solar Demonstration and Research Facility is comprised of 72 polycrystalline photovoltaic modules and 3 inverters which convert direct current from the solar panels to alternating current electricity. Each module produces 270 watts of direct current power, for a total canopy production of just under 20,000 watts. The solar modules were installed with a fixed tilt of 5 degrees and face south, toward the equator to maximize the amount of sunlight captures. Each year, the electricity generated by the solar array will help eliminate 20 metric tons of carbon dioxide emissions as well as provide covered parking for staff and visitors vehicles. The solar array is expected to generate 27,000 kilowatt hours of electricity annually equating to an estimated $266 savings in the monthly electric bill, or $3,180 annually for the Orange County/University of Florida Cooperative Extension Center. In addition to reducing the electric bill for the Extension Center, Orange County’s solar array also takes advantage of a rebate incentive offered by the local utility, Orlando Utility Commission, which provided a meter that measures the amount of power produced by the solar array. The local utility company’s Solar Photovoltaic Production Incentive will pay Orange County $0.05 per kilowatt hour for the power that is produced by the solar array. This incentive is provided in addition to Net Metering benefits, which is an effort to promote the use of clean, renewable energy on the electric grid. The Photovoltaic Solar Demonstration and Research Facility also serves an educational tool to the public; the solar array is tied directly into a data logger that provides real time power

  17. EIS-0030-S: Bonneville Power Administration Proposed FY 1980 Program, Facility Location Supplement, Northwest Montana/North Idaho Support and Libby Integration, Supplemental

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this supplemental statement to evaluate the environmental impacts of proposed alternative actions to alternative actions intended to address the need for reliability of electrical service to loads in Northwest Montana and North Idaho and the need for integrating the generation being added at Libby Dam into the Federal Columbia River Power System.

  18. PIA - Bonneville Power Adminstration Ethics Helpline | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline Hosted and operated by ...

  19. Bonneville upgrades lines

    SciTech Connect (OSTI)

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  20. EA-1693: Transmission Services Facility, Clark County, Washington

    Broader source: Energy.gov [DOE]

    DOE will prepare an EA to evaluate the potential environmental impacts from the proposed three-to-five story office building that would be constructed to meet the Leadership in Energy and Environmental Design (LEED) Gold standard in energy efficiency and sustainability, near Bonneville Power Administration’s (BPA) existing Dittmer Building.

  1. Bonneville Power Administration (Bonneville, BPA) Proposed Appropriati...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    96 - 501) for energy conservation, renewable energy resources, investment in capital fish facilities, and other purposes, the American Recovery and Reinvestment Act of 2009...

  2. PP-10 Bonneville Power Administrator | Department of Energy

    Energy Savers [EERE]

    Bonneville Power Administrator PP-10 Bonneville Power Administrator Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric ...

  3. PP-36 Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration PP-36 Bonneville Power Administration Presidential Permit authorizing Bonneville Power Administration to construct, operate, and maintain electric ...

  4. EECBG Success Story: Knox County Detention Facility Goes Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    solar array at the T.K. Davis Justice Center in Opelika, Ala. | Photo courtesy of Lee County Commission EECBG Success Story: Alabama Justice Center Expands its Solar...

  5. Bonneville Power Admin | Open Energy Information

    Open Energy Info (EERE)

    Bonneville Power Administration) Jump to: navigation, search Name: Bonneville Power Admin Place: Oregon Phone Number: 1-800-282-3713 Website: www.bpa.govContactPagesdefa...

  6. Bonneville Power Administration Program Specific Recovery Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan PDF icon Microsoft Word - PSRP May 15 2009 BPA ...

  7. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (BPA) transmission line and right-of-way, does not belong to BPA. The record is the property of the Public Utility District Number One of Klickitat County, Washington. As the...

  8. EA-1996: Glass Buttes Radio Station, Lake County, Oregon | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Glass Buttes Radio Station, Lake County, Oregon EA-1996: Glass Buttes Radio Station, Lake County, Oregon SUMMARY The Bureau of Land Management (BLM), with DOE's Bonneville Power...

  9. Reading File Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reading File Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES In reply refer to: PG-5 Ms. Renata Kurschner Director, Generation Resource...

  10. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program - March 2014 | Department of Energy Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of

  11. Bonneville Power Administration

    Broader source: Energy.gov (indexed) [DOE]

    138115-kilovolt (kV) Hooper Springs Substation that will be located near the city of ... north then east from the Hooper Springs Substation to a new BPA connection facility that ...

  12. EA-2023: Crossman Peak Communications Facility; Mohave County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Western Area Power Administration is preparing an EA ... proposed new microwave communication facility to be located ... service distribution line across private land and ...

  13. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303–326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 7–8 existing substations.

  14. Categorical Exclusion Determinations: Bonneville Power Administration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD December 11, 2015 CX-014364: Categorical Exclusion Determination Radio Upgrades at Franklin, Nine Mile, and Walla Walla Substations CX(s) Applied: B1.19 Date: 12/11/2015 Location(s): Washington Offices(s): Bonneville Power Administration December 10, 2015

  15. EECBG Success Story: Knox County Detention Facility Goes Solar for Heating Water

    Broader source: Energy.gov [DOE]

    Hot water demand soars at the six-building Knox County Detention Facility in Tennessee. It's open 24/7 with 1,036 inmate beds and 4,500 meals served daily—and don't forget the laundry. Learn more.

  16. Power County | Open Energy Information

    Open Energy Info (EERE)

    County Jump to: navigation, search Name Power County Facility Power County Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner CG Power...

  17. EA-1990: Ridgenose Solar Energy Interconnection Facility, Mohave County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Desert Southwest Region) is preparing an EA that will assess the potential environmental impacts of a proposal to interconnect the planned Ridgenose Solar Energy Project to Western’s transmission system. Western’s actions could include constructing less than a mile of new transmission line from the solar facility to an existing substation, constructing an interconnection substation, and adding, moving, or modifying structures.

  18. EA-1694: Department of Energy Loan Guarantee to Highlands Ethanol, LLC, for the Cellulosic Ethanol Facility in Highlands County, Florida

    Broader source: Energy.gov [DOE]

    This EA will evaluate the environmental impacts of a proposal to issue a Federal loan guarantee to Highlands Ethanol, LLC, for a cellulosic ethanol facility in Highlands County, Florida. This EA is on hold.

  19. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the stringent requirements for accreditation set by the Right-of-Way Stewardship Council Portland, Ore. - Bonneville Power Administration was recognized recently for...

  20. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services Portland, Ore. - The Bonneville Power Administration has selected Mike Miller to be its vice president of Engineering and Technical Services. He will begin his new...

  1. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  2. Bonneville Power Administration, Oregon Energy Northwest, Washington...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration, Oregon Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpo...

  3. EIS-0419: Whistling Ridge Energy Project; Skamania County, Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0419: Whistling Ridge Energy Project; Skamania County, Washington Summary DOE's Bonneville Power Administration prepared an EIS that evaluates the potential environmental ...

  4. Land Record System PIA, Bonneville Power Administration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration (61.28 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  5. PP-10-1 Bonneville Power Administrator | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -1 Bonneville Power Administrator PP-10-1 Bonneville Power Administrator Presidential ... at the U.S-Canada border. PDF icon PP-10-1 Bonneville Power Administrator More ...

  6. Gray County Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Gray County Wind Farm Jump to: navigation, search Name Gray County Wind Farm Facility Gray County Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status...

  7. Audit of Bonneville Power Administration's Management of Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration's Management of Information Resources, WR-B-96-06 Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06 ...

  8. STATEMENT OF MR. ELLIOT E. MAINZER ADMINISTRATOR BONNEVILLE POWER...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Bonneville also invests to fulfill regional commitments for energy efficiency and fish and ... Fish and Wildlife Bonneville's strategy for mitigating the impact of the FCRPS on fish and ...

  9. Sumner County Solid-Waste Energy Recovery Facility. Volume 2. Performance and environmental evaluation. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    This report summarizes the operation of the Sumner County Solid Waste Energy Recovery Facility for a 2-year period, beginning with initial operation of the plant in December 1981. The 200-ton/day facility is located at Gallatin, Tennessee, and converts municipal solid waste into steam and eletricity. The report addresses physical and chemical properties of process and waste streams, other operating factors including thermal efficiency and availability, and the initial operating expenses and revenues. Two series of tests were carried out approximately one year apart. An environmental analysis was performed to determine the potential solids, liquid, and gaseous emissions from the plant. The results of the testing will be of interest to others who may be considering a resource recovery facility for the production of energy. The principal conclusions of the report are: The initial operation of the facility has been satisfactory. The ash drag system and air pollution control device must be extensively modified. Waste quantities and steam sales have been less than predicted causing some economic difficulties. Cadmium and lead concentrations in the ash have been high (especially fly ash). The long-range outlook for the facility continues to be optimistic. 10 refs., 6 figs., 34 tabs.

  10. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  11. EIS-0076: Bonneville Power Administration Alumax

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) developed this EIS for the proposed Alumax primary aluminum reduction plant to determine the environmental, economic and social impacts of plant construction, as well as potential power supply alternatives for BPA.

  12. BONNEVILLE POWER ADNMINSTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    annual U.S. Treasury payment on time and in full Portland, Ore. - The Bonneville Power Administration today announced that it completed its 32 nd consecutive annual payment to...

  13. EIS-0183: Bonneville Power Administration Business Plan

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration is considering how to respond to the challenges of a dynamic electric utility industry, and prepared this environmental impact statement to analyze environmental and socioeconomic impacts associated with alternatives to address this challenge.

  14. EIS-0005: Bonneville Power Administration FY 1979 Program

    Broader source: Energy.gov [DOE]

    This final statement is one of a series prepared annually by BPA on each fiscal year's proposed construction and maintenance program. This statement covers the potential impact of the major new facilities and maintenance programs proposed for fiscal year 1979. It must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The ""Role EIS""), particularly Appendix B - BFA Power Transmission.

  15. Lycoming County, Pennsylvania: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    in Lycoming County, Pennsylvania Koopers Susquehanna Plant Biomass Facility Montgomery Biomass Facility Places in Lycoming County, Pennsylvania Duboistown, Pennsylvania...

  16. EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high-voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

  17. Bonneville Power Administration 1998 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  18. Bonneville Power Administration 1991 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  19. Continuity of Operations at Bonneville Power Administration, IG-0781 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Continuity of Operations at Bonneville Power Administration, IG-0781 Continuity of Operations at Bonneville Power Administration, IG-0781 In the event of a major disruption to its nonnal operations, Bonneville must be prepared to continue its essential functions, particularly its power scheduling, tra~lsmission scheduling, and system operations. In this regard, Bonneville is required to follow Federal Preparedness Circular 65 (FPC 65), as prescribed by the Department of

  20. 2014 Annual Planning Summary for the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Bonneville Power Administration.

  1. 2012 Annual Planning Summary for Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Bonneville Power Administration.

  2. Energy Department Names Elliot Mainzer Bonneville Power Administration Administrator

    Broader source: Energy.gov [DOE]

    The Energy Department announced that Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA).

  3. Comments of the Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Bonneville Power Administration Comments of the Bonneville Power Administration BPA appreciates the opportunity to provide comments and information and submits the following comments in response to the DOE RFI. Comments of the Bonneville Power Administration (133.04 KB) More Documents & Publications RE: NBP RFI: Communication Requirements CX-001184: Categorical Exclusion Determination Communications Requirements of Smart Grid Technologies

  4. Brown County Wind | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Brown County Wind Facility Brown County Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Adams Electric...

  5. Winona County Wind | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Winona County Wind Facility Winona County Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Juhl Wind...

  6. Franklin County Wind LLC | Open Energy Information

    Open Energy Info (EERE)

    search Name Franklin County Wind LLC Facility Franklin County Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Franklin...

  7. Distribution: Sonya Baskerville, Bonneville Power Administration, Liaison

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distribution: Sonya Baskerville, Bonneville Power Administration, Liaison Karen Boardman, Health Safety and Security, Director, National Training Center Robert Corbin, Fossil Energy, DAS, FE-4 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy

  8. Bonneville Power Ampere Annex Z-995 Building

    High Performance Buildings Database

    Vancouver, WA The Bonneville Power Administration (BPA), a federal agency headquartered in Portland, Oregon, provides about half of the electricity used in the Pacific Northwest and operates more than three-fourths of the region's high-voltage transmission. Because BPA markets power at cost from 31 federal dams, its rates are among the least expensive electricity in the country. The Ampere Annex project is a renovation of an exisiting 60-year-old standard warehouse building located within the Ross Complex.

  9. Wheelabrator Millbury Facility Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Facility Facility Wheelabrator Millbury Facility Sector Biomass Facility Type Municipal Solid Waste Location Worcester County, Massachusetts Coordinates 42.4096528, -71.8571331...

  10. Lackawanna County, Pennsylvania: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Archbald Power Station Biomass Facility Keystone Landfill Biomass Facility Taylor Energy Partners LP Biomass Facility Places in Lackawanna County, Pennsylvania...

  11. 2011 Annual Planning Summary for Bonneville Power Administration (BPA) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Annual Planning Summary for Bonneville Power Administration (BPA) 2011 Annual Planning Summary for Bonneville Power Administration (BPA) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2011 Annual Planning Summary for Bonneville Power Administration

  12. DOE Names Bill Drummond As New Bonneville Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrator | Department of Energy Bill Drummond As New Bonneville Power Administration Administrator DOE Names Bill Drummond As New Bonneville Power Administration Administrator January 16, 2013 - 7:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department has chosen Bill Drummond to be the new Administrator for the Bonneville Power Administration (BPA), one of the four Power Marketing Administrations (PMAs) the Department oversees. As BPA's Administrator, Drummond

  13. Mower County Wind Energy Center | Open Energy Information

    Open Energy Info (EERE)

    Mower County Wind Energy Center Jump to: navigation, search Name Mower County Wind Energy Center Facility Mower County Wind Energy Center Sector Wind energy Facility Type...

  14. U. S. DEPARTMENT OF THE INTERIOR * BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12,535,000 to the rechunation fund in the United States Treasury for the ac- count of Columbia Basin Project. Yakima Project...

  15. 2013 Annual Planning Summary for the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Bonneville Power Administration.

  16. PR 01-16 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in the spring. Chum salmon generally spawn in the lower part of the Columbia River below Bonneville Dam, preferring tributaries where warm ground water pushes up through spawning...

  17. EIS-0030: Bonneville Power Administration's Proposed FY 1980 Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to evaluate the environmental impacts of the proposed fiscal year 1980 construction and maintenance program.

  18. STATEMENT OF CLAUDIA ANDREWS CHIEF OPERATING OFFICER BONNEVILLE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... This payment marked the 32 nd consecutive year that Bonneville has made its scheduled ... Additionally, BPA sets rates based on a Treasury Payment Probability of 95% over the ...

  19. Overview of the Performance of PIT-Tag Interrogation Systems for Adult Salmonids at Bonneville and McNary Dams, 2002.

    SciTech Connect (OSTI)

    Downing, Sandra L.; Prentice, Earl F.

    2003-06-01

    During winter 2001, the U.S. Army Corps of Engineers (Corps) and Bonneville Power Administration (BPA) installed a prototype orifice-based PIT-tag interrogation system into the Washington Shore Ladder at Bonneville Dam (BWSL). Detectors were installed into 12 weirs: 4 downstream (Weirs 334-337) and 8 upstream (Weirs 352-359) from the fish release point (i.e., the exit ladder for the Adult Fish Facility). NOAA Fisheries (National Marine Fisheries Service--NMFS) tagged and released salmonids during 2001 to determine tag-reading efficiencies for different salmonid populations. Data analyses focused on the upper eight weirs. The 2001 tagging results for spring chinook salmon indicated that having detectors in four consecutive weirs would have been sufficient to yield a reading efficiency of 95%. The BWSL orifice-based system performed well until the coho and fall chinook salmon migrations began. Coho and fall chinook salmon appeared to use the weir overflows, and thus avoid detection, at much higher rates than biologists expected. During 2001, technology advances led to the development of significantly larger antennas than had been available earlier, and thus it was possible to build antennas of approximately 2 x 6 ft. Consequently, it became feasible to design interrogation systems for ladder locations where all fish would have to go through the antennas and thus could not avoid detection by using the weir overflows (Fig. 1). Destron Technologies by Digital Angel designed a prototype interrogation system with two antennas that was installed into the counting-window area in the Oregon Ladder at McNary Dam, where its performance could then be directly compared to that of the orifice-based system in the same ladder. Although the orifice-based systems appeared less effective than the fisheries community wanted for fall chinook and coho salmon, the decision was made to proceed with installations planned for Bonneville and McNary Dams because valuable data would still be

  20. eGIS Portal PIA, Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration (395.19 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant

  1. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wash. * Shahala Middle School, Vancouver, Wash. * Pierce County Home School Club, Milton, Wash. BPA sponsors the science bowl to showcase students' talents in science,...

  2. Litchfield County, Connecticut: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Energy Capital Energy Generation Facilities in Litchfield County, Connecticut New Milford Gas Recovery Biomass Facility Places in Litchfield County, Connecticut Bantam,...

  3. Delaware County, Pennsylvania: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Capital Partners Energy Generation Facilities in Delaware County, Pennsylvania American Ref-Fuel of Delaware Valley Biomass Facility Places in Delaware County, Pennsylvania Aldan,...

  4. Klickitat County, Washington: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Zone Subtype B. Energy Generation Facilities in Klickitat County, Washington Roosevelt Biogas 1 Biomass Facility Places in Klickitat County, Washington Bickleton, Washington...

  5. Lebanon County, Pennsylvania: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Zone Subtype A. Energy Generation Facilities in Lebanon County, Pennsylvania Lebanon Methane Recovery Biomass Facility Places in Lebanon County, Pennsylvania Annville,...

  6. Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8, 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year

  7. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  8. Bonneville Project: CFD of the Spillway Tailrace

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  9. Colusa County, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Generation Facilities in Colusa County, California Wadham Energy LP Biomass Facility Williams Biomass Facility Places in Colusa County, California Arbuckle, California Colusa,...

  10. Grant County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Number 5 Climate Zone Subtype B. Energy Generation Facilities in Grant County, Oregon Co-Gen LLC Biomass Facility Prairie City Biomass Facility Places in Grant County, Oregon...

  11. Douglas County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    4 Climate Zone Subtype C. Energy Generation Facilities in Douglas County, Oregon Co-Gen II LLC Biomass Facility Riddle Biomass Facility Places in Douglas County, Oregon...

  12. Polk County, Iowa: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    IRFA Iowa Stored Energy Park Energy Generation Facilities in Polk County, Iowa Metro Methane Recovery Facility Biomass Facility Places in Polk County, Iowa Alleman, Iowa Altoona,...

  13. Environmental assessment for the Strategic Petroleum Reserve Big Hill facility storage of commercial crude oil project, Jefferson County, Texas

    SciTech Connect (OSTI)

    1999-03-01

    The Big Hill SPR facility located in Jefferson County, Texas has been a permitted operating crude oil storage site since 1986 with benign environmental impacts. However, Congress has not authorized crude oil purchases for the SPR since 1990, and six storage caverns at Big Hill are underutilized with 70 million barrels of available storage capacity. On February 17, 1999, the Secretary of Energy offered the 70 million barrels of available storage at Big Hill for commercial use. Interested commercial users would enter into storage contracts with DOE, and DOE would receive crude oil in lieu of dollars as rental fees. The site could potentially began to receive commercial oil in May 1999. This Environmental Assessment identified environmental changes that potentially would affect water usage, power usage, and air emissions. However, as the assessment indicates, changes would not occur to a major degree affecting the environment and no long-term short-term, cumulative or irreversible impacts have been identified.

  14. Steam plant ash disposal facility and industrial landfill at the Y-12 Plant, Anderson County, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    The US Department of Energy (DOE) is proposing to install a wet ash handling system to dewater bottom ash from the coal-fired steam plant at its Y-12 Plant and to construct a new landfill for disposal of industrial wastes, including the dewatered bottom ash. The DOE operates three major facilities on its Oak Ridge Reservation (ORR). Operation of these facilities results in the production of a variety of nonhazardous, nonradioactive solid wastes (approximately 300 m{sup 3} per day, compacted) including sanitary wastes, common industrial wastes and construction debris. At the current rate of use, this existing landfill will be filled within approximately 18 months, and more space is urgently needed. In an effort to alleviate this problem, DOE and WMD management propose to create additional landfill facilities at a nearby site. The potential environmental impacts associated with this proposed action are the subject of this environmental assessment (EA).

  15. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  16. Bonneville Power Administration 1997 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  17. McKay Bay Facility Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Biomass Facility Facility McKay Bay Facility Sector Biomass Facility Type Municipal Solid Waste Location Hillsborough County, Florida Coordinates 27.9903597, -82.3017728...

  18. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration Overview As of August 11, 2015 Grand Coulee Dam High Voltage Transmission Columbia Generating Station Moody's: Aa1Stable S&P: AA-Stable Fitch: AA...

  19. Audit of Bonneville Power Administration's Management of Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resources, WR-B-96-06 | Department of Energy Bonneville Power Administration's Management of Information Resources, WR-B-96-06 Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06 wr-b-96-06.pdf (77.59 KB) More Documents & Publications Audit Report: WR-B-96-06 Audit Report: IG-0675 Audit Report: ER-B-99-04

  20. The Skycrane at the Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration August 2, 2010 - 10:44am Addthis Daniel B. Poneman Daniel B. Poneman Former Deputy Secretary of Energy What does this project do? The project is now on schedule and under budget. The Skycrane helped overcome challenging environmental conditions. It also made the work safer for workers on the ground. The project is expected to employ approximately 140 people at its peak. For a striking glimpse

  1. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    region's efforts to enhance energy efficiency. Programs like BPA's award-winning Energy Smart Industrial more than doubled the savings industrial facilities achieved compared to...

  2. EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an environmental assessment to analyze the potential effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho.

  3. Forrest County Geothermal Energy Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forrest County Geothermal Energy Project Forrest County Geothermal Energy Project Project objectives: Retrofit two county facilities with high efficiency geothermal equipment (The ...

  4. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  5. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky U.S. Department of Energy Portsmouth/Paducah Project Office December 2015 DOE/EA-1927 ACRONYMS AND ABBREVIATIONS CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act of 1980 CFR Code of Federal Regulations dBA A-weighted decibel DOE U.S. Department of Energy DUF 6 depleted uranium hexafluoride EA

  6. Fulton County, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Stoneacre Energy Solutions LLC Energy Generation Facilities in Fulton County, Ohio Sauder Power Plant Biomass Facility Places in Fulton County, Ohio Archbold, Ohio Delta, Ohio...

  7. Essex County, New Jersey: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Batteries Inc Energy Generation Facilities in Essex County, New Jersey American Ref-Fuel of Essex Biomass Facility Places in Essex County, New Jersey Belleville, New...

  8. Goodhue County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    6 Climate Zone Subtype A. Energy Generation Facilities in Goodhue County, Minnesota Red Wing Biomass Facility Places in Goodhue County, Minnesota Bellechester, Minnesota...

  9. Adams County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Colorado Access Venture Partners Energy Generation Facilities in Adams County, Colorado Metro Wastewater Reclamation District Biomass Facility Places in Adams County, Colorado...

  10. La Crosse County, Wisconsin: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    INOV8 International Inc Energy Generation Facilities in La Crosse County, Wisconsin French Island Biomass Facility Places in La Crosse County, Wisconsin Bangor, Wisconsin Barre,...

  11. Vermilion County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Vermilion County, Illinois Brickyard Energy Partners LLC Biomass Facility Brickyard Recycling Biomass Facility Places in Vermilion County, Illinois Allerton, Illinois Alvan,...

  12. Kenosha County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Zone Subtype A. Energy Generation Facilities in Kenosha County, Wisconsin Pheasant Run Landfill Gas Recovery Biomass Facility Places in Kenosha County, Wisconsin Bristol,...

  13. Pulaski County, Arkansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Stephens, Inc Energy Generation Facilities in Pulaski County, Arkansas Fourche Creek Wastewater Biomass Facility Places in Pulaski County, Arkansas Alexander, Arkansas Cammack...

  14. Macomb County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5 Climate Zone Subtype A. Energy Generation Facilities in Macomb County, Michigan Pine Tree Acres Biomass Facility Places in Macomb County, Michigan Armada, Michigan Center Line,...

  15. Cabarrus County, North Carolina: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Subtype A. Energy Generation Facilities in Cabarrus County, North Carolina Charlotte Motor Speedway Biomass Facility Places in Cabarrus County, North Carolina Concord, North...

  16. Hopewell County, Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    A. Energy Generation Facilities in Hopewell County, Virginia Stone Container Hopewell Mill Biomass Facility Retrieved from "http:en.openei.orgwindex.php?titleHopewellCounty...

  17. Clatsop County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    4 Climate Zone Subtype C. Energy Generation Facilities in Clatsop County, Oregon Wauna Mill Biomass Facility Places in Clatsop County, Oregon Astoria, Oregon Cannon Beach, Oregon...

  18. Florence County, South Carolina: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Generation Facilities in Florence County, South Carolina Stone Container Florence Mill Biomass Facility Places in Florence County, South Carolina Coward, South Carolina...

  19. Monroe County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype A. Energy Generation Facilities in Monroe County, Florida Southernmost Waste To Energy Biomass Facility Places in Monroe County, Florida Big Coppitt Key, Florida Big...

  20. Ramsey County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Agency WindLogics Inc Energy Generation Facilities in Ramsey County, Minnesota St. Paul Biomass Facility Places in Ramsey County, Minnesota Arden Hills, Minnesota Blaine,...

  1. Aqua Caliente County Park Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    Aqua Caliente County Park Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Aqua Caliente County Park Pool & Spa Low Temperature Geothermal Facility...

  2. Plymouth County, Massachusetts: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Zone Subtype A. Registered Energy Companies in Plymouth County, Massachusetts Aeronautica Windpower LLC Energy Generation Facilities in Plymouth County, Massachusetts East...

  3. Workplace Charging Challenge Partner: Ulster County | Department...

    Energy Savers [EERE]

    Ulster County installed plug-in electric vehicle (PEV) charging stations at nine County government facility parking lots (a total of 18 electric vehicle supply equipment EVSE), ...

  4. Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support the Lab's security mission

  5. Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Secure and Sustainable Energy Future Mission/Facilities Facilities Tara Camacho-Lopez 2016-04-06T18:06:13+00:00 National Solar Thermal Test Facility (NSTTF) facility_nsttf_slide NSTTF's primary goal is to provide experimental engineering data for the design, construction, and operation of unique components and systems in proposed solar thermal electrical plants, which have three generic system architectures: line-focus (trough and continuous linear Fresnel reflector systems), point-focus central

  6. Monterey County, California: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    BioJet Corporation Energy Generation Facilities in Monterey County, California Marina Landfill Gas Biomass Facility Monterey Regional Water Cogen Facility Biomass Facility...

  7. EIS-0162: Bonneville Power Administration (BPA) Resource Programs

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration (BPA) developed this programmatic environmental impact statement to support decisions to be made in several future efforts to identify the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers.

  8. EIS-0031: Bonneville Power Administration 1979 Wholesale Rate Increase

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) developed this statement to explain the reasons for BPA's proposed power rate schedule, to conduct an analysis of the impacts which the proposal or alternatives thereto could have on both physical and socioeconomic characteristics of the human environment and to identify methods for mitigating the effects of the proposal.

  9. EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

  10. EIS-0095: Bonneville Power Administration's Expanded Residential Weatherization Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this statement to examine the environmental impacts of an expansion of the existing Residential Weatherization Program to include air-infiltration reducing (tightening) measures, such as storm windows and doors, insulation, weather-stripping and other improvements.

  11. EIS-0093: Bonneville Power Administration's 1982 Rate Proposal

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this statement to evaluate the potential environmental impacts associated with an increase in wholesale power rates for calendar year 1982, including the effects of rate hikes in that year, the cumulative effects of rate hikes from 1979-1985, as well as alternative revenue scenarios.

  12. Randolph Electric Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Biomass Facility Jump to: navigation, search Name Randolph Electric Biomass Facility Facility Randolph Electric Sector Biomass Facility Type Landfill Gas Location Norfolk County,...

  13. San Marcos Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Marcos Biomass Facility Jump to: navigation, search Name San Marcos Biomass Facility Facility San Marcos Sector Biomass Facility Type Landfill Gas Location San Diego County,...

  14. Sunset Farms Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Farms Biomass Facility Jump to: navigation, search Name Sunset Farms Biomass Facility Facility Sunset Farms Sector Biomass Facility Type Landfill Gas Location Travis County, Texas...

  15. Biodyne Lyons Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Lyons Biomass Facility Jump to: navigation, search Name Biodyne Lyons Biomass Facility Facility Biodyne Lyons Sector Biomass Facility Type Landfill Gas Location Cook County,...

  16. Otay Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Otay Biomass Facility Jump to: navigation, search Name Otay Biomass Facility Facility Otay Sector Biomass Facility Type Landfill Gas Location San Diego County, California...

  17. Biodyne Peoria Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Peoria Biomass Facility Jump to: navigation, search Name Biodyne Peoria Biomass Facility Facility Biodyne Peoria Sector Biomass Facility Type Landfill Gas Location Peoria County,...

  18. Mono County update

    SciTech Connect (OSTI)

    Lyster, D. )

    1988-12-01

    The Mono County Board of Supervisors approved the issuance of a use-permit for the Mammoth-Pacific II geothermal power plant. The power plant will be a binary, air-cooled, 10-megawatt, net, project. An appeal was filed by the California Department of Fish and Game, and the permit will not take effect until this appeal is resolved. Mono County also issued a project use-permit to proposers of Bonneville Pacific Corporations Mammoth Chance Geothermal Project, also a 10-megawatt, net, binary and air-cooled project. The permit was appealed by the Sierra Club, Cal-Trout, and the California Department of Fish and Game. Now, a subsequent EIR must be prepared for public review and comment. The subsequent EIR will address the issue of cumulative impacts and will include a discussion of new information.

  19. Harris County- Green Building Policy for County Buildings

    Broader source: Energy.gov [DOE]

    The Harris County Facilities and Property Management (FPM) Division also requires all county buildings to meet minimum energy efficiency and sustainability measures, as described in the Best Gree...

  20. Bonneville Power Administration 1991 site environmental report

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  1. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  2. HYTEST Phase I Facility Commissioning and Modeling

    SciTech Connect (OSTI)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  3. Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities The the WTGa1 turbine (aka DOE/SNL #1) retuns to power as part of a final series of commissioning tests. Permalink Gallery First Power for SWiFT Turbine Achieved during Recommissioning Facilities, News, Renewable Energy, SWIFT, Wind Energy, Wind News First Power for SWiFT Turbine Achieved during Recommissioning The Department of Energy's Scaled Wind Farm Technology (SWiFT) Facility reached an exciting milestone with the return to power production of the WTGa1 turbine (aka DOE/SNL #1)

  4. EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700-foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line, originally filed as FES 75-79.

  5. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  6. EIS-0183: Shepherds Flat Wind Project in Gilliam and Morrow counties, OR |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 183: Shepherds Flat Wind Project in Gilliam and Morrow counties, OR EIS-0183: Shepherds Flat Wind Project in Gilliam and Morrow counties, OR Documents Available for Download October 19, 2010 EIS-0183: Revised Record of Decision Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration

  7. EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

  8. Norfolk County, Massachusetts: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Randolph Electric Biomass Facility Places in Norfolk County, Massachusetts Avon, Massachusetts Bellingham, Massachusetts Braintree, Massachusetts Canton, Massachusetts...

  9. EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration Proposed FY 1976 Program Facility Location, Okanogan Area Service, Douglas and Okanogan Counties, WA, Supplemental

  10. New London County, Connecticut: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Electric Co Inc Energy Generation Facilities in New London County, Connecticut American Ref-Fuel of SE CT Biomass Facility Wheelabrator Lisbon Biomass Facility Utility Companies...

  11. Tuolumne County, California: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    MRL Industries Inc Energy Generation Facilities in Tuolumne County, California SPI Sonora Biomass Facility Ultrapower Chinese Station Biomass Facility Places in Tuolumne...

  12. Klamath County Shops Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Shops Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Klamath County Shops Space Heating Low Temperature Geothermal Facility Facility Klamath...

  13. Klamath County Jail Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Jail Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Klamath County Jail Space Heating Low Temperature Geothermal Facility Facility Klamath...

  14. Cook County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Corporation Gaebler Ventures LLC Energy Generation Facilities in Cook County, Illinois Avon Energy Partners LLC Biomass Facility Biodyne Congress Biomass Facility Biodyne Lyons...

  15. Pierce County, Washington: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Panel Association (SIPA) Energy Generation Facilities in Pierce County, Washington P.E.R.C. Biomass Facility Simpson Tacoma Biomass Facility Tacoma Landfill Gas Utilization...

  16. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  17. EA-1605: Biomass Cogeneration and Heating Facilities at the Savannah River Site; Aiken, Allendale and Barnwell Counties, South Carolina

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts of the proposed construction and operation of new biomass cogeneration and heating facilities at the Savannah River Site (SRS).

  18. EA-1106: Explosive Waste Treatment Facility at Site 300, Lawrence Livermore National Laboratory, San Joaquin County, California

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to build, permit, and operate the Explosive Waste Treatment Facility to treat explosive waste at the U.S. Department of Energy's Lawrence...

  19. EIS-0125: Bonneville Power Administration Intertie Development and Use

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long-term Intertie Access Policy, and enabling firm power marketing between California and the Northwest in order to make possible additional short- and long-term sales of the Federal power surplus. The Western Area Power Administration cooperated in the preparation of this EIS by virtue of its special expertise concerning the Third Alternating Current/California-Oregon Transmission Project.

  20. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    team limit. The Bonneville Power Administration provides free programs, presentations and information to K-12 schools in the Pacific Northwest to help students achieve energy...

  1. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, Dec. 3, 2014 CONTACT: Doug Johnson, 503-230-5840503-230-5131 Richard Shaheen named senior vice president BPA...

  2. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, Sept. 24, 2014 CONTACT: Kevin Wingert, 503-230-4140503-230-5131 Nancy Mitman named BPA's chief financial...

  3. EA-1002: Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot...

  4. EA-0513: Approaches for Acquiring Energy Savings in Commercial Sector Buildings, Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to use several diverse approaches to purchase or acquire energy savings from commercial sector...

  5. EL11-44 Compliance Filing of the Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tariff and into existing and new Large Generator Interconnection Agreements and to be effective as of March 31, 2012, through March 30, 2013. On February 7, 2012, Bonneville...

  6. Berlin Gorham Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Gorham Biomass Facility Jump to: navigation, search Name Berlin Gorham Biomass Facility Facility Berlin Gorham Sector Biomass Location Coos County, New Hampshire Coordinates...

  7. Mecca Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Plant Biomass Facility Jump to: navigation, search Name Mecca Plant Biomass Facility Facility Mecca Plant Sector Biomass Location Riverside County, California Coordinates...

  8. Steam plant ash disposal facility and industrial landfill at the Y-12 Plant, Anderson County, Tennessee. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    The US Department of Energy (DOE) is proposing to install a wet ash handling system to dewater bottom ash from the coal-fired steam plant at its Y-12 Plant and to construct a new landfill for disposal of industrial wastes, including the dewatered bottom ash. The DOE operates three major facilities on its Oak Ridge Reservation (ORR). Operation of these facilities results in the production of a variety of nonhazardous, nonradioactive solid wastes (approximately 300 m{sup 3} per day, compacted) including sanitary wastes, common industrial wastes and construction debris. At the current rate of use, this existing landfill will be filled within approximately 18 months, and more space is urgently needed. In an effort to alleviate this problem, DOE and WMD management propose to create additional landfill facilities at a nearby site. The potential environmental impacts associated with this proposed action are the subject of this environmental assessment (EA).

  9. Martin County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Energy Companies in Martin County, Florida SEPCO - Solar Electric Power Company Sol Inc Energy Generation Facilities in Martin County, Florida Martin Next Generation Solar...

  10. Elko County School District District Heating Low Temperature...

    Open Energy Info (EERE)

    Elko County School District District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Elko County School District District Heating Low Temperature...

  11. Hunterdon County, New Jersey: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    County, New Jersey Advanced Solar Products DEK International MAK Technologies Quest Environmental Engineering Services Inc Energy Generation Facilities in Hunterdon County,...

  12. Atlantic County, New Jersey: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Companies in Atlantic County, New Jersey Bartholomew Heating and Cooling Energy Enterprises South Jersey Industries Energy Generation Facilities in Atlantic County, New Jersey...

  13. Davidson County, Tennessee: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in Davidson County, Tennessee Agri Energy Inc Nashville Electric Service NES Universal Lighting Technologies Energy Generation Facilities in Davidson County, Tennessee MM...

  14. New Hanover County, North Carolina: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    A. Registered Energy Companies in New Hanover County, North Carolina Chemtex GE Hitachi Nuclear Energy Energy Generation Facilities in New Hanover County, North Carolina New...

  15. Sherburne County, Minnesota: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    County, Minnesota Elk River Biomass Facility Places in Sherburne County, Minnesota Becker, Minnesota Big Lake, Minnesota Clear Lake, Minnesota Elk River, Minnesota Princeton,...

  16. Yavapai County, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    EV Solar Products Energy Generation Facilities in Yavapai County, Arizona Prescott Airport Solar Plant Solar Power Plant Places in Yavapai County, Arizona Ash Fork, Arizona...

  17. Butte County, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Companies in Butte County, California FAFCO Inc Sierra Nevada Brewing Company Springboard Biodiesel LLC Energy Generation Facilities in Butte County, California Oroville Biomass...

  18. St. Clair County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in St. Clair County, Illinois DarkStar VI Mid America Advanced Power Solutions Midwest Biodiesel Products Energy Generation Facilities in St. Clair County, Illinois Milam Gas...

  19. Ashland County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Zone Subtype A. Registered Energy Companies in Ashland County, Wisconsin Point Bio Energy LLC Energy Generation Facilities in Ashland County, Wisconsin Bay Front Biomass...

  20. Peoria County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Illinois Aventine Renewable Energy Holdings Aventine Renewable Energy Inc Firefly Energy Inc Energy Generation Facilities in Peoria County, Illinois Biodyne Peoria...

  1. Marion County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Number 4 Climate Zone Subtype C. Registered Energy Companies in Marion County, Oregon Diesel Brewing Energy Generation Facilities in Marion County, Oregon Covanta Marion Inc....

  2. Lake County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    2 Climate Zone Subtype A. US Recovery Act Smart Grid Projects in Lake County, Florida City of Leesburg, Florida Smart Grid Project Energy Generation Facilities in Lake County,...

  3. Macon County, Illinois: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5 Climate Zone Subtype A. Registered Energy Companies in Macon County, Illinois Archer Daniels Midland Tate & Lyle Energy Generation Facilities in Macon County, Illinois KMS Macon...

  4. Chambers County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Texas Reliant Baytown Biomass Facility Places in Chambers County, Texas Anahuac, Texas Baytown, Texas Beach City, Texas Cove, Texas Mont Belvieu, Texas Old...

  5. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  6. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  7. Mono County update

    SciTech Connect (OSTI)

    Lyster, D.L.

    1987-06-01

    On February 9, 1988, the Mono County Board of Supervisors voted to approve Bonneville Pacific Corporation's Mammoth Chance Geothermal Project. The project is an air-cooled, binary, geothermal power plant, 10 megawatts, net. The Mono County Board of Supervisors issued a project use-permit with vigorous and stringent conditions. Specific emphasis was placed on the establishment of a monitoring program designed to detect the effects of geothermal development on the springs at the Hot Creek Fish Hatchery and Hot Creek Gorge. On October 5, 1987, the Mono County Planning Commission granted a use-permit to Mammoth Pacific for its Mammoth Pacific II Project, a binary, air-cooled, geothermal power plant, 10 megawatts, net. The issuance of the use-permit instigated an appeal by the Sierra Club. That appeal was heard on February 22, 1988, At the end of the testimony, the Board of Supervisors voted to uphold the appeal of the Sierra Club, thereby denying the project by a vote of 3 to 2. The main areas of concern voiced by the majority of the Board included potential hydrologic impacts to Hot Creek Gorge and Hot Creek Fish Hatchery, visual impacts, and impacts to mule deer migration and survival. One of the options now available to Mammoth Pacific is to request that the project be denied without prejudice. This would allow Mammoth Pacific to return to the Board immediately with additional material regarding its concerns.

  8. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  9. Audit of Bonneville Power Administration`s management of Information Resources

    SciTech Connect (OSTI)

    1996-04-02

    Bonneville Power Administration`s (Bonneville) information resources include computer-related equipment, spare parts, and computer software. The objective of this audit was to determine whether Bonneville acquired and accounted for computer-related equipment properly. We found positive aspects in Bonneville`s management of computer-related equipment. However, improvements could be made in implementing credit card and property procedures. Specifically, we found that improvements were needed to (1) control credit card purchases, (2) ensure that equipment was tagged and included in property records, (3) maintain accountability over spare parts, and (4) identify unused equipment. As a result, about $90,000 of equipment was bought by personnel whose authority to purchase was not properly documented, and about $182,000 of purchases lacked supporting invoices. In addition, one maintenance support group had over $109,000 of spare parts shortages. Furthermore, Bonneville could have saved about $803,000 had unused equipment been redistributed within Bonneville or to other Federal and state agencies. Management concurred with the recommendations to improve internal controls.

  10. Forest County Potawatomi Community- 2014 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Forest County Potawatomi Community (FCPC), in collaboration with a selected contractor, will install and operate approximately 875 kilowatts (kW) of solar photovoltaic (PV) systems at a minimum of eight tribal facilities in Milwaukee and Forest Counties.

  11. Miami-Dade County- Sustainable Buildings Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2005, the Miami-Dade Board of County Commissioners passed a resolution to incorporate sustainable building measures into county facilities. In 2007, Ordinance 07-65 created the Sustainable...

  12. Facility Floorplan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facility floorplan Facility Floorplan

  13. Intensive archaeological survey of the proposed Central Sanitary Wastewater Treatment Facility, Savannah River Site, Aiken and Barnwell Counties, South Carolina

    SciTech Connect (OSTI)

    Stephenson, D.K.; Sassaman, K.E.

    1993-11-01

    The project area for the proposed Central Sanitary Wastewater Treatment Facility on the Savannah River Site includes a six-acre tract along Fourmile Branch and 18 mi of trunk line corridors. Archaeological investigations of the six-acre parcel resulted in the discovery of one small prehistoric site designated 38AK465. This cultural resource does not have the potential to add significantly to archaeological knowledge of human occupation in the region. The Savannah River Archaeological Research Program (SRARP) therefore recommends that 38AK465 is not eligible for nomination to the National Register of Historic Places (NRHP) and further recommends a determination of no effect. Archaeological survey along the trunk line corridors implicated previously recorded sites 38AK92, 38AK145, 38AK415, 38AK417, 38AK419, and 38AK436. Past disturbance from construction had severely disturbed 38AK92 and no archaeological evidence of 38AK145, 38AK419, and 38AK436 was recovered during survey. Lacking further evidence for the existence of these sites, the SRARP recommends that 38AK92, 38AK145, 38AK419, and 38AK436 are not eligible for nomination to the NRHP and thus warrant a determination of no effect. Two of these sites, 38Ak415 and 38AK417, required further investigation to evaluate their archaeological significance. Both of the sites have the potential to yield significant data on the prehistoric period occupation of the Aiken Plateau and the SRARP recommends that they are eligible for nomination to the NRHP. The Savannah River Archaeological Research Program recommends that adverse effects to sites 38AK415 and 38AK417 from proposed construction can be mitigated through avoidance.

  14. Livingston County, Illinois: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Illinois Biodyne Pontiac Biomass Facility Places in Livingston County, Illinois Campus, Illinois Chatsworth, Illinois Cornell, Illinois Cullom, Illinois Dwight, Illinois...

  15. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  16. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    SciTech Connect (OSTI)

    Englin, J E; Gygi, K F

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs.

  17. With the onset of fall and the return of school, the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tuesday, Nov. 26, 2013 CITY OF SALEM Nicole Miller, 503-540-2415 OREGON DEPARTMENT OF FISH & WILDLIFE Meg Kenagy, 503-947-6021 BONNEVILLE POWER ADMINISTRATION Kevin Wingert,...

  18. Portsmouth County, Virginia: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    A. Energy Generation Facilities in Portsmouth County, Virginia SPSA Waste To Energy Power Plant Biomass Facility Retrieved from "http:en.openei.orgwindex.php?titlePortsm...

  19. Beaver County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Facility Blundell 2 Geothermal Facility Places in Beaver County, Utah Beaver, Utah Milford, Utah Minersville, Utah Retrieved from "http:en.openei.orgwindex.php?titleBeaver...

  20. Dakota County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Landfill Biomass Facility Pine Bend Biomass Facility Places in Dakota County, Minnesota Apple Valley, Minnesota Burnsville, Minnesota Coates, Minnesota Eagan, Minnesota Farmington,...

  1. Franklin County, Maine: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Biomass Facility Forster Strong Mill Biomass Facility Places in Franklin County, Maine Avon, Maine Carrabassett Valley, Maine Carthage, Maine Chesterville, Maine Chisholm, Maine...

  2. Amelia County, Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    4 Climate Zone Subtype A. Energy Generation Facilities in Amelia County, Virginia Scott Wood Biomass Facility Retrieved from "http:en.openei.orgwindex.php?titleAmeliaCo...

  3. Review of Allegations Regarding Continued Retaliation Against a Bonneville Power Administration Whistleblower

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INQUIRY REPORT Review of Allegations Regarding Continued Retaliation Against a Bonneville Power Administration Whistleblower DOE/IG-0910 May 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 May 15, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Inquiry: "Review of Allegations Regarding Continued Retaliation Against a Bonneville Power

  4. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  5. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  6. Sauder Power Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Sauder Power Plant Biomass Facility Jump to: navigation, search Name Sauder Power Plant Biomass Facility Facility Sauder Power Plant Sector Biomass Location Fulton County, Ohio...

  7. Boralex Fort Fairfield Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Fort Fairfield Biomass Facility Jump to: navigation, search Name Boralex Fort Fairfield Biomass Facility Facility Boralex Fort Fairfield Sector Biomass Location Aroostook County,...

  8. S D Warren Somerset Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    D Warren Somerset Biomass Facility Jump to: navigation, search Name S D Warren Somerset Biomass Facility Facility S D Warren Somerset Sector Biomass Location Cumberland County,...

  9. Boralex Stratton Energy Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Stratton Energy Biomass Facility Jump to: navigation, search Name Boralex Stratton Energy Biomass Facility Facility Boralex Stratton Energy Sector Biomass Location Franklin County,...

  10. Lyonsdale Biomass LLC Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    LLC Biomass Facility Jump to: navigation, search Name Lyonsdale Biomass LLC Biomass Facility Facility Lyonsdale Biomass LLC Sector Biomass Location Lewis County, New York...

  11. Biomass One LP Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    LP Biomass Facility Jump to: navigation, search Name Biomass One LP Biomass Facility Facility Biomass One LP Sector Biomass Location Jackson County, Oregon Coordinates 42.334535,...

  12. Altamont Gas Recovery Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    search Name Altamont Gas Recovery Biomass Facility Facility Altamont Gas Recovery Sector Biomass Facility Type Landfill Gas Location Alameda County, California Coordinates...

  13. M L Hibbard Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    L Hibbard Biomass Facility Jump to: navigation, search Name M L Hibbard Biomass Facility Facility M L Hibbard Sector Biomass Location St. Louis County, Minnesota Coordinates...

  14. Wheelabrator North Andover Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Facility Wheelabrator North Andover Sector Biomass Facility Type Municipal Solid Waste Location Essex County, Massachusetts Coordinates 42.7051144, -70.9071236...

  15. SEMASS Resource Recovery Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Facility SEMASS Resource Recovery Sector Biomass Facility Type Municipal Solid Waste Location Plymouth County, Massachusetts Coordinates 41.9120406, -70.7168469...

  16. Wheelabrator South Broward Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Facility Wheelabrator South Broward Sector Biomass Facility Type Municipal Solid Waste Location Broward County, Florida Coordinates 26.190096, -80.365865 Show Map...

  17. Woodlake Sanitary Services Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    search Name Woodlake Sanitary Services Biomass Facility Facility Woodlake Sanitary Services Sector Biomass Facility Type Landfill Gas Location Hennepin County, Minnesota...

  18. Penrose Power Station Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Penrose Power Station Biomass Facility Facility Penrose Power Station Sector Biomass Facility Type Landfill Gas Location Los Angeles County,...

  19. Ridgewood Providence Power Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    search Name Ridgewood Providence Power Biomass Facility Facility Ridgewood Providence Power Sector Biomass Facility Type Landfill Gas Location Providence County, Rhode Island...

  20. Toyon Power Station Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Toyon Power Station Biomass Facility Facility Toyon Power Station Sector Biomass Facility Type Landfill Gas Location Los Angeles County,...

  1. KMS Joliet Power Partners LP Biomass Facility | Open Energy Informatio...

    Open Energy Info (EERE)

    navigation, search Name KMS Joliet Power Partners LP Biomass Facility Facility KMS Joliet Power Partners LP Sector Biomass Facility Type Landfill Gas Location Will County, Illinois...

  2. Marsh Road Power Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name Marsh Road Power Plant Biomass Facility Facility Marsh Road Power Plant Sector Biomass Facility Type Landfill Gas Location San Mateo County,...

  3. Newby Island II Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Facility Facility Newby Island II Sector Biomass Facility Type Landfill Gas Location Santa Clara County, California Coordinates 37.2938907, -121.7195459 Show Map Loading...

  4. Bridgewater Power LP Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Power LP Biomass Facility Jump to: navigation, search Name Bridgewater Power LP Biomass Facility Facility Bridgewater Power LP Sector Biomass Location Grafton County, New Hampshire...

  5. Chesterfield County, Virginia: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Facility Places in Chesterfield County, Virginia Bellwood, Virginia Bensley, Virginia Bon Air, Virginia Chester, Virginia Chesterfield Court House, Virginia Ettrick, Virginia...

  6. Solano County Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Wind Facility Status In Service Developer Kenetech Windpower Energy Purchaser Pacific Gas & Electric Co Location Solano County CA Coordinates 38.1535, -121.858 Show Map...

  7. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

  8. EA-1974: Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed restoration of a tidal marsh in the Columbia River Estuary, near Astoria in Clatsop County, Oregon. The project website is https://www.bpa.gov/goto/WallooskeeYoungs.

  9. EA-1980: Spar Canyon-Round Valley Access Road System Improvements, Custer County, Idaho

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of proposed improvements to the access road system for its existing Spar Canyon-Round Valley Transmission Line located on Bureau of Land Management land in Custer County, Idaho.

  10. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) prepared an EA to assess the potential environmental impacts of the Northern Mid-Columbia Joint Project, a 230-kilvolt transmission line proposed by BPA and the Public Utility Districts of Grant, Chelan, and Douglas Counties, Washington.

  11. EA-1996: Glass Buttes Radio Station, Lake County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management (BLM), with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, is preparing an EA that will evaluate the potential environmental impacts of a proposal to construct two telecommunications facilities, one of which would provide BPA telecommunications services, on BLM land. Additional information is available at http://www.blm.gov/or/districts/prineville/plans/glassbuttes/.

  12. NEPA strategy for the Bonneville Power Administration energy resource acquisition

    SciTech Connect (OSTI)

    Pierce, K.S.; Alton, C.C.; Linehan, A.O.

    1995-12-01

    The Bonneville Power Administration (BPA) has a statutory obligation to supply cost-effective electric power to its customers. BPA must also be consistent with the Pacific Northwest Electric Power Planning and Conservation Act, which requires consideration of the Northwest Power Planning Council`s Conservation and Electric Power Plan and Fish and Wildlife Program. The challenge is to operate effectively within an increasingly competitive and dynamic electric utility market while continuing its commitment to the National Environmental Policy Act (NEPA). BPA developed a tiered approach to its environmental analyses associated with energy resource planning and acquisition. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic document designed to support energy resource decisions for several years. The RPEIS includes a description of the environmental impacts and potential mitigation measures for various energy resources-including conservation, efficiency improvements, renewable resources, cogeneration, combustion turbines, nuclear, and coal. Information was also provided on fuel switching, load management, and emerging technologies. After analyzing the environmental trade-offs among resources, the RPEIS focuses on the cumulative effects of adding these resources to the existing power system. The Record of Decision documents that BPA`s resource acquisitions will include all cost-effective conservation and efficiency improvements, supplemented by a mix of renewables and thermal resources. Subsequent site-specific documents have been prepared on individual resource acquisitions. By focusing environmental reviews on the actual issues ripe for decision and by providing timely environmental information to the public and to the decisionmakers, this tiered approach led to better decisionmaking. BPA was able to operate in a more business-like manner while assuring NEPA compliance.

  13. EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection with LVE's existing transmission system in northeastern Caribou County. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

  14. Bonneville Power Administration and the Industrial Technologies Program Leverage Support to Overcome Energy Efficiency Barriers in the Northwest

    Broader source: Energy.gov [DOE]

    This case study explores how Bonneville Power Administration, a Northwest regional wholesale power provider, rethought how to encourage and promote energy efficiency projects through its utilities.

  15. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  16. NEPA audits at the Bonneville Power Administration`s office of energy resources

    SciTech Connect (OSTI)

    Beachler, M.C.; Patton, J.E.; Alton, C.C.

    1993-05-01

    Since 1984, the Bonneville Power Administration (Bonneville) has evaluated the environmental performance of its energy resource acquisition programs. To date, these programs have mostly comprised conservation activities in residential and commercial buildings. In the environmental documentation for these programs under the National Environmental Policy Act of 1969 (NEPA), the agency has established a set of mitigation measures that ensure against adverse environmental impacts. The agency uses environmental audits to evaluate the programs` performance in meeting the NEPA promises, and how well NEPA documents meet the programs needs and how effectively environmental and program staff interact. Since 1984 the Pacific Northwest Laboratory (PNL) has conducted 22 of the audits for Bonneville. The audits are inexpensive and unobstrusive; thus they can be repeated as needed and can be used as a tool to facilitate communication rather than simply to meet administrative rules. As Bonneville moves into an aggressive energy resource acquisition mode, these audits will serve as a model for the ongoing evaluation of environmental performance and may be adopted agency-wide to address regulations beyond NEPA.

  17. A Michigan County Unearths Savings with Geothermal Energy | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addthis Kent County Correctional Facility is saving energy and money with a new ... The new heating and cooling system is expected to save the county an average 100,000 ...

  18. Fewer lights, Brighter Shine in New Hampshire County

    Office of Energy Efficiency and Renewable Energy (EERE)

    The parking lot to the county courthouse and nursing home facility in Strafford County, New Hampshire needed new lights. And thanks to an Energy Efficiency and Conservation Block Grant from the Energy Department, Strafford got what it needed and more.

  19. Canastota Renewable Energy Facility Project

    SciTech Connect (OSTI)

    Blake, Jillian; Hunt, Allen

    2013-12-13

    The project was implemented at the Madison County Landfill located in the Town of Lincoln, Madison County, New York. Madison County has owned and operated the solid waste and recycling facilities at the Buyea Road site since 1974. At the onset of the project, the County owned and operated facilities there to include three separate landfills, a residential solid waste disposal and recycled material drop-off facility, a recycling facility and associated administrative, support and environmental control facilities. This putrescible waste undergoes anaerobic decomposition within the waste mass and generates landfill gas, which is approximately 50% methane. In order to recover this gas, the landfill was equipped with gas collection systems on both the east and west sides of Buyea Road which bring the gas to a central point for destruction. In order to derive a beneficial use from the collected landfill gases, the County decided to issue a Request for Proposals (RFP) for the future use of the generated gas.

  20. Oncor Electric Delivery- Government and Education Facilities Program

    Broader source: Energy.gov [DOE]

    The Government Facilities Program was developed to provide viable energy efficiency and demand reduction solutions for city and county owned and operated facilities. As part of the Government...

  1. Pioneer Valley Resource Recovery Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Facility Pioneer Valley Resource Recovery Sector Biomass Facility Type Municipal Solid Waste Location Hampden County, Massachusetts Coordinates 42.1172314, -72.6624209...

  2. Bubbles Hot Spring Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Spa Low Temperature Geothermal Facility Facility Bubbles Hot Spring Sector Geothermal energy Type Pool and Spa Location Catron County, New Mexico Coordinates 34.1515173,...

  3. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities ...

  4. County, LANL consider colocation space

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    County, LANL consider colocation space County, LANL consider colocation space The space will be geared toward a wide range of users: entrepreneurs, freelances, young professionals, small business, visiting corporate employees, LANL staff, LANL strategic partners and youth. April 24, 2016 Y project logo The 2,400-square-foot facility at 150 Central Park Square will include a large open collaborative space, a private meeting room available for rent, a kitchen and "phone booths" for

  5. Plant No 2 Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    No 2 Biomass Facility Jump to: navigation, search Name Plant No 2 Biomass Facility Facility Plant No 2 Sector Biomass Facility Type Non-Fossil Waste Location Orange County,...

  6. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  7. 2014 Community- and Facility-Scale Workshop Agenda and Presentations

    Broader source: Energy.gov [DOE]

    Download the agenda and available presentations from guest speakers at the Office of Indian Energy's Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance workshop held July 10-11, 2014, at the Bonneville Power Administration in Portland, Oregon.

  8. Lenawee County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5 Climate Zone Subtype A. Registered Energy Companies in Lenawee County, Michigan Biofuel Industries Group LLC Tecumseh Products Company Energy Generation Facilities in...

  9. Alachua County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Park Industries Inc formerly Moltech Power Systems Inc G.W. Robinson Homes Tommy Williams Energy Generation Facilities in Alachua County, Florida South West Landfill Biomass...

  10. Amador County, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Facility Places in Amador County, California Amador City, California Ione, California Jackson, California Plymouth, California Sutter Creek, California Retrieved from "http:...

  11. Cowlitz County PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Cowlitz County PUD offers the Commercial Energy Efficiency Program (CEEP) for non-residential customers to improve the efficiency of facilities. The program offers incentives on lighting, custom...

  12. Bucks County, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Pennsylvania DrexelSolar Fibrominn LLC Fibrowatt LLC Homeland Renewable Energy LLC New Hope Partners LLC Power Energy Inc Energy Generation Facilities in Bucks County,...

  13. Renewable Energy Deployment Projects for Forest County Potawatomi...

    Energy Savers [EERE]

    County Potawatomi Community (FCPC) has significantly reduced greenhouse gas emissions through the deployment of a biogas generation facility and solar photovoltaic (PV) system. ...

  14. Lane County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Biomass Facility Places in Lane County, Oregon Coburg, Oregon Cottage Grove, Oregon Creswell, Oregon Dunes City, Oregon Eugene, Oregon Florence, Oregon Junction City, Oregon...

  15. Monroe County, Alabama: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Alabama Pine Pulp Biomass Facility Places in Monroe County, Alabama Beatrice, Alabama Excel, Alabama Frisco City, Alabama Monroeville, Alabama Vredenburgh, Alabama Retrieved from...

  16. Providence County, Rhode Island: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Companies in Providence County, Rhode Island American Battery Charging Inc Cookson Electronics Evans Capacitor Company Tomorrow BioFuels LLC Energy Generation Facilities in...

  17. Hendricks County, Indiana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Bridges Gas Recovery Biomass Facility Places in Hendricks County, Indiana Amo, Indiana Avon, Indiana Brownsburg, Indiana Clayton, Indiana Coatesville, Indiana Danville, Indiana...

  18. Gwinnett County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    BJ Gas Recovery Biomass Facility Places in Gwinnett County, Georgia Auburn, Georgia Berkeley Lake, Georgia Braselton, Georgia Buford, Georgia Dacula, Georgia Duluth, Georgia...

  19. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  20. NEPA audits at the Bonneville Power Administration's office of energy sources

    SciTech Connect (OSTI)

    Baechler, M. )

    1993-01-01

    Since 1984, the Bonneville Power Administration has evaluated the environmental performance of its energy resource acquisition programs. To date, these programs have mostly comprised conservation activities in residential and commercial buildings. In its NEPA documentation for these programs, the agency has established a set of mitigation measures that ensure against adverse environmental impacts. The agency uses the environmental audits to evaluate the programs' performance in meeting the NEPA promises, as well as addressing how well NEPA documents meet the programs' needs and how effectively environmental and program staff interact. The audits are inexpensive and unobtrusive, thus they can be repeated as needed and can be used as a tool to facilitate communication rather than simply to meet administrative rules. As Bonneville moves to an aggressive energy resource acquisition mode, these audits will serve as a model for the ongoing evaluation of environmental performance and may be adopted agency-wide to address regulations beyond NEPA.

  1. Health assessment for Fletcher's Paint Works and Storage Facility Hazardous Waste Material, Milford, Hillsborough County, New Hampshire, Region 1. CERCLIS No. NHD981067614. Preliminary report

    SciTech Connect (OSTI)

    Not Available

    1990-06-11

    Fletcher's Paint Works and Storage Facility Hazardous Waste Site (Fletcher's Paint Site) in Milford, New Hampshire, consists of three distinct entities: Fletcher's Paint Works at 21 Elm Street, Fletcher's Paint Storage Facility on Mill Street, and a drainage ditch leading from the storage facility property to Hampshire Paper Company property. The aggregation of these three properties was based on the similar nature of operations and wastes, the close proximity of the areas, the same target population, and the same underlying aquifer at risk of contamination. The aggregated site has contributed to the contamination of soil, groundwater, surface water, sediment, and air with various volatile organic chemicals (VOCs), semivolatile organic chemicals (SVOCs), heavy metals, and polychlorinated biphenyls (PCBs). Environmental monitoring related to the Fletcher's Paint Site has consisted of sampling of the Keyes Well by the NH WSPCC, and sampling at the paint works, storage facility and drainage ditch by NUS Corporation and EPA's Environmental Services Division (ESD). Contaminant levels at each location is discussed individually. Based upon the available information, the Fletcher's Paint NPL Site is considered to be of potential public health concern because of the risk to public health caused by potential exposure to hazardous substances, such as VOCs, PCBs, PAHs, and heavy metals, at concentrations that may result in adverse health effects. Exposure to contaminated soil and surface water, and potentially contaminated fish may be occurring. The site is located in a densely populated part of town, while the storage facility is readily accessible to children walking to and from school.

  2. EA-1996: Glass Butte Radio Station, Lake County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management (BLM), with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, is preparing an EA that will evaluate the potential environmental impacts of a proposal to construct two telecommunications facilities, one of which would provide BPA telecommunications services, on BLM land. Additional information is available at https://www.bpa.gov/efw/Analysis/NEPADocuments/Pages/Glass-Butte.aspx.

  3. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  4. Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF BONNEVILLE POWER ADMINISTRATION'S MANAGEMENT OF INFORMATION RESOURCES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

  5. Idaho National Engineering and Environmental Laboratory, Old Waste Calcining Facility, Scoville vicinity, Butte County, Idaho -- Photographs, written historical and descriptive data. Historical American engineering record

    SciTech Connect (OSTI)

    1997-12-31

    This report describes the history of the Old Waste Calcining Facility. It begins with introductory material on the Idaho National Engineering and Environmental Laboratory, the Materials Testing Reactor fuel cycle, and the Idaho Chemical Processing Plant. The report then describes management of the wastes from the processing plant in the following chapters: Converting liquid to solid wastes; Fluidized bed waste calcining process and the Waste Calcining Facility; Waste calcining campaigns; WCF gets a new source of heat; New Waste Calcining Facility; Last campaign; Deactivation and the RCRA cap; Significance/context of the old WCF. Appendices contain a photo key map for HAER photos, a vicinity map and neighborhood of the WCF, detailed description of the calcining process, and chronology of WCF campaigns.

  6. EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment DOE will prepare an EA to evaluate the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington.

  7. Local Option- Industrial Facilities and Development Bonds

    Broader source: Energy.gov [DOE]

    Under the Utah Industrial Facilities and Development Act, counties, municipalities, and state universities in Utah may issue Industrial Revenue Bonds (IRBs) or Industrial Development Bonds (IDBs)...

  8. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  9. Forest County Potawatomi Community- 2010 Project

    Broader source: Energy.gov [DOE]

    The Forest County Potawatomi Community ("FCPC" or "Tribe") owns a six-story parking facility that consists of two separate buildings located on fee land adjacent to its Milwaukee Bingo Casino operation.

  10. Durham County- High-Performance Building Policy

    Office of Energy Efficiency and Renewable Energy (EERE)

    Durham County adopted a resolution in October 2008 that requires new non-school public buildings and facilities to meet high-performance standards. New construction of public buildings and...

  11. Dutchess County Resource Recovery Task Force report: Dutchess County Pyrolysis Program

    SciTech Connect (OSTI)

    None

    1980-07-01

    Dutchess County initiated development of a long-range master plan for Solid Waste Management in 1971. The plan included development of a resource recovery facility to service the municipalities in the County population center. Based on early recommendations, a pyrolysis facility employing Purox technology was to be implemented. A feasibility study, paid for by County funds was completed in 1975. The study provided siting recommendations, estimation of available waste, and preliminary facility design. Because of various considerations, the project was not developed. Under the Department of Energy grant, the County reassessed the feasibility of a resource recovery facility, with emphasis on confirming previous conclusions supporting the Purox technology, waste availability, energy recovery and sale and siting of the plant. The conclusions reached in the new study were: a resource recovery facility is feasible for the County; sufficient waste for such a facility is available and subject to control; While Purox technology was feasible it is not the most appropriate available technoloy for the County; that mass burning with steam recovery is the most appropriate technology; and that resource recovery while presently more expensive than landfilling, represents the only cost effective, energy efficient, and environmentally sound way to handle the solid waste problem in the County.

  12. EIS-0070: Mining, Construction and Operation for a Full-size Module at the Anvil Points Oil Shale Facility, Rifle, Garfield County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy prepared this environmental impact statement to assess the environmental and socioeconomic implications of its proposal to mine 11 million tons of oil shale from the Naval Oil Shale Reserves (NOSR) at Anvil Points, Colorado; to construct an experimental full-size shale retort module on a 365-acre lease tract having a 4700 bbl/day production capacity; and to consider extension, modification or new leasing of the facility. This project was cancelled after the DEIS was issued.

  13. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  14. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  15. Forest County Potawatomi Community: Energy Efficiency and Renewable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community: Energy Efficiency and Renewable Energy Projects Mercedes Vega Forest County Potawatomi Community Milwaukee, Wisconsin 2 Background on Forest County Potawatomi Community Ø FCPC has trust land in northern Wisconsin and the City of Milwaukee. Ø Facilities include tribal government offices, a health and wellness center, a cultural museum, a former college campus, a hotel, two casinos and various other smaller support facilities and enterprises. 3 Forest County Potawatomi Community

  16. J C McNeil Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    C McNeil Biomass Facility Jump to: navigation, search Name J C McNeil Biomass Facility Facility J C McNeil Sector Biomass Location Chittenden County, Vermont Coordinates...

  17. Summary and evaluation of existing geological and geophysical data near prospective surface facilities in Midway Valley, Yucca Mountain Project, Nye County, Nevada; Yucca Mountain Site Characterization Project

    SciTech Connect (OSTI)

    Gibson, J.D.; Swan, F.H.; Wesling, J.R.; Bullard, T.F.; Perman, R.C.; Angell, M.M.; DiSilvestro, L.A.

    1992-01-01

    Midway Valley, located at the eastern base of the Yucca Mountain in southwestern Nevada, is the preferred location of the surface facilities for the potential high-level nuclear waste repository at Yucca Mountain. One goal in siting these surface facilities is to avoid faults that could produce relative displacements in excess of 5 cm in the foundations of the waste-handling buildings. This study reviews existing geologic and geophysical data that can be used to assess the potential for surface fault rupture within Midway Valley. Dominant tectonic features in Midway Valley are north-trending, westward-dipping normal faults along the margins of the valley: the Bow Ridge fault to the west and the Paintbrush Canyon fault to the east. Published estimates of average Quaternary slip rates for these faults are very low but the age of most recent displacement and the amount of displacement per event are largely unknown. Surface mapping and interpretive cross sections, based on limited drillhole and geophysical data, suggest that additional normal faults, including the postulated Midway Valley fault, may exist beneath the Quaternary/Tertiary fill within the valley. Existing data, however, are inadequate to determine the location, recency, and geometry of this faulting. To confidently assess the potential for significant Quaternary faulting in Midway Valley, additional data are needed that define the stratigraphy and structure of the strata beneath the valley, characterize the Quaternary soils and surfaces, and establish the age of faulting. The use of new and improved geophysical techniques, combined with a drilling program, offers the greatest potential for resolving subsurface structure in the valley. Mapping of surficial geologic units and logging of soil pits and trenches within these units must be completed, using accepted state-of-the-art practices supported by multiple quantitative numerical and relative age-dating techniques.

  18. EA-1848: Fulcrum Sierra Waste-to-Ethanol Facility in McCarran...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Fulcrum Sierra Waste-to-Ethanol Facility in McCarran, Storey County, NV EA-1848: Fulcrum Sierra Waste-to-Ethanol Facility in McCarran, Storey County, NV EA-1848: Final ...

  19. EIS-0432: Medicine Bow Fuel & Power Coal-to-Liquid Facility in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Medicine Bow Fuel & Power Coal-to-Liquid Facility in Carbon County, WY EIS-0432: Medicine Bow Fuel & Power Coal-to-Liquid Facility in Carbon County, WY Documents Available for ...

  20. Working with SRNL - Our Facilities - HTRL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Technology Research Laboratory Working with SRNL Our Facilities - Hydrogen Technology Research Laboratory (HTRL) The Savannah River National Laboratory (SRNL) has teamed with Aiken County to establish a laboratory at the Savannah River Research Campus, a County-owned research park adjacent to the Savannah River Site. Aiken County designed, constructed and maintains the 60,000-square-foot Applied Research Center (ARC) and leases portions of that facility to house SRNL's Hydrogen

  1. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  2. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    SciTech Connect (OSTI)

    Mueller, Robert P.; Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  3. Accident Investigation of the September 20, 2012 Fatal Fall from the Dworshak-Taft #1 Transmission Tower, at the Bonneville Power Marketing Administration

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report is an independent product of the Level l Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Levell Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting

  4. Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

  5. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  6. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Batten, G.; Cushing, Aaron W.; Kim, Jin A.; Johnson, Gary E.; Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.; Carpenter, Scott M.; Deng, Zhiqun; Etherington, D. J.; Fischer, Eric S.; Fu, Tao; Greiner, Michael J.; Hennen, Matthew J.; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Zimmerman, Shon A.

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  7. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  8. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  9. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  10. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  11. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  12. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  13. Imperial County geothermal development annual meeting: summary

    SciTech Connect (OSTI)

    Not Available

    1983-01-01

    All phases of current geothermal development in Imperial County are discussed and future plans for development are reviewed. Topics covered include: Heber status update, Heber binary project, direct geothermal use for high-fructose corn sweetener production, update on county planning activities, Brawley and Salton Sea facility status, status of Imperial County projects, status of South Brawley Prospect 1983, Niland geothermal energy program, recent and pending changes in federal procedures/organizations, plant indicators of geothermal fluid on East Mesa, state lands activities in Imperial County, environmental interests in Imperial County, offshore exploration, strategic metals in geothermal fluids rebuilding of East Mesa Power Plant, direct use geothermal potential for Calipatria industrial Park, the Audubon Society case, status report of the Cerro Prieto geothermal field, East Brawley Prospect, and precision gravity survey at Heber and Cerro Prieto geothermal fields. (MHR)

  14. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transfers; McCracken County, Kentucky | Department of Energy 27: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky SUMMARY DOE's Portsmouth/Paducah Project Office prepared an EA that assesses the potential environmental impacts of the proposed transfer of land and facilities at the Paducah Gaseous Diffusion Plant from DOE to other

  15. Los Angeles County- LEED for County Buildings

    Broader source: Energy.gov [DOE]

    In January 2007, the Los Angeles County Board of Supervisors adopted rules to require that all new county buildings greater than 10,000 square feet be LEED Silver certified. All buildings...

  16. Stowe Power Production Plant Biomass Facility | Open Energy Informatio...

    Open Energy Info (EERE)

    Stowe Power Production Plant Sector Biomass Facility Type Landfill Gas Location Montgomery County, Pennsylvania Coordinates 40.2290075, -75.3878525 Show Map Loading map......

  17. Chestnut Ridge Gas Recovery Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Chestnut Ridge Gas Recovery Sector Biomass Facility Type Landfill Gas Location Anderson County, Tennessee Coordinates 36.0809574, -84.2278796 Show Map Loading map......

  18. WWTP Power Generation Station Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    WWTP Power Generation Station Sector Biomass Facility Type Non-Fossil Waste Location Alameda County, California Coordinates 37.6016892, -121.7195459 Show Map Loading map......

  19. West Point Treatment Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    West Point Treatment Plant Sector Biomass Facility Type Non-Fossil Waste Location King County, Washington Coordinates 47.5480339, -121.9836029 Show Map Loading map......

  20. EA-1901: Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal for DOE’s Bonneville Power Administration to support the Kootenai Tribe of Idaho’s construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort.

  1. Project Reports for Forest County Potawatomi Community - 2014 Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4 Project Project Reports for Forest County Potawatomi Community - 2014 Project Forest County Potawatomi Community (FCPC), in collaboration with a selected contractor, will install and operate approximately 875 kilowatts (kW) of solar photovoltaic (PV) systems at a minimum of eight tribal facilities in Milwaukee and Forest Counties. Learn more about this project or find details in the below status reports. March 2014 status report (1.31 MB) May 2015 status report (2.65

  2. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    SciTech Connect (OSTI)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluatedlight-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  3. Cutting Electricity Costs in Miami-Dade County, Florida

    ScienceCinema (OSTI)

    Alvarez, Carlos; Oliver, LeAnn; Kronheim, Steve; Gonzalez, Jorge; Woods-Richardson, Kathleen;

    2013-05-29

    Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity needs.

  4. Washington County, New York: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Falls, LLC Biomass Facility Places in Washington County, New York Argyle, New York Cambridge, New York Easton, New York Fort Ann, New York Fort Edward, New York Granville, New...

  5. Renewable Energy Deployment Projects for Forest County Potawatomi Community

    Broader source: Energy.gov [DOE]

    With funding and technical support from the U.S. Department of Energy, the Forest County Potawatomi Community (FCPC) has significantly reduced greenhouse gas emissions through the deployment of a biogas generation facility and solar photovoltaic system.

  6. Forest County Potawatomi Community- 2010 Energy Efficiency Lighting Project

    Broader source: Energy.gov [DOE]

    The Forest County Potawatomi Community ("FCPC" or "Tribe") owns a six-story parking facility that consists of two separate buildings located on fee land adjacent to its Milwaukee Bingo Casino operation.

  7. Cutting Electricity Costs in Miami-Dade County, Florida

    SciTech Connect (OSTI)

    Alvarez, Carlos; Oliver, LeAnn; Kronheim, Steve; Gonzalez, Jorge; Woods-Richardson, Kathleen

    2011-01-01

    Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity needs.

  8. Cutting Electricity Costs in Miami-Dade County, Florida

    Broader source: Energy.gov [DOE]

    Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity...

  9. Project Reports for Forest County Potawatomi Community- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Forest County Potawatomi Community ("FCPC" or "Tribe") owns a six-story parking facility that consists of two separate buildings located on fee land adjacent to its Milwaukee Bingo Casino operation.

  10. Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse

    SciTech Connect (OSTI)

    Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

    2011-11-22

    Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

  11. City of North Bonneville, Washington: Geothermal Exploration Project, production test well, Phase II. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130/sup 0/F (54.4/sup 0/C). Depth projections to a 130/sup 0/F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50/sup 0/C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Large upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

  12. EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

  13. EIS-0522: Melvin R. Sampson Hatchery, Yakima Basin Coho Project; Kittitas County, Washington

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) is preparing an EIS that analyzes the potential environmental impacts of constructing and operating a proposed hatchery for coho salmon. BPA’s proposed action is to fund the Confederated Tribes of the Yakama Nation construction of a hatchery on 50 acres of land owned by the Yakama Nation in Kittitas County, Washington. Hatchery operations would include collection of adult coho for broodstock at the existing Roza and Sunnyside dams, incubation and rearing of up to 200,000 juvenile coho salmon, and release of smolts into the Yakima and Naches Rivers.

  14. Nuclear Facilities Production Facilities

    National Nuclear Security Administration (NNSA)

    Facilities Production Facilities Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Sand 2011-4582P. ENERGY U.S. DEPARTMENT OF Gamma Irradiation Facility (GIF) The GIF provides test cells for the irradiation of experiments with high-intensity gamma ray sources. The main features

  15. Broward County- Green Building Policy

    Broader source: Energy.gov [DOE]

    In October 2008, Board of County Commissioners of Broward County passed a resolution creating the County Green Building Policy. All new County-owned and operated buildings must achieve a minimum...

  16. County Wind Ordinance Standards

    Broader source: Energy.gov [DOE]

    Assembly Bill 45 of 2009 authorized counties to adopt ordinances to provide for the installation of small wind systems (50 kW or smaller) outside urbanized areas but within the county's...

  17. EA-2016: Willow Creek Wind Farm; Butte County, South Dakota | Department of

    Energy Savers [EERE]

    Energy 2016: Willow Creek Wind Farm; Butte County, South Dakota EA-2016: Willow Creek Wind Farm; Butte County, South Dakota SUMMARY DOE's Western Area Power Administration is preparing an EA that analyzes the potential environmental impacts of the proposed Willow Creek Wind Energy Facility in Butte County, South Dakota. The EA reviews the potential environmental impacts of constructing, operating, and maintaining a 103-megawatt (MW) nameplate capacity wind power generating facility

  18. Kiowa County Commons Building

    Broader source: Energy.gov [DOE]

    This poster describes the energy efficiency features and sustainable materials used in the Kiowa County Commons Building in Greensburg, Kansas.

  19. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  20. Costilla County Biodiesel Pilot Project

    SciTech Connect (OSTI)

    Doon, Ben; Quintana, Dan

    2011-08-25

    The Costilla County Biodiesel Pilot Project has demonstrated the compatibility of biodiesel technology and economics on a local scale. The project has been committed to making homegrown biodiesel a viable form of community economic development. The project has benefited by reducing risks by building the facility gradually and avoiding large initial outlays of money for facilities and technologies. A primary advantage of this type of community-scale biodiesel production is that it allows for a relatively independent, local solution to fuel production. Successfully using locally sourced feedstocks and putting the fuel into local use emphasizes the feasibility of different business models under the biodiesel tent and that there is more than just a one size fits all template for successful biodiesel production.

  1. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  2. ARM - SGP Extended Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extended Facility SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration...

  3. ARM - SGP Intermediate Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Intermediate Facility SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration...

  4. ARM - SGP Central Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Central Facility SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration...

  5. EIS-0343: COB Energy Facility

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to support the COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation (PERC), to construct a 1,160-megawatt (MW) natural gas-fired, combined-cycle electric generating plant in Klamath County, Oregon, near the city of Bonanza.

  6. Property:FIPS County Code | Open Energy Information

    Open Energy Info (EERE)

    County, Kentucky + 001 + Adair County, Missouri + 001 + Adair County, Oklahoma + 001 + Adams County, Colorado + 001 + Adams County, Idaho + 003 + Adams County, Illinois + 001 +...

  7. Huntington Resource Recovery Facility Biomass Facility | Open...

    Open Energy Info (EERE)

    Resource Recovery Facility Biomass Facility Jump to: navigation, search Name Huntington Resource Recovery Facility Biomass Facility Facility Huntington Resource Recovery Facility...

  8. Wheelabrator Sherman Energy Facility Biomass Facility | Open...

    Open Energy Info (EERE)

    Sherman Energy Facility Biomass Facility Jump to: navigation, search Name Wheelabrator Sherman Energy Facility Biomass Facility Facility Wheelabrator Sherman Energy Facility Sector...

  9. EA-1848: Fulcrum Sierra Waste-to-Ethanol Facility in McCarran, Storey

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County, NV | Department of Energy 8: Fulcrum Sierra Waste-to-Ethanol Facility in McCarran, Storey County, NV EA-1848: Fulcrum Sierra Waste-to-Ethanol Facility in McCarran, Storey County, NV June 1, 2011 EA-1848: Final Environmental Assessment Loan Guarantee To Fulcrum Sierra Biofuels, LLC For A Waste-To-Ethanol Facility In Mccarran, Storey County, Nevada June 21, 2011 EA-1848: Finding of No Significant Impact Loan Guarantee to Fulcrum Sierra Biofuels, LLC for Waste-to-Ethanol Facility in

  10. EA-1927: Conveyance of Land and Facilities at the Paducah Gaseous...

    Broader source: Energy.gov (indexed) [DOE]

    Draft EA for potential land and facilities transfers at the Paducah Gaseous Diffusion Plant in McCracken County, Kentucky. OPPORTUNITES FOR PUBLIC COMMENT No public comment...

  11. Byron Extended Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Byron Extended Facility Map

  12. Ashton Extended Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ashton Extended Facility Map

  13. User Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Facilities User Facilities User facility agreements allow Los Alamos partners and other entities to conduct research at our unique facilities. In 2011, LANL hosted more than 1,200 users at CINT, LANSCE, and NHMFL. Users came from across the DOE complex, from international academia, and from industrial companies from 45 states across the U.S. Unique world-class user facilities foster rich research opportunities Through its technology transfer efforts, LANL can implement user facility

  14. CX-005129: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Upgrade of Secondary Containment Facilities at Hatwai SubstationCX(s) Applied: B4.6Date: 01/18/2011Location(s): Nez Perce County, IdahoOffice(s): Bonneville Power Administration

  15. CX-004252: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace Two Broken Transformers Near the Roza Dam Adult Trap FacilityCX(s) Applied: B4.6Date: 10/13/2010Location(s): Kittitas County, WashingtonOffice(s): Bonneville Power Administration

  16. CX-000012: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eagle Junction Clearwire Wireless Communication FacilitiesCX(s) Applied: B1.7, B1.15, B1.19Date: 12/02/2009Location(s): Polk County, OregonOffice(s): Bonneville Power Administration

  17. CX-000606: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Nike Clearwire Wireless Communication FacilitiesCX(s) Applied: B1.7, B1.15, B1.19Date: 01/27/2010Location(s): Washington County, OregonOffice(s): Bonneville Power Administration

  18. CX-006778: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Alvey Maintenance Headquarters Pole Storage Facility UpgradesCX(s) Applied: B4.6Date: 08/24/2011Location(s): Lane County, OregonOffice(s): Bonneville Power Administration

  19. CX-003240: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Metering Equipment at Existing Facilities for Power SchedulingCX(s) Applied: B4.6Date: 07/12/2010Location(s): Lewis County, WashingtonOffice(s): Bonneville Power Administration

  20. CX-005132: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Upgrade of Secondary Containment Facilities at Dixie SubstationCX(s) Applied: B4.6Date: 01/24/2011Location(s): Elmore County, IdahoOffice(s): Bonneville Power Administration

  1. Douglas County | Open Energy Information

    Open Energy Info (EERE)

    County Jump to: navigation, search Name: Douglas County Address: 430 S E Main Street PO Box 2456 Place: Roseburg Zip: 97470 Region: United States Sector: Marine and Hydrokinetic...

  2. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  3. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect (OSTI)

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  4. EIS-0066: The Role of Bonneville Power Administration in the Pacific Northwest Power Supply System- including its Participation in a Hydro-Thermal Power Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this EIS to examine the environmental impacts of the Pacific Northwest Power Planning and Conservation Act, which will foster regional electric power planning in the four Northwest states, as well as increase BPA’s authority to address future power needs.

  5. Re-Analysis of Hydroacoustic Fish-Passage Data from Bonneville Dam after Spill-Discharge Corrections

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Kim, Jina; Weiland, Mark A.; Hughes, James S.; Fischer, Eric S.

    2007-06-07

    The U.S. Army Corps of Engineers - Portland District asked Pacific Northwest National Laboratory to re-analyze four years of fixed-aspect hydroacoustic data after the District made adjustments to spill discharge estimates. In this report, we present new estimates of all major fish-passage metrics for study years 2000, 2001, 2002, and 2004, as well as estimates for 2005. This study supports the Portland District and its effort to maximize survival of juvenile salmon passing Bonneville Dam. Major passage routes through Bonneville Dam include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines at Powerhouse 2 (B2) and a sluiceway including the B2 Corner Collector. The original reports and all associated results, discussion, and conclusions for non flow-related metrics remain valid and useful, but effectiveness measures for study years 2000, 2001, 2002, and 2004 as reported in previous reports by Ploskey et al. should be superseded with the new estimates reported here. The fish-passage metrics that changed the most were related to effectiveness. Re-analysis produced spill effectiveness estimates that ranged from 12% to 21% higher than previous estimates in spring and 16.7% to 27.5% higher in summer, but the mean spill effectiveness over all years was only slightly above 1:1 (1.17 for spring and 1.29 for summer). Conversely surface-passage effectiveness decreased in the years this metric was measured (by 10.1% in spring and 10.7% in summer of 2002 and 9.5% in spring and 10.2% in summer of 2004). The smallest changes in the re-analysis were in project fish passage efficiency (0%-1%) and spill efficiency (0.9%-3.0%).

  6. User Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Facilities User Facilities A new research frontier awaits! Our door is open, and we thrive on mutually beneficial partnerships and collaborations that drive innovations and new technologies. Unique world-class user facilities foster rich research opportunities Through its technology transfer efforts, Los Alamos National Laboratory can implement user facility agreements that allow its partners and other entities to conduct research at many of its unique facilities. While our largest user

  7. Facility Representatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-03-01

    This standard, DOE-STD-1063, Facility Representatives, defines the duties, responsibilities and qualifications for Department of Energy (DOE) Facility Representatives, based on facility hazard classification; risks to workers, the public, and the environment; and the operational activity level. This standard provides the guidance necessary to ensure that DOE’s hazardous nuclear and non-nuclear facilities have sufficient staffing of technically qualified facility representatives (FRs) to provide day-to-day oversight of contractor operations.

  8. Eagle County, Colorado Data Dashboard

    Broader source: Energy.gov [DOE]

    The data dashboard for Eagle County, Colorado, a partner in the Better Buildings Neighborhood Program.

  9. EIS-0432: Medicine Bow Fuel & Power Coal-to-Liquid Facility in Carbon

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County, WY | Department of Energy 2: Medicine Bow Fuel & Power Coal-to-Liquid Facility in Carbon County, WY EIS-0432: Medicine Bow Fuel & Power Coal-to-Liquid Facility in Carbon County, WY Documents Available for Download November 27, 2009 EIS-0432: Notice of Intent to Prepare an Environmental Impact Statement Federal Loan Guarantee to Support the Construction and Startup of the Medicine Bow Fuel & Power Coal-to-Liquid Facility in Carbon County, Wyoming December 16, 2009

  10. Vegetation N A County

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N A County road 39 Community D Bottomland Hardwood _ Mixed Swamp Forest _ Bottomland Hardwood/Pine .** TES Plants (1) ~ Site Boundary ~ Roads m. Streams N County Line em Hydric Soils 410 o 410 820 Meters Soils Soil Series _ Pk D VeD Figure 18-2. Plant communities and soils of the Boiling Springs Natural Area. 18-7 Set-Aside 18: Boiling Springs Natural Area

  11. PP-34 Public Utility District No. 1 of Pend Oreille County |...

    Broader source: Energy.gov (indexed) [DOE]

    Public Utility District No. 1 of Pend Oreille County to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. PDF icon PP-34 Public Utility ...

  12. EECBG Success Story: A Michigan County Unearths Savings with Geothermal Energy

    Broader source: Energy.gov [DOE]

    Looking at the Kent County Correctional Facility in Michigan you would never know that underneath the complex is a technology that is saving taxpayers on average $100,000 a year. Learn more.

  13. ORISE: Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORISE Facilities Unique laboratories and training centers among the assets managed on behalf of the U.S. Department of Energy The Oak Ridge Institute for Science and Education (ORISE) is home to a number of on- and off-site facilities that support the U.S. Department of Energy's (DOE) science education and research mission. From on-site medical laboratories to radiation emergency medicine training facilities, ORISE facilities are helping to address national needs in the following areas:

  14. Science Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Science Facilities The focal point for basic and applied R&D programs with a primary focus on energy but also encompassing medical, biotechnology, high-energy physics, and advanced scientific computing programs. Center for Integrated Nanotechnologies» Dual Axis Radiographic Hydrodynamic Test Facility (DARHT)» Electron Microscopy Lab» Ion Beam Materials Lab» Isotope Production Facility» Los Alamos Neutron Science Center» Lujan Center» Matter-Radiation Interactions in

  15. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-10-24

    Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

  16. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-11-16

    Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

  17. Phelps County Ethanol | Open Energy Information

    Open Energy Info (EERE)

    County Ethanol Jump to: navigation, search Name: Phelps County Ethanol Place: Nebraska Product: Focused on ethanol production. References: Phelps County Ethanol1 This article is...

  18. Property:County | Open Energy Information

    Open Energy Info (EERE)

    Fort Geothermal Project + Millard County, Utah + Coyote Canyon Geothermal Project + Churchill County, NV + Crump Geyser Geothermal Project + Lake County, UT + D Darrough Hot...

  19. Workplace Charging Challenge Partner: Boulder County | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boulder County partners with the U.S. Department of Energy to promote electric vehicle charging stations at workplaces Boulder County, CO - Boulder County has joined the Workplace ...

  20. Rutland County Data Dashboard | Department of Energy

    Energy Savers [EERE]

    Data Dashboard Rutland County Data Dashboard The data dashboard for Rutland County, Vermont, a partner in the Better Buildings Neighborhood Program. Rutland County Data Dashboard ...

  1. Computational Fluid Dynamics Modeling of the Bonneville Project: Tailrace Spill Patterns for Low Flows and Corner Collector Smolt Egress

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    In 2003, an extension of the existing ice and trash sluiceway was added at Bonneville Powerhouse 2 (B2). This extension started at the existing corner collector for the ice and trash sluiceway adjacent to Bonneville Powerhouse 2 and the new sluiceway was extended to the downstream end of Cascade Island. The sluiceway was designed to improve juvenile salmon survival by bypassing turbine passage at B2, and placing these smolt in downstream flowing water minimizing their exposure to fish and avian predators. In this study, a previously developed computational fluid dynamics model was modified and used to characterized tailrace hydraulics and sluiceway egress conditions for low total river flows and low levels of spillway flow. STAR-CD v4.10 was used for seven scenarios of low total river flow and low spill discharges. The simulation results were specifically examined to look at tailrace hydraulics at 5 ft below the tailwater elevation, and streamlines used to compare streamline pathways for streamlines originating in the corner collector outfall and adjacent to the outfall. These streamlines indicated that for all higher spill percentage cases (25% and greater) that streamlines from the corner collector did not approach the shoreline at the downstream end of Bradford Island. For the cases with much larger spill percentages, the streamlines from the corner collector were mid-channel or closer to the Washington shore as they moved downstream. Although at 25% spill at 75 kcfs total river, the total spill volume was sufficient to "cushion" the flow from the corner collector from the Bradford Island shore, areas of recirculation were modeled in the spillway tailrace. However, at the lowest flows and spill percentages, the streamlines from the B2 corner collector pass very close to the Bradford Island shore. In addition, the very flow velocity flows and large areas of recirculation greatly increase potential predator exposure of the spillway passed smolt. If there is

  2. EIS-0072: Great Plains Gasification Project, Mercer County, North Dakota

    Broader source: Energy.gov [DOE]

    The Office of Fossil Energy prepared this EIS to evaluate the impacts of a project to construct a 125 million cubic feet per day coal gasification facility located in Mercer County, North Dakota. The Office of Fossil Energy adopted three environmental impact evaluation documents prepared by other Federal agencies to develop this EIS.

  3. Forest County Potawatomi Tribe Cuts Emissions, Promotes Green Growth

    Broader source: Energy.gov [DOE]

    In pursuit of its long-term energy goal of reducing its carbon footprint to zero, the Forest County Potawatomi Community has adopted an integrated renewable energy deployment plan that includes the installation of solar, biogas, and biomass energy systems to heat, cool, and power its tribal facilities.

  4. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    SciTech Connect (OSTI)

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  5. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    SciTech Connect (OSTI)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  6. Santa Clara County- Green Building Policy for County Government Buildings

    Broader source: Energy.gov [DOE]

    In February 2006, the Santa Clara County Board of Supervisors approved a Green Building Policy for all county-owned or leased buildings. The standards were revised again in September 2009.

  7. EA-0928: Burlington Bottoms Wildlife Mitigation Project, Multnomah County, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund wildlife management and enhancement activities for the Burlington...

  8. EA-1995: Trestle Bay Ecosystem Restoration Project, Clatsop County...

    Broader source: Energy.gov (indexed) [DOE]

    prepared, with DOE's Bonneville Power Administration (BPA) as a cooperating agency, an EA that evaluates the potential environmental impacts of a proposal to improve estuary...

  9. EIS-0451: Hooper Springs Transmission Project, Caribou County...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's...

  10. Fayette County Better Buildings Initiative

    SciTech Connect (OSTI)

    Capella, Arthur

    2015-03-04

    The Fayette County Better Buildings Initiative represented a comprehensive and collaborative approach to promoting and implementing energy efficiency improvements. The initiative was designed to focus on implementing energy efficiency improvements in residential units, while simultaneously supporting general marketing of the benefits of implementing energy efficiency measures. The ultimate goal of Fayette County’s Better Buildings Initiative was to implement a total of 1,067 residential energy efficiency retrofits with a minimum 15% estimated energy efficiency savings per unit. Program partners included: United States Department of Energy, Allegheny Power, and Private Industry Council of Westmoreland-Fayette, Fayette County Redevelopment Authority, and various local partners. The program was open to any Fayette County residents who own their home and meet the prequalifying conditions. The level of assistance offered depended upon household income and commitment to undergo a BPI – Certified Audit and implement energy efficiency measures, which aimed to result in at least a 15% reduction in energy usage. The initiative was designed to focus on implementing energy efficiency improvements in residential units, while simultaneously supporting general marketing of the benefits of implementing energy efficiency measures. Additionally, the program had components that involved recruitment and training for employment of persons in the energy sector (green jobs), as well as marketing and implementation of a commercial or community facilities component. The residential component of Fayette County’s Better Buildings Initiative involved a comprehensive approach, providing assistance to low- moderate- and market-rate homeowners. The initiative will also coordinate activities with local utility providers to further incentivize energy efficiency improvements among qualifying homeowners. The commercial component of Fayette County’s Better Building Initiative involved grants

  11. San Diego County- Wind Regulations

    Broader source: Energy.gov [DOE]

    The County of San Diego has established zoning guidelines for wind turbine systems of varying sizes in the unincorporated areas of San Diego County. Wind turbine systems can be classified as small...

  12. Hamilton County- Home Improvement Program

    Broader source: Energy.gov [DOE]

    The Home Improvement Program (HIP) in Hamilton County, Ohio, originally opened in 2002, and was reinstated in May 2008. The HIP loan allows homeowners in Hamilton County communities to borrow money...

  13. Los Angeles County- Commercial PACE

    Broader source: Energy.gov [DOE]

    Businesses in Los Angeles County may be eligible for the county's Property Assessed Clean Energy (PACE) program. PACE programs allow businesses to finance energy and water efficiency projects which...

  14. Montgomery County- Green Power Purchasing

    Broader source: Energy.gov [DOE]

    NOTE: County Bill 9-14 enacted in 2014 requires at least 50% of the County Government's electric power usage be supplied by renewable energy by fiscal year 2015, and 100% of the by 2016.

  15. San Diego County- Solar Regulations

    Broader source: Energy.gov [DOE]

    The County of San Diego has established zoning guidelines for solar electric systems of varying sizes in the unincorporated areas of San Diego County. Photovoltaic (PV) systems which have their...

  16. Riverside County- Sustainable Building Policy

    Office of Energy Efficiency and Renewable Energy (EERE)

    In February 2009, the County of Riverside Board of Supervisors adopted Policy Number H-29, creating the Sustainable Building Policy. The Policy requires that all new county building projects...

  17. Boulder County- Elevations Energy Loans

    Broader source: Energy.gov [DOE]

    Elevations Credit Union has partnered with Boulder County and the City/County of Denver to offer this full-suite of services. Both EnergySmart and the Denver Energy Challenge help residents and b...

  18. Santa Clara County- Zoning Ordinance

    Broader source: Energy.gov [DOE]

    Santa Clara County's Zoning Ordinance includes standards for wind and solar structures for residential, agricultural, and commercial uses.

  19. Beamlines & Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Imaging Group: Beamlines The X-ray Micrscopy and Imaging Group operates several beamlines and facilities. The bending magnet beamline (2-BM) entertaines 2 general user programs in...

  20. Facility Representatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-04-06

    REPLACED BY DOE-STD-1063 | SUPERSEDING DOE-STD-1063-2000 (MARCH 2000) The purpose of the DOE Facility Representative Program is to ensure that competent DOE staff personnel are assigned to oversee the day-to-day contractor operations at DOE’s hazardous nuclear and non-nuclear facilities.

  1. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-22

    This Order establishes facility and programmatic safety requirements for Department of Energy facilities, which includes nuclear and explosives safety design criteria, fire protection, criticality safety, natural phenomena hazards mitigation, and the System Engineer Program. Cancels DOE O 420.1A. DOE O 420.1B Chg 1 issued 4-19-10.

  2. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-04

    The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. This Page Change is limited in scope to changes necessary to invoke DOE-STD-1104, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, and revised DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis as required methods. DOE O 420.1C Chg 1, dated 2-27-15, supersedes DOE O 420.1C.

  3. Gas Utilization Facility Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Gas Utilization Facility Biomass Facility Jump to: navigation, search Name Gas Utilization Facility Biomass Facility Facility Gas Utilization Facility Sector Biomass Facility Type...

  4. Total Energy Facilities Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Energy Facilities Biomass Facility Jump to: navigation, search Name Total Energy Facilities Biomass Facility Facility Total Energy Facilities Sector Biomass Facility Type...

  5. San Diego County, California | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diego County, California San Diego County, California Energy Upgrade California in San Diego County Location: San Diego County, California Seed Funding: $3.9 million-a portion of Los Angeles County's $30 million funding Target Building Types: Residential (single-family and multifamily) Website: https://sdgehomeupgrade.com Energy Upgrade California Motivates Home Improvements in San Diego County As the third largest metropolitan area in California, San Diego County plays a significant role in the

  6. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish facility safety requirements for the Department of Energy, including National Nuclear Security Administration. Cancels DOE O 420.1. Canceled by DOE O 420.1B.

  7. Property:Incentive/AddlPlaceCounty | Open Energy Information

    Open Energy Info (EERE)

    + Anne Arundel County, Maryland + B Baltimore County - Solar and Geothermal Equipment Property Tax Credit (Maryland) + Baltimore County, Maryland + Baltimore County - Wind...

  8. 350 City County Building

    Office of Legacy Management (LM)

    (. - ,- Department of Eilqgy Washington, DC20585 ,. i x \ .The Honorable Wellington E. Webb .' '. ' 350 City County Building / Denver, Colorado 80202 ., ; Dear Mayor Webb: ., ~, Secretary of Energy' Hazel O'Leary has announced's new approach to openness in the Department of Energy,(OOE) and its communications with the public. In support of this initiative, we,are pleased to forward the'enclosed'information related to the former Uhiversity of Denver Research Institute site in your, jurisdiction

  9. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-22

    The order establishes facility and programmatic safety requirements for nuclear and explosives safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and the System Engineer Program.Chg 1 incorporates the use of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 420.1A.

  10. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-06-21

    DOE-STD-1104 contains the Department's method and criteria for reviewing and approving nuclear facility's documented safety analysis (DSA). This review and approval formally document the basis for DOE, concluding that a facility can be operated safely in a manner that adequately protects workers, the public, and the environment. Therefore, it is appropriate to formally require implementation of the review methodology and criteria contained in DOE-STD-1104.

  11. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-20

    The objective of this Order is to establish facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation. The Order has Change 1 dated 11-16-95, Change 2 dated 10-24-96, and the latest Change 3 dated 11-22-00 incorporated. The latest change satisfies a commitment made to the Defense Nuclear Facilities Safety Board (DNFSB) in response to DNFSB recommendation 97-2, Criticality Safety.

  12. DOE - Office of Legacy Management -- Geothermal Test Facility - 001

    Office of Legacy Management (LM)

    Geothermal Test Facility - 001 FUSRAP Considered Sites Site: Geothermal Test Facility (001) Remediated; records are managed by DOE LM. More information at http://www.lm.doe.gov/geothermal/Sites.aspx Designated Name: Not Designated under FUSRAP Alternate Name: Geothermal Test Facility, CA, Site Location: Imperial County, California Evaluation Year: Not considered for FUSRAP - in another program Site Operations: Geothermal testing projects Site Disposition: Remediated by DOE Office of

  13. Snohomish County Biodiesel Project

    SciTech Connect (OSTI)

    Terrill Chang; Deanna Carveth

    2010-02-01

    Snohomish County in western Washington State began converting its vehicle fleet to use a blend of biodiesel and petroleum diesel in 2005. As prices for biodiesel rose due to increased demand for this cleaner-burning fuel, Snohomish County looked to its farmers to “grow” this fuel locally. Suitable seed crops that can be crushed to extract oil for use as biodiesel feedstock include canola, mustard, and camelina. The residue, or mash, has high value as an animal feed. County farmers began with 52 acres of canola and mustard crops in 2006, increasing to 250 acres and 356 tons in 2008. In 2009, this number decreased to about 150 acres and 300 tons due to increased price for mustard seed.

  14. Working with SRNL - Our Facilities - Glovebox Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SRNL Our Facilities - Glovebox Facilities Govebox Facilities are sealed, protectively-lined compartments with attached gloves, allowing workers to safely handle dangerous materials...

  15. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 8, 2014 Time: 2:00 p.m. - 5:00 p.m. Pacific Location: Benton PUD 2721 W. 10th Avenue Kennewick, WA 99336 map or by LiveMeeting and telephone 1-866-733-2934, Code: 4157819...

  16. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1: Programs implemented via CAPs * BPA to State and Tribal Grant Program - Carrie Nelson, State and Tribal Grant Program Manager, BPA EE * How states work with CAPs - Michael...

  17. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values. The time for dramatic change is...

  18. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2014, Caines-Willman,Sandra L (CONTR) - TSES-TPP-2 wrote: Hello Jason, Would you be available for an hour on either Wednesday, June 25 from 8 - 9 a.m....

  19. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on Bilateral Transfers of Energy Efficiency Incentive Funds Introduction As part of BPA's Energy Conservation Agreements (ECA), each of BPA's public utility customers, prior to...

  20. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    large projects once specific, pre- identified milestones have been reached. The cash flow provided by progress payments can be important to ensure large custom projects...

  1. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Brown Bag: Commercial Measure Review Part One When: Wednesday, October 21, 2015 Time: 12:00 pm - 1:00 pm PDT Description: Please join us for a Brown Bag on Commercial Measure...

  2. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    filename prior to submission Why it is important: BPA would like to minimize both the burden associated with implementing a uniform naming convention and the potential delays and...

  3. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    throughout the region, these programs allow for the aggregation of demand to ensure economies of scale and help ensure that savings targets will be achieved. These programs...

  4. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Brown Bag: Air Northwest: The HVAC TAN When: Wednesday, July 29th, 2015 Time: 12:00 pm - 1:00 pm PDT Description: The Commercial Team has news to share about the launch of the...

  5. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Training: Fundamentals of Building Measurement & Verification (CMVP prep) When: 2222016 8:00am - 2242016 5:00pm Where: Tacoma Public Utilities Administration Building 3628 S....

  6. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exit signs, kitchen equipment, network power management, power strips, showerheads, clothes washers, water heaters and ag stock tanks. Check IM for detailed requirements. c....

  7. Bonneville Power Administration Overview

    Energy Savers [EERE]

    BPA Service Area Columbia Basin Federal Dams: Canadian Dams ... O N Promoting Renewable Generation * BPA has made a ... and operation of any hydroelectric project of the Columbia ...

  8. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service o Block and SliceBlock customers for FY2012-FY2014 Diurnal Flattening Service Forced Outage Reserves 2011 - SECOND NOTICE DEADLINE FOR LOAD-GROWTH RATE * Second...

  9. Northwest, the Bonneville Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    voltage power lines that move large amounts of power from hydroelectric projects and power plants to urban centers hundreds of miles away. To keep the electricity flowing safely...

  10. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 20, 2014 Time: 9:00 am - 3:00pm Pacific Location: BPA Rates Hearing Room 1201 Lloyd Blvd, Suite 200, Portland, Oregon or by LiveMeeting Click here and telephone...

  11. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    this number in any correspondence with the Agency about your request. You requested: Corona & Field Effects Version 3.0 software program. We have reviewed your letter and have...

  12. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Key Terms Bi-lateral Funding - A current funding mechanism that provides BPA capital budget to public utility customers to fund qualified energy efficiency incentive payments...

  13. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    below) What is the problemopportunity? Who is this an opportunity for? Utility? CAP? BPA? Other? What should this group work on? 3:30 Prioritization 4:00 Recap of next...

  14. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utility Account Number o SRR Designation o Performance Payment (kWh) o % of EEI Budget Cap 3. Enter the dollar figure you would like your performance payment limited to for the...

  15. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (the amount paid from BPA to the customer after applying an applicable project cost cap) totaling more than 50% of a customer's rate period TOCA- based Energy Efficiency...

  16. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L. O'Leary, or others) between the periods of May 15, 2013-July 1, 2014, regarding my status as a student intern conversion under Pathways or conversion under Schedule A hiring...

  17. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weatherization Program Support, BPA 2:00 One Utility's Low Income Program - Jeremy Stewart, Tacoma Power 2:30 CAP and Utility Collaboration * UtilityCAP contracts for...

  18. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    below. Deemed Measure Upload Template The following instructions apply to this Excel spreadsheet and are in addition to the existing instructions for the Deemed Measure...

  19. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects internally with no proposals required, but it requires utilities to assume the risk of cost-effectiveness and the possibility that BPA may not provide reimbursement if...

  20. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the expiration date of Land Use Agreement No 960067 until December 31, 2020. All other terms and conditions of Land Use Agreement No. 960067 and Amendments I. 2. 3. 4. 5. and 6...

  1. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Presentation and Discussion: Join the meeting: https:www.livemeeting.comccbpajoin?idP2K 5PS &roleattend&pwdR%3A*%23%21bj9 Add to my Outlook Calendar: https:...

  2. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TES O . SSCURITh AND CONTINUITY OF OPERATIONS December 30, 2013 In reply refer to: NN-1 Ted Sickinger The Oregonian 1320 SW Broadway Portland, OR 97201 FOIA BPA-201 4-00312-F Dear...

  3. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    methodology with Department Of Energy (DOE). BPA captures the number of hours worked for prime contractors as well as first tier sub-contractors which is converted to full time...

  4. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    similar methods for over a decade. BPA's analysis builds on this work. BPA's market research on Momentum Savings is similar to research performed outside the region and our...

  5. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 20. 2010 In reply refer to: DK-7 Mr. Richard van Dijk Another Way BPA RE: FOIA BPA-2011-00126-F Dear Mr. van Dijk: This is a final response to your request lUr...

  6. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DK-7 Mr. Richard van C)ijk Another Way BPA Ex 6 RE: FOIA BPA-2012-00294-F Dear Mr. van Dijk: This is a final response to your request for information that you made to the...

  7. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oregon 97208-3621 PUBLIC AFFAIRS April 20, 2011 In reply refer to: DK-7 Myrtle June Chapman RE: FOIA Request BPA-2011-01000-F Dear Ms. Chapman: Thank you for your request for...

  8. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    correspondence with the Agenc y about your request. You have renuested the following; Prop ide copies of all A gcmic I)ccision Frameworks related to the Network Open Season 2009...

  9. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    14 Richard J. Gistelli Eugene 503.575.9519 richard.gistelli@energysmartindustrial.com Emerald PUD 102809 Richard J. Gistelli Eugene 503.575.9519 richard.gistelli@energysmartindu...

  10. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Company McClure Engineering, Inc. Expertise General industrial processing, food processing, pumping systems (esp. in AG), and compressed air. Address 507 Main Ave...

  11. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In reply refer to: PGPO Renata Kurschner Director, Generation Resource Management BC Hydro and Power Authority 691 1 Southpoint Drive, El5 Burnaby, B.C., Canada V3N 4 x 8 Dear...

  12. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8312012 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N File Naming Tool: Detailed Instructions 1. Select the Cell Labeled Document Type and use the dropdown menu to...

  13. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    942012 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Overview: Performance Payment Calculator What it is The Performance Payment Calculator is the tool BPA has...

  14. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Progress Payment Calculator The Progress Payment Calculator allows utilities to submit detailed information for the qualifying pre-approved progress payments. In order to qualify...

  15. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O&M Costs (Column AZ) Present Value of Periodic Capital Replacement Cost (Column BA) Power System Transmission System Coincident Factor (Column BB) Distribution System...

  16. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as well as entry into National Science Bowl Portland, Ore. - As many as 135 teams of middle and high school students from across western portions of Washington and Oregon will...

  17. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA's willingness to pay 1.00 1.00 1.00 1.00 4.00 BPA reimbursement requested by utility 1.00 1.00 1.00 0.00 3.00 Utility's rebate to end-users 1.25 1.25 1.25...

  18. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and SCS Administrative Charge, specified in GRSP II.U.2. 5.4 Grandfathered Generation Management Service (GMS) Load Following Customers dedicating the entire output of an...

  19. Influence of river level on temperature and hydraulic gradients in chum and fall Chinook salmon spawning areas downstream of Bonneville Dam, Columbia River

    SciTech Connect (OSTI)

    Geist, David R.; Arntzen, Evan V.; Murray, Christopher J.; McGrath, Kathy; Bott, Yi-Ju; Hanrahan, Timothy P.

    2008-02-01

    Chum (Oncorhynchus keta) and fall Chinook (O. tshawytscha) salmon segregate spatially during spawning in the Ives Island side channel of the lower Columbia River downstream from Bonneville Dam. Previous research during one spawning season (2000) suggested that these species selected spawning habitats based on differences in hyporheic temperature and vertical hydraulic gradient (VHG) with the river. In this study, we confirmed the spatial segregation of spawning based on hyporheic characteristics over four years (2001–2004) and examined the effects of load-following operations (power generation to meet short-term electrical demand) at Bonneville Dam on hyporheic function and characteristics. We found that during the study period, hyporheic temperature and VHG in chum salmon spawning areas were highly variable during periods of load-following operation when river levels fluctuated. In contrast, hyporheic water temperature and VHG within chum spawning areas fluctuated less when river levels were not changing due to load-following operation. Variable temperature and VHG could affect chum and fall Chinook salmon spawning segregation and incubation success by altering the cues each species uses to select redd sites. Alterations in site selection would result in a breakdown in the spatial segregation of spawning between chum and fall Chinook salmon, which would expose earlier spawning fall Chinook eggs to a greater risk of dislodgement from later spawning chum salmon. Additional research will be required to fully assess the effects of load-following operations on the hyporheic environment and spawning and incubation success of chum and fall Chinook salmon downstream from Bonneville Dam.

  20. Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dams Second Powerhouse, Columbia River

    SciTech Connect (OSTI)

    Johnson, Gary E.; Ebberts, Blaine D.; Giorgi, Albert E.; Kuhn, Karen; Lee, Randall T.; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

    2008-01-01

    A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dams Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites Range D 122 m directly downstream from the existing sluice chute outfall and Range F 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists Adjustable Cantilever and Mid-Level Cantilever. The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at Bonneville Dam.

  1. EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona...

    Office of Environmental Management (EM)

    as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project...

  2. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  3. Bonneville Power Administration Appropriations Refinancing Act. Introduced in the Senate of the United States, One Hundred Fourth Congress, First Session, July 11, 1995

    SciTech Connect (OSTI)

    1995-12-31

    The report addresses S. 92 a bill to provide for the reconstitution of outstanding repayment obligations of the Administator of the Bonneville Power Administration (BPA) for the appropriated capital investment in the Federal Columbia River Power System. S. 92 also requires BPA to offer certain terms for all existing and future contracts for the sale of electric power and transmission. These terms would protect ratepayers from BPA`s setting rates in a manner that conflicts with certain repayment terms provided in the bill.

  4. SLAC Accelerator Test Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FACET & TF Careers & Education Archived FACET User Facility Quick Launch About FACET & Test Facilities Expand About FACET & Test Facilities FACET & Test Facilities User Portal...

  5. Clark County- Energy Conservation Code

    Broader source: Energy.gov [DOE]

    In September 2010, Clark County adopted Ordinance 3897, implementing the Southern Nevada version of the 2009 International Energy Conservation Code for both residential and commercial buildings...

  6. Broward County Online Solar Permitting

    Broader source: Energy.gov [DOE]

    Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that...

  7. Marin County- Solar Access Code

    Broader source: Energy.gov [DOE]

    Marin County's Energy Conservation Code is designed to assure new subdivisions provide for future passive or natural heating or cooling opportunities in the subdivision to the extent feasible. ...

  8. Environmental assessment: South microwave communication facilities

    SciTech Connect (OSTI)

    Not Available

    1989-06-01

    Western Area Power Administration (Western) is proposing to construct, operate, and maintain eight microwave repeater stations in southwestern Colorado, southeastern Utah, and northern Arizona, in order to meet the minimum fade criteria established by the Western Systems Coordinating Council (WSCC) for the operation and protection of electric power systems. The proposed microwave facilities would increase the reliability of communication. This environmental assessment (EA) describes the existing environmental conditions and the impacts from construction of the eight microwave communication facilities. The EA was prepared in compliance with the National Environmental Policy Act of 1969, the Council on Environmental Quality Regulations (40 CFR 1500-1508), and the Department of Energy Guidelines (52 FR 47662, December 15, 1987). The proposed project would consist of constructing eight microwave facilities, each of which would include a self-supported lattice tower, an equipment building, a propane tank, distribution lines to provide electric power to the sites, and access roads to the sites. The facilities would be constructed in San Miguel and Montezuma Counties in Colorado, San Juan County, Utah, and Navajo, Apache, Coconino, and Yavapai Counties in Arizona. 20 refs., 2 figs., 2 tabs.

  9. Winnebago County Landfill Gas Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    2.72.7 MW 2,700 kW 2,700,000 W 2,700,000,000 mW 0.0027 GW Commercial Online Date 2000 Heat Rate (BTUkWh) 9350.0 References EPA Web Site1 Loading map... "minzoom":false,"map...

  10. Atlantic County Util Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    1.521.52 MW 1,520 kW 1,520,000 W 1,520,000,000 mW 0.00152 GW Commercial Online Date 2005 Heat Rate (BTUkWh) 13648.0 References EPA Web Site1 Loading map......

  11. Dekalb County Landfi Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    3,040,000 W 3,040,000,000 mW 0.00304 GW Commercial Online Date 2006 Heat Rate (BTUkWh) 13648.0 References EPA Web Site1 Loading map... "minzoom":false,"mappingservice":"google...

  12. Adams County- Energy from Community Solar Gardens

    Broader source: Energy.gov [DOE]

    When SunShares solar garden comes online, Adams County will be the first county in the nation to power its buildings with community solar energy. The county projects energy cost savings of $300,...

  13. Sullivan County, Pennsylvania: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Sullivan County is a county in Pennsylvania. Its FIPS County Code is 113. It is classified as...

  14. Montgomery County, Mississippi: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Montgomery County is a county in Mississippi. Its FIPS County Code is 097. It is classified as...

  15. Montgomery County, Tennessee: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Montgomery County is a county in Tennessee. Its FIPS County Code is 125. It is classified as...

  16. Harrison County, Mississippi: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Harrison County is a county in Mississippi. Its FIPS County Code is 047. It is classified as...

  17. Los Angeles County, California | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County, California Los Angeles County, California Los Angeles County, California In order to make opportunities for home energy upgrades clear and consistent for the 10 million people living in Los Angeles County, the Los Angeles County Office of Sustainability decided to promote a single, regional residential efficiency program. The State of California had previously developed the statewide Energy Upgrade California program, which Los Angeles and other counties agreed to support through grant

  18. Nuclear Facilities

    Broader source: Energy.gov [DOE]

    The nuclear sites list and map shows how DOE nuclear operations are mostly divided between nuclear weapons stockpile maintenance, research and environmental cleanup. The operations are performed within several different facilities supporting nuclear reactor operations, nuclear research, weapons disassembly, maintenance and testing, hot cell operations, nuclear material storage and processing and waste disposal.

  19. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-04

    The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. Cancels DOE O 420.1B, DOE G 420.1-2 and DOE G 420.1-3.

  20. Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-10-13

    Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation. Cancels DOE 5480.7A, DOE 5480.24, DOE 5480.28 and Division 13 of DOE 6430.1A. Canceled by DOE O 420.1A.

  1. Williamson County School District (Tennessee) Bonds Case Study

    Broader source: Energy.gov [DOE]

    Williamson County School District entered into an energy savings performance contract with an energy services company and completed a $5.7 million lease-purchase agreement to fund a range of energy-related improvements across 27 school facilities. Case study is excerpted from Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements. Author: Merrian Borgeson and Mark Zimring

  2. Beam Test Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam Test Facility Beam Test Facility Print Tuesday, 20 October 2009 09:36 Coming Soon

  3. Metro Methane Recovery Facility Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Methane Recovery Facility Biomass Facility Jump to: navigation, search Name Metro Methane Recovery Facility Biomass Facility Facility Metro Methane Recovery Facility Sector Biomass...

  4. EA-1849-S-1: FONSI and Final Tuscarora Phase II Generating Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1849-S-1: FONSI and Final Tuscarora Phase II Generating Facility, Elko County, NV DOEEA1849S1FinalTuscaroraPhaseII.pdf (1.62 MB) DOEEA1849S1FONSITuscaroraPhaseII.pdf ...

  5. Yongshan County Yonggu Construction and Construction Material...

    Open Energy Info (EERE)

    Yongshan County Yonggu Construction and Construction Material Co Ltd Jump to: navigation, search Name: Yongshan County Yonggu Construction and Construction Material Co., Ltd....

  6. Williamson County, Tennessee: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    4 Climate Zone Subtype A. Registered Energy Companies in Williamson County, Tennessee Eco Energy Inc Places in Williamson County, Tennessee Brentwood, Tennessee Fairview,...

  7. Santa Barbara County, California Data Dashboard | Department...

    Broader source: Energy.gov (indexed) [DOE]

    The data dashboard for Santa Barbara County, California, a partner in the Better Buildings Neighborhood Program. Santa Barbara County Data Dashboard (299.97 KB) More Documents & ...

  8. Lushui County Quande Hydroelectrical Power Development Ltd |...

    Open Energy Info (EERE)

    County Quande Hydroelectrical Power Development Ltd Jump to: navigation, search Name: Lushui County Quande Hydroelectrical Power Development Ltd. Place: Yunnan Province, China...

  9. Los Angeles County Metropolitan Transportation Authority Metro...

    Open Energy Info (EERE)

    County Metropolitan Transportation Authority Metro Jump to: navigation, search Name: Los Angeles County Metropolitan Transportation Authority (Metro) Place: Los Angeles, California...

  10. Huitong County Gaoyongdong Hydropower Development | Open Energy...

    Open Energy Info (EERE)

    Huitong County Gaoyongdong Hydropower Development Jump to: navigation, search Name: Huitong County Gaoyongdong Hydropower Development Place: Huaihua city, Hunan Province, China...

  11. Linn County Rural Electric Cooperative - Agricultural Energy...

    Broader source: Energy.gov (indexed) [DOE]

    water heater installed, additional 25 bonus if electric dryer installed Energy Star Television: 50 Summary Linn County Rural Electric Cooperative Association (Linn County RECA)...

  12. Community Renewable Energy Deployment: Forest County Potawatomi...

    Open Energy Info (EERE)

    Forest County Potawatomi Tribe Jump to: navigation, search Name Community Renewable Energy Deployment: Forest County Potawatomi Tribe AgencyCompany Organization US Department of...

  13. Madison County- Wind Energy Systems Ordinance

    Office of Energy Efficiency and Renewable Energy (EERE)

    Madison County adopted a new land use ordinance in May 2010, which includes provisions for permitting wind turbines within the county.

  14. stergtland County, Sweden: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    stergtland County, Sweden: Energy Resources Jump to: navigation, search Name stergtland County, Sweden Equivalent URI DBpedia GeoNames ID 2685867 Coordinates 58.41667,...

  15. Vsternorrland County, Sweden: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Vsternorrland County, Sweden: Energy Resources Jump to: navigation, search Name Vsternorrland County, Sweden Equivalent URI DBpedia GeoNames ID 2664292 Coordinates 63, 17.5...

  16. Property:Building/County | Open Energy Information

    Open Energy Info (EERE)

    "BuildingCounty" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + Stockholm County, Sweden + Sweden Building 05K0002 + Stockholm...

  17. Sdermanland County, Sweden: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    dermanland County, Sweden: Energy Resources Jump to: navigation, search Name Sdermanland County, Sweden Equivalent URI DBpedia GeoNames ID 2676207 Coordinates 59.25,...

  18. Geomorphology and failure history of the earthquake-induced Farmington Siding landslide complex, Davis County, Utah

    SciTech Connect (OSTI)

    Lowe, M.; Harty, K.M. )

    1993-04-01

    The Farmington Siding landslide complex covers an area of 19.5 km[sup 2] in central Davis County. First identified and mapped in the 1970s, the feature was classified by previous researchers as a liquefaction-induced lateral spread based on surface geomorphology and exposures on the landslide complex. This was the first landslide in Utah to be attributed to earthquake-induced liquefaction. Geomorphic and geologic evidence indicate that the Farmington Sliding landslide complex likely consists of liquefaction-induced landslides that failed by means of both flow failure and lateral spreading. The landslide complex is located in an area underlain primarily by fine-grained deposits of Pleistocene Lake Bonneville and Holocene Great Salt Lake. Geomorphic features of the landslide complex include main and minor scarps, hummocks, closed depressions, and transverse lineaments. The main scarp consists mostly of a series of arcuate scallops near the left flank of the landslide, but it is a relatively linear, single scarp near the right flank of the landslide. Hummocks and closed depressions are most common near the head region of the landslide complex. Failure of the Farmington Sliding landslide complex has occurred at least twice. The older, distal portion of the landslide complex is cut by the Gilbert shoreline of the Bonneville lake cycle, indicating that landsliding occurred more than 10,000 years ago. In the younger portion of the landslide complex, landsliding has disrupted the Gilbert shoreline. Radiocarbon age estimates from trenches on a hummock near the main scarp of the younger landslide indicate that slope failure occurred sometime between about 2,730 [+-] 370 cal. yr B.P. and 4,530 [+-] 300 cal. yr B.P., possibly during the penultimate or antepenultimate surface-faulting earthquake on the Weber segment of the Wasatch fault zone.

  19. Kemper County IGCC (tm) Project Preliminary Public Design Report

    SciTech Connect (OSTI)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  20. EA-1907: Biogas Anaerobic Digester Facility, Oakley, Kansas

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of a proposal by DOE and USDA to provide funding to Western Plains Energy, LLC (WPE) to construct, purchase equipment, and operate a new Biogas Anaerobic Digester at WPE's existing Ethanol Facility, located at 3022 County Road 18, Grinnell Township (Oakley), Gove County, Kansas. The proposed facility will include a receiving building, digester, and related infrastructure. Based on the analysis in USDA's Final EA and FONSI, DOE has determined that DOE's proposed action does not constitute a major Federal action that would significantly affect the quality of the human or natural environment.