Powered by Deep Web Technologies
Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

STEO December 2012 - coal demand  

U.S. Energy Information Administration (EIA) Indexed Site

coal demand seen below 1 billion tons in 2012 for fourth year in a row Coal consumption by U.S. power plants to generate electricity is expected to fall below 1 billion tons in...

2

EIA projections of coal supply and demand  

SciTech Connect

Contents of this report include: EIA projections of coal supply and demand which covers forecasted coal supply and transportation, forecasted coal demand by consuming sector, and forecasted coal demand by the electric utility sector; and policy discussion.

Klein, D.E.

1989-10-23T23:59:59.000Z

3

Volatile coal prices reflect supply, demand uncertainties  

SciTech Connect

Coal mine owners and investors say that supply and demand are now finally in balance. But coal consumers find that both spot tonnage and new contract coal come at a much higher price.

Ryan, M.

2004-12-15T23:59:59.000Z

4

China's Coal: Demand, Constraints, and Externalities  

Science Conference Proceedings (OSTI)

This study analyzes China's coal industry by focusing on four related areas. First, data are reviewed to identify the major drivers of historical and future coal demand. Second, resource constraints and transport bottlenecks are analyzed to evaluate demand and growth scenarios. The third area assesses the physical requirements of substituting coal demand growth with other primary energy forms. Finally, the study examines the carbon- and environmental implications of China's past and future coal consumption. There are three sections that address these areas by identifying particular characteristics of China's coal industry, quantifying factors driving demand, and analyzing supply scenarios: (1) reviews the range of Chinese and international estimates of remaining coal reserves and resources as well as key characteristics of China's coal industry including historical production, resource requirements, and prices; (2) quantifies the largest drivers of coal usage to produce a bottom-up reference projection of 2025 coal demand; and (3) analyzes coal supply constraints, substitution options, and environmental externalities. Finally, the last section presents conclusions on the role of coal in China's ongoing energy and economic development. China has been, is, and will continue to be a coal-powered economy. In 2007 Chinese coal production contained more energy than total Middle Eastern oil production. The rapid growth of coal demand after 2001 created supply strains and bottlenecks that raise questions about sustainability. Urbanization, heavy industrial growth, and increasing per-capita income are the primary interrelated drivers of rising coal usage. In 2007, the power sector, iron and steel, and cement production accounted for 66% of coal consumption. Power generation is becoming more efficient, but even extensive roll-out of the highest efficiency units would save only 14% of projected 2025 coal demand for the power sector. A new wedge of future coal consumption is likely to come from the burgeoning coal-liquefaction and chemicals industries. If coal to chemicals capacity reaches 70 million tonnes and coal-to-liquids capacity reaches 60 million tonnes, coal feedstock requirements would add an additional 450 million tonnes by 2025. Even with more efficient growth among these drivers, China's annual coal demand is expected to reach 3.9 to 4.3 billion tonnes by 2025. Central government support for nuclear and renewable energy has not reversed China's growing dependence on coal for primary energy. Substitution is a matter of scale: offsetting one year of recent coal demand growth of 200 million tonnes would require 107 billion cubic meters of natural gas (compared to 2007 growth of 13 BCM), 48 GW of nuclear (compared to 2007 growth of 2 GW), or 86 GW of hydropower capacity (compared to 2007 growth of 16 GW). Ongoing dependence on coal reduces China's ability to mitigate carbon dioxide emissions growth. If coal demand remains on a high growth path, carbon dioxide emissions from coal combustion alone would exceed total US energy-related carbon emissions by 2010. Within China's coal-dominated energy system, domestic transportation has emerged as the largest bottleneck for coal industry growth and is likely to remain a constraint to further expansion. China has a low proportion of high-quality reserves, but is producing its best coal first. Declining quality will further strain production and transport capacity. Furthermore, transporting coal to users has overloaded the train system and dramatically increased truck use, raising transportation oil demand. Growing international imports have helped to offset domestic transport bottlenecks. In the long term, import demand is likely to exceed 200 million tonnes by 2025, significantly impacting regional markets.

Aden, Nathaniel; Fridley, David; Zheng, Nina

2009-07-01T23:59:59.000Z

5

U.S. Coal Supply and Demand  

Gasoline and Diesel Fuel Update (EIA)

U.S. Coal Supply and Demand > U.S. Coal Supply and Demand U.S. Coal Supply and Demand > U.S. Coal Supply and Demand U.S. Coal Supply and Demand 2010 Review (entire report also available in printer-friendly format ) Previous Editions 2009 Review 2008 Review 2007 Review 2006 Review 2005 Review 2004 Review 2003 Review 2002 Review 2001 Review 2000 Review 1999 Review Data for: 2010 Released: May 2011 Next Release Date: April 2012 Table 3. Electric Power Sector Net Generation, 2009-2010 (Million Kilowatthours) New England Coal 14,378 14,244 -0.9 Hydroelectric 7,759 6,861 -11.6 Natural Gas 48,007 54,680 13.9 Nuclear 36,231 38,361 5.9 Other (1) 9,186 9,063 -1.3 Total 115,559 123,210 6.6 Middle Atlantic Coal 121,873 129,935 6.6 Hydroelectric 28,793 26,463 -8.1 Natural Gas 89,808 104,341 16.2 Nuclear 155,140 152,469 -1.7

6

Rising Asian demand drives global coal consumption growth ...  

U.S. Energy Information Administration (EIA)

Global coal demand has almost doubled since 1980, driven by increases in Asia, where demand is up over 400% from 1980-2010. In turn, Asian demand is ...

7

A demand-responsive decision support system for coal transportation  

Science Conference Proceedings (OSTI)

In this paper, a demand-responsive decision support system is proposed by integrating the operations of coal shipment, coal stockpiles and coal railing within a whole system. A generic and flexible scheduling optimisation methodology is developed to ... Keywords: Coal shipment, Coal stockpiles, Coal train scheduling, Decision support system, Mine transportation

Erhan Kozan; Shi Qiang Liu

2012-12-01T23:59:59.000Z

8

U.S. Coal Supply and Demand: 2001 Review  

Gasoline and Diesel Fuel Update (EIA)

U.S. Coal Supply and Demand: 2001 Review U.S. Coal Supply and Demand: 2001 Review 1 U.S. Coal Supply and Demand: 2001 Review (Revised 5/6/2002) 1 by Fred Freme U.S. Energy Information Administration 1 This article has been revised, deleting 17.6 millions short tons of coal consumed by the manufacturers of synthetic coal from the consumption of coal by "other industrial plants." This change was made because the synthetic coal those plants produced was primarily consumed in the electric sector and reported as coal, resulting in an overstating of total coal consumption. Overview With the dawning of a new century came the beginning of a new era in the coal industry. Instead of the traditional prac- tice of only buying and selling produced coal in the United

9

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

of deploying advanced coal power in the Chinese context,”12 2.6. International coal prices and12 III. Chinese Coal

Aden, Nathaniel

2010-01-01T23:59:59.000Z

10

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

12 2.6. International coal prices and18 International coal prices and trade In parallel with thesocial stability. High coal prices and domestic shortages

Aden, Nathaniel

2010-01-01T23:59:59.000Z

11

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

world’s largest CBM (coal-bed methane) power plant. In orderunder the China United Coal-bed Methane Corporation (CUCBM)quandary. 3.3.4. Coal-bed and coal-mine methane Effective

Aden, Nathaniel

2010-01-01T23:59:59.000Z

12

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

face of oil and natural gas price rises, coal’s share may becoal consumption declined from 1996 to 2006, but rebounded in 2006; unless residential natural gas prices

Aden, Nathaniel

2010-01-01T23:59:59.000Z

13

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

40 Executive Summary China has been, is, and will continueMLR, cited in IEA. 2009. Cleaner Coal in China. Paris: IEA.UBS Investment Research: China Coal Sector. (17 January

Aden, Nathaniel

2010-01-01T23:59:59.000Z

14

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

Historical and Hypothetical Efficiency of China's Coal-Fired Electricity Generation, 1990-2025 Gross Heat Rate (

Aden, Nathaniel

2010-01-01T23:59:59.000Z

15

Coal in transition 1980--2000 demand considerations  

DOE Green Energy (OSTI)

The usefulness of the Brookhaven model, TESOM, lies in its exploration of the demand side of the energy system. Sectors where coal may be substituted for other energy forms are identified, and attractive technologies are highlighted. The results of the runs accord well with intuitive expectations. The increasing prices of oil and natural gas usually imply that (a) coal synthetics become increasingly attractive technologies, except in the High Demand and CRUNCH Cases (b) nuclear and hydro-electric generation are preferred technologies, (c) coal steam electric, even with expensive scrubbers, becomes more attractive than oil or gas steam electric by year 1990, (d) fluidized bed combustion for electricity generation is cost effective (with relatively small environmental impacts) when compared to oil, gas and coal steam electric. FBC process steam exhibits similar behavior. In the High Demand and CRUNCH scenarios, technologies such as solar electric, which are usually not chosen on the basis of cost, enter the solution because meeting demands has become extremely difficult. As the allowed coal expansion rate becomes a limiting factor, coal synthetics manufacturing becomes an unattractive alternative. This is due both to the need for coal electric generation to meet high electricity demand levels, and to the inefficiencies in the manufacturing process. Due to preferred allocation of coal to electricity generation or synthetics, direct coal use is reduced, although this is normally a preferred option.

Kydes, A S; Cherniavsky, E A

1977-12-01T23:59:59.000Z

16

U.S. Coal Supply and Demand: 1997 Review  

Gasoline and Diesel Fuel Update (EIA)

Western Western Interior Appalachian Energy Information Administration/ U.S. Coal Supply and Demand: 1997 Review 1 Figure 1. Coal-Producing Regions Source: Energy Information Administration, Coal Industry Annual 1996, DOE/EIA-0584(96) (Washington, DC, November 1997). U.S. Coal Supply and Demand: 1997 Review by B.D. Hong Energy Information Administration U.S. Department of Energy Overview U.S. coal production totaled a record high of 1,088.6 million short tons in 1997, up by 2.3 percent over the 1996 production level, according to preliminary data from the Energy Information Administration (Table 1). The electric power industry (utilities and independent power producers)-the dominant coal consumer-used a record 922.0 million short tons, up by 2.8 percent over 1996. The increase in coal use for

17

China's Coal: Demand, Constraints, and Externalities  

E-Print Network (OSTI)

delivered heating (district heating) (6%), and chemicalscoal growth. As district heating expands with urbanizationzone, coal use for district heating will depend on the

Aden, Nathaniel

2010-01-01T23:59:59.000Z

18

U.S. Coal Supply and Demand: 2003 Review  

Gasoline and Diesel Fuel Update (EIA)

3 Review 3 Review 1 U.S. Coal Supply and Demand: 2003 Review by Fred Freme U.S. Energy Information Administration Overview U.S. coal production fell for the second year in a row in 2003, declining by 24.8 million short tons to end the year at 1,069.5 million short tons according to preliminary data from the Energy Information Administration (Table 1), down 2.3 percent from the 2002 level of 1,094.3 million short tons. (Note: All percentage change calculations are done at the short ton level.) Total U.S. coal consumption rose in 2003, with all coal-consuming sectors increasing or remaining stable for the year. Coal consumption in the electric power sector increased by 2.4 percent. However, there were only slight gains in consumption by the other sectors. U.S. coal exports rose in 2003 for the first time in

19

Primary coal crushers grow to meet demand  

Science Conference Proceedings (OSTI)

Mine operators look for more throughput with less fines generation in primary crushers (defined here as single role crushers and two stage crushers). The article gives advice on crusher selection and application. Some factors dictating selection include the desired product size, capacity, Hard Grove grindability index, percentage of rock to be freed and hardness of that rock. The hardness of coal probably has greatest impact on product fineness. 2 refs., 1 fig., 1 tab.

Fiscor, S.

2009-09-15T23:59:59.000Z

20

U.S. Coal Supply and Demand: 2006 Review  

Reports and Publications (EIA)

This article provides and overview of the year 2006 in the coal industry and covers coal production, consumption, exports, imports, stocks, and delivered coal prices. It provides a detailed regional and State level coal production and national coal consumption along with industry developments that occurred in 2006. A brief discussion of coal-synfuel plants is included

Fred Freme

2007-04-17T23:59:59.000Z

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

U.S. Coal Supply and Demand: 2007 Review  

Reports and Publications (EIA)

This article provides and overview of the year 2007 in the coal industry and covers coal production, consumption, exports, imports, stocks, and delivered coal prices. It provides a detailed regional and State level coal production and national coal consumption along with industry developments that occurred in 2007. A brief discussion of coal-synfuel plants is included

Fred Freme

2008-04-16T23:59:59.000Z

22

Data:076f7b57-3f48-4607-a7f7-b18f7b7a1144 | Open Energy Information  

Open Energy Info (EERE)

-3f48-4607-a7f7-b18f7b7a1144 -3f48-4607-a7f7-b18f7b7a1144 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2012/05/01 End date if known: Rate name: RESIDENTIAL SERVICE - ENERGY EFFICIENT SINGLE PHASE(EE-1) Sector: Residential Description: AVAILABILITY: This Schedule is available in all territory served by the Cooperative subject to the Cooperative's established Service Rules and Regulations and applicability stated herein. APPLICABILITY: This Schedule is applicable to individual residential consumers in residences, mobile homes, or individually metered apartments who meet all-electric and thermal requirements of this Schedule.

23

U.S. Coal Supply and Demand: 2010 Year in Review - Energy Information  

Gasoline and Diesel Fuel Update (EIA)

U.S. Coal Supply and Demand: 2010 Year in Review U.S. Coal Supply and Demand: 2010 Year in Review Release Date: June 1, 2011 | Next Release Date: Periodically | full report Introduction Coal production in the United States in 2010 increased to a level of 1,085.3 million short tons according to preliminary data from the U.S. Energy Information Administration (EIA), an increase of 1.0 percent, or 10.4 million short tons above the 2009 level of 1,074.9 million short tons (Table 1). In 2010 U.S. coal consumption increased in all sectors except commercial and institutional while total coal stocks fell slightly for the year. Coal consumption in the electric power sector in 2010 was higher by 4.5 percent, while coking coal consumption increased by 37.9 percent and the other industrial sector increased by 7.1 percent. The commercial and

24

New coal plant technologies will demand more water  

Science Conference Proceedings (OSTI)

Population shifts, growing electricity demand, and greater competition for water resources have heightened interest in the link between energy and water. The US Energy Information Administration projects a 22% increase in US installed generating capacity by 2030. Of the 259 GE of new capacity expected to have come on-line by then, more than 192 GW will be thermoelectric and thus require some water for cooling. Our challenge will become balancing people's needs for power and for water. 1 ref., 7 figs.

Peltier, R.; Shuster, E.; McNemar, A.; Stiegel, G.J.; Murphy, J.

2008-04-15T23:59:59.000Z

25

AOCS Official Method F 7-44  

Science Conference Proceedings (OSTI)

Total Alkalinity AOCS Official Method F 7-44 Methods Methods and Analyses Analytical Chemistry Methods Downloads Methods Downloads DEFINITION This method determines the total alkalinity of the fixed alkali, amm

26

Data:645931df-10dd-42fc-9bd5-6f29c850f7f7 | Open Energy Information  

Open Energy Info (EERE)

df-10dd-42fc-9bd5-6f29c850f7f7 df-10dd-42fc-9bd5-6f29c850f7f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elk Point, South Dakota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Large Power Rate Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1

27

Data:B2c9a2f7-a773-4081-97f7-40e3762dae42 | Open Energy Information  

Open Energy Info (EERE)

c9a2f7-a773-4081-97f7-40e3762dae42 c9a2f7-a773-4081-97f7-40e3762dae42 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wilson, North Carolina (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Seasonal or Intermittent Services Rate (SGS-90) Single Phase - Off-season with renew Rider-02 Sector: Industrial Description: "This schedule is available for a non-residential seasonal customer at a single point of delivery, at one of the City's standard voltages, and whose operation is normally seasonal or varies greatly from month to month; whose actual kW demand for at least two consecutive months is less than 30% of the greater of the contract demand or maximum demand registered in the preceding 12 months; and whose contract demand or registered or coputed demand is less than 1,200 kW. This schedule is not available for short-term, construction, temporary, breakdown, standby or supplementary service, or for contract demands or loads of less than 30 kW or greater than 1,200 kW."

28

Data:Ddcf7e90-c0f7-4bc2-8f7e-a784dbff4199 | Open Energy Information  

Open Energy Info (EERE)

Ddcf7e90-c0f7-4bc2-8f7e-a784dbff4199 Ddcf7e90-c0f7-4bc2-8f7e-a784dbff4199 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Winfield, Kansas (Utility Company) Effective date: 2012/11/01 End date if known: Rate name: Rate schedule LIS 4(100), nonjurisdictional large industrial interruptible demand rate service V2 Sector: Industrial Description: Source or reference: http://www.winfieldks.org/index.aspx?NID=201 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

29

Data:A7edb1df-6f7d-47f7-8732-07c89123d023 | Open Energy Information  

Open Energy Info (EERE)

edb1df-6f7d-47f7-8732-07c89123d023 edb1df-6f7d-47f7-8732-07c89123d023 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: This rate schedule is optional to all Gs-1, General Service customers. This rate will be available to both single-phase and three-phase customers including commercial, institutional, government and other Gs-1 customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

30

Data:18542904-de7f-4833-9d61-b6f7e88c3f7f | Open Energy Information  

Open Energy Info (EERE)

de7f-4833-9d61-b6f7e88c3f7f de7f-4833-9d61-b6f7e88c3f7f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: LP2 Large Power Service - Transmission Lines Sector: Industrial Description: 1.1 This Rate Schedule LP-2 is offered for the entire electrical requirements at a single location of any industrial or manufacturing Customer requiring 5,000 kVa or more of installed transformer capacity, and for which there exists an executed power Purchase Contract between the Customer and the District. Resale of energy taken under this rate schedule by the Customer is not permitted.

31

Data:B058b52f-7f7f-41e7-9758-b753db0882f9 | Open Energy Information  

Open Energy Info (EERE)

2f-7f7f-41e7-9758-b753db0882f9 2f-7f7f-41e7-9758-b753db0882f9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kankakee Valley Rural E M C Effective date: 2012/05/01 End date if known: Rate name: Rate Schedule ATOU: Residential Time Of Use Sector: Residential Description: AVAILABILITY: This schedule is available to any member of the REMC located within the territory served by Kankakee Valley Rural Electric Membership Corporation that utilizes power on a year-round basis. Customers that use power less than nine months out of the year are served under rate schedules SP, SR, CSP, or SPTOU. APPLICATION: This schedule is applicable to all electric service used exclusively for domestic purposes to individually metered single-family dwelling units and to individually metered dwelling units in duplexes, apartments, and condominiums. CHARACTER OF SERVICE: Service under this schedule shall be single phase, 60 Hertz, alternating current at the REMC's available standard voltages. All residential service required on the premises by the customer will be supplied through one meter. Standby, or resale service, is not permitted hereunder.

32

Coal investment and long-term supply and demand outlook for coal in the Asia-Pacific Region  

SciTech Connect

The theme of this symposium to look ahead almost a quarter century to 2020 gives one the freedom to speculate more than usual in projections for coal. It is important to attempt to take a long term look into the future of coal and energy, so that one can begin to prepare for major changes on the horizon. However, it would be a mistake to believe that the crystal ball for making long term projections is accurate for 2020. Hopefully it can suggest plausible changes that have long term strategic importance to Asia`s coal sector. This paper presents the medium scenario of long term projects of coal production, consumption, imports and exports in Asia. The second part of the paper examines the two major changes in Asia that could be most important to the long term role of coal. These include: (1) the impact of strict environmental legislation on energy and technology choices in Asia, and (2) the increased role of the private sector in all aspects of coal in Asia.

Johnson, C.J.

1997-12-31T23:59:59.000Z

33

Coal supply/demand, 1980 to 2000. Task 3. Resource applications industrialization system data base. Final review draft. [USA; forecasting 1980 to 2000; sector and regional analysis  

SciTech Connect

This report is a compilation of data and forecasts resulting from an analysis of the coal market and the factors influencing supply and demand. The analyses performed for the forecasts were made on an end-use-sector basis. The sectors analyzed are electric utility, industry demand for steam coal, industry demand for metallurgical coal, residential/commercial, coal demand for synfuel production, and exports. The purpose is to provide coal production and consumption forecasts that can be used to perform detailed, railroad company-specific coal transportation analyses. To make the data applicable for the subsequent transportation analyses, the forecasts have been made for each end-use sector on a regional basis. The supply regions are: Appalachia, East Interior, West Interior and Gulf, Northern Great Plains, and Mountain. The demand regions are the same as the nine Census Bureau regions. Coal production and consumption in the United States are projected to increase dramatically in the next 20 years due to increasing requirements for energy and the unavailability of other sources of energy to supply a substantial portion of this increase. Coal comprises 85 percent of the US recoverable fossil energy reserves and could be mined to supply the increasing energy demands of the US. The NTPSC study found that the additional traffic demands by 1985 may be met by the railways by the way of improved signalization, shorter block sections, centralized traffic control, and other modernization methods without providing for heavy line capacity works. But by 2000 the incremental traffic on some of the major corridors was projected to increase very significantly and is likely to call for special line capacity works involving heavy investment.

Fournier, W.M.; Hasson, V.

1980-10-10T23:59:59.000Z

34

Tight Labor Markets and the Demand for Education: Evidence from the Coal Boom and Bust  

E-Print Network (OSTI)

Human capital theory predicts that individuals acquire less schooling when the returns to schooling are small. To test this theory, we study the effect of the coal boom in Appalachia on high school enrollments. During the 1970s, a boom in the coal industry increased the earnings of high school dropouts relative to graduates. During the 1980s, the boom subsided and the earnings of high school dropouts declined relative to graduates. We find that high school enrollment rates in Kentucky and Pennsylvania declined considerably in the 1970s and increased A simple model of human capital predicts that increases in the wages of workers with low education relative to workers with high education will reduce investments in schooling because the returns to additional years of schooling are diminished. In this paper, we exploit a particularly unique opportunity to study the effect of a decrease in the wage gap between high

Dan A. Black; Terra G. Mckinnish; Seth G. Sanders

2005-01-01T23:59:59.000Z

35

Data:44f7ae72-a8e6-40cc-9f7b-305427e012ab | Open Energy Information  

Open Energy Info (EERE)

ae72-a8e6-40cc-9f7b-305427e012ab ae72-a8e6-40cc-9f7b-305427e012ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: Area Lighting - 175 W Mercury Vapor-Customer Leased Sector: Lighting Description: To any customer who contracts for lighting of outdoor areas not provided for by the District's Street Lighting Schedules. Service shall be provided from dusk until dawn or approximately 4,000 hours per annum. The customer may lease the area lighting equipment to be installed on existing structures at a flat monthly charge which shall cover the equipment, installation, and maintenance only. The current shall be metered and paid for by the customer, along with other electrical use. Monthly charge for lease of equipment, installation, and maintenance.

36

Data:D05478f7-e342-4663-89ce-565224efa0c2 | Open Energy Information  

Open Energy Info (EERE)

f7-e342-4663-89ce-565224efa0c2 f7-e342-4663-89ce-565224efa0c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2011/06/01 End date if known: Rate name: Schedule A - Farm and Home Service Sector: Residential Description: Applicable to residential consumers subject to the established rules and regulations of the Seller. The capacity of individual meters served under this schedule shall not exceed 7.5 H.P. Not applicable to loads having demands greater than 50 KW. Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

37

Data:728dd673-63f7-4836-86b5-9499adad5931 | Open Energy Information  

Open Energy Info (EERE)

dd673-63f7-4836-86b5-9499adad5931 dd673-63f7-4836-86b5-9499adad5931 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Chattanooga, Tennessee (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: SGSC- Seasonal Very Large Commercial Sector: Commercial Description: This rate shall apply to the firm electric power requirements where a customer's currently effective contract demand is greater than 15,000 kW but not more than 25,000 kW. Source or reference: https://www.epb.net/power/business/services/business-electrical-rates/ Source Parent: Comments Applicability Demand (kW)

38

Coal....  

U.S. Energy Information Administration (EIA)

DOE EIA WEEKLY COAL ... Coal Prices and Earnings (updated April 28, 2004) Spot coal prices in the East rose steadily since Labor Day 2003, with rapid escalations ...

39

Coal....  

U.S. Energy Information Administration (EIA)

DOE EIA WEEKLY COAL ... Coal Prices and Earnings (updated September 26) The average spot prices for reported coal purchases rose once again ...

40

Coal....  

U.S. Energy Information Administration (EIA)

Coal Prices and Earnings (updated August 12) According to Platts Coal Outlook’s Weekly Price Survey (August 11), the ...

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Coal....  

U.S. Energy Information Administration (EIA)

Coal Prices and Earnings (updated September 2) The average spot prices for coal traded last week were relatively ...

42

Data:751c4f7b-5378-47ec-b3cf-559976240833 | Open Energy Information  

Open Energy Info (EERE)

f7b-5378-47ec-b3cf-559976240833 f7b-5378-47ec-b3cf-559976240833 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights - 1000 Watt MH Flood Vapor - Metered Sector: Lighting Description: Wood Pole Charge - $2.00 Fiberglass Pole - $10.00/fixture for 60 months Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

43

Data:2271071d-2d5a-49f7-beed-9609e88bd9eb | Open Energy Information  

Open Energy Info (EERE)

d-2d5a-49f7-beed-9609e88bd9eb d-2d5a-49f7-beed-9609e88bd9eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Schedule L - 400W HPS Flood Sector: Commercial Description: Source or reference: http://www.nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

44

Data:0d045157-3944-4f7a-9c12-f4145621a734 | Open Energy Information  

Open Energy Info (EERE)

45157-3944-4f7a-9c12-f4145621a734 45157-3944-4f7a-9c12-f4145621a734 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navajo Tribal Utility Authority Effective date: 2002/12/05 End date if known: Rate name: 8 module photvoltaic Sector: Residential Description: Source or reference: http://www.ntua.com/utility_rates/pvrates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

45

Data:2616ab40-25f7-4016-b290-bab574a29ddb | Open Energy Information  

Open Energy Info (EERE)

-25f7-4016-b290-bab574a29ddb -25f7-4016-b290-bab574a29ddb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Amherst, Ohio (Utility Company) Effective date: End date if known: Rate name: Residential Rate Sector: Residential Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

46

Data:150d812f-7ddc-4789-92f4-781fa618927c | Open Energy Information  

Open Energy Info (EERE)

f-7ddc-4789-92f4-781fa618927c f-7ddc-4789-92f4-781fa618927c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Merrimac, Massachusetts (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: RATE F- SMALL COMMERCIAL Sector: Commercial Description: Additional Info: Availability: For any customer with a demand less than 10 kW. If electricity is delivered under this schedule through more than one meter, the cost of service shall be computed separately for the electricity delivered through each meter, unless such multiple metering is for the Department's convenience.

47

Data:C0f419f7-7001-4550-899b-abaec32daccd | Open Energy Information  

Open Energy Info (EERE)

f7-7001-4550-899b-abaec32daccd f7-7001-4550-899b-abaec32daccd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Midwest Energy Inc Effective date: 2012/06/29 End date if known: Rate name: LAL- HPS 200 Watt 85 kWh (Wood Pole)- Unmetered Sector: Lighting Description: Source or reference: http://www.mwenergy.com/elecrate.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

48

Data:3330d2f7-bda2-415d-9021-5225e2521999 | Open Energy Information  

Open Energy Info (EERE)

30d2f7-bda2-415d-9021-5225e2521999 30d2f7-bda2-415d-9021-5225e2521999 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Street Lighting - Ms-1 - City Owned Lights 250 W HPS Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will install and maintain street lighting units. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=550 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

49

Data:D38c71f7-91f7-4e7b-bec6-8d130e48a300 | Open Energy Information  

Open Energy Info (EERE)

c71f7-91f7-4e7b-bec6-8d130e48a300 c71f7-91f7-4e7b-bec6-8d130e48a300 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (HPS 1,000) Sector: Commercial Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

50

Data:E5175eb4-3f7f-42db-a8e1-7eba5e5f7f09 | Open Energy Information  

Open Energy Info (EERE)

eb4-3f7f-42db-a8e1-7eba5e5f7f09 eb4-3f7f-42db-a8e1-7eba5e5f7f09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Winfield, Kansas (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Electric rate schedule LIS-4(102, 103), nonjurisdictional electric prepurchase option large general service V2 Sector: Industrial Description: Source or reference: http://www.winfieldks.org/index.aspx?NID=201 Source Parent: Comments Energy charge: 1.The charge for all prepurchased energy is to be set monthly by the city manager. 2.Fixed transmission and distribution adder: $0.0091 per kwh ($9.10 per mwh) added to each unit of energy sold under this option.

51

Coal....  

U.S. Energy Information Administration (EIA)

DOE EIA WEEKLY COAL ... Coal Prices and Earnings (updated July 7, 2004) In the trading week ended July 2, the average spot coal prices tracked by EIA were mixed.

52

Data:58e9bf62-453e-4258-8464-83adc85341f7 | Open Energy Information  

Open Energy Info (EERE)

2-453e-4258-8464-83adc85341f7 2-453e-4258-8464-83adc85341f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Pend Oreille Cnty Effective date: 2011/07/01 End date if known: Rate name: Street Lighting 100w Sodium Vapor Sector: Lighting Description: Available to towns, by contractual arrangement. Revisions of this rate schedule shall apply to existing contracts as of the effective date of the change. Base rates shall apply to standard luminar refractor-type fixtures, installed on existing poles. Where deluxe-type fixtures, or metal poles or special wood poles are desired, an additional charge may be made to amortize the additional cost.

53

Data:1ff143fb-92f7-4639-b337-67d027720178 | Open Energy Information  

Open Energy Info (EERE)

43fb-92f7-4639-b337-67d027720178 43fb-92f7-4639-b337-67d027720178 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2012/05/31 End date if known: Rate name: Button-Up Weatherization Program Sector: Commercial Description: The Button-Up Weatherization Program offers an incentive for reducing the heat loss of a home. The retail member of Taylor County Rural Electric Cooperative Corporation may qualify for this incentive by improving insulation, installing higher efficiency windows and doors, or by reducing the air leakage of their home. This program is available to residential members in all service territory served by Taylor County Rural Electric Cooperative Corporation.

54

Data:9cfe58f7-ad60-4539-8206-ebad6d6029ff | Open Energy Information  

Open Energy Info (EERE)

cfe58f7-ad60-4539-8206-ebad6d6029ff cfe58f7-ad60-4539-8206-ebad6d6029ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Area Lighting-High Pressure Sodium-1,000 watts-Outside Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

55

Data:12ac0693-2912-44f7-8606-5d19371ede4d | Open Energy Information  

Open Energy Info (EERE)

693-2912-44f7-8606-5d19371ede4d 693-2912-44f7-8606-5d19371ede4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

56

Data:1373f291-f0ee-45f7-8abb-710bcedb969b | Open Energy Information  

Open Energy Info (EERE)

f0ee-45f7-8abb-710bcedb969b f0ee-45f7-8abb-710bcedb969b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 1999/05/01 End date if known: Rate name: 250W Type -'HPS-Flood', kWh-100 Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Corporation's specifications. Service will be rendered only at locations that, solely in the opinion of the Corporation, are readily accessible for installation and maintenance. Source or reference: ISU Documentation

57

Data:8b3dd841-12f7-45e0-beca-4ea9adfeefd3 | Open Energy Information  

Open Energy Info (EERE)

8b3dd841-12f7-45e0-beca-4ea9adfeefd3 8b3dd841-12f7-45e0-beca-4ea9adfeefd3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sand Mountain Electric Coop Effective date: 2013/05/01 End date if known: Rate name: Schedule MSC - Manufacturing Service Sector: Industrial Description: Demand Charge: $8.84/kW over contract demand. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

58

Data:C01949c5-0d65-4cfc-908d-46f7a289729a | Open Energy Information  

Open Energy Info (EERE)

c5-0d65-4cfc-908d-46f7a289729a c5-0d65-4cfc-908d-46f7a289729a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Interruptible Power - Discretionary(Subtransmission voltage)-supplemental interruptions -Demand charge Sector: Industrial Description: Tiered demand charge Source or reference: https://www.aepohio.com/global/utilities/lib/docs/ratesandtariffs/Ohio/2012-04-05_CSP_OP_StandardTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

59

China, India demand cushions prices  

SciTech Connect

Despite the hopes of coal consumers, coal prices did not plummet in 2006 as demand stayed firm. China and India's growing economies, coupled with solid supply-demand fundamentals in North America and Europe, and highly volatile prices for alternatives are likely to keep physical coal prices from wide swings in the coming year.

Boyle, M.

2006-11-15T23:59:59.000Z

60

Data:8ad49644-8f7f-41e8-ad58-795db98e6494 | Open Energy Information  

Open Energy Info (EERE)

4-8f7f-41e8-ad58-795db98e6494 4-8f7f-41e8-ad58-795db98e6494 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: LPL-TOU Large Power & Light Time-of-Use(demand charge) Sector: Lighting Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:D6816a84-74ea-4535-b8f7-711be7a587bc | Open Energy Information  

Open Energy Info (EERE)

-74ea-4535-b8f7-711be7a587bc -74ea-4535-b8f7-711be7a587bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-3 and BGS-3 Zone 1 - General Delivery Service 15kV to 100kV Sector: Industrial Description: Availability: Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that has demand metering installed and a maximum monthly Demand equal to or greater than 150 kilowatts (kW) but less than 1,000 kW as qualified in the Delivery Service Rate Reassignment section.

62

Data:D2763d55-45e8-454f-8710-bdc413f584f7 | Open Energy Information  

Open Energy Info (EERE)

63d55-45e8-454f-8710-bdc413f584f7 63d55-45e8-454f-8710-bdc413f584f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Troy, Indiana (Utility Company) Effective date: End date if known: Rate name: Schedule C: Large Industrial Sector: Industrial Description: Available to any customer served by the utility for power and incidental lighting service and having a billing demand of 50 KVA or greater. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

63

Data:9ee663ec-1aea-48f7-b46e-0bd579f6f55b | Open Energy Information  

Open Energy Info (EERE)

ec-1aea-48f7-b46e-0bd579f6f55b ec-1aea-48f7-b46e-0bd579f6f55b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Small Industrial General Service Multi-Phase Sector: Industrial Description: Applicable:To commercial, industrial, public buildings and other services not eligible under other rate rate schedules where measured demand is less than 50 kW at all times. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/8/ Source Parent: Comments Applicability Demand (kW)

64

Data:0996d01b-e2f7-4eaa-a99b-5f0939049fed | Open Energy Information  

Open Energy Info (EERE)

6d01b-e2f7-4eaa-a99b-5f0939049fed 6d01b-e2f7-4eaa-a99b-5f0939049fed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bristol, Tennessee (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: General Service- A3 Sector: Commercial Description: If (a) the higher of the customer's current effective contract demand, if any, or (b) its highest billing demand during the latest 12-month period is greater than 1,000 kW Source or reference: http://www.btes.net/index.php/electric/general-electric-rates-old/general-service-a-rate-schedule-gsa/ Source Parent: Comments Applicability

65

Data:58d87638-1c49-486d-9f7f-b4fe230db159 | Open Energy Information  

Open Energy Info (EERE)

638-1c49-486d-9f7f-b4fe230db159 638-1c49-486d-9f7f-b4fe230db159 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cartersville, Georgia (Utility Company) Effective date: 2005/10/18 End date if known: Rate name: Small Power Service, SP-2 (Industrial) Sector: Industrial Description: Applicable to all commercial or industrial electric service which is delivered or compensated to one energy standard voltage and where the following criteria are met: 1.Billing demand for the current month and the preceding 11 months must be less than or equal to 100 KW as defined in the billing demand section of this tariff.

66

Data:8be02876-f901-49f7-93cc-48cb12cc0db2 | Open Energy Information  

Open Energy Info (EERE)

2876-f901-49f7-93cc-48cb12cc0db2 2876-f901-49f7-93cc-48cb12cc0db2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Greenfield, Indiana (Utility Company) Effective date: End date if known: Rate name: DELETE Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

67

Coal News and Markets  

U.S. Energy Information Administration (EIA)

Metallurgical coal markets became volatile when the thriving Chinese steel industry in late 2003 and 2004 made outsized demands for coking coal and met coke, ...

68

1995 Demand-Side Managment  

U.S. Energy Information Administration (EIA)

U.S. Electric Utility Demand-Side Management 1995 January 1997 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels

69

Data:E5729aab-8853-46ee-9886-554f7d923c7c | Open Energy Information  

Open Energy Info (EERE)

E5729aab-8853-46ee-9886-554f7d923c7c E5729aab-8853-46ee-9886-554f7d923c7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Morganton, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Electric Rate Schedule I Sector: Commercial Description: Minimum demand of 30 kW Demand Charges: Summer Demand Charge: $20.00/kW Summer Excess Demand: $5.00/kW Non-Summer Demand Charge: $10.50/kW Non-Summer Excess Demand: $8.00/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/212/Morganton%20NC.pdf

70

Data:C320006a-3f4c-44eb-8ae3-a6772f7aeb2d | Open Energy Information  

Open Energy Info (EERE)

20006a-3f4c-44eb-8ae3-a6772f7aeb2d 20006a-3f4c-44eb-8ae3-a6772f7aeb2d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2012/01/01 End date if known: Rate name: Standby Service Charge - Secondary Power Sector: Commercial Description: This option is for general service customers, who own or operate in part, customer owned generators on their premises. Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

71

Data:2188ffb5-61d9-4f7c-b903-7438fc2f9054 | Open Energy Information  

Open Energy Info (EERE)

8ffb5-61d9-4f7c-b903-7438fc2f9054 8ffb5-61d9-4f7c-b903-7438fc2f9054 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Street Lighting- 250W HPS- Ornamental Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish,install, and maintain street lighting units. This rate is subject to the Power Cost Adjustment Clause. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=6490 Source Parent: Comments Applicability Demand (kW)

72

Data:000e60f7-120d-48ab-a1f9-9c195329c628 | Open Energy Information  

Open Energy Info (EERE)

f7-120d-48ab-a1f9-9c195329c628 f7-120d-48ab-a1f9-9c195329c628 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Area Lighting Customer Lease 250W HPS Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

73

Data:E0a904e4-035e-472e-af3f-7ee0cd1d5ebd | Open Energy Information  

Open Energy Info (EERE)

4e4-035e-472e-af3f-7ee0cd1d5ebd 4e4-035e-472e-af3f-7ee0cd1d5ebd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Quakertown, Pennsylvania (Utility Company) Effective date: 2012/09/26 End date if known: Rate name: Industrial service rate (2) V2 Sector: Industrial Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

74

Data:C2016a08-c44b-4835-aeee-f7b01a1c98ec | Open Energy Information  

Open Energy Info (EERE)

a08-c44b-4835-aeee-f7b01a1c98ec a08-c44b-4835-aeee-f7b01a1c98ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 150 TRENTON TYPE III Sector: Commercial Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

75

Data:94d06976-03c6-46f7-a433-abc5f4968d3a | Open Energy Information  

Open Energy Info (EERE)

6976-03c6-46f7-a433-abc5f4968d3a 6976-03c6-46f7-a433-abc5f4968d3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 20000 lumen 454 watt MV (limited) Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

76

Data:7fa2625f-57f9-4910-a95c-60f529f074f7 | Open Energy Information  

Open Energy Info (EERE)

25f-57f9-4910-a95c-60f529f074f7 25f-57f9-4910-a95c-60f529f074f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2012/04/01 End date if known: Rate name: Parallel Generation Rate Simultaneous Purchase and Sale Rate Large Commercial Sector: Commercial Description: Less than 40 KW Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

77

Data:19c7b9ce-07b8-4188-ad97-51ba2cb519f7 | Open Energy Information  

Open Energy Info (EERE)

b9ce-07b8-4188-ad97-51ba2cb519f7 b9ce-07b8-4188-ad97-51ba2cb519f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: TDGSA Sector: Industrial Description: Source or reference: ISU Binder Source Parent: Comments flat & fuel adjustment charges vary month to month Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

78

Data:7b602cbb-75f7-451d-bb87-0e5a765cb013 | Open Energy Information  

Open Energy Info (EERE)

cbb-75f7-451d-bb87-0e5a765cb013 cbb-75f7-451d-bb87-0e5a765cb013 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting - Floodlight 1000 Watt MH Sector: Residential Description: Source or reference: https://www.santeecooper.com/business/equipment-leases/outdoor-lighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

79

Data:60bbd68c-86f7-400b-a280-156c7c97fedd | Open Energy Information  

Open Energy Info (EERE)

bbd68c-86f7-400b-a280-156c7c97fedd bbd68c-86f7-400b-a280-156c7c97fedd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Baudette, Minnesota (Utility Company) Effective date: 2011/04/20 End date if known: Rate name: Rate 6 Off Peak Commercial Sector: Commercial Description: Off-peak rates are for winter months only: Sept 21 - June 20. The other time will be calculated using Rate 2 Commercial rates. The monthly fixed charge is a weighted average between the two rates. Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW):

80

Data:0262df45-995c-4482-a49f-7b06d8c26253 | Open Energy Information  

Open Energy Info (EERE)

df45-995c-4482-a49f-7b06d8c26253 df45-995c-4482-a49f-7b06d8c26253 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Greendale, Indiana (Utility Company) Effective date: End date if known: Rate name: Security light service - 250 Watt Sodium Sector: Lighting Description: Source or reference: http://cityofgreendale.net Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Data:807d07f4-f7f8-4d76-a114-5585a298dc03 | Open Energy Information  

Open Energy Info (EERE)

f4-f7f8-4d76-a114-5585a298dc03 f4-f7f8-4d76-a114-5585a298dc03 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Martinsville, Virginia (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Large Power Service (L.P.S. Sector: Industrial Description: * Available for large business,industrial and commercial operations whose normal service requirement exceeds 1000 KW? Source or reference: http://www.martinsville-va.gov/content/File/Electric%20Dept/electric_utility_rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

82

Data:3ca194db-15de-43e0-8f7b-7b00a60b71eb | Open Energy Information  

Open Energy Info (EERE)

db-15de-43e0-8f7b-7b00a60b71eb db-15de-43e0-8f7b-7b00a60b71eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Lighting Service - Signal Light Sector: Lighting Description: Available system wide to all security, street, and signal lighting. Additional charge if transformer is required - $3.23 monthly. Additional charge if service and pole are required - $1.08. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

83

Data:207bf0f7-60a7-4a85-9860-ede34b231f00 | Open Energy Information  

Open Energy Info (EERE)

bf0f7-60a7-4a85-9860-ede34b231f00 bf0f7-60a7-4a85-9860-ede34b231f00 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: McCook Public Power District Effective date: 2012/01/01 End date if known: Rate name: Irrigation Single Phase Three Days Control Sector: Industrial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

84

Data:C2940112-ff11-4652-99f7-5be8e537e4be | Open Energy Information  

Open Energy Info (EERE)

40112-ff11-4652-99f7-5be8e537e4be 40112-ff11-4652-99f7-5be8e537e4be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rita Blanca Electric Coop, Inc Effective date: 2009/01/01 End date if known: Rate name: Irrigation-Water Pumping Sector: Commercial Description: *Subject to Power Cost Recovery Factor and Power Factor Adjustment. Source or reference: http://ritablancaelectric.com/page5.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

85

Data:7712ec91-bf78-46f7-b865-4d9b14fd5d20 | Open Energy Information  

Open Energy Info (EERE)

1-bf78-46f7-b865-4d9b14fd5d20 1-bf78-46f7-b865-4d9b14fd5d20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bellevue, Iowa (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Residential Electric Sector: Residential Description: Source or reference: Rate Binder# 1B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

86

Data:69d0b82c-6f7b-479c-be5f-69b8ae37de3b | Open Energy Information  

Open Energy Info (EERE)

c-6f7b-479c-be5f-69b8ae37de3b c-6f7b-479c-be5f-69b8ae37de3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation CYC 1 - Sunday Only - Three Phase Sector: Industrial Description: Source or reference: Illinois State University binder #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

87

Data:77429458-8e3e-4266-bbf2-b86acf47a0f7 | Open Energy Information  

Open Energy Info (EERE)

58-8e3e-4266-bbf2-b86acf47a0f7 58-8e3e-4266-bbf2-b86acf47a0f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Light Service HPS 1000 W - Flood Sector: Lighting Description: *Fixed monthly charge is the sum of fixture charge, energy charge, and pole charge. Adjustment includes power cost adjustment rider and tax expense adjustment rider Source or reference: http://www.coastepa.com/myHome/rateSchedules/lightservice.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

88

Data:923fe64d-0413-4a48-9a4b-1a4793f7a4e9 | Open Energy Information  

Open Energy Info (EERE)

fe64d-0413-4a48-9a4b-1a4793f7a4e9 fe64d-0413-4a48-9a4b-1a4793f7a4e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - INT (Secondary Metering Voltage) Sector: Industrial Description: At the consumer's option where the consumer's average billing demand is 500 kW or more, where service may be interrupted by the Cooperative or its designee, and for which the Cooperative has been able to acquire wholesale interruptible service from Seminole Electric Cooperative, Inc. (Seminole) under its Rate Schedule INT-2.

89

Data:F461b5f7-c795-45ec-94c6-ef322169fe3b | Open Energy Information  

Open Energy Info (EERE)

1b5f7-c795-45ec-94c6-ef322169fe3b 1b5f7-c795-45ec-94c6-ef322169fe3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ninnescah Rural E C A Inc Effective date: 2012/03/01 End date if known: Rate name: Irrigation Rate - Direct Cooperative Control Sector: Commercial Description: Available for pump irrigation service and other non-domestic farm use incidental to irrigation. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

90

Data:E3745d39-20f7-4dce-96de-aba04d0601cb | Open Energy Information  

Open Energy Info (EERE)

45d39-20f7-4dce-96de-aba04d0601cb 45d39-20f7-4dce-96de-aba04d0601cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: Commercial Space Heating Three-Phase Primary Voltage Sector: Commercial Description: *Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD). Applicable where service is measured by one meter, electricity is the primary source of energy for heating, and demand is greater than 25 kW. Subject to retail production cost adjustment, power factor adjustment, and 2% primary voltage discount.

91

Data:5d15f7f6-7cd9-4571-9737-aac7f0d0234e | Open Energy Information  

Open Energy Info (EERE)

f7f6-7cd9-4571-9737-aac7f0d0234e f7f6-7cd9-4571-9737-aac7f0d0234e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: Primary ( 1000 KVA) P5 Sector: Industrial Description: Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01_final.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

92

Data:D5b35814-7388-45d3-a449-6465a5852f7f | Open Energy Information  

Open Energy Info (EERE)

388-45d3-a449-6465a5852f7f 388-45d3-a449-6465a5852f7f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 100 DELUXE ACORN H.P Sector: Lighting Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

93

Data:F62bc6ae-cca2-482d-978f-39f7c0f5cc39 | Open Energy Information  

Open Energy Info (EERE)

ae-cca2-482d-978f-39f7c0f5cc39 ae-cca2-482d-978f-39f7c0f5cc39 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Battle Creek, Nebraska (Utility Company) Effective date: End date if known: Rate name: Residential All Electric Sector: Residential Description: Source or reference: ISU Documentation Rate Binder Ted 6 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

94

Data:7cf1840e-73e6-44b8-b3bd-623df9f7ce8b | Open Energy Information  

Open Energy Info (EERE)

e-73e6-44b8-b3bd-623df9f7ce8b e-73e6-44b8-b3bd-623df9f7ce8b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Large Power With Discount Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

95

Data:E9e782ff-3671-4697-b580-f7a7d210d70a | Open Energy Information  

Open Energy Info (EERE)

2ff-3671-4697-b580-f7a7d210d70a 2ff-3671-4697-b580-f7a7d210d70a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Schuyler, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Rate Schedule 10-Residential Service Sector: Residential Description: To single-family residences and individually metered apartments for all domestic purposes when all service is supplied through a single meter. Source or reference: http://schuylerdevelopment.net/storage/Electric_Rates_2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

96

Data:Cf53fd19-51e0-4a8a-9465-d8f7ee28928a | Open Energy Information  

Open Energy Info (EERE)

fd19-51e0-4a8a-9465-d8f7ee28928a fd19-51e0-4a8a-9465-d8f7ee28928a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Springville, New York (Utility Company) Effective date: 2010/11/01 End date if known: Rate name: Security Lighting (400 Watt Mercury Vapor Horizontal Burning Flood fixture with mounting bracket Sector: Commercial Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

97

Data:9f8227f8-89b7-466c-9180-fc08a4229f7c | Open Energy Information  

Open Energy Info (EERE)

f8-89b7-466c-9180-fc08a4229f7c f8-89b7-466c-9180-fc08a4229f7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: Schedule "GS-7" Sector: Residential Description: Applicable to Non- Residential consumers requiring single-phase service and transformer capacity of 50 kVA or less. Not available solely for irrigation service. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

98

Data:9d95d617-133f-4ec6-94eb-ab811f7c29b7 | Open Energy Information  

Open Energy Info (EERE)

d617-133f-4ec6-94eb-ab811f7c29b7 d617-133f-4ec6-94eb-ab811f7c29b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: Large Light and Power Sector: Industrial Description: To any customer whose requirements are taken through one meter, under a contract of standard form, where the customer's billing demand does not exceed 300 KW in any month of a 12-month period. (Not applicable to resale, standby or auxiliary service.) Source or reference: http://www.loup.com/docs/customersvc/LP-Rates2013.pdf

99

Data:44e04307-dc3b-43f7-9bc0-68779c1f9615 | Open Energy Information  

Open Energy Info (EERE)

4307-dc3b-43f7-9bc0-68779c1f9615 4307-dc3b-43f7-9bc0-68779c1f9615 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Street Lighting: Ornamental Service Underground 150 Watt HPS Sector: Lighting Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

100

Data:7e10ef34-7fd5-488d-8692-5ce3f7b52cf9 | Open Energy Information  

Open Energy Info (EERE)

7fd5-488d-8692-5ce3f7b52cf9 7fd5-488d-8692-5ce3f7b52cf9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lenoir, Tennessee (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.lcub.com/electric/SitePages/erates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:44fb2115-d097-4078-b11e-cde48f1f7da9 | Open Energy Information  

Open Energy Info (EERE)

fb2115-d097-4078-b11e-cde48f1f7da9 fb2115-d097-4078-b11e-cde48f1f7da9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bon Homme Yankton El Assn, Inc Effective date: 2012/05/01 End date if known: Rate name: Large Load 350-1500kva Sector: Industrial Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

102

Data:9773c94a-a5f7-4d6c-9af2-528749d83386 | Open Energy Information  

Open Energy Info (EERE)

c94a-a5f7-4d6c-9af2-528749d83386 c94a-a5f7-4d6c-9af2-528749d83386 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "Incandescent 202 Watt (Existing Pole) 69 Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

103

Data:852ae024-a41f-4ecc-8c90-5408b61212f7 | Open Energy Information  

Open Energy Info (EERE)

24-a41f-4ecc-8c90-5408b61212f7 24-a41f-4ecc-8c90-5408b61212f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Sodium Vapor, 46500 Lumen, 400 watts, Class A Sector: Lighting Description: Class A: Sodium Vapor or Mercury Vapor Lamps, owned and operated by Municipality. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

104

Data:D9dbd362-cb4e-4007-91f7-9fd58ec6182c | Open Energy Information  

Open Energy Info (EERE)

dbd362-cb4e-4007-91f7-9fd58ec6182c dbd362-cb4e-4007-91f7-9fd58ec6182c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bon Homme Yankton El Assn, Inc Effective date: 2012/05/01 End date if known: Rate name: Town Residential Single-Phase Sector: Residential Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

105

Data:24f3a175-5480-47e8-92b9-7fadd084f7f4 | Open Energy Information  

Open Energy Info (EERE)

a175-5480-47e8-92b9-7fadd084f7f4 a175-5480-47e8-92b9-7fadd084f7f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lawrenceburg, Tennessee (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: General Service <50kW Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

106

Data:0d3bb9f7-5b0f-442c-8507-bbe29d61ba78 | Open Energy Information  

Open Energy Info (EERE)

bb9f7-5b0f-442c-8507-bbe29d61ba78 bb9f7-5b0f-442c-8507-bbe29d61ba78 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Street Lighting Service(LPS 55 W) Sector: Lighting Description: To services for lighting public streets, alleys, throughways, public parks and playgrounds by use of City's facilities. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

107

Data:89bf7bc1-889f-4043-91f7-cff52ceff60e | Open Energy Information  

Open Energy Info (EERE)

bc1-889f-4043-91f7-cff52ceff60e bc1-889f-4043-91f7-cff52ceff60e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Non Metered 100W HPS Sector: Commercial Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

108

Data:24650dbf-455b-47a0-98f7-0ac6f86be656 | Open Energy Information  

Open Energy Info (EERE)

dbf-455b-47a0-98f7-0ac6f86be656 dbf-455b-47a0-98f7-0ac6f86be656 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Street Lighting Service(250 W HPS) Sector: Lighting Description: To services for lighting public streets, alleys, throughways, public parks and playgrounds by use of City's facilities. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

109

Data:C9447637-633b-40f7-882c-8fc92b731b18 | Open Energy Information  

Open Energy Info (EERE)

637-633b-40f7-882c-8fc92b731b18 637-633b-40f7-882c-8fc92b731b18 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: High Pressure Sodium 200w Horizontal Sector: Lighting Description: This schedule is for electric service required for security area lighting and for security flood lighting where electric service is supplied from a BCLP overhead wood pole system, unless otherwise indicated. Source or reference: http://www.bountifulutah.gov/PowerMain.aspx Source Parent: Comments Applicability Demand (kW)

110

Data:4d4060f7-db75-48ab-8ea2-ad72cab9c5cc | Open Energy Information  

Open Energy Info (EERE)

f7-db75-48ab-8ea2-ad72cab9c5cc f7-db75-48ab-8ea2-ad72cab9c5cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Potomac Electric Power Co Effective date: 2012/06/01 End date if known: Rate name: Telecommunications Network Service - Schedule TN Sector: Commercial Description: Source or reference: http://www.pepco.com/_res/documents/DCRates_TN.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

111

Data:5c84e5b4-40f7-4624-a2ee-1b9ba033c95f | Open Energy Information  

Open Energy Info (EERE)

b4-40f7-4624-a2ee-1b9ba033c95f b4-40f7-4624-a2ee-1b9ba033c95f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Electric Power Co (Louisiana) Effective date: 2013/03/01 End date if known: Rate name: MVS - Closed Offerings - 400 Watt MV - series - Steel Pole Sector: Lighting Description: Source or reference: https://www.swepco.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

112

Data:139c5ff9-b4f7-41a4-821c-75417f334e22 | Open Energy Information  

Open Energy Info (EERE)

b4f7-41a4-821c-75417f334e22 b4f7-41a4-821c-75417f334e22 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No2 Pinal Cnty Effective date: 2010/04/07 End date if known: Rate name: Lighting Rate Schedule No. 8-Owned By District-Standard Pole - Wood - 30 Ft-150 Watt Sector: Lighting Description: Applicability: Applicable to any type of photocell operated fixtures, either individual or multiple, operated from dusk to dawn. Source or reference: http://www.ed2.com/Docs/Rates/Security%20and%20Street%20Lighting%20Schedule%20No.%208.pdf Source Parent: Comments Applicability Demand (kW)

113

Data:C77e22e4-9ef0-49c5-87bd-9f7bbaeea43a | Open Energy Information  

Open Energy Info (EERE)

2e4-9ef0-49c5-87bd-9f7bbaeea43a 2e4-9ef0-49c5-87bd-9f7bbaeea43a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (400 HPS Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

114

Data:30956096-6906-487b-9a75-e76c58f7f93e | Open Energy Information  

Open Energy Info (EERE)

56096-6906-487b-9a75-e76c58f7f93e 56096-6906-487b-9a75-e76c58f7f93e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harmon Electric Assn Inc Effective date: 2010/04/25 End date if known: Rate name: Controllable Irrigation, 101HP or more Sector: Commercial Description: * Available to members of the Cooperative for pump irrigation service located adjacent to its three-phase lines. Total load during peak period for up to four(4) hours per day and not to exceed 30 days per year. Subject to Power Factor Adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW)

115

Data:13a1a79f-8f7c-4dc6-bb8a-cc8332d56949 | Open Energy Information  

Open Energy Info (EERE)

a1a79f-8f7c-4dc6-bb8a-cc8332d56949 a1a79f-8f7c-4dc6-bb8a-cc8332d56949 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Seasonal With Electric Heat Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

116

Data:66ce74fd-f7a0-49aa-ba37-81bc249a7f23 | Open Energy Information  

Open Energy Info (EERE)

4fd-f7a0-49aa-ba37-81bc249a7f23 4fd-f7a0-49aa-ba37-81bc249a7f23 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gallatin, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting Sector: Lighting Description: Source or reference: http://www.gallatinelectric.com/gallatin-electric-rates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

117

Data:2f469589-b5c0-40d6-bed3-832ed2f7c78a | Open Energy Information  

Open Energy Info (EERE)

69589-b5c0-40d6-bed3-832ed2f7c78a 69589-b5c0-40d6-bed3-832ed2f7c78a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Slash Pine Elec Member Corp Effective date: 1997/02/01 End date if known: Rate name: Outdoor Lighting 400 Watt HPS Flood Light Sector: Lighting Description: Applicable to Members for dust to dawn outdoor lighting, in close proximity to existing overhead secondary circuits. Source or reference: ISU Documentation Source Parent: Comments Additional Charges can be applied. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

118

Data:D1aaa365-5f7d-4c4c-8475-887600ff6285 | Open Energy Information  

Open Energy Info (EERE)

65-5f7d-4c4c-8475-887600ff6285 65-5f7d-4c4c-8475-887600ff6285 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2012/06/01 End date if known: Rate name: OUTDOOR RECREATIONAL LIGHTING SERVICE - SECONDARY "ORL" Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

119

Data:F2321389-fbb2-44f7-845d-f37976dd288c | Open Energy Information  

Open Energy Info (EERE)

fbb2-44f7-845d-f37976dd288c fbb2-44f7-845d-f37976dd288c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2012/11/09 End date if known: Rate name: Price Schedule - LVS Large General Service Time of Use at Primary Voltage Sector: Commercial Description: Source or reference: www.midamericanenergy.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

120

Data:Ec5914f7-12af-47cc-8af8-b4c1efdbbaf5 | Open Energy Information  

Open Energy Info (EERE)

914f7-12af-47cc-8af8-b4c1efdbbaf5 914f7-12af-47cc-8af8-b4c1efdbbaf5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 175 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:C46103cc-5042-4b1e-ad9b-8b792f7aafd6 | Open Energy Information  

Open Energy Info (EERE)

103cc-5042-4b1e-ad9b-8b792f7aafd6 103cc-5042-4b1e-ad9b-8b792f7aafd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Emerson, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 250 watt Mercury Vapor Sector: Lighting Description: All customers are eligible to lease private lighting owned and maintained by NeNPPD. This leased lighting is unmetered and NeNPPD provides all of the energy required. See other side for private lighting service agreement Source or reference: http://nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW):

122

Data:1065c311-963a-4f7e-939e-5ca7ecb4b569 | Open Energy Information  

Open Energy Info (EERE)

963a-4f7e-939e-5ca7ecb4b569 963a-4f7e-939e-5ca7ecb4b569 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Industrial Service Sector: Industrial Description: To all electric service requiring up to 1,000 measured kW during a single billing period delivered to one point on the Consumer's premises and metered at primary voltage. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

123

Data:24dc18a0-bfb0-44d0-bad0-807beebee7f7 | Open Energy Information  

Open Energy Info (EERE)

8a0-bfb0-44d0-bad0-807beebee7f7 8a0-bfb0-44d0-bad0-807beebee7f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: Power and Light Sector: Industrial Description: To electric service of one standard voltage requiring 50 kVA or more of transformer capacity delivered at one point on the consumer's premises and metered at or compensated to that voltage. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

124

Data:Ebc0a6f7-0957-45aa-8913-d9ff6c477d54 | Open Energy Information  

Open Energy Info (EERE)

Ebc0a6f7-0957-45aa-8913-d9ff6c477d54 Ebc0a6f7-0957-45aa-8913-d9ff6c477d54 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2009/02/24 End date if known: Rate name: Schedule SM - Three Phase - Small Commercial Load Development (Over 125 kW) Sector: Commercial Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

125

Data:Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 | Open Energy Information  

Open Energy Info (EERE)

Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Customer Area Lighting Service- Rate 7: Directional Lighting, Metal Halide, 40,000 Lumen, 400 Watt Sector: Lighting Description: Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

126

Data:65a49a12-a982-4cf5-8447-6f7ea00191e7 | Open Energy Information  

Open Energy Info (EERE)

a982-4cf5-8447-6f7ea00191e7 a982-4cf5-8447-6f7ea00191e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2012/04/01 End date if known: Rate name: Parallel Generation Rate Time of Day Purchase Rate Industrial Sector: Industrial Description: Less than 40KW Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

127

Data:Bf649cf0-a40e-4f7c-abac-bc899daccce6 | Open Energy Information  

Open Energy Info (EERE)

a40e-4f7c-abac-bc899daccce6 a40e-4f7c-abac-bc899daccce6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Street Lighting non ornamental 250w mv Sector: Lighting Description: street lighting, non ornamental mercury vapor 250 watt with max. 105kwh per lamp Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

128

Data:1604d236-f7f9-430a-9f71-b66e53ec22ff | Open Energy Information  

Open Energy Info (EERE)

d236-f7f9-430a-9f71-b66e53ec22ff d236-f7f9-430a-9f71-b66e53ec22ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Service Sector: Residential Description: To single family dwelling units supplied through one meter and individually metered apartments for all domestic uses. Source or reference: http://www.ci.independence.mo.us/PL/Rates.aspx Source Parent: Comments Minimum monthly charge of $4.14. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

129

Data:A92c7490-23f7-4411-9ba1-1abaef2d5087 | Open Energy Information  

Open Energy Info (EERE)

c7490-23f7-4411-9ba1-1abaef2d5087 c7490-23f7-4411-9ba1-1abaef2d5087 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 16000 lumen 173 watt SV 2 Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

130

Data:29e29f7e-56af-45af-b079-9612617f0108 | Open Energy Information  

Open Energy Info (EERE)

f7e-56af-45af-b079-9612617f0108 f7e-56af-45af-b079-9612617f0108 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central New Mexico El Coop, Inc Effective date: End date if known: Rate name: Time of Use Residential Service w/o Electric Thermal Storage (rate 25 OFF) Sector: Residential Description: Any residential consumers without an ETS unit wishing to abide by the on peak off peak hours are eligible. Source or reference: http://cnmec.org/index.php?page=electric-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

131

Data:231a984a-fb1e-4b5e-ab7f-7f9cc8f91363 | Open Energy Information  

Open Energy Info (EERE)

fb1e-4b5e-ab7f-7f9cc8f91363 fb1e-4b5e-ab7f-7f9cc8f91363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: PRIVATE AREA LIGHTING SERVICE 175 W MV Sector: Lighting Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

132

Data:932b57f7-e60f-482a-9b83-e9da2b25730d | Open Energy Information  

Open Energy Info (EERE)

f7-e60f-482a-9b83-e9da2b25730d f7-e60f-482a-9b83-e9da2b25730d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wild Rice Electric Coop, Inc Effective date: 2012/03/18 End date if known: Rate name: FARM AND HOME SERVICE - Up to 37.5 KVA transformer Sector: Residential Description: Source or reference: http://www.wildriceelectric.com/b-rate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

133

Data:A4444000-d511-413f-a9f7-a4f937228e9d | Open Energy Information  

Open Energy Info (EERE)

000-d511-413f-a9f7-a4f937228e9d 000-d511-413f-a9f7-a4f937228e9d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Large Power Contract Secondary Sector: Description: Excess kVA Source or reference: http://www.les.com/your_business/rate_schedules_lpc.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

134

Data:2e1de6c8-51f7-4ec6-bd6b-42d9536a085f | Open Energy Information  

Open Energy Info (EERE)

c8-51f7-4ec6-bd6b-42d9536a085f c8-51f7-4ec6-bd6b-42d9536a085f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cadott, Wisconsin (Utility Company) Effective date: 2000/10/19 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 45 kilowatts for three or more months in a consecutive 12-month period.

135

Data:18f6aa96-79f7-4242-97c8-b570b8e45dda | Open Energy Information  

Open Energy Info (EERE)

6-79f7-4242-97c8-b570b8e45dda 6-79f7-4242-97c8-b570b8e45dda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Washington Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Non-Residential Service Sector: Commercial Description: See Source Source or reference: http://www.weci.org/lib/sitefiles/pdf/Non_Residential_Rate.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

136

Data:71376148-4375-4bcd-a4b2-07ee94f7c427 | Open Energy Information  

Open Energy Info (EERE)

148-4375-4bcd-a4b2-07ee94f7c427 148-4375-4bcd-a4b2-07ee94f7c427 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Tennessee (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Coincident Peak Rate -98-2 Sector: Commercial Description: City reserves the right, when in its opinion the installation would not be detrimental to the service of the City, to permit other types of motors. Source or reference: http://www.lexingtonnc.net/modules/showdocument.aspx?documentid=412 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

137

Data:76a5ec04-984f-474e-94fa-f7aad3b134d6 | Open Energy Information  

Open Energy Info (EERE)

ec04-984f-474e-94fa-f7aad3b134d6 ec04-984f-474e-94fa-f7aad3b134d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Schuyler, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Rate Schedule 30- Commercial Electric Heat Service Sector: Commercial Description: To any non-residential customer for lighting, electric space heating and power purposes. Source or reference: http://schuylerdevelopment.net/storage/Electric_Rates_2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

138

Data:99d23271-5081-4aff-83d4-8a23fc6842f7 | Open Energy Information  

Open Energy Info (EERE)

271-5081-4aff-83d4-8a23fc6842f7 271-5081-4aff-83d4-8a23fc6842f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oahe Electric Coop Inc Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting 175 W MV:Unmetered Sector: Lighting Description: Available to individual consumers and municipalities, towns, and villages for dusk to dawn outdoor lighting in close proximity to existing overhead secondary circuits South Dakota Sales Tax is applicable to this rate. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW):

139

Data:27d53350-4e85-4960-9c85-8f7bf40b437a | Open Energy Information  

Open Energy Info (EERE)

4e85-4960-9c85-8f7bf40b437a 4e85-4960-9c85-8f7bf40b437a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Rural Electric Coop Inc Effective date: 2012/10/01 End date if known: Rate name: Large Power Service - Primary Delivery Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

140

Data:F16b6125-36f7-46e5-9712-519928ba23c3 | Open Energy Information  

Open Energy Info (EERE)

25-36f7-46e5-9712-519928ba23c3 25-36f7-46e5-9712-519928ba23c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting- LS- Part B (1000W MV or Incandescent) Sector: Lighting Description: Applicable for outdoor lighting for individual customers. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:66c37bc7-8f7e-42a9-8838-80236ced9ecd | Open Energy Information  

Open Energy Info (EERE)

c37bc7-8f7e-42a9-8838-80236ced9ecd c37bc7-8f7e-42a9-8838-80236ced9ecd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Night Light Rate- 250 W HPS Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

142

Data:774050f6-4fcb-41af-9621-93a5ac4554f7 | Open Energy Information  

Open Energy Info (EERE)

-4fcb-41af-9621-93a5ac4554f7 -4fcb-41af-9621-93a5ac4554f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (55 LPS Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

143

Data:6d4aa07b-5394-4c37-a0cf-d06f3e928f7d | Open Energy Information  

Open Energy Info (EERE)

b-5394-4c37-a0cf-d06f3e928f7d b-5394-4c37-a0cf-d06f3e928f7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Idle Services Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

144

Data:F02efadc-3e60-4f4e-a718-d50f7ab58465 | Open Energy Information  

Open Energy Info (EERE)

efadc-3e60-4f4e-a718-d50f7ab58465 efadc-3e60-4f4e-a718-d50f7ab58465 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Agricultural Related Commercial Rate Sector: Commercial Description: Applicable to specific agricultural commercial services including dairies and other agricultural products processing facilities. Source or reference: ISU Documentation Source Parent: Comments The bill is subject to a power supply adjuster as set forth in the District's power cost adjuster rate tariff. Applicability Demand (kW)

145

Data:C01faa18-b8f7-4110-830c-9281f26a3051 | Open Energy Information  

Open Energy Info (EERE)

8-b8f7-4110-830c-9281f26a3051 8-b8f7-4110-830c-9281f26a3051 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2009/06/01 End date if known: Rate name: Schedule SL - Street Lighting Service - Mercury Vapor 250 watts Sector: Lighting Description: Total Charge = $3.41 plus 100 kWh/Light/month @ GP-1 Rate. 11.647 = $3.41 + (.08237 x 100) Source or reference: Kentucky Public Service Commision Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

146

Data:4feee115-31de-4cba-b0f7-733700e1cae8 | Open Energy Information  

Open Energy Info (EERE)

feee115-31de-4cba-b0f7-733700e1cae8 feee115-31de-4cba-b0f7-733700e1cae8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (250 FL Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

147

Data:2fecee7e-12b7-44b7-8533-ac03fd90f7d8 | Open Energy Information  

Open Energy Info (EERE)

fecee7e-12b7-44b7-8533-ac03fd90f7d8 fecee7e-12b7-44b7-8533-ac03fd90f7d8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russellville, Kentucky (Utility Company) Effective date: End date if known: Rate name: 400W Wide Light- Metal Halide Sector: Lighting Description: Source or reference: http://www.russepb.com/rates.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

148

Data:A5fe7b3a-516b-48b0-b30c-43cf234c42f7 | Open Energy Information  

Open Energy Info (EERE)

b3a-516b-48b0-b30c-43cf234c42f7 b3a-516b-48b0-b30c-43cf234c42f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: SL - Public Street Lighting City of Ulen 175 watt sodium vapor Sector: Lighting Description: Availability Available for any standard overhead Public Street Lighting Service. Character of Service Public Street Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html Source Parent: Comments Applicability Demand (kW)

149

Data:E2f83449-e3ef-4f67-840c-6560bca7f6f7 | Open Energy Information  

Open Energy Info (EERE)

449-e3ef-4f67-840c-6560bca7f6f7 449-e3ef-4f67-840c-6560bca7f6f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Frederick, Colorado (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Industrial Sector: Industrial Description: This rate applies to all lighting and power service loads for industrial uses requiring single-phase oe three-phase service exceeding 25 kilowatts. Source or reference: frederickco.gov Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

150

Data:F890887d-0589-432d-86fa-23f7cb15e6db | Open Energy Information  

Open Energy Info (EERE)

d-0589-432d-86fa-23f7cb15e6db d-0589-432d-86fa-23f7cb15e6db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sparta, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: SDE SMSC Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

151

Data:1aa2e684-2be7-44ac-b5f7-f33e4522dbfd | Open Energy Information  

Open Energy Info (EERE)

4-2be7-44ac-b5f7-f33e4522dbfd 4-2be7-44ac-b5f7-f33e4522dbfd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coos-Curry Electric Coop, Inc Effective date: 2011/12/22 End date if known: Rate name: Security Lighting, 250 Watt HPSF Sector: Lighting Description: * For yard or security lighting. Source or reference: Rate binder #4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

152

Data:B18495f7-fd81-4ff3-b986-26b23dcfbc64 | Open Energy Information  

Open Energy Info (EERE)

495f7-fd81-4ff3-b986-26b23dcfbc64 495f7-fd81-4ff3-b986-26b23dcfbc64 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: M J M Electric Cooperative Inc Effective date: End date if known: Rate name: Single Phase Seasonal (25 KVA & Under) Sector: Commercial Description: Single Phase Seasonal (25 KVA & Under) Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

153

Data:Fca73d05-5565-46a0-a8c3-e95124e79f7f | Open Energy Information  

Open Energy Info (EERE)

Fca73d05-5565-46a0-a8c3-e95124e79f7f Fca73d05-5565-46a0-a8c3-e95124e79f7f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Residential Service (Residential Space Heating)) Sector: Residential Description: Entire service area Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

154

Data:755707f7-d5e3-43cf-b71c-6ad018d32248 | Open Energy Information  

Open Energy Info (EERE)

f7-d5e3-43cf-b71c-6ad018d32248 f7-d5e3-43cf-b71c-6ad018d32248 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dover, Ohio (Utility Company) Effective date: 2006/08/01 End date if known: Rate name: General Service Rates Sector: Commercial Description: Source or reference: http://www.doverohio.com/utilities/compare-rates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

155

Data:Acccb0ac-60f7-4694-a5a3-dc6eb4140f42 | Open Energy Information  

Open Energy Info (EERE)

Acccb0ac-60f7-4694-a5a3-dc6eb4140f42 Acccb0ac-60f7-4694-a5a3-dc6eb4140f42 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Distributed Generation Rider-Domestic All Electric Load Control Sector: Residential Description: *Installation is available to consumers for installation of generation facilities at their homes or businesses. Demand credit shall be lower of the following: $4.00 per kW of determined connected load or $4.00 per kW of connected generation capacity. Energy credit is(0.007)per kWh during May through September.

156

Data:Dd791421-9638-4d46-9113-41f7c766b564 | Open Energy Information  

Open Energy Info (EERE)

21-9638-4d46-9113-41f7c766b564 21-9638-4d46-9113-41f7c766b564 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitewater Valley Rural EMC Effective date: 2011/01/01 End date if known: Rate name: Schedule RES - Farm and Residential Service (Single Phase) Sector: Residential Description: Residential and Farm Services Source or reference: http://www.wwvremc.com/documents/Res_Rate_Schedules_Effective_May_1_2010.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

157

Data:2954f88b-9347-41ee-be32-f7ebd1422f85 | Open Energy Information  

Open Energy Info (EERE)

8b-9347-41ee-be32-f7ebd1422f85 8b-9347-41ee-be32-f7ebd1422f85 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Bethel, Ohio (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

158

Data:8ce6c109-5f7d-4fa4-8347-0014dce93efe | Open Energy Information  

Open Energy Info (EERE)

5f7d-4fa4-8347-0014dce93efe 5f7d-4fa4-8347-0014dce93efe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2008/10/01 End date if known: Rate name: Pole Security Light Only Sector: Lighting Description: Source or reference: http://www.tri-countyemc.com/skins/userfiles/file/Outdoor_lighting_1_2_3.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

159

Data:51683c98-1d03-4208-a2f7-47df5972e384 | Open Energy Information  

Open Energy Info (EERE)

1d03-4208-a2f7-47df5972e384 1d03-4208-a2f7-47df5972e384 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: INSTITIONAL SERVICE RATE 30000 Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

160

Data:8041679f-7d92-4b49-bd97-0e9bf964678f | Open Energy Information  

Open Energy Info (EERE)

f-7d92-4b49-bd97-0e9bf964678f f-7d92-4b49-bd97-0e9bf964678f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of North Little Rock, Arkansas (Utility Company) Effective date: 2012/09/01 End date if known: Rate name: HPS- 150 Watt Sector: Lighting Description: Source or reference: http://nlrelectric.com/assets/ratetariffs/AllNightOutdoorLightingL4Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:Ae4c7fae-f202-4932-bd9d-355d1f7e65f8 | Open Energy Information  

Open Energy Info (EERE)

fae-f202-4932-bd9d-355d1f7e65f8 fae-f202-4932-bd9d-355d1f7e65f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Private Outdoor Security Lighting- 400W High Pressure Sodium Sector: Lighting Description: This schedule is available at any point on the Energy Department electric system where facilities of adequate capacity and standard lighting voltage levels are available. Source or reference: http://secure.provocitypower.com/Schedule%2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

162

Data:0cb8c1de-a792-428c-b25f-7f5a5630356b | Open Energy Information  

Open Energy Info (EERE)

c1de-a792-428c-b25f-7f5a5630356b c1de-a792-428c-b25f-7f5a5630356b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period.

163

Data:562758d6-e920-4cd3-8a03-aaaf87dfc6f7 | Open Energy Information  

Open Energy Info (EERE)

e920-4cd3-8a03-aaaf87dfc6f7 e920-4cd3-8a03-aaaf87dfc6f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Customer-Owned Fixture - Decorative 100 Watt HPS Traditionaire Dark Skies adder Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

164

Data:15661511-101e-483c-b379-c9ee26f7dd9a | Open Energy Information  

Open Energy Info (EERE)

101e-483c-b379-c9ee26f7dd9a 101e-483c-b379-c9ee26f7dd9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Company-Owned Fixture - Floodlights 400 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

165

Data:15abef74-5e5f-447c-bcf3-1510838324f7 | Open Energy Information  

Open Energy Info (EERE)

abef74-5e5f-447c-bcf3-1510838324f7 abef74-5e5f-447c-bcf3-1510838324f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Idaho Power Co Effective date: 2011/09/18 End date if known: Rate name: Schedule 98 - Adjustment for Municipal Franchise Fees Sector: Description: Source or reference: http://www.idahopower.com/AboutUs/RatesRegulatory/Tariffs/tariffPDF.cfm?id=57 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

166

Coal News and Markets  

U.S. Energy Information Administration (EIA)

... (Energy Publishing, Coal & Energy Price Report, Bulletin, ... Although, the soaring demands of the Chinese steel industry are still with us, ...

167

Disaggregating regional energy supply/demand and flow data to 173 BEAs in support of export coal analysis. Final report  

SciTech Connect

This report documents the procedures and results of a study sponsored jointly by the US Department of Transportation and the US Department of Energy. The study was conducted to provide, Bureau of Economic Analysis (BEA)-level production/consumption data for energy materials for 1985 and 1990 in support of an analysis of transportation requirements for export coal. Base data for energy forecasts at the regional level were obtained from the Department of Energy, Energy Information Administration. The forecasts selected for this study are described in DOE/EIA's 1980 Annual Report to Congress, and are: 1985 Series, B, medium oil import price ($37.00/barrel); and 1990 Series B, medium oil import price ($41.00/barrel). Each forecast period is extensively described by approximately forty-three statistical tables prepared by EIA and made available to TERA for this study. This report provides sufficient information to enable the transportation analyst to appreciate the procedures employed by TERA to produce the BEA-level energy production/consumption data. The report presents the results of the procedures, abstracts of data tabulations, and various assumptions used for the preparation of the BEA-level data. The end-product of this effort was the BEA to BEA energy commodity flow data by more which serve as direct input to DOT's transportation network model being used for a detailed analysis of export coal transportation.

1981-06-01T23:59:59.000Z

168

Data:950109f7-27af-4032-b7c1-c80a1592baff | Open Energy Information  

Open Energy Info (EERE)

9f7-27af-4032-b7c1-c80a1592baff 9f7-27af-4032-b7c1-c80a1592baff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Rate Scheduel WPS-1 - Transmission Lines Sector: Commercial Description: A. This Rate Schedule WPS -1 is available only to municipalities who purchase from the District all of its power and energy requirements (with the exception of any direct Western allocation) for resale, including sales to end-use customers and load growth. B. This Rate Schedule WPS-1 is made available in conjunction with rate schedules that are a part of a Wholesale Power Agreement between the District and Nebraska Electric Generation and Transmission Cooperative, Inc. ("NEG&T"). In the event there is any inconsistency between the provisions of this Rate Schedule WPS -1 and those rate schedules which are a part of the District/NEG&T Wholesale Power Contract, then the provisions of the District/NEG&T Power Contract rate schedules shall govern

169

Data:9fedf299-fa1c-4570-9268-301f7ffd374e | Open Energy Information  

Open Energy Info (EERE)

fedf299-fa1c-4570-9268-301f7ffd374e fedf299-fa1c-4570-9268-301f7ffd374e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2008/01/01 End date if known: Rate name: RER-2 Industrial Renewable Energy Rider Sector: Description: Service under this rider is available to all customers currently served under rate Schedules Cp-1, Cp-2, and Cp-3. This rider allows customers the option of purchasing blocks of their energy from renewable sources. The Block Charge for this service is $2.00 per 300kWh of renewable energy per month. Renewable energy will be sold only in blocks of 300kWh with a minimum of 100 blocks per month.

170

Data:22f850fa-7824-4727-8f7e-6245ed098ef7 | Open Energy Information  

Open Energy Info (EERE)

0fa-7824-4727-8f7e-6245ed098ef7 0fa-7824-4727-8f7e-6245ed098ef7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

171

Data:64454414-d56c-4765-b96f-7a930c0674a0 | Open Energy Information  

Open Energy Info (EERE)

14-d56c-4765-b96f-7a930c0674a0 14-d56c-4765-b96f-7a930c0674a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2008/09/30 End date if known: Rate name: Ms-1 Street and Yard lighting Service Street and Yard Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

172

Data:5cbe6608-fbe3-4656-9eea-1cac9ef737f7 | Open Energy Information  

Open Energy Info (EERE)

cbe6608-fbe3-4656-9eea-1cac9ef737f7 cbe6608-fbe3-4656-9eea-1cac9ef737f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Western Massachusetts Elec Co Effective date: 2013/06/01 End date if known: Rate name: Rate G-2 Primary General Service - Basic Service Sector: Industrial Description: This rate is applicable only to the entire use of electricity at a single location where service requires only primary facilities. Such service shall not exceed 349 kW. All electricity shall be measured through one meter, except that, where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed, then the measurement of electricity may be by two or more meters. All electricity supplied shall be for the exclusive use of the customer and shall not be resold. With the approval of the Company the customer may furnish electricity to persons or concerns who occupy space in the building to which service is supplied hereunder, but on the express condition that the customer shall not resell, make a specific charge for, or remeter (or submeter) or measure or control the use of, any of the electricity so furnished.

173

Data:10f9fdbb-08a1-4951-93bc-86365f7cca06 | Open Energy Information  

Open Energy Info (EERE)

fdbb-08a1-4951-93bc-86365f7cca06 fdbb-08a1-4951-93bc-86365f7cca06 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Cp-1 Small Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

174

Data:95967906-1530-45f7-8a44-068cda3782a5 | Open Energy Information  

Open Energy Info (EERE)

6-1530-45f7-8a44-068cda3782a5 6-1530-45f7-8a44-068cda3782a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kootenai Electric Cooperative Effective date: 2011/07/01 End date if known: Rate name: Net Metering Residential Service Sector: Residential Description: Additional Information: Settle Up Any member generation in excess of a member's monthly kWh usage will be "banked" as kWh. Settle up of "banked" kWh will occur yearly on the December billing and/or prior to any rate change of this rate schedule. Any excess "banked" kWh will be calculated on this rate schedule and the credit applied to a member's electric statement.

175

Data:094448f7-5e81-4fd1-a274-d82e829faf5b | Open Energy Information  

Open Energy Info (EERE)

f7-5e81-4fd1-a274-d82e829faf5b f7-5e81-4fd1-a274-d82e829faf5b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/07/02 End date if known: Rate name: Large Commercial Time- Of- Use Excess Demand Three- Phase Service Sector: Commercial Description: * Excess Demand: Excess Demand shall be equal to the highest 30-minute kW measurement during all hours of the current month minus the On-Peak kW for the current month. On- Peak Demand: The on-peak period for the calendar months of June through August is defined as the hours starting at 2 p.m. and ending at 8 p.m., Monday through Friday, excluding the days on which the following holidays are observed: Independence Day. For the calendar months of September through May, there shall be no hours defined as on-peak.

176

Data:Ffd4b461-5991-4810-82c6-05d40c48f7ec | Open Energy Information  

Open Energy Info (EERE)

Ffd4b461-5991-4810-82c6-05d40c48f7ec Ffd4b461-5991-4810-82c6-05d40c48f7ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-2 and BGS-2 Zone 3 - Bundled Small General Delivery Service 600V to 15kV Sector: Commercial Description: AVAILABILITY Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that meets the following criteria: Customers served under this Rate shall have a maximum monthly Demand of less than 150 kilowatts (kW) as qualified in the Delivery Service Rate Reassignment section. A Customer without a demand meter installed, but with an average usage of less than 1,200 kWh per day during each monthly billing period will be normally assumed to have a maximum monthly Demand of less than 150 kW. Where Customer's average daily usage is 1,200 kWh per day or more in any monthly billing period, Company may install a demand meter at Company's expense to determine if Customer remains eligible for service under this Rate.

177

Data:9203c91f-7d51-486f-a398-add8a8014cd6 | Open Energy Information  

Open Energy Info (EERE)

f-7d51-486f-a398-add8a8014cd6 f-7d51-486f-a398-add8a8014cd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-2 Zone 3 - Small General Delivery Service 600V or Less Sector: Commercial Description: AVAILABILITY Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that meets the following criteria: Customers served under this Rate shall have a maximum monthly Demand of less than 150 kilowatts (kW) as qualified in the Delivery Service Rate Reassignment section. A Customer without a demand meter installed, but with an average usage of less than 1,200 kWh per day during each monthly billing period will be normally assumed to have a maximum monthly Demand of less than 150 kW. Where Customer's average daily usage is 1,200 kWh per day or more in any monthly billing period, Company may install a demand meter at Company's expense to determine if Customer remains eligible for service under this Rate.

178

U.S. Electric Utility Demand-Side Management 1994  

U.S. Energy Information Administration (EIA)

Preface. The U.S. Electric Utility Demand-Side Management report is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Elec-

179

Data:Dbd8d9f7-0b9e-4d69-b527-835c561fc572 | Open Energy Information  

Open Energy Info (EERE)

Dbd8d9f7-0b9e-4d69-b527-835c561fc572 Dbd8d9f7-0b9e-4d69-b527-835c561fc572 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: SL-1 - C - 100 watt - Overhead Sector: Commercial Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for standard street and highway lighting service to any Customer which is a Municipal Corporation.

180

Data:95c01297-25d4-4abd-931f-7c0fee51dbbb | Open Energy Information  

Open Energy Info (EERE)

1297-25d4-4abd-931f-7c0fee51dbbb 1297-25d4-4abd-931f-7c0fee51dbbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: KEM Electric Coop Inc Effective date: End date if known: Rate name: Grain Drying Controlled - Three Phase/Submeter Sector: Commercial Description: Available to all members who are drying agricultural crops. Type of Service This is a sub-meter service. Single phase greater than 50 kVa or three phase, 60 cycles, at secondary voltages. The Cooperative will provide sub-meter, meter socket, and C.T. equipment, and load management device necessary to measure and interrupt electric usage.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:D5cc0018-04f7-4e98-99e1-df95927ed633 | Open Energy Information  

Open Energy Info (EERE)

18-04f7-4e98-99e1-df95927ed633 18-04f7-4e98-99e1-df95927ed633 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wilton, Iowa (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Primary Power Rate Sector: Commercial Description: The primary power rate for electric energy sold by the system and accepted by the customer at primary voltage and metered at the point of delivery, with the transformers owned by and located on the customers property shall be at the Small General Service Rate less a 1% discount. Source or reference: Rate Binder Ted 2 ISU Documentation

182

Data:B4e9e353-2767-4876-b0e8-7b096c31b4f7 | Open Energy Information  

Open Energy Info (EERE)

e9e353-2767-4876-b0e8-7b096c31b4f7 e9e353-2767-4876-b0e8-7b096c31b4f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Residential Electric Service Sector: Residential Description: Available for all domestic purposes in individually metered dwelling units and in duplexes and triplexes, including the separately metered domestic facilities of a residential Customer (e.g., detached garage) and including rural domestic Customers engaged principally in agricultural pursuits. See definition of "Domestic Service.

183

Data:92ab1ed7-b7bf-4f7f-a7f1-8c67c65258bb | Open Energy Information  

Open Energy Info (EERE)

ed7-b7bf-4f7f-a7f1-8c67c65258bb ed7-b7bf-4f7f-a7f1-8c67c65258bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Street Lighting Service- 250W HPS Underground Aluminum Sector: Lighting Description: Available for lighting streets and roadways, whether public or private, which are thoroughfares for normal flow of vehicular traffic. This rate is generally available to governmental agencies. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181 Source Parent: Comments Applicability

184

Data:Eb6ca2f7-dc36-4439-b3fc-6fd13530c6e5 | Open Energy Information  

Open Energy Info (EERE)

Eb6ca2f7-dc36-4439-b3fc-6fd13530c6e5 Eb6ca2f7-dc36-4439-b3fc-6fd13530c6e5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (250W HPS-Flood) Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

185

Data:941f6386-2777-450b-9497-1f7e561c766a | Open Energy Information  

Open Energy Info (EERE)

2777-450b-9497-1f7e561c766a 2777-450b-9497-1f7e561c766a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: UNMETERED SECURITY LIGHTING: 150W HPS Sector: Lighting Description: AVAILABILITY This schedule is available for unmetered outdoor lighting service to any Customer. Unmetered security lighting shall only be available in locations or installations where, by determination of the Cooperative, it is not feasible and/or practical to install metered security lighting. New or replacement light installations shall be limited to high pressure sodium lights.

186

Data:5fc0f9f3-190b-422f-b754-03bc08d279f7 | Open Energy Information  

Open Energy Info (EERE)

fc0f9f3-190b-422f-b754-03bc08d279f7 fc0f9f3-190b-422f-b754-03bc08d279f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Area Lighting HPS 250 Watt Unmetered Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

187

Data:9e36c369-f7b9-499f-b282-635b7cc716e1 | Open Energy Information  

Open Energy Info (EERE)

9-f7b9-499f-b282-635b7cc716e1 9-f7b9-499f-b282-635b7cc716e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Cooperative Furnished Investment 150 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

188

Data:72f3a5f6-f7af-4b34-8539-aebcd13d3e67 | Open Energy Information  

Open Energy Info (EERE)

f6-f7af-4b34-8539-aebcd13d3e67 f6-f7af-4b34-8539-aebcd13d3e67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2011/01/01 End date if known: Rate name: RATE NO. 11 STREET LIGHTING-Single Fixture Light 50000 HPS Sector: Lighting Description: Applicability: To all customers for the purpose of outdoor lighting of streets alleys, thoroughfares, public parks and playgrounds. Service is dusk to dawn and District will own, operate and maintain the street lighting system including lamps and glass replacement. Monthly Usage: 400kWh Source or reference: http://www.ed3online.org/view/70

189

Data:14573167-660b-4a18-a1f7-8ee11b9d5419 | Open Energy Information  

Open Energy Info (EERE)

7-660b-4a18-a1f7-8ee11b9d5419 7-660b-4a18-a1f7-8ee11b9d5419 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2011/01/01 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-Metal Halide 175W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements. Monthly Usage: 74.2kWh

190

Data:Ca3b456d-2931-4aa1-82f7-62bd3bb5c15e | Open Energy Information  

Open Energy Info (EERE)

b456d-2931-4aa1-82f7-62bd3bb5c15e b456d-2931-4aa1-82f7-62bd3bb5c15e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Black Earth, Wisconsin (Utility Company) Effective date: 1999/08/01 End date if known: Rate name: Ms-1 Outdoor Lighting Service: Area Lighting-100 W HPS Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment Clause: Charge per all kWh varies monthly.

191

Data:14ca05f6-f402-47f7-aa65-f7476d864844 | Open Energy Information  

Open Energy Info (EERE)

5f6-f402-47f7-aa65-f7476d864844 5f6-f402-47f7-aa65-f7476d864844 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Private Lighting 250 W MH L-3 Sector: Lighting Description: New Lighting systems shall be overhead construction consisting of wood poles, aerial circuits, and conventional street lighting luminaries with mast arms not longer than ten feet, or floodlighting luminaries with no mast arms. The installed luminaries shall use low-pressure sodium lamps. All equipment used to provide service under this schedule will be furnished, owned, operated and maintained by the Springfield Utility Board.

192

Data:A69444d6-0ec2-458a-816f-7076f7caacaf | Open Energy Information  

Open Energy Info (EERE)

0ec2-458a-816f-7076f7caacaf 0ec2-458a-816f-7076f7caacaf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Excelsior Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting Service- 175W MH Sector: Lighting Description: Applicable only to outdoor lighting by means of ballast operated lamp fixtures that do not require a dedicated transformer and street lighting service by means of ballast operated lamp fixtures, subject to the established rules and regulations of the Cooperative. Source or reference: ISU Documentation Source Parent: Comments Applicability

193

Data:Cce17d4f-997c-4c75-945f-7b671a130bbb | Open Energy Information  

Open Energy Info (EERE)

Cce17d4f-997c-4c75-945f-7b671a130bbb Cce17d4f-997c-4c75-945f-7b671a130bbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Commercial Service-Single Phase, Schedule C-1 Sector: Commercial Description: Business, industrial and non-residential service such as schools, rural water districts, churches and public buildings, for all uses subject to the established rules and regulations of the Cooperative. Not available for irrigation uses. Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4

194

Data:93ebcf98-92fd-4f8c-899f-3a3f09f63f7e | Open Energy Information  

Open Energy Info (EERE)

ebcf98-92fd-4f8c-899f-3a3f09f63f7e ebcf98-92fd-4f8c-899f-3a3f09f63f7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Ludlow, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 05 Off Peak Water Heating Sector: Residential Description: Service will be supplied under this rate only during such hours as the Department may determine from time to time to meet conditions affecting the spare capacity available for this service, but in any event not less than thirteen hours daily. New applications for this rate have been discontinued. Source or reference: ISU Documentation DOE Sharepoint

195

Data:C1c41b60-03af-41f7-9164-be1815f94199 | Open Energy Information  

Open Energy Info (EERE)

b60-03af-41f7-9164-be1815f94199 b60-03af-41f7-9164-be1815f94199 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: Rate name: Maui-SCHEDULE F PUBLIC STREET LIGHTING-100/150/250 Watt High Pressure Sodium Sector: Lighting Description: Availability: Applicable to public street and highway lighting service supplied on the Island of Maui where the Company owns, maintains and operates the street lighting facilities. Minimum Charge: Fixture charge+$25.00 Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/MECO/MauiRatesSchF.pdf

196

Data:C5181f7a-ecf8-4826-a822-d09f44bf51f5 | Open Energy Information  

Open Energy Info (EERE)

f7a-ecf8-4826-a822-d09f44bf51f5 f7a-ecf8-4826-a822-d09f44bf51f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 400 watt MV/MH - Pendant Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

197

Data:05ef9398-9ca0-4f7e-8058-ae8742d8ba11 | Open Energy Information  

Open Energy Info (EERE)

398-9ca0-4f7e-8058-ae8742d8ba11 398-9ca0-4f7e-8058-ae8742d8ba11 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Industrial General Service Tax Exempt Rate 125 Sector: Industrial Description: *Specifically available for use by U.S. Government facilities exempt from the KWH tax within and outside the corporate limits of the City of St. Marys for lighting, heating, cooking and power. Character of service:120/240, 120/208, 208, 240, 480 Volt Alternating Current, 60 Hertz, Single or Three Phase as agreed to.

198

Data:67593b22-1802-4031-b635-d587f7d31b2d | Open Energy Information  

Open Energy Info (EERE)

b22-1802-4031-b635-d587f7d31b2d b22-1802-4031-b635-d587f7d31b2d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Santee Electric Coop, Inc Effective date: 2011/09/01 End date if known: Rate name: Public Street Lighting Service (Enclosed (100 Watt) (Sodium Vapor)) Sector: Commercial Description: This Schedule is available for the purpose of lighting dedicated public streets, highways, parks or public places for municipal, county, state and federal governments in all territory served by the Cooperative. Dedicated Poles 30' Wood = $ 2.00 35' Wood = $ 4.00 40' Wood = $ 5.00 45' Wood = $ 6.00 30' to 45' Fiberglass or Metal Pole = $ 16.17

199

Data:B27e3392-93ff-4d36-8d2f-f7b431083edf | Open Energy Information  

Open Energy Info (EERE)

e3392-93ff-4d36-8d2f-f7b431083edf e3392-93ff-4d36-8d2f-f7b431083edf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cimarron Electric Coop Effective date: 2008/10/01 End date if known: Rate name: Large Power (LP-1), Rate 8 Sector: Industrial Description: AVAILABILITY: Available to industrial power consumers using service under term contract, when service is taken at one location through one meter. No standby, resale or auxiliary permitted. The minimum bill shall be $350.00 Source or reference: ISU Documentation Source Parent: Comments Billing Adjustments: (a) Power Cost Adjustment (Reference Sheet No.1) (b) Tax Adjustment (Reference Sheet No.1)

200

Data:4b2f7a78-a78d-44de-b208-342a4c812ff8 | Open Energy Information  

Open Energy Info (EERE)

f7a78-a78d-44de-b208-342a4c812ff8 f7a78-a78d-44de-b208-342a4c812ff8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 - Yard Light (50w) HPS Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates Source Parent: Comments

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:883b0dce-785b-469a-b24c-3f8f7e392419 | Open Energy Information  

Open Energy Info (EERE)

dce-785b-469a-b24c-3f8f7e392419 dce-785b-469a-b24c-3f8f7e392419 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- HPS 70w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

202

Data:658ae0e3-ccff-4e29-b556-f7bcfe7f67f8 | Open Energy Information  

Open Energy Info (EERE)

ae0e3-ccff-4e29-b556-f7bcfe7f67f8 ae0e3-ccff-4e29-b556-f7bcfe7f67f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2007/07/01 End date if known: Rate name: STREET LIGHTING SERVICE RATE - TREYBURN 400 Watt Mercury Vapor Bulb Sector: Lighting Description: Availability: Available in all territory served by the Cooperative within the boundaries of Treyburn, subject to the Cooperative's established Service Rules and Regulations and the Agreement for Street Lights in Treyburn entered into by Piedmont EMC, the City of Durham and Treyburn. Applicability: This Schedule is applicable to unmetered consumer-owned street lighting within Treyburn. Character of Service.

203

Data:B7af34f7-3821-4757-9917-c5b0b80741cc | Open Energy Information  

Open Energy Info (EERE)

4f7-3821-4757-9917-c5b0b80741cc 4f7-3821-4757-9917-c5b0b80741cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cashton, Wisconsin (Utility Company) Effective date: 2009/02/15 End date if known: Rate name: Ms-1 Street Lighting Service: 100 W HPS(Overhead) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Power Cost Adjustment Clause: Charge per all kWh varies monthly. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=870

204

Data:86147e8e-26f7-4514-8c6f-c178de609036 | Open Energy Information  

Open Energy Info (EERE)

7e8e-26f7-4514-8c6f-c178de609036 7e8e-26f7-4514-8c6f-c178de609036 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: SL-1 - B - 400 watt - Twin Arm - Overhead Sector: Commercial Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for standard street and highway lighting service to any Customer which is a Municipal Corporation.

205

Data:Dfbb2c41-7784-4206-8f7b-787a493d01dc | Open Energy Information  

Open Energy Info (EERE)

Dfbb2c41-7784-4206-8f7b-787a493d01dc Dfbb2c41-7784-4206-8f7b-787a493d01dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Excelsior Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting Service- 100W HPS Sector: Lighting Description: Applicable only to outdoor lighting by means of ballast operated lamp fixtures that do not require a dedicated transformer and street lighting service by means of ballast operated lamp fixtures, subject to the established rules and regulations of the Cooperative. Source or reference: ISU Documentation Source Parent: Comments

206

Data:9e56c777-7a4d-46f7-bd44-f89910779f8c | Open Energy Information  

Open Energy Info (EERE)

7-7a4d-46f7-bd44-f89910779f8c 7-7a4d-46f7-bd44-f89910779f8c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Industrial Service Single Phase-Rate 7 Sector: Industrial Description: 1. Available for oil well pumping, commercial and industrial uses. 2. Service under this schedule is limited to consumers whose load requirements do not exceed 50kVA of transformer capacity. 3. 3. Subject to power cost adjustment, tax adjustment and rate revision. Source or reference: Rate binder # 4 Source Parent: Comments Applicability

207

Data:358d88d3-041f-405e-8277-2bb4d4d6b7f7 | Open Energy Information  

Open Energy Info (EERE)

d3-041f-405e-8277-2bb4d4d6b7f7 d3-041f-405e-8277-2bb4d4d6b7f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Nonlisted Light - 125 Watts Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

208

Data:0b1545f7-8058-45b8-8dc9-7bd649e7b271 | Open Energy Information  

Open Energy Info (EERE)

f7-8058-45b8-8dc9-7bd649e7b271 f7-8058-45b8-8dc9-7bd649e7b271 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE-Mercury Vapor, Open 175 W Sector: Lighting Description: 7000 Lumens, 175 W Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of lighting private outdoor areas or residential subdivision streets from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

209

Data:D21ef5ff-231b-40cd-bf95-728f7c614dc8 | Open Energy Information  

Open Energy Info (EERE)

ef5ff-231b-40cd-bf95-728f7c614dc8 ef5ff-231b-40cd-bf95-728f7c614dc8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Colorado Power Assn Effective date: 2008/06/18 End date if known: Rate name: Renewable Resource Power Service Sector: Description: SCHEDULE R 100 kWh Block Rate will be based on annual pricing for RECs from wholesale power provider's Rate Schedule R. Consumer's who agree to purchase monthly renewable energy under this schedule will specify the number of 100 kWh blocks to be purchased monthly. Source or reference: http://secpa.com/sites/rate-schedules.html Source Parent:

210

Data:0ea2fe17-e1f8-4703-a420-13f7ad9797e6 | Open Energy Information  

Open Energy Info (EERE)

7-e1f8-4703-a420-13f7ad9797e6 7-e1f8-4703-a420-13f7ad9797e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Cooperative Furnished Investment 400 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

211

Data:1fdafaa7-fba5-4de8-9cb2-8005b75f7dc2 | Open Energy Information  

Open Energy Info (EERE)

fdafaa7-fba5-4de8-9cb2-8005b75f7dc2 fdafaa7-fba5-4de8-9cb2-8005b75f7dc2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Santee Electric Coop, Inc Effective date: 2011/09/01 End date if known: Rate name: Public Street Lighting Service (Mongoose (400 Watt) (Metal Halide)) Sector: Commercial Description: This Schedule is available for the purpose of lighting dedicated public streets, highways, parks or public places for municipal, county, state and federal governments in all territory served by the Cooperative. Dedicated Poles 30' Wood = $ 2.00 35' Wood = $ 4.00 40' Wood = $ 5.00 45' Wood = $ 6.00

212

Data:9436a490-e0ac-4ae2-b5e0-9ed6196f7cd6 | Open Energy Information  

Open Energy Info (EERE)

a490-e0ac-4ae2-b5e0-9ed6196f7cd6 a490-e0ac-4ae2-b5e0-9ed6196f7cd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/04/01 End date if known: Rate name: ACTON Basic rate T2 (Nema) Sector: Industrial Description: Default Generation Service ("Default Service") shall be available to any Customer who, for any reason, is not receiving Generation Service from a Competitive Supplier. Service under this rate to any Customer is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

213

Data:7db0acb5-d503-4a19-87c3-f7f47dc39ff7 | Open Energy Information  

Open Energy Info (EERE)

acb5-d503-4a19-87c3-f7f47dc39ff7 acb5-d503-4a19-87c3-f7f47dc39ff7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: MGS Primary CIEP>500kw Three Phase Sector: Commercial Description: Available at any point of Company's system where facilities of adequate character and capacity exist for the entire electric service requirements of any customer delivered at one point and metered at or compensated to the voltage of delivery. This schedule is not available to residential customers. This is a bundled service

214

Data:915b63b4-1ff4-47f7-ab2f-69a1efe6991c | Open Energy Information  

Open Energy Info (EERE)

1ff4-47f7-ab2f-69a1efe6991c 1ff4-47f7-ab2f-69a1efe6991c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Coop Inc Effective date: 2011/10/01 End date if known: Rate name: General Service Rate Schedule B(Three phase 15kw or less and Temporary Service) Sector: Commercial Description: Applicable to all commercial and nonresidential light, heat, and power customers. Energy supplied under this schedule shall not be sub-metered for resale or resold to others, except for RV Parks which may be allowed to submeter individual spaces with the sub-metered tenants charged at Central Electric Cooperative, Inc.'s applicable rate schedule.

215

Data:330d7e27-910c-48f7-b61c-cc2c7ca27454 | Open Energy Information  

Open Energy Info (EERE)

e27-910c-48f7-b61c-cc2c7ca27454 e27-910c-48f7-b61c-cc2c7ca27454 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: Security Lighting Service- SL (175W MV) Sector: Lighting Description: To individual consumers for dusk to dawn out door lighting service in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments Applicability

216

Data:1a926b09-2f7a-4f6f-9357-cd32d5bc9226 | Open Energy Information  

Open Energy Info (EERE)

b09-2f7a-4f6f-9357-cd32d5bc9226 b09-2f7a-4f6f-9357-cd32d5bc9226 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: Street Lighting HPS 50w Sector: Lighting Description: APPLICABLE: To all public agencies for street lighting service which conforms to the System's street lighting specifications. CHARACTER OF SERVICE: The System will provide photocell controlled energy at 60 Hertz to all lighting systems and will construct, operate and maintain those lighting systems pursuant to agreements between the Customer and the System.

217

Data:883ce73d-1336-486e-85d4-015cca5326f7 | Open Energy Information  

Open Energy Info (EERE)

3d-1336-486e-85d4-015cca5326f7 3d-1336-486e-85d4-015cca5326f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 50000 Lumen 400 Watt High Pressure Sodium Streetlight Company Owned Underground Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

218

Data:Fd2b9529-a0f7-4099-bd77-88d96b2aadba | Open Energy Information  

Open Energy Info (EERE)

9-a0f7-4099-bd77-88d96b2aadba 9-a0f7-4099-bd77-88d96b2aadba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Outdoor Rental Lighting Service- Standard Security Lights- (250W HPS Flood) Sector: Lighting Description: Available for outdoor lighting of yards, walkways and other areas. Lights to be served hereunder shall be at locations that are easily and economically accessible to Utility equipment and personnel for construction and maintenance. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181

219

Data:B2671252-e078-4c16-b679-1cd78c204f7d | Open Energy Information  

Open Energy Info (EERE)

52-e078-4c16-b679-1cd78c204f7d 52-e078-4c16-b679-1cd78c204f7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 21L - Annexation Area - Single-Phase Service - Large Sector: Residential Description: (a) Available to members of the Cooperative for residential, farm, public building, commercial and industrial requiring single phase service or three phase service subject to the Cooperative's established rules and regulations and rates as established or as may from time to time be adopted by the seller.

220

Data:24053ce4-20dc-4227-811f-7bba01a7c4fb | Open Energy Information  

Open Energy Info (EERE)

ce4-20dc-4227-811f-7bba01a7c4fb ce4-20dc-4227-811f-7bba01a7c4fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wabash County Rural E M C Effective date: 2012/01/01 End date if known: Rate name: Rate Outdoor Security Lighting, Mercury, 175W Sector: Lighting Description: Availability Available when the security light can be mounted on a Wabash County REMC-owned pole. Security lighting service will only be rendered where in the opinion of Wabash County REMC; such lights are readily accessible for maintenance. Source or reference: http://www.wabashremc.com/wp-content/uploads/2012/01/Security-Light-Rate.pdf

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:Bef2d82a-31eb-4fde-8533-2d38bc6f7da3 | Open Energy Information  

Open Energy Info (EERE)

Bef2d82a-31eb-4fde-8533-2d38bc6f7da3 Bef2d82a-31eb-4fde-8533-2d38bc6f7da3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/06/01 End date if known: Rate name: Fuel Cost Recovery Schedule- Secondary Distribution Sector: Commercial Description: This schedule is applicable to and becomes a part of each retail rate schedule in which reference is mad to the Fuel Cost Recovery Schedule. This provision applies to both regular and minimum bills. Secondary Distribution Customers= Any customer not defined as a transmission or primary distribution customer.

222

Data:8ea3f8e7-837a-4fde-bf28-eb41f7f6c97a | Open Energy Information  

Open Energy Info (EERE)

e7-837a-4fde-bf28-eb41f7f6c97a e7-837a-4fde-bf28-eb41f7f6c97a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Government and Municipal Service (Street Lighting) MVFL 400W Customer owned Sector: Lighting Description: Applicable to municipalities and parishes for floodlighting by mercury vapor lamps where approved fixtures are furnished and maintained by the Municipality or Parish and mounted on bracket or mast arm on existing secondary system wood poles. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/ELL/ell_mvfl.pdf

223

Data:749fbfcb-a56a-4f98-b5f7-02d31b37af83 | Open Energy Information  

Open Energy Info (EERE)

fbfcb-a56a-4f98-b5f7-02d31b37af83 fbfcb-a56a-4f98-b5f7-02d31b37af83 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING,Metal Pole (kWh - 5, Consumers Per Light - 8) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

224

Data:1d928226-d715-44c7-86f7-abe9d5f00c02 | Open Energy Information  

Open Energy Info (EERE)

8226-d715-44c7-86f7-abe9d5f00c02 8226-d715-44c7-86f7-abe9d5f00c02 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sullivan, Illinois (Utility Company) Effective date: 2012/11/13 End date if known: Rate name: Commercial All Electric (Including Heat) - Year Round Rate: Single Phase - 250-500 kva installation Sector: Commercial Description: For customers with usage of less than twenty-five thousand (25,000) KWH per month and certain seasonal customers such as grain elevators and fertilizer plants. Source or reference: http://www.sullivanil.us/government.html Source Parent: Comments

225

Data:C9a0bd16-c187-4f9c-8746-aa99524f7a91 | Open Energy Information  

Open Energy Info (EERE)

bd16-c187-4f9c-8746-aa99524f7a91 bd16-c187-4f9c-8746-aa99524f7a91 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nashville Electric Service Effective date: 2012/06/01 End date if known: Rate name: OUTDOOR LIGHTING RATE--Part A Sector: Lighting Description: PART A--CHARGES FOR STREET AND PARK LIGHTING SYSTEMS, TRAFFIC SIGNAL SYSTEMS, AND ATHLETIC FIELD LIGHTING INSTALLATIONS The annual facility charge shall be 13 percent of the installed cost to Distributor's electric system of the facilities devoted to street and park lighting service specified in this Part A. Source or reference: http://www.nespower.com/documents/LSJune12.pdf

226

Data:D696c0f7-a829-41b4-a2b4-ee1249954159 | Open Energy Information  

Open Energy Info (EERE)

f7-a829-41b4-a2b4-ee1249954159 f7-a829-41b4-a2b4-ee1249954159 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 150W Overhead Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Open',Wood Pole (1)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

227

Data:Aa17853b-684a-49f7-bb79-d129f82996e7 | Open Energy Information  

Open Energy Info (EERE)

7853b-684a-49f7-bb79-d129f82996e7 7853b-684a-49f7-bb79-d129f82996e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2012/03/23 End date if known: Rate name: Electric Heating Schools Sector: Commercial Description: This tariff is withdrawn except for the present installations of customers receiving service hereunder at premises served prior to April 6, 1981. When new or upgraded facilities are required to maintain service to a Tariff E.H.S. customer, the customer shall be removed from Tariff E.H.S. and be required to take service under an appropriate general service tariff for which the customer qualifies.

228

Data:5f1a3406-1529-42bd-920f-7a5f64d34a78 | Open Energy Information  

Open Energy Info (EERE)

a3406-1529-42bd-920f-7a5f64d34a78 a3406-1529-42bd-920f-7a5f64d34a78 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Merced Irrigation District Effective date: 2010/01/01 End date if known: Rate name: SCHEDULE MEF FLAT RATE SERVICE-501 - 800 watts Sector: Commercial Description: APPLICABILITY: This schedule is applicable to small, constant, non-metered incidental loads for utilities, state agencies, and applicable special districts where the customer owns and maintains the equipment. Such loads would include: Path Lights Irrigation Controllers Cathodic Protection Stations Motor Radial Gates Pressure Point Automatic Watering Systems Traffic Counters Flashing Beacons Sign Illumination Monthly Usage: 166kWh

229

Data:E6c19a79-d570-41f7-9521-25e4d3c67467 | Open Energy Information  

Open Energy Info (EERE)

a79-d570-41f7-9521-25e4d3c67467 a79-d570-41f7-9521-25e4d3c67467 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: UL23 - MV 175W Sector: Lighting Description: AVAILABILITY This schedule is available to individual members located on the Cooperative's distribution system. Mercury vapor lights are only available at existing locations. RATE - MONTHLY All night outdoor lighting service using underground conductors and the Cooperative's standard lighting package equipment mounted on 30-foot Class 6, treated pine poles requiring 150 feet or less of secondary underground conductor.

230

Data:18b67ae7-387f-4115-9d9b-f22e119f7e24 | Open Energy Information  

Open Energy Info (EERE)

7ae7-387f-4115-9d9b-f22e119f7e24 7ae7-387f-4115-9d9b-f22e119f7e24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Rural El Coop Assn, Inc Effective date: 2009/08/01 End date if known: Rate name: Residential Rate: RURAL DOMESTIC SERVICE: Sector: Residential Description: Applicable to all single-phase farm and home consumers, schools, churches and community halls supplied through a single meter subject to the Cooperative's Rules and Regulations as they exist or may be amended from time to time. Source or reference: http://www.butler.coop/images/residential.pdf Source Parent: Comments

231

Coal - Analysis & Projections - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Released: December 19, 2013. The Annual Coal Distribution Report (ACDR) ... Released: September 27, 2012. Annual statistics on coal supply, demand, ...

232

Data:69f7c3a0-9fde-4abf-8677-3fb6c3beba68 | Open Energy Information  

Open Energy Info (EERE)

f7c3a0-9fde-4abf-8677-3fb6c3beba68 f7c3a0-9fde-4abf-8677-3fb6c3beba68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rocky Mount, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Schedule G15 Single Phase Sector: Industrial Description: Availability This Schedule is available for nonresidential service when the Customer's maximum metered demand is over 30 kW and use is seasonal, or varies greatly during the year. Service is considered seasonal when the metered demand for at least four consecutive months is less than 30% of the maximum metered demand in the preceding twelve months. Service will be supplied at a single point of delivery through one meter provided by the City to record use for monthly billing.

233

Data:9d1702e5-337e-409f-9675-9d6df9f0e3f7 | Open Energy Information  

Open Energy Info (EERE)

02e5-337e-409f-9675-9d6df9f0e3f7 02e5-337e-409f-9675-9d6df9f0e3f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule 7 - Industrial Sector: Lighting Description: Available to all commercial and industrial Members whose kilowatt demand shall exceed 500 kw for lighting and/or heating and/or power, and whose demand charges will track the wholesale power suppliers. Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

234

Data:0109c596-6643-48a2-b4ef-f7bedec5f60e | Open Energy Information  

Open Energy Info (EERE)

c596-6643-48a2-b4ef-f7bedec5f60e c596-6643-48a2-b4ef-f7bedec5f60e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule MDD - Medium Network General Service Sector: Commercial Description: Medium general service is general service provided to customers who have in the previous calendar year half or more than half of their normal billings at fifty (50) kW of maximum demand or greater and have more than half of their normal billings at less than one thousand (1,000) kW of maximum demand. Classification of new customers will be based on the Department's estimate of maximum demand in the current year.

235

Shipping Data Generation for the Hunter Valley Coal Chain  

E-Print Network (OSTI)

demand for coal is expected to double in the next decade. ... The Hunter Valley Coal Chain (HVCC) refers to the inland portion of the coal export supply chain.

236

Data:B2b16d4c-e798-40df-bf77-f7b6cdfcf357 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:B2b16d4c-e798-40df-bf77-f7b6cdfcf357 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sand Mountain Electric Coop Effective date: 2013/05/01 End date if known: Rate name: Schedule SGSD - Seasonal Demand and Energy Sector: Commercial Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

237

F7 Effects of Hub Contact Shape on Contact Pressure and Fatigue ...  

Science Conference Proceedings (OSTI)

Presentation Title, F7 Effects of Hub Contact Shape on Contact Pressure and ... or press-fitted shafts such as railway axles, rotor of a steam turbine or coupling, ... A23 Back Bead Characteristics during Butt Welding of Thick Plate for Various ...

238

Data:F56db83d-b034-41af-a4da-a91d395f7fdf | Open Energy Information  

Open Energy Info (EERE)

db83d-b034-41af-a4da-a91d395f7fdf db83d-b034-41af-a4da-a91d395f7fdf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bon Homme Yankton El Assn, Inc Effective date: 2012/05/01 End date if known: Rate name: Interruptible Sector: Commercial Description: * Coincident demand is $ 17.80. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

239

Data:9c367f59-e9da-4e4d-98f7-ff08e329ded7 | Open Energy Information  

Open Energy Info (EERE)

9-e9da-4e4d-98f7-ff08e329ded7 9-e9da-4e4d-98f7-ff08e329ded7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Pend Oreille Cnty Effective date: 2011/07/01 End date if known: Rate name: COMMERCIAL SERVICE 1 Single Phase Sector: Commercial Description: For all commercial, public, three-phase farm and industrial customers with estimated maximum demands of less than 500 kW for all uses, subject to the General Rules and Regulations. Source or reference: http://173.236.244.134/wp-content/uploads/2010/12/Electric-Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

240

Data:Ecd15029-6f7f-4e39-adf0-f628081d7c6d | Open Energy Information  

Open Energy Info (EERE)

Ecd15029-6f7f-4e39-adf0-f628081d7c6d Ecd15029-6f7f-4e39-adf0-f628081d7c6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2011/06/01 End date if known: Rate name: Schedule C1 - Large Industrial Rate Sector: Industrial Description: Applicable to contracts with demands of 500 to 4,999 KW with a monthly energy usage equal to or greater than 400 hours per KW of billing demand. These contracts will be two "two-party" contracts with the first one being between the Seller and the Cooperative association and the second one being between the Seller and the ultimate consumer.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:Ccf4438b-6d88-4b13-a758-06f7a6fc1ce1 | Open Energy Information  

Open Energy Info (EERE)

Ccf4438b-6d88-4b13-a758-06f7a6fc1ce1 Ccf4438b-6d88-4b13-a758-06f7a6fc1ce1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kiwash Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Medium STCO4 Contract Sector: Industrial Description: Available to qualifying customers at a location on the Kiwash system for power and energy through term contract. Minimum Billing Demand for this rate is 250 kW. Source or reference: ISU Sharepoint Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

242

Data:F8beffb5-847a-4ec4-add9-ff314f7f0b7a | Open Energy Information  

Open Energy Info (EERE)

beffb5-847a-4ec4-add9-ff314f7f0b7a beffb5-847a-4ec4-add9-ff314f7f0b7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Adel, Georgia (Utility Company) Effective date: End date if known: Rate name: Extra Large power Service Sector: Industrial Description: This Rate is applicable to all commercial or industrial electric service which is delivered or compensated to one standard voltage and where the following criteria are met: 1. Billing demand for the current month and the preceding 11 months must be greater than or equal to 5000 KW. 2.In the event that billing demand becomes permanently less than 5000 KW, the customer may switch the appropriate tariff.

243

Data:Cd4ce0c1-8973-492e-a967-3e0533be82f7 | Open Energy Information  

Open Energy Info (EERE)

c1-8973-492e-a967-3e0533be82f7 c1-8973-492e-a967-3e0533be82f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Single Phase Service Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

244

Data:4ac4719c-52f7-4dda-add9-46e6d8ce71e2 | Open Energy Information  

Open Energy Info (EERE)

c-52f7-4dda-add9-46e6d8ce71e2 c-52f7-4dda-add9-46e6d8ce71e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clarksdale Public Utilities Effective date: 2011/10/01 End date if known: Rate name: Lyon-Governmental Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

245

Data:6208511d-9635-4ca8-b4f7-21d038c208a5 | Open Energy Information  

Open Energy Info (EERE)

d-9635-4ca8-b4f7-21d038c208a5 d-9635-4ca8-b4f7-21d038c208a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: General Service Three Phase Sector: Commercial Description: To customers who reside within the city limits of Auburn, NE and do not qualify as a residential customer. Customer's service size is equal to or less than 200 amp connected capacity or their recorded demand is less than 100 kW for two consecutive months. Demand Charge initiate after 100 kW. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

246

Data:4d98bcf4-4ae0-456b-8643-45cb28f7ecc4 | Open Energy Information  

Open Energy Info (EERE)

8bcf4-4ae0-456b-8643-45cb28f7ecc4 8bcf4-4ae0-456b-8643-45cb28f7ecc4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule MDH-Medium Standard General Service: Shoreline(North City Undergrounding Charge) Sector: Residential Description: SCHEDULE MDH is for standard general service provided to City of Shoreline customers whose maximum demand is equal to or greater than 50 kW but less than 1,000 kW. Minimum Charge: 73.00¢ per meter per day (to be implemented when billing system can include it) Discounts: Transformer losses in kWh - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh Transformer investment - $0.26 per kW of monthly maximum demand.

247

Data:34d609c6-5296-43f7-9d28-b6df5f236513 | Open Energy Information  

Open Energy Info (EERE)

c6-5296-43f7-9d28-b6df5f236513 c6-5296-43f7-9d28-b6df5f236513 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern California Edison Co Effective date: 2013/05/16 End date if known: Rate name: GS-1 General Service Non-Demand Three Phase Above 50 kV but below 220 kV Discount Sector: Commercial Description: Applicable to single- and three-phase general service including lighting and power, except that the customer whose monthly maximum demand, in the opinion of SCE, is expected to exceed 20 kW or has exceeded 20 kW in any three months during the preceding 12 months is ineligible for service under this Schedule. Effective with the date of ineligibility of any customer served under this Schedule, the customer's account shall be transferred to Schedule GS-2. This Schedule is subject to meter availability.

248

Data:247fe347-4b9e-4e6b-b882-538717c412f7 | Open Energy Information  

Open Energy Info (EERE)

fe347-4b9e-4e6b-b882-538717c412f7 fe347-4b9e-4e6b-b882-538717c412f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2012/06/01 End date if known: Rate name: RESIDENTIAL TIME OF USE NON-DEMAND "R-TOU-ND" Sector: Residential Description: Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

249

Data:Df3ef3a1-86d0-4e10-9563-f7c58aa7fddd | Open Energy Information  

Open Energy Info (EERE)

ef3a1-86d0-4e10-9563-f7c58aa7fddd ef3a1-86d0-4e10-9563-f7c58aa7fddd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Murray, Kentucky (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Commercial- Large Demand Sector: Description: This rate shall apply to the firm power requirements (where a customer's contract demand is 5,000 kW or less) for electric service to commercial, industrial, and governmental customers, and to institutional customers including, without limitation, churches, clubs, fraternities, orphanages, nursing home, rooming or boarding houses, and like customers. This rate shall also apply to customers to whom service in not available under any other resale rate schedule.

250

Electric Utility Demand-Side Management 1997  

U.S. Energy Information Administration (EIA)

DOE/EIA-0589(97) Distribution Category UC-950 U.S. Electric Utility Demand-Side Management 1997 December 1998 Energy Information Administration Office of Coal ...

251

Demand Response  

NLE Websites -- All DOE Office Websites (Extended Search)

Peak load diagram Demand Response Demand Response (DR) is a set of time-dependent activities that reduce or shift electricity use to improve electric grid reliability, manage...

252

Demand Response  

NLE Websites -- All DOE Office Websites (Extended Search)

Peak load diagram Demand Response Demand response (DR) is a set of time-dependent activities that reduce or shift electricity use to improve electric grid reliability, manage...

253

Data:Edb2ca2c-9640-42fa-9ed1-f92b3b0f7c1b | Open Energy Information  

Open Energy Info (EERE)

Edb2ca2c-9640-42fa-9ed1-f92b3b0f7c1b Edb2ca2c-9640-42fa-9ed1-f92b3b0f7c1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Schedule I - Irrigation (3 phase) Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/38/Grand%20Elec%20Coop,%20INC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

254

Data:74258cd9-10c3-4200-904c-66220fd3e0f7 | Open Energy Information  

Open Energy Info (EERE)

4258cd9-10c3-4200-904c-66220fd3e0f7 4258cd9-10c3-4200-904c-66220fd3e0f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: Street Lighting: 250 Watt MV - Single/Steel Sector: Lighting Description: Customer provided Facilities and Cooperative Owned and Maintained Lighting Service. Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

255

Data:Ead6f7e6-926d-4600-8d1c-38285f2cd0c7 | Open Energy Information  

Open Energy Info (EERE)

Ead6f7e6-926d-4600-8d1c-38285f2cd0c7 Ead6f7e6-926d-4600-8d1c-38285f2cd0c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2012/01/01 End date if known: Rate name: Medium general service(high efficiency) Sector: Industrial Description: AVAILABILITY: At all locations for loads where the demand is at least 75 kW or more for three or more billing periods in a given calendar year, but less than 1,000 kW, and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be serve. Definition of Season: Summer months are June through September. Non-summer months are January through May and October through December.

256

Data:Df3a8629-ea2b-45c3-b32f-ae3e18fd1f7f | Open Energy Information  

Open Energy Info (EERE)

9-ea2b-45c3-b32f-ae3e18fd1f7f 9-ea2b-45c3-b32f-ae3e18fd1f7f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Large Power Time of Use (FP-TOU) Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

257

Data:9910e9da-d3dc-4dc7-b69a-3616121268f7 | Open Energy Information  

Open Energy Info (EERE)

e9da-d3dc-4dc7-b69a-3616121268f7 e9da-d3dc-4dc7-b69a-3616121268f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service above 200kW Demand 8am-8pm Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

258

Data:6c966115-f7e8-4a06-8f31-0c05cf590dbc | Open Energy Information  

Open Energy Info (EERE)

6115-f7e8-4a06-8f31-0c05cf590dbc 6115-f7e8-4a06-8f31-0c05cf590dbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Public Power District Effective date: 2013/01/01 End date if known: Rate name: Grain Bin Single Phase Rate 08 Sector: Commercial Description: Source or reference: http://www.butlerppd.com/common/New%20Customer%20Packet%20_1.2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

259

Data:7489ad60-5b9e-4b8f-80c6-04b434f7dfd3 | Open Energy Information  

Open Energy Info (EERE)

0-5b9e-4b8f-80c6-04b434f7dfd3 0-5b9e-4b8f-80c6-04b434f7dfd3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: Schedule "IM-7" Sector: Residential Description: Applicable to irrigation consumers requiring three-phase, both interruptible and non-interruptible service to irrigation pumps and pivot motors. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

260

Data:A32914f1-9df5-4f7b-ae2b-c60bdbaf6aff | Open Energy Information  

Open Energy Info (EERE)

f1-9df5-4f7b-ae2b-c60bdbaf6aff f1-9df5-4f7b-ae2b-c60bdbaf6aff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(SHOEBOX 100W HPS-Option E) Sector: Lighting Description: Customer-100% Cooperative-0% Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:4f862efe-a49a-404a-9d57-6f7c32eff00f | Open Energy Information  

Open Energy Info (EERE)

efe-a49a-404a-9d57-6f7c32eff00f efe-a49a-404a-9d57-6f7c32eff00f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City Utilities of Springfield Effective date: 2012/10/01 End date if known: 2013/10/01 Rate name: Large General Power Primary Sector: Description: Service under this rate shall be available within the corporate limits of the City of Springfield, Missouri, and the adjacent territory served by City Utilities for commercial and industrial customers with monthly demands of 300 kilowatts or greater, but less than 1,500 kilowatts. Availability is subject to the General Terms and Conditions Governing Electric Service and the Utility Service Rules and Regulations.

262

Data:7a100dd6-0f7c-4f02-ad3d-f3b1ab128602 | Open Energy Information  

Open Energy Info (EERE)

0dd6-0f7c-4f02-ad3d-f3b1ab128602 0dd6-0f7c-4f02-ad3d-f3b1ab128602 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 400 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

263

Data:03cc5c43-1aec-4f7a-b626-4adb3c57e035 | Open Energy Information  

Open Energy Info (EERE)

03cc5c43-1aec-4f7a-b626-4adb3c57e035 03cc5c43-1aec-4f7a-b626-4adb3c57e035 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: GS, Small Power TOU Sector: Commercial Description: Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

264

Data:D3b12d37-1b7a-4a81-b8ee-63ae33f7edbe | Open Energy Information  

Open Energy Info (EERE)

d37-1b7a-4a81-b8ee-63ae33f7edbe d37-1b7a-4a81-b8ee-63ae33f7edbe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 250 Watt (Enclosed) (Metal Hi Pole) 109 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

265

Data:35d6403f-7f01-4f91-8315-6193a29b0f90 | Open Energy Information  

Open Energy Info (EERE)

d6403f-7f01-4f91-8315-6193a29b0f90 d6403f-7f01-4f91-8315-6193a29b0f90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: Primary Control (1000 KVA) PC&PC5 Sector: Industrial Description: PC 5 AND PC Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01_final.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

266

Data:C14d37b8-45f7-405c-aaca-424965a093e6 | Open Energy Information  

Open Energy Info (EERE)

b8-45f7-405c-aaca-424965a093e6 b8-45f7-405c-aaca-424965a093e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(Private Area Light on existing Pole 150W P.A.L-Option E) Sector: Lighting Description: Customer-100% Cooperative-0% There is an additional Charge of $0.13 for the service on new Pole(wood). Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

267

Data:Ef530280-360e-459e-9db3-3047f7fac022 | Open Energy Information  

Open Energy Info (EERE)

360e-459e-9db3-3047f7fac022 360e-459e-9db3-3047f7fac022 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Cp-1 Small Power Service between 40kW and 200kW Demand Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

268

Data:5e8d216a-61a3-4935-837c-8b0b08f7a4e0 | Open Energy Information  

Open Energy Info (EERE)

6a-61a3-4935-837c-8b0b08f7a4e0 6a-61a3-4935-837c-8b0b08f7a4e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Indiana R E M C Effective date: 2010/05/01 End date if known: Rate name: SECURITY LIGHTING SERVICES: 250W High Pressure Sodium (directional) Sector: Lighting Description: Dusk till Dawn Lighting Service. This rate applies to the equivalent Ornamental Lighting Service. Source or reference: http://www.seiremc.com/2006/rate_sch/2010/SLSecurityLightingService-5-1-10.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

269

Data:5974ff00-6f7d-490e-86d4-22248cbd591b | Open Energy Information  

Open Energy Info (EERE)

f7d-490e-86d4-22248cbd591b f7d-490e-86d4-22248cbd591b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day with Parallel Generation(20kW or less) Sector: Industrial Description: This rate is optional to Cp-1, Small Power Service customers if their consumption exceeds 40,000 kWh and their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

270

Data:44dd8ad3-f7f8-4deb-9baf-e143ed79ac2f | Open Energy Information  

Open Energy Info (EERE)

44dd8ad3-f7f8-4deb-9baf-e143ed79ac2f 44dd8ad3-f7f8-4deb-9baf-e143ed79ac2f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: Commercial Outdoor Lighting HPS 150 W Sector: Lighting Description: Source or reference: http://www.tcec.com/myBusiness/generalSinglePhaseService.aspx Source Parent: http://www.tcec.com Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

271

Data:Da49a4f7-b301-48a0-b0fc-c609e508c65a | Open Energy Information  

Open Energy Info (EERE)

f7-b301-48a0-b0fc-c609e508c65a f7-b301-48a0-b0fc-c609e508c65a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - RSL(A) Sector: Lighting Description: 6 or more consumers per light with a lamp size of 7000 lumens Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments 6 kWh/month estimate. $1.20 fixed monthly is per customer. Plus current month's Power Cost Adjustment and applicable taxes. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

272

Data:180fc7f7-eea4-4bf8-bcba-d1e21a159c8e | Open Energy Information  

Open Energy Info (EERE)

f7-eea4-4bf8-bcba-d1e21a159c8e f7-eea4-4bf8-bcba-d1e21a159c8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 5,000kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount (above 15,000 volts) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

273

Data:Ca419ec1-3507-4c5e-bca1-408d35e587f7 | Open Energy Information  

Open Energy Info (EERE)

ec1-3507-4c5e-bca1-408d35e587f7 ec1-3507-4c5e-bca1-408d35e587f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Lighting Service 150 Watt HPS Sector: Lighting Description: *It is cooperative owned, operated and maintained. Subject to tax and wholesale power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_OL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

274

Data:4d9970dd-dbe9-45e6-8175-675d6e487f7c | Open Energy Information  

Open Energy Info (EERE)

dbe9-45e6-8175-675d6e487f7c dbe9-45e6-8175-675d6e487f7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City Utilities of Springfield Effective date: 2012/10/01 End date if known: 2013/10/01 Rate name: Interruptible Power Secondary Sector: Description: Service under this rate shall be available within the corporate limits of the City of Springfield, Missouri, and the adjacent territory served by City Utilities for commercial and industrial customers with monthly demands of 1,500 kilowatts or greater. Service under this rate schedule is interruptible and customers must agree to interrupt electric service as provided under special contract with City Utilities. Availability is subject to the General Terms and Conditions Governing Electric Service and the Utility Service Rules and Regulations.

275

Data:2f122301-5f7e-4170-99c6-bd351321ee3e | Open Energy Information  

Open Energy Info (EERE)

1-5f7e-4170-99c6-bd351321ee3e 1-5f7e-4170-99c6-bd351321ee3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Franklin County Effective date: 2008/05/01 End date if known: Rate name: SMALL COMMERCIAL GENERAL SERVICE RATE SCHEDULE NO. 2.0 Sector: Commercial Description: Service under this schedule shall be available throughout the service area of the District for lighting and power to commercial, industrial, public buildings, and other services not eligible under other rate schedules where measured demand is less than 50 kW at least 10 times during any calendar year. Source or reference: http://www.franklinpud.com/pdfs/Rate2-2008.pdf

276

Data:C3d972d3-fa2b-4d27-9898-677f7ba3f85a | Open Energy Information  

Open Energy Info (EERE)

2d3-fa2b-4d27-9898-677f7ba3f85a 2d3-fa2b-4d27-9898-677f7ba3f85a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Spring Grove, Minnesota (Utility Company) Effective date: 2012/06/05 End date if known: Rate name: Commercial- Single-Phase Sector: Commercial Description: Source or reference: http://www.springgrove.govoffice.com/vertical/sites/%7BF9DAB398-3ED2-4F76-ADAA-FADAB2BA2D32%7D/uploads/Chapter_105_-_Electric_Rates_2012.xlsx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

277

Data:047df0f7-cb38-4f84-a0dc-6f64c2fe414d | Open Energy Information  

Open Energy Info (EERE)

f7-cb38-4f84-a0dc-6f64c2fe414d f7-cb38-4f84-a0dc-6f64c2fe414d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Schedule L - 250W HPS Flood Sector: Commercial Description: Source or reference: http://www.nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

278

Data:92f64ea9-3dc7-49f7-8c28-149450a0f22f | Open Energy Information  

Open Energy Info (EERE)

ea9-3dc7-49f7-8c28-149450a0f22f ea9-3dc7-49f7-8c28-149450a0f22f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NH Effective date: 2012/01/01 End date if known: Rate name: 100W HIGH PRESSURE SODIUM LAMP Sector: Lighting Description: Source or reference: http://www.nu.com/PSNHTariffPDFs/tariff070107.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

279

Data:9f6f7b4a-a1af-4c02-ad9b-11643c41bbdb | Open Energy Information  

Open Energy Info (EERE)

f7b4a-a1af-4c02-ad9b-11643c41bbdb f7b4a-a1af-4c02-ad9b-11643c41bbdb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Self Consumed: S1PO Sector: Commercial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

280

Data:Bb460e8b-8bcc-4813-8bab-14b5f7d9de60 | Open Energy Information  

Open Energy Info (EERE)

60e8b-8bcc-4813-8bab-14b5f7d9de60 60e8b-8bcc-4813-8bab-14b5f7d9de60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: GS-1 Sector: Commercial Description: To electric service of one standard voltage required on the consumer's premises delivered at one point and metered at or compensated to that voltage, but not for the purpose of irrigation. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:Ec5dff50-cfcf-4d17-9cad-da1869e0b6f7 | Open Energy Information  

Open Energy Info (EERE)

0-cfcf-4d17-9cad-da1869e0b6f7 0-cfcf-4d17-9cad-da1869e0b6f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Shoebox/Flood MH 400 W w/ Aid Sector: Lighting Description: * Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

282

Data:4cc0f1c4-b78b-45f7-b32a-1a147b8927e1 | Open Energy Information  

Open Energy Info (EERE)

cc0f1c4-b78b-45f7-b32a-1a147b8927e1 cc0f1c4-b78b-45f7-b32a-1a147b8927e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand River Dam Authority Effective date: 2011/07/01 End date if known: Rate name: wholesale rate power for resale Sector: Commercial Description: Source or reference: http://www.grda.com/electric/customer-service/wholesale-sales/power-rate-for-resale/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

283

Data:C581c31f-7cf2-47ad-b0e7-7e59adde7fce | Open Energy Information  

Open Energy Info (EERE)

1f-7cf2-47ad-b0e7-7e59adde7fce 1f-7cf2-47ad-b0e7-7e59adde7fce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Interruptible Industrial Service Sector: Industrial Description: In all rate areas, with the cooperative reserving the right to remove this rate schedule or modify it in any manner. Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

284

Data:04f73963-bdfe-445f-8a50-7c0d094f7df0 | Open Energy Information  

Open Energy Info (EERE)

-bdfe-445f-8a50-7c0d094f7df0 -bdfe-445f-8a50-7c0d094f7df0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 7am-9pm Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

285

Data:631ffb0c-ca6b-48eb-aae7-f7d43496f860 | Open Energy Information  

Open Energy Info (EERE)

ffb0c-ca6b-48eb-aae7-f7d43496f860 ffb0c-ca6b-48eb-aae7-f7d43496f860 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cobb Electric Membership Corp Effective date: 2006/01/01 End date if known: Rate name: Outdoor Lighting Overhead Service HPS 150 W RW Pole Contribution Paid Sector: Lighting Description: Pole Contributions Wood 30' $246.00 Wood 35' $297.00 Wood 40' $382.00 Wood 45' $424.00 Source or reference: https://www.cobbemc.com/~/media/Files/CEMC/PDFs/2012%20PDF/233%20Lighting%20Rates%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

286

Data:8ffc62a9-322b-4520-88c7-59f7a6309634 | Open Energy Information  

Open Energy Info (EERE)

a9-322b-4520-88c7-59f7a6309634 a9-322b-4520-88c7-59f7a6309634 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 100 (Decorative Underground) HPS 48 kWh Outdoor Lighting Sector: Lighting Description: Source or reference: http://psc.ky.gov/tariffs/Electric/Salt%20River%20Electric%20Coop.%20Corp/Tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

287

Data:Df79bc06-4de2-4f7d-8e01-1dd479660ca0 | Open Energy Information  

Open Energy Info (EERE)

Df79bc06-4de2-4f7d-8e01-1dd479660ca0 Df79bc06-4de2-4f7d-8e01-1dd479660ca0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Flood Lights 400 W MVL Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

288

Data:72c9798c-7c45-46f7-8b63-e320fac7c7bb | Open Energy Information  

Open Energy Info (EERE)

798c-7c45-46f7-8b63-e320fac7c7bb 798c-7c45-46f7-8b63-e320fac7c7bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wright-Hennepin Coop Elec Assn Effective date: 2010/08/01 End date if known: Rate name: Overhead Safety and Security, 100 Watt HPS Sector: Lighting Description: Source or reference: www.whe.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

289

Data:E28e6bfe-87d6-400f-9186-8f7f5d8f1517 | Open Energy Information  

Open Energy Info (EERE)

7d6-400f-9186-8f7f5d8f1517 7d6-400f-9186-8f7f5d8f1517 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

290

Data:B3e71417-deab-4717-b670-cb9f7b724a0a | Open Energy Information  

Open Energy Info (EERE)

417-deab-4717-b670-cb9f7b724a0a 417-deab-4717-b670-cb9f7b724a0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2011/03/01 End date if known: Rate name: RIDER I INTERRUPTIBLE CONTRACT SERVICE Sector: Commercial Description: Availability: This Rider is applicable to service supplied and metered at a single voltage and delivery point where 100kW or greater is subject to disconnection by the utility under the terms and conditions as set forth in the contract agreement. This Rider shall be closed to new customers after February 28, 2011. Rates: Reduction in demand charge as set forth in a contract between the customer and the utility and approved by the public utilities commission.

291

Data:6d038a5a-3c42-4a8c-bd4f-986f7b360753 | Open Energy Information  

Open Energy Info (EERE)

a-3c42-4a8c-bd4f-986f7b360753 a-3c42-4a8c-bd4f-986f7b360753 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: HPS-Cobra - DOT 10' Mast Sector: Residential Description: Fixed Monthly Charge= Energy Rate+ Maintenance Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

292

Data:31688026-8c44-4f7e-aab8-1f0d08027578 | Open Energy Information  

Open Energy Info (EERE)

26-8c44-4f7e-aab8-1f0d08027578 26-8c44-4f7e-aab8-1f0d08027578 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Service-HPS 70 watts (T) Sector: Lighting Description: This rate is available to any customer for non-metered outdoor lighting service. Source or reference: http://www.mainepublicservice.com/media/40542/rate%20t%20010112.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

293

Data:88d7a8f7-1b42-45c9-a421-bd48a0722dbf | Open Energy Information  

Open Energy Info (EERE)

a8f7-1b42-45c9-a421-bd48a0722dbf a8f7-1b42-45c9-a421-bd48a0722dbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hartford Electric Effective date: 2005/07/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand Primary Metering Discount (primary side of transformer) with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0452 per kilowatt-hour.

294

Data:Df39a13d-62bc-46fe-9afa-f7d1630dd586 | Open Energy Information  

Open Energy Info (EERE)

Df39a13d-62bc-46fe-9afa-f7d1630dd586 Df39a13d-62bc-46fe-9afa-f7d1630dd586 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipmont Rural Elec Member Corp Effective date: 2012/08/22 End date if known: Rate name: SCHEDULE 8: Large Power Service Sector: Commercial Description: 1. AVAILABILITY Available to any member of Tipmont Rural Electric Membership Corporation (REMC) for general power service with a demand of 50 kW or more and is located adjacent to an electric transmission or distribution line of the REMC that is adequate and suitable for supplying required service. This schedule is not available for supplemental or standby service. 2. CHARACTER OF SERVICE Service rendered under this schedule shall be alternating current, 60 Hertz, single or multi-phase, at a mutually agreeable voltage.

295

Data:06450abf-b78c-4fb4-b7e7-9d1dbca047f7 | Open Energy Information  

Open Energy Info (EERE)

abf-b78c-4fb4-b7e7-9d1dbca047f7 abf-b78c-4fb4-b7e7-9d1dbca047f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: LGT01-189 Sector: Commercial Description: Incandescent: only available at existing locations with existing fixtures Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01_final.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

296

Data:335246e0-8fa9-4a5a-bef1-1f7a7381ea70 | Open Energy Information  

Open Energy Info (EERE)

e0-8fa9-4a5a-bef1-1f7a7381ea70 e0-8fa9-4a5a-bef1-1f7a7381ea70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

297

Data:318d15bd-2f0d-47be-af7d-fb8f7d17db80 | Open Energy Information  

Open Energy Info (EERE)

bd-2f0d-47be-af7d-fb8f7d17db80 bd-2f0d-47be-af7d-fb8f7d17db80 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 400 Watt (Enclosed) (Metal Hi Pole) 164 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

298

Data:4fec0c40-b44b-4f7e-9883-bdc99ccff4fd | Open Energy Information  

Open Energy Info (EERE)

fec0c40-b44b-4f7e-9883-bdc99ccff4fd fec0c40-b44b-4f7e-9883-bdc99ccff4fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Yard Lighting HPS 250 W Non-Metered Sector: Lighting Description: *Subject to production cost adjustment. Pole rental for lights/equipment = $1.30 Source or reference: http://www.ci.gothenburg.ne.us/Ordinances/2010_Current/868%20Utility%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

299

Data:F09c66e9-260d-43f2-b321-8dadf0d50f7e | Open Energy Information  

Open Energy Info (EERE)

c66e9-260d-43f2-b321-8dadf0d50f7e c66e9-260d-43f2-b321-8dadf0d50f7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 2005/06/01 End date if known: Rate name: SCHEDULE ILG-2 INCREMENTAL LOAD GROWTH SERVICE Sector: Commercial Description: Applicable to new consumers connected after December 31, 2004 where the connected load is 900 kW or greater and to consumers moving to this rate from Schedule ILG-1. Electric service of one standard voltage will be delivered at one point and metered at or compensated to that voltage. Applicable also to new or incremental load added by existing consumers after December 31, 2004, provided that such new load is added in increments of not less than 500 kW measured demand.

300

Data:A842d6db-05f7-4879-9df9-df5a0c45874e | Open Energy Information  

Open Energy Info (EERE)

d6db-05f7-4879-9df9-df5a0c45874e d6db-05f7-4879-9df9-df5a0c45874e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Forest Grove, Oregon (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: LARGE COMMERCIAL SERVICE Sector: Commercial Description: Heavy Load Hours=4.08¢/kWh Light Load Hours=3.39¢/kWh Note: Heavy Load Hours (HLH) are from 6:00 a.m. to 10:00 p.m. Monday through Saturday. Light Load Hours (LLH) are all other times. Source or reference: http://www.forestgrove-or.gov/city-hall/light-a-power-service-rates.html Source Parent: Comments Applicability Demand (kW)

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:67ee4f7d-be55-4a3a-a465-e978197bee1f | Open Energy Information  

Open Energy Info (EERE)

f7d-be55-4a3a-a465-e978197bee1f f7d-be55-4a3a-a465-e978197bee1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bailey County Elec Coop Assn Effective date: 2004/03/01 End date if known: Rate name: Irrigation Sep to Mar Sector: Industrial Description: Facilities Charge of $25.00 per meter per year in 12-monthly installments is represented by the Fixed Monthly Charge of $2.08 per month, $25.00 divided by 12 months. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

302

Data:E363c6e0-0534-4407-93dd-cb9f7d0c3a7a | Open Energy Information  

Open Energy Info (EERE)

e0-0534-4407-93dd-cb9f7d0c3a7a e0-0534-4407-93dd-cb9f7d0c3a7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 150W METAL HALIDE COACH LANTERN Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

303

Data:6db9d1bb-d4fc-403c-9fa6-f7ac25a5b07c | Open Energy Information  

Open Energy Info (EERE)

db9d1bb-d4fc-403c-9fa6-f7ac25a5b07c db9d1bb-d4fc-403c-9fa6-f7ac25a5b07c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Small Commercial Service- Single Phase (E1) Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

304

Data:C490a6a9-9f7e-4888-9484-26725d43c524 | Open Energy Information  

Open Energy Info (EERE)

a9-9f7e-4888-9484-26725d43c524 a9-9f7e-4888-9484-26725d43c524 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount (2,300-15,000 volts) with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

305

Data:De14353b-541f-4378-a028-64bbb8f7d7e6 | Open Energy Information  

Open Energy Info (EERE)

4353b-541f-4378-a028-64bbb8f7d7e6 4353b-541f-4378-a028-64bbb8f7d7e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service between 1,000kW and 5,000 kW Demand 7am-9pm Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

306

Data:Fda6ebc1-80b7-47b9-81ae-5f7ae77f39ed | Open Energy Information  

Open Energy Info (EERE)

Fda6ebc1-80b7-47b9-81ae-5f7ae77f39ed Fda6ebc1-80b7-47b9-81ae-5f7ae77f39ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Coop Owns Memb Repairs HPS 250 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

307

Data:F23ebff3-2206-42f7-8f4a-b7956ec4baa8 | Open Energy Information  

Open Energy Info (EERE)

ebff3-2206-42f7-8f4a-b7956ec4baa8 ebff3-2206-42f7-8f4a-b7956ec4baa8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Gs-2 General Service Optional Time-of-Day Three Phase less than 50kW Demand 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

308

Data:12a72f65-3385-4f7c-ab20-1355dd6f6a6b | Open Energy Information  

Open Energy Info (EERE)

-3385-4f7c-ab20-1355dd6f6a6b -3385-4f7c-ab20-1355dd6f6a6b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2008/10/01 End date if known: Rate name: Outdoor Lighting HPS Underground Flood 400 W Sector: Lighting Description: Assuming Existing Pole Source or reference: http://www.tri-countyemc.com/skins/userfiles/file/Outdoor_lighting_1_2_3.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

309

Data:624b23b8-fe68-4a35-be4a-87d1e24f7afc | Open Energy Information  

Open Energy Info (EERE)

24b23b8-fe68-4a35-be4a-87d1e24f7afc 24b23b8-fe68-4a35-be4a-87d1e24f7afc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: RNY-2A (Zone E Blended) Sector: Commercial Description: Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

310

Data:8c8d561d-366b-4996-9e0f-f7ec1c65e492 | Open Energy Information  

Open Energy Info (EERE)

1d-366b-4996-9e0f-f7ec1c65e492 1d-366b-4996-9e0f-f7ec1c65e492 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Princeton Public Utils Comm Effective date: 2010/02/01 End date if known: Rate name: 100W High Pressure Sodium Sector: Lighting Description: For year-round illumination for area and security lighting by electric lamps in luminaries supported on wood poles, where the facilities for the service are furnished by the utility. Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

311

Data:Fa8d7369-01c1-40c6-95f7-cf0f091787bc | Open Energy Information  

Open Energy Info (EERE)

Fa8d7369-01c1-40c6-95f7-cf0f091787bc Fa8d7369-01c1-40c6-95f7-cf0f091787bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: La Plata Electric Assn, Inc Effective date: 2012/01/01 End date if known: Rate name: TOU Small Commercial Single Phase Pre-Paid Sector: Commercial Description: winter: Sept.15 - May 14(one peak:6am-11am and 5pm-10om,offpeak:11am-5pm,10pm-6am) summer: May 15 - Sept.14(onpeak:10am-10pm, offpeak:10pm-10am and weekend all) Source or reference: http://www.lpea.com/pdf/rates/2012ratesum.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

312

Data:3aa9f7d6-5452-4851-a6fd-85ea0c474051 | Open Energy Information  

Open Energy Info (EERE)

f7d6-5452-4851-a6fd-85ea0c474051 f7d6-5452-4851-a6fd-85ea0c474051 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

313

Data:6bd55fc9-c3f7-4542-bcab-545f8eda261c | Open Energy Information  

Open Energy Info (EERE)

bd55fc9-c3f7-4542-bcab-545f8eda261c bd55fc9-c3f7-4542-bcab-545f8eda261c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Lansdale, Pennsylvania (Utility Company) Effective date: 2013/01/16 End date if known: Rate name: Outdoor Lighting 175 W Sector: Lighting Description: Source or reference: http://www.lansdale.org/vertical/Sites/%7B862B0D24-07B5-47AF-8DA9-6A7934A26ACB%7D/uploads/Motion_F_Res._13-02_revise_electric_rates_fees_etc._1.16.13.pdf Source Parent: http://www.lansdale.org Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

314

Data:4179a0c9-400f-477e-8b38-810f7c3ac113 | Open Energy Information  

Open Energy Info (EERE)

4179a0c9-400f-477e-8b38-810f7c3ac113 4179a0c9-400f-477e-8b38-810f7c3ac113 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: Commercial Outdoor Lighting MHF 400 W Sector: Lighting Description: Source or reference: http://www.tcec.com/myBusiness/generalSinglePhaseService.aspx Source Parent: http://www.tcec.com Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

315

Data:97a4779f-7d2d-45bb-a6ac-4e366ca81827 | Open Energy Information  

Open Energy Info (EERE)

79f-7d2d-45bb-a6ac-4e366ca81827 79f-7d2d-45bb-a6ac-4e366ca81827 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Union City, Tennessee (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Commercial- GSA-2 Sector: Commercial Description: (51-1000 kW) Source or reference: http://www.uces.org/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

316

Data:58855357-f7a4-4edb-a876-c3ce3b84196b | Open Energy Information  

Open Energy Info (EERE)

f7a4-4edb-a876-c3ce3b84196b f7a4-4edb-a876-c3ce3b84196b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: Electric Process Heating < 4.8 kV secondary - 11,501 - 41,500 kWh Sector: Industrial Description: Source or reference: www.dteenergy.com/pdfs/detroitEdisonTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

317

Data:F762fb8f-7b7c-48a1-a618-280fb34250bc | Open Energy Information  

Open Energy Info (EERE)

62fb8f-7b7c-48a1-a618-280fb34250bc 62fb8f-7b7c-48a1-a618-280fb34250bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cobb Electric Membership Corp Effective date: 2006/01/01 End date if known: Rate name: Outdoor Lighting Overhead Service HPS 400 W FL Pole Contribution Not Paid Sector: Lighting Description: Pole Contributions Wood 30' $246.00 Wood 35' $297.00 Wood 40' $382.00 Wood 45' $424.00 Source or reference: https://www.cobbemc.com/~/media/Files/CEMC/PDFs/2012%20PDF/233%20Lighting%20Rates%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

318

Data:D676f7d1-9798-43e6-95f4-7a2b59008f38 | Open Energy Information  

Open Energy Info (EERE)

f7d1-9798-43e6-95f4-7a2b59008f38 f7d1-9798-43e6-95f4-7a2b59008f38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 05 - 16,000 Lumens 150 Watt high pressure sodium unmetered Sector: Lighting Description: Available to metered and unmetered street lighting, security lighting and traffic lighting. Source or reference: www.cceci.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

319

Data:Eeab2a02-8727-45f7-9819-17e4ccdcab0b | Open Energy Information  

Open Energy Info (EERE)

Eeab2a02-8727-45f7-9819-17e4ccdcab0b Eeab2a02-8727-45f7-9819-17e4ccdcab0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 37 - Intermediate Time-of-Day General Electric Service (Bundled Service Primary Metering Discount) Sector: Commercial Description: AVAILABLE for the electrical requirements where the customer's maximum demand is equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 200 kW but less than 350 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters.

320

Data:66eced61-99d6-47d5-80e1-a4b608fb52f7 | Open Energy Information  

Open Energy Info (EERE)

eced61-99d6-47d5-80e1-a4b608fb52f7 eced61-99d6-47d5-80e1-a4b608fb52f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:70d94ae9-f7a4-436e-9241-36d5f1dc4efb | Open Energy Information  

Open Energy Info (EERE)

ae9-f7a4-436e-9241-36d5f1dc4efb ae9-f7a4-436e-9241-36d5f1dc4efb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2013/01/01 End date if known: Rate name: CONSUMER OWNED STREET LIGHTING Mercury Vapor 400 Sector: Lighting Description: CONSUMER OWNED SYSTEM OPERATED BY DISTRICT Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

322

Data:Ede26779-3318-41a7-b34c-f7dd4ee7985a | Open Energy Information  

Open Energy Info (EERE)

Ede26779-3318-41a7-b34c-f7dd4ee7985a Ede26779-3318-41a7-b34c-f7dd4ee7985a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Medium Commercial General Service Single-Phase Sector: Commercial Description: Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/10/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

323

Data:8568e73b-ae2d-424f-a21f-7fd777938aa4 | Open Energy Information  

Open Energy Info (EERE)

b-ae2d-424f-a21f-7fd777938aa4 b-ae2d-424f-a21f-7fd777938aa4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Gs-2 General Service Optional Time-of-Day Single Phase less than 50kW Demand 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

324

Data:B19b075e-f9f7-4fb5-9545-1eddfdcc009c | Open Energy Information  

Open Energy Info (EERE)

e-f9f7-4fb5-9545-1eddfdcc009c e-f9f7-4fb5-9545-1eddfdcc009c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(Private Area Light on existing Pole 200W P.A.L-Option E) Sector: Lighting Description: Customer-100% Cooperative-0% There is an additional Charge of $0.1 for the service on new Pole(wood) Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

325

Data:Fe4b848d-7e6c-48f7-a6fb-1829e55b4817 | Open Energy Information  

Open Energy Info (EERE)

b848d-7e6c-48f7-a6fb-1829e55b4817 b848d-7e6c-48f7-a6fb-1829e55b4817 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 100 Watt HPS- Cobra Head Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

326

Data:0e824466-e6e7-46e3-906f-3aacb77f51f7 | Open Energy Information  

Open Energy Info (EERE)

6-e6e7-46e3-906f-3aacb77f51f7 6-e6e7-46e3-906f-3aacb77f51f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Schedule L - 100W HPS Sector: Commercial Description: Source or reference: http://www.nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

327

Data:215e014a-e214-4bbb-b23b-916062a3d0f7 | Open Energy Information  

Open Energy Info (EERE)

4a-e214-4bbb-b23b-916062a3d0f7 4a-e214-4bbb-b23b-916062a3d0f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Midwest Energy Inc Effective date: 2012/06/29 End date if known: Rate name: FSLS-HPS 150 Watt 59 kWh Sector: Lighting Description: Source or reference: http://www.mwenergy.com/elecrate.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

328

Data:7f281dd1-f7f5-4fbb-b8f4-439ebec549d8 | Open Energy Information  

Open Energy Info (EERE)

1dd1-f7f5-4fbb-b8f4-439ebec549d8 1dd1-f7f5-4fbb-b8f4-439ebec549d8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Street Lighting (SL) Rate 189 Watt Incandescent Sector: Lighting Description: For municipal street lighting on city-accepted streets. Source or reference: https://www.burlingtonelectric.com/ELBO/assets/Tariff%20Sheets%20June%20262009%20revised-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

329

Data:E741e320-8ff8-49c7-addb-494aa35da0f7 | Open Energy Information  

Open Energy Info (EERE)

1e320-8ff8-49c7-addb-494aa35da0f7 1e320-8ff8-49c7-addb-494aa35da0f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Small Agricultural Irrigation Sector: Commercial Description: Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/18/ Source Parent: Comments Facilities charge is $6.74 per horsepower, per season payable at the beginning of irrigation season. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

330

Data:0c99129d-a91c-4e59-927e-f7e996a19666 | Open Energy Information  

Open Energy Info (EERE)

d-a91c-4e59-927e-f7e996a19666 d-a91c-4e59-927e-f7e996a19666 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: General Service (Small)Single Phase GS-1 Sector: Commercial Description: Source or reference: http://www.subutil.com/files/static_page_files/A6CFDCA3-94A4-7DCF-40A67DECC1D04974/201204SUBElec.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

331

Data:581cc914-e376-4fa3-b2f7-7d3c47e10ce1 | Open Energy Information  

Open Energy Info (EERE)

4-e376-4fa3-b2f7-7d3c47e10ce1 4-e376-4fa3-b2f7-7d3c47e10ce1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jump River Electric Coop Inc Effective date: 2012/06/01 End date if known: Rate name: Dusk to Dawn Lighting- Unmetered Rental Sector: Lighting Description: Power Cost Adjustment (PCA): $0.008/kWh Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

332

Data:5f2d2b61-7870-45f7-a37b-b3dfd122648d | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:5f2d2b61-7870-45f7-a37b-b3dfd122648d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 3 - 25kW or more NSS (Non-Retail) Subtransmission Voltage Sector: Industrial Description: APPLICABLE TO THE USE OF SERVICE FOR: Primary Service for any customer with a demand of 25 kilowatts or more but less than 500 kilowatts. Flat rate Adjustments = Transition Charge+MFC. Reactive Charge: $0.00078/kWh.

333

Data:3342f0a0-e7c1-42ff-bcfd-e8f7e28a9000 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:3342f0a0-e7c1-42ff-bcfd-e8f7e28a9000 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florida Power & Light Co. Effective date: 2013/09/01 End date if known: Rate name: MET - Metrorail Sector: Commercial Description: For electric service to MEtropolitan Dade County Electric Transit System at each point of delivery required for the operation fo an electric transit system on continuous and contiguous rights-of-way. Source or reference: www.fpl.com/rates Source Parent: Comments Applicability Demand (kW)

334

Data:87e6c12c-e2fe-4f7a-8898-99d55a79409f | Open Energy Information  

Open Energy Info (EERE)

c12c-e2fe-4f7a-8898-99d55a79409f c12c-e2fe-4f7a-8898-99d55a79409f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arizona Public Service Co Effective date: 2010/01/01 End date if known: Rate name: EXTRA SMALL GENERAL SERVICE (0 kW - 20 kW) RATE SCHEDULE E-32 XS Primary Voltage Sector: Commercial Description: This rate schedule is available in all territory served by the Company at all points where facilities of adequate capacity and the required phase and suitable voltage are adjacent to the sites served. This rate schedule is applicable to all Standard Offer and Direct Access customers whose Average Monthly Maximum Demand is 20 kW per month or less. The Company initially will place the Customer on the applicable Rate Schedule E-32 XS, E-32 S, E-32 M, or E-32 L based on the Average Monthly Maximum Demand, as determined by the Company. The Customer will be billed on Schedule E-32 S or E-32 XS depending on the Monthly Maximum Demand for each billing cycle. Service must be supplied at one point of delivery and measured through one meter unless otherwise specified by an individual customer contract. Rate selection is subject to paragraphs 3.2 through 3.5 of the Company's Schedule 1, Terms and Conditions for Standard Offer and Direct Access Services. This schedule is not applicable to breakdown, standby, supplemental, residential or resale service.

335

Data:Bd88814b-f7ed-48c8-8061-3ad3cac6c7b8 | Open Energy Information  

Open Energy Info (EERE)

8814b-f7ed-48c8-8061-3ad3cac6c7b8 8814b-f7ed-48c8-8061-3ad3cac6c7b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: ALTERNATIVE PRIMARY SUPPLY SERVICE D6.1 TRANSMISSION-120 kV AND ABOVE (Retail Access) Sector: Description: Demand charge per kW of Max Demand. Available to customers desiring service at primary, subtransmission, or transmission voltage who contract for a specified capacity of not less than 10,000 kilowatts at a single location. HOURS OF SERVICE: 24 hours, subject to interruption by agreement, or by advance notice. CURRENT, PHASE AND VOLTAGE: Alternating current, three-phase, nominally at 4,800, 13,200, 24,000, 41,570 or 120,000 volts at the option of the Company. CONTRACT CAPACITY: Customers shall contract for a specified capacity in kilowatts sufficient to meet normal maximum requirements but not less than 10,000 kilowatts. The Company undertakes to provide the necessary facilities for a supply of electric power from its primary distribution system at the contract capacity. Any single reading of the demand meter in any month that exceeds the contract capacity then in effect shall become the new contract capacity. The contract capacity for customers served at more than one voltage level shall be the sum of the contract capacities established for each voltage level.

336

Data:26822b5e-f7d4-41b9-af0c-4cb3d47d9ae8 | Open Energy Information  

Open Energy Info (EERE)

f7d4-41b9-af0c-4cb3d47d9ae8 f7d4-41b9-af0c-4cb3d47d9ae8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gering, Nebraska (Utility Company) Effective date: 2012/09/24 End date if known: Rate name: Rural Residential Rate Three Phase Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

337

Data:Ad7dc9f5-a5cf-406f-9d41-9b5f7d92f714 | Open Energy Information  

Open Energy Info (EERE)

f5-a5cf-406f-9d41-9b5f7d92f714 f5-a5cf-406f-9d41-9b5f7d92f714 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Lakewood Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

338

Data:0b0a2c10-a56d-4b2a-a7f7-cbe57981f0b1 | Open Energy Information  

Open Energy Info (EERE)

c10-a56d-4b2a-a7f7-cbe57981f0b1 c10-a56d-4b2a-a7f7-cbe57981f0b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Rate Code 420, Pre-Paid Residential Service Single-Phase Sector: Residential Description: * Available to those members who complete an agreement pursuant to the cooperative's Pre-paid Meter Program. Subject to taxes and wholesale power cost adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

339

Data:Da9bf5f7-5e2f-4589-82e6-a9ad7d3f57af | Open Energy Information  

Open Energy Info (EERE)

bf5f7-5e2f-4589-82e6-a9ad7d3f57af bf5f7-5e2f-4589-82e6-a9ad7d3f57af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2010/01/01 End date if known: Rate name: Energy Efficiency Rider Sector: Residential Description: The Energy Efficiency Rider is designed to recover all, or a portion thereof, of Cooperative costs for energy efficiency programs, demand side management programs, conservation programs, renewable energy programs offered by the Cooperative to meet any Federal, State or local requirements and to help keep Cooperative rates low and encourage energy efficiency practices by all.

340

Data:E57b1d1e-3c3f-4f7b-8671-9cc58beb2e2e | Open Energy Information  

Open Energy Info (EERE)

e-3c3f-4f7b-8671-9cc58beb2e2e e-3c3f-4f7b-8671-9cc58beb2e2e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2011/01/01 End date if known: Rate name: DGE 18 Sector: Residential Description: Regular residential with ETR24* controlled meter Source or reference: http://www.adamsec.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:E4b361b9-a971-43f7-a627-4c64af07f3e7 | Open Energy Information  

Open Energy Info (EERE)

-a971-43f7-a627-4c64af07f3e7 -a971-43f7-a627-4c64af07f3e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Memphis Light, Gas & Water Effective date: 2011/09/30 End date if known: Rate name: OUTDOOR LIGHTING RATE Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic field lighting installations,and outdoor lighting for individual customers. Source or reference: http://www.mlgw.com/images/content/files/pdf_rates/LSOct11.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

342

Addressing Energy Demand through Demand Response: International...  

NLE Websites -- All DOE Office Websites (Extended Search)

Addressing Energy Demand through Demand Response: International Experiences and Practices Title Addressing Energy Demand through Demand Response: International Experiences and...

343

Addressing Energy Demand through Demand Response: International...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Demand through Demand Response: International Experiences and Practices Title Addressing Energy Demand through Demand Response: International Experiences and Practices...

344

Data:Ef81a0f7-11cc-4755-8e56-7713aaf72a0d | Open Energy Information  

Open Energy Info (EERE)

1a0f7-11cc-4755-8e56-7713aaf72a0d 1a0f7-11cc-4755-8e56-7713aaf72a0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Austin, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Bulk Power > 10,000 kW Sector: Description: AVAILABLE: .Within established City Limits. APPLICABLE: Existing Customers, or to new Customers with demands of 10,000 kW or more for two (2) months in a 12-month period whose entire requirements are taken through one meter, under a contract of standard form. (Not applicable to resale, standby or auxiliary service.) CHARACTER OF SERVICE: AC, 60 cycles, 120 Volts or 120/240 Volts, single-phase: 240 Volts, three-phase, three wire; 120/240, 120/208 Volts, or 277/480 Volts, three-phase, four wire; or at any of Austin Utilities' standard Voltages where the service may be supplied by a single power transformer. POWER FACTOR ADJUSTMENT: The rates set forth in this schedule are based on the maintenance by the Customer of a power factor of not less than 95% at all times; if the power factor, as measured by the electric department, is lower than 95%, the monthly demand charge will be multiplied by the ratio 95% bears to the measured power factor, or at Austin Utilities' option, the power factor may be corrected at the Customer's expense.

345

Data:Ca91d2a6-c389-4166-9aec-870440a8f7c0 | Open Energy Information  

Open Energy Info (EERE)

1d2a6-c389-4166-9aec-870440a8f7c0 1d2a6-c389-4166-9aec-870440a8f7c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: LIMITED OFF PEAK SERVICE Secondary Three Phase (Commercial & Industrial) Sector: Commercial Description: Available to any customers for controlled loads that will be energized only for the time period between 10:00 p.m. to 6:30 a.m. daily. DETERMINATION OF CUSTOMER BILLS Customer bills shall reflect energy charges (if applicable) based on customer's kWh usage, plus a customer charge (if applicable), plus demand charges (if applicable) based on customer's kW billing demand as defined. INTERIM RATE ADJUSTMENT A 4.49% Interim Rate Surcharge will be applied to rate components specified in the "Interim Rate Surcharge Rider." In addition, customer bills under this rate are subject to the following adjustments and/or charges. FUEL CLAUSE Bills are subject to the adjustments provided for in the Fuel Clause Rider. RESOURCE ADJUSTMENT Bills are subject to the adjustments provided for in the Conservation Improvement Program Adjustment Rider, the State Energy Policy Rate Rider, the Renewable Development Fund Rider, the Transmission Cost Recovery Rider, the Renewable Energy Standard Rider and the Mercury Cost Recovery Rider.

346

Data:7c1af265-7ea3-48f7-b808-e02673a0abb1 | Open Energy Information  

Open Energy Info (EERE)

af265-7ea3-48f7-b808-e02673a0abb1 af265-7ea3-48f7-b808-e02673a0abb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2011/10/01 End date if known: Rate name: CS Curtailable Service Rider Option A Primary Service Discount Sector: Description: For service taken at 4160 - 69000 volts, when the customer provides all the equipment required to take service at JEA's existing primary lines. To customers eligible for Rate Schedules SS or GSLD who have executed a Curtailable Service Agreement with JEA. The customer agrees during a period of requested curtailment to curtail a minimum load of 200 kW. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rider is not permitted. JEA reserves the right to limit the total load served under this rider. Curtailable service under this rate schedule is subject to curtailment during any time period that electric power and energy delivered hereunder from JEA's available generating resources is required to a) maintain service to JEA's firm power customers and firm power sales commitments, or b) supply emergency interchange service to another utility for its firm load obligations only, and c) when the price of power available to JEA from other sources exceeds 30 cents per kWh. The following charges are applicable to the curtailable portion of the customer's load only. The kW demand and kWh consumption not exceeding the Contracted Non-Curtailable demand shall be billed according to the terms and conditions of the JEA's standard GSLD Rate Schedule.

347

Data:Be551472-497f-4f7b-9df4-5f111fd60483 | Open Energy Information  

Open Energy Info (EERE)

51472-497f-4f7b-9df4-5f111fd60483 51472-497f-4f7b-9df4-5f111fd60483 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2011/10/01 End date if known: Rate name: CS Curtailable Service Rider Option B Transmission Service 69000-230000 volts Sector: Description: Transmission Service Discount for service taken at 69000-230000 volts when the customer provides all the equipment required to take service at JEA's existing transmission lines. To customers eligible for Rate Schedules SS or GSLD who have executed a Curtailable Service Agreement with JEA. The customer agrees during a period of requested curtailment to curtail a minimum load of 200 kW. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rider is not permitted. JEA reserves the right to limit the total load served under this rider. Curtailable service under this rate schedule is subject to curtailment during any time period that electric power and energy delivered hereunder from JEA's available generating resources is required to a) maintain service to JEA's firm power customers and firm power sales commitments, or b) supply emergency interchange service to another utility for its firm load obligations only, and c) when the price of power available to JEA from other sources exceeds 30 cents per kWh. The following charges are applicable to the curtailable portion of the customer's load only. The kW demand and kWh consumption not exceeding the Contracted Non-Curtailable demand shall be billed according to the terms and conditions of the JEA's standard GSLD Rate Schedule.

348

Data:9679354d-3d18-4986-a58c-70f7ff1d085d | Open Energy Information  

Open Energy Info (EERE)

54d-3d18-4986-a58c-70f7ff1d085d 54d-3d18-4986-a58c-70f7ff1d085d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Government and Municipal Service PWWL-18 (6000 Lumens (Nominal)) Sector: Lighting Description: Applicable to parishes and municipalities for lighting of public streets, alleys, thoroughfares, and parks where the Parish owns and maintains the white way fixtures, controls, and the overhead and/or underground system serving same. Where Company maintains and replaces the outer globe on fixtures approved by the Company, there shall be an additional charge of $0.21 per month per fixture.

349

Data:026252f1-6b41-4fee-9f3f-7cce15266aee | Open Energy Information  

Open Energy Info (EERE)

2f1-6b41-4fee-9f3f-7cce15266aee 2f1-6b41-4fee-9f3f-7cce15266aee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

350

Data:Ca94fb47-d744-4b08-b999-6d27c8a05f7e | Open Energy Information  

Open Energy Info (EERE)

fb47-d744-4b08-b999-6d27c8a05f7e fb47-d744-4b08-b999-6d27c8a05f7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGUS Cobrahead HPS 150 W Sector: Lighting Description: If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

351

Data:Cf97ad21-d426-47d2-b6f7-722cebf5eb74 | Open Energy Information  

Open Energy Info (EERE)

ad21-d426-47d2-b6f7-722cebf5eb74 ad21-d426-47d2-b6f7-722cebf5eb74 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Dusk to Dawn Light - 400 watt HPS Sector: Lighting Description: TO WHOM AVAILABLE Available for dusk to dawn area lighting service to Customers for Company-owned lighting systems located on electric supply lines of the Company which are suitable and adequate for supplying the service requested, subject to the conditions set forth in this Rate Schedule and the Company Rules. MAINTENANCE Company will repair and/or replace and maintain all equipment owned by Company which may be necessary to provide a continuous supply of electrical Energy to the point of connection of Company's property

352

Data:E2f31404-d5db-4f7f-8535-b2400dbb2f2e | Open Energy Information  

Open Energy Info (EERE)

-d5db-4f7f-8535-b2400dbb2f2e -d5db-4f7f-8535-b2400dbb2f2e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Private Area Lighting HPS 100 Watt - Granville (Decorative) - Service Option D Sector: Lighting Description: Service Options A. Fixture and Installation Only; B. Maintenance of Fixture Only; C. Energy, Excluding Fuel Charge, for Fixture Only; and D. Full Service: The sum of each of the above Discrete Private Area Lighting Charges (A+B+C), plus the monthly service charge Source or reference: http://www.lakelandelectric.com/Portals/0/docs/pdf/Rates%20&%20Pricing/Electric%20Rates%20Tariffs/html/files/assets/common/downloads/publication.pdf

353

Data:E0a453f7-90e1-4dca-9437-f568ce2484ab | Open Energy Information  

Open Energy Info (EERE)

3f7-90e1-4dca-9437-f568ce2484ab 3f7-90e1-4dca-9437-f568ce2484ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2009/01/01 End date if known: Rate name: RATE OL-1 OUTDOOR LIGHTING SERVICE 400-watt Mercury Vapor Sector: Lighting Description: Available to all member/owners for dusk-to-dawn outdoor lighting in close proximity to existing overhead secondary circuits. Should the member/owner request a light at a location where a transformer must be provided for just the light, i.e. where there is not a metered service off of the transformer serving the light, there will be an additional charge of $6.00 per month for this transformer. This charge will be dropped if a metered service is added to the transformer or this charge will be added if a metered service is disconnected and the security light is left in service.

354

Data:61e7aecf-cba9-44f0-93f7-99b6ced03a0d | Open Energy Information  

Open Energy Info (EERE)

aecf-cba9-44f0-93f7-99b6ced03a0d aecf-cba9-44f0-93f7-99b6ced03a0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

355

Data:6bf97a4f-74e1-40f7-9c67-e5909ec35995 | Open Energy Information  

Open Energy Info (EERE)

a4f-74e1-40f7-9c67-e5909ec35995 a4f-74e1-40f7-9c67-e5909ec35995 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cobb Electric Membership Corp Effective date: 2006/01/01 End date if known: Rate name: Outdoor Lighting Traditional MH 175 W Pole Contribution Paid Concrete Sector: Lighting Description: Pole Contribution Wood 30' $246.00 Wood 35' $297.00 Wood 40' $382.00 Wood 45' $424.00 Fiberglass with Traditional 20' $490.00 Fiberglass with Acorn 20' $490.00 Fiberglass with Roadway 30' $532.00 Fiberglass with Roadway 35' $569.00 Fiberglass with Roadway 39' $772.00 Fiberglass with Decorative 30' $562.00

356

Data:62410f7c-399b-4e06-8519-d3d2392cbc44 | Open Energy Information  

Open Energy Info (EERE)

0f7c-399b-4e06-8519-d3d2392cbc44 0f7c-399b-4e06-8519-d3d2392cbc44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: General Service D3 (Retail Service) Sector: Description: Available to customers desiring service for any purpose, except that this rate is not available for service in conjunction with the Large General Service Rate. At the Company's option, service may be available to loads in excess of 1000 kW for situations where significant modifications to service facilities are not required to serve the excess load. Effective May 27, 1981, this rate is not available to customers desiring service through one meter for residential purposes to a single or double occupancy dwelling unit.

357

Data:1a4d8382-4c85-4ead-99f6-924c97e42f7e | Open Energy Information  

Open Energy Info (EERE)

382-4c85-4ead-99f6-924c97e42f7e 382-4c85-4ead-99f6-924c97e42f7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Residential- Single- Phase- Time-of-Day- Peak: 9am-9pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

358

Data:0f5dac8f-61a2-4f7c-83a9-ce2d45614c35 | Open Energy Information  

Open Energy Info (EERE)

f5dac8f-61a2-4f7c-83a9-ce2d45614c35 f5dac8f-61a2-4f7c-83a9-ce2d45614c35 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 7000 Lumen 175 Watt Mercury Vapor Post Top and Streetlight Company Owned Overhead Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

359

Data:12396180-bb02-4195-9fa5-51fe1d7f7fd5 | Open Energy Information  

Open Energy Info (EERE)

80-bb02-4195-9fa5-51fe1d7f7fd5 80-bb02-4195-9fa5-51fe1d7f7fd5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

360

Data:9eec1762-5015-4f7d-a2ae-61001ae3e20b | Open Energy Information  

Open Energy Info (EERE)

eec1762-5015-4f7d-a2ae-61001ae3e20b eec1762-5015-4f7d-a2ae-61001ae3e20b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Interrupible Irrigation Service 5 Day Control Sector: Industrial Description: To year-round irrigation service customers who will contract for five (5 HP) horsepower or more, and agree to participate in Loup's peak reduction irrigation plan. This rate is not available for center pivot drive motors only. payable in three (3) equal installments; billing in the months of May, June and July Source or reference: http://www.loup.com/customersvc/rates.asp

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:F42aaf65-83e1-48fb-8d0c-7968401337f7 | Open Energy Information  

Open Energy Info (EERE)

aaf65-83e1-48fb-8d0c-7968401337f7 aaf65-83e1-48fb-8d0c-7968401337f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: A23EE - SINGLE-PHASE ENERGY EFFICIENT HOME SERVICE Sector: Residential Description: * AVAILABILITY This schedule is available to all single-phase non-commercial consumers and whose all-electric homes meet the current standards as set forth by Randolph EMC as to energy efficiency. Energy efficient standards include but shall not be limited to: insulation R factors; attic ventilation; basement and crawl space ventilation; the use of storm windows and doors or windows and doors using thermal glass; proper caulking and sealing of windows and doors; load management switches on water heaters and air conditioners; and other energy efficient methods and equipment as deemed suitable by Randolph EMC. Individual motors served under this schedule shall not exceed ten horsepower. (Commercial consumers receiving service prior to May 10, 1993 may continue to receive service under this schedule. Commercial consumers connected on or after May 10, 1993 will receive under Schedule GS23.)

362

Data:7fae8f7b-e984-49e7-b9ef-85782ac24893 | Open Energy Information  

Open Energy Info (EERE)

f7b-e984-49e7-b9ef-85782ac24893 f7b-e984-49e7-b9ef-85782ac24893 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shawano Municipal Utilities Effective date: 2007/08/20 End date if known: Rate name: Street Lighting 100w HPS Acorn Utility owned Sector: Lighting Description: Fixture Only $5.00/mo 15 to 16 ft. cast iron, wood or steel... $3.40/month/pole 16ft. aluminum pole ......... $4.50/ month/pole 30ft. fiberglass w/ (1)6` arm ......... $10.50/month/pole 30ft. fiberglass w/ (1) 12` arm ......... $11/month/pole 30ft. fiberglass w/ (2) 12` arm ............ $13/month/pole 30f .steel w/ (1) arm ............ $10/month/pole

363

Data:170d0e02-ff29-432f-a16a-429a0f7f622a | Open Energy Information  

Open Energy Info (EERE)

e02-ff29-432f-a16a-429a0f7f622a e02-ff29-432f-a16a-429a0f7f622a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: GP-Educational Institution Service Provision (GEI)-Full Service-Educational Institution Credit for Customer Voltage Level 2 (CVL 2) Sector: Commercial Description: When service is supplied to a school, college or university, a credit shall be applied during all billing months. As used in this provision, "school" shall mean buildings, facilities, playing fields, or property directly or indirectly used for school purposes for children in grades kindergarten through twelve, when provided by a public or nonpublic school. School does not include instruction provided in a private residence or proprietary trade, vocational, training, or occupational school. "College" or "University" shall mean buildings located on the same campus and used to impart instruction, including all adjacent and appurtenant buildings owned by the same customer which are located on the same campus and which constitute an integral part of such college or university facilities.

364

Data:A3139a10-5a5d-4e43-b18f-44647826a5f7 | Open Energy Information  

Open Energy Info (EERE)

a10-5a5d-4e43-b18f-44647826a5f7 a10-5a5d-4e43-b18f-44647826a5f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate OL - Outdoor Lighting Service - SV 150 Watts Sector: Lighting Description: Applicable for outdoor lighting services on private property with Company owned fixtures in the Company's entire service area where secondary distribution lines are adjacent to the premises to be served. Not applicable for lighting public roadways which are dedicated, or anticipated to be dedicated, except to meet the occasional singular need of a customer who has obtained written approval from the proper governmental authority.

365

Data:F18470dd-5838-40ef-af68-8513b32b31f7 | Open Energy Information  

Open Energy Info (EERE)

8470dd-5838-40ef-af68-8513b32b31f7 8470dd-5838-40ef-af68-8513b32b31f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Double Mastarm Lamp Fixtures -Breakaway Contemporary aluminum pole Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

366

Data:Fa2d1db9-c278-4377-8cfe-f7ac2952675d | Open Energy Information  

Open Energy Info (EERE)

db9-c278-4377-8cfe-f7ac2952675d db9-c278-4377-8cfe-f7ac2952675d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

367

Data:7fae4d25-987d-4923-886f-7dad77165bb1 | Open Energy Information  

Open Energy Info (EERE)

fae4d25-987d-4923-886f-7dad77165bb1 fae4d25-987d-4923-886f-7dad77165bb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Maine Power Co Effective date: 2012/07/01 End date if known: Rate name: AL Discontinued Lighting-Prismasphere Simple Metal Halide 175 watts Sector: Lighting Description: This rate is available for area lighting service furnished on a dusk-to-dawn basis. The Company will furnish, install and maintain area lights in new locations as may be requested in writing for area lighting service, subject to the TERM OF SERVICE specified below. TERM OF SERVICE The term of service under this schedule shall be by service agreement for a period of fifteen (15) years and on a continuing basis thereafter. Requests for additions, changes or removals for area lighting service may require 90 days' advance written notice.

368

Data:Daf332f7-dc54-464b-b7b0-6b6973ed78e2 | Open Energy Information  

Open Energy Info (EERE)

Daf332f7-dc54-464b-b7b0-6b6973ed78e2 Daf332f7-dc54-464b-b7b0-6b6973ed78e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Slinger Utilities Effective date: 2007/01/05 End date if known: Rate name: Overhead Street Lighting- 250W HPS with Fiberglass Pole Sector: Lighting Description: This schedule will be applied to municipal street lighting and private yard lighting. The utility will furnish, install, and maintain street lighting units. This rate is subject to a Power Cost Adjustment charge per all kWh, that varies on a monthly basis. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=5510

369

Data:94bb266a-77b0-462b-be1e-9896c2a9a0f7 | Open Energy Information  

Open Energy Info (EERE)

66a-77b0-462b-be1e-9896c2a9a0f7 66a-77b0-462b-be1e-9896c2a9a0f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 2003/09/19 End date if known: Rate name: Commercial Surge Protection Service Sector: Commercial Description: This rate is available for commercial surge protection to any Coldwater Board of Public Utilities customer with 120/240VAC, 100A - 200A, single-phase service or 208/220/240/277 VAC three-phase service. Subject to approval by the Utility and proper execution of contract. Source or reference: http://www.coldwater.org/Content/Utility_General_Info.html

370

Data:22b23274-cc4f-4100-b5f7-5fa49fa30781 | Open Energy Information  

Open Energy Info (EERE)

-cc4f-4100-b5f7-5fa49fa30781 -cc4f-4100-b5f7-5fa49fa30781 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

371

Data:71e329f7-965e-42d2-b1ae-faf51260d7a6 | Open Energy Information  

Open Energy Info (EERE)

29f7-965e-42d2-b1ae-faf51260d7a6 29f7-965e-42d2-b1ae-faf51260d7a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wilton, Iowa (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Small General Service Single Phase Sector: Commercial Description: The commercial rate for electric energy sold by the system on 120/240 volt service and 480 volt service. The foregoing rates for each KWH shall be increased by $.011 for each $.010 that the combined cost of fuel and energy purchased per KWH exceeds $.045 per KWH. Adjustments for the cost of fuel and energy purchased shall be made monthly and shall be based upon the average cost of fuel and energy purchased during the preceding month. The fuel and energy cost adjustment base will be $.0415 per KWH.

372

Data:38e2b8e2-dd0f-478a-86f7-6342c3c56001 | Open Energy Information  

Open Energy Info (EERE)

-dd0f-478a-86f7-6342c3c56001 -dd0f-478a-86f7-6342c3c56001 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

373

Data:24f48897-8a68-4ae0-99d9-ecc0281f7ece | Open Energy Information  

Open Energy Info (EERE)

f48897-8a68-4ae0-99d9-ecc0281f7ece f48897-8a68-4ae0-99d9-ecc0281f7ece No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACTON General Service G-3 (B3/B4),(G6/G7) Sector: Industrial Description: Service under this rate is available for all use at a single location on contiguous private property if service is supplied to the Customer and metered at 14,000 volts nominal or greater and if the Customer furnishes, installs, owns and maintains at his expense all protective devices, transformers and other equipment required by the Company. Service under this rate is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

374

Data:98b4efc0-a9f7-4097-8efc-3b4588b4f107 | Open Energy Information  

Open Energy Info (EERE)

efc0-a9f7-4097-8efc-3b4588b4f107 efc0-a9f7-4097-8efc-3b4588b4f107 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 400 W MH(Double Fixture Facilities-No Outside Cost Contribution) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

375

Data:Bbc365ed-c468-42f7-a7e2-964d639e47a2 | Open Energy Information  

Open Energy Info (EERE)

Bbc365ed-c468-42f7-a7e2-964d639e47a2 Bbc365ed-c468-42f7-a7e2-964d639e47a2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Residential- Single-Phase- Time-of-Day- Peak: 8am-8pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

376

Data:48b6172f-7c7c-4ea4-8d54-a51f73c43fdf | Open Energy Information  

Open Energy Info (EERE)

72f-7c7c-4ea4-8d54-a51f73c43fdf 72f-7c7c-4ea4-8d54-a51f73c43fdf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Rg-1 Residential Service Three Phase Sector: Residential Description: Application: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Fixed Monthly Charge includes Commitment to Community Rider: $1.10 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=350

377

Data:5f97368e-9814-4f0c-9bcb-c9f7fb6e0b23 | Open Energy Information  

Open Energy Info (EERE)

368e-9814-4f0c-9bcb-c9f7fb6e0b23 368e-9814-4f0c-9bcb-c9f7fb6e0b23 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2001/07/01 End date if known: Rate name: 20 LP-6 Large Power Sector: Description: Available to non-residential Consumers requiring a transformer capacity of 75 kVA or more, but less than 1,000 kVA, subject to Association's established rules and regulations. This rate applies to electrci service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others. Single phase and or three phase, 60 cycles, at available secondary voltages. Motors having a rated capacity of 10 HP or above must be three phase.

378

Data:1dfd416f-7afa-4cce-b909-a6c69022e339 | Open Energy Information  

Open Energy Info (EERE)

dfd416f-7afa-4cce-b909-a6c69022e339 dfd416f-7afa-4cce-b909-a6c69022e339 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Ms-1 Street Lighting Service 50 W LED Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

379

Data:A175b483-b9a8-4660-a56c-bf7119f7a273 | Open Energy Information  

Open Energy Info (EERE)

b483-b9a8-4660-a56c-bf7119f7a273 b483-b9a8-4660-a56c-bf7119f7a273 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/06/23 End date if known: Rate name: Fg-1 Rural Residential Service Single Phase Seasonal (June through November) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

380

Data:7cf58335-e48b-48f5-8f7d-8c7064c518ba | Open Energy Information  

Open Energy Info (EERE)

8335-e48b-48f5-8f7d-8c7064c518ba 8335-e48b-48f5-8f7d-8c7064c518ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Residential- Three-Phase- Time-of-Day- Peak: 7am-7pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:1fa1bb9d-9b66-4f7e-8127-1375f38de27d | Open Energy Information  

Open Energy Info (EERE)

d-9b66-4f7e-8127-1375f38de27d d-9b66-4f7e-8127-1375f38de27d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: City Commercial Energy Rate Three Phase Sector: Commercial Description: To commercial customers for all purposes except those otherwise specially rated. For as long as the City has costs associated with the ownership of the power plant, these costs shall be recovered through the following power plant cost adjustment factor:$0.01000 for all kWh, all service classes. State of Michigan P.A. 295, of Public Acts 2008, commonly referred to as the Clean, Renewable and Efficient Energy Act mandates the electric utility collect the following charges from each electric utility customer: Commercial $0.00200/kWh. The sum of these charges is reflected in adjustments to the energy charge.

382

Data:E49c7985-e41b-44f7-98a8-b8cee9e9a090 | Open Energy Information  

Open Energy Info (EERE)

85-e41b-44f7-98a8-b8cee9e9a090 85-e41b-44f7-98a8-b8cee9e9a090 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Government and Municipal Service PWWL-18 (5000 Lumens (Nominal)) Sector: Lighting Description: Applicable to parishes and municipalities for lighting of public streets, alleys, thoroughfares, and parks where the Parish owns and maintains the white way fixtures, controls, and the overhead and/or underground system serving same. Where Company maintains and replaces the outer globe on fixtures approved by the Company, there shall be an additional charge of $0.21 per month per fixture.

383

Data:474fa27a-5e5e-44c4-bdc7-f7b5c4697690 | Open Energy Information  

Open Energy Info (EERE)

fa27a-5e5e-44c4-bdc7-f7b5c4697690 fa27a-5e5e-44c4-bdc7-f7b5c4697690 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 23 Special Contract for Large Customers (4B PNM Transformer) Sector: Description: Public Service Company of NM will make this Special Contract Service Rate available to qualifying customers who have a minimum 1 MW load at a single service location, in at least six months of the previous consecutive 12 months. Under SCS, PNM will seek to acquire electric energy from a supplier that best meets the customer's needs and meets PNM's eligibility and contract requirements set forth herein. On that basis, PNM will provide fully bundled electric service to the customer at a price that covers PNM's energy acquisition cost, PNM's delivery charges, and a service fee. SCS customers remain retail customers of the Company.

384

Data:A69f8d52-eadb-49f7-bc82-2ad9ae5b2f3a | Open Energy Information  

Open Energy Info (EERE)

d52-eadb-49f7-bc82-2ad9ae5b2f3a d52-eadb-49f7-bc82-2ad9ae5b2f3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2012/04/01 End date if known: Rate name: RESIDENTIAL SERVICE SCHEDULE SDR-3 Three Phase Sector: Residential Description: APPLICABILITY Applicable to all domestic uses in single-family residences, individual apartments or small farms, supplied through a single meter and one Point of Delivery; provided that equipment and installations for space and water heating shall be subject to approval of the District. BASIC REQUIREMENTS 1. The Customer must occupy the subject premises, must be age sixty-five (65) or older and have been signed for service as a Cowlitz PUD residential electric customer for not less than the past 12 consecutive months.

385

Data:9629a733-f052-4ee0-92f7-1d476d64bbaa | Open Energy Information  

Open Energy Info (EERE)

3-f052-4ee0-92f7-1d476d64bbaa 3-f052-4ee0-92f7-1d476d64bbaa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2012/04/01 End date if known: Rate name: GENERAL SERVICE Over 50 kW Poly Phase Service Sector: Commercial Description: APPLICABLE: To nonresidential customers whose entire electric service requirements are supplied and whose loads have never registered 1,000 kW or more, more than once in any consecutive 36-month period. Deliveries at more than one point, or more than one voltage and phase classification, will be separately metered and billed. Service for intermittent, partial requirements, or highly fluctuating loads, or where service is seasonally disconnected during any one-year period, will be provided only by special contract for such service.

386

Data:Ab748020-d838-4a5c-a5cf-1f5e55b859f7 | Open Energy Information  

Open Energy Info (EERE)

20-d838-4a5c-a5cf-1f5e55b859f7 20-d838-4a5c-a5cf-1f5e55b859f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

387

Data:4b09a129-5371-4f7c-9fee-f53c3d9e67b4 | Open Energy Information  

Open Energy Info (EERE)

5371-4f7c-9fee-f53c3d9e67b4 5371-4f7c-9fee-f53c3d9e67b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

388

Data:043515fc-be6f-4bca-bc01-2f7db75e2cdb | Open Energy Information  

Open Energy Info (EERE)

fc-be6f-4bca-bc01-2f7db75e2cdb fc-be6f-4bca-bc01-2f7db75e2cdb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: UNS Electric, Inc Effective date: 2011/07/01 End date if known: Rate name: C.A.R.E.S 300kWh-600kWh Sector: Residential Description: This C.A.R.E.S. pricing plan is available to those residential customers presently taking service under the Company's residential service pricing plan whose gross annual income is not more than one hundred fifty percent (150%) of the federal poverty level guideline effective at the time qualification and annual certification is sought. Customer Charge = Meter Services + Meter Reading + Billing & Collection + Customer Delivery

389

Data:Ab63c2ba-f055-4983-90f7-7fa4bc8cadd9 | Open Energy Information  

Open Energy Info (EERE)

c2ba-f055-4983-90f7-7fa4bc8cadd9 c2ba-f055-4983-90f7-7fa4bc8cadd9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mazomanie, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Rg-1 Residential Service Single Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0574 per kilowatt-hour.

390

Data:9b9629a5-3342-48b9-ad68-1388174a03f7 | Open Energy Information  

Open Energy Info (EERE)

a5-3342-48b9-ad68-1388174a03f7 a5-3342-48b9-ad68-1388174a03f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 250 watt MH - Post Top - Classic Sector: Lighting Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

391

Data:11d48e1b-18f7-4012-a944-a8e5b7a11d0c | Open Energy Information  

Open Energy Info (EERE)

e1b-18f7-4012-a944-a8e5b7a11d0c e1b-18f7-4012-a944-a8e5b7a11d0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: STREET LIGHTING SYSTEM SERVICE 100W High Pressure Sodium Decorative Sector: Lighting Description: Available for year-round illumination of public streets, parkways, and highways by High Pressure Sodium (HPS) or Metal Halide electric lamps in luminaires supported on poles, where the facilities for this service are furnished by Company. Underground Service under this schedule is limited to areas having a Company owned underground electric distribution system. Standard Service includes a monthly payment for the lighting system cost. Pre-Pay Option requires customer payment for the lighting system cost before establishing service.

392

Data:0318c2f2-e1f7-453c-b78d-7be37aca21e1 | Open Energy Information  

Open Energy Info (EERE)

c2f2-e1f7-453c-b78d-7be37aca21e1 c2f2-e1f7-453c-b78d-7be37aca21e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 1 - Residential Sector: Residential Description: Available to members of the Cooperative for requiring a single-phase service, subject to the Cooperative's established rules and regulations. Service under this Schedule #0001 is limited to installations requiring 50 KVA or less of transformer capacity and the starting current of the largest motor does not exceed 260 amperes. Source or reference: www.cceci.com

393

Data:7306780c-3f7f-484c-ab99-7a35e5422166 | Open Energy Information  

Open Energy Info (EERE)

780c-3f7f-484c-ab99-7a35e5422166 780c-3f7f-484c-ab99-7a35e5422166 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: RushShelby Energy Effective date: 2010/04/01 End date if known: Rate name: Schedule SL: Security Lighting Service 175 watt or lower Sector: Lighting Description: AVAILABILITY Available to any member of the Cooperative where 120 volt service exists ahead of the meter loop for the use of Security Lighting. CHARACTER OF SERVICE Dusk-to-dawn lighting service, using photo-electrically controlled equipment, mast arm, street light type luminaire with lamp. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required by the extension of secondary lines or hanging of a transformer or installation of poles, for the sole purpose of this service will require a contribution by the member.

394

Data:02987a2b-86f7-45ae-89cd-4533e120be0f | Open Energy Information  

Open Energy Info (EERE)

a2b-86f7-45ae-89cd-4533e120be0f a2b-86f7-45ae-89cd-4533e120be0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 1B Residential TOU within Grant, Lincoln, Hidalgo and Otero counties Sector: Residential Description: The rates on this Schedule are available for single-family houses, individual farm units, indEvidual apartments, or separate living quarters ordinarily designated and recognized as single-family living quarters for primarily domestic or home use. Service under this Schedule is not available for commercial rooming houses, multiple trailer parks, commercial, professional, or business establishments and the like, which shall be served under another applicable commercial Rate Schedule. All service shall be delivered at a single service location to be designated by the Company.

395

Data:F7681ee7-19c7-4763-870e-2c79c9c552f7 | Open Energy Information  

Open Energy Info (EERE)

ee7-19c7-4763-870e-2c79c9c552f7 ee7-19c7-4763-870e-2c79c9c552f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: El Paso Electric Co (New Mexico) Effective date: 2010/01/01 End date if known: Rate name: MGS (Medium General Service Secondary) Sector: Commercial Description: This rate is available to all Customers for lighting, power, and heating service. All service will be taken at tone point of delivery designated by the Company and at one of the Company's standard types of service./ Service under this rate shall be limited to customers whose highest 30 minute average kilowatt (KW) load is not less than 0 kW and does not exceed 799 kW.

396

Data:B28397f6-8af5-4740-b88e-9f7c71fd8aa0 | Open Energy Information  

Open Energy Info (EERE)

f6-8af5-4740-b88e-9f7c71fd8aa0 f6-8af5-4740-b88e-9f7c71fd8aa0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Roadway Lighting-High Pressure Sodium-400 watts-Outside Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

397

Data:6707d31f-50d3-45f7-8b5c-924924d85cb0 | Open Energy Information  

Open Energy Info (EERE)

07d31f-50d3-45f7-8b5c-924924d85cb0 07d31f-50d3-45f7-8b5c-924924d85cb0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule SL-MF(Street lighting-Municipal Franchise Area)Rate Schedule SL-MF(Street lighting-Municipal Franchise Area)(Street lights coop-owned 250 Watt) Sector: Lighting Description: Available to Municipalities that have granted the cooperative a current utility franchise and contract for lighting service for illuminating of public streets or other public areas by means of cooperative owned, and/or municipal owned, and maintained street light facilities.

398

Data:C318d38c-3d94-42bd-99f7-0311cb34d5c8 | Open Energy Information  

Open Energy Info (EERE)

8d38c-3d94-42bd-99f7-0311cb34d5c8 8d38c-3d94-42bd-99f7-0311cb34d5c8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

399

Data:111f08f4-f631-4f7a-8b5f-464715fd5c33 | Open Energy Information  

Open Energy Info (EERE)

-f631-4f7a-8b5f-464715fd5c33 -f631-4f7a-8b5f-464715fd5c33 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mississippi Power Co Effective date: 2007/12/04 End date if known: Rate name: RATE SCHEDULE "CSPP-3" (TP) Sector: Commercial Description: Applicable for any customer who has installed an electric generating facility of 100 kW capacity or less solely for his own use and desires a permanent electrical connection with the Company's system in order to sell electrical energy to the Company and to secure supplementary service from the Company. The electric generating facility must be a qualified facility (QF) under provisions of Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978, or as amended.

400

Data:5271a4b5-7b9f-4c91-815c-9df7931dd7f7 | Open Energy Information  

Open Energy Info (EERE)

a4b5-7b9f-4c91-815c-9df7931dd7f7 a4b5-7b9f-4c91-815c-9df7931dd7f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Virginia Elec Coop Effective date: 2012/10/01 End date if known: Rate name: Schedule SC-1 RA, Small Commercial, Three Phase Sector: Commercial Description: Applicable to commercial and small power consumers located on or near the Cooperatives distribution for all uses unless another rate Schedule is speciñcally applicable. Single-phase consumers having their residences on the same premises may include residential service on the same meter with the commercial service. Three-phase consumers may connect incidental lighting to the power circuit for the power meter.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:4ff9aa4d-7e5c-4bee-8716-9cbfef8f7b7d | Open Energy Information  

Open Energy Info (EERE)

aa4d-7e5c-4bee-8716-9cbfef8f7b7d aa4d-7e5c-4bee-8716-9cbfef8f7b7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Indiana (Utility Company) Effective date: 1997/10/27 End date if known: Rate name: SL Public Street Lighting Overhead 250 watt Sodium Vapor metal pole Sector: Lighting Description: Availability. Available for street lighting within the corporate limits of the city and highway lighting within the area served by the utility's distribution system. Character of service. Standard street lighting service using lamps available under this schedule. Source or reference: http://www.amlegal.com/nxt/gateway.dll/Indiana/frankfort_in/cityoffrankfortindianacodeofordinances?f=templates$fn=default.htm$3.0$vid=amlegal:frankfort_in

402

Data:1f1341f7-d9b4-4ebe-a5e1-54adcd3309c0 | Open Energy Information  

Open Energy Info (EERE)

341f7-d9b4-4ebe-a5e1-54adcd3309c0 341f7-d9b4-4ebe-a5e1-54adcd3309c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Rg-1 Residential Service Single Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

403

Data:41383738-f7ef-4bdb-bc45-c5a5c02e6c3a | Open Energy Information  

Open Energy Info (EERE)

38-f7ef-4bdb-bc45-c5a5c02e6c3a 38-f7ef-4bdb-bc45-c5a5c02e6c3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2011/01/15 End date if known: Rate name: Experimental Advanced Renewable Energy Purchase Service Biomass/Biogas (Tier 1: 800 kW more than 100 kW) Sector: Description: Effective In All territories served by the Company. Definition: Distributed generation facilities are electricity generators owned by the customer, located close to the point of energy consumption, and small in scale, usually no more than the existing load of the customer. Availability The advanced renewable energy tariff is available to retail customers who own small distributed generation facilities that are powered by a renewable resource and placed in initial service after January 1, 2012, or who executed an advanced renewable energy contract prior to January 1, 2012. maximum size project per customer is: * Biomass/Biogas: * Tier 1: 800 kW * Tier 2: 2 MW * Tier 3 5 MW (Community-based Projects Only) Generators rated at more than 100 kW: $13.80/mo.

404

Data:8224e1ec-59f7-4b3e-a948-b7c1e69d7992 | Open Energy Information  

Open Energy Info (EERE)

e1ec-59f7-4b3e-a948-b7c1e69d7992 e1ec-59f7-4b3e-a948-b7c1e69d7992 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Double Mastarm Lamp Fixtures - Contemporary Aluminum Pole - Company Owned Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

405

Data:25132ac7-c487-49fd-bebb-2f7e82bccf95 | Open Energy Information  

Open Energy Info (EERE)

ac7-c487-49fd-bebb-2f7e82bccf95 ac7-c487-49fd-bebb-2f7e82bccf95 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Lamp Fixtures - Contemporary aluminum pole Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

406

Data:3dc8f7a9-960e-4bbe-b88b-4aad89db3f9f | Open Energy Information  

Open Energy Info (EERE)

f7a9-960e-4bbe-b88b-4aad89db3f9f f7a9-960e-4bbe-b88b-4aad89db3f9f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Roanoke Electric Member Corp Effective date: 2010/07/26 End date if known: Rate name: Security LS-175-Watt Metal Halide - Cobra Sector: Lighting Description: AVAILABILITY This schedule is available in all territory served by the Cooperative, subject to the Cooperative's established Service Rules and Regulations. APPLICABILITY This schedule is applicable to any consumer of the Cooperative for yard, security, or decorative lighting from dusk to dawn. Source or reference: http://www.roanokeelectric.com/documents/RateSchedule20100726_000.pdf

407

Data:Ccdb885d-1e20-4787-938c-2f7e696d485e | Open Energy Information  

Open Energy Info (EERE)

Ccdb885d-1e20-4787-938c-2f7e696d485e Ccdb885d-1e20-4787-938c-2f7e696d485e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2011/10/28 End date if known: Rate name: Street/Lighting Rate Schedules DSL - (Directional security lighting rate) MH 1000W Sector: Lighting Description: For service to customers contracting for directional security lighting service from flood lighting equipment supplied by Company. The service provided pursuant to this Rate Schedule is not for the benefit of any person, firm, legal entity, or governing body other than Customer. The flood lighting equipment shall be mounted only on Company owned or controlled poles or Customer-owned poles so long as customer agrees to be responsible for any liability related to that installation.

408

Data:6197f7db-c499-4d8c-a7ed-3ec18a179e34 | Open Energy Information  

Open Energy Info (EERE)

f7db-c499-4d8c-a7ed-3ec18a179e34 f7db-c499-4d8c-a7ed-3ec18a179e34 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting Rate 18- Street and Area Light (100 W Sodium Vapor) Sector: Lighting Description: Street, area and flood lighting, traffic signal and specialty lighting equipment, energy and maintenance service is available within Green Mountain Power Corporation's ("GMP") service territory under this rate for GMP-owned or Customer-owned equipment to any city, village, town, fire district, political subdivision, Customer association or individual Customer in accordance with the specifications hereinafter set forth.

409

Data:019c7f29-bb52-47f7-b77a-f2d117f094ff | Open Energy Information  

Open Energy Info (EERE)

f29-bb52-47f7-b77a-f2d117f094ff f29-bb52-47f7-b77a-f2d117f094ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Cogeneration and/or Small Power Production -T.O.D-Single phase Sector: Commercial Description: This schedule is available to customers with cogeneration and/or small power production (COGEN/SPP) facilities which qualify under Section 210 of the Public Utility Regulatory Policies Act of 1978, and which have a total design capacity of 100 KW or less. Such facilities shall be designed to operate properly in parallel with the Company's system without adversely affecting the operation of

410

Data:6313e064-b7a2-4be4-8f7e-8ae9c5771377 | Open Energy Information  

Open Energy Info (EERE)

4-b7a2-4be4-8f7e-8ae9c5771377 4-b7a2-4be4-8f7e-8ae9c5771377 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positiv¬e or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

411

Data:Bb0af090-5f7e-4711-9915-ae74e761a107 | Open Energy Information  

Open Energy Info (EERE)

90-5f7e-4711-9915-ae74e761a107 90-5f7e-4711-9915-ae74e761a107 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: Rental Lighting: RL-12 HPS Cobra 400W Sector: Lighting Description: I. AVAILABILITY This schedule is available to any customer of Northeastern REMC (Northeastern) for continuous year round service for outdoor lighting where 120-volt service exists ahead of the meter loop. II. CHARACTER OF SERVICE Dusk-to-dawn lighting service will be furnished, using photoelectric controlled equipment, mast arm, light luminaire and bulb installed on an existing pole. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Except as provided for herein, any additional investment required for the sole purpose of providing this service shall require a contribution by the customer equal to the actual investment cost.

412

Data:27a7a93b-f7c4-42e0-8829-ff9ffe244222 | Open Energy Information  

Open Energy Info (EERE)

b-f7c4-42e0-8829-ff9ffe244222 b-f7c4-42e0-8829-ff9ffe244222 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange & Rockland Utils Inc Effective date: 2012/04/01 End date if known: Rate name: SC16 Power Bracket Sodium Vapor Overhead and Underground 150w (Customer owned, retail service, multiple bills) Sector: Description: APPLICABLE TO USE OF SERVICE FOR: Sales and delivery of electric power supply provided by the Company or delivery of electric power supply provided by an Energy Service Company under the Company's Retail Access Program for outdoor lighting of areas, beyond the limits of public streets, highways or roadways, for use of individuals and private or public organizations where existing distribution facilities are suitable for the service requested.

413

Data:4d502c4a-7480-45f7-a4bd-3bbc282db6a9 | Open Energy Information  

Open Energy Info (EERE)

c4a-7480-45f7-a4bd-3bbc282db6a9 c4a-7480-45f7-a4bd-3bbc282db6a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

414

Data:0fe694fe-a8c0-4d81-80f7-720c8ec90dba | Open Energy Information  

Open Energy Info (EERE)

fe-a8c0-4d81-80f7-720c8ec90dba fe-a8c0-4d81-80f7-720c8ec90dba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: Street and Highway Lighting 400w Mercury Vapor Sector: Lighting Description: Monthly Charge: Includes energy costs only, with the Customer having paid the installation costs and the periodic maintenance costs. Contract Options: For services beyond energy only, the PUD offers standard contracts for maintenance and contracts to finance Customer's street lighting installations. All applicable BPA Power Cost Adjustment charges per Rate Schedule 94 shall apply to all kWh's billed to Customers under this Rate Schedule.

415

Data:10add6f3-94ef-463e-8151-e36f7f6ee4c0 | Open Energy Information  

Open Energy Info (EERE)

f3-94ef-463e-8151-e36f7f6ee4c0 f3-94ef-463e-8151-e36f7f6ee4c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights 400 watt high pressure sodium Direct/120v(Non-metered) Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

416

Data:934913f7-b14c-4bd8-9fa3-57eaa219b4eb | Open Energy Information  

Open Energy Info (EERE)

f7-b14c-4bd8-9fa3-57eaa219b4eb f7-b14c-4bd8-9fa3-57eaa219b4eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: SCHEDULE 15 - LARGE POWER - BETWEEN 2,500 - 7,500 kW Sector: Industrial Description: Available for commercial and industrial service greater than 2,500 kVA but less than 7,500 kVA required transformer capacity, for all uses including lighting, heating, and power within the District's service area. Source or reference: http://www.norrisppd.com/downloads/Schedule%2015%20-%20Large%20Power%20-%20Between%202,500%20-%207,500%20kW.pdf

417

Data:B79b9df8-dda8-4d89-a756-9f7f43067e86 | Open Energy Information  

Open Energy Info (EERE)

B79b9df8-dda8-4d89-a756-9f7f43067e86 B79b9df8-dda8-4d89-a756-9f7f43067e86 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2010/06/30 End date if known: Rate name: 2 SMALL GENERAL SERVICE Sector: Commercial Description: To electric service for any non-residential customer for whom no specific schedule is provided, supplied at one point of delivery and measured through one kilowatt-hour meter. Service under this schedule is also available to supply power to street lighting systems not owned or maintained by the company in unincorporated communities having a property owner's association duly authorized to contract on behalf of the residents of such community for such service.

418

Data:D7d31f7a-caa3-440e-a989-ec07a39add1f | Open Energy Information  

Open Energy Info (EERE)

d31f7a-caa3-440e-a989-ec07a39add1f d31f7a-caa3-440e-a989-ec07a39add1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Argyle, Wisconsin (Utility Company) Effective date: 2008/05/29 End date if known: Rate name: Ms-1 Overhead 250 W HPS Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Note: MV = Mercury Vapor HPS = High Pressure Sodium Fixed Monthly Charge includes Commitment to Community Rider: $1.34 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=230

419

Data:Db01b1f7-2266-4bdf-ad9f-8aaa83ca3bca | Open Energy Information  

Open Energy Info (EERE)

Db01b1f7-2266-4bdf-ad9f-8aaa83ca3bca Db01b1f7-2266-4bdf-ad9f-8aaa83ca3bca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: General Service Primary(GP)-Charges for Customer Voltage Level 2 (CVL 2) Sector: Commercial Description: Subject to any restrictions, this rate is available to any customer, political subdivision or agency of the State of Michigan, either acting separately or in combinations permitted under the laws of this state, desiring Primary Voltage service for general use or for public potable water pumping and/or waste water system(s). This rate is available to existing Full Service Customers with an electric generating facility interconnected at a primary voltage level utilizing General Service Primary Rate GP for standby service on or before June 7, 2012. The amount of retail usage shall be determined on an hourly basis. Customers with a generating installation are required to have an Interval Data

420

Data:208f7ef3-cfb5-4748-a8d8-d569f0491c16 | Open Energy Information  

Open Energy Info (EERE)

f7ef3-cfb5-4748-a8d8-d569f0491c16 f7ef3-cfb5-4748-a8d8-d569f0491c16 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 1990/01/01 End date if known: Rate name: Unmetered Outdoor Lighting- 400W Mercury Vapor -With Pole Sector: Lighting Description: Dusk to dawn unmetered service is covered by charges set forth below which also cover initial installation of overhead lines, poles (where applicable), fixture assembly including four foot mounting hardware for standard luminaries and two foot mounting hardware for flood lights, and maintenance including lamp replacements due to burn outs. Such charges do not cover replacement of lamps, luminaries, brackets or overhead lines which are damaged or destroyed due to vandalism or any other cause beyond the Utility's control, such facilities damaged or destroyed under such circumstances to be replaced by the Utility at the Consumer's expense. Lamp renewals and required maintenance will be performed only during regular daytime working hours as soon as practical after notification by the Consumer of the necessity.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:Fe2554df-28c5-4f79-91e0-f7ccd73aeddc | Open Energy Information  

Open Energy Info (EERE)

df-28c5-4f79-91e0-f7ccd73aeddc df-28c5-4f79-91e0-f7ccd73aeddc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Large Power Time-of-Day Service(>6000 volts) Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

422

Data:F05a1f7a-6876-4a7d-8e0c-5094b7442aea | Open Energy Information  

Open Energy Info (EERE)

f7a-6876-4a7d-8e0c-5094b7442aea f7a-6876-4a7d-8e0c-5094b7442aea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: U.S. AIR FORCE Sector: Commercial Description: Qualifying Service All services classified as United States Air Force facilities. Production Cost Adjustments The Government agrees that, if any time after April 1, 1987, that adjustments are made to the District's wholesale cost of power, charges or credits shall be made to this rateaccordingly. Such charges or credits shall be billed separately as "Production Cost Adjustments." If changes are made to the wholesale supplier's power rate for the District, the District reserves the right to change this rate to reflect the wholesale supplier changes. Any changes or adjustments shall be accompanied by written evidence of changes to the wholesale cost of power and shall be made effective with the monthly billing for the Government.

423

Data:C8ace342-22f7-4d2d-af9a-390a67532948 | Open Energy Information  

Open Energy Info (EERE)

42-22f7-4d2d-af9a-390a67532948 42-22f7-4d2d-af9a-390a67532948 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Norcross, Georgia (Utility Company) Effective date: 2008/04/01 End date if known: Rate name: Security Lighting Service (Metal Halide Flood 1,500W Lamp) Sector: Lighting Description: To property owners and tenants in the proximity of low voltage distribution lines of the City of Norcross. Service may be used to illuminate public thoroughfares and/or private outdoor areas, including, but not limited to, roadways, parking lots and yards. Fixture type: Metal Halide Flood Lamp Wattage: 1,500 Monthly Rate: $36.00 per fixture

424

Data:E0909497-c3f7-4ab4-b60a-27018cf4f5cd | Open Energy Information  

Open Energy Info (EERE)

09497-c3f7-4ab4-b60a-27018cf4f5cd 09497-c3f7-4ab4-b60a-27018cf4f5cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 7am-7pm with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

425

Data:2b64246b-efbd-45f7-814c-3134e7e03767 | Open Energy Information  

Open Energy Info (EERE)

4246b-efbd-45f7-814c-3134e7e03767 4246b-efbd-45f7-814c-3134e7e03767 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2013/01/01 End date if known: Rate name: COMMERCIAL/INDUSTRIAL CONTROLLED ACCESS ELECTRIC SERVICE LOW V Sector: Commercial Description: To electric service for commercial/industrial customers for controlled energy storage or other loads which will be energized only for the time period between 11 p.m. and 7 a.m. daily. Service is subject to Company's Electric Service Regulations and any applicable riders. TYPE OF SERVICE Single phase, three phase or single and three phase, 60 hertz, at low voltage (voltage level lower than that available from Company's 13,000 volt system) or high voltage (voltage level equal to or greater than that available from Company's 13,000 volt system), supplied through one meter at one point of delivery. The High Voltage Service Rate is applicable where service is delivered and metered at (or compensated to) the available high voltage level (13,000 volt system or higher).

426

Data:Bc59dde1-fa63-43e4-8c79-f7bfc52fc8d9 | Open Energy Information  

Open Energy Info (EERE)

dde1-fa63-43e4-8c79-f7bfc52fc8d9 dde1-fa63-43e4-8c79-f7bfc52fc8d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Suburban Water Heating Energy Rate Residential Sector: Residential Description: To any customer for separately metered controlled water heating, subject to such wiring rules and regulations as are established by the utility. For as long as the City has costs associated with the ownership of the power plant, these costs shall be recovered through the following power plant cost adjustment factor:$0.01000 for all kWh, all service classes. State of Michigan P.A. 295, of Public Acts 2008, commonly referred to as the Clean, Renewable and Efficient Energy Act mandates the electric utility collect the following charges from each electric utility customer: Residential $0.0021600/kWh. The sum of these charges is reflected in adjustments to the energy charge.

427

Data:1b3cefc3-d72d-40b5-9e0f-7c765b3841a4 | Open Energy Information  

Open Energy Info (EERE)

cefc3-d72d-40b5-9e0f-7c765b3841a4 cefc3-d72d-40b5-9e0f-7c765b3841a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Athletic Field Lighting Sector: Lighting Description: The customer is responsible for the 50pense of installing, owing, and maintaining the field lighting facilities. All new athletic field lighting facilities must be installed, owned, and maintained by the customer. This rate is subject to a Power Cost Adjustment, which is a charge per all kWh that varies monthly. The Commitment to Community Program Rider fee is denoted in the Flat Rate Adjustments Field.

428

Data:4062a6cc-f3c1-49f1-a4a2-df0485f343f7 | Open Energy Information  

Open Energy Info (EERE)

a6cc-f3c1-49f1-a4a2-df0485f343f7 a6cc-f3c1-49f1-a4a2-df0485f343f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule LD Street Lighting - District Owned-175 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places where Schedule LC does not apply and is available to cities, counties, lighting districts or other public bodies where the District furnishes, installs, owns, operates and maintains the complete lighting installation. Monthly Usage: 70kWh

429

Data:85bd8074-daff-4d65-9e0f-3613ae6360f7 | Open Energy Information  

Open Energy Info (EERE)

074-daff-4d65-9e0f-3613ae6360f7 074-daff-4d65-9e0f-3613ae6360f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Avilla, Indiana (Utility Company) Effective date: 2002/04/01 End date if known: Rate name: Rate S: School Service Sector: Commercial Description: Available to public and parochial schools who regularly use the Civil Town of Avila, Indiana, for electric general service so long as the service is located on the utility's distribution lines suitable and adequate for supplying the service. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/25/Town%20of%20Avilla%20Rates.pdf

430

Data:2dee059e-c2f1-4f7e-8db4-cfbe2f76ae3a | Open Energy Information  

Open Energy Info (EERE)

dee059e-c2f1-4f7e-8db4-cfbe2f76ae3a dee059e-c2f1-4f7e-8db4-cfbe2f76ae3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (HPS 400w, Muni Discount) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

431

Data:E80ccb28-f33b-417b-85a2-73b20d0540f7 | Open Energy Information  

Open Energy Info (EERE)

ccb28-f33b-417b-85a2-73b20d0540f7 ccb28-f33b-417b-85a2-73b20d0540f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Washington, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Residential- Inside Corporate Limits- Three-Phase Sector: Residential Description: Service under this Schedule is available for separately metered and billed supply of electricity to single family residences, including residential farms where the farm uses are not taken through a separate meter, and common area residential lighting strictly used for residence owned decorative or security lighting for electric service delivered to premises located within the corporate limits of the City of Washington.

432

Data:E90b5ba5-d41a-4a91-a075-ecb18ed828f7 | Open Energy Information  

Open Energy Info (EERE)

b5ba5-d41a-4a91-a075-ecb18ed828f7 b5ba5-d41a-4a91-a075-ecb18ed828f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Schedule "A" Basic Service, Single Phase, Option S (Seasonal Pricing) Sector: Residential Description: Energy Charge Options - An account will be billed Energy Charges according to its choice of Option Y - Year-round pricing (the default option), Option S - Seasonal pricing, or Option T - Time-of-use pricing. Every twelve months an account is eligible to select a new Energy Charge Option. An account that elects seasonal or time-of-use pricing for the first time may elect a different option upon completion of a six month initial trial period. If a service location has changed hands and been billed under multiple Energy Charge Options during the previous twelve months, REMC reserves the right to require a new account to begin service for the initial twelve months under Option Y - Year-round pricing.

433

Data:50a9e8f0-ad15-46f7-899e-a6a8393df891 | Open Energy Information  

Open Energy Info (EERE)

f0-ad15-46f7-899e-a6a8393df891 f0-ad15-46f7-899e-a6a8393df891 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mazomanie, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0574 per kilowatt-hour.

434

Data:Ce597e1f-a38e-4f7c-9eeb-6e1cfd25983a | Open Energy Information  

Open Energy Info (EERE)

e1f-a38e-4f7c-9eeb-6e1cfd25983a e1f-a38e-4f7c-9eeb-6e1cfd25983a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

435

Data:5333f944-5bcf-4d4d-83da-78f7ef0b79f6 | Open Energy Information  

Open Energy Info (EERE)

f944-5bcf-4d4d-83da-78f7ef0b79f6 f944-5bcf-4d4d-83da-78f7ef0b79f6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/06/01 End date if known: Rate name: Outdoor Lighting Open Bottom HPS 100 W Sector: Lighting Description: *Wood Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $600 per 30 foot wood pole, ii. $625 per 35 foot wood pole, Standard Ornamental Fixtures and Standard Ornamental Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $ 525 per 22 foot fiberglass pole; ii. $1,450 per 35 foot fiberglass pole;

436

Data:61e941b6-7f77-45f7-a2a0-75b1b4977aca | Open Energy Information  

Open Energy Info (EERE)

41b6-7f77-45f7-a2a0-75b1b4977aca 41b6-7f77-45f7-a2a0-75b1b4977aca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Plains Electric Coop Effective date: 2012/02/01 End date if known: Rate name: INTERRUPTIBLE LARGE POWER SERVICE Sector: Commercial Description: Availability Available to any consumer located in a designated urban, rural or reserved land area where the electric load is commercial or a business, and the transformer capacity is 75 KVA or greater. Service is subject to the established rules and regulations of the Cooperative. Type of Service Single or three phase, 60 hertz, at available primary or secondary voltages.Transformer Capacity Charge: $0.47 per KVA for each KVA of required transformer capacity in excess of 15 KVA.

437

Data:A4986fcc-f75a-404f-9fdc-614db53a03f7 | Open Energy Information  

Open Energy Info (EERE)

fcc-f75a-404f-9fdc-614db53a03f7 fcc-f75a-404f-9fdc-614db53a03f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 1990/01/01 End date if known: Rate name: Unmetered Outdoor Lighting- 250W Metal Halide, Flood -Without Pole Sector: Lighting Description: Dusk to dawn unmetered service is covered by charges set forth below which also cover initial installation of overhead lines, poles (where applicable), fixture assembly including four foot mounting hardware for standard luminaries and two foot mounting hardware for flood lights, and maintenance including lamp replacements due to burn outs. Such charges do not cover replacement of lamps, luminaries, brackets or overhead lines which are damaged or destroyed due to vandalism or any other cause beyond the Utility's control, such facilities damaged or destroyed under such circumstances to be replaced by the Utility at the Consumer's expense. Lamp renewals and required maintenance will be performed only during regular daytime working hours as soon as practical after notification by the Consumer of the necessity.

438

Data:0e29685d-b8f7-4761-912f-72ffbfc4e856 | Open Energy Information  

Open Energy Info (EERE)

685d-b8f7-4761-912f-72ffbfc4e856 685d-b8f7-4761-912f-72ffbfc4e856 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2001/10/01 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems (Greater than 20kW) Sector: Description: Available for single-phase and three-phase where part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such requirements of the customer are supplied by the customer's generating facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

439

Data:Dc5d06f3-dd89-4d36-bbe1-fd8b2a3981f7 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:Dc5d06f3-dd89-4d36-bbe1-fd8b2a3981f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: Street Lighting: 175 Watt MV - Single/Steel Sector: Lighting Description: Customer provided Facilities and Cooperative Owned and Maintained Lighting Service. Applies only to lights presently installed. All new street lighting installed shall be H.P. Sodium. As ordinary replacement of Incandescent and Mercury Vapor fixtures is required, they shall be replaced with comparable Sodium fixtures. All fixtures installed shall be subject to meeting municipal or county lighting ordinances.

440

Data:B325f1f7-4d13-44f1-a089-a00a63c17580 | Open Energy Information  

Open Energy Info (EERE)

5f1f7-4d13-44f1-a089-a00a63c17580 5f1f7-4d13-44f1-a089-a00a63c17580 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Mobile home and house trailer park -Individual meters -with Demand Greater than 30 kW Sector: Commercial Description: At any point on the BCLP's interconnected system where there are mobile home and house trailer parks taking electric service under this Schedule as of its effective date. This schedule is for alternating current single-phase electric service to be supplied at BCLP's available voltage through a single point of delivery at the Residential Service Rate for individual meters and at the Commercial Service Rate for master meters.An owner or proprietor receiving single point of delivery electric service under this rate schedule may include the cost of electric service in the rental or lease fee paid by the tenant, or the owner or proprietor may sub-meter each tenant for electric service rendered and bill each tenant their appropriate share of the electric charges based on the master meter billing and the sub-meter readings.

Note: This page contains sample records for the topic "f7 coal demand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:4a576d56-82d4-4c73-a1f7-b8a8c971d781 | Open Energy Information  

Open Energy Info (EERE)

6-82d4-4c73-a1f7-b8a8c971d781 6-82d4-4c73-a1f7-b8a8c971d781 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Flood light MV - 1000W - and 35 foot wood pole Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent: Comments

442

Data:95efde6b-bd2d-4fb4-a8f3-9f7d32b158fe | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:95efde6b-bd2d-4fb4-a8f3-9f7d32b158fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Oklahoma) Effective date: End date if known: Rate name: Irrigation Rate 16 (Demand Discount) Sector: Commercial Description: Rates 14, 16 and 18 for Irrigation Power Service are available in all areas served by the Cooperative. Irrigation Power Service is applicable to accounts where Member is using an electric motor to lift ground water for the purpose of irrigation. A $3.50 per kilowatt demand discount is available during On-Peak months for volunteering to refrain from operating irrigation equipment during the hours of 10:00 am through 10:00 pm each day of the On-Peak season. Under this rate irrigation shall only be allowed during the hours of 10:00 pm and 10:00 am.

443

Japan's Residential Energy Demand Outlook to 2030 Considering Energy Efficiency Standards "Top-Runner Approach"  

E-Print Network (OSTI)

Total Energy Source Demand Coal, Oil, Gas, Heat, Electricity Demography Japan’s population, an important factor in predicting residential energy demand as well

Komiyama, Ryoichi

2008-01-01T23:59:59.000Z

444

Coal - Analysis & Projections - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Short-Term Energy Outlook - Coal Section. Released: December 10, 2013. Short-term coal supply, demand, and price projections. International Energy ...

445

EIA - Annual Energy Outlook 2009 - Energy Demand  

Gasoline and Diesel Fuel Update (EIA)

demand for renewable fuels increasing the fastestincluding E85 and biodiesel fuels for light-duty vehicles, biomass for co-firing at coal-fired electric power plants, and...

446

Data:0050ed89-c983-4cdc-a1a5-1ce6c4d55f7d | Open Energy Information  

Open Energy Info (EERE)

ed89-c983-4cdc-a1a5-1ce6c4d55f7d ed89-c983-4cdc-a1a5-1ce6c4d55f7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln County Power Dist No 1 Effective date: 2012/06/01 End date if known: Rate name: MAIN LINE RATE ADDER - RURAL SYSTEM MLRA-RS Sector: Commercial Description: Applicable to all customers who are located within the Rural System of the Lincoln County Power District No. 1 or who receive electric service under any Rural System rate schedule of the Lincoln County Power District No 1. The Lincoln County Power District No. 1 provides sales for resale and retail electric service throughout Lincoln County, Nevada and a portion of Clark County, Nevada. Electric power is brought into the area over a 69,000 volt transmission line that originates at the Tortoise Substation near Moapa, Nevada and terminates at the Prince Substation near Pioche, Nevada. This transmission line was constructed in 1937. In 1996, the Power District began implementation of a plan to rehabilitate the aged structures in this transmission line. To date, structures in approximately 67 miles of the transmission line have been replaced. Approximately 47 miles of line remain to be restored at an estimated cost of $3.8 million in 2012 dollars. This Main Line Rate Adder is implemented to assist in funding the completion of structure repairs in a timely manner.

447

Data:F05caa40-c8f7-4c90-ba0d-995b9fcbce19 | Open Energy Information  

Open Energy Info (EERE)

caa40-c8f7-4c90-ba0d-995b9fcbce19 caa40-c8f7-4c90-ba0d-995b9fcbce19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln County Power Dist No 1 Effective date: 2012/06/01 End date if known: Rate name: MAIN LINE RATE ADDER - URBAN SYSTEM MLRA-US Sector: Commercial Description: Applicable to all customers who are located within the Urban System of the Lincoln County Power District No. 1 or who receive electric service under any Urban System rate schedule of the Lincoln County Power District No. 1. PURPOSE: The Lincoln County Power District No. 1 provides sales for resale and retail electric service throughout Lincoln County, Nevada and a portion of Clark County, Nevada. Electric power is brought into this area over a 69,000 volt transmission line that originates at the Tortoise Substation near Moapa, Nevada and terminates at the Prince Substation near Pioche, Nevada. This transmission line was constructed in 1937. In 1996, the Power District began implementation of a plan to rehabilitate the aged structures in this transmission line. To date, structures in approximately 67 miles of the transmission line have been replaced. Approximately 47 miles of line remain to be restored at an estimated cost of $3.8 million in 2012 dollars. This Main Line Rate Adder is implemented to assist in funding the completion of structure repairs in a timely manner.

448

Data:C6c3ac7b-40f7-480e-8a72-f3b00edbd19c | Open Energy Information  

Open Energy Info (EERE)

c3ac7b-40f7-480e-8a72-f3b00edbd19c c3ac7b-40f7-480e-8a72-f3b00edbd19c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/15 End date if known: Rate name: Experimental Advanced Renewable Energy Purchase Service (Tier 3: Biomass/Biogas 5 MW Community-based Projects Only) Sector: Descripti