Powered by Deep Web Technologies
Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

1999 Commercial Buildings Characteristics--Year Constructed  

U.S. Energy Information Administration (EIA) Indexed Site

Year Constructed Year Constructed Year Constructed More than one-third (37 percent) of the floorspace in commercial buildings was constructed since 1980 and more than one-half (55 percent) after 1969 (Figure 1). Less than one-third of floorspace was constructed before 1960. Detailed tables Figure 1. Distribution of Floorspace by Year Constructed, 1999 Figure 1. Distribution of Floorspace by Year Constructed, 1999. If having trouble viewing this page, please contact the National Energy Information Center at (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Overall, relatively more buildings than floorspace were represented in the older age categories and more floorspace than buildings in the newer categories (see graphical comparison) because older buildings were smaller than more recently constructed buildings (Figure 2). Buildings constructed prior to 1960 were 11,700 square feet in size on average while those constructed after 1959 were 37 percent larger at 16,000 square feet per building.

2

SCP06F3  

NLE Websites -- All DOE Office Websites (Extended Search)

F3 F3 See Barbary et al. (2011) for details. Aperture photometry on this page is for diagnostic purposes only. See Suzuki et al. (2011) for photometry and cosmology analysis. Data Lightcurve Local Environment : Stacked color image Pixel Position (3979.54 , 2334.25) Gaussian fit RA,DEC (14:32:26.319 , +33:32:11.31) Cluster Offset 51.1 arcsec Redshift Unknown Redshift from Cluster Redshift 1.11 Found with uniform selection Yes Lightcurve Cut 1, 2, 3 PASS, PASS, PASS Classification AGN Typing based on Discovery 1 ep = 05 (3979.41,2334.32) mag = 24.146 apsig = 11.051 Discovery 2 ep = 06 (3979.67,2334.18) mag = 24.379 apsig = 9.147 Host Distance 0.050 arcsec ( 0.99 pixels) Host z850 22.68 Host i775 - z850 0.15 Flux in a 3 pixel radius aperture, including host galaxy light. Hover-over shows: MAG_AUTO z850 ( aperture i775 - z850 )

3

Property:Building/YearConstruction2 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction2 YearConstruction2 Jump to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "Building/YearConstruction2" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1921 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 +

4

Property:Building/YearConstruction1 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction1 YearConstruction1 Jump to: navigation, search This is a property of type Date. Year of construction 1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "Building/YearConstruction1" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 27 June 2013 21:11:42 + Sweden Building 05K0003 + 27 June 2013 21:10:49 + Sweden Building 05K0005 + 27 June 2013 21:11:38 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1972 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 2004 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1992 +

5

Property:Building/YearConstruction | Open Energy Information  

Open Energy Info (EERE)

YearConstruction YearConstruction Jump to: navigation, search This is a property of type Date. Year of construction Pages using the property "Building/YearConstruction" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 + Sweden Building 05K0017 + 1987 +

6

Buildings","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B9. Year Constructed, Floorspace, 1999" B9. Year Constructed, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",67338,4034,6445,9127,10866,11840,13931,11094 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,655,798,1025,928,1056,1153,1159 "5,001 to 10,000 ..............",8238,791,776,1777,1165,1392,1150,1188 "10,001 to 25,000 .............",11153,972,1504,1488,1267,2045,2767,1110 "25,001 to 50,000 .............",9311,489,673,1343,1987,1587,1594,1638

7

Table B8. Year Constructed, Number of Buildings, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings, 1999" B8. Year Constructed, Number of Buildings, 1999" ,"Number of Buildings (thousand)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",4657,419,499,763,665,774,846,690 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,227,270,359,321,367,413,390 "5,001 to 10,000 ..............",1110,107,102,240,166,193,156,145 "10,001 to 25,000 .............",708,63,90,97,84,130,179,65 "25,001 to 50,000 .............",257,13,20,39,53,44,43,44 "50,001 to 100,000 ............",145,7,9,19,24,26,33,27

8

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2003" "All Buildings* ...............",4645,330,527,562,579,731,707,876,334 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,174,315,331,298,350,438,481,165 "5,001 to 10,000 ..............",889,71,107,90,120,180,98,158,66 "10,001 to 25,000 .............",738,55,64,90,95,122,103,151,58 "25,001 to 50,000 .............",241,19,23,26,33,48,32,39,21

9

AOCS Official Method F 3-44  

Science Conference Proceedings (OSTI)

Total Desulfated Fatty Matter AOCS Official Method F 3-44 Methods Methods and Analyses Analytical Chemistry Methods Downloads Methods Downloads DEFINITION This method determines the total desulfated fatty matte

10

KT Monograph Section F3 Fish Data figures  

E-Print Network (OSTI)

#1; F3:1 - Size distribution of all the cyprinids #1; F3:2 - Percentage contribution of Anatolian freshwater fish, marine species and exotic freshwater fish through time. The sample size is indicated in brackets F3: Fish 1 31/8/04 ... F3: Fish 1 19/4/yy 0 10 20 30 5-10 10-15 15-20 20-25 25-30 30-35 35-40 standard length in cm n F3:1 - Size distribution of all the cyprinids 0 20 40 60 80 100 Bronze Age (n=27) Iron Age (n=74) Byzantine (n=28) Anatolian Marine Exotic F3...

Waelkens, M; Van Neer, W

2004-08-30T23:59:59.000Z

11

Table HC1-2a. Housing Unit Characteristics by Year of Construction,  

U.S. Energy Information Administration (EIA) Indexed Site

2a. Housing Unit Characteristics by Year of Construction, 2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 2001 Housing Unit Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.5 1.6 1.2 1.0 1.1 1.1 0.8 Total ............................................... 107.0 15.5 18.2 18.8 13.8 14.2 26.6 4.3 Census Region and Division Northeast ...................................... 20.3 1.5 2.4 2.1 2.8 3.0 8.5 8.8 New England .............................. 5.4 0.4 0.7 0.4 0.8 0.9 2.3 11.3 Middle Atlantic ............................ 14.8 1.1 1.7 1.7 2.0 2.2 6.2 11.2 Midwest ......................................... 24.5 2.8 3.7 3.6 2.9 3.5 8.1 10.2 East North Central ...................... 17.1 2.0 2.5 2.5 2.0 2.6 5.5 11.9

12

MEMORANDUM TO: FILE F3on: A 6 IL  

Office of Legacy Management (LM)

F3on: A 6 IL F3on: A 6 IL ---A------------ ALTERNATE CITY: l4v+&a ------- _-__------___-___ STATE: -~-~-- if yes, date contacted _____ & Development a Facility Type 0 Prndurtion scale testing 0 Pilot Scale 0 Makfacturing .a Bench Scale 0 0 Process University 0 0 Theoretical Studies Reseaich Organization cl Sample & Analysis 0 Gopernment Sponsored Facility 0 Other -~~-~~~--_-~~-__----- 0 Production I 0 Disposal/Storage TYPE OF CONTRACT ~------__--_____ q Prime q Subcontract& u Purchase Order Cl Other'infcrmation (i.e., cost + fixed fee, unit price; time & material, +r) ------- ' 'Con+act/Purchase Order # nls.vP ---------------------------- --------------------_____________ CONTRACTING P=3IOD- -----------w-=---T- h,Jn<, ------------------------------- _

13

Critical point of N{sub f}=3 QCD from lattice simulations in the canonical ensemble  

Science Conference Proceedings (OSTI)

A canonical ensemble algorithm is employed to study the phase diagram of N{sub f}=3 QCD using lattice simulations. We lock in the desired quark number sector using an exact Fourier transform of the fermion determinant. We scan the phase space below T{sub c} and look for an S-shape structure in the chemical potential, which signals the coexistence phase of a first order phase transition in finite volume. Applying Maxwell construction, we determine the boundaries of the coexistence phase at three temperatures and extrapolate them to locate the critical point. Using an improved gauge action and improved Wilson fermions on lattices with a spatial extent of 1.8 fm and quark masses close to that of the strange, we find the critical point at T{sub E}=0.925(5)T{sub c} and baryon chemical potential {mu}{sub B}{sup E}=2.60(8)T{sub c}.

Li Anyi [Department of Physics, Duke University, Durham, North Carolina 27708 (United States); Alexandru, Andrei [Physics Department, The George Washington University, Washington D.C. 20052 (United States); Liu, Keh-Fei [Department of Physics and Astronomy, University of Kentucky, Lexington, Kentucky 40506 (United States)

2011-10-01T23:59:59.000Z

14

Data:233bd1f3-2001-4823-9a9f-026218b35abd | Open Energy Information  

Open Energy Info (EERE)

bd1f3-2001-4823-9a9f-026218b35abd bd1f3-2001-4823-9a9f-026218b35abd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Mercury Vapor, 7200 Lumen, 175 watts, Class B Sector: Lighting Description: Class B: Mercury Vapor Lamps or Sodium Vapor Lamps on standard overhead wood pole construction, owned and operated by utility. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

15

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

"District Heat ...",5166,"Q",1203,661,786,573,780,691,"Q" "Boilers ...",20423,1926,2744,3081,2957,3339,2803,2257,1316 "Packaged...

16

Data:Ecd876f3-f3c7-446e-96cf-c2410789d1dc | Open Energy Information  

Open Energy Info (EERE)

Ecd876f3-f3c7-446e-96cf-c2410789d1dc Ecd876f3-f3c7-446e-96cf-c2410789d1dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Commercial-Single Phase Sector: Residential Description: Less than 50kW Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

17

Data:5a9e11ab-f3dc-45a6-bb11-b12f3c380de8 | Open Energy Information  

Open Energy Info (EERE)

e11ab-f3dc-45a6-bb11-b12f3c380de8 e11ab-f3dc-45a6-bb11-b12f3c380de8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MV 175 W Underground (Includes Pole) Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability

18

Data:8934e49b-6d95-4804-a563-a9f3f3e3da48 | Open Energy Information  

Open Energy Info (EERE)

b-6d95-4804-a563-a9f3f3e3da48 b-6d95-4804-a563-a9f3f3e3da48 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc Effective date: End date if known: Rate name: HPS Security Light Sector: Lighting Description: *Dusk-to-dawn security lighting Source or reference: http://www.fec-co.com/svcmembers.htm#securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

19

Microsoft Word - 15F3F361.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

5.1-1 5.1-1 5. TUSCOLA SITE 5.1 CHAPTER OVERVIEW This chapter provides information regarding the affected environment and the potential for impacts on each resource area in relation to construction and operation of the FutureGen Project at the proposed Tuscola Site. To aid the reader and to properly address the complexity of the FutureGen Project, as well as the need to evaluate four sites (two in Illinois and two in Texas), this Environmental Impact Statement (EIS) was prepared as two separate volumes. Volume I of the EIS includes the purpose and need for the agency action, a description of the Proposed Action and Alternatives, and a summary of the potential environmental consequences. Volume II addresses the affected environment and potential impacts for

20

Gravel road test sections insulated with scrap tire chips: Construction and the first year's results. Special report  

Science Conference Proceedings (OSTI)

A test project that uses tire chips as an insulating layer to limit frost penetration beneath a gravel-surfaced road is described. Tire chips, which are waste tires that have been cut into 2-in. pieces, are an attractive alternative to conventional insulation boards because they have moderate thermal resistance and are durable, free-draining and low cost. Furthermore, this application has the potential to make an important contribution to disposing of the more than 2 billion waste tires that are currently sitting in huge open piles across the U.S. The project was constructed in Richmond, Maine, in August 1992. It is 750 ft long, consisting of five sections with different thicknesses of tire chips and overlying soil cover and two control sections. Over 20,000 waste tires were used on this project. The primary goals were to determine the necessary thickness of tire chips to provide effective insulation and the minimum thickness of overlying soil cover needed to produce a stable riding surface. The thickness of the tire chip layers ranges from 6 to 12 in., while the thickness of the granular soil cover ranges from 12 to 24 in. The project is instrumented with thermocouples, resistivity gauges, groundwater monitoring wells and a weather station. In addition, the strength of the road surface is periodically measured with a heavy weight deflectometer. Results from the first year of service have shown that a 6-in. tire chip layer can reduce frost penetration by up to 25% and the gravel cover should be 12 to 18 in. thick to provide a stable riding surface.

Eaton, R.A.; Roberts, R.J.; Humphrey, D.N.

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Data:B42d40f3-f3d0-4762-acfb-06a86c518c44 | Open Energy Information  

Open Energy Info (EERE)

B42d40f3-f3d0-4762-acfb-06a86c518c44 B42d40f3-f3d0-4762-acfb-06a86c518c44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Churches Time of Use Sector: Commercial Description: *Availability to Churches only, for all uses including lighting, air conditioning, heating and power, subject to the established rules and regulations. Adjustment includes power cost adjustment rider and tax expense adjustment rider The minimum monthly charge under the above rate shall be the daily service charge of $1.14 multiplied by the number of days in th ebilling cycle pllus $3.00 per kW of billed demand.

22

Data:769759f3-1be6-4bf4-8390-f3c1d17c852d | Open Energy Information  

Open Energy Info (EERE)

59f3-1be6-4bf4-8390-f3c1d17c852d 59f3-1be6-4bf4-8390-f3c1d17c852d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Blue Earth, Minnesota (Utility Company) Effective date: End date if known: Rate name: Wind Power Supporter Sector: Description: Sold on a per block basis $2.00 per 100 kWh block = $0.02 per kWh Source or reference: http://www.belw.org/Rate Source Parent: Comments Must buy in increments of 100 kWh blocks @ $2.00 per block Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

23

Data:831a3fae-8ea2-4bf8-965f-3f3dd886bf1c | Open Energy Information  

Open Energy Info (EERE)

fae-8ea2-4bf8-965f-3f3dd886bf1c fae-8ea2-4bf8-965f-3f3dd886bf1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sullivan, Illinois (Utility Company) Effective date: 2012/11/13 End date if known: Rate name: Industrial Power - 200,000 KWH or Above Usage Per Month - Three Phase - 30-150 kva - Outside City Limit Sector: Description: The City of Sullivan will determine the Power Factor each month and if found to be less than ninety percent (90%), the monthly demand charge may be increased by an amount equal to Twenty Cents ($0.20) per KWH of Demand for each percent, or fraction thereof, for each percent less than ninety percent (90%).

24

Data:8fac01a0-76ee-48f3-8f3f-6cc62ec32199 | Open Energy Information  

Open Energy Info (EERE)

fac01a0-76ee-48f3-8f3f-6cc62ec32199 fac01a0-76ee-48f3-8f3f-6cc62ec32199 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 175 Wattage (Underground) MV 75 kWh (without pole) Sector: Lighting Description: Source or reference: http://psc.ky.gov/tariffs/Electric/Salt%20River%20Electric%20Coop.%20Corp/Tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

25

Data:37f3d550-fae7-47f6-8e01-1580af1228f3 | Open Energy Information  

Open Energy Info (EERE)

d550-fae7-47f6-8e01-1580af1228f3 d550-fae7-47f6-8e01-1580af1228f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Electric Power Co (Louisiana) Effective date: 2013/03/01 End date if known: Rate name: Municipal Street and Parkway Lighting - Closed offering - 400 Watt MV Energy Only Sector: Lighting Description: Source or reference: http://www.swepco.com/global/utilities/lib/docs/ratesandtariffs/Louisiana/LouisianaA_06_06_2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

26

Data:F3a63749-27ec-4a19-aa6c-55f3d325a675 | Open Energy Information  

Open Energy Info (EERE)

-27ec-4a19-aa6c-55f3d325a675 -27ec-4a19-aa6c-55f3d325a675 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Company-Owned Fixture - Shoe Box 150 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

27

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

28

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

29

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

30

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

31

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

32

Data:B3290c0a-ad32-40ed-94f3-b0060fab65f5 | Open Energy Information  

Open Energy Info (EERE)

90c0a-ad32-40ed-94f3-b0060fab65f5 90c0a-ad32-40ed-94f3-b0060fab65f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/06/01 End date if known: Rate name: Outdoor Lighting Cobrahead HPS 400 W Sector: Lighting Description: *Wood Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $600 per 30 foot wood pole, ii. $625 per 35 foot wood pole, Standard Ornamental Fixtures and Standard Ornamental Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $ 525 per 22 foot fiberglass pole; ii. $1,450 per 35 foot fiberglass pole;

33

Electrical Conductivity of the KF-NaF- AlF3 Molten System at Low ...  

Science Conference Proceedings (OSTI)

The electrical conductivity of the NaF-KF-AlF3 system at CR=1.3-1.7 was ... Experimental Investigation of Single Bubble Characteristics in a Cold Model of a ... Impact of Amperage Creep on Potroom Busbars and Electrical Insulation:...

34

Enhanced performance of graphite anode materials by AlF3 coating for lithium-ion batteries  

Science Conference Proceedings (OSTI)

In order to form the stable surface film and to further enhance the long-term cycling stability of the graphite anodes of lithium-ion batteries, the surface of graphite powders has been modified by AlF3 coating through chemical precipitation method. The AlF3-coated graphite shows no evident changes in the bulk structure and a thin AlF3-coating layer of about 2 nm thick is found to uniformly cover the graphite particles with 2 wt% AlF3 content. However, it delivers a higher initial discharge capacity and largely improved rate performances compared to the pristine graphite. Remarkably, AlF3 coated graphite demonstrated a much better cycle life. After 300 cycles, AlF3 coated graphite and uncoated graphite show capacity retention of 92% and 81%, respectively. XPS measurement shows that a more conductive solid electrode interface (SEI) layer was formed on AlF3 coated graphite as compared to uncoated graphite. SEM monograph also reveals that the AlF3-coated graphite particles have a much more stable surface morphology after long-term cycling. Therefore, the improved electrochemical performance of AlF3 coated graphite can be attributed to a more stable and conductive SEI formed on coated graphite anode during cycling process.

Ding, Fei; Xu, Wu; Choi, Daiwon; Wang, Wei; Li, Xiaolin; Engelhard, Mark H.; Chen, Xilin; Yang, Zhenguo; Zhang, Jiguang

2012-04-27T23:59:59.000Z

35

Data:C7bfd42f-3e31-44a0-8534-a813ccb882e3 | Open Energy Information  

Open Energy Info (EERE)

bfd42f-3e31-44a0-8534-a813ccb882e3 bfd42f-3e31-44a0-8534-a813ccb882e3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Princeton Public Utils Comm Effective date: 2010/02/01 End date if known: Rate name: 1500W Quartz Sector: Commercial Description: For year-round illumination for area and security lighting by electric lamps in luminaries supported on wood poles, where the facilities for the service are furnished by the utility. Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

36

Data:1abc67f8-07c2-44f3-8bec-c31199ccdab2 | Open Energy Information  

Open Energy Info (EERE)

abc67f8-07c2-44f3-8bec-c31199ccdab2 abc67f8-07c2-44f3-8bec-c31199ccdab2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Ellwood City, Pennsylvania (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Industrial Schedule Primary Service Sector: Industrial Description: Available for general industrial and commercial power service furnished through one meter for each installation to any customer with a metered demand for 50 kVA or greater, subject to the established rates and regulations of the Borough. The minimum time period for service under this rate is one year.

37

Data:Acecb2a1-0762-49fe-90f3-106fdcb39aa0 | Open Energy Information  

Open Energy Info (EERE)

Acecb2a1-0762-49fe-90f3-106fdcb39aa0 Acecb2a1-0762-49fe-90f3-106fdcb39aa0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Parke County Rural E M C Effective date: 2012/04/01 End date if known: Rate name: Yard Light Service: Mercury Vapor 1000W Sector: Lighting Description: Parke County REMC shall charge and collect for Yard and/or Street lighting service based on availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of Parke County REMC for continuous, year-round service for out- door lighting where120 volt service exists ahead of the meter loop.

38

Data:0ce80cbf-29f3-48ad-981f-feee82e7aadb | Open Energy Information  

Open Energy Info (EERE)

ce80cbf-29f3-48ad-981f-feee82e7aadb ce80cbf-29f3-48ad-981f-feee82e7aadb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2013/04/01 End date if known: Rate name: 2 Cotton Ginning service (CGS) Sector: Commercial Description: To electric power service, including incidental lighting where customer furnished and maintains necessary equipment to reduce service voltage to lighting voltage, supplied through one meter at one point of delivery for the ginning of cotton during the year beginning March 16. Source or reference: http://www.entergy-arkansas.com/content/price/tariffs/eai_cgs.pdf

39

Data:E632ecdb-c77a-46f5-9c70-d932f3e0057a | Open Energy Information  

Open Energy Info (EERE)

2ecdb-c77a-46f5-9c70-d932f3e0057a 2ecdb-c77a-46f5-9c70-d932f3e0057a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Surry-Yadkin Elec Member Corp Effective date: End date if known: Rate name: SSI Supplemental Security Service Sector: Lighting Description: Surry-Yadkin EMC offers a special SSI rate to its residential members who meet ALL of the following requirements: Receive Supplemental Security Income (SSI) assistance from the Social Security Administration (a gold colored check). Are blind, or disabled, or 65 years of age or older. Are a member of Surry-Yadkin EMC receiving residential electric service in your name.

40

Data:793b9036-c6d7-4f3c-83d2-0054ed12d1fa | Open Energy Information  

Open Energy Info (EERE)

b9036-c6d7-4f3c-83d2-0054ed12d1fa b9036-c6d7-4f3c-83d2-0054ed12d1fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Public Street Lighting Service, Sodium Lamps, 27,000 Lumens, 250W (Existing Wood Pole) Sector: Lighting Description: The above rates for Standard Public Street Lighting Service are based on the costs of standard overhead service and standard wood poles. The Customer will be required to pay a one-time contribution-in-aide-of construction (CIAC) to cover the additional costs of any non-standard lighting service requested by the Customer. Non-standard public street lighting service consists of installations requiring more than one wood pole and special poles, transformers, line extensions, non-standard fixtures and lamps, or underground service. The CIAC shall be based on the difference between the cost to provide standard service and the actual cost of the non-standard service as per current standard cost .

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:5799bbde-f3a9-4d53-96ac-552ac0d3bad4 | Open Energy Information  

Open Energy Info (EERE)

bbde-f3a9-4d53-96ac-552ac0d3bad4 bbde-f3a9-4d53-96ac-552ac0d3bad4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Secondary Service - Greater than 10 kVa, Non-IDR Metered, less than 400 kVa (TC-MGS) - Muni Discount Rate Sector: Commercial Description: Delivery Service will be single-phase, 60 hertz, at a standard secondary voltage. Delivery Service will be metered using Company's standard watt-hour Meter provided for this type of Delivery Service. Any other metering option(s) will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, in this Tariff.

42

Data:D3047f3d-80d9-413e-aa32-cb915d7718b4 | Open Energy Information  

Open Energy Info (EERE)

f3d-80d9-413e-aa32-cb915d7718b4 f3d-80d9-413e-aa32-cb915d7718b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Chelan County Effective date: 2012/01/01 End date if known: Rate name: Stehekin Small Industrial Small General Service Sector: Industrial Description: AVAILABILITY: This schedule is available in the Stehekin area, and is available to commercial, small industrial, farm power and applicable multiple-residential light, heat and power customers. CHARACTER OF SERVICE: 1. Service to be furnished under this schedule may be either single phase, three phase or four wire three phase, 60 cycle, alternating current at available phase and voltage. 2. Temporary service for commercial construction shall be supplied under this schedule. METERING: Where any customer requires service through two or more meters whether service is of similar or dissimilar class, each meter shall be billed independently.

43

Data:238509f3-8ed2-4bb8-a32b-c427b9eeec4e | Open Energy Information  

Open Energy Info (EERE)

9f3-8ed2-4bb8-a32b-c427b9eeec4e 9f3-8ed2-4bb8-a32b-c427b9eeec4e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Primary Service - IDR Metered, less than 400 kVa (TC-MGS) - Muni Discount Rate Sector: Commercial Description: Delivery Service will be single or three-phase, 60 hertz, at a standard primary voltage. Delivery Service will be metered using Company's standard Meter provided for this type of Delivery Service. Any Meter other than the standard Meter will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, of this Tariff.

44

Data:70072f3e-be48-45b2-aada-9e072e764828 | Open Energy Information  

Open Energy Info (EERE)

2f3e-be48-45b2-aada-9e072e764828 2f3e-be48-45b2-aada-9e072e764828 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Commercial space heating- Single meter Sector: Commercial Description: Service under this price is available for commercial premises on the existing B-1 rate with an electric resistance heating system, an electric heat pump system or an electric storage space heating system that is capable of heating 50% or more of the premises. This service is available for commercial establishments that have not installed separate metering for heating loads, and is not available for new construction. The Company reserves the right to inspect any facility to ensure eligibility under this price schedule. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

45

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likel

Bechtel Jacobs

2008-09-11T23:59:59.000Z

46

Data:D2ec604f-36b7-4681-a8f3-7115a341056a | Open Energy Information  

Open Energy Info (EERE)

ec604f-36b7-4681-a8f3-7115a341056a ec604f-36b7-4681-a8f3-7115a341056a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Reading, Massachusetts (Utility Company) Effective date: 2011/08/01 End date if known: Rate name: 100 WATT MERCURY UG Sector: Lighting Description: *Note: Incandescent and Mercury lamps will no longer be supplied for new installations. Fixed Monthly Charge= Annual Rate divided by 12 months. Extra Pole Cost When an extra pole is required, specifically for street lighting, there will be an extra cost based upon pole size, including up to 100 feet of secondary. 30 foot or 35 foot Class 4 pole is $44.00 per year

47

Data:Aa9dd740-cdae-445b-a7de-ecc67a4f3a7d | Open Energy Information  

Open Energy Info (EERE)

dd740-cdae-445b-a7de-ecc67a4f3a7d dd740-cdae-445b-a7de-ecc67a4f3a7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Chelan County Effective date: 2012/01/01 End date if known: Rate name: FROST PROTECTION MACHINES Sector: Commercial Description: This schedule applies to seasonal frost protection equipment services during the months of March through June of each year. Electrical energy is not available for inter-seasonal use during the months of July through February. Electrical energy for frost protection machines is NOT AVAILABLE for inter-seasonal use for the months of JULY THROUGH FEBRUARY. Electrical energy is ONLY AVAILABLE for seasonal use for the months of MARCH THROUGH JUNE.

48

Data:699deb08-94f3-4a8f-80eb-8a49d74961ad | Open Energy Information  

Open Energy Info (EERE)

deb08-94f3-4a8f-80eb-8a49d74961ad deb08-94f3-4a8f-80eb-8a49d74961ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: General Service - Primary Rate Sector: Industrial Description: Peak Hours: On-peak hours are 6:00am-10:00pm during periods of the year when Eastern Standard Time is in effect, and 9:00am-10:00pm when Eastern Daylight Savings time is in effect, Monday through Friday, including holidays falling on weekdays. All other hours are off-peak hours. Power Factor Charge or Credit: $0.029521/kW (interpreted below)

49

Data:61340211-854b-43f3-8d3b-482b9651eb87 | Open Energy Information  

Open Energy Info (EERE)

211-854b-43f3-8d3b-482b9651eb87 211-854b-43f3-8d3b-482b9651eb87 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-1TOD; Small Power Optional Time-of-Day Service-Transformer Ownership Discount with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: This rate schedule is optional to all Cp-1 customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

50

Data:8c69753f-d785-46ca-a22d-f3aa627bdd1a | Open Energy Information  

Open Energy Info (EERE)

d785-46ca-a22d-f3aa627bdd1a d785-46ca-a22d-f3aa627bdd1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Maine Power Co Effective date: 2012/07/01 End date if known: Rate name: AL Discontinued Lighting-High Pressure Sodium Enclosed 400 watts Sector: Lighting Description: This rate is available for area lighting service furnished on a dusk-to-dawn basis. The Company will furnish, install and maintain area lights in new locations as may be requested in writing for area lighting service, subject to the TERM OF SERVICE specified below. TERM OF SERVICE The term of service under this schedule shall be by service agreement for a period of fifteen (15) years and on a continuing basis thereafter. Requests for additions, changes or removals for area lighting service may require 90 days' advance written notice.

51

Data:Ba0f3eda-174c-4c9a-b225-2e529b0669d7 | Open Energy Information  

Open Energy Info (EERE)

f3eda-174c-4c9a-b225-2e529b0669d7 f3eda-174c-4c9a-b225-2e529b0669d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: Cg-1 (Time Of Day Three Phase) Sector: Commercial Description: Availability: Available to non-residential customers for single- or three- phase electric service. Not available for customers with a maximum demand of 25 kW or greater. Availability is at discretion of Company and is subject to the ability of Company to obtain and install required metering equipment. Company agrees to keep this schedule or a similar schedule available to customers for a minimum of five years. If customer moves, both original and new customers have the option to retain time-of-day billing or to transfer to Small General Service Rate Schedule Cg-2. Energy Cost Adjustment: Bills subject to the adjustment provided for in Energy Cost Adjustment. See schedule X-1, Sheet No. E 63.

52

Data:A9a064f3-f21b-4283-8d0f-272625336635 | Open Energy Information  

Open Energy Info (EERE)

a064f3-f21b-4283-8d0f-272625336635 a064f3-f21b-4283-8d0f-272625336635 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Indiana (Utility Company) Effective date: 1997/10/27 End date if known: Rate name: OL Outdoor Lighting 400 watt Sodium Vapor Sector: Lighting Description: Available only for continuous year-round service for outdoor lighting to any residential, farm, commercial, or industrial customer located adjacent to an electric distribution line of utility. Outdoor lighting service using lamps available under this schedule and controlled by a photoelectric relay. Source or reference: http://www.amlegal.com/nxt/gateway.dll/Indiana/frankfort_in/cityoffrankfortindianacodeofordinances?f=templates$fn=default.htm$3.0$vid=amlegal:frankfort_in

53

Data:Fe2e1481-4c8e-41aa-8b75-6e8741d689f3 | Open Energy Information  

Open Energy Info (EERE)

81-4c8e-41aa-8b75-6e8741d689f3 81-4c8e-41aa-8b75-6e8741d689f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2000/11/01 End date if known: Rate name: Public Lighting Service Rate - Schedule PL-1 - 300 watts Sector: Lighting Description: Available to all customers for dusk to dawn outdoor lighting of public streets, thoroughfares or grounds through a system owned and maintained by the District. Special Poles $0.75 per month. Special Conditions: The District and the customer shall execute an agreement for periods of not less than five years for service hereunder. The installation of facilities for public lighting services shall be done according to the District's Line Extension Policy. The District may not be required to install additional lights to a lighting system served hereunder during the last six months of a term contract, unless said contract is immediately renewed for a like contract period. This schedule is not available to consumers who own and maintain their own system.

54

Data:77cbc68c-c5d6-4274-9359-fe6ce217f3fc | Open Energy Information  

Open Energy Info (EERE)

cbc68c-c5d6-4274-9359-fe6ce217f3fc cbc68c-c5d6-4274-9359-fe6ce217f3fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Reading, Massachusetts (Utility Company) Effective date: 2011/08/01 End date if known: Rate name: 400 WATT MERCURY Sector: Lighting Description: *Note: Incandescent and Mercury lamps will no longer be supplied for new installations. Fixed Monthly Charge= Annual Rate divided by 12 months. Extra Pole Cost When an extra pole is required, specifically for street lighting, there will be an extra cost based upon pole size, including up to 100 feet of secondary. 30 foot or 35 foot Class 4 pole is $44.00 per year

55

Data:8c860c90-07f3-49e4-beb5-4de1beb10573 | Open Energy Information  

Open Energy Info (EERE)

60c90-07f3-49e4-beb5-4de1beb10573 60c90-07f3-49e4-beb5-4de1beb10573 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights Metered 100 watt high pressure sodium Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

56

Data:23d21e27-c62e-48c8-8f3c-ab726c8253fe | Open Energy Information  

Open Energy Info (EERE)

7-c62e-48c8-8f3c-ab726c8253fe 7-c62e-48c8-8f3c-ab726c8253fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2012/01/01 End date if known: Rate name: GSXLD-GS Sector: Description: To any customers who have executed a ten year General Service Extra Large Demand Electric Service Agreement with JEA and whose existing account is no less than 25,000 kW demand or whose existing multiple accounts in aggregate are no less than 25,000 kW demand. Resale of energy purchased under this rider/rate schedule is not permitted. Source or reference: https://www.jea.com/About_Us/Tariffs_and_Reports/Tariffs_and_Reports.aspx

57

Data:10add6f3-94ef-463e-8151-e36f7f6ee4c0 | Open Energy Information  

Open Energy Info (EERE)

f3-94ef-463e-8151-e36f7f6ee4c0 f3-94ef-463e-8151-e36f7f6ee4c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights 400 watt high pressure sodium Direct/120v(Non-metered) Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

58

Data:23ea47ec-52f3-46ab-853f-1680a72fd420 | Open Energy Information  

Open Energy Info (EERE)

ea47ec-52f3-46ab-853f-1680a72fd420 ea47ec-52f3-46ab-853f-1680a72fd420 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kosciusko County Rural E M C Effective date: 2010/10/01 End date if known: Rate name: Distributed Generation-Schedule DG Sector: Commercial Description: AVAILABILITY Available for Net Billing Service to members receiving or qualifying for service under Schedule RF or Schedule C with qualifying renewable energy source generation facilities designed to operate in parallel with the Kosciusko Rural Electric Membership Corporation (KREMC) system. The total rated generating capacity of all net billing members served under this rate schedule shall be limited to five tenths of one percent (0.5%) of KREMC's previous year's peak demand in kW. Service under this rate schedule shall be available to members on a first come, first served basis.

59

Data:Acb8608d-9d8c-452c-a65f-0f3d6379a63f | Open Energy Information  

Open Energy Info (EERE)

Acb8608d-9d8c-452c-a65f-0f3d6379a63f Acb8608d-9d8c-452c-a65f-0f3d6379a63f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Austin, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: City Street Lighting 400 Watt High-Pressure Sodium Lamp Sector: Lighting Description: APPLICABLE: For the City of Austin municipal street lighting as determined by the City of Austin. Street Lighting unit burning time is limited to dusk to daylight (approximately 4,400 hrs. per year). CHARACTER OF SERVICE: 120/240 Volts, AC, as available. Source or reference: http://austinutilities.com/pages/aboutUs_rates.asp

60

Data:A2db3312-b61f-4ccf-8b3f-3b52b8babd6e | Open Energy Information  

Open Energy Info (EERE)

db3312-b61f-4ccf-8b3f-3b52b8babd6e db3312-b61f-4ccf-8b3f-3b52b8babd6e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service - Optional Time-of-Day Single-Phase 8am-8pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Rg-2 Residential Service Optional TOD $1.00 per customer per month

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:D664a7f3-3b0b-4fb5-8819-42a14c35f3b7 | Open Energy Information  

Open Energy Info (EERE)

f3-3b0b-4fb5-8819-42a14c35f3b7 f3-3b0b-4fb5-8819-42a14c35f3b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Central Public Pwr Dist Effective date: 2013/01/01 End date if known: Rate name: 61- Large Power - Leased Area - Energy Sector: Description: Source or reference: http://www.ncppd.com/rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

62

Data:E48e4f3a-523b-4ba6-82ce-b4f3c37ee218 | Open Energy Information  

Open Energy Info (EERE)

f3a-523b-4ba6-82ce-b4f3c37ee218 f3a-523b-4ba6-82ce-b4f3c37ee218 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule LD Street Lighting - District Owned-100 watt sodium vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places where Schedule LC does not apply and is available to cities, counties, lighting districts or other public bodies where the District furnishes, installs, owns, operates and maintains the complete lighting installation. Monthly Usage: 50kWh

63

Data:A060f3e5-53e4-4313-8d71-5d718f3dc6b0 | Open Energy Information  

Open Energy Info (EERE)

f3e5-53e4-4313-8d71-5d718f3dc6b0 f3e5-53e4-4313-8d71-5d718f3dc6b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: GSA(Part 3) Sector: Residential Description: Source or reference: ISU Binder Source Parent: Comments flat rate & fuel adjustment costs change monthly Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

64

Data:Bc3d50ea-f3b1-47d8-90b1-3f3e9e00da9b | Open Energy Information  

Open Energy Info (EERE)

ea-f3b1-47d8-90b1-3f3e9e00da9b ea-f3b1-47d8-90b1-3f3e9e00da9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mountain Lake, Minnesota (Utility Company) Effective date: 2001/01/01 End date if known: Rate name: Residential- Rural Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/193/Mountain%20Lake_0082.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

65

Data:D96a7226-017b-4a7a-95f3-217e12e61c5b | Open Energy Information  

Open Energy Info (EERE)

226-017b-4a7a-95f3-217e12e61c5b 226-017b-4a7a-95f3-217e12e61c5b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: 2012/05/23 End date if known: Rate name: LARGE THREE PHASE GENERAL SERVICE-(most recent & < 50 kW) Sector: Commercial Description: This schedule is available throughout the Cooperative's entire service area subject to the availability limitation and other stipulations that follow, or by contract at the Cooperative's option. This schedule is applicable to single phase consumers requiring greater than 100 kVA of installed transformer capacity and to all three phase consumers. Other service options are available under a special contract schedule. In the event that an extension, expansion, or enlargement of the Cooperative's system facilities is required, the Cooperative, in order to justify the investment and operational costs involved, at its option may require a contribution in aid of construction or a larger monthly service charge depending upon the conditions involved. CHARACTER AND TYPE OF SERVICE: Service rendered under this schedule shall be single phase, 60 hertz, at available secondary 120/240 nominal voltage; or three phase, 60 Hertz, at 120/208 volts or 277/480 volts; or 240 volts or 480 volts or other voltages as may be mutually agreeable.

66

Electrochemical construction  

DOE Patents (OSTI)

An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

Einstein, Harry (Springfield, NJ); Grimes, Patrick G. (Westfield, NJ)

1983-08-23T23:59:59.000Z

67

Data:A915028e-78fd-4dc6-8c89-228bab9da7f3 | Open Energy Information  

Open Energy Info (EERE)

5028e-78fd-4dc6-8c89-228bab9da7f3 5028e-78fd-4dc6-8c89-228bab9da7f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2008/11/01 End date if known: Rate name: NEC` Sector: Description: Availability: This rider is available to any Distributed Generating Facility Class I renewable energy resource or hydropower facility whose generating capacity is less than or equal to 2,000 kilowatts. Monthly Rate: As determined under the applicable tariff but not less than the minimum charge of the applicable rate. Net energy billing shall be performed monthly, and payments for excess sales to the Company shall be made on an annual basis, for the period from April of each year to March of the following year. During an annual period, if energy sold to the Company in any month exceeds energy purchased, the excess sales will first be credited to the customer in the current billing period and any remaining net sales will be carried forward for crediting on a per kWh-basis in the next billing period or a subsequent billing period within the annual net energy period. This procedure will commence with the April billing period and continue monthly through the March billing period. Any excess kWh remaining at the end of an annual period shall be paid at that time according to the following schedule:

68

Data:3a86170c-ccd5-4f17-a4af-7b6f3ef1815f | Open Energy Information  

Open Energy Info (EERE)

70c-ccd5-4f17-a4af-7b6f3ef1815f 70c-ccd5-4f17-a4af-7b6f3ef1815f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: General Service, Poly phase(Option Y) Sector: Commercial Description: Demand Charges - KW billing demand shall be the maximum average kW demand for any period of fifteen consecutive minutes during the billing period. KVar billing demand will be determined by trigonometric calculation using the peak 15-minute kW billing demand and the average power factor for the period. Energy Charge Options - An account will be billed Energy Charges according to its choice of Option Y - Year-round pricing (the default option), Option S - Seasonal pricing, or Option T - Time-of-use pricing. Every twelve months an account is eligible to select a new Energy Charge Option. An account that elects seasonal or time-of-use pricing for the first time may elect a different option upon completion of a six month initial trial period. If a service location has changed hands and been billed under multiple Energy Charge Options during the previous twelve months, REMC reserves the right to require a new account to begin service for the initial twelve months under Option Y - Year-round pricing.

69

Data:603f3abb-4342-429c-978c-0670c88794af | Open Energy Information  

Open Energy Info (EERE)

3f3abb-4342-429c-978c-0670c88794af 3f3abb-4342-429c-978c-0670c88794af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

70

Data:328f5754-e823-4762-9c66-1213f3f10781 | Open Energy Information  

Open Energy Info (EERE)

4-e823-4762-9c66-1213f3f10781 4-e823-4762-9c66-1213f3f10781 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of La Grange, Texas (Utility Company) Effective date: End date if known: Rate name: Schedule SP: Special rates.(hospital X-ray). Sector: Residential Description: Rate SP-2 (hospital X-ray). The rate for SP-2 shall be $30.00. Source or reference: http://z2codes.franklinlegal.net/franklin/Z2Browser2.html?showset=lagrangeset Source Parent: Comments All Rates are subject to Power cost adjustment (PCA) Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

71

Data:Fb2ea69c-8fab-47f3-9541-564915522ac7 | Open Energy Information  

Open Energy Info (EERE)

c-8fab-47f3-9541-564915522ac7 c-8fab-47f3-9541-564915522ac7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: Area Lighting - 250 W High Pressure Sodium- District Owned Sector: Lighting Description: To any customer who contracts for lighting of outdoor areas not provided for by the District's Street Lighting Schedules. Service shall be provided from dusk until dawn or approximately 4,000 hours per annum. The District will own, install on existing structures, and maintain the area lighting equipment. The District will furnish unmetered current on a monthly charge.

72

Data:46d44395-8f3e-494e-9281-2925e378591b | Open Energy Information  

Open Energy Info (EERE)

-8f3e-494e-9281-2925e378591b -8f3e-494e-9281-2925e378591b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Private Area Lighting-Enclosed Bottom-Mercury Vapor-400 W Sector: Lighting Description: Estimated Average Monthly Usage: 155kWh Rates are subject to wholesale power cost adjustments. Terms and Conditions apply. Source or reference: http://www.anec.com/yourbill/rate_pdfs/AST_PL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

73

Data:2341e31a-420c-4941-8341-9f18543942f3 | Open Energy Information  

Open Energy Info (EERE)

1a-420c-4941-8341-9f18543942f3 1a-420c-4941-8341-9f18543942f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Electric Member Corp Effective date: 2010/01/01 End date if known: Rate name: SCHEDULE "LPS-2BD" LARGE POWER SERVICE Sector: Commercial Description: Applicable to all electric service of one standard secondary voltage (per premise) required on the consumer's single or multiple premises, delivered and metered at, or compensated to, that voltage. Service shall be provided through a single meter, where practical, or through a single meter for each premise such that the meters may be totalized to a single billing. Service under this schedule is contingent upon the consumer meeting each of the following requirements:

74

Data:87978379-5878-473a-9e17-aaf0f3c0890f | Open Energy Information  

Open Energy Info (EERE)

8379-5878-473a-9e17-aaf0f3c0890f 8379-5878-473a-9e17-aaf0f3c0890f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Small Power Service - More than 100kW -Primary Metering Discount Sector: Commercial Description: Application: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 100 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

75

Data:4471b83c-f3ab-4488-b486-fb4bbb915272 | Open Energy Information  

Open Energy Info (EERE)

c-f3ab-4488-b486-fb4bbb915272 c-f3ab-4488-b486-fb4bbb915272 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: Cogeneration & Small Power Production Purchase Sector: Commercial Description: To cogeneration and small power production facilities with production capacity of 100 kW and less that qualify under the guidelines for implementing PURPA Sections 201 and 210 as adopted by the LES Administrative Board. ACCOUNTING CHARGE: The owner of the Qualifying Facility will pay to LES the following monthly charges for additional energy accounting expenses incurred by LES: Cogeneration & Small Power Production Accounting Charge kWh Meter $/meter $3.90

76

Data:6dbc85bf-9b94-44c9-aefd-2249703438f3 | Open Energy Information  

Open Energy Info (EERE)

dbc85bf-9b94-44c9-aefd-2249703438f3 dbc85bf-9b94-44c9-aefd-2249703438f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE AG-14 AGRICULTURAL SERVICE MULTI-PHASE Sector: Description: AVAILABILITY Available in all territory served by the Cooperative, in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable to all agricultural services requiring 50 kVA or less of installed transformer capacity for all use to be supplied through one meter. The capacity of individual motors served under this schedule shall not exceed 10 horsepower.

77

Data:7a088ffd-9711-4796-8489-9c9f3eeee907 | Open Energy Information  

Open Energy Info (EERE)

a088ffd-9711-4796-8489-9c9f3eeee907 a088ffd-9711-4796-8489-9c9f3eeee907 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Parker, South Dakota (Utility Company) Effective date: End date if known: Rate name: Industrial Rate Sector: Industrial Description: For customers with demand of 100 kW or higher Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

78

Data:01307ebf-18f3-470b-bf39-ca3949fa6532 | Open Energy Information  

Open Energy Info (EERE)

ebf-18f3-470b-bf39-ca3949fa6532 ebf-18f3-470b-bf39-ca3949fa6532 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Seasonal Service/Demand Sector: Commercial Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

79

Data:73264511-18c3-4579-a03b-538f3fb74535 | Open Energy Information  

Open Energy Info (EERE)

-18c3-4579-a03b-538f3fb74535 -18c3-4579-a03b-538f3fb74535 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delta Electric Power Assn Effective date: 2008/07/01 End date if known: Rate name: 22 High Pressure Sodium Yardlight Sector: Lighting Description: Available to consumers for overhead lighting service from lighting equipment provided by the Association, subject to the established rules and regulations of the Association. Installation, operation, and maintenance of a 100 watt high pressure sodium lighting unit by the Association on a a suitable pole at a location agreeable both to the consumer and the Association.

80

Wisconsin No 2 Diesel Off-Highway Construction (Thousand Gallons)  

U.S. Energy Information Administration (EIA)

Wisconsin No 2 Diesel Off-Highway Construction (Thousand Gallons) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 16,323: 12,292 ...

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

82

Remaining Sites Verification Package for the 1607-F3 Sanitary Sewer System, Waste Site Reclassification Form 2006-047  

Science Conference Proceedings (OSTI)

The 1607-F3 waste site is the former location of the sanitary sewer system that supported the 182-F Pump Station, the 183-F Water Treatment Plant, and the 151-F Substation. The sanitary sewer system included a septic tank, drain field, and associated pipeline, all in use between 1944 and 1965. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2007-04-26T23:59:59.000Z

83

Data:014fdde3-8318-4761-b5f3-cee450e83c44 | Open Energy Information  

Open Energy Info (EERE)

fdde3-8318-4761-b5f3-cee450e83c44 fdde3-8318-4761-b5f3-cee450e83c44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Pgs-2 Customer-Owner Generation systems(Greater than 20kW) Sector: Residential Description: Available for Single-phase and three phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of greater than 20 kW and less than or equal to 100 kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

84

Data:4decccb6-6121-4a40-8ccf-47f3fdd68532 | Open Energy Information  

Open Energy Info (EERE)

decccb6-6121-4a40-8ccf-47f3fdd68532 decccb6-6121-4a40-8ccf-47f3fdd68532 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Upper Peninsula Power Co Effective date: 2013/07/01 End date if known: Rate name: Light and Power Service P-1 Sector: Commercial Description: Any customer for light and power purposes with a billing demand equal to or greater than 25 kW but less than 200 kW. To qualify, the customer must maintain a demand equal to or greater than 25 kW for three consecutive months and at least once in each succeeding twelvemonth period. Optional Power Supply Service is available only to Customers not taking power supply service under rate schedule RAST, or not required to receive service under rate schedule PSDS. This rate is subject to the Company's Power Supply Cost Recovery shown on Sheet No. D-3.00. This rate is subject to the Energy Optimization Surcharge shown on Sheet No. D-73.00.

85

Data:79508970-6157-4b06-8590-f3b10925e52b | Open Energy Information  

Open Energy Info (EERE)

0-6157-4b06-8590-f3b10925e52b 0-6157-4b06-8590-f3b10925e52b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Three Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

86

Data:41269e7e-fbfc-43f6-8786-89e7819697f3 | Open Energy Information  

Open Energy Info (EERE)

e7e-fbfc-43f6-8786-89e7819697f3 e7e-fbfc-43f6-8786-89e7819697f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule LGH-Large Standard General Service:shoreline(Aurora 1 Undergrounding Charge with Transformer Investment Discount) Sector: Industrial Description: SCHEDULE LGH is for standard general service provided to City of Shoreline customers whose maximum monthly demand is equal to or greater than 1,000 kW but less than 10,000 kW. Discounts: Transformer losses - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh Transformer investment - $0.26 per kW of monthly maximum demand Minimum Charge: $34.21 per meter per day

87

Data:5ea371f2-7571-40f3-94ea-dd3497056727 | Open Energy Information  

Open Energy Info (EERE)

71f2-7571-40f3-94ea-dd3497056727 71f2-7571-40f3-94ea-dd3497056727 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mountain Lake, Minnesota (Utility Company) Effective date: 2001/01/01 End date if known: Rate name: Industrial Sector: Industrial Description: Tiered Demand Charges: First 60kW: $369.00/mo. Excess 60kW: $4.65/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/193/Mountain%20Lake_0082.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

88

Data:85505044-4615-4682-86f3-1a6b1af6991b | Open Energy Information  

Open Energy Info (EERE)

-4615-4682-86f3-1a6b1af6991b -4615-4682-86f3-1a6b1af6991b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

89

Data:605b35f3-580b-4327-82c1-626021364bbf | Open Energy Information  

Open Energy Info (EERE)

b35f3-580b-4327-82c1-626021364bbf b35f3-580b-4327-82c1-626021364bbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co (South Dakota) Effective date: End date if known: Rate name: GS-TOU (General Service Time-Of-Use) Sector: Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. T T APPLICATION OF SCHEDULE: This schedule is applicable to nonresidential Customers with one Meter providing electrical service. MANDATORY AND VOLUNTARY RIDERS: The amount of a bill for service will be modified by any Mandatory Rate Riders that must apply and by any Voluntary Rate Riders selected by the Customer, unless otherwise noted in this schedule. See Sections 12.00, 13.00 and 14.00 of the South Dakota electric rates for the matrices of riders.

90

Construction proprietary  

E-Print Network (OSTI)

2. Construction a. The composite mirrors The mirror was made of a graphite #12;ber backing, coated An aerogel radiator can in principle pro- vide hadron separation throughout the full momentum range. However proton aerogel gas GeV mrad 0 50 100 150 200 250 2 4 6 8 10 12 14 track parameters Direct Ray Tracing

91

Pages that link to "Data:41269e7e-fbfc-43f6-8786-89e7819697f3...  

Open Energy Info (EERE)

f6-8786-89e7819697f3: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Seattle, Washington (Utility Company) ( links) View (previous 50 | next 50) (20 | 50 |...

92

Data:642f819f-8c40-41a5-9fe0-20f3ea432438 | Open Energy Information  

Open Energy Info (EERE)

19f-8c40-41a5-9fe0-20f3ea432438 19f-8c40-41a5-9fe0-20f3ea432438 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Chelan County Effective date: 2012/01/01 End date if known: Rate name: IRRIGATION SERVICE Three Phase Sector: Commercial Description: Schedule 5 AVAILABILITY: This schedule applies to seasonal irrigation pumping power during the months of May through September of each year. After the September billing, any incidental use in any single permanent pumping installation, including lighting essential to the pumping operation will be billed on the first irrigation bill of the following season. For such lighting service, the customer will furnish the transformer and other necessary equipment. CHARACTER OF SERVICE: Service to be furnished under this schedule may be either single phase, three phase or four wire three phase, 60-cycle alternating current at available phase and voltage. METERING: In order to obtain service under this schedule, the irrigation pumping customer must provide proper service entrance facilities permitting the installation of metering equipment to record the energy used. DETERMINATION OF LOAD: 1. Demand Charges and Basic Charge on single motor pumping installations and multiple motor pumping installations of a total of 10 hp or less shall be based on not less than the rated nameplate capacity of the motor(s). 2. Demand Charges and Basic Charge on multiple motor pumping installations with a total namepleate capacity of 10 hp or greater shall be by demand meter. 3. Installations of less than 1 hp will be billed as 1 hp installations. 4. The KW demand read obtained from the demand meter will be multiplied by a factor of 1.34 to show the peak horsepower capacity used during the billing period.

93

Exhibit F-3  

U.S. Energy Information Administration (EIA) Indexed Site

on All Night Outdoor Lights with a Timer, Motion Sensor, or Photosensor Outdoor Gas Light High Intensity Discharge (HID) Outdoor Lights (Such as metal halide or high pressure...

94

Exhibit F-3  

U.S. Energy Information Administration (EIA) Indexed Site

for Counting Lights Count any and all lights in home A light is defined as every light bulb turned on by a single light switch. A fixture or lamp with two switches is counted...

95

Data:A8b1d713-96ee-4ae8-825f-3f1a2d0dc176 | Open Energy Information  

Open Energy Info (EERE)

b1d713-96ee-4ae8-825f-3f1a2d0dc176 b1d713-96ee-4ae8-825f-3f1a2d0dc176 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: El Paso Electric Co Effective date: 2010/07/01 End date if known: Rate name: Cotton gin service Transmission voltage Sector: Commercial Description: this rate is available to cotton gins for purchase of their entire power requirements from the Company and is applicable to electric service other than separately metered light and miscellaneous office electric load furnished to the cotton gin. The separately metered lighting and miscellaneous office electric load will be billed under the applicable rate schedule. Customer's operating season will start September 1st of each year or such later date as the customer first takes service. The above season shall not be for a period of less than three month, and the season shall not last longer than eight month or April 30th of the following year, whichever comes first. Electrical usage occurring other than during the regular operating season will be billed on the applicable rate schedule.

96

PUMP CONSTRUCTION  

DOE Patents (OSTI)

A pump which utilizes the fluid being pumped through it as its lubricating fluid is described. This is achieved by means of an improved bearing construction in a pump of the enclosed or canned rotor type. At the outlet end of the pump, adjacent to an impeller mechanism, there is a bypass which conveys some of the pumped fluid to a chamber at the inlet end of the pump. After this chamber becomes full, the pumped fluid passes through fixed orifices in the top of the chamber and exerts a thrust on the inlet end of the pump rotor. Lubrication of the rotor shaft is accomplished by passing the pumped fluid through a bypass at the outlet end of the rotor shaft. This bypass conveys Pumped fluid to a cooling means and then to grooves on the surface of the rotor shait, thus lubricating the shaft.

Strickland, G.; Horn, F.L.; White, H.T.

1960-09-27T23:59:59.000Z

97

Data:7e7e7e47-3f17-4bda-bca3-5297f3d4fd6e | Open Energy Information  

Open Energy Info (EERE)

e7e47-3f17-4bda-bca3-5297f3d4fd6e e7e47-3f17-4bda-bca3-5297f3d4fd6e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Jasper, Indiana (Utility Company) Effective date: 2009/09/01 End date if known: Rate name: Security Lighting (1000 W HPS) Sector: Lighting Description: Applicable only for continuous year-round outdoor lighting service. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

98

Construction Safety Forecast for ITER  

SciTech Connect

The International Thermonuclear Experimental Reactor (ITER) project is poised to begin its construction activity. This paper gives an estimate of construction safety as if the experiment was being built in the United States. This estimate of construction injuries and potential fatalities serves as a useful forecast of what can be expected for construction of such a major facility in any country. These data should be considered by the ITER International Team as it plans for safety during the construction phase. Based on average U.S. construction rates, ITER may expect a lost workday case rate of < 4.0 and a fatality count of 0.5 to 0.9 persons per year.

cadwallader, lee charles

2006-11-01T23:59:59.000Z

99

Data:95c431f6-9f3f-43d5-884b-c60f0b1242e7 | Open Energy Information  

Open Energy Info (EERE)

31f6-9f3f-43d5-884b-c60f0b1242e7 31f6-9f3f-43d5-884b-c60f0b1242e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coahoma Electric Power Assn Effective date: 2009/01/31 End date if known: Rate name: 12 - General Service Single Phase Sector: Description: Available to all consumers within the allocated service areas and subject to the established rules and regulations of the Association. Single phase, 60 cycle, at available secondary voltages. Motors having a rate capacity in excess of 10 HP must be three-phase. Applicable to all clubhouses and small churches. Also applicable to small general services requiring less than 50 kVA of transformer capacity including but not limited to farm shops, farm offices, water pumps, fuel & chemical pumps, feed lots and barns, civic clubs or community centers, hobby, storage, or utility buildings, street and railroad signal lights, sign lighting, hunting lodges,& recreational services, temporary construction service, meter without structure, grocery stores, beauty shops, laundries, government buildings, factories and plants, airport buildings and lighting, sewage treatment facilities, grain elevators and see processors, commercial office buildings, lounges or night clubs, telephone microwave tower, pipeline rectifier station, telephone amplifier station, TV cable tower, and other miscellaneous services. Service is for the exclusive use of the consumer and shall not be resold or shared with others.

100

Data:45c5dde9-a869-46f3-a67b-9bdfdf45a94c | Open Energy Information  

Open Energy Info (EERE)

c5dde9-a869-46f3-a67b-9bdfdf45a94c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading......

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:E012d411-d9dd-4ba8-a2a8-ed2575f3bd28 | Open Energy Information  

Open Energy Info (EERE)

1-d9dd-4ba8-a2a8-ed2575f3bd28 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1....

102

Utility Residential New Construction Programs: Going Beyond the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Utility Residential New Construction Programs: Going Beyond the Code Title Utility Residential New Construction Programs: Going Beyond the Code Publication Type Report Year of...

103

Data:Dc152314-1a17-46e1-8abc-339f3a3e1522 | Open Energy Information  

Open Energy Info (EERE)

52314-1a17-46e1-8abc-339f3a3e1522 52314-1a17-46e1-8abc-339f3a3e1522 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(35 W Entrance Lights) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

104

Data:435de91b-83f3-414b-a825-39937644f43e | Open Energy Information  

Open Energy Info (EERE)

de91b-83f3-414b-a825-39937644f43e de91b-83f3-414b-a825-39937644f43e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: End date if known: Rate name: LARGE PRIMARY SERVICE SPECIAL CONTRACT - INDUSTRIAL RIDER TOU Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

105

Data:Ca474bbb-84b7-420d-9510-93db115f3fe8 | Open Energy Information  

Open Energy Info (EERE)

Ca474bbb-84b7-420d-9510-93db115f3fe8 Ca474bbb-84b7-420d-9510-93db115f3fe8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: General Service Schedule - GS Rate 22 Sector: Commercial Description: The minimum monthly charge shall be the greater of: *The Basic Facility Charge. *The monthly minimum charge as established in the Agreement For Electric Service (contract) between the Cooperative and the consumer. $30.00 Source or reference: http://www.tcec.com/myBusiness/generalServiceScheduleRate22.aspx Source Parent: http://www.tcec.com

106

Data:B9130ca4-188b-4d87-9f3f-1609711a9898 | Open Energy Information  

Open Energy Info (EERE)

88b-4d87-9f3f-1609711a9898 88b-4d87-9f3f-1609711a9898 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2011/11/01 End date if known: Rate name: LMS- Schedule GSD-5 Sector: Commercial Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

107

Data:Ba1305c9-c23a-4806-bd59-37aeb08f3bb8 | Open Energy Information  

Open Energy Info (EERE)

Ba1305c9-c23a-4806-bd59-37aeb08f3bb8 Ba1305c9-c23a-4806-bd59-37aeb08f3bb8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: General Service-GS 3 Single-Phase-Prmary Discount Sector: Commercial Description: *Applicable for service less than 12,000kw. Subject to tax and power cost adjustment. Source or reference: http://www.trico.coop/images/TRICO_GS3.pdf Source Parent: Comments Energy charge is the sum of power supply charge and access charge. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

108

Data:90ca2b31-b701-499c-88f3-0b2484b4300d | Open Energy Information  

Open Energy Info (EERE)

b31-b701-499c-88f3-0b2484b4300d b31-b701-499c-88f3-0b2484b4300d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting PTEMINU 9500 Sector: Commercial Description: Source or reference: http://www.loup.com/docs/customersvc/LLS-Rates2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

109

Data:4fa49e45-f0f3-4bb4-8987-1a707fe64b51 | Open Energy Information  

Open Energy Info (EERE)

5-f0f3-4bb4-8987-1a707fe64b51 5-f0f3-4bb4-8987-1a707fe64b51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nemaha-Marshall E C A, Inc Effective date: 2007/05/15 End date if known: Rate name: Private Street and Area Lighting (PSL-06) (250 W Metered Mercury Vapor) Sector: Lighting Description: Outdoor Lighting service to individual consumers. 100 W Metered Mercury Vapor. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

110

Data:5b9d00ff-75b8-49f3-9fab-15c95f225768 | Open Energy Information  

Open Energy Info (EERE)

d00ff-75b8-49f3-9fab-15c95f225768 d00ff-75b8-49f3-9fab-15c95f225768 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp (Idaho) Effective date: 2012/10/01 End date if known: Rate name: GS - Schedule 11 Sector: Commercial Description: AILABLE: To Customers in the State of Idaho where Company has electric service available. APPLICABLE: To general service supplied for all power requirements when all such service taken on the premises is supplied through one meter installation. Source or reference: http://www.puc.state.id.us/tariff/approved/Electric/AvistaElectric.pdf Source Parent: Comments

111

Data:D38eee9d-f3ae-413b-8926-91cf50b8b20b | Open Energy Information  

Open Energy Info (EERE)

d-f3ae-413b-8926-91cf50b8b20b d-f3ae-413b-8926-91cf50b8b20b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Landis, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Residential All Electric Senior Citizens Service Sector: Residential Description: A tax of $.003379 is included in this rate Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

112

Data:5f347c14-5ab9-40f3-9996-451bf6528fa7 | Open Energy Information  

Open Energy Info (EERE)

-5ab9-40f3-9996-451bf6528fa7 -5ab9-40f3-9996-451bf6528fa7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - MV-L 7000L Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

113

Data:757b78c3-7b01-44f3-8e27-bba47b686673 | Open Energy Information  

Open Energy Info (EERE)

8c3-7b01-44f3-8e27-bba47b686673 8c3-7b01-44f3-8e27-bba47b686673 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2011/07/08 End date if known: Rate name: OUTDOOR LIGHTING "OL" High Pressure Sodium 70W Sector: Lighting Description: there are many different classifications for different structures for lights. The monthly charge here is for the existing pole. Click on the link for other structures. Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

114

Data:Da62a5cc-26a9-4f79-ae72-1f3fda749409 | Open Energy Information  

Open Energy Info (EERE)

cc-26a9-4f79-ae72-1f3fda749409 cc-26a9-4f79-ae72-1f3fda749409 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Georgetown, Texas (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Retail Street Lighting Service, 250 watts Sector: Lighting Description: 250 watts lamp(86 kWh) Source or reference: http://billing.georgetown.org/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

115

Data:998a6b93-6a40-4406-b626-f3af149dc8fb | Open Energy Information  

Open Energy Info (EERE)

b93-6a40-4406-b626-f3af149dc8fb b93-6a40-4406-b626-f3af149dc8fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Schedule B- Rate 0003 (Single-Phase) Sector: Commercial Description: This rate is available to members for commercial, industrial and three-phase farm service for all uses, including lighting, heating etc.., subject to established rules of the cooperative. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

116

Data:Fada7d63-0289-4eec-b95e-6b977f3cab09 | Open Energy Information  

Open Energy Info (EERE)

Fada7d63-0289-4eec-b95e-6b977f3cab09 Fada7d63-0289-4eec-b95e-6b977f3cab09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (55 W LED HE with Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

117

Data:0b8f2191-1e00-47df-aaaa-7706f3c8d09d | Open Energy Information  

Open Energy Info (EERE)

1e00-47df-aaaa-7706f3c8d09d 1e00-47df-aaaa-7706f3c8d09d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate OL - Outdoor Lighting Service - MV 400 Watts - Flood Sector: Lighting Description: Applicable for outdoor lighting services on private property with Company owned fixtures in the Company's entire service area where secondary distribution lines are adjacent to the premises to be served. Not applicable for lighting public roadways which are dedicated, or anticipated to be dedicated, except to meet the occasional singular need of a customer who has obtained written approval from the proper governmental authority.

118

Data:Cd29cf69-530d-49f3-b854-086c83b93d8b | Open Energy Information  

Open Energy Info (EERE)

cf69-530d-49f3-b854-086c83b93d8b cf69-530d-49f3-b854-086c83b93d8b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2010/11/16 End date if known: Rate name: Street Lights- 150W High Pressure Sodium- Fiberglass Pole Sector: Lighting Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

119

Data:E0ff15bf-f2f3-46b3-bf41-8efba25fe598 | Open Energy Information  

Open Energy Info (EERE)

ff15bf-f2f3-46b3-bf41-8efba25fe598 ff15bf-f2f3-46b3-bf41-8efba25fe598 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Directional Lighting MH 400 W Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

120

Data:5fc0f9f3-190b-422f-b754-03bc08d279f7 | Open Energy Information  

Open Energy Info (EERE)

fc0f9f3-190b-422f-b754-03bc08d279f7 fc0f9f3-190b-422f-b754-03bc08d279f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Area Lighting HPS 250 Watt Unmetered Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:Ccbe5417-d7ff-44c8-ad25-8a73f3c00c3e | Open Energy Information  

Open Energy Info (EERE)

Ccbe5417-d7ff-44c8-ad25-8a73f3c00c3e Ccbe5417-d7ff-44c8-ad25-8a73f3c00c3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 100 watt HPS Ornamental Fixture w/Pole Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments

122

Data:9590f1f3-b174-4211-b576-833affd7b92a | Open Energy Information  

Open Energy Info (EERE)

f3-b174-4211-b576-833affd7b92a f3-b174-4211-b576-833affd7b92a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Moon Lake Electric Assn Inc (Utah) Effective date: 2000/07/01 End date if known: Rate name: Street Lighting-High Pressure Sodium-CONSUMER-OWNED SYSTEM 250W Sector: Lighting Description: All standards, brackets, foundations, lighting units and glassware shall be at the expense of the city or property owner. Maintenance, lamp and glass renewals shall be negotiated with the Association. Source or reference: http://www.mleainc.com/pdf/rates/rate_sch_sl.pdf Source Parent: Comments Applicability

123

Data:85b3823e-9637-4eef-9ea2-ea00eb83f3f2 | Open Energy Information  

Open Energy Info (EERE)

23e-9637-4eef-9ea2-ea00eb83f3f2 23e-9637-4eef-9ea2-ea00eb83f3f2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule CSI-1-H Sector: Commercial Description: Source or reference: http://199.44.84.82/files/CSI-1-H.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

124

Data:1168e29b-5be5-4863-82c9-998fc5958f3b | Open Energy Information  

Open Energy Info (EERE)

b-5be5-4863-82c9-998fc5958f3b b-5be5-4863-82c9-998fc5958f3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (175W MV on existing DPUA utility Pole) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

125

Data:76e14b80-f3e0-46c3-8c06-9c8035044339 | Open Energy Information  

Open Energy Info (EERE)

b80-f3e0-46c3-8c06-9c8035044339 b80-f3e0-46c3-8c06-9c8035044339 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: El Paso Electric Co Effective date: 2012/05/01 End date if known: Rate name: GENERAL SERVICE RATE (SECONDARY VOLTAGE) Sector: Commercial Description: This rate is available to all customers for lighting, power, and heating service with a highest measured demand as defined by the Determination of Billing Demand. Service under this rate shall be limited to customers who otherwise do not qualify for service under the Company's other rates and whose highest measured demand, during the current

126

Data:4c206a3a-6876-4734-9f96-3949926eb5f3 | Open Energy Information  

Open Energy Info (EERE)

876-4734-9f96-3949926eb5f3 876-4734-9f96-3949926eb5f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: J-4 (Customer-Owned Street Lighting Service) 70 Watt High Pressure Sodium Sector: Lighting Description: To governmental agency, lighting district, and water district-owned daily, dusk-to-dawn lighting systems which illuminate streets, alleys, and thoroughfares used primarily for motorized vehicular traffic and which meet EWEB's specifications. Source or reference: http://www.eweb.org/public/documents/policies/electric5.pdf

127

Data:D5b141ec-ce49-437a-9a01-1888aca9f3c5 | Open Energy Information  

Open Energy Info (EERE)

1ec-ce49-437a-9a01-1888aca9f3c5 1ec-ce49-437a-9a01-1888aca9f3c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Large Power Service Sector: Industrial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

128

Data:411ab91d-9aee-4ea6-bd00-7bed50f3eb79 | Open Energy Information  

Open Energy Info (EERE)

1d-9aee-4ea6-bd00-7bed50f3eb79 1d-9aee-4ea6-bd00-7bed50f3eb79 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate N724 - In Town Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

129

Data:Ea3e9c11-7657-41c0-9e39-230940d4e8f3 | Open Energy Information  

Open Energy Info (EERE)

c11-7657-41c0-9e39-230940d4e8f3 c11-7657-41c0-9e39-230940d4e8f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Coop Owns/Repairs HPS 70 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

130

Data:6388ce77-ba0d-4c9e-83c4-cc907eaf84f3 | Open Energy Information  

Open Energy Info (EERE)

7-ba0d-4c9e-83c4-cc907eaf84f3 7-ba0d-4c9e-83c4-cc907eaf84f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipton Municipal Electric Util Effective date: 2004/08/13 End date if known: Rate name: Rate F- Street and Highway Lighting: Overhead, 150 Watt Sodium Vapor Sector: Lighting Description: Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

131

Data:23ecbc96-33f3-46d4-9c6f-118429985907 | Open Energy Information  

Open Energy Info (EERE)

ecbc96-33f3-46d4-9c6f-118429985907 ecbc96-33f3-46d4-9c6f-118429985907 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: 2013/06/01 End date if known: Rate name: GSA-Part 1 Sector: Commercial Description: Source or reference: http://www.tcemc.org/index.php/business-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

132

Data:Ffb82a22-f3f2-4758-8158-17dbbbb23fc5 | Open Energy Information  

Open Energy Info (EERE)

Ffb82a22-f3f2-4758-8158-17dbbbb23fc5 Ffb82a22-f3f2-4758-8158-17dbbbb23fc5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Light Emitting Diode Post Top with Ribs 100 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

133

Data:0e416265-4915-43c2-bebd-c020468b5f3b | Open Energy Information  

Open Energy Info (EERE)

5-4915-43c2-bebd-c020468b5f3b 5-4915-43c2-bebd-c020468b5f3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Cobrahead- HPS 150 Watt Gray Sector: Lighting Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

134

Data:Eba222af-34f3-4be9-b56c-0232f6ac19fd | Open Energy Information  

Open Energy Info (EERE)

af-34f3-4be9-b56c-0232f6ac19fd af-34f3-4be9-b56c-0232f6ac19fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Calhoun, Georgia (Utility Company) Effective date: 2006/07/01 End date if known: Rate name: Medium Power Service- Industrial Sector: Industrial Description: This rate is applicable to all commercial or industrial electric service which is delivered or compensated to one standard voltage . Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

135

Data:870f765a-491d-4c34-a480-f3ef993be18b | Open Energy Information  

Open Energy Info (EERE)

65a-491d-4c34-a480-f3ef993be18b 65a-491d-4c34-a480-f3ef993be18b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/12/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 100 watt High Pressure Sodium or Metal Halide Sector: Lighting Description: Availability A member must be receiving electric service to be eligible for a security light at that location. Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup.

136

Data:A3b957b2-da1b-4a2e-a610-c5677f3e7595 | Open Energy Information  

Open Energy Info (EERE)

da1b-4a2e-a610-c5677f3e7595 da1b-4a2e-a610-c5677f3e7595 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Institutional service Sector: Residential Description: This rate schedule is for three-phase service for a load in excess of 50 KW serving an institution of public, charitable or educational character, excluding industrial and commercial. Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments minimum charge of $330.89

137

Data:80f439f3-644e-4454-964f-a54c52219677 | Open Energy Information  

Open Energy Info (EERE)

f3-644e-4454-964f-a54c52219677 f3-644e-4454-964f-a54c52219677 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/15 End date if known: Rate name: Highway Lighting Mercury Vapor 250 Watt (Wood) Sector: Lighting Description: Available to public authorities, other than municipalities, for public high way and roadway lighting in the retail distribution service territory of the District. Source or reference: www.nppd.com/my-account/rates-2/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

138

Data:7b55475f-65f3-4dbc-a238-2494850b7cf4 | Open Energy Information  

Open Energy Info (EERE)

65f3-4dbc-a238-2494850b7cf4 65f3-4dbc-a238-2494850b7cf4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule B-2 ( Large Industrial Rate) Sector: Industrial Description: Applicable to contracts with demands of 4,000 KW and greater with a monthly energy usage equal to or greater than 425 hours per KW of contract demand. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf

139

Data:A3864f3e-0586-49a3-a0e9-f8a76a559035 | Open Energy Information  

Open Energy Info (EERE)

64f3e-0586-49a3-a0e9-f8a76a559035 64f3e-0586-49a3-a0e9-f8a76a559035 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 100 W High Pressure Sodium- Nonwood Sector: Lighting Description: To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Nonwood; Open Refractor Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

140

Data:D21cd3bf-fb82-45f3-89c6-83790d1a95fb | Open Energy Information  

Open Energy Info (EERE)

cd3bf-fb82-45f3-89c6-83790d1a95fb cd3bf-fb82-45f3-89c6-83790d1a95fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Commercial General Service Primary Metering Sector: Commercial Description: *Applicable to any non-residential customer, and for master-metered commercial customers providing service to residential type customers for lighting, heating, and power purposes where the customer's electric demand does not exceed 100 kW for three consecutive months. Subject to production cost adjustment and power factor adjustment.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:C7f5ff12-ba8f-41f6-9962-8958e594c5f3 | Open Energy Information  

Open Energy Info (EERE)

f5ff12-ba8f-41f6-9962-8958e594c5f3 f5ff12-ba8f-41f6-9962-8958e594c5f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: Large Power ,Commercial Secondary Service Sector: Commercial Description: * Available to Commercial or industrial service over 25kw. Minimum:Higher of 25kw or 90% of previous June-September demand. All bills are adjusted by applicable taxes. Summer rates cover May- October and Winter cover November- April. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments

142

Data:93ebcf98-92fd-4f8c-899f-3a3f09f63f7e | Open Energy Information  

Open Energy Info (EERE)

ebcf98-92fd-4f8c-899f-3a3f09f63f7e ebcf98-92fd-4f8c-899f-3a3f09f63f7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Ludlow, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 05 Off Peak Water Heating Sector: Residential Description: Service will be supplied under this rate only during such hours as the Department may determine from time to time to meet conditions affecting the spare capacity available for this service, but in any event not less than thirteen hours daily. New applications for this rate have been discontinued. Source or reference: ISU Documentation DOE Sharepoint

143

Data:Dfe9a6f3-edd9-4ab4-af25-268e6da647a2 | Open Energy Information  

Open Energy Info (EERE)

Dfe9a6f3-edd9-4ab4-af25-268e6da647a2 Dfe9a6f3-edd9-4ab4-af25-268e6da647a2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 400W High Pressure Sodium- Urban, Existing Pole Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

144

Data:75d18a59-ab26-40c4-b30f-35f3ef3c6560 | Open Energy Information  

Open Energy Info (EERE)

a59-ab26-40c4-b30f-35f3ef3c6560 a59-ab26-40c4-b30f-35f3ef3c6560 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Benton, Kentucky (Utility Company) Effective date: 2012/05/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/201/Benton_0060.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

145

Data:1fba13a0-f3f1-4616-977e-a004108254a8 | Open Energy Information  

Open Energy Info (EERE)

3a0-f3f1-4616-977e-a004108254a8 3a0-f3f1-4616-977e-a004108254a8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dalton Utilities Effective date: 2011/01/01 End date if known: Rate name: Industrial Multiple Use Sector: Industrial Description: Available throughout the service area from existing lines of adequate capacity as determined by the Board. For all approved uses of an Industrial and Commercial Customers in a separately metered unit as determined by the Board. Source or reference: Rate Binder Kelly 2 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

146

Data:7e26dcdf-b1f3-4062-8971-58a620e247e1 | Open Energy Information  

Open Energy Info (EERE)

dcdf-b1f3-4062-8971-58a620e247e1 dcdf-b1f3-4062-8971-58a620e247e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE G-1 THREE PHASE (SMALL GENERAL SERVICE) Sector: Commercial Description: Customer's maximum metered demand is less than 20.0 k W. Source or reference: http://www.concordma.gov/pages/ConcordMA_LightPlant/CMLP_new_rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

147

Data:2376aa88-4eeb-4596-8a7d-f3e4535e219f | Open Energy Information  

Open Energy Info (EERE)

8-4eeb-4596-8a7d-f3e4535e219f 8-4eeb-4596-8a7d-f3e4535e219f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING, Wood Pole (kWh - 5, Consumers Per Light - 8) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

148

Data:D5636ba9-888d-4fe1-b726-be0d3f3bd2e8 | Open Energy Information  

Open Energy Info (EERE)

36ba9-888d-4fe1-b726-be0d3f3bd2e8 36ba9-888d-4fe1-b726-be0d3f3bd2e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of High Point, North Carolina (Utility Company) Effective date: 2012/07/06 End date if known: Rate name: Residential with Water Heating- Energy Conservation Sector: Residential Description: Available only to residential customers in residences, condominiums, mobile homes, or individually metered apartments, which provide independent and permanent facilities, complete for living, sleeping, eating, cooking, and sanitation. Source or reference: http://www.highpointnc.gov/custsrv/Residential.pdf

149

Data:66b4b0c5-b702-4324-b24f-06c896f3a11c | Open Energy Information  

Open Energy Info (EERE)

c5-b702-4324-b24f-06c896f3a11c c5-b702-4324-b24f-06c896f3a11c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Customer Area Lighting Service- Rate 7: Mercury Vapor, 6,400 Lumen, 175 Watt Sector: Lighting Description: Note: pole rental add $1.00 per month Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

150

Data:C59bf658-ac51-4245-962f-3e58bdf5cd27 | Open Energy Information  

Open Energy Info (EERE)

8-ac51-4245-962f-3e58bdf5cd27 8-ac51-4245-962f-3e58bdf5cd27 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: Green Power Wind Sector: Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments $1/75 per 100 hwr converted to $0.0175 per kwh; ie Green Power is sold in blocks of 100kwh. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

151

Data:Cd0e08f3-2fb2-41b3-b757-1686df5354c9 | Open Energy Information  

Open Energy Info (EERE)

f3-2fb2-41b3-b757-1686df5354c9 f3-2fb2-41b3-b757-1686df5354c9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Large Power 6 Sector: Commercial Description: * Available only to Tyson Processing,Broken Bow,Oklahama with installed capacity of 5,000kW.This rate will not be available for service as standby or auxiliary. Subject to only power factor adjustment and Gross Receipt tax. Source or reference: Rate binder # 4 Source Parent: Comments fixed monthly charge per metering point Applicability Demand (kW) Minimum (kW):

152

Data:2d8ba163-bcc6-48fe-959f-3e119b3e1b24 | Open Energy Information  

Open Energy Info (EERE)

ba163-bcc6-48fe-959f-3e119b3e1b24 ba163-bcc6-48fe-959f-3e119b3e1b24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E1 - 158 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

153

Data:A5855e31-cf17-44c3-98f3-2005aa737985 | Open Energy Information  

Open Energy Info (EERE)

cf17-44c3-98f3-2005aa737985 cf17-44c3-98f3-2005aa737985 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Small Commercial Three- Phase Service Sector: Commercial Description: The minimum monthly charge shall be the greater of: 1. The base charge plus $1.00 per kVA of installed transformer capacity in excess of 25 kVA; or 2. The minimum monthly charge as stated in the Contract for Electric Service. Source or reference: http://www.sawnee.com/Rate%20Pdfs/SC.pdf Source Parent: Comments Applicability

154

Data:696fdf88-ebdf-471f-9fcc-e4a865f3b438 | Open Energy Information  

Open Energy Info (EERE)

fdf88-ebdf-471f-9fcc-e4a865f3b438 fdf88-ebdf-471f-9fcc-e4a865f3b438 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: UNMETERED SECURITY LIGHTING: 175W MV Sector: Lighting Description: AVAILABILITY This schedule is available for unmetered outdoor lighting service to any Customer. Unmetered security lighting shall only be available in locations or installations where, by determination of the Cooperative, it is not feasible and/or practical to install metered security lighting. New or replacement light installations shall be limited to high pressure sodium lights.

155

Data:Ab7e8c9a-82e1-4568-a927-887123beb3f3 | Open Energy Information  

Open Energy Info (EERE)

c9a-82e1-4568-a927-887123beb3f3 c9a-82e1-4568-a927-887123beb3f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hull Municipal Light Plant Effective date: 2009/09/01 End date if known: Rate name: Small Power Rate 34 Sector: Commercial Description: Source or reference: http://www.town.hull.ma.us/Public_Documents/HullMA_Light/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

156

Data:A1d849db-24ad-4e55-82f3-4f26d1a615bf | Open Energy Information  

Open Energy Info (EERE)

9db-24ad-4e55-82f3-4f26d1a615bf 9db-24ad-4e55-82f3-4f26d1a615bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: Irrigation and Soil Drainage Pumping, Three-Phase Sector: Commercial Description: * Applicable to customers who require three-phase seasonal service for irrigation and soil drainage pumping installations. Minimum seasonal charge is $100.00. Source or reference: Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

157

Data:C9771caa-2916-49d3-a56e-0e12f3d403df | Open Energy Information  

Open Energy Info (EERE)

caa-2916-49d3-a56e-0e12f3d403df caa-2916-49d3-a56e-0e12f3d403df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 150 W MH Opt. 1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

158

Data:59082e36-0f3c-4080-9fe0-f05db2cb814d | Open Energy Information  

Open Energy Info (EERE)

-0f3c-4080-9fe0-f05db2cb814d -0f3c-4080-9fe0-f05db2cb814d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Outdoor Recreational Lighting Rate Sector: Lighting Description: Availability: Applies for service in the new service territory acquired from Delmarva Power and Light Co. by the Cooperative and is available to non-profit organizations and local governmental entities where at least 90% of the total connected load is used for outdoor recreational lighting. Rates are subject to wholesale power cost adjustments.

159

Data:4495cdd4-36d0-449c-b85b-d0fc57fd7f3e | Open Energy Information  

Open Energy Info (EERE)

cdd4-36d0-449c-b85b-d0fc57fd7f3e cdd4-36d0-449c-b85b-d0fc57fd7f3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: OL - 100 watt HPS Sector: Lighting Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for outdoor lighting to any Customer including Community Organizations or Real Estate Developers.

160

Data:A1f3bd89-07d5-4fa7-a2bb-11800ed34869 | Open Energy Information  

Open Energy Info (EERE)

f3bd89-07d5-4fa7-a2bb-11800ed34869 f3bd89-07d5-4fa7-a2bb-11800ed34869 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Milan, Ohio (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: General Service- Large Sector: Commercial Description: Available to customers receiving service at Village's primary distribution voltage and guaranteeing a minimum load of 300 kW. The Capacity, Reactive, and Energy Charges will be based on the Villages incremental power supply costs, including transmission related charges, dispatch fees, service fees and losses. Source or reference: ISU Documentation

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:E5198e9a-51ab-45e8-b24a-47f3d1a2fb05 | Open Energy Information  

Open Energy Info (EERE)

e9a-51ab-45e8-b24a-47f3d1a2fb05 e9a-51ab-45e8-b24a-47f3d1a2fb05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntingburg, Indiana (Utility Company) Effective date: 2007/01/01 End date if known: Rate name: Municipal Street Lighting- (Incandescent 300 W) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

162

Data:A8a94838-387b-4b60-a575-5d6196f3cced | Open Energy Information  

Open Energy Info (EERE)

387b-4b60-a575-5d6196f3cced 387b-4b60-a575-5d6196f3cced No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanton, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: "A3" Multi-Phase Service Sector: Commercial Description: Service availability is restricted to customers located in the assigned service territory of the former Rideta Electric Cooperative. Applicable for multi-phase service through a demand meter to a member-consumer using the Cooperative's standard Source or reference: http://www.swiarec.coop/forms/tariff.pdf Source Parent:

163

Data:D998d3f3-bd40-4cfa-966b-7fcadb9f496c | Open Energy Information  

Open Energy Info (EERE)

d3f3-bd40-4cfa-966b-7fcadb9f496c d3f3-bd40-4cfa-966b-7fcadb9f496c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate N733 - In Town Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

164

Data:E1e0f3a8-321e-4e0a-9997-994d505b786e | Open Energy Information  

Open Energy Info (EERE)

f3a8-321e-4e0a-9997-994d505b786e f3a8-321e-4e0a-9997-994d505b786e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Central Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: 33- Single Phase Commercial, Non-residential (Leased Areas) Sector: Commercial Description: Leased Areas - Bazile Mills, Brunswick, Center, Orchard, Page, Royal, & Winnetoon, Source or reference: http://www.ncppd.com/rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

165

Data:Dfa6f82d-6ac2-4973-952f-3ab55981d083 | Open Energy Information  

Open Energy Info (EERE)

Dfa6f82d-6ac2-4973-952f-3ab55981d083 Dfa6f82d-6ac2-4973-952f-3ab55981d083 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decashield MH 1000 W Non Wood Pole Sector: Lighting Description: Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

166

Data:8e585c98-ec9a-40f3-a774-69b83833f778 | Open Energy Information  

Open Energy Info (EERE)

c98-ec9a-40f3-a774-69b83833f778 c98-ec9a-40f3-a774-69b83833f778 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Alliance, Nebraska (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Irrigation- Four Day Control Sector: Commercial Description: Source or reference: http://www.cityofalliance.net/DocumentView.aspx?DID=161 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

167

Data:29285a91-48d5-4ea4-8357-594f3eaa9abf | Open Energy Information  

Open Energy Info (EERE)

48d5-4ea4-8357-594f3eaa9abf 48d5-4ea4-8357-594f3eaa9abf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Public Power District Effective date: 2013/01/01 End date if known: Rate name: RURAL RESIDENTIAL AND FARM SERVICE Sector: Residential Description: Available: At points on the District's existing distribution facilities located in rural areas. Applicable: To single family private dwelling units, including adjacent farm buildings, and for other ordinary farm use where service is supplied through one meter. Not available for crop irrigation. Source or reference: http://www.southernpd.com/rrandfarmrate.pdf

168

Data:372f062d-1c52-44b6-83f3-3ab034e0355a | Open Energy Information  

Open Energy Info (EERE)

1c52-44b6-83f3-3ab034e0355a 1c52-44b6-83f3-3ab034e0355a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: General service (E 31) Sector: Commercial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

169

Data:475b412d-a1c8-4051-bcd0-e57f3ac050ad | Open Energy Information  

Open Energy Info (EERE)

d-a1c8-4051-bcd0-e57f3ac050ad d-a1c8-4051-bcd0-e57f3ac050ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Directional Floodlight- HPS 1000 Watt (UG) Sector: Lighting Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

170

Data:F05501ce-540b-491a-8fd2-af084a9df7f3 | Open Energy Information  

Open Energy Info (EERE)

ce-540b-491a-8fd2-af084a9df7f3 ce-540b-491a-8fd2-af084a9df7f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate N725 - Fringe Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

171

Data:5545a2b8-c013-4068-9edb-5cef8f3dec5e | Open Energy Information  

Open Energy Info (EERE)

c013-4068-9edb-5cef8f3dec5e c013-4068-9edb-5cef8f3dec5e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2010/03/02 End date if known: Rate name: Traffic Signal Service Sector: Commercial Description: Source or reference: http://www.sawnee.com/Rate%20Pdfs/TS-17.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

172

Data:F6864d07-f3a6-4fcc-8698-6078926186c5 | Open Energy Information  

Open Energy Info (EERE)

-f3a6-4fcc-8698-6078926186c5 -f3a6-4fcc-8698-6078926186c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting- LS- Part B (100W HPS) Sector: Lighting Description: Applicable for outdoor lighting for individual customers. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

173

Data:81a070e1-f42b-42e5-a948-e8cdaeb1b2f3 | Open Energy Information  

Open Energy Info (EERE)

a070e1-f42b-42e5-a948-e8cdaeb1b2f3 a070e1-f42b-42e5-a948-e8cdaeb1b2f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: 2013/09/30 Rate name: Maui - TOU EV Residential Time-Of-Use Service with Electric Vehicle Pilot - Three Phase Sector: Residential Description: This Schedule is applicable to residential service customers who combine lighting, heating, cooking, air conditioning, and power in a single family dwelling unit, metered and billed separately, with charging of batteries of on-road electric vehicles. Source or reference: www.mauielectric.com

174

Data:A6a56848-f3a9-4690-bdb0-c1cf23310c21 | Open Energy Information  

Open Energy Info (EERE)

6848-f3a9-4690-bdb0-c1cf23310c21 6848-f3a9-4690-bdb0-c1cf23310c21 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: Street Lighting, LED Retrofit: LED, Type 40 Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($3.45) and the "Usage" charge ($1.83). When applicable: add $3.24 to the "Facilities" charge for Wood Pole, add $6.74 to the "Facilities" charge for Metal Round Pole Aluminum, add $11.33 to the "Facilities" charge for Metal Round Steel Decorative

175

Data:F14070be-f3f0-4ed6-bb5e-5e1380be02c6 | Open Energy Information  

Open Energy Info (EERE)

be-f3f0-4ed6-bb5e-5e1380be02c6 be-f3f0-4ed6-bb5e-5e1380be02c6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Gs-1 General Service Three Phase less than 50kW Demand Sector: Commercial Description: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

176

Data:91f37067-d1c0-4535-97f3-d4c37ca84b7a | Open Energy Information  

Open Energy Info (EERE)

67-d1c0-4535-97f3-d4c37ca84b7a 67-d1c0-4535-97f3-d4c37ca84b7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New River Light & Power Co Effective date: 2013/01/25 End date if known: Rate name: 100 Watt SV TOB Sector: Lighting Description: Source or reference: http://nrlp.appstate.edu/retail-rate-schedule Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

177

Data:214b16d3-bad0-4126-8f3b-885e301e6435 | Open Energy Information  

Open Energy Info (EERE)

-bad0-4126-8f3b-885e301e6435 -bad0-4126-8f3b-885e301e6435 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Steuben County Rural E M C Effective date: 2012/02/01 End date if known: Rate name: Security and Street Light Services: Energy Only 175W Sector: Lighting Description: Security and Street Light Services: Energy Only 175W Unmetered service for lamps owned and maintained by members. Source or reference: http://www.remcsteuben.com/sites/remcsteuben.coopwebbuilder.com/files/current_rate_schedule-_03-2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

178

Data:Fee7418c-3a41-4178-b2de-9de44c35f3f4 | Open Energy Information  

Open Energy Info (EERE)

Fee7418c-3a41-4178-b2de-9de44c35f3f4 Fee7418c-3a41-4178-b2de-9de44c35f3f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (77 W LED HP without Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

179

Data:766f11c9-f3f2-4ca7-9cdd-64893b4b3b72 | Open Energy Information  

Open Energy Info (EERE)

-f3f2-4ca7-9cdd-64893b4b3b72 -f3f2-4ca7-9cdd-64893b4b3b72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 1000 watt Aquila Yard Light Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

180

Data:D2111dd8-680d-4ff1-8272-3ec3e17f3bf7 | Open Energy Information  

Open Energy Info (EERE)

680d-4ff1-8272-3ec3e17f3bf7 680d-4ff1-8272-3ec3e17f3bf7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation CYC 1 - Time of use - Three Phase Sector: Industrial Description: Source or reference: Illinois State University binder #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:04d40670-76be-4336-95f3-64b206d0a6dc | Open Energy Information  

Open Energy Info (EERE)

d40670-76be-4336-95f3-64b206d0a6dc d40670-76be-4336-95f3-64b206d0a6dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: French Broad Elec Member Corp Effective date: 2009/04/01 End date if known: Rate name: Commercial Generation Three Phase Sector: Commercial Description: Plus Wholesale Purchase Power Fuel Charge (Or Credit) and Sales Tax where applicable Source or reference: http://www.frenchbroademc.com/rateschedule.cfm Source Parent: Comments The flat rate Adjustment is the Generation credit($/kwh generated) Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

182

Data:C945840d-99ed-48bb-95f3-4b6299e15546 | Open Energy Information  

Open Energy Info (EERE)

0d-99ed-48bb-95f3-4b6299e15546 0d-99ed-48bb-95f3-4b6299e15546 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange County Rural E M C Effective date: 2012/01/01 End date if known: Rate name: Rate 177- 2012 Rate Schedule for Security Lighting, Security Lighting - 400W MV (144 kwh) Sector: Lighting Description: http://www.orangecountyremc.org/electricrates.html Source or reference: http://www.orangecountyremc.org/electricrates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

183

Data:02eb4f13-7107-4c9d-adb5-d104d4f3f5a1 | Open Energy Information  

Open Energy Info (EERE)

7107-4c9d-adb5-d104d4f3f5a1 7107-4c9d-adb5-d104d4f3f5a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 1997/05/01 End date if known: Rate name: Schedule SLM-1 Sector: Residential Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

184

Data:6f5f3d50-bb76-4519-bf3b-bb79b07e2984 | Open Energy Information  

Open Energy Info (EERE)

f3d50-bb76-4519-bf3b-bb79b07e2984 f3d50-bb76-4519-bf3b-bb79b07e2984 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cartersville, Georgia (Utility Company) Effective date: End date if known: Rate name: Small Power Service,SP 2 ( commercial) Sector: Commercial Description: Applicable to all commercial or industrial electric service which is delivered or compensated to one energy standard voltage and where the following criteria are met: 1.Billing demand for the current month and the preceding 11 months must be less than or equal to 100 KW as defined in the billing demand section of this tariff.

185

Data:4cdb0960-9f3a-4a4f-b402-b84c8714c061 | Open Energy Information  

Open Energy Info (EERE)

cdb0960-9f3a-4a4f-b402-b84c8714c061 cdb0960-9f3a-4a4f-b402-b84c8714c061 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Poudre Valley R E A, Inc Effective date: 2013/01/01 End date if known: Rate name: SHL - Lighting Sales Public Street/Highway 400-Watt high pressure sodium lamp100-Watt high pressure sodium lamp Sector: Lighting Description: Available to Public Authorities for street and highway lighting from dusk to dawn, subject to the established rates and regulations, tariffs, bylaws and Articles of Incorporation of the Association. Source or reference: http://www.pvrea.com/members/index.html

186

Data:57790601-b179-450a-b77c-e3d140110f3f | Open Energy Information  

Open Energy Info (EERE)

01-b179-450a-b77c-e3d140110f3f 01-b179-450a-b77c-e3d140110f3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Street Lights: Standard Overhead 400 Watt HPS Sector: Lighting Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

187

Data:9f9f6c87-320d-454d-bf81-fb002f3e3ad9 | Open Energy Information  

Open Energy Info (EERE)

c87-320d-454d-bf81-fb002f3e3ad9 c87-320d-454d-bf81-fb002f3e3ad9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Flood light HPS - 400W - and 35 foot wood pole Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent:

188

Data:A497b42f-3c89-425f-8491-ecaa43be1829 | Open Energy Information  

Open Energy Info (EERE)

f-3c89-425f-8491-ecaa43be1829 f-3c89-425f-8491-ecaa43be1829 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.tpud.org/about_rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

189

Data:B49efb5b-a721-4dfc-8272-a5d20d4f3d95 | Open Energy Information  

Open Energy Info (EERE)

efb5b-a721-4dfc-8272-a5d20d4f3d95 efb5b-a721-4dfc-8272-a5d20d4f3d95 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: "SGS-ND" & "MGS-S" WH (Bundled) Sector: Commercial Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

190

Data:0228d657-5ab8-471c-95ca-530eb9f3aa12 | Open Energy Information  

Open Energy Info (EERE)

57-5ab8-471c-95ca-530eb9f3aa12 57-5ab8-471c-95ca-530eb9f3aa12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Flood light HPS - 1000W Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent: Comments Applicability Demand (kW)

191

Data:32897b3a-2a29-4977-b810-8ed7f3a0b478 | Open Energy Information  

Open Energy Info (EERE)

a-2a29-4977-b810-8ed7f3a0b478 a-2a29-4977-b810-8ed7f3a0b478 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Area Lighting-High Pressure Sodium-250 watts-Within Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

192

Data:Ba03f94a-6f3a-4886-98a9-470ef22f266a | Open Energy Information  

Open Energy Info (EERE)

a-6f3a-4886-98a9-470ef22f266a a-6f3a-4886-98a9-470ef22f266a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Guntersville Electric Board Effective date: 2012/10/01 End date if known: Rate name: GSA 3 Sector: Commercial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Subject to Revenue adjustment,FCA and environmental adjustment Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

193

Data:8d325f85-1c87-495b-a50f-3ec6290d33ce | Open Energy Information  

Open Energy Info (EERE)

5f85-1c87-495b-a50f-3ec6290d33ce 5f85-1c87-495b-a50f-3ec6290d33ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Commercial Electric Heat Rate Sector: Commercial Description: Available for use of electricity for electric heating by commercial establishments, churches, schools, fire halls, community halls, township halls, and similar type consumers, provided that electric heat use is metered separately from other uses of electricity. Discount: From October 1 through April 30, all separately metered kilowatt-hours used under this rate are eligible for a discount of 1¢.

194

Data:6d41fdeb-d537-4da9-a93a-65f3ad7a6953 | Open Energy Information  

Open Energy Info (EERE)

d537-4da9-a93a-65f3ad7a6953 d537-4da9-a93a-65f3ad7a6953 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: French Broad Elec Member Corp (Tennessee) Effective date: 2009/04/01 End date if known: Rate name: Small Commercial Customer Three Phase Sector: Commercial Description: Three Phase - $30.00 per month NC Renewable Energy Recovery Fee of $1.01 per month NC Energy Efficiency Rider of $3.96 per month Total $34.97 per month Plus Wholesale Purchase Power Fuel Charge (Or Credit) and Sales Tax where applicable. Source or reference: http://www.frenchbroademc.com/rateschedule.cfm Source Parent:

195

Data:C8a5447c-cf78-4549-9238-c7811d168f3d | Open Energy Information  

Open Energy Info (EERE)

47c-cf78-4549-9238-c7811d168f3d 47c-cf78-4549-9238-c7811d168f3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Lamp Fixtures Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

196

Data:9849f18d-dea6-43f3-9327-4983e3f57dc2 | Open Energy Information  

Open Energy Info (EERE)

d-dea6-43f3-9327-4983e3f57dc2 d-dea6-43f3-9327-4983e3f57dc2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mille Lacs Energy Cooperative Effective date: End date if known: Rate name: Peak Shave Water Heating Rate Sector: Residential Description: Available to members taking service concurrently under another rate schedule. This rate is for interruptible service to water heating loads. The water heating load will be interrupted no more than eight hours per day. Source or reference: Rate Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

197

Data:1fa7455b-cb2c-4621-89f3-310d8e50ae63 | Open Energy Information  

Open Energy Info (EERE)

b-cb2c-4621-89f3-310d8e50ae63 b-cb2c-4621-89f3-310d8e50ae63 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Memphis Light, Gas & Water Effective date: 2012/10/01 End date if known: 2012/09/30 Rate name: RS (Time Of Use) Sector: Residential Description: This rate shall apply only to electric service to a single-family dwelling (including its appurtenances if served through the same meter), where the major use of electricity is for domestic purposes such as lighting, household appliances, and the personal comfort and convenience of those residing therein. Hydro Allocation Credit: $1.60 per month

198

Data:02283f4f-c171-4785-aad5-67f3f5033cd2 | Open Energy Information  

Open Energy Info (EERE)

f4f-c171-4785-aad5-67f3f5033cd2 f4f-c171-4785-aad5-67f3f5033cd2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Electric Coop, Inc Effective date: 2012/04/01 End date if known: Rate name: RATE R201 (Single Phase- Residential) Sector: Residential Description: Consumers can qualify for Rate R001 by converting to electric heat. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

199

Data:Bc0d1518-7eca-44f4-8a3e-1a902027c1f3 | Open Energy Information  

Open Energy Info (EERE)

d1518-7eca-44f4-8a3e-1a902027c1f3 d1518-7eca-44f4-8a3e-1a902027c1f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: General Service Demand (October 2013) Sector: Commercial Description: Optional to all customers with demands of 25 kW or more for 3 consecutive months whose entire requirements are taken through 1 meter. Mandatory for customers with demands of 60 kW or more for two consecutive months. Not applicable to resale, stand-by, or auxiliary. Source or reference: ISU Documentation

200

Data:Aba9568b-367c-44f3-83be-f130e11718b8 | Open Energy Information  

Open Energy Info (EERE)

Aba9568b-367c-44f3-83be-f130e11718b8 Aba9568b-367c-44f3-83be-f130e11718b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Ridge Elec Member Corp Effective date: 2010/03/03 End date if known: Rate name: Residential - Three-Phase Sector: Residential Description: * The Cooperative will furnish 60-cycle service through one meter at the following approximate voltages where available: Single-phase, 120/240 Volts, or Three-phase, 208Y/120 Volts, or Three-phase, three wire, 240 Volts Prospective members should ascertain the available supply voltage at the nearest Cooperative office before acquiring equipment.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:D88f59f3-6121-43e3-b6c1-10f29ac3e213 | Open Energy Information  

Open Energy Info (EERE)

f3-6121-43e3-b6c1-10f29ac3e213 f3-6121-43e3-b6c1-10f29ac3e213 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting - Shoebox 150 Watt PMH Sector: Residential Description: Source or reference: https://www.santeecooper.com/business/equipment-leases/outdoor-lighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

202

Data:28f7f3f5-95ad-47bc-997e-eae35eaf6912 | Open Energy Information  

Open Energy Info (EERE)

f3f5-95ad-47bc-997e-eae35eaf6912 f3f5-95ad-47bc-997e-eae35eaf6912 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Florida Elec Coop, Inc Effective date: 2011/11/01 End date if known: Rate name: Rate Schedule OL- Outside Lighting (150 W HPS) Sector: Lighting Description: Applicable to all members of the Cooperative for lighting of public or private thoroughfares, parking areas, homes, farms, or businesses. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

203

Data:1154ef1b-9514-41f3-a8c6-19b81b300d6b | Open Energy Information  

Open Energy Info (EERE)

b-9514-41f3-a8c6-19b81b300d6b b-9514-41f3-a8c6-19b81b300d6b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 150W Overhead Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Cobra',Wood Pole (1)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

204

Data:93eac19e-95cc-40f5-819c-b9125d5f3da0 | Open Energy Information  

Open Energy Info (EERE)

eac19e-95cc-40f5-819c-b9125d5f3da0 eac19e-95cc-40f5-819c-b9125d5f3da0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 100 watt HPS Yard Light/Street Light Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability

205

Data:49f00575-e849-4f3d-b8ef-67dfe75e1c19 | Open Energy Information  

Open Energy Info (EERE)

575-e849-4f3d-b8ef-67dfe75e1c19 575-e849-4f3d-b8ef-67dfe75e1c19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Residential Sector: Residential Description: This schedule is available only to customers dwelling in residences, condominiums, mobile homes, or individually-metered apartments which provide independent and permanent facilities complete for living, sleeping, eating, cooking, and sanitation. Source or reference: http://www.concordnc.gov/LinkClick.aspx?fileticket=53Al67tluGU%3d&tabid=580&mid=1145

206

Data:093858f4-8f3b-49d4-95c8-fbdd5da56110 | Open Energy Information  

Open Energy Info (EERE)

8f3b-49d4-95c8-fbdd5da56110 8f3b-49d4-95c8-fbdd5da56110 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Chambersburg, Pennsylvania (Utility Company) Effective date: 2004/05/03 End date if known: Rate name: Area Lighting Rate- Customer Installed (400W) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

207

Data:7ea32fd9-7214-43f3-82c6-9302e230b584 | Open Energy Information  

Open Energy Info (EERE)

2fd9-7214-43f3-82c6-9302e230b584 2fd9-7214-43f3-82c6-9302e230b584 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wakefield, Michigan (Utility Company) Effective date: 2007/03/01 End date if known: Rate name: Industrial Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

208

Data:5c888ff1-e7fa-4df4-a96f-3b478f98b033 | Open Energy Information  

Open Energy Info (EERE)

8ff1-e7fa-4df4-a96f-3b478f98b033 8ff1-e7fa-4df4-a96f-3b478f98b033 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Cogeneration 35kV Supplemental Sector: Industrial Description: Source or reference: http://www.les.com/your_business/rate_schedules_llp.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

209

Data:6d4aa07b-5394-4c37-a0cf-d06f3e928f7d | Open Energy Information  

Open Energy Info (EERE)

b-5394-4c37-a0cf-d06f3e928f7d b-5394-4c37-a0cf-d06f3e928f7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Idle Services Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

210

Data:521fbb48-b915-45ee-bbac-39f6f79f3ba3 | Open Energy Information  

Open Energy Info (EERE)

fbb48-b915-45ee-bbac-39f6f79f3ba3 fbb48-b915-45ee-bbac-39f6f79f3ba3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(Unmetered 100 W.H.P Sodium) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

211

Data:Eea3ce0f-3f16-461e-a25a-596d77769915 | Open Energy Information  

Open Energy Info (EERE)

Eea3ce0f-3f16-461e-a25a-596d77769915 Eea3ce0f-3f16-461e-a25a-596d77769915 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: INSTITIONAL SERVICE RATE 60000 Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

212

Data:C0f496ec-70c9-4416-a95f-3e253453fbf0 | Open Energy Information  

Open Energy Info (EERE)

96ec-70c9-4416-a95f-3e253453fbf0 96ec-70c9-4416-a95f-3e253453fbf0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kerrville Public Utility Board Effective date: 2000/01/01 End date if known: Rate name: Temporary connection charge-install and remove transformer on existing pole Sector: Commercial Description: made for 120/240 volt, single phase, three wire, 60 Hertz. Charges for temporary service not covered by these standard conditions will be provided only when customer pays in advance to KPUB the estimated cost of installing and removing the necessary facilities. Source or reference: http://www.kpub.com/portals/0/PDFs/rates®s.pdf

213

Data:158ee901-e6b0-47f3-bc12-931525bd1a7e | Open Energy Information  

Open Energy Info (EERE)

ee901-e6b0-47f3-bc12-931525bd1a7e ee901-e6b0-47f3-bc12-931525bd1a7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Consumer Provide Relamping (Traffic Signal) Sector: Lighting Description: Each Additional Increment of 60 Watts of Demand : $1.79. Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

214

Data:4d1c83c3-f0ad-4cf4-a815-7ea08e3862f3 | Open Energy Information  

Open Energy Info (EERE)

c3-f0ad-4cf4-a815-7ea08e3862f3 c3-f0ad-4cf4-a815-7ea08e3862f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (300-399 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

215

Data:97f67e30-15ca-4545-8cf0-e17f3d1820ed | Open Energy Information  

Open Energy Info (EERE)

e30-15ca-4545-8cf0-e17f3d1820ed e30-15ca-4545-8cf0-e17f3d1820ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-3 and BGS-3 Zone 2 - General Delivery Service 600V or Less Sector: Industrial Description: Availability: Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that has demand metering installed and a maximum monthly Demand equal to or greater than 150 kilowatts (kW) but less than 1,000 kW as qualified in the Delivery Service Rate Reassignment section.

216

Data:4162d463-1f3a-4421-b135-b43a8695f8ed | Open Energy Information  

Open Energy Info (EERE)

63-1f3a-4421-b135-b43a8695f8ed 63-1f3a-4421-b135-b43a8695f8ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Public Service Co (Texas) Effective date: 2013/05/01 End date if known: Rate name: 30' wood pole underground Sector: Lighting Description: Source or reference: http://www.xcelenergy.com/staticfiles/xe/Corporate/Corporate%20PDFs/tx_sps_e_entire.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

217

Data:7a10484b-f3bb-4f27-a288-caae8a8b5d3f | Open Energy Information  

Open Energy Info (EERE)

b-f3bb-4f27-a288-caae8a8b5d3f b-f3bb-4f27-a288-caae8a8b5d3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2012/03/01 End date if known: Rate name: Experimental Rate Schedule - General Service - Greater than 400 Amp Service Sector: Industrial Description: Source or reference: https://www.crpud.net/about-us/columbia-river-pud-rate-schedules/#rate-schedule------nbsp-residential-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

218

Data:49c17ecc-38c8-4a66-a1ca-4f65f3ba0fcd | Open Energy Information  

Open Energy Info (EERE)

ecc-38c8-4a66-a1ca-4f65f3ba0fcd ecc-38c8-4a66-a1ca-4f65f3ba0fcd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: General Service - Municipal (Rate Code 45) three Phase Sector: Commercial Description: Applicable to miscellaneous municipal services (excluding municipal pumping), school districts, and other non-federal agencies, which are principally tax supported. Source or reference: http://www.perennialpower.com/Images/URBAN_GENERAL_AND_PUBLIC_SERVICE.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

219

Data:1124317f-5652-47f3-8d31-694fcafda1a3 | Open Energy Information  

Open Energy Info (EERE)

f-5652-47f3-8d31-694fcafda1a3 f-5652-47f3-8d31-694fcafda1a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Pitcairn, Pennsylvania (Utility Company) Effective date: End date if known: Rate name: Commercial Electric Service (Single Phase) Sector: Commercial Description: Available to any customer for light, heat, power and/or other purposes. Source or reference: http://pitcairnborough.us/ordinances/Chapter%2022%20Electric%20Power%20Service.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

220

Data:Ca9c956f-3cdd-47e7-98f1-40228cb2d165 | Open Energy Information  

Open Energy Info (EERE)

c956f-3cdd-47e7-98f1-40228cb2d165 c956f-3cdd-47e7-98f1-40228cb2d165 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Steilacoom Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:2d222826-f3d6-45a3-a729-7e09fd1c9265 | Open Energy Information  

Open Energy Info (EERE)

22826-f3d6-45a3-a729-7e09fd1c9265 22826-f3d6-45a3-a729-7e09fd1c9265 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand River Dam Authority Effective date: 2011/07/01 End date if known: Rate name: large general service industrial-Transmission Sector: Industrial Description: transmission Source or reference: http://www.grda.com/electric/customer-service/retail-sales/large-general-service-industrial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

222

Data:F7879313-62c2-474d-8e6a-43d70f3b4366 | Open Energy Information  

Open Energy Info (EERE)

3-62c2-474d-8e6a-43d70f3b4366 3-62c2-474d-8e6a-43d70f3b4366 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Electric Power Co (Louisiana) Effective date: 2013/03/01 End date if known: Rate name: Municipal Street and Parkway Lighting - Closed offering - 100 Watt MH Sector: Lighting Description: Source or reference: http://www.swepco.com/global/utilities/lib/docs/ratesandtariffs/Louisiana/LouisianaA_06_06_2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

223

Data:F78af0f3-f023-4c53-9473-8db6b3483931 | Open Energy Information  

Open Energy Info (EERE)

f3-f023-4c53-9473-8db6b3483931 f3-f023-4c53-9473-8db6b3483931 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: Mercury Vapor - 100 Watt - Not metered Sector: Lighting Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

224

Data:512fe812-47f6-4984-940f-3d9458d8159a | Open Energy Information  

Open Energy Info (EERE)

fe812-47f6-4984-940f-3d9458d8159a fe812-47f6-4984-940f-3d9458d8159a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Hudson Gas & Elec Corp Effective date: 2012/07/01 End date if known: Rate name: S.C. No 14 Standby series ( S.C No. 2 Non Demand) Sector: Commercial Description: Source or reference: http://www.centralhudson.com/rates/index.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

225

Data:4123cfde-a698-4f22-9944-87f3fc9fc639 | Open Energy Information  

Open Energy Info (EERE)

cfde-a698-4f22-9944-87f3fc9fc639 cfde-a698-4f22-9944-87f3fc9fc639 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alaska Village Elec Coop, Inc Effective date: 2012/01/06 End date if known: Rate name: Large Power- GS-2: Alakanuk Village Sector: Industrial Description: Note: The Adjustments entered here is the sum of the "Cost of Fuel" and the "RCC". Source or reference: Rates Binder B Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

226

Data:46353747-40c1-4262-bf7d-38f3edb14b11 | Open Energy Information  

Open Energy Info (EERE)

47-40c1-4262-bf7d-38f3edb14b11 47-40c1-4262-bf7d-38f3edb14b11 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - GS - 1 Sector: Commercial Description: To any consumer, other than residential, with fixed wattage loads operating continuously throughout the billing period such as traffic signals. Renewable generating systems are not to be rated higher than 100 kW AC for the purpose of net metering. Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments Plus current month's Power Cost Adjustment and applicable taxes.

227

Data:72053874-37f3-4221-b92d-ba7f30301a4b | Open Energy Information  

Open Energy Info (EERE)

3874-37f3-4221-b92d-ba7f30301a4b 3874-37f3-4221-b92d-ba7f30301a4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Wheatland, Wyoming (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 400W Mercury Vapor Sector: Lighting Description: To consumers within the service territory of the Association, subject to the rules and regulations of the Association and of Regulatory Authorities. Source or reference: http://psc.state.wy.us/htdocs/tariffs/wy_whe1/0001a.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

228

Data:19316f8d-0f3d-4943-86e7-82d72b143303 | Open Energy Information  

Open Energy Info (EERE)

d-0f3d-4943-86e7-82d72b143303 d-0f3d-4943-86e7-82d72b143303 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Public Power District Effective date: 2013/01/01 End date if known: Rate name: RESIDENTIAL CABIN SERVICE Sector: Residential Description: Available: At points on the District's existing distribution facilities located in rural areas. Applicable: To cabin or resort residential service where occupancy is seasonal and temporary in nature. Not available for permanent residence in excess of 60 days, for multiple family living unit installations, or if annual usage exceeds 15,000 kWh. This rate is not available for crop irrigation.

229

Data:Dcb0bb5d-9daa-4fa8-ae67-e50d304205f3 | Open Energy Information  

Open Energy Info (EERE)

Dcb0bb5d-9daa-4fa8-ae67-e50d304205f3 Dcb0bb5d-9daa-4fa8-ae67-e50d304205f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Ms-1 General Lighting Service: Ornamental 100 W HPS Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting, yard and security lighting, and athletic field lighting. Power Cost Adjustment Clause: Charge per all kWh varies monthly. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=350 Source Parent:

230

Data:3e26962f-47b5-4f3a-aa70-807922dfa957 | Open Energy Information  

Open Energy Info (EERE)

f-47b5-4f3a-aa70-807922dfa957 f-47b5-4f3a-aa70-807922dfa957 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navopache Electric Coop, Inc Effective date: 2012/08/01 End date if known: Rate name: 400 Watt MVL 175 kWh Cooperative Owned Sector: Lighting Description: Source or reference: http://navopache.coopwebbuilder.com/sites/navopache.coopwebbuilder.com/files/security_lights_2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

231

Data:361844cd-12f3-49ab-b299-14b94674ee76 | Open Energy Information  

Open Energy Info (EERE)

2f3-49ab-b299-14b94674ee76 2f3-49ab-b299-14b94674ee76 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 23L - ANNEXATION AREA - THREE-PHASE SERVICE - LARGE Sector: Commercial Description: (a) Available to members of the Cooperative for residential, farm, public building, commercial and industrial requiring single phase service or three phase service subject to the Cooperative's established rules and regulations and rates as established or as may from time to time be adopted by the seller.

232

Data:164bd87f-5b41-466c-bbc0-82c037b1a1f3 | Open Energy Information  

Open Energy Info (EERE)

bd87f-5b41-466c-bbc0-82c037b1a1f3 bd87f-5b41-466c-bbc0-82c037b1a1f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Valley Energy Inc Effective date: 2011/10/01 End date if known: Rate name: R-1 Farm and Residential Service Sector: Residential Description: APPLICABLE: To farm and residential loads within the Cooperative's service area, subject to the established rules and regulations of the Cooperative and Regulatory Authorities. AVAILABLE: To Consumers that receive service through one meter for each household consisting of an individual family of one or more persons. Source or reference: http://psc.state.wy.us/htdocs/tariffs/wy_low1/0002a.pdf

233

Data:5aa5f3ef-6fd6-4b77-9723-04528f59bc49 | Open Energy Information  

Open Energy Info (EERE)

f3ef-6fd6-4b77-9723-04528f59bc49 f3ef-6fd6-4b77-9723-04528f59bc49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 100 W HPS(Wood Pole-Distribution) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting and private security lighting. The utility will furnish, install, and maintain all lighting units. Metering: In lieu of metering each lamp unit, the utility will meter one or more of each size and type of lamp unit that operates for a similar time period each month. Each unit of the same size, type and on-time period shall be billed the average amount of energy as used by the metered unit(s) of the same size, type and on-time period. Pole Charges: Wood - Distribution $1.00 per lamp per month Wood- Stand Alone $3.25 per lamp per month Fiberglass $6.25 per lamp per month Steel $8.00 per lamp per month

234

Data:18ade5f3-e93c-4924-b557-639d3a9c10a6 | Open Energy Information  

Open Energy Info (EERE)

ade5f3-e93c-4924-b557-639d3a9c10a6 ade5f3-e93c-4924-b557-639d3a9c10a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Electric Coop, Inc Effective date: 2013/07/01 End date if known: Rate name: Schools Sector: Commercial Description: *Available for all schools, subject to the established rules and regulations of the Cooperative. The minimum monthly charge under this rate shall be the higher of a) $1.69 per day; or b) $1.00/kVA of transformer capacity. Source or reference: http://www.ueci.coop/content/rates-charges-0 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

235

Data:026252f1-6b41-4fee-9f3f-7cce15266aee | Open Energy Information  

Open Energy Info (EERE)

2f1-6b41-4fee-9f3f-7cce15266aee 2f1-6b41-4fee-9f3f-7cce15266aee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

236

Data:A35113f3-2e49-40df-a5a3-41ec6cbdfc81 | Open Energy Information  

Open Energy Info (EERE)

113f3-2e49-40df-a5a3-41ec6cbdfc81 113f3-2e49-40df-a5a3-41ec6cbdfc81 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: End date if known: Rate name: Rate Code 40/45 Commercial Service Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

237

Data:7b3f99f3-53e6-4924-803a-4ee64a5bafa3 | Open Energy Information  

Open Energy Info (EERE)

f99f3-53e6-4924-803a-4ee64a5bafa3 f99f3-53e6-4924-803a-4ee64a5bafa3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Meriwether Lewis Electric Coop Effective date: 2012/06/01 End date if known: Rate name: MANUFACTURING TOU RATE (MSB) Sector: Industrial Description: MANUFACTURING TOU RATE (MSB)=(5,001-15,000 kW) Source or reference: http://www.mlec.com/aboutMLEC/Rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

238

Data:21c759f3-8c8e-4290-bd59-337c7407db1b | Open Energy Information  

Open Energy Info (EERE)

9f3-8c8e-4290-bd59-337c7407db1b 9f3-8c8e-4290-bd59-337c7407db1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pennsylvania Electric Co (Pennsylvania) Effective date: 2012/12/01 End date if known: Rate name: GS-LARGE (Large General Service) Sector: Commercial Description: This Rate is available to non-Residential Customers using electric service through a single delivery location for lighting, heating and/or power service whose registered demand is equal to or greater than 400 KW in two (2) consecutive months and Off-peak Thermal Storage Customers whose registered demand is equal to or greater than 100 KW in two (2) consecutive months. THE OFF-PEAK THERMAL STORAGE PROVISION SHALL BE RESTRICTED TO EXISTING CUSTOMERS AT EXISTING LOCATIONS AS OF JANUARY 11, 2007. Secondary voltage shall be supplied to Customers at a single transformer location when load does not require transformer capacity in excess of 2,500 KVA. Upon a Customer's request, the Company may, at its option, provide transformers having a capacity of greater than 2,500 KVA.

239

Data:65c01375-b6ca-4bd9-9ec6-9f3ac6ed3cc6 | Open Energy Information  

Open Energy Info (EERE)

375-b6ca-4bd9-9ec6-9f3ac6ed3cc6 375-b6ca-4bd9-9ec6-9f3ac6ed3cc6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Time of Use Demand Electric Rates TOU-1 Sector: Commercial Description: this rate is applicable to all non-residential customers whose highest annual pick demand exceeds 50 KW. Subject to Power Cost Adjustment. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

240

Data:1bdd61fd-c018-4cc0-852d-d0f3aafdc93c | Open Energy Information  

Open Energy Info (EERE)

bdd61fd-c018-4cc0-852d-d0f3aafdc93c bdd61fd-c018-4cc0-852d-d0f3aafdc93c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mt Pleasant, Tennessee (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: General Power - Part 3 - (1,001 - 5,000 kW) Sector: Industrial Description: Source or reference: http://mountpleasantpower.com/PowerSystem/Services_Fees_files/Current%20Rates%20June%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:C66838d5-85f3-4a7e-89f4-5264fb348fa7 | Open Energy Information  

Open Energy Info (EERE)

d5-85f3-4a7e-89f4-5264fb348fa7 d5-85f3-4a7e-89f4-5264fb348fa7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Private Area Light-100W(On Existing Pole-100% Cooperative Investment Option) Sector: Lighting Description: Unmetered Facilities. The average consumption per month is 40kWh Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

242

Data:C02dc9c9-d0f3-4699-ac09-11a7073d049a | Open Energy Information  

Open Energy Info (EERE)

c9-d0f3-4699-ac09-11a7073d049a c9-d0f3-4699-ac09-11a7073d049a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Security Light MV 175 W 35' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

243

Data:1595c353-64c1-46f3-bdcf-733f9dd30ecd | Open Energy Information  

Open Energy Info (EERE)

3-64c1-46f3-bdcf-733f9dd30ecd 3-64c1-46f3-bdcf-733f9dd30ecd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 Small Power Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

244

Data:C645e0aa-66f3-4342-9bd4-b0f87af6c1c6 | Open Energy Information  

Open Energy Info (EERE)

5e0aa-66f3-4342-9bd4-b0f87af6c1c6 5e0aa-66f3-4342-9bd4-b0f87af6c1c6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Municipal street lighting-Mercury Vapor 250 watts Sector: Lighting Description: Energy service only to municipalities owning, operating, and maintaining a street lighting system and limited to locations where secondary service is available. Traffic control lighting service may be rendered under this rate providing the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

245

Data:69daf6bc-7294-41c1-95c4-558bec598f3d | Open Energy Information  

Open Energy Info (EERE)

daf6bc-7294-41c1-95c4-558bec598f3d daf6bc-7294-41c1-95c4-558bec598f3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Industrial Power Service for Air Separation & Hydrogen Production Market Customers Sector: Industrial Description: TO WHOM AVAILABLE Available to Industrial Customers primarily in the air separation and hydrogen production process industry whose facilities are located in Indiana adjacent to existing sub-transmission and transmission electric facilities having capacity sufficient to meet the Customer's requirements, subject to the conditions set forth in this Rate Schedule and the Company Rules. Total capacity available under this Rate Schedule is limited to 285,000 kilowatts. Customer shall contract for a definite amount of electrical capacity which shall be no less than 150,000 kilowatts, which may include the aggregation of multiple delivery points to facilitate interruption of load. Customer shall also contract for at least 40 percent (40%) of its total electric load as interruptible in accordance with Option D under Rider 675.

246

Data:E3d96886-005b-48cc-b5ca-f9ceecfea3f3 | Open Energy Information  

Open Energy Info (EERE)

6886-005b-48cc-b5ca-f9ceecfea3f3 6886-005b-48cc-b5ca-f9ceecfea3f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Cp-1 Small Power Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

247

Data:300f3281-74f3-4ca8-9a19-20c52fc52e22 | Open Energy Information  

Open Energy Info (EERE)

f3281-74f3-4ca8-9a19-20c52fc52e22 f3281-74f3-4ca8-9a19-20c52fc52e22 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACTON General Service SB-T2 (C8/C9) (F8/F9) Supplemental Service Sector: Industrial Description: Service under this rate is available for all use at a single location on contiguous private property subject to the specific availability and billing provisions of the rate schedule under which this electric load would be served absent the supply provided by the Generation Units ("Applicable Rate

248

Data:0ff9d81d-4cdb-48b6-8016-6285002c39f3 | Open Energy Information  

Open Energy Info (EERE)

ff9d81d-4cdb-48b6-8016-6285002c39f3 ff9d81d-4cdb-48b6-8016-6285002c39f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Ms-1 Street Lighting Service 100 W LED(Utility Owned and Maintained) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

249

Data:8b7e248f-fd7e-420f-af31-aec4fd4f3b24 | Open Energy Information  

Open Energy Info (EERE)

b7e248f-fd7e-420f-af31-aec4fd4f3b24 b7e248f-fd7e-420f-af31-aec4fd4f3b24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: UNS Electric, Inc Effective date: 2011/07/01 End date if known: Rate name: RES-01 - Residential Sector: Residential Description: Applicable with Rider REST-TS1 and Rider R-2 charges. This service is normally provided at one point of delivery measured through one meter and is restricted to private single family dwellings or individually metered apartments. More than one service and meter may be provided in instances where such is permitted under 230.2 (A) through (D) of the National Electric Code with prior approval of the Unisource Electric Engineering Department.

250

Data:Fab83db3-87fa-4366-9c25-0f59083c8f3a | Open Energy Information  

Open Energy Info (EERE)

Fab83db3-87fa-4366-9c25-0f59083c8f3a Fab83db3-87fa-4366-9c25-0f59083c8f3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

251

Data:56bce06f-3e21-4f33-9d39-322ae527e2c1 | Open Energy Information  

Open Energy Info (EERE)

bce06f-3e21-4f33-9d39-322ae527e2c1 bce06f-3e21-4f33-9d39-322ae527e2c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE CO - Commercial -- Other Sector: Commercial Description: Available only for support of consumers classified as other than Residential, Commercial/Governmental, of Industrial. Qualification for this rate is restricted to church buildings in which only activities of a religious nature are performed. The buildings may not be used as residences, nor may they serve as facilities for Commercial/Governmental or Industrial operations.

252

Data:0de4ec50-7bc4-4786-962a-6624a1518f3a | Open Energy Information  

Open Energy Info (EERE)

ec50-7bc4-4786-962a-6624a1518f3a ec50-7bc4-4786-962a-6624a1518f3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: General Service Primary(GP)-Charges for Customer Voltage Level 3 (CVL 3) Sector: Commercial Description: Subject to any restrictions, this rate is available to any customer, political subdivision or agency of the State of Michigan, either acting separately or in combinations permitted under the laws of this state, desiring Primary Voltage service for general use or for public potable water pumping and/or waste water system(s). This rate is available to existing Full Service Customers with an electric generating facility interconnected at a primary voltage level utilizing General Service Primary Rate GP for standby service on or before June 7, 2012. The amount of retail usage shall be determined on an hourly basis. Customers with a generating installation are required to have an Interval Data

253

Data:A5535ac7-c9b8-4f3f-8f1b-2b9434911fec | Open Energy Information  

Open Energy Info (EERE)

35ac7-c9b8-4f3f-8f1b-2b9434911fec 35ac7-c9b8-4f3f-8f1b-2b9434911fec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/01/01 End date if known: Rate name: General Service, 400 Amp Service or less Sector: Commercial Description: To commercial and general service Customers not subject to other specific rate schedules, and whose service entrance requirements are single-phase, 400 amps or less or three-phase, 200 amps or less. Minimum Monthly Charge The Customer Charge shall be the minimum charge, except that a higher minimum may be specified in accordance with the PUD's line extension policy or credit and collection policy. BPA Power Cost Adjustment

254

Data:E3adfd9b-a9de-4065-b73c-f3a854e87a0f | Open Energy Information  

Open Energy Info (EERE)

adfd9b-a9de-4065-b73c-f3a854e87a0f adfd9b-a9de-4065-b73c-f3a854e87a0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2012/04/01 End date if known: Rate name: Street Light Decorative Lights 100w Sector: Lighting Description: To service furnished from dusk to dawn for the lighting of public streets, highways, alleys and parks by means of high-pressure sodium street lights installed on Emerald-owned poles. Streetlights will be served by either series or multiple circuits as Emerald may determine. The type and kind of fixtures and supports will be in accordance with Emerald's specifications. Service includes maintenance, energy, lamp, and glassware renewals.

255

Data:9d3704f3-55d0-4e21-b36d-9076b7cdfe15 | Open Energy Information  

Open Energy Info (EERE)

f3-55d0-4e21-b36d-9076b7cdfe15 f3-55d0-4e21-b36d-9076b7cdfe15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 400 watt MH - Cutoff Sector: Commercial Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

256

Data:E039ea3d-7c03-46e7-822f-3f78b7a86542 | Open Energy Information  

Open Energy Info (EERE)

ea3d-7c03-46e7-822f-3f78b7a86542 ea3d-7c03-46e7-822f-3f78b7a86542 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 50000 Lumen 400 Watt High Pressure Sodium Streetlight Customer Owned Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

257

Data:7a100dd6-0f7c-4f02-ad3d-f3b1ab128602 | Open Energy Information  

Open Energy Info (EERE)

0dd6-0f7c-4f02-ad3d-f3b1ab128602 0dd6-0f7c-4f02-ad3d-f3b1ab128602 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 400 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

258

Data:75332b4b-e4b5-428e-89c9-5f3c443013c5 | Open Energy Information  

Open Energy Info (EERE)

32b4b-e4b5-428e-89c9-5f3c443013c5 32b4b-e4b5-428e-89c9-5f3c443013c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 1993/04/01 End date if known: Rate name: Schedule DC-1 Sector: Commercial Description: Available for all uses, subject to the established rules and regulations of the cooperative, to farm and residential customers. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

259

Data:512efafe-7ac3-43f3-9da6-fa8401d6d547 | Open Energy Information  

Open Energy Info (EERE)

efafe-7ac3-43f3-9da6-fa8401d6d547 efafe-7ac3-43f3-9da6-fa8401d6d547 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler County Rural Elec Coop Effective date: 2012/01/01 End date if known: Rate name: Coincidental Demand Three Phase Sector: Industrial Description: Rate(s) Recording Meter/Billing Charge $200.00 per month Purchase Power Base Demand Charge $9.63 per Monthly Coincidental KW Transmission Demand Charge $3.46 per Monthly Coincidental KW Distribution Demand Charge $4.69 per Monthly Maximum KW Energy Charge 3.27 cents per kWh ECA 1.862 cents per kWh Minimum Bill $200.00 + $1.15 per trans KVA over 150

260

Data:Dc511320-9eac-4821-ba0d-bad9d24f3ba2 | Open Energy Information  

Open Energy Info (EERE)

11320-9eac-4821-ba0d-bad9d24f3ba2 11320-9eac-4821-ba0d-bad9d24f3ba2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Cp-1 Small Power Service with Parallel Generation(20 kW or less)- Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:C8a32aff-9df0-49bc-9af4-f3cfda223a2b | Open Energy Information  

Open Energy Info (EERE)

aff-9df0-49bc-9af4-f3cfda223a2b aff-9df0-49bc-9af4-f3cfda223a2b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

262

Data:A37d05f3-683c-49f1-a163-36c3742d5e1d | Open Energy Information  

Open Energy Info (EERE)

d05f3-683c-49f1-a163-36c3742d5e1d d05f3-683c-49f1-a163-36c3742d5e1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntsville, Alabama (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Time Differentiated Hours Use of Demand Manufacturing Rate- TDMSA Sector: Industrial Description: This rate shall be available for firm electric power requirements where (a) a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 1,000 kW but not more than 15,000 kW, (b) the major use of electricity is for activities conducted at the delivery point serving that customer which are classified with a 2-digit Standard Industrial Classification Code between 20 and 39.

263

Data:71559eea-47f4-4e73-81e8-e0d0f3b031de | Open Energy Information  

Open Energy Info (EERE)

9eea-47f4-4e73-81e8-e0d0f3b031de 9eea-47f4-4e73-81e8-e0d0f3b031de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

264

Data:652d75a6-0227-45e4-8917-c1e85d4232f3 | Open Energy Information  

Open Energy Info (EERE)

52d75a6-0227-45e4-8917-c1e85d4232f3 52d75a6-0227-45e4-8917-c1e85d4232f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Licking Rural Electric Inc Effective date: 2011/04/01 End date if known: Rate name: RESIDENTIAL SERVICE - SEASONAL RATE Sector: Residential Description: Available in all territory served by the Cooperative, in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable only for residential and farm use requiring 50 kVA or less transformer capacity, and for uses incidental thereto, supplied through one meter to each individual dwelling unit. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower, without the consent of the Cooperative. TYPE OF SERVICE Single-phase, 60 hertz, at available secondary voltages.

265

Data:92782364-4c77-4f3b-82fe-3ed372ab70a3 | Open Energy Information  

Open Energy Info (EERE)

4-4c77-4f3b-82fe-3ed372ab70a3 4-4c77-4f3b-82fe-3ed372ab70a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seneca, South Carolina (Utility Company) Effective date: End date if known: Rate name: Comm Large SPEC Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/628/Seneca%20Light%20and%20Water.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

266

Data:Fc7dc68e-5ff5-4ae4-87f3-1032c52c7109 | Open Energy Information  

Open Energy Info (EERE)

dc68e-5ff5-4ae4-87f3-1032c52c7109 dc68e-5ff5-4ae4-87f3-1032c52c7109 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Central Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: 10- Irrigation - Pivot Drive Sector: Commercial Description: Source or reference: http://www.ncppd.com/rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

267

Data:A2f1d9f6-59f3-4cb7-bf02-b7400263b3de | Open Energy Information  

Open Energy Info (EERE)

d9f6-59f3-4cb7-bf02-b7400263b3de d9f6-59f3-4cb7-bf02-b7400263b3de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule AP-2-B Sector: Commercial Description: Source or reference: http://199.44.84.82/files/AP-2-B.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

268

Data:Ea0d9586-33be-499e-82f3-25fb738f6964 | Open Energy Information  

Open Energy Info (EERE)

d9586-33be-499e-82f3-25fb738f6964 d9586-33be-499e-82f3-25fb738f6964 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orangeburg, South Carolina (Utility Company) Effective date: 2008/10/01 End date if known: Rate name: 2LS32 - 50,000 Lumens (MH) Closed Type Box, Overhead wiring Sector: Lighting Description: The following is the rate schedule for lights installed for customers on the Department's standard poles which are a part of the Department's distribution system. Source or reference: http://www.orbgdpu.com/PDF%20files/Electric%20-%20Code%202L,2P,2U%20-%20Overhead%20Private%20Lights.pdf

269

Data:11f7b0c1-3720-462a-b122-27d009f3b81b | Open Energy Information  

Open Energy Info (EERE)

b0c1-3720-462a-b122-27d009f3b81b b0c1-3720-462a-b122-27d009f3b81b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Memphis Light, Gas & Water Effective date: 2011/09/30 End date if known: Rate name: DRAINAGE PUMPING STATION RATE Sector: Commercial Description: Available for electric service not in excess of 5,000 kW to a municipality or other Governmental Agency for the operation of pumping apparatus, the use of which is occasioned by floods and is extremely intermittent. Flat rate Adjustments = TVA Fuel Cost Adjustments http://www.mlgw.com/images/content/files/pdf_rates/TVA_FCA.pdf Source or reference: http://www.mlgw.com/images/content/files/pdf_rates/DPSOct11.pdf

270

Data:49684dc7-3f8c-4e9e-9bf0-d6b403f3f80b | Open Energy Information  

Open Energy Info (EERE)

dc7-3f8c-4e9e-9bf0-d6b403f3f80b dc7-3f8c-4e9e-9bf0-d6b403f3f80b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Ark El Coop, Inc Effective date: 2012/10/24 End date if known: Rate name: Large Power Service-Three Phase Sector: Industrial Description: For service to large commercial and industrial users located on or near existing three-phase lines for all types of usage. Service under this schedule is for consumers whose load requirements exceed 175 kw. (AT) Not applicable to standby, breakdown, supplementary, resale, or shared service. Source or reference: http://www.apscservices.info/tariffs/84_elec_1.PDF

271

Data:1f590a33-1ff5-482b-91c2-e8dd847f3b0a | Open Energy Information  

Open Energy Info (EERE)

90a33-1ff5-482b-91c2-e8dd847f3b0a 90a33-1ff5-482b-91c2-e8dd847f3b0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACUSHNET General Power G-4 (41)CLC Sector: Industrial Description: This rate is available for general power purposes only at existing service locations to Customers who were taking service under this rate schedule as of February 8, 1980. This rate is not available for standby service in idle plants or buildings, or where operations have been reduced to a small part of normal capacity of the plant. For industrial service where the connected load is 50 horsepower or more, incidental lighting will be allowed. This rate is subject to the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

272

Data:A9bb7e98-0367-42ae-a2b4-ded3819dd4f3 | Open Energy Information  

Open Energy Info (EERE)

bb7e98-0367-42ae-a2b4-ded3819dd4f3 bb7e98-0367-42ae-a2b4-ded3819dd4f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Hazel Green, Wisconsin (Utility Company) Effective date: 2009/04/15 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

273

Data:A0ff17dc-06a9-4ffb-9ea6-5164d21e84f3 | Open Energy Information  

Open Energy Info (EERE)

ff17dc-06a9-4ffb-9ea6-5164d21e84f3 ff17dc-06a9-4ffb-9ea6-5164d21e84f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: D580 (Residential Home Heating) Sector: Residential Description: Applies to customers who heat the entire building solely with an electric resistant heat system, with the exception of fireplaces and coal/wood burning stoves. Hot water is produced by another fuel source. If your account is billed on a discounted Household Assistance Rate, the rate number is preceded by a "D" and the rate description will include "Household Assistance."

274

Data:4ec9a5f3-5206-482b-ba06-b3dcd2081c7e | Open Energy Information  

Open Energy Info (EERE)

f3-5206-482b-ba06-b3dcd2081c7e f3-5206-482b-ba06-b3dcd2081c7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2010/10/13 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 7am-7pm with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

275

Data:D2900903-faf3-4b7f-9d3e-7f5e1236f3ee | Open Energy Information  

Open Energy Info (EERE)

03-faf3-4b7f-9d3e-7f5e1236f3ee 03-faf3-4b7f-9d3e-7f5e1236f3ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting - The Prince George 150 Watt PMH Sector: Residential Description: Source or reference: https://www.santeecooper.com/business/equipment-leases/outdoor-lighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

276

Data:Be2f3f5c-b497-4e35-b584-e3324b8fe629 | Open Energy Information  

Open Energy Info (EERE)

f3f5c-b497-4e35-b584-e3324b8fe629 f3f5c-b497-4e35-b584-e3324b8fe629 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Medina Electric Coop, Inc Effective date: 2012/01/12 End date if known: Rate name: New Industrial Rate-Distribution Secondary Delivery>5000KW Sector: Industrial Description: *Monthly charge for industrial loads over 5000 kW. There is an additional cost of wholesale power. Power Cost - The cost of power to serve the Customer includes, but is not limited to, capacity, delivery, energy and fuel charges for the billing period plus adjustments applied to the current monthly billing to account for differences in actual purchased electricity costs billed in previous periods. The power cost will be calculated using the billing units defined in the same manner as defined in the applicable wholesale rate to the Cooperative including any ratchet provisions in the wholesale rate. The Customer's billing units for power cost may be adjusted for line losses, as determined by the Cooperative, to calculate the Customer's power cost at the wholesale supplier's metering point to the Cooperative.

277

Data:5631b7ff-73f3-471c-a637-273c470a4a92 | Open Energy Information  

Open Energy Info (EERE)

ff-73f3-471c-a637-273c470a4a92 ff-73f3-471c-a637-273c470a4a92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kingfisher, Oklahoma (Utility Company) Effective date: 2003/07/25 End date if known: Rate name: Prepaid Power Sector: Residential Description: All kWh will be at the current residential rate. A $5.00 fee is charges to remove unused power from a meter. Power sales will be during regular city business hours with a minimum purchase of $50.00 Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

278

Data:0d69e3f3-27e1-45af-bc05-5e66cdebdc14 | Open Energy Information  

Open Energy Info (EERE)

e3f3-27e1-45af-bc05-5e66cdebdc14 e3f3-27e1-45af-bc05-5e66cdebdc14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2013/05/01 End date if known: Rate name: B - Water Heating Service Sector: Residential Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. Flat rate Adjustments = Fuel Charge + Variable Production Charge APPLICABILITY This Rate Schedule shall be applicable to Customers electing service hereunder for separately metered service used for water heating, subject to the conditions set forth below. This Rate Schedule is closed to new Customers.

279

Data:01960d5a-0b4a-45f3-b2b0-421da2f1875b | Open Energy Information  

Open Energy Info (EERE)

d5a-0b4a-45f3-b2b0-421da2f1875b d5a-0b4a-45f3-b2b0-421da2f1875b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ripley, Tennessee (Utility Company) Effective date: 2013/08/01 End date if known: Rate name: Commercial TDMSA Sector: Commercial Description: We buy our electricity from the Tennessee Valley Authority, which has a history of providing lower-cost electric power. The purchase of electricity, in fact, is a large amount of Ripley Power & Light's electric cost. About 82 cents of every dollar paid by our customers for electricity is used to purchase energy from TVA. HUD(hours of use demand billing)=kWh/kW

280

Data:E40b1876-c993-40ed-91f3-382fe4b4b644 | Open Energy Information  

Open Energy Info (EERE)

876-c993-40ed-91f3-382fe4b4b644 876-c993-40ed-91f3-382fe4b4b644 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:Adb13ea2-a896-44b7-8caa-f3b1f3053bb3 | Open Energy Information  

Open Energy Info (EERE)

Adb13ea2-a896-44b7-8caa-f3b1f3053bb3 Adb13ea2-a896-44b7-8caa-f3b1f3053bb3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Portland General Electric Co Effective date: 2013/01/01 End date if known: Rate name: 89 (Large General Service Three Phase Secondary) Sector: Commercial Description: To each Large Nonresidential Customer whose Demand has exceeded 1,000 kW at least twice within the preceding 13 months, or with seven months or less of service has had a Demand exceeding 1,000 kW. Source or reference: http://www.portlandgeneral.com/our_company/corporate_info/regulatory_documents/pdfs/schedules/Sched_089.pdf

282

Data:0af43158-f79b-42f3-85f1-5bd7dce06f4e | Open Energy Information  

Open Energy Info (EERE)

af43158-f79b-42f3-85f1-5bd7dce06f4e af43158-f79b-42f3-85f1-5bd7dce06f4e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Elkhorn Rural Public Pwr Dist Effective date: 2013/01/01 End date if known: Rate name: RATE 76,77 Municipal Pumping Service Sector: Commercial Description: AVAILABLE: In the lease towns of Clearwater, Elgin and Ewing served by the District. APPLICABLE: To energy used for all municipal pumping purposes. However, at the option of the Customer, individual municipal pumping accounts can be billed under other applicable District rate schedules (i.e. General Service, General Service Demand or High Tension Service). The Miscellaneous Municipal Service Rider (MM-Rider) shall not apply to those municipal pumping accounts which are billed under other applicable District rate schedules.

283

Data:19280696-9d1c-44f3-a80a-12a25ad40f31 | Open Energy Information  

Open Energy Info (EERE)

696-9d1c-44f3-a80a-12a25ad40f31 696-9d1c-44f3-a80a-12a25ad40f31 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange & Rockland Utils Inc Effective date: 2012/04/01 End date if known: Rate name: SC16 Street Lighting Induction Overhead and Underground 150w (Customer owned, full service, single bill) Sector: Description: APPLICABLE TO USE OF SERVICE FOR: Sales and delivery of electric power supply provided by the Company or delivery of electric power supply provided by an Energy Service Company under the Company's Retail Access Program for outdoor lighting of areas, beyond the limits of public streets, highways or roadways, for use of individuals and private or public organizations where existing distribution facilities are suitable for the service requested.

284

Data:087bd2e7-0916-43f1-9bcc-6a8f3b091780 | Open Energy Information  

Open Energy Info (EERE)

16-43f1-9bcc-6a8f3b091780 16-43f1-9bcc-6a8f3b091780 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

285

Data:0b554bb8-8155-4db5-a868-d8bb081613f3 | Open Energy Information  

Open Energy Info (EERE)

bb8-8155-4db5-a868-d8bb081613f3 bb8-8155-4db5-a868-d8bb081613f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

286

Data:2a5042a2-8ea3-4f3f-ac10-665120731fe0 | Open Energy Information  

Open Energy Info (EERE)

042a2-8ea3-4f3f-ac10-665120731fe0 042a2-8ea3-4f3f-ac10-665120731fe0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/10/01 End date if known: Rate name: Large commercial schedule -outside corporate limits Sector: Commercial Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for any commercial or industrial consumer having a demand equal to or in excess of 30 KW during the current month or any of the preceding eleven months, which rates are hereby adopted; for all utility bills issued on and after October 1, 1990

287

Data:91033e24-0304-4f45-a1e8-ce8c9f3cf369 | Open Energy Information  

Open Energy Info (EERE)

4-0304-4f45-a1e8-ce8c9f3cf369 4-0304-4f45-a1e8-ce8c9f3cf369 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2012/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - NSS Flood Lights Metal Halide 400W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge+MFC. Bill Issuance Charge (per bill): $0.73, as described in General Information Section 16.J. and applicable to those customers where charges for this service classification are the only charges that appear on the customer's bill.

288

Data:2e054499-ea94-4cd1-be37-88f3a596f1de | Open Energy Information  

Open Energy Info (EERE)

ea94-4cd1-be37-88f3a596f1de ea94-4cd1-be37-88f3a596f1de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orangeburg, South Carolina (Utility Company) Effective date: 2007/05/16 End date if known: Rate name: 2SH10 - 15,000 Lumens (MH) Decorative Globe Sector: Lighting Description: The following is the rate schedule for lights installed for street lighting for the City of Orangeburg. Source or reference: http://www.orbgdpu.com/PDF%20files/Electric%20-%20Code%202L,2P,2U%20-%20Overhead%20Private%20Lights.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

289

Data:D0479c61-5f3a-425e-89a9-67caaff8ac32 | Open Energy Information  

Open Energy Info (EERE)

c61-5f3a-425e-89a9-67caaff8ac32 c61-5f3a-425e-89a9-67caaff8ac32 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lyntegar Electric Coop, Inc Effective date: 2010/05/01 End date if known: Rate name: Street Lighting Service "SL" 175 MV Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/48/1%20COOP,%20TX,%20Lyntegar%20Electric%20Cooperative%20Tariff%20For%20Electric%20Service.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

290

Data:Cfcbe2e9-7781-414f-8bf2-f3ac2391ce99 | Open Energy Information  

Open Energy Info (EERE)

Cfcbe2e9-7781-414f-8bf2-f3ac2391ce99 Cfcbe2e9-7781-414f-8bf2-f3ac2391ce99 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Street Lighting ornamental, 175w mv(E and M), 30 ft steel pole Sector: Lighting Description: street lighting,ornamental mercury vapor 175 watt(E and M only) with maximum 75kwh per lamp. Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

291

Data:9f46e5c5-458c-4864-80f3-026768cb761f | Open Energy Information  

Open Energy Info (EERE)

6e5c5-458c-4864-80f3-026768cb761f 6e5c5-458c-4864-80f3-026768cb761f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Holyoke, Massachusetts (Utility Company) Effective date: 2009/08/12 End date if known: Rate name: GENERAL SERVICE ELECTRIC SCHEDULE (INDUSTRIAL) Sector: Industrial Description: Additional Info: Following rate(s) apply: First 200 Hrs. Times Demand First 3,000 kWh at .1181 per kWh Next 12,000 kWh at .1096 per kWh Next 85,000 kWh at .1033 per kWh All over 100,000 kWh at .0949 per kWh Next 200 Hrs. Times Demand (100 KW Minimum) at .0878 per kWh All over 400 Hrs. Times Demand (100 KW Minimum) at .0728 per kWh

292

Data:6c8fddc6-18f8-4404-82ac-13e64aadf3f3 | Open Energy Information  

Open Energy Info (EERE)

fddc6-18f8-4404-82ac-13e64aadf3f3 fddc6-18f8-4404-82ac-13e64aadf3f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Post Tops HPS 100W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

293

Data:Ac8201fb-6835-4835-a5f3-dcc00d20ae66 | Open Energy Information  

Open Energy Info (EERE)

201fb-6835-4835-a5f3-dcc00d20ae66 201fb-6835-4835-a5f3-dcc00d20ae66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: 2013/01/01 End date if known: Rate name: Single-Phase Service - Residential Sector: Residential Description: This rate applies to residential and farm single-phase service requiring a 50 KVA or less transformer. This rate is not available to service for single-phase motors in excess of 10 HP or an electrical device with a potential load in excess of 20 kW unless such motor or device was installed prior to May 25,1988. Service to tankless or instant water heaters is prohibited under this rate. All services are subject to the established rules and regulations.

294

Data:B5aa925b-ac3a-41f6-8f3a-3a1c15806cac | Open Energy Information  

Open Energy Info (EERE)

25b-ac3a-41f6-8f3a-3a1c15806cac 25b-ac3a-41f6-8f3a-3a1c15806cac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- Unmetered- 70W High Pressure Sodium Sector: Lighting Description: Applicable to street and highway lighting where customer owns and maintains street lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LS2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

295

Data:444e19b9-9c6d-454b-89ad-b4850520f3fc | Open Energy Information  

Open Energy Info (EERE)

b9-9c6d-454b-89ad-b4850520f3fc b9-9c6d-454b-89ad-b4850520f3fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delta Electric Power Assn Effective date: 2008/07/01 End date if known: Rate name: 13 Street Lighting Mercury Vapor 400 Watt Sector: Lighting Description: Available to governmental entities for lighting public streets, highways, alleys, parks, rest areas, playgrounds, and other public areas with controlled lighting provided by the Association. Service is from dusk to dawn. All street lighting equipment including lamps, fixtures, controls, and the necessary street lighting circuits, transformers, and additional guys and fittings will be owner, maintained, and operated by the Association. Lamp replacement will be by the Association.

296

Data:A687b779-5f40-478a-ac5f-8a5f3ba48926 | Open Energy Information  

Open Energy Info (EERE)

7b779-5f40-478a-ac5f-8a5f3ba48926 7b779-5f40-478a-ac5f-8a5f3ba48926 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Plains Electric Coop Effective date: 2012/02/01 End date if known: Rate name: IRRIGATION SERVICE Sector: Commercial Description: Availability Available to any consumer desiring irrigation pump service. Service is subject to the established rules and regulations of the Cooperative. Type of Service Single or three phase, 60 hertz, at available primary or secondary voltages. Transformer Ownership - A discount of $0.15/KVA of contract capacity in excess of that allowed in the Transformer Capacity Charge will be applied to the bill when service is taken by the consumer at the available primary voltage. Primary Metering - A discount of $0.10/KVA of contract capacity in excess of that allowed in the Transformer Capacity Charge will be applied to the bill when the meter is installed on the primary side of the service.

297

Data:A69f8d52-eadb-49f7-bc82-2ad9ae5b2f3a | Open Energy Information  

Open Energy Info (EERE)

d52-eadb-49f7-bc82-2ad9ae5b2f3a d52-eadb-49f7-bc82-2ad9ae5b2f3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2012/04/01 End date if known: Rate name: RESIDENTIAL SERVICE SCHEDULE SDR-3 Three Phase Sector: Residential Description: APPLICABILITY Applicable to all domestic uses in single-family residences, individual apartments or small farms, supplied through a single meter and one Point of Delivery; provided that equipment and installations for space and water heating shall be subject to approval of the District. BASIC REQUIREMENTS 1. The Customer must occupy the subject premises, must be age sixty-five (65) or older and have been signed for service as a Cowlitz PUD residential electric customer for not less than the past 12 consecutive months.

298

Data:2833f3b3-9bb4-4574-a97e-2f4c557f1f44 | Open Energy Information  

Open Energy Info (EERE)

f3b3-9bb4-4574-a97e-2f4c557f1f44 f3b3-9bb4-4574-a97e-2f4c557f1f44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Commercial Time of Use (Three-Phase), Schedule TOU-C Sector: Commercial Description: Business, industrial and non-residential service. Minimum Charge shall be the highest of: (a) Customer Charge of 15.00; or (b) As prescribed by the line extension policy of the rules and regulations of the Cooperative Subject to Power Cost Adjustment and Tax Adjustment Subject to Power Cost Adjustment and Tax Adjustment

299

Data:56908e9c-f3fe-4f77-b063-ed198c8428f8 | Open Energy Information  

Open Energy Info (EERE)

e9c-f3fe-4f77-b063-ed198c8428f8 e9c-f3fe-4f77-b063-ed198c8428f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand with Parallel Generation(20 kW or less) and Excess Meter Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

300

Data:6201d58e-87f3-4a95-bed8-887ec0d5da52 | Open Energy Information  

Open Energy Info (EERE)

8e-87f3-4a95-bed8-887ec0d5da52 8e-87f3-4a95-bed8-887ec0d5da52 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Carolinas, LLC (South Carolina) Effective date: 2012/10/01 End date if known: Rate name: SGS (Small General Service) Sector: Commercial Description: Available to the individual customer with a kilowatt demand of 75 kW or less. If the customer's measured demand exceeds 75 kW during any month, the customer will be served under Schedule LGS. Source or reference: http://www.duke-energy.com/pdfs/SCScheduleSGS.pdf Source Parent: Comments Applicable to 0kW-75kW Applicability

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:6f5edd09-3f3a-41a1-a1a2-3b3682075b12 | Open Energy Information  

Open Energy Info (EERE)

edd09-3f3a-41a1-a1a2-3b3682075b12 edd09-3f3a-41a1-a1a2-3b3682075b12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Athens Utility Board Effective date: 2011/04/01 End date if known: Rate name: Outdoor Lighting: Metal Halide 175W Sector: Lighting Description: Installations charge per light: $50.00 Pole charge per month: $2.00(included in the fixed monthly charge) Source or reference: http://www.aub.org/rate_power_ol.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

302

Data:9b704daf-15f3-458e-9627-1b8b797b5fcf | Open Energy Information  

Open Energy Info (EERE)

4daf-15f3-458e-9627-1b8b797b5fcf 4daf-15f3-458e-9627-1b8b797b5fcf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cobb Electric Membership Corp Effective date: 2006/01/01 End date if known: Rate name: Outdoor Lighting Overhead Service HPS 400 W FL Pole Contribution Paid Sector: Lighting Description: Pole Contributions Wood 30' $246.00 Wood 35' $297.00 Wood 40' $382.00 Wood 45' $424.00 Source or reference: https://www.cobbemc.com/~/media/Files/CEMC/PDFs/2012%20PDF/233%20Lighting%20Rates%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

303

Data:869e878c-1f35-4254-a2f3-908a6e6544c0 | Open Energy Information  

Open Energy Info (EERE)

e878c-1f35-4254-a2f3-908a6e6544c0 e878c-1f35-4254-a2f3-908a6e6544c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rita Blanca Electric Coop, Inc Effective date: 2009/01/01 End date if known: Rate name: Dairy Facilities Sector: Commercial Description: *Subject to Power Cost Adjustment Factor and Power Factor Adjustment. Source or reference: http://ritablancaelectric.com/page5.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

304

Data:1de7908a-39f3-461c-a223-d1c2ef630ee9 | Open Energy Information  

Open Energy Info (EERE)

908a-39f3-461c-a223-d1c2ef630ee9 908a-39f3-461c-a223-d1c2ef630ee9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2013/04/01 End date if known: Rate name: Industrial Power - Subtransmission Sector: Industrial Description: * Available for general service customers. Customer's monthly billing demands under this tariff shall not be less than 600 kVA. The customer shall contract for a sufficient capacity to meet normal maximum requirements, but in no case shall the capacity contracted for be less than 1,000 kVA. Source or reference: https://www.indianamichiganpower.com/global/utilities/lib/docs/ratesandtariffs/Indiana/IM_INTB05-30-2012.pdf

305

Data:Efcc85f3-9782-4f88-b460-65dfa017ee4d | Open Energy Information  

Open Energy Info (EERE)

Efcc85f3-9782-4f88-b460-65dfa017ee4d Efcc85f3-9782-4f88-b460-65dfa017ee4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 1996/03/03 End date if known: Rate name: Special Contract - Rate "S-C" Sector: Industrial Description: This rate can apply to any commercial or industrial customer which meets the requirements of this rate where: (i) service is provided at primary or transmission voltage; (ii) new full-requirements customers with a minimum billing demand of 3,000 KVA or more; or (iii) existing full-requirements customers adding 3,000 KVA to their existing load as long as this new load is separately metered.

306

Data:0f196627-b031-41f3-8af6-4e535daf2ab8 | Open Energy Information  

Open Energy Info (EERE)

96627-b031-41f3-8af6-4e535daf2ab8 96627-b031-41f3-8af6-4e535daf2ab8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 500kW Demand Secondary Voltage Metering and Secondary Voltage Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

307

Data:34702ed8-2f91-4f3c-af4a-a423d3c483ad | Open Energy Information  

Open Energy Info (EERE)

ed8-2f91-4f3c-af4a-a423d3c483ad ed8-2f91-4f3c-af4a-a423d3c483ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wheat Belt Public Power Dist Effective date: 2013/04/01 End date if known: Rate name: Large Power (C-1) Sector: Commercial Description: Source or reference: http://www.wheatbelt.com/uploaded/pdf/13572235352013RSC-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

308

Data:8c3161bd-0e75-4937-8088-f3ad6feb8c22 | Open Energy Information  

Open Energy Info (EERE)

61bd-0e75-4937-8088-f3ad6feb8c22 61bd-0e75-4937-8088-f3ad6feb8c22 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (MH 175w, Muni Discount) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

309

Data:003589f0-3d0f-4f3a-a266-3ea0cfe36b62 | Open Energy Information  

Open Energy Info (EERE)

003589f0-3d0f-4f3a-a266-3ea0cfe36b62 003589f0-3d0f-4f3a-a266-3ea0cfe36b62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Sec A 96 Watt 40 Sector: Lighting Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Monthly Charge= Controlled Energy charge + Continuous Burning Charge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

310

Data:0448d7c6-50f3-49a1-9e55-aea98b80305b | Open Energy Information  

Open Energy Info (EERE)

c6-50f3-49a1-9e55-aea98b80305b c6-50f3-49a1-9e55-aea98b80305b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/05/01 End date if known: 2013/09/30 Rate name: Dusk-To-Dawn Lighting- Metered 400 W Luminaires Sector: Lighting Description: Applicable to any customer for private or public outdoor lighting service, whether unmetered and provided by the city, or metered. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

311

Data:4d4b175e-cc6e-49f3-aa39-28e866f72d7e | Open Energy Information  

Open Energy Info (EERE)

cc6e-49f3-aa39-28e866f72d7e cc6e-49f3-aa39-28e866f72d7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Upper Peninsula Power Co Effective date: 2013/07/01 End date if known: Rate name: A-1 - Residential Service Seasonal Sector: Residential Description: Any residential customer in a single family dwelling or a duplex using service for domestic purposes. This rate is also available to certain multiple dwellings in accordance with the standard rules. Services to garages and outbuildings not used for commercial purposes will also be classified as residential. Farm customers using electric service for the production of agricultural products for commercial purposes will be placed on the appropriate commercial rate. Optional Power Supply Service is available only to Customers not taking power supply service under rate schedule RAST, or not required to receive service under rate schedule PSDS. TERRITORY APPLICABLE: All territory served in the Company's Integrated System. CHARACTER OF SERVICE: Single-phase, alternating current, 60 hertz, nominally at 120/240 volts. This rate is subject to the Company's Power Supply Cost Recovery shown on Sheet No. D-3.00. This rate is subject to the Energy Optimization Surcharge shown on Sheet No. D-73.00.

312

Data:Cc70fe9e-728b-4f13-9d20-6e304f3a4975 | Open Energy Information  

Open Energy Info (EERE)

Cc70fe9e-728b-4f13-9d20-6e304f3a4975 Cc70fe9e-728b-4f13-9d20-6e304f3a4975 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/10/01 End date if known: Rate name: LGS-C (Large General Service) Sector: Commercial Description: Source or reference: http://mwpower.net/sites/mwpower.coopwebbuilder.com/files/10-1_effective_changes_to_rate_schedule_0.pdf Source Parent: Comments Applicable to 30kW-Infinity Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

313

Data:8067abb5-b59d-4e51-acf4-9626fe3a05f3 | Open Energy Information  

Open Energy Info (EERE)

abb5-b59d-4e51-acf4-9626fe3a05f3 abb5-b59d-4e51-acf4-9626fe3a05f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand 9am-9pm Transformer Ownership Discount Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 200kW but not greater than 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

314

Data:1c608d6b-33f3-4bd5-bbdb-d91dcf92c2b9 | Open Energy Information  

Open Energy Info (EERE)

08d6b-33f3-4bd5-bbdb-d91dcf92c2b9 08d6b-33f3-4bd5-bbdb-d91dcf92c2b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE AL OUTDOOR AREA LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 250W Sector: Lighting Description: APPLICABILITY Applicable to service for outdoor area lighting service in areas other than public streets, roads and highways, furnished from dusk to dawn where this service can be supplied from existing secondary overhead facilities of the District of suitable voltage. Applicable to District-owned outdoor area lighting equipment mounted on District-owned poles, or customer-owned supports acceptable to the District and accessible by personnel boom truck. Monthly Usage: 100kWh

315

Data:158bc8a4-41b8-4e26-8306-3a1667bb68f3 | Open Energy Information  

Open Energy Info (EERE)

a4-41b8-4e26-8306-3a1667bb68f3 a4-41b8-4e26-8306-3a1667bb68f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Park Lights 1000-Watt Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

316

Data:978f1b5f-3c3d-4e3d-a651-4a9ca2555504 | Open Energy Information  

Open Energy Info (EERE)

b5f-3c3d-4e3d-a651-4a9ca2555504 b5f-3c3d-4e3d-a651-4a9ca2555504 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(Metered 100 W.H.P Sodium) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

317

Data:Ae42ce82-48f3-4cd6-b95b-7e6100d317d3 | Open Energy Information  

Open Energy Info (EERE)

2ce82-48f3-4cd6-b95b-7e6100d317d3 2ce82-48f3-4cd6-b95b-7e6100d317d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/10/01 End date if known: Rate name: Residential-outside corporate limits Sector: Residential Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for residential installations in a single-family house, a single suite in a multiple-family house, or a single suite in a multiple apartment, a mobile housing unit or any other single-family residential unit, which rates are hereby adopted, for all utility bills issued on and after October 1, 1990

318

Data:047a4b12-0a4e-4f3d-af33-ba502a989927 | Open Energy Information  

Open Energy Info (EERE)

b12-0a4e-4f3d-af33-ba502a989927 b12-0a4e-4f3d-af33-ba502a989927 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: End date if known: Rate name: 100 Watt HPS 48 kWh Outdoor Lighting Sector: Lighting Description: Source or reference: http://psc.ky.gov/tariffs/Electric/Salt%20River%20Electric%20Coop.%20Corp/Tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

319

Data:61224d72-6082-45f3-972e-1e98b4fcb0a0 | Open Energy Information  

Open Energy Info (EERE)

2-6082-45f3-972e-1e98b4fcb0a0 2-6082-45f3-972e-1e98b4fcb0a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Weiser, Idaho (Utility Company) Effective date: End date if known: Rate name: Small General Sector: Commercial Description: Small General Source or reference: http://weiser.govoffice.com/index.asp?Type=B_BASIC&SEC={87ED382C-E2A0-45BB-8A46-E7EE24EC0A9E}&DE={0C4DDA24-4664-4D82-9C26-A271718C9810} Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

320

Data:5848ca78-14c0-47a2-95d9-202bb09f3a7c | Open Energy Information  

Open Energy Info (EERE)

8-14c0-47a2-95d9-202bb09f3a7c 8-14c0-47a2-95d9-202bb09f3a7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Upper Peninsula Power Co Effective date: 2013/07/01 End date if known: Rate name: Light and Power Service P-1 POWER SUPPLY SERVICE (Optional) Sector: Description: Capacity charge per kW if billing demand per month $10.50 per kW. Any customer for light and power purposes with a billing demand equal to or greater than 25 kW but less than 200 kW. To qualify, the customer must maintain a demand equal to or greater than 25 kW for three consecutive months and at least once in each succeeding twelvemonth period. Optional Power Supply Service is available only to Customers not taking power supply service under rate schedule RAST, or not required to receive service under rate schedule PSDS.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:Dc8491b5-e651-44f3-8d41-908580ef3a9d | Open Energy Information  

Open Energy Info (EERE)

b5-e651-44f3-8d41-908580ef3a9d b5-e651-44f3-8d41-908580ef3a9d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - NSS Safeguard HPS 940W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge+MFC. Bill Issuance Charge (per bill): $0.73, as described in General Information Section 16.J. and applicable to those customers where charges for this service classification are the only charges that appear on the customer's bill.

322

Data:030e69b6-ae48-443b-8eed-61f3dcc0bf3a | Open Energy Information  

Open Energy Info (EERE)

030e69b6-ae48-443b-8eed-61f3dcc0bf3a 030e69b6-ae48-443b-8eed-61f3dcc0bf3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: SC 62 Conventional Sector: Residential Description: New York City Customers Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

323

Data:5189795e-54f3-4a28-8c06-59db7c6b3be4 | Open Energy Information  

Open Energy Info (EERE)

795e-54f3-4a28-8c06-59db7c6b3be4 795e-54f3-4a28-8c06-59db7c6b3be4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Knoxville Utilities Board Effective date: 2013/07/01 End date if known: Rate name: OUTDOOR LIGHTING Part B- Mercury Vapor 1000W Sector: Lighting Description: Charges under this rate schedule may be increased or decreased to reflect changes in purchased power costs as determined by any purchased power adjustment adopted by the Board. The charges in this rate are limited to service from a photoelectrically controlled standard lighting fixture installed on a pole already in place. If the customer wishes to have the fixture installed at a location other than on a pole already in place, the customer shall pay an additional monthly charge of $3.00 per pole for additional poles required to serve the fixture from KUB's nearest available source. (This section does not apply to Decorative Lighting Fixtures).

324

Data:9fe584b8-228f-46f3-826e-ce213d7e9d51 | Open Energy Information  

Open Energy Info (EERE)

84b8-228f-46f3-826e-ce213d7e9d51 84b8-228f-46f3-826e-ce213d7e9d51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2013/05/06 End date if known: Rate name: RATE NO. 05-H AGRICULTURAL IRRIGATION PUMPING SERVICE Sector: Industrial Description: Applicability: To all irrigation motors other than those operated by the Maricopa Stanfield Irrigation & Drainage District for the exclusive use of pumping water for the purposes of irrigation farm fields or to fill canals which are ultimately used to irrigate fields. Source or reference: http://www.ed3online.org/view/70

325

Data:62a84d53-4c48-4785-a6ba-f3d0766dd48f | Open Energy Information  

Open Energy Info (EERE)

a84d53-4c48-4785-a6ba-f3d0766dd48f a84d53-4c48-4785-a6ba-f3d0766dd48f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of High Point, North Carolina (Utility Company) Effective date: 2012/07/06 End date if known: Rate name: Residential- All Electric- Energy Conservation Sector: Residential Description: Available only to residential customers in residences, condominiums, mobile homes, or individually metered apartments, which provide independent and permanent facilities, complete for living, sleeping, eating, cooking, and sanitation. In addition, all energy required for all water heating, cooking, clothes drying, and environmental space conditioning must be supplied electrically, and all electric energy used in such dwelling must be recorded through a single meter.

326

Data:84f88dff-90f3-42b1-a05c-30d8d4d375f0 | Open Energy Information  

Open Energy Info (EERE)

dff-90f3-42b1-a05c-30d8d4d375f0 dff-90f3-42b1-a05c-30d8d4d375f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Flood Lights-400W(On New Pole-100% Customer Investment Option) Sector: Lighting Description: Unmetered Facilities. The average consumption per month is 160kWh Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

327

Data:Fc70bfed-f3ca-45e5-9d44-228babb2af3d | Open Energy Information  

Open Energy Info (EERE)

Fc70bfed-f3ca-45e5-9d44-228babb2af3d Fc70bfed-f3ca-45e5-9d44-228babb2af3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Franklin County Effective date: 2013/05/01 End date if known: Rate name: SMALL AGRICULTURE IRRIGATION SERVICE RATE SCHEDULE NO. 3 Sector: Description: Service under this schedule shall be available throughout the District's service area for agricultural irrigation and agricultural drainage pumping installations of less than 300 horsepower, and uses incidental thereto. Type of Service Three phase, sixty-hertz alternating current at available secondary voltage. At the discretion of the District, single phase service will be provided where no single motor exceeds 10 horsepower.

328

Data:5df4866b-cc69-44f3-b60f-c90f4f085e6d | Open Energy Information  

Open Energy Info (EERE)

866b-cc69-44f3-b60f-c90f4f085e6d 866b-cc69-44f3-b60f-c90f4f085e6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Washington Elec Member Corp Effective date: End date if known: Rate name: Rate-08 (GS) Primary Sector: Description: To all electric service consumers whose measured demand exceeds XXXX kW. Electric service of one standard voltage is delivered at one point and metered at or compensated to that voltage. The consumer shall own all transformers, circuit breakers, and other equipment required for taking service at the specified primary voltage. Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=129296

329

Data:4b789117-79d4-41f3-b9de-0e5eeb18a4a2 | Open Energy Information  

Open Energy Info (EERE)

79d4-41f3-b9de-0e5eeb18a4a2 79d4-41f3-b9de-0e5eeb18a4a2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Secondary Service - Less than or equal to 10kVa - Muni Discount Rate Sector: Commercial Description: This schedule is applicable to Delivery Service for non-residential purposes at secondary voltage with demand less than or equal to 10 kVA when such Delivery Service is to one Point of Delivery and measured through one Meter and is not for shared or resale purposes. Source or reference: http://www.centerpointenergy.com/staticfiles/CNP/Common/SiteAssets/doc/CNP%20Retail%20Del%20Tariff%20Book.pdf

330

Data:41be73f5-2b61-4fcc-89f3-7136207d50b6 | Open Energy Information  

Open Energy Info (EERE)

be73f5-2b61-4fcc-89f3-7136207d50b6 be73f5-2b61-4fcc-89f3-7136207d50b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: INTERRUPTIBLE SPACE-CONDITIONING D1.1( RETAIL RESIDENTIAL) Sector: Residential Description: Available on an optional basis to Residential and Commercial customers desiring separately metered interruptible service for central air conditioning and/or central heat pump use. Customers who have more than one heat pump and/or air-conditioning unit which serves their business or home, will not be permitted to have only a portion of their load on the rate, all units will be interrupted upon the signal from the Company. Installations must conform with the Company's specifications. This rate is not available to commercial customers being billed on a demand rate.

331

Data:69693f3b-eae2-458d-82e1-4b973b83eb7d | Open Energy Information  

Open Energy Info (EERE)

93f3b-eae2-458d-82e1-4b973b83eb7d 93f3b-eae2-458d-82e1-4b973b83eb7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2010/01/01 End date if known: Rate name: NCGREENPOWER PROGRAM RIDER Sector: Residential Description: Availability - This Rider is available on a voluntary basis in conjunction with any of the Cooperative's Schedules for a Consumer who contracts with the Cooperative for a block or blocks of electricity produced from Renewable Resources provided through the NC GreenPower Program. Monthly Rate - In addition to all other charges stated in the Monthly Rate of the Schedule with which this Rider is used, the following charge shall also apply to each block the Consumer purchases: $ 4.00 per block

332

Data:F8287b1c-09f3-4aa7-9dff-4538a159a88b | Open Energy Information  

Open Energy Info (EERE)

b1c-09f3-4aa7-9dff-4538a159a88b b1c-09f3-4aa7-9dff-4538a159a88b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2012/01/01 End date if known: Rate name: LARGE GENERAL SERVICE RATE 2 Sector: Industrial Description: This schedule is available in all territory served by the District for non-residential customers with a demand of 50 kW or greater and served at 600 volts or less. This rate schedule may be used for purposes not specifically covered by other rate schedules. Minimum Charge $66.88 per month or $1.34 per month per kW of system capacity provided by the District to serve customer's requirements, whichever is greater.

333

Data:0c6e4f3b-8487-4599-b34d-9eda8d1e68ce | Open Energy Information  

Open Energy Info (EERE)

e4f3b-8487-4599-b34d-9eda8d1e68ce e4f3b-8487-4599-b34d-9eda8d1e68ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Texas-New Mexico Power Co Effective date: 2009/09/01 End date if known: Rate name: Roadway Lighting Service - (overhead service), Schedule I -Wood Pole - 100W, HPS Sector: Lighting Description: The service provided pursuant to this Tariff is for any end-use customer for roadway lighting service where existing facilities have adequate capacity and suitable voltage. Unmetered, automatically controlled, overhead lighting service operating from dusk to dawn. The Company will install, operate and maintain such lighting. Lights will be mounted on an existing service pole or poles and such service will be limited to 120 volt service.

334

Data:5f738eaf-90d1-473e-8f3b-3e50da3cdbfb | Open Energy Information  

Open Energy Info (EERE)

eaf-90d1-473e-8f3b-3e50da3cdbfb eaf-90d1-473e-8f3b-3e50da3cdbfb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: RushShelby Energy Effective date: 2012/01/01 End date if known: Rate name: Schedule LP: Large Power Service Sector: Industrial Description: AVAILABILITY Available to any member for service requiring in excess of one hundred (100) kva of transformer capacity and is located in the Cooperative's service area and located adjacent to an electric distribution line of the Cooperative's that is adequate and suitable for supplying required service. TYPE OF SERVICE Single phase, alternating current sixty (60) hertz at approximately 120/240 volts, 3-wire. Multi-phase, sixty (60) hertz, approximately 120/208 volts, 4-wire; 277/480 volts, 4-wire; or other voltages as may be mutually agreeable.

335

Data:E9c0221a-8a04-4f3a-96b8-f4b3279ff5db | Open Energy Information  

Open Energy Info (EERE)

a-8a04-4f3a-96b8-f4b3279ff5db a-8a04-4f3a-96b8-f4b3279ff5db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grayson Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule 3- Off Peak Marketing Rate Sector: Residential Description: Available to members of the Cooperative eligible for service under Tariff Schedule I-- Domestic-Farm & Home Service, or Tariff Schedule 2--Commercial and Small Power Less than 50 KVA, who have installed Cooperative approved load management devices for the use of power during off-peak hours. This rate shall only apply to programs which have been expressly approved by the Public Service Commission to be offered under the Marketing Rate of East Kentucky Power Cooperative's Wholesale Rate Schedule A.

336

Data:B39f18c5-c28a-412b-8439-1cbf303f3bb3 | Open Energy Information  

Open Energy Info (EERE)

8c5-c28a-412b-8439-1cbf303f3bb3 8c5-c28a-412b-8439-1cbf303f3bb3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2012/05/23 End date if known: Rate name: Residential with Electric Heating Sector: Residential Description: APPLICABLE: To single family residences and individually metered apartments for all domestic purposes, including water and space heating. RESIDENTIAL ELECTRIC HEATING WITH SECOND METER: Existing residential customers, where service has been provided for electric heating purposes only and is metered on a separate circuit, shall have energy use from these two services combined into one BILL. This type of electric heating service is only available to existing services and is not available for application to new service requests.

337

Data:15083f27-78f3-40fd-8a87-73548b076682 | Open Energy Information  

Open Energy Info (EERE)

f27-78f3-40fd-8a87-73548b076682 f27-78f3-40fd-8a87-73548b076682 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

338

Data:F10a15ee-65ad-4400-b5f3-1a94c1ac54da | Open Energy Information  

Open Energy Info (EERE)

ee-65ad-4400-b5f3-1a94c1ac54da ee-65ad-4400-b5f3-1a94c1ac54da No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: 2012/10/01 End date if known: Rate name: Commercial - Primary Voltage 3 MW to 20 MW Sector: Commercial Description: There are additional fees of the Community Benefit Charge and Regulatory Charge of $0.00288 per kWh respectively and $2.92 per kW respectively. Source or reference: http://www.austinenergy.com/About%20Us/Rates/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

339

Data:Ee32f3a2-ec9e-4bf8-a4ad-3ab8c61fbe7a | Open Energy Information  

Open Energy Info (EERE)

2f3a2-ec9e-4bf8-a4ad-3ab8c61fbe7a 2f3a2-ec9e-4bf8-a4ad-3ab8c61fbe7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 29 Outdoor Recreational Lighting Service (Distribution Service) Sector: Lighting Description: AVAILABLE for outdoor recreational lighting loads which are energized only between 7 p.m. and 7 a.m. Source or reference: http://www.cl-p.com/Rates/Rates_and_Tariffs/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

340

Data:08d3d34d-9884-43e7-838f-3ec5ccb7c26b | Open Energy Information  

Open Energy Info (EERE)

d34d-9884-43e7-838f-3ec5ccb7c26b d34d-9884-43e7-838f-3ec5ccb7c26b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule FL Flat Rate Service-In Excess of 50% Load Factor 201 - 400 Watt Sector: Commercial Description: Applicability This Schedule is applicable to small, constant, non-metered incidental loads for utilities, communication agencies, state agencies, and applicable special districts where the customer owns and maintains the equipment. The customer must supply equipment wattage to the District. Such loads would include: Cathodic Protection Stations Motor Radial Gates Pressure Point Automatic Watering Systems Flashing Beacons Sign Illumination Communication Power Booster Devices Monthly Usage: 197kWh

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:728f9447-81f3-403e-b588-c347ecd74949 | Open Energy Information  

Open Energy Info (EERE)

447-81f3-403e-b588-c347ecd74949 447-81f3-403e-b588-c347ecd74949 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

342

Data:573e8538-eef8-41ab-b576-32f3d13c0410 | Open Energy Information  

Open Energy Info (EERE)

e8538-eef8-41ab-b576-32f3d13c0410 e8538-eef8-41ab-b576-32f3d13c0410 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Gs-3 Large General Service Single Phase Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

343

Data:51f6084b-77f3-4535-9c35-68db164d97f5 | Open Energy Information  

Open Energy Info (EERE)

84b-77f3-4535-9c35-68db164d97f5 84b-77f3-4535-9c35-68db164d97f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2012/03/28 End date if known: Rate name: REVENUE BALANCING ACCOUNT ("RBA") PROVISION Sector: Commercial Description: Supplement to Schedule R, G, J, DS, P, F, U, TOU-R, TOU-G, TOU-J, SS, TOU EV, EV-R and EV-C. For more information, see the source of rate. Source or reference: http://www.mauielectric.com/vcmcontent/StaticFiles/FileScan/PDF/EnergyServices/Tarrifs/HECO/HECORatesRBA.pdf Source Parent: Comments Applicability Demand (kW)

344

Data:Db8e1e95-f3d1-4bdb-883e-aaac176b783d | Open Energy Information  

Open Energy Info (EERE)

e1e95-f3d1-4bdb-883e-aaac176b783d e1e95-f3d1-4bdb-883e-aaac176b783d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: Cp-3 Large Power Time-of-Day Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 250 kW per month for three or more months in a consecutive 12-month period. Fixed Monthly Charge includes Commitment to Community Rider: $75.00 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440

345

Data:4672ea7f-8f3b-4252-a39e-ad12c20f8746 | Open Energy Information  

Open Energy Info (EERE)

ea7f-8f3b-4252-a39e-ad12c20f8746 ea7f-8f3b-4252-a39e-ad12c20f8746 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2002/06/19 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems (Greater than 20kW) Sector: Description: Available for single-phase and three-phase where part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such requirements of the customer are supplied by the customer's generating facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

346

Data:D9f3a475-4cda-46bc-968f-a1d447f8edc1 | Open Energy Information  

Open Energy Info (EERE)

D9f3a475-4cda-46bc-968f-a1d447f8edc1 D9f3a475-4cda-46bc-968f-a1d447f8edc1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Los Angeles, California (Utility Company) Effective date: 2009/07/01 End date if known: Rate name: Transmission Service Sector: Commercial Description: Source or reference: https://www.ladwp.com/ladwp/faces/wcnav_externalId/a-fr-elecrate-schel?_adf.ctrl-state=g794bc8li_4&_afrLoop=114949639649000 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

347

Data:F532263c-df1d-44a9-aa8a-c997f3f8ebf4 | Open Energy Information  

Open Energy Info (EERE)

3c-df1d-44a9-aa8a-c997f3f8ebf4 3c-df1d-44a9-aa8a-c997f3f8ebf4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Raton Public Service Company Effective date: End date if known: Rate name: Commercial- Three Phase Sector: Commercial Description: To all three phase commercial and all industrial customers in the RPS service area for lighting, heating, and power purposes. Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

348

Data:C6cdf6fb-f3cb-4851-abee-ad65362075a2 | Open Energy Information  

Open Energy Info (EERE)

fb-f3cb-4851-abee-ad65362075a2 fb-f3cb-4851-abee-ad65362075a2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Gs-1 General Service Single Phase less than 50kW Demand with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

349

Data:8b0a0436-7d5d-4b1e-8a2f-3e17b310062c | Open Energy Information  

Open Energy Info (EERE)

d5d-4b1e-8a2f-3e17b310062c d5d-4b1e-8a2f-3e17b310062c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Cp-1 Small Power Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

350

Data:442e7f3f-d6ea-4b94-81f8-d6ea3741a9ab | Open Energy Information  

Open Energy Info (EERE)

f3f-d6ea-4b94-81f8-d6ea3741a9ab f3f-d6ea-4b94-81f8-d6ea3741a9ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - GSDT/LM Sector: Industrial Description: This schedule will be applicable to consumers otherwise eligible for service under Rate Schedule GSD, where the consumer's monthly maximum load is between 200 kW and 1,000 kW. Renewable generating systems are not to be rated higher than 100 kW AC for the purpose of net metering. Source or reference: https://www.clayelectric.com/rates.aspx

351

Data:01ab7429-76f3-4188-998d-196a12c2347f | Open Energy Information  

Open Energy Info (EERE)

429-76f3-4188-998d-196a12c2347f 429-76f3-4188-998d-196a12c2347f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: End date if known: Rate name: Net Billing rate Schedule A(and Distributed Generation Interconnection Standard)(Wind) Sector: Commercial Description: This Rate Schedule is available to any Member of Bartholomew County Rural Electric Membership Corporation (the "Cooperative") that is currently being billed under the Residential Electric Service Rate who has a qualified distributed generation system ("DG System") of not more than 15 kW and who desire to interconnect such DG System with the Cooperative's distribution system.In order to qualify for this Rate Schedule, the Member must meet the DG System Requirements and Interconnection Requirements specified below. Total participation under this Rate Schedule is limited, on a first come first serve basis, to those residential Members of the Cooperative applying for this rate whose aggregate DG Systems name-plate rating is equal to or less than one-tenth of one percent (0.1%) of the Cooperative's most recent peak load.

352

Data:780b7783-57f3-4f68-ae9f-2dabf87ccf2e | Open Energy Information  

Open Energy Info (EERE)

783-57f3-4f68-ae9f-2dabf87ccf2e 783-57f3-4f68-ae9f-2dabf87ccf2e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Pendent Lamp Fixture - Ornamental Pole - Company Owned - Residential Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

353

Data:E5c4f3b3-3ddd-402a-9345-695770d5c658 | Open Energy Information  

Open Energy Info (EERE)

c4f3b3-3ddd-402a-9345-695770d5c658 c4f3b3-3ddd-402a-9345-695770d5c658 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (HPS 250w, Muni Discount) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

354

Data:A0fbb549-a6f3-443a-8ff7-4745ca3867e6 | Open Energy Information  

Open Energy Info (EERE)

fbb549-a6f3-443a-8ff7-4745ca3867e6 fbb549-a6f3-443a-8ff7-4745ca3867e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northcentral Mississippi E P A Effective date: 2012/10/01 End date if known: Rate name: General Service GSA (1000 kW-5000 kW) Sector: Industrial Description: *This rate shall apply to the firm power requirements (where a customer's contract demand is 5,000 kW or less) for electric service to commercial, industrial, and governmental customers, and to institutional customers including, without limitation, churches, clubs, fraternities, orphanages, nursing homes, rooming or boarding houses, and like customers. This rate shall also apply to customers to whom service is not available under any other resale rate schedule.

355

Data:6a47cc57-32ab-4f3c-a90e-4c24af57d602 | Open Energy Information  

Open Energy Info (EERE)

cc57-32ab-4f3c-a90e-4c24af57d602 cc57-32ab-4f3c-a90e-4c24af57d602 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Commercial General Service Transmission Rate-Metering Discount Sector: Commercial Description: *This rate is available for lighting and power for those customers establishing a minimum of 3,000 KW demand. character of service:Standard transmission service voltages as provided in rules and regulations, Alternating Current 60 Hertz (cycles per second). minimum monthly charge:The minimum monthly charge will be based upon a billing demand of no less than 3,000 KW demand.

356

Data:27623791-e1f3-412d-b70d-c7016ae84873 | Open Energy Information  

Open Energy Info (EERE)

1-e1f3-412d-b70d-c7016ae84873 1-e1f3-412d-b70d-c7016ae84873 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Franklin Rural Electric Cooperative Effective date: 2010/05/01 End date if known: Rate name: Multi-Phase (100 kVa & Under) Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/199/Franklin%20Rural%20Electric%20Coop,%20IA.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

357

Data:93d6aaab-a13a-43f3-88ae-b62e516c7b57 | Open Energy Information  

Open Energy Info (EERE)

aaab-a13a-43f3-88ae-b62e516c7b57 aaab-a13a-43f3-88ae-b62e516c7b57 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Georgia Veterns Memorial State Park Rate Sector: Commercial Description: This is a special rate for the Georgia Veterans Memorial State Park. Service is metered at on point at the 12.5 kV level. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

358

Data:55bcbcba-e01e-49d2-8118-68d373012f3e | Open Energy Information  

Open Energy Info (EERE)

bcbcba-e01e-49d2-8118-68d373012f3e bcbcba-e01e-49d2-8118-68d373012f3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: Large General Service Rate D4 (Retail Service) Sector: Description: Available to customers desiring service for any purpose, except that this rate is not available for service in conjunction with the General Service Rate. Effective May 27, 1981, this rate is not available to customers desiring service through one meter for residential purposes to a single or double occupancy dwelling unit. Alternating current, single-phase, nominally at 120/240 volts, three-wire; or three-phase four-wire, Y connected at 208Y/120 volts; or under certain conditions three-phase four-wire, Y connected at 480Y/277 volts. In certain city districts, alternating current is supplied from a Y connected secondary network from which 120/208 volts, single-phase three-wire; or 208Y/120 volts, three-phase four-wire service may be taken.

359

Data:9fcbf9b4-2381-476e-a4f1-f3b22e9d7326 | Open Energy Information  

Open Energy Info (EERE)

fcbf9b4-2381-476e-a4f1-f3b22e9d7326 fcbf9b4-2381-476e-a4f1-f3b22e9d7326 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: MGS Secondary CIEP>500kW Single Phase Sector: Commercial Description: Available at any point of Company's system where facilities of adequate character and capacity exist for the entire electric service requirements of any customer delivered at one point and metered at or compensated to the voltage of delivery. This schedule is not available to residential customers. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf

360

Data:D84081f3-7109-4766-9ad2-4cd9d9b693cd | Open Energy Information  

Open Energy Info (EERE)

f3-7109-4766-9ad2-4cd9d9b693cd f3-7109-4766-9ad2-4cd9d9b693cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2006/08/01 End date if known: Rate name: GSLDR-5 General Service Large Demand Rider Sector: Description: To any customers who have executed a General Service Large Demand Rider Electric Service Agreement with JEA and whose accounts qualify for electric service under Rate Schedule GS, GST, GSDT, GSLD, GSLD, GSLDT, or MA and whose accounts in aggregate demand are no less than 699 kW or whose accounts have an average load factor equal to or greater than 65%. Resale of energy purchased under this rider is not permitted.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:331ce72c-3bff-430f-88f3-2d671e4aa4b8 | Open Energy Information  

Open Energy Info (EERE)

2c-3bff-430f-88f3-2d671e4aa4b8 2c-3bff-430f-88f3-2d671e4aa4b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2013/04/15 End date if known: Rate name: (RATE SCHEDULE 18)LARGE SERVICE - SINGLE-PHASE - 400 AMP OR GREATER Sector: Commercial Description: This rate schedule is available upon application to all member/owners with annual electric use of at least 75,000 kilowatt-hours (kWh), who agree to allow the Cooperative to interrupt all electric service for the period of time specified for all uses, including lighting, heating, and power, subject to the established rules and regulations of the Cooperative. Service under this schedule to permanent installations requires no less than 75 kVA of transformer capacity.

362

Data:8100a82f-3ccb-4ce5-b6dc-12a267a595c1 | Open Energy Information  

Open Energy Info (EERE)

0a82f-3ccb-4ce5-b6dc-12a267a595c1 0a82f-3ccb-4ce5-b6dc-12a267a595c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wahoo, Nebraska (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Industrial Large General Service (Three Phase) Sector: Industrial Description: Source or reference: http://www.wahoo.ne.us/content_subcat.asp?SubCategoryID=88&CategoryID=125&ContentID=68 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

363

Data:A46837f3-5d7e-4192-a205-8f4c7fc2f63e | Open Energy Information  

Open Energy Info (EERE)

837f3-5d7e-4192-a205-8f4c7fc2f63e 837f3-5d7e-4192-a205-8f4c7fc2f63e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Tennessee (Utility Company) Effective date: 2011/04/01 End date if known: Rate name: Genaral Power Rate-- GSD Sector: Industrial Description: This rate shall apply to the firm electric power requirements where a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 25,000 kW but not more than 15,000 kW; provided that the other conditions of this conditions are met. Source or reference: http://www.clevelandutilities.com/PDF/2011JulyElectricRates.pdf

364

Data:8bc46321-7daf-4383-a6de-2b39f3c88cd0 | Open Energy Information  

Open Energy Info (EERE)

6321-7daf-4383-a6de-2b39f3c88cd0 6321-7daf-4383-a6de-2b39f3c88cd0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Pitcairn, Pennsylvania (Utility Company) Effective date: End date if known: Rate name: Schedule R.E Sector: Residential Description: Available for full domestic electric service through one meter to individual residential customers. A. R1-Customer Charge $6.00 per monthly billing First 500 kwhs used @ 10.35 cents per kwh All over 500 kwhs used @ 9.40 cents per kwh B. R2-Charges as R1, except last 400 kwh @ 9.40 cents per kwh subject to first 300 kwhs at R1 rate. The last 400 kwh to be reduced if necessary to ensure first 300 kwhs billed at R1 rate.

365

Data:1174db4b-28c9-4a6f-afd2-543f3c52f57e | Open Energy Information  

Open Energy Info (EERE)

db4b-28c9-4a6f-afd2-543f3c52f57e db4b-28c9-4a6f-afd2-543f3c52f57e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2013/01/01 End date if known: Rate name: Rate MH - Underground Modern Fixture 250 Watt Sector: Lighting Description: Source or reference: www.uinet.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3

366

Data:27d9a985-f3ec-4f29-b76a-8ae8a707e7fe | Open Energy Information  

Open Energy Info (EERE)

a985-f3ec-4f29-b76a-8ae8a707e7fe a985-f3ec-4f29-b76a-8ae8a707e7fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: IndustrialTime -Of- Use Service-Three Phase Sector: Industrial Description: * Available for industrial customers up to 50 kVA of transformer capacity Subject to power cost adjustment and tax adjustment on-Peak period is June 20 through September 9, from 4p.m to 8p.m Source or reference: ISU Documentation Rate Binder Kelly # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

367

Data:C283d994-8f3b-40b4-9381-1faced0d89ca | Open Energy Information  

Open Energy Info (EERE)

83d994-8f3b-40b4-9381-1faced0d89ca 83d994-8f3b-40b4-9381-1faced0d89ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Acworth, Georgia (Utility Company) Effective date: 2010/04/01 End date if known: Rate name: Outdoor Lighting Service 150 W HPS-Wood Pole Sector: Lighting Description: Cobra-Head Mounted on 30' Wood Pole Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

368

Data:646c16ff-465c-4991-a82c-0f3daf68d747 | Open Energy Information  

Open Energy Info (EERE)

c16ff-465c-4991-a82c-0f3daf68d747 c16ff-465c-4991-a82c-0f3daf68d747 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2013/04/01 End date if known: Rate name: ECLS - 100 watt HPS Sector: Lighting Description: Availability of Service. Available for streetlighting service to municipalities, counties, and other governmental subdivisions. The rates are applicable to new streetlights installed after April 6, 1981, and to 50,000 lumen high pressure sodium streetlights installed before that date. Only the lamps set forth below are available for such new service. Service rendered hereunder is predicated upon the execution by the customer of an agreement specifying the type, minimum number, and location of lamps to be served.

369

Data:272cc50f-f3c7-45cd-ac75-196ee74ec5d0 | Open Energy Information  

Open Energy Info (EERE)

f-f3c7-45cd-ac75-196ee74ec5d0 f-f3c7-45cd-ac75-196ee74ec5d0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alaska Village Elec Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Residential Rate: Chevak Village Sector: Residential Description: For 1-500 kWh consumed: Rate = ( .30 + Cost of Fuel) - (PCE Adjustment) For 501-700 kWh consumed: Rate = (.30 + Cost of Fuel) Over 700 kWh consumed: Rate = (.20 + Cost of Fuel) Source or reference: http://www.avec.org/customer-service.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

370

Data:1f425ddf-3998-42bb-a1f3-43a6a7a693dd | Open Energy Information  

Open Energy Info (EERE)

5ddf-3998-42bb-a1f3-43a6a7a693dd 5ddf-3998-42bb-a1f3-43a6a7a693dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

371

Data:88d7a5db-f39e-44f3-831f-f285ce00ea49 | Open Energy Information  

Open Energy Info (EERE)

db-f39e-44f3-831f-f285ce00ea49 db-f39e-44f3-831f-f285ce00ea49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 37 - Intermediate Time-Of-Day General Electric Service (Distribution Service Primary Metering Discount) Sector: Commercial Description: AVAILABLE for the electrical requirements where the customer's maximum demand is less than 200 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters.

372

Data:3aca5136-67e4-4fb6-a05f-3cb32d2e6ccc | Open Energy Information  

Open Energy Info (EERE)

aca5136-67e4-4fb6-a05f-3cb32d2e6ccc aca5136-67e4-4fb6-a05f-3cb32d2e6ccc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of L'Anse, Michigan (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Village Electric Service (SL) Sector: Residential Description: This rate applies to customers within the Village of L'anse Source or reference: Rate Binder #3 Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

373

Data:2313d734-558b-4ca5-8f3c-7872de26fd76 | Open Energy Information  

Open Energy Info (EERE)

34-558b-4ca5-8f3c-7872de26fd76 34-558b-4ca5-8f3c-7872de26fd76 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule NM Flat Rate Service-301 - 500 watts(Winter) Sector: Commercial Description: Applicability Applicable to small, constant, non-metered incidental loads for utilities, state agencies, and applicable special districts where the customer owns and maintains the equipment. Such loads would include:  Cathodic Protection Stations  Motor Radial Gates  Pressure Point Automatic Watering Systems  Traffic Counters  Flashing Beacons  Sign Illumination Winter(Dec-May): $ 23.48 per month Summer(Jun-Nov): $ 30.21 per month

374

Data:9c96bf5f-14f3-4ffd-b4e7-259108e08cd2 | Open Energy Information  

Open Energy Info (EERE)

6bf5f-14f3-4ffd-b4e7-259108e08cd2 6bf5f-14f3-4ffd-b4e7-259108e08cd2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2012/05/17 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

375

Data:6197c379-0929-46f2-8141-645f3d7cffc3 | Open Energy Information  

Open Energy Info (EERE)

-0929-46f2-8141-645f3d7cffc3 -0929-46f2-8141-645f3d7cffc3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otero County Electric Coop Inc Effective date: 2010/03/04 End date if known: Rate name: Street and Security Lighting Service-175 W MV or 100 W HPS Sector: Lighting Description: Otero County Electric Cooperative, Inc. (OCEC), with its April 10 billing, will initiate a new program involving Energy Efficiency and rebates on certain items. The new "Energy Efficiency Fund" program will begin with the March 1 kWh usage. The program will be financed by a one percent adder to Members' bills and also by retaining the inspection and supervision fees that were previously paid to the New Mexico Public Regulation Commission (PRC). The OCEC Board of Trustees (Board) approved the basics of the fund at the January Board Meeting and will determine those programs that continue to provide the needed services to our Members.

376

Data:A45e571e-607a-48f3-a0a8-9b273309e21e | Open Energy Information  

Open Energy Info (EERE)

1e-607a-48f3-a0a8-9b273309e21e 1e-607a-48f3-a0a8-9b273309e21e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2012/01/01 End date if known: Rate name: General Service Demand - Three Phase Sector: Industrial Description: Monthly Rate: First 20 kWh or less $42.50 per mo. Next 1,980 kWh 15.0¢ per kWh Next 198,000 kWh 10.3¢ per kWh Over 200,000 7.4¢ per kWh All consumption in excess of 200 kWh 6.9¢ per kWh per kW of billing demand All consumption in excess of 400 kWh 6.6¢ per kWh per kW of billing demand All consumption in excess of 600 kWh 5.8¢ per kWh

377

Data:Fe903cc9-dd11-4dae-a1b4-a46ea617f8f3 | Open Energy Information  

Open Energy Info (EERE)

cc9-dd11-4dae-a1b4-a46ea617f8f3 cc9-dd11-4dae-a1b4-a46ea617f8f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Pine Elec Coop, Inc Effective date: End date if known: Rate name: Security Light: 400 Watt Mercury Vapor Sector: Lighting Description: Source or reference: http://www.southernpine.org/ourServices/depositsAndFees.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

378

Data:394dbac3-e310-48b4-8b9a-f3e6ba8f8312 | Open Energy Information  

Open Energy Info (EERE)

dbac3-e310-48b4-8b9a-f3e6ba8f8312 dbac3-e310-48b4-8b9a-f3e6ba8f8312 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Security Light HPS 100 W 30' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

379

Data:4062a6cc-f3c1-49f1-a4a2-df0485f343f7 | Open Energy Information  

Open Energy Info (EERE)

a6cc-f3c1-49f1-a4a2-df0485f343f7 a6cc-f3c1-49f1-a4a2-df0485f343f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule LD Street Lighting - District Owned-175 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places where Schedule LC does not apply and is available to cities, counties, lighting districts or other public bodies where the District furnishes, installs, owns, operates and maintains the complete lighting installation. Monthly Usage: 70kWh

380

Data:5bcbf0e1-5666-40b4-97f3-5a311e479c3b | Open Energy Information  

Open Energy Info (EERE)

bcbf0e1-5666-40b4-97f3-5a311e479c3b bcbf0e1-5666-40b4-97f3-5a311e479c3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: INTERRUPTIBLE SUPPLY RATE D8 Subtransmission (24 to 41.6 kV)-Full Service Sector: Commercial Description: Voltage discount $0.0010 included Available to customers desiring separately metered service at primary voltage who contract for a specified quantity of demonstrated interruptible load of not less than 50 kilowatts at a single location. Contracted interruptible capacity on this rate is limited to 150 megawatts.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:Ea57beea-8edd-412c-9657-492b43f3cd5b | Open Energy Information  

Open Energy Info (EERE)

beea-8edd-412c-9657-492b43f3cd5b beea-8edd-412c-9657-492b43f3cd5b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of New Glarus, Wisconsin (Utility Company) Effective date: 2006/03/20 End date if known: Rate name: Ms-2 Security Lighting Service 175 W MV Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0721 per kilowatt-hour.

382

Data:Cb31fc25-8718-4c84-a4f3-c875c9d8ac05 | Open Energy Information  

Open Energy Info (EERE)

Cb31fc25-8718-4c84-a4f3-c875c9d8ac05 Cb31fc25-8718-4c84-a4f3-c875c9d8ac05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Puget Sound Energy Inc Effective date: 2013/07/01 End date if known: Rate name: ALS-SVL 100 watt Sector: Lighting Description: Source or reference: http://pse.com/aboutpse/Rates/Documents/elec_sch_055.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

383

Data:A015c265-9a9d-4143-99f3-f80f1f306fd8 | Open Energy Information  

Open Energy Info (EERE)

A015c265-9a9d-4143-99f3-f80f1f306fd8 A015c265-9a9d-4143-99f3-f80f1f306fd8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coweta-Fayette El Member Corp Effective date: 2007/04/01 End date if known: Rate name: Residential Time-Of-Use Sector: Residential Description: Additional Info: Net Metering: Service to an electric consumer under which electric energy generated by the electric consumer from an eligible on-site generation facility and delivered to the local distribution facilities may be used to offset electric energy provide by the electric utility to the electric consumer during the applicable billing period. For additional information contact the EMC's engineering department.

384

Data:3985eee3-35b9-49f3-bc50-4d22fb39e4d2 | Open Energy Information  

Open Energy Info (EERE)

eee3-35b9-49f3-bc50-4d22fb39e4d2 eee3-35b9-49f3-bc50-4d22fb39e4d2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule LC Street Lighting - Customer Owned-175 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places and is available to cities, counties, lighting districts or other public bodies where the District supplies electrical energy only, and the customer furnishes, installs, owns, operates and completely maintains lighting units including switching and all other associated equipment. Monthly Usage: 70kWh

385

Data:960599e9-2a81-459a-99a9-6f93f3da58c9 | Open Energy Information  

Open Energy Info (EERE)

60599e9-2a81-459a-99a9-6f93f3da58c9 60599e9-2a81-459a-99a9-6f93f3da58c9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coweta-Fayette El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Traditionaire 150 W Sector: Lighting Description: Source or reference: http://www.utility.org/otherServices/securityLighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

386

Data:0e824466-e6e7-46e3-906f-3aacb77f51f7 | Open Energy Information  

Open Energy Info (EERE)

6-e6e7-46e3-906f-3aacb77f51f7 6-e6e7-46e3-906f-3aacb77f51f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Schedule L - 100W HPS Sector: Commercial Description: Source or reference: http://www.nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

387

Data:8ac2f3ec-2fe7-4d13-809e-bd03f64b449d | Open Energy Information  

Open Energy Info (EERE)

f3ec-2fe7-4d13-809e-bd03f64b449d f3ec-2fe7-4d13-809e-bd03f64b449d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gallatin, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: GSA 1- Less than 50 kW and not more then 15,000 kWh Sector: Commercial Description: Fuel Cost is determined during the particular season. Source or reference: http://www.gallatinelectric.com/gallatin-electric-rates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

388

Data:59fe65ab-dc72-4f1c-905c-c134bc0909f3 | Open Energy Information  

Open Energy Info (EERE)

ab-dc72-4f1c-905c-c134bc0909f3 ab-dc72-4f1c-905c-c134bc0909f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Light - 1000 watt HPS Sector: Lighting Description: APPLICABLE In all territory served. AVAILABILITY OF SERVICE Service under this schedule is offered, under the conditions set out hereinafter, for lighting applications on private property such as, but not Limited to, residential, commercial and industrial plant site or parking lot, other commercial area lighting, etc. to customers now receiving electric service from Kenergy at the same location. Service will be provided under written contract signed by customer prior to service commencing, when facilities are required other than fixture(s).

389

Data:C49263f3-c4f6-41a9-a967-7d3265326fac | Open Energy Information  

Open Energy Info (EERE)

3f3-c4f6-41a9-a967-7d3265326fac 3f3-c4f6-41a9-a967-7d3265326fac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Environmental Surcharge Rider Sector: Description: Equation: MESF = (W MESF)+O-U - RESF P(m) x L Where; MESF = the environmental surcharge adjustment rate per KWH for the current month W-MESF = the environmental surcharge amount charged by Kenergy's wholesale power supplier on the power bill for the second month preceding the month in which the MESF is applied. P(m) = the KWH purchased in the second month preceding the month in which the MESF is applied.

390

Data:2b18e683-6de6-4695-9642-ce5d1adc9f3d | Open Energy Information  

Open Energy Info (EERE)

8e683-6de6-4695-9642-ce5d1adc9f3d 8e683-6de6-4695-9642-ce5d1adc9f3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Carmel Public Utility Co Effective date: End date if known: Rate name: Light and Power Delivery Service - demand less than 10000 kW Sector: Industrial Description: AVAILABILITY: Available to any customer within territory served by Company guaranteeing a demand of not less than 2,000 kilowatts each month for billing purposes. Monthly Maximum Demand: The monthly maximum demand shall be the highest rate of use of energy during any 15 consecutive minutes occurring in such month. Company may determine the average lagging power factor each month, and if found to be less than 85 percent, the demand charge is such month shall be increased by an amount equal to 23 cents for each kilovoltampere, or fraction thereof, of capacitors required to correct the power factor from the percent to 85 percent lagging.

391

Data:Ec8513ea-9e11-42ef-8df8-f3c61b714a60 | Open Energy Information  

Open Energy Info (EERE)

ea-9e11-42ef-8df8-f3c61b714a60 ea-9e11-42ef-8df8-f3c61b714a60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(Flood Lights on Existing Pole 150W -Option E) Sector: Lighting Description: Customer-100% Cooperative-0% There is an additional $0.14 charge for the service on a new pole. Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

392

Data:4bab9d18-03e8-4f3c-b4ba-4fa84219a750 | Open Energy Information  

Open Energy Info (EERE)

bab9d18-03e8-4f3c-b4ba-4fa84219a750 bab9d18-03e8-4f3c-b4ba-4fa84219a750 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Street Lighting HPS 250w Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting. The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Source or reference: http://www.wrwwlc.com/StreetYard.aspx Source Parent: Comments Applicability Demand (kW)

393

Data:D6b2d964-50f3-426d-b425-20ba5600c415 | Open Energy Information  

Open Energy Info (EERE)

50f3-426d-b425-20ba5600c415 50f3-426d-b425-20ba5600c415 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2011/10/28 End date if known: Rate name: Street/Lighting Rate Schedules DSL - (Directional security lighting rate) MH 400W (NA) Sector: Lighting Description: For service to customers contracting for directional security lighting service from flood lighting equipment supplied by Company. The service provided pursuant to this Rate Schedule is not for the benefit of any person, firm, legal entity, or governing body other than Customer. The flood lighting equipment shall be mounted only on Company owned or controlled poles or Customer-owned poles so long as customer agrees to be responsible for any liability related to that installation.

394

Data:12cf13b4-21ad-46f3-9b4a-c10561b54a97 | Open Energy Information  

Open Energy Info (EERE)

21ad-46f3-9b4a-c10561b54a97 21ad-46f3-9b4a-c10561b54a97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Utility Type Fixtures HPS 100 W Sector: Lighting Description: *Fixed Monthly Charge does not include cost of monthly pole rates Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

395

Data:6f58b3cb-7904-46f3-8169-e1e743a4d364 | Open Energy Information  

Open Energy Info (EERE)

b3cb-7904-46f3-8169-e1e743a4d364 b3cb-7904-46f3-8169-e1e743a4d364 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service(<6000 volts) Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

396

Data:2d781c16-8823-46f3-a2ce-0552053ee14c | Open Energy Information  

Open Energy Info (EERE)

81c16-8823-46f3-a2ce-0552053ee14c 81c16-8823-46f3-a2ce-0552053ee14c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Cp-4 Large Power Time-of-Day with Coincident Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

397

Data:53e3f358-7e07-4921-bea9-f9c658461f3d | Open Energy Information  

Open Energy Info (EERE)

f358-7e07-4921-bea9-f9c658461f3d f358-7e07-4921-bea9-f9c658461f3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACTON - Residential R-2 (A-3) Sector: Residential Description: Upon written application, this rate is available for all domestic uses in a single private dwelling, in an individual apartment or in a residential condominium to any Customer meeting the qualifications stated in the special provisions section of this rate. Service under this rate to residential condominiums is available to the extent permitted by applicable regulations of the Massachusetts Department of Public Utilities (the "M.D.P.U.") and is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

398

Simply AlF3-treated Li4Ti5O12 composite anode materials for stable and ultrahigh power lithium-ion batteries  

SciTech Connect

The commercial Li4Ti5O12 (LTO) is successfully modified by AlF3 via a low temperature process. After being calcined at 400oC for 5 hours, AlF3 reacts with LTO to form a composite material which mainly consists of Al3+ and F- co-doped LTO with small amounts of anatase TiO2 and Li3AlF6. Al3+ and F- co-doped LTO demonstrates largely improved rate capability comparing to the pristine LTO. Since the amount of the byproduct TiO2 is relatively small, the modified LTO electrodes retain the main voltage characteristics of LTO with a minor feature similar to those of anatase TiO2. The doped LTO anodes deliver higher discharge capacity and significantly improved high-rate performance when compared to the pristine LTO anode. They also demonstrate excellent long-term cycling stability at elevated temperatures. Therefore, Al3+ and F- co-doped LTO synthesized at low temperature is an excellent anode for stable and ultra-high power lithium-ion batteries.

Xu, Wu; Chen, Xilin; Wang, Wei; Choi, Daiwon; Ding, Fei; Zheng, Jianming; Nie, Zimin; Choi, Young Joon; Zhang, Jiguang; Yang, Zhenguo

2013-08-15T23:59:59.000Z

399

A new lattice construction: the box product  

E-Print Network (OSTI)

In a recent paper, the authors have proved that for lattices A and B with zero, the isomorphism $Conc(A \\otimes B)\\cong Conc A \\otimes Conc B$, holds, provided that the tensor product satis?es a very natural condition (of being capped) implying that $A\\otimes B$ is a lattice. In general, $A \\otimes B$ is not a lattice; for instance, we proved that $M\\_3\\otimes F(3)$ is not a lattice. In this paper, we introduce a new lattice construction, the box product for arbitrary lattices. The tensor product construction for complete lattices introduced by G. N. Raney in 1960 and by R. Wille in 1985 and the tensor product construction of A. Fraser in 1978 for semilattices bear some formal resemblance to the new construction. For lattices A and B, while their tensor product $A\\otimes B$ (as semilattices) is not always a lattice, the box product, $A \\bp B$, is always a lattice. Furthermore, the box product and some of its ideals behave like an improved tensor product. For example, if A and B are lattices with unit, then the isomorphism $Conc(A $\\bp$ B) \\cong Conc A \\otimes Conc B$ holds. There are analogous results for lattices A and B with zero and for a bounded lattice A and an arbitrary lattice B. A join-semilattice S with zero is called {0}-representable, if there exists a lattice L with zero such that $Conc L \\cong S$. The above isomorphism results yield the following consequence: The tensor product of two {0}-representable semilattices is {0}-representable.

George Grtzer; Friedrich Wehrung

2005-01-24T23:59:59.000Z

400

Sustainable Steel Construction  

Science Conference Proceedings (OSTI)

Jul 3, 2008... House Gases, and Climate Change, Educational Resources. Spacer ... on the construction processnamely speed, prefabrication, safety,...

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Construction and Building  

Science Conference Proceedings (OSTI)

... in building sector energy consumption by improving ... housing construction: improving energy efficiency and ... Reinforced Soil Bridge Pier Load Test ...

2000-03-07T23:59:59.000Z

402

Project Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Construction Project Construction Project Construction October 16, 2013 - 5:14pm Addthis Building Design Project Construction Commisioning Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule. Construction Team

403

Wanzek Construction | Open Energy Information  

Open Energy Info (EERE)

Wanzek Construction Wanzek Construction Jump to: navigation, search Logo: Wanzek Construction Name Wanzek Construction Address 2028 2nd Avenue NW Place West Fargo, ND Zip 58078 Country United States Sector Geothermal energy, Renewable Energy, Solar, Wind energy Product Turnkey Construction Services Stock Symbol MTZ Year founded 1971 Number of employees 1100 Company Type For Profit Company Ownership Public Small Business No Minority Business Yes Affiliated Companies MasTec N.A; MasTec Renewables; Phone number 2816064172 Website http://www.wanzek.com Coordinates 29.78577°, -95.66735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.78577,"lon":-95.66735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

404

French landmark decree authorizes ITER construction | Princeton...  

NLE Websites -- All DOE Office Websites (Extended Search)

ITER construction By John Greenwald November 20, 2012 Tweet Widget Facebook Like Google Plus One The French government has capped more than two years of review by issuing a...

405

Data:7e7e3a0f-3bcc-423e-bb7c-93f5b1688e6f | Open Energy Information  

Open Energy Info (EERE)

3bcc-423e-bb7c-93f5b1688e6f 3bcc-423e-bb7c-93f5b1688e6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Street Lighting-135 Watt LPS Sector: Commercial Description: *Applicable for lighting public streets,alleys and public parks. Subject to tax and wholesale power cost. Source or reference: http://www.trico.coop/images/TRICO_SL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

406

Data:25779447-f3ab-47e4-9ca7-b005398d9d97 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:25779447-f3ab-47e4-9ca7-b005398d9d97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Weatherford Mun Utility System Effective date: 2012/10/01 End date if known: Rate name: Large General Service - 3 (Demand 1000.00 or More) Sector: Industrial Description: Source or reference: http://www.ci.weatherford.tx.us/index.aspx?nid=1150 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

407

Data:A420af13-baff-49bd-9b5f-f3b338b451ec | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:A420af13-baff-49bd-9b5f-f3b338b451ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lyntegar Electric Coop, Inc Effective date: 2010/05/01 End date if known: Rate name: Irrigation Single-Phase Service Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

408

Data:Dc5d06f3-dd89-4d36-bbe1-fd8b2a3981f7 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:Dc5d06f3-dd89-4d36-bbe1-fd8b2a3981f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: Street Lighting: 175 Watt MV - Single/Steel Sector: Lighting Description: Customer provided Facilities and Cooperative Owned and Maintained Lighting Service. Applies only to lights presently installed. All new street lighting installed shall be H.P. Sodium. As ordinary replacement of Incandescent and Mercury Vapor fixtures is required, they shall be replaced with comparable Sodium fixtures. All fixtures installed shall be subject to meeting municipal or county lighting ordinances.

409

Data:E2354274-f3a9-405e-9287-975f45e2fe74 | Open Energy Information  

Open Energy Info (EERE)

54274-f3a9-405e-9287-975f45e2fe74 54274-f3a9-405e-9287-975f45e2fe74 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Residential Service - Rg-1 Single Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The current cost per kilowatt-hour of energy billed is equal to the cost of power purchased for the most recent month, divided by the kilowatt-hours of energy sold. The monthly adjustment (rounded to the nearest one one-hundredth of a cent) is equal to the current cost less the base cost. The base cost of power (U) is $0.0790 per kilowatt-hour. Application: This rate will be applied to residential single-phase and three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Rg-1 Residential Service 3.0% of the total electric bill not to exceed $1.00

410

Data:75589199-09fe-41f3-b94d-e72c5971f523 | Open Energy Information  

Open Energy Info (EERE)

9199-09fe-41f3-b94d-e72c5971f523 9199-09fe-41f3-b94d-e72c5971f523 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Western Massachusetts Elec Co Effective date: 2013/06/01 End date if known: Rate name: Rate S-1 Street and Security Lighting-Mercury Vapor-118 watt - Basic Service Sector: Lighting Description: This rate is applicable to street, highway, and off-street lighting for "Dusk to Dawn" or the "Midnight" http://nuwnotes1.nu.com/apps/wmeco/webcontent.nsf/AR/SummaryOfElectricRates/$File/Summary%20of%20Electric%20Rates.pdf 2) LUMINAIRE CHARGE: a) Standard Street Lighting Luminaire No additional charge b) Luminaire furnished, installed and maintained by and at the expense of the customer No additional charge c) Decorative Luminaire installed after December 24, 1972: 4,000, 6,300, 8,000, 9,500, and 16,000 lumen sizes $ 3.09 27,500 and 50,000 lumen sizes $ 4.82 d) Flood Light or Spot Light Luminaire installed after December 24, 1972: 22,000, 22,500, 27,500, 36,000, 50,000, 60,000, 110,000, and 140,000 lumen sizes $ 2.63 e) Premium Decorative Luminaire Standard $ 8.06 Deluxe $11.50

411

Data:Ec466539-80fd-48fb-a098-6fa07be746f3 | Open Energy Information  

Open Energy Info (EERE)

9-80fd-48fb-a098-6fa07be746f3 9-80fd-48fb-a098-6fa07be746f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Cp-2 Large Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Maximum Measured Demand is in excess of 200 kilowatts (kW) per month for three or more months in a consecutive 12-month period. Customers that meet the application condition for the Cp-3 rate will be transferred to that rate. Customers billed on this rate shall continue to be billed on this rate until their monthly Maximum Measured Demand is less than 200 kW per month for 12 consecutive months. The utility shall offer customers billed on this rate a one-time option to continue to be billed on this rate for another 12 months if their monthly Maximum Measured Demand is less than 200 kW per month. However, this option shall be offered with the provision that the customer waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Fixed Monthly Charge includes Commitment to Community Rider: $15.00 per customer per month.

412

Data:Fee392a9-6caf-4df1-94f3-c4ab26871a3e | Open Energy Information  

Open Energy Info (EERE)

Fee392a9-6caf-4df1-94f3-c4ab26871a3e Fee392a9-6caf-4df1-94f3-c4ab26871a3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - MMRA-16 (Primary voltage) Sector: Residential Description: Applicable to electric service for the total electrical requirements of master-metered residential apartment complexes where the complex owns, operates, and maintains its own distribution system and distributes electric service to individual family apartments for domestic purposes, and other uses such as central air conditioning and heating, laundry, lighting, and water heating, where all such services are provided only for the apartment complex. Such other uses may be separated from service used within the individual apartment and served on a general service rate schedule. Service hereunder is for the exclusive use of the apartment complex, for itself and its residential tenants and is not to be used for standby, resold, except as may be furnished to its tenants, if no specific charge is made therefor, and is not available to other parties within or without the apartment complex for commercial establishments. Service hereunder shall be supplied at one point of delivery and measured through one meter. Service hereunder is subject to any of Company's rider schedules that may be applicable.

413

Data:0ac74409-f2ac-4fb5-89ca-2b93352f3c66 | Open Energy Information  

Open Energy Info (EERE)

4409-f2ac-4fb5-89ca-2b93352f3c66 4409-f2ac-4fb5-89ca-2b93352f3c66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2011/03/15 End date if known: Rate name: MU-1 - a1b - 1000 watt MV Sector: Lighting Description: Lamps in enclosed fixtures, mounted on metal or fiberglass columns and supplied from underground circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking areas, or other public places by Cities or Towns or by individuals, groups of individuals, associations and other than incorporated municipalities; and lighting of public parks, drives, bridges, parking areas or other public places by only Cities or Towns where there is a prospect that the capital expenditure is warranted. The capital expenditure will be warranted if the amount of revenue received in sixty (60) months exceeds the estimated cost of installation for the lights as calculated by the Company. If the 60-month revenue does not exceed the cost of installation, the Customer must pay two and one-half (2½) times the difference of the cost of installation and the 60-month revenue prior to installation of the lighting. The terms, prices and provisions of this rate schedule shall be applicable to a consolidated city of the first class only to the extent not inconsistent with the specifications, terms, prices and provisions in contracts which may be entered into by such city pursuant to I.C. § 36-9-9-1, et. seq.

414

Data:9e3acd47-1254-4f3f-8bc5-aaaab51bea70 | Open Energy Information  

Open Energy Info (EERE)

acd47-1254-4f3f-8bc5-aaaab51bea70 acd47-1254-4f3f-8bc5-aaaab51bea70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Cp-2 Large Power Service with Parallel Genration(20kW or less) Sector: Industrial Description: Application: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 200 kilowatts (kW) per month for three or more months in a consecutive 12-month period. Customers billed on this rate shall continue to be billed on this rate until their monthly Maximum Measured Demand is less than 200 kW per month for 12 consecutive months. The utility shall offer customers billed on this rate a one time option to continue to be billed on this rate for another 12 months if their monthly Maximum Measured Demand is less than 200 kW per month. However, this option shall be offered with the provision that the customer waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Fixed Monthly Charge includes Commitment to Community Rider: $0.20 per customer per month

415

Data:3464f875-9812-4723-81fe-8862b6a0e9f3 | Open Energy Information  

Open Energy Info (EERE)

f875-9812-4723-81fe-8862b6a0e9f3 f875-9812-4723-81fe-8862b6a0e9f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Franklin County Effective date: 2008/05/01 End date if known: Rate name: SECURITY LIGHTING SERVICE RATE SCHEDULE NO. 6 - 100 Watt HPS Sector: Lighting Description: POLE CHARGE: $200 up front when pole is requested. CONDITIONS OF SERVICE: The District will replace and maintain lamps and control equipment. The light will be installed on a District distribution pole, where space is available. If a pole is needed, the District will furnish and install a pole. BILLINGS AND TERMS OF PAYMENT. Bills will be computed at monthly or bimonthly intervals. Bills are due and payable when issued. Failure to receive a bill shall not release the purchaser from liability for payment. Bills not paid in full on or before the fifteenth day after the date of the bill are subject to an additional charge. This charge shall be one percent (1%) of unpaid amounts on monthly bills and two percent (2%) of unpaid amounts on bimonthly bills and shall be applied at subsequent billings. GENERAL TERMS AND CONDITIONS: Service under this classification is subject to the General Rules and Regulations of the District.

416

Data:C6c3ac7b-40f7-480e-8a72-f3b00edbd19c | Open Energy Information  

Open Energy Info (EERE)

c3ac7b-40f7-480e-8a72-f3b00edbd19c c3ac7b-40f7-480e-8a72-f3b00edbd19c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/15 End date if known: Rate name: Experimental Advanced Renewable Energy Purchase Service (Tier 3: Biomass/Biogas 5 MW Community-based Projects Only) Sector: Description: Effective In All territories served by the Company. Definition: Distributed generation facilities are electricity generators owned by the customer, located R close to the point of energy consumption, and small in scale, usually no more than the existing load of the customer. Availability The advanced renewable energy tariff is available to retail customers who own small distributed generation facilities that are powered by a renewable resource and placed in initial service after January 1, 2012, or who executed an advanced renewable energy contract prior to January 1, 2012. maximum size project per customer is: * Biomass/Biogas: * Tier 1: 800 kW * Tier 2: 2 MW * Tier 3 5 MW (Community-based Projects Only) Community-based Limits The Community-based Project Category is only applicable to the Biomass/Biogas and Wind technology categories and will be fully subscribed when 5 MW of capacity has been subscribed. In addition, the Community-based Category is applicable only to projects owned by local units of government (Village, City, Town or County), or to projects majority-owned by existing retail customers that choose to join together to develop a joint project. Generators rated at more than 100 kW $ 13.80/mo.

417

Data:A193f29f-3d8f-4722-b411-17e0d8406bb2 | Open Energy Information  

Open Energy Info (EERE)

3f29f-3d8f-4722-b411-17e0d8406bb2 3f29f-3d8f-4722-b411-17e0d8406bb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2011/03/15 End date if known: Rate name: MU-1 - a1c - 175 watt MV - Washington Post Std. Sector: Lighting Description: Lamps in enclosed post top type fixtures, mounted on metal or fiberglass ornamental columns and supplied from underground circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking areas, or other public places by Cities or Towns or by individuals, groups of individuals, associations and other than incorporated municipalities; and lighting of public parks, drives, bridges, parking areas or other public places by only Cities or Towns where there is a prospect that the capital expenditure is warranted. The capital expenditure will be warranted if the amount of revenue received in sixty (60) months exceeds the estimated cost of installation for the lights as calculated by the Company. If the 60-month revenue does not exceed the cost of installation, the Customer must pay two and one-half (2½) times the difference of the cost of installation and the 60-month revenue prior to installation of the lighting. The terms, prices and provisions of this rate schedule shall be applicable to a consolidated city of the first class only to the extent not inconsistent with the specifications, terms, prices and provisions in contracts which may be entered into by such city pursuant to I.C. § 36-9-9-1, et. seq.

418

Data:34e308aa-3c10-48b3-a3cf-9e25ba9e32f3 | Open Energy Information  

Open Energy Info (EERE)

08aa-3c10-48b3-a3cf-9e25ba9e32f3 08aa-3c10-48b3-a3cf-9e25ba9e32f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2011/01/01 End date if known: Rate name: Experimental Advanced Renewable Energy Purchase Service Wind Tier 1: 100 kW (at more than 200 amps) Sector: Description: Effective In All territories served by the Company. Definition: Distributed generation facilities are electricity generators owned by the customer, located R close to the point of energy consumption, and small in scale, usually no more than the existing load of the customer. Availability The advanced renewable energy tariff is available to retail customers who own small distributed generation facilities that are powered by a renewable resource and placed in initial service after January 1, 2012, or who executed an advanced renewable energy contract prior to January 1, 2012. maximum size project per customer is: Wind: * Tier 1: 100 kw * Tier 2: 2 MW * Tier 3: 5 MW (Community-based Projects) Community-based Limits The Community-based Project Category is only applicable to the Biomass/Biogas and Wind technology categories and will be fully subscribed when 5 MW of capacity has been subscribed. In addition, the Community-based Category is applicable only to projects owned by local units of government (Village, City, Town or County), or to projects majority-owned by existing retail customers that choose to join together to develop a joint project.

419

Nuclear Power 2010 Program: Combined Construction and Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all...

420

Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Construction Construction In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. Learn about the energy-efficient construction projects that are saving businesses and communities money while creating jobs.

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Construction of Channels (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

Permission is required from the Natural Resources Commission is required for the construction or alteration of artificial channels or improved channels of natural watercourses that connect to any...

422

Commercial New Construction  

Energy.gov (U.S. Department of Energy (DOE))

Efficiency Vermont offers support to encourage energy efficient design for new construction. Efficiency Vermont will provide support for new commercial buildings, including technical assistance at...

423

Pipeline Construction Guidelines (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This division of the Utility Regulatory Commission regulates the construction of any segment of an interstate pipeline on privately owned land in Indiana. The division has provisions for...

424

Construction Local engineering.  

E-Print Network (OSTI)

management processes such as cost estimating, accelerated construction, contracting, risk impacts to accurately estimate their useful service life is very important. Information gathered through this process. Constructed Facilities Division tti.tamu.edu #12;Expertise & Equipment ExpErtisE & EquipmEnt Created in 2005

425

VENTILATION NEEDS DURING CONSTRUCTION  

Science Conference Proceedings (OSTI)

The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options.

C.R. Gorrell

1998-07-23T23:59:59.000Z

426

Chapter 8: Constructing the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Constructing the Building Developing a Construction Plan Writing Effective Construction Documents Safeguarding Design Goals During Construction Protecting the Site Low-Impact Construction Processes Protecting Indoor Air Quality Managing Construction Waste LANL | Chapter 8 Constructing the Building Developing a Construction Plan A high-performance design is a great achievement, but it doesn't mean much if the building isn't then built as intended. Getting from design to a completed project happens in two stages: 1) development of construction documents and 2) actual construction. To successfully implement a sustainable design, the construction docu- ments must accurately convey the specifics that deter- mine building performance, and they have to set up

427

Constructability -- from Qinshan to the ACR  

Science Conference Proceedings (OSTI)

Atomic Energy of Canada Limited (AECL) has recognized the importance of constructability for many years, and it is applying its principals to CANDU projects with increasing success. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years. However, the last two units completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project cost and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods, which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project.

Elgohary, Medhat; Fairclough, Neville; Ricciuti, Rick

2003-09-01T23:59:59.000Z

428

Data:46ea95a1-3e8e-4d61-a403-3247f3d273c7 | Open Energy Information  

Open Energy Info (EERE)

5a1-3e8e-4d61-a403-3247f3d273c7 5a1-3e8e-4d61-a403-3247f3d273c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2010/03/30 End date if known: Rate name: HL - High Load Factor - Sub-transmission Sector: Industrial Description: AVAILABILITY: Available for power and lighting service at standard primary distribution, sub-transmission or transmission line voltages. Delivery voltage to be determined by the Company. Minimum contract two thousand (2,000) kilowatts of demand. Not for resale. CHARACTER OF SERVICE: Standard Characteristics: Three phase, sixty cycle alternating current, delivered and metered at one point on Customer's premises, at primary distribution voltage (approximately 4160 or 13,200 volts), sub-transmission voltage (approximately 34,500 volts), or transmission voltage (approximately 138,000 or 345,000 volts). All distribution transformers, lines and other equipment on the Customer's side of the point of delivery shall be installed, owned, operated and maintained by the Customer. Non-Standard Characteristics: If the Customer desires service necessitating transformers (including circuit breakers, supporting structure and supplementary equipment) which do not conform to the standards of the Company as to design, voltage ratio or capacity, or if the Customer desires the exclusive use and/or control of the transformers (whether standard or non-standard), such transformers shall be installed, owned, operated and maintained by the Customer, and the point of delivery in either case shall be at the high voltage side of the transformers. RATE: The Customer Charge; plus the sum of the Demand Charge and the Energy Charge adjusted according to the "Power Factor" clause shown hereafter; plus the Demand Side Management Adjustment, the Fuel Cost Adjustment, the Environmental Compliance Cost Recovery Adjustment and the Core and Core Plus Demand-Side Management Adjustment calculated in accordance with Rider No. 3, Rider No. 6, Rider No. 20 and Rider No. 22, respectively.

429

Data:B1a0f304-af62-41b2-aba1-5665ff7124f3 | Open Energy Information  

Open Energy Info (EERE)

4-af62-41b2-aba1-5665ff7124f3 4-af62-41b2-aba1-5665ff7124f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 8am-8pm with Parallel Generation(20 kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour. Parallel Generation (20 kW or less) Net Energy Billing - Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility. Rate: The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer's bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC). This rate will be applied to residential single-phase and three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission.

430

Data:88c43e91-ea85-477e-af02-ecc9378167f3 | Open Energy Information  

Open Energy Info (EERE)

c43e91-ea85-477e-af02-ecc9378167f3 c43e91-ea85-477e-af02-ecc9378167f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Smithfield, North Carolina (Utility Company) Effective date: 2012/09/01 End date if known: Rate name: Medium General Service Coordinated Peak Demand Single Phase Sector: Description: This Schedule is available for nonresidential electric service when the contract demand is a minimum of 50 kW but not greater than 299 kW, and facilities are installed to coordinate a minimum of 75% load reduction of power requirements on the Town's electrical system during system peak periods. The Customer must execute a Service Agreement with the Town prior to receiving service. Service will be alternating current, 60 hertz, single phase 3 wires or three phase 4 wires, at Town's standard voltages. This Schedule is available for all electric service supplied to Customer's premises at one point of delivery through one meter. Use of power for resale is not permitted. NOTE: Rate charges are database incompatible, are calculated as follows: Customer Charge: $100; KW Demand Charge: $14.00/kW Coincident Peak Demand and $4/kW Excess Demand; Energy Charge: $0.067/kWh; Determination of kW Demand Coincident Peak (CP) Demand: CP Demand shall be the average kW demand measured in the 60-minute interval used by the North Carolina Eastern Municipal Power Agency for wholesale billing purposes during the corresponding month of Customer's billing. Note - This is different from the kW Demand in the GD-1 and GD-2 rate. Excess Demand (ED): ED is the kW difference between Peak Demand and Coincident Peak Demand (see above). It is found by subtracting the Coincident Peak Demand from the Peak Demand.

431

Data:1ae862d8-c1ec-4855-a3f3-bf72950448a3 | Open Energy Information  

Open Energy Info (EERE)

ae862d8-c1ec-4855-a3f3-bf72950448a3 ae862d8-c1ec-4855-a3f3-bf72950448a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Small Power Service Optional Time-of-Day Sector: Commercial Description: Power Cost Adjustment Clause All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The current cost per kilowatt-hour of energy billed is equal to the cost of power purchased for the most recent month, divided by the kilowatt-hours of energy sold. The monthly adjustment (rounded to the nearest one one-hundredth of a cent) is equal to the current cost less the base cost. The base cost of power (U) is $0.0790 per kilowatt-hour. Application: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule. Customers billed on this rate shall continue to be billed on this rate until their monthly Maximum Measured Demand is less than 50 kW per month for 12 consecutive months. The utility shall offer customers billed on this rate a one-time option to continue to be billed on this rate for another 12 months if their monthly Maximum Measured Demand is less than 50 kW per month. However, this option shall be offered with the provision that the customer waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Commitment to Community rider: Cp-1 Small Power Service 3.0% of the total electric bill not to exceed $7.50

432

Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective  

E-Print Network (OSTI)

Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction ...

Velamati, Sri

2012-01-01T23:59:59.000Z

433

Survey of worldwide legislation on the control of construction noise  

Science Conference Proceedings (OSTI)

The sustained economic growth in many countries of the world in the past few years has led to significant increases in the construction activities for building new homes

2000-01-01T23:59:59.000Z

434

Data:95efde6b-bd2d-4fb4-a8f3-9f7d32b158fe | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:95efde6b-bd2d-4fb4-a8f3-9f7d32b158fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Oklahoma) Effective date: End date if known: Rate name: Irrigation Rate 16 (Demand Discount) Sector: Commercial Description: Rates 14, 16 and 18 for Irrigation Power Service are available in all areas served by the Cooperative. Irrigation Power Service is applicable to accounts where Member is using an electric motor to lift ground water for the purpose of irrigation. A $3.50 per kilowatt demand discount is available during On-Peak months for volunteering to refrain from operating irrigation equipment during the hours of 10:00 am through 10:00 pm each day of the On-Peak season. Under this rate irrigation shall only be allowed during the hours of 10:00 pm and 10:00 am.

435

Passive solar construction handbook  

DOE Green Energy (OSTI)

Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

Levy, E.; Evans, D.; Gardstein, C.

1981-08-01T23:59:59.000Z

436

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE))

The authorization to proceed with construction of a new facility is given at the CD-3 phase of the project management cycle, after completion of the final design. Between CD-3 and CD-4 stages of...

437

Spider Web Construction  

NLE Websites -- All DOE Office Websites (Extended Search)

Spider Web Construction Name: Stephanie Location: NA Country: NA Date: NA Question: Near our home on Lake Ontario, we often find spider websm that have a horizontal line at the...

438

Photon Sciences | Construction Cameras  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS-II Construction Cameras You may click either the links or the camera icons shown below to access each webcam. Note: It may take 5-20 seconds to load the webcam console. Live...

439

Automatic thesaurus construction  

Science Conference Proceedings (OSTI)

In this paper we introduce a novel method of automating thesauri using syntactically constrained distributional similarity. With respect to syntactically conditioned cooccurrences, most popular approaches to automatic thesaurus construction simply ignore ... Keywords: distribution, similarity, syntactic dependency

Dongqiang Yang; David M. Powers

2008-01-01T23:59:59.000Z

440

Hackney Construction | Open Energy Information  

Open Energy Info (EERE)

Hackney Construction Hackney Construction Jump to: navigation, search Name Hackney Construction Address 309 Farrens Creek Lane/PO Box 13 Place Grangeville, Idaho Zip 83530 Sector Solar Product Green Building, renewable energy Year founded 1991 Number of employees 1-10 Phone number 208-983-3109 Website http://DigitalProductsAndRenew Coordinates 45.926552°, -116.1223654° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.926552,"lon":-116.1223654,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "f3 year construction" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Recovery Act Supports Construction of Site's Largest Groundwater Treatment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supports Construction of Site's Largest Groundwater Supports Construction of Site's Largest Groundwater Treatment Facility Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility Construction of the largest groundwater treatment facility at the Hanford Site – a major American Recovery and Reinvestment Act project – is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish construction of the 200 West Groundwater Treatment Facility this year. Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility More Documents & Publications Hanford Treats Record Amount of Groundwater Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives,

442

Energy Efficient Residential Construction Tax Credit (Personal) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Personal) Personal) Energy Efficient Residential Construction Tax Credit (Personal) < Back Eligibility Construction Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heating Heat Pumps Insulation Maximum Rebate 4,000 Program Info Start Date 11/01/2005 State Oklahoma Program Type Personal Tax Credit Rebate Amount Amount of eligible expenditures Provider Oklahoma Department of Commerce '''''Note: After a 2 year moratorium on all state tax credits, this credit may be claimed for tax year 2012 and subsequent tax years, for eligible expenditures on or after July 1, 2012.''''' Oklahoma allows a contractor who is the primary builder of an energy

443

Weatherford Inclined Wellbore Construction  

SciTech Connect

The Rocky Mountain Oilfield Testing Center (RMOTC) has recently completed construction of an inclined wellbore with seven (7) inch, twenty-three (23) pound casing at a total depth of 1296 feet. The inclined wellbore is near vertical to 180 feet with a build angle of approximately 4.5 degrees per hundred feet thereafter. The inclined wellbore was utilized for further proprietary testing after construction and validation. The wellbore is available to other companies requiring a cased hole environment with known deviation out to fifty degrees (50) from vertical. The wellbore may also be used by RMOTC for further deepening into the fractured shales of the Steele and Niobrara formation.

Schulte, R.

2002-08-19T23:59:59.000Z

444

Segmentally Constructed Prestressed Concrete  

E-Print Network (OSTI)

Segmentally Constructed Prestressed Concrete Hyperboloid Cooling Tower Saml H. Rizkalla Assistant large capacity power plant facilities, the natural draft cooling tower in the fonn of a thin shell concrete natural draft cooling towers is expensive and time-consuming. The cost of the structure

445

Martifer Construction | Open Energy Information  

Open Energy Info (EERE)

Martifer Group that deals in construction services. The division operates in wind farm tower construction, also provides engineering services for solar projects. References...

446

Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Schedule Current Projects APCF 27-ID and 35-ID LOM438 Pentagon F LOM437 Protocol for halting construction because of vibrations 0614...

447

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

448

HAPO Plant acquisition and construction budget for FY 1966 and revision of budget for FY 1965  

SciTech Connect

This report provides the Hanford Atomic Products Operation plant acquisition and construction budget for fiscal year 1966 and the revision of budget for fiscal year 1965.

Connell, R.A.

1964-04-28T23:59:59.000Z

449

Philadelphia Gas Works - Residential and Commercial Construction Incentives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Gas Works - Residential and Commercial Construction Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) < Back Eligibility Commercial Industrial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Maximum Rebate Residential: $750 Commercial: $60,000 Program Info Start Date 9/1/2012 Expiration Date 8/31/2015 State Pennsylvania Program Type Utility Rebate Program Rebate Amount '''Residential''' Residential Construction: $750 '''Commercial/Industrial''' 10% to 20% to 30% above code, $40/MMBtu first-year savings Philadelphia Gas Works (PGW) provides incentives to developers, home

450