National Library of Energy BETA

Sample records for drilling techniques development

  1. Downhole drilling network using burst modulation techniques

    DOE Patents [OSTI]

    Hall; David R. (Provo, UT), Fox; Joe (Spanish Fork, UT)

    2007-04-03

    A downhole drilling system is disclosed in one aspect of the present invention as including a drill string and a transmission line integrated into the drill string. Multiple network nodes are installed at selected intervals along the drill string and are adapted to communicate with one another through the transmission line. In order to efficiently allocate the available bandwidth, the network nodes are configured to use any of numerous burst modulation techniques to transmit data.

  2. Drilling Techniques | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EA Jump to:of the National ClimateDongying ShengdongCorningDrilling

  3. Managed pressure drilling techniques and tools 

    E-Print Network [OSTI]

    Martin, Matthew Daniel

    2006-08-16

    The economics of drilling offshore wells is important as we drill more wells in deeper water. Drilling-related problems, including stuck pipe, lost circulation, and excessive mud cost, show the need for better drilling technology. If we can solve...

  4. Technology Development and Field Trials of EGS Drilling Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Development and Field Trials of EGS Drilling Systems Technology Development and Field Trials of EGS Drilling Systems Technology Development and Field Trials of EGS...

  5. Instruments and Methods New technique for access-borehole drilling in shelf glaciers using

    E-Print Network [OSTI]

    Holland, David

    the glacier into the sea water beneath. The new drilling technique does not require drilling fluid; (2) fluid borehole drilling, i.e. borehole completely or partially filled with non-freezing liquid; and (3) semi-fluid drilling, which is a combination of dry and fluid drilling techniques. Fluid drilling

  6. Technology Development and Field Trials of EGS Drilling Systems...

    Open Energy Info (EERE)

    Technology Development and Field Trials of EGS Drilling Systems: PDC Bits Outperform Conventional Bit in Geothermal Drilling Project, Geothermal Resources Council 2012...

  7. Development of a Hydrothermal Spallation Drilling System for...

    Open Energy Info (EERE)

    Spallation Drilling System for EGS Project Type Topic 1 Recovery Act: Enhanced Geothermal Systems Component Research and DevelopmentAnalysis Project Type Topic 2 Drilling...

  8. Category:Drilling Techniques | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,Cammack Village,8199089°,AnalyticalCuttings AnalysisDownhole FluidDrilling

  9. ENGINEERING APPLICATIONS OF THE HIGHRESOLUTION SEISMIC TECHNIQUES: TUNNEL DRILLING

    E-Print Network [OSTI]

    Politècnica de Catalunya, Universitat

    tomography were used for tunnel design in two different areas. Two seismic data acquisition experimentsENGINEERING APPLICATIONS OF THE HIGHRESOLUTION SEISMIC TECHNIQUES: TUNNEL DRILLING Álvarez. Tel. +34 93 409.54.10 Fax. +34 93 411.00.12 Email: rcarbo@ija.csic.es Seismic methologies has been

  10. UNIVERSITY OF CALGARY New Measurement-While-Drilling Surveying Technique Utilizing Sets of

    E-Print Network [OSTI]

    Calgary, University of

    techniques eliminate the costly non- magnetic drill collars in which the presently used magnetometersUNIVERSITY OF CALGARY New Measurement-While-Drilling Surveying Technique Utilizing Sets of Fiber ABSTRACT Horizontal drilling processes in the oil industry utilize directional measurement- while-drilling

  11. Development of a High-Temperature Diagnostics-While-Drilling...

    Office of Environmental Management (EM)

    Development of a High-Temperature Diagnostics-While-Drilling Tool Development of a High-Temperature Diagnostics-While-Drilling Tool This report documents work performed in the...

  12. Technology Development and Field Trials of EGS Drilling Systems

    Broader source: Energy.gov [DOE]

    Project objective: Development of drilling systems based upon rock penetration technologies not commonly employed in the geothermal industry.

  13. Development of a Mine Rescue Drilling System (MRDS) :

    SciTech Connect (OSTI)

    Raymond, David W.; Gaither, Katherine N.; Polsky, Yarom; Knudsen, Steven D.; Broome, Scott Thomas; Su, Jiann-Cherng; Blankenship, Douglas A.; Costin, Laurence S.

    2014-06-01

    Sandia National Laboratories (Sandia) has a long history in developing compact, mobile, very high-speed drilling systems and this technology could be applied to increasing the rate at which boreholes are drilled during a mine accident response. The present study reviews current technical approaches, primarily based on technology developed under other programs, analyzes mine rescue specific requirements to develop a conceptual mine rescue drilling approach, and finally, proposes development of a phased mine rescue drilling system (MRDS) that accomplishes (1) development of rapid drilling MRDS equipment; (2) structuring improved web communication through the Mine Safety & Health Administration (MSHA) web site; (3) development of an improved protocol for employment of existing drilling technology in emergencies; (4) deployment of advanced technologies to complement mine rescue drilling operations during emergency events; and (5) preliminary discussion of potential future technology development of specialized MRDS equipment. This phased approach allows for rapid fielding of a basic system for improved rescue drilling, with the ability to improve the system over time at a reasonable cost.

  14. Development and Manufacture of Cost-Effective Composite Drill Pipe

    SciTech Connect (OSTI)

    James C. Leslie

    2008-12-31

    Advanced Composite Products and Technology, Inc. (ACPT) has developed composite drill pipe (CDP) that matches the structural and strength properties of steel drill pipe, but weighs less than 50 percent of its steel counterpart. Funding for the multiyear research and development of CDP was provided by the U.S. Department of Energy Office of Fossil Energy through the Natural Gas and Oil Projects Management Division at the National Energy Technology Laboratory (NETL). Composite materials made of carbon fibers and epoxy resin offer mechanical properties comparable to steel at less than half the weight. Composite drill pipe consists of a composite material tube with standard drill pipe steel box and pin connections. Unlike metal drill pipe, composite drill pipe can be easily designed, ordered, and produced to meet specific requirements for specific applications. Because it uses standard joint connectors, CDP can be used in lieu of any part of or for the entire steel drill pipe section. For low curvature extended reach, deep directional drilling, or ultra deep onshore or offshore drilling, the increased strength to weight ratio of CDP will increase the limits in all three drilling applications. Deceased weight will reduce hauling costs and increase the amount of drill pipe allowed on offshore platforms. In extreme extended reach areas and high-angle directional drilling, drilling limits are associated with both high angle (fatigue) and frictional effects resulting from the combination of high angle curvature and/or total weight. The radius of curvature for a hole as small as 40 feet (12.2 meters) or a build rate of 140 degrees per 100 feet is within the fatigue limits of specially designed CDP. Other properties that can be incorporated into the design and manufacture of composite drill pipe and make it attractive for specific applications are corrosion resistance, non-magnetic intervals, and abrasion resistance coatings. Since CDP has little or no electromagnetic force fields up to 74 kilohertz (KHz), a removable section of copper wire can be placed inside the composite pipe to short the tool joints electrically allowing electromagnetic signals inside the collar to induce and measure the same within the rock formation. By embedding a pair of wires in the composite section and using standard drill pipe box and pin ends equipped with a specially developed direct contact joint electrical interface, power can be supplied to measurement-while-drilling (MWD) and logging-while-drilling (LWD) bottom hole assemblies. Instantaneous high-speed data communications between near drill bit and the surface are obtainable utilizing this 'smart' drilling technology. The composite drill pipe developed by ACPT has been field tested successfully in several wells nationally and internationally. These tests were primarily for short radius and ultra short radius directional drilling. The CDP in most cases performed flawlessly with little or no appreciable wear. ACPT is currently marketing a complete line of composite drill collars, subs, isolators, casing, and drill pipe to meet the drilling industry's needs and tailored to replace metal for specific application requirements.

  15. Batch drilling program cuts time, costs for Liuhua development

    SciTech Connect (OSTI)

    Gray, G.E.; Hall, K.H.; Mu, H.C.

    1996-08-12

    The efficiency of batch drilling operations and the appropriate use of technology, teamwork, and thorough planning helped cut several days off the time to drill each of 10 subsea wells for the Liuhua 11-1 development project in the South China Sea. The overall development program calls for drilling and completing 20 subsea horizontal wells. The rig-of-opportunity phase was the initial phase of this development and used a contract rig to establish the subsea wellhead array and initiate drilling of the development wells. The wellhead array was the first critical step. It was the foundation for the building block construction process used to create Liuhua`s subsea production system on the seabed. The paper discusses conductor operations, batch drilling operations, surface hole section, intermediate and production hole sections, the ten wells, application of technology, and overall results.

  16. Development and Manufacture of Cost Effective Composite Drill Pipe

    SciTech Connect (OSTI)

    James C. Leslie; James C. Leslie, II; Lee Truong; James T. Heard

    2006-09-29

    This technical report presents the engineering research, process development and data accomplishments that have transpired to date in support of the development of Cost Effective Composite Drill Pipe (CDP). The report presents progress made from October 1, 2005 through September 30, 2006 and contains the following discussions: Qualification Testing; Prototype Development and Testing of ''Smart Design'' Configuration; Field Test Demonstration; Development of Ultra-Short Radius Composite Drill Pipe (USR-CDP); and Development of Smart USR-CDP.

  17. Development of a micro-drilling burr-control chart for PCB drilling

    E-Print Network [OSTI]

    2014-01-01

    single- or double-sided). Drilling provides the holes forstandard conditions. Fig. 4. Drilling experimental setup.a standard procedure in PCB drilling). These were clamped

  18. Techniques Employed to Conduct Postshot Drilling at the former Nevada Test Site

    SciTech Connect (OSTI)

    Dekin, W D

    2011-04-14

    Postshot drilling provided essential data on the results of the underground nuclear tests conducted at the Nevada Test Site (NTS), now identified as the Nevada National Security Site (NNSS). It was the means by which samples from the zone of interest were obtained for radiochemical analysis. This handbook describes how Lawrence Livermore National Laboratory (LLNL) conducted postshot drilling operations at the NTS, and it provides a general understanding of the process. Postshot drilling is a specialized application of rotary drilling. Accordingly, this handbook gives a brief description of rotary drilling in Section 2 to acquaint the reader with the general subject before proceeding to the specialized techniques used in postshot drilling. In Section 3, the handbook describes the typical postshot drilling situation at the former NTS and the drilling methods used. Section 4 describes the typical sequence of operations in postshot drilling at the former NTS. Detailed information on special equipment and techniques is given in a series of appendices (A through F) at the end of the handbook.

  19. An Industry/DOE Program to Develop and Benchmark Advanced Diamond Product Drill Bits and HP/HT Drilling Fluids to Significantly Improve Rates of Penetration

    SciTech Connect (OSTI)

    TerraTek

    2007-06-30

    A deep drilling research program titled 'An Industry/DOE Program to Develop and Benchmark Advanced Diamond Product Drill Bits and HP/HT Drilling Fluids to Significantly Improve Rates of Penetration' was conducted at TerraTek's Drilling and Completions Laboratory. Drilling tests were run to simulate deep drilling by using high bore pressures and high confining and overburden stresses. The purpose of this testing was to gain insight into practices that would improve rates of penetration and mechanical specific energy while drilling under high pressure conditions. Thirty-seven test series were run utilizing a variety of drilling parameters which allowed analysis of the performance of drill bits and drilling fluids. Five different drill bit types or styles were tested: four-bladed polycrystalline diamond compact (PDC), 7-bladed PDC in regular and long profile, roller-cone, and impregnated. There were three different rock types used to simulate deep formations: Mancos shale, Carthage marble, and Crab Orchard sandstone. The testing also analyzed various drilling fluids and the extent to which they improved drilling. The PDC drill bits provided the best performance overall. The impregnated and tungsten carbide insert roller-cone drill bits performed poorly under the conditions chosen. The cesium formate drilling fluid outperformed all other drilling muds when drilling in the Carthage marble and Mancos shale with PDC drill bits. The oil base drilling fluid with manganese tetroxide weighting material provided the best performance when drilling the Crab Orchard sandstone.

  20. Using Bayesian Network to Develop Drilling Expert Systems 

    E-Print Network [OSTI]

    Alyami, Abdullah

    2012-10-19

    engineers or as a consultation system in various drilling engineering concepts such as drilling fluids, cementing, completion, well control, and underbalanced drilling practices. This method is done by proposing a set of guidelines for the optimal drilling...

  1. Development of a system to provide diagnostics-while-drilling.

    SciTech Connect (OSTI)

    Wise, Jack LeRoy; Jacobson, Ronald David; Finger, John Travis; Mansure, Arthur James; Knudsen, Steven Dell

    2003-06-01

    This report describes development of a system that provides high-speed, real-time downhole data while drilling. Background of the project, its benefits, major technical challenges, test planning, and test results are covered by relatively brief descriptions in the body of the report, with some topics presented in more detail in the attached appendices.

  2. Geothermal drilling and completion technology development program. Annual progress report, October 1979-September 1980

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-11-01

    The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

  3. Category:Development Drilling | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County,Camilla, Georgia: Energy014771°,NorthCLEAN WebinarNH JumpDevelopment

  4. DEVELOPMENT AND MANUFACTURE OF COST EFFECTIVE COMPOSITE DRILL PIPE

    SciTech Connect (OSTI)

    Dr. James C. Leslie; Mr. Jeffrey R. Jean; Hans Neubert; Lee Truong

    2000-10-30

    This annual, technical report will discuss the engineering research and data accomplishments that have transpired in support of the development of Cost Effective Composite Drill Pipe (CDP). The report discusses and illustrates the first iteration design of the tube and the tool joint interface. The report discusses standards and specifications to which the CDP design will be tailored and tested, and discusses conclusions of the first iteration design for future design enhancements.

  5. Automated Drill Modeling for Drilling Process Simulation

    E-Print Network [OSTI]

    Vijayaraghavan, Athulan; Dornfeld, David

    2006-01-01

    Development of Comprehensive Drilling Simulation Tool”. ThisLayer Gap Formation in Drilling of a Multilayered Material”,Vijayaraghavan, A. (2005), “Drilling of Fiber- Reinforced

  6. DEVELOPMENT AND MANUFACTURE OF COST EFFECTIVE COMPOSITE DRILL PIPE

    SciTech Connect (OSTI)

    James C. Leslie; James C. Leslie II; Lee Truong; James T. Heard; Peter Manekas

    2005-03-18

    This technical report presents the engineering research, process development and data accomplishments that have transpired to date in support of the development of Cost Effective Composite Drill Pipe (CDP). The report presents progress made from October 1, 2003 through September 30, 2004 and contains the following discussions: (1) Direct Electrical Connection for Rotary Shoulder Tool Joints; (2) Conductors for inclusion in the pipe wall (ER/DW-CDP); (3) Qualify fibers from Zoltek; (4) Qualify resin from Bakelite; (5) First commercial order for SR-CDP from Integrated Directional Resources (SR-CDP); and (6) Preparation of papers for publication and conference presentations.

  7. Recent Developments in Geothermal Drilling Fluids Kelsey, J....

    Office of Scientific and Technical Information (OSTI)

    M. J.; Clements, W. R.; Hilscher, L. W.; Remont, L. J.; Matula, G. W.; Balley, D. N. 01 COAL, LIGNITE, AND PEAT; 15 GEOTHERMAL ENERGY; BENTONITE; BROWN COAL; DRILLING; DRILLING...

  8. Development plan for an advanced drilling system with real-time diagnostics (Diagnostics-While-Drilling)

    SciTech Connect (OSTI)

    FINGER,JOHN T.; MANSURE,ARTHUR J.; PRAIRIE,MICHAEL R.; GLOWKA,D.A.

    2000-02-01

    This proposal provides the rationale for an advanced system called Diagnostics-while-drilling (DWD) and describes its benefits, preliminary configuration, and essential characteristics. The central concept is a closed data circuit in which downhole sensors collect information and send it to the surface via a high-speed data link, where it is combined with surface measurements and processed through drilling advisory software. The driller then uses this information to adjust the drilling process, sending control signals back downhole with real-time knowledge of their effects on performance. The report presents background of related previous work, and defines a Program Plan for US Department of Energy (DOE), university, and industry cooperation.

  9. Technology Development and Field Trials of EGS Drilling Systems at Chocolate Mountain

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Steven Knudsen

    2012-01-01

    Polycrystalline diamond compact (PDC) bits are routinely used in the oil and gas industry for drilling medium to hard rock but have not been adopted for geothermal drilling, largely due to past reliability issues and higher purchase costs. The Sandia Geothermal Research Department has recently completed a field demonstration of the applicability of advanced synthetic diamond drill bits for production geothermal drilling. Two commercially-available PDC bits were tested in a geothermal drilling program in the Chocolate Mountains in Southern California. These bits drilled the granitic formations with significantly better Rate of Penetration (ROP) and bit life than the roller cone bit they are compared with. Drilling records and bit performance data along with associated drilling cost savings are presented herein. The drilling trials have demonstrated PDC bit drilling technology has matured for applicability and improvements to geothermal drilling. This will be especially beneficial for development of Enhanced Geothermal Systems whereby resources can be accessed anywhere within the continental US by drilling to deep, hot resources in hard, basement rock formations.

  10. Development of a Hydrothermal Spallation Drilling System for EGS

    Broader source: Energy.gov [DOE]

    Project objective: Build and demonstrate a working prototype hydrothermal spallation drilling unit that will accelerate commercial deployment of EGS as a domestic energy resource.

  11. Optimization of Deep Drilling Performance - Development and Benchmark Testing of Advanced Diamond Product Drill Bits & HP/HT Fluids to Significantly Improve Rates of Penetration

    SciTech Connect (OSTI)

    Alan Black; Arnis Judzis

    2005-09-30

    This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2004 through September 2005. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for a next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all Phase 1 testing and is planning Phase 2 development.

  12. Development of a Low-Cost Rotary Steerable Drilling System

    SciTech Connect (OSTI)

    Roney Nazarian

    2012-01-31

    The project had the goal to develop and commercialize a low-cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures to reduce operating costs by a minimum of 50% and lost-in-hole charges by at least 50% over the currently offered systems. The LCRSS system developed under this project does reduce operating costs by 55% and lost-in-hole charges by at least 50%. The developed product is not commercializable in its current form. The overall objective was to develop and commercialize a low cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures (20,000 psi/150 C) while reducing the operating costs by 50% and the lost-in-hole charges by 50% over the currently available systems. The proposed reduction in costs were to be realized through the significant reduction in tool complexity, a corresponding increase in tool reliability as expressed in the mean-time between failure (MTBF), and a reduction in the time and costs required to service tools after each field operation. Ultimately, the LCRSS system was to be capable of drilling 7 7/8 in. to 9 5/8 in. borehole diameters. The project was divided into three Phases, of which Phases I & II were previously completed and reported on, and are part of the case file. Therefore, the previously reported information is not repeated herein. Phase III included the fabrication of two field ready prototypes that were to be subjected to a series of drilling tests at GTI Catoosa, DOE RMOTC, and at customer partnering wells, if possible, as appropriate in the timing of the field test objectives to fully exercise all elements of the LCRSS. These tests were conducted in an iterative process based on a performance/reliability improvement cycle with the goal of demonstrating the system met all aspects required for commercial viability. These tests were conducted to achieve continuous runs of 100+ hours with well trajectories that fully exercised the tool's build/turn/drop/hold target capabilities and its higher end ratings for bit weight, torque and rotary speed. The tool teardowns were rigorously analyzed at the conclusion of each field run to assess component wear rates and to fully document any detrimental behavior(s) observed.

  13. Technology Development and Field Trials of EGS Drilling Systems...

    Open Energy Info (EERE)

    rock formations. Data and Resources sandia et al-grc2012-final.pdfPDF PDC Bits Outperform Conventional Bit in Geothermal Drilling Project, GRC... Preview Go to resource chocolate...

  14. Coiled-tubing drilling

    SciTech Connect (OSTI)

    Leising, L.J.; Newman, K.R.

    1993-12-01

    For several years, CT has been used to drill scale and cement in cased wells. Recently, CT has been used (in place of a rotary drilling rig) to drill vertical and horizontal open holes. At this time, < 30 openhole CT drilling (CTD) jobs have been performed. However, there is a tremendous interest in this technique in the oil industry; many companies are actively involved in developing CTD technology. This paper discusses CTD applications and presents an engineering analysis of CTD. This analysis attempts to define the limits of what can and cannot be done with CTD. These limits are calculated with CT and drilling models used for other applications. The basic limits associated with CTD are weight and size, CT force and life, and hydraulic limits. Each limit is discussed separately. For a specific application, each limit must be considered.

  15. Workshop to develop deep-life continental scientific drilling projects

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kieft, T. L.; Onstott, T. C.; Ahonen, L.; Aloisi, V.; Colwell, F. S.; Engelen, B.; Fendrihan, S.; Gaidos, E.; Harms, U.; Head, I.; et al

    2015-05-29

    The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have includedmore »a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP-sponsored drilling workshops in 2016.« less

  16. Workshop to develop deep-life continental scientific drilling projects

    SciTech Connect (OSTI)

    Kieft, T. L.; Onstott, T. C.; Ahonen, L.; Aloisi, V.; Colwell, F. S.; Engelen, B.; Fendrihan, S.; Gaidos, E.; Harms, U.; Head, I.; Kallmeyer, J.; Kiel Reese, B.; Lin, L.-H.; Long, P. E.; Moser, D. P.; Mills, H.; Sar, P.; Schulze-Makuch, D.; Stan-Lotter, H.; Wagner, D.; Wang, P.-L.; Westall, F.; Wilkins, M. J.

    2015-05-29

    The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have included a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP-sponsored drilling workshops in 2016.

  17. OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS & HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION

    SciTech Connect (OSTI)

    Alan Black; Arnis Judzis

    2004-10-01

    The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for a next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit-fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all major preparations for the high pressure drilling campaign. Baker Hughes encountered difficulties in providing additional pumping capacity before TerraTek's scheduled relocation to another facility, thus the program was delayed further to accommodate the full testing program.

  18. Optimization of Deep Drilling Performance--Development and Benchmark Testing of Advanced Diamond Product Drill Bits & HP/HT Fluids to Significantly Improve Rates of Penetration

    SciTech Connect (OSTI)

    Alan Black; Arnis Judzis

    2003-10-01

    This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2002 through September 2002. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for a next level of deep drilling performance; Phase 2--Develop advanced smart bit--fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. Accomplishments to date include the following: 4Q 2002--Project started; Industry Team was assembled; Kick-off meeting was held at DOE Morgantown; 1Q 2003--Engineering meeting was held at Hughes Christensen, The Woodlands Texas to prepare preliminary plans for development and testing and review equipment needs; Operators started sending information regarding their needs for deep drilling challenges and priorities for large-scale testing experimental matrix; Aramco joined the Industry Team as DEA 148 objectives paralleled the DOE project; 2Q 2003--Engineering and planning for high pressure drilling at TerraTek commenced; 3Q 2003--Continuation of engineering and design work for high pressure drilling at TerraTek; Baker Hughes INTEQ drilling Fluids and Hughes Christensen commence planning for Phase 1 testing--recommendations for bits and fluids.

  19. WETTABILITY AND PREDICTION OF OIL RECOVERY FROM RESERVOIRS DEVELOPED WITH MODERN DRILLING AND COMPLETION FLUIDS

    SciTech Connect (OSTI)

    Jill S. Buckley; Norman R. Morrow

    2006-01-01

    The objectives of this project are: (1) to improve understanding of the wettability alteration of mixed-wet rocks that results from contact with the components of synthetic oil-based drilling and completion fluids formulated to meet the needs of arctic drilling; (2) to investigate cleaning methods to reverse the wettability alteration of mixed-wet cores caused by contact with these SBM components; and (3) to develop new approaches to restoration of wetting that will permit the use of cores drilled with SBM formulations for valid studies of reservoir properties.

  20. Drilling equipment to shrink

    SciTech Connect (OSTI)

    Silverman, S.

    2000-01-01

    Drilling systems under development will take significant costs out of the well construction process. From small coiled tubing (CT) drilling rigs for North Sea wells to microrigs for exploration wells in ultra-deepwater, development projects under way will radically cut the cost of exploratory holes. The paper describes an inexpensive offshore system, reeled systems drilling vessel, subsea drilling rig, cheap exploration drilling, laser drilling project, and high-pressure water jets.

  1. New Techniques to Characterize and Remove Water-Based Drilling Fluids Filter Cake 

    E-Print Network [OSTI]

    Elkatatny, Salaheldin Mahmoud

    2013-03-29

    Filter cake characterization is very important in drilling and completion operations. Heterogeneity of the filter cake plays a key role in the design of chemical treatments needed to remove the filter cake. The objectives of this study...

  2. 28. annual offshore technology conference: Proceedings. Volume 4: Field drilling and development systems

    SciTech Connect (OSTI)

    1996-12-31

    The 88 papers in this volume cover the following topics: Small operator implementation of subsea technology; Control system umbilicals, components and ROV interfacing; DeepStar--Results and plans; Deepwater subsea manifold systems; Drilling technology; Limit state design criteria for pipelines; Liuhua project; Mobile offshore drilling units; Offshore coiled tubing operations; Oman-India gas pipeline; Paraffin and hydrate control; Pompano--A deepwater subsea development; Severe operating conditions; Subsea production systems; and Well completions technology. Papers have been processed separately for inclusion on the data base.

  3. David Alciatore ("Dr. Dave") ILLUSTRATED PRINCIPLES "Draw Shot Primer Part VI: Draw Shot Practice Drill"

    E-Print Network [OSTI]

    Alciatore, David G.

    Drill" Note: Supporting narrated video (NV) demonstrations, high-speed video (HSV) clips, and technical practices" for good draw technique. In this article, we will look at a practice drill that might help you further develop and improve your draw shot technique. Diagram 1 shows a drill you might find useful ... I

  4. Managed Pressure Drilling Candidate Selection 

    E-Print Network [OSTI]

    Nauduri, Anantha S.

    2010-07-14

    Managed Pressure Drilling now at the pinnacle of the 'Oil Well Drilling' evolution tree, has itself been coined in 2003. It is an umbrella term for a few new drilling techniques and some preexisting drilling techniques, all of them aiming to solve...

  5. Development of advanced drilling, completion, and stimulation systems for minimum formation damage and improved efficiency: A program overview

    SciTech Connect (OSTI)

    Layne, A.W.; Yost, A.B. II

    1994-07-01

    The Department of Energy`s (DOE) Natural Gas Resource and Extraction Program consists of industry/government co-sponsored research, development, and demonstration (RD&D) projects, which focus on gas recovery from both conventional and nonconventional resources. The Drilling, Completion, and Stimulation (DCS) Project focuses on advanced, non-damaging technology systems and equipment for improving gas recovery from conventional and nonconventional reservoirs. As operators move from development of current day economically attractive gas-field development to the lower permeability geologic regions of domestic onshore plays, increasing the emphasis on minimum formation damage DCS will permit economic development of gas reserves. The objective of the Project is to develop and demonstrate cost-effective, advanced technology to accelerate widespread use and acceptance of minimum formation damage DCS systems. The goal of this product development effort is to reduce costs and improve the overall efficiency of vertical, directional, and horizontally drilled wells in gas formations throughout the US. The current focus of the Project is on the development of underbalanced drilling technology and minimum formation damage stimulation technology concurrently with the appropriate completion hardware to improve the economics of domestic natural gas field development. Ongoing drilling technology projects to be discussed include development of an electromagnetic measurement while drilling system for directional and horizontal drilling in underbalanced drilling applications and the development of a steerable air percussion drilling system for hard formation drilling and improved penetration rates. Ongoing stimulation technology projects to be discussed include introduction of carbon dioxide/sand fracturing technology for minimal formation damage.

  6. Development of a model to calculate mechanical specific energy for air hammer drilling systems 

    E-Print Network [OSTI]

    Okuchaba, Boma Jeremiah

    2009-05-15

    drilling time could be reduced. Real-time monitoring of Mechanical Specific Energy will enable drilling engineers to detect when the optimum drilling rate for a given set of drilling parameters is not being achieved. Numerous works have been done on air...

  7. DEVELOPMENT OF GLASS AND GLASS CERAMIC PROPPANTS FROM GAS SHALE WELL DRILL CUTTINGS

    SciTech Connect (OSTI)

    Johnson, F.; Fox, K.

    2013-10-02

    The objective of this study was to develop a method of converting drill cuttings from gas shale wells into high strength proppants via flame spheroidization and devitrification processing. Conversion of drill cuttings to spherical particles was only possible for small particle sizes (< 53 {micro}m) using a flame former after a homogenizing melting step. This size limitation is likely to be impractical for application as conventional proppants due to particle packing characteristics. In an attempt to overcome the particle size limitation, sodium and calcium were added to the drill cuttings to act as fluxes during the spheroidization process. However, the flame former remained unable to form spheres from the fluxed material at the relatively large diameters (0.5 - 2 mm) targeted for proppants. For future work, the flame former could be modified to operate at higher temperature or longer residence time in order to produce larger, spherical materials. Post spheroidization heat treatments should be investigated to tailor the final phase assemblage for high strength and sufficient chemical durability.

  8. North America: A better second half for drilling--Maybe. [Oil and gas exploration and development in North America

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This paper provides data on the exploration, production, and drilling activity of the oil and gas industry in Canada, the US, and Central America. The section on the US discusses trends in drilling activity in both the first and second half of 1993. Statistical information on all oil and gas producing states if provided in a tabular format. Information on exploration and development expenditures is also discussed. Data is also provided drilling and production information for Canada, Mexico, Guatemala, Belize, Nicaragua, and other minor production areas.

  9. WETTABILITY AND PREDICTION OF OIL RECOVERY FROM RESERVOIRS DEVELOPED WITH MODERN DRILLING AND COMPLETION FLUIDS

    SciTech Connect (OSTI)

    Jill S. Buckley; Norman R. Morrow

    2004-11-01

    Contamination of crude oils by surface-active agents from drilling fluids or other oil-field chemicals is more difficult to detect and quantify than bulk contamination with, for example, base fluids from oil-based muds. Bulk contamination can be detected by gas chromatography or other common analytical techniques, but surface-active contaminants can be influential at much lower concentrations that are more difficult to detect analytically, especially in the context of a mixture as complex as a crude oil. In this report we present a baseline study of interfacial tensions of 39 well-characterized crude oil samples with aqueous phases that vary in pH and ionic composition. This extensive study will provide the basis for assessing the effects of surface-active contaminant on interfacial tension and other surface properties of crude oil/brine/rock ensembles.

  10. WETTABILITY AND PREDICTION OF OIL RECOVERY FROM RESERVOIRS DEVELOPED WITH MODERN DRILLING AND COMPLETION FLUIDS

    SciTech Connect (OSTI)

    Jill S. Buckley; Norman R. Morrow

    2002-12-01

    We report on a preliminary study of wetting effects of synthetic oil-based mud components on the wetting of mica surfaces using drilling mud fractions obtained from two wells drilled with synthetic oil-based muds (SBM). We have used these SBM fractions, one a filtrate and the other a centrifugate, to develop testing protocols for studies on smooth mica surfaces. Both SBM fractions changed the wetting of clean, dry mica surfaces, making them preferentially oil-wet. Solvents were tested to clean the mica with varying degrees of success. In tests designed to simulate contact between SBM fractions and reservoir pore surface, changes of wetting of mica that had previously been exposed to brine and crude oil were examined using six different crude oils in combination with several different brine formulations. Four of the six oils produced preferentially water-wet surfaces whereas two produced fairly oil-wet conditions on mica. Exposure to the SBM fractions tended to increase decane/water advancing contact angles on the more water-wet surfaces and to decrease those on the more oil-wet surfaces. Cleaning solvents were compared for their efficacy and the possibility of wettability restoration was examined for some of the cleaned surfaces.

  11. COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES

    E-Print Network [OSTI]

    Lamb, D.W.

    2013-01-01

    3.2 - Surface Drilling ------------------------------ COSTNumber In-Mine Drilling Program Cost Estimate for Case 1 -Development In-Mine Drilling The cost and time required for

  12. Applied Microearthquake Techniques for Geothermal Resource Development

    E-Print Network [OSTI]

    Foulger, G. R.

    . In recent years, interest in exploiting geothermal energy has increased greatly, accompanied by interest. The microearthquake techniques currently producing the most useful results for geothermal energy production, and whichApplied Microearthquake Techniques for Geothermal Resource Development Gillian R. Foulger1 & Bruce

  13. The effect of the 2010 Gulf oil spill on public attitudes toward offshore oil drilling and wind development

    E-Print Network [OSTI]

    Firestone, Jeremy

    The effect of the 2010 Gulf oil spill on public attitudes toward offshore oil drilling and wind affected attitudes to offshore energy. Overall support for offshore wind (82%) was greater than for offshore wind development increased slightly, again not significantly. Although overall support levels did

  14. Geothermal COMPAX drill bit development. Final technical report, July 1, 1976-September 30, 1982

    SciTech Connect (OSTI)

    Hibbs, L.E. Jr.; Sogoian, G.C.; Flom, D.G.

    1984-04-01

    The objective was to develop and demonstrate the performance of new drill bit designs utilizing sintered polycrystalline diamond compacts for the cutting edges. The scope included instrumented rock cutting experiments under ambient conditions and at elevated temperature and pressure, diamond compact wear and failure mode analysis, rock removal modeling, bit design and fabrication, full-scale laboratory bit testing, field tests, and performance evaluation. A model was developed relating rock cutting forces to independent variables, using a statistical test design and regression analysis. Experiments on six rock types, covering a range of compressive strengths from 8 x 10/sup 3/ psi to 51 x 10/sup 3/ psi, provided a satisfactory test of the model. Results of the single cutter experiments showed that the cutting and thrust (penetration) forces, and the angle of the resultant force, are markedly affected by rake angle, depth of cut, and speed. No unusual force excursions were detected in interrupted cutting. Wear tests on two types of diamond compacts cutting Jack Fork Sandstone yielded wear rates equivalent at high cutting speeds, where thermal effects are probably operative. At speeds below approx. 400 surface feet per minute (sfm), the coarser sintered diamond product was superior. 28 refs., 235 figs., 55 tabs.

  15. Application of horizontal drilling in the development of a complex turbidite sandstone reservoir, Elk Hills Field, Kern County, California

    SciTech Connect (OSTI)

    Reid, S.A. (Bechtel Petroleum Operations, Inc., Tupman, CA (USA)); McJannet, G.S. (Dept. of Energy, Tupman, CA (USA)); Hart, O.D. (Chevron Inc., Tupman, CA (USA))

    1990-05-01

    Horizontal drilling techniques have been used at the Elk Hills field, to more effectively produce the complex 26R reservoir. This Stevens zone reservoir of the Miocene Monterey Formation contains turbid sediments deposited in a deep-sea fan setting and consists of several distinct sandstone layers averaging 150 ft thick and usually separated by mudstone beds. Layers in the reservoir dip as much as 50{degree} southwest. An expanding gas cap makes many vertical wells less favorable to operate. Horizontal completions were thought ideal for the pool because (1) original oil-water contact is level and believed stable, (2) water production is low, (3) a horizontal well provides for a long production life; and (4) several sandstone layers can be produced through one well. For the first well, the plan was to redrill an idle well to horizontal along an arc with a radius of 350 ft. The horizontal section was to be up to 1,000 ft long and extend northeast slightly oblique to dip just above the average oil-water contact. The well was drilled in September 1988, reached horizontal nearly as planned, was completed after perforating 210 ft of oil sand, and produced a daily average of 1,000 bbl oil and 8 bbl of water. However, structural influence was stronger than expected, causing the horizontal drill path to turn directly updip away from the bottom-hole target area. The well also encountered variable oil-water contacts, with more than half the horizontal section possibly water productive. Geologic and drilling data from the first well were used for planning another well. This well was drilled in October 1989, and was highly successful with over 1,000 ft of productive interval.

  16. Sidetracking technology for coiled-tubing drilling

    SciTech Connect (OSTI)

    Leising, L.J.; Doremus, D.M.; Hearn, D.D.; Rike, E.A.; Paslay, P.R.

    1996-05-01

    Coiled-tubing (CT) drilling is a rapidly growing new technology that has been used for shallow new wells and re-entry applications. Through-tubing drilling has evolved as a major application for CT drilling. The remaining key enabling technology for viable through-tubing drilling is the ability to sidetrack in casing below the tubing tail. This paper describes the three technologies developed for sidetracking and presents a mathematical model of forces, penetration rates, and torques for window milling with the cement-sidetracking (CS) technique. Window milling has been a seat of the pants operation in the past. To the authors` knowledge, this is the first published work on the mechanics of window milling. The results from several yard tests and one field test are presented and show some of the problems associated with sidetracking.

  17. Development of a method for predicting the performance and wear of PDC (polycrystalline diamond compact) drill bits

    SciTech Connect (OSTI)

    Glowka, D.A.

    1987-09-01

    A method is developed for predicting cutter forces, temperatures, and wear on PDC bits as well as integrated bit performance parameters such as weight-on-bit, drilling torque, and bit imbalance. A computer code called PDCWEAR has been developed to make this method available as a tool for general bit design and analysis. The method uses single-cutter data to provide a measure of rock drillability and employs theoretical considerations to account for interaction among closely spaced cutters on the bit. Experimental data are presented to establish the effects of cutter size and wearflat area on the forces that develop during rock cutting. Waterjet assistance is shown to significantly reduce cutting forces, thereby potentially extending bit life and reducing weight-on-bit and torque requirements in hard rock. The effects of several other design and operating parameters on bit life and drilling performance are also investigated.

  18. Rookie Drill 

    E-Print Network [OSTI]

    Unknown

    2011-09-05

    The application of potassium chloride (KCl) as a temporary clay stabilizing additive in water-based drilling fluids is problematic in chloride-sensitive formations. However, failure to utilize clay stabilization leads to additional costs to drilling...

  19. Knowledge Engineering Technique for Cluster Development

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Knowledge Engineering Technique for Cluster Development Pradorn Sureephong1 , Nopasit Chakpitak1 management by using knowledge engineering which is one of the most important method for managing knowledge. This work analyzed three well known knowledge engineering methods, i.e. MOKA, SPEDE and Common

  20. A History of Geothermal Energy Research and Development in the United States. Drilling 1976-2006

    SciTech Connect (OSTI)

    none,

    2010-09-01

    This report, the second in a four-part series, summarizes significant research projects performed by the U.S. Department of Energy (DOE) over 30 years to overcome challenges in drilling and to make generation of electricity from geothermal resources more cost-competitive.

  1. Advanced drilling systems study.

    SciTech Connect (OSTI)

    Pierce, Kenneth G.; Livesay, Billy Joe; Finger, John Travis

    1996-05-01

    This report documents the results of a study of advanced drilling concepts conducted jointly for the Natural Gas Technology Branch and the Geothermal Division of the U.S. Department of Energy. A number of alternative rock cutting concepts and drilling systems are examined. The systems cover the range from current technology, through ongoing efforts in drilling research, to highly speculative concepts. Cutting mechanisms that induce stress mechanically, hydraulically, and thermally are included. All functions necessary to drill and case a well are considered. Capital and operating costs are estimated and performance requirements, based on comparisons of the costs for alternative systems to conventional drilling technology, are developed. A number of problems common to several alternatives and to current technology are identified and discussed.

  2. Sidetracking technology for coiled tubing drilling

    SciTech Connect (OSTI)

    Leising, L.J.; Hearn, D.D.; Rike, E.A.

    1995-12-31

    Coiled tubing (CT) drilling is a rapidly growing new technology that has been used for shallow new wells and reentry applications. A new market has evolved as being a major application for CT drilling. This market is through-tubing drilling. The lower cost of mobilization of a coiled tubing unit (CTU) to an offshore platform or Arctic wellsite vs. a rotary rig provides additional economic incentive. In addition, the ease of drilling 4-3/4-in. and smaller boreholes with CT is an advantage in a region which does not have an established practice of slimhole drilling. The remaining key enabling technology for viable through-tubing drilling is the ability to sidetrack in casing below the tubing tail. The three technologies (cement sidetracking, whipstock in cement, and through-tubing whipstock) that have been developed for sidetracking are described in this paper. A mathematical model of forces, penetration rates, and torques for window milling with the cement sidetracking technique is presented. Window milling has been a {open_quotes}seat of the pants{close_quotes} operation in the past, to the authors` knowledge, this is the first published work on the mechanics of window milling. The analysis has shed much light on the interaction between motor bending stiffness, motor bend angle, and allowable advance rates for {open_quotes}time drilling.{close_quotes} The results from several yard tests are presented, and indicate some of the problems associated with sidetracking. The photographs of the sectioned hole/window illustrate the ledges caused downhole from {open_quotes}minor{close_quotes} bottomhole assembly (BHA) changes. The cement sidetrack technique has been successfully applied many times in the field, and the results of one of these field applications is presented.

  3. Liberty Drill 

    E-Print Network [OSTI]

    Duncan Photo

    2011-09-05

    The main goal of drilling a horizontal well is to enhance productivity or injectory by placing a long distance drain-hole within the pay-zone. Poor drilling fluid design results in difficulties such as poor hole cleaning, excessive torque or drag...

  4. DEVELOPMENT OF ADVANCED DRILL COMPONENTS FOR BHA USING MICROWAVE TECHNOLOGY INCORPORATING CARBIDE, DIAMOND COMPOSITES AND FUNCTIONALLY GRADED MATERIALS

    SciTech Connect (OSTI)

    Dinesh Agrawal; Rustum Roy

    2003-01-01

    The microwave processing of materials is a new emerging technology with many attractive advantages over the conventional methods. The advantages of microwave technology for various ceramic systems has already been demonstrated and proven. The recent developments at Penn State have succeeded in applying the microwave technology for the commercialization of WC/Co and diamond based cutting and drilling tools, effectively sintering of metallic materials, and fabrication of transparent ceramics for advanced applications. In recent years, the Microwave Processing and Engineering Center at Penn State University in collaboration with our industrial partner, Dennis Tool Co. has succeeded in commercializing the developed microwave technology partially funded by DOE for WC/Co and diamond based cutting and drilling tools for gas and oil exploration operations. In this program we have further developed this technology to make diamond-carbide composites and metal-carbide-diamond functionally graded materials. Several actual product of diamond-carbide composites have been processed in microwave with better performance than the conventional product. The functionally graded composites with diamond as one of the components has been for the first time successfully developed. These are the highlights of the project.

  5. Automated Drill Modeling for Drilling Process Simulation

    E-Print Network [OSTI]

    Vijayaraghavan, Athulan; Dornfeld, David

    2006-01-01

    formats, respectively. The drills were then meshed using theFigure 7. FIGURE 5: GUI FOR DRILL MODELER. REFERENCES Choi,M. (1970a), “An Analysis of Drill Geometry for Optimum Drill

  6. Deep Drilling Basic Research: Volume 4 - System Description. Final Report, November 1988--August 1990

    SciTech Connect (OSTI)

    Anderson, E.E.; Maurer, W.C.; Hood, M.; Cooper, G.; Cook, N.

    1990-06-01

    The first section of this Volume will discuss the ''Conventional Drilling System''. Today's complex arrangement of numerous interacting systems has slowly evolved from the very simple cable tool rigs used in the late 1800s. Improvements to the conventional drilling rig have varied in size and impact over the years, but the majority of them have been evolutionary modifications. Each individual change or improvement of this type does not have significant impact on drilling efficiency and economics. However, the change is almost certain to succeed, and over time--as the number of evolutionary changes to the system begin to add up--improvements in efficiency and economics can be seen. Some modifications, defined and described in this Volume as Advanced Modifications, have more than just an evolutionary effect on the conventional drilling system. Although the distinction is subtle, there are several examples of incorporated advancements that have had significantly more impact on drilling procedures than would a truly evolutionary improvement. An example of an advanced modification occurred in the late 1970s with the introduction of Polycrystalline Diamond Compact (PDC) drill bits. PDC bits resulted in a fundamental advancement in drilling procedures that could not have been accomplished by an evolutionary improvement in materials metallurgy, for example. The last drilling techniques discussed in this Volume are the ''Novel Drilling Systems''. The extent to which some of these systems have been developed varies from actually being tested in the field, to being no more than a theoretical concept. However, they all have one thing in common--their methods of rock destruction are fundamentally different from conventional drilling techniques. When a novel drilling system is introduced, it is a revolutionary modification of accepted drilling procedures and will completely replace current techniques. The most prominent example of a revolutionary modification in recent history was the complete displacement of cable tool rigs by rotary drilling rigs in the late 1920s.

  7. COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES

    E-Print Network [OSTI]

    Lamb, D.W.

    2013-01-01

    SHAFT SINKING IN-MINE DRILLiNG NEW MINE - 1500 M SURFACEORILUNG SHAFT SINKiNG FACIUTY DEVELOPMENT IN-MINE DRILLINGSURFACE DRILLING FACIUTY DEVELOPMENT IN-MINE DRILLING ~~NGM!

  8. Comprehensive Ocean Drilling

    E-Print Network [OSTI]

    Comprehensive Ocean Drilling Bibliography containing citations related to the Deep Sea Drilling Project, Ocean Drilling Program, Integrated Ocean Drilling Program, and International Ocean Discovery Program Last updated: May 2014 #12;Comprehensive Bibliography Comprehensive Ocean Drilling Bibliography

  9. Drill Field 

    E-Print Network [OSTI]

    Unknown

    2011-09-05

    to externally adjust future forecasts so they are better calibrated. Three experiments with historical data sets of predicted vs. actual quantities, e.g., drilling costs and reserves, are presented and demonstrate that external adjustment of probabilistic...

  10. Further advances in coiled-tubing drilling

    SciTech Connect (OSTI)

    Eide, E.; Brinkhorst, J.; Voelker, H.; Burge, P.; Ewen, R.

    1995-05-01

    The use of coiled tubing (CT) to drill horizontal re-entry wells has received considerable interest in the industry over the last two years. The benefits of being able to drill at balance, safely and in a controlled manner, with nitrogen to reduce downhole pressure while drilling highly depleted reservoirs, provides an advantage over conventional techniques, particularly in reducing formation damage. This paper describes such a horizontal re-entry drilled in the shallow depleted waterflooded reservoir Barenburg in northern Germany. The scope of work for this project included (1) cutting windows through 6 5/8- and 9 5/8-in. casing, (2) drilling a 5 7/8-in.-medium-radius curve, (3) running a 5-in. liner and a 5 1/2-in. parasitic string for nitrogen injection, (4) drilling a 4 3/8-in. horizontal with nitrogen to maintain a balanced condition, (5) running openhole logs, and (6) running 3 1/2-in. slotted liner. The entire program was executed with no intervention from a conventional rig or workover hoist. A special structure to be positioned over the well to support the CT injector head and to provide a work platform had to be constructed for this type of operation. A dedicated mast for lifting pipe and downhole tools was placed on the substructure. The development of a surface-controlled orienting tool and an adjustable motor provided excellent directional capabilities on a 2 3/8-in. CT. This program represents a significant extension of the capabilities of drilling with CT.

  11. Further advances in coiled-tubing drilling

    SciTech Connect (OSTI)

    Eide, E.; Brinkhorst, J.; Voelker, H.; Burge, P.; Ewen, R.L.

    1994-12-31

    The use of coiled tubing to drill horizontal re-entry wells has received considerable interest in the industry over the last two years. The benefit of being able to drill at balance, safely and in a controlled manner, using nitrogen to reduce down hole pressure while drilling highly depleted reservoirs, provides an advantage over conventional techniques, particularly in reducing impairment to the formation. The paper describes such a horizontal re-entry drilled in the shallow depleted water flooded reservoir Barenburg in Northern Germany. The entire program was executed with no intervention from a conventional rig or workover hoist. A special structure to be positioned over the well to support the coiled tubing injector head and to provide a work platform had to be constructed for this type of operation. A dedicated mast for lifting of pipe and down hole tools was placed on the substructure. The development of a surface controlled orienting tool and an adjustable motor provided excellent directional capabilities on a 2 3/8 in. coiled tubing. This program represents a significant extension of the capabilities of drilling with coiled tubing.

  12. High Temperature 300°C Directional Drilling System

    SciTech Connect (OSTI)

    Chatterjee, Kamalesh; Aaron, Dick; Macpherson, John

    2015-07-31

    Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injector and production wells must be accurately placed in the formation fracture network. This requires a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) projects have been initiated to develop a 300°C capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid, and the second adding navigation and telemetry systems. This report is for the first project, “High Temperature 300°C Directional Drilling System, including drill bit, directional motor and drilling fluid, for enhanced geothermal systems,” award number DE-EE0002782. The drilling system consists of a drill bit, a directional motor, and drilling fluid. The DOE deliverables are three prototype drilling systems. We have developed three drilling motors; we have developed four roller-cone and five Kymera® bits; and finally, we have developed a 300°C stable drilling fluid, along with a lubricant additive for the metal-to-metal motor. Metal-to-metal directional motors require coatings to the rotor and stator for wear and corrosion resistance, and this coating research has been a significant part of the project. The drill bits performed well in the drill bit simulator test, and the complete drilling system has been tested drilling granite at Baker Hughes’ Experimental Test Facility in Oklahoma. The metal-to-metal motor was additionally subjected to a flow loop test in Baker Hughes’ Celle Technology Center in Germany, where it ran for more than 100 hours.

  13. Advances in Drilling Technology -E-proceedings of the First International Conference on Drilling Technology (ICDT -2010) and National Workshop on Manpower Development in Petroleum Engineering (NWMDPE -2010), November 18-21, 2010.

    E-Print Network [OSTI]

    Aamodt, Agnar

    Advances in Drilling Technology - E-proceedings of the First International Conference on Drilling of Technology Madras, Chennai (TN) - 600 036, India. Transfer of experience for improved oil well drilling Pål The drilling process is getting increasingly more complex as oil fields mature and technology evolves

  14. Rapid Deployment Drilling System for on-site inspections under a Comprehensive Test Ban Preliminary Engineering Design

    SciTech Connect (OSTI)

    Maurer, W.C.; Deskins, W.G.; McDonald, W.J.; Cohen, J.H. [Maurer Engineering, Inc., Houston, TX (United States); Heuze, F.E.; Butler, M.W. [Lawrence Livermore National Lab., CA (United States)

    1996-09-01

    While not a new drilling technology, coiled-tubing (CT) drilling continues to undergo rapid development and expansion, with new equipment, tools and procedures developed almost daily. This project was undertaken to: analyze available technological options for a Rapid Deployment Drilling System (RDDS) CT drilling system: recommend specific technologies that best match the requirements for the RDDS; and highlight any areas where adequate technological solutions are not currently available. Postshot drilling is a well established technique at the Nevada Test Site (NTS). Drilling provides essential data on the results of underground tests including obtaining samples for the shot zone, information on cavity size, chimney dimensions, effects of the event on surrounding material, and distribution of radioactivity.

  15. HETEROGENEOUS SHALLOW-SHELF CARBONATE BUILDUPS IN THE PARADOX BASIN, UTAH AND COLORADO: TARGETS FOR INCREASED OIL PRODUCTION AND RESERVES USING HORIZONTAL DRILLING TECHNIQUES

    SciTech Connect (OSTI)

    David E. Eby; Thomas C. Chidsey, Jr.; Kevin McClure; Craig D. Morgan

    2003-07-01

    The Paradox Basin of Utah, Colorado, Arizona, and New Mexico contains nearly 100 small oil fields producing from carbonate buildups within the Pennsylvanian (Desmoinesian) Paradox Formation. These fields typically have one to 10 wells with primary production ranging from 700,000 to 2,000,000 barrels (111,300-318,000 m{sup 3}) of oil per field and a 15 to 20 percent recovery rate. At least 200 million barrels (31.8 million m{sup 3}) of oil will not be recovered from these small fields because of inefficient recovery practices and undrained heterogeneous reservoirs. Several fields in southeastern Utah and southwestern Colorado are being evaluated as candidates for horizontal drilling and enhanced oil recovery from existing vertical wells based upon geological characterization and reservoir modeling case studies. Geological characterization on a local scale is focused on reservoir heterogeneity, quality, and lateral continuity, as well as possible reservoir compartmentalization, within these fields. This study utilizes representative cores, geophysical logs, and thin sections to characterize and grade each field's potential for drilling horizontal laterals from existing development wells. The results of these studies can be applied to similar fields elsewhere in the Paradox Basin and the Rocky Mountain region, the Michigan and Illinois Basins, and the Midcontinent region. This report covers research activities for the second half of the third project year (October 6, 2002, through April 5, 2003). The primary work included describing and mapping regional facies of the upper Ismay and lower Desert Creek zones of the Paradox Formation in the Blanding sub-basin, Utah. Regional cross sections show the development of ''clean carbonate'' packages that contain all of the productive reservoir facies. These clean carbonates abruptly change laterally into thick anhydrite packages that filled several small intra-shelf basins in the upper Ismay zone. Examination of upper Ismay cores identified seven depositional facies: open marine, middle shelf, inner shelf/tidal flat, bryozoan mounds, phylloid-algal mounds, quartz sand dunes, and anhydritic salinas. Lower Desert Creek facies include open marine, middle shelf, protomounds/collapse breccia, and phylloid-algal mounds. Mapping the upper Ismay zone facies delineates very prospective reservoir trends that contain porous, productive buildups around the anhydrite-filled intra-shelf basins. Facies and reservoir controls imposed by the anhydritic intra-shelf basins should be considered when selecting the optimal location and orientation of any horizontal drilling from known phylloidalgal reservoirs to undrained reserves, as well as identifying new exploration trends. Although intra-shelf basins are not present in the lower Desert Creek zone of the Blanding sub-basin, drilling horizontally along linear shoreline trends could also encounter previously undrilled, porous intervals and buildups. Technology transfer activities consisted of a technical presentation at a Class II Review conference sponsored by the National Energy Technology Laboratory at the Center for Energy and Economic Diversification in Odessa, Texas. The project home page was updated on the Utah Geological Survey Internet web site.

  16. Development of a Test Technique to Determine the Thermal Conductivity...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Development of a Test Technique to Determine the Thermal Conductivity of Large Refractory Ceramic Test Specimens Citation Details In-Document Search Title:...

  17. Industrial Lighting Techniques and New Developments 

    E-Print Network [OSTI]

    Colotti, M. A.

    1985-01-01

    The energy crisis of the early seventies has had a drastic influence on both the application and development of light sources. This situation has forced us to examine old methods and search for new answers for improved ...

  18. OCEAN DRILLING PROGRAM LEG 132 PRELIMINARY REPORT

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 132 PRELIMINARY REPORT ENGINEERING II: WESTERN AND CENTRAL PACIFIC Mr. Michael A. Storms Supervisor of Development Engineering Ocean Drilling Program Texas A&M University and Drilling Operations ODP/TAMU Timothy J.G. Francis Deputy Director ODP/TAMU September 1990 #12;This informal

  19. WETTABILITY AND PREDICTION OF OIL RECOVERY FROM RESERVOIRS DEVELOPED WITH MODERN DRILLING AND COMPLETION FLUIDS

    SciTech Connect (OSTI)

    Jill S. Buckley; Norman R. Morrow

    2004-05-01

    We report on progress in three areas. In part one, the wetting effects of synthetic base oils are reported. Part two reports progress in understanding the effects of surfactants of known chemical structures, and part three integrates the results from surface and core tests that show the wetting effects of commercial surfactant products used in synthetic and traditional oil-based drilling fluids. An important difference between synthetic and traditional oil-based muds (SBM and OBM, respectively) is the elimination of aromatics from the base oil to meet environmental regulations. The base oils used include dearomatized mineral oils, linear alpha-olefins, internal olefins, and esters. We show in part one that all of these materials except the esters can, at sufficiently high concentrations, destabilize asphaltenes. The effects of asphaltenes on wetting are in part related to their stability. Although asphaltenes have some tendency to adsorb on solid surfaces from a good solvent, that tendency can be much increased near the onset of asphaltene instability. Tests in Berea sandstone cores demonstrate wetting alteration toward less water-wet conditions that occurs when a crude oil is displaced by paraffinic and olefinic SBM base oils, whereas exposure to the ester products has little effect on wetting properties of the cores. Microscopic observations with atomic forces microscopy (AFM) and macroscopic contact angle measurements have been used in part 2 to explore the effects on wetting of mica surfaces using oil-soluble polyethoxylated amine surfactants with varying hydrocarbon chain lengths and extent of ethoxylation. In the absence of water, only weak adsorption occurs. Much stronger, pH-dependent adsorption was observed when water was present. Varying hydrocarbon chain length had little or no effect on adsorption, whereas varying extent of ethoxylation had a much more significant impact, reducing contact angles at nearly all conditions tested. Preequilibration of aqueous and oleic phases appeared to have little influence over surfactant interactions with the mica surface; the solubility in water of all three structures appeared to be very limited. Commercial emulsifiers for both SBM and OBM formulations are blends of tall oil fatty acids and their polyaminated derivatives. In part three of this report, we integrate observations on smooth surfaces with those in Berea sandstone cores to show the effects of low concentrations of these products with and without the added complexity of adsorbed material from crude oils. Unlike the polyethoxylated amines studied in part two, there are significant non-equilibrium effects that can occur when water first contacts oil with dissolved surfactant. Very oil-wet conditions can be produced on first contact. Surfactant dissolved in oil had less effect on wetting alteration for one combination of crude oil and surfactant, although the generality of this observation can only be assessed by additional tests with crude oils of different composition. The wettability-altering effect of surfactants on both mica and Berea sandstone was most significant when they contacted surfaces after adsorption of crude oil components. Tests without crude oil might underestimate the extent of wetting change possible with these SBM and OBM emulsifiers.

  20. 27. Annual Offshore Technology Conference: 1995 Proceedings. Volume 4: Field drilling and development systems

    SciTech Connect (OSTI)

    1995-12-31

    This conference proceedings represents volume 4 of a four volume set of offshore oil and gas operation and development. This proceedings includes papers dealing with subsea flowlines and connectors; well completion practices; new technologies associated with subsea wellheads; multiphase flow pumping and flow meters; and materials testing procedures for well tubulars. It also has a section on the overall technology utilization in developing the offshore areas of Brazil and Norway.

  1. An evaluation of subsea pump technologies that can be used to achieve dual gradient drilling 

    E-Print Network [OSTI]

    Oluwadairo, Tolulope

    2009-05-15

    Dual Gradient Drilling is an exciting technology which promises to solve the current technical hurdles and economic risks of Deepwater Drilling. Several techniques for Dual Gradient Drilling have been proposed to the ...

  2. Drill string enclosure

    DOE Patents [OSTI]

    Jorgensen, Douglas K. (Idaho Falls, ID); Kuhns, Douglass J. (Idaho Falls, ID); Wiersholm, Otto (Idaho Falls, ID); Miller, Timothy A. (Idaho Falls, ID)

    1993-01-01

    The drill string enclosure consists of six component parts, including; a top bracket, an upper acrylic cylinder, an acrylic drill casing guide, a lower acrylic cylinder, a bottom bracket, and three flexible ducts. The upper acrylic cylinder is optional based upon the drill string length. The drill string enclosure allows for an efficient drill and sight operation at a hazardous waste site.

  3. Drill string enclosure

    DOE Patents [OSTI]

    Jorgensen, D.K.; Kuhns, D.J.; Wiersholm, O.; Miller, T.A.

    1993-03-02

    The drill string enclosure consists of six component parts, including; a top bracket, an upper acrylic cylinder, an acrylic drill casing guide, a lower acrylic cylinder, a bottom bracket, and three flexible ducts. The upper acrylic cylinder is optional based upon the drill string length. The drill string enclosure allows for an efficient drill and sight operation at a hazardous waste site.

  4. Advanced Mud System for Microhole Coiled Tubing Drilling

    SciTech Connect (OSTI)

    Kenneth Oglesby

    2008-12-01

    An advanced mud system was designed and key components were built that augment a coiled tubing drilling (CTD) rig that is designed specifically to drill microholes (less than 4-inch diameter) with advanced drilling techniques. The mud system was tailored to the hydraulics of the hole geometries and rig characteristics required for microholes and is capable of mixing and circulating mud and removing solids while being self contained and having zero discharge capability. Key components of this system are two modified triplex mud pumps (High Pressure Slurry Pumps) for advanced Abrasive Slurry Jetting (ASJ) and a modified Gas-Liquid-Solid (GLS) Separator for well control, flow return and initial processing. The system developed also includes an additional component of an advanced version of ASJ which allows cutting through most all materials encountered in oil and gas wells including steel, cement, and all rock types. It includes new fluids and new ASJ nozzles. The jetting mechanism does not require rotation of the bottom hole assembly or drill string, which is essential for use with Coiled Tubing (CT). It also has low reactive forces acting on the CT and generates cuttings small enough to be easily cleaned from the well bore, which is important in horizontal drilling. These cutting and mud processing components and capabilities compliment the concepts put forth by DOE for microhole coiled tubing drilling (MHTCTD) and should help insure the reality of drilling small diameter holes quickly and inexpensively with a minimal environmental footprint and that is efficient, compact and portable. Other components (site liners, sump and transfer pumps, stacked shakers, filter membranes, etc.. ) of the overall mud system were identified as readily available in industry and will not be purchased until we are ready to drill a specific well.

  5. Laboratory development and field application of a novel water-based drill-in fluid for geopressured horizontal wells

    SciTech Connect (OSTI)

    Dobson, J.W.; Harrison, J.C.; Hale, A.H.

    1996-12-31

    Research has identified a novel water-based drill-in fluid for drilling and completing geopressured horizontal wells. This fluid has a unique combination of properties which make it especially suitable for geopressured applications. They include the use of calcium and/or zinc bromide as a base brine, minimal concentration of calcium carbonate as bridging material, low plastic viscosity, tight fluid loss control, good filter cake properties, and excellent return permeability. This drill-in fluid has been used successfully to drill a 1,200 foot production interval, 4.75 inch diameter wellbore in the Gulf of Mexico with a system weight of 13.2 lbm/gal, bottom hole temperature of 185{degrees} F., and a 1400 to 1700 psi overbalance. The system functioned very well in both the drilling and completion operations. Fluid rheology was easily maintainable and the hole conditions were excellent without torque or drag problems. Initial production data suggests that the well is producing at expected rates with low drawdown pressure.

  6. Impedance matched joined drill pipe for improved acoustic transmission

    DOE Patents [OSTI]

    Moss, William C. (San Mateo, CA)

    2000-01-01

    An impedance matched jointed drill pipe for improved acoustic transmission. A passive means and method that maximizes the amplitude and minimize the temporal dispersion of acoustic signals that are sent through a drill string, for use in a measurement while drilling telemetry system. The improvement in signal transmission is accomplished by replacing the standard joints in a drill string with joints constructed of a material that is impedance matched acoustically to the end of the drill pipe to which it is connected. Provides improvement in the measurement while drilling technique which can be utilized for well logging, directional drilling, and drilling dynamics, as well as gamma-ray spectroscopy while drilling post shot boreholes, such as utilized in drilling post shot boreholes.

  7. Improved Efficiency of Oil Well Drilling through Case Based Reasoning

    E-Print Network [OSTI]

    Aamodt, Agnar

    1 Improved Efficiency of Oil Well Drilling through Case Based Reasoning Paal Skalle Norwegian drilling, has been developed in cooperation with an oil company. From several reoccurring problems during oil well drilling the problem of "lost circulation", i.e. loss of circulating drilling fluid

  8. Additive for drilling fluid

    SciTech Connect (OSTI)

    Forrest, G.T.

    1992-04-07

    This patent describes a product for use in the drilling of wells. It comprises a drilling fluid and peanut hulls ground to powder form added to the drilling fluid.

  9. Development of the Passive Cooling Technique in China 

    E-Print Network [OSTI]

    Zhou, J.; Wu, J.; Zhang, G.; Xu, Y.

    2006-01-01

    With more and more energy and environmental issues, the energy-saving and sustainable development of buildings is of utmost concern to the building industry. Passive cooling techniques can optimally utilize natural resources in order to reduce...

  10. Development of manufacturing technique for composite structures for robotic applications

    E-Print Network [OSTI]

    Dixon, Theresa, S.B. Massachusetts Institute of Technology

    2010-01-01

    An experimental study was performed with the aim of developing a technique for manufacturing composite parts for use in dynamic robotic applications in lieu of heavy and expensive metal parts used in conventional robotic ...

  11. Development of Optimization Systems Analysis Technique for Texas Water Resources 

    E-Print Network [OSTI]

    Hann, R. W.

    1969-01-01

    This report summarizes the results of the research project, Development of Optimization - Systems Analysis Techniques for Texas Water Resources. Several analytical models which were obtained and modified for use in ...

  12. Steerable percussion air drilling system

    SciTech Connect (OSTI)

    Bui, H.D.; Gray, M.A.; Oliver, M.S.

    1995-07-01

    In the Steerable Percussion Air Drilling System (SPADS), air percussion is used to drill directionally in hard formations. Compared to mud or air powered PDM motors, SPADS offers directional drilling at high penetration rate, reduced mud costs, negligible formation damage, and immediate indication of hole productivity. Field tests turned up problems ranging from tool design to operation procedures; remedies were developed. There is an optimum WOB (weight on bit) at which torque is reasonably low. The hammer was tested at three different line pressures (200, 300, 350 psig) at optimum WOB in granite, limestone, and sandstone.

  13. The IEA's role in advanced geothermal drilling.

    SciTech Connect (OSTI)

    Hoover, Eddie Ross; Jelacic, Allan; Finger, John Travis; Tyner, Craig E.

    2004-06-01

    This paper describes an 'Annex', or task, that is part of the International Energy Agency's Geothermal Implementing Agreement. Annex 7 is aimed at improving the state of the art in geothermal drilling, and has three subtasks: an international database on drilling cost and performance, a 'best practices' drilling handbook, and collaborative testing among participating countries. Drilling is an essential and expensive part of geothermal exploration, production, and maintenance. High temperature, corrosive fluids, and hard, fractured formations increase the cost of drilling, logging, and completing geothermal wells, compared to oil and gas. Cost reductions are critical because drilling and completing the production and injection well field can account for approximately half the capital cost for a geothermal power project. Geothermal drilling cost reduction can take many forms, e.g., faster drilling rates, increased bit or tool life, less trouble (twist-offs, stuck pipe, etc.), higher per-well production through multilaterals, and others. Annex 7 addresses all aspects of geothermal well construction, including developing a detailed understanding of worldwide geothermal drilling costs, understanding geothermal drilling practices and how they vary across the globe, and development of improved drilling technology. Objectives for Annex 7 include: (1) Quantitatively understand geothermal drilling costs and performance from around the world and identify ways to improve costs, performance, and productivity. (2) Identify and develop new and improved technologies for significantly reducing the cost of geothermal well construction. (3) Inform the international geothermal community about these drilling technologies. (4) Provide a vehicle for international cooperation, collaborative field tests, and data sharing toward the development and demonstration of improved geothermal drilling technology.

  14. Drilling optimization using drilling simulator software 

    E-Print Network [OSTI]

    Salas Safe, Jose Gregorio

    2004-09-30

    restructures, large dips, and hard and abrasive rocks. The drilling performance in this section has a strong impact in the profitability of the field. A number of simulations using geological drilling logs and the concept of the learning curve defined...

  15. HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING

    SciTech Connect (OSTI)

    Robert Radtke; David Glowka; Man Mohan Rai; David Conroy; Tim Beaton; Rocky Seale; Joseph Hanna; Smith Neyrfor; Homer Robertson

    2008-03-31

    Commercial introduction of Microhole Technology to the gas and oil drilling industry requires an effective downhole drive mechanism which operates efficiently at relatively high RPM and low bit weight for delivering efficient power to the special high RPM drill bit for ensuring both high penetration rate and long bit life. This project entails developing and testing a more efficient 2-7/8 in. diameter Turbodrill and a novel 4-1/8 in. diameter drill bit for drilling with coiled tubing. The high-power Turbodrill were developed to deliver efficient power, and the more durable drill bit employed high-temperature cutters that can more effectively drill hard and abrasive rock. This project teams Schlumberger Smith Neyrfor and Smith Bits, and NASA AMES Research Center with Technology International, Inc (TII), to deliver a downhole, hydraulically-driven power unit, matched with a custom drill bit designed to drill 4-1/8 in. boreholes with a purpose-built coiled tubing rig. The U.S. Department of Energy National Energy Technology Laboratory has funded Technology International Inc. Houston, Texas to develop a higher power Turbodrill and drill bit for use in drilling with a coiled tubing unit. This project entails developing and testing an effective downhole drive mechanism and a novel drill bit for drilling 'microholes' with coiled tubing. The new higher power Turbodrill is shorter, delivers power more efficiently, operates at relatively high revolutions per minute, and requires low weight on bit. The more durable thermally stable diamond drill bit employs high-temperature TSP (thermally stable) diamond cutters that can more effectively drill hard and abrasive rock. Expectations are that widespread adoption of microhole technology could spawn a wave of 'infill development' drilling of wells spaced between existing wells, which could tap potentially billions of barrels of bypassed oil at shallow depths in mature producing areas. At the same time, microhole coiled tube drilling offers the opportunity to dramatically cut producers' exploration risk to a level comparable to that of drilling development wells. Together, such efforts hold great promise for economically recovering a sizeable portion of the estimated remaining shallow (less than 5,000 feet subsurface) oil resource in the United States. The DOE estimates this U.S. targeted shallow resource at 218 billion barrels. Furthermore, the smaller 'footprint' of the lightweight rigs utilized for microhole drilling and the accompanying reduced drilling waste disposal volumes offer the bonus of added environmental benefits. DOE analysis shows that microhole technology has the potential to cut exploratory drilling costs by at least a third and to slash development drilling costs in half.

  16. Optimizing drilling performance using a selected drilling fluid

    DOE Patents [OSTI]

    Judzis, Arnis (Salt Lake City, UT); Black, Alan D. (Coral Springs, FL); Green, Sidney J. (Salt Lake City, UT); Robertson, Homer A. (West Jordan, UT); Bland, Ronald G. (Houston, TX); Curry, David Alexander (The Woodlands, TX); Ledgerwood, III, Leroy W. (Cypress, TX)

    2011-04-19

    To improve drilling performance, a drilling fluid is selected based on one or more criteria and to have at least one target characteristic. Drilling equipment is used to drill a wellbore, and the selected drilling fluid is provided into the wellbore during drilling with the drilling equipment. The at least one target characteristic of the drilling fluid includes an ability of the drilling fluid to penetrate into formation cuttings during drilling to weaken the formation cuttings.

  17. Development of Improved Oil Field Waste Injection Disposal Techniques

    SciTech Connect (OSTI)

    Terralog Technologies

    2002-11-25

    The goals of this project have was to: (1) assemble and analyze a comprehensive database of past waste injection operations; (2) develop improved diagnostic techniques for monitoring fracture growth and formation changes; (3) develop operating guidelines to optimize daily operations and ultimate storage capacity of the target formation; and (4) to apply these improved models and guidelines in the field.

  18. Development of Improved Oil Field Waste Injection Disposal Techniques

    SciTech Connect (OSTI)

    Terralog Technologies USA Inc.

    2001-12-17

    The goals of this DOE sponsored project are to: (1) assemble and analyze a comprehensive database of past waste injection operations; (2) develop improved diagnostic techniques for monitoring fracture growth and formation changes; (3) develop operating guidelines to optimize daily operations and ultimate storage capacity of the target formation; and (4) to test these improved models and guidelines in the field.

  19. The Role of Isotopes in Monitoring Water Quality Impacts Associated with Shale Gas Drilling

    E-Print Network [OSTI]

    Walter, M.Todd

    The Role of Isotopes in Monitoring Water Quality Impacts Associated with Shale Gas Drilling be the result of drilling activities, including shale gas drilling. Monitoring techniques exist for detecting discuss these techniques in more detail within the context of shale gas drilling activities in New York

  20. Environmental Measurement-While-Drilling System and Horizontal Directional Drilling Technology Demonstration, Hanford Site

    SciTech Connect (OSTI)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A.; Myers, D.A.; Gardner, M.G.; Williamson, T.; Huffman, J.

    1999-06-01

    The Environmental Measurement-While-Drilling (EMWD) system and Horizontal Directional Drilling (HDD) were successfully demonstrated at the Mock Tank Leak Simulation Site and the Drilling Technology Test Site, Hanford, Washington. The use of directional drilling offers an alternative to vertical drilling site characterization. Directional drilling can develop a borehole under a structure, such as a waste tank, from an angled entry and leveling off to horizontal at the desired depth. The EMWD system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drill bit data during drilling operations. The technology demonstration consisted of the development of one borehole under a mock waste tank at a depth of {approximately} {minus}8 m ({minus}27 ft.), following a predetermined drill path, tracking the drill path to within a radius of {approximately}1.5 m (5 ft.), and monitoring for zones of radiological activity using the EMWD system. The purpose of the second borehole was to demonstrate the capability of drilling to a depth of {approximately} {minus}21 m ({minus}70 ft.), the depth needed to obtain access under the Hanford waste tanks, and continue drilling horizontally. This report presents information on the HDD and EMWD technologies, demonstration design, results of the demonstrations, and lessons learned.

  1. DRILLING MACHINES GENERAL INFORMATION

    E-Print Network [OSTI]

    Gellman, Andrew J.

    TC 9-524 Chapter 4 DRILLING MACHINES GENERAL INFORMATION PURPOSE This chapter contains basic information pertaining to drilling machines. A drilling machine comes in many shapes and sizes, from small hand-held power drills to bench mounted and finally floor-mounted models. They can perform operations

  2. INTEGRATED OCEAN DRILLING PROGRAM 2011 OCEAN DRILLING CITATION REPORT

    E-Print Network [OSTI]

    INTEGRATED OCEAN DRILLING PROGRAM 2011 OCEAN DRILLING CITATION REPORT covering citations related to the Deep Sea Drilling Project, Ocean Drilling Program, and Integrated Ocean Drilling Program from Geo Drilling Program Publication Services September 2011 #12;OVERVIEW OF THE OCEAN DRILLING CITATION DATABASE

  3. Downhole control -- The key to coiled tubing drilling efficiency

    SciTech Connect (OSTI)

    1996-10-01

    Coiled tubing drilling has experienced dramatic growth in recent years. Originally a step-child, the technique now claims built-for-purpose equipment and promises cost-effective drilling with little damage to formations. The paper describes a bottom hole assembly and an orienting tool designed to be used to control coiled tubing drilling.

  4. Impact of 3-D seismic data on the Nigerian National Petroleum Corporation/Chevron Nigeria Limited joint venture development drilling program

    SciTech Connect (OSTI)

    Quam, S. (Chevron Nigeria Ltd., Lagos (Nigeria))

    1993-09-01

    The Nigerian National Petroleum Corporation/Chevron Nigeria Limited joint venture has been acquiring three-dimensional (3-D) seismic data over its concessions since 1984. To date, 1700 km[sup 2] have been recorded and processed at a cumulative cost of US $39 million. During 1991 - 1992, 20 development wells were drilled based directly on new 3-D seismic interpretations. These wells have added 148 million bbl of oil in new recoverable reserves, and to date have added 37,000 bbl/day to the joint venture's production. In addition, the 3-D interpretations have resulted in a sizable inventory of wells for future development drilling. The new 3-D interpretations provided more accurate pictures of fault patterns, fluid contacts, channel trends, stratigraphic continuity, and velocity/amplitude anomalies. In addition, the 3-D data were invaluable in designing low risk, directional well trajectories to tap relatively thin oil legs under large gas caps. Wells often were programmed to hit several objectives at their respective gas/oil contacts, resulting in maximized net oil sand pays and reducing the risk of gas production. In order to do this, directional [open quotes]sharpshooting,[close quotes] accurate depth conversion of the seismic time maps, was critical. By using the 3-D seismic, checkshot, and sonic data to develop a variable velocity space, well-top prognoses within 50 ft at depths of 6,000-10,000 ft were possible, and were key to the success of the program. As the joint venture acreage becomes more mature, development wells will be drilled for smaller numbers of stacked objectives, and sometimes for single sands. Highly accurate 3-D interpretations and depth conversions will become even more critical in order to tap thinner pay zones in a cost-effect manner.

  5. Development of neutron tomography and phase contrast imaging technique

    SciTech Connect (OSTI)

    Kashyap, Y. S.; Agrawal, Ashish; Sarkar, P. S.; Shukla, Mayank; Sinha, Amar

    2013-02-05

    This paper presents design and development of a state of art neutron imaging technique at CIRUS reactor with special reference for techniques adopted for tomography and phase contrast imaging applications. Different components of the beamline such as collimator, shielding, sample manipulator, digital imaging system were designed keeping in mind the requirements of data acquisition time and resolution. The collimator was designed in such a way that conventional and phase contrast imaging can be done using same collimator housing. We have done characterization of fuel pins, study of hydride blisters in pressure tubes hydrogen based cells, two phase flow visualization, and online study of locomotive parts etc. using neutron tomography and radiography technique. We have also done some studies using neutron phase contrast imaging technique on this beamline.

  6. Steerable percussion air drilling system

    SciTech Connect (OSTI)

    Bui, H.D.; Oliver, M.S.; Gray, M.A.

    1993-12-31

    The cost-sharing contract between the US Department of Energy and Smith International provides the funding to further develop this concept into two complete steerable percussion air drilling system prototypes, each integrated with a navigation tool (wireline steering tool), a bend sub, stabilizing devices, and to conduct laboratory and field testing necessary to prepare the system for commercial realization. Such a system would make available for the first time the ability to penetrate earthen formations by the percussion method, using compressed air as the drilling fluid, and at the same time allow the directional control and steering of the drill bit. While the drill string is not rotating (slide mode), one can orient to build angle in the desired direction at a predictable rate. This build rate can be in the range of 1--20 degrees per one hundred feet and proceeds until the desired inclination or direction has been obtained. The drill pipe is then set in rotation, nullifying the effect of the bend angle, and causes the assembly to drill straight. The sliding procedure can be repeated as often as corrections for hole`s inclination or direction are needed.

  7. Status Report A Review of Slimhole Drilling

    SciTech Connect (OSTI)

    Zhu, Tao; Carroll, Herbert B.

    1994-09-01

    This 1994 report reviews the various applications of slimhole technology including for exploration in remote areas, low-cost development wells, reentering existing wells, and horizontal and multilateral drilling. Advantages of slimholes to regular holes are presented. Limitations and disadvantages of slimholes are also discussed. In 1994, slimhole drilling was still an ongoing development technology. (DJE 2005)

  8. Handbook of Best Practices for Geothermal Drilling

    Office of Energy Efficiency and Renewable Energy (EERE)

    This handbook focuses on the complex process of drilling a geothermal well, including techniques and hardware that have proven successful for both direct use and electricity generation around the world.

  9. Microhole High-Pressure Jet Drill for Coiled Tubing

    SciTech Connect (OSTI)

    Ken Theimer; Jack Kolle

    2007-06-30

    Tempress Small Mechanically-Assisted High-Pressure Waterjet Drilling Tool project centered on the development of a downhole intensifier (DHI) to boost the hydraulic pressure available from conventional coiled tubing to the level required for high-pressure jet erosion of rock. We reviewed two techniques for implementing this technology (1) pure high-pressure jet drilling and (2) mechanically-assisted jet drilling. Due to the difficulties associated with modifying a downhole motor for mechanically-assisted jet drilling, it was determined that the pure high-pressure jet drilling tool was the best candidate for development and commercialization. It was also determined that this tool needs to run on commingled nitrogen and water to provide adequate downhole differential pressure and to facilitate controlled pressure drilling and descaling applications in low pressure wells. The resulting Microhole jet drilling bottomhole assembly (BHA) drills a 3.625-inch diameter hole with 2-inch coil tubing. The BHA consists of a self-rotating multi-nozzle drilling head, a high-pressure rotary seal/bearing section, an intensifier and a gas separator. Commingled nitrogen and water are separated into two streams in the gas separator. The water stream is pressurized to 3 times the inlet pressure by the downhole intensifier and discharged through nozzles in the drilling head. The energy in the gas-rich stream is used to power the intensifier. Gas-rich exhaust from the intensifier is conducted to the nozzle head where it is used to shroud the jets, increasing their effective range. The prototype BHA was tested at operational pressures and flows in a test chamber and on the end of conventional coiled tubing in a test well. During instrumented runs at downhole conditions, the BHA developed downhole differential pressures of 74 MPa (11,000 psi, median) and 90 MPa (13,000 psi, peaks). The median output differential pressure was nearly 3 times the input differential pressure available from the coiled tubing. In a chamber test, the BHA delivered up to 50 kW (67 hhp) hydraulic power. The tool drilled uncertified class-G cement samples cast into casing at a rate of 0.04 to 0.17 m/min (8 to 33 ft/hr), within the range projected for this tool but slower than a conventional PDM. While the tool met most of the performance goals, reliability requires further improvement. It will be difficult for this tool, as currently configured, to compete with conventional positive displacement downhole motors for most coil tubing drill applications. Mechanical cutters on the rotating nozzle head would improve cutting. This tool can be easily adapted for well descaling operations. A variant of the Microhole jet drilling gas separator was further developed for use with positive displacement downhole motors (PDM) operating on commingled nitrogen and water. A fit-for-purpose motor gas separator was designed and yard tested within the Microhole program. Four commercial units of that design are currently involved in a 10-well field demonstration with Baker Oil Tools in Wyoming. Initial results indicate that the motor gas separators provide significant benefit.

  10. Ultrasonic drilling apparatus

    DOE Patents [OSTI]

    Duran, E.L.; Lundin, R.L.

    1988-06-20

    Apparatus attachable to an ultrasonic drilling machine for drilling deep holes in very hard materials, such as boron carbide, is provided. The apparatus utilizes a hollow spindle attached to the output horn of the ultrasonic drilling machine. The spindle has a hollow drill bit attached at the opposite end. A housing surrounds the spindle, forming a cavity for holding slurry. In operation, slurry is provided into the housing, and into the spindle through inlets while the spindle is rotating and ultrasonically reciprocating. Slurry flows through the spindle and through the hollow drill bit to cleanse the cutting edge of the bit during a drilling operation. 3 figs.

  11. Ultrasonic drilling apparatus

    DOE Patents [OSTI]

    Duran, Edward L. (Santa Fe, NM); Lundin, Ralph L. (Los Alamos, NM)

    1989-01-01

    Apparatus attachable to an ultrasonic drilling machine for drilling deep holes in very hard materials, such as boron carbide, is provided. The apparatus utilizes a hollow spindle attached to the output horn of the ultrasonic drilling machine. The spindle has a hollow drill bit attached at the opposite end. A housing surrounds the spindle, forming a cavity for holding slurry. In operation, slurry is provided into the housing, and into the spindle through inlets while the spindle is rotating and ultrasonically reciprocating. Slurry flows through the spindle and through the hollow drill bit to cleanse the cutting edge of the bit during a drilling operation.

  12. Advanced Drilling Systems for EGS

    Office of Energy Efficiency and Renewable Energy (EERE)

    Project objectives: Apply Novateks Stinger® and JackBit® technology in the development of an innovative; durable fixed bladed bit and improved roller cone bit that will increase ROP by three times in drilling hard rock formations normally encountered in developing EGS resources.

  13. Lateral Drilling and Completion Technologies for Shallow-Shelf Carbonates of the Red River and Ratcliffe Formations, Williston Basin

    SciTech Connect (OSTI)

    David Gibbons; Larry A. Carrell; Richard D. George

    1997-07-31

    Luff Exploration Company (LEC) focused on involvement in technologies being developed utilizing horizontal drilling concepts to enhance oil- well productivity starting in 1992. Initial efforts were directed toward high-pressure lateral jetting techniques to be applied in existing vertical wells. After involvement in several failed field attempts with jetting technologies, emphasis shifted to application of emerging technologies for drilling short-radius laterals in existing wellbores and medium-radius technologies in new wells. These lateral drilling technologies were applied in the Mississippi Ratcliffe and Ordovician Red River formations at depths of 2590 to 2890 m (8500 to 9500 ft) in Richland Co., MT; Bowman Co., ND; and Harding Co., SD.

  14. 2007 OCEAN DRILLING CITATION REPORT Covering Deep Sea Drilling Project-

    E-Print Network [OSTI]

    2007 OCEAN DRILLING CITATION REPORT Covering Deep Sea Drilling Project- and Ocean Drilling Program Services on behalf of the Integrated Ocean Drilling Program September 2007 #12;#12;OVERVIEW OF THE OCEAN DRILLING CITATION DATABASE The Ocean Drilling Citation Database, which in February 2007 contained

  15. Core Drilling Demonstration

    Broader source: Energy.gov [DOE]

    Tank Farms workers demonstrate core drilling capabilities for Hanford single-shell tanks. Core drilling is used to determine the current condition of each tank to assist in the overall assessment...

  16. Final Technical Report for “A Heliportable Sonic Drilling Platform for Microhole Drilling and Exploration”

    SciTech Connect (OSTI)

    Lucon, Peter

    2008-05-05

    The Phase I objectives were fully achieved the execution of a program that included the: • Development of a comprehensive model of the sonic drill technology and interaction of the dynamic drilling parameters with the impedance of the earth. • Operation and measurement of the sonic drilling process in the field at full scale. • Comparison of the analytical and experimental results to form an objective and quantified approach to describe the fundamental phenomena and to develop a methodology for automated control of the sonic drilling process. • Conceptual design of a modular sonic drilling system that can be transported to remote sites by helicopter. As a result, the feasibility of a commercially viable sonic drilling technology that can produce microholes up to 1,500 feet in depth, and that is field deployable to remote, environmentally sensitive sites via a helicopter, has been demonstrated.

  17. OCEAN DRILLING PROGRAM LEG 124E ENGINEERING PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 124E ENGINEERING PROSPECTUS PHILIPPINE SEA Michael A. Storms Supr. of Development Engineering Ocean Drilling Program Texas A & M University College Station, Texas 77840 Philip D. Rabinowitz Director ODP/TAMU- Barry W. Harding Manager of Engineering and Drilling Operations ODP/TAMU Louis

  18. Technique development for polarized pipe-to-soil potential measurements

    SciTech Connect (OSTI)

    Dabkowski, J.

    1989-12-01

    Research project PR-200-513 was undertaken with the overall objective to develop practical techniques for determining the polarized pipe-to-soil potential of a buried pipeline. The importance of this project rests with the fact that pipe-to-soil potential measurements are the most commonly used means of assessing the level of cathodic protection on buried gas transmission pipelines. In the recent past years there has been a considerable amount of effort devoted to developing methods and instruments to correct measured pipe-to-soil potentials for IR drops that may occur from currents (from the cathodic protection system or stray sources) in the soil to obtain the polarized potential. However, many of the methods or instruments available are either time-consuming, cumbersome to use in the field, applicable to only certain types of cathodic protection systems and under particular circumstances, subject to influences from stray current sources or not fully developed as of yet. Thus, there is a need to develop a practical method of determining the polarized pipe potential free of IR drop errors. Hence, the objectives of the research program conducted were: (1) to test and evaluate comparatively existing polarized potential measurement approaches, and (2) to develop new approaches to determining the polarized potential.

  19. Sandia Energy - Geothermal Energy & Drilling Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Geothermal Energy & Drilling Technology Home Stationary Power Energy Conversion Efficiency Geothermal Geothermal Energy & Drilling Technology Geothermal Energy & Drilling...

  20. CS 494 Web Development Catalog Description: Techniques and tools for designing developing, publishing, and

    E-Print Network [OSTI]

    , publishing, and maintaining dynamic websites on the World Wide Web. Hypertext / HTML, scripting, mediaStart Guide, Peachpit Press · Molly E. Holzschlag, 250 HTML and Web Design Secrets, Wiley Publishing. · JasonCS 494 ­ Web Development Catalog Description: Techniques and tools for designing developing

  1. Deep Drilling Basic Research: Volume 5 - System Evaluations. Final Report, November 1988--August 1990

    SciTech Connect (OSTI)

    None

    1990-06-01

    This project is aimed at decreasing the costs and increasing the efficiency of drilling gas wells in excess of 15,000 feet. This volume presents a summary of an evaluation of various drilling techniques. Drilling solutions were compared quantitatively against typical penetration rates derived from conventional systems. A qualitative analysis measured the impact of a proposed system on the drilling industry. The evaluations determined that the best candidates f o r improving the speed and efficiency of drilling deep gas wells include: PDC/TSD bits, slim-hole drilling, roller-cone bits, downhole motors, top-driven systems, and coiled-tubing drilling.

  2. HYDROGEN SULFIDE -HIGH TEMPERATURE DRILLING CONTINGENCY PLAN

    E-Print Network [OSTI]

    HYDROGEN SULFIDE - HIGH TEMPERATURE DRILLING CONTINGENCY PLAN OCEAN DRILLING PROGRAM TEXAS A Foundation. ii #12;HYDROGEN SULFIDE-HIGH TEMPERATURE DRILLING CONTINGENCY PLAN OCEAN DRILLING PROGRAM LEG 139

  3. Method of deep drilling

    DOE Patents [OSTI]

    Colgate, Stirling A. (4616 Ridgeway, Los Alamos, NM 87544)

    1984-01-01

    Deep drilling is facilitated by the following steps practiced separately or in any combination: (1) Periodically and sequentially fracturing zones adjacent the bottom of the bore hole with a thixotropic fastsetting fluid that is accepted into the fracture to overstress the zone, such fracturing and injection being periodic as a function of the progression of the drill. (2) Casing the bore hole with ductile, pre-annealed casing sections, each of which is run down through the previously set casing and swaged in situ to a diameter large enough to allow the next section to run down through it. (3) Drilling the bore hole using a drill string of a low density alloy and a high density drilling mud so that the drill string is partially floated.

  4. Training and Drills

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    The volume offers a framework for effective management of emergency response training and drills. Canceled by DOE G 151.1-3.

  5. Elk's drilling pace steadies

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The production level in the Elk Hills oil field in California (normally 161,000 bpd) is expected to remain constant in 1980 with the possibility of a 2000 to 3000 bpd increase in the second 6 months. The drilling pace also is expected to follow the same pattern of increased activity in the second 6 months of the year. The field is part of Naval Petroleum Reserve No. 1, where operation of a gas plant and construction of new production facilities also is occurring. The predicted increase in Elk Hills production would come from operations of the gas plant as it comes fully on stream. The new production facilities include a low temperature separation facility. The possibility of implementing a waterflood program in part of the reserve and the future development of fractured shale sections also are discussed.

  6. Counter-Rotating Tandem Motor Drilling System

    SciTech Connect (OSTI)

    Kent Perry

    2009-04-30

    Gas Technology Institute (GTI), in partnership with Dennis Tool Company (DTC), has worked to develop an advanced drill bit system to be used with microhole drilling assemblies. One of the main objectives of this project was to utilize new and existing coiled tubing and slimhole drilling technologies to develop Microhole Technology (MHT) so as to make significant reductions in the cost of E&P down to 5000 feet in wellbores as small as 3.5 inches in diameter. This new technology was developed to work toward the DOE's goal of enabling domestic shallow oil and gas wells to be drilled inexpensively compared to wells drilled utilizing conventional drilling practices. Overall drilling costs can be lowered by drilling a well as quickly as possible. For this reason, a high drilling rate of penetration is always desired. In general, high drilling rates of penetration (ROP) can be achieved by increasing the weight on bit and increasing the rotary speed of the bit. As the weight on bit is increased, the cutting inserts penetrate deeper into the rock, resulting in a deeper depth of cut. As the depth of cut increases, the amount of torque required to turn the bit also increases. The Counter-Rotating Tandem Motor Drilling System (CRTMDS) was planned to achieve high rate of penetration (ROP) resulting in the reduction of the drilling cost. The system includes two counter-rotating cutter systems to reduce or eliminate the reactive torque the drillpipe or coiled tubing must resist. This would allow the application of maximum weight-on-bit and rotational velocities that a coiled tubing drilling unit is capable of delivering. Several variations of the CRTDMS were designed, manufactured and tested. The original tests failed leading to design modifications. Two versions of the modified system were tested and showed that the concept is both positive and practical; however, the tests showed that for the system to be robust and durable, borehole diameter should be substantially larger than that of slim holes. As a result, the research team decided to complete the project, document the tested designs and seek further support for the concept outside of the DOE.

  7. The important role of drilling fluids in core recovery for scientific drilling (exploration): A case history

    SciTech Connect (OSTI)

    Brown, R.K. [Desert Drilling Fluids, Inc., Winnemucca, NV (United States)

    1995-12-31

    The mineral exploration business uses core analysis to obtain information such as mineral concentration, rock structure, and slope stability. None of these objectives can be accomplished however, if core is not recovered. Inferences can be made regarding sections of drillholes where core recovery is poor, but the need for reliable information often dictates either ``twinning`` a hole to try to obtain the information, or doing expensive directional drilling to ``re-core`` a zone. Often, recovery can be increased by doing a systematic analysis of the drilling systems involved and making sure everything is correct for a particular drilling situation. Rio Narcea Gold Mines, Ltd. is a Spanish-based exploration company with a potentially economic gold deposit in the province of Asturias, Spain. In December, 1993, Desert Drilling Fluids (D.D.F.) sent an engineer to the property to review drilling fluid systems in use. Changes to the drilling fluid system were made over a period of several days that resulted in the core recovery in the ore zone being increased to over 90%. This paper outlines the steps taken in improving the core recovery by examining drilling techniques, drilling fluid systems, and general lithologies involved.

  8. Horizontal slim-hole drilling with coiled tubing; An operator's experience

    SciTech Connect (OSTI)

    Ramos, A.B. Jr.; Faahel, R.A.; Chaffin, M.G.; Pulis, K.H. )

    1992-10-01

    What is believed to be the first horizontal well drilled with directionally controlled coiled tubing recently was completed in the Austin Chalk formation. an existing well was sidetracked out of 4 1/2-in. casing with a conventional whipstock. an average build rate of 15[degrees]/100 ft was achieved in the curve, and a 1,458-ft vertical section was drilled with 2-in. coiled tubing, downhole mud motors, wireline steering tools, a mechanical downhole orienting tool, and 3 7/8-in. bits. This paper discusses the orienting and directional tools and techniques developed during this operation. It also describes improvements made for the second well.

  9. Distributed downhole drilling network

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Fox, Joe; Pixton, David S.

    2006-11-21

    A high-speed downhole network providing real-time data from downhole components of a drilling strings includes a bottom-hole node interfacing to a bottom-hole assembly located proximate the bottom end of a drill string. A top-hole node is connected proximate the top end of the drill string. One or several intermediate nodes are located along the drill string between the bottom-hole node and the top-hole node. The intermediate nodes are configured to receive and transmit data packets transmitted between the bottom-hole node and the top-hole node. A communications link, integrated into the drill string, is used to operably connect the bottom-hole node, the intermediate nodes, and the top-hole node. In selected embodiments, a personal or other computer may be connected to the top-hole node, to analyze data received from the intermediate and bottom-hole nodes.

  10. Development of advanced strain diagnostic techniques for reactor environments.

    SciTech Connect (OSTI)

    Fleming, Darryn D.; Holschuh, Thomas Vernon,; Miller, Timothy J.; Hall, Aaron Christopher; Urrea, David Anthony,; Parma, Edward J.,

    2013-02-01

    The following research is operated as a Laboratory Directed Research and Development (LDRD) initiative at Sandia National Laboratories. The long-term goals of the program include sophisticated diagnostics of advanced fuels testing for nuclear reactors for the Department of Energy (DOE) Gen IV program, with the future capability to provide real-time measurement of strain in fuel rod cladding during operation in situ at any research or power reactor in the United States. By quantifying the stress and strain in fuel rods, it is possible to significantly improve fuel rod design, and consequently, to improve the performance and lifetime of the cladding. During the past year of this program, two sets of experiments were performed: small-scale tests to ensure reliability of the gages, and reactor pulse experiments involving the most viable samples in the Annulated Core Research Reactor (ACRR), located onsite at Sandia. Strain measurement techniques that can provide useful data in the extreme environment of a nuclear reactor core are needed to characterize nuclear fuel rods. This report documents the progression of solutions to this issue that were explored for feasibility in FY12 at Sandia National Laboratories, Albuquerque, NM.

  11. DrillSim: A Simulation Framework for Emergency Response Drills

    E-Print Network [OSTI]

    Venkatasubramanian, Nalini

    DrillSim: A Simulation Framework for Emergency Response Drills Vidhya Balasubramanian, Daniel of these IT solutions is difficult; proofs are not available, simulations lack realism, and drills are expensive and cannot be reproduced. This paper presents DrillSim: a simulation environ- ment that plays out

  12. Report of the Offset Drilling Workshop Ocean Drilling Program

    E-Print Network [OSTI]

    Report of the Offset Drilling Workshop held at Ocean Drilling Program Texas A&M University College Need for an Engineering Leg 35 Realistic Strategies for Offset Drilling 37 Appendix 1 Workshop (Leg 153) 21 Figure 4 "Rig Floor Perception" of Generic Boreholes Drilled During Leg 153 22 Figure 5

  13. Integrated test plan ResonantSonic drilling system technology demonstration-1995, at the Hanford Site: Revision 1

    SciTech Connect (OSTI)

    McLellan, G.W.

    1994-11-17

    This integrated test plan describes the demonstration test of the ResonantSonic drilling system. This demonstration is part of the Office of Technology Development`s Volatile Organic Compound Arid Integrated Demonstration (VOC-Arid ID). Two main purposes of this demonstration are (1) to continue testing the ResonantSonic drilling system compatibility with the Hanford Site waste characterization programs, and (2) to transfer this method for use at the Hanford Site, other government sites, and the private sector. The ResonantSonic method is a dry drilling technique. Field testing of this method began in July 1993. During the next four months, nine holes were drilled, and continuous core samples were retrieved. Penetration rates were 2 to 3 times the baseline, and the operational downtime rate was less than 10%. Successfully demonstrated equipment refinements included a prototype 300 series ResonantSonic head, a new drill rod design for 18-centimeter diameter pipe, and an automated pipe handling system. Various configurations of sampling equipment and drill bits were tested, depending on geologic conditions. The principal objective of the VOC-Arid ID is to determine the viability of emerging technologies that can be used to characterize, remediate, and/or monitor arid or semiarid sites containing VOCs (e.g., carbon tetrachloride) with or without associated metal and radionuclide contamination.

  14. Development of Reservoir Characterization Techniques and Production Models for Exploiting Naturally Fractured Reservoirs

    SciTech Connect (OSTI)

    Wiggins, Michael L.; Brown, Raymon L.; Civan, Faruk; Hughes, Richard G.

    2003-02-11

    This research was directed toward developing a systematic reservoir characterization methodology which can be used by the petroleum industry to implement infill drilling programs and/or enhanced oil recovery projects in naturally fractured reservoir systems in an environmentally safe and cost effective manner. It was anticipated that the results of this research program will provide geoscientists and engineers with a systematic procedure for properly characterizing a fractured reservoir system and a reservoir/horizontal wellbore simulator model which can be used to select well locations and an effective EOR process to optimize the recovery of the oil and gas reserves from such complex reservoir systems.

  15. Slimhole drilling and directional drilling for on-site inspections under a Comprehensive Test Ban: An initial assessment

    SciTech Connect (OSTI)

    Heuze, F. E.

    1995-07-01

    On Site-Inspection (OSI), under the Comprehensive Test Ban being negotiated in the Conference on Disarmament in Geneva, may include drilling at the site of a suspected clandestine underground nuclear explosion to recover radioactive samples. It is in the interest of the drilling party to operate as light and compact a system as possible because it is likely that the drilling equipment will first be airlifted to the country being inspected, and then will be carried by air or surface to the inspection site. It will be necessary for the inspection party to have the capability for more than vertical drilling since there may not be a drilling site available vertically above the suspected nuclear cavity location. This means having, the ability to perform directional drilling and to obtain accurate positioning of the drilling tool. Consequently, several directions may be explored from a single surface drilling pad. If the target depth is expected to be at or less than 600 m (2000 ft), slant drilling may be required to a length well in excess of 600 m. Clearly, the operation must be designed with health and safety features to prevent radioactive exposure if the drilling encounters a nuclear source region. The DOE/LLNL community has developed a strong expertise in this regard. In this initial assessment we focus on the portability and directionality of drilling systems.

  16. December 2001 OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    December 2001 OCEAN DRILLING PROGRAM LEG 203 SCIENTIFIC PROSPECTUS DRILLING AT THE EQUATORIAL -------------------------------- Dr. Jack Bauldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University. Acton Leg Project Manager and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery

  17. February 2002 OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    February 2002 OCEAN DRILLING PROGRAM LEG 204 SCIENTIFIC PROSPECTUS DRILLING GAS HYDRATES ON HYDRATE -------------------------------- Dr. Jack Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University Richter Leg Project Manager and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery

  18. November 2002 OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    November 2002 OCEAN DRILLING PROGRAM LEG 209 SCIENTIFIC PROSPECTUS DRILLING MANTLE PERIDOTITE ALONG Drilling Program Texas A&M University 1000 Discovery Drive College Station TX 77845-9547 USA -------------------------------- Dr. D. Jay Miller Leg Project Manager and Staff Scientist Ocean Drilling Program Texas A&M University

  19. January 2003 OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    January 2003 OCEAN DRILLING PROGRAM LEG 210 SCIENTIFIC PROSPECTUS DRILLING THE NEWFOUNDLAND HALF OF THE NEWFOUNDLAND­IBERIA TRANSECT: THE FIRST CONJUGATE MARGIN DRILLING IN A NON-VOLCANIC RIFT Brian E. Tucholke Co Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University 1000 Discovery

  20. Drilling fluid filter

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe; Garner, Kory

    2007-01-23

    A drilling fluid filter for placement within a bore wall of a tubular drill string component comprises a perforated receptacle with an open end and a closed end. A hanger for engagement with the bore wall is mounted at the open end of the perforated receptacle. A mandrel is adjacent and attached to the open end of the perforated receptacle. A linkage connects the mandrel to the hanger. The linkage may be selected from the group consisting of struts, articulated struts and cams. The mandrel operates on the hanger through the linkage to engage and disengage the drilling fluid filter from the tubular drill string component. The mandrel may have a stationary portion comprising a first attachment to the open end of the perforated receptacle and a telescoping adjustable portion comprising a second attachment to the linkage. The mandrel may also comprise a top-hole interface for top-hole equipment.

  1. Subsurface drill string

    DOE Patents [OSTI]

    Casper, William L. (Rigby, ID); Clark, Don T. (Idaho Falls, ID); Grover, Blair K. (Idaho Falls, ID); Mathewson, Rodney O. (Idaho Falls, ID); Seymour, Craig A. (Idaho Falls, ID)

    2008-10-07

    A drill string comprises a first drill string member having a male end; and a second drill string member having a female end configured to be joined to the male end of the first drill string member, the male end having a threaded portion including generally square threads, the male end having a non-threaded extension portion coaxial with the threaded portion, and the male end further having a bearing surface, the female end having a female threaded portion having corresponding female threads, the female end having a non-threaded extension portion coaxial with the female threaded portion, and the female end having a bearing surface. Installation methods, including methods of installing instrumented probes are also provided.

  2. While drilling system and method

    DOE Patents [OSTI]

    Mayes, James C.; Araya, Mario A.; Thorp, Richard Edward

    2007-02-20

    A while drilling system and method for determining downhole parameters is provided. The system includes a retrievable while drilling tool positionable in a downhole drilling tool, a sensor chassis and at least one sensor. The while drilling tool is positionable in the downhole drilling tool and has a first communication coupler at an end thereof. The sensor chassis is supported in the drilling tool. The sensor chassis has a second communication coupler at an end thereof for operative connection with the first communication coupler. The sensor is positioned in the chassis and is adapted to measure internal and/or external parameters of the drilling tool. The sensor is operatively connected to the while drilling tool via the communication coupler for communication therebetween. The sensor may be positioned in the while drilling tool and retrievable with the drilling tool. Preferably, the system is operable in high temperature and high pressure conditions.

  3. Characterization and removal of errors due to local magnetic anomalies in directional drilling Nathan Hancock*

    E-Print Network [OSTI]

    Characterization and removal of errors due to local magnetic anomalies in directional drilling of Geophysics, Colorado School of Mines Summary Directional drilling has evolved over the last few decades utilizes a technique known as magnetic Measurement While Drilling (MWD). Vector measurements of geomagnetic

  4. Development of MELCOR Input Techniques for High Temperature Gas-Cooled Reactor Analysis 

    E-Print Network [OSTI]

    Corson, James

    2011-08-08

    and other HTGRs. In the present study, new input techniques have been developed for MELCOR HTGR analysis. These new techniques include methods for modeling radiation heat transfer between solid surfaces in an HTGR, calculating fuel and cladding geometric...

  5. Finite Element Modeling of Drilling Using DEFORM

    E-Print Network [OSTI]

    Gardner, Joel D.; Dornfeld, David

    2006-01-01

    Vijayaraghavan, A. (2005), “Drilling of Fiber- ReinforcedFINITE ELEMENT MODELING OF DRILLING USING DEFORM J. Gardner,of Comprehensive Drilling Simulation Tool” ABSTRACT DEFORM-

  6. Deep Water Drilling to Catalyze the Global Drilling Fluids Market...

    Open Energy Info (EERE)

    Deep Water Drilling to Catalyze the Global Drilling Fluids Market Home > Groups > Renewable Energy RFPs John55364's picture Submitted by John55364(100) Contributor 13 May, 2015 -...

  7. Neutron capture strategy and technique developments for GNEP

    SciTech Connect (OSTI)

    Couture, Aaron Joseph

    2008-01-01

    The initial three years of neutron capture measurements have been very successful in providing data for the Advanced Fuel Cycle Initiative/Global Nuclear Energy Partnership (AFCI/GNEP) program. Now that the most straightforward measurements have been completed, additional technical challenges face future measurements. In particular, techniques are needed to perform measurements that exhibit at least one of three major problems -- large fission:capture ratios, large capture:capture ratios, and high intrinsic activity samples. This paper will set forward a plan for attacking these technical challenges and moving forward with future measurements.

  8. Geothermal reservoir assessment based on slim hole drilling. Volume 1, Analytical Method: Final report

    SciTech Connect (OSTI)

    Olson, H.J.

    1993-12-01

    The Hawaii Scientific Observation Hole (SOH) program was supplied by the State of Hawaii to drill six, 4,000 foot scientific observation holes on Maui and the Big Island of Hawaii to confirm and stimulate geothermal, resource development in Hawaii. After a lengthy permitting process, three SOHs, totaling 18,890 feet of mostly core drilling were finally drilled along the Kilauea East Rift Zone (KERZ) in the Puna district on the Big Island. The SOH program was highly successful in meeting the highly restrictive permitting conditions imposed on the program, and in developing slim hole drilling techniques, establishing subsurface geological conditions, and initiating an assessment and characterization of the geothermal resources potential of Hawaii - even though permitting specifically prohibited pumping or flowing the holes to obtain data of subsurface fluid conditions. The first hole, SOH-4, reached a depth of 2,000 meters, recorded a bottom hole temperature of 306.1 C, and established subsurface thermal continuity along the KERZ between the HGP-A and the True/Mid-Pacific Geothermal Venture wells. Although evidence of fossil reservoir conditions were encountered, no zones with obvious reservoir potential were found. The second hole SOH-1, was drilled to a depth of 1,684 meters, recorded a bottom hole temperature of 206.1 C, effectively doubled the size of the Hawaii Geothermal Project -- Abbott/Puna Geothermal Venture (HGP-A/PGV) proven/probable reservoir, and defined the northern limit of the HGP-A/PGV reservoir. The final hole, SOH-2, was drilled to a depth of 2,073 meters, recorded a bottom hole temperature of 350.5 C, and has sufficient indicated permeability to be designated as a potential ''discovery.''

  9. Geothermal reservoir assessment based on slim hole drilling. Volume 2: Application in Hawaii: Final report

    SciTech Connect (OSTI)

    Olson, H.J.

    1993-12-01

    The Hawaii Scientific Observation Hole (SOH) program was planned, funded, and initiated in 1988 by the Hawaii Natural Energy Institute, an institute within the School of Ocean and Earth Science and Technology, at the University of Hawaii at Manoa. Initial funding for the SOH program was $3.25 million supplied by the State of Hawaii to drill six, 4,000 foot scientific observation holes on Maui and the Big Island of Hawaii to confirm and stimulate geothermal resource development in Hawaii. After a lengthy permitting process, three SOHs, totaling 18,890 feet of mostly core drilling were finally drilled along the Kilauea East Rift Zone (KERZ) in the Puna district on the Big Island. The SOH program was highly successful in meeting the highly restrictive permitting conditions imposed on the program, and in developing slim hole drilling techniques, establishing subsurface geological conditions, and initiating an assessment and characterization of the geothermal resources potential of Hawaii - - even though permitting specifically prohibited pumping or flowing the holes to obtain data of subsurface fluid conditions. The first hole, SOH-4, reached a depth of 2,000 meters, recorded a/bottom hole temperature of 306.1 C, and established subsurface thermal continuity along the KERZ between the HGP-A and the True/Mid-Pacific Geothermal Venture wells. Although evidence of fossil reservoir conditions were encountered, no zones with obvious reservoir potential were found. The second hole SOH-1, was drilled to a depth of 1,684 meters, recorded a bottom hole temperature of 206.1 C, effectively doubled the size of the Hawaii Geothermal Project-Abbott/Puna Geothermal Venture (HGP-A/PGV) proven/probable reservoir, and defined the northern limit of the HGP-A/PGV reservoir. The final hole, SOH-2, was drilled to a depth of 2,073 meters, recorded a bottom hole temperature of 350.5 C, and has sufficient indicated permeability to be designated as a potential discovery.

  10. Abstract--Twist drills are geometrical complex tools and thus various researchers have adopted different mathematical and

    E-Print Network [OSTI]

    Aristomenis, Antoniadis

    Abstract--Twist drills are geometrical complex tools and thus various researchers have adopted, drilling simulations are carried out. The developed DRILL3D software routine, creates parametrically for all the relevant data involved (drilling tool, cut workpiece, undeformed chip). The final data derived

  11. Support for Offshore Oil and Gas Drilling among the California Public

    E-Print Network [OSTI]

    Smith, Eric R.A.N.

    2003-01-01

    005 "Support for Offshore Oil and Gas Drilling Among theof support for more oil and gas development by RepublicansSupport for Offshore Oil and Gas Drilling among the

  12. Thermoporoelastic Effects of Drilling Fluid Temperature on Rock Drillability at Bit/Formation Interface 

    E-Print Network [OSTI]

    Thepchatri, Kritatee 1984-

    2012-10-26

    fluid and the downhole formation. It is critical for drilling engineers to understand this thermal impact to optimize their drilling plans. This thesis develops a numerical model using partially coupled thermoporoelasticity to study the effects...

  13. Development Drilling | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (UtilityInstruments IncMississippi:DeltaFishDesertDetroitSolar

  14. A Real-Time Decision Support System for High Cost Oil-Well Drilling Operations

    E-Print Network [OSTI]

    Aamodt, Agnar

    A Real-Time Decision Support System for High Cost Oil-Well Drilling Operations Odd Erik Gundersen and development cost in addition to two case studies are documented. Introduction DrillEdge is a software system for how to handle the current situation. Verdande Technology has developed DrillEdge to reduce the cost

  15. Los Alamos develops new technique for growing high-efficiency...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (505) 667-0471 Email "These perovskite crystals offer promising routes for developing low-cost, solar-based, clean global energy solutions for the future," said Aditya Mohite....

  16. Cranial Drilling Tool with Retracting Drill Bit Upon Skull Penetration

    E-Print Network [OSTI]

    Cranial Drilling Tool with Retracting Drill Bit Upon Skull Penetration Paul Loschak1 , Kechao Xiao1 billion in costs [1]. 275,000 of those injured annually are hospitalized and 52,000 will eventually die is required to perform the drilling w devices on the market. Although frequent monitoring has been correlated

  17. Combination drilling and skiving tool

    DOE Patents [OSTI]

    Stone, William J. (Kansas City, MO)

    1989-01-01

    A combination drilling and skiving tool including a longitudinally extending hollow skiving sleeve slidably and concentrically mounted on a right-handed twist drill. Dogs or pawls provided on the internal periphery of the skiving sleeve engage with the helical grooves of the drill. During a clockwise rotation of the tool, the drill moves downwardly and the sleeve translates upwardly, so that the drill performs a drilling operation on a workpiece. On the other hand, the drill moves upwardly and the sleeve translates downwardly, when the tool is rotated in a counter-clockwise direction, and the sleeve performs a skiving operation. The drilling and skiving operations are separate, independent and exclusive of each other.

  18. Technical and economical feasibility of coiled tubing drilling

    SciTech Connect (OSTI)

    Gary, S.C.; Doremus, D.M.

    1995-12-31

    The technique for evaluating coiled tubing (CT) drilling prospects is described. The technical and economic factors involved are discussed using a flowchart to guide the operator in the decision making process. In the technical analysis, the parameters limiting the feasibility of using CT for a given drilling project are reviewed. These parameters include CT tension, helical buckling which limits the weight on bit (WOB) and the horizontal reach, CT collapse pressure when drilling underbalanced, CT fatigue, and the usual hydraulic parameters such as annular velocity and pumping pressure. In today`s business environment, some projects, while technically feasible, may not be economically feasible. In the economic analysis, the competitiveness of each CT drilling application versus conventional solutions is evaluated, and factors such as project duration and equipment use are reviewed. The equipment normally required for a CT drilling job and the costs associated with mobilizing this equipment are discussed.

  19. Advanced Seismic While Drilling System

    SciTech Connect (OSTI)

    Robert Radtke; John Fontenot; David Glowka; Robert Stokes; Jeffery Sutherland; Ron Evans; Jim Musser

    2008-06-30

    A breakthrough has been discovered for controlling seismic sources to generate selectable low frequencies. Conventional seismic sources, including sparkers, rotary mechanical, hydraulic, air guns, and explosives, by their very nature produce high-frequencies. This is counter to the need for long signal transmission through rock. The patent pending SeismicPULSER{trademark} methodology has been developed for controlling otherwise high-frequency seismic sources to generate selectable low-frequency peak spectra applicable to many seismic applications. Specifically, we have demonstrated the application of a low-frequency sparker source which can be incorporated into a drill bit for Drill Bit Seismic While Drilling (SWD). To create the methodology of a controllable low-frequency sparker seismic source, it was necessary to learn how to maximize sparker efficiencies to couple to, and transmit through, rock with the study of sparker designs and mechanisms for (a) coupling the sparker-generated gas bubble expansion and contraction to the rock, (b) the effects of fluid properties and dynamics, (c) linear and non-linear acoustics, and (d) imparted force directionality. After extensive seismic modeling, the design of high-efficiency sparkers, laboratory high frequency sparker testing, and field tests were performed at the University of Texas Devine seismic test site. The conclusion of the field test was that extremely high power levels would be required to have the range required for deep, 15,000+ ft, high-temperature, high-pressure (HTHP) wells. Thereafter, more modeling and laboratory testing led to the discovery of a method to control a sparker that could generate low frequencies required for deep wells. The low frequency sparker was successfully tested at the Department of Energy Rocky Mountain Oilfield Test Center (DOE RMOTC) field test site in Casper, Wyoming. An 8-in diameter by 26-ft long SeismicPULSER{trademark} drill string tool was designed and manufactured by TII. An APS Turbine Alternator powered the SeismicPULSER{trademark} to produce two Hz frequency peak signals repeated every 20 seconds. Since the ION Geophysical, Inc. (ION) seismic survey surface recording system was designed to detect a minimum downhole signal of three Hz, successful performance was confirmed with a 5.3 Hz recording with the pumps running. The two Hz signal generated by the sparker was modulated with the 3.3 Hz signal produced by the mud pumps to create an intense 5.3 Hz peak frequency signal. The low frequency sparker source is ultimately capable of generating selectable peak frequencies of 1 to 40 Hz with high-frequency spectra content to 10 kHz. The lower frequencies and, perhaps, low-frequency sweeps, are needed to achieve sufficient range and resolution for realtime imaging in deep (15,000 ft+), high-temperature (150 C) wells for (a) geosteering, (b) accurate seismic hole depth, (c) accurate pore pressure determinations ahead of the bit, (d) near wellbore diagnostics with a downhole receiver and wired drill pipe, and (e) reservoir model verification. Furthermore, the pressure of the sparker bubble will disintegrate rock resulting in an increased overall rates of penetration. Other applications for the SeismicPULSER{trademark} technology are to deploy a low-frequency source for greater range on a wireline for Reverse Vertical Seismic Profiling (RVSP) and Cross-Well Tomography. Commercialization of the technology is being undertaken by first contacting stakeholders to define the value proposition for rig site services utilizing SeismicPULSER{trademark} technologies. Stakeholders include national oil companies, independent oil companies, independents, service companies, and commercial investors. Service companies will introduce a new Drill Bit SWD service for deep HTHP wells. Collaboration will be encouraged between stakeholders in the form of joint industry projects to develop prototype tools and initial field trials. No barriers have been identified for developing, utilizing, and exploiting the low-frequency SeismicPULSER{trademark} source in a

  20. Proposed Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

  1. Proposed Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2013-06-28

    Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

  2. November 2002 OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    November 2002 OCEAN DRILLING PROGRAM LEG 208 SCIENTIFIC PROSPECTUS EARLY CENOZOIC EXTREME CLIMATES -------------------------------- Dr. Jack Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University Leg Project Manager and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery

  3. Development of Improved Caprock Integrity and Risk Assessment Techniques

    SciTech Connect (OSTI)

    Bruno, Michael

    2014-09-30

    GeoMechanics Technologies has completed a geomechanical caprock integrity analysis and risk assessment study funded through the US Department of Energy. The project included: a detailed review of historical caprock integrity problems experienced in the natural gas storage industry; a theoretical description and documentation of caprock integrity issues; advanced coupled transport flow modelling and geomechanical simulation of three large-scale potential geologic sequestration sites to estimate geomechanical effects from CO? injection; development of a quantitative risk and decision analysis tool to assess caprock integrity risks; and, ultimately the development of recommendations and guidelines for caprock characterization and CO? injection operating practices. Historical data from gas storage operations and CO? sequestration projects suggest that leakage and containment incident risks are on the order of 10-1 to 10-2, which is higher risk than some previous studies have suggested for CO?. Geomechanical analysis, as described herein, can be applied to quantify risks and to provide operating guidelines to reduce risks. The risk assessment tool developed for this project has been applied to five areas: The Wilmington Graben offshore Southern California, Kevin Dome in Montana, the Louden Field in Illinois, the Sleipner CO? sequestration operation in the North Sea, and the In Salah CO? sequestration operation in North Africa. Of these five, the Wilmington Graben area represents the highest relative risk while the Kevin Dome area represents the lowest relative risk.

  4. Ultra-Deep Drilling Cost Reduction; Design and Fabrication of an Ultra-Deep Drilling Simulator (UDS)

    SciTech Connect (OSTI)

    Lindstrom, Jason

    2010-01-31

    Ultra-deep drilling, below about 20,000 ft (6,096 m), is extremely expensive and limits the recovery of hydrocarbons at these depths. Unfortunately, rock breakage and cuttings removal under these conditions is not understood. To better understand and thus reduce cost at these conditions an ultra-deep single cutter drilling simulator (UDS) capable of drill cutter and mud tests to sustained pressure and temperature of 30,000 psi (207 MPa) and 482 °F (250 °C), respectively, was designed and manufactured at TerraTek, a Schlumberger company, in cooperation with the Department of Energy’s National Energy Technology Laboratory. UDS testing under ultra-deep drilling conditions offers an economical alternative to high day rates and can prove or disprove the viability of a particular drilling technique or fluid to provide opportunity for future domestic energy needs.

  5. Drilling subsurface wellbores with cutting structures

    DOE Patents [OSTI]

    Mansure, Arthur James (Alburquerque, NM); Guimerans, Rosalvina Ramona (The Woodlands, TX)

    2010-11-30

    A system for forming a wellbore includes a drill tubular. A drill bit is coupled to the drill tubular. One or more cutting structures are coupled to the drill tubular above the drill bit. The cutting structures remove at least a portion of formation that extends into the wellbore formed by the drill bit.

  6. Unique aspects of drilling and completing hot-dry-rock geothermal wells

    SciTech Connect (OSTI)

    Carden, R.S.; Nicholson, R.W.; Pettitt, R.A.; Rowley, J.C.

    1983-01-01

    Drilling operations at the Fenton Hill Hot Dry Rock (HDR) Geothermal Test Site have led to numerous developments needed to solve the problems caused by a very harsh downhole environment. A pair of deep wells were drilled to approximately 15,000 ft (4.6 km); formation temperatures were in excess of 600/sup 0/F (300/sup 0/C). The wells were directionally drilled, inclined at 35/sup 0/, one above the other, in a direction orthogonal to the least principal stress field. The well site is near the flank of a young silicic composite volcano in the Jemez Mountains of northern New Mexico. The completion of this pair of wells is unique in reservoir development. The lower well was planned as a cold water injector which will be cooled by the introduced water from the static geothermal gradient to about 80/sup 0/F (25/sup 0/C). The upper well will be heated during production to over 500/sup 0/F (250/sup 0/C). The well pair is designed to perform as a closed loop heat-extraction system connected by hydraulic fractures with a vertical spacing of 1200 ft between the wells. These conditions strongly constrain the drilling technique, casing design, cement formulation, and cementing operations.

  7. Crosswell Imaging Technology & Advanced DSR Navigation for Horizontal Directional Drilling

    SciTech Connect (OSTI)

    Larry Stolarczyk

    2008-08-08

    The objective of Phase II is to develop and demonstrate real-time measurement-while-drilling (MWD) for guidance and navigation of drill strings during horizontal drilling operations applicable to both short and long holes. The end product of Phase II is a functional drill-string assembly outfitted with a commercial version of Drill String Radar (DSR). Project Objectives Develop and demonstrate a dual-phase methodology of in-seam drilling, imaging, and structure confirmation. This methodology, illustrated in Figure 1, includes: (1) Using RIM to image between drill holes for seam thickness estimates and in-seam structures detection. Completed, February 2005; and (2) Using DSR for real-time MWD guidance and navigation of drillstrings during horizontal drilling operations. Completed, November 2008. As of November 2008, the Phase II portion of Contract DE-FC26-04NT42085 is about 99% complete, including milestones and tasks original outlined as Phase II work. The one percent deficiency results from MSHA-related approvals which have yet to be granted (at the time of reporting). These approvals are pending and are do not negatively impact the scope of work or project objectives.

  8. Field Testing of Environmentally Friendly Drilling System

    SciTech Connect (OSTI)

    David Burnett

    2009-05-31

    The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of the environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.

  9. Drill bit assembly for releasably retaining a drill bit cutter

    DOE Patents [OSTI]

    Glowka, David A. (Austin, TX); Raymond, David W. (Edgewood, NM)

    2002-01-01

    A drill bit assembly is provided for releasably retaining a polycrystalline diamond compact drill bit cutter. Two adjacent cavities formed in a drill bit body house, respectively, the disc-shaped drill bit cutter and a wedge-shaped cutter lock element with a removable fastener. The cutter lock element engages one flat surface of the cutter to retain the cutter in its cavity. The drill bit assembly thus enables the cutter to be locked against axial and/or rotational movement while still providing for easy removal of a worn or damaged cutter. The ability to adjust and replace cutters in the field reduces the effect of wear, helps maintains performance and improves drilling efficiency.

  10. Recent developments in instrumentation and bioinformatics show that the technique of synchrotron radiation circular

    E-Print Network [OSTI]

    Janes, Bob

    567 Recent developments in instrumentation and bioinformatics show that the technique conventional lab-based circular dichroism instruments. Addresses *School of Crystallography, Birkbeck College for protein studies are available at the Synchrotron Radiation Source (SRS; UK) (http

  11. Greening PCB Drilling Process: Burr Minimization and Other Strategies

    E-Print Network [OSTI]

    Huang, Yu-Chu; Linke, Barbara; Bhandari, Binayak; Ahn, Sung-Hoon; Dornfeld, David

    2011-01-01

    K. , “Influence of drill geometry on thrust force into process conditions and drill geometry, experiments werefeed, spindle speed and drill diameter. The Drilling Burr

  12. BOREHOLE DRILLING AND RELATED ACTIVITIES AT THE STRIPA MINE

    E-Print Network [OSTI]

    Kurfurst, P.J.

    2011-01-01

    Drilling Costs and Rates . . . • . . . • • . . . . , . .TABLES I. II. III. Costs of Core Drilling Per Meter. . . . .8-hour shifts. Drilling Costs and Rates Costs of drilling

  13. Laser-Mechanical Drilling for Geothermal Energy: Low-Contact Drilling Technology to Enable Economical EGS Wells

    SciTech Connect (OSTI)

    2010-01-15

    Broad Funding Opportunity Announcement Project: Foro Energy is developing a unique capability and hardware system to transmit high power lasers over long distances via fiber optic cables. This laser power is integrated with a mechanical drilling bit to enable rapid and sustained penetration of hard rock formations too costly to drill with mechanical drilling bits alone. The laser energy that is directed at the rock basically softens the rock, allowing the mechanical bit to more easily remove it. Foro Energy’s laser-assisted drill bits have the potential to be up to 10 times more economical than conventional hard-rock drilling technologies, making them an effective way to access the U.S. energy resources currently locked under hard rock formations.

  14. Odessa fabricator builds rig specifically for geothermal drilling

    Broader source: Energy.gov [DOE]

    For 35 years, MD Cowan has built drilling rigs, developing a market for its Super Single® rig for use in the nation's oil and gas fields. Now the Odessa-based company is branching out into alternative energy.

  15. Drilling Through Gas Hydrates Formations: Managing Wellbore Stability Risks 

    E-Print Network [OSTI]

    Khabibullin, Tagir R.

    2010-10-12

    As hydrocarbon exploration and development moves into deeper water and onshore arctic environments, it becomes increasingly important to quantify the drilling hazards posed by gas hydrates. To address these concerns, a 1D semi-analytical model...

  16. Stress analysis of a hybrid composite drilling riser 

    E-Print Network [OSTI]

    Sundstrom, Keith Andrew

    1996-01-01

    Methods to thoroughly and efficiently analyze a composite riser designed for use in offshore drilling applications and subjected to various types of loading have been developed. An axisymmetric finite element model allowing nonaxisymmetric...

  17. Evaluation of potential kick scenarios in riserless drilling 

    E-Print Network [OSTI]

    Seland, Stig

    1999-01-01

    In order to cope with the challenges the petroleum industry is faced with in deepwater exploration today, a Marine Riserless Drilling Joint Industry Project, MRDJIP, was formed. The main task for this project is to develop the technology neede...

  18. OCEAN DRILLING PROGRAM LEG 109 PRELIMINARY REPORT

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 109 PRELIMINARY REPORT BARE ROCK DRILLING IN THE MID-ATLANTIC RIDGE RIFT 109 Ocean Drilling Program Texas A & M University College Station, TX 77843-3469 Philip D. Rabinowitz Director Ocean Drilling Program Robert B. Kidd Manager of Science Operations Ocean Drilling Program Louis E

  19. Petroleum Engineering 225 Introduction to Drilling Systems

    E-Print Network [OSTI]

    engineering concepts, quantities and unit systems, drilling rig components, drilling fluids, pressure loss Publishing, 2011; Drilling Fluid Engineering Manual. Textbook prepared by M-I Drilling Fluids Co., 1998: terminology, types, dull grading and selection 6. Drilling fluids basics 7. Completion overview as it relates

  20. Transducer for downhole drilling components

    DOE Patents [OSTI]

    Hall, David R; Fox, Joe R

    2006-05-30

    A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. The transmission element may include an annular housing forming a trough, an electrical conductor disposed within the trough, and an MCEI material disposed between the annular housing and the electrical conductor.

  1. Microhole Wireless Steering While Drilling System

    SciTech Connect (OSTI)

    John Macpherson; Thomas Gregg

    2007-12-31

    A background to Coiled Tubing Bottom Hole Assemblies (CT-BHA) is given, and the development of a bi-directional communications and power module (BCPM)component is described. The successful operation of this component in both the laboratory and field environment is described. The primary conclusion of this development is that the BCPM component operates as anticipated within the CT-BHA, and significantly extends the possibility of drilling with coiled tubing in the microhole environment.

  2. Subsea well template for directional drilling

    SciTech Connect (OSTI)

    Goldsmith, R.G.

    1988-07-05

    A method is described for drilling widely spaced boreholes into a hydrocarbon producing subsea formation comprising the steps of: positioning a subsea drilling template on the bottom of a body of water, the subsea drilling template including laterally disposed, substantially cylindrical drilling guides having a longitudinal axis wherein at least one of the drilling guides has its longitudinal axis disposed at an angle of less than 90/sup 0/ relative to a horizontal plane passing through the subsea drilling template; mooring a drilling vessel floating on the surface of the body of water in a first position relative to the subsea drilling template using a plurality of mooring catenaries; extending a drill string from the floating vessel to the subsea template, the drill string passing into the one of the drilling guides along its longitudinal axis which is disposed at an angle of less than 90/sup 0/; drilling a borehole below the template into the hydrocarbon producing subsea formation; repositioning the drilling vessel to another position relative to the subsea template by adjusting the mooring catenaries; extending the drill string from the vessel into another of the drilling guides; drilling another borehole below the template; and repeating the steps of repositioning the drilling vessel, extending the drill string and drilling the widely spaced boreholes.

  3. rillEdge is a software system that provides real-time deci-sion support when drilling oil wells. Decisions are sup-

    E-Print Network [OSTI]

    Aamodt, Agnar

    developed DrillEdge to reduce the cost and decrease the probability of fail- ures in oil well drilling-Time Decision Support System for High Cost Oil Well Drilling Operations Odd Erik Gundersen, Frode Sørmo, AgnarD rillEdge is a software system that provides real-time deci- sion support when drilling oil wells

  4. Recent developments in the techniques of controlling and measuring suction in unsaturated soils

    E-Print Network [OSTI]

    Delage, Pierre; Tarantino, Alessandro

    2008-01-01

    The difficulty of measuring and controlling suction in unsaturated soils is one of the reasons why the development of the mechanics of unsaturated soils has not been as advanced as that of saturated soils. However, significant developments have been carried out in the last decade in this regard. In this paper, a re-view of some developments carried out in the techniques of controlling suction by using the axis translation, the osmotic method and the vapour control technique is presented. The paper also deals with some recent de-velopments in the direct measurement of suction by using high capacity tensiometers and in the measurement of high suction by using high range psychrometers. The recent progresses made in these techniques have been significant and will certainly help further experimental investigation of the hydromechanical behaviour of un-saturated soils.

  5. Drill no Tetsujin: Communicative na Drill kara Role-play e (The Expert of Drills: From Communicative Drills to Role-Plays)

    E-Print Network [OSTI]

    Torii-Williams, Eiko

    1998-01-01

    Kyooshi no Tebiki: Syokyuu Drill no Tsukurikata (A Guide forBonjin-sha. to Construct Drills for the Beginning Level).Okazaki & Okazaki, 1990). Drill language teaching. tive. no

  6. Relating horsepower to drilling productivity

    SciTech Connect (OSTI)

    Givens, R.; Williams, G.; Wingfield, B.

    1996-12-31

    Many technological advancements have been made in explosive products and applications over the last 15 years resulting in productivity and cost gains. However, the application of total energy (engine horsepower) in the majority of rotary drilling technology, has remained virtually unchanged over that period. While advancements have been made in components, efficiency, and types of hydraulic systems used on drills, the application of current hydraulic technology to improve drilling productivity has not been interactive with end users. This paper will investigate how traditional design assumptions, regarding typical application of horsepower in current rotary drill systems, can actually limit productivity. It will be demonstrated by numeric analysis how changing the partitioning of available hydraulic energy can optimize rotary drill productivity in certain conditions. Through cooperative design ventures with drill manufacturers, increased penetration rates ranging from 20% to 100% have been achieved. Productivity was increased initially on some rigs by careful selection of optional hydraulic equipment. Additional gains were made in drilling rates by designing the rotary hydraulic circuit to meet the drilling energies predicted by computer modeling.

  7. Further Development at JET of Remote Digital Photogrammetry Techniques and Remote Welding Under Conditions of Restricted Access

    E-Print Network [OSTI]

    Further Development at JET of Remote Digital Photogrammetry Techniques and Remote Welding Under Conditions of Restricted Access

  8. OM300 Direction Drilling Module

    SciTech Connect (OSTI)

    MacGugan, Doug

    2013-08-22

    OM300 – Geothermal Direction Drilling Navigation Tool: Design and produce a prototype directional drilling navigation tool capable of high temperature operation in geothermal drilling Accuracies of 0.1° Inclination and Tool Face, 0.5° Azimuth Environmental Ruggedness typical of existing oil/gas drilling Multiple Selectable Sensor Ranges High accuracy for navigation, low bandwidth High G-range & bandwidth for Stick-Slip and Chirp detection Selectable serial data communications Reduce cost of drilling in high temperature Geothermal reservoirs Innovative aspects of project Honeywell MEMS* Vibrating Beam Accelerometers (VBA) APS Flux-gate Magnetometers Honeywell Silicon-On-Insulator (SOI) High-temperature electronics Rugged High-temperature capable package and assembly process

  9. Drills and Classes | Department of Energy

    Energy Savers [EERE]

    Drills and Classes Drills and Classes As part of the continuing effort to provide a safer workplace, the Headquarters Occupant Emergency Planning Team is pleased to announce that...

  10. Directional Drilling Systems | Open Energy Information

    Open Energy Info (EERE)

    Directional Drilling Systems Jump to: navigation, search Geothermal ARRA Funded Projects for Directional Drilling Systems Loading map... "format":"googlemaps3","type":"ROADMAP","t...

  11. Superhard nanophase cutter materials for rock drilling applications

    SciTech Connect (OSTI)

    Voronov, O.; Tompa, G.; Sadangi, R.; Kear, B.; Wilson, C.; Yan, P.

    2000-06-23

    The Low Pressure-High Temperature (LPHT) System has been developed for sintering of nanophase cutter and anvil materials. Microstructured and nanostructured cutters were sintered and studied for rock drilling applications. The WC/Co anvils were sintered and used for development of High Pressure-High Temperature (HPHT) Systems. Binderless diamond and superhard nanophase cutter materials were manufactured with help of HPHT Systems. The diamond materials were studied for rock machining and drilling applications. Binderless Polycrystalline Diamonds (BPCD) have high thermal stability and can be used in geothermal drilling of hard rock formations. Nanophase Polycrystalline Diamonds (NPCD) are under study in precision machining of optical lenses. Triphasic Diamond/Carbide/Metal Composites (TDCC) will be commercialized in drilling and machining applications.

  12. EVALUATION OF ROOF BOLTING REQUIREMENTS BASED ON IN-MINE ROOF BOLTER DRILLING

    SciTech Connect (OSTI)

    Syd S. Peng

    2001-04-15

    In this quarter, the research effort is to develop the drill control unit (DCU) that acquire, store drilling parameters and control the drilling operation. The relevant publications have been reviewed and the methodology developed by previous researchers has been evaluated using the collected data in our laboratory and field tests conducted prior to the start of this project. Numerical modeling for exploring roof bolting mechanism has been started.

  13. The development of in situ fracture toughness evaluation techniques in hydrogen environment

    SciTech Connect (OSTI)

    Wang, Jy-An John; Ren, Fei; Tan, Ting; Liu, Ken C

    2014-01-01

    Fracture behavior and fracture toughness are of great interest regarding reliability of hydrogen pipelines and storage tanks, however, many conventional fracture testing techniques are difficult to be realized under the presence of hydrogen, in addition to the inherited specimen size effect. Thus it is desired to develop novel in situ fracture toughness evaluation techniques to study the fracture behavior of structural materials in hydrogen environments. In this study, a torsional fixture was developed to utilize an emerging fracture testing technique, Spiral Notch Torsion Test (SNTT). The in situ testing results indicated that the exposure to H2 significantly reduces the fracture toughness of 4340 high strength steels by up to 50 percent. Furthermore, SNTT tests conducted in air demonstrated a significant fracture toughness reduction in samples subject to simulated welding heat treatment using Gleeble, which illustrated the effect of welding on the fracture toughness of this material.

  14. Development of quick repairing technique for ceramic burner in hot stove of blast furnace

    SciTech Connect (OSTI)

    Kondo, Atsushi; Doura, Kouji; Nakamura, Hirofumi [Sumitomo Metal Industries, Ltd., Wakayama (Japan). Wakayama Steel Works

    1997-12-31

    Refractories of ceramic burner in hot stoves at Wakayama No. 4 blast furnace were damaged. There are only three hot stoves, so repairing must be done in a short. Therefore, a quick repairing technique for ceramic burners has been developed, and two ceramic burners were repaired in just 48 hours.

  15. Smaller Footprint Drilling System for Deep and Hard Rock Environments; Feasibility of Ultra-High-Speed Diamond Drilling

    SciTech Connect (OSTI)

    TerraTek, A Schlumberger Company

    2008-12-31

    The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill 'faster and deeper' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energy and loads. The significance of the 'ultra-high rotary speed drilling system' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm - usually well below 5,000 rpm. This document provides the progress through two phases of the program entitled 'Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling' for the period starting 30 June 2003 and concluding 31 March 2009. The accomplishments of Phases 1 and 2 are summarized as follows: (1) TerraTek reviewed applicable literature and documentation and convened a project kick-off meeting with Industry Advisors in attendance (see Black and Judzis); (2) TerraTek designed and planned Phase I bench scale experiments (See Black and Judzis). Improvements were made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs were developed to provided a more consistent product with consistent performance. A test matrix for the final core bit testing program was completed; (3) TerraTek concluded small-scale cutting performance tests; (4) Analysis of Phase 1 data indicated that there is decreased specific energy as the rotational speed increases; (5) Technology transfer, as part of Phase 1, was accomplished with technical presentations to the industry (see Judzis, Boucher, McCammon, and Black); (6) TerraTek prepared a design concept for the high speed drilling test stand, which was planned around the proposed high speed mud motor concept. Alternative drives for the test stand were explored; a high speed hydraulic motor concept was finally used; (7) The high speed system was modified to accommodate larger drill bits than originally planned; (8) Prototype mud turbine motors and the high speed test stand were used to drive the drill bits at high speed; (9) Three different rock types were used during the testing: Sierra White granite, Crab Orchard sandstone, and Colton sandstone. The drill bits used included diamond impregnated bits, a polycrystalline diamond compact (PDC) bit, a thermally stable PDC (TSP) bit, and a hybrid TSP and natural diamond bit; and (10) The drill bits were run at rotary speeds up to 5500 rpm and weight on bit (WOB) to 8000 lbf. During Phase 2, the ROP as measured in depth of cut per bit revolution generally increased with increased WOB. The performance was mixed with increased rotary speed, with the depth cut with the impregnated drill bit generally increasing and the TSP and hybrid TSP drill bits generally decreasing. The ROP in ft/hr generally increased with all bits with increased WOB and rotary speed. The mechanical specific energy generally improved (decreased) with increased WOB and was mixed with increased rotary speed.

  16. Long-Term Monitoring of a Drilled Shaft Retaining Wall in Expansive Clay: Behavior Before and During Excavation

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Long-Term Monitoring of a Drilled Shaft Retaining Wall in Expansive Clay: Behavior Before are that the instrumentation survived construction and is working, residual stresses developed in the drilled shafts prior The motivation for this work is uncertainty in the design of drilled shaft retaining walls in expansive clay

  17. Bent-housing turbodrills improve hard-formation directional drilling

    SciTech Connect (OSTI)

    Koot, L.; Koole, K. (Shell U.K. Exploration and Production, Lowestoft (United Kingdom)); Gaynor, T. (Neyrfor-Weir Ltd., Aberdeen (United Kingdom))

    1993-02-15

    Improvements in the design of turbine-powered downhole motors allowed steerable drilling in a hard formation at a high rate of penetration (ROP). Drilling in this dolomite formation with the rotary or with positive-displacement motors (PDMs) was slow during steering operations. Shell's solution to the steering penetration rate problems was to change the well plans if suitable directional drilling tools weren't available. Where possible, the wells were designed with the Zechstein interval drilled as a tangent section with non-steerable turbodrills. However, a better solution was the use of a steerable turbodrill-a tool unavailable on the market at that time. The paper describes motor development, a field test, and the design and operation of the motor.

  18. A dynamic model for underbalanced drilling with coiled tubing

    SciTech Connect (OSTI)

    Rommetveit, R.; Vefring, E.H.; Wang, Z.; Bieseman, T.; Faure, A.M.

    1995-11-01

    A model for underbalanced drilling with coiled tubing has been developed which takes into account all important factors contributing to the process. This model is a unique tool to plan and execute underbalanced or near balance drilling operations. It is a transient, one-dimensional multi-phase flow model with the following components: Lift gas system model, multiphase hydraulics model, reservoir-wellbore interaction model, drilling model, models for multiphase fluids (lift gas, produced gas, mud, foam, produced gas, oil, water and cuttings). Various alternative geometries for gas injection are modeled as well as all important operations during underbalanced drilling with coiled tubing. The model as well as some simulation results for its use are presented in this paper.

  19. Standard Operating Procedure (SOP) Drill Press

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Standard Operating Procedure (SOP) ­ Drill Press · Know the location of start and stop switches or buttons and keep the drill press table free of tools and other materials. · Use only properly sharpened while the drill press is in motion. · Do not insert a drill chuck key into the chuck until the power

  20. INSTRUCTIONS INTEGRATED OCEAN DRILLING PROGRAM (IODP)

    E-Print Network [OSTI]

    INSTRUCTIONS FOR THE INTEGRATED OCEAN DRILLING PROGRAM (IODP) MANUSCRIPT AND PHOTOGRAPH COPYRIGHT, Integrated Ocean Drilling Program, 1000 Discovery Drive, College Station, Texas 77845, USA A signed copyright of the Integrated Ocean Drilling Program or any other publications of the Integrated Ocean Drilling Program. Author

  1. OCEAN DRILLING PROGRAM LEG 200 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 200 SCIENTIFIC PROSPECTUS DRILLING AT THE H2O LONG-TERM SEAFLOOR Director of Science Operations Ocean Drilling Program Texas A&M University 1000 Discovery Drive College Ocean Drilling Program Texas A&M University 1000 Discovery Drive College Station TX 77845-9547 USA

  2. OCEAN DRILLING PROGRAM LEG 196 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 196 SCIENTIFIC PROSPECTUS LOGGING WHILE DRILLING AND ADVANCED CORKS Deputy Director of Science Operations Ocean Drilling Program Texas A&M University 1000 Discovery Drive Scientist Ocean Drilling Program Texas A&M University 1000 Discovery Drive College Station TX 77845-9547 USA

  3. OCEAN DRILLING PROGRAM LEG 192 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 192 SCIENTIFIC PROSPECTUS BASEMENT DRILLING OF THE ONTONG JAVA PLATEAU of Science Operations Ocean Drilling Program Texas A&M University 1000 Discovery Drive College Station, TX Drilling Program Texas A&M University 1000 Discovery Drive College Station, TX 77845-9547 U.S.A. May 2000

  4. OCEAN DRILLING PROGRAM LEG 104 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 104 SCIENTIFIC PROSPECTUS NORWEGIAN SEA Olav Eldholm Co-Chief Scientist Ocean Drilling Program Texas A & M University College Station, Texas 77843-3469 Pni±ip o Rabinowitz Director Ocean Drilling Program Robert B Kidd Manager of Science Operations Ocean Drilling Program Louis E

  5. OCEAN DRILLING PROGRAM LEG 179 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 179 SCIENTIFIC PROSPECTUS HAMMER DRILLING and NERO Dr. Jack Casey Chief.S.A. Tom Pettigrew Chief Engineer, Leg 179 Ocean Drilling Program Texas A&M University Research Park 1000 Drilling Program Texas A&M University Research Park 1000 Discovery Drive College Station, Texas 77845

  6. OCEAN DRILLING PROGRAM LEG 106 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Drilling Program, Texas A & M University, College Station, Texas 77843-3469, as well as appropriateOCEAN DRILLING PROGRAM LEG 106 SCIENTIFIC PROSPECTUS BARE ROCK DRILLING IN THE KANE FRACTURE ZONE Drilling Program Texas A & M University College Station, TX 77843-3469

  7. REVISED HYDROGEN SULFIDE DRILLING CONTINGENCY PLAN

    E-Print Network [OSTI]

    REVISED HYDROGEN SULFIDE DRILLING CONTINGENCY PLAN OCEAN DRILLING PROGRAM TEXAS A&M UNIVERSITY;PREFACE Attached is the "REVISED HYDROGEN SULFIDE DRILLING CONTINGENCY PLAN" that will be used for ODP coring and drilling operations on legs where hydrogen sulfide is likely to be encountered. Prior

  8. Lateral drilling and completion technologies for shallow-shelf carbonates of the Red River and Ratcliffe Formations, Williston Basin. Topical report, July 1997

    SciTech Connect (OSTI)

    Carrell, L.A.; George, R.D.; Gibbons, D.

    1998-07-01

    Luff Exploration Company (LEC) focused on involvement in technologies being developed utilizing horizontal drilling concepts to enhance oil-well productivity starting in 1992. Initial efforts were directed toward high-pressure lateral jetting techniques to be applied in existing vertical wells. After involvement in several failed field attempts with jetting technologies, emphasis shifted to application of emerging technologies for drilling short-radius lateral in existing wellbores and medium-radius technologies in new wells. These lateral drilling technologies were applied in the Mississippi Ratcliffe and Ordovician Red River formations at depths of 2,590 to 2,890 m in Richland County, MT; Bowman County, ND; and Harding County, SD. In theory, all of the horizontal drilling techniques explored in this project have merit for application fitting specific criteria. From a realistic point of view, the only relatively trouble-free, adequately-proven technology employed was the medium-radius steered motor/MWD technology. The slim-tool steered motor/MWD re-entry technology has been used extensively but appears to still be significantly in developmental stages. This technology will probably always be more troublesome than the technology used to drill new wells because the smaller diameter required for the tools contributes to both design and operational complexities. Although limited mechanical success has been achieved with some of the lateral jetting technologies and the Amoco tools, their predictability and reliability is unproven. Additionally, they appear to be limited to shallow depths and certain rock types. The Amoco technology probably has the most potential to be successfully developed for routinely reliable, field applications. A comparison of the various horizontal drilling technologies investigated is presented.

  9. Geothermal drilling in Cerro Prieto

    SciTech Connect (OSTI)

    Dominguez A., Bernardo

    1982-08-10

    The number of characteristics of the different wells that have been drilled in the Cerro Prieto geothermal field to date enable one to summarize the basic factors in the applied technology, draw some conclusions, improve systems and procedures, and define some problems that have not yet been satisfactorily solved, although the existing solution is the best now available. For all practical purposes, the 100 wells drilled in the three areas or blocks into which the Cerro Prieto field has been divided have been completed. Both exploratory and production wells have been drilled; problems of partial or total lack of control have made it necessary to abandon some of these wells, since they were unsafe to keep in production or even to be used for observation and/or study. The wells and their type, the type of constructed wells and the accumulative meters that have been drilled for such wells are summarized.

  10. Recommendations of the workshop on advanced geothermal drilling systems

    SciTech Connect (OSTI)

    Glowka, D.A.

    1997-12-01

    At the request of the U.S. Department of Energy, Office of Geothermal Technologies, Sandia National Laboratories convened a group of drilling experts in Berkeley, CA, on April 15-16, 1997, to discuss advanced geothermal drilling systems. The objective of the workshop was to develop one or more conceptual designs for an advanced geothermal drilling system that meets all of the criteria necessary to drill a model geothermal well. The drilling process was divided into ten essential functions. Each function was examined, and discussions were held on the conventional methods used to accomplish each function and the problems commonly encountered. Alternative methods of performing each function were then listed and evaluated by the group. Alternative methods considered feasible or at least worth further investigation were identified, while methods considered impractical or not potentially cost-saving were eliminated from further discussion. This report summarizes the recommendations of the workshop participants. For each of the ten functions, the conventional methods, common problems, and recommended alternative technologies and methods are listed. Each recommended alternative is discussed, and a description is given of the process by which this information will be used by the U.S. DOE to develop an advanced geothermal drilling research program.

  11. Technique development for field inspection of cracking in seam welded ducts

    SciTech Connect (OSTI)

    Shell, Eric B.; Benson, Craig [Wyle Laboratories, Inc., Dayton, OH 45440 (United States); Liljestrom, Greg C.; Shanahan, Stephen [Wyle Laboratories, Inc., Oklahoma City, OK 73110 (United States)

    2014-02-18

    The resistance seam weld interfaces between alloyed and pure titanium are an in service concern due to precipitation of titanium hydride and resulting embrittlement and cracking. Several inspection techniques were developed and evaluated for field use to characterize the damage in the fleet. Electromagnetic, ultrasonic, florescent penetrant, thermographic, and radiographic techniques were considered. The ultrasonic and electromagnetic approaches were both found suitable. However, the electromagnetic approach is more desirable for field inspections, due to consistency and ease of use. The electromagnetic inspection procedure is able to discriminate between precursor damage and through cracking with sufficient sensitivity to small cracks.

  12. Rotary steerable motor system for underground drilling

    DOE Patents [OSTI]

    Turner, William E. (Durham, CT); Perry, Carl A. (Middletown, CT); Wassell, Mark E. (Kingwood, TX); Barbely, Jason R. (Middletown, CT); Burgess, Daniel E. (Middletown, CT); Cobern, Martin E. (Cheshire, CT)

    2010-07-27

    A preferred embodiment of a system for rotating and guiding a drill bit in an underground bore includes a drilling motor and a drive shaft coupled to drilling motor so that drill bit can be rotated by the drilling motor. The system further includes a guidance module having an actuating arm movable between an extended position wherein the actuating arm can contact a surface of the bore and thereby exert a force on the housing of the guidance module, and a retracted position.

  13. Rotary steerable motor system for underground drilling

    DOE Patents [OSTI]

    Turner, William E. (Durham, CT); Perry, Carl A. (Middletown, CT); Wassell, Mark E. (Kingwood, TX); Barbely, Jason R. (Middletown, CT); Burgess, Daniel E. (Middletown, CT); Cobern, Martin E. (Cheshire, CT)

    2008-06-24

    A preferred embodiment of a system for rotating and guiding a drill bit in an underground bore includes a drilling motor and a drive shaft coupled to drilling motor so that drill bit can be rotated by the drilling motor. The system further includes a guidance module having an actuating arm movable between an extended position wherein the actuating arm can contact a surface of the bore and thereby exert a force on the housing of the guidance module, and a retracted position.

  14. Fatigue Enhancement of Undersized, Drilled Crack-Stop Holes

    E-Print Network [OSTI]

    Crain, Joshua Sakumura

    2010-04-20

    A common technique used to prevent the propagation of cracks in bridge girders is drilling crack-stop holes at the crack tips. By doing so, stress concentrations at the tip of the cracks are reduced and fatigue life of the ...

  15. Drilling deep in South Pole Ice

    E-Print Network [OSTI]

    Karg, Timo

    2014-01-01

    To detect the tiny flux of ultra-high energy neutrinos from active galactic nuclei or from interactions of highest energy cosmic rays with the microwave background photons needs target masses of the order of several hundred cubic kilometers. Clear Antarctic ice has been discussed as a favorable material for hybrid detection of optical, radio and acoustic signals from ultra-high energy neutrino interactions. To apply these technologies at the adequate scale hundreds of holes have to be drilled in the ice down to depths of about 2500 m to deploy the corresponding sensors. To do this on a reasonable time scale is impossible with presently available tools. Remote drilling and deployment schemes have to be developed to make such a detector design reality. After a short discussion of the status of modern hot water drilling we present here a design of an autonomous melting probe, tested 50 years ago to reach a depth of about 1000 m in Greenland ice. A scenario how to build such a probe today with modern technologies...

  16. Energy Storage and Generation for Extreme Temperature and Pressure and Directional Measurement While Drilling Applications

    SciTech Connect (OSTI)

    Signorelli, Riccardo; Cooley, John

    2015-10-14

    FastCAP Systems Corporation has successfully completed all milestones defined by the award DE-EE0005503. Under this program, FastCAP developed three critical subassemblies to TRL3 demonstrating proof of concept of a geothermal MWD power source. This power source includes an energy harvester, electronics and a novel high temperature ultracapacitor (“ultracap”) rechargeable energy storage device suitable for geothermal exploration applications. FastCAP’s ruggedized ultracapacitor (ultracap) technology has been proven and commercialized in oil and gas exploration operating to rated temperatures of 150°C. Characteristics of this technology are that it is rechargeable and relatively high power. This technology was the basis for the advancements in rechargeable energy storage under this project. The ultracap performs reliably at 250°C and beyond and operates over a wide operating temperature range: -5°C to 250°C. The ultracap has significantly higher power density than lithium thionyl chloride batteries, a non-rechargeable incumbent used in oil and gas drilling today. Several hermetically sealed, prototype devices were tested in our laboratories at constant temperatures of 250°C showing no significant degradation over 2000 hours of operation. Other prototypes were tested at Sandia National Lab in the month of April, 2015 for a third party performance validation. These devices showed outstanding performance over 1000 hours of operation at three rated temperatures, 200°C, 225°C and 250°C, with negligible capacitance degradation and minimal equivalent series resistance (ESR) increase. Similarly, FastCAP’s ruggedized electronics have been proven and commercialized in oil and gas exploration operating to rated temperatures of 150°C. This technology was the basis for the advancements in downhole electronics under this project. Principal contributions here focused on design for manufacture innovations that have reduced the prototype build cycle time by a factor of 10x. The electronics have demonstrated a substantially reduced design cycle time by way of process and material selection innovations and have been qualified for 250°C / 10 Grms for at least 200 hours. FastCAP has also invented a rotary inertial energy generator (RIEG) to harvest various mechanical energy sources that exist downhole. This device is flow-independent and has been demonstrated as a proof of concept to survive geothermal well temperatures under this project. The herein energy harvester has been developed to provide operational power by harvesting rotational mechanical energy that exists downhole in geothermal drilling. The energy harvester has been tested at 250°C / 10 Grms for 200 hours. Deployment of these technologies in geothermal drilling and exploration applications could have an immediate and significant impact on the effectiveness and efficiency of drilling processes, particularly with regard to use of advanced logging and monitoring techniques. The ultimate goal of this work is to reduce drilling risk to make geothermal energy more attractive and viable to the customer. Generally speaking, we aim to support the transfer of MWD techniques from oil and gas to geothermal exploration with considerations toward the practical differences between the two. One of the most significant obstacles to the deployment of advanced drilling and production techniques in the geothermal context are limitations related to the maximum operating temperatures of downhole batteries used to provide power for downhole sensors, steering tools, telemetry equipment and other MWD/LWD technologies. FastCAP’s higher temperature ultracapacitor technology will provide power solutions for similar advanced drilling and production techniques, even in the harsher environments associated with geothermal energy production. This ultracapacitor will enable downhole power solutions for the geothermal industry capable of the same reliable and safe operation our team has demonstrated in the oil and gas context. Without batteries, geothermal MWD is left without a downhole power

  17. Development of Wireless Techniques in Data and Power Transmission - Application for Particle Physics Detectors

    E-Print Network [OSTI]

    Brenner, R; Dehos, C; De Lurgio, P; Djurcic, Z; Drake, G; Gimenez, J L Gonzalez; Gustafsson, L; Kim, D W; Locci, E; Roehrich, D; Schoening, A; Siligaris, A; Soltveit, H K; Ullaland, K; Vincent, P; Wiednert, D; Yang, S

    2015-01-01

    Wireless techniques have developed extremely fast over the last decade and using them for data and power transmission in particle physics detectors is not science- fiction any more. During the last years several research groups have independently thought of making it a reality. Wireless techniques became a mature field for research and new developments might have impact on future particle physics experiments. The Instrumentation Frontier was set up as a part of the SnowMass 2013 Community Summer Study [1] to examine the instrumentation R&D for the particle physics research over the coming decades: {\\guillemotleft} To succeed we need to make technical and scientific innovation a priority in the field {\\guillemotright}. Wireless data transmission was identified as one of the innovations that could revolutionize the transmission of data out of the detector. Power delivery was another challenge mentioned in the same report. We propose a collaboration to identify the specific needs of different projects that m...

  18. Non-Linear Seismic Soil Structure Interaction (SSI) Method for Developing Non-Linear Seismic SSI Analysis Techniques

    Office of Energy Efficiency and Renewable Energy (EERE)

    Non-Linear Seismic Soil Structure Interaction (SSI) Method for Developing Non-Linear Seismic SSI Analysis Techniques Justin Coleman, P.E. October 25th, 2011

  19. Development and application of new techniques for blast furnace process control at SSAB Tunnplaat, Luleaa Works

    SciTech Connect (OSTI)

    Braemming, M.; Hallin, M. [SSAB Tunnplaat AB, Luleaa (Sweden); Zuo, G. [Luleaa Univ. (Sweden). Dept. of Process Metallurgy

    1995-12-01

    SSAB Tunnplaat AB operates two blast furnaces (M1 and M2) in Luleaa. In recent years research efforts have to a great extent been aimed at the development of new techniques for blast furnace process control. An example is the installation of a burden profile measurement system, which was useful in the development of a new burden distribution praxis on the big furnace (M2), equipped with a bell-less-top. Hearth level detection and continuous measurement of the hot metal temperature in the runner are under evaluation. The purpose of these techniques is to give earlier information concerning the state of the blast furnace process. Parallel to this work, models for prediction of silicon in hot metal, the position and shape of the cohesive zone and slip-warning are being developed and tested off-line. These new models and information from new measuring techniques will be integrated into a new Operating Guidance System, hopefully resulting in a powerful tool in the efforts to stabilize blast furnace operations.

  20. BOREHOLE DRILLING AND RELATED ACTIVITIES AT THE STRIPA MINE

    E-Print Network [OSTI]

    Kurfurst, P.J.

    2011-01-01

    Drilling Costs and Rates . . . • . . . • • . . . . , . .up, in four 8-hour shifts. Drilling Costs and Rates Costs ofTABLES I. II. III. Costs of Core Drilling Per Meter. . . . .

  1. Drilling Burr Control Chart -Adding a Material Property Axis

    E-Print Network [OSTI]

    Reich-Weiser, Corinne; Dornfeld, David A

    2005-01-01

    the hypothesized 3-D drilling burr control chart. REFERENCESOptimization and Control of Drilling Burr Formation inOptimization and Control of Drilling Burr Formation of AISI

  2. BOREHOLE DRILLING AND RELATED ACTIVITIES AT THE STRIPA MINE

    E-Print Network [OSTI]

    Kurfurst, P.J.

    2011-01-01

    Drilling Costs and Rates . . . • . . . • • . . . . , . .TABLES I. II. III. Costs of Core Drilling Per Meter. . . . .ABSTRACT . . • L vi vi vii INTRODUCTION DRILLING . • Surface

  3. Greening PCB Drilling Process: Burr Minimization and Other Strategies

    E-Print Network [OSTI]

    Huang, Yu-Chu; Linke, Barbara; Bhandari, Binayak; Ahn, Sung-Hoon; Dornfeld, David

    2011-01-01

    of Analytical Model for Drilling Burr Formation in DuctileJ. and Chen, L. , “Drilling Burr Formation in Titaniumfor Burr Minimization in Drilling,” PhD dissertation, The

  4. COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES

    E-Print Network [OSTI]

    Lamb, D.W.

    2013-01-01

    3.2 - Surface Drilling ------------------------------ COSTLBL-11490 COST AND SCHEDULE FOR DRILLING AND MININGDevelopment In-Mine Drilling The cost and time required for

  5. Development and validation of nondestructive inspection techniques for composite doubler repairs on commercial aircraft

    SciTech Connect (OSTI)

    Roach, D.; Walkington, P.

    1998-05-01

    Composite doublers, or repair patches, provide an innovative repair technique which can enhance the way aircraft are maintained. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is possible to bond a single boron-epoxy composite doubler to the damaged structure. In order for the use of composite doublers to achieve widespread use in the civil aviation industry, it is imperative that methods be developed which can quickly and reliably assess the integrity of the doubler. In this study, a specific composite application was chosen on an L-1011 aircraft in order to focus the tasks on application and operation issues. Primary among inspection requirements for these doublers is the identification of disbonds, between the composite laminate and aluminum parent material, and delaminations in the composite laminate. Surveillance of cracks or corrosion in the parent aluminum material beneath the doubler is also a concern. No single nondestructive inspection (NDI) method can inspect for every flaw type, therefore it is important to be aware of available NDI techniques and to properly address their capabilities and limitations. A series of NDI tests were conducted on laboratory test structures and on full-scale aircraft fuselage sections. Specific challenges, unique to bonded composite doubler applications, were highlighted. An array of conventional and advanced NDI techniques were evaluated. Flaw detection sensitivity studies were conducted on applicable eddy current, ultrasonic, X-ray and thermography based devices. The application of these NDI techniques to composite doublers and the results from test specimens, which were loaded to provide a changing flaw profile, are presented in this report. It was found that a team of these techniques can identify flaws in composite doubler installations well before they reach critical size.

  6. Development of high sensitivity techniques for characterizing outgassing of polymeric construction materials for microenvironments

    SciTech Connect (OSTI)

    McIntyre, D.C.; Thornberg, S.M.; Liang, A.Y.; Bender, S.F.A.; Lujan, R.D.

    1994-05-01

    Further reductions in particulate contamination in semiconductor device manufacturing environments will be required to meet the future challenges of producing devices with decreased dimensions. Using pods (microenvironments) to provide very clean environments on a local (wafer level) scale is an alternative that may reduce the technological demands and cost of providing comparable contamination levels in an entire clean-room manufacturing facility. It has been demonstrated that pods can provide wafer environments that have lower and less variable levels of particulate contamination than conventional clean-room manufacturing environments. However, there have also been indications that outgassed constituents from polymeric pod materials can condense on wafers during storage. A standard technique to evaluate outgassing of polymers is needed so that: (1) manufacturers can make reliable comparisons of the outgassing potential of materials being considered for use and (2) microenvironment users can make judgments on the relative outgassing threats from different manufacturers` products. The goal of the work that is summarized below has been to develop standard high sensitivity (10--100 ppb) testing techniques for evaluation of outgassing from polymeric pod materials in a temperature range from 30 C--75 C. This paper will briefly review outgassing data from polycarbonate materials that was obtained using thermal desorption combined with detection using gas chromatography/mass spectroscopy wit volatile pre-concentration or using a flame ionization detector (FID). Although the focus of this program has been on developing techniques to evaluate pod materials of construction, the techniques that have been evaluated may be useful for characterizing outgassing from other polymeric materials found in cleanrooms.

  7. Laser Oil and Gas Well Drilling Demonstration Videos

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    ANL's Laser Applications Laboratory and collaborators are examining the feasibility of adapting high-power laser technology to drilling for gas and oil. The initial phase is designed to establish a scientific basis for developing a commercial laser drilling system and determine the level of gas industry interest in pursuing future research. Using lasers to bore a hole offers an entirely new approach to mechanical drilling. The novel drilling system would transfer light energy from lasers on the surface, down a borehole by a fiber optic bundle, to a series of lenses that would direct the laser light to the rock face. Researchers believe that state-of-the-art lasers have the potential to penetrate rock many times faster than conventional boring technologies - a huge benefit in reducing the high costs of operating a drill rig. Because the laser head does not contact the rock, there is no need to stop drilling to replace a mechanical bit. Moreover, researchers believe that lasers have the ability to melt the rock in a way that creates a ceramic sheath in the wellbore, eliminating the expense of buying and setting steel well casing. A laser system could also contain a variety of downhole sensors, including visual imaging systems that could communicate with the surface through the fiber optic cabling. Earlier studies have been promising, but there is still much to learn. One of the primary objectives of the new study will be to obtain much more precise measurements of the energy requirements needed to transmit light from surface lasers down a borehole with enough power to bore through rocks as much as 20,000 feet or more below the surface. Another objective will be to determine if sending the laser light in sharp pulses, rather than as a continuous stream, could further increase the rate of rock penetration. A third aspect will be to determine if lasers can be used in the presence of drilling fluids. In most wells, thick fluids called "drilling muds" are injected into the borehole to wash out rock cuttings and keep water and other fluids from the underground formations from seeping into the well. The technical challenge will be to determine whether too much laser energy is expended to clear away the fluid where the drilling is occurring. (Copied with editing from http://www.ne.anl.gov/facilities/lal/laser_drilling.html). The demonstration videos, provided here in QuickTime format, are accompanied by patent documents and PDF reports that, together, provide an overall picture of this fascinating project.

  8. DEVELOPMENT OF RESERVOIR CHARACTERIZATION TECHNIQUES AND PRODUCTION MODELS FOR EXPLOITING NATURALLY FRACTURED RESERVOIRS

    SciTech Connect (OSTI)

    Michael L. Wiggins; Raymon L. Brown; Faruk Civan; Richard G. Hughes

    2002-12-31

    For many years, geoscientists and engineers have undertaken research to characterize naturally fractured reservoirs. Geoscientists have focused on understanding the process of fracturing and the subsequent measurement and description of fracture characteristics. Engineers have concentrated on the fluid flow behavior in the fracture-porous media system and the development of models to predict the hydrocarbon production from these complex systems. This research attempts to integrate these two complementary views to develop a quantitative reservoir characterization methodology and flow performance model for naturally fractured reservoirs. The research has focused on estimating naturally fractured reservoir properties from seismic data, predicting fracture characteristics from well logs, and developing a naturally fractured reservoir simulator. It is important to develop techniques that can be applied to estimate the important parameters in predicting the performance of naturally fractured reservoirs. This project proposes a method to relate seismic properties to the elastic compliance and permeability of the reservoir based upon a sugar cube model. In addition, methods are presented to use conventional well logs to estimate localized fracture information for reservoir characterization purposes. The ability to estimate fracture information from conventional well logs is very important in older wells where data are often limited. Finally, a desktop naturally fractured reservoir simulator has been developed for the purpose of predicting the performance of these complex reservoirs. The simulator incorporates vertical and horizontal wellbore models, methods to handle matrix to fracture fluid transfer, and fracture permeability tensors. This research project has developed methods to characterize and study the performance of naturally fractured reservoirs that integrate geoscience and engineering data. This is an important step in developing exploitation strategies for optimizing the recovery from naturally fractured reservoir systems. The next logical extension of this work is to apply the proposed methods to an actual field case study to provide information for verification and modification of the techniques and simulator. This report provides the details of the proposed techniques and summarizes the activities undertaken during the course of this project. Technology transfer activities were highlighted by a two-day technical conference held in Oklahoma City in June 2002. This conference attracted over 90 participants and included the presentation of seventeen technical papers from researchers throughout the United States.

  9. OCEAN DRILLING PROGRAM LEG 164 PRELIMINARY REPORT

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 164 PRELIMINARY REPORT GAS HYDRATE SAMPLING ON THE BLAKE RIDGE of Tokyo (Japan) National Science Foundation (United States) Natural Environment Research Council (United Kingdom) European Science Foundation Consortium for the Ocean Drilling Program (Belgium, Denmark, Finland

  10. Acoustic data transmission through a drill string

    DOE Patents [OSTI]

    Drumheller, D.S.

    1988-04-21

    Acoustical signals are transmitted through a drill string by canceling upward moving acoustical noise and by preconditioning the data in recognition of the comb filter impedance characteristics of the drill string. 5 figs.

  11. BOREHOLE DRILLING AND RELATED ACTIVITIES AT THE STRIPA MINE

    E-Print Network [OSTI]

    Kurfurst, P.J.

    2011-01-01

    XF 60/90 H Drill . . . . . . . . . . . . . . . Detailed ViewAt the peak of drilling, six drills were active--one on theSchedule and Deployment of Drills . General View of Toram

  12. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    SciTech Connect (OSTI)

    Collett, Tim; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta; Myers, Greg; Divins, David; Morell, Margo

    2013-11-30

    This topical report represents a pathway toward better understanding of the impact of marine methane hydrates on safety and seafloor stability and future collection of data that can be used by scientists, engineers, managers and planners to study climate change and to assess the feasibility of marine methane hydrate as a potential future energy resource. Our understanding of the occurrence, distribution and characteristics of marine methane hydrates is incomplete; therefore, research must continue to expand if methane hydrates are to be used as a future energy source. Exploring basins with methane hydrates has been occurring for over 30 years, but these e?orts have been episodic in nature. To further our understanding, these e?orts must be more regular and employ new techniques to capture more data. This plan identifies incomplete areas of methane hydrate research and o?ers solutions by systematically reviewing known methane hydrate “Science Challenges” and linking them with “Technical Challenges” and potential field program locations.

  13. DEVELOPMENT OF ELECTROMAGNETIC TECHNIQUES FOR HYDROGEN CONTENT ASSESSMENT IN COATED LINEPIPE STEEL

    SciTech Connect (OSTI)

    Lasseigne-Jackson, A. N.; Anton, J.; Jackson, J. E.; Olson, D. L.; Mishra, B.

    2008-02-28

    With the introduction of new higher strength steels operating at higher pressure, the need for characterization of hydrogen content in high strength steel pipelines is timely for the pipeline industry. The higher-strength steel pipelines have higher susceptibility to hydrogen damage. Through the use of low-frequency induced current impedance measurements, a new non-contact sensor has been developed for real-time determination of diffusible hydrogen content in coated pipeline steel. A measurement scheme to separate variables associated with pipelines is discussed. This electromagnetic technique allows for a rapid, non-destructive assessment of hydrogen accumulation in coated steel line pipe and thus an evaluation of the pipeline integrity.

  14. AANNUALNNUAL RREPORTEPORT Integrated Ocean Drilling ProgramIntegrated Ocean Drilling Program

    E-Print Network [OSTI]

    AANNUALNNUAL RREPORTEPORT Integrated Ocean Drilling ProgramIntegrated Ocean Drilling Program U ANNUAL REPORT #12;#12;Integrated Ocean Drilling Program United States Implementing Organization JOI T his Integrated Ocean Drilling Program (IODP)-U.S. Implementing Organization (USIO) Fiscal Year 2006

  15. CAD BASED DRILLING USING CONVENTIONAL TWIST DRILLS PANAGIOTIS KYRATSIS*, Dr. Ing. NIKOLAOS BILALIS**, Dr. VASILIS

    E-Print Network [OSTI]

    Aristomenis, Antoniadis

    CAD BASED DRILLING USING CONVENTIONAL TWIST DRILLS PANAGIOTIS KYRATSIS*, Dr. Ing. NIKOLAOS BILALIS, antoniadis@dpem.tuc.gr Abstract: Twist drills are geometrically complex tools, which are used in industry and experimental approaches for drilling simulation. The present paper is based on the ground that the increasing

  16. 2006 Ocean Drilling Citation Report Overview of the Ocean Drilling Citation Database

    E-Print Network [OSTI]

    2006 Ocean Drilling Citation Report Overview of the Ocean Drilling Citation Database The Ocean Drilling Citation Database, which contained almost 22,000 citation records related to the Deep Sea Drilling Institute (AGI). The database has been on line since August 2002. Beginning in 2006, citation records

  17. Private Water Well Testing in Areas Impacted by Marcellus Shale Gas Drilling

    E-Print Network [OSTI]

    Walter, M.Todd

    Private Water Well Testing in Areas Impacted by Marcellus Shale Gas Drilling (Updated May 10th in the absence of shale-gas drilling, well owners are strongly encouraged to evaluate their water on a regular testing in order to more specifically document potential impacts of Marcellus Shale gas development

  18. A simulation study of a Subsea Mudlift Drilling system during tripping operations 

    E-Print Network [OSTI]

    Escobar Parada, Alvaro Hernando

    1999-01-01

    To face the new challenges that the petroleum industry has in deepwaters, a Subsea Mudlift Drilling Joint Industry Project, SMDJIP, was formed. The main task for this project is to develop the technology needed to drill in water depths beyond 7500...

  19. OCEAN DRILLING PROGRAM LEG 159 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 159 SCIENTIFIC PROSPECTUS THE COTE D'IVOIRE - GHANA TRANSFORM MARGIN, Leg 159 Ocean Drilling Program Texas A&M University Research Park 1000 Discovery Drive College Station requires the written consent of the Director, Ocean Drilling Program, Texas A&M University Research Park

  20. OCEAN DRILLING PROGRAM LEG 165 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 165 SCIENTIFIC PROSPECTUS CARIBBEAN OCEAN HISTORY AND THE CRETACEOUS Scientist, Leg 165 Ocean Drilling Program Texas A&M University Research Park 1000 Discovery Drive College of any portion requires the written consent of the Director, Ocean Drilling Program, Texas A&M University

  1. SHIPBOARD SCIENTISTS1 OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    SHIPBOARD SCIENTISTS1 HANDBOOK OCEAN DRILLING PROGRAM TEXAS A&M UNIVERSITY TECHNICAL NOTE 3 portion requires the written consent of the Director, Ocean Drilling Program, Texas A&M University be obtained from the Director, Ocean Drilling Program, Texas A & M University Research Park, 1000 Discovery

  2. LEG 142 PRELIMINARY REPORT OCEAN DRILLING PROGRAM

    E-Print Network [OSTI]

    LEG 142 PRELIMINARY REPORT OCEAN DRILLING PROGRAM ENGINEERING PRELIMINARY REPORT NO. 3 EAST PACIFIC RISE 1992 #12;OCEAN DRILLING PROGRAM LEG 142 PRELIMINARY REPORT East Pacific Rise Dr. Rodey Batiza Co 96822 Mr. Michael A. Storms Operations Superintendent/ Assistant Manager of Engineering and Drilling

  3. OCEAN DRILLING PROGRAM LEG 110 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 110 SCIENTIFIC PROSPECTUS LESSER ANTILLES FOREARC J. Casey Moore Staff Science Representative, Leg 110 Ocean Drilling Program Texas A&M University College Station, TX 77843-3469 Philip D. Direct* Ocean Drilling Program Robert B. Kidd Manager of Science Operations Ocean

  4. OCEAN DRILLING PROGRAM LEG 105 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 105 SCIENTIFIC PROSPECTUS LABRADOR SEA - BAFFIN BAY Dr. Michael A. Bradford Clement Staff Science Representative, Leg 105 Ocean Drilling Program Texas A & M University College Station, TX 77843-3469" Philip Director Ocean Drilling Program Robert B. Kidd Manager of Science

  5. OCEAN DRILLING PROGRAM LEG 205 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 205 SCIENTIFIC PROSPECTUS FLUID FLOW AND SUBDUCTION FLUXES ACROSS __________________ Dr. Jack Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University Manager and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery Drive College

  6. OCEAN DRILLING PROGRAM LEG 100 REPORT

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 100 REPORT NORTHEASTERN GULF OF MEXICO Philip D Rabinowitz Co-Chief Scientist, Leg 100 Ocean Drilling Program Texas A&M University College Station, TX 77843 William J. Merrell Co-Chief Scientist, Leg 100 Ocean Drilling Program Texas A&M University College Station, TX 77843

  7. OCEAN DRILLING PROGRAM LEG 185 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 185 SCIENTIFIC PROSPECTUS IZU-MARIANA MARGIN Dr. Terry Plank Co France Dr. Carlota Escutia Staff Scientist Ocean Drilling Program Texas A&M University Research Park 1000 the written consent of the Director, Ocean Drilling Program, Texas A&M University Research Park, 1000

  8. OCEAN DRILLING PROGRAM LEG 202 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 202 SCIENTIFIC PROSPECTUS SOUTHEAST PACIFIC PALEOCEANOGRAPHIC TRANSECTS __________________ Dr. Jack Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University Manager and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery Drive College

  9. OCEAN DRILLING PROGRAM LEG 120 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 120 SCIENTIFIC PROSPECTUS CENTRAL KERGUELEN PLATEAU Dr. Roland Schlich Drilling Program Texas A&M University College Station, TX 77841 Philip D.VRabinowitz Director ^^~-- ODP of the Director, Ocean Drilling Program, Texas A&M University Research Park, 1000 Discovery Drive, College Station

  10. UNIVERSITY OF WASHINGTON FIRE DRILL REPORT

    E-Print Network [OSTI]

    Matrajt, Graciela

    UNIVERSITY OF WASHINGTON FIRE DRILL REPORT ENVIRONMENTAL HEALTH AND SAFETY Building Name Facility or Building Administrator/Coordinator Date of Drill Device Activated (location) Time Initiated Time Completed Verify that all procedures for preparing and conducting fire drills have been completed. Do not activate

  11. OCEAN DRILLING PROGRAM LEG 100 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 100 SCIENTIFIC PROSPECTUS SHAKEDOWN AND SEA TRIALS CRUISE Philip D. Rabinowitz Co-Chief Scientist, Leg 100 Ocean Drilling Program Texas A&M University College Station, TX 77843 William J. Merrell Co-Chief Scientist, Leg 100 Ocean Drilling Program Texas A&M University College Station

  12. OCEAN DRILLING PROGRAM LEG 199 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 199 SCIENTIFIC PROSPECTUS PALEOGENE EQUATORIAL TRANSECT Dr. Mitchell __________________ Dr. Jack Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University Project Manager and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery Drive

  13. OCEAN DRILLING PROGRAM LEG 195 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 195 SCIENTIFIC PROSPECTUS MARIANA CONVERGENT MARGIN/ WEST PHILIPPINE SEA Baldauf Deputy Director of Science Operations Ocean Drilling Program Texas A&M University 1000 Discovery and Staff Scientist Ocean Drilling Program Texas A&M University 1000 Discovery Drive College Station TX

  14. OCEAN DRILLING PROGRAM LEG 140 PRELIMINARY REPORT

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 140 PRELIMINARY REPORT HOLE 504B Dr. Henry Dick Dr. Jörg Erzinger Co Giessen Federal Republic of Germany Dr. Laura Stokking Staff Scientist, Leg 140 Ocean Drilling Program Copies of this publication may be obtained from the Director, Ocean Drilling Program, Texas A

  15. OCEAN DRILLING PROGRAM LEG 191 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 191 SCIENTIFIC PROSPECTUS NORTHWEST PACIFIC SEISMIC OBSERVATORY AND HAMMER DRILL ENGINEERING TESTS Dr. Toshihiko Kanazawa Co-Chief Scientist Earthquake Research Institute Director of Science Operations Ocean Drilling Program Texas A&M University 1000 Discovery Drive College

  16. DEEP SEA DRILLING PROJECT DATA FILE DOCUMENTS

    E-Print Network [OSTI]

    DEEP SEA DRILLING PROJECT DATA FILE DOCUMENTS Ocean Drilling Program Texas A&M University Technical; however, republication of any portion requires the written consent of the Director, Ocean Drilling Program, Texas A&M University Research Park, 1000 Discovery Drive, College Station, Texas 77840, as well

  17. Subsea Mudlift Drilling: evaluation of the pressure differential problem with subsea pump 

    E-Print Network [OSTI]

    Johansen, Tarjei

    2000-01-01

    The petroleum industry is trying to develop new and improved technology to safely, successfully and profitably extract hydrocarbons in deep water. One such technology under development is subsea mudlift drilling (SMD), a joint industry project...

  18. Varistab proves efficient in extended-reach rotary drilling

    SciTech Connect (OSTI)

    Faye, J.B.; Chaffaut, B. du; Boulet, J.; Wessel, R.

    1995-10-01

    Varistab is a reliable and practical drilling tool which overcomes inherent disadvantages of motor-based steerable systems and provides accurate inclination control during rotary drilling. Where both inclination and azimuth control are required, Varistab can be used in conjunction with a steerable motor. Whereas numerical models cannot account for effects of formation changes and stabilizer-blade wear in rotary assemblies, the use of Varistab allows remote-controlled real-time adjustments to correct unavoidable numerical-model inaccuracies. It is now realistic, with such a tool, to envisage drilling sophisticated trajectories with rotary assemblies such as the catenary profile which can reduce friction of the drillstring-to-wall contact, as well as in subsequent casing-string runs and production equipment. This article will discuss rotary drilling advantages using the Varistab over drilling with steerable motors. Also presented are details on the tool`s development and commercialization phases, along with characteristics of the present-day tool and case histories.

  19. Optical coherence tomography guided dental drill

    DOE Patents [OSTI]

    DaSilva, Luiz B. (Danville, CA); Colston, Jr., Bill W. (Livermore, CA); James, Dale L. (Tracy, CA)

    2002-01-01

    A dental drill that has one or multiple single mode fibers that can be used to image in the vicinity of the drill tip. It is valuable to image below the surface being drilled to minimize damage to vital or normal tissue. Identifying the boundary between decayed and normal enamel (or dentine) would reduce the removal of viable tissue, and identifying the nerve before getting too close with the drill could prevent nerve damage. By surrounding a drill with several optical fibers that can be used by an optical coherence domain reflectometry (OCDR) to image several millimeters ahead of the ablation surface will lead to a new and improved dental treatment device.

  20. Conformable apparatus in a drill string

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2007-08-28

    An apparatus in a drill string comprises an internally upset drill pipe. The drill pipe comprises a first end, a second end, and an elongate tube intermediate the first and second ends. The elongate tube and the ends comprising a continuous an inside surface with a plurality of diameters. A conformable metal tube is disposed within the drill pipe intermediate the ends thereof and terminating adjacent to the ends of the drill pipe. The conformable metal tube substantially conforms to the continuous inside surface of the metal tube. The metal tube may comprise a non-uniform section which is expanded to conform to the inside surface of the drill pipe. The non-uniform section may comprise protrusions selected from the group consisting of convolutions, corrugations, flutes, and dimples. The non-uniform section extends generally longitudinally along the length of the tube. The metal tube may be adapted to stretch as the drill pipes stretch.

  1. Drilling ban yields verdict

    SciTech Connect (OSTI)

    Nation, L.M.

    1992-01-01

    This paper briefly reviews a lawsuit which is under appeal by the State of Michigan regarding a takings claim filed over a petroleum exploration site. The dispute arose as a result of a 1987 decision by the Michigan Department of Natural Resources forbidding the property owners from developing the mineral rights leased to Miller Brothers in the Huron/Manistee National Forest. This area is bisected by a trend of Silurian Niagaran reef complexes which has a known production history throughout the State. The dunes area of the national forest has been deemed a wilderness area. As a result of the State's decision, the courts have awarded a sum of 71 million dollars to the developer to cover damages and lost resources. The reserve estimates were taken from adjacent areas which showed that the Niagaran reefs are relatively consistent in their yield.

  2. Development of an ultrasonic pulse-echo (UPE) technique for aircraft icing studies

    SciTech Connect (OSTI)

    Liu, Yang; Hu, Hui [Department of Aerospace Engineering, Iowa State University, 2271 Howe Hall, Room 1200, Ames, IA 50011 (United States); Chen, Wen-Li [Department of Aerospace Engineering, Iowa State University, 2271 Howe Hall, Room 1200, Ames, IA 50011 (United States); School of Civil Engineering, Harbin Institute of Technology, Harbin, Heilongjiang 150090 (China); Bond, Leonard J. [Department of Aerospace Engineering, Iowa State University, 2271 Howe Hall, Room 1200, Ames, IA 50011 (United States); Center for Nondestructive Evaluation, Iowa State University, 1915 Scholl Road, 151 ASC II, Ames, IA 50011 (United States)

    2014-02-18

    Aircraft operating in some cold weather conditions face the risk of icing. Icing poses a threat to flight safety and its management is expensive. Removing light frost on a clear day from a medium-size business jet can cost $300, heavy wet snow removal can cost $3,000 and removal of accumulated frozen/freezing rain can cost close to $10,000. Understanding conditions that lead to severe icing events is important and challenging. When an aircraft or rotorcraft flies in a cold climate, some of the super cooled droplets impinging on exposed aircraft surfaces may flow along the surface prior to freezing and give various forms and shapes of ice. The runback behavior of a water film on an aircraft affects the morphology of ice accretion and the rate of formation. In this study, we report the recent progress to develop an Ultrasonic Pulse-Echo (UPE) technique to provide real-time thickness distribution measurements of surface water flows driven by boundary layer airflows for aircraft icing studies. A series of initial experimental investigations are conducted in an ice wind tunnel employing an array of ultrasonic transducers placed underneath the surface of a flat plate. The water runback behavior on the plate is evaluated by measuring the thickness profile variation of the water film along the surface by using the UPE technique under various wind speed and flow rate conditions.

  3. Development of algorithms for capacitance imaging techniques for fluidized bed flow fields

    SciTech Connect (OSTI)

    Loudin, W.J.

    1991-01-01

    The objective of this research is to provide support for the instrumentation concept of a High Resolution Capacitance Imaging System (HRCIS). The work involves the development and evaluation of the mathematical theory and associated models and algorithms which reduce the electronic measurements to valid physical characterizations. The research and development require the investigation of techniques to solve large systems of equations based on capacitance measurements for various electrode configurations in order to estimate densities of materials in a cross-section of a fluidized bed. Capacitance measurements are made for 400 connections of the 32-electrode system; 400 corresponding electric-field curves are constructed by solving a second order partial differential equation. These curves are used to partition the circular disk into 193 regions called pixels, and the density of material in each pixel is to be estimated. Two methods of approximating densities have been developed and consideration of a third method has been initiated. One method (Method 1) is based on products of displacement currents for intersecting electric-field curves on a cross section. For each pixel one point of intersection is chosen, and the product of the capacitance measurements is found. Both the product and the square-root-of-product seem to yield good relative distribution of densities.

  4. Development of algorithms for capacitance imaging techniques for fluidized bed flow fields. 1990 Annual report

    SciTech Connect (OSTI)

    Loudin, W.J.

    1991-01-01

    The objective of this research is to provide support for the instrumentation concept of a High Resolution Capacitance Imaging System (HRCIS). The work involves the development and evaluation of the mathematical theory and associated models and algorithms which reduce the electronic measurements to valid physical characterizations. The research and development require the investigation of techniques to solve large systems of equations based on capacitance measurements for various electrode configurations in order to estimate densities of materials in a cross-section of a fluidized bed. Capacitance measurements are made for 400 connections of the 32-electrode system; 400 corresponding electric-field curves are constructed by solving a second order partial differential equation. These curves are used to partition the circular disk into 193 regions called pixels, and the density of material in each pixel is to be estimated. Two methods of approximating densities have been developed and consideration of a third method has been initiated. One method (Method 1) is based on products of displacement currents for intersecting electric-field curves on a cross section. For each pixel one point of intersection is chosen, and the product of the capacitance measurements is found. Both the product and the square-root-of-product seem to yield good relative distribution of densities.

  5. Filter for a drill string

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Briscoe, Michael (Lehi, UT); McPherson, James (Sandy, UT)

    2007-12-04

    A filter for a drill string comprises a perforated receptacle having an open end and a perforated end and first and second mounting surfaces are adjacent the open end. A transmission element is disposed within each of the first and second mounting surfaces. A capacitor may modify electrical characteristics of an LC circuit that comprises the transmission elements. The respective transmission elements are in communication with each other and with a transmission network integrated into the drill string. The transmission elements may be inductive couplers, direct electrical contacts, or optical couplers. In some embodiments of the present invention, the filter comprises an electronic component. The electronic component may be selected from the group consisting of a sensor, a router, a power source, a clock source, a repeater, and an amplifier.

  6. Development of experimental verification techniques for non-linear deformation and fracture on the nanometer scale.

    SciTech Connect (OSTI)

    Moody, Neville Reid; Bahr, David F.

    2005-11-01

    This work covers three distinct aspects of deformation and fracture during indentations. In particular, we develop an approach to verification of nanoindentation induced film fracture in hard film/soft substrate systems; we examine the ability to perform these experiments in harsh environments; we investigate the methods by which the resulting deformation from indentation can be quantified and correlated to computational simulations, and we examine the onset of plasticity during indentation testing. First, nanoindentation was utilized to induce fracture of brittle thin oxide films on compliant substrates. During the indentation, a load is applied and the penetration depth is continuously measured. A sudden discontinuity, indicative of film fracture, was observed upon the loading portion of the load-depth curve. The mechanical properties of thermally grown oxide films on various substrates were calculated using two different numerical methods. The first method utilized a plate bending approach by modeling the thin film as an axisymmetric circular plate on a compliant foundation. The second method measured the applied energy for fracture. The crack extension force and applied stress intensity at fracture was then determined from the energy measurements. Secondly, slip steps form on the free surface around indentations in most crystalline materials when dislocations reach the free surface. Analysis of these slip steps provides information about the deformation taking place in the material. Techniques have now been developed to allow for accurate and consistent measurement of slip steps and the effects of crystal orientation and tip geometry are characterized. These techniques will be described and compared to results from dislocation dynamics simulations.

  7. Potter Drilling | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas:Pottawattamie County, Iowa: Energy ResourcesDrilling

  8. The development of optical microscopy techniques for the advancement of single-particle studies

    SciTech Connect (OSTI)

    Marchuk, Kyle

    2013-05-15

    Single particle orientation and rotational tracking (SPORT) has recently become a powerful optical microscopy tool that can expose many molecular motions. Unfortunately, there is not yet a single microscopy technique that can decipher all particle motions in all environmental conditions, thus there are limitations to current technologies. Within, the two powerful microscopy tools of total internal reflection and interferometry are advanced to determine the position, orientation, and optical properties of metallic nanoparticles in a variety of environments. Total internal reflection is an optical phenomenon that has been applied to microscopy to produce either fluorescent or scattered light. The non-invasive far-field imaging technique is coupled with a near-field illumination scheme that allows for better axial resolution than confocal microscopy and epi-fluorescence microscopy. By controlling the incident illumination angle using total internal reflection fluorescence (TIRF) microscopy, a new type of imaging probe called “non-blinking” quantum dots (NBQDs) were super-localized in the axial direction to sub-10-nm precision. These particles were also used to study the rotational motion of microtubules being propelled by the motor protein kinesin across the substrate surface. The same instrument was modified to function under total internal reflection scattering (TIRS) microscopy to study metallic anisotropic nanoparticles and their dynamic interactions with synthetic lipid bilayers. Utilizing two illumination lasers with opposite polarization directions at wavelengths corresponding to the short and long axis surface plasmon resonance (SPR) of the nanoparticles, both the in-plane and out-of-plane movements of many particles could be tracked simultaneously. When combined with Gaussian point spread function (PSF) fitting for particle super-localization, the binding status and rotational movement could be resolved without degeneracy. TIRS microscopy was also used to find the 3D orientation of stationary metallic anisotropic nanoparticles utilizing only long-axis SPR enhancement. The polarization direction of the illuminating light was rotated causing the relative intensity of p-polarized and s-polarized light within the evanescent field to change. The interaction of the evanescent field with the particles is dependent on the orientation of the particle producing an intensity curve. This curve and the in-plane angle can be compared with simulations to accurately determine the 3D orientation. Differential interference contrast (DIC) microscopy is another non-invasive far-field technique based upon interferometry that does not rely on staining or other contrast enhancing techniques. In addition, high numerical aperture condensers and objectives can be used to give a very narrow depth of field allowing for the optical tomography of samples, which makes it an ideal candidate to study biological systems. DIC microscopy has also proven itself in determining the orientation of gold nanorods in both engineered environments and within cells. Many types of nanoparticles and nanostructures have been synthesized using lithographic techniques on silicon wafer substrates. Traditionally, reflective mode DIC microscopes have been developed and applied to the topographical study of reflective substrates and the imaging of chips on silicon wafers. Herein, a laser-illuminated reflected-mode DIC was developed for studying nanoparticles on reflective surfaces.

  9. Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Drilling and Testing Activity (Frio, Wilcox, and Tuscaloosa Formations, Texas and Louisiana)

    SciTech Connect (OSTI)

    1981-09-01

    The Department of Energy (DOE) has initiated a program to evaluate the feasibility of developing the geothermal-geopressured energy resources of the Louisiana-Texas Gulf Coast. As part of this effort, DOE is contracting for the drilling of design wells to define the nature and extent of the geopressure resource. At each of several sites, one deep well (4000-6400 m) will be drilled and flow tested. One or more shallow wells will also be drilled to dispose of geopressured brines. Each site will require about 2 ha (5 acres) of land. Construction and initial flow testing will take approximately one year. If initial flow testing is successful, a continuous one-year duration flow test will take place at a rate of up to 6400 m{sup 3} (40,000 bbl) per day. Extensive tests will be conducted on the physical and chemical composition of the fluids, on their temperature and flow rate, on fluid disposal techniques, and on the reliability and performance of equipment. Each project will require a maximum of three years to complete drilling, testing, and site restoration.

  10. CFPL installs products pipeline with directional drilling

    SciTech Connect (OSTI)

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  11. Shallow gas well drilling with coiled tubing in the San Juan Basin

    SciTech Connect (OSTI)

    Moon, R.G.; Ovitz, R.W.; Guild, G.J.; Biggs, M.D.

    1996-12-31

    Coiled tubing is being utilized to drill new wells, for re-entry drilling to deepen or laterally extend existing wells, and for underbalanced drilling to prevent formation damage. Less than a decade old, coiled tubing drilling technology is still in its inaugral development stage. Initially, utilizing coiled tubing was viewed as a {open_quotes}science project{close_quotes} to determine the validity of performing drilling operations in-lieu of the conventional rotary rig. Like any new technology, the initial attempts were not always successful, but did show promise as an economical alternative if continued efforts were made in the refinement of equipment and operational procedures. A multiwell project has been completed in the San Juan Basin of Northwestern New Mexico which provides documentation indicating that coiled tubing can be an alternative to the conventional rotary rig. A 3-well pilot project, a 6-well project was completed uniquely utilizing the combined resources of a coiled tubing service company, a producing company, and a drilling contractor. This combination of resources aided in the refinement of surface equipment, personnel, mud systems, jointed pipe handling, and mobilization. The results of the project indicate that utilization of coiled tubing for the specific wells drilled was an economical alternative to the conventional rotary rig for drilling shallow gas wells.

  12. Development of Versatile Compressor Modeling using Approximation Techniques for Alternative Refrigerants Evaluation

    SciTech Connect (OSTI)

    Abdelaziz, Omar; Shrestha, Som S

    2014-01-01

    Refrigerants are the life-blood of vapor compression systems that are widely used in Heating, Ventilation, Air-Conditioning, and Refrigeration (HVAC&R) applications. The HVAC&R community is currently transitioning from main-stream refrigerants that have high Global Warming Potential (GWP) to alternative lower-GWP refrigerants. During this transition, it is important to account for the life cycle climate performance of alternative refrigerants since their performance will be different than that of higher-GWP refrigerants. This requires the evaluation of the system performance with the new refrigerants. Unfortunately, it is extremely difficult to predict the realistic performance of new alternative refrigerants without experimental validation. One of the main challenges in this regard is modeling the compressor performance with high fidelity due to the complex interaction of operating parameters, geometry, boundary conditions, and fluid properties. High fidelity compressor models are computationally expensive and require significant pre-processing to evaluate the performance of alternative refrigerants. This paper presents a new approach to modeling compressor performance when alternative refrigerants are used. The new modeling concept relies on using existing compressor performance to create an approximate model that captures the dependence of compressor performance on key operating parameters and fluid properties. The model can be built using a myriad of approximation techniques. This paper focuses on Kriging-based techniques to develop higher fidelity approximate compressor models. Baseline and at least one alternative refrigerant performance data are used to build the model. The model accuracy was evaluated by comparing the model results with compressor performance data using other refrigerants. Preliminary results show that the approximate model can predict the compressor mass flow rate and power consumption within 5%.

  13. Development of analytical techniques to study H2s poisoning of PEMFCs and components

    SciTech Connect (OSTI)

    Brosha, Eric L; Rockward, Tommy; Uribe, Francisco A; Garzon, Fernando H

    2008-01-01

    Polymer electrolyte membrane fuel cells are sensitive to impurities that may be present in either the oxidizer or fuel. H{sub 2}S, even at the ppb level, will have a dramatic and adverse affect on fuel cell performance. Not only is it important to know a particular material's affinity to adsorb H{sub 2}S, when considering materials for PEMFC applications, issues such as permeation and crossover rates also become extremely important Several experimental methods have been developed to quantify H{sub 2}S adsorption onto surfaces and to quantify H{sub 2}S permeation through Nafion(reg.) membranes using readily available and inexpensive Ag/AgS ion probes. In addition to calculating the H{sub 2}S uptake on commonly used XC-72 carbon supports and PtlXC-72 catalysts, the H{sub 2}S permeability through dry and humidified Nafion(reg.) PEMFC membranes was also studied using these specialized techniques. In each ion probe experiment performed, a sulfide anti-oxidant buffer solution was used to trap and concentrate trace quantities of H{sub 2}S during the course of the measurement. Crossover experiments were conducted for up to 24 hours in order to achieve sulfide ion concentrations high enough to be precisely determined by subsequent titration with Pb(NO{sub 3}){sub 2}. By using these techniques, we have confirmed H{sub 2}S crossover in Nafion(reg.) membranes and have calculated preliminary rates of H{sub 2}S crossover.

  14. Coiled tubing drilling (CTD) moves to commercial viability

    SciTech Connect (OSTI)

    Romagno, R. ); Walker, R. )

    1994-12-01

    Shell Western E and P, Inc. (SWEPI) California Drilling Operations was interested in coiled tubing (CT) for drilling slimhole steam injectors. A four-well pilot project at South Belridge field, Kern County, Calif., was targeted for immediate CT use. Well programs included completion, a goal not previously attempted on wells drilled from surface with CT. This paper reviews the primary project focus which was to develop slimhole steam injectors and improve injection profiles in lower Tulare formation E and G sands. Feasibility of drilling wells with CT and having CT crews run and cement completion tubulars in place was an issue to be determined. Conventional tubing installation is usually outside the scope of CT operations, so it was not known if this would be technically or economically feasible. Another goal was to refine personnel expertise to further develop CTD services as a successful business line. Other items targeted for investigation were: deviation control; lost circulation solutions; WOB optimization to obtain maximum ROP; potential steam blowout intervals; and high temperature. Finally, economic feasibility of using CTD as a rotary rig alternative for specific applications like slimhole wells on sites where surface location is limited was to be determined.

  15. Learning by Drilling: Inter-Firm Learning and Relationship Persistence in the Texas Oilpatch

    E-Print Network [OSTI]

    KELLOGG, RYAN M

    2007-01-01

    but do not actually drill wells themselves. Drilling isthe time required to drill each well, requires the technicalcertain firm pairings to drill more effectively than others.

  16. Subsea BOP stack built for Caspian drilling

    SciTech Connect (OSTI)

    Not Available

    1991-12-16

    This paper reports that Shaffer Inc. completed construction of a multi-million dollar subsea drilling system for Caspmorneftegas, an operating company in the Republic of Azerbaijan. The subsea stack will be installed on the semisubmersible drilling rig Shelf 7 currently under construction in Astrakan in the Soviet Union. Shelf 7 will drill wells in the Caspian Sea, one of the most prolific production areas in the Soviet Union.

  17. Validation of Innovative Exploration Technologies for Newberry Volcano: Drill Site Location Map 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jaffe, Todd

    2012-01-01

    Newberry project drill site location map 2010. Once the exploration mythology is validated, it can be applied throughout the Cascade Range and elsewhere to locate and develop “blind” geothermal resources.

  18. Validation of Innovative Exploration Technologies for Newberry Volcano: Drill Site Location Map 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jaffe, Todd

    Newberry project drill site location map 2010. Once the exploration mythology is validated, it can be applied throughout the Cascade Range and elsewhere to locate and develop “blind” geothermal resources.

  19. Development of Fuzzy Logic-Based Lead Acid Battery Management Techniques with Applications to 42V Systems

    E-Print Network [OSTI]

    Singh, Pritpal

    on changing battery conditions. Finally, the fuzzy logic methodology lends itself well to rapid system designDevelopment of Fuzzy Logic-Based Lead Acid Battery Management Techniques with Applications to 42V volt systems is being phased into commercial vehicles, the battery technology is being developed

  20. LLaannggeerrhhaannss LLaabb PPrroottooccoollss Importing DRILL Data via .txt file

    E-Print Network [OSTI]

    Langerhans, Brian

    LLaannggeerrhhaannss LLaabb PPrroottooccoollss Importing DRILL Data via .txt file To import data into the DRILL or to modify existing entries or to delete entries, using a modified DRILL data xlsx./ .txt file instead of using the DRILL Admin functions. 1. Back up the DRILL using the weekly backup protocol. 2

  1. 2010 OCEAN DRILLING CITATION REPORT Covering Citations Related to the

    E-Print Network [OSTI]

    2010 OCEAN DRILLING CITATION REPORT Covering Citations Related to the Deep Sea Drilling Project, Ocean Drilling Program, and Integrated Ocean Drilling Program from GeoRef Citations Indexed by the American Geological Institute from 1969 through 2009 Produced by Integrated Ocean Drilling Program

  2. 2008 OCEAN DRILLING CITATION REPORT Covering Citations Related to the

    E-Print Network [OSTI]

    2008 OCEAN DRILLING CITATION REPORT Covering Citations Related to the Deep Sea Drilling Project, Ocean Drilling Program, and Integrated Ocean Drilling Program from GeoRef Citations Indexed by the American Geological Institute from 1969 through 2007 Produced by Integrated Ocean Drilling Program

  3. 2009 OCEAN DRILLING CITATION REPORT Covering Citations Related to the

    E-Print Network [OSTI]

    2009 OCEAN DRILLING CITATION REPORT Covering Citations Related to the Deep Sea Drilling Project, Ocean Drilling Program, and Integrated Ocean Drilling Program from GeoRef Citations Indexed by the American Geological Institute from 1969 through 2008 Produced by Integrated Ocean Drilling Program

  4. 2012 OCEAN DRILLING CITATION REPORT Covering Citations Related to the

    E-Print Network [OSTI]

    2012 OCEAN DRILLING CITATION REPORT Covering Citations Related to the Deep Sea Drilling Project, Ocean Drilling Program, and Integrated Ocean Drilling Program from GeoRef Citations Indexed by the American Geological Institute from 1969 through 2011 Produced by Integrated Ocean Drilling Program

  5. 2013 OCEAN DRILLING CITATION REPORT Covering Citations Related to the

    E-Print Network [OSTI]

    2013 OCEAN DRILLING CITATION REPORT Covering Citations Related to the Deep Sea Drilling Project, Ocean Drilling Program, and Integrated Ocean Drilling Program from GeoRef Citations Indexed by the American Geological Institute from 1969 through 2012 Produced by Integrated Ocean Drilling Program

  6. Newberry exploratory slimhole: Drilling and testing

    SciTech Connect (OSTI)

    Finger, J.T.; Jacobson, R.D.; Hickox, C.E.

    1997-11-01

    During July--November, 1995, Sandia National Laboratories, in cooperation with CE Exploration, drilled a 5,360 feet exploratory slimhole (3.895 inch diameter) in the Newberry Known Geothermal Resource Area (KGRA) near Bend, Oregon. This well was part of Sandia`s program to evaluate slimholes as a geothermal exploration tool. During and after drilling the authors performed numerous temperature logs, and at the completion of drilling attempted to perform injection tests. In addition to these measurements, the well`s data set includes: over 4,000 feet of continuous core (with detailed log); daily drilling reports from Sandia and from drilling contractor personnel; daily drilling fluid record; and comparative data from other wells drilled in the Newberry KGRA. This report contains: (1) a narrative account of the drilling and testing, (2) a description of equipment used, (3) a brief geologic description of the formation drilled, (4) a summary and preliminary interpretation of the data, and (5) recommendations for future work.

  7. Loaded Transducer Fpr Downhole Drilling Component

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2005-07-05

    A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. To close gaps present between transmission elements, transmission elements may be biased with a "spring force," urging them closer together.

  8. High Temperature 300°C Directional Drilling System

    Broader source: Energy.gov [DOE]

    Project objective: provide a directional drilling system that can be used at environmental temperatures of up to 300°C; and at depths of 10; 000 meters.

  9. Loaded transducer for downhole drilling components

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Briscoe, Michael A.; Dahlgren, Scott Steven; Fox, Joe; Sneddon, Cameron

    2006-02-21

    A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. To close gaps present between transmission elements, transmission elements may be biased with a "spring force, urging them closer together."

  10. Driltac (Drilling Time and Cost Evaluation)

    SciTech Connect (OSTI)

    None

    1986-08-01

    The users manual for the drill tech model for estimating the costs of geothermal wells. The report indicates lots of technical and cost detail. [DJE-2005

  11. Developing new optical imaging techniques for single particle and molecule tracking in live cells

    SciTech Connect (OSTI)

    Sun, Wei

    2010-12-15

    Differential interference contrast (DIC) microscopy is a far-field as well as wide-field optical imaging technique. Since it is non-invasive and requires no sample staining, DIC microscopy is suitable for tracking the motion of target molecules in live cells without interfering their functions. In addition, high numerical aperture objectives and condensers can be used in DIC microscopy. The depth of focus of DIC is shallow, which gives DIC much better optical sectioning ability than those of phase contrast and dark field microscopies. In this work, DIC was utilized to study dynamic biological processes including endocytosis and intracellular transport in live cells. The suitability of DIC microscopy for single particle tracking in live cells was first demonstrated by using DIC to monitor the entire endocytosis process of one mesoporous silica nanoparticle (MSN) into a live mammalian cell. By taking advantage of the optical sectioning ability of DIC, we recorded the depth profile of the MSN during the endocytosis process. The shape change around the nanoparticle due to the formation of a vesicle was also captured. DIC microscopy was further modified that the sample can be illuminated and imaged at two wavelengths simultaneously. By using the new technique, noble metal nanoparticles with different shapes and sizes were selectively imaged. Among all the examined metal nanoparticles, gold nanoparticles in rod shapes were found to be especially useful. Due to their anisotropic optical properties, gold nanorods showed as diffraction-limited spots with disproportionate bright and dark parts that are strongly dependent on their orientation in the 3D space. Gold nanorods were developed as orientation nanoprobes and were successfully used to report the self-rotation of gliding microtubules on kinesin coated substrates. Gold nanorods were further used to study the rotational motions of cargoes during the endocytosis and intracellular transport processes in live mammalian cells. New rotational information was obtained: (1) during endocytosis, cargoes lost their rotation freedom at the late stage of internalization; (2) cargoes performed train-like motion when they were transported along the microtubule network by motor proteins inside live cells; (3) During the pause stage of fast axonal transport, cargoes were still bound to the microtubule tracks by motor proteins. Total internal reflection fluorescence microscopy (TIRFM) is another non-invasive and far-field optical imaging technique. Because of its near-field illumination mechanism, TIRFM has better axial resolution than epi-fluorescence microscopy and confocal microscopy. In this work, an auto-calibrated, prism type, angle-scanning TIRFM instrument was built. The incident angle can range from subcritical angles to nearly 90{sup o}, with an angle interval less than 0.2{sup o}. The angle precision of the new instrument was demonstrated through the finding of the surface plasmon resonance (SPR) angle of metal film coated glass slide. The new instrument improved significantly the precision in determining the axial position. As a result, the best obtained axial resolution was {approx} 8 nm, which is better than current existing instruments similar in function. The instrument was further modified to function as a pseudo TIRF microscope. The illumination depth can be controlled by changing the incident angle of the excitation laser beam or adjusting the horizontal position of the illumination laser spot on the prism top surface. With the new technique, i.e., variable-illumination-depth pseudo TIRF microscopy, the whole cell body from bottom to top was scanned.

  12. Microhole Smart Steering and Logging While Drilling System

    SciTech Connect (OSTI)

    John Macpherson; Mathias Moeller; Thomas Gregg; Roland Chemali

    2006-06-30

    A background to Coiled Tubing Bottom Hole Assemblies (CT-BHA) is given, and the development of a resistivity measurement component, and a rib-steering motor component, is described. The successful operation of these components in both the laboratory and field environment is described. The primary conclusion of this development is that both components operate as anticipated within the CT-BHA, and significantly extend the possibility of drilling with coiled tubing in the microhole environment.

  13. West Coast drilling/production

    SciTech Connect (OSTI)

    Rintoul, B.

    1980-01-01

    Heavy California oil has come into its own as a likely source for increased production. The removal of price controls for crude 16 gravity and lower has given producers incentive, but obstacles remain in the regulatory atmosphere of uncertainty and confusion. Accelerated drilling operations in California aiming at heavy oil production are described. The Elk Hills field continues to be the main site of resurgence of California oil, and steamflooding is the primary method of recovery. Hot plate and hydraulic mining methods also are proposed for heavy oil recovery. Pacific Northwest activities outside of California also are mentioned.

  14. Proceedings of IADC Middle East Drilling Conference, Dubai, November 1998. 1 IADC Middle East Drilling Conference

    E-Print Network [OSTI]

    Aamodt, Agnar

    to 170 000 $ during 1985 - 1988, and represented 3 - 5 % of the total drilling costs. The cause of goingProceedings of IADC Middle East Drilling Conference, Dubai, November 1998. 1 IADC Middle East Drilling Conference Case-Based Reasoning, a method for gaining experience and giving advise on how to avoid

  15. Coiled tubing drilling with supercritical carbon dioxide

    DOE Patents [OSTI]

    Kolle , Jack J. (Seattle, WA)

    2002-01-01

    A method for increasing the efficiency of drilling operations by using a drilling fluid material that exists as supercritical fluid or a dense gas at temperature and pressure conditions existing at a drill site. The material can be used to reduce mechanical drilling forces, to remove cuttings, or to jet erode a substrate. In one embodiment, carbon dioxide (CO.sub.2) is used as the material for drilling within wells in the earth, where the normal temperature and pressure conditions cause CO.sub.2 to exist as a supercritical fluid. Supercritical carbon dioxide (SC--CO.sub.2) is preferably used with coiled tube (CT) drilling equipment. The very low viscosity SC--CO.sub.2 provides efficient cooling of the drill head, and efficient cuttings removal. Further, the diffusivity of SC--CO.sub.2 within the pores of petroleum formations is significantly higher than that of water, making jet erosion using SC--CO.sub.2 much more effective than water jet erosion. SC--CO.sub.2 jets can be used to assist mechanical drilling, for erosion drilling, or for scale removal. A choke manifold at the well head or mud cap drilling equipment can be used to control the pressure within the borehole, to ensure that the temperature and pressure conditions necessary for CO.sub.2 to exist as either a supercritical fluid or a dense gas occur at the drill site. Spent CO.sub.2 can be vented to the atmosphere, collected for reuse, or directed into the formation to aid in the recovery of petroleum.

  16. COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES

    E-Print Network [OSTI]

    Lamb, D.W.

    2013-01-01

    116 mm diameter holes would drill for both new and existingeach site. In this report. drill sizes are given in thethe equivalent. standard U.S. drill bit sizes. Table 1 shows

  17. Electric motor for laser-mechanical drilling

    DOE Patents [OSTI]

    Grubb, Daryl L.; Faircloth, Brian O.; Zediker, Mark S.

    2015-07-07

    A high power laser drilling system utilizing an electric motor laser bottom hole assembly. A high power laser beam travels within the electric motor for advancing a borehole. High power laser drilling system includes a down hole electrical motor having a hollow rotor for conveying a high power laser beam through the electrical motor.

  18. OCEAN DRILLING PROGRAM LEG 202 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 202 SCIENTIFIC PROSPECTUS SOUTHEAST PACIFIC PALEOCEANOGRAPHIC TRANSECTS, this source should be appropriately acknowledged. Ocean Drilling Program Scientific Prospectus No. 102 Publications homepage on the World Wide Web at: http://www-odp.tamu.edu/publications This publication

  19. OCEAN DRILLING PROGRAM LEG 118 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    ., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgemeinschaftOCEAN DRILLING PROGRAM LEG 118 SCIENTIFIC PROSPECTUS FRACTURE ZONE DRILLING ON THE SOUTHWEST INDIAN

  20. OCEAN DRILLING PROGRAM LEG 109 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Program which is managed by Joint Oceanographic Institutions, Inc., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of EnergyOCEAN DRILLING PROGRAM LEG 109 SCIENTIFIC PROSPECTUS BARE ROCK DRILLING IN THE MID-ATLANTIC RIDGE

  1. Multi-gradient drilling method and system

    DOE Patents [OSTI]

    Maurer, William C. (Houston, TX); Medley, Jr., George H. (Spring, TX); McDonald, William J. (Houston, TX)

    2003-01-01

    A multi-gradient system for drilling a well bore from a surface location into a seabed includes an injector for injecting buoyant substantially incompressible articles into a column of drilling fluid associated with the well bore. Preferably, the substantially incompressible articles comprises hollow substantially spherical bodies.

  2. OCEAN DRILLING PROGRAM LEG 158 PRELIMINARY REPORT

    E-Print Network [OSTI]

    Federal Republic of Germany Dr. Jay Miller Staff Scientist, Leg 158 Ocean Drilling Program Texas A/Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Greece, Iceland, Italy, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any

  3. A concept for marine shallow drilling Drill test from R/V Hkom Mosby in Nov. 1995 Commercial rig built by GeoDrilling

    E-Print Network [OSTI]

    Kristoffersen, Yngve

    built by GeoDrilling BACKGROUND There is a quantum leap between the costs of marine operations usingA concept for marine shallow drilling Drill test from R/V Håkom Mosby in Nov. 1995 Commercial rig conventional sediment coring devices with or without piston for 10-15 m of core recovery and drilling from

  4. Communication adapter for use with a drilling component

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Hall; Jr.; H. Tracy (Provo, UT); Bradford, Kline (Orem, UT); Rawle, Michael (Springville, UT)

    2007-04-03

    A communication adapter is disclosed that provides for removable attachment to a drilling component when the drilling component is not actively drilling and for communication with an integrated transmission system in the drilling component. The communication adapter comprises a data transmission coupler that facilitates communication between the drilling component and the adapter, a mechanical coupler that facilitates removable attachment of the adapter to the drilling component, and a data interface.

  5. Development of Extraction Techniques for the Detection of Signature Lipids from Oil

    SciTech Connect (OSTI)

    Borglin, Sharon; Geller, Jil; Chakraborty, Romy; Hazen, Terry; Mason, Olivia

    2010-05-17

    Pure cultures, including Desulfovibrio vulgaris and Methanococcus maripaludus, were combined with model oil samples and oil/diesel mixtures to optimize extraction techniques of signature lipids from oil in support of investigation of microbial communities in oil deposit samples targets for microbial enhanced hydrocarbon recovery. Several techniques were evaluated, including standard phospholipid extraction, ether linked lipid for Archaeal bacterial detection, and high pressure extractiontechniques. Recovery of lipids ranged from 50-80percent as compared to extraction of the pure culture. Extraction efficiency was evaluated by the use of internal standards. Field samples will also be tested for recovery of signature lipids with optimized extraction techniques.

  6. Evolution of coiled tubing drilling technology accelerates

    SciTech Connect (OSTI)

    Simmons, J.; Adam, B.

    1993-09-01

    This paper reviews the status of coiled tubing technology in oil and gas drilling operations. The paper starts with a description of current coiled tubing technology and provides a cost comparison between conventional and coiled tubing drilling. The results show that offshore operations are already competitive while onshore operations will still lag behind conventional drilling methods. A list of known coiled tubing drilling operations is provided which gives the current borehole diameters and depths associated with this technology. The paper then goes on to provide the advantages and disadvantages of the technology. The advantages include improved well control, a continuous drillstring, reduced mobilization costs, simplified logging and measurement-while drilling measurements, and less tripping required. The disadvantages include high friction with the borehole wall, downhole motors required, limited drillhole size, and fatigued or damaged sections of the tubing cannot be removed. Finally, a review of the reliability of this technology is provided.

  7. European Geothermal Drilling Experience-Problem Areas and Case...

    Office of Scientific and Technical Information (OSTI)

    Drilling Experience-Problem Areas and Case Studies Baron, G.; Ungemach, P. 15 GEOTHERMAL ENERGY; BOREHOLES; DRILLING; EVALUATION; EXPLORATION; GEOTHERMAL RESOURCES; ITALY;...

  8. COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES

    E-Print Network [OSTI]

    Lamb, D.W.

    2013-01-01

    diameter shaft by conventional drilling, blasting andconventional shaft sinking method, which is the most common method of shaft excavation, involves the drilling and

  9. Fundamental Research on Percussion Drilling: Improved rock mechanics

    Office of Scientific and Technical Information (OSTI)

    full-scale laboratory investigations Michael S. Bruno 58 GEOSCIENCES; 02 PETROLEUM; 03 NATURAL GAS; ROCK DRILLING; PRESSURE DEPENDENCE; ROCK MECHANICS; ROTARY DRILLING; WELL...

  10. Type A Accident Investigation of the June 21, 2001, Drilling...

    Office of Environmental Management (EM)

    June 21, 2001, Drilling Rig Operator Injury at the Fermi National Accelerator Laboratory, August 2001 Type A Accident Investigation of the June 21, 2001, Drilling Rig Operator...

  11. Evaluation of Emerging Technology for Geothermal Drilling and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of Emerging Technology for Geothermal Drilling and Logging Applications Evaluation of Emerging Technology for Geothermal Drilling and Logging Applications Evaluation of...

  12. Development of high performance structure and ligand based virtual screening techniques 

    E-Print Network [OSTI]

    Shave, Steven R.

    2010-01-01

    Virtual Sreening (VS) is an in silico technique for drug discovery. An overview of VS methods is given and is seen to be approachable from two sides: structure based and ligand based. Structure based virtual screening ...

  13. Development of the in vitro gas production technique to estimate protein degradation in the rumen 

    E-Print Network [OSTI]

    Palmer, Matthew

    2006-01-01

    The purpose of this thesis was to adapt the in vitro gas production technique (IVGPT) to estimate the rumen degradation profile of feed protein and to investigate the effect of sample preparation on the estimated kinetics ...

  14. Development of Multiple Probe Microdialysis Sampling Techniques for Site-Specific Monitoring in the Stomach

    E-Print Network [OSTI]

    Woo, Kristin Lindsey

    2007-12-31

    Microdialysis sampling is a technique used extensively to monitor analytes within numerous tissues. Although the capability of implanting multiple probes into a single animal exists, typical experiments are performed using ...

  15. Development of techniques for quantum-enhanced laser-interferometric gravitational-wave detectors

    E-Print Network [OSTI]

    Goda, Keisuke

    2007-01-01

    A detailed theoretical and experimental study of techniques necessary for quantum-enhanced laser- interferometric gravitational wave (GW) detectors was carried out. The basic theory of GWs and laser-interferometric GW ...

  16. Procedures control total mud losses while drilling in deep water

    SciTech Connect (OSTI)

    Dewar, J. ); Halkett, D. )

    1993-11-01

    In the deepwater (830-1,000 m) drilling program offshore Philippines, reefal limestones were encountered in which total mud losses could be expected because of the presence of large fractures. The danger was that a sudden drop in hydrostatic head (resulting from the losses) could allow any natural gas to enter the well bore quickly. The gas could then migrate up the well bore and form hydrates in the blowout preventers (BOPs). Once hydrates form, they are difficult to remove and can make a BOP stack inoperable. To combat this potential problem, containment procedures were developed to cope with these fluid losses. The philosophy behind the procedures was to prevent hydrocarbons from entering the well bore and, if they did enter, to ensure that they did not move up the well bore and into the riser. Additionally, procedures were developed to allow drilling to continue during the losses and the curing of losses.

  17. Modeling and Adhesive Tool Wear in Dry Drilling of Aluminum Alloys

    SciTech Connect (OSTI)

    Girot, F.; Gutierrez-Orrantia, M. E.

    2011-01-17

    One of the challenges in aeronautic drilling operations is the elimination of cutting fluids while maintaining the quality of drilled parts. This paper therefore aims to increase the tool life and process quality by working on relationships existing between drilling parameters (cutting speed and feed rate), coatings and tool geometry. In dry drilling, the phenomenon of Built-Up Layer is the predominant damage mechanism. A model fitting the axial force with the cutting parameters and the damage has been developed. The burr thickness and its dispersion decrease with the feed rate. The current diamond coatings which exhibit a strong adhesion to the carbide substrate can limit this adhesive layer phenomenon. A relatively smooth nano-structured coating strongly limits the development of this layer.

  18. DEVELOPMENT OF PIV TECHNIQUE UNDER MAGNETIC FIELDS AND MEASUREMENT OF TURBULENT PIPE FLOW OF FLIBE SIMULANT FLUID

    E-Print Network [OSTI]

    Abdou, Mohamed

    reports a development of unique experimental techniques using aqueous solution of potassium hydroxide commercial nuclear fusion reactor.1 The main functions of the blankets for D-T fusion reactors are to breed shielding. An essential idea of a liquid breeder concept is that if a liquid containing lithium can

  19. A Component Approach to Collaborative Scientific Software Development: Tools and Techniques Utilized by the Quantum Chemistry Science Application Partnership

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kenny, Joseph P.; Janssen, Curtis L.; Gordon, Mark S.; Sosonkina, Masha; Windus, Theresa L.

    2008-01-01

    Cutting-edge scientific computing software is complex, increasingly involving the coupling of multiple packages to combine advanced algorithms or simulations at multiple physical scales. Component-based software engineering (CBSE) has been advanced as a technique for managing this complexity, and complex component applications have been created in the quantum chemistry domain, as well as several other simulation areas, using the component model advocated by the Common Component Architecture (CCA) Forum. While programming models do indeed enable sound software engineering practices, the selection of programming model is just one building block in a comprehensive approach to large-scale collaborative development which must also addressmore »interface and data standardization, and language and package interoperability. We provide an overview of the development approach utilized within the Quantum Chemistry Science Application Partnership, identifying design challenges, describing the techniques which we have adopted to address these challenges and highlighting the advantages which the CCA approach offers for collaborative development.« less

  20. Recent developments in (MEMS) fabrication techniques have exploited the properties of polymers.

    E-Print Network [OSTI]

    Zhang, Zongqin

    of polymers. Traditional lithographic techniques have been used to create a template in a thick layer of photoresist that can be filled with a heat -0r-UV curable polymer and used to cast numerous replicas of Tesla-isopropylacrylamide polymers have attracted much interest in the area of scientific research and microfluidic technologies due

  1. Development of Innovative Radioactive Isotope Production Techniques at the Pennsylvania State University Radiation Science and Engineering Center

    SciTech Connect (OSTI)

    Johnsen, Amanda M.; Heidrich, Brenden; Durrant, Chad; Bascom, Andrew; Unlu, Kenan

    2013-08-15

    The Penn State Breazeale Nuclear Reactor (PSBR) at the Radiation Science and Engineering Center (RSEC) has produced radioisotopes for research and commercial purposes since 1956. With the rebirth of the radiochemistry education and research program at the RSEC, the Center stands poised to produce a variety of radioisotopes for research and industrial work that is in line with the mission of the DOE Office of Science, Office of Nuclear Physics, Isotope Development and Production Research and Application Program. The RSEC received funding from the Office of Science in 2010 to improve production techniques and develop new capabilities. Under this program, we improved our existing techniques to provide four radioisotopes (Mn-56, Br-82, Na-24, and Ar-41) to researchers and industry in a safe and efficient manner. The RSEC is also working to develop new innovative techniques to provide isotopes in short supply to researchers and others in the scientific community, specifically Cu-64 and Cu-67. Improving our existing radioisotopes production techniques and investigating new and innovative methods are two of the main initiatives of the radiochemistry research program at the RSEC.

  2. Property:ExplorationPermitAgency-Drilling | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to: navigation,Property Edit with formExplorationParentTechniqueDrilling Jump

  3. Property:ExplorationPermitAgency-PreDrilling | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to: navigation,Property Edit with formExplorationParentTechniqueDrilling

  4. Acronyms and Abbreviations Used in the Ocean Drilling Program

    E-Print Network [OSTI]

    Stone Soup Acronyms and Abbreviations Used in the Ocean Drilling Program Ocean Drilling Program Texas A&M University Technical Note No. 13 Compiled by Elizabeth A. Heise Ocean Drilling Program Texas A orpersonalresearchpurposes; however,republicationof any portion requires the written consent of the Director, Ocean Drilling

  5. Los Alamos computer simulation improves offshore drill rig safety

    E-Print Network [OSTI]

    - 1 - Los Alamos computer simulation improves offshore drill rig safety May 1, 2015 Los Alamos for offshore deep water oil drilling is a challenging task because drilling starts deep under the sea surface to minimize the motion of drilling platforms caused by vortex shedding from ocean currents. Vortex shedding

  6. Integrated Ocean Drilling Program U.S. Implementing Organization

    E-Print Network [OSTI]

    Integrated Ocean Drilling Program U.S. Implementing Organization FY10 Annual Report #12;Crane ball #12;The Integrated Ocean Drilling Program (IODP) is an international marine research program Drilling Project (DSDP) and the Ocean Drilling Program (ODP), programs that revolutionized our view

  7. Integrated Ocean Drilling Program U.S. Implementing Organization

    E-Print Network [OSTI]

    Integrated Ocean Drilling Program U.S. Implementing Organization FY09 Annual Report #12;Discrete core sampling #12;The Integrated Ocean Drilling Program (IODP) is an international marine research successes of the Deep Sea Drilling Project (DSDP) and the Ocean Drilling Program (ODP), programs

  8. Integrated Ocean Drilling Program U.S. Implementing Organization

    E-Print Network [OSTI]

    Integrated Ocean Drilling Program U.S. Implementing Organization FY13 Annual Report #12;Tripping Integrated Ocean Drilling Program (IODP) monitored subseafloor environments and explored Earth's history Drilling Project (DSDP) and the Ocean Drilling Program (ODP), which revolutionized our view of Earth

  9. Drilling long geodesics in hyperbolic 3-manifolds K. Bromberg

    E-Print Network [OSTI]

    Bromberg, Kenneth

    Drilling long geodesics in hyperbolic 3-manifolds K. Bromberg September 22, 2006 1 Introduction to such a deformation as drilling and results which compare the geometry of the original manifold to the geometry of the drilled manifold as drilling theorems. The first results of this type are due to Hodgson and Kerckhoff

  10. DIRECTIONAL PROPAGATION CANCELLATION FOR ACOUSTIC COMMUNICATION ALONG THE DRILL STRING

    E-Print Network [OSTI]

    DIRECTIONAL PROPAGATION CANCELLATION FOR ACOUSTIC COMMUNICATION ALONG THE DRILL STRING Sinan along the drill string to the surface. Normal drilling operations produce in-band acoustic noise at intensities comparable to the transducer output while lossy propagation through the drill string and surface

  11. Small diameter horizontal hole drilling - state of technology

    SciTech Connect (OSTI)

    NONE

    1984-11-01

    The purpose of this study is to determine the existing state of the art for small diameter, horizontal pilot hole drilling. The data were collected by contacting worldwide owners of raise or slant hole drill equipment, manufacturers of drills and bits, and manufacturers of survey tools. The study was limited to existing equipment and completed trials. Most attempts at directional pilot hole drilling, and most survey tools are designed for near vertical, downward drilling. Several types of controllable bits are available which depend upon in-hole motors and bent or wedged assemblies to bias the direction of drilling. Accurate horizontal drilling can be achieved in this way by alternately drilling and surveying at frequent intervals. This procedure is impractical, however, from both a production and a cost standpoint. A few attempts at directional drilling have been made using ordinary drilling tools, a rotary drill string and a tricone bit. Good equipment and a well trained drill crew appeared to be the most significant factor in practical, accurate drilling, whether horizontal or vertical. Because of the cost, no one uses steerable bit drilling except for correction, and then only for short portions of an overall drill program. No satisfactory continuous readout surveying tool, coupled with a remotely controlled bit capable of direction correction, exists. An industry need exists for a high speed, directional drill bit, coupled with a continuously monitored survey tool. 2 tables.

  12. INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization

    E-Print Network [OSTI]

    INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization JOI Alliance Joint....................................................................................................................26 Organizational Chart Organizational Chart

  13. Applications of CBR in oil well drilling "A general overview"

    E-Print Network [OSTI]

    Aamodt, Agnar

    in drilling operations indicates that this is a potential method to reduce cost of drilling, and increase drilling of an oil well is also an expensive operation, costing typically 250,000 US$ per day per rigApplications of CBR in oil well drilling "A general overview" Samad Valipour Shokouhi1,3 , Agnar

  14. Exploration geothermal gradient drilling, Platanares, Honduras, Central America

    SciTech Connect (OSTI)

    Goff, S.J.; Laughlin, A.W.; Ruefenacht, H.D.; Goff, F.E.; Heiken, G.; Ramos, N.

    1988-01-01

    This paper is a review and summary of the core drilling operations component of the Honduras Geothermal Resource Development Project at the Platanares geothermal prospect in Honduras, Central America. Three intermediate depth (428 to 679 m) coreholes are the first continuously cored geothermal exploration boreholes in Honduras. These coring operations are part of the Central America Energy Resource Project (CAERP) effort funded by the Agency for International Development (AID) and implemented by the Los Alamos National Laboratory (Los Alamos) in cooperation with the Empresa Nacional de Energia Electrica (ENEE) and the United States Geological Survey (USGS). This report emphasizes coring operations with reference to the stratigraphy, thermal gradient, and flow test data of the boreholes. The primary objectives of this coring effort were (1) to obtain quantitative information on the temperature distribution as a function of depth, (2) to recover fluids associated with the geothermal reservoir, (3) to recover 75% or better core from the subsurface rock units, and (4) to drill into the subsurface rock as deeply as possible in order to get information on potential reservoir rocks, fracture density, permeabilities, and alteration histories of the rock units beneath the site. The three exploration coreholes drilled to depths of 650, 428 and 679 m, respectively, encountered several hot water entries. Coring operations and associated testing began in mid-October 1986 and were completed at the end of June 1987.

  15. FAST CARS Developing a Laser Spectroscopic Technique for Rapid Identification of Bacterial Spores

    E-Print Network [OSTI]

    Scully, M O; Lucht, R P; Opatrny, T; Pilloff, H; Rebane, A; Sokolov, A V; Zubairy, M S

    2002-01-01

    Airborne contaminants, e.g., bacterial spores, are usually analyzed by time consuming microscopic, chemical and biological assays. Current research into real time laser spectroscopic detectors of such contaminants is based on e.g. resonant Raman spectroscopy. The present approach derives from recent experiments in which atoms and molecules are prepared by one (or more) coherent laser(s) and probed by another set of lasers. The connection with previous studies based on "Coherent Anti-Stokes Raman Spectroscopy" (CARS) is to be noted. However generating and utilizing maximally coherent oscillation in macromolecules having an enormous number of degrees of freedom is much more challenging. This extension of the CARS technique is called FAST CARS (Femtosecond Adaptive Spectroscopic Techniques for Coherent Anti-Stokes Raman Spectroscopy), and the present paper proposes and analyses ways in which it could be used to rapidly identify pre-selected molecules in real time.

  16. Development and application of the scintillation flask technique for the measurement of indoor radon-222 concentrations 

    E-Print Network [OSTI]

    Vasquez, Gerard Michael

    1986-01-01

    Collection . Sample Counting . Data Reduction Flask Storage . Inadequacies of the Scintillation Flask Technique RESULTS Results of Flask Calibrations Suessary of Campus Results Location of Higher Radon Levels DISCUSSION AND CONCLUSIONS Calibration...-222 Concentration versus Time . 32 INTRODUCTION The potential health effects of Rn-222 and its daughters have been a major concern for several years. Radon-222, a daughter of Ra-226, is a naturally occurring, radioactive, noble gas with a 3. 8 day...

  17. Development of a rapid and efficient microinjection technique for gene insertion into fertilized salmonid eggs

    SciTech Connect (OSTI)

    Chandler, D.P.; Welt, M.; Leung, F.C.

    1990-10-01

    An efficient one-step injection technique for gene insertion into fertilized rainbow trout (Oncorhynchus mykiss) eggs is described, and basic parameters affecting egg survival are reported. Freshly fertilized rainbow trout eggs were injected in the perivitelline space with a recombinant mouse metallothionein-genomic bovine growth hormone (bGH) DNA construct using a 30-gauge hypodermic needle and a standard microinjection system. Relative to control, site of injection and DNA concentration did not affect the egg survival, but injections later than 3--4 hours post fertilization were detrimental. The injection technique permitted treatment of 100 eggs/hr with survivals up to 100%, resulting in a 4% DNA uptake rate as indicated by DNA dot blot analysis. Positive dot blot results also indicated that the injected DNA is able to cross the vitelline membrane and persist for 50--60 days post hatching, obviating the need for direct injection into the germinal disk. Results are consistent with previous transgenic fish work, underscoring the usefulness of the technique for generating transgenic trout and salmonids. 24 refs., 6 figs., 3 tabs.

  18. Limitations of extended reach drilling in deepwater 

    E-Print Network [OSTI]

    Akinfenwa, Akinwunmi Adebayo

    2000-01-01

    As the worldwide search for hydrocarbons continues into the deepwater of the oceans, drilling extended reach wells have helped to drain the fields in the most cost effective way, thus providing the oil and gas industry the cushion to cope...

  19. OCEAN DRILLING PROGRAM LEG 115 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    ., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgemeinschaftOCEAN DRILLING PROGRAM LEG 115 SCIENTIFIC PROSPECTUS MASCARENE PLATEAU - CARBONATE DISSOLUTION

  20. Formation damage in underbalanced drilling operations 

    E-Print Network [OSTI]

    Reyes Serpa, Carlos Alberto

    2003-01-01

    Formation damage has long been recognized as a potential source of reduced productivity and injectivity in both horizontal and vertical wells. From the moment that the pay zone is being drilled until the well is put on production, a formation...

  1. OCEAN DRILLING PROGRAM LEG 156 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 156 SCIENTIFIC PROSPECTUS NORTHERN BARBADOS RIDGE Dr. Tom Shipley Dr The main objectives of the northern Barbados Ridge ODP Leg 156 are to examine the rates, effects

  2. Offshore Drilling Safety and Response Technologies | Department...

    Office of Environmental Management (EM)

    are anticipated to come from onshore enhanced oil recovery projects, shale oil plays, and deepwater drilling in the Gulf of Mexico. They also project that U.S. dependence on...

  3. OCEAN DRILLING PROGRAM LEG 100 REPORT

    E-Print Network [OSTI]

    Louis E. Garrison Co-Chief Scientist, Leg 100 Ocean Drilling Program Texas A&M University College Operations Louis E. Garrison Deputy Director ODP/TAMU July 1985 #12;Material in this publication may

  4. OCEAN DRILLING PROGRAM LEG 132 ENGINEERING PROSPECTUS

    E-Print Network [OSTI]

    Drilling Program (Belgium, Denmark, Finland, Iceland, Italy, Greece, the Netherlands, Norway, Spain, Sweden) the concept of deploying a mining- type diamond coring system (DCS) from a floating vessel was demonstrated

  5. OCEAN DRILLING PROGRAM LEG 193 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    -Chief Scientist CSIRO Division of Exploration and Mining P.O. Box 136, North Ryde NSW 2113 Australia Kingdom) European Science Foundation Consortium for Ocean Drilling (Belgium, Denmark, Finland, Iceland

  6. OCEAN DRILLING PROGRAM LEG 127 PRELIMINARY REPORT

    E-Print Network [OSTI]

    for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany) Institut Français, Iceland, Italy, Greece, the Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any opinions (Geochemisches Institut, Goldschmidtstr. 1, D-3400 Gottingen, Federal Republic of Germany) Charlotte A. Brunner

  7. OCEAN DRILLING PROGRAM LEG 158 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Federal Republic of Germany Dr. Laura Stokking Staff Scientist, Leg 158 Ocean Drilling Program Texas A Deutsche Forschungsgemeinschaft (Federal Republic of Germany) Institut Français de Recherche pour 1, Norway, Spain, Sweden, Switzerland, and Turkey) Any opinions, findings, and conclusions

  8. NUMBER1,2005 Published by the Integrated Ocean Drilling Program with the International Continental Scientific Drilling Program

    E-Print Network [OSTI]

    Gilli, Adrian

    NUMBER1,2005 Published by the Integrated Ocean Drilling Program with the International Continental Scientific Drilling Program No.14,September2012 ScientificDrilling ISSN: 1816-8957 Exp. 333: Nankai Trough Subduction Input and Records of Slope Instability 4 Lake Drilling In Eastern Turkey 18 Exp. 326 and 332: Nan

  9. Use of Downhole Motors in Geothermal Drilling in the Philippines

    SciTech Connect (OSTI)

    Pyle, D. E.

    1981-01-01

    This paper describes the use of downhole motors in the Tiwi geothermal field in the Philippines, The discussion includes the application Of a Dyna-Drill with insert-type bits for drilling through surface alluvium. The economics of this type of drilling are compared to those of conventional rotary drilling. The paper also describes the use of a turbodrill that drills out scale as the well produces geothermal fluids.

  10. New ALS Technique Guides IBM in Next-Generation Semiconductor Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJessework usesofPublications TheScience4.21ReviewsEarlyALS Technique GivesNewNew

  11. Incorporating modern development and evaluation techniques into the creation of large-scale, spacecraft control software

    E-Print Network [OSTI]

    Weiss, Kathryn Anne, 1979-

    2006-01-01

    One of the major challenges facing the development of today's safety- and mission-critical space systems involves the construction of software to support the goals and objectives of these missions, especially those associated ...

  12. Development of novel laser diagnostic techniques for the quantitative study of premixed flames

    E-Print Network [OSTI]

    Chrystie, Robin Simon Macpherson

    2009-01-01

    for computational fluid dynamical (CFD) models in technical combustion. The work comprises of a number of related studies, to address problems of relevance in the field of combustion research. The first part of this work involves the development and testing...

  13. Development of experimental verification techniques for non-linear deformation and fracture.

    SciTech Connect (OSTI)

    Moody, Neville Reid; Bahr, David F. (Washington State University, Pullman, WA)

    2003-12-01

    This project covers three distinct features of thin film fracture and deformation in which the current experimental technique of nanoindentation demonstrates limitations. The first feature is film fracture, which can be generated either by nanoindentation or bulge testing thin films. Examples of both tests will be shown, in particular oxide films on metallic or semiconductor substrates. Nanoindentations were made into oxide films on aluminum and titanium substrates for two cases; one where the metal was a bulk (effectively single crystal) material and the other where the metal was a 1 pm thick film grown on a silica or silicon substrate. In both cases indentation was used to produce discontinuous loading curves, which indicate film fracture after plastic deformation of the metal. The oxides on bulk metals fractures occurred at reproducible loads, and the tensile stress in the films at fracture were approximately 10 and 15 GPa for the aluminum and titanium oxides respectively. Similarly, bulge tests of piezoelectric oxide films have been carried out and demonstrate film fracture at stresses of only 100's of MPa, suggesting the importance of defects and film thickness in evaluating film strength. The second feature of concern is film adhesion. Several qualitative and quantitative tests exist today that measure the adhesion properties of thin films. A relatively new technique that uses stressed overlayers to measure adhesion has been proposed and extensively studied. Delamination of thin films manifests itself in the form of either telephone cord or straight buckles. The buckles are used to calculate the interfacial fracture toughness of the film-substrate system. Nanoindentation can be utilized if more energy is needed to initiate buckling of the film system. Finally, deformation in metallic systems can lead to non-linear deformation due to 'bursts' of dislocation activity during nanoindentation. An experimental study to examine the structure of dislocations around indentations has been carried out to demonstrate the effectiveness in evaluating cross slip and dislocation behavior around nanoindentation impressions in bulk engineering alloys.

  14. National forecast for geothermal resource exploration and development with techniques for policy analysis and resource assessment

    SciTech Connect (OSTI)

    Cassel, T.A.V.; Shimamoto, G.T.; Amundsen, C.B.; Blair, P.D.; Finan, W.F.; Smith, M.R.; Edeistein, R.H.

    1982-03-31

    The backgrund, structure and use of modern forecasting methods for estimating the future development of geothermal energy in the United States are documented. The forecasting instrument may be divided into two sequential submodels. The first predicts the timing and quality of future geothermal resource discoveries from an underlying resource base. This resource base represents an expansion of the widely-publicized USGS Circular 790. The second submodel forecasts the rate and extent of utilization of geothermal resource discoveries. It is based on the joint investment behavior of resource developers and potential users as statistically determined from extensive industry interviews. It is concluded that geothermal resource development, especially for electric power development, will play an increasingly significant role in meeting US energy demands over the next 2 decades. Depending on the extent of R and D achievements in related areas of geosciences and technology, expected geothermal power development will reach between 7700 and 17300 Mwe by the year 2000. This represents between 8 and 18% of the expected electric energy demand (GWh) in western and northwestern states.

  15. Multilayer co-extrusion technique for developing high energy density organic devices.

    SciTech Connect (OSTI)

    Spangler, Scott W.; Schroeder, John Lee; Mrozek, Randy; Bieg, Lothar Franz; Rao, Rekha Ranjana; Lenhart, Joseph Ludlow; Stavig, Mark Edwin; Cole, Phillip James; Mondy, Lisa Ann; Winter, Michael R.; Schneider, Duane Allen

    2009-11-01

    The purpose of this project is to develop multi-layered co-extrusion (MLCE) capabilities at Sandia National Laboratories to produce multifunctional polymeric structures. Multi-layered structures containing layers of alternating electrical, mechanical, optical, or structural properties can be applied to a variety of potential applications including energy storage, optics, sensors, mechanical, and barrier applications relevant to the internal and external community. To obtain the desired properties, fillers must be added to the polymer materials that are much smaller than the end layer thickness. We developed two filled polymer systems, one for conductive layers and one for dielectric layers and demonstrated the potential for using MLCE to manufacture capacitors. We also developed numerical models to help determine the material and processing parameters that impact processing and layer stability.

  16. Method and apparatus of assessing down-hole drilling conditions

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Pixton, David S. (Lehl, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Fox, Joe (Spanish Fork, UT)

    2007-04-24

    A method and apparatus for use in assessing down-hole drilling conditions are disclosed. The apparatus includes a drill string, a plurality of sensors, a computing device, and a down-hole network. The sensors are distributed along the length of the drill string and are capable of sensing localized down-hole conditions while drilling. The computing device is coupled to at least one sensor of the plurality of sensors. The data is transmitted from the sensors to the computing device over the down-hole network. The computing device analyzes data output by the sensors and representative of the sensed localized conditions to assess the down-hole drilling conditions. The method includes sensing localized drilling conditions at a plurality of points distributed along the length of a drill string during drilling operations; transmitting data representative of the sensed localized conditions to a predetermined location; and analyzing the transmitted data to assess the down-hole drilling conditions.

  17. Learning by Drilling: Inter-Firm Learning and Relationship Persistence in the Texas Oilpatch

    E-Print Network [OSTI]

    KELLOGG, RYAN M

    2007-01-01

    in this industry. Drilling cost-efficiency, driven almostcorrelation between drilling cost and experience. ProducersIn practice, drilling engineers achieve cost savings almost

  18. Learning by Drilling: Inter-Firm Learning and Relationship Persistence in the Texas Oilpatch

    E-Print Network [OSTI]

    KELLOGG, RYAN M

    2007-01-01

    and Henry Licis, “Improving Drilling Performance ThroughJ.F. and K.K. Millheim, “The Drilling Performance Curve: AYardstick for Judging Drilling Performance,” Society of

  19. Learning by Drilling: Inter-Firm Learning and Relationship Persistence in the Texas Oilpatch

    E-Print Network [OSTI]

    KELLOGG, RYAN M

    2007-01-01

    correlation between drilling cost and experience. Producersin this industry. Drilling cost-efficiency, driven almostIn practice, drilling engineers achieve cost savings almost

  20. New coiled-tubing cementing techniques at Prudhoe developed to withstand higher differential pressure

    SciTech Connect (OSTI)

    Krause, R.E.; Reem, D.C. )

    1993-11-01

    The successful hydraulic fracturing program at Prudhoe Bay would not have been possible without an effective coiled-tubing-unit (CTU) cement-squeeze program. Many fracture stimulation candidates were wells that have been squeezed previously. Therefore, squeezed perforations were exposed to higher differential pressures during fracturing operations than normally were seen at Prudhoe. At the outset of the fracture stimulation program in 1990, squeeze perforations failed when subjected to fracture job pressures. It quickly became clear that more aggressive CTU squeeze techniques resulting in stronger squeezed perforations would be necessary if the Prudhoe fracture program were to achieve its goals. Arco Alaska Inc. implemented a more aggressive CTU squeeze program in the Eastern Operating Area (EOA) in mid-1990. This paper documents the results of the new squeeze program, in which increased surface coiled-tubing squeeze pressures from 1,500 to 3,500 psi for 1 hour were used. More resilient, acid-resistant latex cement also became the standard in late 1990 for squeeze cementing. Implementation of this program has resulted in a squeeze success rate approaching 90%.

  1. Development of novel separation techniques for biological samples in capillary electrophoresis

    SciTech Connect (OSTI)

    Chang, H.T.

    1994-07-27

    This dissertation includes three different topics: general introduction of capillary electrophoresis (CE); gradient in CE and CE in biological separations; and capillary gel electrophoresis (CGE) for DNA separation. Factors such as temperature, viscosity, pH, and the surface of capillary walls affecting the separation performance are demonstrated. A pH gradient between 3.0 and 5.2 is useful to improve the resolution among eight different organic acids. A flow gradient due to the change in the concentration of surfactant, which is able to coat to the capillary wall to change the flow rate and its direction, is also shown as a good way to improve the resolution for organic compounds. A temperature gradient caused by joule heat is shown by voltage programming to enhance the resolution and shorten the separation time for several phenolic compounds. The author also shows that self-regulating dynamic control of electroosmotic flow in CE by simply running separation in different concentrations of surfactant has less matrix effect on the separation performance. One of the most important demonstrations in this dissertation is that the author proposes on-column reaction which gives several advantages including the use of a small amount of sample, low risk of contamination, and time saving and kinetic features. The author uses this idea with laser induced fluorescence (LIF) as a detection mode to detect an on-column digestion of sub-ng of protein. This technique also is applied to single cell analysis in the group.

  2. Development of Reservoir Characterization Techniques and Production Models for Exploiting Naturally Fractured Reservoirs

    SciTech Connect (OSTI)

    Wiggins, Michael L; Brown, Raymon L.; Civan, Faruk; Hughes, Richard G.

    2002-10-08

    During this reporting period, research was continued on characterizing and modeling the behavior of naturally fractured reservoir systems. This report proposed a model to relate the seismic response to production data to determine crack spacing and aperture, provided details of tests of proposed models to obtain fracture properties from conventional well logs with actual field data, and verification of the naturally fractured reservoir simulator developed in this project.

  3. Application of powder metallurgy techniques for the development of non-toxic ammunition. Final CRADA report

    SciTech Connect (OSTI)

    Lowden, R.; Kelly, R.

    1997-05-30

    The purpose of the Cooperative Research and Development Agreement (CRADA) between Martin Marietta Energy Systems, Inc., and Delta Frangible Ammunition (DFA), was to identify and evaluate composite materials for the development of small arms ammunition. Currently available small arms ammunition utilizes lead as the major component of the projectile. The introduction of lead into the environment by these projectiles when they are expended is a rapidly increasing environmental problem. At certain levels, lead is a toxic metal to the environment and a continual health and safety concern for firearm users as well as those who must conduct lead recovery operations from the environment. DFA is a leading supplier of high-density mixtures, which will be used to replace lead-based ammunition in specific applications. Current non-lead ammunition has several limitations that prevent it from replacing lead-based ammunition in many applications (such as applications that require ballistics, weapon recoil, and weapon function identical to that of lead-based ammunition). The purpose of the CRADA was to perform the research and development to identify cost-effective materials to be used in small arms ammunition that eventually will be used in commercially viable, environmentally conscious, non-lead, frangible and/or non-frangible, ammunition.

  4. Use of coiled tubing during the Wytch Farm extended-reach drilling project

    SciTech Connect (OSTI)

    Summers, T.; Larsen, H.A.; Redway, M.; Hill, G.

    1995-05-01

    The largest onshore oil field in western Europe is in an environmentally sensitive coastal area in southern England. Initial development of the field in the late 1970`s focused on accessing reserves underlying the onshore section of the reservoir. In 1989, various development options were screened to access the offshore section of the reservoir, containing {approx} 80 million bbl of recoverable oil. In 1991, the decision was made to access these reserves through extended-reach drilling (ERD) from an existing onshore wellsite. This development is currently under way, with 3 of 11 planned wells already drilled and producing. This paper describes the application of coiled tubing (CT) in the logging and completion phases of the ERD wells drilled to date. Conclusions are made as to the value of coiled tubing in ERD wells to minimize rig time and the current limits of technology.

  5. The use of coiled tubing during the Wytch Farm extended reach drilling project

    SciTech Connect (OSTI)

    Summers, T.; Larsen, H.A.; Redway, M.; Hill, G.

    1994-12-31

    The largest onshore oilfield in Western Europe is situated in an environmentally sensitive coastal area on the south coast of England. Initial development of the field in the late 1970`s focused on accessing reserves underlying the onshore section of the reservoir. In 1989, various development options were screened to access the offshore section of the reservoir, containing some 80 million barrels of recoverable oil. In 1991, the decision was made to access these reserves through extended reach drilling (ERD) from an existing onshore well-site. This development is currently underway, with three out of a planned eleven wells already drilled and producing. This paper will describe the application of Coiled Tubing in the logging and completion phases of the ERD wells drilled to date.

  6. Particle Imaging Velocimetry Technique Development for Laboratory Measurement of Fracture Flow Inside a Pressure Vessel Using Neutron Imaging

    SciTech Connect (OSTI)

    Polsky, Yarom; Bingham, Philip R; Bilheux, Hassina Z; Carmichael, Justin R

    2015-01-01

    This paper will describe recent progress made in developing neutron imaging based particle imaging velocimetry techniques for visualizing and quantifying flow structure through a high pressure flow cell with high temperature capability (up to 350 degrees C). This experimental capability has great potential for improving the understanding of flow through fractured systems in applications such as enhanced geothermal systems (EGS). For example, flow structure measurement can be used to develop and validate single phase flow models used for simulation, experimentally identify critical transition regions and their dependence on fracture features such as surface roughness, and study multiphase fluid behavior within fractured systems. The developed method involves the controlled injection of a high contrast fluid into a water flow stream to produce droplets that can be tracked using neutron radiography. A description of the experimental setup will be provided along with an overview of the algorithms used to automatically track droplets and relate them to the velocity gradient in the flow stream. Experimental results will be reported along with volume of fluids based simulation techniques used to model observed flow.

  7. Data transmission element for downhole drilling components

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

    2006-01-31

    A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

  8. Development of a novel technique to assess the vulnerability of micro-mechanical system components to environmentally assisted cracking.

    SciTech Connect (OSTI)

    Enos, David George; Goods, Steven Howard

    2006-11-01

    Microelectromechanical systems (MEMS) will play an important functional role in future DOE weapon and Homeland Security applications. If these emerging technologies are to be applied successfully, it is imperative that the long-term degradation of the materials of construction be understood. Unlike electrical devices, MEMS devices have a mechanical aspect to their function. Some components (e.g., springs) will be subjected to stresses beyond whatever residual stresses exist from fabrication. These stresses, combined with possible abnormal exposure environments (e.g., humidity, contamination), introduce a vulnerability to environmentally assisted cracking (EAC). EAC is manifested as the nucleation and propagation of a stable crack at mechanical loads/stresses far below what would be expected based solely upon the materials mechanical properties. If not addressed, EAC can lead to sudden, catastrophic failure. Considering the materials of construction and the very small feature size, EAC represents a high-risk environmentally induced degradation mode for MEMS devices. Currently, the lack of applicable characterization techniques is preventing the needed vulnerability assessment. The objective of this work is to address this deficiency by developing techniques to detect and quantify EAC in MEMS materials and structures. Such techniques will allow real-time detection of crack initiation and propagation. The information gained will establish the appropriate combinations of environment (defining packaging requirements), local stress levels, and metallurgical factors (composition, grain size and orientation) that must be achieved to prevent EAC.

  9. Middle East sparking increase in world drilling

    SciTech Connect (OSTI)

    Not Available

    1990-02-01

    Global drilling outside the United States appears to have bottomed out last year if official numbers and estimates supplied to World oil prove accurate. The 1990:0090 forecast calls for a 7.8% boost to 22,316 wells (excluding the USSR, Eastern Europe and North Korea), and every region expects to see a net increase. Figures provided by governmental agencies, operating companies and other sources indicate Middle Eastern drilling last year hit a new high for the 1980's with 948 wells. These figures are also given for Western Europe, the Far East, Africa, South America, Canada, Mexico, Costa Rica, and Guatemala.

  10. A study of fatigue in drill collars 

    E-Print Network [OSTI]

    Fowler, Joe Robert

    1969-01-01

    equipped with -S/N- Fatigue Life Gages, and finally made up to 7, 000 ft-lb of torque. The test connec- tion, now in essence one piece, was filled with water for purposes of crack detection, and installed in the test machine. The test connectors had...A STUDY OF FATIGUE IN DRILL COLLARS A Thesis by Joe Robert Feeler Approved as to style and content by: Chairman of Committee Head of Department Member /n/X~l~~ Member Member January 1969 ABSTRACT A Study of Fatigue in Drill Collars...

  11. Feasibility study of tuned-resonator, pulsating cavitating water jet for deep-hole drilling

    SciTech Connect (OSTI)

    Johnson, V.E. Jr.; Lindenmuth, W.T.; Conn, A.F.; Frederick, G.S.

    1981-08-01

    This study presents the advantages of pulsing a submerged jet to increase its erosion capability (particularly as caused by cavitation) in augmenting deep-hole drill bits. Various methods of accomplishing the pulsation are presented and discussed. The most attractive systems uncovered are acoustic oscillators which passively accomplish pulsations in the flow at frequencies corresponding to a Strouhal number in the range of 0.2 to 1.0. Such passive oscillators are assessed to be feasible candidates for development into practical deep hole drill bit systems and a long range plan for this research and development is presented and discussed.

  12. Continuous injection of an inert gas through a drill rig for drilling into potentially hazardous areas

    DOE Patents [OSTI]

    McCormick, Steve H. (Idaho Falls, ID); Pigott, William R. (Idaho Falls, ID)

    1997-01-01

    A drill rig for drilling in potentially hazardous areas includes a drill having conventional features such as a frame, a gear motor, gear box, and a drive. A hollow rotating shaft projects through the drive and frame. An auger, connected to the shaft is provided with a multiplicity of holes. An inert gas is supplied to the hollow shaft and directed from the rotating shaft to the holes in the auger. The inert gas flows down the hollow shaft, and then down the hollow auger and out through the holes in the bottom of the auger into the potentially hazardous area.

  13. Continuous injection of an inert gas through a drill rig for drilling into potentially hazardous areas

    DOE Patents [OSTI]

    McCormick, S.H.; Pigott, W.R.

    1997-12-30

    A drill rig for drilling in potentially hazardous areas includes a drill having conventional features such as a frame, a gear motor, gear box, and a drive. A hollow rotating shaft projects through the drive and frame. An auger, connected to the shaft is provided with a multiplicity of holes. An inert gas is supplied to the hollow shaft and directed from the rotating shaft to the holes in the auger. The inert gas flows down the hollow shaft, and then down the hollow auger and out through the holes in the bottom of the auger into the potentially hazardous area. 3 figs.

  14. Interaction between Drilled Shaft and Mechanically Stabilized Earth (MSE) Wall 

    E-Print Network [OSTI]

    Aghahadi Forooshani, Mohammad

    2014-08-28

    Drilled shafts under horizontal loads are being constructed within Mechanically Stabled Earth (MSE) walls in the reinforced zone especially in overpass bridges and traffic signs. The interaction between the drilled shafts and the MSE wall...

  15. Coiled tubing drilling requires economic and technical analyses

    SciTech Connect (OSTI)

    Gary, S.C. )

    1995-02-20

    Field experience has proven that coiled tubing drilling is a technical and economic option on some wells; however, coiled tubing drilling is not the solution to every drilling prospect or production-enhancement job. To determine if coiled tubing drilling is viable, the geographic, technical, and economic aspects of each project must be considered in detail. Generally, with some limitations, coiled tubing drilling is feasible primarily when jointed pipe cannot be used effectively. Also, coiled tubing drilling may be more appropriate because of some special well site requirements, such as environmental regulations requiring less surface disturbance. The paper discusses technical considerations which need to be considered, economic feasibility, limitations of well types (new shallow wells, conventional reentry, through-tubing reentry, and underbalanced drilling), and outlook for further growth in the coiled tubing drilling industry.

  16. Recent Drilling Activities At The Earth Power Resources Tuscarora...

    Open Energy Info (EERE)

    had severe hole-caving problems. The tight-hole drilling problems were reduced using drilling fluids consisting of Polymer-based mud mixed with 2% Potassium Chloride (KCl) to...

  17. INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization

    E-Print Network [OSTI]

    INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization JOI Alliance Joint Oceanographic Institutions, Inc. Executive Director, Ocean Drilling Programs Joint Oceanographic Institutions ........................................................................................................... 6 1.2.1. Lead Agency Guidance: Platform Operating Costs vs. Science Operating Costs.............. 6

  18. UNIVERSITY OF CALGARY Reduction of Wellbore Positional Uncertainty During Directional Drilling

    E-Print Network [OSTI]

    Calgary, University of

    UNIVERSITY OF CALGARY Reduction of Wellbore Positional Uncertainty During Directional Drilling the wellbore positional accuracy in directional drilling operations taken by Measurement While Drilling (MWD-survey correction for compensating drilling assembly magnetic interference to solve the problem of wellbore

  19. Deep drilling phase of the Pen Brand Fault Program

    SciTech Connect (OSTI)

    Stieve, A.

    1991-05-15

    This deep drilling activity is one element of the Pen Branch Fault Program at Savannah River Site (SRS). The effort will consist of three tasks: the extension of wells PBF-7 and PBF-8 into crystalline basement, geologic and drilling oversight during drilling operations, and the lithologic description and analysis of the recovered core. The drilling program addresses the association of the Pen Branch fault with order fault systems such as the fault that formed the Bunbarton basin in the Triassic.

  20. INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization

    E-Print Network [OSTI]

    1 INTEGRATED OCEAN DRILLING PROGRAM United States Implementing Organization JOI Alliance Joint ..................................................................................................................................21 Organizational Chart ...........................................................................................................30 Organizational Chart

  1. Applicability of petroleum horizontal drilling technology to hazardous waste site characterization and remediation

    SciTech Connect (OSTI)

    Goranson, C.

    1992-09-01

    Horizontal wells have the potential to become an important tool for use in characterization, remediation and monitoring operations at hazardous waste disposal, chemical manufacturing, refining and other sites where subsurface pollution may develop from operations or spills. Subsurface pollution of groundwater aquifers can occur at these sites by leakage of surface disposal ponds, surface storage tanks, underground storage tanks (UST), subsurface pipelines or leakage from surface operations. Characterization and remediation of aquifers at or near these sites requires drilling operations that are typically shallow, less than 500-feet in depth. Due to the shallow nature of polluted aquifers, waste site subsurface geologic formations frequently consist of unconsolidated materials. Fractured, jointed and/or layered high compressive strength formations or compacted caliche type formations can also be encountered. Some formations are unsaturated and have pore spaces that are only partially filled with water. Completely saturated underpressured aquifers may be encountered in areas where the static ground water levels are well below the ground surface. Each of these subsurface conditions can complicate the drilling and completion of wells needed for monitoring, characterization and remediation activities. This report describes some of the equipment that is available from petroleum drilling operations that has direct application to groundwater characterization and remediation activities. A brief discussion of petroleum directional and horizontal well drilling methodologies is given to allow the reader to gain an understanding of the equipment needed to drill and complete horizontal wells. Equipment used in river crossing drilling technology is also discussed. The final portion of this report is a description of the drilling equipment available and how it can be applied to groundwater characterization and remediation activities.

  2. Increased reserves through horizontal drilling in a mature waterflood, Long Beach unit, Wilmington Oil Field, California

    SciTech Connect (OSTI)

    Berman, B.H.

    1996-12-31

    Ranger Zone development started in 1965. A waterflood was initiated from the start using a staggered line-drive pattern. Infill drilling in the early 1980s and again in the 1990s revealed bypassed oil in the upper Ranger Fo sand. Detailed studies of the aerial extent of the remaining oil resulted in drilling 17 horizontal wells to recover these reserves. The Fo target sand thickness is 20 to 50 feet. Well courses are between 10 and 15 feet below the top of the Fo with lengths varying from 800 to 1,000 feet. The success of the Fo drilling program has prompted expansion of horizontal drilling into thin-bedded sand units. Well lengths have increased to between 1,500 and 1,800 feet with structural trend used to advantage. Where needed, probes are designed to penetrate the target sand before setting intermediate casing. The drilling program has been extended into bilateral horizontal completions. Geosteering with MWD/GR and a 2 MHz dual propagation resistivity tool is used to the casing point. In the completion interval, only the MWD/GR tool is used and a drillpipe conveyed E-log is run afterward to confirm expected resistivities. Despite the many well penetrations in the Ranger Zone, structural control is only fair. Accuracy of MWD data is generally low and geosteering is done by TVD log correlation. With a recovery factor of over 30 percent in Ranger West, from approximately 800 wells drilled in the last 30 years, the horizontal drilling program targeting bypassed reserves has brought new life to this mature reservoir.

  3. Increased reserves through horizontal drilling in a mature waterflood, Long Beach unit, Wilmington Oil Field, California

    SciTech Connect (OSTI)

    Berman, B.H. )

    1996-01-01

    Ranger Zone development started in 1965. A waterflood was initiated from the start using a staggered line-drive pattern. Infill drilling in the early 1980s and again in the 1990s revealed bypassed oil in the upper Ranger Fo sand. Detailed studies of the aerial extent of the remaining oil resulted in drilling 17 horizontal wells to recover these reserves. The Fo target sand thickness is 20 to 50 feet. Well courses are between 10 and 15 feet below the top of the Fo with lengths varying from 800 to 1,000 feet. The success of the Fo drilling program has prompted expansion of horizontal drilling into thin-bedded sand units. Well lengths have increased to between 1,500 and 1,800 feet with structural trend used to advantage. Where needed, probes are designed to penetrate the target sand before setting intermediate casing. The drilling program has been extended into bilateral horizontal completions. Geosteering with MWD/GR and a 2 MHz dual propagation resistivity tool is used to the casing point. In the completion interval, only the MWD/GR tool is used and a drillpipe conveyed E-log is run afterward to confirm expected resistivities. Despite the many well penetrations in the Ranger Zone, structural control is only fair. Accuracy of MWD data is generally low and geosteering is done by TVD log correlation. With a recovery factor of over 30 percent in Ranger West, from approximately 800 wells drilled in the last 30 years, the horizontal drilling program targeting bypassed reserves has brought new life to this mature reservoir.

  4. OCEAN DRILLING PROGRAM LEG 116 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche Forschungsgemeinschaft Environment Research Council (United Kingdom) European Science Foundation Consortium for the Ocean Drilling in the world, extending some 3000 km from the slope south of the Bengal delta to merge with the Sri Lanka

  5. OCEAN DRILLING PROGRAM LEG 181 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 181 SCIENTIFIC PROSPECTUS SOUTHWEST PACIFIC GATEWAYS Dr. Robert M acknowledgment of this source. Scientific Prospectus No. 81 First Printing 1998 Distribution Electronic copies of this publication may be obtained from the ODP Publications Home Page on the World Wide Web at http

  6. OCEAN DRILLING PROGRAM LEG 146 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    at two sites to determine its nature and whether free gas is present beneath it. At all drill site Program (Belgium, Denmark, Finland, Greece, Iceland, Italy, The Netherlands, Norway, Spain, Sweden Science Foundation (United States) Natural Environment Research Council (United Kingdom) Ocean Research

  7. Impedance-matched drilling telemetry system

    DOE Patents [OSTI]

    Normann, Randy A. (Edgewood, NM); Mansure, Arthur J. (Albuquerque, NM)

    2008-04-22

    A downhole telemetry system that uses inductance or capacitance as a mode through which signal is communicated across joints between assembled lengths of pipe wherein efficiency of signal propagation through a drill string, for example, over multiple successive pipe segments is enhanced through matching impedances associated with the various telemetry system components.

  8. OCEAN DRILLING PROGRAM LEG 120 PRELIMINARY REPORT

    E-Print Network [OSTI]

    with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche Forschungsgemeinschaft (Federal Republic of GermanyOCEAN DRILLING PROGRAM LEG 120 PRELIMINARY REPORT CENTRAL KERGUELEN PLATEAU Roland Schlich Co

  9. OCEAN DRILLING PROGRAM LEG 114 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    ., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgemeinschaftOCEAN DRILLING PROGRAM LEG 114 SCIENTIFIC PROSPECTUS SUBANTARCTIC SOUTH ATLANTIC Dr. John L. La

  10. OCEAN DRILLING PROGRAM LEG 101 PRELIMINARY REPORT

    E-Print Network [OSTI]

    Institutions, Inc., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgemeinschaftOCEAN DRILLING PROGRAM LEG 101 PRELIMINARY REPORT BAHAMAS James A. Austin, Jr. Co-Chief Scientist

  11. OCEAN DRILLING PROGRAM LEG 103 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche Forschungsgemeinschaft (Federal Republic of GermanyOCEAN DRILLING PROGRAM LEG 103 SCIENTIFIC PROSPECTUS GALICIA BANK Gilbert Boillot Edward L

  12. OCEAN DRILLING PROGRAM LEG 111 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    ., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgemeinschaftOCEAN DRILLING PROGRAM LEG 111 SCIENTIFIC PROSPECTUS DSDP HOLE 504B REVISITED Keir Becker

  13. OCEAN DRILLING PROGRAM LEG 102PRELIMINARY REPORT

    E-Print Network [OSTI]

    with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche Forschungsgemeinschaft (Federal Republic of GermanyOCEAN DRILLING PROGRAM LEG 102PRELIMINARY REPORT SITE 418A: DOWNHOLE MEASUREMENTS IN OLDOCEANIC

  14. OCEAN DRILLING PROGRAM LEG 103 PRELIMINARY REPORT

    E-Print Network [OSTI]

    Institutions, Inc., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgemeinschaftOCEAN DRILLING PROGRAM LEG 103 PRELIMINARY REPORT GALICIA MARGIN Gilbert Boillot Edward L. Winterer

  15. OCEAN DRILLING PROGRAM LEG 104 PRELIMINARY REPORT

    E-Print Network [OSTI]

    for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche, Ontario, Canada) Lysne, Peter (Sandia National Laboratory, Albuquerque, NM) McDonald, Thomas (Texas AOCEAN DRILLING PROGRAM LEG 104 PRELIMINARY REPORT NORWEGIAN SEA Olav Eldholm Co-Chief Scientist

  16. OCEAN DRILLING PROGRAM LEG 121 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Oceanographic Institutions, Inc., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) DeutscheOCEAN DRILLING PROGRAM LEG 121 SCIENTIFIC PROSPECTUS BROKEN RIDGE / NINETYEAST RIDGE Dr. John

  17. OCEAN DRILLING PROGRAM LEG 102 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Institutions, Inc., under contract with the National Science Foundation. Funding for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche ForschungsgeitieinschaftOCEAN DRILLING PROGRAM LEG 102 SCIENTIFIC PROSPECTUS DOWNHOLE MEASUREMENTS IN THE WESTERN ATLANTIC

  18. OCEAN DRILLING PROGRAM LEG 108 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    of Energy, Mines and Resources (Canada) Deutsche Forschungsgemeinschaft (Federal Republic of Germany Federal Republic of Germany Dr. Jack G. Baldauf Staff Scientist, Leg 108 Ocean Drilling Program Texas-water paleoceanography with those of the zonal and meridional paleo-wind circulation. OBJECTIVES The eleven oroposed

  19. Recovery Act Weekly Video: 200 West Drilling

    ScienceCinema (OSTI)

    None

    2012-06-14

    President of Cascade Drilling, Bruce, talks about his contract with the Department of Energy and what his team is doing to improve water treatment and environmental cleanup. The small business owner hits on how the Recovery Act saved him from downsizing and helped him stay competitive and safe on site.

  20. OCEAN DRILLING PROGRAM LEG 177 PRELIMINARY REPORT

    E-Print Network [OSTI]

    Bremerhaven Germany Dr. David Hodell Co-Chief Scientist Department of Geology University of Florida 1112/Canada/Chinese Taipei/Korea Consortium for Ocean Drilling Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, The Netherlands, Norway, Portugal, Spain, Sweden, Switzerland, and Turkey) People

  1. OCEAN DRILLING PROGRAM LEG 157 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Vulkanologie und Pétrologie GEOMAR Research Center Wischhofstrasse 1-3 D-24148 Kiel Federal Republic of Germany/Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, Greece, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any

  2. OCEAN DRILLING PROGRAM LEG 154 PRELIMINARY REPORT

    E-Print Network [OSTI]

    /Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Greece, Iceland, Italy, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any, Federal Republic of Germany) William P. Chaisson (290 Laburnam Crescent, Rochester, New York 14620, U

  3. OCEAN DRILLING PROGRAM LEG 151 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    GEOMAR Wischhofstrasse 1-3, Gebàude 4 D-2300 Kiel 14 Federal Republic of Germany Dr. John Firth Staff/Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, Greece, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any

  4. OCEAN DRILLING PROGRAM LEG 162 PRELIMINARY REPORT

    E-Print Network [OSTI]

    /Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Greece, Iceland, Italy, the Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any, Germany; E-mail: khb@mail.sedpal.uni-bremen.de) Viviane Bout-Roumazeilles, Sedimentologist (Laboratoire de

  5. OCEAN DRILLING PROGRAM LEG 144 PRELIMINARY REPORT

    E-Print Network [OSTI]

    /Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, Greece, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any Università^ Kiel, D-2300 Kiel-14, Germany) Bj0rn Buchardt (Department of Geology, University of Copenhagen, 0

  6. OCEAN DRILLING PROGRAM LEG 157 PRELIMINARY REPORT

    E-Print Network [OSTI]

    Republic of Germany United Kingdom Dr. John Firth Staff Scientist, Leg 157 Ocean Drilling Program Texas A Forschungsgemeinschaft (Federal Republic of Germany) Institut Francais de Recherche pour 1'Exploitation de la Mer (France, Switzerland, and Turkey) Any opinions, findings and conclusions or recommendations expressed

  7. OCEAN DRILLING PROGRAM LEG 161 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    D-24148 Kiel 18002 Granada Federal Republic of Germany Spain Dr. Adam Klaus Staff Scientist, Leg 161/Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, Greece, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any

  8. OCEAN DRILLING PROGRAM LEG 141 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    345 Middlefield Road Federal Republic of Germany Menlo Park, California 94025 Dr. Robert Musgrave Forschungsgemeinschaft (Federal Republic of Germany) European Science Foundation Consortium for the Ocean Drilling, Switzerland, and Turkey) Institut Français de Recherche pour TExploitation de la Mer (France) National Science

  9. OCEAN DRILLING PROGRAM LEG 175 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    Universität Bremen Postfach 33 04 40 D-28334 Bremen Germany Dr. Carl Richter Staff Scientist, Leg 175 Ocean Drilling Deutsche Forschungsgemeinschaft (Federal Republic of Germany) Institut Français de Recherche pour, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any opinions, findings, and conclusions

  10. OCEAN DRILLING PROGRAM LEG 122 PRELIMINARY REPORT

    E-Print Network [OSTI]

    Federal Republic of Germany Dr. Suzanne O Connell Staff Scientist, Leg 122 Ocean Drilling Program Texas A (Federal Republic of Germany) Institut Francais de Recherche pour 1'Exploitation de la Mer (France) Ocean, Switzerland, and Turkey) Any opinions, findings and conclusions or recommendations expressed

  11. OCEAN DRILLING PROGRAM LEG 151 PRELIMINARY REPORT

    E-Print Network [OSTI]

    GEOMAR N-0316, Oslo 3 Wischhofstrasse 1-3, Gebáude 4 Norway D-24148 Kiel 14 Federal Republic of Germany/Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Greece, Iceland, Italy, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any

  12. OCEAN DRILLING PROGRAM LEG 138 PRELIMINARY REPORT

    E-Print Network [OSTI]

    for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany) European Science, the Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Institut Français de Recherche pour 1-2300 Kiel, Federal Republic of Germany) John Farrell (Department of Geological Sciences, Brown

  13. OCEAN DRILLING PROGRAM LEG 166 PRELIMINARY REPORT

    E-Print Network [OSTI]

    /Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any opinions of Germany, E-mail: betzler@em.uni-frankfurt.d400.de) Beth A. Christensen, Stratigraphic Correlator, (Dept

  14. OCEAN DRILLING PROGRAM LEG 133 PRELIMINARY REPORT

    E-Print Network [OSTI]

    /Australia Consortium for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, Greece, the Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any für Geologie und Palàontologie, Sigwarstr. 10, D-7400 Tubingen, Federal Republic of Germany) Thomas C

  15. OCEAN DRILLING PROGRAM LEG 160 SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    of Germany Dr. Alastair Robertson Co-Chief Scientist, Leg 160 Grant Institute of Geology University for the Ocean Drilling Program Deutsche Forschungsgemeinschaft (Federal Republic of Germany) Institut Français, Iceland, Italy, Greece, The Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any opinions

  16. OCEAN DRILLING PROGRAM LEG 131 PRELIMINARY REPORT

    E-Print Network [OSTI]

    /Australia Consortium for the Ocean DrillingProgram Deutsche Forschungsgemeinschaft (Federal Republic of Germany, Finland, Iceland, Italy, Greece, the Netherlands, Norway, Spain, Sweden, Switzerland, and Turkey) Any, Stilleweg 2, D- 3000 Hannover 51, Federal Republic of Germany) Warner Brückmann (GEOMAR-Center for Marine

  17. OCEAN DRILLING PROGRAM LEG 108 PRELIMINARY REPORT

    E-Print Network [OSTI]

    of Energy, Mines and Resources (Canada) Deutsche Forschungsgemeinschaft (Federal Republic of Germany Federal Republic of Germany Jack G. Baldauf Staff Scientist, Leg 108 Ocean Drilling Program Texas A fi M-Chief Scientist (Geologisch- Palaeontologisches Institut, Universitaet Kiel, Kiel, Federal Republic of Germany

  18. OCEAN DRILLING PROGRAM LEG 171A SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    DRILLING (LWD) Dr. J. Casey Moore Co-Chief Scientist, Leg 171A University of California, Santa Cruz Earth and fluid flow. Logging-while-drilling (LWD) provides an industry-standard tool for in situ evaluation of physical processes, including transient borehole conditions. Leg 171B will drill a series of LWD holes

  19. Drill Press Speed Chart Recommended operating speeds (RPM)

    E-Print Network [OSTI]

    Quigg, Chris

    Drill Press Speed Chart Recommended operating speeds (RPM) Accessory Softwood (Pine) Hardwood (Hard Maple) Acrylic Brass Aluminum Steel Shop Notes Twist drill bits 1/16" - 3/16" 1/4" - 3/8" 7/16"- 5/8" 11 1000 600 350 Lubricate drill with oil when cutting steel 1/8" or thicker. Use center punch on all holes

  20. CRITICAL REVIEW OF BIOLOGY AND CONTROL OF OYSTER DRILLS

    E-Print Network [OSTI]

    CRITICAL REVIEW OF BIOLOGY AND CONTROL OF OYSTER DRILLS Urosalpinx and Eupleura Marine Biological L, Farley, Director Critical Review of Biology and Control of Oyster Drills UROSALPINX and EUPLEURA 17 General 17 Nervous System 20 Circulatory System 20 Locomotory System 21 Drilling and Feeding

  1. Integrated Ocean Drilling Program U.S. Implementing Organization

    E-Print Network [OSTI]

    Integrated Ocean Drilling Program U.S. Implementing Organization FY11 Annual Report #12;Sunset aboard the JOIDES Resolution #12;The Integrated Ocean Drilling Program (IODP) is an international marine as recorded in seafloor sediments and rocks. IODP builds upon the earlier successes of the Deep Sea Drilling

  2. OCEAN DRILLING PROGRAM LEG 142 ENGINEERING AND SCIENTIFIC PROSPECTUS

    E-Print Network [OSTI]

    OCEAN DRILLING PROGRAM LEG 142 ENGINEERING AND SCIENTIFIC PROSPECTUS EAST PACIFIC RISE Mr. Michael A. Storms Operations Superintendent/ Assistant Manager of Engineering and Drilling Operations Ocean Drilling Program Texas A&M University Research Park 1000 Discovery Drive College Station, Texas 77845

  3. Examples, demos, drills, projects Getting it to happen

    E-Print Network [OSTI]

    Gelman, Andrew

    Examples, demos, drills, projects Getting it to happen Challenges and struggles Teaching Statistics University 3 June 2005 Andrew Gelman Teaching Statistics: A Bag of Tricks #12;Examples, demos, drills #12;Examples, demos, drills, projects Getting it to happen Challenges and struggles Themes Active

  4. Representation of Terrain Data Using a Mathematical "Drill" Operator

    E-Print Network [OSTI]

    Franklin, W. Randolph

    Representation of Terrain Data Using a Mathematical "Drill" Operator Christopher S. Stuetzle1 and W and Franklin (RPI) Autocarto 2012 17 Sep 2012 6 / 24 #12;The Drill Operator v Then cut along an ever deeper Creates hydrography. 1 How can we fit a drill to a terrain location (pixel) p? 2 How can we represent

  5. KNOWLEDGE-BASED DECISION SUPPORT IN OIL WELL DRILLING

    E-Print Network [OSTI]

    Aamodt, Agnar

    KNOWLEDGE-BASED DECISION SUPPORT IN OIL WELL DRILLING Combining general and case-specific knowledge of Computer and Information Science. agnar.aamodt@idi.ntnu.no Abstract: Oil well drilling is a complex process for information handling, decision-making, and on-the-job learning for drilling personnel in their daily working

  6. INTEGRATED OCEAN DRILLING PROGRAM U.S. IMPLEMENTING ORGANIZATION

    E-Print Network [OSTI]

    INTEGRATED OCEAN DRILLING PROGRAM U.S. IMPLEMENTING ORGANIZATION FISCAL YEAR 2008 ANNUAL REPORT #12;#12;INTEGRATED OCEAN DRILLING PROGRAM UNITED STATES IMPLEMENTING ORGANIZATION CONSORTIUM FOR OCEAN LEADERSHIP FOUNDATION CONTRACT OCE-0352500 1 OCTOBER 2007­30 SEPTEMBER 2008 #12;INTEGRATED OCEAN DRILLING PROGRAM ii

  7. Integrated Ocean Drilling Program U.S. Implementing Organization

    E-Print Network [OSTI]

    Integrated Ocean Drilling Program U.S. Implementing Organization FY12 Annual Report #12;Handling downhole tool string #12;The Integrated Ocean Drilling Program (IODP) is an international marine research in seafloor sediments and rocks. IODP builds upon the earlier successes of the Deep Sea Drilling Project (DSDP

  8. Waste Management of Cuttings, Drilling Fluids, Flowback and Produced Water

    E-Print Network [OSTI]

    Walter, M.Todd

    Waste Management of Cuttings, Drilling Fluids, Flowback and Produced Water the drill bit as it cuts deeper into the earth. This fluid, which is used only of the shale. Drilling muds are made up of a base fluid (water, mineral oil

  9. CARD No. 33 Consideration of Drilling Events in Performance Assessments

    E-Print Network [OSTI]

    CARD No. 33 Consideration of Drilling Events in Performance Assessments 33.A.1 BACKGROUND have an effect on the disposal system (61 FR 5228). Section 194.33, "Consideration of drilling events in performance assessments," sets forth specific requirements for incorporation of human-initiated drilling

  10. Workshop Reports Scientific Drilling and Related Research in the Samail

    E-Print Network [OSTI]

    Manning, Craig

    Workshop Reports Scientific Drilling and Related Research in the Samail Ophiolite, Sultanate.2204/iodp.sd.15.10.2013 64 Scientific Drilling, No. 15, March 2013 Workshop Reports Summary This workshop report describes plans for scientific drill- ing in the Samail ophiolite in Oman in the context of past

  11. Environmental Conditions for Ocean Drilling Program Operations in

    E-Print Network [OSTI]

    Environmental Conditions for Ocean Drilling Program Operations in the Weddell Sea and Sub Library. #12;ENVIRONMENTAL CONDITIONS FOR OCEAN DRILLING PROGRAM LEG 113 (WEDDELL SEA) AND LEG 114 (SUBANTARCTIC SOUTH ATLANTIC) PROPOSED DRILLING SCHEDULE: JANUARY-APRIL, 1987 MAY 30, 1986 HAN CHOI AMANDA

  12. Surface control bent sub for directional drilling of petroleum wells

    DOE Patents [OSTI]

    Russell, Larry R. (6025 Edgemoor, Suite C, Houston, TX 77081)

    1986-01-01

    Directional drilling apparatus for incorporation in a drill string, wherein a lower apparatus section is angularly deviated from vertical by cam action and wherein rotational displacement of the angularly deviated apparatus section is overcome by additional cam action, the apparatus being operated by successive increases and decreases of internal drill string pressure.

  13. A simple model for laser drilling Jeb Collins a,1

    E-Print Network [OSTI]

    A simple model for laser drilling Jeb Collins a,1 , Pierre Gremaud b,2, aDepartment of Mathematics drilling is proposed. Assuming axi-symmetry of the process around the axis of the laser beam, a one, implemented and validated for drilling using lasers with intensities in the GW/cm2 range and microsecond

  14. Penetration rate prediction for percussive drilling via dry friction model

    E-Print Network [OSTI]

    Krivtsov, Anton M.

    Penetration rate prediction for percussive drilling via dry friction model Anton M. Krivtsov a of percussive drilling assuming a dry friction mechanism to explain the experimentally observed drop in pene in drilling research is a fall of pene- tration rate for higher static loads. This is known both

  15. WATERJET ASSISTED POLYCRYSTALLINE DIAMOND INDENTATION DRILLING OF ROCK

    E-Print Network [OSTI]

    improved drilling rates can provide a significant benefit, justifying the costs and effort required both of drilling and completions of the wells can account for 25 ­ 50% of the cost of the electricity whichWATERJET ASSISTED POLYCRYSTALLINE DIAMOND INDENTATION DRILLING OF ROCK Santi, P, Bell, S

  16. JOIDES Resolution Drill Ship Drill into Indian Ridge MOHO Hole Cleaning Study 

    E-Print Network [OSTI]

    Lindanger, Catharina

    2014-05-03

    to the drilling fluid system. These limitations need to be understood and their effect on the operation addressed prior to the beginning operations. The object of this study is to determine if the limitations, such as pumping and storage capabilities...

  17. Neutron and X-ray Scattering Techniques have proved so successful in condensed matter studies that a wide variety of sample environments have been developed in consquence. Many

    E-Print Network [OSTI]

    Boyer, Edmond

    Foreword Neutron and X-ray Scattering Techniques have proved so successful in condensed matter whose function is to develop and optimise the techniques appropriate to neutron scattering. Since other neutron and X-ray research centres have similar technical support groups, it was felt timely to unité

  18. Theme Issue "Trends in Formal Description Techniques" In the 80s, we witnessed the development and international standardization of the Formal

    E-Print Network [OSTI]

    Bredereke, Jan - Fachbereich 3

    Page 1 Theme Issue "Trends in Formal Description Techniques" Editorial In the 80s, we witnessed the development and international standardization of the Formal Description Techniques (FDTs) Estelle, LOTOS underwent substantial extensions, while the Estelle and LOTOS standards remained relatively stable

  19. Coiled tubing drilling: Real time MWD with dedicated powers to the BHA

    SciTech Connect (OSTI)

    Leismer, D.; Williams, B.; Pursell, J.

    1996-12-31

    This paper describes and analyzes the development and ongoing field trials of a Real Time MWD Coiled Tubing Drilling System. The new system holds great promise for advancing the state of coiled tubing drilling for certain applications. The system is designed for through-tubing, short radius re-entry and drilling highly deviated wells as horizontal laterals to a geologic target with minimum wellbore tortuosity. Currently, 4-1/2-in production tubing is the smallest re-entry candidate. Real time MWD and Bottom Hole Assembly (BHA) control is achieved by the use of a combination hydraulic and electric umbilical internal to the coiled tubing (CT), allowing continuous data collection and selective surface control of the BHA components. This communication line allows orientation in 10{degree} increments (or less) while drilling, applies weight-on-bit and operates a reusable circulating valve. In addition, the umbilical provides real-time monitoring of weight-on-bit, circulating pressures of the drilling fluid internal and external to the BHA, dedicated hydraulic system bottom hole pressure, downhole temperature and survey data from logging equipment.

  20. Development of a cell culture surface conversion technique using alginate thin film for evaluating effect upon cellular differentiation

    SciTech Connect (OSTI)

    Nakashima, Y.; Tsusu, K.; Minami, K.; Nakanishi, Y.

    2014-06-15

    Here, we sought to develop a cell culture surface conversion technique that would not damage living cells. An alginate thin film, formed on a glass plate by spin coating of sodium alginate solution and dipping into calcium chloride solution, was used to inhibit adhesion of cells. The film could be removed by ethylenediaminetetraacetate (EDTA) at any time during cell culture, permitting observation of cellular responses to conversion of the culture surface in real time. Additionally, we demonstrated the validity of the alginate thin film coating method and the performance of the film. The thickness of the alginate thin film was controlled by varying the rotation speed during spin coating. Moreover, the alginate thin film completely inhibited the adhesion of cultured cells to the culture surface, irrespective of the thickness of the film. When the alginate thin film was removed from the culture surface by EDTA, the cultured cells adhered to the culture surface, and their morphology changed. Finally, we achieved effective differentiation of C2C12 myoblasts into myotube cells by cell culture on the convertible culture surface, demonstrating the utility of our novel technique.

  1. Drilling Optimization Utilizing Surface Instrumentaton for Downhole Event Recognition

    SciTech Connect (OSTI)

    John H. Cohen; Greg Deskins

    2006-02-01

    This DOE project was undertaken to develop and test an instrumented data-acquisition sub that is mounted in a drill string below the top drive and used to detect downhole events. Data recorded at the surface during drilling operations would then be processed and presented to the driller to discern undesirable drilling conditions and help optimize drilling rates and maximize the life of components in the BHA. This instrumented sub was originally conceived and developed solely as a single-point collection center for rig data that would be used in a number of Noble's products. The sub was designed to collect hook load, rotary torque, rotary speed, rotary position, drill pipe pressure, mud temperature, triaxial vibration, and triaxial magnetometer data. The original design and fabrication was by Sandia National Labs under Noble's direction, which was then tested with Sandia's diagnostics-while-drilling downhole package. After initial results were analyzed, the team surmised that important information describing performance and condition of the bottom-hole assembly (BHA) was embedded in the data recorded by the instrumented sub, and began investigating the potential of using surface measurements from the sub to highlight problems occurring downhole before they could be discerned by the driller. Later, a proposal was submitted to DOE for funding to more broadly investigate use of the system for detecting downhole problems while drilling. Soon after DOE awarded this contract, the Noble team responsible for the previous developments was disbanded and their work terminated (due to factors unrelated to the sub development). This change halted the complementary work that Noble had planned to conduct during the DOE project, and necessitated that all the development work be completed by the DOE project. More effort was expended on the project to develop a field-ready prototype than was originally foreseen. The sub's design had to be significantly modified during the project based on results of field tests. The original slip ring for communication was replaced with a radio link, which makes the sub easier to move to different rigs and simplifies the set-up process. In addition, the sub's previous design would prevent it being used on oil and gas rigs due to potential explosion hazard. The sub was redesigned so that during operation all electrical components on the sub are under a blanket of nitrogen. A pressure switch is used so that, should a leak develop, the sub will shut itself down until any problems are repaired. A total of four series of field tests were conducted. The first (mentioned above) was part of the original Noble-sponsored program and in conjunction with Sandia's diagnostics-while-drilling system. Although these tests highlighted important problems, they showed significant promise for the concept, and the sub was returned to Sandia for early repairs and modifications. After the DOE project took possession of the sub, it was tested three more times in the field. The first two DOE tests had the same objective, which was to establish that the sub could function correctly on the rig and deliver usable data, and to develop procedures for setting up and operating the sub and support computer on a rig. During the first test most of the time was spent troubleshooting the sub. Several significant problems were revealed, demonstrating that the current design was not robust enough to survive typical oil field operations. The sub was then redesigned to increase its robustness and allow it to run safely in areas where explosive gases might be present. Once these changes were implemented, the sub was sent to a second shake-down field test. The new design was found to be greatly improved. The sub operated throughout the test, and quality of the data was significantly higher. Near the end of this project, a final field test was conducted with the objective of creating (or simulating) specific problem conditions and recording data to determine if signatures could be recorded and identified that, after analysis, might signify particula

  2. M.S. ABDULLAH, I. BENEST, A. EVANS, and C. KIMBLE, Knowledge Modelling Techniques For Developing Knowledge Management Systems, 3rd European Conference on

    E-Print Network [OSTI]

    Kimble, Chris

    modelling, knowledge management, knowledge management system, knowledge, knowledge engineering. 1M.S. ABDULLAH, I. BENEST, A. EVANS, and C. KIMBLE, Knowledge Modelling Techniques For Developing Knowledge Management Systems, 3rd European Conference on Knowledge Management, Dublin, Ireland, September

  3. Evaluation of high-pressure drilling fluid supply systems

    SciTech Connect (OSTI)

    McDonald, M.C.; Reichman, J.M.; Theimer, K.J.

    1981-10-01

    A study was undertaken to help determine the technical and economic feasibility of developing a high-pressure fluid-jet drilling system for the production of geothermal wells. Three system concepts were developed and analyzed in terms of costs, component availability, and required new-component development. These concepts included a single-conduit system that supplies the downhole cutting nozzles directly via surface-located high-pressure pumps; a single-conduit system utilizing low-pressure surface pumps to supply and operate a high-pressure downhole pump, which in turn supplies the cutting nozzles; and a dual-conduit system supplying surface-generated high-pressure fluid for cutting via one conduit and low-pressure scavenging fluid via the other. It is concluded that the single-conduit downhole pump system concept has the greatest potential for success in this application. 28 figures, 11 tables.

  4. Ultratough, Thermally Stable Polycrystalline Diamond/Silicon Carbide Nanocomposites for Drill Bits

    SciTech Connect (OSTI)

    2009-03-01

    This factsheet describes a research project whose goal is to develop and produce in quantity novel superhard and ultratough thermally stable polycrystalline (TSP) diamond/SiC nanocomposites reinforced with SiC/C nanofibers for drill-bit applications and multiple industrial functions.

  5. Removal of Filter Cake Generated by Manganese Tetraoxide Water-based Drilling Fluids 

    E-Print Network [OSTI]

    Al Mojil, Abdullah Mohammed A.

    2011-10-21

    Three effective solutions to dissolve the filter cake created by water-based drilling fluids weighted with Mn3O4 particles were developed. Hydrochloric acid at concentration lower than 5 wt% can dissolve most of Mn3O4-based filter cake. Dissolving...

  6. Temporary Bridging Agents for Use in Drilling and Completions of EGS

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Develop materials or systems that bridge to seal or divert flow from fractures existing while drilling EGS wells or in injection formation and that eventually decompose thereby leaving the fractures unsealed and undamaged.

  7. Development of quality control procedures for mass produced and released Bactrocera Philippinensis (Diptera: Tephritidae) for sterile insect technique programs

    SciTech Connect (OSTI)

    Resilva, S.; Obra, G.; Zamora, N.; Gaitan, E.

    2007-03-15

    Quality control procedures for Bactrocera philippinensis Drew and Hancock 1994 (Diptera: Tephritidae) used in sterile insect technique (SIT) programs were established in the mass rearing facility at the Philippine Nuclear Research Institute. Basic studies on pupal irradiation, holding/packaging systems, shipping procedures, longevity, sterility studies, and pupal eye color determination in relation to physiological development at different temperature regimes were investigated. These studies will provide baseline data for the development of quality control protocols for an expansion of B. philippinensis field programs with an SIT component in the future. (author) [Spanish] Los procedimientos de control de calidad para Bactrocera philippinensis Drew y Hancock 1994 (Diptera: Tephritidae) usados en programas de la tecnica de insecto esteril (TIE) fueron establecidos en la facilidad de cria en masa del Instituto Filipino de Investigacion Nuclear. Estudios basicos sobre la irradiacion de las pupas, sistemas de almacenaje/empaque, procedimientos del envio, longevidad, estudios de esterilidad y la determinacion del color de ojo de la pupa en relacion con el desarrollo fisiologico en regimenes diferentes de temperatura fueron investigados. Estos estudios proveeran una linea de informacion basica para el desarrollo de protocolos de control de calidad para una expansion de los programas de campo para B. philippinensis con un componente de TIS en el futuro. (author)

  8. Horizontal drilling in shallow, geologically complex reservoirs

    SciTech Connect (OSTI)

    Venable, S.D.

    1992-10-01

    The objective of this project is to test the concept that multiple hydraulic fracturing from a directionally-drilled horizontal well, using the medium radius build rate method, can increase gas production sufficiently to justify economic viability over conventional stimulated vertical wells. The test well is located in Yuma County, Colorado, in a favorable area of established production to avoid exploration risks. This report presents: background information; project description which covers location selection/geologic considerations; and preliminary work plan. (AT)

  9. Horizontal drilling in shallow, geologically complex reservoirs

    SciTech Connect (OSTI)

    Venable, S.D.

    1992-01-01

    The objective of this project is to test the concept that multiple hydraulic fracturing from a directionally-drilled horizontal well, using the medium radius build rate method, can increase gas production sufficiently to justify economic viability over conventional stimulated vertical wells. The test well is located in Yuma County, Colorado, in a favorable area of established production to avoid exploration risks. This report presents: background information; project description which covers location selection/geologic considerations; and preliminary work plan. (AT)

  10. Drills and Classes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center HomeVehicleDepartment ofGraphics » DocumentsDrills and Classes

  11. Application of coiled-tubing-drilling technology on a deep underpressured gas reservoir

    SciTech Connect (OSTI)

    1997-06-01

    The Upper-Mississippian Elkton formation is a dolomitized shallow-water carbonate consisting of dense limestones and porous dolomites. The Elkton was deposited in an open-shelf environment as crinoid grainstones, coral packstones, and lime muds. Deposition of impermeable shales and siltstones of the Lower Cretaceous created the lateral and updip seals. Reservoir thickness can be up to 20 m, with porosities reaching 20% and averaging 10%. The reservoir gas contains approximately 0.5% hydrogen sulfide. Well 11-18 was to be completed in the Harmatten Elkton pool. The pool went on production in 1967 at an initial pressure of 23,500 kPa. At the current pressure of 16,800 kPa, the remaining reserves are underpressured at 6.5 kPa/m, and underbalanced horizontal drilling was selected as the most suitable technique for exploiting remaining reserves. Coiled-tubing (CT) technology was selected to ensure continuous underbalanced conditions and maintain proper well control while drilling. The paper describes the equipment, CT drilling summary, and drilling issues.

  12. Deep Geothermal Drilling Using Millimeter Wave Technology. Final Technical Research Report

    SciTech Connect (OSTI)

    Oglesby, Kenneth; Woskov, Paul; Einstein, Herbert; Livesay, Bill

    2014-12-30

    Conventional drilling methods are very mature, but still have difficulty drilling through very deep,very hard and hot rocks for geothermal, nuclear waste entombment and oil and gas applications.This project demonstrated the capabilities of utilizing only high energy beams to drill such rocks,commonly called ‘Direct Energy Drilling’, which has been the dream of industry since the invention of the laser in the 1960s. A new region of the electromagnetic spectrum, millimeter wave (MMW) wavelengths at 30-300 giga-hertz (GHz) frequency was used to accomplish this feat. To demonstrate MMW beam drilling capabilities a lab bench waveguide delivery, monitoring and instrument system was designed, built and tested around an existing (but non-optimal) 28 GHz frequency, 10 kilowatt (kW) gyrotron. Low waveguide efficiency, plasma generation and reflected power challenges were overcome. Real-time monitoring of the drilling process was also demonstrated. Then the technical capability of using only high power intense millimeter waves to melt (with some vaporization) four different rock types (granite, basalt, sandstone, limestone) was demonstrated through 36 bench tests. Full bore drilling up to 2” diameter (size limited by the available MMW power) was demonstrated through granite and basalt samples. The project also demonstrated that MMW beam transmission losses through high temperature (260°C, 500oF), high pressure (34.5 MPa, 5000 psi) nitrogen gas was below the error range of the meter long path length test equipment and instruments utilized. To refine those transmission losses closer, to allow extrapolation to very great distances, will require a new test cell design and higher sensitivity instruments. All rock samples subjected to high peak temperature by MMW beams developed fractures due to thermal stresses, although the peak temperature was thermodynamically limited by radiative losses. Therefore, this limited drill rate and rock strength data were not able to be determined experimentally. New methods to encapsulate larger rock specimens must be developed and higher power intensities are needed to overcome these limitations. It was demonstrated that rock properties are affected (weakening then strengthened) by exposure to high temperatures. Since only MMW beams can economically reach rock temperatures of over 1650°C, even exceeding 3000°C, that can cause low viscosity melts or vaporization of rocks. Future encapsulated rock specimens must provide sufficiently large sizes of thermally impacted material to provide for the necessary rock strength, permeability and other analyzes required. Multiple MMW field systems, tools and methods for drilling and lining were identified. It was concluded that forcing a managed over-pressure drilling operation would overcome water influx and hot rock particulates handling problems, while simultaneously forming the conditions necessary to create a strong, sealing rock melt liner. Materials that contact hot rock surfaces were identified for further study. High power windows and gases for beam transmission under high pressures are critical paths for some of the MMW drilling systems. Straightness/ alignment can be a great benefit or a problem, especially if a MMW beam is transmitted through an existing, conventionally drilled bore.

  13. SHELTER-IN-PLACE DRILL DURING THE SHELTER-IN-PLACE DRILL BETWEEN 2:30pm AND 2:45pm, READ & DISCUSS THIS DOCU-

    E-Print Network [OSTI]

    Sorin, Eric J.

    SHELTER-IN-PLACE DRILL DURING THE SHELTER-IN-PLACE DRILL BETWEEN 2:30pm AND 2:45pm, READ & DISCUSS of Drill THIS DRILL IS A DISCUSSION BASED DRILL ONLY. At approximatley 2:30pm a BeachALERT Emergency Notification Message will go out to announce the drill. At 2:30pm there will be 15 minutes to go over

  14. Proper bit selection improves ROP in coiled tubing drilling

    SciTech Connect (OSTI)

    King, W.W. )

    1994-04-18

    Using the correct type of bit can improve the rate of penetration (ROP) and therefore the economics of coiled tubing drilling operations. Key factors, based on studies of the coiled tubing jobs to date, are that the drilling system must be analyzed as a whole system and that both the drill bit type and the formation compressive strength are critical components in this analysis. Once a candidate job has been qualified technically for drilling with coiled tubing, the job will have to be justified economically compared to conventional drilling. A key part of the economic analysis is predicting the ROP in each formation to be drilled to establish a drilling time curve. This prediction should be based on the key components of the system, including the following: hydraulics, motor capabilities, weight on bit (WOB), rock compressive strength, and bit type. This analysis should not base expected ROPs and offset wells drilled with conventional rigs and equipment. Furthermore, a small-diameter bit should not be selected simply by using the International Association of Drilling Contractor (IADC) codes of large-diameter bits used in offset wells. Coiled tubing drilling is described, then key factors in the selection are discussed.

  15. Development of radiohalogenated muscarinic ligands for the in vivo imaging of m-AChR by nuclear medicine techniques

    SciTech Connect (OSTI)

    McPherson, D.W.; Luo, H.; Knapp, F.F. Jr.

    1994-06-01

    Alterations in the density of acetylcholinergic muscarinic receptors (m-AChR) have been observed in various dementias. This has spurred interest in the development of radiohalogenated ligands which can be used for the non-invasive in vivo detection of m-AChR by nuclear medicine techniques. We have developed a new ligand 1-azabicyclo[2.2.2]oct-3-yl ({alpha}-hydroxy-{alpha}-(1-iodo-1-propen-3-yl)-{alpha}-phenylacetate (IQNP,12) which demonstrates high affinity for the muscarinic receptor. When labeled with radioiodine it has been shown to be selective and specific for m-ACHR. Initial studies on the separation and in vivo evaluation of the various isomers of IQNP have shown that the stereochemistry of the chiral centers and the configuration around the double bond play an important role in m-AChR subtype specificity. In vivo evaluation of these stereoisomers demonstrate that E-(R,R)-IQNP has a high affinity for the M{sub 1} muscarinic subtype while Z-(R,R)-IQNP demonstrate a high affinity for M{sub 1} and M{sub 2} receptor subtypes. These data demonstrate IQNP (12) has potential for use in the non-evasive in vivo detection of m-AChR by single photon emission computed tomography (SPECT). A brominated analogue, ``BrQNP,`` in which the iodine has been replaced by a bromine atom, has also been prepared and was shown to block the in vivo uptake of IQNP in the brain and heart and therefore has potential for positron emission tomographic (PET) studies of m-AChR.

  16. Initial results from an acoustic logging-while-drilling tool

    SciTech Connect (OSTI)

    Minear, J.W.; Heysse, D.R.; Boonen, P.M.

    1996-12-31

    This paper presents the initial results from field tests of an acoustic logging-while-drilling tool. Over 60,000 ft of well have been logged with 6.75-in.- and 8-in.-diameter versions of the tool. Various types of formations were encountered with compressional slowness values ranging from 55 {mu}sec/ft to 170 {mu}sec/ft. The tool is configured as a borehole-compensated device; transmitters are located on opposite sides of an array of four receivers. An ultrasonic standoff transducer provides a tool-to-borehole wall distance measurement for data quality evaluation and processing. Slowness values are computed downhole using real-time waveform processing. Full-waveform data are stored for retrieval and re-processing at the surface. Interactive processing software allows an engineer to reprocess log intervals of poorer log quality and improve the slowness log computed downhole. Downhole-processed and post-drilling-processed slowness logs are compared, and generally show close agreement. These logs also agree well with wireline slowness logs. Rugose boreholes and attenuating formations can reduce waveform quality. A new rapid-fire technique acquires multiple estimates of slowness as the drillstring rotates through only a fraction of a revolution, and improves slowness quality in rugose boreholes. Shear-wave energy is clearly apparent in most waveform data. Waveforms can be processed to yield both shear and compressional slowness values. These can then be used to estimate porosity, compute elastic moduli of the rock (for example, Poisson`s ratio, Young`s modulus, bulk compressibility, and shear modulus), and to compute synthetic seismograms for correlation with seismic profiles. Some of these applications of compressional and shear slowness data are discussed with examples.

  17. Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

    SciTech Connect (OSTI)

    Steve McRae; Thomas Walsh; Michael Dunn; Michael Cook

    2010-02-22

    In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrow Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.

  18. Assessing the nonlinear response of fine particles to precursor emissions: Development and application of an extended response surface modeling technique v1.0

    SciTech Connect (OSTI)

    Zhao, B.; Wang, S. X.; Xing, J.; Fu, K.; Fu, J. S.; Jang, C.; Zhu, Y.; Dong, X. Y.; Gao, Y.; Wu, W. J.; Wang, J. D.; Hao, J. M.

    2015-01-30

    An innovative extended response surface modeling technique (ERSM v1.0) is developed to characterize the nonlinear response of fine particles (PM???) to large and simultaneous changes of multiple precursor emissions from multiple regions and sectors. The ERSM technique is developed based on the conventional response surface modeling (RSM) technique; it first quantifies the relationship between PM??? concentrations and the emissions of gaseous precursors from each single region using the conventional RSM technique, and then assesses the effects of inter-regional transport of PM??? and its gaseous precursors on PM??? concentrations in the target region. We apply this novel technique with a widely used regional chemical transport model (CTM) over the Yangtze River delta (YRD) region of China, and evaluate the response of PM??? and its inorganic components to the emissions of 36 pollutant–region–sector combinations. The predicted PM??? concentrations agree well with independent CTM simulations; the correlation coefficients are larger than 0.98 and 0.99, and the mean normalized errors (MNEs) are less than 1 and 2% for January and August, respectively. It is also demonstrated that the ERSM technique could reproduce fairly well the response of PM??? to continuous changes of precursor emission levels between zero and 150%. Employing this new technique, we identify the major sources contributing to PM??? and its inorganic components in the YRD region. The nonlinearity in the response of PM??? to emission changes is characterized and the underlying chemical processes are illustrated.

  19. Assessing the nonlinear response of fine particles to precursor emissions: Development and application of an extended response surface modeling technique v1.0

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhao, B.; Wang, S. X.; State Environmental Protection Key Lab. of Sources and Control of Air Pollution Complex, Beijing; Xing, J.; Fu, K.; Fu, J. S.; Jang, C.; Zhu, Y.; Dong, X. Y.; Gao, Y.; et al

    2015-01-30

    An innovative extended response surface modeling technique (ERSM v1.0) is developed to characterize the nonlinear response of fine particles (PM???) to large and simultaneous changes of multiple precursor emissions from multiple regions and sectors. The ERSM technique is developed based on the conventional response surface modeling (RSM) technique; it first quantifies the relationship between PM??? concentrations and the emissions of gaseous precursors from each single region using the conventional RSM technique, and then assesses the effects of inter-regional transport of PM??? and its gaseous precursors on PM??? concentrations in the target region. We apply this novel technique with a widelymore »used regional chemical transport model (CTM) over the Yangtze River delta (YRD) region of China, and evaluate the response of PM??? and its inorganic components to the emissions of 36 pollutant–region–sector combinations. The predicted PM??? concentrations agree well with independent CTM simulations; the correlation coefficients are larger than 0.98 and 0.99, and the mean normalized errors (MNEs) are less than 1 and 2% for January and August, respectively. It is also demonstrated that the ERSM technique could reproduce fairly well the response of PM??? to continuous changes of precursor emission levels between zero and 150%. Employing this new technique, we identify the major sources contributing to PM??? and its inorganic components in the YRD region. The nonlinearity in the response of PM??? to emission changes is characterized and the underlying chemical processes are illustrated.« less

  20. Assessing the nonlinear response of fine particles to precursor emissions: Development and application of an extended response surface modeling technique v1.0

    SciTech Connect (OSTI)

    Zhao, B. [Tsinghua Univ., Beijing (China); Wang, S. X. [Tsinghua Univ., Beijing (China); State Environmental Protection Key Lab. of Sources and Control of Air Pollution Complex, Beijing (China); Xing, J. [U.S. Environmental Protection Agency, Research Triangle Park, NC (United States); Fu, K. [Tsinghua Univ., Beijing (China); Fu, J. S. [Univ. of Tennessee, Knoxville, TN (United States); Jang, C. [U.S. Environmental Protection Agency, Research Triangle Park, NC (United States); Zhu, Y. [South China Univ. of Technology (SCUT), Guangzhou (China); Dong, X. Y. [Univ. of Tennessee, Knoxville, TN (United States); Gao, Y. [Univ. of Tennessee, Knoxville, TN (United States); Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wu, W. J. [Tsinghua Univ., Beijing (China); Wang, J. D. [Tsinghua Univ., Beijing (China); Hao, J. M. [Tsinghua Univ., Beijing (China); State Environmental Protection Key Lab. of Sources and Control of Air Pollution Complex, Beijing (China)

    2015-01-01

    An innovative extended response surface modeling technique (ERSM v1.0) is developed to characterize the nonlinear response of fine particles (PM???) to large and simultaneous changes of multiple precursor emissions from multiple regions and sectors. The ERSM technique is developed based on the conventional response surface modeling (RSM) technique; it first quantifies the relationship between PM??? concentrations and the emissions of gaseous precursors from each single region using the conventional RSM technique, and then assesses the effects of inter-regional transport of PM??? and its gaseous precursors on PM??? concentrations in the target region. We apply this novel technique with a widely used regional chemical transport model (CTM) over the Yangtze River delta (YRD) region of China, and evaluate the response of PM??? and its inorganic components to the emissions of 36 pollutant–region–sector combinations. The predicted PM??? concentrations agree well with independent CTM simulations; the correlation coefficients are larger than 0.98 and 0.99, and the mean normalized errors (MNEs) are less than 1 and 2% for January and August, respectively. It is also demonstrated that the ERSM technique could reproduce fairly well the response of PM??? to continuous changes of precursor emission levels between zero and 150%. Employing this new technique, we identify the major sources contributing to PM??? and its inorganic components in the YRD region. The nonlinearity in the response of PM??? to emission changes is characterized and the underlying chemical processes are illustrated.

  1. 2014 Ocean Drilling Cita on Report Covering Cita ons Related to the

    E-Print Network [OSTI]

    2014 Ocean Drilling Cita on Report Covering Cita ons Related to the Deep Sea Drilling Project, Ocean Drilling Program, Integrated Ocean Drilling Program, and Interna onal Ocean Discovery Program from #12;22014 Ocean Drilling Cita on Report Introduc on At the end of each fiscal year, the Interna onal

  2. Rapid characterization of drill core and cutting mineralogy using...

    Open Energy Info (EERE)

    characterization of drill core and cutting mineralogy using infrared spectroscopy Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Rapid...

  3. Rotary acting shear valve for drilling fluid telemetry systems

    SciTech Connect (OSTI)

    Larronde, M.L.

    1986-12-16

    This patent describes a valve apparatus useful in a borehole drilling fluid telemetry system for transmitting data pulses from one end of a pipe string to another by imparting pressure pulses to a drilling fluid circulating down the pipe string, through a drilling member and up the annulus between the pipe string and borehole wall. The valve is operated in the drilling fluid flow path to modulate the flow of the drilling fluid and thereby impart detectable pressure pulses to the drilling fluid. The apparatus comprises a housing disposable within the drill string, adapted for the flow of drilling fluid therearound and formed with a passage therethrough for selectable flow communication between the drill string and the borehole annulus; a shear valve mounted within the housing across the passage and comprising a valve seat and rotational gate member having alignable seat and gate openings formed therethrough, the gate opening being movable in an arc into and out of axial alignment with the seat opening; and valve actuation means for coupling to the gate for rotationally moving the gate opening through an arc relative to the seat opening to open the passage and generate a pressure pulse. The valve actuation means comprises a first solenoid and cam means coupled thereto for translating the non-linear, axial forces of the solenoid into generally linear, rotational forces for rotating the valve gate.

  4. An overview of McKittrick coiled tubing drilling project

    SciTech Connect (OSTI)

    Ewert, D.P.; Ramagno, R.A.; Hurkmans, R.S.

    1995-12-31

    In an effort to reduce drilling costs on thermal wells, service companies began reducing casing sizes and well pad location sizes in 1993. Based on a successful four-well pilot project completed in early 1994 at the Belridge Field, a 115-well steam injector project was completed in the McKittrick Field in late 1994, of which 68 wells were drilled with coiled tubing. This paper will discuss why slimhole completions and coiled tubing drilling were selected for this project, the operational aspects of drilling 68 wells in 92 working days, and conclusions about the project.

  5. Fundamental Research on Percussion Drilling: Improved rock mechanics...

    Office of Scientific and Technical Information (OSTI)

    Fundamental Research on Percussion Drilling: Improved rock mechanics analysis, advanced simulation technology, and full-scale laboratory investigations Citation Details In-Document...

  6. GRED Studies and Drilling of Americulture State 2, Americulture...

    Open Energy Info (EERE)

    GRED Studies and Drilling of Americulture State 2, Americulture Tilapia Farm: Lightning Dock KGRA, Las Animas Valley, New Mexico Jump to: navigation, search OpenEI Reference...

  7. Title 11 Alaska Administrative Code 87 Geothermal Drilling and...

    Open Energy Info (EERE)

    Title 11 Alaska Administrative Code 87 Geothermal Drilling and Conservation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  8. Microhole Arrays Drilled With Advanced Abrasive Slurry Jet Technology...

    Open Energy Info (EERE)

    Drilled With Advanced Abrasive Slurry Jet Technology To Efficiently Exploit Enhanced Geothermal Systems Geothermal Project Jump to: navigation, search Last modified on July 22,...

  9. Rapid Characterization of Drill Core and Cutting Mineralogy using...

    Open Energy Info (EERE)

    to geophysical logs. We have successfully identifiedlayered silicates, zeolites, opal, calcite, and iron oxides and hydroxidesin drill cuttings from geothermal wells. In...

  10. Recovery Act Validation of Innovative Exploration Techniques Pilgrim Hot Springs, Alaska

    SciTech Connect (OSTI)

    Holdmann, Gwen

    2015-04-30

    Drilling and temperature logging campaigns between the late 1970's and early 1980’s measured temperatures at Pilgrim Hot Springs in excess of 90°C. Between 2010 and 2014 the University of Alaska used a variety of methods including geophysical surveys, remote sensing techniques, heat budget modeling, and additional drilling to better understand the resource and estimate the available geothermal energy.

  11. Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well Drilling

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Discover new 260F and 300F geothermal reservoirs in Oregon. To demonstrate the application of high precision geophysics for well targeting. Demonstrate a combined testing approach to Flowing Differential Self Potential (FDSP) and electrical tomography resistivity as a guide to exploration and development. Demonstrate utility and benefits of sump-less drilling for a low environmental impact. Create both short and long term employment through exploration, accelerated development timeline and operation.

  12. Sound Coiled-Tubing Drilling Practices

    SciTech Connect (OSTI)

    Williams, Thomas; Deskins, Greg; Ward, Stephen L.; Hightower, Mel

    2001-09-30

    This Coiled-Tubing Drilling (CTD) Sound Practices Manual provides tools needed by CTD engineers and supervisors to plan, design and perform safe, successful CTD operations. As emphasized throughout, both careful planning and attention to detail are mandatory for success. A bibliography of many useful CTD references is presented in Chapter 6. This manual is organized according to three processes: 1) Pre-Job Planning Process, 2) Operations Execution Process, and 3) Post-Job Review Process. Each is discussed in a logical and sequential format.

  13. Sandia Energy - Geothermal Energy & Drilling Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)Geothermal Energy & Drilling Technology Home Stationary Power Energy

  14. Salton Sea Scientific Drilling Project: A summary of drilling and engineering activities and scientific results

    SciTech Connect (OSTI)

    Ross, H.P.; Forsgren, C.K. (eds.)

    1992-04-01

    The Salton Sea Scientific g Project (SSSDP) completed the first major well in the United States Continental Scientific Drilling Program. The well (State 2-14) was drilled to 10,W ft (3,220 m) in the Salton Sea Geothermal Field in California's Imperial Valley, to permit scientific study of a deep, high-temperature portion of an active geothermal system. The program was designed to investigate, through drilling and testing, the subsurface thermal, chemical, and mineralogical environments of this geothermal area. Extensive samples and data, including cores, cuttings, geothermal fluids and gases, and geophysical logs, were collected for future scientific analysis, interpretation, and publication. Short duration flow tests were conducted on reservoirs at a depth of approximately 6,120 ft (1,865 m) and at 10,136 ft (3,089 m). This report summarizes all major activities of the SSSDP, from project inception in the fall of 1984 through brine-pond cleanup and site restoration, ending in February 1989. This report presents a balanced summary of drilling, coring, logging, and flow-test operations, and a brief summary of technical and scientific results. Frequent reference is made to original records, data, and publication of results. The report also reviews the proposed versus the final well design, and operational summaries, such as the bit record, the casing and cementing program, and the coring program. Summaries are and the results of three flow tests. Several teamed during the project.

  15. Caldera processes and magma-hydrothermal systems continental scientific drilling program: thermal regimes, Valles caldera research, scientific and management plan

    SciTech Connect (OSTI)

    Goff, F.; Nielson, D.L. (eds.)

    1986-05-01

    Long-range core-drilling operations and initial scientific investigations are described for four sites in the Valles caldera, New Mexico. The plan concentrates on the period 1986 to 1993 and has six primary objectives: (1) study the origin, evolution, physical/chemical dynamics of the vapor-dominated portion of the Valles geothermal system; (2) investigate the characteristics of caldera fill and mechanisms of caldera collapse and resurgence; (3) determine the physical/chemical conditions in the heat transfer zone between crystallizing plutons and the hydrothermal system; (4) study the mechanism of ore deposition in the caldera environment; (5) develop and test high-temperature drilling techniques and logging tools; and (6) evaluate the geothermal resource within a large silicic caldera. Core holes VC-2a (500 m) and VC-2b (2000 m) are planned in the Sulphur Springs area; these core holes will probe the vapor-dominated zone, the underlying hot-water-dominated zone, the boiling interface and probable ore deposition between the two zones, and the deep structure and stratigraphy along the western part of the Valles caldera fracture zone and resurgent dome. Core hole VC-3 will involve reopening existing well Baca number12 and deepening it from 3.2 km (present total depth) to 5.5 km, this core hole will penetrate the deep-crystallized silicic pluton, investigate conductive heat transfer in that zone, and study the evolution of the central resurgent dome. Core hole VC-4 is designed to penetrate deep into the presumably thick caldera fill in eastern Valles caldera and examine the relationship between caldera formation, sedimentation, tectonics, and volcanism. Core hole VC-5 is to test structure, stratigraphy, and magmatic evolution of pre-Valles caldera rocks, their relations to Valles caldera, and the influences of regional structure on volcanism and caldera formation.

  16. Support for Offshore Oil and Gas Drilling among the California Public

    E-Print Network [OSTI]

    Smith, Eric R.A.N.

    2003-01-01

    005 "Support for Offshore Oil and Gas Drilling Among theSupport for Offshore Oil and Gas Drilling among theSupport for Offshore Oil and Gas Drilling among the

  17. Preseismic Velocity Changes Observed from Active Source Monitoring at the Parkfield SAFOD Drill Site

    E-Print Network [OSTI]

    Niu, Fenglin

    2008-01-01

    at the Parkfield SAFOD Drill Site Fenglin Niu 1 , Paul G.conducted at the SAFOD drill site. Over a two-month periodthe Parkfield SAFOD drill site, where the experiment was

  18. Public Support for Oil and Gas Drilling in California's Forests and Parks

    E-Print Network [OSTI]

    Smith, Eric R.A.N.; Carlisle, Juliet; Michaud, Kristy

    2004-01-01

    009 "Public Support for Oil and Gas Drilling in California’sPublic Support for Oil and Gas Drilling in California’sPublic Support for Oil and Gas Drilling in California’s

  19. Learning by Drilling: Inter-Firm Learning and Relationship Persistence in the Texas Oilpatch

    E-Print Network [OSTI]

    KELLOGG, RYAN M

    2007-01-01

    is particularly good at drilling wells in certain types offor depth, drilling time, and well type are presented ingas. The objective of drilling a well is to penetrate these

  20. New Environmentally Friendly Dispersants for High Temperature Invert-Emulsion Drilling Fluids Weighted by Manganese Tetraoxide 

    E-Print Network [OSTI]

    Rehman, Abdul

    2012-02-14

    This thesis provides a detailed evaluation of different environmentally friendly dispersants in invert-emulsion drilling fluids that can be used to drill wells under difficult conditions such as HPHT. The drilling fluid is weighted by manganese...

  1. Evaluation of liquid lift approach to dual gradient drilling 

    E-Print Network [OSTI]

    Okafor, Ugochukwu Nnamdi

    2008-10-10

    In the past, the oil and gas industry has typically used the single gradient system to drill wells offshore. With this system the bottom hole pressure was controlled by a mud column extending from the drilling rig to the bottom of the wellbore...

  2. Introduction to the Ocean Drilling Program JOIDES RESOLUTION

    E-Print Network [OSTI]

    Louis E. Garrison Deputy Director #12;11 Material in this publication may be copied without restraint of This Handbook 1 B. The Ocean Drilling Program in Brief 1 C . JOI and JOIDES 3 D. National ODP Structures 4 E Submission 7 D. Scientific Participation in the Ocean Drilling Program 8 1. Selection Process for Co

  3. Water's Journey Through the Shale Gas Drilling and

    E-Print Network [OSTI]

    Walter, M.Todd

    Water's Journey Through the Shale Gas Drilling and Production Processes in the Mid-Atlantic Region: Marcellus shale drilling in progress, Beaver Run Reservoir, Westmoreland County. Credit: Robert Donnan. Gas in the Marcellus shale natural gas industry in the Mid-Atlantic region. Using publicly available information, we

  4. Resonant acoustic transducer system for a well drilling string

    DOE Patents [OSTI]

    Nardi, Anthony P. (Burlington, MA)

    1981-01-01

    For use in transmitting acoustic waves propated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting a resonant operation in the desired low frequency range.

  5. Resonant acoustic transducer system for a well drilling string

    DOE Patents [OSTI]

    Kent, William H. (Westford, MA); Mitchell, Peter G. (Concord, MA)

    1981-01-01

    For use in transmitting acoustic waves propagated along a well drilling string, a piezoelectric transducer is provided operating in the relatively low loss acoustic propagation range of the well drilling string. The efficiently coupled transmitting transducer incorporates a mass-spring-piezoelectric transmitter combination permitting resonant operation in the desired low frequency range.

  6. The effect of wellbore dynamics on data acquisition for pressure detection and the misuse of drilling parameters for surnormal pressure detection in the Gulf of Mexico 

    E-Print Network [OSTI]

    Damron, Earl Bruce

    1981-01-01

    leases, offshore drilling in the Gu1f of Mexico has escalated to the point of being the most active area in the continental United States. This massive exploration and development program by the oil and gas industry has proven to be a marginal... adventure at best due to price controls on oil and gas in inteistate trade and the rapidly increasing cost of offshore drilling. In the last decade, the cost of drilling a 10, 000 foot exploratory we' ll has almost quadrupled. Because of the escalating...

  7. Final Report on Development of Optimized Field-Reversed Configuration Plasma Formation Techniques for Magnetized Target Fusion

    SciTech Connect (OSTI)

    Lynn, Alan

    2013-11-01

    The University of New Mexico (UNM) proposed a collaboration with Los Alamos National Laboratory (LANL) to develop and test methods for improved formation of field-reversed configuration (FRC) plasmas relevant to magnetized target fusion (MTF) energy research. MTF is an innovative approach for a relatively fast and cheap path to the production of fusion energy that utilizes magnetic confinement to assist in the compression of a hot plasma to thermonuclear conditions by an external driver. LANL is currently pursing demonstration of the MTF concept via compression of an FRC plasma by a metal liner z-pinch in conjunction with the Air Force Research Laboratory in Albuquerque, NM. A key physics issue for the FRC's ultimate success as an MTF target lies in the initial pre-ionization (PI) stage. The PI plasma sets the initial conditions from which the FRC is created. In particular, the PI formation process determines the amount of magnetic flux that can be trapped to form the FRC. A ringing theta pinch ionization (RTPI) technique, such as currently used by the FRX-L device at LANL, has the advantages of high ionization fraction, simplicity (since no additional coils are required), and does not require internal electrodes which can introduce impurities into the plasma. However RTPI has been shown to only trap #24;50% of the initial bias flux at best and imposes additional engineering constraints on the capacitor banks. The amount of trapped flux plays an important role in the FRC's final equilibrium, transport, and stability properties, and provides increased ohmic heating of the FRC through induced currents as the magnetic field decays. Increasing the trapped flux also provides the route to greatest potential gains in FRC lifetime, which is essential to provide enough time to translate and compress the FRC effectively. In conjunction with LANL we initially planned to develop and test a microwave break- down system to improve the initial PI plasma formation. The UNM team would design the microwave optics and oversee the fabrication and assembly of all components and assist with integration into the FRX-L machine control system. LANL would provide a preexisting 65 kW X-band microwave source and some associated waveguide hardware. Once constructed and installed, UNM would take the lead in operating the microwave breakdown system and conducting studies to optimize its use in FRC PI formation in close cooperation with the needs of the LANL MTF team. In conjunction with our LANL collaborators, we decided after starting the project to switch from a microwave plasma breakdown approach to a plasma gun technology to use for enhanced plasma formation in the FRX-L field-reversed configuration experiment at LANL. Plasma guns would be able to provide significantly higher density plasma with greater control over its distribution in time and space within the experiment. This would allow greater control and #12;ne-tuning of the PI plasma formed in the experiment. Multiple plasma guns would be employed to fill a Pyrex glass test chamber (built at UNM) with plasma which would then be characterized and optimized for the MTF effort.

  8. Significant results of deep drilling at Elk Hills, Kern County, California

    SciTech Connect (OSTI)

    Fishburn, M.D. (Dept. of Energy, Elk Hills, CA (USA))

    1990-05-01

    Naval Petroleum Reserve 1 (Elk Hills) is located in the southwestern San Joaquin basin one of the most prolific oil-producing areas in the US. Although the basin is in a mature development stage, the presence of favorable structures and high-quality source rocks continue to make the deeper parts of the basin, specifically Elk Hills, an inviting exploration target. Of the three deep tests drilled by the US Department of Energy since 1976, significant geologic results were achieved in two wells. Well 987-25R reached low-grade metamorphic rock at 18,761 ft after penetrating over 800 ft of salt below the Eocene Point of Rocks Sandstone. In well 934-29R, the deepest well in California, Cretaceous sedimentary rocks were encountered at a total depth of 24,426 ft. In well 934-29R several major sand units were penetrated most of which encountered significant gas shows. Minor amounts of gas with no water were produced below 22,000 ft. In addition, production tests at 17,000 ft produced 46{degree} API gravity oil. Geochemical analysis of cores and cuttings indicated that the potential for hydrocarbon generation exists throughout the well and is significant because the possibility of hydrocarbon production exists at a greater depth than previously expected. A vertical seismic profile in the well indicated that basement at this location is at approximately 25,500 ft. Successful drilling of well 934-29R was attributed to the use of an oil-based mud system. The well took 917 days to drill, including 9,560 rotating hr with 134 bits. Bottom-hole temperature was 431{degree}F and pressures were approximately 18,000 psi. The high overburden pressure at 24,000 ft created drilling problems that ultimately led to the termination of drilling at 24,426 ft.

  9. Drilling Sideways - A Review of Horizontal Well Technology and Its Domestic Application

    Reports and Publications (EIA)

    1993-01-01

    Focuses primarily on domestic horizontal drilling applications, past and present, and on salient aspects of current and near-future horizontal drilling and completion technology.

  10. Flexible shaft and roof drilling system

    DOE Patents [OSTI]

    Blanz, John H. (Carlisle, MA)

    1981-01-01

    A system for drilling holes in the roof of a mine has a flexible shaft with a pair of oppositely wound, coaxial flat bands. One of the flat bands defines an inner spring that is wound right handed into a helical configuration, adjacent convolutions being in nesting relationship to one another. The other flat band defines an outer spring that is wound left handed into a helical configuration about the inner band, adjacent convolutions being nesting relationship with one another. A transition member that is configured to hold a rock bit is mounted to one end of the flexible shaft. When torque and thrust are applied to the flexible shaft by a driver, the inner spring expands outwardly and the outer spring contracts inwardly to form a relatively rigid shaft.

  11. Computation modeling of drill bits : a new method for reproducing bottom hole geometry and a second-order explicit integrator via composition for coupled rotating rigid bodies

    E-Print Network [OSTI]

    Endres, Lanson Adam

    2007-01-01

    rotary drilling. A method of drilling wells where the bit isin drilling to remove cuttings from a borehole as well asDrilling System The bit is just one part of a complex system required to drill a well.

  12. Horizontal underbalanced drilling of gas wells with coiled tubing

    SciTech Connect (OSTI)

    Cox, R.J.; Li, J.; Lupick, G.S.

    1999-03-01

    Coiled tubing drilling technology is gaining popularity and momentum as a significant and reliable method of drilling horizontal underbalanced wells. It is quickly moving into new frontiers. To this point, most efforts in the Western Canadian Basin have been focused towards sweet oil reservoirs in the 900--1300 m true vertical depth (TVD) range, however there is an ever-increasing interest in deeper and gas-producing formations. Significant design challenges on both conventional and coiled tubing drilling operations are imposed when attempting to drill these formations underbalanced. Coiled tubing is an ideal technology for underbalanced drilling due to its absence of drillstring connections resulting in continuous underbalanced capabilities. This also makes it suitable for sour well drilling and live well intervention without the risk of surface releases of reservoir gas. Through the use of pressure deployment procedures it is possible to complete the drilling operation without need to kill the well, thereby maintaining underbalanced conditions right through to the production phase. The use of coiled tubing also provides a means for continuous wireline communication with downhole steering, logging and pressure recording devices.

  13. Hole cleaning imperative in coiled tubing drilling operations

    SciTech Connect (OSTI)

    Rameswar, R.M.; Mudda, K.

    1995-09-01

    Annular flow modeling in coiled tubing applications is essential for optimizing mud rheology and keeping the hole clean. Cuttings transport in coiled tubing drilling must be optimized, particularly the modeling of hole cleaning capabilities. The effects of two different muds in contrasting geometries on hold cleaning efficiency are considered, with the simulation performed using Petrocalc 14. Coiled tubing is widely used to drill new vertical and horizontal wells, and in re-entry operations. Horizontal well problems are subsequently modeled, where annular eccentricities can range anywhere from concentric to highly offset, given the highly buckled or helically deflected states of many drill coils.

  14. Tension capacity of two drilled and grouted piles 

    E-Print Network [OSTI]

    Kubena, Mark Edward

    1989-01-01

    and grouted piles are being proposed as an alternate method for the foundation of deepwater structures. Drilled and grouted piles are composite piles formed by drilling an oversized hole, inserting a smaller steel casing or pile to the bottom of the open...TENSION CAPACITY OF TWO DRILLED AND GROUTED PILES A Thesis by MARK EDWARD KUBENA Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE December 1989...

  15. Development of a Hydrothermal Spallation Drilling System for EGS Geothermal

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (UtilityInstrumentsArea (DOE GTP) Jump to: navigation,SystemMEQ in EGSProject |

  16. Technology Development and Field Trials of EGS Drilling Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaics »Tankless WaterEnergyJanuary28-98 -Price ParityDepartment of

  17. Design and Analysis of a Test Rig for Modeling the Bit/Formation Interface in Petroleum Drilling Applications 

    E-Print Network [OSTI]

    Wilson, Joshua Kyle

    2013-04-11

    and horizontal wells and measuring the effects of various factors on the stability of perturbations on the system. A test rig concept has been developed to accurately measure the interaction forces and torques between the bit, formation and fluids during drilling...

  18. INTEGRATED DRILLING SYSTEM USING MUD ACTUATED DOWN HOLE HAMMER AS PRIMARY ENGINE

    SciTech Connect (OSTI)

    John V. Fernandez; David S. Pixton

    2005-12-01

    A history and project summary of the development of an integrated drilling system using a mud-actuated down-hole hammer as its primary engine are given. The summary includes laboratory test results, including atmospheric tests of component parts and simulated borehole tests of the hammer system. Several remaining technical hurdles are enumerated. A brief explanation of commercialization potential is included. The primary conclusion for this work is that a mud actuated hammer can yield substantial improvements to drilling rate in overbalanced, hard rock formations. A secondary conclusion is that the down-hole mud actuated hammer can serve to provide other useful down-hole functions including generation of high pressure mud jets, generation of seismic and sonic signals, and generation of diagnostic information based on hammer velocity profiles.

  19. Glass Buttes Exploration and Drilling: 2010 Geothermal Technologies Program Peer Review Presentation, Walsh, et al, Ormat

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Zemach, Ezra

    Glass Buttes Exploration and Drilling: 2010 Geothermal Technologies Program Peer Review Presentation, Walsh, et al, Ormat

  20. Determining root causes of drilling problems by combining cases and general knowledge

    E-Print Network [OSTI]

    Aamodt, Agnar

    -based, knowledge intensive, oil well drilling 1 Introduction Drilling of oil wells is an expensive offshore based reasoning to improve efficiency of oil well drilling. Their focus was on lost circulation, whichDetermining root causes of drilling problems by combining cases and general knowledge Samad