Powered by Deep Web Technologies
Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Uranium Leasing Program Draft PEIS Public Comment Period Extended...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Uranium Leasing Program Draft PEIS Public Comment Period Extended to May 31, 2013 Uranium...

2

Public Comment Period Re-Opened for the Uranium Leasing Program PEIS |  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Comment Period Re-Opened for the Uranium Leasing Program Public Comment Period Re-Opened for the Uranium Leasing Program PEIS Public Comment Period Re-Opened for the Uranium Leasing Program PEIS May 28, 2013 - 5:37pm Addthis Public Comment Period Re-Opened for the Uranium Leasing Program PEIS The U.S. Department of Energy is re-opening the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS-0472D). DOE made the Draft ULP PEIS available for public comment on March 15, 2013 (78 FR 16500). The public comment period for the Draft ULP PEIS originally was to end on May 16, 2013, and an extension to May 31, 2013 was announced on April 23, 2013 (78 FR 23926). In response to a public request for additional review time, DOE re-opens the public comment period, which will now close on July 1,

3

Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Leasing Program Draft Programmatic EIS Issued for Public Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment March 15, 2013 - 11:08am Addthis Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment DOE has issued the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)(DOE/EIS-0472D) for public review and comment. The document is available here and on the ULP PEIS website. Under the Uranium Leasing Program, the DOE Office of Legacy Management administers 31 tracts of land in Mesa, Montrose, and San Miguel counties that are leased to private entities to mine uranium and vanadium. The program covers an area of approximately 25,000 acres. No mining operations are active on the ULP lands at this time. DOE is preparing the ULP PEIS to

4

DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013.

5

Draft Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development in Six Southwestern States (DES 10-59; DOE/EIS-0403) Responsible Agencies: The U.S. Department of the Interior (DOI) Bureau of Land Management (BLM) and the U.S. Department of Energy (DOE) are co-lead agencies. Nineteen cooperating agencies participated in the preparation of this PEIS: U.S. Department of Defense; U.S. Bureau of Reclamation; U.S. Fish and Wildlife Service; U.S. National Park Service; U.S. Environmental Protection Agency, Region 9; U.S. Army Corps of Engineers, South Pacific Division; Arizona Game and Fish Department; California Energy Commission; California Public Utilities Commission; Nevada Department of Wildlife; N-4 Grazing Board, Nevada; Utah Public Lands Policy Coordination Office; Clark County, Nevada,

6

BLM Announces Second Extension of Public Comment Period for Draft Solar PEIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BLM Announces Second Extension of Public Comment Period for Draft Solar PEIS BLM Announces Second Extension of Public Comment Period for Draft Solar PEIS U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT NEWS RELEASE Release Date: 04/15/11 Contacts: David Quick, (202) 912-7413 BLM Announces Second Extension of Public Comment Period for Draft Solar PEIS The Bureau of Land Management (BLM) today announced a two-week extension of the public comment period for the Draft Solar Programmatic Environmental Impact Statement (Draft Solar PEIS), a joint effort with the Department of Energy. The agencies had previously provided for a 120-day public comment period on the Draft Solar PEIS. Because of numerous requests, the agencies are extending the comment period by an additional two weeks beyond April 16, 2011. The comment period will now run until May 2, 2011. No additional public meetings will be held during the

7

WindEnergyPEIS  

NLE Websites -- All DOE Office Websites (Extended Search)

all or parts of the States of Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota. The draft PEIS assesses environmental impacts associated with wind energy...

8

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California October 1999 [This page intentionally left blank.] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS CONTACT: For additional information on For general information on the NEPA this statement write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-293 Office of NEPA Policy and Assistance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW

9

Summary: Draft Uranium Leasing Program Programmatic Environmental Impact Statement: DOE/EIS 0472-D, March 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary: Draft ULP PEIS March 2013 Summary: Draft ULP PEIS March 2013 COVER SHEET 1 2 3 Lead Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: The cooperating agencies are U.S. Department of the Interior (DOI), 6 Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado 7 Department of Transportation (CDOT); Colorado Division of Reclamation, Mining, and Safety 8 (CDRMS); Colorado Parks and Wildlife (CPW); Mesa County Commission; Montrose County 9 Commission; San Juan County Commission; San Miguel County Board of Commissioners; the 10 Pueblo of Acoma Tribe; the Pueblo de Cochiti Tribe; the Pueblo de Isleta Tribe; the Navajo 11 Nation; and the Southern Ute Indian Tribe. 12 13 Title: Draft Uranium Leasing Program Programmatic Environmental Impact Statement 14

10

Pei Zhai  

NLE Websites -- All DOE Office Websites (Extended Search)

Pei Zhai Pei Zhai Sustainable Energy Systems Group Lawrence Berkeley National Laboratory 1 Cyclotron Road MS 90R2002 Berkeley CA 94720 Office Location: 90-2024G (510) 495-2147...

11

DOE Extends Public Comment Period for the Draft Uranium Leasing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Uranium Leasing the Draft Uranium Leasing Program Programmatic Environmental Impact Statement DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement June 3, 2013 - 3:05pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov May 29, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to July 1, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in

12

Documents: Final PEIS  

NLE Websites -- All DOE Office Websites (Extended Search)

Final PEIS Search Documents: Search PDF Documents View a list of all documents Final Programmatic EIS DOEEIS-0269 Final Programmatic Environmental Impact Statement for...

13

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Closing the Circle: Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table of Contents Part I: Making of the Nuclear Weapons Complex, 1942-1955 1 The Manhattan Project: Genesis of the Complex 1 2 Health and Safety Concerns Environmental and Waste Management Concerns 3 The Atomic Energy Commission: Expansion of the Complex

14

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

User Access Policy - Version 1.0 User Access Policy - Version 1.0 DOE NSRC User Access Policy December 9, 2002 page 1 DRAFT General Policies and Procedures for User Access to the DOE Nanoscale Science Research Centers 1. Preamble The mission of the U.S. Department of Energy (DOE) Nanoscale Science Research Centers (NSRCs) is to support users in doing outstanding science in a safe environment. To this end, each Center must have: * An array of state-of-the-art equipment and laboratories for synthesis, fabrication, characterization, and simulation of nanoscale materials and structures * A skilled staff to support this equipment, users, and the associated science but above all * A user scientific program that provides leadership in nanoscale science and technology This document addresses the policies and procedures for user access to the NSRCs.

15

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

⇒ ⇒ DRAFT 19 December 2012⇐= Status of the heaviest elements as of January 2013 Don Groom, Particle Data Group Superheavy elements are normally synthesized by exposing a high-Z target to a 2.5-7.5 MeV/u ion beam such as 48 Ca or 70 Zn. The target can be a stable isotope such as 208 Pb or 209 Bi; in this case the process is called cold fusion. If the target is radioactive (an actinide), it is a "hot fusion" reaction. Targets as heavy as 249 Bk have been used. Since fusion is followed by neutron loss (e.g. 248 Cf( 48 Ca,4n) 292 Lv), the atomic numbers of the beam and target nuclei determine whether the fusion products have even or odd Z. The main laboratories involved are at Dubna, Darmstadt, Berkeley, and RIKEN Nashina Center. Fusion cross sections steadily decrease with increasing Z, and are in the picobarn range for the heaviest elements. The cross section can be optimized for a given

16

Program Updates | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS; Groundwater Remedy Is Evaluated...

17

Pure Energy Inc PEI | Open Energy Information  

Open Energy Info (EERE)

City, Nevada Zip 89703 Product Manufactures a small volume of alkaline rechargeable batteries. References Pure Energy Inc (PEI)1 LinkedIn Connections CrunchBase Profile No...

18

Central Internet Database (CID) PEIS Settlement Information  

Office of Environmental Management (EM)

About the CID > PEIS About the CID > PEIS Settlement Agreement Information Requirements Central Internet Database CID Photo Banner PEIS Settlement Agreement Information Requirements Information Categories: Contaminated environmental media, contaminated facilities, and waste managed by the DOE Environmental Management (EM) program Contaminated facilities and waste generated or managed by the DOE Offices of Defense Programs (DP) Exit CID Website , Science (SC) Exit CID Website , and Nuclear Energy (NE) Exit CID Website . DOE-managed domestic/foreign research reactor spent nuclear fuel (spent fuel from commercial reactors is excluded ). Sites governed by Section 151(b) of the Nuclear Waste Policy Act (NWPA)* Adobe PDF Document Exit CID Website , as amended, upon the transfer of those sites to DOE ownership.

19

News Release: DOE to Host Public Scoping Meetings on Uranium Leasing PEIS |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE to Host Public Scoping Meetings on Uranium DOE to Host Public Scoping Meetings on Uranium Leasing PEIS News Release: DOE to Host Public Scoping Meetings on Uranium Leasing PEIS July 29, 2011 - 2:53pm Addthis News Contact: DOE, Laura Kilpatrick Esq., Realty Officer (720) 880-4338 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 GRAND JUNCTION, Colo. - The U.S. Department of Energy is hosting public scoping meetings to invite comments on the scope of the Draft Uranium Leasing Program Programmatic Environmental Impact Statement. The meetings will be held at the locations and dates listed below and will begin at 6:30 p.m. with an opportunity to sign-in to provide oral comments. A formal presentation by DOE officials will start at 7:00 p.m. followed by public comments starting at 7:15 p.m.

20

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

22

Poverty-Environment Initiative (PEI) | Open Energy Information  

Open Energy Info (EERE)

Poverty-Environment Initiative (PEI) Poverty-Environment Initiative (PEI) Jump to: navigation, search Name Poverty-Environment Initiative (PEI) Agency/Company /Organization UNDP, UNEP Partner Poverty and Environment Partnership (PEP), WRI, WWF, OECD, IISD, IIED Topics Low emission development planning Website http://www.unpei.org/ Program Start 2005 References Poverty-Environment Initiative (PEI)[1] Overview The Poverty-Environment Initiative (PEI) of the United Nations Development Programme (UNDP) and the United Nations Environment Programme (UNEP) is a global UN-led programme that supports country-led efforts to mainstream poverty-environment linkages into national development planning. The PEI provides financial and technical assistance to government partners to set up institutional and capacity strengthening programmes and carry out

23

Waste Management Programmatic Environmental Impact Statement (WM PEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) is a nationwide study examining the environmental impacts of managing more than 2 million cubic meters of radioactive wastes from past, present, and future DOE activities. The WM PEIS will assist the U.S. Department of Energy (DOE) in improving the efficiency and reliability of management of its current and anticipated volumes of radioactive and hazardous wastes and will help DOE continue to comply with applicable laws and regulations and protect workers, public health and safety, and the environment. The WM PEIS

24

Final DUF6 PEIS: Volume 2: Appendix J; Transportation  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation Transportation Depleted UF 6 PEIS J-i APPENDIX J: ENVIRONMENTAL IMPACTS OF TRANSPORTATION OF UF 6 CYLINDERS, URANIUM OXIDE, URANIUM METAL, AND ASSOCIATED MATERIALS Transportation Depleted UF 6 PEIS J-ii Transportation Depleted UF 6 PEIS J-iii CONTENTS (APPENDIX J) NOTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-vi J.1 SUMMARY OF TRANSPORTATION OPTION IMPACTS . . . . . . . . . . . . . . . . . . J-3 J.2 TRANSPORTATION MODES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-8 J.2.1 Truck Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-8 J.2.2 Rail Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-9 J.2.3 Transportation Options Considered But Not Analyzed in Detail . . . . . . . . . . J-9 J.3 IMPACTS OF OPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-10 J.3.1

25

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 23060 of 26,764 results. 51 - 23060 of 26,764 results. Article Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment DOE has issued the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)(DOE/EIS-0472D) for public review and comment. The public comment period ends May 16, 2013. Under the Uranium Leasing Program, the DOE Office of Legacy Management administers 31 tracts of land in Mesa, Montrose, and San Miguel counties that are leased to private entities to mine uranium and vanadium. The program covers an area of approximately 25,000 acres. No mining operations are active on the ULP lands at this time. DOE is preparing the ULP PEIS to analyze the reasonably foreseeable potential environmental impacts, including the site-specific

26

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 4:31pm Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

27

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to

28

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 11:31am Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

29

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

30

News Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 17, 2013 April 17, 2013 DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013. March 15, 2013 Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment DOE has issued the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)(DOE/EIS-0472D) for public review and comment. The public comment period ends May 16, 2013. Under the Uranium Leasing Program, the DOE Office of Legacy Management administers 31 tracts of land in Mesa, Montrose, and San Miguel counties that are leased to private

31

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

32

Notice of Intent (NOI) to Prepare DUF6 PEIS  

NLE Websites -- All DOE Office Websites (Extended Search)

1, No. 17 / Thursday, January 25, 1996 / Notice 1, No. 17 / Thursday, January 25, 1996 / Notice [Pages 2239-2242] From the Federal Register Online via GPO Access [wais.access.gpo.gov] Alternative Strategies for the Long-Term Management and Use o f Depleted Uranium Hexafluoride AGENCY: Department of Energy ACTION: Notice of Intent (NOI). SUMMARY: The Department of Energy (DOE) announces its intent to prepare a programmatic environmental impact statement (PEIS) pursuant to the National Environmental Policy Act (NEPA) of 1969 (42 USC 4321 et seq.). The PEIS will assess the potential environmental impacts of alternative strategies for the long-term management and use of 560,000 metric tons of depleted uranium hexafluoride (UF 6 ) currently stored in cylinders at DOE's three gaseous diffusion plant sites located near Paducah, Kentucky; Portsmouth, Ohio; and Oak

33

EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management The Department of Energy (DOE) announces the availability of the Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility(NIF) Project Specific Analysis portion (Volume III, Appendix I) of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS) DOE/EIS-0236-S1 for public review and comment. EIS-0236-S1-NOA_DEIS-1999.pdf More Documents & Publications EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

34

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 U.S. Department of Energy, Office of Nuclear Energy DOE/EIS-0396 Summary Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement October 2008 Summary Prepared by: DOE/EIS-0396 SUMMARY Summary GNEP Draft PEIS S-i Table of Contents S.1 INTRODUCTION................................................................................................................... 1 S.1.1 Purpose and Need for Agency Action ........................................................................ 3 S.1.1.1 Energy/Electricity ................................................................................................... 3 S.1.1.2 Spent Nuclear Fuel Disposal and Waste Reduction

35

DRAFT DRAFT DRAFT Forecasting Electricity Demand  

E-Print Network (OSTI)

prices. With the medium natural gas price assumptions, the Council currently is seeing draft spot market for Northwest smelters. Since electricity prices are related to natural gas prices in the long-term, and high natural gas prices are associated with the high economic growth case, it may now make more sense to assume

36

EIS-0236-SA6; Draft Supplemental Analysis: Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile, Stewardship  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/25/99 6/25/99 DRAFT SUPPLEMENT ANALYSIS: PIT MANUFACTURING FACILITIES AT LOS ALAMOS NATIONAL LABORATORY, STOCKPILE STEWARDSHIP AND MANAGEMENT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT June 1999 SUMMARY ............................................................................................................................... 3 INTRODUCTION ..................................................................................................................... 3 Purpose of this Document .................................................................................................................................. 3 Background - SSM PEIS ...................................................................................................................................

37

EIS-0286: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide capabilities to continue, or modify, the way it treats, stores, and/or disposes of existing and anticipated quantities of solid LLW, MLLW, TRU waste, and ILAW at the Hanford Site in order to protect human health and the environment; facilitate cleanup at Hanford and other DOE facilities; take actions consistent with decisions reached by DOE under the WM PEIS; comply with local, State, and federal laws and regulations; and meet other obligations such as the Hanford Federal Facility Agreement and Consent Order (also referred to as the Tri-Party Agreement, or TPA) (Ecology et al. 1989).

38

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONSIBLE AGENCY: United States Department of Energy (DOE) RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE/EIS-0396) CONTACT: For further information on this PEIS, For general information on the DOE National write or call: Environmental Policy Act (NEPA) process, write or call: Mr. Francis Schwartz Carol Borgstrom, Director GNEP PEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Office of Nuclear Energy, NE-5 U.S. Department of Energy U.S. Department of Energy 1000 Independence Avenue, SW 1000 Independence Avenue, SW Washington, DC 20585 Washington, DC 20585 (202) 586-4600 (866) 645-7803 or leave a message at 1-800-472-2756 Abstract: The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the

39

Draft 2013 Annual Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft 2013 Annual Plan Draft 2013 Annual Plan Section 999: Draft 2013 Annual Plan Section 999 - Draft 2013 Annual Plan...

40

Final Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development in Six Southwestern States  

E-Print Network (OSTI)

#12;#12;#12;#12;Final Programmatic Environmental Impact Statement (PEIS) for Solar Energy;#12;Final Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development in Six-scale solar energy development in six southwestern states.1 For the BLM, this includes the evaluation of a new

Argonne National Laboratory

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

First draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group By The Regulatory Assistance Project Bob Anderson Associate Draft January 15, 2004 Transmission Planning: Institutional Issues in the West Page i Table of Contents Introduction......................................................................................................................... 1 Background-The Existing Transmission Planning Landscape......................................... 3 Interconnection-wide Transmission Planning ................................................................ 3 Seams Steering Group-Western Interconnection (SSG-WI) ...................................... 3 Western Electricity Coordinating Council (WECC)...................................................

42

EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: EPA Notice of Availability of the Supplement to the -S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is EIS-0403D-S1. Comment Period Ends: 01/27/12 Comments may be submitted to: Solar Energy Draft PEIS Argonne National Laboratory 9700 S. Cass Avenue--EVS/240 Argonne, Illinois 60439 Web site: DOE and BLM recommend using the online comment form available on the project Web site: http://solareis.anl.gov. EIS-0403-DEIS_EPA_NOA-2011.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact

43

Final DUF6 PEIS: Volume 1: Chapter 4; Assessment Approach and...  

NLE Websites -- All DOE Office Websites (Extended Search)

of people historically exposed to large doses of radiation, such as the Japanese atomic bomb survivors. The factors used for the analysis in this PEIS were 0.0004 LCFperson-rem of...

44

Colorado Department of Public Health and Environment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in Colorado - approximately 25,000 acres - that are leased to private entities for uranium and vanadium mining. No mining operations are active on these lands at this time. DOE is preparing the ULP PEIS to analyze the reasonably foreseeable potential environmental impacts, including the site-specific and cumulative impacts, of a range of selected alternatives for managing the program. The

45

Colorado Department of Public Health and Environment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2013 9, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to July 1, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in Colorado - approximately 25,000 acres - that are leased to private entities for uranium and vanadium mining. No mining operations are active on these lands at this time. DOE is preparing the ULP PEIS to analyze the reasonably foreseeable potential environmental impacts, including the site-specific and cumulative impacts, of a range of selected alternatives for managing the program. The

46

PEIS data report: Upgrading the Y-12 Plant for long-term HEU storage  

SciTech Connect

The Department of Energy (DOE) is planning the future of weapons-capable fissile materials owned by the United States (U.S.). Under its Disposition Program, DOE is evaluating its options for: (a) storage of fissile materials needed for specific national programs, and (b) disposal of surplus fissile materials. In accordance with the National Environmental Policy Act (NEPA), DOE is preparing the {open_quotes}Programmatic Environmental Impact Statement (PEIS) for Long-Term Storage and Disposition of Weapons-Usable Fissile Materials{close_quotes} (Disposition PEIS). This paper discusses storage options for highly enriched uranium at the Y-12 plant.

Everitt, D.A.; Johnson, J.P.; Phillips, J.K.; Snider, J.D.

1996-02-01T23:59:59.000Z

47

File:Geothermal PEIS final.pdf | Open Energy Information  

Open Energy Info (EERE)

PEIS final.pdf PEIS final.pdf Jump to: navigation, search File File history File usage File:Geothermal PEIS final.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1,000 1,001 1,002 1,003 1,004 1,005 1,006 1,007 1,008 1,009 1,010 1,011 1,012 1,013 1,014 1,015 1,016 1,017 1,018 1,019 1,020 1,021 1,022 1,023 1,024 1,025 1,026 1,027 1,028 1,029 1,030 1,031 1,032 1,033 1,034 1,035 1,036 1,037 1,038 1,039 1,040 1,041 1,042 1,043 1,044 1,045 1,046 1,047 1,048 1,049 1,050 1,051 1,052 1,053 1,054 1,055 1,056 1,057 1,058 1,059 1,060 1,061 1,062 1,063 1,064 1,065 1,066 1,067 1,068 1,069 1,070 1,071 1,072 1,073 1,074 1,075 1,076 1,077 1,078 1,079 1,080 1,081 1,082 1,083 1,084 1,085 1,086 1,087 1,088 1,089 1,090 1,091 1,092 1,093 1,094 1,095 1,096 1,097 1,098 1,099 1,100 1,101 1,102 1,103 1,104 1,105 1,106 1,107 1,108 1,109 1,110 1,111 1,112 1,113 1,114 1,115 1,116 1,117 1,118 1,119 1,120 1,121 1,122 1,123 1,124 1,125 1,126 1,127 1,128 1,129 1,130 1,131 1,132 1,133 1,134 1,135 1,136 1,137 1,138 1,139 1,140 1,141 1,142 1,143 1,144 1,145 1,146 1,147 1,148 1,149 1,150 1,151 1,152 1,153 1,154 1,155 1,156 1,157 1,158 1,159 1,160 1,161 1,162 1,163 1,164 1,165 1,166 1,167 1,168 1,169 1,170 1,171 1,172 1,173 1,174 1,175 1,176 1,177 1,178 1,179 1,180 1,181 1,182 1,183 1,184 1,185 1,186 1,187 1,188 1,189 1,190 1,191 1,192 1,193 1,194 1,195 1,196 1,197 1,198 1,199 1,200 1,201 1,202 1,203 1,204 1,205 1,206 1,207 1,208 1,209 1,210 1,211 1,212 1,213 1,214 1,215 1,216 1,217 1,218 1,219 1,220 1,221 1,222 1,223 1,224 1,225 1,226 1,227 1,228 1,229 1,230 1,231 1,232 1,233 1,234 1,235 1,236 1,237 1,238 1,239 1,240 1,241 1,242 1,243 1,244 1,245 1,246 1,247 1,248 1,249 1,250 1,251 1,252 1,253 1,254 1,255 1,256 1,257 1,258 1,259 1,260 1,261 1,262 1,263 1,264 1,265 1,266 1,267 1,268 1,269 1,270 1,271 1,272 1,273 1,274 1,275 1,276 1,277 1,278 1,279 1,280 1,281 1,282 1,283 1,284 1,285 1,286 1,287 1,288 1,289 1,290 1,291 1,292 1,293 1,294 1,295 1,296 1,297 1,298 1,299 1,300 1,301 1,302 1,303 1,304 1,305 1,306 1,307 1,308 1,309 1,310 1,311 1,312 1,313 1,314 1,315 1,316 1,317 1,318 1,319 1,320 1,321 1,322 1,323 1,324 1,325 1,326 1,327 1,328 1,329 1,330 1,331 1,332 1,333 1,334 1,335 1,336 1,337 1,338 1,339 1,340 1,341 1,342 1,343 1,344 1,345 1,346 1,347 1,348 1,349 1,350 1,351 1,352 1,353 1,354 1,355 1,356 1,357 1,358 1,359 1,360 1,361 1,362 1,363 1,364 1,365 1,366 1,367 1,368 1,369 1,370 1,371 1,372 1,373 1,374 1,375 1,376 1,377 1,378 1,379 1,380 1,381 1,382 1,383 1,384 1,385 1,386 1,387 1,388 1,389 1,390 1,391 1,392 1,393 1,394 1,395 1,396 1,397 1,398 1,399 1,400 1,401 1,402 1,403 1,404 1,405 1,406 1,407 1,408 1,409 1,410 1,411 1,412 1,413 1,414 1,415 1,416 1,417 1,418 1,419 1,420 1,421 1,422 1,423 1,424 1,425 1,426 1,427 1,428 1,429 1,430 1,431 1,432 1,433 1,434 1,435 1,436 1,437 1,438 1,439 1,440 1,441 1,442 1,443 1,444 1,445 1,446 1,447 1,448 1,449 1,450 1,451 1,452 1,453 1,454 1,455 1,456 1,457 1,458 1,459 1,460 1,461 1,462 1,463 1,464 1,465 1,466 1,467 1,468 1,469 1,470 1,471 1,472 1,473 1,474 1,475 1,476 1,477 1,478 1,479 1,480 1,481 1,482 1,483 1,484 1,485 1,486 1,487 1,488 1,489 1,490 1,491 1,492 1,493 1,494 1,495 1,496 1,497 1,498 1,499 1,500 1,501 1,502 1,503 1,504 1,505 1,506 1,507 1,508 1,509 1,510 1,511 1,512 1,513 1,514 1,515 1,516 1,517 1,518 1,519 1,520 1,521 1,522 1,523 1,524 1,525 1,526 1,527 1,528 1,529 1,530 1,531 1,532 1,533 1,534 1,535 1,536 1,537 1,538 1,539 1,540 1,541 1,542 1,543 1,544 1,545 1,546 1,547 1,548 1,549 1,550 1,551 1,552 1,553 1,554 1,555 1,556 1,557 1,558 1,559 1,560 1,561 1,562 1,563 1,564 1,565 1,566 1,567 1,568 1,569 1,570 1,571 1,572 1,573 1,574 1,575 1,576 1,577 1,578 1,579 1,580 1,581 1,582 1,583 1,584 1,585 1,586 1,587 1,588 1,589 1,590 1,591 1,592 1,593 1,594 1,595 1,596 1,597 1,598 1,599 1,600 1,601 1,602 1,603 1,604 1,605 1,606 1,607 1,608 1,609 1,610 1,611 1,612 1,613 1,614 1,615 1,616 1,617 1,618 1,619 1,620 1,621 1,622 1,623 1,624 1,625 1,626 1,627 1,628 1,629 1,630 1,631 1,632 1,633 1,634 1,635 1,636 1,637 1,638 1,639 1,640 1,641 1,642 1,643 1,644 1,645 1,646 1,647 1,648 1,649 1,650 1,651 1,652 1,653 1,654 1,655 1,656 1,657 1,658 1,659 1,660 1,661 1,662 1,663 1,664 1,665 1,666 1,667 1,668 1,669 1,670 1,671 1,672 1,673 1,674 1,675 1,676 1,677 1,678 1,679 1,680 1,681 1,682 1,683 1,684 1,685 1,686 1,687 1,688 1,689 1,690 1,691 1,692 1,693 1,694 1,695 1,696 1,697 1,698 1,699 1,700 1,701 1,702 1,703 1,704 1,705 1,706 1,707 1,708 1,709 1,710 1,711 1,712 1,713 1,714 1,715 1,716 1,717 1,718 1,719 1,720 1,721 1,722 1,723 1,724 1,725 1,726 1,727 1,728 1,729 1,730 1,731 1,732 1,733 1,734 1,735 1,736 1,737 1,738 1,739 1,740 1,741 1,742 1,743 1,744 1,745 1,746 1,747 1,748 1,749 1,750 1,751 1,752 1,753 1,754 1,755 1,756 1,757 1,758 1,759 1,760 1,761 1,762 1,763 1,764 1,765 1,766 1,767 1,768 1,769 1,770 1,771 1,772 1,773 1,774 1,775 1,776 1,777 1,778 1,779 1,780 1,781 1,782 1,783 1,784 1,785 1,786 1,787 1,788 1,789 1,790 1,791 1,792 Go!

48

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 East Avenue S o u t h e r n P a c i f i c R . R . A r r o y o S e c o 580 Vasco Road Patterson Pass Road Greenville Road Arroyo Las Positas S o u t h L i v e r m o r e A v e n u e A r r o y o M o c h o 0 Scale: Miles 1 0.5 Springtown Tesla Road A r r o y o La s P o si ta s Sandia National Laboratories Lawrence Livermore National Laboratory 0 1 2 Scale: Kilometers N MLA11861 * * Indicates approximate location of the NIF construction area. FIGURE 3.1 Surface Water Features near Lawrence Livermore National Laboratory 3-7 FIGURE 3.3 Eastern Portion of the Livermore Site Showing Groundwater Wells and Approximate Area Containing VOCs over the Maximum Contaminant Levels in 1998 3-11 MLA6906 PCB (ppm) Tritium (pCi/g) Freon 11 (ppb) Carbon tetrachloride (ppb) PCE (ppb) TCE (ppb) 1x10 -1 1x10 0 1x10 1 1x10 2 1x10 3 1x10 4 1x10 5 18 0.53 520 23 1,600 6,100 540 EPA Industrial PRG

49

Draft General Conformity Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Draft General Conformity Determination U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix I Draft General Conformity Determination Draft General Conformity Determination Cape Wind Energy Project Prepared by Minerals Management Service Herndon, VA November 2008 i TABLE OF CONTENTS 1.0 INTRODUCTION TO THE PROPOSED ACTION............................................................... 1 2.0 GENERAL CONFORMITY REGULATORY BACKGROUND .......................................... 2 2.1 GENERAL CONFORMITY REQUIREMENTS.................................................................... 2 2.2 GENERAL CONFORMITY APPLICABILITY.....................................................................

50

Lincoln Electric Draft Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX E. DRAFT EA COMMENTS AND RESPONSES 2 Lincoln Electric Draft Environmental Assessment Comments and Responses Number Commenter Comment Summary Response 1. Euclid Historical...

51

DRAFT Glossary of AFIS Terms  

Science Conference Proceedings (OSTI)

Page 1. DRAFT Glossary of AFIS Terms Latent Print AFIS Interoperability Working Group Page 2. DRAFT Glossary of AFIS Terms 2 ...

2012-05-04T23:59:59.000Z

52

Preliminary Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

53

Design and Drafting  

NLE Websites -- All DOE Office Websites (Extended Search)

Prototyping -- Desktop 3D Printing The Design & Drafting Group has an Objet30 Pro 3D printer that provides the accuracy and versatility of a high-end rapid prototyping machine...

54

NIST Cybersecurity Framework - DRAFT Framework Glossary  

Science Conference Proceedings (OSTI)

DRAFT - Framework Glossary Term Draft Definition Category The logical subdivision of a function; one or more categories comprise a function. ...

2013-06-28T23:59:59.000Z

55

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

091 - 22100 of 26,764 results. 091 - 22100 of 26,764 results. Article Public Comment Period Re-Opened for the Uranium Leasing Program PEIS The U.S. Department of Energy is re-opening the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS, DOE/EIS-0472) until July 1, 2013. http://energy.gov/nepa/articles/public-comment-period-re-opened-uranium-leasing-program-peis Download Independent Specific Administrative Controls Review, Office of River Protection- December 2010 Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection http://energy.gov/hss/downloads/independent-specific-administrative-controls-review-office-river-protection-december Download Facility Survey & Transfer

56

The PEIS  

NLE Websites -- All DOE Office Websites (Extended Search)

evaluating the alternative strategies for long-term management and use of the depleted uranium hexafluoride in storage for several years. These studies included the preparation of...

57

NIST Computer Security Publications - Drafts  

Science Conference Proceedings (OSTI)

... 1. DRAFT Guidelines for Smart Grid Cybersecurity: Vol. 1 - Smart Grid Cybersecurity Strategy, Architecture, and High-Level Requirements Vol. ...

58

Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

59

Draft Enivonmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

60

Fluid bed adsorption of carbon dioxide on immobilized polyethyenimine (PEI): kinetic analysis and breakthrough behavior  

Science Conference Proceedings (OSTI)

The adsorption of carbon dioxide (CO{sub 2}) by immobilized polyethylenimine (PEI) on mesoporous silica was investigated in a fluid bed. The tests were performed to determine breakthrough behavior with varying bed temperature, flow rates and feed concentrations. Experimental breakthrough curves were analyzed using a theoretical 1D model developed by Bohart and Adams. The results showed that Bohart-Adams model was suitable for the normal description of breakthrough curve for the temperature ranges of 40-90{degree}C. The maximum capacity increased with temperature up to 70{degree}C and then decreased. The adsorption rate constant exhibited a negative temperature dependence decreasing as the temperature increased. Parameters characteristic of a fluid bed adsorber were inferred from these breakthrough curves including the breakthrough time, saturation time, critical reactor length, and length of mass transfer zone LMTZ. These parameters can be used to design fluid bed adsorption system without resolving the mechanistic contributions of dispersion, mixing, and intraparticle diffusion.

Monazam, Esmail R.; Spenik,, James; Shadle, Lawrence J.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Dampers for Natural Draft Heaters: Technical Report  

E-Print Network (OSTI)

vented natural-draft gas-fired storage water heater. Thevented natural?draft gas?fired storage water heater. Thevented natural?draft gas?fired storage water heater. The

Lutz, James D.

2009-01-01T23:59:59.000Z

62

DUF6 Draft EIS Public Hearing Transcripts  

NLE Websites -- All DOE Office Websites (Extended Search)

Depleted UF6 Draft EIS Public Hearing Transcripts Transcripts from the DUF6 Conversion Draft EIS Public Hearings The following transcripts are from the DUF6 Conversion...

63

Draft Advanced Fossil Solicitation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Fossil Solicitation Federal loan guarantee solicitation announcement -- Advanced Fossil Energy Projects. Microsoft Word - Draft Advanced Fossil Solicitation Final Draft.1...

64

Design and Drafting  

NLE Websites -- All DOE Office Websites (Extended Search)

Email Portal (Zimbra)* Email Portal (Zimbra)* * Operations Logbook* * Project Proposal System* * ICMS * Safety and Training * ANL ESQ Training * APS Phone Directory * Resources & Information* * Internal link Design and Drafting Group The Advanced Photon Source (APS) at Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The AES Design and Drafting Group supports the ASD and AES divisions' continued improvement of the accelerator as well as the scientific

65

Draft Genome Sequence  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Draft Genome Sequence of Serratia sp. Strain ATCC 39006, a Model Bacterium for Analysis of the Biosynthesis and Regulation of Prodigiosin, a Carbapenem, and Gas Vesicles Peter C. Fineran, a Marina C. Iglesias Cans, a Joshua P. Ramsay, b Nabil M. Wilf, b Desiree Cossyleon, a Matthew B. McNeil, a Neil R. Williamson, b Rita E. Monson, b S. Anette Becher, c Jo-Ann L. Stanton, d Kim Brügger, e Steven D. Brown, f George P. C. Salmond b Department of Microbiology and Immunology, University of Otago, Dunedin, New Zealand a ; Department of Biochemistry, University of Cambridge, Cambridge, United Kingdom b ; AgResearch Ltd., Invermay Agricultural Centre, Mosgiel, New Zealand c ; Department of Anatomy, University of Otago, Dunedin, New Zealand d ; EASIH, University of Cambridge, Addenbrooke's Hospital, Cambridge, United Kingdom e ; Biosciences Division, Oak Ridge National Laboratory, Oak Ridge,

66

Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering & Services; COGEMA, Inc.; and Stone & Webster (known as DCS) to provide the requested services. The procurement process included the environmental review specified in DOE's NEPA regulations in 10 CFR 1021.216. The six reactors selected are Catawba Nuclear Station Units 1 and 2 in South Carolina McGuire Nuclear Station Units 1 and 2 in North Carolina, and North Anna Power Station Units 1 and 2 in Virginia. The Supplement describes the potential environmental impacts of using MOX fuel in these six specific reactors named in the DCS proposal as well as other program changes made since the SPD Draft EIS was published.

N /A

1999-05-14T23:59:59.000Z

67

STAFF DRAFT GUIDEBOOK RENEWABLES PORTFOLIO  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT POWER SOURCE DISCLOSURE PROGRAM PRERULEMAKING DRAFT REGULATIONS SECOND DRAFT APRIL 2011 CEC3002011003SD #12;CALIFORNIA ENERGY COMMISSION Lorraine Gonzalez Staff members of the California Energy Commission prepared this report. As such, it does not necessarily

68

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 23090 of 26,764 results. 81 - 23090 of 26,764 results. Article DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013. http://energy.gov/nepa/articles/doe-extends-public-comment-period-draft-uranium-leasing-program-programmatic Article V-146: HP Service Manager Bugs Permit Cross-Site Scripting and Information Disclosure Attacks Two vulnerabilities were reported in HP Service Manager http://energy.gov/cio/articles/v-146-hp-service-manager-bugs-permit-cross-site-scripting-and-information-disclosure Download Enforcement Letter, National Security Technologies, LLC- May 21,

69

EXCESS OXYGEN DEFECTS IN LAYERED CUPRATES P. Lightfoot, S.-Y. Pei, J. D. Jorgensen  

NLE Websites -- All DOE Office Websites (Extended Search)

EXCESS OXYGEN DEFECTS IN LAYERED CUPRATES EXCESS OXYGEN DEFECTS IN LAYERED CUPRATES P. Lightfoot, S.-Y. Pei, J. D. Jorgensen Materials Science Division Argonne National Laboratory Argonne,IL 60439 and A. Manthiram and J. B. Goodenough Center for Materials Science and Engineering University of Texas at Austin Austin, TX 78712 CONF-900813-1 DE90 017669 C g 3 3 * o f E , < * > 3' 5' S B O ? c 8 5 o q ft 8 a 2, o o The submitted manuscript has been authored by a contractor of the U.S. Government under contract No. W - 3 M 0 9 - E N G - 3 8 . Accordingly, the U.S. Government retains a nonexclusive, royalty-lrea license to publish or reproduce the published form of this contribution, or allow others to do so, for U.S. Government purposes. ° 8 c (tm) 8.= M 8 S g-« I. 2,-, 9 ^ n - i f s £ : 6. " c < B o September 1990 3 5- 8 " ^ B _

70

HSS Work Group Telecom (Draft Charters) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting SummaryActionsParticipants Draft Proposed Charter Template Draft Work Group Matrix Draft Work Group Guidance More Documents & Publications HSS Focus Group Meeting...

71

Design and Drafting  

NLE Websites -- All DOE Office Websites (Extended Search)

Design & Drafting Work Request Form Design & Drafting Work Request Form Please complete and submit the following form to request service from the AES/D&D Group Please fill out this form as complete as possible. Please do not use any special characters such as / or \ use a dash -. Project Name: Project Division is for: AES ASD XSD BEAMLINE APS APS-Upgrade LCLS NSLS-II Specify the APS Division the Project will be built for. WBS: Requesting Engineer: Last Name First Name Requesters Badge Number: Requesters Phone: E-mail: @aps.anl.gov Requesters Group: AES-ADM AES-BC AES-BSC AES-CF AES-CS AES-CTL AES-DD AES-IS AES-IT AES-MED AES-MIS AES-MOM AES-PRO AES-SA AES-SI AES-UES ASD-ADM ASD-AP ASD-DIA ASD-IAG ASD-MD ASD-OA ASD-PS ASD-RF LCLS USR-APS XSD-ADM XSD-BTS XSD-CEP XSD-IXN XSD-MC XSD-MM XSD-OFM XSD-TRR XSD-UAS XSD-XMI XSD-XOR

72

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

73

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

74

Final Plan for the Conversion of DUF6  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride (Draft PEIS) 1 . The Draft PEIS and...

75

Framework Draft for Networked Appliances using  

E-Print Network (OSTI)

Internet-Drafts are working documents of the Internet Engineering Task Force (IETF), its areas, and its working groups. Note that other groups may also distribute working documents as Internet-Drafts. Internet-Drafts are draft documents valid for a maximum of six months and may be updated, replaced, or obsoleted by other documents at any time. It is inappropriate to use Internet-Drafts as reference material or to cite them other than as "work in progress." The list of current Internet-Drafts can be accessed at

S. Moyer; D. Marples; S. Tsang; J. Katz; P. Gurung; T. Cheng; A. Dutta; H. Schulzrinne

2001-01-01T23:59:59.000Z

76

Environmental Impact Statements; Notice of Availability; FutureGen Final EIS; Draft PEIS for Designation of Energy Corridors in Eleven Western States (11/16/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

618 Federal Register 618 Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices Corridor Improvement Project, Proposed Roadway Improvements on Route 101 between the Eureka Slough Bridge and 11th St. Overcrossing in Arcata, Humbolt County, CA. Summary: EPA expressed environmental concerns about impacts to air quality and noise. EPA encourages continued interagency coordination to mitigate impacts to wetlands and cumulative impacts. Rating EC2. EIS No. 20070323, ERP No. D-FHW- J40177-CO, US-36 Corridor, Multi- Modal Transportation Improvements between I-25 in Adams County and Foothills Parkway/Table Mesa Drive in Boulder, Adams, Denver, Broomfield, Boulder and Jefferson Counties, CO. Summary: EPA expressed environmental concerns about the wetlands impacts and impacts to the

77

San Luis Rio Colorado Project Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft EIS Draft EIS i CONTENTS Acronyms and Abbreviations ........................................................................................................ xi S Summary ................................................................................................................................. I S.1 Purpose and Need for Agency Action ............................................................................II S.2 Applicants' Purpose and Goals..................................................................................... III S.3 Public Participation....................................................................................................... IV S.4 Alternatives ................................................................................................................

78

DRAFT Outline - Preliminary Framework to Reduce Cyber ...  

Science Conference Proceedings (OSTI)

Page 1. 1 DRAFT Outline - Preliminary Framework to Reduce Cyber Risks to Critical Infrastructure, July 1, 2013 NOTES ...

2013-07-02T23:59:59.000Z

79

Renewable Energy Annual DRAFT - Energy Information Administration  

U.S. Energy Information Administration (EIA)

and for biofuel production. DRAFT. EIA-22M, Monthly Biodiesel Production Survey Page 7 Permanently Ceased Operations (operating status): ...

80

LM News Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM News Archive LM News Archive LM News Archive RSS October 28, 2013 DOE Releases Biological Monitoring and Sampling Results Report for the Amchitka, Alaska, Site The U.S. Department of Energy today announced the availability of the Amchitka Island, Alaska, Biological Monitoring Report 2011 Sampling Results for the Amchitka, Alaska, site. The report provides the results of terrestrial and marine sampling in the areas surrounding Amchitka and Adak Islands in 2011. June 3, 2013 DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement The U.S. Department of Energy (DOE) has extended the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) to July 1, 2013. April 18, 2013

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

News News News News October 28, 2013 DOE Releases Biological Monitoring and Sampling Results Report for the Amchitka, Alaska, Site The U.S. Department of Energy today announced the availability of the Amchitka Island, Alaska, Biological Monitoring Report 2011 Sampling Results for the Amchitka, Alaska, site. June 3, 2013 DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement The U.S. Department of Energy (DOE) has extended the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) to July 1, 2013. April 18, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment

82

News | Department of Energy  

Office of Legacy Management (LM)

Us » News Us » News News News October 28, 2013 DOE Releases Biological Monitoring and Sampling Results Report for the Amchitka, Alaska, Site The U.S. Department of Energy today announced the availability of the Amchitka Island, Alaska, Biological Monitoring Report 2011 Sampling Results for the Amchitka, Alaska, site. June 3, 2013 DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement The U.S. Department of Energy (DOE) has extended the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) to July 1, 2013. April 18, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment

83

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 26, 2013 March 26, 2013 The Energy Department is supporting new research and development projects that focus on reducing energy use and costs for U.S. manufacturers. One project is expected to dramatically reduce the cost and lower the energy needed to produce aircrafts. | Photo courtesy of ARM Climate Research Facility. New Investment in Energy-Efficient Manufacturing Five new R&D projects will focus on reducing energy use and costs for U.S. manufacturers while helping to boost product output and improve companies' bottom lines. March 15, 2013 Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment DOE has issued the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)(DOE/EIS-0472D) for public review and comment.

84

DOE Issues Two Draft National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations U.S....

85

EA-1886: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1886: Draft Environmental Assessment Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project, Shelby,...

86

EIS-0323-S1: Draft Supplement Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: Draft Supplement Environmental Impact Statement EIS-0323-S1: Draft Supplement Environmental Impact Statement Sacramento Area Voltage Support Construction and operation has...

87

UNEP Handbook for Drafting Laws on Energy Efficiency and Renewable...  

Open Energy Info (EERE)

Handbook for Drafting Laws on Energy Efficiency and Renewable Energy Resources Jump to: navigation, search Name UNEP Handbook for Drafting Laws on Energy Efficiency and Renewable...

88

EA-1932: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

89

EIS-0312: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

90

EIS-0271: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

91

EA-1917: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable...

92

Draft Chapter 3: Demand-Side Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Chapter 3: Demand-Side Resources Draft Chapter 3: Demand-Side Resources Utilities in many states have been implementing energy efficiency and load management programs...

93

EIS-0379: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section...

94

EA-1903: Notice of Availability of Draft Environmental Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Availability of Draft Environmental Assessment EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project,...

95

EIS-0464: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture...

96

EIS-0355: EPA Notification of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the...

97

EIS-0391: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement Tank Closure and Waste...

98

EIS-0445: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0445: EPA Notice of Availability of the Draft Environmental Impact Statement Mountaineer Commercial Scale...

99

EIS-0373: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0373: EPA Notice of Availability of the Draft Environmental Impact Statement Proposed Consolidation...

100

EIS-0375: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0408: EPA Notice of Availability of a Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Upper...

102

EIS-0409: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Draft Environmental Impact Statement Kemper County Integrated...

103

EIS-0336: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and...

104

EA-1566: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Assessment EA-1566: DOE Notice of Availability of the Draft Environmental Assessment Proposed Infrastructure Improvements for...

105

EIS-0394: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen Project...

106

EA-1917: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces...

107

EA-1339: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: DOE Notice of Availability of the Draft Environmental Assessment Addendum EA-1339: DOE Notice of Availability of the Draft Environmental Assessment Addendum Disposition of...

108

EIS-0374: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Draft Environmental Impact Statement Klondike IIIBiglow Canyon...

109

EA-1809: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Environmental Assessment EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen...

110

EIS-0441: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0441: EPA Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm Project,...

111

EIS-0478: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0478: EPA Notice of Availability of a Draft Environmental Impact Statement Antelope Valley Station to...

112

EIS-0451: EPA Notice of Availability of a Draft Environmental...  

NLE Websites -- All DOE Office Websites (Extended Search)

51: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0451: EPA Notice of Availability of a Draft Environmental Impact Statement Hooper Springs Project,...

113

EIS-0346: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project,...

114

EIS-0387: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement Y-12 National Security...

115

EIS-0317: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement...

116

EIS-0422: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower...

117

EIS-0431: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's...

118

EIS-0472: EPA Notice of Availability of a Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement...

119

EA-1790: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Assessment EA-1790: DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc,...

120

EIS-0385: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EIS-0399: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd....

122

EIS-0353: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout...

123

EIS-0441: Amended Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Availability of a Draft Environmental Impact Statement EIS-0441: Amended Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm...

124

EIS-0444: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0444: EPA Notice of Availability of the Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of...

125

EIS-0361: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project...

126

EA-1656: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Assessment EA-1656: DOE Notice of Availability of the Draft Environmental Assessment MARET Center Construction Project at...

127

EIS-0409: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

409: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Draft Environmental Impact Statement Kemper County...

128

EA-1929: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1929: Notice of Availability of a Draft Environmental Assessment NorthStar Medical Technologies LLC, Commercial...

129

EA-1919: Notice of Availability of a Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating...

130

EA-1922: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a Draft Environmental Assessment Combined Power and Biomass Heating System, Fort...

131

EIS-0394: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen Project Planning,...

132

EIS-0419: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact Statement Whistling Ridge Energy...

133

EA-1592: GSA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GSA Notice of Availability of the Draft Environmental Assessment EA-1592: GSA Notice of Availability of the Draft Environmental Assessment Modernization of Facilities and...

134

EA-1900: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1900: Notice of Availability of a Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory...

135

EIS-0469: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement EPA Notice of Availability...

136

EIS-0359: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0359: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation...

137

EIS-0431: DOE Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of Draft Environmental Impact Statement EIS-0431: DOE Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's...

138

EIS-0444: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0444: DOE Notice of Availability of the Draft Environmental Impact Statement...

139

EIS-0250: EPA Notice of Availability of the Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement...

140

EIS-0472: DOE Notice of Availability of a Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0400: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard...

142

EIS-0408: DOE Notice of Availability of a Programmatic Draft...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE...

143

EIS-0421: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct,...

144

EIS-0414: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Environmental Impact Statement EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project,...

145

EIS-0447: DOE Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to...

146

New Draft of Cybersecurity Risk Management Process (RMP) Guideline...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now...

147

Systems/Component Design, Engineering and Drafting - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Drafting Capabilities Engineering Computation and Design Engineering and Structural Mechanics SystemsComponent Design, Engineering and Drafting Heat Transfer and Fluid Mechanics...

148

EIS-0350: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

149

EIS-0447: EPA Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to...

150

EIS-0365: Draft Environmental Impact Statement for the Imperial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) EIS-0365: Draft Environmental Impact Statement for the...

151

DRAFT NEPA Guidance on Consideration of the Effects of Climate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and...

152

DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of this document is to seed...

153

EIS-0458: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0458: Draft Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis...

154

EIS-0403: EPA Notice of Availability of the Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Notice of Availability, Draft...

155

EA-1922: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1922: Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska This DOE Draft EA, in cooperation with RUS and the...

156

EA-1861: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to...

157

EIS-0283: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0283: Draft Environmental Impact Statement Surplus Plutonium Disposition Draft Environmental Impact Statement This EIS evaluates the potential...

158

EA-1904: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the environmental...

159

DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas...

160

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0250: Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain(July 1999)

162

Berkeley Lab's "Draft" Sustainability Strategy (Title TBD)  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab's "Draft" Sustainability Strategy (Title TBD) NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be updated until...

163

DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report: Revision 2 DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee Report: Revision 2 Energy storage plays a vital role in all forms of business and affects the...

164

The Draft of ASME PTC 19  

NLE Websites -- All DOE Office Websites (Extended Search)

Generators for each of the Gas Turbines and Steam Turbine. * A steam surface condenser with mechanical vacuum pumps for air removal and a mechanical draft cooling tower...

165

Appendix D Draft Oil Spill Response Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D Draft Oil Spill Response Plan U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix D Draft Oil Spill Response Plan DRAFT Oil Spill Response Plan CAPE WIND ASSOCIATES, LLC BOSTON, MASSACHUSETTS PREPARED FOR Cape Wind Associates, LLC 75 Arlington Street Boston, Massachusetts 02116 PREPARED BY ESS Group, Inc. 401 Wampanoag Trail, Suite 400 East Providence, Rhode Island 02915 Project No. E159-601 December 2005 DRAFT OIL SPILL RESPONSE PLAN Cape Wind Associates, LLC Boston, Massachusetts Prepared For: Cape Wind Associates, LLC 75 Arlington Street Boston, Massachusetts 02116 Prepared By: ESS Group, Inc. 401 Wampanoag Trail, Suite 400

166

Draft Report of Policy Subcommittee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Energy Advisory Committee Nuclear Energy Advisory Committee Draft Report of Policy Subcommittee September, 2008 1 DRAFT ONLY; NOT FOR CITATION OR DISTRIBUTION WITHOUT PERMISSION I. Introduction More than 50 years since the launch of the Atoms for Peace initiative, the implications of US nuclear policy, in terms of our Nation's energy, environmental, and national security interests, are greater than ever. The choices the next president will make regarding nuclear energy will therefore be of the utmost importance. The mission of this Subcommittee is to explore the critical choices and implications in US nuclear energy policy, with a view to framing options for the next President to consider. Nuclear energy is just one element of the broader energy picture. One cannot effectively address

167

Chapter 3_Consolidated_DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement March 2013 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Volume 1: Environmental Analyses DOE/EIS-0451 HOOPER SPRINGS TRANSMISSION PROJECT Draft Environmental Impact Statement DOE/EIS - 0451 Bonneville Power Administration Cooperating Agencies U.S. Department of Agriculture, Forest Service, Caribou-Targhee National Forest U.S. Department of Interior, Bureau of Land Management Idaho Office of Energy Resources March 2013 Hooper Springs Transmission Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agencies: U.S. Department of Agriculture, Forest Service (USFS), Caribou-Targhee National Forest (C-TNF); U.S. Department of Interior, Bureau of Land Management (BLM); Idaho Office of Energy Resources

168

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

169

DRAFT FOR PUBLIC COMMENT STATE OF CALIFORNIA  

E-Print Network (OSTI)

populations. It also provides recommendations for consideration by state agencies related to extreme heatDRAFT FOR PUBLIC COMMENT STATE OF CALIFORNIA EXTREME HEAT ADAPTATION INTERIM GUIDANCE DOCUMENT (CAT) 8/31/2012 #12;DRAFT FOR PUBLIC COMMENT Page 1 STATE OF CALIFORNIA EXTREME HEAT ADAPTATION

170

Draft Forecast of Electricity Demand for the 5th  

E-Print Network (OSTI)

products has been below the medium-low. Future natural gas prices are expected to be higher in this power's draft natural gas price forecasts. The medium natural gas price forecast for this plan in 2015 is about Council Document 2001-23, sited above. #12;DRAFT DRAFT DRAFT 11 Table 1 Natural Gas Price Forecasts

171

Program Updates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

News » Program Updates News » Program Updates Program Updates January 7, 2014 Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS; Groundwater Remedy Is Evaluated at the Mound, Ohio, Site; Visitors Learn About the History of LM's Unique Facility in Puerto Rico; German Remediation Offi cials Benchmarking Visit; International Atomic Energy Agency Accepts Consultation from LM; Environmental Justice Activities; and more. October 21, 2013 Program Update: 3rd Quarter 2013 Inside this Update: Legacy Management Work Progresses on Defense-Related Uranium Mines Report to Congress; Weaving Community and Science; LM Completes Construction of Well Pad at CNTA; DOE Salute - Grand Junction,

172

DOE Evaluates Environmental Impacts of Uranium Mining on Government Land in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluates Environmental Impacts of Uranium Mining on Government Evaluates Environmental Impacts of Uranium Mining on Government Land in Western Colorado DOE Evaluates Environmental Impacts of Uranium Mining on Government Land in Western Colorado March 15, 2013 - 12:20pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov GRAND JUNCTION, Colo. - The U.S. Department of Energy (DOE) today announced that the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) is available for public review and comment. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in Colorado - approximately 25,000 acres - that are leased to private entities for uranium and vanadium mining. No mining operations are active

173

DOE Extends Public Comment Period for Uranium Program Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Program Environmental Uranium Program Environmental Impact Statement DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement April 18, 2013 - 1:08pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov GRAND JUNCTION, Colo. - The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in Colorado - approximately 25,000 acres - that are leased to private entities for uranium and vanadium mining. No mining operations are active

174

Program Update: 4th Quarter 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Program Update: 4th Quarter 2013 Program Update: 4th Quarter 2013 Inside this Update: Agencies Assist LM to Develop Reports on Defense-Related Uranium Mines; DOE Responds to Public Input on the Draft ULP PEIS; Groundwater Remedy Is Evaluated at the Mound, Ohio, Site; Visitors Learn About the History of LM's Unique Facility in Puerto Rico; German Remediation Offi cials Benchmarking Visit; International Atomic Energy Agency Accepts Consultation from LM; Environmental Justice Activities; and more. The Program Update newsletter is produced every quarter and highlights major activities and events that occurred across the DOE complex during that period of time Office of Legacy Management (LM) Program Update, October-December 2013 More Documents & Publications

175

Business Plan in Brief : Draft.  

SciTech Connect

Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

United States. Bonneville Power Administration.

1994-06-01T23:59:59.000Z

176

DOE/EA-1697 Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment for Right-of-Way Maintenance in the San Joaquin Valley, California June 2010 Prepared for: Western Area Power Administration, Sierra Nevada Region San Joaquin Valley ROW Maintenance EA June 2010 iii Draft EA CONTENTS 1.0 PURPOSE AND NEED FOR ACTION ...................................................................... 1-1 1.1 Introduction ............................................................................................. 1-1 1.2 Background ............................................................................................. 1-1 1.3 Purpose and Need for Action .................................................................. 1-3 1.4 Location and Project Area Description .................................................... 1-4

177

Property:Draft (m) | Open Energy Information  

Open Energy Info (EERE)

Draft (m) Draft (m) Jump to: navigation, search Property Name Draft (m) Property Type String Pages using the property "Draft (m)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/Aegir Dynamo + 8 + MHK Technologies/Deep Green + 40 + MHK Technologies/Deep water capable hydrokinetic turbine + 5 + MHK Technologies/Electric Buoy + 7 + MHK Technologies/European Pico Pilot Plant + 7 + MHK Technologies/Evopod E35 + 5 + MHK Technologies/Float Wave Electric Power Station + 7 + MHK Technologies/Floating anchored OTEC plant + 530 + MHK Technologies/HyPEG + 20 + MHK Technologies/HydroGen 10 + 1 + MHK Technologies/Hydroflo + 2 + MHK Technologies/ITRI WEC + 13 + MHK Technologies/Microturbine River In Stream + 0.7 + MHK Technologies/OCEANTEC Wave Energy Converter + 5.25 +

178

Electric Motor Predictive Maintenance: Draft Guidelines  

Science Conference Proceedings (OSTI)

Predictive Maintenance can enhance the early detection and avoidance of incipient equipment failures in electric motors. This report provides draft guidelines to support the development of electric motor predictive maintenance (EMPM) programs at utility sites.

1997-10-16T23:59:59.000Z

179

CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAMERON LIQUEFACTION PROJECT CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................... ES-1 PROPOSED ACTION ............................................................................................................... ES-1 PUBLIC INVOLVEMENT ....................................................................................................... ES-3 PROJECT IMPACTS ................................................................................................................ ES-3 ALTERNATIVES CONSIDERED ........................................................................................... ES-7 CONCLUSIONS ....................................................................................................................... ES-8

180

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

on eligibility of hydroelectric and fuel cell facilities, respectively). The Energy Commission recognizesCalifornia Energy Commission STAFF REPORT RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Draft Staff Guidebook Fourth Edition AUGUST 2010 CEC3002010007SD #12;CALIFORNIA ENERGY COMMISSION Kate Zocchetti

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity) ................................................................ 19 Supply Form S2: Energy Balance Table ...................... California Energy Commission DRAFT STAFF REPORT FORMS AND INSTRUCTIONS FOR SUBMITTING

182

Appendix A DRAFT EIS DISTRIBUTION LIST  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A A DRAFT EIS DISTRIBUTION LIST A-1 ADMINISTRATIVE DRAFT EIS DISTRIBUTION LIST Federal Agencies Air Force Real Property Agency, TX Jeffrey Blevins Army Corps of Engineers Office of the Chief of Army Engineers, DC John Furry, Senior Policy Advisor New Orleans District, LA James Little Ronnie Duke, Western Division Manager Army Operations Division, VA Office of the Assistant Chief of Staff for Installation Management

183

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DSM programs DSM programs between 1989 and 1999, an average of $1.3 billion per year. 1 Interest in these programs gradually grew in the 1980s and early 1990s, then went through a "hiccup" in the mid- 1990s as many states and utilities cut back on their demand-side efforts in order to prepare for electric industry restructuring. Growth resumed in the late 1990s when many states decided not to restructure. Also, even many restructured states decided that demand-side programs were important and created mechanisms to fund and provide such programs, most notably "public benefits" programs, which in many cases are administered and implemented by non-utility organizations. Since the turn-of-the-century, investments in demand-side resources have steadily

184

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

demand-side demand-side programs between 1989 and 1999, an average of $1.3 billion per year. 1 Interest in these programs gradually grew in the 1980s and early 1990s, then went through a "hiccup" in the mid-1990s as many states and utilities cut back on their demand-side efforts in order to prepare for electric industry restructuring. Growth resumed in the late 1990s when many states decided not to restructure. Also, even many restructured states decided that demand-side programs were important and created mechanisms to fund and provide such programs, most notably "public benefits" programs, which in many cases are administered and implemented by non-utility organizations. Since the turn-of-the-century, investments in demand-side resources have steadily

185

Draft  

E-Print Network (OSTI)

Grenadiers are presently considered unspecified by the NPFMC, which means they are not a part of the groundfish management plans for either the Gulf of Alaska (GOA) or the Bering Sea/Aleutian Islands (BSAI). Therefore, there are no limitations on catch or retention, no reporting requirements, and no official tracking of grenadier catch by management. However, a proposed joint management plan amendment for other species may change grenadiers to a specified status, in which case they would be included as managed groundfish species in the plans. In response to this possibility, an assessment of grenadiers in Alaska was prepared for the first time as an appendix to the 2006 SAFE report (Clausen 2006). For the 2007 SAFE report, it was decided that for many of the other species reports and also for unspecified fish such as grenadiers, a full assessment was not necessary, and that an Executive Summary would suffice. Of the seven species of grenadiers known to occur in Alaska, the giant grenadier appears to be most abundant and also has the shallowest depth distribution on the continental slope. As a result, it is by far the most common grenadier caught in the commercial fishery and in fish surveys. Therefore, the grenadier assessment focuses on giant grenadier. Because of a lack of information on the population dynamics of giant grenadier, this species could be classified into

M. Clausen

2007-01-01T23:59:59.000Z

186

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2005, 11:00 a.m.-12:30 p.m. EST 8, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Ray English (Office of Naval Reactors, DOE), Scott Field (Western Interstate Energy Board [WIEB]), Bob Fronczak (Association of American Railroads), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Bill Mackie (Western Governors' Association), Roger Mulder (Texas Energy Conservation Office), Ellen Ott (DOE General Counsel), Tammy Ottmer (WIEB-Colorado), Jim Reed (NCSL), Tim Runyon (Illinois Department of Nuclear Safety), Conrad Smith (CSG-East), Ruth Weiner (Sandia National Laboratories) Contractor Support: Ralph Best (BSC), Peter Bolton (BAH)Randy Coppage (BAH),

187

draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 (08-93) U.S. Department of Energy ORDER FOR SUPPLIES OR SERVICES ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMPORTANT: Mark all packages and papers with contract and/or order numbers. 1. DATE OF ORDER 2. CONTRACT NO. (if any) 3. ORDER NO. 4. REQUISITION/REFERENCE NO. 5. ISSUING OFFICE (Address correspondence to) BUYER NO. CODE 6. SHIP TO: (Consignee and address, ZIP Code) SHIP VIA: 7. TO CONTRACTOR (Name, address and ZIP Code) 8. TYPE OF ORDER 9 9 A. PURCHASE - Reference your___________________________ ____________________________________________________________ Please furnish the following on the terms and conditions specified on both sides for this order and on the attached sheets, if any,

188

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wednesday, November 9, 2005, 11:00 a.m.-12:00 p.m. EST Wednesday, November 9, 2005, 11:00 a.m.-12:00 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW) Members: Kevin Blackwell (DOT/FRA), Pat Brady (BNSF), Anne Clark (WGA), Doug Osborn (Sandia National Laboratories), Ellen Ott (DOE General Counsel), Tim Runyon (CSG-MW),Lisa Sattler (CSG-Midwest), Ruth Weiner (Sandia National Laboratories), Sarah Wochos (CSG-MW) Contractor Support: Ralph Best (BSC), Michele Enders (SAIC), and John Smegal (LEGIN) Summary: The conference call began at 11:00 a.m. Eastern time on Wednesday, November 9, 2005. Jay Jones started the meeting by reviewing the items to be discussed during the call. Jay announced that Alex Thrower just sent out the Security Topic Group (STG) Task Plan. The STG's Task Plan overlaps with the RTG's Task Plan and there may need to be a

189

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DSM programs DSM programs between 1989 and 1999, an average of $1.3 billion per year. 1 Interest in these programs gradually grew in the 1980s and early 1990s, then went through a "hiccup" in the mid- 1990s as many states and utilities cut back on their demand-side efforts in order to prepare for electric industry restructuring. Growth resumed in the late 1990s when many states decided not to restructure. Also, even many restructured states decided that demand-side programs were important and created mechanisms to fund and provide such programs, most notably "public benefits" programs, which in many cases are administered and implemented by non-utility organizations. Since the turn-of-the-century, investments in demand-side resources have steadily

190

-DRAFT-  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/NETL's Mercury Control Technology DOE/NETL's Mercury Control Technology R&D Program for Coal-Fired Power Plants Thomas J. Feeley, III 1. , James Murphy 2. , Jeffrey Hoffmann 2. , and Scott A. Renninger 1. 1. U.S. Department of Energy, National Energy Technology Laboratory 2. Science Applications International Corporation Abstract Mercury exists in trace amounts in coal. In the United States, coal-fired power plants emit about 48 tons of mercury and are the largest point source of emissions. The U.S. Environmental Protection Agency has determined the need to control mercury emissions from power plants. In addition, several legislative proposals have been introduced in the 108 th Congress to reduce mercury emissions from the electric-utility sector. Recognizing the potential for mercury regulations, the U.S. Department of Energy/National

191

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 0, 2012 Roland Risser, Director Building Technologies Program U.S. Department of Energy Mail Stop EE-2J 1000 Independence Ave, SW Washington, DC 20585 Subject: Joint Hydraulic Institute/ASAP Letter of March 30 th - Clarification of Point #2 Dear Mr. Risser, We are looking forward to our meeting with you and your staff on May 1 st to present our progress regarding potential energy conservation standards for certain types of pumps. We would like to clarify point #2 in the referenced letter, which addressed potential energy conservation standards for residential circulators. During the joint meeting between Hydraulic Institute and efficiency advocates, we agreed to investigate paths for consideration, and did not specifically agree on a recommended standard

192

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2005, 11:00 a.m.-12:00 p.m. EST September 15, 2005, 11:00 a.m.-12:00 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Patrick Brady (BNSF), Sandi Covi (Union Pacific), Scott Field (WIEB-CO), Bob Fronczak (AAR), Eric Huang (DOE Office of Transportation), Paul Johnson (ORNL), Adam Levin (Exelon Generation), Bill Mackie (Western Governors' Association), Ken Niles (WIEB), Doug Osborn (Sandia National Laboratories), Ellen Ott (DOE General Counsel), Lisa Sattler (CSG-Midwest),Conrad Smith (CSG-East), Sarah Wochos (CSG-MW) Contractor Support: Randy Coppage (BAH), Michele Enders (SAIC), Lee Finewood (BAH), and Ron Ross (BSC) Summary: The conference call began at 11:00 a.m. Eastern time on Thursday, September 15, 2005.

193

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 3-4, 2003 November 3-4, 2003 Crowne Plaza Hotel, Arlington, Virginia NERAC members present: John Ahearne, Vice Chairman Robert L. Long Thomas B. Cochran William F. Martin, Chairman Joseph R. Comfort Warren F. Miller Michael L. Corradini (Monday only) Sekazi K. Mtingwa Jose Luis M. Cortez Harold B. Ray Allen G. Croff Richard Reba Marvin S. Fertel Joy Lynn Rempe Beverly K. Hartline Michael B. Sellman Silvia S. Jurrison Allen L. Sessoms Andrew C. Klein Daniel C. Sullivan (Monday only) Dale E. Klein Neil E. Todreas NERAC members absent: Steve Fetter Jerry Paul Corbin McNeill Charles E. Till Richard A. Meserve Also participating: Arnold B. Baker, Chief Economist, Sandia National Laboratories

194

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2005, 11:00 a.m.-12:30 p.m. EST 24, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Ray English (Office of Naval Reactors, DOE), Bob Fronczak (Association of American Railroads), Bob Halstead (Nevada Agency for Nuclear Projects), Eric Huang (DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Adam Levin (Exelon Generation Company), Jim Reed (NCSL), Conrad Smith (CSG-East), Steve Sullivan (American Shortline Railroad Association),Ruth Weiner (Sandia National Laboratories) Contractor Support: Ralph Best (BSC), Randy Coppage (BAH),Ed Davis (BSC), Michele Enders (SAIC), Lee Finewood (BAH),and Ron Ross (BSC)

195

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.3 (January 2012) .3 (January 2012) 1 Compliance with U.S. Export Control Laws, Regulations and Policies References a. Federal Acquisition Regulations (FAR) 17.6, Management and Operating Contracts b. Department of Energy Acquisition Regulations (DEAR) 917.6, Management and Operating Contracts c. Atomic Energy Act of 1954 (AEA), as amended, http://www.nrc.gov/reading-rm/doc- collections/nuregs/staff/sr0980/v1/sr0980v1.pdf#page=13 (accessed 9/27/11) d. "Contractor Compliance with Deemed Export Controls," DOE Inspector General (IG) Report DOE/IG-0645, April 2004 e. "Review of Status of Prior Export Control Recommendations at the Department of

196

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 24, 2005, 11:00 a.m.-12:30 p.m. EST February 24, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Dennis Brooks (Texas Energy Conservation Office), Patrick Edwards (PA Public Utility Commission), Ray English (Office of Naval Reactors, DOE), Paul Genoa ( Nuclear Energy Institute), Eric Huang (DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Bill Mackie (Western Governors' Association [WGA]), Roger Mulder (Texas Energy Conservation Office), Ken Niles (WIEB), Jim Reed (NCSL), Lisa Sattler (CSG-Midwest), Conrad Smith (CSG-East), Sara Wochos (CSG-Midwest) Contractor Support: Ralph Best (BSC), Ed Davis (BSC), Michele Enders (SAIC),

197

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

03/1195 03/1195 Healy Clean Coal Project A DOE Assessment Office of Fossil Energy National Energy Technology Laboratory U.S. Department of Energy September 2003 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

198

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transportation External Coordination Working Group Meeting Transportation External Coordination Working Group Meeting Albuquerque, New Mexico April 21-23, 2004 The U.S. Department of Energy (DOE), Transportation External Coordination Working Group (TEC) held its 22 nd meeting on April 21-23, 2004, in Albuquerque, New Mexico. One hundred thirty-two participants, representing national, State, Tribal, and local government; industry; professional organizations; and other interested parties, met to address a variety of issues related to DOE's radioactive materials transportation activities. The TEC process includes the involvement of these key stakeholders in developing solutions to DOE transportation issues through their actual participation in the work product. These members provide continuing and improved coordination between DOE, other levels of

199

DRAFT  

U.S. Energy Information Administration (EIA)

covering the January report period must be received by February 20). ... Option (PEDRO) is a Windows-based application that will enable you to enter data ...

200

DRAFT  

National Nuclear Security Administration (NNSA)

began producing electrical and mechanical weapon components for the U.S. Atomic Energy Commission (a predecessor agency to DOENNSA) in part of the Main Manufacturing...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

031195 Healy Clean Coal Project A DOE Assessment Office of Fossil Energy National Energy Technology Laboratory U.S. Department of Energy September 2003 Disclaimer This report was...

202

DRAFT  

U.S. Energy Information Administration (EIA)

context of emergency response planning and actual emergencies. SANCTIONS . ... response, including the time of reviewing instructions, searching

203

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a significant utility resource. 5 Electric energy efficiency, load management and demand response programs also have achieved significant levels of demand savings. For...

204

**Draft**  

Science Conference Proceedings (OSTI)

GUIDELINES FOR AOCS SECTION ORGANIZATION (adopted May 2008) Updated November 2009 1 Table of Contents Introduction Definition of a Section Benefits to S

205

DRAFT  

National Nuclear Security Administration (NNSA)

that DOE will take to achieve its individual GHG-reduction targets, reduce long-term costs, and meet the full range of goals of the order. All SSPPs segregate GHG emissions...

206

draft  

Science Conference Proceedings (OSTI)

Jun 22, 2005 ... Santa Barbara is served by Amtrak Train Service. The Amtrak terminal is located in downtown Santa Barbara and in Goleta. From the terminal...

207

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

Steering Committee. ARCHIVE SAFARI 2000 will establish a Southern African Regional Data Center to provide tools for documenting, storing, searching, and distributing data and...

208

DRAFT  

Science Conference Proceedings (OSTI)

... Robotic Mobility Platform (RMP 400/ INL) ... if they are outfitted in cumbersome protective suits, which ... Jon Nelson Dynamic Protection Solutions ...

2008-05-02T23:59:59.000Z

209

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy...

210

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

dual-use equipment, materials and related technologies. (Reference p); Nuclear Non-Proliferation Treaty Exporters (Zangger) Committee at: http:www.zanggercommittee.org...

211

DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR THE TRANSFER OF THE KANSAS CITY PLANT, KANSAS CITY, MISSOURI U.S. Department of Energy National Nuclear Security Administration May 2013 DOE/EA-1947 CONVERSION FACTORS Metric to English English to Metric Multiply by To get Multiply by To get Area Square kilometers 247.1 Acres Square kilometers 0.3861 Square miles Square meters 10.764 Square feet Concentration Kilograms/sq. meter 0.16667 Tons/acre Milligrams/liter 1 a Parts/million Micrograms/liter 1 a Parts/billion Micrograms/cu. meter 1 a Parts/trillion Density Grams/cu. centimeter 62.428 Pounds/cu. ft. Grams/cu. meter 0.0000624 Pounds/cu. ft. Length Centimeters 0.3937 Inches Meters 3.2808 Feet Micrometers 0.00003937 Inches Millimeters 0.03937 Inches Kilometers 0.62137 Miles

212

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2005, 12:30 p.m.-1:30 p.m. EST 7, 2005, 12:30 p.m.-1:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Kevin Blackwell (FRA), Patrick Brady (Burlington Northern Santa Fe Railroad), Ray English (Office of Naval Reactors, DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Bill Mackie (Western Governors' Association [WGA]), Ellen Ott (Office of General Counsel, DOE), Tim Runyon (Illinois Department of Nuclear Safety), Lisa Sattler (CSG-Midwest), Ruth Weiner (SNL), Sara Wochos (CSG-Midwest) Contractor Support: Ralph Best (BSC), Andrea Dravo (BAH), Michele Enders (SAIC), Susan Knisely (BAH ), Julie Offner (BAH), and Ron Ross (BSC) Summary: The conference call began at 12:30 p.m. Eastern time on Thursday, January 27, 2005. Jay

213

-DRAFT-  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Effect of SCR NOx Control of the Effect of SCR NOx Control Technology on Mercury Speciation Thomas J. Feeley, III U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-6134 Fax: 412-386-4822 E-mail: thomas.feeley@netl.doe.gov Lynn A. Brickett U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-6574 Fax: 412-386-5917 E-mail: lynn.brickett@netl.doe.gov James T. Murphy Science Applications International Corporation 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-4115 Fax: 412-386-4516 E-mail: james.murphy@netl.doe.gov March 2003 Abstract The U.S. Environmental Protection Agency (EPA) performed an Information Collection Request

214

EA-1919: Notice of Availability of a Draft Programmatic Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Programmatic Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating from Radiological Areas DOE announces the availability for public review and comment of the Draft Programmatic Environmental Assessment (PEA) for the Recycling of Scrap Metals Originating from Radiological Areas. This Draft PEA for the Recycling of Scrap Metals Originating from Radiological Areas analyzes the potential environmental impacts associated with resuming the clearance of scrap metal, originating from DOE radiological areas, for recycling pursuant to improved procedures designed to assure that clearance for release is limited to metals meeting stringent criteria. This Draft PEA

215

GNEP PEIS Alternatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

currently performed in non-prototypic irradiation facilities (ATR and possibly HFIR; MTS in the future). - Prototypic steady state irradiation and examination is currently...

216

Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Draft 5: Draft and Evaluate RFPs to someone by E-mail Share Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs on Facebook Tweet about Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs on Twitter Bookmark Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs on Google Bookmark Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs on Delicious Rank Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs on Digg Find More places to share Better Buildings Neighborhood Program: Step 5: Draft and Evaluate RFPs on AddThis.com... Getting Started Driving Demand Financing Assess the Market Define Finance Program Objectives Identify & Engage Financial Partners Design the Financing Program

217

Draft Report to Congress: Energy Policy Act of 2005, Section...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land...

218

EIS-0473: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0473: EPA Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2...

219

EIS-0450: DOE Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of Draft Environmental Impact Statement EIS-0450: DOE Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct...

220

EIS-0460: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0460: DOE Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project,...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0450: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct...

222

EIS-0365: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV...

223

EIS-0460: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0460: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project,...

224

Vehicle Technologies Office: Draft Plug-In Hybrid Electric Vehicle...  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Plug-In Hybrid Electric Vehicle R&D Plan to someone by E-mail Share Vehicle Technologies Office: Draft Plug-In Hybrid Electric Vehicle R&D Plan on Facebook Tweet about...

225

Microsoft Word - N01673_B100 AA final draft  

Office of Legacy Management (LM)

Draft Building 100 Area Draft Building 100 Area Plume Management Alternatives Analysis March 2012 LMS/PIN/N01673 This page intentionally left blank LMS/PIN/N01673 Pinellas County, Florida, Site Environmental Restoration Project Draft Building 100 Area Plume Management Alternatives Analysis March 2012 This page intentionally left blank U.S. Department of Energy Draft Building 100 Area Plume Management Alternatives Analysis March 2012 Doc. No. N01673 Page i Contents Abbreviations ................................................................................................................................. iv Executive Summary .........................................................................................................................v

226

EA-1931: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

227

National Climate Assessment: Draft Report Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Report Information Print E-mail Draft Report Information Print E-mail Below you will find information about the draft of the Third National Climate Assessment Report. Although the public comment period is now closed, the draft report is still available for download at http://ncadac.globalchange.gov. Click here to view/print a two-page fact sheet about the National Climate Assessment. NCA facsheet What is the National Climate Assessment (NCA)? What are the objectives of the NCA? What is new about the Third NCA? Who is responsible for the NCA? How do I comment on the draft NCA report? What topics are covered in the Third NCA Report? Next steps Expected outcomes and benefits How can I get involved in the NCA? What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

228

Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, (DOE/EIS-0310-SA-01) (08/05/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-SA-01 0-SA-01 Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility Introduction and Background The Department of Energy (DOE), pursuant to the National Environmental Policy Act (NEPA), issued the Final PEIS for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure (NI) PEIS, DOE/EIS-0310) in December 2000. Under the Authority of the Atomic Energy Act of 1954, the DOE's missions include: (1) producing isotopes for research and applications

229

Appendix C Draft Stormwater Pollution Prevention Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C C Draft Stormwater Pollution Prevention Plan U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix C Draft Stormwater Pollution Prevention Plan Cover with Template.doc DRAFT Stormwater Pollution Prevention Plan CAPE WIND ENERGY PROJECT BARNSTABLE AND YARMOUTH, MASSACHUSETTS PREPARED FOR Cape Wind Associates, LLC 75 Arlington Street, Suite 704 Boston, MA 02116 PREPARED BY ESS Group, Inc. 888 Worcester Street, Suite 240 Wellesley, Massachusetts 02482 Project No. E159-000 November 29, 2006 ESS Group, Inc. © 2006 - This document or any part may not be reproduced or transmitted in any form or by any means, electronic, or mechanical, including photocopying, microfilming, and recording without the express written consent of ESS Group,

230

Responses to Public Comments on Draft Vitrification Melter Evaluation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Draft WVDP Vitrification Melter WIR Evaluation Comments on Draft WVDP Vitrification Melter WIR Evaluation 1 To provide greater transparency to the Department of Energy's (DOE) cleanup of nuclear legacy waste, DOE made the "West Valley Demonstration Project Draft Waste Incidental to Reprocessing Evaluation for the Vitrification Melter" (Draft WIR Evaluation) available for public and state review and comment and Nuclear Regulatory Commission (NRC) consultation review. The public comments on the Draft WIR Evaluation were submitted to DOE by one individual and two organizations:  Raymond C. Vaughan, PhD.,  The West Valley Citizen Task Force, and  The Coalition on West Valley Nuclear Wastes.

231

2006 Draft Rulemaking Activities Data Sheets  

NLE Websites -- All DOE Office Websites (Extended Search)

2006 DRAFT RULEMAKING 2006 DRAFT RULEMAKING ACTIVITIES DATA SHEETS APPLIANCE STANDARDS BUILDING TECHNOLOGIES PROGRAM U. S. DEPARTMENT OF ENERGY October 2005 1 Table of Contents (alphabetical order) Product Rulemaking Page Air Conditioners and Heat Pumps less than 65 kBtu/hr, 3-Phase (Commercial) Standards 1 Automatic Ice Makers (Commercial) Standards 2 Battery Chargers and External Power Supplies Determination 3 Battery Chargers and External Power Supplies Test Procedure 4 Ceiling Fans and Ceiling Fan Light Kits Standards 5 Central Air Conditioners and Heat Pumps (Residential) Standards 9 Central Air Conditioners and Heat Pumps (Residential) Test Procedure 10 Certain Incandescent Reflector Lamps (ER/BR) Coverage 11 Clothes Dryers (Residential) Standards 12

232

Salmon Creek Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

233

2006 Draft Rulemaking Activities Data Sheets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006 DRAFT RULEMAKING 2006 DRAFT RULEMAKING ACTIVITIES DATA SHEETS APPLIANCE STANDARDS BUILDING TECHNOLOGIES PROGRAM U. S. DEPARTMENT OF ENERGY October 2005 1 Table of Contents (alphabetical order) Product Rulemaking Page Air Conditioners and Heat Pumps less than 65 kBtu/hr, 3-Phase (Commercial) Standards 1 Automatic Ice Makers (Commercial) Standards 2 Battery Chargers and External Power Supplies Determination 3 Battery Chargers and External Power Supplies Test Procedure 4 Ceiling Fans and Ceiling Fan Light Kits Standards 5 Central Air Conditioners and Heat Pumps (Residential) Standards 9 Central Air Conditioners and Heat Pumps (Residential) Test Procedure 10 Certain Incandescent Reflector Lamps (ER/BR) Coverage 11 Clothes Dryers (Residential) Standards 12

234

Final Draft of RACER Audit  

SciTech Connect

This document describes the approach Waste and Environmental Services - Environmental Data and Analysis plans to take to resolve the issues presented in a recent audit of the WES-EDA Environmental Database relative to the RACER database. A majority of the issues discovered in the audit will be resolved in May 2011 when the WES-EDA Environmental Database, along with other LANL databases, are integrated and moved to a new vendor providing an Environmental Information Management (EIM) system that allows reporting capabilities for all users directly from the database. The EIM system will reside in a publicly accessible LANL cloud-based software system. When this transition occurs, the data quality, completeness, and access will change significantly. In the remainder of this document, this new structure will be referred to as the LANL Cloud System In general, our plan is to address the issues brought up in this audit in three ways: (1) Data quality issues such as units and detection status, which impinge upon data usability, will be resolved as soon possible so that data quality is maintained. (2) Issues requiring data cleanup, such as look up tables, legacy data, locations, codes, and significant data discrepancies, will be addressed as resources permit. (3) Issues associated with data feed problems will be eliminated by the LANL Cloud System, because there will be no data feed. As discussed in the paragraph above, in the future the data will reside in a publicly accessible system. Note that report writers may choose to convert, adapt, or simplify the information they receive officially through our data base, thereby introducing data discrepancies between the data base and the public report. It is not always possible to incorporate and/or correct these errors when they occur. Issues in the audit will be discussed in the order in which they are presented in the audit report. Clarifications will also be noted as the audit report was a draft document, at the time of this response.

Paige, Karen Schultz [Los Alamos National Laboratory; Gomez, Penelope E. [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

235

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the total energy they use, and California has a long history of leading the push to improve the energyCalifornia Energy Commission DRAFT STAFF REPORT ACHIEVING ENERGY SAVINGS IN CALIFORNIA BUILDINGS Saving Energy in Existing Buildings and Achieving a ZeroNetEnergy Future JULY 2011 CEC4002011007SD

236

DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

reauthorization of funding for the Renewable Energy Program. Following a legislative history of the RenewableDRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM 2010 ANNUAL REPORT TO THE LEGISLATURE OCOBER 2010 CEC3002010010CTD #12;CALIFORNIA ENERGY COMMISSION RENEWABLES COMMITTEE James D

237

DRAFT GUIDANCE Applying for Other Uses of  

E-Print Network (OSTI)

DRAFT GUIDANCE Applying for Other Uses of Phosphogypsum: Submitting a Complete Petition 40 CFR 61 Assignment 0-2 #12;Applying for Other Uses of Phosphogypsum: Submitting a Complete Petition Table of Contents phosphogypsum in stacks? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.4. What

238

Operation and Maintenance Guidelines for Draft Fans  

Science Conference Proceedings (OSTI)

The reliability, efficiency, and safety of draft fans in fossil fuel power plants depend on effective operating and maintenance practices. These guidelines systematically present state-of-the-art techniques that utility personnel can use in operation, maintenance, troubleshooting, inspection, and weld repair of major fan components and auxiliary systems.

1999-05-13T23:59:59.000Z

239

Revised Draft Forecast of Electricity Demand  

E-Print Network (OSTI)

. Forecasts of higher electricity and natural gas prices will fundamentally challenge energy intensive. These include the reduced growth in natural gas supplies in spite of significant drilling activity and #12;DRAFT the medium-high case, while paper and allied products has been below the medium-low. Future natural gas

240

Microsoft PowerPoint - 16.0855_Raines Draft Rev 4 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0855Raines Draft Rev 4 Microsoft PowerPoint - 16.0855Raines Draft Rev 4 Microsoft PowerPoint - 16.0855Raines Draft Rev 4 More Documents & Publications Earned Value (EV) Analysis...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

2011 Cost Symposium Agenda 4-28-11 web draft.xls | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 Cost Symposium Agenda 4-28-11 web draft.xls 2011 Cost Symposium Agenda 4-28-11 web draft.xls 2011 Cost Symposium Agenda 4-28-11 web draft.xls More Documents & Publications...

242

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

243

EIS-0450: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the environmental review, also announce the availability of the Draft EIS. EIS-0450-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of Final Environmental Impact

244

Blackout 2003: Conference for public review draft report on implementation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conference for public review draft report on Conference for public review draft report on implementation of the task force recommendations Blackout 2003: Conference for public review draft report on implementation of the task force recommendations On Thursday, June 22, in Washington, D.C., the U.S.-Canada Power System Outage Task Force will hold a conference for stakeholders and the public to comment on the draft of the final report of the Task Force. The draft report assesses the status of implementation of the recommendations made by the Task Force in its 2004 report on the causes of the blackout. Conference for public review draft report on implementation of the task force recommendations More Documents & Publications Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006

245

Draft Environmental Impact Statement Available for Public Review |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step forward in cleaning up the site. The document, entitled "Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D (Revised)), is a revision of the 1996 Cleanup and Closure

246

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

247

EIS-0403: EPA Notice of Availability of the Draft Programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of the Draft Programmatic Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0403: EPA Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Notice of Availability, Draft Environmental Impact Statement: Programmatic-Solar Energy Development in Six Southwestern States. Notice of Availability, Draft Environmental Impact Statement: Programmatic-Bureau of Land Management Solar Energy Program, DOE/EIS-0403 (December 2010 - 75 FR 78992) More Documents & Publications EIS-0455: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0455: Notice of Adoption of an Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental

248

DOE Issues Draft Request for Proposals for Hanford Site Occupational  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Draft Request for Proposals for Hanford Site Issues Draft Request for Proposals for Hanford Site Occupational Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce DOE Issues Draft Request for Proposals for Hanford Site Occupational Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce July 19, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE Geoffrey.Tyree@rl..doe.gov 509-376-4171 The Department of Energy today issued a Draft Request for Proposals (RFP) for an Occupational Medical Services acquisition at the Hanford Site in southeastern Washington State. The Draft RFP is one step in the process toward awarding a contract and provides an opportunity for companies, Hanford stakeholders, and the site's workforce to provide input on the Draft RFP. DOE will provide

249

EIS-0286: EPA Notice of Availability of the Revised Draft Environmenta...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Draft Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous)...

250

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

251

EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental...  

NLE Websites -- All DOE Office Websites (Extended Search)

33-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact...

252

EIS-0349: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. Approximately 195 acres of undeveloped land would be converted for the cogeneration facility; gas, water, wastewater, and steam pipelines; construction laydown areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic benefits of the proposed action, and identifies mitigation measures to compensate for the unavoidable impacts. Alternative

253

DOE Announces Additional Public Comment Meetings for Draft National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will...

254

EIS-0464: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County,...

255

The Department of Energy Releases Draft of Cybersecurity Risk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities Better...

256

Draft Report Chapter 2: Generation Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 2: Generation Adequacy More Documents & Publications Draft Report: Chapter 2 Generation Adequacy. Keeping The Lights On In the New World Electricity Advisory Committee...

257

EA-1750: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid, Center for Commercialization of Electric Technology, Technology Solutions for Wind Integration in ERCOT, Houston, Texas DOE prepared this draft EA to evaluate the...

258

EA-1705: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan The frontier Project consists of the design, construction and operation of a biorefinery producing ethanol and other co-products from cellulosic materials utilizing a proprietary pretreatment and fermentation process. Draft Environmental Assessment and Notice of Wetland Involvement for the Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan, DOE/EA-1705 (February 2011) More Documents & Publications EA-1705: Final Environmental Assessment EA-1705: Finding of No Significant Impact Pacific Ethanol, Inc

259

EIS-0285: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0285: Draft Environmental Impact Statement Bonneville Power Administration Transmission System Vegetation Management Program This EIS evaluates the potential environmental impacts of establishing Planning Steps for managing vegetaion for specific projets. Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). EIS-0285-DEIS-1999_0.pdf More Documents & Publications Report to Congress: Corridors and Rights-of-Way on Federal Lands EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement Funding for state, city, and county governments in the state includes:

260

DOE Extends Public Comment Period for the Draft Uranium Leasing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement DOE Extends Public...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Draft Chapter 4: Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A robust interstate electric transmission network must be developed to enable our electricity future. Draft Chapter 4: Transmission Adequacy More Documents & Publications...

262

Draft Site-Wide Environmental Impact Statement Nevada | National...  

National Nuclear Security Administration (NNSA)

> About Us > Our Operations > NNSA Office of General Counsel > National Environmental Policy Act (NEPA) > NEPA Reading Room > Draft Site-Wide Environmental Impact Statement...

263

EA-1925: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1925: Draft Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOE...

264

EIS-0397: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

265

EA-1890: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1890: Draft Environmental Assessment Reedsport Deployment and Ocean Test Project The scope of the DOE Reedsport Deployment and Ocean Test project...

266

EIS-0414: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the...

267

EA-1960: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western Area...

268

EIS-0377: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental impacts of...

269

EIS-0377: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S....

270

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor)...

271

EIS-0350: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

272

EIS-0383: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Orlando Gasification Project To Provide Cost-Shared Funding for Construction and Operation of Facilities...

273

EIS-0383: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result...

274

Idaho National Laboratory Stand-Off Experiment Range draft environment...  

NLE Websites -- All DOE Office Websites (Extended Search)

News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release December 22, 2010 Idaho National Laboratory Stand-Off Experiment Range draft environmental assessment...

275

EIS-0284: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

276

Draft CMRR SEIS References | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Draft CMRR SEIS References Home > About Us > Our Operations > NNSA Office of General Counsel > National Environmental...

277

EIS-0440: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt...

278

EIS-0440: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt...

279

EIS-0403-S1: Supplement to the Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

280

EIS-0455: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA EIS-0455-NOA-DEIS-2010.pdf More Documents &...

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0439: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0439: EPA Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, California EIS-0439-EPANOA-2010.pdf More Documents &...

282

EIS-0439: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

283

EIS-0455: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA EIS-0445-DEIS-Summary-20101.pdf...

284

EIS-0439: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western)...

285

EIS-0350: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos,...

286

Microsoft Word - Draft CMRR Hearing announcement.docx  

National Nuclear Security Administration (NNSA)

19 Rio Grande SUN on May 12 and 19 Public Hearings Scheduled for the Chemistry & Metallurgy Research Building Replacement Nuclear Facility Draft Supplemental Environmental...

287

Draft Site-Wide Environmental Impact Statement Nevada Summary...  

National Nuclear Security Administration (NNSA)

Summary Draft | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

288

EA-1923: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA...

289

EIS-0290: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0290: Draft Environmental Impact Statement U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste...

290

EA-1741: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1741: Draft Environmental Assessment Seattle Steam Company Combined Heat and Power at Post Street in Downtown Seattle, Washington (June 2010) This EA...

291

DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology...

292

EIS-0445: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0445: Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia This EIS evaluates the...

293

Householder's Perceptions of Insulation Adequacy and Drafts in the ...  

U.S. Energy Information Administration (EIA)

The 2001 RECS was the first RECS to request household perceptions regarding the presence of winter drafts in the home. The data presented in this report ...

294

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

295

EA-1892: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1892: Draft Environmental Assessment Direct Final Rule Energy Conservation Standards for Residential Furnaces and Residential Central Air Conditioners & Heat...

296

EIS-0435: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Availability for the Draft Environmental Impact Statement for the...

297

EIS-0469: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Statement EIS-0469: Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota This EIS evaluates the...

298

EA-1903: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1903: Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas This EA evaluates the potential environmental...

299

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chief Joseph Hatchery Program Chief Joseph Hatchery Program Draft Environmental Impact Statement DOE/EIS-0384 May 2007 Chief Joseph Hatchery Program Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Project: Chief Joseph Hatchery Program Cooperating Tribe: Confederated Tribes of the Colville Reservation State Involved: Washington Abstract: The Draft Environmental Impact Statement (DEIS) describes a Chinook salmon hatchery production program sponsored by the Confederated Tribes of the Colville Reservation (Colville Tribes). BPA proposes to fund the construction, operation and maintenance of the program to help mitigate for anadromous fish affected by the Federal Columbia River Power System dams on the Columbia River. The Colville Tribes want to produce adequate

300

Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

UK FT PDU Facility Draft EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2S 2S Draft Supplemental Environmental Assessment for University of Kentucky Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis Lexington, KY December 2013 Prepared for: Department of Energy National Energy Technology Laboratory This page intentionally left blank. Draft Supplemental Environmental Assessment DOE/EA-1642S Fischer-Tropsch Process Development Unit December 2013 Cover Sheet Proposed Action: The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with the University of Kentucky (UK) Center for Applied Energy Research (CAER), to partially fund the completion of the design, construction, and operation of a small-scale pilot plant for research related to the gasification of coal

302

Draft 1992 Resource Program : Summary Report.  

Science Conference Proceedings (OSTI)

The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future resource needs -- how much new resource development is needed by BPA, which types of resources to acquire and option, how to go about acquiring them, and how much to spend. The Northwest Power Planning Council completed a new Northwest Power Plan in 1991. This Draft Resource Program describes how BPA proposes to do its part to meet the Council's regional resource objectives.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

303

DRAFT LEAD COMMISSIONER REPORT 2013 INTEGRATED ENERGY POLICY  

E-Print Network (OSTI)

DRAFT LEAD COMMISSIONER REPORT 2013 INTEGRATED ENERGY POLICY REPORT CALIFORNIA ENERGY COMMISSION Andrew McAllister, Ph.D. Lead Commissioner, Integrated Energy Policy Report Robert P. Oglesby was prepared under the 2013 Integrated Energy Policy Report proceeding, Docket #13-IEP-1A. The draft report

304

DRAFT LEAD COMMISSIONER REPORT 2012 INTEGRATED ENERGY POLICY  

E-Print Network (OSTI)

DRAFT LEAD COMMISSIONER REPORT 2012 INTEGRATED ENERGY POLICY REPORT UPDATE CALIFORNIA ENERGY COMMISSION Carla J. Peterman Lead Commissioner, Integrated Energy Policy Report Robert P. Oglesby was prepared under the 2012 Integrated Energy Policy Report proceeding, Docket #12-IEP-1A. The draft report

305

Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.  

SciTech Connect

This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

306

Draft Report Development of Model Curriculum in Renewable Energy  

E-Print Network (OSTI)

Draft Report On Development of Model Curriculum in Renewable Energy Energy Systems Engineering, Indian Institute of Technology Bombay Powai, Mumbai ­ 400 076 August 2003 #12;Draft Renewable Energy energy systems for the future, it is necessary to incorporate renewable energy in the traditional

Banerjee, Rangan

307

West Valley Melter Draft Waste Evaluation Released for Public Comment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Melter Draft Waste Evaluation Released for Public Melter Draft Waste Evaluation Released for Public Comment West Valley Melter Draft Waste Evaluation Released for Public Comment March 11, 2011 - 12:00pm Addthis Media Contact Bill Taylor (513) 246-0539 william.taylor@emcbc.doe.gov West Valley, New York - The U.S. Department of Energy today released a Draft Waste Incidental to Reprocessing (WIR) Evaluation of a vitrification melter at the West Valley Demonstration Project (WVDP) for review and comment by the public, states and Nuclear Regulatory Commission (NRC). This draft evaluation shows that the melter meets the criteria for "waste incidental to reprocessing" and may be managed and disposed of as low-level radioactive waste (LLW). It is an important step in DOE's efforts to clean up the WVDP and meet its obligations under the WVDP Act of

308

EIS-0442: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

2: EPA Notice of Availability of Draft Environmental Impact 2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska. EIS-0442-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0389: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

309

EA-1889: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Draft Environmental Assessment 9: Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the Navy has prepared a Draft Environmental Assessment (EA) on the Disposal of Decommissioned, Defueled, Naval Reactor Plants from the USS Enterprise. The world's first nuclear-powered naval aircraft carrier, Enterprise, is scheduled for decommissioning in 2013, following 51 consecutive years of service. Because the preferred alternative is to dispose of the Enterprise reactor plants at the Department of Energy's Hanford Site*, the Department of Energy is a cooperating agency for this EA. For additional information on the Draft Enterprise EA, please contact Mary Mascianica at (360) 476-7111.

310

The Department of Energy Releases Draft of Cybersecurity Risk Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy Releases Draft of Cybersecurity Risk The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities Better Understand and Assess Cybersecurity Risk WASHINGTON, DC - The Department of Energy, in collaboration with the National Institute of Standards and Technology and the North American Electric Reliability Corporation, has released a draft of the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline for public comment. The RMP Guideline was drafted by a joint public-private sector team that also included representatives from the Federal Energy Regulatory

311

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

312

EIS-0442: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah This Draft EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. It evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx EIS-0442: Draft Environmental Impact Statement More Documents & Publications

313

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

314

EIS-0431: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA EPA announces the availability of the Draft Environmental Impact Statement for the Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. EIS-0431-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0460: EPA Notice of Availability of Final Environmental Impact

315

DOE Announces Additional Public Comment Meetings for Draft National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces Additional Public Comment Meetings for Draft National DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations, May 8, 2007. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations, May 8, 2007. The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007. The four additional meetings will be held in June in: Phoenix, Arizona; Las Vegas, Nevada; Pittsburgh, Pennsylvania; and Rochester, New York. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations, May 8, 2007. More Documents & Publications DOE Affirms National Interest Electric Transmission Corridor Designations

316

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

317

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Two Draft National Interest Electric Transmission Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations April 26, 2007 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors. "These draft designations set us on the path to modernize our constrained and congested electric power infrastructure. They are a crucial step toward realizing President Bush's goal of a modern, more efficient electric

318

EIS-0286: Revised Draft Environmental Import Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Import Statement 6: Revised Draft Environmental Import Statement EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington The revised draft of the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. DOE/EIS-0286, Richland Operations Office, Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington - Summary (March 2003) EIS-0286-D2-DEIS-01-2003.pdf EIS-0286-D2-DEIS-02-2003_0.pdf More Documents & Publications

319

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

320

The Department of Energy Releases Draft of Cybersecurity Risk Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy Releases Draft of Cybersecurity Risk The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) September 12, 2011 - 10:05am Addthis Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities Better Understand and Assess Cybersecurity Risk WASHINGTON, DC - The Department of Energy, in collaboration with the National Institute of Standards and Technology and the North American Electric Reliability Corporation, has released a draft of the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline for public comment. The RMP Guideline was drafted by a joint public-private sector

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Energy Department Releases Draft Advanced Fossil Energy Solicitation to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Draft Advanced Fossil Energy Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution Energy Department Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution July 2, 2013 - 12:42pm Addthis NEWS MEDIA CONTACT (202) 586-4940 Washington, D.C. - As part of President Obama's Climate Action Plan, the U.S. Department of Energy announced today a draft loan guarantee solicitation for innovative and advanced fossil energy projects and facilities that substantially reduce greenhouse gas and other air pollution. The Advanced Fossil Energy Projects solicitation, authorized by Title XVII of the Energy Policy Act of 2005 through Section 1703 of the Loan Guarantee Program, does just that. The draft solicitation will be open

322

Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion  

NLE Websites -- All DOE Office Websites (Extended Search)

Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II Title Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II Publication Type Report LBNL Report Number LBNL-6193E Year of Publication 2013 Authors Rapp, Vi H., Albert Pastor-Perez, Brett C. Singer, and Craig P. Wray Date Published 04/2013 Abstract VENT-II is a computer program designed to provide detailed analysis of natural draft and induced draft combustion appliance vent-systems (i.e., furnace or water heater). This program is capable of predicting house depressurization thresholds that lead to backdrafting and spillage of combustion appliances; however, validation reports of the program being applied for this

323

Public Invited to Comment on Draft Environmental Assessment for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office NOTICE: DOE has extended the public comment period on its Draft Environmental Assessment for Resumption of Transient Testing of Nuclear Fuels and Materials to January 10, 2014. The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National

324

EA-1954: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

4: Draft Environmental Assessment 4: Draft Environmental Assessment EA-1954: Draft Environmental Assessment Resumption of Transient Testing of Nuclear Fuels and Materials at the Idaho National Laboratory, Idaho This EA evaluates the potential environmental impacts associated with DOE's proposed action to resume transient testing at INL's Transient Reactor Test Facility reactor approximately 38 miles west of Idaho Falls, Idaho or to start transient testing at SNL's Annular Core Research Reactor in Albuquerque, New Mexico. The draft EA identifies INL as the preferred location and describes DOE's reasons for identifying INL as the preferred location. EA-1954-DEA-2013.pdf More Documents & Publications EIS-0281: Draft Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement

325

EA-1814: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1814: Draft Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System, Montpelier, Vermont The U.S. Department of Energy (DOE) is proposing to provide Federal funding through the Community Renewable Energy Deployment Program to the City of Montpelier for the design, permitting, and construction of a combined heat and power (CHP) and district energy system. This Draft EA analyzes the foreseeable environmental impacts of the proposed project and the alternative of not implementing this project (the No-Action Alternative), including the construction of a new heat plant and district energy system within a 100 year floodplain. Draft Environmental Assessment for City of Montpelier Combined Heat and

326

EIS-0340: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project To assist in the conservation and recovery of Chinook salmon native to the Grande Ronde River and Imnaha River subbasins, the Proposed Action of updating and modifying two existing hatcheries and constructing three new hatchery facilities at other sites is being studied in this Draft Environmental Impact Statement (Draft EIS). BPA proposes to fund the capital improvements and the operation and maintenance of all five facilities to aid BPA's efforts to mitigate and recover anadromous fish affected by the Federal Columbia River Power System. The Lower Snake River run of spring/summer chinook was listed as threatened under the Endangered

327

New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft of Cybersecurity Risk Management Process (RMP) Guideline Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) March 1, 2012 - 3:26pm Addthis The Department of Energy, in collaboration with the National Institute of Standards and Technology (NIST) and the North American Electric Reliability Corporation (NERC), has released a second draft of the Electricity Subsector Cybersecurity Risk Management Process (RMP) guideline for public comment. This new draft, which will be the last opportunity for public comment prior to final publication, incorporates input submitted by the electric sector during the first public comment period. Many of the submitted comments suggested that the guideline:

328

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

329

EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

472: Notice of Public Scoping Meetings and Extension of 472: Notice of Public Scoping Meetings and Extension of Scoping Period EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period Uranium Leasing Program Programmatic Environmental Impact Statement Comment Period Ends: 09/09/11 Submit Comments to: Laura Kilpatrick, Esq. DOE ULP Program Manager Office of Legacy Management U.S. Department of Energy 11025 Dover Street, Suite 1000 Westminster, CO 80021 Electronic comments: http://ulpeis.anl.gov Electronic mail: ulpeis@anl.gov DOE will host public scoping meetings in western Colorado to receive comments on the scope of the DOE Uranium Leasing Program (ULP) Programmatic Environmental Impact Statement (hereinafter referred to as the ULP PEIS). The PEIS will analyze the reasonably foreseeable environmental impacts,

330

EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Notice of Public Scoping Meetings and Extension of 2: Notice of Public Scoping Meetings and Extension of Scoping Period EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period Uranium Leasing Program Programmatic Environmental Impact Statement Comment Period Ends: 09/09/11 Submit Comments to: Laura Kilpatrick, Esq. DOE ULP Program Manager Office of Legacy Management U.S. Department of Energy 11025 Dover Street, Suite 1000 Westminster, CO 80021 Electronic comments: http://ulpeis.anl.gov Electronic mail: ulpeis@anl.gov DOE will host public scoping meetings in western Colorado to receive comments on the scope of the DOE Uranium Leasing Program (ULP) Programmatic Environmental Impact Statement (hereinafter referred to as the ULP PEIS). The PEIS will analyze the reasonably foreseeable environmental impacts,

331

IETF Internet-Draft Intended status: Informational  

E-Print Network (OSTI)

Towards an Information-Centric Internet with more Things draft-kutscher-icn-iwmt-00 The Internet is already made of things. However, we expect there to be many more less-capable things, such as sensors and actuators, connected to the Internet in years to come. In parallel, Internet applications are more and more being used to perform operations on named (information) objects, and various Information-Centric Networking (ICN) approaches are being researched in order to allow such applications to work effectively at scale and with various forms of mobility and in networking environments that are more challenging than a traditional access network and data center. In this position paper, we outline some benefits that may accrue, and issues that arise, should the Internet, with many more things, make use of the ICN approach to networking and we argue that ICN concepts should be considered when planning for increases in the number of things connected to the Internet. Status of this Memo This Internet-Draft is submitted in full conformance with the

D. Kutscher; S. Farrell

2011-01-01T23:59:59.000Z

332

Draft 1992 Resource Program : Technical Report.  

DOE Green Energy (OSTI)

The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

333

Draft 1992 Resource Program : Technical Report.  

DOE Green Energy (OSTI)

The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

334

Accelerating Cleanup: Focus on 2006. Discussion draft  

SciTech Connect

This executive summary addresses the activities associated with the National Transuranic (TRU) Program managed by the Carlsbad Area Office (CAO). The CAO programmatically reports to the Assistant Secretary for Environmental Management and receives administrative support through the Albuquerque Operations Office. The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant for site disposal of TRU waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to the CAO, the Waste Isolation Pilot Plant (WIPP) site operations, and other activities associated with the National TRU Program. The CAO develops and directs implementation of the program, while the DOE Headquarters establishes policy and guidelines. The CAO assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all the sites. Since the development of the February 28, 1997, database used to develop this Discussion Draft, the opening of the WIPP facility for receipt of Contact Handled waste has been delayed from November 1997 to May 1998. This slippage is significant enough to require a change in the milestones and volumes included in the documents to be reviewed by our stakeholders. Changes have been incorporated into this Discussion Draft and its supporting Project Baseline Summaries (PBSs).

None

1997-06-01T23:59:59.000Z

335

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

336

EIS-0396: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Programmatic Environmental Impact Statement 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained production of nuclear-generated electricity, while reducing the impacts associated with spent nuclear fuel disposal and reducing proliferation risks. The Department of Energy (DOE) proposed action envisions changing the United States nuclear energy fuel cycle from an open (or once-through) fuel

337

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

338

EIS-0382: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 606 megawatts of electricity (MWe) for export to the electrical grid, 1,212 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

339

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

340

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EA-1867: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1867: Draft Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE prepared this Draft EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's total $171.8 million funding for the proposed project would be provided from funds authorized in the American Recovery and Reinvestment Act of 2009 (Public Law 111-5, 123 Stat. 115). RTI's

342

EIS-0336: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the proposed action and reasonable alternatives, including the "No Action" alternative. In addition, because the U.S. Forest Service, the Bureau of Land Management, and the U.S. International Boundary Water Commission (USIBWC) must act, and because their actions are

343

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution July 2, 2013 - 12:16pm Addthis What are the key facts? This solicitation will support projects that avoid, reduce, or sequester air pollutants or greenhouse gas emissions, an important part of the Administration's long-term plan towards a cleaner and more secure energy future. Applications for projects and facilities include any fossil technology that is new or significantly improved, as compared to commercial technologies in service in the U.S. The Department of Energy's (DOE) Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy

344

EIS-0250: EPA Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Supplemental EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor EIS-0250-DEIS-EPANOA-S1S2-2nd-2007.pdf More Documents & Publications EIS-0357: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact

345

Department of Energy Issues Draft Request for Proposals for Argonne  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Request for Proposals for Argonne Draft Request for Proposals for Argonne National Laboratory Contractor Department of Energy Issues Draft Request for Proposals for Argonne National Laboratory Contractor January 3, 2006 - 9:06am Addthis WASHINGTON, DC -- The Department of Energy (DOE) is seeking comments on a draft Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor for Argonne National Laboratory (ANL), a major DOE Office of Science research facility located near Chicago, Ill. This competition for a laboratory contractor is the first in the history of the lab. ANL is a multiprogram laboratory, funded at approximately $492 million annually by the Office of Science (SC), other DOE programs, as well as other government agencies and private industry. Argonne was chartered in

346

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of Draft Environmental Impact DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

347

EIS-0435: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0435: Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to modify its interconnection agreement with Basin Electric for the Groton Generation Station to eliminate Western's 50-megawatts (MW) annual average operating limit. The Groton Generation Station is located about 5 miles south of Groton, South Dakota. Basin Electric needs to eliminate the operating limit to help serve increased load demand for electric power in the eastern portion of its service area Western Area Power Administration Draft Environmental Impact Statement

348

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

349

EIS-0423: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE proposes to construct one or more new facilities and/or select one or more existing facilities (including modification as needed) for the long-term management and storage of mercury, as mandated by Section 5 of the Act. Any such facility must comply with applicable requirements of Section 5 of the Act, "Management Standards for a Facility," including the requirements of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901 et seq.) and other permitting requirements. Draft Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement, DOE/EIS-0423D (January 2010)

350

EIS-0464: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture and Sequestration (ICCS) Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60

351

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

352

EIS-0409: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and hot exhaust gas from the gas turbines would generate steam from water to drive a steam turbine. EIS-0409-DEIS-Summary-2009.pdf Draft Environmental Impact Statement, Kemper...

353

EIS-0423: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement and Notice of Public Hearings Long-Term Management and Storage of Elemental Mercury Notice of Availability of the Draft Long-Term Management and Storage of Elemental...

354

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

355

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

356

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

357

Public Invited to Comment on Draft Environmental Assessment for Replacement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site September 1, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

358

DOE Media Advisory - DOE extends public comment period on Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Media Advisory - DOE extends public comment period on Draft Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site DOE Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site October 13, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy's Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for

359

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0447: DOE Notice of Availability of Draft Environmental Impact EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

360

DOE Announces Additional Public Comment Meetings for Draft National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Additional Public Comment Meetings for Draft National Announces Additional Public Comment Meetings for Draft National Corridor Designations DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations May 8, 2007 - 11:00am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007. The four additional meetings will be held in June in: Phoenix, Arizona; Las Vegas, Nevada; Pittsburgh, Pennsylvania; and Rochester, New York. Dates and locations will be published in the Federal Register in the coming days. DOE previously announced it would host three public meetings at the

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Release of DRAFT RFP Headquarters Reading Room Instructions/Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Release of DRAFT RFP Release of DRAFT RFP Headquarters Reading Room Instructions/Guidelines 1. Reading Room Points of Contact: 7/21 - 8/8, Mike Baehre, (202) 586-6575 8/9 - Close of Draft RFP, John Bernier, (202) 586-6416 Reading Room Availability: By Appointment - Reading Room will be available until DRAFT RFP Closes. Reading Room Hours: Morning, 9:00 a.m. - 11:30 a.m.; and Afternoon 1:00 p.m. - 3:30 p.m. Reading Room Will Accommodate: Up to 5-6 people 2. All personnel must: a. Sign-in b. Identify their Company or Firm they work for or are affiliated c. Indicate if they have a "Q" clearance 3. Personnel must stay in the Reading Room to view documents. The "A" corridor is inside a classified area and all visitors to the Reading Room must be escorted at all times.

362

EIS-0385: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0385: Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve As required by the Energy Policy Act of 2005 (P.L. 109-58), DOE would expand the SPR to its full authorized 1 billion-barrel capacity by selecting additional storage sites. DOE would develop one new site or a combination of two new sites, and would expand capacity at two or three existing sites. Storage capacity would be developed by solution mining of salt domes and disposing of the resulting salt brine by ocean discharge or underground injection. New pipelines, marine terminal facilities, and other infrastructure could also be required. DOE has prepared this draft EIS to address the environmental impacts of the proposed expansion of the capacity

363

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

364

EA-1912: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

365

Co~uter Aided Design/Drafting Development Recommendation  

NLE Websites -- All DOE Office Websites (Extended Search)

Co~uter Aided Design/Drafting Co~uter Aided Design/Drafting Development Recommendation for The Light Source Project K. J. Knott LS-71 September 1986 (9/8/86) LS-71 1.0 Introduction During all phases of the design of the 6-7 GeV Synchrotron Light Source, the design staff has assumed that most or all design and drafting for the pro- ject would be based on modern Computer-Aided Design/Drafting (CAD) equipment. The reasons and justification for this assumption are many and varied and include the following: 1. It represents a cost-effective approach to these tasks. 2. It represents a local and national trend in engineering technology. 3. It opens the possibility for numerical control (NC) interfaces. 4. It opens the possibility for Computer-Aided-Engineering (CAE) applications such as stress, temperature and other finite-element

366

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

367

EIS-0488: Notice of Availability Draft Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: Notice of Availability Draft Environmental Impact 488: Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. EIS-0488-DEIS-NOA-2014.pdf More Documents & Publications

368

EA-1806: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Environmental Assessment 6: Draft Environmental Assessment EA-1806: Draft Environmental Assessment Libman Company Wind Energy Project Arcola, Douglas County, Illinois The U.S. Department of Energy (DOE) has provided a grant to the State of Illinois and is proposing to authorize the expenditure of Federal funding to design, permit, and construct the Libman Wind Energy Project, a proposed 1.5 megawatt (MW) wind turbine to be located north of the Libman manufacturing facility in Arcola, Douglas County, Illinois. Draft Environmental Assessment for the Libman Company Wind Energy Project Arcola, Douglas County, Illinois, DOE/EA-1806 (November 2010) More Documents & Publications EA-1804: Final Environmental Assessment EA-1859: Final Environmental Assessment EA-1818: Final Environmental Assessment

369

EA-1792: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This EA evaluates the environmental impacts of the Proposed Action and the No-Action Alternative; identifies unavoidable adverse environmental impacts of the Proposed Action; describes the relationship between local short-term uses of the environment and the maintenance and enhancement of long-term productivity; and characterizes any irreversible and irretrievable commitments of resources that would be involved should DOE decide to implement its Proposed Action. Draft Environmental Assessment for University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, DOE/EA-1792 (May

370

NETL: News Release - DOE Releases Draft Funding Opportunity Announcement  

NLE Websites -- All DOE Office Websites (Extended Search)

October 4, 2007 October 4, 2007 DOE Releases Draft Funding Opportunity Announcement for CCPI Round 3 Washington, DC - The U.S. Department of Energy has released for public comment the draft Funding Opportunity Announcement (FOA), Model Cooperative Agreement, and Model Payment Agreement for Round 3 of the Clean Coal Power Initiative (CCPI). CCPI invites private industries to partner with Government to demonstrate new clean coal technologies at commercial scale. MORE INFO Read the Draft FOA Register for the Public Workshop [beginning 10.05.07] The draft FOA allows interested parties to voice concerns and seek answers to questions regarding the cost-shared partnership. The public comment period begins immediately and continues through November 9, 2007. In addition, a public meeting will be held on November 1, 2007, at the Hyatt

371

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

372

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution July 2, 2013 - 12:16pm Addthis What are the key facts? This solicitation will support projects that avoid, reduce, or sequester air pollutants or greenhouse gas emissions, an important part of the Administration's long-term plan towards a cleaner and more secure energy future. Applications for projects and facilities include any fossil technology that is new or significantly improved, as compared to commercial technologies in service in the U.S. The Department of Energy's (DOE) Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy

373

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

606: Draft Environmental Assessment 606: Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

374

Extension of Comment Period on the Draft Integrated, Interagency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period on the Draft Integrated, Interagency Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations September 25, 2013 - 4:24pm Addthis On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on

375

EIS-0355: EPA Notification of Availability of the Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notification of Availability of the Draft EPA Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

376

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

377

EA-1948: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1948: Draft Environmental Assessment Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. EA-1948-DEA-2013.pdf More Documents & Publications CX-007149: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination

378

EIS-0488: FERC Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

88: FERC Draft Environmental Impact Statement 88: FERC Draft Environmental Impact Statement EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

379

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

380

Public Invited to Comment on Draft Environmental Assessment for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National Laboratory (INL) or Sandia National Laboratories (SNL). Transient testing involves placing fuel or material into the core of a nuclear reactor and subjecting it to short bursts of intense, high-power

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE Issues Draft Request for Proposals Seeking Contractor to Manage,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Draft Request for Proposals Seeking Contractor to DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant April 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP)seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million per year, for five years, with an option to extend the contract for an additional five years. DOE anticipates awarding a competitive, cost-plusaward-fee

382

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

383

EIS-0444: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

384

EIS-0473: DOE Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the...

385

NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ), incollaboration with the California Governors Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

386

Microsoft Word - 40913 Final Report Draft.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

i GAS TURBINE REHEAT USING IN SITU COMBUSTION Final Report (Draft) Reporting Period Start Date - October 1, 2000 Reporting Period End Date - May 31, 2004 by D.M. Bachovchin T.E....

387

NCPA No. 2: IX comments and responses to Draft JES  

DOE Green Energy (OSTI)

Comments received from twenty-six separate entities are included. Following each letter or set of comments are staff responses. Sections of the draft environmental statement which have been revised in response to these comments are noted. (PCS)

Not Available

1980-01-01T23:59:59.000Z

388

Draft Program June 29, 2012 International Conference on Biofuels Standards  

E-Print Network (OSTI)

Draft Program June 29, 2012 4th International Conference on Biofuels Standards: Current Issues, Future Trends Surface Transport Biofuels - Current State of Technology, Production and Markets for: Bioethanol (from Corn, Sugarcane, Cellulose) Biodiesel Other biofuels ­ Biobutanol, Biomethanol, Biomethane

389

Rad Monioring Subgroup Draft 1 Work Plan 020408  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 3 (Draft) Work Plan for the DOE TEC Rail Topic Group Radiation Monitoring Sub-Group Status: Active TEC Stakeholder Leads: Marty Vyenielo (PANE Task Force), Cort Richardson...

390

Draft Environmental Impact Statement for the Disposal of Greater...  

NLE Websites -- All DOE Office Websites (Extended Search)

for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste WASHINGTON The Department of Energy (DOE) has issued a Draft Environmental...

391

Microsoft Word - GJPPGPracticesDraft.doc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Microsoft Word - GJPPGPracticesDraft.doc More Documents & Publications 1 Biofuels & Greenhouse Gas Emissions: Myths versus Facts Microsoft Word - 47C468D4-69BA-281F40.doc...

392

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Impact Statement 8: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

393

EIS-0488: EPA Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: EPA Notice of Availability of Draft Environmental Impact 488: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is

394

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

395

EA-1080: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1080: Draft Environmental Assessment Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System This environmental assessment (EA) evaluates the potential impacts of a proposed demonstration project to be cost-shared by DOE and NOXSO Corporation under the terms of Clean Coal Technology (CCT) Demonstration Program. The project would demonstrate the NOXSO flue gas treatment technology, which is designed to reduce sulfur dioxide (SO2) and nitrogen oxides (NOX) emissions from existing coal-fired electric generating units. Draft Environmental Assessment for the Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications EA-1080: Finding of No Significant Impact

396

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

397

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

398

Utility Energy Services Contracts: Enabling Documents DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Energy Services Contracts: Enabling Documents 2008 Interim Update: Final Draft Prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Federal Energy Management Program November 2008 DOE/GO-102008-2588 www.eere.energy.gov/femp Department of Energy Washington, D.C. Dear Colleagues, The U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) is pleased to present this third edition of Utility Energy Services Contracts: Enabling Documents. These documents provide a selected set of background information materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs). Since the first edition, UESCs have been used successfully to implement nearly $2 billion in

399

Glossary of Key Information Security Terms (Draft)  

E-Print Network (OSTI)

Certain commercial entities, equipment, or materials may be identified in this document in order to describe an experimental procedure or concept adequately. Such identification is not intended to imply recommendation or endorsement by NIST, nor is it intended to imply that the entities, materials, or equipment are necessarily the best available for the purpose. There may be references in this publication to other publications currently under development by NIST in accordance with its assigned statutory responsibilities. The information in this publication, including concepts and methodologies, may be used by Federal agencies even before the completion of such companion publications. Thus, until each publication is completed, current requirements, guidelines, and procedures, where they exist, remain operative. For planning and transition purposes, Federal agencies may wish to closely follow the development of these new publications by NIST. Organizations are encouraged to review all draft publications during public comment periods and

Richard Kissel; Richard Kissel

2012-01-01T23:59:59.000Z

400

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joseph Hatchery Program Joseph Hatchery Program Draft EIS S-1 SUMMARY Purpose and Need The Northwest Power and Conservation Council (NPCC, www.nwcouncil.org) recommended that the Bonneville Power Administration (BPA) study and consider funding a Chinook salmon production program and hatchery proposed by the Confederated Tribes of the Colville Reservation (Colville Tribes). The proposal intends to increase returns of adult summer/fall Chinook by raising and releasing juvenile fish in the waters of the Okanogan River, and in the Columbia River below Chief Joseph Dam and above its confluence with the Okanogan River. The proposed program would construct, operate and maintain a hatchery below the Chief Joseph Dam on the Columbia River and several fish acclimation and release ponds on the Okanogan River and Omak

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EXTERNAL PEER REVIEW REPORT Sabine-Neches Waterway (SNWW) Channel Improvement Plan (CIP) Draft Feasibility  

E-Print Network (OSTI)

........................................................B-1 LIST OF TABLES Table 1. Schedule Feasibility Report (DFR) and Draft Environmental Impact Statement (DEIS) for proposed improvements to the SNWW Feasibility Report (DFR) and Draft Environmental Impact Statement (DEIS) for proposed improvements to the SNWW

US Army Corps of Engineers

402

Energy Policy Act of 2005, Section 1813, Draft Report to Congress...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1813, Draft Report to Congress: Federal Register Notice Volume 71, No. 153 - Aug. 9, 2006 Energy Policy Act of 2005, Section 1813, Draft Report to Congress: Federal Register Notice...

403

EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmen...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide...

404

EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmen...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12...

405

DRAFT STELLAR White paper Early Years and Technology. March 2011 STELLAR 2nd  

E-Print Network (OSTI)

DRAFT STELLAR White paper ­ Early Years and Technology. March 2011 - 1 and evaluation of technologies to support young children's learning White paper hal-00722846,version1-5Aug2012 #12;DRAFT STELLAR White paper ­ Early Years

Paris-Sud XI, Université de

406

Wake-Up Call: Draft Security Pub Looks at Cell Phones, PDAs  

Science Conference Proceedings (OSTI)

Wake-Up Call: Draft Security Pub Looks at Cell Phones, PDAs. For Immediate Release: July 9, 2008. ...

2011-05-03T23:59:59.000Z

407

Induced draft fan innovation for heat recovery steam generators  

SciTech Connect

A first of its kind, induced draft (ID) heat recovery steam generators (HRSG) have been in service at a cogeneration facility since 1991. A preliminary engineering study considered a forced draft (FD) fan to supply combustion air to the HRSG duct burners (when the combustion turbine (CT) is out of service) as a traditional design; however, the study indicated that the FD fan may require the HRSG duct burner to be shut off following a CT trip and re-ignited after the FD fan was in service. Although the induced draft HRSG design cost more than the FD fan design, the induced draft design has improved the cogeneration facility's steam generation reliability by enabling the HRSG to remain in service following a CT trip. This paper briefly summarizes the preliminary engineering study that supported the decision to select the ID fan design. The paper also discusses the control system that operates the fresh-air louvers, duct burners, HRSG, and ID fan during a CT trip. Startup and operating experiences are presented that demonstrate the effectiveness of the design. Lessons learned are also summarized for input into future induced draft HRSG designs.

Beasley, O.W.; Hutchins, E.C. (Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)); Predick, P.R.; Vavrek, J.M. (Sargent and Lundy, Chicago, IL (United States))

1994-04-01T23:59:59.000Z

408

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature  

E-Print Network (OSTI)

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction CENTER FOR IMAGING SCIENCE Title of Dissertation: Radiometric Modeling of Mechanical Draft Cooling Towers of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from Remote Thermal

Salvaggio, Carl

409

CGDK: An extensible CorelDRAW VBA program for geological drafting  

Science Conference Proceedings (OSTI)

Corel Geological Drafting Kit (CGDK), a program written in VBA, has been designed to assist geologists and geochemists with their drafting work. It obtains geological data from a running Excel application directly, and uses the data to plot geochemical ... Keywords: CGDK, CorelDRAW, Excel, Geological drafting, Software, VBA

Jun-Ting Qiu; Wan-Jiao Song; Cheng-Xin Jiang; Han Wu; Raymond M. Dong

2013-02-01T23:59:59.000Z

410

EIS-0407: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0407: Draft Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide approximately $85 million of the total anticipated cost of approximately $300 million (2008 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity) sufficient to meet the needs of

411

EIS-0399: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a merchant 230-kV transmission line between Great Falls, Montana, and Lethbridge, Alberta, that would cross the U.S.-Canada border north of Cut Bank, Montana. The transmission line would transmit 300 megawatts (MW) of electric power south and 300 MW north. EIS-0399-DEIS-Summary-2008.pdf EIS-0399-DEIS-01a-2008.pdf EIS-0399-DEIS-01b-2008.pdf EIS-0399-DEIS-01c-2008.pdf EIS-0399-DEIS-01d-2008.pdf EIS-0399-DEIS-01e-2008.pdf EIS-0399-DEIS-02-2008.pdf More Documents & Publications EIS-0399: Final Environmental Impact Statement EIS-0399-SA-01: Supplement Analysis Management Alert: OAS-RA-12-01

412

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

413

EA-1800: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1800: Draft Environmental Assessment Monarch Warren County Wind Turbine Project, Lenox Township, Warren County, Illinois The U.S. Department of Energy (DOE) has provided Federal funding to the Illinois Department of Commerce and Economic Opportunity (DCEO) under the State Energy Program (SEP). DCEO is seeking to provide $5 million of its SEP funds to Monarch Wind Power (MWP), who would use these funds for the design, permitting and construction of 12, 1.6- megawatt wind turbines, for a combined generation capacity of 19.2 megawatts. This EA provides DOE and other decisionmakers the information needed to make an informed decision about the installation, operation, and eventual decommissioning of the proposed wind project. The EA evaluates the potential individual and

414

EIS-0400: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the environmental impacts of a proposal to rebuild and upgrade the Western Area Power Administration's 12-mile Granby Pumping Plant-Windy Gap 69-kV transmission line in Grand County, Colorado. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and decided to prepare an EIS instead of completing the EA. Further information about the project is available on the project website. EIS-0400-DEIS-2012.pdf More Documents & Publications EIS-0400: Final Environmental Impact Statement EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement

415

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

416

EA-1862: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9/3/11 Submit comments to: Melissa Rossiter DOE Golden Field Office 1617 Cole Blvd Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce under the State Energy Program (SEP). Wisconsin selected an Oneida Seven Generations Corporation (Oneida) project to receive a $2 million loan under the SEP. The Bureau of Indian Affairs (BIA), an agency of the Department of the Interior (DOI), has already provided $584,000 in Federal funding to Oneida for this project. BIA is also considering providing a loan guarantee of up to $19 million. BIA made

417

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

418

Energia Sierra Juarez U.S. Transmission Line Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement Summary August 2010 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Department of Energy Washington, DC 20585 August 2010 Dear Sir/Madam: Enclosed for your review and comment is the Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0414), prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The County of San Diego, California, is a cooperating agency in the preparation of this Draft EIS.

419

EA-1823: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1823: Draft Environmental Assessment Rockford Solar Energy Project, Chicago-Rockford Airport, Winnebago County, Illinois For more information contact: Mr. John Jediny, NEPA Document Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Telephone: 202-287-5380 Fax: 202-340-9260 Electronic mail: John.Jediny@ee.doe.gov Public Hearing: Date: Monday, October 24, 2011; Time: 4 p.m. to 7 p.m. Location: Auditorium at the Offices of the Greater Rockford Airport Authority, 60 Airport Drive, Rockford, Illinois, 61109 DOE's proposed action would authorize Federal funding to the Illinois Department of Commerce and Economic Opportunity under the State Energy Program.

420

EA-1697: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1697: Draft Environmental Assessment Right-of-Way Maintenance in the San Joaquin Valley, California The Western Area Power Administration (Western) Sierra Nevada Region is a power marketing administration of the U.S. Department of Energy (DOE). As a Federal entity, Western is responsible for examining the potential environmental consequences of its proposed actions prior to making a decision or commitment to implement an action (see Section 1.5 for more information). This Environmental Assessment (EA) evaluates environmental impacts of the Proposed Action (San Joaquin Valley Right-of-Way Maintenance Project) and the No Action Alternative. EA-1697-DEA-2010.pdf More Documents & Publications EA-1697: Final Environmental Assessment

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EA-1947: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri The National Nuclear Security Administration (NNSA) is preparing this Environmental Assessment (EA) to evaluate the potential environmental impacts of transferring the Kansas City Plant (KCP) to one or more entities for a use that is different from its current use. Transfer includes sale or lease of the property in whole or in part. This EA will provide NNSA with the information needed to make an informed decision about the transfer of the KCP property, which is on the Bannister Federal Complex (BFC) located within the city limits of Kansas City, Missouri. NNSA believes the transfer of this property would benefit NNSA and the local economic area.

422

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Draft Environmental Impact Statement 03: Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

423

EA-1855: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

424

EA-1769: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1769: Draft Environmental Assessment Battleground Energy Recovery Project Harris County, Texas The proposed project is consistent with DOE's goal of increased use of energy efficiency and renewable energy generation projects. The proposed project involves installation of a specifically designed waste heat recovery boiler on the existing kiln afterburner of an incineration unit at the CHDP facility. This boiler would use heat from the incinerator flue gases to generate high pressure superheated steam. The adjacent Dow Chemical plant would periodically consume part of the steam for process needs, replacing natural gas firing of existing boilers. The majority of the steam, however, would be piped to a new steam turbine-generator (STG).

425

DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Draft Strategic Plan for Reducing Greenhouse Gas Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology September 22, 2005 - 10:45am Addthis WASHINGTON, DC - The Department of Energy today released for public review and comment a plan for accelerating the development and reducing the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions - the technology component of a comprehensive U.S. approach to climate change. The technologies developed under the Climate Change Technology program will be used and deployed among the United States' partners in the Asia-Pacific Partnership for Clean Development that was announced earlier this year.

426

EA-1885: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1885: Draft Environmental Assessment Boston Architectural College's (BAC) Urban Sustainability Initiative for the Renovation of Public Alley #444, Boston, MA (December 2011) DOE prepared this EA to evaluate the potential environmental consequences of providing a $1.6 million grant to Boston Architectural College (BAC) for its Urban Sustainability Initiative for the Renovation of Public Alley #444. The financial assistance proposed would be in the form of cost-shared funding, based on a FY2010 congressional earmark. This EA analyzes the potential environmental impacts of DOE's proposed action of providing the grant funding and of the No-Action Alternative. EA-1885-DEA-2011.pdf EA-1885-DearReaderLetter-2011.pdf More Documents & Publications

427

EA-1863: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1863: Draft Environmental Assessment Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest Flagstaff, Arizona Comment Period Ends: 12/29/11 For more information, contact: Ms. Linette King Electronic mail: lking@wapa.gov The Glen Canyon to Pinnacle Peak 345 kV vegetation management and right-of-way maintenance project (Project) serves to update the existing operation and maintenance program to include all transmission facilities and access roads into one comprehensive and proactive vegetation management and right-of-way maintenance program (Program). This environmental assessment (EA) analyzes the potential environmental consequences of the proposed Project, as required under the National

428

EIS-0395: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio Colorado (SLRC) Power Center, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company's (APS') North Gila Substation. The Proposed Project would require an expansion of Gila Substation and additional equipment at North Gila Substation; all of the proposed transmission components would be located in Yuma County, Arizona. Depending on the route ultimately selected, the total length of the 500-kV transmission system within the United States would be approximately 25.7 miles-21 miles from the United States-Mexico border to Gila Substation

429

EA-1944: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1944: Draft Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV This EA evaluates a proposal by Ormat Technologies, Inc. (Ormat) to use DOE and cost share funding to study the Brady Hot Springs geothermal Field 15-12RD well. This is an EGS Demonstration project divided into three phases. During Phase 1, Ormat characterized the target well to prepare for stimulation activities in Phase 2, Phase 2: Well Stimulation and Collection/Analysis of Stimulation Monitoring Data and Phase 3: Long-term testing of the system. Phase 2 and 3 activities would occur at Ormat's Brady Hot Springs geothermal field in Churchill County, NV on public lands managed by the Bureau of Land Management (BLM) and Bureau of Reclamation

430

EA-1949: FERC Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. EA-1949-FERC-DEA-2013.pdf More Documents & Publications EA-1949: FERC Notice of Availability of an Environmental Assessment EA-1949: FERC Final Environmental Assessment

431

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

432

EA-1640: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1640: Draft Environmental Assessment Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee The proposed action evaluated in this Environmental Assessment (EA) is the conveyance (lease, easement, and/or title transfer) of U. S. Department of Energy (DOE) property located at the East Tennessee Technology Park (ETTP) and surrounding area for mixed use economic development. Leases, easements, and/or title transfers could be entered into with the Community Reuse Organization of East Tennessee (CROET), city of Oak Ridge, other agencies, or private entities. Environmental Assessment for Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee,

433

EA-1599: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

599: Draft Environmental Assessment 599: Draft Environmental Assessment EA-1599: Draft Environmental Assessment Disposition of Radioactively Contaminated Nickel Located at the East Tennessee Technology Park, Oak Ridge, Tennessee, and the Paducah Gaseous Diffusion Plant, Paducah, Kentucky The U.S. Department of Energy (DOE or the Department) proposes the disposition (that is, sale, transfer, grant, or disposal) of approximately 15,300 tons (13,800 metric tons) of nickel metal scrap DOE has recovered from equipment it used in the uranium enrichment processes at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, Kentucky, and the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, where DOE currently stores the nickel. Environmental Assessment Disposition of Radioactively Contaminated Nickel

434

EA-1581: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Draft Environmental Assessment 81: Draft Environmental Assessment EA-1581: Draft Environmental Assessment Sand Hills Wind Energy Facility Albany County, Wyoming WindEnergy, Inc. (SWE or applicant) submitted a request to the U.S. Department of the Interior, Bureau of Land Management (BLM), Rawlins Field Office for a right-of-way (ROW) on BLM-administered lands (Proposed Action). SWE proposes to construct, operate, and maintain the Sand Hills Wind Energy Facility (Facility) in Albany County, Wyoming. The Facility, which would be located approximately 30 miles west of Laramie, would have an aggregate nominal nameplate generating capacity of up to 50 megawatts (MW) of electricity and would include up to 25, 2.0-MW wind turbines.This Environmental Assessment (EA) has been prepared to analyze the

435

EIS-0310: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Draft Programmatic Environmental Impact Statement 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these responsibilities, DOE maintains nuclear infrastructure capabilities that support various missions. Current estimates for the future needs of medical and industrial isotopes, plutonium-238, and research requirements indicate that the current infrastructure may soon be insufficient to meet the projected demands. DOE proposes to enhance these

436

EA-1939: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Draft Environmental Assessment 9: Draft Environmental Assessment EA-1939: Draft Environmental Assessment Center for Commercialization of Electronic Technology, Reese Technology Center Wind and Battery Integration Project, Lubbock County, TX This EA evaluates the potential environmental consequences of providing a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. 115) to the Center for Commercialization of Electric Technology to demonstrate battery technology integration with wind generated electricity by deploying and evaluating utility-scale lithium battery technology to improve grid performance and thereby aid in the integration of wind generation into the local electricity supply. EA-1939-DEA-2012.pdf More Documents & Publications

437

EIS-0287: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0287: Draft Environmental Impact Statement Idaho High-Level Waste & Facilities Disposition This EIS evaluates the potential environmental impacts of managing two waste types at the Idaho National Engineering and Environmental Laboratory, namely, high-level waste in a calcine form and liquid mixed transuranic waste (historically know as sodium bearing waste and newly generated liquid waste). It also analyzes the disposition of existing and proposed high-level waste facilities after their missions have been completed. EIS-0287-DEIS-1999.pdf EIS-0287-DEIS-Figures-1999.pdf More Documents & Publications EIS-0287: Final Environmental Impact Statement EIS-0287: Idaho High-Level Waste and Facilities Disposition Final

438

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

439

EIS-0360: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed DUF6 conversion facility at three

440

EA-1640: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1640: Draft Environmental Assessment EA-1640: Draft Environmental Assessment EA-1640: Draft Environmental Assessment Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee The proposed action evaluated in this Environmental Assessment (EA) is the conveyance (lease, easement, and/or title transfer) of U. S. Department of Energy (DOE) property located at the East Tennessee Technology Park (ETTP) and surrounding area for mixed use economic development. Leases, easements, and/or title transfers could be entered into with the Community Reuse Organization of East Tennessee (CROET), city of Oak Ridge, other agencies, or private entities. Environmental Assessment for Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee,

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

442

EIS-0305: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Impact Statement 5: Draft Environmental Impact Statement EIS-0305: Draft Environmental Impact Statement Treating Transuranic/Alpha Low-Level Waste at the Oak Ridge National Laboratory This EIS evaluates the potential environmental impacts of a proposal to construct, operate, and decontaminate/decommission a TRU Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-levelwaste solids. The mixed sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste.

443

EA-1752: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

52: Draft Environmental Assessment 52: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

444

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

445

EIS-0440: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0440: Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment (November 2011) Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and

446

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

447

Tapping Top University Draft Picks to Engineer Solar Championships |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping Top University Draft Picks to Engineer Solar Championships Tapping Top University Draft Picks to Engineer Solar Championships Tapping Top University Draft Picks to Engineer Solar Championships February 2, 2012 - 3:03pm Addthis The Office of Energy Efficiency and Renewable Energy offers a variety of internships, fellowships, and scholarships in addition to the postdoctoral research awards. Current SunShot fellows pose in front of the Apollo Lunar Module at the National Air and Space Museum. | Energy Department file photo. The Office of Energy Efficiency and Renewable Energy offers a variety of internships, fellowships, and scholarships in addition to the postdoctoral research awards. Current SunShot fellows pose in front of the Apollo Lunar Module at the National Air and Space Museum. | Energy Department file

448

Microsoft Word - 2014 Annual Plan DRAFT 9-5-13  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Annual Plan 4 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress Draft September 2013 United States Department of Energy Washington, DC 20585 Department of Energy |Draft September 2013 Department of Energy |Draft September 2013 Executive Summary This 2014 Annual Plan is the eighth research plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research Program since the launch of the program in 2007. This plan reflects the program's focus on safety and environmental sustainability that was initiated in the 2013 plan, and is consistent with the President's Office of Management and Budget directive for research that has significant potential public benefits.

449

EIS-0344: Draft Envrionmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Draft Envrionmental Impact Statement 4: Draft Envrionmental Impact Statement EIS-0344: Draft Envrionmental Impact Statement Grand Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project. Bonnewille Power Administration (BPA) would construct a new 500-kilovolt (kV) transmission line that would replace a single-circuit 115-kV transmission line in an exisiting corridor that has multiple transmission lines for most of the project's length. The transmission line would extend between the Grand Coulee 600-kV Switchyard and Bell Substation near Spokane, a distance of 84 miles. Detailed information about the project and its environmental impacts

450

EA-1921: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1921: Draft Environmental Assessment The Bureau of Land Management (BLM)(lead agency) and DOE are jointly preparing this EA, which evaluates the potential environmental impacts of a project proposed by Rockwood Lithium Inc (Rockwood), formerly doing business as Chemetall Foote Corporation. Rockwood has submitted to the BLM, Tonopah Field Office, an Operations Plan for the construction, operation, and maintenance of the Silver Peak Area Geothermal Exploration Project within Esmeralda County, Nevada. The purpose of the project is to determine subsurface temperatures, confirm the existence of geothermal resources, and confirm the existence of a commercial geothermal reservoir at the proposed well sites within federal geothermal lease N-87008. The proposed project

451

EIS-0319: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

319: Draft Environmental Impact Statement 319: Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated relocateing the TA-18 security Category I/II capabilities and materials to new locations: 1) different site at LANL (the preferred alternative) at Los Alamos, New Mexico; 2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; 3) the Nevada Test Site near Las Vegas; and 4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS analyzes upgrading of the TA-18 facilities at LANL. EIS-0319-DEIS-2001.pdf More Documents & Publications EIS-0319: Final Environmental Impact Statement EIS-0319: Record of Decision EIS-0236-S4: Final Supplemental Programmatic

452

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

453

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S1: Draft Supplemental Programmatic Environmental Impact S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement EIS-0236: Record of Decision DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

454

EA-1895: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Assessment 5: Draft Environmental Assessment EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis. EA-1895-DEA-2013.pdf More Documents & Publications

455

EIS-0378: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to Bonneville Power Administration (BPA), another organizational unit within DOE, for interconnection into the federal transmission system. EIS-0378-DEIS-Summary-2007.pdf

456

EA-1642S: Supplemental Draft Environmental Assessment | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky This EA evaluates the potential environmental impacts of DOE providing financial assistance to the University of Kentucky (UK) Center for Applied Energy Research (CAER) to partially fund the completion of the design, construction and operation of a small-scale pilot plant for research related to the gasification of coal and coal-biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch (FT) synthesis. This project is intended to evaluate the commercial and technical viability of

457

EA-1860: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

458

EA-1916: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1916: Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 On September 1, 2011, Ocean Renewable Power Company Maine, LLC (ORPC Maine) filed an application for an 8-year pilot license to construct and operate its proposed Cobscook Bay Tidal Energy Project (Cobscook Bay Project or project). The 300-kilowatt (kW) hydrokinetic project would be located in Cobscook Bay in Washington County, Maine. The project would not be located on federal lands. The proposed Cobscook Bay Project would use the tidal currents of Cobscook Bay to generate electricity via cross-flow Kinetic System turbine generator units (TGU) mounted on the seafloor. The TGUs would capture

459

EA-1829: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 3610 Morgantown, WV 26507-0880 Electronic mail: Jesse.Garcia@netl.doe.gov The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost

460

EIS-0288: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0288: Draft Environmental Impact Statement This Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (CLWR EIS) evaluates the environmental impacts associated with producing tritium at one or more of the following five CLWRs: (1) Watts Bar Nuclear Plant Unit 1 (Spring City, Tennessee); (2) Sequoyah Nuclear Plant Unit 1 (Soddy Daisy, Tennessee); (3) Sequoyah Nuclear Plant Unit 2 (Soddy Daisy, Tennessee); (4) Bellefonte Nuclear Plant Unit 1 (Hollywood, Alabama); and (5) Bellefonte Nuclear Plant Unit 2 (Hollywood, Alabama). Specifically, this EIS analyzes the potential environmental impacts associated with fabricating tritium-producing burnable absorber rods (TPBARs); transporting nonirradiated TPBARs from the

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EA-1752: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

752: Draft Environmental Assessment 752: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

462

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

463

EIS-0374: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike III/Biglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. EIS-0374-DEIS-Summary-2006.pdf EIS-0374-DEIS-2006.pdf EIS-0374-DEIS-commentextension-2005.pdf More Documents & Publications EIS-0374: Final Environmental Impact Statement EIS-0374: Notice of Extension of Comment Period EIS-0374: Record of Decision

464

EIS-0450: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0: Draft Environmental Impact Statement 0: Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. EIS-0450-DEIS-Volume1-2013.pdf EIS-0450-DEIS-Volume2-2013.pdf EIS-0450-DEIS-Volume3-2013.pdf EIS-0450-DEIS-Appendices_A-H-2013.pdf More Documents & Publications

465

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

466

EIS-0418: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project, Deer Creek Station Energy Facility Project, Brookings County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to provide interconnection services, and Rural Utilities Service (RUS) proposes to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility. The facility is being proposed to meet projected intermediate demands for electricity in the eastern portion of Basin Electric Power Cooperative's service territory, as determined from a power supply analysis. Basin Electric's alternatives analysis included alternative power generation

467

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36-S1: Draft Supplemental Programmatic Environmental Impact 36-S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

468

EA-1860: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

469

EIS-0250-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2D) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

470

EA-1617: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

471

EIS-0460: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. EIS-0460-DEIS-Summary-2013.pdf EIS-0460-DEIS-Volume_I-2013.pdf EIS-0460-DEIS-Volume_II-2013.pdf More Documents & Publications

472

DOE Draft Standard, Development and Use of Probabilistic Risk Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Standard, Development and Use of Probabilistic Risk Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 12/10 DOE Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 12/10 The Department has taken several actions to provide an infrastructure for providing appropriate controls and support for use of risk assessments and risk informed decision making as it applies to nuclear safety including establishing a Risk Assessment Technical Experts Working Group, revising its Nuclear Safety Policy to explicitly address the use and control of risk assessments, and developing this DOE Technical Standard for Control and Use of Probabilistic Risk Assessment for interim use and comment.1

473

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Draft Supplemental Environmental Assessment 3: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

474

EIS-0391: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0391: Draft Environmental Impact Statement Tank Closure and Waste Management for the Hanford Site, Richland, WA Abstract: The Hanford Site (Hanford), located in southeastern Washington State and situated along the Columbia River, is approximately 1,518 square kilometers (586 square miles) in size. Hanford's mission from the early 1940s to approximately 1989 included defense-related nuclear research, development, and weapons production activities. These activities created a wide variety of chemical and radioactive wastes. Hanford's mission now is focused on the cleanup of those wastes and ultimate closure of Hanford. To this end, several types of radioactive waste are being managed at Hanford: (1) high-level radioactive waste (HLW) as defined in DOE Manual

475

EIS-0473: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial assistance to NRG under the Clean Coal Power Initiative (CCPI) Program to support construction and operation of NRG's Parish PCCS Project . EIS-0473-DEIS-Summary-2012.pdf EIS-0473-DEIS-VolumeI-2012.pdf EIS-0473-DEIS-VolumeII-AppendicesA-B-2012.pdf EIS-0473-DEIS-VolumeII-AppendixC-Part1-2012.pdf

476

EA-1901: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Assessment 1: Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to support the Kootenai Tribe of Idaho's construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort. EA-1901-DEA-2013.pdf More Documents & Publications EA-1901: Final Environmental Assessment EA-1901: Finding of No Significant Impact EA-1901: Mitigation Action Plan

477

EA-1812: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado For more information, contact: Ms. Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, Colorado 80401 Electronic mail: melissa.rossiter@go.doe.gov DOE is proposing to authorize the expenditure of Federal funding through the Community Renewable Energy Deployment Program to Phillips County for design, permitting, and construction of an approximately 30-megawatt wind energy project, known as Haxtun Wind Project, within Phillips and Logan counties in northeastern Colorado. The proposed project consists of 18 wind turbines that would interconnect to the Highline Electric Cooperative equipment inside Western Area Power Administration's Haxtun substation just

478

NETL: News Release - Clean Coal Power Initiative Draft Solicitation  

NLE Websites -- All DOE Office Websites (Extended Search)

November 26, 2003 November 26, 2003 Clean Coal Power Initiative Draft Solicitation Available for Comment Round 2 Demonstrations to Advance the Use of the Nation's Most Abundant Energy Resource WASHINGTON, DC - The U.S. Department of Energy's National Energy Technology Laboratory (NETL) developed a draft solicitation (Solicitation No. DE-PS26-04NT42061) for public comment to continue its efforts under the Clean Coal Power Initiative (CCPI). MORE INFO View the draft CCPI solicitation NETL is conducting a comment-and-response period that extends through December 26, 2003. Input from interested parties will be used to prepare the final solicitation. Final issuance of the solicitation is anticipated on or about January 16, 2004, with selections expected toward the end of 2004.

479

EIS-0397: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to habitat in the upper part of the watershed. Funding from BPA would serve to provide off-site mitigation for the effects of the federal Columbia River hydroelectric facilities on fish populations by improving fish passage at Lyle Falls. While the fish passage issues at Lyle Falls were not caused by the hydroelectric facilities, this project would help BPA meet its mitigation responsibilities and potentially increase overall fish production in the Columbia Basin by enhancing fish passage into the Klickitat subbasin. EIS-0397-DEIS-Summary-2008.pdf EIS-0397-DEIS-2008.pdf More Documents & Publications

480

EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. This CMRR-NF SEIS examines the potential environmental impacts associated with NNSA's proposed

Note: This page contains sample records for the topic "draft ulp peis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1870: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this Environmental Assessment (EA) to evaluate the potential impacts of providing financial assistance to Viresco Energy, LLC, (Viresco) for its construction and operation of a Coal and Biomass Fueled Pilot Plant, that would be located in Kanab, Utah. The plant would be located on land leased to Viresco by the Utah School and Institutional Trust Lands Administration. The Pilot Plant would occupy approximately 1.5 acres of a 10-acre site located approximately 2.5 miles south of the downtown area of Kanab, Utah. EA-1870-DEA-2011d_0.pdf More Documents & Publications EA-1870: Finding of No Significant Impact

482

EA-1851: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1851: Draft Environmental Assessment Delphi Automotive Systems, LLC, Electric Drive Vehicle Battery and Component Manufacturing Initiative For more information, contact: Ms. Pierina Fayish U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, MS: 922-M217 Pittsburgh, PA 15236 Fax: 412-386-4775 Electronic mail: pierina.fayish@netl.doe.gov DOE prepared this EA to evaluate the potential environmental consequences of providing a financial assistance grant under the American Recovery andReinvestment Act of 2009 (ARRA) to Delphi Automotive Systems, Limited Liability Corporation (LLC) (Delphi). Delphi proposes to construct a laboratoryreferred to as the "Delphi Kokomo, IN Corporate Technology Center" (Delphi CTC Project) and retrofit a manufacturing facility. The

483

EA-1778: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1778: Draft Environmental Assessment Proposed Rule, 10 CFR Part 433: Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings and 10 CFR Part 435, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Low-Rise Residential Buildings". This EA evaluates the environmental impacts of of DOE's Proposed Rule, 10 CFR Part 433, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings" and

484

EA-1665: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1665: Draft Environmental Assessment Davis-Kingman Tap 69-kV Transmission Line Rebuild, Mohave County, Arizona This Environmental Assessment (EA) evaluates the probable and known impacts to the environment from Western's Proposed Action, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with National Environmental Policy Act (NEPA) regulations published by the Council on Environmental Quality (CEQ) (40 CFR 1500-1508) and implementing procedures of DOE (10 CFR 1021). Western is the lead federal agency responsible for preparing the EA. The Department of Interior's (DOI) Bureau of Land Management (BLM) Kingman Field Office and Reclamation's Lower Colorado Regional Office are cooperating

485

EA-1793: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Draft Environmental Assessment 3: Draft Environmental Assessment EA-1793: Draft Environmental Assessment Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site The U.S. Department of Energy (DOE) proposes to provide replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Historically, INL has disposed of this LLW onsite. However, the existing disposal area located within the INL Radioactive Waste Management Complex will undergo closure as part of ongoing cleanup of INL and will not be available after 2017. The proposed project to establish replacement capability is not a DOE Environmental Management Idaho Cleanup Project

486

Draft Nevada National Security Site Environmental Impact Statement Released  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Environmental Impact Statement Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada is available for public review and comment through October 27, 2011. Within the draft SWEIS, the U.S. Department of Energy, National Security Administration Nevada Site Office presents a formal analysis of how current and potential missions at the NNSS (formerly the Nevada Test Site) and related off-site locations may affect the environment over the next ten

487

EIS-0353: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana EIS No. 040274, Draft EIS, DOE, MT, South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Preserve the Genetic Purity of the Westslope Cutthroat Trout Population, Flathead National Forest, Flathead River, Flathead, Powell and Missoula Counties, Montana DOE/EIS-0353 Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana, 69 FR 34161 (June 2004) More Documents & Publications

488

EA-1792: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Assessment EA-1792: DOE Notice of Availability of the Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This draft EA to evaluate and describe the potential environmental impacts associated with the: University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine. Notice of Availability of the Draft Environmental Assessment for the University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine, DOE/EA-1792 (June 2011) More Documents & Publications EA-1792: DOE Notice of Availability of the Environmental Assessment and Finding of No Significant Impact

489

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement

490

Microsoft Word - Draft Minutes NERAC Feb 2007.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Minutes Draft Minutes Nuclear Energy Research Advisory Committee Meeting February 20-21, 2007 Bennion Student Union Idaho State University/University of Idaho Idaho Falls, Idaho Committee Members Participating John Ahearne, Vice Chair, via telephone, Wednesday morning only Michael Corradini, all day Tuesday and Wednesday morning only Jose Luis Cortez, all day Tuesday and Wednesday morning only Robert Long William Martin, Chair Sekazi Mtingwa, via telephone, Tuesday only Harold Ray Alan Sessoms, via telephone, all day Tuesday and Wednesday morning only Neil Todreas Committee Members Absent Thomas Cochran Marvin Fertel Steve Fetter Marilyn Kray Michael B. Sellman Other Participants: John Boger, Designated Federal Official, Office of Nuclear Energy, USDOE

491

DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03 03 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 i September 2013 ACRONYMS AND ABBREVIATIONS BMPs best management practices CEQ Council on Environmental Quality CFR Code of Federal Regulations DASR digital airport surveillance radar dB decibel dBA decibel A-weighted

492

ENERGY STAR Enterprise Storage Draft Specification Framework  

E-Print Network (OSTI)

This document describes the key building blocks that form the basis for every ENERGY STAR specification; these items are intended to provide the framework around which the EPA can develop an effective energy efficiency program for Enterprise Storage. The principal objectives for this ENERGY STAR specification are threefold: (1) to encourage widespread adoption of appropriate hardware and software strategies to improve energy efficiency in enterprise storage systems, (2) to provide purchasers with the means to identify the most energy efficient enterprise storage solutions for their specific end-use application, and (3) to provide tools and information to designers and mangers looking to improve the efficiency of data center operations. The purpose of each building block is provided under the subheadings below, along with EPAs preliminary thoughts on how each may ultimately be incorporated into the Version 1.0 Enterprise Storage specification. At the end of each section are a series of questions aimed at generating discussion about the proposed approach. Please note that this document is not intended to be a comprehensive review of the ENERGY STAR perspective on enterprise storage, rather it serves as a starting point for EPAs specification development efforts. Stakeholders are encouraged to provide feedback on the specific concepts and definitions presented in this document, and are also welcome to submit comments of a more general nature. Communication between EPA and industry stakeholders is critical to the success of the ENERGY STAR program, especially in this early stage of the specification development process. Any and all creative suggestions for improvements to the basic ENERGY STAR approach outlined in this document will be considered for inclusion in subsequent draft and final specifications. ENERGY STAR representatives are available for additional technical discussions with interested parties at any time during the specification development process. Please contact Steve Pantano, ICF International, at

unknown authors

2009-01-01T23:59:59.000Z

493

PERFORMANCE ANALYSIS OF MECHANICAL DRAFT COOLING TOWER  

SciTech Connect

Industrial processes use mechanical draft cooling towers (MDCT's) to dissipate waste heat by transferring heat from water to air via evaporative cooling, which causes air humidification. The Savannah River Site (SRS) has cross-flow and counter-current MDCT's consisting of four independent compartments called cells. Each cell has its own fan to help maximize heat transfer between ambient air and circulated water. The primary objective of the work is to simulate the cooling tower performance for the counter-current cooling tower and to conduct a parametric study under different fan speeds and ambient air conditions. The Savannah River National Laboratory (SRNL) developed a computational fluid dynamics (CFD) model and performed the benchmarking analysis against the integral measurement results to accomplish the objective. The model uses three-dimensional steady-state momentum, continuity equations, air-vapor species balance equation, and two-equation turbulence as the basic governing equations. It was assumed that vapor phase is always transported by the continuous air phase with no slip velocity. In this case, water droplet component was considered as discrete phase for the interfacial heat and mass transfer via Lagrangian approach. Thus, the air-vapor mixture model with discrete water droplet phase is used for the analysis. A series of parametric calculations was performed to investigate the impact of wind speeds and ambient conditions on the thermal performance of the cooling tower when fans were operating and when they were turned off. The model was also benchmarked against the literature data and the SRS integral test results for key parameters such as air temperature and humidity at the tower exit and water temperature for given ambient conditions. Detailed results will be published here.

Lee, S; Alfred Garrett, A; James02 Bollinger, J; Larry Koffman, L

2009-02-10T23:59:59.000Z

494

Dampers for Natural Draft Heaters: Technical Report  

Science Conference Proceedings (OSTI)

Energy required for water heating accounts for approximately 40percent of national residential natural gas consumption in California. With water heating contributing such a substantial portion of natural gas consumption, it is important to pay attention to water heater efficiencies. This paper reports on an investigation of a patented, buoyancy-operated flue damper. It is an add-on design to a standard atmospherically vented natural-draft gas-fired storage water heater. The flue damper was expected to reduce off-cycle standby losses, which would lead to improvements in the efficiency of the water heater. The test results showed that the Energy Factor of the baseline water heater was 0.576. The recovery efficiency was 0.768. The standby heat loss coefficient was 10.619 (BTU/hr-oF). After the damper was installed, the test results show an Energy Factor for the baseline water heater of 0.605. The recovery efficiency was 0.786. The standby heat loss coefficient was 9.135 (BTU/hr-oF). The recovery efficiency increased 2.3percent and the standby heat loss coefficient decreased 14percent. When the burner was on, the baseline water heater caused 28.0 CFM of air to flow from the room. During standby, the flow was 12.4 CFM. The addition of the damper reduced the flow when the burner was on to 23.5 CFM. During standby, flow with the damper was reduced to 11.1 CFM. The flue damper reduced off-cycle standby losses, and improved the efficiency of the water heater. The flue damper also improved the recovery efficiency of the water heater by restricting on-cycle air flows through the flue.With or without the flue damper, off-cycle air flow upthe stack is nearly half the air flow rate as when the burner is firing.

Lutz, James D.; Biermayer, Peter; King, Derek

2008-10-27T23:59:59.000Z

495

Draft Do not cite or quote Draft To appear in Erickson, T. and McDonald, D.W. (eds.). HCI Remixed: Essays on  

E-Print Network (OSTI)

Draft ­ Do not cite or quote ­ Draft To appear in Erickson, T. and McDonald, D.W. (eds.). HCIDonald, D.W. (eds.). HCI Remixed: Essays on Works that have Influenced the HCI Community. MIT Press, 2007. 2 ­ Do not cite or quote ­ Draft To appear in Erickson, T. and McDonald, D.W. (eds.). HCI Remixed: Essays

McDonald, David W.

496

NETEX Test Master Plan Draft 8/15/02  

E-Print Network (OSTI)

NETEX Test Master Plan Draft 8/15/02 1 The Defense Advanced Research Projects Agency (DARPA) Networking in Extreme Environments (NETEX) Program TEST MASTER PLAN FOR THE NETEX PROGRAM 1.0 INTRODUCTION This document provides a plan for testing a number of selected military systems to determine the susceptibility

Buehrer, R. Michael

497

Results of IEC 62804 Draft Round Robin Testing (Presentation)  

Science Conference Proceedings (OSTI)

Three crystalline silicon module designs were distributed in five replicas each to five laboratories for testing according to the IEC 62804 (Committee Draft) system voltage durability qualification test for crystalline silicon photovoltaic (PV) modules. The stress tests were performed in environmental chambers at 60 degrees C, 85% relative humidity, 96 h, and with module nameplate system voltage applied.

Hacke, P.; Terwilliger, K.; Koch, S.; Weber, T.; Berghold, J.; Hoffmann, S.; Koehl, M.; Dietrich, S.; Mathiak, G.; Ebert, M.

2013-09-01T23:59:59.000Z

498

Plaquemines parish Deep Draft top-off terminal  

SciTech Connect

The recently completed ''Deep River Study, Lower Mississippi River'' sponsored by the ''Governor's Task Force on Deep-Draft Vessel Access to the Lower Mississippi River'' contained the following recommended program: Dredge the present 40 foot deep channel to 45 feet initially from the Gulf via Southwest Pass to Mile 172 AHP to provide for two-way navigation of the deep draft vessels that would serve the forecasted most likely level of waterborne commerce (Alternative 9). Plan and seek authorization to further deepen the channel in stages to 55 feet in the future should actual increases in commerce equal the high level level of commerce (Alternative 11). Put into operation, as soon as possible, facilities for loading and topping-off grain ships midstream and topping-off coal carriers in the Gulf in order to attract and establish patterns of trade in large ships. The South Pass Bulk Terminal is a project that responds to the last section of this three-part recommendation. It was conceived as a means of providing the Gulf Coast region with low cost and efficient access to the economics of scale offered by using deep-draft vessels for ocean transport of dry bulk commodities. The proposed facility seeks to combine the advantages of a deep-draft port with those typical of a topping-off operation. It is intended as an interim measure that will serve to maintain and attract trade until such time as the river is dredged.

Nelson, C.; Morehiser, M.

1983-11-01T23:59:59.000Z

499

Co~uter Aided Design/Drafting Development Recommendation  

E-Print Network (OSTI)

Operators The effectiveness level that we have been assuming during the design and cost estimation process for the pro- ject would be based on modern Computer-Aided Design/Drafting (CAD) equipment. The reasons and justification for this assumption are many and varied and include the following: 1. It represents a cost

Kemner, Ken

500

Design and Specification Guidelines for Large Draft Fans and Systems  

Science Conference Proceedings (OSTI)

Design shortcomings in draft fans and related air-gas systems can cause fan failure and costly outages of large fossil fuel power plants. These guidelines will help engineers and manufacturers achieve a better understanding of the design features needed to minimize such failures.

1983-12-01T23:59:59.000Z