1

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

2

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

3

EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: DOE Notice of Availability of the Draft Supplement 60: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, Clive, Utah The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low- level radioactive waste disposal facility at the Nevada Test Site (NTS) or at EnergySolutions LLC, a commercial low-level waste disposal facility in Clive, Utah (EnergySolutions; formerly known as Envirocare of Utah, Inc.). DOE/EIS-0360, Department of Energy, Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride,

4

EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Supplement DOE Notice of Availability of the Draft Supplement Analysis EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low-level radioactive waste disposal facility at the Nevada Test Site (NTS) or at EnergySolutions LLC, a commercial low-level waste disposal facility in Clive, Utah (EnergySolutions; formerly known as Envirocare of Utah, Inc.). DOE/EIS-0359, Department of Energy, Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, 72

5

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

6

Draft Supplement Analysis for Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE'S Inventory of Depleted Uranium Hexafluoride  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED URANIUM OXIDE CONVERSION PRODUCT GENERATED FROM DOE'S INVENTORY OF DEPLETED URANIUM HEXAFLUORIDE (DOE/EIS-0359-SA1 AND DOE/EIS-0360-SA1) March 2007 March 2007 i CONTENTS NOTATION........................................................................................................................... iv 1 INTRODUCTION AND BACKGROUND ................................................................. 1 1.1 Why DOE Has Prepared This Draft Supplement Analysis .............................. 1 1.2 Background ....................................................................................................... 3 1.3 Proposed Actions Considered in this Draft Supplement Analysis.................... 4

7

EIS-0236-SA6; Draft Supplemental Analysis: Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile, Stewardship  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/25/99 6/25/99 DRAFT SUPPLEMENT ANALYSIS: PIT MANUFACTURING FACILITIES AT LOS ALAMOS NATIONAL LABORATORY, STOCKPILE STEWARDSHIP AND MANAGEMENT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT June 1999 SUMMARY ............................................................................................................................... 3 INTRODUCTION ..................................................................................................................... 3 Purpose of this Document .................................................................................................................................. 3 Background - SSM PEIS ...................................................................................................................................

8

EIS-0288-S1: Draft Supplemental Environmental Impact Statement...  

Energy Savers (EERE)

Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft...

9

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact...  

Office of Environmental Management (EM)

Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the...

10

EIS-0451: Supplemental Draft Environmental Impact Statement ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an additional...

11

Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.  

SciTech Connect

This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

12

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Office of Environmental Management (EM)

a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental...

13

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

14

EA-1611-S1: Draft Supplemental Environmental Assessment | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a draft supplemental EA that...

15

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

16

SUPPLEMENT ANALYSIS  

NLE Websites -- All DOE Office Websites (Extended Search)

812 Supplement Analysis 1 October 2013 812 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Customer Service Region OCTOBER 2013 DOE/EA-1812/SA-1 DOE/EA-1812 Supplement Analysis 2 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration

17

SUPPLEMENT ANALYSIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis 1 October 2013 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Customer Service Region OCTOBER 2013 DOE/EA-1812/SA-1 DOE/EA-1812 Supplement Analysis 2 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration

18

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

19

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

20

EIS-0403-S1: Supplement to the Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0317-S1: Draft Supplemental Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

22

EIS-0288-S1: EPA Notice of Availability of Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of Draft Supplemental Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement...

23

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Energy Savers (EERE)

EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

24

EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental...  

Energy Savers (EERE)

33-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact...

25

EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...  

Energy Savers (EERE)

288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...

26

EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental...  

Energy Savers (EERE)

283-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact...

27

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...  

Energy Savers (EERE)

DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement...

28

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

29

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

30

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

31

Supplemental results of the human health risk analysis for the U.S. Department of Energy draft waste management programmatic environmental impact statement  

SciTech Connect

This report is intended as an information supplement to the human health risk analysis performed for the US Department of Energy`s Draft Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste, hereinafter called the PEIS. This report provides the installation-by-installation human health risk analysis results from which the risk estimate summaries for the PEIS were drawn. Readers should bear in mind that the risk estimates presented here are the result of a program-wide (as opposed to site-specific) study. They are based on best available data; systematically applied assumptions; and professional judgment about DOE waste inventories, waste volumes generated annually, currently available treatment and disposal technologies, technical limitations of treatment, and facility capacities across the numerous installations in the DOE complex.

NONE

1995-08-01T23:59:59.000Z

32

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S1: Draft Supplemental Programmatic Environmental Impact S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement EIS-0236: Record of Decision DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

33

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36-S1: Draft Supplemental Programmatic Environmental Impact 36-S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

34

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...  

Office of Environmental Management (EM)

Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft Long-Term Management...

35

EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental...  

Energy Savers (EERE)

DOE Notice of Availability of the Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings EIS-0236-S4: DOE Notice of Availability of the Draft...

36

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Draft Supplemental Environmental Assessment 3: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

37

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing a financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S.

38

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

39

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

40

EIS-0250: EPA Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Supplemental EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor EIS-0250-DEIS-EPANOA-S1S2-2nd-2007.pdf More Documents & Publications EIS-0357: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

42

EA-1642S: Supplemental Draft Environmental Assessment | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky This EA evaluates the potential environmental impacts of DOE providing financial assistance to the University of Kentucky (UK) Center for Applied Energy Research (CAER) to partially fund the completion of the design, construction and operation of a small-scale pilot plant for research related to the gasification of coal and coal-biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch (FT) synthesis. This project is intended to evaluate the commercial and technical viability of

43

EIS-0250-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2D) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

44

EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. This CMRR-NF SEIS examines the potential environmental impacts associated with NNSA's proposed

45

EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Supplemental DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition The U. S. Department of Energy (DOE) announces the availability of the Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS; DOE/EIS-0283-S2) for public comment. DOE also is announcing the dates, times and locations for pulic hearings to receive comments on the Draft SPD Supplemental EIS. The Draft SPD Supplemental EIS analyzes the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1

46

EIS-0348-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory, CA EIS-0348-SA-03a-2011.pdf EIS-0348-SA-03b-2011.pdf More Documents & Publications EIS-0348-SA-03: Supplement Analysis EIS-0380: Draft Site-Wide Environmental Impact...

47

Supplement Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington U. S. Department of Energy Richland Operations Office Richland, Washington 99352 July 20 10 This page intentionally left blank. SUMMARY In December 1992, the U.S. Department of Energy (DOE) issued the Final Environmental Impact Statement (EIS) on Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington (DOEIEIS-O119F). The Final EIS analyzed alternatives for decommissioning eight water-cooled, graphite-moderated plutonium-production reactors, located along the Columbia River in Washington State. The eight reactors (B, C, D, DR, F, H, KE and KW), operated between the years 1944 and 197 1, and have been retired from service. The alternatives analyzed in the EIS included the no-

48

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania The Department of Energy has prepared...

49

EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

50

EIS-0357: DOE Notice of Availability of the Supplement to the Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Supplement to the Draft DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement EIS-0357: DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft Environmental Impact Statement (EIS) issued in December 2005. This Supplement corrects information regarding carbon dioxide (CO2) emissions from the proposed Gilberton plant, provides information on the feasibility of carbon sequestration for the CO2 emissions from the Gilberton plant, and presents

51

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental  

NLE Websites -- All DOE Office Websites (Extended Search)

3-S1: DOE Notice of Availability of a Draft Supplemental 3-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement (Mercury Storage SEIS, DOE/EIS-0423-S1) for public comment. As required by the Mercury Export Ban Act of 2008, DOE plans to identify a facility or facilities for the long-term management and storage of elemental mercury generated in the U.S. Subsequently, DOE identified three additional, reasonable alternative locations in the vicinity of its Waste Isolation

52

EIS-0315-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5-SA-01: Supplement Analysis 5-SA-01: Supplement Analysis EIS-0315-SA-01: Supplement Analysis Big Sandy Energy Project In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS. Since June 2001, BLM and Western have received new information potentially relevant to the identified environmental concerns. Big Sandy Energy Project Supplement Analysis, DOE/EIS-0315-SA-01 (May 2002) More Documents & Publications EA-1853: Final Environmental Assessment EA-1665: Draft Environmental Assessment

53

EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor The Department of Energy (DOE or the Department) announces the availability of two draft National Environmental Policy Act (NEPA) documents related to its Yucca Mountain Project: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel

54

EA-1792-S1: DOE Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Finding of No Significant Impact

55

EIS-0236-S2: EPA Notice of Availability of the Draft Supplement to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S2: EPA Notice of Availability of the Draft Supplement to S2: EPA Notice of Availability of the Draft Supplement to the Programmatic Environmental Impact Statement EIS-0236-S2: EPA Notice of Availability of the Draft Supplement to the Programmatic Environmental Impact Statement Stockpile and Management for a Modern Pit Facility Construction and Operation Site Location: Savannah River Site, SC; Los Alamos Site, NM; Nevada Test Site; Carlsbad Site, NM; and Pantex Site, TX and Plutonium Pit Manufacturing Capabilities Upgrading at Los Alamos National Laboratory (LANL), NM. EIS-0236-S2; Environmental Protection Agency Environmental Impact Statements; Notice of Availability of the Draft Supplement for the Programmatic EIS-Stockpile and Management for a Modern Pit Facility (MPF) Construction and Operation (June 2003) More Documents & Publications

56

EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Notice of Availability of a Draft Supplemental 3-S1: Notice of Availability of a Draft Supplemental Environmental Assessment (DOE/EA-1887) EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental Assessment (DOE/EA-1887) Proposed Renewable Fule Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO DOE's Golden Field Office has prepared a draft Supplemental Environmental Assessment (SEA) for improvments to the Renewable Fuel Heat Plant (RFHP) NREL South Table Mountain site. The SEA and the RFHP EA are now available for public review. See DOE/EA-1573-S1. EA-1573D-S1-NOA-2012_0.pdf More Documents & Publications EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO

57

EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare a Supplemental Draft Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota Western Area Power Administration is evaluating the potential environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to Western's existing Wilton/Baldwin substation and allowing NextEra's existing wind projects in this area to operate above 50 annual MW. Western is preparing a Supplemental Draft EIS to address substantial changes to the proposal, including 30 turbine locations and 5 alternate turbine locations in Crofte Township.

58

EA-1173-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73-SA-01: Supplement Analysis 73-SA-01: Supplement Analysis EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to take additional data on summer steelhead that are trapped at the existing adult collection weirs on the upper Grande Ronde River and Catherine Creek. Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) (December 2003) More Documents & Publications EA-1173: Final Environmental Assessment EIS-0340: Draft Environmental Impact Statement

59

EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: EPA Notice of Availability of the Supplement to the -S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is EIS-0403D-S1. Comment Period Ends: 01/27/12 Comments may be submitted to: Solar Energy Draft PEIS Argonne National Laboratory 9700 S. Cass Avenue--EVS/240 Argonne, Illinois 60439 Web site: DOE and BLM recommend using the online comment form available on the project Web site: http://solareis.anl.gov. EIS-0403-DEIS_EPA_NOA-2011.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact

60

EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building.

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0423-S1: Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

62

EIS-0250-S1: Draft Supplemental Environmental Impact Statement...  

Office of Environmental Management (EM)

generated at 72 commercial and 4 DOE sites would be shipped to the repository by rail (train), although some shipments would arrive at the repository by truck. The Draft...

63

Supplement Analysis Plutonium Consolidation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-SA-4 9-SA-4 SUPPLEMENT ANALYSIS STORAGE OF SURPLUS PLUTONIUM MATERIALS AT THE SAVANNAH RIVER SITE INTRODUCTION AND PURPOSE In April 2002, DOE decided to immediately consolidate long-term storage at the Savannah River Site (SRS) of surplus, non-pit weapons-usable plutonium then stored at the Rocky Flats Environmental Technology Site (RFETS) (DOE, 2002a). That 2002 decision did not affect an earlier DOE decision made in the January 21, 1997, Record of Decision (ROD, DOE, 1997) for the Storage and Disposition of Weapons-Usable Fissile Materials Programmatic Environmental Impact Statement (Storage and Disposition PEIS, DOE, 1996) to continue storage of non-pit surplus plutonium at Hanford, the Idaho National Laboratory (INL), and the Los Alamos

64

EIS-0332-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0332-SA-01: Supplement Analysis McNary-John Day Transmission Line Project McNary-John Day Transmission Line - Review for significant new circumstances or information In 2002, Bonneville Power Administration (BPA) completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (February 2009) More Documents & Publications EIS-0332: Record of Decision EIS-0332: Draft Environmental Impact Statement EIS-0332: Mitigation Action Plan

65

EIS-0332-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

332-SA-01: Supplement Analysis 332-SA-01: Supplement Analysis EIS-0332-SA-01: Supplement Analysis McNary-John Day Transmission Line Project McNary-John Day Transmission Line - Review for significant new circumstances or information In 2002, Bonneville Power Administration (BPA) completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (February 2009) More Documents & Publications EIS-0332: Record of Decision EIS-0332: Draft Environmental Impact Statement EIS-0332: Final Environmental Impact Statement

66

DOE/EA-1792S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT Castine US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado January 2013 DOE/EA-1792S i Draft - January 2013 ACRONYMS AND ABBREVIATIONS CMP Central Maine Power CFR Code of Federal Regulations DMR Maine Department of Marine Resources DOE U.S. Department of Energy DPS distinct population segment EA environmental assessment EFH essential fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish aggregation device

67

Comments of the Independent Peer-Review Team for the Draft Interim Regional Supplement to the Corps of Engineers Wetland  

E-Print Network (OSTI)

Comments of the Independent Peer-Review Team for the Draft Interim Regional Supplement to the Corps individual reports were submitted by the four members of the Independent Peer-Review Team for the draft to the peer-review comments were developed by ERDC in cooperation with the Caribbean Islands working group

US Army Corps of Engineers

68

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

69

EIS-0236-SA-06: Draft Supplement Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management

70

EA-1723: Draft Supplemental Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiative Initiative DOE prepared this Supplemental EA to evaluate the potential environmental consequences of providing financial assistance in a cooperative agreement with General Motors Limited Liability Company (LLC) (General Motors Company or GM). A supplement to the April 2010 EA was necessary due to the proposed building size increasing three fold as well as the addition of a parking lot and widening of a truck dock area. This building size increase is necessary to accommodate more manufacturing equipment and provide office space. If GM received the funding, they would construct a high-volume U.S. manufacturing facility to produce the first U.S.-manufactured electric motor components and assemble electric drive units for hybrid and electric vehicles. This funding would be used for constructing a building of

71

SNL/CA Supplement Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22-SA-01 22-SA-01 Supplement Analysis for the Final Site-Wide Environmental Assessment for Sandia National Laboratories/California [September 2012] U.S. Department of Energy National Nuclear Security Administration Sandia Site Office This page intentionally left blank COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY/NATIONAL NUCLEAR SECURITY ADMINISTRATION TITLE: Supplement Analysis for the Final Site-Wide Environmental Assessment for Sandia National Laboratories/California (DOE/EA-1422-SA-01) CONTACT: For further information concerning this Supplement Analysis, contact Ms. Susan Lacy Environmental Team Leader Sandia Site Office National Nuclear Security Administration P. O. Box 5400, MS 0184 Albuquerque, New Mexico 87185-5400 Phone: (505) 845-5542

72

EIS-0283DS Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Sheet Responsible Agency: United States Department of Energy (DOE) Title: Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement (Supplement) (DOE/EIS-0283-DS) Locations of Candidate Sites: Idaho, North Carolina, South Carolina, Texas, Virginia, and Washington Contacts: For further information on the Supplement contact: For further information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Office of Fissile Materials Disposition U.S. Department of Energy P.O. Box 23786 Washington, DC 20026-3786 Voice: (202) 586-5368 Ms. Carol Borgstrom, Director Office of NEPA Policy and Assistance Office of Environment, Safety and Health U.S. Department of Energy 1000 Independence Ave., SW

73

EIS-0265-SA-100: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Supplement Analysis EIS-0265-SA-100: Supplement Analysis Oregon Fish Screening Project, Screen Replacements Supplement Analysis for the Watershed Management Program...

74

EIS-0312-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-03: Supplement Analysis EIS-0312-SA-03: Supplement Analysis Fish and Wildlife Implementation Plan The attached Supplement Analysis for Bonneville Power Administration's (BPA's)...

75

EIS-0312-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis EIS-0312-SA-01: Supplement Analysis Fish and Wildlife Implementation Plan Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE...

76

EIS-0285-SA-142: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis EIS-0285-SA-142: Supplement Analysis Transmission System Vegetation Management Program Supplement Analysis for the Transmission System Vegetation Management...

77

EIS-0290-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project DOEEIS-0290-SA-02: Supplement Analysis Naval Reactors...

78

EIS-0026-SA-09: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-09: Supplement Analysis EIS-0026-SA-09: Supplement Analysis Supplement Analysis for a Proposal to Temporarily Store Defense Transuranic Waste Prior to Disposal at the Waste...

79

EIS-0026-SA-05: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

-SA-05: Supplement Analysis EIS-0026-SA-05: Supplement Analysis Waste Isolation Pilot Plant Site Wide Operations, Carlsbad, New Mexico This supplement analysis examines changes to...

80

Supplemental Analysis for the Final Environmental Impact Statement...  

Office of Environmental Management (EM)

Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final...

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EIS-0220: Supplemental record of decision and supplement analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20: Supplemental record of decision and supplement analysis 20: Supplemental record of decision and supplement analysis determination EIS-0220: Supplemental record of decision and supplement analysis determination Interim Management of Nuclear Materials at the Savannah River Site DOE has now further decided, because of health and safety vulnerabilities, to stabilize the remaining TRR spent nuclear fuel located in the Receiving Basin for Offsite Fuels (RBOF) at the SRS, using the F-Canyon and FB-Line facilities. The TRR spent nuclear fuel to be stabilized consists of the equivalent of 310 fuel rods (some of the rods were fragmented due to conditions in Taiwan) in 62 aluminum canisters stored underwater in RBOF. DOE has decided to stabilize the TRR spent nuclear fuel because additional TRR spent fuel in at least two of the canisters has failed, and DOE

82

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

83

Recommendations for the Supplement Analysis Process  

Energy.gov (U.S. Department of Energy (DOE))

DOE has prepared this guidance regarding Supplement Analyses.The guidance discusses decisions regarding whether to prepare a Supplement Analysis (SA), the substantive content of the analysis, procedural aspects of preparing an SA, and the outcomes that can result.

84

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

85

EIS-0350-SA-02: Final Supplement Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico Supplement Analysis

86

Recommendations for the Supplement Analysis Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance printed on recycled paper Recommendations for the Supplement Analysis Process Contents

87

EIS-0265-SA-90: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Supplement Analysis EIS-0265-SA-90: Supplement Analysis Watershed Management Program Naches River Water Treatment Plant Intake Screening Project (September 2002) Supplement...

88

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

89

EIS-0220: Supplemental record of decision and supplement analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

record of decision and supplement analysis record of decision and supplement analysis determination EIS-0220: Supplemental record of decision and supplement analysis determination Interim Management of Nuclear Materials at the Savannah River Site DOE has now further decided, because of health and safety vulnerabilities, to stabilize the remaining TRR spent nuclear fuel located in the Receiving Basin for Offsite Fuels (RBOF) at the SRS, using the F-Canyon and FB-Line facilities. The TRR spent nuclear fuel to be stabilized consists of the equivalent of 310 fuel rods (some of the rods were fragmented due to conditions in Taiwan) in 62 aluminum canisters stored underwater in RBOF. DOE has decided to stabilize the TRR spent nuclear fuel because additional TRR spent fuel in at least two of the canisters has failed, and DOE

90

EA-1212-SA-01: Final Supplement Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Final Supplement Analysis for the Environmental Assessment for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory

91

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

92

EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

93

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California October 1999 [This page intentionally left blank.] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS CONTACT: For additional information on For general information on the NEPA this statement write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-293 Office of NEPA Policy and Assistance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW

94

EIS-0312-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis EIS-0312-SA-02: Supplement Analysis Fish and Wildlife Implementation Plan Columbia Basin Riparian Conservation Easement Program. The action area for the...

95

EIS-0285-SA-134: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis EIS-0285-SA-134: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Bandon-Rogue-Gold Beach transmission...

96

EIS-0285-SA-104: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis EIS-0285-SA-104: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1...

97

EIS-0285-SA-101: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis EIS-0285-SA-101: Supplement Analysis Transmission System Vegetation Management Program, Spokane Region Vegetation Management for Substations and Non-Electric...

98

EIS-0285-SA-126: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Supplement Analysis EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Alvey Fairview 230kV transmission line...

99

EIS-0285-SA-121: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Murry-Custer No.1 transmission line...

100

EIS-0285-SA-113: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis EIS-0285-SA-113: Supplement Analysis Transmission System Vegetation Management Program To perform remedial vegetation management for keeping vegetation a...

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0285-SA-139: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Supplement Analysis EIS-0285-SA-139: Supplement Analysis Transmission System Vegetation Management Program - Little Goose-Lower Granite Corridor Maintenance Vegetation...

102

EIS-0285-SA-112: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis EIS-0285-SA-112: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for portions of the Ross-Alcoa transmission...

103

EIS-0285-SA-105: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis EIS-0285-SA-105: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and...

104

EIS-0285-SA-100: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Supplement Analysis EIS-0285-SA-100: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Libby-Conkelly, 12 to 264...

105

EIS-0285-SA-150: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Supplement Analysis EIS-0285-SA-150: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the East Ellensburg Tap, 16 to 319...

106

EIS-0285-SA-37: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Supplement Analysis EIS-0285-SA-37: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Monroe-Custer No.1 Transmission Line...

107

EIS-0285-SA-34: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34: Supplement Analysis EIS-0285-SA-34: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the McNary-Ross Transmission Line ROW...

108

EIS-0026-SA-07: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis EIS-0026-SA-07: Supplement Analysis Waste Isolation Pilot Plant Site-Wide Operations, Carlsbad Field Office The Proposed Action is to continue the...

109

EIS-0350-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-01: Supplement Analysis EIS-0350-SA-01: Supplement Analysis Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos...

110

Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spend Nuclear Fuel and High-Leval Radioactive Waste at Yucca Mountain, Nye County, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1D October 2007 Table of Contents Summary Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1D October 2007 Printed on recycled paper with soy ink. COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal

111

Microsoft Word - supplement Analysis SWEIS82302.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

38SA2 38SA2 Supplement Analysis Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory Modification of Management Methods for Transuranic Waste Characterization at Los Alamos National Laboratory August 13, 2002 Department of Energy National Nuclear Security Administration Los Alamos Site Office Supplement Analysis for the SWEIS Page 1 August 13, 2002 Introduction This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) (DOE/EIS-0238) adequately addresses the environmental effects of a waste management proposal for installing and operating modular units for the

112

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Closing the Circle: Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table of Contents Part I: Making of the Nuclear Weapons Complex, 1942-1955 1 The Manhattan Project: Genesis of the Complex 1 2 Health and Safety Concerns Environmental and Waste Management Concerns 3 The Atomic Energy Commission: Expansion of the Complex

113

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

User Access Policy - Version 1.0 User Access Policy - Version 1.0 DOE NSRC User Access Policy December 9, 2002 page 1 DRAFT General Policies and Procedures for User Access to the DOE Nanoscale Science Research Centers 1. Preamble The mission of the U.S. Department of Energy (DOE) Nanoscale Science Research Centers (NSRCs) is to support users in doing outstanding science in a safe environment. To this end, each Center must have: * An array of state-of-the-art equipment and laboratories for synthesis, fabrication, characterization, and simulation of nanoscale materials and structures * A skilled staff to support this equipment, users, and the associated science but above all * A user scientific program that provides leadership in nanoscale science and technology This document addresses the policies and procedures for user access to the NSRCs.

114

EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Production of Tritium in a Commercial Light Water Reactor (CLWR) Tritium Readiness Supplemental Environmental Impact Statement

115

EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Production of Tritium in a Commercial Light Water Reactor (CLWR) Tritium Readiness Supplemental Environmental Impact Statement

116

SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-SA-02 0-SA-02 September 2013 SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR PLUTONIUM-238 PRODUCTION FOR RADIOISOTOPE POWER SYSTEMS (DOE/EIS-031 0-SA-02) U.S. DEPARTMENT OF ENERGY 1.0 1.6 2.0 3.0 4.0 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2 TABLE OF CONTENTS INTRODUCTION ............................................................................................................ 1 Overview ........................................................................................................................ . 1 Background ..................................................................................................................... 2 Purpose and Need for this Supplement Analysis ............................................................ 6

117

SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC  

NLE Websites -- All DOE Office Websites (Extended Search)

1 0-SA-02 1 0-SA-02 September 2013 SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR PLUTONIUM-238 PRODUCTION FOR RADIOISOTOPE POWER SYSTEMS (DOE/EIS-031 0-SA-02) U.S. DEPARTMENT OF ENERGY 1.0 1.6 2.0 3.0 4.0 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2 TABLE OF CONTENTS INTRODUCTION ............................................................................................................ 1 Overview ........................................................................................................................ . 1 Background ..................................................................................................................... 2 Purpose and Need for this Supplement Analysis ............................................................ 6

118

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

⇒ ⇒ DRAFT 19 December 2012⇐= Status of the heaviest elements as of January 2013 Don Groom, Particle Data Group Superheavy elements are normally synthesized by exposing a high-Z target to a 2.5-7.5 MeV/u ion beam such as 48 Ca or 70 Zn. The target can be a stable isotope such as 208 Pb or 209 Bi; in this case the process is called cold fusion. If the target is radioactive (an actinide), it is a "hot fusion" reaction. Targets as heavy as 249 Bk have been used. Since fusion is followed by neutron loss (e.g. 248 Cf( 48 Ca,4n) 292 Lv), the atomic numbers of the beam and target nuclei determine whether the fusion products have even or odd Z. The main laboratories involved are at Dubna, Darmstadt, Berkeley, and RIKEN Nashina Center. Fusion cross sections steadily decrease with increasing Z, and are in the picobarn range for the heaviest elements. The cross section can be optimized for a given

119

Draft Supplemental Environmental Assessment For General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland, DOE/EA-1723S (December 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT SUPPLEMENTAL ENVIRONMENTAL DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT For General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland May 2011 U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY U.S. Department of Energy General Motors National Energy Technology Laboratory Supplemental Environmental Assessment i May 2011 ACKNOWLEDGEMENT This report was prepared with the support of the U.S. Department of Energy (DOE) under Award Number DE-EE0002629. U.S. Department of Energy General Motors National Energy Technology Laboratory Supplemental Environmental Assessment ii May 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing

120

EIS-0281-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis EIS-0281-SA-03: Supplement Analysis Installation of a Petawatt Laser System in TA-IV Department of Energy has identified a need to revitalize High Energy...

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EIS-0251-SA-01: Supplement Analysis | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EIS-0251-SA-01: Supplement Analysis EIS-0251-SA-01: Supplement Analysis Container System for the Management of DOE Spent Nuclear Fuel Located at the INEEL The Proposed Action...

122

EIs-0285-0455: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIs-0285-0455: Supplement Analysis EIs-0285-0455: Supplement Analysis Transmission System Vegetation Management Program FEIS-- (Bandon-Rogue No. 1) PP&A Project 2178 The project...

123

EIS-0243-SA-02: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

-SA-02: Supplement Analysis EIS-0243-SA-02: Supplement Analysis Nevada Test Site and Off-Site Locations in the State of Nevada to Address the Increase in Activities Associated with...

124

EIS-0026-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis EIS-0026-SA-04: Supplement Analysis Use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP, Carlsbad Field Office DOE is proposing to use...

125

EIS-0218-SA-01: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

Analysis EIS-0218-SA-01: Supplement Analysis Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program The objective of this analysis was to determine whether...

126

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

127

EIS-0203-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis 2: Supplement Analysis EIS-0203-SA-02: Supplement Analysis INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This second Supplement Analysis (2005 SA) examined the changes to activities at the INL Site since the 2002 SA. The 2005 Supplement Analysis did not re-do the analyses conducted in the 2002 SA but evaluated actions from that time forward. The 2005 SA reviewed all NEPA documentation prepared since the 2002 Supplement Analysis to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. It also examined INL Site operations program by program to determine what changes had taken place and whether they were

128

EIS-0203-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

203-SA-02: Supplement Analysis 203-SA-02: Supplement Analysis EIS-0203-SA-02: Supplement Analysis INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This second Supplement Analysis (2005 SA) examined the changes to activities at the INL Site since the 2002 SA. The 2005 Supplement Analysis did not re-do the analyses conducted in the 2002 SA but evaluated actions from that time forward. The 2005 SA reviewed all NEPA documentation prepared since the 2002 Supplement Analysis to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. It also examined INL Site operations program by program to determine what changes had taken place and whether they were

129

Draft Supplemental Programmatic Environmental Impact Statement on Stockpile Stewardship and Management for a Modern Pit Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modern Pit Facility Draft Environmental Impact Statement Modern Pit Facility Draft Environmental Impact Statement xii ACRONYMS AND ABBREVIATIONS AC/MC Analytical Chemistry and Materials Characterization ACHP Advisory Council on Historic Preservation ALARA as low as reasonably achievable ALOHA Aerial Location of Hazardous Atmospheres AQCR Air Quality Control Region ARF airborne release fraction Bison-m Biota Information System of New Mexico BLM Bureau of Land Management BLS Bureau of Labor Statistics BNM Bandelier National Monument CAA Clean Air Act CAIRS Computerized Accident/Incident Reporting System CD-0 critical decision on mission need CEQ Council on Environmental Quality CFR Code of Federal Regulations CGTO Consolidated Group of Tribes and Organizations

130

EIS-0407-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0407-SA-01: Supplement Analysis Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas This EIS analyzed the potential direct, indirect, and cumulative environmental impacts of the design, construction, and startup of a biomass-to-ethanol and energy production facility--the Biorefinery Project. The Supplement Analysis examines the potential environmental impacts of the Modified Proposed Action and addresses whether the potential environmental impacts are within the range of the potential environmental impacts analyzed in the FEIS. Supplement Analysis for the Final environmental Impact Statement for the Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas (EIS-0407-SA-1) (July 2011)

131

Draft Complex Transformation Supplemental Programmatic Environmental Impact Statement (DOE/EIS-0236-S4) (1/11/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Federal Register 3 Federal Register / Vol. 73, No. 8 / Friday, January 11, 2008 / Notices Commission's Rules of Practice and Procedure. (G) The Secretary is directed to publish a copy of this order in the Federal Register. (H) The refund effective date in Docket No. EL08-8-000 established pursuant to section 206(b) of the Federal Power Act is 5 months from the date of the filing of the complaint. By the Commission. Kimberly D. Bose, Secretary. [FR Doc. E8-301 Filed 1-10-08; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Draft Complex Transformation Supplemental Programmatic Environmental Impact Statement AGENCY: National Nuclear Security Administration, U.S. Department of Energy. ACTION: Notice of Availability and Public Hearings.

132

EIS-0265-SA-91: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis EIS-0265-SA-91: Supplement Analysis Watershed Management Program - Hood River Fish Habitat (Evans Creek Culvert Replacement) Bonneville Power Administration and the...

133

EIS-0170-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis EIS-0170-SA-01: Supplement Analysis System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada...

134

EIS-0399-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project Proposed Action: Modification to relocate four segments of the...

135

EIS-0265-SA-165: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65-SA-165: Supplement Analysis 65-SA-165: Supplement Analysis EIS-0265-SA-165: Supplement Analysis Watershed Management Program - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing. Supplement Analysis for the Watershed Management Program EIS, - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence, DOE/EIS-0265-SA-165 (August 2004) More Documents & Publications EIS-0265-SA-169: Supplement Analysis EIS-0265-SA-57: Supplement Analysis EIS-0265-SA-58: Supplement Anlalysis

136

EIS-0225-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0225-SA-01: Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components - AL-R8 Sealed Insert Container This SA is submitted according to the requirements for determining the need for supplemental EISs (10 CFR 1021.3(4) in DOE's regulations for NEPA implementation. This SA specifically addresses the issue of another type of container for the pit repackaging system. DOE/EIS-0225, Supplement Analysis for Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components - AL-R8 Sealed Insert Container (August 1998) More Documents & Publications EIS-0225-SA-03: Supplement Analysis EIS-0225-SA-04: Supplement Analysis

137

EIS-0285-SA-123: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management on Malin-Hilltop. Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on controlling these trees by removal. In addition, sagebrush along access roads and within 30 feet of structures will be mowed for fire prevention purposes. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123) Malin-Hilltop (February 2003) More Documents & Publications EIS-0285-SA-118: Supplement Analysis EIS-0285-SA-133: Supplement Analysis

138

EIS-0285-SA-32: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Supplement Analysis 32: Supplement Analysis EIS-0285-SA-32: Supplement Analysis Watershed Management Program - Walla Walla County, Washington Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. DOE/EIS-0285-SA-32, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Walla Walla County, Washington (November 2001) More Documents & Publications EIS-0285-SA-02: Supplement Analysis EIS-0285-SA-64: Supplement Analysis

139

EIS-0203-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0203-SA-04: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project The NRF SPC Disposition Project would provide for the receipt, storage, characterization, certification and preparation of RH-TRU waste for transportation and disposition at WIPP. Currently, the 92 SPCs containing the RH-TRU waste are stored in hot cells and storage areas at NRF. Removing the RH-TRU waste would allow NRF operations to use the hot cells and storage for other projects. DOE/EIS-0203-F-SA-04 & DOE/EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project (May 2009) More Documents & Publications EIS-0203-SA-02: Supplement Analysis EIS-0203-SA-01: Supplement Analysis EIS-0203: Record of Decision

140

EIS-0285-SA-119: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Supplement Analysis 9: Supplement Analysis EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line Bonneville Power Administration proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119) Snohomish-Murray No. 1 Transmission Line (January 2003) More Documents & Publications EIS-0285-SA-125: Supplement Analysis EIS-0285-SA-124: Supplement Analysis

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0246-SA28: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA28: Supplement Analysis SA28: Supplement Analysis EIS-0246-SA28: Supplement Analysis Wildlife Mitigation Program, Yakima County, Washington BPA proposes to purchase four parcels of private land that total approximately 125 acres located in south-central Washington along the Naches River in Yakima County. Following acquisition, title to the land will be held by The Yakama Nation. The goal of this project is to protect and enhance riparian, wetland, and upland habitats for the benefit of fish and wildlife. DOE/EIS-0246, Bonneville Power Administration and The Yakama Nation, Supplement Analysis for the Wildlife Mitigation Program EIS, Yakima County, Washington (July 2002) More Documents & Publications EIS-0246-SA-29: Supplement Analysis EIS-0246-SA-37: Supplement Analysis EIS-0265-SA-70

142

EA-1374-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EA-1374-SA-03: Supplement Analysis Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project The Bonneville Power Administration (BPA) is funding ongoing research on Caspian terns, double-crested cormorants, and several species of gulls (glaucous-winged, western, California, and ring-billed) begun in 1996. BPA analyzed environmental impacts of the research in an Environmental Assessment (EA) completed in 2001 (DOE/EA-1374). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze additional research activities proposed as part of that project. Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project, Supplement Analysis DOE/EA-1374-SA-03 (April 2003)

143

EIS-0169-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0169-SA-03: Supplement Analysis EIS-0169-SA-03: Supplement Analysis EIS-0169-SA-03: Supplement Analysis Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the use of the WDFW's existing Yakima Hatchery for rearing and possibly incubating coho. Additional acclimation and research activities for coho are also analyzed. DOE/EIS-0169-SA-03, Supplement Analysis for Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington (March 2000)

144

EIS-0169-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0169-SA-04: Supplement Analysis EIS-0169-SA-04: Supplement Analysis EIS-0169-SA-04: Supplement Analysis Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the construction/modification upgrades to the Yakima Klickitat Fisheries Project (YKFP) fall chinook and coho experimental facilities at the Prosser and Marion Drain Hatcheries. Construction/modifications are in support of the experimental acclimation, rearing and incubating activities for coho and fall chinook. DOE/EIS-0169-SA-04: Supplement Analysis for Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities (November 2000)

145

EA-1429-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-SA-01: Supplement Analysis 9-SA-01: Supplement Analysis EA-1429-SA-01: Supplement Analysis Security Perimeter Project This Supplement Analysis (SA) has been prepared to determine if previous Department of Energy (DOE), National Nuclear Security Administration (NNSA) environmental assessments (EAs), including EA-1429 Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory, Los Alamos, New Mexico adequately address the environmental effects of a proposed modification to the location and alignment of a bypass road at Technical Area (TA) 3, or if this EA or others need to be supplemented. Supplement Analysis Security Perimeter Project, DOE/EA-1429-SA (February 2003) More Documents & Publications EA-1429: Final Environmental Assessment

146

EA-1374-SA-05: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis 5: Supplement Analysis EA-1374-SA-05: Supplement Analysis Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project The Bonneville Power Administration (BPA) is funding ongoing research on Caspian terns, double-crested cormorants, and several species of gulls (glaucous-winged, western, California, and ring-billed) begun in 1996. BPA analyzed environmental impacts of the research in an Environmental Assessment (EA) completed in 2001 (DOE/EA-1374). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze additional research activities proposed as part of that project. Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project, Supplement Analysis DOE/EA-1374-SA-05 (March 2006)

147

EIS-0220-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0220-SA-01: Supplement Analysis EIS-0220-SA-01: Supplement Analysis EIS-0220-SA-01: Supplement Analysis Seismic Activity on H-Canyon Incorporating up-to-date seismic data, WSRC completed a detailed evaluation of the likelihood of a severe earthquake and the estimated resulting structural damage of H-Canyon. This evaluation indicated that a severe earthquake capable of producing structural damage comparable to that described in the IMNM EIS would not occur more frequently than once in 5500 years. That is less frequent than the severe earthquake occurrence assumed in the IMNM EIS (1/5000 years). DOE/EIS-0220, Supplement Analysis of Seismic Activity on H-Canyon (January 1997) More Documents & Publications EIS-0220-SA-01: Supplement Analysis EIS-0220: Supplemental Record of Decision EIS-0220: Final Environmental Impact Statement

148

EIS-0082-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-01: Supplement Analysis SA-01: Supplement Analysis EIS-0082-SA-01: Supplement Analysis Salt Processing Alternatives at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina The purpose of this Supplement Analysis (SA) is to evaluate the potential impacts associated with the proposed modified processing and disposition pathway and compare those impacts with those described in the SPA SEIS to determine if the SPA SEIS should be supplemented. Interim Salt Processing followed by High Capacity Salt Processing would result in processing and disposal of actinides in slightly higher concentrations than those evaluated in the SPA SEIS. DOE/EIS-0082-S2-SA-01: Supplement Analysis for Salt Processing Alternatives at the Savannah River Site, Savannah River Operations Office, Aiken, South

149

EIS-0075-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis 2: Supplement Analysis EIS-0075-SA-02: Supplement Analysis Strategic Petroleum Reserve, New Orleans, Louisiana General site information for all current, existing expansion, and proposed new SPR sites has been derived from the Site Environmental Report or Environmental Impact Statement for expansion and is provided in the subsections below. Facilities have been described along with the applicable NEPA documentation. Site descriptions properly include the discussions of the surrounding environment as well as site location and history. DOE-SPR-EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements, Strategic Petroleum Reserve, New Orleans, Louisiana (September 2009)

150

EIS-0075-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

075-SA-02: Supplement Analysis 075-SA-02: Supplement Analysis EIS-0075-SA-02: Supplement Analysis Strategic Petroleum Reserve, New Orleans, Louisiana General site information for all current, existing expansion, and proposed new SPR sites has been derived from the Site Environmental Report or Environmental Impact Statement for expansion and is provided in the subsections below. Facilities have been described along with the applicable NEPA documentation. Site descriptions properly include the discussions of the surrounding environment as well as site location and history. DOE-SPR-EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements, Strategic Petroleum Reserve, New Orleans,

151

EIS-0265-SA-163: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program, which includes projects to improve watershed conditions, resulting in improved fish and wildlife habitat. DOEEIS-0265-SA-163: Supplement Analysis for the Watershed...

152

EIS-0250-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geologic Repository for the Disposal of Spent Nuclear and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada This Supplement Analysis examines the potential...

153

EIS-0285-SA-06: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation (April 2001) Supplement Analysis for...

154

EIS-0169-SA-05: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. DOEEIS-0169-SA-05, Supplement Analysis for YakimaKlickitat Fisheries Project,...

155

EIS-0285-SA-103: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

structures that may impede the operation and maintenance of the subject transmission line. DOeEIS-0285, Bonneville Power Administration, Supplemental Analysis for...

156

EIS-0285-SA-61: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vegetation Management along the Bell-Boundary No.3, 844 to 961 Transmission Line ROW. (April 2002) (DOEEIS-0285SA-61) Supplement Analysis for the Transmission System...

157

EA-1282-SA-03: Supplement Analysis | Department of Energy  

Energy Savers (EERE)

In March 2002 BPA categorically excluded dredging behind Dam 5 at the Leavenworth Fish Hatchery in connection with the project Memorandum, Supplement Analysis for the...

158

EIS-0285-SA-132: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Vegetation Management for portion of the Big Eddy - Ostrander 1 500 kV transmission line located from tower structure 312 to 393 Supplement Analysis for the...

159

EIS-0169-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0169-SA-02: Supplement Analysis EIS-0169-SA-02: Supplement Analysis EIS-0169-SA-02: Supplement Analysis Yakima Fisheries Project-Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery. Cle Elum Supplementation and Research Facility, Cle Elum, Washington The Yakima Fisheries Project is co-managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). The project consists of the collection of salmonid broodstock, incubation of eggs and rearing of fry in hatcheries, the acclimation and release of smolts, and related ecological studies in the study of natural production. DOE/EIS-0169-SA-02: Supplement Analysis for Yakima Fisheries Project-Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery. Cle Elum Supplementation and Research Facility,

160

EIS-0203-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03-SA-01: Supplement Analysis 03-SA-01: Supplement Analysis EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management This Supplement Analysis used four primary methods for determining whether the 1995 EIS remains adequate. 1) Review of all NEPA documentation prepared in the last five years to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. 2) Examination of INEEL operations program by program to determine what changes had taken place and whether they were within the analyzed scope of the 1995 EIS. 3) Review of changes, if any, in each environmental discipline that was analyzed in the 1995 EIS.

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0203-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management This Supplement Analysis used four primary methods for determining whether the 1995 EIS remains adequate. 1) Review of all NEPA documentation prepared in the last five years to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. 2) Examination of INEEL operations program by program to determine what changes had taken place and whether they were within the analyzed scope of the 1995 EIS. 3) Review of changes, if any, in each environmental discipline that was analyzed in the 1995 EIS.

162

EIS-0287-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0287-SA-01: Supplement Analysis Idaho High-Level Waste and Facilities Disposition DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005). In October 2002, DOE issued the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement that provided an analysis of the potential environmental consequences of alternatives/options for the management and disposition of Sodium Bearing Waste (SBW), High-Level Waste (HLW) calcine, and HLW facilities at the Idaho Nuclear Technology and Engineering Center. DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005)

163

Supplement Analyses (SA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 5, 2008 February 5, 2008 EIS-0378-SA-01: Supplement Analysis Port Angeles-Juan de Fuca Transmssion Project September 5, 2007 EIS-0229: Supplement Analysis (September 2007) Storage of Surplus Plutonium Materials at the Savannah River Site September 3, 2007 EIS-0026-SA-06: Supplement Analysis Transportation of Transuranic Waste in TRUPACT-III Containers, Carlsbad Field Office March 29, 2007 EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) March 29, 2007 EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride

164

EIS-0218-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

218-SA-03: Supplement Analysis 218-SA-03: Supplement Analysis EIS-0218-SA-03: Supplement Analysis Foreign Research Reactor Spent Nuclear Fuel Acceptance Program The objective of this analysis is to determine whether a supplement to the FRR SNF EIS is needed. Under the initial Record of Decision (ROD) signed May 13, 1996 and published in the Federal Register on May 17, 1996 (61 FR 25092), only spent fuel of U.S. origin that is irradiated and discharged from foreign research reactors in the eligible nations before May 13, 2006, can be accepted. Eligible spent fuel can be accepted through May 12, 2009. This Supplement Analysis evaluates a proposal to extend the expiration date for irradiation and return of a limited amount of FRR SNF (not to exceed the originally eligible 20 MTHM), and to include SNF from the Replacement

165

EIS-0218-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0218-SA-03: Supplement Analysis Foreign Research Reactor Spent Nuclear Fuel Acceptance Program The objective of this analysis is to determine whether a supplement to the FRR SNF EIS is needed. Under the initial Record of Decision (ROD) signed May 13, 1996 and published in the Federal Register on May 17, 1996 (61 FR 25092), only spent fuel of U.S. origin that is irradiated and discharged from foreign research reactors in the eligible nations before May 13, 2006, can be accepted. Eligible spent fuel can be accepted through May 12, 2009. This Supplement Analysis evaluates a proposal to extend the expiration date for irradiation and return of a limited amount of FRR SNF (not to exceed the originally eligible 20 MTHM), and to include SNF from the Replacement

166

EIS-0218-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0218-SA-04: Supplement Analysis U.S. Disposition of Gap Material--Spent Nuclear Fuel NNSA proposes expansion of current efforts under the GTRI FRR SNF Acceptance Program to allow limited quantities of SNF containing U.S.- and non-U.S.-origin HEU to be recovered from foreign countries and managed at DOE sites in the United States. This SA addresses the environmental impacts associated with the transport of this Gap Material SNF to and within the United States and its subsequent disposition. DOE/EIS-0218-SA-4: DOE, National Nuclear Security Administration, Supplement Analysis for the U.S. Disposition of Gap Material--Spent Nuclear Fuel (January 2009) More Documents & Publications EIS-0218: Revised Record of Decision EIS-0218-SA-03: Supplement Analysis

167

EIS-0348-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0348-SA-01: Supplement Analysis Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Attribution Program and Forensic Science Center's Analyses Programs Supplemental Analysis for the Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Atribution Program and Forensic Science Center's Analyses Programs at the Livermore Site. EIS-0348-SA-01; Supplemental Analysis for the Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Atribution Program and Forensic Science Center's Analyses Programs at the Livermore Site (February 2006)

168

EA-0307-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-SA-01: Supplement Analysis 7-SA-01: Supplement Analysis EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis The Bonneville Power Administration prepared an Environmental Assessment (EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a resident trout hatchery on the Colville Indian Reservation to partially mitigate for anadromours and other fish losses resulting from the the construction and operation of the Chief Joseph Dam and Grand Coulee Dam hydroelectric projects. Colville Resident Trout Hatchery Project Supplement Analysis

169

EIS-0026-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0026-SA-03: Supplement Analysis Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tones (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (November 2002)) More Documents & Publications EIS-0026-SA-02: Supplement Analysis

170

EIS-0285-SA-448: Supplement Analysis | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-448: Supplement Analysis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-448) Pearl-Marion No. 1 Transmission Line Corridor) Project No. PP&A # 2049 Vegetation management along the Pearl-Marion #1 500-kV transmission line corridor rights-of-way (ROW) from Pearl Substation to Marion Substation. The corridor includes 4.5 miles of the Ostrander-Pearl #1 and 3 miles of the Big Eddy-Chemawa #1 tranmission line ROW. The corridor ranges from 150 to 562 feet in width and traverses approximately 44 miles of terrain. EIS-0285-SA-448.pdf More Documents & Publications CX-007986: Categorical Exclusion Determination EIS-0285-SA-25: Supplement Analysis CX-008879: Categorical Exclusion Determination

171

EIS-0407-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07-SA-01: Supplement Analysis 07-SA-01: Supplement Analysis EIS-0407-SA-01: Supplement Analysis Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas This EIS analyzed the potential direct, indirect, and cumulative environmental impacts of the design, construction, and startup of a biomass-to-ethanol and energy production facility--the Biorefinery Project. The Supplement Analysis examines the potential environmental impacts of the Modified Proposed Action and addresses whether the potential environmental impacts are within the range of the potential environmental impacts analyzed in the FEIS. Supplement Analysis for the Final environmental Impact Statement for the Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas (EIS-0407-SA-1) (July 2011)

172

EIS-0309-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-SA-02: Supplement Analysis 09-SA-02: Supplement Analysis EIS-0309-SA-02: Supplement Analysis Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States The United States (U.S.) Department of Energy (DOE) National Nuclear Security Administration (NNSA) has prepared this Supplement Analysis (SA) for the air and ocean transport of enriched uranium between foreign nations and the United States pursuant to the National Environmental Policy Act (NEPA). It evaluates the environmental impacts associated with transport of enriched uranium from foreign countries to the NNSA Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee (the Proposed Action). Supplement Analysis for the Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States (August 2006)

173

EIS-0075-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0075-SA-01: Supplement Analysis Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation, Strategic Petroleum Reserve, New Orleans, Louisiana The purpose of this analysis is threefold: to document changes of National Environmental Policy Act (NEPA) significance to the SPR and to document the changes to environmental laws, regulations, and orders since the original and supplemental Environmental Impact Statements (EIS) documents listed below were prepared, to analyze the impacts of these changes to the original Record(s) Of Decision(s) (RODs) and to detail any recommended additional NEPA actions, if needed. DOE/SPR/EIS-0075-SA-01, Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering

174

EIS-0281-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis 2: Supplement Analysis EIS-0281-SA-02: Supplement Analysis Sandia National Laboratories/New Mexico Isentropic Compression and Flyer Plate Experiments Involving Plutonium at the Z and Saturn Accelerators This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS), DOE/EIS-0281, adequately addresses the environmental effects of a proposal to conduct isentropic compression and flyer plate experiments involving plutonium at the Z and Saturn Accelerators, or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplement Analysis for Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico Isentropic Compression and Flyer Plate

175

EIS-0075-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

075-SA-01: Supplement Analysis 075-SA-01: Supplement Analysis EIS-0075-SA-01: Supplement Analysis Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation, Strategic Petroleum Reserve, New Orleans, Louisiana The purpose of this analysis is threefold: to document changes of National Environmental Policy Act (NEPA) significance to the SPR and to document the changes to environmental laws, regulations, and orders since the original and supplemental Environmental Impact Statements (EIS) documents listed below were prepared, to analyze the impacts of these changes to the original Record(s) Of Decision(s) (RODs) and to detail any recommended additional NEPA actions, if needed. DOE/SPR/EIS-0075-SA-01, Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering

176

EIS-0240-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-SA-01: Supplement Analysis 0-SA-01: Supplement Analysis EIS-0240-SA-01: Supplement Analysis Disposition of Surplus Highly Enriched Uranium This supplement analysis (SA) summarizes the status of HEU disposition activities conducted to date and evaluates the potential impacts of continued program implementation. In addition, this SA considers the potential environmental impacts of proposed new DOE/NNSA initiatives to support the surplus HEU disposition program. Specifically, DOE/NNSA is proposing new end-users for existing program material, new disposal pathways for existing program HEU discard material, and down-blending additional quantities of HEU. DOE/EIS-0240, Supplement Analysis for the Disposition of Surplus Highly Enriched Uranium (October 2007) More Documents & Publications

177

EIS-0285-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-02: Supplement Analysis 85-SA-02: Supplement Analysis EIS-0285-SA-02: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attachment. BPA is clearing the danger trees to prevent them from falling or growing into the lines causing outages. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS(DOE/EIS-0285/SA-02) (March 2001) More Documents & Publications EIS-0285-SA-64: Supplement Analysis CX-010347: Categorical Exclusion Determination

178

EIS-0218-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0218-SA-02: Supplement Analysis EIS-0218-SA-02: Supplement Analysis EIS-0218-SA-02: Supplement Analysis Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program The objective of this analysis was to determine whether a supplement to the orginal FRR SNF EIS was needed. The orginal EIS broadly evaluated the transport by ship of spent nuclear fuel from CNWS to INEEL. This Supplement Analysis examined the potential impacts of accepting foreign research reactor spent nuclear fuel from 41 eligible countries under three scenarios not specifically examined in the orginal EIS. These three scenarios were: (1) accepting FRR SNF that would have been eligible for receipt under criteria set forth in the EIS, but which was not included in the estimated spent fuel inventories for purposes of

179

EIS-0265-SA-75: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0265-SA-75: Supplement Analysis EIS-0265-SA-75: Supplement Analysis EIS-0265-SA-75: Supplement Analysis Watershed Management Program - Gourlay Creek Fish Ladder Project Bonneville Power Administration proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of Scappoose owns and manages close to half of the Gourlay Creek Watershed including high quality habitat above and below the Gourlay Creek Dam. Gourlay Creek Dam has been identified as a key limiting factor in the re-generation of salmon and trout in the Gourlay Creek Watershed. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) - Gourlay Creek Fish Ladder Project (February 2002) More Documents & Publications EIS-0265-SA-59: Supplement Analysis

180

EIS-0281-SA-01: Supplemental Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81-SA-01: Supplemental Analysis 81-SA-01: Supplemental Analysis EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS) adequately addresses the environmental effects of a proposal for reestablishing long-term pulse mode testing at the Annular Core Research Reactor (ACRR) or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplemental Analysis: Site-Wide Environmental Impact Statement For Sandia National Laboratories/New Mexico Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0225-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5-SA-04: Supplement Analysis 5-SA-04: Supplement Analysis EIS-0225-SA-04: Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components This second 5-Year update SA fulfills DOE's requirement to review the SWEIS at least every 5 years as required by 10 CFR 1021.330(d). This SA accomplishes that requirement by comparing the information presented in the SWEIS with changes and proposed changes, through 2011, in the environment and Pantex Plant missions, activities, programs, and impacts. DOE/EIS-0225-SA-04: Supplement Analysis for the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components (October 2008) More Documents & Publications EIS-0225-SA-05: Supplement Analysis

182

EIS-0265-SA-99: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Supplement Analysis 9: Supplement Analysis EIS-0265-SA-99: Supplement Analysis Watershed Management Program The overall objective of the project is to restore as much as possible, the natural character and function of the Longley Meadows wetland complex. This project is a joint partnership among the CTUIR, Grand Rhonda Model Watershed Program, Oregon Department of Fish and Wildlife, Natural Resource Conservation Service, U.S. Department of Agriculture, and BPA. This project involves several separate components that are part of a regionwide effort to protect and restore anadromous fish habitat in the Grand Ronde Basin Supplement Analysis for the Watershed Management Program Environmental Impact Statement (November 2002), DOE/EIS-0265-SA-99 More Documents & Publications EA-1173-SA-01: Supplement Analysis

183

EIS-0281-SA-01: Supplemental Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplemental Analysis -SA-01: Supplemental Analysis EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS) adequately addresses the environmental effects of a proposal for reestablishing long-term pulse mode testing at the Annular Core Research Reactor (ACRR) or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplemental Analysis: Site-Wide Environmental Impact Statement For Sandia National Laboratories/New Mexico Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National

184

EIS-0309-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

309-SA-02: Supplement Analysis 309-SA-02: Supplement Analysis EIS-0309-SA-02: Supplement Analysis Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States The United States (U.S.) Department of Energy (DOE) National Nuclear Security Administration (NNSA) has prepared this Supplement Analysis (SA) for the air and ocean transport of enriched uranium between foreign nations and the United States pursuant to the National Environmental Policy Act (NEPA). It evaluates the environmental impacts associated with transport of enriched uranium from foreign countries to the NNSA Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee (the Proposed Action). Supplement Analysis for the Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States (August 2006)

185

EIS-0310-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0310-SA-01: Supplement Analysis Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States. The Department of Energy (DOE), pursuant to the National Environmental Policy Act (NEPA), issued the Final PEIS for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure (NI) PEIS, DOE/EIS-0310) in December 2000. Supplement Analysis for the Programmatic Environmental Impact Statement

186

EIS-0247-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0247-SA-01: Supplement Analysis EIS-0247-SA-01: Supplement Analysis EIS-0247-SA-01: Supplement Analysis Proposed Superconducting Linear Accelerator at the Spallation Neutron Source, Oak Ridge, Tennessee A superconducting linear accelerator (linac) is proposed as a replacement for a portion of the ambient-temperature linac currently in the Project Baseline. This Supplement Analysis is conducted to evaluate the environmental impacts associated with the proposed modification in comparison with the environmental impacts analyzed in the SNS Final Environmental Impact Statemetn (FEIS). DOE/EIS-0247, Department of Energy, Oak Ridge Operations, Supplement Analysis of the Proposed Superconducting Linear Accelerator at the Spallation Neutron Source, Oak Ridge, Tennessee (February 2000) More Documents & Publications

187

EIS-0195-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-02: Supplement Analysis -SA-02: Supplement Analysis EIS-0195-SA-02: Supplement Analysis Proposed Silo 3 Alternatives at the FEMP Approval of NEPA Supplemental Analysis for Proposed Silo 3 Alternatives at the FEMP. Final Explanation of Significant Differences for Operable Unit 4 Silo 3 Remedial Action at the Fernald Environmental Management Project, Fernald, Ohio. A Record of Decision for Operable Unit $ (OU4) was signed on December 7, 1994 identifying on-site vitrification and off-site disposal at the U.S. DOE Nevada Test Site (NTS) as the selected remedy for remediation of the silo materials. DOE/EIS-0195-SA-02, Department of Energy, Ohio Field Office, Approval of NEPA Supplemental Analysis for Proposed Silo 3 Alternatives at the FEMP (August 1996), (March 1998) More Documents & Publications

188

EA-1758: Supplement to the Cumulative Impact Analysis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1758: Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon This document presents information supplemental to the Environmental Assessment (EA), Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon (DOE/EA-1758) prepared by the Bureau of Land Management (BLM). This document addresses potential impacts associated with other proposed future geothermal projects in the area of the Newberry National Volcanic Monument that may be cumulative with those described in the EA. Supplement to the Cumulative Impact Analysis of Drilling, Testing, and

189

EIS-0157-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0157-SA-01: Supplement Analysis EIS-0157-SA-01: Supplement Analysis EIS-0157-SA-01: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore, Oakland Operations Office, Oakland, California Volume I: Main Report This supplement analysis (SA) was prepared in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (DOE 1992), hereafter referred to as the "1992 EIS/EIR," should be supplemented, a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The main body of this SA focuses on the

190

EA-1758: Supplement to the Cumulative Impact Analysis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Supplement to the Cumulative Impact Analysis : Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon This document presents information supplemental to the Environmental Assessment (EA), Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon (DOE/EA-1758) prepared by the Bureau of Land Management (BLM). This document addresses potential impacts associated with other proposed future geothermal projects in the area of the Newberry National Volcanic Monument that may be cumulative with those described in the EA. Supplement to the Cumulative Impact Analysis of Drilling, Testing, and

191

EIS-0310-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-SA-02: Supplement Analysis 0-SA-02: Supplement Analysis EIS-0310-SA-02: Supplement Analysis Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems DOE prepared this SA to evaluate the potential environmental impacts associated with its determination that the 2001 ROD offers the optimum approach for production of Pu-238. The SA helped to determine if there are significant new circumstances or information relevant to environmental concerns which would warrant preparation of a supplement to the NI PEIS or a new EIS, or that the 2001 decision can be implemented without any further NEPA review. DOE completed the SA in September 2013 and has made the determination that there are no substantial changes to the original

192

EA-1758-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EA-1758-SA-01: Supplement Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon DOE is aware of other geothermal actions being pursued in the same general area as those described in the EA. DOE is considering providing financial assistance to partially fund two other projects in the project vicinity for the purpose of promoting renewable energy exploration for geothermal reasons. Supplement to the Cumulative Impact Analysis of : Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon, DOE/EA-1758 (July 20, 2010) More Documents & Publications EA-1758: Supplement to the Cumulative Impact

193

EIS-1069-SA-07: Supplement Analysis  

Energy.gov (U.S. Department of Energy (DOE))

Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek Acclimation Site, Kittitas County, Washington

194

EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management The Department of Energy (DOE) announces the availability of the Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility(NIF) Project Specific Analysis portion (Volume III, Appendix I) of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS) DOE/EIS-0236-S1 for public review and comment. EIS-0236-S1-NOA_DEIS-1999.pdf More Documents & Publications EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

195

Draft Supplemental Environmental Impact Statement for a Geologice Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mounta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

v v COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2D; the Nevada Rail Corridor SEIS), and Draft Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369D; the Rail Alignment EIS) CONTACTS: For more information about this document, write or call: For general information on the DOE NEPA process, write or call: U.S. Department of Energy Office of Civilian Radioactive Waste Management

196

EA-1722-SA-001: Supplement Analysis for an Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22-SA-001: Supplement Analysis for an Environmental Assessment 22-SA-001: Supplement Analysis for an Environmental Assessment EA-1722-SA-001: Supplement Analysis for an Environmental Assessment Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Lancaster, OH This Supplement Analysis evaluates the potential environmental impacts of the proposed modification to the original design of the Next-Generation Lithium Ion Battery Recycling Facility to approximately 67,000 ft2, would occur within the footprint of the existing Toxco site. The proposed expansion would not significantly change the analysis of impacts for any of the resource areas evaluated in the EA. Therefore, DOE has determined that the proposed change to the project falls within the scope of analysis documented in the EA completed in April 2010.

197

Supplement analysis for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore. Volume 2: Comment response document  

SciTech Connect

The US Department of Energy (DOE), prepared a draft Supplement Analysis (SA) for Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL-L), in accordance with DOE`s requirements for implementation of the National Environmental Policy Act of 1969 (NEPA) (10 Code of Federal Regulations [CFR] Part 1021.314). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (1992 EIS/EIR) should be supplement3ed, whether a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The SA examines the current project and program plans and proposals for LLNL and SNL-L, operations to identify new or modified projects or operations or new information for the period from 1998 to 2002 that was not considered in the 1992 EIS/EIR. When such changes, modifications, and information are identified, they are examined to determine whether they could be considered substantial or significant in reference to the 1992 proposed action and the 1993 Record of Decision (ROD). DOE released the draft SA to the public to obtain stakeholder comments and to consider those comments in the preparation of the final SA. DOE distributed copies of the draft SA to those who were known to have an interest in LLNL or SNL-L activities in addition to those who requested a copy. In response to comments received, DOE prepared this Comment Response Document.

NONE

1999-03-01T23:59:59.000Z

198

EIS-0380-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-02: Supplement Analysis -SA-02: Supplement Analysis EIS-0380-SA-02: Supplement Analysis Transport and Storage of High-Activity Sealed Sources From Uruguay and Other Locations This supplement analysis (SA) was prepared to assess whether there are substantial changes, or significant new circumstances or information, relevant to environmental concerns associated with continuing the National Nuclear Security Administration's (NNSA's) activities to recover and manage high-activity beta/gamma sealed sources relative to analysis in the Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico (LANL SWEIS) and other relevant National Environmental Policy Act (NEPA) reviews. This SA analyzes an aspect of the Off-Site Source Recovery Project (OSRP) that was not

199

DOE/EIS-0357D-S1: Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (12/26/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0357D-S1 EIS-0357D-S1 SUPPLEMENT TO THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE GILBERTON COAL-TO-CLEAN FUELS AND POWER PROJECT GILBERTON, PENNSYLVANIA December 2006 U.S. DEPARTMENT OF ENERGY i COVER SHEET December 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Supplement to the Draft Environmental Impact Statement for the Gilberton Coal -to-Clean Fuels and Power Project (DOE/EIS-0357D-S1) LOCATION Gilberton, Pennsylvania CONTACTS Additional copies or information concerning this Supplement to the Draft Environmental Impact Statement (EIS) can be obtained from Ms. Janice L. Bell, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-4512.

200

EIS-0285-SA-71: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-71: Supplement Analysis 85-SA-71: Supplement Analysis EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285-SA-71, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002)

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0290-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0290-SA-03: Supplement Analysis EIS-0290-SA-03: Supplement Analysis EIS-0290-SA-03: Supplement Analysis Disposition of Mixed Low-Level Waste and Low-Level Waste from Advanced Mixed Waste Treatment Project at Commercial Facilities This SA evaluates whether a proposed action to use commercial facilities to dispose of low-level waste and treat and dispose of mixed low-level waste from the Advanced Mixed Waste Treatment Project warrants additional review of the Advanced Mixed Waste Treatment Project Final EIS and the Final Waste Management Programmatic EIS for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste. EIS-0290-SA-03-2013.pdf More Documents & Publications EA-0843: Final Environmental Assessment Chairs Meeting - November 2013 EIS-0310-SA-02: Supplement Analysis

202

EIS-0183-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0183-SA-04: Supplement Analysis Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093 Near Wasco, Sherman County, Oregon BPA proposes to purchase 24 megawatts (MW) of wind power from the Klondike Wind Project. The existing 24-MW Klondike Wind Project, owned and operated by Northwestern Windpower, LLC is located approximately 7 miles east of the City of Wasco in Sherman County, Oregon. The project already interconnects with the Federal Columbia River Transmission System on BPA's DeMoss-Maupin 69-kv transmission line. Within two years of the execution of the contract, the Point of Delivery may be shifted within the existing developed substation facilities. DOE/EIS-0183, Bonneville Power Administration, Supplement Analysis for the

203

EIS-0238-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-SA-01: Supplement Analysis 8-SA-01: Supplement Analysis EIS-0238-SA-01: Supplement Analysis Continued Operations of Los Alamos National Laboratory The Department of Energy (DOE), Albuquerque Operations Office, has prepared a Supplemental Analysis (SA) to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) adequately addresses the environmental effects of a proposal for modifying current methods utilized to receive and manage certain offsite unwanted radioactive sealed sources at Los Alamos National Laboratory or if additional documentation under the National Environmental Policy Act (NEPA) is needed.The proposal is entitled Offsite Source Recovery Project (OSRP). DOE/EIS-0238, Department of Energy, Albuquerque Operations Office,

204

EIS-0285-SA-84: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington (DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02 More Documents & Publications

205

EIS-0246-SA-17: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46-SA-17: Supplement Analysis 46-SA-17: Supplement Analysis EIS-0246-SA-17: Supplement Analysis Wildlife Management Program BPA proposes to partially fund the acquisition of 7,630 acres of shrub-steppe, riparian, and wetland habitat in northern Franklin County, Washington. Title to the land will be transferred initially to The Conservation Fund and ultimately for inclusion as part of the National Wildlife Refuge System. Passive management practices will take place on the land until an official management plan is developed and approved for the property. Some short-term control of invasive, exotic plant species may occur as necessary prior to the approval of a management plan. Bonneville Power Administration, Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) September 2001

206

EIS-0285-SA-33: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-33: Supplement Analysis EIS-0285-SA-33: Supplement Analysis EIS-0285-SA-33: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attached checklist for pertinent information on each section of referenced transmission line. BPA is clearing the danger trees to prevent them from falling or growing into the lines, thereby causing outages. Supplement Analysis for the Transmission System Vegetation Management

207

EIS-0246-SA-29: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29: Supplement Analysis 29: Supplement Analysis EIS-0246-SA-29: Supplement Analysis Wildlife Mitigation Program, on the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington BPA proposes to fund the purchase of three parcels of land within the boundaries of the Spokane Indian Reservation, totaling approximately 870 acres. Title to the land will pass to the Spokane Tribe of Indians. The goal of the property acquisition is to dedicate the land to the protection, mitigation, and enhancement of fish and wildlife affected by the construction and operation of portions of the Federal Columbia River Power System. DOE/EIS-0246, Bonneville Power Administration and The Spokane Tribe of Indians, Supplement Analysis for the Wildlife Mitigation Program EIS, on the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington

208

EIS-0265-SA-67: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0265-SA-67: Supplement Analysis EIS-0265-SA-67: Supplement Analysis EIS-0265-SA-67: Supplement Analysis Watershed Management Program - Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin Bonneville Power Administration is proposing to provide cost share for a program that will protect ESA-listed salmonid species in the Walla Walla River Basin through the installation of Washington Department of Fish and Wildlife (WDFW) and National Marine Fisheries Service (NMFS) approved fish screens on up to 197 irrigation diversions in the basin. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01) - Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin More Documents & Publications

209

EIS-0265-SA-101: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0265-SA-101: Supplement Analysis Watershed Management Program BPA proposes to fund a project to enhance fish habitat on Hawley Creek, tributary to the Lemhi River in Idaho, by leasing 7 cubic feet per second (cfs) of water per year for twenty years. The water will be dedicated to instream flow through an agreement with the water right holders and all junior water users. Due partially to irrigation withdrawals, Hawley Creek is often hydrologically disconnected from the Lemhi River. The goal of the proposed project is to leave water instream, to reconnect Hawley Creek to the Lemhi River, to improve habitat and provide passage for chinook salmon, steelhead, and bull trout, and other aquatic species. Supplement Analysis for the Watershed Management Program EIS, DOE/EIS-0265

210

EIS-0246-SA-16: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Supplement Analysis 6: Supplement Analysis EIS-0246-SA-16: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase three parcels totaling 411 acres of private property on the Coeur d'Alene Indian Reservation as partial mitigation for fish and wildlife impacts caused by the construction and operation of Albeni Falls Dam. Title to the land will be transferred to the Coeur d'Alene Tribe for wildlife habitat protection and enhancement. The goal of this project is to protect, restore, and maintain approximately 2.3 miles of Benewah Creek, its floodplain, and the associated riparian zone as native fish and wildlife habitat. DOE/EIS-0246, Bonneville Power Administration, Supplement Analysis for the Wildlife Mitigation Program EIS (August 2001) More Documents & Publications

211

EIS-0285-SA-140: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: Supplement Analysis 40: Supplement Analysis EIS-0285-SA-140: Supplement Analysis Transmission System Vegetation Management Program, Salem-Albany Bonneville Power Administration (BPA) proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

212

EIS-0246-SA-35: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis 5: Supplement Analysis EIS-0246-SA-35: Supplement Analysis Wildlife Mitigation Program, seven miles east of Juntura, Oregon, Malheur County This review is to ensure that project activities continue to be consistent with the Wildlife Mitigation Program EIS and that there continues to be no effects on endangered species or cultural resources. A Supplement Analysis was completed for the original acquistion of the property and initial project activities. This project would allow the Burns-Pauite Tribe to continue manage 6,500 acres of richly diverse property on the Malheur River while developing a Wildlife Mitigation Plan. A subsequent NEPA process will be conducted for the Wildlife Mitigation Plan. DOE/EIS-0246, Bonneville Power Administration and Burns Paiute Tribe,

213

EIS-0026-SA-06: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Supplement Analysis 6: Supplement Analysis EIS-0026-SA-06: Supplement Analysis Transportation of Transuranic Waste in TRUPACT-III Containers, Carlsbad Field Office This supplement analysis (SA) addresses a proposed action to transport some waste directly to WIPP using a new transportation container design called the Transuranic Package Transporter Model III (TRUPACT-III). TRU waste is waste that contains alpha particle-emitting radionuclides with atomic numbers greater than uranium (92) and half-lives greater than 20 years in concentrations greater than 100 nanocuries per gram of waste. TRU waste is categorized as either contact-handled (CH-TRU) or remote-handled (RH-TRU), based on the radiation level at the surface of the waste container. CH-TRU can be handled directly by trained workers. RH-TRU requires special

214

EIS-0200: DOE Notice of Availability of the Supplement Analysis |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

200: DOE Notice of Availability of the Supplement Analysis 200: DOE Notice of Availability of the Supplement Analysis EIS-0200: DOE Notice of Availability of the Supplement Analysis Transportation, Storage, Characterization, and Disposal of Transuranic Waste Currently Stored at the Battelle West Jefferson Site Near Columbus, Ohio DOE has prepared a Supplement Analysis (SA) pursuant to DOE regulations implementing the National Environmental Policy Act (NEPA) at 10 CFR 1021.314. The SA addresses DOE's proposal to ship approximately 37 cubic meters (1,307 cubic feet [ft3]) of transuranic (TRU) waste from the Battelle Columbus Laboratory West Jefferson site near Columbus, Ohio, to the Savannah River Site (SRS), a DOE site near Aiken, South Carolina, or to Waste Control Specialists, LLC (WCS), a commercial facility in Andrews,

215

EIS-0285-SA-41: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-41: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region. BPA proposes to clear unwanted vegetation around wood poles and switch platforms. The vegetation clearing around wood poles is for fire protection. Over the last 3 years, BPA has been able to increase reliability and reduce losses due to rangeland fires by applying a soil residual herbicide as a wood pole fire treatment around wood pole structures which provide a 10 to 15 foot vegetation free area at our structure sites. (DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (February 2002) More Documents & Publications

216

EIS-0285-SA-122: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis 2: Supplement Analysis EIS-0285-SA-122: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

217

EA-1422-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-SA-01: Supplement Analysis 2-SA-01: Supplement Analysis EA-1422-SA-01: Supplement Analysis Final Site-Wide Environmental Assessment for Sandia National Laboratories/California This Supplement Analysis (SA) determines whether the 2003 Final Site-Wide Environmental Assessment (SWEA) for Sandia National Laboratories/California (SNL/CA) remains adequate in characterizing potential environmental impacts from the current operation of SNL/CA, and anticipated operation over the next 5 years. The U.S. Department of Energy issued a Finding of No Significant Impact in March 2003 under any of the alternatives evaluated. For this SA, a screening review was performed for each resource area presented in the SWEA, evaluating new or modified projects or proposals, changed circumstances, and new regulations, to determine whether impacts

218

EIS-0026-SA-08: Supplemental Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26-SA-08: Supplemental Analysis 26-SA-08: Supplemental Analysis EIS-0026-SA-08: Supplemental Analysis Packaging and Handling of Remote-Handled Transuranic Waste in Shielded Containers, Carlsbad Field Office This supplement analysis (SA) addresses a proposed action to package at the generator sites, and to emplace at the Waste Isolation Pilot Plant (WIPP), a portion of the remote-handled (RH) transuranic (TRU) waste inventory using a new container design called the lead shielded container (hereinafter referred to as the shielded container). In order to increase the efficiency of its operations at WIPP, DOE is proposing a change to the emplacement scheme for a portion of the RH TRU waste inventory. DOE proposes to package a subset of the RH TRU waste streams in shielded containers to be placed in the HalfPACT transport packaging for transport

219

EIS-0246-SA-37: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0246-SA-37: Supplement Analysis Wildlife Mitigation Program, On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Bonneville Power Administration proposes to fund the purchase of four parcels of land within the boundaries of the Spokane Indian Reservation, totaling approximately 860 acres. Title to the land will pass to the Spokane Tribe of Indians. The goal of the property acquisition is to dedicate the land to the protection, mitigation, and enhancement of fish and wildlife affected by the construction and operation of portions of the Federal Columbia River Power System. DOE/EIS-0246, Bonneville Power Administration and The Spokane Tribe of Indians, Supplement Analysis for the Wildlife Mitigation Program EIS, On

220

EIS-0238-SA-04: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0238-SA-04: Supplement Analysis Continued Operation of Los Alamos National Laboratory: Recovery and Storage of Strontium-90 (Sr-90) Fueled Radioisotope Thermal Electric Generators at Los Alamos National Laboratory This SA specifically compares key impact assessment parameters of this proposal to the offsite source recovery program evaluated in the SWEIS and a subsequent SA that evaluated a change to the approach of a portion of the recovery program. It also provides an explanation of any differences between the Proposed Action and activities described in the previous SWEIS and SA analyses. DOE/EIS-0238, Supplement Analysis Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory: Recovery and

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0285-SA-70: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5-SA-70: Supplement Analysis 5-SA-70: Supplement Analysis EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002) More Documents & Publications

222

EIS-0285-SA-12: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-12: Supplement Analysis EIS-0285-SA-12: Supplement Analysis EIS-0285-SA-12: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-ofways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

223

EIS-0279-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

279-SA-01: Supplement Analysis 279-SA-01: Supplement Analysis EIS-0279-SA-01: Supplement Analysis Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and DOE/EIS-0218-SA-06) This Supplement Analysis evaluates DOE's proposal to change the management method for approximately 3.3 metric tons of heavy metal (MTHM) of aluminum-clad spent nuclear fuel (SNF) from melt and dilute to conventional processing in H-Canyon at the Savannah River Site (SRS) and to down-blend the resultant highly-enriched uranium (HEU) to low enriched uranium (LEU) for use in commercial nuclear reactor fuel. The potential environmental impacts associated with the use of conventional processing, like those associated with the melt and dilute technology, were analyzed in the SRS SNF EIS (DOE/EIS-0279).

224

EIS-0283-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Supplement Analysis 2: Supplement Analysis EIS-0283-SA-02: Supplement Analysis Surplus Plutonium Dispostion Program: Waste Solidification Building The National Nuclear Security Administration (NNSA), a separately organized agency within the U.S. Department of Energy (DOE), is proposing to construct and operate a standalone Waste Solidification Building 1 (WSR) in F-Area at the Savannah River Site (SRS) near Aiken, South Carolina. Certain liquid low-level radioactive waste (LLW) and liquid transuranic (TRU) waste expected to be generated in the Mixed Oxide Fuel Fabrication Facility (MFFF) and Pit Disassembly and Conversion Facility (PDCF) as part of the U.S. Surplus Plutonium Disposition Program would be treated and solidified in WSB. DOE/EIS-0283, National Nuclear Security Administration, Supplement Analysis

225

EIS-0285-SA-71: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285-SA-71, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002)

226

EIS-0283-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-SA-02: Supplement Analysis 3-SA-02: Supplement Analysis EIS-0283-SA-02: Supplement Analysis Surplus Plutonium Dispostion Program: Waste Solidification Building The National Nuclear Security Administration (NNSA), a separately organized agency within the U.S. Department of Energy (DOE), is proposing to construct and operate a standalone Waste Solidification Building 1 (WSR) in F-Area at the Savannah River Site (SRS) near Aiken, South Carolina. Certain liquid low-level radioactive waste (LLW) and liquid transuranic (TRU) waste expected to be generated in the Mixed Oxide Fuel Fabrication Facility (MFFF) and Pit Disassembly and Conversion Facility (PDCF) as part of the U.S. Surplus Plutonium Disposition Program would be treated and solidified in WSB. DOE/EIS-0283, National Nuclear Security Administration, Supplement Analysis

227

EIS-0290-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-03: Supplement Analysis -SA-03: Supplement Analysis EIS-0290-SA-03: Supplement Analysis Disposition of Mixed Low-Level Waste and Low-Level Waste from Advanced Mixed Waste Treatment Project at Commercial Facilities This SA evaluates whether a proposed action to use commercial facilities to dispose of low-level waste and treat and dispose of mixed low-level waste from the Advanced Mixed Waste Treatment Project warrants additional review of the Advanced Mixed Waste Treatment Project Final EIS and the Final Waste Management Programmatic EIS for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste. EIS-0290-SA-03-2013.pdf More Documents & Publications EA-0843: Final Environmental Assessment EIS-0310-SA-02: Supplement Analysis Chairs Meeting - November 2013

228

EA-1812: Final Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Supplement Analysis Final Supplement Analysis EA-1812: Final Supplement Analysis This Supplement Analysis (SA) has been prepared to address changes in the design and operating parameters of the NECO (formerly Haxtun) Wind Farm Project ("original proposed project") in Logan and Phillips Counties, Colorado. In January 2012, the DOE published the Final Environmental Assessment ("DOE/EA-1812") for the original proposed project and published a Finding of No Significant Impact (FONSI) on January 4, 2012. DOE/EA-1812 was conducted to analyze and disclose potential environmental and socioeconomic impacts that would result from the construction and operation of the original proposed project, which received federal funding through a Community Renewable Energy Deployment (CRED) Program grant to

229

EIS-0246-SA-36: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0246-SA-36: Supplement Analysis EIS-0246-SA-36: Supplement Analysis EIS-0246-SA-36: Supplement Analysis Wildlife Mitigation Program, Grant County, Oregon The compliance checklist for this project was originally completed by the Burns Paiute Tribe in 2000, and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD), as well as the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Logan Valley Wildlife Mitigation Plan, now being implemented, continues to be consistent with the aboved mentioned EISs and RODs. DOE/EIS-0246, Bonneville Power Administration and Burns Paiute Tribe, Supplement Analysis for the Wildlife Mitigation Program EIS, Grant County, Oregon (October 2003)

230

EIS-0285-SA-117: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex. BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking areas; 2) mechanical and/or spot herbicide control of some broad leafs and noxious weeds; 3) mowing, fertilizing, and broadleaf control of landscaped lawn areas; 4) weed control in ornamental shrub areas; and 4) areas requiring only mechanical control to manage unwanted grasses, and shrubs. DOE/EIS-0285-SA-117, Bonneville Power Administration, Supplement Analysis

231

EIS-0285-SA-111: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-111: Supplement Analysis Transmission System Vegetation Management Program Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure that the roots are killed. Desirable low-growing plants will not be disturbed. Only selective vegetation control methods that have little potential to harm non-target vegetation will be used. DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS

232

EIS-0026-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

026-SA-03: Supplement Analysis 026-SA-03: Supplement Analysis EIS-0026-SA-03: Supplement Analysis Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tones (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (November 2002)) More Documents & Publications

233

EIS-0169-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0169-SA-01: Supplement Analysis EIS-0169-SA-01: Supplement Analysis EIS-0169-SA-01: Supplement Analysis Bonneville Power Administration Yakima Fisheries Project- Fall Chinook and Coho Research Program, Yakima and Klickitat River Basins, Washington BPA, YIN and WDFW are proposing to collect broodstock, incubate eggs and rear fry in hatcheries; acclimate and release smolts; and study the natural production, ecological interactions, long-term fitness, and culturing/genetics of spring and fall chinook and coho salmon in the Yakima River basin. In the Klickitat basin, salmonid life history and physical habitat data would be collected. DOE/EIS-0169-SA-1: Supplement Analysis for Bonneville Power Administration Yakima Fisheries Project- Fall Chinook and Coho Research Program, Yakima and Klickitat River Basins, Washington (May 1999)

234

EIS-0285-SA-120: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Supplement Analysis 0: Supplement Analysis EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington The work will include the performance of road maintenance and tower pad maintenance along the Hanford-Ostrander transmission line. Maintenance will be performed from Tower 10/1, close to Army Loop road near the northeast corner of 200 West Area of the Hanford Nuclear Reservation to the western edge of the Arid Lands Ecological Reserve (ALE) at Tower 17/2 + 700. Total distance of the work is approximately 7.5 miles. The planned work includes spraying with herbicides to minimize vegetation regrowth along the access roads and removing shrubs from within 50 feet of each transmission tower. DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the

235

EIS-0222-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-SA-01: Supplement Analysis 2-SA-01: Supplement Analysis EIS-0222-SA-01: Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least the next 50-year planning period and lasting for as long as DOE retains legal control of some portion of the real estate. DOE/EIS-0222, Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement (June 2008) More Documents & Publications EIS-0222: Amended Record of Decision EIS-0222: Final Environmental Impact Statement

236

EIS-0285-SA-109: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Supplement Analysis 9: Supplement Analysis EIS-0285-SA-109: Supplement Analysis Transmission System Vegetation Management Program Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure that the roots are killed. Desirable low-growing plants will not be disturbed. Only selective vegetation control methods that have little potential to harm non-target vegetation will be used. (DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Santiam-Alvey # 1

237

EIS-0279-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0279-SA-01: Supplement Analysis Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and DOE/EIS-0218-SA-06) This Supplement Analysis evaluates DOE's proposal to change the management method for approximately 3.3 metric tons of heavy metal (MTHM) of aluminum-clad spent nuclear fuel (SNF) from melt and dilute to conventional processing in H-Canyon at the Savannah River Site (SRS) and to down-blend the resultant highly-enriched uranium (HEU) to low enriched uranium (LEU) for use in commercial nuclear reactor fuel. The potential environmental impacts associated with the use of conventional processing, like those associated with the melt and dilute technology, were analyzed in the SRS SNF EIS (DOE/EIS-0279). Separately, DOE proposes to transport target material, which contains HEU

238

EIS-0265-SA-170: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. Supplement Analysis...

239

EIS-0285-SA-143: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Vegetation Management for portion of the Custer-Intalco 230 1 kV transmission line located from tower structure 11 to 74 (April 2003) Supplement Analysis for...

240

EIS-0246-SA-18: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

246-SA-18: Supplement Analysis 246-SA-18: Supplement Analysis EIS-0246-SA-18: Supplement Analysis Wildlife Mitigation Program BPA proposes to fund the acquisition and preservation of approximately 99 acres of native wet prairie and oak woodland habitat in Lane County, Oregon. Title to the land will be held by The Nature Conservancy, who will convey permanent mitigation rights to BPA in the form of a conservation easement. These newly acquired parcels will become part of the existing 330-acre Willow Creek Wildlife Mitigation Area. Passive management practices may take place on the land until a wildlife mitigation and management plan is developed and approved for the property. Bonneville Power Administration and The Nature Conservancy, Supplement Analysis for the Wildlife Mitigation Program EIS, EIS-0246-SA-18 (October

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EIS-0225-SA-02: Final Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Final Supplement Analysis 2: Final Supplement Analysis EIS-0225-SA-02: Final Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapons Components Hazardous Waste Treatment and Processing Facility This SA specifically addresses the issue of housing liquid processes in a separate building, the elimination of forklift airlocks and overhead hoists from the main HWTPF, the handling of classified material, and the construction of a ramp instead of a shipping dock. DOE/EIS-0225, Final Supplement Analysis for the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapons Components Hazardous Waste Treatment and Processing Facility (January 2000) More Documents & Publications

242

EIS-0265-SA-94: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0265-SA-94: Supplement Analysis Watershed Management Program - Yakima Basin Side Channels Project, Browitt Property Acquisition Bonneville Power Administration proposes to purchase approximately 42 acres of privately-owned land in the Yakima River Basin in Kittitas County, Washington as part of the Yakima River Side Channels Project. The goal of this project is to contribute toward the rebuilding of Yakima Basin spring chinook salmon and steelhead populations by improving survival during their first year of life. This will be accomplished by protecting and restoring off-channel rearing habitats associated with the mainstem of the Yakima River. (DOE/EIS-0265/SA-94): Supplement Analysis for the Watershed Management Program EIS - Yakima Basin Side Channels Project, Browitt Property

243

EIS-0246-SA-36: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Supplement Analysis 6: Supplement Analysis EIS-0246-SA-36: Supplement Analysis Wildlife Mitigation Program, Grant County, Oregon The compliance checklist for this project was originally completed by the Burns Paiute Tribe in 2000, and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD), as well as the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Logan Valley Wildlife Mitigation Plan, now being implemented, continues to be consistent with the aboved mentioned EISs and RODs. DOE/EIS-0246, Bonneville Power Administration and Burns Paiute Tribe, Supplement Analysis for the Wildlife Mitigation Program EIS, Grant County, Oregon (October 2003)

244

EIS-0285-SA-120: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-120: Supplement Analysis 85-SA-120: Supplement Analysis EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington The work will include the performance of road maintenance and tower pad maintenance along the Hanford-Ostrander transmission line. Maintenance will be performed from Tower 10/1, close to Army Loop road near the northeast corner of 200 West Area of the Hanford Nuclear Reservation to the western edge of the Arid Lands Ecological Reserve (ALE) at Tower 17/2 + 700. Total distance of the work is approximately 7.5 miles. The planned work includes spraying with herbicides to minimize vegetation regrowth along the access roads and removing shrubs from within 50 feet of each transmission tower. DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the

245

EIS-0200: DOE Notice of Availability of the Supplement Analysis |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Supplement Analysis DOE Notice of Availability of the Supplement Analysis EIS-0200: DOE Notice of Availability of the Supplement Analysis Transportation, Storage, Characterization, and Disposal of Transuranic Waste Currently Stored at the Battelle West Jefferson Site Near Columbus, Ohio DOE has prepared a Supplement Analysis (SA) pursuant to DOE regulations implementing the National Environmental Policy Act (NEPA) at 10 CFR 1021.314. The SA addresses DOE's proposal to ship approximately 37 cubic meters (1,307 cubic feet [ft3]) of transuranic (TRU) waste from the Battelle Columbus Laboratory West Jefferson site near Columbus, Ohio, to the Savannah River Site (SRS), a DOE site near Aiken, South Carolina, or to Waste Control Specialists, LLC (WCS), a commercial facility in Andrews,

246

EIS-0200-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0200-SA-01: Supplement Analysis Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) DOE is proposing to revise the "where to prepare" decision that was based on the Waste Management Programmatic Environmental Impact Statement, DOE/EIS-0200-F, May 1997 (WM PEIS). The proposed change, as described more fully below, is to create a centralized capability at WIPP that would be used to characterize annually up to 1,250 cubic meters of DOE's contact-handled transuranic (CH-TRU) waste out of about 7,000 cubic meters expected to be received annually for disposal at WIPP. DOE/EIS-0200, Supplement Analysis and Determination for the Proposed Characterization for Disposal of Contact-Handled Transuranic Waste at the

247

DOE/EIS-0236/SA-6 Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: REPLY TO ATTN OF: DP-45 (G. Palmer, 6-1785) SUBJECT: DETERMINATION OF THE NEED FOR ADDITIONAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REVIEW TO: Dave Beck, DP-20 As requested in your action memorandum, same subject, I have reviewed the attached Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement, dated August 1999. This analysis was prepared in accordance with 10 CFR 1021.314, contains the comments on the draft Supplement Analysis, dated June 1999, and responds to the comments in Appendix D. Based on my review of the six issues analyzed in the Supplement Analysis, I have determined that none of the information and analysis represent substantial changes to the actions

248

Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spend Nuclear Fuel and High-Leval Radioactive Waste at Yucca Mountain, Nye County, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Volume I Impact Analyses Chapters 1 through 13 U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1D October 2007 Printed on recycled paper with soy ink. COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada (DOE/EIS-0250F-S1D) (Repository SEIS). CONTACTS: For more information about this document, For general information on the DOE NEPA process, write

249

EIS-0246-SA-19: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0246-SA-19: Supplement Analysis EIS-0246-SA-19: Supplement Analysis EIS-0246-SA-19: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase approximately 650 acres of private property that border the St. Joe River near Goose Heaven Lake on the Coeur d'Alene Indian Reservation as partial mitigation for fish and wildlife impacts caused by the construction and operation of Albeni Falls hydroelectric project. Title to the land will be transferred to the Coeur d'Alene Tribe for wildlife habitat protection and enhancement. The goal of this project is to protect and restore riparian, wetland, floodplain and river corridor systems to help enhance water quality and in-stream habitat in the St. Joe Watershed. Bonneville Power Administration and The Nature Conservancy, Supplement

250

Techno-Economic Analysis of Indian Draft Standard Levels for Room Air  

NLE Websites -- All DOE Office Websites (Extended Search)

Techno-Economic Analysis of Indian Draft Standard Levels for Room Air Techno-Economic Analysis of Indian Draft Standard Levels for Room Air Conditioners Title Techno-Economic Analysis of Indian Draft Standard Levels for Room Air Conditioners Publication Type Report LBNL Report Number LBNL-63204 Year of Publication 2007 Authors McNeil, Michael A., and Maithili Iyer Date Published 03/2007 Keywords India Air Conditioner Efficiency Standards Abstract The Indian Bureau of Energy Efficiency (BEE) finalized its first set of efficiency standards and labels for room air conditioners in July of 2006. These regulations followed soon after the publication of levels for frost-free refrigerators in the same year. As in the case of refrigerators, the air conditioner program introduces Minimum Efficiency Performance Standards (MEPS) and comparative labels simultaneously, with levels for one to five stars. Also like the refrigerator program, BEE defined several successive program phases of increasing stringency.

251

EIS-0283-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-03: Supplement Analysis SA-03: Supplement Analysis EIS-0283-SA-03: Supplement Analysis Transportation of Depleted Uranium Hexafluoride for Conversion to Depleted Uranium Oxide This SA evaluates a proposal to transport cylinders of DUF from the Paducah Gaseous Diffusion Plant in Piketon, Ohio to the AREVA-NP Fuel Fabrication Facility at Richland, Washington, and subsequent transport of cylinders containing DUO from Richland to the SRS. Based on this analysis, DOE's propossed action does not represent substantial changes that are relevant to environmental concerns for DUF-DUO transportation actions evaluated in the SPD EIS and there are no new circumstances or information relevant to environmental concerns that bear on the proposed action or its impacts that would warrant additional NEPA Analysis.

252

EIS-0225-SA-05: Supplement Analysis Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Determination Analysis Determination EIS-0225-SA-05: Supplement Analysis Determination Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components DOE's NNSA Production Office Pantex has prepared a SA to determine whether the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components, also known as the Site-Wide Environmental Impact Statement, adequately addresses the environmental impacts of continued Pantex Plant operations, or if additional documentation under NEPA is needed. EIS-0225-SA-05-Determination-2013.pdf More Documents & Publications EIS-0225-SA-05: Supplement Analysis 2013 Annual Planning Summary for the NNSA Production Office EIS-0225-SA-03: Supplement Analysis

253

DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (DOE/EIS-0357D-S1)(01/16/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Federal Register 0 Federal Register / Vol. 72, No. 9 / Tuesday, January 16, 2007 / Notices Dated: December 19, 2006. M. A. Harvison, Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 07-115 Filed 1-12-07; 8:45 am] BILLING CODE 3810-FF-M DEPARTMENT OF ENERGY Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project AGENCY: Department of Energy. ACTION: Notice of availability. SUMMARY: The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft

254

EIS-0026-SA-02: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-02: Supplement Analysis SA-02: Supplement Analysis EIS-0026-SA-02: Supplement Analysis Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant DOE proposes to dispose of up to 2,500 cubic meters (88,000 cubic feet) of PCB-commingled TRU waste at WIPP. Currently, PCB-commingled TRU waste with a concentration less than 50 parts per million (ppm) is authorized for disposal at WIPP if the waste otherwise meets WIPP's Waste Acceptance Criteria. For purposes of this analysis, DOE assumes that all of its PCB- commingled wastes have PCB concentrations of 500 ppm or more. DOE proposes to characterize and, if necessary, repackage PCB-commingled TRU waste in storage at: INEEL, the Hanford Site4, ORR, RFETS, and SRS5 (as well as KAPL) for disposal at WIPP. DOE would then transport this waste to WIPP by

255

EIS-0285-SA-141: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-141: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

256

EIS-0285-SA-117: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-117: Supplement Analysis 85-SA-117: Supplement Analysis EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex. BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking areas; 2) mechanical and/or spot herbicide control of some broad leafs and noxious weeds; 3) mowing, fertilizing, and broadleaf control of landscaped lawn areas; 4) weed control in ornamental shrub areas; and 4) areas requiring only mechanical control to manage unwanted grasses, and shrubs.

257

EIS-0285-SA-27: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-27: Supplement Analysis Transmission System Vegetation Management Program, Eugene Region Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and associated access roads that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the

258

EIS-0285-SA-137: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-137: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have lowgrowing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

259

EIS-0246-SA-34: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

246-SA-34: Supplement Analysis 246-SA-34: Supplement Analysis EIS-0246-SA-34: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana Bonneville Power Administration proposes to fund the acquisition of approximately 8,500 acres consisting of shrub-steppe rangeland, 1,480 acres of Conservation Reserve Program (CRP)/cropland, 40,000 lineal feet of stream waterfront, 426 acres of main stem riparian habitat, 400 acres of wetlands, and 23.5 miles of tributary streams in Asotin County, Washington. The Schlee Property proposed for acquisition, which is divided into the Smoothing Iron and George Creek parcels, adjoins the Umatilla National Forest, the Washington Department of Fish and Wildlife (WDFW) Asotin Creek Wildlife Area, and other state lands. Title to the land will be held by

260

EIS-0285-SA-11: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of- way to control the

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIS-0285-SA-28: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-28: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National

262

EIS-0285-SA-43: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-43: Supplement Analysis 85-SA-43: Supplement Analysis EIS-0285-SA-43: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. A follow-up

263

EIS-0285-SA-38: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA

264

EIS-0285-SA-15: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Supplement Analysis : Supplement Analysis EIS-0285-SA-15: Supplement Analysis Transmission System Vegetation Manaement Program, the ROWs span sections of Vancouver Washington and Portland Oregon and are all located in the Olympia Region BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon

265

EIS-0246-SA-24: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Supplement Analysis 4: Supplement Analysis EIS-0246-SA-24: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase a conservation easement on approximately 221 acres of the Herbert parcel in Benton County, Oregon for the protection of wetland, riparian, and riverine habitats. The Herbert parcel is located within the Willamette Basin Mitigation Program's Canby Muddy Creek/Mary's River Focus Area southwest of the City of Corvallis. The Herbert site is a cooperative project principally facilitated by BPA, Trust for Public Land, City of Corvallis, and Oregon Department of Fish and Wildlife. Once the conservation easement is finalized, the participants will develop a management plan for the Herbert parcel. Future management actions will likely involve the restoration and enhancement of riparian

266

EIS-0285-SA-13: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening

267

EIS-025-SA-106: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-106: Supplement Analysis -SA-106: Supplement Analysis EIS-025-SA-106: Supplement Analysis Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments.

268

EIS-0285-SA-118: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV, Pacific County, Washington Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.0 miles of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 30 feet from center of poles and or

269

EIS-0229-SA-03: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-03: Supplement Analysis -SA-03: Supplement Analysis EIS-0229-SA-03: Supplement Analysis Fabrication of Mixed Oxide Fuel Lead Assemblies in Europe The U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) is proposing to fabricate, on a one-time basis, mixed oxide (MOX) fuel lead assemblies1 in existing facilities in Europe (referred to as Eurofab) rather than at Los Alamos National Laboratory (LANL) as previously decided (65 Federal Register [FR] 1608, January 11, 2000). In May 2000, DOE determined that cost and schedule impacts and programmatic considerations precluded lead assembly fabrication at LANL and discontinued related activities (Holgate 2000). As a result, an initial assessment of alternatives for lead assembly fabrication was conducted by Duke COGEMA Stone & Webster (DCS), the team that was awarded

270

EIS-0246-SA-39: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-39: Supplement Analysis SA-39: Supplement Analysis EIS-0246-SA-39: Supplement Analysis Wildlife Mitigation Program, Pend Oreille County, Washington Bonneville Power Administration (BPA) funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key habitats within the Pend Oreille Watershed. This mitigation program purchases private land to be owned and managed by program participants for the protection, mitigation, and enhancement of wildlife affected by the construction and operation of the Federal hydroelectric facilities on the Columbia River. BPA is currently working with the Kalispel Tribe of Indians to acquire and manage three parcels that total approximately 890 acres of land within Pend Oreille County, Washington. The properties proposed for

271

EIS-0246-SA-23: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0246-SA-23: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase a conservation easement on approximately 16 acres of the Canby Ferry parcel in Clackamas County, Oregon for the protection of wetland, riparian, and riverine habitats. This project is part of a multi-agency effort to protect Willamette River frontage and to connect existing Oregon State Park lands with recreational trails. Once the conservation easement is finalized, a management plan will be developed for the Canby Ferry parcel and adjacent parcels, including the Fish Eddy parcel and the Molalla State Park parcel. Future management actions on these lands will likely involve wildlife habitat and riparian area enhancement, restoration, and preservation activities.

272

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

273

EIS-0246-SA-33: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0246-SA-33: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana Bonneville Power Administration is proposing to fund a fish barrier project with Montana Fish, Wildlife, and Parks that proposes to block migrating rainbow trout during spawning to prevent the production and recruitment of approximately 2,500 rainbow trout into the Flathead River system annually. This action will reduce the opportunity for hybridization between rainbow and native westslope cutthroat trout; a species currently under consideration for threatened status under the Endangered Species Act. The project will be accomplished by replacing an existing culvert and retrofitting a fish passage barrier to the bayou. DOE/EIS-0246, Bonneville Power Administration and Montana Fish, Wildlife,

274

EIS-0246-SA-39: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46-SA-39: Supplement Analysis 46-SA-39: Supplement Analysis EIS-0246-SA-39: Supplement Analysis Wildlife Mitigation Program, Pend Oreille County, Washington Bonneville Power Administration (BPA) funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key habitats within the Pend Oreille Watershed. This mitigation program purchases private land to be owned and managed by program participants for the protection, mitigation, and enhancement of wildlife affected by the construction and operation of the Federal hydroelectric facilities on the Columbia River. BPA is currently working with the Kalispel Tribe of Indians to acquire and manage three parcels that total approximately 890 acres of land within Pend Oreille County, Washington. The properties proposed for

275

EIS-0285-SA-133: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures along the subject transmission line corridors. Approximately 20 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Access roads and tower sites will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line

276

EIS-0337-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-SA-01: Supplement Analysis 7-SA-01: Supplement Analysis EIS-0337-SA-01: Supplement Analysis West Valley Demonstration Project Waste Management The Department of Energy's (DOE) West Valley Demonstration Project (WVDP) prepared a final waste management environmental impact statement (WVDP WM ElS) that examined the potential environmental impacts associated with the proposed shipment of radioactive wastes that were either in storage or would be generated over a 10-year period (DOE 2003). Since the EIS was issued, new information has become available regarding the volume and type of low level radioactive waste (LLW), and DOE now proposes to use additional disposal locations for LLW waste for which the transportation impacts were not analyzed in the WVDP WM EIS. West Valley Demonstration Project Waste Management Environmental Impact

277

EIS-0285-SA-21: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-21: Supplement Analysis EIS-0285-SA-21: Supplement Analysis EIS-0285-SA-21: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Noxon-Hot Springs/Taft-Hot Springs 56/3 to 66/7+600 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of

278

EIS-0246-SA-27: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0246-SA-27: Supplement Analysis Wildlife Mitigation Program, Kalispell, Flathead County, Montana BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout and prevent hybridization with westslope cutthroat trout. Montana Fish, Wildlife & Parks (MFWP) will operate a fish trap downstream of the barrier for 6-10 consecutive years to manually remove the rainbow trout and hybrid spawners from the population. Removal of rainbow trout and hybrids from the stream will eradicate the existing hybrid population spawning in Abbot Creek and ultimately reduce the threat of hybridization in the Flathead River system. Pending completion of a successful disease screening and

279

EIS-0238-SA-05: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis 5: Supplement Analysis EIS-0238-SA-05: Supplement Analysis Continued Operation of Los Alamos National Laboratory: Proposed Horizontal Expansion of the Restricted Airspace up to 5,000 feet at Los Alamos National Laboratory The DOE's National Nuclear Security Administration (NNSA) is not proposing to expand the horizontal dimensions of the existing 5,000-foot restricted airspace zone above LANL to include the southeast portion of TA-33 and the eastern portion of TA-54 in response to recent revised threat analyses. Operations at TA-33 and TA-54 would continue to be the same as those that are currently ongoing. Rather, security considerations have changed since the event of 9/11/01 and DOE has identified the need to expand LANL's 5,000-foot restriction to aircraft flights horizontally to include these

280

EIS-0246-SA-25: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis 5: Supplement Analysis EIS-0246-SA-25: Supplement Analysis Wildlife Mitigation Program BPA proposes to fund a portion of the cost of a conservation easement on 56,400 acres of land along the Fisher River to preclude development and protect riparian habitat. The land is owned by the Plum Creek Timber Company, and Montana Fish, Wildlife & Parks (MFWP) will own and monitor the perpetual easement. The goal of the project is to protect approximately 142,000 acres owned by Plum Creek Timber Company: 56,400 in the Fisher River valley and 86,000 in the Thompson River valley. The total cost for the easement over 142,000 acres is estimated at around $30 million. BPA will contribute $500,000 toward the smaller parcel in the Fisher River valley, for each of fiscal years 2002, 2003, and 2004, for a total of $1.5

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0285-SA-115: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Supplement Analysis 5: Supplement Analysis EIS-0285-SA-115: Supplement Analysis Transmission System Vegetation Management Program, Shelton-Fairmount # 1-4, Jefferson County, Washington Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.5 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 35

282

EIS-0246-SA-38: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0246-SA-38: Supplement Analysis Wildlife Mitigation Program, Flathead River System, Flathead County, Montana BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that current fisheries and natural resource values remain protected, and that no development or human encroachment would occur on these parcels, in perpetuity. No planned construction or improvements are currently proposed and the project does not involve fee title land acquisition. Protection will sustain quality aquatic habitats, water quality, and fish and wildlife habitat. Wetlands protected by this easement are priority wetlands in the basin, according to the Flathead Lakers Critical Lands Study.

283

EA-1562-SA-1: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

562-SA-1: Supplement Analysis 562-SA-1: Supplement Analysis EA-1562-SA-1: Supplement Analysis Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington Based on the information provided in this SA, DOE determined that no further NEPA documentation is required for the proposed actions with the analyzed PSF construction site and that the conclusions of the Finding of No Significant Impact signed on January 29, 2007 for the Final Environmental Assessment of the Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington, DOE/EA-1562, remain valid for this action. EA-1562-SA-1-2013.pdf More Documents & Publications EA-1562: Final Environmental Assessment

284

EIS-0246-SA-27: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46-SA-27: Supplement Analysis 46-SA-27: Supplement Analysis EIS-0246-SA-27: Supplement Analysis Wildlife Mitigation Program, Kalispell, Flathead County, Montana BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout and prevent hybridization with westslope cutthroat trout. Montana Fish, Wildlife & Parks (MFWP) will operate a fish trap downstream of the barrier for 6-10 consecutive years to manually remove the rainbow trout and hybrid spawners from the population. Removal of rainbow trout and hybrids from the stream will eradicate the existing hybrid population spawning in Abbot Creek and ultimately reduce the threat of hybridization in the Flathead River system. Pending completion of a successful disease screening and

285

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85-SA-128: Supplement Analysis 85-SA-128: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

286

EIS-0285-SA-108: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-108: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective

287

Review Draft Review Draft  

E-Print Network (OSTI)

Review Draft Review Draft Columbia Basin White Sturgeon Planning Framework Prepared a favorable review of specific sturgeon projects but noted that an effective basin-wide management plan passage. A planning framework (this document) was drafted based on a review and synthesis of published

288

Secretarial Review Draft Environmental Assessment/  

E-Print Network (OSTI)

Secretarial Review Draft Environmental Assessment/ Regulatory Impact Review/Initial Regulatory review draft Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis Flexibility Analysis For the Arctic Fishery Management Plan And Amendment 29 to the Fishery Management Plan

289

EIS-0285-SA-451: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Transmission System Vegetation Management Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-451 Carlton-Tillamook Transmission Line Corridor, PP&A-2068) BPA proposes to remove tall growing and noxious vegetation from the ROW, structure sites and access roads that can potentially interfere with the operation, maintenance, and reliability of the transmission line. All vegetation management activities will be performed in accordance with the BPA Master Agreement Statement of Work for Vegetation Control on Bonneville Power Administration Transmission Line Rights-of-Way and in accordance with the specific details identified in the vegetation management checklist and detail/prescription sheet. EIS-0285-SA-451-2011.pdf More Documents & Publications

290

Supplement Analysis of the 2005 Site-Wide EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy National Nuclear Security Administration Livermore Site Office Livermore, California SUPPLEMENT ANALYSIS of the 2005 Final Site-wide Environmental Impact Statement For Continued Operation of Lawrence Livermore National Laboratory Volume I: Main Report AUGUST 2011 DOE/EIS-0348-SA-03 i CONTENTS NOTATION.............................................................................................................................. v SUMMARY...........................................................................................................................S-1 1.0 INTRODUCTION ......................................................................................................... 1-1 1.1 Purpose and Need............................................................................................

291

Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 18, 2003 December 18, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) Ken Kirkman - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin Project No: 1998-007-03 Location: Union County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW). Description of the Proposed Action: The CTUIR and ODFW propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to

292

(DOE/EIS-0285/SA-5): Supplement Analysis for the Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 30, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-5) - Big Eddy-Ostrander...

293

EIS-0285-SA-452: Supplement Analysis | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Supplement Analysis for the Transmission System Vegetation Management Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-452 Ross-St. Johns No. 1) PP&A Project #2108 BPA proposes to clear unwanted vegetation along and adjacent to the transmission line corridor and access roads of the 230-kV Ross-St. Johns No. 1 transmission line corridor from Ross Substation to St. Johns Substation. Other lines that are present within the corridor are the 230-kV Ross-Rivergate No. 1; the 230-kV Ross-Alcoa No. 3; the 115-kV Ross-Alcoa No. 1, No. 2, and No. 4; and the 115-kV Ross-Carborundum No. 1 line. The ROW corridor in the proposed project area measures from 125 to 295 feet in width and crosses approximately nine miles of terrain through fee-owned, urban residential, rural residential, industrial, agricultural, and private

294

Finishing and Special Motifs: Lessons Learned from CRISPR Analysis Using Next-Generation Draft Sequences ( 7th Annual SFAF Meeting, 2012)  

ScienceCinema (OSTI)

Catherine Campbell on "Finishing and Special Motifs: Lessons learned from CRISPR analysis using next-generation draft sequences" at the 2012 Sequencing, Finishing, Analysis in the Future Meeting held June 5-7, 2012 in Santa Fe, New Mexico.

Campbell, Catherine [Noblis

2013-03-22T23:59:59.000Z

295

EIS-0310-SA-02: Notice of Availability of Supplement Analysis and  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Availability of Supplement Analysis and Notice of Availability of Supplement Analysis and Determination EIS-0310-SA-02: Notice of Availability of Supplement Analysis and Determination Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems DOE has completed a Supplement Analysis (SA) of the Programmatic Environmental Impact Statement for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure or NI PEIS) (DOE/EIS-0310) published in December 2000. In accordance with DOE's NEPA Implementing Procedures at 10 CFR 1021.314, DOE has determined that the SA has not identified substantial changes to the

296

EA-1895: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Assessment 5: Draft Environmental Assessment EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis. EA-1895-DEA-2013.pdf More Documents & Publications

297

EIS-0399: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a merchant 230-kV transmission line between Great Falls, Montana, and Lethbridge, Alberta, that would cross the U.S.-Canada border north of Cut Bank, Montana. The transmission line would transmit 300 megawatts (MW) of electric power south and 300 MW north. EIS-0399-DEIS-Summary-2008.pdf EIS-0399-DEIS-01a-2008.pdf EIS-0399-DEIS-01b-2008.pdf EIS-0399-DEIS-01c-2008.pdf EIS-0399-DEIS-01d-2008.pdf EIS-0399-DEIS-01e-2008.pdf EIS-0399-DEIS-02-2008.pdf More Documents & Publications EIS-0399: Final Environmental Impact Statement EIS-0399-SA-01: Supplement Analysis Management Alert: OAS-RA-12-01

298

EIS-0285-SA-65: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management along the Raymond - Cosmopolis Transmission Line would include danger tree removal within some areas adjacent to the right-of-way (ROW) (May 2002) Supplement...

299

EIS-0200-SA-03: Supplement Analysis | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Laboratory, Carlsbad Field Office (February 2008) More Documents & Publications EIS-0026-S2: Final Supplemental Environmental Impact Statement EIS-0200: Amendment to the...

300

Draft Supplement Analysis for Location(s) to Dispose of Depleted...  

National Nuclear Security Administration (NNSA)

Policy Act of 1969 NRC U.S. Nuclear Regulatory Commission NTS Nevada Test Site ORR Oak Ridge Reservation PCB polychlorinated biphenyl PEIS programmatic environmental impact...

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

BIGHORN SHEEP: SUPPLEMENTAL ANALYSIS TO THE FOREST PLAN ENVIRONMENTAL...  

NLE Websites -- All DOE Office Websites (Extended Search)

- Tied to secondary and supplemental waste treatment Updated 010513 Page 2 of 2 * TC & WM EIS Update (joint w RAP) - presentation on WMACPA, STOMP, Mod-flow, GW modeling (joint...

302

EIS-0285-SA-138: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Vegetation Management for portion of the Raver - Echo Lake 1 500 kV transmission line located from tower structure 41 to 131 (0285-SA-138) (April 2003) Supplement...

303

EIS-0265-SA-79: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

relocate 4,500 feet of existing dike along the Grande Ronde River, re-create native wetlands, relocate an existing powerline, and establish a riparian forest buffer. Supplement...

304

Analysis of Salmon and Steelhead Supplementation, 1990 Final Report.  

SciTech Connect

Supplementation or planting salmon and steelhead into various locations in the Columbia River drainage has occurred for over 100 years. All life stages, from eggs to adults, have been used by fishery managers in attempts to establish, rebuild, or maintain anadromous runs. This report summarizes and evaluates results of past and current supplementation of salmon and steelhead. Conclusions and recommendations are made concerning supplementation. Hatchery rearing conditions and stocking methods can affect post released survival of hatchery fish. Stress was considered by many biologists to be a key factor in survival of stocked anadromous fish. Smolts were the most common life stage released and size of smolts correlated positively with survival. Success of hatchery stockings of eggs and presmolts was found to be better if they are put into productive, underseeded habitats. Stocking time, method, species stocked, and environmental conditions of the receiving waters, including other fish species present, are factors to consider in supplementation programs. The unpublished supplementation literature was reviewed primarily by the authors of this report. Direct contact was made in person or by telephone and data compiled on a computer database. Areas covered included Oregon, Washington, Idaho, Alaska, California, British Columbia, and the New England states working with Atlantic salmon. Over 300 projects were reviewed and entered into a computer database. The database information is contained in Appendix A of this report. 6 refs., 9 figs., 21 tabs.

Miller, William H.; Coley, Travis C.; Burge, Howard L.

1990-09-01T23:59:59.000Z

305

DRAFT --DRAFT --DRAFT --DRAFT --DRAFT --Esodyp+: Prefetching in the Jackal Software DSM  

E-Print Network (OSTI)

DRAFT -- DRAFT -- DRAFT -- DRAFT -- DRAFT -- Esodyp+: Prefetching in the Jackal Software DSM-based Distributed Shared Memory (DSM) systems and discuss its implementation. In contrast to page-based DSMs, an object-based DSM distributes data on the level of objects, rendering current prefetchers for page

Genaud, Stéphane

306

DOE/EIS-0218-SA-3: Supplement Analysis for the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program (November 2004)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUPPLEMENT ANALYSIS FOR THE FOREIGN SUPPLEMENT ANALYSIS FOR THE FOREIGN RESEARCH REACTOR SPENT NUCLEAR FUEL ACCEPTANCE PROGRAM NOVEMBER 2004 DOE/EIS-0218-SA-3 U.S. Department of Energy National Nuclear Security Administration Washington, DC Final Supplement Analysis for the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program Final i TABLE OF CONTENTS Page 1. Introduction.............................................................................................................................................. 1 2. Background .............................................................................................................................................. 1 3. The Proposed Action ...............................................................................................................................

307

Sacramento Area Voltage Support Driaft Supplement Environmental Impact Statement and Environmental Impact Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sacramento Area Voltage Support Draft SEIS/EIR * Western Area Power Administration * Sierra Nevada Region Sacramento Area Voltage Support Draft SEIS/EIR * Western Area Power Administration * Sierra Nevada Region A-1 APPEN DIX A Alternatives Development A.1 INTRODUCTION Appendix A summarizes the process used to identify and screen project alternatives for the joint, draft Supplemental Environmental Impact Statement and Environmental Impact Report (Sacramento Area Voltage Support (SVS) Draft SEIS and EIR). Public involvement was used to develop and refine alternatives. Engineering considerations were the primary factor in eliminating several alternatives. A.2 ALTERNATIVES SELECTED FOR DETAILED ANALYSIS Western Area Power Administration (Western), Sacramento Municipal Utility District (SMUD), and the City of Roseville (Roseville) identified three transmission line segments between Western's

308

Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement (DOE/EIS-0317) (January 10, 2003)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Federal Register / Vol. 68, No. 7 / Friday, January 10, 2003 / Notices authorized to administer the NPDES Program incur a burden of 92,033 hours annually. Dated: January 6, 2003. James A. Hanlon, Director, Office of Wastewater Management. [FR Doc. 03-516 Filed 1-9-03; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6636-6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed December 30, 2002 Through January 03, 2003 Pursuant to 40 CFR 1506.9. EIS No. 030000, DRAFT EIS, FHW, TX, TX-121 Highway from Interstate Highway 30 to Farm-to-Market 1187 (FM 1187) in Forth Worth,

309

EIS-0225-SA-05: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components, Texas This SA will enable DOE's NNSA to determine whether the existing...

310

EIS-0285-SA-63: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Transmission System Vegetation Management Program, North Bonneville-Midway and Hanvor-Ostrander Vegetation Management on the North Bonneville-Midway and...

311

EIS-0285-SA-87: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Transmission System Vegetation Management Program Cowlitz Tap-Olympia White River Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed...

312

EIS-0285-SA-91: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Transmission System Vegetation Management Program Cowlitz Tap-Olympia White River Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed...

313

EIS-0285-SA-58: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Transmission System Vegetation Management Program Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of...

314

Microsoft Word - N01673_B100 AA final draft  

Office of Legacy Management (LM)

Draft Building 100 Area Draft Building 100 Area Plume Management Alternatives Analysis March 2012 LMS/PIN/N01673 This page intentionally left blank LMS/PIN/N01673 Pinellas County, Florida, Site Environmental Restoration Project Draft Building 100 Area Plume Management Alternatives Analysis March 2012 This page intentionally left blank U.S. Department of Energy Draft Building 100 Area Plume Management Alternatives Analysis March 2012 Doc. No. N01673 Page i Contents Abbreviations ................................................................................................................................. iv Executive Summary .........................................................................................................................v

315

SUPPLEMENT ANALYSIS OF TRANSURANIC WASTE CHARACTERIZATION AND REPACKAGING A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSURANIC WASTE CHARACTERIZATION AND REPACKAGING A TRANSURANIC WASTE CHARACTERIZATION AND REPACKAGING A C T I V I T I E S AT THE IDAHO NATIONAL ENGINEERING LABORATORY I N SUPPORT OF THE WASTE ISOLATION PILOT PLANT TEST PROGRAM P r e p a r e d by U.S. D e p a r t m e n t o f E n e r g y O f f i c e o f E n v i r o n m e n t a l R e s t o r a t i o n a n d W a s t e Management M a r c h 1 9 9 1 FOREWORD T h i s supplement a n a l y s i s has been prepared t o d e s c r i b e new i n f o r m a t i o n r e l e v a n t t o waste r e t r i e v a l , handling, and c h a r a c t e r i z a t i o n a t t h e Idaho N a t i o n a l E n g i n e e r i n g L a b o r a t o r y (INEL) and t o e v a l u a t e t h e need f o r a d d i t i o n a l documentation t o s a t i s f y t h e N a t i o n a l Environmental Pol i c y A c t (NEPA) - - 4 0 Code o f Federal R e g u l a t i o n s (CFR) 1502.9--and S e c t i o n C, P a r t 2, o f t h e U.S. Department o f Energy (DOE) NEPA G u i d e l i n e s (52 Federal R e g i s t e r [FR] 47662, Dece~iiber 15, 1987).

316

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-33)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2003 1, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-33) Ron Morinaka Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Gooderich Bayou Culvert Replacement (Hungry Horse Fisheries Mitigation Program) Project No: 1991-019-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals - Removal or Reduction of Undesirable Wildlife Species. Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife, and Parks (MFWP) Description of the Proposed Action: BPA is proposing to fund a fish barrier project with Montana Fish,

317

EIS (DOE/EIS-0246/SA-17) Supplement Analysis for the Wildlife Management Program EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 13, 2001 September 13, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) Joe HeHerrera - KEWU Fish and Wildlife Project Manager Proposed Action: Eagle Lakes Ranch Acquisition and Restoration Project No: 2000-025-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee-Title Acquisition Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service (USFWS), Columbia National Wildlife Refuge Description of the Proposed Action: BPA proposes to partially fund the acquisition of 7,630 acres

318

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-37)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 16, 2004 January 16, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-37) Charlie Craig - KEWU-4 Fish and Wildlife Project Manager Proposed Action: Blue Creek Winter Range - Spokane Reservation (Acquisition of Sampson, Lantzy, Allotment #0065-C, and Allotment 154 Properties) Project No: 1991-062-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.1 Fee Title Acquisition and Transfer Location: On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Proposed by: Bonneville Power Administration (BPA) and the Spokane Tribe of Indians Description of the Proposed Action: BPA proposes to fund the purchase of four parcels of land

319

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-35)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-35) Joe Deherrera Fish and Wildlife Project Manager Proposed Action: Malheur Wildlife Mitigation Project- Denny Jones Ranch Project No: 200002700 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.0 Plant Propagation Techniques; 4.0 Water Development and Management; 5.0 Water Distribution Techniques; 6.0 Fire Management Techniques (prompt fire suppression and fuels management, natural fire management), 7.0 Vegetation Management (herbicide, hand pulling, prescribed burns, water level manipulation); 8.2 Control of Predators and

320

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-25)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 11, 2002 June 11, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-25) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Purchase of Fisher River Conservation Easement (Fiscal Years 2002-2004) Project No: 2002-044-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: near Libby, Lincoln County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a portion of the cost of a conservation easement on 56,400 acres of land along the Fisher River to preclude development

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2004 14, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38) Joe DeHerrera Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Proposed Weaver Slough Conservation Easement Project No: 2002-042 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS [page A/2]): 1.2 Easement Acquisition Location: Flathead River System, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Flathead Land Trust Description of the Proposed Action: BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that

322

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2002 , 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91) Tom Morse, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat (Evans Creek Culvert Replacement) Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.13 Culvert removal/replacement to improve fish passage, 2.1 Maintain healthy riparian plant communities, 2.4 Provide filter strips to catch sediment and other pollutants, 2.6 Native seeds inventory, 2.7 Avoid exotic species, 7.2 Install hydraulic structures at low streamflows, 7.3 Minimize erosion

323

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 12, 2001 July 12, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57) Allyn Meuleman - KEWU Fish and Wildlife Project Manager Proposed Action: Idaho Fish Screening Improvement (Champion, Iron, Fourth of July, Goat Creeks) Project No: 1994-015-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish passage enhancement - fishways; 4.25 Consolidate/Replace irrigation diversion dams; 4.10 Water Conveyance: pipeline. Location: Stanley, Custer County, Idaho. Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game. Description of the Proposed Action: BPA proposes to fund a project that will enhance in-stream

324

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2002 19, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83) John Baugher Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Bear Creek Irrigation Siphon Project Project No: 1993-066-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities; 2.4 Provide Filter Strips to

325

EIS (DOE/EIS-0246-SA-24) Supplement Analysis for the Wildlife MitigationProgram EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2002 3, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-24) David Sill Fish and Wildlife Project Manager Proposed Action: Herbert Conservation Easement Project No: 1992-068-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: Benton County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Oregon Department of Fish and Wildlife (ODFW) Description of the Proposed Action: BPA proposes to purchase a conservation easement on approximately 221 acres of the Herbert parcel in Benton County, Oregon for the protection of wetland, riparian, and riverine habitats. The Herbert parcel is located within the Willamette

326

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 10, 2003 October 10, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36) Joe DeHerrera- KEWN-4 Fish and Wildlife Project Manager Proposed Action: Logan Valley Wildlife Mitigation Project-Implemetation of Wildlife Mitigation Plan Project No: 200000900 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.0 Plant Propagation Techniques; 4.0 Water Development and Management; 5.0 Water Distribution Techniques; 6.0 Fire Management Techniques (prompt fire suppression and fuels management, natural fire management), 7.0 Vegetation Management (herbicide, hand pulling, prescribed burns, water level manipulation); 8.0 Species Manangement

327

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

328

Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA - New Acclimation Sites  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 18, 2002 November 18, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA (DOE/EA-1282/SA-03) L. Hermeston - KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: New acclimation sites Project No: 1996-040-00 Location: Upper Wenatchee watershed, Chelan County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA is funding ongoing studies, research, and artificial production of coho salmon in the Wenatchee and Methow river basins. BPA analyzed environmental impacts of these activities in the Mid-Columbia Coho Reintroduction Feasibility Project Final EA, completed in April 1999 (DOE/EA-1282). Supplemental Analyses (DOE/EA-

329

Enforcement Guidance Supplement 05-01, Contractor Investigation, Causal Analysis, and Corrective Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2005 23, 2005 MEMORANDUM FOR: DOE AND CONTRACTOR PRICE-ANDERSON AMENDMENTS ACT COORDINATORS FROM: STEPHEN M. SOHINKI DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. Such guidance is typically issued in the form of an Enforcement Guidance Supplement (EGS). As part of the investigation of potential nuclear safety noncompliances, OE routinely reviews the contractor's investigation of the noncompliance, the associated causal

330

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

331

Supplement to The Imnaha Subbasin Plan Introduction  

E-Print Network (OSTI)

2004 draft Imnaha Subbasin Assessment and Imnaha Subbasin Management Plan (available at www in these documents. This supplement was reviewed by the Imnaha Technical and Planning Teams during the fall of 2004. This supplement is presented in four sections that correspond to information requested by the Northwest Power

332

First draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group By The Regulatory Assistance Project Bob Anderson Associate Draft January 15, 2004 Transmission Planning: Institutional Issues in the West Page i Table of Contents Introduction......................................................................................................................... 1 Background-The Existing Transmission Planning Landscape......................................... 3 Interconnection-wide Transmission Planning ................................................................ 3 Seams Steering Group-Western Interconnection (SSG-WI) ...................................... 3 Western Electricity Coordinating Council (WECC)...................................................

333

Supplement Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

blank. SUMMARY In December 1992, the U.S. Department of Energy (DOE) issued the Final Environmental Impact Statement (EIS) on Decommissioning of Eight Surplus Production...

334

INTERNET-DRAFT draft-goyal-diffserv-afstdy-00 February 2000 Internet Engineering Task Force Mukul Goyal  

E-Print Network (OSTI)

INTERNET-DRAFT draft-goyal-diffserv-afstdy-00 February 2000 Internet Engineering Task Force Mukul Goyal Internet Draft Arian Durresi Expires: August 2000 Raj Jain Chunlei Liu The Ohio State University February 2000 Performance Analysis of Assured Forwarding Status of Memo This document is an Internet

Jain, Raj

335

Secretarial Review Draft REGULATORY IMPACT REVIEW  

E-Print Network (OSTI)

Secretarial Review Draft REGULATORY IMPACT REVIEW and FINAL REGULATORY FLEXIBILITY ANALYSIS For a proposed Regulatory Amendment to Implement Amendment 78 to the Fishery Management Plan for Gulf of Alaska Groundfish June 2009 #12;Post-delivery Transfers ­ Secretarial review draft June 2009 Central Gulf of Alaska

336

Draft Genome Sequence  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Draft Genome Sequence of Serratia sp. Strain ATCC 39006, a Model Bacterium for Analysis of the Biosynthesis and Regulation of Prodigiosin, a Carbapenem, and Gas Vesicles Peter C. Fineran, a Marina C. Iglesias Cans, a Joshua P. Ramsay, b Nabil M. Wilf, b Desiree Cossyleon, a Matthew B. McNeil, a Neil R. Williamson, b Rita E. Monson, b S. Anette Becher, c Jo-Ann L. Stanton, d Kim Brügger, e Steven D. Brown, f George P. C. Salmond b Department of Microbiology and Immunology, University of Otago, Dunedin, New Zealand a ; Department of Biochemistry, University of Cambridge, Cambridge, United Kingdom b ; AgResearch Ltd., Invermay Agricultural Centre, Mosgiel, New Zealand c ; Department of Anatomy, University of Otago, Dunedin, New Zealand d ; EASIH, University of Cambridge, Addenbrooke's Hospital, Cambridge, United Kingdom e ; Biosciences Division, Oak Ridge National Laboratory, Oak Ridge,

337

DRAFT ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/  

E-Print Network (OSTI)

DRAFT ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ INITIAL REGULATORY FLEXIBILITY ANALYSIS: This Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis (EA For Amendments to the Fishery Management Plan (FMP) for Groundfish of the Bering Sea and Aleutian Islands

338

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)  

SciTech Connect

BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

N /A

2001-05-01T23:59:59.000Z

339

Transatlantic Divergences in Citizen Science EthicsComparative Analysis of the DIYbio Code of Ethics Drafts of 2011  

Science Journals Connector (OSTI)

Codes of ethics were drafted by participants in the European and North American Congresses of DIYbio, a single global organization of informal biotechnology practitioners, in 2011. In general, the existence of...

Kathleen Eggleson

2014-08-01T23:59:59.000Z

340

DOE/EIS-0026-SA-06: Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers (9/25/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers September 2007 U.S. Department of Energy Carlsbad Field Office Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers ii This page intentionally blank Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers iii TABLE OF CONTENTS Section Page 1.0 INTRODUCTION...........................................................................................................1 2.0 PURPOSE AND NEED FOR ACTION...........................................................................1 3.0 PROPOSED ACTION.....................................................................................................1

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Draft Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

SciTech Connect

This ''Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement'' (LLNL SW/SPEIS) describes the purpose and need for agency action for the continued operation of LLNL and analyzes the environmental impacts of these operations. The primary purpose of continuing operation of LLNL is to provide support for the National Nuclear Security Administration's (NNSA's) nuclear weapons stockpile stewardship missions. LLNL, located about 40 miles east of San Francisco, California, is also needed to support other U.S. Department of Energy (DOE) programs and Federal agencies such as the U.S. Department of Defense, Nuclear Regulatory Commission, U.S. Environmental Protection Agency (EPA), and the newly established U.S. Department of Homeland Security. This LLNL SW/SPEIS analyzes the environmental impacts of reasonable alternatives for ongoing and foreseeable future operations, facilities, and activities at LLNL. The reasonable alternatives include the No Action Alternative, Proposed Action, and the Reduced Operation Alternative. The major decision to be made by DOE/NNSA is to select one of the alternatives for the continued operation of the LLNL. As part of the Proposed Action, DOE/NNSA is considering: using additional materials including plutonium on the National Ignition Facility (NIF); increasing the administrative limit for plutonium in the Superblock, which includes the Plutonium Facility, the Tritium Facility, and the Hardened Engineering Test Building; conducting the Integrated Technology Project, using laser isotope separation to provide material for Stockpile Stewardship experiments, in the Plutonium Facility; increasing the material-at-risk limit for the Plutonium Facility; and increasing the Tritium Facility material-at-risk. A discussion of these issues is presented in Section S.5.2, Proposed Action. The ''National Environmental Policy Act'' (NEPA) establishes environmental policy, sets goals, and provides means for implementing the policy. NEPA contains provisions to ensure that Federal agencies adhere to the letter and spirit of the Act. The key provision requires preparation of an environmental impact statement on ''major Federal actions significantly affecting the quality of the human environment'' (40 ''Code of Federal Regulations'' [CFR] {section}1502.3). NEPA ensures that environmental information is available to public officials and citizens before decisions are made and actions are taken (40 CFR {section}1500.1[b]). DOE has a policy to prepare sitewide environmental impact statements documents for certain large, multiple-facility sites such as LLNL (10 CFR {section}1021.330). In August 1992, DOE released the ''Final Environmental Impact Statement and Environmental Impact Report for Continued Operations of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore'' (LLNL EIS/EIR). A Record of Decision (ROD) (58 ''Federal Register'' [FR] 6268) was issued in January 1993. With the passage of more than 10 years since the publication of the 1992 LLNL EIS/EIR (DOE/EIS-0157) and because of proposed modifications to existing projects and new programs, NNSA determined that it was appropriate to prepare a new LLNL SW/SPEIS.

N /A

2004-02-27T23:59:59.000Z

342

Final Supplement Analysis for the Site-Wide Environmental Impact Statement for the Sandia National Laboratories, Sandia, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81-SA-04 81-SA-04 Final Supplement Analysis for the Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico August 2006 U.S. Department of Energy National Nuclear Security Administration Sandia Site Office This page intentionally left blank COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY/NATIONAL NUCLEAR SECURITY ADMINISTRATION TITLE: Final Supplement Analysis for the Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281-SA-04) CONTACT: For further information concerning this Supplement Analysis, contact Ms. Susan Lacy Environmental Team Leader Sandia Site Office National Nuclear Security Administration P. O. Box 5400 Albuquerque, New Mexico 87185-5400 Phone: (505) 845-5542

343

DOE/EIS-0265-SA-165: Supplement Analysis for the Watershed Management Program EIS (8/4/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 4.12 Filter Strips, 6.1 Differed Grazing, 6.10 Access Fencing Location: Custer County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

344

Supplement Analyses (SA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis Proposed Silo 3 Alternatives at the FEMP March 1, 1991 EIS-0026-SA-01: Supplement Analysis Transuranic Waste Characterization And Repackaging...

345

Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

e Electronic Form Approved by CILR - 09/26/2001 e Electronic Form Approved by CILR - 09/26/2001 (8-89) memorandum DATE: May 24, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-04) Scott Wilson - PT-5 TO: Customer Account Executive Proposed Action: Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093. Proposed By: Bonneville Power Administration (BPA) and Northwestern Windpower, LLC. Location: Near Wasco, Sherman County, Oregon. Description of the Proposed Action: BPA proposes to purchase 24 megawatts (MW) of wind power from the Klondike Wind Project for a term of 20 years. Analysis: The existing 24-MW Klondike Wind Project, owned and operated by Northwestern Windpower,

346

Supplement Analysis for the System Operation Review EIS (DOE/EIS-0170/SA-1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the System Operation Review EIS (DOE/EIS-0170/SA-1) Anthony G. White - PGPL-5 Public Utility Specialist and Secretary, United States Entity Proposed Action: Non-Treaty Storage Agreement (NTSA) - Contract Extension, Contract Number DE-MS79- 90BP92754. Proposed By: Bonneville Power Administration (BPA) and B.C. Hydro and Power Authority (BC Hydro). Location: British Columbia, Canada. Description of the Proposed Action: BPA and BC Hydro propose to extend the existing NTSA for a period of one year. Analysis: On July 5, 1990, BPA and BC Hydro signed the NTSA, which expanded the amount of non- Treaty storage space available in Canada and extended the then-existing agreement from 1993 to

347

Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project  

SciTech Connect

The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation.

NONE

1998-06-23T23:59:59.000Z

348

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

349

EIS-0442: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

2: EPA Notice of Availability of Draft Environmental Impact 2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska. EIS-0442-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0389: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

350

EIS-0431: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA EPA announces the availability of the Draft Environmental Impact Statement for the Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. EIS-0431-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0460: EPA Notice of Availability of Final Environmental Impact

351

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Advanced Nuclear Energy Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS DRAFT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION...

352

DRAFT AGENDA Measurement Science & Standards in Forensic Firearms  

E-Print Network (OSTI)

DRAFT AGENDA Measurement Science & Standards in Forensic Firearms Analysis July 10-11, 2012 Enforcement Standards Office, Forensic Science Program · Scientific Working Group for Firearms and Toolmarks

353

SECRETARIAL REVIEW DRAFT REGULATORY IMPACT REVIEW /  

E-Print Network (OSTI)

SECRETARIAL REVIEW DRAFT REGULATORY IMPACT REVIEW / INITIAL REGULATORY FLEXIBILITY ANALYSIS....................................................................................................................................... 1 2 Regulatory Impact Review For a proposed Amendment to the Fishery Management Plan for Groundfish of the Gulf of Alaska to Remove

354

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

355

Biomass 2014 Draft Agenda | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Biomass 2014 Draft Agenda Biomass 2014 Draft Agenda The following document is a draft agenda for the Biomass 2014: Growing the Future Bioeconomy conference. Biomass 2014 Draft...

356

XII.1-Draft ATTACHMENT XII  

E-Print Network (OSTI)

XII.1-Draft ATTACHMENT XII Review of Fischer-Tropsch Work by Gulf Oil The Gulf-Badger process leads analysis conducted by Gulf Oil, and later the process and engineering design provided by Badger (XII.1). A simplified process scheme is shown in XII.1 (XII.2). The process was first discovered from exploratory work

Kentucky, University of

357

Supplement analysis for a container system for the management of DOE spent nuclear fuel located at the INEEL  

SciTech Connect

The Council on Environmental Quality (CEQ) regulations for implementing the NEPA, 40 CFR 1502.9 (c), directs federal agencies to prepare a supplement to an environmental impact statement when an agency makes substantial changes in the Proposed Action that are relevant to environmental concerns, or there are significant new circumstances or information relevant to environmental concerns and bearing on the Proposed Action or impacts. When it is unclear whether a supplemental environmental impact statement is required, DOE regulations (10 CFR 1021.314) direct the preparation of a supplement analysis to assist in making that determination. This supplement analysis evaluates the impacts of employing dual-purpose canisters (DPCs) to prepare DOE SNF located at the INEEL for interim onsite storage and transport outside the State of Idaho. Impacts associated with DPC manufacturing, loading and storage of DOE-ID SNF into DPCs, transport of loaded DPCs outside Idaho, and the cumulative impacts are compared with the impacts previously analyzed in the SNF and INEL EIS and the Navy Container System EIS. This SA provides information to determine whether: (1) an existing EIS should be supplemented; (2) a new EIS should be prepared; or (3) no further NEPA documentation is required.

NONE

1999-03-12T23:59:59.000Z

358

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

359

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

360

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-29)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-29) Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-29) Charlie Craig - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Blue Creek Winter Range - Spokane Reservation (Acquisition of Smith and Parsons Properties) Project No: 1991-062-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.1 Fee Title Acquisition and Transfer Location: On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Proposed by: Bonneville Power Administration (BPA) and the Spokane Tribe of Indians Description of the Proposed Action: BPA proposes to fund the purchase of three parcels of land within the boundaries of the Spokane Indian Reservation, totaling approximately 870 acres.

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

362

Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2003 2, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01) TO: Greg Baesler Project Manager - KEWU-4 Proposed Action: Colville Resident Trout Hatchery Project-Modifications to original proposal Project No.: 1985-038-00 Location: Colville Indian Reservation, Okanogan County, Washington Proposed by: Bonneville Power Administration (BPA) Introduction: The Bonneville Power Administration prepared an Environmental Assessment (DOE/EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a

363

Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 28, 2004 May 28, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-06) Deb Malin Project Manager - PT-5 Proposed Action: Memorandum of Agreement between Bonneville Power Administration (BPA) and Bonneville Environmental Foundation (BEF) to help support BEF's renewable resources activities. Location: Unknown at this time, but likely throughout the Pacific Northwest. Proposed by: BPA and BEF. Description of the Proposed Action: BPA proposes to enter into a Memorandum of Agreement (MOA) to provide annual funding to the BEF. The BEF is a non-profit organization that supports watershed restoration programs and development of new sources of renewable energy, such as wind, solar, hydro, and landfill gas, in the Pacific Northwest. The MOA would

364

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

365

EIS-0403-S1: DOE and BLM Notice of Availability of the Supplement to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE and BLM Notice of Availability of the Supplement DOE and BLM Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: DOE and BLM Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is EIS-0403D-S1. Project website: http://solareis.anl.gov. The Bureau of Land Management (BLM) and the Department of Energy (DOE) (the Agencies) as joint lead agencies announce the availability of the Supplement to the Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern States (Supplement) (BLM/DES 11-49, DOE/EIS-0403D-S). Public meetings on the Supplement to the Draft Solar PEIS were held in November and December 2011 in Las Vegas, NV; Phoenix, AZ; El Centro, CA,

366

UK FT PDU Facility Draft EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2S 2S Draft Supplemental Environmental Assessment for University of Kentucky Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis Lexington, KY December 2013 Prepared for: Department of Energy National Energy Technology Laboratory This page intentionally left blank. Draft Supplemental Environmental Assessment DOE/EA-1642S Fischer-Tropsch Process Development Unit December 2013 Cover Sheet Proposed Action: The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with the University of Kentucky (UK) Center for Applied Energy Research (CAER), to partially fund the completion of the design, construction, and operation of a small-scale pilot plant for research related to the gasification of coal

367

Supplemental Figures: Figure S1. Analysis of endo-siRNA targets in different microarray datasets. The  

E-Print Network (OSTI)

Supplemental Figures: Figure S1. Analysis of endo-siRNA targets in different microarray datasets. The percentage of each array dataset that were predicted endo-siRNA targets according to the Ambros dataset (Lee et al. 2006) was plotted [(number of endo-siRNA targets in microarray dataset / total genes

Bass, Brenda L.

368

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

369

Draft Surplus Plutonium Disposition Supplemental Environmental...  

National Nuclear Security Administration (NNSA)

In addition, concerns about criticality would limit the loading in the waste storage tanks and would not support vitrification of 13.1 metric tons (14.4) tons of plutonium....

370

Draft Surplus Plutonium Disposition Supplemental Environmental...  

National Nuclear Security Administration (NNSA)

materials production activities at SRS have produced HLW that is stored on site in tanks. The function of DWPF is to vitrify the low-volume, high- activity radioactive...

371

Draft Surplus Plutonium Disposition Supplemental Environmental...  

National Nuclear Security Administration (NNSA)

In addition, concerns about criticality would limit the loading in the waste storage tanks and would not support vitrification of 13.1 metric tons (14.4 tons) of plutonium....

372

Draft Complex Transformation Supplemental Programmatic Environmental...  

Office of Environmental Management (EM)

which analyzed programmatic alternatives for the weapons complex in the absence of nuclear testing. NNSA maintains the safety, security, and reliability of nuclear weapons...

373

Draft-O-Meter  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will learn an easy technique to measure the presence of drafts in their homes and classrooms.

374

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network (OSTI)

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

375

Supplement Analyses (SA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 20, 2003 March 20, 2003 EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program March 19, 2003 EIS-0285-SA-132: Supplement Analysis Transmission System Vegetation Management Program March 12, 2003 EIS-1069-SA-06: Supplement Analysis Yakima/Kilickitat Fisheries Project March 10, 2003 EIS-0225-SA-03: Supplement Analysis Continued Operation of the National Nuclear Security Administration, Pantex Plant and Associated Storage of Nuclear Weapon Components March 10, 2003 EIS-0285-SA-130: Supplement Analysis Transmission System Vegetation Management Program March 7, 2003 EIS-0285-SA-129: Supplement Analysis Transmission System Vegetation Management Program March 6, 2003 EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program

376

Supplement Analyses (SA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2001 September 14, 2001 EIS-0265-SA-62: Supplement Analysis Watershed Management Program and the Hood River Fisheries Project September 13, 2001 EIS-0246-SA-17: Supplement Analysis Wildlife Management Program September 11, 2001 EIS-0285-SA-26: Supplement Analysis Transmission System Vegetation Management Program September 5, 2001 EIS-0285-SA-28: Supplement Analysis Transmission System Vegetation Management Program September 5, 2001 EIS-0285-SA-25: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-23: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-22: Supplement Analysis Transmission System Vegetation Management Program, King and Snohomish Counties, WA, in the Snohomish Region

377

DOE/EIS-0251; Supplemental Analysis For a Container System for the Management of DOE Spent Nuclear Fuel Located at the INEEL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID-10636 ID-10636 SUPPLEMENT ANALYSIS FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF DOE SPENT NUCLEAR FUEL LOCATED AT THE INEEL March 1999 U.S. Department of Energy Idaho Operations Office Idaho Falls, Idaho DOE/ID-10636 SUPPLEMENT ANALYSIS FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF DOE SPENT NUCLEAR FUEL LOCATED AT THE INEEL March 1999 Department of Energy Idaho Operations Office Idaho Falls, Idaho SNF Supplement Analysis ii March 1999 CONTENTS Acronyms and Abbreviations .............................................................................................. v Summary ..........................................................................................................................S-1 1.0 Purpose and Proposed Action ......................................................................................

378

EIS-0283-S1: Supplement to the Surplus Plutonium Disposition Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Supplement to the Surplus Plutonium Disposition 3-S1: Supplement to the Surplus Plutonium Disposition Environmental Impact Statement EIS-0283-S1: Supplement to the Surplus Plutonium Disposition Environmental Impact Statement SUMMARY The Supplement evaluates the potential environmental impacts of using MOX fuel in these six specific reactors named in the DCS proposal as well as other program changes made since the SPD Draft EIS was published. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD November 5, 1999 EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management November 5, 1999 EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

379

Tatum Dome field study report and monitoring data analysis: A supplemental report  

SciTech Connect

This report is a supplement to the Water Resources Center, Desert Research Institute report, DOE/NV/10384-03, ``Tatum Dome Field Study Report and Monitoring Data Analysis,`` Water Resources Center Publication No. 45044. The field study was initiated during the Spring of 1984 because of persistent tritium concentrations in the Surficial Aquifer determined from observed annual water samples from the series of hydrologic monitoring holes (HMH). An anomalous increase in tritium concentrations in monthly water samples from some of the hydrologic monitoring holes was also observed during the Spring of 1984 by the State of Mississippi, Division of Radiological Health. This Spring increase in tritium concentrations may well have been present earlier, but was not recognized because monthly tritium concentration data were not collected prior to 1984. It is hypothesized that groundwater in the Surficial Aquifer is made up of two layers. The older and deeper water within the Surficial Aquifer contains tritium contamination. The shallower water, infiltrating from recent precipitation, is essentially tritium free. These waters do not naturally mix completely and are only significantly mixed in the hydrologic monitoring holes by the sampling procedure. The quantity of shallow infiltrating precipitation available for mixing varies inversely with the rate of evapotranspiration. Since dispersive mixing along the boundary between the two waters also occurs as a result of groundwater movement, the average concentration of tritium in the Surficial Aquifer is decreased by dilution as well as radioactive decay.

Fenske, P.R.

1989-09-01T23:59:59.000Z

380

Tatum Dome field study report and monitoring data analysis: A supplemental report  

SciTech Connect

This report is a supplement to the Water Resources Center, Desert Research Institute report, DOE/NV/10384-03, Tatum Dome Field Study Report and Monitoring Data Analysis,'' Water Resources Center Publication No. 45044. The field study was initiated during the Spring of 1984 because of persistent tritium concentrations in the Surficial Aquifer determined from observed annual water samples from the series of hydrologic monitoring holes (HMH). An anomalous increase in tritium concentrations in monthly water samples from some of the hydrologic monitoring holes was also observed during the Spring of 1984 by the State of Mississippi, Division of Radiological Health. This Spring increase in tritium concentrations may well have been present earlier, but was not recognized because monthly tritium concentration data were not collected prior to 1984. It is hypothesized that groundwater in the Surficial Aquifer is made up of two layers. The older and deeper water within the Surficial Aquifer contains tritium contamination. The shallower water, infiltrating from recent precipitation, is essentially tritium free. These waters do not naturally mix completely and are only significantly mixed in the hydrologic monitoring holes by the sampling procedure. The quantity of shallow infiltrating precipitation available for mixing varies inversely with the rate of evapotranspiration. Since dispersive mixing along the boundary between the two waters also occurs as a result of groundwater movement, the average concentration of tritium in the Surficial Aquifer is decreased by dilution as well as radioactive decay.

Fenske, P.R.

1989-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) (5/20/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) Joe DeHerrera Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Eisminger/ CREP Dike Relocation Project No: 1992-026-01 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 2.1 Maintain Healthy Riparian Plant Communities, 2.3 Creation of Wetlands to Provide Near Channel Habitat and Store Water for Land Use, 2.7 Avoid Exotic Species, 2.4 Provide Filter Strips to Catch Sediment and Other Pollutants, 6.1 Deferred Grazing. Location: Union County, Oregon

382

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) Jay Marcotte Fish and Wildlife Project Manager Proposed Action: Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin. Project No: 2001-039-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Various Walla Walla River Basin Irrigation Diversions, Washington Proposed by: Bonneville Power Administration (BPA), the Walla Walla County Conservation District. Description of the Proposed Action: BPA is proposing to provide cost share for a program that

383

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) (10/29/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2001 29, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) Alan Ruger Fish and Wildlife Project Manager Proposed Action: Duncan Creek Channel Rehabilitation Project Project No: 2001-053-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.11 Remove Debris Functioning as Barrier to Passage, 1.16 Spawning Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 2.9 Mechanical Vegetation Control. Location: Skamania County, Washington. Proposed by: Bonneville Power Administration (BPA), and the Washington State Department of Fish and Wildlife (WDFW)

384

(DOE/EIS-0265/SA-102): Supplement Analysis for the Watershed Management Program EIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-102) David Byrnes, KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Tributary Access and Habitat Program - Ellensburg Water Company/ Cooke Creek Diversion Project Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.15 Fish Passage Enhancement - Fishways; 2.1 Maintain Healthy Riparian Plant Communities; 4.10 Water Conveyance - Pipeline; 4.20 Water

385

(DOE/EIS-0246/SA-23): Supplement Analysis for the Wildlife Mitigation Program EIS 5/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2002 15, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-23) David Sill Fish and Wildlife Project Manager Proposed Action: Canby Ferry Conservation Easement Project No: 1992-068-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Oregon Department of Fish and Wildlife (ODFW) Description of the Proposed Action: BPA proposes to purchase a conservation easement on approximately 16 acres of the Canby Ferry parcel in Clackamas County, Oregon for the protection

386

DOE/EIS-0265-SA-166: Supplement Analysis for the Watershed Management Program EIS (8/6/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2004 6, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-166) Jay Marcotte Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Idaho Model Watershed Habitat Projects - Coleman Creek Fish Passage Restoration Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection Using Bioengineering Methods, 1.13 Culvert Removal/Replacement to Improve Fish Passage, 1.16 Spawning Habitat Enhancements, 2.6 Native Seed Inventories, 2.7 Avoid Exotic Species, 2.9 Mechanical Vegetation Removal, 4.2 Water Measuring

387

EIS(DOE/EIS-0246/SA-19) Supplement Analysis for the Wildlife Mitigation Program EIS 12/12/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 12, 2001 December 12, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-19) David Sill, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Bader Property Acquisition Project No: 1992-061-06 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition. Location: St. Joe Watershed on the Coeur d'Alene Indian Reservation, Idaho Proposed by: Bonneville Power Administration (BPA) and the Coeur d'Alene Tribe Description of the Proposed Action: BPA proposes to purchase approximately 650 acres of private property that border the St. Joe River near Goose Heaven Lake on the Coeur d'Alene Indian Reservation

388

(DOE/EIS-0265/SA-100): Supplement Analysis for the Watershed Management Program EIS 11/25/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 25, 2002 November 25, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-100) Tracey Yerxa TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Oregon Fish Screening Project, Screen Replacements 2003 Project No: 1993-066-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements;

389

(DOE/EIS-0265/SA-88): Supplement Analysis for the Watershed Management Program EIS (08/26/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2002 6, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-88) John Baugher, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: John Day Watershed Restoration (2002-2003) Project No: 1998-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.2 Water Measuring Devices; 4.10 Water Conveyance Pipeline; 4.25 Consolidate / Replace Irrigation Diversion Dams; 6.5 Water Supply: Pipeline. Location: Canyon City, Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm Springs Reservation of Oregon.

390

(DOE/EIS-0246/SA-28): Supplement Analysis for the Wildlife Mitigation Program EIS 7/24/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 24, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-28) David Byrnes Fish and Wildlife Project Manager Proposed Action: Lower Naches River Land Acquisition, Yakima River Side Channels Project Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources Location: Yakima County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase four parcels of private land that total approximately 125 acres located in south-central Washington along the Naches River in Yakima County. Following acquisition, title to the land will be held by The Yakama Nation. The goal of this project

391

DOE/EIS-0265-SA-163: Supplement Analysis for the Watershed Management Program EIS (8/04/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-163) John Baugher TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: John Day Watershed Restoration Program Project No: 1998-018-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 4.2 Water Measuring Devices 4.10 Water Conveyance Pipeline, 4.25 Consolidate/Replace Irrigation Diversion Dams, 6.5 Water Supply: Pipeline, 6.10 Access: Fencing; 8.13 Stand Thinning; 8.15 Manage Stands to Enhance Snowpack Location: Sites within the John Day River Watershed, in Wheeler County and Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm

392

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-69) (11/15/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS, (DOE/EIS-0265/SA-69) Linda Hermeston - KEWL Fish and Wildlife Project Manager Proposed Action: Improvement of Anadromous Fish Habitat and Passage in Omak Creek Project No: 2000-001-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.9 Structural bank protection using bioengineering methods; 1.13 Culvert Removal/Replacement to improve fish passage; 1.16 Spawning habitat enhancements; 1.17 Rearing habitat enhancement.

393

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) (9/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2001 7, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Pelican Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Pelican Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

394

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-32) 5/20/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 20, 2003 May 20, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-32) Joe DeHerrera, KECU-4 TO: Fish and Wildlife Project Manager Proposed Action: Zumwalt Prairie Preserve Conservation Easement Project No: 2001-043-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques-1.2 Easement Acquisition. Location: Wallowa County, Oregon Proposed by: Bonneville Power Administration (BPA) and The Nature Conservancy Description of the Proposed Action: BPA proposes to purchase a conservation easement on the Zumwalt Prairie Preserve, which is currently owned by The Nature Conservancy. The

395

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) (5/9/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2002 May 9, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II (modification to DOE/EIS-0265/SA-72). Project No: 1997-051-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase approximately 310 acres of privately-owned

396

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66) (10/4/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04, 2001 04, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66) John Baugher - KEW-4 Tom Morse - KEW-4 Fish and Wildlife Project Managers Proposed Action: Water Right Acquisition Program Project No: 2001-023-00 (Fifteenmile Subbasin Water Right Acquisition Program) 1999-008-00 (Columbia Plateau Water Right Acquisition Program) 2001-056-00 (Trout Creek 2001 Streamflow Enhancement) 2001-069-00 (John Day Basin Stream Enhancement Project, Summer 2001) Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18 Purchase / Negotiate Water Right; 4.19 File for Instream Water Right.

397

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) (10/23/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2001 23, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase I. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA proposes to purchase 4 privately owned parcels totaling

398

DOE/EIS-0265-SA-164: Supplement Analysis for the Watershed Management Program EIS (8/2/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2004 , 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-164) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - L-9 Irrigation Diversion Modification Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways, 4.1 Irrigation Water Management, 4.2 Water Measuring Devices, 4.23 Intake and Return Diversion Screens, 4.25 Consolidation/Replace Irrigation Diversion Dams Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District

399

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) (8/14/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) David Byrnes Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Reestablish Safe Access into Tributaries of the Yakima Subbasin, Tucker Creek Fish Passage Project Project No: 98-034-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways/Screening, 1.16 Spawning Habitat Enhancements, 1.17 Rearing Habitat Enhancements, 1.5 Install Grade Control Structures and Check Dams. Location: Tucker Creek, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Fisheries

400

EIS(DOE/EIS-0246/SA-20) Supplement Analysis for the Wildlife Mitigation Program EIS 3/7/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 7, 2002 March 7, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-20) Allyn Meuleman, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Camas Prairie Acquisition, Anderson Ranch Dam Phase II Project No: 1995-057-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Camas and Elmore Counties, Idaho Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game (IDFG) Description of the Proposed Action: BPA proposes to purchase approximately 1,370 acres of

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68)(10/12/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2001 12, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Mill Creek and Little Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Mill Creek and Little Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

402

(DOE/EIS-0265/SA-101): Supplement Analysis for the Watershed Management EIS 1/2/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2003 , 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-101) Mark Shaw, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Restoration of Anadromous Fish Access to Hawley Creek Project No: 2001-052-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18: Purchase / Negotiate Water Right Location: Lemhi, Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District, with the cooperation of the Idaho Governor's Office of Species Conservation. Description of the Proposed Action: BPA proposes to fund a project to enhance fish habitat on

403

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/28/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 28, 2002 June 28, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-27) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Abbot Creek Fish Barrier Project (Hungry Horse Mitigation / Habitat Improvements) Project No: 1991-19-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals Location: Kalispell, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout

404

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72)(12/3/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 3, 2001 December 3, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase 2 privately owned parcels

405

(DOE/EIS-0246/SA-26): Supplement Analysis for the Wildlife Mitigation Program EIS (07/3/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2002 3, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-26) David Sill Fish and Wildlife Project Manager Proposed Action: Windy Bay Property Acquisition Project No: 1990-044-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Kootenai County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Coeur d'Alene Tribe Description of the Proposed Action: BPA proposes to purchase approximately 150 acres of land located at the mouth of Lake Creek on Lake Coeur d'Alene on the Coeur d'Alene Indian Reservation in Kootenai County, Idaho. Title to the land will be held by the Coeur d'Alene

406

DOE/EIS-0246-SA-16: Supplement Analysis for the Wildlife Mitigation Program EIS (8/9/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2001 9, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-16) Brad Miller, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Johnson Property Acquisition Project No: 1992-061-06 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition. Location: Benewah Watershed on the Coeur d'Alene Indian Reservation, Idaho Proposed by: Bonneville Power Administration (BPA) and the Coeur d'Alene Tribe Description of the Proposed Action: BPA proposes to purchase three parcels totaling 411 acres of private property on the Coeur d'Alene Indian Reservation as partial mitigation for

407

Supplement Analysis for the Watrshed Management Program EIS (DOE/EIS-0265/SA-75) (2/20/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) Peter Lofy - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Gourlay Creek Fish Ladder Project Project No: 2001-038-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) and the City of Scappoose Description of the Proposed Action: BPA proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of

408

EIS (DOE/EIS-0246/SA-18) Supplement Analysis for the Watershed Management Program EIS 10/17/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: October 17, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-18) Charlie Craig - KEWU Fish and Wildlife Project Manager Proposed Action: Eugene Wetlands Acquisition Phase II Project No: 1992-059-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee- Title Acquisition, 1.2 Easement Acquisition. Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) and The Nature Conservancy Description of the Proposed Action: BPA proposes to fund the acquisition and preservation of approximately 99 acres of native wet prairie and oak woodland habitat in Lane County, Oregon.

409

DOE/EIS-0240-SA-1: Supplement Analysis for the Disposition of Surplus Highly Enriched Uranium (October 2007)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-SA1 0-SA1 SUPPLEMENT ANALYSIS DISPOSITION OF SURPLUS HIGHLY ENRICHED URANIUM October 2007 U.S. Department of Energy National Nuclear Security Administration Office of Fissile Materials Disposition Washington, D.C. i TABLE OF CONTENTS 1.0 Introduction and Purpose .................................................................................................................1 2.0 Background......................................................................................................................................1 2.1 Scope of the HEU EIS............................................................................................................ 2 2.2 Status of Surplus HEU Disposition Activities .......................................................................

410

EA-1792-S1: Final Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-S1: Final Supplemental Environmental Assessment 2-S1: Final Supplemental Environmental Assessment EA-1792-S1: Final Supplemental Environmental Assessment DOE's Golden Field Office has prepared this supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine, Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Final Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792: Draft Environmental Assessment EA-1792-S1: Finding of No Significant Impact

411

Draft General Conformity Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Draft General Conformity Determination U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix I Draft General Conformity Determination Draft General Conformity Determination Cape Wind Energy Project Prepared by Minerals Management Service Herndon, VA November 2008 i TABLE OF CONTENTS 1.0 INTRODUCTION TO THE PROPOSED ACTION............................................................... 1 2.0 GENERAL CONFORMITY REGULATORY BACKGROUND .......................................... 2 2.1 GENERAL CONFORMITY REQUIREMENTS.................................................................... 2 2.2 GENERAL CONFORMITY APPLICABILITY.....................................................................

412

Preliminary Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

413

Microsoft Word - 2012.01.24_RFHP_DRAFT_SEA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RENEWABLE FUEL HEAT PLANT IMPROVEMENTS RENEWABLE FUEL HEAT PLANT IMPROVEMENTS SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT NATIONAL RENEWABLE ENERGY LABORATORY SOUTH TABLE MOUNTAIN SITE GOLDEN, COLORADO February 3, 2012 U.S. Department of Energy Golden Field Office National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 DOE/EA-1573-S-I Draft Renewable Fuel Heat Plant Improvements Supplemental Environmental Assessment National Renewable Energy Laboratory South Table Mountain Site COVER SHEET Responsible Agency: Department of Energy Title: Draft Supplemental Environmental Assessment of the Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, Jefferson County, Colorado (DOE/EA-1573-S-I).

414

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Supplemental Tables to the Annual Energy Outlook 2005 Supplemental Tables to the Annual Energy Outlook 2005 EIA Glossary Supplemental Tables to the Annual Energy Outlook 2005 Release date: February 2005 Next release date: February 2006 The AEO Supplemental tables were generated for the reference case of the Annual Energy Outlook 2005 (AEO2005) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 2003 to 2025. Most of the tables were not published in the AEO2005, but contain regional and other more detailed projections underlying the AEO2005 projections. The files containing these tables are in spreadsheet format. A total of one hundred and seventeen tables is presented. The data for tables 10 and 20 match those published in AEO2005 Appendix tables A2 and A3, respectively. Forecasts for 2003-2005 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

415

DRAFT for Secretarial Review ENVIRONMENTAL ASSESSMENT/  

E-Print Network (OSTI)

DRAFT for Secretarial Review ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ INITIAL REGULATORY Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis (EA/RIR/IRFA) evaluates FLEXIBILITY ANALYSIS For an Amendment to the Fishery Management Plan (FMP) for Groundfish of the Bering Sea

416

Enforcement Guidance Supplement 99-03, Limitation of 10 CFR 830 to Equipment Referenced in the Safety Analysis Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Enforcement Department of Energy Washington DC 20585 October 20, 1999 MEMORANDUM FOR: DOE and Contractor PAAA Coordinators FROM: R. Keith Christopher Director Office of Enforcement and Investigation SUBJECT: Enforcement Guidance Supplement 99-03: Limitation of 10 CFR Part 830 to Equipment Referenced in the Safety Analysis Report Recently this Office received a reply to a Preliminary Notice of Violation (PNOV), although not denying any facts or conclusions in the PNOV and agreeing to pay the full imposed Civil Penalty, included arguments that some of the equipment cited in the

417

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

418

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation Federal loan guarantee solicitation announcement -- Advanced Nuclear Energy Projects. Draft Advanced...

419

(DOE/EIS-0285/SA-81): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 9,2002 July 9,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-81) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for fifteen Substations in The Dalles District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within The Dalles District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

420

(DOE/EIS-0285/SA-74): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/1/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for five Substations in the Malin District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In addition,

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

(DOE/EIS-0285/SA-82): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 13, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3,2002 3,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82 Jeffrey Hathhorn Redmond Deputy Regional Manager - TFI/IDAHO FALLS Proposed Action: Vegetation Management for twenty-four Substations in the Burley District. See list of facilities under planning step 1). Location: See list of facilities under Planning Step 1. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

422

(DOE/EIS-0285/SA-78): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for ten Substations in the Redmond District. (See list of facilities listed under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In

423

Supplement Analyses (SA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 10, 2004 August 10, 2004 EIS-0265-SA-169: Supplement Analysis Watershed Management Program August 10, 2004 EIS-0265-SA-168: Supplement Analysis Watershed Management Program August 9, 2004 EIS-0265-SA-167: Supplement Analysis Watershed Management Program August 6, 2004 EIS-0265-SA-166: Supplement Analysis Watershed Management Program August 4, 2004 EIS-0310-SA-01: Supplement Analysis Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States August 4, 2004 EIS-0265-SA-165: Supplement Analysis Watershed Management Program - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence August 4, 2004 EIS-0265-SA-163: Supplement Analysis Watershed Management Program August 2, 2004 EIS-0265-SA-164: Supplement Analysis

424

Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion  

NLE Websites -- All DOE Office Websites (Extended Search)

Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II Title Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II Publication Type Report LBNL Report Number LBNL-6193E Year of Publication 2013 Authors Rapp, Vi H., Albert Pastor-Perez, Brett C. Singer, and Craig P. Wray Date Published 04/2013 Abstract VENT-II is a computer program designed to provide detailed analysis of natural draft and induced draft combustion appliance vent-systems (i.e., furnace or water heater). This program is capable of predicting house depressurization thresholds that lead to backdrafting and spillage of combustion appliances; however, validation reports of the program being applied for this

425

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

426

EIS-0403: DOE and BLM Notice of Availability of the Draft Programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Programmatic Environmental Impact Statement EIS-0403: DOE and BLM Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The Bureau of Land Management (BLM) and the Department of Energy (DOE) (the Agencies) as co-lead agencies announced the availability of the Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern States (BLM/DES 10-59, DOE/EIS-0403). (75 FR 78980, December 17, 2010) EIS-0403-DOE_BLM_NOA-2010.pdf More Documents & Publications EIS-0403-S1: DOE and BLM Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

427

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

399: EPA Notice of Availability of the Draft Environmental 399: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

428

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

429

The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program  

E-Print Network (OSTI)

DRAFTING TECHNOLOGY The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program offers a choice of six areas of emphasis: architectural drafting; civil drafting; information technology; mechanical and electrical drafting; process

Ickert-Bond, Steffi

430

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...  

Office of Environmental Management (EM)

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation...

431

Supplement Analyses (SA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 2, 2003 October 2, 2003 EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis August 27, 2003 EIS-0246-SA-35: Supplement Analysis Wildlife Mitigation Program, seven miles east of Juntura, Oregon, Malheur County August 22, 2003 EIS-0246-SA-34: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana July 14, 2003 EIS-1069-SA-07: Supplement Analysis Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek Acclimation Site, Kittitas County, Washington May 21, 2003 EIS-0246-SA-33: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana May 20, 2003 EIS-0246-SA-32: Supplement Analysis Wildlife Mitigation Program

432

EIS-0319: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

319: Draft Environmental Impact Statement 319: Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated relocateing the TA-18 security Category I/II capabilities and materials to new locations: 1) different site at LANL (the preferred alternative) at Los Alamos, New Mexico; 2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; 3) the Nevada Test Site near Las Vegas; and 4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS analyzes upgrading of the TA-18 facilities at LANL. EIS-0319-DEIS-2001.pdf More Documents & Publications EIS-0319: Final Environmental Impact Statement EIS-0319: Record of Decision EIS-0236-S4: Final Supplemental Programmatic

433

DOE/EIS-0265-SA-169: Supplement Analysis for the Watershed Management Program EIS --Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing (08/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Mickey Carter Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 2.15 Acquisition of Sensitive Riparian Resources, 6.10 Access Fencing Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the installation of a fenced stream crossing over the Pahsimeroi River to enhance a livestock riparian exclosure.

434

E-Print Network 3.0 - assumptions draft study Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

results of all studies, reviews, consultations and coordination conducted regarding... completion of the Draft EIS, a preferred alternative is identified based on the analysis...

435

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format. Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format. MS Excel Viewer Spreadsheets are provided in excel Errata - August 25, 2004 1 to117 - Complete set of of Supplemental Tables PDF Table 1. Energy Consumption by Source and Sector (New England) XLS PDF Table 2. Energy Consumption by Source and Sector (Middle Atlantic) XLS PDF Table 3. Energy Consumption by Source and Sector (East North Central) XLS PDF Table 4. Energy Consumption by Source and Sector (West North Central) XLS PDF Table 5. Energy Consumption by Source and Sector (South Atlantic) XLS PDF Table 6. Energy Consumption by Source and Sector (East South Central) XLS PDF Table 7. Energy Consumption by Source and Sector (West South Central) XLS PDF Table 8. Energy Consumption by Source and Sector (Mountain)

436

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

5 5 Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format Excel logo Spreadsheets are provided in excel 1 to117 - Complete set of Supplemental Tables PDF Energy Consumption by Sector (Census Division) Table 1. New England XLS PDF Table 2. Middle Atlantic XLS PDF Table 3. East North Central XLS PDF Table 4. West North Central XLS PDF Table 5. South Atlantic XLS PDF Table 6. East South Central XLS PDF Table 7. West South Central XLS PDF Table 8. Mountain XLS PDF Table 9. Pacific XLS PDF Table 10. Total United States XLS PDF Energy Prices by Sector (Census Division) Table 11. New England XLS PDF Table 12. Middle Atlantic XLS PDF Table 13. East North Central XLS PDF Table 14. West North Central XLS PDF Table 15. South Atlantic XLS PDF Table 16. East South Central

437

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Annual Energy Outlook 1999 Annual Energy Outlook 1999 bullet1.gif (843 bytes) Assumptions to the AEO99 bullet1.gif (843 bytes) NEMS Conference bullet1.gif (843 bytes) Contacts bullet1.gif (843 bytes) To Forecasting Home Page bullet1.gif (843 bytes) EIA Homepage supplemental.gif (7420 bytes) (Errata as of 9/13/99) The AEO Supplementary tables were generated for the reference case of the Annual Energy Outlook 1999 (AEO99) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 1997 to 2020. Most of the tables were not published in the AEO99, but contain regional and other more detailed projections underlying the AEO99 projections. The files containing these tables are in spreadsheet format. A total of ninety-five tables are presented.

438

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

December 22, 2000 (Next Release: December, 2001) Related Links Annual Energy Outlook 2001 Assumptions to the AEO2001 NEMS Conference Contacts Forecast Homepage EIA Homepage AEO Supplement Reference Case Forecast (1999-2020) (HTML) Table 1. Energy Consumption by Source and Sector (New England) Table 2. Energy Consumption by Source and Sector (Middle Atlantic) Table 3. Energy Consumption by Source and Sector (East North Central) Table 4. Energy Consumption by Source and Sector (West North Central) Table 5. Energy Consumption by Source and Sector (South Atlantic) Table 6. Energy Consumption by Source and Sector (East South Central) Table 7. Energy Consumption by Source and Sector (West South Central) Table 8. Energy Consumption by Source and Sector (Mountain)

439

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Homepage Homepage Supplement Tables to the AEO2001 The AEO Supplementary tables were generated for the reference case of the Annual Energy Outlook 2001 (AEO2001) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 1999 to 2020. Most of the tables were not published in the AEO2001, but contain regional and other more detailed projections underlying the AEO2001 projections. The files containing these tables are in spreadsheet format. A total of ninety-five tables is presented. The data for tables 10 and 20 match those published in AEO2001 Appendix tables A2 and A3, respectively. Forecasts for 1999 and 2000 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

440

Secretarial Review Draft Regulatory Impact Review/Environmental Assessment/  

E-Print Network (OSTI)

Secretarial Review Draft Regulatory Impact Review/Environmental Assessment/ Initial Regulatory............................................................................................................................. 1 2.0 REGULATORY IMPACT REVIEW Flexibility Analysis for Proposed Amendment 92 to the Fishery Management Plan for Groundfish of the Bering Sea

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

(DOE/EIS-0285/SA-04): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/27/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 27, 2001 March 27, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-04) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Ponderosa - Pilot Butte 18/2 to 18/4 Relocation Location: The project area is in the City of Bend, OR, in Deschutes County. Proposed by: Bonneville Power Administration Description of the Proposed Action: BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa - Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. Analysis: 1. Description of right-of-way and vegetation management needed: The project involves

442

(DOE/EIS-0285/SA-75): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (06/21/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June June 21, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington. Jim Jellison -- - TFO/Olympia Ed Tompkins -- - TFO/Ross Proposed Action: Vegetation Management for the Ross Lexington Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and

443

(DOE/EIS-0285/SA-103): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 12, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-103-Keeler-Pennwalt). Jim Jellison - TFO/Olympia Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for the Keeler-Pennwalt transmission line and parts of the St. John-Keeler, Rivergate-Keeler, Keeler-Oregon City, & St. John-St. Helens lines. Location: Washington and Multnomah Counties, Oregon Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: See the attached checklist for the

444

(DOE/EIS-0183-SA-05): Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, 10/17/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 17, 2002 October 17, 2002 REPLY TO ATTN OF: KECP-4 SUBJECT: Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, DOE/EIS-0183-SA-05 memorandum Mark A. Jones Program Analyst - PGF-6 TO : Proposed Action: Boise River Diversion Dam - Amendment to Capital Investment Sub-Agreement, Contract Number DE-MS79-94BP94618 Proposed By: Bonneville Power Administration (BPA) and Bureau of Reclamation (Reclamation) Location: Near Boise, in Ada County, Idaho Description of the Proposed Action: BPA proposes to fund Reclamation's rehabilitation of the powerplant at the existing Boise River Diversion Dam (Diversion Dam) to use the water resource at Diversion Dam for electrical power production. Analysis: The Diversion Dam is located about 7 miles southeast of Boise, Idaho on the Boise River, about

445

(DOE/EIS-0285/SA-08): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/23/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2001 23, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08 Don Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Clearing C-trees along the south side of the right-of-way. Location: Raver - Covington Line 1, between towers 6/5 and 7/2. Work will be performed in the State of Washington. Proposed by: BPA Snohomish Region. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Planning Steps 1. Identify facility and the vegetation management need. The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All

446

EA-1906: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

447

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

448

DOE/EIS-0222-SA-O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22-SA-O1 22-SA-O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement U.S. Department of Energy Richland Operations Office Richland, Washington 99352 June 2008 DOE/EIS-0222-SA-0 1 SUMMARY In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least the next 50-year planning period and lasting for as long as DOE retains legal control of some portion of the real estate. In November 1999 DOE issued its Record of Decision (ROD), establishing the Comprehensive Land-Use Plan (CLUP), which consisted of four key elements:

449

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

450

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

451

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

452

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

453

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/13/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4/13/01 4/13/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation. Location: The pastureland is adjacent to the Walla Walla Substation and is located east and north of the fenced substation, all within the BPA property boundary. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also

454

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

455

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

456

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-30)(10/28/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) 0) Allyn Meuleman TO: Fish and Wildlife Project Manager Proposed Action: Horkley Property Fee Simple Acquisition Project No: 1995-057-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Jefferson County, Idaho Proposed by: Bonneville Power Administration (BPA), the U.S. Bureau of Land Management (BLM), and Idaho Department of Fish and Game (IDFG). Description of the Proposed Action: BPA proposes to fund the acquisition of approximately 120 acres of sagebrush steppe and agricultural lands in Jefferson County, Idaho. The property proposed for acquisition lies on the west slope of the Menan Butte Area of Critical

457

(DOE/EIS-0265/SA-92): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Asotin Creek Six-Year Direct Seed Program Project No: 1999-060-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Copping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use. Location: Various locations in the Asotin Creek Watershed, WA. Proposed by: Bonneville Power Administration (BPA) and Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a no-till/direct seed farming

458

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-31)(10/28/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1) 1) Allyn Meuleman TO: Fish and Wildlife Project Manager Proposed Action: Allen Property Fee Simple Acquisition Project No: 1995-057-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Jefferson County, Idaho Proposed by: Bonneville Power Administration (BPA), the U.S. Bureau of Land Management (BLM), and Idaho Department of Fish and Game (IDFG). Description of the Proposed Action: BPA proposes to fund the acquisition of approximately 81 acres of forested wetlands and scrub shrub wetlands along the south bank of the South Fork of the Snake River in Jefferson County, Idaho. The property proposed for acquisition lies within

459

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

460

Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DISCLAIMER DISCLAIMER This document has been approved for distribution to the public. All information classified by the Department of Energy Strategic Petroleum Reserve as Sensitive Unclassified Information has been removed from this document. DOE/SPR/EIS-0075-SA01 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENTS: OPERATIONAL AND ENGINEERING MODIFICATIONS, REGULATORY REVIEW, AND SOCIOECONOMIC VARIATION U.S. Department of Energy Strategic Petroleum Reserve 900 Commerce Road East New Orleans, Louisiana 70123 March 2004 Prepared for the U. S. Department of Energy Strategic Petroleum Reserve Project Management Office under Contract No. DE-AC96-93PO92207 DynMcDermott Petroleum Operations Company 850 South Clearview Parkway

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

462

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

463

Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05) 9/20/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 20, 2002 September 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the domestication selection research task would be modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration is funding ongoing studies, research, and artificial production of

464

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

465

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

466

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

467

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

468

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

469

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

470

Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 7, 2004 April 7, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the coho acclimation research task would be modified to include a new site located in the upper Yakima south of Cle Elum, WA. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Yakima Fisheries Project Final Environmental Impact Statement (YFP EIS)

471

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

472

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

473

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

474

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

475

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

476

(DOE/EIS-0285/SA-56): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09, 2002 09, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56) 2ULRQ $OEUR 2O\PSLD 5HJLRQDO 0DQDJHU Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical

477

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

478

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) 5/31/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2002 31, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of the facility. Location: The Lines Creek Microwave site is located at SWSW Section 33 T44N R2E within Shoshone County, Idaho, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes bare ground vegetation management at the microwave site. Bare ground management is needed to prevent fire damage and maintain a vegetation free environment on the site.

479

(DOE/EIS-0265/SA-03): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Couse/Tenmile Creeks Six-Year Direct Seed Program Project No: 2002-050-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Cropping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in Rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use Location: Various properties in Anatone, Asotin County, Washington Proposed by: Bonneville Power Administration (BPA) and The Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a six-year direct seed program

480

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

Note: This page contains sample records for the topic "draft supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

(DOE/EIS-0265/SA-95): Supplement Analysis for the Watershed Management Program EIS 10/21/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2002 21, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-95) Ron Morinaka (KEWU - 4) TO: Fish and Wildlife Project Manager, COTR Proposed Action: Libby Creek Channel Stabilization Project Project No: 199500400 Watershed Management Program (See App. A : Available Management Techniques): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.9 Structural Bank Protection using Bioengineering Methods; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities. Location: On Libby Creek, located about 18 miles southwest of the town of Libby, Montana

482

(DOE/EIS-0285/SA-64): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/26/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2002 6, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-64) Truman Conn - TFP Regional Manager, Walla Walla Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region (See Attachment A for a complete list of facilities) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all gra