1

DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT NEPA Guidance on Consideration of the Effects of Climate DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions The Council on Environmental Quality (CEQ) issued this draft guidance memorandum for public consideration and comment on the ways in which Federal agencies can improve their consideration of the effects of greenhouse gas (GHG) emissions and climate change in their evaluation of proposals for Federal actions under NEPA. This draft guidance was intended to help explain how agencies of the Federal government should analyze the environmental effects of GHG emissions and climate change when they describe the environmental effects of a proposed agency action in accordance with Section 102 of NEPA and the CEQ Regulations for

2

CEQ Issues Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ) issued revised draft guidance on consideration of greenhouse gas (GHG) emissions and the effects of climate change in National Environmental Policy Act (NEPA) reviews on December 18, 2014

3

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews  

Energy.gov (U.S. Department of Energy (DOE))

On December 18, 2014, CEQ released revised draft guidance for public comment that describes how Federal departments and agencies should consider the effects of greenhouse gas emissions and climate change in their National Environmental Policy Act reviews. The revised draft guidance supersedes the draft greenhouse gas and climate change guidance released by CEQ in February 2010.

4

NEPA Contracting Reform Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring NEPA process costs < NEPA contractor evaluation procedures < details on the DOE NEPA Web site U.S. Department of Energy, Office of NEPA Policy and Assistance, December 1996 NEPA CONTRACTING REFORM GUIDANCE Table of Contents 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and...

6

CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...  

Office of Environmental Management (EM)

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of...

7

GUIDANCE REGARDING NEPA REGULATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This memorandum was published in the Federal Register and appears at 48 Fed. Reg. 34263 (1983). Ed. Note] This memorandum was published in the Federal Register and appears at 48 Fed. Reg. 34263 (1983). Ed. Note] GUIDANCE REGARDING NEPA REGULATIONS 40 CFR Part 1500 Executive Office of the President Council on Environmental Quality 722 Jackson Place, N.W. Washington, D.C. 20006 July 22, 1983 Memorandum For: Heads of Federal Agencies From: A. Alan Hill, Chairman Re: Guidance Regarding NEPA Regulations The Council on Environmental Quality (CEQ) regulations implementing the National Environmental Policy Act (NEPA) were issued on November 29, 1978. These regulations became effective for, and binding upon, most federal agencies on July 30, 1979, and for all remaining federal agencies on November 30, 1979. As part of the Council's NEPA oversight responsibilities it solicited through an August 14,

8

NEPA Contracting Reform Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracting Reform Guidance Contracting Reform Guidance NEPA Contracting Reform Guidance This documents provides guidance on NEPA contracting strategy, including: defining the work of the contractor; establishing contracts ahead of time; minimizing cost while maintaining quality. Guidance also provides: model statements of work, direction on NEPA contract management by NEPA Document Manager; a system for measuring NEPA costs and for evaluating contractor procedures; details on the DOE NEPA website. NEPA Contracting Reform Guidance More Documents & Publications NEPA Contracting Reform Guidance (December 1996) Statement of Work-National Environmental Policy Act (NEPA) Support Services Acquisition: Preparation and Review of Environmental Impact Statements, Environmental Assessments, Environmental Reports, and other Environmental

9

All NEPA Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements » Guidance » All NEPA Guidance Guidance & Requirements » Guidance » All NEPA Guidance All NEPA Guidance Council on Environmental Quality Guidance Final Guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act (2012) Appropriate Use of Mitigation and Monitoring and Clarifying the Appropriate Use of Mitigated Findings of No Significant Impact (2011) Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions under NEPA (2010) Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA (2010) A Citizen's Guide to the NEPA: Having Your Voice Heard (2007) Guidance on the Consideration of Past Actions in Cumulative Effects Analysis (2005) Memorandum for Federal NEPA Contacts: Emergency Actions and

10

NEPA Contracting Reform Guidance (December 1996)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

defining early what contractors should accomplish defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring NEPA process costs < NEPA contractor evaluation procedures < details on the DOE NEPA Web site U.S. Department of Energy, Office of NEPA Policy and Assistance, December 1996 NEPA CONTRACTING REFORM GUIDANCE Table of Contents 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . .

11

General Guidance on NEPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Guidance on NEPA General Guidance on NEPA General Guidance on NEPA Selected documents providing General Guidance on NEPA. March 1, 2011 DOE, NEPA, and YOU A pamphlet providing information on public participation and NEPA. December 1, 2007 A Citizen's Guide to the NEPA: Having Your Voice Heard This guide is based on research and consultations undertaken by the Council on Environmental Quality concerning the need for a Citizen's Guide to the National Environmental Policy Act (NEPA). Participants in NEPA Regional Roundtables held in 2003-2004 clearly voiced the need for an guide that provides an explanation of NEPA, how it is implemented, and how people outside the Federal government - individual citizens, private sector applicants, members of organized groups, or representatives of Tribal,

12

Other NEPA Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other NEPA Guidance Other NEPA Guidance Other NEPA Guidance Selected documents prepared by a variety of agencies that provide guidance on the NEPA process. December 31, 2009 Presidential Proclamation on the 40th Anniversary of the National Environmental Policy Act Proclamation of President Obama to "call upon all executive branch agencies to promote public involvement and transparency in their implementation of the National Environmental Policy Act." July 1, 1998 Managing NEPA at the Department of Energy A report, by the National Academy of Public Administration, on the management of NEPA within the Department of Energy. January 23, 1995 The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental

13

DOE NEPA Guidance and Requirements - Search Index - Table of Contents |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE NEPA Guidance and Requirements - Search Index - Table of DOE NEPA Guidance and Requirements - Search Index - Table of Contents DOE NEPA Guidance and Requirements - Search Index - Table of Contents Return to Download Page The DOE NEPA Guidance and Requirements - Search Index includes: NEPA Guidance and Requirements Documents Issued by Published A Brief Guide - DOE-wide Contracts For NEPA Documentation DOE 2003 A Citizen's Guide to the NEPA - Having Your Voice Heard CEQ 2007 A Resource Handbook on DOE Transportation Risk Assessment DOE 2002 Actions During the NEPA Process - Interim Actions DOE 2003 Administrative Record Guidance DOJ 1991 Aligning the NEPA Process with EMS CEQ 2007 Alternative Actions For Analysis in Site-wide NEPA Reviews DOE 1992 Amended Environmental Impact Statement Filing System Guidance EPA 2012 Analysis of Impacts on Prime and Unique Agricultural Lands and NEPA

14

Using the NEPA Requirements and Guidance - Search Index  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the NEPA Requirements and Guidance - Search Index the NEPA Requirements and Guidance - Search Index Step 2: Entering a Search Term or Phrase 1. Locate the downloaded file, right click on it, select "Extract all", extract it to any location on your computer or USB drive. 2. Locate and Open the extracted folder "NEPA Requirements and Guidance - Search Index". 3. Locate and Open the .PDX file titled "Search - NEPA Requirements and Guidance" to open search form.

15

DOE NEPA Guidance and Requirements - Search Index - Table of Contents |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Table of Table of Contents DOE NEPA Guidance and Requirements - Search Index - Table of Contents Return to Download Page The DOE NEPA Guidance and Requirements - Search Index includes: NEPA Guidance and Requirements Documents Issued by Published A Brief Guide - DOE-wide Contracts For NEPA Documentation DOE 2003 A Citizen's Guide to the NEPA - Having Your Voice Heard CEQ 2007 A Resource Handbook on DOE Transportation Risk Assessment DOE 2002 Actions During the NEPA Process - Interim Actions DOE 2003 Administrative Record Guidance DOJ 1991 Aligning the NEPA Process with EMS CEQ 2007 Alternative Actions For Analysis in Site-wide NEPA Reviews DOE 1992 Amended Environmental Impact Statement Filing System Guidance EPA 2012 Analysis of Impacts on Prime and Unique Agricultural Lands and NEPA

16

Final Guidance for Effective Use of Programmatic NEPA Review  

Energy.gov (U.S. Department of Energy (DOE))

On December 18, 2014, CEQ published final guidance that provides clarification on when and how Federal agencies can use programmatic NEPA reviews in accordance with the National Environmental Policy Act (NEPA) and the CEQ NEPA Regulations. Guidance on programmatic NEPA reviews has been requested by the agencies and attention on programmatic NEPA reviews has increased as agencies are increasingly undertaking broad landscape scale analyses for proposals that affect the resources they manage.

17

CEQ Issues Guidance on Improving NEPA Process Efficiency | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency March 12, 2012 - 3:26pm Addthis The Council on Environmental Quality (CEQ) has issued new guidance titled "Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act" (NEPA Efficiency Guidance) that encourages federal agencies to "provide the best use of agency resources in ensuring a timely, effective, and efficient NEPA review." The NEPA Efficiency Guidance highlights existing provisions under the CEQ regulations implementing NEPA (40 CFR Parts 1500-1508) that help meet this objective. These provisions are available for the preparation of EAs, as well as EISs, and the Guidance encourages their use

18

CEQ Issues Guidance on Improving NEPA Process Efficiency | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency CEQ Issues Guidance on Improving NEPA Process Efficiency March 12, 2012 - 3:26pm Addthis The Council on Environmental Quality (CEQ) has issued new guidance titled "Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act" (NEPA Efficiency Guidance) that encourages federal agencies to "provide the best use of agency resources in ensuring a timely, effective, and efficient NEPA review." The NEPA Efficiency Guidance highlights existing provisions under the CEQ regulations implementing NEPA (40 CFR Parts 1500-1508) that help meet this objective. These provisions are available for the preparation of EAs, as well as EISs, and the Guidance encourages their use

19

DOE NEPA Guidance and Requirements - Search Index - List of Contents |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

List of List of Contents DOE NEPA Guidance and Requirements - Search Index - List of Contents Return to Download Page The NEPA Guidance and Requirements - Search Index includes: A Brief Guide - DOE-wide Contracts For NEPA Documentation [DOE][2003] A Citizen's Guide to the NEPA - Having Your Voice Heard [CEQ][2007] A Resource Handbook on DOE Transportation Risk Assessment [DOE][2002] Actions During the NEPA Process - Interim Actions [DOE][2003] Administrative Record Guidance [DOJ][1991] Aligning the NEPA Process with EMS [CEQ][2007] Alternative Actions For Analysis in Site-wide NEPA Reviews [DOE][1992] Amended Environmental Impact Statement Filing System Guidance [EPA][2012] Analysis of Impacts on Prime and Unique Agricultural Lands and NEPA [CEQ][1980] Analysis of Impacts to Workers in NEPA Documentation [DOE][1988]

20

Guidance on NEPA Review for Corrective Actions under the Resource  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on NEPA Review for Corrective Actions under the Resource Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

NEPA Contracting Reform Guidance (December 1996) | Department...  

Office of Environmental Management (EM)

NEPA process costs, NEPA contractor evaluation procedures, and details on the DOE NEPA Web site. The statement of work here is superseded by that of the DOE-wide Contracts. NEPA...

22

Guidance Regarding Actions That May Proceed During the NEPA Process:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions That May Proceed During the NEPA Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions More Documents & Publications NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to

23

DOE NEPA Guidance and Requirements - Search Index | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index The DOE NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use. The compressed (.zip) file contains all of these documents in their optimized and machine-readable format. The file also contains a "search index" that can be used to search for keywords and phrases in all the documents from one search form, without the need to install a separate program. Please direct any questions, comments, or feedback to: John.Jediny@hq.doe.gov Review the documents included in the Search Index as a List or Table NEPA Requirements and Guidance - Search Index.zip

24

DOE NEPA Guidance and Requirements - Search Index | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index DOE NEPA Guidance and Requirements - Search Index The DOE NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use. The compressed (.zip) file contains all of these documents in their optimized and machine-readable format. The file also contains a "search index" that can be used to search for keywords and phrases in all the documents from one search form, without the need to install a separate program. Please direct any questions, comments, or feedback to: John.Jediny@hq.doe.gov Review the documents included in the Search Index as a List or Table NEPA Requirements and Guidance - Search Index.zip

25

Guidance on NEPA Review for Corrective Actions under the Resource  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Review for Corrective Actions under the Resource NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

26

Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping This Council on Environmental Quality scoping guidance document consists of advice on what works and what does not, based on the experience of many agencies and other participants in scoping. It is intended to make generally available the results of the Council's research, and to encourage the use of better techniques for ensuring public participation and efficiency in the scoping process. CEQ_Scoping_Guidance.pdf More Documents & Publications Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping A Citizen's Guide to the NEPA: Having Your Voice Heard

27

NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ), incollaboration with the California Governors Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

28

Guidance Regarding NEPA Regulations | Department of Energy  

Energy Savers (EERE)

guidance on several topics: scoping, categorical exclusions, adoption procedures, contracting provisions, selection of alternatives in licensing and permitting situations, and...

29

Energy Department Seeks Feedback on Draft Guidance for the Hydroelectr...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program...

30

Energy Department Seeks Additional Feedback on Draft Guidance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Additional Feedback on Draft Guidance for the Hydroelectric...

31

National Environmental Policy Act (NEPA) Compliance Guide Volume 2 - Department of Energy NEPA Regulations and Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

memorandum memorandum u DATE: REPLY TO AllN OP: SUSJECT TO. August 16, 1994 Office ofNEPA Oversight: EH-25:Lichtman:500-401 O Environmental Assessment Checklkt Secretarial Officers and Heads of Field Offices This memorandum transmits a new Department of Energy (DOE) Environmental Assessment Checklist, prepared by the OMCS of Environment, Safety and Health to assist DOE components in cartying outtheir responsibilities undertheNational Environmental Policy Act (NEPA). A draft of this checklist was distributed for review and comment at the NEPA Compliance Officers meeting in February 1994. Although there is no requirement to use this checklist, we belleve it is a useful tool in the preparation and review of DOE environmental assessments.Nevertheless, a checklist approach has certain inherent limitations, as discussed on page 1. Some NEPA practitioners may find this checklist has

32

Special Topics in NEPA Documentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Topics in NEPA Documentation Special Topics in NEPA Documentation Special Topics in NEPA Documentation Selected documents covering Special Topics under NEPA. February 18, 2010 DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions The Council on Environmental Quality (CEQ) issued this draft guidance memorandum for public consideration and comment on the ways in which Federal agencies can improve their consideration of the effects of greenhouse gas (GHG) emissions and climate change in their evaluation of proposals for Federal actions under NEPA. July 10, 2002 Recommendations for Analyzing Accidents Under NEPA This DOE guidance clarifies and supplements "Recommendations for the Preparation of Environmental Assessments and Environmental Impact

33

Draft Policy and Planning Guidance for Community Transition Activities...  

Office of Environmental Management (EM)

Work Force Restructuring Office of Worker and Community Transition Draft Policy and Planning Guidance for Community Transition Activities More Documents & Publications...

34

CEQ Guidance on the Application of NEPA to Proposed Federal Actions...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

not. CEQTransboundaryGuidance070197.pdf More Documents & Publications NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems Purpose and Need: CEQ Exchange of...

35

Guidance | Department of Energy  

Energy Savers (EERE)

Guidance Guidance NEPA Guidance by Agency Council on Environmental Quality Department of Energy Environmental Protection Agency Other NEPA Guidance and Reports NEPA Guidance by...

36

DOE NEPA Guidance on EIS Distribution (06/15/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS EIS DISTRIBUTION June 2006 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance printed on recycled paper EIS DISTRIBUTION U.S. Department of Energy Environment, Safety and Health Offi ce of NEPA Policy and Compliance June 2006 Offi ce of Environment, Safety and Health Helping the fi eld succeed with safe and reliable operations. EIS Distribution Contents 1. Introduction................................................................................................................................1

37

Draft For-Profit Audit Guidance (FY 2011) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft For-Profit Audit Guidance (FY 2011) Draft For-Profit Audit Guidance (FY 2011) For-ProfitAuditGuidance(Part I)Federal Register0.docx For-ProfitAuditGeneralComplianceS...

38

NEPA and Other Laws | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

NEPA and Other Laws NEPA and Other Laws NEPA and Other Laws Selected documents providing guidance on the relationship between NEPA and other laws. March 5, 2013 NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft) The Council on Environmental Quality (CEQ), in collaboration with the California Governor's Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and California Environmental Quality Act (CEQA) review processes. The guide provides practitioners with an overview of NEPA and CEQA as well as valuable suggestions for developing a single environmental review process that can meet the requirements of both statutes. March 5, 2013 NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 In this document the Council on Environmental Quality and the Advisory

39

Draft Guidance for Section 242 of the Energy Policy Act of 2005...  

Energy Savers (EERE)

Draft Guidance for Section 242 of the Energy Policy Act of 2005 - Hydroelectric Production Incentive Program - July 2014 Draft Guidance for Section 242 of the Energy Policy Act of...

40

DRAFT NEPA Guidance on Consideration of the Effects of Climate...  

Office of Environmental Management (EM)

which Federal agencies can improve their consideration of the effects of greenhouse gas (GHG) emissions and climate change in their evaluation of proposals for Federal actions...

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learned September 2009 1 Learned September 2009 1 Third Quarter FY 2009 September 1, 2009; Issue No. 60 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A DOE General Counsel Scott Blake Harris Aims To Improve the NEPA Review Process In his first month on the job, DOE's new General Counsel, Scott Blake Harris, issued operating principles for NEPA document review by the Office of General Counsel (GC) to reduce the time required for such reviews and avoid multiple rounds of comments, particularly for

42

MHK LCOE Reporting Guidance Draft | OpenEI Community  

Open Energy Info (EERE)

MHK LCOE Reporting Guidance Draft MHK LCOE Reporting Guidance Draft Home > Groups > Water Power Forum Ocop's picture Submitted by Ocop(5) Member 18 April, 2013 - 13:41 Cost Current DOE LCOE numerical modeling Performance Tidal Wave To normalize competing claims of LCOE, DOE has developed-for its own use-a standardized cost and performance data reporting process to facilitate uniform calculation of LCOE from MHK device developers. This standardization framework is only the first version in what is anticipated to be an iterative process that involves industry and the broader DOE stakeholder community. Multiple files are attached here for review and comment. The primary files for review are the: "DOE LCOE Reporting Guidance" Word document an Excel workbook containing the reference resource data for Wave

43

Environmental Quality Improvement Act of 1970; Department of Energy NEPA Regulations & Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F F 1325.B (8-89) EFG (07-90) United States Government Department of Energy memorandum DATE: May O8, 1995 REPLY TO ATTN OF: Office of NEPA Policy and Assistance:Borgstrom:6-4600 SUBJECT: Guidance for Si te-wide Environmental Impact Statements TO: Henry Garson, NEPA Compliance Officer Office of Defense Programs You have raised a concern that several programmatic and site-wide environmental impact statements (EISs) related to the nuclear weapons complex involve potential overlaps in scope. If not addressed appropriately, such overlaps could result in unnecessary cost, delay, and stakeholder concern regarding the Department's decision making process. In addition, given the interrelationships among proposed actions and alternatives in the programmatic and site-wide EISs, it is not clear how to cover

44

Office of NEPA Policy and Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of NEPA Policy and Compliance Office of NEPA Policy and Compliance NEPA Requirements and Guidance - Search Index Quickly search through 100+ NEPA requirements and guidance documents to find information on NEPA topics. Read more DOE NEPA Projects Currently Open for Public Comment Find how to comment on DOE NEPA documents in an area of interest. Read more NEPA Success Stories from Lessons Learned Quarterly Reports This compilation describes DOE NEPA reviews that resulted in better planning, enhanced public participation, and protection of sensitive environmental resources. Read more Latest Documents & Notices January 17, 2014 EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana January 15, 2014 EIS-0460: Record of Decision

45

Office of NEPA Policy and Compliance | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of NEPA Policy and Compliance Office of NEPA Policy and Compliance NEPA Requirements and Guidance - Search Index Quickly search through 100+ NEPA requirements and guidance documents to find information on NEPA topics. Read more DOE NEPA Projects Currently Open for Public Comment Find how to comment on DOE NEPA documents in an area of interest. Read more NEPA Success Stories from Lessons Learned Quarterly Reports This compilation describes DOE NEPA reviews that resulted in better planning, enhanced public participation, and protection of sensitive environmental resources. Read more Latest Documents & Notices January 10, 2014 EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana January 10, 2014

46

Alternative Fuels Data Center: U.S. EPA Proposes Draft Guidance on E85  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Proposes Proposes Draft Guidance on E85 Flexible Fuel Vehicle Weighting Factor for GHG Emissions to someone by E-mail Share Alternative Fuels Data Center: U.S. EPA Proposes Draft Guidance on E85 Flexible Fuel Vehicle Weighting Factor for GHG Emissions on Facebook Tweet about Alternative Fuels Data Center: U.S. EPA Proposes Draft Guidance on E85 Flexible Fuel Vehicle Weighting Factor for GHG Emissions on Twitter Bookmark Alternative Fuels Data Center: U.S. EPA Proposes Draft Guidance on E85 Flexible Fuel Vehicle Weighting Factor for GHG Emissions on Google Bookmark Alternative Fuels Data Center: U.S. EPA Proposes Draft Guidance on E85 Flexible Fuel Vehicle Weighting Factor for GHG Emissions on Delicious Rank Alternative Fuels Data Center: U.S. EPA Proposes Draft Guidance

47

CEQ 's Response to a Petition for Rulemaking and Issuance of Guidance to Require Inclusion of Climate Change Analyses in NEPA Documents  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ) denied a petition requesting that CEQ (1) amend its NEPA regulations to require Federal agencies to address greenhouse gases (GHGs) and climate change effects in their NEPA documents, and (2) issue guidance on agencies should address GHGs and climate change under NEPA.

48

Energy Sector Cybersecurity Framework Implementation Guidance- Draft for Public Comment & Comment Submission Form (September 2014)  

Energy.gov (U.S. Department of Energy (DOE))

On September 12, 2014, the Department issued a Federal Register Notice announcing the availability of the Energy Sector Cybersecurity Framework Implementation Guidance for public comment. The draft Energy Sector Cybersecurity Framework Implementation Guidance and comment submission form are available.

49

Draft Guidance for Section 242 of the Energy Policy Act of 2005- Hydroelectric Production Incentive Program- July 2014  

Energy.gov (U.S. Department of Energy (DOE))

This document contains draft guidance for Section 242 of the Energy Policy Act of 2005, the "Hydroelectric Production Incentive Program"

50

Draft Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance 9Dec2010 Guidance 9Dec2010 i DRAFT Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures in Covered Facilities (per 42 U.S.C. 8253 Subsection (f), Use of Energy and Water Efficiency Measures in Federal Buildings) December 9, 2010 I. PURPOSE ............................................................................................................................................ 1 II. BACKGROUND ................................................................................................................................. 1 A. Authority ................................................................................................................................. 1 B. Related DOE Guidance and Activity ...................................................................................... 1

51

Consideration of Cumulative Impacts in EPA Review of NEPA Documents, EPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consideration of Cumulative Impacts in EPA Review of NEPA Consideration of Cumulative Impacts in EPA Review of NEPA Documents, EPA Office of Federal Activities Consideration of Cumulative Impacts in EPA Review of NEPA Documents, EPA Office of Federal Activities The purpose of this guidance is to assist EPA reviewers of NEPA documents in providing accurate, realistic, and consistent comments on the assessment of cumulative impacts. The guidance focuses on specific issues that are critical in EPA's review of NEPA documents under Section 309 of the Clean Air Act. G-EPA-cumulative_impacts.pdf More Documents & Publications Consideration Of Cumulative Impacts In EPA Review of NEPA Documents Considering Cumulative Effects Under the National Environmental Policy Act DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and

52

CEQ Issues Final Guidance for Effective Use of Programmatic NEPA Reviews  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ) issued final guidance for effective use of programmatic National Environmental Policy Act reviews on December 18, 2014.

53

NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems In this article, the former General Counsel of the Council on Environmental Quality, outlines NEPA's purposes, scope, and implementation procedures. She describes current issues in NEPA practice and policy, and observes that NEPA has continuing vitality in the context of a new generation of environmental concerns. NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems More Documents & Publications A Citizen's Guide to the NEPA: Having Your Voice Heard DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions Cooperating Agencies in Implementing the Procedural Requirements of the

54

Managing NEPA at the Department of Energy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy. G-Oth-ManagingNEPADOE.pdf More Documents & Publications NEPA Contracting Reform Guidance NEPA Contracting Reform Guidance (December 1996) Lessons Learned Quarterly...

55

Microsoft Word - DRAFT CRB Interview Guidance.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certification Review Board Interview Guidance Certification Review Board Interview Guidance 1 Background and Scope: The Certification Review Board (CRB) conducts interviews for Level 3 and 4 certification candidates, unless otherwise waived by the CRB (see Appendix C of the March, 2009 PMCDP Certification and Equivalency Guidelines ). These interviews allow aspiring Level 3 and 4 federal project directors to demonstrate verbally their mastery of the requisite leadership expertise, to include the expert management of project resources and accountability for project successes and failures, needed to manage high-dollar, mission-critical DOE projects effectively. Interview Structure and Process: Candidate interviews are conducted after the certification candidate's profile has been provisionally

56

Guidance on National Environment Policy Act Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Government Department of Energy Government Department of Energy memorandum DATE: January 16, 1998 REPLY TO ATTN OF: Office of NEPA Policy and Assistance: Osborne: 202-586-4596 SUBJECT: Guidance on National Environmental Policy Act (NEPA) Categorical Exclusion Determinations TO: Secretarial Officers and Heads of Field Organizations This memorandum provides a reminder of the requirements for applying categorical exclusions pursuant to the Department of Energy's (DOE's) NEPA regulations and guidance for simple recordkeeping of such determinations. Recent litigation has prompted our review of DOE's procedures for making these determinations. The draft version of this guidance was discussed at the June 1997 NEPA Community Meeting. Issues raised then that are not addressed here concern the

57

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

58

GC NEPA Listserv | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Center » Sign Up for GC Updates » GC NEPA Listserv Action Center » Sign Up for GC Updates » GC NEPA Listserv GC NEPA Listserv Subscribe to NEPA Updates The Office of NEPA Policy and Compliance maintains two Listserv lists to provide a central notification system for (1) DOE NEPA news, including announcements, notices, and related documents posted on this website, and (2) draft Environmental Assessments. Please use the following instructions to subscribe to both or either of these updates. * NEPA-Updates Listserv: Receive email notification of NEPA News updates in your email inbox, by sending an email to Listserv@listserv.doe.gov with "Subscribe NEPA-Updates" followed by your FIRST NAME and LAST NAME, in the body of the email (i.e., Subscribe NEPA-Updates John Doe). Do not include your signature block or any other data in the body of the

59

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

60

Guidance  

Energy.gov (U.S. Department of Energy (DOE))

This site provides a centralized topical resource for enforceable DOE and federal health, safety and security requirements and related guidance documents. DOEs guidance documents support understanding, ensure technical and management capabilities and collaborative improvement efforts.

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Energy Sector Cybersecurity Framework Implementation Guidance  

Energy Savers (EERE)

DRAFT FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of...

62

NEPA and CEQA: Integrating State and Federal Environmental Reviews...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Governor's Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and California Environmental Quality Act (CEQA) review processes....

63

Selected Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

64

Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

65

EPA - Guidance for Incorporating Environmental Justice Concerns...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: EPA - Guidance for Incorporating Environmental Justice Concerns in EPA's NEPA...

66

EIS-0376: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

67

EIS-0279: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

9: Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

68

EIS-0306: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

69

EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...  

Office of Environmental Management (EM)

Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

70

EIS-0271: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

71

EIS-0082-S2: Draft Environmental Impact Statement | Department...  

Energy Savers (EERE)

S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

72

Draft Energy Sector Cybersecurity Framework Implementation Guidance Available for Public Comment  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) has issued a Notice of Public Comment in the Federal Register, inviting the public to comment on DOE's Energy Sector Cybersecurity Framework Implementation Guidance. The document is available for a 30 day comment period.

73

Energy Department Seeks Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy is currently inviting comments from the general public on revised guidance relating to the implementation of Section 242 of the Energy Policy Act of 2005, the Hydroelectric Production Incentive Program.

74

Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy is currently inviting comments from the general public on guidance relating to the implementation of Section 242 of the Energy Policy Act of 2005, the Hydroelectric Production Incentive Program.

75

UGP Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, UGP prepares environmental impact statements. Environmental Impact Statement-EIS Groton Generation Projects Draft EIS, Deer Creek Station Energy Facility Project, Brookings County, South Dakota (12.7mb pdf) Deer Creek Station Energy Facility Project Record of Decision (900kb pdf) Grande Praire Wind Farm, O'Neill, NE Wilton IV Wind Energy Center EIS (DOE/EIS-0469) Upper Great Plains Wind Energy Programmatic EIS (DOE/EIS-0408)

76

Microsoft Word - HospEnergyMetrics&Guidance_Draft_2009_0908.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Hospital Energy Benchmarking Guidance - Version 1.0 08-Sep-2009 Hospital Energy Benchmarking Guidance - Version 1.0 08-Sep-2009 BC Singer et al., Lawrence Berkeley National Lab Hospital Energy Benchmarking Guidance - Version 1.0 Brett C. Singer Lawrence Berkeley National Laboratory, Berkeley CA Contributing Developers: Paul Mathew, Steve Greenberg, Bill Tschudi, Dale Sartor (LBNL) Susan Strom, Walter Vernon: Mazzetti Nash Lipsey Burch (San Francisco, CA) Abstract This document describes an energy benchmarking framework for hospitals. The document is organized as follows. The introduction provides a brief primer on benchmarking and its application to hospitals. The next two sections discuss special considerations including the identification of normalizing factors. The presentation of metrics is preceded by a description of

77

CEQ Collaboration in NEPA A Handbook for NEPA Practitioners  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Collaboration Collaboration in NEPA A Handbook for NEPA Practitioners o c t o b e r 2 0 0 7 c o u n c i l o n e n v i r o n m e n t a l q u a l i t y This handbook presents the results of research and consultations by the Council on Environmental Quality (CEQ) concerning the consideration of collaboration in analyses prepared under the National Environmental Policy Act (NEPA). It introduces the NEPA practitioner and other interested parties to the issue of collaboration, outlines general principles, presents useful steps, and provides information on methods of collaboration. The handbook is informational and does not establish new requirements for collaboration or public involvement. It is not and should not be viewed as formal CEQ guidance on this matter, nor are the recommendations in the handbook intended

78

CEQ NEPA & EMS Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Environmental Policy Act Processes with Environmental Management Systems c o u n c i l o n e n v i r o n m e n t a l q u a l i t y A Guide for NEPA and EMS Practitioners a p r i l 2 0 0 7 Preface This guide builds on research and consultations undertaken by the Council on Environmental Quality (CEQ) on the complementary aspects of the National Environmental Policy Act (NEPA) and Environmental Management Systems (EMS). It introduces issues and provides information on how NEPA and EMS can be aligned. This guide does not establish new requirements, does not constitute formal CEQ guidance, and its recommendations should not be considered legally binding. A Guide for NEPA and EMS Practitioners  Aligning National Environmental Policy Act Processes with Environmental Management Systems

79

Benefits of Site-wide NEPA Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Benefits of Site-wide NEPA Review Benefits of Site-wide NEPA Review Benefits of Site-wide NEPA Review The purpose of this guidance memorandum is to describe potential benefits of conducting a site-wide NEPA review (environmental impact statement or environmental assessment). I believe that this information will help program and field offices prepare their annual NEPA planning summaries and their overall NEPA compliance strategies. Site-wide reviews can aid the Department of Energy (DOE) in meeting its goals to streamline the NEPA process, to make that process more useful to decision makers and the public, and to reduce the time and cost required to prepare NEPA documents Benefits of Site-wide NEPA Review More Documents & Publications Benefits of Site-wide NEPA National Environmental Policy Act Review (1994)

80

NEPA Documentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Note for: Cynthia Quarterman Note for: Cynthia Quarterman Keith Harper From: Carol Borgstrom Subject: NEPA Documentation Date: December 3, 2008 Attached, per your request, are two lists: (1) DOE environmental assessments (EAs) issued since 12/1/2006 and (2) DOE environmental impact statements (EISs) issued since 12/1/2006. Also, per your request, is a copy of a general NEPA briefing provided to the Acting Deputy Secretary in May 2008. Please let me know if you have any further questions (carol.borgstrom @hq.doe.gov; 202-586-4600). cc: Ingrid Kolb, MA-1 (without attachments) Janet Barsy, GC-1 EA Database Listing Document Start FONSI Months Total NEPA Cost Program Number Title Date Date Complete Ops Office Office DOE/EA-1389 Charlie Creek-Williston Transmission 3/20/2001 2/20/2008 83.2 $345,236.21 WAPA

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Integrating Pollution Prevention with NEPA Planning Activities | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrating Pollution Prevention with NEPA Planning Activities Integrating Pollution Prevention with NEPA Planning Activities Integrating Pollution Prevention with NEPA Planning Activities The purpose of this memorandum is to advise you of the direction that the Environmental Protection Agency (EPA) and Council on Environmental Quality (CEQ) appear to be taking regarding pollution prevention and NEPA, and to encourage the use of the NEPA process to incorporate pollution prevention principles into the DOE planning and decisionmaking process. Integrating Pollution Prevention with NEPA Planning Activities More Documents & Publications Memorandum to Heads of Federal Departments and Agencies Regarding Pollution Prevention and the National Environmental Policy Act Guidance Regarding NEPA Regulations DOE NEPA Guidance and Requirements - Search Index - Table of Contents

82

Draft Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Implementation for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures in Covered Facilities (per 42 U.S.C. 8253(f), Use of Energy and Water Efficiency Measures in Federal Buildings) September 2012 U.S. Department of ENERGY United States Department of Energy Washington, DC 20585 i Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures in Covered Facilities (per 42 U.S.C. 8253(f), Use of Energy and Water Efficiency Measures in Federal Buildings) September 2012 I. PURPOSE ............................................................................................................................................ 1 II. BACKGROUND ................................................................................................................................. 1

83

Draft Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures  

NLE Websites -- All DOE Office Websites (Extended Search)

for the Implementation for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures in Covered Facilities (per 42 U.S.C. 8253(f), Use of Energy and Water Efficiency Measures in Federal Buildings) September 2012 U.S. Department of ENERGY United States Department of Energy Washington, DC 20585 i Guidance for the Implementation and Follow-up of Identified Energy and Water Efficiency Measures in Covered Facilities (per 42 U.S.C. 8253(f), Use of Energy and Water Efficiency Measures in Federal Buildings) September 2012 I. PURPOSE ............................................................................................................................................ 1 II. BACKGROUND ................................................................................................................................. 1

84

Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Closing the Circle: Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table of Contents Part I: Making of the Nuclear Weapons Complex, 1942-1955 1 The Manhattan Project: Genesis of the Complex 1 2 Health and Safety Concerns Environmental and Waste Management Concerns 3 The Atomic Energy Commission: Expansion of the Complex

85

NEPA Implementation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Implementation NEPA Implementation Selected documents providing guidance on the implementation of NEPA. September 7, 2012 OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution This Office of Management and Budget (OMB) and Council on Environmental Quality (CEQ) joint memorandum expands and builds on the November 28, 2005, Environmental Conflict Resolution (ECR) Memorandum, directing departments and agencies to increase the appropriate and effective use of third-party assisted environmental collaboration as well as environmental conflict resolution to resolve problems and conflicts that arise in the context of environmental, public lands, or natural resources issues, including matters related to energy, transportation, and water and land management.

86

National Environmental Policy Act (NEPA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management System » National Environmental Management System » National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Regulations and Links DOE NEPA Website NEPA Compliance Program (DOE O 451.1B) Council on Environmental Quality Citizen's Guide to the NEPA Recent NEPA Actions and Determinations Categorically Excluded Actions Environmental Assessments (EA) Durango, Colorado, EA for Renewable Energy (June 2011) Rocky Flats, Colorado, EA for Surface Water Configuration (May 2011) Environmental Impact Statements (EIS) Uranium Leasing Program Programmatic EIS (In Progress) Uranium Leasing Program Draft PEIS public comment period extended to May 31, 2013 Annual NEPA Planning Summaries 2013 2012 LM NEPA Compliance Officers (NCOs) Tracy Ribeiro, primary: (303) 410-4817

87

Guidance for writing permits for the use or disposal of sewage sludge. Draft report  

SciTech Connect

Section 405(d) of the Clean Water Act (CWA) directs the U.S. Environmental Protection Agency (EPA) to develop regulations containing guidelines for the use and disposal of sewage sludge. On February 19th, 1993, EPA published final regulations at 40 Code of Federal Regulations (CFR) Part 503 as the culmination of a major effort to develop technical standards in response to Section 405(d). These regulations govern three sewage sludge use and disposal practices: land application, surface disposal, and incineration. A key element in EPA's implementation of the Part 503 regulations is educating Agency and State personnel about these new requirements. Although the regulations are generally directly enforceable against all persons involved in the use and disposal of sewage sludge, they will also be implemented through permits issued to treatment works treating domestic sewage as defined in 40 CFR 122.22. Thus, the primary focus of the manual is to assist permit writers in incorporating the Part 503 requirements into permits; it serves as an update to the Guidance for Writing Case-by-Case Permit Conditions for Municipal Sewage Sludge (PB91-145508/HDM).

Not Available

1993-03-01T23:59:59.000Z

88

Consideration Of Cumulative Impacts In EPA Review of NEPA Documents |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consideration Of Cumulative Impacts In EPA Review of NEPA Documents Consideration Of Cumulative Impacts In EPA Review of NEPA Documents Consideration Of Cumulative Impacts In EPA Review of NEPA Documents The purpose of this guidance is to assist EPA reviewers of NEPA documents in providing accurate, realistic, and consistent comments on the assessment of cumulative impacts. The guidance focuses on specific issues that are critical in EPA's review of NEPA documents under Section 309 of the Clean Air Act. The guidance offers information on what issues to look for in the analysis, what practical considerations should be kept in mind when reviewing the analysis, and what should be said in EPA comments concerning the adequacy of the analysis. Consideration Of Cumulative Impacts In EPA Review of NEPA Documents More Documents & Publications

89

NEPA Updates | Department of Energy  

Office of Environmental Management (EM)

NEPA Updates Subscribe to DOE NEPA - Latest Documents and Notices Subscribe to DOE NEPA News The Office of NEPA Policy and Compliance maintains two notification services which...

90

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

User Access Policy - Version 1.0 User Access Policy - Version 1.0 DOE NSRC User Access Policy December 9, 2002 page 1 DRAFT General Policies and Procedures for User Access to the DOE Nanoscale Science Research Centers 1. Preamble The mission of the U.S. Department of Energy (DOE) Nanoscale Science Research Centers (NSRCs) is to support users in doing outstanding science in a safe environment. To this end, each Center must have: * An array of state-of-the-art equipment and laboratories for synthesis, fabrication, characterization, and simulation of nanoscale materials and structures * A skilled staff to support this equipment, users, and the associated science but above all * A user scientific program that provides leadership in nanoscale science and technology This document addresses the policies and procedures for user access to the NSRCs.

91

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA and Contracting Communities NEPA and Contracting Communities Take Action Following Workshops Innovative ideas for improving the Department’s NEPA contracting process emerged from the first gathering of field office and headquarters NEPA and procurement specialists at a workshop sponsored by the Office of NEPA Policy and Assistance, in partnership with the Office of Human Resources and Administration and the Office of General Counsel. The March 1996 NEPA Contracting Reform Workshop explored the theme of “Do It Right the First Time,” the central recommendation of the Phase II NEPA Contracting Reform Guidance that the Assistant Secretary for Environment, Safety and Health issued in December 1995. The March Workshop’s purpose was to identify contracting actions that can achieve NEPA process cost savings through better management of existing contracts and

92

Secretarial Memorandum on Integrating Project Management with NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretarial Memorandum on Integrating Project Management with NEPA Secretarial Memorandum on Integrating Project Management with NEPA Compliance to Improve Decision Making Secretarial Memorandum on Integrating Project Management with NEPA Compliance to Improve Decision Making June 12, 2012 - 4:14pm Addthis Declaring that "Compliance with [NEPA] is a pre-requisite to successful implementation of DOE programs and projects," the Secretary has signed a memorandum on "Improved Decision Making through the Integration of Program and Project Management with National Environmental Policy Act Compliance." The memo urges better use of existing tools and guidance, and highlights principles for strengthening NEPA compliance - for example, through Field and Headquarters teamwork, realistic schedules, and performance

93

DRAFT  

NLE Websites -- All DOE Office Websites (Extended Search)

⇒ ⇒ DRAFT 19 December 2012⇐= Status of the heaviest elements as of January 2013 Don Groom, Particle Data Group Superheavy elements are normally synthesized by exposing a high-Z target to a 2.5-7.5 MeV/u ion beam such as 48 Ca or 70 Zn. The target can be a stable isotope such as 208 Pb or 209 Bi; in this case the process is called cold fusion. If the target is radioactive (an actinide), it is a "hot fusion" reaction. Targets as heavy as 249 Bk have been used. Since fusion is followed by neutron loss (e.g. 248 Cf( 48 Ca,4n) 292 Lv), the atomic numbers of the beam and target nuclei determine whether the fusion products have even or odd Z. The main laboratories involved are at Dubna, Darmstadt, Berkeley, and RIKEN Nashina Center. Fusion cross sections steadily decrease with increasing Z, and are in the picobarn range for the heaviest elements. The cross section can be optimized for a given

94

NEPA Lessions Learned Quarterly Report - 4th Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DECEMBER 1998 DECEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1998 December 1, 1998, Issue No. 17 New and Improved NEPA Compliance Guide Issued in 2 Volumes A new and improved DOE NEPA Compliance Guide, issued by the Office of Environment, Safety and Health, has been distributed to about 750 members of the DOE NEPA Community. Intended to foster sound and efficient NEPA compliance, the Compliance Guide is a collection of resources and references to aid in NEPA document preparation and other aspects of the NEPA process. Volume I, General NEPA References, contains the statute, and regulations and guidance from the Council on Environmental Quality, the Department of State, and the

95

NEPA | Open Energy Information  

Open Energy Info (EERE)

NEPA NEPA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Casual Use Determination of NEPA Adequacy Categorical Exclusion Environmental Assessment Environmental Impact Statements Print PDF NEPA-Related Documents General Document Collections (178) Documents Regulatory Roadmap FONSI Graphic illustrating the components of the NEPA process. The National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 et seq.) - Enacted in 1970, NEPA established a national policy to encourage productive and enjoyable harmony between man and his environment and to promote the prevention and elimination of damage to the environment and biosphere. At the heart of NEPA is the requirement that federal agencies or departments must consider the environmental impacts of all major federal

96

Mini-Guidance Articles from Lessons Learned Quarterly Reports...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by the DOE Office of NEPA Policy and Compliance in consultation with the Office of General Counsel, the DOE NEPA Community, and others. The mini-guidance articles were...

97

Drafted by Kelly Haslam Last Updated April 2012  

E-Print Network (OSTI)

Drafted by Kelly Haslam Last Updated April 2012 Guidance on Named Options Definition Major: Human Ecology Option: Civil Society and Community Research #12; Drafted by Kelly Haslam

Sheridan, Jennifer

98

CEQ Environmental Justice Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JUSTICE JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 ii Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 B. Principles for Considering Environmental Justice under NEPA . . . . . . . . . . . . . 8 1. General Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2. Additional Considerations . . . . . . . . . . . . . . . . . . . . . .

99

Federal Agency NEPA Procedures  

Energy.gov (U.S. Department of Energy (DOE))

Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

100

Benefits of Site-wide NEPA National Environmental Policy Act Review (1994)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Benefits of Site-wide NEPA National Environmental Policy Act Review Benefits of Site-wide NEPA National Environmental Policy Act Review (1994) Benefits of Site-wide NEPA National Environmental Policy Act Review (1994) The purpose of this guidance memorandum is to describe potential benefits of conducting a site-wide NEPA review (environmental impact statement orenvironmental assessment). Site-wide reviews can aid the Department of Energy (DOE) in meeting its goals to streamline the NEPA process, to make that process more useful to decision makers and thepublic, and to reduce the time and cost required to prepare NEPA documents. Benefits of Site-wide National Environmental Policy Act (NEPA) Review More Documents & Publications Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005 "Frequently Asked Questions" on the Department of Energy's NEPA Regulations

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Benefits of Site-wide NEPA National Environmental Policy Act Review (1994)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Benefits of Site-wide NEPA National Environmental Policy Act Review Benefits of Site-wide NEPA National Environmental Policy Act Review (1994) Benefits of Site-wide NEPA National Environmental Policy Act Review (1994) The purpose of this guidance memorandum is to describe potential benefits of conducting a site-wide NEPA review (environmental impact statement orenvironmental assessment). Site-wide reviews can aid the Department of Energy (DOE) in meeting its goals to streamline the NEPA process, to make that process more useful to decision makers and thepublic, and to reduce the time and cost required to prepare NEPA documents. Benefits of Site-wide National Environmental Policy Act (NEPA) Review More Documents & Publications Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005 "Frequently Asked Questions" on the Department of Energy's NEPA Regulations

102

NEPA Lessons Learned Quarterly Report 1st Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEARNED LEARNED LESSONS N E P A Inside LESSONS LEARNED March 1, 1996 Quarterly Report LESSONS LEARNED National Environmental Policy Act U.S. Department of Energy Welcome to the newly-revised Quarterly Report of Lessons Learned in the NEPA process. In response to reader suggestions, we have expanded the scope of the report to provide a wider variety of NEPA- related information, and enhanced the format for better clarity and overall readability. This Quarterly Report includes: * NEPA lessons learned at the Hanford Site - Page 1 * Mini-guidance on the preparation of EIS summaries, properly eliminating alternatives and impacts from detailed analysis, application of DOE NEPA regulations to procurement, and NEPA questions and answers - Pages 3-6 * Updates on the proposed amendments to DOE's NEPA

103

Directory of Potential Stakeholders for DOE Actions under NEPA | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directory of Potential Stakeholders for DOE Actions under NEPA Directory of Potential Stakeholders for DOE Actions under NEPA Directory of Potential Stakeholders for DOE Actions under NEPA DOE Offices are encouraged to be inclusive in providing potentially interested parties with opportunities to review NEPA documents. This Directory of Potential Stakeholders for DOE Actions under NEPA is primarily intended to supplement lists that Departmental Offices compile for individual projects or facilities. It complements the EIS Distribution Guidance. The Office of NEPA Policy and Compliance updates this Directory annually in July and may issue revisions throughout the year as new information becomes available. NEPAStakeholdersDirectory_10_29_13.pdf More Documents & Publications Diversity Employment and Recruitment Sources

104

National Environmental Policy Act (NEPA) Compliance Guide, Sandia National Laboratories  

SciTech Connect

This report contains a comprehensive National Environmental Policy Act (NEPA) Compliance Guide for the Sandia National Laboratories. It is based on the Council on Environmental Quality (CEQ) NEPA regulations in 40 CFR Parts 1500 through 1508; the US Department of Energy (DOE) N-EPA implementing procedures in 10 CFR Part 102 1; DOE Order 5440.1E; the DOE ``Secretarial Policy Statement on the National Environmental Policy Act`` of June 1994- Sandia NEPA compliance procedures-, and other CEQ and DOE guidance. The Guide includes step-by-step procedures for preparation of Environmental Checklists/Action Descriptions Memoranda (ECL/ADMs), Environmental Assessments (EAs), and Environmental Impact Statements (EISs). It also includes sections on ``Dealing With NEPA Documentation Problems`` and ``Special N-EPA Compliance Issues.``

Hansen, R.P. [Hansen Environmental Consultants, Englewood, CO (United States)

1995-08-01T23:59:59.000Z

105

NEPA Stakeholders Directory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Policy Act N E P A DIRECTORY of POTENTIAL STAKEHOLDERS for DOE ACTIONS under NEPA 28 th Edition July 2011 U.S. Department of Energy Office of NEPA Policy and Compliance United States Government Department of Energy memorandum DATE: July 28, 201 1 REPLY TO ATN OF: Office of NEPA Policy and Compliance (C. Chen, GC-54,202-586-0733) SUBJECT: Directory of Potential Stakeholders for DOE Actions under NEPA: 2gth Edition TO: DOE NEPA Community I am pleased to announce that the 2sth edition of the Directory of Potential Stakeholders for DOE Actions under NEPA, dated July 20 1 1, is now posted on the DOE NEPA website (http://ne-pa. enerm. gov/documents/StakeholdersDirectory. pdfl. The Directory is intended to supplement distribution lists that DOE Offices compile for particular projects or facilities

106

Established and Revised Federal Agency NEPA Procedures, 2000 - 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Revised Federal Agency NEPA Procedures, 2000 - 2011 and Revised Federal Agency NEPA Procedures, 2000 - 2011 ` Established and Revised Federal Agency NEPA Procedures Last Updated on January 11, 2013 Department/Agency Action Title/Citation Federal Register Notice(s) 2000 Department of Health and Human Services Revised NEPA Procedures Revised General Administration Manual, HHS Part 30, Environmental Protection Published for comment on January 11, 1999 (64 Federal Register [FR] 1655). Published as final procedures on February 25, 2000 (65 FR 10229). Bureau of Reclamation Department of the Interior Notice of Availability of a Draft Agency Handbook on the National Environmental Policy Act Department Manual (DM) Part 516, Chapter 6: Managing the NEPA Process (Appendix 7) Published on April 20, 2000 (65 FR 21210) with

107

Federal NEPA Contacts  

Energy.gov (U.S. Department of Energy (DOE))

CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law attorney, or member of agency leadership, these...

108

Draft Enivonmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

109

Need to Consider International Destructive Acts in NEPA Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-89) 8-89) EFG (07-90) United States Government Department of Energy memorandum DATE: December 1,2006 REPLY TO A T ~ N OF: Office of NEPA Policy and Compliance (ECohen: 202-586-7684) SUBJECT: Need to Consider Intentional Destructive Acts in NEPA Documents TO: DOE NEPA Community (list attached) In light of two recent decisions by the United States Court of Appeals for the Ninth Circuit, DOE National Environmental Policy Act (NEPA) documents, including environmental impact statements (EISs) and environmental assessments (EAs), should explicitly address potential environmental consequences of intentional destructive acts (i.e., acts of sabotage or terrorism). This interim guidance has been developed by the Office of NEPA Policy and Compliance, in consultation with the Assistant General

110

Army Policy Guidance for UESCs  

Energy.gov (U.S. Department of Energy (DOE))

Presentationgiven at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meetingprovides an overview of the U.S. Army's utility energy service contract (UESC) program and its UESC draft policy guidance.

111

NEPA Lessons Learned Questionnaire  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learned Questionnaire Learned Questionnaire Office of NEPA Policy and Compliance U.S. Department of Energy Preface Your timely completion of this questionnaire will aid the Office of NEPA Policy and Compliance in meeting its responsibility to foster continuing improvement of the Department of Energy's National Environmental Policy Act process. In accordance with DOE Order 451.1B, National Environmental Policy Act Compliance Program, NEPA Document Managers and NEPA Compliance Officers should fill out a questionnaire (separately or jointly) as soon as possible after completing each environmental impact statement (EIS) and environmental assessment (EA). Other document preparation team members are encouraged to also submit a questionnaire. The questionnaire is designed to structure your responses, but you should feel free to attach a statement describing

112

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

f8J 0 Hazardous A. ir Pollutants? Is the project subject to emissions limitations in an Air Quality 0 f8J 0 Control Region? 2 Revised on: 1111212008 NEPA COMPLIANCE SURVEY Impacts...

113

NEPA COMPLIANCE SURVEY NEPA Review Routing Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Review Routing Form NEPA Review Routing Form A ::opy of I \ I I ..... Forwarded Forwarded To Date i-t l.tlbrub ~ r:H:.. ~rrr

114

Department of Energy - DOE, NEPA and You - A Guide to Public...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Department of Energy - DOE, NEPA and You - A Guide to Public ParticipationPermitting...

115

DRAFT PROPOSAL EPA-402R-10003  

E-Print Network (OSTI)

DRAFT PROPOSAL EPA-402R-10003 FEDERAL GUIDANCE REPORT NO. 14 Radiation Protection Guidance This document is Federal Guidance Report No. 14 (FGR 14), "Radiation Protection Guidance for4 Diagnostic Environmental Protection9 Agency (EPA) as part of Reorganization Plan No. 3 of 1970 (Dunn et al. 2012). Under

116

Benefits of Site-wide National Environmental Policy Act (NEPA) Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3258 3258 (08.93) United States Government Department of Energy - memorandum DATE: REPLY TO ATTN OF: SUBJECT: TO: December 15, 1994 Office of NEPA 0versight:Strickler:202-568-2410 Benefits of Site-wide National Environmental Policy Act (NEPA) Review Distribution The purpose of this guidance memorandum is to describe potential benefits of conducting a site-wide NEPA review (environmental impact statement or environmental assessment). I believe that this information will help program and field offices prepare their annual NEPA planning summaries and their overall NEPA compliance strategies. Site-wide reviews can aid the Department of Energy (DOE) in meeting its goals to streamline the NEPA process, to make that process more useful to decision makers and the public, and to reduce the time and cost required to prepare NEPA documents. Background on DOE's at)proachto site-wide

117

Oak Ridge National Laboratory's philosophy and approach to NEPA  

SciTech Connect

At Oak Ridge National Laboratory (ORNL), the overall responsibility for compliance with the National Environmental Policy Act (NEPA) resides with Environmental Review and Documentations Section that is within the Office of Environmental Compliance and Documentation (OECD). Organizationally, OECD is a line-management division reporting to the Director for Environmental, Safety and Health Compliance. The cornerstone for NEPA compliance at ORNL is the Internal Environmental Assessment (IEA), which is designed to provide a basis for NEPA review and documentation. The Standard Operating Procedures provide for evaluation and documentation records management and training, and auditing. The IEA provides a project description and a review of environmental, health and safety issues. The completed IEA is used to make recommendations to DOE regarding the appropriate level of NEPA documentation required for the action. NEPA documents which may be prepared include the Categorical Exclusion, Abbreviated Environmental Assessment, and Environmental Assessment; actions requiring Environmental Impact Statements are prepared by US Department of Energy (US DOE). The relatively recent DOE initiative for agency-wide compliance with NEPA has created areas in which ORNL has found itself lacking adequate resources and expertise. These are discussed in this paper. Throughout ORNL, there is strong management support for compliance with NEPA which has resulted in enhanced awareness and implementation of the NEPA requirements. Guidance is being provided and Laboratory divisions are factoring early integration of NEPA into their project planning with the goal of ensuring that their activities are carried out in full compliance with the letter and the spirit of NEPA and the other environmental statutes and regulations.

Van Hook, R.I.; Braunstein, H.M.; Sigal, L.L.; Trettin, C.C.

1991-01-01T23:59:59.000Z

118

Federal Agency NEPA Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

119

Annual NEPA Planning Summary Report template 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project 1162014 Estimated Schedule (NEPA Milestones) Page 1 WVDP-NEPA-APS-2014 NEPA Document Title, Location, Document Number Discussion of Mitigation Commitments and...

120

DOE NEPA Compliance Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Compliance Officers NEPA Compliance Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. Please send updates to yardena.mansoor@hq.doe.gov Oct 04, 2013 Forrestal (FORS) Addresses: Germantown (GTN) Addresses: 1000 Independence Ave SW 1000 Independence Ave SW Washington, DC 20585 Washington, DC 20585-1290 . Use for U.S. Postal Service mail. 19901 Germantown Road Germantown, MD 20874-1290 Use for EXPRESS DELIVERY (e.g. Federal Express, UPS). NAME, OFFICE, E-MAIL FAX ADDRESS PHONE william.bierbower@hq.doe.gov Advanced Research Projects Agency-Energy 202-287-6585 FORS AR-1 20585 ARPA-E William Bierbower lori.gray@go.doe.gov Energy Efficiency and Renewable Energy, Golden Field Office 720-356-1568 720-356-1350 Department of Energy

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

ederal NEPA Contacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATE NEPA CONTACTS: STATE NEPA CONTACTS: State and Agency: NEPA Regulation: Name: Address: Phone/Email/Website: California Office of Planning and Research/ State Clearinghouse CAL. PUB. RES. CODE §§ 21000 - 21177 Mr. Scott Morgan Director of State Clearinghouse 1400 Tenth Street, Room 212 Sacramento, CA 95814 916-445-0613 state.clearinghouse@opr.ca.gov http://opr.ca.gov/index.php?a=c eqa/index.html Connecticut Office of Policy and Management CONN. GEN. STATE. ANN. §§ 22a-1 to -1i Mr. Dimple Desai Director of CEPA 450 Capitol Avenue Hartford, CT 06106- 1308 860-418-6412 860-418-6200 (fax) Dimple.desai@ct.gov http://www.ct.gov/opm District of Columbia Department of Consumer and Regulatory Affairs D.C. STAT. §§ 8-109.01 to -109.11 Mr. Ibrahim Bullo

122

NEPA Compliance Officer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Officer Compliance Officer Award #: EE 000 0784 Recipient: County of Escambia ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) MC Blanchard Judicial Center B5.1 Historic Preservation Clause and Old Courthouse Block Waste Stream Clause Office Complex EEIP Road Prison Geothermal Earth Coupled HVAC Upgrade A9, All Allowable Activities: Information gathering, data collection, reporting, and preliminary design. Prohibited Activities: Implementation of final design, construction, and operation tasks for this project should be conditioned pending further NEPA review. Landfill Gas Extraction and Control System A9, All Allowable Activities: Information gathering,

123

Tribal Energy NEPA Fundamentals Workshop  

Office of Energy Efficiency and Renewable Energy (EERE)

The Tribal Energy NEPA Fundamentals Workshop is a three-day workshop for tribes to understand how to manage the National Environmental Policy Act (NEPA) process and implement the Council on...

124

Army Guidance for UESCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of 11 of 11 Randy Smidt / DAIM-ODF-E / (703) 601-1564 (DSN 329) / SmidtRF@conus.army.mil 071400AUG2008 ARMY STRONG Army Policy Guidance for Utility Energy Services Contracts presented at The Federal Utility Partnership Working Group 5 MAY 2009 by Randy Smidt Headquarters Dept of Army, Office of the Assistant Chief of Staff for Installation Management 2 of 11 Randy Smidt / DAIM-ODF-E / (703) 601-1564 (DSN 329) / SmidtRF@conus.army.mil 071400AUG2008 ARMY STRONG Overview of Army UESC Program & Draft Policy Guidance * Army UESC Program * Draft Policy Guidance o Organizations, responsibilities & relationships o Procedures o Management & Execution o Resource Requirements o Reporting Requirements o Case Studies 3 of 11 Randy Smidt / DAIM-ODF-E / (703) 601-1564 (DSN 329) / SmidtRF@conus.army.mil

125

Guidance Related to Analysis of Impacts to Workers in National Policy Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance Related to Analysis of Impacts to Workers in National Guidance Related to Analysis of Impacts to Workers in National Policy Act (NEPA) Documentation Guidance Related to Analysis of Impacts to Workers in National Policy Act (NEPA) Documentation The purpose of this memorandum is to provide general guidance regarding the analysis of impacts to workers in DOE environmental impact statements (EISs) and environmental assessments (EAs) in order to assist DOE program and field offices in meeting the requirements of NEPA and to establish a general consistency in the Department's NEPA documentation. This guidance was prompted by several questions raised in this regard and was developed by the Office of NEPA Project Assistance, after consultation with the Office of General Counsel. Guidance Related to Analysis of Impacts to Workers in National Policy Act

126

NEPA Lessons Learned Quarterly Report, March 1, 2004; Issue No. 38; First Quarter FY 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2004 March 2004 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT First Quarter FY 2004 March 1, 2004; Issue No. 38 LESSONS LEARNED LEARNED LESSONS Need Help Preparing NEPA Documents? New, Improved "Green Book" Is on the Way (continued on page 15) By: Carl Sykes, Office of NEPA Policy and Compliance Carl Sykes is leading the charge to strengthen the Green Book, DOE's NEPA primer. The time has come for the DOE NEPA Community to work together to strengthen our basic NEPA guidebook, Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements (also known as the "Green Book"). The Green Book (www.eh.doe.gov/nepa under Guidance) is certainly no weakling: it provides succinct recommendations for key

127

OpenEI Community - NEPA  

Open Energy Info (EERE)

Geothermal NEPA Geothermal NEPA Workshop at GRC http://en.openei.org/community/blog/geothermal-nepa-workshop-grc On Tuesday, October 2, the Geothermal Technology Office and the National Renewable Energy Laboratory held a 1/2-day NEPA workshop.  The workshop was held at the MGM Grand in Las Vegas, in conjunction with the GEA/GRC Tradeshow and Conference.  Three presentations were given, describing the NEPA database and associated analysis that had been conducted in 2013.

Files: 

128

NEPA History | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

History History NEPA History Selected documents providing historical information on NEPA. June 14, 2012 Federal Register Notices for DOE NEPA Guidelines and Regulations Historical compilation of Federal Register notices for DOE NEPA guidelines and regulations. December 31, 2009 Presidential Proclamation on the 40th Anniversary of the National Environmental Policy Act Proclamation of President Obama to "call upon all executive branch agencies to promote public involvement and transparency in their implementation of the National Environmental Policy Act." July 1, 1999 EPA's Section 309 Review: The Clean Air Act and NEPA This document discusses Section 309 of the Clean Air Act, which authorizes the Environmental Protection Agency to review certain proposed actions of

129

Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005  

Energy.gov (U.S. Department of Energy (DOE))

The articles in this collection, organized by topic, contain procedural interpretations and recommendations developed by the DOE Office of NEPA Policy and Compliance in consultation with the Office of General Counsel, the DOE NEPA Community, and others. The mini-guidance articles were developed to address problems identified in the course of preparing, reviewing, and issuing NEPA documents.

130

NEPA | OpenEI Community  

Open Energy Info (EERE)

NEPA NEPA Home Kyoung's picture Submitted by Kyoung(155) Contributor 14 October, 2013 - 20:19 Geothermal NEPA Workshop at GRC Categorical Exclusions CX Database EA EIS FONSI GEA GRC GRR NEPA On Tuesday, October 2, the Geothermal Technology Office and the National Renewable Energy Laboratory held a 1/2-day NEPA workshop. The workshop was held at the MGM Grand in Las Vegas, in conjunction with the GEA/GRC Tradeshow and Conference. Three presentations were given, describing the NEPA database and associated analysis that had been conducted in 2013. Files: application/vnd.openxmlformats-officedocument.presentationml.presentation icon 2. NEPA History - Presentation application/vnd.openxmlformats-officedocument.presentationml.presentation icon 3. Categorical Exclusions - Presentation

131

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Project lnfonnation Project Title: Change out down guy on power pole Date: 2-8-10 DOE Code : Contractor Code: Project Lead: Mike Preston Project Overview 1 What are the environmental No impact to the environment impacts? Power pole east of B-1 -33 2. What is the legal location? 3. What is the duration of the project? 3Hr 4. What major equipment will be used if any (worl< over rig, drilling rig, Backhoe and operator for equ1 pment etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE; If ChiingNEPA Compllai"'Ce Survey alld contact Ut TlrCh.,lcal Assunlnce DepartmenL Impacts If YES, then complete below

132

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Project lnfonnation Project Title: New Drilling Location in Section 29 Date: 12-10-2009 DOE Code: 6730.020.78002 Contractor Code: 8067-371 Project Lead: Mark Duletsky Project Overview The project will involve excavating 3-4 backhoe pits to a depth of about 8 feet to observe soil characteristics 1. What are the environmental impacts? in the vicinity of our planned reserve pit excavation area. 2. What is the legal location? NE 1/4, SE 1/4, Sec. 29. T39N. R78W. Natrona County, Wyoming 3. What is the duration of the project? 4. What major equipment will be used 1 day if any (work over rig, drilling rig, etc.)? Backhoe The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

133

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Project l nfonnation Project Title: Reclamation ofT-2-14 Date: 11/2412009 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview We will be removing old piping from the treater@ T-2-14. We will also remove the berm and grade and 1. What are the environmental impacts? reclamate location. The duration of this project will be approx. 2 days. Equipment that will be used is as follows backhoe. dumptruck, blade,and a tiller so we can seed with native grasses. 2. What is the legal location? 3. What is the duration of the project? 4. What major equipment will be used if any (woO< over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

134

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Project lnfonnation Project Title: Replace electrical line from well to power pole Date: 3/10/2010 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview No impact to the environment. 1. What are the environmental impacts? Dig up old electrical line from pumping unit on 61-S-34 to power pole east of well , {approximately 75 feet 2. What is the legal location? from unit) and replace with new line. 3. What is the duration of the project? 4. What major equipment will be used 1 day if any (work over rig , drilling rig , etc.)? Electrician, ditch witch and operator for equipment The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

135

RM Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Environmental Review-NEPA Categorical exclusions are posted here to promote transparency and openness. Some actions may have environmental impacts that require an environmental assessment and a detailed analysis to determine the extent and severity of the impacts. For actions that have significant impacts or consequences to the environment or human health, RM prepares environmental impact statements. Environmental Impact Statements-EIS Estes-Flatiron Transmission Line Rebuild Project Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project Hermosa West Wind Energy Project Maintenance and Vegetation Management along Existing Western TransmissionLine Rights of Way on National Forest System Lands in Colorado, Utah, Nebraska Platte River Cooperative Agreement PEIS, NE, CO and WY, DOE/EIS-0295 (Cooperating Agency)

136

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 81 Project lnfonnation Project Title: CBM Gas Separator Date: 2-23-2010 DOE Code: 6720-020-51131 Contractor Code: Project Lead: Mark Duletsky Project Overview None anticipated, uses producing well on pre-existing location. 1. What are the environmental impacts? 48-2-X-28 Location, 447' FSL. 2495 FWL, SE, SW, Sec. 28, T39N, R78W, Natrona County. Wyoming USA 2. Wnat is the legal location? 3. What is the duration of the project? 5days 4. What major equipment will be used if any (work over rig, drilling rig, Forkfift. winch truck. water truck etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Special ist and the DOE NEPA Compliance Officer. NO'TE: H Change of Scope occurs, Proj ect Lead m u st $ubmlt a new NEPA Compllance Suntey and

137

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Project lnfonnation Project Title: C-EAG. Maintenance I grading of existing roads Date: 8/4/2011 and road drainages (barrow ditches): ex 81.3 DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview 1. Brief project description [include C-EA 6. Maintenance I grading of existing roads and road drai nages anything that could impact the (barrow ditches) : ex 81.3 environment] Existing roads defined as per May 2010 Aerial Photos. (Changing out culverts, grading I modifying embankments, etc., that has potential to impact wetlands, requires a NCS.) The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

138

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Project lnfonnation Project Title: Restoration of 77 -13-SX-3 Date: 2-8-1 0 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview We will be restoring 77-SX-3 per procedure. 1. What are the environmental impacts? The duration of this project will be 3-4 days. 2. What is the leg al location? 3. What is the duration of the project? The equipment to be used will be Backhoe, welder, tiller dump truck. 4. What major equipment will be used if any (work over rig , drilling rig , We will take oil contaminated dirt to the Eastside landfarm and backfill with d ean fill dirt from sec. 20. etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

139

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Project lnfonnation Project Title: e-EA5. Reclamation of well sites Date: 8/4/2011 DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview e-EA 5. Reclamation of wellsites : ex 81.3 and ex 86.1 1. Brief project description [include anything that could impact the Small-scale, short-term cleanup actions including excavation and environment] consolidation of contaminated soils, removal of underground piping, removal of rig anchors or T-bars, drainage control , transport and backfilling of clean soil I fill dirt, and reseeding . The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

140

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ -o ~ ~ -o Project lnfonnation Project Title: Replace Down Guy Rod 24~3 Date: 11/30/09 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview Replace Down Guy Rod Emergency The pole was ready to Break Wire 5' above the ground 1. What are the environmental impacts? 24-SHX-3 2. What is the legal location? 3. What is the duration of the project? 5 hr 4. What major equipment will be used if any (work over rig, drilling rig, etc,)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTe If Change of Scope oe~. Project Lead must sutlmft a new NEPA ColT pll~ Sunley and c ontact the T echnical Assurance Department. Impacts If YES, then complete below

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Council on Environmental Quality Collaboration in NEPA A Handbook for NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Council on Environmental Quality Collaboration in NEPA A Handbook Council on Environmental Quality Collaboration in NEPA A Handbook for NEPA Practitioners Council on Environmental Quality Collaboration in NEPA A Handbook for NEPA Practitioners Council on Environmental Quality Collaboration in NEPA A Handbook for NEPA Practitioners Collaboration in NEPA - a Handbook for NEPA Practitioners is a collaboration of research and consultations by CEQ concerning analyses prepared under NEPA. Updated in the Fall of 2007, this 100-page guide introduces interested parties to collaborative principles, and includes suggestions for successful collaborative efforts. CEQ Collaboration in NEPA A Handbook for NEPA Practitioners More Documents & Publications OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution

142

Review Draft Review Draft  

E-Print Network (OSTI)

Review Draft Review Draft Columbia Basin White Sturgeon Planning Framework Prepared a favorable review of specific sturgeon projects but noted that an effective basin-wide management plan passage. A planning framework (this document) was drafted based on a review and synthesis of published

143

LM Annual NEPA Planning Summary 2014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 More Documents & Publications 2010...

144

National Environmental Policy Act (NEPA) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Environmental Management System National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Regulations and Links DOE NEPA Website NEPA Compliance Program...

145

NEPA Lessons Learned, September 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 Register through the DOE NEPA Conference Web site at www.NEPA35.org National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Third Quarter FY 2005 September 1, 2005; Issue No. 44 LESSONS LEARNED LEARNED LESSONS To observe the 35th anniversary of the National Environmental Policy Act (NEPA), the Department of Energy's (DOE's) Office of Environment, Safety

146

National Environmental Policy Act (NEPA)...  

National Nuclear Security Administration (NNSA)

National Environmental Policy Act (NEPA) Process ENERGY U.S. DEPARTMENT OF Steps to SWEIS Development Notice of Intent to Prepare SWEIS Public Scoping Period Opportunities for...

147

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Project Information Project Title: Survey Centralizer Design Date: 2-10-2010 DOE Code: 6730.020.71091 Contractor Code: 8067-762 Project Lead: Frank Ingham Project Overview 1. What are the environmental No environmental impacts. impacts? Run a logging tool through existing wells at : 2. What is the /ega/location? 67-LBT-3, SW SE sec 3, T38N , R78W 86-1 -X-10 , NE SE Sec 10, T38N , R78W 3. What is the duration of the project? 22-2-X-10H , NW NW Sec 10, T38N , R78W 4. What major equipment will be used if any (work over rig , drilling rig, 4 Days etc.)? Stinger truck or crane . The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and

148

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA COMPLIANCE SURVEY NEPA COMPLIANCE SURVEY # 350 8 Revised 8/2/10 mjt Attachment 1 Written by Dan Smallwood Production Enhancement Project-5 T-2-34 to T-1-33 MIT all wells in this area to determine which are producing wells. There are 15 wells shut in this area because of no tank or shipping line. According to the old test sheet these wells make 24bbls oil and 120bbls of water. Two of these wells have leaks in the flow lines that will be fixed. One is 33-S-34 which could be run to 34-AX-34, about 400' .6 bbl/pd and the other is 35 shx 34 which could be run to 35-AX-34 which is about 200'.5bbl/pd. 42-AX-34 could be ran to 32-AX-34 and then to 33-SX-34 to 34-AX-34. There are two manifolds at T-2-34, one with 10 wells and the other with 12. None of the flow lines have valves or checks in the lines. I propose we flush, disconnect, and plug all wells that

149

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

150

National Environmental Policy Act (NEPA)  

Energy.gov (U.S. Department of Energy (DOE))

All Electricity Delivery and Energy Reliability (OE) projects are reviewed under the National Environmental Policy Act (NEPA) of 1969 42 U.S.C. Section 4321 et seq. The Department of Energy regulations that implement NEPA require OE to determine whether a proposal requires preparation of an Environmental Impact Statement (EIS), an Environmental Assessment (EA), or a Categorical Exclusion (CX).

151

Microsoft Word - NEPA Fact Sheet 082814.doc  

National Nuclear Security Administration (NNSA)

NEPA process does not dictate that an agency select the most environmentally beneficial alternative. The purpose of the NEPA process is to ensure that accurate environmental...

152

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-$ )_Jp ~ R -$ )_Jp ~ R tW" I Project lnfonnation Project Title: New Drilling Location in Section 29 Date: 12-10-2009 DOE Code: 6730.020.78002 Contractor Code: 8067-371 Project Lead: Mar1< Duletsky Project Overview The project will involve excavating ~ backhoe pits to a depth of about 8 feet to observe soil characteristics 1. What are the environmental impacts? in the vicinity of our planned reserve pit excavation area. 2. What is the legal location? NE 1/4, SE 1/4, Sec. 29, T39N, R78W, Natrona County, Wyoming 3. What is the duration of the project? 4. What major equipment will be used 1 day if any (worn over rig, drilling rig, etc.)? Backhoe The table below is to be completed by the Project Lead and reviewed by the E. nvironmental Specialist and the DOE NEPA

153

SN Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Rates You are here: SN Home page > Environment Environmental Review-NEPA Major Initiatives are the large projects that SNR is currently involved in. As new projects are added, and existing ones completed, you will find current information and updates in this area. Environmental Impact Statement-EIS Sacramento Area Voltage Support Trinity PUD Interconnection Projects Alternative Intake Project Transmission Line and Interconnection Delta-Mendota Canal / California Aqueduct Intertie (PDF - 17MB) Sutter Power Project San Luis Transmission Project Environmental Assessment-EA San Joaquin Valley Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Categorical Exclusions-CX Cottonwood - Roseville OPGW Project CX (PDF - 6787KB)

154

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

lnfonnat lnfonnat lon Project Title: Geothennal Technologies Program I Date : II0/20/09 DOE Code: 6730.020.61 041 I Contractor Code: lso67-73t Project Lead: Lyle Johnson TillS NEPA is for the laying of a 2.975 foot. 8" welded plastic wata ltnc from Lillie Teall<'!(~ Project Overview 1. 'Mlat are the environmental ncar in the Intersection with Teapot Creek to the North Waterllood Facility (NW F) building. The impacts? entire project area is within Section 21 T39N R 78W (map attached) and will not impact any wet 2. 'Mlat is the legal location? land areas but will cross one in tcnnittcnt stream. The stream is presently dry. The project will 3. 'Mlat is the duration of the project? include the clearing of vegetation from a 12 foot wide construction corridor along the route, digging

155

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D Project lnfonnation Project Title: Emergency flowline repair 78-sx-34 & 68-66-sx-34 Date: 12-29-09 DOE Code: Contractor Code: Project Lead: RickM. Project Overview We dug up the line where the oil was coming out of the ground and had to put 2 clamps on to seal the leak. 1. What are the environmental impacts? The contaminated dirt was hauled to the land farm and after the line was tested we backfilled the hole. this job took 5 hrs. to complete and required a backhoe and two hands. this leak was 100 yards south of well No. 2. What is the legal location? 68-66-sx-34. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

156

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project lnfonnation Project Title: Restoration 72-12-SX-1 0 Date: 2/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview We will be restoring 71-12-SX1 0. This will include digging 5ft down and cutting well head off and placing 1. What are the environmental impacts? OHM. We will haul contaminated soils to the Eastside landfarm and record in log book. We will replace all dirt hauled off with clean fill from sec.20. 2. What is the legal location? 71-12 SX10 3. What is the duration of the project? Approximately 3-4 days 4. What major equipment will be used if any (work over rig , drilling rig , Backhoe with operator, welder, tiller and one worker. etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

157

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Project lnfonnation Project Title: Geothennal Technologies Program Date: 12-11-09 DOE Code: 6730.020.61041 Contractor Code: Project Lead: Lyle Johnson Project Overview This NEPA is for the laying of a 350 foot. 8" welded plastic water line from the lower cooling pond at the 1. What are the environmental Tensleep battery to a location between the 5,000 bbl tank and the top pond at the Tensleep battery. The impacts? entire project area is within Section 10 T39N R78VV (map attached) and will not impact any wet land areas. 2. What is the legal location? The project will include the clearing of sparse vegetation from a 12 foot wide construction corridor along the 3. What is the duration of the project? route, digging a 5 foot deep trench. welding and placing the plastic line and covering and compacting the

158

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 'f>lf,M/9-~ ~of- Project lnfq,gnation Project Title: WhisperGenARelocation from 58-MX-10 ~o 65-S-10 ·~ I Date: 3/16/2010 DOE Code: -#Z'l?. Contractor Code: Project Lead: Everett Walker /41f-t#J ST _,J.tl Project Overview The Environmental Specialist and the Field Coordinator visited location and discussed the plan to remove 1. What are the environmental impacts? the WhisperGen unit, concrete pad, gas supply umbilical, and power conduit from the current location and move to higher visibility area with dry gas supply to supply power to 65-S-1 0. an existing well. There were 2 previous NEPAs # 211 on 5/27/09 and #240 on 10/01/09 2. What is the legal location? 58-MX-10 3. What is the duration of the project? Construction Two days/ Project Duration 6 months

159

ederal NEPA Contacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mr. Horst Greczmiel Mr. Horst Greczmiel Associate Director for NEPA Oversight 202-395-0827 DEPARTMENT OF AGRICULTURE Division: Name: Address: Phone/Email: Agriculture Research Service Mr. Charles L. Walthall National Program Leader, Office of National Programs, Natural Resources and Sustainable Agricultural Systems 5601 Sunnyside Ave. Beltsville, MD 20705-5140 301-504-4634 301-504-6231 (fax) charlie.walthall@ars.usda.gov Animal and Plant Health Inspection Service Elizabeth (Wendy) Nelson Environmental Protection Specialist 4700 River Road Unit 149 Riverdale, MD 20737 301-851-3089 elizabeth.e.nelson@aphis.usda.gov National Institute of Food and Agriculture (NIFA) Ms. Mary Ann Rozum Natural Resources and Environmental Unit 1400 Independence Ave, SW

160

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Project Information Project Title: Repair flowline at 83-AX-4 Date: 2-17-2010 DOE Code: Contractor Code: Project Lead: Bernard Winfrey Project Overview 1. What are the environmental Repair a flowline leak and test the line at 83-AX-4. Dug up pipeline, will backfill with clean fi ll dirt. Oil impacts? contaminated soil will be hauled to the east side landfarm and clean dirt will be brought in from section 20. 2. What is the legal location? 83-AX-4, N43 17'40.5" w. 10612'46.0" 3. What is the duration of the project? Approximately 2 days 4. What major equipment will be used if any (work over rig, drilling rig, Backhoe with operator and one to three workers. etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Project lnfonnation Project Title : NODA 1. Planned repair of flow lines Dat e : 8/41201 DOE Code : Contrac t o r Code: Project Lead: Michael J. Taylor [NCO] Project Ov erview NODA 1. Planned repair of flow lines : CX 8 5.4 1. Bnef project description [include anything that could impact the Note : For all 85.4 : Repair of pipeline sections falls under USACE environmenl] Nationwide Permit Number 12, Utility Line Activity. Non-emergency repairs that do NOT include reportable releases I spills. NOD required to ensure activities remain within existing right-of-ways (25' from centerline] and to determine if further analysis may be needed. The table below is to be completed by the Project Lea d a nd review ed by the Environmental Specialist a nd the DOE NEPA

162

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Project Information Project Title: T-6-10 abandoment and storage relocation Date: 912812009 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview We will be reclaiming this loc. we will dig down approx. 4ft. cut off pipes and cap them. And haul of dirt from the berms . We will then blade loc. . The worX to be done is to reclaim this location. In preparation for this 1. What are the environmental worX we will need to remove the old shipping building and a old set of tank stairs. These will be placed in storage in section 14. Upon reading SOP: EN.8000.01 reviewed on July 23rd 2009 I believe this falls under impacts? 2. What is the legal location? NEPA exclusion ex 81 .3 and CX 85.3. Which reads: When moving portable buildings to another disturbed

163

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

:;J/7 :;J/7 Project Information Project Title: B-1-3 Heat Trace Date: 10/14/09 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview Routine maintenance activities for the buildings at B-1-3 using existing electrical rights-of-way, to repair and replace electrical lines from the electrical box to the existing buildings. This is a routine 1. What are the environmental Maintenance activities, to preserve the electrical function in the buildings at B-1-3. impacts? 2. What is the legal location? 1 Day 3. What is the duration of the project? 4. What major equipment will be used Ditch witch I Backhoe if any (work over rig, drilling rig, etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

164

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Project lnfonnation Project Title: NODA 2. Reclamation of decommissioned Date: 8/4/2011 batteries, test satellites, and facilities DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview NODA 2. Reclamation of decommissioned batteries, test satellites, and 1. Brief project description [include facilities : anything that could impact the environment] ex 81 .3 and ex 86.1 Small-scale, short-term cleanup actions including excavation or consolidation of contaminated soils, removal of equipment and underground piping , drainage control, and reseeding. NOD req uired to ensure compliance with Reclamation Procedures. The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

165

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Project Information Project Title: Restoration "F T-3-3 Date: 1212/2009 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 1. What are the environmental The environmental impacts will be minimal since this is already disturbed land. The legal is T-3-3. We will be impacts? digging down 5ft. and cutting off pipe and capping them. We will then blade the area and till it The 2. What is the legal location? equipment to used is as follows: backhoe, blade, cutting torch,and a tiller. The duration of this project will be approx. 2 days. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below is to be completed by the Project Lead and reviewed by the Environmental Speciali.st and the DOE NEPA

166

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project lnfonnat ion Project Title: Geothermal Technologies Program - ORMAT Generator Date: 10-22-09 DOE Code: 6730.020.61041 Contractor Code: 8067-731 Project Lead: Lyle Johnson Project Overview 1. What are the environmental This NEPA is for the existing ORMAT geothermal processing unit that was used for testing during CRADA impacts? No 2007-083. The Original project consisted of the installation and 1 year testing of the binary geothermal power unit at the Tensleep battery using the hot produced water source as the heat medium. The unit is 2. What is the legal location? connected to the field electrical system for dissipation of the produced energy that is metered and monitored 3. What is the duration of the project? for reliability and quality. It is planned for the unit to remain in place so that an additional approximately 2.5

167

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Project lnfonnation Project Title: C-EA 7. Cleanup of "non-reportable" spills of crude Date: 8/4/2011 oil &/or produced water DOE Code: Contractor Code: Project Lead: Michael J. Taylor [NCO] Project Overview C-EA 7. Cleanup of "non-reportable" spills of crude oil &/or produced 1. Brief project description [include water : ex 85.4 and ex 85.6 anything that could impact the environment] Note : For all 85.4 : Repair of pipeline sections falls under USACE Nationwide Perm it Number 12, Utility Line Activity. For RMOTC's NEPA purposes, non-reportable spills of crude oil &/or produced water are less than one barrel that is NOT environmentally significant. Events that are environmentally significant include those that

168

Policy Standards, Guidance and Statutes  

Energy.gov (U.S. Department of Energy (DOE))

Policy Guidance and Statutes, DOE Standards, STD, Atomic Energy Act, Table, Draft DOE P, American Indian Religiuos Freedom, CERCLA, RCRA, Clean Air ACt, Clean Water Act, Emergency Planing and Community, Federal Environmental Laws, Surface Contamination Guidelines, DOE STD-1196-2011, Derived Concentration Technical Standard, ALARA, 0173T

169

Property:NEPA OtherDocuments | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:NEPA OtherDocuments Jump to: navigation, search Property Name NEPA OtherDocuments Property Type Page Description Additional supporting documents (e.g. biological assessment, cultural, completion reports, etc.) that don't fit any other upload category This is a property of type Page. It links to pages that use the form NEPA_Doc. Pages using the property "NEPA OtherDocuments" Showing 16 pages using this property. B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + Blue Mtn Appendix A WFO geo lease stips.pdf +, Blue Mountain AppendixC orig.pdf +, ROW Appendix D V02 (with cover).pdf + D DOI-BLM-NV-B020-2012-0214-EA + Silver Peak Draft EA Letter 20121011.pdf + DOI-BLM-NV-C010-2011-0514-EA + DOI-BLM-C010-2011-0514-EA-COAs.pdf +, DOI-BLM-C010-2011-0514-EA-Lease Stipulations.pdf +

170

Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA  

Energy.gov (U.S. Department of Energy (DOE))

This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina; (2) reporting oil and chemical spills; (3) projected long term recovery efforts; and (4) how agencies can respond to emergencies and comply with NEPA.

171

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1999 June 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 1999 June 1, 1999; Issue No. 19 continued on page 6 NEPA and Habitat Management Plan: Environmental Synergy By: Elizabeth Withers, NEPA Compliance Officer, Los Alamos Area Office, with John Stetson, Pacific Western Technologies, Ltd. On the day DOE issued the Draft EIS for the Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility at Los Alamos National Laboratory (LANL), LANL biologists discovered a nesting pair of Mexican spotted owls (Strix occidentalis lucida) – which had only recently been listed as threatened – in the canyons directly below the proposed site. Today, this nest site, at the edge

172

NEPA Documents | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Documents Documents NEPA Documents To see a list of available NEPA documents by type and sorted by publication date, click on the links below. Documents listed in this section are available to members of the public. To see documents not electronically available to the public see the Secure NEPA Documents page for more information. Categorical Exclusion (CX) Determinations Categorical exclusions are categories of actions that DOE has determined, by regulation, do not individually or cumulatively have a significant effect on the human environment and for which, therefore, neither an environmental assessment nor an environmental impact statement normally is required. DOE's categorical exclusions are listed in Appendices A and B to Subpart D of its NEPA regulations,10 CFR Part 1021.

173

Memorandum: Emergency Actions and NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2005 8, 2005 MEMORANDUM FOR FEDERAL NEPA CONTACTS FROM: HORST G. GRECZMIEL Associate Director for NEPA Oversight SUBJECT: Emergency Actions and NEPA This memorandum provides: * General information on the response to Katrina * Reporting oil and chemical spills * Projected long term recovery efforts * How agencies can respond to emergencies and comply with NEPA. Please distribute this memorandum to your agency planning and environmental personnel. General information on the response to Katrina: Information is available on the FEMA website at http://www.fema.gov and specifics on the government's response are provided at the "What Government is Doing" link which can be directly accessed at http://www.dhs.gov/dhspublic/interapp/editorial/editorial_0712.xml

174

NEPA-Related Public Involvement  

Energy.gov (U.S. Department of Energy (DOE))

The Loan Programs Offices NEPA-related hearings, public meetings, and public notices (e.g. public scoping meeting, public hearing, notice of proposed floodplain or wetland action) are presented...

175

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Project_!.!!formatlon Doll!r Reseed~ ~u.pment and Ol.mp lludts The table below Ia to be completed by the Project Lead and ,.vi-ed by the Envwonmental Spec1ull.r ao\d the DOll NEPA Compliance Officer. NOTE, If Ch *r :,r· ol .ir.Uf · OC" '" , PtOj

176

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Project Information Project T itle: Repair flowline 77 -S-1 0 Date: 3111/2010 DOE Code: Contractor Code: Project Lead: Wes Riesland Project Overview The flowline leak at 77 -s-1 0 surfaced on the location but we had to follow the line off the location to find the 1. What are the environmental impacts? hole in the pipe. This took us up the hill going south aproximatily 120 feet from the well head. We were able 2. What is the legal location? to successfully clamp the leak. 3. What is the duration of the projed? This flowline runs from the well 77 -s-1 0 to the B-2-1 0 manifold. 4. What major equipment will be used Approximately 6 hours to complete if any (worn over rig. drilling rig. etc.)? backhoe and opperator and one hand The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

177

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. NEPA COMPLIANCE SURVEY Project lnfonnation Project Title: Reclamation of Pits and Boxes Date: Nov. 3, 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview Reclamation of QD.]y the following Pits and Boxes : 1. Brief project description [include 1. B-2-1 0 Skim Box anything that could impact the 2. B-1-14 Skim Box environment 3. Near66-1-STX-14 Pit 2. Legal location 4. T-5-10 Skim Box 3. Duration of the project 5. WDFUpperPit 6. WDFLowerPit 4. Major equipment to be used 7. WDFSkimBox 8. B-1-3 Pit 9. B-1 -3 Skim Box 10. T-2-34 Pit 11 . B-1-10 Pit 12. B-1 -10 Skim Box 13. SE of SG3 & Welding Shop Skim Box 14. 58.Q4-1-SX-3 Skim Box 15. Near Tank 126 Skim Box 16. 77-1-SX-3 NW of Well Pit 17. T-5-3 Pit

178

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Log Deep Well Log Deep Well Date: 1/1212010 DOE Code: 6730.020.81019 Contractor Code: I 8067-756 Project Lead: Brian Black Project Overview This project will test prototype logg1 n_g tools 1 n a previously drilled deep well. The should not be any neglible 1. What are the environmental impacts? impacts to the environment. The tools will be lowered up and down a wellbore Via wireline cable and truck. 2. What is the legal location? This test will take place on the drilling rig at 45-3-X-21 3. What is the duration of the project? 4, What major equipment will be used The project will last for 3-4 days. if any (work over rig, drilling rig, etc.)? The drilling ng will be used as a overflead crane to lift the sheave pulley that the cable will run across. The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

179

NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Project lnfonnation Project Title: Repair flowline 100 feet North of 71-3-SX-3 Date: 2-16-2010 DOE Code: Contractor Code: Project Lead: Rick Mclaughlin Project Overview Emergency Repair tor a "owline leak north of 71-3-SX-3. Dug up pipeline, repaired line and backfilled with 1. What are the environmental impacts? clean fill dirt. Oil contaminated soH was hauled to the east side landfarm and dean dirt was brought in from section 20. 2 What 1s the legal location? 3. What is the duration of the project? North of 71-3-SX-3. N43 1 7'53 6~ W. 10611'49.3" 4. What major equipment will be used Approximately 4 hours if any (work over rig, drilling rig, etc.)? Backhoe with operator and one wor1NEPA

180

Pollution Prevention and NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Council on Environmental Quality AGENCY: Council on Environmental Quality, Executive Office of the President ACTION: Information only--Memorandum to Heads of Federal Departments and Agencies Regarding Pollution Prevention and the National Environmental Policy Act SUMMARY: This memorandum provides guidance to the federal agencies on incorporating pollution prevention principles, techniques, and mechanisms into their planning and decisionmaking processes and evaluating and reporting those efforts in documents prepared pursuant to the National Environmental Policy Act. FOR FURTHER INFORMATION CONTACT: Lucinda Low Swartz, Deputy General Counsel, Council on Environmental Quality, 722 Jackson Place, N.W., Washington, D.C. 20503. Telephone: 202/395-5754.

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - Showerhead Guidance _3-4__final_ _2_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Showerhead Enforcement Guidance Showerhead Enforcement Guidance Issued: March 4, 2011 On February 3, 2011, the Department of Energy withdrew from OMB review, as unwarranted, the draft interpretative rule setting out the Department's views on the definition of a "showerhead" under the Energy Policy Conservation Act (EPCA) - and we formally withdraw that draft interpretive rule from consideration today. Nevertheless, to provide certainty to all stakeholders, the Department has decided to issue this brief enforcement guidance setting forth how it intends to enforce the law enacted by Congress in 1992 - yet do so in way that avoids needless economic dislocation. * * * * * * * * * * * * * * * * * * * * * * * * * * * * In May 2010, the Department of Energy issued a draft interpretative rule on the definition

182

NEPA Cases Filed in 2010 2010 NEPA Case Dispositions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Filed in 2010 2010 NEPA Case Dispositions Filed in 2010 2010 NEPA Case Dispositions Lead Defendant Cases Filed Injunctions - Remands Judgment for defendant 46 ARMY-USACE 6 3 Dismissal w/o settlement 11 DHS-USCG 0 0 Settlement 8 DOD 1 0 Adverse dispositions: 17 DOE-Energy 0 0 TRO 0 DOE-FERC 0 0 Preliminary Injunction 5 DOE-NNSA 1 0 Permanent Injunction 4 DOI-BIA 1 0 Remand 8 DOI-BLM 17 5 DOI-BOEM 5 0 Basis for 2010 NEPA Dispositions DOI-BOR 0 0 Jurisdictional - P prevailed 0 DOI-FWS 6 1 Jurisdictional - D prevailed 12 DOI-OSM 0 1 NEPA - Not required 1 DOI-NPS 2 2 NEPA - Is required 2 DOJ 0 0 CE - Adequate 4 DOS 0 0 CE - Not Adequate 1 DOT-FAA 3 0 EA - Adequate* 11 DOT-FHWA 10 1 EA - Not Adequate* 5 DOT-FTA 2 0 EIS - Adequate* 17 EPA 1 0 EIS - Not Adequate* 5

183

Procedures for Submitting Documents for Posting on the DOE NEPA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Procedures for Submitting Documents for Posting on the DOE NEPA Website Procedures for Submitting Documents for Posting on the DOE NEPA Website The Electronic DOE NEPA document...

184

Guidance on Compliance with the National Environmental Policy Act for Corrective Actions Conducted under the Resource Conservation and Recovery Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

K9;07-w) K9;07-w) United State s Governme nt Department of Enerav memorandum DATE: REPLY TO AlT" OF: SUBJECT: TO: December 23, 1997 Office of NEPA Policy and Assistance:Osborne:202-586-4596 Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) NEPA Compliance Officers and Assistant Managers for Environmental Management I am pleased to provide the attached guidance on NEPA review for corrective actions under RCRA. This guidance results from the work of a Task Team formed by Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental

185

Federal Agency NEPA Implementing Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agency NEPA Implementing Procedures Agency NEPA Implementing Procedures Note: Some Departments' agencies have their own NEPA implementing procedures. To access Department-wide NEPA implementing procedures, click on the name of the Federal Department. To access NEPA implementing procedures for Department's agencies, click on the provided links. Department/ Agency: Division: Link: Department of Agriculture Agricultural Research Service http://www.ecfr.gov/cgi- in/text- idx?c=ecfr&SID=47c103e07fd64e933c7f74c 4b3c4ac9a&rgn=div5&view=text&node=7:6. 1 2 1 8&id 7 Animal and Plant Health Inspection Service http://www.ecfr.gov/cgi-bin/text- idx?c=ecfr&SID=47c103e07fd64e933c7f74c 4b3c4ac9a&rgn=div5&view=text&node=7:5. 1.1.1.21&idno=7 Farm Service Agency http://www.ecfr.gov/cgi-bin/text-

186

Technical Guidance  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Technical Guidance, within the Office of Health, Safety and Security develops and issues Government-wide and Department-wide technical guidance to ensure that classified nuclear...

187

Property:NEPA EA EIS Report | Open Energy Information  

Open Energy Info (EERE)

Report Report Jump to: navigation, search Property Name NEPA EA EIS Report Property Type Page Description EA/EIS Reports for NEPA Docs This is a property of type Page. Pages using the property "NEPA EA EIS Report" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + EA DOI-BLM-NV-WN-ES-08-01-1310 BlueMtn.pdf + C CA-017-05-051 + 6 - blm usfs and mono county 2005 basalt canyon ea-draft eir.pdf + CA-170-02-15 + EA CA-170-02-15.pdf + CA-96062042 + FourMile Hill EISEIR.pdf + D DOE-EA-1116 + EA-1116-FEA-1999.pdf + DOE-EA-1621 + EA-1621-FEA-2008.pdf + DOE-EA-1676 + EA-1676-FEA-2009.pdf + DOE-EA-1733 + EA-1733-FEA-2010.pdf + DOE-EA-1759 + EA-1759-EA-Final 2010.pdf + DOE-EA-1849 + EA-1849-FEA-2011.pdf +

188

Final Guidance for Consideration of Environmental Justice in Clean Air Act 309 Reviews  

Energy.gov (U.S. Department of Energy (DOE))

This Environmental Protection Agency document provides guidance on reviewing and commenting on other federal agencies NEPA documents to help ensure that environmental effects on minority and low-income communities have been fully analyzed.

189

Form:NEPA Doc | Open Energy Information  

Open Energy Info (EERE)

GEOTHERMAL ENERGY Input the name of a NEPA Document below. If the document already exists, you will be able to edit its information. AddEdit a NEPA Document Retrieved from...

190

NEPA Policy Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Policy Statement NEPA Policy Statement NEPA Policy Statement The NEPA process is a valuable planning tool and provides an opportunity to improve the Department of Energy decisions and build public trust. Reviews of the Department's NEPA program have shown that the Department must change the way it conducts its business to avoid unnecessary delays and reap the full benefits of the NEPA process. The Department must conduct the process as a team effort to make NEPA work better and cost less. The following new policies will streamline the NEPA process, minimize the cost and time for document preparation and review, emphasize teamwork, and make the process more useful to decision makers and the public. Except where specifically indicated otherwise, these policies are immediately effective.

191

Category:NEPA Properties | Open Energy Information  

Open Energy Info (EERE)

Properties Properties Jump to: navigation, search These are properties specific to NEPA (National Environmental Policy Act) Documents. Additional properties are used in the documents. Pages in category "NEPA Properties" The following 52 pages are in this category, out of 52 total. A Property:Applicant B Property:BLM CaseType C Property:CXReference D Property:DayQuantity E Property:EnergyTechnology Property:EnvironmentalAnalysisType F Property:FundingAgencies G Property:GeothermalDevelopmentPhases L Property:LeadAgency M Property:ManagingDistrictOffice Property:ManagingFieldOffice Property:MineralManager N Property:NEPA Application Property:NEPA Application Type Property:NEPA Application Url Property:NEPA ApplicationAttachments Property:NEPA ApplicationDate Property:NEPA CategoricalExclusion

192

CEQ NEPA & EMS Guide Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CEQ Publishes NEPA-EMS Guide CEQ Publishes NEPA-EMS Guide "The Council on Environmental Quality (CEQ) has published Aligning NEPA Processes with Environmental Management Systems - A Guide for NEPA and EMS Practitioner. This guide provides practitioners with a tool to improve NEPA implementation and achieve the environmental sustainability goals laid out in NEPA and Executive Order 13423: 'to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of present and future generations of Americans.'" James L. Connaughton Chairman, CEQ * CEQ's goal is to continue developing tools to improve and modernize NEPA. This Guide was developed help practitioners make NEPA implementation more effective and

193

Energy Sector Cybersecurity Framework Implementation Guidance- Notice of Public Comment: Federal Register Notice, Volume 79, No. 177, September 12, 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy invites public comment on a draft of the Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October 14, 2014.

194

NEPA Lessons Learned September 2011 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 1 The median cost and time to complete DOE environmental assessments (EAs) decreased substantially during 2009 and 2010, according to data collected by the Office of NEPA Policy and Compliance (NEPA Office), even though DOE's overall NEPA workload more than doubled during the same time period (Figures 1 and 2). The improved performance metrics are attributable to the preparation of

195

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

606: Draft Environmental Assessment 606: Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

196

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

197

NEPA Lessons Learned Quarterly Report June 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Second Quarter FY 2001 June 1, 2001; Issue No. 27 continued on page 3 The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, The DOE NEPA Compliance Officers will meet in Washington, DC, June 13 and 14, on the theme of “NEPA: What’s New, What’s Next.” Horst Greczmiel, CEQ’s Associate Director for NEPA Oversight, and Anne Miller, Acting Director of the EPA’s Office of Federal

198

NEPA Litigation Surveys | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Litigation Surveys NEPA Litigation Surveys NEPA Litigation Surveys CEQ publishes surveys on NEPA litigation on an annual basis. These surveys identify the number of cases involving a NEPA based cause of action, Federal agencies that were identified as a lead defendant, general information on plaintiffs, general information on why litigation was pursued, and the outcomes of the cases decided during the year. Each year, Federal agencies conduct hundreds of EISs, tens of thousands of EAs and hundreds of thousands of CEs. The amount of litigation on these NEPA analyses is comparatively small. Since 2001, fewer than 175 NEPA cases were filed each year - with less than 100 filed in 2007, 2009, 2010, and 2011. The annual surveys are provided below: 2011 Litigation Survey 2010 Litigation Survey

199

NEPA Litigation Surveys | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Litigation Surveys NEPA Litigation Surveys NEPA Litigation Surveys CEQ publishes surveys on NEPA litigation on an annual basis. These surveys identify the number of cases involving a NEPA based cause of action, Federal agencies that were identified as a lead defendant, general information on plaintiffs, general information on why litigation was pursued, and the outcomes of the cases decided during the year. Each year, Federal agencies conduct hundreds of EISs, tens of thousands of EAs and hundreds of thousands of CEs. The amount of litigation on these NEPA analyses is comparatively small. Since 2001, fewer than 175 NEPA cases were filed each year - with less than 100 filed in 2007, 2009, 2010, and 2011. The annual surveys are provided below: 2011 Litigation Survey 2010 Litigation Survey

200

DRAFT --DRAFT --DRAFT --DRAFT --DRAFT --Esodyp+: Prefetching in the Jackal Software DSM  

E-Print Network (OSTI)

DRAFT -- DRAFT -- DRAFT -- DRAFT -- DRAFT -- Esodyp+: Prefetching in the Jackal Software DSM-based Distributed Shared Memory (DSM) systems and discuss its implementation. In contrast to page-based DSMs, an object-based DSM distributes data on the level of objects, rendering current prefetchers for page

Genaud, Stéphane

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

202

2006 NEPA Survey.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Navy 1 0 Adverse dispositions: 120 NRC 3 1 TRO 1 DOI - BLM 21 14 Preliminary Injunction 8 - FWS 6 3 Permanent Injunction 16 - BuRec 0 1 Remand 48 - NPS 0 3 Dismissal w/ settlement 13 - BIA/NIGC 1 0 Dismissal w/o settlement 34 - MMS 0 0 Case pending, NEPA 195 - OSM 0 0 USDA - FS 30 33 - APHIS 2 1 DOC - NOAA 4 4 Army - COE 25 7 Gov't Agency Army 0 2 Jurisdictional - P prevailed 13 DOT - FHWA 7 1 Jurisdictional - D prevailed 14 - FTA 1 0 NEPA - Not required 4 - FAA 3 0 NEPA - Is required 0 - MARAD 0 0 CE - Adequate 9 - SLSC 0 0 CE - Not Adequate 4 DOE 0 1 EA - Adequate* 27 EPA 2 0 EA - Not Adequate* 23 HUD 0 0 EIS - Adequate* 29 Air Force 0 1 EIS - Not Adequate* 26 TVA 0 0 SEIS - Needed* 14 NSF 0 0 SEIS -Not Needed* 4 FCC 0 0 GSA 0 0 FDA 0 0 Total 108 72 27 Public Interest groups

203

Guidance Related to Analysis of Impacts to Workers in National Environmental Policy Act Documentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D A T E : June 10, 1988 REPLY TO ATTN OF: E H - 2 5 SUBJECT: Guidance Related to Analysis of Impacts to Workers in National Environmental Policy Act (NEPA) Documentation TO : D I S T R I BUT I ON The purpose of this memorandum is to provide general guidance regarding the analysis of impacts to workers in DOE environmental impact statements (EISs) and environmental assessments (EAs) in order to assist DOE program and field offices in meeting the requirements of NEPA and to establish a general consistency in the Department's NEPA documentation. This guidance was prompted by several questions raised in this regard and was developed by the Office of NEPA Project Assistance, after consultation with the Office of General Counsel. Background Neither the Council on Environmental Quality (CEQ) regulations for

204

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

205

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

206

Pollution Prevention Checklists for NEPA/309 Reviewers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention Checklists for NEPA/309 Reviewers Pollution Prevention Checklists for NEPA/309 Reviewers US Environmental Protection Agency Office of Federal Activities POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995 Prepared by SCIENCE APPLICATIONS INTERNATIONAL CORPORATION 7600-A LEESBURG PIKE FALLS CHURCH, VA 22043 EPA CONTRACT NO. 68-W2-0026 EPA WORK ASSIGNMENT NO. 33-II SAIC PROJECT NO. 01-1030-07-1605-000 Table of Contents 1.0 INTRODUCTION 1.1 What Is Pollution Prevention? 1.2 Why Practice Pollution Prevention? 2.0 INCORPORATING POLLUTION PREVENTION INTO NEPA 3.0 POLLUTION PREVENTION/ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA REVIEWERS q Checklist for Energy Management file:///D|/40369.010_EPA%20NEPA%20CD/Old/HTML/Pollprev.htm (1 of 10) [9/11/2002 2:19:58 PM]

207

Secure NEPA Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secure NEPA Documents Secure NEPA Documents Secure NEPA Documents The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information these documents may contain. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. Requesting Secure NEPA Documents You may request copies of documents by e-mail or by leaving a message on our toll-free information line at 1-800-472-2756. Please provide the following information in your request: Title and Number of Document requested First Name: Last Name: Address: City: State: Zip Code: Organization (If Applicable): E-mail: Phone: List of Secure NEPA Documents April 1, 2007 EIS-0376: Final Environmental Impact Statement

208

Secure NEPA Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secure NEPA Documents Secure NEPA Documents Secure NEPA Documents The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information these documents may contain. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. Requesting Secure NEPA Documents You may request copies of documents by e-mail or by leaving a message on our toll-free information line at 1-800-472-2756. Please provide the following information in your request: Title and Number of Document requested First Name: Last Name: Address: City: State: Zip Code: Organization (If Applicable): E-mail: Phone: List of Secure NEPA Documents May 1, 1984 EIS-0108: Final Environmental Impact Statement

209

Transmission/Nepa Database | Open Energy Information  

Open Energy Info (EERE)

Nepa Database Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Document Collections (1) Have a NEPA Document Collection to add that doesn't yet exist in this collection? Make sure it doesn't already exist: Please be sure to search this page by serial number and by document number Add.png Add a new NEPA Document Collection This query has been included to allow you to use the black arrows in the table header cells to sort the table data. Document Name Serial Number Analysis Type Transmission Type Project Area Applicant Lead Agency District Office Project Phase(s) TransWest EIS 600kV Wyoming Western Power Administration BLM BLM Wyoming State Office

210

EPA: Consideration of Cumulative Impacts in EPA Review of NEPA Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consideration Of Cumulative Impacts In EPA Review of Consideration Of Cumulative Impacts In EPA Review of NEPA Documents U.S. Environmental Protection Agency, Office of Federal Activities (2252A) EPA 315-R-99-002/May 1999 1. INTRODUCTION The combined, incremental effects of human activity, referred to as cumulative impacts, pose a serious threat to the environment. While they may be insignificant by themselves, cumulative impacts accumulate over time, from one or more sources, and can result in the degradation of important resources. Because federal projects cause or are affected by cumulative impacts, this type of impact must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The purpose of this guidance is to assist EPA reviewers of NEPA documents in providing accurate, realistic, and consistent

211

NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

and NHPA: A Handbook for Integrating NEPA and Section 106 and NHPA: A Handbook for Integrating NEPA and Section 106 NEPA and NHPA: A Handbook for Integrating NEPA and Section 106 In this document the Council on Environmental Quality and the Advisory Council on Historic Preservation (ACHP) provide advice to Federal agencies, applicants, project sponsors, and consultants on how to take advantage of existing regulatory provisions to align the NEPA process and the National Historic Preservation Act (NHPA) Section 106 review process. Federal agencies have independent statutory obligations under NEPA and NHPA. The handbook and a joint letter from CEQ and ACHP are available for download here. G-CEQ-NEPA_NHPA_Section_106_Handbook_Mar2013.pdf CEQ_ACHP_LTR_NEPA_NHPA_Handbook_MAR2013.pdf More Documents & Publications

212

NEPA Lessons Learned Second Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 (continued on page 4) Second Quarter FY 2006 June 1, 2006; Issue No. 47 National Environmental Policy Act U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT LESSONS LEARNED LEARNED LESSONS N E P A Quality + Leadership = NEPA Success NEPA 35 Earns Special Award from NAEP; see page 3 DOE's NEPA Compliance Offi cers discussed quality assurance during the interactive meeting of more than

213

NEPA Lessons Learned June 2010 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 1 10 1 Second Quarter FY 2010 June 1, 2010; Issue No. 63 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A To mark the 40 th anniversary of NEPA, the Office of NEPA Policy and Compliance is inviting distinguished NEPA practitioners to share their thoughts on the occasion. In this issue, Anne Norton Miller, former Director of the Office of

214

NEPA Lessons Learned September 2010 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 1 0 1 The Council on Environmental Quality (CEQ) recently issued its report on the NEPA process related to drilling of the Macondo well, which was the source of the April 20, 2010, accident and subsequent oil spill in the Gulf of Mexico. The report contains useful reminders to all NEPA practitioners of the importance of transparency and accountability in the NEPA process. It

215

DOE-NEPA-Document-CertificationandTransmittalFormAugust2012.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Policy and Compliance August 2012 NEPA Policy and Compliance August 2012 DOE NEPA Document Certification and Transmittal Form 1. NEPA Document #:_____________________________(e.g., DOE/EIS-XXX, DOE/EA-XXXX) Document date:_____________________________________________________________ Title:______________________________________________________________________ __________________________________________________________________________ 2. NEPA Document Keywords: Keyword 1:___________________________ Keyword 2:____________________________ Keyword 3:___________________________ Keyword 4:____________________________ Keyword 5:___________________________ Keyword 6:____________________________ 3. Contact Information: Organization:_______________________________________________________________________

216

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

217

DOE NEPA Compliance Officers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. NCODirectory100214.pdf More Documents &...

218

Draft Energy Sector Cybersecurity Framework Implementation Guidance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Technology (NIST) released a Cybersecurity Framework. DOE has collaborated with private sector stakeholders through the Electricity Subsector Coordinating Council (ESCC)...

219

SGIG Reporting Guidance Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SGIG Reporting SGIG Reporting Guidance Archive SGIG Reporting Guidance Archive July 22, 2010-- Federal Register Notice on the DOE's invitation for public comment on request to the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE has submitted to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before August 21, 2010. More> Public comments on OE's Emergency Information Collection Request Support Statement and draft Smart Grid Grant Program reporting guidance. OE's response to public comments on its Emergency Information Collection Request Support Statement and draft Smart Grid Grant Program reporting

220

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Smart Grid Grant Program Recipient Reporting Guidance | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Grant Program Recipient Reporting Guidance Smart Grid Grant Program Recipient Reporting Guidance Smart Grid Grant Program Recipient Reporting Guidance Draft reporting guidance for the Smart Grid Investment Grant project under the American Recovery and Reinvestment Act. Submitted to Office of Management and Budget (OMB) for approval and subject to revision. Includes guidance on DOE corporate reporting, Project Management Value System (PVMS) reporting, risk management reporting, and DOE jobs reporting guidance. Smart Grid Grant Program Recipient Reporting Guidance More Documents & Publications Smart Grid Grant Program Recipient Reporting Guidance, Updated Questions and Answers for the Smart Grid Investment Grant Program: Reporting of Jobs Created/Retained in SIPRIS Questions and Answers for the Smart Grid Investment Grant Program:

222

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

223

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

224

NEPA Lessons Learned Quarterly Report, Issue No. 41; Fourth Quarter FY 2004; December 1, 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 1 4 1 The EIS Comment-Response Process Guidance Issued; see page 9 Putting the Web to Work for NEPA National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2004 December 1, 2004; Issue No. 41 LESSONS LEARNED LEARNED LESSONS (continued on page 4) "What's your e-mail address? Do you have a Web site?" These are common questions in

225

NEPA Lessons Learned Third Quarter FY 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 1 6 1 a Geologic Repository at Yucca Mountain, Nye County, Nevada (Rail Alignment EIS, in preparation). Other elements of the court order also are of general interest to NEPA practitioners, including those related to the "hard look" standard, expressions of an agency's preferred alternative, and the need for potential plaintiffs to raise concerns during the NEPA process.

226

NEPA Lessons Learned Cumulative Index December 2012 1 DOE NEPA Lessons Learned Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cumulative Index December 2012 1 Cumulative Index December 2012 1 DOE NEPA Lessons Learned Quarterly Report A Accident Analyses Sep 95/12; Dec 95/15; Sep 97/7; Sep 98/7; Dec 98/5; Jun 00/3, 8 guidance issued for preparation of Sep 02/16; Dec 02/20 Adaptive Management also see: Environmental Management Systems Dec 02/8; Jun 07/17; Jun 08/8 training Dec 06/16 Administrative Record also see: Legal Issues Mar 97/13; Sep 97/7; Jun 98/7; Dec 98/4 Advisory Council on Historic Preservation also see: National Historic Preservation Act Dec 98/11; Jun 99/3; Sep 99/2; Dec 00/6; Jun 01/8; Dec 01/6; Sep 02/17; Dec 03/13; Sep 04/16 Affected Environment Sep 95/12; Dec 98/7; Sep 00/8 Air Force Sep 11/10 Alternative Arrangements (emergency actions) see: Council on Environmental Quality: alternative arrangements

227

NEPA Database | OpenEI Community  

Open Energy Info (EERE)

NEPA Database NEPA Database Home > Groups > Geothermal Regulatory Roadmap Kyoung's picture Submitted by Kyoung(155) Contributor 25 February, 2013 - 10:19 data NEPA quarterly meeting We are in the process of working with federal agencies (DOE, BLM, USFS) and their local offices to collect detailed information about Geothermal NEPA documents, including applications that triggered the documents, relevant dates, agencies, stipulations, conditions and mitigation measures. The collection of these data will allow us to analyze (with real data) NEPA timelines and processes. These data will be posted on OpenEI after they are collected. We plan to present the preliminary results of this work at our next quarterly meeting in April for public feedback and comment. Groups: Geothermal Regulatory Roadmap

228

NEPA Reading Room | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Reading Room | National Nuclear Security Administration Reading Room | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog NEPA Reading Room Home > About Us > Our Operations > NNSA Office of General Counsel > National Environmental Policy Act (NEPA) > NEPA Reading Room NEPA Reading Room Welcome to the National Nuclear Security Administration's NEPA Reading

229

ARRA Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GUIDANCE FOR MODIFICATIONS GUIDANCE FOR MODIFICATIONS AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) This guidance is for contracting officers who are obligating ARRA funds on existing contracts. 1. All contracts obligating ARRA funds shall include the applicable contract language referenced in Flash 2009-28 if this language has not already been added to the subject instrument. The modification incorporating the ARRA unique terms and conditions must be added by a bilateral modification to the contract. 2. ARRA funding has unique tracking and reporting requirements. The Recovery Act funds must remain segregable from obligation through costing and disbursement. Recovery Act funds must be disbursed by September 30, 2015. Contracting Officers should so notify their impacted contractors.

230

POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

9 Guidance on Transition to Eliminate FCIP (Expired) POLICY GUIDANCE MEMORANDUM 19 Guidance on Transition to Eliminate FCIP (Expired) THIS GUIDANCE HAS EXPIRED Guidance on the...

231

NEPA Process for Geothermal Power Plants in the Deschutes National...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NEPA Process for Geothermal Power Plants in the Deschutes National Forest EIS at Newberry...

232

Template for Expedited National Environmental Policy Act (NEPA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Environmental Policy Act (NEPA) Review of Certain State Energy Program Projects Template for Expedited National Environmental Policy Act (NEPA) Review of Certain State...

233

DOE Annual NEPA Planning Summary report templates 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration Project" "Annual NEPA Planning Summary " "Mitigation Action Plan (MAP) Tracking" "West Valley Demonstration Project" "applicationvnd.ms-excel" "NEPA Document...

234

Microsoft Word - NEPA Fact Sheet Oct 17 2011  

National Nuclear Security Administration (NNSA)

NEPA process does not dictate that an agency select the most environmentally beneficial alternative. The purpose of the NEPA process is to ensure that accurate environmental...

235

Guidance: Incorporating EPA's Pollution Prevention Strategy into Environmental Reviews  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$'1 $'1 f%'1OIR A N Iv { JM ............................................... EiW'KRO>31ENTAL PROTECTIOX AGENCY OFF~E C)F FEI)ERAL ACTIVITIES Guidance on Incorporating EPA's Pollution Prevention Strategy ,' into EPA's Environmental Revielv Process The Office of Federal Activities (OFA) is issuing guidance which incorporates the Environmental Protection Agency (EPA) Pollution Prevention Strategy into the Agency's National Environmental Policy Act (NEPA) and Section 309 of the Clean Air Act review processes. Prevention To implement thePollution Act of 1990, this guidance focuses primarily upon influencing federal agencies' policies, practices, and regulatory functions to incorporate pollution prevention into their planning and decision-making. IMckzround

236

Guidance on EIS Review and Recovery Act Loan Guarantee Applications |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on EIS Review and Recovery Act Loan Guarantee Applications Guidance on EIS Review and Recovery Act Loan Guarantee Applications Guidance on EIS Review and Recovery Act Loan Guarantee Applications June 8, 2010 - 2:22pm Addthis DOE must complete NEPA review before it may provide financial assistance in the form of loan guarantees. Projects seeking such assistance under Section 1705 of Title XVII of the Energy Policy Act of 2005, 22 U.S.C. 16511-16514, must commence construction no later than September 30, 2011. Because many of DOE's Environmental Impact Statements (EISs) take 18-24 months to complete, the Department has previously notified applicants that DOE, "will be unlikely to complete the NEPA process" for a project requiring an EIS in sufficient time to make an award. This statement has led to questions whether there are any circumstances under which DOE may be

237

Determining when NEPA applies to nonfederal activities  

SciTech Connect

More than a quarter century after enactment of the National Environmental Policy Act (NEPA), unresolved questions still persist regarding its applicability to state and private actions. This is particularly true when such projects are undertaken to support the needs of a federal agency. Proposed below is a paradigm for determining when NEPA applies to state or privately conducted, but federally influenced or inspired, actions. The paradigm employs a set of five sequential tests for determining if a state or privately conducted action is subject to the requirements of NEPA.

Eccleston, C.H., Westinghouse Hanford

1996-07-03T23:59:59.000Z

238

Recipient: County of Howard, MD ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Recipient: County of Howard, MD ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Electric Pick-up truck for on- site use at Alpha Ridge Landfill B5.1 None Landfill Forced Draft Heater A9 This CX applies to preliminary engineering and design tasks only. Additional information is required to make a NEPA determination for construction and operation tasks. Diesel Hybrid Truck B5.1 None Home Energy Audits A9 None Park Ballfield Lights Energy Efficiency B5.1 Waste Stream Clause Energy Efficiency Analysis via Monitoring of Sub-Meters Installation B5.1 None Energy Management Consultant A9 None High Efficiency Lighting - Rec & Parks B5.1

239

DOE NEPA Rulemaking | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE NEPA Rulemaking DOE NEPA Rulemaking DOE NEPA Rulemaking Revisions to U.S. Department of Energy (DOE) regulations regarding implementation of the National Environmental Policy Act (NEPA) became effective on November 14, 2011. DOE has established 20 new categorical exclusions, most of which include criteria (e.g., acreage, location, and height limitations) that limit the covered actions. These categorical exclusions address actions such as stormwater runoff control, alternative fuel vehicle fueling stations and electric vehicle charging stations, and small-scale renewable energy projects. DOE also has revised many existing categorical exclusions and made other changes. Final Rule Notice of Final Rulemaking (76 FR 63763; October 13, 2011) Final rule, 10 CFR Part 1021, with changes tracked from the previous rule.

240

Integrating Pollution Prevention with NEPA Planning Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: REPLY TO ATTN OF: SUBJECT: TO: October 15, 1992 EH-25 Integrating Pollution Prevention with NEPA Planning Activities NEPA Compliance Officers The purpose of this memorandum is to advise you of the direction that the Environmental Protection Agency (EPA) and Council on Environmental Quality (CEQ) appear to be taking regarding pollution prevention and NEPA, and to encourage you to use the NEPA process to incorporate pollution prevention principles into the DOE planning and decisionmaking process. The Pollution Prevention Act of 1990 affirms Congressional commitment to a new approach in improving environmental quality. The Act establishes as national policy the following hierarchy of actions for environmental protection: 1. prevent or reduce pollution at the source wherever

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Active NEPA Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Active NEPA Projects Active NEPA Projects Active NEPA Projects List of Active NEPA Projects EIS-0497: CE FLNG Project, Plaquemines Parish, Louisiana The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal in Plaquemines Parish, Louisiana, and approximately 37 miles of 42-inch diameter natural gas transmission pipeline to connect the terminal to natural gas infrastructure facilities. Last Update: January 8, 2014 EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Milton-Freewater, Oregon, and Dayton, Washington Bonneville Power Administration (BPA) is preparing an EIS to analyze the potential environmental impacts of funding a proposal by the Confederated

242

Environmental Justice: Guidance Under the National Environmental Policy Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cover photograph of John Heinz National Wildlife Refuge at Tinicum cover photograph of John Heinz National Wildlife Refuge at Tinicum by John and Karen Hollingsworth Front cover photograph of school bus and children by Sam Kittner. ENVIRONMENTAL JUSTICE Guidance Under the National Environmental Policy Act Council on Environmental Quality Executive Office of the President Old Executive Office Building, Room 360 Washington, D.C. 20502 (202)395-5750 http://www.whitehouse.gov/CEQ/ December 10, 1997 Table of Contents I. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. Executive Order 12898 and the Presidential Memorandum . . . . . . . . . 3 III. Executive Order 12898 and NEPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. NEPA Generally . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

243

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities: Environmental Assessments"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of Ongoing NEPA Compliance Activities: Environmental Assessments" Status of Ongoing NEPA Compliance Activities: Environmental Assessments" "NNSA NA-21" "January 2012" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"U.S.-origin Spent Nuclear Fuel Returned to the United States from Austria in 2025",250000,"Determination Date:","February 2012","NA-21 seeks to analyze the impacts of U.S.-origin spent nuclear fuel returned to the United States from Austria in 2025 since current NEPA documentation for the U.S.-Origin Remove Program does not address this scenario." ,,,"Transmittal to State:","March 2012"

244

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEPTEMBER 1998 1 SEPTEMBER 1998 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT DOE NEPA Community to Meet in October For Third Quarter FY 1998 September 1, 1998, Issue No. 16 On October 14 and 15, 1998, the DOE NEPA Community will meet in North Las Vegas, hosted by the Nevada Operations Office at its new Support Facility. The Office of NEPA Policy and Assistance is sponsoring this meeting to improve DOE NEPA performance through sharing of lessons learned and discussion of current issues. Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process Managing the NEPA Process The meeting will focus on issues that NEPA Document Managers face daily: What tools and techniques can help

245

NEPA Success Stories and Benefits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Success Stories and Benefits NEPA Success Stories and Benefits NEPA Success Stories and Benefits September 16, 2013 Examples of Benefits from the NEPA process for ARRA funded activities Efforts to implement the American Recovery and Reinvestment Act of 2009 (ARRA) include ensuring, and reporting on, timely NEPA reviews prepared in support of projects and activities funded under major provisions of ARRA. In addition to reporting on the status of the NEPA environmental reviews, agencies also report on the benefits of NEPA. September 16, 2013 NEPA Success Stories: Celebrating 40 Years of Transparency and Open Government NEPA Success Stories: Celebrating 40 Years of Transparency and Open Government, Environmental Law Institute, 2010. February 27, 2013 NEPA Success Stories from Lessons Learned Quarterly Reports

246

NEPA Lessons Learned March 2012 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 1 2 1 Frequent communication between senior program managers and NEPA staff, as well as close coordination among all involved DOE offices, enabled the Office of Energy Efficiency and Renewable Energy (EERE) to meet the challenge of completing an unprecedented number of NEPA reviews in recent years. From 2009 through 2011, EERE distributed approximately $16.8 billion from the American Recovery and Reinvestment Act of 2009

247

Final Guidance on Improving the Process for Preparing Efficient and Timely  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Improving the Process for Preparing Efficient and on Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act Final Guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act The Council on Environmental Quality is issuing its final guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews under the National Environmental Policy Act. The National Environmental Policy Act (NEPA) and CEQ Regulations implementing NEPA provide numerous techniques for preparing efficient and timely environmental reviews. CEQ is issuing this guidance for Federal departments and agencies to emphasize and clarify that these techniques are available for all NEPA Environmental Assessments and Environmental Impact Statements.

248

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

249

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

250

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

251

Additional Guidance Regarding Application of Current Procedures for Testing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Additional Guidance Regarding Application of Current Procedures for Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010. Draft of DOE interpretive rule, which sets out DOE's views on the clothes washer testing procedure described in 10 CFR § 430 Appendix J1, having to do with how to apply the testing procedures to washers with a warm rinse option. This draft interpretive rule represents DOE's interpretation of

252

Attachment G: Guidance on Headquarters Approval of State  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

G: Guidance on Headquarters Approval of State G: Guidance on Headquarters Approval of State Agreements-in-Principle Attachment G: Guidance on Headquarters Approval of State Agreements-in-Principle Guidance on Headquarters Approval of State Agreements-in-Principle Introduction: In December 1993, the Office of Environmental Management (EM) informed states that the Department intended to extend the existing Agreements-in-Principle (AIPs) for another five-year term and would continue to negotiate new AIPs. The purpose of this memorandum is to provide guidance on Headquarters approval of State AIPs in the EM program. This guidance applies to both new and renegotiated AIPs. All Operations and Field Offices are directed to involve appropriate Headquarters organizations early in the negotiations to assure that draft agreements

253

NEPA Lessons Learned Quarterly Report Questionnaire | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire NEPA Lessons Learned Quarterly Report Questionnaire This questionnaire is used to collect information from the Department of Energy (DOE) National Environmental Policy Act (NEPA) Community. In accordance with DOE Order 451.1B, NEPA Compliance Program, NEPA Document Managers and NEPA Compliance Officers should fill out a questionnaire (separately or jointly) as soon as possible after completing each environmental impact statement (EIS) and environmental assessment (EA). Questionaires also may be returned earlier, at any time during the NEPA process, to share valuable lessons learned with others. Other document preparation team members also are encouraged to submit a questionnaire. Information provided through this questionaire helps the Office of NEPA

254

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE's power marketing activities, based on DOE's experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time, while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. 61 Fed Reg 64603: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222)

255

Microsoft Word - PeerReview_SAR.doc | Department of Energy  

Energy Savers (EERE)

- PeerReviewCCSP.doc Microsoft Word - Cross Reference Matrix Introduction.doc DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions...

256

EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

!, !, u.s. DEPARThIENT OFENI'RGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT :Advanced Magnet Lab, Inc. STATE : FL PROJECf TITLE: A Lightweight, Direct Drive, Fully Superconducting Generator for large Wind Turbines Page 1 of3 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000439 DE-EEOOOS140 GFO-OOOS140-003 G05140 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under OOE Order 451.1A), I have made the following determination : ex. EA, EIS APPENDIX AND NUMBER: Description: 83.6 Small-scale research and de ve lopment, labo ratory o perations, and pilot projects Siting. construction, modification, operation. and decommiSSioning of facilities for smaliscale research

257

Property:NEPA Application | Open Energy Information  

Open Energy Info (EERE)

Application Application Jump to: navigation, search Property Name NEPA Application Property Type Page Description NEPA application files. All NOIs. Drilling permits are also appropriate. This is a property of type Page. Pages using the property "NEPA Application" Showing 25 pages using this property. (previous 25) (next 25) D DOI-BLM-NV-C010-2009-0030-CX + 87401 - NOI.pdf +, 87402 - NOI.pdf +, 87400 - NOI.pdf +, ... DOI-BLM-NV-C010-2009-0051-CX + 88819 - NOI - 2009-09.pdf + DOI-BLM-NV-C010-2010-0008-CX + 88211 - NOI.pdf + DOI-BLM-NV-CO1000-2010-0009-CX + NVN-088209-NOI.pdf +, NVN-088209 - NOI(a).pdf +, NVN-088212-NOI.pdf + DOI-BLM-NV-CO1000-2010-0010-CX + 88210 - NOI.pdf + DOI-BLM-NV-CO1000-2010-0011-CX + NVN-088209-NOI.pdf +, NVN-088209 - NOI(a).pdf +

258

NEPA Yucca Mountain Downloads | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Yucca Mountain Downloads NEPA Yucca Mountain Downloads NEPA Yucca Mountain Downloads October 24, 2008 EIS-0250: Notice of Intent to Prepare a Supplement to the Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-level Radioactive Waste at Yucca Mountain, Nye County, Nevada October 10, 2008 EIS-0369: Floodplain Statement of Finding Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada October 10, 2008 EIS-0369: Record of Decision and Floodplain Statement of Findings Nevada Rail Alignment for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada June 2, 2008 EIS-0250-S2: Final Supplemental Environmental Impact Statement

259

NEPA-106 26feb13.pub  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O O U N C I L O N E N V I R O N M E N T A L Q U A L I T Y E X E C U T I V E O F F I C E O F T H E P R E S I D E N T A N D A D V I S O R Y C O U N C I L O N H I S T O R I C P R E S E R V A T I O N NEPA and NHPA A Handbook for Integrating NEPA and Section 106 M A RC H 2 0 1 3 C O U N C I L O N E N V I R O N M E N T A L Q U A L I T Y E X E C U T I V E O F F I C E O F T H E P R E S I D E N T A N D A D V I S O R Y C O U N C I L O N H I S T O R I C P R E S E R V A T I O N NEPA and NHPA A Handbook for Integrating NEPA and Section 106 M A RC H 2 0 1 3 NEPA and NHPA │ 3 │ March 2013 TABLE OF CONTENTS I. Introduction ................................................................................................................................... 4 II. Background ..................................................................................................................................... 6 III. Relationship Between Section 106 and NEPA ...................................................................... 10

260

First draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group By The Regulatory Assistance Project Bob Anderson Associate Draft January 15, 2004 Transmission Planning: Institutional Issues in the West Page i Table of Contents Introduction......................................................................................................................... 1 Background-The Existing Transmission Planning Landscape......................................... 3 Interconnection-wide Transmission Planning ................................................................ 3 Seams Steering Group-Western Interconnection (SSG-WI) ...................................... 3 Western Electricity Coordinating Council (WECC)...................................................

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

NEPA Success Stories from Lessons Learned Quarterly Reports | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports NEPA Success Stories from Lessons Learned Quarterly Reports This document contains a compilation of NEPA "success stories" that were featured in DOE Lessons Learned Quarterly Reports (LLQRs). Feature articles in LLQR have described how the NEPA process provided an organized structure for making some of the Department's most complex decisions. NEPA reviews have resulted in significant project cost savings through informed decision making. Some articles have highlighted ways in which the NEPA process improved environmental outcomes, such as by identifying better alternatives or more effective mitigation. Some articles have put the spotlight on procedural success, such as effective public

262

Designating and Supporting NEPA Document Managers (November 24, 1998)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UUI= UUI= f- 1;;2b.~ (08-93) United States Government Department of Energy memorandum DATE:November 24, 1998 RA~~Y 6~ Office ofNEPA Policy and Assistance:Daniel:6-9760 SUBJECT: Designating and Supporting NEPA Document Managers TO: Secretarial Officersand Heads ofField Organizations The purpose of this memorandumis to emphasizeto you the important role your National EnvironmentalPolicy Act (NEPA) Document Managers play in the success of the Department's NEPA compliance program and to help you maximizetheir effectiveness. The NEPA Document Manager position was establishedto improve the management of the NEPA process by promoting team leadership and ownership at the staff level. The position was created four years ago through the SecretarialPolicy Statement on NEPA (June 1994), and now is incorporated in DOE Order 451.1A, NEPA ComplianceProgram. As you know, Secretarial

263

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1994  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LESSONS LEARNED QUARTERLY REPORT 4TH QUARTER FY1994 Oflicx of NEPA Oversight U.S. Department of Energy December ~ 1994 INTRODUCTION . To fdster continuing improvementof the Department's National Environmental policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEP& issued June 13, 1994, requires the OffIceof Environment StUetyand Health to soiicit comments tkom the NEPA Document Manager, the NEPA Compliance Offker, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the proces~ and to distribute a -Y SUmmW tOall NEpA Gmplf-c Offfcem and NEPA Document Managem On August Q 1994 the Oftice of NEPA Oversight distributed an interhddraft kSSOI.W ]WImed questionnaire to NEPA contacts to be used for reporting on environmental impact statements and environmental assessments approvedbetween

264

Promoting NEPA Transparency and Public Engagement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Promoting NEPA Transparency and Public Engagement Promoting NEPA Transparency and Public Engagement Promoting NEPA Transparency and Public Engagement June 3, 2011 - 1:14pm Addthis "NEPA is, at its core, a transparency statute," said Katie Scharf, Council on Environmental Quality (CEQ) Deputy General Counsel, in opening a panel discussion on using information technology to support open government initiatives, engage the public, and add value to NEPA analysis. At the March 9, 2011, event - hosted by CEQ for Federal NEPA and legal staff - speakers promoted the benefits of enhancing transparency and offered practical implementation advice. Ms. Scharf asked the speakers to address why transparency is essential to the NEPA process and describe innovative approaches and achievements. NEPA's value, especially with regard to EISs, is based on transparency,

265

Bureau of Land Management - NEPA Website | Open Energy Information  

Open Energy Info (EERE)

Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - NEPA Website Abstract This page links to the BLM NEPA website....

266

Bureau of Land Management - NEPA Web Guide | Open Energy Information  

Open Energy Info (EERE)

Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - NEPA Web Guide Abstract The NEPA Web Guide includes links to official...

267

Geothermal NEPA Workshop at GRC | OpenEI Community  

Open Energy Info (EERE)

Geothermal NEPA Workshop at GRC Geothermal NEPA Workshop at GRC Home > Groups > Geothermal Regulatory Roadmap Kyoung's picture Submitted by Kyoung(155) Contributor 14 October, 2013 - 20:19 Categorical Exclusions CX Database EA EIS FONSI GEA GRC GRR NEPA On Tuesday, October 2, the Geothermal Technology Office and the National Renewable Energy Laboratory held a 1/2-day NEPA workshop. The workshop was held at the MGM Grand in Las Vegas, in conjunction with the GEA/GRC Tradeshow and Conference. Three presentations were given, describing the NEPA database and associated analysis that had been conducted in 2013. 1. NEPA Database: The NEPA Database was developed on OpenEI as a way to assemble NEPA-related documents and meta-data in one location. As of this posting, there are 175 document sets in the collection, including

268

The Department of Energy Releases Draft of Cybersecurity Risk Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy Releases Draft of Cybersecurity Risk The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) September 12, 2011 - 10:05am Addthis Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities Better Understand and Assess Cybersecurity Risk WASHINGTON, DC - The Department of Energy, in collaboration with the National Institute of Standards and Technology and the North American Electric Reliability Corporation, has released a draft of the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline for public comment. The RMP Guideline was drafted by a joint public-private sector

269

The Department of Energy Releases Draft of Cybersecurity Risk Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy Releases Draft of Cybersecurity Risk The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities Better Understand and Assess Cybersecurity Risk WASHINGTON, DC - The Department of Energy, in collaboration with the National Institute of Standards and Technology and the North American Electric Reliability Corporation, has released a draft of the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline for public comment. The RMP Guideline was drafted by a joint public-private sector team that also included representatives from the Federal Energy Regulatory

270

DOE Annual NEPA Planning Summary report templates 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

or Field Organization " "Annual NEPA Planning Summary " "Mitigation Action Plan (MAP) Tracking" "National Nuclear Security Administration - Nevada Site Office" "application...

271

Category:NEPA Doc | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Category Edit History Facebook icon Twitter icon » Category:NEPA Doc Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Category: NEPA Documents Collections Add.png Add a new NEPA Document Collection Pages in category "NEPA Doc" The following 178 pages are in this category, out of 178 total. B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 C CA-017-05-051 CA-067-2006-12 CA-170-02-15 CA-650-2005-086 CA-670-2010-107 CA-670-2010-CX CA-96062042 D DOE-EA-1116 DOE-EA-1621 DOE-EA-1676 DOE-EA-1733 DOE-EA-1759 DOE-EA-1849 DOE-EA-1961 DOE-EIS-0298 DOI-BLM-CA-C050-2009-0005-EA DOI-BLM-CA-EA-2002-??? DOI-BLM-CA-ES-2007-017-3200 DOI-BLM-CA-ES-2013-002+1793-EIS

272

NEPA Lessons Learned December 2011 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 1 The Department of Energy (DOE) has revised its National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR Part 1021) to better align them with current DOE missions and improve the efficiency and transparency of its environmental reviews. The revisions focus on the categorical exclusion provisions. Since DOE last revised its categorical exclusions 15 years

273

NEPA Lessons Learned Quarterly Report. December 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 1 5 1 More Inside on NEPA 35 CEQ Chairman Connaughton's Address ......... 5 Plenary Sessions.............................................. 6 Training Sessions .......................................... 14 Breakout Sessions ......................................... 15 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Fourth Quarter FY 2005 December 5, 2005; Issue No. 45

274

Property:NEPA Resources | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:NEPA Resources Jump to: navigation, search Property Name NEPA Resources Property Type Page Description Resources that could be impacted by geothermal development and monitored by NEPA Subproperties This property has the following 10 subproperties: C CA-017-05-051 D DOE-EA-1116 DOE-EA-1621 D cont. DOE-EA-1733 DOE-EA-1849 DOI-BLM-CA-EA-2002-??? DOI-BLM-NV-C010-2012-0051-EA D cont. DOI-BLM-NV-CO10-2011-0501-EA DOI-BLM-OR-P040-0021-EA DOI-BLM-OR-V040-2009-0059-EA Pages using the property "NEPA Resources" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Recreation + Recreation + BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Economic_Values + Economic Values +

275

EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor The Department of Energy (DOE or the Department) announces the availability of two draft National Environmental Policy Act (NEPA) documents related to its Yucca Mountain Project: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel

276

DOE Withdraws Interpretive Rule and Provides Enforcement Guidance on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interpretive Rule and Provides Enforcement Guidance Interpretive Rule and Provides Enforcement Guidance on Showerheads DOE Withdraws Interpretive Rule and Provides Enforcement Guidance on Showerheads March 4, 2011 - 5:27pm Addthis The Department has withdrawn as unwarranted the draft interpretative rule setting out the Department's views on the definition of a "showerhead" for purposes of the water conservation standard enacted by Congress in 1992. To provide certainty going forward, however, the Department today provides a brief enforcement guidance, which balances the Department's obligation to enforce the congressional standard with its determination to avoid needless economic dislocation. The guidance, available here, explains how the Department intends to enforce the 1992 law and provides manufacturers a

277

Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance Guidance Guidance Cybersecurity These documents are currently under revision and awaiting management review and approval Cybersecurity Strategy - 2011 Cybersecurity Architecture - 2011 OMB Requirements Enterprise Architecture Enterprise Architecture Transition Plan - April 2011 Enterprise Architecture Guidance Records Management Centers of Excellence (pdf) Procedures and Instructions Records Management Handbook Design Criteria Standard for Electronic Records Management Software Applications NARA Bulletin 2011-02, Guidance on Managing Records in Web 2.0/Social Media Platforms NWM 27 2010, NARA Guidance for Developing Media Neutral Records Schedules and Notifications to NARA for Previously Scheduled Permanent Records NWM NARA Bulletin 2010-05, Guidance on Manageing Records in Cloud

278

EA-1829: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 3610 Morgantown, WV 26507-0880 Electronic mail: Jesse.Garcia@netl.doe.gov The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost

279

Energia Sierra Juarez U.S. Transmission Line Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement Summary August 2010 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Department of Energy Washington, DC 20585 August 2010 Dear Sir/Madam: Enclosed for your review and comment is the Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0414), prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The County of San Diego, California, is a cooperating agency in the preparation of this Draft EIS.

280

EA-1823: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1823: Draft Environmental Assessment Rockford Solar Energy Project, Chicago-Rockford Airport, Winnebago County, Illinois For more information contact: Mr. John Jediny, NEPA Document Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Telephone: 202-287-5380 Fax: 202-340-9260 Electronic mail: John.Jediny@ee.doe.gov Public Hearing: Date: Monday, October 24, 2011; Time: 4 p.m. to 7 p.m. Location: Auditorium at the Offices of the Greater Rockford Airport Authority, 60 Airport Drive, Rockford, Illinois, 61109 DOE's proposed action would authorize Federal funding to the Illinois Department of Commerce and Economic Opportunity under the State Energy Program.

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

282

EA-1665: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1665: Draft Environmental Assessment Davis-Kingman Tap 69-kV Transmission Line Rebuild, Mohave County, Arizona This Environmental Assessment (EA) evaluates the probable and known impacts to the environment from Western's Proposed Action, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with National Environmental Policy Act (NEPA) regulations published by the Council on Environmental Quality (CEQ) (40 CFR 1500-1508) and implementing procedures of DOE (10 CFR 1021). Western is the lead federal agency responsible for preparing the EA. The Department of Interior's (DOI) Bureau of Land Management (BLM) Kingman Field Office and Reclamation's Lower Colorado Regional Office are cooperating

283

NEPA Lessons Learned December 2010 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 1 0 1 Fourth Quarter FY 2010 December 1, 2010; Issue No. 65 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A CEQ Issues Categorical Exclusion Guidance After coordinating with Federal agencies and addressing public comments, the Council on Environmental Quality (CEQ) issued final guidance on Establishing, Applying,

284

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . National Environmental Policy Act N E P . A LESSONS Office of NEPA LEARNED QUARTERLY REPORT 1ST QUARTER FY 1995 Policy and Assistance U.S. Department of Energy March 1,1995 ODU- To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment Safety and Health to solicit comments from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the process, and to distribute a quarterly summary to all,NEPA Compliance Officers and NEPA Document Managers. This second quarterly report summarizes the lessons learned for documents completed between October 1 and December 31, 1994. It is based on responses to the revised

285

DOE-Wide NEPA Contracting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Wide NEPA Contracting DOE-Wide NEPA Contracting DOE-Wide NEPA Contracting DOE has seven indefinite delivery/indefinite quantity (task order) contracts for use by DOE Program and Field Offices nationwide, including the National Nuclear Security Agency (NNSA) and the Federal Energy Regulatory Commission.These contracts are for NEPA support services in preparing EISs and EAs, environmental reports and other documentation required by the Nuclear Regulatory Commission in its review of license applications, and other related environmental documents, such as floodplain and wetland assessments. The links above provide useful information to potential users of the DOE-wide NEPA contracts primarily DOE NEPA Compliance Officers, NEPA Document Managers, and Contracting Officers. The documents are public

286

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

continued next page continued next page Theme of October NEPA Compliance Officers Meeting Leading members of DOE’s NEPA community shared professional experiences and reflected upon job challenges at the DOE NEPA Compliance Officers (NCO) meeting held in Washington, DC on October 29-30. In addition to 29 NCOs, the participants included staff from the Offices of NEPA Policy and Assistance and the Assistant General Counsel for Environment. The meeting featured informal small group discussions, rather than presentations to a large audience. The meeting examined NCO and Office of Environment, Safety and Health (EH) roles and responsibilities, NEPA contracting reform, and how to get the most from programmatic NEPA documents. An early brainstorming session elicited aspects of the DOE NEPA compliance

287

NEPA Lessons Learned Quarterly Report December 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 2000 December 1, 2000; Issue No. 25 DOE NEPA Order Revised, National Nuclear Security Administration Responsibilities Outlined On October 26, 2000, the Deputy Secretary of Energy issued DOE O 451.1B, National Environmental Policy Act Compliance Program, to accommodate National Nuclear Security Administration (NNSA) NEPA responsibilities. The revised Order has an expanded section on applicability and a new section on NNSA procedures. With respect to an EIS for an NNSA activity, the NNSA Administrator will fulfill the responsibilities of a Secretarial Officer (including consulting with the NNSA General Counsel), and the Secretary or Deputy

288

WIPP Documents - National Environmental Policy Act (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System DOE/EA-1905 October 2011 This document examines the potential environmental impacts associated with providing DOE funding for the proposed improvements to the City of Carlsbad Double Eagle Water System Amendment to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic Waste This Federal Register Notice relates to DOE sending contact-handled and remote-handled transuranic waste from certain generator sites as needed to the Idaho National Laboratory to be treated and characterized prior to shipment to the Waste Isolation Pilot Plant for disposal. Environmental Assessment for Actinide Chemistry and Repository Science Laboratory

289

Property:NEPA Consultant | Open Energy Information  

Open Energy Info (EERE)

Consultant Consultant Jump to: navigation, search Property Name NEPA Consultant Property Type Page Pages using the property "NEPA Consultant" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + Environmental Management Associates + C CA-017-05-051 + Environmental Management Associates, Inc. + CA-067-2006-12 + Environmental Management Associates, Inc. + CA-170-02-15 + EMA Associates + CA-670-2010-107 + NA + CA-670-2010-CX + NA + CA-96062042 + MHA Environmental Consulting, Inc. + D DOE-EA-1621 + MHA Environmental Consulting + DOE-EA-1733 + RMT Inc + DOE-EIS-0298 + Environmental Management Associates, Inc. + DOI-BLM-CA-C050-2009-0005-EA + ICF International + DOI-BLM-CA-EA-2002-??? + MHA Environmental Consulting, Inc. +

290

NEPA Lessons Learned March 2010 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 1 0 1 First Quarter FY 2010 March 1, 2010; Issue No. 62 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A (continued on page 18) The Council on Environmental Quality (CEQ) marked the 40 th anniversary of the National Environmental Policy Act (NEPA), and of CEQ itself, with a celebratory symposium and reception in Washington, DC, on February 18, 2010.

291

LM_NEPA-APS-2013.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR FOR FROM: SUBJECT: Deparment of Energy Washington, DC 20585 January 29, 2013 GREGORY H. WOODS U.S. DEPARTMENT OF ENERGY OFFICE OF GENERAL COUNCIL, GC-1 n= DAVID S. SHAFER, Ph.D. C�d�KF= �= U.S. DEPARTMENT OF ENERGY OFFICE OF LEGACY MANAGEMENT OFFICE OF SITE OPERATIONS -ACTING DIRECTOR Annual NEP A Planning Summary Attached is the Annual NEPA Planning Summary for the U.S. Department of Energy, Offce of

292

NEPA Lessons Learned March 2011 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 1 1 First Quarter FY 2011 March 1, 2011; Issue No. 66 U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT National Environmental Policy Act LESSONS LEARNED LEARNED LESSONS N E P A DOE's publication of a Notice of Proposed Rulemaking for the Department's NEPA regulations marks a major milestone in updating its categorical exclusions (CXs). Since DOE last revised the "classes of actions" in

293

NNSA_KCFO_NEPA-APS-2013.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Nuclear Security Administration National Nuclear Security Administration Kansas City- Field Ofice 2000 E. 95th Street Kansas City, Missouri 64131-3030 January 31, 2013 MEMORANDUM FOR: GREGORY H. WOODS FROM: SUBJECT: {E �L o �= L. HOLECEK - ANAGER Annual National Environmental Policy Act (NEPA) Planning Summary for 2013 In response to your memorandum of December 7, 2012, the following summary information is provided for all field locations in Missouri and New Mexico that are managed by the

294

Property:NEPA FONSI | Open Energy Information  

Open Energy Info (EERE)

FONSI FONSI Jump to: navigation, search Property Name NEPA FONSI Property Type Page Description FONSI files for NEPA Docs This is a property of type Page. Pages using the property "NEPA FONSI" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + BLM-NV-WN-ES-08-01-1310 EA DR and FONSI.pdf + C CA-170-02-15 + EA CA-170-02-15-FONSI-DR.pdf + CA-96062042 + FourmileHill ROD.pdf + D DOE-EA-1621 + EA-1621-FONSI-2008.pdf + DOE-EA-1676 + EA-1676-FONSI-2009.pdf + DOE-EA-1733 + EA-1733-FONSI-2010.pdf + DOE-EA-1759 + EA-1759-FONSI-2010.pdf + DOE-EA-1849 + DOE-EA-1849-FONSI.pdf + DOE-EIS-0298 + TelephoneFlat ROD.pdf + DOI-BLM-CA-C050-2009-0005-EA + Management Review of AltaRock Project Final FONSI.pdf +, AltaRock FONSI 2009 09 11.pdf +

295

Property:NEPA Decision | Open Energy Information  

Open Energy Info (EERE)

Decision Decision Jump to: navigation, search Property Name NEPA Decision Property Type Page Description Files documenting decisions on NEPA Docs This is a property of type Page. Pages using the property "NEPA Decision" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + BLM-NV-WN-ES-08-01-1310 EA DR and FONSI.pdf + D DOE-EA-1621 + CX-001816.pdf + DOE-EA-1733 + CX-002924.pdf + DOE-EA-1961 + Kalispell-Kerr EA Determination Memo.pdf + DOI-BLM-NV-C010-2010-0006-EA + DOI-BLM-NV-W030-2010-0006-EA DECISION.pdf +, DOI-BLM-NV-W030-2010-0006-EA CONDITIONS.pdf + DOI-BLM-NV-C010-2011-0001-EA + Coyote Canyon Decision Record March 2011.pdf + DOI-BLM-NV-C010-2011-0514-EA + DOI-BLM-C010-2011-0514-EA-DR.pdf + DOI-BLM-NV-C010-2011-0516-EA + DixieMeadows DecisionRecord 01 17 12.pdf +

296

2007 NEPA Survey 7.17.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Navy 1 0 Adverse dispositions: 95 NRC 0 1 TRO 2 DOI - BLM 7 8 Preliminary Injunction 10 - FWS 3 1 Permanent Injunction 18 - BuRec 3 0 Remand 23 - NPS 2 1 Dismissal w/ settlement 15 - BIA/NIGC 2 0 Dismissal w/o settlement 27 - MMS 2 0 Case pending, NEPA 168 - OSM 1 0 USDA - FS 40 23 - APHIS 1 4 DOC - NOAA 2 2 Army - COE 1 3 Gov't Agency Army 0 2 Jurisdictional - P prevailed 3 DOT - FHWA 4 0 Jurisdictional - D prevailed 12 - FTA 2 0 NEPA - Not required 10 - FAA 5 1 NEPA - Is required 4 DOE 1 0 CE - Adequate 7 EPA 2 1 CE - Not Adequate 6 HUD 0 0 EA - Adequate* 14 Air Force 0 1 EA - Not Adequate* 15 TVA 1 1 EIS - Adequate* 29 FCC 0 0 EIS - Not Adequate* 35 GSA 0 0 SEIS - Needed* 9 Ex-Im Bank (OPEC) 0 0 SEIS -Not Needed* 6 USPS 1 0 HHS-FDA 1 0 -NIH 0 0 VA 0 0 DHS - CBP 1 0 - CG 1

297

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Advanced Nuclear Energy Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS DRAFT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION...

298

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

299

Biomass 2014 Draft Agenda | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Biomass 2014 Draft Agenda Biomass 2014 Draft Agenda The following document is a draft agenda for the Biomass 2014: Growing the Future Bioeconomy conference. Biomass 2014 Draft...

300

DOE/EIS-0303D; High-Level Waste Tank Closure Draft Environmental Impact Statement (November 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0303D EIS-0303D DRAFT November 2000 Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, High-Level Waste Tank Closure Draft Environmental Impact Statement (DOE/EIS-0303D), Aiken, SC. CONTACT: For additional information or to submit comments on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm For general information on the process that DOE follows in complying with the National Environmental

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Draft 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 08 Charter for the Dr. Sessoms Subcommittee Charter International Subcommittee of Nuclear Energy Advisor Committee (NEAC) Office of Nuclear Energy U.S. Department of Energy Purpose: The purpose of the International Subcommittee is to review and provide expert guidance to the Assistant Secretary for Nuclear Energy, through NEAC, on international nuclear energy policy which aims to support the safe, secure and peaceful expanded use of nuclear energy in a manner that minimizes the risks of proliferation. International nuclear energy policy includes efforts to build and strengthen reliable international nuclear fuel service arrangements, international nuclear energy infrastructure development, and bilateral and multilateral efforts that help further U.S. technical and

302

Buy American Program Guidance  

Energy.gov (U.S. Department of Energy (DOE))

Guidance on the Buy American provision as applied to Energy Efficiency and Renewable Energy Projects funded by the American Recovery and Reinvestment Act of 2009. Office of EERE Guidance effective December 17, 2009.

303

Child Guidance Techniques.  

E-Print Network (OSTI)

TDOC Z TA24S.7 8873 NO.1314 Child Guidance Techniques The Texas MM University System ~ Texas Agricultural Extension Service DMia! C. Pfannstiel . Director College Station B-1314 ... 2 Contents Helpful Guidance T echniques...

Fraiser, Roberta C.

1982-01-01T23:59:59.000Z

304

Management Transition Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Records and Information Records and Information Management Transition Guidance November 2013 Records and Information Management Transition Guidance i Records and Information Management Transition Guidance Table of Contents Executive Summary ........................................................................................................................ 1 1.0 Introduction and Purpose ..................................................................................................... 1 LM Records Functions ................................................................................................................ 1 2.0 The Records Life Cycle ....................................................................................................... 2 3.0 Organizational Responsibilities ........................................................................................... 2

305

Glossary of Terms Used in DOE NEPA Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N E P A GLOSSARY OF TERMS USED IN DOE NEPA DOCUMENTS September 1998 U.S. Department of Energy Office of NEPA Policy and Compliance Glossary of Terms Used in DOE NEPA Documents SEPTEMBER 1998 U.S. DEPARTMENT OF ENERGY OFFICE OF NEPA POLICY AND COMPLIANCE PREFACE Purpose of this Glossary This Glossary is provided as a resource for preparing technical glossaries and related explanatory material (such as text-box explanations of technical concepts) for DOE National Environmental Policy Act (NEPA) documents. Technical terms used in DOE NEPA documents should be defined to aid lay readers' understanding. Definitions may be provided either in the body of the document (recommended for terms that have different meanings technically than colloquially,

306

EIS-0359: Notice of Change in National Environmental Policy (NEPA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Change in National Environmental Policy (NEPA) Notice of Change in National Environmental Policy (NEPA) Compliance Approach EIS-0359: Notice of Change in National Environmental Policy (NEPA) Compliance Approach Depleted Uranium Hexafluoride (DUF6) Conversion Facilities Project Notice of Change in National Environmental Policy (NEPA) Compliance Approach for the Depleted Uranium Hexafluoride (DUF6) Conversion Facilities Project (4/28/03). The purpose of this Notice is to inform the public of the change in the approach for the NEPA review for the DUF6 conversion projects for Paducah and Portsmouth, and to invite public comments on the revised approach. DOE/EIS-0359, Department of Energy, Notice of Change in National Environmental Policy (NEPA) Compliance Approach for the Depleted Uranium Hexafluoride (DUF6) Conversion Facilities Project, 68 FR 22368 (April 2003)

307

NEPA Implementation Procedures: Appendices I, II, and III | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III These appendices are intended to improve public participation and facilitate agency compliance with the National Environmental Policy Act (NEPA) and the Council on Environmental Quality's NEPA Regulations, the last version appeared in the Federal Register of Friday, December 21,1984 (49 FR 49754). Note: The specfic contact information is outdated and should not be used for consultation or outreach. Appendix I - Federal and Federal-State Agency NEPA Contacts Appendix II - Federal and Federal- State Agencies With Jurisdiction by Law or Special Expertise on Environmental Quality Issues Appendix III - Federal and Federal-State Agency Offices for

308

Draft-O-Meter  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will learn an easy technique to measure the presence of drafts in their homes and classrooms.

309

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

310

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA -- Amended Environmental Impact Statement Filing System EPA -- Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

311

EPA -- Amended Environmental Impact Statement Filing System Guidance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Environmental Impact Statement Filing System Amended Environmental Impact Statement Filing System Guidance EPA -- Amended Environmental Impact Statement Filing System Guidance Amended Environmental Impact Statement Filing System Guidance for Implementing 40 CFR 1506.9 and 1506.10 of the Council on Environmental Quality's Regulations Implementing the National Environmental Policy Act The purpose of the EPA Filing System Guidelines is to provide guidance to federal agencies on filing draft, final, and supplemental EISs. Information is provided on: (1) how to file an EIS; (2) the steps to follow when adopting an EIS, or when an EIS is withdrawn, delayed or reopened; (3) public review periods; (4) issuance of notices of availability in the Federal Register; and (5) retention of filed EISs. These updated guidelines

312

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network (OSTI)

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

313

States with NEPA-like Environmental Planning Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Several states have environmental planning requirements that are similar to NEPA. These requirements are either State laws, regulations, or executive orders. Please click below for additional...

314

NEPA Implementation Procedures: Appendices I, II, and III | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III These appendices were prepared by the Council on Environmental...

315

NEPA DETERMINATION: LM-01-13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETERMINATION: LM-01-13 NEPA DETERMINATION: LM-01-13 Current and Future Actions Related to Installation, Sampling, Abandonment, and Repair of Monitoring Wells at the Pinellas...

316

Need to Consider Intentional Destructive Acts in NEPA Documents...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental consequences of intentional destructive acts (i.e., acts of sabotage or terrorism). Need to Consider Intentional Destructive Acts in NEPA Documents More Documents &...

317

Council on Environmental Quality - Emergency Actions and NEPA...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Memorandum: Council on Environmental Quality - Emergency Actions and NEPA Abstract This memorandum provides general information on...

318

NEPA and CEQA: Integrating State and Federal Environmental Reviews...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

California Governor's Office of Planning and Research (OPR) have jointly prepared the handbook "NEPA and CEQA: Integrating Federal and State Environmental Reviews." The handbook...

319

RAPID/Best Practices/NEPA Timelines | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Resources Contribute Contact Us Best Practice: NEPA Timelines Project Type -1...

320

Office of NEPA Policy and Compliance | Department of Energy  

Energy Savers (EERE)

2014 Directory of Potential Stakeholders for DOE Actions under NEPA Issued May 12, 2014 DOE Issues Record of Decision for the Uranium Leasing Program March 7, 2014 Handbook...

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - PR-10085844 NEPA.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5844 5844 Title: Replace BC 500 KVA Power Transformer Description: Subcontractor shall provide all labor, supervision, tools, equipment, and transportation required to procure, transport, install, test and pre-commission the new BC 500 KVA power transformer, SDTFW and new switch assembly. Work includes transportation of the transformer and switch assembly from the manufacturer's plant to BC; removal of existing equipment; unloading, assembly and installation of new equipment; and pre-commission testing. Subcontractor shall provide the lifting equipment required to remove the existing transformer and switch assembly, and to install the new equipment. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions)

322

Category:NEPA Resources | Open Energy Information  

Open Energy Info (EERE)

Resources Resources Jump to: navigation, search Category of resources that could be impacted by activities related to geothermal development. Pages in category "NEPA Resources" The following 39 pages are in this category, out of 39 total. A Access and Transportation Air Quality Areas of Critical Environmental Concern B BLM Sensitive Species C Candidate and Special Status Species Cultural Resources E Economic Values Environmental Justice F Fire Resources Fisheries Resources Floodplains G Geology and Minerals I Induced Seismicity Impact I cont. Intentional Destructive Acts Invasive, Nonnative Species L Lands and Realty Lands with Wilderness Characteristics M Migratory Birds N Native American Concerns Noise P Paleontological Resources Prime or Unique Farmlands Public Health and Safety

323

Draft 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Charter for Dr. Richter's Subcommittee Charter for Dr. Richter's Subcommittee Charter Fuel Cycle Research and Development Subcommittee of Nuclear Energy Advisor Committee (NEAC) Office of Nuclear Energy U.S. Department of Energy Purpose: The purpose of the Fuel Cycle Research and Development (FCR&D) Subcommittee is to review and provide expert guidance to the Assistant Secretary for Nuclear Energy, through NEAC, on both the short term and longer term direction of research and development in the area of Fuel Cycle Research and Development. Topical areas for review by the subcommittee include, but are not limited to, once-through, modified open and fully closed fuel cycles, deep burn fuels, innovative advanced light water reactor fuels, and transmutation fuels. Other topical areas for review can be added by the

324

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

440: DOE and EPA Notice of Availability of a Draft 440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

325

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: DOE and EPA Notice of Availability of a Draft 40: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

326

EA-1792-S1: DOE Notice of Availability of the Draft Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Finding of No Significant Impact

327

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements" "Bonneville Power Administration Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities Environmental Impact Statements" "application/vnd.ms-excel" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"I-5 Corridor Reinforcement Project Cowlitz and Clark Counties, WA and Multnomah County, OR",5000000,"Determination Date:","application/vnd.ms-excel"," Construct about 70 miles of new 500-kV line between a new proposed substation near Castle Rock, WA and an exsting BPA substation in Troutdale, OR"

328

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

329

Draft Site-Wide EIS on the Continued Operation of the Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responsible Agency: U.S. Department of Energy (DOE) Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agency: Incorporated County of Los Alamos Title: Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico Contact: For further information, or to submit comments concerning this Draft Site-Wide Environmental Impact Statement (SWEIS), contact: Corey Cruz, Project Manager U.S. DOE, Albuquerque Operations Office P.O. Box 5400, Albuquerque, NM 87185 Telephone: 1-800-898-6623 Fax: 505-845-6392 For general information on DOE's National Environmental Policy Act (NEPA) process, contact: Carol Borgstrom, Director Office of NEPA Policy and Assistance (EH-42) U.S. DOE, 1000 Independence Avenue, SW, Washington, DC 20585 Telephone: 202-586-4600 or leave a message at 1-800-472-2756

330

Energy Department Revises NEPA Regulations to Improve Efficiency |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revises NEPA Regulations to Improve Efficiency Revises NEPA Regulations to Improve Efficiency Energy Department Revises NEPA Regulations to Improve Efficiency October 3, 2011 - 12:39pm Addthis Washington, D.C. -- The U.S. Department of Energy will save time and money in its environmental reviews of many proposed energy projects under revised regulations approved September 27, 2011, to implement the National Environmental Policy Act (NEPA). The revisions focus on the Department's categorical exclusion provisions, and reflect the first update to these provisions in 15 years. A categorical exclusion applies to a class of actions that an agency has determined normally do not individually or cumulatively have a significant impact on the human environment. "Updating our NEPA rule allows us to accomplish our environmental reviews

331

NEPA Lessons Learned Quarterly Report - 2nd Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

For Inside LESSONS LEARNED For Inside LESSONS LEARNED See Page 2 Do you need an environmental assessment, environmental impact statement, environmental report or a portion of one? Would you like to begin work within a few weeks? Would you like to use the best, most experienced contractors at unbeatable prices? Do you want to fully control your NEPA contracting locally? We will soon have contracts that will let you do all this and more! This may sound too good to be true, but the hard work of the DOE-wide NEPA Contract Source Evaluation Panel (and many others in the NEPA contract reform initiative) have made this dream a reality. The Panel, chaired by Roger Twitchell, NEPA Compliance Officer, Idaho Operations Office, has implemented ideas first discussed at the NEPA Contracting Reform Workshop in

332

The Application of NEPA to CERCLA Cleanups | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the National Environmental Policy Act (NEPA) to the cleanup of federal facilities under the CERCLA Superfund program. The meeting focused on proposals for addressing problems that have arisen from DOE's attempts to integrate the procedural and analytical approaches of NEPA into the CERCLA cleanup process. This document describes what was discussed at the meeting and the consensus reached there.

333

DOE Advances Innovative CCS Polygeneration Plant Through NEPA Process |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advances Innovative CCS Polygeneration Plant Through NEPA Advances Innovative CCS Polygeneration Plant Through NEPA Process DOE Advances Innovative CCS Polygeneration Plant Through NEPA Process July 9, 2012 - 1:00pm Addthis Washington, D.C. -- The U.S. Department of Energy (DOE) and the California Energy Commission (CEC) are working together to advance an innovative carbon capture and storage (CCS) plant simultaneously through the federal National Environmental Policy Act (NEPA) review and a complementary California Energy Quality Act process. As part of the NEPA process, DOE and CEC will hold a public meeting on July 12, 2012, at the Elk Hills Elementary School at 501 Kern St. in Tupman, Calif., at 5 p.m PDT. This will be an opportunity for the public to offer their comments and view the project site in Elk Hills, Kern County, Calif.

334

DOE Revises its NEPA Regulations, Including Categorical Exclusions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revises its NEPA Regulations, Including Categorical Exclusions Revises its NEPA Regulations, Including Categorical Exclusions DOE Revises its NEPA Regulations, Including Categorical Exclusions September 30, 2011 - 2:30pm Addthis On September 27, 2011, the Department of Energy (DOE) approved revisions to its National Environmental Policy Act (NEPA) regulations, and on September 28th, submitted the revisions to the Federal Register. The final regulations, which become effective 30 days after publication in the Federal Register, are the culmination of a 2-year process to review and update DOE's NEPA implementing procedures. This process involved internal evaluation, public participation, and Council on Environmental Quality (CEQ) review. The revisions are designed to focus Departmental resources on projects with the potential for significant environmental impact, to better

335

National Environmental Policy Act (NEPA) | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Environmental Policy Act (NEPA) | National Nuclear Security Environmental Policy Act (NEPA) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog National Environmental Policy Act (NEPA) Home > About Us > Our Operations > NNSA Office of General Counsel > National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Welcome to the U.S. Department of Energy National Nuclear Security

336

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 Fed Reg 36222) 61 Fed Reg 36222) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) DOE amended its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. These amendments also incorporate changes necessary to conform to recent changes in DOE's missions, programs, and policies that have evolved in response to changing national priorities since the current regulations were issued in 1992. 61 Fed Reg 36222: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications

337

The Application of NEPA to CERCLA Cleanups | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the National Environmental Policy Act (NEPA) to the cleanup of federal facilities under the CERCLA Superfund program. The meeting focused on proposals for addressing problems that have arisen from DOE's attempts to integrate the procedural and analytical approaches of NEPA into the CERCLA cleanup process. This document describes what was discussed at the meeting and the consensus reached there.

338

National Environmental Policy Act (NEPA) | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Policy Act (NEPA) | National Nuclear Security Environmental Policy Act (NEPA) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog National Environmental Policy Act (NEPA) Home > About Us > Our Operations > NNSA Office of General Counsel > National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Welcome to the U.S. Department of Energy National Nuclear Security

339

Council on Environmental Quality - A Citizen's Guide to the NEPA...  

Open Energy Info (EERE)

to library PermittingRegulatory Guidance - GuideHandbook: Council on Environmental Quality - A Citizen's Guide to the NEPAPermittingRegulatory GuidanceGuideHandbook Abstract...

340

EIS-0283DS Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Sheet Responsible Agency: United States Department of Energy (DOE) Title: Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement (Supplement) (DOE/EIS-0283-DS) Locations of Candidate Sites: Idaho, North Carolina, South Carolina, Texas, Virginia, and Washington Contacts: For further information on the Supplement contact: For further information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Office of Fissile Materials Disposition U.S. Department of Energy P.O. Box 23786 Washington, DC 20026-3786 Voice: (202) 586-5368 Ms. Carol Borgstrom, Director Office of NEPA Policy and Assistance Office of Environment, Safety and Health U.S. Department of Energy 1000 Independence Ave., SW

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

LCC Guidance Rates  

Energy.gov (U.S. Department of Energy (DOE))

Notepad text file provides the LCC guidance rates in a numbered format for the various regions throughout the U.S.

342

wind_guidance  

Energy.gov (U.S. Department of Energy (DOE))

Guidance to Accompany Non-Availability Waiver of the Recovery Act Buy American Provisions for 5kW and 50kW Wind Turbines

343

QA in Design Guidance  

Energy.gov (U.S. Department of Energy (DOE))

This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM.

344

High Performance and Sustainable Buildings Guidance | Department...  

Energy Savers (EERE)

High Performance and Sustainable Buildings Guidance High Performance and Sustainable Buildings Guidance High Performance and Sustainable Buildings Guidance More Documents &...

345

Information and Records Management Transition Guidance | Department...  

Energy Savers (EERE)

Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004)...

346

U.S. Department of Energy Audit Guidance: For-Profit Recipients  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

For-profit comments and responses For-profit comments and responses U.S. Department of Energy Audit Guidance: For-Profit Recipients Comments and Responses to U.S. Department of Energy Request for Information Federal Register Notice 2011-32622 Note that the comment categories do not correlate to the lettered sections of the guidance, ie Comment Category A does not correspond with Section A of either part of the guidance .) Comment Category A: Clarification of whether we are requesting a single audit. Two commenters felt that the guidance should state that DOE wants a single audit report per recipient. Commenter 1 stated that the guidance under Part I, of the Draft 2011 'U.S. Department of Energy Audit Guidance: For-Profit Recipients' (hereafter referred to as Part I), Section E is still unclear and should specifically

347

https://www.eere-pmc.energy.gov/NEPA/Nepa_ef2a.aspx?Key=11188  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECIPIENT:Louisiana -- Louisiana Tank STATE: LA PROJECT TITLE : Recovery Act -- State Energy Program Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000052 EE0000124 GFO-0000124-016 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

348

Microsoft InfoPath - nepa_19496.xml  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

67 67 Title: Replace Brine Disposal System Header to WH Brine Tanks Description: Subcontractor shall shall provide all labor, materials, tools, equipment, and supervision required to replace the existing brine disposal piping to the WH brine tanks with new cement lined piping and fittings, to be supplied by others as Government Furnished Equipment under WH-MM-767A. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

349

National Environmental Policy Act (NEPA) Compliance Guide Volume 1 - General NEPA References  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QVTRM= Federal Register L= QVTRM= Federal Register L= Vol. QVI= No. 247 L= Friday, aecemer= 21, 198 f Rules and oegul~tions= COUNCIL ON ENVIRONMENT AL QLl.'LITY QM=CFR Ch. V Na1ional Environmental Policy Act (NEPA) Implementation Procedures; Appendices I, II, and Ill AGENCv: Council on Environmental Quality. Execulivp Office of the President. ACTION: Appendices to regulations. IUMMARV: These appendices are

350

Microsoft Word - CX Posting Implementation Guidance -- Rev1 -- 5-25-10.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rev. 1 - May 25, 2010 Rev. 1 - May 25, 2010 Office of NEPA Policy and Compliance 1 Implementation Guidance for the DOE Policy on Documentation and Online Posting of Categorical Exclusion Determinations: NEPA Process Transparency and Openness To further transparency and openness in its implementation of the National Environmental Policy Act (NEPA), the Department of Energy (DOE) has established a policy with regard to the online posting of certain categorical exclusion determinations. Under the policy, each Program and Field Office (including the National Nuclear Security Administration and the Power Marketing Administrations) will document and post online all categorical exclusion (CX) determinations involving classes of actions listed in Appendix B to Subpart D of the

351

Lessons Learned Quarterly Report, March 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Lessons Learned Quarterly Report, March 2012 This issue features successful practices from recent NEPA reviews and current Council on Environmental Quality initiatives promoting efficient NEPA compliance. Articles in this issue include: Keys to Managing an Expanded NEPA Workload Recent NEPA Reviews Ilustrate Lessons Learned NEPA Order Revision Incorporates Public Review of EAs Bureau of Reclamation Updates NEPA Handbook CEQ Expands NEPA Modernization Activities CEQ Draft Guidance Promotes Efficiencies CEQ Selects Pilot Projects DOE-Wide NEPA Contracts Update NEPA Contracts: Task Ordering Process Most DOE EISs Involve Cooperating Agencies Annual Planning Summaries Transitions Litigation Updates 2012 National Environmental Justice Conference Training Opportunities

352

Draft General Conformity Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Draft General Conformity Determination U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix I Draft General Conformity Determination Draft General Conformity Determination Cape Wind Energy Project Prepared by Minerals Management Service Herndon, VA November 2008 i TABLE OF CONTENTS 1.0 INTRODUCTION TO THE PROPOSED ACTION............................................................... 1 2.0 GENERAL CONFORMITY REGULATORY BACKGROUND .......................................... 2 2.1 GENERAL CONFORMITY REQUIREMENTS.................................................................... 2 2.2 GENERAL CONFORMITY APPLICABILITY.....................................................................

353

Introducing BEST PRACTICE GUIDANCE  

E-Print Network (OSTI)

placement 6. Application of sewage sludges and composts 7. Fertiliser application in land regeneration 8Introducing BEST PRACTICE GUIDANCE FOR LAND REGENERATION Best Practice Guidance for Land of brownfield land for woodland and urban greening after uses. The Notes are devised for practitioners and all

354

Preliminary Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

355

Guidance for Planning Exercises  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

356

ARM - Social Media Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

CenterSocial Media Guidance CenterSocial Media Guidance Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance Social Media Guidance Comments The ARM Climate Research Facility (ARM) welcomes comments on our website, blog, and our social media sites such as Facebook, Flickr, and YouTube. Comments are welcome at any time; however, responses to comments will

357

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

358

NEPA and CEQA: Integrating State and Federal Environmental Reviews (Final)  

Energy.gov (U.S. Department of Energy (DOE))

CEQ and the California Governors Office of Planning and Research (OPR) have jointly prepared the handbook NEPA and CEQA: Integrating Federal and State Environmental Reviews. The handbook provides practitioners with an overview of NEPA and CEQA as well as suggestions for developing a single environmental review process that can meet the requirements of both statutes. The handbook also provides a framework for a Memorandum of Understanding (MOU) between two or more agencies entering into a joint NEPA/ CEQA review process, and addresses the California Energy Commission licensing process, which takes the place of the CEQA process for certain power plants

359

NEPA Success Stories: Celebrating 40 Years of Transparency and Open Government  

Energy.gov (U.S. Department of Energy (DOE))

NEPA Success Stories: Celebrating 40 Years of Transparency and Open Government, Environmental Law Institute, 2010.

360

QA in Design Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT Guidance Document for Integrating Quality Assurance During the Design and Construction Life Cycle September 2011 Page 2 of 29 FOREWORD This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM. A project's Quality Assurance Program assigns responsibilities and authorities, defines policies and requirements, and provides for the performance and assessment of work that provides confidence that required level of quality is achieved, commensurate with the various project requirements. This guidance document offers for evaluation, by project personnel from EM and contractor

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

National Environmental Policy Act (NEPA) Categorically Excluded Actions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA » National NEPA » National Environmental Policy Act (NEPA) Categorically Excluded Actions National Environmental Policy Act (NEPA) Categorically Excluded Actions Categorical Exclusions (CX) - Categorical exclusions are categories of actions that DOE has determined, by regulation, do not individually or cumulatively have a significant effect on the human environment and for which neither an environmental assessment nor an environmental impact statement is typically required. Title 10 Code of Federal Regulations Part 1021, National Environmental Policy Act Implementing Procedures, Appendices A and B to Subpart D, list DOE's categorical exclusions. Appendix A classes of actions are those actions considered to be general agency actions, such as awarding a contract or hiring personnel. Appendix B classes of actions

362

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

068 068 Re ent: City of Reno, NV ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Reno Interior Energy Efficiency Retrofits; Reno Exterior Energy Efficiency Retrofits; Reno Solar Onsite Renewable Energy; Reno Wind Onsite Renewable Energy 83.1, B5.1 Waste Stream, Historical Preservation, and Engineering Clauses Wind Turbines Only: Allowable: Any administrative actions/audits associated with this activity. Prohibited: Any implementation of projects/construction activity without NEPA approval from DOE Design and Size of the wind turbines needs to be supplied to DOE for NEPA Analysis. Additional Comments: Design and Size of the wind turbines needs to be supplied to DOE for NEPA

363

Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum for General Counsels, NEPA Liaisons and Participants in Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping As part of its continuing oversight of the implementation of the NEPA regulations, the Council on Environmental Quality has been investigating agency experience with scoping. This is the process by which the scope of the issues and alternatives to be examined in an EIS is determined. In a project led by Barbara Bramble of the General Counsel's staff the Council asked federal agencies to report their scoping experiences; Council staff held meetings and workshops in all regions of the country to discuss scoping practice; and a contract study was performed for the Council to investigate what techniques work best for various kinds of proposals.

364

Cooperating Agencies in Implementing the Procedural Requirements of NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2002 30, 2002 MEMORANDUM FOR THE HEADS OF FEDERAL AGENCIES FROM: JAMES CONNAUGHTON Chair SUBJECT: COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT The purpose of this Memorandum is to ensure that all Federal agencies are actively considering designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that Federal agencies actively participate as cooperating agencies in other agency's NEPA processes. 1 The CEQ regulations addressing cooperating agencies status (40 C.F.R. §§ 1501.6 & 1508.5) implement the NEPA mandate that Federal agencies responsible for preparing NEPA

365

Property:NEPA ApplicationAttachments | Open Energy Information  

Open Energy Info (EERE)

ApplicationAttachments ApplicationAttachments Jump to: navigation, search Property Name NEPA ApplicationAttachments Property Type Page Description FONSI files for NEPA Docs. For example: Cover letters, Plan of Operations, Maps. This is a property of type Page. It links to pages that use the form NEPA_Doc. Pages using the property "NEPA ApplicationAttachments" Showing 25 pages using this property. (previous 25) (next 25) D DOI-BLM-NV-C010-2009-0030-CX + 87401 - Proposed Action.pdf +, 87402 - Proposed Action.pdf +, 87400 - Proposed Action.pdf +, ... DOI-BLM-NV-C010-2010-0008-CX + 88211 - Proposed Action.pdf + DOI-BLM-NV-C010-2011-0514-EA + Figure 1 Project Location 032111.pdf +, Figure 2 Project Boundary Leases and Land Status 032111.pdf +, Figure 3 Proposed Disturbance 060211.pdf +, ...

366

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

685 685 Recipier -ounty of Clark ., NV ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Comprehensive Building A9 This NEPA determination is limited to Energy audits and Energy All conducting audits/compiling the results of Conservation Measures B5.1 the audits/and making recommendations and the installation of an energy software system and real-time energy meters only. Building Energy Retro fits B2.5 Waste Stream Clause B5.1 Historic Preservation Clause Engineering clause *This NEPA determination is limited to retrofits and EE activities on existing buildings only. RE activities are prohibited pending further NEPA review. 2 30kw Solar power arrays at

367

Office of NEPA Policy and Compliance, Staff Directory  

Energy.gov (U.S. Department of Energy (DOE))

Office of NEPA Policy and Compliance, Staff Directory including phone number and areas of responsibility for the Energy and Waste Management Unit, Western Energy and Waste Management Unit, and the...

368

Glossary of Terms Used in DOE NEPA Documents  

Energy.gov (U.S. Department of Energy (DOE))

This Glossary is provided as a resource for preparing technical glossaries and related explanatory material (such as text-box explanations of technical concepts) for DOE National Environmental Policy Act (NEPA) documents.

369

DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57 Fed Reg 15122) DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122) DOE revised the existing rule at 10 CFR part 1021, titled "Compliance with the National...

370

NEPA Determination: LM-08-12 Amendment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-12 Amendment NEPA Determination: LM-08-12 Amendment Grazing Agreement Amendment, Acid Pond, Spook, Wyoming CX(s) Applied: B1.24 Date: 09122012 Location(s): Spook, WY...

371

Council on Environmental Quality (CEQ) NEPA Regulations: 40 CFR...  

Open Energy Info (EERE)

Quality (CEQ) NEPA Regulations: 40 CFR 1500 - 1518 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Secondary Legal SourceSecondary Legal Source:...

372

EPA's Section 309 Review: The Clean Air Act and NEPA  

Energy.gov (U.S. Department of Energy (DOE))

This document discusses Section 309 of the Clean Air Act, which authorizes the Environmental Protection Agency to review certain proposed actions of other federal agencies in accordance with NEPA and make those reviews public.

373

Department of Energy - Office of NEPA Policy and Compliance ...  

Open Energy Info (EERE)

Policy and Compliance Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Department of Energy - Office of NEPA Policy and Compliance Abstract This website...

374

Revised Draft Guidance for EPAct 2005 Section 242 Program | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

is directed to provide incentive payments to the owner or operator of qualified hydroelectric facilities for electric energy generated and sold from a qualified hydroelectric...

375

DOE/EIS-0289; Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project, August 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA August 1999 U.S. DEPARTMENT OF ENERGY COVER SHEET August 1999 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, Federal Energy Technology Center, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@fetc.doe.gov.

376

The Application of NEPA to CERCLA Cleanups  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dcpart.meDlo[ Dcpart.meDlo[ J)JSticc :~ ~ - Emrironment~ndNatural Resources Division Auut4l,JI Antmlt';,l' GrlJrrol WttSlrills;lIm, 1.1- C 20530 January 23, '~,995 MEMORANDUM TO: Steven Herman, EPA 'Jean Nelson, EPA Scott'Fulton, EPA Geoffrey Garver, EPA Robert Nprdhaus, DOE Mary Arine SuI 1 i van, 'DOE E~len Livingston Behan, DOE Katie McGinty;. CEQ , Ray Clark, CEQ Elisabeth Blaug., CEQ .Sherri Wasserman Goodman, DDD Patricia Rivers, DDD FROM: ,{'0:' Lois J. Schiffer Assistant Attorney General EnvLrcmment & Natural Resources Division SU~~CT: Agreed to Repor~ of March 31, 1994 ~eeting Regarding The Applicationof NEPA t.o CERCLA CJ..eanu'ps On Ma~ch 31, 1994~ officiatsfromthe Departrnentof Energy ,(DOE). the Environmental Protection Age.ncy (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant 'Attorney General Lois Schiffer and other representatives

377

The Application of NEPA to CERCLA Cleanups  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dcpart.meDlo[ Dcpart.meDlo[ J)JSticc :~ ~ - Emrironment~ndNatural Resources Division Auut4l,JI Antmlt';,l' GrlJrrol WttSlrills;lIm, 1.1- C 20530 January 23, '~,995 MEMORANDUM TO: Steven Herman, EPA 'Jean Nelson, EPA Scott'Fulton, EPA Geoffrey Garver, EPA Robert Nprdhaus, DOE Mary Arine SuI 1 i van, 'DOE E~len Livingston Behan, DOE Katie McGinty;. CEQ , Ray Clark, CEQ Elisabeth Blaug., CEQ .Sherri Wasserman Goodman, DDD Patricia Rivers, DDD FROM: ,{'0:' Lois J. Schiffer Assistant Attorney General EnvLrcmment & Natural Resources Division SU~~CT: Agreed to Repor~ of March 31, 1994 ~eeting Regarding The Applicationof NEPA t.o CERCLA CJ..eanu'ps On Ma~ch 31, 1994~ officiatsfromthe Departrnentof Energy ,(DOE). the Environmental Protection Age.ncy (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant 'Attorney General Lois Schiffer and other representatives

378

2009 NEPA Lit Survey - In Progress - Master.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Judgment for defendant Judgment for defendant 76 ARMY-ELD 0 0 Dismissal w/o settlement 24 ARMY-USACE 5 4 Settlement 22 DHS 3 0 Adverse dispositions: 23 DOC 12 0 TRO 0 DOE 4 1 Preliminary Injunction 2 DOI-BIA 0 0 Permanent Injunction 15 DOI-BLM 2 2 Remand 6 DOI-BOR 3 1 Case pending, NEPA 271 DOI-FWS 0 0 DOI-MMS 0 0 DOI-NPS 0 0 DOI-OSM 0 0 DOI-SOL 0 0 DOS-L/OES 0 0 Jurisdictional - P prevailed 0 DOT-FAA 1 0 Jurisdictional - D prevailed 20 DOT-FHWA 12 2 NEPA - Not required 2 DOT-FTA 1 0 NEPA - Is required 2 DOT-MA 0 0 CE - Adequate 5 EPA 1 0 CE - Not Adequate 0 FCC 0 0 EA - Adequate* 23 FERC 2 0 EA - Not Adequate* 5 GSA 0 0 EIS - Adequate* 21 HHS/NIH 0 0 EIS - Not Adequate* 20 HUD 0 0 SEIS - Needed* 3 NAVY 1 0 SEIS -Not Needed* 3 NRC 4 0 TVA 0 1 USAF 1 0 USDA 43 12 VA 2 0 Total 97 23 2009 NEPA Case Dispositions NEPA Cases in 2009 Basis for NEPA Dispositions * More detailed info in tables below

379

Geothermal NEPA Database on OpenEI (Poster)  

SciTech Connect

The National Renewable Energy Laboratory (NREL) developed the Geothermal National Environmental Policy Act (NEPA) Database as a platform for government agencies and industry to access and maintain information related to geothermal NEPA documents. The data were collected to inform analyses of NEPA timelines, and the collected data were made publically available via this tool in case others might find the data useful. NREL staff and contractors collected documents from agency websites, during visits to the two busiest Bureau of Land Management (BLM) field offices for geothermal development, and through email and phone call requests from other BLM field offices. They then entered the information into the database, hosted by Open Energy Information (http://en.openei.org/wiki/RAPID/NEPA). The long-term success of the project will depend on the willingness of federal agencies, industry, and others to populate the database with NEPA and related documents, and to use the data for their own analyses. As the information and capabilities of the database expand, developers and agencies can save time on new NEPA reports by accessing a single location to research related activities, their potential impacts, and previously proposed and imposed mitigation measures. NREL used a wiki platform to allow industry and agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users.

Young, K. R.; Levine, A.

2014-09-01T23:59:59.000Z

380

GENII Guidance Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GENII Computer Code GENII Computer Code Application Guidance for Documented Safety Analysis Final Report U.S. Department of Energy Office of Environment, Safety, and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 July 2004 GENII Guidance Report July 2004 Final Report INTENTIONALLY BLANK ii GENII Guidance Report July 2004 Final Report FOREWORD This document provides guidance to Department of Energy (DOE) facility analysts in the use of the GENII computer code for supporting Documented Safety Analysis applications. Information is provided herein that supplements information found in the GENII documentation provided by the code developer. GENII is one of six computer codes designated by the DOE Office of Environmental, Safety and Health as a toolbox code for safety analysis.

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Oral Presentation Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Revised 04/01/2011 Page 1 of 2 Revised 04/01/2011 Page 1 of 2 09 ORAL PRESENTATION GUIDANCE The following guidance is not intended to replace or circumvent any existing agency-level guidance or regulation; the guidance is intended to enhance the agency's effectiveness when interviewing potential Energy Service Company (ESCOs). NOTE: Use for down selection of two or more ESCOs INSTRUCTIONS * Preplan your interview(s) * Be prepared o Decide whether to have video conference; webinar, telephonically or face-to-face interview (recommended). o Meet with the Acquisition Team (including your DOE Project Facilitator) at least one hour prior to the first ESCO interview. o Prepare questions and discussion issues based on the Team's comments and concerns. * Be brief o Recommend scheduling a 1 or 1-1/2 hour for each interview.

382

Enforcement Guidance Supplement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EGS:01-02 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 17, 2001 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 01-02: Management and Independent Assessment Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors.

383

Oral Presentation Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised 04/01/2011 Page 1 of 2 Revised 04/01/2011 Page 1 of 2 09 ORAL PRESENTATION GUIDANCE The following guidance is not intended to replace or circumvent any existing agency-level guidance or regulation; the guidance is intended to enhance the agency's effectiveness when interviewing potential Energy Service Company (ESCOs). NOTE: Use for down selection of two or more ESCOs INSTRUCTIONS * Preplan your interview(s) * Be prepared o Decide whether to have video conference; webinar, telephonically or face-to-face interview (recommended). o Meet with the Acquisition Team (including your DOE Project Facilitator) at least one hour prior to the first ESCO interview. o Prepare questions and discussion issues based on the Team's comments and concerns. * Be brief o Recommend scheduling a 1 or 1-1/2 hour for each interview.

384

DOE/EA-1861 DRAFT ENVIRONMENTAL ASSESSMENT FOR THE THE FRITO-LAY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT DRAFT ENVIRONMENTAL ASSESSMENT FOR THE THE FRITO-LAY BIOMASS BOILER PROJECT, BELOIT, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MAY 2011 DOE/EA-1861 iii May 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Assessment for the Frito-Lay Biomass Boiler Project, Beloit, Wisconsin (DOE/EA-1861) CONTACT: For more information about this Environmental Assessment (EA), please contact: Melissa Rossiter NEPA Document Manager U.S. Department of Energy Office of Energy Efficiency and Renewability Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 Facsimile: (720) 356-1560 E-mail: melissa.rossiter@go.doe.gov ABSTRACT: The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of

385

U.S. Department of Energy NEPA Lessons Learned Quarterly Report; Second Quarter FY 2003; June 2, 2003; Issue No. 35  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2003 June 2003 1 National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT Second Quarter FY 2003 June 2, 2003; Issue No. 35 LESSONS LEARNED LEARNED LESSONS Responding to Comments Is Work, But It Makes the NEPA Process Work continued on page 3 Ray Berube Retires Beverly Cook, Assistant Secretary for Environment, Safety and Health, wishes Deputy Assistant Secretary for Environment Ray Berube well on his retirement. See tribute on page 19. Considering comments received on a draft EIS, and responding to those comments appropriately in the final EIS, can be a daunting task. Even a "great" draft EIS can generate lots of public comment. At times, the process of collecting, sorting, reviewing, and responding to public comments is complex and time-consuming.

386

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California October 1999 [This page intentionally left blank.] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS CONTACT: For additional information on For general information on the NEPA this statement write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-293 Office of NEPA Policy and Assistance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW

387

DRAFT Hanford Advisory Board Handout for PIC MTG 2/6/13 DOE NEPA...  

NLE Websites -- All DOE Office Websites (Extended Search)

in the permit which utilize information from the ROD (eg. Closure Plans for TSD). CERCLA Remedial InvestigationFeasibility Study Proposed Plan Issued - Notice Issued Public...

388

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation Federal loan guarantee solicitation announcement -- Advanced Nuclear Energy Projects. Draft Advanced...

389

GRR/Section 9-FD-f - DOD NEPA Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-FD-f - DOD NEPA Process GRR/Section 9-FD-f - DOD NEPA Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-FD-f - DOD NEPA Process 09-FD-f - DOD NEPA Process (2).pdf Click to View Fullscreen Regulations & Policies 32 CFR 651 32 CFR 989 32 CFR 775 Triggers None specified Click "Edit With Form" above to add content 09-FD-f - DOD NEPA Process (2).pdf 09-FD-f - DOD NEPA Process (2).pdf 09-FD-f - DOD NEPA Process (2).pdf 09-FD-f - DOD NEPA Process (2).pdf Flowchart Narrative The National Environmental Policy Act of 1970 (NEPA) requires Federal agencies to consider the potential environmental consequences of their proposed action, and any reasonable alternatives, before deciding whether and in what form to take an action. The Council on Environmental Quality

390

The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program  

E-Print Network (OSTI)

DRAFTING TECHNOLOGY The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program offers a choice of six areas of emphasis: architectural drafting; civil drafting; information technology; mechanical and electrical drafting; process

Ickert-Bond, Steffi

391

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...  

Office of Environmental Management (EM)

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation...

392

e-NEPA Electronic Submittal of Environmental Impact Statements to EPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

e-NEPA e-NEPA Electronic Submittal of Environmental Impact Statements to EPA About e-NEPA e-NEPA is EPA's tool for submitting EIS documents electronically. The system meets EPA's requirements for EIS filing, and eliminates the need to mail hard copies of EISs to EPA. As before, to have your agency's EIS appear in EPA's Federal Register Notice of Availability, submit by 5:00 pm Eastern Standard Time on the prior Friday. Please note that using e-NEPA for filing does not affect agencies' responsibilities for public distribution of EISs. Additionally, e-NEPA registration is only open to government employees:

393

Policy Guidance Memorandum | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Guidance Memorandum Policy Guidance Memorandum Documents Available for Download POLICY GUIDANCE MEMORANDUM 12 Payment of Expenses for Professional Credentials Departmental...

394

Records and Information Management Transition Guidance (November...  

Energy Savers (EERE)

Records and Information Management Transition Guidance (November 2013) Records and Information Management Transition Guidance (November 2013) This guidance document establishes a...

395

SORN Template and Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SORN Template and Guidance SORN Template and Guidance Privacy Act System of Records Notice (PDF) System of Record Notice template with guidance in a Microsoft Word format....

396

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

s, s, DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERM INATION RECIPIENT:University of Central Florida PROJECf TITLE : Florida Hydrogen Initiative· 3 letter of Interest (LOI) Projects Page I of2 STATE: Fl Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number COP Renewal DE·FC36-04G014225 GF0-04-221e G014225 Based on my review orlbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.IA), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B 3.6 Siting. construction (or modification). operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example, preparation of chemical standards and sample analysis):

397

National Environmental Policy Act (NEPA) Categorical Exclusions (CX)  

NLE Websites -- All DOE Office Websites (Extended Search)

NEPA NEPA National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determinations CX Posting No. Project Title Posted DOE-ID-13-085 Organic Speciation and Interactions in ALSEP - One Step Partitioning Process of Minor Actinides, Lanthanides, and Fission Products - Oregon State University - 15 Kb 12/12/13 DOE-ID-13-084 Enhancement of the Extraction of Uranium from Seawater - University of Maryland - 13 Kb 12/11/13 DOE-ID-13-082 Long-Term Prediction of Emissivity of Structural Material for High Temperature Reactor Systems - University of Missouri - 13 Kb 12/10/13 DOE-ID-13-081 Innovative Elution Processes for Recovering Uranium and Transition Metals from Amidoximebased Sorbents - University of Idaho - 14 Kb 12/06/13 DOE-ID-13-080 Glass Composition and Solution Effects on Stage III Dissolution - Pennsylvania State University - 12 Kb 12/06/13

398

US. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

""'!' ""'!' US. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Office of the Govemor, Nevada Siale Office of Energy PROJECT TITLE: Program Year 2012 Formula Grants - Slate Energy Program Page 1 of2 STATE: NV Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·FOA..()()()()643 OE·EE'()()()3761 GF0-0003761-OO1 Based on my review of tbe information concerning tbe proposed action, .s NEPA Compliance Offien (authorized under DOE Order 451.IA), I have made the (ollowing determination: ex, EA, [IS APPENDIX AND NUMBER: Description: A11 Technical advice and assistance to organizations A9 Info rm ati on gathe ring, analysis, and dissemination Ralional for detennination:

399

EERE PROJECT MAN AGEMENT CENTER NEPA DETFIU.TINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RTl\IENT OF ENERGY RTl\IENT OF ENERGY EERE PROJECT MAN AGEMENT CENTER NEPA DETFIU.TINATION Page 1 of2 RECIPIENT:CT Department of Energy and Environmental Protection STATE: CT PROJECf TITLE: CONNECTICUT SEP ANNUAL PY12 Funding Opportunity Announcement Number PrCK':urement Instrument Number NEPA Control Number CID Number DE-FOA.Q000643 DE-EEOOO5301 GF0-0005301-OO 1 Based on my review of the informlltioD concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: De~ription : All Technical advice and assistance to org an izations AS InformaUo n gat herin g, analysis, and dissemi nation Rational for determination: Technical advice and planning assistance to Intemational, national

400

EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

>,RTr-lENT OF ENERGY >,RTr-lENT OF ENERGY EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION Page 1 of2 RECIPIENT:North Carolina Department of Commerce. State Energy Office STATI<:: NC PROJECT TITLE: Energy Conservation Programs in Transportation - Sandhills Community Coliege Funding Opportunity Announcement Number Procurement Instrument Number DE-EEOOOO771 NEPA Control Number GFO-OOOO771-014 em Number o Based on my review or the infonnation concerning the proposed action, as NEPA Compliance Officer (autboriud under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EERE PROJECT MANAGEMENT CENTER NEPA DETTIUlIIN .... TION PROJECT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago u.s. DEP .... RTIIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETTIUlIIN .... TION PROJECT TITLE: Chicago Climate Action Plan Advanced Transportation Technologies Initiative STATE: IL Funding Opportunity Announcement Number nla Procurement Instrument Number DE-FG3&-060860S2 NEPA Control Number GFO-G086052-001 Page 1 of2 ClD Number G086052 Based on my review oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 65.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

402

DEPARTMENT OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU.UNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENFRGY OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU.UNATION RECIPIENT:$tate of Oklahoma PROJECT TITLE : gridSMART * Public Service Company of Oklahoma Page 1 of2 STATE: OK Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOOS2 EEOOOO133 GF0-0000133-047 EE133 Based on my review of tbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.lA}.1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to oonserve energy, demonstrate potential energy oonservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

403

NEPA Lessons Learned Quarterly Report - 3rd Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1999 September 1999 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 1999 September 1, 1999; Issue No. 20 Proposed Arizona-Mexico Transmission Project Presents Challenges to NEPA Process and Analysis By: Ellen Russell, NEPA Document Manager, Fossil Energy with Carolyn Osborne, Office of NEPA Policy and Assistance continued on page 3 Fossil Energy (FE) is preparing an environmental impact statement (EIS) for what would be the first cross-border high-voltage transmission project to connect the main power delivery systems of the United States and Mexico (DOE/EIS-0307). EIS scoping has been complex. Through the scoping process, FE has identified and worked with many stakeholders to define a broad range

404

NEPA Lessons Learned Quarterly Report - 1st Quarter FY2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2000 2000 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For First Quarter FY 2000 March 1, 2000; Issue No. 22 Hanford Comprehensive Land-Use Plan EIS Helps DOE Preserve Unique Resources continued on page 4 By: Thomas W. Ferns, NEPA Document Manager, Richland Operations Office, and Yardena Mansoor, Office of NEPA Policy and Assistance A 50-year land-use plan for the Hanford Site? Some said it couldn't be done. Too many factions, they said, with irreconcilably different visions for the future. Would NEPA be a help or a hindrance in developing such a land-use plan? It turns out that the Hanford Comprehensive Land-Use Plan EIS Record of Decision (ROD) (64 FR 61615; November 12, 1999) marks the end of a successful, albeit

405

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.eU) , .eU) , u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT: Parker Hannifin, Aircraft Wheel and Brake Diy PROJECT TITl.E: Wind Turbine Electric Brake project Page 1 of2 STATE: OH Funding Opportunity Announcement Number Pro<:urement Instrument Number NEPA Control Number CID Number COP DE-EEOOOO296 GF0-10-053 0 Based on my review orthe information concerning tbe proposed action, as NEPA Compliance Officer- (autboriztd under DOE Order 4SI.1A), I have made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: B3.6 Siting. construction (or modification). operation . and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example. preparation of chemical standards and sample analysis):

406

OFFICE OF NEPA POLICY AND COMPLIANCE (EH-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision: January 24, 2012 Revision: January 24, 2012 OFFICE OF NEPA POLICY AND COMPLIANCE (GC-54) Forrestal Building, Room 3E-080 1000 Independence Avenue, SW Washington, DC 20585 Phone: 202-586-4600 Fax: 202-586-7031 Website: http://energy.gov/nepa/ Phone (202-58X-) Usual Assignments Email: firstname.lastname@hq.doe.gov Carol Borgstrom 6-4600 Director Lettie Wormley 6-4610 Secretary Eastern Energy and Waste Management Unit Brian Costner 6-9924 Unit Leader (Recovery Act Lead, Surplus Plutonium Disposition SEIS) Connie Chen 6-0733 OE, NEPA Stakeholders Directory, 10 CFR Part 1022 Yardena Mansoor 6-9326 EM (Oak Ridge, Savannah River Site), FE (Strategic Petroleum Reserve), OE, Western Area Power Administration, Lessons Learned Quarterly Report, Property

407

DEPARTM ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

u.s. u.s. DEPARTM ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Page 1 of2 STATE: PA PROJECf TITLE : Lehigh County (PA), Geothermal al Trexler Enviromenlal Center -ARRA-EECBG Funding Opportunity AnnOUReement Number DE-FOA-OOOO13 Procurement Instrument Number DE-EEOOOO9361EECBG NEPA Control Number elD Number o Based on my .-eyiew or lbe infor mation concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actIOns may involve financial and technical

408

DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAG EMENT CENTER MANAG EMENT CENTER NEPA DETERMINATION RECIPIENT:City of Philadelphia PROJECT TITLE: Ambler Boiler House Geothermal Wells, Cool Roof and PV installation Page 1 of3 STATE: PA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO148 DE-EE-0003568 GFO-OOO3568-001 0 Based on my review urthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA). I have made the follm~'ing determination: ex. EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conse rve energy or water (a) ActIons to conserve energy or water, demonstrate potential energy or water conservation, and promote energy efficiency that would not have the potential to cause significant changes in the indoor or outdoor concentrations of potentially harmful

409

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETFRMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETFRMINATION PROJECf TITLE; City of Mesa Reclamation Blower Units STATE: AZ Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elO Number DE-EE0000840 GFO-o000840-OO2 0 Based on my review of the information concerning ahe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the Indoor concentratIOns of potentially harmful substances. These actions may Involve financial and technical assistance to IndiViduals (such as builders, owners, consultants, designers), organizations (such as utilities), and slate

410

NEPA Lessons Learned Quarterly Report - 1st Quarter FY 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decisionmakers Decisionmakers States/Local Governm ents Agencies Academ icians Congress Framers of NEPA Drafters of CEQ Regs Native Am erican Tribes La wyers NGOs/ Citizen Groups Businesses Council on Environmental Quality NEPA Effectiveness Study Partners continued next page -- Improved Implementation Needed -- -- DOE Leadership Highlighted -- CEQ Study: NEPA a "Success" Overall National Environmental Policy Act N E P A U.S. Department of Energy Quarterly Report LESSONS LEARNED LESSONS LEARNED For First Quarter FY 1997 March 3, 1997 The President's Council on Environmental Quality (CEQ) issued in January the results of its extensive study on the effectiveness of the National Environmental Policy Act during the statute's 25-year history. From the cover letter by CEQ Chair Kathleen McGinty to its four short appendices, the 50-page booklet entitled The National Environmental

411

Contacts for NEPA Policy and Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Us » Contact Us » Contacts for NEPA Policy and Compliance Us » Contact Us » Contacts for NEPA Policy and Compliance Contacts for NEPA Policy and Compliance Carol Borgstrom, Director 202-586-4600 carol.borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 lettie.wormley@hq.doe.gov Eric Cohen, Supervisory Environmental Protection Specialist 202-586-7684 eric.cohen@hq.doe.gov Brian Costner, Supervisory Environmental Protection Specialist 202-586-9924 brian.costner@hq.doe.gov James (Jim) Daniel, Supervisory Environmental Protection Specialist 202-586-9760 daniel.james@hq.doe.gov Ralph Barr, Environmental Protection Specialist 202-586-3448 ralph.barr@hq.doe.gov Vivian Bowie, Environmental Protection Specialist 202-586-1771 vivian.bowie@hq.doe.gov Connie Chen, Environmental Protection Specialist 202-586-0733 connie.chen@hq.doe.gov

412

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENTCENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENTCENTER MANAGEMENTCENTER NEPA DETERMINATION RECIPIENT :T he GJosten Associates PROJECf TITLE: Offshore Wind Technology Development Page 1 of2 STATE: WA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA.Q000415 DE-EEOOO5490 GF().O(}()5490-001 0 Based on my review ofthe information concel"ning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I have made the (ollo,,"lng determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits). data analysis (indudlng, but not limited to, computer modeling), document preparation (including, but not limited to, conceptual design,

413

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Recipient: County of Clark ) 114.4- ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) County property biomass A9, All This NEPA determination is limited to conducting audits, studies, outreach and education only. Solar installation B5.1 Waste Stream Clause Historic Preservation Clause Engineering Clause Recycle cart promotion program A9, All, B5.1 Waste Stream Clause should be applied to replacement of old bins. Residential and commercial conservation A9, All This NEPA determination is limited to conducting audits, studies, outreach and education only. LED replacement for Traffic Signals B5.1 Waste Stream Clause Smart Powerstrips

414

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY Carol Borgstrom, Director 202-586-4600 Carol.Borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 Lettie.Wormley@hq.doe.gov Eastern Energy and Waste Management Unit Contact Program/Responsibility Special Projects or Topics Brian Costner Brian.Costner@hq.doe.gov 202-586-9924 Unit Leader Yardena Mansoor Yardena.Mansoor@hq.doe.gov 202-586-9326 Office of Environmental Management * Oak Ridge Office * Savannah River Operations Office Office of Fossil Energy * Strategic Reserves * Liquefied Natural Gas (LNG) Office of Electricity Delivery and Energy Reliability * Champlain Hudson Power Express Western Area Power Administration Bonneville Power Administration

415

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Recipient. _aunty of Montgomery, MD ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Home Energy Loan Program Fully Conditioned This activity is not ready for NEPA review. The loan program is still under development by the recipient and should be reviewed when the details of the program have been finalized by the recipient. Energy Conservation & Renewable Energy in County Buildings A9 This CX applies to Energy Scoping Studies, Measurement and Verification and Program Administration tasks only. All ECM/REM Funding and Buy-Down tasks are subject to further NEPA review when specific tasks have been determined by the recipient.

416

T OF ENERGY EER E PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.. .. tl.Oll u.s. DEPARTUEN T OF ENERGY EER E PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:Cook County PROJECT TITLE : EECBG- 5. Cook County Oeconstruction Program Page 1 of2 STATE: IL Funding Opportunity Announcement Number Proturement Instrument Number NEPA Control Number CID Numbu DE-EEOOOO816 0 Based on my review oftbe infonnation concerning the propoHd action, as NEPA Complian« Offif:er (authoriztd uDdu DOE Orner 451.1A).1 bave made the follOwing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

417

Property:NEPA CategoricalExclusion | Open Energy Information  

Open Energy Info (EERE)

CategoricalExclusion CategoricalExclusion Jump to: navigation, search Property Name NEPA CategoricalExclusion Property Type Page Description Files documenting Categorical Exclusion Environmental Review and Approval. Include the Extraordinary Circumstances checklist here, if available. This is a property of type Page. It links to pages that use the form NEPA_Doc. Pages using the property "NEPA CategoricalExclusion" Showing 23 pages using this property. C CA-670-2010-107 + Ormat Geothermal Drilling Permit-Well 78A-6 CX-670 2010-107.pdf + D DOE-EA-1759 + CX-002447.pdf + DOI-BLM-ID-B010-2010-0083-CX + DOI-BLM-ID-B010-2010-0083-CX Agua Caliente Sandy Spring Road ROW.pdf + DOI-BLM-NV-C010-2009-0030-CX + DOI-BLM-NV-C010-2009-0030-CX.pdf +, DOI-BLM-NV-C010-2009-0030-CX.pdf +

418

NEPA Reports and Records of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Reports and Records of Decision NEPA Reports and Records of Decision NEPA Reports and Records of Decision Report of the Review of the Hanford Solid Waste Environmental Impact Statement regarding Data Quality Control and Management Issues - As part of the litigation involving receipt of offsite waste and the HSW EIS, the Court allowed the State of Washington a limited amount of discovery pertaining to iodine-129, technetium-99, and groundwater analyses. While compiling information to respond to the State discovery request, Battelle discovered three data quality issues within the data sets used for the cumulative groundwater impact analysis: As a result of these data quality issues, a team was commissioned to review the HSW EIS for additional data quality issues as well as any programmatic problems which might have

419

DOE Annual NEPA Planning Summary report templates 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

spreadsheet headings to include the name of the program office or field organization." spreadsheet headings to include the name of the program office or field organization." "Updated 2013 APS templates (December 2012)" "Annual NEPA Planning Summary " "Environmental Assessments Ongoing or Expected to be Prepared in the Next 12 Months" "Enter the name of the reporting organization here: Program Office or Field Organization" "Enter APS report date here" "Title, Location, Document Number","Reserved For GC use","Estimated Cost","Estimated Schedule (NEPA Milestones)",,"Description (including indications of cancelled documents)" ,,,"EA Determination Date:" ,,,"Transmittal to State:" ,,,"EA Approval:"

420

Preamble: CEQ NEPA regulations (1986): Incomplete or Unavailable Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

618 618 Federal Register / Vol. 51, No. 80 / Friday, April 25, 1986 / Rules a n d Regulations - -- COUNCIL ON ENVIRONMENTAL QUALITY 40 CFR Part 1502 National Environmental Pollcy Act Regulations; Incomplete or Unavailable Information AGENCY: Council on Environmental Quality, Executive Office of the President. ACTION: Final rule. SUMMARY: The Council on Environmental Quality (CEQ) promulgates regulations, binding on all federal agencies, to implement the procedural provisions of the National Environmental Policy Act (NEPA). The regulations address the administration of the NEPA process, including preparation of environmental impact statements for major federal actions which significantly affect the quality of the human environment. On August 9 . 1985, CEQ published a proposed

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

NEPA Implementation Procedures; Appendices I, II, and III  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

_ _ _ _ _ _ _ _ ~ - Friday December 21, 1984 DOE Note: Some contact information may be outdated. Refer to the current edition of Directory o f Potential Stakeholders for Department of Energy Actions under the National Environmental Policy Act (updated annually). Part 11 Council on Environmental Quality 40 CFR Ch. V National Environmental Policy Act (NEPA) Implementation Procedures; Appendices I, II, and 111; Final Rule 49750 Federal Register I Vol. 49, No. 247 / Friday, December 21, 1984 I Rules and Regulations COUNCIL ON ENVIRONMENTAL QUALITY 40 CFRCh. V National Envircnmental Policy Act (NEPA) Implementation Procedures; Appendices I, I!, and lli AGENCY: Council on Environmental Quality, Executive Office of the President. ACTION: Appendices to regulations,

422

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Recipien, ..ounty of Westmoreland, PA ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Energy Efficiency & Conservation Programs for Buildings & Facilities All County Building Energy Audits A9 Energy Efficiency Retrofits B5.1 Waste Stream, Engineering, and Historical Preservation clauses. Energy Efficiency & Conservation Strategy A9, All, B5.1 Allowable: Any administrative actions/audits associated with this activity Prohibited: Any implantation of projects/construction activities without NEPA approval from DOE Renewable Energy Technologies on Government Buildings B5.1 Allowable: Any administrative actions/audits

423

Chicago Office NEPA Tracking Number U. S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SFCH F 560-ACQ SFCH F 560-ACQ (11/05) Previous editions are obsolete. ~1,6~.. --1 b Chicago Office NEPA Tracking Number U. S. DEPARTMENT OF ENERGY OFFICE OF SCIENCE -- CHICAGO OFFICE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) ENVIRONMENTAL EVALUATION NOTIFICATION FORM To be completed by "financial assistance award" organization receiving Federal funding. For assistance (including a point of contact), see "Instructions for Preparing SC-CH F-560, Environmental Evaluation Notification Form ". Solicitation/Award No. (if applicable): N/A Organization Name: New Brunswick Laboratory (NBL) Title of Proposed Project/Research: GENERIC CATEGORICAL EXCLUSION (CX) FOR THE NBL: Renovations and maintenance activities for buildings, structures, infrastructures and equipment

424

National Environmental Policy Act (NEPA) Categorical Exclusion (CX)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination A. Proposed Action Title: Demolition of Building 211 B. SSO NEPA Control #: SS-SC-13-01 AN#: 13011 ________________________________________________________________________ C. Brief Description of Proposed Action: SLAC proposes to demolish Building 211 located in the Research Yard. Building 211 is a 1,280 square foot mobile prefabricated steel frame modular building that is set on concrete blocks. The building was constructed in 1966. The project site is located in the southeast portion of the Research Yard that has previously been disturbed by grading and construction activities. The SLAC site has been subject to several field reconnaissance surveys by Stanford University archaeological

425

Secretarial Review Draft Environmental Assessment/  

E-Print Network (OSTI)

Secretarial Review Draft Environmental Assessment/ Regulatory Impact Review/Initial Regulatory review draft Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis Flexibility Analysis For the Arctic Fishery Management Plan And Amendment 29 to the Fishery Management Plan

426

Guidance Document Cryogenic Liquids  

E-Print Network (OSTI)

Guidance Document Cryogenic Liquids [This is a brief and general summary. Read the full MSDS for more details before handling.] Introduction: All cryogenic liquids are gases at normal temperature liquefies them. Cryogenic liquids are kept in the liquid state at very low temperatures. Cryogenic liquids

427

Engineering Library Guidance  

E-Print Network (OSTI)

Science & Engineering Library Library Guidance April 2014 1 #12;Contents 1 Overview of Waseda University Library 2 Science & Engineering Library and the Student Reading Room 3 WINE: Waseda's Library Catalog3 WINE: Waseda's Library Catalog 4 Library Services 5 Notes 2 #12;How many libraries

Kaji, Hajime

428

Regulatory guidance document  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM`s evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7.

NONE

1994-05-01T23:59:59.000Z

429

EA-1906: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

430

Building Energy Use Benchmarking Guidance  

Energy.gov (U.S. Department of Energy (DOE))

Guidance describes the Energy Independence and Security Act of 2007 section 432 requirement for benchmarking Federal facilities.

431

Transmission line environmental assessment guidance document  

SciTech Connect

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

432

http://www.eh.doe.gov/nepa/process/ll/95q3.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3RD 3RD QUARTER FY 1995 Office of NEPA Policy and Assistance U.S. Department of Energy September 1, 1995 INTRODUCTION To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment, Safety and Health to solicit comments on lessons learned in the process of completing NEPA documents from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement (EIS) and environmental assessment (EA), and to distribute a quarterly summary to all NEPA Compliance Officers and NEPA Document Managers. This quarterly report summarizes the lessons learned for documents completed between April 1 and June

433

NEPA Lessons Learned Quarterly Report September 2001, No. 27, Third Quarter FY 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA NEPA Lessons Lear ned September 2001 1 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Third Quarter FY 2001 September 4, 2001; Issue No. 28 continued on page 2 NEPA Compliance Officers Consider Further Improvements "What's New, What's Next," was the theme of the Department of Energy (DOE) NEPA Compliance Officers (NCOs) meeting on June 13 and 14, 2001, in Washington, DC. Convened by the Office of NEPA Policy and Compliance, the meeting involved 70 participants including Program and Field Office NCOs, Headquarters NEPA attorneys, and others. In welcoming participants, Carol Borgstrom, Director, Office of NEPA Policy and Compliance, recounted recent goals for DOE's NEPA Compliance Program before considering new challenges. She noted that in the 1990s, the Department achieved significant improvements

434

http://www.eh.doe.gov/nepa/process/ll/95q4.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4TH 4TH QUARTER FY 1995 Office of NEPA Policy and Assistance U.S. Department of Energy December 1, 1995 INTRODUCTION To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment, Safety and Health to solicit comments on lessons learned in the process of completing NEPA documents from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement (EIS) and environmental assessment (EA), and to distribute a quarterly summary to all NEPA Compliance Officers and NEPA Document Managers. This quarterly report summarizes the lessons learned for documents completed between July 1 and

435

GRR/Section 9-FD-e - DOE NEPA Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-FD-e - DOE NEPA Process GRR/Section 9-FD-e - DOE NEPA Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-FD-e - DOE NEPA Process 09-FD-e - DOE NEPA Process.pdf Click to View Fullscreen Contact Agencies Department of Energy Council on Environmental Quality United States Environmental Protection Agency Regulations & Policies National Environmental Policy Act 10 CFR § 1021 - DOE NEPA Regulations Triggers None specified Click "Edit With Form" above to add content 09-FD-e - DOE NEPA Process.pdf 09-FD-e - DOE NEPA Process.pdf 09-FD-e - DOE NEPA Process.pdf Error creating thumbnail: Page number not in range. Flowchart Narrative Whenever the Department of Energy (DOE) considers funding, licensing, or

436

Guidance for Environmental Mangement Science and Technology Roadmapping  

SciTech Connect

Science and technology roadmapping is a planning process to help identify technical capabilities needed for both project- and program-level cleanup efforts, map them into technology alternatives, and develop plans to ensure that the required scientific knowledge and tools will be available when needed. Application of science and technology roadmapping within Invironmental Management (EM) requires significant flexibility to accommodate the variations between different projects and programs and the different levels of roadmapping application. The author has provided direct support to EMs Office of Science and Technology (OST) in the development of draft guidance for science and technology roadmapping in EM. This paper provides a summary of this guidance and a synopsis of lessons learned from the application of roadmapping to a number of EM projects and programs.

Dixon, Brent Wayne

2001-02-01T23:59:59.000Z

437

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

438

Funded Projects NEPA Does Not Apply Categorical Exclusions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 30, 2010 June 30, 2010 Page 1 # of ARRA Funded Projects NEPA Does Not Apply Categorical Exclusions (CE) CE Pending CE Done Environmental Assessments (EA) EA Pending EA Done Environmental Impact Statements (EIS) EIS Pending EIS Done All NEPA Actions All Withdrawn Actions All Pending NEPA Actions All Completed NEPA Actions OVERALL TOTALS: 215,159 4,240 175,498 821 174,677 9,808 749 9,059 829 36 793 186,135 1,403 1,606 184,529 Department of Agriculture (USDA): 132,570 254 93,586 37 93,549 1,303 3 1,300 150 0 150 95,039 110 40 94,999 Agricultural Research Service (ARS) 41 2 38 0 38 1 0 1 0 0 0 39 0 0 39 Farm Service Agency (FSA) 38,592 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Food and Nutrition Service (FNS) 251 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Foreign Agricultural Service (FAS) 3 0 3 0 3 0 0 0 0 0 0 3 0 0 3 U.S. Forest Service (USFS) 705 252 1,408 2 1,406 533 1 532 121 0 121 2,062 8 3 2,059 Natural Resources Conservation Service (NRCS)

439

Property:NEPA DNA Worksheet | Open Energy Information  

Open Energy Info (EERE)

DNA Worksheet DNA Worksheet Jump to: navigation, search Property Name NEPA DNA Worksheet Property Type Page Description DNA Worksheet files for NEPA Docs. This is a property of type Page. It links to pages that use the form NEPA_Doc. Pages using the property "NEPA DNA Worksheet" Showing 19 pages using this property. D DOI-BLM-NV-C010-2011-0517-DNA + DOI-BLM-NV-C010-2011-0517-DNA.pdf + DOI-BLM-NV-C010-2012--044-DNA + DOI-BLM-NV-C010-2012-0044-DNA.pdf + DOI-BLM-NV-C010-2012-0005-DNA + DOI-BLM-NV-C010-2012-0005-DNA.pdf + DOI-BLM-NV-C010-2012-0016-DNA + DOI-BLM-NV-C010-2012-0016-DNA.pdf + DOI-BLM-NV-C010-2012-0019-DNA + DOI-BLM-NV-C010-2012-0019-DNA.pdf + DOI-BLM-NV-C010-2012-0020-DNA + DOI-BLM-NV-C010-2012-0020-DNA.pdf + DOI-BLM-NV-C010-2012-0028-DNA + DOI-BLM-NV-C010-2012-0028-DNA.pdf +

440

Funded Projects NEPA Does Not Apply Categorical Exclusions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 31, 2010 December 31, 2010 Page 1 # of ARRA Funded Projects NEPA Does Not Apply Categorical Exclusions (CE) CE Pending CE Done Environmental Assessments (EA) EA Pending EA Done Environmental Impact Statements (EIS) EIS Pending EIS Done All NEPA Actions All Withdrawn Actions All Pending NEPA Actions All Completed NEPA Actions OVERALL TOTALS: 272,037 4,289 181,061 190 180,871 6,978 362 6,616 870 35 835 188,909 1,674 589 188,322 Department of Agriculture (USDA): 184,065 254 96,907 9 96,898 1,508 0 1,508 150 0 150 98,565 254 9 98,556 Agricultural Research Service (ARS) 41 2 38 0 38 1 0 1 0 0 0 39 0 0 39 Farm Service Agency (FSA) 86,564 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Food and Nutrition Service (FNS) 251 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Foreign Agricultural Service (FAS) 3 0 4 0 4 0 0 0 0 0 0 4 0 0 4 U.S. Forest Service (USFS) 705 252 1,408 0 1,408 533 0 533 121 0 121 2,062 8 0 2,062 Natural Resources Conservation Service (NRCS)

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Property:NEPA SerialRegisterPage | Open Energy Information  

Open Energy Info (EERE)

SerialRegisterPage SerialRegisterPage Jump to: navigation, search Property Name NEPA SerialRegisterPage Property Type Page Description Serial Register Page files for NEPA Docs. Related Serial Register Pages from BLM's LR2000 (http://www.blm.gov/lr2000/ This is a property of type Page. It links to pages that use the form NEPA_Doc. Pages using the property "NEPA SerialRegisterPage" Showing 25 pages using this property. (previous 25) (next 25) D DOI-BLM-ID-B010-2010-0083-CX + IDI-036765 + DOI-BLM-NV-063-EA08-091 + NVN-087409-SRP-ROW-Transmission.pdf +, NVN-083483X-NOI-Unit.pdf +, NVN-083484X-SRP-UNIT.pdf + DOI-BLM-NV-B010-2011-0015-EA + NVN-084268X-SRP-Unit.pdf + DOI-BLM-NV-B020-2011-0017-CX + File:NVN-089289.pdf + DOI-BLM-NV-B020-2011-0026-EA + NVN-089376X-SRP-UNIT.pdf +

442

Examples of Benefits from the NEPA process for ARRA funded activities  

Energy.gov (U.S. Department of Energy (DOE))

Efforts to implement the American Recovery and Reinvestment Act of 2009 (ARRA) include ensuring, and reporting on, timely NEPA reviews prepared in support of projects and activities funded under major provisions of ARRA. In addition to reporting on the status of the NEPA environmental reviews, agencies also report on the benefits of NEPA.

443

Maiden Wind Farm, Final NEPA/SEPA Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 West Rose St. Ste. 400 6 West Rose St. Ste. 400 Walla Walla, WA 99362 -1870 POWER BUSINESS LINE January 3, 2003 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm Bonneville Power Administration and Benton County have completed the Final Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, a copy of the Final EIS is enclosed. The abbreviated Final EIS is made up of three parts: 1) a brief introduction and summary of the project and the EIS process; 2) changes and corrections to be made to the Draft EIS to make it final; and 3) comments received on the Draft EIS and responses to them. Since the changes and corrections to the Draft EIS are relatively minor, we have chosen to just print

444

EPAct 2005 Metering Guidance Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPAct 2005 Metering Guidance EPAct 2005 Metering Guidance Overview Dave Hunt Pacific Northwest National Laboratory Section 103 Requirements * What to meter - Building electric usage - All buildings * How to meter - Standard meters - Advanced meters * When - by 10/1/2012 FEMP's Response * Metering guidance document * Agency planning workshops * Metering training course * Metering Best Practices Guide (FY 2007) Important Dates * August 3, 2006 - agency plans due * As determined by individual agencies - site metering plans * October 1, 2012 - compliance deadline Issues * Funding * Practicability * EPAct time-based rate schedule * Agency policies/guidance Potential Roles for Utilities * Guidance/updates on time-based pricing * Metering services * Finance installations * Other? Useful Documents

445

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONSIBLE AGENCY: United States Department of Energy (DOE) RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE/EIS-0396) CONTACT: For further information on this PEIS, For general information on the DOE National write or call: Environmental Policy Act (NEPA) process, write or call: Mr. Francis Schwartz Carol Borgstrom, Director GNEP PEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Office of Nuclear Energy, NE-5 U.S. Department of Energy U.S. Department of Energy 1000 Independence Avenue, SW 1000 Independence Avenue, SW Washington, DC 20585 Washington, DC 20585 (202) 586-4600 (866) 645-7803 or leave a message at 1-800-472-2756 Abstract: The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the

446

Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

447

United States Forest Service - Forest Service NEPA Procedures...  

Open Energy Info (EERE)

windex.php?titleUnitedStatesForestService-ForestServiceNEPAProceduresandGuidance&oldid793474" Categories: References Geothermal References Solar References Utilities...

448

Sacramento Area Voltage Support Draft Environmental Impact Statement  

SciTech Connect

The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

N /A

2002-11-15T23:59:59.000Z

449

Accelerating Cleanup: Focus on 2006. Discussion draft  

SciTech Connect

This executive summary addresses the activities associated with the National Transuranic (TRU) Program managed by the Carlsbad Area Office (CAO). The CAO programmatically reports to the Assistant Secretary for Environmental Management and receives administrative support through the Albuquerque Operations Office. The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant for site disposal of TRU waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to the CAO, the Waste Isolation Pilot Plant (WIPP) site operations, and other activities associated with the National TRU Program. The CAO develops and directs implementation of the program, while the DOE Headquarters establishes policy and guidelines. The CAO assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all the sites. Since the development of the February 28, 1997, database used to develop this Discussion Draft, the opening of the WIPP facility for receipt of Contact Handled waste has been delayed from November 1997 to May 1998. This slippage is significant enough to require a change in the milestones and volumes included in the documents to be reviewed by our stakeholders. Changes have been incorporated into this Discussion Draft and its supporting Project Baseline Summaries (PBSs).

None

1997-06-01T23:59:59.000Z

450

Guidance on purpose and need; letters between CEQ and DOT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SECRETARY OF TRANSPORTATION SECRETARY OF TRANSPORTATION WASHINGTON, D.C. 20590 May 6, 2003 The Honorable James Connaughton Chairman, Council on Environmental Quality 722 Jackson Place, NW Washington, D.C. 20503 Dear Mr. Connaughton: As Chairman of the Interagency Transportation Infrastructure Streamlining Task Force established by Executive Order 13274, I am seeking your guidance on an important issue that has significant implications for our ability to carry out the President's mandate to promote environmental stewardship and streamline environmental reviews on the Nation's transportation infrastructure projects. As you are aware, under the National Environmental Policy Act of 1969 (NEPA), the "purpose and need" for a project is a critical element in the environmental review process. It explains the

451

Weatherization and Intergovernmental Program: Closeout Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Guidance Program Guidance Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: Closeout Guidance to someone by E-mail Share Weatherization and Intergovernmental Program: Closeout Guidance on Facebook Tweet about Weatherization and Intergovernmental Program: Closeout Guidance on Twitter Bookmark Weatherization and Intergovernmental Program: Closeout Guidance on Google Bookmark Weatherization and Intergovernmental Program: Closeout Guidance on Delicious Rank Weatherization and Intergovernmental Program: Closeout Guidance on Digg Find More places to share Weatherization and Intergovernmental Program: Closeout Guidance on AddThis.com... Closeout Guidance Recovery Act Monitoring & Reporting National Environmental Policy Act

452

Federal Energy Management Program: Energy Management Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Energy Management Guidance to someone by E-mail Share Federal Energy Management Program: Energy Management Guidance on Facebook Tweet about Federal Energy Management Program: Energy Management Guidance on Twitter Bookmark Federal Energy Management Program: Energy Management Guidance on Google Bookmark Federal Energy Management Program: Energy Management Guidance on Delicious Rank Federal Energy Management Program: Energy Management Guidance on Digg Find More places to share Federal Energy Management Program: Energy Management Guidance on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules Guidance Facility Reporting Fleet Reporting Energy Management Guidance The Federal Energy Management Program (FEMP) provides guidance on Federal

453

Weatherization and Intergovernmental Program: Program Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Guidance Program Guidance Site Map Printable Version Share this resource Send a link to Weatherization and Intergovernmental Program: Program Guidance to someone by E-mail Share Weatherization and Intergovernmental Program: Program Guidance on Facebook Tweet about Weatherization and Intergovernmental Program: Program Guidance on Twitter Bookmark Weatherization and Intergovernmental Program: Program Guidance on Google Bookmark Weatherization and Intergovernmental Program: Program Guidance on Delicious Rank Weatherization and Intergovernmental Program: Program Guidance on Digg Find More places to share Weatherization and Intergovernmental Program: Program Guidance on AddThis.com... Closeout Guidance Recovery Act Monitoring & Reporting National Environmental Policy Act

454

Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement 03-01 Supplemental Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 Enforcement Guidance Supplement 03-01 Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 In October 2000, the Office of Price-Anderson Enforcement (OE) issued Enforcement Guidance Supplement (EGS) 00-04, "Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR subpart C." That EGS, in part, delineated a set of criteria that OE would use to determine whether to apply its enforcement discretion, in this case through the use of Consent Orders. Those criteria provided both guidance to DOE contractors regarding situations for which the use of

455

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY S-1 SUMMARY This environmental impact statement (EIS) has been prepared by the United States Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement manufacturing facility (the "Co- Production Facility"). The responsible organization for the federal action is the National Energy Technology Laboratory (NETL), a multi-purpose laboratory owned and operated by DOE. Proposed Action The Proposed Action is for DOE to decide whether to provide financial assistance to Western

456

RESPONSES TO PUBLIC AND AGENCY COMMENTS ON THE DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONSES TO PUBLIC AND AGENCY COMMENTS RESPONSES TO PUBLIC AND AGENCY COMMENTS ON THE DRAFT ENVIRONMENTAL ASSESSMENT FOR LEASE OF LAND AND FACILITIES AT THE EAST TENNESSEE TECENOLOGY PARK OAK RIDGE,TENNESSEE @OE/EA-1175) NOVEMBER 1997. U.S. DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE OAK RIDGE, TENNESSEE [blank page] CONTENTS 1 1 . INTRODUCTION ................................................................ 1 2. SCOPE AND ORGANIZATIONS ................................................... 3 3. COMMENTS AND RESPONSES .i ................................................. 5 3.1 DOE NEPA Review Process/Categorical Exclusions .............................. 5 3.1.1 SummaryofComments ............................................... 5 3.1.2 Response/Revisions .................................................. 5

457

http://www.eh.doe.gov/nepa/process/ll/95q2.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2ND 2ND QUARTER FY 1995 Office of NEPA Policy and Assistance U.S. Department of Energy June 1, 1995 INTRODUCTION To foster continuing improvement of the Department's National Environmental Policy Act (NEPA) compliance program, the Secretarial Policy Statement on NEPA, issued June 13, 1994, requires the Office of Environment, Safety and Health to solicit comments from the NEPA Document Manager, the NEPA Compliance Officer, and team members after completing each environmental impact statement and environmental assessment on lessons learned in the process, and to distribute a quarterly summary to all NEPA Compliance Officers and NEPA Document Managers. This quarterly report summarizes the lessons learned for documents completed between January 1 and March 31, 1995. It is based primarily on responses to the revised questionnaire that was

458

September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29-11 Draft 29-11 Draft Collaboration provides an opportunity to serve as an entity that is greater than the sum of its parts. HSS FOCUS GROUP DRAFT PROPOSED WORK GROUP GUIDANCE BACKGROUND: The HSS Focus Group provides a forum for communication and collaboration related to worker health, safety and security among HSS management and staff, labor unions, DOE Programs and stakeholders. Based on the foundation that labor union representatives are an essential source of frontline perspective in identifying, addressing and resolving worker health, safety and security concerns, the Focus Group has served to open lines of communication with worker representatives and provides a vehicle for information exchange, problem solving, building relationships and trust,

459

Draft Tomato Product Processing Plant EPI | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Tomato Product Processing Plant EPI Draft Tomato Product Processing Plant EPI Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories

460

Commissioning Guidance for ESPCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.2 7.2 Commissioning Guide Commissioning Guidance for ESPCs INTRODUCTION Federal facility managers are challenged daily with maintaining existing federal building stock that is energy inefficient, requires increasing operations and maintenance (O&M) expenses, and often does not achieve the building occupant comfort needed to maintain worker productivity. Additionally, they are faced with congressionally mandated requirements to reduce energy use and O&M expenses, with little capital funding. The Super ESPC program provides a procurement mechanism to allow agencies to acquire performance-based services to implement energy efficient equipment and systems that reduce energy use and O&M expenses through projects designed, installed, financed, and

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Policy and Guidance Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection, Sustainability Support & Corporate Safety Analysis Environmental Protection, Sustainability Support & Corporate Safety Analysis HS-20 Home Mission & Functions » Office of Nuclear Safety, Quality Assurance & Environment » Sustainability Support » Environmental Policy & Assistance » Corporate Safety Programs » Analysis Program Contacts What's New? Sustainability Support Environment Corporate Safety Programs Analysis Environment Environmental Policy Environmental Guidance Environmental Reports Environmental Management System Radiation Protection Environmental Compliance Environmental Justice Environmental Training Environmental Tools Search Our Documents Topics & Resources Air Analytical Services Program CERCLA Cultural & Natural Resources DOE Comments on Rulemakings Federal Environmental Laws

462

Federal Real Property Council Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Real Property Council Federal Real Property Council Guidance for Improved Asset Management December 22, 2004 Federal Real Property Council Guidance for Improved Asset Management Table of Contents I. Overview............................................................................. 1 II. Guiding Principles .................................................................... 3 III. Asset Management Plan - Required Components............................... 4 IV. Asset Management Plan - "Shelf Document".................................. 5 V. Inventory Data Elements and Performance Measures Definitions.......... 26 i Federal Real Property Council Guidance for Improved Asset Management I. Overview On February 4, 2004, President Bush signed Executive Order 13327, "Federal Real Property

463

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

464

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Recipient: County of Hidalgo, Texas 12 Recipient: County of Hidalgo, Texas ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Reviewer's Specific Instructions and Categorical Exclusion Rationale (Restrictions and Allowable Activity) Activity 1 - Sunset Park 85.1 Waste St ream Clause Efficient Ught Project **This NEPA determination applies to the LED light project only. Activity 2 - Hidalgo County, 85.1 Waste Stream Clause Pct 2 Multipurpose Building Historic Preservation Clause Renewable Energy Engineering Clause Component Activity 3 - Solar Power 85.1 Waste Stream Clause Retrofit of Multi-Purpose Historic Preservation Clause Facilities Engineering Clause Activity 4 - Energy Efficiency 85.1 Waste Stream Clause and Conservation Through Historic Preservation Clause

465

EPA's Section 309 Review: The Clean Air Act and NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection Agency Environmental Protection Agency Office of Enforcement and Compliance Assurance July, 1999 EPA's Section 309 Review: The Clean Air Act and NEPA Office of Federal Activities (2251A) Quick Reference Brochure ENVIRONMENTAL REVIEW AND THE CLEAN AIR ACT The Clean Air Act, a law to prevent pollution of a single environmental medium, contains an unusual provision. T h a t provision is Section 309, which authorizes the Environmental Protection Agency (EPA) to review certain proposed actions of other federal agencies in accordance with the National Environmental Policy Act (NEPA) and to make those reviews public. If the proposing agency (the "lead" agency) does not make sufficient revisions and the project remains environmentally unsatisfactory. EPA may refer the matter to the President's Council on Environmental Quality for

466

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Recipient: county of Monterey, CA ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Retrofit on and off road vehicles with diesel particulate trap filters B5.1 Waste Stream clause Installation of PV system to Serve County of Monterey Laurel Yard Facilities A9, All This activity is conditioned pending further NEPA review. Greenhouse Gas Inventory and Tracking System A9, All None. EE Ordinance and Incentive Development A9, All None. Investment Grade Energy Audit for County Facilities A9, All, B5.1 Waste Stream Clause Historic Preservation Clause Engineering Clause Public EE Education Program A9, All None. Additional Comments: Based on my review of information conveyed to me and in my possession (or attached) concerning the

467

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Carolina Department of Commerce, Stale Energy Office North Carolina Department of Commerce, Stale Energy Office Page 1 of2 STATE: NC PROJECT TITLE: Energy Conservation Programs in Transportation· Westem Piedmont Community College Funding Opportunity Announttmenf Number PrIK:urement Instrument Number NEPA Control Number CID Numbtr DE-EEOOOO771 GF~771-017 0 Based on my review ofthe Information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

468

DEPARTMENT OF ENERGY EERE PROJECT MAN AGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Navigant Consulting PROJECT TITLE: Offshore Wind Removing Market Barriers Page 1 of2 STATE: MA Funding Opportunity AnnouncemeDt Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-0000414, topic area 3 DE· EEOOO5364 GF0-0005364-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathenng (including, but not limited 10, literature surveys, Inventories, site visits, and audits), data analysis (indudlnQ, but Dot limited to, computer modeling). document preparation (including, but not limited to, conceptual design,

469

National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA) Categorical Exclusion (CX) Determination for NEPA) Categorical Exclusion (CX) Determination for the Addition of a Temporary Locker Facility to the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee (CX-TWPC-IO-0002) The U.S. Department of Energy (DOE) Oak Ridge Office (ORO) proposes to install a temporary modular locker facility which would be utilized as a change house for scrubs/dress out only (no restroom or shower facilities would be provided). The TWPC function is to prepare wastes stored at the Oak Ridge National Laboratory (ORNL) for offsite disposal primarily at the Waste Isolation Pilot Plant (WIPP) and/or the Nevada Test Site (NTS). The proposed action would utilize the current TWPC facility and equipment at a developed site with active utilities and readily accessible roads. The scope of work proposed includes

470

CEQ Regulations for Implementing the Procedural Provisions of NEPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Office of the President Executive Office of the President REGULATIONS For Implementing The Procedural Provisions Of The NATIONAL ENVIRONMENTAL POLICY ACT Reprint 40 CFR Parts 1500-1508 (2005) This page is blank (inside front cover) TABLE OF CONTENTS PART 1500-PURPOSE, POLICY AND MANDATE Sec. 1500.1 Purpose. 1500.2 Policy. 1500.3 Mandate. 1500.4 Reducing paperwork. 1500.5 Reducing delay. 1500.6 Agency authority. PART 1501-NEPA AND AGENCY PLANNING Sec. 1501.1 Purpose. 1501.2 Apply NEPA early in the process. 1501.3 When to prepare an environmental assessment. 1501.4 Whether to prepare an environmental impact statement. 1501.5 Lead agencies. 1501.6 Cooperating agencies. 1501.7 Scoping. 1501.8 Time limits. PART 1502-ENVIRONMENTAL IMPACT STATEMENT Sec. 1502.1 Purpose. 1502.2 Implementation. 1502.3 Statutory requirements for statements.

471

Chicago Office NEPA Tracking Number U. S. DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SGCH F 560-ACQ SGCH F 560-ACQ (11/05) Previous editions are obsolete. Chicago Office NEPA Tracking Number U. S. DEPARTMENT OF ENERGY OFFICE OF SCIENCE -- CHICAGO OFFICE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) ENVIRONMENTAL EVALUATION NOTIFICATION FORM To be completed by "financial assistance award" organization receiving Federal funding. For assistance (including a point of contact), see "Instructions for Preparing SC-CH F-560, Environmental Evaluation Notification Form ". Solicitation/Award No. (if applicable): N/A Organization Name: New Brunswick Laboratory (NBL) Title of Proposed Project/Research: GENERIC CATEGORICAL EXCLUSION (CX) FOR THE NBL: Indoor Bench Scale Research Projects and Conventional Laboratory Operations Total DOE Funding/Total Project Funding:

472

US DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETERMINATION DETERMINATION RECIPIENT: Minnesota Department of Commerce, Office of Energy Security SEP ARRA EE000164 PROJECT TITLE: SEP Residential Ground Source Heat Pump Installations (6 ) Page I of2 STATE: MN Funding Opportunity Announcement Number PrlXurement Instrument Number NEPA Control Number CID Number DE FOA 0000052 DE-EEOOOO164 GF()-()(HX)164.{)1 1 EE164 Based on my review of the Information concerning tbe proposed action, as NEPA Compliance OtrKer (authorized under DOE Order 4S1.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservatiofl, and promote energy-efficiency that do not increase the indoof' concentratiofls of potentially harmful substances. These actions may involve fi

473

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0847 0847 Recipient: City of .viadison, WI ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) LED Street Lights B2.5 B5.1 Waste Stream Clause *Replacement of existing fixtures to EE lighting. Anaerobic Food Waste Digester - Pilot Study A9 All C12 *This NEPA determination is limited to conducting the waste stream study, feasibility study and preliminary engineering for an Anaerobic Food Waste Digester facility only. *Recipient needs to provide technical and site specific information for this activity. *Allowable: Any administrative actions associated with this activity. Prohibited: Any implementation of projects/construction activities without

474

NEPA Lessons Learned Quarterly Report - 4th Quarter FY 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1999 December 1999 1 continued on page 3 LESSONS LEARNED LEARNED LESSONS National Environmental Policy Act N E P A U.S. DEPARTMENT OF ENERGY QUARTERLY REPORT For Fourth Quarter FY 1999 December 1, 1999; Issue No. 21 Good Information, Good Government Using Technology to Improve NEPA Decisionmaking provides a comprehensive guide to Federal environmental information resources available electronically and to useful Web sites provided by nongovernmental groups and professional organizations. “One of the foundations of good government is good information,” President Clinton observed. NEPA is “at its core, a mandate for informed, democratic decisionmaking. And its contribution to environmental protection is incalculable.” Managing a National Public Participation

475

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

476

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oregon Department of Energy Oregon Department of Energy Page 1 of2 STATE: OR PROJECf TITLE: Oregon Energy Efficiency and Conservation Block Grant· Formula-EECBG: video conferencing Funding Opportunity Announcement Number PnKurcmenl Instrument Number NEPA Control Numfrer em Number DE·FOA-OOOOO13 DE-EE0000926 EEO Based on my review of the information concerning the proposed acuon, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 81 .7 Acquisition. installation. operation, and removal of communication systems, data processing equipment, and similar electronic equipment. 85.1 Actions to conselVe energy. demonstrate potential energy conservation, and promote energy-efficiency that do not

477

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECIPI[NT:Abengoa Solar Inc. RECIPI[NT:Abengoa Solar Inc. Page 1 of2 STATE: CO PROJECf TITLE: Development of Molten-Salt Heat TRansfer Fluid Technology for Parabolic Trough Solar Pow-er Plants Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FC36-08GOl8038 GFO-GOl 8038-003 0 Based on my uview oftbe information concerning the proposed action, liS NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A91nformation gathering, analysis, and dissemination InformatIOn gathering (including. but not limited to, literature surveys, inventories, site visits. and audits). data analysis (including, but not limited 10, oomputer modeling), document preparation (including, but not limited to, oonceptual design,

478

EERE PROJECT MANAG EMDITCENTER NEPA D:ETERl\IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENERC. OFENERC. EERE PROJECT MANAG EMDITCENTER NEPA D:ETERl\IINATION Page I of2 RECIPIENT :University of Utah STATE: ur PROJECT TITLE : Novel Photon Management for Thin-Film Photovoltaics Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-EEOOO5959 GFO-OO05959-001 Based on my review of the information concerning the proposed action, as N[PA Compliance Officer (authorized under DOE Order 451.1A), I ha ve made the following determination: ex, EA, EIS APPENDIX AND NUMBER : Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but nollimiled 10, literature surveys, inventories, site visits, and audits), data analysis (including. bul nollimited 10, computer modeling), document preparation

479

DEPARTMENT OF ENERGY EERE PROJECT MAN AGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Garrad Hassan America Garrad Hassan America PROJECT TITLE: Optimized Ports Assessment Page 1 of2 STATE: OR Funding Opportunity Announcement Number Pro<:urement Instrument Number NEPA Control Number em Number DE-FOA-Q000414 DE-EE0005369 GFO-OOO5369-001 EE5369 Based on my review orlbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Inform at ion gatheri ng, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits). data analysis (including, but not limited 10, computer modeling). document preparation (including, but not limited to, conceptual design,

480

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northampton County Northampton County PROJECT TITLE: Roof replacement/repair, gutters. downspouts, Page 1 of2 STATE: PA Funding Opportunity AnnQuntcmcnt Number Procurement Instrument Numbu NEPA Control Numbu elo Number EE0000939 GF0-000Q939-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance OMcu (authorized under- DOE Order 451.1 A), I have made the following determination: ex. EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

Note: This page contains sample records for the topic "draft nepa guidance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maryland Energy Administration Maryland Energy Administration PROJECT TITLE : State Energy Program 2012 Formula Gr;:mt Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-0000643 DE-EEOOOO283 GF0-0000283-OO1 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order451.1A), I ha ve made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and assistance to organizations Technical advice and planning assistance to international, national, slale, and local organizations. A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to. literature surveys, inventories. site visits, and

482

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECIPIENT RECIPIENT :Ohio Office of Energy Page 1 of2 STATE : OH PROJECT TITLE: Ohio State ARRA·EECBG· Act 1 (Non-entitlement Grants) City of Powell Solar PV Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-CKlOOO13 DE-EEOOOO714.006 GF0-0000714-Q06 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5. 16 So lar phot ovoltaic systems The installation, modification, operation, and removal of commercially available solar photovoltaic systems located on a building or other structure (such as rooftop, parking lot or facility , and mounted to signage, lighting, gates, or fences), or if

483

O&M Metering Guidance  

Energy.gov (U.S. Department of Energy (DOE))

Presentation covers the O&M Metering Guidance and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

484

NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems In this article, the former General Counsel of the Council on Environmental Quality, outlines NEPA's purposes, scope, and implementation procedures. She describes current issues in NEPA practice and policy, and observes that NEPA has continuing vitality in the context of a new generation of environmental concerns. NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems More Documents & Publications A Citizen's Guide to the NEPA: Having Your Voice Heard Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA EPA's Section 309 Review: The Clean Air Act and NEPA

485

DOE Annual NEPA Planning Summary report templates 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management" Office of Legacy Management" "Enter APS report date here" "Title, Location, Document Number","Reserved For GC use","Estimated Cost","Estimated Schedule (NEPA Milestones)",,"Description" "N/A",,,"EA Determination Date:" ,,,"Transmittal to State:" ,,,"EA Approval:" ,,,"FONSI:" ,,,"EA Determination Date:" ,,,"Transmittal to State:" ,,,"EA Approval:" ,,,"FONSI:" ,,,"EA Determination Date:" ,,,"Transmittal to State:" ,,,"EA Approval:" ,,,"FONSI:" ,,,"EA Determination Date:" ,,,"Transmittal to State:" ,,,"EA Approval:" ,,,"FONSI:"

486

Property:NEPA Application Type | Open Energy Information  

Open Energy Info (EERE)

NEPA Application Type NEPA Application Type Property Type String Allows Values NOI;GPD;POO;POU;POD;ROW;Sundry Notice Pages using the property "NEPA Application Type" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + POO +, POU +, POD +, ... C CA-017-05-051 + GPD +, ROW + CA-170-02-15 + GPD + CA-670-2010-107 + GPD + CA-670-2010-CX + NOI + CA-96062042 + POU + D DOE-EA-1733 + POU + DOE-EIS-0298 + NOI + DOI-BLM-CA-ES-2013-002+1793-EIS + POO +, POU +, POD + DOI-BLM-ID-220-2009-EA-3709 + GPD + DOI-BLM-ID-B010-2010-0083-CX + ROW + DOI-BLM-NM-L000-2012-0020-DNA + Sundry Notice + DOI-BLM-NM-L000-2012-0042-DNA + Sundry Notice + DOI-BLM-NM-L000-2012-0111-DNA + GPD + DOI-BLM-NM-L000-2012-0200-DNA + GPD + DOI-BLM-NV-063-EA08-091 + GPD +, POO +, POU +

487

Property:NEPA Resource Comment | Open Energy Information  

Open Energy Info (EERE)

Comment Comment Jump to: navigation, search Property Name NEPA Resource Comment Property Type Text Description Comment on the analysis of a potential impact to a NEPA resource Subproperties This property has the following 4 subproperties: D DOI-BLM-NV-063-EA08-091#NEPAImpact_with_Wild_Horse_and_Burro_Management DOI-BLM-NV-063-EA08-091#NEPAImpact_with_Recreation DOI-BLM-NV-063-EA08-091 DOI-BLM-NV-063-EA08-091#NEPAImpact_with_Paleontological_Resources Pages using the property "NEPA Resource Comment" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Prime_or_Unique_Farmlands + The proposed project is not located in or near any prime or unique farmlands (BLM WFO 2002). BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Wilderness + The proposed project is not in or adjacent to any wilderness area (BLM WFO 2002).

488

Property:NEPA Resource Applicant Mitigation | Open Energy Information  

Open Energy Info (EERE)

Resource Applicant Mitigation Resource Applicant Mitigation Jump to: navigation, search Property Name NEPA Resource Applicant Mitigation Property Type Text Description Applicant proposed mitigation plan to minimize the risk of a potential negative impact to a NEPA resource with a geothermal development effort. Pages using the property "NEPA Resource Applicant Mitigation" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Noise + Construction noise would be minimized through practices which avoid or minimize actions which may typically generate greater noise levels, or generate distinctive impact noise. BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Air_Quality + Water would be applied to the ground during the construction and utilization of the drill pads, access roads, and other disturbed areas as necessary to control dust. NGP would comply with any requirements prescribed by the NDEP-BAPC. NGP also proposes to water the ground to control dust during construction.

489

Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 7  

SciTech Connect

This seventh revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology, hydrology, environmental monitoring, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors. Chapter 5.0 was not updated from the sixth revision (1994). It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE Orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

Cushing, C.E. [ed.] ed.; Baker, D.A.; Chamness, M.A. [and others] and others

1995-09-01T23:59:59.000Z

490

Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 6  

SciTech Connect

This sixth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors; Chapter 5.0 has been significantly updated from the fifth revision. It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions; The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be utilized directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

Cushing, C.E. [ed.; Baker, D.A.; Chamness, M.A. [and others

1994-08-01T23:59:59.000Z

491

Property:NEPA Resource Imposed Mitigation | Open Energy Information  

Open Energy Info (EERE)

Imposed Mitigation Imposed Mitigation Jump to: navigation, search Property Name NEPA Resource Imposed Mitigation Property Type Text Description Agency imposed mitigation plan to minimize the risk of a potential negative impact to a NEPA resource with a geothermal development effort. Pages using the property "NEPA Resource Imposed Mitigation" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Migratory_Birds + Initial ground disturbing activities would not be conducted during the migratory bird nesting season (March through July) unless necessary, and then only after inventories for migratory birds and nests were conducted by a qualified biologist acceptable to the BLM. This survey would be conducted to identify either breeding adult birds or nest sites within the specific areas to be disturbed. If active nests are present within these areas to be disturbed, NGP would coordinate with the authorized officer to develop appropriate protection measures for these sites, which may include avoidance, construction constraints, and/or the establishment of buffers.

492

Design and Drafting  

NLE Websites -- All DOE Office Websites (Extended Search)

Email Portal (Zimbra)* Email Portal (Zimbra)* * Operations Logbook* * Project Proposal System* * ICMS * Safety and Training * ANL ESQ Training * APS Phone Directory * Resources & Information* * Internal link Design and Drafting Group The Advanced Photon Source (APS) at Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The AES Design and Drafting Group supports the ASD and AES divisions' continued improvement of the accelerator as well as the scientific

493

Draft Genome Sequence  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Draft Genome Sequence of Serratia sp. Strain ATCC 39006, a Model Bacterium for Analysis of the Biosynthesis and Regulation of Prodigiosin, a Carbapenem, and Gas Vesicles Peter C. Fineran, a Marina C. Iglesias Cans, a Joshua P. Ramsay, b Nabil M. Wilf, b Desiree Cossyleon, a Matthew B. McNeil, a Neil R. Williamson, b Rita E. Monson, b S. Anette Becher, c Jo-Ann L. Stanton, d Kim Brügger, e Steven D. Brown, f George P. C. Salmond b Department of Microbiology and Immunology, University of Otago, Dunedin, New Zealand a ; Department of Biochemistry, University of Cambridge, Cambridge, United Kingdom b ; AgResearch Ltd., Invermay Agricultural Centre, Mosgiel, New Zealand c ; Department of Anatomy, University of Otago, Dunedin, New Zealand d ; EASIH, University of Cambridge, Addenbrooke's Hospital, Cambridge, United Kingdom e ; Biosciences Division, Oak Ridge National Laboratory, Oak Ridge,

494

DOE/EIS-0485 Draft Environmental Impact Statement Grande Prairie...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1000 Independence Avenue SW Washington, DC 20585 Telephone: (800) 472-2756 DOE NEPA Web Site: http:energy.gov nepaoffice-nepa-policy-and-compliance ABSTRACT: Grande...

495

Enforcement Guidance Supplements (EGS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplements (EGS) Supplements (EGS) EGS 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions (09/23/2005) EGS 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria (09/05/2003) EGS 03-01: Supplemental Guidance Concerning the Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 (07/21/2003) EGS 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation (02/21/2002) EGS 01-02: Management and Independent Assessment (12/17/2001) EGS 01-01: Nuclear Weapons Program Enforcement Issues (10/15/2001) EGS 00-04: Factual Bases for Issuing Consent Orders Pursuant to 10 CFR 820.23 and Compliance Orders Pursuant to 10 CFR Subpart C (10/26/2000) EGS 00-03: Specific Issues on Applicability of 10 CFR 830 (09/12/2000)

496

Guidance Systems Division ,  

Office of Legacy Management (LM)

Oockec No. 10-0772 Oockec No. 10-0772 22 OCT 1981 Bcndlx CorporaLion ' Guidance Systems Division , ATTN: Mr. Wf 11 la,,, Hnrr,,or Manngar, PlanL Englne0rtny Teterboro, New Jersey 07608 uwm STATES NUCLEAll I-IEOULATOIJY COMMISSION REGION i 631 PARK A"LH"I KIN0 OF PR"ISIA. PCNNIVLVANIA ID40' Gentlemen: Subject: Inspectfon 81-15 _ "-- .,; .z .;; Thts refers to the closeout safety \nspectlon conducted by Ms. M. Campbell of this office on August 27, 1961, of activities formerly authorized by NRC License No. STB-424 and to the c!lscussions of our findings held by f4s. Campbell with yourseif aL Lhe conclusion of the inspection. This closeout inspection. was conducted as part of an NRC effort to ensure that facilities where,llcensed activities were forxrrly conducted meet current NRC criteria for release for

497

DRAFT DRAFT Electricity and Natural Gas Sector Description  

E-Print Network (OSTI)

DRAFT DRAFT Electricity and Natural Gas Sector Description For Public Distribution AB 32 Scoping of electricity and natural gas; including electricity generation, combined heat and power, and electricity and natural gas end uses for residential and commercial purposes. Use of electricity and/or gas for industrial

498

DRAFT DRAFT Peer Production of Privacy and Security Information  

E-Print Network (OSTI)

DRAFT DRAFT Peer Production of Privacy and Security Information L Jean Camp* Informatics Indiana_Friedman@ksgphd.harvard.edu #12;2 L. Jean Camp and Allan Friedman, "Peer Production of Privacy and Security Information" Ethical operators in the model of the turn of the twentieth century, as it required at the turn of the nineteenth

Camp, L. Jean

499

Microsoft Word - ARRA_NEPA_Benefits_List_5.12.11  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Examples of Benefits from the NEPA Process for ARRA Funded Activities Examples of Benefits from the NEPA Process for ARRA Funded Activities May 2011 In addition to reporting results, this report explores benefits resulting from the NEPA process for ARRA funded activities. Managers who use the NEPA process to holistically consider environmental issues and requirements find that the NEPA process helps them with program and project delivery in addition to improving environmental performance. Managers are in a better position to determine how best to implement their programs and projects by considering alternatives for meeting program needs, policy objectives, and environmental requirements. They use the NEPA process to compare the relative benefits and tradeoffs associated with the alternative ways in which they can implement the projects and

500

57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). DOE is also revoking its existing NEPA guidelines. This rule incorporates changes required by certain policy initiatives instituted by the Secretary of Energy to facilitate participation of the public and affected states in the NEPA process for proposed DOE actions. The rule also includes a revised and expanded list of typical classes of actions, including categorical