Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

2

Environmental impact report (draft)  

DOE Green Energy (OSTI)

The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

Not Available

1980-05-01T23:59:59.000Z

3

EIS-0312: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

4

EIS-0283: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0283: Draft Environmental Impact Statement Surplus Plutonium Disposition Draft Environmental Impact Statement This EIS evaluates the potential...

5

EIS-0250: Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain(July 1999)

6

EIS-0323-S1: Draft Supplement Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1: Draft Supplement Environmental Impact Statement EIS-0323-S1: Draft Supplement Environmental Impact Statement Sacramento Area Voltage Support Construction and operation has...

7

EIS-0271: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

8

EIS-0431: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's...

9

EIS-0431: DOE Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of Draft Environmental Impact Statement EIS-0431: DOE Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's...

10

EIS-0350: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

11

EIS-0365: Draft Environmental Impact Statement for the Imperial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) EIS-0365: Draft Environmental Impact Statement for the...

12

EIS-0458: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0458: Draft Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis...

13

CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAMERON LIQUEFACTION PROJECT CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................... ES-1 PROPOSED ACTION ............................................................................................................... ES-1 PUBLIC INVOLVEMENT ....................................................................................................... ES-3 PROJECT IMPACTS ................................................................................................................ ES-3 ALTERNATIVES CONSIDERED ........................................................................................... ES-7 CONCLUSIONS ....................................................................................................................... ES-8

14

EIS-0447: DOE Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to...

15

EIS-0447: EPA Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to...

16

EIS-0377: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental impacts of...

17

EIS-0383: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result...

18

Salmon Creek Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

19

EIS-0450: DOE Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of Draft Environmental Impact Statement EIS-0450: DOE Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct...

20

EIS-0450: EPA Notice of Availability of Draft Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct...

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0439: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

22

EIS-0455: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA EIS-0445-DEIS-Summary-20101.pdf...

23

EIS-0290: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0290: Draft Environmental Impact Statement U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste...

24

Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

25

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

26

Draft Site-Wide Environmental Impact Statement Nevada | National...  

National Nuclear Security Administration (NNSA)

> About Us > Our Operations > NNSA Office of General Counsel > National Environmental Policy Act (NEPA) > NEPA Reading Room > Draft Site-Wide Environmental Impact Statement...

27

EIS-0284: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

28

EIS-0469: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Statement EIS-0469: Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota This EIS evaluates the...

29

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chief Joseph Hatchery Program Chief Joseph Hatchery Program Draft Environmental Impact Statement DOE/EIS-0384 May 2007 Chief Joseph Hatchery Program Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Project: Chief Joseph Hatchery Program Cooperating Tribe: Confederated Tribes of the Colville Reservation State Involved: Washington Abstract: The Draft Environmental Impact Statement (DEIS) describes a Chinook salmon hatchery production program sponsored by the Confederated Tribes of the Colville Reservation (Colville Tribes). BPA proposes to fund the construction, operation and maintenance of the program to help mitigate for anadromous fish affected by the Federal Columbia River Power System dams on the Columbia River. The Colville Tribes want to produce adequate

30

EIS-0285: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0285: Draft Environmental Impact Statement Bonneville Power Administration Transmission System Vegetation Management Program This EIS evaluates the potential environmental impacts of establishing Planning Steps for managing vegetaion for specific projets. Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). EIS-0285-DEIS-1999_0.pdf More Documents & Publications Report to Congress: Corridors and Rights-of-Way on Federal Lands EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement Funding for state, city, and county governments in the state includes:

31

EIS-0349: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. Approximately 195 acres of undeveloped land would be converted for the cogeneration facility; gas, water, wastewater, and steam pipelines; construction laydown areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic benefits of the proposed action, and identifies mitigation measures to compensate for the unavoidable impacts. Alternative

32

EIS-0450: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the environmental review, also announce the availability of the Draft EIS. EIS-0450-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of Final Environmental Impact

33

EIS-0431: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA EPA announces the availability of the Draft Environmental Impact Statement for the Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. EIS-0431-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0460: EPA Notice of Availability of Final Environmental Impact

34

EIS-0445: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0445: Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia This EIS evaluates the...

35

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

36

Draft Environmental Impact Statement Available for Public Review |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step forward in cleaning up the site. The document, entitled "Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D (Revised)), is a revision of the 1996 Cleanup and Closure

37

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

38

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

39

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

40

EIS-0442: EPA Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

2: EPA Notice of Availability of Draft Environmental Impact 2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska. EIS-0442-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0389: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0442: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah This Draft EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. It evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx EIS-0442: Draft Environmental Impact Statement More Documents & Publications

42

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

43

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

44

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

45

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

46

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

47

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

48

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

49

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

50

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

51

EIS-0396: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Programmatic Environmental Impact Statement 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained production of nuclear-generated electricity, while reducing the impacts associated with spent nuclear fuel disposal and reducing proliferation risks. The Department of Energy (DOE) proposed action envisions changing the United States nuclear energy fuel cycle from an open (or once-through) fuel

52

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 4:31pm Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

53

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to

54

Agencies Publish Draft Environmental Impact Statement on Energy Transport  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement on Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 11:31am Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in

55

EIS-0340: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project To assist in the conservation and recovery of Chinook salmon native to the Grande Ronde River and Imnaha River subbasins, the Proposed Action of updating and modifying two existing hatcheries and constructing three new hatchery facilities at other sites is being studied in this Draft Environmental Impact Statement (Draft EIS). BPA proposes to fund the capital improvements and the operation and maintenance of all five facilities to aid BPA's efforts to mitigate and recover anadromous fish affected by the Federal Columbia River Power System. The Lower Snake River run of spring/summer chinook was listed as threatened under the Endangered

56

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S1: Draft Supplemental Programmatic Environmental Impact S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement EIS-0236: Record of Decision DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

57

EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36-S1: Draft Supplemental Programmatic Environmental Impact 36-S1: Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the potential environmental impacts of continuing to construct and operate the National Ignition Facility at LLNL with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials." EIS-0236-S1-DEIS-1999.pdf EIS-0236-S1-DEIS-Figures-1999.pdf More Documents & Publications EIS-0236-S1: Supplemental Environmental Impact Statement DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II:

58

EIS-0382: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 606 megawatts of electricity (MWe) for export to the electrical grid, 1,212 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

59

EIS-0464: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture and Sequestration (ICCS) Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60

60

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0444: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

62

EIS-0400: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the environmental impacts of a proposal to rebuild and upgrade the Western Area Power Administration's 12-mile Granby Pumping Plant-Windy Gap 69-kV transmission line in Grand County, Colorado. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and decided to prepare an EIS instead of completing the EA. Further information about the project is available on the project website. EIS-0400-DEIS-2012.pdf More Documents & Publications EIS-0400: Final Environmental Impact Statement EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement

63

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of Draft Environmental Impact DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

64

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0447: DOE Notice of Availability of Draft Environmental Impact EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

65

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

66

EIS-0288: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0288: Draft Environmental Impact Statement This Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (CLWR EIS) evaluates the environmental impacts associated with producing tritium at one or more of the following five CLWRs: (1) Watts Bar Nuclear Plant Unit 1 (Spring City, Tennessee); (2) Sequoyah Nuclear Plant Unit 1 (Soddy Daisy, Tennessee); (3) Sequoyah Nuclear Plant Unit 2 (Soddy Daisy, Tennessee); (4) Bellefonte Nuclear Plant Unit 1 (Hollywood, Alabama); and (5) Bellefonte Nuclear Plant Unit 2 (Hollywood, Alabama). Specifically, this EIS analyzes the potential environmental impacts associated with fabricating tritium-producing burnable absorber rods (TPBARs); transporting nonirradiated TPBARs from the

67

EIS-0336: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the proposed action and reasonable alternatives, including the "No Action" alternative. In addition, because the U.S. Forest Service, the Bureau of Land Management, and the U.S. International Boundary Water Commission (USIBWC) must act, and because their actions are

68

EIS-0435: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0435: Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to modify its interconnection agreement with Basin Electric for the Groton Generation Station to eliminate Western's 50-megawatts (MW) annual average operating limit. The Groton Generation Station is located about 5 miles south of Groton, South Dakota. Basin Electric needs to eliminate the operating limit to help serve increased load demand for electric power in the eastern portion of its service area Western Area Power Administration Draft Environmental Impact Statement

69

EIS-0423: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE proposes to construct one or more new facilities and/or select one or more existing facilities (including modification as needed) for the long-term management and storage of mercury, as mandated by Section 5 of the Act. Any such facility must comply with applicable requirements of Section 5 of the Act, "Management Standards for a Facility," including the requirements of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901 et seq.) and other permitting requirements. Draft Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement, DOE/EIS-0423D (January 2010)

70

EIS-0409: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and hot exhaust gas from the gas turbines would generate steam from water to drive a steam turbine. EIS-0409-DEIS-Summary-2009.pdf Draft Environmental Impact Statement, Kemper...

71

EIS-0385: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0385: Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve As required by the Energy Policy Act of 2005 (P.L. 109-58), DOE would expand the SPR to its full authorized 1 billion-barrel capacity by selecting additional storage sites. DOE would develop one new site or a combination of two new sites, and would expand capacity at two or three existing sites. Storage capacity would be developed by solution mining of salt domes and disposing of the resulting salt brine by ocean discharge or underground injection. New pipelines, marine terminal facilities, and other infrastructure could also be required. DOE has prepared this draft EIS to address the environmental impacts of the proposed expansion of the capacity

72

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

73

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

74

EIS-0488: FERC Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

88: FERC Draft Environmental Impact Statement 88: FERC Draft Environmental Impact Statement EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

75

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Impact Statement 8: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

76

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

77

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

78

Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.  

SciTech Connect

This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

79

EIS-0287: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0287: Draft Environmental Impact Statement Idaho High-Level Waste & Facilities Disposition This EIS evaluates the potential environmental impacts of managing two waste types at the Idaho National Engineering and Environmental Laboratory, namely, high-level waste in a calcine form and liquid mixed transuranic waste (historically know as sodium bearing waste and newly generated liquid waste). It also analyzes the disposition of existing and proposed high-level waste facilities after their missions have been completed. EIS-0287-DEIS-1999.pdf EIS-0287-DEIS-Figures-1999.pdf More Documents & Publications EIS-0287: Final Environmental Impact Statement EIS-0287: Idaho High-Level Waste and Facilities Disposition Final

80

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EIS-0319: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

319: Draft Environmental Impact Statement 319: Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated relocateing the TA-18 security Category I/II capabilities and materials to new locations: 1) different site at LANL (the preferred alternative) at Los Alamos, New Mexico; 2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; 3) the Nevada Test Site near Las Vegas; and 4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS analyzes upgrading of the TA-18 facilities at LANL. EIS-0319-DEIS-2001.pdf More Documents & Publications EIS-0319: Final Environmental Impact Statement EIS-0319: Record of Decision EIS-0236-S4: Final Supplemental Programmatic

82

Condon Wind Project Draft Environmental Impact Statement  

DOE Green Energy (OSTI)

BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource acquisition strategy; and meeting the objectives of its Power Business Line's Strategic Plan. The Draft Environmental Impact Statement (DEIS) evaluates the environmental impacts of the Proposed Action (to execute one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the proposed Condon Wind Project) and the No Action Alternative. BPA's preferred alternative is the Proposed Action. BPA has also identified the Proposed Action as the environmentally-preferred alternative. The proposed wind project is located on private agricultural land in Gilliam County, Oregon. The 38-acre project site is located within a 4,200-acre study area located on both sides of Oregon Highway 206, approximately 5 miles northwest of the town of Condon. The project would use modern, efficient 600-kilowatt (kW) wind turbines to convert energy in the winds to electricity that would be transmitted over the existing BPA transmission system. The project would consist of one or two phases: the first phase would use 41 wind turbines to yield a capacity of approximately 24.6 megawatts (MW). A second phase (if built) would use 42 wind turbines to yield a capacity of approximately 25.2 MW. For purposes of this DEIS, the size of the project is assumed to be 49.8 MW, built in two phases. Major components of the wind project include wind turbines and foundations, small pad-mounted transformers, an operation and maintenance building, power collection and communication cables, project access roads, meteorological towers on foundations, and a substation. During construction there would also be temporary equipment storage and construction staging areas. The first phase is proposed for construction in late 2001; the second phase could be constructed during spring/summer 2002 or later.

N /A

2001-06-01T23:59:59.000Z

83

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Draft Environmental Impact Statement 03: Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

84

EIS-0303: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0303: Draft Environmental Impact Statement High-Level Waste Tank Closure, Savannah River Operations Office, Aiken, SC This EIS evalutes the potential environmental impacts of a proposal to close the high-level waste tanks at the Savannah River Site in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste incidental to reprocessing. The proposed action would begin after bulk waste removal has been completed. This EIS evaluates three alternatives regarding the HLW tanks at the SRS. The three alternatives are the Clean and Stabilize Tanks

85

EIS-0488: Notice of Availability Draft Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: Notice of Availability Draft Environmental Impact 488: Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. EIS-0488-DEIS-NOA-2014.pdf More Documents & Publications

86

EIS-0488: EPA Notice of Availability of Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: EPA Notice of Availability of Draft Environmental Impact 488: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is

87

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

88

EIS-0250-S2: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2D) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

89

EIS-0399: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a merchant 230-kV transmission line between Great Falls, Montana, and Lethbridge, Alberta, that would cross the U.S.-Canada border north of Cut Bank, Montana. The transmission line would transmit 300 megawatts (MW) of electric power south and 300 MW north. EIS-0399-DEIS-Summary-2008.pdf EIS-0399-DEIS-01a-2008.pdf EIS-0399-DEIS-01b-2008.pdf EIS-0399-DEIS-01c-2008.pdf EIS-0399-DEIS-01d-2008.pdf EIS-0399-DEIS-01e-2008.pdf EIS-0399-DEIS-02-2008.pdf More Documents & Publications EIS-0399: Final Environmental Impact Statement EIS-0399-SA-01: Supplement Analysis Management Alert: OAS-RA-12-01

90

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

91

EIS-0305: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Impact Statement 5: Draft Environmental Impact Statement EIS-0305: Draft Environmental Impact Statement Treating Transuranic/Alpha Low-Level Waste at the Oak Ridge National Laboratory This EIS evaluates the potential environmental impacts of a proposal to construct, operate, and decontaminate/decommission a TRU Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-levelwaste solids. The mixed sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste.

92

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

93

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

94

EIS-0374: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike III/Biglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. EIS-0374-DEIS-Summary-2006.pdf EIS-0374-DEIS-2006.pdf EIS-0374-DEIS-commentextension-2005.pdf More Documents & Publications EIS-0374: Final Environmental Impact Statement EIS-0374: Notice of Extension of Comment Period EIS-0374: Record of Decision

95

EIS-0450: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0: Draft Environmental Impact Statement 0: Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. EIS-0450-DEIS-Volume1-2013.pdf EIS-0450-DEIS-Volume2-2013.pdf EIS-0450-DEIS-Volume3-2013.pdf EIS-0450-DEIS-Appendices_A-H-2013.pdf More Documents & Publications

96

EIS-0460: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. EIS-0460-DEIS-Summary-2013.pdf EIS-0460-DEIS-Volume_I-2013.pdf EIS-0460-DEIS-Volume_II-2013.pdf More Documents & Publications

97

EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. This CMRR-NF SEIS examines the potential environmental impacts associated with NNSA's proposed

98

Draft Nevada National Security Site Environmental Impact Statement Released  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Environmental Impact Statement Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada is available for public review and comment through October 27, 2011. Within the draft SWEIS, the U.S. Department of Energy, National Security Administration Nevada Site Office presents a formal analysis of how current and potential missions at the NNSS (formerly the Nevada Test Site) and related off-site locations may affect the environment over the next ten

99

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

100

EIS-0473: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial assistance to NRG under the Clean Coal Power Initiative (CCPI) Program to support construction and operation of NRG's Parish PCCS Project . EIS-0473-DEIS-Summary-2012.pdf EIS-0473-DEIS-VolumeI-2012.pdf EIS-0473-DEIS-VolumeII-AppendicesA-B-2012.pdf EIS-0473-DEIS-VolumeII-AppendixC-Part1-2012.pdf

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement

102

EIS-0407: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0407: Draft Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide approximately $85 million of the total anticipated cost of approximately $300 million (2008 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity) sufficient to meet the needs of

103

EIS-0286: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide capabilities to continue, or modify, the way it treats, stores, and/or disposes of existing and anticipated quantities of solid LLW, MLLW, TRU waste, and ILAW at the Hanford Site in order to protect human health and the environment; facilitate cleanup at Hanford and other DOE facilities; take actions consistent with decisions reached by DOE under the WM PEIS; comply with local, State, and federal laws and regulations; and meet other obligations such as the Hanford Federal Facility Agreement and Consent Order (also referred to as the Tri-Party Agreement, or TPA) (Ecology et al. 1989).

104

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

105

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

106

EIS-0395: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio Colorado (SLRC) Power Center, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company's (APS') North Gila Substation. The Proposed Project would require an expansion of Gila Substation and additional equipment at North Gila Substation; all of the proposed transmission components would be located in Yuma County, Arizona. Depending on the route ultimately selected, the total length of the 500-kV transmission system within the United States would be approximately 25.7 miles-21 miles from the United States-Mexico border to Gila Substation

107

EIS-0310: Draft Programmatic Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Draft Programmatic Environmental Impact Statement 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these responsibilities, DOE maintains nuclear infrastructure capabilities that support various missions. Current estimates for the future needs of medical and industrial isotopes, plutonium-238, and research requirements indicate that the current infrastructure may soon be insufficient to meet the projected demands. DOE proposes to enhance these

108

EIS-0360: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed DUF6 conversion facility at three

109

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

110

EIS-0440: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0440: Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment (November 2011) Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and

111

EIS-0378: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to Bonneville Power Administration (BPA), another organizational unit within DOE, for interconnection into the federal transmission system. EIS-0378-DEIS-Summary-2007.pdf

112

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

113

EIS-0418: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project, Deer Creek Station Energy Facility Project, Brookings County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to provide interconnection services, and Rural Utilities Service (RUS) proposes to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility. The facility is being proposed to meet projected intermediate demands for electricity in the eastern portion of Basin Electric Power Cooperative's service territory, as determined from a power supply analysis. Basin Electric's alternatives analysis included alternative power generation

114

EIS-0391: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0391: Draft Environmental Impact Statement Tank Closure and Waste Management for the Hanford Site, Richland, WA Abstract: The Hanford Site (Hanford), located in southeastern Washington State and situated along the Columbia River, is approximately 1,518 square kilometers (586 square miles) in size. Hanford's mission from the early 1940s to approximately 1989 included defense-related nuclear research, development, and weapons production activities. These activities created a wide variety of chemical and radioactive wastes. Hanford's mission now is focused on the cleanup of those wastes and ultimate closure of Hanford. To this end, several types of radioactive waste are being managed at Hanford: (1) high-level radioactive waste (HLW) as defined in DOE Manual

115

EIS-0397: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to habitat in the upper part of the watershed. Funding from BPA would serve to provide off-site mitigation for the effects of the federal Columbia River hydroelectric facilities on fish populations by improving fish passage at Lyle Falls. While the fish passage issues at Lyle Falls were not caused by the hydroelectric facilities, this project would help BPA meet its mitigation responsibilities and potentially increase overall fish production in the Columbia Basin by enhancing fish passage into the Klickitat subbasin. EIS-0397-DEIS-Summary-2008.pdf EIS-0397-DEIS-2008.pdf More Documents & Publications

116

Resource Contingency Program : Draft Environmental Impact Statement.  

SciTech Connect

In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

United States. Bonneville Power Administration.

1995-02-01T23:59:59.000Z

117

MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MESABA ENERGY PROJECT MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 DOE/EIS-0382D MN PUC DOCKET # E6472/GS-06-668 U.S. Department of Energy in cooperation with Minnesota Department of Commerce Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Responsible State Agency: Minnesota Department of Commerce (MDOC) Cooperating Agencies: U.S. Army Corps of Engineers and U.S. Department of Agriculture Forest Service Title: Mesaba Energy Project, Draft Environmental Impact Statement (DOE/EIS-0382D) Location: Taconite Tax Relief Area of northeastern Minnesota, Itasca and St. Louis Counties Contact: For further information about this Environmental Impact Statement, contact:

118

Maiden Wind Farm Draft Environmental Impact Statement  

SciTech Connect

In February 2001, Washington Winds Inc. (the project developer) submitted a proposal to Bonneville Power Administration (BPA) for a site north of the cities of Sunnyside and Prosser in Washington where wind power facilities could be developed. After considering preliminary information, BPA decided to examine the proposed project and consider purchasing and transmitting power from the project. The project developer also submitted Conditional use Permit (CUP) applications to Benton and Yakima Counties. Benton County, serving as the lead agency for the State Environmental Policy Act (SEPA), issued a Determination of Significance on June 11, 2001. The action proposed by BPA is to: (1) execute a 20-year power purchase agreement with the project developer for up to 50 average megawatts (aMW) (up to about 200 megawatts [MW]) of electrical energy from the proposed Maiden Wind Farm; and (2) execute construction and generation interconnection agreements with the project developer to integrate the power generated by the proposed Maiden Wind Farm into BPA's transmission system. The need for the proposed action arises primarily from BPA's statutory obligations and planning directives. BPA will consider the information in this Environmental Impact Statement (EIS), public comments, and other factors when deciding whether to purchase power from the proposed wind project and transmit it over BPA transmission lines. Benton and Yakima County Planning Departments will consider information in this EIS when deciding whether to grant a CUP and allow the proposed project to be developed.

N /A

2002-03-29T23:59:59.000Z

119

Lyle Falls Fish Passage Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Draft Environmental Impact Statement DOE/EIS-0397 March 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Lyle Falls Fish Passage Project Draft Environmental Impact Statement (DOE/EIS-0397) Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); Confederated Tribes and Bands of the Yakama Nation (Yakama Nation); Washington Department of Fish and Wildlife (WDFW); U.S. Department of Agriculture, Forest Service (USFS), Title of Proposed Project: Lyle Falls Fish Passage Project State Involved: Washington (WA) Abstract: BPA proposes to fund modification of the existing Lyle Falls Fishway on the lower Klickitat River in

120

EIS-0353: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana EIS No. 040274, Draft EIS, DOE, MT, South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Preserve the Genetic Purity of the Westslope Cutthroat Trout Population, Flathead National Forest, Flathead River, Flathead, Powell and Missoula Counties, Montana DOE/EIS-0353 Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana, 69 FR 34161 (June 2004) More Documents & Publications

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EIS-0359: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0359: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site DOE/EIS-0359, Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site, 68 FR 66825 (November 2003) More Documents & Publications EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact

122

Draft Environmental Impact Statement for a Container System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Navy (Lead Agency) the Navy (Lead Agency) Naval Nuclear Propulsion Program Department of Energy (Cooperating Agency) - DOE/EIS-0251 Prepared in accordance with: National Environmental Policy Act Section 102 (2) (C) FINAL ENVIRONMENTAL IMPACT STATEMENT FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF NAVAL SPENT NUCLEAR FUEL Contact: William Knoll Department of the Navy Code NAVSEA 08U 2531 Jefferson Davis Highway Arlington, VA 22242-5160 Telephone Number: 703-602-8229 Abstract: This Final Environmental Impact Statement (EIS) addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. It supersedes the Draft Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel dated May 1996.

123

Chief Joseph Hatchery Program, Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joseph Hatchery Program Joseph Hatchery Program Draft EIS S-1 SUMMARY Purpose and Need The Northwest Power and Conservation Council (NPCC, www.nwcouncil.org) recommended that the Bonneville Power Administration (BPA) study and consider funding a Chinook salmon production program and hatchery proposed by the Confederated Tribes of the Colville Reservation (Colville Tribes). The proposal intends to increase returns of adult summer/fall Chinook by raising and releasing juvenile fish in the waters of the Okanogan River, and in the Columbia River below Chief Joseph Dam and above its confluence with the Okanogan River. The proposed program would construct, operate and maintain a hatchery below the Chief Joseph Dam on the Columbia River and several fish acclimation and release ponds on the Okanogan River and Omak

124

EIS-0444: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

444: EPA Notice of Availability of the Draft Environmental 444: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0444: EPA Notice of Availability of the Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of Availability - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals Production Plant, Odessa, Ector County, Texas, DOE/EIS-0444 (March 2011 - 76 FR 14968) More Documents & Publications EIS-0403: EPA Amended Notice of Availability of the Draft Programmatic Environmental Impact Statement (Extension of Public Comment Period) EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact

125

EIS-0373: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: EPA Notice of Availability of the Draft Environmental 73: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0373: EPA Notice of Availability of the Draft Environmental Impact Statement Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems DOE/EIS-0373, EPA Notice of Availability of the Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems, 70 FR 38132 (July 2005) More Documents & Publications EIS-0374: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact

126

Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering & Services; COGEMA, Inc.; and Stone & Webster (known as DCS) to provide the requested services. The procurement process included the environmental review specified in DOE's NEPA regulations in 10 CFR 1021.216. The six reactors selected are Catawba Nuclear Station Units 1 and 2 in South Carolina McGuire Nuclear Station Units 1 and 2 in North Carolina, and North Anna Power Station Units 1 and 2 in Virginia. The Supplement describes the potential environmental impacts of using MOX fuel in these six specific reactors named in the DCS proposal as well as other program changes made since the SPD Draft EIS was published.

N /A

1999-05-14T23:59:59.000Z

127

EIS-0284: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois DOE/EIS-0284, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois, 69 FR 10442 (March 2004) More Documents & Publications EIS-0348: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0397: EPA Notice of Availability of the Draft Environmental Impact

128

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

129

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

130

Draft Environmental Impact Statement Ivanpah Energy Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 6: Summary of Impacts Section 6: Summary of Impacts SECTION 6 SUMMARY OF IMPACTS The alternatives analysis resulted in retention of the Proposed Goodsprings Plant Site (Alternative E), the Primm Plant Site (Alternative F), and the No Action Alternative for further consideration. The Proposed Goodsprings Plant Site would be located on a 30-acre parcel; an additional 10 acres would be used as a temporary laydown area. Natural gas supply to the plant would be from the KRGT pipeline which is adjacent to the plant site. Development of the site also would require improvements to the permanent northern access road and temporary southern access road and installation of a telecommunications line. The plant site, temporary laydown area, access roads, and telecommunications line

131

EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management The Department of Energy (DOE) announces the availability of the Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility(NIF) Project Specific Analysis portion (Volume III, Appendix I) of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS) DOE/EIS-0236-S1 for public review and comment. EIS-0236-S1-NOA_DEIS-1999.pdf More Documents & Publications EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

132

EIS-0375: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOE/EIS-0375, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste, Proposed Development, Operation, and Long-Term Management of a Disposal Facility, 76 FR 10584 (February 2011) More Documents & Publications EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0434: Notice of Cancellation of an Environmental Impact Statement EIS-0439: EPA Notice of Availability of the Draft Environmental Impact

133

Draft Environmental Impact Statement Ivanpah Energy Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Summary Executive Summary EXECUTIVE SUMMARY IVANPAH ENERGY CENTER Ivanpah Energy Center, L.P., a Diamond Generating Corporation Company, a subsidiary of Mitsubishi Corporation proposes to construct and operate a 500 Megawatt (MW) gas-fired electric power generating station in southern Clark County, Nevada. The facility that would be known as the Ivanpah Energy Center, LP, would be located approximately 25 miles south of Las Vegas. Six potential plant sites within the Ivanpah Valley were initially identified as potentially suitable for development; four sites were eliminated from further consideration due to environmental and engineering constraints. A site that is approximately 2.5 miles southeast of Goodsprings and a site that would be co- located with the Reliant Bighorn

134

Sacramento Area Voltage Support Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

N /A

2002-11-15T23:59:59.000Z

135

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

136

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: EPA Notice of Availability of the Draft Environmental 1: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft

137

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Final Environmental Impact

138

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21: EPA Notice of Availability of the Draft Environmental 21: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

139

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft Environmental Impact

140

EIS-0281: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement EIS-0281: Draft Environmental Impact Statement DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative (exclusive of the Microsystems and Engineering Sciences Applications Complex configuration). EIS-0281-DEIS-1999-Summary-Chapts1-4_1.pdf EIS-0281-DEIS-1999-Appendices_2.pdf EIS-0281-DEIS-1999-MainVolume_10.pdf More Documents & Publications TEE-0074 - In the Matter of GE Appliances & Lighting CX-003794: Categorical Exclusion Determination EIS-0281: Final Site-Wide Environmental Impact Statement

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0348: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: EPA Notice of Availability of the Draft Environmental 8: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0348: EPA Notice of Availability of the Draft Environmental Impact Statement Site-wide Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship and Management, Implementation Alameda and San Joaquin Counties, CA U.S. Environmental Protection Agency Environmental Impact Statements Notices of Availability: Site-wide Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Stockpile Stewardship and Management,Implementation, Alameda and San Joaquin Counties, CA, EIS-0348, EIS-0236S3 (February 2004) More Documents & Publications EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0397: EPA Notice of Availability of the Draft Environmental Impact

142

EIS-0496: Notice of Intent to Prepare a Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

6: Notice of Intent to Prepare a Draft Environmental Impact 6: Notice of Intent to Prepare a Draft Environmental Impact Statement EIS-0496: Notice of Intent to Prepare a Draft Environmental Impact Statement DOE's Western Area Power Administration announces its intent to prepare, with the Bureau of Reclamation as a cooperating agency, a joint EIS and environmental impact report to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. For the purposes of the environmental impact report under the California Environmental Quality Act (CEQA), the San Luis & Delta-Mendota Water Authority is the lead agency. EIS-0496: Notice of Intent More Documents & Publications EIS-0323: Draft Environmental Impact Statement

143

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07: EPA Notice of Availability of the Draft Environmental 07: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement

144

EIS-0413: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the Searchlight Wind Energy Project. The EIS evaluates the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. EIS-0413-EPANOA-2012.pdf More Documents & Publications EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Final Environmental Impact Statement

145

EIS-0478: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: EPA Notice of Availability of a Draft Environmental 8: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0478: EPA Notice of Availability of a Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project EPA announces the availability of the Draft EIS for the Antelope Valley Station to Neset Transmission Project, prepared by the Rural Utility Service. This EIS evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration is a cooperating agency. EIS-0478-EPADEISNOA-2012.pdf More Documents & Publications EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0414: EPA Notice of Availability of the Draft Environmental Impact

146

EIS-0336: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement'' (DOE/EIS-0336) for public review and comment. DOE/EIS-0336, Department of Energy, Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line, 68 FR 51569 (August 2003) More Documents & Publications EIS-0336: Final Environmental Impact Statement

147

EIS-0413: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0413: EPA Notice of Availability of a Draft Environmental EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the Searchlight Wind Energy Project. The EIS evaluates the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. EIS-0413-EPANOA-2012.pdf More Documents & Publications EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Final Environmental Impact

148

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: EPA Notice of Availability of the Draft Environmental 6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

149

EIS-0281: Draft Environmental Impact Statement Summary (Spanish) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Summary (Spanish) Statement Summary (Spanish) EIS-0281: Draft Environmental Impact Statement Summary (Spanish) DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative (exclusive of the Microsystems and Engineering Sciences Applications Complex configuration). EIS-0281-DEIS-Spanish_Summary-1999.pdf More Documents & Publications Ahorre Energía 2013 National Environmental Justice Conference and Training Program PREPARATIVOS EN MARCHA PARA LA CONFERENCIA SOBRE JUSTICIA AMBIENTAL NACIONAL Y EL PROGRAMA DE CAPACITACIÓN 2014

150

Draft Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement (PEIS) for Solar Energy Development in Six Southwestern States (DES 10-59; DOE/EIS-0403) Responsible Agencies: The U.S. Department of the Interior (DOI) Bureau of Land Management (BLM) and the U.S. Department of Energy (DOE) are co-lead agencies. Nineteen cooperating agencies participated in the preparation of this PEIS: U.S. Department of Defense; U.S. Bureau of Reclamation; U.S. Fish and Wildlife Service; U.S. National Park Service; U.S. Environmental Protection Agency, Region 9; U.S. Army Corps of Engineers, South Pacific Division; Arizona Game and Fish Department; California Energy Commission; California Public Utilities Commission; Nevada Department of Wildlife; N-4 Grazing Board, Nevada; Utah Public Lands Policy Coordination Office; Clark County, Nevada,

151

EIS-0387: Draft Site-Wide Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Site-Wide Environmental Impact Statement Draft Site-Wide Environmental Impact Statement EIS-0387: Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The NNSA, a separately organized agency within the DOE, has the responsibility to maintain the safety, reliability, and security of the U.S. nuclear weapons stockpile to meet national security requirements. NNSA manages nuclear weapons programs and facilities, including those at the Y-12 National Security Complex (Y-12) at Oak Ridge, Tennessee. This Draft Y-12 SWEIS analyzes the potential environmental impacts of reasonable alternatives for ongoing and foreseeable future operations, facilities, and activities at Y-12. EIS-0387-DEIS-Summary-2009.pdf Draft Site-Wide Environmental Impact Statement for the Y-12 National

152

EIS-0460: DOE Notice of Availability of the Draft Environmental Impact  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0460: DOE Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois DOE announces the availability of the Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) for public review and comment, as well as the date, location, and time for a public hearing. The draft environmental impact statement (EIS) analyzes the potential impacts associated with the FutureGen 2.0 Project (FutureGen 2.0), which would be designed, constructed, operated, and partially funded by the FutureGen Industrial Alliance, Inc. (Alliance). In addition to Alliance funding, FutureGen 2.0 may receive approximately $1 billion in federal

153

EIS-0385: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85: EPA Notice of Availability of the Draft Environmental 85: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements: Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX DOE/EIS-0385, Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve

154

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

399: EPA Notice of Availability of the Draft Environmental 399: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

155

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: EPA Notice of Availability of the Draft Environmental 79: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0464: EPA Notice of Availability of Final Environmental Impact

156

EIS-0357: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: DOE Notice of Availability of the Draft Environmental 7: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0357: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability of the document, Draft Environmental Impact Statement for the Gilberton Coal to-Clean Fuels and Power Project (DOE/EIS-0357), for public comment. The draft environmental impact statement (EIS) analyzes the potential environmental consequences of providing federal funding for the design, engineering, construction, and operation of the first power facility in the United States to use coal waste as feed to a gasification facility that subsequently generates fuel gas for clean power, thermal energy, and clean

157

EIS-0385: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements: Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX DOE/EIS-0385, Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve

158

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

159

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

160

EIS-0382: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN The draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of $36 million in cofunding, through a financial assistance cooperative agreement, for the design and one-year operational demonstration of a coal-based, Integrated Gasification Combined Cycle (IGCC) electric generating facility on the Iron Range of northern Minnesota. Notice of Availability of the Draft Environmental Impact Statement for the Mesaba Energy Project (DOE/EIS-0382D)(November 8, 2007)(72FR63169) More Documents & Publications

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0439: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: DOE Notice of Availability of the Draft Environmental 9: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and the Loan Guarantee Program (LGP), the California Energy Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact Statement (EIS) and Staff Assessment (SA), which may require a California Desert Conservation Area (CDCA) Plan Amendment, as a joint environmental analysis document for the proposed Rice Solar Energy Project (Project), in Riverside County, California, and by this notice are announcing the opening of the comment period. Western Area Power Administration Draft Environmental Impact

162

Draft Environmental Impact Statement for the Disposal of Greater...  

NLE Websites -- All DOE Office Websites (Extended Search)

for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste WASHINGTON The Department of Energy (DOE) has issued a Draft Environmental...

163

EIS-0365: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV Transmission Line, Presidential Permit and Right-of- Way Grants, Imperial Valley Substation to Calexico at the U.S.- Mexico Border, Imperial County, CA Notice of Availability Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines (69FR26817) (May 14, 2004) More Documents & Publications EIS-0365: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Final Environmental Impact

164

EIS-0350: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico U.S. Department of Energy (DOE), announces the availability of the Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico (the Draft CMRR EIS), and the dates and locations for the public hearings to receive comments on the Draft CMRR EIS. The present Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL) houses mission critical analytical chemistry, material

165

EIS-0414: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: DOE Notice of Availability of the Draft Environmental 4: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Energia Sierra Juarez U.S. Transmission Project (ESJ-U.S.), EIS-0414 (September 2010) More Documents & Publications Addressing Policy and Logistical Challenges to Smart Grid Implementation:

166

EIS-0435: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0435: EPA Notice of Availability of the Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Availability for the Draft Environmental Impact Statement for the Groton Generation Station (GGS) Project, Proposes to Modify its Interconnection Agreement, Basin Electric Power Cooperative, for the (GGS) to Eliminate 50-Megawatts (MW) Annual Average Operating Limit, Brown County, South Dakota. Notice of Availability for the Draft Environmental Impact Statement for the Groton Generation Station (GGS) Project, Brown County, South Dakota, DOE/EIS-0435 (August 2010 - 75 FR 47591) More Documents & Publications

167

EIS-0355: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

168

EIS-0365: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: EPA Notice of Availability of the Draft Environmental 5: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV Transmission Line, Presidential Permit and Right-of- Way Grants, Imperial Valley Substation to Calexico at the U.S.- Mexico Border, Imperial County, CA Notice of Availability Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines (69FR26817) (May 14, 2004) More Documents & Publications EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Final

169

EIS-0340: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0340: EPA Notice of Availability of the Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project DOE/EIS-0340, Northeast Oregon Hatchery Program, Grande Ronde-Imnaha Spring Chinook Hatchery Project, To Modify and Modernize two Existing Hatchery Facilities and Construct three Auxiliary Hatchery Facilities, Wallowa County, Oregon, 68 FR 28213 (May 2003) More Documents & Publications EIS-0236-S2: EPA Notice of Availability of the Draft Supplement to the Programmatic Environmental Impact Statement EIS-0318: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact

170

BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement  

SciTech Connect

BP West Coast Products, LLC (BP or the Applicant) proposes to construct and operate a nominal 720-megawatt (MW), natural-gas-fired, combined-cycle cogeneration facility next to the existing BP Cherry Point Refinery in Whatcom County, Washington. The Applicant also owns and operates the refinery, but the cogeneration facility and the refinery would be operated as separate business units. The cogeneration facility and its ancillary infrastructure would provide steam and 85 MW of electricity to meet the operating needs of the refinery and 635 MW of electrical power for local and regional consumption. The proposed cogeneration facility would be located between Ferndale and Blaine in northwestern Whatcom County, Washington. The Canadian border is approximately 8 miles north of the proposed project site. The Washington State Energy Facility Site Evaluation Council (EFSEC) has jurisdiction over the evaluation of major energy facilities including the proposed project. As such, EFSEC will recommend approval or denial of the proposed cogeneration facility to the governor of Washington after an environmental review. On June 3, 2002, the Applicant filed an Application for Site Certification (ASC No. 2002-01) with EFSEC in accordance with Washington Administrative Code (WAC) 463-42. On April 22, 2003, the Applicant submitted an amended ASC that included, among other things, a change from air to water cooling. With the submission of the ASC and in accordance with the State Environmental Policy Act (SEPA) (WAC 463-47), EFSEC is evaluating the siting of the proposed project and conducting an environmental review with this Environmental Impact Statement (EIS). Because the proposed project requires federal agency approvals and permits, this EIS is intended to meet the requirements under both SEPA and the National Environmental Policy Act (NEPA). The Bonneville Power Administration (Bonneville) and U.S. Army Corps of Engineers (Corps) also will use this EIS as part of their respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

N /A

2003-09-19T23:59:59.000Z

171

EIS-0457: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Comment Period Ends: 03/05/12 Submit Comments to: Douglas Corkran Environmental Specialist Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-7646 Fax: 503-230-5699 Electronic mail: dfcorkran@bpa.gov EIS-0457-EPANOADEIS-2012.pdf More Documents & Publications EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

172

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

173

EIS-0423-S1: Draft Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

174

Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.  

Science Conference Proceedings (OSTI)

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

175

Puget Sound area electric reliability plan. Draft environmental impact statement  

SciTech Connect

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

Not Available

1991-09-01T23:59:59.000Z

176

Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement Summary.  

DOE Green Energy (OSTI)

This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe`s culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle.

United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho)

1996-06-01T23:59:59.000Z

177

DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013.

178

EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Notice of Intent to Prepare a Draft Environmental Impact 0: Notice of Intent to Prepare a Draft Environmental Impact Statement EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam, AZ Two agencies of the Department of Interior, the Bureau of Reclamation and the National Park Service announces their intent to prepare an EIS for a Long-Term Experimental and Management Plan for the operation of the Glen Canyon Dam. DOE's Western Area Power Administration is a cooperating agency. EIS-0480-NOI-2011.pdf More Documents & Publications EIS-0150: Final Environmental Impact Statement 2013 Annual Planning Summary for the Western Area Power Administration Environmental Impact Statements and Environmental Assessments Status Chart

179

"FutureGen 2.0 Project Draft Environmental Impact Statement Summary"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SHEET SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

180

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0343: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement COB Energy Facility, Proposes to Construct a 1,160-megawatt (MW) Natural Gas-Fired and Combined- Cycle Electric Generating Plant, Right- of-Way Permit across Federal Land under the Jurisdiction of BLM, Klamath Basin, Klamath County, OR DOE/EIS-0343, EPA Notice of Availability, COB Energy Facility, Proposes to Construct a 1,160-megawatt (MW) Natural Gas-Fired and Combined-Cycle Electric Generating Plant, Right-of-Way Permit cross Federal Land under the Jurisdiction of BLM, Klamath Basin, Klamath County, Oregon, 68 FR 66825 (November 2003) More Documents & Publications EIS-0359: EPA Notice of Availability of the Draft Environmental Impact

182

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: DOE Notice of Availability of the Draft Environmental 77: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power

183

EIS-0426: Draft Site-Wide Environmental Impact Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Site-Wide Environmental Impact Statement Draft Site-Wide Environmental Impact Statement EIS-0426: Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada Abstract: This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzes the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada Test Site) and other U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)-managed sites in Nevada, including the Remote

184

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 U.S. Department of Energy, Office of Nuclear Energy DOE/EIS-0396 Summary Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement October 2008 Summary Prepared by: DOE/EIS-0396 SUMMARY Summary GNEP Draft PEIS S-i Table of Contents S.1 INTRODUCTION................................................................................................................... 1 S.1.1 Purpose and Need for Agency Action ........................................................................ 3 S.1.1.1 Energy/Electricity ................................................................................................... 3 S.1.1.2 Spent Nuclear Fuel Disposal and Waste Reduction

185

Draft Environmental Impact Statement for the Disposal of Greater-Than-Class  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for the Disposal of Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste February 18, 2011 - 12:00pm Addthis WASHINGTON - The Department of Energy (DOE) has issued a Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste (LLRW) and GTCC-Like Waste (DOE/EIS-0375D, Draft EIS) as required under the National Environmental Policy Act for public review and comment. GTCC LLRW consists of a small volume of low-level radioactive waste generated throughout the United States as the result of Nuclear Regulatory Commission (NRC) and Agreement State licensed activities, including

186

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0346: EPA Notice of Availability of the Draft Environmental EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

187

EIS-0478: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental impacts of a RUS propoal to construct, operate, and maintain a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area...

188

EIS-0447: Draft Environmental Impact Statement | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Inc U.S. Department of Energy Press Release: DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project, June 30, 2010....

189

EIS-0250-S1: Draft Supplemental Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada DOE's...

190

EIS-0361: Draft Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement...

191

Draft Supplemental Programmatic Environmental Impact Statement on Stockpile Stewardship and Management for a Modern Pit Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modern Pit Facility Draft Environmental Impact Statement Modern Pit Facility Draft Environmental Impact Statement xii ACRONYMS AND ABBREVIATIONS AC/MC Analytical Chemistry and Materials Characterization ACHP Advisory Council on Historic Preservation ALARA as low as reasonably achievable ALOHA Aerial Location of Hazardous Atmospheres AQCR Air Quality Control Region ARF airborne release fraction Bison-m Biota Information System of New Mexico BLM Bureau of Land Management BLS Bureau of Labor Statistics BNM Bandelier National Monument CAA Clean Air Act CAIRS Computerized Accident/Incident Reporting System CD-0 critical decision on mission need CEQ Council on Environmental Quality CFR Code of Federal Regulations CGTO Consolidated Group of Tribes and Organizations

192

EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0365: Draft Environmental Impact Statement for the EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico

193

EIS-0379: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section...

194

EIS-0464: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture...

195

EIS-0355: EPA Notification of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the...

196

EIS-0391: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement Tank Closure and Waste...

197

EIS-0445: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0445: EPA Notice of Availability of the Draft Environmental Impact Statement Mountaineer Commercial Scale...

198

EIS-0373: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0373: EPA Notice of Availability of the Draft Environmental Impact Statement Proposed Consolidation...

199

EIS-0375: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of...

200

EIS-0409: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Draft Environmental Impact Statement Kemper County Integrated...

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0336: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and...

202

EIS-0394: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen Project...

203

EIS-0374: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Draft Environmental Impact Statement Klondike IIIBiglow Canyon...

204

EIS-0441: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0441: EPA Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm Project,...

205

EIS-0478: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0478: EPA Notice of Availability of a Draft Environmental Impact Statement Antelope Valley Station to...

206

EIS-0451: EPA Notice of Availability of a Draft Environmental...  

NLE Websites -- All DOE Office Websites (Extended Search)

51: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0451: EPA Notice of Availability of a Draft Environmental Impact Statement Hooper Springs Project,...

207

EIS-0346: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project,...

208

EIS-0387: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement Y-12 National Security...

209

EIS-0317: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement...

210

EIS-0422: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower...

211

EIS-0385: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the...

212

EIS-0399: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd....

213

EIS-0353: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout...

214

EIS-0441: Amended Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Availability of a Draft Environmental Impact Statement EIS-0441: Amended Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm...

215

EIS-0444: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0444: EPA Notice of Availability of the Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of...

216

EIS-0361: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project...

217

EIS-0409: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

409: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Draft Environmental Impact Statement Kemper County...

218

EIS-0394: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen Project Planning,...

219

EIS-0419: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact Statement Whistling Ridge Energy...

220

EIS-0469: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement EPA Notice of Availability...

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0359: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0359: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation...

222

EIS-0444: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0444: DOE Notice of Availability of the Draft Environmental Impact Statement...

223

EIS-0400: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard...

224

EIS-0421: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct,...

225

EIS-0414: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Environmental Impact Statement EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project,...

226

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

227

EIS-0360: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and

228

EIS-0440: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Environmental the Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and ancillary facilities would be on land administered by the Bureau of Land

229

Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.  

DOE Green Energy (OSTI)

Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

230

Yakima Fisheries Project : Revised Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

United States. Bonneville Power Administration.

1995-05-01T23:59:59.000Z

231

Draft Site-Wide Environmental Impact Statement Nevada Summary...  

National Nuclear Security Administration (NNSA)

Summary Draft | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

232

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY S-1 SUMMARY This environmental impact statement (EIS) has been prepared by the United States Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement manufacturing facility (the "Co- Production Facility"). The responsible organization for the federal action is the National Energy Technology Laboratory (NETL), a multi-purpose laboratory owned and operated by DOE. Proposed Action The Proposed Action is for DOE to decide whether to provide financial assistance to Western

233

Draft Environmental Impact Statement for the Orlando Gasification Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This environmental impact statement (EIS) has been prepared by the U.S. Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), Council on Environmental Quality regulations for implementing NEPA (40 CFR Parts 1500-1508), and DOE NEPA regulations (10 CFR Part 1021). The EIS evaluates the potential environmental impacts associated with the construction and operation of a project which was proposed by Southern Company in partnership with the Orlando Utilities Commission (OUC) and which has been selected by DOE under the Clean Coal Power Initiative (CCPI) program. The proposed project would demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC)

234

Public Hearing, DOE Release of DUF6 Conversion Facility Draft Environmental Impact Statements  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 UNITED STATES DEPARTMENT OF ENERGY 2 PUBLIC HEARING 3 4 SUBJECT: DOE Release of DUF6 Conversion 5 Facility Draft Environmental Impact Statements 6 DATE: January 13, 2004 7 LOCATION: Department of Energy 8 Environmental Information Center 115 Memorial Drive 9 Paducah, Kentucky 42001 10 TIME: 6:00 p.m. to 9:00 p.m. 11 FACILITATOR: Darryl Armstrong 12 REPORTED BY: Amy S. Caronongan, RPR, CSR 13 14 15 16 17

235

Summary: Draft Uranium Leasing Program Programmatic Environmental Impact Statement: DOE/EIS 0472-D, March 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary: Draft ULP PEIS March 2013 Summary: Draft ULP PEIS March 2013 COVER SHEET 1 2 3 Lead Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: The cooperating agencies are U.S. Department of the Interior (DOI), 6 Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado 7 Department of Transportation (CDOT); Colorado Division of Reclamation, Mining, and Safety 8 (CDRMS); Colorado Parks and Wildlife (CPW); Mesa County Commission; Montrose County 9 Commission; San Juan County Commission; San Miguel County Board of Commissioners; the 10 Pueblo of Acoma Tribe; the Pueblo de Cochiti Tribe; the Pueblo de Isleta Tribe; the Navajo 11 Nation; and the Southern Ute Indian Tribe. 12 13 Title: Draft Uranium Leasing Program Programmatic Environmental Impact Statement 14

236

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

237

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

238

Draft Environmental Impact Statement for the COB Energy Facility  

SciTech Connect

COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Corporation (PERC), proposes to construct a natural gas-fired, combined-cycle electric generating plant near Bonanza, Oregon. The Energy Facility would have a nominal generation capacity of 1,160 megawatts (MW). Electric power from the Energy Facility would enter the regional grid at the Bonneville Power Administration's (BPA's) Captain Jack Substation via a proposed 7.2-mile electric transmission line. BPA must decide whether to grant the interconnection required to connect this proposed transmission line to the Captain Jack Substation. In addition, the proposed transmission line would cross some Federal lands. The Bureau of Land Management (BLM) must decide whether to grant the necessary rights-of-way for the transmission line on approximately 44 acres of BLM land. Accordingly, BPA as the lead agency and BLM as the cooperating agency have prepared this environmental impact statement (EIS) to fulfill the requirements of the National Environmental Policy Act (NEPA). Electrical consumers in the Pacific Northwest and western states need increased power generation to serve increasing demand, and high-voltage transmission service to deliver that power. BPA will grant the interconnection if it will help to provide an adequate and reliable power supply for the region, consistent with BPA's environmental, social, and economic responsibilities. BPA intends to act consistently with its Open Access Transmission Tariff in considering the interconnection request. BLM will grant the rights-of-way if they will authorize appropriate uses of public land consistent with applicable planning documents.

N /A

2003-11-28T23:59:59.000Z

239

Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements (DOE/EIS-0385) (05/26/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

399 Federal Register 399 Federal Register / Vol. 71, No. 102 / Friday, May 26, 2006 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6675-6] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202-564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in the Federal Register dated April 7, 2006 (71 FR 17845). Draft EISs EIS No. 20060042, ERP No. D-NPS- E65079-TN, Great Smoky Mountains National Park General Management

240

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Draft Environmental Impact Statement for FutureGen Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0394D FUTUREGEN PROJECT EIS DOE/EIS-0394D FUTUREGEN PROJECT EIS DRAFT TABLE OF CONTENTS MAY 2007 i TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................ i LIST OF ACRONYMS ................................................................................... LIST OF ACRONYMS - 1 VOLUME I 1. PURPOSE AND NEED FOR AGENCY ACTION ......................................................................1-1 1.1 INTRODUCTION......................................................................................................................1-1 1.2 PROPOSED ACTION ...............................................................................................................1-1 1.3 PURPOSE AND NEED FOR AGENCY ACTION...................................................................1-2

242

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

243

DOE/EIS-03321: Condon Wind Project Draft Environmental Impact Statement (05/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Draft Environmental Impact Statement DOE/EIS-0321 CONDON WIND PROJECT Condon Wind Project Draft Environmental Impact Statement (DOE/EIS-0321) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Condon Wind Project States Involved: Oregon Abstract: BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource

244

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS i TABLE OF CONTENTS 1. PURPOSE AND NEED FOR THE AGENCY ACTION...............................................................1-1 1.1 INTRODUCTION.....................................................................................................................1-1 1.2 FEDERAL ACTION .................................................................................................................1-1 1.3 PURPOSE AND NEED ............................................................................................................1-3 1.3.1 Purpose of Action.........................................................................................................1-3 1.3.2 Need for Action ............................................................................................................1-3

245

Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

United States. Bonneville Power Administration.

1996-08-01T23:59:59.000Z

246

Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

Bonneville Power Administration, the Bureau of Indian Affairs, the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring, summer and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other watercourses throughout the Subbasin. The supplementation program differs from other hatchery programs because the fish would be released at different sizes and would return to reproduce naturally in the areas where they are released. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia River juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increase competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management.

United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho).

1996-06-01T23:59:59.000Z

247

DOE/EIS-0289; Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project, August 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA August 1999 U.S. DEPARTMENT OF ENERGY COVER SHEET August 1999 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, Federal Energy Technology Center, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@fetc.doe.gov.

248

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

249

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PADUCAH, KENTUCKY, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Paducah DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

250

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PORTSMOUTH, OHIO, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Portsmouth DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

251

DOE/EIS-0247; Draft Environmental Impact Statement Construction and Operation of the Spallation Neutron Source, December 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1998 December 1998 Construction and Operation of the S PALLATION N EUTRON S OURCE DRAFT ENVIRONMENTAL IMPACT STATEMENT U.S. Department of Energy Office of Science DOE/EIS-0247 Construction and Operation of the Spallation Neutron Source Facility Draft Environmental Impact Statement U.S. Department of Energy Office of Science December 1998 DOE/EIS-0247 Draft, December 1998 Cover Sheet COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS), Construction and Operation of the Spallation Neutron Source (DOE/EIS-0247) LOCATIONS OF ALTERNATIVE SITES: Illinois, New Mexico, New York, and Tennessee. CONTACT: For further information on this document, write or call: Mr. David Wilfert, EIS Document Manager U.S. Department of Energy Oak Ridge Operations Office

252

EIS-0442: EPA Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Statement Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on...

253

Draft Environmental Impact Report LAWRENCE BERKELEY NATIONAL LABORATORY  

E-Print Network (OSTI)

, Impacts, and Mitigation Measures IV-1 A. Aesthetics and Visual Quality IV.A-1 B. Air Quality IV.B-1 C. Utilities, Service Systems, and Energy IV.M-1 #12;Table of Contents Page LBNL LRDP EIR ii ESA / 201074 and Run-on to LBNL Site IV.G-5 IV.G-4 Strawberry Canyon Subwatersheds IV.G-6 IV.I-1 Noise Measurement

Lee, Jason R.

254

DOE/EIS-0395; San Luis Rio Colorado Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

note: Missing pages contain figures which can be found in the "Figures" folder note: Missing pages contain figures which can be found in the "Figures" folder on the San Luis Rio Colorado Project Draft Environmental Impact Statement compact disc (CD). Some of the figures were removed from this file to decrease file size for ease of downloading and/or viewing. San Luis Rio Colorado Project Draft EIS I S SUMMARY The U.S. Department of Energy (DOE) received applications from North Branch Resources, LLC (NBR) and Generadora del Desierto S.A. de C.V. (GDD) for the proposed San Luis Rio Colorado Project (Proposed Project). GDD and NBR (collectively termed the Applicants) are each wholly owned subsidiaries of North Branch Holding, LLC. GDD applied to the Office of Electricity Delivery and Energy Reliability (OE), an organizational unit within DOE, for a

255

Draft Environmental Impact Statement for the Quartzsite Solar Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quartzsite Solar Energy Quartzsite Solar Energy Project and Proposed Yuma Field Office p Resource Management Plan Amendment DOE/EIS - 0440 L d A Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management , Yuma Field Office U.S. Army Corps of Engineers U.S. Army Garrison, Yuma Proving Grounds A i D f E i l Q li Arizona Department of Environmental Quality Arizona Game and Fish Department October 2011 This page intentionally left blank. ABSTRACT Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration (Western) Cooperating Agencies: Bureau of Land Management (BLM) Yuma Field Office (YFO), U.S. Army Corps of Engineers, U.S. Army Garrison - Yuma Proving Grounds, Arizona Game and

256

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendices Appendices DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 SITING AND WETLAND 404(b)1 ALTERNATIVES ANALYSIS BP CHERRY POINT COGENERATION PROJECT [REVISED] Prepared for: BP West Coast Products, LLC Submitted by: Golder Associates Inc. March 2003 013-1421.541 March 2003 i 013-1421.541 TABLE OF CONTENTS Page No. 1. INTRODUCTION 1 2. PURPOSE AND NEED 5 3. ALTERNATIVES 6 3.1 No Action Alternative 6 3.1.1 Self-Reliance 6 3.1.2 Efficiency 6 3.1.3 Reliability 6 3.1.4 Other Impacts of the No Action Alternative 7 3.2 Project Site Location Alternative Selection Process 7 3.2.1 Sufficient Acreage Available

257

Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Summary and Chapters 1 - 7 May 2006 Draft Environmental Impact Statement for Site Selection for the Expansion of the Strategic Petroleum Reserve Document No. DOE/EIS-0385 Responsible Federal Agency: U.S. Department of Energy (DOE), Office of Petroleum Reserves Location: Potential new SPR storage sites are located in Lafourche Parish, Louisiana; Perry and Claiborne Counties, Mississippi; and Brazoria County, Texas. Existing Strategic Petroleum Reserve (SPR) storage sites that could be expanded are located in Cameron, Calcasieu, and Iberville Parishes, Louisiana; and Jefferson County, Texas. Associated pipelines, marine terminals, and other facilities that might be developed are located in East Baton Rouge, East Feliciana, St. James, Terrebonne, West Baton

258

Lincoln Electric Draft Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX E. DRAFT EA COMMENTS AND RESPONSES 2 Lincoln Electric Draft Environmental Assessment Comments and Responses Number Commenter Comment Summary Response 1. Euclid Historical...

259

Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.  

SciTech Connect

BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

260

Port Angeles-Juan de Fuca Transmission Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This summary includes information regarding the following elements of the draft environmental impact statement (EIS) prepared for the Port Angeles-Juan de Fuca Transmission Project: * purpose and need for action; * Proposed Action and No Action Alternative; and * affected environment, environmental impacts, and mitigation measures. S.1 Purpose and Need for Action Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Draft Environmental Impact Statement Klondike III/Biglow Canyon Wind Integration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary S-1 Summary S-1 Summary In this Summary: * Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the draft Environmental Impact Statement (EIS) prepared for the Klondike III/Biglow Canyon Wind Integration Project proposed by the Bonneville Power Administration (BPA). The project includes constructing a new double-circuit 230-kilovolt (kV) transmission line in northern Sherman County, Oregon. The new line would connect the Klondike III Wind Project and the Biglow Canyon Wind Farm to BPA's existing John Day 500-kV Substation. The project would also require expansion of BPA's existing John Day 500-kV Substation and a new 230-kV substation to integrate the two wind projects. As a federal agency, BPA is required by the National Environmental Policy Act

262

EIS-0473: EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0473: EPA Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2...

263

EIS-0460: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0460: DOE Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project,...

264

EIS-0365: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV...

265

EIS-0460: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0460: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project,...

266

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

267

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

268

EIS-0283DS Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Sheet Responsible Agency: United States Department of Energy (DOE) Title: Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement (Supplement) (DOE/EIS-0283-DS) Locations of Candidate Sites: Idaho, North Carolina, South Carolina, Texas, Virginia, and Washington Contacts: For further information on the Supplement contact: For further information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Office of Fissile Materials Disposition U.S. Department of Energy P.O. Box 23786 Washington, DC 20026-3786 Voice: (202) 586-5368 Ms. Carol Borgstrom, Director Office of NEPA Policy and Assistance Office of Environment, Safety and Health U.S. Department of Energy 1000 Independence Ave., SW

269

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESPONSIBLE AGENCY: United States Department of Energy (DOE) RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE/EIS-0396) CONTACT: For further information on this PEIS, For general information on the DOE National write or call: Environmental Policy Act (NEPA) process, write or call: Mr. Francis Schwartz Carol Borgstrom, Director GNEP PEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Office of Nuclear Energy, NE-5 U.S. Department of Energy U.S. Department of Energy 1000 Independence Avenue, SW 1000 Independence Avenue, SW Washington, DC 20585 Washington, DC 20585 (202) 586-4600 (866) 645-7803 or leave a message at 1-800-472-2756 Abstract: The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the

270

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

271

Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.  

DOE Green Energy (OSTI)

This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

United States. Bonneville Power Administration; Klickitat County (Wash.)

1995-03-01T23:59:59.000Z

272

DOE/EIS-0222 Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Executive Summary Cover Sheet 1 2 3 Lead Federal Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: U.S. Department of the Interior (Bureau of Land Management, 6 Bureau of Reclamation, and U.S. Fish and Wildlife Service); Benton, Franklin, and Grant 7 counties; and the City of Richland 8 9 Consulting Tribal Governments: Nez Perce Tribe Department of Environmental Restoration 10 and Waste Management and the Confederated Tribes of the Umatilla Indian Reservation 11 12 Title: Revised Draft Hanford Remedial Action Environmental Impact Statement and 13 Comprehensive Land-Use Plan (HRA-EIS), Hanford Site, Richland, Washington 14 15 Contacts: For further information on this EIS call or contact: 16 17 Thomas W. Ferns, HRA-EIS Document Manager 18 U.S. Department of Energy, Richland Operations Office

273

DOE/EIS-0303D; High-Level Waste Tank Closure Draft Environmental Impact Statement (November 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0303D EIS-0303D DRAFT November 2000 Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, High-Level Waste Tank Closure Draft Environmental Impact Statement (DOE/EIS-0303D), Aiken, SC. CONTACT: For additional information or to submit comments on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm For general information on the process that DOE follows in complying with the National Environmental

274

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

275

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California October 1999 [This page intentionally left blank.] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS CONTACT: For additional information on For general information on the NEPA this statement write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-293 Office of NEPA Policy and Assistance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW

276

ACTION: Environmental Assessment and Draft Finding of No Significant Impact. SUMMARY: The U.S. Nuclear Regulatory  

E-Print Network (OSTI)

Commission (NRC) has prepared an Environmental Assessment for the issuance of an Order under Section 274f of the Atomic Energy Act that would modify an Order issued to Waste Control Specialists, LLC (WCS) on November 5, 2004. In accordance with 10 CFR 51.33, the NRC has also prepared a draft Finding of No Significant Impact (FONSI) for public review and comment. The current action is in response to a request by

Licensing Requirements For Special

2007-01-01T23:59:59.000Z

277

EA-1919: Notice of Availability of a Draft Programmatic Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Programmatic Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating from Radiological Areas DOE announces the availability for public review and comment of the Draft Programmatic Environmental Assessment (PEA) for the Recycling of Scrap Metals Originating from Radiological Areas. This Draft PEA for the Recycling of Scrap Metals Originating from Radiological Areas analyzes the potential environmental impacts associated with resuming the clearance of scrap metal, originating from DOE radiological areas, for recycling pursuant to improved procedures designed to assure that clearance for release is limited to metals meeting stringent criteria. This Draft PEA

278

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

279

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

280

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spend Nuclear Fuel and High-Leval Radioactive Waste at Yucca Mountain, Nye County, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1D October 2007 Table of Contents Summary Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1D October 2007 Printed on recycled paper with soy ink. COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal

282

EIS-0464: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County,...

283

EIS-0397: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

284

EIS-0414: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the...

285

EIS-0377: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S....

286

EIS-0350: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

287

EIS-0383: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Orlando Gasification Project To Provide Cost-Shared Funding for Construction and Operation of Facilities...

288

EIS-0440: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt...

289

EIS-0440: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt...

290

EIS-0403-S1: Supplement to the Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

291

EIS-0455: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA EIS-0455-NOA-DEIS-2010.pdf More Documents &...

292

EIS-0439: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0439: EPA Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, California EIS-0439-EPANOA-2010.pdf More Documents &...

293

EIS-0439: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western)...

294

EIS-0350: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos,...

295

EIS-0435: EPA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Availability for the Draft Environmental Impact Statement for the...

296

EIS-0283-S1: Supplement to the Draft Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(April 1999) The Supplement evaluates the potential environmental impacts of using MOX fuel in these six specific reactors named in the DCS proposal as well as other program...

297

EIS-0281; Sandia National Laboratories/New Mexico, Draft Site-Wide Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Organization of the Site-Wide Environmental Impact Statement Organization of the Site-Wide Environmental Impact Statement The Site-Wide Environmental Impact Statement (SWEIS) is divided into a Summary and two volumes. The Summary provides an overview of material presented in the SWEIS, including background, purpose and need, alternatives, existing environment, and environmental impacts. Volume I analyzes the three alternatives (including the No Action Alternative) as they relate to U.S. Department of Energy (DOE) missions assigned to Sandia National Laboratories/New Mexico (SNL/NM): national security, energy resources, environmental quality, science and technology. Volume I contains 15 chapters. Chapter 1 provides introductory information on background, site missions, purpose and need, decisions to be made, related National Environmental Policy Act analyses, and public participation. Chapter 2

298

EA-1705: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan The frontier Project consists of the design, construction and operation of a biorefinery producing ethanol and other co-products from cellulosic materials utilizing a proprietary pretreatment and fermentation process. Draft Environmental Assessment and Notice of Wetland Involvement for the Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan, DOE/EA-1705 (February 2011) More Documents & Publications EA-1705: Final Environmental Assessment EA-1705: Finding of No Significant Impact Pacific Ethanol, Inc

299

Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report  

DOE Green Energy (OSTI)

The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

Not Available

1981-08-01T23:59:59.000Z

300

EA-1954: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

4: Draft Environmental Assessment 4: Draft Environmental Assessment EA-1954: Draft Environmental Assessment Resumption of Transient Testing of Nuclear Fuels and Materials at the Idaho National Laboratory, Idaho This EA evaluates the potential environmental impacts associated with DOE's proposed action to resume transient testing at INL's Transient Reactor Test Facility reactor approximately 38 miles west of Idaho Falls, Idaho or to start transient testing at SNL's Annular Core Research Reactor in Albuquerque, New Mexico. The draft EA identifies INL as the preferred location and describes DOE's reasons for identifying INL as the preferred location. EA-1954-DEA-2013.pdf More Documents & Publications EIS-0281: Draft Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

TITLE Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and  

E-Print Network (OSTI)

This Supplement to the Draft EIS (DOE/EIS-0357D-S1) is available on the Internet via the DOE National Environmental Policy Act (NEPA) web site at

unknown authors

2006-01-01T23:59:59.000Z

302

Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

Not Available

1994-07-01T23:59:59.000Z

303

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

this Supplement to the Draft EIS to correct information regarding carbon dioxide (CO2) emissions from the proposed Gilberton plant, to provide information on the...

304

EIS-0286: Revised Draft Environmental Import Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Revised Draft Environmental Import Statement 6: Revised Draft Environmental Import Statement EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington The revised draft of the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. DOE/EIS-0286, Richland Operations Office, Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington - Summary (March 2003) EIS-0286-D2-DEIS-01-2003.pdf EIS-0286-D2-DEIS-02-2003_0.pdf More Documents & Publications

305

EIS-0355: EPA Notification of Availability of the Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notification of Availability of the Draft EPA Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

306

Draft Complex Transformation Supplemental Programmatic Environmental Impact Statement (DOE/EIS-0236-S4) (1/11/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Federal Register 3 Federal Register / Vol. 73, No. 8 / Friday, January 11, 2008 / Notices Commission's Rules of Practice and Procedure. (G) The Secretary is directed to publish a copy of this order in the Federal Register. (H) The refund effective date in Docket No. EL08-8-000 established pursuant to section 206(b) of the Federal Power Act is 5 months from the date of the filing of the complaint. By the Commission. Kimberly D. Bose, Secretary. [FR Doc. E8-301 Filed 1-10-08; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Draft Complex Transformation Supplemental Programmatic Environmental Impact Statement AGENCY: National Nuclear Security Administration, U.S. Department of Energy. ACTION: Notice of Availability and Public Hearings.

307

EIS-0250-S1: Supplement to the Draft Environmental Impact Statement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada The Proposed Action addressed in the Draft EIS is to...

308

Sacramento Municipal Utility District, 100-MW photovoltaic power plant: draft environmental impact report  

SciTech Connect

The Sacramento Municipal Utility District proposes constructing a 100 MW solar photovoltaic electric generation facility adjacent to its Rancho Seco nuclear plant. After a brief description of the proposed facility, including the location and an explanation of the need for it, the project-specific environmental analysis is presented. This addresses: geology/seismicity, soils, biological resources, land use, air quality, water resources, water quality, wastes management, public/occupational health, safety, energy and material resources, cultural resources, socioeconomics, and aesthetics. For each of these areas, the setting is described, impacts analyzed, mitigation measures given where appropriate, and cumulative impacts described. Unavoidable adverse environmental effects, irreversible environmental changes and irretrievable commitments of energy and materials are summarized. Also briefly summarized is the relationship between local short-term use of the environment and the maintenance and enhancement of long-term productivity. Environmental benefits and disadvantages associated with various alternatives to building and operating the proposed solar photovoltaic power plant are described, considering project objectives other than producing electricity. (LEW)

Not Available

1982-02-01T23:59:59.000Z

309

Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)  

SciTech Connect

The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support project facilities in a safe and environmentally acceptable manner; and non-power generating alternatives, such as conservation and demand-side management.

None

1992-09-18T23:59:59.000Z

310

EA-1904: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the environmental...

311

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

312

EIS-0473: DOE Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the...

313

EA-1814: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1814: Draft Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System, Montpelier, Vermont The U.S. Department of Energy (DOE) is proposing to provide Federal funding through the Community Renewable Energy Deployment Program to the City of Montpelier for the design, permitting, and construction of a combined heat and power (CHP) and district energy system. This Draft EA analyzes the foreseeable environmental impacts of the proposed project and the alternative of not implementing this project (the No-Action Alternative), including the construction of a new heat plant and district energy system within a 100 year floodplain. Draft Environmental Assessment for City of Montpelier Combined Heat and

314

EA-1792: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This EA evaluates the environmental impacts of the Proposed Action and the No-Action Alternative; identifies unavoidable adverse environmental impacts of the Proposed Action; describes the relationship between local short-term uses of the environment and the maintenance and enhancement of long-term productivity; and characterizes any irreversible and irretrievable commitments of resources that would be involved should DOE decide to implement its Proposed Action. Draft Environmental Assessment for University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, DOE/EA-1792 (May

315

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2003 July 1, 2003 EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line June 6, 2003 EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement Stockpile Stewardship and Management for a Modern Pit Facility June 2, 2003 EIS-0345: Final Environmental Impact Statement Plymouth Generating Facility Plymouth, Washington June 2, 2003 EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project May 23, 2003 EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project May 15, 2003 EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los

316

EA-1792: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Assessment EA-1792: DOE Notice of Availability of the Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This draft EA to evaluate and describe the potential environmental impacts associated with the: University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine. Notice of Availability of the Draft Environmental Assessment for the University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine, DOE/EA-1792 (June 2011) More Documents & Publications EA-1792: DOE Notice of Availability of the Environmental Assessment and Finding of No Significant Impact

317

EA-1080: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1080: Draft Environmental Assessment Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System This environmental assessment (EA) evaluates the potential impacts of a proposed demonstration project to be cost-shared by DOE and NOXSO Corporation under the terms of Clean Coal Technology (CCT) Demonstration Program. The project would demonstrate the NOXSO flue gas treatment technology, which is designed to reduce sulfur dioxide (SO2) and nitrogen oxides (NOX) emissions from existing coal-fired electric generating units. Draft Environmental Assessment for the Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications EA-1080: Finding of No Significant Impact

318

Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center A Summary and Guide for Stakeholders DOE/EIS-0226-D (Revised) November 2008 The West Valley Site Availability of the Revised Draft EIS for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center For further information on this Draft EIS, or to request a copy please contact: Cathern Bohan, EIS Document Manager West Valley Demonstration Project U.S. Department of Energy Ashford Office Complex 9030 Route 219 West Valley, NY 14171 Telephone: 716-942-4159 Fax: 716-942-4703 E-mail: catherine.m.bohan@wv.doe.gov Printed with soy ink on recycled paper

319

Draft Supplemental Environmental Impact Statement for a Geologice Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mounta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

v v COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2D; the Nevada Rail Corridor SEIS), and Draft Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369D; the Rail Alignment EIS) CONTACTS: For more information about this document, write or call: For general information on the DOE NEPA process, write or call: U.S. Department of Energy Office of Civilian Radioactive Waste Management

320

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Bonneville Power Administration Transmission System Vegetation Management Program Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that fosters low-growing plant communities.

N /A

1999-08-20T23:59:59.000Z

322

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Draft Environmental Impact Statement  

DOE Green Energy (OSTI)

The Kentucky Pioneer IGCC Demonstration Project DEIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared financial support for construction and operation of an electrical power station demonstrating use of a Clean Coal Technology in Clark County, Kentucky. Under the Proposed Action, DOE would provide financial assistance, through a Cooperative Agreement with Kentucky Pioneer Energy, LLC, for design, construction, and operation of a 540 megawatt demonstration power station comprised of two synthesis gas-fired combined cycle units in Clark County, Kentucky. The station would also be comprised of a British Gas Lurgi (BGL) gasifier to produce synthesis gas from a co-feed of coal and refuse-derived fuel pellets and a high temperature molten carbonate fuel cell. The facility would be powered by the synthesis gas feed. The proposed project would consist of the following major components: (1) refuse-derived fuel pellets and coal receipt and storage facilities; (2) a gasification plant; (3) sulfur removal and recovery facilities; (4) an air separation plant; (5) a high-temperature molten carbonate fuel cell; and (6) two combined cycle generation units. The IGCC facility would be built to provide needed power capacity to central and eastern Kentucky. At a minimum, 50 percent of the high sulfur coal used would be from the Kentucky region. Two No Action Alternatives are analyzed in the DEIS. Under the No Action Alternative 1, DOE would not provide cost-shared funding for construction and operation of the proposed facility and no new facility would be built. Under the No Action Alternative 2, DOE would not provide any funding and, instead of the proposed demonstration project, Kentucky Pioneer Energy, LLC, a subsidiary of Global Energy, Inc., would construct and operate, a 540 megawatt natural gas-fired power station. Evaluation of impacts on land use, socioeconomics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, and environmental justice were included in the assessment.

N /A

2001-11-16T23:59:59.000Z

323

INITIAL ENVIRONMENTAL EXAMINATION (DRAFT)  

E-Print Network (OSTI)

The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADBs Board of Directors, Management, or staff, and may be preliminary in nature. Royal Government of Bhutan Asian Development Bank

I. Executive Summary

2010-01-01T23:59:59.000Z

324

Puget Sound Area Electric Reliability Plan. Appendix B : Local Generation Evaluation : Draft Environmental Impact Statement.  

SciTech Connect

The information and data contained in this Appendix was extracted from numerous sources. The principle sources used for technical data were Bonneville Power Administration's 1990 Resource Program along with its technical appendix, and Chapter 8 of the Draft 1991 Northwest Conservation and Electric Power Plan. All cost data is reported 1988 dollars unless otherwise noted. This information was supplemented by other data developed by Puget Sound utilities who participated on the Local Generation Team. Identifying generating resources available to the Puget Sound area involved a five step process: (1) listing all possible resources that might contribute power to the Puget Sound area, (2) characterizing the technology/resource status, cost and operating characteristics of these resources, (3) identifying exclusion criteria based on the needs of the overall Puget Sound Electric Reliability Plan study, (4) applying these criteria to the list of resources, and (5) summarizing of the costs and characteristics of the final list of resources. 15 refs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

325

Puget Sound Area Electric Reliability Plan. Appendix B : Local Generation Evaluation : Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

The information and data contained in this Appendix was extracted from numerous sources. The principle sources used for technical data were Bonneville Power Administration's 1990 Resource Program along with its technical appendix, and Chapter 8 of the Draft 1991 Northwest Conservation and Electric Power Plan. All cost data is reported 1988 dollars unless otherwise noted. This information was supplemented by other data developed by Puget Sound utilities who participated on the Local Generation Team. Identifying generating resources available to the Puget Sound area involved a five step process: (1) listing all possible resources that might contribute power to the Puget Sound area, (2) characterizing the technology/resource status, cost and operating characteristics of these resources, (3) identifying exclusion criteria based on the needs of the overall Puget Sound Electric Reliability Plan study, (4) applying these criteria to the list of resources, and (5) summarizing of the costs and characteristics of the final list of resources. 15 refs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

326

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project April 9, 2010 EIS-0404: Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California April 9, 2010 EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA April 1, 2010 EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota February 19, 2010 EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South January 29, 2010 EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury January 1, 2010 EIS-0418: Draft Environmental Impact Statement

327

EA-1886: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1886: Draft Environmental Assessment Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project, Shelby,...

328

EA-1932: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

329

EA-1917: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable...

330

EA-1903: Notice of Availability of Draft Environmental Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Availability of Draft Environmental Assessment EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project,...

331

EA-1566: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Assessment EA-1566: DOE Notice of Availability of the Draft Environmental Assessment Proposed Infrastructure Improvements for...

332

EA-1917: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces...

333

EA-1339: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: DOE Notice of Availability of the Draft Environmental Assessment Addendum EA-1339: DOE Notice of Availability of the Draft Environmental Assessment Addendum Disposition of...

334

EA-1809: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Environmental Assessment EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen...

335

EA-1790: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Assessment EA-1790: DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc,...

336

EA-1656: DOE Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Environmental Assessment EA-1656: DOE Notice of Availability of the Draft Environmental Assessment MARET Center Construction Project at...

337

EA-1929: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1929: Notice of Availability of a Draft Environmental Assessment NorthStar Medical Technologies LLC, Commercial...

338

EA-1919: Notice of Availability of a Draft Programmatic Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating...

339

EA-1922: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a Draft Environmental Assessment Combined Power and Biomass Heating System, Fort...

340

EA-1592: GSA Notice of Availability of the Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GSA Notice of Availability of the Draft Environmental Assessment EA-1592: GSA Notice of Availability of the Draft Environmental Assessment Modernization of Facilities and...

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EA-1900: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1900: Notice of Availability of a Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory...

342

EA-1922: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1922: Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska This DOE Draft EA, in cooperation with RUS and the...

343

EA-1861: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to...

344

EA-1665: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1665: Draft Environmental Assessment Davis-Kingman Tap 69-kV Transmission Line Rebuild, Mohave County, Arizona This Environmental Assessment (EA) evaluates the probable and known impacts to the environment from Western's Proposed Action, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with National Environmental Policy Act (NEPA) regulations published by the Council on Environmental Quality (CEQ) (40 CFR 1500-1508) and implementing procedures of DOE (10 CFR 1021). Western is the lead federal agency responsible for preparing the EA. The Department of Interior's (DOI) Bureau of Land Management (BLM) Kingman Field Office and Reclamation's Lower Colorado Regional Office are cooperating

345

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La...

346

EA-1912: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

347

EA-1948: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1948: Draft Environmental Assessment Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. EA-1948-DEA-2013.pdf More Documents & Publications CX-007149: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination

348

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

349

EA-1697: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1697: Draft Environmental Assessment Right-of-Way Maintenance in the San Joaquin Valley, California The Western Area Power Administration (Western) Sierra Nevada Region is a power marketing administration of the U.S. Department of Energy (DOE). As a Federal entity, Western is responsible for examining the potential environmental consequences of its proposed actions prior to making a decision or commitment to implement an action (see Section 1.5 for more information). This Environmental Assessment (EA) evaluates environmental impacts of the Proposed Action (San Joaquin Valley Right-of-Way Maintenance Project) and the No Action Alternative. EA-1697-DEA-2010.pdf More Documents & Publications EA-1697: Final Environmental Assessment

350

EA-1901: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Assessment 1: Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to support the Kootenai Tribe of Idaho's construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort. EA-1901-DEA-2013.pdf More Documents & Publications EA-1901: Final Environmental Assessment EA-1901: Finding of No Significant Impact EA-1901: Mitigation Action Plan

351

Environmental Impact  

U.S. Energy Information Administration (EIA)

Environmental Impact - a single comprehensive bibliographic information resource on climate change & other impacts of humans on the biosphere.

352

Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

o o n c e p t u a l D r a w i n g of t h e C M R R F a c i l i t y Draft Environmental Impact Statement For the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0350D May 2003 SUMMARY CMR Building TA-6 TA-55 U.S. Department of Energy National Nuclear Security Administration Los Alamos Site Office General questions regarding this EIS or for a copy of this EIS, please contact: AVAILABILITY OF THE DRAFT CMRR EIS Printed with soy ink on recycled paper Elizabeth Withers, EIS Document Manager U.S. Department of Energy Office of Los Alamos Site Operations 528 35th Street Los Alamos, New Mexico 87544-2201 Telephone: 1-877-491-4957 National Nuclear Security Administration iii COVER SHEET Responsible Agency: United States Department of Energy (DOE), National Nuclear Security

353

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

354

Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement (DOE/EIS-0317) (January 10, 2003)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Federal Register / Vol. 68, No. 7 / Friday, January 10, 2003 / Notices authorized to administer the NPDES Program incur a burden of 92,033 hours annually. Dated: January 6, 2003. James A. Hanlon, Director, Office of Wastewater Management. [FR Doc. 03-516 Filed 1-9-03; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6636-6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed December 30, 2002 Through January 03, 2003 Pursuant to 40 CFR 1506.9. EIS No. 030000, DRAFT EIS, FHW, TX, TX-121 Highway from Interstate Highway 30 to Farm-to-Market 1187 (FM 1187) in Forth Worth,

355

Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spend Nuclear Fuel and High-Leval Radioactive Waste at Yucca Mountain, Nye County, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Volume I Impact Analyses Chapters 1 through 13 U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1D October 2007 Printed on recycled paper with soy ink. COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada (DOE/EIS-0250F-S1D) (Repository SEIS). CONTACTS: For more information about this document, For general information on the DOE NEPA process, write

356

DOE/EIS-0357D-S1: Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (12/26/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0357D-S1 EIS-0357D-S1 SUPPLEMENT TO THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE GILBERTON COAL-TO-CLEAN FUELS AND POWER PROJECT GILBERTON, PENNSYLVANIA December 2006 U.S. DEPARTMENT OF ENERGY i COVER SHEET December 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Supplement to the Draft Environmental Impact Statement for the Gilberton Coal -to-Clean Fuels and Power Project (DOE/EIS-0357D-S1) LOCATION Gilberton, Pennsylvania CONTACTS Additional copies or information concerning this Supplement to the Draft Environmental Impact Statement (EIS) can be obtained from Ms. Janice L. Bell, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-4512.

357

EA-1870: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this Environmental Assessment (EA) to evaluate the potential impacts of providing financial assistance to Viresco Energy, LLC, (Viresco) for its construction and operation of a Coal and Biomass Fueled Pilot Plant, that would be located in Kanab, Utah. The plant would be located on land leased to Viresco by the Utah School and Institutional Trust Lands Administration. The Pilot Plant would occupy approximately 1.5 acres of a 10-acre site located approximately 2.5 miles south of the downtown area of Kanab, Utah. EA-1870-DEA-2011d_0.pdf More Documents & Publications EA-1870: Finding of No Significant Impact

358

EIS-0344: Draft Envrionmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Draft Envrionmental Impact Statement 4: Draft Envrionmental Impact Statement EIS-0344: Draft Envrionmental Impact Statement Grand Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project. Bonnewille Power Administration (BPA) would construct a new 500-kilovolt (kV) transmission line that would replace a single-circuit 115-kV transmission line in an exisiting corridor that has multiple transmission lines for most of the project's length. The transmission line would extend between the Grand Coulee 600-kV Switchyard and Bell Substation near Spokane, a distance of 84 miles. Detailed information about the project and its environmental impacts

359

EA-1947: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri The National Nuclear Security Administration (NNSA) is preparing this Environmental Assessment (EA) to evaluate the potential environmental impacts of transferring the Kansas City Plant (KCP) to one or more entities for a use that is different from its current use. Transfer includes sale or lease of the property in whole or in part. This EA will provide NNSA with the information needed to make an informed decision about the transfer of the KCP property, which is on the Bannister Federal Complex (BFC) located within the city limits of Kansas City, Missouri. NNSA believes the transfer of this property would benefit NNSA and the local economic area.

360

EA-1885: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1885: Draft Environmental Assessment Boston Architectural College's (BAC) Urban Sustainability Initiative for the Renovation of Public Alley #444, Boston, MA (December 2011) DOE prepared this EA to evaluate the potential environmental consequences of providing a $1.6 million grant to Boston Architectural College (BAC) for its Urban Sustainability Initiative for the Renovation of Public Alley #444. The financial assistance proposed would be in the form of cost-shared funding, based on a FY2010 congressional earmark. This EA analyzes the potential environmental impacts of DOE's proposed action of providing the grant funding and of the No-Action Alternative. EA-1885-DEA-2011.pdf EA-1885-DearReaderLetter-2011.pdf More Documents & Publications

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Site-Wide DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a separately-organized agency within the Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security Complex (Draft Y-12 SWEIS, DOE/EIS-0387) (74 FR 56189) (October 2009) National Nuclear Security Administration Notice of Availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security Complex, EIS-0387(October 2009) More Documents & Publications EIS-0387: Record of Decision

362

Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Searchlight Wind Energy Project NVN-084626 and NVN-086777 DES 11-52 Bureau of Land Management Las Vegas Field Office in cooperation with Western Area Power Administration National Park Service January 2012 BLM Mission Statement It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and enjoyment of present and future generations. Under Section 508 of the Rehabilitation Act of 1973, the Department of the Interior must insure that electronic and information technology allows individuals with disabilities (Federal employees and members of the public) access to and use of information and data that is comparable to individuals without disabilities. If you would like an electronic copy of this document that meets 508 compliance

363

DOE/EIS-0305-D; Draft Environmental Impact Statement for Treating Transuranic/Alpha Low-Level Waste at the Oak Ridge National Laboratory Oak Ridge, Tennessee (February 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

05-D 05-D DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) FOR TREATING TRANSURANIC (TRU)/ALPHA LOW-LEVEL WASTE AT THE OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE February 2000 TRU Waste Treatment Project, DRAFT Environmental Impact Statement COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (EIS) for Treating Transuranic (TRU)/Alpha Low-Level Waste at the Oak Ridge National Laboratory, Oak Ridge, Tennessee CONTACT: For further information on this document, write or call: Dr. Clayton Gist, Waste Management Integration Team Leader U.S. Department of Energy Oak Ridge Operations 55 Jefferson Avenue P. O. Box 2001 Oak Ridge, TN 37831 Telephone: (865) 241-3498 * Facsimile: (865) 576-5333 * E-Mail: gistcs@oro.doe.gov

364

EA-1931: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

365

DOE/EA-1697 Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment for Right-of-Way Maintenance in the San Joaquin Valley, California June 2010 Prepared for: Western Area Power Administration, Sierra Nevada Region San Joaquin Valley ROW Maintenance EA June 2010 iii Draft EA CONTENTS 1.0 PURPOSE AND NEED FOR ACTION ...................................................................... 1-1 1.1 Introduction ............................................................................................. 1-1 1.2 Background ............................................................................................. 1-1 1.3 Purpose and Need for Action .................................................................. 1-3 1.4 Location and Project Area Description .................................................... 1-4

366

EA-1752: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

52: Draft Environmental Assessment 52: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

367

EA-1921: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1921: Draft Environmental Assessment The Bureau of Land Management (BLM)(lead agency) and DOE are jointly preparing this EA, which evaluates the potential environmental impacts of a project proposed by Rockwood Lithium Inc (Rockwood), formerly doing business as Chemetall Foote Corporation. Rockwood has submitted to the BLM, Tonopah Field Office, an Operations Plan for the construction, operation, and maintenance of the Silver Peak Area Geothermal Exploration Project within Esmeralda County, Nevada. The purpose of the project is to determine subsurface temperatures, confirm the existence of geothermal resources, and confirm the existence of a commercial geothermal reservoir at the proposed well sites within federal geothermal lease N-87008. The proposed project

368

EA-1895: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Draft Environmental Assessment 5: Draft Environmental Assessment EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis. EA-1895-DEA-2013.pdf More Documents & Publications

369

EA-1642S: Supplemental Draft Environmental Assessment | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky This EA evaluates the potential environmental impacts of DOE providing financial assistance to the University of Kentucky (UK) Center for Applied Energy Research (CAER) to partially fund the completion of the design, construction and operation of a small-scale pilot plant for research related to the gasification of coal and coal-biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch (FT) synthesis. This project is intended to evaluate the commercial and technical viability of

370

EA-1752: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

752: Draft Environmental Assessment 752: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

371

EA-1778: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1778: Draft Environmental Assessment Proposed Rule, 10 CFR Part 433: Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings and 10 CFR Part 435, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Low-Rise Residential Buildings". This EA evaluates the environmental impacts of of DOE's Proposed Rule, 10 CFR Part 433, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings" and

372

Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (12/01/06))  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

62 Federal Register 62 Federal Register / Vol. 71, No. 231 / Friday, December 1, 2006 / Notices Route to Construct and Reconstruct Roads, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA. Summary: EPA expressed environmental concerns about water resource impacts, and requested that information about water resources be updated. EPA is also expressed concern about monitoring and mitigation issues. Rating EC2. EIS No. 20060347, ERP No. D-BLM- L70014-ID, Cottonwood Resource Management Plan, Implementation, Latah, Clearwater, Nez Perce, Lewis, Idaho and Adams Counties, ID. Summary: EPA expressed environmental concerns about water quality/source water protection impacts and monitoring/maintaining old growth

373

EPA Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (02/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Federal Register 9 Federal Register / Vol. 73, No. 32 / Friday, February 15, 2008 / Notices counties, UT, Montrose County, CO, and Uinta County, WY. Summary: EPA has environmental concerns about potential water quality impacts and recommends that the final EIS evaluate and compare the environmental impacts by alternative, of removing interim protections from the 86 eligible stream segments. Rating EC1. Final EISs EIS No. 20070530, ERP No. F-COE- E39071-00, Wolf Creek Dam/Lake Cumberland Project, Emergency Measures in Response to Seepage, Mississippi River, South Central Kentucky and Central Tennessee. Summary: EPA continues to have environmental concerns about water quantity and water quality impacts. EIS No. 20070556, ERP No. F-NGB- E11062-MS, Camp Shelby Joint Force

374

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2002 May 1, 2002 EIS-0303: Final Environmental Impact Statement High-Level Waste Tank Closure March 1, 2002 EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington February 1, 2002 EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project February 1, 2002 EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project January 1, 2002 EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm November 1, 2001 EIS-0309: Final Site-Wide Environmental Impact Statement Oak Ridge Y-12 Plant August 1, 2001 EIS-0319: Draft Environmental Impact Statement Proposed Relocation or Technical Area 18 Capabilities and Material at Los Alamos National Lab

375

EIS-0374: Final Environmental Impact Statement | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft Environmental...

376

EIS-0286: EPA Notice of Availability of the Revised Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0286: EPA Notice of Availability of the Revised Draft EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program Notice of Availability of the Revised Draft Environmental Impact Statement for the Hanford Site Solid (Radioactive and Hazardous) Waste Program, New Information on Waste Management Alternatives, Waste Management Practices Enhancement for Low-Level Radioactive Waste, Mixed Low-Level Radioactive Waste and Transuranic Waste, Richard, Benton County, Washington. Notice of Availability of the Revised Draft Environmental Impact Statement for the Hanford Site Solid (Radioactive and Hazardous) Waste Program, DOE/EIS-0286 (April 2003)

377

DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (DOE/EIS-0357D-S1)(01/16/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Federal Register 0 Federal Register / Vol. 72, No. 9 / Tuesday, January 16, 2007 / Notices Dated: December 19, 2006. M. A. Harvison, Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 07-115 Filed 1-12-07; 8:45 am] BILLING CODE 3810-FF-M DEPARTMENT OF ENERGY Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project AGENCY: Department of Energy. ACTION: Notice of availability. SUMMARY: The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft

378

EA-1773: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: DOE Notice of Availability of the Draft Environmental 3: DOE Notice of Availability of the Draft Environmental Assessment EA-1773: DOE Notice of Availability of the Draft Environmental Assessment Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the: Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Notice of Availability of the Draft Environmental Assessment for the Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida, DOE/EA-1773 (August 2010) More Documents & Publications EA-1772: Finding of No Significant Impact CX-001234: Categorical Exclusion Determination

379

EA-1773: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1773: DOE Notice of Availability of the Draft Environmental EA-1773: DOE Notice of Availability of the Draft Environmental Assessment EA-1773: DOE Notice of Availability of the Draft Environmental Assessment Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the: Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Notice of Availability of the Draft Environmental Assessment for the Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida, DOE/EA-1773 (August 2010) More Documents & Publications EA-1772: Finding of No Significant Impact CX-001234: Categorical Exclusion Determination

380

Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

..viii ..viii List of Tables..............................................................................................................................................................viii Acronyms, Abbreviations, and Conversion Charts ...................................................................................................... xi S.1 Background ...................................................................................................................................................S-1 S.2 Purpose and Need for Agency Action..........................................................................................................S-4 S.3 Scope of the New Site-Wide Environmental Impact Statement................................................................S-5

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0468: Final Environmental Impact Statement Proposed American Centrifuge Plant in Piketon, Ohio Pike County, Ohio April 29, 2011 EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico March 25, 2011 EIS-0458: Draft Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA March 18, 2011 EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas March 11, 2011 EIS-0445: Draft Environmental Impact Statement

382

Notice of Availability for the National Ignition Facility Draft Supplemental Environmental Impact Statement (11/5/99)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30 30 Federal Register / Vol. 64, No. 214 / Friday, November 5, 1999 / Notices natural or human environment. Because no significant environmental impacts will result from implementation of the proposed action, an Environmental Impact Statement is not required and will not be prepared. The Army will not initiate the proposed action for 15 days following the completion of the EA and FNSI and publication of a public notice in a local newspaper. This EA is available for review at the following repositories: Lassen Community College Library, Highway 139, P.O. Box 3000, Susanville, CA 96130; Lassen County Public Works, 707 Nevada Street, Suite 2, Susanville, CA 96130; and the Washoe County Library, Downtown Branch, 301 South Center Street, Reno NV 89501. Dated: November 1, 1999.

383

Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk  

Science Conference Proceedings (OSTI)

Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

NONE

1995-08-01T23:59:59.000Z

384

Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 1, Summary  

Science Conference Proceedings (OSTI)

This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public.

Not Available

1991-04-01T23:59:59.000Z

385

EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Draft Site-Wide DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada The National Nuclear Security Administration (NNSA), a separately organized semi-autonomous agency within the U.S. Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (Draft SWEIS, DOE/EIS-0426D) for public review, as well as the locations, dates and

386

EA-1960: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western Area...

387

EA-1923: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA...

388

EA-1903: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1903: Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas This EA evaluates the potential environmental...

389

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 28, 2010 May 28, 2010 EIS-0419: EPA Notice of Availability of the Draft Environmental Impact Statement Whistling Ridge Energy Project, Construction and Operation of a 75-megawatt Wind Turbine Facility, City of White Salmon, Skamania County, WA May 13, 2010 EA-1707: Draft Environmental Assessment Closure of Nonradioactive Dangerous Waste Landfill and Solid Waste Landfill, Hanford Site, Richland, Washington April 9, 2010 EIS-0404: EPA Notice of Availability of the Final Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California April 9, 2010 EIS-0455: Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA April 9, 2010 EIS-0455: EPA Notice of Availability of the Draft Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA

390

EIS-0408: EPA Notice of Availability of a Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Upper...

391

EIS-0472: EPA Notice of Availability of a Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement...

392

EIS-0250: EPA Notice of Availability of the Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement...

393

EIS-0472: DOE Notice of Availability of a Draft Programmatic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement...

394

EIS-0408: DOE Notice of Availability of a Programmatic Draft...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE...

395

Northeast Corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. to Boston, MA. Volume 3. Technical appendices. Final report, September 1992-September 1993  

SciTech Connect

The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 x 25,000 volt - 60 hertz power system. The volume Number III contains the detailed technical studies that were performed in order to identify and evaluate the environmental impacts of the proposed project. Some of these studies have been included entirely in the Draft Environmental Impact Statements-draft (DEIS/R) (Volume 1). The technical evaluations performed were based upon regulatory requirements as well as substantive issues raised by individuals and public agencies as part of the public participation program.

Not Available

1993-09-01T23:59:59.000Z

396

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08: DOE Notice of Availability of a Programmatic Draft 08: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

397

EIS-0226: DOE Notice of Availability of the Revised Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: DOE Notice of Availability of the Revised Draft 6: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) and the New York State Energy Research and Development Authority (NYSERDA) are announcing their intent to prepare an Environmental Impact Statement (EIS) for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project (WVDP) and Western New York Nuclear Service Center (also known as the ''Center''). DOE/EIS-0226, Notice of Availability of the Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the

398

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Notice of Availability of a Programmatic Draft DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

399

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

DOE Green Energy (OSTI)

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). Although not part of the proposed action, an option of shipping all cylinders (DUF{sub 6}, low-enriched UF{sub 6} [LEU-UF{sub 6}], and empty) stored at the East Tennessee Technology Park (ETTP) near Oak Ridge, Tennessee, to Paducah rather than to Portsmouth is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Paducah site. A separate EIS (DOE/EIS-0360) evaluates the potential environmental impacts for the proposed Portsmouth conversion facility.

N /A

2003-11-28T23:59:59.000Z

400

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site  

DOE Green Energy (OSTI)

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Portsmouth site in Ohio (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Portsmouth to a more stable chemical form suitable for use or disposal. The facility would also convert the DUF{sub 6} from the East Tennessee Technology Park (ETTP) site near Oak Ridge, Tennessee. In a Notice of Intent (NOI) published in the Federal Register on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (United States Code, Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (Code of Federal Regulations, Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a Federal Register Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Portsmouth site; from the transportation of all ETTP cylinders (DUF{sub 6}, low-enriched UF6 [LEU-UF{sub 6}], and empty) to Portsmouth; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). An option of shipping the ETTP cylinders to Paducah is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Portsmouth and ETTP sites. A separate EIS (DOE/EIS-0359) evaluates potential environmental impacts for the proposed Paducah conversion facility.

N /A

2003-11-28T23:59:59.000Z

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D  

SciTech Connect

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

402

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16  

SciTech Connect

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

403

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A  

Science Conference Proceedings (OSTI)

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

404

Destin Dome 56 Unit development and production plan and right-of-way pipeline application: Draft environmental impact statement. Volume 1: Sections 1--10  

SciTech Connect

The MMS prepared this environmental impact statement (EIS) on Chevron`s plan to drill 20 new wells within the Destin Dome (DD) 56 Unit, to produce up to 450 trillion cubic feet of natural gas per day, and to transport the gas through pipelines to processing plants in Alabama. Volume 1---Section 1 states the reasons for the proposed development of the DD 56 Unit and describes the plan and pipeline in detail. Section 2 describes the proposal, the alternatives, and the mitigation measures. Section 3 describes the physical, biological, and social resources within the DD 56 Unit and in areas from Pascadoula, Mississippi, to Cape San Blas, Florida, that might be affected if Chevron is allowed to go ahead with the plan. This descriptive background information gives the status of these reasons as they are now. Section 4 analyzes the environmental effects that could be anticipated from Chevron`s plan, and a separate analysis of possible and expected effects is done for the resources described in Section 3. Section 5 discusses how the Draft EIS was developed and distributed. Section 6 lists the references cited in the main text. Section 7 lists the people who wrote and worked on the EIS. Section 8 is a glossary of terms used. Section 9 (Appendices) contains technical information, including descriptions of the geology and physical oceanography of the DD 56 Unit.

NONE

1999-08-20T23:59:59.000Z

405

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-1-1 E-1-1 APPENDIX E TECHNICAL METHODOLOGIES AND KEY DATA E-1 SOCIOECONOMICS E-1.1 Methodology and Key Assumptions for Socioeconomics The socioeconomic impact analysis evaluates both the impacts on regional economic activity, as measured by changes in employment and earnings, and the impacts on communities surrounding Idaho National Engineering and Environmental Laboratory (INEEL), as measured by changes in population and the demand for housing and public services. The study area comprises a seven-county Region of Influence (ROI) and socioeconomic impacts are estimated for each of the proposed Advanced Mixed Waste Treatment Project (AMWTP) alternatives. The methodology employed for the AMWTP Environmental Impact Statement (EIS) is similar to that used in the Programmatic Spent Nuclear Fuel Management and

406

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Paducah DUF 6 DEIS: December 2003 SUMMARY S.1 INTRODUCTION This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the Federal Register (FR) on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth,

407

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 6, 2012 December 6, 2012 EIS-0391: Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA October 5, 2012 EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY September 20, 2012 EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas July 25, 2012 EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31, 2012 EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County,

408

EIS-0391: Supplement Analysis of an Environmental Impact Statement...  

NLE Websites -- All DOE Office Websites (Extended Search)

of an Environmental Impact Statement Draft Tank Closure and Waste Management for the Hanford Site, Richland, WA Based on the analyses in this SA, DOE concluded that updated,...

409

DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375D)(February 2011)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement for the Volume 1: Chapters 1 through 8 February 2011 Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D) T H E U.S. D E P A R T M E N T O F E N E R G Y ENERGY U.S. DEPARTMENT OF On the cover: The photographs on the front cover are, from left to right: glove boxes contaminated with GTCC Other Waste, abandoned Am-241 and Cs-137 gauges and shipping shields, and disused well logging sources being loaded into a 55-gallon drum. Draft GTCC EIS Cover Sheet COVER SHEET Lead Agency: U.S. Department of Energy (DOE) Cooperating Agency: U.S. Environmental Protection Agency (EPA) Title: Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D)

410

Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 1 - Chapters U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Draft Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 1 - Chapters U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 DOE/EIS-0407D COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

411

EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Intent to Prepare a Supplemental Draft Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota Western Area Power Administration is evaluating the potential environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to Western's existing Wilton/Baldwin substation and allowing NextEra's existing wind projects in this area to operate above 50 annual MW. Western is preparing a Supplemental Draft EIS to address substantial changes to the proposal, including 30 turbine locations and 5 alternate turbine locations in Crofte Township.

412

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

440: DOE and EPA Notice of Availability of a Draft 440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

413

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: DOE and EPA Notice of Availability of a Draft 40: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

414

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B  

SciTech Connect

Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

1994-06-01T23:59:59.000Z

415

EA-1925: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1925: Draft Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOE...

416

EA-1890: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1890: Draft Environmental Assessment Reedsport Deployment and Ocean Test Project The scope of the DOE Reedsport Deployment and Ocean Test project...

417

EA-1741: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1741: Draft Environmental Assessment Seattle Steam Company Combined Heat and Power at Post Street in Downtown Seattle, Washington (June 2010) This EA...

418

EA-1892: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1892: Draft Environmental Assessment Direct Final Rule Energy Conservation Standards for Residential Furnaces and Residential Central Air Conditioners & Heat...

419

Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0380) (08/31/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Federal Register 10 Federal Register / Vol. 71, No. 169 / Thursday, August 31, 2006 / Notices Coordinator, at the address and phone number listed above. Issued at Washington, DC on August 24, 2006. Carol Matthews, Acting Advisory Committee Management Officer. [FR Doc. 06-7304 Filed 8-30-06; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). ACTION: Notice of comment period extension. SUMMARY: On July 7, 2006, NNSA published a Notice of Availability for the Draft Site-wide Environmental

420

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

422

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) of NEPA for a proposed major Federal action significantly affecting the quality of the human environment. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1999 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington August 1, 1999 EIS-0285: Draft Environmental Impact Statement Bonneville Power Administration Transmission System Vegetation Management Program (August 1999) August 1, 1999 EIS-0289: Draft Environmental Impact Statement

423

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 25, 2005 November 25, 2005 EIS-0372: Final Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect September 1, 2005 EIS-0351: Final Environmental Impact Statement Operation of Flaming Gorge Dam August 26, 2005 EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect August 5, 2005 EIS-0355: Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah July 1, 2005 EIS-0353: Final Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program April 29, 2005 EIS-0348: Final Site-wide Environmental Impact Statement Continued Operation of Lawrence Livermore National Laboratory and

424

Draft Surplus Plutonium Disposition Supplemental Environmental...  

National Nuclear Security Administration (NNSA)

DOE could decide, based on programmatic, engineering, facility safety, cost, and schedule information, and on the environmental impact analysis in this SPD Supplemental EIS, which...

425

EIS-0286: EPA Notice of Availability of the Revised Draft Environmenta...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Draft Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Revised Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous)...

426

EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

427

EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental...  

NLE Websites -- All DOE Office Websites (Extended Search)

33-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact...

428

Public Invited to Comment on Draft Environmental Assessment for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office NOTICE: DOE has extended the public comment period on its Draft Environmental Assessment for Resumption of Transient Testing of Nuclear Fuels and Materials to January 10, 2014. The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National

429

DOE/EIS-0250D; Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy (DOE) U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada CONTACT: For more information on this Environmental Impact Statement (EIS), write or call: Wendy R. Dixon, EIS Project Manager Yucca Mountain Site Characterization Office Office of Civilian Radioactive Waste Management U.S. Department of Energy P.O. Box 30307, Mail Stop 010 North Las Vegas, Nevada 89036-0307 Telephone: (800) 967-3477 The EIS is also available on the Internet at the Yucca Mountain Project website at http://www.ymp.gov and on the DOE National Environmental Policy Act (NEPA) website at http://tis.eh.doe.gov/nepa/. For general information on the DOE NEPA process, write or call:

430

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 1, 2007 November 1, 2007 EIS-0389: Final Environmental Impact Statement Trinity Public Utilities District Direct Interconnection Project November 1, 2007 EIS-0394: Final Environmental Impact Statement FutureGen Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 12, 2007 EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor October 1, 2007 EIS-0357: Final Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania October 1, 2007 EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project

431

EA-1889: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Draft Environmental Assessment 9: Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the Navy has prepared a Draft Environmental Assessment (EA) on the Disposal of Decommissioned, Defueled, Naval Reactor Plants from the USS Enterprise. The world's first nuclear-powered naval aircraft carrier, Enterprise, is scheduled for decommissioning in 2013, following 51 consecutive years of service. Because the preferred alternative is to dispose of the Enterprise reactor plants at the Department of Energy's Hanford Site*, the Department of Energy is a cooperating agency for this EA. For additional information on the Draft Enterprise EA, please contact Mary Mascianica at (360) 476-7111.

432

EA-1806: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Draft Environmental Assessment 6: Draft Environmental Assessment EA-1806: Draft Environmental Assessment Libman Company Wind Energy Project Arcola, Douglas County, Illinois The U.S. Department of Energy (DOE) has provided a grant to the State of Illinois and is proposing to authorize the expenditure of Federal funding to design, permit, and construct the Libman Wind Energy Project, a proposed 1.5 megawatt (MW) wind turbine to be located north of the Libman manufacturing facility in Arcola, Douglas County, Illinois. Draft Environmental Assessment for the Libman Company Wind Energy Project Arcola, Douglas County, Illinois, DOE/EA-1806 (November 2010) More Documents & Publications EA-1804: Final Environmental Assessment EA-1859: Final Environmental Assessment EA-1818: Final Environmental Assessment

433

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast Reliability Interconnect DEIS Northeast Reliability Interconnect DEIS S-1 August 2005 SUMMARY S.1 BACKGROUND S.1.1 Purpose and Need for National Environmental Policy Act Review Executive Order (E.O.) 10485 (September 9, 1953), as amended by E.O. 12038 (February 7, 1978), requires that a Presidential permit be issued by the U.S. Department of Energy (DOE) before electric transmission facilities may be constructed, operated, maintained, or connected at the U.S. international border. Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit, 345,000-volt (345-kV) alternating-current (AC) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine.

434

Agencies Publish Final Environmental Impact Statement On Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement On Energy Final Environmental Impact Statement On Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West More Documents & Publications Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007.

435

Draft environmental impact report. California Department of Water Resources, Bottle Rock geothermal power plant, Lake County, CA  

SciTech Connect

The California Department of Water Resources (DWR) proposes to construct the Bottle Rock power plant, a 55 MW geothermal power plant, at The Geysers Known Geothermal Resource Area (KGRA). The plant is projected to begin operation in April of 1983, and will be located in Lake County near the Sonoma County line on approximately 7.2 acres of the Francisco leasehold. The steam to operate the power plant, approximately 1,000,000 pounds/h, will be provided by McCulloch Geothermal Corporation. The power plant's appearance and operation will be basically the same as the units in operation or under construction in the KGRA. The power plant and related facilities will consist of a 55 MW turbine generator, a 1.1 mile (1.81 km) long transmission line, a condensing system, cooling tower, electrical switchyard, gas storage facility, cistern, and an atmospheric emission control system. DWR plans to abate hydrogen sulfide (H/sub 2/S) emissions through the use of the Stretford Process which scrubs the H/sub 2/S from the condenser vent gas stream and catalytically oxides the gas to elemental sulfur. If the Stretford Process does not meet emission limitations, a secondary H/sub 2/S abatement system using hydrogen peroxide/iron catalyst is proposed. The Bottle Rock project and other existing and future geothermal projects in the KGRA may result in cumulative impacts to soils, biological resources, water quality, geothermal steam resources, air quality, public health, land use, recreation, cultural resources, and aesthetics.

1979-12-01T23:59:59.000Z

436

Puget Sound Area Electric Reliability Plan. Appendix D, Conservation, Load Management and Fuel Switching Analysis : Draft Environmental Impact Statement.  

SciTech Connect

Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

437

Draft environmental impact report. California Department of Water Resources, Bottle Rock geothermal power plant, Lake County, CA  

DOE Green Energy (OSTI)

The California Department of Water Resources (DWR) proposes to construct the Bottle Rock power plant, a 55 MW geothermal power plant, at The Geysers Known Geothermal Resource Area (KGRA). The plant is projected to begin operation in April of 1983, and will be located in Lake County near the Sonoma County line on approximately 7.2 acres of the Francisco leasehold. The steam to operate the power plant, approximately 1,000,000 pounds/h, will be provided by McCulloch Geothermal Corporation. The power plant's appearance and operation will be basically the same as the units in operation or under construction in the KGRA. The power plant and related facilities will consist of a 55 MW turbine generator, a 1.1 mile (1.81 km) long transmission line, a condensing system, cooling tower, electrical switchyard, gas storage facility, cistern, and an atmospheric emission control system. DWR plans to abate hydrogen sulfide (H/sub 2/S) emissions through the use of the Stretford Process which scrubs the H/sub 2/S from the condenser vent gas stream and catalytically oxides the gas to elemental sulfur. If the Stretford Process does not meet emission limitations, a secondary H/sub 2/S abatement system using hydrogen peroxide/iron catalyst is proposed. The Bottle Rock project and other existing and future geothermal projects in the KGRA may result in cumulative impacts to soils, biological resources, water quality, geothermal steam resources, air quality, public health, land use, recreation, cultural resources, and aesthetics.

Not Available

1979-12-01T23:59:59.000Z

438

Sacramento Area Voltage Support Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E E R R A N E V A D A R E G I O N Sacramento Area Voltage Support DRAFT ENVIRONMENTAL IMPACT STATEMENT DRAFT ENVIRONMENTAL IMPACT STATEMENT DOE/EIS-0323 NOVEMBER 2002 COVER SHEET Title: Sacramento Area Voltage Support Draft Environmental Impact Statement (EIS) Lead Agency: Western Area Power Administration (Western) Location: Alameda, Contra Costa, Placer, Sacramento, San Joaquin, and Sutter Counties, State of California. EIS Number: DOE/EIS-0323 Contact: Ms. Loreen McMahon, Environmental Project Manager Western Area Power Administration Sierra Nevada Region 114 Parkshore Drive Folsom, CA 95630 (916) 353-4460 (916) 985-1936 fax email: mcmahon@wapa.gov Website: Information is also available on our website: www.wapa.gov Hotline: 1-877-913-4440 (toll-free) Abstract The Western Area Power Administration's Central Valley Project transmission system forms an integral part of

439

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 8, 2007 November 8, 2007 EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, Minnesota October 17, 2007 EIS-0402: Advance Notice of Intent to Prepare an Environmental Impact Statement Remediation of Area IV of the Santa Susana Field Laboratory August 10, 2007 EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO July 23, 2007 EIS-0375: Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste August 31, 2006 EIS-0380: Notice to Extend Comment Period on the Draft Site-Wide Environmental Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New

440

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 12, 2011 January 12, 2011 EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas January 4, 2011 EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada December 17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA December 17, 2010 EIS-0403: EPA Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States December 14, 2010 EIS-0459: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Hawai'i Interisland Renewable Energy Program December 10, 2010 EIS-0421: Draft Environmental Impact Statement

Note: This page contains sample records for the topic "draft environmental impact" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

442

EA-1606: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

606: Draft Environmental Assessment 606: Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

443

EA-1867: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1867: Draft Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE prepared this Draft EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's total $171.8 million funding for the proposed project would be provided from funds authorized in the American Recovery and Reinvestment Act of 2009 (Public Law 111-5, 123 Stat. 115). RTI's

444

Public Invited to Comment on Draft Environmental Assessment for Replacement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site September 1, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

445

Public Invited to Comment on Draft Environmental Assessment for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National Laboratory (INL) or Sandia National Laboratories (SNL). Transient testing involves placing fuel or material into the core of a nuclear reactor and subjecting it to short bursts of intense, high-power

446

NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)  

Energy.gov (U.S. Department of Energy (DOE))

The Council on Environmental Quality (CEQ), incollaboration with the California Governors Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

<