Sample records for double circuit upgrade

  1. Upgrading the ampacity of HPFF pipe-type cable circuits

    SciTech Connect (OSTI)

    Aabo, T.; Lawson, W.G. [Power Technologies, Inc., Schenectady, NY (United States)] [Power Technologies, Inc., Schenectady, NY (United States); Pancholi, S.V. [Potomac Electric Power Co., Washington, DC (United States)] [Potomac Electric Power Co., Washington, DC (United States)

    1995-01-01T23:59:59.000Z

    The upgrading of several 69 kV pipe-type cable feeders on the Potomac Electric Power Company (PEPCO) ion cable system is The methods used for the ampacity calculation are described. The fluid circulation approach required to meet the feeder emergency load requirements are For the feeders that were in service for approximately 40 years, a system life evaluation was performed.

  2. Upgrading the ampacity of HPFF pipe-type cable circuits

    SciTech Connect (OSTI)

    Aabo, T.; Lawson, W.G. [Power Technologies, Inc., Schenectady, NY (United States); Pancholi, S.V. [Potomac Electric Power Co., Washington, DC (United States)

    1994-12-31T23:59:59.000Z

    The upgrading of several 69 kV pipe-type cable feeders on the Potomac Electric Power Company (PEPCo) transmission cable system is discussed. The methods used for the ampacity calculation are described. The fluid circulation approach required to meet the feeder emergency load requirements are discussed. For the feeders that were in service for approximately 40 years, a system life evaluation was performed.

  3. Count-doubling time safety circuit

    DOE Patents [OSTI]

    Rusch, Gordon K. (Downers Grove, IL); Keefe, Donald J. (Lemont, IL); McDowell, William P. (Downers Grove, IL)

    1981-01-01T23:59:59.000Z

    There is provided a nuclear reactor count-factor-increase time monitoring circuit which includes a pulse-type neutron detector, and means for counting the number of detected pulses during specific time periods. Counts are compared and the comparison is utilized to develop a reactor scram signal, if necessary.

  4. Double sided circuit board and a method for its manufacture

    DOE Patents [OSTI]

    Lindenmeyer, C.W.

    1988-04-14T23:59:59.000Z

    Conductance between the sides of a large double sided printed circuit board is provided using a method which eliminates the need for chemical immersion or photographic exposure of the entire large board. A plurality of through-holes are drilled or punched in a substratum according to the desired pattern, conductive laminae are made to adhere to both sides of the substratum covering the holes and the laminae are pressed together and permanently joined within the holes, providing conductive paths. 4 figs.

  5. Average and recommended half-life values for two neutrino double beta decay: Upgrade-2013

    SciTech Connect (OSTI)

    Barabash, A. S. [Institute of Theoretical and Experimental Physics, B. Cheremushkinskaya 25, 117218 Moscow (Russian Federation)

    2013-12-30T23:59:59.000Z

    All existing positive results on two neutrino double beta decay in different nuclei were analyzed. Using the procedure recommended by the Particle Data Group, weighted average values for half-lives of {sup 48}Ca, {sup 76}Ge, {sup 82}Se, {sup 96}Zr, {sup 100}Mo, {sup 100}Mo?{sup 100}Ru (0{sub 1}{sup +}), {sup 116}Cd, {sup 130}Te, {sup 136}Xe, {sup 150}Nd, {sup 150}Nd?{sup 150}Sm (0{sub 1}{sup +}) and {sup 238}U were obtained. Existing geochemical data were analyzed and recommended values for half-lives of {sup 128}Te and {sup 130}Ba are proposed. I recommend the use of these results as the most currently reliable values for half-lives.

  6. Upgrade of CEBAF from 6 Gev To 12 Gev: Status

    SciTech Connect (OSTI)

    Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

    2013-04-19T23:59:59.000Z

    The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

  7. The Jefferson Lab 12 GeV Upgrade

    E-Print Network [OSTI]

    McKeown, R D

    2010-01-01T23:59:59.000Z

    Construction of the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is presently underway. This upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and the construction of upgraded detector hardware. An overview of this upgrade project is presented, along with highlights of the anticipated experimental program.

  8. The Jefferson Lab 12 GeV Upgrade

    E-Print Network [OSTI]

    R. D. McKeown

    2010-09-22T23:59:59.000Z

    Construction of the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is presently underway. This upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and the construction of upgraded detector hardware. An overview of this upgrade project is presented, along with highlights of the anticipated experimental program.

  9. A Technique for Low Power Dynamic Circuit Design in 32nm Double-Gate FinFET Technology

    E-Print Network [OSTI]

    Ayers, Joseph

    the leakage current (this is accomplished by connecting the back gate to the clock signal of the dynamic. By taking advantage of the independent double gate FinFET, Vth is controlled dynamically by biasing the back and drain of a device are connected to those of the other device. Drain Source Figure 1. FinFET structure

  10. Energy Efficiency Upgrades

    SciTech Connect (OSTI)

    Roby Williams

    2012-03-29T23:59:59.000Z

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

  11. Edison memory upgrade

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison memory upgraded during the maintenance in Jan 13-16, 2015 Edison memory upgraded during the maintenance in Jan 13-16, 2015 January 16, 2015 (0 Comments) Edison compute node...

  12. rig upgrades2.qxp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    mitted a significant portion of its budget to upgrade several items on its existing drilling rig at Naval Petroleum Reserve No. 3 (NPR-3). Many of the upgrades took place in...

  13. Upgrade of CEBAF from 6-GeV To 12-GeV: Status

    SciTech Connect (OSTI)

    Harwood, Leigh H.

    2013-04-01T23:59:59.000Z

    The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plants capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

  14. JEFFERSON LAB 12 GEV CEBAF UPGRADE

    SciTech Connect (OSTI)

    Rode, C. H. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia, 23606 (United States)

    2010-04-09T23:59:59.000Z

    The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

  15. Capturing Energy Upgrades

    Broader source: Energy.gov [DOE]

    Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

  16. The D0 Upgrade

    SciTech Connect (OSTI)

    Abachi, S.; D0 Collaboration

    1995-07-01T23:59:59.000Z

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  17. Upgrading through Preprocessing Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrading through Preprocessing Technologies The challenges of efficiently converting raw biomass into usable, affordable, customized bioenergy feedstdocks are many. The bioenergy...

  18. The 12 GeV Energy Upgrade at Jefferson Laboratory

    SciTech Connect (OSTI)

    Pilat, Fulvia C.

    2012-09-01T23:59:59.000Z

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  19. Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex

    SciTech Connect (OSTI)

    Kourbanis, ioanis

    2014-06-01T23:59:59.000Z

    After a 14 month shutdown accelerator modifications and upgrades are in place to allow us doubling of the Main Injector beam power. We will discuss the past MI high power operation and the current progress towards doubling the power.

  20. The Jefferson Lab 12 GeV Upgrade

    SciTech Connect (OSTI)

    R.D. McKeown

    2011-10-01T23:59:59.000Z

    A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

  1. Analysis Efforts Supporting NSTX Upgrades

    SciTech Connect (OSTI)

    H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

    2010-11-29T23:59:59.000Z

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  2. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  3. Cyclotron Institute Upgrade Project

    SciTech Connect (OSTI)

    Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

    2014-08-26T23:59:59.000Z

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  4. Advanced Photon Source Upgrade Project

    ScienceCinema (OSTI)

    Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

    2013-04-19T23:59:59.000Z

    Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

  5. SRS control system upgrade requirements

    SciTech Connect (OSTI)

    Hill, L.F.

    1998-08-04T23:59:59.000Z

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document.

  6. Tevatron detector upgrades

    SciTech Connect (OSTI)

    Lipton, R.; /Fermilab

    2005-01-01T23:59:59.000Z

    The D0 and CDF experiments are in the process of upgrading their detectors to cope with the high luminosities projected for the remainder of Tevatron Run II. They discuss the expected Tevatron environment through 2009, the detector challenges due to increasing luminosity in this period, and the solutions undertaken by the two experiments to mitigate detector problems and maximize physics results.

  7. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, E.T.; Lin, M.S.

    1999-01-12T23:59:59.000Z

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  8. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

    1999-01-12T23:59:59.000Z

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  9. ISIS upgrades David Findlay

    E-Print Network [OSTI]

    McDonald, Kirk

    ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation, 12­14 January 2012, FNAL #12;2 ISIS World for research in the physical and life sciences National and international community of >2000 scientists -- ISIS

  10. Jefferson Lab 12 GeV CEBAF Upgrade

    SciTech Connect (OSTI)

    Claus Rode

    2010-04-01T23:59:59.000Z

    The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ~6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

  11. HOM Survey of the First CEBAF Upgrade Style Cavity Pair

    SciTech Connect (OSTI)

    Marhauser, Frank; Davis, G; Drury, Michael; Grenoble, Christiana; Hogan, John; Manus, Robert; Preble, Joseph; Reece, Charles; Rimmer, Robert; Tian, Kai

    2009-05-01T23:59:59.000Z

    The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

  12. Upgraded Coal Interest Group

    SciTech Connect (OSTI)

    Evan Hughes

    2009-01-08T23:59:59.000Z

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  13. The Fermilab Linac Upgrade

    SciTech Connect (OSTI)

    Noble, R.J.

    1991-02-01T23:59:59.000Z

    The Fermilab Linac Upgrade is planned to increase the energy of the H- linac from 200 to 400 MeV. This is intended to reduce the incoherent space-charge tuneshift at injection into the 8 GeV Booster which can limit either the brightness or the total intensity of the beam. The Linac Upgrade will be achieved by replacing the last four 201.25 MHz drift-tube tanks which accelerate the beam from 116 to 200 MeV, with seven 805 MHz side-coupled cavity modules operating at an average axial field of abut 7.5 MV/m. This will allow acceleration to 400 MeV in the existing Linac enclosure. Each accelerator module will be driven with a klystron-based rf power supply. A prototype rf modulator has been built and tested at Fermilab, and a prototype 12 MW klystron is being fabricated by Litton Electron Devices. Fabrication of production accelerator modules is in progress. 8 figs., 4 tabs.

  14. Upgrading the Vanadium Redox Battery | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrading the Vanadium Redox Battery Upgrading the Vanadium Redox Battery New electrolyte mix increases energy storage by 70 percent After developing a more effective...

  15. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for...

    Office of Environmental Management (EM)

    "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production...

  16. Campus Utility Upgrades | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will provide essential support for the Argonne Leadership Computing Facility high performance computing upgrades, expected to occur in FY 2018. Campus utility upgrades also support...

  17. Tenneco upgrades natural gasoline

    SciTech Connect (OSTI)

    O'Gorman, E.K.

    1986-08-01T23:59:59.000Z

    Tenneco Oil Co. recently completed a natural gasoline upgrading project at its LaPorte, Tex., facility. The project was started in October 1985. The purpose was to fractionate natural gasoline and isomerize the n-pentane component. Three factors made this a particularly attractive project for the LaPorte complex: 1. The phase down of lead in gasoline made further processing of natural gasoline desirable. 2. Idle equipment and trained personnel were available at the plant as a result of a switch of Tenneco's natural gas liquids (NGL) fractionation to its Mont Belvieu, Tex., facility. 3. The plant interconnects with Houston's local markets. It has pipelines to Mont Belvieu, Texas City, and plants along the Houston Ship Channel, as well as truck, tank car, and barge-loading facilities. Here are the details on the operation of the facilities, the changes which were required to enable the plant to operate successfully, and how this conversion was completed in a timely fashion.

  18. Simulating Threshold Circuits by Majority Circuits \\Lambda

    E-Print Network [OSTI]

    Karpinski, Marek

    Simulating Threshold Circuits by Majority Circuits \\Lambda Mikael Goldmann y Numerical Analysis, and Kailath proved super­linear lower bounds on the number of wires in constant­depth majority circuits­size depth 2 majority circuit. In general we show that a polynomial­size, depth­ d threshold circuit can

  19. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01T23:59:59.000Z

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  20. Global Scratch Upgrade in Progress

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As...

  1. ISIS Project Upgrade Campus Community

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    ISIS Project Upgrade Campus Community Page Navigation Page | 1 Page navigation has changed in the ISIS Application. This document provides you with the new location of all your key Campus Community the Navigation Pagelets": ISIS.UML..EDU #12;

  2. MAST Upgrade - Construction Status

    E-Print Network [OSTI]

    Milnes, Joe; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O'Gorman, Tom; Scannell, Rory

    2015-01-01T23:59:59.000Z

    The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: 1) Testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); 2) Adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and 3) Exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progr...

  3. Energy Upgrade California Drives Demand From Behind the Wheel...

    Energy Savers [EERE]

    Upgrade California Drives Demand From Behind the Wheel Energy Upgrade California Drives Demand From Behind the Wheel Photo of a trailer with the Energy Upgrade California logo and...

  4. Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading...

    Office of Environmental Management (EM)

    Oil Upgrading Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading PNNL report-out at the CTAB webinar on Bio-Oil Upgrading. ctabwebinarbiooilsupgrading.pdf More...

  5. Clock Auto-synchronizing Method for BES III ETOF Upgrade

    E-Print Network [OSTI]

    Si-Yu, Wang; Shu-Bin, Liu; Qi, An

    2015-01-01T23:59:59.000Z

    An automatic clock synchronizing method implemented in field programmable gate array (FPGA) is proposed in this paper. It is developed for the clock system which will be applied in the end-cap time of flight (ETOF) upgrade of the Beijing Spectrometer (BESIII). In this design, an FPGA is used to automatically monitor the synchronization circuit and deal with signals coming from external clock synchronization circuit. By testing different delay time of the detection signal and analyzing state signals returned, the synchronization windows will be found automatically in FPGA. The new clock system not only retains low clock jitter which is less than 20ps root mean square (RMS), but also demonstrates automatic synchronization to the beam bunches. So far, the clock auto-synchronizing function has been working successfully under a series of tests. It will greatly simplify the system initialization and maintenance in the future.

  6. Clock Auto-synchronizing Method for BES III ETOF Upgrade

    E-Print Network [OSTI]

    Wang Si-Yu; Cao Ping; Liu Shu-Bin; An Qi

    2015-03-09T23:59:59.000Z

    An automatic clock synchronizing method implemented in field programmable gate array (FPGA) is proposed in this paper. It is developed for the clock system which will be applied in the end-cap time of flight (ETOF) upgrade of the Beijing Spectrometer (BESIII). In this design, an FPGA is used to automatically monitor the synchronization circuit and deal with signals coming from external clock synchronization circuit. By testing different delay time of the detection signal and analyzing state signals returned, the synchronization windows will be found automatically in FPGA. The new clock system not only retains low clock jitter which is less than 20ps root mean square (RMS), but also demonstrates automatic synchronization to the beam bunches. So far, the clock auto-synchronizing function has been working successfully under a series of tests. It will greatly simplify the system initialization and maintenance in the future.

  7. Dual-circuit, multiple-effect refrigeration system and method

    DOE Patents [OSTI]

    DeVault, Robert C. (Knoxville, TN)

    1995-01-01T23:59:59.000Z

    A dual circuit absorption refrigeration system comprising a high temperature single-effect refrigeration loop and a lower temperature double-effect refrigeration loop separate from one another and provided with a double-condenser coupling therebetween. The high temperature condenser of the single-effect refrigeration loop is double coupled to both of the generators in the double-effect refrigeration loop to improve internal heat recovery and a heat and mass transfer additive such as 2-ethyl-1-hexanol is used in the lower temperature double-effect refrigeration loop to improve the performance of the absorber in the double-effect refrigeration loop.

  8. EFITviewer UpgradesEFITviewer Upgrades MDSplus Event Management System

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Summation System. red values indicate an alarm condition. #12;Web Tool Upgrades · Different Signals may is automatic · Signal names saved in a file may be pasted into Web Tool fields · "Memory" of previous entries improved #12;#12;#12;Web Tools can overlay profiles #12;

  9. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential...

  10. Commutation circuit for an HVDC circuit breaker

    DOE Patents [OSTI]

    Premerlani, William J. (Scotia, NY)

    1981-01-01T23:59:59.000Z

    A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components.

  11. Commutation circuit for an HVDC circuit breaker

    DOE Patents [OSTI]

    Premerlani, W.J.

    1981-11-10T23:59:59.000Z

    A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components. 13 figs.

  12. Optical Link ASICs for the LHC Upgrade

    E-Print Network [OSTI]

    K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

    2009-11-23T23:59:59.000Z

    We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

  13. MIPP Plastic Ball electronics upgrade

    SciTech Connect (OSTI)

    Baldin, Boris; /Fermilab

    2009-01-01T23:59:59.000Z

    An upgrade electronics design for Plastic Ball detector is described. The Plastic Ball detector was a part of several experiments in the past and its back portion (proposed to be used in MIPP) consists of 340 photomultipliers equipped with a sandwich scintillator. The scintillator sandwich has fast and slow signal component with decay times 10 ns and 1 {micro}s respectively. The upgraded MIPP experiment will collect up to 12,000 events during each 4 second spill and read them out in {approx}50 seconds between spills. The MIPP data acquisition system will employ deadtime-less concept successfully implemented in Muon Electronics of Dzero experiment at Fermilab. An 8-channel prototype design of the Plastic Ball Front End (PBFE) implementing these requirements is discussed. Details of the schematic design, simulation and prototype test results are discussed.

  14. Canada's heavy oil, bitumen upgrading activity is growing

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26T23:59:59.000Z

    Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

  15. Upgrade Boilers with Energy-Efficient Burners

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  16. Jefferson Lab accelerator upgrade completed: Initial operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE to begin initial operations of the Continuous Electron Beam Accelerator Facility (CEBAF) as part of its ongoing 338 million upgrade. With the approval of Critical...

  17. Electronic Circuit Realization of the Logistic Map

    E-Print Network [OSTI]

    Madhekar Suneel

    2006-03-11T23:59:59.000Z

    An electronic circuit realization of the logistic difference equation is presented using analog electronics. The behavior of the realized system is evaluated against computer simulations of the same. The circuit is found to exhibit the entire range of dynamics of the logistic equation: fixed points, periodicity, period doubling, chaos and intermittency. Quantitative measurements of the dynamics of the realized system are presented and are found to be in good agreement with the theoretical values. Some possible applications of such a realization are briefly discussed.

  18. The Upgraded D0 detector

    SciTech Connect (OSTI)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U./Simon Fraser U. /York U., Canada /McGill U. /Beijing, Inst. High Energy Phys. /Hefei, CUST /Andes U., Bogota /Charles U. /Prague, Tech. U. /Prague, Inst. Phys. /San Francisco deQuito U. /Clermont-Ferrand U. /LPSC, Grenoble /Marseille, CPPM /Orsay, LAL /Paris U., VI-VII /DAPNIA, Saclay /Strasbourg, IReS; ,

    2005-07-01T23:59:59.000Z

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  19. Digital upgrade issues and the evolving regulatory environment

    SciTech Connect (OSTI)

    Meininger, R. D. [CHAR Services, Inc., 400 E. Main St., Annville, PA 17003 (United States)

    2006-07-01T23:59:59.000Z

    This paper deals with the qualification of an Instrumentation and Control (I and C) upgrade for Electromagnetic Compatibility (EMC) in the plant, focusing on the interpretation of the NRC Regulatory Guide 1.180 Revision 1, 'Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems.' Options presented by Reg. Guide 1.180 are discussed along with alternative EMC Guidelines being used by nuclear power plants. Problems commonly encountered during the EMC qualification process are discussed and suggestions presented on how to deal with these common problems. Also included is a discussion of an emerging issue of how to address the issue of EMC of replacement discrete modules or printer circuit (PC) boards in a system that was either previously qualified or never qualified for EMC. (authors)

  20. Potential Peak Load Reductions From Residential Energy Efficient Upgrades

    E-Print Network [OSTI]

    Meisegeier, D.; Howes, M.; King, D.; Hall, J.

    2002-01-01T23:59:59.000Z

    the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades...

  1. Charge regulation circuit

    DOE Patents [OSTI]

    Ball, Don G. (Livermore, CA)

    1992-01-01T23:59:59.000Z

    A charge regulation circuit provides regulation of an unregulated voltage supply in the range of 0.01%. The charge regulation circuit is utilized in a preferred embodiment in providing regulated voltage for controlling the operation of a laser.

  2. SND data acquisition system upgrade

    E-Print Network [OSTI]

    A. G. Bogdanchikov; V. P. Druzhinin; A. A. Korol; S. V. Koshuba; A. I. Tekutiev; Yu. V. Usov

    2014-04-02T23:59:59.000Z

    The data acquisition (DAQ) system of the SND detector successfully operated during four data-taking seasons (2010-2013) at the e+e- collider VEPP-2000. Currently the collider is shut down for planned reconstruction, which is expected to increase the VEPP-2000 luminosity and data flow from the SND detector electronics by up to 10 times. Since current DAQ system implementation (electronics and computer part) does not have enough reserve for selection of events in the new environment without compromising quality, there arose the need for the system upgrade. Here we report on the major SND data acquisition system upgrade which includes developing new electronics for digitization and data transfer, complete redesign of the data network, increasing of the DAQ computer farm processing capacity and making the event building process concurrent. These measures will allow us to collect data flow from the most congested detector subsystems in parallel in contrast to the current situation. We would like to discuss also the possibility to implement full software trigger solution in the future.

  3. NSTXpool Computer Upgrade December 9, 2010

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

  4. Project W-420 stack monitoring system upgrades

    SciTech Connect (OSTI)

    CARPENTER, K.E.

    1999-02-25T23:59:59.000Z

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  5. JET neutral beam power upgrade Introduction

    E-Print Network [OSTI]

    JET neutral beam power upgrade Introduction A tokamak is a complex assembly, a system of systems the challenging requirements that fusion demands. The neutral beam heating system and its upgrade for the JET systems) are the main plasma heating scheme on fusion devices such as JET and ITER. The JET neutral beam

  6. Piezoelectric drive circuit

    DOE Patents [OSTI]

    Treu, C.A. Jr.

    1999-08-31T23:59:59.000Z

    A piezoelectric motor drive circuit is provided which utilizes the piezoelectric elements as oscillators and a Meacham half-bridge approach to develop feedback from the motor ground circuit to produce a signal to drive amplifiers to power the motor. The circuit automatically compensates for shifts in harmonic frequency of the piezoelectric elements due to pressure and temperature changes. 7 figs.

  7. Piezoelectric drive circuit

    DOE Patents [OSTI]

    Treu, Jr., Charles A. (Raymore, MO)

    1999-08-31T23:59:59.000Z

    A piezoelectric motor drive circuit is provided which utilizes the piezoelectric elements as oscillators and a Meacham half-bridge approach to develop feedback from the motor ground circuit to produce a signal to drive amplifiers to power the motor. The circuit automatically compensates for shifts in harmonic frequency of the piezoelectric elements due to pressure and temperature changes.

  8. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  9. ENERGY STAR Webinar: Financing Energy Efficient Upgrades with...

    Broader source: Energy.gov (indexed) [DOE]

    ENERGY STAR Webinar: Financing Energy Efficient Upgrades with ENERGY STAR ENERGY STAR Webinar: Financing Energy Efficient Upgrades with ENERGY STAR October 21, 2014 2:00PM to...

  10. EECBG Success Story: Energy Efficiency Upgrades Part of Winning...

    Office of Environmental Management (EM)

    Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District...

  11. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...

    Energy Savers [EERE]

    Residential energy upgrade projects typically included: insulation; air and duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water...

  12. EIS-0484: Montana-to-Washington Transmission System Upgrade Project...

    Energy Savers [EERE]

    4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington,...

  13. Sandia National Laboratories: Solar Test Facility Upgrades Complete...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support Power Industry Solar Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to...

  14. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Energy Savers [EERE]

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

  15. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    SciTech Connect (OSTI)

    RODRIGUEZ,C.GOLOSKOKOV,I.FISHBONE,L.GOODEY,K.LOOMIS,M.CRAIN,B.JR.LARSEN,R.

    2003-07-18T23:59:59.000Z

    The success of reducing the risk of nuclear proliferation through physical protection and material control/accounting systems depends upon the development of an effective design that includes consideration of the objectives of the systems and the resources available to implement the design. Included among the objectives of the design are facility characterization, definition of threat, and identification of targets. When considering resources, the designer must consider funds available, rapid low-cost elements, technology elements, human resources, and the availability of resources to sustain operation of the end system. The Siberian Chemical Combine (SCC) is a multi-function nuclear facility located in the Tomsk region of Siberia, Russia. Beginning in 1996, SCC joined with the United States Department of Energy (US/DOE) Material Protection, Control, and Accounting (MPC&A) Program to develop and implement MPC&A upgrades for the Radiochemical, Chemical Metallurgical, Conversion, Uranium Enrichment, and Reactor Plants of the SCC. At the Radiochemical Plant the MPC&A design and implementation process has been largely completed for the Plutonium Storage Facility and related areas of the Radiochemical Plant. Design and implementation of upgrades for the Radiochemical Plant include rapid physical protection upgrades such as bricking up of doors and windows, and installation of security-hardened doors. Rapid material control and accounting upgrades include installation of modern balances and bar code equipment. Comprehensive MPC&A upgrades include the installation of access controls to sensitive areas of the Plant, alarm communication and display (AC&D) systems to detect and annunciate alarm conditions, closed circuit (CCTV) systems to assess alarm conditions, central and secondary alarm station upgrades that enable security forces to assess and respond to alarm conditions, material control and accounting upgrades that include upgraded physical inventory procedures, and destructive and nondestructive assay equipment to perform neutron and gamma measurements on nuclear materials in process or storage. These MPC&A upgrades have been in operation at the SCC Radiochemical Plant for between 2 and 3 years. The operational experience gained by SCC during this period is currently being evaluated by SCC and ''lessons learned'' will be considered both for continued operation of the Radiochemical Plant MPC&A systems and similar MPC&A systems that are currently being planned for other Plant Sites of the SCC.

  16. EA-1905: Double Eagle Water System, Carlsbad, New Mexico

    Broader source: Energy.gov [DOE]

    This EA, prepared by the U.S. Department of the Interior’s Bureau of Land Management Carlsbad Field Office and adopted by DOE, evaluates the expansion and upgrade of the City of Carlsbad’s Double Eagle Water System.

  17. ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

    E-Print Network [OSTI]

    A. S. Cerqueira

    2013-05-03T23:59:59.000Z

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The ATLAS upgrade program is divided in three phases: The Phase~0 occurs during 2013-2014, Phase~1 during 2018-1019 and finally Phase~2, which is foreseen for 2022-2023, whereafter the peak luminosity will reach 5-7 x 10$^{34}$ cm$^2$s$^{-1}$ (HL-LHC). The main TileCal upgrade is focused on the Phase~2 period. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. All new electronics must be able to cope with the increased radiation levels. An ambitious upgrade development program is pursued to study different electronics options. Three options are presently being investigated for the front-end electronic upgrade. The first option is an improved version of the present system built using commercial components, the second alternative is based on the development of a dedicated ASIC (Application Specific Integrated Circuit) and the third is the development of a new version of the QIE (Charge Integrator and Encoder) based on the one developed for Fermilab. All three options will use the same readout and control system using high speed (up to 40 Gb/s) links for communication and clock synchronization. For the off-detector electronics a new back-end architecture is being developed. A demonstrator prototype read-out for a slice of the calorimeter with most of the new electronics, but still compatible with the present system, is planned to be inserted in ATLAS already in mid 2014 (at the end of the Phase~0 upgrade).

  18. Beam intensity upgrade at Fermilab

    SciTech Connect (OSTI)

    Marchionni, A.; /Fermilab

    2006-07-01T23:59:59.000Z

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  19. Energy Efficiency Through Lighting Upgrades

    SciTech Connect (OSTI)

    Kara Berst; Maria Howeth

    2010-06-01T23:59:59.000Z

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  20. 12 GeV Upgrade Project - Cryomodule Production

    SciTech Connect (OSTI)

    J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

    2012-07-01T23:59:59.000Z

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

  1. Operation of the Upgraded ATLAS Level-1 Central Trigger System

    E-Print Network [OSTI]

    Glatzer, Julian Maximilian Volker; The ATLAS collaboration

    2015-01-01T23:59:59.000Z

    The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different sub-detector combinations. In this contribution, we give an overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are m...

  2. LHCb PID Upgrade Technical Design Report

    E-Print Network [OSTI]

    LHCb Collaboration

    2013-01-01T23:59:59.000Z

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  3. Commissioning Results of the Upgraded Neutralized Drift Compression Experiment

    E-Print Network [OSTI]

    Lidia, S.M.

    2009-01-01T23:59:59.000Z

    COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

  4. Nb3Sn Quadrupoles Designs For The LHC Upgrades

    E-Print Network [OSTI]

    Felice, Helene

    2010-01-01T23:59:59.000Z

    progress in order to incorporate all the accelerator quality features required for a LHC upgrade (cooling

  5. EC5135: Analog Electronic Circuits EC3102: Analog Circuits

    E-Print Network [OSTI]

    Krishnapura, Nagendra

    #12;Course prerequisites Circuit analysis Mesh, nodal analyses RLC, linear dependent sources Laplace and Kemmerly, Engineering Circuit Analysis, McGraw Hill, 6/e. B. P. Lathi, Linear Systems and Signals, Oxford Circuits EC3102: Analog Circuits #12;Course contents Nonlinear circuits-incremental analysis Obtaining

  6. Advanced Photon Source Upgrade Project - Energy

    ScienceCinema (OSTI)

    Gibson, Murray; Chamberlain, Jeff; Young, Linda

    2013-04-19T23:59:59.000Z

    An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

  7. Economic Options for Upgrading Waste Heat 

    E-Print Network [OSTI]

    Erickson, D. C.

    1983-01-01T23:59:59.000Z

    There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat...

  8. Economic Options for Upgrading Waste Heat

    E-Print Network [OSTI]

    Erickson, D. C.

    1983-01-01T23:59:59.000Z

    There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat...

  9. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul; 740, 293 Highway; Baden, NC 28009

    2013-02-28T23:59:59.000Z

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  10. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema (OSTI)

    Gibbson, Murray;

    2013-04-19T23:59:59.000Z

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  11. ATLAS upgrade June09_v3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the upgrade will replace the front end of the ATLAS Positive Ion Injector linac (PII) by a new bunching system, a Radio-Frequency Quadrupole (RFQ) and a new cryostat of...

  12. Upgrade Your Refinery for Energy Conservation

    E-Print Network [OSTI]

    Johnnie, D. H., Jr.; Klooster, H. J.

    1983-01-01T23:59:59.000Z

    Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test...

  13. Regenerative feedback resonant circuit

    DOE Patents [OSTI]

    Jones, A. Mark; Kelly, James F.; McCloy, John S.; McMakin, Douglas L.

    2014-09-02T23:59:59.000Z

    A regenerative feedback resonant circuit for measuring a transient response in a loop is disclosed. The circuit includes an amplifier for generating a signal in the loop. The circuit further includes a resonator having a resonant cavity and a material located within the cavity. The signal sent into the resonator produces a resonant frequency. A variation of the resonant frequency due to perturbations in electromagnetic properties of the material is measured.

  14. Remote reset circuit

    DOE Patents [OSTI]

    Gritzo, Russell E. (West Melbourne, FL)

    1987-01-01T23:59:59.000Z

    A remote reset circuit acts as a stand-alone monitor and controller by clocking in each character sent by a terminal to a computer and comparing it to a given reference character. When a match occurs, the remote reset circuit activates the system's hardware reset line. The remote reset circuit is hardware based centered around monostable multivibrators and is unaffected by system crashes, partial serial transmissions, or power supply transients.

  15. Canted Undulator Upgrade for GeoSoilEnviroCARS Sector 13 at the Advanced Photon Source

    SciTech Connect (OSTI)

    Sutton, Stephen

    2013-02-02T23:59:59.000Z

    Support for the beamline component of the canted undulator upgrade of Sector 13 (GeoSoilEnviroCARS; managed and operated by the University of Chicago) at the Advanced Photon Source (APS; Argonne National Laboratory) was received from three agencies (equally divided): NASA-SRLIDAP (now LARS), NSF-EAR-IF (ARRA) and DOE-Single Investigator Small Group (SISGR). The associated accelerator components (undulators, canted front end) were provided by the APS using DOE-ARRA funding. The intellectual merit of the research enabled by the upgrade lies in advancing our knowledge of the composition, structure and properties of earth materials; the processes they control; and the processes that produce them. The upgrade will facilitate scientific advances in the following areas: high pressure mineral physics and chemistry, non-crystalline and nano-crystalline materials at high pressure, chemistry of hydrothermal fluids, reactions at mineral-water interfaces, biogeochemistry, oxidation states of magmas, flow dynamics of fluids and solids, and cosmochemistry. The upgrade, allowing the microprobe to operate 100% of the time and the high pressure and surface scattering and spectroscopy instruments to receive beam time increases, will facilitate much more efficient use of the substantial investment in these instruments. The broad scientific community will benefit by the increase in the number of scientists who conduct cutting-edge research at GSECARS. The user program in stations 13ID-C (interface scattering) and 13ID-D (laser heated diamond anvil cell and large volume press) recommenced in June 2012. The operation of the 13ID-E microprobe station began in the Fall 2012 cycle (Oct.-Dec 2012). The upgraded canted beamlines double the amount of undulator beam time at Sector 13 and provide new capabilities including extended operations of the X-ray microprobe down to the sulfur K edge and enhanced brightness at high energy. The availability of the upgraded beamlines will advance the research being conducted at Sector 13.

  16. D0 Silicon Upgrade: Upgrade Piping Loads on Cleanroom Roof

    SciTech Connect (OSTI)

    Sakla, Steve; /Fermilab

    1995-08-28T23:59:59.000Z

    The proposed piping layout for the DO upgrade will run along the south wall of DAB. The cryogenic service pipe runs above the upper and lower cleanroom roofs and will need to be supported by the roofs beams. Calculations were done to determine the stresses in the I-beams created by the existing and additional loads due to the upgrade. Refer to drawing no. 3823.115-ME-317283 for drawings of the piping layout. Figure 1 shows the 'plan view' portion of this drawing. The weight of the individual lines were calculated in figure 2 assuming a pipe density of O.28 lbm/in{sup 3} for stainless steel (0.12% C) and a fluid density (assuming LN2 at 1 atm) of 0.03 lbm/in{sup 3}. The weights of the corrugated steel flooring, assembly hall feed cans, support beams, and roof hatch were also included in the analysis. These loads are calculated on pgs. 5-6. A floor load of 50 lbf/ft{sup 2} was also added in order to maintain the existing floor load limit in addition to the added piping loads. Measurements of the dimensions of the I-beams determined that the nominal sizes of the beams were W8 x 21 for the lower roof and W14 x 26 for the upper roof. Pipe lengths were determined from the drawing for each of the lines on pgs. 1-2 of the calculations (refer to all piping by line numbers according to figure 2). A total weight was calculated for lines 3-9 along the south wall and lines 1-2 running along the north wall of the lower cleanroom roof. To simplify the calculations these weights were assumed to be evenly distributed on the 5 I-beam supports of the lower cleanroom roof 2.5 feet in from the south wall. The stress analysis was done using FrameMac, a 2-D finite element program for the Macintosh. Beam 3 was not included in the analysis because it is structurally equivalent to beam 1. The program outputted maximum values for shear stress, bending stress, shear force, and moments in each of the beams analyzed. These values were then compared to the allowable stresses as per the specifications and codes stated in the AISC: Manual of Steel Construction. The stresses on the roof beams needed to be determined in a number of different places. The first was in the beam itself which included the flange and web sections. The second place was at the ends of the beams where the flanges were removed to make the perpendicular connections to the other beams on the lower roof. The final point was the framed beam connection which included the bolt analysis. FrameMac calculated stresses only for the beams which included the sections where the flanges were removed to make the end connections. To analyze the connections, the allowable bending and shear stresses were solved for allowable shear and moments. This was done because FrameMac does not have the capability to analyze the dimensions for the bolts and angles used in the connections were known and the program outputted values for reaction forces and moments at the ends of the beams. Multiplying the allowable shear stress for the bolts and angle connections by their respective areas gave the allowable shear force. The allowable moment for the angle connection was calculated by multiplying the section modulus of the angle by the allowable bending stress. These allowable loads are calculated on pgs. 7-8. The allowable and maximum calculated stresses by FrameMac are summarized in a table. In conclusion, the cleanroom roofs will be able to safely support the weight of the upgrade cryogenic piping, feed cans, corrugated flooring and a 50 lbf/ft{sup 2} floor load with the addition of diagonal braces at the ends of beams 1,2,3,4, and 8. The location and size of these diagonal braces are shown in fig. 4. Also, the piping supports and feed cans will all need to be placed directly above the I-beam supports. These supports will consist of unistrut structures that will be detailed and specified separate to this analysis. The output and input data from FrameMac and the drawings used in the analysis follow the calculation pages.

  17. Circuit Theory for Analysis and Design of Spintronic Integrated Circuits

    E-Print Network [OSTI]

    Manipatruni, Sasikanth; Young, Ian A

    2011-01-01T23:59:59.000Z

    We present a theoretical and a numerical formalism for analysis and design of spintronic integrated circuits (SPINICs). The proposed formalism encompasses a generalized circuit theory for spintronic integrated circuits based on nanomagnetic dynamics and spin transport. We derive the circuit models for vector spin conduction in non-magnetic and magnetic components. We then propose an extension to the modified nodal analysis for the analysis of spin circuits. We demonstrate the applicability of the proposed theory using an example spin logic circuit.

  18. Compensated gain control circuit for buck regulator command charge circuit

    DOE Patents [OSTI]

    Barrett, David M. (Albuquerque, NM)

    1996-01-01T23:59:59.000Z

    A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit.

  19. Compensated gain control circuit for buck regulator command charge circuit

    DOE Patents [OSTI]

    Barrett, D.M.

    1996-11-05T23:59:59.000Z

    A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit. 5 figs.

  20. AC Circuits Magnetic flux

    E-Print Network [OSTI]

    Bertulani, Carlos A. - Department of Physics and Astronomy, Texas A&M University

    , i = 0 At t=, i =/R #12;Charging and discharging RL circuit Now move switch to position b so battery, B, in its central region Inductance, L is defined as Inductance per unit length of a solenoid in a circuit A changing current in a coil generates a self-induced emf, L in the coil Process is called self-induction

  1. Liquid detection circuit

    DOE Patents [OSTI]

    Regan, Thomas O. (North Aurora, IL)

    1987-01-01T23:59:59.000Z

    Herein is a circuit which is capable of detecting the presence of liquids, especially cryogenic liquids, and whose sensor will not overheat in a vacuum. The circuit parameters, however, can be adjusted to work with any liquid over a wide range of temperatures.

  2. Quantum Circuits Architecture

    E-Print Network [OSTI]

    Giulio Chiribella; Giacomo Mauro D'Ariano; Paolo Perinotti

    2007-12-09T23:59:59.000Z

    We present a method for optimizing quantum circuits architecture. The method is based on the notion of "quantum comb", which describes a circuit board in which one can insert variable subcircuits. The method allows one to efficiently address novel kinds of quantum information processing tasks, such as storing-retrieving, and cloning of channels.

  3. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  4. Climate balance of biogas upgrading systems

    SciTech Connect (OSTI)

    Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

    2010-01-15T23:59:59.000Z

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

  5. Sensor readout detector circuit

    DOE Patents [OSTI]

    Chu, D.D.; Thelen, D.C. Jr.

    1998-08-11T23:59:59.000Z

    A sensor readout detector circuit is disclosed that is capable of detecting sensor signals down to a few nanoamperes or less in a high (microampere) background noise level. The circuit operates at a very low standby power level and is triggerable by a sensor event signal that is above a predetermined threshold level. A plurality of sensor readout detector circuits can be formed on a substrate as an integrated circuit (IC). These circuits can operate to process data from an array of sensors in parallel, with only data from active sensors being processed for digitization and analysis. This allows the IC to operate at a low power level with a high data throughput for the active sensors. The circuit may be used with many different types of sensors, including photodetectors, capacitance sensors, chemically-sensitive sensors or combinations thereof to provide a capability for recording transient events or for recording data for a predetermined period of time following an event trigger. The sensor readout detector circuit has applications for portable or satellite-based sensor systems. 6 figs.

  6. Nonlinear Circuit Analysis An Introduction 1. Why nonlinear circuits?

    E-Print Network [OSTI]

    Hart, Gus

    Nonlinear Circuit Analysis ­ An Introduction 1. Why nonlinear circuits? Electrical devices: the oscillator. 2. What is a nonlinear circuit? It is easy to understand the difference between a linear and a nonlinear circuit by looking at the difference between a linear and a nonlinear equation: y x ¡ 2 (1) y

  7. Electron cyclotron emission radiometer upgrade on the Joint European Torus (JET) tokamak

    SciTech Connect (OSTI)

    Luna, E. de la; Sanchez, J.; Tribaldos, V.; Conway, G.; Suttrop, W.; Fessey, J.; Prentice, R.; Gowers, C.; Chareau, J. M. [Asociacion EURATOM-CIEMAT para Fusion, CIEMAT, Madrid (Spain); IPP-EURATOM Association, Garching (Germany); EURATOM-UKAEA Fusion Associations, Culham Science Centre, Abingdon (United Kingdom); European Commission, Institute for Transuranium Elements, Karlsruhe (Germany)

    2004-10-01T23:59:59.000Z

    The capabilities of the Joint European Torus (JET) electron cyclotron emission (ECE) diagnostics have recently been extended with an upgrading of the heterodyne radiometer. The number of channels has been doubled to 96 channels, with a frequency separation corresponding to <1 cm for JET magnetic field gradient, and with a frequency response of 1 MHz. This enhancement has increased the radial coverage of the ECE electron temperature measurements in JET to approximately the full plasma column (limited at R>2.6 m for the X-mode due to harmonic overlap) at almost all magnetic field values used at JET (1.7 Tupgraded radiometer is presented along with some results showing its performance.

  8. MAVIS III -- A Windows 95/NT Upgrade

    SciTech Connect (OSTI)

    Hardwick, M.F. [Sandia National Labs., Livermore, CA (United States). GTS Engineering Dept.

    1997-12-01T23:59:59.000Z

    MAVIS (Modeling and Analysis of Explosive Valve Interactions) is a computer program that simulates operation of explosively actuated valve. MAVIS was originally written in Fortran in the mid 1970`s and was primarily run on the Sandia Vax computers in use through the early 1990`s. During the mid to late 1980`s MAVIS was upgraded to include the effects of plastic deformation and it became MAVIS II. When the Vax computers were retired, the Gas Transfer System (GTS) Development Department ported the code to the Macintosh and PC platforms, where it ran as a simple console application. All graphical output was lost during these ports. GTS code developers recently completed an upgrade that provides a Windows 95/NT MAVIS application and restores all of the original graphical output. This upgrade is called MAVIS III version 1.0. This report serves both as a user`s manual for MAVIS III v 1.0 and as a general software development reference.

  9. Bitumen and heavy oil upgrading in Canada

    SciTech Connect (OSTI)

    Chrones, J.

    1988-06-01T23:59:59.000Z

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulfur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader, now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional products, also based on hydrogenation, will use ebullated bed catalyst systems: the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

  10. Bitumen and heavy oil upgrading in Canada

    SciTech Connect (OSTI)

    Chrones, J. (Chrones Engineering Consultants Inc., 111 Lord Seaton Road, Willowdale, Ontario (CA)); Germain, R.R. (Alberta Oil Sands Technology and Research Authority, Edmonton, AB (Canada))

    1989-01-01T23:59:59.000Z

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulphur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional projects, also based on hydrogenation, will use ebullated bed catalyst systems; the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

  11. Upgrading : an alternative approach towards housing reform in China

    E-Print Network [OSTI]

    He, Fang, 1956-

    1989-01-01T23:59:59.000Z

    The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

  12. Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...

    Energy Savers [EERE]

    Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade November 8, 2013 - 12:00am Addthis Utilizing 67,000 of EERE's...

  13. Jefferson Lab's upgraded Free-Electron Laser produces first ligh...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Navy's goals and expectations and we expect no less from the upgraded FEL." The Free-Electron Laser upgrade project is funded by the Department of Defense's Office of...

  14. Unique Solar Thermal Laboratory Gets an Upgrade | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This power tower is part of the...

  15. Automatic Software Upgrades for Distributed Systems (PhD thesis)

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06T23:59:59.000Z

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  16. Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation 

    E-Print Network [OSTI]

    Yang, Daegil

    2011-02-22T23:59:59.000Z

    hydrocarbons. Second, we studied the energy transfer mechanism of E-Beam upgrading to optimize the process. Third, we conducted a preliminary economic analysis based on energy consumption and compared the economics of E-Beam upgrading with conventional...

  17. Superconducting flux flow digital circuits

    DOE Patents [OSTI]

    Hietala, V.M.; Martens, J.S.; Zipperian, T.E.

    1995-02-14T23:59:59.000Z

    A NOR/inverter logic gate circuit and a flip flop circuit implemented with superconducting flux flow transistors (SFFTs) are disclosed. Both circuits comprise two SFFTs with feedback lines. They have extremely low power dissipation, very high switching speeds, and the ability to interface between Josephson junction superconductor circuits and conventional microelectronics. 8 figs.

  18. Advanced Photon Source Upgrade —Creating a Better Quality of Life

    SciTech Connect (OSTI)

    Linda Young

    2012-11-05T23:59:59.000Z

    The upgrade will enable ultrafast X-ray pulses that could point the way to more efficient electronics and vehicles.

  19. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Siddiqui, Afzal

    2008-01-01T23:59:59.000Z

    utility tari?s, the electricity price may be revised only Investment and Upgrade in Distributed Generation

  20. The JLAB 12 GeV Energy Upgrade of CEBAF

    SciTech Connect (OSTI)

    Harwood, Leigh H. [JLAB

    2013-12-01T23:59:59.000Z

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  1. Optimal tunneling enhances the quantum photovoltaic effect in double quantum dots

    E-Print Network [OSTI]

    Wang, Chen

    We investigate the quantum photovoltaic effect in double quantum dots by applying the nonequilibrium quantum master equation. A drastic suppression of the photovoltaic current is observed near the open circuit voltage, ...

  2. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01T23:59:59.000Z

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  3. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 888 03MAY10A 03: Period of Performance: $949 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Budget: Labik Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary sheet

  4. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 500 01OCT12 01: Period of Performance: $1,174 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work 2014 Authorized Budget: Perry Functional Manager L. Dudek Approvals Signature Date NSTX-U Project

  5. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $251 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Titus

  6. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $4,516 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Denault

  7. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,401 23FEB09A: Period of Performance: $2,984 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Account Manager Stevenson Functional Manager M.Williams Approvals Signature Date NSTX-U Project Manager R

  8. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $102 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Blanchard

  9. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Cost n n % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project: Period of Performance: $442 Control Account Manager: Revision #: Revision Date: CLOSED Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Chrzanowski

  10. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,401 23FEB09A: Period of Performance: $3,335 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Raki

  11. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,240 23FEB09A: Period of Performance: $2,260 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Denault

  12. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1,366 23FEB09A: Period of Performance: $1,860 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Denault

  13. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    % PPCTe B Earned value cost (BCWP) m Bg o %CPlanned value cost (BCWS) NSTX Upgrade Project Subtotal 1: Period of Performance: $3,618 Control Account Manager: Revision #: Revision Date: July-11 Authorized Work Description: Attachments: ECP# Implement Date Prior Budget New Budget Name Control Account Manager Perry

  14. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01T23:59:59.000Z

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  15. UPGRADES TO Monteburns, VERSION 3.0

    SciTech Connect (OSTI)

    Galloway, Jack D [Los Alamos National Laboratory; Trellue, Holly R [Los Alamos National Laboratory

    2012-06-22T23:59:59.000Z

    Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

  16. T-Farm complex alarm upgrades

    SciTech Connect (OSTI)

    Roberts, J.B.

    1995-01-01T23:59:59.000Z

    The alarm and controls associated with the T, TX, and TY farms are located in the 242-T control room. The design data for replacement and upgrades of the alarm panels is in this document. This task was canceled previous to the 90% design review point.

  17. Testing of FMI's Coal Upgrading Process

    SciTech Connect (OSTI)

    Vijay Sethi

    2009-03-21T23:59:59.000Z

    WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

  18. Malcolm, N. and Aggarwal, R.k. (2014) An Analysis of Reducing Back Flashover Faults with Surge Arresters on 69/138 kV Double

    E-Print Network [OSTI]

    McCusker, Guy

    Arresters on 69/138 kV Double Circuit Transmission Lines Due to Direct Lightning Strikes on the Shield Wires-EMTP, Back flashover faults, Lightning strokes, Surge arrester, Transmission lines. Abstract Back flashover causes of power interruptions on the double-circuit 69/138 kV overhead transmission lines in Jamaica

  19. Sustainability Double Degree Double Degree Info

    E-Print Network [OSTI]

    Grünwald, Niklaus J.

    Sustainability Double Degree Double Degree Info: · 36 credits in B for graduation. Sustainability Core: Take each course below for a total of 17 -20 credits. Term/Grade Course _____ ____ *NR 350 (4) Sustainable

  20. Push-pull radio frequency circuit with integral transistion to waveguide output

    DOE Patents [OSTI]

    Bennett, Wilfred P. (21 Catskill Ct., Belle Mead, NJ 08502)

    1987-01-01T23:59:59.000Z

    A radio frequency circuit for ICRF heating includes a resonant push-pull circuit, a double ridged rectangular waveguide, and a coupling transition which joins the waveguide to the resonant circuit. The resonant circuit includes two cylindrical conductors mounted side by side and two power vacuum tubes attached to respective ends of a cylindrical conductor. A conductive yoke is located at the other end of the cylindrical conductors to short circuit the two cylindrical conductors. The coupling transition includes two relatively flat rectangular conductors extending perpendicular to the longitudinal axes of a respective cylindrical conductor to which the flat conductor is attached intermediate the ends thereof. Conductive side covers and end covers are also provided for forming pockets in the waveguide into which the flat conductors extend when the waveguide is attached to a shielding enclosure surrounding the resonant circuit.

  1. A hierarchical circuit extractor

    E-Print Network [OSTI]

    Ledbetter, William Burl

    1982-01-01T23:59:59.000Z

    Hierarchical Circuit Extractor (May 1982) William Burl Ledbetter Jr. , B. S. , Texas ASM University Co-Chairmen of Advisory Committee: Dr. Phil S. Noe and Dr. Noel R. Strader This thesi s describes the development of a hierarchical circuit extraction.... ACKNOWLEDGMENTS I would like to express my gratitude to Dr. N. R. Strader for his help in the preparation of this thesis and for the use of his rasteri zer in LEXTRACT. I also thank Dr. P. S. Noe, Dr. P. E. Allen, and Dr. W. M. Lively for serving on my...

  2. Electrical Circuit Tester

    DOE Patents [OSTI]

    Love, Frank (Amarillo, TX)

    2006-04-18T23:59:59.000Z

    An electrical circuit testing device is provided, comprising a case, a digital voltage level testing circuit with a display means, a switch to initiate measurement using the device, a non-shorting switching means for selecting pre-determined electrical wiring configurations to be tested in an outlet, a terminal block, a five-pole electrical plug mounted on the case surface and a set of adapters that can be used for various multiple-pronged electrical outlet configurations for voltages from 100 600 VAC from 50 100 Hz.

  3. UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY

    SciTech Connect (OSTI)

    Reza Kazimi, Arne Freyberger, Alicia Hofler, Andrew Hutton, Fay Hannon

    2012-07-01T23:59:59.000Z

    The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

  4. Detector development for Jefferson Lab's 12GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qiang, Yi [JLAB] (ORCID:0000000170267841)

    2015-05-01T23:59:59.000Z

    Jefferson Lab will soon finish its highly anticipated 12 GeV Upgrade. With doubled maximum energy, Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) will enable a new experimental program with substantial discovery potential, addressing important topics in nuclear, hadronic and electroweak physics. In order to take full advantage of the high energy, high luminosity beam, new detectors are being developed, designed and constructed to fit the needs of different physics topics. The paper will give an overview of various new detector technologies to be used for 12 GeV experiments. It will then focus on the development of two solenoid-based spectrometers, the GlueX and SoLID spectrometers. The GlueX experiment in Hall D will study the complex properties of gluons through exotic hybrid meson spectroscopy. The GlueX spectrometer, a hermetic detector package designed for spectroscopy and the associated partial wave analysis, is currently in the final stage of construction. Hall A, on the other hand, is developing the SoLID spectrometer to capture the 3D image of the nucleon from semi-inclusive processes and to study the intrinsic properties of quarks through mirror symmetry breaking. Such a spectrometer will have the capability to handle very high event rates while still maintaining a large acceptance in the forward region.

  5. Detector development for Jefferson Lab's 12GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qiang, Yi

    2015-05-01T23:59:59.000Z

    Jefferson Lab will soon finish its highly anticipated 12 GeV Upgrade. With doubled maximum energy, Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) will enable a new experimental program with substantial discovery potential, addressing important topics in nuclear, hadronic and electroweak physics. In order to take full advantage of the high energy, high luminosity beam, new detectors are being developed, designed and constructed to fit the needs of different physics topics. The paper will give an overview of various new detector technologies to be used for 12 GeV experiments. It will then focus on the development of two solenoid-based spectrometers,more »the GlueX and SoLID spectrometers. The GlueX experiment in Hall D will study the complex properties of gluons through exotic hybrid meson spectroscopy. The GlueX spectrometer, a hermetic detector package designed for spectroscopy and the associated partial wave analysis, is currently in the final stage of construction. Hall A, on the other hand, is developing the SoLID spectrometer to capture the 3D image of the nucleon from semi-inclusive processes and to study the intrinsic properties of quarks through mirror symmetry breaking. Such a spectrometer will have the capability to handle very high event rates while still maintaining a large acceptance in the forward region.« less

  6. Upgrade of Fermilab/NICADD photoinjector laboratory

    SciTech Connect (OSTI)

    Piot, P.; Edwards, H.; /Fermilab; Huning, M.; /DESY; Li, J.; Tikhoplav, R.; /Rochester U.; Koeth, T.; /Rutgers U., Piscataway

    2005-05-01T23:59:59.000Z

    The Fermilab/NICADD photoinjector laboratory is a 16 MeV electron accelerator dedicated to beam dynamics and advanced accelerator physics studies. FNPL will soon be capable of operating at {approx} 40 MeV, after the installation of a high gradient TESLA cavity. In this paper we present the foreseen design for the upgraded facility along with its performance. We discuss the possibilities of using of FNPL as an injector for the superconducting module and test facility (SM&TF).

  7. Circuit breaker lockout device

    DOE Patents [OSTI]

    Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

    1992-01-01T23:59:59.000Z

    An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

  8. Circuit breaker lockout device

    SciTech Connect (OSTI)

    Kozlowski, L.J.; Shirey, L.A.

    1991-12-31T23:59:59.000Z

    An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin is installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

  9. Circuit breaker lockout device

    DOE Patents [OSTI]

    Kozlowski, L.J.; Shirey, L.A.

    1992-11-24T23:59:59.000Z

    An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker. 2 figs.

  10. Bioluminescent bioreporter integrated circuit

    DOE Patents [OSTI]

    Simpson, Michael L. (Knoxville, TN); Sayler, Gary S. (Blaine, TN); Paulus, Michael J. (Knoxville, TN)

    2000-01-01T23:59:59.000Z

    Disclosed are monolithic bioelectronic devices comprising a bioreporter and an OASIC. These bioluminescent bioreporter integrated circuit are useful in detecting substances such as pollutants, explosives, and heavy-metals residing in inhospitable areas such as groundwater, industrial process vessels, and battlefields. Also disclosed are methods and apparatus for environmental pollutant detection, oil exploration, drug discovery, industrial process control, and hazardous chemical monitoring.

  11. Methods of fabricating applique circuits

    DOE Patents [OSTI]

    Dimos, Duane B. (Albuquerque, NM); Garino, Terry J. (Albuquerque, NM)

    1999-09-14T23:59:59.000Z

    Applique circuits suitable for advanced packaging applications are introduced. These structures are particularly suited for the simple integration of large amounts (many nanoFarads) of capacitance into conventional integrated circuit and multichip packaging technology. In operation, applique circuits are bonded to the integrated circuit or other appropriate structure at the point where the capacitance is required, thereby minimizing the effects of parasitic coupling. An immediate application is to problems of noise reduction and control in modern high-frequency circuitry.

  12. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K G; Gates, D A; Gerhardt, S P; Lawson, J E; Mozulay, R; Sichta, P; Tchilinguirian, G J

    2014-06-01T23:59:59.000Z

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  13. The APS control system network upgrade.

    SciTech Connect (OSTI)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-10-22T23:59:59.000Z

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network.

  14. ECE 202: Circuit Theory Applications

    E-Print Network [OSTI]

    Schumacher, Russ

    : - Cadence - MATLAB IN OUT - Can analyze source-free RL, RC, and RLC circuits - Can calculate step response Numbers Algebra DC Circuit Analysis - Laplace transform - Bode plots - Complex response - Can calculate Filter Analysis Frequency Response and Filters AC Power Analysis AC Circuit Analysis Concepts

  15. High voltage MOSFET switching circuit

    DOE Patents [OSTI]

    McEwan, T.E.

    1994-07-26T23:59:59.000Z

    The problem of source lead inductance in a MOSFET switching circuit is compensated for by adding an inductor to the gate circuit. The gate circuit inductor produces an inductive spike which counters the source lead inductive drop to produce a rectangular drive voltage waveform at the internal gate-source terminals of the MOSFET. 2 figs.

  16. High voltage MOSFET switching circuit

    DOE Patents [OSTI]

    McEwan, Thomas E. (Livermore, CA)

    1994-01-01T23:59:59.000Z

    The problem of source lead inductance in a MOSFET switching circuit is compensated for by adding an inductor to the gate circuit. The gate circuit inductor produces an inductive spike which counters the source lead inductive drop to produce a rectangular drive voltage waveform at the internal gate-source terminals of the MOSFET.

  17. Methods and apparatuses for preparing upgraded pyrolysis oil

    DOE Patents [OSTI]

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01T23:59:59.000Z

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  18. BNL ACCELERATOR TEST FACILITY CONTROL SYSTEM UPGRADE R. Malone...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACCELERATOR TEST FACILITY CONTROL SYSTEM UPGRADE R. Malone, I. Ben-Zvi, X. Wang, V. Yakimenko BNL , Upton, NY 11973, USA Abstract Brookhaven National Laboratory's Accelerator...

  19. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and...

  20. EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

  1. Media Advisory - Jefferson Lab 12 GeV Upgrade Groundbreaking...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for its 310 million 12 GeV Upgrade project. When: Tuesday, April 14, 2009. Where: CEBAF Center, Thomas Jefferson National Accelerator Facility, 12000 Jefferson Avenue,...

  2. asdex upgrade results: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  3. asdex upgrade invited: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  4. asdex upgrade team: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 5 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  5. asdex upgrade divertor: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 7 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  6. asdex upgrade edge: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 4 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  7. asdex upgrade enhancements: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  8. Conceptual design report for Project W-420, stack monitoring upgrade

    SciTech Connect (OSTI)

    Lott, D.T., Fluor Daniel Hanford

    1997-03-10T23:59:59.000Z

    This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

  9. Office of Energy Policy and Systems Analysis Site Upgrade

    Broader source: Energy.gov [DOE]

    Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

  10. EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE Although Maine has one of the United States' highest homeownership rates, more than one-third of the state's residents...

  11. Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...

    Broader source: Energy.gov (indexed) [DOE]

    Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities Case study details the U.S. Department of Defense (DOD) Exchange (formerly the Army and Air Force...

  12. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole Algae Hydrothermal Liquefaction...

  13. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    September 24, 2013 Clean Energy Finance: A Guide to Federal Financing Programs Available for Energy Efficiency Upgrades and Clean Energy Deployment 2 Agenda * Welcome - Molly Lunn,...

  14. Community based outreach strategies in residential energy upgrade programs

    E-Print Network [OSTI]

    McEwen, Brendan (Brendan Carl Francis)

    2012-01-01T23:59:59.000Z

    Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

  15. What's Working in Residential Energy Efficiency Upgrade Programs...

    Energy Savers [EERE]

    Texas: Best Offer Ever Produces 564 Upgrades in Record Time Better Buildings Neighborhood Program Home Accomplishments History Better Buildings Partners Stories Interviews Videos...

  16. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01T23:59:59.000Z

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore »port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less

  17. Advanced Photon Source Upgrade Project Preliminary Design Report Advanced Photon Source Upgrade Project

    E-Print Network [OSTI]

    Kemner, Ken

    .......................................................................................................1­8 1.3.3 Work Breakdown Structure Upgrade Project · Preliminary Design Report The Advanced Photon Source, an Office of Science User Facility operated for the U.S. Department of Energy (DOE) Office of Science by Argonne National Laboratory

  18. The value of steam turbine upgrades

    SciTech Connect (OSTI)

    Potter, K.; Olear, D.; [General Physics Corp. (United States)

    2005-11-01T23:59:59.000Z

    Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

  19. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

    2013-03-01T23:59:59.000Z

    This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

  20. Jefferson Lab awards upgrade contracts | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12 InvestigationLabNewLabLabbeginawards upgrade

  1. Cyclotron Institute Upgrade Project - Facilities - Cyclotron Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMFormsGas SeparationsRelevant toSiteCurrent Long-TermUpgrade Overview /

  2. Upgrading a CCD camera for astronomical use

    E-Print Network [OSTI]

    Lamecker, James Frank

    1993-01-01T23:59:59.000Z

    levels. The light source used inside the box was a green light-emitting-diode (LED). A second LED in the same circuit but outside the box was used as a brightness monitor. The LEDs were powered by a 9 volt battery and the current was controlled by a 10...

  3. The enhanced ASDEX Upgrade pellet centrifuge launcher

    SciTech Connect (OSTI)

    Plöckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-10-15T23:59:59.000Z

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  4. Bitumen utilization via partial upgrading and emulsification

    SciTech Connect (OSTI)

    Sankey, B.M.; Ghosh, M.; Chakrabarty, T. [Imperial Oil Resources Limited, Calgary, Alberta (Canada)

    1995-12-31T23:59:59.000Z

    Further development of the oil sands resources of Alberta, Canada, is constrained by the ability of downstream refineries to process the high sulfur, high viscosity, and high asphaltene content bitumen. Recent engineering studies have demonstrated that high conversion processing of bitumen to produce synthetic crude oil shows at best marginal economics. In this paper, an alternative concept of bitumen upgrading and heavy bottoms utilization is presented. The proposed method of Phased Partial Upgrading (PPU) involves, first, separation of the bitumen into a light overhead fraction and a heavy bottom fraction using conventional processes, such as distillation or solvent deasphalting. The light overhead fraction, which resembles a typical light sour crude, can be marketed directly, or can be hydrotreated to reduce sulfur and enhance quality as catalytic cracker feedstock. The PPU heavy fraction is converted to an emulsion fuel using new techniques and a proprietary surfactant formulation. This fuel can replace coal and other heavy fuels in electrical utilities. Emulsion fuel prepared in a continuous pilot unit was successfully burned in several combustion test programs.

  5. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    SciTech Connect (OSTI)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22T23:59:59.000Z

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  6. Faculty & Staff Email (Server) Upgrade How does this affect me?

    E-Print Network [OSTI]

    Seldin, Jonathan P.

    Faculty & Staff Email (Server) Upgrade How does this affect me? PC Users: No effect server to the Exchange 2010 server. Mobile phones, tablets and email clients (Microsoft Outlook? Upgrading to Exchange 2010 requires us to replace the server to which you connect to retrieve Email

  7. Rebates Cut the Price of Big-Time Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy’s rebate programs that cut the cost of whole-house energy efficiency upgrades.

  8. Chromosome doubling method

    DOE Patents [OSTI]

    Kato, Akio

    2006-11-14T23:59:59.000Z

    The invention provides methods for chromosome doubling in plants. The technique overcomes the low yields of doubled progeny associated with the use of prior techniques for doubling chromosomes in plants such as grasses. The technique can be used in large scale applications and has been demonstrated to be highly effective in maize. Following treatment in accordance with the invention, plants remain amenable to self fertilization, thereby allowing the efficient isolation of doubled progeny plants.

  9. Base drive circuit

    DOE Patents [OSTI]

    Lange, A.C.

    1995-04-04T23:59:59.000Z

    An improved base drive circuit having a level shifter for providing bistable input signals to a pair of non-linear delays. The non-linear delays provide gate control to a corresponding pair of field effect transistors through a corresponding pair of buffer components. The non-linear delays provide delayed turn-on for each of the field effect transistors while an associated pair of transistors shunt the non-linear delays during turn-off of the associated field effect transistor. 2 figures.

  10. Base drive circuit

    DOE Patents [OSTI]

    Lange, Arnold C. (Livermore, CA)

    1995-01-01T23:59:59.000Z

    An improved base drive circuit (10) having a level shifter (24) for providing bistable input signals to a pair of non-linear delays (30, 32). The non-linear delays (30, 32) provide gate control to a corresponding pair of field effect transistors (100, 106) through a corresponding pair of buffer components (88, 94). The non-linear delays (30, 32) provide delayed turn-on for each of the field effect transistors (100, 106) while an associated pair of transistors (72, 80) shunt the non-linear delays (30, 32) during turn-off of the associated field effect transistor (100, 106).

  11. Threshold voltage extraction circuit

    E-Print Network [OSTI]

    Hoon, Siew Kuok

    2000-01-01T23:59:59.000Z

    to that of the saturation method. However, instead of fixing Vos ? Vos, the drain current is measured as a function of Vos while Vns is fixed at a constant low voltage of 100mV to ensure operation in the linear MOSFET region. Neglecting channel length modulation effect... transistors are layout next to the DUT of the NMOS and PMOS Vr extraction circuits respectively for extraction of Vr via graphical means. GRAPHICAL METHOD OF THE THRESHOLD-VOLTAGE MEASUREMENT Using the graphical method, the characteristics of 4n versus Vos...

  12. Sandia National Laboratories: Upgrades to SNL-EFDC: A Tool to...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ClimateECEnergyComputational Modeling & SimulationUpgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy Generation Efficiency with Environmental Response Upgrades to...

  13. U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava...

    Energy Savers [EERE]

    And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am...

  14. Thvenin's Theorem Linear two-terminal circuit

    E-Print Network [OSTI]

    Kozick, Richard J.

    Thévenin's Theorem Linear two-terminal circuit can be replaced by an equivalent circuit composed at terminals with allResistance at terminals with all independent circuit sources set to zero #12;Norton's Theorem Linear two-terminal circuit can be replaced by an equivalentbe replaced by an equivalent circuit

  15. Jitter compensation circuit

    DOE Patents [OSTI]

    Sullivan, J.S.; Ball, D.G.

    1997-09-09T23:59:59.000Z

    The instantaneous V{sub co} signal on a charging capacitor is sampled and the charge voltage on capacitor C{sub o} is captured just prior to its discharge into the first stage of magnetic modulator. The captured signal is applied to an averaging circuit with a long time constant and to the positive input terminal of a differential amplifier. The averaged V{sub co} signal is split between a gain stage (G = 0.975) and a feedback stage that determines the slope of the voltage ramp applied to the high speed comparator. The 97.5% portion of the averaged V{sub co} signal is applied to the negative input of a differential amplifier gain stage (G = 10). The differential amplifier produces an error signal by subtracting 97.5% of the averaged V{sub co} signal from the instantaneous value of sampled V{sub co} signal and multiplying the difference by ten. The resulting error signal is applied to the positive input of a high speed comparator. The error signal is then compared to a voltage ramp that is proportional to the averaged V{sub co} values squared divided by the total volt-second product of the magnetic compression circuit. 11 figs.

  16. Jitter compensation circuit

    DOE Patents [OSTI]

    Sullivan, James S. (Livermore, CA); Ball, Don G. (Livermore, CA)

    1997-01-01T23:59:59.000Z

    The instantaneous V.sub.co signal on a charging capacitor is sampled and the charge voltage on capacitor C.sub.o is captured just prior to its discharge into the first stage of magnetic modulator. The captured signal is applied to an averaging circuit with a long time constant and to the positive input terminal of a differential amplifier. The averaged V.sub. co signal is split between a gain stage (G=0.975) and a feedback stage that determines the slope of the voltage ramp applied to the high speed comparator. The 97.5% portion of the averaged V.sub.co signal is applied to the negative input of a differential amplifier gain stage (G=10). The differential amplifier produces an error signal by subtracting 97.5% of the averaged V.sub.co signal from the instantaneous value of sampled V.sub.co signal and multiplying the difference by ten. The resulting error signal is applied to the positive input of a high speed comparator. The error signal is then compared to a voltage ramp that is proportional to the averaged V.sub.co values squared divided by the total volt-second product of the magnetic compression circuit.

  17. Thvenin Emitter Circuit The Thvenin equivalent circuit seen looking into the emitter is useful in calculating

    E-Print Network [OSTI]

    Leach Jr.,W. Marshall

    voltage ve(oc) to the short-circuit emitter current. The circuit for calculating the short-circuit currentThévenin Emitter Circuit The Thévenin equivalent circuit seen looking into the emitter is useful. With the emitter open circuited, we denote the emitter voltage by ve(oc). The voltage source in the Thévenin

  18. Tenneco upgrades system with equipment conversion

    SciTech Connect (OSTI)

    Wright, K. [Ariel Corp., Mt. Vernon, OH (United States)

    1995-10-01T23:59:59.000Z

    Tenneco Gas, Inc., Houston, recently completed the successful conversion of over 14,300 horsepower compression equipment at its transmission in Catlettsburg, KY. The system consists of three identical Ariel JGC/6 compressors, driven by three matching Ansaldo electric motors, capable of running between 450 and 900 rpm. These variable speed, synchronous electric motors allow for greater flexibility, without the use of traditional cylinder unloaders. If desired Eureka Energy Systems, Richardson, TX designed the compressor package. One of Tenneco`s objectives when selecting a package to upgrade existing compression capabilities was to ensure compliance with future regulations promulgated pursuant to the Clean Air Act Amendments of 1990. Initially, Tenneco considered separable compressors because of the availability of the newer, clean burning, gas ignited drivers in the 5,000 horsepower range, such as the Caterpillar 3612 and 3616. This paper reviews the design, performance and comparative operating cost of these compressor units.

  19. Steam turbine upgrading: low-hanging fruit

    SciTech Connect (OSTI)

    Peltier, R.

    2006-04-15T23:59:59.000Z

    The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

  20. LLRF System for the CEBAF Separator Upgrade

    SciTech Connect (OSTI)

    Plawski, Tomasz E. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curt [JLAB; Seidman, David J. [JLAB; Wissmann, Mark J. [JLAB

    2014-12-01T23:59:59.000Z

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  1. Upgraded HFIR Fuel Element Welding System

    SciTech Connect (OSTI)

    Sease, John D [ORNL

    2010-02-01T23:59:59.000Z

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  2. Demultiplexer circuit for neural stimulation

    DOE Patents [OSTI]

    Wessendorf, Kurt O; Okandan, Murat; Pearson, Sean

    2012-10-09T23:59:59.000Z

    A demultiplexer circuit is disclosed which can be used with a conventional neural stimulator to extend the number of electrodes which can be activated. The demultiplexer circuit, which is formed on a semiconductor substrate containing a power supply that provides all the dc electrical power for operation of the circuit, includes digital latches that receive and store addressing information from the neural stimulator one bit at a time. This addressing information is used to program one or more 1:2.sup.N demultiplexers in the demultiplexer circuit which then route neural stimulation signals from the neural stimulator to an electrode array which is connected to the outputs of the 1:2.sup.N demultiplexer. The demultiplexer circuit allows the number of individual electrodes in the electrode array to be increased by a factor of 2.sup.N with N generally being in a range of 2-4.

  3. Photoconductive circuit element reflectometer

    DOE Patents [OSTI]

    Rauscher, Christen (Alexandria, VA)

    1990-01-01T23:59:59.000Z

    A photoconductive reflectometer for characterizing semiconductor devices at millimeter wavelength frequencies where a first photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short first laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test. Second PCEs are connected along the transmission line to sample the signals on the transmission line when excited into conductance by short second laser light pulses, spaced apart in time a variable period from the first laser light pulses. Electronic filters connected to each of the second PCEs act as low-pass filters and remove parasitic interference from the sampled signals and output the sampled signals in the form of slowed-motion images of the signals on the transmission line.

  4. Photoconductive circuit element reflectometer

    DOE Patents [OSTI]

    Rauscher, C.

    1987-12-07T23:59:59.000Z

    A photoconductive reflectometer for characterizing semiconductor devices at millimeter wavelength frequencies where a first photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short first laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test. Second PCEs are connected along the transmission line to sample the signals on the transmission line when excited into conductance by short second laser light pulses, spaced apart in time a determinable period from the first laser light pulses. Electronic filters connected to each of the second PCEs act as low-pass filters and remove parasitic interference from the sampled signals and output the sampled signals in the form of slowed-motion images of the signals on the transmission line. 4 figs.

  5. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B [ORNL] [ORNL

    2014-01-01T23:59:59.000Z

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  6. Superconducting RF Lab Facility Upgrades at Los Alamos

    SciTech Connect (OSTI)

    Katonak, D.J.; Rusnak, B.

    1999-03-01T23:59:59.000Z

    Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

  7. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    DOE Patents [OSTI]

    Gordon, John Howard

    2014-09-09T23:59:59.000Z

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  8. Double Beta Decay: Scintillators

    E-Print Network [OSTI]

    Mark C. Chen

    2008-10-20T23:59:59.000Z

    Scintillator detectors can be used in experiments searching for neutrinoless double beta decay. A wide variety of double beta decay candidate isotopes can be made into scintillators or can be loaded into scintillators. Experimental programs developing liquid xenon, inorganic crystals, and Nd-loaded liquid scintillator are described in this review. Experiments with 48Ca and 150Nd benefit from their high endpoint which places the neutrinoless double beta decay signal above most backgrounds from natural radioactivity.

  9. Counterpulse railgun energy recovery circuit

    DOE Patents [OSTI]

    Honig, E.M.

    1984-09-28T23:59:59.000Z

    The invention presented relates to a high-power pulsing circuit and more particularly to a repetitive pulse inductive energy storage and transfer circuit for an electromagnetic launcher. In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, a counterpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

  10. Overpulse railgun energy recovery circuit

    DOE Patents [OSTI]

    Honig, E.M.

    1984-09-28T23:59:59.000Z

    The invention presented relates to a high-power pulsing circuit and more particularly to a repetitive pulse inductive energy storage and transfer circuit for an electromagnetic launcher. In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, an overpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

  11. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Broader source: Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  12. Using QECBs for Street Lighting Upgrades: Lighting the Way to...

    Broader source: Energy.gov (indexed) [DOE]

    Summarizes how the City of San Diego leveraged 13.1 million in qualified energy conservation bonds to increase the size of a street lighting upgrade project. Author: Lawrence...

  13. Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  14. Energy and Emissions Savings through Insulation Upgrade Projects

    E-Print Network [OSTI]

    Lettich, M.

    2008-01-01T23:59:59.000Z

    The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental...

  15. Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems

    E-Print Network [OSTI]

    Ertle, J. M.

    in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

  16. Biofuels from Corn Stover: Pyrolytic Production and Catalytic Upgrading Studies 

    E-Print Network [OSTI]

    Capunitan, Jewel Alviar

    2013-01-15T23:59:59.000Z

    Due to security issues in energy supply and environmental concerns, renewable energy production from biomass becomes an increasingly important area of study. Thus, thermal conversion of biomass via pyrolysis and subsequent upgrading procedures were...

  17. Honeymoons Lead to Upgrades in Western Vermont | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    month at a low interest rate. "We believe clients view this lag time as an added bonus to the other benefits they are experiencing with energy efficiency upgrades" says...

  18. Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the...

  19. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Broader source: Energy.gov (indexed) [DOE]

    how the J.R. Simplot Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade...

  20. Providing protection: Agencies receive funding to repair, upgrade dams

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01T23:59:59.000Z

    Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations..., called floodwater retarding structures and built mostly in rural areas during the 1950s to 1970s, are aging and need repairing. Others now protect urban areas that have developed downstream and need upgrading to meet more stringent safety standards...

  1. Upgrade Your Lighting & Open the Door to Energy Savings

    E-Print Network [OSTI]

    Houcek, J. K.

    2006-01-01T23:59:59.000Z

    Upgrade Your Lighting & Open the Door to Energy Savings John K. Houcek, Energy Monitoring & Analysis Services The purpose of this paper is to convince the reader that the time has come to take a close look at the lighting energy usage... savings as well as payback periods. There is no single lighting upgrade solution that covers such a wide variety of facility types. Next, a methodology is presented that describes the lighting audit process from the initial survey to the final report...

  2. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    SciTech Connect (OSTI)

    Neumeyer, C; Chrzanowski, J; Dudek, L; Fan, H; Hatcher, R; Heitzenroeder, P; Menard, J; Ono, M; Ramakrishnan, S; Titus, P; Woolley, R

    2009-09-24T23:59:59.000Z

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ~ 3 and makes possible higher levels of performance and pulse duration.

  3. Hygroscopic Fine Mode Particle Deposition on Electronic Circuits and Resulting Degradation of Circuit Performance: An Experimental Study

    E-Print Network [OSTI]

    Litvak, A.

    2011-01-01T23:59:59.000Z

    electronic components, circuits, and spacing between adjacent conductors continues to get smaller ; degradation of circuit reliability

  4. Commissioning results from the recently upgraded RHIC LLRF system

    SciTech Connect (OSTI)

    Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

    2011-03-28T23:59:59.000Z

    During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

  5. Combination process for upgrading residual oils

    SciTech Connect (OSTI)

    Busch, L.E.; Walters, P.W.; Zandona, O.

    1990-01-16T23:59:59.000Z

    This patent describes a method for upgrading high boiling residual portions of crude oils comprising metal contaminants, porphyrins, asphaltenes and high molecular weight multi-ring hydrocarbon material. It comprises: charging a high boiling residual portion of crude oil admixed with diluent in contact with suspended upflowing substantially inert fluidizable solids particulate material at an elevated thermal visbreaking temperature in a riser contact zone for a time sufficient to recover therefrom a vaporous hydrocarbon product higher boiling than gasoline partially decarbonized and demetallized to a lower contaminating metals level, quenching the vaporous product of thermal visbreaking below its dew point after separation from solids, charging quenched thermally modified high boiling hydrocarbon product with a crystalline zeolite cracking catalyst under cracking conditions for a hydrocarbon residence time in a riser cracking zone; recovering a hydrocarbon conversion product; separating a combined C{sub 4} minus wet gas product stream of the visbreaking and zeolite catalyst cracking operating to recover a C{sub 3}-C{sub 4} rich fraction separately from a C{sub 2} minus dry gas product fraction, and regenerating the crystalline zeolite contcontaining catalyst.

  6. Screening of processing and upgrading schemes

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  7. Process for upgrading tar sand bitumen

    SciTech Connect (OSTI)

    Bartholic, D.B.; Reagan, W.J.

    1989-04-04T23:59:59.000Z

    A process is described for upgrading a charge of a tar sand bitumen concentrate containing mineral matter including fine particles which comprises contacting the charge in a riser in the presence of a low boiling organic solvent diluent with finely divided attrition-resistant particles of a hot fluidizable substantially catalytically inert solid which is substantially chemically inert to a solution of mineral acid. The contact of the charge with the particles is at high temperature and short contact time to vaporize the high hydrogen containing components of the bitumen, the period of time being less than that which induces substantial thermal cracking of the charge, at the end of the time separating the vaporizing product from the fluidizable particles. The fluidizable particles now bear a deposit of both combustible solid, adherent particles of fine particles of mineral matter and metals. The particles of inert solid are passed with deposit of combustibles and fine particles of mineral matter to a regenerator to oxidize the combustible portion of the deposits, removing at least a portion of deposit of mineral matter and metals by removing the inert solid from the regenerator and contacting removed inert solid with a hot mineral acid, and recirculating fluidizable solid depleted at least in part of deposited mineral matter to contact with incoming charge of tar sand bitumen concentrate and diluent.

  8. Process for upgrading tar sand bitumen

    SciTech Connect (OSTI)

    Bartholic, D.B.; Reagan, W.J.

    1989-02-14T23:59:59.000Z

    A process is described for upgrading a charge of a tar sand bitumen concentrate containing metal impurities, colloidal calcium-containing clay and water. It consists of contacting the charge in a riser contacting zone in the presence of a low boiling organic solvent with hot fluidizable attrition-resistant substantially catalytically-inert microspheres, which are 20 to 150 microns in diameter and are composed of previously calcined kaolin clay. The contact takes place at high temperature and short contact time, which permits vaporization of the high hydrogen containing components of the bitumen. The period of time is less than that which induces substantial thermal cracking of the charge. At the end of the time the vaporized produce is separated from the microspheres of calcined kaolin clay, the microspheres of calcined kaolin clay now bearing a deposit of combustible solid, metal impurities and adherent particles of colloidal calcium-containing clay originally contained in the bitumen concentrate, immediately reducing the temperature of the vaporized product to minimize thermal cracking and recovering the product for further refining to produce one or more premium products.

  9. Upgrade to the Birmingham Irradiation Facility

    E-Print Network [OSTI]

    Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

    2015-01-01T23:59:59.000Z

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 ?A and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

  10. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31T23:59:59.000Z

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  11. NSTX Program Overview andNSTX Program Overview and NSTX Upgrade Physics Design ProgressNSTX Upgrade Physics Design Progress

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -B318, PPPL NSTXNSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INL in Upgrade 6. Develop normally-conducting radiation-tolerant magnets for ST applications · Desig

  12. Tunable circuit for tunable capacitor devices

    SciTech Connect (OSTI)

    Rivkina, Tatiana; Ginley, David S.

    2006-09-19T23:59:59.000Z

    A tunable circuit (10) for a capacitively tunable capacitor device (12) is provided. The tunable circuit (10) comprises a tunable circuit element (14) and a non-tunable dielectric element (16) coupled to the tunable circuit element (16). A tunable capacitor device (12) and a method for increasing the figure of merit in a tunable capacitor device (12) are also provided.

  13. Electronic circuit implementation of chaos synchronization

    E-Print Network [OSTI]

    Ravi Ranjan; Shivshankar Mishra; Suneel Madhekar

    2012-07-20T23:59:59.000Z

    In this paper, an electronic circuit implementation of a robustly chaotic two-dimensional map is presented. Two such electronic circuits are realized. One of the circuits is configured as the driver and the other circuit is configured as the driven system. Synchronization of chaos between the driver and the driven system is demonstrated.

  14. NPTEL Syllabus Basic Electrical Circuits -Video course

    E-Print Network [OSTI]

    Krishnapura, Nagendra

    with an introduction to basic linear elements used in electrical circuits. Mesh and node analysis for systematic analysis of large circuits will be studied. Fundamental circuit theorems and their use in analysis steady state analysis for simple analysis of such circuits will be studied. The concepts of power

  15. Reverse engineering of integrated circuits

    DOE Patents [OSTI]

    Chisholm, Gregory H. (Shorewood, IL); Eckmann, Steven T. (Colorado Springs, CO); Lain, Christopher M. (Pittsburgh, PA); Veroff, Robert L. (Albuquerque, NM)

    2003-01-01T23:59:59.000Z

    Software and a method therein to analyze circuits. The software comprises several tools, each of which perform particular functions in the Reverse Engineering process. The analyst, through a standard interface, directs each tool to the portion of the task to which it is most well suited, rendering previously intractable problems solvable. The tools are generally used iteratively to produce a successively more abstract picture of a circuit, about which incomplete a priori knowledge exists.

  16. Double beta decay experiments

    E-Print Network [OSTI]

    A. S. Barabash

    2006-02-22T23:59:59.000Z

    The present status of double beta decay experiments are reviewed. The results of the most sensitive experiments, NEMO-3 and CUORICINO, are discussed. Proposals for future double beta decay experiments are considered. In these experiments sensitivity for the effective neutrino mass will be on the level of (0.1-0.01) eV.

  17. Double beta decay experiments

    E-Print Network [OSTI]

    A. S. Barabash

    2011-07-28T23:59:59.000Z

    The present status of double beta decay experiments is reviewed. The results of the most sensitive experiments are discussed. Proposals for future double beta decay experiments with a sensitivity to the $$ at the level of (0.01--0.1) eV are considered.

  18. Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade

    SciTech Connect (OSTI)

    Graca, S.; Santos, J.; Manso, M.E. [Associacao EURATOM/IST, Centro de Fusao Nuclear, Instituto Superior Tecnico, 1049-001 Lisbon (Portugal)

    2004-10-01T23:59:59.000Z

    The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut fuer Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusao Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls.

  19. Photon-mediated electron transport in hybrid circuit-QED

    E-Print Network [OSTI]

    Neill Lambert; Christian Flindt; Franco Nori

    2013-07-25T23:59:59.000Z

    We investigate photon-mediated transport processes in a hybrid circuit-QED structure consisting of two double quantum dots coupled to a common microwave cavity. Under suitable resonance conditions, electron transport in one double quantum dot is facilitated by the transport in the other dot via photon-mediated processes through the cavity. We calculate the average current in the quantum dots, the mean cavity photon occupation, and the current cross-correlations with both a full numerical simulation and a recursive perturbation scheme that allows us to include the influence of the cavity order-by-order in the couplings between the cavity and the quantum dot systems. We can then clearly identify the photon-mediated transport processes.

  20. STAR inner tracking upgrade - A performance study

    E-Print Network [OSTI]

    Jan Kapitan; for the STAR Collaboration

    2009-01-19T23:59:59.000Z

    Anisotropic flow measurements have demonstrated development of partonic collectivity in $200\\mathrm{GeV}$ Au+Au collisions at RHIC. To understand the partonic EOS, thermalization must be addressed. Collective motion of heavy-flavor (c,b) quarks can be used to indicate the degree of thermalization of the light-flavor quarks (u,d,s). Measurement of heavy-flavor quark collectivity requires direct reconstruction of heavy-flavor hadrons in the low $\\pt$ region. Measurement of open charm spectra to high $\\pt$ can be used to investigate heavy-quark energy loss and medium properties. The Heavy Flavor Tracker (HFT), a proposed upgrade to the STAR experiment at midrapidity, will measure $v_{2}$ of open-charm hadrons to very low $\\pt$ by reconstructing their displaced decay vertices. The innermost part of the HFT is the PIXEL detector (made of two low mass monolithic active pixel sensor layers), which delivers a high precision position measurement close to the collision vertex. The Intermediate Silicon Tracker (IST), a 1-layer strip detector, is essential to improve hit identification in the PIXEL detector when running at full RHIC-II luminosity. Using a full GEANT simulation, open charm measurement capabilities of STAR with the HFT will be shown. Its performance in a broad $\\pt$ range will be demonstrated on $v_{2}$ ($\\pt > 0.5\\mathrm{GeV}/c$) and $R_\\mathrm{CP}$ ($\\pt < 10\\mathrm{GeV}/c$) measurements of $\\D$ meson. Results of reconstruction of $\\Lc$ baryon in heavy-ion collisions are presented.

  1. Circuits & Systems Test Circuits for Characterization of Process, Device, and Interconnect Variation ................................................................................. CS.1

    E-Print Network [OSTI]

    Reif, Rafael

    Circuits & Systems Test Circuits for Characterization of Process, Device, and Interconnect................................................................................................. CS.2 45nm Direct-battery DC-DC Converter for Mobile Applications

  2. Double field theory

    E-Print Network [OSTI]

    Hull, Chris

    The zero modes of closed strings on a torus — the torus coordinates plus dual coordinates conjugate to winding number — parameterize a doubled torus. In closed string field theory, the string field depends on all zero-modes ...

  3. Neutrinoless double beta decay

    E-Print Network [OSTI]

    K. Zuber

    2012-01-23T23:59:59.000Z

    The physics potential of neutrinoless double beta decay is discussed. Furthermore, experimental considerations are presented as well as the current status of experiments. Finally an outlook towards the future, work on nuclear matrix elements and alternative processes is given.

  4. Double Beta Decay

    E-Print Network [OSTI]

    Steven R. Elliott; Petr Vogel

    2002-02-27T23:59:59.000Z

    The motivation, present status, and future plans of the search for the neutrinoless double beta decay are reviewed. It is argued that, motivated by the recent observations of neutrino oscillations, there is a reasonable hope that neutrinoless double beta decay corresponding to the neutrino mass scale suggested by oscillations, of about 50 meV, actually exists. The challenges to achieve the sensitivity corresponding to this mass scale, and plans to overcome them, are described.

  5. Nuclear sensor signal processing circuit

    DOE Patents [OSTI]

    Kallenbach, Gene A. (Bosque Farms, NM); Noda, Frank T. (Albuquerque, NM); Mitchell, Dean J. (Tijeras, NM); Etzkin, Joshua L. (Albuquerque, NM)

    2007-02-20T23:59:59.000Z

    An apparatus and method are disclosed for a compact and temperature-insensitive nuclear sensor that can be calibrated with a non-hazardous radioactive sample. The nuclear sensor includes a gamma ray sensor that generates tail pulses from radioactive samples. An analog conditioning circuit conditions the tail-pulse signals from the gamma ray sensor, and a tail-pulse simulator circuit generates a plurality of simulated tail-pulse signals. A computer system processes the tail pulses from the gamma ray sensor and the simulated tail pulses from the tail-pulse simulator circuit. The nuclear sensor is calibrated under the control of the computer. The offset is adjusted using the simulated tail pulses. Since the offset is set to zero or near zero, the sensor gain can be adjusted with a non-hazardous radioactive source such as, for example, naturally occurring radiation and potassium chloride.

  6. Vertically Integrated Circuits at Fermilab

    SciTech Connect (OSTI)

    Deptuch, Grzegorz; Demarteau, Marcel; Hoff, James; Lipton, Ronald; Shenai, Alpana; Trimpl, Marcel; Yarema, Raymond; Zimmerman, Tom; /Fermilab

    2009-01-01T23:59:59.000Z

    The exploration of the vertically integrated circuits, also commonly known as 3D-IC technology, for applications in radiation detection started at Fermilab in 2006. This paper examines the opportunities that vertical integration offers by looking at various 3D designs that have been completed by Fermilab. The emphasis is on opportunities that are presented by through silicon vias (TSV), wafer and circuit thinning and finally fusion bonding techniques to replace conventional bump bonding. Early work by Fermilab has led to an international consortium for the development of 3D-IC circuits for High Energy Physics. The consortium has submitted over 25 different designs for the Fermilab organized MPW run organized for the first time.

  7. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema (OSTI)

    None

    2011-10-06T23:59:59.000Z

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  8. Upgrade of absolute extreme ultraviolet diagnostic on J-TEXT

    SciTech Connect (OSTI)

    Zhang, X. L.; Cheng, Z. F., E-mail: chengfe@hust.edu.cn; Hou, S. Y.; Zhuang, G.; Luo, J. [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2014-11-15T23:59:59.000Z

    The absolute extreme ultraviolet (AXUV) diagnostic system is used for radiation observation on J-TEXT tokamak [J. Zhang, G. Zhuang, Z. J. Wang, Y. H. Ding, X. Q. Zhang, and Y. J. Tang, Rev. Sci. Instrum. 81, 073509 (2010)]. The upgrade of the AXUV system is aimed to improve the spatial resolution and provide a three-dimensional image on J-TEXT. The new system consists of 12 AXUV arrays (4 AXUV16ELG arrays, 8 AXUV20ELG arrays). The spatial resolution in the cross-section is 21 mm for the AXUV16ELG arrays and 17 mm for the AXUV20ELG arrays. The pre-amplifier is also upgraded for a higher signal to noise ratio. By upgrading the AXUV imaging system, a more accurate observation on the radiation information is obtained.

  9. Fermionic Models with Superconducting Circuits

    E-Print Network [OSTI]

    U. Las Heras; L. García-Álvarez; A. Mezzacapo; E. Solano; L. Lamata

    2015-03-31T23:59:59.000Z

    We propose a method for the efficient quantum simulation of fermionic systems with superconducting circuits. It consists in the suitable use of Jordan-Wigner mapping, Trotter decomposition, and multiqubit gates, be with the use of a quantum bus or direct capacitive couplings. We apply our method to the paradigmatic cases of 1D and 2D Fermi-Hubbard models, involving couplings with nearest and next-nearest neighbours. Furthermore, we propose an optimal architecture for this model and discuss the benchmarking of the simulations in realistic circuit quantum electrodynamics setups.

  10. Fermionic Models with Superconducting Circuits

    E-Print Network [OSTI]

    U. Las Heras; L. García-Álvarez; A. Mezzacapo; E. Solano; L. Lamata

    2014-11-10T23:59:59.000Z

    We propose a method for the efficient quantum simulation of fermionic systems with superconducting circuits. It consists in the suitable use of Jordan-Wigner mapping, Trotter decomposition, and multiqubit gates, be with the use of a quantum bus or direct capacitive couplings. We apply our method to the paradigmatic cases of 1D and 2D Fermi-Hubbard models, involving couplings with nearest and next-nearest neighbours. Furthermore, we propose an optimal architecture for this model and discuss the benchmarking of the simulations in realistic circuit quantum electrodynamics setups.

  11. Nuclear power plant security systems - The need for upgrades

    SciTech Connect (OSTI)

    Murskyj, M.P.; Furlow, C.H.

    1989-01-01T23:59:59.000Z

    Most perimeter security systems for nuclear power plants were designed and installed in the late 1970s or early 1980s. This paper explores the need to regularly evaluate and possibly upgrade a security system in the area of perimeter intrusion detection and surveillance. this paper discusses US Nuclear Regulatory Commission audits and regulatory effectiveness reviews (RERs), which have raised issues regarding the performance of perimeter security systems. The audits and RERs identified various degrees of vulnerability in certain aspects of existing perimeter security systems. In addition to reviewing the regulatory concerns, this paper discusses other reasons to evaluate and/or upgrade a perimeter security system.

  12. The 12 GeV JLab Upgrade Project

    SciTech Connect (OSTI)

    Smith, Elton

    2009-01-01T23:59:59.000Z

    The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

  13. The 12 GeV JLab Upgrade Project

    E-Print Network [OSTI]

    Elton S. Smith

    2009-01-21T23:59:59.000Z

    The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

  14. An Analysis of Building Envelope Upgrades for Residential Energy Efficiency in Hot and Humid Climates

    E-Print Network [OSTI]

    Malhotra, M.; Haberl, J.

    This paper presents the results of the analyses of various envelope upgrades for residential energyefficiency in hot and humid climates. The building components considered for the upgrades include: building shape, construction type, roof...

  15. Q&A: Financing Energy Efficiency Upgrades for Your Home through...

    Office of Environmental Management (EM)

    Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans February 19, 2015...

  16. Motor System Upgrades Smooth the Way to Savings of $700,000 at...

    Broader source: Energy.gov (indexed) [DOE]

    System Upgrades Smooth the Way to Savings of 700,000 at Chevron Refinery Motor System Upgrades Smooth the Way to Savings of 700,000 at Chevron Refinery Chevron, the largest U.S....

  17. Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

  18. An Analysis of Building Envelope Upgrades for Residential Energy Efficiency in Hot and Humid Climates 

    E-Print Network [OSTI]

    Malhotra, M.; Haberl, J.

    2006-01-01T23:59:59.000Z

    This paper presents the results of the analyses of various envelope upgrades for residential energyefficiency in hot and humid climates. The building components considered for the upgrades include: building shape, construction ...

  19. Post regulation circuit with energy storage

    DOE Patents [OSTI]

    Ball, Don G. (Livermore, CA); Birx, Daniel L. (Oakley, CA); Cook, Edward G. (Livermore, CA)

    1992-01-01T23:59:59.000Z

    A charge regulation circuit provides regulation of an unregulated voltage supply and provides energy storage. The charge regulation circuit according to the present invention provides energy storage without unnecessary dissipation of energy through a resistor as in prior art approaches.

  20. Circuit Optimization Using Efficient Parallel Pattern Search

    E-Print Network [OSTI]

    Narasimhan, Srinath S.

    2011-08-08T23:59:59.000Z

    Circuit optimization is extremely important in order to design today's high performance integrated circuits. As systems become more and more complex, traditional optimization techniques are no longer viable due to the complex and simulation...

  1. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  2. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  3. 20Engineering Gene Circuits: Foundations

    E-Print Network [OSTI]

    You, Lingchong

    ................................................................. 20-363 20.2 Designing Gene Circuits............................................. 20-364 Modeling characterized as ``robustness.'' Based on extensive studies over the last several decades, much engineered switches [11­14], oscillators [15,16], logic gates [17­19], metabolic control [20], reengineered

  4. ECE 2100 Circuit Analysis NAME: ________________________________________________

    E-Print Network [OSTI]

    Miller, Damon A.

    ECE 2100 Circuit Analysis Fall 2011 Exam #1 NAME Schematics drawn using LTspice IV (linear.com). Some problems might be adapted from the course text Schematics drawn using LTspice IV (linear.com). Some problems might be adapted from the course text

  5. Analysis and design of reliable nanometer circuits

    E-Print Network [OSTI]

    Zhao, Chong

    2007-01-01T23:59:59.000Z

    methodology is the key first step toward design of low-cost, highly robust nanometer circuit systems. Soft

  6. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    SciTech Connect (OSTI)

    Huber, T.E.

    1995-10-24T23:59:59.000Z

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ``Low Level Waste Treatment Facility`` and C-031H ``PFP Liquid Effluent Facilities``. Part of the new en`s change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site.

  7. Design aspects of upgradation from 6 pulse to 12 pulse operation of NHVDC project

    SciTech Connect (OSTI)

    Singhal, A.; Gera, R.; Tripathy, A.K.; Adhikari, T.; Hanif, M. [Bharat Heavy Electricals Ltd., New Delhi (India). Transmission Projects Dept.; Prakash, K.S.; Das, R.L. [Bharat Heavy Electricals Ltd., Bangalore (India). Electronics Div.

    1995-12-31T23:59:59.000Z

    In India, the first HVDC project was a back to back link between the northern grid and the Western grid at Vindhyachal. This project was commissioned by an external agency. By 1982 it was abundantly clear that HVDC would find a significant place in Indian power system. Government of India in its wisdom approved a proposal for an experimental HVDC line project to give Indian planners, manufacturers and utilities an opportunity to absorb the technology. The stage-1 of this National HVDC (NHVDC) project was successfully commissioned in October 1990, and has since been operating quite satisfactorily. In continuation of that effort, Government of India has since approved stage-2 of NHVDC project, which is under execution, at present. In stage-1, the challenge was to do the system studies, manufacture main circuit equipment and develop a controller. In stage-2 the focus will be on modernization and project engineering. The major change in stage-2 shall be the modernization of the controls. Upgradation details and the care being taken to have minimum disturbance to the existing setup, it discussed in this paper. The operational requirements, system solutions and control system aspects which have been considered and are being implemented for this project are also covered.

  8. Circuit Quantum Electrodynamics with Electrons on Helium

    E-Print Network [OSTI]

    Circuit Quantum Electrodynamics with Electrons on Helium A Dissertation Presented to the Faculty Fragner All rights reserved. ii #12;Abstract Circuit Quantum Electrodynamics with Electrons on Helium helium. Such a system represents a solid-state, electrical circuit analog of atomic cavity QED in which

  9. Voltage, energy and power in electric circuits

    E-Print Network [OSTI]

    Berzins, M.

    Voltage, energy and power in electric circuits Science teaching unit #12;Disclaimer The Department-2008DVD-EN Voltage, energy and power in electric circuits #12;#12;© Crown copyright 2008 1The National Strategies | Secondary Voltage, energy and power in electric circuits 00094-2008DVD-EN Contents Voltage

  10. ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME

    E-Print Network [OSTI]

    Zachmann, Gabriel

    ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME H. Richter, R.H. Cole the the most important internal states of the control software ASDEX-Upgrade tokamak device for controlled systems. I. INTRODUCTION ASDEX-Upgrade is an experimental plasma physical device of the tokamak type

  11. access circuit design: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Multilayer Ceramic Integrated Circuits (MCICs) Technology and Passive Circuit Design Computer Technologies and Information Sciences Websites Summary: Multilayer Ceramic...

  12. RHIC Operation and Plans for Upgrades Wolfram Fischer

    E-Print Network [OSTI]

    Ã? design 10Ã? achieved #12;Wolfram Fischer 7 Achieved parameters Mode No of bunches Ions/bunch [ 1 0 9] enhanced luminosity 60e9 Au intensity design luminosity Beamexperiments #12;Wolfram Fischer 10 RHIC Run-41 RHIC Operation and Plans for Upgrades Wolfram Fischer C-AD Machine Advisory Committee Meeting 10

  13. Progress in MPC and A upgrades at Luch

    SciTech Connect (OSTI)

    Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

    1997-09-01T23:59:59.000Z

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

  14. Simulation of the TREAT-Upgrade Automatic Reactor Control System

    SciTech Connect (OSTI)

    Lipinski, W.C.; Kirsch, L.W.; Valente, A.D.

    1984-01-01T23:59:59.000Z

    This paper describes the design of the Automatic Reactor Control System (ARCS) for the Transient Reactor Test Facility (TREAT) Upgrade. A simulation was used to facilitate the ARCS design and to completely test and verify its operation before installation at the TREAT facility.

  15. Upgrade LCDs or TVs with improved ergonomic adjustability

    E-Print Network [OSTI]

    Saskatchewan, University of

    Highlights · Upgrade LCDs or TVs with improved ergonomic adjustability · Constant Force (CFTM) patented lift-and-pivot motion technology produces smooth adjustment · Neo-Flex LCD Stand is the only range of movement to your LCD display or TV with the Neo-Flex LCD Stand! This proven technology is now

  16. Installing or Upgrading to the SQL Server 2008

    E-Print Network [OSTI]

    Bernstein, Phil

    CHAPTER 1 Installing or Upgrading to the SQL Server 2008 Database Engine SQL Server 2008 Database Engine Services, formerly referred to as "The Database Engine," is the nucleus of SQL Server 2008. Its that command the use of a feature like SQL Server's Database Engine that can process, store, and secure data

  17. Recent Upgrade of the Klystron Modulator at SLAC

    SciTech Connect (OSTI)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04T23:59:59.000Z

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  18. COUNTY OF SAN DIEGO Energy Upgrade San Diego

    E-Print Network [OSTI]

    homeowners with initiatives; multifamily energy audit program; extended HERS II audit, field verification a multi-family energy audit program, and will extend HERS II audit and field verification and diagnosticCOUNTY OF SAN DIEGO Energy Upgrade San Diego Summary Sheet ARRA EECBG Discretionary Funding

  19. Post Production Heavy Oil Operations: A Case for Partial Upgrading

    E-Print Network [OSTI]

    Lokhandwala, Taher

    2012-12-05T23:59:59.000Z

    tipping off point and with a detailed look at the chemistry of the oil in question it is possible to make a very viable case for visbreaking. In a similar vein, this analysis can serve as a guide in making a case for other partial upgrading methods as well....

  20. CDF Run IIb Silicon Vertex Detector DAQ Upgrade

    SciTech Connect (OSTI)

    S. Behari et al.

    2003-12-18T23:59:59.000Z

    The CDF particle detector operates in the beamline of the Tevatron proton-antiproton collider at Fermilab, Batavia, IL. The Tevatron is expected to undergo luminosity upgrades (Run IIb) in the future, resulting in a higher number of interactions per beam crossing. To operate in this dense radiation environment, an upgrade of CDF's silicon vertex detector (SVX) subsystem and a corresponding upgrade of its VME-based DAQ system has been explored. Prototypes of all the Run IIb SVX DAQ components have been constructed, assembled into a test stand and operated successfully using an adapted version of CDF's network-capable DAQ software. In addition, a PCI-based DAQ system has been developed as a fast and inexpensive tool for silicon detector and DAQ component testing in the production phase. In this paper they present an overview of the Run IIb silicon DAQ upgrade, emphasizing the new features and improvements incorporated into the constituent VME boards, and discuss a PCI-based DAQ system developed to facilitate production tests.

  1. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Guillas, Serge

    decision as the opportunity cost of exercising the investment option increases as well. In this paper, weInvestment and Upgrade in Distributed Generation under Uncertainty Afzal Siddiqui Karl Maribu 13 for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via

  2. Technologies for Upgrading Light Water Reactor Outlet Temperature

    SciTech Connect (OSTI)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01T23:59:59.000Z

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  3. T Plant secondary containment and leak detection upgrades

    SciTech Connect (OSTI)

    Carlson, T.A.

    1995-10-19T23:59:59.000Z

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

  4. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    SciTech Connect (OSTI)

    Brenman, O. [Westinghouse Electric Company, 4350 Northern Pike, Monroeville, PA 15146 (United States); Chernyshov, M. A. [Westron, LLC, 1 Acad. Proskura St., Kharkiv 61070 (Ukraine); Denning, R. S. [Battelle, 505 King Ave, Columbus, OH 43201 (United States); Kolesov, S. A. [NAEK Energoatom, 3 Vetrov Str., Kiev, 01032 (Ukraine); Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I. [PO South Ukraine NPP, NAEK Energoatom, Mylolayv Region, 55000 (Ukraine); Trosman, G. [US Dept. of Energy, International Nuclear Safety Program, Washington, DC 20585 (United States)

    2006-07-01T23:59:59.000Z

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  5. Low rank coal upgrading in a flow of hot water

    SciTech Connect (OSTI)

    Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

    2009-09-15T23:59:59.000Z

    Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

  6. Upgraded coal interest group. Quarterly report, July 1, 1995--September 30, 1995

    SciTech Connect (OSTI)

    Weber, W. [Electric Power Research Inst., Chattanooga, TN (United States); Lebowitz, H.E. [Fossil Fuel Sciences, Palo Alto, CA (United States)

    1995-12-31T23:59:59.000Z

    The objectives of the Upgraded Coal Interest Group (UCIG) are as follows: Review and update the status of various coal upgrading technologies and developments and critically assess the results. Perform engineering screening analyses on various coal upgrading approaches. Perform commercialization analyses that will promote the availability and use of upgraded coal products by quantifying the benefits of using them. Identify market opportunities for introduction of upgraded coals. Perform critical analyses on a variety of coals and technologies in areas important to users but not readily available. Perform critical experiments which will show the differences between technologies.

  7. 1166 IEEE JOURNAL OF SOLID-STATE CIRCUITS, VOL. 40, NO. 5, MAY 2005 Design Analysis and Circuit Enhancements for

    E-Print Network [OSTI]

    Long, Stephen I.

    1166 IEEE JOURNAL OF SOLID-STATE CIRCUITS, VOL. 40, NO. 5, MAY 2005 Design Analysis and Circuit from the layout in an analysis, see [6]. A. Open Circuit Time Constants The method of open circuit time finds exactly the value of for a linear circuit (corre- sponding to the dominant pole in the circuit

  8. Neutrinoless Double Beta Decay

    E-Print Network [OSTI]

    Heinrich Päs; Werner Rodejohann

    2015-07-01T23:59:59.000Z

    We review the potential to probe new physics with neutrinoless double beta decay $(A,Z) \\to (A,Z+2) + 2 e^-$. Both the standard long-range light neutrino mechanism as well as short-range mechanisms mediated by heavy particles are discussed. We also stress aspects of the connection to lepton number violation at colliders and the implications for baryogenesis.

  9. Neutrinoless Double Beta Decay

    E-Print Network [OSTI]

    Päs, Heinrich

    2015-01-01T23:59:59.000Z

    We review the potential to probe new physics with neutrinoless double beta decay $(A,Z) \\to (A,Z+2) + 2 e^-$. Both the standard long-range light neutrino mechanism as well as short-range mechanisms mediated by heavy particles are discussed. We also stress aspects of the connection to lepton number violation at colliders and the implications for baryogenesis.

  10. DOUBLE MAJORS Imaging Science + ...

    E-Print Network [OSTI]

    Zanibbi, Richard

    DOUBLE MAJORS Imaging Science + ... Applied Mathematics Biomedical Sciences Computer Science Undergraduate Research Internships and Cooperative Education (Co-op) (optional) Study Abroad WHY IMAGING SCIENCE Science: BS, MS, PhD Color Science: MS, PhD BS + MS/PhD Combos HUMAN VISION BIO- MEDICAL ASTRO- PHYSICS

  11. Double resonator cantilever accelerometer

    DOE Patents [OSTI]

    Koehler, D.R.

    1982-09-23T23:59:59.000Z

    A digital quartz accelerometer includes a pair of spaced double-ended tuning forks fastened at one end to a base and at the other end through a spacer mass. Transverse movement of the resonator members stresses one and compresses the other, providing a differential frequency output which is indicative of acceleration.

  12. Double resonator cantilever accelerometer

    DOE Patents [OSTI]

    Koehler, Dale R. (Albuquerque, NM)

    1984-01-01T23:59:59.000Z

    A digital quartz accelerometer includes a pair of spaced double-ended tuning forks fastened at one end to a base and at the other end through a spacer mass. Transverse movement of the resonator members stresses one and compresses the other, providing a differential frequency output which is indicative of acceleration.

  13. Neutrinoless double beta decay

    E-Print Network [OSTI]

    Petr Vogel

    2006-11-17T23:59:59.000Z

    The status of the search for neutrinoless double beta decay is reviewed. The effort to reach the sensitivity needed to cover the effective Majorana neutrino mass corresponding to the degenerate and inverted mass hierarchy is described. Various issues concerning the theory (and phenomenology) of the relation between the $0\

  14. Delta connected resonant snubber circuit

    DOE Patents [OSTI]

    Lai, J.S.; Peng, F.Z.; Young, R.W. Sr.; Ott, G.W. Jr.

    1998-01-20T23:59:59.000Z

    A delta connected, resonant snubber-based, soft switching, inverter circuit achieves lossless switching during dc-to-ac power conversion and power conditioning with minimum component count and size. Current is supplied to the resonant snubber branches solely by the dc supply voltage through the main inverter switches and the auxiliary switches. Component count and size are reduced by use of a single semiconductor switch in the resonant snubber branches. Component count is also reduced by maximizing the use of stray capacitances of the main switches as parallel resonant capacitors. Resonance charging and discharging of the parallel capacitances allows lossless, zero voltage switching. In one embodiment, circuit component size and count are minimized while achieving lossless, zero voltage switching within a three-phase inverter. 36 figs.

  15. Ionization tube simmer current circuit

    DOE Patents [OSTI]

    Steinkraus, Jr., Robert F. (Livermore, CA)

    1994-01-01T23:59:59.000Z

    A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current.

  16. Delta connected resonant snubber circuit

    DOE Patents [OSTI]

    Lai, Jih-Sheng (Knoxville, TN); Peng, Fang Zheng (Oak Ridge, TN); Young, Sr., Robert W. (Oak Ridge, TN); Ott, Jr., George W. (Knoxville, TN)

    1998-01-01T23:59:59.000Z

    A delta connected, resonant snubber-based, soft switching, inverter circuit achieves lossless switching during dc-to-ac power conversion and power conditioning with minimum component count and size. Current is supplied to the resonant snubber branches solely by the dc supply voltage through the main inverter switches and the auxiliary switches. Component count and size are reduced by use of a single semiconductor switch in the resonant snubber branches. Component count is also reduced by maximizing the use of stray capacitances of the main switches as parallel resonant capacitors. Resonance charging and discharging of the parallel capacitances allows lossless, zero voltage switching. In one embodiment, circuit component size and count are minimized while achieving lossless, zero voltage switching within a three-phase inverter.

  17. Ionization tube simmer current circuit

    DOE Patents [OSTI]

    Steinkraus, R.F. Jr.

    1994-12-13T23:59:59.000Z

    A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current. 6 figures.

  18. Photoconductive circuit element pulse generator

    DOE Patents [OSTI]

    Rauscher, Christen (Alexandria, VA)

    1989-01-01T23:59:59.000Z

    A pulse generator for characterizing semiconductor devices at millimeter wavelength frequencies where a photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test.

  19. Monolithic readout circuits for RHIC

    SciTech Connect (OSTI)

    O`Connor, P.; Harder, J. [Brookhaven National Laboratory, Upton, NY (United States)

    1991-12-31T23:59:59.000Z

    Several CMOS ASICs have been developed for a proposed RHIC experiment. This paper discusses why ASIC implementation was chosen for certain functions, circuit specifications and the design techniques used to meet them, and results of simulations and early prototypes. By working closely together from an early stage in the planning process, in-house ASIC designers and detector and data acquisition experimenters can achieve optimal use of this important technology.

  20. Counterpulse railgun energy recovery circuit

    DOE Patents [OSTI]

    Honig, Emanuel M. (Los Alamos, NM)

    1986-01-01T23:59:59.000Z

    In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, a counterpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

  1. Overpulse railgun energy recovery circuit

    DOE Patents [OSTI]

    Honig, Emanuel M. (Los Alamos, NM)

    1989-01-01T23:59:59.000Z

    In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, an overpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

  2. Online circuit breaker monitoring system

    E-Print Network [OSTI]

    Djekic, Zarko

    2008-10-10T23:59:59.000Z

    of Department, Costas N. Georghiades December 2007 Major Subject: Electrical Engineering iii ABSTRACT Online Circuit Breaker Monitoring System. (December 2007) Zarko Djekic, B.S., University of Novi Sad, Serbia Chair of Advisory..., this work would not be possible. I would also like to thank the members of my committee, Dr. Chanan Singh, Dr. Sunil Khatri and Dr. William Lively for their advice and patience. Special thanks also go to Center Point Energy personnel Don Sevcik and John...

  3. Online circuit breaker monitoring system

    E-Print Network [OSTI]

    Djekic, Zarko

    2009-05-15T23:59:59.000Z

    of Department, Costas N. Georghiades December 2007 Major Subject: Electrical Engineering iii ABSTRACT Online Circuit Breaker Monitoring System. (December 2007) Zarko Djekic, B.S., University of Novi Sad, Serbia Chair of Advisory..., this work would not be possible. I would also like to thank the members of my committee, Dr. Chanan Singh, Dr. Sunil Khatri and Dr. William Lively for their advice and patience. Special thanks also go to Center Point Energy personnel Don Sevcik and John...

  4. WHY SEARCH FOR DOUBLE BETA DECAY?

    E-Print Network [OSTI]

    Kayser, B.

    2010-01-01T23:59:59.000Z

    the search for neutrinoless double beta decay may prove verySearching for neutrinoless double beta decay is the onlysensitivity of neutrinoless double beta decay. The potential

  5. Double field theory at order ??

    E-Print Network [OSTI]

    Hohm, Olaf

    We investigate ?? corrections of bosonic strings in the framework of double field theory. The previously introduced “doubled ??-geometry” gives ??-deformed gauge transformations arising in the Green-Schwarz anomaly ...

  6. Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2004-07-01T23:59:59.000Z

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench scale. The project is on schedule and on budget. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement. The system has six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration will be initiated in the next fiscal year. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study.

  7. Arch Coal upgrades a classic West Virginia prep plant

    SciTech Connect (OSTI)

    Bethell, P.J.; Waine, C.

    2008-07-15T23:59:59.000Z

    Holden No. 22 coal preparation plant evolves from 1970s 'by zero' technology to modern, efficient fine coal recovery that includes a de-slime dense-media cyclone, compound spiral circuit. 3 figs.

  8. Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

    SciTech Connect (OSTI)

    Drury, Michael A.; Burrill, Andrew B.; Davis, G. Kirk; Hogan, John P.; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joseph; Reece, Charles E.; Reilly, Anthony V.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2012-09-01T23:59:59.000Z

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

  9. Commissioning of helium refrigeration system at JLab for 12 GeV upgrade

    SciTech Connect (OSTI)

    Ganni, Venkatarao [JLAB; Dixon, Kelly D. [JLAB; Knudsen, Peter N. [JLAB; Norton, Robert O. [JLAB; Creel, Jonathan D. [JLAB

    2014-01-01T23:59:59.000Z

    The new 4.5 K refrigerator system added to the Jefferson Lab (JLab) Central Helium Liquefier (CHL) for the 12 GeV upgrade will double its previous capacity. It includes a 4.5 K cold box system and compressor system with associated oil removal and gas management systems. At its maximum capacity condition, this new system supports an additional 238 g/s 30 K 1.16 bar cold compressor return flow, a 15 g/s 4.5 K liquefaction load and a 12.6 kW 35–55 K shield load. Five more design conditions, ranging from liquefaction to refrigeration and a stand-by/reduced load state, were specified for the sizing and selection of its components. The cold box system is comprised of a 300–60 K vertical cold box that incorporates a liquid nitrogen pre-cooler and a 60–4.5 K horizontal cold box housing seven turbines that are configured in four expansion stages including one Joule-Thompson expander. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will briefly review the salient 4.5 K system design features and discuss the recent commissioning results.

  10. Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan

    SciTech Connect (OSTI)

    Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

    2007-07-01T23:59:59.000Z

    Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

  11. Detector and System Developments for LHC Detector Upgrades

    E-Print Network [OSTI]

    Mandelli, Beatrice; Guida, Roberto; Rohne, Ole; Stapnes, Steinar

    2015-05-12T23:59:59.000Z

    The future Large Hadron Collider (LHC) Physics program and the consequent improvement of the LHC accelerator performance set important challenges to all detector systems. This PhD thesis delineates the studies and strategies adopted to improve two different types of detectors: the replacement of precision trackers with ever increasingly performing silicon detectors, and the improvement of large gaseous detector systems by optimizing their gas mixtures and operation modes. Within the LHC tracker upgrade programs, the ATLAS Insertable B-layer (IBL) is the first major upgrade of a silicon-pixel detector. Indeed the overall ATLAS Pixel Detector performance is expected to degrade with the increase of luminosity and the IBL will recover the performance by adding a fourth innermost layer. The IBL Detector makes use of new pixel and front-end electronics technologies as well as a novel thermal management approach and light support and service structures. These innovations required complex developments and Quality Ass...

  12. 2 MW upgrade of the Fermilab Main Injector

    SciTech Connect (OSTI)

    Weiren Chou

    2003-06-04T23:59:59.000Z

    In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

  13. Using EPICS enabled industrial hardware for upgrading control systems

    SciTech Connect (OSTI)

    Bjorkland, Eric A [Los Alamos National Laboratory; Veeramani, Arun [NATIONAL INSTRUMENTS; Debelle, Thierry [NATIONAL INSTRUMENTS

    2009-01-01T23:59:59.000Z

    Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

  14. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31T23:59:59.000Z

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  15. for doubling solar panel

    E-Print Network [OSTI]

    An outline for doubling solar panel efficiency C o l o ra do S c ho o l of M i ne s Ma g a z i ne Take a look at a solar panel on a sunny Colorado day and, if you're like most people, you won't see physics professor and solar energy researcher, who admits to checking out his panels and their energy

  16. Double Beta Decay Experiments

    SciTech Connect (OSTI)

    Nanal, Vandana [Dept. of Nuclear and Atomic Physics, Tata Institute of Fundamental Research, Mumbai 400 005 (India)

    2011-11-23T23:59:59.000Z

    At present, neutrinoless double beta decay is perhaps the only experiment that can tell us whether the neutrino is a Dirac or a Majorana particle. Given the significance of the 0{nu}{beta}{beta}, there is a widespread interest for these rare event studies employing a variety of novel techniques. This paper describes the current status of DBD experiments. The Indian effort for an underground NDBD experiment at the upcoming INO laboratory is also presented.

  17. ALT-II armor tile design for upgraded TEXTOR operation

    SciTech Connect (OSTI)

    Newberry, B.L. [Univ. of Michigan, Ann Arbor, MI (United States); McGrath, R.T.; Watson, R.D. [Sandia National Labs., Albuquerque, NM (United States); Kohlhaas, W.; Finken, K.H. [Kernforschungsanlage Juelich GmbH (Germany). Inst. fuer Plasmaphysik; Noda, N. [National Inst. for Fusion Science, Nagoya (Japan)

    1994-08-01T23:59:59.000Z

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated.

  18. Slum upgrading in India and Kenya: investigating the sustainability

    E-Print Network [OSTI]

    Cronin, Victoria Louise Molly

    2012-04-10T23:59:59.000Z

    I – Government of India HUDCO – Housing and Urban Development Corporation Limited IoG – Institute of Governance JNNURM – Jawaharlal Nehru National Urban Renewal Mission KP – Kamgar Putla LDCs – Least Developed Countries MASHAL – Maharashtra Area Social... -up approaches. The case studies are of varying ages and were implemented via partnerships with differing agents including government, NGO, CBO, private developer and donors. The influence and design of the delivery model upon the upgrading sustainability...

  19. Plasma diagnostics for the DIII-D divertor upgrade

    SciTech Connect (OSTI)

    Hill, D.N.; Futch, A. (Lawrence Livermore National Lab., CA (USA)); Buchenauer, D. (Sandia National Labs., Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (California Univ., Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Lab., TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (San

    1990-10-01T23:59:59.000Z

    The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this Advanced Divertor Program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high resolution spectrometer. 9 refs.

  20. CRYOGENIC FACITLITY DESIGN IN BEPC II SUPERCONDUCTING UPGRADE.

    SciTech Connect (OSTI)

    JIA,L.X.; WANG,L.; YANG,G.D.; ET AL.

    2004-05-11T23:59:59.000Z

    Three kinds of superconducting device are to be constructed at interaction regions in the upgrade of Beijing Electron-Positron Collider (BEPCII). Two sets of refrigerators with each capacity of 500W at 4.5K are adopted to provide the refrigeration for them. The cryogenic systems to support the operation of the superconducting facilities are under design by Harbin Institute of Technology in China. This paper presents the current design of main cryogenic facilities.

  1. Chapter 2: Machine Design, Fueling, and Heating in ASDEX Upgrade

    SciTech Connect (OSTI)

    Streibl, Bernhard; Lang, Peter Thomas; Leuterer, Fritz; Noterdaeme, Jean-Marie; Staebler, Albrecht [Max-Planck-Institut fuer Plasmaphysik (Germany)

    2003-11-15T23:59:59.000Z

    The machine design, power supply, and machine protection, as well as the different heating systems installed at ASDEX Upgrade are discussed. The available auxiliary heating power of 30 MW, supplied by three different heating systems, allows the power deposition to be varied and species heated over a large range. These three heating systems - neutral beam, ion cyclotron, and electron cyclotron heating - are presented in detail. A description of the pellet refueling system is included, which is successfully used for density control.

  2. Snowflake divertor configuration studies for NSTX-Upgrade

    SciTech Connect (OSTI)

    Soukhanovskii, V A

    2011-11-12T23:59:59.000Z

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  3. Resolution studies and performance evaluation of the LHCb VELO upgrade

    E-Print Network [OSTI]

    Hynds, Daniel Peter McFarlane; Soler, Paul; Parkes, Christopher

    2015-03-25T23:59:59.000Z

    The LHCb detector at CERN is scheduled to undergo an upgrade during the second long shutdown of the LHC. As part of this upgrade, the vertex detector (VELO) will be replaced with a new hybrid pixel detector, based on an evolution of the Timepix ASIC. The performance of this detector should improve upon that achieved by the current VELO, in addition to facilitating the complete detector readout at 40 MHz. As part of the preparation for this upgrade, this thesis presents the results of studies carried out on the single hit resolution of silicon hybrid pixel detectors. The development of a particle beam telescope has been carried out to allow these studies, shown to operate with track rates in excess of 45 kHz and with a pointing resolution at the device under test of less than 2 ?m. A wide range of sensor types, thicknesses and resistivities have then been tested under different operating conditions and the results presented, with single hit resolutions varying between 4 ?m and 12 ?m depending on the conditi...

  4. Upgrading of raw oil into advanced fuel. Task 5

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    The overall objective of the research effort is the determination of the minimum processing requirements to produce high energy density fuels (HEDF) having acceptable fuel specifications. The program encompasses assessing current technology capability; selecting acceptable processing and refining schemes; and generating samples of advanced test fuels. The Phase I Baseline Program is intended to explore the processing alternatives for producing advanced HEDF from two raw synfuel feedstocks, one from Mild Coal Gasification as exemplified by the COALITE process and one from Colorado shale oil. Eight key tasks have been identified as follows: (1) Planning and Environmental Permitting; (2) Transporting and Storage of Raw Fuel Sources and Products; (3) Screening of Processing and Upgrading Schemes; (4) Proposed Upgrading Schemes for Advanced Fuel; (5) Upgrading of Raw Oil into Advanced Fuel (6) Packaging and Shipment of Advanced Fuels; (7) Updated Technical and Economic Assessment; and, (8) Final Report of Phase I Efforts. This topical report summarizes the operations and results of the Phase I Task 5 sample preparation program. The specific objectives of Task 5 were to: Perform laboratory characterization tests on the raw COALITE feed, the intermediate liquids to the required hydroprocessing units and final advanced fuels and byproducts; and produce a minimum of 25-gal of Category I test fuel for evaluation by DOE and its contractors.

  5. Monitoring transients in low inductance circuits

    DOE Patents [OSTI]

    Guilford, R.P.; Rosborough, J.R.

    1985-10-21T23:59:59.000Z

    The instant invention relates to methods of and apparatus for monitoring transients in low inductance circuits and to a probe utilized to practice said method and apparatus. More particularly, the instant invention relates to methods of and apparatus for monitoring low inductance circuits, wherein the low inductance circuits include a pair of flat cable transmission lines. The instant invention is further directed to a probe for use in monitoring pairs of flat cable transmission lines.

  6. An experimental study of some ferroresonant circuits

    E-Print Network [OSTI]

    Rose, Price Duane

    1959-01-01T23:59:59.000Z

    many helpful suggestions during the course of this work. CONTENTS Pa'ge PART I ? GENERAL Introduction Circuit Arrangements Studied Method of Approach PART II SERIES FERRORESONANT CIRCUITS Reaction to Variation of Source Voltage Effect of Non...-linear Resistance Reaction to Variation of Switch-Closing Time 13 Method Used to Close the Switch 13 Experimental Results 19 Effect of Residual Magnetism 22 PART III ? SERIES-PARALLEL FERRORESONANT CIRCUITS Reaction to Variation of Source Voltage 30 Reaction...

  7. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27T23:59:59.000Z

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  8. Polysilicon photoconductor for integrated circuits

    DOE Patents [OSTI]

    Hammond, R.B.; Bowman, D.R.

    1989-04-11T23:59:59.000Z

    A photoconductive element of polycrystalline silicon is provided with intrinsic response time which does not limit overall circuit response. An undoped polycrystalline silicon layer is deposited by LPCVD to a selected thickness on silicon dioxide. The deposited polycrystalline silicon is then annealed at a selected temperature and for a time effective to obtain crystal sizes effective to produce an enhanced current output. The annealed polycrystalline layer is subsequently exposed and damaged by ion implantation to a damage factor effective to obtain a fast photoconductive response. 6 figs.

  9. Circuit analysis of quantum measurement

    E-Print Network [OSTI]

    Yuji Kurotani; Masahito Ueda

    2006-09-08T23:59:59.000Z

    We develop a circuit theory that enables us to analyze quantum measurements on a two-level system and on a continuous-variable system on an equal footing. As a measurement scheme applicable to both systems, we discuss a swapping state measurement which exchanges quantum states between the system and the measuring apparatus before the apparatus meter is read out. This swapping state measurement has an advantage in gravitational-wave detection over contractive state measurement in that the postmeasurement state of the system can be set to a prescribed one, regardless of the outcome of the measurement.

  10. Hybrid stretchable circuits on silicone substrate

    SciTech Connect (OSTI)

    Robinson, A., E-mail: adam.1.robinson@nokia.com; Aziz, A., E-mail: a.aziz1@lancaster.ac.uk [Nanoscience Centre, University of Cambridge, Cambridge CB01FF (United Kingdom); Liu, Q.; Suo, Z. [School of Engineering and Applied Sciences and Kavli Institute for Bionano Science and Technology, Harvard University, Cambridge, Massachusetts 02138 (United States); Lacour, S. P., E-mail: stephanie.lacour@epfl.ch [Centre for Neuroprosthetics and Laboratory for Soft Bioelectronics Interfaces, School of Engineering, Ecole Polytechnique Fédérale de Lausanne, Lausanne 1015 (Switzerland)

    2014-04-14T23:59:59.000Z

    When rigid and stretchable components are integrated onto a single elastic carrier substrate, large strain heterogeneities appear in the vicinity of the deformable-non-deformable interfaces. In this paper, we report on a generic approach to manufacture hybrid stretchable circuits where commercial electronic components can be mounted on a stretchable circuit board. Similar to printed circuit board development, the components are electrically bonded on the elastic substrate and interconnected with stretchable electrical traces. The substrate—a silicone matrix carrying concentric rigid disks—ensures both the circuit elasticity and the mechanical integrity of the most fragile materials.

  11. Step Response of an RLC Circuit ECE 2100 Circuit Analysis Laboratory

    E-Print Network [OSTI]

    Miller, Damon A.

    Step Response of an RLC Circuit ECE 2100 Circuit Analysis Laboratory updated 8 January 2008 Pre of a function generator. As in the RC step response lab, this voltage source will be used to apply a voltage step to the RLC circuit. 1. Find , 0, d, and vC(t) for R1=750, 2450, and 3550. Use a table to present

  12. Double Beta Decay

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract ManagementDiscovering HowAna Moore Anne Jones DevensforDouble Beta

  13. ENGR 201 Electrical Fundamentals I Catalog Description: Analysis of linear circuits. Circuit laws and theorems. DC response of

    E-Print Network [OSTI]

    ENGR 201 ­ Electrical Fundamentals I Catalog Description: Analysis of linear circuits. Circuit laws and laws · Methods of analysis (e.g., nodal, mesh) · Circuit theorems · Operational amplifiers · Capacitors, and apply these for the analysis of dc circuits (ABET outcomes: A, e, m) 4. Analyze circuits made up

  14. ELECTRONICS UPGRADE TO THE SAVANNAH RIVER NATIONAL LABORATORY COULOMETER FOR PLUTONIUM AND NEPTUNIUM ASSAY

    SciTech Connect (OSTI)

    Cordaro, J.; Holland, M.; Reeves, G.; Nichols, S.; Kruzner, A.

    2011-07-08T23:59:59.000Z

    The Savannah River Site (SRS) has the analytical measurement capability to perform high-precision plutonium concentration measurements by controlled-potential coulometry. State-of-the-art controlled-potential coulometers were designed and fabricated by the Savannah River National Laboratory and installed in the Analytical Laboratories process control laboratory. The Analytical Laboratories uses coulometry for routine accountability measurements of and for verification of standard preparations used to calibrate other plutonium measurement systems routinely applied to process control, nuclear safety, and other accountability applications. The SRNL Coulometer has a demonstrated measurement reliability of {approx}0.05% for 10 mg samples. The system has also been applied to the characterization of neptunium standard solutions with a comparable reliability. The SRNL coulometer features: a patented current integration system; continuous electrical calibration versus Faraday's Constants and Ohm's Law; the control-potential adjustment technique for enhanced application of the Nernst Equation; a wide operating room temperature range; and a fully automated instrument control and data acquisition capability. Systems have been supplied to the International Atomic Energy Agency (IAEA), Russia, Japanese Atomic Energy Agency (JAEA) and the New Brunswick Laboratory (NBL). The most recent vintage of electronics was based on early 1990's integrated circuits. Many of the components are no longer available. At the request of the IAEA and the Department of State, SRNL has completed an electronics upgrade of their controlled-potential coulometer design. Three systems have built with the new design, one for the IAEA which was installed at SAL in May 2011, one system for Los Alamos National Laboratory, (LANL) and one for the SRS Analytical Laboratory. The LANL and SRS systems are undergoing startup testing with installation scheduled for this summer.

  15. asdex upgrade h-mode: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 5 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

  16. Project X ICD-2 and its upgrades for Neutrino Factory or Muon Collider

    SciTech Connect (OSTI)

    Lebedev, Valeri; Nagaitsev, Sergei; /Fermilab

    2009-10-01T23:59:59.000Z

    This paper reviews the Initial Configuration Document for Fermilab's Project X and considers its possible upgrades for neutrino factory or muon collider.

  17. Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole...

  18. Microsoft Word - CX-DrainageUpgradesMultipleSubsFY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: FY13 Environmental Drainage Upgrades at Bonneville...

  19. Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    January 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment...

  20. Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    24, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at...

  1. Microsoft Word - CX-WallaWalla-Pendleton-Upgrade_FY14_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Line upgrade on Bonneville Power...

  2. Entropy production by simple electrical circuits

    E-Print Network [OSTI]

    E. N. Miranda; S. Nikolskaia

    2012-08-13T23:59:59.000Z

    The entropy production by simple electrical circuits (R, RC, RL) is analyzed. It comes out that the entropy production is minimal, in agreement with a well known theorem due to Prigogine. In this way, it is wrong a recent result by Zupanovic, Juretic and Botric (Physica Review E 70, 056198) who claimed that the entropy production in simple electrical circuits is a maximum

  3. The Design of Integrated Circuits to Observe

    E-Print Network [OSTI]

    Harrison, Reid R.

    -limited application. KEYWORDS | Amplifiers; analog integrated circuits; biomedical signal processing; low must have its own dedicated low-noise amplifier. Although it is tempting to imagine using an analog revealed significant circuit design chal- lenges. Weak neural signals must be amplified and filtered using

  4. LABORATORY II ENERGY AND ELECTRIC CIRCUITS

    E-Print Network [OSTI]

    Minnesota, University of

    LABORATORY II ENERGY AND ELECTRIC CIRCUITS Lab II - 1 It is often useful to study physical. An electric circuit illustrates how energy can be transformed within a system, transferred to different parts it is the electric charge that transports the energy from one place in the system to another

  5. Beam Position Monitor Electronics Upgrade for Fermilab Switchyard

    E-Print Network [OSTI]

    Stabile, P; Fitzgerald, J A; Liu, N; Morris, D K; Prieto, P S; Seraphin, J P

    2015-01-01T23:59:59.000Z

    The beam position monitor (BPM) system for Fermilab Switchyard (SY) provides the position, intensity and integrated intensity of the 53.10348 MHz RF bunched resonant extracted beam from the Main Injector over 4 seconds of spill. The total beam intensity varies from 1x10^11 to 1x10^13 protons. The spill is measured by stripline beam postion monitors and resonant circuit. The BPMs have an external resonant circuit tuned to 53.10348 MHz. The corresponding voltage signal out of the BPM has been estimated to be between -110 dBm and -80 dBm.

  6. Reusable vibration resistant integrated circuit mounting socket

    DOE Patents [OSTI]

    Evans, Craig N. (Irwin, PA)

    1995-01-01T23:59:59.000Z

    This invention discloses a novel form of socket for integrated circuits to be mounted on printed circuit boards. The socket uses a novel contact which is fabricated out of a bimetallic strip with a shape which makes the end of the strip move laterally as temperature changes. The end of the strip forms a barb which digs into an integrated circuit lead at normal temperatures and holds it firmly in the contact, preventing loosening and open circuits from vibration. By cooling the contact containing the bimetallic strip the barb end can be made to release so that the integrated circuit lead can be removed from the socket without damage either to the lead or to the socket components.

  7. Triple-effect absorption refrigeration system with double-condenser coupling

    DOE Patents [OSTI]

    DeVault, R.C.; Biermann, W.J.

    1993-04-27T23:59:59.000Z

    A triple effect absorption refrigeration system is provided with a double-condenser coupling and a parallel or series circuit for feeding the refrigerant-containing absorbent solution through the high, medium, and low temperature generators utilized in the triple-effect system. The high temperature condenser receiving vaporous refrigerant from the high temperature generator is double coupled to both the medium temperature generator and the low temperature generator to enhance the internal recovery of heat within the system and thereby increase the thermal efficiency thereof.

  8. Triple-effect absorption refrigeration system with double-condenser coupling

    DOE Patents [OSTI]

    DeVault, Robert C. (Knoxville, TN); Biermann, Wendell J. (Fayetteville, NY)

    1993-01-01T23:59:59.000Z

    A triple effect absorption refrigeration system is provided with a double-condenser coupling and a parallel or series circuit for feeding the refrigerant-containing absorbent solution through the high, medium, and low temperature generators utilized in the triple-effect system. The high temperature condenser receiving vaporous refrigerant from the high temperature generator is double coupled to both the medium temperature generator and the low temperature generator to enhance the internal recovery of heat within the system and thereby increase the thermal efficiency thereof.

  9. Sequential power-up circuit

    DOE Patents [OSTI]

    Kronberg, J.W.

    1992-06-02T23:59:59.000Z

    A sequential power-up circuit for starting several electrical load elements in series to avoid excessive current surge, comprising a voltage ramp generator and a set of voltage comparators, each comparator having a different reference voltage and interfacing with a switch that is capable of turning on one of the load elements. As the voltage rises, it passes the reference voltages one at a time and causes the switch corresponding to that voltage to turn on its load element. The ramp is turned on and off by a single switch or by a logic-level electrical signal. The ramp rate for turning on the load element is relatively slow and the rate for turning the elements off is relatively fast. Optionally, the duration of each interval of time between the turning on of the load elements is programmable. 2 figs.

  10. PERFORMANCE OF AND UPGRADES TO THE SNS COLLIMATOR SYSTEMS

    SciTech Connect (OSTI)

    Plum, Michael A [ORNL; Abdou, Ashraf A [ORNL; Jacobs, Lorelei L [ORNL; Janney, Jim G [ORNL; Geoghegan, Patrick J [ORNL; McTeer, Stephen Mark [ORNL; Popova, Irina [ORNL; Ferguson, Phillip D [ORNL; Zhukov, Alexander P [ORNL

    2009-01-01T23:59:59.000Z

    As the Spallation Neutron Source (SNS) beam power is increased, the collimator systems are becoming correspondingly more important. The High Energy Beam Transport (HEBT) transverse collimators are now routinely used during neutron production. We are in the process of redesigning the HEBT momentum collimation system due to problems with gas production from radiolysis. The Ring collimators are designed for two-stage operation but to date they are mainly used in one-stage mode. In this paper we will discuss the status, the operational performance, and upgrades to the collimation systems.

  11. Searches for Higgs Boson(s) at the Upgraded Tevatron

    E-Print Network [OSTI]

    Gregorio Bernardi; for the CDF; D0 collaborations

    2005-07-14T23:59:59.000Z

    We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the DO and CDF collaborations. We report on three categories of searches, namely 1) the search for the Standard Model Higgs boson (p\\bar{p} --> H, WH or ZH, with H --> WW* and/or H --> b\\bar{b}), 2) the search for the minimal supersymmetric Higgs boson using p\\bar{p} --> hb\\bar{b} --> b\\bar{b}b\\bar{b} and p\\bar{p} --> hX --> tau tau X, 3) the search for doubly charged Higgs boson.

  12. Network Upgrade for the SLC: Control System Modifications

    SciTech Connect (OSTI)

    Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

    2011-09-09T23:59:59.000Z

    Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

  13. Physics at an upgraded proton driver at Fermilab

    SciTech Connect (OSTI)

    Steve Geer

    2004-07-28T23:59:59.000Z

    The accelerator-based particle physics program in the US is entering a period of transition. This is particularly true at Fermilab which for more than two decades has been the home of the Tevatron Proton-Antiproton Collider, the World's highest energy hadron collider. In a few years time the energy frontier will move to the LHC at CERN. Hence, if an accelerator-based program is to survive at Fermilab, it must evolve. Fermilab is fortunate in that, in addition to hosting the Tevatron Collider, the laboratory also hosts the US accelerator-based neutrino program. The recent discovery that neutrino flavors oscillate has opened a new exciting world for us to explore, and has created an opportunity for the Fermilab accelerator complex to continue to address the cutting-edge questions of particle physics beyond the Tevatron Collider era. The presently foreseen neutrino oscillation experiments at Fermilab (MiniBooNE [1] and MINOS [2]) will enable the laboratory to begin contributing to the Global oscillation physics program in the near future, and will help us better understand the basic parameters describing the oscillations. However, this is only a first step. To be able to pin down all of the oscillation parameters, and hopefully make new discoveries along the way, we will need high statistics experiments, which will require a very intense neutrino beam, and one or more very massive detectors. In particular we will require new MW-scale primary proton beams and perhaps ultimately a Neutrino Factory [3]. Plans to upgrade the Fermilab Proton Driver are presently being developed [4]. The upgrade project would replace the Fermilab Booster with a new 8 GeV accelerator with 0.5-2 MW beam power, a factor of 15-60 more than the current Booster. It would also make the modifications needed to the Fermilab Main Injector (MI) to upgrade it to simultaneously provide 120 GeV beams of 2 MW. This would enable a factor of 5-10 increase in neutrino beam intensities at the MI, while also supporting a vigorous 8 GeV fixed-target program. In addition, a Proton Driver might also serve as a stepping-stone to future accelerators, both as an R&D test bed and as an injector, with connections to the Linear Collider, Neutrino Factories, and a VLHC. Hence, although neutrino physics would provide the main thrust for the science program at an upgraded Fermilab proton source, the new facility would also offer exciting opportunities for other fixed-target particle physics (kaons, muons, neutrons, antiprotons, etc.) and a path towards new accelerators in the future.

  14. Better Buildings Neighborhood Program Data Upgrade Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergy Christopher|for ConsumersDashboardEnergy Upgrade

  15. Upgrade Boilers with Energy-Efficient Burners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and03/02 TUE 08:59 FAX 423DepartmentUpgrade Boilers with

  16. active snubber circuit: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Circuits Engineering Websites Summary: Transition Density, A New Measure of Activity in Digital Circuits Farid N. Najm Semiconductor Process & Design Center Texas Instruments...

  17. atmospheric electric circuit: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Berkeley, California of a satisfactory circuit. The topology comprises the gross number of components in the circuit, the type of each Fernandez, Thomas 59 ENG 2MM3...

  18. atmospheric electrical circuit: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Berkeley, California of a satisfactory circuit. The topology comprises the gross number of components in the circuit, the type of each Fernandez, Thomas 59 ENG 2MM3...

  19. Buford Major Rehabilitation Study (1996) and 11th Circuit Hydropower...

    Office of Environmental Management (EM)

    Buford Major Rehabilitation Study (1996) and 11th Circuit Hydropower Report (June 2012) Comparison The rehab study is compared to the 11th Circuit Hydropower Report for capacity...

  20. Neutrinoless Double Phys 135c Spring 2007

    E-Print Network [OSTI]

    Golwala, Sunil

    Neutrinoless Double Beta Decay Phys 135c Spring 2007 Michael Mendenhall #12;Theory Overview #12 beta decays #12;neutrinoless double beta decays n e- p beta decay e #12;neutrinoless double beta decays n e- p beta decay e n e- p n e- p double beta decay e e #12;neutrinoless double beta decays n e- p

  1. Analysis of NSTX Upgrade OH Magnet and Center Stack

    SciTech Connect (OSTI)

    A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

    2010-11-30T23:59:59.000Z

    The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

  2. ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK

    SciTech Connect (OSTI)

    AUSTIN, ME; LOHR, J

    2002-08-01T23:59:59.000Z

    OAK A271 ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK. The electron cyclotron emission (ECE) heterodyne radiometer diagnostic on DIII-D has been upgraded with the addition of eight channels for a total of 40. The new, higher frequency channels allow measurements of electron temperature into the magnetic axis in discharges at maximum field, 2.15 T. The complete set now extends over the full usable range of second harmonic emission frequencies at 2.0 T covering radii from the outer edge inward to the location of third harmonic overlap on the high field side. Full coverage permits the measurement of heat pulses and magnetohydrodynamic (MHD) fluctuations on both sides of the magnetic axis. In addition, the symmetric measurements are used to fix the location of the magnetic axis in tokamak magnetic equilibrium reconstructions. Also, the new higher frequency channels have been used to determine central T{sub e} with good time resolution in low field, high density discharges using third harmonic ECE in the optically gray and optically thick regimes.

  3. RF Power Upgrade for CEBAF at Jefferson Laboratory

    SciTech Connect (OSTI)

    Andrew Kimber,Richard Nelson

    2011-03-01T23:59:59.000Z

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  4. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    SciTech Connect (OSTI)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01T23:59:59.000Z

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

  5. Fischer-Tropsch wax characterization and upgrading: Final report

    SciTech Connect (OSTI)

    Shah, P.P.; Sturtevant, G.C.; Gregor, J.H.; Humbach, M.J.; Padrta, F.G.; Steigleder, K.Z.

    1988-06-06T23:59:59.000Z

    The characterization and upgrading of Fischer-Tropsch wax was studied. The focus of the program was to maximize the yield of marketable transportation fuels from the Fischer-Tropsch process. The wax was characterized using gel permeation chromatography (GPC), high resolution mass spectrometry (HRMS), infrared spectroscopy (IR), gas chromatography (GC), nuclear magnetic resonance (NMR) and various other physical analyses. Hydrocracking studies conducted in a pilot plant indicate that Fischer-Tropsch wax is an excellent feedstock. A high yield of excellent quality diesel fuel was produced with satisfactory catalyst performance at relatively mild operating conditions. Correlations for predicting key diesel fuel properties were developed and checked against actual laboratory blend data. The blending study was incorporated into an economic evaluation. Finally, it is possible to take advantage of the high quality of the Fischer-Tropsch derived distillate by blending a lower value light cycle oil (produced from a refinery FCC unit) representing a high aromatic and low cetane number. The blended stream meets diesel pool specifications (up to 60 wt % LCO addition). The value added to this blending stream further enhances the upgrading complex return. 22 refs., 39 figs., 48 tabs.

  6. Catalyst poisoning during tar-sands bitumen upgrading

    SciTech Connect (OSTI)

    Carruthers, J.D.; Brinen, J.S.; Komar, D.A.; Greenhouse, S. [CYTEC Industries, Stamford, CT (United States)

    1994-12-31T23:59:59.000Z

    A number of hydrotreating catalysts are used in commercial heavy oil upgrading facilities. One of these, a CoO/MoO{sub 3}/Al{sub 2}O{sub 3} catalyst has been evaluated in a pilot plant CSTR for Tar-Sands Bitumen upgrading. Following its use in a test of 200 hours duration, the catalyst was removed, de-oiled, regenerated by air-calcination to remove the coke, and then re-tested. Samples of the coked, fresh and regenerated catalyst were each examined using surface analytical techniques. ESCA and SIMS analysis of the coked and regenerated catalyst samples show, as expected, significant contamination of the catalyst with Ni and V. In addition, the SIMS analysis clearly reveals that the edges of the catalyst pellets are rich in Ca, Mg and Fe while the Ni, V and coke are evenly distributed. Regeneration of the catalyst by calcination removes the carbonaceous material but appears not to change the distribution of the metal contaminants. Retesting of the regenerated catalyst shows a performance similar to that of the fresh catalyst. These data serve to support the view that catalyst deactivation during early use is not due to the skin of Ca and Mg on the pellets but rather via the poisoning of active sites by carbonaceous species.

  7. Upgrade of the electron beam ion trap in Shanghai

    SciTech Connect (OSTI)

    Lu, D.; Yang, Y.; Xiao, J.; Shen, Y.; Fu, Y.; Wei, B.; Yao, K.; Hutton, R.; Zou, Y., E-mail: zouym@fudan.edu.cn [The Key Lab of Applied Ion Beam Physics, Ministry of Education, 200433 Shanghai (China); Shanghai EBIT Lab, Institute of Modern Physics, Fudan University, 200433 Shanghai (China)

    2014-09-15T23:59:59.000Z

    Over the last few years the Shanghai electron beam ion trap (EBIT) has been successfully redesigned and rebuilt. The original machine, developed under collaboration with the Shanghai Institute of Applied Physics, first produced an electron beam in 2005. It could be tuned with electron energies between 1 and 130 keV and beam current up to 160 mA. After several years of operation, it was found that several modifications for improvements were necessary to reach the goals of better electron optics, higher photon detection, and ion injection efficiencies, and more economical running costs. The upgraded Shanghai-EBIT is made almost entirely from Ti instead of stainless steel and achieves a vacuum of less than 10{sup ?10} Torr, which helps to minimize the loss of highly changed ions through charge exchange. Meanwhile, a more compact structure and efficient cryogenic system, and excellent optical alignment have been of satisfactory. The magnetic field in the central trap region can reach up till 4.8 T with a uniformity of 2.77 × 10{sup ?4}. So far the upgraded Shanghai-EBIT has been operated up to an electron energy of 151 keV and a beam current of up to 218 mA, although promotion to even higher energy is still in progress. Radiation from ions as highly charged as Xe{sup 53+,} {sup 54+} has been produced and the characterization of current density is estimated from the measured electron beam width.

  8. The 400 MeV Linac Upgrade at Fermilab

    SciTech Connect (OSTI)

    Noble, R.J.

    1992-12-01T23:59:59.000Z

    The Fermilab Linac Upgrade in planned to increase the energy of the H{sup {minus}} linac from 200 to 400 MeV. This is intended to reduce the incoherent space-charge tuneshift at injection into the 8 GeV Booster which limit either the brightness or the total intensity of the beam. The Linac Upgrade will be achieved by replacing the last four 201.25 MHs drift-tube linac (DTL) tanks which accelerate the beam from 116 to 200 MeV, with seven 805 MRs side-coupled cavity modules operating at an average axial field of about 7.5 MV/meter. This will allow acceleration to 400 MeV in the existing Linac enclosure. Each accelerator module will be driven with a 12 MW klystron-based rf power supply. Three of seven accelerator modules have been fabricated, power tested and installed in their temporary location adjacent to the existing DTL. All seven RF Modulators have been completed and klystron installation has begun. Waveguide runs have completed from the power supply gallery to the accelerator modules. The new linac will be powered in the temporary position without beam in order to verify overall system reliability until the laboratory operating schedule permits final conversion to 400 MeV operation.

  9. Post Retort, Pre Hydro-treat Upgrading of Shale Oil

    SciTech Connect (OSTI)

    Gordon, John

    2012-09-30T23:59:59.000Z

    Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

  10. Pellet-Plasma Interaction Studies at ASDEX Upgrade

    SciTech Connect (OSTI)

    Kocsis, G.; Belonohy, E.; Gal, K.; Kalvin, S.; Veres, G. [KFKI-RMKI, EURATOM Association, P.O.Box 49, H-1525 Budapest-114 (Hungary); Lang, P. T.; Schneider, W. [MPI fuer Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2006-01-15T23:59:59.000Z

    Pellet-plasma interaction is investigated both experimentally at ASDEX Upgrade tokamak and theoretically based on the obtained experimental data. For ELM triggering pellets were injected from the high field side at the ASDEX Upgrade tokamak into type-I ELMy H-mode plasma with a frequency much smaller than the natural ELM frequency. Every pellet triggered an ELM. In order to gain information about the triggering mechanism the delay between the time the pellet crossing the separatrix and the ELM onset was investigated by injecting pellets with two different velocities (240m/s, 600m/s). It was found that the delay time is in the order of 100{mu}s and is shorter at higher pellet velocity. Pellets trigger ELMs when only a minor part the mass is ablated in the plasma: about 2 {center_dot} 1018 (vp 240m/s) and 8 {center_dot} 1017 (vp = 600m/s) particles are deposited along the pellet path until the ELM onset is detected.

  11. Efficient quantum circuits for arbitrary sparse unitaries

    SciTech Connect (OSTI)

    Jordan, Stephen P. [Institute for Quantum Information, Caltech, Pasadena, California 91125 (United States); Wocjan, Pawel [School of Electrical Engineering and Computer Science, University of Central Florida, Orlando, Florida 32816 (United States)

    2009-12-15T23:59:59.000Z

    Arbitrary exponentially large unitaries cannot be implemented efficiently by quantum circuits. However, we show that quantum circuits can efficiently implement any unitary provided it has at most polynomially many nonzero entries in any row or column, and these entries are efficiently computable. One can formulate a model of computation based on the composition of sparse unitaries which includes the quantum Turing machine model, the quantum circuit model, anyonic models, permutational quantum computation, and discrete time quantum walks as special cases. Thus, we obtain a simple unified proof that these models are all contained in BQP. Furthermore, our general method for implementing sparse unitaries simplifies several existing quantum algorithms.

  12. Overload protection circuit for output driver

    DOE Patents [OSTI]

    Stewart, Roger G. (Neshanic Station, NJ)

    1982-05-11T23:59:59.000Z

    A protection circuit for preventing excessive power dissipation in an output transistor whose conduction path is connected between a power terminal and an output terminal. The protection circuit includes means for sensing the application of a turn on signal to the output transistor and the voltage at the output terminal. When the turn on signal is maintained for a period of time greater than a given period without the voltage at the output terminal reaching a predetermined value, the protection circuit decreases the turn on signal to, and the current conduction through, the output transistor.

  13. Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion

    E-Print Network [OSTI]

    Huseynzade, Samir

    2009-05-15T23:59:59.000Z

    In-situ upgrading of oil using hydrogen donors is a new process. In particular, very little research has been conducted with respect to in-situ oil upgrading using hydrogen donor under in-situ combustion. Several papers describe the use of metal...

  14. Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion

    E-Print Network [OSTI]

    Huseynzade, Samir

    2008-10-10T23:59:59.000Z

    UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A... UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A Thesis by SAMIR HUSEYNZADE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

  15. DEVELOPMENT AND TESTING OF A PROTOTYPE TUNER FOR THE CEBAF UPGRADE CRYOMODULE*

    E-Print Network [OSTI]

    DEVELOPMENT AND TESTING OF A PROTOTYPE TUNER FOR THE CEBAF UPGRADE CRYOMODULE* G. Davis , J developed for CEBAF at Jefferson Lab. The high-gradient, low-current operation of the superconductingHz and resolution of 1Hz that will be used during normal operation [1]. Fig. 1: CEBAF Upgrade Tuner 2 MECHANICAL

  16. CRYOGENIC TESTING OF THE RF INPUT WAVEGUIDE FOR THE CEBAF UPGRADE CRYOMODULE*

    E-Print Network [OSTI]

    CRYOGENIC TESTING OF THE RF INPUT WAVEGUIDE FOR THE CEBAF UPGRADE CRYOMODULE* T. Hiatt , M. Breth to support the planned CEBAF upgrade at the Jefferson Lab a new cryomodule has been designed. A key component original CEBAF waveguides. A series of tests were performed on the waveguide to include temperature

  17. CEBAF UPGRADE CRYOMODULE COMPONENT TESTING IN THE HORIZONTAL TEST BED (HTB)*

    E-Print Network [OSTI]

    CEBAF UPGRADE CRYOMODULE COMPONENT TESTING IN THE HORIZONTAL TEST BED (HTB)* I. E. Campisi , B The planned upgrade of the CEBAF electron accelerator includes the development of an improved cryomodule. Several components differ substantially from the original CEBAF cryomodule; these include: the new 7-cell

  18. Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating

    E-Print Network [OSTI]

    Cui, Yi

    Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating, Stanford, California 94305, United States *S Supporting Information ABSTRACT: Heavy crude oil can that by using carbon nano- catalysts, heavy crude oil can be efficiently upgraded to lighter oil at a relatively

  19. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    SciTech Connect (OSTI)

    Jacobson, R.W.

    1997-04-01T23:59:59.000Z

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers.

  20. An e-Learning Platform for SME Manager Upgrade and its Evolution Toward a Distributed

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    An e-Learning Platform for SME Manager Upgrade and its Evolution Toward a Distributed Training and the evaluation of an innovative e-learning platform for manager upgrade in Small and Medium Enterprises (SME but it is more and more true for Small and Medium Enterprises (SME) that often don't have a well defined

  1. Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade

    E-Print Network [OSTI]

    , as companies found it cost effective to invest in new technology that used less energy. 1 of 8 1/10/2001 11 and financiers' increasing comfort level with energy upgrade initiatives means good news: It's easier to accessSponsored by: National Association of Energy Service Companies Financing An Energy Upgrade

  2. Evaluation of FOXFET biased ac-coupled silicon strip detector prototypes for CDF SVX upgrade

    SciTech Connect (OSTI)

    Laakso, M. [Fermi National Accelerator Lab., Batavia, IL (United States)]|[Research Inst. for High Energy Physics (SEFT), Helsinki (Finland)

    1992-03-01T23:59:59.000Z

    Silicon microstrip detectors for high-precision charged particle position measurements have been used in nuclear and particle physics for years. The detectors have evolved from simple surface barrier strip detectors with metal strips to highly complicated double-sided AC-coupled junction detectors. The feature of AC-coupling the readout electrodes from the diode strips necessitates the manufacture of a separate biasing structure for the strips, which comprises a common bias line together with a means for preventing the signal from one strip from spreading to its neighbors through the bias line. The obvious solution to this is to bias the strips through individual high value resistors. These resistors can be integrated on the detector wafer by depositing a layer of resistive polycrystalline silicon and patterning it to form the individual resistors. To circumvent the extra processing step required for polysilicon resistor processing and the rather difficult tuning of the process to obtain uniform and high enough resistance values throughout the large detector area, alternative methods for strip biasing have been devised. These include the usage of electron accumulation layer resistance for N{sup +}{minus} strips or the usage of the phenomenon known as the punch-through effect for P{sup +}{minus} strips. In this paper we present measurement results about the operation and radiation resistance of detectors with a punch-through effect based biasing structure known as a Field OXide Field-Effect Transistor (FOXFET), and present a model describing the FOXFET behavior. The studied detectors were prototypes for detectors to be used in the CDF silicon vertex detector upgrade.

  3. Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

  4. Modelling of the Current Profile Control with Neutral Beam Injection at ASDEX Upgrade and Comparison to JET

    E-Print Network [OSTI]

    Modelling of the Current Profile Control with Neutral Beam Injection at ASDEX Upgrade and Comparison to JET

  5. Theoretical Description of Heavy Impurity Transport and its Application to the Modelling of Tungsten in JET and ASDEX Upgrade

    E-Print Network [OSTI]

    Theoretical Description of Heavy Impurity Transport and its Application to the Modelling of Tungsten in JET and ASDEX Upgrade

  6. Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading

    E-Print Network [OSTI]

    1985-01-01T23:59:59.000Z

    Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading

  7. Design Robustness Analysis of Neuromorphic Circuits

    E-Print Network [OSTI]

    Bashaireh, Ahmad

    2014-04-23T23:59:59.000Z

    tasks such as pattern recognition. Few attempts have been made to investigate the effect of silicon failures beyond the circuit level. In this thesis, a method is proposed to evaluate the impact of process and environmental variations on the overall...

  8. Analog circuit for controlling acoustic transducer arrays

    DOE Patents [OSTI]

    Drumheller, Douglas S. (Cedar Crest, NM)

    1991-01-01T23:59:59.000Z

    A simplified ananlog circuit is presented for controlling electromechanical transducer pairs in an acoustic telemetry system. The analog circuit of this invention comprises a single electrical resistor which replaces all of the digital components in a known digital circuit. In accordance with this invention, a first transducer in a transducer pair of array is driven in series with the resistor. The voltage drop across this resistor is then amplified and used to drive the second transducer. The voltage drop across the resistor is proportional and in phase with the current to the transducer. This current is approximately 90 degrees out of phase with the driving voltage to the transducer. This phase shift replaces the digital delay required by the digital control circuit of the prior art.

  9. Analysis and Design of Resilient VLSI Circuits

    E-Print Network [OSTI]

    Garg, Rajesh

    2010-07-14T23:59:59.000Z

    (or error caused by radiation particle strikes) have become an increasingly troublesome issue for memory arrays as well as combinational logic circuits. Also, in the DSM era, process variations are increasing at an alarming rate, making it more...

  10. Generating Circuit Tests by Exploiting Designed Behavior

    E-Print Network [OSTI]

    Shirley, Mark Harper

    1988-12-01T23:59:59.000Z

    This thesis describes two programs for generating tests for digital circuits that exploit several kinds of expert knowledge not used by previous approaches. First, many test generation problems can be solved efficiently ...

  11. Microelectronic Devices and Circuits - 2006 Electronic Edition

    E-Print Network [OSTI]

    Fonstad, Clifton

    2006-10-01T23:59:59.000Z

    Combining semiconductor device physics and modeling with electronic circuit analysis and practice in a single sophomore/junior level microelectronics course, this textbook offers an integrated approach so students can truly ...

  12. Carbon nanotube synthesis for integrated circuit interconnects

    E-Print Network [OSTI]

    Nessim, Gilbert Daniel

    2009-01-01T23:59:59.000Z

    Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

  13. Analysis of neural circuits in vitro

    E-Print Network [OSTI]

    Wang, Jennifer Lynn

    2010-01-01T23:59:59.000Z

    This thesis is a collection of manuscripts addressing connectivity of neural circuits in cultured hippocampal neurons. These studies begin with an investigation of dopaminergic modulation of excitatory synapses in small ...

  14. Flexible Electronics: Materials, Circuits, and Design Methodology

    E-Print Network [OSTI]

    Kim, Chris H.

    Electronics: Today Display Solar cell Battery 4 #12;Next Generation Flexible Electronics Problem: Traumatic system Proposed EEG system Electrode sheet Flexible electronics ... ... ... Next Generation FlexibleFlexible Electronics: Materials, Circuits, and Design Methodology Chris H. Kim Dept. of Electrical

  15. Differential transimpedance amplifier circuit for correlated differential amplification

    DOE Patents [OSTI]

    Gresham, Christopher A. (Albuquerque, NM); Denton, M. Bonner (Tucson, AZ); Sperline, Roger P. (Tucson, AZ)

    2008-07-22T23:59:59.000Z

    A differential transimpedance amplifier circuit for correlated differential amplification. The amplifier circuit increase electronic signal-to-noise ratios in charge detection circuits designed for the detection of very small quantities of electrical charge and/or very weak electromagnetic waves. A differential, integrating capacitive transimpedance amplifier integrated circuit comprising capacitor feedback loops performs time-correlated subtraction of noise.

  16. Triple effect absorption chiller utilizing two refrigeration circuits

    DOE Patents [OSTI]

    DeVault, Robert C. (Knoxville, TN)

    1988-01-01T23:59:59.000Z

    A triple effect absorption method and apparatus having a high coefficient of performance. Two single effect absorption circuits are combined with heat exchange occurring between a condenser and absorber of a high temperature circuit, and a generator of a low temperature circuit. The evaporators of both the high and low temperature circuits provide cooling to an external heat load.

  17. Foundations for a Circuit Complexity Theory of Sensory Processing

    E-Print Network [OSTI]

    Maass, Wolfgang

    bounds, in particular with linear or almost linear total wire length. 1 Introduction Circuit complexity interest in neuromorphicengineering, especially analog VLSI, and the analysis of neural circuits mathematical analysis of such circuits. The standard mathematical approach is to model such circuits

  18. Challenges for Qualitative Electrical Reasoning in Automotive Circuit Simulation

    E-Print Network [OSTI]

    Snooke, Neal

    Challenges for Qualitative Electrical Reasoning in Automotive Circuit Simulation Neal Snooke it to be used for applications on realistic automotive circuits. The type of circuits for which it is most automotive circuits with more complex overall behaviour can be approximated using this type of modelling

  19. Double acting bit holder

    DOE Patents [OSTI]

    Morrell, Roger J. (Blommington, MN); Larson, David A. (Minneapolis, MN); Ruzzi, Peter L. (Eagan, MN)

    1994-01-01T23:59:59.000Z

    A double acting bit holder that permits bits held in it to be resharpened during cutting action to increase energy efficiency by reducing the amount of small chips produced. The holder consist of: a stationary base portion capable of being fixed to a cutter head of an excavation machine and having an integral extension therefrom with a bore hole therethrough to accommodate a pin shaft; a movable portion coextensive with the base having a pin shaft integrally extending therefrom that is insertable in the bore hole of the base member to permit the moveable portion to rotate about the axis of the pin shaft; a recess in the movable portion of the holder to accommodate a shank of a bit; and a biased spring disposed in adjoining openings in the base and moveable portions of the holder to permit the moveable portion to pivot around the pin shaft during cutting action of a bit fixed in a turret to allow front, mid and back positions of the bit during cutting to lessen creation of small chip amounts and resharpen the bit during excavation use.

  20. Double Chooz: Latest results

    E-Print Network [OSTI]

    J. I. Crespo-Anadón; for the Double Chooz collaboration

    2014-12-11T23:59:59.000Z

    The latest results from the Double Chooz experiment on the neutrino mixing angle $\\theta_{13}$ are presented. A detector located at an average distance of 1050 m from the two reactor cores of the Chooz nuclear power plant has accumulated a live time of 467.90 days, corresponding to an exposure of 66.5 GW-ton-year (reactor power $\\times$ detector mass $\\times$ live time). A revised analysis has boosted the signal efficiency and reduced the backgrounds and systematic uncertainties compared to previous publications, paving the way for the two detector phase. The measured $\\sin^2 2\\theta_{13} = 0.090^{+0.032}_{-0.029}$ is extracted from a fit to the energy spectrum. A deviation from the prediction above a visible energy of 4 MeV is found, being consistent with an unaccounted reactor flux effect, which does not affect the $\\theta_{13}$ result. A consistent value of $\\theta_{13}$ is measured in a rate-only fit to the number of observed candidates as a function of the reactor power, confirming the robustness of the result.

  1. Electrochemically controlled charging circuit for storage batteries

    DOE Patents [OSTI]

    Onstott, E.I.

    1980-06-24T23:59:59.000Z

    An electrochemically controlled charging circuit for charging storage batteries is disclosed. The embodiments disclosed utilize dc amplification of battery control current to minimize total energy expended for charging storage batteries to a preset voltage level. The circuits allow for selection of Zener diodes having a wide range of reference voltage levels. Also, the preset voltage level to which the storage batteries are charged can be varied over a wide range.

  2. Equivalent Circuit Modeling of Hysteresis Motors

    SciTech Connect (OSTI)

    Nitao, J J; Scharlemann, E T; Kirkendall, B A

    2009-08-31T23:59:59.000Z

    We performed a literature review and found that many equivalent circuit models of hysteresis motors in use today are incorrect. The model by Miyairi and Kataoka (1965) is the correct one. We extended the model by transforming it to quadrature coordinates, amenable to circuit or digital simulation. 'Hunting' is an oscillatory phenomenon often observed in hysteresis motors. While several works have attempted to model the phenomenon with some partial success, we present a new complete model that predicts hunting from first principles.

  3. Catalytic membrane reactors for chemicals upgrading and environmental control

    SciTech Connect (OSTI)

    Sammells, A.F. [Eltron Research, Inc., Boulder, CO (United States)

    1994-12-31T23:59:59.000Z

    Mixed ionic and electronic conducting catalytic membrane reactors are being developed for promoting a number of spontaneous chemical reactions either leading to synthesis of value added products or decomposition of environmental contaminants. The dense non-porous ceramic materials behave as short-circuited electrochemical devices whereby ions (oxygen anions or protons) and electrons become simultaneously mediated for one reaction surface to another. The rationale behind membrane materials selection and specific applications will be discussed.

  4. Norton Collector Circuit The Norton equivalent circuit seen looking into the collector can be used to solve for the

    E-Print Network [OSTI]

    Leach Jr.,W. Marshall

    Norton Collector Circuit The Norton equivalent circuit seen looking into the collector can be used with Thévenin sources connected to its base and emitter. With the collector grounded, the col- lector current is called the short-circuit output current or ic(sc). The current source in the Norton collector circuit has

  5. Network Upgrade for the SLC: PEP II Network

    SciTech Connect (OSTI)

    Crane, M.; Call, M.; Clark, S.; Coffman, F.; Himel, T.; Lahey, T.; Miller, E.; Sass, R.; /SLAC

    2011-09-09T23:59:59.000Z

    The PEP-II control system required a new network to support the system functions. This network, called CTLnet, is an FDDI/Ethernet based network using only TCP/IP protocols. An upgrade of the SLC Control System micro communications to use TCP/IP and SLCNET would allow all PEP-II control system nodes to use TCP/IP. CTLnet is private and separate from the SLAC public network. Access to nodes and control system functions is provided by multi-homed application servers with connections to both the private CTLnet and the SLAC public network. Monitoring and diagnostics are provided using a dedicated system. Future plans and current status information is included.

  6. NEUTRON RADIOGRAPHY (NRAD) REACTOR 64-ELEMENT CORE UPGRADE

    SciTech Connect (OSTI)

    John D. Bess

    2014-03-01T23:59:59.000Z

    The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately +/-1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

  7. Pressure Safety of JLAB 12GeV Upgrade Cryomodule

    SciTech Connect (OSTI)

    Cheng, Gary [JLAB; Wiseman, Mark A. [JLAB; Daly, Ed [JLAB

    2009-11-01T23:59:59.000Z

    This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Lab’s 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLAB’s methodologies for implementation of the 10 CFR 851 requirements are described.

  8. Avoiding Distribution System Upgrade Costs Using Distributed Generation

    SciTech Connect (OSTI)

    Schienbein, Lawrence A.; Balducci, Patrick J.; Nguyen, Tony B.; Brown, Daryl R.; DeSteese, John G.; Speer, Gregory A.

    2004-01-20T23:59:59.000Z

    PNNL, in cooperation with three utilities, developed a database and methodology to analyze and characterize the avoided costs of Distributed Generation (DG) deployment as an alternative to traditional distribution system investment. After applying a number of screening criteria to the initial set of 307 cases, eighteen were selected for detailed analysis. Alternative DG investment scenarios were developed for these cases to permit capital, operation, maintenance, and fuel costs to be identified and incorporated into the analysis. The “customer-owned” backup power generator option was also investigated. The results of the analysis of the 18 cases show that none yielded cost savings under the alternative DG scenarios. However, the DG alternative systems were configured using very restrictive assumptions concerning reliability, peak rating, engine types and acceptable fuel. In particular it was assumed that the DG alternative in each case must meet the reliability required of conventional distribution systems (99.91% reliability). The analysis was further constrained by a requirement that each substation meet the demands placed upon it by a one in three weather occurrence. To determine if, by relaxing these requirements, the DG alternative might be more viable, one project was re-examined. The 99.91% reliability factor was still assumed for normal operating conditions but redundancy required to maintain reliability was relaxed for the relatively few hours every three years where extreme weather caused load to exceed present substation capacity. This resulted in the deferment of capital investment until later years and reduced the number of engines required for the project. The cost of both the conventional and DG alternative also dropped because the centralized power generation, variable O&M, and DG fuels costs were calculated based on present load requirements in combination with long-term forecasts of load growth, as opposed to load requirements plus a buffer based on predictions of extraordinary weather conditions. Application of the relaxed set of assumptions reduced the total cost of the DG alternative by roughly 57 percent from $7.0 million to $3.0 million. The reduction, however, did not change the overall result of the analysis, as the cost of the conventional distribution system upgrade alternative remained lower at $1.7 million. This paper also explores the feasibility of using a system of backup generators to defer investment in distribution system infrastructure. Rather than expanding substation capacity at substations experiencing slow load growth rates, PNNL considered a scenario where diesel generators were installed on location at customers participating in a program designed to offer additional power security and reliability to the customer and connection to the grid. The backup generators, in turn, could be used to meet peak demand for a limited number of hours each year, thus deferring distribution system investment. Data from an existing program at one of the three participating utilities was used to quantify the costs associated with the backup generator scenario. The results of the “customer owned” backup power generator analysis showed that in all cases the nominal cost of the DG scenario is more than the nominal cost of the base-case conventional distribution system upgrade scenario. However, in two of the cases the total present value costs of the alternative backup generator scenarios were between 15 and 22% less than those for the conventional scenarios. Overall, the results of the study offer considerable encouragement that the use of DG systems can defer conventional distribution system upgrades under the right conditions and when the DG configurations are intelligently designed. Using existing customer-owned DG to defer distribution system upgrades appears to be an immediate commercially-viable opportunity.

  9. Upgrade of the cryogenic CERN RF test facility

    SciTech Connect (OSTI)

    Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B. [CERN - European Organization for Nuclear Research, CH-1211 Geneva 23 (Switzerland); Koettig, T. [ESS - European Spallation Source, Box 176, 221 00 Lund (Sweden)

    2014-01-29T23:59:59.000Z

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

  10. Nb3Sn Quadrupoles Designs For The LHC Upgrades

    SciTech Connect (OSTI)

    Felice, Helene

    2008-05-19T23:59:59.000Z

    In preparation for the LHC luminosity upgrades, high field and large aperture Nb{sub 3}Sn quadrupoles are being studied. This development has to incorporate all the relevant features for an accelerator magnet like alignment and cooling channels. The LARP HQ model is a high field and large bore quadrupole that will meet these requirements. The 2-layer coils are surrounded by a structure based on key and bladder technology with supporting iron yoke and aluminum shell. This structure is aimed at pre-stress control, alignment and field quality. We present here the magnetic and mechanical design of HQ, along with recent progress on the development of the first 1-meter model.

  11. Raytheon: Compressed Air System Upgrade Saves Energy and Improves Performance

    SciTech Connect (OSTI)

    Not Available

    2005-04-01T23:59:59.000Z

    In 2003, Raytheon Company upgraded the efficiency of the compressed air system at its Integrated Air Defense Center in Andover, Massachusetts, to save energy and reduce costs. Worn compressors and dryers were replaced, a more sophisticated control strategy was installed, and an aggressive leak detection and repair effort was carried out. The total cost of these improvements was $342,000; however, National Grid, a utility service provider, contributed a $174,000 incentive payment. Total annual energy and maintenance cost savings are estimated at $141,500, and energy savings are nearly 1.6 million kWh. This case study was prepared for the U.S. Department of Energy's Industrial Technologies Program.

  12. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    SciTech Connect (OSTI)

    Josh A. Salmond

    2009-08-07T23:59:59.000Z

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  13. Reaction sequence of metallopetroporphyrins during heavy residuum upgrading

    SciTech Connect (OSTI)

    Reynolds, J.G.; Biggs, W.R.; Bezman, S.A.

    1986-04-01T23:59:59.000Z

    The authors analyzed the metallopetroporphyrins and the metallo-nonporphyrins during thermal and catalytic upgrading of heavy residua. By size exclusion chromatography with element specific detection (SEC-HPLC-ICP), they found thermal treatment reduces the size of the remaining metal-containing compounds, while catalytic treatment preferentially removes the metal-containing molecules in the size range of the catalyst pore. In both cases the metallopetroporphyrins process easily. By applying column chromatography and UV-vis spectroscopy, we have been able to detect and quantitate some of the probable intermediates of the demetallation sequence for vanadyl petroporphyrins. These results show the demetallation pathway is probably through the reduction of the porphyrins to chlorins and other reduced species. These results are in agreement with metalloporphyrin model compound work seen in the literature.

  14. QCALT: a tile calorimeter for KLOE-2 upgrade

    E-Print Network [OSTI]

    M. Cordelli; G. Corradi; F. Happacher; M. Martini; S. Miscetti; C. Paglia; A. Saputi; I. Sarra; D. Tagnani

    2009-06-05T23:59:59.000Z

    The upgrade of the DA$\\Phi$NE machine layout requires a modification of the size and position of the inner focusing quadrupoles of KLOE-2 thus asking for the realization of two new calorimeters covering the quadrupoles area. To improve the reconstruction of $K_L\\to 2\\pi^0$ events with photons hitting the quadrupoles a calorimeter with high efficiency to low energy photons (20-300 MeV), time resolution of less than 1 ns and space resolution of few cm, is needed. To match these requirements, we are designing a tile calorimeter, QCALT, where each single tile is readout by mean of SiPM for a total granularity of 2400 channels. We show first tests of the different calorimeter components.

  15. Nuclear materials control and accountability criteria for upgrades measures

    SciTech Connect (OSTI)

    Erkkila, B.H.; Hatcher, C.R.

    1998-11-01T23:59:59.000Z

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

  16. Neutrinoless Double Beta-Decay

    E-Print Network [OSTI]

    S. M. Bilenky

    2010-01-12T23:59:59.000Z

    The neutrinoless double $\\beta$-decay of nuclei is reviewed. We discuss neutrino mixing and 3x3 PMNS neutrino mixing matrix. Basic theory of neutrinoless double $\\beta$-decay is presented in some details. Results of different calculations of nuclear matrix element are discussed. Experimental situation is considered. The Appendix is dedicated to E. Majorana (brief biography and his paper in which the theory of Majorana particles is given)

  17. Chapter 54. Superconducting Circuits and Quantum Computing Superconducting Circuits and Quantum Computing

    E-Print Network [OSTI]

    Chapter 54. Superconducting Circuits and Quantum Computing 54-1 Superconducting Circuits. William D. Oliver (MIT Lincoln Laboratory Senior Staff Member, RLE affiliate) Overview: Superconducting computer. Our qubit species of choice is the superconducting persistent-current (PC) qubit (also known

  18. PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE.

    SciTech Connect (OSTI)

    BEN-ZVI,I.; BABZIEN,M.; BLUM,E.; CASEY,W.; CHANG,X.; GRAVES,W.; HASTINGS,J.; HULBERT,S.; JOHNSON,E.; KAO,C.C.; KRAMER,S.; KRINSKY,S.; MORTAZAVI,P.; MURPHY,J.; OZAKI,S.; PJEROV,S.; PODOBEDOV,B.; RAKOWSKY,G.; ROSE,J.; SHAFTAN,T.; SHEEHY,B.; SIDDONS,D.; SMEDLEY,J.; SRINIVASAN-RAO,T.; TOWNE,N.; WANG,J.M.; WANG,X.; WU,J.; YAKIMENKO,V.; YU,L.H.

    2001-06-18T23:59:59.000Z

    We describe a major paradigm shift in the approach to the production of synchrotron radiation This change will considerably improve the scientific capabilities of synchrotron light sources. We introduce plans for an upgrade of the National Synchrotron Light Source (NSLS). This upgrade will be based on the Photoinjected Energy Recovering Linac (PERL). This machine emerges from the union of two technologies, the laser-photocathode RF gun (photoinjector) and superconducting linear accelerators with beam energy recovery (Energy Recovering Linac). The upgrade will bring the NSLS users many new insertion device beam lines, brightness greater than 3rd generation lightsource's and ultra-short pulse capabilities, not possible with storage ring light sources.

  19. Upgrade of the D0 detector: The Tevatron beyond 2 fb**(-1)

    SciTech Connect (OSTI)

    Quinn, Breese; /Mississippi U.

    2005-01-01T23:59:59.000Z

    Recent performance of Fermilab's Tevatron has exceeded this year's design goals and further accelerator upgrades are underway. The high-luminosity period which follows these improvements is known as Run IIb. The D0 experiment is in the midst of a comprehensive upgrade program designed to enable it to thrive with much higher data rate and occupancy. Extensive modifications of and additions to all levels of the trigger and the silicon tracker are in progress. All upgrade projects are on schedule for installation in the 2005 shutdown.

  20. Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade

    SciTech Connect (OSTI)

    Brzezniak, J.; Fast, R.W.; Krempetz, K.

    1994-05-01T23:59:59.000Z

    This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

  1. The Upgrade of the ATLAS Tile Calorimeter Readout Electronics for Phase II

    E-Print Network [OSTI]

    ATLAS Tile Collaboration; The ATLAS collaboration

    2015-01-01T23:59:59.000Z

    The Large Hadron Collider at CERN is scheduled to undergo a major upgrade, called the Phase II Upgrade, in 2022. The ATLAS Tile Calorimeter community will do major modifications to the sub-detector to account for the increased luminosity. More specifically, a large proportion of the current front and back-end electronics will be upgraded in order to digitize all signals generated in the Calorimeters. A Demonstrator program has been established, which combines the current and future architectures, as a proof of principle. The insertion of the first demonstrator is planned for the end of 2015.

  2. Dual circuit embossed sheet heat transfer panel

    DOE Patents [OSTI]

    Morgan, G.D.

    1984-02-21T23:59:59.000Z

    A heat transfer panel provides redundant cooling for fusion reactors or the like environment requiring low-mass construction. Redundant cooling is provided by two independent cooling circuits, each circuit consisting of a series of channels joined to inlet and outlet headers. The panel comprises a welded joinder of two full-size and two much smaller partial-size sheets. The first full-size sheet is embossed to form first portions of channels for the first and second circuits, as well as a header for the first circuit. The second full-sized sheet is then laid over and welded to the first full-size sheet. The first and second partial-size sheets are then overlaid on separate portions of the second full-sized sheet, and are welded thereto. The first and second partial-sized sheets are embossed to form inlet and outlet headers, which communicate with channels of the second circuit through apertures formed in the second full-sized sheet. 6 figs.

  3. Lookout device for high voltage circuit breaker

    SciTech Connect (OSTI)

    Kozlowski, L.J.; Shirey, L.A.

    1991-12-31T23:59:59.000Z

    An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

  4. Lockout device for high voltage circuit breaker

    DOE Patents [OSTI]

    Kozlowski, L.J.; Shirey, L.A.

    1993-01-26T23:59:59.000Z

    An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

  5. Lockout device for high voltage circuit breaker

    SciTech Connect (OSTI)

    Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

    1993-01-01T23:59:59.000Z

    An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the repsective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

  6. An analysis of reversible multiplier circuits

    E-Print Network [OSTI]

    Anindita Banerjee; Anirban Pathak

    2009-07-20T23:59:59.000Z

    Multiplier circuits play an important role in reversible computation, which is helpful in diverse areas such as low power CMOS design, optical computing, DNA computing and bioinformatics. Here we propose a new reversible multiplier circuit with optimized hardware complexity. The optimized multiplier circuit is compared with the earlier proposals. We have shown that the quantum cost of earlier proposals can be further reduced with the help of existing local optimization algorithms (e.g. template matching, moving rule and deletion rule). A systematic protocol for reduction of quantum cost has been proposed. It has also been shown that the advantage in gate count obtained in some of the earlier proposals by introduction of new reversible gates is an artifact and if it is allowed then every circuit block can be reduced to a single gate. Further, it is shown that the 4x4 reversible gates proposed for designing of a component of multiplier circuit (full adder) is neither unique nor special and many such 4x4 gates may be proposed. As example three such new gates have been presented here and it is shown that the proposed gates are universal. It is also shown that the total cost of our design is minimum.

  7. On the Synthesis of Sequential Reversible Circuit

    E-Print Network [OSTI]

    Anindita Banerjee; Anirban Pathak

    2007-07-28T23:59:59.000Z

    Reversible circuits for SR flip flop, JK flip flop, D flip flop, T flip flop, Master Slave D flip flop and Master Slave JK flip flop have been provided with three different logical approaches. All the circuits have been optimized with the help of existing local optimization algorithms (e.g. template matching, moving rule and deletion rule) and the optimized sequential circuits have been compared with the earlier proposals for the same. It has been shown that the present proposals have lower gate complexities and lower number of garbage bits compared to the earlier proposals. It has also been shown that the advantage in gate count obtained in some of the earlier proposals by introduction of New gates is an \\textcolor{black}{artifact} and if it is allowed then every circuit block (unless there is a measurement) can be reduced to a single gate. Further, it is shown that a reversible flip flop can be constructed even without a feedback. In this context, some important conceptual issues related to the designing and optimization of sequential reversible circuits have also been addressed.

  8. The CEBAF II/ELIC Upgrade of CEBAF

    SciTech Connect (OSTI)

    Jefferson Lab

    2003-04-01T23:59:59.000Z

    A strong physics case has been established for constructing an extremely high luminosity ({approx} 10{sup 38} cm{sup -2} sec{sup -1}), CEBAF-like accelerator with energies in the 20-30 GeV range. There have also been a series of studies investigating the scientific potential of an electron-light ion collider (ELIC) operating in the 20-65 GeV center-of-mass energy range. The facility at Jefferson Lab can be upgraded to provide either (or both) of these options in a straightforward manner. An energy upgrade of CEBAF to 25 GeV would support extensions of the CEBAF 12 GeV program to smaller x and higher Q{sup 2}, and, in particular, support a program of deeply virtual meson production that would permit the flavor separation of the Generalized Parton Distributions that characterize the nucleon's properties. A high-luminosity electron light ion collider (ELIC) in the center-of-mass energy range {radical}s of 20-65 GeV, would build on the physics insights obtained from the CEBAF 12 GeV upgrade, and expand on our understanding of the structure of the nucleon and nuclear binding. While questions remain on the details of the science program and on technical aspects of the facility design, we expect that the facility's research program will be absolutely central to the field of nuclear physics. In particular, such a facility will provide a unique tool to: (1) Complete our quantitative understanding of how quarks and gluons provide the binding and the spin of the nucleon; (2) Understand how quarks and gluons evolve into hadrons via the dynamics of confinement; and (3) Refine our understanding of how the nuclear binding arises from QCD. The April 2002 Long-Range Plan for the Next Decade, developed by the 2001-2002 Nuclear Sciences Advisory Committee (NSAC) Long Range Planning Process, noted that a 'ring-linac option where a linear electron beam is incident on a stored ion beam' is one of two classes of machine design for an electron-ion collider (the other is a ring-ring design). Since then, conceptual design studies for the facility have continued, and our latest results indicate that luminosities of up to 10{sup 35} cm{sup -2} sec{sup -1} are within reach, with a combination of a high-intensity, energy-recovered linac and a ring that has been optimized for this physics. A number of technical challenges remain, and several R&D projects have been started. These include: electron cooling of protons/ions (in collaboration with BNL/BINP); the design of an interaction region and detector that, taken together, support the combination of the very high luminosity and very high detector acceptance and resolution essential to carry out this physics program; and the demonstration of the feasibility of energy recovery at high current and high energy. For the latter, an early test on the GeV scale will occur at JLab in March, 2003. Given the level of R&D remaining to be done, the readiness of this project should be categorized as 'scientific and engineering issues still need to be resolved'.

  9. Lithium Circuit Test Section Design and Fabrication

    SciTech Connect (OSTI)

    Godfroy, Thomas; Garber, Anne; Martin, James [NASA Marshall Space Flight Center, Nuclear Systems Engineering Analysis, Huntsville, Alabama 35812 (United States)

    2006-01-20T23:59:59.000Z

    The Early Flight Fission -- Test Facilities (EFF-TF) team has designed and built an actively pumped lithium flow circuit. Modifications were made to a circuit originally designed for NaK to enable the use of lithium that included application specific instrumentation and hardware. Component scale freeze/thaw tests were conducted to both gain experience with handling and behavior of lithium in solid and liquid form and to supply anchor data for a Generalized Fluid System Simulation Program (GFSSP) model that was modified to include the physics for freeze/thaw transitions. Void formation was investigated. The basic circuit components include: reactor segment, lithium to gas heat exchanger, electromagnetic (EM) liquid metal pump, load/drain reservoir, expansion reservoir, instrumentation, and trace heaters. This paper discusses the overall system design and build and the component testing findings.

  10. Package for integrated optic circuit and method

    DOE Patents [OSTI]

    Kravitz, Stanley H. (26 Aspen Rd., Placitas, NM 87043); Hadley, G. Ronald (6012 Annapolis NE., Albuquerque, NM 87111); Warren, Mial E. (3825 Mary Ellen NE., Albuquerque, NM 87111); Carson, Richard F. (1036 Jewel Pl. NE., Albuquerque, NM 87123); Armendariz, Marcelino G. (1023 Oro Real NE., Albuquerque, NM 87123)

    1998-01-01T23:59:59.000Z

    A structure and method for packaging an integrated optic circuit. The package comprises a first wall having a plurality of microlenses formed therein to establish channels of optical communication with an integrated optic circuit within the package. A first registration pattern is provided on an inside surface of one of the walls of the package for alignment and attachment of the integrated optic circuit. The package in one embodiment may further comprise a fiber holder for aligning and attaching a plurality of optical fibers to the package and extending the channels of optical communication to the fibers outside the package. In another embodiment, a fiber holder may be used to hold the fibers and align the fibers to the package. The fiber holder may be detachably connected to the package.

  11. Radiation-hardened transistor and integrated circuit

    DOE Patents [OSTI]

    Ma, Kwok K. (Albuquerque, NM)

    2007-11-20T23:59:59.000Z

    A composite transistor is disclosed for use in radiation hardening a CMOS IC formed on an SOI or bulk semiconductor substrate. The composite transistor has a circuit transistor and a blocking transistor connected in series with a common gate connection. A body terminal of the blocking transistor is connected only to a source terminal thereof, and to no other connection point. The blocking transistor acts to prevent a single-event transient (SET) occurring in the circuit transistor from being coupled outside the composite transistor. Similarly, when a SET occurs in the blocking transistor, the circuit transistor prevents the SET from being coupled outside the composite transistor. N-type and P-type composite transistors can be used for each and every transistor in the CMOS IC to radiation harden the IC, and can be used to form inverters and transmission gates which are the building blocks of CMOS ICs.

  12. Electronic circuit for measuring series connected electrochemical cell voltages

    DOE Patents [OSTI]

    Ashtiani, Cyrus N. (West Bloomfield, MI); Stuart, Thomas A. (Toledo, OH)

    2000-01-01T23:59:59.000Z

    An electronic circuit for measuring voltage signals in an energy storage device is disclosed. The electronic circuit includes a plurality of energy storage cells forming the energy storage device. A voltage divider circuit is connected to at least one of the energy storage cells. A current regulating circuit is provided for regulating the current through the voltage divider circuit. A voltage measurement node is associated with the voltage divider circuit for producing a voltage signal which is proportional to the voltage across the energy storage cell.

  13. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  14. EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

  15. Assessing the Effects of a Program to Promote Energy-Efficiency Upgrades in Existing Homes

    E-Print Network [OSTI]

    Lee, A.; Larkin, J.; Gobris, M. K.; Boughen, S.; Staples, J.

    2002-01-01T23:59:59.000Z

    Energy efficient mortgages (EEMs) are intended to mitigate some of the financial barriers to upgrading the energy efficiency of existing (and sometimes new) houses. The Time of Sale Energy Renovation Program (TOSER) is designed to overcome key...

  16. Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  17. All that glitters is not gold : unexpected lessons from a slum upgrading program in Brazil

    E-Print Network [OSTI]

    Zuin, Valentina

    2005-01-01T23:59:59.000Z

    This paper looks at the Ribeira Azul Slum Upgrading Program in Salvador de Bahia Brazil, implemented by the development agency of the state of Bahia, CONDER, and the Italian NGO Associazione Volontari per il Servizio ...

  18. ATLAS Tracker Upgrade: Silicon Strip Detectors for the sLHC

    E-Print Network [OSTI]

    ) 2.6% 1.8% 1.0% 3 Sep 2010 5S.Burdin / Atlas Tracker Upgrade #12;3 Sep 2010 S.Burdin / Atlas Tracker

  19. PPPL to launch major upgrade of key fusion energy test facility...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to launch major upgrade of key fusion energy test facility NSTX project will produce most powerful spherical torus in the world By John Greenwald January 9, 2012 Tweet Widget...

  20. Rigorous Simulation Model of Kerogen Pyrolysis for the In-situ Upgrading of Oil Shales 

    E-Print Network [OSTI]

    Lee, Kyung Jae

    2014-10-09T23:59:59.000Z

    Oil shale is a vast, yet untapped energy source, and the pyrolysis of kerogen in the oil shales releases recoverable hydrocarbons. In this dissertation, we investigate how to increase process efficiency and decrease the costs of in-situ upgrading...

  1. Participation as an end versus a means : understanding a recurring dilemma in urban upgrading

    E-Print Network [OSTI]

    Fallavier, Pierre

    2007-01-01T23:59:59.000Z

    Since the 1920s, participatory approaches to urban upgrading in developing nations have demonstrated that involving the urban poor in the physical, social, and economic development of their settlements could improve their ...

  2. Automation of airlift scheduling for the upgraded command and control system of military airlift command

    E-Print Network [OSTI]

    Simpson, R. W.

    1984-01-01T23:59:59.000Z

    This report describes a conceptual design for automation of the scheduling of airlift activities as part of the current upgrade of the MAC C2 System. It defines the airlift scheduling problem in generic terms before reviewing ...

  3. A recommended course of action for upgrading Garduda Operations Control Systems

    E-Print Network [OSTI]

    Mathaisel, Dennis F. X.

    1995-01-01T23:59:59.000Z

    Introduction: The purpose of this document is to construct a recommended course of action in the next year for Garuda Operations Control in its efforts to upgrade its information systems technology. The process of installing ...

  4. Changes in measured lightning return stroke peak current after the 1994 National Lightning Detection Network upgrade

    E-Print Network [OSTI]

    Wacker, Robert Scott

    1997-01-01T23:59:59.000Z

    Since a comprehensive upgrade of the US National Lightning Detection Network (NLDN) in 1994, the mean peak current of detected cloud-to-ground (CG) lightning flashes has decreased, the number of detected flashes has increased, and the percentage...

  5. Rigorous Simulation Model of Kerogen Pyrolysis for the In-situ Upgrading of Oil Shales

    E-Print Network [OSTI]

    Lee, Kyung Jae

    2014-10-09T23:59:59.000Z

    Oil shale is a vast, yet untapped energy source, and the pyrolysis of kerogen in the oil shales releases recoverable hydrocarbons. In this dissertation, we investigate how to increase process efficiency and decrease the costs of in-situ upgrading...

  6. Microsoft PowerPoint - 03a_PDCI-Upgrade_final_KAM [Compatibility...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O N CELILO TERMINAL UPGRADE NEPA - CX for all terminal activities completed June 2013. HVDC Supplier contract was awarded to ABB December 2012 for 260M. ABB is world leader in...

  7. Guidelines for Home Energy Professionals: Standard Work Specifications for Single-Family Home Energy Upgrades

    Broader source: Energy.gov [DOE]

    The Standard Work Specifications (SWS) for Single-Family Home Energy Upgrades define the minimum acceptable outcomes for any weatherization or home performance task to be effective, durable, and safe.

  8. Hybrid high direct current circuit interrupter

    DOE Patents [OSTI]

    Rockot, J.H.; Mikesell, H.E.; Jha, K.N.

    1998-08-11T23:59:59.000Z

    A device and a method are disclosed for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens. 7 figs.

  9. Hybrid high direct current circuit interrupter

    SciTech Connect (OSTI)

    Rockot, J.H.; Mikesell, H.E.; Jha, K.N.

    1996-12-31T23:59:59.000Z

    A device and a method for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens.

  10. Circuit breaker monitoring application using wireless communication

    E-Print Network [OSTI]

    Ved, Nitin

    2007-04-25T23:59:59.000Z

    synchronizes recorded data to a global time standard enabling system-wide applications to use the recorded data. ? Ease of installation: The circuit breaker monitoring system can be installed at a substation within minutes by one or two personnel. The system... is powered by a 130V DC source, usually a battery in the substation control house, called the supply volt- age. All elements of the circuit are connected between the positive and the negative terminals of the supply voltage.Another voltage source called...

  11. CEBAF energy upgrade program including re-work of CEBAF cavities

    SciTech Connect (OSTI)

    Joseph Preble

    2008-02-12T23:59:59.000Z

    The Thomas Jefferson National Accelerator Facility, Jefferson Lab, is planning an upgrade of the CEBAF accelerator from a maximum energy of 6 GeV to 12 GeV and from 3 to 4 experimental halls. This paper will discuss the plans for upgrading the energy of the machine which requires improvements of the existing Super Conducting Radio Frequency (SRF) cryomodules and the additions of ten newly designed high performance SRF cryomodules.

  12. Physics Opportunities with the 12 GeV Upgrade at Jefferson Lab

    E-Print Network [OSTI]

    Dudek, Jozef; Essig, Rouven; Kumar, Krishna; Meyer, Curtis; McKeown, Robert; Meziani, Zein Eddine; Miller, Gerald A; Pennington, Michael; Richards, David; Weinstein, Larry; Young, Glenn

    2012-01-01T23:59:59.000Z

    This white paper summarizes the scientific opportunities for utilization of the upgraded 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab. It is based on the 52 proposals recommended for approval by the Jefferson Lab Physics Advisory Committee.The upgraded facility will enable a new experimental program with substantial discovery potential to address important topics in nuclear, hadronic, and electroweak physics.

  13. Physics Opportunities with the 12 GeV Upgrade at Jefferson Lab

    E-Print Network [OSTI]

    Jozef Dudek; Rolf Ent; Rouven Essig; Krishna Kumar; Curtis Meyer; Robert McKeown; Zein Eddine Meziani; Gerald A. Miller; Michael Pennington; David Richards; Larry Weinstein; Glenn Young

    2012-08-07T23:59:59.000Z

    This white paper summarizes the scientific opportunities for utilization of the upgraded 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab. It is based on the 52 proposals recommended for approval by the Jefferson Lab Program Advisory Committee.The upgraded facility will enable a new experimental program with substantial discovery potential to address important topics in nuclear, hadronic, and electroweak physics.

  14. High Resolution BPM Upgrade for the ATF Damping Ring at KEK

    E-Print Network [OSTI]

    Eddy, N; Fellenz, B; Gianfelice-Wendt, E; Prieto, P; Rechenmacher, R; Semenov, A; Voy, D; Wendt, M; Zhang, D; Terunuma, N; Urakawa, J

    2012-01-01T23:59:59.000Z

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented.

  15. DRIVER ACCELERATOR DESIGN FOR THE 10 KW UPGRADE OF THE JEFFERSON LAB IR FEL

    E-Print Network [OSTI]

    DRIVER ACCELERATOR DESIGN FOR THE 10 KW UPGRADE OF THE JEFFERSON LAB IR FEL D. Douglas, S. V, Newport News, VA23606, USA Abstract An upgrade of the Jefferson Lab IR FEL [1] is now un- der construction. It will provide 10 kW output light power in a wavelength range of 2­10 µm. The FEL will be driven by a modest

  16. New Double Soft Emission Theorems

    E-Print Network [OSTI]

    Freddy Cachazo; Song He; Ellis Ye Yuan

    2015-03-16T23:59:59.000Z

    We study the behavior of the tree-level S-matrix of a variety of theories as two particles become soft. By analogy with the recently found subleading soft theorems for gravitons and gluons, we explore subleading terms in double soft emissions. We first consider double soft scalar emissions and find subleading terms that are controlled by the angular momentum operator acting on hard particles. The order of the subleading theorems depends on the presence or not of color structures. Next we obtain a compact formula for the leading term in a double soft photon emission. The theories studied are a special Galileon, DBI, Einstein-Maxwell-Scalar, NLSM and Yang-Mills-Scalar. We use the recently found CHY representation of these theories in order to give a simple proof of the leading order part of all these theorems

  17. Predicting Neutrinoless Double Beta Decay

    E-Print Network [OSTI]

    M. Hirsch; Ernest Ma; J. W. F. Valle; A. Villanova del Moral

    2005-07-12T23:59:59.000Z

    We give predictions for the neutrinoless double beta decay rate in a simple variant of the A_4 family symmetry model. We show that there is a lower bound for the neutrinoless double beta decay amplitude even in the case of normal hierarchical neutrino masses, corresponding to an effective mass parameter |m_{ee}| >= 0.17 \\sqrt{\\Delta m^2_{ATM}}. This result holds both for the CP conserving and CP violating cases. In the latter case we show explicitly that the lower bound on |m_{ee}| is sensitive to the value of the Majorana phase. We conclude therefore that in our scheme, neutrinoless double beta decay may be accessible to the next generation of high sensitivity experiments.

  18. MPC and A upgrades at the Institute of Theoretical and Experimental Physics (ITEP)

    SciTech Connect (OSTI)

    Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Baumann, M. [Sandia National Labs., Albuquerque, NM (United States)] [and others

    1998-07-01T23:59:59.000Z

    Materials Protection, Control and Accounting (MPC and A) equipment upgrades are complete at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of weapons-potential nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the US-Russian program to upgrade MPC and A systems. An initial site visit and assessment were conducted in September 1996 to establish communication between ITEP, the US Department of Energy (DOE), and participating US National Laboratories. Subsequently, an agreement was reached to develop two master plans for MPC and A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) assisted in developing a plan for Material Control and Accounting (MC and A) upgrades, and Sandia National Laboratories (SNL) assisted in developing a plan for Physical Protection System (PPS) upgrades. The MC and A plan included MC and A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, portal and hand-held nuclear material monitors, and a nuclear materials accounting system. The PPS plan included basic PPS design training, Central Alarm Station (CAS) relocation and equipment upgrades, a site and critical-building access control system, intrusion detection, alarm assessment, and guard force communications.

  19. Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992

    SciTech Connect (OSTI)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C. [Univ. of Texas, Austin, TX (US). Center for Electromechanics] [Univ. of Texas, Austin, TX (US). Center for Electromechanics

    1992-12-31T23:59:59.000Z

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

  20. Linac cryogenic distribution system maintenance and upgrades at JLab

    SciTech Connect (OSTI)

    Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

    2014-01-29T23:59:59.000Z

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  1. Linac cryogenic distribution system maintenance and upgrades at Jlab

    SciTech Connect (OSTI)

    Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

    2014-01-01T23:59:59.000Z

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  2. Physical Protection System Upgrades - Optimizing for Performance and Cost

    SciTech Connect (OSTI)

    Bouchard, Ann M.; Hicks, Mary Jane

    1999-07-09T23:59:59.000Z

    CPA--Cost and Performance Analysis--is an architecture that supports analysis of physical protection systems and upgrade options. ASSESS (Analytic System and Software for Evaluating Security Systems), a tool for evaluating performance of physical protection systems, currently forms the cornerstone for evaluating detection probabilities and delay times of the system. Cost and performance data are offered to the decision-maker at the systems level and to technologists at the path-element level. A new optimization engine has been attached to the CPA methodology to automate analyses of many combinations (portfolios) of technologies. That engine controls a new analysis sequencer that automatically modifies ASSESS PPS files (facility descriptions), automatically invokes ASSESS Outsider analysis and then saves results for post-processing. Users can constrain the search to an upper bound on total cost, to a lower bound on level of performance, or to include specific technologies or technology types. This process has been applied to a set of technology development proposals to identify those portfolios that provide the most improvement in physical security for the lowest cost to install, operate and maintain at a baseline facility.

  3. Screening of processing and upgrading schemes. Task 3

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  4. Ammonia removal process upgrade to the Acme Steel Coke Plant

    SciTech Connect (OSTI)

    Harris, J.L. [Acme Steel Co., Chicago, IL (United States). Chicago Coke Plant

    1995-12-01T23:59:59.000Z

    The need to upgrade the ammonia removal process at the Acme Steel Coke Plant developed with the installation of the benzene NESHAP (National Emission Standard for Hazardous Air Pollutants) equipment, specifically the replacement of the final cooler. At Acme Steel it was decided to replace the existing open cooling tower type final cooler with a closed loop direct spray tar/water final cooler. This new cooler has greatly reduced the emissions of benzene, ammonia, hydrogen sulfide and hydrogen cyanide to the atmosphere, bringing them into environmental compliance. At the time of its installation it was not fully recognized as to the effect this would have on the coke oven gas composition. In the late seventies the decision had been made at Acme Steel to stop the production of ammonia sulfate salt crystals. The direction chosen was to make a liquid ammonia sulfate solution. This product was used as a pickle liquor at first and then as a liquid fertilizer as more markets were developed. In the fall of 1986 the ammonia still was brought on line. The vapors generated from the operation of the stripping still are directed to the inlet of the ammonia absorber. At that point in time it was decided that an improvement to the cyclical ammonia removal process was needed. The improvements made were minimal yet allowed the circulation of solution through the ammonia absorber on a continuous basis. The paper describes the original batch process and the modifications made which allowed continuous removal.

  5. Future Upgrade and Physics Perspectives of the ALICE TPC

    E-Print Network [OSTI]

    Taku Gunji; for the ALICE Collaboration

    2014-08-15T23:59:59.000Z

    The ALICE experiment at the Large Hadron Collider (LHC) proposes major detector upgrades to fully exploit the increase of the luminosity of the LHC in RUN~3 and to extend the physics reach for rare probes at low transverse momentum. The Time Projection Chamber (TPC) is one of the main tracking and PID devices in the central barrel of ALICE. The maximum trigger rate of the TPC is currently limited to about 3.5 kHz by the operation of a gating grid system. In order to make full use of the luminosity in RUN 3, the TPC is foreseen to be operated in an ungated mode with continuous readout. The existing MWPC readout will be replaced by a Micro-Pattern Gaseous Detector (MPGD) based readout, which provides intrinsic ion capture capability without gating. Extensive detector R\\&D employing Gas Electron Multiplier (GEM) and Micro-Mesh Gaseous detector (Micromegas) technologies, and simulation studies to advance the techniques for the corrections of space-charge distortions have been performed since 2012. In this paper, the expected detector performance and the status of the R\\&D program to achieve this ambitious goal are described.

  6. Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2008-08-11T23:59:59.000Z

    The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

  7. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01T23:59:59.000Z

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  8. BENCHMARKING UPGRADED HOTSPOT DOSE CALCULATIONS AGAINST MACCS2 RESULTS

    SciTech Connect (OSTI)

    Brotherton, Kevin

    2009-04-30T23:59:59.000Z

    The radiological consequence of interest for a documented safety analysis (DSA) is the centerline Total Effective Dose Equivalent (TEDE) incurred by the Maximally Exposed Offsite Individual (MOI) evaluated at the 95th percentile consequence level. An upgraded version of HotSpot (Version 2.07) has been developed with the capabilities to read site meteorological data and perform the necessary statistical calculations to determine the 95th percentile consequence result. These capabilities should allow HotSpot to join MACCS2 (Version 1.13.1) and GENII (Version 1.485) as radiological consequence toolbox codes in the Department of Energy (DOE) Safety Software Central Registry. Using the same meteorological data file, scenarios involving a one curie release of {sup 239}Pu were modeled in both HotSpot and MACCS2. Several sets of release conditions were modeled, and the results compared. In each case, input parameter specifications for each code were chosen to match one another as much as the codes would allow. The results from the two codes are in excellent agreement. Slight differences observed in results are explained by algorithm differences.

  9. Double stranded nucleic acid biochips

    DOE Patents [OSTI]

    Chernov, Boris; Golova, Julia

    2006-05-23T23:59:59.000Z

    This invention describes a new method of constructing double-stranded DNA (dsDNA) microarrays based on the use of pre-synthesized or natural DNA duplexes without a stem-loop structure. The complementary oligonucleotide chains are bonded together by a novel connector that includes a linker for immobilization on a matrix. A non-enzymatic method for synthesizing double-stranded nucleic acids with this novel connector enables the construction of inexpensive and robust dsDNA/dsRNA microarrays. DNA-DNA and DNA-protein interactions are investigated using the microarrays.

  10. Attosecond Double-Slit Experiment

    SciTech Connect (OSTI)

    Lindner, F.; Schaetzel, M.G.; Baltuska, A.; Goulielmakis, E. [Max-Planck-Institut fuer Quantenoptik, 85748 Garching (Germany); Walther, H. [Max-Planck-Institut fuer Quantenoptik, 85748 Garching (Germany); Ludwig-Maximilians-Universitaet Muenchen, 85748 Garching (Germany); Krausz, F. [Max-Planck-Institut fuer Quantenoptik, 85748 Garching (Germany); Ludwig-Maximilians-Universitaet Muenchen, 85748 Garching (Germany); Institut fuer Photonik, Technische Universitaet Wien, Gusshausstr. 27, A-1040 Vienna (Austria); Milosevic, D.B. [Faculty of Science, University of Sarajevo, Zmaja od Bosne 35, 71000 Sarajevo (Bosnia and Herzegowina); Bauer, D. [Max-Planck-Institut fuer Kernphysik, Saupfercheckweg 1, 69117 Heidelberg (Germany); Becker, W. [Max-Born-Institut, Max-Born-Str. 2a, 12489 Berlin (Germany); Paulus, G.G. [Max-Planck-Institut fuer Quantenoptik, 85748 Garching (Germany); Ludwig-Maximilians-Universitaet Muenchen, 85748 Garching (Germany); Department of Physics, Texas A and M University, College Station, Texas 77843-4242 (United States)

    2005-07-22T23:59:59.000Z

    A new scheme for a double-slit experiment in the time domain is presented. Phase-stabilized few-cycle laser pulses open one to two windows (slits) of attosecond duration for photoionization. Fringes in the angle-resolved energy spectrum of varying visibility depending on the degree of which-way information are measured. A situation in which one and the same electron encounters a single and a double slit at the same time is observed. The investigation of the fringes makes possible interferometry on the attosecond time scale. From the number of visible fringes, for example, one derives that the slits are extended over about 500 as.

  11. Double beta decay: present status

    E-Print Network [OSTI]

    A. S. Barabash

    2008-07-18T23:59:59.000Z

    The present status of double beta decay experiments (including the search for $2\\beta^{+}$, EC$\\beta^{+}$ and ECEC processes) are reviewed. The results of the most sensitive experiments are discussed. Average and recommended half-life values for two-neutrino double beta decay are presented. Conservative upper limits on effective Majorana neutrino mass and the coupling constant of the Majoron to the neutrino are established as $ beta decay experiments with a sensitivity for the $$ at the level of (0.01-0.1) eV are considered.

  12. Neutrinoless double beta decay experiments

    E-Print Network [OSTI]

    K. Zuber

    2006-10-04T23:59:59.000Z

    The study of neutrinoless double beta decay is of outmost importance for neutrino physics. It is considered to be the gold plated channel to probe the fundamental character of neutrinos and to determine the neutrino mass. From the experimental point about nine different isotopes are explored for the search. After a general introduction follows a short discussion on nuclear matrix element calculations and supportive measurements. The current experimental status of double beta searches is presented followed by a short discussion of the ideas and proposals for large scale experiments.

  13. Neutrinoless Double Beta Decay Constraints

    E-Print Network [OSTI]

    Hiroaki Sugiyama

    2003-07-25T23:59:59.000Z

    A brief overview is given of theoretical analyses with neutrinoless double beta decay experiments. Theoretical bounds on the ``observable'', _betabeta, are presented. By using experimental bounds on _betabeta, allowed regions are obtained on the m_l-cos{2theta_12} plane, where m_l stands for the lightest neutrino mass. It is shown that Majorana neutrinos can be excluded by combining possible results of future neutrinoless double beta decay and {}^3H beta decay experiments. A possibility to constrain one of two Majorana phases is discussed also.

  14. Diagonal quantum circuits: their computational power and applications

    E-Print Network [OSTI]

    Yoshifumi Nakata; Mio Murao

    2014-08-04T23:59:59.000Z

    Diagonal quantum circuits are quantum circuits comprising only diagonal gates in the computational basis. In spite of a classical feature of diagonal quantum circuits in the sense of commutativity of all gates, their computational power is highly likely to outperform classical one and they are exploited for applications in quantum informational tasks. We review computational power of diagonal quantum circuits and their applications. We focus on the computational power of instantaneous quantum polynomial-time (IQP) circuits, which are a special type of diagonal quantum circuits. We then review an approximate generation of random states as an application of diagonal quantum circuits, where random states are an ensemble of pure states uniformly distributed in a Hilbert space. We also present a thermalizing algorithm of classical Hamiltonians by using diagonal quantum circuits. These applications are feasible to be experimentally implemented by current technology due to a simple and robust structure of diagonal gates.

  15. Regulation of mammalian neuronal circuit development by CPG 15

    E-Print Network [OSTI]

    Leslie, Jennifer H

    2012-01-01T23:59:59.000Z

    The orderly assembly of neuronal circuits is specified by developmental programs of gene expression, however, the final stage in circuit development, maturation and refinement of specific synaptic connections, is strongly ...

  16. accurate analog circuits: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The total size of each centroid circuit is 160m x 160m in a standard 1.2-m CMOS process. Paul M. Furth; Natalie Clark 1998-01-01 6 Low voltage analog circuit design...

  17. analog circuits macromodel: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The total size of each centroid circuit is 160m x 160m in a standard 1.2-m CMOS process. Paul M. Furth; Natalie Clark 1998-01-01 7 Low voltage analog circuit design...

  18. analog linear circuits: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The total size of each centroid circuit is 160m x 160m in a standard 1.2-m CMOS process. Paul M. Furth; Natalie Clark 1998-01-01 10 Low voltage analog circuit design...

  19. A Taxonomy of Rerouting in Circuit-Switched Networks

    E-Print Network [OSTI]

    Wong, Eric Wing-Ming

    A Taxonomy of Rerouting in Circuit-Switched Networks Eric W. M. Wong and Andy K. M. Chan, City presents a taxonomy of rerouting in circuit- switched networks showing the various ways rerouting can

  20. 6.301 Solid-State Circuits, Spring 2003

    E-Print Network [OSTI]

    Roberge, James

    This course covers analog circuit analysis and design, focusing on the tools and methods necessary for the creative design of useful circuits using active devices. The class stresses insight and intuition, applied to the ...

  1. Cryogenic direct current superconducting quantum interference device readout circuit

    E-Print Network [OSTI]

    Le Roy, Robert J.

    Cryogenic direct current superconducting quantum interference device readout circuit Michael Mück SQUID readout circuit, which can be operated at liquid helium temperatures. Although room electronics, and feedback coil as short as possible to minimize phase shifts and time delays. Cooling

  2. Protecting Circuits from Computationally Bounded and Noisy Leakage

    E-Print Network [OSTI]

    Faust, Sebastian

    Physical computational devices leak side-channel information that may, and often does, reveal secret internal states. We present a general transformation that compiles any circuit into a circuit with the same functionality ...

  3. IMPACT OF DYNAMIC VOLTAGE SCALING (DVS) ON CIRCUIT OPTIMIZATION

    E-Print Network [OSTI]

    Esquit Hernandez, Carlos A.

    2010-01-16T23:59:59.000Z

    Circuit designers perform optimization procedures targeting speed and power during the design of a circuit. Gate sizing can be applied to optimize for speed, while Dual-VT and Dynamic Voltage Scaling (DVS) can be applied to optimize for leakage...

  4. IMPACT OF DYNAMIC VOLTAGE SCALING (DVS) ON CIRCUIT OPTIMIZATION 

    E-Print Network [OSTI]

    Esquit Hernandez, Carlos A.

    2010-01-16T23:59:59.000Z

    Circuit designers perform optimization procedures targeting speed and power during the design of a circuit. Gate sizing can be applied to optimize for speed, while Dual-VT and Dynamic Voltage Scaling (DVS) can be applied ...

  5. An intuitive approach to quantum circuit simulation

    E-Print Network [OSTI]

    Sensarn, Steven

    2013-02-22T23:59:59.000Z

    for beginners in the field. A student may better understand an algorithm by visualizing each step and observing the state of the system over time. While there are many representations of a quantum algorithm, perhaps the most intuitive is the quantum circuit...

  6. Quantum computer of wire circuit architecture

    E-Print Network [OSTI]

    S. A. Moiseev; F. F. Gubaidullin; S. N. Andrianov

    2010-01-07T23:59:59.000Z

    First solid state quantum computer was built using transmons (cooper pair boxes). The operation of the computer is limited because of using a number of the rigit cooper boxes working with fixed frequency at temperatures of superconducting material. Here, we propose a novel architecture of quantum computer based on a flexible wire circuit of many coupled quantum nodes containing controlled atomic (molecular) ensembles. We demonstrate wide opportunities of the proposed computer. Firstly, we reveal a perfect storage of external photon qubits to multi-mode quantum memory node and demonstrate a reversible exchange of the qubits between any arbitrary nodes. We found optimal parameters of atoms in the circuit and self quantum modes for quantum processing. The predicted perfect storage has been observed experimentally for microwave radiation on the lithium phthalocyaninate molecule ensemble. Then also, for the first time we show a realization of the efficient basic two-qubit gate with direct coupling of two arbitrary nodes by using appropriate atomic frequency shifts in the circuit nodes. Proposed two-qubit gate runs with a speed drastically accelerated proportionally to the number of atoms in the node. The direct coupling and accelerated two-qubit gate can be realized for large number of the circuit nodes. Finally, we describe two and three-dimensional scalable architectures that pave the road to construction of universal multi-qubit quantum computer operating at room temperatures.

  7. Dendritic processing within olfactory bulb circuits

    E-Print Network [OSTI]

    Betz, William J.

    Dendritic processing within olfactory bulb circuits Nathan E. Schoppa1 and Nathan N. Urban2 1 of the olfactory bulb. How- ever, the mechanisms by which this map is transformed into an odor code by the bulb circuitry remain unclear. Recent physiological studies in bulb slices have ident- ified several synaptic

  8. Bioluminescent bioreporter integrated circuit detection methods

    DOE Patents [OSTI]

    Simpson, Michael L.; Paulus, Michael J.; Sayler, Gary S.; Applegate, Bruce M.; Ripp, Steven A.

    2005-06-14T23:59:59.000Z

    Disclosed are monolithic bioelectronic devices comprising a bioreporter and an OASIC. These bioluminescent bioreporter integrated circuit are useful in detecting substances such as pollutants, explosives, and heavy-metals residing in inhospitable areas such as groundwater, industrial process vessels, and battlefields. Also disclosed are methods and apparatus for detection of particular analytes, including ammonia and estrogen compounds.

  9. ECE 2100 Circuit Analysis Spring 2011

    E-Print Network [OSTI]

    Miller, Damon A.

    ECE 2100 Circuit Analysis Spring 2011 Exam #1 NAME analysis. #12;© 2011 Damon A. Miller Schematics drawn using LTspice IV (linear.com). Some problems might Schematics drawn using LTspice IV (linear.com). Some problems might be adapted from the course text

  10. Analysis of S-Circuit Uncertainty

    E-Print Network [OSTI]

    Ahmed, Taahir

    2011-08-08T23:59:59.000Z

    INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 viii LIST OF FIGURES FIGURE Page 1 Explanatory figures for Donald?s s-circuit example. . . . . . . . . . . . . 9 2 A representational s... Digraph representations of Donald?s beacon-compass reconfiguration and beacon-only reconfiguration. . . . . . . . . . . . . . . . . . . . . . . . . 30 8 The hardware implementations of the beacon emitter and receiver. . . . . 33 9 The hardware...

  11. Quadratic $?'$-Corrections to Heterotic Double Field Theory

    E-Print Network [OSTI]

    Kanghoon Lee

    2015-04-01T23:59:59.000Z

    We investigate $\\alpha'$-corrections of heterotic double field theory up to quadratic order in the language of supersymmetric O(D,D+dim G) gauged double field theory. After introducing double-vielbein formalism with a parametrization which reproduces heterotic supergravity, we show that supersymmetry for heterotic double field theory up to leading order $\\alpha'$-correction is obtained from supersymmetric gauged double field theory. We discuss the necessary modifications of the symmetries defined in supersymmetric gauged double field theory. Further, we construct supersymmetric completion at quadratic order in $\\alpha'$.

  12. Dual-circuit segmented rail phased induction motor

    DOE Patents [OSTI]

    Marder, Barry M. (Albuquerque, NM); Cowan, Jr., Maynard (Albuquerque, NM)

    2002-01-01T23:59:59.000Z

    An improved linear motor utilizes two circuits, rather that one circuit and an opposed plate, to gain efficiency. The powered circuit is a flat conductive coil. The opposed segmented rail circuit is either a plurality of similar conductive coils that are shorted, or a plurality of ladders formed of opposed conductive bars connected by a plurality of spaced conductors. In each embodiment, the conductors are preferably cables formed from a plurality of intertwined insulated wires to carry current evenly.

  13. Trust in analog : analog circuit techniques for reducing the risk of malicious circuits and software

    E-Print Network [OSTI]

    Kuznetsov, Eugene

    2011-01-01T23:59:59.000Z

    Malicious circuits and software present a significant security risk, especially in control applications. This work is concerned with increasing the trustworthiness of control circuitry by reducing its complexity. The ...

  14. Circuit design for embedded memory in low-power integrated circuits

    E-Print Network [OSTI]

    Qazi, Masood

    2012-01-01T23:59:59.000Z

    This thesis explores the challenges for integrating embedded static random access memory (SRAM) and non-volatile memory-based on ferroelectric capacitor technology-into lowpower integrated circuits. First considered is the ...

  15. Constraining neutrinoless double beta decay

    E-Print Network [OSTI]

    L. Dorame; D. Meloni; S. Morisi; E. Peinado; J. W. F. Valle

    2011-11-23T23:59:59.000Z

    A class of discrete flavor-symmetry-based models predicts constrained neutrino mass matrix schemes that lead to specific neutrino mass sum-rules (MSR). We show how these theories may constrain the absolute scale of neutrino mass, leading in most of the cases to a lower bound on the neutrinoless double beta decay effective amplitude.

  16. EEE 334 Circuits II (4) [F, S] Course (Catalog) description

    E-Print Network [OSTI]

    Zhang, Junshan

    : EEE334 contributes to engineering science through linear and non-linear circuit analysis, problem Prerequisites by Topic: Circuits I Course Objectives: Application of electric network theory to analysis and design of the fundamental non- linear circuits of transistor electronics. Course Outcomes: 1. Apply

  17. Foundations for a Circuit Complexity Theory of Sensory Processing

    E-Print Network [OSTI]

    Maass, Wolfgang

    with linear or almost linear total wire length. 1 Introduction Circuit complexity theory is a classical area in neuromorphic engineering, especially analog VLSI, and the analysis of neural circuits in biological organisms modules'' (i.e., as gates) in our complexity analysis. #12; plexity measures in traditional circuit

  18. Timed Verification of the Generic Architecture of a Memory Circuit

    E-Print Network [OSTI]

    Encrenaz-Tiphène, Emmanuelle

    #cient linear constraints relating the delays of the internal gates of the circuit to the exter­ nal delays on the reachability analysis of a timed model of the circuit (with additional abstract interpretation techniques [10Timed Verification of the Generic Architecture of a Memory Circuit Using Parametric Timed Automata

  19. Verification of the Generic Architecture of a Memory Circuit

    E-Print Network [OSTI]

    Encrenaz-Tiphène, Emmanuelle

    -Cortadella's parametric method for verifying asynchronous circuits, we formally derive a set of linear constraints of sufficient linear constraints relating the delays of the internal gates of the circuit to the external delays on the reachability analysis of a timed model of the circuit (with additional abstract interpretation techniques [11

  20. Circuit Complexity and Multiplicative Complexity of Boolean Functions

    E-Print Network [OSTI]

    no example of an explicit function requiring super linear circuit size. Moreover, only a few proofs of linear (usually by a long case analysis) that for any circuit computing this function setting some variablesCircuit Complexity and Multiplicative Complexity of Boolean Functions Arist Kojevnikov1