Powered by Deep Web Technologies
Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57 Fed Reg 15122) DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122) DOE revised the existing rule at 10 CFR part 1021, titled "Compliance with the National...

2

Final Report to DOE  

SciTech Connect

This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

Ismail Gultepe

2012-05-15T23:59:59.000Z

3

DOE Final Report  

SciTech Connect

This final report contains a summary of work accomplished in the establishment of a Climate Data Center at the International Arctic Research Center, University of Alaska Fairbanks.

Hinzman, Larry D.; Long, James; Newby, Greg B.

2014-01-08T23:59:59.000Z

4

Enforcement of DOE Classified Information Security Requirements Under Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of DOE Classified Information Security Requirements of DOE Classified Information Security Requirements Under Title 10, Code of Federal Regulations, Part 824 Enforcement of DOE Classified Information Security Requirements Under Title 10, Code of Federal Regulations, Part 824 In publishing 10 CFR Part 824, DOE has determined that civil penalties under Part 824 will only be assessed for violations of requirements for the protection of classified information (Restricted Data, Formerly Restricted Data and National Security Information). The rule does not include civil penalties relating to failure to protect sensitive but unclassified information. IMPLEMENTATION GUIDANCE More Documents & Publications Safety and Security Enforcement Process Overview Preliminary Notice, Battelle Energy Alliance, LLC, SEA-2011-01

5

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled  

NLE Websites -- All DOE Office Websites (Extended Search)

RFI 2010-11129 NBP RFI: Communications Requirements Titled RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" Grid Net, Inc. Comments on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy"

6

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

7

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

8

FINAL DOE IG Semiannl Rpt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INSPECTOR GENERAL INSPECTOR GENERAL SEMIANNUAL REPORT TO CONGRESS DOE/IG-0039 U.S. Department of Energy Office of Inspector General April 1, 2004 - September 30, 2004 Table of Contents Inspector General's Message . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Management Challenges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Contract Administration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Environmental Cleanup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Information Technology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 National Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10

9

DOE_FINAL_REPORT_newest  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Scientific/Technical Report Final Scientific/Technical Report October 1 2008 to June 30 2011 Heat Flow and Gas Hydrates on the Continental Margin of India: Building on Results from NGHP Expedition 01 Submitted by: College of Oceanic and Atmospheric Science Oregon State University Corvallis, OR 97331-5503 Principal Investigator: Anne Trehu Graduate Research Assistant: Peter Kannberg Prepared for: United States Department of Energy National Energy Technology Laboratory November 15, 2012 Oil & Natural Gas Technology 2 Disclaimer: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or

10

Real promise or false hope: DOE's title XVII loan Guarantee  

SciTech Connect

While the American Recovery and Reinvestment Act of 2009 expanded the DOE loan guarantee program to include certain ''shovel-ready'' projects, and appropriated $6 billion to cover the credit subsidy cost associated with these projects, it failed to resolve some of the most pressing problems facing the program. Here are some recommendations that may finally get some shovels in the ground. (author)

Massouh, Jennifer F.; Cannon, George D. Jr.; Logan, Suzanne M.; Schwartz, David L.

2009-05-15T23:59:59.000Z

11

Microsoft Word - Final DOE EA-1692  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RED RIVER ENVIRONMENTAL PRODUCTS, LLC FOR CONSTRUCTION AND START-UP OF AN ACTIVATED CARBON MANUFACTURING FACILITY IN RED RIVER PARISH, LOUISIANA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 June 2010 FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment DOE/EA- 1692 viii CONTENTS SUMMARY ..................................................................................................................................... i 1.0 Purpose and Need ............................................................................................................... 1 1.1 PURPOSE AND NEED FOR AGENCY ACTION .................................................................. 1

12

DOE/EA-1754 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PUBLIC SERVICE COMPANY OF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54 54 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PUBLIC SERVICE COMPANY OF NEW MEXICO PHOTOVOLTAIC PLUS BATTERY FOR SIMULTANEOUS VOLTAGE SMOOTHING AND PEAK SHIFTING PROJECT, BERNALILLO COUNTY, NEW MEXICO U.S. Department of Energy National Energy Technology Laboratory September 2010 DOE/EA-1754 FINAL ENVIRONMENTAL ASSESSMENT FOR THE PUBLIC SERVICE COMPANY OF NEW MEXICO PHOTOVOLTAIC PLUS BATTERY FOR SIMULTANEOUS VOLTAGE SMOOTHING AND PEAK SHIFTING PROJECT, BERNALILLO COUNTY, NEW MEXICO U.S. Department of Energy National Energy Technology Laboratory September 2010 DOE/EA-1754 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE or the Department) Title: Final Environmental Assessment for the Public Service Company of New Mexico

13

DOE Hydrogen Transition Analysis Workshop: Final Agenda | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Agenda DOE Hydrogen Transition Analysis Workshop: Final Agenda Agenda for the DOE Hydrogen Transition Analysis Workshop on January 26, 2006. transitionwkshpagenda.pdf More...

14

57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). DOE is also revoking its existing NEPA guidelines. This rule incorporates changes required by certain policy initiatives instituted by the Secretary of Energy to facilitate participation of the public and affected states in the NEPA process for proposed DOE actions. The rule also includes a revised and expanded list of typical classes of actions, including categorical

15

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for...

16

EIS-0423: DOE Notice of Availability of the Final Environmental...  

Office of Environmental Management (EM)

Final Environmental Impact Statement EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Notice...

17

EIS-0377: DOE Notice of Availability of the Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project The Western...

18

DOE Issues Final Site-Wide Environmental Impact Statement for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National...

19

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...  

Office of Environmental Management (EM)

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The...

20

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans.

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

FINAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for Exide Technologies Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Bristol, TN, and Columbus, GA

22

DOE/EIS-0283; Surplus Plutonium Disposition Final Environmental Impact Statement (11/1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 of 5 3 of 5 Volume II Final Environmental Impact Statement November 1999 DOE/EIS-0283 Surplus Plutonium Disposition Final Environmental Impact Statement Volume II United States Department of Energy Office of Fissile Materials Disposition November 1999 Cover Sheet Responsible Agency: United States Department of Energy (DOE) Title: Surplus Plutonium Disposition Final Environmental Impact Statement (SPD EIS) (DOE/EIS-0283) Locations of Candidate Sites: California, Idaho, New Mexico, North Carolina, South Carolina, Tennessee, Texas, Virginia, and Washington Contacts: For further information on the SPD Final EIS contact: For information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Ms. Carol Borgstrom, Director Office of Fissile Materials Disposition

23

DOE/EIS-0283; Surplus Plutonium Disposition Final Environmental Impact Statement (11/1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 of 5 2 of 5 Volume I - Part B Final Environmental Impact Statement November 1999 DOE/EIS-0283 Surplus Plutonium Disposition Final Environmental Impact Statement Volume I - Part B United States Department of Energy Office of Fissile Materials Disposition November 1999 Cover Sheet Responsible Agency: United States Department of Energy (DOE) Title: Surplus Plutonium Disposition Final Environmental Impact Statement (SPD EIS) (DOE/EIS-0283) Locations of Candidate Sites: California, Idaho, New Mexico, North Carolina, South Carolina, Tennessee, Texas, Virginia, and Washington Contacts: For further information on the SPD Final EIS contact: For information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Ms. Carol Borgstrom, Director

24

DOE Announces Final Rule for Loan Guarantee Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Rule for Loan Guarantee Program Final Rule for Loan Guarantee Program DOE Announces Final Rule for Loan Guarantee Program October 4, 2007 - 3:14pm Addthis Invites 16 Pre-Applicants to Submit Applications for Federal Support of Innovative Clean Energy Projects WASHINGTON, DC - Secretary of Energy Samuel W. Bodman today announced that the Department of Energy (DOE) has issued the final regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (EPAct). DOE's action today will pave the way for federal support of clean energy projects using innovative technologies and will spur further investment in these advanced energy technologies. DOE also today invited 16 project sponsors, who submitted pre-applications last Fall, to submit full applications for loan guarantees. These

25

DOE/EA-1753 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BEACON POWER CORPORATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1753 DOE/EA-1753 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BEACON POWER CORPORATION FLYWHEEL FREQUENCY REGULATION PLANT, CHICAGO HEIGHTS, ILLINOIS (SITE 1), AND HAZLE TOWNSHIP, PENNSYLVANIA (SITE 2) U.S. Department of Energy National Energy Technology Laboratory Arpil 2011 DOE/EA-1753 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BEACON POWER CORPORATION FLYWHEEL FREQUENCY REGULATION PLANT, CHICAGO HEIGHTS, ILLINOIS (SITE 1), AND HAZLE TOWNSHIP, PENNSYLVANIA (SITE 2) U.S. Department of Energy National Energy Technology Laboratory April 2011 DOE/EA-1753 iii April 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for the Beacon Power Corporation Flywheel Frequency Regulation Plant, Chicago Heights, Illinois (Site 1), and Hazle Township, Pennsylvania

26

DOE/EA-1861 FINAL ENVIRONMENTAL ASSESSMENT FOR THE FRITO-LAY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL FINAL ENVIRONMENTAL ASSESSMENT FOR THE FRITO-LAY BIOMASS BOILER PROJECT, BELOIT, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JULY 2011 DOE/EA-1861 iii July 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Assessment for the Frito-Lay Biomass Boiler Project, Beloit, Wisconsin (DOE/EA-1861) CONTACT: For more information about this Environmental Assessment (EA), please contact: Melissa Rossiter NEPA Document Manager U.S. Department of Energy Office of Energy Efficiency and Renewability Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 Facsimile: (720) 356-1560 E-mail: melissa.rossiter@go.doe.gov ABSTRACT: The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of

27

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE's power marketing activities, based on DOE's experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time, while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. 61 Fed Reg 64603: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222)

28

DOE Issues Final Request for Proposal for Oak Ridge Transuranic...  

Office of Environmental Management (EM)

Oak Ridge Transuranic Waste Processing Center Services DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services October 14, 2014 - 2:16pm...

29

DOE Finalizes New Rule to Protect Trade Secrets and Confidential...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trade Secrets and Confidential Business Information DOE Finalizes New Rule to Protect Trade Secrets and Confidential Business Information May 5, 2011 - 4:55pm Addthis The...

30

DOE Issues Final Rule for Alternative Efficiency Determination...  

Office of Environmental Management (EM)

Rating Methods DOE Issues Final Rule for Alternative Efficiency Determination Methods and Alternative Rating Methods December 26, 2013 - 12:00am Addthis The Department of Energy...

31

DOE Publishes Final Rule for Television Test Procedure | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Television Test Procedure DOE Publishes Final Rule for Television Test Procedure October 25, 2013 - 12:00am Addthis The Department of Energy has published a final rule regarding...

32

DOE Publishes Final Rule for Plumbing Products Test Procedures...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plumbing Products Test Procedures DOE Publishes Final Rule for Plumbing Products Test Procedures October 23, 2013 - 12:00am Addthis The Department of Energy has published a final...

33

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications...

34

DOE/EA-1745 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BLAST FURNACE GAS FLARE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BLAST FURNACE GAS FLARE CAPTURE PROJECT AT THE ARCELORMITTAL USA, INC. INDIANA HARBOR STEEL MILL, EAST CHICAGO, INDIANA U.S. Department of Energy National Energy Technology Laboratory August 2010 DOE/EA-1745 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BLAST FURNACE GAS FLARE CAPTURE PROJECT AT THE ARCELORMITTAL USA, INC. INDIANA HARBOR STEEL MILL, EAST CHICAGO, INDIANA U.S. Department of Energy National Energy Technology Laboratory August 2010 DOE/EA-1745 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for the Blast Furnace Gas Flare Capture Project at the ArcelorMittal USA, Inc. Indiana Harbor Steel Mill, East Chicago, Indiana

35

DOE/EIS-0283; Surplus Plutonium Disposition Final Environmental Impact Statement (11/1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 of 5 5 of 5 Final Environmental Impact Statement November 1999 Comment Response Document Volume III - Part B Cover Sheet Responsible Agency: United States Department of Energy (DOE) Title: Surplus Plutonium Disposition Final Environmental Impact Statement (SPD EIS) (DOE/EIS-0283) Locations of Candidate Sites: California, Idaho, New Mexico, North Carolina, South Carolina, Tennessee, Texas, Virginia, and Washington Contacts: For further information on the SPD Final EIS contact: For information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Ms. Carol Borgstrom, Director Office of Fissile Materials Disposition Office of NEPA Policy and Assistance U.S. Department of Energy Office of Environment, Safety and Health

36

DOE/EIS-0283; Surplus Plutonium Disposition Final Environmental Impact Statement (11/1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 of 5 4 of 5 Final Environmental Impact Statement November 1999 Comment Response Document Volume III - Part A Cover Sheet Responsible Agency: United States Department of Energy (DOE) Title: Surplus Plutonium Disposition Final Environmental Impact Statement (SPD EIS) (DOE/EIS-0283) Locations of Candidate Sites: California, Idaho, New Mexico, North Carolina, South Carolina, Tennessee, Texas, Virginia, and Washington Contacts: For further information on the SPD Final EIS contact: For information on the DOE National Environmental Policy Act (NEPA) process contact: Mr. G. Bert Stevenson, NEPA Compliance Officer Ms. Carol Borgstrom, Director Office of Fissile Materials Disposition Office of NEPA Policy and Assistance U.S. Department of Energy Office of Environment, Safety and Health

37

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE issued the Draft SEIS for public review and comment by mailings to stakeholders and by announcements in the Federal Register (FR) on November 5, 1999, (64 FR 60430) (Attachment 4 of Volume I) and on November 12, 1999 (64 FR 61635) correcting a document title (Attachment 5 of Volume I). On

38

DOE/EA-1875 FINAL ENVIRONMENTAL ASSESSMENT FOR THE JACKSON LABORATORY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75 75 FINAL ENVIRONMENTAL ASSESSMENT FOR THE JACKSON LABORATORY BIOMASS ENERGY CENTER PROJECT, BAR HARBOR, MAINE U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JUNE 2011 DOE/EA-1875 iii June 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Assessment for The Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine (DOE/EA-1875) CONTACT: For more information about this Environmental Assessment (EA), please contact: Melissa Rossiter NEPA Document Manager U.S. Department of Energy Office of Energy Efficiency and Renewability Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 Facsimile: (720) 356-1560 E-mail: melissa.rossiter@go.doe.gov

39

DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Final Mercury Storage Environmental Impact Statement: DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage January 19, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON - The Department of Energy has prepared a Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement to analyze the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven locations. Based on these factors, DOE identified the Waste Control Specialists, LLC, site near Andrews, Texas, as the preferred alternative for long-term management and storage of mercury. DOE will consider the environmental impact information presented in this

40

FINAL-west-doe-rfi-comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 31, 2013 Mr. Christopher Lawrence Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted electronically via email to: Christopher.Lawrence@hq.doe.gov Re: Department of Energy - Improving Performance of Federal Permitting and Review of Infrastructure Projects, Request for Information, 78 Fed. Reg. 53436 (Aug. 29, 2013) Dear Mr. Lawrence: I. INTRODUCTION Western Energy Supply and Transmission Associates ("WEST") 1 respectfully submits these comments in response to the questions raised in the above-referenced Department of Energy (DOE) Request for Information (RFI). This RFI addresses the proposed pre-application process for siting of transmission projects requiring interagency

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Microsoft Word - DOE Final ATWIR-2012.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

ANNUAL TRANSURANIC WASTE INVENTORY REPORT - 2012 ANNUAL TRANSURANIC WASTE INVENTORY REPORT - 2012 (Data Cutoff Date 12/31/2011) DOE/TRU-12-3425 Revision 0 Date: October 2012 U.S. Department of Energy Carlsbad Field Office DOE/TRU-12-3425 Page 1 of 421 This document has been submitted as required to: U.S. Department of Energy Office of Scientific and Technical Information PO Box 62 Oak Ridge, TN 37831 Phone: (865) 576-8401 Additional information about this document may be obtained by calling 1-800-336-9477. Unlimited, publicly available full-text scientific and technical reports produced since 1991 are available online at Information Bridge (www.osti.gov/bridge). U.S. Department of Energy and its contractors may obtain full-text reports produced prior to 1991 in paper form, for a processing fee, from:

42

Final Report for DOE Award ER25756  

SciTech Connect

The SciDAC-funded Center for Enabling Distributed Petascale Science (CEDPS) was established to address technical challenges that arise due to the frequent geographic distribution of data producers (in particular, supercomputers and scientific instruments) and data consumers (people and computers) within the DOE laboratory system. Its goal is to produce technical innovations that meet DOE end-user needs for (a) rapid and dependable placement of large quantities of data within a distributed high-performance environment, and (b) the convenient construction of scalable science services that provide for the reliable and high-performance processing of computation and data analysis requests from many remote clients. The Center is also addressing (c) the important problem of troubleshooting these and other related ultra-high-performance distributed activities from the perspective of both performance and functionality

Kesselman, Carl

2014-11-17T23:59:59.000Z

43

DOE Bottleneck Report-Final.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSORTIUM FOR ELECTRIC CONSORTIUM FOR ELECTRIC RELIABILITY TECHNOLOGY SOLUTIONS (CERTS) U.S. Department of Energy Transmission Bottleneck Project Report March 19, 2003 Prepared by Jim Dyer Electric Power Group Page 2 DOE TRANSMISSION BOTTLENECK PROJECT REPORT TABLE OF CONTENTS Executive Summary.......................................................................5 Section 1: Introduction...................................................................18 Section 2: Background and Definition.................................................19 Section 3: Study Methodology..........................................................21 Section 4: Results of CERTS' Survey of Independent System Operators Ø CAISO...................................................................21

44

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

45

DOE Solar Decathlon: 2007 Final Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Computer-generated image of the Technische Universität Darmstadt 2007 Solar Decathlon house. Computer-generated image of the Technische Universität Darmstadt 2007 Solar Decathlon house. First Place: Technische Universität Darmstadt Computer-generated image of the University of Maryland 2007 Solar Decathlon house. Second Place: University of Maryland Computer-generated image of the Santa Clara University 2007 Solar Decathlon house. Third Place: Santa Clara University Solar Decathlon 2007 Final Results The Solar Decathlon challenged 20 college and university teams to compete in 10 contests and design, build, and operate the most attractive and energy-efficient solar-powered home. After two years of preparation and a week of competition, the final scores and standings are in. Overall First Place: Technische Universität Darmstadt This team from Germany came to the Solar Decathlon hoping to have an impact

46

DOE in Final Months of NPR-3, RMOTC Sale  

Energy.gov (U.S. Department of Energy (DOE))

DOE is in the final months of activities related to selling resources, equipment and facilities at the governments only operating oilfield, Naval Petroleum Reserve-3, including the Rocky Mountain Oilfield Testing Center.

47

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unconventional Resources Unconventional Resources Technology Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 29, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Unconventional Resources Technology Advisory Committee Sub-Groups * Technology Transfer * Regulations * Water and Environmental Management * Production Research Themes

48

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 Fed Reg 36222) 61 Fed Reg 36222) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) DOE amended its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. These amendments also incorporate changes necessary to conform to recent changes in DOE's missions, programs, and policies that have evolved in response to changing national priorities since the current regulations were issued in 1992. 61 Fed Reg 36222: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications

49

DOE Issues Final RFP for Hanford Site Lab Services  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati -- The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab. A Draft RFP was previously released on February 28, 2014, requesting comments from industry.

50

DOE Technology TF Final-Jun  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Interim r eport o f T echnology T ransition T ask F orce to the S ecretary o f E nergy A dvisory B oard ( July 2 0, 2 011) DOE i s t he a gency r esponsible f or c reating, d emonstrating, a nd e ncouraging d eployment of e nergy t echnology t hat p rovides r eliable a nd a ffordable e nergy necessary f or a growing e conomy a nd p ersonal u se w ithout a dverse e nvironmental e ffects. E nergy security a nd i mproving e conomic c ompetitiveness a re i mportant a dditional g oals. T he basic p rinciple t hat s hould g overn D OE's i nvolvement i s t hat D OE e ngages w hen t he private s ector i s u nable o r u nwilling t o m ake i nvestments t hat a re i n t he p ublic's interest. There a re f our s tages a t w hich g overnment s upport c an o ccur: ( 1) creation o f n ew i deas (basic r esearch a nd e xploratory d evelopment), ( 2)

51

Microsoft Word - Oneida Waste to Energy Project DOE Final EA 1862  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ONEIDA SEVEN GENERATIONS ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office NOVEMBER 2011 DOE/EA-1862 FINAL ENVIRONMENTAL ASSESSMENT FOR THE ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office NOVEMBER 2011 DOE/EA-1862 DOE/EA-1862 iii November 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Environmental Assessment for Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin (DOE/EA-1862) CONTACT: For more information on this Environmental Assessment (EA), please contact:

52

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2000 Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement (DOE/EIS-0279) CONTACT: For additional information on this environmental impact statement, write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office, Building 742A, Room 183

53

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ultra-Deepwater Advisory Ultra-Deepwater Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Ultra-Deepwater Advisory Committee Sub-Groups * R&D Theme Content * Solicitation Process * Environmental * Access Strategic Center for Natural Gas and Oil UDAC Recommendations for 2007 Plan

54

DOE Issues Final Appliance Test Procedure Rule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Test Procedure Rule Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the foundation for standards that will help bring more energy efficient options to the marketplace and result in energy savings for all Americans," said DOE Assistant Secretary for Energy Efficiency and Renewable Energy Andy Karsner. The final rulemaking, which appears in today's Federal Register, will

55

DOE Publishes Final Rule Regarding Post-Employment Restrictions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publishes Final Rule Regarding Post-Employment Restrictions Publishes Final Rule Regarding Post-Employment Restrictions DOE Publishes Final Rule Regarding Post-Employment Restrictions December 3, 2010 - 6:31pm Addthis The Department of Energy published a final rule establishing procedures under which a former employee of the executive branch may obtain approval to make communications to DOE solely for the purpose of furnishing scientific or technological information during the period the former employee is subject to post-employment restrictions set forth in 18 U.S.C. 207(a), (c), and (d). The post-employment restrictions for Federal employees are set forth in 18 U.S.C § 207 and prohibit former employees from engaging in certain activities on behalf of persons or entities other than the United States, regardless of compensation. Section 207(j)(5),

56

DOE Publishes Final Rule Regarding Post-Employment Restrictions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publishes Final Rule Regarding Post-Employment Restrictions Publishes Final Rule Regarding Post-Employment Restrictions DOE Publishes Final Rule Regarding Post-Employment Restrictions December 3, 2010 - 6:31pm Addthis The Department of Energy published a final rule establishing procedures under which a former employee of the executive branch may obtain approval to make communications to DOE solely for the purpose of furnishing scientific or technological information during the period the former employee is subject to post-employment restrictions set forth in 18 U.S.C. 207(a), (c), and (d). The post-employment restrictions for Federal employees are set forth in 18 U.S.C § 207 and prohibit former employees from engaging in certain activities on behalf of persons or entities other than the United States, regardless of compensation. Section 207(j)(5),

57

DOE/EIS0247; Final Environmental Impact Statement Construction and Operation of the Spallation Neutron Source  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SNS FEIS SNS FEIS Cover Sheet COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement (FEIS), Construction and Operation of the Spallation Neutron Source (DOE/EIS-0247) LOCATIONS OF ALTERNATIVE SITES: Illinois, New Mexico, New York, and Tennessee. CONTACT: For further information on this document, write or call: Mr. David Wilfert, EIS Document Manager Oak Ridge Operations Office U.S. Department of Energy 200 Administration Road, 146/FEDC Oak Ridge, TN 37831 Telephone: (800) 927-9964 Facsimile: (423) 576-4542 E-mail: NSNSEIS@ornl.gov Mr. Jeff Hoy, SNS Program Manager Office of Basic Energy Research U.S. Department of Energy (ER-10) Germantown, MD 20874 Telephone: (301) 903-4924 Facsimile: (301) 903-9513 E-mail: Jeff.Hoy@mailgw.er.doe.gov

58

PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (DOE/EIS-0171)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement (DOE/EIS-0171) Statement (DOE/EIS-0171) file:///I|/Data%20Migration%20Task/EIS-0171-FEIS-1994/01.htm[6/27/2011 10:47:34 AM] PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (DOE/EIS-0171) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: PacifiCorp Capacity Power Sale Contract States and Provinces Involved: Washington, Oregon, Idaho, Montana, Wyoming, Utah, Colorado, New Mexico, California, Nevada, Arizona, British Columbia. Abstract: The Bonneville Power Administration (BPA) has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of firm power customers, pursuant to the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power

59

FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology  

E-Print Network (OSTI)

Collaborative Abby Arnold, Executive Director, American Wind Wildlife Institute,aarnold@awwi.org, 202- 535-7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institutei FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development

Sandercock, Brett K.

60

DOE Issues Final Environmental Impact Statement for Moab, Utah Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for Moab, Utah Site Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its final environmental impact statement (EIS) for the Moab Uranium Mill Tailings Remedial Action Project Site, located on the bank of the Colorado River. The EIS details the preferred option of removal of the tailings pile and contaminated materials, along with ground water remediation. The tailings will be moved, predominately by rail, to the proposed Crescent Junction, Utah, site, more than 30 miles from the Colorado River. "Taking all facts into account, we believe the recommendations issued today provide the best solution to cleaning up Moab and protecting the River,"

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

TITLE  

Office of Legacy Management (LM)

Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix....

62

TITLE  

Office of Legacy Management (LM)

Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix...

63

Title  

National Nuclear Security Administration (NNSA)

does it reflect the efforts of James L. Reveal, University of Maryland and the Smith- sonian Institution, whose contributions began with the first intensive plant...

64

U.S. Department of Energy DOE/EA-1728-F Final Environmental Assessment F-1 February 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1728-F DOE/EA-1728-F Final Environmental Assessment F-1 February 2012 APPENDIX F FINDING OF NO SIGNIFICANT IMPACT ENVIRONMENTAL ASSESSMENT FOR INTEGRATED VEGETATION MANAGEMENT ON THE HANFORD SITE, RICHLAND, WASHINGTON (DOE/EA-1728) AGENCY: U.S. Department of Energy, Richland Operations Office ACTION: Finding of No Significant Impact SUMMARY An Environmental Assessment (EA) for Integrated Vegetation Management on the Hanford Site, Richland, Washington (DOE/EA-1728) has been prepared by the U.S. Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA); the Council on Environmental Quality's Regulations for Implementing the Procedural Provisions of NEPA (Title 40, Code of Federal Regulations [CFR], Parts 1500-1508); and DOE's National Environmental Policy Act Implementing

65

OC)elRM(o-T/^ DOE/PC/60810-TIO TITLE: Superacid Catalyzed Coal Conversion Chemistry DE86 015045  

NLE Websites -- All DOE Office Websites (Extended Search)

OC)elRM(o-T/^ OC)elRM(o-T/^ DOE/PC/60810-TIO TITLE: Superacid Catalyzed Coal Conversion Chemistry DE86 015045 PIs(Authors): George A. Olah INSTITUTION/ORGANIZATION UNIVERSITY OF SOUTHERN CALIFORNIA HYDROCARBON RESEARCH INSTITUTE CONTRACT NO.: FINAL TECHNICAL REPORT (213)743-5277 DE-FG22-83PC60810 September 1,1983-September 1,1986 The basis of our studies was a novel, low temperature, mild coal conversion process developed in our laboratory. It involves the use of a superacidic system consisting of HF and BF, in the presence of hydrogen and/or a hydrogen donor solvent. In order to understand the chemistry involved in the process of hydrodepolyme- rization of coal by HF:BF2:H2 system a systematic study of a number of coal model compounds was carried out under identical conditions. The model compounds studied

66

TITLE  

Office of Legacy Management (LM)

conference. The final Sampling and Quality Assurance Plans shall be approved by the Contracting Officer prior to commencement of field work. 7 . 0 FIELDWORK The Contractor shall...

67

DOE/EIS-0146 FINAL PROGRAMMATIC ENVIRONMENTAL IMPACr STATEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

146 146 FINAL PROGRAMMATIC ENVIRONMENTAL IMPACr STATEMENT CLEAN COAL TECHNOLOGY DEMONSTRATION PROGRAM NOVEMBER 1989 U.S. DEPARTMENT OF ENERGY Washington, D.C. 20585 CovERsm LEAD AGENCY U.S. Department of Energy (DOE) COOPERATING AGENCIES None November 1989 Final Programmatic Environmental Impact Statement (PEIS), Clean Coal Demonstration Program Technology Additional copies or information concerning this final PEIS can be obtained from Allyn Hemenway FE-222, Office of Clean Coal Technology, U.S. Department of Energy, Washington, D.C. 20585. Telephone: (202) 586-7162. ABsmAcr The proposed action evaluated in this PEIS is to continue the Clean Coal Technology Demonstration Program (CCTDP) involving the selection, for cost-shared federal funding, of one

68

DOE/EIS-0146 FINAL PROGRAMMATIC ENVIRONMENTAL IMPACr STATEMENT  

NLE Websites -- All DOE Office Websites (Extended Search)

146 146 FINAL PROGRAMMATIC ENVIRONMENTAL IMPACr STATEMENT CLEAN COAL TECHNOLOGY DEMONSTRATION PROGRAM NOVEMBER 1989 U.S. DEPARTMENT OF ENERGY Washington, D.C. 20585 CovERsm LEAD AGENCY U.S. Department of Energy (DOE) COOPERATING AGENCIES None November 1989 Final Programmatic Environmental Impact Statement (PEIS), Clean Coal Demonstration Program Technology Additional copies or information concerning this final PEIS can be obtained from Allyn Hemenway FE-222, Office of Clean Coal Technology, U.S. Department of Energy, Washington, D.C. 20585. Telephone: (202) 586-7162. ABsmAcr The proposed action evaluated in this PEIS is to continue the Clean Coal Technology Demonstration Program (CCTDP) involving the selection, for cost-shared federal funding, of one

69

DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here to return to the Main Menu here to return to the Main Menu Volume I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Summary COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information concerning the Final Site-Wide Environmental Impact Statement (SWEIS), contact Julianne Levings, NEPA Document Manager U.S. DOE, Albuquerque Operations Office P.O. Box 5400, Albuquerque, NM 87185 Telephone: 1-888-635-7305, Fax: 505-845-6392 For further information by way of electronic mail, contact

70

Microsoft Word - DOE EA 1939-Final EA CCET Wind Energy at RTC _04-09-13_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR THE CENTER FOR COMMERCIALIZATION OF ELECTRIC TECHNOLOGY (CCET), REESE TECHNOLOGY CENTER (RTC) WIND AND BATTERY INTEGRATION PROJECT, LUBBOCK COUNTY, TEXAS U.S. Department of Energy National Energy Technology Laboratory APRIL 2013 DOE/EA-1939 FINAL ENVIRONMENTAL ASSESSMENT FOR THE CENTER FOR COMMERCIALIZATION OF ELECTRIC TECHNOLOGY (CCET), REESE TECHNOLOGY CENTER (RTC) WIND AND BATTERY INTEGRATION PROJECT, LUBBOCK COUNTY, TEXAS U.S. Department of Energy National Energy Technology Laboratory APRIL 2013 DOE/EA-1939 DOE/EA-1939 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for the Center for Commercialization of Electric Technology (CCET), Reese Technology Center (RTC) Wind and Battery Integration Project,

71

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Upcoming DOE's Upcoming 2012 Congestion Study Keith White California Public Utilities Commission December 15, 2011 2 General Comments ◊ California has been fully participating in west-wide "economic" transmission studies (TEPPC since 2006, recently with much-appreciated ARRA funding) ◊ The 2005 Energy Policy Act gives DOE unclear scope regarding "congestion," and a requirement to consult with states. The following are essential: * Clearly address the specific rationale for transmission: reliability, economic efficiency, resource priorities; * If considering potential future congestion* contingent on certain conditions, fully consider the likelihood of those conditions and the consistency with state energy policies and actual market developments.

72

DOE/EIS-0289, Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project (June 1, 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA June 2000 U.S. DEPARTMENT OF ENERGY COVER SHEET June 2000 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this final environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@netl.doe.gov.

73

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients July, 2010 For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

74

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

75

ABSTRACT FINAL ID: SH51A-1991 TITLE: Three-Dimensional Numerical Simulations of Interaction Between Flux Ropes in the  

E-Print Network (OSTI)

ABSTRACT FINAL ID: SH51A-1991 TITLE: Three-Dimensional Numerical Simulations of Interaction Between, United States. Title of Team: ABSTRACT BODY: We have recently identified in three-dimensional (3D implications in the generation of Alfven waves and MHD turbulence. This work is supported by a NASA grant NNX08

Ng, Chung-Sang

76

DOE/EA=O995 Final ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA=O995 DOE/EA=O995 Final ENVIRONMENTAL ASSESSMENT and FINDING-OF-NO-SIGNIFIC ANT-IMPACT Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations United States Department of Energy Rocky Flats Environmental Technology Site Golden, Colorado September 1994 DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

77

Report Title: The Economic Impact of Coal Mining in New Mexico Type of Report: Final Technical Report  

E-Print Network (OSTI)

presented. Historical coal production, reserves, and price data are also presented and discussed ......................................................................................16 Coal Prices........................................................Report Title: The Economic Impact of Coal Mining in New Mexico Type of Report: Final Technical

Johnson, Eric E.

78

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Value Propositions for Four Value Propositions for Four Modular Electricity Storage Demonstrations in California EESAT 2007 San Francisco by Distributed Utility Associates, Inc. Jim Eyer, Senior Analyst jim@dua1.com Susan Horgan, President susan@dua1.com Funded by the Energy Storage Systems Program of the U.S. Department Of Energy (DOE/ESS) through Sandia National Laboratories (SNL). EESAT 2007 - Eyer - DUA 2 Agenda * Scope * Background * Assessing Value Propositions * Supercapacitor for Sacramento Light Rail * Supercapacitor for Load & DG Integration * Flow Battery for T&D Deferral * Flywheel for Area Regulation * Outlook EESAT 2007 - Eyer - DUA 3 Scope * DOE ESS partnership with CEC/PIER - innovative electricity storage demonstrations in California that are sponsored by CEC/PIER * DUA: Evaluation and Report

79

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

James Bennett National Energy Technology Laboratory - USDOE E-Mail: james.bennett@netl.doe.gov Phone: 541-967-5983 Research Efforts at NETL to Improve Gasifier Performance GTC 2013, Colorado Springs, CO - Oct 13-16, 2013 CSC Fouling Refractory/TC Wear RSC Fouling Syngas Cleanup OUTLINE - Research Objectives - Program Overview - Materials Research Focus (Refractories) * Scope of work * Impact to date * Long range goals - Industrial Involvement - Summary/Disclaimer 3 Advanced Gasification Spalling Corrosion Goals: increase gasifier efficiency, reduce capital and operational costs, reduce cost of electricity, develop predictive gasifier models, meet/exceed EPA emission targets, and increase carbon feedstock flexibility (including U.S. low rank coals)

80

TITLE  

Office of Legacy Management (LM)

Sensitive Species Survey Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 & \ Environmental Restoration Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado Prepared for: U.S. Department of Energy Environmentaf Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared by: IT CORPORATION 4330 S. Valley View BIvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No. DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n ... List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction .

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

TITLE  

Office of Legacy Management (LM)

Floodplains and Wetlands Floodplains and Wetlands Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 Environmental Restoration Floodplains and Wetlands Survey Results tor the Rulison and Rio Blanco Sites, Colorado Prepared For: U.S. Department of Energy Environmental Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared By: l T CORPORATION 4330 S. Valley View Blvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No: DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

82

TITLE  

Office of Legacy Management (LM)

Verification Verification Survey at B&T Metals, 425 West Town Street, Columbus, Ohio M. E. Murray V. P. Patania C. A. Johnson This report h s ken rcpmduccd directly from the t f s i avail3ble copy. Avaihble to DOE and DOE c o n m u x s from the Olficc of Scienlific and Technical inlormaliar. P.O. Boa 6 1 . W Ridsee. l X 378331: priccsav&lable from (6t5) 576-8101, TTS 6268401. A v ~ i t b I e t o h e public lmm the Naliorul Technical Inlormalion Service. U.S. Dcpvtmenl 01 Commcrcc. 5285 Pon Royal Rd.. Springlield. VA 22161. This rcpon was prep& as an account o f work sponsored by an agency o f thc Unircd Sutcs Govcmmcnr. X c i h c ~ thc Uniicd Sulcs Govcrnmcn~ nor any ;Igcncy, Lhcrcol. nor any of theu crnployccs, mikes my warmly. cxprcss, or implicd.or assumcs my legal l i i i l

83

TITLE  

Office of Legacy Management (LM)

SHOAL AREA SHOAL AREA TRACER TEST EXPERlIMENT prepared by Rosemary Carrolt, Todd Mihevc, Greg Pohll, Brad Lyles, Sean Kosinski and Rich Niswonger submitted to Nevada Operations Office U.S. Department of Energy Las Vegas, Nevada NOVEMBER 2000 Publication No. 45177 Reference herein to any specific commercial pmduct, process, or service by trade name, trademark, mufacturer, or otherw~se, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. The views a d opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. This report has been reproduced directly from the best available copy.

84

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

85

TITLE  

Office of Legacy Management (LM)

1 111II1111111111111111111111111 1 111II1111111111111111111111111 GSB WW06 Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 y :DOE Nevada Operations Office Las Vegas. Nevada 89 193-85 18 Prepared by: I T CORPORATION 4330 S . Valley View Blvd., Suite 114 Las Vegas, Nevada 89103 Work Performed under Contract No.

86

TITLE  

Office of Legacy Management (LM)

Ill lllIlllllllllllllllllllllllIII1 Ill lllIlllllllllllllllllllllllIII1 SHL 000035 Letter Report Contaminant Boundary at the Shoal Underground Nuclear Test prepared by Greg Pohll and Karl Pohlmann Division of Hydrologic Sciences Desert Research Institute University and Community College System of Nevada submitted to Nevada Sitc O f i c e National Nuclear Security Administration U.S. Deparuncnt of Enagy Las Vegas, Nevada August 6,2004 The work upon which this report is based was suppomd by the U.S. Department of Energy under Contract #DE-AC52-OONVI3609; intended for limited distribution. Reference herein to any specific commercial product, process, or service by trade name, trademark, n~anuC;lcturcr, or otherwise, does not necussuily constitute or imply its endorsement, recommendation, 01. favoring by the Unitcd States Govcmmcnl or any agcncy thereof ur its

87

TITLE  

Office of Legacy Management (LM)

68 68 OFF C . 2 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 . I \ . j Environmental Restoration Sensitive Species Su wey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1 993 Environmental Restoration 1 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico Prepared for: U.S. Deparunenr of Energy Environmental Restoration Division DOE Nevada Operations Officc Las Vegas, Nevada 89193-851 8 Prepared by: I T CORPORATION 4330 S. Valley View Blvd.. Suite 114 Las Vegas, Nevada 89 103 Work Pcrformcd undcr Contract No. DE-AC08-92NV10972 Table of Contents List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii ... List of Tables . . . . . . . . . . .

88

TITLE  

Office of Legacy Management (LM)

CHAPTER lV CHAPTER lV 1. PURPOSE. This chapter presents radiological protection requirements and guidelines for cleanup of residual radioactive material and management of the resulting wastes and residues and release of property. These requirements and guidelines are applicable at the time the property is released. Property subject to these criteria indudes, but is not limited to sacs identied by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). The topics covered are basic dose limits, guidelines and authorized limits for allowable levels of residual radioadive material, and control of the radioactive wastes and residues. This chapter does not apply to uranium mill tailings or to properties covered by mandatory legal requirements.

89

TITLE  

Office of Legacy Management (LM)

Date: 11/21/35 10:12:16 AM Date: 11/21/35 10:12:16 AM 136930 From: HARTMANGSOoro.doe.gov Subject: Re: CX Determination - B&T Metals Removal Action (FUSRAP-036 HOW about this! This is the first CX determination that we have done electronically - - - same-day turnaround!!! Gary Forwarding routing: Les Price, PSRD Bill Seay, FSRD Dave Adler, PSRD Loren Marz, PSRD Gerry Palau. BNI Dave Sexton, BNI Teresa Noe, BNI (PDCC) Forward Header :~Liject: Re: CX Determination - B&T Metals Removal Action (PUSPAP-036 i~thor: PHILLIPSPW at SE31 8 s 1-5 : 11/21/95 12:OO PM Based on the recommendation of Gary Hartman, Environmental Scientist, EW93, I determine that the subject proposed action is categorically excluded from further NEPA review and documentation. Patricia W. Phillips

90

TITLE  

Office of Legacy Management (LM)

. . · MONTICELLO NPL SITES FFA QUARTERLY REPORT: January 1- March 31, 2007 DOE Site Manager: Jalena Maestas 1.0 MMTS Activities/Status Repository and Pond 4 * Monthly and quarterly inspection of the repository identified no problems other than shrub damage by voles (inspection checklists attached). * Monthly inspection of Pond 4 identified no unacceptable conditions. * Pond 4 leachate detection and removal systems operated at normal levels (leachate pumping summary attached). * Repository leachate collection and removal system (LCRS) and leachate collection system (LDS) operated at normal levels (leachate pumping summary attached). * Equipment purchased to upgrade repository LCRS and LDS remote sensing and telemetry system. * Portions of repository cover were manually re-seeded with desirable shrubs to repair areas

91

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2000 Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement (DOE/EIS-0279) CONTACT: For additional information on this environmental impact statement, write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office, Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Spent Nuclear Fuel Management EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@SRS.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm. For general information on the process that DOE follows in complying with the National Environmental Policy Act, write or call:

92

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement (DOE/EIS-0279) CONTACT: For additional information on this environmental impact statement, write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office, Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Spent Nuclear Fuel Management EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@SRS.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm. For general information on the process that DOE follows in complying with the National Environmental Policy Act, write or call:

93

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

NLE Websites -- All DOE Office Websites (Extended Search)

Cover Sheet Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement (DOE/EIS-0279) CONTACT: For additional information on this environmental impact statement, write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office, Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Spent Nuclear Fuel Management EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@SRS.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm. For general information on the process that DOE follows in complying with the National Environmental Policy Act, write or call:

94

DOE Issues Finding of No Significant Impact and Final Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear

95

Final Report for the DOE Metal Hydride Center of Excellence  

NLE Websites -- All DOE Office Websites (Extended Search)

SANDIA REPORT SANDIA REPORT SAND2012-0786 Unlimited Release Printed February 2012 Final Report for the DOE Metal Hydride Center of Excellence Lennie Klebanoff Director, Metal Hydride Center of Excellence Jay Keller Deputy Director, Metal Hydride Center of Excellence Prepared by Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Approved for public release; further dissemination unlimited. Issued by Sandia National Laboratories, operated for the United States Department of Energy

96

Microsoft Word - DOE Final Report-July 13.doc  

Office of Scientific and Technical Information (OSTI)

Dewatering Aids Dewatering Aids for Minerals and Coal Fines by Roe-Hoan Yoon, Ramazan Asmatulu, Ismail Yildirim, William Jansen, Jinming Zhang, Brad Atkinson, and Jeff Havens The Final Report to United States Department of Energy for Project Period During January 2001 to January 2004 DOE Award Number, DE-FC26-01NT41053 Mineral and Coal Technologies (MCT) Inc. 1800 Kraft Drive, Suite 106 Blacksburg, VA 24060 Report Issued July 2004 2 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

97

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

98

TITLE  

Office of Legacy Management (LM)

p p a * T A olistii. ..ow ... Unlted States awernment 00))#~Tmsnt of Energy - - memorandum D*=APR 0 2 1987 muym NE-23 A m OR W C I : Revised Guidelines f o r Resldual R a d ~ o a c t i v e M a t e r i a l a t N S R A P and R e m t e SRIP S l t e s Ahrends, OR Kluk, OP-124 Nelson, WSSPd Schrelber , SSDPD Welty, EH-23 G I l b e r t , MIL Berven, ORHL Berger, ORAL! Young, Aerospace Attached I s a revjsed copy o f thc Department's Guidelines f o r n s l d u a l r a d l o a c t f v e material. This versfon o f the doculnent has been revised t o i n c l u d e comnents from EH and t o address the h o t spot and s u p p l m n t a l . I i m l t/except{ons procedures out1 i n e d during t h e July 1906 workshop and subsequent working group meetings. EH intends t o include these guidelines i n d r a f t DOE Order 5480.x~. R a d i a t i o n P r o t e c t i o n o f t h e Publlc and

99

2002 DOE Final Inherently Governmental and Commercial Activities...  

Office of Environmental Management (EM)

Inherently Governmental and Commercial Activities Inventory More Documents & Publications DOE FAIR 2007 (OMB).xls 2003 DOE IGCA Inventory Data for web.xls&0; OMBDOEFAIR2005.xls...

100

EA-0387: DOE Notice of Availability of the Final Site-Wide Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

87: DOE Notice of Availability of the Final Site-Wide 87: DOE Notice of Availability of the Final Site-Wide Environmental Impact Statement EA-0387: DOE Notice of Availability of the Final Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the Department of Energy (DOE), announces the availability of the Final Site-Wide Environmental Impact Statement for the Y-12 National Security Complex (Final Y-12 SWEIS, DOE/EIS-0387). National Nuclear Security Administration Notice of Availability of the Final Site-Wide Environmental Impact Statement for the Y-12 National Security Complex, DOE/EA-0387 (March 2011) 76 FR 12103 More Documents & Publications EIS-0387: Record of Decision EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0391: DOE Notice of Availability of a Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of a Final Environmental DOE Notice of Availability of a Final Environmental Impact Statement EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Richland, WA DOE announces the availability of its Final Tank Closure and Waste Management EIS for the Hanford Site, Richland, Washington (Final TC & WM EIS, DOE/EIS-0391), prepared pursuant NEPA. This Final EIS addresses all public comments on the Draft TC & WM EIS, which was issued in October 2009, and identifies DOE's preferred alternatives. EIS-0391-FEIS-DOENOA-2012.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-387 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012 EIS-0391: EPA Notice of Availability of a Final Environmental Impact

102

EIS-0226: DOE Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: DOE Notice of Availability of the Final Environmental 6: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) announces the availability of the Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226) (referred to as the Final Decommissioning and/or Long-Term Stewardship EIS or ''Final EIS''). DOE/EIS-0226, Notice of Availability of the Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West

103

EIS-0391: DOE Notice of Availability of a Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0391: DOE Notice of Availability of a Final Environmental EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Richland, WA DOE announces the availability of its Final Tank Closure and Waste Management EIS for the Hanford Site, Richland, Washington (Final TC & WM EIS, DOE/EIS-0391), prepared pursuant NEPA. This Final EIS addresses all public comments on the Draft TC & WM EIS, which was issued in October 2009, and identifies DOE's preferred alternatives. EIS-0391-FEIS-DOENOA-2012.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-387 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012

104

EIS-0226: DOE Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Final Environmental DOE Notice of Availability of the Final Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) announces the availability of the Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226). EIS-0226-FEIS-NOA-2010.pdf More Documents & Publications EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement

105

Final Report for the DOE Metal Hydride Center of Excellence  

Energy.gov (U.S. Department of Energy (DOE))

This technical report describes the activities carried out, key accomplishments, and recommendations from the DOEs Chemical Hydrogen Storage Center of Excellence, led by Los Alamos National Laboratory with Pacific Northwest National Laboratory from 2005 through 2010.

106

DOE Hydrogen Transition Analysis Workshop: Final Attendees List  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

directedtechnologies.com Fred Joseck U.S. DOE-HFCIT fred.joseck@ee.doe.gov Gregory Keenan Air Products & Chemicals, Inc. keenangr@airproducts.com Edward Kiczek Air Products &...

107

DOE/EA-1607 FINAL ENVIRONMENTAL ASSESSMENT DISPOSITION OF DOE EXCESS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

µCi/cc microcuries per cubic centimeter µCi/cc microcuries per cubic centimeter MAP mitigation action plan MEI maximally exposed individual mg/kg milligrams per kilogram mrem millirem mSv millisievert MT metric ton MTCA Model Toxics Control Act MTU metric tons of uranium N/A not applicable Final Environmental Assessment: Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium vi NAAQS National Ambient Air Quality Standards NEF National Enrichment Facility NEPA National Environmental Policy Act NRC U.S. Nuclear Regulatory Commission NU natural uranium NUF 6 natural uranium hexafluoride pCi/g picocuries per gram PEIS programmatic environmental impact statement PM 2.5 particulate matter with a diameter of 2.5 microns or less PM 10 particulate matter with a diameter of 10 microns or less

108

W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

W.A. W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project Final Environmental Impact Statement Summary February 2013 DOE/EIS-0473 Office of Fossil Energy National Energy Technology Laboratory INTENTIONALLY LEFT BLANK COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Title: W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473) Location: Southeastern Texas, including Fort Bend, Wharton, and Jackson counties Contacts: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act, contact: Mark W. Lusk U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road Morgantown, WV 26507-0880 (304) 285-4145 or Mark.Lusk@netl.doe.gov

109

EIS-0403: DOE and BLM Notice of Availability of the Final Programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Final Programmatic Environmental Impact Statement EIS-0403: DOE and BLM Notice of Availability of the Final Programmatic Environmental Impact Statement Final Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) The Bureau of Land Management (BLM) and the Department of Energy (DOE) (the Agencies) as joint lead agencies announce the availability of the Final Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern States (Final Programmatic EIS) (BLM/DES 11-49, DOE/EIS-0403) and associated Proposed BLM Resource Management Plan (RMP) Amendments. EIS-0403-DOE-BLM-NOA-FEIS-2012.pdf More Documents & Publications EIS-0403-S1: DOE and BLM Notice of Availability of the Supplement to the

110

Bond Renewal Final Notice, Extension of DOE N 470.5 - September 28, 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bond Renewal Final Notice, Extension of DOE N 470.5 - September 28, Bond Renewal Final Notice, Extension of DOE N 470.5 - September 28, 2011 Bond Renewal Final Notice, Extension of DOE N 470.5 - September 28, 2011 September 28, 2011 Effective immediately, DOE N 470.5, Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, dated 8-12-09 is extended until 9-28-11 Effective immediately, DOE N 470.5, Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, dated 8-12-09 is extended until 9-28-11. Requirements in the Notice will be integrated into a new DOE Order, Personnel Security, which is currently under development. Direct inquiries concerning the extension to Stephanie Brewer, (202) 586-3249. BY ORDER OF THE SECRETARY OF ENERGY Bond Renewal Final Notice, Extension of DOE N 470.5 - September 28, 2011

111

TITLE PAGE  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

112

Final Report for the DOE Chemical Hydrogen Storage Center of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and recommendations from the DOE's Chemical Hydrogen Storage Center of Excellence, led by Los Alamos National Laboratory with Pacific Northwest National Laboratory from 2005...

113

DOE and HBCU MOU FINAL NR.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

has helped DOE's Environmental Management program advance research and development of innovative technologies and approaches for solving the Nation's critical environmental...

114

DOE Issues Final Request for Proposal for Portsmouth Gaseous...  

Energy Savers (EERE)

The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion...

115

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

116

EIS-0377: DOE Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: DOE Notice of Availability of the Final Environmental 77: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project The Western Area Power Administration (Western) announces the availability of the Big Stone II Power Plant and Transmission Project (Project) Final Environmental Impact Statement (EIS). Notice of Availability for Western Area Power Administration Big Stone II Power Plant and Transmission Project Final Environmental Impact Statement, DOE/EIS-0377 (June 2009), 74 FR 30559 More Documents & Publications EIS-0183: Notice of Extension of Scoping Period EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings

117

DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014  

Energy.gov (U.S. Department of Energy (DOE))

ACQUISITION AND PROJECT MANAGEMENT GLOSSARY OF TERMS HANDBOOK This handbook provides definitions of acquisition and project management terms commonly used in DOE projects to ensure consistent use of terms in DOE project documents and discussions. DOE APM Glossary of Terms Handbook Final, September 2014

118

Microsoft Word - Final Environmental Assessment _EA_ DOE EA 1789.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the for the Construction and Operation of a Proposed Cellulosic Biorefinery, Alpena Prototype Biorefinery, Alpena, Michigan DOE/EA-1789 Prepared for: U.S. Department of Energy Energy Efficiency and Renewable Energy October 2010 Contents DOE EA-1789 i October 2010 CONTENTS Section Page Acronyms and Abbreviations ....................................................................................................................... v 1. Introduction and purpose and need ..................................................................................................... 1 1.1 Purpose and Need ...................................................................................................................... 1 1.2 National Environmental Policy Act and Related Procedures .................................................... 2

119

Federal operating permits program under Title V of the Clean Air Act. Final report  

SciTech Connect

;Table of Contents: Introduction; Transition Between Parts 70 and 71; Title V Obligations and Applicability; Synthetic Minors, Potential to Emit, and Transition Policy; Permit Application Step and Content; Flexible Permit Approaches; Hazardous Air Pollution Program Requirements for Title V; Information Sources; Appendix A. EPA Memoranda; and Appendix B. Seminar Overhead Transparencies.

NONE

1996-08-01T23:59:59.000Z

120

DOE Issues Final RFP for Portsmouth Support Services  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses.

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

section999-final-reports | netl.doe.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

PDF-1.97MB 09121-3300-06 High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair, and Operations - 3D at Depth, LLC Phase 1 Final Report PDF-4.56MB 09121-3300-08...

122

DOE high-level waste tank safety program. Final report  

SciTech Connect

The overall objective of the work was to provide LANL with support to the DOE High-Level Waste Tank Safety Program. This effort included direct support to the DOE High-Level Waste Tank Working Groups, development of a database to track all identified safety issues, development of requirements for waste tank modernization, evaluation of external comments regarding safety-related guidance/instruction developed previously, examination of current federal and state regulations associated with DOE Tank farm operations, and performance of a conduct of operations review. All tasks which were assigned under this Task Order were completed. Descriptions of the objectives of each task and effort performed to complete each objective is provided.

NONE

1998-11-01T23:59:59.000Z

123

DOE-WIPP 02-3214 FINAL _3_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

REMOTE-HANDLED TRU WASTE REMOTE-HANDLED TRU WASTE CHARACTERIZATION PROGRAM IMPLEMENTATION PLAN DOE/WIPP-02-3214 Revision 3 September 19, 2012 U.S. Department of Energy Carlsbad Field Office DOE/WIPP-02-3214 Revision 3 2 Table of Contents 1.0 Introduction ........................................................................................................................6 2.0 RH TRU Waste Characterization Program Requirements and Objectives .................7 2.1. Data Quality Objectives (DQOs) and Quality Assurance Objectives (QAOs) ....... 7 2.1.1. DQO for Defense Waste, High- Level Waste, and Spent Nuclear Fuel Determination ..............................................................................................8 2.1.2. DQOs for Radioactive Properties ................................................................8

124

EIS-0355: DOE Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Notice of Availability of the Final Environmental DOE Notice of Availability of the Final Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings

125

DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Final Site-Wide Environmental Impact Statement for the DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site February 22, 2013 - 2:38pm Addthis DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site The U.S. Department of Energy, National Nuclear Security Administration (NNSA) has issued the Final Site-Wide Environmental Impact Statement (EIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. This document presents an analysis of the potential environmental impacts of continued management and operation of the NNSS (formerly known as the Nevada Test Site), the Tonopah Test Range, and two locations in Las

126

Microsoft Word - 2006.12.DOE.RFEC.Final.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

4NT42266 Final Report - GTI 4NT42266 Final Report - GTI Reduced Mandated Inspection by Remote Field Eddy Current Inspection of Unpiggable Pipelines T e c h n i c a l F i n a l R e p o r t Reporting Period Start Date: October 1, 2005 Reporting Period End Date: September 30, 2006 GTI Project Manager: Albert Teitsma GTI Principal Investigator: Julie Maupin October 2006 DE-FC26-04NT42266 Prepared by: Gas Technology Institute 1700 S. Mount Prospect Road Des Plaines, Illinois 60018 DE-FC26-04NT42266 Final Report - GTI DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or

127

DoE CBM Review 03-12-2012 final  

NLE Websites -- All DOE Office Websites (Extended Search)

Condition Based Monitoring of Gas Condition Based Monitoring of Gas Turbine Combustion Components Program Review Nancy Ulerich Ph.D. Getnet Kidane Nikolai Tevs Ph.D. Siemens Energy, Inc. DoE Funding Opportunity No. DE-PS26-08NT00440-1B DoE Award Cooperative Agreement No. DE-NT0006833 March 2012 03-14-2012 2 Siemens Energy, Inc. Gas Turbine Combustion Section Online Condition Monitoring Needs Compressor Combustor Turbine Hot section combustion components of gas turbine engine are exposed to harsh operating conditions and high temperatures. As a result, combustion parts have shorter design lives and more frequent maintenance inspection interval requirements than other parts of the turbine engine. Frequent maintenance inspection outages affect engine availability and reliability. Use of sensor technology that directly detect and monitor hardware life online can

128

Microsoft Word - DOE 2001 energy meter report, final.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DEVELOPMENT OF A LOW-COST INFERENTIAL NATURAL GAS DEVELOPMENT OF A LOW-COST INFERENTIAL NATURAL GAS ENERGY FLOW RATE PROTOTYPE RETROFIT MODULE TOPICAL REPORT For the reporting period: September 2000 - January 2002 Prepared by: E. Kelner T. E. Owen D. L. George A. Minachi M. G. Nored C. J. Schwartz March 2004 Prepared for: GAS RESEARCH INSTITUTE U.S. DEPARTMENT OF ENERGY GRI Contract No. 5097-270-3937 DOE Cooperative Agreement No. DE-FC21-96MC33033 GRI Project Manager DOE Technical Monitor Charles E. French James Ammer Pipeline Operations Gas Supply Projects Submitted by: SOUTHWEST RESEARCH INSTITUTE ® Mechanical and Fluids Engineering Division 6220 Culebra Road San Antonio, Texas, USA 78238-5166 ii This page is intentionally blank. iii Disclaimer This report was prepared as an account of work sponsored by an agency of the United States

129

Microsoft Word - DOE IT CPIC Guide 092910_FINAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning and Investment Control (CPIC) IT Capital Planning and Investment Control (CPIC) U.S. Department of Energy Guide to IT Capital Planning and Investment Control (CPIC) September 2010 Office of the Chief Information Officer Guide to IT Capital Planning and Investment Control (CPIC) TABLE OF CONTENTS 1.0 Preface ............................................................................................................................. 1 2.0 Introduction ..................................................................................................................... 2 2.1 Capital Planning and Investment Control Overview ............................................... 2 2.2 DOE CPIC Process Overview ................................................................................ 3

130

New York City Transit Diesel Hybrid-Electric Buses Final Results: DOE/ NREL  

Open Energy Info (EERE)

Transit Diesel Hybrid-Electric Buses Final Results: DOE/ NREL Transit Diesel Hybrid-Electric Buses Final Results: DOE/ NREL Transit Bus Evaluation Project Jump to: navigation, search Name New York City Transit Diesel Hybrid-Electric Buses Final Results: DOE/ NREL Transit Bus Evaluation Project Agency/Company /Organization Department of Energy Partner National Renewable Energy Laboratory Batelle"National Renewable Energy Laboratory Batelle" cannot be used as a page name in this wiki. Focus Area Transportation Phase Bring the Right People Together, Determine Baseline, Evaluate Options, Develop Finance and Implement Projects Resource Type Guide/manual Availability Publicly available--Free Publication Date 7/1/2002 Website http://www.nrel.gov/docs/fy02o Locality New York City References New York City Transit Diesel Hybrid-Electric Buses Final Results: DOE/ NREL Transit Bus Evaluation Project[1]

131

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

132

Progress Reports and Final Report | U.S. DOE Office of Science...  

Office of Science (SC) Website

F: (301) 903-2597 E: sc.hep@science.doe.gov More Information Guidelines Progress Reports and Final Report Print Text Size: A A A FeedbackShare Page Progress Reports: For...

133

DOE Issues Final Rule for Section 133 of the Energy Independence Act (Fact Sheet)  

SciTech Connect

This fact sheet provides a summary of the final rule under Section 133 of the Energy Independence and Security Act of 2007 (EISA) that the U.S. Department of Energy (DOE) issued in March 2014.

Not Available

2014-04-01T23:59:59.000Z

134

DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the performance of infrastructure support services at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky.

135

DOE Publishes Final Rule for the Request for Exclusion of 100...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Request for Exclusion of 100 Watt R20 Short Incandescent Reflector Lamps from Energy Conservation Standards DOE Publishes Final Rule for the Request for Exclusion of 100 Watt...

136

DOE Grant DEFG02-95ER25253 Final Report Development of Simulation...  

Office of Scientific and Technical Information (OSTI)

i . ? 1 r DOE Grant DEFG02-95ER25253 Final Report Development of Simulation Tools for Virus Shell Assembly Bonnie Berger Introduction Prof. Berger's major areas of research have...

137

Final Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South Table Mountain Complex (DOE/EA 1440)  

Office of Energy Efficiency and Renewable Energy (EERE)

Final Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South Table Mountain Complex (DOE/EA 1440)

138

RAV4_24551_Report_DOE_Final_.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

TOYOTA RAV4 EV - CONDUCTIVE TOYOTA RAV4 EV - CONDUCTIVE Panasonic NiMH Battery ELECTRIC TRANSPORTATION DIVISION Report prepared by: Alvaro Mendoza Juan Argueta January 2000 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES THIS REPORT WAS PREPARED BY THE ELECTRIC TRANSPORTATION DIVISION OF SOUTHERN CALIFORNIA EDISON, A SUBSIDIARY OF EDISON INTERNATIONAL. NEITHER THE ELECTRIC TRANSPORTATION DIVISION OF SOUTHERN CALIFORNIA EDISON, SOUTHERN CALIFORNIA EDISON, EDISON INTERNATIONAL, NOR ANY PERSON WORKING FOR OR ON BEHALF OF ANY OF THEM MAKES ANY WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED, (I) WITH RESPECT TO THE USE OF ANY INFORMATION, PRODUCT, PROCESS OR PROCEDURE DISCUSSED IN THIS REPORT, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, OR (II) THAT SUCH USE DOES NOT INFRINGE UPON OR INTERFERE WITH RIGHTS OF OTHERS, INCLUDING

139

Microsoft Word - DOE Produced Water Project - Final Report 2.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Technical Progress Report Annual Technical Progress Report October 1, 2005 to March 31, 2006 DOE Award No. 41906 Use of Produced Water in Recirculating Cooling Systems at Power Generating Facilities Deliverable Number 11 Kent Zammit, EPRI Project Manager Electric Power Research Institute, Inc. 3412 Hillview Ave. Palo Alto, CA 94304-13952 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe

140

Microsoft Word - DOE Report on OSU Looping final.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2007 December 2007 DOE/NETL-2008/1307 Independent Assessment of the Potential of Chemical-Looping in the Context of a Fischer-Tropsch Plant Chemical-Looping Process in a Coal-to-Liquids Configuration Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name,

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Final Report for DOE Grant Number DE-SC0001481  

SciTech Connect

This report covers research activities, major results and publications supported by DE-SC-000-1481. This project was funded by the DOE OFES-NNSA HEDLP program. It was a joint research program between Rice University and the University of Texas at Austin. The physics of relativistic plasmas was investigated in the context of ultra-intense laser irradiation of high-Z solid targets. Laser experiments using the Texas Petawatt Laser were performed in the summers of 2011, 2012 and 2013. Numerical simulations of laser-plasma interactions were performed using Monte Carlo and Particle-in-Cell codes to design and support these experiments. Astrophysical applications of these results were also investigated.

Liang, Edison [Rice University

2013-12-02T23:59:59.000Z

142

ABSTRACT FINAL ID: SM13A-2029 TITLE: Particle-in-Cell Simulations of Two-dimensional Bernstein-Greene-Kruskal (BGK)  

E-Print Network (OSTI)

ABSTRACT FINAL ID: SM13A-2029 TITLE: Particle-in-Cell Simulations of Two-dimensional Bernstein, University of Alaska Fairbanks, Fairbanks, AK, United States. Title of Team: ABSTRACT BODY: Electrostatic with modulations having frequency of the order of electron cyclotron frequency. This work is supported

Ng, Chung-Sang

143

DOE/EA-1510; Final Environmental Assessment for the Alternate Financed Facility Modernization  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment for the Final Environmental Assessment for the Alternate Financed Facility Modernization Alternate Financed Facility Modernization January 2005 January 2005 U.S. Department of Energy U.S. Department of Energy Oak Ridge Y-12 Site Office Oak Ridge Y-12 Site Office National Nuclear Security Administration National Nuclear Security Administration DOE/EA-1510 DOE/EA-1510 Alternate Financed Facility Modernization EA Final i January 2005 TABLE OF CONTENTS List of Acronyms and Abbreviations............................................................................................. vi Chemicals and Units of Measure ................................................................................................... ix Conversion Chart ...........................................................................................................................

144

EIS-0440: DOE Notice of Availablity of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0440: DOE Notice of Availablity of the Final Environmental EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement DOE announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western's Bouse-Kofa 161-kilovolt transmission line. The proposal includes amending the Bureau of Land Management Resource Management Plan. Cooperating agencies in the preparation of this EIS are Bureau of Land Management (Yuma Field Office ), U.S. Army Corps of Engineers, U.S. Army Garrison (Yuma Proving Grounds), Arizona Game and Fish Department, and the Arizona Department of Environmental Quality.

145

DOE Issues Final Environmental Impact Statement for the FutureGen 2.0  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Final Environmental Impact Statement for the FutureGen Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois DOE Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois October 25, 2013 - 2:48pm Addthis The U.S. Department of Energy has issued the Final Environmental Impact Statement (EIS) for the FutureGen 2.0 Project. The EIS evaluates the potential impacts associated with DOE's proposed action to provide financial assistance to the FutureGen Industrial Alliance (the Alliance) for the FutureGen 2.0 Project, including the direct and indirect environmental impacts from construction and operation of the proposed project. DOE's proposed action would provide approximately $1 billion of funding (primarily under the American Recovery and Reinvestment Act) to

146

DOE _Final_ DOE - Enclosure 5 to 2005 CS 647b Report - hum...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DOE Alignment of Human Capital and Competitive Sourcing Initiatives The Department of Energy (DOE) has continued to align and link all initiatives associated with the President's Management Agenda. Specifically, the Human Capital Management principles continue to be an integral part of the Competitive Sourcing/A-76 initiative. The Chief Human Capital Officer (CHCO) continues to serve as an advisor to the Department's Competitive Sourcing Executive Steering Group. In addition, the Department has filled the position of Human Resource Advisor (HRA) for all competitive sourcing activities being conducted within the Department. The HRA has designated a Human Resource Advisor Representative to support each competitive sourcing study being conducted, includ

147

Microsoft Word - Lat_Corr_DOE_Rpt_Dec16_FCM _FinalDraft.rtf  

Office of Scientific and Technical Information (OSTI)

FINAL PROJECT REPORT FINAL PROJECT REPORT Project Title: An Improved Method of Manufacturing Corrugated Boxes: Lateral Corrugator Date of Report: December 10, 2008 Recipient: Georgia Tech Research Corporation Performing Organization: Institute of Paper Science and Technology at Georgia Tech 500 10 th St, NW Atlanta, GA 30332-0620 Award Number: DE-FC36-01GO10616 Subcontractors: None Other Partners: Temple-Inland Paperboard and Packaging, Smurfit-Stone Container Corp., MarquipWardUnited, Corrugated Gear, Albany International, Armstrong, Container Graphics Corporation, CUE, Harper-Love Adhesives, The Johnson Corporation, Corn Products International, Hardy Instrumentation, WIKA Instrument Corp., Chicago Electric, Pamarco Global Graphics, Bill Nikkel

148

EIS-0355: DOE Notice of Availability of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Final Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Final Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings

149

D:\0myfiles\DOE Policy (LBL) Blackout Final\final-blackout-body-xx.vp  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Canada Canada Power System Outage Task Force Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations April 2004 U.S.-Canada Power System Outage Task Force Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations April 2004 ii G U.S.-Canada Power System Outage Task Force G August 14th Blackout: Causes and Recommendations G U.S.-Canada Power System Outage Task Force March 31, 2004 Dear Mr. President and Prime Minister: We are pleased to submit the Final Report of the U.S.-Canada Power System Outage Task Force. As directed by you, the Task Force has completed a thorough investigation of the causes of the August 14, 2003 blackout and has recommended actions to minimize the likelihood and scope of similar events in the future.

150

DOE Finalizes New Rule to Protect Trade Secrets and Confidential Business  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finalizes New Rule to Protect Trade Secrets and Confidential Finalizes New Rule to Protect Trade Secrets and Confidential Business Information DOE Finalizes New Rule to Protect Trade Secrets and Confidential Business Information May 5, 2011 - 4:55pm Addthis The Department of Energy today announced that it has issued a new rule standardizing how private parties applying for DOE assistance should submit trade secrets and other confidential business information. The new rule will give applicants greater assurance that their confidential business information will not be inadvertently disclosed, while enabling the Department to respond more quickly to Freedom of Information Act requests. Until now, different DOE programs have had different rules for how to submit such information. In order to make the process more efficient, the

151

DOE/EIS-0397: Lyle Falls Fish Passage Project Final Environmental Impact Statement (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Final Environmental Impact Statement DOE/EIS-0397 November 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BON N E V I L L E POW E R AD M I N I S T R A T I O N DOE/BP-3957 November 2008 Lyle Falls Fish Passage Facility Lyle Falls Fish Passage Project Final Environmental Impact Statement Bonneville Power Administration Confederated Tribes and Bands of the Yakama Nation Washington Department of Fish and Wildlife U.S.D.A. Forest Service November 2008 Lyle Falls Fish Passage Facility Lyle Falls Fish Passage Project Final Environmental Impact Statement (EIS) DOE/EIS-0397

152

The U.S. Department of Energy (DOE) is undertaking the final steps of the Montic  

Office of Legacy Management (LM)

(DOE) is undertaking the final steps of the Monticello Vicinity Properties Project to (DOE) is undertaking the final steps of the Monticello Vicinity Properties Project to ensure that all contaminated materials generated as a result of activities at the Monticello millsite are identified and safely disposed. DOE is currently investigating whether some contaminated building equipment and materials may have left the site during the period of millsite operation. This fact sheet describes DOE's efforts to identify all properties containing con- taminated Monticello millsite materials within an 8-mile radius of the millsite, and any other locations where contaminated materials may have been taken. Background The Monticello millsite was used for the milling of ura- nium and vanadium ore from 1940 until the closure of the mill in 1960. During that period, the site was man-

153

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02-1995/voli.html[6/27/2011 12:23:34 PM] 02-1995/voli.html[6/27/2011 12:23:34 PM] DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement VOLUME II VOLUME II Part A COVER SHEET RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of Energy Cooperating Federal Agency: U.S. Department of the Navy TITLE: Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. CONTACT: For further information on this Environmental Impact Statement call or contact: DOE Idaho Operations Office Bradley P. Bugger Office of Communications 850 Energy Drive, MS 1214 Idaho Falls, ID 83403-3189

154

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

NLE Websites -- All DOE Office Websites (Extended Search)

02-1995/voli.html[6/27/2011 12:23:34 PM] 02-1995/voli.html[6/27/2011 12:23:34 PM] DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement VOLUME II VOLUME II Part A COVER SHEET RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of Energy Cooperating Federal Agency: U.S. Department of the Navy TITLE: Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. CONTACT: For further information on this Environmental Impact Statement call or contact: DOE Idaho Operations Office Bradley P. Bugger Office of Communications 850 Energy Drive, MS 1214 Idaho Falls, ID 83403-3189

155

DOE/EIS-0294; Sutter Power Project Final Environmental Impact Statement, Volume I (April 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sutter Power Project Final EIS Sutter Power Project Final EIS April, 1999 1 - 3 CHAPTER 1 INTRODUCTION TO THE FINAL ENVIRONMENTAL IMPACT STATEMENT 1.1 INTRODUCTION Western Area Power Administration (Western) is a power marketing administration of the U.S. Department of Energy (DOE). Western owns and operates a grid of electrical transmission lines in 15 western states, including California. The Calpine Corporation (Calpine) has requested an interconnection to Western's Keswick- Elverta/Olinda-Elverta double-circuit 230-kV transmission line to transmit electricity generated by their proposed Sutter Power Project (SPP). The SPP is a proposed 500- megawatt (MW) natural gas-fueled, combined-cycle, electric generation facility. This Final Environmental Impact Statement (EIS) can be viewed on DOE's National

156

2012 DOE Sustainability Awards PSO Site Title EE National Renewable Energy Laboratory Comprehensive Energy Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Sustainability Awards Sustainability Awards PSO Site Title EE National Renewable Energy Laboratory Comprehensive Energy Management EM Headquarters - EM Environmental Management's Sustainability Hero EM Savannah River Site SRS - An Innovative Approach for In-Situ Detection of Mercury in Soils and Sediments EM Savannah River Site SRS Biomass Steam and Co-generation Project EM Savannah River Site SRS Moving Beyond Pump and Treat for cVOC Remediation FE National Energy Technology Laboratory Exceptional Service/Sustainability Champion FE National Energy Technology Laboratory Successful Implementation of NETL's Environmental Management System FE National Energy Technology Laboratory Water Resources LM Legacy Management Not Just Your Average EMS NA Los Alamos National Laboratory Ronnie Garcia - Master of Minimization

157

DOE _Final_ DOE - Enclosure 4 to 2005 CS 647b Report OMB.d...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Projected Number of DOE FTEs To Be Announced for Competition in FY 2006 The Department of Energy anticipates announcing an estimated 100-300 FTEs for public-private competition under its Competitive Sourcing program by the end of FY 2006. The Department is employing a sound methodology for identifying potential competitions, nominating potential competition candidates, analyzing nominated candidates through feasibility reviews, executing competitions, and implementing the results. The Federal Activities Inventory Reform Act of 1998 (FAIR Act) commercial activities inventory forms the primary basis for identifying potential candidates for nomination to undergo a feasibility review. A feasibility review, which is not a formal competitive sourcing study, is a preliminary assessment to

158

DOE/EA-1837:Final Environmental Assessment for the Performance Verification Laboratory (January 2011)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment for the Performance Verification Laboratory January 2011 DOE/EA-1837 This page left intentionally blank. Performance Verification Laboratory DOE/EA-1837 U.S. Department of Energy Final Environmental Assessment National Energy Technology Laboratory January 2011 i National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) is proposing to construct and operate a Performance Verification Laboratory (PVL) facility to be located on the Morgantown NETL site in West Virginia. NETL would design, construct, and make operational a DOE PVL facility for verifying the energy performance of selected appliances and equipment to facilitate improved enforcement of DOE energy conservation

159

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

160

Waste Isolation Pilot Plant Title I operator dose calculations. Final report, LATA report No. 90  

SciTech Connect

The radiation exposure dose was estimated for the Waste Isolation Pilot Plant (WIPP) operating personnel who do the unloading and transporting of the transuranic contact-handled waste. Estimates of the radiation source terms for typical TRU contact-handled waste were based on known composition and properties of the waste. The operations sequence for waste movement and storage in the repository was based upon the WIPP Title I data package. Previous calculations had been based on Conceptual Design Report data. A time and motion sequence was developed for personnel performing the waste handling operations both above and below ground. Radiation exposure calculations were then performed in several fixed geometries and folded with the time and motion studies for individual workers in order to determine worker exposure on an annual basis.

Hughes, P.S.; Rigdon, L.D.

1980-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE/EIS-0294; Sutter Power Project Final Environmental Impact Statement, Volume I (April 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COVER SHEET COVER SHEET Project Title: Sutter Power Project, Final Environmental Impact Statement Sutter County, California Federal Lead Agency: Western Area Power Administration, U.S. Department of Energy Related Actions: California Energy Commission's Certification for the Sutter Power Project Calpine Corporation's Application for Certification for the Sutter Power Project Sutter County General Plan Amendment and a Planned Development Rezone Western's Sutter Powerplant -- Interconnection Feasibility Study Technical Assistance: Foster Wheeler Environmental Corporation CH2M Hill R. W. Beck ABSTRACT Western Area Power Administration operates and maintains a high-voltage electric transmission system in California to deliver power to qualified customers. Calpine Corporation has requested that Western study

162

DOE/EIS-0342; Wanapa Energy Center Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interior Interior Bureau of Indian Affairs December 2004 Wanapa Energy Center Final Environmental Impact Statement Cooperating Agencies: DOE/EIS-0342 i CONTENTS EXECUTIVE SUMMARY.................................................................................................................ES-1 ACRONYMS AND ABBREVIATIONS.......................................................................................... AA-1 1.0 INTRODUCTION ....................................................................................................................1-1 1.1 Project Background...........................................................................................................1-1 1.2 Purpose and Need..............................................................................................................1-3

163

DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for support services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak Ridge, Tennessee. The total estimated value of the contract is $100 Million - $300 Million.

164

TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements  

SciTech Connect

This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

Alan Bond

2001-04-01T23:59:59.000Z

165

Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities  

SciTech Connect

Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

1998-12-31T23:59:59.000Z

166

DOE/EA-1535; Uranium Leasing Program Final Programmatic Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Leasing Program Leasing Program Final Programmatic Environmental Assessment July 2007 Office of Legacy Management DOE/EA 1535 - Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy DOE/EA-1535 Uranium Leasing Program Final Programmatic Environmental Assessment July 2007 U.S. Department of Energy Office of Legacy Management U.S. Department of Energy Uranium Leasing Program Environmental Assessment July 2007 Doc. No. Y0011700 Page iii Contents Abbreviations and Acronyms ........................................................................................................

167

EIS-0440: DOE Notice of Availablity of the Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availablity of the Final Environmental Availablity of the Final Environmental Impact Statement EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement DOE announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western's Bouse-Kofa 161-kilovolt transmission line. The proposal includes amending the Bureau of Land Management Resource Management Plan. Cooperating agencies in the preparation of this EIS are Bureau of Land Management (Yuma Field Office ), U.S. Army Corps of Engineers, U.S. Army Garrison (Yuma Proving Grounds), Arizona Game and Fish Department, and the Arizona Department of Environmental Quality. EIS-0440-DOENOA-FEIS-2012.pdf

168

DOE/EA-1792 FINAL ENVIRONMENTAL ASSESSMENT FOR UNIVERSITY OF MAINE'S  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL FINAL ENVIRONMENTAL ASSESSMENT FOR UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT GULF OF MAINE U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2011 DOE/EA-1792 FINAL ENVIRONMENTAL ASSESSMENT FOR UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT GULF OF MAINE U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2011 DOE/EA-1792 iii September 2011 ACRONYMS AND ABBREVIATIONS APE area of potential effects CFR Code of Federal Regulations dBA decibel on the A-weighted scale, used to approximate the human ear's response to sound

169

Microsoft Word - S05979_DOE-LM_Executable Plan2009-Final_Rev 2changes accepted_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order 430.2B Order 430.2B Executable Plan for LM (DOE FEMP Final) December 2009 LMS/S05979 This page intentionally left blank Signature for Site DOE Order 430.2B Executable Plan for LM (DOE FEMP Final) Office Concurrence This page intentionally left blank U.S. Department of Energy DOE Order 430.2B Executable Plan for LM (DOE FEMP Draft) December 2009 Doc. No. S05979 Page i Contents 1.0 Executive Summary ............................................................................................................ 1 2.0 DOE Order 430.2B Goal Summary Progress ..................................................................... 2 3.0 Energy Intensity ..................................................................................................................

170

Progress Reports and Final Report | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Progress Reports and Final Report Progress Reports and Final Report High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search Peer Merit / Review Policies Early Career Research Opportunities in High Energy Physics Graduate Fellows in High Energy Theory Guidelines Comparative Review Annual Solicitation Progress Reports and Final Report Conferences Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Guidelines Progress Reports and Final Report Print Text Size: A A A

171

DOE Finalizes $1.45 Billion Loan Guarantee for One of the World's Largest  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finalizes $1.45 Billion Loan Guarantee for One of the World's Finalizes $1.45 Billion Loan Guarantee for One of the World's Largest Solar Generation Plants DOE Finalizes $1.45 Billion Loan Guarantee for One of the World's Largest Solar Generation Plants December 21, 2010 - 12:00am Addthis Washington D.C. - U.S. Energy Secretary Steven Chu today announced a $1.45 billion loan guarantee has been finalized for Abengoa Solar Inc.'s Solana project, the world's largest parabolic trough concentrating solar plant. Located near Gila Bend, Arizona, the 250-megawatt (MW) project is the first large-scale solar plant in the United States capable of storing energy it generates. Solana will produce enough energy to serve 70,000 households and will avoid the emissions of 475,000 tons of carbon dioxide per year compared to a natural gas burning power plant.

172

DOE Finalizes $1.6 Billion Loan Guarantee for BrightSource Energy Inc. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finalizes $1.6 Billion Loan Guarantee for BrightSource Energy Finalizes $1.6 Billion Loan Guarantee for BrightSource Energy Inc. DOE Finalizes $1.6 Billion Loan Guarantee for BrightSource Energy Inc. April 11, 2011 - 12:00am Addthis Washington D.C. - Announced this afternoon via Twitter.com/energy, the U.S. Department of Energy finalized $1.6 billion in loan guarantees to support the Ivanpah Solar Energy Generating System, three related utility-scale concentrated solar power plants. The Recovery Act funded project, sponsored by BrightSource Energy, Inc., will be located on federally-owned land in the Mojave Desert in southeastern California, near the Nevada border, and will be one of the world's largest concentrated solar power complexes. BrightSource estimates the project will create approximately 1,000 construction jobs and 86 operations and maintenance

173

Final Rule (October 23, 2007)  

Energy.gov (U.S. Department of Energy (DOE))

Loan Guarantees for Projects That Employ Innovative Technologies; Final Rule: On May 16, 2007, the Department of Energy (DOE or the Department) published a Notice of Proposed Rulemaking and opportunity for comment (NOPR) to establish regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (Title XVII or the Act).

174

DOE/EIS-0283; Surplus Plutonium Disposition Final Environmental Impact Statement (11/1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Final Environmental Impact Statement November 1999 Summary DOE/EIS-0283 Surplus Plutonium Disposition Final Environmental Impact Statement Summary United States Department of Energy Office of Fissile Materials Disposition November 1999 Summary i Table of Contents S.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-1 Purpose of and Need for the Proposed Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-3 Issues Identified During the Scoping Period . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-4 Issues Already Intended for Inclusion in the SPD EIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-4 Additional Issues That Need to Be Addressed in the SPD EIS . . . . . . . . . . . . . . . . . . . . . . . . S-5 Issues That Need to Be or Are Already Addressed Elsewhere . . . . . . . . . . . . . . . .

175

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

176

DOE/EA-1652: Final Environmental Assessment Wind Technology Testing Center (August 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Technology Testing Center Boston, Massachusetts August 2009 DOE/EA-1652 Department of Energy National Renewable Energy Laboratory 1617 Cole Boulevard Golden, CO 80401-3393 NREL - ENVIRONMENTAL ASSESSMENT FOR THE WIND TECHNOLOGY TESTING CENTER, BOSTON, M.A. FINAL EA, AUGUST 2009 i Table of Contents SUMMARY ................................................................................................................................. S-1 1.0 INTRODUCTION ............................................................................................................... 1 1.1 THE NATIONAL ENVIRONMENTAL POLICY ACT AND RELATED PROCEDURES ................................ 1 1.2 PURPOSE AND NEED ....................................................................................................................... 2

177

Phase I Final Report DOE Contract No. DE-FC26-02NT41576 November 18, 2003  

E-Print Network (OSTI)

, and Scott Swartz Report Issued: November, 2003 SECA Phase I Core Technology Project DOE Contract No. DE-FC26Phase I Final Report DOE Contract No. DE-FC26-02NT41576 November 18, 2003 Hydrocarbon and Sulfur: (614) 842-6607 swartz@nextechmaterials.com #12;Phase I Final Report DOE Contract No. DE-FC26-02NT41576

Azad, Abdul-Majeed

178

DOE/EA-1760 Final Environmental Assessment for FutureFuel Chemical Company  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Final Environmental Assessment for FutureFuel Chemical Company Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Batesville, AR August 2010 Prepared for: Department of Energy National Energy Technology Laboratory Electric Drive Vehicle Battery and DOE/EA-1760 Component Manufacturing Initiative Project Environmental Assessment FutureFuel Chemical Company, Batesville, AR August 2010 National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: The U.S. Department of Energy (DOE) proposes, through a cooperative agreement with FutureFuel Chemical Company (FutureFuel), to partially fund the design, installation and operations of a commercial-scale plant to produce intermediate anode material for high-performance lithium-ion (Li-ion) batteries. An existing FutureFuel

179

FINAL DOE/OR/21950-1016 RESPONSIVENESS SUMMARY= PRAXAIR INTERIM ACTIONS ENGINEERING  

Office of Legacy Management (LM)

p//l/ * :P/ p//l/ * :P/ 142366 _ FINAL DOE/OR/21950-1016 RESPONSIVENESS SUMMARY= PRAXAIR INTERIM ACTIONS ENGINEERING EVALUATION/COST ANALYSIS (EEKA) TONAWANDA, NEW YORK MAY 1996 prepared by U.S. Department of Energy, Oak Ridge Operations Off ice, Formerly Utilized Sites Remedial Action Program with technical assistance from Science Applications International Corporation ESC-FUSRAP under Contract No. DE-AC05-91OR21950 TABLE OF CONTENTS LISTOFTABLES ........................................... iii ACRONYMS AND ABBREVIATIONS ............................... v 1. INTRODUCTION ......................................... 1 2. SCOPE AND ORGANIZATION OF THE RESPONSIVENESS SUMMARY ..... 1 3. COMMENTSANDRESPONSES ....................... .: ... . .... 1 3.1 THE PREFERRED REMEDY .............................

180

DOE Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle -- Final Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Building Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle Final Report G Redmond Wolf J Dohack LD Winges Battelle Centers for Public Health Research and Evaluation Seattle, Washington Prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Washington, D.C. February 2012 DOE Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle Final Report G Redmond Wolf J Dohack LD Winges Centers for Public Health Research and Evaluation Seattle, Washington Prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Washington, D.C. February 2012 Contents 1.0 Introduction .................................................................................................................................. 1

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Oil & Natural Gas Technology DOE Award No.: DE-FE0000408 Final Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil & Natural Gas Technology Oil & Natural Gas Technology DOE Award No.: DE-FE0000408 Final Report October 2009 - September 2012 Post Retort, Pre Hydro-treat Upgrading of Shale Oil Submitted by: Ceramatec Inc 2425 S. 900 W. Salt Lake City, UT 84119 Prepared by: John H. Gordon, PI Prepared for: United States Department of Energy National Energy Technology Laboratory January 25, 2013 Office of Fossil Energy Final Report: October 2009 - September 2012 Ceramatec Inc, 1 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their em- ployees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

182

Report Title: Mapping  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

183

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Nevada Rail Corridor SEIS Rail Alignment EIS - Chapters 1 and 2 U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2; the Nevada Rail Corridor SEIS), and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369; the Rail Alignment EIS) CONTACTS: For more information about this document, For general information on the DOE NEPA process,

184

DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Summary U.S. Department of Energy Office of Environmental Management COVER SHEET Lead Agency: U.S. Department of Energy Cooperating Agencies: * National Park Service * Bureau of Land Management * U.S. Nuclear Regulatory Commission * U.S. Army Corps of Engineers * U.S. Fish and Wildlife Service * State of Utah * U.S. Environmental Protection Agency * Ute Mountain Ute Tribe * San Juan County * Grand County * City of Blanding * Community of Bluff Title: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (DOE/EIS-0355). Contact: For further information about this Environmental Impact Statement, contact: Don Metzler Moab Federal Project Director U.S. Department of Energy 2597 B ¾ Road

185

DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Chapters 1-11 U.S. Department of Energy Office of Environmental Management COVER SHEET Lead Agency: U.S. Department of Energy Cooperating Agencies: * National Park Service * Bureau of Land Management * U.S. Nuclear Regulatory Commission * U.S. Army Corps of Engineers * U.S. Fish and Wildlife Service * State of Utah * U.S. Environmental Protection Agency * Ute Mountain Ute Tribe * San Juan County * Grand County * City of Blanding * Community of Bluff Title: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (DOE/EIS-0355). Contact: For further information about this Environmental Impact Statement, contact: Don Metzler Moab Federal Project Director U.S. Department of Energy

186

DOE/EIS-0236-S1F; National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (January 2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I: Main Text I: Main Text Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California January 2001 [This page intentionally left blank] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement CONTACT: For additional information on For general information on the NEPA this statement, write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-467 Office of NEPA Policy and Compliance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW Telephone: (925) 423-3022

187

DOE/EA-1463 Environmental Assessment for Interim Final Rule, 10 CFR 433 and 10 CFR 435  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2007 , 2007 Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings" (DOE/EA-1463) Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings" (DOE/EA-1463) SUMMARY The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) for DOE's Final Rule, 10 CFR 433, "Energy Efficiency Standards for

188

DOE/EA-1463 Environmental Assessment for Interim Final Rule, 10 CFR 433 and 10 CFR 435  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings" (DOE/EA-1463) Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings" (DOE/EA-1463) SUMMARY The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) for DOE's Final Rule, 10 CFR 433, "Energy Efficiency Standards for

189

Oil & Natural Gas Technology DOE Award No.: DE-NT0005227 Final Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil & Natural Gas Technology Oil & Natural Gas Technology DOE Award No.: DE-NT0005227 Final Report Membrane Technology for Produced Water in Lea County Submitted by: Lea County Government 100 N. Main Lovington, NM 88260 And New Mexico Institute of Mining and Technology 801 Leroy Place Socorro, NM 87801 Report Authors: Cecilia E. Nelson, Principal Investigator Lea County Government and Ashok Kumar Ghosh, Ph.D., P.E. Principal Researcher, New Mexico Institute of Mining and Technology Prepared for: United States Department of Energy National Energy Technology Laboratory Office of Fossil Energy Report Date: September 20, 2011 Reporting Period: October 1, 2008 - June 30, 2011 2 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United

190

The Theory of High Energy Collision Processes - Final Report DOE/ER/40158-1  

SciTech Connect

In 1984, DOE awarded Harvard University a new Grant DE-FG02-84ER40158 to continue their support of Tai Tsun Wu as Principal Investigator of research on the theory of high energy collision processes. This Grant was renewed and remained active continuously from June 1, 1984 through November 30, 2007. Topics of interest during the 23-year duration of this Grant include: the theory and phenomenology of collision and production processes at ever higher energies; helicity methods of QED and QCD; neutrino oscillations and masses; Yang-Mills gauge theory; Beamstrahlung; Fermi pseudopotentials; magnetic monopoles and dyons; cosmology; classical confinement; mass relations; Bose-Einstein condensation; and large-momentum-transfer scattering processes. This Final Report describes the research carried out on Grant DE-FG02-84ER40158 for the period June 1, 1984 through November 30, 2007. Two books resulted from this project and a total of 125 publications.

Wu, Tai, T.

2011-09-15T23:59:59.000Z

191

DOE/EM-51  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOURCE EVALUATION BOARD REPORT TEMPLATE SOURCE EVALUATION BOARD REPORT TEMPLATE JUNE 2010 U.S. DEPARTMENT OF ENERGY [ACQUISITION OFFICE NAME] [INITIAL/FINAL] SOURCE EVALUATION BOARD REPORT REQUEST FOR PROPOSAL NUMBER __________ [ACQUISITION TITLE] SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104 This report covers the [initial/final] evaluation by the Source Evaluation Board (SEB) for the: U.S. DEPARTMENT OF ENERGY (DOE) [ACQUISITION OFFICE NAME] [ACQUISITION TITLE] SOLICITATION NUMBER _________________ Distribution is limited to those on a need-to-know basis, and this report must be treated as "OFFICIAL USE ONLY." THIS REPORT MAY NOT BE REPRODUCED. If transmitted by

192

Title Standards 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

193

Final Report for DOE grant project FG02-07ER41458 [Dense Quark Matter in Magnetic Fields  

SciTech Connect

Final Report for DOE grant DE-FG02-07ER41458. This grant was originally a three-year project. However, this final report summarizes the results of the first two years, as at the end of the second year of the grant the PIs moved to a new university and the grant was closed. The work done under the first two years of the DOE grant led to several papers and presentations. It also served to train one undergraduate and three graduate students.

Incera, Vivian

2012-01-24T23:59:59.000Z

194

First Name Last Name Title Company Email David Alman Director-Material Performance Division National Energy Technology Laboratory david.alman@netl.doe.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Collaborative National Conference - June 10, 2013 - Attendees Technologies Collaborative National Conference - June 10, 2013 - Attendees First Name Last Name Title Company Email David Alman Director-Material Performance Division National Energy Technology Laboratory david.alman@netl.doe.gov Tim Avampato Program Manager Eaton timjavampato@eaton.com Sharon Beermann-Curtin Program Officer Office of Naval Research sharon.beermanncurti@navy.mil Seth Blumsack Associate Professor Pennsylvania State University sab51@psu.edu Phil Bolin Chief Engineer Power Systems Group Mitsubishi Electric Power Products, Inc. phil.bolin@meppi.com Dushan Boroyevich Professor. Co-Director Virginia Tech - CPES mhawthor@vt.edu Steve Bossart Senior Analyst National Energy Technology Laboratory steven.bossart@netl.doe.gov Gary Bowers Commercial-Industrial Director S&C Electric Company gary.bowers@sandc.com

195

Final Technical Report on DOE Grant for Modeling of Plasma Rotation in the National Spherical Torus Experiment  

SciTech Connect

This is the final technical report on the Modeling of Plasma Rotation in National Spherical Torus Experiment (NSTX) DOE Grant No. DE-FG02-02ER54679. The research subjects, technical abstracts, and publications where details of the research results can be found are reported here.

Shaing, K. C.

2009-07-09T23:59:59.000Z

196

Final Report for the DOE Chemical Hydrogen Storage Center of Excellence  

Energy.gov (U.S. Department of Energy (DOE))

This technical report describes the activities carried out, key accomplishments, and recommendations from the DOEs Chemical Hydrogen Storage Center of Excellence, led by Los Alamos National Laboratory with Pacific Northwest National Laboratory from 2005 through 2010.

197

DOE/EA-1326: Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment (05/24/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TUCANNON RIVER SPRING CHINOOK TUCANNON RIVER SPRING CHINOOK CAPTIVE BROODSTOCK PROGRAM Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1326 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n BONNEVILLE POWER ADMINISTRATION Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment DOE/EA-1326 May 23, 2000 Tucannon River Spring Chinook Captive Broodstock Program PreliminaryFinal Environmental Assessment B o n n e v i l l e P o w e r A d m i n i s t r a t i o n i Table of Contents Page 1. PURPOSE AND NEED FOR ACTION ........................................................................................ 1 1.1 INTRODUCTION ................................................................................................................................ 1 1.2 NEED FOR ACTION ...........................................................................................................................

198

Implementation plan for Title 40 Code of Federal Regulations Parts 280 and 281; Final rules for underground storage tanks  

SciTech Connect

This report presents the schedules and methods required to comply with the newly promulgated Underground Storage Tank (UST) Regulations Title 40 Code of Federal Regulations (CFR) 280 and 281. These rules were promulgated by the US Environmental Protection Agency (EPA) on September 23, 1988, and became effective December 22, 1988. These regulations are required by Subtitle I of the Resource Conservation and Recovery Act of 1976. Their purpose is to protect the groundwater supplies of the United States in the following ways: Closing old tanks; detecting and remediating tank leaks and spills; establishing stringent standards for new tanks; and upgrade of existing tanks to new-tank standards. 3 refs., 5 tabs.

Stupka, R.C.

1989-04-01T23:59:59.000Z

199

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

200

Microsoft Word - DOE lead agency interim final and proposed rules - EEI comments 10-20-08.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

701 Pennsylvania Avenue, N.W. 701 Pennsylvania Avenue, N.W. Washington, D.C. 20004-2696 Telephone 202-508-5615 Fax 202-508-5673 www.eei.org EDWARD H. COMER Vice President & General Counsel October 20, 2008 Mr. John Schnagl Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy ("DOE") 1000 Independence Avenue, SW Washington, D.C. 20585 Submitted electronically via email to: SEC216h@hq.doe.gov Re: Consolidated Comments of the Edison Electric Institute ("EEI") on (1) DOE Interim Final Rule, RIN 1901-AB18, 73 Fed. Reg. 54456 (Sept. 19, 2008) and (2) DOE Proposed Rule, RIN 1901-AB18, 73 Fed. Reg. 54461 (Sept. 19, 2008)

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Microsoft Word - DOE lead agency interim final and proposed rules - EEI comments 10-20-08.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

701 Pennsylvania Avenue, N.W. 701 Pennsylvania Avenue, N.W. Washington, D.C. 20004-2696 Telephone 202-508-5615 Fax 202-508-5673 www.eei.org EDWARD H. COMER Vice President & General Counsel October 20, 2008 Mr. John Schnagl Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy ("DOE") 1000 Independence Avenue, SW Washington, D.C. 20585 Submitted electronically via email to: SEC216h@hq.doe.gov Re: Consolidated Comments of the Edison Electric Institute ("EEI") on (1) DOE Interim Final Rule, RIN 1901-AB18, 73 Fed. Reg. 54456 (Sept. 19, 2008) and (2) DOE Proposed Rule, RIN 1901-AB18, 73 Fed. Reg. 54461 (Sept. 19, 2008)

202

FINAL ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

203

Microsoft Word - Norwich Final EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 FINAL ENVIRONMENTAL ASSESSMENT FOR THE NORWICH COGENERATION INITIATIVE, NORWICH, CONNECTICUT U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia March 2011 DOE/EA-1836 FINAL ENVIRONMENTAL ASSESSMENT FOR THE NORWICH COGENERATION INITIATIVE, NORWICH, CONNECTICUT U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia March 2011 DOE/EA-1836 iii March 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE or the Department) Title: Final Environmental Assessment for the Norwich Cogeneration Initiative, Norwich, Connecticut (DOE/EA-1836) Contact: For additional copies or more information about this environmental assessment (EA),

204

Microsoft Word - Final DOE-CBFO-01-3107 PDP Management Plan_rev...  

NLE Websites -- All DOE Office Websites (Extended Search)

PROGRAM MANAGEMENT PLAN Revision 7 November 2014 U.S. Department of Energy Carlsbad Field Office TRU Sites and Transportation Division This document supersedes DOE...

205

DOE plutonium disposition study: Pu consumption in ALWRs. Volume 2, Final report  

SciTech Connect

The Department of Energy (DOE) has contracted with Asea Brown Boveri-Combustion Engineering (ABB-CE) to provide information on the capability of ABB-CE`s System 80 + Advanced Light Water Reactor (ALWR) to transform, through reactor burnup, 100 metric tonnes (MT) of weapons grade plutonium (Pu) into a form which is not readily useable in weapons. This information is being developed as part of DOE`s Plutonium Disposition Study, initiated by DOE in response to Congressional action. This document Volume 2, provides a discussion of: Plutonium Fuel Cycle; Technology Needs; Regulatory Considerations; Cost and Schedule Estimates; and Deployment Strategy.

Not Available

1993-05-15T23:59:59.000Z

206

EA-0387: DOE Notice of Availability of the Final Site-Wide Environment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the Department of Energy (DOE), announces the availability of the...

207

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

208

Final Week of National Energy Action Month Features Technological Advances in Clean Energy and DOE Support of Scientific Research  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTONDepartment of Energy officials will attend events across the country next week to highlight the clean energy technological advances and scientific initiatives supported by DOE. During the final week of National Energy Action Month, senior DOE officials will participate in events from San Francisco to North Carolina to Washington. Throughout October, Secretary of Energy Ernest Moniz and other Department officials are participating in events to emphasize the important role that the Administrations all-of-the-above energy strategy plays in strengthening Americas economic, environmental and national security future.

209

Microsoft Word - 01-15-09 DOE Press Release EAC Reports - FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE: Jennifer Scoggins (202) 586-4940 Thursday, January 15, 2009 DOE Announces Publication of Three Reports by the DOE Electricity Advisory Committee WASHINGTON - The Department of Energy's (DOE) Electricity Advisory Committee (EAC) released three reports prepared for the Secretary of Energy's consideration. These reports review challenges facing DOE and the Nation in many important electricity areas, and include recommendations for policy and program initiatives. They address issues surrounding generation and transmission adequacy, energy efficiency and demand response, deployment of energy storage technologies, and deployment of smart grid technologies. The EAC was chartered by Secretary Samuel W. Bodman in April 2007 to provide senior-level counsel to DOE's Office

210

DOE/EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota (April 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL IMPACT STATEMENT Deer Creek Station Energy Facility Project Brookings County, South Dakota U.S. Department of Energy Western Area Power Administration Upper Great Plains Region Billings, Montana DOE/EIS-0415 April 2010 Final Environmental Impact Statement Cover Sheet i COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agency: U.S. Department of Agriculture, Rural Utilities Service

211

Microsoft Word - DOE-GJ-97491-952-FINAL DRAFT_S01406.doc  

Office of Legacy Management (LM)

Interim Remedial Action Report Interim Remedial Action Report for the Groundwater Operable Unit of the Weldon Spring Site March 2005 Office of Legacy Management DOE 952 - /GJ/79491 U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy Interim Remedial Action Report for the Groundwater Operable Unit March 2005 DOE/GJ/79491-952 Page iii Contents Acronyms and Abbreviations ..........................................................................................................v Abstract .........................................................................................................................................

212

Microsoft Word - DOE E-Government Act Report 11.16.06 Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-Government Act Report E-Government Act Report Fiscal Year 2006 DOE E-Government Act Report page ii T a b l e o f C o n t e n t s Section 1: Overview of DOE's Implementation of the Act ......................................................... 1 Section 2: Process for Determining Which Information Will Be Made Available on the Internet...................................................................................................................................................... 2 Section 3: Process for How Information Dissemination Activities are Coordinated with FOIA Operations..................................................................................................................................... 3 DOE E-Government Act Report page 1 Section 1: Overview of the Department of Energy's Implementation of the Act

213

Microsoft Word - DOE-CBFO-01-3107 PDP Management Plan_Final  

NLE Websites -- All DOE Office Websites (Extended Search)

CBFO-01-3107 CBFO-01-3107 PERFORMANCE DEMONSTRATION PROGRAM MANAGEMENT PLAN Revision 6 June 2013 U.S. Department of Energy Carlsbad Field Office Office of the National TRU Program This document supersedes DOE/CBFO-01-3107, Revision 5 DOE/CBFO-01-3107 Revision 6 PDP Management Plan June 2013 2 Performance Demonstration Program Management Plan DOE/CBFO-01-3107 Revision 6 June 2013 Approved By: //signature on file// Date: 6-14-13 Office Director Office of the National TRU Program Concurred By: //signature on file// Date: 6-14-13 Office Director Office of Quality Assurance Prepared By: //signature on file// Date: 6-14-13 PDP Appointee Office of the National TRU Program DOE/CBFO-01-3107 Revision 6 PDP Management Plan June 2013

214

Microsoft PowerPoint - 6-03 DOE EM TEM Atlanta AREVA CCIM final 111010.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

November 17, 2010 November 17, 2010 Next-Generation Induction Melter Technology Development DOE EM Waste Processing Technical Exchange, Nov 16-18, 2010, Atlanta, GA Eric Tchemitcheff, AFS Print Close > DOE EM Waste Processing Technical Exchange - Nov 16-18, 2010 - Atlanta, GA 3 Presentation Outline Introduction CCIM Key Attributes CCIM Target Performance for Hanford WTP Applications EM Tank Waste R&D Plan Initiative 5.2.1  Scope and Objectives - CCIM Project CCIM Project - Proposed HLW Tasks and Milestones CCIM Project - Proposed LAW Tasks and Milestones CCIM Project - Summary FY10 Accomplishments CCIM Project - Anticipated Near-term Outcomes CCIM Project - Summary - Focus Areas Print Close > DOE EM Waste Processing Technical Exchange - Nov 16-18, 2010 - Atlanta, GA 4 DOE EM radwaste vitrification processing challenges are

215

DOE Finalizes $1.45 Billion Loan Guarantee for One of the World...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

over 3.3 million homes. Additional DOE-supported projects include the world's largest wind farm and a 2,200 MW nuclear power plant - the nation's first in three decades. For...

216

Microsoft Word - DOE EA 1660 07-21-09_FINAL.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

for the probable maximum flood (DOE 1999); hence, it is not in a floodplain within the meaning of Executive Order No. 11988 (42 FR 26951). As a consequence, there would be no...

217

Microsoft Word - FINAL DOE IRM Strategic Plan_2009-2011_090808.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

IRM Strategic Plan IRM Strategic Plan Office of the Chief Information Officer FY 2009 - 2011 DOE IRM Strategic Plan i FY 2009 - 2011 U.S. Department of Energy IRM Strategic Plan Office of the Chief Information Officer FY 2009 - 2011 DOE IRM Strategic Plan i TABLE OF CONTENTS MESSAGE FROM THE CHIEF INFORMATION OFFICER ..................................................................3 1.0 INTRODUCTION ..........................................................................................................................................4 2.0 IT STRATEGY OVERVIEW ........................................................................................................................4 2.1 DEPARTMENT OF ENERGY MISSION..........................................................................................

218

DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM SSAB » DOE Manual - EM SSAB » DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum requirements for Federal agencies to manage and administer advisory committees. The Manual provides detailed Department of Energy (DOE or Department) requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. DOE Manual - Advisory Committee Management Program

219

DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM SSAB » DOE Manual - EM SSAB » DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum requirements for Federal agencies to manage and administer advisory committees. The Manual provides detailed Department of Energy (DOE or Department) requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. DOE Manual - Advisory Committee Management Program

220

Studies of exotic nuclei with few-nucleon transfer reactions Final Report  

SciTech Connect

This final report summarizes the activities conducted under DOE Grant DE-FG02-04ER41320, titled "Study of exotic nuclei with few-nucleon transfer reactions," A. H. Wuosmaa Principal Investigator.

Wuosmaa, Alan H. [Western Michigan University

2014-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE Issues Final Rule for Alternative Efficiency Determination Methods and Alternative Rating Methods  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has issued a pre-publication Federal Register final rule revising its existing regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air-conditioning, water heating, and refrigeration equipment.

222

DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati -- The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio.

223

Validation studies of the DOE-2 Building Energy Simulation Program. Final Report  

SciTech Connect

This report documents many of the validation studies (Table 1) of the DOE-2 building energy analysis simulation program that have taken place since 1981. Results for several versions of the program are presented with the most recent study conducted in 1996 on version DOE-2.1E and the most distant study conducted in 1981 on version DOE-1.3. This work is part of an effort related to continued development of DOE-2, particularly in its use as a simulation engine for new specialized versions of the program such as the recently released RESFEN 3.1. RESFEN 3.1 is a program specifically dealing with analyzing the energy performance of windows in residential buildings. The intent in providing the results of these validation studies is to give potential users of the program a high degree of confidence in the calculated results. Validation studies in which calculated simulation data is compared to measured data have been conducted throughout the development of the DOE-2 program. Discrepancies discovered during the course of such work has resulted in improvements in the simulation algorithms. Table 2 provides a listing of additions and modifications that have been made to various versions of the program since version DOE-2.1A. One of the most significant recent changes in the program occurred with version DOE-2.1E. An improved algorithm for calculating the outside surface film coefficient was implemented. In addition, integration of the WINDOW 4 program was accomplished resulting in improved ability in analyzing window energy performance. Validation and verification of a program as sophisticated as DOE-2 must necessarily be limited because of the approximations inherent in the program. For example, the most accurate model of the heat transfer processes in a building would include a three-dimensional analysis. To justify such detailed algorithmic procedures would correspondingly require detailed information describing the building and/or HVAC system and energy plant parameters. Until building simulation programs can get this data directly from CAD programs, such detail would negate the usefulness of the program for the practicing engineers and architects who currently use the program. In addition, the validation studies discussed herein indicate that such detail is really unnecessary. The comparison of calculated and measured quantities have resulted in a satisfactory level of confidence that is sufficient for continued use of the DOE-2 program. However, additional validation is warranted, particularly at the component level, to further improve the program.

Sullivan, R.; Winkelmann, F.

1998-06-01T23:59:59.000Z

224

DOE/EIS-0456 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON (FERC PROJECT NO. 460) FINAL ENVIRONMENTAL IMPACT STATEMENT (FERC/EIS-0095F, ADOPTED AS DOE/EIS-0456) US Department of Energy OCTOBER 2010 Lead Agency: U.S. Department of Energy (DOE) Title: Final Environmental Impact Statement (FEIS) for the Cushman Hydroelectric Project, Mason County, Washington (Adopted) Contact: For additional copies or more information on this final environmental impact statement (EIS), please

225

Microsoft Word - DOE Overseas Corps Training Program _Final complete_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/NNSA Overseas Presence Advisory Board's DOE/NNSA Overseas Presence Advisory Board's Overseas Corps Training Program Agreement Purpose of Training Program under this Agreement The Department of Energy provides workforce resources to support the Department's mission and strategic plan objectives and requirements in overseas assignments. The individuals and their families carrying out these assignments need to be prepared to work with other Federal agencies, such as the Departments of State (DOS) and Defense (DOD), and with representatives of foreign governments, non-profit organizations, and commercial enterprises. Prior to the beginning, and while carrying out, the assignment, appropriate training will help ensure the achievement of the Departmental mission objectives. The primary mission of the DOE Overseas

226

Microsoft Word - Transmission - DOE lead agency NOPR - Final EEI comments 2-24-12  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 24, 2012 February 24, 2012 Mr. Brian Mills Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted via email to: Brian.Mills@hq.doe.gov Re: Coordination of Federal Authorizations for Electric Transmission Facilities, Notice of Proposed Rulemaking, RIN 1901-AB18, 76 Fed. Reg. 77432 (Dec. 13, 2011) Dear Mr. Mills: I. INTRODUCTION The Edison Electric Institute (EEI) is pleased to provide these comments to the Department of Energy (DOE) in response to the above-referenced notice of proposed rulemaking (NOPR) for implementing Federal Power Act (FPA) section 216(h), which was enacted as part of section 1221 of the Energy Policy Act of 2005 (EPAct). The NOPR proposes to amend, and incorporates comments received in response to, DOE's

227

Final report for DOE grant FG02-06ER15805  

SciTech Connect

DOE funding was used to investigate the role of the phosphotransferase system (PTS) in the symbiotic, nodulating bacterium Sinorhizobium meliloti. This system is well studied in several bacterial species. However, it??s organization and function in S. meliloti is substantially different than in the those other, well-studied bacteria. The S. meliloti PTS, through our DOE-funded work, has become a model for how this important signal transduction system works in the a-proteobacteria. We have found that the PTS is relatively simple, used for only signal transduction and not transport, and is involved in regulation of carbon metabolism in response to carbon availability and nitrogen availability.

Daniel Gage

2012-05-31T23:59:59.000Z

228

Microsoft Word - DOE E-Government Act Report 2009 Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 U.S. Department of Energy T a b l e o f C o n t e n t s Section I: Transparency, Engagement, and Innovation .............................................................. 1 Section II: Information & Information Technology Management .............................................. 3 Section III: Implementation of E-Government Initiatives............................................................. 7 DOE E-Government Act Report page 1 Section I: Transparency, Engagement, and Innovation 1. Describe major transparency initiatives undertaken in the past year and major transparency initiatives planned for the coming year; The Department of Energy (DOE) has undertaken two major transparency initiatives: The Open Energy Information Platform (www.openEI.org) - As part of our efforts to promote clean

229

DOE/EA-1440-S-1: Final Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's South Table Mountain Complex (May 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL ASSESSMENT OF THE NATIONAL RENEWABLE ENERGY LABORATORY'S SOUTH TABLE MOUNTAIN COMPLEX Proposed Construction and Operation of: - Research Support Facilities, - Infrastructure Improvements (Phase I), - Upgrades to the Thermochemical User Facility and Addition of the Thermochemical Biorefinery Pilot Plant May 2008 U . S . D e p a r t m e n t o f E n e r g y G o l d e n F i e l d O f f i c e N a t i o n a l R e n e w a b l e E n e r g y L a b o r a t o r y 1 6 1 7 C o l e B o u l e v a r d G o l d e n , C o l o r a d o 8 0 4 0 1 DOE/EA-1440-S-1 Department of Energy Golden Field Office 161 7 Cole Boulevard Golden, Colorado 80401 -3305 May 14,2008 FINDING OF NO SIGNIFICANT IMPACT for SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL ASSESSMENT OF THE NATIONAL RENEWABLE ENERGY LABORATORY'S

230

Does  

NLE Websites -- All DOE Office Websites (Extended Search)

Does Does the cellulose-binding module move on the cellulose surface? Yu-San Liu Æ Yining Zeng Æ Yonghua Luo Æ Qi Xu Æ Michael E. Himmel Æ Steve J. Smith Æ Shi-You Ding Received: 26 November 2008 / Accepted: 11 May 2009 / Published online: 19 June 2009 Ó Springer Science+Business Media B.V. 2009 Abstract Exoglucanases are key enzymes required for the efficient hydrolysis of crystalline cellulose. It has been proposed that exoglucanases hydrolyze cellulose chains in a processive manner to produce primarily cellobiose. Usually, two functional modules are involved in the processive mechanism: a catalytic module and a carbohydrate-binding module (CBM). In this report, single molecule tracking techniques were used to analyze the molecular motion of CBMs labeled with quantum dots (QDs) and bound to cellulose crystals. By tracking the single QD, we observed that the family 2 CBM from

231

Final report of DOE project "Detection, Localization and Diagnosis of Performance Problems Using PerfSONAR"  

SciTech Connect

We present the development of a middleware service, called Pythia, that is able to detect, localize, and diagnose performance problems in the network paths that interconnect research sites that are of interest to DOE. The proposed service can analyze perfSONAR data collected from all participating sites.

Dovrolis, Konstantinos [Georgia Tech

2014-04-15T23:59:59.000Z

232

DOE final report, phase one startup, Waste Receiving and Processing Facility (WRAP)  

SciTech Connect

This document is to validate that the WRAP facility is physically ready to start up phase 1, and that the managers and operators are prepared to safely manage and operate the facility when all pre-start findings have been satisfactorily corrected. The DOE Readiness Assessment (RA) team spent a week on-site at Waste Receiving and Processing Module 1 (WRAP-1) to validate the readiness for phase 1 start up of facility. The Contractor and DOE staff were exceptionally cooperative and contributed significantly to the overall success of the RA. The procedures and Conduct of Operations areas had significant discrepancies, many of which should have been found by the contractor review team. In addition the findings of the contractor review team should have led the WRAP-1 management team to correcting the root causes of the findings prior to the DOE RA team review. The findings and observations include many issues that the team believes should have been found by the contractor review and corrective actions taken. A significantly improved Operational Readiness Review (ORR) process and corrective actions of root causes must be fully implemented by the contractor prior to the performance of the contractor ORR for phase 2 operations. The pre-start findings as a result of this independent DOE Readiness Assessment are presented.

Jasen, W.G.

1998-01-07T23:59:59.000Z

233

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

234

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

235

DOE/EA-1607: Final Environmental Assessment for Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium (June 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

μCi/cc microcuries per cubic centimeter μCi/cc microcuries per cubic centimeter MAP mitigation action plan MEI maximally exposed individual mg/kg milligrams per kilogram mrem millirem mSv millisievert MT metric ton MTCA Model Toxics Control Act MTU metric tons of uranium N/A not applicable Final Environmental Assessment: Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium vi NAAQS National Ambient Air Quality Standards NEF National Enrichment Facility NEPA National Environmental Policy Act NRC U.S. Nuclear Regulatory Commission NU natural uranium NUF 6 natural uranium hexafluoride pCi/g picocuries per gram PEIS programmatic environmental impact statement PM 2.5 particulate matter with a diameter of 2.5 microns or less PM 10 particulate matter with a diameter of 10 microns or less

236

AHAM Comments_DOE Reg Review Sept 2012_FINAL.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 7, 2012 September 7, 2012 By E-Mail Daniel Cohen Assistant General Counsel for Legislation, Regulation, and Energy Efficiency U.S. Department of Energy Office of the General Counsel 1000 Independence Ave., SW Washington, D.C. 20585 Regulatory.Review@hq.doe.gov Re: Regulatory Burden RFI Dear Mr. Cohen: The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 47328 (Aug. 8, 2012). AHAM represents manufacturers of major, portable and floor care home appliances, and suppliers to the industry. AHAM's more than 150 members employ tens of thousands of people in the U.S. and produce more than 95% of the household appliances shipped for sale within the

237

DOE RFI Policy & Logistical Challenges_PHI_response_vFinal_logo  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EP9425 EP9425 701 9th St NW Washington, DC 20068 202 872-3227 202 872-3302 Fax wmgausman@pepco.com William M. Gausman Senior Vice President Strategic Initiatives November 1, 2010 US Department of Energy Office of Electricity Delivery and Energy Reliability 1000 Independence Avenue, SW Room 8H033 Washington, DC 20585 RE: Smart Grid RFI: Addressing Policy and Logistical Challenges Pepco Holdings, Inc. (PHI) is pleased to respond to the US Department of Energy (DOE) request for information regarding addressing policy and logistical challenges to smart grid implementation. This follows on the heels of PHI's responses to two other DOE RFls on data access and communications requirements. PHI is one of the largest energy delivery companies in the Mid-Atlantic region. PHI's three

238

FINAL_Comments on 2012 Congestion study filed w_DOE 1_30_2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

750 1 750 1 st St, NE Suite 1100 Washington, DC 20002 202.682.6294 Main 202.682.3050 Fax www.cleanskies.org January 30, 2012 Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Ave., S.W. Washington, D.C. 20585 Sent by email to: Congestionstudy2012@hq.doe.gov David.Meyer@hq.doe.gov RE: Preparation of the 2012 Congestion Study The American Clean Skies Foundation (ACSF) is a non-profit organization founded to advance America's energy security and promote a cleaner environment through the expanded use of natural gas, renewable energy and energy efficiency. ACSF appreciates the opportunity to submit these comments, which underscore the importance of taking into account the growing role of natural gas-fired electric generation in connection with transmission planning.

239

Microsoft Word - DOE E-Government Act Report FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-Government Act Report E-Government Act Report Fiscal Year 2007 U.S. Department of Energy T a b l e o f C o n t e n t s Section 1: Agency Information Management Activities ............................................................. 1 Section 2: Implementation of Electronic Government Initiative: ............................................. 3 DOE E-Government Act Report page 1 Section 1: Agency Information Management Activities 1. Below are links to the Department of Energy's (DOE) website to obtain the following information as required by the E-Government Act of 2002 (P.L. No. 107-347) (Act): A. The contents required of your agency's Information Resources Management (IRM) Strategic Plan per the Office of Management and Budget (OMB) Memorandum 06-02 "Improving Public Access to and Dissemination of

240

Microsoft Word - DOE_FinalReport_12-26-2012a  

Office of Scientific and Technical Information (OSTI)

TECHNICAL REPORT Biomass to Gasoline and Diesel Using Integrated Hydropyrolysis and Hydroconversion Reporting Period: April 1, 2010 through December 1, 2012 DOE Award Number: U.S. DOE Award DE-EE-0002873 Revised: December 28, 2012 Prepared For: U.S. Department of Energy GTI Technical Contact: Michael Roberts, Project Manager 847-768-0518; mike.roberts@gastechnology.org Terry Marker, Principal Investigator 847-544-3491; terry.marker@gastechnology.org Contributors: GTI: Terry Marker; Martin Linck; Larry Felix; Pedro Ortiz-Toral; Jim Wangerow CRI-Criterion: Larry Kraus; Celeste McLeod; Alan DelPaggio NREL: Eric Tan Johnson Timber: John Gephart Cargill: Dmitri Gromov; Ian Purtle; Jack Starr; John Hahn Aquaflow: Paul Dorrington Blue Marble: James Stevens

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DOE-ER-46139-Phase II-Final-Report-Tritt-2011  

SciTech Connect

This proposal emphasizes investigations of the thermal and electrical transport properties of new and novel solid-state materials, with the specific goal of achieving higher efficiency solid-state thermoelectric materials. This program will continue to build a very strong collaborative research effort between researchers at Oak Ridge National Laboratory (ONRL) and Clemson University. We propose three new faculty hires and major equipment purchases in order to further enhance our level of national recognition. We will be positioned for competition for major non-EPSCoR DOE and DOD funding (i.e. NSF-Materials Research Center) and able to address many other areas of DOE and national importance. Graduate and undergraduate students will be extensively involved in this project, spending significant time at ORNL, thus gaining important training and educational opportunities. We will also include an outreach program to bring in outside students and faculty. An External Advisory Board of distinguished scientists will provide oversight to the program.

Terry M. Tritt (PI)

2011-10-21T23:59:59.000Z

242

SRS Biomass Startup NR-03 12 12 - DOE FINAL.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTACTS FOR IMMEDIATE RELEASE CONTACTS FOR IMMEDIATE RELEASE Amy Caver (803) 952-7213 March 12, 2012 amy.caver@srs.gov CarolAnn Hibbard, (508) 661-2264 news@ameresco.com SRS MARKS SUCCESSFUL OPERATIONAL STARTUP OF NEW BIOMASS COGENERATION FACILITY Senior DOE Officials and SC Congressional Leadership Gather to Celebrate Major Renewable Energy Project AIKEN, S.C. - (March 12) Today, Under Secretary of Energy Thomas D'Agostino joined U.S. Representative

243

DOE/EA-1557; Final Envrionmental Assessment for the National Security Test Range  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for the National Security Test Range DOE/EA-1557 April, 2007 CONTENTS 1. PURPOSE AND NEED ..................................................................................................................... 1 2. ALTERNATIVES .............................................................................................................................. 3 2.1. Consolidate Testing on a New National Security Test Range at the INL (Preferred Alternative)3 2.1.1 Construction Activities ................................................................................................. 6 2.1.2 Operational Activities................................................................................................... 6 2.2 Alternatives Considered, but Eliminated from Detailed Analysis................................................

244

DOE/EA-1622: Final Environmental Assessment for University of Nevada, Las Vegas Research Foundation Solar Technology Center (January 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

University of Nevada, Las Vegas University of Nevada, Las Vegas Research Foundation SOLAR TECHNOLOGY CENTER January 2009 Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1622 U.S. Department of Energy Golden Field Office National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 This Environmental Assessment was prepared on behalf of the U.S. Department of Energy by the University of Nevada, Las Vegas Research Foundation with contractual assistance from Ninyo & Moore, Inc. and MBP Consulting, LLC. Finding of No Significant Impact Solar Technology Center January 2009 Finding of No Significant Impact Solar Technology Center January 2009 Finding of No Significant Impact Solar Technology Center

245

EA-1113: Final Environmental Assessment (Addendum) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

113: Final Environmental Assessment (Addendum) 113: Final Environmental Assessment (Addendum) EA-1113: Final Environmental Assessment (Addendum) Proposed Title Transfer of Parcel ED-1 The U.S. Department of Energy (DOE) has completed an Environmental Assessment (EA) Addendum (DOE/EA-1113-A) in response to a proposal from Horizon Center LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), requesting transfer of title of the presently leased Parcel ED-1 (also known as Horizon Center) in order to continue to support economic development in the region. Environmental Assessment Addendum for the Proposed Title Transfer of Parcel ED-1, DOE/EA-1113-A (April 2003) More Documents & Publications EA-1113: Finding of No Significant Impact (Addendum) EA-1175: Final Environmental Assessment (Addendum)

246

Coyote Springs Cogeneration Project - Final Environmental Impact Statement and Record of Decision (DOE/EIS-0201)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coyote Springs Cogeneration Project - Final Environmental Impact Statement Coyote Springs Cogeneration Project - Final Environmental Impact Statement Summary-1 Summary Bonneville Power Administration (BPA) is a Federal power marketing agency in the U.S. Department of Energy. BPA is considering whether to transmit (wheel) electrical power from a proposed privately-owned, gas-fired combustion turbine power generation plant in Morrow County, Oregon. The proposed power plant would have two combustion turbines that would generate 440 average megawatts (aMW) of energy when completed. The proposed plant would be built in phases. The first combustion turbine would be built as quickly as possible. Timing for the second combustion turbine is uncertain. As a Federal agency subject to the Nation Environ- mental Policy Act, BPA must complete a review of environmental impacts before it makes a

247

Microsoft Word - Final DOE BY 2012 IT Reporting Instructions_September 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Technology (IT) Reporting Format and Requirements for the BY 2012 Budget Submission Based on the Final Office of Management and Budget (OMB's) Circular A-11 for the BY 2012 Exhibit 300 and Exhibit 53 September 2010 Table of Contents 1. Purpose........ ..................................................................................................................2 2. Sections of the Exhibit 53 A ...........................................................................................2 3. Exhibit 53 A Component Descriptions and Instructions ................................................5 4. Exhibit 53 B Component Descriptions and Instructions................................................13 5. Cost Estimation ..............................................................................................................15

248

DOE  

Gasoline and Diesel Fuel Update (EIA)

DOE DOE /E/A- 0202( 83//Q J Sh or t-T er m En er gy O ut lo ok a to m Quar terly Proje ction s Febru ary 1983 Ene rgy Info rma tion Adm inist ratio n Was hing ton, D.C. t rt jrt .or t lor t lor t .lor t- ior t- ior t <.o rt ort . m .er m -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -T erm -T erm -T erm Nrm ue rgy En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y ^n erg y Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Sh ort -T erm 1 Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm

249

Microsoft PowerPoint - DOE PCA Training (Executive Overview) 10-31-06 Final.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 31, 2006 October 31, 2006 Department of Energy Post Competition Accountability (PCA) Training Module 1: Executive PCA Training Opening Remarks Opening Remarks 3 Post Competition Accountability (PCA) Training Module 1: Executive PCA Training Module 2: PCA Practitioner's Training Module 3: Quality Assurance Surveillance Training Module 4: Quality Control Evaluator Training Module 5: Service Provider (SP) PCA Toolkit 4 Training Objectives Understand OMB PCA Requirements Understand DOE PCA Roles and Responsibilities Understand the Execution of PCA 5 PCA Training Agenda PCA Overview OMB Circular A-76 PCA Requirements Roles and Responsibilities Requirements for Measuring Cost & Performance How do we Measure Cost & Performance? Independent Validation and Verification (IV&V)

250

Microsoft Word - MOTcmnts to DOE 7 12 10 master-final draft 2 clean.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF MOTOROLA, INC. Motorola, Inc. ("Motorola") hereby responds to the National Broadband Plan Request for Information (" NBP RFI") on the communications requirements of utilities, including but not limited to requirements for Smart Grid. 1 Motorola supports the efforts of the Department of Energy ("DOE") to fully assess utilities' requirements before the communications solutions for Smart Grid and other requirements are addressed. Based on Motorola's experience in providing communications systems for utilities, public safety, enterprise, and business users, as well as for commercial carriers and the general public, it is clear that there is no substitute for understanding the user needs first and then applying viable technology solutions to meet those needs.

251

Impact of DOE Orders on Waste Management Operation. Volume 1: [Final report  

SciTech Connect

Department of Energy Orders are the internal documents which govern the management of all Department of Energy facilities and operations. DOE Orders are the vehicles by which Federal and state laws and regulations are applied to Department of Energy activities. A selected set of 22 Department of Energy Orders was reviewed to identify the applicability and impact of each Order on waste management operations at Los Alamos National Laboratory. Of the 22 Orders reviewed, five set forth requirements which have a high degree of impact on waste management activities. Eight Orders have a moderate degree of impact on waste management activities, and the remaining nine Orders have a low degree of impact.

Klein, R.B.; Jennrich, E.A.; Shuman, R.; Sandquist, G.M. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States); Rutz, A.C.; Littleton, M.W.; McCauce, C.H. [Wastren, Inc., Idaho Falls, ID (United States)

1989-09-01T23:59:59.000Z

252

"FutureGen 2.0 Project Final Environmental Impact Statement Summary"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COVER SHEET COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Final Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

253

National Ignition Facility Title II Design Plan  

SciTech Connect

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

254

Final Report for the DOE Chemical Hydrogen Storage Center of Excellence  

NLE Websites -- All DOE Office Websites (Extended Search)

FINAL FINAL R EPORT F OR T HE D OE C HEMICAL HYDROGEN S TORAGE C ENTER O F EXCELLENCE Kevin C . O tt, C enter D irector LOS A LAMOS N ATIONAL L ABORATORY PO B ox 1 663 Los A lamos, N M 8 7545 Summarizing C ontributions f rom C enter P artners: Los A lamos N ational L aboratory ( LANL) Pacific N orthwest N ational L aboratory ( PNNL) Millennium C ell, I nc. Northern A rizona U niversity Rohm a nd H aas/Dow C hemical C ompany University o f A labama University o f C alifornia, D avis University o f C alifornia, L os A ngeles/University o f M issouri University o f O regon Pennsylvania S tate U niversity University o f P ennsylvania University o f W ashington U.S. B orax C orporation Intematix C orporation This f inal r eport w as p repared w ith t he a ssistance o f T om A utrey ( PNNL), a nd F ran Stephens ( LANL) w ho p repared

255

Microsoft Word - WACR_calibration_report_final_DOE-SC-ARM-TR-089.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

TR-089 TR-089 WACR Calibration Study J Mead March 2010 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

256

Microsoft Word - FPL Response to DOE Smart Grid Communications RFI Final Version 071210.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 Page 1 July 12, 2010 U.S. Department of Energy Office of the General Counsel ATTN: NBP RFI: Communications Requirements 1000 Independence Avenue, SW Room 6A245 Washington, DC 20585 Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Introduction A wholly-owned subsidiary of NextEra Energy, Inc., Florida Power & Light Company (FPL) is a public utility incorporated in the State of Florida that provides wholesale and retail electric service. It is one of the largest and best-performing electric utilities in the nation. In 2008, FPL served 4.5 million customer accounts over a 27,000 square mile service territory, delivering electricity to

257

Microsoft Word - DOE-ER-0670T_6.09_Final.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

ER-0670T ER-0670T UC-402 Science Plan for the Atmospheric Radiation Measurement Program (ARM) February 1996 United States Department of Energy Office of Energy Research Office of Health and Environmental Research Environmental Sciences Division Washington, DC 20585 ARM Science Plan iii Executive Summary The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE's programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: 1. Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including

258

Final Report for DOE Project DE-FC07-99CH11010  

SciTech Connect

Department of Energy award number DE-FC07-99CH11010, Enhanced Utilization of Corn Based Biomaterials, supported a technology development program sponsored by Cargill Dow LLC from September 30, 1999 through June 30, 2003. The work involved fundamental scientific studies on poly lactic acid (PLA), a new environmentally benign plastic material from renewable resources. DOE funds supported academic research at the Colorado School of Mines and the National Renewable Energy Laboratory (NREL), and industry cost share was directed towards applied research into new product development utilizing the fundamental information generated by the academic partners. Under the arrangement of the grant, the fundamental information is published so that other companies can utilize it in evaluating the applicability of PLA in their own products. The overall project objective is to increase the utilization of PLA, a renewable resource based plastic, currently produced from fermented corn sugar.

Jed Randall; Robert Kean

2003-10-22T23:59:59.000Z

259

Microsoft Word - DOE Fed Bldg Sust Design Princ 10-08-12 FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 12, 2010 Mr. Cyrus Nasseri U.S. Department of Energy Federal Energy Management Program Mailstop EE-2L 1000 Independence Avenue, SW Washington, DC 20585-0121 Cyrus.Nasseri@ee.doe.gov Via E-mail and eRulemaking Portal Re: Notice of proposed rulemaking, Energy Efficiency and Sustainable Design Standards for New Federal Buildings, 75 Fed. Reg. 29,933 (May 28, 2010) Docket No. EE-RM/STD-02-112 RIN 1904-AC13 Earthjustice respectfully submits the following comments on behalf of Natural Resources Defense Council, the Sierra Club, the D.C. Environmental Network, and Public Citizen. For the benefit of their members and the public, each of these organizations shares a

260

Microsoft Word - NonProprietary DOE MicroCHP Final Report.doc  

Office of Scientific and Technical Information (OSTI)

Micro-CHP Systems for Residential Applications Micro-CHP Systems for Residential Applications Final Report June 2006 Prepared by United Technologies Research Center 411 Silver Lane East Hartford, CT 06108 Prepared for U.S. Department of Energy National Energy Technology Laboratory Contract No. DE-FC26-04NT42217 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Technical Contact: Timothy DeValve, Benoit Olsommer UTRC Micro-CHP Project Leaders (860) 610-7286, (860) 610-7463 devalvtd@utrc.utc.com, olsommbc@utrc.utc.com DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Microsoft Word - FINAL_Rev20 05.31.07 DOE Report.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring to Improve Monitoring to Improve Combustion Turbine/Combined Cycle Reliability, Availability & Maintainability Final Report Reporting Period Start Date: October 01, 2001 Reporting Period End Date: September 30, 2005 Agreement Number: DE-FC26-01NT41233 Submitted by: ELECTRIC POWER RESEARCH INSTITUTE (EPRI) 3420 Hillview Avenue, Palo Alto, California 94304-1395 PO Box 10412, Palo Alto, California 94303-0813 ▪ USA EPRI Principal Investigator: Leonard Angello Phone: 650-855-7939; Email: LAngello@EPRI.com DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES THIS REPORT WAS PREPARED AS AN ACCOUNT OF WORK SPONSORED BY AN AGENCY OF THE UNITED STATES GOVERNMENT. NEITHER THE UNITED STATES GOVERNMENT NOR ANY AGENCY THEREOF, NOR ANY OF THEIR EMPLOYEES, MAKES ANY WARRANTY, EXPRESS OR

262

Final Environmental Impact Statement Nez Perce Tribal Hatchery Program (DOE/EIS-0213)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Summary Naturally-reproducing salmon are adult fish that spawn in a stream or river. Wild salmon are defined in this document as fish that have not spent any part of their life history in an artificial environment, and are the progeny of naturally- reproducing salmon regardless of parentage. For example, the progeny of hatchery fish that have been raised in the wild are considered wild. This distinction is made so that spring chinook in the Clearwater can be defined as wild. Ü For Your Information * The Purpose and Need for Action * Alternatives * Comparison of Alternatives and Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other

263

Final Environmental Impact Statement Nez Perce Tribal Hatchery Program (DOE/EIS-0213)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Summary Naturally-reproducing salmon are adult fish that spawn in a stream or river. Wild salmon are defined in this document as fish that have not spent any part of their life history in an artificial environment, and are the progeny of naturally- reproducing salmon regardless of parentage. For example, the progeny of hatchery fish that have been raised in the wild are considered wild. This distinction is made so that spring chinook in the Clearwater can be defined as wild. Ü For Your Information * The Purpose and Need for Action * Alternatives * Comparison of Alternatives and Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other

264

Columbia River Gorge Vegetation Management Project Final Environmental Assessment DOE/EA-1162  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COLUMBIA COLUMBIA RIVER MANAGEMENT PR GORGE OJECT VEGETAT ON Final Environmental Assessment DO E/EA-l 162 BONNEVILLE row,. ..", ",,,,.,,0. W x ? -- -- ------ .- .-- b I . , (, I I I ( t ,1 ,0 , . ,' I , ,- , !" 1 , I I ,; ,, 1 1 I .1 . . COLUMBIA RIVER GORGE VEGETATION MANAGEMENT ENVIRONMENTAL ASSESSMENT (Hanford-Ostrander and North BonnevilI&Midway Transmission Line Rights-of-Way) Table of Contents Page . 2 3 pqose and Need Background hbfic evolvement Swq ' ' Decbions to Be Made PROPOSED A~ON AND ~~RNA~S Mtemative k No Action " Manual, Mechnical, and Biological Metbh - Ntemative W. Proposed Action- htegrated Vegetation Management ~) tih Herbicides Herbici& Meth& -. PhedActions Comparison of Mtematives ~ . . . . . . ti~D E~OW~ ~ E_O_~m .. CONSEQ~N~S Affmd Environment . Environment Consquen~ hti Use Soils Vegetation Water Resources WildlfeResources Air Quali@lGlobal Warning

265

Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , Final for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards . Environmental Assessment Prepared for Southwestern Power Administration U.S. Department of Energy - _ . . . " Prepared by Black & Veatch October 13,1995 ' Table of Contents 1 . 0 Purpose and Need for Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 Description of the Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Alternative 1 . No Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Alternative 2 . Mechanical and Manual Control . . . . . . . . . . . . . . . . . . . 2.3 Alternative 3 . Proposed Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Foliar Spray Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Soil-Spot Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

266

DOE SBIR Phase II Final Report: Distributed Relevance Ranking in Heterogeneous Document Collections  

SciTech Connect

This report contains the comprehensive summary of the work performed on the SBIR Phase II project (Distributed Relevance Ranking in Heterogeneous Document Collections) at Deep Web Technologies (http://www.deepwebtech.com). We have successfully completed all of the tasks defined in our SBIR Proposal work plan (See Table 1 - Phase II Tasks Status). The project was completed on schedule and we have successfully deployed an initial production release of the software architecture at DOE-OSTI for the Science.gov Alliance's search portal (http://www.science.gov). We have implemented a set of grid services that supports the extraction, filtering, aggregation, and presentation of search results from numerous heterogeneous document collections. Illustration 3 depicts the services required to perform QuickRank filtering of content as defined in our architecture documentation. Functionality that has been implemented is indicated by the services highlighted in green. We have successfully tested our implementation in a multi-node grid deployment both within the Deep Web Technologies offices, and in a heterogeneous geographically distributed grid environment. We have performed a series of load tests in which we successfully simulated 100 concurrent users submitting search requests to the system. This testing was performed on deployments of one, two, and three node grids with services distributed in a number of different configurations. The preliminary results from these tests indicate that our architecture will scale well across multi-node grid deployments, but more work will be needed, beyond the scope of this project, to perform testing and experimentation to determine scalability and resiliency requirements. We are pleased to report that a production quality version (1.4) of the science.gov Alliance's search portal based on our grid architecture was released in June of 2006. This demonstration portal is currently available at http://science.gov/search30 . The portal allows the user to select from a number of collections grouped by category and enter a query expression (See Illustration 1 - Science.gov 3.0 Search Page). After the user clicks search a results page is displayed that provides a list of results from the selected collections ordered by relevance based on the query expression the user provided. Our grid based solution to deep web search and document ranking has already gained attention within DOE, other Government Agencies and a fortune 50 company. We are committed to the continued development of grid based solutions to large scale data access, filtering, and presentation problems within the domain of Information Retrieval and the more general categories of content management, data mining and data analysis.

Abe Lederman

2007-01-08T23:59:59.000Z

267

Removal of Technetium, Carbon Tetrachloride, and Metals from DOE Properties - Final Report  

SciTech Connect

This research is a three year project involving close collaboration between chemists at Pennsylvania State University and materials scientists at Pacific Northwest National Laboratory (PNNL). The goal of the project is the development and characterization of supported reducing agents, and solid waste forms derived from them, which will be effective in remediation of aqueous wastes. The work follows the recent discovery that zero-valent metals, such as iron, are effective decontaminants for waste streams containing chlorinated hydrocarbons. Preliminary data, obtained at Penn State and elsewhere, have shown that the same strategy will be effective in reducing soluble compounds containing toxic metals (technetium, lead, mercury, and chromium) to insoluble forms. The Penn State group has prepared a new class of powerful reducing agents, called Ferragels, which consist of finely divided zero-valent metals on high surface area supports. Because the rate of the surface oxidation-reduction reaction depends on available surface area, Ferragels are more effective in every case tested to date than unsupported metals. The project will further develop and investigate the application of these composite materials to problems relevant to the DOE-EM mission, namely the detoxification of waste streams containing technetium, carbon tetrachloride, and toxic metal ions. The Penn State group will work closely with the PNNL group to prepare materials that are compatible with the highly corrosive liquid fraction of Hanford site tank waste, to conduct tests with waste simulants containing technetium, and to formulate and characterize vitrified waste forms derived from these materials.

Mallouk, Thomas E.

2000-09-01T23:59:59.000Z

268

The DOE infrastructure support program at the University of Texas at El Paso. Final report  

SciTech Connect

The University of Texas at El Paso (UTEP) is located on 300 acres, only a few hundred years from the US/Mexico border. The DOE Infrastructure Support Program was initiated at UTEP in 1987. The purpose of the program was to assist the University in building the infrastructure required for its emerging role as a regional center for energy-related research. Equally important was the need to strength the University`s ability to complete for sponsored energy-related programs at the state and national levels and to provide opportunities for faculty, staff and students to participate in energy-related research and outreach activities. The program had four major objectives, as follows: (1) implement energy research, outreach and demonstration projects already funded, and prepare new proposals to fund university research interests; (2) establish an Energy Center as a separate operational entity to provide continuing infrastructure support for energy-related programs; (3) strengthen university/private sector energy research linkages; and (4) involve minority graduate and undergraduate students in energy research and outreach activities. Each of the above objectives has been exceeded substantially, and, as a consequence, the University has become a regional leader in energy and environmental research and outreach efforts.

NONE

1998-11-01T23:59:59.000Z

269

DOE/EA-1651: Final Environmental Assessment for U-233 Material Downblending and Disposition Project at the Oak Ridge National Laboratory Oak Ridge, Tennessee (January 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 51 Final Environmental Assessment for U-233 Material Downblending and Disposition Project at the Oak Ridge National Laboratory Oak Ridge, Tennessee U. S. Department of Energy Oak Ridge Office Oak Ridge, Tennessee January 2010 FINDING OF NO SIGNIFICANT IMPACT URANIUM-233 MATERIAL DOWNBLENDING AND DISPOSITION PROJECT AT THE OAK RIDGE NATIONAL LABORATORY, OAK RIDGE, TENNESSEE AGENCY: U.S. Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: DOE has completed the Final Environmental Assessment for U-233 Material Downblending and Disposition Project at the Oak Ridge National Laboratory [DOE/EA-1651]. This environmental assessment (EA) evaluates the impacts of planned activities to modify selected

270

DOE Chair of Excellence in Environmental Disciplines-Final Technical Report  

SciTech Connect

The report Massie Chair of Excellence Program at Universidad del Turabo, contract DE-FG02-95EW12610, during the period of 9/29/1995 to 9/29/2011. The initial program aims included development of academic programs in the Environmental Sciences and Engineering, and Research and Development focused initially on environmentally friendly processes and later revised also include: renewable energy and international cooperation. From 1995 -2005, the Program at UT lead the establishment of the new undergraduate program in electrical engineering at the School of Engineering (SoE), worked on requirements to achieve ABET accreditation of the SoE B.S. Mechanical Engineering and B.S. Electrical Engineering programs, mentored junior faculty, taught undergraduate courses in electrical engineering, and revised the electrical engineering curriculum. Engineering undergraduate laboratories were designed and developed. The following research sub-project was developed: Research and development of new perovskite-alumina hydrogen permeable asymmetrical nanostructured membranes for hydrogen purification, and extremely high specific surface area silica materials for hydrogen storage in the form of ammonia, Dr. Rolando Roque-Malherbe Subproject PI, Dr. Santander Nieto and Mr. Will Gmez Research Assistants. In 2006, the Massie Chair of Excellence Program was transferred to the National Nuclear Security Agency, NNSA and DNN. DoE required a revised proposal aligned with the priorities of the Administration. The revised approved program aims included: (1) Research (2) Student Development: promote the development of minority undergraduate and graduate students through research teams, internships, conferences, new courses; and, (3) Support: (a) Research administration and (b) Dissemination through international conferences, the UT Distinguished Lecturer Series in STEM fields and at the annual Universidad del Turabo (UT) Researchers Conference. Research included: Sub-Project 1: Synthesis and Characterization of low Refractive Index Aerogel Silica for Cherenkov Counters- Dr. Rolando Roque-Malherbe Sub-project PI, Dr. Jose Duconge Sub-project Co-PI, Dr. Santander Nieto Assistant Researcher, Francisco Diaz and Carlos Neira Associate Researchers. The initial aim of this sub-project was changed to the synthesis and characterization of extremely high specific surface area aerogel silica for gas storage. A high specific surface area silica gel that has applications in gas drying, cleaning operation useful in nuclear industry in process was developed. Sub-Project 2: Investigation Study of Magnetic and Electronic Transport Properties at Material Interfaces in Magnetic Multilayer Heterostructure using Gd. Dr. Yazan Hijazi, Sub-project Co-PI. UT developed the capability and infrastructure to produce high quality thin-film magnetic films and magnetic multilayer structures with fine control over film quality and thickness using sputter deposition capability to perform in-house electric and magnetic characterization of these films. The research experimentally quantified the effect of Gd incorporation within the magnetic multilayer structure and produce magnetic media with exchanged decoupled multilevel magnetic anisotropy. From September 2006 to September 2011 the Massie Chair produced nineteen (19) publications, (including 3 books), five (5) presentations and three (3) international conferences abstracts. A total of fourteen (14) undergraduates and (6) graduate students acquired research experience. Two Ph.D. students presented their dissertations on topics related to nuclear energy and graduated as follows: Mara Cotto (May 2009) and Eric Caldern (May 2011). Five of the participating undergraduate students graduated: Ramon Polanco (BSME, May 2009), Jason Prez (BSEE, May 2008), Rafael Coln (BSME, May 2008), Jessenia Marfisi (BS Chemistry, May 2008). Eleven (11) students were sent to National Laboratories (LANL, SNL and LLNL), NNSA and DoE facilities for summer internships. Twenty eight (28) undergraduate students participated in Summer Internships (2010,

Kurunganty, Sastry; Lorn, Roberto; Roque-Malherbe, Rolando; Hijazi, Yazan; Nieto, Santander; Gmez, Will A.; Ducong, Jos; Cotto, Mara del C.; Muiz, Carlos; Daz, Francisco J.; Neira, Carlos F.; Mrquez, Francisco; Del Valle, W.; Thommes, M.

2014-02-19T23:59:59.000Z

271

Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (DOE/EIS-0287) (11/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

811 Federal Register 811 Federal Register / Vol. 71, No. 228 / Tuesday, November 28, 2006 / Notices Information Relay Service (FIRS) at 1-800-877-8339. [FR Doc. E6-20124 Filed 11-27-06; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF ENERGY Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement AGENCY: Department of Energy. ACTION: Amended Record of Decision. SUMMARY: The U.S. Department of Energy (DOE) is amending its Record of Decision (ROD) published December 19, 2005 (70 Federal Register [FR] 75165), pursuant to the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (Final EIS) (DOE/EIS-0287, September 2002). The Final EIS analyzed two sets of alternatives for accomplishing DOE's

272

DOE/EIS-0197-SA-01; Delivery of the Canadian Entitlement Final Environmental Impact Statement Supplement to Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivery of the Canadian Entitlement Delivery of the Canadian Entitlement Final Environmental Impact Statement Supplement to Record of Decision Summary The United States Entity has decided to supplement an earlier decision regarding the Canadian Entitlement. The United States Entity issued a Delivery of the Canadian Entitlement Record of Decision (ROD) on November 8, 1996. The ROD was based on the Delivery of the Canadian Entitlement Environmental Impact Statement (DOE/EIS- 0197, issued in January 1996). The November 1996 ROD announced the United States Entity decision to fulfill its obligation under the Columbia River Treaty (Treaty) between Canada and the United States of America (United States) by delivering the full Canadian Entitlement (Entitlement) at existing transmission interconnections between the United

273

Final Report, DOE grant DE-FG02-99ER45780, "Indirect Excitons in Coupled Quantum Wells"  

SciTech Connect

The is the final technical report for this project, which was funded by the DOE from 1999 to 2012. The project focused on experimental studies of spatially indirect excitons in coupled quantum wells, with the aim of understanding the quantum physics of these particles, including such effects as pattern formation due to electron-hole charge separation, the Mott plasma-insulator transition, luminescence up-conversion through field-assisted tunneling, luminescence line shifts due to many-body renormalization and magnetic field effects on tunneling, and proposed effects such as Bose-Einstein condensation of indirect excitons and phase separation of bright and dark indirect excitons. Significant results are summarized here and the relation to other work is discussed.

Snoke, david W. [University of Pittsburgh

2014-07-21T23:59:59.000Z

274

DOE F 4600.2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL FEDERAL ASSISTANCE REPORTING CHECKLIST U.S. Department of Energy For instructions see FAL Management of Report Deliverables DOE F 4600.2 (10/01) All Other Editions are Obsolete 1. Identification Number: 2. Program/Project Title: 3. Recipient: 4. Reporting Requirements: Frequency No. of Copies Addressees MANAGEMENT REPORTING Progress Report Special Status Report (see Special Instructions) SCIENTIFIC/TECHNICAL REPORTING (Reports/Products must be submitted with appropriate DOE F 241. The 241 forms are available at .) www.osti.gov/elink Report/Product Form Final Scientific/Technical Report Conference papers/proceedings* Software/Manual Other (see special instructions) * Scientific and technical conferences only DOE F 241.3 DOE F 241.3 DOE F 241.4 DOE F 241.3 FINANCIAL REPORTING CLOSEOUT REPORTING OTHER REPORTING SF-269, Financial Status Report SF- 269A, Financial

275

FINAL ENVIRONMENTAL ASSESSMENT FOR REMOVAL ACTIONS AT THE TECHNICAL AREA III CLASSIFIED WASTE LANDFILL, SANDIA NATIONAL LABORATORIES, NEW MEXICO - DOE/EA-1729  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL ENVIRONMENTAL ASSESSMENT FOR REMOVAL FINAL ENVIRONMENTAL ASSESSMENT FOR REMOVAL ACTIONS AT THE TECHNICAL AREA III CLASSIFIED WASTE LANDFILL, SANDIA NATIONAL LABORATORIES, NEW MEXICO DOE/EA-1729 August 2010 National Nuclear Security Administration Sandia Site Office P.O. Box 5400 Albuquerque, New Mexico 87185-5400 DOE/EA-1729: Environmental Assessment for Removal Actions at the Technical Area III August 2010 Classified Waste Landfill, Sandia National Laboratories, New Mexico i TABLE OF CONTENTS Section 1.0 PURPOSE AND NEED FOR AGENCY ACTION .................................................................... Page 1 1.1 Background .................................................................................................................................. 1

276

DOE Manual - Advisory Committee Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANUAL MANUAL DOE M 515.1-1 Approved: 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM U.S. DEPARTMENT OF ENERGY Office of Management AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Management i DOE M 515.1-1 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM 1. PURPOSE. This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum requirements for Federal agencies to manage and administer advisory committees. The Manual provides detailed Department of Energy (DOE or Department)

277

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology (ACT) SHARE Agreement For Commercializing Technology (ACT) science Technology transfer has always been a vital part of the mission of the DOE labs. Now DOE, Oak Ridge...

278

August 20, 2014 meeting with DOE representatives regarding the remand of the DOE Direct Final Rule as it relates to efficiency standards for non-weatherized gas furnaces  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum provides an overview of the meeting between representatives of the American Public Gas Association (APGA) and of the Department of Energy (DOE). Present for APGA were Dave Schryver...

279

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Time: 2014-11-18 08:00:00 6456Proposal: NS-2014-6456-A PI: Paris Wiley Institution: Honeywell Corporation Title: Neutron Single Event Effects T... Start Time: 2014-11-19 08:00:00...

280

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

talks: 18 Presentation number Start time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim...

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

ImageRotator.items href: 'javascript:void(0)', alt: 'Mule deer near cocooned reactor', title: 'Mule deer near cocooned reactor', image: src: 'http:www.hanford.govc.cfm...

282

--No Title--  

National Nuclear Security Administration (NNSA)

in Table 2.0. According to Title 40 CFR 61.93.(b)(4), (CFR 2002) no credit was taken for pollution control equipment in determining air emissions. The emissions for NESHAPs...

283

Final Supplemental Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Foreword COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada

284

EIS-0203F; DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1995.html[6/27/2011 12:08:32 PM] Summary-1995.html[6/27/2011 12:08:32 PM] SUMMARY DOE/EIS-0203-F Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement Summary April 1995 U.S. Department of Energy Office of Environmental Management Idaho Operations Office Department of Energy Washington, DC 20585 April 1995 Dear Citizen: This is a summary of the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement. The Department of Energy and

285

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

2010 Loretta.averna@lex.doe.gov www.PPPO.energy.gov Paducah DOE workers reach out to help family of former colleague Paducah, Ky: The positive impacts from the American Recovery...

286

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNL's Smith, DOE's Brown winners of Muddy Boot Award On the left, DOE Oak Ridge Office Deputy Manager Robert Brown (left) and ORNL Deputy Director for Operations Jeff Smith...

287

DOE/EIS-0293 Final Environmental Impact Statement for the Conveyance and Transfer of Certain Land Tracts Administered by the U.S. Department of Energy and Located at Los Alamos National Laboratory, Los Alamos and Santa Fe Counties, New Mexico (Oct. 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A-1 A-1 Final CT EIS APPENDIX A PUBLIC LAW 105-119 This appendix contains the text of Public Law 105-119, which was passed by Congress on November 26, 1997. Public Law 105-119, the "Departments of Commerce, Justice, and State, the Judiciary, and Related Agencies Appropriations Act," 1998 (section 632, 42 United States Code [U.S.C.] §§2391; "the Act"), directs the DOE to convey or transfer parcels of DOE land in the vicinity of LANL to the Incorporated County of Los Alamos, New Mexico, and the Secretary of the Interior, in trust for the Pueblo of San Ildefonso. The Act sets forth the criteria, processes and dates by which the tracts will be selected, titles to the tracts reviewed, environmental issues evaluated, and decisions made as to the allocation of the tracts between the

288

Active DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Active DOE Technical Standards Active DOE Technical Standards Document Number Document Title Responsible SLM DOE-HDBK-1001-96 DOE-HDBK-1002-96 DOE-HDBK-1003-96 DOE-HDBK-1010-92 DOE-HDBK-1011/1-92 DOE-HDBK-1011/2-92 DOE-HDBK-1011/3-92 DOE-HDBK-1011/4-92 DOE-HDBK-1012/1-92 DOE-HDBK-1012/2-92 DOE-HDBK-1012/3-92 DOE-HDBK-1013/1-92 DOE-HDBK-1013/2-92 DOE-HDBK-1014/1-92 DOE-HDBK-1014/2-92 DOE-HDBK-1015/1-93

289

Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings" (DOE/EA-1918)  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment for Final Rule, 10 CFR 433, "Energy Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings" (DOE/EA-1918) June 28, 2013 1 Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings" (DOE/EA-1918) SUMMARY The U.S. Department of Energy (DOE) has prepared this environmental assessment (EA) for DOE's Final Rule, 10 CFR Part 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings". The Final Rule updates the baseline standard in 10 CFR 433 to the latest private sector standard based on cost-effectiveness and DOE's determination that energy efficiency has

290

Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings" (DOE/EA-1918)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Final Rule, 10 CFR 433, "Energy Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings" (DOE/EA-1918) June 28, 2013 1 Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings" (DOE/EA-1918) SUMMARY The U.S. Department of Energy (DOE) has prepared this environmental assessment (EA) for DOE's Final Rule, 10 CFR Part 433, "Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings". The Final Rule updates the baseline standard in 10 CFR 433 to the latest private sector standard based on cost-effectiveness and DOE's determination that energy efficiency has

291

DOE/EA-1648: Final Environmental Assessment for the White Earth Nation Wind Energy Project Becker County, Minnesota, White Earth Indian Reservation, USA (April 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the for the White Earth Nation Wind Energy Project Becker County, Minnesota, White Earth Indian Reservation, U.S.A. April 2009 U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 DOE/EA # 1648 White Earth Nation Wind Energy Project Final Environmental Assessment White Earth Nation Reservation, Minnesota, U.S.A. DOE/EA # 1648 U.S. Department of Energy For further information concerning this document, the following person(s) may be contacted: Mike Triplett Planner White Earth Nation 35500 Eagle View Road P.O. Box 418 White Earth, MN 56591 218-983-4640 ext 5906 Steve Blazek NEPA Compliance Officer Department of Energy 1617 Cole Boulevard Golden, Colorado 80401 Steve.blazek@go.doe.gov.

292

Microsoft Word - DOE_RM_DM-#359195-v1-4_5_Acre_final_Jun-Nov_2006.DOC  

Office of Legacy Management (LM)

through November 2006 through November 2006 December 2006 Office of Legacy Management DOE M/1398 2006 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy DOE-LM/1398-2006 Pinellas Environmental Restoration Project Semiannual Progress Report 4.5 Acre Site June through November 2006 December 2006 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado U.S. Department of Energy 4.5 Acre Site Semiannual Progress Report for June through November 2006

293

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

1992-03-01T23:59:59.000Z

294

News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 UMTRCA Title I and Title II Disposal Sites 2010 UMTRCA Title I and Title II Disposal Sites Reports Available News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports Available February 23, 2011 - 9:51am Addthis News Contact: DOE, Rich Bush, UMTRCA Program Lead (970) 248-6073 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 Grand Junction, Colo. - The U.S. Department of Energy announces the availability of the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites and the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites reports. In 2010, DOE's Office of Legacy Management was responsible for providing long-term surveillance and maintenance services at 25 uranium mill tailings

295

G Subject: Implementation of Division B, Title III, Title V and Division C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B, Title III, Title V and Division C B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No. 112-74 References: Consolidated Appropriations Act, 2012, Title III, Section 301(a), 301(b), 316 Pub. L. No. 112-74 Title V, Sections 501, 504, 505 Title VII, Sections 725 When is this Financial Assistance Letter (FAL) effective? The statutory provisions addressed in this FAL were effective on the enactment date of the Consolidated Appropriations Act, 2012, December 23, 2011. When does this FAL expire? This FAL remains in effect until superseded or canceled. Who is the intended audience? Department of Energy (DOE) and National Nuclear Security Administration (NNSA) Contracting Officers. Who is the point of contact?

296

--No Title--  

Office of Environmental Management (EM)

regarding the site transition process of remediated areas from the responsibility of DOE Environmental Management to landlords at ongoing mission sites. The recommendation...

297

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and control rights usually and customarily provided to lenders in similar project finance transactions" allows DOE, within its sole discretion and in appropriate circumstances as...

298

Sundance Energy Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS - 0322 DOE/EIS - 0322 Sundance Energy Project Final Environmental Impact Statement Western Area Power Administration June 2001 DOE/EIS - 0322 COVER SHEET Title: Sundance Energy Project, Pinal County, AZ, Final Environmental Impact Statement Lead Agency:U.S. Department of Energy, Western Area Power Administration For information about the Sundance Energy For general information on the DOE EIS Project contact: process, contact: Mr. John Holt, Environmental Manager Ms. Carol Borgstrom, Director Western Area Power Administration NEPA Policy and Assistance, EH-42 Desert Southwest Region U.S. Department of Energy P.O. Box 6457 1000 Independence Avenue, SW Phoenix, AZ 85005-6457 Washington, DC 20585 (602) 352-2592 (202) 586-4600 or (800) 472-2756 Fax: (602) 352-2630 E-mail: holt@wapa.gov

299

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

300

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Microsoft Word - Comments to DOE from MoPSC on 2009 Trans Congestion Study_FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF THE MISSOURI PUBLIC SERVICE MISSOURI COMMISSION COMMENTS OF THE MISSOURI PUBLIC SERVICE MISSOURI COMMISSION REGARDING THE DEPARTMENT OF ENERGY'S 2009 TRANSMISSION CONGESTION STUDY AND THE DESIGNATION OF NATIONAL INTEREST ELECTRICITY TRANSMISSION CORRIDORS I. Introduction A. Major Concern of the Missouri Public Service Missouri Commission At the outset, the Missouri Public Service Commission (Missouri Commission) wants to thank the Department of Energy (DOE) for the opportunity to provide input on its process for establishing National Interest Electricity Transmission Corridors (NIETCs). While cost allocation is not within the purview of the DOE under the 2005 Energy Policy Act, it is important for DOE to understand that the Missouri Commission's major concern is being allocated cost without commensurate benefits for the citizens of Missouri. The Missouri

302

Report Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TCEP Draft EIS Summary TCEP Draft EIS Summary S-i CONTENTS 1 PURPOSE AND NEED.......................................................................................................................................S-1 1.1 Introduction ..............................................................................................................................................S-1 1.2 DOE's Purpose and Need ......................................................................................................................S-3 1.3 Industrial Participant's (Summit's) Purpose and Need ............................................................S-3 1.4 DOE Scoping Process ..............................................................................................................................S-3

303

Supplement Analysis for the Watershed Management Program EIS and the Hood River Fisheries Project Final EIS(DOE/EIS-0241) (DOE/EIS-0265/SA-62) (9/14/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-62) and the Hood River Fisheries Project Final EIS (DOE/EIS-0241). Thomas Morse Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat Project Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.16 and 1.17 Spawning and rearing habitat enhancements; 2.1 Maintain healthy riparian plant communities; 4.9 Water conveyance: ditch and canal lining; 4.23 Intake and return diversion screens; 1.13 Culvert removal and replacement. Location: Odell, Hood River County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Warms

304

DOE/EA-1440-S-1: Finding of No Significant Impact for Final Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's South Table Mountain Complex (5/15/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Cole Boulevard 7 Cole Boulevard Golden, Colorado 80401 -3305 May 14,2008 FINDING OF NO SIGNIFICANT IMPACT for SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL ASSESSMENT OF THE NATIONAL RENEWABLE ENERGY LABORATORY'S SOUTH TABLE MOUNTAIN COMPLEX AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: 111 accordance with the Department of Energy (DOE) National Environmental Policy Act (NEPA) implementing regulations, DOE evaluated the potential environniental impacts that would result from three actions at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site: Proposed Construction and Operation o f Research Suppol-t Facilities (RSF), Infrastructure Improvements (Phase I), Upgrades to tlie Thermochemical User Facility (TCUF) and addition of the

305

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge, TN 37831 * Phone 865-241-4583, 865-241-4584; 1-800-382-6938 * Fax 865-574-3521 www.oakridge.doe.govemssab Many Voices Working for the Community Oak Ridge Site Specific...

306

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 24, 2008 Mr. Steve McCracken Assistant Manager for Environmental Management DOE-Oak Ridge Operations P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. McCracken:...

307

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2010 Mr. John Eschenberg Assistant Manager for Environmental Management DOE-Oak Ridge Operations P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Eschenberg:...

308

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Many Voices Working for the Community Oak Ridge Site Specific Advisory Board June 9, 2011 John Eschenberg Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O....

309

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2010 John Eschenberg Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Eschenberg: Recommendation...

310

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Site Specific Advisory Board Wednesday, May 14, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D....

311

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2001, EM-91, Oak Ridge, TN 37831 * Phone 865-241-4583, 865-241-4584; 1-800-382-6938 * Fax 865-574-3521 Web: http:www.oakridge.doe.govemssab Many Voices Working for the...

312

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

P.O. Box 2001, EM-91, Oak Ridge, TN 37831 * Phone 865-241-4583; 865-241-4584 * Fax 865-574-3521 Web: http:www.oakridge.doe.govemssab Many Voices Working for the Community Oak...

313

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

GeoffTyree@rl.gov Backgrounder on Recovery Act Jobs Created at Hanford The Department of Energy (DOE) and its contractors are tracking jobs created by Recovery Act funding at the...

314

--No Title--  

Office of Environmental Management (EM)

(DOE) Order 350.1 and Special H Clause SUMMARY: The purpose of Acquisition Letter (AL) 2013-09 is to communicate the revisions to Chapters IV, Compensation; Chapter V,...

315

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

engineering that evolved from their work on a DOE project that focused on developing mobile robots to work in hazardous environments. The invention won an R&D 100 Award in...

316

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Director and UT-Battelle CEO Thom Mason, the DOE's Oak Ridge Operations Manager Gerald Boyd said, "You and your staff are to be congratulated for achieving a high level of...

317

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Geoff Tyree, DOE (509) 376-4171, GeoffTyree@rl.gov Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site RICHLAND, WASH. -Workers are tackling a...

318

Current titles  

SciTech Connect

116 abstracts are presented of work done with the electron microscope. NCEM is a DOE-designated national user facility and is available at no charge to qualified researchers (assess is controlled by a steering committee).

Not Available

1993-04-01T23:59:59.000Z

319

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

320

DOE/EA-1676: Final Environmental Assessment for Department of Energy Loan Guarantee for U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon (December 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76 76 FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment for DEPARTMENT OF ENERGY LOAN GUARANTEE FOR U.S. GEOTHERMAL'S NEAL HOT SPRINGS GEOTHERMAL FACILITY IN VALE, OREGON U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 December 2009 DOE/EA-1676 Environmental Assessment for Department of Energy Loan Guarantee for U.S Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon DOE/EA-1676 TABLE OF CONTENTS LIST OF ACRONYMS iii Executive Summary 1 1.0 PURPOSE AND NEED FOR AGENCY ACTION 2 2.0 PROPOSED ACTION AND ALTERNATIVES 2 2.1 Description of Proposed Action 4 2.2 Alternatives Considered but Eliminated 9 2.3 No Action Alternative 9 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL EFFECTS 10

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Record of Decision for the White Wind Farm Final Environmental Impact Statement (DOE/EIS-0376) (07/10/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25 Federal Register 25 Federal Register / Vol. 72, No. 131 / Tuesday, July 10, 2007 / Notices Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free (866) 208-3372 (voice) or 202-502-8659 (TTY), or send a fax to 202-208-2106 with the required accommodations. All interested parties and staff are permitted to attend. For further information please contact Katie Williams at (202) 502-8246 or e-mail kathleen.williams@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E7-13307 Filed 7-9-07; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration White Wind Farm Project (DOE/ EIS- 0376) AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: White Wind Farm, LLC

322

Final Report to the U.S. DOE Grant DE-FG03-93-ER14326  

SciTech Connect

This document presents an overview of the results of the DOE's support of experimental research into the structure and interactions of the negative ion of hydrogen conducted by the Department of Physics and Astronomy of the University of New Mexico at the Los Alamos National Laboratory. The work involves many collaborations with scientists from both institutions, as well as others. Although official DOE support for this work began in 1977, the experiment that led to it was done in 1971, near the time the 800 MeV linear accelerator at Los Alamos (LAMPF) first came on line. Until the mid nineties, the work was performed using the relativistic beam at LAMPF. The most recent results were obtained using the 35 keV injector beam for the Ground Test Accelerator at Los Alamos. A list of all published results from this work is presented.

Bryant, Howard C.

1999-06-30T23:59:59.000Z

323

DOE/EA-1584: Final Environmental Assessment for Sand Point Wind Installation Project, Sand Point, Alaska (September 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sand Point Wind Installation Project Sand Point, Alaska DOE/EA -1584 U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 September 2009 TABLE OF CONTENTS Page 1.0 INTRODUCTION .............................................................................................................. 1 1.1 NATIONAL ENVIRONMENTAL POLICY ACT AND RELATED PROCEDURES....................................................................................................... 1 1.2 BACKGROUND .................................................................................................... 1 1.3 PURPOSE AND NEED.......................................................................................... 2 1.4 PUBLIC SCOPING AND CONSULTATION.......................................................

324

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

NLE Websites -- All DOE Office Websites (Extended Search)

TECHNOLOGY DESCRIPTIONS TECHNOLOGY DESCRIPTIONS DOE/EIS-0279 March 2000 Technology Descriptions A-iii TABLE OF CONTENTS Section Page A.1 New Packaging Technologies .......................................................................................... A-1 A.1.1 Direct Disposal................................................................................................... A-1 A.1.2 Direct Co-Disposal............................................................................................. A-2 A.2 New Processing Technologies.......................................................................................... A-2 A.2.1 Melt and Dilute .................................................................................................. A-2 A.2.2 Press and Dilute .................................................................................................

325

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNOLOGY DESCRIPTIONS TECHNOLOGY DESCRIPTIONS DOE/EIS-0279 March 2000 Technology Descriptions A-iii TABLE OF CONTENTS Section Page A.1 New Packaging Technologies .......................................................................................... A-1 A.1.1 Direct Disposal................................................................................................... A-1 A.1.2 Direct Co-Disposal............................................................................................. A-2 A.2 New Processing Technologies.......................................................................................... A-2 A.2.1 Melt and Dilute .................................................................................................. A-2 A.2.2 Press and Dilute .................................................................................................

326

W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NRG W.A. PARISH PCCS PROJECT NRG W.A. PARISH PCCS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT APPENDIX H. BEG MODELING REPORT APPENDIX H BEG MODELING REPORT DOE/EIS-0473 NRG W.A. PARISH PCCS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT APPENDIX H. BEG MODELING REPORT INTENTIONALLY LEFT BLANK 1 Reservoir modeling and simulation for estimating migration extents of injectate-CO 2 in support of West Ranch oilfield NEPA/EIS Gulf Coast Carbon Center, Bureau of Economic Geology, Jackson School of Geosciences, The University of Texas at Austin May 4, 2012 Summary It is anticipated that anthropogenic carbon dioxide (CO2-A) will be injected into the deep (5,000-6,000 ft below sea level) subsurface for enhanced oil recovery (EOR) at the West Ranch oilfield beginning in early 2015. The purpose of this report is to present reservoir modeling and simulation

327

Title II Disposal Sites Annual Report  

Energy.gov (U.S. Department of Energy (DOE))

This report presents the results of long-term surveillance and maintenance activities conducted by the DOE Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements.

328

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

329

SciTech Connect: Final Report  

Office of Scientific and Technical Information (OSTI)

Search Title: Final Report Final Report We propose to extend the technique of polarized neutron scattering into new domains by continued development and application of polarized...

330

DOE/EIS-0476 Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Environmental Impact Statement for the Proposed Vogtle Electric Generating Plant, Units 3 and 4 Burke County, Georgia Final Environmental Impact Statement U.S. Nuclear Regulatory Commission NUREG-1872 and NUREG-1947, Adopted as DOE/EIS-0476 U.S. Department of Energy February 2012 Lead Federal Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed Vogtle Electric Generating Plant, Units 3 and 4, Burke County, Georgia (Adopted) DOE/EIS-0476 Contact: For additional copies or more information on this Final Environmental Impact Statement (EIS), please contact: Mr. Matthew McMillen U.S. Department of Energy Loan Programs Office (LP-10) 1000 Independence Avenue, SW Washington, DC 20585 Phone: 202-586-7248

331

RECIPIENT:NREL PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013 Page 1 of2 **...*... @-~ .. @ '"',. .. ~ STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number NREL-11-013 GOO Based on my review ufthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: DOE/EA· Final Supplement-II to Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's 1440·5·11 (NREL) South Table Mountain Complex (November 2009) DOE/EA· Final Site-Site Wide Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South

332

DOE/EIS-0289, Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project (June 1, 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33(1',;$ 33(1',;$ &2168/7$7,21/(77(5681'(56(&7,21 2)7+((1'$1*(5('63(&,(6$&7 )LQDO -XQH  $ -($ (,6 $ APPENDIX B CONSULTATION LETTERS UNDER SECTION 106 OF THE NATIONAL HISTORIC PRESERVATION ACT Final: June 2000 B-3 JEA EIS B-4 Final: June 2000 B-5 JEA EIS B-6 $33(1',;& &2168/7$7,21/(77(56$662&,$7(':,7+7+( )/25,'$67$7(&/($5,1*+286( )LQDO -XQH  & -($ (,6 & )LQDO -XQH  & -($ (,6 & )LQDO -XQH  & -($ (,6 & )LQDO -XQH  & -($ (,6 & )LQDO -XQH 

333

No Title  

Science Journals Connector (OSTI)

... ARC, small, cost-efficient autono-mous submarines for ocean-floor sur-veys and monitoring offshore drilling equipment, ISE has had to turn to unlikely markets. Two ISE submarines are ... ISE's busi-ness. McFarlane says his autonomous vehicles can do complex tasks on drilling rigs, often replacing human divers. The technology exists, but the corporate mindset does not. ...

1988-06-23T23:59:59.000Z

334

--No Title--  

Buildings Energy Data Book (EERE)

| Total Delivered Natural Gas 33.5% 14.9% | USPS 9.8% | Energy Consumption 0.39 Fuel Oil 7.3% 3.3% | DOE 8.2% | Total Primary Coal 5.2% 2.3% | VA 6.4% | Energy Consumption ...

335

Microsoft Word - NEPA Big Sky Final EA .doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

886 886 FINAL ENVIRONMENTAL ASSESSMENT For The Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY April 2013 U.S. Department of Energy Kevin Dome Carbon Storage Project National Energy Technology Laboratory Final Environmental Assessment i April 2013 COVER SHEET Responsible Agency: The U.S. Department of Energy (DOE) Title: Environmental Assessment for the Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project (DOE/EA-1886) Contact: For additional copies or more information about this Environmental Assessment, please contact: Mr. Bill Gwilliam U.S. Department of Energy

336

Microsoft Word - Final EA for HARC Battleground.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL ENVIRONMENTAL ASSESSMENT BATTLEGROUND ENERGY RECOVERY PROJECT HARRIS COUNTY, TEXAS U.S. DEPARTMENT OF ENERGY National Energy Technology Laboratory OCTOBER 2011 THIS PAGE INTENTIONALLY LEFT BLANK COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Assessment for the Battleground Energy Recovery Project (DOE/EA-1769) Location: Deer Park, Harris County, Texas Contact: William J. Gwilliam, Document Manager National Energy Technology Laboratory U.S. Department of Energy P.O. Box 880 3610 Collins Ferry Road Morgantown, WV 26505 Email: william.gwilliam@netl.doe.gov Fax: 304-285-4403

337

Final Report on DOE Project entitled Dynamic Optimized Advanced Scheduling of Bandwidth Demands for Large-Scale Science Applications  

SciTech Connect

In this project, developed scheduling frameworks for dynamic bandwidth demands for large-scale science applications. In particular, we developed scheduling algorithms for dynamic bandwidth demands in this project. Apart from theoretical approaches such as Integer Linear Programming, Tabu Search and Genetic Algorithm heuristics, we have utilized practical data from ESnet OSCARS project (from our DOE lab partners) to conduct realistic simulations of our approaches. We have disseminated our work through conference paper presentations and journal papers and a book chapter. In this project we addressed the problem of scheduling of lightpaths over optical wavelength division multiplexed (WDM) networks. We published several conference papers and journal papers on this topic. We also addressed the problems of joint allocation of computing, storage and networking resources in Grid/Cloud networks and proposed energy-efficient mechanisms for operatin optical WDM networks.

Ramamurthy, Byravamurthy [University of Nebraska-Lincoln

2014-05-05T23:59:59.000Z

338

DOE/EA-1499; Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nevada Test Site Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

499 499 Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nevada Test Site Final Environmental Assessment August 2004 U. S. Department of Energy National Nuclear Security Administration Nevada Site Office Las Vegas, Nevada Available for sale to the Public, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis..gov Online Ordering: http://www.ntis.gov/ordering.htm Available electronically at: http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors in paper from-- U.S. Department of Energy Office of Scientific and Technical Information

339

Microsoft Word - Haxtun FINAL EA.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL FINAL ENVIRONMENTAL ASSESSMENT FOR HAXTUN WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Region JANUARY 2012 DOE/EA-1812 FINAL ENVIRONMENTAL ASSESSMENT FOR HAXTUN WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Region JANUARY 2012 DOE/EA-1812 iii January 2012 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Environmental Assessment for Haxtun Wind Energy Project, Logan and Phillips Counties,

340

Cape Wind Energy Project - Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Impact Statement for the Proposed Cape Wind Energy Project Nantucket Sound, Offshore of Massachusetts Final Environmental Impact Statement U.S. Department of the Interior, MMS EIS-EA, OCS Publication No. 2008-040, OCS EIS/EA MMS 2010-11 and OCS EIS/EA BOEMRE 2011-024 Adopted as DOE/EIS-0470 U.S. Department of Energy December 2012 Page 1 of 3 Lead Federal Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed Cape Wind Energy Project, Nantucket Sound, Massachusetts (Adopted), DOE/EIS-0470 Contact: For additional copies or more information on this Final Environmental Impact Statement (EIS), please contact: Mr. Todd Stribley U.S. Department of Energy Loan Programs Office, LP-10

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Presentation Title  

NLE Websites -- All DOE Office Websites (Extended Search)

genome-enabled sustainable genome-enabled sustainable lignocellulosic biofuels technologies Timothy Donohue Director, Great Lakes Bioenergy Professor of Bacteriology University of Wisconsin-Madison PNNL Frontiers in Biological Sciences November 10, 2009 www.glbrc.org Great Lakes Bioenergy Research Center 1 of 3 Bioenergy Research Centers (BRC) established in Fall, 2007 (anticipate ~142M in support by 2012) Academic UW-Madison (lead) Michigan State University Illinois State University Iowa State University DOE National Labs Pacific Northwest NL Oak Ridge NL Industry Lucigen/C5-6 Technologies DOE Office of Science Joint Genome Institute BACTER Institute ASCR Wisconsin & Michigan Facilities, Faculty & Staff Tech Transfer WARF, others 2 Integrates "hand-picked" scientists (">350") across sites & cultures

342

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

343

Systematic Process Synthesis and Design Methods for Cost Effective Waste Minimization. Final report  

SciTech Connect

This report focuses on research done over the past four years under the grant with the above title. In addition, the report also includes a brief summary of work done before 1994 under grant DOE-DE-FG02-85ER13396. Finally, a complete list of publications that acknowledge support from this grant is listed at the end.

Biegler, L.T.; Grossmann, I.E.; Westerberg, A.W.

1998-02-14T23:59:59.000Z

344

DOE/EIS-0378-SA-01: Supplement Analysis for the Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement (DOE/EIS-0378-SA-01) (02/05/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 5, 2008 February 5, 2008 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Port Angeles-Juan de Fuca Transmssion Project Final Environmental Impact Statement (DOE/EIS-0378/SA-01) Mark Korsness Project Manager - TEP TPP-3 Proposed Action: Relocation of the marine exit hole for the horizontal directionally drilled (HDD) hole that would be drilled under the Proposed Action. Proposed by: Sea Breeze Olympic Converter LP (Sea Breeze). Location: Port Angeles Harbor near Port Angeles, Washington. Background: As part of its proposed international transmission cable analyzed in the Port Angeles-Juan de Fuca Transmssion Project EIS, Sea Breeze has proposed the drilling of a HDD hole to transition the cable from the sea bed of the Strait of Juan de Fuca to land. The HDD hole

345

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

346

Approved DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

approved-doe-technical-standards Forrestal Building approved-doe-technical-standards Forrestal Building 1000 Independence Avenue, SW Washington, DC 205851.800.dial.DOE en DOE-STD-1150-2013 http://energy.gov/hss/downloads/doe-std-1150-2013 doe-std-1150-2013" class="title-link">DOE-STD-1150-2013

347

Record of Decision for the Fish and Wildlife Implementation Plan Final Environmental Impact Statement (DOE/EIS-0312) (10/31/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FISH AND WILDLIFE IMPLEMENTATION PLAN FISH AND WILDLIFE IMPLEMENTATION PLAN FINAL ENVIRONMENTAL IMPACT STATEMENT ADMINISTRATOR'S RECORD OF DECISION Summary The Bonneville Power Administration (BPA) has decided to adopt the Preferred Alternative (PA 2002) Policy Direction in its Fish and Wildlife Implementation Plan Environmental Impact Statement (FWIP EIS, DOE/EIS-0312, April 2003) as a comprehensive and consistent policy to guide the implementation and funding of the agency's fish and wildlife mitigation and recovery efforts. PA 2002 focuses on enhancing fish and wildlife habitat, modifying hydro operations and structures, and reforming hatcheries to both increase populations of listed fish stocks and provide long-term harvest opportunities. PA 2002 reflects regional fish and wildlife policy guidance and

348

DOE/EA-1631: Final Environmental Assessment for Department of Energy Loan Guarantee for Beacon Power Corporation Frequency Regulation Facility in Stephentown, NY (February 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 31 Environmental Assessment for DEPARTMENT OF ENERGY LOAN GUARANTEE FOR BEACON POWER CORPORATION FREQUENCY REGULATION FACILITY IN STEPHENTOWN, N.Y. U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 February 2009 FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment for Department of Energy Loan Guarantee for Beacon Power Corporation Frequency Regulation Facility in Stephentown, N.Y. DOE/EA-1631 TABLE OF CONTENTS LIST OF ACRONYMS iii 1.0 PURPOSE AND NEED 1 1.1 Introduction 1 1.2 Purpose and Need for Agency Action 1 2.0 DESCRIPTION OF PROPOSED ACTION AND NO ACTION ALTERNATIVE 3 2.1 Location 3 2.2 Proposed Action 3 2.2.1 Flywheel 3 2.2.2 Project Elements 4 2.2.3 Project Systems 5 2.2.4 Construction

349

Completed DOE Technical Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completed) Completed) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Review Date P1020-2002REV National Phenomena hazards Design and Evaluation Criteria for DOE Facilities DOE-STD-1020-2012 James O'Brien (HS-30) P1066-1999REV Fire Protection and Emergency Services Program and Design Criteria (revision to DOE-STD-1066-99) DOE-STD-1066-2012 James O'Brien (HS-30)

350

TITLE XVII Application Process  

Energy.gov (U.S. Department of Energy (DOE))

The Title XVII Innovative Clean Energy Projects (Title XVII) loan program is currently accepting applications in response to open technology-specific solicitations.

351

Final Closeout report for grant FG36-08GO18018, titled: Functional Multi-Layer Solution Processable Polymer Solar Cells  

SciTech Connect

The original objectives were: (1) Develop a method to deposit multiple conjugated polymer film layers and avoid the problem of dissolution from mutually solubility; (2) Use this deposition method to develop multi-layer polymer based solar cells with layers that are function specific; (3) characterize these layers and devices; (4) develop electrical and optical models that describe and predict the properties of the multi-layers; and (5) Ultimate efficiency goals are {approx}6.75% with J{sub sc} = 12 mA/cm{sup 2}, FF = 0.75, and V{sub oc} = 0.75. The question of whether photovoltaic (PV) cells will ever be able to replace fossil fuels as the main provider of electrical power is not just a question of device efficiency; it is a question of how much power can be provided for what price. It has been well documented that PV devices at 10% power efficiency can provide for all of the world's power needs without covering too much of the earth's surface. Assuming desert like cloud coverage, an area equivalent to the land area of Texas would have to be covered. However, it has also been shown that using the current state-of-the-art silicon devices, the price-per-Watt will never be low enough to be economically feasible for large-scale development. Solution-processable PV devices based on polymers are a very attractive alternative to traditional Silicon PV because this technology is much lower in materials cost and in environmentally toxic waste production. Solution-based polymers can be rapidly deposited using printing technologies and are compatible with light-weight flexible substrates that can increase the range of available PV applications. In the past ten years, the efficiency of polymer based PV devices has increased from {approx}1% to over 10%. The highest efficiency organic solar cells are based upon a single layer than consists of a mixture of donor and acceptor moieties. This one layer has multiple optical and electrical functions, so the design of a single heterojunction layer is based upon the idea of balancing good and bad properties within a single film. This proposal addresses the idea that the use of multiple layers that have differing electrical and optical functions could lead to greater efficiency because fewer materials compromises must be made. This idea is not new, multiple functional layer have been successfully used in cross-linked OLED's and organic small molecule evaporated PV devices. The main reason that multiple layers of polymers are not commonly deposited is that most conjugated polymers are mutually soluble in the same solvents. The work outlined in the proposal was intended to develop a new deposition strategy that would allow multiple organic layers to be deposited from solution using spin coating. The deposition method that we proposed was successful, sometimes, but ultimately not reliable. Instead we focused on more reliable methods to implement doping along the interface between layers. This work has been very successful. We found that using PEDOT:PSS, the PSS would form a surface layer of {approx}2-3 nm thickness that would mix with and electrochemically react with P3HT upon heating. This mechanism is also a crosslinking reaction in that H{sub 2} is released and permanent new bonds are formed. Using the Plextronics Inc. replacement to PEDOT:PSS, for which there are no mobile dopants, we were able to show that a second and different mechanism can be used to p-type dope organic materials. We are currently working with Plextronics to develop a new product. Finally we produced n-type doping of a thin fullerene layer near the cathode also using a self-assembly method. Low work function metals will diffuse into the BHJ layer and dope the fullerene upon heating. This doping also affects the vertical segregation of BHJ materials in a predictable way. We accomplished all of the scientific goals that we set out in the proposal written in May 2007. Some of the methods we proposed were not fully successful, but we did come up with better methods to achieve the same goal. We did not achieve the efficiency g

Adam J. Moule

2012-05-01T23:59:59.000Z

352

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 U.S. Department of Energy Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement November 2002 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project Final Environmental Impact Statement (EIS) (DOE/EIS-0318) Location: Clark County, Kentucky Contacts: For further information on this environmental For further information on the DOE National impact statement (EIS), call: Environmental Policy Act (NEPA) process, call: 1-800-432-8330 ext. 5460 1-800-472-2756 or contact: or contact: Mr. Roy Spears Ms. Carol Borgstrom

353

Microsoft Word - EnerDel Final EA for Concurrence_031710.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE'S PROPOSED FINANCIAL ASSISTANCE TO ENERDEL, INC. FOR ITS EXPANSION OF BATTERY MANUFACTURING CAPABILITIES AT INDIANAPOLIS, NOBLESVILLE AND GREENFIELD, INDIANA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1710 FINAL ENVIRONMENTAL ASSESSMENT DOE'S PROPOSED FINANCIAL ASSISTANCE TO ENERDEL, INC. FOR ITS EXPANSION OF BATTERY MANUFACTURING CAPABILITIES AT INDIANAPOLIS, NOBLESVILLE AND GREENFIELD, INDIANA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1710 DOE/EA-1710 iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Assessment: DOE's Proposed Financial Assistance to EnerDel, Inc. for Its Expansion of Battery Manufacturing Capabilities at Indianapolis, Noblesville and

354

Presentation Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Sustainable Energy Project - Hawaii Sustainable Energy Project - NREL Support DOE OE Smart Grid Peer Review Ben Kroposki, PhD, PE November 2-4, 2010 Innovation for Our Energy Future Innovation for Our Energy Future Hawaii Sustainable Energy Project- NREL Objective Funding Summary ($K) FY09 FY10 FY11 300K 300K 300K Technical Scope Provide technical support to Hawaii to reach goal of 70% renewable and energy efficiency Provide technical support to Lanai (MECO and C&C) to help reach goal of 100% renewable energy. Provide Kauai and KIUC with technical support regarding integration of renewable energy. Provide technical support for Hawaii in the areas of grid integration of distributed and renewable energy and smart grid applications Innovation for Our Energy Future Needs and Challenges This project addresses the Smart

355

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

356

Presentation Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Steve Willard PE Principal Investigator November 3, 2010 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory PNM/DOE SGDP Battery + PV Objectives * Project will co-locate a 2 - 4 MWh Advanced Lead Acid battery with a separately installed 500kW solar PV plant at a utility-owned site to create a firm, dispatchable distributed generation resource. * The project will develop broadly applicable modeling tools. These tools are being developed and used during the project to optimize the battery-system control algorithms, and ultimately will help characterize and further the understanding of feeders with storage and distributed

357

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

358

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

359

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

360

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

362

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

363

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

364

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

365

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

366

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

367

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

368

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

369

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

370

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

371

Title: DOE-RL Groundwater Sampling SIA  

NLE Websites -- All DOE Office Websites (Extended Search)

organization. An SIA is a process improvement activity utilizing Lockheed Martin's (LM) Lean Six Sigma methodology. The subject matter experts must have training and...

372

1. Final Title SECURITY of MOBILE COMMUNICATIONS  

E-Print Network (OSTI)

limitations; c) the user requirements; d) the contents of provided services; and e) the evolution of hacking of security attacks and hacking techniques; 3) discussing security policies and security practices to help for hacking systems via mobile communications. Threats and risk analysis are discussed in this part, along

373

Microsoft Word - Final EA with Hargis review comments 3.14.2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BOSTON ARCHITECTURAL COLLEGE'S (BAC) BOSTON ARCHITECTURAL COLLEGE'S (BAC) URBAN SUSTAINABILITY INITIATIVE FOR THE RENOVATION OF PUBLIC ALLEY #444, BOSTON, MASSACHUSETTS U.S. Department of Energy National Energy Technology Laboratory March 2012 DOE/EA-1885 FINAL ENVIRONMENTAL ASSESSMENT FOR THE BOSTON ARCHITECTURAL COLLEGE'S (BAC) URBAN SUSTAINABILITY INITIATIVE FOR THE RENOVATION OF PUBLIC ALLEY #444, BOSTON, MASSACHUSETTS U.S. Department of Energy National Energy Technology Laboratory MARCH 2012 DOE/EA-1885 DOE/EA-1885 iii March 2012 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for the Boston Architectural College's (BAC) Urban Sustainability Initiative for the Renovation of Public Alley #444, Boston, Massachusetts

374

10 CFR Part 1021 National Environmental Policy Act Implementing Procedures - Preamble to Final Rule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulations Regulations 15122 DEPARTMENT OF ENERGY 10 CFR Part 1021 National Environmental Policy Act Implementing Procedures AGENCY: Department of Energy. ACTION: Final rule. SUMMARY: The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). DOE is also revoking its existing NEPA guidelines. This rule incorporates changes required by certain policy initiatives instituted by the Secretary of Energy to facilitate participation of the public and affected states in the NEPA process for proposed DOE actions.

375

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SHEET SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2D; the Nevada Rail Corridor SEIS), and Draft Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369D; the Rail Alignment EIS) CONTACTS: For more information about this document, write or call: For general information on the DOE NEPA process, write or call: U.S. Department of Energy Office of Civilian Radioactive Waste Management

376

Final DOE Areas Feasibility Study  

Office of Legacy Management (LM)

the area California Office of Historic Preservation, Northwest Information Center, Lee Jordan, Coordinator June 26, 1998 and April 12, 2000 Historical and Cultural Resources...

377

NYSERDA-DOE Final Report  

SciTech Connect

The portion of the $40 million Better Buildings award directly administered by the New York State Energy Research and Development Authority (NYSERDA) is fully integrated with Green Jobs?Green New York (GJGNY). NYSERDA has committed most of the Better Buildings funding that it is administering to a Loan Loss Reserve (LLR) for a Revolving Loan Fund (RLF) that is capitalized by GJGNY. In addition, the City of New York, which has received a sub?award through NYSERDA in the amount of $21.4 million, received NYSERDA approval on their Strategy Memo outlining NYCs financing plan for implementation. Based upon NYSERDAs approval of the Strategy Memo, approximately $17.8 million in ARRA funds were released to fund NYCs Loan Loss Reserve and Revolving Loan Fund.

Ahearn, John; Gilbert, Erik

2014-10-06T23:59:59.000Z

378

DOE FINAL TECHNICAL REPORT RP  

SciTech Connect

The City of Georgetown Utility Systems (GUS) patnered with the private sector, the American Public Power Association (APPA) and Southwestern University to design, construct, test and monitor a solar co-generation system directly connected to the GUS electric distribution system. This report consists of the Primary Technical Report and 3 attachments.

RUSS PETERMAN

2012-01-01T23:59:59.000Z

379

Title I Disposal Sites Annual Report  

Energy.gov (U.S. Department of Energy (DOE))

This report presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements.

380

methane hydrate science plan-final.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 Principal Authors: Consor um for Ocean Leadership and the Methane Hydrate Project Science Team December 2013 DOE Award Number: DE-FE0010195 Project Title: Methane Hydrate...

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE P 420.1 Department of Energy Nuclear Policy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE P 420.1 Department of Energy Nuclear Policy DOE P 420.1 Department of Energy Nuclear Policy DOE P 420.1 Department of Energy Nuclear Policy PURPOSE: To document the Department of Energy's (DOE) nuclear safety policy. SCOPE: The provisions of this policy apply to all Departmental elements with responsibility for a nuclear facility, except the Naval Nuclear Propulsion Program, which is separately covered under Executive Order 12344, Title 50 United States Code, sections 2406 and 2511. This Policy cancels Secretary of Energy Notice 35-91, Nuclear Safety Policy, dated 9-9-91. DOE_P420-1_Final_2-8-11.pdf More Documents & Publications DOE P 420.1 Department of Energy Nuclear Safety Policy, Approved: 2-08-2011 Technical Basis for U. S. Department of Energy Nuclear Safety Policy, DOE Policy 420.1, 7/11

382

Microsoft Word - 110512_ACP DOE FEIS cover_attachment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

68 68 Environmental Impact Statement for the Proposed American Centrifuge Plant in Piketon, Ohio Pike County, Ohio Final Environmental Impact Statement U.S. Nuclear Regulatory Commission NUREG-1834, Adopted as DOE/EIS-0468 U.S. Department of Energy May 2011 Page Intentionally Left Blank Cover Sheet Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed American Centrifuge Plant in Piketon, Ohio (Adopted as DOE/EIS-0468) Contact: For additional copies or more information on this final environmental impact statement (EIS), please contact: Mr. Todd Stribley U.S. Department of Energy, Loan Guarantee Program (LP-10) 1000 Independence Avenue, SW Washington, DC 20585 Phone: 202-287-6526

383

Microsoft Word - Texas A&M Final EA 09-01-2010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 FINAL ENVIRONMENTAL ASSESSMENT FOR THE TEXAS A&M UNIVERSITY COMBINED HEAT AND POWER PROJECT, COLLEGE STATION, TEXAS U.S. Department of Energy National Energy Technology Laboratory September 2010 DOE/EA-1775 FINAL ENVIRONMENTAL ASSESSMENT FOR THE TEXAS A&M UNIVERSITY COMBINED HEAT AND POWER PROJECT, COLLEGE STATION, TEXAS U.S. Department of Energy National Energy Technology Laboratory September 2010 DOE/EA-1775 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for the Texas A&M Combined Heat and Power Project, College Station, Texas (DOE/EA-1775) Contact: For additional copies or more information about this environmental assessment (EA),

384

Western Greenbrier Co-Production Demonstration Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 OF 3 DOE / EIS-0361 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Agency: U.S. Department of Energy Title: Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS-0361) Location: Rainelle, West Virginia Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Roy Spears, Document Manager National Energy Technology Laboratory U.S. Department of Energy 3610 Collins Ferry Road

385

Microsoft Word - GM Maryland Revised Sup-Pre-final-EA 9-6-2011.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL SUPPLEMENTAL ENVIRONMENTAL FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT For General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland September 2011 U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY U.S. Department of Energy General Motors National Energy Technology Laboratory Supplemental Environmental Assessment i September 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application: White Marsh, Maryland (DOE/EA-1723S) Contact: For additional copies or more information about this environmental assessment (EA), please contact: Mrs. Pierina Fayish U.S. Department of Energy

386

Microsoft Word - Final EA Pope-Douglas Unit 3 5-7-10-1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 FINAL ENVIRONMENTAL ASSESSMENT POPE/DOUGLAS THIRD COMBUSTOR EXPANSION PROJECT ALEXANDRIA, MINNESOTA U.S. DEPARTMENT OF ENERGY National Energy Technology Laboratory MAY 2010 THIS PAGE INTENTIONALLY LEFT BLANK COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Assessment for the Pope/Douglas Third Combustor Expansion Project (DOE/EA-1699) Location: Alexandria, Minnesota Contact: Mark Lusk, Document Manager National Energy Technology Laboratory U.S. Department of Energy 3610 Collins Ferry Road P.O. Box 880, MS B07 Morgantown, WV 26507-0880 Email: mark.lusk@netl.doe.gov Fax: (304) 285-4403

387

Microsoft Word - Delphi Kokomo Final EA 12.5.11.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL ENVIRONMENTAL ASSESSMENT For Delphi Automotive Systems, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application December 2011 U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY U.S. Department of Energy Delphi Automotive Systems, LLC National Energy Technology Laboratory Final Environmental Assessment ______________________________________________________________________________ i December 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for Delphi Automotive Systems, LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application (DOE/EA-1851) Contact: For additional copies or more information about this environmental assessment

388

Non-Federal Participation In Ac Intertie Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Federal Participation In Ac Intertie Non-Federal Participation In Ac Intertie Final Environmental Impact Statement Volume 1: Environmental Analysis Bonneville DOE/eis-0145 POWER ADMINISTRATION January 1994 Non-Federal Participation in AC Intertie Final Environmental Impact Statement (DOE/EIS - 0145) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Non-Federal Participation in AC Intertie States and Other Areas Involved: Washington, Oregon, Idaho, Montana, California, Nevada, Utah, New Mexico, Arizona, Wyoming, British Columbia Abstract: BPA is considering action in two areas: (1) non-Federal access to

389

DOE F 1332.9  

NLE Websites -- All DOE Office Websites (Extended Search)

COST MANAGEMENT REPORT Page of DOE F 1332.9 FORM APPROVED (11-84) OMB NO. 1910-1400 1. TITLE 2. REPORTING PERIOD 3. IDENTIFICATION NUMBER 4. PARTICIPANT NAME AND ADDRESS 5. COST...

390

Research Highlights Sorted by Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J. A Bulk Parameterization of Giant Cloud Condensation Nuclei ARM Kogan, Y. A Climatology of Midlatitude Continental Cloud Properties and Their Impact on the Surface Radiation Budget ARM Dong, X. A Comparison of Integrated Water Vapor Sensors: WVIOP-96 ARM Liljegren, J. C. A Consistency Analysis of ARESE Aircraft Measurements ARM

391

Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Port Angeles-Juan de Fuca Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS-0378 October 2007 Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS - 0378 D e p a r t m e n t o f E n e r g y Office of Electricity Delivery and Energy Reliability and Bonneville Power Administration October 2007 Port Angeles-Juan de Fuca Transmission Project DOE/EIS-0378 Responsible Agency: U.S. Department of Energy (DOE): Office of Electricity Delivery and Energy Reliability (OE) and Bonneville Power Administration (BPA) Title of Proposed Project: Port Angeles-Juan de Fuca Transmission Project State Affected: Washington (WA) Abstract: Sea Breeze Olympic Converter LP (Sea Breeze) has applied to DOE for authorizations and approvals

392

Microsoft Word - 10.5.11 Markup by Hargis Final EA-RTI Syngas CCS Project.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

67 67 FINAL ENVIRONMENTAL ASSESSMENT for RTI INTERNATIONAL SCALE-UP OF HIGH- TEMPERATURE SYNGAS CLEANUP AND CARBON CAPTURE AND SEQUESTRATION TECHNOLOGIES, POLK COUNTY, FLORIDA U.S. DEPARTMENT OF ENERGY National Energy Technology Laboratory October 2011 RTI Syngas Cleanup/Carbon Capture Final and Sequestration Project Environmental Assessment DOE/EA-1867 N:\MYFILES\CORRESPONDENCE\LUSK, MARK\RTI-POLK EA\FONSI FINAL EA\10.5.11 MARKUP BY HARGIS FINAL EA-RTI SYNGAS CCS PROJECT.DOCX-101411 i October 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (DOE/EA-1867)

393

DOE/EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Project Office To Non-DOE Ownership (04/25/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 F I N A L Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy * Grand Junction Office * 2597 B ¾ Road * Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final DOE/EA-1338 FINAL Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy Grand Junction Office 2597 B ¾ Road Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final i April 2000 TABLE OF CONTENTS Title Page Table of Contents ......................................................................................................................................... i List of Figures ............................................................................................................................................iii

394

Microsoft Word - SHP_2011_final  

Office of Legacy Management (LM)

the requirements for UMTRCA Title I sites, is responsible for the custody and long-term care of the site. DOE Order 454.1 defines institutional controls as federal control of the...

395

Proposed Start Date: Title of Project  

E-Print Network (OSTI)

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

396

DOE/EA-1583: Final Site-wide Environmental Assessment and Finding of No Significant Impact for Rocky Mountain Oilfield Testing Center/Naval Petroleum Reserve No. 3 (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ROCKY MOUNTAIN OILFIELD TESTING CENTER / ROCKY MOUNTAIN OILFIELD TESTING CENTER / NAVAL PETROLEUM RESERVE NO. 3 FINAL Site-wide Environmental Assessment and Finding of No Significant Impact October 2008 U.S. Department of Energy Rocky Mountain Oilfield Testing Center 907 N. Poplar Street, Suite 150 Casper WY 82601 DOE/EA-1583 Rocky Mountain Oilfield Testing Center / Naval Petroleum Reserve No.3 Final Site-Wide Environmental Assessment i TABLE OF CONTENTS Section Page ABBREVIATIONS AND ACRONYMS.................................................................................................vii SUMMARY ................................................................................................................................................ix 1.0 INTRODUCTION .........................................................................................................................1

397

Microsoft Word - 2012.04.9_RFHP_FINAL_SEA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Renewable Fuel Heat Plant Improvements Supplemental Environmental Assessment Final Renewable Fuel Heat Plant Improvements Supplemental Environmental Assessment National Renewable Energy Laboratory South Table Mountain Site COVER SHEET Responsible Agency: Department of Energy Title: Final Supplemental Environmental Assessment of the Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, Jefferson County, Colorado (DOE/EA-1573-S-I). Proposed Action: Approval of making improvements to the Renewable Fuel Heat Plant (RFHP) consisting of development, construction, and operation of a woodchip fuel storage silo including material handling conveyances; and expansion of the sourcing of woody biomass fuels from Front Range sources to additional available regional sources.

398

DOE Publishes Final Rule for the Request for Exclusion of 100 Watt R20 Short Incandescent Reflector Lamps from Energy Conservation Standards  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has published a final rule regarding the request for exclusion of 100 Watt R20 short incandescent reflector lamps from energy conservation standards.

399

Final Site-Wide Environmental Impact Statement for the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico (05/2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 * Book 1 2 * Book 1 Appendices A through H Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0380 May 2008 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) Title: Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico (SWEIS) (DOE/EIS-0380) Location: Los Alamos, New Mexico For additional information or for copies of the SWEIS, contact: Elizabeth Withers, EIS Document Manager NNSA Service Center - Albuquerque

400

Flyer, Title VI  

Energy.gov (U.S. Department of Energy (DOE))

Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance.

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOE Data Explorer  

Office of Scientific and Technical Information (OSTI)

DDE DDE Discovering data and non-text information in the Department of Energy DOE Data Explorer What's New About DDE DOE Data Centers OSTI's Data ID Service Featured Collection Featured Data Collection Visit CEDR View the archive Search Find Advanced Search Options × Full Text: Bibliographic Data: Creator/Author: Title: Subject: Identifier Numbers: Host Website: Research Org: Sponsor/Funding Org: Contributing Orgs: Type: Select Type Publication Date: from Date: to to Date: Sort: By Relevance By Title Limit to: Matches with DOI only Collections only (no DOIs) Clear Find Advanced Search Basic Search Browse DDE Content All Titles (alphabetically) Sponsor/Funding Organizations Types of Data and Non-text Other Related Organizations Subject Categories Some links on this page may take you to non-federal websites. Their

402

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Title: Price Competitive Sale of Strategic Petroleum Reserve Petroleum, Standard Sales  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Price Competitive Sale of Strategic Petroleum Reserve Petroleum, Standard Sales Title: Price Competitive Sale of Strategic Petroleum Reserve Petroleum, Standard Sales Provisions, Revised Appendix A to Final Sales Rule Description: Publication in the Federal Register of Standard Sales Provisions containing or describing contract clauses, terms and conditions of sale, and performance and financial and responsibility measures which may be used for particular sales of Strategic Petroleum Reserve Petroleum Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in appendices A and B to this subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions).

403

COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1816 iii February 2011 DOE/EA-1816 iii February 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Assessment for the Town of Hempstead Wind-to-Hydrogen Project, Point Lookout, New York (DOE/EA-1816) CONTACT: For more information about this Environmental Assessment (EA), please contact: Melissa Rossiter NEPA Document Manager U.S. Department of Energy Office of Energy Efficiency and Renewability Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 Facsimile: (720) 356-1560 Email: melissa.rossiter@go.doe.gov ABSTRACT: The U.S. Department of Energy (DOE) has provided a grant to the Town of Hempstead, New York (the Town) under the Energy Efficiency and Conservation Block Grant (EECBG) Program, and Town Hempstead intends to use the funds to design, permit, and construct a 100-kilowatt wind

404

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

405

Microsoft Word - Final EA- ADM.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Final Environmental Assessment Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project "CO 2 Capture from Biofuels Production and Sequestration into the Mt. Simon Sandstone" Archer Daniels Midland Company Decatur, Illinois For U.S. Department of Energy National Energy Technology Laboratory DE-FE0001547 April 2011 ACKNOWLEDGEMENT This report was prepared with the support of the U.S. Department of Energy (DOE) under Award No. DE-FE0001547 (Recovery Act - Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project/National Energy Technology Laboratory/Office of Fossil Energy). INTENTIONALLY LEFT BLANK COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: CO 2 Capture from Biofuels Production and Sequestration into the Mt. Simon Sandstone

406

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

a Hydrogen a Hydrogen Cities Concept Applied to a Representative Community TIAX LLC Acorn Park Cambridge, Massachusetts 02140-2390 Reference: D0242 Final Report Prepared for DOE/NETL Prepared under CTC Subcontract 030400101 July 14, 2004 1 BZ/db/HydroCities/D0242/2-4/04 Agenda Purpose and Scope Description of Southpointe SOFC Technology Description Analytical Approach Waste-Heat-Utilization Possibilities Integration with Hydrogen Production Conclusions and Recommendations Appendices 2 BZ/db/HydroCities/D0242/2-4/04 Agenda Purpose and Scope Description of Southpointe SOFC Technology Description Analytical Approach Waste-Heat-Utilization Possibilities Integration with Hydrogen Production Conclusions and Recommendations Appendices 3 BZ/db/HydroCities/D0242/2-4/04 Purpose/Scope The objective of this assignment was to assess the potential benefits of

407

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

From Existing From Existing Coal-Fired Power Plants Jared Ciferno National Energy Technology Laboratory Final Results Revised: December 2007 Original Publication Date: December 2006 2 Disclaimer This presentation was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

408

Microsoft Word - PSRP May 15 2009 _WAPA Implementation Approp_ Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Approp) Final.docx Implementation Approp) Final.docx PSRP Name: WAPA Recovery Act Implementation Appropriation PSRP Lead Program Office and/or Laboratory/Site Office: Western Area Power Administration PSRP Lead Manager: Tim Meeks phone: (720) 962-7077 e-mail: tmeeks@wapa.gov address: P.O. Box 281213 Lakewood, CO 80228-8213 Does this program align with an existing PART program? No Does this program align with an existing CFDA program? No Program Title WAPA Recovery Act Implementation Appropriation 1. Objectives: Program Purpose Title IV, section 402, of the American Recovery and Reinvestment Act of 2009 (Recovery Act) provided Western with $10 million of non-reimbursable funding to implement borrowing

409

DOE/EA-1494; Final Environmental Assessment for Activities Using Biological Simulants and Releases of Chemicals at the Nevada Test Site (June 2004)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

494 FINAL ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES 494 FINAL ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES USING BIOLOGICAL SIMULANTS AND RELEASES OF CHEMICALS June 2004 v Table of Contents Section Page ACRONYMS AND ABBREVIATIONS.................................................................................................. viii GLOSSARY ................................................................................................................................. GL-1 EXECUTIVE SUMMARY .....................................................................................................................ES-1 CHAPTER 1.0 PURPOSE AND NEED FOR ACTION..................................................................... 1-1 1.1 Introduction.................................................................................................................

410

DOE/EA-1626: Final Environmental Assessment for Midwest Geological Sequestration Consortium (MGSC) Phase III Large-Scale Field Test (October 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26 26 FINAL ENVIRONMENTAL ASSESSMENT Midwest Geological Sequestration Consortium (MGSC) Phase III Large-Scale Field Test Decatur, Illinois October 2008 U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY U.S. Department of Energy MGSC Phase III National Energy Technology Laboratory Final Environmental Assessment ______________________________________________________________________________ Table of Contents i October 2008 TABLE OF CONTENTS LIST OF TABLES.......................................................................................................................... v LIST OF FIGURES ........................................................................................................................

411

Supplement to the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive at Yucca Mountain, Nye County, NV (DOE/EIS-0250F) (10/13/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90 Federal Register 90 Federal Register / Vol. 71, No. 198 / Friday, October 13, 2006 / Notices 1 Coincident with this Notice of Intent, DOE is publishing an Amended Notice of Intent to prepare a Supplemental Yucca Mountain Rail Corridor and Rail Alignment EIS (DOE/EIS-0250F-S2 and DOE/ EIS-0369). That EIS will review the rail corridor analyses of the Yucca Mountain Final EIS, and update, as appropriate, and will analyze the proposed Mina corridor; it also will include detailed analyses of alternative alignments for the construction and operation of a rail line within the Mina corridor, as well as the Caliente corridor. 2 Section 114(f)(4) of the NWPA provides that any environmental impact statement ''prepared in connection with a repository * * * shall, to the extent practicable, be adopted by the Commission

412

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 08 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada DOE/EIS-0369 Volume VI Nevada Rail Corridor SEIS and Rail Alignment EIS Comment-Response Documents U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -

413

EIS-0455: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to respond to Genesis Solar, LLC's application under Title V of FLPMA (43 U.S.C. 1761) for a ROW grant to construct, operate, maintain and decommission a solar thermal facility on public lands in compliance with FLPMA, BLM ROW regulations, and other applicable Federal laws. The BLM will decide whether to approve, approve with modification, or deny issuance of a ROW grant to Genesis Solar, LLC for the proposed GSEP. Bureau of Land Management Plan Amendment/Final Environmental Impact Statement for the Genesis Solar Energy Project Volume 1, DOE/EIS-0455 (August 2010) EIS-0455-FEIS-02-2010.pdf

414

Final Report for DOE Grant DE-FG02-06ER64160 Retrieval of Cloud Properties and Direct Testing of Cloud and Radiation Parameterizations using ARM Observations.  

SciTech Connect

This report briefly summaries the work performed at KNMI under DOE Grant DE-FG02-06ER64160 which, in turn was conducted in support of DOE Grant DE-FG02-90ER61071 lead by E. Clothieux of Penn. State U. The specific work at KNMI revolved around the development and application of the EarthCARE simulator to ground-based multi-sensor simulations.

Donovan, David Patrick [KNMI

2013-07-26T23:59:59.000Z

415

Microsoft Word - Air Products Final EA Word 2010-07-13.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 FINAL ENVIRONMENTAL ASSESSMENT FOR THE AIR PRODUCTS AND CHEMICALS, INC. WASTE ENERGY PROJECT AT THE AK STEEL CORPORATION MIDDLETOWN WORKS, MIDDLETOWN, OHIO U.S. Department of Energy National Energy Technology Laboratory July 2010 DOE/EA-1743 FINAL ENVIRONMENTAL ASSESSMENT FOR THE AIR PRODUCTS AND CHEMICALS, INC. WASTE ENERGY PROJECT AT THE AK STEEL CORPORATION MIDDLETOWN WORKS, MIDDLETOWN, OHIO U.S. Department of Energy National Energy Technology Laboratory July 2010 DOE/EA-1743 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for the Air Products and Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio Contact: For additional copies or more information about this environmental assessment (EA),

416

Paducah DUF6 Conversion Final EIS - Volume 2: Comment and Response Document, Part 1  

NLE Websites -- All DOE Office Websites (Extended Search)

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Paducah DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process,

417

DOE Acquisition and Project Management (APM) Glossary of Terms...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL...

418

DOE G 200  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

G 200.1-1A G 200.1-1A Department of Energy (DOE) Systems Engineering Methodology Version 3 The DOE Systems Development Lifecycle (SDLC) for Information Technology Investments September 2002 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer Date: September 2002 Page Rev Date: i TITLE PAGE Document Name: Department of Energy Systems Engineering Methodology (SEM) The DOE Systems Development Lifecycle (SDLC) for Information Technology Investments Publication Date: Original March 1996; Revised November 1997 Version 2 March 1999 Version 3 September 2002 Approval: ___________________________________ Karen Evans, Chief Information Officer ___________________________________ Brenda Coblentz, Program Manager, Software Quality & Systems Engineering

419

DOE/EIS-0236-S1F; National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (January 2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY SUMMARY 1 This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), Natural Resources Defense Council [NRDC] et al. v. Richardson et al. The Joint Stipulation and Order is reproduced at the end of this document as Attachment 1. In the Joint Stipulation and Order, the U.S. Department of Energy (DOE) agreed to prepare an SEIS to the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (SSM PEIS) (DOE/EIS-0236, DOE 1996a) to evaluate the reasonably foreseeable significant adverse environmental impacts of continuing to construct and of operating the National Ignition Facility (NIF) at Lawrence Livermore National

420

1. Identification Number: 2. Program/Project Title: 3. Recipient  

E-Print Network (OSTI)

period. O - Other; See instructions for further details. 5. Special Instructions: DOE F 4600.2 (03 with appropriate DOE F 241 forms available at https://www.osti.gov/elink/index.jsp ) Report/Product Form Final Scientific/Technical Report DOE F 241.3 Conference papers/proceedings DOE F 241.3 Software/Manual DOE F 241

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EA-1774-S1: Final Environmental Assessment and Finding of No Significant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-S1: Final Environmental Assessment and Finding of No 4-S1: Final Environmental Assessment and Finding of No Significant Impact EA-1774-S1: Final Environmental Assessment and Finding of No Significant Impact Energy Conservation Program: Energy Conservation Standards for Direct Heating Equipment (November 2011) For more information, contact: Mr. Mohammed Khan U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Building Technologies Program, EE-2J 1000 Independence Avenue, SW., Washington, DC 20585-0121 Telephone: 202-586-7892 Electronic mail: Mohammed.Khan@ee.doe.gov Based on an Environmental Assessment, DOE has determined that the adoption of amended energy conservation standards as required by The Energy Policy and Conservation Act, as amended) for direct heating equipment, as contained in the final rule titled, "Energy Conservation Program: Energy

422

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEST VALLEY DEMONSTRATION PROJECT WEST VALLEY DEMONSTRATION PROJECT WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FINAL SUMMARY December 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY DOE/EIS - 0337F For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE 10282 Rock Springs Road WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National

423

Final Environmental Impact Statement for the COB Energy Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PDX/041750002.DOC PDX/041750002.DOC Final Environmental Impact Statement for the COB Energy Facility DOE/EIS-0343 Bonneville Power Administration June 2004 PDX/041750002.DOC COB Energy Facility Project Final Environmental Impact Statement DOE/EIS-0343 Lead Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Interior, Bureau of Land Management (BLM) Title of Proposed Project: COB Energy Facility State Involved: Oregon Abstract: COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company (PERC), proposes to construct a 1,160-megawatt (MW) natural gas-fired, combined-cycle electric generating plant in Klamath County, Oregon, near the city of Bonanza. Electric power from the Energy Facility would enter the regional grid at BPA's Captain Jack Substation via a proposed 7.2-mile 500-kilovolt

424

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

425

Record of Decision for the Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement, Aiken, SC (DOE/EIS-0279)(8/7/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

224 224 Federal Register / Vol. 65, No. 152 / Monday, August 7, 2000 / Notices source for an Annual Report to Congress. Requests for copies of the proposed information collection request may be accessed from http://edicsweb.ed.gov, or should be addressed to Vivian Reese, Department of Education, 400 Maryland Avenue, SW, Room 4050, Regional Office Building 3, Washington, DC 20202-4651. Requests may also be electronically mailed to the internet address OCIO_IMG_Issues@ed.gov or faxed to 202-708-9346. Please specify the complete title of the information collection when making your request. Comments regarding burden and/or the collection activity requirements should be directed to Sheila Carey at (202) 708- 6287 or via her internet address Sheila_Carey@ed.gov. Individuals who

426

Global Environmental Course Title  

E-Print Network (OSTI)

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

427

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: 1: Environmental Analyses DOE/EIS-0312 April 2003 Fish and Wildlife Implementation Plan Final Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Fish and Wildlife Implementation Plan States and Provinces Involved: Arizona, California, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming, and British Columbia Abstract: Despite the efforts of BPA and other regional entities in the Pacific Northwest, some populations of fish and wildlife continue to decline. Reasons for the lack of success include the following: different groups have different values and priorities; there is no clear and agreed-upon scientific answer; and there are conflicting

428

Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Volume I Chapters 1 - 4 Chapters 1 - 4 DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information on the DOE write or call: National Environmental Policy Act (NEPA) process, write or call: Theodore A. Wyka Carol Borgstrom, Director Complex Transformation Office of NEPA Policy and Compliance, GC-20 SPEIS Document Manager U.S. Department of Energy Office of Transformation, NA-10.1 1000 Independence Avenue, SW

429

Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Summary Summary DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information on the DOE write or call: National Environmental Policy Act (NEPA) process, write or call: Theodore A. Wyka Carol Borgstrom, Director Complex Transformation Office of NEPA Policy and Compliance, GC-20 SPEIS Document Manager U.S. Department of Energy Office of Transformation, NA-10.1 1000 Independence Avenue, SW

430

Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume II Volume II Volume II Chapters 5 - 15 and Chapters 5 - 15 and Appendices A - G Appendices A - G DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information on the DOE write or call: National Environmental Policy Act (NEPA) process, write or call: Theodore A. Wyka Carol Borgstrom, Director Complex Transformation Office of NEPA Policy and Compliance, GC-20 SPEIS Document Manager U.S. Department of Energy

431

Agenda - DOE Tribal Leader Solar Energy Forum | Department of...  

Energy Savers (EERE)

Agenda - DOE Tribal Leader Solar Energy Forum Agenda - DOE Tribal Leader Solar Energy Forum Agenda - Solar Forum (Palm Springs) FINAL.pdf More Documents & Publications DOE Tribal...

432

DOE Retrospective Review Plan and Burden Reduction Report | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report DOE Retrospective Review Plan and Burden Reduction Report DOE Retrospective Review Plan and Burden Reduction Report July 2014 FINAL More Documents & Publications DOE...

433

DOE/EIS-0464D  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0464D O ce of Fossil Energy National Energy Technology Laboratory U.S. Department of Energy Lake Charles Carbon Capture and Sequestration Project Draft Environmental Impact Statement This page left blank intentionally. COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Title: Lake Charles Carbon Capture and Sequestration Project, Draft Environmental Impact Statement (DOE/EIS-0464D) Location: Lake Charles, Louisiana located in Calcasieu Parish and West Hastings Oil Field,

434

DOE/EA-1570: Final Environmental Assessment for Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino Appearance Experiment at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70 70 FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment for Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino (ν e ) Appearance Experiment (NOvA) at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota U.S. Department of Energy, Lead Agency Fermi Site Office Batavia, IL U.S. Army Corps of Engineers, Cooperating Agency St. Paul District St. Paul, MN June 2008 (DOE/EA-1570) NOvA Environmental Assessment June 2008 ii DISCLAIMER Reference herein to any specific commercial product, process or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

435

Webinar: DOE Analysis Related to H2USA  

Energy.gov (U.S. Department of Energy (DOE))

Video recording and text version of the webinar titled, DOE Analysis Related to H2USA, originally presented on July 24, 2013.

436

DOE-CBFO-09-3441 FRAM REV 1  

NLE Websites -- All DOE Office Websites (Extended Search)

MATRIX Directive No. Directive Title Responsible CBFO Org Contractor Requirements Document (CRD)? DOE O 100.1 Secretarial Succession, Threat Level Notification, and...

437

Multispectral Imaging At Glass Buttes Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Retrieved from "http:en.openei.orgwindex.php?titleMultispectralImagingAtGlassButtesArea(DOEGTP)&oldid511008" Categories: Geothermal Exploration Activities DOE...

438

DOE/NBS (Department of Energy/National Bureau of Standards) forum on testing and rating procedures for consumer products, October 2-3, 1985. Final report  

SciTech Connect

One hundred thirty-four persons participated in a Forum on Testing and Rating Procedures for Consumer Products held at the National Bureau of Standards (NBS), Gaithersburg, Maryland, on October 2-3, 1985. The objectives of the forum, planned in cooperation with various industry associations, were: (1) to provide a line of communication between test procedure users and test-procedure developers; (2) to provide an opportunity for participants to present technical and research issues concerning Department of Energy (DOE) test procedures that need to be addressed; and (3) to assist DOE and NBS in establishing a future agenda for the development and/or revision of testing and rating procedures. The report summarizes discussions, conclusions and recommendations developed by the forum participants for the following consumer products: heat pumps and air conditioners; furnaces, boilers, and household heaters; water heaters; refrigerators, refrigerator-freezers and freezers.

Dikkers, R.D.

1986-07-01T23:59:59.000Z

439

Maintenance and operation of the U.S. DOE Alternative Fuel Center. Final subcontract report, 5 August 1994--4 August 1995  

SciTech Connect

The Alternative Fuel Center (AFC) was established by the US Department of Energy (DOE) as part of the Alternative Fuel Utilization Program (AFUP). The AFC is designed to provide drum quantities of finished transportation fuels from a variety of sources. DOE funded the design, construction, and installation of a hydrogenation pilot plant capable of performing a range of hydrotreating, reforming, and hydrocracking operations. Southwest Research Institute provided the building, utilities, and laboratory and safety systems needed for the pilot plant. The AFC work reported here contributes to the two primary objectives of the AFUP: data for alternative-fuel-capable vehicles to enhance energy security, and data for controlling emissions for improved air quality.

Erwin, J.; Moulton, D.S. [Southwest Research Inst., San Antonio, TX (United States)

1996-04-01T23:59:59.000Z

440

Radiological health review of the Final Environmental Impact Statement Waste Isolation Pilot Plant. Volumes 1 and 2. DOE/EIS-0026  

SciTech Connect

Purpose of the Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the potential radiation exposure to people from the proposed Federal radioactive Waste Isolation Pilot Plant (WIPP) near Carlsbad, in order to protect the public health and safety and ensure that there is minimal environmental degradation. Analyses are conducted of reports issued by the US DOE and its contractors, other Federal agencies and other organizations, as they relate to the potential health, safety and environmental impacts from WIPP.

Not Available

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOE Technical Standards Program: Online Approved DOE Technical Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Online Approved DOE Technical Standards Online Approved DOE Technical Standards No. 1001 – 2000 No. 3001 – 4000 No. 4001 – 5500 No. 5501 – 6000 No. 6001 – 6500 No. 7501 – 7750 Document Number Range 1001 – 2000 Number Title DOE-HDBK-1001-96 Guide to Good Practices for Training and Qualification of Instructors (80 pages) PDF (226 KB) DOE-HDBK-1002-96 Guide to Good Practices for Training and Qualification of Chemical Operators (70 pages) PDF (311 KB) DOE-HDBK-1003-96 Guide to Good Practices for Training and Qualification of Maintenance Personnel (106 pages) PDF (391 KB) DOE-HDBK-1010-92 (Reaffirmed 1999) DOE Fundamentals Handbook, Classical Physics (142 pages) PDF (1120 KB) DOE-HDBK-1011/1-92 (Reaffirmed 1999) DOE Fundamentals Handbook, Electrical Science, Volume 1 of 4 (166 pages) PDF (4255 KB)

442

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

443

Microsoft Word - Rowan_Final_Feb_2006.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Report Title A Data Fusion System for the Nondestructive Report Title A Data Fusion System for the Nondestructive Evaluation of Non-Piggable Pipes Type of Report Final Report Reporting Period Start Date October 1, 2002 Reporting Period End Date March 31, 2005 Principal Author(s) Dr. Shreekanth Mandayam (PI), Dr. Robi Polikar (Co-PI), Dr. John C. Chen (Co-PI) Date Report was Issued February 2006 DOE Award Number DE-FC26-02NT41648 Name and Address of the Submitting Organization Rowan University 201 Mullica Hill Road Glassboro, NJ 08028 2 Disclaimer "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or

444

DOE/EIS-0353; South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Fork Flathead Watershed South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program Final Environmental Impact Statement Bonneville Power Administration July 2005 South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agencies: U.S. Department of Agriculture, Forest Service (FS) and State of Montana Fish, Wildlife, and Parks (MFWP) Department Title of Proposed Project: South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program State Involved: Montana Abstract: In cooperation with MFWP, BPA is proposing to implement a conservation program to preserve the genetic

445

EA-1399: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

99: Final Environmental Assessment 99: Final Environmental Assessment EA-1399: Final Environmental Assessment Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. (Figures 1 and 2). This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 Code of Federal Regulations Part 192, Subpart B, in areas where ground water beneath and around the site is

446

EA-1268: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1268: Final Environmental Assessment EA-1268: Final Environmental Assessment EA-1268: Final Environmental Assessment Ground Water Compliance at the Tuba City Uranium Mill Tailings Site The U.S. Department of Energy (DOE) has selected a ground water compliance strategy for the Tuba City Uranium Mill Tailings Remedial Action (UMTRA) Project site (Tuba City site). This compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40, Part 192 of the U.S. Code of Federal Regulations (40 CFR 192) entitled "Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings." Contamination in the ground water consists of residual radioactive material, which is defined in the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) (42 U.S. Code, Section 4321

447

EA-0073: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-0073: Final Environmental Assessment EA-0073: Final Environmental Assessment EA-0073: Final Environmental Assessment Yucca Mountain Site, Nevada Research and Development Area, Nevada The Nuclear Waste Policy Act of 1982 (the Act) established a process for the selection of sites for the disposal of spent nuclear fuel and high-level radioactive waste in geologic repositories. The first steps in this process were the identification of potentially acceptable sites and the development of general guidelines for siting repositories. In February 1983 the DOE identified nine sites in six States as potentially acceptable for the first repository. The Yucca Mountain site in Nye County, Nevada, was identified as one of those sites. The general guidelines were issued in November 1984 as Title 10 of the Code of Federal Regulations, Part 960. The

448

DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volumes IV Volumes IV Chapters 4 -5 Comment Responses U.S. Department of Energy Office of Environmental Management Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Final Environmental Impact Statement i Contents Volume IV 4.0 Responses............................................................................................................................4-1 4.1 Response Index Tables ..............................................................................................4-1 4.2 Responses to Comments ..........................................................................................4-70 5.0 References...........................................................................................................................5-1

449

EIS-0161: Final Programmatic Environmental Impact Statement ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain...

450

ERDA-1537: Final Environmental Impact Statement | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on...

451

Enhancements to and Characterization of the Very Early Time Electromagnetic (VETEM) Prototype Instrument and Applications to Shallow Subsurface Imaging at Sites in the DOE Complex - Final Report  

SciTech Connect

Field tests and deployments of VETEM is a flexible and highly effective new system for electromagnetic imaging that offers significant new 3D electromagnetic imaging capabilities in the shallow subsurface. Important new numerical modeling techniques have been produced, which are applicable to electromagnetic subsurface imaging, and suggest further research and development. In addition, this research has also produced a flexible, fast, and fully functional prototype VETEM system that has produced some remarkable subsurface images, has bridged the gap between pure research and applications, and is now available for use at DOE sites that have shallow subsurface imaging needs.

Wright, D.L.; Chew, W.C.

2000-12-01T23:59:59.000Z

452

DOE A9024 Final Report Functional and Nanoscale Materials Systems: Frontier Programs of Science at the Frederick Seitz Materials Research Laboratory  

SciTech Connect

The scientific programs of the FSMRL supported under the DOE A9024 Grant consisted of four interdisciplinary research clusters, as described. The clusters were led by Professors Tai Chiang (Physics), Jeffrey Moore (Chemistry), Paul Goldbart (Physics), and Steven Granick (Materials Science and Engineering). The completed work followed a dominant theme--Nanoscale Materials Systems--and emphasized studies of complex phenomena involving surfaces, interfaces, complex materials, dynamics, energetics, and structures and their transformations. A summary of our key accomplishments is provided for each cluster.

Lewis, Jennifer A.

2009-03-24T23:59:59.000Z

453

Using EnergyPlus for California Title-24 compliancecalculations  

SciTech Connect

For the past decade, the non-residential portion of California's Title-24 building energy standard has relied on DOE-2.1E as the reference computer simulation program for development as well as compliance. However, starting in 2004, the California Energy Commission has been evaluating the possible use of Energy Plus as the reference program in future revisions of Title-24. As part of this evaluation, the authors converted the Alternate Compliance Method (ACM) certification test suite of 150 DOE-2 files to Energy Plus, and made parallel DOE-2 and Energy Plus runs for this extensive set of test cases. A customized version of DOE-2.1E named doe2ep was developed to automate the conversion process. This paper describes this conversion process, including the difficulties in establishing an apples-to-apples comparison between the two programs, and summarizes how the DOE-2 and Energy Plus results compare for the ACM test cases.

Huang, Joe; Bourassa, Norman; Buhl, Fred; Erdem, Ender; Hitchcock, Rob

2006-08-26T23:59:59.000Z

454

Optimizing operational flexibility and enforcement liability in Title V permits  

SciTech Connect

Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

McCann, G.T. [Rust Environment and Infrastructure Inc., Greenville, SC (United States)

1997-12-31T23:59:59.000Z

455

Final Report on Funding to Support the Participation of Scientists Engaged in DOE Research in the 2008 AGU Chapman Conference on Biogeophysics  

SciTech Connect

This project provided travel awards for scientists engaged in research relevant to the DOE mission to participate in the American Geophysical Union (AGU) Chapman Conference on Biogeophysics held October 13-16, 2008, in Portland, Maine (http://www.agu.org/meetings/chapman/2008/fcall/). The objective of this Chapman Conference was to bring together geophysicists, biophysicists, geochemists, geomicrobiologists, and environmental microbiologists that are leaders in their field and have a personal interest in exploring this new interdisciplinary field or are conducting multidisciplinary research with potential impact on biogeophysics in order to define the current state of the science, identify the critical questions facing the community and to generate a roadmap for establishing biogeophysics as a critical subdiscipline of earth science research. The sixty participants were an international group of academics, graduate students and scientists at government laboratories engaged in biogeophysics related research. Scientists from Europe, Israel and China traveled to engage North American colleagues in this highly focused 3.5 day meeting. The group included an approximately equal mix of microbiologists, biogeochemists and near surface geophysicists. The recipients of the DOE travel awards were [1] Dennis Bazylinski (University of Nevada, Las Vegas), [2] Yuri Gorby (Craig Venter Institute), [3] Carlos Santamarina (Georgia Tech), [4] Susan Hubbard (Lawrence Berkeley Laboratory), [5] Roelof Versteeg (Idaho National Laboratory), [6] Eric Roden (University of Wisconsin), [7] George Luther (University of Delaware), and [8] Jinsong Chen (Lawrence Berkeley Laboratory)

Lee D. Slater

2009-05-11T23:59:59.000Z

456

SciTech Connect: Final Report for proposal "The Interface between...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical Report: Final Report for proposal "The Interface between Earth System Models and Impacts on Society Workshop, Spring 2011 Citation Details In-Document Search Title: Final...

457

DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 -SA-Ol SUPPLEMENT ANALYSIS For The Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement June 2005 United States Department of Energy Idaho Operations Office 1.0 2.0 3.0 4.0 5.0 6.0 DOEÆIS-0287 -SA-O 1 TABLE OF CONTENTS Introduction......................................................................................................................... 4 Background......................................................................................................................... 4 Areas of Review.................................................................................................................. 6 3.1 3.2 3.3 3.4 Proposed Waste Treatment Technology.......... .......................................................

458

DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

II II Appendices A-H U.S. Department of Energy Office of Environmental Management Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Final Environmental Impact Statement i Contents Page Volume II Appendix A, Biological Assessment/Screening Level Risk Assessment/Biological Opinion Appendix A1, Biological Assessment A1-1.0 Introduction ..............................................................................................................A1-1 A1-2.0 Species Evaluated.....................................................................................................A1-3 A1-2.1 Critical Habitat..................................................................................................A1-3 A1-3.0 Consultation to Date.................................................................................................A1-4

459

TITLE48CHAPTER9  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

460

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

822 822 Idaho National Laboratory Stand-Off Experiment (SOX) Range Environmental Assessment Final March 2011 DOE/EA-1822 Idaho National Laboratory Stand-Off Experiment (SOX) Range Environmental Assessment Final March 2011 Prepared for the U.S. Department of Energy Idaho Operations Office i CONTENTS ACRONYMS ............................................................................................................................................... iii GLOSSARY ................................................................................................................................................. v EXECUTIVE SUMMARY ........................................................................................................................ vii

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

76 76 Idaho National Laboratory Radiological Response Training Range Environmental Assessment Final October 2010 DOE/EA-1776 Idaho National Laboratory Radiological Response Training Range Environmental Assessment Final October 2010 Prepared for the U.S. Department of Energy Idaho Operations Office i CONTENTS GLOSSARY ................................................................................................................................................ iii EXECUTIVE SUMMARY .......................................................................................................................... v 1.0 PURPOSE AND NEED ..................................................................................................................... 1 2.0 ALTERNATIVES .............................................................................................................................. 2

462

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Idaho National Laboratory Radiological Response Training Range Environmental Assessment Final October 2010 DOE/EA-1776 Idaho National Laboratory Radiological Response Training Range Environmental Assessment Final October 2010 Prepared for the U.S. Department of Energy Idaho Operations Office i CONTENTS GLOSSARY ................................................................................................................................................ iii

463

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 Idaho National Laboratory Stand-Off Experiment (SOX) Range Environmental Assessment Final March 2011 DOE/EA-1822 Idaho National Laboratory Stand-Off Experiment (SOX) Range Environmental Assessment Final March 2011 Prepared for the U.S. Department of Energy Idaho Operations Office i CONTENTS ACRONYMS ............................................................................................................................................... iii

464

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Main Text and Appendixes A-H 1: Main Text and Appendixes A-H June 2004 U.S. Department of Energy Office of Environmental Management Cover Sheet Portsmouth DUF 6 Conversion Final EIS iii COVER SHEET * RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Ports_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

465

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Portsmouth DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Ports_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

466

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Paducah DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process,

467

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Main Text and Appendixes A-H 1: Main Text and Appendixes A-H June 2004 U.S. Department of Energy Office of Environmental Management Cover Sheet Paducah DUF 6 Conversion Final EIS iii COVER SHEET * RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

468

Microsoft PowerPoint - Risk_Portfolio_Manager(RPM)_overview_Under_Sec_DOE__2011_V4 Final 3-22-2011.ppt [Read-Only] [Compatibili  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporate Headquarters: Corporate Headquarters: Risk Management: Overview of 1010 Wayne Avenue, Suite 1150 Silver Spring, Maryland 20910 301.565.2988 Telephone 301.565.2995 Facsimile www.e-mcinc.com Overview of e-Gov Risk Portfolio Manager(tm) (e Gov RPM(tm)) V4 Satellite Offices: 80 M Street, S.E., Suite 715 Washington, DC 20003 13800 Coppermine Road, Suite 221 (e-Gov RPM(tm)) V4 for Under Secretary of Energy 13800 Coppermine Road, Suite 221 Herndon, Virginia 20171 e-Management - Proprietary Information March 2011 Today's Agenda 1) eGov RPM and use at DOE EM 2) Overview of the capabilities of eGov RPM(tm) 3) eGov RPM supports the Under Secretary of Energy's Program Cyber Security Plan (PCSP) Cyber Security Plan (PCSP) e-Management - Proprietary Information 2 e-Gov Risk Portfolio Manager is a multi-user, web based tool used for continuous monitoring

469

DOE/EIS-0397: Record of Decision for the Lyle Falls Fish Passage Project Final Environmental Impact Statement (2/20/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION NATIONAL ENVIRONMENTAL POLICY ACT RECORD OF DECISION Lyle Falls Fish Passage Project SUMMARY The Bonneville Power Administration (BPA) has decided to fund modifications to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, Washington. In addition to improving fish passage to the upper part of the Klickitat River watershed, the modifications will facilitate collection and monitoring of biological information for future fishery management and enhance opportunities for adult salmonids to access and utilize habitat in the upper Klickitat River. This decision implements the Proposed Action and Preferred Alternative identified in the Lyle Falls Fish Passage Project (Lyle Falls) EIS (DOE/EIS-0397, November 2008). BPA was

470

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

471

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

472

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

473

Title IX: More than Just Sports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title IX: More than Just Sports Title IX: More than Just Sports Title IX: More than Just Sports June 23, 2011 - 5:41pm Addthis Bill Valdez Bill Valdez Principal Deputy Director What does this mean for me? The Department works to ensure there is no discrimination on the basis of gender in educational programs at institutions that receive Federal financial assistance. Office of Civil Rights staff work to ensure that the recruitment, retention, training and education practices at schools are inclusive for both men and women. Most people think sports when they think about Title IX. However, Title IX's scope is much broader than that, and the Energy Department actively works to help ensure that there is no discrimination on the basis of gender in educational programs at institutions that receive Federal financial

474

Microsoft Word - Loan Guarantee NOPR -Final_5-09-07_FR 2 _2_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[6450-01-P] [6450-01-P] DEPARTMENT OF ENERGY 10 CFR Part 609 RIN 1901-AB21 Loan Guarantees for Projects that Employ Innovative Technologies AGENCY: Office of the Chief Financial Officer, Department of Energy. ACTION: Notice of Proposed Rulemaking and Opportunity for Comment. SUMMARY: The Department of Energy (DOE or Department) today proposes policies and procedures applicable to DOE's loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005. Today's proposed rule, when final, also will further the President's Advanced Energy Initiative. Title XVII authorizes the Secretary of Energy to make loan guarantees for projects that "avoid, reduce, or sequester air pollutants or anthropogenic emissions of greenhouse gases; and employ new or significantly improved

475

GDB - Human Genome Database final report  

SciTech Connect

This is the DOE final report for the GDB, Human Genome Database, project at the Johns Hopkins University.

Talbot, C. Conover, Jr.

2002-01-08T23:59:59.000Z

476

DOE/EIS-0236/SA-6 Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: REPLY TO ATTN OF: DP-45 (G. Palmer, 6-1785) SUBJECT: DETERMINATION OF THE NEED FOR ADDITIONAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REVIEW TO: Dave Beck, DP-20 As requested in your action memorandum, same subject, I have reviewed the attached Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement, dated August 1999. This analysis was prepared in accordance with 10 CFR 1021.314, contains the comments on the draft Supplement Analysis, dated June 1999, and responds to the comments in Appendix D. Based on my review of the six issues analyzed in the Supplement Analysis, I have determined that none of the information and analysis represent substantial changes to the actions

477

Project Year Project Title  

E-Print Network (OSTI)

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

478

Project Year Project Title  

E-Print Network (OSTI)

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

479

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

480

Project Year Project Title  

E-Print Network (OSTI)

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

Note: This page contains sample records for the topic "doe title final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

482

DOE Approved Technical Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards Program » DOE DOE Technical Standards Program » DOE Approved Technical Standards DOE Approved Technical Standards Document ID Filter Document ID sort ascending Title Date DOE-STD-7501-99 The DOE Corporate Lessons Learned Programs Superseding DOE-STD-7501-95 Including Change Notice No. 1 (September 1997) This technical standard provides management expectations and a framework for the DOE Corporate Lessons Learned Program. The framework is intended to support development and implementation of a DOE-wide lessons learned infrastructure 01/20/2000 DOE-STD-6005-01 Industrial Hygiene Practices This standard recommends industrial hygiene practices to support components of the Worker Protection Program required by Department of Energy (DOE) Order 440.1A, “Worker Protection Management for DOE Federal and Contractor Employees. 04/30/2001

483

DOE/EA-1807  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 FINAL ENVIRONMENTAL ASSESSMENT FOR HEARTLAND COMMUNITY COLLEGE WIND ENERGY PROJECT NORMAL, MCLEAN COUNTY, ILLINOIS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office DECEMBER 2010 DOE/EA 1807 FINAL ENVIRONMENTAL ASSESSMENT FOR HEARTLAND COMMUNITY COLLEGE WIND ENERGY PROJECT NORMAL, MCLEAN COUNTY, ILLINOIS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office DECEMBER 2010 DOE/EA 1807 iii December 2010 C OV E R S HE E T R E SPONSI B L E A G E NC Y : U.S. Department of Energy (DOE) T I T L E : Final Environmental Assessment for Heartland Community College Wind Energy Project, Normal, McLean County, Illinois (DOE/EA 1807). C ONT A C T : For additional copies or more information on this Environmental Assessment

484

Final report on activities and findings under DOE grant Interactive Photochemistry in Earth System Models to Assess Uncertainty in Ozone and Greenhouse Gases  

SciTech Connect

Atmospheric chemistry controls the abundances and hence climate forcing of important greenhouse gases including N2O, CH4, HFCs, CFCs, and O3. Attributing climate change to human activities requires, at a minimum, accurate models of the chemistry and circulation of the atmosphere that relate emissions to abundances. This DOE-funded research provided realistic, yet computationally optimized and affordable, photochemical modules to the Community Earth System Model (CESM) that augment the CESM capability to explore the uncertainty in future stratospheric-tropospheric ozone, stratospheric circulation, and thus the lifetimes of chemically controlled greenhouse gases from climate simulations. To this end, we have successfully implemented Fast-J (radiation algorithm determining key chemical photolysis rates) and Linoz v3.0 (linearized photochemistry for interactive O3, N2O, NOy and CH4) packages in LLNL-CESM and for the first time demonstrated how change in O2 photolysis rate within its uncertainty range can significantly impact on the stratospheric climate and ozone abundances. From the UCI side, this proposal also helped LLNL develop a CAM-Superfast Chemistry model that was implemented for the IPCC AR5 and contributed chemical-climate simulations to CMIP5.

Prather, Michael J. [UCI

2014-11-07T23:59:59.000Z

485

DOE Solar Energy Technologies Program TPP Final Report - A Value Chain Partnership to Accelerate U.S. PV Industry Growth, GE Global Research  

SciTech Connect

General Electrics (GE) DOE Solar Energy Technologies TPP program encompassesd development in critical areas of the photovoltaic value chain that affected the LCOE for systems in the U.S. This was a complete view across the value chain, from materials to rooftops, to identify opportunities for cost reductions in order to realize the Department of Energys cost targets for 2010 and 2015. GE identified a number of strategic partners with proven leadership in their respective technology areas to accelerate along the path to commercialization. GE targeted both residential and commercial rooftop scale systems. To achieve these goals, General Electric and its partners investigated three photovoltaic pathways that included bifacial high-efficiency silicon cells and modules, low-cost multicrystalline silicon cells and modules and flexible thin film modules. In addition to these technologies, the balance of system for residential and commercial installations were also investigated. Innovative system installation strategies were pursed as an additional avenue for cost reduction.

Todd Tolliver; Danielle Merfeld; Charles Korman; James Rand; Tom McNulty; Neil Johnson; Dennis Coyle

2009-07-31T23:59:59.000Z

486

DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-1999/cover.HTML[6/24/2011 1:11:59 PM] 1-1999/cover.HTML[6/24/2011 1:11:59 PM] COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement (EIS) (DOE/EIS- 0290) Location: Idaho National Engineering and Environmental Laboratory (INEEL) Contacts: For further information on this environmental impact statement (EIS), call: 1-800-708-2680 or contact: Mr. John E. Medema AMWTP EIS Document Manager DOE Idaho Operations Office 850 Energy Drive, MS 1117 Idaho Falls, ID 83403 (208) 526-1407 For further information on the DOE National Environmental Policy Act (NEPA) process, leave a message at: 1-800-472-2756 or contact: Ms. Carol Borgstrom Director Office of NEPA Policy and Assistance (EH-42) Office of Environment, Safety and Health

487

GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM The Department of Energy has on a variety of occasions engaged in transactions under which it bartered uranium to which it has title for goods or services . This guidance memorializes the results of analyses previously directed to individual proposed transactions . For the reasons discussed below, we conclude that the Atomic Energy Act of 1954' , as amended, (AEA), authorizes such barter transactions. GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM More Documents & Publications Leasing of Department of Energy Property Before the Senate Energy and Natural Resources Subcommittee on Energy EIS-0468: Final Environmental Impact Statement

488

103 Teams to Head to DOE's National Science Bowl in Washington, D.C. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Teams to Head to DOE's National Science Bowl in Washington, 3 Teams to Head to DOE's National Science Bowl in Washington, D.C. 103 Teams to Head to DOE's National Science Bowl in Washington, D.C. April 23, 2009 - 12:00am Addthis WASHINGTON, DC- Students from 67 high school teams and 36 middle school teams from across the nation will compete next weekend for championship titles in the U.S. Department of Energy's (DOE) National Science Bowl in Washington D.C. The National Science Bowl is the nation's largest academic competition of its kind and the only one sponsored by a federal agency. The National Finals will be held from May 2 through May 4. Each of the participating teams emerged from a regional competition to earn an all-expense-paid trip to the event. The participating teams represent 42 states, the District of Columbia, the U.S. Virgin Islands and Puerto

489

DOE 11  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE A ward N o.: D E--NT0005665 Final T echnical R eport (October 2 008 - S eptember 2 012) Source c haracterization a nd t emporal variation o f m ethane s eepage f rom thermokarst l akes o n t he A laska N orth S lope in r esponse t o A rctic c limate c hange Submitted b y: University o f A laska Fairbanks, A K 9 9775 Prepared for: United S tates D epartment o f E nergy National E nergy T echnology L aboratory May 29 th 2013 Office of Fossil Energy 2 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any

490

DOE SciDACs Earth System Grid Center for Enabling Technologies Final Report for University of Southern California Information Sciences Institute  

SciTech Connect

The mission of the Earth System Grid Federation (ESGF) is to provide the worldwide climate-research community with access to the data, information, model codes, analysis tools, and intercomparison capabilities required to make sense of enormous climate data sets. Its specific goals are to (1) provide an easy-to-use and secure web-based data access environment for data sets; (2) add value to individual data sets by presenting them in the context of other data sets and tools for comparative analysis; (3) address the specific requirements of participating organizations with respect to bandwidth, access restrictions, and replication; (4) ensure that the data are readily accessible through the analysis and visualization tools used by the climate research community; and (5) transfer infrastructure advances to other domain areas. For the ESGF, the U.S. Department of Energys (DOEs) Earth System Grid Center for Enabling Technologies (ESG-CET) team has led international development and delivered a production environment for managing and accessing ultra-scale climate data. This production environment includes multiple national and international climate projects (such as the Community Earth System Model and the Coupled Model Intercomparison Project), ocean model data (such as the Parallel Ocean Program), observation data (Atmospheric Radiation Measurement Best Estimate, Carbon Dioxide Information and Analysis Center, Atmospheric Infrared Sounder, etc.), and analysis and visualization tools, all serving a diverse user community. These data holdings and services are distributed across multiple ESG-CET sites (such as ANL, LANL, LBNL/NERSC, LLNL/PCMDI, NCAR, and ORNL) and at unfunded partner sites, such as the Australian National University National Computational Infrastructure, the British Atmospheric Data Centre, the National Oceanic and Atmospheric Administration Geophysical Fluid Dynamics Laboratory, the Max Planck Institute for Meteorology, the German Climate Computing Centre, the National Aeronautics and Space Administration Jet Propulsion Laboratory, and the National Oceanic and Atmospheric Administration. The ESGF software is distinguished from other collaborative knowledge systems in the climate community by its widespread adoption, federation capabilities, and broad developer base. It is the leading source for present climate data holdings, including the most important and largest data sets in the globalclimate community, andassuming its development continueswe expect it to be the leading source for future climate data holdings as well. Recently, ESG-CET extended its services beyond data-file access and delivery to include more detailed information products (scientific graphics, animations, etc.), secure binary data-access services (based upon the OPeNDAP Data Access Protocol), and server-side analysis. The latter capabilities allow users to request data subsets transformed through commonly used analysis and intercomparison procedures. As we transition from development activities to production and operations, the ESG-CET team is tasked with making data available to all users seeking to understand, process, extract value from, visualize, and/or communicate it to othersthis is of course if funding continues at some level. This ongoing effort, though daunting in scope and complexity, would greatly magnify the value of numerical climate model outputs and climate observations for future national and international climate-assessment reports. The ESG-CET team also faces substantial technical challenges due to the rapidly increasing scale of climate simulation and observational data, which will grow, for example, from less than 50 terabytes for the last Intergovernmental Panel on Climate Change (IPCC) assessment to multiple Petabytes for the next IPCC assessment. In a world of exponential technological change and rapidly growing sophistication in climate data analysis, an infrastructure such as ESGF must constantly evolve if it is to remain relevant and useful.

Chervenak, Ann Louise [University of Southern California] [University of Southern California

2013-12-19T23:59:59.000Z

491

DOE ER63951-3 Final Report: An Integrated Assessment of Geochemical and Community Structure Determinants of Metal Reduction Rates in Subsurface Sediments  

SciTech Connect

The objective of this research was to examine the importance of microbial community structure in influencing uranium reduction rates in subsurface sediments. If the redox state alone is the key to metal reduction, then any organisms that can utilize the oxygen and nitrate in the subsurface can change the geochemical conditions so metal reduction becomes an energetically favored reaction. Thus, community structure would not be critical in determining rates or extent of metal reduction unless community structure influenced the rate of change in redox. Alternatively, some microbes may directly catalyze metal reduction (e.g., specifically reduce U). In this case the composition of the community may be more important and specific types of electron donors may promote the production of communities that are more adept at U reduction. Our results helped determine if the type of electron donor or the preexisting community is important in the bioremediation of metal-contaminated environments subjected to biostimulation. In a series of experiments at the DOE FRC site in Oak Ridge we have consistently shown that all substrates promoted nitrate reduction, while glucose, ethanol, and acetate always promoted U reduction. Methanol only occasionally promoted extensive U reduction which is possibly due to community heterogeneity. There appeared to be limitations imposed on the community related to some substrates (e.g. methanol and pyruvate). Membrane lipid analyses (phospholipids and respiratory quinones) indicated different communities depending on electron donor used. Terminal restriction fragment length polymorphism and clone libraries indicated distinct differences among communities even in treatments that promoted U reduction. Thus, there was enough metabolic diversity to accommodate many different electron donors resulting in the U bioimmobilization.

Susan Pfiffner

2010-06-28T23:59:59.000Z

492