National Library of Energy BETA

Sample records for doe richland operations

  1. DOE Names New Richland Operations Manager

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announced today the selection of Stacy Charboneau as the Manager of the Richland Operations Office (DOE-RL) at the Hanford Site in southwest Washington State.

  2. DOE Issues Request for Information for Richland Operations Office...

    Office of Environmental Management (EM)

    Contract Acquisition Planning- Occupational Medical Services (OccMed) DOE Issues Request for Information for Richland Operations Office Richland Acquisitions - Post Fiscal Year ...

  3. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office...

  4. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  5. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    otoM of 06735761 53 ~ Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 05-AMRC-OO38 Distribution TRANSMITTAL OF COMMENT RESPONSE MATRIX FOR THE, "RlSK ASSESSMENT WORK PLAN FOR THE 100 AREA AND 300 AREA COMPONENT OF THE RCBRA" (DOE/RL-2004-37 DRAFT A) Thank you for your comments submitted on Draft A of the Risk Assessment Work Plan for the 100 Area and 300 Area Component of the RCBRA (DOE~2004-37, Draft A). Attached is the comment-response matrix

  6. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  7. Media Contact: Mark Heeter, DOE Richland Operations Office, 509-373-1970

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mark Heeter, DOE Richland Operations Office, 509-373-1970 For Immediate Release March 31, 2016 Manhattan Project National Historical Park at Hanford Expands 2016 Tour Season RICHLAND, Wash. - In partnership with the National Park Service (NPS), the U.S. Department of Energy (DOE) will open registration for the Manhattan Project National Historical Park's 2016 public tour season at the Hanford, Wash., sites on Monday, April 4, at 8:00 a.m. PDT. Hanford is one of the three primary Manhattan

  8. DOE Recognizes EM Richland Operations Office Employees for Excellence in

    Energy Savers [EERE]

    International Airport | Department of Energy Mast Lighting at Philadelphia International Airport DOE Publishes GATEWAY Report on High-Mast Lighting at Philadelphia International Airport November 10, 2015 - 5:02pm Addthis The U.S. Department of Energy's GATEWAY program has released a report on a trial installation of LED apron lighting at Philadelphia International Airport (PHL). In addition to reducing energy, PHL also hoped to reduce required maintenance, reduce light pollution, and

  9. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    j;. ~.Department of Energy Richland Operations Office P.O. Box 550 ZATES~Richland, Washington 99352 July 29, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 1hStreet Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-01599) You requested, pursuant to the Freedom of Information Act (FOJA), the following information: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ' 5 ~7AE d~Richland, Washington 99352 10-AMSE-0055 APR 0 9 2010 Mr. M. N. Brosee, President Washington Closure Hanford LLC Richland, Washington 99354 Dear Mr. Brosee: CONTRACT NO. DE-AC06-05RL14655 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HAS QARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J-2, List B: Applicable DOE Directives). The HASQARD contains the standards for site sampling and analytical

  11. Independent Specific Administrative Controls Review, Richland Operations Office- December 2010

    Broader source: Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ZATESO~'P.O. Box 550 E Richland, Washington 99352 11 -SED-0 124 JUL 0 7 2Mt Mr. J. G. Lehew 111, President and Chief Executive Officer CH2M HILL Plateau Remnediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-ACO6-08RL 14788 - TRANSN4ITTAL OF SURVEILLANCE REPORT PLANNING AND EXECUTION OF RADIOLOGICAL WORK (S-1I l-SFD-CHPRC-PFP-002) Pursuant to Clause E. 1, "DOE Inspection and Acceptance," this letter transmits Surveillance Report S-1 I -SED-CHPRC-PFP-002. The

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 ~4TES~Richland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington 99352 Dear Mr. Figueroa: CONTRACT NO. DE-AC06-09RL 14728 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Section J, Table J-2.9). The HASQARD contains the standards for site sampling and

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to) Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 r OV( 4 2009 CERTIFIED MAIL Mr. Bryan Evenson Thorner, Kennedy & Gano P.S. P.O. Box 1410 Yakima, Washington 98907-14 10 Dear Mr. Evenson: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-00208) Pursuant to the Freedom of Information Act, you requested two prints, a negative, and a high resolution digital scan of May 1943 aerial photographs L26-12 and L-26-3. In addition, you requested the photographs be

  15. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract(s) Acquisition Planning

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for a potential upcoming competitive Environmental Management (EM) procurement(s) for the environmental cleanup projects and Hanford Site infrastructure and services at the Richland Operations Office (RL), hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 Contract(s)” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  16. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  17. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESO~Richland, Washington 99352 August 4, 2009 Certified Mail Mr. Thomas Zeilman Law Office of Thomas Zeilamn P.O. Box 34 Yakima, Washington 98907 Dear Mr. Zeilman: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0041) You requested, pursuant to the Freedom of Information Act (FOJA), documents regarding any decisions made by the U.S. Department of Energy (DOE) to prohibit hunting or trapping of the Rattlesnake Hills Elk Herd within the Fitzner-Eberhart Arid Lands Ecology Reserve at the Hanford

  18. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Richland, Washington 99352 Certified Mail Mr. Thomas Zeilman Law Office of Thomas Zeilamn JUN 1 5 2009 P.O. Box 34 Yakima, Washington 98907 Dear Mr. Zeilman: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0041) You requested, pursuant to the Freedom of Information Act (FOJA), documents regarding any decisions made by the U.S. Department of Energy (DOE) to prohibit hunting or trapping of the Rattlesnake Hills Elk Herd within the Fitzner-Eberhart Arid Lands Ecology Reserve at the Hanford Reach

  19. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  20. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 4TESRichland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington...

  1. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... electrical conductors in accordance with NFPA 70E. Further, it was apparent based upon ... Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - ...

  2. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S2ATES~*Richland, Washington 99352 CERTIFIED MAIL NOV Ii~ 2009 Mr. Marvin Kinney Port of Benton 3 100 George Washington Way Richland, Washington 99354 Dear Mr. Kinney: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00296) Pursuant to the Freedom of Information Act, you requested Contract AT-45-1I-GEN 21 between the Atomic Energy Commission and the Northern Pacific Railway Company dated December 7, 1948. We have conducted a thorough search and were unable to locate the contract. This search was

  3. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 TL~ Rich land, Washington 99352 APR 0 22012 1 2-EMD-0057 Addressees - See Attached SUPPLEMENT TO DOE/RL-201 1-27, HANFORD SITE AIR OPERATING PERMIT (AOP) RENEWAL APPLICATION: COVERING THE PERIOD JANUARY 1, 2011, THROUGH DECEMBER 31, 2011 (DOE/RL-201 2-04, REV. 0) Enclosed is DOE/RL-20 12-04, Supplement to DOE/RL-20 11-27, "Hanford Site AOP Renewal Application: Covering the period January 1, 2011, through December 31, 2011." The AOP Renewal Application Supplement is being submitted in

  4. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4TES~Richland, Washington 99352 August 5, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-01599) You requested, pursuant to the Freedom of Information Act (FOIA), the following informnation: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009 from the Environmental Restoration Disposal Facility (ERDF) at the

  5. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland, Washington 99352 May 3, 2012 CERTIFIED MAIL Mr. Thomas Carpenter Hanford Challenge 219 1 St Avenue South, Suite 120 Seattle, Washington 98104 Dear Mr. Carpenter: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 12-00870) You requested, pursuant to the Freedom of Information Act (FOLA), the following records generated in connection with a surveillance report entitled, "Review of the 100 K Infrastructure Utilities Upgrade Project:" 1. "A copy of the Surveillance report." 2.

  6. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office (58.17 KB) More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - GovTrip (DOE data)

  7. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATES Richland, Washington 99352 CERTIFIED MAIL SEP 1 4 2009 Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) This letter is a partial response to your letters dated June 22, 2009, and July 15, 2009. In response to item 8, you requested "any records and documents relating to the contingency plan required pursuant to Washington Administrative Code Sections 173-303-806,

  8. Richland Operations Office technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  9. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Significant Deficiencies: DOE did not award any additional provisional payment of fee to ... CONTRACT NO. DE-ACO6-08RL 14788 - FISCAL YEAR (FY) 2009 FEE DETERMINATION AND PAYMENT In ...

  10. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract Acquisition Planning- Occupational Medical Services (OccMed)

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for the upcoming competitive Environmental Management (EM) procurement for the Hanford Site occupational medical services, hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 OccMed Contract” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  11. Richland Operations Office Cleanup Strategy, Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  12. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  13. Josh Allen of Richland Operations Office Named 2014 Facility Representative of the Year

    Broader source: Energy.gov [DOE]

    Congratulations to Josh Allen, Richland Operations Office, the winner of the 2014 DOE Facility Representative of the Year Award!

  14. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    SciTech Connect (OSTI)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  15. Josh Allen of Richland Operations Office Named 2014 Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Josh Allen of Richland Operations Office Named 2014 Facility Representative of the Year Josh Allen of Richland Operations Office Named 2014 Facility Representative of the Year May ...

  16. Mark R. Hahn of the Richland Operations Office presented 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award Mark R. Hahn of the Richland Operations Office presented 2014 Safety System ...

  17. Contractor Fee Payments- Richland Operations Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. 

  18. U Department of Energy Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T01 U Department of Energy Richland Operations Office P.O. Box 550 STESo Richland, Washington 99352 April 29, 2010 Certified Mail Mr. Dvija Bertish Director of Environmnental & Conservation Rosemere Neighborhood Association P.O. Box 61471 Vancouver, Washington 98666 Dear Mr. Bertish: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-013 19) You requested, pursuant to the Freedom of Information Act (FOIA), a copy of the Court Reporter's transcript of the public hearing held in Portland Oregon on

  19. Badge Request System PIA, Richland Operations Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office (67.95 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National Laboratory

  20. Hanford Identification (HID) PIA, Richland Operations Office | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office (69.08 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National

  1. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...

    Energy Savers [EERE]

    (EJTA) PIA, Richland Operations Office More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System...

  2. Hanford People Core (HCP) PIA, Richland Operations Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office Hanford People Core (HCP) PIA, Richland Operations Office (140.49 KB) More Documents & Publications E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory

  3. DOE, City of Richland and Benton PUD Increase Fiber Optic Telecommunic...

    Office of Environmental Management (EM)

    DOE and contractor Mission Support Alliance (MSA) collaborated with Benton PUD and the city of Richland to deploy 360 strands of fiber from downtown Richland to north Richland....

  4. Mark R. Hahn of the Richland Operations Office presented 2014 Safety System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight Annual Award | Department of Energy Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award May 21, 2015 - 1:18pm Addthis Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award About 70 Department of Energy (DOE) federal employees serve as Safety System Oversight (SSO) personnel, providing federal

  5. EM's Richland Operations Office Completes Chromium Cleanup along Columbia River

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office and cleanup contractor Washington Closure Hanford have completed cleanup of chromium-contaminated soil along the Columbia River at the Hanford Site.

  6. Independent Activity Report, Richland Operations Office - June 2011 |

    Office of Environmental Management (EM)

    Department of Energy June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations June 13-17, 2011, at the Sludge Treatment Project at the Department of Energy's (DOE) Hanford Site. The activity consisted of touring project

  7. 2014 Annual Planning Summary for the Richland Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications 2011 Annual Planning Summary for Richland Operations Office (RL) 2011 Annual Planning Summary for Office of River Protection (ORP) EIS-0222-SA-01: ...

  8. MEMORANDUM FORMA TTHEW S. MCCORMICK MANAGER RICHLAND OPERATIONS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , SUBJECT: ENVIRONMENTAL MANAGEMENT Delegation of Acquisition Executive AuthorJty for Capital Asset Projects at. Richland Operations Office In accordance with the guidelines of...

  9. 2011 Annual Planning Summary for Richland Operations Office ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments and Environmental Impact Statements for 2011 and 2012 within the Richland Operations Office (RL) (see also Office of River Protection and Environmental Management). ...

  10. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PIA, Richland Operations Office (58.17 KB) More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System ...

  11. Richland Operations Office Makes Progress Removing Drums at Hanford Site

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) and cleanup contractor Washington Closure Hanford (WCH) have excavated and processed the majority of drums at the 618-10 Burial Ground, one of the Hanford Site’s most hazardous burial grounds.

  12. Independent Activity Report, Richland Operations Office - April 2011 |

    Office of Environmental Management (EM)

    Department of Energy Richland Operations Office - April 2011 Independent Activity Report, Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project [HIAR-RL-2011-04-07] This Independent Activity Report documents operational awareness activities conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations between November 2010 and April 2011 at the Hanford Site Sludge Treatment Project.

  13. Richland Badge Request PIA

    Energy Savers [EERE]

    Richland AFGE 788 non-professional Richland AFGE 788 non-professional Richland AFGE 788 non-professional The Department of Energy (DOE) is responsible for one of the largest nuclear cleanup efforts in the world, managing the legacy of five decades of nuclear weapons production. The Hanford site, located at the DOE Richland Operations Office (RL) and the DOE Office of River Protection (ORP) is primarily responsible for contract oversight, safety and compliance-related work for the more than 20

  14. EMs Richland Operations Office Celebrates Disposal Achievement in 2013

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. EM's Richland Operations Office's 2013 accomplishments ranged from cleaning up buildings and waste sites to treating a record amount of groundwater.

  15. U.S. Department of Energy, Richland Operations Office And Mission Support Alliance, LLC Partnering Charter For Partnering Performance Agreement

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) and the Mission Support Alliance, LLC (MSA) are committed to continuous improvement and will partner together to enchance teaming...

  16. Richland Operations Office Cleanup Strategy, Scope

    Broader source: Energy.gov (indexed) [DOE]

    nation's plutonium between 1945-1985 * Home to the first full-scale production reactor (B Reactor) * Transitioned to cleanup in 1989 B Reactor Complex during operations ...

  17. EM Richland Operations Office Manager Reflects on River Corridor's Safe, Successful Cleanup

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – This month, Stacy L. Charboneau marks her first year as manager of EM’s Richland Operations Office (RL), responsible for management and oversight of cleanup of the 586-square-mile Hanford Site.

  18. EM Richland Operations Office Contractor Earns 97 Percent of Available Fee

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) issued its fiscal year 2015 fee determination for Hanford Site contractor CH2M HILL Plateau Remediation Company (CH2M).

  19. Removal of 1,082-Ton Reactor Among Richland Operations Office’s 2014 Accomplishments

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Workers with EM’s Richland Operations Office and its contractors made progress this year in several areas of Hanford site cleanup that helped protect employees, the public, environment, and Columbia River.

  20. Environmental Management Richland Operations Office FY 2014 President's Budget FY 2015 Budget Request Regulator Briefing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acquisition Planning Presented by: Karen Flynn and Ellen Mattlin March 16, 2016 March 2016 2 * River Corridor (WCH) 9/30/2016 * Tank Operations (WRPS) 9/30/2018 * Plateau Remediation (CHPRC) 9/30/2018 * Mission Support (MSA) 5/25/2019 * Occupational Medicine (HPM) 9/30/2018 * Miscellaneous small contracts 2018-2021 DOE Contract Expiration Dates March 2016 3 * The Richland Operations Office created the Office of Hanford Acquisitions (OHA) and the Office of River Protection created an Acquisition

  1. 2014 Annual Planning Summary for the Richland Operations Office and the Office of River Protection

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Richland Operations Office and the Office of River Protection.

  2. 2013 Annual Planning Summary for the Office of River Protection and Richland Operations Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Office of River Protection and Richland Operations Office.

  3. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    SciTech Connect (OSTI)

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  4. Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012

    Broader source: Energy.gov [DOE]

    Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

  5. Environmental Management Richland Operations Office FY 2014 President's Budget FY 2015 Budget Request Regulator Briefing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Briefing FY 2013 Appropriations FY 2014 President's Budget FY 2015 Budget Request Jon Peschong, Richland Operations Office Central Plateau and River Corridor May 8, 2013 Draft Pre-Decisional Information Public Briefing - Richland Operations Office May 2013 Draft Pre-Decisional Information 2 "Complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development, production, and Government-sponsored nuclear energy research" EM

  6. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  7. Independent Activity Report, Richland Operations Office- June 2011

    Broader source: Energy.gov [DOE]

    Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration [HIAR-RL-2011-06-22

  8. Groundwater Update K. Michael Thompson Soil and Groundwater Division Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update Jon Peschong Richland Operations Office May 2015 2 billion gallons of contaminated groundwater treated tons of contaminants removed in all pump and treat systems since the facilities began operating 12 171 HANFORD SITE GROUNDWATER NUMBERS billion of gallons of groundwater treated in 2014 1.95 tons of contaminants removed in 2014 62 3 Groundwater Key Focus Areas * Expand pump and treat systems - Continue pump and treat operations - Install and connect new and existing wells to maximize

  9. EM Richland Operations Office Manager Reflects on River Corridor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the F Reactor Area during plutonium production operations, and the larger image shows an ... Office (RL), responsible for management and oversight of cleanup of the ...

  10. DOE Announces Additional Tour Seats Available: Tours of B Reactor at the Hanford Site Begin and End in Richland, Wash.

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The U.S. Department of Energy (DOE) has made additional seats available for tours of the B Reactor National Historic Landmark this July and August.

  11. Independent Activity Report, Richland Operations Office - April 2013 |

    Office of Environmental Management (EM)

    Department of Energy April 2011 Independent Activity Report, Nevada National Security Site - April 2011 April 2011 Nevada National Security Site Operational Readiness Review for the Joint Actinide Shock Physics Experimental Research Facility Restart Pre-visit [HIAR-NNSS-2011-04-28] This Independent Activity Report documents an oversight activity conducted by Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations April 25-28, 2011, at the Nevada

  12. DOE, City of Richland and Benton PUD Increase Fiber Optic Telecommunication Capacity in Benton County- Upgrade improves communications at Hanford Site, schools and libraries

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. ― The Department of Energy (DOE), city of Richland, and Benton County’s Public Utility District (Benton PUD) jointly implemented a high-capacity fiber optic cable in Richland and at the Hanford Site. The project will improve communications throughout the area.

  13. Technical Qualification Program Self-Assessment Report - Richland...

    Office of Environmental Management (EM)

    Richland Operations Office - 2014 Technical Qualification Program Self-Assessment Report - Richland Operations Office - 2014 The Richland Operations Office (RL) Technical ...

  14. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  15. Richland Operations Office Completes Cleanup in Hanford’s 300 Area North Section

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM met a Tri-Party Agreement milestone by completing cleanup of the north portion of Hanford’s 300 Area.

  16. DOE Recognizes EM Richland Operations Office Employees for Excellence...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... construction with Waste Treatment and Immobilization Project Assistant Manager Bill Hamel, left; EM Acting Assistant Secretary Mark Whitney, second from left; and EM Waste ...

  17. Media Contact: Mark Heeter, DOE Richland Operations Office,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project locations created during World War II for the top- secret mission to beat the ... Japan, to help bring an end to the war in the Pacific, with Japan surrendering on ...

  18. DOE Issues Request for Information for Richland Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract(s) Acquisition Planning October 15, 2015 - 2:00pm ... specialized capabilities necessary to successfully perform ... the environmental cleanup projects and Hanford Site ...

  19. 2014 Annual Workforce Analysis and Staffing Plan Report - Richland...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Annual Workforce Analysis and Staffing Plan Report - Richland Operations Office 2014 Annual Workforce Analysis and Staffing Plan Report - Richland Operations Office Managers ...

  20. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-08

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Supersedes DOE O 210.2.

  1. EIS-0063: Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the existing tank design and consider additional specific design and safety feature alternatives for the thirteen tanks being constructed for storage of defense high-level radioactive liquid waste at the Hanford Site in Richland, Washington. This statement supplements ERDA-1538, "Final Environmental Statement on Waste Management Operation."

  2. Evaluation of P-101 course ``Orientation to Occupational Safety Compliance in DOE`` taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect (OSTI)

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, ``Orientation to Occupational Safety in DOE``, (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments.

  3. Evaluation of P-101 course Orientation to Occupational Safety Compliance in DOE'' taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect (OSTI)

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, Orientation to Occupational Safety in DOE'', (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments.

  4. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  5. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau

    Office of Environmental Management (EM)

    Page 1 of 10 Reporting Period: Fiscal Years (FY) 2012 - 2016 FY 2015 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability. Annual     2. Publish Post Competition Accountability Report on the LM internet. Quarterly     3. Conduct independent evaluations of key programs, projects, or technical

  6. 2013 Annual Workforce Analysis and Staffing Plan Report- Richland Operations Office

    Broader source: Energy.gov [DOE]

    Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

  7. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-12

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  8. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. ... Worldwide, fewer than 5 percent of research labs in the LEED registry are ...

  9. PIA - Richland Occupational Medicine Contract | Department of...

    Energy Savers [EERE]

    PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PDF icon PIA - Richland Occupational...

  10. Technical Qualification Program Self-Assessment Report - Richland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office - 2014 | Department of Energy Richland Operations Office - 2014 Technical Qualification Program Self-Assessment Report - Richland Operations Office - 2014 The Richland Operations Office (RL) Technical Qualification Program Plan establishes a process to objectively determine that individuals performing activities related to the technical support, management, oversight, or operation possess the necessary knowledge, skills, and abilities to perform their assigned duties and

  11. EA-1562: Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the potential environmental impacts of DOE proposed activities associated with constructing and operating a new Physical Sciences Facility (PSF) complex on DOE property located in...

  12. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  13. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... liquid waste collection system and will later be pumped ... 20 support facilities and 100 systems across the ... three switchgear buildings and two diesel generator facilities. ...

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    unique in that it was issued by RL in 1996, and has been maintained and interpreted by a Focus Group with invited membership by technical experts from the Office of River...

  16. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17, 2012 CERTIFIED MAIL Mr. Kevin Newcomb (home address has been deleted) Dear Mr. Newcomb: FREEDOM OF INFORMATION ACT REQUEST (FOI 2012-00537) You requested, pursuant to the Freedom of Information Act (FOIA), a copy of Problem Evaluation Requests (PER) 2004-4005, 2003-1780 and the current Tank Vapor Information Sheets from Washington River Protection Solutions (WRPS). Your request is granted and the documents are enclosed. On the first page of PER-2004-4005 we made certain deletions pursuant to

  17. Richland Operations Office's Fiscal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (fiscal year 2014) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 9,815,000 Award Fee Earned: 9,659,555 Award Fee Area Adjectival ...

  18. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of ... Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) for FY 2015 Award ...

  19. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Focus Group determines a change or interpretation to the HASQARD is de minimis (an editorial change or interpretation clarifying but not modifying a requirement - example...

  20. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -M-24 GROUNDWATER WELL-DRILLING CHANGE PACKAGE Dear Mr. Martin: This letter is in response to HAB's advice 152 regarding the M-24 groWldwaterwell-drilling Tri- party Agreement ...

  1. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... due to multiple shut downs of the work for re- planning. ... While this process is more of anl emergency response, and ... re-plan work. 0 Continued problems in the chop shop revealed ...

  2. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... General Storage, 1987 and 1990 editions; NFPA 30, Flammable and Combustible Liquids Code, 1993 edition; and, NFPA 23 1 C, Standard for Rack Storage of Materials, 1991 edition. Code ...

  3. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31, 2016 DOE-ID Operations Summary For the Period April 1-April 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  4. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2016 DOE-ID Operations Summary For the Period March 1-March 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  5. DOE News Release Media Contact: For Immediate Release:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mark Heeter, DOE December 31, 2014 (509) 373-1970, Mark.Heeter@rl.doe.gov DOE Richland Operations Office and its contractors look back at 2014 cleanup progress RICHLAND, Wash. - Workers with the U.S. Department of Energy's (DOE) Richland Operations Office and its contractors made significant progress this year in the cleanup of the Hanford Site that helped protect employees, the public, the environment, and the Columbia River, which runs through the Hanford Site in southeast Washington state.

  6. Report on follow-up inspection of the double funding of security for special nuclear material at the Richland Operations Office

    SciTech Connect (OSTI)

    1995-08-28

    In a June 3, 1993, Office of Inspections Letter Report, the Office of Inspector General notified the Department`s Acting Chief Financial Officer that the Department had requested and received $60 million, double the funds needed, for the safeguard and security of special nuclear material at the Department`s Richland Operations Office in Fiscal Year 1993. In response to the Letter Report, in a June 28, 1993, memorandum, the Acting Chief Financial Officer advised the Office of Inspector General that the extra $30 million received by the Office of Environmental Management would either be: (1) applied to unanticipated requirements in Fiscal Year 1993; (2) applied to the anticipated Congressional reduction to the Department`s Fiscal Year 1994 budget request; or (3) used as an offset to the Fiscal Year 1995 budget request. The purpose of this follow-up inspection was to review the circumstances surrounding the Fiscal Year 1993 double funding for the security of special nuclear material at Richland. The principal objectives of this inspection were to: (1) identify contributing factors to the double funding and corrective actions needed to prevent the double funding from reoccurring; and (2) review Departmental Managers` response to the double funding issue.

  7. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  8. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    SciTech Connect (OSTI)

    1993-11-01

    The hub of today`s programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE`s Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed.

  9. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  10. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  11. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  12. PIA - Richland Personal Security Clearance Record | Department...

    Energy Savers [EERE]

    Personal Security Clearance Record PIA - Richland Personal Security Clearance Record PIA - Richland Personal Security Clearance Record PIA - Richland Personal Security Clearance ...

  13. DOE Awards Management and Operating Contract for DOE's Strategic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Petroleum Reserve | Department of Energy Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18, 2013 - 5:11pm Addthis WASHINGON, D. C. - After conducting a rigorous competitive selection process, the U.S. Department of Energy (DOE) today announced that Fluor Federal Petroleum Operations, LLC (team includes members comprised of Parent Company Fluor Federal Services, Inc., of

  14. Richland/Office of River Protection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland/Office of River Protection Richland/Office of River Protection Below are compliance agreements and accompanying summaries for the Richland Operations Office and Office of River Protection at the Hanford site. Settlement Agreement re: Washington v. Bodman, January 6, 2006 (49.77 KB) Administrative Order, June 13, 2000 (1.61 MB) Administrative Order, June 13, 2000 Summary (40.7 KB) Federal Facility Compliance Agreement on Storage of Polychlorinated Biphenyls, August 8, 1996 (224.55 KB)

  15. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  16. Richland Operations Office's Fiscal Year...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (fiscal year 2015) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 10,899,475 Award Fee Earned: 10,591,975 Award Fee Area ...

  17. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (RL), the main field office for the Hanford Site in southeastern Washington State. I hope these pages will be informative for you about our mission, goals, and progress toward...

  18. DOE Awards Management and Operating Contract for DOE's Waste Isolation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Plant | Department of Energy Management and Operating Contract for DOE's Waste Isolation Pilot Plant DOE Awards Management and Operating Contract for DOE's Waste Isolation Pilot Plant April 20, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Environmental Management Consolidated Business Center (803) 952-8564 Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) announced today that Nuclear Waste Partnership LLC (members comprised

  19. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) No ... There are no adverse impact to the facility or public safety as a result of the ...

  20. 2014 Annual Workforce Analysis and Staffing Plan Report - Richland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Richland Operations Office 2014 Annual Workforce Analysis and Staffing Plan Report - Richland Operations Office Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process continues to cover technical capability needs to address defense nuclear facility and related

  1. Microsoft Word - DOE EA 1660 07-21-09_FINAL.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2009 DOE/EA-1660F Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Final Environmental Assessment July 2009 Sum-1 Summary Introduction. This Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy (DOE) activities associated with

  2. Microsoft Word - DOE EA 1660 07-21-09_FINAL.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 2009 DOE/EA-1660F Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Final Environmental Assessment July 2009 Sum-1 Summary Introduction. This Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy (DOE) activities associated with

  3. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  4. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Notable ... system at the Fuel Conditioning Facility, operations discovered a blown ...

  5. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... operators at the Materials and Fuels Complex (MFC) discovered a potential suspectcounterfeit bolt on the handle of a chain fall during a preventative maintenance inspection. ...

  6. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  7. Voluntary Protection Program Onsite Review, Fluor Federal Services Richland, Washington- June 2008

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Fluor Federal Services in Richland, Washington is continuing to perform at a level deserving DOE-VPP Star recognition.

  8. DOE Issues Request for Proposals for Hanford Site Occupational Medical Services

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The Department of Energy (DOE) today issued a Request for Proposals (RFP) for an Occupational Medical Services contract at the Hanford Site. The solicitation is for a small-business contractor to perform occupational medical services for the DOE Richland Operations Office and Office of River Protection.

  9. Microsoft Word - DOE-EA-1707D_Revised_Predecisional_EA Closure_NRDWL-SWL08232011.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7D REVISED PREDECISIONAL DRAFT AUGUST 2011 Environmental Assessment Closure of Nonradioactive Dangerous Waste Landfill (NRDWL) and Solid Waste Landfill (SWL), Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 DOE/EA-1707D REVISED PREDECISIONAL DRAFT AUGUST 2011 DOE/EA-1707D REVISED PREDECISIONAL DRAFT iii AUGUST 2011 Contents 1 1 Introduction and Purpose and Need

  10. Richland Energy Services - Residential Energy Efficiency Rebate...

    Broader source: Energy.gov (indexed) [DOE]

    Program Info Sector Name Utility Administrator City of Richland Website http:www.ci.richland.wa.usindex.aspx?nid174 State Washington Program Type Rebate Program Rebate...

  11. Town of Richland | Open Energy Information

    Open Energy Info (EERE)

    Town of Richland Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Sustainable Energy Development Energy Purchaser Town of Richland Location...

  12. DOE-RL FOIA/PA Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/03 FRI 10:02 FAX 1 509 376 9704 DOE-RL FOIA/PA Office [41002 .,UU".. ...,. '.1..1 Department of Energy .Rlchland Operations Office P.O. Box 550 Richland, Washington 993.52 APR. 4 2fJOa ( 03~PRO.O389 Mr. D. B. Van Leuven, President and Chief Executive Officer Fluor Hanford, Inc. Richland, Washington 993~2 DearMr; Van Leuven: CONTRACT NO. DB-ACO6-96RL13200 -REDUCTION IN LONG-TERM LIABll..ITIES The U.S. Department of Energy (DOE), Richland Operations Office (RL). is C1UTCntly reviewing the

  13. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky

    Office of Environmental Management (EM)

    EA for Conveyance of Land at the Hanford Site, Richland, WA Page 1 of 6 September 2015 DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE, RICHLAND, WASHINGTON AGENCY: U.S. Department of Energy Richland Operations Office ACTION: Mitigation Action Plan SUMMARY: This Mitigation Action Plan (MAP) is an integral part of the Finding of No Significant Impact (FONSI) for the United States Department of Energy's (DOE) Environmental Assessment for Proposed Conveyance of

  14. National Nuclear Security Administration Official Tours Cleanup Operations for Navy

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Adm. James F. Caldwell Jr., director of the DOE National Nuclear Security Administration’s Naval Nuclear Propulsion Program, recently toured the Hanford Site cleanup activities managed by EM’s Richland Operations Office (RL). RL Manager Stacy Charboneau welcomed Caldwell to the site.

  15. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  16. Operating Experience Level 3, DOE Occupational Radiation Exposures...

    Energy Savers [EERE]

    DOE Occupational Radiation Exposures for 2013 Operating Experience Level 3, DOE Occupational Radiation Exposures for 2013 January 29, 2015 OE-3 2015-01: DOE Occupational Radiation...

  17. Richland Analytical Building Blocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    appropriate and compliant Safeguards and Security programs for the Hanford site. ... operations necessary to support safe and compliant interim storage of Spent Nuclear Fuel (SNF). ...

  18. Richland Analytical Building Blocks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 $ in Thousands Draft Pre-Decisional PBS ABB Title FY 2015 FY 2015 FY 2015 Description (Range $000) Cumulative Range RL-0030 Groundwater Monitoring (GWM), integration & Assessment, and Operations & Maintenance 100,000 - 120,000 100,000 - 120,000 Accomplishes continued integration of Site-wide groundwater and vadose zone cleanup activities, groundwater contamination monitoring, as well as operations, maintenance, and necessary modifications of existing remediation systems. RL-0041 River

  19. 2012 Annual Planning Summary for Richland Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Richland Office.

  20. DOE?s Idaho Operations Office Issues 2011-Beyond Strategic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    support DOE's missions in energy, science and national security, through excellence in management. The DOE-ID Strategic Plan sets out objectives for ID and its contractors that...

  1. Environmental Protection, Safety, and Health Protection Program for DOE Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-08-13

    This Order establishes the Environmental Protection, Safety. and Health Protection Program for Department of Energy (DOE) operations. Cancels DOE 5480.1, dated 5-5-1980, its chapters are not canceled. Canceled by DOE O 5480.1B

  2. DOE to Compete Contract for Management and Operation of Pacific...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Compete Contract for Management and Operation of Pacific Northwest National Laboratory DOE to Compete Contract for Management and Operation of Pacific Northwest National ...

  3. DOE Extends Contract to Operate Depleted Uranium Hexafluoride...

    Energy Savers [EERE]

    Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants December 24, 2015 - ...

  4. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement

    Office of Environmental Management (EM)

    Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2013 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal using external

  5. DOE - NNSA/NFO -- Operation Clean Desert

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ZONE > Operation Clean Desert NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Operation Clean Desert FUN FOR ALL AGES Dr. Proton Graphic Adam - Smiling Operation ...

  6. Program desk manual for occupational safety and health -- U.S. Department of Energy Richland Operations, Office of Environment Safety and Health

    SciTech Connect (OSTI)

    Musen, L.G.

    1998-08-27

    The format of this manual is designed to make this valuable information easily accessible to the user as well as enjoyable to read. Each chapter contains common information such as Purpose, Scope, Policy and References, as well as information unique to the topic at hand. This manual can also be provided on a CD or Hanford Internet. Major topics include: Organization and program for operational safety; Occupational medicine; Construction and demolition; Material handling and storage; Hoisting and rigging; Explosives; Chemical hazards; Gas cylinders; Electrical; Boiler and pressure vessels; Industrial fire protection; Industrial hygiene; and Safety inspection checklist.

  7. Richland Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Coop Place: Wisconsin Phone Number: (608) 647-3173 Website: www.richec.comindex.html Facebook: https:www.facebook.compagesRichland-Electric-Cooperative156038837800606...

  8. DOE/RL-2011-27

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    27 Revision 0 Hanford Site Air Operating Permit 2011 Renewal Application Operating Summary Covering the Period January 1, 2007 Through December 31, 2010 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management U . S . DEPARTMENT OF Richland Operations Office ENERGY P.O. Box 550 Richland, Washington 99352 ~mved ~or Dubli' ~ease; Fw1he1 D~~nat1on Jntimited DOE/RL-2011-27 Revision 0 Hanford Site Air Operating Permit 2011 Renewal Application Operating Summary

  9. DOE Climate Change Adaptation Training (Richland, WA)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This free training is a primer on climate science, identifying climate hazards, conducting vulnerability assessments, leveraging climate change data and tools and understanding the energy-water-food nexus.

  10. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice37.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy - Richland Operations PO Box 550 (A7-50) Richland, WA 99352 December 8, 1995 Subject: Formation of an Openness Panel (HAB Advice #37) Dear Mr. Wagoner: During the Hanford Summit II sessions in 1994, Secretary Hazel OLeary endorsed the formation of an Openness Panel as a strategy for furthering communication, public participation, whistle blower protection and general understanding by the public and stakeholders of DOE plans and programs. It is recommended that the DOE work immediately

  11. Microsoft Word - 2010O-01_DOE Response to Beryllium.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Response to DOE's Response to Beryllium Advice 2010O-01 February 5, 2010 Page 1 February 5, 2010 David Brockman, Manager U.S. Department of Energy, Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 Shirley Olinger, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Re: DOE's Response to HAB Beryllium Advice #217 and #218 Dear Mr. Brockman and Ms. Olinger, On April 3, 2009 the Hanford Advisory Board (Board) provided two pieces of

  12. Microsoft Word - 140602DOE-ID_OperationsSummary.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2014 DOE-ID Operations Summary For the Period April 8, 2014 through May 15, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  13. DOE Community Transition Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Us » Contact Us » DOE Community Transition Contacts DOE Community Transition Contacts Headquarters Tom Pauling, Acting Director Office of Legacy Management, LM-1 U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 (202) 586-1782 (202) 586-8403 (FAX) thomas.pauling@hq.doe.gov Field HANFORD Colleen French U.S. Department of Energy Richland Operations Office P.O. Box 550 A7-75 Richland, WA 99352 (509) 373-5985 (509) 373-1563 (FAX) colleen_c_french@rl.gov IDAHO NATIONAL

  14. DOE Awards Management and Operating Contract for DOE's Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arlington, Virginia and major subcontractors MRIGlobal of Kansas City, Missouri; Booz Allen Hamilton of Mclean, Virginia; and ASRC Petroleum Operations and Maintenance of ...

  15. DOE Selects ASE to Manage and Operate its National Renewable...

    Office of Environmental Management (EM)

    ASE to Manage and Operate its National Renewable Energy Laboratory DOE Selects ASE to Manage and Operate its National Renewable Energy Laboratory July 29, 2008 - 2:40pm Addthis ...

  16. EA-1915: Proposed Conveyance of Land at the Hanford Site, Richland,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington | Department of Energy 15: Proposed Conveyance of Land at the Hanford Site, Richland, Washington EA-1915: Proposed Conveyance of Land at the Hanford Site, Richland, Washington Summary The EA assesses the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to the local economic development organization, the Tri-City Development Council (TRIDEC), a DOE-recognized Community Reuse Organization. TRIDEC has requested the transfer of land located

  17. Hanford Identification (HID) PIA, Richland Operations Office...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  18. Richland Operations Office's Fiscal Year 2013...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evaluation and Measurement Plan (PEMP) Award Fee Available: 14,092,235 ... upon completion of demolition of the plant to "Slab on Grade," consistent with the PEMP

  19. Protection Program Operations - DOE Directives, Delegations,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.3, Protection Program Operations by jcronin Functional areas: Physical Protection, Protective Force, Safeguards, Security, and Emergency Management The Order establishes...

  20. Annual Energy Consumption Analysis Report for Richland Middle School

    SciTech Connect (OSTI)

    Liu, Bing

    2003-12-18

    Richland Middle School is a single story, 90,000 square feet new school located in Richland, WA. The design team proposed four HVAC system options to serve the building. The proposed HVAC systems are listed as following: (1) 4-pipe fan coil units served by electrical chiller and gas-fired boilers, (2) Ground-source closed water loop heat pumps with water loop heat pumps with boiler and cooling tower, and (3) VAV system served by electrical chiller and gas-fired boiler. This analysis estimates the annual energy consumptions and costs of each system option, in order to provide the design team with a reasonable basis for determining which system is most life-cycle cost effective. eQuest (version 3.37), a computer-based energy simulation program that uses the DOE-2 simulation engine, was used to estimate the annual energy costs.

  1. DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plants | Department of Energy Contract to Operate Depleted Uranium Hexafluoride Conversion Plants DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants December 24, 2015 - 10:00am Addthis Media Contact Brad Mitzelfelt, 859-219-4035 brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for Operations of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities

  2. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances December 20, 2005 - 11:44am Addthis DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide

  3. DOE Selects Washington River Protection Solutions, LLC for Tank Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract at Hanford Site | Department of Energy Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site DOE Selects Washington River Protection Solutions, LLC for Tank Operations Contract at Hanford Site May 29, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Washington River Protection Solutions (WRPS), LLC has been selected as the tank operations contractor to store, retrieve and treat Hanford tank waste and

  4. Columbia River monitoring: Distribution of tritium in Columbia River water at the Richland Pumphouse

    SciTech Connect (OSTI)

    Dirkes, R.L.

    1993-02-01

    The Surface Environmental Surveillance Project (SESP) is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This report presents the results of a special study conducted as part of the SESP to supplement the routine Columbia River monitoring program and provide information relative to the dispersion and distribution of Hanford origin contaminants entering the river through the seepage of ground water along the Hanford Site. Sampling was conducted along cross sections to determine the distribution of tritium within the Columbia River at Richland, Washington. The investigation was also designed to evaluate the relationship between the average tritium concentrations in the river water at this location and in water collected from the routine SESP river monitoring system located at the city of Richland drinking water intake (Richland Pumphouse). This study was conducted during the summers of 1987 and 1988. Water samples were collected along cross sections located at or near the Richland Pumphouse monitoring station.

  5. DOE - NNSA/NFO -- Photo Library OPERATION DOORSTEP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operation Doorstep NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Operation Doorstep Operation Doorstep and Operation Cue. This video shows Federal Civil Defense Administration film footage. In the Operation Doorstep portion, footage shows blast and thermal effects on mannequins, automobiles, and wooden frame houses. [ Full Text ] Instructions: Click the photograph THUMBNAIL to view the photograph details Click the Category, Number, or Date table header links to

  6. Richland, Washington: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Richland is a city in Benton County, Washington. It falls under Washington's 4th congressional...

  7. DOE Names Interim Manager for Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy NNSA Site Facility Management Contracts - June 2016 DOE NNSA Site Facility Management Contracts - June 2016 DOE NNSA Site Facility Management Contracts - June 2016.pdf (58.05 KB) More Documents & Publications DOEfacilitymgt_contractsownership_01052011.pdf Chapter 1 - Acquisition Regulations System Class Patent Waiver W(C)2008-001

    DOE Names Interim Manager for Idaho Operations Office Dennis Miotla, the Office of Nuclear Energy's Deputy Assistant Secretary Dennis Miotla for

  8. Labor Standards for DOE Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Flash is issued to provide you an Acquisition Letter containing information and guidance regarding application of labor standards at the Department of Energy (DOE) and National Nuclear Security Administration (NNSA) management and operating (M&O) contract facilities.

  9. Operating Experience Level 3, DOE Occupational Radiation Exposures for 2013

    Broader source: Energy.gov [DOE]

    This Operating Experience Level 3 (OE-3) document provides an overview summary of radiation doses from occupational exposures at the Department of Energy (DOE), including the National Nuclear Security Administration for the year 2013.

  10. Environmental Protection, Safety, and Health Protection Program for DOE Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1980-05-05

    This order establishes the Environmental Protection, Safety, and Health Protection Program for Department of Energy (DOE) operations. Cancels Interim Management Directive No. 5001, Safety, Health And Environmental Protection dated 9-29-77.

  11. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice97.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mr. Keith Klein, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Subject: FY2000 Performance Agreements Dear Mr. Klein: The Hanford Advisory Board (HAB) urges the U.S. Department of Energy (DOE) to use performance agreements to accomplish cleanup in the most technically sound, environmentally safe, and cost efficient manner possible. In 1998, the Hanford Advisory Board provided specific advice on Project Hanford Management Contract (PHMC)

  12. EA-1203: Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to widen and operate the unused Trench 33 in the 218-W-5 Low-Level Burial Ground at the U.S. Department of Energy's Richland Operations...

  13. DOE To Compete Los Alamos National Laboratory Management and Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Upon Completion of Current University of California Contract in 2005 | National Nuclear Security Administration | (NNSA) DOE To Compete Los Alamos National Laboratory Management and Operations Contract Upon Completion of Current University of California Contract in 2005 April 30, 2003 DOE To Compete Los Alamos National Laboratory Management and Operations Contract Upon Completion of Current University of California Contract in 2005 (PDF - 0.01Mb)~

  14. VOLUNTARY PROTECTION PROGRAM ONSITE REVIEW, Fluor Federal Services Richland, Washington February 26- March 2, 2001

    Broader source: Energy.gov [DOE]

    This report summarizes the results of the HSS DOE-VPP Team’s evaluation of Fluor Federal Services Richland, Washington during the period of February 26 - March 2, 2001, and provides the Chief Health, Safety and Security Officer with the necessary information to make the final decision regarding the company’s continued participation in DOE-VPP as a Star site.

  15. DOE Idaho Operations Office Manager Elizabeth Sellers leaving Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Idaho Operations Office Manager Elizabeth Sellers leaving Department Elizabeth Sellers, manager of the U.S. Department of Energy�s Idaho Operations Office, announced today that she will retire from United States government service in February. Elizabeth Sellers, manager of the U.S. Department of Energy�s Idaho Operations Office �I have thoroughly enjoyed my time in Idaho, and my 26 years serving the United States Department of Energy,� said Sellers, who has served the DOE since 1983.

  16. EM Wins Awards for Taking Big Steps to Reduce DOE's Electronics...

    Energy Savers [EERE]

    East Tennessee Technology Park Platinum Level Award - Oak Ridge, Tennessee Richland Operations Office Gold Level Award - Richland, Washington Paducah Site Silver Level Award - ...

  17. DOE - NNSA/NFO -- Photo Library OPERATION TEAPOT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operation Teapot NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Operation Teapot Operation Teapot consisted of 14 nuclear tests. The goal of the series was to test nuclear devices for possible inclusion in the nuclear weapons stockpile; improve military tactics, equipment and training; and study civil defense requirements. [ Full Text ] Instructions: Click the photograph THUMBNAIL to view the photograph details Click the Category, Number, or Date table header links

  18. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest

  19. EIS-0189: Tank Waste Remediation System (TWRS), Richland, WA (Programmatic)

    Broader source: Energy.gov [DOE]

    This environmental impact statement evaluates the Department of Energy (DOE)'s, in cooperation with the Washington State Department of Ecology (Ecology), decisions on how to properly manage and dispose of Hanford Site tank waste and encapsulated cesium and strontium to reduce existing and potential future risk to the public, Site workers, and the environment. The waste includes radioactive, hazardous, and mixed waste currently stored in 177 underground storage tanks, approximately 60 other smaller active and inactive miscellaneous underground storage tanks (MUSTs), and additional Site waste likely to be added to the tank waste, which is part of the tank farm system. In addition, DOE proposes to manage and dispose of approximately 1,930 cesium and strontium capsules that are by-products of tank waste. The tank waste and capsules are located in the 200 Areas of the Hanford Site near Richland, Washington.

  20. DOE - NNSA/NFO -- Photo Library OPERATION IVY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operation Ivy NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Operation Ivy Operation Ivy, Parts 1 and 2 - "The island of Elugelab is missing!" President Eisenhower heard this short report on the Mike shot in Operation Ivy from Gordon Dean, Chairman of the Atomic Energy Commission. Mike was the first full-fledged hydrogen bomb to be tested. [ Full Text ] Instructions: Click the photograph THUMBNAIL to view the photograph details Click the Category, Number,

  1. DOE Names New Director of Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Names New Director of Idaho Operations Office Idaho Falls, ID - The Department of Energy today announced that Rick Provencher has been named manager of its Rick Provencher Idaho Operations Office, which oversees the nation's leading commercial nuclear energy research laboratory and environmental cleanup and waste management mission at the site. Provencher, who has managed the highly-successful Idaho Cleanup Project since 2004, will assume his new duties on May 23, 2010. He succeeds interim

  2. DOE Idaho Operations Office's STEM Partnership with Elementary School

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grows | Department of Energy Idaho Operations Office's STEM Partnership with Elementary School Grows DOE Idaho Operations Office's STEM Partnership with Elementary School Grows August 31, 2015 - 12:15pm Addthis Students explore the inside of Idaho National Laboratory’s Computer Assisted Virtual Environment. Students explore the inside of Idaho National Laboratory's Computer Assisted Virtual Environment. Students learn about the Idaho National Laboratory’s bus simulator. The INL bus

  3. Microsoft Word - DOE_EA-1454.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    54 Rev. 0 Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F, 100-H, and 100-N Areas U.S. Department of Energy Richland Operations Office Richland, Washington 99352 March 2003 DOE/EA-1454 Rev. 0 EA for Reactivation and Use of Three Former Borrow Sites in the 100-F, 100-H, and 100-N Areas March 2003 i TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR AGENCY ACTION ................................................... 1-1 2.0 BACKGROUND

  4. City of Richland, Washington (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Name: City of Richland Place: Washington Phone Number: (509) 942-7421 Website: www.ci.richland.wa.usindex.as Outage Hotline: After Hours and Weekends: (509) 943-4428...

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    X-1 APPENDIX X SUPPLEMENT ANALYSIS OF THE DRAFT TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON Consistent with U.S. Department of Energy (DOE) Regulations (10 CFR 1021.314(c)(3)), "DOE shall make the determination and the related Supplement Analysis available to the public for information. Copies of the determination and Supplement Analysis shall be provided upon written request. DOE shall make copies available for inspection in

  6. DOE's EM program continues environmental education grant | Department of

    Energy Savers [EERE]

    National Laboratory | Department of Energy to Compete Contract for Management and Operation of Pacific Northwest National Laboratory DOE to Compete Contract for Management and Operation of Pacific Northwest National Laboratory February 16, 2006 - 11:55am Addthis WASHINGTON, D.C. -- The U.S. Department of Energy (DOE) announced today that it intends to seek competitive bids for the management and operations contract for the Pacific Northwest National Laboratory (PNNL), Richland, Washington.

  7. Richland County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Cazenovia, Wisconsin Henrietta, Wisconsin Ithaca, Wisconsin Lone Rock, Wisconsin Orion, Wisconsin Richland Center, Wisconsin Richwood, Wisconsin Rockbridge, Wisconsin...

  8. EIS-0364: Decommissioning of the Fast Flux Test Facility, Hanford Site, Richland, WA

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA), on proposed decommissioning of the Fast Flux Test Facility (FFTF) at the Hanford Site, Richland, Washington.

  9. DOE/EIS-0222-SA-O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement U.S. Department of Energy Richland Operations Office Richland, Washington 99352 June 2008 DOE/EIS-0222-SA-0 1 SUMMARY In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least

  10. PIA - Richland Occupational Medicine Contract | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract PIA - Richland Occupational Medicine Contract (60.05 KB) More Documents & Publications Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  11. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Richland Operations Office June 2012 2 2012 HAB Membership Package * HAB Membership package is under review at DOE-HQ - 16 members and 22 alternatives are up for reappointment or appointment (8 new appointments) * Appointment letters will not be issued by June 8, 2012 - DOE is seeking approval for limited travel reimbursement to support July committee meetings. 3 Membership Diversity (November 2011 HAB Meeting) * DOE policy calls for ethnic and gender diversity in Environmental Management

  12. DOE Awards 265 Million Hours of Supercomputing Time to Advance...

    Energy Savers [EERE]

    ... TN, DOE's Pacific Northwest National Laboratory in Richland, WA, DOE's Princeton Plasma Physics Laboratory in Princeton, NJ; DOE's Sandia National Laboratories in ...

  13. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice70.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D.C. 20585 John Wagoner, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Subject: FY 1999 DOE-RL Budget Dear Messrs. Alm and Wagoner: Major Themes in Review of Draft FY 1999 Budget (Advice to DOE Headquarters is highlighted in italics throughout the advice.) There are a number of overall themes that the Hanford Advisory Board wants to stress in regard to the DOE-RL FY 1999 budget, which are described in more detail in our advice below: l Budgeting

  14. DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    85 CHAPTER 4 IMPLEMENTATION GUIDANCE FOR MATERIAL CONDITION AND AGING MANAGEMENT This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. As shown in Figure 4-1, Material Condition and Aging Management (MCA) activities are developed and implemented in three distinct phases: a preliminary phase, a detailed or main phase, and an

  15. FY 2007 Operating Plan for DOE--March 16, 2007.xls | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2007 Operating Plan for DOE--March 16, 2007.xls U.S Department of Energy 2007 operating plan by appropriation. PDF icon FY 2007 Operating Plan for DOE--March 16, 2007.xls More ...

  16. FY 2007 Operating Plan for DOE--March 16, 2007 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2007 Operating Plan for DOE--March 16, 2007 This is a spreadsheet for the FY 2007 Operating Plan by Appropriation. PDF icon FY 2007 Operating Plan for DOE--March 16, 2007 More ...

  17. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume 3, Book 1 Section 1: Overview Section 2: Topics of Interest Section 3: Individual Commentors U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County,

  18. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    SciTech Connect (OSTI)

    Gerton, R.E.

    1997-07-25

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board`s investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63).

  19. EA-1860: Richland Renewable Energy Waste-to-Energy Project, Richland, Wisconsin

    Broader source: Energy.gov [DOE]

    DOE is preparing a draft Environmental Assessment to analyze the potential environmental impacts of the proposed construction and operation of a new wastewater treatment facility and the alternative of not implementing this project.

  20. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    SciTech Connect (OSTI)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  1. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice87.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    John Wagoner, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Subject: FY99 Performance Agreements Dear Mr. Wagoner: The Hanford Advisory Board has provided extensive advice (33, 55, 59, 62, 77, 84) on the performance agreements between DOE and the Project Hanford Management Contract (PHMC). At the request of DOE in its letter dated June 17, the Hanford Advisory Board has prepared advice for the development of the FY99 performance agreements. The

  2. Microsoft Word - 2010O-03 DOE-RL Manager.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-RL Manager Recommendations 2010O-03 Adopted June 4, 2010 Page 1 June 4, 2010 Inés Triay Assistant Secretary for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Re: Department of Energy Richland Operations Manager Recommendations Dear Ms Triay, Thank you for encouraging the Hanford Advisory Board (Board) and me to provide recommendations regarding the selection of the next U.S. Department of Energy (DOE) Richland

  3. Categorical Exclusion Determinations: Office of River Protection-Richland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opperations Office | Department of Energy River Protection-Richland Opperations Office Categorical Exclusion Determinations: Office of River Protection-Richland Opperations Office Categorical Exclusion Determinations issued by Office of River Protection-Richland Office. DOCUMENTS AVAILABLE FOR DOWNLOAD December 31, 2015 CX-014441: Categorical Exclusion Determination MSA Annual Categorical Exclusion for Repair or Replacement of Pipelines CX(s) Applied: B5.4 Date: 12/31/2015 Location(s):

  4. Richland County, South Carolina: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    LLC PFCT South Carolina Hydrogen and Fuel Cell Alliance US National Institute of Hydrogen Fuel Cell Commercialization Places in Richland County, South Carolina Arcadia...

  5. December 15-16, 2015 - Technical Exchange Meeting - Richland...

    Broader source: Energy.gov (indexed) [DOE]

    Technical Exchange Meeting, December 15 and 16, 2015, Washington State Department of Ecology Offices, Richland, WA. Theme: Interpretation of Performance and Risk Assessment...

  6. Richland County, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Braintree Business Development Center Places in Richland County, Ohio Bellville, Ohio Butler, Ohio Crestline, Ohio Galion, Ohio Lexington, Ohio Lucas, Ohio Mansfield, Ohio...

  7. City of Richland Center, Wisconsin (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Website: cityutilitiesofrc.com Facebook: https:www.facebook.compagesCity-of-Richland-Center120964331250544 Outage Hotline: (608) 647-3844 References: EIA Form EIA-861 Final...

  8. DOE Field Operations Program EV and HEV Testing

    SciTech Connect (OSTI)

    Francfort, James Edward; Slezak, L. A.

    2001-10-01

    The United States Department of Energy’s (DOE) Field Operations Program tests advanced technology vehicles (ATVs) and disseminates the testing results to provide fleet managers and other potential ATV users with accurate and unbiased information on vehicle performance. The ATVs (including electric, hybrid, and other alternative fuel vehicles) are tested using one or more methods - Baseline Performance Testing (EVAmerica and Pomona Loop), Accelerated Reliability Testing, and Fleet Testing. The Program (http://ev.inel.gov/sop) and its nine industry testing partners have tested over 30 full-size electric vehicle (EV) models and they have accumulated over 4 million miles of EV testing experience since 1994. In conjunction with several original equipment manufacturers, the Program has developed testing procedures for the new classes of hybrid, urban, and neighborhood EVs. The testing of these vehicles started during 2001. The EVS 18 presentation will include (1) EV and hybrid electric vehicle (HEV) test results, (2) operating experience with and performance trends of various EV and HEV models, and (3) experience with operating hydrogen-fueled vehicles. Data presented for EVs will include vehicle efficiency (km/kWh), average distance driven per charge, and range testing results. The HEV data will include operating considerations, fuel use rates, and range testing results.

  9. Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order 422.1, CONDUCT OF OPERATIONS Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS The general approach to implementing DOE O 422.1 is for contractors to develop, for DOE line management approval, documentation demonstrating implementation of the requirements in the contractor requirements document (CRD). DOE line management means the Federal officials such as Secretarial Officers and heads of field elements responsible for DOE facilities and operations. It is necessary to provide a conduct

  10. DOE-HDBK-1122-99; Radiological Control Technician Training

    Broader source: Energy.gov (indexed) [DOE]

    PNL; Richland, Wa. 3. DOE-STD-1098-99, "DOE Radiological Control Standard". 4. 10 CFR Part 835 (1998) "Occupational Radiation Protection". 5. "The Health Physics and ...

  11. DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion

    Energy Savers [EERE]

    Department of Energy EO 13563 January 2014 Update Report and Burden Reduction Efforts DOE EO 13563 January 2014 Update Report and Burden Reduction Efforts DOE Retrospective Review Plan and Burden Reduction Report January 2014 DOE Retrospective Review Plan and Burden Reduction Report January 2014 FINAL (108.53 KB) More Documents & Publications DOE Retrospective Review Plan Report May 2012 DOE Retrospective Review Plan and Burden Reduction Report July 29, 2013 DOE 13563 and ICR Report

  12. EA-1889: Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) at the Hanford Site, Richland, Washington

    Broader source: Energy.gov [DOE]

    This EA, prepared by the Department of the Navy, evaluates the environmental impacts of the disposal of decommissioned, defueled, naval reactor plants from the USS Enterprise at DOE’s Hanford Site, Richland, Washington. DOE participated as a cooperating agency in the preparation of this EA. The Department of the Navy issued its FONSI on August 23, 2012.

  13. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stacy Charboneau, Assistant Manager for Safety and Environment, Department of Energy Richland Operations Office June 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3 Richland

  14. Microsoft PowerPoint - DOE presentation RL Site_DOE-RL.pptx [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Site Report Survey Purpose * DOE tasked EurekaFacts to conduct a Hanford site-wide (federal and contractor) employee survey * Purpose - evaluate current state of Hanford's - Organizational Climate - Safety Culture - Safety Conscious Work Environment (SCWE) - Establish a baseline to develop and measure continuous improvement effort 2 Study Description * 2012 Hanford organizational survey was conducted between June 6, 2012 and 27, 2012. * Data were gathered through an

  15. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E-1 APPENDIX E DESCRIPTIONS OF FACILITIES, OPERATIONS, AND TECHNOLOGIES Appendix E provides additional information about the technologies, processes, and facilities for the three key activities of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington: tank closure, Fast Flux Test Facility decommissioning, and waste management. Section E.1 includes this information for tank closure; Section E.2, for Fast Flux Test Facility

  16. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P-1 APPENDIX P ECOLOGICAL RESOURCES AND RISK ANALYSIS This appendix presents the ecological resources (see Section P.1) at the Hanford Site and lists the plants and animals evaluated in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Potential impacts of both airborne releases during operations and groundwater discharges under the various alternatives are evaluated in this appendix. The purpose of the risk analysis is to compare

  17. DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ohio and Kentucky Facilities | Department of Energy DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at Ohio and Kentucky Facilities DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at Ohio and Kentucky Facilities April 1, 2015 - 3:30pm Addthis Media Contact: Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking a contractor to perform

  18. file://L:\DOE-hanford.gov\public\boards\hab\advice\advice68.htm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DC 20585 John Wagoner, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Subject: Ten Year Plan Dear Messrs. Alm and Wagoner: The Board has continued to track and advise on Hanford's budget. This advice should be taken in context with the Board's budget advice. Unfortunately, information we have seen regarding the direction of the national Ten Year Plan seems out of step with ongoing cleanup at Hanford. For example, Hanford does not plan for or assume

  19. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ▪ Public Comments and DOE Responses 3-1053 Campaign A March 16, 2010 As a resident of the Pacifc Northwest, I oppose the "preferred alternative" to ship nuclear waste from other Department of Energy sites to Hanford, as outlined in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (DOE/EIS--0391). I vehemently oppose the plan to add more radioactive waste to the Hanford site. Shipping this waste along Northwest

  20. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation`s supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington.

  1. Environmental Protection, Safety, and Health Protection Program for DOE Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-04-21

    This Page Change transmits a revised Attachment 1, a table of contents, and one chapter of DOE O 5480.1.

  2. Environmental Protection, Safety, and Health Protection Program for DOE Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-05-01

    This Page Change transmits a revised Attachment 1, a table of contents, and one chapter of DOE O O 5480.1.

  3. Environmental Protection, Safety, and Health Protection Program for DOE Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1980-12-18

    This page change transmits a revised Attachment 1, a table of contents, and 6 chapters of DOE O 5480.1.

  4. Environmental Protection, Safety, and Health Protection Program for DOE Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-05-22

    This Page Change transmits a revised table of contents and Attachment 1, and adds four chapters of DOE O 5480.1.

  5. Preparation of Documented Safety Analysis for Interim Operations at DOE Nuclear Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3011-2016 January 2016 DOE STANDARD PREPARATION OF DOCUMENTED SAFETY ANALYSIS FOR INTERIM OPERATIONS AT DOE NUCLEAR FACILITIES U.S. Department of Energy AREA SAFT Washington, DC 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-3011-2016 ii FOREWORD 1. This Department of Energy (DOE) Standard (STD) has been approved to be used by DOE, including the National Nuclear Security Administration, and their contractors. 2. Beneficial comments

  6. DOE Issues Final Request for Proposal for the Operation of Depleted Uranium

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hexafluoride (DUF6) Conversion Facilities | Department of Energy the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities DOE Issues Final Request for Proposal for the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities September 8, 2015 - 3:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the Operation of Depleted

  7. DOE Selects ASE to Manage and Operate its National Renewable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy ASE to Manage and Operate its National Renewable Energy Laboratory DOE Selects ASE to Manage and Operate its National Renewable Energy Laboratory July 29, 2008 - 2:40pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the Alliance for Sustainable Energy (ASE) LLC has been selected as the management and operating contractor for DOE's National Renewable Energy Laboratory (NREL) in Golden, Colorado. The cost-plus award-fee contract is

  8. DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Site | Department of Energy Nuclear Solutions, LLC to Manage and Operate its Savannah River Site DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site January 10, 2007 - 10:24am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Savannah River Nuclear Solutions (SRNS), LLC has been selected as the management and operating contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The

  9. Operational Awareness Records and Activity Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 Independent Activity Report, Richland Operations Office - June 2011 Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration...

  10. Approved: 6-29-2010, Conduct of Operations, DOE O 422.1

    Broader source: Energy.gov [DOE]

    1. PURPOSE. The objective of this Order is to define the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear...

  11. DOE-SR Exercises Option on Management and Operating Contract | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy DOE-SR Exercises Option on Management and Operating Contract DOE-SR Exercises Option on Management and Operating Contract August 4, 2016 - 12:00pm Addthis Media Contact: Jim Giusti, DOE-SR, (803) 952-8283 james-r.giusti@srs.gov The Department of Energy (DOE), Savannah River Operations Office, will exercise an option to extend the term of the current management and operating contract with Savannah River Nuclear Solutions (SRNS) for an additional 22 months, from Oct. 1, 2016 to July

  12. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames...

  13. DOE MURI: Hig-Operating Temperature Heat Transfer Fluids for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Operating Temperature Liquid Metal Heat Transfer Fluids - FY13 Q2 High Operating Temperature Heat Transfer Fluids for Solar Thermal Power Generation FY13 Q1 Corrosion in Very ...

  14. DOE Office of Science Computing Facility Operational Assessment Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental Management 2015 Year in Review December 23, 2015 - 10:00am Addthis DOE Office of Environmental Management 2015 Year in Review Version Available for Download "I am proud of all of the work we in EM-both at headquarters and in the field-have accomplished this year. While facing the most complex cleanup challenges, measurable progress was made in 2015-a testament to our skilled workforce. The

  15. DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 7, 2016 DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center New Mexico Governor Susana Martinez joined U.S. Department of Energy (DOE) officials for a ribbon cutting ceremony to mark the completion of a new state-of-the- art Emergency Operations Center (EOC) located in Carlsbad, NM. "We're pleased to share this accomplishment with Governor Martinez and other state and community leaders," said Mark Whitney, DOE's Principal Deputy Assistant Secretary for

  16. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Argonne National Laboratory | Department of Energy Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office

  17. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Princeton Plasma Physics Laboratory | Department of Energy Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility

  18. Field Operations | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Field Operations About About Home Organization Budget Field Operations Federal Advisory Committees History Scientific and Technical Information Honors & Awards Jobs Brochures, Logos, & Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 Field Operations Print Text Size: A A A FeedbackShare Page NEPA Documents » Categorical Exclusion (CX) Determinations Environmental Assessments

  19. Operations Improvement Committee | U.S. DOE Office of Science...

    Office of Science (SC) Website

    and direct support of the development, construction, and operation of unique, open-access scientific user facilities, housed at its 10 Office of Science national laboratories. ...

  20. U. S. Department of Energy Savannah River Operations Office - DOE-SR News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases Releases DOE-SR News Releases DOE-SR Exercises Option on Management and Operating Contract SR-2016-08-04 Adobe Acrobat PDF DOE Releases Final Request for Proposal for Savannah River Site Liquid Waste Services SR-2016-06-30 Adobe Acrobat PDF DOE HOLDS RIBBON CUTTING FOR NEW SALT WASTE PROCESSING FACILITY SR-2016-06-21 Adobe Acrobat PDF DOE DECLARES CONSTRUCTION OF SALT WASTE PROCESSING FACILITY COMPLETE SR-2016-06 Adobe Acrobat PDF DOE Releases Draft Request for Proposal and

  1. FTCP Site Specific Information – Richland Operations Office

    Broader source: Energy.gov [DOE]

    Site Specific Information including Annual Workforce Analysis and Staffing Plan Reports and TQP Self-Assessments

  2. Independent Activity Report, Richland Operations Office- January 2011

    Broader source: Energy.gov [DOE]

    Presentation of Questions Associated With the Safety Analysis Report for Packaging (Onsite) Multi-Canister Overpack Cask [ARPT-RL-2011-001

  3. EM's Richland Operations Office Completes Chromium Cleanup along...

    Office of Environmental Management (EM)

    soil from a massive waste site near Hanfords D and DR Reactors. Workers cleaned up chromium plumes at least 85-feet deep to remove the source of chromium-contaminated soil ...

  4. EM's Richland Operations Office Marks Milestone in Preparing its

    Office of Environmental Management (EM)

    Environment | Department of Energy Supports Testing Wireless Technology in Secure Environment EM's Laboratory Supports Testing Wireless Technology in Secure Environment January 29, 2014 - 12:00pm Addthis Joe Cordaro of SRNL observes the secure wireless TAM cart. Joe Cordaro of SRNL observes the secure wireless TAM cart. AIKEN, S.C. - Wireless networks have become commonplace in homes, restaurants and retail environments. But up to now, they have not been suitable for secure environments.

  5. Hanford People Core (HCP) PIA, Richland Operations Office | Department...

    Energy Savers [EERE]

    E-IDR (Inventory Disclosure Record) PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Integrated Safety Management Workshop...

  6. Badge Request System PIA, Richland Operations Office | Department...

    Energy Savers [EERE]

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  7. EM's Richland Operations Office Marks Milestone in Preparing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company now focus on cleaning the large concrete canyon in which the tanks once hung, as well as removing sections of contaminated ventilation...

  8. Richland Operations Office FY 14/15 Funding Marks

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office FY 14/15 Funding Marks PBS PBS Title FY 2014 Omnibus (Enacted) FY 2015 President's Budget FY 2015 Omnibus Allocation RL-0011 NM Stabilization and Disposition - PFP 142,670 168,228 137,130 RL-0012 SNF Stabilization and Disposition 98,369 76,777 67,746 RL-0012 15-D-401 Containerized Sludge Line Item 26,290 46,055 RL-0013 Solid Waste Stabilization and Disposition - 200 Area 130,126 112,371 107,651 RL-0030 Soil and Water Remediation - Groundwater/Vadose Zone 141,500 116,916 184,929 Subtotal

  9. 2010 Annual Planning Summary for Richland Operations Office (RL)

    Broader source: Energy.gov [DOE]

    Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

  10. Much Accomplished at Hanford in 2010: Richland Operations Office...

    Office of Environmental Management (EM)

    ... and 362 debris sites on the Arid Lands Ecology Reserve and Rattlesnake Mountain. ... Reduced MSA CO2 emissions on the site by 36 percent using Ethanol 85 alternative fuel. ...