National Library of Energy BETA

Sample records for doe requires westinghouse

  1. DOE Requires Westinghouse to Cease Sales of Two Light Bulb Models...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    product code 0521000), which is manufactured by Fuzhou and sold under the Westinghouse brand. The companies previously submitted data to DOE showing that 12 Westinghouse-brand...

  2. DOE Requires Westinghouse to Cease Sales of Two Light Bulb Models and Allows Sale of Another

    Broader source: Energy.gov [DOE]

    As a part of DOE's continuing enforcement action against Westinghouse Lighting Corporation, the company must cease sales of two light bulb models - medium based CFL basic model 15GLOBE/65/2 ...

  3. DOE Initiates Enforcement Proceedings against Westinghouse and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued) DOE Initiates Enforcement Proceedings against Westinghouse and...

  4. DOE, Westinghouse sponsor medical technician course

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sponsor Emergency Medical Technician Course CARLSBAD, N.M., February 24, 2000 - The U.S. Department of Energy (DOE) Carlsbad Area Office and the Westinghouse Waste Isolation Division are sponsoring a six- week Emergency Medical Technician-Basic course, March 1-April 19, at the Skeen-Whitlock Building, 4021 National Parks Highway. Classes are from 8 a.m. to 4 p.m., Mondays, Wednesdays, and every other Friday, as scheduled. The course, held in conjunction with the University of New Mexico

  5. DOE - Office of Legacy Management -- Westinghouse Advanced Reactors...

    Office of Legacy Management (LM)

    Decommissioning of the Westinghouse Nuclear Fuel Facility at Cheswick, PA, 2 Volumes; June 1984 PA.10-4 - Aerospace Corporation Letter; Young to Wallo (DOE); Subject: Status of ...

  6. Westinghouse VANTAGE+ fuel assembly to meet future PWR operating requirements

    SciTech Connect (OSTI)

    Doshi, P.K.; Chapin, D.L.; Scherpereel, L.R.

    1988-01-01

    Many utilities operating pressurized water reactors (PWRs) are implementing longer reload cycles. Westinghouse is addressing this trend with fuel products that increase fuel utilization through higher discharge burnups. Higher burnup helps to offset added enriched uranium costs necessary to enable the higher energy output of longer cycles. Current fuel products have burnup capabilities in the area of 40,000 MWd/tonne U or more. There are three main phenomena that must be addressed to achieve even higher burnup levels: accelerated cladding, waterside corrosion, and hydriding; increased fission gas production; and fuel rod growth. Long cycle lengths also require efficient burnable absorbers to control the excess reactivity associated with increased fuel enrichment while maintaining a low residual absorber penalty at the end of cycle. Westinghouse VANTAGE + PWR fuel incorporates features intended to enhance fuel performance at very high burnups, including advances in the three basic elements of the fuel assembly: fuel cladding, fuel rod, and fuel assembly skeleton. ZIRLO {sup TM} cladding, an advanced Zircaloy cladding that contains niobium, offers a significant improvement in corrosion resistance relative to Zircaloy-4. Another important Westinghouse PWR fuel feature that facilitates long cycles is the zirconium diboride integral fuel burnable absorber (ZrB{sub 2}IFBA).

  7. DOE - Office of Legacy Management -- Westinghouse Electric Corp - NJ 03

    Office of Legacy Management (LM)

    Electric Corp - NJ 03 FUSRAP Considered Sites Site: WESTINGHOUSE ELECTRIC CORP. ( NJ.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: North American Phillips Lighting Westinghouse Electric Company Lamp Divisions North American Philips Lighting Corporation NJ.03-1 NJ.03-2 NJ.03-3 Location: One Westinghouse Plaza - Building 7 , Bloomfield , New Jersey NJ.03-4 Evaluation Year: 1985 NJ.03-3 Site Operations: From 1941 to 1943, developed a photochemical

  8. DOE and westinghouse to hold public meetings on proposed modificatons to WIPP hazadous waste permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Westinghouse to Hold Public Meetings On Proposed Modifications to WIPP Hazardous Waste Permit CARLSBAD, N.M., April 7, 2000 - The public is invited to comment on proposed modifications to the hazardous waste facility permit for the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). On April 5, DOE and the Westinghouse Waste Isolation Division submitted three proposed permit modifications to the New Mexico Environment Department (NMED). The modifications do not concern

  9. DOE - Office of Legacy Management -- Westinghouse Advanced Reactors Div

    Office of Legacy Management (LM)

    Plutonium and Advanced Fuel Labs - PA 10 Advanced Reactors Div Plutonium and Advanced Fuel Labs - PA 10 FUSRAP Considered Sites Site: WESTINGHOUSE ADVANCED REACTORS DIV., PLUTONIUM FUEL LABORATORIES, AND THE ADVANCED FUEL LAB (PA.10 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cheswick , Pennsylvania PA.10-1 Evaluation Year: Circa 1987 PA.10-1 PA.10-4 Site Operations: 1960s and 1970s - Produced light water and fast

  10. DOE - Office of Legacy Management -- Westinghouse Atomic Power Development

    Office of Legacy Management (LM)

    Plant - PA 04 Power Development Plant - PA 04 FUSRAP Considered Sites Site: WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT (PA.04 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: East Pittsburgh , Pennsylvania PA.04-1 Evaluation Year: 1985 PA.04-2 Site Operations: Research and development on uranium oxide fuel elements in the 1940s. PA.04-3 PA.04-5 Site Disposition: Eliminated - Radiation levels below criteria PA.04-1 Radioactive

  11. DOE - Office of Legacy Management -- Westinghouse Naval Ordnance - MI 02

    Office of Legacy Management (LM)

    Naval Ordnance - MI 02 FUSRAP Considered Sites Site: WESTINGHOUSE NAVAL ORDNANCE (MI.02 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Detroit , Michigan MI.02-1 Evaluation Year: 1987 MI.02-2 Site Operations: Worked under contract with the Albuquerque Operations Office. No indication that radioactive material was involved under the contract. MI.02-2 Site Disposition: Eliminated - No indication radioactive

  12. Microsoft Word - DOE-ID-14-089 Westinghouse EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SECTION A. Project Title: Development of Thermo-Acoustic Sensors for Sodium-cooled Fast Reactors - Westinghouse Electric Company LLC SECTION B. Project Description Westinghouse ...

  13. Microsoft Word - DOE-ID-13-004 Westinghouse EC B3-6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Modeling and Validation of Sodium Plugging for Heat Exchangers in Sodium-cooled Fast Reactor Systems - Westinghouse Electric Company LLC SECTION B. Project Description Westinghouse proposes to perform development and testing of new experimental techniques for detecting the presence of Na 2 O, as well as to measure the thickness of the corresponding deposits on channel walls. These tasks will be accomplished using the Sodium Plugging Phenomena Loop (SPPL) available at

  14. DOE Requires Manufacturer and Labeler to Cease Sale of Incandescent Reflector Lamps

    Broader source: Energy.gov [DOE]

    DOE has issued Notices of Non-Compliance Determination to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company requiring that they halt the sale of 8 basic...

  15. Westinghouse Lighting: Notice of Allowance (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Allowance to Westinghouse Lighting Corporation allowing Westinghouse Lighting to resume distribution of various lamp products after Westinghouse Lighting provided new test data performed according to DOE regulations.

  16. DOE - Office of Legacy Management -- Westinghouse Atomic Power Div - PA 16

    Office of Legacy Management (LM)

    Power Div - PA 16 FUSRAP Considered Sites Site: WESTINGHOUSE ATOMIC POWER DIV. (PA.16 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Route 30 (Forrest Hills) , Pittsburgh , Pennsylvania PA.16-1 Evaluation Year: 1985 PA.16-1 Site Operations: Processed uranium metal for research and development and pilot-scale production of uranium oxide fuel elements. Prepared uranium metal for Enrico Fermi's Stagg Field experiment. PA.16-1 Site

  17. DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued)

    Broader source: Energy.gov [DOE]

    The Office of General Counsel has issued Notices of Proposed Civil Penalty to Westinghouse Lighting Corporation and Mitsubishi Electric & Electronics USA, Inc. for failing to certify that...

  18. DOE Requires Manufacturer and Labeler to Cease Sale of Incandescent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Non-Compliance Determination to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company requiring that they halt the sale of 8 basic...

  19. Enforcement Letter, Westinghouse Savannah River Company - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company related to repeated criticality safety violations in 2002 and 2003 at the H-Canyon facility at DOE's Savannah River Site. PDF icon Enforcement Letter, Westinghouse...

  20. Westinghouse Test Stand Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Non-Proprietary Class 3 © 2014 Westinghouse Electric Company LLC. All Rights Reserved MT-14-12 Westinghouse VERA Test Stand Zero Power Physics Test Simulations for the AP1000® PWR Fausto Franceschini, Westinghouse Electric Company LLC Andrew Godfrey, Oak Ridge National Laboratory Joel Kulesza, Westinghouse Electric Company LLC Robert Oelrich, Westinghouse Electric Company LLC L3.AMA.VDT.P8.01 Milestone Report CASL-U-2014-0012-000 March 6, 2014 MT-14-12 Westinghouse VERA Test Stand

  1. Westinghouse Lighting: Order (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE ordered Westinghouse Lighting Corporation to pay a $50,000 civil penalty after finding Westinghouse Lighting had failed to certify that certain models of general service flourescent and incandescent reflector lamps comply with the applicable energy conservation standards.

  2. Westinghouse Advanced Reactors Division Plutonium Fuel Laboratories

    Office of Legacy Management (LM)

    Radiological Condition of the Westinghouse Advanced Reactors Division Plutonium Fuel Laboratories Cheswick, Pennsylvania -. -, -- AGENCY: Office of Operational Safety, Department of Energy ACTION: Notice of Availability of Archival Information Package SUMMARY: The Office of Operational Safety of the Department of Energy (DOE) has, reviewed documentation relating to the decontamination and decommissioning operations conducted at the Westinghouse Advanced Reactor Division laboratories (buildings 7

  3. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly ...

  4. Westinghouse Lighting: Noncompliance Determination (2010-CE-09/1001)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE issued a Notice of Noncompliance Determination to Westinghouse Lighting Corporation finding that model F40T12/CWE (Westinghouse product code 07521000), a general service fluorescent lamp, and model 15GLOBE/65/2 (Westinghouse product code 3800400), a medium base compact fluorescent lamp, do not comport with the energy conservation standards.

  5. CASL - Westinghouse Electric Company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Electric Company Cranberry Township, PA Westinghouse Electric Company provides fuel, services, technology, plant design and equipment for the commercial nuclear electric power industry. Westinghouse nuclear technology is helping to provide future generations with safe, clean and reliable electricity. Key Contributions Definition of CASL challenge problems Existing codes and expertise Data for validation Computatinoal fluid dynamics modeling and analysis Development of test stand for

  6. DOE Challenge Home, California Program Requirements

    Broader source: Energy.gov [DOE]

    DOE Challenge Home, California Program Requirements, as posted on the U.S. Department of Energy's DOE Challenge Home website.

  7. Westinghouse Lighting: Noncompliance Determination (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Noncompliance Determination to Westinghouse Lighting Corporation finding that various models of incandescent reflector lamps do not comport with the energy conservation standards.

  8. Westinghouse Earns 15th Consecutive Mine Safety Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for profit. This award recognizes Westinghouse's close attention to safety in a mining environment. WTS is the management and operating contractor for the DOE at the Waste...

  9. Westinghouse Announces Managerial Appointments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N.M., September 6, 2001 -- Westinghouse TRU Solutions LLC (WTS) has announced three management appointments in its Environment, Safety, and Health Department at the Waste...

  10. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section/ Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly implemented but not required. DOE-STD-1104-2014 will be required by DOE Order 420.1C, Page Change 1, soon to be approved (already concurred upon by the program offices and the Directives Review Board). DOE-STD-1104- 2014will now be a required method. For more discussion, see letter from Moniz to Winokur, October 18,

  11. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apr 24, 2015 NEW - DOE G 444.1 1, Guide on Preventing and Responding to All Forms of Violence in the Workplace Apr 20, 2015 DRAFT - DOE O 460.1D, Hazardous Materials Packaging and...

  12. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information, use the DOE Phonebook. Latest content created by this user Dec 29, 2015 Information Technology Project Execution Model Guide for Small and Medium Projects Jul 07,...

  13. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    writer. For contact information, use the DOE Phonebook. Latest content created by this user Mar 13, 2014 Occurrence Reporting and Processing of Operations Information Apr 08,...

  14. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Item Packaging and Transportation for Offsite Shipment of Materials of National Security Interest https:www.directives.doe.govinformational-purposes-only...

  15. Enforcement Letter, Westinghouse Savannah River Company- April 15, 1997

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site

  16. Westinghouse Pays $50,000 Civil Penalty to Resolve Light Bulb Efficiency

    Broader source: Energy.gov (indexed) [DOE]

    Violations | Department of Energy Department of Energy has successfully resolved the enforcement case against Westinghouse Lighting Corporation for failure to certify its light bulbs as compliant with DOE's federal efficiency requirements and for the sale of at least 29,000 general service fluorescent and medium base compact fluorescent lamps that used more energy than permitted by law. This case reflects DOE's renewed commitment to enforce the federal efficiency requirements systematically

  17. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Diane Johnson I load documents, fix links etc. Select a document from the list below to leave feedback for the writer. For contact information, use the DOE Phonebook. Latest...

  18. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tiffany M Wheeler Select a document from the list below to leave feedback for the writer. For contact information, use the DOE Phonebook. Latest content created by this user Jan...

  19. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH)...

  20. DOE Challenge Home, California Program Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling

  1. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  2. Westinghouse Presentation Template Class 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 R&D Summit "Innovation and Collaboration" Paolo Ferroni Westinghouse Electric Company February 25, 2014 CASL-U-2014-0356-000 CASL-U-2014-0356-000 1 Westinghouse...

  3. DOE Challenge Home, Washington Program Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories

  4. Quality Assurance - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    services meet or exceed customers' requirements and expectations. Cancels DOE O 414.1C. Adm Chg 1, 5-8-13 o414.1d4-25-11.pdf -- PDF Document, 243 KB Writer: Colette Broussard...

  5. Westinghouse Lighting: Proposed Penalty (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Westinghouse Lighting Corporation failed to certify various flourescent and incandescent reflector lamps as compliant with the applicable energy conservation standards.

  6. Understanding DOE Quality Assurance Requirements and ASME NQA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Materials Understanding DOE Quality Assurance Requirements and ASME NQA-1 For...

  7. Understanding DOE Quality Assurance Requirements and ASME NQA...

    Office of Environmental Management (EM)

    Agenda Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Agenda Agenda for the Understanding DOE Quality Assurance...

  8. Understanding and Implementing DOE Quality Requirements and ASME...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality...

  9. PRELIMINARY SURVEY OF WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA

    Office of Legacy Management (LM)

    WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA At the request of the Department of Energy (DOE, then ERDA), a preliminary survey

  10. Battery Pack Requirements and Targets Validation FY 2009 DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Pack Requirements and Targets Validation FY 2009 DOE Vehicle Technologies Program Battery Pack Requirements and Targets Validation FY 2009 DOE Vehicle Technologies Program...

  11. Implementation of DOE NPH Requirements at the Thomas Jefferson National

    Office of Environmental Management (EM)

    Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab | Department of Energy Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab David Luke, DOE, Thomas Jefferson Site Office

  12. DOE Zero Energy Ready Home National Program Requirements (Rev. 04) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Program Requirements (Rev. 04) DOE Zero Energy Ready Home National Program Requirements (Rev. 04) U.S. Department of Energy Zero Energy Ready Home National Program Requirements (Rev. 04) PDF icon DOE Zero Energy Ready Home National Program Requirements Rev04.pdf More Documents & Publications DOE Zero Energy Ready Home National Program Requirements (Rev. 05) California DOE ZERH Program Requiremets DOE Challenge Home, California Program Requirements

  13. Understanding DOE Quality Assurance Requirements and ASME NQA-1 For

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application in DOE Nuclear Projects Training Materials | Department of Energy DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Materials Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Materials Training Materials for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Workshop held on May 14, 2015. PDF icon

  14. DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA

    Broader source: Energy.gov [DOE]

    DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS. Key Cyber Security Role: Certification Agent (CA)

  15. DOE Zero Energy Ready Home National Program Requirements (Rev. 05) |

    Office of Environmental Management (EM)

    Department of Energy National Program Requirements (Rev. 05) DOE Zero Energy Ready Home National Program Requirements (Rev. 05) U.S. Department of Energy Zero Energy Ready Home National Program Requirements (Rev. 05), May, 11, 2015. PDF icon DOE Zero Energy Ready Home National Program Requirements Rev05 - Final.pdf More Documents & Publications California DOE ZERH Program Requiremets DOE Zero Energy Ready Home National Program Requirements (Rev. 04) DOE Challenge Home, California Program

  16. Westinghouse to host education fair

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Host Education Fair CARLSBAD, N.M., June 8, 2000 - The Westinghouse Waste Isolation Division (WID) invites the public to participate in an education fair June 14 in Carlsbad....

  17. Westinghouse Earns Safety Excellence Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse TRU Solutions LLC (WTS) has been recognized for safety excellence by the New Mexico State Mine Inspector. WTS is the management and operating contractor for the U.S....

  18. Washington DOE ZERH Program Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Washington specific program requirements for the U.S. Department of Energy's Zero Energy Ready Home Program. PDF icon ch_washington_requirements8-23-13.pdf More Documents & Publications DOE Challenge Home, California Program Requirements Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) DOE Zero Energy Ready Home National Program Requirements (Rev. 04)

  19. Understanding DOE Quality Assurance Requirements and ASME NQA-1 For

    Office of Environmental Management (EM)

    Application in DOE Nuclear Projects Training Agenda | Department of Energy Agenda Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Agenda Agenda for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Workshop held on May 14, 2015. PDF icon Agenda More Documents & Publications Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in

  20. DOE NEPA Guidance and Requirements - Search Index - Table of Contents |

    Office of Environmental Management (EM)

    Department of Energy Table of Contents DOE NEPA Guidance and Requirements - Search Index - Table of Contents Return to Download Page The DOE NEPA Guidance and Requirements - Search Index includes: NEPA Guidance and Requirements Documents Issued by Published A Brief Guide - DOE-wide Contracts For NEPA Documentation DOE 2003 A Citizen's Guide to the NEPA - Having Your Voice Heard CEQ 2007 A Resource Handbook on DOE Transportation Risk Assessment DOE 2002 Actions During the NEPA Process -

  1. DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS |

    Office of Environmental Management (EM)

    Department of Energy CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS puzzle-693870_960_720.jpg PDF icon DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS More Documents & Publications DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA Authorizing Official Designated Representative (AODR)

  2. DOE NEPA Guidance and Requirements - Search Index - List of Contents |

    Office of Environmental Management (EM)

    Department of Energy List of Contents DOE NEPA Guidance and Requirements - Search Index - List of Contents Return to Download Page The NEPA Guidance and Requirements - Search Index includes: A Brief Guide - DOE-wide Contracts For NEPA Documentation [DOE][2003] A Citizen's Guide to the NEPA - Having Your Voice Heard [CEQ][2007] A Resource Handbook on DOE Transportation Risk Assessment [DOE][2002] Actions During the NEPA Process - Interim Actions [DOE][2003] Administrative Record Guidance

  3. Overview of Westinghouse`s Advanced Turbine Systems Program

    SciTech Connect (OSTI)

    Bannister, R.L.; Bevc, F.P.; Diakunchak, I.S.; Huber, D.J.

    1995-12-31

    The proposed approach is to build on Westinghouse`s successful 501 series of gas turbines. The 501F offered a combined cycle efficiency of 54%; 501G increased this efficiency to 58%; the proposed single-shaft 400 MW class ATS combined cycle will have a plant cycle efficiency greater than 60%. Westinghous`s strategy is to build upon the next evolution of advances in combustion, aerodynamics, cooling, leakage control, materials, and mechanical design. Westinhouse will base its future gas turbine product line, both 50 and 60 Hz, on ATS technology; the 501G shows early influences of ATS.

  4. Requirements for shipment of DOE radioactive mixed waste

    SciTech Connect (OSTI)

    Gablin, K.; No, Hyo; Herman, J.

    1993-08-01

    There are several sources of radioactive mixed waste (RMW) at Argonne National Laboratory which, in the past, were collected at waste tanks and/or sludge tanks. They were eventually pumped out by special pumps and processed in an evaporator located in the waste operations area in Building No. 306. Some of this radioactive mixed waste represents pure elementary mercury. These cleaning tanks must be manually cleaned up because the RMW material was too dense to pump with the equipment in use. The four tanks being discussed in this report are located in Building No. 306. They are the Acid Waste Tank, IMOX/FLOC Tanks, Evaporation Feed Tanks, and Waste Storage Tanks. All of these tanks are characterized and handled separately. This paper discusses the process and the requirements for characterization and the associated paperwork for Argonne Waste to be shipped to Westinghouse Hanford Company for storage.

  5. Programmatic Elements - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Operational Emergency Base Program Supersedes: DOE G 151.1-1 V5-4, Training and Drills on Jul 11, 2007 DOE G 151.1-1 V5-1, Program Administration on Jul 11, 2007 DOE G...

  6. Silver Spring Networks comments on DOE NBP RFI: Comms Requirements |

    Energy Savers [EERE]

    Department of Energy Comms Requirements Silver Spring Networks comments on DOE NBP RFI: Comms Requirements Comments of Silver Spring Networks on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy PDF icon Silver Spring Networks comments on DOE NBP RFI: Comms Requirements More Documents & Publications Silver Spring Networks comments on DOE NBP RFI: Data Access NBP RFI: Communications Requirements-

  7. References - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (NAPs) FAR Federal Acquisition Regulations Federal Acquisition Regulations (FAR) DOE Acquisition Regulations (DEAR) CFR Code of Federal Regulations CFR (annual edition) 10 CFR...

  8. NERSC/DOE HEP Requirements Workshop Presentations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | DOE HEP Overview November 12, 2009 | Author(s): Amber Boehnlein | Workshop Logistics November 12, 2009 | Author(s): Harvey Wasserman | NERSC Role in High Energy Physics...

  9. Fire Protection - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are not comprehensively or adequately addressed in national consensus standards or other design criteria. DOE-STD-1062-2012: Fire Protection Type: Invoked Technical Standards OPI:...

  10. Radiological Control - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    98-2008, Change Notice 1, Radiological Control by Diane Johnson The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities...

  11. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised,...

  12. DRB Liaison - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DRB Liaison by Website Administrator Emily Jackson Directives Review Board Liaison 202-287-5641 Portals III Building, Suite 500 Emily.Jackson@hq.doe.gov Chris Tirado 202-586-4967...

  13. Top 10 - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Top 10 by Website Administrator The 10 most frequently accessed documents from last month. Document Viewed Number of Times Viewed DOE O 413.3B, Program and Project Management for...

  14. DOE SC Exascale Requirements Reviews: High Energy Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics DOE SC Exascale Requirements Reviews: High Energy Physics The DOE Office of Science Exascale Requirements Review for High Energy Physics will bring together key computational domain scientists, DOE planners and administrators, and experts in computer science and applied mathematics to determine the requirements for an exascale ecosystem that includes computation, data analysis, software, workflows, HPC services, and whatever else is needed to support forefront scientific research in High

  15. DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Responses to Draft Specification Comments 1 Updated 4/9/2012 DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments DOE received comments on the draft DOE Challenge Home specifications and requirements from December 15, 2011 through January 31, 2012. This document summarizes the comments received, DOE's responses, and the resulting policy change, if any. All comments were reviewed. Similar comments were grouped together in the responses.

  16. Staffing and Placement - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DRAFT DOE O 325.3, Staffing and Placement by Tiffany M Wheeler Functional areas: Staffing, Placement, Recruiting, Excepted Service The Order establishes requirements and...

  17. DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...

    Energy Savers [EERE]

    the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications...

  18. DOE Issues Request for Information for Scope Requirements Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The successful offeror will be assisting the DOE with the development of an acquisition strategy and definition of requirements for future acquisitions; therefore, the successful...

  19. Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  20. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  1. Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  2. Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  3. News & Updates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  4. Rescinded Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  5. Physical Protection - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2A, Physical Protection by jcronin Functional areas: Security, This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys...

  6. Biosafety Facilities - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Biosafety Facilities by David Freshwater Functional areas: Defense Nuclear Facility Safety and Health Requirement, Safety and Security, The Guide assists DOENNSA field elements...

  7. Battery Pack Requirements and Targets Validation FY 2009 DOE Vehicle

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Program | Department of Energy Pack Requirements and Targets Validation FY 2009 DOE Vehicle Technologies Program Battery Pack Requirements and Targets Validation FY 2009 DOE Vehicle Technologies Program 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon es_01_santini.pdf More Documents & Publications Well-to-Wheels Analysis of Energy Use and Greenhouse Gas Emissions of

  8. DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments

    Broader source: Energy.gov [DOE]

    DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments, a publication of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

  9. DOE Proposes Requirement for Certification of Admissibility for Covered

    Energy Savers [EERE]

    Products and Equipment | Department of Energy Proposes Requirement for Certification of Admissibility for Covered Products and Equipment DOE Proposes Requirement for Certification of Admissibility for Covered Products and Equipment February 22, 2016 - 6:26pm Addthis DOE has issued a Notice of Proposed Rulemaking (NOPR) in which it proposes to require that a person importing into the United States any covered product or equipment subject to an applicable energy conservation standard provide,

  10. Enforcement Letter, Westinghouse Waste Isolation Division - October...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company, L.L.C - September 11, 2000 Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

  11. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the...

  12. Enforcement Letter, Westinghouse Hanford Corporation - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Enforcement Letter, Westinghouse Hanford Corporation - July 6, 1995 Inspection Report: IG-0401 Enforcement Letter, Fluor Daniel Hanford, Inc - July 31, 1998...

  13. The INL Seismic Risk Assessment Project: Requirements for Addressing DOE

    Office of Environmental Management (EM)

    Order 420.1C & A Proposed Generic Methodology | Department of Energy The INL Seismic Risk Assessment Project: Requirements for Addressing DOE Order 420.1C & A Proposed Generic Methodology The INL Seismic Risk Assessment Project: Requirements for Addressing DOE Order 420.1C & A Proposed Generic Methodology Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. PDF icon The INL Seismic Risk Assessment Project: Requirements for Addressing DOE Order 420.1C & A

  14. DOE Recovery Act Reporting Requirements for the State Energy Program

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) State Energy Program (SEP) reporting requirements for states and U.S. territories receiving SEP grants under the 2009 Recovery Act.

  15. Can Cloud Computing Address the Scientific Computing Requirements for DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researchers? Well, Yes, No and Maybe Can Cloud Computing Address the Scientific Computing Requirements for DOE Researchers? Well, Yes, No and Maybe Can Cloud Computing Address the Scientific Computing Requirements for DOE Researchers? Well, Yes, No and Maybe January 30, 2012 Jon Bashor, Jbashor@lbl.gov, +1 510-486-5849 Magellan1.jpg Magellan at NERSC After a two-year study of the feasibility of cloud computing systems for meeting the ever-increasing computational needs of scientists,

  16. Westinghouse Cementation Facility of Solid Waste Treatment System - 13503

    SciTech Connect (OSTI)

    Jacobs, Torsten; Aign, Joerg

    2013-07-01

    During NPP operation, several waste streams are generated, caused by different technical and physical processes. Besides others, liquid waste represents one of the major types of waste. Depending on national regulation for storage and disposal of radioactive waste, solidification can be one specific requirement. To accommodate the global request for waste treatment systems Westinghouse developed several specific treatment processes for the different types of waste. In the period of 2006 to 2008 Westinghouse awarded several contracts for the design and delivery of waste treatment systems related to the latest CPR-1000 nuclear power plants. One of these contracts contains the delivery of four Cementation Facilities for waste treatment, s.c. 'Follow on Cementations' dedicated to three locations, HongYanHe, NingDe and YangJiang, of new CPR-1000 nuclear power stations in the People's Republic of China. Previously, Westinghouse delivered a similar cementation facility to the CPR-1000 plant LingAo II, in Daya Bay, PR China. This plant already passed the hot functioning tests successfully in June 2012 and is now ready and released for regular operation. The 'Follow on plants' are designed to package three 'typical' kind of radioactive waste: evaporator concentrates, spent resins and filter cartridges. The purpose of this paper is to provide an overview on the Westinghouse experience to design and execution of cementation facilities. (authors)

  17. DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled

    Office of Environmental Management (EM)

    "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" | Department of Energy RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband

  18. Effluent emissions monitoring at the DOE Hanford Site

    SciTech Connect (OSTI)

    Vance, L.W.

    1993-05-01

    There are numerous regulatory requirements controlling the effluent emissions monitoring at a U.S. Department of Energy site. This paper defines how these regulatory effluent emissions monitoring requirements and the Quality Assurance oversight of these requirements were implemented by Westinghouse Hanford Company, the operations contractor, at the DOE Hanford Site.

  19. DOE-STD-1077-94; DOE Standard Training Accreditation Program Standard: Requirements and Guidelines

    Office of Environmental Management (EM)

    7-94 August 1994 Supercedes DOE-STD-0101T, TAP-1, and DOE-STD-0103T, TAP-3 DOE STANDARD TRAINING ACCREDITATION PROGRAM STANDARD: REQUIREMENTS AND GUIDELINES U.S. Department of Energy Washington, D.C. 20585 FSC 6910 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831;

  20. DOE Zero Energy Ready Home PV-Ready Checklist DOE Zero Energy Ready Home National Program Requirements Mandatory Requirement 7

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Zero Energy Ready Home PV-Ready Checklist DOE Zero Energy Ready Home National Program Requirements Mandatory Requirement 7 (Renewable Ready) shall be met by any home certified under the DOE Zero Energy Ready Home program, only where all three conditions of the following conditions are met. If any of these three conditions is not met, the home is exempt from requirements contained in the PV- Ready checklist. 1. Location, based on zip code has at least 5 kWh/m 2 /day average daily solar radiation

  1. Enforcement Letter, Westinghouse Savannah River Company- April 19, 2004

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site

  2. Enforcement Letter, Westinghouse Savannah River Company- November 14, 2003

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to Westinghouse Savannah River Company related to Criticality Safety Violations at the Savannah River Site

  3. Enforcement Letter, Westinghouse Savannah River Company- July 21, 1998

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Notification of Incomplete Corrective Action

  4. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  5. Westinghouse TRU Solutions Launches New Web Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TRU Solutions LLC Launches New Web Site CARLSBAD, N.M., February 2, 2001 - Westinghouse TRU Solutions LLC (WTS) today launched its new Web site. WTS is the new management and ...

  6. Remediation of DOE hazardous waste sites: Planning and integration requirements

    SciTech Connect (OSTI)

    Geffen, C.A.; Garrett, B.A.; Cowan, C.E.; Siegel, M.R.; Keller, J.F. )

    1989-09-01

    The US Department of Energy (DOE) is faced with a immense challenge in effectively implementing a program to mitigate and manage the environmental impacts created by current operations and from past activities at its facilities. The current regulatory framework and public interest in the environmental arena have made operating DOE facilities in an environmentally responsible manner a compelling priority. This paper provides information on the results of a project funded by DOE to obtain a better understanding of the regulatory and institutional drivers in the hazardous waste market and the costs and timeframes required for remediation activities. Few realize that before remediating a hazardous waste site, a comprehensive planning process must be conducted to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. The US Environmental Protection Agency (EPA) and others have found that it may take up to 7 years to complete the planning process at an average cost of $1.0 million per site. While cost information is not yet available for DOE sites, discussions with hazardous waste consulting firms indicate that average characterization and assessment costs will be 5 to 10 times this amount for DOE sites. The higher costs are expected because of the additional administrative requirements placed on DOE sites, the need to handle mixed wastes, the amount and extent of contamination at many of these sites, and the visibility of the sites. 15 refs., 1 fig., 2 tabs.

  7. CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

    Office of Legacy Management (LM)

    WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects ..-.. --__- _".-.-l--_--l -_._ _- --- ~~~. . ..~ CONTENTS Page - - I NTRODUCTI ON 1 Purpose 1 Docket Contents 1 Exhibit I: Summary of Activities at Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania

  8. Personnel Selection, Qualification, and Training Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-07-12

    To establish selection, qualification, and training requirements for management and operating (M&O) contractor personnel involved in the operation, maintenance, and technical support of Department of Energy and National Nuclear Security Administration Category A and B reactors and non-reactor nuclear facilities. Canceled by DOE O 426.2

  9. Requirements Crosswalk of DOE-STD-1104-2014 | Department of Energy

    Energy Savers [EERE]

    Requirements Crosswalk of DOE-STD-1104-2014 Requirements Crosswalk of DOE-STD-1104-2014 February 5, 2015 Requirements Crosswalk from DOE-STD-1104-2009 going to DOE-STD-1104-2014. This document provides a requirements Crosswalk from DOE-STD-1104-2009 going to DOE-STD-1104-2014. PDF icon Requirements Crosswalk of DOE-STD-1104-2014 More Documents & Publications DOE-STD-1104-2014 Training Crosswalk of DOE-STD-1104 Bases of Approval DOE-STD-1104-2014 Master Acronym List

  10. DOE-STD-6002-96; DOE Standard Safety of Magnetic Fusion Facilities: Requirements

    Office of Environmental Management (EM)

    2-96 May 1996 DOE STANDARD SAFETY OF MAGNETIC FUSION FACILITIES: REQUIREMENTS U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce,

  11. Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 | Department of Energy and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management Overview and Introduction, May 14, 2015 Understanding and Implementing DOE Quality Requirements and ASME NQA-1 in DOE Nuclear Projects, A Management

  12. Implementation of DOE NPH Requirements at the Thomas Jefferson...

    Office of Environmental Management (EM)

    Facility (TJNAF), a Non-Nuclear DOE Lab David Luke, DOE, Thomas Jefferson Site Office Stephen McDuffie, DOE, Office of the Chief of Nuclear Safety PDF icon Implementation of DOE...

  13. IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS

    SciTech Connect (OSTI)

    M.A. Ebadian, Ph.D.

    1999-01-01

    The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

  14. DOE-STD-3009-2014 Requirements Matrix | Department of Energy

    Office of Environmental Management (EM)

    Requirements Matrix DOE-STD-3009-2014 Requirements Matrix March 2, 2015 This document provides the Requirements table of DOE-STD-3009-2014 compared to the 1994 version DOE-STD-3009-1994. It breaks down the requirements including comments with page number and section citation. PDF icon DOE STD-3009-2014 Requirement Table More Documents & Publications DOE-STD-3009-2014 Training Modules (Changes to DOE-STD-3009 and Expectations for Effective Implementation) DOE-STD-3009-2014 Frequently Asked

  15. Westinghouse Small Modular Reactor balance of plant and supporting systems design

    SciTech Connect (OSTI)

    Memmott, M. J.; Stansbury, C.; Taylor, C.

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the second in a series of four papers which describe the design and functionality of the Westinghouse SMR. It focuses, in particular, upon the supporting systems and the balance of plant (BOP) designs of the Westinghouse SMR. Several Westinghouse SMR systems are classified as safety, and are critical to the safe operation of the Westinghouse SMR. These include the protection and monitoring system (PMS), the passive core cooling system (PXS), and the spent fuel cooling system (SFS) including pools, valves, and piping. The Westinghouse SMR safety related systems include the instrumentation and controls (I and C) as well as redundant and physically separated safety trains with batteries, electrical systems, and switch gears. Several other incorporated systems are non-safety related, but provide functions for plant operations including defense-in-depth functions. These include the chemical volume control system (CVS), heating, ventilation and cooling (HVAC) systems, component cooling water system (CCS), normal residual heat removal system (RNS) and service water system (SWS). The integrated performance of the safety-related and non-safety related systems ensures the safe and efficient operation of the Westinghouse SMR through various conditions and transients. The turbine island consists of the turbine, electric generator, feedwater and steam systems, moisture separation systems, and the condensers. The BOP is designed to minimize assembly time, shipping challenges, and on-site testing requirements for all structures, systems, and components. (authors)

  16. Comparison of selected DOE and non-DOE requirements, standards, and practices for Low-Level Radioactive Waste Disposal

    SciTech Connect (OSTI)

    Cole, L.; Kudera, D.; Newberry, W.

    1995-12-01

    This document results from the Secretary of Energy`s response to Defense Nuclear Facilities Safety Board Recommendation 94--2. The Secretary stated that the US Department of Energy (DOE) would ``address such issues as...the need for additional requirements, standards, and guidance on low-level radioactive waste management. `` The authors gathered information and compared DOE requirements and standards for the safety aspects Of low-level disposal with similar requirements and standards of non-DOE entities.

  17. Confined space entry program for the Westinghouse Hanford Company

    SciTech Connect (OSTI)

    Cornell, T.M.

    1993-11-01

    To comply with anticipated OSHA regulatory requirements concerning Permit-Required Confined Spaces, Westinghouse Hanford Company (WHC) created a Confined Spaces Task Team. The primary focus of the task team was to prepare a formal Confined Space Entry (CSE) Program that would ensure full compliance with the anticipated OSHA requirements. A comprehensive training plan was also prepared and submitted for approval as soon as the new CSE Program was approved and released for implementation. On January 14, 1993, OSHA released their final ruling which contained several further changes, requiring the WHC Confined Space Entry Program and Training Plan to be revised. The revised training manual and lessons learned in establishing a Confined Space Entry Program are presented.

  18. EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements...

    Energy Savers [EERE]

    1 DOE Order 413.3B EVM Requirements EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements This EVMS Training Snippet, sponsored by the Office of Project Management (PM),...

  19. Applying DOE O 414.1C and NQA-1 Requirements to ISM Software...

    Office of Environmental Management (EM)

    Applying DOE O 414.1C and NQA-1 Requirements to ISM Software Applying DOE O 414.1C and NQA-1 Requirements to ISM Software August 2009 Presenter: Norman P. Moreau, Theseus...

  20. Application of Engineering and Technical Requirements for DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Project Management for the Acquisition of Capital Assets, and DOE-STD-1189, Integration of Safety into the Design Process, for DOE Critical Decision (CD) review and approval. ...

  1. Notice of Intent to Develop DOE O 470.6, Integrating Existing Technical Security Program Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-21

    This memorandum provides justification for the development of one integrated and consolidated set of requirements for the Department of Energy (DOE) Technical Security Program (TSP). This Order will combine the existing necessary requirements from DOE Manual (M) 205.1-3, Telecommunications Security Manual, dated 4-17-2006 and DOE M 470.4-4A chg.1, Information Security Manual, dated 10-12-2010; Section D -Technical Surveillance Countermeasures, into a single DOE Order defining the DOE TSP.

  2. DOE Proposes Requirement for Certification of Admissibility for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or equipment subject to an applicable energy conservation standard provide, prior to importation, a certification of admissibility to the DOE for the covered product or equipment. ...

  3. DOE NEPA Guidance and Requirements - Search Index - List of Contents...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the NEPA Process - Interim Actions DOE2003 Administrative Record Guidance DOJ1991 Aligning the NEPA Process with EMS CEQ2007 Alternative Actions For Analysis in ...

  4. Westinghouse Completes its AP1000® Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes its AP1000® Test Stand Last June, CASL launched its first Virtual Environment for Reactor Applications (VERA) Test Stand on the Westinghouse engineering computer cluster. Westinghouse selected the AP1000® pressurized water reactor (PWR) first core for the Test Stand simulation because its advanced design and operational features, and imminent deployment in units under construction, make it a particularly relevant and engaging application of CASL technology. The Westinghouse Test

  5. Westinghouse and Fuzhou Permitted to Restart Distribution of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    conservation standard and may be sold in the United States. These 11 Westinghouse brand lamps, usually used in recessed light fixtures, correspond to 7 basic models, which are...

  6. Enforcement Letter, Westinghouse Savannah River Company- June 4, 1996

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company related to Potential Violations of the Quality Assurance and Occupational Radiation Protection Rules at the Savannah River Site

  7. Enforcement Letter, Westinghouse Hanford Corporation- July 6, 1995

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Hanford Corporation related to Radiological Work Control Deficiencies at the Plutonium Uranium Extraction Facility at the Hanford Site

  8. Enforcement Letter, Westinghouse Waste Isolation Division- October 3, 2000

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant

  9. Siemens Westinghouse Power Generation SWPG | Open Energy Information

    Open Energy Info (EERE)

    Pennsylvania Zip: PA 15235-5 Product: Siemens Westinghouse Power Generation is the fuel cell subsidiary of Siemens Power Generation. It develops and manufactures stationary...

  10. Westinghouse Earns Mine Safety Award for Exceptional Underground...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    On September 19, New Mexico State Inspector of Mines Gilbert Miera and the New Mexico Mining Association presented Westinghouse with the "Mine Operator of the Year" award. The...

  11. Westinghouse TRU Solutions LLC Earns Corporate Award for Mining...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Earns Corporate Award for Mining Operations CARLSBAD, N.M., May 3, 2001 - Washington Group International has selected Westinghouse TRU Solutions LLC (WTS) for a 2000 Eagle Award....

  12. Westinghouse TRU Solutions LLC Earns Superior Star Award for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    one priority at WIPP," said Dr. Triay. "Westinghouse has built an outstanding safety culture at WIPP and demonstrates a superior commitment to the safety and health of its...

  13. DOE Office of Science Exascale Requirements Reviews: Target 2020-2025

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Reviews: Target 2017 Requirements Reviews: Target 2014 Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Share Your Research User Submitted Research Citations NERSC Citations Home » Science at NERSC » HPC Requirements Reviews » Exascale Requirements Reviews DOE Office of Science Exascale Requirements Reviews: Target 2020-2025 Official Office of Science Computing and Data Requirements in the Exascale Age website The three DOE Office of Advanced Scientific

  14. DOE-STD-1082-94; DOE Standard Preparation, Review, and Approval of Implementaiton Plans For Nuclear Safety Requirements

    Office of Environmental Management (EM)

    82-94 October 1994 DOE STANDARD PREPARATION, REVIEW, AND APPROVAL OF IMPLEMENTATION PLANS FOR NUCLEAR SAFETY REQUIREMENTS U.S. Department of Energy AREA SAFT Washington D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615)576-8401. Available to the

  15. WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Energy Savers [EERE]

    Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy : ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the

  16. WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Energy Savers [EERE]

    Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the

  17. Review Policy / Proposal Guidelines / Reporting Requirements| U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Review Policy / Proposal Guidelines / Reporting Requirements High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management Acknowledgements of Federal

  18. DOE Order 458.1 Property Clearance Requirements and Factors Considered...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Factors Considered to Update Its Clearance Limits DOE Order 458.1 Property Clearance Requirements and Factors Considered to Update Its Clearance Limits Carlos Corredor, ...

  19. Enforcement handbook: Enforcement of DOE nuclear safety requirements

    SciTech Connect (OSTI)

    1995-06-01

    This Handbook provides detailed guidance and procedures to implement the General Statement of DOE Enforcement Policy (Enforcement Policy or Policy). A copy of this Enforcement Policy is included for ready reference in Appendix D. The guidance provided in this Handbook is qualified, however, by the admonishment to exercise discretion in determining the proper disposition of each potential enforcement action. As discussed in subsequent chapters, the Enforcement and Investigation Staff will apply a number of factors in assessing each potential enforcement situation. Enforcement sanctions are imposed in accordance with the Enforcement Policy for the purpose of promoting public and worker health and safety in the performance of activities at DOE facilities by DOE contractors (and their subcontractors and suppliers) who are indemnified under the Price-Anderson Amendments Act. These indemnified contractors, and their suppliers and subcontractors, will be referred to in this Handbook collectively as DOE contractors. It should be remembered that the purpose of the Department`s enforcement policy is to improve nuclear safety for the workers and the public, and this goal should be the prime consideration in exercising enforcement discretion.

  20. Types of Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at least two Departmental elements. The requirements identify the results needed in the performance of a job or a subject matter expert area. Details on how to fulfill...

  1. Browse Draft Directives - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  2. DOE SC Exascale Requirements Review: High Energy Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SC Exascale Requirements Review: High Energy Physics Bethesda Hyatt, June 10, 2015 Jim Siegrist Associate Director for High Energy Physics Office of Science, U.S. Department of ...

  3. Westinghouse Pays $50,000 Civil Penalty to Resolve Light Bulb...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Westinghouse Pays 50,000 Civil Penalty to Resolve Light Bulb Efficiency Violations Westinghouse Pays 50,000 Civil Penalty to Resolve Light Bulb Efficiency Violations December 13, ...

  4. DOE-HDBK-1139/3-03

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chemical Management (Volume 3 of 3) This Department of Energy Handbook was prepared under the sponsorship of the joint Department of Energy (DOE)/Energy Facility Contractors Group (EFCOG) Chemical Safety Topical Committee (CSTC). It was prepared over a span of four years by the CSTC’s Chemical User Safety and Health Requirements Roadmap team (the CUSHR team), consisting of representatives from several sites and DOE headquarters, chaired by Dr. Dave Quigley, Idaho National Engineering and Environmental Laboratory and co-chaired by Mr. James Morgan, Westinghouse Savannah River Company and Ms. Gail Kleiner, DOE/EH-52.

  5. Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-19

    The Notice establishes DOE policy requirements and responsibilities for remote connections to DOE and contractor information technology systems. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, to protect DOE information and information technology systems commensurate with the risk and magnitude of harm that could result from their unauthorized access, use, disclosure, modification or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06. No cancellations.

  6. Enforcement Guidance Supplement 99-02, DOE Enforcement Activities of Internal Dosimetry Program Requirements

    Office of Environmental Management (EM)

    EGS 99-02 Appendix E - Operational Procedures for Enforcement Department of Energy Washington, DC 20585 July 16, 1999 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson

  7. DOE Issues Request for Information for Scope Requirements Planning at Los

    Energy Savers [EERE]

    Alamos National Laboratory | Department of Energy Scope Requirements Planning at Los Alamos National Laboratory DOE Issues Request for Information for Scope Requirements Planning at Los Alamos National Laboratory December 10, 2014 - 4:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI)

  8. DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE-initiated testing has revealed that a Samsung refrigerator (model RF26VAB), which the company had claimed was Energy Star compliant, consumed more energy than permitted by the Energy Star...

  9. DOE SC Exascale Requirements Review: High Energy Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SC Exascale Requirements Review: High Energy Physics Bethesda Hyatt, June 10, 2015 Jim Siegrist Associate Director for High Energy Physics Office of Science, U.S. Department of Energy HEP Computing and Data Challenges * What's new? * In May 2014, the U.S. particle physics community updated its vision for the future - The P5 (Particle Physics Project Prioritization Panel) report presents a strategy for the next decade and beyond that enables discovery and maintains our position as a global leader

  10. DOE Order 458.1 Property Clearance Requirements and Factors Considered to

    Office of Environmental Management (EM)

    Update Its Clearance Limits | Department of Energy 58.1 Property Clearance Requirements and Factors Considered to Update Its Clearance Limits DOE Order 458.1 Property Clearance Requirements and Factors Considered to Update Its Clearance Limits Carlos Corredor, U.S. Department of Energy ;Gustavo Vasquez*, U.S. Department of Energy; Derek Favret, U.S. Department of Energy Abstract: This presentation will provide an explanation of the property clearance requirements contained in DOE O 458.1,

  11. DOE-HDBK-1163-2003; Integration of Multiple Hazard Analysis Requirements and Activities

    Office of Environmental Management (EM)

    DOE-HDBK-1163-2003 October 2003 DOE HANDBOOK INTEGRATION OF MULTIPLE HAZARD ANALYSIS REQUIREMENTS AND ACTIVITIES U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS DOE-HDBK-1163-2003 ii This document has been reproduced directly from the best available copy. It is available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301)

  12. VBR-0002- In the Matter of Westinghouse Savannah River Company

    Broader source: Energy.gov [DOE]

    This supplemental order concerns a Motion for Reconsideration (Case No. VBR-0002) filed by Westinghouse Savannah River Company (WSRC) on November 12, 1999. The reconsideration motion relates to an...

  13. LWZ-0031- In the Matter of Westinghouse Hanford Company

    Broader source: Energy.gov [DOE]

    This determination will consider a Motion to Dismiss filed by Westinghouse Hanford Company (WHC) on April 5, 1994. In its Motion, WHC seeks the dismissal of the underlying complaint and hearing...

  14. Westinghouse receives high marks for management, operation of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receives High Marks For Management, Operation of WIPP CARLSBAD, N.M., January 11, 2000 - The Westinghouse Waste Isolation Division (WID) received high marks from the U.S....

  15. Westinghouse earns top award from quality new mexico

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Earns Top Award From Quality New Mexico CARLSBAD, N.M., January 11, 2000 - The Westinghouse Waste Isolation Division led a group of three Carlsbad organizations recognized by Quality New Mexico as a recipient of the highest honor in the 1999 New Mexico Quality Awards program. Westinghouse was one of only two organizations statewide to garner the coveted Quality New Mexico Zia Award. Los Alamos National Bank was the other Zia winner. " I congratulate the leaders and employees of the

  16. Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03)

    Broader source: Energy.gov [DOE]

    Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03), 4/17/2013, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy website.

  17. Microsoft Word - Attachment J-6 List of Applicable DOE Directives and COntractor Requirements Documents.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-6-1 ATTACHMENT J.6 LIST OF APPLICABLE DOE DIRECTIVES AND CONTRACTOR REQUIREMENTS DOCUMENTS (LIST B) The following is a list of applicable DOE Directives and Orders appended to this Contract as prescribed in Section I, Clause I.3. This list is not all inclusive. Document Number Title CRD O 150.1 Continuity Programs CRD O 205.1b, Chg.3 DOE Cyber Program CRD O 206.1 DOE Privacy Program CRD O 243.1B, Admin. Chg 1. Records Management Program CRD O 414.1D, Admin Chg 1. Quality Assurance CRD O

  18. One Day Workshop/Training "Understanding DOE Quality Assurance Requirements and ASME NQA-1

    Office of Environmental Management (EM)

    4, 2015 One Day Workshop/Training "Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects" 8 th floor, CNF-AR-Franklin-Center Main 950 L'Enfant Plaza Time Discussion/Activity Speaker/Presenter 8:15 am - 8:30 am Opening/Introductions/Learning Objectives Ruben Sanchez, MA-63 8:30 am - 9:00 am Highlights Bud Danielson, CNS 9:00 am - 9:30 am Overview of DOE QA Regulatory Framework Rules, Directives, and Standards Requirements, Program

  19. Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP)

    Broader source: Energy.gov [DOE]

    This Standard Review Plan (SRP), Application of Engineering and Technical Requirements for DOE Nuclear Facilities, was developed by the Chief of Nuclear Safety (CNS)1, Office of the Under Secretary for Nuclear Security, to help strengthen the technical rigor of line management oversight and federal monitoring of DOE nuclear facilities. This SRP (hereafter refers to as the Engineering SRP) provides consistent review guidance to assure that engineering and technical requirements are appropriately applied for the design, operations and disposition2 of DOE nuclear facilities. It is one of a series of three SRPs developed by the CNS. The other two SRPs address: 1) nuclear safety basis program review; and 2) application of requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, and DOE-STD-1189, Integration of Safety into the Design Process, for DOE Critical Decision (CD) review and approval. These SRPs may be revised in the future to reflect changes in the DOE requirements, lessons learned, and experience/insights from nuclear facility design, operations, and disposition.

  20. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  1. Westinghouse Again Recognized For Safe Underground Operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and operating contractor for DOE at WIPP. The company's underground operations include mining, hoisting, maintenance, engineering and other related activities. The Certificate of...

  2. TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements

    SciTech Connect (OSTI)

    Alan Bond

    2001-04-01

    This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

  3. EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements | Department

    Office of Environmental Management (EM)

    of Energy 1 DOE Order 413.3B EVM Requirements EVMS Training Snippet: 1.1 DOE Order 413.3B EVM Requirements This EVMS Training Snippet, sponsored by the Office of Project Management (PM), covers the Department of Energy's policy relative to Earned Value Management. Link to Video Presentation | Prior Snippet | Next Snippet (1.2) | Return to Index PDF icon Slides Only PDF icon Slides with Notes More Documents & Publications EVMS Training Snippet: 1.3 EVMS Stage 1 Surveillance EVMS Training

  4. Microsoft Word - SRP on Application of Engineering and Technical Requirements to DOE Nuclear Facilities_Projects_CNS_Draft Fina

    Office of Environmental Management (EM)

    Final for DOE Peer Review - December 28, 2012 1 Standard Review Plan Application of Engineering and Technical Requirements for DOE Nuclear Facilities Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities and Projects Draft Final for DOE Peer Review- December 28, 2012 Draft Final for DOE Peer Review - December 28, 2012 2 Table of Contents Objective

  5. Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402

    SciTech Connect (OSTI)

    Chakraborti, Sayan; Stone, Lynn; Hyatt, Jeannette

    2013-07-01

    Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the Environmental Report is being evaluated at the Savannah River Site as a case study for application across the DOE Complex. This paper will present areas of direct correlation as well as those where the need for site specific data for either DOE operations or NRC compliance warrant additional interaction between the agencies. Areas where further refinement of the SMR technologies may drive collaborative development of revised regulations through such means as industry consensus standards will also be highlighted. Both NRC and DOE have requirements that mandate public involvement in their processes. The importance and value of early engagement with the public as well as collaborating regulatory agencies is of critical importance when deploying new technologies. (authors)

  6. DOE Requires Manufacturers to Halt Sales of Heat Pumps and Air Conditioners

    Energy Savers [EERE]

    Violating Minimum Appliance Standards | Department of Energy Requires Manufacturers to Halt Sales of Heat Pumps and Air Conditioners Violating Minimum Appliance Standards DOE Requires Manufacturers to Halt Sales of Heat Pumps and Air Conditioners Violating Minimum Appliance Standards June 3, 2010 - 12:00am Addthis Washington, DC - Today, the Department of Energy announced that three manufacturers -- Aspen Manufacturing, Inc., Summit Manufacturing, and Advanced Distributor Products -- must

  7. DOE Requires Air-Con International to Cease Sales of Inefficient Air

    Office of Environmental Management (EM)

    Conditioners and Proposes Penalties | Department of Energy Air-Con International to Cease Sales of Inefficient Air Conditioners and Proposes Penalties DOE Requires Air-Con International to Cease Sales of Inefficient Air Conditioners and Proposes Penalties September 21, 2010 - 6:43pm Addthis The Department has issued a Notice of Noncompliance Determination and Proposed Civil Penalty to Air-Con, International, requiring Air-Con to cease the sale of certain air-conditioning systems in the

  8. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2000-02

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company, related to Procurement Quality Assurance and Quality Improvement Deficiencies at the Savannah River Site.

  9. EXC-12-0011 - In the Matter of Westinghouse Lighting Corporation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1 - In the Matter of Westinghouse Lighting Corporation EXC-12-0011 - In the Matter of Westinghouse Lighting Corporation On September 17, 2012, OHA issued a decision granting an Application for Exception filed by Westinghouse Lighting Corporation (Westinghouse) for relief from the provisions of 10 C.F.R. Part 430, Energy Conservation Program: Energy Conservation Standards and Test Procedures for General Service Fluorescent Lamps and Incandescent Reflector Lamps (Lighting

  10. Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order establishes selection, training, qualification, and certification requirements for contractor personnel who can impact the safety basis through their involvement in the operation, maintenance, and technical support of Hazard Category 1, 2, and 3 nuclear facilities. Cancels DOE O 5480.20A. Admin Chg 1, dated 7-29-13.

  11. Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order establishes selection, training, qualification, and certification requirements for contractor personnel who can impact the safety basis through their involvement in the operation, maintenance, and technical support of Hazard Category 1, 2, and 3 nuclear facilities. Admin Chg 1, dated 7-29-13, supersedes DOE O 426.2.

  12. DOE's General Counsel Announces New Policy Requiring Online Posting of NEPA Categorical Exclusion Determinations to Further Transparency

    Broader source: Energy.gov [DOE]

    Washington, DC - Consistent with the President's commitment to "disclose information rapidly in forms that the public can readily find and use," DOE announced today a new policy requiring all DOE...

  13. DOE Requires Manufacturers to Halt Sales of Heat Pumps and Air Conditioners

    Office of Environmental Management (EM)

    Violating Minimum Appliance Standards | Department of Energy Manufacturers to Halt Sales of Heat Pumps and Air Conditioners Violating Minimum Appliance Standards DOE Requires Manufacturers to Halt Sales of Heat Pumps and Air Conditioners Violating Minimum Appliance Standards June 3, 2010 - 2:17pm Addthis Today, the Department of Energy announced that three manufacturers -- Aspen Manufacturing, Inc., Summit Manufacturing, and Advanced Distributor Products -- must stop distributing 61 heat

  14. Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in its enforcement activities. The focus of this enforcement guidance clarifies internal dosimetry program requirements identified by the Department of Energys nuclear safety requirements in 10 CFR 835 (Occupational Radiation Protection Programs) and 10 CFR 830.120 (Quality Assurance Requirements). To develop the enforcement guidance, EH Enforcement convened a DOE working group which included representatives from the Field Office elements and the Office of Worker Protection Programs and Hazards Management, which is the office responsible for the content and technical clarifications of 10 CFR 835. The guide discusses the following areas: (1) prospective determination of employees that are likely to receive 100 millirem (mrem) or greater per 10 CFR 835.402, (Individual Monitoring); (2) application of enforcement policy in taking credit for respiratory protection in prospective determinations; (3) use of contractors policies regarding personnel internal exposure to radioactive material; (4) As Low As Reasonably Achievable (ALARA) programs; (5) clarification of enforcement with regard to internal dosimetry programs; and Final Comments.

  15. DOE nuclear material packaging manual: storage container requirements for plutonium oxide materials

    SciTech Connect (OSTI)

    Veirs, D Kirk

    2009-01-01

    Loss of containment of nuclear material stored in containers such as food-pack cans, paint cans, or taped slip lid cans has generated concern about packaging requirements for interim storage of nuclear materials in working facilities such as the plutonium facility at Los Alamos National Laboratory (LANL). In response, DOE has recently issued DOE M 441.1 'Nuclear Material Packaging Manual' with encouragement from the Defense Nuclear Facilities Safety Board. A unique feature compared to transportation containers is the allowance of filters to vent flammable gases during storage. Defining commonly used concepts such as maximum allowable working pressure and He leak rate criteria become problematic when considering vented containers. Los Alamos has developed a set of container requirements that are in compliance with 441.1 based upon the activity of heat-source plutonium (90% Pu-238) oxide, which bounds the requirements for weapons-grade plutonium oxide. The pre and post drop-test He leak rates depend upon container size as well as the material contents. For containers that are routinely handled, ease of handling and weight are a major consideration. Relatively thin-walled containers with flat bottoms are desired yet they cannot be He leak tested at a differential pressure of one atmosphere due to the potential for plastic deformation of the flat bottom during testing. The He leak rates and He leak testing configuration for containers designed for plutonium bearing materials will be presented. The approach to meeting the other manual requirements such as corrosion and thermal degradation resistance will be addressed. The information presented can be used by other sites to evaluate if their conditions are bounded by LANL requirements when considering procurement of 441.1 compliant containers.

  16. DOE-HDBK-1139/3-2003; Chemical Management (Volume 3 of 3) Consolidated Chemical User Safety and Health Requirements

    Office of Environmental Management (EM)

    TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1139/3-2003 DOE HANDBOOK CHEMICAL MANAGEMENT (Volume 3 of 3) Consolidated Chemical User Safety and Health Requirements U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. September 2003 DOE-HDBK-1139/3-2003 This document has been reproduced directly from the best available copy. It is available to DOE and DOE contractors from ES&H Technical Information Services, U.S.

  17. Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products

    Broader source: Energy.gov [DOE]

    The Department has issued Notices of Allowance to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company determining, based on corrected test data provided by...

  18. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-2000-08

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company, related to Unplanned Exposures and Radioactive Material Intakes at the Savannah River Site (EA-2000-08)

  19. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA 98-09

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09)

  20. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA-97-12

    Broader source: Energy.gov [DOE]

    Issued to Westinghouse Savannah River Company, related to an Unplanned Radioactive Material Intake at the Savannah River Site, (EA-97-12)

  1. Westinghouse Completes its AP1000 Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Completes its AP1000 Test Stand  VERA-CS Coupled Multi-physics Capability demonstrated in a Full-core Simulation  TVA provides Watts Bar Operating Data to Support Validation of CASL Tools  University of Michigan adds Depletion Capability to MPACT for VERA-CS  VERA Data Transfer Processes Provided by DTK  Alternate Coupling Algorithm Investigations Completed  Role of HPC in the Nuclear Power Industry  TVA Test Stand Launched November 2013 Volume 1, Issue 4

  2. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE REporting requirements_presentations_4-29-14.ppt [Compatibility M

    National Nuclear Security Administration (NNSA)

    Overview of DOE and NRC Reporting to NMMSS Similarities, Differences, and Challenges John Ballard, DOE Reconciliation Mary McConnell, NRC Reconciliation LINK Technologies Reporting to NMMSS Regulatory Compliance DOE Reporting Requirements NRC Reporting Requirements Resources 2 Regulatory Compliance DOE regulatory questions? - Contact Pete Dessaules DOE NMMSS Program Manager 301-903-4525 pete.dessaules@nnsa.doe.gov NRC regulatory questions? - Contact Brian Horn NRC NMMSS Program Manager

  3. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    SciTech Connect (OSTI)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview of the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.

  4. "Order Module--DOE O 426.2, PERSONNEL SELECTION, TRAINING, QUALIFICATION, AND CERTIFICATION REQUIREMENTS FOR DOE NUCLEAR FACILITIES

    Broader source: Energy.gov [DOE]

    "To establish selection, training, qualification, and certification requirements for contractor personnel who can impact the safety basis through their involvement in the operation, maintenance,...

  5. Westinghouse 100 kWe SOFC demonstration status

    SciTech Connect (OSTI)

    Veyo, S.

    1996-12-31

    The world`s first 100 kWe class Solid Oxide Fuel Cell (SOFC) power generation system is being supplied by Westinghouse and is sponsored by EDB/ELSAM, a consortium of Dutch and Danish utilities. This natural gas fueled experimental field unit will be installed near Arnhem, The Netherlands, at an auxiliary district heating plant. The module utilizes tubular Air Electrode Supported SOFCs. The system will achieve an electrical generation efficiency of 49%, and this combined with recovery of heat for district heating can yield an overall fuel effectiveness approaching 80%. Significant progress toward reduction of CO{sub 2}, a greenhouse gas, will be obtained, and the system will be environmentally benign.

  6. DOE-STD-1033-92; Guide to Good Practices for Operations and Administration Updates Through Required Reading

    Office of Environmental Management (EM)

    3-92 December 1992 CHANGE NOTICE NO.1 December 1998 DOE STANDARD GUIDE TO GOOD PRACTICES FOR OPERATIONS AND ADMINISTRATION UPDATES THROUGH REQUIRED READING U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301)

  7. DOE Requires Manufacturers to Halt Sales of Heat Pumps and Air...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributor Products -- must stop distributing 61 heat pump models and 1 air conditioner model that DOE has determined do not comply with federal energy conservation standards. ...

  8. Westinghouse Waste Simulation and Optimization Software Tool - 13493

    SciTech Connect (OSTI)

    Mennicken, Kim [Westinghouse Electric Germany GmbH, Global Waste Management, Dudenstrasse 44, D-68167 Mannheim (Germany)] [Westinghouse Electric Germany GmbH, Global Waste Management, Dudenstrasse 44, D-68167 Mannheim (Germany); Aign, Joerg [Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D-22419 Hamburg (Germany)] [Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D-22419 Hamburg (Germany)

    2013-07-01

    Radioactive waste is produced during NPP operation and NPP D and D. Different kinds of waste with different volumes and properties have to be treated. Finding a technically and commercially optimized waste treatment concept is a difficult and time consuming process. The Westinghouse waste simulation and optimization software tool is an approach to study the total life cycle cost of any waste management facility. The tool enables the user of the simulation and optimization software to plan processes and storage buildings and to identify bottlenecks in the overall waste management design before starting detailed planning activities. Furthermore, application of the software enables the user to optimize the number of treatment systems, to determine the minimum design capacity for onsite storage facilities, to identify bottlenecks in the overall design and to identify the most cost-effective treatment paths by maintaining optimal waste treatment technologies. In combination with proven waste treatment equipment and integrated waste management solutions, the waste simulation and optimization software provides reliable qualitative results that lead to an effective planning and minimization of the total project planning risk of any waste management activity. (authors)

  9. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy PLEASE KEEP THIS PAHPHLET WITH YOU DURING YOUR VISIT Welcome to the Hanford Site Visitor Orientation 2 We take safety, security, and environmental protection seriously The safety and health of our employ- ees, the public, and those who visit the Hanford Site, in addition to site security and protection of the envi- ronment, are fundamental values of the U.S. Department of Energy (DOE) and its contractors. We strive to achieve and sustain a worksite that is free of

  10. Suspect/Counterfeit Items Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1B, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-11-03

    This Guide provides guidance to assist DOE/NNSA and its contractors in mitigating the safety threat of suspect/counterfeit items (S/CIs). Cancels DOE G 440.1-6, Implementation Guide for use with Suspect/Counterfeit Items Requirements of DOE O 440.1, Worker Protection Management; 10 CFR 830.120; and DOE O 5700.6C, Quality Assurance, dated 6-30-97. Canceled by DOE G 414.1-2B.

  11. Age-related degradation of Westinghouse 480-volt circuit breakers

    SciTech Connect (OSTI)

    Subudhi, M.; Shier, W.; MacDougall, E. )

    1990-07-01

    An aging assessment of Westinghouse DS-series low-voltage air circuit breakers was performed as part of the Nuclear Plant Aging Research (NPAR) program. The objectives of this study are to characterize age-related degradation within the breaker assembly and to identify maintenance practices to mitigate their effect. Since this study has been promulgated by the failures of the reactor trip breakers at the McGuire Nuclear Station in July 1987, results relating to the welds in the breaker pole lever welds are also discussed. The design and operation of DS-206 and DS-416 breakers were reviewed. Failure data from various national data bases were analyzed to identify the predominant failure modes, causes, and mechanisms. Additional operating experiences from one nuclear station and two industrial breaker-service companies were obtained to develop aging trends of various subcomponents. The responses of the utilities to the NRC Bulletin 88-01, which discusses the center pole lever welds, were analyzed to assess the final resolution of failures of welds in the reactor trips. Maintenance recommendations, made by the manufacturer to mitigate age-related degradation were reviewed, and recommendations for improving the monitoring of age-related degradation are discussed. As described in Volume 2 of this NUREG, the results from a test program to assess degradation in breaker parts through mechanical cycling are also included. The testing has characterized the cracking of center-pole lever welds, identified monitoring techniques to determine aging in breakers, and provided information to augment existing maintenance programs. Recommendations to improve breaker reliability using effective maintenance, testing, and inspection programs are suggested. 13 refs., 21 figs., 8 tabs.

  12. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management

  13. Guidance on meeting DOE order requirements for traceable nondestructive assay measurements

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    Purpose of this guide is to facilitate accuracy and precision of nondestructive assay measurements through improvement of the materials and process of traceability. This document provides DOE and its contractor facilities with guidance to establish traceability to the national measurement base for site-prepared NDA working reference materials.

  14. Microsoft PowerPoint - Snippet 1.1 DOE O 413.3B EVM Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    requirements and leading practices for project and acquisition management. The Order applies to capital asset acquisition projects with a Total Project Cost greater than or equal ...

  15. Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377

    Office of Environmental Management (EM)

    IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five

  16. DOE G 423.1-1B, Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides a complete description of what Technical Safety Requirements should contain and how they should be developed and maintained. This revision of the guide provides new guidance on Technical Safety Requirements for Specific Administrative Controls, incorporates and addresses lessons learned, and makes clarifications and organization changes to improve usability.

  17. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Biological and Environmental Research (BER) BER Home About Research Facilities Science Highlights Benefits of BER Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Peer Review Policy Grants & Contracts Guidance Laboratory Scientific Focus Area

  18. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Fusion Energy Sciences (FES) FES Home About Research Facilities Science Highlights Benefits of FES Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Fusion Energy Sciences Advisory Committee (FESAC) Community Resources Contact Information Fusion

  19. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Reviews NP Early Career Opportunities Nuclear Science Advisory Committee (NSAC) Community Resources Contact

  20. DOE-STD-1104-96 CN-1; Review and Approval of Nuclear Facility Safety Basis Documents (Documented Safety Analyses and Technical Safety Requirements)

    Office of Environmental Management (EM)

    DOE-STD-1104-96 February 1996 CHANGE NOTICE NO. 1 May 2002 DOE STANDARD REVIEW AND APPROVAL OF NUCLEAR FACILITY SAFETY BASIS DOCUMENTS (DOCUMENTED SAFETY ANALYSES AND TECHNICAL SAFETY REQUIREMENTS) U.S. Department of Energy AREA SAFT Washington, DC 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services,

  1. DOE Requires Air-Con International to Cease Sales of Inefficient...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Civil Penalty to Air-Con, International, requiring Air-Con to cease the sale of certain air-conditioning systems in the United States and proposing a civil penalty of ...

  2. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management 2013 Exascale Operating and Runtime Systems RX-Solvers FAQ 2015 EXPRESS FAQ .pdf

  3. Best Seller Cites Westinghouse Safety Culture at WIPP as "World-Wide Standard"

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Best Seller Cites Westinghouse Safety Culture at WIPP As "World-Wide Standard" CARLSBAD, N.M., October 23, 2001 -- A best-selling business book recognizes the safety culture created by Westinghouse at the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico, as "the worldwide standard for safety practices." The book, originally published by Linkage Press of Lexington, Massachusetts, as Linkage Inc.'s Best Practices in Organization

  4. L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review Andrew Godfrey ORNL Completed: June 25, 2013 CASL-8-2013-01 -000 D Consortium for Advanced Simulation of LWRs Consortium for Advanced Simulation of Light Water Reactors Bldg. 5700, Room E309, MS 6003 P.O. Box 2008 Oak Ridge, TN 37831-6003 Email: casl-info@ornl.gov Date: 6/25/2013 To: Jess Gehin c: Erik Walker, Mark Baird, From: Andrew Godfrey Subject: Westinghouse Test Stand Technical Readiness Review Jess, I have completed a

  5. CASL-U-2015-0132-000 Fausto Franceschini Westinghouse Electric Co. LLC,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    32-000 Fausto Franceschini Westinghouse Electric Co. LLC, March 26, 2015 AP1000 ® PWR Startup Core Modeling and Simulation with VERA-CS CASL-U-2015-0132-000 F Advances in Nuclear Fuel Management V (ANFM 2015) Hilton Head Island, South Carolina, USA, March 29 - April 1, 2015, on CD-ROM, American Nuclear Society, LaGrange Park, IL (2015) © 2015 Westinghouse Electric Company LLC. All Rights Reserved. p. 1/12 AP1000 ® PWR STARTUP CORE MODELING AND SIMULATION WITH VERA-CS F. Franceschini

  6. Notice of Intent to Revise Department of Energy Order 426.2 Change 1, Personnel Selection, Training, Qualification and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Office of Nuclear Safety consulted field and Headquarters (HQ) offices on whether or not a revision is warranted for DOE O 426.2. As a result, certain aspects of DOE O 426.2 were identified as needing clarification and revision. Based on this feedback, the revision is intended to clarify educational requirements, certification requirements, and applicability. Addressing these concerns should improve operating training programs, and result in less time focused on managing ambiguous or possibly unnecessary requirements.

  7. Notice of Intent to Revise Department of Energy Order 426.2 Change 1, Personnel Selection, Training, Qualification and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-02-19

    The Office of Nuclear Safety consulted field and Headquarters (HQ) offices on whether or not a revision is warranted for DOE O 426.2. As a result, certain aspects of DOE O 426.2 were identified as needing clarification and revision. Based on this feedback, the revision is intended to clarify educational requirements, certification requirements, and applicability. Addressing these concerns should improve operating training programs, and result in less time focused on managing ambiguous or possibly unnecessary requirements.

  8. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    SciTech Connect (OSTI)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

  9. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA 2004-03

    Broader source: Energy.gov [DOE]

    This letter refers to the Department of Energy’s Office of Price-Anderson Enforcement (OE) investigation of the facts and circumstances concerning the unnecessary radiation exposure of three Westinghouse Savannah River Company (WSRC) personnel and the subsequent falsification of radiation dose

  10. DOE, Westinghouse to Partner with NMJC To Train Radiological and Waste Handling Technicians

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Partner with NMJC To Train Radiological and Waste Handling Technicians Hobbs, NM, December 5, 2001 -- Representatives of the Waste Isolation Pilot Plant (WIPP) yesterday presented a check for $70,000 to New Mexico Junior College (NMJC) to initiate a new program to train and certify radiological and waste handling technicians. Dr. Steve McCleery, President of NMJC, accepted the check from Dr. Chuan-Fu Wu, Senior Technical Advisor for the U.S. Department of Energy's Carlsbad Field Office, and

  11. Supplemental Requirements for the Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-19

    The Notice supplements review and approval requirements of DOE O 350.2A, Use of Management and Operating (M&O) or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area, dated 10-29-03.

  12. Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Guide provides information on principles and practices used to establish and implement an effective quality assurance program or quality management system in accordance with the requirements of 10 CFR 830. Cancels DOE G 414.1-2. Canceled by DOE G 414.1-2B.

  13. Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Guide provides acceptable methods for implementing the safety software quality assurance requirements of draft DOE O 414.1C, Quality Assurance. Certified 11-3-10. No cancellation.

  14. Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Certificate in Renewable Energy and the Environment Requirements Earn this certificate by completing a total of 11 points from the following categories: Courses (minimum 4 points) For more information about courses, contact Erin Plut (eplut@wustl.edu) 100 - 200 Level Course Earn 1 point Receive a grade of B- or better in a 2.00 or 3.00 unit course 300 - 400 Level Course Earn 2 points Receive a grade of C or better in a 2.00 or more unit course Independent Study Earn 3 points Students may arrange

  15. Evolution of Westinghouse heavy-duty power generation and industrial combustion turbines

    SciTech Connect (OSTI)

    Scalzo, A.J.; Bannister, R.L.; DeCorso, M.; Howard, G.S.

    1996-04-01

    This paper reviews the evolution of heavy-duty power generation and industrial combustion turbines in the United States from a Westinghouse Electric Corporation perspective. Westinghouse combustion turbine genealogy began in March of 1943 when the first wholly American designed and manufactured jet engine went on test in Philadelphia, and continues today in Orlando, Florida, with the 230 MW, 501G combustion turbine. In this paper, advances in thermodynamics, materials, cooling, and unit size will be described. Many basic design features such as two-bearing rotor, cold-end drive, can-annular internal combustors, CURVIC{sup 2} clutched turbine disks, and tangential exhaust struts have endured successfully for over 40 years. Progress in turbine technology includes the clean coal technology and advanced turbine systems initiatives of the US Department of Energy.

  16. Westinghouse Small Modular Reactor passive safety system response to postulated events

    SciTech Connect (OSTI)

    Smith, M. C.; Wright, R. F. [Westinghouse Electric Company, 600 Cranberry Woods Drive (United States)

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor. This paper is part of a series of four describing the design and safety features of the Westinghouse SMR. This paper focuses in particular upon the passive safety features and the safety system response of the Westinghouse SMR. The Westinghouse SMR design incorporates many features to minimize the effects of, and in some cases eliminates the possibility of postulated accidents. The small size of the reactor and the low power density limits the potential consequences of an accident relative to a large plant. The integral design eliminates large loop piping, which significantly reduces the flow area of postulated loss of coolant accidents (LOCAs). The Westinghouse SMR containment is a high-pressure, compact design that normally operates at a partial vacuum. This facilitates heat removal from the containment during LOCA events. The containment is submerged in water which also aides the heat removal and provides an additional radionuclide filter. The Westinghouse SMR safety system design is passive, is based largely on the passive safety systems used in the AP1000{sup R} reactor, and provides mitigation of all design basis accidents without the need for AC electrical power for a period of seven days. Frequent faults, such as reactivity insertion events and loss of power events, are protected by first shutting down the nuclear reaction by inserting control rods, then providing cold, borated water through a passive, buoyancy-driven flow. Decay heat removal is provided using a layered approach that includes the passive removal of heat by the steam drum and independent passive heat removal system that transfers heat from the primary system to the environment. Less frequent faults such as loss of coolant accidents are mitigated by passive injection of a large quantity of water that is readily available inside containment. An automatic depressurization system is used to reduce the reactor pressure in a controlled manner to facilitate the passive injection. Long-term decay heat removal is accomplished using the passive heat removal systems augmented by heat transfer through the containment vessel to the environment. The passive injection systems are designed so that the fuel remains covered and effectively cooled throughout the event. Like during the frequent faults, the passive systems provide effective cooling without the need for ac power for seven days following the accident. Connections are available to add additional water to indefinitely cool the plant. The response of the safety systems of the Westinghouse SMR to various initiating faults has been examined. Among them, two accidents; an extended station blackout event, and a LOCA event have been evaluated to demonstrate how the plant will remain safe in the unlikely event that either should occur. (authors)

  17. Final evaluation report for Westinghouse Hanford Company, WRAP-1,208 liter waste drum, docket 94-35-7A, type A packaging

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-06-12

    This report documents the U.S. Department of Transportation Specification 7A Type A (DOT-7A) compliance test results of the Westinghouse Hanford Company, Waste Receiving and Processing Facility, Module 1 (WRAP-1) Drum. The WRAP-1 Drum was tested for DOE-HQ in August 1994, by Los Alamos National Laboratory, under docket number 94-35-7A. Additionally, comparison and evaluation of the approved, as-tested packaging configuration was performed by WHC in September 1995. The WRAP-1 Drum was evaluated against the performance of the DOT-17C, 208 1 (55-gal) steel drums tested and evaluated under dockets 89-13-7A/90-18-7A and 94-37-7A.

  18. DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm Addthis...

  19. Quantifying and Addressing the DOE Material Reactivity Requirements with Analysis and Testing of Hydrogen Storage Materials & Systems

    SciTech Connect (OSTI)

    Khalil, Y. F

    2015-01-05

    The objective of this project is to examine safety aspects of candidate hydrogen storage materials and systems being developed in the DOE Hydrogen Program. As a result of this effort, the general DOE safety target will be given useful meaning by establishing a link between the characteristics of new storage materials and the satisfaction of safety criteria. This will be accomplished through the development and application of formal risk analysis methods, standardized materials testing, chemical reactivity characterization, novel risk mitigation approaches and subscale system demonstration. The project also will collaborate with other DOE and international activities in materials based hydrogen storage safety to provide a larger, highly coordinated effort.

  20. Westinghouse P.O. Box 1970 Hanford COlTlpany Richland, Washington 99352

    Office of Scientific and Technical Information (OSTI)

    Westinghouse P.O. Box 1970 Hanford COlTlpany Richland, Washington 99352 Hanford Operations and Engineering Contractor for the U S . Department of Energy under Contract DE-AC06-87RL10930 Approved for Public Release o-vrrorr 91: WHC-MR-0293 Revision 2 _-- Legend and Legacy: Fifty Years of Defense Production at the Hanford Site M. S. Gerber Date Published September 1992 Prepared for the U.S. Department of Energy Office of Environmental Restoration and Waste Manage men t 3 e f e r e n c e WHC-c:

  1. Westinghouse Offers $6,400 in College Scholarships to Eddy County Students

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Offers $6,400 in College Scholarships to Eddy County Students CARLSBAD, N.M., February 18, 2000 - The Westinghouse Government Services Group today announced that $6,400 in college scholarships will be awarded to Eddy County students for the 2000-2001 school year. The deadline to apply is April 3. Two $2,500 scholarships are being offered - one will be honored at New Mexico State University (NMSU) in Las Cruces, and one at the College of the Southwest (CSW) in Carlsbad. High school seniors

  2. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  3. Test Plan for Westinghouse Hanford Company`s Hedgehog Shielded Container, Docket 94-39-7A, Type A Container

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-02-27

    This report documents the US Department of Transportation Specification 7A Type A (DOT-7A) compliance testing to be followed for qualification of the Westinghouse Hanford Company`s Hedgehog Shielded Container for use as a Type A packaging. The packaging configurations being tested are intended for liquids and solids, and for air transportation.

  4. Assessment of ISLOCA risk: Methodology and application to a Westinghouse four-loop ice condenser plant

    SciTech Connect (OSTI)

    Kelly, D.L.; Auflick, J.L.; Haney, L.N.

    1992-04-01

    Inter-system loss-of-coolant accidents (ISLOCAs) have been identified as important contributors to offsite risk for some nuclear power plants. A methodology has been developed for identifying and evaluating plant-specific hardware designs, human factors issues, and accident consequence factors relevant to the estimation of ISLOCA core damage frequency and risk. This report presents a detailed description of the application of this analysis methodology to a Westinghouse four-loop ice condenser plant. This document also includes appendices A through I which provide: System descriptions; ISLOCA event trees; human reliability analysis; thermal hydraulic analysis; core uncovery timing calculations; calculation of system rupture probability; ISLOCA consequences analysis; uncertainty analysis; and component failure analysis.

  5. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    SciTech Connect (OSTI)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  6. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  7. Does the orbit-averaged theory require a scale separation between periodic orbit size and perturbation correlation length?

    SciTech Connect (OSTI)

    Zhang, Wenlu; Department of Modern Physics, University of Science and Technology of China, Hefei, Anhui 230026; Department of Physics and Astronomy, University of California, Irvine, California 92697 ; Lin, Zhihong; Fusion Simulation Center, Peking University, Beijing 100871

    2013-10-15

    Using the canonical perturbation theory, we show that the orbit-averaged theory only requires a time-scale separation between equilibrium and perturbed motions and verifies the widely accepted notion that orbit averaging effects greatly reduce the microturbulent transport of energetic particles in a tokamak. Therefore, a recent claim [Hauff and Jenko, Phys. Rev. Lett. 102, 075004 (2009); Jenko et al., ibid. 107, 239502 (2011)] stating that the orbit-averaged theory requires a scale separation between equilibrium orbit size and perturbation correlation length is erroneous.

  8. DOE-FLEX: DOE's Telework Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-02-11

    The order establishes the requirements and responsibilities for the Departments telework program. Supersedes DOE N 314.1.

  9. Comparison and Analysis of Regulatory and Derived Requirements for Certain DOE Spent Nuclear Fuel Shipments; Lessons Learned for Future Spent Fuel Transportation Campaigns

    SciTech Connect (OSTI)

    Kramer, George L., Ph.D.; Fawcett, Rick L.; Rieke, Philip C.

    2003-02-27

    Radioactive materials transportation is stringently regulated by the Department of Transportation and the Nuclear Regulatory Commission to protect the public and the environment. As a Federal agency, however, the U.S. Department of Energy (DOE) must seek State, Tribal and local input on safety issues for certain transportation activities. This interaction has invariably resulted in the imposition of extra-regulatory requirements, greatly increasing transportation costs and delaying schedules while not significantly enhancing the level of safety. This paper discusses the results an analysis of the regulatory and negotiated requirements established for a July 1998 shipment of spent nuclear fuel from foreign countries through the west coast to the Idaho National Engineering and Environmental Laboratory (INEEL). Staff from the INEEL Nuclear Materials Engineering and Disposition Department undertook the analysis in partnership with HMTC, to discover if there were instances where requirements derived from stakeholder interactions duplicate, contradict, or otherwise overlap with regulatory requirements. The study exhaustively lists and classifies applicable Department of Transportation (DOT) and Nuclear Regulatory Commission (NRC) regulations. These are then compared with a similarly classified list of requirements from the Environmental Impact Statements (EIS) and those developed during stakeholder negotiations. Comparison and analysis reveals numerous attempts to reduce transportation risk by imposing more stringent safety measures than those required by DOT and NRC. These usually took the form of additional inspection, notification and planning requirements. There are also many instances of overlap with, and duplication of regulations. Participants will gain a greater appreciation for the need to understand the risk-oriented basis of the radioactive materials regulations and their effectiveness in ensuring safety when negotiating extra-regulatory requirements.

  10. Implementation of the Clean Air Act, Title III, Section 112(r) Prevention of Accidental Release Rule requirements at U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.; Fellers, H.L. [Lockheed-Martin Energy Systems K-25 Site, Oak Ridge, TN (United States)

    1997-12-31

    Title III, Section 112(r) of the Clean Air Act (CAA) Amendments of 1990 requires the Environmental Protection Agency (EPA) to promulgate regulations to prevent accidental releases of regulated substances and to reduce the severity of those releases that do occur. The final EPA rule for Risk Management Programs under Section 112(r)(7) of the CAA, promulgated June 20, 1996, applies to all stationary sources with processes that contain more than a threshold quantity of any of 139 regulated substances listed under 40 CFR 68.130. All affected sources will be required to prepare a risk management plan which must be submitted to EPA and be made available to state and local governments and to the public. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of the Prevention of Accidental Release Rule. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the K-25 Site. The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the K-25 Site conducts a variety of research and development activities and is the home of a mixed waste incinerator. ORR activities underway and soon to be undertaken toward implementation of the Prevention of Accidental Release Rule include: compilation of inventories of regulated substances at all processes at each of the three ORR Facilities for determination of affected processes and facilities; plans for inventory reduction to levels below threshold quantities, where necessary and feasible; determination of the overlap of processes subject to the OSHA PSM Standard and determination of parallel requirements; preparation of Risk Management Plans and Programs for affected processes and facilities including detailed requirements for hazard assessment, prevention, and emergency response.

  11. Other Requirements - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assurance WT - Office of Industrial Relations Issue Date Start date End date Signatory Clay Sell Daniel B. Poneman Ernest J. Moniz None Owen F. Barwell, Acting Chief Financial...

  12. DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY

    Office of Legacy Management (LM)

    DOE ORDER 5480.14, PHASE I - INSTALLATION ASSESSMENT FOR THE BETTIS ATOMIC POWER LABORATORY Prepared for the U.S. Department of Energy by Westinghouse Electric Corporation West Mifflin, Pennsylvania 15122-0079 i' Vendor Contract Number: DE-ACll-76PN00014 : IAELE OF CONTENTS I. Executive Summary ............................................. 2. Introduction .................................................. a. Background......;.........................................i b. Authority

  13. Radioactive waste shipments to Hanford retrievable storage from Westinghouse Advanced Reactors and Nuclear Fuels Divisions, Cheswick, Pennsylvania

    SciTech Connect (OSTI)

    Duncan, D.; Pottmeyer, J.A.; Weyns, M.I.; Dicenso, K.D.; DeLorenzo, D.S.

    1994-04-01

    During the next two decades the transuranic (TRU) waste now stored in the burial trenches and storage facilities at the Hanford Sits in southeastern Washington State is to be retrieved, processed at the Waste Receiving and Processing Facility, and shipped to the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico for final disposal. Approximately 5.7 percent of the TRU waste to be retrieved for shipment to WIPP was generated by the decontamination and decommissioning (D&D) of the Westinghouse Advanced Reactors Division (WARD) and the Westinghouse Nuclear Fuels Division (WNFD) in Cheswick, Pennsylvania and shipped to the Hanford Sits for storage. This report characterizes these radioactive solid wastes using process knowledge, existing records, and oral history interviews.

  14. Microsoft Word - 1aDOE-ID-12-047 Westinghouse EC B3-6 NRC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    would be viable on a larger scale and suitable for commercial development. MIT NRC License R-37 Texas A&M NRC License 42-09082-09 Justification: The activity consists of...

  15. The Westinghouse solid oxide fuel cell program: Clean, efficient energy for the future

    SciTech Connect (OSTI)

    Gockley, G.B.

    1992-01-01

    This paper provides an overview of the Westinghouse tubular SOFC technology and field testing program. The development program for the field testing was initiated in 1986 with a 400 W unit. This program has progressed to the installation and start-up in early 1992 of the 25 kill field unit at Rokko Island in Japan. In mid-1992 the second 25 kill field unit, a cogeneration system producing both ac electric power and intermediate pressure steam, will be delivered to the Joint Gas Utilities, a consortium of the Tokyo Gas Company and the Osaka Gas Company. This will be followed by the 20 kill SOFC unit to be supplied to Southern California Edison in early 1993. Future plans include the 100 kill Cogeneration Proof-of-Concept unit for the Southern California Gas Company which is scheduled for delivery in late 1993. Applications for SOFC technology range from on-site power generation for commercial second small industrial applications to dispersed generating plants and central station electric power generation. The design studies have included integrated coal gasification SOFC-steam turbine power plants. Installed capital costs of a 250 MW plant of this configuration compares favorably with the integrated coal gasification combined cycle plants.

  16. The Westinghouse solid oxide fuel cell program: Clean, efficient energy for the future

    SciTech Connect (OSTI)

    Gockley, G.B.

    1992-12-01

    This paper provides an overview of the Westinghouse tubular SOFC technology and field testing program. The development program for the field testing was initiated in 1986 with a 400 W unit. This program has progressed to the installation and start-up in early 1992 of the 25 kill field unit at Rokko Island in Japan. In mid-1992 the second 25 kill field unit, a cogeneration system producing both ac electric power and intermediate pressure steam, will be delivered to the Joint Gas Utilities, a consortium of the Tokyo Gas Company and the Osaka Gas Company. This will be followed by the 20 kill SOFC unit to be supplied to Southern California Edison in early 1993. Future plans include the 100 kill Cogeneration Proof-of-Concept unit for the Southern California Gas Company which is scheduled for delivery in late 1993. Applications for SOFC technology range from on-site power generation for commercial second small industrial applications to dispersed generating plants and central station electric power generation. The design studies have included integrated coal gasification SOFC-steam turbine power plants. Installed capital costs of a 250 MW plant of this configuration compares favorably with the integrated coal gasification combined cycle plants.

  17. Contract to coordinate on-going documentation requirements associated with Title X legislation for DOE active-solar activities. Final project technical report

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The objectives of this work were to ensure that Title X Active Solar Program reports complied with all guidance regarding length, format, coverage, tone, tables and schedules; provide necessary Conservation and Renewable Energy Office background and back-up material; follow this activity through to its completion in January 1982; assess information requirements associated with on-going documentation of Federal Buildings Program and its predecessors; establish a method for collecting, maintaining and utilizing appropriate program data specifically related to the preparation of report due in June 1982. Work on this project has generally remained on schedule and within budget. DOE-SAN has been instrumental in keeping us on track, by providing timely guidance as needed. Attached are recommendations and methods for documenting solar heat technologies research and the Title X sunset policy, planning, and evaluation long report for Active Solar Heating and Cooling Program.

  18. Notice of Intent to Revise DOE G 423.1-1A, Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-05

    The purpose of this revision is to incorporate lessons learned as identified by DOE program offices.

  19. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will be updated by comparing it to nationalinternational consensus standards on nanomaterial safety that have been developed and revised since this order was last reviewed....

  20. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    search form enables you to find content on the site by specifying one or more search terms. Remember that you can use the quick search anytime, it's normally good enough, this...

  1. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Authority Order No. 011.01-04 to the Realty Specialist, Office of Engineering and Construction Management Oct 18, 2011 Designation Order 00-01.00A to Susan F. Beard Aug 30, 2012...

  2. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (202) 287-5641 Christopher Tirado, (202) 586-4967 Rachel Mack, (202) 287-6804 Delegation Program Management Gail Cephas,(202) 586-1049 Web Site Administration Technical Support...

  3. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lost Password For security reasons, we store your password encrypted, and cannot mail it to you. If you would like to reset your password, fill out the form below and we will send...

  4. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Anonymous on Safeguards and Security Program Apr 19, 2008 Brian Anderson on Reporting Fraud, Waste and Abuse to the Office of Inspector General Apr 01, 2014 Gary Richards on...

  5. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is 2000-2016 by the Plone Foundation and friends. Distributed under the GNU GPL license. Powered by Plone & Python FOIA Program Web Policies AccessibilitySection 508 Privacy...

  6. Deployment Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contamination Workshop Deployment Requirements William Buttner National Renewable Energy Laboratory Hydrogen Safety Codes and Stands Group DOE Hydrogen Contamination Workshop Troy, Michigan June 13, 2014 THIS PRESENTATION DOES NOT CONTAIN ANY PROPRIETARY, CONFIDENTIAL OR OTHERWISE RESTRICTED INFORMATION 2 Outline of talk * SAE 2719 Requirements and the HCD Detector * Application Scenarios - Discreet vs. "real-time" - Centralized vs. On-site * Sensor Performance Parameters -

  7. Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY ASSURANCE REQUIREMENTS, AND DOE O 414.1C, QUALITY ASSURANCE

    Broader source: Energy.gov [DOE]

     According to DOE-STD-1146-2007, General Technical Base Qualification Standard, this module was to summarize the quality assurance information found in attachments 3, 4, and 5, of DOE O 414.1C,...

  8. Functions and requirements for Hanford single-shell tank leakage detection and monitoring

    SciTech Connect (OSTI)

    Cruse, J.M.; Ohl, P.C.

    1995-04-19

    This document provides the initial functions and requirements for leakage detection and monitoring applicable to past and potential future leakage from the Hanford Site`s 149 single-shell high-level waste tanks. This mission is a part of the overall mission of the Westinghouse Hanford Company Tank Waste Remediation System division to remediate the tank waste in a safe and acceptable manner. Systems engineering principles are being applied to this effort. This document reflects the an initial step in the systems engineering approach to decompose the mission into primary functions and requirements. The document is considered approximately 30% complete relative to the effort required to produce a final version that can be used to support demonstration and/or procurement of technologies. The functions and requirements in this document apply to detection and monitoring of below ground leaks from SST containment boundaries and the resulting soil contamination. Leakage detection and monitoring is invoked in the TWRS Program in three fourth level functions: (1) Store Waste, (2) Retrieve Waste, and (3) Disposition Excess Facilities (as identified in DOE/RL-92-60 Rev. 1, Tank Waste Remediation System Functions and Requirements).

  9. DOE-FLEX: DOE's Telework Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-05

    The directive establishes the requirements and responsibilities for the Departments telework program. Canceled by DOE O 314.1.

  10. Extension of DOE Directives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-03-18

    The following directives are extended until 3-18-06: DOE N 205.8, Cyber Security Requirements for Wireless Devices and Information Systems, dated 2-11-04; DOE N 205.9, Certification and Accreditation Process for Information Systems Including National Security Systems, dated 02-19-04; DOE N 205.10, Cyber Security Requirements for Risk Management, dated 02-19-04; DOE N 205.11, Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems, dated 2-19-04. DOE N 205.12, Clearing, Sanitizing, and Destroying Information System Storage Media, Memory Devices, and Other Related Hardware, dated 2-19-04.

  11. DOE Form

    National Nuclear Security Administration (NNSA)

    /1991) PROJECT: U.S. Department of Energy Requirements Change Notice Baseline List of Required Compliance Documents CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO.: DE-AC05-000R22800, I.85 , Laws, Regulations, and DOE Directives (December 2000), DEAR 970.5204-2 No.: NNSA-50 Page 1 of 36 Pages LOCATION: Oak Ridge, Tennessee DATE OF CONTRACT: August 31 , 2000 This Requirements Change Notice (RCN) No. NNSA-50 incorporates, into Section J, Attachment E, Contract No.

  12. DOE Form

    National Nuclear Security Administration (NNSA)

    11991) PROJECT: U.S. Department of Energy Requirements Change Notice Baseline List of Required Compliance Documents CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO. : DE-AC05-000R22800, 1.85, Laws, Regulations, and DOE Directives (December 2 000), DEAR 970.5204-2 COR-NP0-60 ESH-6.6.2013-515290 No.: NNSA-51 Page 1 of 34 Pages LOCATION : Oak Ridge, Tennessee DATE OF CONTRACT: August 31, 2000 This Requirements Change Notice (RCN) No. NNSA-51 incorporates, into Section J,

  13. Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-07-17

    The revision to DOE G 414.1-4 will conform to the revised DOE O 414.1D and incorporate new information and lessons learned since 2005, including information gained as a result of the February 2011, Government Accountability Office (GAO) report, GAO-11-143.

  14. Feedback | DOE PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Access Feedback Feedback DOE PAGES Beta is the central element in the Department of Energy (DOE) Public Access Plan for fulfilling requirements to provide long-term preservation and access to scholarly publications resulting from DOE research. The DOE Office of Scientific and Technical Information (OSTI) is committed to making DOE PAGES Beta as serviceable and easy to use as possible. We will appreciate your assistance as we work to ensure that PAGES Beta serves to help us fulfill our

  15. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    SciTech Connect (OSTI)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities.

  16. DOE-HDBK-1122-99 Radiological Control Technical Training, Oral Examination Boards Phase III, Part 8 of 9

    Office of Environmental Management (EM)

    Office of Environment, Safety & Health U.S. Department of Energy DOE-HDBK-1122-99 ii This page intentionally left blank DOE-HDBK-1122-99 iii Course Developers William Egbert Lawrence Livermore National Laboratory Dave Lent Coleman Research Michael McNaughton Los Alamos National Laboratory Bobby Oliver Lockheed Martin Energy Systems Richard Cooke Argonne National Laboratory Brian Thomson Sandia National Laboratory Michael McGough Westinghouse Savannah River Company Brian Killand Fluor Daniel

  17. DOE-STD-1082-94 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE nuclear safety requirements. DOE requirements are identified in DOE Rules, ...

  18. seca-workshop | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology Laboratory International Finance Corporation's (IFC) Program for ... Siemens Westinghouse Power Corporation Development Update on Delphi's Solid Oxide Fuel ...

  19. Supplemental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    SciTech Connect (OSTI)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria.

  20. DOE Explosives Safety Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-03-29

    This Manual describes DOE's explosives safety requirements applicable to operations involving the development, testing, handling, and processing of explosives or assemblies containing explosives.

  1. DOSE RATES FOR WESTINGHOUSE 17X17 MOX PWR SNF IN A WASTE PACKAGE (SCPB: N/A)

    SciTech Connect (OSTI)

    T.L. Lotz

    1997-01-29

    This analysis is prepared by the Mined Geologic Disposal System (MGDS) Waste Package Development Department (WPDD) to estimate the dose rate on and near the surface a Multi-Purpose Canister (MPC) PWR waste package (WP) which is loaded with Westinghouse 17 x 17 mixed oxide (MOX) PWR fuel. The 21 PWR MPC WP is used to provide an upper bound for waste package designs since the 12 PWR MPC WP will have a smaller source term and an equivalent amount of shielding. the objectives of this evaluation are to calculate the requested dose rate(s) and document the calculation in a fashion to allow comparisons to other waste forms and WP designs at a future time.

  2. Radiological Protection for DOE Activities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-29

    Establishes radiological protection program requirements that, combined with 10 CFR 835 and its associated implementation guidance, form the basis for a comprehensive program for protection of individuals from the hazards of ionizing radiation in controlled areas. Extended by DOE N 441.3. Cancels DOE 5480.11, DOE 5480.15, DOE N 5400.13, DOE N 5480.11; please note: the DOE radiological control manual (DOE/EH-0256T)

  3. Promulgating Nuclear Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-05-15

    Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

  4. DOE standard: Radiological control

    SciTech Connect (OSTI)

    Not Available

    1999-07-01

    The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities for implementing occupational radiological control programs. DOE has established regulatory requirements for occupational radiation protection in Title 10 of the Code of Federal Regulations, Part 835 (10 CFR 835), ``Occupational Radiation Protection``. Failure to comply with these requirements may lead to appropriate enforcement actions as authorized under the Price Anderson Act Amendments (PAAA). While this Standard does not establish requirements, it does restate, paraphrase, or cite many (but not all) of the requirements of 10 CFR 835 and related documents (e.g., occupational safety and health, hazardous materials transportation, and environmental protection standards). Because of the wide range of activities undertaken by DOE and the varying requirements affecting these activities, DOE does not believe that it would be practical or useful to identify and reproduce the entire range of health and safety requirements in this Standard and therefore has not done so. In all cases, DOE cautions the user to review any underlying regulatory and contractual requirements and the primary guidance documents in their original context to ensure that the site program is adequate to ensure continuing compliance with the applicable requirements. To assist its operating entities in achieving and maintaining compliance with the requirements of 10 CFR 835, DOE has established its primary regulatory guidance in the DOE G 441.1 series of Guides. This Standard supplements the DOE G 441.1 series of Guides and serves as a secondary source of guidance for achieving compliance with 10 CFR 835.

  5. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    SciTech Connect (OSTI)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  6. Transuranic Waste Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  7. DOE Directives | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Directives DOE Directives Directives are the Department of Energy's primary means to communicate and institutionalize directives and policies and to establish requirements, responsibilities, and procedures for Departmental elements and contractors. DOE O 413.3A - Program and Project Management for the Acquisition of Capital Assets DOE G 413.3-1 - Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A DOE G 413.3-2 - Quality Assurance Guide for Project Management DOE

  8. Report for Westinghouse Hanford Company: Makeup procedures and characterization data for modified DSSF and modified remaining inventory simulated tank waste

    SciTech Connect (OSTI)

    Lokken, R.O.

    1996-03-01

    The majority of defense wastes generated from reprocessing spent reactor fuel at Hanford are stored in underground Double-Shell Tanks (DST) and in older Single-Shell Tanks (SST). The Tank Waste Remediation System (TWRS) Program has the responsibility of safely managing and immobilizing these tank wastes for disposal. A reference process flowsheet is being developed that includes waste retrieval, pretreatment, and vitrification. Melter technologies for vitrifying low-level tank wastes are being evaluated by Westinghouse Hanford Company. Chemical simulants are being used in the technology testing. For the first phase of low-level waste (LLW) vitrification simulant development, two waste stream compositions were investigated. The first waste simulant was based on the analyses of six tanks of double-shell slurry feed (DSSF) waste and on the projected composition of the wastes exiting the pretreatment operations. A simulant normalized to 6 M sodium was based on the anticipated chemical concentrations after ion exchange and initial separations. The same simulant concentrated to 10 M sodium would represent a waste that had been concentrated by evaporation to reduce the overall volume. The second LLW simulant, referred to as the remaining inventory (RI), included wastes not included in the DSSF tanks and the projected LLW fraction of single-shell tank wastes.

  9. General Responsibilities and Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  10. DOE Zero Energy Ready Home

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Provisions of the DOE Zero Energy Ready Home PV-Ready Checklist are Completed; (Solar Hot Water Ready provisions are encouraged but not required) 19 Exhibit 2: DOE Zero Energy ...

  11. DOE Explosives Safety Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-01-09

    The Manual describes the Departments explosive safety requirements applicable to operations involving the development, testing, handling, and processing of explosives or assemblies containing explosives. Cancels DOE M 440.1-1. Canceled by DOE O 440.1B Chg 1.

  12. DOE - Fossil Energy:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pass LNG Terminal to any country with which the United States does not have a Free Trade Agreement requiring the national treatment for trade in natural gas and LNG, that has or...

  13. DOE/LM-1469

    Office of Environmental Management (EM)

    DOE/LM-1469

  14. Use of InSpector{sup TM} 1 1000 Instrument with LaBr{sub 3} for Nuclear Criticality Safety (NCS) Applications at the Westinghouse Hematite Decommissioning Project (HDP) - 13132

    SciTech Connect (OSTI)

    Pritchard, Megan; Guido, Joe

    2013-07-01

    The Westinghouse Hematite Decommissioning Project (HDP) is a former nuclear fuel cycle facility that is currently undergoing decommissioning. One aspect of the decommissioning scope is remediation of buried nuclear waste in unlined burial pits. The current Nuclear Criticality Safety program relies on application of criticality controls based on radiological setpoints from a 2 x 2 Sodium Iodide (NaI) detector. Because of the nature of the material buried (Low Enriched Uranium (LEU), depleted uranium, thorium, and radium) and the stringent threshold for application of criticality controls based on waste management (0.1 g {sup 235}U/L), a better method for {sup 235}U identification and quantification has been developed. This paper outlines the early stages of a quick, in-field nuclear material assay and {sup 235}U mass estimation process currently being deployed at HDP. Nuclear material initially classified such that NCS controls are necessary can be demonstrated not to require such controls and dispositioned as desired by project operations. Using Monte Carlo techniques and a high resolution Lanthanum Bromide (LaBr) detector with portable Multi-Channel Analyzer (MCA), a bounding {sup 235}U mass is assigned to basic geometries of nuclear material as it is excavated. The deployment of these methods and techniques has saved large amounts of time and money in the nuclear material remediation process. (authors)

  15. Immortalization of normal human mammary epithelial cells in two steps by direct targeting of senescence barriers does not require gross genomic alterations

    SciTech Connect (OSTI)

    Garbe, James C.; Vrba, Lukas; Sputova, Klara; Fuchs, Laura; Novak, Petr; Brothman, Arthur R.; Jackson, Mark; Chin, Koei; LaBarge, Mark A.; Watts, George; Futscher, Bernard W.; Stampfer, Martha R.

    2014-10-29

    Telomerase reactivation and immortalization are critical for human carcinoma progression. However, little is known about the mechanisms controlling this crucial step, due in part to the paucity of experimentally tractable model systems that can examine human epithelial cell immortalization as it might occur in vivo. We achieved efficient non-clonal immortalization of normal human mammary epithelial cells (HMEC) by directly targeting the 2 main senescence barriers encountered by cultured HMEC. The stress-associated stasis barrier was bypassed using shRNA to p16INK4; replicative senescence due to critically shortened telomeres was bypassed in post-stasis HMEC by c-MYC transduction. Thus, 2 pathologically relevant oncogenic agents are sufficient to immortally transform normal HMEC. The resultant non-clonal immortalized lines exhibited normal karyotypes. Most human carcinomas contain genomically unstable cells, with widespread instability first observed in vivo in pre-malignant stages; in vitro, instability is seen as finite cells with critically shortened telomeres approach replicative senescence. Our results support our hypotheses that: (1) telomere-dysfunction induced genomic instability in pre-malignant finite cells may generate the errors required for telomerase reactivation and immortalization, as well as many additional passenger errors carried forward into resulting carcinomas; (2) genomic instability during cancer progression is needed to generate errors that overcome tumor suppressive barriers, but not required per se; bypassing the senescence barriers by direct targeting eliminated a need for genomic errors to generate immortalization. Achieving efficient HMEC immortalization, in the absence of passenger genomic errors, should facilitate examination of telomerase regulation during human carcinoma progression, and exploration of agents that could prevent immortalization.

  16. Immortalization of normal human mammary epithelial cells in two steps by direct targeting of senescence barriers does not require gross genomic alterations

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Garbe, James C.; Vrba, Lukas; Sputova, Klara; Fuchs, Laura; Novak, Petr; Brothman, Arthur R.; Jackson, Mark; Chin, Koei; LaBarge, Mark A.; Watts, George; et al

    2014-10-29

    Telomerase reactivation and immortalization are critical for human carcinoma progression. However, little is known about the mechanisms controlling this crucial step, due in part to the paucity of experimentally tractable model systems that can examine human epithelial cell immortalization as it might occur in vivo. We achieved efficient non-clonal immortalization of normal human mammary epithelial cells (HMEC) by directly targeting the 2 main senescence barriers encountered by cultured HMEC. The stress-associated stasis barrier was bypassed using shRNA to p16INK4; replicative senescence due to critically shortened telomeres was bypassed in post-stasis HMEC by c-MYC transduction. Thus, 2 pathologically relevant oncogenic agentsmore » are sufficient to immortally transform normal HMEC. The resultant non-clonal immortalized lines exhibited normal karyotypes. Most human carcinomas contain genomically unstable cells, with widespread instability first observed in vivo in pre-malignant stages; in vitro, instability is seen as finite cells with critically shortened telomeres approach replicative senescence. Our results support our hypotheses that: (1) telomere-dysfunction induced genomic instability in pre-malignant finite cells may generate the errors required for telomerase reactivation and immortalization, as well as many additional “passenger” errors carried forward into resulting carcinomas; (2) genomic instability during cancer progression is needed to generate errors that overcome tumor suppressive barriers, but not required per se; bypassing the senescence barriers by direct targeting eliminated a need for genomic errors to generate immortalization. Achieving efficient HMEC immortalization, in the absence of “passenger” genomic errors, should facilitate examination of telomerase regulation during human carcinoma progression, and exploration of agents that could prevent immortalization.« less

  17. DOE Policy for Digital Research Data Management: FAQs

    Broader source: Energy.gov [DOE]

    Requirements, Guidance, and FAQs specific to the sponsoring DOE office can be found under the Requirements and Guidance from DOE Sponsoring Offices.​ ​

  18. Version Tracking Document for DOE Challenge Homes, National Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. ...

  19. DOE Cooperative Research and Development Agreements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-11-06

    The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Supersedes DOE O 483.1 Admin Chg 1 and DOE M 483.1-1.

  20. index | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A diverse collection of energy technologies and integrated systems are required to achieve U.S. DOE goals. NETL energy analyses examine technologies across the Clean Coal and ...

  1. Department of Energy Office of Nuclear Safety and Environmental Policy Technical Position NSEP-TP-2007- 1, Technical Position on the Requirement in DOE 0 420.1B to Use National Consensus Industry Standards and the Model Building CodesTechnical Position NS

    Broader source: Energy.gov [DOE]

    All new construction required to follow the provisions of Department of Energy(DOE) Order 420. lB, Facility Safety, must comply with national consensus industrystandards and the model building...

  2. DOE F 1450.5B

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REQUIREMENTS 3. ROUTING NUMBER Fillable Form DOE F 1450.5B OMB Control No 1910-0100 2 of 4 ... REQUIREMENTS (CONT) DOE F 1450.5B OMB Control No 1910-0100 3 of 4 Pages (Continued) ...

  3. The INL Seismic Risk Assessment Project: Requirements for Addressing...

    Office of Environmental Management (EM)

    Project: Requirements for Addressing DOE Order 420.1C & A Proposed Generic Methodology The INL Seismic Risk Assessment Project: Requirements for Addressing DOE Order...

  4. Frequently Asked Questions | DOE PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Frequently Asked Questions Frequently Asked Questions I'm a researcher at a DOE national laboratory and have just had a manuscript accepted for publication in a peer-reviewed journal; what do I need to do in order to comply with DOE's public access requirements? I'm a researcher with a grant from DOE and have just had a manuscript accepted for publication in a peer-reviewed journal; what do I need to do in order to comply with DOE's public access requirements? What is DOE's Public Access

  5. DOE enforcement program roles and responsibilities: DOE handbook

    SciTech Connect (OSTI)

    1995-08-01

    The Price-Anderson Act provides indemnification to DOE contractors who manage and conduct nuclear activities in the DOE complex. The government acts as an insurer for these contractors against any findings of liability from the nuclear activities of the contractor within the scope of its contract. 10 CFR Part 820 establishes the legal framework for implementing DOE`s Nuclear Safety Enforcement Program. Integration with other DOE organizations and programs would assure that the enforcement process properly considers the actual or potential safety significance of a violation when determining an appropriate enforcement sanction. Achieving a proactive contractor compliance assurance rather than a heavy enforcement hand, will require a foundation of cooperation and teamwork across DOE organizations. This handbook identifies the areas of interface for the DOE Enforcement Program and provides guidance on roles and responsibilities for the key DOE organizational areas. It complements DOE-HDBK-1087-95 and 1089-95.

  6. Directives Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    other reviewers to this FAQ page How can I change my RevCom password? If you have forgotten your password, you will see "Forgot your password?" below where you would enter it....

  7. Quality Assurance - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delegation of Safety Authorities (Cange - EM) NA, Delegation of Safety Authorities (Cooper - EM) NA, Delegation of Safety Authorities (Franco - EM) NA, Delegation of Safety...

  8. Directives Tools - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guides (Text version available here) Cancelling a Directive New Canceling a Directive The process for canceling directives (Text version available here) Directives Templates...

  9. News - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will be updated by comparing it to nationalinternational consensus standards on nanomaterial safety that have been developed and revised since this order was last reviewed....

  10. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Delegation Procedures by Website Administrator Text Delegation Procedures - by Website Administrator - last modified Mar 23, 2015 11:12 AM Procedures for...

  11. Redelegation Procedures - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Redelegation Procedures by Website Administrator Text version available here. Delegation Procedures Re-Delegation Procedures Document Actions Redelegation...

  12. Email Alerts - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Alerts by Diane Johnson Use this form to subscribeunsubscribe to email alerts. Please select the type of email alert that you would like to receive. Your Name Please enter...

  13. Updates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updates by Diane Johnson Email Alerts Subscribe to automatic e-mail notification about updates to the portal. Email Alerts Document Actions...

  14. Email Notification - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Notification by Diane Johnson Use this form to subscribeunsubscribe to email alerts. Please select the type of email alert that you would like to receive. Your Name Please...

  15. Recent Updates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    days Next week Next 2 weeks Next month Next 3 months Next 6 months Next year Next 2 years Future Past 2 years ago 1 year ago 6 months ago 3 months ago 1 month ago 2 weeks ago 1...

  16. NERSC/DOE BES Requirements Workshop Presentations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Molecules February 9, 2010 | Author(s): Brian Austin | Simulations of correlated electrons: What's under the superconducting dome in the two-dimensional Hubbard model?...

  17. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of a Department of Energy Official. Delegation of routine office-management andor administrative responsibilities from one official to another within a particular office....

  18. Justification Memoranda - DOE Directives, Delegations, and Requirement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    workplace program to test for the use of illegal drugs to facilitate the maintenance of a drug-free Federal workplace. In the course of the revision, the document number will...

  19. Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (202) 287-5641 Christopher Tirado, (202) 586-4967 Rachel Mack, (202) 287-6804 Delegation Program Management Gail Cephas,(202) 586-1049 Web Site Administration Technical Support...

  20. Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue Date Start date End date Subjects match any Administration Environment Finance Health Human Resources Information Technology Management and Operations Procurement Safety...

  1. NERSC/DOE ASCR Requirements Workshop Presentations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Study: IO Software January 5, 2011 | Author(s): Alok Choudhary | Workshop outline, logistics, format January 5, 2011 | Author(s): Harvey Wasserman | NERSC Role in Advanced...

  2. Rescinded Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rescinded Delegations At the Department of Energy, the Secretarial Delegation of Authority is the legal instrument used to transfer authority granted to the Secretary of Energy by...

  3. Directives Templates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and format Directives Templates Justification Memoranda Per Secretarial Memo, Enterprise Risk Management (ERM) Framework for Directives, dated July 9, 2012, by September 1, 2012,...

  4. Certification for DOE M 441.1-1 and DOE O 5480.30

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-18

    On the basis of our review, we have determined that DOE M 441.1-1 and DOE O 5480.30 continue to be relevant and effective. They remain a necessary part of the DOE nuclear safety requirements system.

  5. NEW - DOE O 227.1A, Independent Oversight Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program.

  6. DOE F

    Office of Environmental Management (EM)

    242.1 (12-2014) U.S. DEPARTMENT OF ENERGY Forms Manager Designation SECTION I. Designation Information Pursuant to DOE Guide 242.1-1, Forms Management Guide, (Name) _______________________________________________ is hereby designated a Forms Manager for (DOE Organization/Contractor Activity) ____________________________________________________________________. The incumbent's responsibilities include providing guidance and assisting within their respective organizations, supporting applicable

  7. Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Requirements Statutes 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air Act, Section 309 CEQ Regulations 40 CFR Part 1500-1508: CEQ - Regulations for Implementing NEPA DOE Regulations and Orders 10 CFR Part 1021: NEPA Implementing Procedures 10 CFR Part 1021: NEPA Rulemaking Process 10 CFR Part 1022: Compliance with Floodplain and Wetland Environmental Review Requirements DOE O 451.1B:

  8. DOE 2010 occupational radiation exposure

    SciTech Connect (OSTI)

    none,

    2011-11-01

    The U.S. Department of Energy (DOE) Office of Analysis within the Office of Health, Safety and Security (HSS) publishes the annual DOE Occupational Radiation Exposure Report to provide an overview of the status of radiation protection practices at DOE.* The DOE 2010 Occupational Radiation Exposure Report provides an evaluation of DOE-wide performance regarding compliance with DOE Part 835 dose limits and as low as reasonably achievable (ALARA) process requirements. In addition, the report provides data to DOE organizations responsible for developing policies for protection of individuals from the effects of radiation. The report provides a summary and an analysis of occupational radiation exposure information from the monitoring of individuals involved in DOE activities. The occupational radiation exposure information is analyzed in terms of aggregate data, dose to individuals, and dose by site over the past 5 years.

  9. New - DOE G 436.1-1, Federal Sustainable Print Management - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patricia Greeson The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental...

  10. DOE Challenge Home Recommended Quality Management Provisions | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Recommended Quality Management Provisions DOE Challenge Home Recommended Quality Management Provisions DOE Challenge Home Recommended Quality Management Provisions. PDF icon qm_6-14-13.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) Washington DOE ZERH Program Requirements DOE Challenge Home, California

  11. DOE standard: Firearms safety

    SciTech Connect (OSTI)

    1996-02-01

    Information in this document is applicable to all DOE facilities, elements, and contractors engaged in work that requires the use of firearms as provided by law or contract. The standard in this document provides principles and practices for implementing a safe and effective firearms safety program for protective forces and for non-security use of firearms. This document describes acceptable interpretations and methods for meeting Order requirements.

  12. DOE Cooperative Research and Development Agreements Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-12

    This Manual provides detailed requirements to supplement DOE O 483.1, DOE Cooperative Research and Development Agreements, dated 1-12-01, which establishes requirements for the performance of technology transfer through the use of Cooperative Research and Development Agreements (CRADAs). Canceled by DOE O 483.1A.

  13. BER Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Science Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is

  14. BES Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  15. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  16. DOE Zero Energy Ready Home Solar Hot Water-Ready Checklist

    Broader source: Energy.gov [DOE]

    DOE Zero Energy Ready Home National Program encourages, but does not require, consideration of this checklist. 

  17. DOE 2014 Occupational Radiation Exposure Report ALARA Activities at DOE

    Office of Environmental Management (EM)

    ALARA Activities at DOE 1 2014 ALARA Activities at DOE ALARA Activities at DOE At the Fermi National Accelerator Laboratory (Fermilab), a policy consistent with integrated safety management (ISM) and in accordance with 10 CFR Part 835 requirements is to conduct activities in such a manner that worker and public safety, and protection of the environment are given the highest priority. Fermilab is committed, in all its activities, to maintain any safety, health, or environmental risks associated

  18. DOE Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site August 2010 DOE/EA-1772 Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site August 2010 CONTENTS ACRONYMS.............................................................................................................................................. vii GLOSSARY

  19. DOE Reports

    Broader source: Energy.gov [DOE]

    10 CFR Part 63, YMRP, and Yucca Mountain Repository License Application Cross Reference Matrix. (pdf)Note: Primary Reference Documents Disk 1 and Disk 2 filescan be received by contacting the DOE...

  20. Requirement-Reviews.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  1. DOE HANDBOOK

    Office of Environmental Management (EM)

    Handbook on Overseas Assignments United States Department of Energy Office of Human Capital Management August 2014 2 Introduction This handbook covers all types of Federal employment overseas, including details, both within DOE as well as to other agencies; transfers to approved international organizations; assignments to permanent DOE positions; cost-free experts; and personal services agreements (PSAs). This handbook contains information, guidance, sample service agreements, and related

  2. DOE Announces Tougher Enforcement of Appliance Standards Reporting...

    Office of Environmental Management (EM)

    DOE will begin aggressively enforcing these reporting requirements, including seeking civil penalties or fines. This 30 day period does not apply to violations of the actual...

  3. DOE F 1450.5b | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    b DOE F 1450.5b Form gathers organizational information and requirements from ... PDF icon Request for Commercial Timesharing Services More Documents & Publications DOE F ...

  4. DOE F 5631.34 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE F 5631.34 Form captures required information on spousecohabitant to determine an individual's access authorization eligibility. PDF icon DOE F 5631 34 Data Report on Spouse ...

  5. Steam Reforming Technology for Denitration and Immobilization of DOE Tank Wastes

    SciTech Connect (OSTI)

    Mason, J. B.; McKibbin, J.; Ryan, K.; Schmoker, D.

    2003-02-26

    THOR Treatment Technologies, LLC (THOR) is a joint venture formed in June 2002 by Studsvik, Inc. (Studsvik) and Westinghouse Government Environmental Services Company LLC to further develop, market, and deploy Studsvik's patented THORSM non-incineration, steam reforming waste treatment technology. This paper provides an overview of the THORSM steam reforming process as applied to the denitration and conversion of Department of Energy (DOE) tank wastes to an immobilized mineral form. Using the THORSM steam reforming technology to treat nitrate containing tank wastes could significantly benefit the DOE by reducing capital and life-cycle costs, reducing processing and programmatic risks, and positioning the DOE to meet or exceed its stakeholder commitments for tank closure. Specifically, use of the THORSM technology can facilitate processing of up to 75% of tank wastes without the use of vitrification, yielding substantial life-cycle cost savings.

  6. Natural Phenomena Hazards DOE-STD 1020-2012 & DOE Handbook | Department of

    Energy Savers [EERE]

    Energy Natural Phenomena Hazards DOE-STD 1020-2012 & DOE Handbook Natural Phenomena Hazards DOE-STD 1020-2012 & DOE Handbook Natural Phenomena Hazards DOE-STD 1020-2012 & DOE Handbook Mark Blackburn P.E. Office of Nuclear Facility Safety Programs AU, 32 October 21, 2014 PDF icon Natural Phenomena Hazards DOE-STD 1020-2012 & DOE Handbook More Documents & Publications Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP)

  7. Liquefaction Evaluations at DOE Sites

    Office of Environmental Management (EM)

    LIQUEFACTION EVALUATIONS AT DOE SITES M. Lewis, M. McHood, R. Williams, B. Gutierrez October 25, 2011 Agenda  Background  Purpose and Objective  Liquefaction Methods  Site Evaluations  Aging  Conclusions 2 Background 3 Liquefaction at DOE Sites Background  Liquefaction evaluations are required at all DOE sites  Methods have evolved over the years, but there is currently only one consensus methodology;  Youd et al., 2001  Two other methods have emerged in the last

  8. DOE Cooperative Research and Development Agreements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-12

    To establish Department of Energy (DOE) policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. No cancellation.

  9. Worker Protection Management for DOE Federal and Contractor Employees Guide for use with DOE O 440.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-07-10

    This implementation guide provides general information and methodologies that DOE finds acceptable in meeting the Department's requirements defined in DOE O 440.1.

  10. DOE 2011 occupational radiation exposure

    SciTech Connect (OSTI)

    none,

    2012-12-01

    The U.S. Department of Energy (DOE) Office of Analysis within the Office of Health, Safety and Security (HSS) publishes the annual DOE Occupational Radiation Exposure Report to provide an overview of the status of radiation protection practices at DOE (including the National Nuclear Security Administration [NNSA]). The DOE 2011 Occupational Radiation Exposure Report provides an evaluation of DOE-wide performance regarding compliance with Title 10, Code of Federal Regulations (C.F.R.), Part 835, Occupational Radiation Protection dose limits and as low as reasonably achievable (ALARA) process requirements. In addition, the report provides data to DOE organizations responsible for developing policies for protection of individuals from the adverse health effects of radiation. The report provides a summary and an analysis of occupational radiation exposure information from the monitoring of individuals involved in DOE activities. The occupational radiation exposure information is analyzed in terms of aggregate data, dose to individuals, and dose by site over the past five years.

  11. DOE 2012 occupational radiation exposure

    SciTech Connect (OSTI)

    none,

    2013-10-01

    The U.S. Department of Energy (DOE) Office of Analysis within the Office of Health, Safety and Security (HSS) publishes the annual DOE Occupational Radiation Exposure Report to provide an overview of the status of radiation protection practices at DOE (including the National Nuclear Security Administration [NNSA]). The DOE 2012 Occupational Radiation Exposure Report provides an evaluation of DOE-wide performance regarding compliance with Title 10, Code of Federal Regulations (C.F.R.), Part 835, Occupational Radiation Protection dose limits and as low as reasonably achievable (ALARA) process requirements. In addition, the report provides data to DOE organizations responsible for developing policies for protection of individuals from the adverse health effects of radiation. The report provides a summary and an analysis of occupational radiation exposure information from the monitoring of individuals involved in DOE activities. Over the past 5-year period, the occupational radiation exposure information is analyzed in terms of aggregate data, dose to individuals, and dose by site.

  12. DOE Zero Energy Ready Home

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Provisions of the DOE Zero Energy Ready Home PV-Ready Checklist are Completed; (Solar Hot Water Ready provisions are encouraged but not required) 19 8. Air Infiltration For ...

  13. DOE-STD-1104-2009

    Broader source: Energy.gov [DOE]

    Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents Superseding DOE-STD-1104-96 | Replaced by DOE-STD-1104-2014 This Standard describes a framework and criteria for reviewing safety basis documents that will support DOE approval of the documents as required by 10 CFR 830 Subpart B and DOE-STD-1189-2008 (as invoked by DOE Order 413.3A, Chg 1) including preparation of SERs and SVRs for nuclear facilities.

  14. DOE Challenge Home Verification

    Office of Environmental Management (EM)

    DOE Challenge Home Verification Projected Rating: Based on Plans - Field Confirmation Required. Energy Performance House Ty pe DOE Challenge Home Builder Partner ID# Single-family det ac hed 12345 Y ear built Square footage of Conditioned Space including Basement 2013 3968.0 Numbe r of Bedrooms Square footage of Conditioned Space without Basement 4 2368.0 Site addre ss (if no t available , list the site Lo t #) Registered Builder 555 Main St r eet Cold City Certified Rater MN, 20853 HERS Index

  15. DOE-STD-1172-2011

    Broader source: Energy.gov [DOE]

    Safety Software Quality Assurance Functional Area Qualification Standard This SSQA FAQS identifies the minimum technical competency requirements for DOE personnel who have a responsibility for safety software. Although there may be other competency requirements associated with the positions held by DOE personnel, this technical FAQS is limited to identifying the specific technical competencies required throughout all defense nuclear facilities.

  16. DOE-0336

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    36 Revision 1A Hanford Site Lockout/Tagout Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0336, Hanford Site Lockout/Tagout Procedure, Revision 1A Page 2 of 49 Contents 1.0 PURPOSE ......................................................................................................................................... 3 2.0 SCOPE

  17. DOE F 5484.4 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE F 5484.4 Form provides informaiton required for normalizing DOE accident statistics ... More Documents & Publications DOE F 5484.3 Federal Employee Occupational Safety And Health ...

  18. DOE Technical Standards Archived Collection | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    that satisfy the requirements of DOE Order 5700.6C. 03121996 DOE-HDBK-1010-92 DOE Fundamentals Handbook, Classical Physics Reaffirmed 1999 The handbook includes information on...

  19. Application of Engineering and Technical Requirements for 30...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30, 60, and 90% Design of DOE Nuclear Facilities Application of Engineering and Technical Requirements for 30, 60, and 90% Design of DOE Nuclear Facilities This Standard Review...

  20. DRAFT DOE Training Curriculum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Training Curriculum DOE-100DE Federal Staff Orientation Training DOE-120 DOE Oversight and Implementation DOE-140 Developing Integrated Oversight Plans (Managers/Supervisors) PHY-128DE Basic Survey Overview PHY-130 Basic Survey VAP-335 Fundamentals of Performance Testing DOE-200DE Assessment Fundamentals DOE-210 Assessment Preparation DOE-220 Assessment Techniques DOE-130 Performance Management Fundamentals DOE-310 Oversight Data Analysis & Reporting DOE-320 Causal Analysis &

  1. Wet processing of palladium for use in the tritium facility at Westinghouse, Savannah River, SC. Preparation of palladium using the Mound Muddy Water process

    SciTech Connect (OSTI)

    Baldwin, D.P.; Zamzow, D.S.

    1998-11-10

    Palladium used at Savannah River for tritium storage is currently obtained from a commercial source. In order to better understand the processes involved in preparing this material, Savannah River is supporting investigations into the chemical reactions used to synthesize this material and into the conditions necessary to produce palladium powder that meets their specifications. This better understanding may help to guarantee a continued reliable source for this material in the future. As part of this evaluation, a work-for-others contract between Westinghouse Savannah River Company and the Ames Laboratory Metallurgy and Ceramics Program was initiated. During FY98, the process for producing palladium powder developed in 1986 by Dan Grove of Mound Applied Technologies (USDOE) was studied to understand the processing conditions that lead to changes in morphology in the final product. This report details the results of this study of the Mound Muddy Water process, along with the results of a round-robin analysis of well-characterized palladium samples that was performed by Savannah River and Ames Laboratory. The Mound Muddy Water process is comprised of three basic wet chemical processes, palladium dissolution, neutralization, and precipitation, with a number of filtration steps to remove unwanted impurity precipitates.

  2. Laboratory Directed Research and Development - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2C, Laboratory Directed Research and Development by Russell Ames Functional areas: Energy Research & Technology To establish Department of Energy (DOE) requirements for laboratory...

  3. DOE - Office of Legacy Management -- Ashtabula

    Office of Legacy Management (LM)

    for maintaining records for the Ashtabula site was transferred to DOE's Office of Legacy Management in 2010. The site requires records management and stakeholder support. For...

  4. DOE - Office of Legacy Management -- CEER

    Office of Legacy Management (LM)

    for maintaining records for the CEER site transferred to DOE's Office of Legacy Management in 2006. The site requires records management and stakeholder support. For...

  5. Quality Assurance Functional Area Qualification Standard - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    establishes common functional area competency requirements for DOE personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical QA...

  6. Quality Assurance Functional Area Qualification Standard - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    common functional area competency requirements for all DOE QA personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical...

  7. DOE-HDBK-1078-94 | Department of Energy

    Energy Savers [EERE]

    June 18, 2014 Training Program Handbook: A Systematic Approach to Training Reaffirmed June 2014 | Supercedes DOE-STD-0102T, TAP-2 This Department of Energy (DOE) Handbook, DOE-HDBK-1078-94, Training Program Handbook: A Systematic Approach to Training, describes a systematic method for establishing and maintaining training programs that meet the requirements and expectations of DOE Orders DOE O 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear

  8. DOE-STD-3020-97 | Department of Energy

    Energy Savers [EERE]

    97 DOE-STD-3020-97 March 12, 1997 Specification for HEPA Filters used by DOE Contractors Supersedes DOE NE F3-45 (January 1987) | Replaced by DOE-STD-3020-2005 This standard establishes specification and testing requirements for High Efficiency Particulate Air (HEPA) filters procured to provide personnel and environmental protection when installed in DOE nuclear facilities. The standard specifies minimum requirements to be included in contractor specifications. PDF icon DOE-STD-3020-97,

  9. DOE-0342

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 2A Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP) Date Published _________________ Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, Washington 99352 Release Approval Date By Janis D. Aardal at 9:28 am, May 14, 2014 Approved for Public Release; Further Dissemination Unlimited DOE-0342, Rev. 2A Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP) Published Date: 09-19-2013 Effective Date:

  10. DOE-0344

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Revision 3A Hanford Site Excavating, Trenching and Shoring Procedure (HSETSP) Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0344, Rev. 3A Hanford Site Excavating, Trenching, and Shoring Procedure (HSETSP) Published Date: 10-30-2013 Effective Date: 11-29-2013 Change Summary Page 1 of 2 CHANGE SUMMARY Justification for revision: This revision is to allow for the use of an automated

  11. DOE-0400

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    400 Revision 0 Hanford Site-Wide Employee Concerns Program Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0400, Rev. 0 Hanford Site-Wide Employee Concerns Program Procedure Published Date: 10-29-2013 Effective Date: 11-27-2013 ii CHANGE SUMMARY Revision # Date/Section Changed Change Details 0 7/23/2013 Initial Issue developed by the Employee Concerns Committee, composed of

  12. DOE PAGES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy PAGES: Public Access Gateway for Energy & Science Access journal articles and accepted manuscripts resulting from DOE research funding Search For Terms: Find + Advanced Search × Advanced Search All Fields: Title: Full Text: Bibliographic Data: Creator / Author: Name Name ORCID Search Authors Type: All Accepted Manuscript Published Article Publisher's Accepted Manuscript Journal Name: Subject: Identifier Numbers: Research Org: Sponsoring Org: Publication Date: to Update

  13. DOE-STD-3020-2005 | Department of Energy

    Energy Savers [EERE]

    05 DOE-STD-3020-2005 December 12, 2005 Specification for HEPA Filters used by DOE Contractors Replaced by DOE-STD-3020-2015 | Supersedes DOE-STD-3020-97 (January 1997) This standard establishes specifications and quality assurance requirements for High Efficiency Particulate Air (HEPA) filters procured to protect workers, the public, and the environment when installed in DOE nuclear facilities. PDF icon DOE-STD-3020-2005, Specification for HEPA Filters used by DOE Contractors More Documents

  14. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  15. DOE Cooperative Research and Development Agreements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    To establish Department of Energy (DOE) policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Admin Chg, dated 9-18-2013. Canceled by DOE O 483.1A.

  16. DOE-HDBK-1216-2015

    Broader source: Energy.gov [DOE]

    Environmental Radiological Effluent Monitoring and Environmental Surveillance The Department of Energy’s (DOE) radiation protection of the public and the environment is contained within DOE Order (O) 458.1, Radiation Protection of the Public and the Environment. This Handbook describes elements that may be used to implement the radiological effluent monitoring and environmental surveillance requirements in DOE O 458.1.

  17. DOE-STD-1012-92

    Office of Energy Efficiency and Renewable Energy (EERE)

    Guide to Good Practices for On-The-Job Training Replaced by DOE-HDBK-1206-98 Training programs at DOE facilities should prepare personnel to safely and efficiently operate and maintain the facilities in accordance with DOE requirements. This guide presents good practices for performance-based on-the-job training and OJT programs.

  18. DOE-STD-1176-2010

    Broader source: Energy.gov [DOE]

    Chemical Processing Functional Area Qualification Standard The Chemical Processing FAQS establishes common functional area competency requirements for all DOE chemical processing personnel who provide assistance in, direction or guidance to, or oversight or evaluation of contractor technical activities that could impact the safe operation of DOEs defense nuclear facilities.

  19. DOE-STD-1183-2007

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nuclear Safety Specialist Functional Area Qualification Standard The Nuclear Safety Specialist FAQS establishes common functional area competency requirements for all DOE nuclear safety specialist personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities that could impact the safe operation of DOEs defense nuclear facilities.

  20. DOE-STD-1030-96

    Office of Energy Efficiency and Renewable Energy (EERE)

    Guide to Good Practices for Lockouts and Tagouts Supersedes DOE-STD-1030-92 This Guide to Good Practices is written to enhance understanding of, and provide direction for, Lockouts and Tagouts, Chapter IX of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities

  1. DOE-STD-1173-2003

    Broader source: Energy.gov [DOE]

    Criticality Safety Functional Areq Qualification Standard Replaced by DOE-STD-1173-2009 The Criticality Safety Functional Area Qualification Standard establishes common functional area competency requirements for Department of Energy criticality safety personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities that could impact the safe operation of DOEs defense nuclear facilities.

  2. Information Technology Project Management - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE G 200.1-1 App A, Appendix A Glossary on Dec 03, 2012 DOE G 200.1-1 Ch 4, Requirements Definition Stage on Dec 03, 2012 DOE G 200.1-1 App B, List of Abbreviations on Dec 03,...

  3. DOE-STD-6002-96 | Department of Energy

    Energy Savers [EERE]

    2-96 DOE-STD-6002-96 August 11, 2005 Safety of Magnetic Fusion Facilities: Requirements This Standard identifies safety requirements for magnetic fusion facilities. Also, safety principles are established to provide a framework within which the requirements can be implemented to build safety into fusion facility design and operations. PDF icon DOE-STD-6002-96, Safety of Magnetic Fusion Facilities: Requirements More Documents & Publications DOE-STD-6003-96 Technical Standards, DOE Orders and

  4. NP Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  5. DOE G 414.1-4 and 404.1-2B Training module

    Office of Environmental Management (EM)

    FOR USE WITH 10 CFR 830, SUBPART A, QUALITY ASSURANCE REQUIREMENTS, AND DOE O 414.1C, QUALITY ASSURANCE DOE G 414.1-2B QUALITY ASSURANCE PROGRAM GUIDE DOE G 414.1-4 and DOE G ...

  6. DOE-STD-1022-94

    Broader source: Energy.gov [DOE]

    Natural Phenomena Hazards Characterization Criteria Replaced by DOE-STD-1020-2012 | Change Notice No. 1 (January 1996) | Reaffirmed with Errata (April 2002) The Department of Energy (DOE) has established policy and requirements for natural phenomena hazard (NPH) mitigation for DOE sites and facilities using a graded approach as specified by DOE O 420.1, Facility Safety and associated NPH Guide G 420.1-2.

  7. DOE-HDBK-6004-99

    Office of Energy Efficiency and Renewable Energy (EERE)

    Supplementary Guidance and Design Experience for the Fusion Safety Standards DOE-STD-6002-96 and DOE-STD-6003-96 The first of these standards identifies requirements that subscribers to that standard must meet to achieve safety in fusion facilities. The second standard contains guidance to assist in meeting the requirements identified in the first.

  8. DOE-HDBK-1139/3-2005

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chemical Management Replaced by DOE-HDBK-1139/3-2008 This chapter identifies and consolidates existing user safety and health requirements found in DOE and Federal chemical-related safety and health regulations and National Standards that address hazard analysis of activities involving chemicals (see definition) and chemical products (see definition). State and local codes and requirements are NOT included.

  9. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  10. Microsoft Word - S07566_Requirements

    Office of Environmental Management (EM)

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  11. DOE Employment - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management DOE Employment About Us DOE Human Resources Management Division DOE Employment Recognition and Awards Program Federal Employees Union (AFGE Local 788) Work Schedules ...

  12. EDX | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EDX In February 2013 an Obama Administration, Office for Science and Technology Policy (OSTP) directive and subsequent DOE orders aligning to this directive, required data resulting from federally funded research to be shared and preserved via public, online systems. For DOE Fossil Energy related research, NETL's Energy Data eXchange (EDX) serves as this data collection, management and discovery system. EDX is available to host research results, when they are appropriate for public distribution,

  13. DOE Order on Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order,

  14. NEW- DOE O 325.2, Position Management and Classification - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEW- DOE O 325.2, Position Management and Classification by Website Administrator The order establishes departmental requirements and responsibilities for classifying positions...

  15. DOE-TSPP-8-2013, Converting DOE Technical Standards to Voluntary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and laboratories (hereafter referred to collectively as Technical Standards Program (TSP) participants) working to the requirements of the latest revision of DOE Order (O)...

  16. DOE Order 451.1B: NEPA Compliance Program (DOE, 2012)

    Broader source: Energy.gov [DOE]

    The purpose of this Order is to establish DOE internal requirements and responsibilities for implementing the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality...

  17. Animation Requirements

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  18. DOE Zero Energy Ready Home Recommended Quality Management Provisions |

    Energy Savers [EERE]

    Department of Energy Recommended Quality Management Provisions DOE Zero Energy Ready Home Recommended Quality Management Provisions DOE Zero Energy Ready Home Recommended Quality Management Provisions. PDF icon QM Cheklist.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) Washington DOE ZERH Program Requirements DOE Zero Energy Ready Home Solar Hot Water-Ready Checklist

  19. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  20. DOE-STD-3020-2015 | Department of Energy

    Energy Savers [EERE]

    15 DOE-STD-3020-2015 June 2015 Specification for HEPA Filters Used by DOE Contractors Supersedes DOE-STD-3020-2005 (December 2005) The purpose of this standard is to establish specifications and quality assurance (QA) requirements for the procurement, packaging, shipping and storage of high efficiency particulate air (HEPA) filters. PDF icon DOE-STD-3020-2015, Specification for HEPA Filters Used by DOE Contractors More Documents & Publications DOE-STD-3020-2005 Standards

  1. DOE Cooperative Research and Development Agreements | Department of Energy

    Office of Environmental Management (EM)

    Cooperative Research and Development Agreements DOE Cooperative Research and Development Agreements To establish Department of Energy (DOE) policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. PDF icon DOE O 483.1 More Documents & Publications DOE M 483.1-1 DOE Order 482.1 Acquisition Letter No. AL 2012-09

  2. DOE Wind Program Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Program Update March 2007 P.J. Dougherty Wind and Hydropower Technologies Program Since the 1970's, DOE has spent just over $1B in developing a market, which will reach over $4B in commercial investment in 2006 alone. Energy Efficiency & Renewable Energy Program works closely with industry to provide the market transformation support and R&D needed to drive wind development. Motivating Factors * U.S. Energy Demand to Increase 40%+ over next 25 Years * $Billions investment required *

  3. DOE CONTRACTOR PENSION PLANS

    Energy Savers [EERE]

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  4. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  5. DOE CONTRACTOR PENSION PLANS

    Office of Environmental Management (EM)

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  6. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  7. Eligibility Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligibility and required supporting documentation The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to enroll in the HDHP medical plan. NOTE:

  8. Competition Requirements

    Office of Environmental Management (EM)

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  9. Westinghouse ICF power plant study

    SciTech Connect (OSTI)

    Sucov, E. W.

    1980-10-01

    In this study, two different electric power plants for the production of about 1000 MWe which were based on a CO/sub 2/ laser driver and on a heavy ion driver have been developed and analyzed. The purposes of this study were: (1) to examine in a self consistent way the technological and institutional problems that need to be confronted and solved in order to produce commercially competitive electricity in the 2020 time frame from an inertial fusion reactor, and (2) to compare, on a common basis, the consequences of using two different drivers to initiate the DT fuel pellet explosions. Analytic descriptions of size/performance/cost relationships for each of the subsystems comprising the power plant have been combined into an overall computer code which models the entire plant. This overall model has been used to conduct trade studies which examine the consequences of varying critical design values around the reference point.

  10. Westinghouse Accident Tolerant Fuel Program

    SciTech Connect (OSTI)

    Xu, Peng

    2013-08-21

    The PowerPoint presentation includes a timeline for the program implementation, the technical approach taken, a summary of testing results, a status of task 2, what has been done to share the results so far, and a summary of upcoming work.

  11. ATTENDEEES: Ashley Armstrong, DOE Laura Barhydt DOE Eric Stas, DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ATTENDEEES: Ashley Armstrong, DOE Laura Barhydt DOE Eric Stas, DOE Francine Pinto, DOE R. Bruce Carnevale, Bradford White Corporation Mark Taylor, Bradford White Corporation Adam S. Olsen, Sconset Strategies, LLC on behalf of Bradford White Corporation MEETING DATE: Tuesday, March 24, 2015 SUBJECTS DISCUSSED: Notice of proposed rulemaking establishing a mathematical conversion factor for consumer water heaters and certain commercial water heaters, specifically: 1.) NOPR release date and the

  12. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 43.2 (August 2013) Change Order Administration References * FAR Subpart 43.2, "Change Orders" * Policy Flash 2008-39, "Contract Change Order Administration of Department of Energy (DOE) Prime Contracts" * Acquisition Guide 15.4-1, "Pricing Contract Modifications" Overview This chapter provides guidance to ensure the proper issuance and administration of change orders. A change order template and sample clauses are provided in order to facilitate consistent

  13. Competition Requirements

    Office of Environmental Management (EM)

    Chapter 43.2 (August 2013) Change Order Administration References * FAR Subpart 43.2, "Change Orders" * Policy Flash 2008-39, "Contract Change Order Administration of Department of Energy (DOE) Prime Contracts" * Acquisition Guide 15.4-1, "Pricing Contract Modifications" Overview This chapter provides guidance to ensure the proper issuance and administration of change orders. A change order template and sample clauses are provided in order to facilitate consistent

  14. Data Provision Instructions for All DOE Geothermal Technologies Office

    Office of Environmental Management (EM)

    Funds Recipients | Department of Energy Data Provision Instructions for All DOE Geothermal Technologies Office Funds Recipients Data Provision Instructions for All DOE Geothermal Technologies Office Funds Recipients DATA PROVISION INSTRUCTIONS FOR ALL DOE GEOTHERMAL TECHNOLOGIES OFFICE FUNDS RECIPIENTS As required by DOE Geothermal Technologies Office (GTO) Funding Opportunity Announcements for Financial Assistance awards, all GTO funds recipients including national laboratories must provide

  15. Preparing a DOE SBIR/STTR Phase I Grant Application | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) a DOE SBIR/STTR Phase I Grant Application Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR/STTR Home About Funding Opportunity Announcements (FOAs) Applicant and Awardee Resources Quick Links DOE SBIR Online Learning Center External link DOE Phase 0 Small Business Assistance External link Preparing and Submitting a Phase I Letter of Intent Preparing a DOE SBIR/STTR Phase I Grant Application Additional Requirements and Guidance for

  16. Order Module--DOE STD-1098-2008, DOE STANDARD: RADIOLOGICAL CONTROL |

    Energy Savers [EERE]

    Department of Energy STD-1098-2008, DOE STANDARD: RADIOLOGICAL CONTROL Order Module--DOE STD-1098-2008, DOE STANDARD: RADIOLOGICAL CONTROL "The radiological control program discussed in DOE-STD-1098-2008 goes beyond the scope of, and includes more details than, the documented radiation protection program (RPP) required by 10 CFR 835, -Occupational Radiation Protection.‖ To ensure implementation of a comprehensive and coherent radiological control program that exceeds basic

  17. DRAFT - DOE G 580.1-1A, Personal Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides non-regulatory guidance and information to assist DOE organizations and contractors in implementing the DOE-wide and site-specific personal property management programs. It supplements the policy, requirements, and responsibilities information contained in the DOE Order cited above and clarifies the regulatory requirements contained in the Federal Property Management Regulation (FMR) and specific contracts.

  18. Data Crosscutting Requirements Review

    SciTech Connect (OSTI)

    Kleese van Dam, Kerstin; Shoshani, Arie; Plata, Charity

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  19. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. ...

  20. DOE Standard: Fire protection design criteria

    SciTech Connect (OSTI)

    Not Available

    1999-07-01

    The development of this Standard reflects the fact that national consensus standards and other design criteria do not comprehensively or, in some cases, adequately address fire protection issues at DOE facilities. This Standard provides supplemental fire protection guidance applicable to the design and construction of DOE facilities and site features (such as water distribution systems) that are also provided for fire protection. It is intended to be used in conjunction with the applicable building code, National Fire Protection Association (NFPA) Codes and Standards, and any other applicable DOE construction criteria. This Standard replaces certain mandatory fire protection requirements that were formerly in DOE 5480.7A, ``Fire Protection``, and DOE 6430.1A, ``General Design Criteria``. It also contains the fire protection guidelines from two (now canceled) draft standards: ``Glove Box Fire Protection`` and ``Filter Plenum Fire Protection``. (Note: This Standard does not supersede the requirements of DOE 5480.7A and DOE 6430.1A where these DOE Orders are currently applicable under existing contracts.) This Standard, along with the criteria delineated in Section 3, constitutes the basic criteria for satisfying DOE fire and life safety objectives for the design and construction or renovation of DOE facilities.

  1. The DOE NEPA process

    SciTech Connect (OSTI)

    Van Ooteghem, S.A.

    1993-09-01

    A brief overview indicating the types Of NEPA documents that are produced by the Department of Energy (DOE) in compliance with NEPA is shown in the figure. This figure indicates that the level of NEPA documentation required for any given project is graded and dependent on that project`s size, complexity, and potential consequences to health and the human environment. More complex projects with potentially greater environmental impacts require a much more in-depth analysis to ensure that these potential consequences can be managed and/or mitigated, so that the proposed project can proceed in compliance with NEPA. It is important to keep in mind the following points when conducting any project that involves Federal land, Federal monies, or Federal permits: Under these conditions (involvement of Federal lands, use of Federal monies, or requirement for Federal permits), some level of NEPA analysis and documentation is required. The NEPA process must be completed and a decision favorable to the proposed project must be supported by the NEPA analysis before that proposed project can fully expend Federal funds. Activities that cannot proceed until the NEPA analysis and decision-making process is completed are those that: Result in an adverse environmental impact and/or limit the choice of reasonable alternatives.

  2. Cyber Security Requirements for Wireless Devices and Information Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-11

    The Notice establishes DOE policy requirements and responsibilities for using wireless networks and devices within DOE and implements the requirements of DOE 0 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, including requirements for cyber resource protection, risk management, program evaluation, and cyber security plan development and maintenance. No cancellation. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  3. Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-03

    This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Cancels DOE G 423.1-1.

  4. Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-03

    This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Does not cancel other directives.

  5. Order Module--DOE Order 225.1B, ACCIDENT INVESTIGATIONS

    Broader source: Energy.gov [DOE]

    DOE O 225.1B prescribes organizational responsibilities, authorities, and requirements for conducting investigations of certain accidents occurring at DOE sites, facilities, areas, operations, and...

  6. DOE Challenge Home Recommended Quality Management Provisions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommended Quality Management Provisions RECOMMENDED QUALITY MANAGEMENT PROVISIONS QM Provision Builder Documentation & Verification Requirements Rater/Verifier Requirements QM #1: Project Documentation Complete construction documents shall be qualified as Designed to Earn ENERGY STAR and document all additional provisions and specifications required for DOE Challenge Home including mandatory provisions: 2012 IECC envelope insulation levels, ENERGY STAR windows, duct work in conditioned

  7. DOE PAGES Beta

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    portal to journal articles and accepted manuscripts resulting from DOE-funded research DOE PAGES Beta is the DOE response to the February 2013 White House Office of Science and...

  8. DOE-STD-1128-2013

    Broader source: Energy.gov [DOE]

    Good Practices for Occupational Radiological Protection in Plutonium Facilities This Technical Standard (TS) does not contain any new requirements. Its purpose is to provide information on good practices, update existing reference material, and discuss practical lessons learned relevant to the safe handling of plutonium. U.S. Department of Energy (DOE) health physicists may adapt the recommendations from this TS to similar situations throughout the DOE complex.

  9. DOE / Contractor Resources | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE / Contractor Resources As a Department of Energy National Laboratory operated under Contract DE-AC02-07CH11358 by Iowa State University, the Ames Laboratory is required to prepare and submit various Planning and Performance documents for review and approval to the DOE. Included herein are some of those documents that are or may be of interest to our constituents. The Lab Plan is an annual document submitted to the DOE that discusses our mission, core capabilities and infrastructure. The

  10. DOE-STD-1111-98

    Broader source: Energy.gov [DOE]

    Laboratory Accreditation Program Administration Replaced by DOE-STD-1111-2013 The purpose of this technical standard is to establish procedures for administering DOELAP and acquiring accreditation. Specific performance testing requirements and site assessment criteria for accreditation are contained in: DOE-STD-1095-95, “Department of Energy Laboratory Accreditation Program for Personnel Dosimetry Systems” and DOE-STD-1112-98, “Department of Energy Laboratory Accreditation for Radiobioassay.”

  11. Microsoft Word - DOE Initiates EPA Recertificaton Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Initiates EPA Recertification Process CARLSBAD, N.M., March 24, 2009 - Ten years after the start of disposal operations, the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) will demonstrate its continued compliance with U. S. Environmental Protection Agency (EPA) regulations for radioactive waste disposal. Today, DOE submitted its second Compliance Recertification Application (CRA) to EPA, initiating a recertification process required by Congress. "This application is

  12. DOE-HDBK-1122-2009

    Broader source: Energy.gov [DOE]

    Radiological Control Technician Training Replaced by DOE-HDBK-1122-2009, Part 1: Radiological Control Technician Training and Part 5: Radiological Control Technician Training, Site Academic Training Instructors Guide Phase I, Part 6: Radiological Control Technician Training This guide defines and describes the DOE Radiological Control Technician (RCT) Core Training & Qualification Program, material development requirements, standards and policies, and administration. The guide applies to RCT Training & Qualification Programs at all DOE sites

  13. DOE International Energy Advisors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE International Energy Advisors DOE International Energy Advisors Energy is a critical operational requirement and cornerstone of planning and logistics for the Department of Defense (DOD). It is also part of the strategic context in which the Combatant Commands (COCOMs) partner and operate. Since 2006, DOD has been facilitating an interagency environment in the COCOM headquarters. DOE's Office of Electricity Delivery and Energy Reliability's (OE) Infrastructure Security and Energy

  14. DOE F 4220.2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE F 4220.2 Form required for procurements with estimated values exceeding the simplified acquisition threshold (see FAR 2.101). PDF icon DOE F 4220 2 Small Business Review - ...

  15. DOE F 3731.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1.1 DOE F 3731.1 Form documents sensitivity level and access requirements based on the ... PDF icon POSITION SENSITIVITY LEVEL DESIGNATION More Documents & Publications DOE F 3305.2 ...

  16. LG Dismisses Lawsuit against DOE over Energy Star Enforcement

    Broader source: Energy.gov [DOE]

    DOE announced today that LG Electronics voluntarily dismissed its lawsuit against DOE over the Department's decision to require LG to use the same energy efficiency tests as other manufacturers and...

  17. NEW - DOE O 452.2E, Nuclear Explosive Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Department of Energy (DOE) Order establishes requirements to implement the nuclear explosive safety (NES) elements of DOE O 452.1D, Nuclear Explosive and Weapon Surety Program, or successor directive, for routine and planned nuclear explosive operations (NEOs).

  18. Human Genome: DOE Origins

    Office of Scientific and Technical Information (OSTI)

    of the Department of Energy; DOE Technical Report; 1988 Mapping and Sequencing the Human Genome; DOE Technical Report; 1988 Understanding our Genetic Inheritance: The U.S....

  19. DOE Zero Energy Ready Home

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California Program Requirements (Rev. 05) May 18, 2015 These Program Requirements shall only be used in the State of California. Note that the "Rev. 05" specification number jumped from the original requirements for California (Rev.01) up to Rev. 05, to align the revision # with the national specifications. Effective for Homes in California Revised May 18, 2015 Page 1 of 12 Permitted Starting 8/11/2015 To qualify as a DOE Zero Energy Ready Home, a home shall meet the minimum

  20. Notice of Intent to Issue DOE N 314.1, DOE-Flex: DOE's Telework Program while Developing a Successor Order (5-6-11)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-06

    This is to develop DOE N 3XX, which will establish the requirements and responsibilities for the Department's telework/flexiplace program.

  1. DOE-STD-1031-92

    Broader source: Energy.gov [DOE]

    Guide to Good Practices for Communications Change Notice No. 1 (December 1998) | Reaffirmed 2001 This Guide to Good Practices is written to enhance understanding of, and provide direction for, Communications, Chapter IV of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing communication programs.

  2. DOE-STD-1032-92

    Office of Energy Efficiency and Renewable Energy (EERE)

    Guide to Good Practices for Operations Organization and Administration Change Notice 1 (December 1998) | Reaffirmed 2001 This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Organization and Administration, Chapter I of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities.

  3. DOE-STD-1128-2008

    Broader source: Energy.gov [DOE]

    Guide of Good Practices for Occupational Radiological Protection in Plutonium Facilities Replaced by DOE-STD-1128-2013 This Technical Standard (TS) does not contain any new requirements. Its purpose is to provide a guide to good practice, update existing reference material, and discuss practical lessons learned relevant to the safe handling of plutonium.

  4. DOE-STD-1128-98

    Broader source: Energy.gov [DOE]

    Guide of Good Practices for Occupational Radiological Protection in Plutonium Facilities Replaced by DOE-STD-1128-2008 | Reaffirmation with Errata (May 2003) | Change Notice 2 (December 2006) This Technical Standard (TS) does not contain any new requirements. Its purpose is to provide guides to good practice, update existing reference material, and discuss practical lessons learned relevant to the safe handling of plutonium.

  5. DOE-STD-1128-98

    Broader source: Energy.gov [DOE]

    Guide of Good Practices for Occupational Radiological Protection in Plutonium Facilities Replaced by DOE-STD-1128-98 | Reaffirmation with Errata (May 2003) | Change Notice 1 (February 2005) This Technical Standard (TS) does not contain any new requirements. Its purpose is to provide guides to good practice, update existing reference material, and discuss practical lessons learned relevant to the safe handling of plutonium.

  6. DOE-STD-1150-2002

    Broader source: Energy.gov [DOE]

    Quality Assurance Functional Area Qualification Standard Replaced by DOE-1150-2013 This QA Functional Area Qualification Standard establishes common functional area competency requirements for DOE personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical QA activities impacting the safe operation of defense nuclear facilities.

  7. DOE-STD-1166-2003

    Office of Energy Efficiency and Renewable Energy (EERE)

    Deactivation and Decommission Functional Area Qualification Standard The Deactivation and Decommissioning Functional Area Qualification Standard establishes common functional area competency requirements for Department of Energy personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities that could impact the safe operation of DOEs defense nuclear facilities.

  8. DOE-STD-1165-2003

    Broader source: Energy.gov [DOE]

    Aviation Manager Functional Area Qualification Standard Replaced by DOE-STD-1165-2003 The Aviation Manager Functional Area Qualification Standard establishes common functional area competency requirements for Department of Energy aviation managers who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities impacting the safe, effective, secure and efficient operation of DOE facilities.

  9. Extension of DOE N 470.5

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-09-28

    DOE N 470.5, Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, dated 8-12-09 is extended until 9-28-11. Requirements in the Notice will be integrated into a new DOE Order, Personnel Security, which is currently under development.

  10. DOE-STD-1157-2002

    Broader source: Energy.gov [DOE]

    Environmental Restoration Functional Area Qualification Standard The Environmental Restoration Functional Area Qualification Standard establishes common functional area competency requirements for Department of Energy personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities impacting the safe operation of DOEs most hazardous facilities.

  11. DOE-STD-1156-2002

    Broader source: Energy.gov [DOE]

    Environmental Compliance Functional Area Qualification Standard The Environmental Compliance Functional Area Qualification Standard establishes common functional area competency requirements for Department of Energy personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical activities impacting the safe operation of DOEs most hazardous facilities.

  12. DOE-STD-3015-2001

    Broader source: Energy.gov [DOE]

    Nuclear Explosive Safety Study Process Superseding DOE-STD-3015-97 (January 1997) This technical standard provides specific requirements and guidance for nuclear explosive safety (NES) studies and is in accordance with DOE Order 452.2B, SAFETY OF NUCLEAR EXPLOSIVE OPERATIONS

  13. DOE-ER-STD-6001-92

    Broader source: Energy.gov [DOE]

    Implementation Guide for Quality Assurance Programs for Basic and Applied Research Canceled (January, 2003) This Implementation Guide is intended to assist management at DOE-ER sponsored facilities in the process of developing and implementing Quality Assurance Programs (QAPs) that satisfy the requirements of DOE Order 5700.6C.

  14. DOE-STD-1195-2011

    Broader source: Energy.gov [DOE]

    Design of Safety Significant Safety Instrumented Systems Used at DOE Non-Reactor Nuclear Facilities This standard provides requirements and guidance for the design, procurement, installation, testing, maintenance, operation, and quality assurance of safety instrumented systems (SIS) that may be used at Department of Energy (DOE) nonreactor nuclear facilities for safety significant (SS) functions.

  15. Crosswalk Tables: DOE O 5820.2A vs. DOE O 435.1/M 435.1-1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    These crosswalk tables have been prepared to assist in understanding how the requirements that are currently in 5820.2A are addressed in the DOE O 435.1 and DOE M 435.1-1.

  16. DOE Annual Site Environmental Reports (ASER) | Department of Energy

    Energy Savers [EERE]

    Services » Environment » Radiation Protection of the Public and the Environment » DOE Annual Site Environmental Reports (ASER) DOE Annual Site Environmental Reports (ASER) ASERs are required by DOE O 231.1B. The ASERs provide important information needed by site managers and DOE Headquarters to assess field environmental program performance, site-wide environmental monitoring and surveillance effectiveness, and confirm compliance with environmental standards and requirements. They are also

  17. DOE Approved Technical Standards | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    DOE, the performance of chemical process hazards analyses (PrHAs) as required under the PSM Rule. It provides basic information for the performance of PrHAs, and should not be...

  18. DOE-STD-1150-2013

    Broader source: Energy.gov [DOE]

    Quality Assurance Functional Area Qualification Standard The Quality Assurance (QA) Functional Area Qualification Standard (FAQS) establishes common functional area competency requirements for all DOE QA personnel who provide assistance,

  19. DOE-HDBK-1211-2014

    Broader source: Energy.gov [DOE]

    Activity-Level Work Planning and Control Implementation This Handbook describes non-mandatory approaches for implementing Department of Energy (DOE) requirements for activity-level work planning and control (WP&C).

  20. DOE Grand Junction Projects Office Edgemont LTSP

    Office of Legacy Management (LM)

    DOE Grand Junction Projects Office Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ....................................................................................................................................... 1 1.1 Purpose ..................................................................................................................................... 1 1.2 Legal and Regulatory Requirements

  1. DOE Order on Quality Assurance | Department of Energy

    Energy Savers [EERE]

    Quality Assurance » DOE Order on Quality Assurance DOE Order on Quality Assurance The purpose of this order is to ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. PDF icon DOE Order on Quality Assurance More Documents & Publications Order Module--DOE O 414.1D, QUALITY ASSURANCE Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY

  2. DOE-HDBK-1203-97 | Department of Energy

    Energy Savers [EERE]

    3-97 DOE-HDBK-1203-97 April 07, 2007 Guide to Good Practices for Training of Technical Staff and Managers Canceled, Effective February 2016 | Supersedes DOE-STD-1008-92 (July 1992) Training programs at Department of Energy (DOE) facilities should prepare personnel to safely and efficiently operate the facilities in accordance with DOE requirements. This guide contains information that can be used to develop or validate training programs for technical staff and managers at DOE nuclear facilities.

  3. DOE-SPEC-3018-96 | Department of Energy

    Energy Savers [EERE]

    8-96 DOE-SPEC-3018-96 September 12, 1996 DOE Specification, Flooded-Type Lead-Acid Storage Batteries Canceled This specification defines requirements for flooded-type, lead-acid storage batteries and accessory equipment for [general purpose] [uninterruptible power supply (UPS)] [ ] applications, for [ ], located in [ ] PDF icon DOE-SPEC-3018-96, DOE Specification, Flooded-Type Lead-Acid Storage Batteries More Documents & Publications DOE-SPEC-3019

  4. DOE-STD-1066-2012 | Department of Energy

    Energy Savers [EERE]

    2012 DOE-STD-1066-2012 December 05, 2012 Fire Protection Supersedes DOE-STD-1066-99 This Standard was developed to provide acceptable methods and approaches for meeting DOE fire protection program and design requirements and to address special or unique fire protection issues at DOE facilities that are not comprehensively or adequately addressed in national consensus standards or other design criteria. PDF icon DOE-STD-1066-2012, Fire Protection More Documents & Publications Revisions to the

  5. Order DOE O 205.1B | Department of Energy

    Office of Environmental Management (EM)

    Order DOE O 205.1B Order DOE O 205.1B To set forth requirements and responsibilities for a Departmental Cyber Security Program (CSP) that protects information and information systems for the Department of Energy (DOE) PDF icon DOE O 205.1B Chg 2.pdf More Documents & Publications DOE O 205.1B Reference List Part I, DAA Overview ; AODR Role-Based Training Information Management Governance Council

  6. DOE Qualified List of Energy Service Companies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Qualified List of Energy Service Companies DOE Qualified List of Energy Service Companies Document presents the current U.S. Department of Energy (DOE) Qualified List of Energy Service Companies (ESCOs). The DOE Qualified List of ESCOs is required by the Energy Policy Act of 1992 (as implemented by 10 CFR 436.32). It is the initial component of the federal government's multi-tiered ESCO evaluation for energy savings performance contracting (ESPC) procurements. The DOE Qualified List

  7. Federal Register Notices for DOE NEPA Guidelines and Regulations |

    Office of Environmental Management (EM)

    Department of Energy Notices for DOE NEPA Guidelines and Regulations Federal Register Notices for DOE NEPA Guidelines and Regulations Historical compilation of Federal Register notices for DOE NEPA guidelines and regulations. PDF icon DOE-NEPA-Guidelines-and-Regulations--1978-2011.pdf More Documents & Publications DOE NEPA Guidance and Requirements - Search Index - List of Contents EPA's Section 309 Review: The Clean Air Act and NEPA EPA's Section 309 Review: The Clean Air Act and NEPA

  8. DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) |

    Office of Environmental Management (EM)

    Department of Energy 64603) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE's power marketing activities, based on DOE's experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time, while

  9. DOE F 3511.1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . ORGANIZATION CODE 5. SENSITIVITY (Circle Number) 6. FINANCIAL STATEMENT REQUIRED (Circle) 21. FUNCTIONAL CLASS CODE FOR SCIENTISTS AND ENGINEERS 25. Comp. Level 25. Comp. Area Signature 28. Agency Code 17. Pay Plan Classification Title (continued) 13. DOE F 3511.1 (06-94) (Formerly DOE F 3200.5) U.S. DEPARTMENT OF ENERGY POSITION DESCRIPTION To be completed by Personnel 1. POSITION NUMBER 3. ACTION (Circle Letter) A=ADD C=CHG D=DEL PART I: TO BE COMPLETED BY THE INITIATING OFFICE 4.

  10. The DOE NEPA process

    SciTech Connect (OSTI)

    Van Ooteghem, S.A.

    1993-06-01

    The National Environmental Policy Act (NEPA) declares that Federal agencies shall have a general commitment to {open_quotes}use all practicable means{close_quotes} to conduct their activities in a way that will promote {open_quotes}the general welfare where man and nature can exist in productive harmony.{close_quotes} Within these general guidelines, the manner in which NEPA requirements are implemented may be somewhat different and unique from one Federal agency to the next. A brief overview indicating the types of NEPA documents that are produced by the Department of Energy (DOE) in compliance with NEPA is shown in the figure. This figure indicates that the level of NEPA documentation required for any given project is graded and dependent on that project`s size, complexity, and potential consequences to health and the human environment. More complex projects with potentially greater environmental impacts require a much more in-depth analysis to ensure that these potential consequences can be managed and/or mitigated, so that the proposed project can proceed in compliance with NEPA.

  11. DOE-STD-1077-94 | Department of Energy

    Energy Savers [EERE]

    7-94 DOE-STD-1077-94 June 13, 1996 Training Accreditation Program Standard: Requirements and Guidelines Canceled | Supercedes DOE-STD-0101T, TAP-1, and DOE-STD-0103T, TAP-3 The purpose of this Standard is to provide requirements, information, and guidance for the effective implementation of the DOE Training Accreditation Program established by DOE Order 5480.18B, "Nuclear Facility Training Accreditation Program." PDF icon DOE-STD-1077-94, Training Accreditation Program Standard:

  12. Implementation Guide for DOE Fire Protection and Emergency Services Programs for Use with DOE O 420.1B, Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-09-27

    This Guide facilitates the implementation of requirements of DOE O 420.1B by providing an acceptable approach to meet the requirements for Fire Protection Programs. Cancels DOE G 440.1-5.

  13. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  14. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  15. Competition Requirements

    Office of Environmental Management (EM)

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  16. Competition Requirements

    Office of Environmental Management (EM)

    ---------------------------- --------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement

  17. DOE Lessons Learned

    Broader source: Energy.gov [DOE]

    DOE Lessons Learned Information Services Catches the Eye of Corporations and Educational Institutions

  18. DOE occupational radiation exposure 1996 report

    SciTech Connect (OSTI)

    1996-12-31

    The goal of the US Department of Energy (DOE) is to conduct its radiological operations to ensure the health and safety of all DOE employees including contractors and subcontractors. The DOE strives to maintain radiation exposures to its workers below administrative control levels and DOE limits and to further reduce these exposures and releases to levels that are ``As Low As Reasonably Achievable`` (ALARA). The DOE Occupational Radiation Exposure Report, 1996 provides summary and analysis of the occupational radiation exposure received by individuals associated with DOE activities. The DOE mission includes stewardship of the nuclear weapons stockpile and the associated facilities, environmental restoration of DOE and precursor agency sites, and energy research. Collective exposure at DOE has declined by 80% over the past decade due to a cessation in opportunities for exposure during the transition in DOE mission from weapons production to cleanup, deactivation and decommissioning, and changes in reporting requirements and dose calculation methodology. In 1996, the collective dose decreased by 10% from the 1995 value due to decreased doses at five of the seven highest-dose DOE sites. For 1996, these sites attributed the reduction in collective dose to the completion of several decontamination and decommissioning projects, reduced spent fuel storage activities, and effective ALARA practices. This report is intended to be a valuable tool for managers in their management of radiological safety programs and commitment of resources.

  19. DOE/PC/88921--5

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/PC/88921--5 _)/ DE91 004343 DOE Technical Report No. DOE/PC/88921-5 Filth Quarterly Report on Research Grant No. DE-FG22-88PC88921 Title: SPIN-MAPPING OF COAL STRUCTURES WITH ESE AND ENDOR #._; Principal Investigators: R. L. Bellord and R. B. Clarkson ct"_, _' Institution: University of Illinois at Urbana-Champaign Date: December 1, 1989 t. US/DOE Patent Clearance is _ required prior to publication o! this document, " ABSTRACT The broad goals oi this project are Lodetermine by

  20. DOE-STD-1020-2012

    Broader source: Energy.gov [DOE]

    Natural Phenomena Hazards Analysis and Design Criteria for Department of Energy Facilities Supersedes DOE-STD-1020-2002 This Department of Energy (DOE) Standard (STD)-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities, provides criteria and guidance for the analysis and design of facility structures, systems, and components (SSCs) that are necessary to implement the requirements of DOE Order (O) 420.1C, Facility Safety, and to ensure that the SSCs will be able to effectively perform their intended safety functions under the effects of natural phenomena hazards (NPHs).

  1. Order Module--DOE-STD-3009-94, PREPARATION GUIDE FOR U.S. DEPARTMENT...

    Energy Savers [EERE]

    Department of Energy Nonreactor Nuclear Facilities Documented Safety Analyses More Documents & Publications DOE-STD-3009-94 DOE-STD-3009-94 DOE-STD-3009-2014 Requirements Matrix...

  2. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  3. DOE Zero Energy Ready Home Solar Hot Water-Ready Checklist |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Hot Water-Ready Checklist DOE Zero Energy Ready Home Solar Hot Water-Ready Checklist DOE Zero Energy Ready Home National Program encourages, but does not require, ...

  4. Nonreactor Nuclear Safety Design Guide for use with DOE O 420.1C, Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-04

    This Guide provides an acceptable approach for safety design of DOE hazard category 1, 2 and 3 nuclear facilities for satisfying the requirements of DOE O 420.1C. Supersedes DOE G 420.1-1.

  5. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  6. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  7. DOE-STD-1104-96

    Broader source: Energy.gov [DOE]

    Review and Approval of Nuclear Facility Safety Basis Documents (Documented Safety Analysis and Technical Safety Requirements) Replaced by DOE-STD-1104-2009 |CHANGE NOTICE NO. 3 (December 2005) First of many: The following guiding principles pertain to the application and provisions of this Standard. · The documents (i.e., DOE orders, manuals, guides, and standards) listed in Table 2 of Appendix A to 10 CFR 830 Subpart B provide approved methodologies for meeting the DSA requirements of 10 CFR 830. Developed consistent with and as a companion to these documents, this standard does not reiterate the provisions of these documents.

  8. DOE/RL-96-68

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Hanford Analytical Services Quality Assurance Requirements Document Volume 1: Administrative Requirements Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, Washington 99352 Approved for Public Release; Further Dissemination Unlimited DOE/RL-96-68 Revision 4 Volume 1 Hanford Analytical Services Quality Assurance Requirements Document Volume 1: Administrative Requirements Date Published September 2014 Prepared for the U.S.

  9. DOE/RL-96-68

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Hanford Analytical Services Quality Assurance Requirements Document Volume 2: Sampling Technical Requirements Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, Washington 99352 Approved for Public Release; Further Dissemination Unlimited DOE/RL-96-68 Revision 4 Volume 2 Hanford Analytical Services Quality Assurance Requirements Document Volume 2: Sampling Technical Requirements Date Published September 2014 Prepared for the U.S.

  10. DOE/RL-96-68

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Hanford Analytical Services Quality Assurance Requirements Document Volume 3: Field Analytical Technical Requirements Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, Washington 99352 Approved for Public Release; Further Dissemination Unlimited DOE/RL-96-68 Revision 4 Volume 3 Hanford Analytical Services Quality Assurance Requirements Document Volume 3: Field Analytical Technical Requirements Date Published September 2014

  11. DOE/RL-96-68

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Hanford Analytical Services Quality Assurance Requirements Document Volume 4: Laboratory Technical Requirements Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, Washington 99352 Approved for Public Release; Further Dissemination Unlimited DOE/RL-96-68 Revision 4 Volume 4 Hanford Analytical Services Quality Assurance Requirements 'RFXPHQW Volume 4: Laboratory Technical Requirements Date Published September 2014 Prepared for the

  12. DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The primarily firm-fixed-price nature of the contract will allow DOE to hold the contractor accountable for meeting the contract requirements. Infrastructure support services to be ...

  13. DOE Partners with Other Federal Agencies Working on the Wind...

    Broader source: Energy.gov (indexed) [DOE]

    Bill Presenting Joint Mtg.jpg LM Site Manager, Bill Dam, presenting objectives and ... Bill Dam, LM Riverton Site Manager, talked about DOE's requirements for financial ...

  14. Draft - DOE O 325.3, Staffing and Placement

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order establishes requirements and responsibilities for recruiting and staffing all competitive positions and General Schedule excepted service positions under Schedule A, B, and D at DOE.

  15. DOE Zero Energy Ready Home Recommended Quality Management Provisions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Provisions. PDF icon QM Cheklist.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03)...

  16. DOE Standard Integration Of Environment,Safety, and Health Into...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated safety management expectations are provided in accordance with facility disposition requirements contained in DOE O 430.1B, Real Property Asset Management. PDF icon ...

  17. Microsoft Word - DOE-ID-INL-14-003.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of DOE or Executive Orders; 2) require siting and construction or major expansion of waste storage, disposal, recovery, or treatment or facilities; 3) disturb hazardous...

  18. DRAFT - DOE O 333.1, Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    To provide requirements and responsibilities for administering workforce discipline that includes disciplinary, adverse, and alternative corrective actions in the Department of Energy (DOE).

  19. Indian Country Solar Energy Potential Estimates & DOE IE Updates

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to projects that the private sector may not finance * Good AK Agencies to Know and Follow - AEA, AHFC, Rural Development, HUD, EPA, DOI, DOE Private Money * Requires good ...

  20. Funding Opportunity Announcements (FOAs) | U.S. DOE Office of...

    Office of Science (SC) Website

    The Office of Science requires that all applications for financial assistance be submitted ... The Office of Science does not accept unsolicited applications for financial assistance. ...

  1. Cyber Security Requirements for Risk Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-19

    The Notice ensures that system owners consistently assess the threats to and vulnerabilities of systems in order to implement adequate security controls. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, and protect DOE information and information systems from unauthorized access, use, disclosure, modification, or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  2. index | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advanced NOx Emissions Control DOE/NETL's NOx Emissions Control R&D Program - Bringing Advanced Technology to the Marketplace - April 2008 [PDF-346KB] Commercially available technologies for reducing nitrogen oxide (NOx) emissions from coal-fired boilers are enabling industry compliance with today's regulatory requirements. Low-NOx burners and selective catalytic reduction (SCR) technology have enabled hundreds of power plants to reach mandated emission levels. For a number of plants,

  3. Joint DOE-Rosatom Statement

    Office of Environmental Management (EM)

    Joint Statement on the U.S. - Russian Excess Weapon-grade Plutonium Disposition Program The U.S. Department of Energy (DOE) and the Federal Atomic Energy Agency, Russian Federation (Rosatom), as the Executive Agents for the implementation of the 2000 Plutonium Management and Disposition Agreement, hereby reaffirm their commitment to implementing the 2000 Agreement and effective and transparent disposition of 34 metric tons each of weapon- grade plutonium designated as no longer required for

  4. DOE - Office of Legacy Management

    Office of Legacy Management (LM)

    Weldon Spring Site Five-Year Review Survey Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) requires that remedial actions, which result in any hazardous substances, pollutants, or contaminants remaining at a site be subject to a five-year review. The U.S. Department of Energy (DOE) is currently conducting its fourth five-year review at the Weldon Spring, Missouri,

  5. DOE Zero Energy Ready Home

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5) May 11, 2015 Effective for Homes Revised May 11, 2015 Page 1 of 10 Permitted Starting 8/11/2015 To qualify as a DOE Zero Energy Ready Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes 1 . Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 2 Buildings eligible for qualification are: single family

  6. DOE Science Showcase - DOE's Smart Grid Research | OSTI, US Dept of Energy,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Scientific and Technical Information DOE's Smart Grid Research Image credit: DOE Office of Electricity Delivery & Energy Reliability A modernized electrical smart grid is needed to handle the exploding requirements of digital and computerized equipment and technology dependent on it as well as one that can automate and manage the increasing complexity and needs of electricity in the 21st Century. The Department of Energy (DOE) is working to increase the reliability, efficiency,

  7. DOE Announces Webinars on Solar Forecasting Metrics, the DOE Wind Vision,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and More | Department of Energy Solar Forecasting Metrics, the DOE Wind Vision, and More DOE Announces Webinars on Solar Forecasting Metrics, the DOE Wind Vision, and More February 12, 2014 - 7:38pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however, advanced registration is typically required. You can also watch archived webinars

  8. Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING

    Energy Savers [EERE]

    NNSA) FEDERAL EMPLOYEES | Department of Energy 40.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES The familiar level of this module is divided into two sections. In the first section, we will discuss the objective, requirements, and the responsibilities assigned to the heads of field elements. In the second section, we will discuss the content of attachment 1, Functional

  9. DOE Zero Energy Ready Home PV-Ready Checklist

    Broader source: Energy.gov [DOE]

    All homes certified as DOE Zero Energy Ready Homes must meet the mandatory requirements listed in Exhibit 1 of the National Program Requirements, including Requirement 7 Renewable Ready, which requires that homes meet the requirements listed in the PV-Ready Checklist. See the Checklist document for exceptions

  10. DOE-STD-1104-2014 Master Acronym List | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Master Acronym List DOE-STD-1104-2014 Master Acronym List February 4, 2015 DOE-STD-1104 Master Acronyms List. This document provides a Master Acronyms List of terms used in DOE-STD-1104. PDF icon DOE-STD-1104-2014 Master Acronym List More Documents & Publications DOE-STD-1104-2014 Training Requirements Crosswalk of DOE-STD-1104-2014 Master Acronym List for DOE-STD-3009-2014

  11. Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527

    SciTech Connect (OSTI)

    MacDonald, Jennifer C.

    2012-07-01

    DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)

  12. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  13. Communications Requirements of Smart Grid Technologies

    Broader source: Energy.gov [DOE]

    This report sets forth the findings of the U.S. Department of Energy (DOE) on the communications requirements of electric utilities and proposes specific recommendations for next steps to support...

  14. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  15. Public Affairs Policy and Planning Requirements for a Fuel Supply Disruption Emergency

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-06-08

    To establish responsibilities and requirements for Department of Energy (DOE) public affairs actions in the case of fuel supply disruption emergency. Cancels DOE 5500.5. Canceled by DOE O 151.1 of 9-25-95.

  16. Vintage DOE: Accomplishments

    Broader source: Energy.gov [DOE]

    This vintage video, from the Office of Scientific and Technical Information and the U.S. Department of Energy Office of Science, does a great job detailing DOE's accomplishments.

  17. DOE ISM CHAMPIONS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    903-5392 thomas.staker@hq.doe.gov ID Robert M. Stallman (208) 526-1995 ... 781-6328 james.protin@navy.mil NE Rich Stark (301) 903-4407 richard.stark@hq.doe.gov ...

  18. DOE F 5634

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMSEC Account Be Authorized to Use the Defense Courier Service DOE F 470.1 (092014) Replaces DOE F 470.1 (092012) All Other Editions are Obsolete U.S. Department of Energy ...

  19. NEW - DOE O 361.1C, Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program.

  20. DOE Sustainability SPOtlight

    Broader source: Energy.gov [DOE]

    Newsletter highlights the recipients of the U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) 2014 Sustainability Awards.