Sample records for doe project unique

  1. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  2. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  3. 2014 DOE Project Management Workshop

    Broader source: Energy.gov [DOE]

    What:  2014 DOE Project Management Workshop (Meeting the Challenge—Integrated Acquisition & Project Management)

  4. DOE Robotics Project

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  5. Active DOE Completed Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Review Date P1137-2007REV Fire ProtecƟon Engineering FAQS DOE-STD-1137-2014 Karen Boardman (NNSA) P1181-2004REV Facility Maintenance Management DOE-STD-1181-2014 Karen Boardman FuncƟon Area QualiĮcaƟon Standard (HS-70) P1182-2004REV Civil Structural Engineering, FuncƟonal DOE-STD-1182-2014 Karen Boardman Area QualiĮcaƟon Standard (AU-70) P2013-03 ProtecƟve Force ConƟngency Planning DOE-HDBK-1213-2014

  6. 2016 DOE Project Management Workshop - "Enhancing Project Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 DOE Project Management Workshop - "Enhancing Project Management" 2016 DOE Project Management Workshop - "Enhancing Project Management" 20160407-doe-project-management-workshop-AD...

  7. Unique environmental remediation project on steep canyon successfully

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    completed Environmental remediation project on canyon completed Unique environmental remediation project on steep canyon successfully completed A team recently completed a remediation project that involved removing contaminated rock and soil from the parking lot of a busy shopping center. July 29, 2015 A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. A telescoping crane hoists a spider

  8. DOE Recovery Act Field Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Field Projects DOE Recovery Act Field Projects DOE Recovery Act Field Projects

  9. 2016 DOE Project Management Workshop | Department of Energy

    Office of Environmental Management (EM)

    6 DOE Project Management Workshop 2016 DOE Project Management Workshop 2016 DOE Project Management Workshop Completed The 2016 Project Management Workshop was held on March 22-23, ...

  10. DOE Grand Junction Projects Office Edgemont LTSP

    Office of Legacy Management (LM)

    DOE Grand Junction Projects Office Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ......

  11. DOE Preparing for Sale of Unique RMOTC Property and Equipment in Wyoming |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Preparing for Sale of Unique RMOTC Property and Equipment in Wyoming DOE Preparing for Sale of Unique RMOTC Property and Equipment in Wyoming October 24, 2013 - 8:59am Addthis DOE Preparing for Sale of Unique RMOTC Property and Equipment in Wyoming Did you know? RMOTC's mission is to ensure America's energy security and prosperity by assisting its partners in developing and commercializing energy efficient and environmentally friendly technologies to address critical

  12. Integrated Projects - Non-DOE Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Validation » Integrated Projects » Integrated Projects - Non-DOE Projects Integrated Projects - Non-DOE Projects In addition to the integrated technology validation projects sponsored by DOE, universities, along with state and local government entities throughout the world are partnering with industry to demonstrate integrated hydrogen and fuel cell technologies in real-world applications. GM/DOW Chemical Partnership The first General Motors fuel cell trailer is in place at the Dow

  13. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    receives DOE Secretary's Award for Project Management Improvement Monday, April 13, 2015 - 3:28pm The NNSA Nuclear Materials Safeguards and Security Upgrade Project (NMSSUP) ...

  14. Major DOE Biofuels Project Locations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Biomass Program Major DOE Biofuels Project Locations in the United States Major DOE Biofuels Project Locations (63.81 KB) More Documents & Publications Major DOE Biofuels Project ...

  15. 2015 DOE Acquisition and Project Management (APM) Workshop |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 DOE Acquisition and Project Management (APM) Workshop 2015 DOE Acquisition and Project Management (APM) Workshop Workshop Details: What: 2015 DOE Acquisition and Project...

  16. Property:Does This Project Have DOE Funding? | Open Energy Information

    Open Energy Info (EERE)

    Property Edit with form History Property:Does This Project Have DOE Funding? Jump to: navigation, search Property Name Does This Project Have DOE Funding? Property Type String...

  17. 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Plenary I: ...

  18. DOE Technology Validation Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stationary/Distributed Generation Projects » DOE Technology Validation Projects DOE Technology Validation Projects Stationary fuel cells can be used for backup power, power for remote locations, stand-alone power plants for towns and cities, distributed generation for buildings, and co-generation of heat and power. The Fuel Cell Technologies Office has a number of demonstrations underway to develop and evaluate the performance of fuel cells for stationary applications. The status of DOE's

  19. 2016 DOE Project Management Workshop – Agenda

    Broader source: Energy.gov [DOE]

    Agenda for Day 1 (Tuesday, March 22) and Day 2 (Wednesday, March 23, 2016) of the 2016 DOE Project Management Workshop.

  20. 2016 DOE Project Management Workshop - Transportation | Department...

    Office of Environmental Management (EM)

    Transportation 2016 DOE Project Management Workshop - Transportation Complimentary guest shuttle service provided by Sheraton Pentagon City Hotel. PDF icon Shuttle service Key ...

  1. 2016 DOE Project Management Workshop - Biographies | Department...

    Office of Environmental Management (EM)

    Biographies 2016 DOE Project Management Workshop - Biographies Biographies for this year's workshop are not yet available. Please check back later. PDF icon Biographies Key ...

  2. 2016 DOE Project Management Workshop - Presentations | Department...

    Energy Savers [EERE]

    Presentations 2016 DOE Project Management Workshop - Presentations The presentations for this year's workshop are not yet available. Please check back later. PDF icon Presentations ...

  3. Active DOE Technical Standards Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... James O'Brien (AU-31) James O'Brien (AU-32) Carl Sykes (202) 586-7669 carl.sykes@hq.doe.gov Garrett A. Smith garrett.smith@hq.doe.gov Pranab K. Guha (301) 903-7089 ...

  4. 2014 DOE Biomass Program Integrated Biorefinery Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review DOE Award No. DE-FC36-07GO17028 April 16, 2014 Principal Investigator - Gerson Santos-Leon Project Director - Joseph Bradford Abengoa Bioenergy Biomass of Kansas, LLC The following contains proprietary and confidential information that may not be released to persons outside the US Department of Energy 2 2 2014 ABBK Comprehensive Project Review Table of Contents Abengoa Bioenergy Background General Overview 1 Company

  5. DOE Project Management Update (Metrics)

    Broader source: Energy.gov [DOE]

    Michael Peek, Deputy Director, Office of Project Management Oversight and Assessments March 22, 2016

  6. DOE Completes Five Recovery Act Projects

    Broader source: Energy.gov [DOE]

    DOE's EM program recently completed five projects at the Oak Ridge site funded through the Recovery Act. The projects included the expansion of two landfills at the Oak Ridge Reservation (ORR) and pre-demolition and demolition projects at ETTP and Y-12.

  7. Active DOE Techncial Standards Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jasim-Hanif Iniated - In Development 2012REV Design Criteria for DOE Facilies (AU-32) 08182015 P1026- NNSA Packaging Cercaon Engineer P1026-2009REV Ahmad Al-Daouk ...

  8. DOE awards contract for sludge buildout project

    Broader source: Energy.gov [DOE]

    DOE's Oak Ridge Office of Environmental Management has awarded a contract to CH2M Hill Constructors, Inc. for the Sludge Processing Facility Buildouts Project at the Transuranic Waste Processing Center.

  9. 2013 DOE BETO Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE BETO Project Peer Review NREL Sustainability Analysis: Life Cycle Inventory of Air Emissions Date: May 22, 2013 Technology Area: Sustainability PIs: Daniel Inman and Garvin Heath Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 NREL Sustainability Analysis Goals This project provides analysis to assess the sustainability of renewable fuels in terms of greenhouse gas emissions,

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Second Generation Biofuels: Carbon Sequestration and Life Cycle Analysis Date: May 21, 2013, 11:20 AM Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Adam J. Liska Co-PIs: T. Arkebauer and K. Cassman Organization: University of Nebraska, Lincoln, NE This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Goals * Determine the impact of corn

  11. Stationary/Distributed Generation Projects- Non-DOE Projects

    Broader source: Energy.gov [DOE]

    In addition to the stationary/distributed generation technology validation projects sponsored by DOE, universities, along with state and local government entities across the U.S., are partnering...

  12. DOE Tribal Clean Energy Project Descriptions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Award Project Location Project Focus Feasibility Study Tlingit Haida Regional Housing Authority (THRHA) $898,772 Juneau, AK The project will provide energy assessments, alternative energy monitoring, and energy conservation upgrades for low-income, multi-family residences in 14 southeast Alaska communities with extremely high energy costs. THRHA will also provide home energy assessments, energy conservation education, and energy use monitoring for 400 families. Confederated Salish and

  13. DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program New Fuel Cell Projects Kickoff Meeting DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting Presentation by DOE's Patrick Davis at a meeting on new fuel cell ...

  14. 2015 DOE Acquisition and Project Management Workshop Agenda ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Acquisition and Project Management Workshop Agenda 2015 DOE Acquisition and Project Management Workshop Agenda This year's theme is "Federal Stewardship-- Providing the Value...

  15. 2014 DOE Project Management Workshop Attendees List | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Project Management Workshop Attendees List 2014 DOE Project Management Workshop Attendees List PDF icon 2014 PM Workshop Attendees ListName & Office.pdf More Documents &...

  16. 2014 DOE Project Management Workshop Presentations: PARS II Enhancemen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, ...

  17. PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM PDF icon SBIRPhaseIII.pdf More Documents...

  18. DOE Awards Contract for the West Valley Demonstration Project...

    Office of Environmental Management (EM)

    the West Valley Demonstration Project Probabilistic Performance Assessment DOE Awards Contract for the West Valley Demonstration Project Probabilistic Performance Assessment ...

  19. 2013 DOE BETO Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 DOE BETO Project Peer Review Biomass Pyrolysis to Hydrocarbon Fuels in the Petroleum Refining Context Brazil Bilateral: Petrobras - NREL RD&D CRADA WBS: 6.5.1.1 May 21, 2013 Bio-Oil Technology Area Review Helena L. Chum National Renewable Energy Laboratory Andrea Pinho, Petrobras/CENPES This presentation does not contain any proprietary, confidential, or otherwise restricted information NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and

  20. sbir-projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SBIR Projects The Small Business Innovation Research Program (SBIR) is a competitive program that encourages small domestic businesses to engage in Federally-funded R&D that has the potential for commercialization. Each year the Department of Energy (DOE) issues Funding Opportunity Announcements (FOA) inviting small businesses to apply for SBIR grants. More information on DOE/NETL SBIR opportunities may be found at: http://www.sbir.gov/about/about-sbir. The SOFC Program presently has five

  1. DOE Financial Assistance Awards: Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Source: US DOE 7/1/2013 eere.energy.gov DOE Financial Assistance Awards: Active Project Management Jim Alkire Wednesday, May 15, 2013 2 | Source: US DOE 7/1/2013 eere.energy.gov Recent Opportunities EERE Program Posted Date NOI or Solicitation/ FOA # NOI/Solicitation/FOA Title Anticipated Funding Closing Date Vehicle Technologies 12/3/2012 DE-FOA- 0000722 Electrochemical Storage Technologies Suitable for Automobile Industry Applications $62.5M 1/31/2013 Vehicle Technologies 2/1/2013 DE-FOA-

  2. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations

    Broader source: Energy.gov [DOE]

    This page contains the presentations presented at the 2015 DOE Acquisition and Project Management (APM) Workshop.

  3. Healy Clean Coal Project: A DOE Assessment

    SciTech Connect (OSTI)

    National Energy Technology Laboratory

    2003-09-01

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict

  4. 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Review | Department of Energy 4 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Plenary I: Progress in Advanced Biofuels 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Gerson Santos-Leon, Executive Vice President, Abengoa santos-leon_biomass_2014.pdf (4.68 MB) More Documents & Publications Abengoa IBR Successes Applicant

  5. Recommendation 179: DOE Quarterly Project Reviews | Department of Energy

    Office of Environmental Management (EM)

    9: DOE Quarterly Project Reviews Recommendation 179: DOE Quarterly Project Reviews ORSSAB Recommendation to DOE on Providing Information in the DOE Quarterly Project Reviews. Recommendation 179 (107.34 KB) DOE response to recommendation 179 (293.68 KB) More Documents & Publications Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 164: Recommendation on Engineering and Technology Development on the Oak Ridge Reservation Recommendation 163:

  6. 2011 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop 2011 DOE Project Management Workshop Workshop Speakers and Presentations Paul Bosco, The New DOE O 413.3B Jeff Baker, EERE's Research Support Facility Patrick...

  7. Information Technology Project Execution Model Guide - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CURRENT DOE G 415.1-1, Information Technology Project Execution Model Guide by Denise Hill Functional areas: Information Technology, Project Management The guide was developed in...

  8. DOE EM Project Experience & Lessons Learned for In Situ Decommissionin...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of ...

  9. DOE Issues RFP for West Valley Demonstration Project Probabilistic...

    Energy Savers [EERE]

    RFP for West Valley Demonstration Project Probabilistic Performance Assessment DOE Issues RFP for West Valley Demonstration Project Probabilistic Performance Assessment April 2, ...

  10. DOE Funds 21 Research, Development and Demonstration Projects...

    Energy Savers [EERE]

    Funds 21 Research, Development and Demonstration Projects for up to 78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects ...

  11. Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ITR Landfill Assessment Project Lessons Learned Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned By: Craig H. Benson, PhD, PE Where: EM SSAB Teleconference: 1 ...

  12. DOE to Host Three Alaska Native Village Renewable Energy Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Three Alaska Native Village Renewable Energy Project Development Workshops in March DOE to ... projects with the potential to produce jobs, spur economic development, and ideally ...

  13. High Level Overview of DOE Biomass Logistics II Project Activities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Level Overview of DOE Biomass Logistics II Project Activities High Level Overview of DOE Biomass Logistics II Project Activities Breakout Session 1B-Integration of Supply Chains I: ...

  14. PNNL Fungal Biotechnology Core DOE-OBP Project (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: PNNL Fungal Biotechnology Core DOE-OBP Project Citation Details In-Document Search Title: PNNL Fungal Biotechnology Core DOE-OBP Project In 2009, we continued to ...

  15. PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3 PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3 PDF icon sbirphase3pg3.pdf...

  16. Major DOE Biofuels Project Locations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    47.09 KB) More Documents & Publications Major DOE Biofuels Project Locations Slide 1 Algal Biofuel Technologies

  17. DOE Integrated Technology Validation Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Projects » DOE Integrated Technology Validation Projects DOE Integrated Technology Validation Projects Integrated hydrogen and fuel cell systems will maximize overall system efficiencies, reduce costs, and optimize component development. DOE's Fuel Cell Technologies Office has a number of demonstrations underway to develop, evaluate, and validate the performance of integrated systems such as Power Parks. The status of DOE's integrated technology validation projects is detailed in the

  18. DOE Office of Environmental Management Project and Contract Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. DOE Office of Environmental Management Contract and Project Management

  19. DOE Under Secretary Recognizes Residents who Helped Plan Manhattan Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Park | Department of Energy DOE Under Secretary Recognizes Residents who Helped Plan Manhattan Project Park DOE Under Secretary Recognizes Residents who Helped Plan Manhattan Project Park October 5, 2015 - 12:05pm Addthis DOE Deputy Under Secretary for Management and Performance David Klaus discussed the Manhattan Project National Historical Park during the National Cleanup Workshop. DOE Deputy Under Secretary for Management and Performance David Klaus discussed the Manhattan Project

  20. 2014 DOE Project Management Workshop Presentations: PARS II Enhancements -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Igor Pedan, MA-63 | Department of Energy 2014 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop presentation by Igor Pedan. Presentation (1.32 MB) Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications 2014 DOE Project Management Workshop Presentations: PARS II

  1. PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM SBIR_Phase_III.pdf (228.04 KB) More Documents & Publications SBIR_Phase_III.pdf PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3 Albany HTS Power Cable

  2. DOE Bioenergy Technologies Office: Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Techno-economic analysis (TEA) - Feedback to the research efforts Specific objective in 2012: Provide TEA and validate DOE BETO's goal to demonstrate technologies capable of producing cost competitive ethanol from biomass by the year 2012. 2 Quad Chart Overview 3 Start Date Oct 1, 2006 End Date Sept 30, 2012 % Complete 100% Timeline for Mixed Alcohols Year Total [Gasification/Pyrolysis] FY12 $860k [$700k/$160k] FY13 $1,000k [$250k/$750k] FY14 $1,050k [$350k/$700k] projected Years 10 (FY04 to

  3. DOE IDIQ Energy Savings Performance Contract Awarded Projects | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy DOE IDIQ Energy Savings Performance Contract Awarded Projects DOE IDIQ Energy Savings Performance Contract Awarded Projects Excel spreadsheet summarizes the U.S. Department of Energy's (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contract (ESPC) awarded projects. Data is reported at the time of project award. Selected project modification data is included. This data is subject to review by the Federal Energy Management Program and may be modified

  4. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Institute | Department of Energy Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE

  5. Geologic Carbon Dioxide Storage Field Projects Supported by DOE's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sequestration Program | Department of Energy Geologic Carbon Dioxide Storage Field Projects Supported by DOE's Sequestration Program Geologic Carbon Dioxide Storage Field Projects Supported by DOE's Sequestration Program Background: The U.S. DOE's Sequestration Program began with a small appropriation of $1M in 1997 and has grown to be the largest most comprehensive CCS R&D program in the world. The U.S. DOE's sequestration program has supported a number of projects implementing CO2

  6. 2011 DOE Funded Offshore Wind Project Updates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 DOE Funded Offshore Wind Project Updates 2011 DOE Funded Offshore Wind Project Updates September 12, 2014 - 10:52am Addthis For the past few years, much of the U.S. Department of Energy's (DOE's) Wind Program research and development efforts have been focused on accelerating the development and deployment of offshore wind energy technology. In 2011, DOE awarded $43 million to 41 projects across 20 states to speed technical innovations, lower costs, and shorten the timeline for deploying

  7. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    SciTech Connect (OSTI)

    Zhu, Jianting

    2010-03-11

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity and four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  8. DOE High Performance Concentrator PV Project

    SciTech Connect (OSTI)

    McConnell, R.; Symko-Davies, M.

    2005-08-01

    Much in demand are next-generation photovoltaic (PV) technologies that can be used economically to make a large-scale impact on world electricity production. The U.S. Department of Energy (DOE) initiated the High-Performance Photovoltaic (HiPerf PV) Project to substantially increase the viability of PV for cost-competitive applications so that PV can contribute significantly to both our energy supply and environment. To accomplish such results, the National Center for Photovoltaics (NCPV) directs in-house and subcontracted research in high-performance polycrystalline thin-film and multijunction concentrator devices with the goal of enabling progress of high-efficiency technologies toward commercial-prototype products. We will describe the details of the subcontractor and in-house progress in exploring and accelerating pathways of III-V multijunction concentrator solar cells and systems toward their long-term goals. By 2020, we anticipate that this project will have demonstrated 33% system efficiency and a system price of $1.00/Wp for concentrator PV systems using III-V multijunction solar cells with efficiencies over 41%.

  9. DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project...

    Office of Environmental Management (EM)

    DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting On February 8-9, 2005, the Department of Energy held the DOE Hydrogen Delivery High-Pressure Tanks and ...

  10. Two energy technology projects from Los Alamos gain DOE funding

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy technology projects gain DOE funding Two energy technology projects from Los Alamos gain DOE funding Funding to help businesses move promising energy technologies from DOE's National Laboratories to the marketplace. June 21, 2016 This first department-wide round of funding through the Technology Commercialization Fund (TCF) will support 54 projects at 12 national labs involving 52 private-sector partners. This first department-wide round of funding through the Technology Commercialization

  11. DOE Financial Assistance Awards: Active Project Management | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Financial Assistance Awards: Active Project Management DOE Financial Assistance Awards: Active Project Management Presentation by Jim Alkire during the May 15 working lunch session at the 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting. DOE Financial Assistance Awards: Active Project Management (566.87 KB) More Documents & Publications Funding Opportunity Webinar - Advancing Solutions to Improve Energy

  12. DOE-Backed Project Will Demonstrate Innovative Geothermal Technology |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE-Backed Project Will Demonstrate Innovative Geothermal Technology DOE-Backed Project Will Demonstrate Innovative Geothermal Technology June 16, 2010 - 2:27pm Addthis As part of DOE's Geothermal Technologies Program, two geothermal companies, AltaRock Energy and Davenport Newberry, announced plans on June 8 to conduct a demonstration of Enhanced Geothermal Systems (EGS) technology at a site located near Bend, Oregon. The purpose of this project is to extract energy

  13. DOE Recovery Field Projects and State Memos | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    DOE Recovery Field Projects and State Memos Click on a state to download the recovery memo for that state. View All Maps Addthis...

  14. Major DOE Biofuels Project Locations | Department of Energy

    Office of Environmental Management (EM)

    31.1 KB) More Documents & Publications Major DOE Biofuels Project Locations Slide 1 The Current State of Technology for Cellulosic Ethanol

  15. DOE/NSF Thermoelectric Partnership Project SEEBECK Saving Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    research and sharing Knowledge DOENSF Thermoelectric Partnership Project SEEBECK Saving Energy Effectively By Engaging in Collaborative research and sharing Knowledge 2011 DOE ...

  16. DOE/NSF Thermoelectric Partnership Project SEEBECK Saving Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Sharing Knowledge DOENSF Thermoelectric Partnership Project SEEBECK Saving Energy Effectively By Engaging in Collaborative Research and Sharing Knowledge 2012 DOE ...

  17. DOE Announces Clean Energy Projects for Low-Carbon Communities...

    Office of Environmental Management (EM)

    Clean Energy Projects for Low-Carbon Communities of the Americas Initiative DOE Announces Clean ... of the Americas (LCCA) - a program launched in June 2009 to assist ...

  18. 2016 DOE Project Management Workshop - Area Restaurants | Department...

    Office of Environmental Management (EM)

    Area Restaurants 2016 DOE Project Management Workshop - Area Restaurants Information on surrounding area restaurants PDF icon Area restaurants Key Resources PMCDP EVMS PARS IIe FPD ...

  19. DOE Selects 16 Transformational Carbon Capture Technologies Projects...

    Office of Environmental Management (EM)

    ... The project will yield a conceptual design for an algae-based CO2 capture system suitable for integration with a coal-fired power plant. The project will last 24 months. Cost: DOE: ...

  20. DOE Announces $60 Million in Projects to Accelerate Scientific Discovery

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    through Advanced Computing | Department of Energy 0 Million in Projects to Accelerate Scientific Discovery through Advanced Computing DOE Announces $60 Million in Projects to Accelerate Scientific Discovery through Advanced Computing September 7, 2006 - 8:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science today announced approximately $60 million in new awards annually for 30 computational science projects over the next three to five years. The projects

  1. Information Technology Project Management - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE G 200.1-1 App A, Appendix A Glossary on Dec 03, 2012 DOE G 200.1-1 Ch 4, Requirements Definition Stage on Dec 03, 2012 DOE G 200.1-1 App B, List of Abbreviations on Dec 03,...

  2. Information Technology Project Management - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5.1 Admin Chg 1, Information Technology Project Management by Denise Hill Functional areas: Administrative Change, Information Technology, Project Management, The Order provides...

  3. DOE Program Offers Participants Unique Opportunity to Gain Carbon Capture and Storage Knowledge

    Broader source: Energy.gov [DOE]

    Future leaders and innovators in the area of carbon capture and storage can gain a unique and intensive tutorial on the subject by participating in the U.S. Department of Energy’s Research Experience in Carbon Sequestration program.

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tuesday, May 21 st , 2013 Technology Area Review: Biochemical Conversion Principal Investigator: David K. Johnson Organization: National Renewable Energy Laboratory 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Pretreatment and Enzyme Hydrolysis This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Project Overview *2 Develop and apply fundamental knowledge of pretreatment and enzymatic hydrolysis concepts in process-relevant

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Engineering Zymomonas mobilis for Hydrocarbon Fuels Production Date: May 22, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Min Zhang Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement * Project objectives - Develop biological catalysts for production of fuel molecules and/or

  6. DRAFT 2012 DOE Project Management Workshop Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT 2012 DOE Project Management Workshop Agenda DRAFT 2012 DOE Project Management Workshop Agenda 2012 Workshop Agenda_Ver_25 (For Distribution).pdf (38.46 KB) More Documents & Publications 2011 Workshop Agenda_Ver_19.xlsx 2011_Workshop_Agenda_Ver_16(1).pdf 2011 Workshop Agenda_Ver_21.xlsx

  7. DOE, Washington Closure complete recycling project at Hanford | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy DOE, Washington Closure complete recycling project at Hanford DOE, Washington Closure complete recycling project at Hanford October 28, 2014 - 4:00pm Addthis Media Contacts Cameron Hardy, DOE, 509-376-5365, Cameron.Hardy@rl.doe.gov Peter Bengtson, Washington Closure Hanford, 509-372-9031, Peter.Bengtson@wch-rcc.com About $400,000 saved by recycling electrical substation components in 300 Area RICHLAND, Wash. - The U.S. Department of Energy (DOE) recently teamed with contractor

  8. Ten Projects Awarded NERSC Allocations under DOE's ALCC Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ten Projects Awarded NERSC Allocations under DOE's ALCC Program Ten Projects Awarded NERSC Allocations under DOE's ALCC Program June 24, 2014 43251113992ff3baa1edb NERSC Computer Room. Photo by Roy Kaltschmidt, LBNL Under the Department of Energy's (DOE) ASCR Leadership Computing Challenge (ALCC) program, 10 research teams at national laboratories and universities have been awarded 382.5 million hours of computing time at the National Energy Research Scientific Computing Center (NERSC). The

  9. The Path to Transforming Knowledge into Energy Projects: DOE Tribal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Webinar Series 2015 | Department of Energy The Path to Transforming Knowledge into Energy Projects: DOE Tribal Renewable Energy Webinar Series 2015 The Path to Transforming Knowledge into Energy Projects: DOE Tribal Renewable Energy Webinar Series 2015 Learn more about the 2015 Tribal Renewable Energy Webinar Series and read detailed descriptions about each of the monthly webinars in the flier below. DOE Tribal Renewable Energy Webinar Series 2015 Flier (613.37 KB) More

  10. 2015 DOE Acquisition and Project Management Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stephen Meador, Director, Office of Project Assessments, Science 10:30 - 11:30 Bill Hamel, Federal Project Director for WTP 11:30 - 1:00 HotelLocal Area 1:00 - 2:00 Scott ...

  11. project_sums | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Index of Research Project Summaries Current Oil & Gas Research Projects Unconventional Resources Enhanced Oil Recovery Deepwater Technology Methane Hydrates Completed Projects Completed Natural Gas and Unconventional Resources Completed Enhanced Oil Recovery Completed Deepwater Technology Completed Methane Hydrates Completed E&P Technologies Exploration Technologies Reservoir Characterization Advanced Drilling Deep Formations Improved Recovery Tech Transfer Natural Gas Processing Low

  12. DOE Announces $2 Million Funding for Methane Hydrates Projects | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 2 Million Funding for Methane Hydrates Projects DOE Announces $2 Million Funding for Methane Hydrates Projects November 7, 2005 - 12:43pm Addthis Seeks to Unlock World's Biggest Potential Source of "Ice That Burns" WASHINGTON, DC - The Department of Energy (DOE) today announced a total of $2 million in funding to five research projects that will assess the energy potential, safety, and environmental aspects of methane hydrate exploration and development. Termed the

  13. DOE Selects Gasification Technology Research Projects for Funding |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Gasification Technology Research Projects for Funding DOE Selects Gasification Technology Research Projects for Funding July 14, 2015 - 11:15am Addthis The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected seven projects to receive funding through NETL's Gasification System Program. This program supports a wide range of research and development activities aimed at improving fuel and product versatility, efficiency, and economics of

  14. DOE Selects Six University Coal Research Projects for Funding | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Six University Coal Research Projects for Funding DOE Selects Six University Coal Research Projects for Funding August 17, 2015 - 2:31pm Addthis The U.S Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected six projects to receive funding through NETL's University Coal Research Program, administered by the Crosscutting Research Technology Program. The University Coal Research Program funds research and development at U.S. colleges and universities

  15. DOE Selects 16 Transformational Carbon Capture Technologies Projects for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Funding | Department of Energy 16 Transformational Carbon Capture Technologies Projects for Funding DOE Selects 16 Transformational Carbon Capture Technologies Projects for Funding August 13, 2015 - 9:59am Addthis The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected 16 projects to receive funding through NETL's Carbon Capture Program. The program funds development and testing of transformational carbon dioxide (CO2) capture systems for new and existing

  16. DOE Announces 12 Projects To Increase Vehicle Efficiency | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 12 Projects To Increase Vehicle Efficiency DOE Announces 12 Projects To Increase Vehicle Efficiency February 16, 2005 - 10:16am Addthis Industry Partners to Cost-Share Funding on $175 Million in Research Projects WASHINGTON, DC -- Secretary of Energy Samuel Bodman today announced the selection of projects that will increase the energy efficiency of passenger and commercial vehicles while maintaining low emissions. Twelve projects, with a total value of $175 million (50 percent, or

  17. project information | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Biomass Feed and Gasification Archived Projects Agreement Number Project Title Performer Name Technology Area FE0023577 Advanced Gasifier and Water Gas Shift Technologies for Low Cost Coal Conversion to High Hydrogen Syngas Aerojet Rocketdyne Coal & Coal-Biomass to Liquids, Gasification Systems Recently Completed FE0005339 Development of Kinetics and Mathematical Models for High Pressure Gasification of Lignite-Switchgrass Blends Georgia Tech Research Corporation Coal

  18. 2014 DOE Project Management Workshop Presentations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1. PM Update - Paul Bosco, Director, Office of Acquisition & Project Management 2. Ethics - Marianne Jennings, W.P. Carey School of Business at Arizona State University 3. ...

  19. DOE Announces Competitive Improvement Project Awards | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Competitiveness Improvement Project (CIP), which was announced in January 2013. Bergey Windpower Company of Oklahoma, an initial CIP recipient, used this funding to identify ...

  20. major-projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major Gasification Projects The Gasification Systems Program sponsors R&D for technology at certain levels of technological maturity. These vary from new technological concepts...

  1. Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM celebrated a milestone recently when DOE issued the long-awaited Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste.

  2. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  3. DOE Project Number Project Name Site Critical Decision Total...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (UVS) Carlsbad CD0 309,000,000 010121 CBC-ETEC-0040.C1 Energy Technology Engineering ... CBC-LBNL-0040.C1 Old Town Demolition Project, Phase 1 Project Lawrence Berkeley National ...

  4. DOE Projects to Advance Environmental Science and Technology | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Projects to Advance Environmental Science and Technology DOE Projects to Advance Environmental Science and Technology August 19, 2009 - 1:00pm Addthis Washington, DC - The Office of Fossil Energy's National Energy Technology Laboratory (NETL) has selected nine new projects targeting environmental tools and technology for shale gas and coalbed methane (CBM) production. NETL's goals for these projects are to improve management of water resources, water usage, and water disposal, and

  5. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    SciTech Connect (OSTI)

    Kostova, M.; Howard, D.; Elder, P.

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  6. SASSI Subtraction Method Effects at Various DOE projects

    Broader source: Energy.gov [DOE]

    SASSI Subtraction Method Effects at Various DOE projects U.S. Department of Energy Natural Phenomena Hazards Workshop October 25-26, 2011 Greg E. Mertz, Michael C. Costantino, Thomas W. Houston, Andrew S. Maham

  7. High Level Overview of DOE Biomass Logistics II Project Activities

    Broader source: Energy.gov [DOE]

    Breakout Session 1B—Integration of Supply Chains I: Breaking Down Barriers High Level Overview of DOE Biomass Logistics II Project Activities Kevin Comer, Associate Principal, Antares Group Inc.

  8. DOE, Treasury Provide Guidance on Direct Payments for Renewable Projects

    Broader source: Energy.gov [DOE]

    DOE and the U.S. Department of Treasury issued guidance on July 9 on the process for renewable energy project owners to receive direct federal payments in lieu of tax credits.

  9. DOE Moab Project Reaches Halfway Mark in Mill Tailings Removal...

    Office of Environmental Management (EM)

    The U.S. Department of Energy (DOE) has reached 8 million tons of uranium mill tailings removed from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project. ...

  10. DOE Selects Contractor for Depleted Hexafluoride Conversion Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support March 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati ...

  11. DOE Expands, Simplifies Loan Guarantees for Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    DOE announced October 7 that it will provide guarantees for up to $8 billion in loans for conventional renewable energy generation projects such as wind, solar, biomass, and geothermal power, as well as hydropower.

  12. Project Development | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    ... Science, Office of Project Assessment (OPA) web site for several summary documents describing the DOE O 413.3B requirements and as they are implemented by the Office of Science). ...

  13. USDA and DOE Fund Genomics Projects For Bioenergy Fuels Research |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Genomics Projects For Bioenergy Fuels Research USDA and DOE Fund Genomics Projects For Bioenergy Fuels Research August 9, 2006 - 8:43am Addthis WASHINGTON, DC - Aug. 9, 2006 - Energy Secretary Samuel Bodman and Agriculture Secretary Mike Johanns today announced that the Department of Agriculture and the Department of Energy (DOE) have jointly awarded nine grants totaling $5.7 million for biobased fuels research that will accelerate the development of alternative fuel

  14. DOE Project Taps HPC for Next-Generation Climate Modeling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Project Taps HPC for Next-Generation Climate Modeling DOE Project Taps HPC for Next-Generation Climate Modeling Berkeley Lab, NERSC to help accelerate development of state-of-the-science Earth system models August 25, 2014 Contact: Dan Krotz 510-486-4019 billcollins.jpg Bill Collins, ACME's Chief Scientist and head of the Earth Sciences Division's Climate Sciences Department at Berkeley Lab. Image: Roy Kaltschmidt High performance computing (HPC) will be used to develop and apply the most

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 DOE Bioenergy Technologies Office (BETO) Project Peer Review Mild Biomass Liquefaction Process for Economic production of Stabilized Refinery- Ready Bio-Oils May 20-24, 2013 Bio-Oil Technology Area Review Santosh Gangwal, Kevin McCabe, Andrew Campos and Demps Pettway Southern Research Institute This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement Project Goal * Demonstrate a mild thermochemical liquefaction process to

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation name 1 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Butanol from Woody Biomass 2.3.2.11 * Date: May 21, 2013 * Technology Area Review: Biochemical Conversion * Principal Investigator: Jonathan R Mielenz * Organization: Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Presentation name Goal Statement This seed project aims to evaluate the fermentation of woody biomass to butanol

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Biochemical Processing Integration May 20, 2013 Biochemical Conversion Area Daniel Schell NREL This presentation does not contain any proprietary, confidential or otherwise restricted information 2 High-Level Project Goal Supports the mission of BETO and the Biochemical Conversion Technology Area to independently demonstrate integrated process performance and transfer this knowledge to industry, further facilitating BETO's mission

  18. DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feedstock Supply Chain Analysis WBS #:1.1.1.2 March 25, 2015 Jake Jacobson Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Feedstocks Platform DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2 | Bioenergy Technologies Office Goal Statement Connecting the Nation's Diverse Biomass Resources to the Bioenergy Industry The primary purpose of this project is to provide technical analysis support to the

  19. DOE Selects Projects to Assess Offshore Carbon Storage | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Assess Offshore Carbon Storage DOE Selects Projects to Assess Offshore Carbon Storage July 15, 2015 - 10:30am Addthis The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected four projects to receive funding through NETL's Carbon Storage program. The program is working to develop and advance the effectiveness of onshore and offshore carbon storage technologies, reduce the challenges associated with implementation, and prepare them for widespread

  20. DOE Announces New Projects to Modernize America's Electric Grid |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buildings | NREL DOE Announces New Projects to Modernize America's Electric Grid NREL to co-lead DOE's multi-lab Grid Modernization Laboratory Consortium January 14, 2016 Today, U.S. Department of Energy Secretary Ernest Moniz announced up to $220 million in new funding for a consortium of DOE national laboratories and partners to support critical research and development over the next three years to help modernize our nation's electrical power grid. The secretary also announced the release

  1. DOE Announces New Projects to Modernize America's Electric Grid | Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems Integration | NREL DOE Announces New Projects to Modernize America's Electric Grid NREL to co-lead DOE's multi-lab Grid Modernization Laboratory Consortium January 14, 2016 Today, U.S. Department of Energy Secretary Ernest Moniz announced up to $220 million in new funding for a consortium of DOE national laboratories and partners to support critical research and development over the next three years to help modernize our nation's electrical power grid. The secretary also announced

  2. DOE Announces New Projects to Modernize America's Electric Grid | Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modernization | NREL DOE Announces New Projects to Modernize America's Electric Grid NREL to co-lead DOE's multi-lab Grid Modernization Laboratory Consortium January 14, 2016 Today, U.S. Department of Energy Secretary Ernest Moniz announced up to $220 million in new funding for a consortium of DOE national laboratories and partners to support critical research and development over the next three years to help modernize our nation's electrical power grid. The secretary also announced the

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Steven W. Peretti, peretti@ncsu.edu Presenter: Sunkyu Park, sunkyu_park@ncsu.edu Organization: North Carolina State University 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information * Biomass Pretreatment and Reactivity of the Resulting Sugars - How does residual lignin effect enzymatic hydrolysis? - How

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Genomatica Sustainable Chemicals Genomatica Sustainable Chemicals Development of an Integrated Biofuel and Chemical Refinery John D. Trawick Research Fellow, Genomatica 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Date: 21 May 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Mark Burk Organization: Genomatica This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Demonstrate the

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (BETO) Project Peer Review Collaborative: Algae-based biofuels integrated assessment framework development, evaluation, and demonstration (PNNL) MAY 23, 2013 TECHNOLOGY AREA REVIEW: ALGAE PRINCIPAL INVESTIGATOR: RICHARD SKAGGS PACIFIC NORTHWEST NATIONAL LABORATORY This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Goal: This collaborative project couples PNNL's Biomass Assessment Tool (BAT) with the Algae Logistics Model (ALM)

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    proprietary, confidential, or otherwise restricted information. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review International Sustainability and Standards (ISO) and Brazil collaborations May 23, 2013 Technology Area: Analysis & Sustainability Principal Investigator: Keith L. Kline Oak Ridge National Laboratory 2 Managed by UT-Battelle for the Department of Energy Project * Build international consensus around criteria, definitions and measurement methods required to assess

  7. Milliken Clean Coal Demonstration Project: A DOE Assessment

    SciTech Connect (OSTI)

    National Energy Technology Laboratory

    2001-08-15

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

  8. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    SciTech Connect (OSTI)

    Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  9. Technical Risk Rating of DOE Environmental Projects - 9153

    SciTech Connect (OSTI)

    Cercy, Michael; Fayfich, Ronald; Schneider, Steven

    2009-02-11

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Peer Review Pilot-Scale Demonstration of a Fully Integrated Process for Converting Woody Biomass into Clean Biomass Diesel Fuel May 21, 2013 Gasification Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Principal Investigators: Andrew Campos, Steve Anderson, Andrew Lucero Organization: Southern Research Institute Project's Goal/Objective Statement Project Goal * Integrate and demonstrate a hot gasification clean up process

  11. Applicant Location Requested DOE Funds Project Summary Feasibility Studies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requested DOE Funds Project Summary Feasibility Studies Confederated Salish and Kootenai Tribes Pablo, MT $850,000 This project will evaluate the technical and economic viability of a co-generation biomass fuel power plant. The plant would use fuels from tribal forest management activities to provide between 2.5 to 20 megawatts (MW) of electricity to heat tribal buildings or sell on the wholesale market. Standing Rock Sioux Tribe Fort Yates, ND $430,982 This project will perform a feasibility

  12. DOE Extends Advanced Mixed Waste Treatment Project Contract | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Advanced Mixed Waste Treatment Project Contract DOE Extends Advanced Mixed Waste Treatment Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Advanced Mixed Waste Treatment Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, Idaho Treatment Group

  13. DOE Selects Twelve Projects for Crosscutting Technology Research Funding |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Twelve Projects for Crosscutting Technology Research Funding DOE Selects Twelve Projects for Crosscutting Technology Research Funding August 11, 2015 - 12:16pm Addthis The U.S. Department of Energy's National Energy Technology Laboratory (NETL) has selected 12 projects to receive funding through its Crosscutting Research Program's Transitional Technology Development to Enable Highly Efficient Power Systems with Carbon Management initiative. The NETL Crosscutting

  14. DOE LDRD Project List FY 2015.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ID Project Name FY Total FY2013-MAKl-0513 Demistifying the hydration layer on nano oxide in suspensions by liquid cell Transmission Electron Microscopy $2,183 FY2013-VDOB-0909 Theory and Simulation of Solid-State Nuclear Magnetic Resonance for Characterization of New Materials $116,297 FY2014-LOG-1212 Self-Healing Adaptive Structural Coatings $16,357 FY2014-LWA-0413 Adsorption-induced Shape-changing in Nano alloys: Extended Alloy Wulff Construction with First- principles Calculations $83,539

  15. DOE Signs Cooperative Agreement for Carbon Capture Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Carbon Capture Project DOE Signs Cooperative Agreement for Carbon Capture Project June 18, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has signed a cooperative agreement with NRG Energy Inc. (NRG) for the Parish Post-Combustion CO2 Capture and Sequestration Project to design, construct, and operate a system that will capture and store approximately 400,000 tons of carbon dioxide (CO2) per year. The project, which will be managed by the Office of Fossil

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Bio-Oil Technology Area Review May 22, 2013 Zia Abdullah Battelle Memorial Institute John Lee Pacific Northwest National Laboratory 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Upgrading of Biomass Fast Pyrolysis Oil (Bio-oil) * *2 Goal/Objective Statement Develop a hydroprocessing system & catalysts tailored for the Catalytic Bio-Oil produced by Battelle's Ex Situ

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avello ® and Bioasphalt® are trademarks of Avello Bioenergy, Inc. Copyright © 2013 All rights reserved. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Demonstration of Pyrolysis Biorefinery Concept for Biopower, Biomaterials and Biochar May 20, 2013 Bio-Oil Technology Area Review Dennis S Banasiak, PhD Avello Bioenergy, Inc. This presentation does not contain any proprietary, confidential, or otherwise restricted information TM Avello ® and Bioasphalt® are trademarks of

  18. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RTI International is a trade name of Research Triangle Institute. www.rti.org 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review WBS 3.3.1.9 - Catalytic Upgrading of Thermochemical Intermediates to Hydrocarbons May 22, 2013 Bio-Oil Technology Area Review David C. Dayton, PI RTI International This presentation does not contain any proprietary, confidential, or otherwise restricted information RTI International Goals and Objectives Objective: Demonstrate an advanced biofuels

  19. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Bioenergy Technologies Office (BETO) Project Peer Review National Advanced Biofuels Consortium May 20, 2013 Thomas D. Foust NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 What is the NABC? * The National Advanced Biofuels Consortium (NABC) is a collaboration among U.S. Department of Energy national laboratories, universities, and private industry that is developing technologies to produce infrastructure- compatible, biomass-based

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bio-Oil Technology Area Review Joseph Libera and Jeffrey Elam 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review 3.3.1.11. Selective Deoxygenation Catalysts This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement 2  Develop and demonstrate catalysts synthesized by Atomic Layer Deposition for long-lived service in deoxygenation of biomass pyrolysis oil.  FOA - none  Effective and long-lived catalysts

  1. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review New Technology for Hydroprocessing Bio-oils to Fuels May 20, 2013 Bio-Oil Technology Area Review Stephen R. Schmidt Grace New Business Development/Catalysts This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement 2 Goal: demonstrate viability of a new reactor technology and improved-stability catalyst(s) for hydrotreating pyrolysis oils to yield transportation

  2. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Laboratory Innovation for Our Energy Future 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Targeted Conversion Research Date: 5/20-5/24 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Michael E. Himmel Organization: NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information *On many slides, the slide notes section has important additional information* National Renewable Energy

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Producing Transportation Fuels via Photosynthetically-derived Ethylene * Date: May 22, 2013 * Technology Area Review: Biochemical Conversion * Principal Investigator: Jianping Yu * Organization: National Renewable Energy Laboratory This presentation does not contain

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation does not contain any proprietary, confidential, or otherwise restricted information 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Renewable Enhanced Feedstocks for Advanced Biofuels and Bioproducts (REFABB) Date: May 23 rd 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Oliver P. Peoples, PhD Organization: Metabolix © 2013 Metabolix 2 Goal Statement Goals and Technology Fit Technology Area Fit The goal of the REFABB

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review 6.5.2.5 China Task May 20-23, 2013 Feedstock Production and Logistics Platform Christopher T. Wright, PhD Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Biomass Program eere.energy.gov * Establish a U.S. and China international feedstock working group to identify and research barriers in biomass production, logistics, and feedstock quality for

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2.5.8 - Integrated Catalyst Fundamentals May 21, 2013 Thermochemical Conversion Kim Magrini, Robert Dagle, Mark Gerber Organizations: NREL, PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement Project Goal - Develop and demonstrate warm and hot gas conditioning processes for biomass-derived syngas for ethanol synthesis so that DOE can meet or exceed ethanol cost targets * Down

  7. DOE Completes Large-Scale Carbon Sequestration Project Awards | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards November 17, 2008 - 4:58pm Addthis Regional Partner to Demonstrate Safe and Permanent Storage of 2 Million Tons of CO2 at Wyoming Site WASHINGTON, DC - Completing a series of awards through its Regional Carbon Sequestration Partnership Program, the U.S. Department of Energy (DOE) today awarded $66.9 million to the Big Sky Regional Carbon Sequestration Partnership for the

  8. DOE Announces Webinars on Resources for Tribal Energy Efficiency Projects,

    Energy Savers [EERE]

    Deep Energy Retrofits and More | Department of Energy Resources for Tribal Energy Efficiency Projects, Deep Energy Retrofits and More DOE Announces Webinars on Resources for Tribal Energy Efficiency Projects, Deep Energy Retrofits and More November 26, 2013 - 4:16pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however, advanced

  9. DOE Announces $14 Million Industry Partnership Projects to Increase Fuel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency | Department of Energy 4 Million Industry Partnership Projects to Increase Fuel Efficiency DOE Announces $14 Million Industry Partnership Projects to Increase Fuel Efficiency May 26, 2005 - 1:02pm Addthis WASHINGTON, DC - Secretary of Energy Samuel Bodman today announced a public-private partnership between the Department of Energy, industry and academia aimed at significantly improving the vehicle efficiency of cars and trucks through advances in technology. The partnership

  10. DOE Selects Project to Help Advance More Efficient Supercritical Carbon

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dioxide-Based Power Cycles | Department of Energy Project to Help Advance More Efficient Supercritical Carbon Dioxide-Based Power Cycles DOE Selects Project to Help Advance More Efficient Supercritical Carbon Dioxide-Based Power Cycles August 3, 2015 - 10:25am Addthis The U.S. Department of Energy's National Energy Technology Laboratory (NETL) has selected Thar Energy, LLC to develop new recuperator technologies leading to more cost-effective and efficient supercritical carbon dioxide

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrading of Pyrolysis Bio-oils May 23, 2013 Thermochemical Conversion Platform Lance Lobban, PI Daniel Resasco, Richard Mallinson, Sub Gollahalli, Kumar Parthasarathy Co-PIs University of Oklahoma This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Goal To develop the fundamental catalyst and process knowledge required to design upgrading strategies of pyrolysis bio-oil (vapor and liquid) to achieve a stable product. Specific project

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Optimized Co-processing of Algal Bio-Crude Through a Petroleum Refinery 23 May 2013 Bio-Oil Technology Area Review Benjamin Saydah Sapphire Energy Goal/Objective Statement * Sapphire produces an algae bio-crude that is similar to petroleum crude oil * This project will establish the optimal refinery operating conditions required to upgrade algae bio-crude produced via the Sapphire process * Identifying the operating conditions

  13. SASSI Subtraction Method Effects at Various DOE projects

    Office of Environmental Management (EM)

    Subtraction Method Effects at Various DOE projects U.S. Department of Energy Natural Phenomena Hazards Workshop October 25-26, 2011 Greg E. Mertz, Michael C. Costantino, Thomas W. Houston, Andrew S. Maham CJCAssociates 2 Outline  PF-4  CMRR  UPF  Generic Study  Lessons Learned Note: Project results represent work-in-progress and do imply regulatory acceptance CJCAssociates 3 SASSI Solution Methods for Embedded Structures CJCAssociates 4 PF-4 Two story Box-type RC Structure

  14. DOE Announces Webinars on Tribal Energy Project Financing, Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Re-tuning for Energy Efficiency, and More | Department of Energy Tribal Energy Project Financing, Building Re-tuning for Energy Efficiency, and More DOE Announces Webinars on Tribal Energy Project Financing, Building Re-tuning for Energy Efficiency, and More August 20, 2014 - 4:27pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the clean energy workforce. Webinars are free;

  15. DOE Supports Renewable Energy Deployment Projects for Forest County

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potawatomi Community | Department of Energy Supports Renewable Energy Deployment Projects for Forest County Potawatomi Community DOE Supports Renewable Energy Deployment Projects for Forest County Potawatomi Community July 21, 2014 - 12:03pm Addthis Anaerobic digesters reduce pollution and generate electricity in Milwaukee. | Image from Forest County Potawatomi Community Anaerobic digesters reduce pollution and generate electricity in Milwaukee. | Image from Forest County Potawatomi

  16. DOE's Launch of High-Efficiency Thermiekectrics Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Launch of High-Efficiency Thermiekectrics Projects DOE's Launch of High-Efficiency Thermiekectrics Projects 2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: U.S. Department of Energy, EERE 2004_deer_fairbanks2.pdf (1.53 MB) More Documents & Publications Inorganic-Organic Hybrid Thermoelectrics Inorganic-Organic Hybrid Thermoelectrics The 60% Efficient Diesel Engine: Probably, Possible, Or Just a Fantasy?

  17. DOE - Office of Legacy Management -- Project Gnome Site - NM 12

    Office of Legacy Management (LM)

    Gnome Site - NM 12 FUSRAP Considered Sites Site: Project Gnome Site (NM.12) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gnome-Coach, New Mexico, Site Documents Related to Project Gnome Site Conditional Certificate of Completion. Attached letter from New Mexico Environment Department of DOE dated September 25, 2014. Fact Sheet

  18. Model Language for Project Agreements Between DOE National Laboratories and Recipient Russian Institutes

    Broader source: Energy.gov [DOE]

    Model Language for Project Agreements Between DOE National Laboratories and Recipient Russian Institutes

  19. DOE Awards Task Order for Lexington Project Office Audit

    Broader source: Energy.gov [DOE]

    Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Office (BETO) Project Peer Review Defining Sustainability Date: May 22, 2013 Technology Area Review: Analysis and Sustainability Principal Investigator: Virginia Dale Organization: Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information. Goal Statement * Goal: To ensure long term supply of sustainable feedstock and bioenergy by determining - How bioenergy production can affect sustainability - How those

  1. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US-India Consortium For Development of Sustainable Advanced Lignocellulosic Biofuels Systems Date: May 22, 2013 Technology Area Review: Biochemical Conversion Dr. Pratap Pullammanappallil, University of Florida Dr. Shibu Jose, University of Missouri Dr. Janaki Alavalapati, Virginia Tech This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement 2 The project goals: * Sustainable switchgrass feedstock development using marginal lands. *

  2. DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone

    Broader source: Energy.gov [DOE]

    In a project sponsored by the U.S. Department of Energy (DOE), a demonstration-scale application of RTI International’s warm synthesis gas (syngas) cleanup process technology has achieved a key operational milestone at Tampa Electric Company’s coal gasification plant in Polk County, Fla.

  3. DOE/SC Lehman Review of US ITER Project, USIPO,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SC Lehman Review of US ITER Project, USIPO, Oak Ridge, Tennessee, April 5-7, 2011 - Ned Sauthoff Project Manager, US ITER INSIDE: ITER Site Progress Secret City View from DOE US Project Highlights Engaging Industry New PPPL Head of ITER Department PPPL to Cadarache New Division Director Positions Open at US ITER Upcoming Events ORNL 2011-G00858/jpp It has been a busy season for US ITER, as the team positions for fabrication in late-FY 12 and FY 13. Our priorities remain completing designs,

  4. "DOE IDIQ ESPC Awarded Projects Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE IDIQ ESPC Awarded Projects Summary August 2016 " ,"Project Count","Project Investment","Guaranteed Cost Savings","Contract Price","Annual Energy Savings (btu x 10^6)","Cumulative Energy Savings (btu x 10^6)" "Total for FY 1998",5,6575201,17162375,14990629,60931,783240 "Total for FY 1999",15,40950583,94265528,93441996,340539,5660293 "Total for FY 2000",20,62161736,131703866,130641996,609730,9510029

  5. DOE Extends Idaho Cleanup Project Contract | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project Contract DOE Extends Idaho Cleanup Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Idaho Cleanup Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, CH2M-WG Idaho, LLC, had been scheduled to expire on September 30, 2015. Today's contract

  6. The Nucla Circulating Fluidized-Bed Demonstration Project: A U.S. DOE post-project assessment

    SciTech Connect (OSTI)

    1995-06-01

    This report is a post-project assessment of the Nucla Circulating Fluidized-Bed (CFB) Demonstration Project, the second project to be completed in the DOE Clean Coal Technology Program. Nucla was the first successful utility repowering project in the US, increasing the capacity of the original power station from 36 MW(e) to 110 MW(e) and extending its life by 30 years. In the CFB boiler, combustion and desulfurization both take place in the fluidized bed. Calcium in the sorbent captures sulfur dioxide and the relatively low combustion temperatures limit NOx formation. Hot cyclones separate the larger particles from the gas and recirculates them to the lower zones of the combustion chambers. This continuous circulation of coal char and sorbent particles is the novel feature of CFB technology. This demonstration project significantly advanced the environmental, operational, and economic potential of atmospheric CFB technology, precipitating a large number of orders for atmospheric CFB equipment. By 1994, more than 200 atmospheric CFB boilers have been constructed worldwide. Although at least six CFB units have been operated, the Nucla project`s CFB database continues to be an important and unique resource for the design of yet larger atmospheric CFB systems. The post-project assessment report is an independent DOE appraisal of the success a completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology as well as an analysis of the commercial market.

  7. DOE Awards Supercomputer Access to Cutting-Edge Projects | U.S. DOE Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Science (SC) DOE Awards Supercomputer Access to Cutting-Edge Projects News News Home Featured Articles Science Headlines 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.18.08 DOE Awards Supercomputer Access to Cutting-Edge Projects Print Text Size: A

  8. Los Alamos among new DOE projects to create new technology pathways...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New DOE projects for low-cost fusion energy development Los Alamos among new DOE projects to create new technology pathways for low-cost fusion energy development Three of the projects ...

  9. DOE R&D Project Summaries | OSTI, US Dept of Energy, Office of...

    Office of Scientific and Technical Information (OSTI)

    R&D Project Summaries The DOE R&D Project Summaries product has been discontinued. All of the information in DOE R&D Project Summaries can be found in SciTech Connect. Please visit ...

  10. Nevada Environmental Restoration Project DOE/NV-368 Project Chariot S

    Office of Legacy Management (LM)

    Environmental Restoration Project DOE/NV-368 Project Chariot S i t e Assessment and Remedial Action Final Report Environmental Restoration August 1994 This report has been reproduced from the best available copy. Available in paper copy and microfiche. Number of pages in this report: 226 DOE and DOE contractors can obtain copies of this report from: Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831. (61 5) 576-8401. This report is publicly available from the

  11. DOE CD-4 Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE CD-4 Review of the MINERvA Project Main INjector ExpeRiment v-A May 12, 2010 | Overview | CD-4 Documentation| Other Documents| Overview of Charge and Experiment MINERvA Overview (2.2 MB pdf) Review Agenda (all times EDT) (pdf) Review Charge (pdf) Review Presentation by MINERvA Project (DRAFT until the week of May 12) (docdb page) Required CD-4 Documentation CD-4 Document Checklist (pdf) Technical Requirements Completion Document (pdf) Quality Assurance Plan (pdf) Safety Documentation Hazard

  12. DOE-GTO Low Temperature Project Case Study

    SciTech Connect (OSTI)

    Williams, Tom; Mines, Greg

    2015-09-02

    The US Department of Energy (DOE), Geothermal Technologies Office (GTO) has funded low temperature projects to demonstrate the technical and economic feasibility of power generation from geothermal resources at temperatures of 150 degrees C and lower. To date three of the funded projects have completed their two year operation phase during which they supplied operating data to the GTO. This paper discusses the operation of two of these plants while they were providing data, including a review of facility performance, as well as an initial economic assessment of each.

  13. PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM Biomass Technologies: Harvesting/Dewatering Technology for Algal Biofuels Renewable Algal Energy, LLC (Kingsport, Tenn.) - Algal Biodiesel via Innovative Harvesting and Aquaculture Systems - Renewable Algal Energy LLC, will leverage its experience in algal aquaculture, harvesting, and extraction, to demonstrate at small commercial-scale, improved, low cost, energy-efficient methods for harvesting and dewatering algae that

  14. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office (BETO) Project Peer Review 9.1.3.2 Microalgal Harvesting/ Dewatering and Algae Feedstock Logistics May 20, 2013 Algae Platform Deborah Newby, Ph.D. Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement To advance algal biofuel feasibility through: * Investigation of algal dewatering * Consideration of post harvest stability * Characterization of algae feedstock and its potential use in formulated

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GCAM Bioenergy and Land Use Modeling May 21, 2013 Technology Area Review: Analysis and Sustainability Principal Investigator: Marshall Wise Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * The main objective is to model and study the long-term global potential and role of bioenergy using the PNNL Global Change Assessment Model (GCAM) - Project supports BETO

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries May 20, 2013 Bio-Oil Technology Area Review Robert C. Brown Iowa State University This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement * The goal of this project is to develop pyrolysis intermediates suitable as feedstocks for upgrading in a petroleum refinery. Specific objectives include: - Production of four upgrading fractions of bio-oil -

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Liquefaction of Forest Biomass to "Drop-in" Hydrocarbon Biofuels May 23, 2013 Bio-Oil Technology Area Review Robert C. Brown Iowa State University This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement * Project Goal: Demonstrate solvent liquefaction as a viable pathway to stable intermediates that can be upgraded to fuel blendstocks * Funding Opportunity Announcement DE-FOA-00005100 * R&D, demonstration, and

  18. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integration and Scale Up WBS# 3.3.1.13 May 22, 2013 Technology Area Review: Bio-Oils Mark Davis and Esther Wilcox Organizations: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Project Goal: Demonstrate/validate the individual unit operations along with integrated production of cost competitive hydrocarbons at the pilot scale Objectives - Construct a

  19. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Refinery Upgrading of Hydropyrolysis Oil from Biomass May 23, 2012 Bio-Oil Technology Area Review Terry Marker GTI This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Goals and Objectives * Develop a cost effective route for converting biomass to transportation fuels by - Converting biomass to hydropyrolysis oil - Upgrading the hydropyrolysis oil in a petroleum refinery using existing refinery equipment - Working closely with a major

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southern Pine Based Biorefinery Center May 20 - 23, 2013 Bio-Oil Technology Area Review Project WBS: 7.5.7.3 Art J. Ragauskas Institute of Paper Science and Technology School of Chemistry and Biochemistry Georgia Institute of Technology, Atlanta, GA This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement Leveraging kraft pulp mill infrastructure for biofuels and bio- based materials via pine wood, pine residues, and kraft

  1. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Peer Review LBNL PDU Support Advanced Biofuels Process Demonstration Unit The First Year Date: May 22, 2013 Technology Area Review: Biochemical Conversion WBS 2.3.1.6 Principal Investigator: Julio Baez Organization: Lawrence Berkeley National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Established that the unit can enable researchers (public & private) to evaluate, adapt, develop, demonstrate, and transfer

  2. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineering yeast consortia for surface-display of complex cellulosome structures: A consolidated bioprocessing approach from cellulosic biomass to ethanol Date: May 21, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Wilfred Chen Organization: University of Delaware This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * The goal of the project is to develop a synthetic yeast consortium for direct

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (BETO) Project Peer Review 1.3.1.3 Feedstock Logistics Fundamentals Date: May 21, 2013 Technology Area Review: Feedstock Supply & Logistics Presenter: Jaya Shankar Tumuluru Principal Investigators: Jeff Lacey, Jaya Shankar Tumuluru, David Thompson, Vicki Thompson Organization: Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Energy Efficiency & Renewable Energy eere.energy.gov 2 Develop and demonstrate

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Genera Energy Inc. ● 167 Tellico Port Road ● Vonore, TN 37885 Development of a Bulk-Format System to Harvest, Handle, Store, and Deliver High-Tonnage Low-Moisture Switchgrass Feedstock 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review May 19-23, 2013 Feedstock Supply & Logistics Al Womac, University of Tennessee Lead Organization: Genera Energy Inc. Goal Statement  Develop and test bulk-format logistics for low-moisture switchgrass incorporating bulk-handled loose,

  5. 2013 DOE Bioenergy Technologies Office Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Peer Review Sorghum as an Energy Feedstock: Production, Logistics, Economics William L. Rooney, Professor Texas A&M University May 20, 2013 Background  Sorghum was identified as an energy crop by DOE ◉ high biomass yield ◉ Structural carbohydrates ◉ Non-structural carbohydrates ◉ drought tolerance ◉ established production systems ◉ annual life cycle ◉ genetic resources and potential for further improvement ◉ available hybrids Background and Goal  Limited

  6. DOE-University of Arizona Faculty Development Project. Final report

    SciTech Connect (OSTI)

    Fillerup, Joseph M.

    1980-09-08

    The DOE-University of Arizona Faculty Development Project on Energy successfully completed a faculty development program. There were three phases of the program consisting of: a three week energy workshop for teachers, participation and cooperation with Students for Safe Energy in presentation of an Alternative Energy Festival at the University of Arizona, and workshops for teachers conducted at Flowing Wells School District. Each of these is described. Attendees are listed and a director's evaluation of the workshop is given.

  7. DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program New Fuel Cell Projects Kickoff Meeting Patrick Davis Acting Program Manager February 13, 2007 Washington, DC Mission The Program's over arching goal is to reduce or eliminate dependence on foreign oil. Mission: To research, develop, and validate fuel cell and hydrogen production, delivery, and storage technologies. Hydrogen from diverse domestic resources will then be used vehicles and stationary power applications. in a clean, safe, reliable, and affordable manner in fuel cell DOE

  8. 2015 Carbon Storage Project Review Meeting | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carbon Storage R&D Project Review Meeting Meeting Summary Presentations Tuesday, August 18, 2015 OPENING PLENARY SESSION - KEYNOTE PRESENTATION Transforming Technology Through Integration and Collaboration Grace M. Bochenek, Ph.D., Director, U.S. Department of Energy, National Energy Technology Laboratory DOE's Clean Coal RD&D Program Mark Ackiewicz, Office of Fossil Energy, U.S. Department of Energy Overview of the Norwegian RD&D CCS Program (CLIMIT) Hans Jörg Fell, Gassnova IEAGHG

  9. DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014

    Broader source: Energy.gov [DOE]

    ACQUISITION AND PROJECT MANAGEMENT GLOSSARY OF TERMS HANDBOOK This handbook provides definitions of acquisition and project management terms commonly used in DOE projects to ensure consistent use of terms in DOE project documents and discussions. DOE APM Glossary of Terms Handbook – Final, September 2014

  10. Unique Lanthide-Free Motor Construction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unique Lanthanide-Free Motor Construction Josh Ley, Principal Investigator Jon Lutz, Presenter Alan Gilbert, Program Manager UQM Technologies, Inc. April 21, 2014 APE044 This presentation does not contain any proprietary, confidential, or otherwise restricted information Overview Timeline Project start date: 10/01/2011 Project end date: 10/31/2015 Percent complete: 60% Budget Total project funding - $2,667K DOE Share - $889K UQM Share Funding received in FY13: $765K Funding for FY14: $806K

  11. Draft - DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  12. Final Report for DOE Project: Portal Web Services: Support of DOE SciDAC Collaboratories

    SciTech Connect (OSTI)

    Mary Thomas, PI; Geoffrey Fox, Co-PI; D. Gannon; M. Pierce; R. Moore; D Schissel; J. Boisseau

    2007-10-01

    Grid portals provide the scientific community with familiar and simplified interfaces to the Grid and Grid services, and it is important to deploy grid portals onto the SciDAC grids and collaboratories. The goal of this project is the research, development and deployment of interoperable portal and web services that can be used on SciDAC National Collaboratory grids. This project has four primary task areas: development of portal systems; management of data collections; DOE science application integration; and development of web and grid services in support of the above activities.

  13. Construction Begins on DOE-Sponsored Carbon-Capture Project at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction Begins on DOE-Sponsored Carbon-Capture Project at Kentucky Power Plant Construction Begins on DOE-Sponsored Carbon-Capture Project at Kentucky Power Plant July 21, ...

  14. DOE O 413.3B Program and Project Management for the Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B Program and Project Management for the Acquisition of Capital Assets DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets On November 29, 2016, DOE O ...

  15. DOE-Funded Project Develops Safer Access to Offshore Wind Turbine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-Funded Project Develops Safer Access to Offshore Wind Turbine Platforms DOE-Funded Project Develops Safer Access to Offshore Wind Turbine Platforms September 10, 2015 - 6:21pm ...

  16. DOE Tour of Zero Floorplans: McKinley Project by Carl Franklin...

    Energy Savers [EERE]

    Zero Floorplans: McKinley Project by Carl Franklin Homes and Green Extreme Homes DOE Tour of Zero Floorplans: McKinley Project by Carl Franklin Homes and Green Extreme Homes DOE...

  17. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's ... The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global ...

  18. DOE Zero Energy Ready Home Case Study: Shore Road Project - Old...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shore Road Project - Old Greenwich, Connecticut DOE Zero Energy Ready Home Case Study: Shore Road Project - Old Greenwich, Connecticut Case study of a DOE Zero Energy Ready Home in ...

  19. DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project...

    Energy Savers [EERE]

    Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda DOE Hydrogen ...

  20. 1992 DOE/Sandia crystalline photovoltaic technology project review meeting

    SciTech Connect (OSTI)

    Maish, A.

    1992-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia National Laboratories` Photovoltaic Technology and Photovoltaic Evaluation Departments. It contains information supplied by organizations making presentations at the meeting, which was held July 14--15, 1992 at the Sheraton Old Town Hotel in Albuquerque, New Mexico. Overview sessions covered the Department of Energy (DOE) program, including those at Sandia and the National Renewable Energy Laboratory (NREL), and non-DOE programs, including the EPRI concentrator collector program, The Japanese crystalline silicon program, and some concentrating photovoltaic activities in Europe. Additional sessions included papers on Sandia`s Photovoltaic Device Fabrication Laboratory`s collaborative research, cell processing research, the activities of the participants in the Concentrator Initiative Program, and photovoltaic technology evaluation at Sandia and NREL.

  1. PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3 PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM - pg 3 sbir_phase3_pg3.pdf (227.38 KB) More Documents & Publications SBIR_Phase_III.pdf PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM Albany HTS Power Cable

  2. Solid-State Lighting Patents Resulting from DOE-Funded Projects |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 2013 DOE Solid-State Lighting Program Fact Sheet patents_factsheet_feb2013.pdf (797.7 KB) More Documents & Publications Solid-State Lighting Patents Resulting from DOE-Funded Projects Solid-State Lighting Patents Resulting from DOE-Funded Projects 2014 Solid-State Lighting Project Portfolio

  3. Solid-State Lighting Patents Resulting from DOE-Funded Projects |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 2014 DOE Solid-State Lighting Program Fact Sheet patents_factsheet_jan2014.pdf (809.47 KB) More Documents & Publications Solid-State Lighting Patents Resulting from DOE-Funded Projects Solid-State Lighting Patents Resulting from DOE-Funded Projects 2015 Project Portfolio

  4. DOE Order Program and Project Management for the Acquisition of Capital

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assets | Department of Energy Safety » DOE Order Program and Project Management for the Acquisition of Capital Assets DOE Order Program and Project Management for the Acquisition of Capital Assets The goal of this Guide is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan, implement and complete their assigned project(s) using a Systems Engineering approach. DOE Order

  5. DOE EM Project Experience & Lessons Learned for In Situ Decommissioning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Feb. 2013) | Department of Energy EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of the "DOE EM Project Experience & Lessons Learned for In Situ Decommissioning" report is to capture the considerable technical experience gained to date for implementation of In Situ Decommissioning (ISD) projects at DOE facilities. As current and projected

  6. New - DOE G 415.1-2, INFORMATION TECHNOLOGY PROJECT EXECUTION MODEL GUIDE FOR SMALL AND MEDIUM PROJECTS

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives.

  7. DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy New Fuel Cell Projects Kickoff Meeting DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting Presentation by DOE's Patrick Davis at a meeting on new fuel cell projects on March 13, 2007. new_fc_davis_doe.pdf (1.21 MB) More Documents & Publications Federal Support for Hydrogen and Fuel Cell Technologies Overview of the DOE Hydrogen Program (Presentation) FY 2003 Progress Report for Hydrogen, Fuel Cells and Infrastructure Technologies Program

  8. SC Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    OPA Home About Project Management SC Projects Review Dates (updated July 2016) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact ...

  9. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Completed Projects Print Text

  10. Ongoing Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Current Projects Print Text Size:

  11. DOE Awards Supercomputer Access to Cutting-Edge Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Supercomputer Access to Cutting-Edge Projects DOE Awards Supercomputer Access to Cutting-Edge Projects December 18, 2008 - 8:51am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science announced today that 66 projects addressing some of the greatest scientific challenges have been awarded access to some of the world's most powerful supercomputers at DOE national laboratories. The projects-competitively selected for their technical readiness and scientific

  12. DOE Vehicle Technologies Program 2009 Merit Review Report - PI and Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cross Reference | Department of Energy PI and Project Cross Reference DOE Vehicle Technologies Program 2009 Merit Review Report - PI and Project Cross Reference Merit review of DOE Vehicle Technologies Program research efforts 2009_merit_review_12.pdf (766.22 KB) More Documents & Publications 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project Investigators, Projects, and Organizations 2010 Annual Merit Review Results Cross Reference of PIs and Organizations DOE

  13. DOE-GTO Low Temperature Project Case Study (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    DOE-GTO Low Temperature Project Case Study Citation Details In-Document Search Title: DOE-GTO Low Temperature Project Case Study The US Department of Energy (DOE), Geothermal Technologies Office (GTO) has funded low temperature projects to demonstrate the technical and economic feasibility of power generation from geothermal resources at temperatures of 150 degrees C and lower. To date three of the funded projects have completed their two year operation phase during which they supplied operating

  14. DOE Alaska Native Village Renewable Energy Project Development Workshop

    Broader source: Energy.gov [DOE]

    Presented by the U.S. Department of Energy's (DOE's) Office of Indian Energy with support from DOEs National Renewable Energy Laboratory, this interactive workshop will walk participants through...

  15. 2015 Carbon Storage Project Review Meeting | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... PROJECTS Cranfield Project, Southeast Regional Carbon Sequestration Partnership ... of Texas at Austin, Bureau of Economic Geology Bell Creek Field Project, Plains CO2 ...

  16. Project Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Project Assessment (OPA) OPA Home About Project ... Rates Earned Value Management System (EVMS) Certifications ... Project Assessment U.S. Department of Energy SC-28...

  17. completed-ng-projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completed Natural Gas and Unconventional Resources Projects Project Number Project Name Primary Performer 09122-32 A Geomechanical Model for Gas Shales Based on the Integration of ...

  18. DOE Announces $16 Million for 54 Projects to Help Commercialize Promising

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Technologies | Department of Energy $16 Million for 54 Projects to Help Commercialize Promising Energy Technologies DOE Announces $16 Million for 54 Projects to Help Commercialize Promising Energy Technologies June 21, 2016 - 2:52pm Addthis News Media Contact 202-586-4940 DOENews@hq.doe.gov WASHINGTON -The U.S. Department of Energy (DOE) today announced nearly $16 million in funding to help businesses move promising energy technologies from DOE's National Laboratories to the

  19. FRIB reviewed favorably by DOE Office of Project Assessment (Michigan State

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    University, Facility for Rare Isotope Beams) | Jefferson Lab www.frib.msu.edu/content/frib-reviewed-favorably-doe-office-project-asses...

  20. DOE Awards Contract for Idaho Clean-up Project (ICP) Core | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Idaho Clean-up Project (ICP) Core DOE Awards Contract for Idaho Clean-up Project (ICP) Core February 4, 2016 - 6:15pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in

  1. DOE Selects 53 New Projects Focused on Wind Energy for up to $8.5 Million |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 53 New Projects Focused on Wind Energy for up to $8.5 Million DOE Selects 53 New Projects Focused on Wind Energy for up to $8.5 Million May 6, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Steven Chu today announced selection of 53 new wind energy projects for up to $8.5 million in total DOE funding. These projects will help begin to address market and deployment challenges identified in DOE's 2008 report: "20% Wind Energy by

  2. The Nagra-DOE Cooperative Project (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    FLOW; ROCKS; SWITZERLAND; US DOE; GEOLOGY; HYDROLOGY; GEOLOGIC FRACTURES; TWO-PHASE FLOW; WELLS; YUCCA MOUNTAIN; GEOCHEMISTRY; COORDINATED RESEARCH PROGRAMS; Yucca Mountain Project

  3. DOE Announces up to $29.3 Million in Projects for Research, Developmen...

    Energy Savers [EERE]

    Development, and Demonstration of Alternative Vehicle Technologies DOE Announces up to 29.3 Million in Projects for Research, Development, and Demonstration of Alternative ...

  4. Final Report: DOE Project: DE-SC-0005399 Linking the uncertainty...

    Office of Scientific and Technical Information (OSTI)

    Linking the uncertainty of low frequency variability in tropical forcing in regional climate change Citation Details In-Document Search Title: Final Report: DOE Project:...

  5. DOE-STD-1149-2002; Safety and Health Program for DOE Construction Projects

    Office of Environmental Management (EM)

    Changes to DOE-STD-1128-98, "Guide for Occupational Radiological Protection in Plutonium Facilities Section/Page Change Cover Change "Metric" to "Not Measurement Sensitive". Throughout the document Change "the DOE Radiological Control Manual (RCM)" to "the DOE standard DOE- STD-1098-99, Radiological Control (RCS)". Change "RCM" to "RCS". Replace (DOE, 1993c) with (DOE, 1998a). Replace (DOE, 19941) with (DOE, 1999b). Delete

  6. DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Projects September 18, 2008 - 3:43pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of projects for negotiation of award of up to 7.3...

  7. Third Buried Waste Retrieval Project under way at DOE Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Third Buried Waste Retrieval Project under way at DOE Idaho Site The Idaho Cleanup Project has recently begun removing Cold War weapons waste from a third retrieval area at the ...

  8. DOE O 413.3A Change 1 - Program and Project Management for the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Change 1 - Program and Project Management for the Acquisition of Capital Assets DOE O 413.3A Change 1 - Program and Project Management for the Acquisition of Capital Assets ...

  9. DOE Announces $11 Million for Seven New Projects to Test New...

    Energy Savers [EERE]

    for Seven New Projects to Test New Options for Optimal Efficiency of the U.S. Electric Grid DOE Announces 11 Million for Seven New Projects to Test New Options for Optimal ...

  10. DOE and NREL Issue Sources Sought for Wind for Schools Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sought for Wind for Schools Project Sustainability Plan DOE and NREL Issue Sources Sought for Wind for Schools Project Sustainability Plan January 12, 2016 - 12:55pm Addthis ...

  11. Eight Advanced Coal Projects Chosen for Further Development by DOE's University Coal Research Program

    Broader source: Energy.gov [DOE]

    DOE has selected eight new projects to further advanced coal research under the University Coal Research Program. The selected projects will improve coal conversion and use and will help propel technologies for future advanced coal power systems.

  12. DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting | Department of Energy Delivery High-Pressure Tanks and Analysis Project Review Meeting DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting On February 8-9, 2005, the Department of Energy held the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting at Argonne National Laboratory. The purpose of the meeting was to review the progress and plans of the R&D projects and to facilitate collaboration among researchers. The

  13. DOE Hydrogen Pipeline R&D Project Review Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline R&D Project Review Meeting DOE Hydrogen Pipeline R&D Project Review Meeting On January 5th and 6th, 2005, the FreedomCAR and Fuels Partnership Hydrogen Delivery Tech Team hosted a project review meeting at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The invitees included industry, university and national laboratory representatives involved in DOE-funded research related to hydrogen distribution via pipelines. Representatives also attended from the NATURALHY project to

  14. DOE to Invest $35 Million in Concentrating Solar Power Projects...

    Broader source: Energy.gov (indexed) [DOE]

    19 that it will invest up to 35 million over the next 4 years in 15 concentrating solar power (CSP) projects which, combined with the project cost-sharing from the project ...

  15. DOE Progress Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    schedule also includes tasks funded by NSF MRI grant) Microsoft Project File (40MB MS Project File) Gantt Chart (pdf) Critical Path (pdf) Costs (Note: unless otherwise...

  16. Department of Energy Guide for Project Execution Plans - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Department of Energy Guide for Project Execution Plans by John Makepeace Functional areas: Program Management, Project Management This directive provides guidance for the...

  17. Staffing Guide for Project Management - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19 Admin Chg 1, Staffing Guide for Project Management by Brian Kong Functional areas: Administrative Change, Program Management, Project Management This Guide provides an approach...

  18. 2016 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to project management, the Project Management Risk Committee, congressional views, ethics, and program perspectives from Environmental Management, Science, and the National...

  19. Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Projects Ames Site Office (AMSO) AMSO Home About Projects Contract Management NEPA Documents Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass ...

  20. Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Projects Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Resources Contact Information Thomas Jefferson Site Office U.S. Department ...

  1. High Level Overview of DOE Biomass Logistics II Project Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Self-Loading Trailer (SLT) Advanced Logistics Project 1 Results Project Summary * 3 ... that will reduce biomass supply chain costs while meeting quality specifications of ...

  2. Project Completion/Closeout Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6A, Project CompletionCloseout Guide by Brian Huizenga Functional areas: Program Management, Program Planning and Management, Project Management The guide provides nonmandatory...

  3. Quality Assurance Guide for Project Management - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Quality Assurance Guide for Project Management by John Makepeace Functional areas: Project Management, Quality Assurance and Oversight This Guide provides acceptable approaches...

  4. DOE-Funded Project Testing Laser CO2 Monitoring at Carbon Storage Site

    Broader source: Energy.gov [DOE]

    A project that uses lasers to monitor carbon dioxide (CO2) is being analyzed as part of the U.S. Department of Energy’s (DOE) drive to improve greenhouse gas-monitoring abilities at CO2 storage sites. The project is managed by the DOE Office of Fossil Energy’s National Energy Technology Laboratory (NETL).

  5. completed_env_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Solutions Completed Projects All Completed Enviromental Solutions Projects Are Listed Below by Category Produced Water | Federal Lands Access | Regulatory Streamlining | Oil Refining Completed Produced Water Management Projects Project Number Project Name Primary Performer DE-NT0005227 Membrane Technology for Produced Water at Lea County, NM Lea County Government, Lovington, NM DE-FE0000833 An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management

  6. DOE Issues Final RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Final RFP for Idaho Cleanup Project Core March 13, 2015 - 2:00pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709, millerdc@id.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be complete in Idaho and remaining nuclear

  7. DOE O 413.3B Program and Project Management for the Acquisition of Capital

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assets | Department of Energy B Program and Project Management for the Acquisition of Capital Assets DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets On November 29, 2016, DOE O 413.3B was updated to replace DOE O 413.3A, Chg 1, dated June 28, 2006, and includes a Contractor Requirements Document (CRD). PF2011-35 DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets (613.53 KB) More Documents & Publications Acquisition Guide

  8. DOE Project Management Risk Committee (PMRC) SOP | Department of Energy

    Energy Savers [EERE]

    Prepares for the 2007 Hurricane Season DOE Prepares for the 2007 Hurricane Season May 30, 2007 - 1:25pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today outlined a number of steps that the Department is taking to strengthen its hurricane response system in the United States. Since Hurricanes Katrina and Rita in 2005, DOE has made operational and administrative improvements, including coordination between federal, state and local leaders, deployment of trained staff, and

  9. DOE extends the Idaho Cleanup Project contract for three years

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE eGuide DOE eGuide April 17, 2014 - 10:45am Addthis What is the DOE eGuide? The DOE eGuide is a toolkit designed to help organizations implement an energy management system through an organized step by step process at three different levels: Foundational, ISO50001 and Superior Energy Performance. It includes forms, checklists, templates, examples, and guidance to assist the Energy Team throughout the implementation process. The five major steps of the eGuide start with the decision to utilize

  10. The Path to Transforming Knowledge into Energy Projects: DOE...

    Broader source: Energy.gov (indexed) [DOE]

    2015 Tribal Renewable Energy Webinar Series and read detailed descriptions about each of the monthly webinars in the flier below. DOE Tribal Renewable Energy Webinar Series 2015...

  11. DOE Announces Clean Energy Projects for Low-Carbon Communities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Americas (LCCA) - a program launched in June 2009 to assist countries in Latin America with sustainable energy market transformation initiatives. "DOE is committed to ...

  12. DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia Presentation by Lennie Klebanoff and Joe Pratt, Sandia National Laboratories, at the DOD-DOE Aircraft Petroleum Use Reduction Workshop, September 30, 2010, in Washington, DC. aircraft_8_klebanoff.pdf (2.42 MB) More Documents & Publications Proton Exchange Membrane Fuel Cells for Electrical Power Generation On-Board

  13. DOE-Sponsored Project Begins Demonstrating CCUS Technology in...

    Broader source: Energy.gov (indexed) [DOE]

    ... Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant Alabama Project Testing Potential for Combining CO2 Storage with Enhanced ...

  14. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect (OSTI)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  15. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect (OSTI)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  16. Certified Federal Project Directors | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Certification of DOE Reading Rooms Certification of DOE Reading Rooms Certification of DOE Reading Rooms by Ingrid Kolb, Chief FOIA Officer, October, 17, 2008. (57.79 KB) More Documents & Publications Memorandum from Secretary Moniz on the Freedom of Information Act (FOIA) Before the Subcommittee on National Parks - Senate Committee on Energy and Natural Resources DRAFT 2012 DOE Project Management Workshop Agenda

    and Assurances for Use with SF-424 Certifications and Assurances for Use

  17. NASA and DOE Jefferson Lab Agree to Explore Mutual Research Projects |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jefferson Lab and DOE Jefferson Lab Agree to Explore Mutual Research Projects NASA and DOE Jefferson Lab Agree to Explore Mutual Research Projects Two local research powerhouses have agreed to explore projects of mutual interest - like "growing" hair-like microscopic "nano" structures at the atomic level for optimum performance. Such a high-performance composite structure could result in an improved golf club shaft, for example, or any consumer, industrial or defense

  18. DOE and NREL Issue Sources Sought for Wind for Schools Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainability Plan | Department of Energy and NREL Issue Sources Sought for Wind for Schools Project Sustainability Plan DOE and NREL Issue Sources Sought for Wind for Schools Project Sustainability Plan January 12, 2016 - 12:55pm Addthis The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy (DOE), today issued a formal notice of intent for organizations interested in developing a Sustainability Plan for the Wind for Schools project. This

  19. DOE to Invest $30 Million in Projects Developing Components for Advanced

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbine and Supercritical CO2-Based Power Cycles | Department of Energy to Invest $30 Million in Projects Developing Components for Advanced Turbine and Supercritical CO2-Based Power Cycles DOE to Invest $30 Million in Projects Developing Components for Advanced Turbine and Supercritical CO2-Based Power Cycles July 19, 2016 - 9:57am Addthis The U.S. Department of Energy's (DOE) National Energy Technology Laboratory has selected six Phase II projects, to further develop innovative

  20. DOE Announces up to $29.3 Million in Projects for Research, Development,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Demonstration of Alternative Vehicle Technologies | Department of Energy up to $29.3 Million in Projects for Research, Development, and Demonstration of Alternative Vehicle Technologies DOE Announces up to $29.3 Million in Projects for Research, Development, and Demonstration of Alternative Vehicle Technologies December 3, 2008 - 4:58pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of six cost-shared research projects for the development and

  1. DOE Selects Five Ethanol Conversion Projects for $23 Million in Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Funding | Department of Energy Five Ethanol Conversion Projects for $23 Million in Federal Funding DOE Selects Five Ethanol Conversion Projects for $23 Million in Federal Funding March 27, 2007 - 12:10pm Addthis Projects to Develop Fermentative Organisms to Speed Ethanol Refining WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Energy Efficiency and Renewable Energy Alexander Karsner today announced just over $23 million in federal funding, subject to negotiation of

  2. DOE Selects Research Projects to Advance Solid Oxide Fuel Cell Technology |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Research Projects to Advance Solid Oxide Fuel Cell Technology DOE Selects Research Projects to Advance Solid Oxide Fuel Cell Technology July 13, 2015 - 10:00am Addthis The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected for funding 16 solid oxide fuel cell (SOFC) technology research projects. Fuel cells are a modular, efficient, and virtually pollution-free power generation technology. In Fiscal Year (FY) 2015, NETL issued two

  3. DOE Issues RFP for West Valley Demonstration Project Probabilistic Performance Assessment

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP) for the West Valley Demonstration Project Probabilistic Performance Assessment (WVDP-PPA) procurement that will provide support to the DOE, West Valley Demonstration Project, and the New York State Energy Research and Development Authority in performing a probabilistic analysis to support the Phase 2 Decision making Alternative for the West Valley Demonstration Project and Western New York Nuclear Service Center.

  4. DOE Offers Loan Guarantees to Geothermal Projects in Nevada and Oregon |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Offers Loan Guarantees to Geothermal Projects in Nevada and Oregon DOE Offers Loan Guarantees to Geothermal Projects in Nevada and Oregon June 16, 2010 - 2:19pm Addthis Photo of a geothermal power plant. DOE recently offered loan guarantees for geothermal power projects located in northwestern Nevada and southeastern Oregon, drawing on funds from the American Reinvestment and Recovery Act. Geothermal power plants generally draw on underground reservoirs of hot water or

  5. DOE Selects Three Minority-Led Projects for Funding through NETL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crosscutting Research Program | Department of Energy Three Minority-Led Projects for Funding through NETL Crosscutting Research Program DOE Selects Three Minority-Led Projects for Funding through NETL Crosscutting Research Program August 4, 2015 - 11:02am Addthis The U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected Historically Black Colleges and Universities and Other Minority Institutions (HBCUs/OMIs) projects to receive funding for fossil fuel

  6. DOE-Funded Research Projects Win 41 R&D 100 Awards for 2006 | U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) DOE-Funded Research Projects Win 41 R&D 100 Awards for 2006 News News Home Featured Articles Science Headlines 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.19.06 DOE-Funded Research Projects Win 41 R&D 100 Awards for

  7. DOE Funds 15 New Projects to Develop Solar Power Storage and Heat Transfer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects For Up to $67.6 Million | Department of Energy 15 New Projects to Develop Solar Power Storage and Heat Transfer Projects For Up to $67.6 Million DOE Funds 15 New Projects to Develop Solar Power Storage and Heat Transfer Projects For Up to $67.6 Million September 19, 2008 - 3:43pm Addthis WASHINGTON - U.S. Department of Energy (DOE) today announced selections for negotiations of award under the Funding Opportunity Announcement (FOA), Advanced Heat Transfer Fluids and Novel Thermal

  8. Integrated Project Teams Guide for Use with DOE O 413. 3A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    This Guide provides those responsible for program and project management with the information and perspective needed to successfully implement the requirements of DOE O 413.3A relating to the use of integrated project teams to achieve improved project outcomes and efficiency.

  9. DOE Awards Contract for D&D Project for ETTP

    Broader source: Energy.gov [DOE]

    DOE awards contract for the remaining environmental cleanup at ETTP to URS | CH2M Oak Ridge, LLC. The $2.2 billion contract will complete cleanup and provide support functions at ETTP.

  10. DOE-TSPP-4, Registering a Technical Standard Project - August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to DOE Technical Standards, or to register a person's or organization's intent to work with a non-Government standards body to prepare or revise a non-Government standard. ...

  11. DOE Alaska Native Village Renewable Energy Project Development Workshop

    Broader source: Energy.gov [DOE]

    Presented by the U.S. Department of Energy's (DOE's) Office of Indian Energy with support from DOE’s National Renewable Energy Laboratory, this interactive workshop will walk participants through...

  12. DOE Announces $14 Million Industry Partnership Projects to Increase...

    Office of Environmental Management (EM)

    ... DOE cost: 522,265 Industry cost share: 463,448 Integration of On-Board Idle Reduction ... International Truck and Engine Corporation in Warrenville, IL will facilitate idle ...

  13. 2015 DOE Solid-State Lighting Project Portfolio

    Broader source: Energy.gov (indexed) [DOE]

    ... used as environmental stressors in building the ALT methods. ... per year of energy and by reducing carbon emissions by ... and air pollutants such as SO2 and DOE Solid-State Lighting ...

  14. DOE Issues Environmental Assessment on Road Project for Public Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues 88th Lessons Learned Quarterly Report DOE Issues 88th Lessons Learned Quarterly Report September 1, 2016 - 2:59pm Addthis The 88th Lessons Learned Quarterly Report highlights the Council on Environmental Quality final guidance on climate change, U.S. Fish and Wildlife Service migratory bird training, an updated Environmental Protection Agency screening tool for environmental justice analysis, and contributions by our summer interns. Addthis Related Articles DOE Issues 86th Lessons Learned

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bio-oil Upgrading with Novel Low Cost Catalysts - Catalyst Development with Synergistic Evaluation This presentation does not contain any proprietary, confidential, or otherwise restricted information May 21, 2013 Bio-Oil Technology Area Review (DOE Manager: Melissa Klembara) PI: Jae-Soon Choi, Oak Ridge National Laboratory PI: Alan Zacher, Pacific Northwest National Laboratory WBS #: 3.2.2.28 & 3.2.2.29 2 Bio-oil Upgrading with Novel Low Cost Catalysts - Catalyst Development with

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bio Energy Initiative for Connecticut Date: May 23, 2013 Technology Area Review: Bioenergy Technologies Principal Investigator: Steven L. Suib Organization: The University of Connecticut This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goals of the Research 1. DOE recommends Poplar as one of the best Bioenergy Crops for the NE US and we have made Field Evaluations and Genetic Improvement of Poplar Trees. 2. Heterogeneous Catalysts have been

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (BETO) Project Peer Review Resource Analysis Project WBS 1.6.1.3 Date: May 20 th , 2013 Technology Area Review: Analysis and Sustainability Principal Investigator: Matt Langholtz Team: Laurence Eaton, Anthony Turhollow Organization: ORNL 2 Resource Analysis, BETO 2013 Peer Review Goal Statement * Provide timely and credible estimates of feedstock supplies and prices to support - the data and analysis of other projects in Analysis and Sustainability, Feedstock Supply and Logistics, Conversion,

  18. Project Status | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects, Missions, and Status High Energy Physics (HEP) HEP Home About Research Facilities User Facilities Facility Ops Projects, Missions, and Status Science Highlights Benefits of HEP Funding Opportunities Advisory Committees Community Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: Email Us More Information » Facilities Projects, Missions, and Status

  19. Projects | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plants Selected for Further Development | Department of Energy Projects Aimed at Advancing State-of-the-Art Carbon Capture from Coal Power Plants Selected for Further Development Projects Aimed at Advancing State-of-the-Art Carbon Capture from Coal Power Plants Selected for Further Development August 15, 2011 - 1:00pm Addthis Washington, DC - Four projects aimed at reducing the energy and cost penalties of advanced carbon capture systems applied to power plants have been selected for further

  20. DOE Announces $16 Million for 54 Projects to Help Commercialize...

    Office of Environmental Management (EM)

    (TCF) will support 54 projects at 12 national labs involving 52 private-sector partners. ... maturation is needed to attract a private partner; and Topic Area 2: Cooperative ...

  1. The Fuel Cell Mobile Light Project - A DOE Market Transformation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications DOEBoeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia Fuel Cell Product CertificationListing Lessons Learned Market Transformation ...

  2. DOE Project Taps HPC for Next-Generation Climate Modeling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other participating national laboratories include Argonne, Brookhaven, Lawrence Livermore, Los Alamos, Oak Ridge, Pacific Northwest and Sandia. The project, called Accelerated ...

  3. Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    The Research Support Building and Infrastructure Modernization (RSB) Project encompasses the construction of a new office building (Bldg. 052), the demolition of the aging trailers ...

  4. DOE Selects Twelve Projects for Crosscutting Technology Research...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy's National Energy Technology Laboratory (NETL) has selected 12 projects to receive funding through its Crosscutting Research Program's Transitional...

  5. DOE CD-4 Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment Document (with signatures) (pdf) Integrated Safety Management Document (pdf) Burn Test Results (pdf) Project Execution Plan (22207 Version with signatures) (pdf) Other...

  6. Geologic Carbon Dioxide Storage Field Projects Supported by DOE...

    Broader source: Energy.gov (indexed) [DOE]

    program has supported a number of projects implementing CO2 injection in the United States and other countries including, Canada, Algeria, Norway, Australia, and Germany. ...

  7. SOFC Project Information - 2016 | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Number Project Title Performer Research Focus FE0023186 Reliable SOFC Systems FuelCell Energy Inc. Atmospheric Systems FE0026093 Innovative SOFC Technologies FuelCell Energy Inc. ...

  8. DOE Selects Projects To Enhance Its Research into Recovery of...

    Broader source: Energy.gov (indexed) [DOE]

    Laboratory (NETL) has selected 10 projects to receive funding for research in support of the lab's program on Recovery of Rare Earth Elements from Coal and Coal Byproducts. ...

  9. DOE Announces Webinars on Tribal Renewable Energy Projects, Renewable...

    Broader source: Energy.gov (indexed) [DOE]

    Upcoming Webinars June 24: Live Webinar on Tribal Renewable Energy Projects Webinar Sponsor: ... such as the National Environmental Policy Act, Section 106, new leasing ...

  10. DOE project could impact local traffic in coming weeks | Y-12 National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Complex DOE project could impact ... DOE project could impact local traffic in coming weeks Posted: March 8, 2016 - 8:56am Oak Ridge, Tenn. - Beginning March 10, DOE's Oak Ridge Office of Environmental Management is conducting a project that requires large, slow-moving equipment on Highway 58 and Highway 95. Motorists transiting the area during this time should be alert for slow-moving vehicles and expect occasional delays. As part of the ongoing cleanup efforts at the East

  11. DOE Issues Draft RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Draft RFP for Idaho Cleanup Project Core December 22, 2014 - 2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement. The ICP Core procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition

  12. Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Coal Power Plants | Department of Energy Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture from Coal Power Plants Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture from Coal Power Plants July 7, 2010 - 1:00pm Addthis Washington, DC - Ten projects aimed at developing advanced technologies for capturing carbon dioxide (CO2) from coal combustion have been selected by the U.S. Department of Energy (DOE) under its Innovations for Existing Plants

  13. DOE to Invest up to $4.4 Million in Six Innovative Biofuels Projects at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Universities | Department of Energy 4.4 Million in Six Innovative Biofuels Projects at U.S. Universities DOE to Invest up to $4.4 Million in Six Innovative Biofuels Projects at U.S. Universities September 10, 2008 - 3:20pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of six advanced biofuels projects in which DOE plans to invest up to $4.4 million, subject to annual appropriations. These awards to U.S. institutions of higher education will

  14. U.S. DOE, Kazakhstan government launch aerial imaging project

    SciTech Connect (OSTI)

    Hamm, J.

    1997-10-01

    The US Department of Energy (DOE) and the Kazakhstan government have launched a breakthrough science and technology mission to use DOE technology developed to detect weapons proliferation to search for oil and mineral reserves in Kazakhstan. The Pacific Northwest National Laboratory is leading the research effort, which began in June. This mission to conduct airborne imaging flights over Kazakhstan is the result of a recently signed agreement between Pacific Northwest and Earth Search Sciences Inc., a remote sensing firm based in Idaho, to look for oil and mineral deposits in the Republic of Kazakhstan in central Asia. It is the first time this technology will be used outside the United States.

  15. DOE Selects Projects to Monitor and Evaluate Geologic CO2 Storage |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Selects Projects to Monitor and Evaluate Geologic CO2 Storage DOE Selects Projects to Monitor and Evaluate Geologic CO2 Storage August 24, 2009 - 1:00pm Addthis Washington, D.C. -- The U.S. Department of Energy (DOE) today announced the selection of 19 projects to enhance the capability to simulate, track, and evaluate the potential risks of carbon dioxide (CO2) storage in geologic formations. The projects' total value is approximately $35.8 million over four years, with

  16. DOE Selects Nine R&D Projects to Advance SSL Technology | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Selects Nine R&D Projects to Advance SSL Technology DOE Selects Nine R&D Projects to Advance SSL Technology May 4, 2015 - 9:56am Addthis The U.S. Department of Energy has announced the competitive selection of nine solid-state lighting projects to receive funding, in response to the funding opportunity announcement DE-FOA-0001171. These one- to two-year projects will focus on all three existing DOE SSL R&D program areas: Core Technology Research (the application of

  17. DOE to Invest $17.6 Million in Six Early-Stage Photovoltaic Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 17.6 Million in Six Early-Stage Photovoltaic Projects DOE to Invest $17.6 Million in Six Early-Stage Photovoltaic Projects September 29, 2008 - 2:02pm Addthis DOE announced on September 29 that it will invest $17.6 million, subject to annual appropriations, in six company-led, early-stage photovoltaic (PV) projects under the Solar America Initiative's "PV Incubator" funding opportunity. The "PV Incubator" project is designed to fund prototype PV

  18. Presentations from the 2012 DOE Project Management Workshop

    Broader source: Energy.gov [DOE]

    Please see below for copies of the presentations given at the the 2012 Department of Energy Project Management Workshop on April 3 & 4, 2012. Permission to post has not been recceived for some...

  19. Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Print Text Size: A A A FeedbackShare Page Visit LBNL's Site Construction Information page ... The Independent Project Review (IPR) has been scheduled for mid-July. Construction is ...

  20. ALARA Activities at DOE Submitting ALARA Project Descriptions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concerns: Total collective dose for the project *Pre-job collective dose estimate: person-mrem *Actual collective dose measured: person-mrem Effect on dose rates, airborne and...

  1. Moab Mill Tailings Pile 25 Percent Disposed: DOE Moab Project...

    Energy Savers [EERE]

    Donald Metzler Moab Federal Project Director (970) 257-2115 Wendee Ryan S&K Aerospace Public Affairs Manager (970) 257-2145 Grand Junction, CO - One quarter of the uranium mill ...

  2. Property:Was This Project DOE Funded? | Open Energy Information

    Open Energy Info (EERE)

    + MHK TechnologiesEvopod E35 + No + MHK TechnologiesITRI WEC + No + MHK TechnologiesOTEC + No + Retrieved from "http:en.openei.orgwindex.php?titleProperty:WasThisProject...

  3. DOE Awards First Three Large-Scale Carbon Sequestration Projects...

    Broader source: Energy.gov (indexed) [DOE]

    ... The CO2 for this project will come from a post-combustion capture facility located at a coal-fired power plant in the region. A second test will be conducted in northwestern ...

  4. DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today awarded a competitive small business task order to Navarro Research and Engineering Inc. of Oak Ridge, Tennessee. The award is a $22 million, time and materials task order with a three-year performance period and two one-year extension options.

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1.2.4 - Thermal Conversion Sustainability Interface May 20, 2013 Technology Area Review: Analysis and Sustainability PI: Lesley Snowden-Swan Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statements * Integration of BETO's Thermochemical Conversion and Sustainability Thrusts: - Incorporate sustainability considerations during design and development of emerging pathways

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fungal Genomics aka Fungal Biotechnology May 21, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Jon Magnuson Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * Our goal is enabling accelerated development of fungal bioprocesses using fungi that are industrially relevant. * Use systems biology, genetic engineering and bioreactors to

  7. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Saint Joseph's University Institute for Environmental Stewardship May 23, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Clint J. Springer* & Michael McCann Organization: Saint Joseph's University This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Establishment of an Institute of Environmental Stewardship at Saint Joseph's University in Philadelphia, PA who's mission will have a

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (BETO) Project Peer Review Biomass Derived Pyrolysis Oils Corrosion Studies May 22, 2013 Bio-Oil Technology Area Review James R Keiser Oak Ridge National Laboratory Goals/Objectives The presence of significant concentrations of oxygen-bearing compounds, including water and carboxylic acids, makes biomass derived oils very corrosive to some common structural materials The goals of this project are: 1) Use conventional and developmental techniques to fully characterize bio-oil intermediates and

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Applied Membrane Technology for Processing of Ethanol from Biomass Date: May 20-23, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Stuart Nemser, PhD Organization: Compact Membrane Systems Goal Statement * Enhance the low-cost production of bioethanol * Develop membrane system * Demonstrate drying ethanol to fuel grade * Demonstrate long term resistance 2 Quad Chart Overview Timeline * Project start date: 6/29/2006 * Project end date: 3/31/2013 * Percent complete:

  10. Current Projects | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Laboratories Infrastructure (SLI) Program » Current Projects Operations Program Management (OPM) OPM Home About Science Laboratories Infrastructure (SLI) Program Current Projects Safeguards & Security (S&S) Program Sustainability Contact Information Operations Program Management U.S. Department of Energy SC-33/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-8429 F: (301) 903-7047 More Information » Science Laboratories Infrastructure (SLI)

  11. EERE Success Story-DOE-Funded Project is First Permanent Facility...

    Energy Savers [EERE]

    Resources at an Oil and Gas Well EERE Success Story-DOE-Funded Project is First Permanent Facility to Co-produce Electricity from Geothermal Resources at an Oil and Gas Well May ...

  12. DOE Project 18545, AOP Task 2.0B, CRADA with Reaction Design...

    Office of Scientific and Technical Information (OSTI)

    Task 2.0B, CRADA with Reaction Design Citation Details In-Document Search Title: DOE Project 18545, AOP Task 2.0B, CRADA with Reaction Design You are accessing a document from ...

  13. DOE Project 18545, AOP Task 2.0B, CRADA with Reaction Design...

    Office of Scientific and Technical Information (OSTI)

    Task 2.0B, CRADA with Reaction Design Citation Details In-Document Search Title: DOE Project 18545, AOP Task 2.0B, CRADA with Reaction Design We ran 5 FACE fuels and 8 surrogate ...

  14. Solid-State Lighting Patents Resulting from DOE-Funded Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SOLID-STATE LIGHTING BUILDING TECHNOLOGIES OFFICE Solid-State Lighting Patents Resulting from DOE-Funded Projects As of January 2015, 96 solid-state lighting (SSL) patents have ...

  15. Solid-State Lighting Patents Resulting from DOE-Funded Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solid-State Lighting Patents Resulting from DOE-Funded Projects Patents Factsheet January 2016 (798.8 KB) More Documents & Publications Solid-State Lighting Patents Resulting from ...

  16. DOE Moab Project Safely Removes 7 Million Tons of Mill Tailings

    Broader source: Energy.gov [DOE]

    (Grand Junction, CO) ― The U.S. Department of Energy (DOE) has safely moved another million tons of uranium mill tailings from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project.

  17. DOE Announces $16 Million for 54 Projects to Help Commercialize Promising

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Technologies: Technology Commercialization Fund Will Support 12 National Labs and 58 Private Sector Partners | Department of Energy DOE Announces $16 Million for 54 Projects to Help Commercialize Promising Energy Technologies: Technology Commercialization Fund Will Support 12 National Labs and 58 Private Sector Partners DOE Announces $16 Million for 54 Projects to Help Commercialize Promising Energy Technologies: Technology Commercialization Fund Will Support 12 National Labs and 58

  18. DOE Selects Projects for up to $50 Million of Federal Funding to Modernize

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Nation's Electricity Grid | Department of Energy up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid DOE Selects Projects for up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid April 21, 2008 - 10:49am Addthis Demonstration Projects Aim at 15 Percent Reduction of U.S. Peak Load Electricity Demand Washington, DC- U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin Kolevar today

  19. DOE Awards Contract for the West Valley Demonstration Project Probabilistic Performance Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati – The U.S. Department of Energy (DOE) today announced the award of a contract to Neptune and Company, Inc. for the WVDP-PPA procurement that will provide support to the U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), and the New York State Energy Research and Development Authority (NYSERDA) in performing a probabilistic analysis to support the Phase 2 Decision making Alternative for the West Valley Demonstration Project and Western New York Nuclear Service Center.

  20. DOE Regional Tribal Energy Project Development and Finance Workshops to be

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Held this Summer | Department of Energy Regional Tribal Energy Project Development and Finance Workshops to be Held this Summer DOE Regional Tribal Energy Project Development and Finance Workshops to be Held this Summer June 17, 2014 - 1:14pm Addthis The U.S. Department of Energy (DOE) Office of Indian Energy and the Tribal Energy Program, with support from the National Renewable Energy Laboratory (NREL), are hosting a series of interactive workshops this summer that will walk participants

  1. NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office ACTION: Finding of No Significant Impact (FONSI); Paducah Gaseous Diffusion Plant Environmental Assessment (EA) for Potential Land and Facilities Transfers, McCracken County, Kentucky DATE: l)SUMMARY: The Proposed Action is to transfer DOE real property at the Paducah Gaseous Diffusion Plant (PGDP) site to one or more entities for a use that is different from its current use. DOE's Paducah Gaseous Diffusion Plant

  2. DOE Humanities Projects Announced | U.S. DOE Office of Science...

    Office of Science (SC) Website

    ... NERSC Featured Story External link External link Guidelines for applying and additional information on the NEH Web Site External link Perseus Digital Library Project: http:...

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9.3.2.1 Whole Algae Liquefaction Model Development DATE MAY 22, 2013 TECHNOLOGY AREA REVIEW: ALGAE DAN ANDERSON RICH HALLEN, SUE JONES, DOUG ELLIOTT PACIFIC NORTHWEST NATIONAL LABORATORY This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Develop sufficient data to formulate a robust and detailed techno- economic model of the whole algae hydrothermal liquefaction (HTL) process In addition to HTL, this process application includes:

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    11.2.2.2 Opportunities for Biomass- Base Fuels and Products to Address the Entire Barrel of Oil in a Refinery May 20, 2013 Technology Area Review: Analysis and Sustainability Principal Investigators: Sue Jones, Charlie Freeman Organization: Pacific Northwest National Laboratory PNNL-SA-95231 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * The goal of the analysis to address

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Short Rotation Woody Biomass Sustainability May 23 rd , 2013 Analysis and Sustainability Matthew H. Langholtz, Natalie A. Griffiths Oak Ridge National Laboratory C. Rhett Jackson, University of Georgia Jeffrey J. McDonnell, University of Saskatchewan John I. Blake, USDA Forest Service This presentation does not contain any proprietary, confidential, or otherwise restricted information *2 Managed by UT-Battelle for the U.S. Department of Energy *ORNL - Bioenergy Resource and Engineering Systems

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Date: May 21 st 2013 Technology Area Review: Analysis & Sust. Principal Investigator: Paul N. Leiby Co-Investigators: Rocio Uria-Martinez and Maxwell Brown Organization: Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Biofuels National Strategic Benefits Analysis *2 Managed by UT-Battelle for the U.S. Department of Energy *Presentation_name Biofuels National Strategic Benefit Analysis: Goals Statement Advance

  7. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1.1.1.2 Sustainable Feedstock Production- Logistics Interface May 23, 2013 Sustainability and Analysis Platform David J Muth Jr, PhD Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov * Develop integrated biomass production system designs that: - Increase total productivity of the landscape - Decrease delivered feedstock cost - Increase production system environmental

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biomass Production and Nitrogen Recovery Date: May 23, 2013 Technology Area Review: Sustainability Principal Investigator: M. Cristina Negri Organization: Argonne National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement To determine the feasibility , productivity and sustainability of a biomass landscape production scenario and BMP that by design introduce positive land use change and water quality benefits at the

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Title: Algae Resource Assessment May 20, 2013 Technology Area Review: Analysis & Sustainability Principal Investigator: Mark Wigmosta Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement BETO launched an initiative to obtain consistent quantitative metrics for algal biofuel production in order to establish an "integrated baseline" production scenario

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long Term Processing using Integrated Hydropyrolysis plus Hydroconversion (IH 2 ) for Production of Gasoline and Diesel from Biomass May 23, 2012 Bio-Oil Technology Area Review Terry Marker GTI This presentation does not contain any proprietary, confidential, or otherwise restricted information Big Picture Goals and Objectives * Demonstrate a new game changing technology, IH 2 , in a continuous pilot plant which - Solves the current technical and economic issues for biomass conversion to

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Liquefaction Aqueous Phase Utilization: Characterization, Upgrading, and Steam Reforming May 21, 2013 Technology Area Review: Bio-Oil Technology Karl Albrecht, Robert Dagle, Daniel Howe, Mark Gerber Organization: PNNL PNNL-SA-95131 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * GOAL: Increase carbon yield to liquid fuels and diminish hydrogen upgrading requirements by

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production and Upgrading of Infrastructure Compatible Bio-Oil 3.2.2.26 May 21, 2013 Technology Area Review: Bio-Oil Principal Investigators: Doug Elliott and Iva Tews Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal: Validate, in collaboration with an international process technology leader, an integrated conversion process for biomass to gasoline, diesel, or jet fuel by

  13. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IEA Task 34 Fast Pyrolysis 6.3.2.25 May 21, 2013 Technology Area Review: Bio-oil Principal Investigator: Doug Elliott Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objective Statement * The ultimate objective of IEA Bioenergy Task 34 is to promote commercialization of economical biomass fast pyrolysis for the production of refinery feedstock and fuel oil with

  14. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bio-Oil Separation and Stabilization by SCF Fractionation - 3.3.1.19 May 23, 2013 Bio-Oil Technology Area Review Daniel M. Ginosar, Ph.D, Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goals and Objectives * Stabilize algae based pyrolysis and hydrothermal liquefaction oils by separating them into similar polarity groups using energy efficient supercritical fluid fractionation * Bio-Oil Stabilization and

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3.2.2.31-Improved Hydrothermal Liquefaction Bio-Oil Production May 23, 2013 Technology Area Review: Bio-Oil Technology Area Principal Investigators: Richard Hallen and Tanner Schaub Organizations: PNNL/NMSU Presented by: Karl O. Albrecht This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objective Statement * Develop a detailed understanding of the effect of key process parameters impacting

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3.6.1.1, 3.6.1.3 Thermochemical Platform Analysis: Ex-Situ and In-Situ TEAs (No Evaluation) May 22, 2013 Technology Area Review: Bio-Oils Abhijit Dutta, Sue Jones Organizations: National Renewable Energy Laboratory, Pacific Northwest National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement  Enable technologies for improvement of the quality of vapors from the fast

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development of Bio-Oil Commodity Fuel as a Refinery Feedstock from High Impact Algae Biomass May 23 rd , 2013 Bio-Oil Technology Area Review James R. Kastner BioChemical Engineering The University of Georgia This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement * Convert wet algae to liquid hydrocarbons * Generate a refinery grade, low N bio-oil feedstock from algae * Co-process algal oil with an intermediate refinery

  18. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Home Heating Oil for the Northeast May 21, 2013 Technology Area Review: Bio-oil Principal Investigators: Thomas Butcher, Richard Boardman, Corrie Nichols, James Keiser, Jonathan Male, Corinne Valkenburg, Susanne Jones, Jacob Jacobson Organization: BNL, INL, ORNL, PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objectives Statement The Goal Statement * Evaluate the options

  19. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CATALYTIC DEOXYGENATION OF PYROLYSIS OILS 20 May 2013 Technology Area Review: Bio-Oil and Upgrading Principal Investigator: Corinne Valkenburg Co-PI: Mariefel V. Olarte Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Reduce the costs associated with catalytic upgrading of pyrolysis oil by - Increasing liquid fuel yield by improving carbon utilization - Improving H 2

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6.5.2.2 U.S.-China collaboration- Thermochemical Conversion of Biomass May 21 th , 2013 Technology Area Review: Bio-oil Principal Investigators: Jonathan Male, Huamin Wang Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * GOAL: Combine and leverage U.S. and Chinese expertise to evaluate, develop, and enable commercially viable processes in thermochemical

  1. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermochemical Feedstock Interface Tyler Westover/David Muth, Idaho National Laboratory Daniel Howe, Pacific Northwest National Laboratory Daniel Carpenter, National Renewable Energy Laboratory May 21, 2013 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement Goals: (1). Develop models & tools to evaluate feedstock costs & quality for TC processes (pyrolysis, gasification,

  2. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conversion to Liquid Hydrocarbons from Pyrolysis Oil and Syngas May 20, 2013 Bio-Oil Technology Area Review Fei Yu and Philip H. Steele Sustainable Energy Research Center (SERC) Mississippi State University (MSU) This presentation does not contain any proprietary, confidential, or otherwise restricted information *On many slides, the slide notes section has important additional information* Goal/Objective Statement * MSU pyrolysis/syngas program goals: - Develop hydrocarbon and biodiesel fuels

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BC Process Improvements Validation Task (2.3.1.7) Date: May 21, 2013 Technology Area Review: Biochemical Conversion Principal Investigators: James D. (Jim) McMillan and Nancy Dowe Organization: NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. BC Process Improvements

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agricultural Residues May 20, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigators: Douglas L. Karlen & David J. Muth Jr. Organization: Sun Grant Regional Partnership/USDA-ARS/INL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement  Implement field trials quantifying short- and long- term effects of harvesting agricultural residues (i.e., corn stover and wheat straw)  Develop methodologies

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regional Feedstock Partnership: Woody Crops May 21, 2013 Feedstock Supply & Logistics Bill Berguson, Poplar Team Lead Univ. of Minnesota-NRRI Mark Downing, DOE-BETO Coordinator Oak Ridge National Laboratory Tim Rials, SGA Coordinator The University of Tennessee Tim Volk, Willow Team Lead State University of New York - ESF Goal Statement The Woody Crop's Goal *Address knowledge gaps limiting the deployment of woody resources as an economically viable feedstock for fuels and energy production

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Feedstock Preprocessing User Facility Date: Thursday, May 23, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Neal A. Yancey Organization: Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Energy Efficiency & Renewable Energy eere.energy.gov 2 Provide "at scale" an innovative tool to use technology transfer capabilities to demonstrate BETO Fundamentals and

  7. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrothermal Decomposition & Resource Recycling Date: May 21 st , 2013 Technology Area Review: BETO Principal Investigator: City of Allentown & Delta Thermo Energy Organization: City of Allentown This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Research & design an innovative solution using "Hydrothermal Decomposition" technology to transform municipal solid waste, biomass, biosolids waste into a

  8. HALLIBURTON SPERRY-SUN DOE HIGH TEMPERATURE LWD PROJECT

    SciTech Connect (OSTI)

    Ronald L. Spross

    2005-03-15

    The objective of this project was to build a high temperature, cost-effective, logging while drilling (HT-LWD) system with the ability to operate at 175 C with more than 100 hours mean time between failures (MTBF). Such a commercial real-time formation evaluation (FE) system would help operators to drill and produce hydrocarbon resources from moderately deep, hot reservoirs which otherwise might be uneconomic to drill. The project plan was to combine the existing Sperry-Sun high temperature directional and gamma logging system with lower temperature FE sensors which were upgraded to higher temperature operation as part of the project. The project was to be completed in two phases. Phase I included the development of the HT system, building two complete systems, demonstrating operational capability at 175 C and survivability at 200 C in the laboratory, and successfully testing the system in two low temperature field tests. Phase II was to test the system in a well with a bottom hole temperature of 175 C. The high temperature FE sensors developed as part of this project include gamma ray (DGR), resistivity (EWR-Phase 4), neutron (CTN), and density (SLD). The existing high temperature pulser and telemetry system was upgraded to accommodate the data and bandwidth requirements of the additional sensors. Environmental and lifetime testing of system components and modules indicates that system life and reliability goals will be substantially exceeded. The system has performed well in domestic and international high temperature wells (to 175 C). In addition to the sensor modules specified in the project contract, Sperry has now upgraded other system components to higher temperature as well. These include a LWD sonic sensor (BAT), pressure while drilling sensor (PWD), and a more powerful central system controller (CIM).

  9. DOE O 413.3A Change 1 - Program and Project Management for the Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Capital Assets | Department of Energy A Change 1 - Program and Project Management for the Acquisition of Capital Assets DOE O 413.3A Change 1 - Program and Project Management for the Acquisition of Capital Assets PF2009-10.pdf (383.55 KB) More Documents & Publications Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Issue a New Department of Energy Acquisition Guide Chapter 6.5 Competition Advocate

  10. DOE-Funded Research Projects Win 46 R&D 100 Awards for 2009 | U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Research Projects Win 46 R&D 100 Awards for 2009 DOE-Funded Research Projects Win 46 R&D 100 Awards for 2009 July 24, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Secretary of Energy Steven Chu announced today that Energy Department-funded researchers have won 46 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted awards are presented annually in recognition of exceptional

  11. DRAFT - DOE G 413.3-15, Department of Energy Guide for Project Execution Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  12. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    SciTech Connect (OSTI)

    Ruby, D.S.

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  13. The DOE Solar Thermal Electric Program Concentrator Technology Project

    SciTech Connect (OSTI)

    Mancini, T.R.

    1991-01-01

    The project comprises the development of concentrating solar collectors, heliostats and dishes, and the development of optical materials. Because the solar concentrator represents from 40 to 60% of the cost of a solar thermal electric system, the continued development of high-performance concentrators is very important to the commercial viability of these systems. The project is currently testing two large area heliostats, the SPECO 200 m{sup 2} heliostat and the ATS 150 m{sup 2} heliostat and also trying to reduce the cost of the heliostats through the development of stretched-membrane heliostats. Stretched-membrane heliostats are made by attaching thin metal membranes to the two sides of a circular, metal ring. A slight vacuum in the plenum between the two membranes is used to focus the heliostat. The optical surface is provided by a silver-acrylic film, ECP 305. A prototype 100 m{sup 2} commercial unit has been built and is currently being tested. Parabolic dish concentrators are under development for use on dish-Stirling electric systems. The state-of-the-art dish is the McDAC/SCE faceted glass concentrator. Because of the success of stretched-membrane technology for heliostats, the project applied the technology to parabolic dish development and is currently designing a near-term, faceted, stretched-membrane dish. The current thrust of the program in optical materials development is the development of a low-cost, high-performance, silver-acrylic film. 3M's ECP 305 has demonstrated substantial improvement over previous films in its resistance to corrosion, longer life. An experimental film, developed at SERI, has promise for further improving the lifetime of the ECP 305. The project is currently investigating solutions to the problem of separation between the silver and acrylic layers of the film in the presence of water.

  14. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Deployment of a Short Rotation Woody Crops Harvesting System Based on a Case New Holland Forage Harvester and SRC Woody Crop Header Date: May 22, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Timothy A. Volk Organization: SUNY-ESF Project Partners Goal Statement Develop, test and deploy a single pass cut and chip harvester combined with a handling, transportation and storage system that is effective and efficient in a range of different short rotation

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enerkem NREL CRADA May 21, 2013 Esteban Chornet 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement The goals of this joint CRADA project are: * Develop the use of carbon dioxide (CO 2 ) in catalytic reforming and carbon gasification to increase yields and carbon conversion efficiency * Further develop and improve catalytic carbonylation of biomass derived syngas for carbon-carbon bond formation for the production of fuels and platform chemicals * Provide comprehensive catalysts and

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NC A&T Renewable Energy Center -Production of High-Quality Syngas via Biomass Gasification for Catalytic Synthesis of Liquid Fuels and Combined Heat and Power Generation May 21st 2013 Technology Area Review: Biomass Gasification Ghasem Shahbazi and Lijun Wang Biological Engineering North Carolina Agricultural and Technical State University Goal Statement The major goal of this project is to develop an efficient gasification system in order to convert woody biomass and agricultural residue

  17. Notice of Intent to Develop DOE G 415.1-1, Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06

    The proposed guide will support consistent and effective implementation of DOE O 415.1 and will assist IT Program and Project Managers in effectively managing and applying sound project management to IT projects subject to that order.

  18. DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AGENDA DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting February 8-9, 2005 Argonne National Laboratory February 8, 2005 7:30 Arrival and breakfast 8:30 Overview Presentations DOE Hydrogen Program Mark Paster, DOE/OHFCIT Overview of FreedomCAR & Fuels Partnership/DOE Delivery Program George Parks, ConocoPhillips 10:00 BREAK 10:15 High-Pressure Tube Trailers and Tanks Salvadore Aceves, Lawrence Livermore National Laboratory 11:15 High-Pressure Hydrogen

  19. DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Agenda | Department of Energy Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda, held February 8-9, 2005 by Argonne National Laboratory pipeline_agenda.pdf (102.72 KB) More Documents & Publications Meeting Agenda Joint Meeting on Hydrogen Delivery Modeling and

  20. DOE Selects 13 Solar Energy Projects for up to $168 Million in Funding |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 13 Solar Energy Projects for up to $168 Million in Funding DOE Selects 13 Solar Energy Projects for up to $168 Million in Funding March 8, 2007 - 10:28am Addthis First funding awards for Solar America Initiative to make solar technology cost-competitive by 2015 LOWELL, MA - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the selection of 13 industry-led solar technology development projects for negotiation for up to $168 million (FY'07-'09) in

  1. Los Alamos among new DOE projects to create new technology pathways for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    low-cost fusion energy development New DOE projects for low-cost fusion energy development Los Alamos among new DOE projects to create new technology pathways for low-cost fusion energy development Three of the projects involve Los Alamos National Laboratory science staff and partners. July 20, 2015 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from

  2. DOE Selects Eight Projects to Receive Funding for Reducing the Cost of CO2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capture and Compression | Department of Energy Eight Projects to Receive Funding for Reducing the Cost of CO2 Capture and Compression DOE Selects Eight Projects to Receive Funding for Reducing the Cost of CO2 Capture and Compression September 1, 2015 - 10:03am Addthis The U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) has selected eight projects to receive funding to construct small- and large-scale pilots for reducing the cost of carbon dioxide (CO2) capture

  3. DOE Selects 3 Small-Scale Biorefinery Projects for up to $86 Million of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Funding in Maine, Tennessee and Kentucky | Department of Energy 3 Small-Scale Biorefinery Projects for up to $86 Million of Federal Funding in Maine, Tennessee and Kentucky DOE Selects 3 Small-Scale Biorefinery Projects for up to $86 Million of Federal Funding in Maine, Tennessee and Kentucky April 18, 2008 - 10:49am Addthis Projects Demonstrate Continued Commitment to Advancing Development of Sustainable, Cost-Competitive Cellulosic Ethanol ALEXANDRIA, VA. - U.S. Department of

  4. DOE Bioenergy Technologies Office - IBR Project Peer Review May 22, 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Bioenergy Technologies Office - IBR Project Peer Review May 22, 2013 Ed Legere, Executive Vice President, Founder and Principle Investigator VW @ Cyano Biofuels, May 02, 2012, Berlin - Algenol, Dirk Radzinski Project Description Algenol Biofuels 2 VW @ Cyano Biofuels, May 02, 2012, Berlin - Algenol, Dirk Radzinski Algenol IBR Project Description * Location: Southwest Florida Coast * IBR - Fort Myers, FL * Company Headquarters - Bonita Springs, FL * Feedstocks * CO2 - Purchased from local

  5. DOE and USDA Select Projects for more than $24 Million in Biomass Research

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Development Grants | Department of Energy Select Projects for more than $24 Million in Biomass Research and Development Grants DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants November 12, 2009 - 12:00am Addthis Washington, DC - The U.S. Departments of Agriculture and Energy today announced projects selected for more than $24 million in grants to research and develop technologies to produce biofuels, bioenergy and high-value biobased

  6. Bethune-Cookman University STEM Research Lab. DOE Renovation Project

    SciTech Connect (OSTI)

    Thompson, Herbert W.

    2012-03-31

    DOE funding was used to renovate 4,500 square feet of aging laboratories and classrooms that support science, engineering, and mathematics disciplines (specifically environmental science, and computer engineering). The expansion of the labs was needed to support robotics and environmental science research, and to better accommodate a wide variety of teaching situations. The renovated space includes a robotics laboratory, two multi-use labs, safe spaces for the storage of instrumentation, modern ventilation equipment, and other “smart” learning venues. The renovated areas feature technologies that are environmentally friendly with reduced energy costs. A campus showcase, the laboratories are a reflection of the University’s commitment to the environment and research as a tool for teaching. As anticipated, the labs facilitate the exploration of emerging technologies that are compatible with local and regional economic plans.

  7. DOE - Office of Legacy Management -- Dayton Project Unit 6 - Scioto

    Office of Legacy Management (LM)

    Laboratory - OH 45A Unit 6 - Scioto Laboratory - OH 45A FUSRAP Considered Sites Site: Dayton Project (Unit 6) - Scioto Laboratory (OH.45A) No further action determination pending Designated Name: Not Designated Alternate Name: Scioto Laboratory Scioto Ordnance Plant Dayton Unit VI EPA Potential Release Site (PRS -325) OH.45A-1 OH.45A-2 OH.45A-3 OH.45A-4 Location: North of Harding Highway (Route 309) at County Route 98, Marion County, Marion, Ohio OH.45A-2 Evaluation Year: Circa 1987 Site

  8. DOE Selects Ten Projects to Conduct Advanced Turbine Technology Research

    Broader source: Energy.gov [DOE]

    Ten university projects to conduct advanced turbine technology research under the Office of Fossil Energy’s University Turbine Systems Research Program have been selected by the U.S. Department of Energy for additional development. Developing gas turbines that run with greater cleanness and efficiency than current models is of great benefit both to the environment and the power industry, but development of such advanced turbine systems requires significant advances in high-temperature materials science, an understanding of combustion phenomena, and development of innovative cooling techniques to maintain integrity of turbine components.

  9. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    SciTech Connect (OSTI)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

  10. Notice of Intent to Develop DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium IT Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-21

    The proposed DOE G 415.1-2 will support consistent and effective implementation of DOE O 415.1 and will assist IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size.

  11. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    SciTech Connect (OSTI)

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the

  12. DOE`s approach to groundwater compliance on the UMTRA project

    SciTech Connect (OSTI)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  13. DOE Announces Nearly $14 Million to go to 28 New Wind Energy Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4 Million to go to 28 New Wind Energy Projects DOE Announces Nearly $14 Million to go to 28 New Wind Energy Projects July 16, 2009 - 12:00am Addthis WASHINGTON - U.S. Department of Energy Secretary Steven Chu today announced the selection of 28 new wind energy projects for up to $13.8 million in funding - including $12.8 million in Recovery Act funds. These projects will help address market and deployment challenges including wind turbine research and testing and

  14. DOE/EA-1976 FINDING OF NO SIGNIFICANT IMPACT FOR PROPOSED CNG PROJECT REGARDING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/EA-1976 FINDING OF NO SIGNIFICANT IMPACT FOR PROPOSED CNG PROJECT REGARDING EMERA CNG, LLC APPLICATION SEEKING DEPARTMENT OF ENERGY AUTHORIZATION TO EXPORT COMPRESSED NATURAL GAS TO NON-FREE TRADE AGREEMENT NATIONS AGENCY: U.S. Department of Energy, Office of Fossil Energy ACTION: Finding of No Significant Impact SUMMARY: The U.S. Department of Energy (DOE) prepared an environmental assessment (EA) to evaluate the potential environmental impacts associated with the construction and operation

  15. DOE Selects Projects to Develop Sensors and Controls for Next-Generation

    Energy Savers [EERE]

    STGWG Group The State and Tribal Government Working Group (STGWG) is one of the intergovernmental organizations with which the DOE EM office works with. They meet twice yearly for updates to the EM projects. They were formed in 1989. It is comprised of several state legislators and tribal staff and leadership from states in proximity to DOE's environmental cleanup sites of the following states: New York, South Carolina, Ohio, Washington, New Mexico, Idaho, California, Colorado, Georgia,

  16. DOE Office of Indian Energy Renewable Energy Project Development: Advanced Financing Concepts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concepts Why It Makes Sense to Bring on a Third-Party Partner Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Concepts for Financing Renewable Energy Projects on Tribal Lands - Levelized Cost of Energy (LCOE) - Business Structures - Tax-Equity Partnerships - Introduction  Additional Information and Resources 2 Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes

  17. DOE Office of Indian Energy Tribal Renewable Energy Project Development and Financing Essentials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Project Development and Financing Essentials Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in Indian Country. 2 About the Speaker Elizabeth Doris * Senior

  18. The Fuel Cell Mobile Light Project - A DOE Market Transformation Activity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Mobile Light Project -- A DOE Market Transformation Activity-- Lennie Klebanoff Sandia National Laboratories Chris Radley Altergy Systems Torsten Erbel Multiquip Inc. DOE Fuel Cell Technologies Webinar November 13, 2012 "Exceptional Service in the National Interest" 1 Boeing Interested in Bringing Fuel Cell Technology to Ground Support Equipment (GSE) 3/1/2008: "We (Boeing) would like Sandia to lead an effort with us to bring hydrogen fuel cell technology to airport

  19. DOE Funded Research Projects Win 31 R D 100 Awards for 2007 October 18 2007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | U.S. DOE Office of Science (SC) Funded Research Projects Win 31 R D 100 Awards for 2007 October 18 2007 News News Home Featured Articles Science Headlines 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.18.07 DOE Funded Research Projects Win 31 R D 100

  20. Seneca Nation of Indians Leverages DOE Support for Wind Turbine Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Seneca Nation of Indians Leverages DOE Support for Wind Turbine Project Seneca Nation of Indians Leverages DOE Support for Wind Turbine Project April 28, 2016 - 11:19am Addthis Office of Indian Energy Chris Deschene (third from the right) was among those in attendance at a groundbreaking ceremony the Seneca Nation of Indians held for its 1.5-MW wind turbine on April 27. Photo by Ken Parker, Food Is Our Medicine. Office of Indian Energy Chris Deschene (third from the

  1. DOE Announces $30 Million for Plug-in Hybrid Electric Vehicle Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy for Plug-in Hybrid Electric Vehicle Projects DOE Announces $30 Million for Plug-in Hybrid Electric Vehicle Projects June 12, 2008 - 1:30pm Addthis Adds Plug-in Hybrid Vehicle to Department's Fleet WASHINGTON - U.S. Department of Energy (DOE) Assistant Secretary of Energy Efficiency and Renewable Energy Andy Karsner today announced up to $30 million in funding over three years for three cost-shared Plug-in Hybrid Electric Vehicles (PHEVs) demonstration and development

  2. DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the

  3. DOE Funded Research Projects Win 30 R&D Awards for 2008 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Funded Research Projects Win 30 R&D Awards for 2008 DOE Funded Research Projects Win 30 R&D Awards for 2008 June 22, 2008 - 2:15pm Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman announced today that researchers from the U.S. Department of Energy's (DOE) National Laboratories and Y-12 National Security Complex have won 30 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial

  4. DOE Selects Projects to Develop Pre-Combustion Carbon Capture Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Coal-Based Gasification Plants | Department of Energy to Develop Pre-Combustion Carbon Capture Technologies for Coal-Based Gasification Plants DOE Selects Projects to Develop Pre-Combustion Carbon Capture Technologies for Coal-Based Gasification Plants June 11, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) today announced the selection of nine projects that will develop pre-combustion carbon capture technologies that can reduce CO2 emissions in future

  5. DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    News Media Contact(s): For Immediate Release (202) 586-4940 November 12, 2009 DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants Washington, DC - The U.S. Departments of Agriculture and Energy today announced projects selected for more than $24 million in grants to research and develop technologies to produce biofuels, bioenergy and high-value biobased products. Of the $24.4 million announced today, DOE plans to invest up to $4.9 million with USDA

  6. DOE awards contract to small business for mercury project at Y-12 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy awards contract to small business for mercury project at Y-12 DOE awards contract to small business for mercury project at Y-12 February 28, 2014 - 12:00pm Addthis OAK RIDGE, Tenn. - On Feb. 26, the U.S. Department of Energy's (DOE) Oak Ridge Office of Environmental Management (EM) awarded a task order to Strata-G, a Knoxville-based small business, to collect data and perform characterization at Outfall 200, the proposed site for the mercury water treatment facility at

  7. Advanced Seismic Data Analysis Program (The Hot Pot Project), DOE Award:

    Office of Scientific and Technical Information (OSTI)

    DE-EE0002839, Phase 1 Report (Technical Report) | SciTech Connect Advanced Seismic Data Analysis Program (The Hot Pot Project), DOE Award: DE-EE0002839, Phase 1 Report Citation Details In-Document Search Title: Advanced Seismic Data Analysis Program (The Hot Pot Project), DOE Award: DE-EE0002839, Phase 1 Report A five-line (23 mile) reflection- seismic survey was conducted at the Hot Pot geothermal prospect area in north-central Nevada under the USDOE (United States Department of Energy)

  8. DOE Zero Energy Ready Home Case Study: Shore Road Project - Old Greenwich,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecticut | Department of Energy Shore Road Project - Old Greenwich, Connecticut DOE Zero Energy Ready Home Case Study: Shore Road Project - Old Greenwich, Connecticut Case study of a DOE Zero Energy Ready Home in Old Greenwich, CT, that scored HERS 40 without PV and HERS 27 with PV. This 4,100 ft2 custom home has 13-inch ICF basement walls and 11-inch insulated concrete form (ICF) above-grade walls with a closed-cell spray foam-insulated roof deck, and a continuously running energy

  9. DOE National Laboratory Research Projects Win 31 R&D 100 Awards for 2007 |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) DOE National Laboratory Research Projects Win 31 R&D 100 Awards for 2007 News News Home Featured Articles Science Headlines 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.19.07 DOE National Laboratory Research

  10. USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production and Spur Economic Impact | Department of Energy 10 Research Projects to Accelerate Bioenergy Crop Production and Spur Economic Impact USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop Production and Spur Economic Impact August 11, 2011 - 3:55pm Addthis WASHINGTON, DC -- The U.S. Departments of Energy and Agriculture have awarded 10 grants totaling $12.2 million to spur research into improving the efficiency and cost-effectiveness of growing biofuel and bioenergy

  11. DOE Announces $27 Million to Reduce Costs of Solar Energy Projects,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Streamline Permitting and Installations | Department of Energy 7 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations June 1, 2011 - 12:00am Addthis WASHINGTON, DC - As part of the Obama Administration's SunShot Initiative to make solar energy cost-competitive with fossil fuels within the decade, U.S. Department of Energy Secretary Steven Chu today

  12. DOE Funds 21 Research, Development and Demonstration Projects for up to $78

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Million to Promote Enhanced Geothermal Systems | Department of Energy 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems October 6, 2008 - 4:14pm Addthis RENO, Nev. - Today at the National Geothermal Conference in Reno, Nev., Deputy Assistant Secretary for Renewable Energy Steve Chalk announced the U.S.

  13. DOE Funds 21 Research, Development and Demonstration Projects for up to $78

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Million to Promote Enhanced Geothermal Systems | Department of Energy Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems October 6, 2008 - 4:29pm Addthis RENO, Nev. - Today at the National Geothermal Conference in Reno, Nev., Deputy Assistant Secretary for Renewable Energy Steve Chalk announced the U.S.

  14. DOE Announces Webinars on Getting Buy-In for Energy Efficiency Projects and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Bioenergy Knowledge Discovery Framework | Department of Energy Getting Buy-In for Energy Efficiency Projects and the Bioenergy Knowledge Discovery Framework DOE Announces Webinars on Getting Buy-In for Energy Efficiency Projects and the Bioenergy Knowledge Discovery Framework September 26, 2013 - 9:51am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce.

  15. DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Production While Enhancing Environmental Protection | Department of Energy Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection August 1, 2011 - 1:00pm Addthis Washington, DC - A total of 11 research projects that will help find ways to extract more energy from unconventional oil and gas resources

  16. DOE and USDA Select Projects for more than $24 Million in Biomass Research

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Development Grants | Department of Energy and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants The U.S. Departments of Agriculture and Energy today announcedprojects selected for more than $24 million in grants to research and develop technologiesto produce biofuels, bioenergy and high-value biobased products. joint_solicitation_2009_dl.pdf (89.64 KB)

  17. DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Three Sites | Department of Energy Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been

  18. 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site

    Broader source: Energy.gov [DOE]

    (Grand Junction, CO) ― Today, the Department of Energy (DOE) announced that 6 million tons of uranium mill tailings have been shipped from Moab, Utah, under the Uranium Mill Tailings Remedial Action Project to an engineered disposal cell near Crescent Junction, Utah.

  19. DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a contract to Enviro Compliance Solutions Inc. of Tustin, California to perform environmental sampling, monitoring services and analysis of ongoing cleanup activities being performed at the West Valley Demonstration Project in western New York.

  20. DOE Seeks Projects to Advance Carbon Dioxide Utilization from Coal-Fired Power Plants

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has announced approximately $6.7 million in federal funding for cost-shared projects that will develop technologies that utilize carbon dioxide (CO2) from coal-fired power plants to produce useful products.

  1. DOE to Host Three Alaska Native Village Renewable Energy Project Development Workshops in March

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy is offering a series of regional interactive workshops designed to provide Alaska Native leaders and their staffs with the information and guidance needed to navigate the complexities of developing and implementing energy projects.

  2. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    SciTech Connect (OSTI)

    White, T.; Contos, L.; Adams, L. )

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  3. DOE names Bechtel BWXT Idaho and the Advanced Mixed Waste Treatment Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as a VPP Star Site names Bechtel BWXT Idaho and the Advanced Mixed Waste Treatment Project as a VPP Star Site Rick Provencher of DOE-ID, Jeff Mousseau of BBWI and co-safety chairs Tracy Anderson and Josh Wallace raise the VPP flag indicating the Advanced Mixed Waste Treatment Project is a Star site. View larger image here. The U.S. Department of Energy today announced it has recognized Bechtel BWXT Idaho at the Advanced Mixed Waste Treatment Project as a Star site in its Voluntary Protection

  4. DOE Selects Biofuels Projects to Receive up to $21 Million in Funding |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Biofuels Projects to Receive up to $21 Million in Funding DOE Selects Biofuels Projects to Receive up to $21 Million in Funding August 31, 2009 - 12:00am Addthis WASHINGTON, DC- U.S. Department of Energy Secretary Steven Chu announced today that up to $21 million will be made available for the selection of five projects that will develop supply systems to handle and deliver high tonnage biomass feedstocks for cellulosic biofuels production. The awards announced today are

  5. DOE extends the Idaho Cleanup Project Contract for Three Years | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract

  6. DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology Water

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Projects | Department of Energy Up to $7.3 Million for R&D Clean Technology Water Power Projects DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology Water Power Projects September 18, 2008 - 3:43pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of projects for negotiation of award of up to $7.3 million to 14 research teams, with a cost-shared value of over $18 million, under the DOE's competitive solicitation for Advanced

  7. 2016 DOE Project Management Workshop - "Enhancing Project Management" |

    Energy Savers [EERE]

    / 2015 Year-in-Review i 2015 YIR May 2016 Year-in-Review: 2015 Energy Infrastructure Events and Expansions Office of Electricity Delivery and Energy Reliability U.S. Department of Energy DOE / 2015 Year-in-Review ii 2015 YIR For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and Devon Streit, Deputy Assistant Secretary. Specific questions about this report may be directed to

  8. 2016 Solid Oxide Fuel Cells Project Portfolio | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 Solid Oxide Fuel Cells Project Portfolio Solid Oxide Fuel Cells are energy conversion devices that produce electric power through an electrochemical reaction rather than by combustion. A transformational technology, SOFC's inherent characteristics make them uniquely suitable to address the environmental, climate change and water concerns associated with fossil- fuel- based electric power generation. The mission of the Solid Oxide Fuel Cell Program is to enable the generation of efficient,

  9. Ceramic Technology Project database: March 1990 summary report. DOE/ORNL Ceramic Technology Project

    SciTech Connect (OSTI)

    Keyes, B.L.P.

    1992-07-01

    This report is the fifth in a series of semiannual data summary reports on information being stored in the Ceramic Technology Project (CTP) database. The overall system status as of March 31, 1990, is summarized, and the latest additions of ceramic mechanical properties data are given for zirconia, silicon carbide, and silicon nitride ceramic mechanical properties data, including some properties on brazed specimens.

  10. NEW - DOE P 481.1, DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SSP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work.

  11. DOE intends to extend the Advanced Mixed Waste Treatment Project contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy DOE in the News: Tidal Power in Maine on PBS Newshour DOE in the News: Tidal Power in Maine on PBS Newshour September 18, 2013 - 11:54am Addthis The Water Power Program received national TV exposure on the September 15th episode of "PBS Newshour Weekend" for its pioneering tidal power project in the state of Maine with Ocean Renewable Power Corporation (ORPC). The Newshour segment, featuring an interview with Jose Zayas, focuses on the deployment of ORPC's TidGen device in

  12. DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia Lennie Klebanoff and Joe Pratt Sandia National Laboratories Livermore CA 94551 September 30, 2010 "Exceptional Service in the National Interest" DOE-DOD Workshop on Uses of Fuel Cells in Aviation * ~ 8,300 employees * ~ 1,500 PhDs; ~2800 MS/MA * ~ 700 on-site contractors Sandia National Laboratories Sandia is a government-owned/contractor operated (GOCO) facility. Sandia Corporation, a Lockheed Martin company,

  13. EERE Success Story-DOE-Funded Project is First Permanent Facility to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Co-produce Electricity from Geothermal Resources at an Oil and Gas Well | Department of Energy Project is First Permanent Facility to Co-produce Electricity from Geothermal Resources at an Oil and Gas Well EERE Success Story-DOE-Funded Project is First Permanent Facility to Co-produce Electricity from Geothermal Resources at an Oil and Gas Well May 12, 2016 - 11:03am Addthis Source: Kirby Baier of Continental Resources Source: Kirby Baier of Continental Resources The U.S. Department of

  14. DOE Announces Clean Energy Projects for Low-Carbon Communities of the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Americas Initiative | Department of Energy Clean Energy Projects for Low-Carbon Communities of the Americas Initiative DOE Announces Clean Energy Projects for Low-Carbon Communities of the Americas Initiative January 8, 2010 - 12:00am Addthis WASHINGTON, D.C. - In support of the Energy and Climate Partnership of the Americas announced by President Obama at the 2009 Summit of the Americas, Secretary Steven Chu announced today that the U.S. Department of Energy has selected three initial

  15. DOE National Laboratory Research Projects Win 31 R&D Awards for 2007 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Laboratory Research Projects Win 31 R&D Awards for 2007 DOE National Laboratory Research Projects Win 31 R&D Awards for 2007 October 19, 2007 - 3:21pm Addthis WASHINGTON, DC - The U.S. Department of Energy's Under Secretary for Science Raymond L. Orbach today lauded researchers from ten of the Department of Energy's world-class national laboratories that last night were awarded 31 of the world's top 100 scientific and technological innovations in 2007,

  16. DOE Selects Projects to Advance Technologies for the Co-Production of Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Hydrogen, Fuels or Chemicals from Coal-Biomass Feedstocks | Department of Energy to Advance Technologies for the Co-Production of Power and Hydrogen, Fuels or Chemicals from Coal-Biomass Feedstocks DOE Selects Projects to Advance Technologies for the Co-Production of Power and Hydrogen, Fuels or Chemicals from Coal-Biomass Feedstocks August 18, 2010 - 1:00pm Addthis Washington, DC - Eight projects that will focus on gasification of coal/biomass to produce synthetic gas (syngas) have been

  17. DOE Tour of Zero: McKinley Project by Carl Franklin Homes and Green Extreme

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Homes | Department of Energy McKinley Project by Carl Franklin Homes and Green Extreme Homes DOE Tour of Zero: McKinley Project by Carl Franklin Homes and Green Extreme Homes 1 of 9 Carl Franklin Homes and Green Extreme Homes Community Development Corporation built this 1,594-square-foot two-story home in Garland, Texas, to the performance criteria of the U.S. Department of Energy Zero Energy Ready Home (ZERH) program. 2 of 9 This affordable energy-efficient home was built for a husband and

  18. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O 580 .1 A Admin Chg 1 3 10-23 2012 U.S. Department of Energyadmin change DOE O XXX.XWashington, D.C. DOE O XXX.X Chg X: XX-XX-XXXX SUBJECT: ADMINISTRATIVE CHANGE TO DOE O XXX.X, TITLE (IN ITALICS) EXPLANATION OF CHANGES. [This information can be copied from the Approval Memo] LOCATIONS OF CHANGES: Page Paragraph Changed To [Original text that was changed] [Revised text]

  19. Strategic Partnership Projects(SPP) | U.S. DOE Office of Science...

    Office of Science (SC) Website

    of DOE program objectives; does not place the laboratory in direct competition with the domestic private sector; and does not create a potential future burden on DOE resources. ...

  20. Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01)

    SciTech Connect (OSTI)

    N /A

    2003-10-02

    The Bonneville Power Administration prepared an Environmental Assessment (DOE/EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a resident trout hatchery on the Colville Indian Reservation to partially mitigate for anadromours and other fish losses resulting from the construction and operation of the Chief Joseph Dam and Grand Coulee Dam hydroelectric projects. Since the hatchery was constructed, ongoing Operation and Maintenance (O&M) and Monitoring and Evaluation (M&E) activities have been funded by BPA. The O&M and M&E activities examined in the EA were very general in nature due to the fact the project was in the conceptual stage. Since that time the hatchery has refined the need for specific O&M and M&E activities, proposed for fiscal year 2004, (funding for projects runs from October 2003 to September 2004). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze the environmental impacts that would result from the specific O&M and M&E activities proposed for fiscal year 2004.

  1. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect (OSTI)

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support

  2. DOE Moab Project Reaches Halfway Mark in Mill Tailings Removal 2.5 Million Hours Safely Worked

    Office of Energy Efficiency and Renewable Energy (EERE)

    (Grand Junction, CO) ― The U.S. Department of Energy (DOE) has reached 8 million tons of uranium mill tailings removed from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project.

  3. DOE-Funded Research Projects Win 39 R&D Awards for 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-Funded Research Projects Win 39 R&D Awards for 2010 WASHINGTON, DC - U.S. Department of Energy researchers have won 39 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted awards are presented annually in recognition of exceptional new products, processes, materials or software developed throughout the world and introduced into the market the previous year. "I want to congratulate

  4. DOE Issues Final Request for Proposals for the West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Final Request for Proposals (RFP) for the West Valley Demonstration Project Supplemental Environmental Impact Statement (WVDP-SEIS) procurement that will provide support to the U.S. Department of Energy’s (DOE) West Valley Demonstration Project (WVDP) and the New York State Energy Research and Development Authority (NYSERDA) in developing a Supplemental Environmental Impact Statement for the WVDP and Western New York Nuclear Service Center.

  5. DOE Issues Draft Request for Proposals for the West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposals (RFP) for the West Valley Demonstration Project Supplemental Environmental Impact Statement (WVDP-SEIS) procurement that will provide support to the U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), and the New York State Energy Research and Development Authority (NYSERDA) in developing a Supplemental Environmental Impact Statement for the WVDP and Western New York Nuclear Service Center.

  6. SC Federal Project Directors | U.S. DOE Office of Science (SC...

    Office of Science (SC) Website

    Federal Project Directors (FPD) and FPD Resources Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD ...

  7. Notice of Intent to Revise Department of Energy (DOE) Guide 413.3-15, Project Execution Plans.

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  8. Notice of Intent to Revise Department of Energy (DOE) Guide 413.3-15, Project Execution Plans.

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-10-01

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  9. USDA, DOE to Invest up to $18.4 million for Biomass Research, Development and Demonstration Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 1 of 3 News Media Contact(s): For Immediate Release USDA: Jim Brownlee, (202) 720-4623 March 4, 2008 DOE: Julie Ruggiero, (202) 586-4940 USDA, DOE to Invest up to $18.4 million for Biomass Research, Development and Demonstration Projects WASHINGTON, DC - U.S. Department of Agriculture (USDA) Secretary Ed Schafer and U.S. Department of Energy (DOE) Secretary Samuel Bodman today announced that combined, USDA and DOE will invest up to $18.4 million, over three years, for 21 biomass research

  10. Project Construction Photos | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Construction Photos Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us SC Projects Project Construction Photos Print Text

  11. Final Report for DOE Project DE-FC07-99CH11010

    SciTech Connect (OSTI)

    Jed Randall; Robert Kean

    2003-10-22

    Department of Energy award number DE-FC07-99CH11010, Enhanced Utilization of Corn Based Biomaterials, supported a technology development program sponsored by Cargill Dow LLC from September 30, 1999 through June 30, 2003. The work involved fundamental scientific studies on poly lactic acid (PLA), a new environmentally benign plastic material from renewable resources. DOE funds supported academic research at the Colorado School of Mines and the National Renewable Energy Laboratory (NREL), and industry cost share was directed towards applied research into new product development utilizing the fundamental information generated by the academic partners. Under the arrangement of the grant, the fundamental information is published so that other companies can utilize it in evaluating the applicability of PLA in their own products. The overall project objective is to increase the utilization of PLA, a renewable resource based plastic, currently produced from fermented corn sugar.

  12. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    SciTech Connect (OSTI)

    White, T.; Contos, L.; Adams, L.

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  13. A Guide to Community Shared Solar: Utility, Private, and Nonprofit Project Development (Book), Powered by SunShot, U.S. Department of Energy (DOE)

    Broader source: Energy.gov [DOE]

    This guide is organized around three sponsorship models: utility-sponsored projects, projects sponsored by special purpose entities - businesses formed for the purpose of producing community solar power, and non-profit sponsored projects. The guide addresses issues common to all project models, as well as issues unique to each model.

  14. DOE Zero Energy Ready Home Case Study 2014: Murphy Brothers Contracting, Shore Road Project, Old Greenwich, CT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Murphy Brothers Contracting Shore Road Project Old Greenwich, CT DOE ZERO ENERGY READY HOME(tm) CASE STUDY The U.S. Department of Energy invites home builders across the country to meet the extraordinary levels of excellence and quality specified in DOE's Zero Energy Ready Home program (formerly known as Challenge Home). Every DOE Zero Energy Ready Home starts with ENERGY STAR Certified Homes Version 3.0 for an energy-efficient home built on a solid foundation of building science research.

  15. Project Assessment (OPA) Homepage | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programs » OPA Home Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Federal Project Director of the Year Mr. Frank Crescenzo, Federal Project Director for NSLS-II at BNL For demonstrating exceptional leadership and project

  16. DOE Office of Indian Energy Professional Course: Tribal Renewable Energy Project Development and Financing Essentials Text Version

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Professional Courses: Tribal Renewable Energy Project Development and Financing Essentials (text version) Below is the text version of the Webinar titled "DOE Office of Indian Energy Professional Course: Tribal Renewable Energy Development and Financing Essentials." Slide 1 Sara Farrar-Nagy: Hello. I'm Sara Farrar-Nagy with the National Renewable Energy Laboratory. Welcome to today's webinar on tribal renewable energy project development and financing essentials sponsored by the U.S.

  17. DOE Webinar: Public Relations for Energy Sustainability-A Framework for Engaging Your Stakeholders Productively Around New Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Webinar Public Relations for Energy Sustainability A framework for engaging your stakeholders productively around new energy projects Lisa Calhoun CEO, Write2Market   Leads a team of experts in getting energy and tech companies the reputations they deserve  Invented Triple A Industry Leadership methodology  University of Texas (MBA), Baylor (BA) @lisa_calhoun or @write2market Why are sustainability projects different? Be the forum for debate Reach out to both sides and

  18. DOE Selects Projects To Enhance Its Research into Recovery of Rare Earth Elements from Coal and Coal Byproducts

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has selected 10 projects to receive funding for research in support of the lab’s program on Recovery of Rare Earth Elements from Coal and Coal Byproducts. The selected research projects will further program goals by focusing on the development of cost-effective and environmentally benign approaches for the recovery of rare earth elements (REEs) from domestic coal and coal byproducts.

  19. DOE-Funded Research Projects Win 35 R&D 100 Awards for 2003 | U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) 35 R&D 100 Awards for 2003 About About Home Organization Budget Field Operations Federal Advisory Committees History Scientific and Technical Information Honors & Awards Presidential Early Career Awards for Scientists and Engineers (PECASE) The Enrico Fermi Award The Ernest Orlando Lawrence Award DOE Nobel Laureates Federal Laboratory Consortium Excellence in Technology Transfer Awards R&D 100 Awards Jobs Brochures, Logos, & Information Resources

  20. Various Project Management Reports | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown

  1. DOE Selects Project for up to $7 Million of Federal Funding to Modernize Hawaii’s Energy Infrastructure

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability (OE) Kevin Kolevar announced the Department’s plans to invest up to $7 million over three years in a demonstration project led by the University of Hawaii’s Natural Energy Institute to increase efficiency in the State’s energy infrastructure.

  2. DOE Selects Projects for up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid

    Broader source: Energy.gov [DOE]

    Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin Kolevar today announced the Department's plans to invest up to $50 million over five years (Fiscal Years 2008 - 2012), subject to appropriations from Congress, in nine demonstration projects competitively selected to increase efficiency in the nation's electricity grid.

  3. DOE Selects Nine Projects to Receive Funding for Carbon Storage Intelligent Monitoring and Well Integrity and Mitigation Research

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has selected nine projects to receive funding to research new CO2 storage technologies devoted to intelligent monitoring systems and advanced well integrity and mitigation approaches through DOE’s Carbon Storage Program.

  4. Results of the Boeing/DOE DECC Phase 1 stirling engine project

    SciTech Connect (OSTI)

    STONE,KENNETH W.; CLARK,TERRY; NELVING,HANS; DIVER JR.,RICHARD B.

    2000-03-02

    Phase I of Boeing Company/DOE Dish Engine Critical Component (DECC) Project started in April of 1998 and was completed in 1999. The Phase I objectives, schedule, and test results are presented in this paper. These data shows the power, energy, and mirror performance are comparable to that when the hardware was first manufactured 15 years ago. During the Phase I and initial Phase II test period the on-sun system accumulated over 3,800 hours of solar-powered operating time, accumulated over 4,500 hours of concentrator solar tracking time, and generated over 50,000 kWh of grid-compatible electrical energy. The data also shows that the system was available 95 {percent} of the time when the sun's insolation level was above approximately 300 w/m{sup 2}, and achieved a daily energy efficiency between 20{percent} and 26{percent}. A second concentrator was refurbished during Phase I and accumulated over 2,200 hours of solar track time. A second Stirling engine operated 24 hours a day in a test cell in Sweden and accumulated over 6,000 test hours. Discussion of daily operation shows no major problems encountered during the testing that would prevent commercialization of the technology. Further analysis of the test data shows that system servicing with hydrogen, coolant and lubricating oil should not be a major O and M cost.

  5. DOE Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop

    Broader source: Energy.gov [DOE]

    Presented by the Tribal Energy Program and the U.S. Department of Energy (DOE) Office of Indian Energy with support from DOE's National Renewable Energy Laboratory, this interactive workshop will...

  6. Solid-State Lighting Patents Resulting from DOE-Funded Projects...

    Broader source: Energy.gov (indexed) [DOE]

    2013 DOE Solid-State Lighting Program Fact Sheet patentsfactsheetfeb2013.pdf (797.7 KB) More Documents & Publications Solid-State Lighting Patents Resulting from DOE-Funded ...

  7. DOE Zero Energy Ready Home Case Study: Shore Road Project- Old Greenwich, Connecticut

    Broader source: Energy.gov [DOE]

    This case study describes the builder Murphy Brothers' first DOE Zero Energy Ready Home in Old Greenwich, CT.

  8. Solid-State Lighting Patents Resulting from DOE-Funded Projects

    SciTech Connect (OSTI)

    2015-01-30

    Fact sheet that lists the primary research organizations and patent applications both submitted to and granted by DOE.

  9. Solid-State Lighting Commercial Product Development Resulting from DOE-Funded Projects

    SciTech Connect (OSTI)

    2015-06-30

    Nnapshot of commercialized products directly developed or enabled by DOE Solid-State Lighting Program R&D funding.

  10. Novel Lithium Ion Anode Structures: Overview of New DOE BATT Anode Projects

    Broader source: Energy.gov [DOE]

    2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

  11. Long-Term Water Projections and Climate Change | U.S. DOE Office...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Long-Term Water Projections and Climate Change Biological and Environmental Research (BER) ... Long-Term Water Projections and Climate Change Model scenarios predict increased scarcity ...

  12. OSTIblog Articles in the DOE Research and Development (R&D) Project...

    Office of Scientific and Technical Information (OSTI)

    Network (EPN), Energy Citations Database (ECD), Energy Files, Federal R&D Project Summaries, Information Bridge (IB), osti, patents, project summaries, sti, theses Read more... ...

  13. 2008 Project Management Awards | U.S. DOE Office of Science ...

    Office of Science (SC) Website

    Presented at the 2009 Department of Energy Project Management Workshop SECRETARY'S AWARD ... Insert photo credit here... Left to Right: Secretary Chu, Daniel Green (CMS Project ...

  14. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect (OSTI)

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  15. Texas Solar Collaboration DOE Rooftop Solar Challenge City of Houston Project Summary

    SciTech Connect (OSTI)

    Ronk, Jennifer

    2013-02-14

    The City of Houston is committed to achieving a sustainable solar infrastructure. In 2008, Houston was named a United States Department of Energy (DOE) Solar America City. As a Solar America City, Houston teamed with the Houston Advanced Research Center (HARC), Sandia National Laboratory (Sandia), industry, and academia, to implement the Solar Houston Initiative and prepare the Solar Houston Plan. The Solar Houston initiative was focused on identifying and overcoming barriers associated with establishing a solar infrastructure that is incorporated into the City of Houston’s overall energy plan. A broad group of Houston area stakeholders, facilitated by HARC, came together to develop a comprehensive solar plan that went beyond technology to address barriers and establish demonstrations, public outreach, education programs and other activities. The plan included proposed scopes of work in four program areas: policies, solar integration, public outreach, and education. Through the support of the DOE SunShot Rooftop Solar Challenge (RSC) grant to the Texas Collaboration (San Antonio, Austin, and Hosuton), Houston has been able to implement several of the recommendations of the Solar Houston Plan. Specific recommendations that this project was able to support include; Working with the other Texas Solar America Cities (San Antonio and Austin), to harmonize permitting and inspection processes to simplify for installers and lower soft costs of installation; Participating in state level solar policy groups such as the Texas Renewable Energy Industries Association (TRIEA); Continued coordination with the local transmission and distribution utility (CenterPoint) and retail electric providers (REP); Identification of opportunities to improve permitting and interconnection; Providing training on PV systems to City inspectors; Educating the public by continuing outreach, training, and workshops, particularly using the the Green Building Resources Center; Evaluating methods of

  16. Final Report for DOE grant project FG02-07ER41458 [Dense Quark Matter in Magnetic Fields

    SciTech Connect (OSTI)

    Incera, Vivian

    2012-01-24

    Final Report for DOE grant DE-FG02-07ER41458. This grant was originally a three-year project. However, this final report summarizes the results of the first two years, as at the end of the second year of the grant the PIs moved to a new university and the grant was closed. The work done under the first two years of the DOE grant led to several papers and presentations. It also served to train one undergraduate and three graduate students.

  17. Recommendation 204: Unique assest retention | Department of Energy

    Office of Environmental Management (EM)

    4: Unique assest retention Recommendation 204: Unique assest retention We recommend that DOE identify these unique assets. Further, we recommend that DOE and stakeholders (e.g. local communities, tribal governments, and the public) review these unique assets for their potential future use before they are gone forever. Recommendation 204 (51.22 KB) DOE response to recommendation 204 (30 KB) More Documents & Publications EM SSAB Recommendations and Letters - 2011-01 EM SSAB Recommendations and

  18. NEW - DOE O 481.1C Admin Chg 2, Strategic Partnerships Projects (Formerly Known as Work for Others (Non-Department of Energy Funded Work)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Strategic Partnership Projects is work performed for non-DOE entities by DOE/(NNSA personnel and/or their respective contractor personnel or the use of DOE/NNSA facilities for work that is not directly funded by DOE/NNSA appropriations. This Admin Chg address primarily address references to revised directives and the results of departmental reorganization. In addition, the Secretary directed effective immediately work formerly known as Work for Others (WFO) to be renamed Strategic Partnership Projects (SPPs). Admin Chg 2, dated 3-9-15, cancels DOE O 481.1C Admin Chg 1, dated 3-14-11.

  19. DOE Announces Start of Recovery Act Funded Cleanup Projects at Y-12

    Broader source: Energy.gov [DOE]

    DOE announces that cleanup of the Old Salvage Yard at the Y-12 National Security Complex has started using funding received from the Recovery Act.

  20. The Nagra-DOE Cooperative Project (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Subject: 05 NUCLEAR FUELS; RADIOACTIVE WASTES; UNDERGROUND DISPOSAL; GROUND WATER; FLUID FLOW; ROCKS; SWITZERLAND; US DOE; GEOLOGY; HYDROLOGY; GEOLOGIC FRACTURES; TWO-PHASE FLOW; ...

  1. DOE project could impact local traffic in coming weeks | Department of

    Energy Savers [EERE]

    DOE eGuide DOE eGuide April 17, 2014 - 10:45am Addthis What is the DOE eGuide? The DOE eGuide is a toolkit designed to help organizations implement an energy management system through an organized step by step process at three different levels: Foundational, ISO50001 and Superior Energy Performance. It includes forms, checklists, templates, examples, and guidance to assist the Energy Team throughout the implementation process. The five major steps of the eGuide start with the decision to utilize

  2. Solid-State Lighting Commercial Product Development Resulting from DOE-Funded Projects

    Broader source: Energy.gov (indexed) [DOE]

    The Solid-State Lighting (SSL) R&D Plan is a consolidation of the Department of Energy (DOE) SSL Multi-Year Program Plan (MYPP) and the DOE SSL Manufacturing R&D Roadmap that DOE has published and updated in previous years. The SSL R&D Plan provides analysis and direction for ongoing R&D activities to advance SSL technology and increase energy savings. The Roadmap also reviews SSL technology status and trends for both LEDs and OLEDs and offers an overview of the current DOE SSL

  3. DOE Zero Energy Ready Home Case Study: Shore Road Project - Old...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Ready Home Case Study, Nexus EnergyHomes, Frederick, MD, Production DOE Zero Energy Ready Home Case Study: Weiss Building & Development LLC, System Home, River Forest, IL

  4. Fermilab | Directorate | Office of Project Management Oversight...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE links DOE Office of Project Assessment (SC-28) DOE Office of Project Assessment Project Management Processes and Procedures DOE Directives Home Page DOE Policies, Orders and ...

  5. Final Report on DOE Project entitled Dynamic Optimized Advanced Scheduling of Bandwidth Demands for Large-Scale Science Applications

    SciTech Connect (OSTI)

    Ramamurthy, Byravamurthy

    2014-05-05

    In this project, developed scheduling frameworks for dynamic bandwidth demands for large-scale science applications. In particular, we developed scheduling algorithms for dynamic bandwidth demands in this project. Apart from theoretical approaches such as Integer Linear Programming, Tabu Search and Genetic Algorithm heuristics, we have utilized practical data from ESnet OSCARS project (from our DOE lab partners) to conduct realistic simulations of our approaches. We have disseminated our work through conference paper presentations and journal papers and a book chapter. In this project we addressed the problem of scheduling of lightpaths over optical wavelength division multiplexed (WDM) networks. We published several conference papers and journal papers on this topic. We also addressed the problems of joint allocation of computing, storage and networking resources in Grid/Cloud networks and proposed energy-efficient mechanisms for operatin optical WDM networks.

  6. DOE Collaboration with National Geographic's JASON Project Yields Three CODiE Awards

    Broader source: Energy.gov [DOE]

    The JASON Project's multimedia energy curriculum has earned three CODiE Awards from the Software & Information Industry Association.

  7. DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-12-17

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SPP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work. Does not cancel/supersede other directives.

  8. DOE completes decade-long project at Oak Ridge gaseous diffusion complex |

    Energy Savers [EERE]

    Department of Energy Selects 8(a) Small Business to Provide Waste Tracking Services DOE Selects 8(a) Small Business to Provide Waste Tracking Services November 14, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a competitive small business set-aside contract to Ma-Chis Lower Creek Indian Tribe Enterprises Inc. (Ma-Chis) of Kinston, Alabama to provide DOE Transportation Tracking and

  9. EVALUATION OF THOR MINERALIZED WASTE FORMS FOR THE DOE ADVANCED REMEDIATION TECHNOLOGIES PHASE 2 PROJECT

    SciTech Connect (OSTI)

    Crawford, C.; Jantzen, C.

    2012-02-02

    The U.S. Department of Energy's (DOE) Office of River Protection (ORP) is responsible for the retrieval, treatment, immobilization, and disposal of Hanford's tank waste. Currently there are approximately 56 million gallons of highly radioactive mixed wastes awaiting treatment. A key aspect of the River Protection Project (RPP) cleanup mission is to construct and operate the Waste Treatment and Immobilization Plant (WTP). The WTP will separate the tank waste into high-level and low-activity waste (LAW) fractions, both of which will subsequently be vitrified. The projected throughput capacity of the WTP LAW Vitrification Facility is insufficient to complete the RPP mission in the time frame required by the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement (TPA), i.e. December 31, 2047. Therefore, Supplemental Treatment is required both to meet the TPA treatment requirements as well as to more cost effectively complete the tank waste treatment mission. The Supplemental Treatment chosen will immobilize that portion of the retrieved LAW that is not sent to the WTP's LAW Vitrification facility into a solidified waste form. The solidified waste will then be disposed on the Hanford site in the Integrated Disposal Facility (IDF). In addition, the WTP LAW Vitrification facility off-gas condensate known as WTP Secondary Waste (WTP-SW) will be generated and enriched in volatile components such as Cs-137, I-129, Tc-99, Cl, F, and SO{sub 4} that volatilize at the vitrification temperature of 1150 C in the absence of a continuous cold cap. The current waste disposal path for the WTP-SW is to recycle it to the supplemental LAW treatment to avoid a large steady state accumulation in the pretreatment-vitrification loop. Fluidized Bed Steam Reforming (FBSR) offers a moderate temperature (700-750 C) continuous method by which LAW and/or WTP-SW wastes can be processed irrespective of whether they contain organics, nitrates, sulfates

  10. West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    435.1-1, Chapter II, Section B. To determine that waste is incidental to reprocessing ... in a solid physical form at a concentration that does not exceed the applicable ...

  11. DOE-TSPP-4, Registering a Technical Standard Project - July 1...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to DOE Technical Standards, or to register a person's or organization's intent to work with a non-Government standards body to prepare or revise a non-Government standard. ...

  12. DOE and USCAR Announce $70 Million Project to Accelerate Development of Lightweight, High-Strength Materials

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) and the United States Council for Automotive Research (USCAR) today announced a $70 million, five year agreement to develop lightweight, high...

  13. Pika Energy Develops Innovative Manufacturing Process and Lowers Production Cost Under DOE Competitiveness Improvement Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL) recently awarded Pika Energy of Westbrook, Maine, with a third round of funding under the DOE Competitiveness...

  14. The Modern Grid Initiative is a DOE-funded project managed by...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    team does have some interesting insights into the future possibilities. The GenX GenY Theory of Grid Modernization Traveling through airports a lot, I see a distinct difference...

  15. DOE Announces Notice of Intent to Issue Funding for Tribal Clean Energy and Energy Efficiency Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs intends to issue a funding opportunity announcement (FOA) later this year that will help promote tribal energy...

  16. DOE Announces $27 Million to Reduce Costs of Solar Energy Projects,

    Office of Environmental Management (EM)

    Energy Alaska Native Village Renewable Energy Workshop Agenda DOE Alaska Native Village Renewable Energy Workshop Agenda Download the agenda for the DOE Alaska Native Village Renewable Energy Workshop entitled "Renewable Energy and Energy Efficiency for Alaska Native Community Development" being held October 16-17, 2012, in Anchorage, Alaska. TEP AK Workshop Agenda 10-4-2012.pdf (83.86 KB) More Documents & Publications Alaska Native Village Energy Development Workshop Office of

  17. ENERGY STAR Window Specifications for DOE Zero Energy Ready Home Projects |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM PROJECTS INVOLVING RESIDENTIAL WEATHERIZATION WORK eecbg_guidance_not_using_wap_rates_05062010.pdf (57.2 KB) More Documents & Publications Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program Projects Involving Residential Weatherization Work DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) PROGRAM PROJECTS

  18. 2013 DOE Bioenergy Technologies Office(BETO) IBR Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office(BETO) IBR Project Peer Review *© 2013 ICM, Inc. All Rights Reserved. *1 Recovery Act: Pilot Integrated Cellulosic Biorefinery Operations to Fuel Ethanol Award Number: DE-EE0002875 May 20, 2013 Integrated Biorefinery Program Review Panel Douglas B. Rivers, Ph.D. ICM, Inc. Project Description > Project Location - ICM, Inc., St. Joseph MO > Company headquarters - ICM, Inc., Colwich, KS > High Level overview of:  Feedstock handling * Dry Frac Corn Fiber, Switchgrass/Energy

  19. DOE CD-1/2/3a Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CD-2 Documentation Detailed Resource Loaded Schedule Microsoft Project File (mpp) Gantt Chart (pdf) Critical Path (pdf) Costs Note: unless otherwise indicated, the costs in...

  20. DOE Funds 15 New Projects to Develop Solar Power Storage and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for up to approximately 67.6 million, will facilitate the development of lower-cost energy storage for concentrating solar power (CSP) technology. These projects support...

  1. DOE to Invest up to $4.4 Million in Six Innovative Biofuels Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    biological conversion of lignocellulosic biomass. The project will use a novel enzyme pellet scheme for efficient fermentation of both five-carbon and six-carbon sugars. The...

  2. DOE Award Number DE-SC0006012 Recipient: NCAR Project Title:...

    Office of Scientific and Technical Information (OSTI)

    to Integrated Assessment Modeling and Water-Climate issues. It also provided recommendations on how to establish and pursue projects related to IAMs and Water Management issues. ...

  3. DOE-Sponsored Mississippi Project Hits 1-Million-Ton Milestone for Injected CO2

    Broader source: Energy.gov [DOE]

    A large-scale carbon dioxide storage project in Mississippi has become the fifth worldwide to reach the important milestone of more than 1 million tons injected.

  4. DOE-Funded Research Projects Win 39 R&D Awards for 2010 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Strontium Iodide Scintillator for Gamma Ray Spectroscopy: This project was submitted by ... Mode-Synthesizing Atomic Force Microscope: This novel measurement system can obtain a ...

  5. Various Project Management Reports | U.S. DOE Office of Science...

    Office of Science (SC) Website

    and Project Management Concerns at the National Nuclear Security Administration and Office of Environmental Management .pdf file (230KB), March 2009 HIGH-RISK SERIES: An ...

  6. What Does the Sun Give Us: Science Projects in Renewable Energy and Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What Does the Sun Give Us? (Five Activities) Grades: 5-8, 9-12 Topic: Solar Owner: National Renewable Energy Laboratory This educational material is brought to you by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. This lesson plan may contain links to other resources, including suggestions as to where to purchase materials. These links, product descriptions, and prices may change over time. What does the Sun give us? For the Teacher One of the fun parts of

  7. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    SciTech Connect (OSTI)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  8. DOE CD-3b Review of the MINERvA Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    also includes tasks funded by NSF MRI grant) Microsoft Project File (21MB mpp file ) Gantt Chart (pdf) Critical Path (pdf) Costs Note: unless otherwise indicated, the costs in...

  9. DOE-Sponsored Project Pushes the Limits of Seismic-While-Drilling Technology

    Broader source: Energy.gov [DOE]

    In a project sponsored by the U.S. Department of Energy, Technology International Inc. has developed a breakthrough borehole imaging system that stands on the cusp of commercialization.

  10. DOE Project Leads to New Alliance to Promote Low-Impact Drilling

    Broader source: Energy.gov [DOE]

    A project supported by the Office of Fossil Energy's National Energy Technology Laboratory (NETL) has given rise to a major new research consortium to promote advanced technology for low-impact oil and gas drilling.

  11. DOE Research Projects to Examine Promising Geologic Formations for CO2 Storage

    Broader source: Energy.gov [DOE]

    The Department of Energy today announced 11 projects valued at $75.5 million aimed at increasing scientific understanding about the potential of promising geologic formations to safely and permanently store carbon dioxide (CO2).

  12. UQM Patents Non-Rare Earth Magnet Motor under DOE-Supported Project

    Broader source: Energy.gov [DOE]

    Through a cooperative R&D project with the Vehicle Technologies Office (VTO), UQM Technologies, a company developing propulsion systems for electric, hybrid electric, plug-in hybrid electric...

  13. DOE RFP Seeks Projects for Improving Environmental Performance of Unconventional Natural Gas Technologies

    Broader source: Energy.gov [DOE]

    Research projects to study ways for improving the environmental performance of unconventional gas development are being sought by the National Energy Technology Laboratory, a facility of the U.S. Department of Energy’s Office of Fossil Energy.

  14. DOE Seeks Proposals to Increase Investment in Industrial Carbon Capture and Sequestration Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has issued a Funding Opportunity Announcement soliciting projects to capture and sequester carbon dioxide from industrial sources and to put CO2 to beneficial use.

  15. DOE Launches the Advanced Research Projects Agency-Energy, or ARPA-E

    Office of Energy Efficiency and Renewable Energy (EERE)

    President Barack Obama announced the launch of the Advanced Research Projects Agency-Energy (ARPA-E) on April 27 as part of a sweeping announcement about federal investment in research and development and science education.

  16. OSTIblog Articles in the DOE Research and Development (R&D) Project...

    Office of Scientific and Technical Information (OSTI)

    Research and Development (R&D) Project Summaries Topic Forms of STI - pt. 3 by Tim Byrne 23 Jun, 2008 in Products and Content In the first two parts to this post (Forms of STI and ...

  17. UMore Park Wind Turbine Project Loggerhead Shrike Survey, DOE/EA-1791 (June 2010)

    Broader source: Energy.gov [DOE]

    The project area is located in a region of the state where Loggerhead Shrikes (Lanius ludovicianus) are consistently observed and known to be nesting. With populations steadily declining throughout...

  18. DOE Publishes Best Practices Manual for Public Outreach and Education for Carbon Storage Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Regional Carbon Sequestration Partnerships program has released a new manual to recommend best practices for public outreach and education for carbon dioxide storage projects.

  19. Special Resource Study/Environmental Assessment for Manhattan Project Sites, DOE/EA-1868 (September 2010)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this study is to comply with the Manhattan Project National Historical Park Study Act (Public Law 108-340), passed in 2004, which directed the Secretary of the Interior to “conduct a...

  20. Utility to Purchase Electricity from Innovative DOE-Supported Clean Coal Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    An innovative clean coal technology project in Texas will supply electricity to the largest municipally owned utility in the United States under a recently signed Power Purchase Agreement, the U.S. Department of Energy announced today.