Powered by Deep Web Technologies
Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Project Management Coordination Office  

Energy.gov (U.S. Department of Energy (DOE))

The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area...

2

Secretary Bodman Announces DOE Technology Transfer Coordinator...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technology Transfer Coordinator Secretary Bodman Announces DOE Technology Transfer Coordinator June 29, 2007 - 2:36pm Addthis Establishes Policy Board; Strengthens DOE Efforts...

3

Project Management Coordination Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Coordination Office Project Management Coordination Office Project Management Coordination Office The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area of active project management. PMCO is also charged with providing integrated risk management and oversight of EERE work at numerous field sites. This includes activities ranging from performance and project management to monitoring and auditing. PMCO actively collaborates with EERE Offices and field elements. PMCO primarily engages the Golden Field Office, National Energy Technology Laboratory, Oak Ridge National Laboratory and other DOE Operations Offices. PMCO is EERE's corporate resource for Active Project Management, providing

4

MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS The DOE Office of Enforcement and Investigation (EH Enforcement) invoked a 120-day suspension of PAAA enforcement actions for issues associated with contractor Internal Dose Evaluation Programs (IDEP). Prior to initiation of the suspension, EH Enforcement had identified deficiencies in DOEcontractor implemented bioassay programs at numerous sites within the DOE complex. The commonality of the IDEP deficiencies at the various sites, as well as the possibility of the existence of similar deficiencies at other DOE sites, led EH Enforcement to the conclusion that a suspension of enforcement actions would be appropriate to provide DOE-contractors an opportunity to review their own

5

Coordinating DOE Technical Standards, TSPP-5  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-TSPP-5-2013 September 2013 COORDINATING DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Washington, D.C. 20585 DOE-TSPP-5-2013 Coordinating September 2013 DOE Technical Standards Program i CONTENTS 1. SCOPE ............................................................................................................................................ 1 1.1 Purpose ....................................................................................................................... 1 1.2 Applicability ................................................................................................................. 1 2. GENERAL ....................................................................................................................................... 1

6

DOE-TSPP-06; Coordination of DOE Technical Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Date: July 2004 COORDINATION OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-6 Coordination Revision: 6 Date: July 2004 DOE Technical Standards Program 2 CONTENTS 1. SCOPE ............................................................................................................................................3 1.1 Purpose ....................................................................................................................... 3 1.2 Applicability ................................................................................................................. 3 2. DOCUMENT COORDINATION......................................................................................................3

7

DOE Robotics Project  

SciTech Connect

This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

Not Available

1991-01-01T23:59:59.000Z

8

DOE Releases EPRI Report on Benefits of Regional Coordination...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers...

9

Project Management Coordination Office Contacts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination Office Contacts Coordination Office Contacts Project Management Coordination Office Contacts A complete list of Project Management Coordination Office points of contact can be found below. The best way to contact PMCO is by sending an email to PMCO@ee.doe.gov. PMCO is a small but nimble group that interacts with a variety of internal and external organizations. Their work includes analyzing current program efforts and the performance of PMCO's management support. Project Performance and Evaluation Methodology and Competency Management Audit Resolution Organization Chart See the Program Management Coordination Office organization chart. Name Phone Email Aguilar, Phaedra (on Detail) 202-287-5924 phaedra.aguilar@ee.doe.gov Baker, Jeff Deputy Director Desk: 720-356-1434

10

DOE Energy Challenge Project  

SciTech Connect

Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOEs interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

Frank Murray; Michael Schaepe

2009-04-24T23:59:59.000Z

11

DOE IDIQ ESPC Awarded Projects  

Energy.gov (U.S. Department of Energy (DOE))

Excel spreadsheet summarizes the U.S. Department of Energy's (DOE) indefinite delivery, indefinite quantity (IDIQ) energy savings performance contract (ESPC) awarded projects.

12

DOE-TSPP-6, Coordination of DOE Technical Standards - July 1, 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-TSPP-6, Coordination of DOE Technical Standards - July 1, 2009 DOE-TSPP-6, Coordination of DOE Technical Standards - July 1, 2009 DOE-TSPP-6, Coordination of DOE Technical Standards - July 1, 2009 Technical Standards Program Procedures (TSPP) - August 26, 2009 This procedure provides guidance on the formal coordination of DOE Technical Standards in the DOE Technical Standards Program (TSP). The purpose of coordination of draft technical standards is to solicit and receive comments from interested persons and organizations in order to improve and correct technical standards. DOE Technical Standards are coordinated through the electronic RevCom for TSP process. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, integrating contractors, and laboratories (hereafter referred to collectively as "DOE

13

Major DOE Biofuels Project Locations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Biofuels Project Locations Biofuels Project Locations BlueFire Ethanol Biochemical Municipal Solid Waste (Mecca, CA) Poet Biochemical Corn Cob/Corn Fiber (Emmetsburg, IA) Lignol Biochemical Woody Biomass- Ag Residues (Grand Junction, CO) ICM Biochemical Switchgrass, Forage Sorghum, Stover (St. Joseph, MO) Abengoa Biochemica Agricultural Residue (Hugoton, KS) DOE Joint Bioenergy Institute (Berkeley, CA) DOE Great Lakes Bioenergy Research Center (Madison, WI) DOE Bioenergy Science Center (Oak Ridge, TN) NewPage Thermochemical Woody Biomass - Mill Residues (Wisconsin Rapids, WI) Range Fuels Thermochemical Woody Waste (Soperton, GA) DSM Innovation Center Biochemical Various (Parsippany, NJ) Novozymes Biochemical Various (Davis, CA) Genencor Biochemical Various (Palo Alto, CA) Verenium Corp Biochemical Various (San Diego, CA)

14

Work as coordination and coordination as work: A process perspective on FLOSS development projects  

E-Print Network (OSTI)

and coordination as work: A process perspective on FLOSS development projects Abstract Coordination in work teamsWork as coordination and coordination as work: A process perspective on FLOSS development projects Dipartimento Impresa e Lavoro Università degli Studi di Cassino Cassino Italy #12;Work as coordination

Crowston, Kevin

15

The DOE Artificial Retina Project  

NLE Websites -- All DOE Office Websites (Extended Search)

ENvisioNiNG siGht for thE BLiND ENvisioNiNG siGht for thE BLiND The DOE Artificial Retina Project Leveraging DOE expertise to enhance the quality of life for millions Major advances achieved by researchers in the U.S. Department of Energy's (DOE) Artificial Retina Project are beginning to offer some hope to millions of people blinded by retinal diseases worldwide. In a breakthrough operation performed by project leaders at the Doheny Eye Institute (University of Southern California) in 2002, doctors threaded an electrode-studded array through an incision into the eye of a man who had been blind for 50 years and tacked it onto his damaged retina. Within weeks, the 77-year-old patient could see patterns of light and dark that allowed him to detect motion and locate and differentiate

16

Active DOE Technical Standards Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Active) Active) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Status Date P1073- 2003REV Configuration Management DOE-STD-1073-2003REV James O'Brien (HS-33) Mary Frances Haughey (301) 903-2867 mary.haughey@hq.doe.gov Initiated - In Development 01/24/2013 P1095- 2011REV Department of Energy Laboratory Accreditation Program External Dosimatry Technical Standard

17

DOE Recovery Act Field Projects | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Recovery Act Field Projects DOE Recovery Act Field Projects DOE Recovery Act Field Projects View All Maps Addthis...

18

Major DOE Biofuels Project Locations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major DOE Biofuels Project Locations Major DOE Biofuels Project Locations Major DOE Biofuels Project Locations More Documents & Publications Major DOE Biofuels Project Locations...

19

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Hydrate Production from Alaskan Permafrost Last Reviewed 02/05/2010 Methane Hydrate Production from Alaskan Permafrost Last Reviewed 02/05/2010 DE-FC26-01NT41331 photo of new Anadarko drilling rig in place at Hot Ice No.1 on Alaska's North Slope Hot Ice No. 1 Drilling Platform courtesy Anadarko Petroleum Corp. Goal The goal of the project was to develop technologies for drilling and recovering hydrates in arctic areas. The specific objectives were to drill, core, and test a well through the hydrate stability zone in northern Alaska Performers Maurer Technology, Inc.* - Project coordination with DOE Anadarko Petroleum Corporation - Overall project management for the design, construction, and operation of the Arctic Drilling Platform and mobile core lab, and field coring operations Noble Engineering and Development* - Real time data collection and

20

Major DOE Biofuels Project Locations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Biofuels Biofuels Project Locations Pacific Ethanol (Boardman, OR) BlueFire Ethanol (Corona, CA) POET (Emmetsburg, IA) Lignol Innovations (Commerce City, CO) ICM (St. Joseph, MO) Abengoa (Hugoton, KS) DOE Joint Bioenergy Institute (Berkeley, CA) DOE Great Lakes Bioenergy Research Center (Madison, WI) DOE Bioenergy Science Center (Oak Ridge, TN) NewPage (Wisconsin Rapids, WI) Range Fuels (Soperton, GA) DSM Innovation Center (Parsippany, NJ) Novozymes (Davis, CA) Genencor (Palo Alto, CA) Verenium Corp (San Diego, CA) Dupont (Wilmington, DE) Mascoma (Lebanon, NH) Cargill Inc (Minneapolis, MN) Regional Partnerships South Dakota State University, Brookings, SD Cornell University, Ithaca, NY University of Tennessee, Knoxville, TN Oklahoma State University, Stillwater, OK Oregon State University, Corvallis, OR

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE-TSPP-6, Coordination of DOE Technical Standards - July 2004 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2004 2004 DOE-TSPP-6, Coordination of DOE Technical Standards - July 2004 Technical Standards Program Procedures (TSPP) - July 26, 2004 This procedure provides guidance on the formal coordination of DOE Technical Standards in the DOE Technical Standards Program (TSP). The purpose of coordination of draft technical standards is to solicit and receive comments from interested persons and organizations in order to improve and correct technical standards. DOE Technical Standards are coordinated through the electronic RevCom for TSP process. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, integrating contractors, and laboratories (hereafter referred to collectively as "DOE Components") working to the latest revision of DOE Order 252.1, "Technical

22

Coordinator Resources | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Regional Science Bowl Coordinators » Coordinator Resources National Science Bowl® (NSB) NSB Home About National Science Bowl Contacts Regional Science Bowl Coordinators National Science Bowl FAQ's Alumni Past National Science Bowl Winners Past National Science Bowl Photos National Science Bowl Logos High School Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Regional Science Bowl Coordinators Coordinator Resources Print Text Size: A A A RSS Feeds FeedbackShare Page Here you will find information for your regional competitions.

23

DOE Hydrogen and Fuel Cells Program: External Coordination  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission and Goals Mission and Goals Organization Chart and Contacts Background Budget Timeline Program Activities Advisory Panels External Coordination U.S. Department of Energy Search help Home > About > External Coordination Printable Version External Coordination The DOE Hydrogen and Fuel Cells Program leverages the vast capabilities and experience of its stakeholders through cooperative partnerships. Coordination of these activities will be one of the keys to achieving national hydrogen and fuel cell technology program goals. Federal Agencies/Interagency Task Force A number of federal agencies support hydrogen and fuel cell research, development, demonstration, and deployment activities. There are two interagency bodies that coordinate this work: The Hydrogen and Fuel Cell Interagency Working Group (IWG) is a

24

USDA and DOE to Coordinate Research of Plant and Microbial Genomics |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Coordinate Research of Plant and Microbial Genomics to Coordinate Research of Plant and Microbial Genomics USDA and DOE to Coordinate Research of Plant and Microbial Genomics January 17, 2006 - 10:39am Addthis -- Soybean DNA to be Decoded -- WASHINGTON - The U.S. Departments of Agriculture and Energy announced Monday they will share resources and coordinate the study of plant and microbial genomics, and the Department of Energy will tackle the sequencing of the soybean genome as the first project resulting from the agreement. "This agreement demonstrates a joint commitment to support high-quality genomics research and integrated projects to meet the nation's agriculture and energy challenges," said Dr. Colien Hefferan, administrator of USDA's Cooperative State Research, Extension and Economics Service (CSREES), who

25

2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review 2014 DOE Biomass Program Integrated Biorefinery Project Comprehensive Project Review Plenary I:...

26

Tidelands DOE Project at Wilmington  

NLE Websites -- All DOE Office Websites (Extended Search)

Use browser back button to return to main text from links Use browser back button to return to main text from links Tidelands DOE Project at Wilmington : Giving an Aging Heavy Oil Giant a New Lease on Life When Ranger Petroleum Corporation of Long Beach, CA, brought in the Watson No. 2 exploratory well in January 1932, the completion yielded a flow of 150 bbl/day of clean 14 °API crude oil from pay at 3,674-784 ft. Back then, such a flow rate of low-gravity oil in a wildcat didn't exactly set the heart racing. It even took state authorities 54 months to declare the result a new field discovery. Little did they know it would evolve into one of the four largest oilfields in the United States and one of the most impressive success stories of urban oilfield development. Wilmington oilfield, the biggest in the Los Angeles Basin, extends southeast to northwest through the basin, from the middle of San Pedro Bay through the City of Long Beach and east of the Palos Verdes Peninsula. (Click here for the Wilmington field location ma.)

27

DOE Announces $14 Million Industry Partnership Projects to Increase Fuel  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces $14 Million Industry Partnership Projects to Increase DOE Announces $14 Million Industry Partnership Projects to Increase Fuel Efficiency DOE Announces $14 Million Industry Partnership Projects to Increase Fuel Efficiency May 26, 2005 - 1:02pm Addthis WASHINGTON, DC - Secretary of Energy Samuel Bodman today announced a public-private partnership between the Department of Energy, industry and academia aimed at significantly improving the vehicle efficiency of cars and trucks through advances in technology. The partnership consists of six projects with a value including cost share of over $14 million. "Achieving the goal of increased vehicle efficiency will require a coordinated approach involving government agencies, private companies and researchers. Partnerships like this will propel innovation, and

28

Roadmap to the Project: DOE Roadmap  

NLE Websites -- All DOE Office Websites (Extended Search)

Experiments List Experiments List Oral Histories Records Series Descriptions Overview Documents Declassified Documents Project Events ACHRE Report Uranium Miners Resources Building Public Trust Department of Defense Report HUMAN RADIATION EXPERIMENTS: The Department of Energy Roadmap to the Story and the Records United States Department of Energy Assistant Secretary for Environment, Safety, and Health February 1995 Contents Foreword Acknowledgments List of Photographs Chapter 1. Overview of the DOE Project Introduction Background DOE Archives and Records DOE Strategy for Finding Experiment Information Information as an Engine for Democratic Government Looking Forward Chapter 2. Narratives and Records Series Descriptions Introduction DOE Predecessor Agencies and Human Radiation Experimentsation: A Headquarters Overview

29

Major DOE Biofuels Project Locations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Feedstock, and Technology Diversity Feedstock, and Technology Diversity Pacific Ethanol Biochemical Wheat Straw/Corn Stover (Boardman, OR) Iogen Biochemical Wheat Straw (Shelly, ID) Blue Fire Biochemical Municipal Solid Waste (Corona, CA) Poet Biochemical Corn Stover (Emmetsburg, IA) Lignol Biochemical Wood Residues (Commerce City, CO) ICM Biochemical Switchgrass, Corn Stover (St. Joseph, MO) Abengoa Biochemical/ Thermo Ag Waste, Switchgrass (Hugoton, KS) DOE Joint Bioenergy Institute (Berkeley, CA) DOE Great Lakes Bioenergy Research Center (Madison, WI) DOE Bioenergy Science Center (Oak Ridge, TN) Stora Enso North America Thermochemical Wood Chips (Wisconsin Rapids, WI) Range Fuels Thermochemical Wood Chips (Soperton, GA) Alico Thermochemical/Bio Citrus Waste (LaBelle, FL) Six Commercial-Scale Biorefinergy

30

Western Electricity Coordinating Council Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Council Smart Grid Project Council Smart Grid Project Jump to: navigation, search Project Lead Western Electricity Coordinating Council Country United States Headquarters Location Salt Lake City, Utah Additional Benefit Places Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, South Dakota, Texas, Washington Recovery Act Funding $53,890,000.00 Total Project Value $107,780,000.00 Coverage Area Coverage Map: Western Electricity Coordinating Council Smart Grid Project Coordinates 40.7607793°, -111.8910474° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

31

Opportunities for Public Input Into DOE Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Opportunities for Public Input Into DOE Projects Opportunities for Public Input Into DOE Projects There are currently several DOE-proposed activities that citizens can comment on in the near future. Here is a summary of each, as well as a description of how to provide your input into the project: Hanford Draft Closure and Waste Management Environmental Impact Statement Idahoans might be interested in this document because one of the proposed actions involves sending a small amount of radioactive waste (approximately 5 cubic meters of special reactor components) to the Idaho Nuclear Technology and Engineering Center on DOE's Idaho Site for treatment. Here is a link to more information about the document: http://www.hanford.gov . A public hearing on the draft EIS will be held in Boise on Tuesday, Feb. 2 at the Owyhee Plaza Hotel. It begins at 6 p.m.

32

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

33

Major DOE Biofuels Project Locations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major DOE Biofuels Project Locations More Documents & Publications Major DOE Biofuels Project Locations Slide 1 The Current State of Technology for Cellulosic Ethanol...

34

High Level Overview of DOE Biomass Logistics II Project Activities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

High Level Overview of DOE Biomass Logistics II Project Activities High Level Overview of DOE Biomass Logistics II Project Activities Breakout Session 1B-Integration of Supply...

35

The Path to Transforming Knowledge into Energy Projects: DOE...  

Energy Savers (EERE)

The Path to Transforming Knowledge into Energy Projects: DOE Tribal Renewable Energy Webinar Series 2015 The Path to Transforming Knowledge into Energy Projects: DOE Tribal...

36

The Fuel Cell Mobile Light Project - A DOE Market Transformation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

The Fuel Cell Mobile Light Project - A DOE Market Transformation Activity The Fuel Cell Mobile Light Project - A DOE Market Transformation Activity Download the presentation slides...

37

DOE Acquisition and Project Management (APM) Glossary of Terms...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL...

38

DOE Hydrogen Analysis Repository: Projected Benefits - GPRA  

NLE Websites -- All DOE Office Websites (Extended Search)

Projected Benefits - GPRA Projected Benefits - GPRA Project Summary Full Title: Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs Project ID: 208 Principal Investigator: Michael Leifman Keywords: Energy efficiency; energy use; energy savings; renewable Purpose Assess the past and future contributions of the programs conducted by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to DOE's goals of providing affordable, clean and reliable energy. The program benefits are reported in EERE's annual Congressional Budget Request. This analysis fulfills the requirements of the Government Performance and Results Act of 1993. Performer Principal Investigator: Michael Leifman Organization: U.S. Department of Energy Address: 1000 Independence Ave., SW

39

DOE-TSPP-5-2013, Coordination of Technical Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-2013, Coordination of Technical Standards -2013, Coordination of Technical Standards DOE-TSPP-5-2013, Coordination of Technical Standards Technical Standards Program Procedures (TSPP) - September 16, 2013 This procedure provides guidance on the formal coordination of the Department of Energy (DOE) Technical Standards in the DOE Technical Standards Program (TSP). The purpose of coordination of draft DOE Technical Standards is to solicit and receive comments from interested persons and organizations in order to improve and correct DOE Technical Standards. DOE Technical Standards are coordinated through the electronic TSP RevCom process. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, integrating contractors, and laboratories (hereafter referred to collectively as TSP participants)

40

DOE Announces $14 Million Industry Partnership Projects to Increase Fuel  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Million Industry Partnership Projects to Increase 4 Million Industry Partnership Projects to Increase Fuel Efficiency DOE Announces $14 Million Industry Partnership Projects to Increase Fuel Efficiency May 26, 2005 - 1:02pm Addthis WASHINGTON, DC - Secretary of Energy Samuel Bodman today announced a public-private partnership between the Department of Energy, industry and academia aimed at significantly improving the vehicle efficiency of cars and trucks through advances in technology. The partnership consists of six projects with a value including cost share of over $14 million. "Achieving the goal of increased vehicle efficiency will require a coordinated approach involving government agencies, private companies and researchers. Partnerships like this will propel innovation, and eventually lead to a day when our children and grandchildren will call the

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Confined Zone Dispersion Project: A DOE assessment  

SciTech Connect

The goal of the US Department of Energy (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept (POC) stage. This document serves as a DOE post-project assessment of the Confined Zone Dispersion Project in CCT Round 3. In 1990, Bechtel Corporation entered into a cooperative agreement to conduct the demonstration project. The Seward Power Station of Pennsylvania Electric Company (now GPU Genco) was the host site. DOE funded 43 percent of the total project cost of $12,173,000. The project was started in June 1990 and was scheduled to be completed in June 1993. As a result of various operating problems, the schedule was extended into 1994 without additional cost to DOE. Bechtel provided the additional financing and GPU Genco provided electricity, steam, and water to operate the unit. The independent evaluation contained herein is based primarily on information from Bechtel's final technical report (1994) as well as other references cited. Confined Zone Dispersion (CZD) is a flue gas desulfurization (FGD) process that removes sulfur dioxide (SO{sub 2}). A finely atomized slurry of reactive lime, calcium hydroxide or Ca(OH){sub 2} is injected into the flue-gas duct work, between the air preheater and the second-stage ESP. The lime reacts with the SO{sub 2}, forming dry solid reaction products. The downstream ESP captures the 2 reaction products along with the fly ash entrained in the flue gas. The CZD process was demonstrated on Unit 5, a 147-MWe utility unit with two flue gas ducts. One of the ducts was extended to provide the requisite residence time and retrofitted with the CZD lime injection equipment.

NONE

1999-11-30T23:59:59.000Z

42

DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting DOE Hydrogen Program New Fuel Cell Projects Kickoff Meeting Presentation by DOE's Patrick Davis at a meeting on new fuel...

43

Healy Clean Coal Project: A DOE Assessment  

SciTech Connect

The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict environmental requirements. DOE provided $117,327,000 of the total project cost of $282,300,000, or 41.6 percent. Construction for the demonstration project was started in May 1995, and completed in November 1997. Operations were initiated in January 1998, and completed in December 1999. The evaluation contained herein is based primarily on information from the AIDEA's Final Report (Alaska Industrial Development and Export Authority, 2001), as well as other references cited.

National Energy Technology Laboratory

2003-09-01T23:59:59.000Z

44

2014 DOE Project Management Workshop Attendees List | Department...  

Energy Savers (EERE)

Attendees List 2014 DOE Project Management Workshop Attendees List 2014 PM Workshop Attendees ListName & Office.pdf More Documents & Publications Slide 1 DOE Head Contracting...

45

The Fuel Cell Mobile Light Project - A DOE Market Transformation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Mobile Light Project -- A DOE Market Transformation Activity-- Lennie Klebanoff Sandia National Laboratories Chris Radley Altergy Systems Torsten Erbel Multiquip Inc. DOE...

46

DOE executes a diverse portfolio of capital asset projects supporting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

impacting the project must be endorsed by the project's Acquisition Executive per DOE Order 413.3B (the Order). Selecting an appropriate acquisition strategy, establishing a...

47

Project Completion/Closeout Guide - DOE Directives, Delegations...  

NLE Websites -- All DOE Office Websites (Extended Search)

No Related History Exemptions Standards Related to: DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets Cancels: DOE G 413.3-16, Project...

48

DOE Completes Five Recovery Act Projects | Department of Energy  

Office of Environmental Management (EM)

Projects DOE Completes Five Recovery Act Projects August 18, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - The U.S. Department of Energy's (DOE) Environmental Management (EM) program...

49

Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned...  

Energy Savers (EERE)

Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned By: Craig H. Benson, PhD, PE Where: EM SSAB...

50

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

- Methane Hydrate Research - Geoscience Evaluations and Field Studies Last Reviewed 3/18/2013 - Methane Hydrate Research - Geoscience Evaluations and Field Studies Last Reviewed 3/18/2013 Project Goals The primary goals of the DOE/NETL Natural Gas Hydrate Field Studies (NGHFS) project are: Conduct field-based studies that advance the ability to predict, detect, characterize, and understand distribution of and controls on natural gas hydrate occurrences. Analyze geologic, geochemical, and microbiologic data for indications of past and current changes to the stability of natural gas hydrate in marine settings. Develop links between the U.S. Gas Hydrate Program and international R&D efforts through direct participation in international field programs and workshops. Evaluate the potential role natural gas hydrates may play in the global carbon cycle through analysis of modern and paleo-natural gas

51

NETL: Clean Coal Demonstrations - Post-Project (DOE) Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Assessments DOE Assessments Clean Coal Demonstrations DOE Post-Project Assessments DOE Assessment of the Clean Coal Diesel Demonstration Project [PDF-590KB] DOE Assessment of the JEA Large-Scale CFB Combustion Demonstration Project [PDF-177KB] DOE Assessment of the Advanced Coal Conversion Process Demonstration [PDF-649KB] DOE Assessment of the Tampa Electric Integrated Gasification Combined-Cycle Demonstration Project [PDF-550KB] 500-MW Demonstration of Advanced Wall-Fired Combustion Techniques for the Reduction of Nitrogen Oxide (NOx) Emissions from Coal- Fired Boilers: A DOE Assessment [PDF-921KB] Commercial-Scale Demonstration of the Liquid Phase Methanol (LPMEOH™) Process [PDF-382KB] Healy Clean Coal Project: A DOE Assessment [PDF-713KB] Pulse Combustor Design: A DOE Assessment [PDF-569KB]

52

project information | netl.doe.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

International Activity Project Information Project Portfolio Publications Coal Gasification Magazine Solicitations Coal-Biomass Feed and Gasification Agreement Number Project...

53

2013 Annual DOE-NE Materials Research Coordination Meeting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Annual DOE-NE Materials Research Coordination Meeting 2013 Annual DOE-NE Materials Research Coordination Meeting 2013 Annual DOE-NE Materials Research Coordination Meeting The Reactor Materials element of the Nuclear Energy Enabling Technologies (NEET) program conducted its FY 2013 coordination meeting as a series of four web-conferences to act as a forum for the nuclear materials research community. The purpose of this meeting was to report on current and planned nuclear materials research, identify new areas of collaboration and promote greater coordination among the various Office of Nuclear Energy (NE) programs. Currently, materials research is performed in several NE programs, including NE Advanced Modeling and Simulation (NEAMS), Fuel Cycle Research and Development (FCRD), Advanced Reactor Technologies

54

2013 Annual DOE-NE Materials Research Coordination Meeting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Annual DOE-NE Materials Research Coordination Meeting 2013 Annual DOE-NE Materials Research Coordination Meeting 2013 Annual DOE-NE Materials Research Coordination Meeting The Reactor Materials element of the Nuclear Energy Enabling Technologies (NEET) program conducted its FY 2013 coordination meeting as a series of four web-conferences to act as a forum for the nuclear materials research community. The purpose of this meeting was to report on current and planned nuclear materials research, identify new areas of collaboration and promote greater coordination among the various Office of Nuclear Energy (NE) programs. Currently, materials research is performed in several NE programs, including NE Advanced Modeling and Simulation (NEAMS), Fuel Cycle Research and Development (FCRD), Advanced Reactor Technologies

55

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterizing Arctic Hydrates (Canadian Test Well and Alaskan "Wells of Opportunity") Characterizing Arctic Hydrates (Canadian Test Well and Alaskan "Wells of Opportunity") photo of drilling rig at Mallik 2L-38 location Rig at Mallik 2L-38 location courtesy Geological Survey of Canada DE-AT26-97FT34342 Goal The purpose of this project is to assess the recoverability and potential production characteristics of the onshore natural gas hydrate and associated free-gas accumulations in the Arctic of North America Performer United States Geological Survey, Denver, Colorado 80225 - partner in GSC-managed consortium and provide expertise in data gathering and analysis Background The U.S. Geological Survey has been participating in natural gas hydrate reservoir research with DOE NETL through an interagency agreement which began in the early 1980’s. The work has been an ongoing effort as part of

56

Mr. Carl Spreng RFLMA Project Coordinator HMWMD-B2  

Office of Legacy Management (LM)

Spreng Spreng RFLMA Project Coordinator HMWMD-B2 Department of Energy Washington , DC 20585 September 9, 2013 Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South Denver, CO 80246-1530 Subject: Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Reference: Rocky Flats Legacy Management Agreement (RFLMA) Attachment 2, Section 5.1, "Monitoring Requirements" Dear Mr. Spreng: In accordance with the criteria provided in Section 5.1 of RFLMA Attachment 2, this is to certify that surface water monitoring location WOMPOC has been functioning as an RFLMA POC for 2 years and now replaces surface water monitoring location GS01 as the POC. This notification completes the process to remove the RFLMA Attachment 2 requirement for monitoring at GSO 1.

57

DOE-TSPP-4, Registering a Technical Standard Project - August...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 1, 2000 DOE-TSPP-4, Registering a Technical Standard Project - August 1, 2000 Technical Standards Program Procedures (TSPP) This procedure outlines the process for...

58

DOE EM Project Experience & Lessons Learned for In Situ Decommissionin...  

Office of Environmental Management (EM)

"DOE EM Project Experience & Lessons Learned for In Situ Decommissioning" report is to capture the considerable technical experience gained to date for implementation of In Situ...

59

DOE/NSF Thermoelectric Partnership Project SEEBECK Saving Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Research and Sharing Knowledge DOENSF Thermoelectric Partnership Project SEEBECK Saving Energy Effectively By Engaging in Collaborative Research and Sharing Knowledge 2012 DOE...

60

DOE/NSF Thermoelectric Partnership Project SEEBECK Saving Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

research and sharing Knowledge DOENSF Thermoelectric Partnership Project SEEBECK Saving Energy Effectively By Engaging in Collaborative research and sharing Knowledge 2011 DOE...

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

High Level Overview of DOE Biomass Logistics II Project Activities  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

High Level Overview of DOE Biomass Logistics II Project Activities Biomass 2014: Growing the Future Bioeconomy Washington, DC July 29, 2014 Presented By: Kevin Comer, Associate...

62

SC Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Projects Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Projects Print Text Size: A A A RSS Feeds FeedbackShare Page SC Projects-Contains information regarding SC projects including project review dates, information on Office of Science Certified Federal Project Directors and Defining the Leadership Traits/Skill Set for a Successful Federal Project Director, and project photos or links to project photo sites. Last modified: 3/18/2013 10:54:36

63

DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivery High-Pressure Tanks and Analysis Project Review Meeting DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting On February 8-9, 2005, the Department...

64

DOE-STD-1050-93; DOE Standard Guideline to Good Practices For Planning, Scheduling, and Coordination of Maintenance at DOE Nuclear Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-93 0-93 March 1993 DOE STANDARD GUIDELINE TO GOOD PRACTICES FOR PLANNING, SCHEDULING, AND COORDINATION OF MAINTENANCE AT DOE NUCLEAR FACILITIES U.S. Department of Energy AREA MNTY Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62 Oak Ridge, TN 37831. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161. Order No. DE93014266 DOE-STD-1050-93 FOREWORD The purpose of the Guideline to Good Practices for Planning, Scheduling, and Coordination of M aintenance at DOE Nuclear Facilities is to provide contractor maintenance

65

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

If you need help finding information on a particular project, please contact the content manager. If you need help finding information on a particular project, please contact the content manager. Search Hydrates Projects Active Projects | Completed Projects Click on project number for a more detailed description of the project. Project Number Project Name Primary Performer DE-FC26-01NT41332 Alaska North Slope Gas Hydrate Reservoir Characterization BP Exploration Alaska, Inc. DE-FC26-01NT41330 Characterizing Natural Gas Hydrates in the Deep Water Gulf of Mexico: Applications for Safe Exploration Chevron Energy Technology Company DE-FE0009897 Hydrate-Bearing Clayey Sediments: Morphology, Physical Properties, Production and Engineering/Geological Implications Georgia Tech Research Corporation DE-FE0009904 Structural and Stratigraphic Controls on Methane Hydrate Occurrence and Distribution: Gulf of Mexico, Walker Ridge 313 and Green Canyon 955 Oklahoma State University

66

major-projects | netl.doe.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Major Gasification Projects News Gasifipedia Gasifier Optimization Feed Systems Syngas Processing Systems Analyses Gasification Plant Databases International Activity Program Plan...

67

DOE Office of Indian Energy Renewable Energy Project Development Training: Tools and Information You Can Use  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Project Development Training: Curriculum Overview National Congress of American Indians Annual Meeting: November 1, 2011 Tracey A. LeBeau, Director, DOE Office of Indian Energy Pilar Thomas, Deputy Director, DOE Office of Indian Energy Dan Beckley, Jeff Bedard, and Liz Doris, National Renewable Energy Laboratory Matt Ferguson and Joe Cruz, The Reznick Group DOE Office of Indian Energy Mission: Direct, foster, coordinate, and implement energy planning, education, management, and programs that assist tribes with energy development, capacity building, energy infrastructure, energy costs, and electrification of Indian lands and homes. Why Are We Here? Indian Country contains a significant portion of United States energy resources

68

DOE Financial Assistance Awards: Active Project Management  

Energy.gov (U.S. Department of Energy (DOE))

Presented during the May 15 working lunch session at the 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting

69

DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Contractor for Depleted Hexafluoride Conversion Project DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support March 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a competitive small business task order to Navarro Research and Engineering Inc. of Oak Ridge, Tennessee. The award is a $22 million, time and materials task order with a three-year performance period and two one-year extension options. Navarro Research and Engineering Inc. will provide engineering and operations technical support services to the DOE Portsmouth Paducah Project Office (PPPO) in Lexington, Kentucky and the Depleted Uranium Hexafluoride (DUF6) Conversion Project in Paducah, Kentucky and Portsmouth, Ohio.

70

Geologic Carbon Dioxide Storage Field Projects Supported by DOE's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geologic Carbon Dioxide Storage Field Projects Supported by DOE's Geologic Carbon Dioxide Storage Field Projects Supported by DOE's Sequestration Program Geologic Carbon Dioxide Storage Field Projects Supported by DOE's Sequestration Program Background: The U.S. DOE's Sequestration Program began with a small appropriation of $1M in 1997 and has grown to be the largest most comprehensive CCS R&D program in the world. The U.S. DOE's sequestration program has supported a number of projects implementing CO2 injection in the United States and other countries including, Canada, Algeria, Norway, Australia, and Germany. The program has also been supporting a number of complementary R&D projects investigating the science of storage, simulation, risk assessment, and monitoring the fate of the injected CO2 in the subsurface.

71

Guideline to good practices for planning, scheduling, and coordination of maintenance at DOE nuclear facilities  

SciTech Connect

The purpose of the Guideline to Good Practices for Planning, Scheduling, and Coordination of Maintenance at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a rigorously controlled maintenance program directed at planning, scheduling, and coordinating work packages for maintenance tasks at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 6. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

72

U.S. DOE Technical Assistance Project | Open Energy Information  

Open Energy Info (EERE)

U.S. DOE Technical Assistance Project U.S. DOE Technical Assistance Project Jump to: navigation, search Logo: Technical Assistance Project Name Technical Assistance Project Agency/Company /Organization U.S. Department of Energy Sector Energy Focus Area Energy Efficiency Website http://apps1.eere.energy.gov/w References Program Homepage[1] Abstract The Technical Assistance Project, or TAP, is a program which provides "state and local officials with quick, short-term access to experts at U.S. Department of Energy (DOE) National Laboratories for assistance with their renewable energy and energy efficiency policies and programs. The Technical Assistance Project, or TAP, is a program which provides "state and local officials with quick, short-term access to experts at U.S. Department of Energy (DOE) National Laboratories for assistance with their

73

Completed Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Completed Projects Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Completed Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of completed SC projects Advanced Photon Source External link Building 51 and Bevatron D&D .pdf file (1.1MB) LHC ATLAS .pdf file (322KB) LHC CMS .pdf file (166KB) Linac Coherent Light Source .pdf file (4.6MB)

74

Ongoing Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Projects Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of current SC Projects 12 GeV CEBAF Upgrade .pdf file (3.2MB) Daya Bay .pdf file (1.0MB) National Spherical Torus Experiment (NSTX) .pdf file (841KB) National Synchrotron Light Source II (NSLS II) .pdf file (6.4MB)

75

DOE/EIS-0456 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 CUSHMAN HYDROELECTRIC PROJECT MASON COUNTY, WASHINGTON (FERC PROJECT NO. 460) FINAL ENVIRONMENTAL IMPACT STATEMENT (FERC/EIS-0095F, ADOPTED AS DOE/EIS-0456) US Department of Energy OCTOBER 2010 Lead Agency: U.S. Department of Energy (DOE) Title: Final Environmental Impact Statement (FEIS) for the Cushman Hydroelectric Project, Mason County, Washington (Adopted) Contact: For additional copies or more information on this final environmental impact statement (EIS), please

76

Project Management Guide for DOE appraisals  

SciTech Connect

This guide defines a process to provide exemplary support to a DOE assessment team and highlights ``lessons learned`` from the first TSA of the Kansas City Plant which was performed April 21--April 30, 1992. DOE currently plans to conduct TSAs annually at the KCD. This guide can be used to prepare for future Tiger Team Reviews, TSAS, or ES&H Progress Assessments. The guide will be modified periodically to reflect improvements in the appraisal management process as the DOE appraisal process evolves. The process, or portions thereof, described in this manual is expected to be applicable to managing a Conduct of Operations Assessment.

Bendure, A.O. [Sandia National Labs., Albuquerque, NM (United States); Bowers, J.L.; Daniel, V.R.; Renfrow, R.M. [Allied-Signal Aerospace Co., Kansas City, MO (United States). Kansas City Div.

1993-04-01T23:59:59.000Z

77

Project Management Guide for DOE appraisals  

SciTech Connect

This guide defines a process to provide exemplary support to a DOE assessment team and highlights lessons learned'' from the first TSA of the Kansas City Plant which was performed April 21--April 30, 1992. DOE currently plans to conduct TSAs annually at the KCD. This guide can be used to prepare for future Tiger Team Reviews, TSAS, or ES H Progress Assessments. The guide will be modified periodically to reflect improvements in the appraisal management process as the DOE appraisal process evolves. The process, or portions thereof, described in this manual is expected to be applicable to managing a Conduct of Operations Assessment.

Bendure, A.O. (Sandia National Labs., Albuquerque, NM (United States)); Bowers, J.L.; Daniel, V.R.; Renfrow, R.M. (Allied-Signal Aerospace Co., Kansas City, MO (United States). Kansas City Div.)

1993-04-01T23:59:59.000Z

78

2014 DOE Project Management Workshop Presentations | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1. PM Update - Paul Bosco, Director, Office of Acquisition & Project Management 2. Ethics - Marianne Jennings, W.P. Carey School of Business at Arizona State University 3....

79

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

80

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Applicant DOE Award Project Location Project Focus Feasibility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and hot water systems, install insulated exterior doors, increase lighting efficiency, seal air leaks, and implement other energy efficiency, cost-saving measures. Applicant DOE...

82

Seven Projects Aimed at Advancing Coal Research Selected for DOE's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seven Projects Aimed at Advancing Coal Research Selected for DOE's Seven Projects Aimed at Advancing Coal Research Selected for DOE's University Coal Research Program Seven Projects Aimed at Advancing Coal Research Selected for DOE's University Coal Research Program May 13, 2010 - 1:00pm Addthis Washington, DC -- Seven projects aimed at advancing coal research and development while providing research exposure to a new generation of scientists and engineers have been selected to participate in the U.S. Department of Energy's (DOE) University Coal Research (UCR) program. The projects aim to improve the basic understanding of the chemical and physical processes that govern coal conversion and utilization, by-product utilization, and technological development for advanced energy systems. These advanced systems -- efficient, ultra-clean energy plants -- are

83

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Thermal Properties of Hydrate – Tool Development Last Reviewed 3/18/2013 Thermal Properties of Hydrate – Tool Development Last Reviewed 3/18/2013 Project Goal The goal of this project is increased understanding of gas hydrate thermal properties through measurements on natural hydrate-bearing sediment cores and hydrate-bearing cores formed within laboratory pressure vessels. Project Performers Eilis Rosenbaum, NETL, Office of Research and Development Ronald Lynn, NETL, RDS/Parsons Dr. David Shaw, Geneva College Project Location National Energy Technology Laboratory, Pittsburgh, PA Background NETL utilizes a modified transient plane source (TPS) shown in Figure 1 using a technique originally developed by Gustafsson [1, 2] in a single-sided configuration (Figure 2). The TPS technique is capable of simultaneously determining both thermal conductivity and thermal

84

Applicant DOE Award Project Location Project Focus Feasibility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Authority (THRHA) 898,772 Juneau, AK The project will provide energy assessments, alternative energy monitoring, and energy conservation upgrades for low-income,...

85

DOE Announces Webinars on Resources for Tribal Energy Efficiency Projects,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces Webinars on Resources for Tribal Energy Efficiency DOE Announces Webinars on Resources for Tribal Energy Efficiency Projects, Deep Energy Retrofits and More DOE Announces Webinars on Resources for Tribal Energy Efficiency Projects, Deep Energy Retrofits and More November 26, 2013 - 4:16pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however, advanced registration is typically required. You can also watch archived webinars and browse previously aired videos, slides, and transcripts. Upcoming Webinars November 27: Webinar on Available Resources for Tribal Energy Project Development Webinar Sponsors: DOE Office of Indian Energy Policy and Programs The U.S. Department of Energy (DOE) Office of Indian Energy, EERE's

86

DOE Completes Large-Scale Carbon Sequestration Project Awards | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Completes Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards November 17, 2008 - 4:58pm Addthis Regional Partner to Demonstrate Safe and Permanent Storage of 2 Million Tons of CO2 at Wyoming Site WASHINGTON, DC - Completing a series of awards through its Regional Carbon Sequestration Partnership Program, the U.S. Department of Energy (DOE) today awarded $66.9 million to the Big Sky Regional Carbon Sequestration Partnership for the Department's seventh large-scale carbon sequestration project. Led by Montana State University-Bozeman, the Partnership will conduct a large-volume test in the Nugget Sandstone formation to demonstrate the ability of a geologic formation to safely, permanently and economically

87

DOE RFP Seeks Projects for Improving Environmental Performance of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE RFP Seeks Projects for Improving Environmental Performance of DOE RFP Seeks Projects for Improving Environmental Performance of Unconventional Natural Gas Technologies DOE RFP Seeks Projects for Improving Environmental Performance of Unconventional Natural Gas Technologies December 21, 2011 - 12:00pm Addthis Washington, DC - Research projects to study ways for improving the environmental performance of unconventional gas development are being sought by the National Energy Technology Laboratory (NETL), a facility of the U.S. Department of Energy's (DOE) Office of Fossil Energy. The research opportunity was released in a request for proposals (RFP) issued by NETL's contractor, the Research Partnership to Secure Energy for America (RPSEA), with a deadline of March 6, 2012. A second RFP, focusing on the needs of small oil and natural gas producers, was released

88

High Level Overview of DOE Biomass Logistics II Project Activities  

Energy.gov (U.S. Department of Energy (DOE))

Breakout Session 1BIntegration of Supply Chains I: Breaking Down Barriers High Level Overview of DOE Biomass Logistics II Project Activities Kevin Comer, Associate Principal, Antares Group Inc.

89

DOE awards contract to small business for mercury project at...  

Energy Savers (EERE)

to small business for mercury project at Y-12 February 28, 2014 - 12:00pm Addthis OAK RIDGE, Tenn. - On Feb. 26, the U.S. Department of Energy's (DOE) Oak Ridge Office of...

90

DOE Announces $2 Million Funding for Methane Hydrates Projects | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces $2 Million Funding for Methane Hydrates Projects DOE Announces $2 Million Funding for Methane Hydrates Projects DOE Announces $2 Million Funding for Methane Hydrates Projects November 7, 2005 - 12:43pm Addthis Seeks to Unlock World's Biggest Potential Source of "Ice That Burns" WASHINGTON, DC - The Department of Energy (DOE) today announced a total of $2 million in funding to five research projects that will assess the energy potential, safety, and environmental aspects of methane hydrate exploration and development. Termed the "ice that burns," methane hydrates are crystalline solids that release a flammable gas when melted. They are considered the Earth's biggest potential source of hydrocarbon energy and could be a key element in meeting natural gas demand in the United States,

91

DOE Robotics Project. Summary of progress for 1991  

SciTech Connect

This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

Not Available

1991-01-01T23:59:59.000Z

92

DOE Awards Supercomputer Access to Cutting-Edge Projects | U.S. DOE Office  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Awards DOE Awards Supercomputer Access to Cutting-Edge Projects News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.18.08 DOE Awards Supercomputer Access to Cutting-Edge Projects Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science announced today that 66 projects addressing some of the greatest scientific challenges have been awarded access to some of the world's most powerful supercomputers at DOE national laboratories. The projects-competitively selected for their technical readiness and scientific merit-will advance research in key areas such as astrophysics,

93

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Numerical Simulation Last Reviewed 3/8/2013 Numerical Simulation Last Reviewed 3/8/2013 Project Goal The goal of NETL's gas hydrate numerical simulation studies is to obtain pertinent, high-quality information on the behavior of gas hydrates in their natural environment under either production (methane gas extraction) or climate change scenarios. This research is closely linked with NETL's experimental and field studies programs to ensure the validity of input datasets and scenarios. Project Performers Brian Anderson, NETL/RUA Fellow (West Virginia University) Hema Siriwardane, NETL/RUA Fellow (West Virginia University) Eugene Myshakin, NETL/URS Project Locations National Energy Technology Laboratory, Pittsburgh PA, and Morgantown WV West Virginia University, Morgantown, WV Background Field-scale hydrate production tests rely heavily on reservoir-scale

94

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterization of Natural Hydrate Bearing Sediments and Hydrate Dissociation Kinetics Last Reviewed 12/6/2013 Characterization of Natural Hydrate Bearing Sediments and Hydrate Dissociation Kinetics Last Reviewed 12/6/2013 FWP-45133 Work conducted under this field work proposal (FWP) includes two distinct phases. Ongoing Phase 2 work is discussed directly below. Click here to review the completed, Phase 1 work, associated with this FWP. Phase 2 Project Information Characterization of Natural Hydrate Bearing Core Samples Goal The overarching goal of this project is to gain an improved understanding of the dynamic processes of gas hydrate accumulations in geologic media by combining laboratory studies, numerical simulation, and analysis of shipboard infrared imaging of hydrate core samples. This project comprises four principal components: (1) fundamental laboratory investigations, (2)

95

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Gulf of Mexico Gas Hydrates Sea-floor Observatory Project Last Reviewed 12/18/2013 Gulf of Mexico Gas Hydrates Sea-floor Observatory Project Last Reviewed 12/18/2013 DE-FE26-06NT42877, DE-FC26-02NT41628, and DE-FC26-00NT40920 Goal The goal of this project is to conduct activities leading to the development, implementation, and operation of a remote, multi-sensor seafloor observatory focused on behavior of the marine hydrocarbon system within the gas hydrate stability zone of the deepwater Gulf of Mexico and analysis of data resultant from that observatory over time. Attaining this goal will lead to an enhanced understanding of the role the hydrocarbon system plays in the environment surrounding the site. Investigations include physical, chemical, and microbiological studies. Models developed from these studies are designed to provide a better understanding of gas

96

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

– Formation and Dissociation of Methane Hydrates Last Reviewed 07/7/2011 – Formation and Dissociation of Methane Hydrates Last Reviewed 07/7/2011 Project Objective Observe hydrate formation and dissociation phenomena in various porous media and characterize hydrate-bearing sediments by estimating physical properties (kinetic parameters for hydrate formation and dissociation, thermal conductivity, permeability, relative permeability, and mechanical strength) to enhance fundamental understanding on hydrate formation and accumulation and to support numerical simulations and potential gas hydrate production Project Performers Yongkoo Seol – NETL Office of Research & Development Jeong Choi – Oak Ridge Institute for Science and Education Jongho Cha-Virginia Polytech Institute Project Location National Energy Technology Laboratory - Morgantown, West Virginia

97

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Phase 1 - Characterization and Qualification of the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields Phase 1 - Characterization and Qualification of the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields DE-FC26-06NT42962 Goal The goal of this project is to characterize and quantify the postulated gas hydrate resource associated with the Barrow Gas Fields – three producing fields located in a permafrost region near Barrow, the North Slope's biggest population center and economic hub. Map of the North Slope Borough showing the location of its eight major communities, including Barrow, the site of this research project. Map of the North Slope Borough showing the location of its eight major communities, including Barrow, the site of this research project. Performers North Slope Borough, Barrow, Alaska (North Slope Borough) 99723

98

PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROJECT SELECTIONS FOR DOE PHASE III XLERATOR SMALL BUSINESS PROGRAM Biomass Technologies: Harvesting/Dewatering Technology for Algal Biofuels Renewable Algal Energy, LLC (Kingsport, Tenn.) - Algal Biodiesel via Innovative Harvesting and Aquaculture Systems - Renewable Algal Energy LLC, will leverage its experience in algal aquaculture, harvesting, and extraction, to demonstrate at small commercial-scale, improved, low cost, energy-efficient methods for harvesting and

99

DOE Projects to Advance Environmental Science and Technology | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Projects to Advance Environmental Science and Technology DOE Projects to Advance Environmental Science and Technology DOE Projects to Advance Environmental Science and Technology August 19, 2009 - 1:00pm Addthis Washington, DC - The Office of Fossil Energy's National Energy Technology Laboratory (NETL) has selected nine new projects targeting environmental tools and technology for shale gas and coalbed methane (CBM) production. NETL's goals for these projects are to improve management of water resources, water usage, and water disposal, and to support science that will aid the regulatory and permitting processes required for shale gas development. A primary goal of Fossil Energy's Oil and Natural Gas Program is to enhance the responsible development of domestic natural gas and oil resources that supply the country's energy. A specific objective is to accelerate the

100

DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor for Depleted Hexafluoride Conversion Project Contractor for Depleted Hexafluoride Conversion Project Support DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support March 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a competitive small business task order to Navarro Research and Engineering Inc. of Oak Ridge, Tennessee. The award is a $22 million, time and materials task order with a three-year performance period and two one-year extension options. Navarro Research and Engineering Inc. will provide engineering and operations technical support services to the DOE Portsmouth Paducah Project Office (PPPO) in Lexington, Kentucky and the Depleted Uranium Hexafluoride (DUF6) Conversion Project in Paducah, Kentucky and Portsmouth, Ohio.

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE Community-/Facility-Scale Tribal Renewable Energy Project Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Community-/Facility-Scale Tribal Renewable Energy Project DOE Community-/Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop DOE Community-/Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop September 18, 2013 (All day) to September 20, 2013 (All day) This interactive workshop will walk participants through five steps to help tribes understand the process for and potential pitfalls of developing community- and facility-scale renewable energy projects. Attendees will learn how the development of a renewable energy project could further a tribe's goals, and hear from other tribes about their experiences. This workshop is specifically designed for, and limited to, elected tribal leaders and tribal executives, accountants, and attorneys interested in gaining knowledge and confidence to develop community- and facility-scale

102

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Gulf of Mexico Gas Hydrates Joint Industry Project (JIP) Characterizing Natural Gas Hydrates in the Deep Water Gulf of Mexico - Applications for Safe Exploration and Production Last Reviewed 12/18/2013 Gulf of Mexico Gas Hydrates Joint Industry Project (JIP) Characterizing Natural Gas Hydrates in the Deep Water Gulf of Mexico - Applications for Safe Exploration and Production Last Reviewed 12/18/2013 DE-FC26-01NT41330 Goal: The goal of this project is to develop technology and collect data to assist in the characterization of naturally occurring gas hydrates in the deep water Gulf of Mexico (GoM). The intent of the project is to better understand the impact of hydrates on safety and seafloor stability as well as provide data for use by scientists in their study of climate change and assessment of the feasibility of marine hydrate as a potential future energy resource. Photo of the Helix Q4000 The Semi-Submersible Helix Q4000 used on the 21 day JIP Leg II Drilling and Logging Expedition

103

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

In Situ Sampling and Characterization of Naturally Occurring Methane Hydrate Using the D/V JOIDES Resolution Last Reviewed 02/05/2010 In Situ Sampling and Characterization of Naturally Occurring Methane Hydrate Using the D/V JOIDES Resolution Last Reviewed 02/05/2010 DE-FC26-01NT41329 photo of a man showing the pressure core sampler on the deck of JOIDES Resolution Pressure core sampler on deck courtesy Texas A&M University Goal The goal of the project was to characterize hydrate accumulation at Hydrate Ridge (offshore Oregon) and improve the ability to use geophysical and subsurface logging to identify hydrates. A follow-on goal was to characterize hydrate accumulation at offshore Vancouver Island, BC, Canada. Background This project focused on physically verifying the existence of hydrates at Hydrate Ridge through the collection of pressurized and non-pressurized core samples and logging data. This study developed and tested tools to

104

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Interrelation of Global Climate and the Response of Oceanic Hydrate Accumulations Last Reviewed 8/21/2013 Interrelation of Global Climate and the Response of Oceanic Hydrate Accumulations Last Reviewed 8/21/2013 Field Work Proposals: ESD07-014 (LBNL) and 08FE-003 (LANL) Project Goal The primary objectives of this project are to: 1) investigate the effect of rising water temperatures on the stability of oceanic hydrate accumulations, 2) estimate the global quantity of hydrate-originating carbon that could reach the upper atmosphere as CH4 or CO2 thus affecting global climate, 3) quantify the interrelationship between global climate and the amount of hydrate-derived carbon reaching the upper atmosphere focusing on the potential link between hydrate dissociation and cascading global warming and 4) test the discharge phase of the Clathrate Gun Hypothesis which stipulates large-scale hydrate dissociation and gas

105

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Petrophysical Characterization and Reservoir Simulator for Gas Hydrate Production and Hazard Avoidance in the Gulf of Mexico Petrophysical Characterization and Reservoir Simulator for Gas Hydrate Production and Hazard Avoidance in the Gulf of Mexico DE-FC26-02NT41327 Goal The project goal was to develop new methodologies to characterize the physical properties of methane hydrate and hydrate sediment systems. Performers Westport Technology Center International - Houston, TX University of Houston - Houston, TX Results Project researchers created a pressure cell for measuring acoustic velocity and resistivity on hydrate-sediment cores. They utilized the measurements for input to an existing reservoir model for evaluating possible offshore hydrate accumulations. The organization of an industry-led Advisory Board and the development of a Research Management Plan have been completed. The development of a handbook for transporting, preserving, and storing hydrate core samples brought from the field to the laboratory was completed and distributed for review by industry and researchers.

106

DOE Hydrogen Analysis Repository: Hydrogen Modeling Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Modeling Projects Modeling Projects Below are models grouped by topic. These models are used to analyze hydrogen technology, infrastructure, and other areas related to the development and use of hydrogen. Cross-Cutting Distributed Energy Resources Customer Adoption Model (DER_CAM) Hydrogen Deployment System (HyDS) Model and Analysis Hydrogen Technology Assessment and Selection Model (HyTASM) Renewable Energy Power System Modular Simulator (RPM-Sim) Stranded Biogas Decision Tool for Fuel Cell Co-Production Energy Infrastructure All Modular Industry Growth Assessment (AMIGA) Model Building Energy Optimization (BEopt) Distributed Energy Resources Customer Adoption Model (DER_CAM) Hydrogen Deployment System (HyDS) Model and Analysis Hydrogen Technology Assessment and Selection Model (HyTASM)

107

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life  

E-Print Network (OSTI)

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life Cycle Reimbursable Funding: http://www.ornl.gov/wfo/exthome.htm October 11, 2010 #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT Project Closeout Process Summary #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY 3 Secretary

108

Milliken Clean Coal Demonstration Project: A DOE Assessment  

SciTech Connect

The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

National Energy Technology Laboratory

2001-08-15T23:59:59.000Z

109

DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) recently released a report finding that inter-regional cooperation can help lower the cost of transporting wind energy from windy areas in the Midwest and South-Central United States to areas with less wind generation capability in the Southeastern United States, improving the ability to meet our nation's electricity demand using clean resources. DOE awarded the Electric Power Research Institute (EPRI) and LCG Consulting an American Recovery and Reinvestment Act (ARRA) grant to evaluate the benefits of coordinating inter-regional transfers of wind energy.

110

TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153  

SciTech Connect

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

2008-12-12T23:59:59.000Z

111

DOE Signs Cooperative Agreement for Carbon Capture Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Signs Cooperative Agreement for Carbon Capture Project Signs Cooperative Agreement for Carbon Capture Project DOE Signs Cooperative Agreement for Carbon Capture Project June 18, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has signed a cooperative agreement with NRG Energy Inc. (NRG) for the Parish Post-Combustion CO2 Capture and Sequestration Project to design, construct, and operate a system that will capture and store approximately 400,000 tons of carbon dioxide (CO2) per year. The project, which will be managed by the Office of Fossil Energy's National Energy Technology Laboratory, was selected under DOE's Clean Coal Power Initiative, a collaboration between the federal government and private industry working toward low-emission, coal-based power generation technology. The project team aims to demonstrate that post-combustion carbon capture

112

DOE Signs Cooperative Agreement for Carbon Capture Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Signs Cooperative Agreement for Carbon Capture Project Signs Cooperative Agreement for Carbon Capture Project DOE Signs Cooperative Agreement for Carbon Capture Project June 18, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has signed a cooperative agreement with NRG Energy Inc. (NRG) for the Parish Post-Combustion CO2 Capture and Sequestration Project to design, construct, and operate a system that will capture and store approximately 400,000 tons of carbon dioxide (CO2) per year. The project, which will be managed by the Office of Fossil Energy's National Energy Technology Laboratory, was selected under DOE's Clean Coal Power Initiative, a collaboration between the federal government and private industry working toward low-emission, coal-based power generation technology. The project team aims to demonstrate that post-combustion carbon capture

113

DOE Awards First Three Large-Scale Carbon Sequestration Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Three Large-Scale Carbon Sequestration Projects First Three Large-Scale Carbon Sequestration Projects DOE Awards First Three Large-Scale Carbon Sequestration Projects October 9, 2007 - 3:14pm Addthis U.S. Projects Total $318 Million and Further President Bush's Initiatives to Advance Clean Energy Technologies to Confront Climate Change WASHINGTON, DC - In a major step forward for demonstrating the promise of clean energy technology, U.S Deputy Secretary of Energy Clay Sell today announced that the Department of Energy (DOE) awarded the first three large-scale carbon sequestration projects in the United States and the largest single set in the world to date. The three projects - Plains Carbon Dioxide Reduction Partnership; Southeast Regional Carbon Sequestration Partnership; and Southwest Regional Partnership for Carbon

114

The Human Microbiome Project (HMP) and the Data Analysis and Coordination Center (DAAC) portal to the HMP (GSC8 Meeting)  

SciTech Connect

The Genomic Standards Consortium was formed in September 2005. It is an international, open-membership working body which promotes standardization in the description of genomes and the exchange and integration of genomic data. The 2009 meeting was an activity of a five-year funding "Research Coordination Network" from the National Science Foundation and was organized held at the DOE Joint Genome Institute with organizational support provided by the JGI and by the University of California - San Diego. George Weinstock from Washington University School of Medicine talks about the Human Microbiome Project (HMP) followed briefly by Jennifer Wortman from the University of Maryland School of Medicine on the Data Analysis and Coordination Center (DACC) portal to the HMP at the Genomic Standards Consortium's 8th meeting at the DOE JGI in Walnut Creek, Calif. on Sept. 9, 2009.

Weinstock, George [Washington University School of Medicine] [Washington University School of Medicine; Wortman, Jennifer [University of Maryland School of Medicine] [University of Maryland School of Medicine

2009-09-09T23:59:59.000Z

115

DOE Awards Contract for Decontamination & Decommissioning Project for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Awards Contract for Decontamination & Decommissioning Project DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park April 29, 2011 - 12:00pm Addthis Media Contact Mike Koentop (865) 576-0885 www.oakridge.doe.gov Oak Ridge, Tenn. - As part of its ongoing commitment to cleaning up the legacy of the Cold War at sites across the weapons complex, the U.S. Department of Energy has awarded a contract for the remaining environmental cleanup at the East Tennessee Technology Park (ETTP) to URS | CH2M Oak Ridge, LLC. The $2.2 billion contract will complete cleanup and provide support functions at ETTP, while supporting local jobs and area small businesses. "Today's contract announcement means that we can continue to meet our

116

DOE-Supported Project Advances Clean Coal, Carbon Capture Technology |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Supported Project Advances Clean Coal, Carbon Capture DOE-Supported Project Advances Clean Coal, Carbon Capture Technology DOE-Supported Project Advances Clean Coal, Carbon Capture Technology January 29, 2013 - 12:00pm Addthis Washington, DC - Researchers at The Ohio State University (OSU) have successfully completed more than 200 hours of continuous operation of their patented Coal-Direct Chemical Looping (CDCL) technology - a one-step process to produce both electric power and high-purity carbon dioxide (CO2). The test, led by OSU Professor Liang-Shih Fan, represents the longest integrated operation of chemical looping technology anywhere in the world to date. The test was conducted at OSU's 25 kilowatt thermal (kWt) CDCL combustion sub-pilot unit under the auspices of DOE's Carbon Capture Program, which is developing innovative environmental control technologies to foster the

117

DOE-Supported Project Advances Clean Coal, Carbon Capture Technology |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Supported Project Advances Clean Coal, Carbon Capture DOE-Supported Project Advances Clean Coal, Carbon Capture Technology DOE-Supported Project Advances Clean Coal, Carbon Capture Technology January 29, 2013 - 12:00pm Addthis Washington, DC - Researchers at The Ohio State University (OSU) have successfully completed more than 200 hours of continuous operation of their patented Coal-Direct Chemical Looping (CDCL) technology - a one-step process to produce both electric power and high-purity carbon dioxide (CO2). The test, led by OSU Professor Liang-Shih Fan, represents the longest integrated operation of chemical looping technology anywhere in the world to date. The test was conducted at OSU's 25 kilowatt thermal (kWt) CDCL combustion sub-pilot unit under the auspices of DOE's Carbon Capture Program, which is developing innovative environmental control technologies to foster the

118

Solanaceae Coordinated Agricultural Project Dedicated to the Improvement of Potato and Tomato  

E-Print Network (OSTI)

SolCAP Solanaceae Coordinated Agricultural Project Dedicated to the Improvement of Potato are dedicated to the improvement of the Solanaceae crops: potato and tomato. Through innovative researchCAP Project Participants #12;SolCAP Project OverviewResearch - Education - Extension [Potato Example] mRNA > c

Douches, David S.

119

NETL: News Release - DOE Oil Recovery Project Extends Success through  

NLE Websites -- All DOE Office Websites (Extended Search)

5 , 2007 5 , 2007 DOE Oil Recovery Project Extends Success through Technology Transfer New Technologies & Techniques Boost U.S. Proved Oil Reserves, Travel the Globe WASHINGTON, DC - A groundbreaking oil-recovery project funded by the U.S. Department of Energy (DOE) is coming to a close, but its success will continue to be felt throughout the United States and the world. MORE INFO Read 03.10.06 Techline: DOE-Funded Project Revives Aging California Oilfield The project, titled "Increasing Heavy Oil Reserves in the Wilmington Oil Field Through Advanced Reservoir Characterizations and Thermal Production Technologies," began in 1995 with the goal of increasing recoverable heavy oil reserves in those sections of the Wilmington oilfield operated by Long

120

USDA and DOE Fund Genomics Projects For Bioenergy Fuels Research |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fund Genomics Projects For Bioenergy Fuels Research Fund Genomics Projects For Bioenergy Fuels Research USDA and DOE Fund Genomics Projects For Bioenergy Fuels Research August 9, 2006 - 8:43am Addthis WASHINGTON, DC - Aug. 9, 2006 - Energy Secretary Samuel Bodman and Agriculture Secretary Mike Johanns today announced that the Department of Agriculture and the Department of Energy (DOE) have jointly awarded nine grants totaling $5.7 million for biobased fuels research that will accelerate the development of alternative fuel resources. Bodman commented, "These research projects build upon DOE's strategic investments in genomics, to accelerate scientific discovery and promote the development of alternative energy sources vital to America's energy and economic security." "To be a reliable renewable energy source, farmers and ranchers will need

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Paso del Norte Watershed Council Coordinated Water Resources Database Project  

E-Print Network (OSTI)

?Actualizaci?n del plan maestro para el mejoramiento de los servicios de agua potable, drenaje y saneamiento en Cd. Ju?rez, Chih.? Actual data elements/variables Source(s) of data Research from ?Servicio de Ingenier?a e Inform?tica S.C.? coordinated...

Brown, Christopher; Sheng, Zhuping; Rich, Matt

122

Project Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Management Management Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Management Print Text Size: A A A RSS Feeds FeedbackShare Page Contains resources and information that may be useful for Federal Project Directors, HQ Program Managers, senior SC management, or contractor project management personnel. Specific information includes:

123

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Detection and Production of Methane Hydrate Last Reviewed 5/15/2012 Detection and Production of Methane Hydrate Last Reviewed 5/15/2012 DE-FC26-06NT42960 Goal The goal of this project is to improve the understanding of regional and local differences in gas hydrate systems from three perspectives: as an energy resource, as a geohazard, and as a long-term influence on global climate. Performers Rice University, Houston, TX University of Texas, Austin, TX Oklahoma State University, Stillwater, OK Background Heterogeneity in the distribution of gas hydrate accumulations impacts all aspects of research into gas hydrate natural systems. The challenge is to delineate, understand, and appreciate these differences at the regional and local scales, where differences in in situ concentrations are relevant to the importance of gas hydrate as a resource, a geohazard, and a factor in

124

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

High-Resolution Sidescan Sonar and Multibeam Bathymetric Data Collection and Processing, Atwater Canyon, Gulf of Mexico High-Resolution Sidescan Sonar and Multibeam Bathymetric Data Collection and Processing, Atwater Canyon, Gulf of Mexico DE-AT26-97FT34344 photo of DTAGS seismic source being deployed DTAG seismic source being deployed courtesy Naval Research Laboratory Goal: During February 14-18, 2005, a scientific cruise was conducted using the R/V Pelican to obtain high-resolution sidescan sonar and multibeam bathymetric data of Mounds D and F in the Atwater Valley area of the Gulf of Mexico, to better characterize sites selected for experimental drilling by the ChevronTexaco Gas Hydrates Joint Industry Project (JIP). Performers: Naval Research Lab - Dr. Joan Gardner Location: Washington, DC 20375 Atwater Valley, Gulf of Mexico Background: During May, 2004 the Naval Research Lab (NRL) collected piston cores and

125

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Studies in Support of Characterization of Recoverable Resources from Methane Hydrate Deposits Last Reviewed 5/10/2012 Laboratory Studies in Support of Characterization of Recoverable Resources from Methane Hydrate Deposits Last Reviewed 5/10/2012 ESD05-048 Goal The project is bringing new laboratory measurements and evaluation techniques to bear on the difficult problems of characterization and gas recovery from methane hydrate deposits. Performer Lawrence Berkeley National Laboratory, Berkeley, CA 94720 Background LBNL is performing laboratory tests to provide data to support the characterization and development of methane hydrate deposits. Major areas of research underway include hydrologic measurements, combined geomechanical/geophysical measurements, and synthetic hydrate formation studies. Hydrologic Measurements Relatively little research has been done to experimentally determine

126

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Collection and Microbiological Analysis of Gas Hydrate Cores Collection and Microbiological Analysis of Gas Hydrate Cores FWP-4340-60 and FWP-42C1-01 Goal Determine the presence and activity of methanogens in methane hydrate-bearing sediments. Background The project was set up to determine a fundamental modeling parameter - the amount of methane generated in deep sediments by methanogenic microorganisms. This would allow methane distribution models of gas hydrate reservoirs to accurately reflect an unknown volume and the distribution of biogenic methane within in a reservoir. The personnel at INEL have experience in similar biologic research and are considered to be experts by their global peers. Performer Idaho National Engineering and Environmental Laboratory (INEEL) - sample collection and analysis Location

127

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Heat flow and gas hydrates on the continental margin of India Last Reviewed 12/15/2011 Heat flow and gas hydrates on the continental margin of India Last Reviewed 12/15/2011 DE-NT0005669 Goal The goals of this project are to construct maps of apparent and residual heat flow through the western continental margin of India and to investigate the relationship of residual heat flow anomalies to fluid flow and gas hydrate distribution in the subsurface. Performer Oregon State University, College of Oceanic and Atmospheric Science, Corvallis, OR 97331 Map of the four regions sampled during NGHP Expedition 01 Map of the four regions sampled during NGHP Expedition 01 Background Gas hydrate distribution in sediments depends on methane supply, which in turn depends on fluid flow. When drilling data are available to calibrate seismic observations of the base of the gas hydrate stability zone (GHSZ),

128

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Gathering, Processing and Evaluating Seismic and Physical Data on Gas Hydrates in the Gulf of Mexico Last Reviewed 02/05/2010 Gathering, Processing and Evaluating Seismic and Physical Data on Gas Hydrates in the Gulf of Mexico Last Reviewed 02/05/2010 DE-AT26-97FT34343 photo of piston core apparatus prior to being dropped Piston core apparatus with 6-ton weight prior to being dropped Photo courtesy USGS Goal The goal of the project is to characterize hydrates in the Gulf of Mexico (GOM) and further develop field techniques for characterizing hydrates. Performer US Geological Survey, Woods Hole Field Center Location Woods Hole Massachusetts Background Oceanic methane hydrates are a major emerging research topic spanning energy resource issues, global climate change, seafloor stability, ocean acoustics, impact on deep marine biota, and a number of special topics. Recent developments in the last five years have both broadened and deepened

129

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Seismic-Scale Rock Physics of Methane Hydrate Seismic-Scale Rock Physics of Methane Hydrate DE-FC26-05NT42663 Goal The goal of this project was to establish rock physics models for use in generating synthetic seismic signatures of methane hydrate reservoirs. Ultimately, the intent was to improve seismic detection and quantification of offshore and onshore methane hydrate accumulations. Performer Stanford University, Stanford, CA 94305 Background Gas hydrate reservoir characterization is, in principle, no different from traditional hydrocarbon reservoir characterization. The seismic response of the subsurface is determined by the spatial distribution of the elastic properties (properties of the subsurface that deform as seismic waves pass through it) and attenuation. By mapping changes in the elastic properties, scientists can identify geologic features, including hydrocarbon reservoirs.

130

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessing the Efficacy of the Aerobic Methanotropic Biofilter in Methane Hydrate Environments Last Reviewed 1/8/2013 Assessing the Efficacy of the Aerobic Methanotropic Biofilter in Methane Hydrate Environments Last Reviewed 1/8/2013 DE-NT0005667 Goal The goal of this project is to assess the efficacy of aerobic methanotrophy in preventing the escape of methane from marine, hydrate-bearing reservoirs to the atmosphere and ultimately to better define the role of aerobic methanotrophy in the global carbon cycle. Graph overlayed on photo - Methane seeps with the resulting methane plume Methane seeps with the resulting methane plume, Geophysical Research Letters, November 2007 Performers University of California – Santa Barbara, Santa Barbara (UCSB), CA 93106 Background The global methane reservoir in the form of gas hydrate is estimated at 500–10,000 Gt (KVENVOLDEN, 1995; MILKOV, 2004). This pool of carbon

131

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Mechanical Testing of Gas Hydrate/Sediment Samples Mechanical Testing of Gas Hydrate/Sediment Samples DE-AT26-99FT40267 Goal Develop understanding of the mechanical characteristics of hydrate-containing sediments. Background The ACE CRREL has a unique group of experienced personnel that have studied the mechanical characteristics of ice and permafrost that can be applied to the study and characterization of the mechanical properties of gas hydrates. The effort aims to quantify the mechanical characteristics of methane hydrate and hydrate cemented sediments for use in models of the dynamic behavior of sediments related to drilling and seafloor installations in the Gulf of Mexico. Performers US Army Corp of Engineers, Engineer Research and Development Center, Cold Regions Research and Engineering Laboratory (CRREL) - project management and research products

132

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Gas Hydrate Production Trial Using CO2 / CH4 Exchange Completed Gas Hydrate Production Trial Using CO2 / CH4 Exchange Completed DE-NT0006553 Goal The goal of this project is to define, plan, conduct and evaluate the results of a field trial of a methane hydrate production methodology whereby carbon dioxide (CO2) molecules are exchanged in situ for methane (CH4) molecules within a hydrate structure, releasing the methane for production. The objective is to evaluate the viability of this hydrate production technique and to understand the implications of the process at a field scale. image showing Conceptual rendering of proposed CO2 - CH4 exchange methodology for the production of natural gas from hydrates Conceptual rendering of proposed CO2 - CH4 exchange methodology for the

133

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Recovery from Hydrate-bearing Sediments Last Reviewed 11/30/2011 Methane Recovery from Hydrate-bearing Sediments Last Reviewed 11/30/2011 DE-FC26-06NT42963 Goal The goal of this project is to develop observational and experimental data that can provide a better understanding of the basic mechanisms at work in a methane hydrate reservoir that is under production. To this end, a thorough physical understanding of underlying phenomena associated with methane hydrate production will be acquired through unique, multi-scale experiments and associated analyses. In addition, one or more mathematical models that account for the observed phenomena and provide insights that may help to optimize methane hydrate production methods will be developed. Performers Georgia Tech Research Corporation, Atlanta, Georgia 30332 Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee 37831

134

Applicant DOE Award Project Location Project Focus Feasibility Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

buildings and assist the Tribe's efforts to buildings and assist the Tribe's efforts to reduce the amount of energy used in their buildings. The Sea Lion Corporation $200,000 Hooper Bay, AK The project will train staff members to become energy assessors and weatherization technicians who specialize in energy efficient building construction and energy saving technologies. A feasibility study will also be conducted to determine how to achieve a 30 percent reduction in residential and commercial energy use and show the economic benefits of energy efficiency. Coeur d'Alene Tribe $163,952 Plummer, ID This project will assess and determine the technical and economic feasibility of energy efficiency improvements to existing Tribally-owned buildings. The goal is to

135

Eight Advanced Coal Projects Chosen for Further Development by DOE's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eight Advanced Coal Projects Chosen for Further Development by Eight Advanced Coal Projects Chosen for Further Development by DOE's University Coal Research Program Eight Advanced Coal Projects Chosen for Further Development by DOE's University Coal Research Program July 5, 2011 - 1:00pm Addthis Washington, DC - The Department of Energy has selected eight new projects to further advanced coal research under the University Coal Research Program. The selected projects will improve coal conversion and use and will help propel technologies for future advanced coal power systems. The selections will conduct investigations in three topic areas -- computational energy sciences, material science, and sensors and controls -- and will be funded at a maximum of $300,000 for 36 months. The Office of Fossil Energy's National Energy Technology Laboratory (NETL) will manage

136

NETL: News Release - DOE Projects to Advance Environmental Science and  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Projects to Advance Environmental Science and Technology DOE Projects to Advance Environmental Science and Technology Nine Unconventional Natural Gas Projects Address Water Resource and Management Issues Washington, D.C. - The Office of Fossil Energy's National Energy Technology Laboratory (NETL) has selected nine new projects targeting environmental tools and technology for shale gas and coalbed methane (CBM) production. NETL's goals for these projects are to improve management of water resources, water usage, and water disposal, and to support science that will aid the regulatory and permitting processes required for shale gas development. A primary goal of Fossil Energy's Oil and Natural Gas Program is to enhance the responsible development of domestic natural gas and oil resources that supply the country's energy. A specific objective is to accelerate the development and demonstration of technologies that will aid our country's independent producers in dealing with use and treatment of water related to natural gas and oil production.

137

DOE Announces $60 Million in Projects to Accelerate Scientific Discovery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Million in Projects to Accelerate Scientific 0 Million in Projects to Accelerate Scientific Discovery through Advanced Computing DOE Announces $60 Million in Projects to Accelerate Scientific Discovery through Advanced Computing September 7, 2006 - 8:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science today announced approximately $60 million in new awards annually for 30 computational science projects over the next three to five years. The projects are aimed at accelerating research in designing new materials, developing future energy sources, studying global climate change, improving environmental cleanup methods and understanding physics from the tiniest particles to the massive explosions of supernovae. "Advanced computing is a critical element of President Bush's American

138

NETL: Methane Hydrates - DOE/NETL Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Support of Gulf of Mexico Hydrate Research Consortium: Activities to Support Establishment of Sea Floor Monitoring Station Support of Gulf of Mexico Hydrate Research Consortium: Activities to Support Establishment of Sea Floor Monitoring Station DE-FC26-02NT41328 Goal Determine the potential impacts of gas hydrate instability in terms of the release of methane into seafloor sediments, the ocean and the atmosphere. Performers University of California, San Diego (Scripps Institution of Oceanography) - manage geochemical, hydrological and sedimentological investigations Texas A&M University - manage field monitoring program Location La Jolla, California 92093 Background This project will monitor, characterize, and quantify the rates of formation and dissociation of methane gas hydrates at and near the seafloor in the northern Gulf of Mexico, and determine linkages between formation/dissociation and physical/chemical parameters of the deposits over the course of a year. The stability and response of shallow gas hydrates to temperature and chemical perturbations will be monitored in situ, and localized seafloor and water column environmental impacts of hydrate formation and dissociation characterized. The following will be determined: 1) The equilibrium/steady state conditions for structure II methane gas hydrates at the field site,2) whether the system is in dynamic equilibrium and the local hydrology is characterized by steady state episodic fluid flow, and 3) how fluid fluxes and fluid composition work together to dynamically influence gas hydrate stability.

139

U.S. DOE Technical Assistance Project | Open Energy Information  

Open Energy Info (EERE)

Technical Assistance Project Technical Assistance Project (Redirected from Technical Assistance Project) Jump to: navigation, search Logo: Technical Assistance Project Name Technical Assistance Project Agency/Company /Organization U.S. Department of Energy Sector Energy Focus Area Energy Efficiency Website http://apps1.eere.energy.gov/w References Program Homepage[1] Abstract The Technical Assistance Project, or TAP, is a program which provides "state and local officials with quick, short-term access to experts at U.S. Department of Energy (DOE) National Laboratories for assistance with their renewable energy and energy efficiency policies and programs. The Technical Assistance Project, or TAP, is a program which provides "state and local officials with quick, short-term access to experts at U.S.

140

DOE Humanities Projects Announced | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Humanities Projects Announced DOE Humanities Projects Announced Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) News & Resources ASCR Discovery Monthly News Roundup News Archives ASCR Program Documents ASCR Workshops and Conferences ASCR Presentations 100Gbps Science Network Related Links Contact Information Advanced Scientific Computing Research U.S. Department of Energy SC-21/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-7486 F: (301) 903-4846 E: sc.ascr@science.doe.gov More Information » Miscellaneous DOE Humanities Projects Announced Print Text Size: A A A RSS Feeds FeedbackShare Page Last year, the Department of Energy announced a partnership with the

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Cosmological toolkit project featured on DOE energy website | Argonne  

NLE Websites -- All DOE Office Websites (Extended Search)

Cosmological toolkit project featured on DOE energy website Cosmological toolkit project featured on DOE energy website October 2, 2013 Tweet EmailPrint Researchers from Argonne National Laboratory, in partnership with Fermilab and Lawrence Berkeley National Laboratory, are developing a state-of-the-art toolkit for analyzing cosmological simulation data. The work was recently featured on the DOE website Energy.gov. Leading the Argonne team are Salman Habib, senior physicist and computational scientist in Argonne's High Energy Physics and Mathematics and Computer Science Divisions, and Ravi Madduri, project manager in the MCS Division. The multilaboratory team seeks to create an open platform with a web-based front end that will allow scientists to transfer, search, and analyze the complex data being generated by galaxy-formation simulations. Key to this

142

DOE Projects Announced to Better Understand Amazon Regional Climate  

NLE Websites -- All DOE Office Websites (Extended Search)

3 » DOE Projects 3 » DOE Projects Announced to Better Understand Amazon Regional Climate News Featured Articles 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Headlines Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 11.19.13 DOE Projects Announced to Better Understand Amazon Regional Climate Green Ocean Amazon 2014, sponsored in part by the U.S. Department of Energy, is an interagency, international campaign with the overarching goal of advancing the understanding of how land-atmosphere processes affect tropical hydrology and climate within the Amazon Basin. Print Text Size: A A A Subscribe FeedbackShare Page Washington, D.C. - The U.S. Department of Energy is awarding $1.9 million

143

DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Demonstrates Benefits of Constructed Wetlands Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources March 10, 2009 - 1:00pm Addthis Washington, DC -- In a pilot-scale test supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, Clemson University researchers have shown that manmade or "constructed" wetlands can be used to treat non-traditional water sources which could then be used in power plants or for other purposes. The successful test, which was managed by DOE's National Energy Technology Laboratory (NETL), could help power plants economically meet criteria for water reuse or discharge established by the National Pollution Discharge Elimination System and the Clean Water Act.

144

Low Dose Radiation Research Program: DOE / NASA Joint Funded Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/NASA Joint Funded Projects DOE/NASA Joint Funded Projects NASA Source Photo Space explorers are subject to exposure to low dose ionizing radiation. Research that helps determine health risks from this exposure is funded by NASA and DOE. Source: NASA DOE's Low Dose Program and the National Aeronautics and Space Administration (NASA) jointly fund new research to develop a better scientific basis for understanding risks to humans from exposures to low doses or low fluences of ionizing radiation. Research must focus on elucidating molecular mechanisms and pathways involved in normal radiobiological responses to low dose exposure, and must have the potential to ultimately increase understanding of health outcomes from radiation exposures that are at or near current workplace exposure

145

DOE Selects Ten Projects to Conduct Advanced Turbine Technology Research |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Projects to Conduct Advanced Turbine Technology Ten Projects to Conduct Advanced Turbine Technology Research DOE Selects Ten Projects to Conduct Advanced Turbine Technology Research August 14, 2013 - 1:44pm Addthis WASHINGTON, D.C. - Ten university projects to conduct advanced turbine technology research under the Office of Fossil Energy's University Turbine Systems Research (UTSR) Program have been selected by the U.S. Department of Energy (DOE) for additional development. Developing gas turbines that run with greater cleanness and efficiency than current models is of great benefit both to the environment and the power industry, but development of such advanced turbine systems requires significant advances in high-temperature materials science, an understanding of combustion phenomena, and development of innovative

146

"DOE IDIQ ESPC Awarded Projects Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE IDIQ ESPC Awarded Projects Summary DOE IDIQ ESPC Awarded Projects Summary " ,"Project Count","Project Investment","Contract Price","Guaranteed Cost Savings","Annual Energy Savings (btu x 10^6)","Cumulative Energy Savings (btu x 10^6)" "Total for FY 1998",5,6575201,14990629,17162375,60931,783240 "Total for FY 1999",15,40950583,93441996,94265528,340539,5660293 "Total for FY 2000",20,62161736,130641996,131703866,609730,9510029 "Total for FY 2001",31,126376566,259078354,273213735,869148,13374390 "Total for FY 2002",19,112866816,337364927,340061131,1032973,21194077 "Total for FY 2003",39,260867190,531558407,541848764,2543263,35515859 "Total for FY 2004",6,28366270,63938167,66492625,310836,5496755

147

DOE Completes Large-Scale Carbon Sequestration Project Awards | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Large-Scale Carbon Sequestration Project Awards Completes Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards November 17, 2008 - 4:58pm Addthis Regional Partner to Demonstrate Safe and Permanent Storage of 2 Million Tons of CO2 at Wyoming Site WASHINGTON, DC - Completing a series of awards through its Regional Carbon Sequestration Partnership Program, the U.S. Department of Energy (DOE) today awarded $66.9 million to the Big Sky Regional Carbon Sequestration Partnership for the Department's seventh large-scale carbon sequestration project. Led by Montana State University-Bozeman, the Partnership will conduct a large-volume test in the Nugget Sandstone formation to demonstrate the ability of a geologic formation to safely, permanently and economically

148

NETL: News Release - DOE-Funded Project Honored with Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

16 , 2006 16 , 2006 DOE-Funded Project Honored with Environmental Stewardship Award Project Developed Low-Cost Methods, Tools to Remediate Old, Orphaned Oil Sites WASHINGTON, DC - A U.S. Department of Energy-funded project has been honored with a major national award for superior environmental stewardship related to oil and natural gas operations. The Interstate Oil and Gas Compact Commission (IOGCC), the leading authority on State oil and gas regulatory programs, gave its Environmental Partnership Award to the Kansas Corporation Commission (KCC), ALL Consulting LLC, of Tulsa, Okla., and DOE's National Energy Technology Laboratory. The annual award recognizes innovative projects that highlight environmental care in oil and gas operations and are led by non-industry organizations with the cooperation and participation of the petroleum industry. The Environmental Partnership Award is one of the IOGCC's four Chairman's Stewardship Awards, which recognize organizations that have demonstrated a voluntary commitment to excellence in the areas of environmental stewardship and energy education.

149

NETL: News Release - DOE Selects Projects to Conserve Freshwater at  

NLE Websites -- All DOE Office Websites (Extended Search)

17, 2008 17, 2008 DOE Selects Projects to Conserve Freshwater at Coal-Fired Power Plants Projects to Advance Technologies to Minimize Water Withdrawal, Consumption WASHINGTON, D.C. - The U.S. Department of Energy (DOE) announced the selection of 10 projects aimed at developing advanced technologies and concepts to minimize freshwater withdrawal and consumption by coal-based power systems. By improving the environmental performance of coal, America's most abundant energy resource, the projects will strengthen national energy security and help provide clean, affordable, abundant energy for future generations. Thermoelectric power plants are the second largest user of freshwater in the United States, requiring significant volumes to cool and condense the low-pressure steam from the plant's electricity-generating turbines. Only the agricultural sector, which uses large quantities of water for irrigation, withdraws more freshwater than thermoelectric power plants.

150

DOE-Sponsored Project Begins Demonstrating CCUS Technology in Alabama |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Begins Demonstrating CCUS Technology in Project Begins Demonstrating CCUS Technology in Alabama DOE-Sponsored Project Begins Demonstrating CCUS Technology in Alabama August 22, 2012 - 1:00pm Addthis Washington, DC - Carbon dioxide (CO2) injection has begun at the world's first fully integrated coal power and geologic storage project in southwest Alabama, with the goals of assessing integration of the technologies involved and laying the foundation for future use of CO2 for enhanced oil recovery (EOR). The "Anthropogenic Test"--conducted by the Southeast Regional Carbon Sequestration Partnership (SECARB), one of seven partnerships in DOE's Regional Carbon Sequestration Partnerships program--uses CO2 from a newly constructed post-combustion CO2-capture facility at Alabama Power's 2,657-megawatt Barry Electric Generating Plant (Plant Barry). It will help

151

DOE Hydrogen Codes and Standards Coordinating Committee Fuel Purity Specifications Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Codes and Standards Coordinating Committee Codes and Standards Coordinating Committee Fuel Purity Specifications Workshop April 26, 2004 Summary Notes Jim Ohi May 25, 2004 Neil Rossmeissl, DOE Technology Manager for Hydrogen Safety, Codes and Standards, welcomed the attendees and opened the workshop by providing background information on how an R&D plan for fuel purity would fit into the overall codes and standards R&D planning process. After introductions by the participants, Jim Ohi of NREL reviewed the agenda and the purpose of the workshop, which were to: 1. gain a better understanding of who is doing what in developing fuel purity guidelines and standards in terms of objectives, definitions, scope, timetable, and participants 2. develop a rough work breakdown structure of the fuel purity issue for the total "fuel

152

DOE Announces 12 Projects To Increase Vehicle Efficiency | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces 12 Projects To Increase Vehicle Efficiency Announces 12 Projects To Increase Vehicle Efficiency DOE Announces 12 Projects To Increase Vehicle Efficiency February 16, 2005 - 10:16am Addthis Industry Partners to Cost-Share Funding on $175 Million in Research Projects WASHINGTON, DC -- Secretary of Energy Samuel Bodman today announced the selection of projects that will increase the energy efficiency of passenger and commercial vehicles while maintaining low emissions. Twelve projects, with a total value of $175 million (50 percent, or $87.5 million contributed by the private sector) will focus on development of advanced combustion engine and waste heat recovery technologies. "Together with our private sector partners, the Department of Energy is pursuing innovative new technologies to improve vehicle fuel efficiency and

153

Project Development | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities » Project Facilities » Project Development Nuclear Physics (NP) NP Home About Research Facilities Research Facilities Project Development Science Highlights Benefits of NP Funding Opportunities Nuclear Science Advisory Committee (NSAC) News & Resources Contact Information Nuclear Physics U.S. Department of Energy SC-26/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3613 F: (301) 903-3833 E: sc.np@science.doe.gov More Information » Facilities Project Development Print Text Size: A A A RSS Feeds FeedbackShare Page Project Development in the Office of Nuclear Physics Kern Proposals for Nuclear Physics projects and initiatives vary widely in their scope and complexity. The review and approval process, as well as the means by which support is provided, can differ and is dependent on several

154

DOE cost-shared in situ combustion projects revisited  

SciTech Connect

As part of its enhanced oil recovery (EOR) program, the US Department of Energy (DOE) and its predecessor organizations sponsored several cost-shared in situ combustion projects in the 1960s and 1970s. The goal of these projects was to evaluate the technical and economic feasibility of in situ combustion as a thermal oil recovery technique and provide information in the public domain as a means of reducing the risks associated with these high cost ventures. This study reviewed specific features of the cost-shared demonstration and experimental projects, and examined the causes that led to their success or failure. The failed projects were compared with the successful projects under similar settings to further document why these projects failed. The lessons learned were detailed.

Sarathi, P.S.; Olsen, D.K. [NIPER/BDM-Oklahoma, Bartlesville, OK (United States)

1995-02-01T23:59:59.000Z

155

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life  

E-Print Network (OSTI)

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life Cycle Reimbursable Funding://www.ornl.gov/wfo/exthome.htm September 27, 2007 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Briefing Outline · Summary #12;3 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Secretary of Energy Legal Authority

156

DOE Awards Task Order for Lexington Project Office Audit  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

157

DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone  

Energy.gov (U.S. Department of Energy (DOE))

In a project sponsored by the U.S. Department of Energy (DOE), a demonstration-scale application of RTI Internationals warm synthesis gas (syngas) cleanup process technology has achieved a key operational milestone at Tampa Electric Companys coal gasification plant in Polk County, Fla.

158

NETL: News Release - DOE-Supported Project Demonstrates Benefits of  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources Flue gas desulfurization water was treated in a constructed wetlands system consisting of five reactors planted with vegetation found in natural wetlands. The water to be treated was received from an operating coal-fired power plant in the south-eastern United States. Flue gas desulfurization water was treated in a constructed wetlands system consisting of five "reactors" planted with vegetation found in natural wetlands. The water to be treated was received from an operating coal-fired power plant in the south-eastern United States. Washington, DC - In a pilot-scale test supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, Clemson University researchers

159

PinonPine IGCC Power Project: A DOE Assesment  

NLE Websites -- All DOE Office Websites (Extended Search)

Piñon Pine IGCC Power Project Piñon Pine IGCC Power Project A DOE Assessment DOE/NETL-2003/1183 December 2002 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 West Third Street, Suite 1400 Tulsa, OK 74103-3519 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

160

DOE - Fossil Energy: R&D Project Data Base  

NLE Websites -- All DOE Office Websites (Extended Search)

About DOE Button Organization Button News Button Contact Us Button About DOE Button Organization Button News Button Contact Us Button Search Go Button US Department of Energy Seal and Header Photo Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button _ DOE Office of Fossil Energy Web Site Fossil Energy - Clean Coal Technologies - Carbon Capture, Utilization and Storage - Hydrogen & Other Clean Fuels - Oil & Natural Gas Technologies - Natural Gas Regulation - U.S. Petroleum Reserves - STAY CONNECTED Join Us on Facebook Follow Us on Twitter Sign Up for NewsAlerts Subscribe to our RSS Feeds You are here: Fossil Energy R&D Project Data Base The Department of Energy's Office of Fossil Energy typically manages more than 300 active research and development projects spanning a wide range of coal, petroleum and natural gas topics. You can access information on each of these projects from the Fossil Energy Online Project Database. There are three ways to obtain specific data on these projects:

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Oak Ridge National Laboratory Site Office (OSO) OSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page ORNL is able to support aspects of the DOE mission by identifying and then pursuing major activities that build on ORNL's core strengths and capabilities. The following projects are underway. 4000 Area Switchgear Vault, Institutional General Plant Project... Home to some of the highest technology research and computing infrastructure in the world, ORNL requires a level of electrical power quality and reliability that is significantly higher than typical

162

DOE Collaboration with National Geographic's JASON Project Yields Three  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Collaboration with National Geographic's JASON Project Yields Collaboration with National Geographic's JASON Project Yields Three CODiE Awards DOE Collaboration with National Geographic's JASON Project Yields Three CODiE Awards July 28, 2010 - 1:00pm Addthis Washington, DC - The JASON Project's multimedia energy curriculum has earned three CODiE Awards from the Software & Information Industry Association (SIIA). Developed with assistance from the Office of Fossil Energy's National Energy Technology Laboratory (NETL), Operation: Infinite Potential explores past, current, and future challenges of energy generation, storage, and consumption. NETL was one of four host sites used in developing the JASON Project's energy curriculum Operation: Infinite Potential. Visiting students learned about energy challenges and conducted research alongside NETL scientists.

163

DOE Awards Contract for Decontamination & Decommissioning Project for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decontamination & Decommissioning Project Decontamination & Decommissioning Project for the East Tennessee Technology Park DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park April 29, 2011 - 12:00pm Addthis Media Contact Mike Koentop (865) 576-0885 www.oakridge.doe.gov Oak Ridge, Tenn. - As part of its ongoing commitment to cleaning up the legacy of the Cold War at sites across the weapons complex, the U.S. Department of Energy has awarded a contract for the remaining environmental cleanup at the East Tennessee Technology Park (ETTP) to URS | CH2M Oak Ridge, LLC. The $2.2 billion contract will complete cleanup and provide support functions at ETTP, while supporting local jobs and area small businesses. "Today's contract announcement means that we can continue to meet our

164

DOE-STD-1149-2002; Safety and Health Program for DOE Construction Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

49-2002 49-2002 February 2002 DOE STANDARD SAFETY AND HEALTH PROGRAM FOR DOE CONSTRUCTION PROJECTS U.S. Department of Energy AREA OCSH Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-1149-2002 iii TABLE OF CONTENTS PARAGRAPH PAGE FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . .

165

NETL: News Release - DOE Selects Projects Targeting Deep Natural Gas  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2006 22, 2006 DOE Selects Projects Targeting Deep Natural Gas Resources Research Focuses on High-Tech Solutions to High Temperature, Pressure Challenges WASHINGTON, DC - The Department of Energy today announced the selection of seven cost-shared research and development projects targeting America's vast, but technologically daunting, deep natural gas resources. These projects focus on developing the advanced technologies needed to tackle drilling and production challenges posed by natural gas deposits lying more than 20,000 feet below the earth's surface. There, drillers and producers encounter extraordinarily high temperatures (greater than 400 °F) and pressures (greater than 15,000 psi), as well as extremely hard rock and corrosive environments. The projects come under the oversight of the Office of Fossil Energy's National Energy Technology Laboratory, which has managed the Deep Trek research program since its inception in 2002. To date, DOE has awarded 12 Deep Trek projects totaling over $31 million, (with $10 million contributed by research partners) and is currently managing another seven projects focused on resource assessment and improved imaging technology for deep reservoirs.

166

NETL: News Release - DOE Selects Eight Projects to Improve Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

February 23, 2004 February 23, 2004 DOE Selects Eight Projects to Improve Energy Efficiency in Mining The U.S. Department of Energy (DOE) has announced the selection of eight new technology-development projects designed to reduce energy consumption, enhance economic competitiveness, and reduce the environmental impacts of the domestic mining industry. The projects will be managed by DOE's National Energy Technology Laboratory (NETL), and are part of the Office of Energy Efficiency and Renewable Energy's Industries of the Future program. The Industries of the Future program is at the core of DOE's efforts to improve the energy efficiency of America's most energy-intensive industries. The program provides cost-shared support for research to address the needs of nine industries: agriculture, aluminum, chemicals, forest products, glass, metal casting, mining, petroleum, and steel. Its goal is to accelerate the development and use of advanced, energy efficient, renewable and pollution-prevention technologies that benefit industry, the environment, and U.S. energy security.

167

Project Status | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects, Projects, Missions, and Status High Energy Physics (HEP) HEP Home About Research Facilities Facility Ops Experiments at the Energy Frontier Experiments at the Intensity Frontier Experiments at the Cosmic Frontier Projects, Missions, and Status HEP User Facilities Science Highlights Benefits of HEP Funding Opportunities Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Facilities Projects, Missions, and Status Print Text Size: A A A RSS Feeds FeedbackShare Page The Office of High Energy Physics supports the construction of new facilities and major experimental equipment to advance the field of high

168

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Berkeley Site Office (BSO) BSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: bsowebinfo@bso.science.doe.gov Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Visit LBNL's Site Construction Information page External link for additional updates. Computational Research & Theory Facility:Currently, the main construction activities are steel and deck placement. The steel placement is due to be complete in December of 2013 and the exterior skin will follow. Project completion is scheduled for early 2015. Solar Energy Research Center: Superstructure is complete and utility

169

Applicant Location Requested DOE Funds Project Summary Feasibility Studies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requested Requested DOE Funds Project Summary Feasibility Studies Confederated Salish and Kootenai Tribes Pablo, MT $850,000 This project will evaluate the technical and economic viability of a co-generation biomass fuel power plant. The plant would use fuels from tribal forest management activities to provide between 2.5 to 20 megawatts (MW) of electricity to heat tribal buildings or sell on the wholesale market. Standing Rock Sioux Tribe Fort Yates, ND $430,982 This project will perform a feasibility study over the course of two years on three tribal sites to support the future development of 50 to 100 MW of wind power. Navajo Hopi Land Commission (NHLCO), Navajo Nation Window Rock, AZ $347,090 This project will conduct a feasibility study to explore potential

170

NETL: News Release - DOE Projects Provide Stepping Stone to America's  

NLE Websites -- All DOE Office Websites (Extended Search)

13, 2006 13, 2006 DOE Projects Provide Stepping Stone to America's Hydrogen Economy New Twist on Old Technology Stresses Feedstock Flexibility, Plant Mobility, Lower Emissions WASHINGTON, DC - Department of Energy (DOE)-funded research is tweaking an old technology to develop new supplies of ultra-clean liquid transportation fuels from both coal and natural gas-and in the process provide a new source of non-polluting hydrogen energy. Two projects managed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL) use a proprietary technology developed by Syntroleum Corp. of Tulsa, OK, to convert the Nation's abundant raw fossil fuels into either hydrogen or high hydrogen-content liquids, such as ultra-clean diesel and other environmentally-friendly liquid fuels.

171

NETL: News Release - DOE Project Turns Abandoned Oil Lease Into  

NLE Websites -- All DOE Office Websites (Extended Search)

March 27, 2001 March 27, 2001 DOE Project Turns Abandoned Oil Lease Into Million-Barrel Producer Advanced Technology Brings California Oil Field Back to Life BAKERSFIELD, CA - An abandoned Bakersfield, California oil lease, brought back to life in 1995 by a joint government-industry experimental project, has produced more than a million barrels of oil once thought unrecoverable. The Pru Lease Field is Now Back in Operation - Improved technology made possible by a joint DOE and private industry field test helped bring the Pru Lease back into production. - Because of the success, oil is now flowing from 100 new privately funded wells in the immediate vicinity, and experts predict that the advanced technologies demonstrated in the federally co-funded field test could lead

172

DOE Issues Environmental Assessment on Road Project for Public Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

173

The ENCOAL Mild Coal Gasification Project, A DOE Assessment  

SciTech Connect

This report is a post-project assessment of the ENCOAL{reg_sign} Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL{reg_sign} Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL{reg_sign} mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL{reg_sign} was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL{reg_sign} was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of $90,664,000. ENCOAL{reg_sign} operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC{trademark}) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF{trademark}) and Coal-Derived Liquids (CDL{trademark}). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall objective, the following goals were established for the ENCOAL{reg_sign} Project: Provide sufficient quantity of products for full-scale test burns; Develop data for the design of future commercial plants; Demonstrate plant and process performance; Provide capital and O&M cost data; and Support future LFC{trademark} technology licensing efforts. Each of these goals has been met and exceeded. The plant has been in operation for nearly 5 years, during which the LFC{trademark} process has been demonstrated and refined. Fuels were made, successfully burned, and a commercial-scale plant is now under contract for design and construction.

National Energy Technology Laboratory

2002-03-15T23:59:59.000Z

174

The CHUVA Project how does convection vary across the Brazil?  

E-Print Network (OSTI)

1 The CHUVA Project ­ how does convection vary across the Brazil? Luiz A. T. Machado1 , Maria A. F de Previsão de Tempo e Estudos Climáticos (CPTEC), Brazil. 2. Universidade de São Paulo. Instituto de Astronomia, Geofísica e Ciências Atmosféricas, Brazil. 3. Departamento de Ciências e Tecnologia Espacial

Chaboureau, Jean-Pierre

175

DOE project awards for Giner, US Hybrid, Vision Industries  

Science Journals Connector (OSTI)

The US Department of Energy's Office of Energy Efficiency & Renewable Energy (EERE) recently announced the selection of 40 new Small Business Innovation Research (SBIR) awards worth more than $6 million. Among the selections is a first-of-its-kind award under a new EERE SBIR technology-to-market topic that moves existing inventions developed at DOE's national labs to the marketplace and accelerates the pace of commercialisation. Two fuel cell projects were also included in the SBIR awards.

2014-01-01T23:59:59.000Z

176

NETL: News Release - Ten Projects Selected by DOE to Advance  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2010 7, 2010 Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture from Coal Power Plants Washington, D.C. -Ten projects aimed at developing advanced technologies for capturing carbon dioxide (CO2) from coal combustion have been selected by the U.S. Department of Energy (DOE) under its Innovations for Existing Plants (IEP) Program. Valued at approximately $67 million ($15 million in non-federal cost sharing) over three years, the projects are focused on reducing the "energy and efficiency penalties" associated with applying currently available carbon capture and storage (CCS) technologies to existing and new power plants. CO2 power plant capture systems currently require large amounts of energy for their operation, resulting in decreased efficiency and reduced net power output when compared to plants without CCS technology. These "penalties" can add as much as 80 percent to the cost of electricity for a new pulverized coal plant and about 35 percent to the cost of electricity for a new advanced gasification plant. The overall goal of research conducted by DOE's Office of Fossil Energy (FE) and managed by FE's National Energy Technology Laboratory (NETL) is to improve efficiencies and reduce these costs to less than 30 percent and 10 percent, respectively.

177

Microsoft Word - WBRT_Comments_DOE_Transmission_Coordination_DRAFT _2_ _2_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blvd., #105 | Lakewood, CO. 80228 | 303-216-9278 f: 303-496-0334 Blvd., #105 | Lakewood, CO. 80228 | 303-216-9278 f: 303-496-0334 info@westernroundtable.com | www.westernroundtable.com The opinions expressed in this letter represent the views of a majority of Roundtable Members, but not necessarily all of our members. October 20, 2008 Mr. John Schnagl Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 Re: Coordination of Federal Authorizations for Electric Transmission Facilities - (DOE, 10 CR Part 900, RIN 1901-AB18- Federal Register Vol. 73, no. 183, Friday, September 19, 2008) Dear Mr. Schnagl: The Western Business Roundtable ("Roundtable") respectfully submits the following comments

178

DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014  

Energy.gov (U.S. Department of Energy (DOE))

ACQUISITION AND PROJECT MANAGEMENT GLOSSARY OF TERMS HANDBOOK This handbook provides definitions of acquisition and project management terms commonly used in DOE projects to ensure consistent use of terms in DOE project documents and discussions. DOE APM Glossary of Terms Handbook Final, September 2014

179

Regional Science Bowl Coordinators | U.S. DOE Office of Science...  

Office of Science (SC) Website

Regional Science Bowl Coordinators National Science Bowl (NSB) NSB Home About National Science Bowl Contacts Regional Science Bowl Coordinators National Science Bowl FAQ's Alumni...

180

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Brookhaven Site Office (BHSO) BHSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: TellDOE@bnl.gov Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Interdisciplinary Science Building (ISB) Interdisciplinary Science Building (ISB) The approximately 80,000 gsf 2-story state-of-the-art building will be a new energy efficient and environmentally sustainable laboratory building that will provide modern, 21st-century, high-accuracy laboratories, offices and support functions. The building will intellectually group existing energy research scientists into one facility with collaborative

182

NETL: Methane Hydrates - DOE/NETL Projects - NT42496  

NLE Websites -- All DOE Office Websites (Extended Search)

Conducting Scientific Studies of Natural Gas Hydrates to Support the DOE Efforts to Evaluate and Understand Methane Hydrates Last Reviewed 05/16/2011 Conducting Scientific Studies of Natural Gas Hydrates to Support the DOE Efforts to Evaluate and Understand Methane Hydrates Last Reviewed 05/16/2011 DE-AI26-05NT42496 Goal The United States Geological Survey (USGS) conducts scientific studies of natural gas hydrates in support of DOE efforts to evaluate and understand methane hydrates, their potential as an energy resource, and the hazard they may pose to ongoing drilling efforts. This project extends USGS support to the DOE Methane Hydrate Research Program previously supported under DE-AT26-97FT34342 and DE-AT26-97FT34343. Performer U.S. Geological Survey at Denver, CO, Woods Hole, MA, and Menlo Park, CA. Background The USGS Interagency Agreement (IA) involves laboratory research and international field studies in which DOE/NETL has a significant interest.

183

LIMB demonstration project extension and Coolside demonstration: A DOE assessment  

SciTech Connect

The goal of the US Department of Energy (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have already reached the proof-of-concept stage. This document serves as a DOE post-project assessment of the CCT Round 1 project ``LIMB Demonstration Project Extension and Coolside Demonstration'', described in a report to Congress (Babcock and Wilcox 1987), a paper by DePero et al. (1992), and in a report by Goots et al. (1992). The original limestone injection multistage burner (LIMB) demonstration work was conducted by Babcock and Wilcox Company (B and W) beginning in 1984, under the sponsorship of the US Environmental Protection Agency (EPA) and the State of Ohio Coal Development Office (OCDO). In 1987, B and W and the Ohio Edison Company agreed to extend the full-scale demonstration of LIMB technology under the sponsorship of DOE through its CCT Program, and with support from OCDO and Consolidation Coal Company, now known as CONSOL. In a separate effort, CONSOL had been developing another flue gas desulfurization (FGD) technology known as the Coolside process. Both LIMB and Coolside use sorbent injection to remove SO{sub 2}. The LIMB process injects the sorbent into the furnace and the Coolside injects the sorbent into the flue gas duct. In addition, LIMB uses low-NO{sub x} burners to reduce NO{sub x} emissions; hence it is categorized as a combination SO{sub 2}/NO{sub x} control technology. To take advantage of synergism between the two processes, the CCT project was structured to incorporate demonstration of both the LIMB and Coolside processes. Coolside testing was accomplished between July 1989 and February 1990, and the LIMB Extension test program was conducted between April 1990 and August 1991. The host site for both tests was the 105 MWe coal-fired Unit 4 at Ohio Edison's Edgewater Station in Lorain, Ohio. The major performance objectives of this project were successfully achieved, with SO{sub 2} emissions reductions of up to 70% demonstrated in both processes.

National Energy Technology Laboratory

2000-04-30T23:59:59.000Z

184

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Announces 27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces 27 Million to Reduce Costs of Solar Energy Projects,...

185

NASA and DOE Jefferson Lab Agree to Explore Mutual Research Projects...  

NLE Websites -- All DOE Office Websites (Extended Search)

NASA and DOE Jefferson Lab Agree to Explore Mutual Research Projects Two local research powerhouses have agreed to explore projects of mutual interest - like "growing" hair-like...

186

Construction Begins on DOE-Sponsored Carbon-Capture Project at...  

Energy Savers (EERE)

Construction Begins on DOE-Sponsored Carbon-Capture Project at Kentucky Power Plant Construction Begins on DOE-Sponsored Carbon-Capture Project at Kentucky Power Plant July 21,...

187

DOE and USDA Select Projects for more than $24 Million in Biomass...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE and USDA Select Projects for more than 24 Million in Biomass Research and Development Grants DOE and USDA Select Projects for more than 24 Million in Biomass Research and...

188

LIFAC Sorbent Injection Desulfurization Demonstration Project: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

41 41 LIFAC Sorbent Injection Desulfurization Demonstration Project: A DOE Assessment January 2001 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov Disclaimer 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

189

The ENCOAL Mild Coal Gasification Project, A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

71 71 The ENCOAL ® Mild Coal Gasification Project A DOE Assessment March 2002 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

190

Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Advanced Flue Gas Desulfurization (AFGD) Demonstration Project A DOE Assessment August 2001 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

191

Introduction to Measurement & Verification for DOE Super ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction to M&V Introduction to M&V Introduction to Measurement & Verification for DOE Super ESPC Projects June 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's web site at http://www1.eere.energy.gov/femp/financing/superespcs_mvresources.html. Introduction to M&V Contents WHY MEASURE AND VERIFY? .................................................................................... 1 OVERVIEW OF M&V ...................................................................................................... 1

192

SASSI Subtraction Method Effects at Various DOE projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subtraction Method Effects Subtraction Method Effects at Various DOE projects U.S. Department of Energy Natural Phenomena Hazards Workshop October 25-26, 2011 Greg E. Mertz, Michael C. Costantino, Thomas W. Houston, Andrew S. Maham CJCAssociates 2 Outline  PF-4  CMRR  UPF  Generic Study  Lessons Learned Note: Project results represent work-in-progress and do imply regulatory acceptance CJCAssociates 3 SASSI Solution Methods for Embedded Structures CJCAssociates 4 PF-4 Two story Box-type RC Structure 284'x265'x39' Embedded ~18' 1970's construction Thin basement floor with spread footings Flat slab interior floor supported by columns with capitals CJCAssociates 5 TA-55 Soil Profile Surface Control Motion LANL PC-3 Free-Field Input PF-4 SSI Analysis

193

FUNDAMENTAL FLUIDIZATION RESEARCH PROJECT DOE/E~0575 ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FUNDAMENTAL FLUIDIZATION RESEARCH PROJECT FUNDAMENTAL FLUIDIZATION RESEARCH PROJECT DOE/E~0575 ENVIRONMENTAL ASSESSMENT JANUARY 1994 Prepared by U.S. Department of Energy Morgantown Energy Technology Center P.O. Box 880 Morgantown, WV 26507-0880 q e!" .t= I \, F= ··-0 Nov 1 5 19911a n V \) r I Iv,ASTER tJ :DISTRIBUTION OF THIS DOCUMENT IS UNL~ITe:> Jf DISCLAIMER This report was .. prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

194

Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit  

SciTech Connect

The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

Braams, B. J.; Chung, H.-K. [Nuclear Data Section, NAPC Division, International Atomic Energy Agency, P. O. Box 100, Vienna International Centre, A-1400 Vienna (Austria)

2011-05-11T23:59:59.000Z

195

DOE/NETL-2002/1164 Wabash River Coal Gasification Repowering Project: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Wabash River Coal Gasification Repowering Project: A DOE Assessment January 2002 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

196

DOE Funds 15 New Projects to Develop Solar Power Storage and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 New Projects to Develop Solar Power Storage and Heat Transfer Projects For Up to 67.6 Million DOE Funds 15 New Projects to Develop Solar Power Storage and Heat Transfer...

197

LIMB Demonstraton Project Extension and Coolside Demonstration: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 LIMB Demonstration Project Extension and Coolside Demonstration: A DOE Assessment April 2000 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

198

Microsoft Word - DOE Produced Water Project - Final Report 2.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Technical Progress Report Annual Technical Progress Report October 1, 2005 to March 31, 2006 DOE Award No. 41906 Use of Produced Water in Recirculating Cooling Systems at Power Generating Facilities Deliverable Number 11 Kent Zammit, EPRI Project Manager Electric Power Research Institute, Inc. 3412 Hillview Ave. Palo Alto, CA 94304-13952 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe

199

NETL: Methane Hydrates - DOE/NETL Projects - Advanced Hydrate Reservoir  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Hydrate Reservoir Modeling Using Rock Physics Techniques Last Reviewed 11/29/2013 Advanced Hydrate Reservoir Modeling Using Rock Physics Techniques Last Reviewed 11/29/2013 DE-FE0010160 Goal The primary goal of this research is to develop analytical techniques capable of quantitatively evaluating the nature of methane hydrate reservoir systems through modeling of their acoustic response using techniques that integrate rock physics theory, amplitude analysis, and spectral decomposition. Performers Fugro GeoConsulting, Inc., Houston TX Background Past efforts under the DOE-supported Gulf of Mexico Joint Industry project included the selection of well locations utilizing prospectivity analysis based primarily on a petroleum systems approach for gas hydrate using 3-D exploration seismic data and derivative analyses that produced predicted

200

Certified Federal Project Directors | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Certified Federal Project Directors Certified Federal Project Directors Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors FPD Leadership Skills .pdf file (29KB) SC FPD 360° Mentoring Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors Print Text Size: A A A RSS Feeds FeedbackShare Page Site Federal Project Director Level Certified Project Contact Information Ames Site Office (AMSO) Cynthia Baebler 1 630-252-1563 cynthia.baebler@ch.doe.gov Argonne Site Office (ASO) Dale Dietzel 1 630-252-2555 dale.dietzel@ch.doe.gov

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE Alaska Native Village Renewable Energy Project Development Workshop  

Office of Energy Efficiency and Renewable Energy (EERE)

Presented by the U.S. Department of Energy's (DOE's) Office of Indian Energy with support from DOEs National Renewable Energy Laboratory, this interactive workshop will walk participants through...

202

DOE Issues Draft RFP for Idaho Cleanup Project Core | Department...  

Office of Environmental Management (EM)

on the Draft RFP is available at: https:www.emcbc.doe.govSEBICPCOREindex.php. DOE has requested that all comments, questions, suggested changes, and feedback should...

203

Application of the BISON Fuel Performance Code to the FUMEX-III Coordinated Research Project  

SciTech Connect

INL recently participated in FUMEX-III, an International Atomic Energy Agency sponsored fuel modeling Coordinated Research Project. A main purpose of FUMEX-III is to compare code predictions to reliable experimental data. During the same time period, the INL initiated development of a new multidimensional (2D and 3D) multiphysics nuclear fuel performance code called BISON. Interactions with international fuel modeling researchers via FUMEX-III played a significant and important role in the BISON evolution, particularly influencing the selection of material and behavioral models which are now included in the code. BISON's ability to model integral fuel rod behavior did not mature until 2011, thus the only FUMEX-III case considered was the Riso3-GE7 experiment, which includes measurements of rod outer diameter following pellet clad mechanical interaction (PCMI) resulting from a power ramp late in fuel life. BISON comparisons to the Riso3-GE7 final rod diameter measurements are quite reasonable. The INL is very interested in participation in the next Fuel Modeling Coordinated Research Project and would like to see the project initiated as soon as possible.

R. L. Williamson; S. R. Novascone

2012-04-01T23:59:59.000Z

204

DOE/NETL-2000/1112, Confined Zone Dispersion Project: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

12 12 Confined Zone Dispersion Project: A DOE Assessment November 1999 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, West Virginia 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, Pennsylvania 15236-0940 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein

205

DOE-TSPP-4, Registering a Technical Standard Project - July 1...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2009 DOE-TSPP-4, Registering a Technical Standard Project - July 1, 2009 Technical Standards Program Procedures (TSPP) - August 26, 2009 This procedure outlines the process...

206

DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda  

Energy.gov (U.S. Department of Energy (DOE))

DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda, held February 8-9, 2005 by Argonne National Laboratory

207

Funded Projects NEPA Does Not Apply Categorical Exclusions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 30, 2010 June 30, 2010 Page 1 # of ARRA Funded Projects NEPA Does Not Apply Categorical Exclusions (CE) CE Pending CE Done Environmental Assessments (EA) EA Pending EA Done Environmental Impact Statements (EIS) EIS Pending EIS Done All NEPA Actions All Withdrawn Actions All Pending NEPA Actions All Completed NEPA Actions OVERALL TOTALS: 215,159 4,240 175,498 821 174,677 9,808 749 9,059 829 36 793 186,135 1,403 1,606 184,529 Department of Agriculture (USDA): 132,570 254 93,586 37 93,549 1,303 3 1,300 150 0 150 95,039 110 40 94,999 Agricultural Research Service (ARS) 41 2 38 0 38 1 0 1 0 0 0 39 0 0 39 Farm Service Agency (FSA) 38,592 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Food and Nutrition Service (FNS) 251 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Foreign Agricultural Service (FAS) 3 0 3 0 3 0 0 0 0 0 0 3 0 0 3 U.S. Forest Service (USFS) 705 252 1,408 2 1,406 533 1 532 121 0 121 2,062 8 3 2,059 Natural Resources Conservation Service (NRCS)

208

Funded Projects NEPA Does Not Apply Categorical Exclusions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 31, 2010 December 31, 2010 Page 1 # of ARRA Funded Projects NEPA Does Not Apply Categorical Exclusions (CE) CE Pending CE Done Environmental Assessments (EA) EA Pending EA Done Environmental Impact Statements (EIS) EIS Pending EIS Done All NEPA Actions All Withdrawn Actions All Pending NEPA Actions All Completed NEPA Actions OVERALL TOTALS: 272,037 4,289 181,061 190 180,871 6,978 362 6,616 870 35 835 188,909 1,674 589 188,322 Department of Agriculture (USDA): 184,065 254 96,907 9 96,898 1,508 0 1,508 150 0 150 98,565 254 9 98,556 Agricultural Research Service (ARS) 41 2 38 0 38 1 0 1 0 0 0 39 0 0 39 Farm Service Agency (FSA) 86,564 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Food and Nutrition Service (FNS) 251 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Foreign Agricultural Service (FAS) 3 0 4 0 4 0 0 0 0 0 0 4 0 0 4 U.S. Forest Service (USFS) 705 252 1,408 0 1,408 533 0 533 121 0 121 2,062 8 0 2,062 Natural Resources Conservation Service (NRCS)

209

DOE-Sponsored IGCC Project Could Lead to Lower-Cost Carbon Capture...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IGCC Project Could Lead to Lower-Cost Carbon Capture Technologies DOE-Sponsored IGCC Project Could Lead to Lower-Cost Carbon Capture Technologies May 9, 2012 - 1:00pm Addthis...

210

Department of Energy Guide for Project Execution Plans - DOE...  

NLE Websites -- All DOE Office Websites (Extended Search)

5, Department of Energy Guide for Project Execution Plans by John Makepeace Functional areas: Program Management, Project Management This directive provides guidance for the...

211

DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEBoeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia DOEBoeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia Presentation by Lennie Klebanoff...

212

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project DOE Manual 435.1-1 Waste West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to Reprocessing Evaluations and Determinations West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to Reprocessing Evaluations and Determinations The U.S. Department of Energy (DOE) Manual 435.1-1, Radioactive Waste Management Manual, which accompanies DOE Order 435.1, provides that the DOE may determine that certain waste from reprocessing spent nuclear fuel is waste incidental to reprocessing, is not high-level waste and may be managed and disposed of as low-level waste if the waste meets the criteria in DOE Manual 435.1-1, Chapter II, Section B. To determine that waste is incidental to reprocessing using the evaluation process from the Manual, and shall be managed as low level waste, DOE must demonstrate three

213

National Codes and Standards Coordination - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Carl Rivkin, (Primary Contact), Chad Blake, Robert Burgess, William Buttner, and Matthew Post National Renewable Energy Laboratory (NREL) 1617 Cole Boulevard Golden, CO 80401 Phone: (303) 275-3839 Email: carl.rivkin@nrel.gov DOE Manager Antonio Ruiz Phone: (202) 586-0729 Email: Antonio.Ruiz@ee.doe.gov Subcontractors: * CSA, Standards, Cleveland, OH * FP2 Fire Protection Engineering, Golden, CO * GWS Solutions, Tolland, CT * Kelvin Hecht, Avon, CT * MorEvents, Englewood, CO * SAE International (SAE), Warrendale, PA

214

Introduction to Measurement and Verification for DOE Super ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE))

Document offers an overview of why and how measurement and verification is conducted in super energy savings performance contracts (ESPC) projects. Topics include allocating project risk, steps to verify savings, and M&V plans and reports.

215

Introduction to Measurement & Verification for DOE Super ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE))

An overview of why and how M&V is conducted in Super ESPC projects. Topics include allocating project risk, steps to verify savings, and M&V plans and reports.

216

Coordinating robot motion, sensing, and control in plans. LDRD project final report  

SciTech Connect

The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The project considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.

Xavier, P.G.; Brown, R.G.; Watterberg, P.A. [Sandia National Labs., Albuquerque, NM (United States). Intelligent Systems and Robotics Center

1997-08-01T23:59:59.000Z

217

DOE Hydrogen Pipeline R&D Project Review Meeting | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrastructure Project, Paul Wang, Concurrent Technologies Corporation (partners: Air Products, Resource Dynamics Corp., EDO Fiber Science) Natural Gas Utilities Options...

218

Coordinated Fault-Tolerance for High-Performance Computing Final Project Report  

SciTech Connect

With the Coordinated Infrastructure for Fault Tolerance Systems (CIFTS, as the original project came to be called) project, our aim has been to understand and tackle the following broad research questions, the answers to which will help the HEC community analyze and shape the direction of research in the field of fault tolerance and resiliency on future high-end leadership systems. #15; Will availability of global fault information, obtained by fault information exchange between the different HEC software on a system, allow individual system software to better detect, diagnose, and adaptively respond to faults? If fault-awareness is raised throughout the system through fault information exchange, is it possible to get all system software working together to provide a more comprehensive end-to-end fault management on the system? #15; What are the missing fault-tolerance features that widely used HEC system software lacks today that would inhibit such software from taking advantage of systemwide global fault information? #15; What are the practical limitations of a systemwide approach for end-to-end fault management based on fault awareness and coordination? #15; What mechanisms, tools, and technologies are needed to bring about fault awareness and coordination of responses on a leadership-class system? #15; What standards, outreach, and community interaction are needed for adoption of the concept of fault awareness and coordination for fault management on future systems? Keeping our overall objectives in mind, the CIFTS team has taken a parallel fourfold approach. #15; Our central goal was to design and implement a light-weight, scalable infrastructure with a simple, standardized interface to allow communication of fault-related information through the system and facilitate coordinated responses. This work led to the development of the Fault Tolerance Backplane (FTB) publish-subscribe API specification, together with a reference implementation and several experimental implementations on top of existing publish-subscribe tools. #15; We enhanced the intrinsic fault tolerance capabilities representative implementations of a variety of key HPC software subsystems and integrated them with the FTB. Targeting software subsystems included: MPI communication libraries, checkpoint/restart libraries, resource managers and job schedulers, and system monitoring tools. #15; Leveraging the aforementioned infrastructure, as well as developing and utilizing additional tools, we have examined issues associated with expanded, end-to-end fault response from both system and application viewpoints. From the standpoint of system operations, we have investigated log and root cause analysis, anomaly detection and fault prediction, and generalized notification mechanisms. Our applications work has included libraries for fault-tolerance linear algebra, application frameworks for coupled multiphysics applications, and external frameworks to support the monitoring and response for general applications. #15; Our final goal was to engage the high-end computing community to increase awareness of tools and issues around coordinated end-to-end fault management.

Panda, Dhabaleswar Kumar [The Ohio State University; Beckman, Pete

2011-07-01T23:59:59.000Z

219

DOE and USCAR Announce $70 Million Project to Accelerate Development...  

Office of Environmental Management (EM)

Secretary of Energy Samuel Bodman said. "This research will help to reduce oil usage and reduce emissions, while maintaining the highest of safety standards." DOE's...

220

DOE Selects Contractor for Depleted Hexafluoride Conversion Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and two one-year extension options. Navarro Research and Engineering Inc. will provide engineering and operations technical support services to the DOE Portsmouth Paducah...

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE Announces Webinars on Successful Project Financing Mechanisms...  

Office of Environmental Management (EM)

shares his experience bringing 90 propane school buses and three propane fueling stations to the fleet. View the past webcast. Addthis Related Articles DOE Announces...

222

EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Facility Operations at the U.S. DOE Grand Junction 30: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD June 8, 1996 EA-0930: Finding of No Significant Impact Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand

223

DOE-Funded Research Projects Win 41 R&D 100 Awards for 2006 | U.S. DOE  

Office of Science (SC) Website

DOE-Funded DOE-Funded Research Projects Win 41 R&D 100 Awards for 2006 News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.19.06 DOE-Funded Research Projects Win 41 R&D 100 Awards for 2006 Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON , DC - Secretary of Energy Samuel W. Bodman today congratulated researchers at 12 DOE national laboratories who won 41 of the 100 awards given by R&D Magazine. The awards are presented annually in recognition of the most outstanding technology developments with commercial potential. R&D Magazine will make the awards tonight at its 44th annual R&D

224

DOE Funded Research Projects Win 30 R&D 100 Awards for 2008 | U.S. DOE  

Office of Science (SC) Website

DOE Funded DOE Funded Research Projects Win 30 R&D 100 Awards for 2008 News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 07.22.08 DOE Funded Research Projects Win 30 R&D 100 Awards for 2008 Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman announced today that researchers from the U.S. Department of Energy's (DOE) National Laboratories and Y-12 National Security Complex have won 30 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted

225

Project Assessment (OPA) Homepage | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

OPA Home OPA Home Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov 2012 Project Management Awards Secretary's Award of Excellence Building 51 and Bevatron Demolition Project at LBNLRead More Bevatron 2012 Project Management Awards Secretary's Award of Achievement Daya Bay Reactor Neutrino Detector Project at LBNLRead More Daya Bay 2012 Project Management Awards Federal Project Director of the Year Hannibal Joma, Federal Project Director for the LUSI Project at SLACRead More Hannibal 1 of 2 Print

226

DOE/EA-1644: Kildeer to Mountain Transmission Project Pre-Decisional Environmental Assessment (May 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KILLDEER TO MOUNTAIN KILLDEER TO MOUNTAIN TRANSMISSION PROJECT PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT MAY 5, 2009 DOE/EA-1644 PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT KILLDEER TO MOUNTAIN PAGE i MAY 2009 TRANSMISSION PROJECT DOE/EA -1644 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................. 1-1 1.1 Purpose of and Need for Action ........................................................................................... 1-1 1.1.1 Project Purpose ............................................................................................................ 1-1 1.1.2 Western's Purpose and Need ..................................................................................... 1-1

227

DOE EM Project Experience & Lessons Learned for In Situ Decommissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Project Experience & Lessons Learned for In Situ EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of the "DOE EM Project Experience & Lessons Learned for In Situ Decommissioning" report is to capture the considerable technical experience gained to date for implementation of In Situ Decommissioning (ISD) projects at DOE facilities. As current and projected budgets for the EM program indicate reduced and flat funding profiles for the foreseeable future, the potential exists for this institutional knowledge to be lost as the ramp-down of project staffing commences with the cessation of ARRA. EM's Office of Deactivation & Decommissioning and Facility Engineering

228

Various Project Management Reports | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Various Project Management Reports Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Processes and Procedures Various Project Management Reports Print Text Size: A A A RSS Feeds FeedbackShare Page Government Accountability Office (GAO) GAO-10-199, DOE: Actions Needed to Develop High-Quality Cost

229

Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

broad user community and, during construction, are maintained on schedule and within cost. Furthermore, the construction projects adhere to the highest standards of safety....

230

Geologic Carbon Dioxide Storage Field Projects Supported by DOE...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

United States and other countries including, Canada, Algeria, Norway, Australia, and Germany. The program has also been supporting a number of complementary R&D projects...

231

DOE Announces $14 Million Industry Partnership Projects to Increase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

particulate matter and nitrous oxides sensors suitable to support an exhaust gas recirculation control system in diesel engines. The project will include validation and...

232

DOE Announces Webinars on Tribal Energy Project Financing, Building...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to tribal communities. Speakers include Jason Coughlin, project leader at the Energy Department's National Renewable Energy Laboratory and Bill Cornelius, formerly with...

233

DOE intends to extend the Advanced Mixed Waste Treatment Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Mixed Waste Treatment Project contract for four months as competition for long-term contract continues. Scene from inside the Advanced Mixed Waste Treatment Facility....

234

Integrated Project Teams Guide for Use with DOE O 413. 3A  

Directives, Delegations, and Requirements

This Guide provides those responsible for program and project management with the information and perspective needed to successfully implement the requirements of DOE O 413.3A relating to the use of integrated project teams to achieve improved project outcomes and efficiency.

2008-09-24T23:59:59.000Z

235

DOE Announces $60 Million in Projects to Accelerate Scientific...  

Energy Savers (EERE)

- 8:53am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science today announced approximately 60 million in new awards annually for 30 computational...

236

DOE Launches the Advanced Research Projects Agency-Energy, or...  

Office of Environmental Management (EM)

Agency-Energy (ARPA-E) on April 27 as part of a sweeping announcement about federal investment in research and development and science education. ARPA-E is a new DOE organization...

237

DOE, Washington Closure complete recycling project at Hanford  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. The U.S. Department of Energy (DOE) recently teamed with contractor Washington Closure Hanford to complete a major recycling effort during cleanup of the Hanford Site in southeastern Washington State.

238

Innovative Texas Clean Coal Project Takes Major Step Forward as DOE Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Texas Clean Coal Project Takes Major Step Forward as DOE Texas Clean Coal Project Takes Major Step Forward as DOE Issues Record of Decision Innovative Texas Clean Coal Project Takes Major Step Forward as DOE Issues Record of Decision September 27, 2011 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has issued a Record of Decision (ROD) that - along with a signed cooperative agreement - will allow federal funding to be used to help build one of the world's most advanced and environmentally clean coal-based power plants. The ROD and cooperative agreement between DOE's Office of Fossil Energy (FE) and Summit Texas Clean Energy, LLC (STCE) sets in motion continued federal cost-shared funding for the Summit Texas Clean Energy Project, to be built just west of Midland-Odessa, Texas. This 400-megawatt,

239

DOE funds projects on hydrogen storage, fuel cell manufacturing  

Science Journals Connector (OSTI)

Three hydrogen and fuel cell projects in Colorado, California, and New Jersey are to receive funding from the US Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE). The projects are among the recently announced FY 2012 Small Business Innovation Research and Small Business Technology Transfer (SBIR/STTR) Phase I Release 3 awards.

2013-01-01T23:59:59.000Z

240

DOE passive solar commercial buildings program: project summaries  

SciTech Connect

The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

Not Available

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DOE-TSPP-4, Registering a Technical Standard Project - August 1, 2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, Registering a Technical Standard Project - August 1, 4, Registering a Technical Standard Project - August 1, 2000 DOE-TSPP-4, Registering a Technical Standard Project - August 1, 2000 Technical Standards Program Procedures (TSPP) This procedure outlines the process for registering a project to develop a DOE Technical Standard, to perform certain periodic updates (revisions, reaffirmations, inactivations for new design, and reinstatements) to DOE Technical Standards, or to register a person's or organization's intent to work with a non-Government standards body to prepare or revise a non-Government standard. The procedure also describes the approval process required before a project can be registered. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories

242

DOE and USDA Select Projects for more than $24 Million in Biomass Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE and USDA Select Projects for more than $24 Million in Biomass DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants November 12, 2009 - 12:00am Addthis Washington, DC - The U.S. Departments of Agriculture and Energy today announced projects selected for more than $24 million in grants to research and develop technologies to produce biofuels, bioenergy and high-value biobased products. Of the $24.4 million announced today, DOE plans to invest up to $4.9 million with USDA contributing up to $19.5 million. Advanced biofuels produced through this funding are expected to reduce greenhouse gas emissions by at least 50 percent compared to fossil fuels. "The selected projects will help make bioenergy production from renewable

243

Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture from Coal Power Plants Ten Projects Selected by DOE to Advance State-of-the-Art Carbon Capture from Coal Power Plants July 7, 2010 - 1:00pm Addthis Washington, DC - Ten projects aimed at developing advanced technologies for capturing carbon dioxide (CO2) from coal combustion have been selected by the U.S. Department of Energy (DOE) under its Innovations for Existing Plants (IEP) Program. Valued at approximately $67 million ($15 million in non-federal cost sharing) over three years, the projects are focused on reducing the "energy and efficiency penalties" associated with applying currently available carbon capture and storage (CCS) technologies to existing and new power plants.

244

DOE-TSPP-4, Registering a Technical Standard Project - July 1, 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, Registering a Technical Standard Project - July 1, 2009 , Registering a Technical Standard Project - July 1, 2009 DOE-TSPP-4, Registering a Technical Standard Project - July 1, 2009 Technical Standards Program Procedures (TSPP) - August 26, 2009 This procedure outlines the process for registering a project to develop a DOE Technical Standard, to perform certain periodic updates (revisions, reaffirmations, inactivations for new design, and reinstatements) to DOE Technical Standards, or to register a person's or organization's intent to work with a non-Government standards body to prepare or revise a non-Government standard. The procedure also describes the approval process required before a project can be registered. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories

245

DOE Announces up to $29.3 Million in Projects for Research, Development,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

up to $29.3 Million in Projects for Research, up to $29.3 Million in Projects for Research, Development, and Demonstration of Alternative Vehicle Technologies DOE Announces up to $29.3 Million in Projects for Research, Development, and Demonstration of Alternative Vehicle Technologies December 3, 2008 - 4:58pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of six cost-shared research projects for the development and demonstration of alternative vehicle technology projects totaling a DOE investment of up to $14.55 million over three years, subject to annual appropriations. Private sector contributions will further increase the financial investment for a total of up to $29.3 million. The selections announced today are part of DOE's continuing work to develop high

246

DOE Selects 53 New Projects Focused on Wind Energy for up to $8.5 Million |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 New Projects Focused on Wind Energy for up to $8.5 53 New Projects Focused on Wind Energy for up to $8.5 Million DOE Selects 53 New Projects Focused on Wind Energy for up to $8.5 Million May 6, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Steven Chu today announced selection of 53 new wind energy projects for up to $8.5 million in total DOE funding. These projects will help begin to address market and deployment challenges identified in DOE's 2008 report: "20% Wind Energy by 2030." Increasing wind energy generation will be a critical factor in achieving the Obama Administration's goals for clean energy, while also supporting new green jobs. Secretary Chu made the announcement by video at the WindPower 2009 Conference in Chicago this week. "Wind energy is one of our most promising renewable energy sources," said

247

Moab Mill Tailings Pile 25 Percent Disposed: DOE Moab Project Reaches  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mill Tailings Pile 25 Percent Disposed: DOE Moab Project Mill Tailings Pile 25 Percent Disposed: DOE Moab Project Reaches Significant Milestone Moab Mill Tailings Pile 25 Percent Disposed: DOE Moab Project Reaches Significant Milestone June 3, 2011 - 12:00pm Addthis Media Contacts Donald Metzler Moab Federal Project Director (970) 257-2115 Wendee Ryan S&K Aerospace Public Affairs Manager (970) 257-2145 Grand Junction, CO - One quarter of the uranium mill tailings pile located in Moab, Utah, has been relocated to the Crescent Junction, Utah, site for permanent disposal. Four million tons of the 16 million tons total has been relocated under the Uranium Mill Tailings Remedial Action Project managed by the U.S. Department of Energy (DOE). A little over 2 years ago, Remedial Action Contractor EnergySolutions began

248

6 Million Tons of Mill Tailings Removed From DOE Moab Project Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Million Tons of Mill Tailings Removed From DOE Moab Project Site 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site June 18, 2013 - 12:00pm Addthis Media Contacts Donald Metzler, Moab Federal Project Director (970) 257-2115 Wendee Ryan, S&K Aerospace Public Affairs Manager (970) 257-2145 (Grand Junction, CO) - Today, the Department of Energy (DOE) announced that 6 million tons of uranium mill tailings have been shipped from Moab, Utah, under the Uranium Mill Tailings Remedial Action Project to an engineered disposal cell near Crescent Junction, Utah. The shipments mark continued progress toward relocating the 16-million-ton uranium mill tailings pile away from the Colorado River. "The federal budget continues to be stretched thin, and I am proud this

249

6 Million Tons of Mill Tailings Removed From DOE Moab Project Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Million Tons of Mill Tailings Removed From DOE Moab Project Site 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site June 18, 2013 - 12:00pm Addthis Media Contacts Donald Metzler, Moab Federal Project Director (970) 257-2115 Wendee Ryan, S&K Aerospace Public Affairs Manager (970) 257-2145 (Grand Junction, CO) - Today, the Department of Energy (DOE) announced that 6 million tons of uranium mill tailings have been shipped from Moab, Utah, under the Uranium Mill Tailings Remedial Action Project to an engineered disposal cell near Crescent Junction, Utah. The shipments mark continued progress toward relocating the 16-million-ton uranium mill tailings pile away from the Colorado River. "The federal budget continues to be stretched thin, and I am proud this

250

DOE Awards Supercomputer Access to Cutting-Edge Projects | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supercomputer Access to Cutting-Edge Projects Supercomputer Access to Cutting-Edge Projects DOE Awards Supercomputer Access to Cutting-Edge Projects December 18, 2008 - 8:51am Addthis WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science announced today that 66 projects addressing some of the greatest scientific challenges have been awarded access to some of the world's most powerful supercomputers at DOE national laboratories. The projects-competitively selected for their technical readiness and scientific merit-will advance research in key areas such as astrophysics, climate change, new materials, energy production and biology, and thereby advance U.S. competitiveness. "From understanding the makeup of our universe to protecting the quality of life here on earth, the computational science now possible using DOE's

251

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Ames Site Office (AMSO) AMSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Ames Laboratory Sensitive Instrument Facility Project Description This project will construct a Sensitive Instrument Facility (SIF) that will provide six instrument bays, sample preparation space, control rooms, and staff support space. The instrument bays will provide vibration isolation, acoustic separation and control, electromagnetic interference (EMI) control, strict control of air flow and strict ambient temperature and

252

DOE Office of Indian Energy Tribal Renewable Energy Project Development and Financing Essentials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Renewable Energy Project Tribal Renewable Energy Project Development and Financing Essentials Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in Indian Country. 2 About the Speaker Elizabeth Doris * Senior Project Leader at the National Renewable Energy Laboratory (NREL) * Specializes in strategies for developing clean energy technologies in public and private markets * Project manager for the DOE Office of Indian Energy project team at NREL 3 Why Complete a Renewable Energy Project?

253

Fuel Modelling at Extended Burnup: IAEA Coordinated Research Project FUMEX-II  

SciTech Connect

The International Atomic Energy Agency sponsored a Coordinated Research Project on Fuel Modelling at Extended Burnup (FUMEX-II). Eighteen fuel modelling groups participated with the intention of improving their capabilities to understand and predict the behaviour of water reactor fuel at high burnups. The exercise was carried out in coordination with the OECD/NEA. The participants used a mixture of data derived from actual irradiation histories of high burnup experimental fuel and commercial irradiations where post-irradiation examination measurements are available, combined with idealised power histories intended to represent possible future extended dwell commercial irradiations and test code capabilities at high burnup. All participants have been asked to model nine priority cases out of some 27 cases made available to them for the exercise from the IAEA/OECD International Fuel Performance Experimental Database. Calculations carried out by the participants, particularly for the idealised cases, have shown how varying modelling assumptions affect the high burnup predictions, and have led to an understanding of the requirements of future high burnup experimental data to help discriminate between modelling assumptions. This understanding is important in trying to model transient and fault behaviour at high burnup. It is important to recognise that the code predictions presented here should not be taken to indicate that some codes do not perform well. The codes have been designed for different applications and have differing assumptions and validation ranges; for example codes intended to predict Candu fuel operation with thin wall collapsible cladding do not need the clad creep and gap conductivity modelling found in PWR codes. Therefore, when a case is based on Candu technology or PWR technology, it is to be expected that the codes may not agree. However, it is the very differences in such behaviour that is useful in helping to understand the effects of such internal modelling. (authors)

Killeen, J.C. [International Atomic Energy Agency, Wagramerstrasse 5, PO Box 100, A-1400 Vienna (Austria); Turnbull, J.A. [Cherry-Lyn, Tockington, South Glos (United Kingdom); Sartori, E. [OECD/NEA, 12 Bd des Iles, 92130 Issy-les-Moulineaux (France)

2007-07-01T23:59:59.000Z

254

Construction Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Construction Construction Projects Scientific User Facilities (SUF) Division SUF Home About User Facilities Accelerator & Detector Research & Development Principal Investigators' Meetings Scientific Highlights Construction Projects BES Home Construction Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Experiments in support of basic research require that state-of-the-art facilities are built or existing facilities are modified to meet unique research requirements and keep the U.S. scientific enterprise world leading. Reactors, x-ray light sources, and pulsed neutron sources are among the expensive, but necessary, facilities required, and the BES program funds for the construction and modification of these facilities. The BES construction projects are conceived and planned with the broad user

255

Current Projects | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Current Projects Fermi Site Office (FSO) FSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630) 840-3285 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page FSO provides vital oversight to proposed and ongoing science and infrastructure projects at Fermilab. The latest developments in accelerator and detector technology make possible promising new scientific opportunities in neutrino science, as well as in experiments to measure rare processes, using high intensity particle beams. The United States is building on the unique capabilities and infrastructure at Fermilab, with a

256

The Chuva Project: How Does Convection Vary across Brazil?  

Science Journals Connector (OSTI)

CHUVA, meaning rain in Portuguese, is the acronym for the Cloud Processes of the Main Precipitation Systems in Brazil: A Contribution to Cloud-Resolving Modeling and to the Global Precipitation Measurement (GPM). The CHUVA project has conducted five ...

Luiz A. T. Machado; Maria A. F. Silva Dias; Carlos Morales; Gilberto Fisch; Daniel Vila; Rachel Albrecht; Steven J. Goodman; Alan J. P. Calheiros; Thiago Biscaro; Christian Kummerow; Julia Cohen; David Fitzjarrald; Ernani L. Nascimento; Meiry S. Sakamoto; Christopher Cunningham; Jean-Pierre Chaboureau; Walter A. Petersen; David K. Adams; Luca Baldini; Carlos F. Angelis; Luiz F. Sapucci; Paola Salio; Henrique M. J. Barbosa; Eduardo Landulfo; Rodrigo A. F. Souza; Richard J. Blakeslee; Jeffrey Bailey; Saulo Freitas; Wagner F. A. Lima; Ali Tokay

2014-09-01T23:59:59.000Z

257

Presentations from the 2012 DOE Project Management Workshop  

Energy.gov (U.S. Department of Energy (DOE))

Please see below for copies of the presentations given at the the 2012 Department of Energy Project Management Workshop on April 3 & 4, 2012. Permission to post has not been recceived for some...

258

Applicant Location Requested DOE Funds Project Summary Feasibility...  

Energy Savers (EERE)

White Earth, MN 247,118 This project will assess the feasibility of deploying a biogasbiomass-fired combined heat and power facility to generate 2.7 MW of electricity for...

259

DOE Order Program and Project Management for the Acquisition...  

Office of Environmental Management (EM)

is to provide the Department of Energy's federal project directors (FPDs) with the knowledge, methodologies and tools needed to meet Order 413.3A's requirement that they plan,...

260

Advanced Combustion Systems Project Information | netl.doe.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

FC26-07NT43088 Recovery Act: Oxy-combustion: Oxygen Transport Membrane Development Praxair, Inc. Completed Projects FE0009686 High Efficiency Molten-Bed Oxy-Coal Combustion...

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

FUSRAP - 45 DOE cleanup projects across the country  

SciTech Connect

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is a U.S. Department of Energy (DOE) program designed to address radiological contamination exceeding acceptable cleanup standards at 45 sites throughout the United States. The DOE and its predecessor agencies, the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC), used many of these sites for processing and storing uranium and thorium ores as part of the nation`s early nuclear production activities. While some of the sites are owned by the federal government, most of the sites were, and are, privately owned.

Price, L.K. [Dept. of Energy, Oak Ridge, TN (United States); Harbert, R.R.; Palau, G.L.

1994-12-31T23:59:59.000Z

262

Emergence of Collaborative Projects and Coalitions: a Framework for Coordination in  

E-Print Network (OSTI)

the efficiency of ICT use in disaster relief through greater coordination. These ICT coordination bodies may significantly on their organizational designs, 1 Pseudonyms are used to protect the confidentiality understand how changes to the organizational designs of coordination bodies might improve their effectiveness

263

Project Listings by State, DOE Hydrogen Program FY 2010 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2010 Annual Progress Report DOE Hydrogen Program Alabama V.B.2 CFD Research Corp.: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 V.B.2 ESI US R&D: Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .711 Alaska VIII.9 Tanadgusix Foundation: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 TDX Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1288 VIII.9 Alaska Center for Energy and Power: TDX Foundation Hydrogen Project/PEV Project . . . . . . . . . 1288

264

Decentralized coordination through digital technology, dynamic pricing, and Customer-Driven control: the GridWise testbed demonstration project  

SciTech Connect

The project highlights the idea that technology-enabled decentralized coordination can achieve the same, or better, economic and reliability benefits when compared to utility-focused centralized physical and economic control. Among the design's unique features was a retail double auction with five-minute market-clearing intervals that included residential customers as direct, active market participants. (author)

Chassin, David P.; Kiesling, Lynne

2008-10-15T23:59:59.000Z

265

DOE-Sponsored IGCC Project in Texas Takes Important Step Forward |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Sponsored IGCC Project in Texas Takes Important Step Forward DOE-Sponsored IGCC Project in Texas Takes Important Step Forward DOE-Sponsored IGCC Project in Texas Takes Important Step Forward June 20, 2011 - 1:00pm Addthis Washington, DC - A newly signed memorandum of understanding (MOU) for the purchase of electricity produced by the Texas Clean Energy Project (TCEP) is an important step forward for what will be one of the world's most advanced and cleanest coal-based power plants, funded in part by the U.S. Department of Energy (DOE). Under the MOU, CPS Energy - a municipally owned utility serving San Antonio, Texas - will purchase electricity generated by the first-of-a-kind commercial clean coal power plant, starting in mid 2014. TCEP, a 400-megawatt integrated gasification combined cycle (IGCC) facility located

266

DOE Moab Project Safely Removes 7 Million Tons of Mill Tailings  

Energy.gov (U.S. Department of Energy (DOE))

(Grand Junction, CO) ? The U.S. Department of Energy (DOE) has safely moved another million tons of uranium mill tailings from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project.

267

DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting  

Energy.gov (U.S. Department of Energy (DOE))

On February 8-9, 2005, the Department of Energy held the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting at Argonne National Laboratory. The purpose of the meeting was...

268

DOE Regional Tribal Energy Project Development and Finance Workshops to be Held this Summer  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Office of Indian Energy and Tribal Energy Program are hosting a series of interactive workshops this summer for tribal leaders and staff focused on developing commercial-, community-, and facility-scale renewable energy projects on tribal lands.

269

Various Project Management Reports | U.S. DOE Office of Science...  

Office of Science (SC) Website

903-8520 E: sc.opa@science.doe.gov Processes and Procedures Various Project Management Reports Print Text Size: A A A FeedbackShare Page Government Accountability Office (GAO)...

270

DOE Offers Conditional Commitment to Cape Wind Offshore Wind Generation Project  

Energy.gov (U.S. Department of Energy (DOE))

DOE recently announced the first step toward issuing a $150 million loan guarantee to support the construction of the Cape Wind offshore wind project with a conditional commitment to Cape Wind Associates, LLC.

271

DOE Office of Environmental Management Project and Contract Management Improvement Timeline  

Energy.gov (U.S. Department of Energy (DOE))

Improving DOE contract and project management is a top priority of the Departments seniormanagement and entire organization. View some highlights of EMs improvementactions here.

272

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects SLAC Site Office (SSO) SSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Linear Coherent Light Source (LCLS)-II will add two new X-ray laser beams and room for additional new instruments, greatly increasing the number of experiments carried out each year. Its new capabilities will allow scientists to do important research that cannot be done anywhere today, including work in drug development, energy science and advanced materials. https://portal.slac.stanford.edu/sites/lcls_public/lcls_ii/Pages/default.aspx External link

273

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Princeton Site Office (PSO) PSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page National Spherical Torus Experiment (NSTX) The National Spherical Torus Experiment (NSTX) at the U.S. Department of Energy's Princeton Plasma Physics Laboratory (PPPL) is yielding research results that may open an attractive path towards developing fusion energy as an abundant, safe, affordable and environmentally sound means of generating electricity. The NSTX device is exploring a novel structure for the magnetic field used to contain the hot ionized gas, called

274

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Pacific Northwest Site Office (PNSO) PNSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page F&O delivers unique facilities to house highly sophisticated collections of equipment. EMSL's new $4.5 million Radiochemistry Annex opens for science and research at the end of April, 2013. The four thousand square foot annex enables studies of contaminated environmental materials and examination of radionuclides and chemical signatures. Radiochemistry Annex Modernization of the Aquatic Research Laboratory (ARL) delivered a flexible

275

DOE Funds 15 New Projects to Develop Solar Power Storage and Heat Transfer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funds 15 New Projects to Develop Solar Power Storage and Heat Funds 15 New Projects to Develop Solar Power Storage and Heat Transfer Projects For Up to $67.6 Million DOE Funds 15 New Projects to Develop Solar Power Storage and Heat Transfer Projects For Up to $67.6 Million September 19, 2008 - 3:43pm Addthis WASHINGTON - U.S. Department of Energy (DOE) today announced selections for negotiations of award under the Funding Opportunity Announcement (FOA), Advanced Heat Transfer Fluids and Novel Thermal Storage Concepts for Concentrating Solar Power Generation. These 15 new projects, for up to approximately $67.6 million, will facilitate the development of lower-cost energy storage for concentrating solar power (CSP) technology. These projects support President Bush's Solar America Initiative, which aims to make solar energy cost-competitive with conventional forms of electricity

276

Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2003 2, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01) TO: Greg Baesler Project Manager - KEWU-4 Proposed Action: Colville Resident Trout Hatchery Project-Modifications to original proposal Project No.: 1985-038-00 Location: Colville Indian Reservation, Okanogan County, Washington Proposed by: Bonneville Power Administration (BPA) Introduction: The Bonneville Power Administration prepared an Environmental Assessment (DOE/EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a

277

IAEA coordinated research project on thermal-hydraulics of Supercritical Water-Cooled Reactors (SCWRs)  

SciTech Connect

The Supercritical Water-Cooled Reactor (SCWR) is an innovative water-cooled reactor concept, which uses supercritical pressure water as reactor coolant. It has been attracting interest of many researchers in various countries mainly due to its benefits of high thermal efficiency and simple primary systems, resulting in low capital cost. The IAEA started in 2008 a Coordinated Research Project (CRP) on Thermal-Hydraulics of SCWRs as a forum to foster the exchange of technical information and international collaboration in research and development. This paper summarizes the activities and current status of the CRP, as well as major progress achieved to date. At present, 15 institutions closely collaborate in several tasks. Some organizations have been conducting thermal-hydraulics experiments and analysing the data, and others have been participating in code-to-test and/or code-to-code benchmark exercises. The expected outputs of the CRP are also discussed. Finally, the paper introduces several IAEA activities relating to or arising from the CRP. (authors)

Yamada, K. [Vienna International Centre, P.O. Box 100, 1400 Vienna (Austria); Aksan, S. N. [International Atomic Energy Agency, 1400 Vienna (Austria)

2012-07-01T23:59:59.000Z

278

DOE Selects Biofuels Projects to Receive up to $21 Million in Funding |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Biofuels Projects to Receive up to $21 Million in DOE Selects Biofuels Projects to Receive up to $21 Million in Funding DOE Selects Biofuels Projects to Receive up to $21 Million in Funding August 31, 2009 - 12:00am Addthis WASHINGTON, DC- U.S. Department of Energy Secretary Steven Chu announced today that up to $21 million will be made available for the selection of five projects that will develop supply systems to handle and deliver high tonnage biomass feedstocks for cellulosic biofuels production. The awards announced today are part of the department's ongoing efforts to reduce U.S. dependence on foreign oil, spur the creation of the domestic bio-industry and provide new jobs in many rural areas of the country. "Biofuels will play an important role in America's clean energy portfolio," Secretary Chu said. "These projects will allow us to decrease our

279

NETL: News Release - DOE Selects Projects to Minimize Freshwater Use in  

NLE Websites -- All DOE Office Websites (Extended Search)

November 21, 2005 November 21, 2005 DOE Selects Projects to Minimize Freshwater Use in Coal-Fired Power Plants WASHINGTON, DC- As part of an expanding effort to address the critical link between energy and water, the U.S. Department of Energy (DOE) has selected seven projects aimed at reducing the amount of freshwater needed by coal-fired power plants. Under DOE's Innovations for Existing Plants program, which is designed to enhance the environmental performance of existing coal-fired power plants, the Energy Department and its research partners will cost-share in a broad mix of projects with a total value of more than $5 million. The projects will be managed by the Office of Fossil Energy's National Energy Technology Laboratory. MORE INFO Learn more about the 2003 project selections

280

DOE Announces 1st Projects to Meet President's Clean Coal Commitment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces 1st Projects to Meet President's Clean Coal DOE Announces 1st Projects to Meet President's Clean Coal Commitment DOE Announces 1st Projects to Meet President's Clean Coal Commitment January 15, 2003 - 8:58am Addthis Washington, DC - Secretary of Energy Spencer Abraham today announced the first eight projects chosen by the Department of Energy in the initial phase of President Bush's Clean Coal Power Initiative. The projects, valued at more than $1.3 billion, are expected to help pioneer a new generation of innovative power plant technologies that could help meet the President's Clear Skies and Climate Change initiatives. "The level of interest expressed in the first competition was tremendous," Secretary Abraham said. "That is a clear indication of the potential to develop and apply technology to improve our energy security through the use

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

NETL: News Release - DOE-Sponsored Mississippi Project Hits 1-Million-Ton  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2009 5, 2009 DOE-Sponsored Mississippi Project Hits 1-Million-Ton Milestone for Injected CO2 Project Helping Further CCS Technology and Meeting G-8 Goals for Deployment Washington, D.C. -A large-scale carbon dioxide (CO2) storage project in Mississippi has become the fifth worldwide to reach the important milestone of more than 1 million tons injected. As a result, it is helping to both further carbon capture and storage (CCS) as a mitigation strategy for global climate change and move forward G-8 recommendations for launching 20 projects of this type internationally by 2010. MORE INFO Learn more about DOE's Regional Carbon Sequestration Partnership Program Link to SECARB web site The project, sponsored by the U.S. Department of Energy's (DOE) Office of Fossil Energy (FE), is located at the Cranfield site in Southwestern

282

DOE Selects 3 Small-Scale Biorefinery Projects for up to $86 Million of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Small-Scale Biorefinery Projects for up to $86 3 Small-Scale Biorefinery Projects for up to $86 Million of Federal Funding in Maine, Tennessee and Kentucky DOE Selects 3 Small-Scale Biorefinery Projects for up to $86 Million of Federal Funding in Maine, Tennessee and Kentucky April 18, 2008 - 10:49am Addthis Projects Demonstrate Continued Commitment to Advancing Development of Sustainable, Cost-Competitive Cellulosic Ethanol ALEXANDRIA, VA. - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the competitive selection of three projects in which DOE plans to invest up to $86 million over four years (FY '08 - '11) to support the development of small-scale cellulosic biorefineries in Old Town, ME; Vonore, TN; and Washington County, KY. This funding will further President Bush's goal of making cellulosic ethanol cost-competitive by

283

2014 DOE Project Management Workshop Meeting the Challenge-Integrated...  

Energy Savers (EERE)

and Project Management 8:05 - 8:45 James Webb Space Telescope: PM Lessons Applied Eric Smith, Deputy Program Director, NASA 8:45 - 9:00 9:00 - 9:45 Victor Carter-Bey (PMI) 9:45 -...

284

DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, D.C. The Energy Department recently signed a notice of intent to prepare an environmental assessment to analyze the potential environmental impacts from a proposed project to accept used nuclear fuel from the Federal Republic of Germany at DOEs Savannah River Site (SRS) for processing and disposition.

285

DOE/EIS-0324; Umatilla Generating Project (082001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Umatilla Generating Company Umatilla Generating Company UMATILLA GENERATING PROJECT Project Location Map March 2001 Figure 2.1 N S S U m a tilla R . Umatilla Hermiston " # 1 $ " # 0 $ 0.5 0 0.5 1 Kilometers 0.5 0 0.5 1 Miles GTN Intertie BPA Interconnection Point Existing Transmission Line to be Reconductored Water and Gas Pipeline Corridor New Transmission Line on New Towers Existing Transmission Line to be Reconductored Proposed GTN Gas Pipeline Alternative 1 Proposed GTN Gas Pipeline Alternative 2 Proposed CNG Gas Pipeline Alternative Existing PG&E GTN Mainline Power Plant Site Hermiston Generating Plant Water and Gas Pipeline Corridor Print Date: March 28, 2001 k:\umatilla_new\apr\eis_sec2.apr 1:55000 Umatilla Chemical Depot Co lu m b ia R iv e r Hermiston Pendleton Portland Eugene " # / $ ) 9 " # 1 $ Overview of Location in the State of Oregon

286

Performance of DOE's micellar-polymer project in northwest Oklahoma  

SciTech Connect

DOE's Bartlesville Energy Technology Center has completed a micellar-polymer flood in the Delaware Childers Field in NE Oklahoma. Micellar-polymer flooding uses a combination of low interfacial tension and mobility control in producing reservoir that usually has been successfully waterflood. A test site was selected after consideration of other possible sites reasonably close to BETC. The selected micellar-polymer fluids were injected into a central injection well, displaced through the formation, and produced from four surrounding production wells. Eight water injection wells surrounding the test pattern were used to afford an effective outer boundary for fluid containment. 9 refs.

Thomas, R.D.; Spence, K.L.; Burtch, F.W.; Lorenz, P.B.

1982-01-01T23:59:59.000Z

287

DOE/EA-1663: Environmental Assessment for BP Solar Array Project Brookhaven National Laboratory (December 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP SOLAR ARRAY PROJECT BP SOLAR ARRAY PROJECT BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK Brookhaven Site Office December 2009 DOE/EA-1663 i Table of Contents 1.0 PREFACE ........................................................................................................................... 1 2.0 SUMMARY.......................................................................................................................... 2 3.0 PURPOSE AND NEED .................................................................................................... 12

288

DOE-Funded Research Projects Win 35 R&D 100 Awards for 2003 | U.S. DOE  

Office of Science (SC) Website

35 R&D 100 Awards for 2003 35 R&D 100 Awards for 2003 About Organization Budget Field Offices Federal Advisory Committees History Scientific and Technical Information Honors & Awards Presidential Early Career Awards for Scientists and Engineers (PECASE) The Enrico Fermi Award The Ernest Orlando Lawrence Award DOE Nobel Laureates Federal Laboratory Consortium Excellence in Technology Transfer Award R&D 100 Awards Jobs Brochures, Logos, & Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 R&D 100 Awards DOE-Funded Research Projects Win 35 R&D 100 Awards for 2003 Print Text Size: A A A RSS Feeds FeedbackShare Page Thirty-five research projects funded by the U.S. Department of Energy have

289

DOE-Sponsored Mississippi Project Hits 1-Million-Ton Milestone for Injected  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mississippi Project Hits 1-Million-Ton Milestone for Mississippi Project Hits 1-Million-Ton Milestone for Injected CO2 DOE-Sponsored Mississippi Project Hits 1-Million-Ton Milestone for Injected CO2 November 5, 2009 - 12:00pm Addthis Washington, DC - A large-scale carbon dioxide (CO2) storage project in Mississippi has become the fifth worldwide to reach the important milestone of more than 1 million tons injected. As a result, it is helping to both further carbon capture and storage (CCS) as a mitigation strategy for global climate change and move forward G-8 recommendations for launching 20 projects of this type internationally by 2010. The project, sponsored by the U.S. Department of Energy's (DOE) Office of Fossil Energy (FE), is located at the Cranfield site in Southwestern Mississippi. It is led by the Southeast Regional Carbon Sequestration

290

Third Buried Waste Retrieval Project under way at DOE Idaho Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Third Buried Waste Retrieval Project under way at DOE Idaho Site Third Buried Waste Retrieval Project under way at DOE Idaho Site The Idaho Cleanup Project has recently begun removing Cold War weapons waste from a third retrieval area at the Department of Energy�s Radioactive Waste Management Complex (RWMC) in eastern Idaho. Inside Project III enclosure An inside view of the Accelerated Retrieval Project III enclosure Click on image for larger picture The Accelerated Retrieval Project-III (ARP-III) began retrieving targeted waste consisting of plutonium-contaminated filters, graphite molds, solidified radioactively and organically contaminated sludges and oxidized uranium material on December 10, 2008. These materials originated at the Rocky Flats Plant near Denver, Colorado, during nuclear weapons production activities in the 1960s and were packaged in drums and sent to Idaho for

291

DOE Selects Projects for up to $50 Million of Federal Funding to Modernize  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Projects for up to $50 Million of Federal Funding to Selects Projects for up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid DOE Selects Projects for up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid April 21, 2008 - 1:43pm Addthis Demonstration Projects Aim at 15 Percent Reduction of U.S. Peak Load Electricity Demand Washington, DC- U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin Kolevar today announced the Department's plans to invest up to $50 million over five years (Fiscal Years 2008 - 2012), subject to appropriations from Congress, in nine demonstration projects competitively selected to increase efficiency in the nation's electricity grid. The Renewable and Distributed Systems Integration (RDSI) technologies demonstrated in these projects aim to

292

DOE Selects Five Ethanol Conversion Projects for $23 Million in Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Ethanol Conversion Projects for $23 Million in Five Ethanol Conversion Projects for $23 Million in Federal Funding DOE Selects Five Ethanol Conversion Projects for $23 Million in Federal Funding March 27, 2007 - 12:10pm Addthis Projects to Develop Fermentative Organisms to Speed Ethanol Refining WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Energy Efficiency and Renewable Energy Alexander Karsner today announced just over $23 million in federal funding, subject to negotiation of final project plans and funding, for five projects focused on developing highly efficient fermentative organisms to convert biomass material to ethanol. This research will further President Bush's goals of making cellulosic ethanol cost-competitive by 2012 and, along with increased automobile fuel efficiency, reducing America's gasoline consumption by 20 percent in ten

293

DOE Selects 13 Solar Energy Projects for up to $168 Million in Funding |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 Solar Energy Projects for up to $168 Million in 13 Solar Energy Projects for up to $168 Million in Funding DOE Selects 13 Solar Energy Projects for up to $168 Million in Funding March 8, 2007 - 10:28am Addthis First funding awards for Solar America Initiative to make solar technology cost-competitive by 2015 LOWELL, MA - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the selection of 13 industry-led solar technology development projects for negotiation for up to $168 million (FY'07-'09) in funding, subject to appropriation from Congress. These projects will help significantly reduce the cost of producing and distributing solar energy. As part of the cost-shared agreements, the industry-led teams will contribute more than 50 percent of the funding for these projects for a total value of up to $357 million over three years. These cooperative

294

DOE Selects Projects for up to $50 Million of Federal Funding to Modernize  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects for up to $50 Million of Federal Funding to Projects for up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid DOE Selects Projects for up to $50 Million of Federal Funding to Modernize the Nation's Electricity Grid April 21, 2008 - 10:49am Addthis Demonstration Projects Aim at 15 Percent Reduction of U.S. Peak Load Electricity Demand Washington, DC- U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin Kolevar today announced the Department's plans to invest up to $50 million over five years (Fiscal Years 2008 - 2012), subject to appropriations from Congress, in nine demonstration projects competitively selected to increase efficiency in the nation's electricity grid. The Renewable and Distributed Systems Integration (RDSI) technologies demonstrated in these projects aim to

295

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Three Projects to Help the Gulf Coast Recover and Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the secretary announced that DOE will donate 400,000 hours of supercomputing time at its National Energy Research Scientific Computing Center (NERSC) to the U.S. Army Corps of Engineers to assist with the rebuilding of levees. DOE is also offering hurricane-affected residents free rebuilding workshops providing expert advice on the latest

296

Microsoft Word - Oneida Waste to Energy Project DOE Final EA 1862  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ONEIDA SEVEN GENERATIONS ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office NOVEMBER 2011 DOE/EA-1862 FINAL ENVIRONMENTAL ASSESSMENT FOR THE ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office NOVEMBER 2011 DOE/EA-1862 DOE/EA-1862 iii November 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Environmental Assessment for Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin (DOE/EA-1862) CONTACT: For more information on this Environmental Assessment (EA), please contact:

297

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Three Projects to Help the Gulf Coast Recover and Announces Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the secretary announced that DOE will donate 400,000 hours of supercomputing time at its National Energy Research Scientific Computing Center (NERSC) to the U.S. Army Corps of Engineers to assist with the rebuilding of levees. DOE is also offering hurricane-affected residents free rebuilding workshops providing expert advice on the latest

298

DOE/EA-1649: Sabine Pass LNG Export Project Environmental Assessment (February 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sabine Sabine Pass LNG, L.P. Docket Nos. CP04-47-001 CP05-396-001 SABINE PASS LNG EXPORT PROJECT Environmental Assessment Cooperating Agency: U.S. Department of Energy DOE/EA - 1649 DOE Docket No. FE-08-77-LNG FEBRUARY 2009 20090223-4000 FERC PDF (Unofficial) 02/23/2009 ENVIRONMENTAL ASSESSMENT SABINE PASS LNG EXPORT PROJECT TABLE OF CONTENTS Page 1.0 PROPOSED ACTION ..................................................................................................................... 1 1.1 Introduction......................................................................................................................... 1 1.2 Proposed facilities............................................................................................................... 2 1.3 Project Purpose

299

United States Gulf Coast geopressured geothermal program. Special projects research and coordination assistance. Final report, 1 December 1978-30 October 1980  

SciTech Connect

Work for the period, December 1, 1978 through October 31, 1980, is documented. The following activities are covered: project technical coordination assistance and liaison; technical assistance for review and evaluation of proposals and contract results; technical assistance for geopressured-geothermal test wells; technical assistance, coordination, and planning of surface utilization program; legal research; and special projects. (MHR)

Dorfman, M.H.; Morton, R.A.

1981-06-01T23:59:59.000Z

300

RD&I meeting Review DOE Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 © SIGMA 3 Integrated Reservoir Solutions, Inc. All Rights Reserved. OUTLINE * Benefits to the program * Project Overview - Goals and Objectives - Purpose/POC - Stratagem * Technical Status - Reservoir Definition/model - Reservoir simulator - Challenges * Summary - Key Findings/Conclusion - Future Plans * Accomplishments * Appendix © SIGMA 3 Integrated Reservoir Solutions, Inc. All Rights Reserved. 3 © SIGMA 3 Integrated Reservoir Solutions, Inc. All Rights Reserved. BENEFITS TO THE PROGRAM * Simulation and Risk Assessment :Technologies that will support industries ability to predict CO 2 storage capacity in geologic formation to within ± 30% By: * Demonstrating field scale feasibility of using ED/RSM techniques to optimize engineering

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

York County Energy Partners DOE CCI ACFB demonstration project  

SciTech Connect

The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world`s largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy`s Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

Wang, S. [Air Products and Chemicals, Inc., Allentown, PA (United States); Cox, J.; Parham, D. [Foster Wheeler Energy Corp., Clinton, NJ (United States)

1992-09-01T23:59:59.000Z

302

York County Energy Partners DOE CCI ACFB demonstration project  

SciTech Connect

The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world's largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy's Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

Wang, S. (Air Products and Chemicals, Inc., Allentown, PA (United States)); Cox, J.; Parham, D. (Foster Wheeler Energy Corp., Clinton, NJ (United States))

1992-01-01T23:59:59.000Z

303

DOE Funded Research Projects Win 31 R D 100 Awards for 2007 October 18 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Funded DOE Funded Research Projects Win 31 R D 100 Awards for 2007 October 18 2007 News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.18.07 DOE Funded Research Projects Win 31 R D 100 Awards for 2007 October 18 2007 Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC. - Secretary of Energy Samuel W. Bodman today congratulated researchers at Department of Energy (DOE) laboratories and the DOE complex who have won 31 of the 100 2007 R&D 100 Awards given by R&D Magazine. The awards are presented annually in recognition of the most outstanding technology developments with commercial potential. R&D Magazine

304

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been completed in projects supported by the U.S. Department of Energy. If the potential of the sites is eventually fulfilled, they could safely and permanently store combined CO2 emissions equivalent to that produced by more than 11 million passenger vehicles annually or from the electricity use of more than 7 million homes for one year, according to Environmental

305

DOE to Invest up to $4.4 Million in Six Innovative Biofuels Projects at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4.4 Million in Six Innovative Biofuels 4.4 Million in Six Innovative Biofuels Projects at U.S. Universities DOE to Invest up to $4.4 Million in Six Innovative Biofuels Projects at U.S. Universities September 10, 2008 - 3:20pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of six advanced biofuels projects in which DOE plans to invest up to $4.4 million, subject to annual appropriations. These awards to U.S. institutions of higher education will support research and development (R&D) for cost-effective, environmentally friendly biomass conversion technologies for turning non-food feedstocks into advanced biofuels. Combined with the minimum university cost share of 20 percent, more than $5.7 million is slated for investment in these six projects. "Reaching out to our university partners across the country is one more

306

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations June 1, 2011 - 12:00am Addthis WASHINGTON, DC - As part of the Obama Administration's SunShot Initiative to make solar energy cost-competitive with fossil fuels within the decade, U.S. Department of Energy Secretary Steven Chu today announced the availability of more than $27 million in new funding that will reduce the non-hardware costs of solar energy projects, a critical element in bringing down the overall costs of installed solar energy systems. The funding will support a $12.5 million challenge to encourage cities and counties to compete to streamline and digitize permitting processes, as

307

DOE/EIS-0397: Lyle Falls Fish Passage Project Final Environmental Impact Statement (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Final Environmental Impact Statement DOE/EIS-0397 November 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BON N E V I L L E POW E R AD M I N I S T R A T I O N DOE/BP-3957 November 2008 Lyle Falls Fish Passage Facility Lyle Falls Fish Passage Project Final Environmental Impact Statement Bonneville Power Administration Confederated Tribes and Bands of the Yakama Nation Washington Department of Fish and Wildlife U.S.D.A. Forest Service November 2008 Lyle Falls Fish Passage Facility Lyle Falls Fish Passage Project Final Environmental Impact Statement (EIS) DOE/EIS-0397

308

Phase II Final Project Report Paso del Norte Watershed Council Coordinated Water Resources Database and GIS Project  

E-Print Network (OSTI)

of the Paso del Norte Watershed Council The Coordinated Water Resources Database Technical Committee with funding support provided by the El Paso Water Utilities http://www.pdnwatershed.org The work documented in this report was supported in part...

Brown, Christopher; Sheng, Zhuping; Bourdon, Marc

309

2008 Project Management Awards | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Awards » 2008 Project Management Awards Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Awards 2008 Project Management Awards Print Text Size: A A A RSS Feeds FeedbackShare Page Presented at the 2009 Department of Energy Project Management Workshop SECRETARY'S AWARD of ACHIEVEMENT: Office of Science, Large Hadron Collider (LHC) ATLAS and CMS Detector

310

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481  

SciTech Connect

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

Alleman, Glen B. [DOD Programs, Project Time and Cost (United States); Nosbisch, Michael R. [Managing Principle, Western Region, Project Time and Cost (United States)

2012-07-01T23:59:59.000Z

311

NETL: Methane Hydrates - DOE/NETL Projects - Verification Of Capillary  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification Of Capillary Pressure Functions And Relative Permeability Equations For Modeling Gas Production From Gas Hydrates Last Reviewed 12/12/2013 Verification Of Capillary Pressure Functions And Relative Permeability Equations For Modeling Gas Production From Gas Hydrates Last Reviewed 12/12/2013 DE-FE0009927 Goal The goal of this project is to verify and validate the capillary pressure functions and relative permeability equations that are frequently used in hydrate numerical simulators. In order to achieve this goal, numerical simulation using a network model will be used to suggest fitting parameters, modify existing equations or, if necessary, develop new equations for better simulation results. Performers Wayne State University, Detroit, MI 48202-3622 Background Numerical simulation is used to estimate and predict long-term behavior of hydrate-bearing sediments during gas production [Kurihara et al., 2008;

312

NETL: Methane Hydrates - DOE/NETL Projects - Measurement and Interpretation  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement and Interpretation of Seismic Velocities and Attenuation in Hydrate-Bearing Sediments Last Reviewed 12/18/2013 Measurement and Interpretation of Seismic Velocities and Attenuation in Hydrate-Bearing Sediments Last Reviewed 12/18/2013 DE-FE0009963 Goal The primary project objectives are to relate seismic and acoustic velocities and attenuations to hydrate saturation and texture. The information collected will be a unique dataset in that seismic attenuation will be acquired within the seismic frequency band. The raw data, when combined with other measurements (e.g., complex resistivity, micro-focus x-ray computed tomography, etc.), will enable researchers to understand not only the interaction between mineral surfaces and gas hydrates, but also how the hydrate formation method affects the hydrate-sediment system in terms of elastic properties. An over-arching goal of this research is to calibrate geophysical

313

NETL: Methane Hydrates - DOE/NETL Projects - Advanced Gas Hydrate  

NLE Websites -- All DOE Office Websites (Extended Search)

Comparative Assessment of Advanced Gas Hydrate Production Methods Last Reviewed 09/23/2009 Comparative Assessment of Advanced Gas Hydrate Production Methods Last Reviewed 09/23/2009 DE-FC26-06NT42666 Goal The goal of this project is to compare and contrast, through numerical simulation, conventional and innovative approaches for producing methane from gas hydrate-bearing geologic reservoirs. Numerical simulation is being used to assess the production of natural gas hydrates from geologic deposits using three production technologies: 1) depressurization, 2) direct CO2 exchange, and 3) dissociation-reformation CO2 exchange. Performers Battelle Pacific Northwest Division, Richland, Washington 99352 Background There are relatively few published studies of commercial production methods for gas hydrates, and all of these studies have examined essentially

314

NETL: Methane Hydrates - DOE/NETL Projects - Temporal Characterization of  

NLE Websites -- All DOE Office Websites (Extended Search)

Temporal Characterization of Hydrates System Dynamics Beneath Seafloor Mounds Integrating Time-Lapse Electrical Resistivity Methods and In Situ Observations of Multiple Oceanographic Parameters Last Reviewed 12/18/2013 Temporal Characterization of Hydrates System Dynamics Beneath Seafloor Mounds Integrating Time-Lapse Electrical Resistivity Methods and In Situ Observations of Multiple Oceanographic Parameters Last Reviewed 12/18/2013 DE-FE0010141 Goal The overall objective of the project is to investigate hydrate system dynamics beneath seafloor mounds—a structurally focused example of hydrate occurrence at the landward extreme of their stability field—in the northern Gulf of Mexico. Researchers will conduct observatory-based in situ measurements at Woolsey Mound, MC118 to: Characterize (geophysically) the sub-bottom distribution of hydrate and its temporal variability and, Contemporaneously record relevant environmental parameters (temperature, pressure, salinity, turbidity, bottom currents, and seafloor

315

NETL: Methane Hydrates - DOE/NETL Projects - Structural and Stratigraphic  

NLE Websites -- All DOE Office Websites (Extended Search)

Structural and Stratigraphic Controls on Methane Hydrate Occurrence and Distribution: Gulf of Mexico, Walker Ridge 313 and Green Canyon 955 Last Reviewed 12/24/2013 Structural and Stratigraphic Controls on Methane Hydrate Occurrence and Distribution: Gulf of Mexico, Walker Ridge 313 and Green Canyon 955 Last Reviewed 12/24/2013 DE-FE0009904 Goal The goal of this project is to determine structural and stratigraphic controls on hydrate occurrence and distribution in Green Canyon (GC) 955 and Walker Ridge (WR) 313 blocks with special emphasis on hydrate-bearing sand reservoirs. Structural and stratigraphic controls on hydrate distribution are examined by jointly analyzing surface-towed, multichannel seismic (MCS) and Ocean Bottom Seismometer (OBS) data and well logs through a combination of pre-stack depth migration (PSDM), traveltime and full-waveform inversion (FWI), and rock physics modeling methods. Performers Oklahoma State University, Stillwater, OK 74078-1026

316

DOE/EA-1155 Uranium Mill Tailing Remedial Action Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55 55 Uranium Mill Tailing Remedial Action Project Environmental Assessment of Ground- Water Compliance Activities At the Uranium Mill Tailings Site Spook, Wyoming February 1997 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office This page intentionally blank : illegible Portions of tbis DISCLAIMER document may be in electronic image products. Images are produced fiom the best available original dOClMXlf?IlL DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liabili- ty or responsibility for the accuracy, completeness,

317

DOE-Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources DOE-Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources March 31, 2009 - 1:00pm Addthis Washington, DC - A technology as simple as an advanced heater cable may hold the secret for tapping into the nation's largest source of oil, which is contained in vast amounts of shale in the American West. In a recently completed project sponsored by the U.S. Department of Energy (DOE) through the Office of Fossil Energy's Oil and Natural Gas Program, Composite Technology Development (CTD) Inc. successfully demonstrated the application of a ceramic-composite insulated heater cable for oil shale recovery deep underground. The Small Business Innovation Research project provided employment for 25 professionals and resulted in two patent

318

DOE and USDA Select Projects for more than $24 Million in Biomass Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and USDA Select Projects for more than $24 Million in Biomass and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants DOE and USDA Select Projects for more than $24 Million in Biomass Research and Development Grants November 12, 2009 - 12:00am Addthis Washington, DC - The U.S. Departments of Agriculture and Energy today announced projects selected for more than $24 million in grants to research and develop technologies to produce biofuels, bioenergy and high-value biobased products. Of the $24.4 million announced today, DOE plans to invest up to $4.9 million with USDA contributing up to $19.5 million. Advanced biofuels produced through this funding are expected to reduce greenhouse gas emissions by at least 50 percent compared to fossil fuels. "The selected projects will help make bioenergy production from renewable

319

DOE Selects Project for up to $7 Million of Federal Funding to Modernize  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Project for up to $7 Million of Federal Funding to Selects Project for up to $7 Million of Federal Funding to Modernize Hawaii's Energy Infrastructure DOE Selects Project for up to $7 Million of Federal Funding to Modernize Hawaii's Energy Infrastructure April 21, 2008 - 1:46pm Addthis University of Hawaii Team to Install Distribution Management System at Maui Substation Honolulu, Hawaii- U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability (OE) Kevin Kolevar announced the Department's plans to invest up to $7 million over three years in a demonstration project led by the University of Hawaii's Natural Energy Institute to increase efficiency in the State's energy infrastructure. Assistant Secretary Kolevar was joined by Governor Linda Lingle in making the announcement today in Honolulu. The project, totaling $15 million, is

320

DOE Announces $30 Million for Plug-in Hybrid Electric Vehicle Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Million for Plug-in Hybrid Electric Vehicle 0 Million for Plug-in Hybrid Electric Vehicle Projects DOE Announces $30 Million for Plug-in Hybrid Electric Vehicle Projects June 12, 2008 - 1:30pm Addthis Adds Plug-in Hybrid Vehicle to Department's Fleet WASHINGTON - U.S. Department of Energy (DOE) Assistant Secretary of Energy Efficiency and Renewable Energy Andy Karsner today announced up to $30 million in funding over three years for three cost-shared Plug-in Hybrid Electric Vehicles (PHEVs) demonstration and development projects. The selected projects will accelerate the development of PHEVs capable of traveling up to 40 miles without recharging, which includes most daily roundtrip commutes and satisfies 70 percent of the average daily travel in the U. S. The projects will also address critical barriers to achieving

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

322

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

323

DOE Selects Project for up to $7 Million of Federal Funding to Modernize  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Project for up to $7 Million of Federal Funding to Selects Project for up to $7 Million of Federal Funding to Modernize Hawaii's Energy Infrastructure DOE Selects Project for up to $7 Million of Federal Funding to Modernize Hawaii's Energy Infrastructure April 21, 2008 - 1:46pm Addthis University of Hawaii Team to Install Distribution Management System at Maui Substation Honolulu, Hawaii- U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability (OE) Kevin Kolevar announced the Department's plans to invest up to $7 million over three years in a demonstration project led by the University of Hawaii's Natural Energy Institute to increase efficiency in the State's energy infrastructure. Assistant Secretary Kolevar was joined by Governor Linda Lingle in making the announcement today in Honolulu. The project, totaling $15 million, is

324

CT10 NLO and NNLO Parton Distribution Functions from the Coordinated Theoretical-Experimental Project on QCD  

DOE Data Explorer (OSTI)

The Coordinated Theoretical-Experimental Project on QCD is a multi-institutional collaboration devoted to a broad program of research projects and cooperative enterprises in high-energy physics centered on Quantum Chromodynamics (QCD) and its implications in all areas of the Standard Model and beyond. The Collaboration consists of theorists and experimentalists at 18 universities and 5 national laboratories. More than 65 sets of Parton Distribution Functions are available for public access. Links to many online software tools, information about Parton Distribution Functions, papers, and other resources are also available.

Huston, Joey (Co-Spokesperson); Ownes, Joseph (Co-Spokesperson)

325

The DOE Wide Area Measurement System (WAMS) Project: Demonstration of dynamic information technology for the future power system  

SciTech Connect

In 1989 the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands, in an environment where increased competition, a wider range of services and vendors, and much narrower operating margins all contribute to increased system efficiencies and capacity. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment--the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI). The WAMS project also brings added focus and resources to the evolving Western System Dynamic Information Network, or WesDINet. This is a collective response of the Western Systems Coordinating Council (WSCC) member utilities to their shared needs for direct information about power system characteristics, model fidelity, and operational performance. The WAMS project is a key source of the technology and backbone communications needed to make WesDINet a well integrated, cost effective enterprise network demonstrating the role of dynamic information technology in the emerging utility environment.

Mittelstadt, W.A. [USDOE Bonneville Power Administration, Portland, OR (United States); Krause, P.E.; Wilson, R.E. [USDOE Western Area Power Administration, Golden, CO (United States); Overholt, P.N. [USDOE, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

1996-07-01T23:59:59.000Z

326

DOE/EIS-03321: Condon Wind Project Draft Environmental Impact Statement (05/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Draft Environmental Impact Statement DOE/EIS-0321 CONDON WIND PROJECT Condon Wind Project Draft Environmental Impact Statement (DOE/EIS-0321) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Condon Wind Project States Involved: Oregon Abstract: BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource

327

NETL: News Release - DOE Selects Eight National Lab Projects as Research to  

NLE Websites -- All DOE Office Websites (Extended Search)

February 18, 2000 February 18, 2000 DOE Selects Eight National Lab Projects as Research to Capture, Store Greenhouse Gases Expands The U.S. Department of Energy (DOE) will tap the talents of eight of its national laboratories as it expands its research into future ways to capture and store greenhouse gases. MORE INFO Carbon Sequestration Program. In the first of two major project selections the department expects to make this year in its carbon sequestration program, DOE said it will provide $7.7 million to the laboratories over the next three years to study innovations ranging from carbon dioxide filtering membranes to the development of "biofilms" made up of carbon-converting microorganisms. In seven of the eight projects, lab researchers will team with scientists

328

DOE Selects Projects to Monitor and Evaluate Geologic CO2 Storage |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monitor and Evaluate Geologic CO2 Storage Monitor and Evaluate Geologic CO2 Storage DOE Selects Projects to Monitor and Evaluate Geologic CO2 Storage August 24, 2009 - 1:00pm Addthis Washington, D.C. -- The U.S. Department of Energy (DOE) today announced the selection of 19 projects to enhance the capability to simulate, track, and evaluate the potential risks of carbon dioxide (CO2) storage in geologic formations. The projects' total value is approximately $35.8 million over four years, with $27.6 million of DOE funding and $8.2 million of non-Federal cost sharing. The work will be managed by the Office of Fossil Energy's National Energy Technology Laboratory. Coal is the Nation's most abundant energy resource, supplying nearly 50 percent of domestic electricity. In order for low-cost electricity from

329

USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop Production and Spur Economic Impact USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop Production and Spur Economic Impact August 11, 2011 - 3:55pm Addthis WASHINGTON, DC -- The U.S. Departments of Energy and Agriculture have awarded 10 grants totaling $12.2 million to spur research into improving the efficiency and cost-effectiveness of growing biofuel and bioenergy crops. The investments are part of a broader effort by the Obama administration to develop domestic renewable energy and advanced biofuels, providing a more secure future for America's energy needs and creating new opportunities for the American farming industry. "Biofuels, along with other advanced vehicle technologies, hold the

330

DOE Selects Projects to Advance Technologies for the Co-Production of Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Technologies for the Co-Production Advance Technologies for the Co-Production of Power and Hydrogen, Fuels or Chemicals from Coal-Biomass Feedstocks DOE Selects Projects to Advance Technologies for the Co-Production of Power and Hydrogen, Fuels or Chemicals from Coal-Biomass Feedstocks August 18, 2010 - 1:00pm Addthis Washington, DC - Eight projects that will focus on gasification of coal/biomass to produce synthetic gas (syngas) have been selected for further development by the U.S. Department of Energy (DOE). The total value of the projects is approximately $8.2 million, with $6.4 million of DOE funding and $1.8 million of non-Federal cost sharing. Syngas is a mixture of predominantly carbon monoxide and hydrogen which can subsequently be converted either to power, fuels, or chemicals. The

331

USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop Production and Spur Economic Impact USDA and DOE Fund 10 Research Projects to Accelerate Bioenergy Crop Production and Spur Economic Impact August 11, 2011 - 3:55pm Addthis WASHINGTON, DC -- The U.S. Departments of Energy and Agriculture have awarded 10 grants totaling $12.2 million to spur research into improving the efficiency and cost-effectiveness of growing biofuel and bioenergy crops. The investments are part of a broader effort by the Obama administration to develop domestic renewable energy and advanced biofuels, providing a more secure future for America's energy needs and creating new opportunities for the American farming industry. "Biofuels, along with other advanced vehicle technologies, hold the

332

DOE/AHAM advanced refrigerator technology development project  

SciTech Connect

As part of the effort to improve residential energy efficiency and reduce greenhouse emissions from power plants, several design options were investigated for improving the energy efficiency of a conventionally designed domestic refrigerator-freezer. The program goal was to reduce the energy consumption of a 20-ft{sup 3} (570-L) top-mount refrigerator-freeze to 1.00 kWh/d, a 50% reduction from the 1993 National Appliance Energy Conservation Act (NAECA) standard. The options--such as improved cabinet and door insulation, a high-efficiency compressor, a low-wattage fan, a large counterflow evaporator, and adaptive defrost control--were incorporated into prototype refrigerator-freezer cabinets and refrigeration systems. The refrigerant HFC-134a was used as a replacement for CFC-12. The baseline energy performance of the production refrigerator-freezers, along with cabinet heat load and compressor calorimeter test results, were extensively documented to provide a firm basis for experimentally measured energy savings. The project consisted of three main phases: (1) an evaluation of energy-efficient design options using computer simulation models and experimental testing, (2) design and testing of an initial prototype unit, and (3) energy and economic analyses of a final prototype. The final prototype achieved an energy consumption level of 0.93 kWh/d--an improvement of 45% over the baseline unit and 54% over the 1993 NAECA standard for 20-fg{sup 3} (570-L) units. The manufacturer`s cost for those improvements was estimated at $134; assuming that cost is doubled for the consumer, it would take about 11.4 years to pay for the design changes. Since the payback period was thought to be unfeasible, a second, more cost-effective design was also tested. Its energy consumption level was 1.16 kWh/d, a 42% energy savings, at a manufacturer`s cost increase of $53. Again assuming a 100% markup, the payback for this unit would be 6.6 years.

Vineyard, E.A.; Sand, J.R.; Rice, C.K.; Linkous, R.L.; Hardin, C.V.; Bohman, R.H.

1997-03-01T23:59:59.000Z

333

NETL: Methane Hydrates - DOE/NETL Projects - Natural Gas Hydrates in  

NLE Websites -- All DOE Office Websites (Extended Search)

The National Methane Hydrates R&D Program The National Methane Hydrates R&D Program DOE/NETL Methane Hydrate Projects Natural Gas Hydrates in Permafrost and Marine Settings: Resources, Properties, and Environmental Issues Last Reviewed 12/30/2013 DE-FE0002911 Goal The objective of this DOE-USGS Interagency Agreement is to provide world-class expertise and research in support of the goals of the 2005 Energy Act for National Methane Hydrates R&D, the DOE-led U.S. interagency roadmap for gas hydrates research, and elements of the USGS mission related to energy resources, global climate, and geohazards. This project extends USGS support to the DOE Methane Hydrate R&D Program previously conducted under DE-AI26-05NT42496. Performer U.S. Geological Survey at Woods Hole, MA, Denver, CO, and Menlo Park, CA

334

California Hydrogen Infrastructure Project - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Edward C. Heydorn Air Products and Chemicals, Inc. 7201 Hamilton Boulevard Allentown, PA 18195 Phone: (610) 481-7099 Email: heydorec@airproducts.com DOE Managers HQ: Jason Marcinkoski Phone: (202) 586-7466 Email: Jason.Marcinkoski@ee.doe.gov GO: Jim Alkire Phone: (720) 356-1426 Email: James.Alkire@go.doe.gov Contract Number: DE-FC36-05GO85026 Working Partners/Subcontractors: * University of California Irvine (UCI), Irvine, CA * National Fuel Cell Research Center (NFCRC), Irvine, CA Project Start Date: August 1, 2005 Project End Date: December 31, 2011 Fiscal Year (FY) 2012 Objectives Demonstrate a cost-effective infrastructure model in

335

NETL: News Release -DOE Selects Projects Totaling $12.4 Million Aimed at  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 1, 2011 DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection Focus is on Shale Gas, Enhanced Oil Recovery Washington, D.C. - A total of 11 research projects that will help find ways to extract more energy from unconventional oil and gas resources while reducing environmental risks have been selected totaling $12.4 million by the U.S. Department of Energy's (DOE) Office of Fossil Energy (FE). MORE INFO Link to RPSEA website The selections include $10.3 million for eight projects that will reduce the environmental risks of shale gas development while accelerating the application of new exploration and production technologies; and $2.1 million for three projects investigating innovative processes for

336

DOE Announces Clean Energy Projects for Low-Carbon Communities of the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Projects for Low-Carbon Communities of Clean Energy Projects for Low-Carbon Communities of the Americas Initiative DOE Announces Clean Energy Projects for Low-Carbon Communities of the Americas Initiative January 8, 2010 - 12:00am Addthis WASHINGTON, D.C. - In support of the Energy and Climate Partnership of the Americas announced by President Obama at the 2009 Summit of the Americas, Secretary Steven Chu announced today that the U.S. Department of Energy has selected three initial projects under the Low-Carbon Communities of the Americas (LCCA) - a program launched in June 2009 to assist countries in Latin America with sustainable energy market transformation initiatives. "DOE is committed to advancing clean energy technology development and deployment globally," said Secretary Chu. "The Low-Carbon Communities of

337

NETL: News Release - DOE Funds Projects Geared Toward Near-Zero Emissions  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2006 27, 2006 DOE Funds Projects Geared Toward Near-Zero Emissions Power Production WASHINGTON, DC - The Department of Energy today announced the selection of five projects totaling nearly $12 million targeting cost-effective technologies to improve the performance and economics of near-zero emission, coal-based power generation systems. Developed for the Office of Fossil Energy's Advanced Research program, the projects focus on identifying technologies that address physical, chemical, biological and thermodynamic constraints in the cross cutting technology areas of instrumentation, sensors and control systems, materials, and computational energy sciences. DOE is providing more than $9.3 million in funding while industry is contributing more than $2.3 million. The projects range from 24 to 36 months in duration.

338

DOE extends the Idaho Cleanup Project Contract for Three Years | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

extends the Idaho Cleanup Project Contract for Three Years extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract ends September 30, 2012. DOE extended their contract through September 30, 2015, and the anticipated dollar value of this extension is $730 million. This extension will help ensure that the government receives the highest return on investment for its environmental restoration work. Since 2005,

339

DOE/EIS-0395; San Luis Rio Colorado Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

note: Missing pages contain figures which can be found in the "Figures" folder note: Missing pages contain figures which can be found in the "Figures" folder on the San Luis Rio Colorado Project Draft Environmental Impact Statement compact disc (CD). Some of the figures were removed from this file to decrease file size for ease of downloading and/or viewing. San Luis Rio Colorado Project Draft EIS I S SUMMARY The U.S. Department of Energy (DOE) received applications from North Branch Resources, LLC (NBR) and Generadora del Desierto S.A. de C.V. (GDD) for the proposed San Luis Rio Colorado Project (Proposed Project). GDD and NBR (collectively termed the Applicants) are each wholly owned subsidiaries of North Branch Holding, LLC. GDD applied to the Office of Electricity Delivery and Energy Reliability (OE), an organizational unit within DOE, for a

340

UMore Park Wind Turbine Project Loggerhead Shrike Survey, DOE/EA-1791 (June  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UMore Park Wind Turbine Project Loggerhead Shrike Survey, UMore Park Wind Turbine Project Loggerhead Shrike Survey, DOE/EA-1791 (June 2010) UMore Park Wind Turbine Project Loggerhead Shrike Survey, DOE/EA-1791 (June 2010) The project area is located in a region of the state where Loggerhead Shrikes (Lanius ludovicianus) are consistently observed and known to be nesting. With populations steadily declining throughout its breeding range, the Loggerhead Shrike is officially listed as a state Threatened species in Minnesota; its status may be upgraded to Endangered during the current list review process. The shrike is also considered a Species of Special Concern in Minnesota and is a U.S. Fish and Wildlife Species of Regional Concern in the Midwest Region. Dakota County is believed to harbor the densest concentration of shrikes in Minnesota. As recently as 2009 a breeding pair

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

DOE Awards Cooperative Agreement for Post-Combustion Carbon Capture Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awards Cooperative Agreement for Post-Combustion Carbon Capture Awards Cooperative Agreement for Post-Combustion Carbon Capture Project DOE Awards Cooperative Agreement for Post-Combustion Carbon Capture Project March 12, 2010 - 12:00pm Addthis Washington, D.C. -- The U.S. Department of Energy has awarded a cooperative agreement to American Electric Power Service Corporation (AEP) for the Mountaineer Commercial Scale Carbon Capture and Storage (CCS) Project to design, construct, and operate a system that will capture and store approximately 1.5 million tons per year of carbon dioxide (CO2). The project was a third round selection under DOE's Clean Coal Power Initiative, a cost-shared collaboration between the federal government and private industry aimed at stimulating investment in low-emission coal-based power generation technology through successful commercial demonstrations.

342

DOE extends the Idaho Cleanup Project Contract for Three Years | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

extends the Idaho Cleanup Project Contract for Three Years extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract ends September 30, 2012. DOE extended their contract through September 30, 2015, and the anticipated dollar value of this extension is $730 million. This extension will help ensure that the government receives the highest return on investment for its environmental restoration work. Since 2005,

343

DOE Selects Projects Aimed at Reducing Drilling Risks in Ultra-Deepwater |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Projects Aimed at Reducing Drilling Risks in Selects Projects Aimed at Reducing Drilling Risks in Ultra-Deepwater DOE Selects Projects Aimed at Reducing Drilling Risks in Ultra-Deepwater November 22, 2011 - 12:00pm Addthis Washington, DC - The U.S. Department of Energy's Office of Fossil Energy (FE) has selected six new natural gas and oil research projects aimed at reducing risks and enhancing the environmental performance of drilling in ultra-deepwater settings. The projects have been selected for negotiation leading to awards totaling $9.6 million, and will add to the research portfolio for FE's Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program. Research needs addressed by the projects include the prevention of uncontrolled oil flow through new and better ways to cement well casing,

344

DOE Selects Projects to Develop Sensors and Controls for Next-Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Projects to Develop Sensors and Controls for Selects Projects to Develop Sensors and Controls for Next-Generation Power Plants DOE Selects Projects to Develop Sensors and Controls for Next-Generation Power Plants August 25, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has selected seven projects to develop sensors and controls to support the full-scale implementation and operation of highly efficient power generation technologies with near-zero emissions. The total award value of the projects is nearly $7 million, which includes $1.4 million in cost-sharing from the recipients. The projects will be managed by the Office of Fossil Energy's National Energy Technology Laboratory. Future power generation facilities are expected to be very complex, requiring a high level of system integration for efficient operation. To

345

NETL: News Release - DOE Selects New Projects to Enhance Oil and Gas  

NLE Websites -- All DOE Office Websites (Extended Search)

December 8, 2004 December 8, 2004 DOE Selects New Projects to Enhance Oil and Gas Production 35 Projects Contribute to Energy Security, Reduce Greenhouse Gas Emissions WASHINGTON, DC - Secretary of Energy Spencer Abraham today announced the selection of 35 new cost-shared projects that promise to strengthen our nation's energy security and reduce greenhouse emissions. In announcing the awards, Secretary Abraham lauded the wide-ranging projects as "an investment in our future that will benefit the Nation for years to come." The total award value of the new projects is more than $39 million. "President Bush's National Energy Policy calls attention to the continuing need to strengthen our energy security, modernize energy infrastructure, and accelerate the protection and improvement of the environment," Secretary Abraham said. "It also calls for promoting enhanced oil and gas recovery, and improving oil- and gas-exploration technology to increase domestic energy supplies. The new projects meet all of these important national goals."

346

DOE Research Projects to Examine Promising Geologic Formations for CO2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Projects to Examine Promising Geologic Formations for Research Projects to Examine Promising Geologic Formations for CO2 Storage DOE Research Projects to Examine Promising Geologic Formations for CO2 Storage September 16, 2009 - 1:00pm Addthis Washington, DC - The Department of Energy today announced 11 projects valued at $75.5 million aimed at increasing scientific understanding about the potential of promising geologic formations to safely and permanently store carbon dioxide (CO2). View Project Details Funding for the projects includes $49.75 million from the 2009 American Reinvestment and Recovery Act and will result in substantial employment opportunities for local and regional organizations over the next three years while providing hands-on scientific experience for individuals looking to be employed in the carbon capture and storage (CCS) industry.

347

DOE/EA-1650: Freeport LNG Export Project and BOG/Truck Project Environmental Assessment (May 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Freeport LNG Development, L.P. Freeport LNG Development, L.P. Docket Nos. CP03-75-003, CP03-75-004, CP05-361-001, and CP05-361-002 FREEPORT LNG EXPORT PROJECT and BOG/TRUCK PROJECT Environmental Assessment Cooperating Agency: U.S. Department of Energy DOE/EA - 1650 DOE Docket No. FE-08-70-LNG MARCH 2009 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 OFFICE OF ENERGY PROJECTS In Reply Refer To: OEP/DG2E/Gas 2 Freeport LNG Development, L.P. Docket Nos. CP03-75-003, CP03-75-004 CP05-361-001 and CP05-361-002 §375.308(x) TO THE PARTY ADDRESSED: The staff of the Federal Energy Regulatory Commission (FERC or Commission) and the Department of Energy (DOE), Office of Fossil Fuels, have prepared an environmental assessment (EA) on the liquefied natural gas (LNG) facilities proposed by

348

USDA, DOE to Invest up to $18.4 million for Biomass Research, Development and Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE))

"USDA and DOE will invest up to $18.4 million, over three years, for 21 biomass research and development (R&D), and demonstration projects"

349

DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-1999/AppxA.HTML[6/24/2011 1:16:37 PM] 2-1999/AppxA.HTML[6/24/2011 1:16:37 PM] APPENDIX A CONSULTATION LETTERS This appendix will include consultation/approval letters between the U.S. Department of Energy (DOE) and the U.S. Fish and Wildlife Service regarding threatened and endangered species, and between other State and Federal agencies as needed. Letters currently supplied are from the U.S. Fish and Wildlife Service to DOE. DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999) file:///I|/Data%20Migration%20Task/EIS-0290-FEIS-02-1999/AppxA.HTML[6/24/2011 1:16:37 PM] DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999) file:///I|/Data%20Migration%20Task/EIS-0290-FEIS-02-1999/AppxA.HTML[6/24/2011 1:16:37 PM] DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999)

350

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

White, T.; Contos, L.

1991-09-01T23:59:59.000Z

351

DOE to Host Three Alaska Native Village Renewable Energy Project Development Workshops in March  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) Office of Indian Energy is offering a series of regional interactive workshops designed to provide Alaska Native leaders and their staffs with the information and guidance needed to navigate the complexities of developing and implementing energy projects.

352

DOE National Laboratory Research Projects Win 31 R&D 100 Awards for 2007 |  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE National DOE National Laboratory Research Projects Win 31 R&D 100 Awards for 2007 News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.19.07 DOE National Laboratory Research Projects Win 31 R&D 100 Awards for 2007 Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC - The U.S. Department of Energy's Under Secretary for Science Raymond L. Orbach today lauded researchers from ten of the Department of Energy's world-class national laboratories that last night were awarded 31 of the world's top 100 scientific and technological innovations in 2007, as judged by R&D Magazine. The awards are presented

353

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

1992-03-01T23:59:59.000Z

354

The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260  

SciTech Connect

The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States)] [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States)] [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)] [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

2013-07-01T23:59:59.000Z

355

DOE Selects Biofuels Projects to Receive up to $21 Million in Funding |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Biofuels Projects to Receive up to $21 Million in Selects Biofuels Projects to Receive up to $21 Million in Funding DOE Selects Biofuels Projects to Receive up to $21 Million in Funding August 31, 2009 - 12:00am Addthis WASHINGTON, DC- U.S. Department of Energy Secretary Steven Chu announced today that up to $21 million will be made available for the selection of five projects that will develop supply systems to handle and deliver high tonnage biomass feedstocks for cellulosic biofuels production. The awards announced today are part of the department's ongoing efforts to reduce U.S. dependence on foreign oil, spur the creation of the domestic bio-industry and provide new jobs in many rural areas of the country. "Biofuels will play an important role in America's clean energy portfolio," Secretary Chu said. "These projects will allow us to decrease our

356

NETL: News Release - DOE Selects 5 New Projects to Bolster Nation's Future  

NLE Websites -- All DOE Office Websites (Extended Search)

September 5, 2000 September 5, 2000 DOE Selects 5 New Projects to Bolster Nation's Future Natural Gas Supplies With "deeper and denser" likely to become the axiom for tomorrow's natural gas producers, the Department of Energy is adding five new projects to its natural gas research program. For three of the projects, the target is natural gas buried under extremely hard rock formations, trapped in gas hydrates on the ocean floor, and in remote regions of the Arctic. The other two explore ways to keep low-volume "stripper" gas wells flowing and to boost the amount of "working gas" stored in salt caverns. The projects are the latest to be selected from a broad-ranging competition conducted for the Energy Department's Office of Fossil Energy by the National Energy Technology Laboratory. The five projects have a total value approaching $7 million, $4.7 million of which will be the federal government's share.

357

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

358

DOE Announces 1st Projects to Meet President's Clean Coal Commitment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1st Projects to Meet President's Clean Coal 1st Projects to Meet President's Clean Coal Commitment DOE Announces 1st Projects to Meet President's Clean Coal Commitment January 15, 2003 - 8:58am Addthis Washington, DC - Secretary of Energy Spencer Abraham today announced the first eight projects chosen by the Department of Energy in the initial phase of President Bush's Clean Coal Power Initiative. The projects, valued at more than $1.3 billion, are expected to help pioneer a new generation of innovative power plant technologies that could help meet the President's Clear Skies and Climate Change initiatives. "The level of interest expressed in the first competition was tremendous," Secretary Abraham said. "That is a clear indication of the potential to develop and apply technology to improve our energy security through the use

359

DOE Project Leads to New Alliance to Promote Low-Impact Drilling |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Leads to New Alliance to Promote Low-Impact Drilling Project Leads to New Alliance to Promote Low-Impact Drilling DOE Project Leads to New Alliance to Promote Low-Impact Drilling February 25, 2009 - 12:00pm Addthis Washington, DC -- A project supported by the Office of Fossil Energy's National Energy Technology Laboratory (NETL) has given rise to a major new research consortium to promote advanced technology for low-impact oil and gas drilling. Announced earlier this month by the Houston Advanced Research Center (HARC) and Texas A&M University, the University/National Laboratory Alliance will fund and transfer advanced technologies to accelerate development of domestic oil and natural gas resources with minimal environmental impact. The alliance has its roots in a project funded through the Office of Fossil

360

DOE Funds 21 Research, Development and Demonstration Projects for up to $78  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funds 21 Research, Development and Demonstration Projects for Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems October 6, 2008 - 4:14pm Addthis RENO, Nev. - Today at the National Geothermal Conference in Reno, Nev., Deputy Assistant Secretary for Renewable Energy Steve Chalk announced the U.S. Department of Energy's (DOE) awards under a Funding Opportunity Announcement (FOA) for research, development and demonstration of Enhanced Geothermal Systems (EGS) for next-generation geothermal energy technologies. Subject to annual appropriations, the Department will provide up to $43.1 million over four years to 21 awardees, including a

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE/EIS-0294; Sutter Power Project Final Environmental Impact Statement, Volume I (April 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sutter Power Project Final EIS Sutter Power Project Final EIS April, 1999 1 - 3 CHAPTER 1 INTRODUCTION TO THE FINAL ENVIRONMENTAL IMPACT STATEMENT 1.1 INTRODUCTION Western Area Power Administration (Western) is a power marketing administration of the U.S. Department of Energy (DOE). Western owns and operates a grid of electrical transmission lines in 15 western states, including California. The Calpine Corporation (Calpine) has requested an interconnection to Western's Keswick- Elverta/Olinda-Elverta double-circuit 230-kV transmission line to transmit electricity generated by their proposed Sutter Power Project (SPP). The SPP is a proposed 500- megawatt (MW) natural gas-fueled, combined-cycle, electric generation facility. This Final Environmental Impact Statement (EIS) can be viewed on DOE's National

362

DOE Funded Research Projects Win 30 R&D Awards for 2008 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funded Research Projects Win 30 R&D Awards for 2008 Funded Research Projects Win 30 R&D Awards for 2008 DOE Funded Research Projects Win 30 R&D Awards for 2008 June 22, 2008 - 2:15pm Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman announced today that researchers from the U.S. Department of Energy's (DOE) National Laboratories and Y-12 National Security Complex have won 30 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted awards are presented annually in recognition of exceptional new products, processes, materials or software developed throughout the world and introduced into the market the previous year. "I'm very proud that Department of Energy scientists and engineers captured

363

DOE National Laboratory Research Projects Win 31 R&D Awards for 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory Research Projects Win 31 R&D Awards for Laboratory Research Projects Win 31 R&D Awards for 2007 DOE National Laboratory Research Projects Win 31 R&D Awards for 2007 October 19, 2007 - 3:21pm Addthis WASHINGTON, DC - The U.S. Department of Energy's Under Secretary for Science Raymond L. Orbach today lauded researchers from ten of the Department of Energy's world-class national laboratories that last night were awarded 31 of the world's top 100 scientific and technological innovations in 2007, as judged by R&D Magazine. The awards are presented annually in recognition of the most outstanding technology developments with commercial potential. 18 of the awards won by DOE lab researchers were shared with researchers from universities and businesses. R&D Magazine presented the awards last night at its 45th Annual R&D Awards

364

DOE Selects Projects to Develop Pre-Combustion Carbon Capture Technologies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Develop Pre-Combustion Carbon Capture Develop Pre-Combustion Carbon Capture Technologies for Coal-Based Gasification Plants DOE Selects Projects to Develop Pre-Combustion Carbon Capture Technologies for Coal-Based Gasification Plants June 11, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) today announced the selection of nine projects that will develop pre-combustion carbon capture technologies that can reduce CO2 emissions in future coal-based integrated gasification combined cycle (IGCC) power plants. The projects, totaling nearly $14.4 million, will be managed by the Office of Fossil Energy's National Energy Technology Laboratory. Pre-combustion processes convert fossil fuels into a gaseous mixture of hydrogen and CO2 prior to combustion. The CO2 is then separated and the

365

DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Totaling $12.4 Million Aimed at Increasing Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection DOE Selects Projects Totaling $12.4 Million Aimed at Increasing Domestic Energy Production While Enhancing Environmental Protection August 1, 2011 - 1:00pm Addthis Washington, DC - A total of 11 research projects that will help find ways to extract more energy from unconventional oil and gas resources while reducing environmental risks have been selected totaling $12.4 million by the U.S. Department of Energy's (DOE) Office of Fossil Energy (FE). The selections include $10.3 million for eight projects that will reduce the environmental risks of shale gas development while accelerating the application of new exploration and production technologies; and $2.1

366

NETL: News Release - DOE-Funded Project Shows Promise for Tapping Vast U.S.  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2009 March 31, 2009 DOE-Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources Colorado Company Seeks Patents on Low-Cost, Low-Impact Heater Technology Washington, DC -A technology as simple as an advanced heater cable may hold the secret for tapping into the nation's largest source of oil, which is contained in vast amounts of shale in the American West. In a recently completed project sponsored by the U.S. Department of Energy (DOE) through the Office of Fossil Energy's Oil and Natural Gas Program, Composite Technology Development (CTD) Inc. successfully demonstrated the application of a ceramic-composite insulated heater cable for oil shale recovery deep underground. The Small Business Innovation Research project provided employment for 25 professionals and resulted in two patent applications related to the cable.

367

DOE Funded Research Projects Win 30 R&D Awards for 2008 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funded Research Projects Win 30 R&D Awards for 2008 Funded Research Projects Win 30 R&D Awards for 2008 DOE Funded Research Projects Win 30 R&D Awards for 2008 June 22, 2008 - 2:15pm Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman announced today that researchers from the U.S. Department of Energy's (DOE) National Laboratories and Y-12 National Security Complex have won 30 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted awards are presented annually in recognition of exceptional new products, processes, materials or software developed throughout the world and introduced into the market the previous year. "I'm very proud that Department of Energy scientists and engineers captured

368

DOE Selects Nine New University Coal Research Projects to Advance Coal-Based Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Nine New University Coal Research Projects to Advance Coal-Based Power Selects Nine New University Coal Research Projects to Advance Coal-Based Power Systems Nine new projects selected by the U.S. Department of Energy (DOE) under the University Coal Research program will seek long-term solutions for the clean and efficient use of our nation's abundant coal resources. The announcement today of the selections marks the 34 th round of the Department's longest-running coal program, which began in 1979. This research continues DOE efforts to improve the understanding of the chemical and physical processes governing coal conversion and utilization, and support the technological development of the advanced coal power systems of the future. These advanced systems include ultra-clean

369

DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-1999/cover.HTML[6/24/2011 1:11:59 PM] 1-1999/cover.HTML[6/24/2011 1:11:59 PM] COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement (EIS) (DOE/EIS- 0290) Location: Idaho National Engineering and Environmental Laboratory (INEEL) Contacts: For further information on this environmental impact statement (EIS), call: 1-800-708-2680 or contact: Mr. John E. Medema AMWTP EIS Document Manager DOE Idaho Operations Office 850 Energy Drive, MS 1117 Idaho Falls, ID 83403 (208) 526-1407 For further information on the DOE National Environmental Policy Act (NEPA) process, leave a message at: 1-800-472-2756 or contact: Ms. Carol Borgstrom Director Office of NEPA Policy and Assistance (EH-42) Office of Environment, Safety and Health

370

DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent  

Office of Legacy Management (LM)

Ru\-- 7-2-4@ Ru\-- 7-2-4@ DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent Pond Site Long-Term Groundwater Monitoring Plan July 1996 Environmental Restoration U.S. Department of Energy This report has been reproduced from the best available copy. Available in paper copy and microfiche. Number of pages in this report: 5 1 DOE and DOE contractors cari obtain copies of this report from: Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 3783 1. (61 5) 576-8401. This report is publicly available from the Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22 16 1. (703) 487-4650. RULISON DRILLING EFFLUENT POND SITE LONG-TERM GROUNDWATER MONITORING PLAN DOE Nevada Operations Office

371

NETL: News Release - DOE Selects 2 Projects to Expand Natural Gas  

NLE Websites -- All DOE Office Websites (Extended Search)

October 2, 2000 October 2, 2000 DOE Selects 2 Projects to Expand Natural Gas Development and Use A technology that converts natural gas into liquids and a process that upgrades raw, low-quality natural gas to pipeline quality are the focus of two projects selected by the Department of Energy in a nationwide competition. The projects are valued at approximately $3.2 million, with DOE contributing a little more than $2 million. The Energy Department's National Energy Technology Laboratory, the lead laboratory for fossil energy research and development, will manage the two projects: Praxair of Tarrytown, NY and subcontractor Foster Wheeler Development Corporation, will develop a novel system that processes natural gas into "synthesis gas" - gas that can be chemically recombined into a variety of liquid fuels -- in less time than conventional methods. Featuring a short reaction-time catalyst used with the company's gas-mixing technology, the system requires significantly less energy then conventional synthesis gas manufacturing plants. It also is less costly to build and does not use steam, another cost-saving feature. It could be a major contributor in future technologies to convert remote or otherwise stranded gas supplies into liquid fuels that could be more easily transported to market. Significant quantities of stranded gas are found in Alaska, for example.

372

Review and Selection of Research Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Review and Selection of Research Projects Review and Selection of Research Projects High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search Peer Merit / Review Policies Early Career Research Opportunities in High Energy Physics Graduate Fellows in High Energy Theory Guidelines Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Peer Merit / Review Policies Review and Selection of Research Projects Print Text Size: A A A RSS Feeds FeedbackShare Page All research projects supported by the Office of High Energy Physics (HEP)

373

DOE - Office of Legacy Management -- Dow-Detroit Edison Project - MI 0-02  

Office of Legacy Management (LM)

Dow-Detroit Edison Project - MI Dow-Detroit Edison Project - MI 0-02 FUSRAP Considered Sites Site: Dow-Detroit Edison Project (MI.0-02 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Detroit , Michigan MI.0-02-1 Evaluation Year: 1987 MI.0-02-1 Site Operations: Performed reference design work for a special fast breeder type reactor. MI.0-02-1 Site Disposition: Eliminated - No radioactive material handled at the site MI.0-02-1 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None MI.0-02-1 Radiological Survey(s): no Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to Dow-Detroit Edison Project MI.0-02-1 - DOE Memorandum/Checklist; S.Jones to the File; Subject:

374

DOE Collaborates with National Geographic's JASON Project on Award-Winning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Collaborates with National Geographic's JASON Project on Collaborates with National Geographic's JASON Project on Award-Winning Curriculum DOE Collaborates with National Geographic's JASON Project on Award-Winning Curriculum June 17, 2011 - 1:00pm Addthis Washington, DC - A new JASON Project geology unit, developed with assistance from the Office of Fossil Energy's National Energy Technology Laboratory (NETL), has earned a prestigious "CODiE Award" as the nation's Best Science or Health curriculum. Operation: Tectonic Fury--which unlocks the Earth's geologic mysteries through investigation of its past, present and future - is the fourth unit in a new line of middle school science curricula developed by the nonprofit subsidiary of the National Geographic Society. The CODiE Awards are presented annually by the Software & Information Industry Association

375

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drilling Projects Demonstrate Significant CO2 Storage Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been completed in projects supported by the U.S. Department of Energy. If the potential of the sites is eventually fulfilled, they could safely and permanently store combined CO2 emissions equivalent to that produced by more than 11 million passenger vehicles annually or from the electricity use of more than 7 million homes for one year, according to Environmental

376

DOE Announces $27 Million to Reduce Costs of Solar Energy Projects,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27 Million to Reduce Costs of Solar Energy Projects, 27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations DOE Announces $27 Million to Reduce Costs of Solar Energy Projects, Streamline Permitting and Installations June 1, 2011 - 12:00am Addthis WASHINGTON, DC - As part of the Obama Administration's SunShot Initiative to make solar energy cost-competitive with fossil fuels within the decade, U.S. Department of Energy Secretary Steven Chu today announced the availability of more than $27 million in new funding that will reduce the non-hardware costs of solar energy projects, a critical element in bringing down the overall costs of installed solar energy systems. The funding will support a $12.5 million challenge to encourage cities and counties to compete to streamline and digitize permitting processes, as

377

ASCR Recovery Act Projects | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Miscellaneous » ASCR Recovery Act Projects Miscellaneous » ASCR Recovery Act Projects Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) News & Resources ASCR Discovery Monthly News Roundup News Archives ASCR Program Documents ASCR Workshops and Conferences ASCR Presentations 100Gbps Science Network Related Links Contact Information Advanced Scientific Computing Research U.S. Department of Energy SC-21/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-7486 F: (301) 903-4846 E: sc.ascr@science.doe.gov More Information » Miscellaneous ASCR Recovery Act Projects Print Text Size: A A A RSS Feeds FeedbackShare Page ASCR Recovery Act Projects

378

DOE-Sponsored Project Pushes the Limits of Seismic-While-Drilling  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Pushes the Limits of Seismic-While-Drilling Project Pushes the Limits of Seismic-While-Drilling Technology DOE-Sponsored Project Pushes the Limits of Seismic-While-Drilling Technology August 12, 2009 - 1:00pm Addthis Washington, DC - In a project sponsored by the U.S. Department of Energy, Technology International Inc. has developed a breakthrough borehole imaging system that stands on the cusp of commercialization. By pushing the limits of seismic-while-drilling technology, the patent-pending SeismicPULSER system provides more accurate geo-steering for the discovery of new oil and natural gas reserves, facilitating new field development and improving well economics. Drill-bit seismic-while-drilling techniques use a downhole acoustic source and receivers at the surface to create real-time images that allow

379

DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology Water  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Projects for Up to $7.3 Million for R&D Clean Selects Projects for Up to $7.3 Million for R&D Clean Technology Water Power Projects DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology Water Power Projects September 18, 2008 - 3:43pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of projects for negotiation of award of up to $7.3 million to 14 research teams, with a cost-shared value of over $18 million, under the DOE's competitive solicitation for Advanced Water Power Projects. The projects will advance commercial viability, cost-competitiveness, and market acceptance of new technologies that can harness renewable energy from oceans and rivers. These efforts will further the President's Advanced Energy Initiative, which dramatically increases clean-energy research

380

DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology Water  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selects Projects for Up to $7.3 Million for R&D Clean Selects Projects for Up to $7.3 Million for R&D Clean Technology Water Power Projects DOE Selects Projects for Up to $7.3 Million for R&D Clean Technology Water Power Projects September 18, 2008 - 3:43pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the selection of projects for negotiation of award of up to $7.3 million to 14 research teams, with a cost-shared value of over $18 million, under the DOE's competitive solicitation for Advanced Water Power Projects. The projects will advance commercial viability, cost-competitiveness, and market acceptance of new technologies that can harness renewable energy from oceans and rivers. These efforts will further the President's Advanced Energy Initiative, which dramatically increases clean-energy research

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE/EIS-0340; Grand Ronde … Imnaha Spring Chinook Hatchery Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 NORTHEAST OREGON HATCHERY PROGRAM GRANDE RONDE - IMNAHA SPRING CHINOOK HATCHERY PROJECT DOE/EIS-0340 Draft Environmental Impact Statement Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Draft Environmental Impact Statement (DOE/EIS-0340) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Federal Agencies: U.S. Department of Interior, Fish and Wildlife Service (USFWS); U.S. Department of Commerce, National Oceanic and Atmospheric Administration National Marine Fisheries Service (NOAA Fisheries); U.S. Department of Agriculture, Forest Service Cooperating Tribes: Nez Perce Tribe (NPT), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Cooperating State Agencies: Oregon Department of Fish and Wildlife (ODFW)

382

DOE/Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia  

NLE Websites -- All DOE Office Websites (Extended Search)

Boeing Sponsored Projects in Boeing Sponsored Projects in Aviation Fuel Cell Technology at Sandia Lennie Klebanoff and Joe Pratt Sandia National Laboratories Livermore CA 94551 September 30, 2010 "Exceptional Service in the National Interest" DOE-DOD Workshop on Uses of Fuel Cells in Aviation * ~ 8,300 employees * ~ 1,500 PhDs; ~2800 MS/MA * ~ 700 on-site contractors Sandia National Laboratories Sandia is a government-owned/contractor operated (GOCO) facility. Sandia Corporation, a Lockheed Martin company, manages Sandia for the U.S. Department of Energy's National Nuclear Security Administration. Website: www.sandia.gov Annual Budget ~ $2.2 Billion ($1.3 Billion DOE, $0.9 Billion work for others) 3 Origin: Boeing Interested in Bringing Fuel Cell Technology to Ground Support Equipment (GSE)

383

NETL: News Release - DOE Selects Projects to Improve 'Stripper' Gas Well  

NLE Websites -- All DOE Office Websites (Extended Search)

June 13, 2000 June 13, 2000 DOE Selects Project to Improve 'Stripper' Gas Well Economics By Using Low-Cost Clean Coal Product to Filter Waste Water In its third and final round of competition for projects that can help sustain natural gas production from "stripper" wells, the U.S. Department of Energy has selected a proposal to test a coal-based filtering material that could sharply reduce the costs of disposing of waste water from these low-volume wells. The Western SynCoal Clean Coal Plant The Rosebud SynCoal® demonstration plant near Colstrip, Montana, was built in DOE's Clean Coal Technology Program. Its upgraded coal product, originally intended as a high quality fuel for power plants, may also be a low cost filter material for oil and gas well waste water.

384

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

1992-02-01T23:59:59.000Z

385

NETL: Methane Hydrates - DOE/NETL Projects - Natural Gas Hydrates in  

NLE Websites -- All DOE Office Websites (Extended Search)

Natural Gas Hydrates in Permafrost and Marine Settings: Resources, Properties, and Environmental Issues Last Reviewed 12/30/2013 Natural Gas Hydrates in Permafrost and Marine Settings: Resources, Properties, and Environmental Issues Last Reviewed 12/30/2013 DE-FE0002911 Goal The objective of this DOE-USGS Interagency Agreement is to provide world-class expertise and research in support of the goals of the 2005 Energy Act for National Methane Hydrates R&D, the DOE-led U.S. interagency roadmap for gas hydrates research, and elements of the USGS mission related to energy resources, global climate, and geohazards. This project extends USGS support to the DOE Methane Hydrate R&D Program previously conducted under DE-AI26-05NT42496. Performer U.S. Geological Survey at Woods Hole, MA, Denver, CO, and Menlo Park, CA Background The USGS Interagency Agreement (IA) involves laboratory research and

386

DOE Office of Indian Energy Renewable Energy Project Development: Advanced Financing Concepts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concepts Concepts Why It Makes Sense to Bring on a Third-Party Partner Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Concepts for Financing Renewable Energy Projects on Tribal Lands - Levelized Cost of Energy (LCOE) - Business Structures - Tax-Equity Partnerships - Introduction  Additional Information and Resources 2 Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in Indian Country.

387

NETL: News Release - DOE Selects Projects to Advance Technologies for the  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2010 8, 2010 DOE Selects Projects to Advance Technologies for the Co-Production of Power and Hydrogen, Fuels or Chemicals from Coal-Biomass Feedstocks Washington, DC - Eight projects that will focus on gasification of coal/biomass to produce synthetic gas (syngas) have been selected for further development by the U.S. Department of Energy (DOE). The total value of the projects is approximately $8.2 million, with $6.4 million of DOE funding and $1.8 million of non-Federal cost sharing. Syngas is a mixture of predominantly carbon monoxide and hydrogen which can subsequently be converted either to power, fuels, or chemicals. The research is aimed at making use of the nation's abundant coal and biomass resources to produce affordable power, fuels and chemicals in a safe and environmentally clean manner. In addition, the production of fuels and chemicals from coal-biomass feedstocks has the added benefit of reducing overall greenhouse gas emissions.

388

ESS 2012 Peer Review - DOE-OE FY12 Electrical Energy Storage Demonstration Projects - Dan Borneo, SNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-OE FY12 Electrical DOE-OE FY12 Electrical Energy Storage Demonstration Projects The Renaissance Hotel Washington, D.C. September 2012 Presented by Dan Borneo SAND Document 5312608 SAND2012-7453 C Acknowledgements I would like to thank the DOE's Office of Electricity and Dr. Imre Gyuk, Program Manager of the Electrical Energy Storage Program, for their support and funding of the Energy Storage Demonstration Projects. 2 EES Emerging Technology Demonstrations Presentation Outline  Project Overview  Problem Statement  Approach  Current Status  Path Forward - Next Steps  Geographical Representation of Projects  Summary Chart of Projects  Brief Descriptions of Individual Projects  Concluding Remarks 3 EES Demonstrations Project Overview  Problem Statement

389

Research Progress in the DOE/SERI Amorphous Silicon Research Project  

SciTech Connect

The Amorphous Silicon Research Project (ASRP), established at the Solar Energy Research Institute (SERI) in 1983, is responsible for all U.S. DOE government-supported research activities in the field of amorphous silicon photovoltaics. The objectives and research directions of the project have been established by a Five-Year Research Plan developed at SERI in cooperation with the Department of Energy in 1984. In order to accomplish project goals, research is performed by a combination of i) multi-year programs consisting of multi-disciplinary research teams based on strong government/industry partnerships and ii) basic research performed in university, government, and industrial laboratories. A summary of recent research progress in the ASRP program is presented.

Sabisky, E.; Wallace, W.; Stafford, B.; Sadlon, K.; Luft, W.

1985-04-01T23:59:59.000Z

390

DOE-Funded Research Projects Win 41 R&D100 Awards for 2006 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Funded Research Projects Win 41 R&D100 Awards for 2006 DOE-Funded Research Projects Win 41 R&D100 Awards for 2006 DOE-Funded Research Projects Win 41 R&D100 Awards for 2006 October 19, 2006 - 9:08am Addthis WASHINGTON, DC - Secretary of Energy Samuel W. Bodman today congratulated researchers at 12 DOE national laboratories who won 41 of the 100 awards given by R&D Magazine. The awards are presented annually in recognition of the most outstanding technology developments with commercial potential. R&D Magazine will make the awards tonight at its 44th annual R&D 100 Awards ceremony in Chicago. Sixteen of the DOE- funded awards are shared with businesses and universities. "DOE's research labs across the country are making discoveries every day that enhance our nation's energy, economic and national security,"

391

DOE Standards Actions, November 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

392

NETL: News Release - DOE Selects 4 Projects that Increase Efficiency, Lower  

NLE Websites -- All DOE Office Websites (Extended Search)

11, 2000 11, 2000 DOE Selects 4 Projects That Increase Efficiency, Lower Energy-Production Costs, Emissions from Coal Plants Four new research projects selected this week by the U.S. Department of Energy show that innovations to boost the performance of tomorrow's power plants can take many forms - from new ways to mix biomass and municipal waste into future fuels to new microbiological techniques that minimize water intake obstructions. The four projects are among the more than 40 that have emerged as winners in a broad program-wide competition in the department's Office of Fossil Energy.The common thread in this set of projects is that all can improve efficiency and help defray the costs of energy production from fossil fuel energy systems. The Energy Department will provide $1.4 million to the four winning organizations. The private sector partners will more than match the federal funding, providing about $2 million for the new research ventures.The winning projects are as follows. Dollar amounts are preliminary and may change during upcoming negotiations.

393

NETL: News Release - DOE Selects Projects to Develop Pre-Combustion Carbon  

NLE Websites -- All DOE Office Websites (Extended Search)

June 11, 2009 June 11, 2009 DOE Selects Projects to Develop Pre-Combustion Carbon Capture Technologies for Coal-Based Gasification Plants Washington, D.C. - The U.S. Department of Energy (DOE) today announced the selection of nine projects that will develop pre-combustion carbon capture technologies that can reduce CO2 emissions in future coal-based integrated gasification combined cycle (IGCC) power plants. The projects, totaling nearly $14.4 million, will be managed by the Office of Fossil Energy's National Energy Technology Laboratory. Pre-combustion processes convert fossil fuels into a gaseous mixture of hydrogen and CO2 prior to combustion. The CO2 is then separated and the hydrogen-rich gas can be used in power plants. Compared with post-combustion processes, the pressure and concentration of CO2 in pre-combustion processes are relatively high - offering the potential to apply novel CO2 capture technologies such as membranes, solvents and sorbents.

394
395

NETL: News Release - DOE Project Revives Oil Production in Abandoned Fields  

NLE Websites -- All DOE Office Websites (Extended Search)

4 , 2006 4 , 2006 DOE Project Revives Oil Production in Abandoned Fields on Osage Tribal Lands Novel Oil Recovery Technique Developed Under DOE's Native American Initiative WASHINGTON, DC - A technology developed with U.S. Department of Energy funding has revived oil production in two abandoned oilfields on Osage Indian tribal lands in northeastern Oklahoma, and demonstrated a technology that could add billions of barrels of additional domestic oil production in declining fields. Production has jumped from zero to more than 100 barrels of oil per day in the two Osage County, Okla., fields, one of which is more than 100 years old. The technology was successfully pilot-tested in the century-old field, and using the knowledge gained, the technology was applied to a neighboring field with comparable success. This suggests that such approaches could revitalize thousands of other seemingly depleted oilfields across America's Midcontinent region.

396

Project Listings by Organization, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

25 25 FY 2007 Annual Progress Report DOE Hydrogen Program XVI. Project Listings by Organization 3M V.E.1 Novel Approach to Non-Precious Metal Catalysts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .820 V.E.4 Advanced Cathode Catalysts and Supports for PEM Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .833 V.L.2 Adaptive Stack With Subdivided Cells for Improved Stability, Reliability, and Durability Under Automotive Load Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .874 V.M.2 Membranes and MEA's for Dry, Hot Operating Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .885 V.M.3 New Polyelectrolyte Materials for High Temperature Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

397

Projects Listings by State, excerpt from 2007 DOE Hydrogen Program Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2007 Annual Progress Report DOE Hydrogen Program XV. Project Listings by State Alabama II.I.7 Production and Storage of Hydrogen from Coal Using C1 Chemistry . . . . . . . . . . . . . . . . . . . . . . . . .207 IV.B.5k Main Group Element and Organic Chemistry for Hydrogen Storage and Activation . . . . . . . . . . . . . 514 V.D.21 Nanostructured Catalysts for Fuel Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .803 V.M.2 Membranes and MEA's for Dry, Hot Operating Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .885 V.R.2 Water Transport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing, and Design Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1042

398

NETL: News Release - DOE Funds Six New Projects Aimed at Alternate Hydrogen  

NLE Websites -- All DOE Office Websites (Extended Search)

September 7, 2006 September 7, 2006 DOE Funds Six New Projects Aimed at Alternate Hydrogen Production and Utilization WASHINGTON, DC - The Department of Energy today announced the selection of six cost-shared research and development projects that will aid in alternate hydrogen production and greater hydrogen utilization. The selections help to fulfill President Bush's Hydrogen Fuel Initiative which describes a hydrogen economy that minimizes America's dependence on foreign oil, reduces greenhouse gas emissions, and provides funding for hydrogen research and development. Hydrogen is considered a potential energy carrier for the future, and it may be produced from hydrogen-containing materials such as water and fossil fuels. Until other resources are available to produce hydrogen at lower costs, production from coal is the most economical source.

399

DOE Announces Webinars on Getting Buy-In for Energy Efficiency Projects and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Getting Buy-In for Energy Efficiency Getting Buy-In for Energy Efficiency Projects and the Bioenergy Knowledge Discovery Framework DOE Announces Webinars on Getting Buy-In for Energy Efficiency Projects and the Bioenergy Knowledge Discovery Framework September 26, 2013 - 9:51am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however, advanced registration is typically required. You can also watch archived webinars and browse previously aired videos, slides, and transcripts. Upcoming Webinars October 1: Live Webinar on Building the Case for Energy Efficiency with Financial Decision-makers Webinar Sponsor: EERE's Better Buildings Challenge

400

DOE 2010 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012)  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012) 10 Safety and Security Reform Project - HSS Directives Disposition and Status (December 4, 2012) Page 1 of 3 2010 HSS Directives Disposition Status Secretary of Energy Notice SEN-35-91, Nuclear Safety Policy Revise Complete - see Policy 420.1. Order 5400.5, Radiation Protection of the Public and the Environment Revise Complete - see Order 458.1. Order 5480.19, Conduct of Operations Requirements for DOE Facilities Revise Complete - see Order 422.1. Order 5480.20A, Personnel Selection, Training, Qualification, and Certification Requirements Revise Complete - see Order 426.2. Order 5480.30, Nuclear Reactor Design Criteria Re-certify Complete - re-certified. Manual 140.1-1B, Interface with the Defense Nuclear Facilities Safety Board Re-certify Complete - re-certified.

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NETL: News Release - DOE Selects Projects Targeting America's "Tight" Gas  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2006 7, 2006 DOE Selects Projects Targeting America's "Tight" Gas Resources Research to Help Unlock Nation's Largest Growing Source of Natural Gas WASHINGTON, DC - The Department of Energy today announced the selection of two cost-shared research and development projects targeting America's major source of natural gas: low-permeability or "tight" gas formations. Tight gas is the largest of three so-called unconventional gas resources?the other two being coalbed methane (natural gas) and gas shales. Production of unconventional gas in the United States represents about 40 percent of the Nation's total gas output in 2004, but could grow to 50 percent by 2030 if advanced technologies are developed and implemented. The constraints on producing tight gas are due to the impermeable nature of the reservoir rocks, small reservoir compartments, abnormal (high or low) pressures, difficulty in predicting natural fractures that aid gas flow rates, and need to predict and avoid reservoirs that produce large volumes of water.

402

DOE/EA-1075 ENVIRONMENTAL ASSESSMENT PROPOSED CASEY'S POND IMPROVEMENT PROJECT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75 75 ENVIRONMENTAL ASSESSMENT PROPOSED CASEY'S POND IMPROVEMENT PROJECT MAY 1995 DISTRIBUTION OF THIS DOCUMENT I S UNLMlTED DOE /EA4075 ENVIRONMENTAL ASSESSMENT PROPOSED CASEY'S POND IMPROVEMENT PROJECT DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied. or assumes any legal liability or respnsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark,

403

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

404

NETL: News Release - DOE Selects First Vision 21 Projects to Design the  

NLE Websites -- All DOE Office Websites (Extended Search)

March 7, 2000 March 7, 2000 DOE Selects First Vision 21 Projects to Design the Energy Plant of the Future The pollution-free energy plant of the future is beginning to take shape with the Department of Energy's selection this week of the first industry-led design and engineering projects for the futuristic concept's core technologies. The projects are part of the department's Vision 21 program, an effort to develop a revolutionary new energy system that could be commercially ready by the year 2015."The projects we are announcing today will begin carrying the energy industry beyond the traditional concept of a power plant," said Energy Secretary Bill Richardson. "Vision 21 is intended to break the mold of today's conventional 'one fuel-one product' thinking."Rather than producing a single product from a single fuel -- for example, electricity from coal -- Vision 21 plants would be capable of processing a wide range of fuels such as coal, natural gas, biomass or municipal wastes, and generating multiple forms of energy such as electricity, transportation fuels and chemicals. The energy plants would produce virtually no emissions.

405

DOE-Funded Research Projects Win 39 R&D Awards for 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-Funded Research Projects Win 39 R&D Awards for 2010 DOE-Funded Research Projects Win 39 R&D Awards for 2010 WASHINGTON, DC - U.S. Department of Energy researchers have won 39 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted awards are presented annually in recognition of exceptional new products, processes, materials or software developed throughout the world and introduced into the market the previous year. "I want to congratulate all of this year's winners on their awards and thank them for their work," Energy Secretary Steven Chu said. "The large number of winners from the Department of Energy's national labs every year is a clear sign that our labs are doing some of the most innovative research in the world. This work benefits us all by enhancing America's competitiveness, ensuring our security, providing new energy solutions and expanding the frontiers of our knowledge. Our national labs are truly national treasures, and it is wonderful to see their work recognized once again."

406

NETL: News Release - DOE-Sponsored IGCC Project in Texas Takes Important  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 1, 2011 DOE-Sponsored IGCC Project in Texas Takes Important Step Forward MOU Provides for Electricity Purchase from First-of-a-Kind Commercial IGCC Power Plant Washington, DC - A newly signed memorandum of understanding (MOU) for the purchase of electricity produced by the Texas Clean Energy Project (TCEP) is an important step forward for what will be one of the world's most advanced and cleanest coal-based power plants, funded in part by the U.S. Department of Energy (DOE). Under the MOU, CPS Energy - a municipally owned utility serving San Antonio, Texas - will purchase electricity generated by the first-of-a-kind commercial clean coal power plant, starting in mid 2014. TCEP, a 400-megawatt integrated gasification combined cycle (IGCC) facility located about 15 miles west of Odessa, will capture 90 percent of its carbon dioxide (CO2) - approximately 3 million tons annually - more than any power plant of commercial scale operating anywhere in the world.

407

DOE/EA-1611: Mitigation Action Plan for the Colorado Highlands Wind Project, Logan County, Colorado (01/19/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 19, 2009 January 19, 2009 Mitigation Action Plan Colorado Highlands Wind Project Logan County, Colorado Project Overview. Western Area Power Administration (Western) a power marketing agency of the U.S. Department of Energy (DOE) proposes to approve interconnection of the Project with Western's transmission system and the connected action of the Project. Colorado Highlands Wind LLC (CHWP) applied (via predecessor project owner Wind Energy Prototypes) to Western to interconnect a 90-megawatt (MW) wind power facility with Western's existing Sterling-Frenchman Creek 115-kV transmission line. Approval of the Interconnection Agreement would allow the Project to interconnect with Western's proposed Wildhorse Creek Switchyard. In accordance with the DOE NEPA

408

NETL: News Release - DOE Selects Projects to Reduce Mercury Emissions from  

NLE Websites -- All DOE Office Websites (Extended Search)

Release Date: February 3, 2006 DOE Selects Projects to Reduce Mercury Emissions from Coal-Fired Power Plants Focus is on Cost-Effective Technology to Achieve 90 Percent Mercury Removal WASHINGTON, DC - In a continued effort to promote clean coal technologies, the U.S. Department of Energy has selected 12 projects aimed at reducing mercury emissions from coal-fired power plants. The projects' overall focus is on field-testing advanced post-combustion mercury control technologies that achieve at least 90 percent mercury removal with a cost reduction of 50 percent or more. Other objectives center on field-testing in specific areas of need, and bench-scale through pilot-scale testing of novel mercury control technologies. America's coal-fired power plants emit around 48 tons of mercury each year. In March 2005, the U.S. Environmental Protection Agency issued the Clean Air Mercury Rule to permanently cap and reduce these emissions, requiring an overall average reduction of nearly 70 percent by 2018.

409

Does  

NLE Websites -- All DOE Office Websites (Extended Search)

Does Does the cellulose-binding module move on the cellulose surface? Yu-San Liu Æ Yining Zeng Æ Yonghua Luo Æ Qi Xu Æ Michael E. Himmel Æ Steve J. Smith Æ Shi-You Ding Received: 26 November 2008 / Accepted: 11 May 2009 / Published online: 19 June 2009 Ó Springer Science+Business Media B.V. 2009 Abstract Exoglucanases are key enzymes required for the efficient hydrolysis of crystalline cellulose. It has been proposed that exoglucanases hydrolyze cellulose chains in a processive manner to produce primarily cellobiose. Usually, two functional modules are involved in the processive mechanism: a catalytic module and a carbohydrate-binding module (CBM). In this report, single molecule tracking techniques were used to analyze the molecular motion of CBMs labeled with quantum dots (QDs) and bound to cellulose crystals. By tracking the single QD, we observed that the family 2 CBM from

410

DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

lex lex 00023 L Projed Tide: u.s. DEPARTMENT OF ENERGY OFFICE OF RIVER PROTECTION NEPA REVIEW SCREENING FORM Phase IL Determination of manium in ~water. U. Project DeKriptioD a&d LHaDea (iDdudiBg Time Period Ova- wlDdr plopasetl actioB will oceur and Projed' DimeDsioas - e.g.. acres dispJaced/distwbal,. eunatioft ~~ ek..): The objective of this project is to desi~ build, deploy and test a field deployable insttt:tm.ent that can perform near-rea1 ~ fully autonomous measurements of uranium in contaminated groundwater plmnes.. The approximate dimensions of the deployable uranium ~ are Z x 2 x 4 feet. The system periodically samples Y«1lter from existing aquifer tubes., and. the sampies are analyzed for u.ranium concentration using a colorimetric cbelation sysWn.. Analytical teSUlts are

411

Appendix C: DOE Super-ESPC Project Acceptance Guidelines and Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidelines, Checklist, and Contract Clauses for Government Acceptance Guidelines, Checklist, and Contract Clauses for Government Acceptance of DOE Super-ESPC Projects  ECM Installation: All ECMs are installed in accordance with plans, specifications, standards, and other contract documents (sometimes by the Contractor, often by a subcontractor and always over a period of months).  Inspection, start-up, testing and commissioning. All ECMs are inspected, brought on line, tested, and commissioned interactively with all related Government-owned or Contractor-installed ECMs. Again, the ECMs should be operating in accordance with the design, plans, specifications, standards and other contract documents and manufacturer's recommendations. Individual ECMs may go through start-up and testing, but all interrelated

412

DOE/SC-ARM-13-014 Biomass Burning Observation Project Science  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Biomass Burning Observation Project Science Plan LI Kleinman AJ Sedlacek September 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

413

NETL: News Release - DOE Selects 2 Projects to Help Boost Gas Flow from  

NLE Websites -- All DOE Office Websites (Extended Search)

August 15, 2001 August 15, 2001 DOE Selects 2 Projects to Help Boost Gas Flow from Low-Permeability Formations New Technologies Targeted at Future Gas Production From "Tight" Formations in Western U.S. MORGANTOWN, WV - America has vast resources of natural gas, but President Bush's National Energy Policy cautions that domestic production of the easier "conventional" gas could peak as early as 2015. To help prepare for the day when the Nation's increasing demand for clean-burning natural gas will have to be met by gas trapped in denser, more difficult-to-produce "unconventional" formations, the U.S. Department of Energy has selected two firms to develop advanced methods for locating and producing these low permeability gas reservoirs.

414

DOE/EIS-0290 Advanced Mixed Waste Treatment Project (January 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1999/Summary.HTML[6/24/2011 1:21:11 PM] Summary-1999/Summary.HTML[6/24/2011 1:21:11 PM] SUMMARY The U.S. Department of Energy (DOE) prepared this environmental impact statement (EIS) on the proposed Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho National Environmental and Engineering Laboratory (INEEL) in compliance with the National Environmental Policy Act (NEPA). The National Environmental Policy Act Process NEPA is a Federal law that serves as the basic national charter for protection of the environment. For major Federal actions that may significantly affect the quality of the human environment, NEPA requires Federal agencies to prepare a detailed statement that includes the potential environmental impacts of the proposed action and other specified information. A fundamental objective of NEPA is to foster better decision making by ensuring that high quality

415

Final Report for DOE Project DE-FC07-99CH11010  

SciTech Connect

Department of Energy award number DE-FC07-99CH11010, Enhanced Utilization of Corn Based Biomaterials, supported a technology development program sponsored by Cargill Dow LLC from September 30, 1999 through June 30, 2003. The work involved fundamental scientific studies on poly lactic acid (PLA), a new environmentally benign plastic material from renewable resources. DOE funds supported academic research at the Colorado School of Mines and the National Renewable Energy Laboratory (NREL), and industry cost share was directed towards applied research into new product development utilizing the fundamental information generated by the academic partners. Under the arrangement of the grant, the fundamental information is published so that other companies can utilize it in evaluating the applicability of PLA in their own products. The overall project objective is to increase the utilization of PLA, a renewable resource based plastic, currently produced from fermented corn sugar.

Jed Randall; Robert Kean

2003-10-22T23:59:59.000Z

416

DOE-Funded Research Projects Win 39 R&D Awards for 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 R&D Awards for 2010 39 R&D Awards for 2010 DOE-Funded Research Projects Win 39 R&D Awards for 2010 July 9, 2010 - 12:00am Addthis WASHINGTON, DC - U.S. Department of Energy researchers have won 39 of the 100 awards given out this year by R&D Magazine for the most outstanding technology developments with promising commercial potential. The coveted awards are presented annually in recognition of exceptional new products, processes, materials or software developed throughout the world and introduced into the market the previous year. "I want to congratulate all of this year's winners on their awards and thank them for their work," Energy Secretary Steven Chu said. "The large number of winners from the Department of Energy's national labs every year

417

Blast Furnace Granulated Coal Injection System Demonstration Project: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Blast Furnace Granulated Coal Injection System Demonstration Project: A DOE Assessment June 2000 U. S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein

418

H. R. 3113: an act providing for the coordinated operation of the Central Valley project and the State water project in California. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, March 25, 1985  

SciTech Connect

The House Committee on Energy and Natural Resources rewrote the Bill coordinating operations of the Central Valley Project in California and the state water project, and limited the Secretary of the Interior to no more than 75% of the Central Valley Project's annual yield. The Bill specifies procedures for water delivery contracts and reimbursements. Title II deals with the preservation of the Suisin Marsh District; Title III with the reclamation of small projects; and Title IV with contract validation. The document contains both the original and the amended wording of H.R. 3113.

Not Available

1986-01-01T23:59:59.000Z

419

NETL: News Release - DOE Selects Five NOx-Control Projects to Combat Acid  

NLE Websites -- All DOE Office Websites (Extended Search)

November 5, 2004 November 5, 2004 DOE Selects Five NOx-Control Projects to Combat Acid Rain and Smog Industry Partners to Focus on Reducing Emissions While Cutting Energy Costs PITTSBURGH, PA - Continuing efforts to cut acid rain and smog-producing nitrogen oxides (NOx) have prompted the U.S. Department of Energy to partner with industry experts to develop advanced NOx-control technologies. With the selection of five new NOx-control projects, the Energy Department continues as a leader in developing advanced technologies to achieve environmental compliance for the nation's fleet of coal-fired power plants. Although today's NOx-control workhorses, such as low-NOx burners and selective catalytic reduction (SCR), have been successfully deployed to address existing regulations, proposed regulations will require deeper cuts in NOx emissions, at a greater number of generating facilities. Many of the smaller affected plants will not be able to cost-effectively use today's technologies; these are the focus of the advanced technologies selected in this announcement.

420

DOE  

Gasoline and Diesel Fuel Update (EIA)

DOE DOE /E/A- 0202( 83//Q J Sh or t-T er m En er gy O ut lo ok a to m Quar terly Proje ction s Febru ary 1983 Ene rgy Info rma tion Adm inist ratio n Was hing ton, D.C. t rt jrt .or t lor t lor t .lor t- ior t- ior t <.o rt ort . m .er m -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -T erm -T erm -T erm Nrm ue rgy En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y ^n erg y Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Sh ort -T erm 1 Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

GRR/Elements/18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to  

Open Energy Info (EERE)

GRR/Elements/18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to GRR/Elements/18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to Land in a Diffused Manner or Affect Groundwater Quality < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to Land in a Diffused Manner or Affect Groundwater Quality If waste is discharged to land in a diffused manner, such as that it causes soil erosion or the discharge affects groundwater, the developer must file a Report of Waste Discharge application (Form 200) and the necessary supplemental information with the appropriate Regional Water Quality Control Board (RWQCB) at least 120 days before beginning to discharge waste. Logic Chain No Parents

422

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

1992-03-01T23:59:59.000Z

423

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 March 2009 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 Bonneville Power Administration March 2009 Bonneville Power Administration i Table of Contents Chapter 1 Need for and Purpose of Action ............................................................... 1-1 1.1 Introduction .....................................................................................................

424

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

425

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

426

Why does project planning fail; A look at the basics of planning in an era of sophisticated project control tools  

SciTech Connect

The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's.

Foley, M. (Liberty Consulting Group, Atlanta, GA (US)); Luciano, G. (Cleveland Electric Illuminating Co., OH (United States))

1991-01-01T23:59:59.000Z

427

DOE Standards Actions, February 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Standards Projects Initiated Technical Standards Projects Initiated The following DOE technical standards project was recently initi- ated. If you have any questions or are interested in participating in the development of this standard, please contact the persons listed below. • Definitions and Acronyms to Good Practices for Maintenance at DOE Nuclear Facilities, Project Number MNTY-0025; Charles B. Ramsey, EH-31; 301-903-5999, Chuck.Ramsey @hq.doe.gov. DOE Technical Standards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this docu-

428

CLEERS Coordination & Joint Development of Benchmark Kinetics...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR 2012 DOE Hydrogen and Fuel...

429

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CLEERS Coordination & Development of Catalyst Process Kinetic Data CLEERS Coordination & Development of Catalyst Process Kinetic Data 2009 DOE Hydrogen Program and Vehicle...

430

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& coordinate DOE research efforts (CLEERS Coordination) * Develop detailed technical data required to simulate energy efficient emission controls (LNT & SCR Kinetics, Sulfur &...

431

DOE/EA-1544: Environmental Assessment for the Proposed Anadarko/Veritas Salt Creek 3D Vibroseis Project (June 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

___________________________ ___________________________ Salt Creek 3D Vibroseis Project Environmental Assessment BLM Casper Field Office June 2005 Page 1 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED ANADARKO / VERITAS SALT CREEK 3D VIBROSEIS PROJECT DOE EA No. EA-1544 BLM Case No. WYW-163071 BLM EA No. WY- 060-EA05-95 WOGCC Permit No. 025-05-015G _________________________________________________________________________________________________ Salt Creek 3D Vibroseis Project Environmental Assessment BLM Casper Field Office June 2005 Page 2 TABLE OF CONTENTS 1.0 PURPOSE AND NEED 1.1 Introduction 3 1.2 Purpose and need for action 3 1.3 Conformance with land use plan 3 1.4 Relationship to statutes, regulations, 4

432

Funded Projects NEPA Does Not Apply Categorical Exclusions (CE) CE Pending  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 31, 2011 March 31, 2011 Page 1 of 2 # of ARRA Funded Projects NEPA Does Not Apply Categorical Exclusions (CE) CE Pending CE Done Environmental Assessments (EA) EA Pending EA Done Environmental Impact Statements (EIS) EIS Pending EIS Done All NEPA Actions All Withdrawn Actions All Pending NEPA Actions All Completed NEPA Actions OVERALL TOTALS: 273,968 4,280 182,692 374 182,318 7,138 278 6,860 864 34 830 190,694 1,791 686 190,008 Department of Agriculture (USDA): 184,762 254 96,835 1 96,834 1,504 0 1,504 150 0 150 98,489 338 1 98,488 Agricultural Research Service (ARS) 41 2 38 0 38 1 0 1 0 0 0 39 0 0 39 Farm Service Agency (FSA) 87,336 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Food and Nutrition Service (FNS) 251 0 4 0 4 0 0 0 0 0 0 4 0 0 4 Foreign Agricultural Service (FAS) 3 0 3 0 3 0 0 0 0 0 0 3 0 0 3 U.S. Forest Service (USFS) 705 252 1,408 0 1,408 533 0 533 121 0 121 2,062 8 0 2,062 Natural Resources Conservation Service (NRCS)

433

Results of the Boeing/DOE DECC Phase 1 stirling engine project  

SciTech Connect

Phase I of Boeing Company/DOE Dish Engine Critical Component (DECC) Project started in April of 1998 and was completed in 1999. The Phase I objectives, schedule, and test results are presented in this paper. These data shows the power, energy, and mirror performance are comparable to that when the hardware was first manufactured 15 years ago. During the Phase I and initial Phase II test period the on-sun system accumulated over 3,800 hours of solar-powered operating time, accumulated over 4,500 hours of concentrator solar tracking time, and generated over 50,000 kWh of grid-compatible electrical energy. The data also shows that the system was available 95 {percent} of the time when the sun's insolation level was above approximately 300 w/m{sup 2}, and achieved a daily energy efficiency between 20{percent} and 26{percent}. A second concentrator was refurbished during Phase I and accumulated over 2,200 hours of solar track time. A second Stirling engine operated 24 hours a day in a test cell in Sweden and accumulated over 6,000 test hours. Discussion of daily operation shows no major problems encountered during the testing that would prevent commercialization of the technology. Further analysis of the test data shows that system servicing with hydrogen, coolant and lubricating oil should not be a major O and M cost.

STONE,KENNETH W.; CLARK,TERRY; NELVING,HANS; DIVER JR.,RICHARD B.

2000-03-02T23:59:59.000Z

434

Application of microseismic technology to hydraulic fracture diagnostics: GRI/DOE Field Fracturing Multi-Sites Project  

SciTech Connect

The objective of the Field Fracturing Multi-Sites Project (M-Site) is to conduct field experiments and analyze data that will result in definitive determinations of hydraulic fracture dimensions using remote well and treatment well diagnostic techniques. In addition, experiments will be conducted to provide data that will resolve significant unknowns with regard to hydraulic fracture modeling, fracture fluid rheology and fracture treatment design. These experiments will be supported by a well-characterized subsurface environment as well as surface facilities and equipment conducive to acquiring high-quality data. It is anticipated that the project`s research advancements will provide a foundation for a fracture diagnostic service industry and hydraulic fracture optimization based on measured fracture response. The M-Site Project is jointly sponsored by the Gas Research Institute (GRI) and the US Department of Energy (DOE). The site developed for M-Site hydraulic fracture experimentation is the former DOE Multiwell Experiment (MWX) site located near Rifle, Colorado. The MWX project drilled three closely-spaced wells (MWX-1, MWX-2 and MWX-3) which were the basis for extensive reservoir analyses and tight gas sand characterizations in the blanket and lenticular sandstone bodies of the Mesaverde Group. The research results and background knowledge gained from the MWX project are directly applicable to research in the current M-Site Project.

Wilmer, R. [CER Corp., Las Vegas, NV (United States); Warpinski, N.R. [Sandia National Laboratories (United States); Wright, T.B. [Resources Engineering Systems (United States); Branagan, P.T. [Branagan & Associates (United States); Fix, J.E. [Fix & Associates (United States)

1995-06-01T23:59:59.000Z

435

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems … Projected Performance and Cost Parameters  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen and Fuel Cells Program Record DOE Hydrogen and Fuel Cells Program Record Record #: 9017 Date: July 02, 2010 Title: On-Board Hydrogen Storage Systems - Projected Performance and Cost Parameters Originators: Robert C. Bowman and Ned Stetson Approved by: Sunita Satyapal Date: August 10, 2010 This record summarizes the current technical assessments of hydrogen (H 2 ) storage system capacities and projected manufacturing costs for the scenario of high-volume production (i.e., 500,000 units/year) for various types of "on-board" vehicular storage systems. These analyses were performed within the Hydrogen Storage sub-program of the DOE Fuel Cell Technologies (FCT) program of the Office of Energy Efficiency and Renewable Energy. Item: It is important to note that all system capacities are "net useable capacities" able to be delivered to the

436

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

437

PROJECTS FROM FEDERAL REGION IX DOE APPROPRIATE ENERGY TECHNOLOGY PILOT PROGRAM - PART I  

E-Print Network (OSTI)

alternative energy educational program, Project SAW: Solar -Solar Energy Research Commission are interested in the program. Projectsolar energy. Award: Pro ect Term: ect Descr 14 months (Project

Case, C.W.

2011-01-01T23:59:59.000Z

438

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

439

Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 7, 2004 April 7, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the coho acclimation research task would be modified to include a new site located in the upper Yakima south of Cle Elum, WA. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Yakima Fisheries Project Final Environmental Impact Statement (YFP EIS)

440

DOE/RMOTC/05.98001 Hydro-Balanced Stuffing Box Field Test Field Test Project Report  

NLE Websites -- All DOE Office Websites (Extended Search)

RMOTC/05.98001 RMOTC/05.98001 Hydro-Balanced Stuffing Box Field Test Field Test Project Report Date Published: May 28, 1999 Leo A. Giangiacomo, P.E. Rocky Mountain Oilfield Testing Center 907 N. Poplar, Suite 150 Casper, WY 82601 Distribution A. Approved for public release; Further dissemination unlimited. (Unclassified Unlimited) DOE/RMOTC/05.98001 Hydro-Balanced Stuffing Box Field Test Test Project Report Test Project Report Test Project Report Test Project Report Date Published: May 28, 1999 Leo A. Giangiacomo, P.E. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY ROCKY MOUNTAIN OILFIELD TESTING CENTER 907 N. Poplar, Suite 150 Casper, WY 82601 Work Performed Under RMOTC ERIP Funding Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Finding of No Significant Impact for the Veritas 3D Seismic Project (DOE/EA-1544) (7/25/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Government Department of Energy memorandum DATE : July 25, 2005 REPLY TO ATTN OF : FE-472 (Michael J. Taylor) Serial No:MJT/04.082 SUBJECT : FONSI for Veritas 3D Seismic Project (DOE/EA-1544) TO : File INTRODUCTION : Veritas DGC Land Inc. (Veritas) has notified the Department of Energy (DOE) through the Rocky Mountain Oilfield Testing Center (RMOTC) of their intent to conduct a 3D Vibroseis acquisition project in Natrona County, Wyoming. The proposed property is contained in Sections 20, 21, 22, 28, and 28 of T 39 N, R 78 W, at Naval Petroleum Reserve No. 3 (NPR-3). Veritas is the seismic contractor for the Salt Creek 3D Project. A verbal Notice of Intent (NOI) to Conduct Oil and Gas

442

Midwest Regional Carbon Sequestration Partnership Update (DOE Project No. DE-FC26-05NT42589)  

NLE Websites -- All DOE Office Websites (Extended Search)

Neeraj Gupta, Technical Director Neeraj Gupta, Technical Director Darrell Paul, Program Manager Battelle, Columbus, OH Midwest Regional Carbon Sequestration Partnership Update (DOE Project No. DE-FC26-05NT42589) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline Quick Overview of MRSCP MRCSP Benefit to the DOE Program MRCSP Project Overview: Goals and Objectives Technical Status Accomplishments to Date Summary Appendix Organization Chart Bibliography 3 About the Midwest Regional Carbon Sequestration Partnership * Formed in 2003 as a public/private consortium * Consists of nearly 40 members, led by Battelle

443

DOE-Funded Research Projects Win 46 R&D 100 Awards for 2009 ...  

Office of Science (SC) Website

and engineers from 12 of the 17 DOE National Laboratories as well as the Nevada Test Site received awards. Since 1962, when R&D Magazine's annual competition began, DOE has...

444

DOE Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop  

Energy.gov (U.S. Department of Energy (DOE))

Presented by the Tribal Energy Program and the U.S. Department of Energy (DOE) Office of Indian Energy with support from DOE's National Renewable Energy Laboratory, this interactive workshop will...

445

Novel Lithium Ion Anode Structures: Overview of New DOE BATT Anode Projects  

Energy.gov (U.S. Department of Energy (DOE))

2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

446

DOE Zero Energy Ready Home Case Study: Shore Road Project- Old Greenwich, Connecticut  

Energy.gov (U.S. Department of Energy (DOE))

This case study describes the builder Murphy Brothers' first DOE Zero Energy Ready Home in Old Greenwich, CT.

447

Solid-State Lighting Patents Resulting from DOE-Funded Projects  

Energy.gov (U.S. Department of Energy (DOE))

Lists the primary research organizations and patent applications both submitted to and granted by DOE. (January 2015)

448

Final Report for DOE grant project FG02-07ER41458 [Dense Quark Matter in Magnetic Fields  

SciTech Connect

Final Report for DOE grant DE-FG02-07ER41458. This grant was originally a three-year project. However, this final report summarizes the results of the first two years, as at the end of the second year of the grant the PIs moved to a new university and the grant was closed. The work done under the first two years of the DOE grant led to several papers and presentations. It also served to train one undergraduate and three graduate students.

Incera, Vivian

2012-01-24T23:59:59.000Z

449

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

450

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

451

Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05) 9/20/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 20, 2002 September 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the domestication selection research task would be modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration is funding ongoing studies, research, and artificial production of

452

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

453

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

454

Final Report on DOE Project entitled Dynamic Optimized Advanced Scheduling of Bandwidth Demands for Large-Scale Science Applications  

SciTech Connect

In this project, developed scheduling frameworks for dynamic bandwidth demands for large-scale science applications. In particular, we developed scheduling algorithms for dynamic bandwidth demands in this project. Apart from theoretical approaches such as Integer Linear Programming, Tabu Search and Genetic Algorithm heuristics, we have utilized practical data from ESnet OSCARS project (from our DOE lab partners) to conduct realistic simulations of our approaches. We have disseminated our work through conference paper presentations and journal papers and a book chapter. In this project we addressed the problem of scheduling of lightpaths over optical wavelength division multiplexed (WDM) networks. We published several conference papers and journal papers on this topic. We also addressed the problems of joint allocation of computing, storage and networking resources in Grid/Cloud networks and proposed energy-efficient mechanisms for operatin optical WDM networks.

Ramamurthy, Byravamurthy [University of Nebraska-Lincoln

2014-05-05T23:59:59.000Z

455

Does it have to be so complicated? : municipal renewable energy projects in Massachusetts  

E-Print Network (OSTI)

This thesis examines municipal implementation of renewable energy projects in Massachusetts. It explores projects that have been planned and completed, drivers for municipal adoption of renewable energy, the implementation ...

Riberio, Lori A. (Lori Ann)

2006-01-01T23:59:59.000Z

456

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Catalyst Process Kinetic Data - Pres. 1: Coordination of CLEERS Project; Pres. 2: ORNL Research on LNT Sulfation & Desulfation CLEERS Coordination & Development of...

457

DOE/EIS-0289, Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project (June 1, 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA June 2000 U.S. DEPARTMENT OF ENERGY COVER SHEET June 2000 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this final environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@netl.doe.gov.

458

DOE/EIS-0289; Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project, August 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA August 1999 U.S. DEPARTMENT OF ENERGY COVER SHEET August 1999 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, Federal Energy Technology Center, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@fetc.doe.gov.

459

Record of Decision for the Electrical Interconnection of Goldendale Energy Project (DOE/EIS-0183) (03/20/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Record of Decision for the Electrical Record of Decision for the Electrical Interconnection of Goldendale Energy Project SUMMARY Bonneville Power Administration (BPA) has decided to offer terms for integrating power from the Goldendale Energy Project (GEP) into the Federal Columbia River Transmission System (FCRTS). BPA will offer contracts integrating power from GEP into the FCRTS for delivery to the wholesale power market. In reaching this decision, I have considered the potential environmental impacts addressed in BPA's Business Plan Environmental Impact Statement (BP EIS, DOE/EIS-0183) and a Supplement Analysis (DOE/EIS-0183/SA-03). I have also considered input from the public process for the GEP. BPA will distribute this Record of Decision (ROD) to all known interested and affected persons, Tribes, and agencies and will publish a notice of its availability in the

460

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

Note: This page contains sample records for the topic "doe project coordinator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOE/EA-1584: Final Environmental Assessment for Sand Point Wind Installation Project, Sand Point, Alaska (September 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sand Point Wind Installation Project Sand Point, Alaska DOE/EA -1584 U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 September 2009 TABLE OF CONTENTS Page 1.0 INTRODUCTION .............................................................................................................. 1 1.1 NATIONAL ENVIRONMENTAL POLICY ACT AND RELATED PROCEDURES....................................................................................................... 1 1.2 BACKGROUND .................................................................................................... 1 1.3 PURPOSE AND NEED.......................................................................................... 2 1.4 PUBLIC SCOPING AND CONSULTATION.......................................................

462

DOE/EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota (April 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL IMPACT STATEMENT Deer Creek Station Energy Facility Project Brookings County, South Dakota U.S. Department of Energy Western Area Power Administration Upper Great Plains Region Billings, Montana DOE/EIS-0415 April 2010 Final Environmental Impact Statement Cover Sheet i COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agency: U.S. Department of Agriculture, Rural Utilities Service

463

Fermilab | Directorate | Office of Project Management Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE links DOE Office of Project Assessment (SC-28) DOE Office of Project Assessment Project Management Processes and Procedures DOE Directives Home Page DOE Policies, Orders...

464

DOE Solar Decathlon: Kansas Project Solar House: Getting From Here to There  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas Project Solar House taken during the U.S. Department of Energy Solar Decathlon 2007. Kansas Project Solar House taken during the U.S. Department of Energy Solar Decathlon 2007. Enlarge image The Kansas Project Solar House incorporated a translucent polycarbonate north wall for daylighting and reclaimed barn wood for exterior screening. (Credit: Jim Tetro/U.S. Department of Energy) Who: Kansas State University and the University of Kansas What: Kansas Project Solar House Where: SunEdison Alamosa Solar Plant 8900 Lane 8 North Mosca, CO 81146 Map This House Public tours: Not available Solar Decathlon 2007 Kansas Project Solar House: Getting From Here to There Following the U.S. Department of Energy Solar Decathlon 2007, Kansas State University and the University of Kansas sold the Kansas Project Solar House to SunEdison-the largest solar energy services provider in North America.

465

EVALUATION OF THOR MINERALIZED WASTE FORMS FOR THE DOE ADVANCED REMEDIATION TECHNOLOGIES PHASE 2 PROJECT  

SciTech Connect

The U.S. Department of Energy's (DOE) Office of River Protection (ORP) is responsible for the retrieval, treatment, immobilization, and disposal of Hanford's tank waste. Currently there are approximately 56 million gallons of highly radioactive mixed wastes awaiting treatment. A key aspect of the River Protection Project (RPP) cleanup mission is to construct and operate the Waste Treatment and Immobilization Plant (WTP). The WTP will separate the tank waste into high-level and low-activity waste (LAW) fractions, both of which will subsequently be vitrified. The projected throughput capacity of the WTP LAW Vitrification Facility is insufficient to complete the RPP mission in the time frame required by the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement (TPA), i.e. December 31, 2047. Therefore, Supplemental Treatment is required both to meet the TPA treatment requirements as well as to more cost effectively complete the tank waste treatment mission. The Supplemental Treatment chosen will immobilize that portion of the retrieved LAW that is not sent to the WTP's LAW Vitrification facility into a solidified waste form. The solidified waste will then be disposed on the Hanford site in the Integrated Disposal Facility (IDF). In addition, the WTP LAW Vitrification facility off-gas condensate known as WTP Secondary Waste (WTP-SW) will be generated and enriched in volatile components such as Cs-137, I-129, Tc-99, Cl, F, and SO{sub 4} that volatilize at the vitrification temperature of 1150 C in the absence of a continuous cold cap. The current waste disposal path for the WTP-SW is to recycle it to the supplemental LAW treatment to avoid a large steady state accumulation in the pretreatment-vitrification loop. Fluidized Bed Steam Reforming (FBSR) offers a moderate temperature (700-750 C) continuous method by which LAW and/or WTP-SW wastes can be processed irrespective of whether they contain organics, nitrates, sulfates/sulfides, chlorides, fluorides, volatile radionuclides or other aqueous components. The FBSR technology can process these wastes into a crystalline ceramic (mineral) waste form. The mineral waste form that is produced by co-processing waste with kaolin clay in an FBSR process has been shown to be as durable as LAW glass. Monolithing of the granular FBSR product, which is one of the objectives of this current study, is being investigated to prevent dispersion during transport or burial/storage but is not necessary for performance. FBSR testing of a Hanford LAW simulant and a WTP-SW simulant at the pilot scale was performed by THOR Treatment Technologies, LLC at Hazen Research Inc. in April/May 2008. The Hanford LAW simulant was the Rassat 68 tank blend and the target concentrations for the LAW was increased by a factor of 10 for Sb, As, Ag, Cd, and Tl; 100 for Ba and Re (Tc surrogate); 1,000 for I; and 254,902 for Cs based on discussions with the DOE field office and the environmental regulators and an evaluation of the Hanford Tank Waste Envelopes A, B, and C. It was determined through the evaluation of the actual tank waste metals concentrations that some metal levels were not sufficient to achieve reliable detection in the off-gas sampling. Therefore, the identified metals concentrations were increased in the Rassat simulant processed by TTT at HRI to ensure detection and enable calculation of system removal efficiencies, product retention efficiencies, and mass balance closure without regard to potential results of those determinations or impacts on product durability response such as Toxicity Characteristic Leach Procedure (TCLP). A WTP-SW simulant based on melter off-gas analyses from Vitreous State Laboratory (VSL) was also tested at HRI in the 15-inch diameter Engineering Scale Test Demonstration (ESTD) dual reformer at HRI in 2008. The target concentrations for the Resource Conservation and Recovery Act (RCRA) metals were increased by 16X for Se, 29X for Tl, 42X for Ba, 48X for Sb, by 100X for Pb and Ni, 1000X for Ag, and 1297X for Cd to ensure detection by the an

Crawford, C.; Jantzen, C.

2012-02-02T23:59:59.000Z

466

DOE/EIS-0294; Sutter Power Project Final Environmental Impact Statement, Volume I (April 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COVER SHEET COVER SHEET Project Title: Sutter Power Project, Final Environmental Impact Statement Sutter County, California Federal Lead Agency: Western Area Power Administration, U.S. Department of Energy Related Actions: California Energy Commission's Certification for the Sutter Power Project Calpine Corporation's Application for Certification for the Sutter Power Project Sutter County General Plan Amendment and a Planned Development Rezone Western's Sutter Powerplant -- Interconnection Feasibility Study Technical Assistance: Foster Wheeler Environmental Corporation CH2M Hill R. W. Beck ABSTRACT Western Area Power Administration operates and maintains a high-voltage electric transmission system in California to deliver power to qualified customers. Calpine Corporation has requested that Western study

467

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

468

DOE Announces up to $29.3 Million in Projects for Research, Developmen...  

Office of Environmental Management (EM)

These projects were selected to accelerate the development of thermoelectric (TE) systems that provides the heating, ventilation, and air conditioning (HVAC) in vehicles. The...

469

DOE Fuel Cell Technologies Office Record 13013: H2 Delivery Cost Projections 2013  

Energy.gov (U.S. Department of Energy (DOE))

This program record from the U.S. Department of Energy's Fuel Cell Technologies Office provides information about past, current, and projected costs for delivering and dispensing hydrogen.

470