National Library of Energy BETA

Sample records for doe paducah site

  1. Paducah DOE and Site Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Background » Paducah DOE and Site Contractors Paducah DOE and Site Contractors DOE office at the Paducah Site DOE office at the Paducah Site DOE Paducah DOE's responsibilities at the site have evolved over time from producing enriched uranium to environmental remediation. DOE will continue to manage the cleanup activities at the site until completion. The Portsmouth/Paducah Project Office (PPPO) was established by the DOE Office of Environmental Management (EM) to provide leadership and

  2. Senior DOE Officials Visit Paducah Gaseous Diffusion Plant Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Senior DOE Officials Visit Paducah Gaseous Diffusion Plant Site Senior DOE Officials Visit Paducah Gaseous Diffusion Plant Site April 29, 2015 - 12:00pm Addthis EM Paducah site lead Jennifer Woodard discusses electrical resistance heating as part of the trichloroethene remediation at the C-400 groundwater contamination source with David Klaus, DOE Deputy Under Secretary for Management and Performance (right). EM Paducah site lead Jennifer Woodard discusses electrical

  3. DOE's Top Environmental Cleanup Official Visits Paducah Site | Department

    Office of Environmental Management (EM)

    of Energy DOE's Top Environmental Cleanup Official Visits Paducah Site DOE's Top Environmental Cleanup Official Visits Paducah Site April 26, 2012 - 2:00pm Addthis DOE-EM Senior Advisor Dave Huizenga, right, and DOE Paducah Site Lead Reinhard Knerr look at a three-dimensional model of the Paducah Site’s groundwater system. University of Kentucky College of Design students assembled the model for the Paducah Citizens Advisory Board. The model was displayed at the Site-Specific Advisory

  4. Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site |

    Office of Environmental Management (EM)

    Department of Energy Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site October 26, 2011 - 8:14am Addthis Brandon Henderson checks a pump in the water treatment facility at the Paducah Gaseous Diffusion Plant. The former Recovery Act engineer now works for the U.S. Enrichment Corp. Brandon Henderson checks a pump in the water treatment facility at the Paducah Gaseous Diffusion Plant. The former Recovery

  5. Warehouse Cleanup Project Completed at DOE's Paducah Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Warehouse Cleanup Project Completed at DOE's Paducah Site Warehouse Cleanup Project Completed at DOE's Paducah Site January 27, 2015 - 3:06pm Addthis Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) A crane loads a high‐side railcar for transport to a commercial waste disposal facility after

  6. Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site |

    Energy Savers [EERE]

    Department of Energy Investment Accelerates Cleanup Work at DOE's Paducah Site Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site July 15, 2011 - 12:00pm Addthis UF6 piping deactivation The black inlet hose is attached to a negative air machine that allows Feed Plant cleanup workers to safely deactivate uranium hexafluoride (UF6) piping, seen at right of the lift supporting the crew. UF6 piping deactivation The black inlet hose is attached to a negative air machine that

  7. DOE Paducah Site Tour - Industry Workshop, July 31, 2012 | Department of

    Energy Savers [EERE]

    Energy Paducah Site Tour - Industry Workshop, July 31, 2012 DOE Paducah Site Tour - Industry Workshop, July 31, 2012 Paducah Site Tour Paducah Site Tour booklet for the two-day workshop for industry representatives held on PGDP assets and future use for the site on July 31 and August 1, 2012. DOE communicated with prospective businesses that may be interested in either the operation of the PGDP as a uranium enrichment facility or have an interest in reindustrialization of various plant

  8. Paducah Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Site Paducah Site Paducah Gaseous Diffusion Plant Paducah Gaseous Diffusion Plant Productive reuse opportunities are being explored as the U.S. Department of Energy cleans up the 3,556-acre Paducah Gaseous Diffusion Plant site. Read more Paducah Citizens Advisory Board Paducah Citizens Advisory Board The Paducah Citizens Advisory Board works with the Department of Energy to make recommendations that reflect the community's concerns. Read more Paducah Environmental Remediation Paducah

  9. Paducah Site Description | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Background » Paducah Site Description Paducah Site Description The 3,556-acre Paducah Site is located in western Kentucky The 3,556-acre Paducah Site is located in western Kentucky Paducah state Map The Paducah Gaseous Diffusion (PGDP) Site is located in McCracken County, Kentucky, 10 miles west of the city of Paducah. The plant is located on a 3,556-acre DOE site, of which approximately 750 acres are within the fenced security area. The PGDP footprint has more than 500 facilities, 19 miles of

  10. Paducah Site Future Use | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Future Use Paducah Site Future Use Paducah C-333 Process Building Paducah C-333 Process Building DOE has been actively pursuing the environmental cleanup goals at the Paducah site since 1988. After environmental cleanup activities are completed, the sites will be available for reuse with a range of uses up to and including heavy industry. Mission & End State Today, DOE's site missions include environmental cleanup, waste disposition, depleted uranium conversion, decontamination and

  11. New Signs Direct Recreational Use of Land at DOE's Paducah Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Signs Direct Recreational Use of Land at DOE's Paducah Site New Signs Direct Recreational Use of Land at DOE's Paducah Site June 19, 2012 - 9:43am Addthis A black Lab awaits his handler’s signal to retrieve a duck during field trials in late March in the West Kentucky Wildlife Management Area. A black Lab awaits his handler's signal to retrieve a duck during field trials in late March in the West Kentucky Wildlife Management Area. A yellow Labrador retriever carries

  12. DOE Releases '2015 Year in Review' of Paducah Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Paducah Site DOE Releases '2015 Year in Review' of Paducah Site December 30, 2015 - 11:30am Addthis An excavator with a shear attachment performs “top-down” shearing during final stages of the demolition of the C-410/C-420 UF6 Feed Plant Complex in June. Demolition debris was downsized and loaded into rail cars for shipment off site. The complex was the last of 32 inactive facilities to be removed as part of the cleanup scope that existed before commercial uranium enrichment

  13. Community College Highlights Paducah Site Groundwater Model | Department of

    Office of Environmental Management (EM)

    Energy College Highlights Paducah Site Groundwater Model Community College Highlights Paducah Site Groundwater Model May 8, 2013 - 12:00pm Addthis Steve Hampson of the University of Kentucky, left to right, West Kentucky Community & Technical College President Dr. Barbara Veazey, Paducah Junior College Board of Trustees member Ken Wheeler and Buz Smith of the DOE Paducah Site Office examine a DOE Paducah Site groundwater model exhibit at the West Kentucky Community & Technical

  14. Paducah Site Regulatory Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Documents Paducah Site Regulatory Documents PDF icon Paducah Site Federal Facility Agreement PDF icon Paducah 2015 Site Management Plan PDF icon Paducah Community Relations Plan R8 - 2013 PDF icon Paducah Site End State Vision - 2008 More Documents & Publications Paducah Site Management Plan

  15. DOE - Office of Legacy Management -- Paducah Gaseous Diffusion Plant - KY

    Office of Legacy Management (LM)

    01 Paducah Gaseous Diffusion Plant - KY 01 FUSRAP Considered Sites Site: Paducah Gaseous Diffusion Plant (KY.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.oakridge.doe.gov/factsheets/paducgdp.htm Documents Related to Paducah Gaseous Diffusion Plant

  16. Microsoft PowerPoint - DOE Paducah Site Tour Industry Day - 2012-07-31

    Office of Environmental Management (EM)

    Paducah Site Tour Paducah Gaseous Diffusion Plant (PGDP) Industry Workshop July 31, 2012 Site History/Key Facts In 1950, the Atomic Energy Commission selected the former Kentucky Ordnance Works site for the second of three planned uranium enrichment plants. Construction began in 1951. The first product was shipped in 1952. Placing a converter in an enrichment cell during plant construction. 1 Site History/Key Facts * Uranium was enriched for nuclear weapons until the mid-1960s when the plant

  17. Seismically-induced soil amplification at the DOE Paducah Gaseous Diffusion Plant site

    SciTech Connect (OSTI)

    Sykora, D.W.; Haynes, M.E. . Geotechnical Lab.); Brock, W.R.; Hunt, R.J.; Shaffer, K.E. )

    1991-01-01

    A site-specific earthquake site response (soil amplification) study is being conducted for the Department of Energy (DOE), Paducah Gaseous Diffusion Plant (PGDP). This study is pursuant to an upgraded Final Safety Analysis Report in accordance with requirements specified by DOE. The seismic hazard at PGDP is dominated by the New Madrid Seismic Zone. Site-specific synthetic earthquake records developed by others were applied independently to four soil columns with heights above baserock of about 325 ft. The results for the 1000-year earthquake event indicate that the site period is between 1.0 and 1.5 sec. Incident shear waves are amplified at periods of motion greater than 0.15 sec. The peak free-field horizontal acceleration, occurring at very low periods, is 0.28 g. 13 refs., 13 figs.

  18. Paducah Site Historical Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Background Paducah Site Historical Timeline Paducah Site Historical Timeline This site works best with JavaScript Enabled (click to enlarge)...

  19. Independent Oversight Review, Paducah Site - April 2013 | Department of

    Office of Environmental Management (EM)

    Energy Paducah Site - April 2013 Independent Oversight Review, Paducah Site - April 2013 April 2013 Review of Preparedness for Severe Natural Phenomena Events at the Paducah Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Paducah site's preparedness for severe natural phenomena events (NPEs). The HSS Office of Safety and Emergency Management

  20. EM's Paducah Site Completes Building Removals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM's Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals Addthis

  1. Energy Department Selects New Paducah Site Lead | Department of Energy

    Energy Savers [EERE]

    New Paducah Site Lead Energy Department Selects New Paducah Site Lead May 30, 2014 - 10:30am Addthis PADUCAH, Kentucky - The Department of Energy (DOE) Portsmouth Paducah Project Office (PPPO) is pleased to announce the selection of Mrs. Jennifer Woodard as the new Paducah Site Lead. Mrs. Woodard has over 20 years of experience in engineering and program/project management with the U.S. Department of Energy (DOE) and as a DOE contractor. Mrs. Woodard has a diverse background that includes

  2. DOE Dunking Booth Helps Paducah Charities

    Broader source: Energy.gov [DOE]

    PADUCAH, KY – The Department of Energy (DOE) and its Paducah contractors have raised nearly $1,100 to help restock the shelves of six Paducah service organizations that help the hungry.

  3. Paducah Site Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Plan Paducah Site Management Plan The annual Paducah Gaseous Diffusion Plant Site Management Plan (SMP) outlines DOE's strategic approach for achieving cleanup under the Federal Facility Agreement. The purpose of the SMP is to coordinate and document the potential and selected operable units, including removal actions; to define cleanup priorities; to identify work activities that will serve as the basis for enforceable timetables and deadlines under the agreement; and to establish

  4. 240 Jobs Later: The Recovery Act's Impact at the Paducah Site |

    Office of Environmental Management (EM)

    Department of Energy 0 Jobs Later: The Recovery Act's Impact at the Paducah Site 240 Jobs Later: The Recovery Act's Impact at the Paducah Site February 7, 2011 - 3:18pm Addthis Mechanics train with plasma arc cutting equipment at the Paducah Site | Courtesy of Paducah Gaseous Diffusion Plant Mechanics train with plasma arc cutting equipment at the Paducah Site | Courtesy of Paducah Gaseous Diffusion Plant Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs What does

  5. Workers Demolish Metals Plant at Paducah Site

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – EM cleanup efforts at the Paducah site progressed this month with the demolition of one of the site’s most contaminated structures.

  6. Paducah Site Annual Site Environmental Report PAD-REG-1021

    Energy Savers [EERE]

    Paducah Site Annual Site Environmental Report PAD-REG-1021 This report is intended to fulfill the requirements of U.S. Department of Energy Order (DOE) 231.1B. The data and information contained in this report were collected in accordance with the Paducah Site Environmental Monitoring Plan (LATA Kentucky 2012; LATA Kentucky 2013a) approved by DOE. This report is not intended to provide the results of all sampling conducted at the Paducah Site. Additional data collected for other site purposes,

  7. DOE Releases Request for Information for Paducah Gaseous Diffusion...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information for Paducah Gaseous Diffusion Plant Deactivation & Remediation Services DOE Releases Request for Information for Paducah Gaseous Diffusion Plant Deactivation &...

  8. Paducah Community Chronicles Site History in New Book

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Members of the Paducah Citizens Advisory Board (CAB) spearheaded the publication of a new book that captures the history of EM’s Paducah site.

  9. Reconfiguration of Paducah Site's Electrical Distribution Provides...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PADUCAH, Ky. - While EM's Paducah Site is preparing its gaseous diffusion plant (GDP) ... Currently, electricity consumption at the site is only about 0.5 percent of what was used ...

  10. Preparation Helps Paducah Site Weather Tornado

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Emergency management is a systematic, integrated effort at the Paducah Gaseous Diffusion Plant (PGDP) site, a sprawling complex with more than 500 facilities and multiple work organizations.

  11. Paducah Site 1997 annual environmental report

    SciTech Connect (OSTI)

    1998-12-01

    The Paducah Gaseous Diffusion Plant, located in McCracken County, Kentucky, has been producing enriched uranium since 1952. In July 1993, the US Department of Energy (DOE) leased the production areas of the site to the US Enrichment Corporation (USEC). A subsidiary of Lockheed Martin Corporation, Lockheed Martin Utility Services, manages the leased facilities for USEC. The DOE maintains responsibility for the environmental restoration, waste management, and depleted uranium hexafluoride cylinder program activities at the plant through its management contractor. The purpose of this document is to summarize calendar year 1997 environmental monitoring activities for DOE activities at the Paducah Site managed by Lockheed Martin Energy Systems. The DOE requires all of its facilities to conduct and document such activities annually. This report does not include USEC environmental activities.

  12. Paducah site annual environmental for 1996

    SciTech Connect (OSTI)

    Belcher, G.

    1997-12-01

    The Paducah Gaseous Diffusion Plant, located in McCracken County, Kentucky, has been producing enriched uranium since 1952. In July 1993, the US Department of Energy (DOE) leased the production areas of the site to the United States Enrichment Corporation (USEC). A subsidiary of Lockheed Martin Corporation, Lockheed Martin Utility Services, manages the leased facilities for USEC. The DOE maintains responsibility for the environmental restoration, waste management, and depleted uranium hexafluoride cylinder program activities at the plant through its management contractor, Lockheed Martin Energy Systems. The purpose of this document is to summarize calendar year 1996 environmental monitoring activities for DOE activities at the Paducah Site. The DOE requires all of its facilities to conduct and document such activities annually. This report does not include USEC environmental activities.

  13. Paducah Site annual report for 1995

    SciTech Connect (OSTI)

    Belcher, G.

    1997-01-01

    The Paducah Gaseous Diffusion Plant, located in McCracken County, Kentucky, has been producing enriched uranium since 1952. In July 1993, the US department of Energy (DOE) leased the production areas of the site to the US Enrichment Corporation (USEC). A new subsidiary of Lockheed Martin Corporation, Lockheed Martin Utility Services, manages the leased facilities for USEC. DOE maintains responsibility for the environmental restoration, waste management, and enrichment facilities activities at the plant through its management contractor, Lockheed Martin Energy Systems. The purpose of this document is to summarize calendar year 1995 environmental monitoring activities for DOE activities at the Paducah Site. DOE requires all of its facilities to conduct and document such activities annually. This report does not include USEC environmental activities.

  14. Reconfiguration of Paducah Site's Electrical Distribution Provides

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency and Savings | Department of Energy Reconfiguration of Paducah Site's Electrical Distribution Provides Efficiency and Savings Reconfiguration of Paducah Site's Electrical Distribution Provides Efficiency and Savings September 24, 2015 - 12:15pm Addthis Electricians prepare to attach a new power cable to a transformer located inside the former Paducah Gaseous Diffusion Plant. Electricians prepare to attach a new power cable to a transformer located inside the former Paducah Gaseous

  15. Paducah Events | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Site » Paducah Community Outreach » Paducah Events Paducah Events January 2016 < prev next > Sun Mon Tue Wed Thu Fri Sat 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Paducah Citizens Advisory Board Meeting - January 6:00PM to 8:00PM CST 24 25 26 27 28 29 30 31 1 2 3 4 5 6 Paducah Site Background Paducah Site Description Paducah DOE & Site Contractors Paducah Environmental Remediation Paducah Regulatory Approach Paducah Cleanup Scope Paducah Waste

  16. FTCP Site Specific Information - Portsmouth Paducah Project Office |

    Office of Environmental Management (EM)

    Department of Energy Portsmouth Paducah Project Office FTCP Site Specific Information - Portsmouth Paducah Project Office FTCP Agent Organization Name Phone E-Mail PPPO Robert Edwards 859-219-4002 robert.edwards@lex.doe.gov Annual Workforce Analysis and Staffing Plan Reports Calendar Year 2015 Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010

  17. Paducah Annual Site Environmental Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Site Environmental Reports Paducah Annual Site Environmental Reports The purpose of this Annual Site Environmental Report is to summarize calendar year environmental management activities at the Paducah Site, including effluent monitoring, environmental surveillance, and environmental compliance status and to highlight significant site program efforts. Annually, DOE implements programs to measure any impacts that its operations have on the environment or the public. Surveillance under

  18. NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office ACTION: Finding of No Significant Impact (FONSI); Paducah Gaseous Diffusion Plant Environmental Assessment (EA) for Potential Land and Facilities Transfers, McCracken County, Kentucky DATE: l)SUMMARY: The Proposed Action is to transfer DOE real property at the Paducah Gaseous Diffusion Plant (PGDP) site to one or more entities for a use that is different from its current use. DOE's Paducah Gaseous Diffusion Plant

  19. NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office

    Office of Environmental Management (EM)

    NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office ACTION: Finding of No Significant Impact (FONSI); Paducah Gaseous Diffusion Plant Environmental Assessment (EA) for Potential Land and Facilities Transfers, McCracken County, Kentucky DATE: l)SUMMARY: The Proposed Action is to transfer DOE real property at the Paducah Gaseous Diffusion Plant (PGDP) site to one or more entities for a use that is different from its current use. DOE's Paducah Gaseous Diffusion Plant

  20. EM's Paducah Site Brings Environmental Data to Public on Web...

    Office of Environmental Management (EM)

    EM's Paducah Site Brings Environmental Data to Public on Web EM's Paducah Site Brings Environmental Data to Public on Web December 3, 2012 - 12:00pm Addthis EMs Paducah site ...

  1. Paducah WDA Site Selection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Selection Paducah WDA Site Selection Five site meet criteria for further consideration Five site meet criteria for further consideration Proposed Sites: Initially, sites were identified that offered the available area required to contain the estimated waste. Twelve sites were identified. After screening criteria were applied, five sites met the Threshold Criteria. Paducah WDA threshold Criteria Considerations included: Wetlands, Power Lines, Land Use, Site Contamination, Tpographical

  2. Paducah Site Hosts Governor’s Scholars Visit

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Nineteen of Kentucky’s brightest teenagers visited the Paducah site this summer to learn more about environmental cleanup and waste management.

  3. Cleanup Contractor at Paducah Site Receives Performance Excellence Award

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – The environmental cleanup contractor at EM’s Paducah site has been honored for demonstrating serious commitment to performance improvement principles.

  4. Students Imagine Paducah Site as Technical, Industrial Hub

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – University of Kentucky (UK) College of Design students envision the Paducah site as a thriving, multiple-use area in the future.

  5. DOE Workshop Gauges Paducah Plant Interest | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Workshop Gauges Paducah Plant Interest DOE Workshop Gauges Paducah Plant Interest August 1, 2012 - 9:35am Addthis PADUCAH, KY - The U.S. Departmentof Energy's Portsmouth/Paducah Project Office (PPPO) is completing a two-day Industry Interest Workshop today at the Julian Carroll Convention Center. The United States Enrichment Corporation (USEC) currently leases the Paducah Gaseous Diffusion Plant from DOE to enrich uranium. USEC may return most or all of the plant to DOE and terminate the

  6. Paducah Wall Display Unveiled at DOE Headquarters

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C.—Secretary of Energy Dr. Ernest Moniz joined Congressional, DOE, state and local leaders and representatives of the Paducah Area Chamber of Commerce September 10, 2015 to cut the...

  7. Paducah Site | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The Paducah Gaseous Diffusion Plant (PGDP) was constructed in 1952 to produce enriched uranium, initially for the nation's nuclear weapons program and later for nuclear fuel for ...

  8. Paducah Citizens Advisory Board | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community Outreach » Paducah Citizens Advisory Board Paducah Citizens Advisory Board Paducah Citizens Advisory Board Meeting Paducah Citizens Advisory Board Meeting The Paducah Citizens Advisory Board (CAB) provides informed, independent advice and recommendations to DOE regarding environmental restoration, waste management, future land use, risk assessment, clean-up technologies, and related Paducah Site activities. The CAB is a nonpartisan, representative organization consisting of members

  9. DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant |

    Office of Environmental Management (EM)

    Department of Energy DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion Plant August 9, 2013 - 5:30pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Task Proposal (RTP) for deactivation activities at the Paducah Gaseous Diffusion Plant (GDP) in Paducah, Kentucky. These services are required so that DOE can address

  10. Workers Demolishing Significant Inactive Facility at Paducah Site

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Heavy equipment operators are demolishing the last of 32 inactive facilities scheduled to be removed as part of the current cleanup scope at EM’s Paducah Site.

  11. Analytical Laboratory Reopens at Paducah Site | Department of Energy

    Energy Savers [EERE]

    Analytical Laboratory Reopens at Paducah Site Analytical Laboratory Reopens at Paducah Site June 30, 2015 - 12:00pm Addthis Sara Ledgerwood and Cindy Schneider, FPDP scientists, use advanced equipment to analyze and characterize samples from the project for metals concentration. Sara Ledgerwood and Cindy Schneider, FPDP scientists, use advanced equipment to analyze and characterize samples from the project for metals concentration. PADUCAH, Ky. - The Analytical Laboratory at EM's Paducah Gaseous

  12. Annual Site Environmental Report Paducah Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report Paducah Site 2011 PAD-REG-1012 BACK TABLE OF CONTENTS FORWARD Fractions and Multiples of Units Multiple Decimal Equivalent Prefix Symbol Engineering Format 10 6 1,000,000 mega- M E+06 10 3 1,000 kilo- k E+03 10 2 100 hecto- h E+02 10 10 deka- da E+01 10 -1 0.1 deci- d E-01 10 -2 0.01 centi- c E-02 10 -3 0.001 milli- m E-03 10 -6 0.000001 micro- μ E-06 10 -9 0.000000001 nano- n E-09 10 -12 0.000000000001 pico- P E-12 10 -15 0.000000000000001 femto- F E-15 10 -18 0.000000000000000001 atto-

  13. Paducah Site Federal Facility Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Facility Agreement Paducah Site Federal Facility Agreement The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised Statute 224; and other laws and regulations identified in the FFA. PDF icon

  14. Paducah Site Modernizes Equipment to Treat Off-Site Groundwater

    Energy Savers [EERE]

    Contamination | Department of Energy Paducah Site Modernizes Equipment to Treat Off-Site Groundwater Contamination Paducah Site Modernizes Equipment to Treat Off-Site Groundwater Contamination February 25, 2016 - 12:15pm Addthis New groundwater contamination treatment equipment sits outside the C-612 Northwest Pump-and-Treat facility. New groundwater contamination treatment equipment sits outside the C-612 Northwest Pump-and-Treat facility. A computer-modeled illustration shows the off-site

  15. Summary - Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    Paducah, KY EM Project: On-Site Disposal Facility ETR Report Date: August 2008 ETR-16 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Proposed On-Site Disposal Facility(OSDF) at the Paducah Gaseous Diffusion Plant Why DOE-EM Did This Review The Paducah Gaseous Diffusion Plant (PGDP) is an active uranium enrichment facility that was placed on the National Priorities List. DOE is required to remediate the PGDP in accordance with the

  16. DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and security; environment, safety, health and quality (ESH&Q) program; and training ... Addthis Related Articles DOE Issues Final Request for Proposal for Paducah Gaseous ...

  17. Paducah Community Relations Plan

    Broader source: Energy.gov [DOE]

    The Paducah Community Relations Plan is a primary document of the FFA that directs the comprehensive remediation of the PGDP site. The Paducah CRP describes how DOE will provide opportunities for...

  18. DOE Seeks Quotes for Paducah Gaseous Diffusion Plant Environmental

    Office of Environmental Management (EM)

    Technical Services | Department of Energy Quotes for Paducah Gaseous Diffusion Plant Environmental Technical Services DOE Seeks Quotes for Paducah Gaseous Diffusion Plant Environmental Technical Services August 13, 2012 - 12:00pm Addthis Media Contact Bill Taylor Bill.Taylor@srs.gov 803-952-8564 Cincinnati- The Department of Energy (DOE) today issued a Request for Quotation (RFQ) for an Environmental Technical Services acquisition at the Paducah Gaseous Diffusion Plant (GDP) for the

  19. Cleanup Chief Visits Portsmouth, Paducah Sites | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup Chief Visits Portsmouth, Paducah Sites Cleanup Chief Visits Portsmouth, Paducah Sites February 11, 2016 - 12:45pm Addthis EM Assistant Secretary Dr. Monica Regalbuto sits in on a procedure review with facility operator Jim Burnett (left) of Fluor Paducah Deactivation Project at C-337, where a former uranium enrichment process building will be the first facility to undergo deposit removal by in-situ chemical treatment. EM Assistant Secretary Dr. Monica Regalbuto sits in on a procedure

  20. Site-specific earthquake response analysis for Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect (OSTI)

    Sykora, D.W.; Davis, J.J.

    1993-08-01

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the US Department of Energy (DOE) and operated under contract by Martin Marietta Energy systems, Inc., is located southwest of Paducah, Kentucky. An aerial photograph and an oblique sketch of the plant are shown in Figures 1 and 2, respectively. The fenced portion of the plant consists of 748 acres. This plant was constructed in the 1950`s and is one of only two gaseous diffusion plants in operation in the United States; the other is located near Portsmouth, Ohio. The facilities at PGDP are currently being evaluated for safety in response to natural seismic hazards. Design and evaluation guidelines to evaluate the effects of earthquakes and other natural hazards on DOE facilities follow probabilistic hazard models that have been outlined by Kennedy et al. (1990). Criteria also established by Kennedy et al. (1990) classify diffusion plants as ``moderate hazard`` facilities. The US Army Engineer Waterways Experiment Station (WES) was tasked to calculate the site response using site-specific design earthquake records developed by others and the results of previous geotechnical investigations. In all, six earthquake records at three hazard levels and four individual and one average soil columns were used.

  1. Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant Full Document and Summary Versions...

  2. DOE Releases Request for Information for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deactivation & Remediation Services | Department of Energy Releases Request for Information for Paducah Gaseous Diffusion Plant Deactivation & Remediation Services DOE Releases Request for Information for Paducah Gaseous Diffusion Plant Deactivation & Remediation Services September 2, 2015 - 3:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Information (RFI) seeking

  3. DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure

    Energy Savers [EERE]

    Support Services | Department of Energy Paducah Gaseous Diffusion Plant Infrastructure Support Services DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure Support Services June 17, 2015 - 5:45pm Addthis Media Contact: Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Swift & Staley, Inc. of Kevil, Kentucky, for the performance of infrastructure support services at the

  4. Paducah Site Interns Learn About EM Opportunities | Department of Energy

    Energy Savers [EERE]

    Paducah Site Interns Learn About EM Opportunities Paducah Site Interns Learn About EM Opportunities August 28, 2014 - 12:00pm Addthis LATA Kentucky groundwater cleanup site superintendent Donnie Bell, far right, describes the project to (from left) Steve Christmas of LATA Kentucky and interns Weston Loyd, Matthew Jehnke, and Wesley Morgan. LATA Kentucky groundwater cleanup site superintendent Donnie Bell, far right, describes the project to (from left) Steve Christmas of LATA Kentucky and

  5. DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    Infrastructure Support Services | Department of Energy Seeks Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services June 10, 2014 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking eligible small businesses under North American Industry

  6. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants | Department

    Energy Savers [EERE]

    of Energy and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth Sites Advance Operations at DUF6 Plants November 1, 2011 - 12:00pm Addthis First cylinder enters plant. First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth - Babcock & Wilcox Conversion Services (BWCS) began work at the Paducah and Portsmouth sites

  7. EM's Paducah Site Completes Building Removals | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals June 29, 2015 - 12:00pm Addthis Once the building was down, heavy equipment operators began “top-down” shearing to safely remove the remaining structure. Demolition debris was then downsized and loaded into rail cars for shipment off site. Once the building was down, heavy equipment operators began "top-down" shearing to safely remove the remaining structure. Demolition debris was then

  8. Paducah Site annual environmental report summary for 1994

    SciTech Connect (OSTI)

    Horak, C.M.

    1996-02-01

    This pamphlet contains summaries of the environmental programs at the Paducah Gaseous Plant site, environmental monitoring and the results, and the impact of operations on the environment and the public for 1994.

  9. Paducah | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Paducah Portsmouth Gaseous Diffusion Plant | November 2009 Aerial View Portsmouth Gaseous Diffusion Plant | November 2009 Aerial View DOE missions at Paducah includes...

  10. Workers at Paducah Site Exceed 1.5 Million Hours Without Lost...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness Workers at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness October 30, 2014 -...

  11. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support Services | Department of Energy Paducah Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services October 6, 2014 - 4:13pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the performance of infrastructure support services at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky. A

  12. Department of Energy’s Paducah Site Reaches Million-Hour Safety Milestone

    Broader source: Energy.gov [DOE]

    PADUCAH, KY – The U.S. Department of Energy’s Paducah Site has reached a million hours of safe work toward completing cleanup objectives to reduce environmental risk.

  13. Workers at Paducah Site Exceed 1.5 Million Hours Without Lost-Time Injury, Illness

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Workers with Paducah site infrastructure contractor Swift & Staley, Inc. recently exceeded 1.5 million hours without lost time away from work due to injury or illness, representing nine years of safe performance.

  14. Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 April 1, 2012 - 12:00pm Addthis Deep soil mixing at the Paducah site will involve a large-diameter auger like this one. Deep soil mixing at the Paducah site will involve a large-diameter auger like this one. Senior Advisor for Environmental Management David Huizenga (right) and Paducah Site Lead Reinhard Knerr look at a three-dimensional model

  15. Paducah CAB Board meeting - March | Department of Energy

    Energy Savers [EERE]

    Paducah CAB Board meeting - March Paducah CAB Board meeting - March March 17, 2016 6:00PM to 8:00PM CDT Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab

  16. Paducah Citizens Advisory Board Meeting - January | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Citizens Advisory Board Meeting - January Paducah Citizens Advisory Board Meeting - January January 21, 2016 6:00PM to 8:00PM CST Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab

  17. Paducah Site Annual Site Environmental Report for Calendar Year 2012

    Energy Savers [EERE]

    Paducah Site Annual Site Environmental Report for Calendar Year 2012 Fractions and Multiples of Units Multiple Decimal Equivalent Prefix Symbol Engineering Format 10 6 1,000,000 mega- M E+06 10 3 1,000 kilo- k E+03 10 2 100 hecto- h E+02 10 10 deka- da E+01 10 -1 0.1 deci- d E-01 10 -2 0.01 centi- c E-02 10 -3 0.001 milli- m E-03 10 -6 0.000001 micro- μ E-06 10 -9 0.000000001 nano- n E-09 10 -12 0.000000000001 pico- P E-12 10 -15 0.000000000000001 femto- F E-15 10 -18 0.000000000000000001 atto-

  18. Paducah Public Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outreach » Paducah Public Documents Paducah Public Documents Paducah Key Regulatory Documents Paducah Federal Facility Agreement - The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised Statute

  19. Paducah Cleanup Progress | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Paducah Cleanup Progress Since 1990, DOE has invested $1.9 billion in successful Paducah site cleanup projects to protect human health and the environment. The Environmental Management (EM) cleanup mission will continue through GDP transition and decontamination and decommissioning. Significant Paducah Site Cleanup Progress since 1990: Paducah leanup Progress graphic Recent Progress A panoramic view of the east end of the C-410 complex shows a rainbow forming as sunlight passes through

  20. Paducah Public Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community Outreach » Paducah Public Documents Paducah Public Documents Paducah Key Regulatory Documents Paducah Federal Facility Agreement - The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised

  1. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

  2. Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Undergoing Steady Groundwater Cleanup with Variety of Methods Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods June 1, 2012 - 12:00pm Addthis The yellow outline depicts an area southeast of the C-400 Cleaning Building, background, where electrical resistance heating will be used to remove trichloroethene (TCE) down to 60 feet below ground. Electrodes will heat the chemical into a vapor that can be pumped to the surface and treated in the white

  3. Paducah Site annual environmental report summary for 1995

    SciTech Connect (OSTI)

    Belcher, G.

    1997-01-01

    This report contains summaries of the environmental programs at the Paducah Site, as well as the impacts of its operations on the environment and the public for 1995. The results of environmental monitoring are presented. The goal is to keep emissions as low as possible, enhance the strict safety controls that are in place and use state-of-the-art technology to complete environmental remediation projects in the most cost-effective and efficient manner possible.

  4. Cost-Efficient Work Rids Paducah Site of Old Facilities | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Cost-Efficient Work Rids Paducah Site of Old Facilities Cost-Efficient Work Rids Paducah Site of Old Facilities April 25, 2012 - 12:00pm Addthis Old trailers that had sat for decades in the southwestern part of the Paducah site were cut up and placed in containers so that the debris could be placed in the site’s industrial landfill. Old trailers that had sat for decades in the southwestern part of the Paducah site were cut up and placed in containers so that the debris could be

  5. DOE Extends Paducah Infrastructure Support Services Contract | Department

    Energy Savers [EERE]

    of Energy March 20, 2015 - 3:30pm Addthis Media Contact: Brad Mitzelfelt, 859-219-4035, brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy (DOE) today announced that it is extending its contract for Infrastructure Support Services at the Paducah Gaseous Diffusion Plant for a period of three months. The contract period for the current contractor, Swift & Staley, Inc. (SSI), had been scheduled to expire on March 30, 2015. This contract extension, valued at

  6. Paducah CAB Subcommittee Meeting - January | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - January January 21, 2016 5:30PM to 7:00PM CST Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab.energy.gov...

  7. Paducah CAB Board Meeting - November | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    5 6:00PM to 8:00PM CST Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab.energy.gov...

  8. Paducah CAB Subcommittee Meetings - February (re-scheduled from...

    Energy Savers [EERE]

    from January) February 4, 2016 5:00PM to 7:00PM CST Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab

  9. Paducah CAB Subcommittee Meetings - February (re-scheduled from...

    Energy Savers [EERE]

    from January) February 18, 2016 5:00PM to 7:00PM CST Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab

  10. Paducah CAB Board meeting - August | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    27, 2015 6:00PM to 8:00PM CDT Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab.energy.gov...

  11. Paducah CAB Board and Subcommittees - November | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - November November 19, 2015 6:00PM to 8:00PM CST Paducah CAB Office, 111 Memorial Drive, Paducah, KY 42001 Contact Buz Smith, DOE Site Office 270-441-6821 www.pgdpcab...

  12. DOE Extends Paducah Infrastructure Support Services Contract | Department

    Energy Savers [EERE]

    of Energy September 15, 2015 - 5:00pm Addthis Media Contact Brad Mitzelfelt, 859-219-4035 brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for Infrastructure Support Services at the Paducah Gaseous Diffusion Plant for a period of 2.5 months. The contract period for the current contractor, Swift & Staley, Inc. (SSI), had been scheduled to expire on September 15, 2015. Today's

  13. PADUCAH 2015 YEAR IN REVIEW

    Energy Savers [EERE]

    PADUCAH 2015 YEAR IN REVIEW "2015 has been a pivotal year at the Paducah Site. Now that we have successfully transitioned the gaseous diffusion plant from NRC oversight to DOE oversight and DOE has the entire site back for the first time in almost 20 years, major deactivation activities are under way to prepare the site for future decontamination and decommissioning. We are fortunate to have a highly skilled federal and contractor workforce in place to safely and successfully continue this

  14. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    SciTech Connect (OSTI)

    N /A

    2003-11-28

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). Although not part of the proposed action, an option of shipping all cylinders (DUF{sub 6}, low-enriched UF{sub 6} [LEU-UF{sub 6}], and empty) stored at the East Tennessee Technology Park (ETTP) near Oak Ridge, Tennessee, to Paducah rather than to Portsmouth is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Paducah site. A separate EIS (DOE/EIS-0360) evaluates the potential environmental impacts for the proposed Portsmouth conversion facility.

  15. Paducah Waste Disposal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Remediation » Paducah Waste Disposal Paducah Waste Disposal The U.S. Department of Energy (DOE) is looking at options to dispose of waste that will be generated from further cleanup of the Paducah Gaseous Diffusion Plant. Cleanup of the Site is projected to create an estimated 3.6 million cubic yards of demolition debris, metals, soils, asbestos and other material. DOE is using the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process to make a decision

  16. Top Three Topics and Achievements by Site

    Office of Environmental Management (EM)

    October 20, 2011 Paducah Fully support the DOE Asset Revitalization Initiative Incorporate clean energy technologies at the Paducah site - solar, bio-fuels, clean coal, etc. ...

  17. New Website to Keep Portsmouth, Paducah Site Stakeholders Up to Date |

    Energy Savers [EERE]

    Department of Energy Website to Keep Portsmouth, Paducah Site Stakeholders Up to Date New Website to Keep Portsmouth, Paducah Site Stakeholders Up to Date March 30, 2015 - 12:00pm Addthis A view of PPPO’s retooled website on a smartphone and laptop. A view of PPPO's retooled website on a smartphone and laptop. LEXINGTON, Ky. - The Portsmouth/Paducah Project Office (PPPO) has launched a new website to provide timely and accessible public information about EM's cleanup efforts at the

  18. Building Removal Ongoing at DOE’s Paducah Site

    Broader source: Energy.gov [DOE]

    PADUCAH, KY – Work is ongoing at the Paducah Gaseous Diffusion Plant (PGDP) to raze a 65,000-square-foot facility known as the C-340 Metals Plant, which was used to make uranium metal during the Cold War.

  19. Paducah Site Exceeds 2.5 Million Hours Without Lost Workdays

    Broader source: Energy.gov [DOE]

    This month, EM’s cleanup contractor at the Paducah site celebrated surpassing 2.5 million work hours without lost workdays resulting from job-related injury or illness.

  20. In-Ground Heating Removes Groundwater Contamination at EM's Paducah Site

    Energy Savers [EERE]

    | Department of Energy In-Ground Heating Removes Groundwater Contamination at EM's Paducah Site In-Ground Heating Removes Groundwater Contamination at EM's Paducah Site May 29, 2014 - 12:00pm Addthis A crane lowers the carbon treatment system into place during construction. A crane lowers the carbon treatment system into place during construction. The treatment system operates in front of the C-400 Cleaning Building. The treatment system operates in front of the C-400 Cleaning Building. Andy

  1. EM Reviews Portsmouth, Paducah Site Contractor Performance, Determines Award Fees

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – EM has completed annual performance evaluations of four prime contractors working on the deactivation, decontamination, and decommissioning of the former gaseous diffusion plants near Portsmouth, Ohio and Paducah, Kentucky.

  2. Dose Modeling Evaluations and Technical Support Document For the Authorized Limits Request for the DOE-Owned Property Outside the Limited Area, Paducah Gaseous Diffusion Plant Paducah, Kentucky

    SciTech Connect (OSTI)

    Boerner, A. J.; Maldonado, D. G.; Hansen, Tom

    2012-09-01

    Environmental assessments and remediation activities are being conducted by the U.S. Department of Energy (DOE) at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky. The Oak Ridge Institute for Science and Education (ORISE), a DOE prime contractor, was contracted by the DOE Portsmouth/Paducah Project Office (DOE-PPPO) to conduct radiation dose modeling analyses and derive single radionuclide soil guidelines (soil guidelines) in support of the derivation of Authorized Limits (ALs) for 'DOE-Owned Property Outside the Limited Area' ('Property') at the PGDP. The ORISE evaluation specifically included the area identified by DOE restricted area postings (public use access restrictions) and areas licensed by DOE to the West Kentucky Wildlife Management Area (WKWMA). The licensed areas are available without restriction to the general public for a variety of (primarily) recreational uses. Relevant receptors impacting current and reasonably anticipated future use activities were evaluated. In support of soil guideline derivation, a Conceptual Site Model (CSM) was developed. The CSM listed radiation and contamination sources, release mechanisms, transport media, representative exposure pathways from residual radioactivity, and a total of three receptors (under present and future use scenarios). Plausible receptors included a Resident Farmer, Recreational User, and Wildlife Worker. single radionuclide soil guidelines (outputs specified by the software modeling code) were generated for three receptors and thirteen targeted radionuclides. These soil guidelines were based on satisfying the project dose constraints. For comparison, soil guidelines applicable to the basic radiation public dose limit of 100 mrem/yr were generated. Single radionuclide soil guidelines from the most limiting (restrictive) receptor based on a target dose constraint of 25 mrem/yr were then rounded and identified as the derived soil guidelines. An additional evaluation using the derived soil guidelines as inputs into the code was also performed to determine the maximum (peak) dose for all receptors. This report contains the technical basis in support of the DOE?s derivation of ALs for the 'Property.' A complete description of the methodology, including an assessment of the input parameters, model inputs, and results is provided in this report. This report also provides initial recommendations on applying the derived soil guidelines.

  3. Paducah | Department of Energy

    Energy Savers [EERE]

    Paducah Paducah Below are compliance agreements for the Paducah site, and summaries of the agreements are included. These agreements help in promoting cooperation between EM, Department organizations, and state agencies. PDF icon Federal Facility Agreement for the Paducah Gaseous Diffusion Plant PDF icon Federal Facility Agreement for the Paducah Gaseous Diffusion Plant Summary PDF icon Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agreement, February 20, 1992 PDF

  4. Portsmouth DOE & Site Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Background » Portsmouth DOE & Site Contractors Portsmouth DOE & Site Contractors DOE Portsmouth Responsibilities at the site have evolved over time as DOE and its predecessors have maintained a presence since the 1950s. DOE will continue to manage the cleanup activities at the site until completion. The Portsmouth/Paducah Project Office (PPPO) was established by the Office of Environmental Management to provide leadership and focus to the specific cleanup challenges at the

  5. Deactivation Project Begins at Paducah Gaseous Diffusion Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Begins at Paducah Gaseous Diffusion Plant Deactivation Project Begins at Paducah Gaseous Diffusion Plant October 21, 2014 - 5:00pm Addthis EM Paducah site lead Jennifer Woodard...

  6. Paducah Gaseous Diffusion Plant Transition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gaseous Diffusion Plant Transition Paducah Gaseous Diffusion Plant Transition GDP Shutdown Paducah site_map-USEC_lease.jpg The Energy Policy Act of 1992 transferred operational responsibility for the site's uranium enrichment operations to the United States Enrichment Corporation (USEC), originally a government corporation that became a publicly held company in 1998. USEC assumed responsibility for enrichment operations at the Paducah Gaseous Diffusion Plant (GDP) and leased property from DOE.

  7. Community Visions for the Paducah Gaseous Diffusion Plant Site

    SciTech Connect (OSTI)

    Ormsbee, Lindell e; Kipp, James A

    2011-09-01

    This report focuses on assessing community preferences for the future use of the PGDP site, given the site's pending closure by US DOE. The project approach fostered interaction and engagement with the public based on lessons learned at other complex DOE environmental cleanup sites and upon the integration of a number of principles and approaches to public engagement from the Project Team's local, state, regional and international public engagement experience. The results of the study provide the community with a record of the diversity of values and preferences related to the environmental cleanup and future use of the site.

  8. Paducah Community Outreach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outreach Paducah Community Outreach Paducah Citizens Advisory Board Meeting Paducah Citizens Advisory Board Meeting Students compete in West Kentucky Regional Science Bowl Students compete in West Kentucky Regional Science Bowl Paducah groundwater model public exhibit Paducah groundwater model public exhibit Paducah Citizens Advisory Board Meeting Students compete in West Kentucky Regional Science Bowl Paducah groundwater model public exhibit DOE is committed to fostering meaningful public

  9. Paducah Community Outreach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community Outreach Paducah Community Outreach Paducah Citizens Advisory Board Meeting Paducah Citizens Advisory Board Meeting Students compete in West Kentucky Regional Science Bowl Students compete in West Kentucky Regional Science Bowl Paducah groundwater model public exhibit Paducah groundwater model public exhibit Paducah Citizens Advisory Board Meeting Students compete in West Kentucky Regional Science Bowl Paducah groundwater model public exhibit DOE is committed to fostering meaningful

  10. Review of earthquake hazard assessments of plant sites at Paducah, Kentucky and Portsmouth, Ohio

    SciTech Connect (OSTI)

    1997-03-01

    Members of the US Geological Survey staff in Golden, Colorado, have reviewed the submissions of Lawrence Livermore National Laboratory (LLNL) staff and of Risk Engineering, Inc. (REI) (Golden, Colorado) for seismic hazard estimates for Department of Energy facilities at Portsmouth, Ohio, and Paducah, Kentucky. We reviewed the historical seismicity and seismotectonics near the two sites, and general features of the LLNL and EPRI/SOG methodologies used by LLNL and Risk Engineering respectively, and also the separate Risk Engineering methodology used at Paducah. We discussed generic issues that affect the modeling of both sites, and performed alternative calculations to determine sensitivities of seismic hazard results to various assumptions and models in an attempt to assign reasonable bounding values of the hazard. In our studies we find that peak acceleration values of 0.08 g for Portsmouth and 0.32 g for Paducah represent central values of the, ground motions obtained at 1000-year return periods. Peak accelerations obtained in the LLNL and Risk Engineering studies have medians near these values (results obtained using the EPRI/SOG methodology appear low at both sites), and we believe that these medians are appropriate values for use in the evaluation of systems, structures, and components for seismic structural integrity and for the seismic design of new and improved systems, structures, and components at Portsmouth and Paducah.

  11. Paducah Environmental Remediation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Remediation Paducah Environmental Remediation Featured Project Video: Demolition work Completed at the C-410 Feed Plant Facility at the Paducah Site Since 1990, DOE has invested $1.9 billion dollars in successful site cleanup More than 60 years of uranium enrichment operations and support activities generated hazardous, radioactive, mixed (both hazardous and radioactive), and non-chemical (sanitary) waste. Past operations also resulted in soil, groundwater, and surface water contamination.

  12. EIS-0359: Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site

    Broader source: Energy.gov [DOE]

    This site-specific EIS considers the construction, operation, maintenance, and decontamination and decommissioning of the proposed depleted uranium hexafluoride (DUF6) conversion facility at three locations within the Paducah site; transportation of depleted uranium conversion products and waste materials to a disposal facility; transportation and sale of the hydrogen fluoride (HF) produced as a conversion co-product; and neutralization of HF to calcium fluoride and its sale or disposal in the event that the HF product is not sold.

  13. Paducah Gaseous Diffusion Plant Annual Site Environmental Report for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The purpose of this document is to summarize effluent monitoring and environmental surveillance results and compliance with environmental laws, regulations, and orders at the Paducah Gaseous Diffusion Plant (PGDP). Environmental monitoring at PGDP consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is direct measurement or the collection and analysis of samples of liquid and gaseous discharges to the environment. Environmental surveillance is direct measurement or the collection and analysis of samples of air, water, soil, foodstuff, biota, and other media. Environmental monitoring is performed to characterize and quantify contaminants, assess radiation exposures of members of the public, demonstrate compliance with applicable standards and permit requirements, and detect and assess the effects (if any) on the local environment. Multiple samples are collected throughout the year and are analyzed for radioactivity, chemical content, and various physical attributes.

  14. Innovative Approach Reduces Costs of Removing Contaminated Oil from Paducah Site

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – For more than 60 years, 60 electrical distribution transformers supplied some of the power to enrich uranium at the Paducah Gaseous Diffusion Plant (PGDP).

  15. Final environmental impact assessment of the Paducah Gaseous Diffusion Plant site, Paducah, Kentucky

    SciTech Connect (OSTI)

    Not Available

    1982-08-01

    This document considers: the need for uranium enrichment facilities; site location; plant description; and describes the power generating facilities in light of its existing environment. The impacts from continuing operations are compared with alternatives of shutdown, relocation, and alternative power systems. (PSB)

  16. Paducah Gaseous Diffusion Plant Annual Site Environmental Report summary for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This report contains summaries of the environmental programs at Paducah Gaseous Diffusion Plant, environmental monitoring and the results, and the impact of operations on the environment and the public for 1993. The environmental monitoring program at Paducah includes effluent monitoring and environmental surveillance. Effluent monitoring is measurement of releases as they occur. Contaminants are released through either airborne emissions or liquids discharged from the plant. These releases occur as part of normal site operations, such as cooling water discharged from the uranium enrichment cascade operations or airborne releases from ventilation systems. In the event of system failure, this monitoring provides timely warning so that corrective action can be taken before releases reach an unsafe level. Environmental surveillance tracks the dispersion of materials into the environment after they have been released. This involves the collection of samples from various media, such as water, soil, vegetation, and food crops, and the analysis of these samples for certain radionuclides, chemicals, and metals.

  17. Summary - Building C-400 Thermal Treatment Remedial Design Report and Investigation, Paducah, Kentucky

    Office of Environmental Management (EM)

    Paducah, KY EM Project: Building C400 Thermal Treatment ETR Report Date: August 2007 ETR-8 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation, Paducah Kentucky Why DOE-EM Did This Review The groundwater underlying the Paducah Gaseous Diffusion Plant (PGDP) is contaminated by chlorinated solvents, principally trichloroethylene (TCE), as well as other

  18. Paducah Background | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Background Paducah Background Click image for interactive historical timeline of the Paducah Site. Click image for interactive historical timeline of the Paducah Site. In October 1950, the United States Atomic Energy Commission selected a former World War II munitions plant near Paducah, Kentucky, known as Kentucky Ordnance Works, as the site for the second of three planned uranium enrichment plants in the United States. The other two enrichment plants were located near Portsmouth, Ohio and Oak

  19. DOE Awards Contract for Paducah Gaseous Diffusion Plant Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The primarily firm-fixed-price nature of the contract will allow DOE to hold the contractor accountable for meeting the contract requirements. Infrastructure support services to be ...

  20. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    security; Environment, safety, health and quality (ESH&Q) program; and Training services. ... Addthis Related Articles DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant ...

  1. Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant

    Office of Environmental Management (EM)

    i TABLE OF CONTENTS 1. INTRODUCTION 1 2. LINE OF INQUIRY NO. 1 - Future Uses of the Subtitle D Landfill 2 3. LINE OF INQUIRY NO. 2 - OSDF Siting in a Brownfield Area 3 4. LINE OF INQUIRY NO. 3 - Seismic Issues 4 5. LINE OF INQUIRY NO. 4 - Post-Closure Public Use of the OSDF 5 6. LINE OF INQUIRY NO. 5 - Public Communication Plan 7 7. LINE OF INQUIRY NO. 6 - Baseline Schedule 8 8. RECOMMENDATIONS 8 9. ACKNOWLEDGEMENT 10 10. REFERENCES 10 APPENDIX 11 1 1. INTRODUCTION The Paducah Gaseous Diffusion

  2. APPLICATION OF THE LASAGNA{trademark} SOIL REMEDIATION TECHNOLOGY AT THE DOE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Swift, Barry D.; Tarantino, Joseph J., P. E.

    2003-02-27

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the Department of Energy (DOE), has been enriching uranium since the early 1950s. The enrichment process involves electrical and mechanical components that require periodic cleaning. The primary cleaning agent was trichloroethene (TCE) until the late 1980s. Historical documentation indicates that a mixture of TCE and dry ice were used at PGDP for testing the integrity of steel cylinders, which stored depleted uranium. TCE and dry ice were contained in a below-ground pit and used during the integrity testing. TCE seeped from the pit and contaminated the surrounding soil. The Lasagna{trademark} technology was identified in the Record of Decision (ROD) as the selected alternative for remediation of the cylinder testing site. A public-private consortium formed in 1992 (including DOE, the U.S. Environmental Protection Agency, and the Kentucky Department for Environmental Protection, Monsanto, DuPont, and General Electric) developed the Lasagna{trademark} technology. This innovative technology employs electrokinetics to remediate soil contaminated with organics and is especially suited to sites with low permeability soils. This technology uses direct current to move water through the soil faster and more uniformly than hydraulic methods. Electrokinetics moves contaminants in soil pore water through treatment zones comprised of iron filings, where the contaminants are decomposed to basic chemical compounds such as ethane. After three years of development in the laboratory, the consortium field tested the Lasagna{trademark} process in several phases. CDM installed and operated Phase I, the trial installation and field test of a 150-square-foot area selected for a 120-day run in 1995. Approximately 98 percent of the TCE was removed. CDM then installed and operated the next phase (IIa), a year-long test on a 600-square-foot site. Completed in July 1997, this test removed 75 percent of the total volume of TCE down to a depth of 45 feet. TCE in the test sites. Based on the successful field tests (Phases I and IIa), the ROD was prepared and the Lasagna{trademark} alternative was selected for remediation of TCE contaminated soils at the cylinder testing site Solid Waste Management Unit 91(SWMU 91). Bechtel Jacobs Company LLC contracted CDM to construct and operate a full-scale Lasagna{trademark} remediation system at the site (Phase IIb). Construction began in August 1999 and the operational phase was initiated in December 1999. The Lasagna{trademark} system was operated for two years and reduced the average concentration of TCE in SWMU 91 soil from 84 ppm to less than 5.6 ppm. Verification sampling was conducted during May, 2002. Results of the verification sampling indicated the average concentration of TCE in SWMU 91 soil was 0.38 ppm with a high concentration of 4.5 ppm.

  3. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Assessment (EA) for Potential Land and Facilities Transfers at the Paducah Gaseous Diffusion Plant in McCracken County, Kentucky. DOE is inviting comments on...

  4. Paducah Package Steam Boilers to Provide Efficiency, Environmental Benefits

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Five modern, modular steam boilers have replaced three larger coal-fired boilers that comprised the steam plant at EM’s Paducah Site.

  5. Portsmouth Paducah Project Office

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) established the Portsmouth/Paducah Project Office (PPPO) on October 1, 2003, to provide focused leadership to the Environmental Management missions at the...

  6. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky

    Office of Environmental Management (EM)

    Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers, McCracken County, Kentucky U.S. Department of Energy Portsmouth/Paducah Project Office December 2015 DOE/EA-1927 ACRONYMS AND ABBREVIATIONS CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act of 1980 CFR Code of Federal Regulations dBA A-weighted decibel DOE U.S. Department of Energy DUF 6 depleted uranium hexafluoride EA

  7. Assessment of the influences of groundwater colloids on the migration of technetium-99 at the Paducah Gaseous Diffusion Plant Site in Paducah, Kentucky

    SciTech Connect (OSTI)

    Gu, B.; McDonald, J.A.; McCarthy, J.F.; Clausen, J.L.

    1994-07-01

    This short report summarizes the influences of groundwater colloids on the migration/transport of {sup 99}Tc at the Paducah Gaseous Diffusion Plant (PGDP) site in Paducah, Kentucky. Limited data suggest that inorganic colloidal materials (e.g., aluminosilicate clay minerals) may not play a significant role in the retention and transport of Tc. Studies by size fractionation reveal that both Tc and natural organic matter (NOM) are largely present in the <3K fraction. The role of NOM on Tc retention and transport is not conclusive on the basis of this study. However, a literature review suggests that Tc is very likely associated with the groundwater organics. The presence of the organic matter could have increased the solubility and cotransport of Tc at the PGDP site. Further studies, applying such techniques as gel chromatography, size exclusion, and spectroscopy, may be useful to determine the association of organic matter with Tc. If Tc is associated with groundwater organics, appropriate protocols for removal of organic matter associated with Tc may be developed. Time and resources were limited so this study is not comprehensive with respect to the role of mobile organic and inorganic colloidal materials on Tc transport in subsurface soils. The redox conditions (DO) of groundwaters reported may not represent the true groundwater conditions, which could have influenced the association and dissociation of Tc with groundwater colloidal materials. Because Tc concentrations in the groundwater (on the order of nCi/L) at the PGDP site is much lower than the solubility of reduced Tc (IV) (on the order of {approximately}10{sup {minus}8} mol/L or parts per billion), regardless of the redox conditions, Tc will stay in solution phase as TC(IV) or Tc(VII). The mechanisms of adsorption/association vs precipitation must be understood under reduced and low Tc conditions so that strategic plans for remediation of Tc contaminated soils and groundwaters can be developed.

  8. Paducah News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Site » Paducah Community Outreach » Paducah News Paducah News December 30, 2015 An excavator with a shear attachment performs "top-down" shearing during final stages of the demolition of the C-410/C-420 UF6 Feed Plant Complex in June. Demolition debris was downsized and loaded into rail cars for shipment off site. The complex was the last of 32 inactive facilities to be removed as part of the cleanup scope that existed before commercial uranium enrichment operations ended at

  9. REVIEW REPORT: BUILDING C-400 THERMAL TREATMENT 90 PERCENT REMEDIAL DESIGN REPORT AND SITE INVESTIGATION, PGDP, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B; Jed Costanza, J; Eva Davis, E; Joe Rossabi, J; Lloyd Stewart, L; Hans Stroo, H

    2007-08-15

    On 9 April 2007, the U.S. Department of Energy (DOE) Headquarters, Office of Soil and Groundwater Remediation (EM-22) initiated an Independent Technical Review (ITR) of the 90% Remedial Design Report (RDR) and Site Investigation (RDSI) for thermal treatment of trichloroethylene (TCE) in the soil and groundwater in the vicinity of Building C-400 at the Paducah Gaseous Diffusion Plant (PGDP). The general ITR goals were to assess the technical adequacy of the 90% RDSI and provide recommendations sufficient for DOE to determine if modifications are warranted pertaining to the design, schedule, or cost of implementing the proposed design. The ultimate goal of the effort was to assist the DOE Paducah/Portsmouth Project Office (PPPO) and their contractor team in ''removing'' the TCE source zone located near the C-400 Building. This report provides the ITR findings and recommendations and supporting evaluations as needed to facilitate use of the recommendations. The ITR team supports the remedial action objective (RAO) at C-400 to reduce the TCE source area via subsurface Electrical Resistance Heating (ERH). Further, the ITR team commends PPPO, their contractor team, regulators, and stakeholders for the significant efforts taken in preparing the 90% RDR. To maximize TCE removal at the target source area, several themes emerge from the review which the ITR team believes should be considered and addressed before implementing the thermal treatment. These themes include the need for: (1) Accurate and site-specific models as the basis to verify the ERH design for full-scale implementation for this challenging hydrogeologic setting; (2) Flexible project implementation and operation to allow the project team to respond to observations and data collected during construction and operation; (3) Defensible performance metrics and monitoring, appropriate for ERH, to ensure sufficient and efficient clean-up; and (4) Comprehensive (creative and diverse) contingencies to address the potential for system underperformance, and other unforeseen conditions These themes weave through the ITR report and the various analyses and recommendations. The ITR team recognizes that a number of technologies are available for treatment of TCE sources. Further, the team supports the regulatory process through which the selected remedy is being implemented, and concurs that ERH is a potentially viable remedial technology to meet the RAOs adjacent to C-400. Nonetheless, the ITR team concluded that additional efforts are needed to provide an adequate basis for the planned ERH design, particularly in the highly permeable Regional Gravel Aquifer (RGA), where sustaining target temperatures present a challenge. The ERH design modeling in the 90% RDR does not fully substantiate that heating in the deep RGA, at the interface with the McNairy formation, will meet the design goals; specifically the target temperatures. Full-scale implementation of ERH to meet the RAOs is a challenge in the complex hydrogeologic setting at PGDP. Where possible, risks to the project identified in this ITR report as ''issues'' and ''recommendations'' should be mitigated as part of the final design process to increase the likelihood of remedial success. The ITR efforts were organized into five lines of inquiry (LOIs): (1) Site investigation and target zone delineation; (2) Performance objectives; (3) Project and design topics; (4) Health and safety; and (5) Cross cutting and independent cost evaluation. Within each of these LOIs, the ITR team identified a series of unresolved issues--topics that have remaining uncertainties or potential project risks. These issues were analyzed and one or more recommendations were developed for each. In the end, the ITR team identified 27 issues and provided 50 recommendations. The issues and recommendations are briefly summarized below, developed in Section 5, and consolidated into a single list in Section 6. The ITR team concluded that there are substantive unresolved issues and system design uncertainties, resulting in technical and financial risks to DOE.

  10. DOE site performance assessment activities. Radioactive Waste Technical Support Program

    SciTech Connect (OSTI)

    Not Available

    1990-07-01

    Information on performance assessment capabilities and activities was collected from eight DOE sites. All eight sites either currently dispose of low-level radioactive waste (LLW) or plan to dispose of LLW in the near future. A survey questionnaire was developed and sent to key individuals involved in DOE Order 5820.2A performance assessment activities at each site. The sites surveyed included: Hanford Site (Hanford), Idaho National Engineering Laboratory (INEL), Los Alamos National Laboratory (LANL), Nevada Test Site (NTS), Oak Ridge National Laboratory (ORNL), Paducah Gaseous Diffusion Plant (Paducah), Portsmouth Gaseous Diffusion Plant (Portsmouth), and Savannah River Site (SRS). The questionnaire addressed all aspects of the performance assessment process; from waste source term to dose conversion factors. This report presents the information developed from the site questionnaire and provides a comparison of site-specific performance assessment approaches, data needs, and ongoing and planned activities. All sites are engaged in completing the radioactive waste disposal facility performance assessment required by DOE Order 5820.2A. Each site has achieved various degrees of progress and have identified a set of critical needs. Within several areas, however, the sites identified common needs and questions.

  11. New Phase of Demolition Ramps Up at Paducah

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – Heavy equipment operators safely demolished the first of 12 inactive facilities set for removal in coming months as part of EM’s ongoing Paducah Site cleanup.PADUCAH, Ky. – Heavy equipment operators safely demolished the first of 12 inactive facilities set for removal in coming months as part of EM’s ongoing Paducah Site cleanup.

  12. New website will keep Portsmouth, Paducah Site stakeholders up to date

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – The Portsmouth/Paducah Project Office (PPPO) of the U.S. Department of Energy on March 17, 2015 announced the launch of a new website to provide timely and easily accessible public...

  13. EA-1927: Conveyance of Land and Facilities at the Paducah Gaseous Diffusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant for Economic Development Purposes, Paducah, Kentucky | Department of Energy EA-1927: Conveyance of Land and Facilities at the Paducah Gaseous Diffusion Plant for Economic Development Purposes, Paducah, Kentucky EA-1927: Conveyance of Land and Facilities at the Paducah Gaseous Diffusion Plant for Economic Development Purposes, Paducah, Kentucky SUMMARY DOE's Portsmouth/Paducah Project Office has prepared a Draft EA for potential land and facilities transfers at the Paducah Gaseous

  14. Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments

    Office of Environmental Management (EM)

    | Department of Energy Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments December 24, 2013 - 12:00pm Addthis A high-reach shear removes debris from the tallest structure of the C-340 complex at Paducah. Watch a video of this work here. The 120-foot-high Metals Plant was the tallest building at the Paducah site and encompassed about 1.5 million cubic feet, the volume of a football field roughly

  15. DOE EM 2015 Year in Review- Paducah Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Environmental Management (EM) has published its 2015 Year in Review, outlining the major accomplishments achieved over the course of this year at the...

  16. Floodplain/wetland assessment of the effects of construction and operation ofa depleted uranium hexafluoride conversion facility at the Paducah, Kentucky,site.

    SciTech Connect (OSTI)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This floodplain/wetland assessment has been prepared by DOE, pursuant to Executive Order 11988 (''Floodplain Management''), Executive Order 11990 (Protection of Wetlands), and DOE regulations for implementing these Executive Orders as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [''Compliance with Floodplain and Wetland Environmental Review Requirements'']), to evaluate potential impacts to floodplains and wetlands from the construction and operation of a conversion facility at the DOE Paducah site. Reconstruction of the bridge crossing Bayou Creek would occur within the Bayou Creek 100-year floodplain. Replacement of bridge components, including the bridge supports, however, would not be expected to result in measurable long-term changes to the floodplain. Approximately 0.16 acre (0.064 ha) of palustrine emergent wetlands would likely be eliminated by direct placement of fill material within Location A. Some wetlands that are not filled may be indirectly affected by an altered hydrologic regime, due to the proximity of construction, possibly resulting in a decreased frequency or duration of inundation or soil saturation and potential loss of hydrology necessary to sustain wetland conditions. Indirect impacts could be minimized by maintaining a buffer near adjacent wetlands. Wetlands would likely be impacted by construction at Location B; however, placement of a facility in the northern portion of this location would minimize wetland impacts. Construction at Location C could potentially result in impacts to wetlands, however placement of a facility in the southeastern portion of this location may best avoid direct impacts to wetlands. The hydrologic characteristics of nearby wetlands could be indirectly affected by adjacent construction. Executive Order 11990, ''Protection of Wetlands'', requires federal agencies to minimize the destruction, loss, or degradation of wetlands, and to preserve and enhance the natural and beneficial uses of wetlands. DOE regulations for implementing Executive Order 11990 as well as Executive Order 11988, ''Floodplain Management'', are set forth in 10 CFR Part 1022. Mitigation for unavoidable impacts may be developed in coordination with the appropriate regulatory agencies. Unavoidable impacts to wetlands that are within the jurisdiction of the USACE may require a CWA Section 404 Permit, which would trigger the requirement for a CWA Section 401 Water Quality Certification from the Commonwealth of Kentucky. A mitigation plan may be required prior to the initiation of construction. Cumulative impacts to floodplains and wetlands are anticipated to be negligible to minor under the proposed action, in conjunction with the effects of existing conditions and other activities. Habitat disturbance would involve settings commonly found i

  17. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment for Potential Land and Facilities Transfers

    Broader source: Energy.gov [DOE]

    DOE is evaluating the potential conveyance (lease, easement, and/or title transfer) of real property that may be determined to be excessed, underutilized or unneeded at the Paducah Gaseous Diffusion Plant (PGDP). After appropriate agency reviews, DOE could transfer PGDP real property to one or more entities for a range of economic development and/or recreational uses. DOEs potential action is designed to reduce the footprint of the site and the cost for maintenance of the site, providing opportunities for beneficial reuse. DOE prepared this Draft Environmental Assessment (EA) to analyze the potential environmental consequences associated with potential land and facilities transfers.

  18. Paducah Operations Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Timeline Paducah Operations Timeline Paducah Operations Timeline

  19. Paducah Background Factsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Background Factsheet Paducah Background Factsheet Background Fact Sheet Transfer of Depleted Uranium and Subsequent Transactions, May 15, 2012 PDF icon Paducah Background Factsheet_0.pdf More Documents & Publications Excess Uranium Inventory Management Plan 2008 2014 Review of the Potential Impact of DOE Excess Uranium Inventory On the Commercial Markets Quantification of the Potential Impact on Commercial Markets of Introduction of the Enrichment Services Component of DOE Low

  20. Paducah News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    will extend enrichment operations there for a year. April 25, 2012 Old trailers that had sat for decades in the southwestern part of the Paducah site were cut up and placed in...

  1. Independent Oversight Assessment, Portsmouth/Paducah Project Office - May

    Energy Savers [EERE]

    2012 | Department of Energy Portsmouth/Paducah Project Office - May 2012 Independent Oversight Assessment, Portsmouth/Paducah Project Office - May 2012 May 2012 Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants This report provides the results of an independent assessment of the Department of Energy's (DOE) Portsmouth/Paducah Project Office oversight of conduct of operations at DOE's depleted uranium

  2. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities

    Office of Environmental Management (EM)

    Transfers; McCracken County, Kentucky | Department of Energy 27: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky SUMMARY DOE's Portsmouth/Paducah Project Office prepared an EA that assesses the potential environmental impacts of the proposed transfer of land and facilities at the Paducah Gaseous Diffusion Plant from DOE to other

  3. Audit Report: DOE/IG-0937 | Department of Energy

    Energy Savers [EERE]

    7 Audit Report: DOE/IG-0937 June 2, 2015 The Status of Cleanup at the Department of Energy's Paducah Site The Paducah Gaseous Diffusion Plant began operating in 1952, supplying enriched uranium for commercial reactors and military defense reactors activities that resulted in radioactive and hazardous chemical material contamination of the Site. In 1988, radioactive and volatile organic contamination was found in the drinking water wells of residences near the Paducah Site. As a result, the

  4. DOE Employment - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management DOE Employment About Us DOE Human Resources Management Division DOE Employment Recognition and Awards Program Federal Employees Union (AFGE Local 788) Work Schedules ...

  5. LIQUEFACTION EVALUATIONS AT DOE SITES

    Broader source: Energy.gov [DOE]

    Liquefaction Evaluations at DOE Sites M. Lewis, M. McHood, R. Williams, B. Gutierrez October 25, 2011

  6. Paducah Needs Assessment

    Broader source: Energy.gov [DOE]

    Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

  7. U.S. Department of Energy Awards Paducah Remediation Contract To North Wind

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Cleanup Company LLC | Department of Energy Contract To North Wind Paducah Cleanup Company LLC U.S. Department of Energy Awards Paducah Remediation Contract To North Wind Paducah Cleanup Company LLC January 10, 2005 - 9:41am Addthis $303 Million Small Business Contract Runs Through September, 2009 WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that North Wind Paducah Cleanup Company LLC has been awarded a $302,962,661 small business contract to perform

  8. Liquefaction Evaluations at DOE Sites

    Office of Environmental Management (EM)

    LIQUEFACTION EVALUATIONS AT DOE SITES M. Lewis, M. McHood, R. Williams, B. Gutierrez October 25, 2011 Agenda  Background  Purpose and Objective  Liquefaction Methods  Site Evaluations  Aging  Conclusions 2 Background 3 Liquefaction at DOE Sites Background  Liquefaction evaluations are required at all DOE sites  Methods have evolved over the years, but there is currently only one consensus methodology;  Youd et al., 2001  Two other methods have emerged in the last

  9. Ground penetrating radar surveys over an alluvial DNAPL site, Paducah Gaseous Diffusion Plant, Kentucky

    SciTech Connect (OSTI)

    Carpenter, P.J. |; Doll, W.E.; Phillips, B.E.

    1994-09-01

    Ground penetrating radar (GPR) surveys were used to map shallow sands and gravels which are DNAPL migration pathways at the Paducah Gaseous Diffusion Plant in western Kentucky. The sands and gravels occur as paleochannel deposits, at depths of 17-25 ft, embedded in Pleistocene lacustrine clays. More than 30 GPR profiles were completed over the Drop Test Area (DTA) to map the top and base of the paleochannel deposits, and to assess their lateral continuity. A bistatic radar system was used with antenna frequencies of 25 and 50 MHz. An average velocity of 0.25 ft/ns for silty and clayey materials above the paleochannel deposits was established from radar walkaway tests, profiles over culverts of known depth, and comparison of radar sections with borings. In the south portion of the DTA, strong reflections corresponded to the water table at approximately 9-10 ft, the top of the paleochannel deposits at approximately 18 ft, and to gravel horizons within these deposits. The base of these deposits was not visible on the radar sections. Depth estimates for the top of the paleochannel deposits (from 50 records) were accurate to within 2 ft across the southern portion of the DTA. Continuity of these sands and gravels could not be assessed due to interference from air-wave reflections and lateral changes in signal penetration depth. However, the sands and gravels appear to extend across the entire southern portion of the DTA, at depths as shallow as 17 ft. Ringing, air-wave reflections and diffractions from powerlines, vehicles, well casings, and metal equipment severly degraded GPR profiles in the northern portion of the DTA; depths computed from reflection times (where visible) were accurate to within 4 ft in this area. The paleochannel deposits are deeper to the north and northeast where DNAPL has apparently pooled (DNAPL was not directly imaged by the GPR, however). Existing hydrogeological models of the DTA will be revised.

  10. Schools Near EM Sites in Kentucky, Ohio Advance to DOE's National Science

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bowl | Department of Energy Schools Near EM Sites in Kentucky, Ohio Advance to DOE's National Science Bowl Schools Near EM Sites in Kentucky, Ohio Advance to DOE's National Science Bowl March 31, 2014 - 12:00pm Addthis Members of Lone Oak Middle School’s winning team at DOE’s 2014 West Kentucky Regional Science Bowl, left to right, David Perriello, Drew Schofield, Ethan Brown, and David Dodd, formulate their answer to a question in the middle school finals Feb. 28 in Paducah, Ky.

  11. Paducah WDA CERCLA Process & Public Involvement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CERCLA Process & Public Involvement Paducah WDA CERCLA Process & Public Involvement The CERCLA process involves stakeholder education and input throughout the life of the project. (click graphic to enlarge) The CERCLA process involves stakeholder education and input throughout the life of the project. (click graphic to enlarge) DOE is committed to fostering meaningful community involvement in environmental remediation decision making at the site. Interactive communications enable the

  12. PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 PPPO Cleanup Projects - Portsmouth, Paducah, & DUF6 Paducah site uses in-ground heating to remove groundwater contamination Paducah site uses in-ground heating to remove groundwater contamination Read more Portsmouth Site shipped plant components to an approved offsite disposal facility Portsmouth Site shipped plant components to an approved offsite disposal facility Read more DUF6 Project converts DUF6 into a more stable

  13. 2013 Annual Planning Summary for the Portsmouth and Paducah Project...

    Office of Environmental Management (EM)

    2014 Annual Workforce Analysis and Staffing Plan Report - Portsmouth Paducah Project Office 2010 Annual Planning Summary for Stanford Linear Accelerator Center Site Office (SLAC)...

  14. NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the site. A portion of the community is interested in real property transfer to help offset job losses by attracting business to the area and using the land and facilities for...

  15. Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous...

    Office of Environmental Management (EM)

    compliance with a temporary-status condition may require the use of a computerized waste inventory management system. The Subtitle D landfill does pose an additional long-term...

  16. Summary - Proposed On-Site Disposal Facility (OSDF) at the Paducah...

    Office of Environmental Management (EM)

    of the existing RCRA Subtitle D landfill, (2) site considerations such as seismic and brown versus green field, (3) the public communication plan, (4) future public use options,...

  17. Paducah Cleanup Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Milestones Paducah Cleanup Milestones The Paducah Site Management Plan sets forth enforceable milestones for cleanup activities. These activities include a series of prioritized cleanup actions, ongoing analysis to support future cleanup decisions, and eventual D&D of the gaseous diffusion plant. FY 2015 - Key Milestones/Outlook Issue Federal Facility Agreement Annual Site Management Plan (D1) Issue Burial Grounds Solid Waste Management Unit 5 and 6 Record of Decision (D1) C-400 -

  18. Paducah Demolition Debris Shipped for Disposition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demolition Debris Shipped for Disposition Paducah Demolition Debris Shipped for Disposition August 27, 2013 - 12:00pm Addthis The first five-car section of demolition debris from the C-340 Metals Plant leaves July 15 from the Paducah site. The first five-car section of demolition debris from the C-340 Metals Plant leaves July 15 from the Paducah site. A P&L locomotive travels near Woodville Road, south of the Paducah site, with the waste shipment in tow. A P&L locomotive travels near

  19. Portsmouth/Paducah Project Office Press Releases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portsmouth/Paducah Project Office Press Releases Portsmouth/Paducah Project Office Press Releases RSS December 24, 2015 DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants LEXINGTON, Ky. (Dec. 24, 2015) - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for Operations of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities at Paducah, Kentucky and Portsmouth, Ohio for a period of up to nine

  20. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Office of Environmental Management (EM)

    | Department of Energy Portsmouth/Paducah Project Office - May 2012 Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012 May 2012 Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program This report provides the results of an independent review of the Department of Energy's (DOE) Headquarters Office of Environmental Management

  1. Top Three Topics and Achievements by Site

    Office of Environmental Management (EM)

    Chairs' Meeting October 20, 2011 Paducah Fully support the DOE Asset Revitalization Initiative Incorporate clean energy technologies at the Paducah site - solar, bio-fuels, clean coal, etc. Develop infrastructure assets at the site including electrical grid Develop infrastructure assets at the site including electrical grid Promote public-private partnerships such as USEC for commercial opportunities at site Local communities and stakeholders are engaged and ready to support this process!

  2. U.S. Department of Energy Awards Paducah Remediation Contract | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Contract U.S. Department of Energy Awards Paducah Remediation Contract December 27, 2005 - 4:56pm Addthis Paducah Remediation Services, LLC wins $191 Million Small Business Contract Competition WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Paducah Remediation Services, LLC (PRS) has been awarded a $191.6 million small business contract to perform environmental remediation and waste management activities at the Department's Paducah Gaseous Diffusion Plant

  3. DOE site facility mgt contracts Internet Posting 5-2-11.xlsx

    Office of Environmental Management (EM)

    6/30/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 Bill Creech 859-219-4044 West Valley Demonstration Project EM West Valley Environmental Svcs 6/29/2007 6/30/2011

  4. Energy Department Selects Deactivation Contractor for Paducah Gaseous Diffusion Plant

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. The U.S. Department of Energy (DOE) today awarded a Task Order under the Nationwide Environmental Management ID/IQ Unrestricted Contract to Fluor Federal Services, Inc. for deactivation activities at the Paducah Gaseous Diffusion Plant (GDP) in Paducah, Kentucky, which is currently leased to the United States Enrichment Corporation (USEC).

  5. Independent Oversight Assessment, Portsmouth/Paducah Project...

    Office of Environmental Management (EM)

    PortsmouthPaducah Project Office - May 2012 Independent Oversight Assessment, PortsmouthPaducah Project Office - May 2012 May 2012 Assessment of the PortsmouthPaducah Project...

  6. Paducah Educational Outreach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community Outreach » Paducah Educational Outreach Paducah Educational Outreach The West Kentucky Regional Science Bowl sponsored by DOE brings teams from all over the region to vie for the opportunity to compete at the National Science Bowl in Washington, D.C. The West Kentucky Regional Science Bowl sponsored by DOE brings teams from all over the region to vie for the opportunity to compete at the National Science Bowl in Washington, D.C. Area students participated in an Eco Fair sponsored by

  7. Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A 10,000-pound cold trap is lifted and boxed in a container for on-site storage at Paducah. A 10,000-pound cold trap is lifted and boxed in a container for on-site storage at ...

  8. Voluntary Protection Program Onsite Review, Infrastructure Support Contract Paducah Gaseous Diffusion Plant- May 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether Infrastructure Support Contract Paducah Gaseous Diffusion Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

  9. Voluntary Protection Program Onsite Review, Infrastructure Support Contract Paducah Gaseous Diffusion Plant- March 2012

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether the Infrastructure Support Contract Paducah Gaseous Diffusion Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

  10. Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities Transfers

    Broader source: Energy.gov [DOE]

    DOE evaluated the potential conveyance (lease, easement, and/or title transfer) of real property that may be determined to be excessed, underutilized or unneeded at the Paducah Gaseous Diffusion Plant (PGDP). After appropriate agency reviews, DOE could transfer PGDP real property to one or more entities for a range of economic development and/or recreational uses. DOE’s potential action is designed to reduce the footprint of the site and the cost for maintenance of the site, providing opportunities for beneficial reuse. DOE prepared this Draft Environmental Assessment (EA) to analyze the potential environmental consequences associated with potential land and facilities transfers.

  11. Heath Middle School Science Students Study Environmental Issue at Paducah

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site | Department of Energy Heath Middle School Science Students Study Environmental Issue at Paducah Site Heath Middle School Science Students Study Environmental Issue at Paducah Site April 1, 2012 - 12:00pm Addthis Mentor Jim Erickson of the LATA Kentucky team shows Heath Middle School sixthgrader Ian Morgan how to use red cabbage to indicate if a watery solution is acidic, basic, or neutral. Mentor Jim Erickson of the LATA Kentucky team shows Heath Middle School sixthgrader Ian Morgan

  12. Portsmouth and Paducah Construction Workers Needs Assessment

    Office of Environmental Management (EM)

    Needs Assessment for Medical Screening of Construction Workers at the Portsmouth and Paducah Gaseous Diffusion Plants Introduction In 1993 the U.S. Congress enacted Section 3162 of the Defense Authorization Act, which directed the Department of Energy (DOE) to initiate programs to evaluate the health of former DOE defense nuclear facility workers. Consistent with the mandate to DOE from Congress, this project implements a notification, health evaluation (including medical screening) and

  13. DOE Site Facility Management Contracts Internet Posting | Department...

    Energy Savers [EERE]

    DOE Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November...

  14. Microsoft PowerPoint - DOE Paducah Site Tour Industry Day - 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Peak Design Power Capacity Power Suppliers Largest Process Motor Water Utilization R-114 Lube Oil Steam Plant Currently High Pressure Fire Water Tank Sanitary Water Tank Number of ...

  15. DOE Seeking Input on Alternative Uses of Nickel Inventory | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    three-dimensional model of the Paducah Site's groundwater system. University of Kentucky College of Design students assembled the model for the Paducah Citizens Advisory Board....

  16. IDAHO SITE TO PROVIDE WASTE TREATMENT FOR OTHER DOE SITES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 7, 2008 IDAHO SITE TO PROVIDE WASTE TREATMENT FOR OTHER DOE SITES Plan won't impact DOE commitment to removing all stored waste from Idaho Site Idaho's Advanced Mixed Waste Treatment Facility offers state of the art waste characterization, treatment and packaging capabilities. Click on image to enlarge The U.S. Department of Energy (DOE) is amending the Record of Decision for the Waste Management Program: Treatment and Storage of Transuranic Waste, originally issued in 1998. The amendment

  17. DOE-ID Twitter Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    what's going on at DOE-Idaho? Follow DOE-ID public affairs supervisor Brad Bugger on Twitter at doeidbug. https:twitter.comdoeidbug Editorial Date May 9, 2911 By Brad Bugger...

  18. Environmental site description for a Uranium Atomic Vapor Laser Isotope Separation (U-AVLIS) production plant at the Paducah Gaseous Diffusion Plant site

    SciTech Connect (OSTI)

    Marmer, G.J.; Dunn, C.P.; Moeller, K.L.; Pfingston, J.M.; Policastro, A.J.; Yuen, C.R.; Cleland, J.H.

    1991-09-01

    Uranium enrichment in the United States has utilized a diffusion process to preferentially enrich the U-235 isotope in the uranium product. The U-AVLIS process is based on electrostatic extraction of photoionized U-235 atoms from an atomic vapor stream created by electron-beam vaporization of uranium metal alloy. The U-235 atoms are ionized when precisely tuned laser light -- of appropriate power, spectral, and temporal characteristics -- illuminates the uranium vapor and selectively photoionizes the U-235 isotope. A programmatic document for use in screening DOE site to locate a U-AVLIS production plant was developed and implemented in two parts. The first part consisted of a series of screening analyses, based on exclusionary and other criteria, that identified a reasonable number of candidate sites. These sites were subjected to a more rigorous and detailed comparative analysis for the purpose of developing a short list of reasonable alternative sites for later environmental examination. This environmental site description (ESD) provides a detailed description of the PGDP site and vicinity suitable for use in an environmental impact statement (EIS). The report is based on existing literature, data collected at the site, and information collected by Argonne National Laboratory (ANL) staff during a site visit. 65 refs., 15 tabs.

  19. Paducah Gaseous Diffusion Plant - GW OU Northwest Plume | Department of

    Office of Environmental Management (EM)

    Energy Gaseous Diffusion Plant - GW OU Northwest Plume Paducah Gaseous Diffusion Plant - GW OU Northwest Plume January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Paducah Gaseous Diffusion Plant, KY Responsible DOE Office: Office of Environmental Management Plume Name: GW OU Northwest Plume Remediation Contractor: LATA Environmental Services of Kentucky, LLC PBS Number: PA-0040 Report Last Updated: 2014

  20. Sampling and Analysis at the Vortec Vitrification Facility in Paducah,

    Office of Scientific and Technical Information (OSTI)

    Kentucky. Semiannual report, November 1, 1996--March 31, 1997 (Technical Report) | SciTech Connect Technical Report: Sampling and Analysis at the Vortec Vitrification Facility in Paducah, Kentucky. Semiannual report, November 1, 1996--March 31, 1997 Citation Details In-Document Search Title: Sampling and Analysis at the Vortec Vitrification Facility in Paducah, Kentucky. Semiannual report, November 1, 1996--March 31, 1997 × You are accessing a document from the Department of Energy's (DOE)

  1. Paducah Gaseous Diffusion Plant - GW OU Southwest Plume | Department of

    Energy Savers [EERE]

    Energy Southwest Plume Paducah Gaseous Diffusion Plant - GW OU Southwest Plume January 1, 2014 - 12:00pm Addthis US Department of Energy Groundwater Database Groundwater Master Report InstallationName, State: Paducah Gaseous Diffusion Plant, KY Responsible DOE Office: Office of Environmental Management Plume Name: GW OW Southwest Plume Remediation Contractor: LATA Environmental Services of Kentucky, LLC PBS Number: PA-0040 Report Last Updated: 2014 Contaminants Halogenated VOCs/SVOCs

  2. Current DOE and OSHA VPP Sites

    Broader source: Energy.gov [DOE]

    Need to know which sites are current DOE-VPP or OSHA VPP Sites? The link, below, will take you to a Voluntary Protection Programs Participant's Association web page where you may search for current...

  3. U.S. Department of Energy Awards Paducah Infrastructure Services Contract |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Infrastructure Services Contract U.S. Department of Energy Awards Paducah Infrastructure Services Contract March 16, 2005 - 10:47am Addthis $39.9 Million Small Business Contract Runs Through March 2010 WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced its award of a $39.9 million small business contract to Swift & Staley Mechanical Contractors, Inc. for infrastructure services activities at the Paducah Gaseous Diffusion Plant in Paducah, Ky. A

  4. DOE - RL Contracts/Procurements - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procurements DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives DOE - RL Contracts/Procurements Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size DOE - RL Contracts/Procurements Located just north of the city of Richland, in the southeastern part of Washington State, the 586-square-mile Hanford Site is managed by the U.S.

  5. Portsmouth, Paducah Project Leaps Past Shipment Milestone, Delivering

    Energy Savers [EERE]

    Economic Benefit to U.S. | Department of Energy Portsmouth, Paducah Project Leaps Past Shipment Milestone, Delivering Economic Benefit to U.S. Portsmouth, Paducah Project Leaps Past Shipment Milestone, Delivering Economic Benefit to U.S. September 1, 2012 - 12:00pm Addthis Pictured here are railcars carrying tanks of hydrofluoric acid for shipment from the Portsmouth site to Solvay Fluorides for industrial use. Pictured here are railcars carrying tanks of hydrofluoric acid for shipment from

  6. Seismic issues at the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Fricke, K.E. )

    1989-11-01

    A seismic expert workshop was held at the Paducah Gaseous Diffusion Plant (PGDP) on March 13--15, 1989. the PGDP is operated by Martin Marietta Energy Systems, Inc. for the United States Department of Energy (DOE). During the last twenty years the design criteria for natural phenomenon hazards has steadily become more demanding at all of the DOE Oak Ridge Operations (ORO) sites. The purpose of the two-day workshop was to review the seismic vulnerability issues of the PGDP facilities. Participants to the workshop included recognized experts in the fields of seismic engineering, seismology and geosciences, and probabilistic analysis, along with engineers and other personnel from Energy Systems. A complete list of the workshop participants is included in the front of this report. 29 refs.

  7. Complexity of Groundwater Contaminants at DOE Sites

    SciTech Connect (OSTI)

    Hazen, T.C.; Faybishenko, B.; Jordan, P.

    2010-12-03

    The U.S. Department of Energy (DOE) is responsible for the remediation and long-term stewardship of one of the world's largest groundwater contamination portfolios, with a significant number of plumes containing various contaminants, and considerable total mass and activity. As of 1999, the DOE's Office of Environmental Management was responsible for remediation, waste management, or nuclear materials and facility stabilization at 144 sites in 31 states and one U.S. territory, out of which 109 sites were expected to require long-term stewardship. Currently, 19 DOE sites are on the National Priority List. The total number of contaminated plumes on DOE lands is estimated to be 10,000. However, a significant number of DOE sites have not yet been fully characterized. The most prevalent contaminated media are groundwater and soil, although contaminated sediment, sludge, and surface water also are present. Groundwater, soil, and sediment contamination are present at 72% of all DOE sites. A proper characterization of the contaminant inventory at DOE sites is critical for accomplishing one of the primary DOE missions -- planning basic research to understand the complex physical, chemical, and biological properties of contaminated sites. Note that the definitions of the terms 'site' and 'facility' may differ from one publication to another. In this report, the terms 'site,' 'facility' or 'installation' are used to identify a contiguous land area within the borders of a property, which may contain more than one plume. The term 'plume' is used here to indicate an individual area of contamination, which can be small or large. Even though several publications and databases contain information on groundwater contamination and remediation technologies, no statistical analyses of the contaminant inventory at DOE sites has been prepared since the 1992 report by Riley and Zachara. The DOE Groundwater Data Base (GWD) presents data as of 2003 for 221 groundwater plumes at 60 DOE sites and facilities. Note that Riley and Zachara analyzed the data from only 18 sites/facilities including 91 plumes. In this paper, we present the results of statistical analyses of the data in the GWD as guidance for planning future basic and applied research of groundwater contaminants within the DOE complex. Our analyses include the evaluation of a frequency and ranking of specific contaminants and contaminant groups, contaminant concentrations/activities and total contaminant masses and activities. We also compared the results from analyses of the GWD with those from the 1992 report by Riley and Zachara. The difference between our results and those summarized in the 1992 report by Riley and Zachara could be caused by not only additional releases, but also by the use of modern site characterization methods, which more accurately reveal the extent of groundwater contamination. Contaminated sites within the DOE complex are located in all major geographic regions of the United States, with highly variable geologic, hydrogeologic, soil, and climatic conditions. We assume that the information from the 60 DOE sites included in the GWD are representative for the whole DOE complex. These 60 sites include the major DOE sites and facilities, such as Rocky Flats Environmental Technology Site, Colorado; Idaho National Laboratory, Idaho; Savannah River Site, South Carolina; Oak Ridge Reservation, Tennessee; and Hanford Reservation, Washington. These five sites alone ccount for 71% of the value of the remediation work.

  8. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah PDF icon Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and ...

  9. Energy Department Selects Deactivation Contractor for Paducah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deactivation Contractor for Paducah Gaseous Diffusion Plant Energy Department Selects Deactivation Contractor for Paducah Gaseous Diffusion Plant July 22, 2014 - 5:48pm Addthis...

  10. Paducah Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Needs Assessment May 2003 This Needs Assessment for former Paducah Gaseous Diffusion Plant construction workers was developed for the purpose of collecting existing...

  11. Post-Closure Benefits: DOE Complex vs Closure Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Closure Sites Post-Closure Benefits: DOE Complex vs Closure Sites Status of Contractor Pension and PRB Benefit Programs - September 30, 2013 DOE Wide Closure Sites Defined Benefit...

  12. DOE Human Resources Management Division - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs DOE Human Resources Management Division DOE Employment Recognition and Awards Program Federal Employees Union (AFGE Local 788) Work Schedules / Pay and Leave Benefits and Services EEO & Diversity Contact Us DOE Human Resources Management Division Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Richland Operations Office / Office of River Protection The Human Resources

  13. DOE Site Facility Management Contracts Internet Posting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November 2015.pdf More Documents & Publications DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE site facility mgt contracts Internet Posting 5-2-11.xlsx DOE Facility Management Contracts

  14. DOE Issues Final Site-Wide Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site...

  15. Erosion Control and Revegetation at DOE's Lowman Disposal Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Erosion Control and Revegetation at DOE's Lowman Disposal Site, Lowman, Idaho Erosion Control and Revegetation at DOE's Lowman Disposal Site, Lowman, Idaho Erosion Control and ...

  16. Reassessment of liquefaction potential and estimation of earthquake- induced settlements at Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect (OSTI)

    Sykora, D.W.; Yule, D.E.

    1996-04-01

    This report documents a reassessment of liquefaction potential and estimation of earthquake-induced settlements for the U.S. Department of Energy (DOE), Paducah Gaseous Diffusion Plant (PGDP), located southwest of Paducah, KY. The U.S. Army Engineer Waterways Experiment Station (WES) was authorized to conduct this study from FY91 to FY94 by the DOE, Oak Ridge Operations (ORO), Oak Ridge, TN, through Inter- Agency Agreement (IAG) No. DE-AI05-91OR21971. The study was conducted under the Gaseous Diffusion Plant Safety Analysis Report (GDP SAR) Program.

  17. DOE - NNSA/NFO -- Site Map

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SiteMap NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office NATIONAL SECURITY ENVIRONMENTAL PROGRAMS National Security Stockpile Stewardship • BEEF • CEF • DAF • JASPER • Subcritical Experiments/U1a • Test Readiness Homeland Security • National Emergency Response • FRMAC - Program Support • NEST • NPTEC • Rad/NucCTEC First Responder Training • Registration Department of Energy - Cyber Incident Response Capability (DOE-CIRC) OPSEC Environmental Programs • Groundwater

  18. U.S. Department of Energy Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy (DOE) needs to deactivate and demolish structural components on 13 support facilities at the Paducah Site. The support buildings are aging and are no longer needed. The 13 support buildings are as follows: an office building (C-212), security structures (C-212-A, C-215, C-216, and C-229), storage facilities (C-601-D, C-616-G, C-746-A, C-746-B, and C-746-M), and ancillary facilities (C-408 Truck Scale, C-633-6 Filter Building, and C-801 Bus Shelter). Facilities would be

  19. Sites Pending Transfer to LM | Department of Energy

    Office of Legacy Management (LM)

    Site Iowa Middletown Site Kentucky Paducah Site Massachusetts Attleboro Site Maryland Curtis Bay Site Missouri Berkeley Site Berkeley Site Vicinity Properties Hazelwood Site St....

  20. Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation

    Office of Environmental Management (EM)

    427 Rev. 1 U.S. Department of Energy Office of Environmental Management Paducah Gaseous Diffusion Plant (PGDP) Review Report: Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation, PGDP, Paducah Kentucky 15 August 2007 Paducah Gaseous Diffusion Plant (PGDP) Paducah KY Paducah Gaseous Diffusion Plant (PGDP) Paducah KY Prepared for: Office of Groundwater and Soil Remediation Office of Engineering and Technology Review Report - C-400 Thermal Remediation PGDP

  1. Paducah Site End State Vision

    Broader source: Energy.gov [DOE]

    The End State Vision for the PGDP is a tool for communicating the PGDP’s end state vision to stakeholders. This document provides information that can be used to establish clearly articulated and...

  2. U.S. Department of Energy Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    modify and/or upgrade existing safety equipment, components, and/or systems and install new equipment, components, and/or systems at its facilities to maintain and/or enhance workplace safety and habitability. The proposed actions would take place at DOE-owned facilities at the DOE Portsmouth Gaseous Diffusion Plant (PORTS) at Piketon, Ohio and the Paducah Gaseous Diffusion Plant (PGDP) at Paducah, Kentucky. Number and Title of the Categorical Exclusions Applied: 10 CFR 1021, Appendix B to

  3. Paducah Events | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    July 2015 < prev next > Sun Mon Tue Wed Thu Fri Sat 28 29 30 1 2 3 4 Public Comment Period - Paducah Draft Environmental Assessment for Potential Land and Facilities Transfers...

  4. Paducah News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    turns an eight-foot-diameter auger performing deep-soil mixing at the Paducah Gaseous Diffusion Plant's southwest groundwater plume. More than 260 borings are being made to a depth...

  5. Portsmouth/Paducah Employees, Contractors Donate 17,500 Pounds of Food |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Portsmouth/Paducah Employees, Contractors Donate 17,500 Pounds of Food Portsmouth/Paducah Employees, Contractors Donate 17,500 Pounds of Food September 30, 2014 - 12:00pm Addthis EM and contractor staff of the Portsmouth Gaseous Diffusion Plant site prepare shipments of food to local pantries as part of the Portsmouth/Paducah Project Office’s 2014 Feds Feed Families effort. EM and contractor staff of the Portsmouth Gaseous Diffusion Plant site prepare shipments of

  6. U.S. Department of Energy Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    components on 13 support facilities at the Paducah Site. The support buildings are aging and are no longer needed. The 13 support buildings are as follows: an office building...

  7. Categorical Exclusion Determinations: Portsmouth Paducah Project Office |

    Office of Environmental Management (EM)

    Department of Energy Portsmouth Paducah Project Office Categorical Exclusion Determinations: Portsmouth Paducah Project Office Categorical Exclusion Determinations issued by Portsmouth Paducah Project Office. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2012 CX-009253: Categorical Exclusion Determination Optimization of Electrical Power at the Portsmouth Gaseous Diffusion Facility CX(s) Applied: B4.6, B4.11 Date: 08/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office May 9,

  8. Proposed sale of radioactively contaminated nickel ingots located at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1995-10-01

    The U.S. Department of Energy (DOE) proposes to sell 8,500 radioactively contaminated nickel ingots (9.350 short tons), currently in open storage at the Paducah Gaseous Diffusion Plant (PGDP), to Scientific Ecology Group, Inc. (SEG) for decontamination and resale on the international market. SEG would take ownership of the ingots when they are loaded for transport by truck to its facility in Oak Ridge, Tennessee. SEG would receive approximately 200 short tons per month over approximately 48 months (an average of 180 ingots per month). The nickel decontamination process specified in SEG`s technical proposal is considered the best available technology and has been demonstrated in prototype at SEG. The resultant metal for resale would have contamination levels between 0.3 and 20 becquerel per gram (Bq/g). The health hazards associated with release of the decontaminated nickel are minimal. The activity concentration of the end product would be further reduced when the nickel is combined with other metals to make stainless steel. Low-level radioactive waste from the SEG decontamination process, estimated to be approximately 382 m{sup 3} (12,730 ft), would be shipped to a licensed commercial or DOE disposal facility. If the waste were packaged in 0.23 m{sup 3}-(7.5 ft{sup 3}-) capacity drums, approximately 1,500 to 1,900 drums would be transported over the 48-month contract period. Impacts from the construction of decontamination facilities and the selected site are minimal.

  9. DOE - NNSA/NFO -- Rate our Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rate our Site U.S. DOE/NNSA - Nevada Field Office Rate our website The Nevada Field Office is committed to providing high-quality products and services that meet your needs. Your participation in our customer satisfaction survey will help us achieve this goal. NFO would appreciate your taking the time to complete this survey. Responses are confidential. The survey should take approximately 15 minutes or 1 minute per question. You do not have to answers all the questions. How did you feel working

  10. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows.

  11. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....

  12. DOE Annual Site Environmental Reports (ASER) | Department of Energy

    Energy Savers [EERE]

    Services » Environment » Radiation Protection of the Public and the Environment » DOE Annual Site Environmental Reports (ASER) DOE Annual Site Environmental Reports (ASER) ASERs are required by DOE O 231.1B. The ASERs provide important information needed by site managers and DOE Headquarters to assess field environmental program performance, site-wide environmental monitoring and surveillance effectiveness, and confirm compliance with environmental standards and requirements. They are also

  13. DOE ORP Purchase Card Buyers - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE ORP Purchase Card Buyers Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers Contact ORP DOE ORP Purchase Card Buyers Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Untitled Document DOE ORP PURCHASE CARD HOLDERS

  14. DOE-ORP Contracting Officers - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ORP Contracting Officers Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers Contact ORP DOE-ORP Contracting Officers Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size ORP CONTRACTING OFFICER AUTHORITIES

  15. DOE - Office of Legacy Management -- Project Gnome Site - NM 12

    Office of Legacy Management (LM)

    Gnome Site - NM 12 FUSRAP Considered Sites Site: Project Gnome Site (NM.12) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gnome-Coach, New Mexico, Site Documents Related to Project Gnome Site Conditional Certificate of Completion. Attached letter from New Mexico Environment Department of DOE dated September 25, 2014. Fact Sheet

  16. DOE - Office of Legacy Management -- SiteA

    Office of Legacy Management (LM)

    Illinois Site A/Plot M, Illinois, Decommissioned Reactor Site A D&D Program Site sitea_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Site A/Plot M Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires

  17. DOE Issues Request for Proposals for Hanford Site Occupational Medical

    Office of Environmental Management (EM)

    Services | Department of Energy Proposals for Hanford Site Occupational Medical Services DOE Issues Request for Proposals for Hanford Site Occupational Medical Services November 14, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171 RICHLAND, Wash. - The Department of Energy (DOE) today issued a Request for Proposals (RFP) for an Occupational Medical Services contract at the Hanford Site. The solicitation is for a small-business contractor to perform

  18. Liquefaction Triggering Evaluations at DOE Sites - An Update | Department

    Office of Environmental Management (EM)

    of Energy Liquefaction Triggering Evaluations at DOE Sites - An Update Liquefaction Triggering Evaluations at DOE Sites - An Update Liquefaction Triggering Evaluations at DOE Sites - An Update 2014 Natural Phenomena Hazards Meeting October 21-22, 2014 Germantown, Maryland Michael R. Lewis, Bechtel Corporation Michael D. Boone, Bechtel Corporation Rucker J. Williams, Savannah River Nuclear Solutions, LLC Brent Gutierrez, U.S. Department of Energy, Savannah River Site PDF icon Liquefaction

  19. Paducah Events | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    August 2015 < prev next > Sun Mon Tue Wed Thu Fri Sat 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Paducah CAB Board meeting -...

  20. Paducah Events | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2015 < prev next > Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Paducah CAB Board and Subcommittees - November 6:00PM to 8:00PM CST 22...

  1. Second site-wide five-year review of cleanup at DOE?s Idaho...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOEs Idaho site...

  2. Contractor Fee Payments - Portsmouth Paducah Project Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Portsmouth Paducah Project Office Contractor Fee Payments - Portsmouth Paducah Project Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Portsmouth Paducah Project Office on these charts. PDF icon Paducah Remediation - LATA of Kentucky PDF icon Paducah Infrastructure Support PDF icon Portsmouth D&D PDF icon Operation of DUF6 PDF icon Portsmouth Facility Support Services PDF icon Paducah Deactivation

  3. Portsmouth Paducah Project Office (PPPO) Organization | Department of

    Energy Savers [EERE]

    Energy Paducah Project Office (PPPO) Organization Portsmouth Paducah Project Office (PPPO) Organization Portsmouth Paducah Project Office (PPPO) Organization PDF icon Printable file for PPPO Organization Chart More Documents & Publications Independent Oversight Assessment, Portsmouth/Paducah Project Office - May 2012 Independent Activity Report, Portsmouth Gaseous Diffusion Plant - August 2011 2013 Annual Planning Summary for the Portsmouth and Paducah Project Office PORTSMOUTH/PADUCAH

  4. Independent Activity Report, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PortsmouthPaducah Project Office - April 2013 Independent Activity Report, PortsmouthPaducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the...

  5. Enterprise Assessments Targeted Review of the Paducah Depleted...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Paducah Depleted Uranium Hexafluoride Conversion Facility Fire Protection Program - September 2015 Enterprise Assessments Targeted Review of the Paducah Depleted...

  6. EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    27: Paducah Gaseous Diffusion Plant Potential Land and Facilities Transfers; McCracken County, Kentucky EA-1927: Paducah Gaseous Diffusion Plant Potential Land and Facilities...

  7. DOE-ORP Prime Contracts - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts BNI Contract BNI Contract Modifications ATL Contract ATL Contract Modifications WRPS Contract WRPS Contract Modifications CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers

  8. Paducah WDA Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis Paducah WDA Analysis The CERCLA Waste Disposal Alternatives are evaluated based on Threshold, Balancing, and Modifying Criteria. Threshold Criteria assess protection of people and the environment and compliance with regulations. Balancing Criteria look at implementation, short and long-term effectiveness, risk reduction, and cost. Modifying Criteria evaluate state and community acceptance in the Proposed Plan where formal public comments are considered. Paducah WDA criteria Paducah WDA

  9. Contractor Employee Assistance at DOE Contractor Sites

    Broader source: Energy.gov [DOE]

    The DOE Employee Assistance Program (EAP) for DOE contractor and subcontractor workers complements the DOE medical and psychological evaluations and surveillance program. The EAP provides contractor workers who are experiencing personal problems with an opportunity to receive appropriate treatment and support. The goal of the EAP is to provide a conduit through which the individual can resolve personal and workplace problems. The HSS EAP Manager aids the DOE contracting organizations to maintain a healthy and productive workforce.

  10. DOE RL Contracting Officer Representatives - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Officer Representatives DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives DOE RL Contracting Officer Representatives Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size CO/COR Contract Number Company Acronym Limitations CAROSINO, ROBERT M DE-AC06-08RL14788 CPRC DE-AC06-08RL14788, CH2M HILL PLATEAU REMEDIATION COMPANY (CHPRC),

  11. Lessons learned with ISO 14001 at DOE sites

    SciTech Connect (OSTI)

    Wilkinson, C. H., LLNL

    1998-03-01

    ISO 14001 is the international standard for environmental management systems (EMS). The standard applies the `plan, do, check, act` management system model to assure that the environmental impacts of operations are fully considered in planning and facility operations. ISO 14001 has grown in popularity in both the public and the private sector and has seen increasing utility within the U.S. Department of Energy (DOE). While there is no final DOE policy or requirement for ISO 14001 EMS implementation, ISO 14001 commands an active presence at many DOE sites. In general, the impetus for ISO 14001 in the DOE complex has been either an initiative by site management contractors to improve performance, or an actual requirement in the new management contracts for the sites. Several DOE sites now are committed to implement EMS`s in conformance with ISO 14001: Brookhaven National Laboratory (BNL), Hanford, Idaho National Engineering and Environmental Laboratory (INEEL), Kansas City Plant, Nevada Test Site, Savannah River Site (SRS), Waste Isolation Pilot Project (WIPP), West Valley. Several other DOE sites are expected to proceed in the near future with an EMS consistent with ISO 14001. However, not all sites are proceeding with an ISO 14001 EMS based on individual site business considerations. This paper describes the status of EMS implementation at these sites and identifies lessons learned that may be of use to other DOE sites.

  12. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    Ohio Mound, Ohio, Site A CERCLA and/or RCRA Site Mound2014 Remediation of the Mound, Ohio, Site was conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The site long-term monitoring responsibility transferred to the Office of Legacy Management(LM) in 2010 and requires operation and maintenance of a pump and treatment system, groundwater monitoring, institutional controls monitoring, records-related activities, and stakeholder support.

  13. Safety Oversight of Decommissioning Activities at DOE Nuclear Sites

    SciTech Connect (OSTI)

    Zull, Lawrence M.; Yeniscavich, William

    2008-01-15

    The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive material contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.

  14. Paducah Regulatory Approach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Remediation » Paducah Regulatory Approach Paducah Regulatory Approach Past uranium enrichment operations and support activities generated hazardous, radioactive, mixed (both hazardous and radioactive), and non-chemical (sanitary) waste. Past operations also resulted in soil, groundwater, and surface water contamination. Environmental investigations have been conducted since the 1980s to understand the extent of contamination. Following environmental investigations of the entire

  15. DOE Issues Draft Request for Proposals for Hanford Site Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce | Department of Energy Draft Request for Proposals for Hanford Site Occupational Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce DOE Issues Draft Request for Proposals for Hanford Site Occupational Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce July 19, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE Geoffrey.Tyree@rl..doe.gov

  16. Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed; Report Now Available Online | Department of Energy Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE)

  17. Paducah Gaseous Diffusion Plant Environmental report for 1990

    SciTech Connect (OSTI)

    Counce-Brown, D.

    1991-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Site Environmental Report for 1990, is published annually. It reflects the results of a comprehensive, year-round program to monitor the impact of operations at Paducah Gaseous Diffusion Plant (PGDP) on the area's groundwater and surface waters, soil, air quality, vegetation, and wildlife. In addition, an assessment of the effect of PGDP effluents on the resident human population is made. PGDP's overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, to reduce the formation of waste, and to minimize hazardous waste by substitution of materials.

  18. DOE - NNSA/NFO -- Nevada National Security Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Nevada National Security Site Photograph of NNSS A unique national resource, the Nevada National Security Site is a massive outdoor laboratory and national experimental center that cannot be duplicated. Larger than the state of Rhode Island, approximately 1,375 square miles, the Nevada National Security Site is one of the largest restricted access areas in the United States. The remote site is surrounded by thousands of

  19. DOE Issues Salt Waste Determination for the Savannah River Site |

    Energy Savers [EERE]

    Department of Energy Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued the waste determination for the treatment and stabilization of low activity salt-waste at the Savannah River Site allowing for significant reductions in environmental and health risks posed by the material. Stored in forty-nine underground tanks,

  20. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    Ohio Mound, Ohio, Site Site Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Annual Institutional Controls Report Community Involvement Plan Long-Term Surveillance and Maintenance Plan Operations and Maintenance Plan Internal Links Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Records External Links Mound Development Corporation (MDC) Ohio Environmental Protection Agency U.S. Environmental Protection

  1. Remediation of DOE hazardous waste sites: Planning and integration requirements

    SciTech Connect (OSTI)

    Geffen, C.A.; Garrett, B.A.; Cowan, C.E.; Siegel, M.R.; Keller, J.F. )

    1989-09-01

    The US Department of Energy (DOE) is faced with a immense challenge in effectively implementing a program to mitigate and manage the environmental impacts created by current operations and from past activities at its facilities. The current regulatory framework and public interest in the environmental arena have made operating DOE facilities in an environmentally responsible manner a compelling priority. This paper provides information on the results of a project funded by DOE to obtain a better understanding of the regulatory and institutional drivers in the hazardous waste market and the costs and timeframes required for remediation activities. Few realize that before remediating a hazardous waste site, a comprehensive planning process must be conducted to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. The US Environmental Protection Agency (EPA) and others have found that it may take up to 7 years to complete the planning process at an average cost of $1.0 million per site. While cost information is not yet available for DOE sites, discussions with hazardous waste consulting firms indicate that average characterization and assessment costs will be 5 to 10 times this amount for DOE sites. The higher costs are expected because of the additional administrative requirements placed on DOE sites, the need to handle mixed wastes, the amount and extent of contamination at many of these sites, and the visibility of the sites. 15 refs., 1 fig., 2 tabs.

  2. DOE Awards Hanford Site Occupational Medical Services Contract | Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Hanford Site Occupational Medical Services Contract DOE Awards Hanford Site Occupational Medical Services Contract June 8, 2012 - 12:00pm Addthis Media Contact Cameron Hardy 509-308-4947 Cameron.hardy@rl.gov Cincinnati - The U.S. Department of Energy (DOE) announced today that HPM Corporation, of Kennewick, Washington has been awarded an estimated $99 million contract to provide Occupational Medical Services at the DOE Hanford Site. HPM is a certified minority-owned, women-owned

  3. DOE - NNSA/NFO -- Photo Library Nevada National Security Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Library > Nevada National Security Site NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Nevada National Security Site A unique national resource, the Nevada National Security Site is a massive outdoor laboratory and national experimental center that cannot be duplicated. Larger than the state of Rhode Island, approximately 1,375 square miles, the NTS is one of the largest restricted access areas in the United States. The remote site is surrounded by thousands of

  4. DOE, Stoller Work to Understand Environment at INL Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE, Stoller Work to Understand Environment at INL Site The U.S. Department of Energy is responsible for understanding and estimating future impacts from our mission at the INL Site. To accomplish this we must have adequate knowledge of the plants and animals on the Site. DOE also has an obligation to be a good neighbor to the people and businesses that may be affected by our presence in Eastern Idaho. Elk became resident on the site in the 1980s. Since that time, there have been claims of elk

  5. DOE Awards Small Business Contract for Site Characterization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work in Los Alamos, New Mexico DOE Awards Small Business Contract for Site Characterization and Erosion Control Work in Los Alamos, New Mexico September 30, 2013 - 12:00pm ...

  6. DOE - Office of Legacy Management -- Maywood Site - NJ 10

    Office of Legacy Management (LM)

    of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. Aerial Photograph of the Maywood, New Jersey, Site NJ.10-1 - DOE Letter;...

  7. Portsmouth/Paducah Project Office

    Energy Savers [EERE]

    8 2013 PPPO-03-1811464-13 SUBMITTAL OF THE PHASE II ARCHAEOLOGICAL SITE EVALUATION REPORT FOR FIVE SITES AT THE PORTSMOUTH GASEOUS DIFFUSION PLANT, PIKETON, PIKE COUNTY, OHIO Enclosed for your information is the report Phase II Archaeological Site Evaluations of 33PK184, 33PK193, 33PK194, 33PK195, and 33PK197, Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Pike County, Ohio. In 2002, the Department of Energy (DOE) submitted the Phase I Archaeological Survey of the Portsmouth Gaseous

  8. DOE - NETL Gasification Technology Test Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    technology test sites Once a technology is ready to be tested at pilot or commercial scale, the cost of building a test facility becomes significant -- often beyond the funding provided for any one project. It then becomes critical to test the technology at a pre-existing facility willing to test experimental technologies. Not surprisingly, most commercial facilities are hesitant to interfere with their operations to experiment, but others, with a view towards the future, welcome promising

  9. DOE NNSA Site Facility Management Contracts - MASTER.xlsx

    Energy Savers [EERE]

    Site Facility Management Contracts November 2015 Contract Title Program Contractor Composition of Contractor Contract Number Contract Type Business Model FY Competed Award Date Current Contract End date Options/Award Term Remaining Ultimate Potential Contract End Date (includes all potential award term and option years) DOE Site Procurement Director DOE Contracting Officer National Renewable Energy Laboratory (NREL) EERE Alliance for Sustainable Energy (ASE) Battelle Memorial Institute,

  10. DOE Standard Natural Phenomena Hazards Site Characterization Criteria

    Office of Environmental Management (EM)

    2-94 March 1994 Change Notice No. 1 January 1996 Reaffirmed with Errata April 2002 DOE STANDARD NATURAL PHENOMENA HAZARDS SITE CHARACTERIZATION CRITERIA U.S. Department of Energy AREA FACR Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Environment Safety and Health Technical Information Services, U.S. Department of

  11. Plan Approved for Waste Disposition at DOE's Portsmouth Site | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Plan Approved for Waste Disposition at DOE's Portsmouth Site Plan Approved for Waste Disposition at DOE's Portsmouth Site July 7, 2015 - 3:01pm Addthis PIKETON, Ohio - The Ohio Environmental Protection Agency (Ohio EPA) and the U.S. Department of Energy (DOE) have agreed upon a plan for the disposition of more than two million cubic yards of waste that would be generated from the decontamination and decommissioning (D&D) of the Portsmouth Gaseous Diffusion Plant in Piketon,

  12. DOE Awards Small Business Contract for Site Characterization and Erosion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Work in Los Alamos, New Mexico | Department of Energy Site Characterization and Erosion Control Work in Los Alamos, New Mexico DOE Awards Small Business Contract for Site Characterization and Erosion Control Work in Los Alamos, New Mexico September 30, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a new contract to CTI & Associates, of Wixom, MI. CTI is a small business. The

  13. Effluent emissions monitoring at the DOE Hanford Site

    SciTech Connect (OSTI)

    Vance, L.W.

    1993-05-01

    There are numerous regulatory requirements controlling the effluent emissions monitoring at a U.S. Department of Energy site. This paper defines how these regulatory effluent emissions monitoring requirements and the Quality Assurance oversight of these requirements were implemented by Westinghouse Hanford Company, the operations contractor, at the DOE Hanford Site.

  14. DOE - NNSA/NFO -- Nevada National Security Site Tours

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada National Security Site Tours NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photograph of Nevada National Security Site Tour The Nevada Field Office provides free general interest tours of the Nevada National Security Site on a monthly basis. Groups, civic or technical organizations, and private clubs may request specially-arranged tours (minimum of 25 people) by calling 702-295-0944. Below you will find information on tour logistics, points of interest on the tour,

  15. Paducah Cleanup Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope Paducah Cleanup Scope This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. The overall environmental cleanup strategy at Paducah is based on taking near-term actions to

  16. Portsmouth/Paducah Project Office

    Energy Savers [EERE]

    '1017 Majestic Drive, Suite 200 Lexington, Kentucky 4051 3 (859) 21e-4000 JUN 3 0 2015 Ms. Maria Galanti Site Coordinator Ohio Environmental Protection Agency Southeast District Office 2195 Front Street Logan, Ohio 43138 Dear Ms. Galanti: PPPO-O3-3018616-15 FINAL RECORD OF DECISION FOR THE SITE.WIDE \ryASTE DISPOSITION EVALUATION PROJECT AT THE PORTSMOUTH GASEOUS DIFFUSION PLANT (DOE/PPPO/03-0s 13&D2) References: 1. Letter from W. Murphie to M. Galanti, "Record of Decision for the

  17. Ms. Judy Clayton, Chair Paducah Citizens Advisory Board EHI Consultant...

    Office of Environmental Management (EM)

    0 Ms. Judy Clayton, Chair Paducah Citizens Advisory Board EHI Consultants, Inc. 1 1 1 Memorial Drive Paducah, Kentucky 4200 1 Dear Ms. Clayton: Thank you for your recent letter...

  18. DOE Awards Hanford Site Law Enforcement Contract to Benton County

    Broader source: Energy.gov [DOE]

    RICHLAND, WASH. – The U.S. Department of Energy (DOE) today awarded a contract to the Benton County Sheriff’s Office in Kennewick, Wash., to provide law enforcement services at the DOE Hanford Site. The contract has a five-year period of performance, consisting of a one-year base period, with four one-year option periods and an approximate total value of $5 million.

  19. Darwin: The Third DOE ARM TWP ARCS Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Darwin: The Third DOE ARM TWP ARCS Site W. E. Clements and L. Jones Los Alamos National Laboratory, Los Alamos, New Mexico T. Baldwin Special Services Unit Australian Bureau of Meteorology Melbourne, Australia K. Nitschke South Pacific Regional Environment Programme Apia, Samoa Introduction The U.S. Department of Energy's (DOE's) Atmospheric Radiation Measurement (ARM) Program began operations in its Tropical Western Pacific (TWP) locale in October 1996 when the first Atmospheric Radiation and

  20. Paducah Area Students See Opportunities in STEM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area Students See Opportunities in STEM Paducah Area Students See Opportunities in STEM May 28, 2015 - 12:00pm Addthis Darryl Pea of Fluor Paducah Deactivation Project demonstrates use of a wind-speed meter to a class at Carlisle County Middle School. Darryl Pea of Fluor Paducah Deactivation Project demonstrates use of a wind-speed meter to a class at Carlisle County Middle School. PADUCAH, Ky. - Encouraging student interest in pursuing careers in science, technology, engineering, and math

  1. Business Leaders Learn About Paducah Deactivation Project | Department of

    Energy Savers [EERE]

    Energy Business Leaders Learn About Paducah Deactivation Project Business Leaders Learn About Paducah Deactivation Project April 29, 2015 - 12:00pm Addthis Scott Germain, Fluor Federal Services’ Paducah Deactivation Project support and integration manager, illustrates the magnitude of the display cell in one of the process facilities. Scott Germain, Fluor Federal Services' Paducah Deactivation Project support and integration manager, illustrates the magnitude of the display cell in one

  2. Union job fight boiling at DOE cleanup sites

    SciTech Connect (OSTI)

    Setzer, S.W.

    1993-11-15

    The US DOE is facing a growing jurisdictional dispute over which unions will perform the majority of clean-up work at its facilities. Unions affiliated with the AFL-CIO Metal Trades Council representing operations employees at the sites believe they have a fundamental right to work. Unions in the AFL-CIO's Building and Construction Trades Dept. insist that they have a clear mandate under federal labor law and the Davis-Bacon Act. The issue has heated up in recent weeks at the policy level and is boiling in a contentious dispute at DOE's Fernald site in Ohio.

  3. DOE Announces Webinars on Geography of Alternative Fuels, Wind Siting

    Energy Savers [EERE]

    Considerations, and More | Department of Energy Geography of Alternative Fuels, Wind Siting Considerations, and More DOE Announces Webinars on Geography of Alternative Fuels, Wind Siting Considerations, and More February 12, 2015 - 3:34pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the clean energy workforce. Webinars are free; however, advanced registration is typically

  4. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Briefs NTS Public Tours Factsheets Speakers Bureau To Your Health Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library> SiteLines U.S. DOE/NNSA - Nevada Site Office May/June 2008 - Issue 131 A publication for all members of the NNSA/NSO family Criticality Experiments Facility Construction Passes Halfway

  5. DOE Idaho site reaches 20-year cleanup milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major

  6. DOE/NV/11718--514 Nevada Test Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    514 Nevada Test Site / 2000 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site February 2001 Post Office Box 98521 Las Vegas, NV 89193-8521 Prepared by: Bechtel Nevada 95 U.S. Department of Energy Nevada Operations Office Prepared for: DISCLAIMER Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the

  7. DOE - NNSA/NFO -- Nevada National Security Site History

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site History NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Nevada National Security Site History Photo of NTS Following the Trinity test and the bombings of Hiroshima and Nagasaki, military officials still knew very little about the effects, especially on naval targets, of nuclear weapons. Accordingly, the Joint Chiefs of Staff requested and received Presidential approval to conduct a test series during the summer of 1946. The test series, named Crossroads, was conducted at

  8. DOE Announces Webinars on Overcoming Wind Siting Challenges, Benchmarking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Transparency, and More | Department of Energy Overcoming Wind Siting Challenges, Benchmarking and Transparency, and More DOE Announces Webinars on Overcoming Wind Siting Challenges, Benchmarking and Transparency, and More June 17, 2015 - 8:38am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the clean energy workforce. Webinars are free; however, advanced registration is

  9. DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and security; environment, safety, health and quality (ESH&Q) program; and training ... Addthis Related Articles DOE Issues Final Request for Proposal for Paducah Gaseous ...

  10. DOE Issues Final Request for Proposal for Portsmouth Gaseous...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and security; environment, safety, health and quality program; and training services. ... Addthis Related Articles DOE Issues Final Request for Proposal for Paducah Gaseous ...

  11. Microsoft Word - DOE News Release-DOE Completes Cleanup at New York California Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Completes Cleanup at New York, California Sites Recovery Act funds accelerate cleanup; support job creation and footprint reduction WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18 th and 19 th sites to be completely cleaned of legacy waste. This

  12. DOE/NV/11718--1080 Nevada Test Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1080 Nevada Test Site Environmental Report 2004 National Nuclear Security Administration Strengthening national security through engineering and operational excellence Bechtel Nevada Disclaimer Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors.

  13. DOE/NV/11718--1080 Nevada Test Site

    National Nuclear Security Administration (NNSA)

    080 Nevada Test Site Environmental Report 2004 National Nuclear Security Administration Strengthening national security through engineering and operational excellence Bechtel Nevada Disclaimer Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors.

  14. DOE - NNSA/NSO -- SiteLines - Issue 144

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office July/August 2010 - Issue 144 A publication for all members of the NNSA/NSO family RNCTEC One Year Later: Mission Growth and Expansion It was one year ago that the National Nuclear Security Administration/ Nevada Site Office (NNSA/NSO) completed the start-up of the Radiological/Nuclear Countermeasures Test and Evaluation Complex (RNCTEC)

  15. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Face-to-Face Calendar NTS Public Tours Factsheets Speakers Bureau To Your Health Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office August/September 2007 - Issue 127 A publication for all members of the NNSA/NSO family New Test Site is

  16. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Calendar NTS Public Tours Factsheets Speakers Bureau Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office December 2007/January 2008 - Issue 129 A publication for all members of the NNSA/NSO family SiteLines looks back at 2007 2007 was a busy and productive year

  17. Site Office Contracting Officer E-mail address Ames Site Office Jackie York Jacquelyn.york@ch.doe.gov

    National Nuclear Security Administration (NNSA)

    Site Office Contracting Officer E-mail address Ames Site Office Jackie York Jacquelyn.york@ch.doe.gov Argonne Site Office Jacquelyn York Jacquelyn.york@ch.doe.gov Brookhaven Site Office Evelyn Landini Jennifer Hartmann elandini@bnl.gov jhartmann@bnl.gov Idaho Site Office Paul Allen allenph@id.doe.gov Kansas City Site Office Ralph Tennant rtennant@kcp.gov Lawrence Livermore Site Office Homer Williamson homer.williamson@nnsa.doe.gov Los Alamos Site Office Barbara Romero Robert M. Poole

  18. DOE site facility mgt contracts Internet Posting 5-2-11.xlsx | Department

    Energy Savers [EERE]

    of Energy site facility mgt contracts Internet Posting 5-2-11.xlsx DOE site facility mgt contracts Internet Posting 5-2-11.xlsx PDF icon DOE site facility mgt contracts Internet Posting 5-2-11.xlsx More Documents & Publications DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE Facility Management Contracts DOE Site Facility Management Contracts Internet Posting

  19. Overview and History of DOE's Hanford Site - 12502

    SciTech Connect (OSTI)

    Flynn, Karen; McCormick, Matt [US DOE (United States)

    2012-07-01

    Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses

  20. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Face to Face Calendar NTS Public Tours Factsheets Speakers Bureau Acronyms Mailing List Information Request Publishing Information Questions/Contact Credits Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office April/May 2007 - Issue 125 A publication for all members of the NNSA/NSO family Small Thermos experiments yield great data on aging stockpile The

  1. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beyond the Call Face-to-Face Calendar NTS Public Tours Factsheets Speakers Bureau To Your Health Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office October/November 2007 - Issue 128 A publication for all members of the NNSA/NSO family CEF conducts three primary

  2. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Face-to-Face NTS Public Tours Factsheets Speakers Bureau Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office March/April 2008 - Issue 130 A publication for all members of the NNSA/NSO family New addition to NSO Teri Holland has joined NSO as the new Assistant

  3. Refurbishment of uranium hexafluoride cylinder storage yards C-745-K, L, M, N, and P and construction of a new uranium hexafluoride cylinder storage yard (C-745-T) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1996-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) is a uranium enrichment facility owned by the US Department of Energy (DOE). A residual of the uranium enrichment process is depleted uranium hexafluoride (UF6). Depleted UF6, a solid at ambient temperature, is stored in 32,200 steel cylinders that hold a maximum of 14 tons each. Storage conditions are suboptimal and have resulted in accelerated corrosion of cylinders, increasing the potential for a release of hazardous substances. Consequently, the DOE is proposing refurbishment of certain existing yards and construction of a new storage yard. This environmental assessment (EA) evaluates the impacts of the proposed action and no action and considers alternate sites for the proposed new storage yard. The proposed action includes (1) renovating five existing cylinder yards; (2) constructing a new UF6 storage yard; handling and onsite transport of cylinders among existing yards to accommodate construction; and (4) after refurbishment and construction, restacking of cylinders to meet spacing and inspection requirements. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969. Therefore, DOE is issuing a Finding of No Significant Impact. Additionally, it is reported in this EA that the loss of less than one acre of wetlands at the proposed project site would not be a significant adverse impact.

  4. DOE - Office of Legacy Management -- Belfield Mill Site - ND 0-01

    Office of Legacy Management (LM)

    Belfield Mill Site - ND 0-01 FUSRAP Considered Sites Site: Belfield Mill Site (ND.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/BelfieldAshingFacility.aspx Documents Related to Belfield Mill Site

  5. DOE - Office of Legacy Management -- Bowman Mill Site - ND 0-02

    Office of Legacy Management (LM)

    Bowman Mill Site - ND 0-02 FUSRAP Considered Sites Site: Bowman Mill Site (ND.0-02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/BowmanAshingFacility.aspx Documents Related to Bowman Mill Site

  6. Dose Modeling Evaluations and Technical Support Document for the Authorized Limits Request for the C-746-U Landfill at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    Boerner, A. J.; Maldonado, D. G.

    2012-06-01

    This report contains the technical basis in support of the DOE?s derivation of Authorized Limits (ALs) for the DOE Paducah C-746-U Landfill. A complete description of the methodology, including an assessment of the input parameters, model inputs, and results is provided in this report. This report also provides initial recommendations on applying the derived soil guidelines. The ORISE-derived soil guidelines are specifically applicable to the Landfill at the end of its operational life. A suggested 'upper bound' multiple of the derived soil guidelines for individual shipments is provided.

  7. DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf |

    Energy Savers [EERE]

    Department of Energy DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf PDF icon DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf More Documents & Publications DOE site facility mgt contracts Internet Posting 5-2-11.xlsx DOE Facility Management Contracts DOEfacilitymgt_contractsownership_01052011.pdf

  8. INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

    2011-05-31

    The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

  9. A Probabilistic Seismic Hazard Analysis Updates Review for Two DOE Sites

    Broader source: Energy.gov [DOE]

    A Probabilistic Seismic Hazard Analysis Updates Review for Two DOE Sites Lawrence Salomone Pinnacle Specialty Group, Inc. DOE NPH Meeting October 21-22, 2014

  10. DOE Facility Management Contracts Facility Owner Contractor

    Office of Environmental Management (EM)

    3/31/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Portsmouth Remediation EM LATA/Parallax 1/10/2005 2/28/2011 2/28/2011 Site Clean up 2005 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 RJ Bell 859 -219-4055 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009

  11. U.S. Department of Energy Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Portsmouth/Paducah Project Office (PPPO) proposes to continue to manage polychlorinated biphenyl (PCB) containing materials. Actions may include, but are not limited to, their maintenance, removal, and disposal, including all necessary staging, storage and shipment. Items and materials include, but are not limited to, PCB-containing oils flushed from transformers, PCB-flushing solutions, and PCB-containing spill or contacted materials from buildings or other aboveground locations that

  12. U.S. Department of Energy Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy (DOE) needs to deactivate the Paducah Gaseous Diffusion Plant (PGDP) in order to place it in an environmentally safe configuration and conduct surveillance and maintenance (S&M). Anticipated deactivation activities include, but are not limited to, continued day to day operation of infrastructure and other activities associated with maintaining the plant; replacement of the current older steam generation boilers with several smaller, more efficient steam boilers;

  13. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity...

    Office of Legacy Management (LM)

    FUSRAP Considered Sites Site: St. Louis Airport Site Vicinity Properties (017) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition:...

  14. DOE - Office of Legacy Management -- Grand Junction Sites

    Office of Legacy Management (LM)

    Grand Junction Sites Grand Junction Sites gj_map Grand Junction Disposal Site Grand Junction Processing Site Grand Junction Site Contact Us

  15. 2012 Annual Planning Summary for Portsmouth Paducah Project Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Portsmouth Paducah Project Office 2012 Annual Planning Summary for Portsmouth Paducah Project Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Portsmouth Paducah Project Office. PDF icon APS-2012-PPPO.pdf More Documents & Publications 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office 2012 Annual Planning

  16. Enterprise Assessments Targeted Review of the Paducah Depleted Uranium

    Office of Environmental Management (EM)

    Hexafluoride Conversion Facility Fire Protection Program - September 2015 | Department of Energy Review of the Paducah Depleted Uranium Hexafluoride Conversion Facility Fire Protection Program - September 2015 Enterprise Assessments Targeted Review of the Paducah Depleted Uranium Hexafluoride Conversion Facility Fire Protection Program - September 2015 September 2015 Targeted Review of the Fire Protection Program at the Paducah Depleted Uranium Hexafluoride Conversion Facility The U.S.

  17. Independent Activity Report, Portsmouth/Paducah Project Office - April 2013

    Office of Environmental Management (EM)

    | Department of Energy Portsmouth/Paducah Project Office - April 2013 Independent Activity Report, Portsmouth/Paducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System Program [HIAR PORTS-2012-09-24] The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion

  18. Nevada Test Site DOE/EIS-0243-SA-01

    National Nuclear Security Administration (NNSA)

    DOE/EIS-0243-SA-01 SUPPLEMENT ANALYSIS FOR THE FEIS FOR THE NTS AND OFF-SITE NEVADA LOCATIONS S-5 limit that has not changed since the 1996 NTS EIS was issued. The volumes of LLW generated by or shipped to the NTS would be within the volumes projected in the 1996 NTS EIS. LLW contributes the bulk of exposures to waste management workers. The collective dose to such workers would be within the limits established in 1996 NTS EIS. While a number of defense programs with the potential for

  19. Darwin : The Third DOE ARM TWP ARCS Site /

    SciTech Connect (OSTI)

    Clements, William E.; Jones, L. A.; Baldwin, T.; Nitschke, K.

    2002-01-01

    The United States Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) Program began operations in its Tropical Western Pacific (TWP) locale in October 1996 when the first Atmospheric Radiation and Cloud Station (ARCS) began collecting data on Manus Island in Papua New Guinea (PNG). Two years later, in November 1998, a second ARCS began operations on the island of Nauru in the Central Pacific. Now a third ARCS has begun collecting data in Darwin, Australia. The Manus, Nauru, and Darwin sites are operated through collaborative agreements with the PNG National Weather Service, The Nauru Department of Industry and Economic Development (IED), and the Australian Bureau of Meteorology's (BOM) Special Services Unit (SSU) respectively. All ARM TWP activities in the region are coordinated with the South Pacific Regional Environment Programme (SPREP) based in Apia, Samoa. The Darwin ARM site and its role in the ARM TWP Program are discussed.

  20. City of Paducah, Kentucky (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    pagesPaducah-Power-System158534167504742 Outage Hotline: 270.575.4010 Outage Map: paducahpower.comoutagesoutag References: EIA Form EIA-861 Final Data File for 2010...

  1. U.S. Department of Energy Awards Paducah Infrastructure Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    announced its award of a 39.9 million small business contract to Swift & Staley Mechanical Contractors, Inc. for infrastructure services activities at the Paducah Gaseous...

  2. Paducah Package Steam Boilers to Provide Efficiency, Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...Paducah Project Office. "We have a responsibility to be a good steward of the environment and taxpayer dollars, and these boilers will help us uphold that responsibility." ...

  3. Independent Oversight Review, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the PortsmouthPaducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program This report provides the results of an independent...

  4. Portsmouth/Paducah Project Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Citizens Advisory Board Meeting - January January 21, 2016 Portsmouth SSAB Board Meeting - March March 3, 2016 National Science Bowl Regional Competition March 11

  5. Portsmouth/Paducah Project Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portsmouth SSAB Board Meeting - January January 7, 2016 Paducah Citizens Advisory Board Meeting - January January 21, 2016 Portsmouth SSAB Board Meeting - March March 3

  6. Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707) Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707) This rule establishes policies, criteria, and procedures for developing and implementing programs to maintain a workplace free from the use of illegal drugs. It applies to DOE contractors performing work at sites owned or controlled by DOE and to individuals with unescorted access to the control areas of certain DOE reactors.

  7. DOE - Office of Legacy Management -- LM Sites Map

    Office of Legacy Management (LM)

    LM Sites Map LM Sites 2016_USsitemap Puerto Rico Connecticut New Jersey Massachusetts Alaska Texas Florida Arizona Missouri Colorado Utah Idaho Washington South Dakota New Mexico California Oregon Tennessee Illinois Ohio Michigan New York Pennsylvania Wyoming Nebraska West Virginia Kentucky Mississippi Nevada Select a Site Acid/Pueblo Canyon Site Adrian Site Albany Site Aliquippa Site Ambrosia Lake Disposal Site Amchitka Site Ashtabula Site Bayo Canyon Site Berkeley Site Beverly Site Bluewater

  8. Environmental assessment for the construction and operation of waste storage facilities at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    1994-06-01

    DOE is proposing to construct and operate 3 waste storage facilities (one 42,000 ft{sup 2} waste storage facility for RCRA waste, one 42,000 ft{sup 2} waste storage facility for toxic waste (TSCA), and one 200,000 ft{sup 2} mixed (hazardous/radioactive) waste storage facility) at Paducah. This environmental assessment compares impacts of this proposed action with those of continuing present practices aof of using alternative locations. It is found that the construction, operation, and ultimate closure of the proposed waste storage facilities would not significantly affect the quality of the human environment within the meaning of NEPA; therefore an environmental impact statement is not required.

  9. DOE - Office of Legacy Management -- Commercial (Burial) Disposal Site

    Office of Legacy Management (LM)

    Maxey Flats Disposal Site - KY 02 Commercial (Burial) Disposal Site Maxey Flats Disposal Site - KY 02 FUSRAP Considered Sites Site: Commercial (Burial) Disposal Site, Maxey Flats Disposal Site (KY.02) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Maxey Flats, Kentucky, Site Documents Related to Commercial (Burial) Disposal Site,

  10. DOE - Office of Legacy Management -- Lowman Mill Site - ID 01

    Office of Legacy Management (LM)

    Lowman Mill Site - ID 01 FUSRAP Considered Sites Site: Lowman Mill Site (ID.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Lowman, Idaho, Disposal Site Documents Related to Lowman Mill Site

  11. Inorganic soil and groundwater chemistry near Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    SciTech Connect (OSTI)

    Moore, G.K.

    1995-03-01

    Near-surface soils, boreholes, and sediments near the Paducah Gaseous Diffusion Plant (PGDP) were sampled in 1989-91 as were monitoring wells, TVA wells, and privately-owned wells. Most wells were sampled two or three times. The resulting chemical analyses have been published in previous reports and have been previously described (CH2M HILL 1991, 1992; Clausen et al. 1992). The two reports by CH2M HILL are controversial, however, because, the concentrations of some constituents were reported to exceed background levels or drinking water standards and because both on-site (within the perimeter fence at PGDP) and off-site pollution was reported to have occurred. The groundwater samples upon which these interpretations were based may not be representative, however. The CH2M HILL findings are discussed in the report. The purpose of this report is to characterize the inorganic chemistry of groundwater and soils near PGDP, using data from the CH2M HILL reports (1991, 1992), and to determine whether or not any contamination has occurred. The scope is limited to analysis and interpretation of data in the CH2M HILL reports because previous interpretations of these data may not be valid, because samples were collected in a relatively short period of time at several hundred locations, and because the chemical analyses are nearly complete. Recent water samples from the same wells were not considered because the characterization of inorganic chemistry for groundwater and soil requirements only one representative sample and an accurate analysis from each location.

  12. Site Screening and Technical Guidance for Monitored Natural Attenuation at DOE Sites

    SciTech Connect (OSTI)

    Borns, D.J.; Brady, P.V.; Brady, W.D.; Krupka, K.M.; Spalding, B.P.; Waters, R.D.; Zhang, P.

    1999-03-01

    Site Screening and Technical Guidance for Monitored Natural Attenuation at DOE Sites briefly outlines the biological and geochemical origins of natural attenuation, the tendency for natural processes in soils to mitigate contaminant transport and availability, and the means for relying on monitored natural attenuation (MNA) for remediation of contaminated soils and groundwaters. This report contains a step-by-step guide for (1) screening contaminated soils and groundwaters on the basis of their potential for remediation by natural attenuation and (2) implementing MNA consistent with EPA OSWER Directive 9200.4-17. The screening and implementation procedures are set up as a web-based tool (http://www.sandia.gov/eesector/gs/gc/na/mnahome.html) to assist US Department of Energy (DOE) site environmental managers and their staff and contractors to adhere to EPA guidelines for implementing MNA. This document is intended to support the Decision Maker's Framework Guide and Monitoring Guide both to be issued from DOE EM-40. Further technical advances may cause some of the approach outlined in this document to change over time.

  13. DOE - Office of Legacy Management -- Exxon Ray Point Site - 032

    Office of Legacy Management (LM)

    Exxon Ray Point Site - 032 FUSRAP Considered Sites Site: Exxon Ray Point Site (032) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Rmedial Action (UMTRA) title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation

  14. DOE - Office of Legacy Management -- Hecla Durita Site - 012

    Office of Legacy Management (LM)

    Hecla Durita Site - 012 FUSRAP Considered Sites Site: Hecla Durita Site (012 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Hecla site is a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II site located in Durita, Colorado. UMTRCA Title II sites are privately owned and operated sites that were active when the Uranium Mill

  15. DOE - Office of Legacy Management -- Kennecott Sweetwater Site - 041

    Office of Legacy Management (LM)

    Kennecott Sweetwater Site - 041 FUSRAP Considered Sites Site: Kennecott Sweetwater Site (041) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Kennecott Sweetwater site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Sweetwater County, Wyoming. UMTRA Title II sites are privately owned and operated sites that were

  16. DOE - Office of Legacy Management -- Plateau Shootaring Canyon Site - 034

    Office of Legacy Management (LM)

    Plateau Shootaring Canyon Site - 034 FUSRAP Considered Sites Site: Plateau Shootaring Canyon Site (034 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Plateau site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Shootaring, Utah. UMTRA Title II sites are privately owned and operated sites that were active when

  17. DOE - Office of Legacy Management -- Sohio Lbar Site - 022

    Office of Legacy Management (LM)

    Sohio Lbar Site - 022 FUSRAP Considered Sites Site: Sohio Lbar Site (022 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in New Mexico. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control

  18. DOE - Office of Legacy Management -- WNI Sherwood Site - 039

    Office of Legacy Management (LM)

    Sherwood Site - 039 FUSRAP Considered Sites Site: WNI Sherwood Site (039) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the State of Washington. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings

  19. DOE - Office of Legacy Management -- WNI Split Rock Site - 043

    Office of Legacy Management (LM)

    Split Rock Site - 043 FUSRAP Considered Sites Site: WNI Split Rock Site (043) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Western Nuclear, Inc. (WNI) Split Rock site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Jeffrey City, Wyoming. UMTRA Title II sites are privately owned and operated sites that were

  20. DOE - Office of Legacy Management -- ANC Gas Hills Site - 040

    Office of Legacy Management (LM)

    ANC Gas Hills Site - 040 FUSRAP Considered Sites Site: ANC Gas Hills Site (040) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The ANC Gas Hills site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Gas Hills, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill

  1. DOE - Office of Legacy Management -- Chevron Panna Maria Site - 030

    Office of Legacy Management (LM)

    Chevron Panna Maria Site - 030 FUSRAP Considered Sites Site: Chevron Panna Maria Site (030) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings

  2. DOE - Office of Legacy Management -- Conoco Conquista Site - 031

    Office of Legacy Management (LM)

    Conoco Conquista Site - 031 FUSRAP Considered Sites Site: Conoco Conquista Site (031) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation

  3. DOE - Office of Legacy Management -- Cotter Canon City Site - 009

    Office of Legacy Management (LM)

    Cotter Canon City Site - 009 FUSRAP Considered Sites Site: Cotter Canon City Site (009) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Cotter site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Canon City, Colorado. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium

  4. DOE - Office of Legacy Management -- Dawn Ford Site - 038

    Office of Legacy Management (LM)

    Dawn Ford Site - 038 FUSRAP Considered Sites Site: Dawn Ford Site (038) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Dawn site is a Uranium Mill Tailings Remedial Action (UMTRA) title II site located in Ford, Washington. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation

  5. DOE - Office of Legacy Management -- EFB White Mesa Site - 033

    Office of Legacy Management (LM)

    EFB White Mesa Site - 033 FUSRAP Considered Sites Site: EFB White Mesa Site (033 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Utah. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill tailings Radiation

  6. DOE-ORP Contract Management Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Contracts & Procurements DOE-ORP Contract Management Plans Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers Contact ORP DOE-ORP Contract Management Plans Email Email Page | Print Print Page |Text Increase Font Size

  7. DOE - Office of Legacy Management -- Monticello Mill Site - UT 03

    Office of Legacy Management (LM)

    Mill Site - UT 03 FUSRAP Considered Sites Site: Monticello Mill Site (UT.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monticello, Utah, Disposal and Processing Sites Documents Related to Monticello Mill Site Monticello Mill Tailings Site Operable Unit III Interim Remedial Action Progress Report July 1999-July 2000.

  8. DOE - Office of Legacy Management -- Pathfinder Lucky Mc Site - 042

    Office of Legacy Management (LM)

    Pathfinder Lucky Mc Site - 042 FUSRAP Considered Sites Site: Pathfinder Lucky Mc Site (042) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Pathfinder Lucky Mc site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the Gas Hills Uranium Mining District west of Casper, Wyoming. UMTRA Title II sites are privately

  9. DOE - Office of Legacy Management -- Pennsylvania Disposal Site - PA 43

    Office of Legacy Management (LM)

    Disposal Site - PA 43 FUSRAP Considered Sites Site: Pennsylvania Disposal Site (PA.43) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if

  10. DOE - Office of Legacy Management -- Uravan Mill Site - CO 02

    Office of Legacy Management (LM)

    Uravan Mill Site - CO 02 FUSRAP Considered Sites Site: Uravan Mill Site (CO.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Uravan Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation

  11. DOE - Office of Legacy Management -- Edgemont Mill Site - SD 01

    Office of Legacy Management (LM)

    Edgemont Mill Site - SD 01 FUSRAP Considered Sites Site: Edgemont Mill Site (SD.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Edgemont, South Dakota, Disposal Site Documents Related to Edgemont Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal

  12. PADUCAH 2015 YEAR IN REVIEW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office KEY ACCOMPLISHMENTS Transitioned site cleanup to new deactivation contractor Fluor Federal Services. Completed the demolition of the C-410C-420 UF6 Feed Plant, the...

  13. DOE Facility Management Contracts Facility Owner Contractor

    Office of Environmental Management (EM)

    transition) 6/15/1999 6/30/2011 2 three month option periods 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 Bill Creech 859-219-4044 Argonne National Laboratory SC UChicago Argonne, LLC 7/31/2006 9/30/2015 4 yrs Award Term

  14. DOE - Office of Legacy Management -- Nevada Test Site - 023

    Office of Legacy Management (LM)

    Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Nevada Test Site was established by the Atomic Energy Commission in the 1950's to conduct field testing of nuclear explosives in connection with the research and development of nuclear weapons. The environmental

  15. DOE - Office of Legacy Management -- New Canaan Site - CT 08

    Office of Legacy Management (LM)

    Canaan Site - CT 08 FUSRAP Considered Sites Site: NEW CANAAN SITE (CT.08) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New Canaan , Connecticut CT.08-1 Evaluation Year: 1985 CT.08-2 Site Operations: None; Investigation of area prompted by public query; no site found in New Canaan. CT.08-1 Site Disposition: Eliminated - No AEC site located in this city CT.08-2 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None

  16. DOE - Office of Legacy Management -- South Valley Superfund Site - 021

    Office of Legacy Management (LM)

    South Valley Superfund Site - 021 FUSRAP Considered Sites Site: South Valley Superfund Site (021) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Department of Energy is one of seven Potentially Responsible Parties (PRP) for the remediation of this site. The Department of Energy is one of the PRPS because of the Atomic Energy Commission¿s

  17. DOE - Office of Legacy Management -- Naval Oil Shale Reserves Site - 013

    Office of Legacy Management (LM)

    Oil Shale Reserves Site - 013 FUSRAP Considered Sites Site: Naval Oil Shale Reserves Site (013 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is located in Anvil Points, Colorado. From the early 1940's through the early 1980's, the U.S. Department of Energy (DOE) conducted oil shale retort experiments in the Green River geologic

  18. Portsmouth/Paducah Project Office

    Energy Savers [EERE]

    SEP 0 6 201 3 David Snyder, Ph.D. Archaeology Reviews Manager Ohio Historic Preservation Office 1982 Velma Avenue Columbus, Ohio 43211 Dear Dr. Snyder: PPPO-03-1934422-13 TRANSMITTAL OF THE PHASE I CULTUTRAL RESOURCE INVESTIGATION OF SELECTED HISTORICAL SITES AT THE PORTSMOUTH GASEOUS DIFFUSION PLANT, SCIOTO AND SEAL TOWNSHIPS, PIKE COUNTY, OHIO Enclosed for your information is the Phase I Cultural Resource Investigation of Selected Historical Sites at the Portsmouth Gaseous Diffusion Plant

  19. DOE - Office of Legacy Management -- Maryland Disposal Site - MD 05

    Office of Legacy Management (LM)

    Maryland Disposal Site - MD 05 FUSRAP Considered Sites Site: MARYLAND DISPOSAL SITE (MD.05 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Baltimore - Vicinity , Maryland MD.05-1 Evaluation Year: 1989 MD.05-1 Site Operations: Proposed disposal site - never developed. MD.05-1 Site Disposition: Eliminated Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None

  20. DOE - Office of Legacy Management -- Shoal Test Site - NV 03

    Office of Legacy Management (LM)

    Shoal Test Site - NV 03 FUSRAP Considered Sites Site: SHOAL TEST SITE (NV.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Sand Springs Range NV.03-1 Location: Near U.S. Highway 50 , Fallon , Nevada NV.03-2 Evaluation Year: 1987 NV.03-2 Site Operations: Underground nuclear detonation site. NV.03-1 Site Disposition: Eliminated - Potential for contamination remote NV.03-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None

  1. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity

    Office of Legacy Management (LM)

    Properties - 017 St Louis Airport Site Vicinity Properties - 017 FUSRAP Considered Sites Site: St. Louis Airport Site Vicinity Properties (017) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: These properties are located in Hazelwood and Berkeley, Missouri, approximately 15 miles northwest of downtown St. Louis. The properties are

  2. DOE - Office of Legacy Management -- SiteA

    Office of Legacy Management (LM)

    Illinois Site A/Plot M Decommissioned Reactor Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2013 Inspection and Annual Site Status Report for the Site A/Plot M, Cook County, Illinois Decontamination and Decommissioning Program Site Annual Monitoring Report Environmental Monitoring Program at Site A and Plot M, Palos Forest Preserve, Cook County, Illinois Long-Term Surveillance and Maintenance Plan for Site A/Plot M, Illinois,Decommissioned

  3. DOE/WIPP-11-2225 Waste Isolation Pilot Plant Annual Site Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    11-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 U.S. Department of Energy September 2011 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 2 This page intentionally left blank Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 3 2010 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 presents summary environmental

  4. DOE/EIS-0279-SA-01 DOE/EIS-0218-SA-06 Supplement Analysis Savannah River Site

    Office of Environmental Management (EM)

    79-SA-01 DOE/EIS-0218-SA-06 Supplement Analysis Savannah River Site Spent Nuclear Fuel Management U.S. Department of Energy Office of Environmental Management Savannah River Operations Office Aiken, South Carolina March 2013 DOE/EIS-0279-SA-O 1 and DOE/EIS-0218-SA-06 SUPPLEMENT ANALYSIS SAVANNAH RIVER SITE SPENT NUCLEAR FUEL MANAGEMENT March 2013 1. INTI~,ODUCTION The Dep*rtment of EneqfY (DOE) has a continuing responsibility for safeguarding and managing highly enriched uranium (HEU), including

  5. Portsmouth/Paducah Project Office

    Energy Savers [EERE]

    'JUN 2 0 2013 David Snyder, Ph.D. Archaeology Reviews Manager Ohio Historic Preservation Office 1982 Velma Avenue Columbus, Ohio 43211 Dear Dr. Snyder: PPPO-03-1927531-13 TRANSMITTAL OF THE PHASE I ARCHAEOLOGICAL SURVEY OF SITES 33PK322, 33PK323, AND 33PK324 AT THE PORTSMOUTH GASEOUS DU'FUSION PLANT, PIKE COUNTY, OHIO AND SUPPORTING DOCUMENTS Enclosed for your information is the Phase I Archaeological Survey o/Sites 33PK322, 33PK323, and 33PK324 at the Portsmouth Gaseous Diffusion Plant (PORTS),

  6. DOE - Office of Legacy Management -- Trinity Test Site - NM 17

    Office of Legacy Management (LM)

    Trinity Test Site - NM 17 FUSRAP Considered Sites Site: TRINITY TEST SITE (NM.17 ) Eliminated from consideration under FUSRAP - U.S. Army controls site Designated Name: Not Designated Alternate Name: None Location: missile range - 30 miles west of Carrizozo , White Sands , New Mexico NM.17-1 Evaluation Year: 1985 NM.17-1 Site Operations: Detonation of the first atomic bomb occurred at this site. NM.17-1 Site Disposition: Eliminated NM.17-1 Radioactive Materials Handled: Yes Primary Radioactive

  7. Moratorium and Suspension of the Release of Metals from DOE Sites |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Moratorium and Suspension of the Release of Metals from DOE Sites Moratorium and Suspension of the Release of Metals from DOE Sites Key Documents related to the Secretarial moratorium on the release of volumetrically contaminated metals form DOE facilities and the agency-wide suspension on the unrestricted release of scrap metal originating form radiological areas at DOE facilities for the purpose of recycling. Memorandum on Release of Materials for Re-Use and Recycle,

  8. Waste to Energy Power Production at DOE and DOD Sites | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Waste to Energy Power Production at DOE and DOD Sites Waste to Energy Power Production at DOE and DOD Sites Presentation by Joe Price, Ameresco, DOE-DOD Waste to Energy using Fuel Cells Workshop held Jan. 13, 2011 PDF icon waste_price.pdf More Documents & Publications Ameresco ESCO Qualification Sheet Air Force Renewable Energy Programs DOE IDIQ Energy Savings Performance Contract Awarded Projects

  9. Moratorium and Suspension of the Release of Metals from DOE Sites |

    Office of Environmental Management (EM)

    Department of Energy Moratorium and Suspension of the Release of Metals from DOE Sites Moratorium and Suspension of the Release of Metals from DOE Sites Key Documents related to the Secretarial moratorium on the release of volumetrically contaminated metals form DOE facilities and the agency-wide suspension on the unrestricted release of scrap metal originating form radiological areas at DOE facilites for the purpose of recycling. PDF icon Memorandum on Release of Materials for Re-Use and

  10. Chief Medical Officer Web Site Services Available To All DOE Employees |

    Office of Environmental Management (EM)

    Department of Energy Chief Medical Officer Web Site Services Available To All DOE Employees Chief Medical Officer Web Site Services Available To All DOE Employees August 15, 2013 - 3:34pm Addthis Chief Medical Officer Web Site Services Available To All DOE Employees Did you ever wonder why you must undergo certain medical examinations every year if you work with hazardous materials or serve in a security function? Have you ever experienced stress, been worried about a family member's health,

  11. DOE Announces Transfer of Depleted Uranium to Advance the U.S. National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Interests, Extend Operations at Paducah Gaseous Diffusion Plant | Department of Energy Transfer of Depleted Uranium to Advance the U.S. National Security Interests, Extend Operations at Paducah Gaseous Diffusion Plant DOE Announces Transfer of Depleted Uranium to Advance the U.S. National Security Interests, Extend Operations at Paducah Gaseous Diffusion Plant May 15, 2012 - 4:00pm Addthis News Media Contact (202) 386-4940 WASHINGTON - The Department of Energy - in collaboration

  12. Portsmouth/Paducah Project Office

    Energy Savers [EERE]

    9 2014 PPPO-03-2169885-14 TRANSMITTAL OF A REPORT OF EXAMPLE PUBLICLY-AVAILABLE ARCHIVAL RESOURCES THAT MAY BE USED TO INTERPRET HISTORIC-ERA SITES As you are aware, since 1996 the Department of Energy at the Portsmouth Gaseous Diffusion Plant (PORTS) has been engaged in conducting archaeological surveys to inventory cultural resources and identify historic properties. All of the surveys were completed in 2012 and we are continuing to document the results and provide them to you and our

  13. DOE - Office of Legacy Management -- Marion Mill Site - CO 09

    Office of Legacy Management (LM)

    Mill Site - CO 09 FUSRAP Considered Sites Site: MARION MILL SITE (CO.09 ) Eliminated from further consideration under FUSRAP - deferred to the State of Colorado for appropriate action. Designated Name: Not Designated Alternate Name: None Location: Sugar Leaf Road , Boulder , Colorado CO.09-1 Evaluation Year: Circa 1983 CO.09-1 Site Operations: Milled and processed thorite and other rare earth ores in 1957 and 1958. Some of the thorium concentrate produced was shipped to Davison Chemical Company

  14. EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental

    Office of Environmental Management (EM)

    Impact Statement and Notice of Public Hearings | Department of Energy DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada The National Nuclear Security Administration (NNSA), a separately organized semi-autonomous

  15. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    222-S Lab Services http:www.emcbc.doe.g ovSEBhanfordlab EMCBC Small Business Fixed Price 40M-60M NA 2282014 12162013 642014 872014 5282015 Paducah Infrastructure...

  16. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    Paducah GDP http:www.emcbc.doe.g ovSEBPGDP%20Deac tivation EMCBC Multiple award IDIQ contract holders Cost Plus Award Fee with Fixed Price CLINS 600M- 680M 512013 529...

  17. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    Hanford 222-S Lab Services http:www.emcbc.doe.g ovSEBhanfordlab EMCBC Small Business Fixed Price 40M-60M NA 2282014 12162013 642014 872014 5282015 Paducah...

  18. Site Specific Coal Conversion | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Specific Coal Conversion The Site Specific Coal Conversion Key Technology will include less mature R&D and case-specific engineering and construction and balance of plant R&D ...

  19. DOE Issues Draft RFP for Hanford Site Lab Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab.

  20. DOE - Office of Legacy Management -- Latty Avenue Site - MO 04

    Office of Legacy Management (LM)

    Latty Avenue Site - MO 04 FUSRAP Considered Sites Latty Avenue Site, MO Alternate Name(s): Futura Coatings Futura Chemical Company Facility Hazelwood Interim Storage Site (HISS) Former Cotter Site, Latty Avenue Properties Contemporary Metals Corp. Continental Mining and Milling MO.04-1 MO.04-2 MO.04-5 MO.04-6 MO.06-8 MO.06-11 Location: 9200 Latty Avenue, Hazelwood, Missouri MO.04-1 Historical Operations: Received, stored, and processed uranium residues for the AEC. Storage and processing were

  1. DOE - Office of Legacy Management -- Wayne Site - NJ 16

    Office of Legacy Management (LM)

    Wayne Site - NJ 16 FUSRAP Considered Sites Wayne, NJ Alternate Name(s): Wayne Interim Storage Site (WISS) W.R. Grace and Company W.R. Grace Site Rare Earths, Inc. Davison Chemical Division NJ.16-1 NJ.16-2 NJ.16-3 Location: 868 Black Oak Ridge Road, Wayne, New Jersey NJ.16-5 Historical Operations: Produced crude thorium hydroxide and rare earth elements from monazite sands. Site was also used for interim storage of contaminated material removed from vicinity properties under FUSRAP. NJ.16-5

  2. Environmental Report Project Informs Paducah Community, Educates Students |

    Energy Savers [EERE]

    Department of Energy Report Project Informs Paducah Community, Educates Students Environmental Report Project Informs Paducah Community, Educates Students January 28, 2015 - 12:00pm Addthis Students examine different species found in the West Kentucky Wildlife Management Area. Students examine different species found in the West Kentucky Wildlife Management Area. Students watch as water samples are taken to be used to measure water quality. Students watch as water samples are taken to be

  3. Sampling and Analysis at the Vortec Vitrification Facility in Paducah,

    Office of Scientific and Technical Information (OSTI)

    Kentucky. Semiannual report, November 1, 1996--March 31, 1997 (Technical Report) | SciTech Connect Technical Report: Sampling and Analysis at the Vortec Vitrification Facility in Paducah, Kentucky. Semiannual report, November 1, 1996--March 31, 1997 Citation Details In-Document Search Title: Sampling and Analysis at the Vortec Vitrification Facility in Paducah, Kentucky. Semiannual report, November 1, 1996--March 31, 1997 The Vortec Cyclone Melting System (CMS) facility; to be located at the

  4. DOE-Funded Project Testing Laser CO2 Monitoring at Carbon Storage Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE-Funded Project Testing Laser CO2 Monitoring at Carbon Storage Site DOE-Funded Project Testing Laser CO2 Monitoring at Carbon Storage Site June 3, 2015 - 8:44am Addthis Photo courtesy of Exelis Photo courtesy of Exelis A project that uses lasers to monitor carbon dioxide (CO2) is being analyzed as part of the U.S. Department of Energy's (DOE) drive to improve greenhouse gas-monitoring abilities at CO2 storage sites. The project is managed by the DOE Office of Fossil

  5. Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707)

    Broader source: Energy.gov [DOE]

    This rule establishes policies, criteria, and procedures for developing and implementing programs to maintain a workplace free from the use of illegal drugs. It applies to DOE contractors performing work at sites owned or controlled by DOE and to individuals with unescorted access to the control areas of certain DOE reactors.

  6. DOI Designates B Reactor at DOE's Hanford Site as a National Historic

    Energy Savers [EERE]

    Landmark | Department of Energy DOI Designates B Reactor at DOE's Hanford Site as a National Historic Landmark DOI Designates B Reactor at DOE's Hanford Site as a National Historic Landmark August 25, 2008 - 3:20pm Addthis DOE to offer regular public tours in 2009 WASHINGTON, DC - U.S. Department of the Interior (DOI) Deputy Secretary Lynn Scarlett and U.S. Department of Energy (DOE) Acting Deputy Secretary Jeffrey F. Kupfer today announced the designation of DOE's B Reactor as a National

  7. Evaluation of the proposed pilot groundwater pump and treat demonstration for the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Hale, T.B.; Huff, D.D.; Nickelson, M.D.; Rightmire, C.T.

    1992-11-01

    This report contains the evaluation and recommendations of a Groundwater Corrective Actions Review Team. The primary goal is to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at Paducah, Kentucky. A key distinction recognized by the review team is that the proposed project is intended to be a full-scale hydraulic containment of contaminants migrating from the sources of the plume, not plume remediation. The key questions incorporated into this plan are whether (1) dense, nonaqueous-phase liquids (DNAPLS) are present in the Regional Gravel Aquifer (RGA) at the source of the plume and (2) [sup 99]Tc removal must be included as part of any groundwater treatment process. The first question cannot be answered until the contaminant sources are better defined; the second question requires further risk assessment and/or a policy decision by DOE. Technical evaluation by the review team suggests that the recommended course of action be to modify the proposed work plan to include accurate identification of the sources of contaminants and vertical distribution of contaminants within the Northwest plume before a decision is made on the preferred source-control option. If DNAPLs are not present in the RGA, removal or containment of the sources is recommended. If DNAPLs are present, then hydraulic containment will be required. Finally, the review team recognizes that it is necessary to initiate a more comprehensive analysis of sitewide remediation needs to create links between action taken for the Northwest plume and action taken for other contamination sites at PGPD.

  8. DOE - Office of Legacy Management -- Beverly MA Site - MA 04

    Office of Legacy Management (LM)

    Beverly MA Site - MA 04 FUSRAP Considered Sites Beverly, MA Alternate Name(s): Metal Hydrides, Inc. Ventron Corporation MA.04-1 Location: Congress Street, Beverly, Massachusetts MA.04-4 Historical Operations: Provided uranium metal production under contract with MED. Thorium and radium contamination occurred from non-MED operations. MA.04-6 Eligibility Determination: Eligible MA.04-1 Radiological Survey(s): Assessment Survey, Verification Survey MA.04-4 MA.04-7 Site Status: Certified-

  9. Maintenance at DOE Legacy Management Sites Weldon Spring...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... be the most effective means of preserving ICs knowledge. ... in maintaining ICs by informing LM of site conditions and ... risk to construction workers accessing the buried ...

  10. DOE - Office of Legacy Management -- Riverton Mill Site - WY...

    Office of Legacy Management (LM)

    Control Act (UMTRCA) Title I Site April Gil, PhD Environment Team Lead Office of Legacy Management (LM) May 2, 20122 Status and Action Summary Surface Remediation ...

  11. DOE - Office of Legacy Management -- Shiprock Mill Site - NM...

    Office of Legacy Management (LM)

    ... Evaluation of the Trench 2 Groundwater Remediation System at the Shiprock, New Mexico, Legacy Management Site March 2009 Supplement to the Baseline Risk Assessment of Ground Water ...

  12. DOE Awards Contract for Hanford Site 222-S Laboratory Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) announced today that Wastren Advantage, Incorporated located in Piketon, Ohio has been awarded a $44.6 million contract for the operation and performance of analytical and testing services at the DOE Hanford 222-S Laboratory. Four proposals were received in response to the solicitation. The contract includes a two year base period of performance with three one-year option periods.

  13. DOE/WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 Errata U.S. Department of Energy September 2010 2 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 DOE/WIPP-10-2225 3 2009 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2009 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and

  14. Two Years Later: Bill Picciano of DOE's Savannah River Site

    Broader source: Energy.gov [DOE]

    We checked back in with Bill Picciano, who we last spoke to in October 2009 after he'd recently been hired at the Savannah River Site (SRS) through the Recovery Act. Now he's permanently employed at the Site as an Associate Engineer/Technical Support Specialist - a job he's proud to have.

  15. Rocketdyne Propulsion & Power DOE Operations Annual Site Environmental Report 1996

    SciTech Connect (OSTI)

    Tuttle, R. J.

    1997-11-10

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by Rocketdyne Propulsion & Power of Boeing North American. Inc. (formerly Rockwell International Corporation). These are identified as the Santa Susana Field Laboratory (SSFL and the De Soto site. The sites have been used for manufacturing; R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warrants comprehensive monitoring to ensure protection of the environment.

  16. Framework for DOE mixed low-level waste disposal: Site fact sheets

    SciTech Connect (OSTI)

    Gruebel, M.M.; Waters, R.D.; Hospelhorn, M.B.; Chu, M.S.Y.

    1994-11-01

    The Department of Energy (DOE) is required to prepare and submit Site Treatment Plans (STPS) pursuant to the Federal Facility Compliance Act (FFCAct). Although the FFCAct does not require that disposal be addressed in the STPS, the DOE and the States recognize that treatment of mixed low-level waste will result in residues that will require disposal in either low-level waste or mixed low-level waste disposal facilities. As a result, the DOE is working with the States to define and develop a process for evaluating disposal-site suitability in concert with the FFCAct and development of the STPS. Forty-nine potential disposal sites were screened; preliminary screening criteria reduced the number of sites for consideration to twenty-six. The DOE then prepared fact sheets for the remaining sites. These fact sheets provided additional site-specific information for understanding the strengths and weaknesses of the twenty-six sites as potential disposal sites. The information also provided the basis for discussion among affected States and the DOE in recommending sites for more detailed evaluation.

  17. DOE - Office of Legacy Management -- Maywood Site - NJ 10

    Office of Legacy Management (LM)

    Maywood Site - NJ 10 FUSRAP Considered Sites Maywood, NJ Alternate Name(s): Maywood Chemical Works Maywood Chemical Company Maywood Interim Storage Site (MISS) Stepan Chemical Company NJ.10-2 NJ.10-3 NJ.10-7 NJ.10-11 Location: 100 West Hunter Avenue, Maywood/Rochelle Park, New Jersey NJ.10-4 Historical Operations: Processed monazite sands for extraction of rare earth compounds and mantle-grade thorium nitrates. NJ.10-2 NJ.10-3 NJ.10-4 NJ.10-5 Eligibility Determination: Eligible NJ.10-1 NJ.10-10

  18. DOE - Office of Legacy Management -- Hamilton OH Site - OH 27

    Office of Legacy Management (LM)

    Hamilton OH Site - OH 27 FUSRAP Considered Sites Hamilton, OH Alternate Name(s): Herring-Hall-Marvin Safe Company Diebold Incorporated OH.27-2 Location: 1550 Grand Boulevard, Hamilton, Ohio OH.27-2 Historical Operations: Machined uranium metal slugs from rolled stock, under subcontract with National Lead, an MED contractor. OH.27-3 OH.27-4 OH.27-9 Eligibility Determination: Eligible OH.27-1 Radiological Survey(s): Assessment Surveys, Verification Survey OH.27-1 OH.27-5 OH.27-6 OH.27-7 Site

  19. 2014 Annual Planning Summary for the Portsmouth/Paducah Project Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Portsmouth/Paducah Project Office 2014 Annual Planning Summary for the Portsmouth/Paducah Project Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Portsmouth/Paducah Project Office. PDF icon PPPO-NEPA-APS-2014.pdf More Documents & Publications 2013 Annual Planning Summary for the Portsmouth and Paducah Project Office 2014 Annual Planning Summary for the Bonneville Power Administration

  20. DOE - NNSA/NSO -- SiteLines - Issue 143

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May/June 2010 - Issue 143 A publication for all members of the NNSA/NSO family BEEF's Changing Role to Meet Current, Future Customer Needs As the Nevada Test Site's (NTS) mission evolves, the Big Explosives Experimental Facility (BEEF) has been revitalized with a series of new experiments designed to demonstrate the site's ability to support more diverse missions. Two From WSI-Nevada Team Receive Major Recognition The remarkable service and professional achievement of two WSI-Nevada Team

  1. DOE - Office of Legacy Management -- Berkeley CA Site - CA 03

    Office of Legacy Management (LM)

    Berkeley CA Site - CA 03 FUSRAP Considered Sites Berkeley, CA Alternate Name(s): University of California Gilman Hall, University of California CA.03-1 Location: Gilman Hall, University of California, Berkeley, California CA.03-1 Historical Operations: Performed research and development on the synthesis and production of plutonium, resulting in uranium, plutonium, cesium and americium contamination. CA.03-3 CA.03-5 Eligibility Determination: Eligible CA.03-1 CA.03-2 Radiological Survey(s):

  2. Y-12 now a DOE-VPP Star site | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    now a DOE-VPP Star ... Y-12 now a DOE-VPP Star site Posted: June 6, 2012 - 2:00pm B&W Y-12 Senior Vice President and Deputy General Manager of Operations Bill Klemm (center) and Atomic Trades and Labor Council President Steve Jones (right) raise the DOE-VPP Star flag as Dan Hoag, NNSA acting site manager, looks on. The Y-12 National Security Complex now flies the VPP Star flag after a ceremony held Tuesday morning, June 5. The flag signifies Y-12's recent achievement of DOE-VPP Star status,

  3. Post-Closure Benefits: DOE Complex vs Closure Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Closure Benefits » Post-Closure Benefits: DOE Complex vs Closure Sites Post-Closure Benefits: DOE Complex vs Closure Sites Status of Contractor Pension and PRB Benefit Programs - September 30, 2013 DOE Wide Closure Sites Defined Benefit Pension Plans 36 6 Defined Contribution Plans 13 0 PRB Plans >100 7 Active Participants 61,400 0 Retirees/Survivors 75,300 6,400 Terminated Vested Participants 39,500 2,900 FY 2013 Pension Unfunded Liability 10,616 Million 0 Million FY 2013 PRB Unfunded

  4. A Probabilistic Seismic Hazard Analysis Update Review for Two DOE Sites and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NGA-East Project Overview and Status | Department of Energy A Probabilistic Seismic Hazard Analysis Update Review for Two DOE Sites and NGA-East Project Overview and Status A Probabilistic Seismic Hazard Analysis Update Review for Two DOE Sites and NGA-East Project Overview and Status Presentation from the May 2015 Seismic Lessons-Learned Panel Meeting. PDF icon A Probabilistic Seismic Hazard Analysis Update Review for Two DOE Sites and NGA-East Project Overview and Status More Documents

  5. DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH.

  6. Site Specific Coal Conversion | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Specific Coal Conversion The Site Specific Coal Conversion Key Technology will include less mature R&D and case-specific engineering and construction and balance of plant R&D to most effectively deploy advanced C&CBTL systems in a certain location, with a certain feed, infrastructure, and environment for fuels production. Essentially, work in this area will be a bridge between a systems or process design for a particular application of coal-biomass to liquids, and a specific

  7. DOE - Office of Legacy Management -- Seymour CT Site - CT 02

    Office of Legacy Management (LM)

    Seymour CT Site - CT 02 FUSRAP Considered Sites Seymour, CT Alternate Name(s): Bridgeport Brass Company Seymour Specialty Wire Reactive Metals, Inc. National Distillers and Chemical Co. Havens Plant CT.02-2 CT.02-3 CT.02-6 Location: 15 Franklin Street, Seymour, Connecticut CT.02-4 Historical Operations: Procured, processed and stored uranium oxides, salts, and metals for AEC and processed the products by cold-forming or extruding natural uranium metal. CT.02-3 CT.02-9 Eligibility Determination:

  8. DOE - Office of Legacy Management -- Buffalo NY Site - NY 54

    Office of Legacy Management (LM)

    Buffalo NY Site - NY 54 FUSRAP Considered Sites Buffalo, NY Alternate Name(s): Bliss & Laughlin Steel Company Niagara Cold Drawn Steel Corporation Ramco Steel Incorporated NY.54-1 NY.54-4 Location: 110 Hopkins Street, Buffalo, New York NY.54-1 Historical Operations: Machined and straightened uranium rods as subcontracted work from National Lead Company, an AEC contractor. NY.54-3 NY.54-4 LTSM012601 Eligibility Determination: Eligible NY.54-4 Radiological Survey(s): Assessment Surveys,

  9. DOE - Office of Legacy Management -- Fairfield OH Site - OH 23

    Office of Legacy Management (LM)

    Fairfield OH Site - OH 23 FUSRAP Considered Sites Fairfield, OH Alternate Name(s): Associate Aircraft Tool & Manufacturing, Inc. Associated Aircraft Tool and Manufacturing Company Force Control Industries Former Dixie Machinery OH.23-1 OH.23-2 Location: 3660 Dixie Highway, Fairfield, Ohio OH.23-2 Historical Operations: Produced natural uranium hollow slugs, resulting in uranium metal contamination. OH.23-4 OH.23-5 Eligibility Determination: Eligible OH.23-1 OH.23-2 Radiological Survey(s):

  10. DOE - Office of Legacy Management -- Oxford OH Site - OH 22

    Office of Legacy Management (LM)

    Oxford OH Site - OH 22 FUSRAP Considered Sites Oxford, OH Alternate Name(s): Alba Craft Shop Alba Craft Laboratory Albaugh dba Alba Craft Shop OH.22-3 OH.22-4 Location: 10-14 West Rose Avenue, Oxford, Ohio OH.22-7 Historical Operations: Performed metal fabrication under subcontract with AEC prime contract to National Lead Company of Ohio on uranium metal. Includes VPs. OH.22-5 OH.22-6 OH.22-8 Eligibility Determination: Eligible OH.22-1 OH.22-2 Radiological Survey(s): Assessment Survey,

  11. DOE/EV-0005/16 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    6 Formerly Utilized MED/AEC Sites Remedial Action Program Radic&@cal Survey of the St. Louis Airport Storage Site, St. Louis, Missouri September 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology .__ -. __ ..- -- DOE/EV-0005/16 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the St. Louis Airport Storage Site, St. Louis, Missouri September 1979 Final Report Prepared for

  12. DOE/EV-0005/19 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    9 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980 . Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology ~--.. _..-- DOE/EV-0005/19 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiologidal Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980

  13. DOE recognizes Nevada National Security Site contractor for safety |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration recognizes Nevada National Security Site contractor for safety | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets

  14. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy PLEASE KEEP THIS PAHPHLET WITH YOU DURING YOUR VISIT Welcome to the Hanford Site Visitor Orientation 2 We take safety, security, and environmental protection seriously The safety and health of our employ- ees, the public, and those who visit the Hanford Site, in addition to site security and protection of the envi- ronment, are fundamental values of the U.S. Department of Energy (DOE) and its contractors. We strive to achieve and sustain a worksite that is free of

  15. DOE Moab Site Cost-Effectively Eliminates 200 Million Gallons of Contaminated Ground Water

    Broader source: Energy.gov [DOE]

    Grand Junction, CO ― The Department of Energy (DOE) announced today that it has extracted 200 million gallons of contaminated ground water from the Moab site in Utah as part of the Moab Uranium Mill Tailings Remedial Action Project.

  16. DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 9 DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual Chapter 20.0 - H & R COMMITTEE CHARTER November 15, 2012 Rev 1 Page 2 This page...

  17. DOE and Colorado Mesa University Education Agreement Expands LM's Site Reuse Portfolio

    Broader source: Energy.gov [DOE]

    A partnership with Colorado Mesa University (CMU) in Grand Junction, Colorado, and the U.S. Department of Energy (DOE) recently provided a chance for CMU students and their instructor to visit the Grand Junction, Colorado, Disposal Site.

  18. Potential application of the Motorola MSR-20 Radar to DOE site security

    SciTech Connect (OSTI)

    Arlowe, D.; Rebeil, P.; Vigil, R.

    1993-09-01

    This paper describes the results of testing the MSR-20 radar and provides guidance on how this radar may be used to provide early detection and warning of approaching intruders beyond DOE facility site boundaries.

  19. DOE's Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the transfer of nearly 4,000 acres of its former Rocky Flats nuclear weapons production site to the Department of the Interior's...

  20. DOE - NNSA/NFO -- SiteLines Newsletter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications > OneVoice NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office OneVoice Newsletter OneVoice is used to communicate current activities and events to NNSA/NFO, contractor and laboratory employees, their families, stakeholders, retired employees, corporate management, and local, state and federal officials. The newsletter reaches more than 4,000 readers in 20 states. Instructions: Click the document title to view or download the Adobe PDF file marked with this icon ( ) [

  1. DOE - Office of Legacy Management -- Niagara Falls Storage Site NY - NY 17

    Office of Legacy Management (LM)

    Considered Sites > Niagara Falls Storage Site NY - NY 17 FUSRAP Considered Sites Niagara Falls Storage Site, NY Alternate Name(s): Lake Ontario Ordnance Works (LOOW) Niagara Falls Storage Site (NFSS) DOE-Niagara Falls Storage Site NY.17-1 NY.17-3 Location: Lewiston, New York NY.17-5 Historical Operations: Stored, shipped, and buried radioactive equipment and waste for MED and AEC containing uranium, radium, and thorium. Contains Interim Waste Containment Structure. NY.17-1 NY.17-2 NY.17-14

  2. Nevada Test Site DOE/EIS-0243-SA-01

    National Nuclear Security Administration (NNSA)

    Impacts to members of the public from routine airborne emissions of radionuclides were analyzed by evaluating current and planned airborne emissions of radionuclides and the resulting dose to the offsite maximally exposed individual. Impacts to the maximally exposed off-site individual from all sources of airborne emissions of radionuclides in 2000 were less than 2 percent of the 10 millirem annual limit. New emissions from new missions and projects would have a negligible impact on the total

  3. DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EA for Conveyance of Land at the Hanford Site, Richland, WA Page 1 of 6 September 2015 DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE, RICHLAND, WASHINGTON AGENCY: U.S. Department of Energy Richland Operations Office ACTION: Mitigation Action Plan SUMMARY: This Mitigation Action Plan (MAP) is an integral part of the Finding of No Significant Impact (FONSI) for the United States Department of Energy's (DOE) Environmental Assessment for Proposed Conveyance of

  4. DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE,

    Office of Environmental Management (EM)

    EA for Conveyance of Land at the Hanford Site, Richland, WA Page 1 of 6 September 2015 DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE, RICHLAND, WASHINGTON AGENCY: U.S. Department of Energy Richland Operations Office ACTION: Mitigation Action Plan SUMMARY: This Mitigation Action Plan (MAP) is an integral part of the Finding of No Significant Impact (FONSI) for the United States Department of Energy's (DOE) Environmental Assessment for Proposed Conveyance of

  5. Qualification of Three On-line Slurry Monitoring Devices for Application during Waste Retrieval Operations at DOE Sites

    SciTech Connect (OSTI)

    Bontha, Jagannadha R.; Bamberger, Judith A.; Hylton, Tom D.; May, T. H.

    2000-10-18

    Qualification of Three On-line Slurry Monitoring Devices for Application during Waste Retrieval Operations at DOE Sites

  6. EMP Attachment 3 DOE-SC PNNL Site Dose Assessment Guidance

    SciTech Connect (OSTI)

    Snyder, Sandra F.

    2011-12-21

    This Dose Assessment Guidance (DAG) describes methods to use to determine the Maximally-Exposed Individual (MEI) location and to estimate dose impact to that individual under the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan (EMP). This guidance applies to public dose from radioactive material releases to the air from PNNL Site operations. This document is an attachment to the Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP) and describes dose assessment guidance for radiological air emissions. The impact of radiological air emissions from the U.S. Department of Energy Office of Science (DOE-SC) PNNL Site is indicated by dose estimates to a maximally exposed member of the public, referred to as the maximally exposed individual (MEI). Reporting requirements associated with dose to members of the public from radiological air emissions are in 40 CFR Part 61.94, WAC 246-247-080, and DOE Order 458.1. The DOE Order and state standards for dose from radioactive air emissions are consistent with U.S. Environmental Protection Agency (EPA) dose standards in 40 CFR 61.92 (i.e., 10 mrem/yr to a MEI). Despite the fact that the current Contract Requirements Document (CRD) for the DOE-SC PNNL Site operations does not include the requirement to meet DOE CRD 458.1, paragraph 2.b, public dose limits, the DOE dose limits would be met when EPA limits are met.

  7. DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy, National Nuclear Security Administration (NNSA) has issued the Final Site-Wide Environmental Impact Statement (EIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. This document presents an analysis of the potential environmental impacts of continued management and operation of the NNSS (formerly known as the Nevada Test Site), the Tonopah Test Range, and two locations in Las Vegas, Nevada. The Site-Wide EIS analyzes reasonably foreseeable missions, programs, capabilities, and projects for a 10-year period.

  8. 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site June 18, 2013 - 12:00pm Addthis Media Contacts Donald Metzler, Moab Federal Project Director (970) 257-2115 Wendee Ryan, S&K Aerospace Public Affairs Manager (970) 257-2145 (Grand Junction, CO) - Today, the Department of Energy (DOE) announced that 6 million tons of uranium mill tailings have been shipped from Moab, Utah, under the

  9. TECHNICAL EVALUATION OF TEMPORAL GROUNDWATER MONITORING VARIABILITY IN MW66 AND NEARBY WELLS, PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.

    2012-08-28

    Evaluation of disposal records, soil data, and spatial/temporal groundwater data from the Paducah Gaseous Diffusion Plant (PGDP) Solid Waste Management Unit (SWMU) 7 indicate that the peak contaminant concentrations measured in monitoring well (MW) 66 result from the influence of the regional PGDP NW Plume, and does not support the presence of significant vertical transport from local contaminant sources in SWMU 7. This updated evaluation supports the 2006 conceptualization which suggested the high and low concentrations in MW66 represent different flow conditions (i.e., local versus regional influences). Incorporation of the additional lines of evidence from data collected since 2006 provide the basis to link high contaminant concentrations in MW66 (peaks) to the regional 'Northwest Plume' and to the upgradient source, specifically, the C400 Building Area. The conceptual model was further refined to demonstrate that groundwater and the various contaminant plumes respond to complex site conditions in predictable ways. This type of conceptualization bounds the expected system behavior and supports development of environmental cleanup strategies, providing a basis to support decisions even if it is not feasible to completely characterize all of the 'complexities' present in the system. We recommend that the site carefully consider the potential impacts to groundwater and contaminant plume migration as they plan and implement onsite production operations, remediation efforts, and reconfiguration activities. For example, this conceptual model suggests that rerouting drainage water, constructing ponds or basin, reconfiguring cooling water systems, capping sites, decommissioning buildings, fixing (or not fixing) water leaks, and other similar actions will potentially have a 'direct' impact on the groundwater contaminant plumes. Our conclusion that the peak concentrations in MW66 are linked to the regional PGDP NW Plume does not imply that there TCE is not present in SWMU 7. The available soil and groundwater data indicate that the some of the waste disposed in this facility contacted and/or were contaminated by TCE. In our assessment, the relatively small amount of TCE associated with SWMU 7 is not contributing detectable TCE to the groundwater and does not represent a significant threat to the environment, particularly in an area where remediation and/or management of TCE in the NW plume will be required for an extended timeframe. If determined to be necessary by the PGDP team and regulators, additional TCE characterization or cleanup activities could be performed. Consistent with the limited quantity of TCE in SWMU 7, we identify a range of low cost approaches for such activities (e.g., soil gas surveys for characterization or SVE for remediation). We hope that this information is useful to the Paducah team and to their regulators and stakeholders to develop a robust environmental management path to address the groundwater and soil contamination associated with the burial ground areas.

  10. Paducah Plant Begins Enrichment Operations after Five Parties Strike

    Energy Savers [EERE]

    Agreement | Department of Energy Plant Begins Enrichment Operations after Five Parties Strike Agreement Paducah Plant Begins Enrichment Operations after Five Parties Strike Agreement May 1, 2012 - 12:00pm Addthis This cylinder hauler at Paducah’s Babcock & Wilcox Conversion Services plant delivers the first of DOE’s 14-ton depleted uranium cylinders to USEC for re-enrichment as part of a five-party agreement that is extending enrichment operations at the 60-year-old plant for

  11. DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report

    National Nuclear Security Administration (NNSA)

    Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to the U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 Telephone: (865) 576-8401 Fax: (865) 576-5728 E-mail: reports@adonis.osti.gov DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report Area 3 and

  12. DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report

    National Nuclear Security Administration (NNSA)

    Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to the U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 Telephone: (865) 576-8401 Fax: (865) 576-5728 E-mail: reports@adonis.osti.gov DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report Area 3 and

  13. DOE Releases '2015 Year in Review' of Portsmouth Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Portsmouth Site DOE Releases '2015 Year in Review' of Portsmouth Site December 30, 2015 - 11:43am Addthis Crane operator Brian Lambert of Fluor-BWXT Portsmouth (FBP), DOE decontamination and decommissioning (D&D) contractor, lowers the last compressor to the operations floor recently in the X-326 uranium enrichment process building at the Portsmouth Site. The equipment removal, which is nearing completion in the X-326, includes cutting and taking out more than 7,000 separate

  14. Technical Assessment of DOE Savannah River Site-Sponsored Radionuclide Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of DOE Savannah River Site-Sponsored Radionuclide Monitoring Efforts in the Central Savannah River Area Prepared by the Savannah River Ecology Laboratory at the Request of The Department of Energy - Savannah River Site in Response to the Savannah River Site Citizens Advisory Board Recommendation 317 Submitted: June 24, 2014 Prepared By: (in alphabetical Order) Mr. Dean Fletcher (Research Professional III) Ms. Angela Lindell (Research Professional III) Dr. Gary Mills (Associate

  15. Understanding the Subsurface Reactive Transport of Transuranic Contaminants at DOE Sites

    SciTech Connect (OSTI)

    Barnett, Mark O.; Albrecht-Schmitt, Thomas E.; Saiers, James E.; Shuh, David K.

    2013-12-20

    Our primary hypothesis is that actinides can interact with surfaces in fundamentally different ways than other metals, metalloids, and oxyanions and that this fundamental difference requires new approaches to studying and modeling transuranic sorption to minerals and geomedia. This project supports a key mission of the SBR program to develop sufficient scientific understanding such that DOE sites will be able to incorporate coupled physical, chemical, and biological processes into decision making for environmental management and long-term stewardship, while also supporting DOEs commitment to education, training, and collaboration with DOE user facilities.

  16. Local drainage analyses of the Paducah and Portsmouth Gaseous Diffusion Plants during an extreme storm

    SciTech Connect (OSTI)

    Johnson, R.O.; Wang, J.C.; Lee, D.W.

    1993-11-01

    Local drainage analyses have been performed for the Paducah and Portsmouth Gaseous Diffusion Plants during an extreme storm having an approximate 10,000-yr recurrence interval. This review discusses the methods utilized to accomplish the analyses in accordance with US Department of Energy (DOE) design and evaluation guidelines, and summarizes trends, results, generalizations, and uncertainties applicable to other DOE facilities. Results indicate that some culverts may be undersized, and that the storm sewer system cannot drain the influx of precipitation from the base of buildings. Roofs have not been designed to sustain ponding when the primary drainage system is clogged. Some underground tunnels, building entrances, and ground level air intakes may require waterproofing.

  17. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance

    SciTech Connect (OSTI)

    Etnier, E.L.; Eaton, L.A. )

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms applicable'' and relevant and appropriate'' is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  18. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program

    SciTech Connect (OSTI)

    Etnier, E.L.; Eaton, L.A.

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  19. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site

    SciTech Connect (OSTI)

    N /A

    2003-11-28

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Portsmouth site in Ohio (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Portsmouth to a more stable chemical form suitable for use or disposal. The facility would also convert the DUF{sub 6} from the East Tennessee Technology Park (ETTP) site near Oak Ridge, Tennessee. In a Notice of Intent (NOI) published in the Federal Register on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (United States Code, Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (Code of Federal Regulations, Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a Federal Register Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Portsmouth site; from the transportation of all ETTP cylinders (DUF{sub 6}, low-enriched UF6 [LEU-UF{sub 6}], and empty) to Portsmouth; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). An option of shipping the ETTP cylinders to Paducah is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Portsmouth and ETTP sites. A separate EIS (DOE/EIS-0359) evaluates potential environmental impacts for the proposed Paducah conversion facility.

  20. DOE Completes Cleanup at New York, California Sites | Department of Energy

    Energy Savers [EERE]

    Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18th and 19th sites to be completely cleaned of legacy waste. This milestone was

  1. Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition

    Office of Energy Efficiency and Renewable Energy (EERE)

    Savannah River Site, Aiken, S.C. – Security Protection Officers from Savannah River Site’s (SRS) security contractor WSI-SRS, today won the Department of Energy (DOE) Secretary’s Trophy as the top DOE team in the 2012 Security Protection Officer Team Competition (SPOTC)- 2012 Carolina Challenge, held here, April 22-26. It was the 40th anniversary of the SPOTC competition.

  2. DOE/EA-1927, Paducah Gaseous Diffusion Plant Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... various species of small mammals, reptiles, and birds ... affected by retreating Pleistocene glaciers, which ... known to have occurred in North America (Figure 3-5). ...

  3. Review of Natural Phenomena Hazard (NPH) Assessments for the DOE Hanford Site

    SciTech Connect (OSTI)

    Snow, Robert L.; Ross, Steven B.

    2011-09-15

    The purpose of this review is to assess the need for updating Natural Phenomena Hazard (NPH) assessments for the DOE's Hanford Site, as required by DOE Order 420.1B Chapter IV, Natural Phenomena Hazards Mitigation, based on significant changes in state-of-the-art NPH assessment methodology or site-specific information. This review is an update and expansion to the September 2010 review of PNNL-19751, Review of Natural Phenomena Hazard (NPH) Assessments for the Hanford 200 Areas (Non-Seismic).

  4. DOE/RL-92-36, Hanford Site Hoisting and Rigging Manual ATTACHMENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATTACHMENTS February 28, 2012 Rev 1 Page 31 ATTACHMENT 2 Lifting Requirements for Concrete Blocks DOE/RL-92-36, Hanford Site Hoisting and Rigging Manual ATTACHMENTS February 28, 2012 Rev 1 Page 32 This page intentionally left blank. DOE/RL-92-36, Hanford Site Hoisting and Rigging Manual ATTACHMENTS May 2, 2013 Rev 1 Page 33 Lifting Requirements for Concrete Blocks Concrete Blocks (i.e., Ecology, Landscaping Blocks) stacked more than two high shall be evaluated for structural stability. Lifting

  5. Best Practices in Literature Research for the 10-Year Extreme Wind Update at the DOE Pantex Site

    Office of Environmental Management (EM)

    Best Practices in Literature Review for the 10 Year Extreme Wind Update at the DOE Pantex Site Presented by October 26, 2011 DOE Standards * DOE O 420.1 - Basis of Requirements * DOE 1020 - Soon to be updated * Development of several ANS consensus codes have replaced several older DOE standards New DOE 1020 for Wind NPH Analysis and Design Process * Step 1: Establish performance requirements for SSCs * Step 2: Calculate maximum NPH demands on SSCs resulting from NPH Events * Step 3: Design of

  6. DOE Order 435.1 Performance Assessment Savannah River Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level radioactive waste disposal facilities (or appropriate CERCLA documentation for a low level radioactive waste disposal facility), and are critical in determining the nature and extent of the controls that need to be put in place at the facility being evaluated. There are specific requirements for the

  7. DOE/EV-0005/10 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    0 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohio February 1979 - Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology DOE/EV-0005/10 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohii February 1979 Final Report Prepared

  8. DOE Announces Webinars on Buildings of the Future, Overcoming Wind Siting

    Office of Environmental Management (EM)

    Challenges, and More | Department of Energy Overcoming Wind Siting Challenges, and More DOE Announces Webinars on Buildings of the Future, Overcoming Wind Siting Challenges, and More April 2, 2015 - 8:42am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the clean energy workforce. Webinars are free; however, advanced registration is typically required. You can also watch archived

  9. DOE Completes Cleanup at New York, California Sites - Recovery Act funds

    Office of Environmental Management (EM)

    accelerate cleanup; support job creation and footprint reduction | Department of Energy Cleanup at New York, California Sites - Recovery Act funds accelerate cleanup; support job creation and footprint reduction DOE Completes Cleanup at New York, California Sites - Recovery Act funds accelerate cleanup; support job creation and footprint reduction July 1, 2011 - 12:00pm Addthis Media Contact 202-586-4940 WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of

  10. DOE - Office of Legacy Management -- New Brunswick NJ Site - NJ 14

    Office of Legacy Management (LM)

    Brunswick NJ Site - NJ 14 FUSRAP Considered Sites New Brunswick, NJ Alternate Name(s): New Brunswick Laboratory NJ.14-1 Location: 986 Jersey Avenue, New Brunswick, New Jersey NJ.14-2 Historical Operations: Performed radiochemical analyses on uranium, thorium, beryllium, and zirconium metals and compounds for MED, AEC, ERDA, and DOE to support nuclear power and weapons programs. NJ.14-3 NJ.14-5 Eligibility Determination: Eligible NJ.14-1 Radiological Survey(s): Assessment Surveys, Verification

  11. DOE-SPR-EIS-0075-SA-03 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND

    Office of Environmental Management (EM)

    SPR-EIS-0075-SA-03 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENTS: OPERATIONAL AND ENGINEERING MODIFICATIONS AND REGULATORY REVIEW U.S. Department of Energy Strategic Petroleum Reserve 900 Commerce Road East New Orleans, Louisiana 70123 December 2014 SUPPLEMENT ANALYSIS DETERMINATION The Department of Energy (DOE), Strategic Petroleum Reserve (SPR) Project Management Office, has prepared a Supplement Analysis (SA) to determine whether the site-wide and

  12. Characterization of candidate DOE sites for fabricating MOX fuel for lead assemblies

    SciTech Connect (OSTI)

    Holdaway, R.F.; Miller, J.W.; Sease, J.D.; Moses, R.J.; O`Connor, D.G.; Carrell, R.D.; Jaeger, C.D.; Thompson, M.L.; Strasser, A.A.

    1998-03-01

    The Office of Fissile Materials Disposition (MD) of the Department of Energy (DOE) is directing the program to disposition US surplus weapons-usable plutonium. For the reactor option for disposition of this surplus plutonium, MD is seeking to contract with a consortium, which would include a mixed-oxide (MOX) fuel fabricator and a commercial US reactor operator, to fabricate and burn MOX fuel in existing commercial nuclear reactors. This option would entail establishing a MOX fuel fabrication facility under the direction of the consortium on an existing DOE site. Because of the lead time required to establish a MOX fuel fabrication facility and the need to qualify the MOX fuel for use in a commercial reactor, MD is considering the early fabrication of lead assemblies (LAs) in existing DOE facilities under the technical direction of the consortium. The LA facility would be expected to produce a minimum of 1 metric ton heavy metal per year and must be operational by June 2003. DOE operations offices were asked to identify candidate sites and facilities to be evaluated for suitability to fabricate MOX fuel LAs. Savannah River Site, Argonne National Laboratory-West, Hanford, Lawrence Livermore National Laboratory, and Los Alamos National Laboratory were identified as final candidates to host the LA project. A Site Evaluation Team (SET) worked with each site to develop viable plans for the LA project. SET then characterized the suitability of each of the five plans for fabricating MOX LAs using 28 attributes and documented the characterization to aid DOE and the consortium in selecting the site for the LA project. SET concluded that each option has relative advantages and disadvantages in comparison with other options; however, each could meet the requirements of the LA project as outlined by MD and SET.

  13. NEW - DOE P 481.1, DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SSP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work.

  14. Department of Energy's Paducah Site Reaches Million-Hour Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental risk. The LATA Environmental Services of Kentucky Team, the Department's prime cleanup contractor, in October reached a milestone of 1 million hours without a lost...

  15. Groundwater Cleanup Progresses at Paducah Site | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vapor and water are then pumped to the surface and treated using carbon filtration, which is commonly used to adsorb volatile organic compounds, and air stripping, which uses ...

  16. Evaluation of the proposed pilot groundwater pump and treat demonstration for the Paducah Gaseous Diffusion Plant. Environmental Restoration Program

    SciTech Connect (OSTI)

    Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Hale, T.B.; Huff, D.D.; Nickelson, M.D.; Rightmire, C.T.

    1992-11-01

    This report contains the evaluation and recommendations of a Groundwater Corrective Actions Review Team. The primary goal is to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at Paducah, Kentucky. A key distinction recognized by the review team is that the proposed project is intended to be a full-scale hydraulic containment of contaminants migrating from the sources of the plume, not plume remediation. The key questions incorporated into this plan are whether (1) dense, nonaqueous-phase liquids (DNAPLS) are present in the Regional Gravel Aquifer (RGA) at the source of the plume and (2) {sup 99}Tc removal must be included as part of any groundwater treatment process. The first question cannot be answered until the contaminant sources are better defined; the second question requires further risk assessment and/or a policy decision by DOE. Technical evaluation by the review team suggests that the recommended course of action be to modify the proposed work plan to include accurate identification of the sources of contaminants and vertical distribution of contaminants within the Northwest plume before a decision is made on the preferred source-control option. If DNAPLs are not present in the RGA, removal or containment of the sources is recommended. If DNAPLs are present, then hydraulic containment will be required. Finally, the review team recognizes that it is necessary to initiate a more comprehensive analysis of sitewide remediation needs to create links between action taken for the Northwest plume and action taken for other contamination sites at PGPD.

  17. DOE Releases Request for Information/Sources Sought for Savannah River Site Liquid Waste Services

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Information (RFI) / Sources Sought for Liquid Waste services at the Savannah River Site (SRS). The current Liquid Waste services contract at SRS is held by Savannah River Remediation, LLC and expires on June 30, 2017.

  18. DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-9%OR21949 Post-Remedial Action Report for the Former Baker Brothers Site Toledd, Ohio . February 1997 . . DOWORRl949-402 POST-REMEDIAL ACTION REPORT FOR THE REMEDIAL ACTION ATTHE FORMER BAKER BROTHERS SITE TOLEDO. OHIO FEBRUARY 1997 . United States Department of Energy I OakRidgeOpcrationsOfficc Under Contract No. DE-AC059 I OR2 1949 BY Bcchtcl National, Inc. . . : ; '.' OakRldnc.Tc~~~.- ~--~-' -------m

  19. DOE/OR/20722-88 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    8 . Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 Wayne, New Jersey March 1989 Bechtel National, Inc. DOE/OR/20722-88 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 WAYNE, NEW JERSEY MARCH 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 BY R. M. Howard Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job

  20. DOE/OR/21949-370 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    949-370 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-91 OR21 949 Post-Remedial Action Report for the Removal Action at the Seymour Specialty Wire Site Seymour, Connecticut Printed on recyded/recyclable paper. @ 4.132 1890.1 January 1994 . DOE/OR/2 1949-370 POST-REMEDIAL ACTION REPORT FOR THE REMOVAL ACTION AT THE SEYMOUR SPECIALTY WIRE SITE SEYMOUR, CONNECTICUT JANUARY 1994 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract

  1. Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power

    SciTech Connect (OSTI)

    Rutherford, P.D.

    1999-09-22

    This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

  2. DOE Releases Notification of an Industry Day and One-on-One Sessions for Savannah River Site Liquid Waste Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued notice of an Industry Day for Liquid Waste Services at the Savannah River Site (SRS).

  3. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation Conference for Savannah River Site Liquid Waste Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for liquid waste services at the Savannah River Site (SRS).

  4. Sites Pending Transfer to LM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sites Pending Transfer to LM Sites Pending Transfer to LM Sites Pending Transfer to Legacy Management Note: The following list is subject to change without prior notice and will be updated periodically. California Energy Technology Engineering Center Site Colorado Cañon City Disposal Site Durita Disposal Site Uravan Disposal Site Connecticut Windsor Site Indiana Ft. Wayne Site Iowa Middletown Site Kentucky Paducah Site Massachusetts Attleboro Site Maryland Curtis Bay Site Missouri Berkeley Site

  5. Geology Report: Area 3 Radioactive Waste Management Site DOE/Nevada Test Site, Nye County, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2006-07-01

    Surficial geologic studies near the Area 3 Radioactive Waste Management Site (RWMS) were conducted as part of a site characterization program. Studies included evaluation of the potential for future volcanism and Area 3 fault activity that could impact waste disposal operations at the Area 3 RWMS. Future volcanic activity could lead to disruption of the Area 3 RWMS. Local and regional studies of volcanic risk indicate that major changes in regional volcanic activity within the next 1,000 years are not likely. Mapped basalts of Paiute Ridge, Nye Canyon, and nearby Scarp Canyon are Miocene in age. There is a lack of evidence for post-Miocene volcanism in the subsurface of Yucca Flat, and the hazard of basaltic volcanism at the Area 3 RWMS, within the 1,000-year regulatory period, is very low and not a forseeable future event. Studies included a literature review and data analysis to evaluate unclassified published and unpublished information regarding the Area 3 and East Branch Area 3 faults mapped in Area 3 and southern Area 7. Two trenches were excavated along the Area 3 fault to search for evidence of near-surface movement prior to nuclear testing. Allostratigraphic units and fractures were mapped in Trenches ST02 and ST03. The Area 3 fault is a plane of weakness that has undergone strain resulting from stress imposed by natural events and underground nuclear testing. No major vertical displacement on the Area 3 fault since the Early Holocene, and probably since the Middle Pleistocene, can be demonstrated. The lack of major displacement within this time frame and minimal vertical extent of minor fractures suggest that waste disposal operations at the Area 3 RWMS will not be impacted substantially by the Area 3 fault, within the regulatory compliance period. A geomorphic surface map of Yucca Flat utilizes the recent geomorphology and soil characterization work done in adjacent northern Frenchman Flat. The approach taken was to adopt the map unit boundaries (line work) of Swadley and Hoover (1990) and re-label these with map unit designations like those in northern Frenchman Flat (Huckins-Gang et al, 1995a,b,c; Snyder et al, 1995a,b,c,d).

  6. Paducah Gaseous Diffusion Plant environmental report for 1992

    SciTech Connect (OSTI)

    Horak, C.M.

    1993-09-01

    This two-part report, Paducah Gaseous Diffusion Plant Environmental Report for 1992, is published annually. It reflects the results of an environmental monitoring program designed to quantify potential increases in the concentration of contaminants and potential doses to the resident human population. The Paducah Gaseous Diffusion Plant (PGDP) overall goal for environmental management is to protect the environment and PGDP`s neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, reduce the generation of waste, and minimize hazardous waste by substitution of materials.

  7. Geographic Information System Tools for Management of US DOE Sites - 13489

    SciTech Connect (OSTI)

    Carpenter, Cliff; Pilz, Elaine; Pawel, Steve

    2013-07-01

    The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

  8. An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee

    SciTech Connect (OSTI)

    Jackson, G.D.

    1987-10-01

    The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal.

  9. Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne

    SciTech Connect (OSTI)

    2000-09-01

    OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

  10. DOE/OR/20722-84 Formerly Utilized Sites Remedial Action Program

    Office of Legacy Management (LM)

    ur/ /1-( DOE/OR/20722-84 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-81 OR2A7 22 IPOST-RE M ED"LA'KtrACTI O N R EPORT FOR i ; , , i ' l : l ' - . . - r r r ^ A ^ R ^ l - l r I A F f - F A F f A A F 6 l T F i'. THE NIAGARA FALLS STORAGE SITE IICINITY PROPERTIES 1983 AND 1984 Lewistoh, New York December 1986 Bechtel lrlatbnal, Ine DOE/OR/ 207 22-8 4 P O S T - R E M E D I A L A C T I O N R E P O R T F O R T H E N ] A G A R A F A L L S S T O R A G E S I T E V I

  11. Errata Sheet for Nevada National Security Site Environmental Report Summary 2011, DOE/NV/25946--1604-SUM

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Errata Sheet for Nevada National Security Site Environmental Report Summary 2011, DOE/NV/25946--1604-SUM Errata issued July 2013 ERRATA SHEET Issue Date: July 2013 The Following Corrections Apply to: Nevada National Security Site Environmental Report Summary 2011 DOE Document Number: DOE/NV/25946--1604-SUM Document Date: September 2012 The corrections shown below have been made in the subject document. Page 18, middle column, first complete paragraph, first sentence: 117.427 changed to 121.427

  12. Soil washing as a potential remediation technology for contaminated DOE sites

    SciTech Connect (OSTI)

    Devgun, J.S.; Beskid, N.J. ); Natsis, M.E. ); Walker, J.S. )

    1993-01-01

    Frequently detected contaminants at US Department of Energy (DOE) sites include radionuclides, heavy metals, and chlorinated hydrocarbons. Remediation of these sites requires application of several technologies used in concert with each other, because no single technology is universally applicable. Special situations, such as mixed waste, generally require innovative technology development. This paper, however, focuses on contaminated soils, for which soil washing and vitrification technologies appear to have wide ranging application potential. Because the volumes of contaminated soils around the DOE complex are so large, soil washing can offer a potentially inexpensive way to effect remediation or to attain waste volume reduction. As costs for disposal of low-level and mixed wastes continue to rise, it is likely that volume-reduction techniques and in-situ containment techniques will become increasingly important. This paper reviews the status of the soil washing technology, examines the systems that are currently available, and discusses the potential application of this technology to some DOE sites, with a focus on radionuclide contamination and, primarily, uranium-contaminated soils

  13. Soil washing as a potential remediation technology for contaminated DOE sites

    SciTech Connect (OSTI)

    Devgun, J.S.; Beskid, N.J.; Natsis, M.E.; Walker, J.S.

    1993-03-01

    Frequently detected contaminants at US Department of Energy (DOE) sites include radionuclides, heavy metals, and chlorinated hydrocarbons. Remediation of these sites requires application of several technologies used in concert with each other, because no single technology is universally applicable. Special situations, such as mixed waste, generally require innovative technology development. This paper, however, focuses on contaminated soils, for which soil washing and vitrification technologies appear to have wide ranging application potential. Because the volumes of contaminated soils around the DOE complex are so large, soil washing can offer a potentially inexpensive way to effect remediation or to attain waste volume reduction. As costs for disposal of low-level and mixed wastes continue to rise, it is likely that volume-reduction techniques and in-situ containment techniques will become increasingly important. This paper reviews the status of the soil washing technology, examines the systems that are currently available, and discusses the potential application of this technology to some DOE sites, with a focus on radionuclide contamination and, primarily, uranium-contaminated soils

  14. DOE-STD-1024-92; DOE Standard Guidelines For Use of Probabilistic Seismic Hazard Curves at Department of Energy Sites for Department of Energy Facilities

    Office of Environmental Management (EM)

    STD-1024-92 December 1992 Change Notice #1 January 1996 DOE STANDARD GUIDELINES FOR USE OF PROBABILISTIC SEISMIC HAZARD CURVES AT DEPARTMENT OF ENERGY SITES FOR DEPARTMENT OF ENERGY FACILITIES U.S. Department of Energy AREA FACR Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information,

  15. Rocketdyne Propulsion and Power DOE Operations annual site environmental report 1997

    SciTech Connect (OSTI)

    Robinson, K.S.

    1998-11-23

    This annual report discusses environmental monitoring at two manufacturing and test sites operated in the Los Angeles area by Rocketdyne Propulsion and Power of Boeing North American, Inc. These are identified as Area 4 of the SSFL and the De Soto site. These sites have been used for research and development (R and D), engineering, and testing in a broad range of technical fields primarily in energy research and nuclear reactor technology. The De Soto site had research and development laboratories involved with nuclear research. This work was terminated in 1995 and only D and D activities will have potential for impact on the environment. Since 1956, Area 4 has been used for work with nuclear materials, including fabricating nuclear reactor fuels, testing nuclear reactors, and dissembling used fuel elements. This work ended in 1988 and subsequent efforts have been directed toward decommissioning and decontamination of the former nuclear facilities. The primary purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies responsible for oversight. Information presented here concentrates on Area 4 at SSFL, which is the only area at SSFL where DOE operations were performed.

  16. TECHNICAL ASSESSMENT OF FRACTIONAL CRYSTALLIZATION FOR TANK WASTE PRETREATMENT AT THE DOE HANFORD SITE

    SciTech Connect (OSTI)

    HAMILTON, D.W.

    2006-01-03

    Radioactive wastes from one hundred seventy-seven underground storage tanks in the 200 Area of the Department of Energy (DOE) Hanford Site in Washington State will be retrieved, treated and stored either on site or at an approved off-site repository. DOE is currently planning to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions, which would be treated and permanently disposed in separate facilities. A significant volume of the wastes in the Hanford tanks is currently classified as medium Curie waste, which will require separation and treatment at the Waste Treatment Plant (WTP). Because of the specific challenges associated with treating this waste stream, DOE EM-21 funded a project to investigate the feasibility of using fractional crystallization as a supplemental pretreatment technology. The two process requirements for fractional crystallization to be successfully applied to Hanford waste include: (1) evaporation of water from the aqueous solution to enrich the activity of soluble {sup 137}Cs, resulting in a higher activity stream to be sent to the WTP, and (2) separation of the crystalline salts that are enriched in sodium, carbonate, sulfate, and phosphate and sufficiently depleted in {sup 137}Cs, to produce a second stream to be sent to Bulk Vitrification. Phase I of this project has just been completed by COGEMA/Georgia Institute of Technology. The purpose of this report is to document an independent expert review of the Phase I results with recommendations for future testing. A team of experts with significant experience at both the Hanford and Savannah River Sites was convened to conduct the review at Richland, Washington the week of November 14, 2005.

  17. Operating limit study for the proposed solid waste landfill at Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Lee, D.W.; Wang, J.C.; Kocher, D.C.

    1995-06-01

    A proposed solid waste landfill at Paducah Gaseous Diffusion Plant (PGDP) would accept wastes generated during normal operations that are identified as non-radioactive. These wastes may include small amounts of radioactive material from incidental contamination during plant operations. A site-specific analysis of the new solid waste landfill is presented to determine a proposed operating limit that will allow for waste disposal operations to occur such that protection of public health and the environment from the presence of incidentally contaminated waste materials can be assured. Performance objectives for disposal were defined from existing regulatory guidance to establish reasonable dose limits for protection of public health and the environment. Waste concentration limits were determined consistent with these performance objectives for the protection of off-site individuals and inadvertent intruders who might be directly exposed to disposed wastes. Exposures of off-site individuals were estimated using a conservative, site-specific model of the groundwater transport of contamination from the wastes. Direct intrusion was analyzed using an agricultural homesteader scenario. The most limiting concentrations from direct intrusion or groundwater transport were used to establish the concentration limits for radionuclides likely to be present in PGDP wastes.

  18. DOE Research Set-Aside Areas of the Savannah River Site

    SciTech Connect (OSTI)

    Davis, C.E.; Janecek, L.L.

    1997-08-31

    Designated as the first of seven National Environmental Research Parks (NERPs) by the Atomic Energy Commission (now the Department of Energy), the Savannah River Site (SRS) is an important ecological component of the Southeastern Mixed Forest Ecoregion located along the Savannah River south of Aiken, South Carolina. Integral to the Savannah River Site NERP are the DOE Research Set-Aside Areas. Scattered across the SRS, these thirty tracts of land have been set aside for ecological research and are protected from public access and most routine Site maintenance and forest management activities. Ranging in size from 8.5 acres (3.44 ha) to 7,364 acres (2,980 ha), the thirty Set-Aside Areas total 14,005 acres (5,668 ha) and comprise approximately 7% of the Site`s total area. This system of Set-Aside Areas originally was established to represent the major plant communities and habitat types indigenous to the SRS (old-fields, sandhills, upland hardwood, mixed pine/hardwood, bottomland forests, swamp forests, Carolina bays, and fresh water streams and impoundments), as well as to preserve habitats for endangered, threatened, or rare plant and animal populations. Many long-term ecological studies are conducted in the Set-Asides, which also serve as control areas in evaluations of the potential impacts of SRS operations on other regions of the Site. The purpose of this document is to give an historical account of the SRS Set-Aside Program and to provide a descriptive profile of each of the Set-Aside Areas. These descriptions include a narrative for each Area, information on the plant communities and soil types found there, lists of sensitive plants and animals documented from each Area, an account of the ecological research conducted in each Area, locator and resource composition maps, and a list of Site-Use permits and publications associated with each Set-Aside.

  19. DOE/EA-1605: Environmental Assessment for Biomass Cogeneration and Heating Facilities at the Savannah River Site (August 2008)

    Office of Environmental Management (EM)

    EA-1605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE This page intentionally left blank - i - TABLE OF CONTENTS Page 1.0 INTRODUCTION

  20. Interim Safe Storage of Plutonium Production Reactors at the US DOE Hanford Site - 13438

    SciTech Connect (OSTI)

    Schilperoort, Daryl L.; Faulk, Darrin

    2013-07-01

    Nine plutonium production reactors located on DOE's Hanford Site are being placed into an Interim Safe Storage (ISS) period that extends to 2068. The Environmental Impact Statement (EIS) for ISS [1] was completed in 1993 and proposed a 75-year storage period that began when the EIS was finalized. Remote electronic monitoring of the temperature and water level alarms inside the safe storage enclosure (SSE) with visual inspection inside the SSE every 5 years are the only planned operational activities during this ISS period. At the end of the ISS period, the reactor cores will be removed intact and buried in a landfill on the Hanford Site. The ISS period allows for radioactive decay of isotopes, primarily Co-60 and Cs-137, to reduce the dose exposure during disposal of the reactor cores. Six of the nine reactors have been placed into ISS by having an SSE constructed around the reactor core. (authors)

  1. Collaboration and Communication: DOE and Navajo Nation Tour Uranium Mine Reclamation Sites to Share Expertise and Experiences

    Broader source: Energy.gov [DOE]

    In February 2014, U.S. Department of Energy (DOE) Office of Legacy Management (LM) and LM Support (LMS) contractor site managers, along with Navajo Nation technical staff, visited five reclaimed...

  2. Best Practices in Literature Review for the 10 Year Extreme Wind Update at the DOE Pantex Site

    Broader source: Energy.gov [DOE]

    Best Practices in Literature Review for the 10 Year Extreme Wind Update at the DOE Pantex Site Presented by B&W Technical Services, Pantex, Pro2Serve and EKU October 26, 2011

  3. Rocketdyne Propulsion and Power DOE operations annual site environmental report 1996

    SciTech Connect (OSTI)

    Tuttle, R.J.

    1997-11-10

    Rocketdyne currently operates several facilities in the San Fernando Valley/Simi Valley area, for manufacturing, testing, and research and development (R and D). These operations include manufacturing liquid-fueled rocket engines, such as the Space Shuttle Main Engine (SSME) and engines used for expendable launch vehicles used to place artificial satellites into orbit. This work includes fabrication and testing of rocket engines, lasers, and heat-transfer systems; and R and D in a wide range of high-technology fields, such as the electrical power system for the Space Station. Previously, this work also included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International Division (AI). AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. This nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. The majority of this work is done for the Department of Energy (DOE). This Annual Site Environmental Report for 1996 concentrates on the environmental conditions related to DOE operations at Area IV of SSFL and at De Soto.

  4. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  5. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  6. DEMONSTRATiON OF A SUBSURFACE CONTAINMENT SYSTEM FOR INSTALLATION AT DOE WASTE SITES

    SciTech Connect (OSTI)

    Thomas J. Crocker; Verna M. Carpenter

    2003-05-21

    Between 1952 and 1970, DOE buried mixed waste in pits and trenches that now have special cleanup needs. The disposal practices used decades ago left these landfills and other trenches, pits, and disposal sites filled with three million cubic meters of buried waste. This waste is becoming harmful to human safety and health. Today's cleanup and waste removal is time-consuming and expensive with some sites scheduled to complete cleanup by 2006 or later. An interim solution to the DOE buried waste problem is to encapsulate and hydraulically isolate the waste with a geomembrane barrier and monitor the performance of the barrier over its 50-yr lifetime. The installed containment barriers would isolate the buried waste and protect groundwater from pollutants until final remediations are completed. The DOE has awarded a contract to RAHCO International, Inc.; of Spokane, Washington; to design, develop, and test a novel subsurface barrier installation system, referred to as a Subsurface Containment System (SCS). The installed containment barrier consists of commercially available geomembrane materials that isolates the underground waste, similar to the way a swimming pools hold water, without disrupting hazardous material that was buried decades ago. The barrier protects soil and groundwater from contamination and effectively meets environmental cleanup standards while reducing risks, schedules, and costs. Constructing the subsurface containment barrier uses a combination of conventional and specialized equipment and a unique continuous construction process. This innovative equipment and construction method can construct a 1000-ft-long X 34-ft-wide X 30-ft-deep barrier at construction rates to 12 Wday (8 hr/day operation). Life cycle costs including RCRA cover and long-term monitoring range from approximately $380 to $590/cu yd of waste contained or $100 to $160/sq ft of placed barrier based upon the subsurface geology surrounding the waste. Project objectives for Phase I were to validate the SCS construction equipment and process, evaluate the system performance, validate the barrier constructability, and assess the barrier effectiveness. The objectives for Phase 11, which is a full-scale demonstration at a DOE site, are to perform an extensive characterization of the test site, to demonstrate the equipment and the installation process under site-specific performance and regulatory requirements, to validate the operational performance of the equipment, and to perform long-term verification of the barrier using monitoring wells. To date, significant progress has been made to establish the technical and economical feasibility of the SCS. This report describes the SCS conventional and specialized equipment, barrier materials, and construction process. It presents results of the specialized equipment Factory Test, the SCS Control Test and the SCS Advance Control Test at the RAHCO facility. Provided herein are the system performance capabilities and an estimated construction cost and schedule for a 1000-ft-long X 34-ft-wide X 29-ft-deep containment barrier at the DOE Oak Ridge Bear Creek Burial Grounds are also provided.

  7. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

  8. Site specific seismic hazard analysis at the DOE Kansas City Plant

    SciTech Connect (OSTI)

    Lynch, D.T.; Drury, M.A.; Meis, R.C.; Bieniawski, A.; Savy, J.B.; Llopis, J.L.; Constantino, C.; Hashimoto, P.S.; Campbell, K.W.

    1995-10-01

    A site specific seismic hazard analysis is being conducted for the Kansas City Plant to support an on-going structural evaluation of existing buildings. This project is part of the overall review of facilities being conducted by DOE. The seismic hazard was probabilistically defined at the theoretical rock outcrop by Lawrence Livermore National Laboratory. The USArmy Engineer Waterways Experiment Station conducted a subsurface site investigation to characterize in situ S-wave velocities and other subsurface physical properties related to the geology in the vicinity of the Main Manufacturing Building (MMB) at the Bannister Federal Complex. The test program consisted of crosshole S-wave, seismic cone penetrometer testing,and laboratory soil analyses. The information acquired from this investigation was used in a site response analysis by City College of New York to determine the earthquake motion at grade. Ground response spectra appropriate for design and evaluation of Performance Category 1 and 2 structures, systems, and components were recommended. Effects of seismic loadings on the buildings will be used to aid in designing any structural modifications.

  9. DOE - Office of Legacy Management -- Falls City Mill Site - TX 04

    Office of Legacy Management (LM)

    Mill Site - TX 04 FUSRAP Considered Sites Site: Falls City Mill Site (TX.04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Falls City, Texas, Disposal Site Documents Related to Falls City Mill Site Data Validation Package for the April 2009 Groundwater Sampling at the Falls City, Texas, Disposal Site. June 2009 2014 Annual Site

  10. DOE - Office of Legacy Management -- Maybell Mill Site - CO 0-07

    Office of Legacy Management (LM)

    Maybell Mill Site - CO 0-07 FUSRAP Considered Sites Site: Maybell Mill Site (CO.0-07) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Maybell, Colorado, Disposal Site Documents Related to Maybell Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Maybell,

  11. DOE - Office of Legacy Management -- Mexican Hat Mill Site - UT 0-02A

    Office of Legacy Management (LM)

    Mill Site - UT 0-02A FUSRAP Considered Sites Site: Mexican Hat Mill Site (UT.0-02A) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Mexican Hat, Utah, Disposal Site Documents Related to Mexican Hat Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Mexican

  12. DOE - Office of Legacy Management -- Project Gas Buggy Site - NM 14

    Office of Legacy Management (LM)

    Gas Buggy Site - NM 14 FUSRAP Considered Sites Site: Project Gas Buggy Site (NM.14 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gasbuggy, New Mexico, Site Nevada Test Site History Documents Related to Project Gas Buggy Site Fact Sheet Gasbuggy, New Mexico The Gasbuggy Site is located in northwestern New Mexico in Rio Arriba County

  13. DOE - Office of Legacy Management -- Rifle Mill Site - CO 0-11

    Office of Legacy Management (LM)

    Rifle Mill Site - CO 0-11 FUSRAP Considered Sites Site: Rifle Mill Site (CO.0-11 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Rifle, Colorado, New Processing Site Rifle, Colorado, Old Processing Site Documents Related to Rifle Mill Site 2009 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites;

  14. DOE - Office of Legacy Management -- Rio Algom Lisbon Valley Site - 035

    Office of Legacy Management (LM)

    Rio Algom Lisbon Valley Site - 035 FUSRAP Considered Sites Site: Rio Algom Lisbon Valley Site (035 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Utah. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill

  15. DOE - Office of Legacy Management -- Spook Site - WY 0-01

    Office of Legacy Management (LM)

    Spook Site - WY 0-01 FUSRAP Considered Sites Site: Spook Site (WY.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Documents Related to Spook Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Spook, Wyoming, Disposal Site. LMS/S12245. March 2015 U.S.

  16. DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL

    Office of Legacy Management (LM)

    548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1990 Weldon Spring Site Remedial Action Project Weldon Spring, Missouri SEPTEMBER 1991 U.S. Department of Energy Oak Ridge Operations Office Weldon Spring Site Remedial Action Project REV. 1 DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1990 Weldon Spring Site Remedial Action Project Weldon Spring, Missouri SEPTEMBER 1991 U.S. Department of Energy Oak

  17. DOE - Office of Legacy Management -- Tatum Salt Dome Test Site - MS 01

    Office of Legacy Management (LM)

    Tatum Salt Dome Test Site - MS 01 FUSRAP Considered Sites Site: Tatum Salt Dome Test Site (MS.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Documents Related to Tatum Salt Dome Test Site

  18. Ms. Judy Clayton, Chair Paducah Citizens Advisory Board EHI Consultants, Inc.

    Office of Environmental Management (EM)

    0 Ms. Judy Clayton, Chair Paducah Citizens Advisory Board EHI Consultants, Inc. 1 1 1 Memorial Drive Paducah, Kentucky 4200 1 Dear Ms. Clayton: Thank you for your recent letter providing a recommendation to include option periods in Department of Energy Requests for Proposals for prime contracts. The Federal Acquisition Regulation (FAR) provides the total of the basic and option period of a contract for services shall not exceed 5 years, unless approved in accordance with agency procedures. In

  19. FTCP Site Specific Information | Department of Energy

    Energy Savers [EERE]

    Site Specific Information FTCP Site Specific Information Site Specific Information (including staffing analyses, TQP Accreditation Reports and TQP Self-Assessments) EM Sites Carlsbad Field Office EM Consolidated Business Center Oak Ridge Office of EM Office of River Protection Portsmouth Paducah Project Office Richland Operations Office Savannah River Operations Office West Valley EM HQ NNSA Sites Kansas City Field Office Livermore Field Office Los Alamos Field Office Nevada Field Office NNSA

  20. DOE - Office of Legacy Management -- Gunnison Mill Site - CO 0-06

    Office of Legacy Management (LM)

    Gunnison Mill Site - CO 0-06 FUSRAP Considered Sites Site: Gunnison Mill Site (CO.0-06 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gunnison, Colorado, Processing Site Documents Related to Gunnison Mill Site Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado.

  1. DOE - Office of Legacy Management -- Naturita Mill Site - CO 0-08

    Office of Legacy Management (LM)

    Naturita Mill Site - CO 0-08 FUSRAP Considered Sites Site: Naturita Mill Site (CO.0-08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Naturita Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data

  2. DOE - Office of Legacy Management -- Palos Park Forest Preserve Site (A

    Office of Legacy Management (LM)

    Plot M) - IL 04 Palos Park Forest Preserve Site (A Plot M) - IL 04 FUSRAP Considered Sites Site: Palos Park Forest Preserve Site (A/Plot M) (IL.04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Site A/Plot M, Illinois, Decommissioned Reactor Site Documents Related to Palos Park Forest Preserve Site (A/Plot M) Surveillance of

  3. DOE - Office of Legacy Management -- Slick Rock Mill Site - CO 08

    Office of Legacy Management (LM)

    Slick Rock Mill Site - CO 08 FUSRAP Considered Sites Site: Slick Rock Mill Site (CO.08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Slick Rock, Colorado, Processing Site Documents Related to Slick Rock Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal

  4. DOE - Office of Legacy Management -- Tuba City Mill Site - AZ 0-02

    Office of Legacy Management (LM)

    Mill Site - AZ 0-02 FUSRAP Considered Sites Site: Tuba City Mill Site (AZ.0-02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Tuba City, Arizona, Disposal Site Documents Related to Tuba City Mill Site 2014 Navajo Nation Five-Year Plan 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act

  5. DOE - Office of Legacy Management -- West Milton Reactor Site - NY 21

    Office of Legacy Management (LM)

    Milton Reactor Site - NY 21 FUSRAP Considered Sites Site: West Milton Reactor Site (NY.21) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their

  6. DOE - Office of Legacy Management -- Ambrosia Lake Mill Site - NM 0-01

    Office of Legacy Management (LM)

    Ambrosia Lake Mill Site - NM 0-01 FUSRAP Considered Sites Site: Ambrosia Lake Mill Site (NM.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Ambrosia Lake Mill Site Documents Related to Ambrosia Lake Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal

  7. DOE - Office of Legacy Management -- Durango Mill Site - CO 0-05

    Office of Legacy Management (LM)

    Durango Mill Site - CO 0-05 FUSRAP Considered Sites Site: Durango Mill Site (CO.0-05 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Durango, Colorado, Processing Site Documents Related to Durango Mill Site 2005 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal

  8. SOFTWARE QUALITY ASSURANCE FOR EMERGENCY RESPONSE CONSEQUENCE ASSESSMENT MODELS AT DOE'S SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Hunter, C

    2007-12-17

    The Savannah River National Laboratory's (SRNL) Atmospheric Technologies Group develops, maintains, and operates computer-based software applications for use in emergency response consequence assessment at DOE's Savannah River Site. These applications range from straightforward, stand-alone Gaussian dispersion models run with simple meteorological input to complex computational software systems with supporting scripts that simulate highly dynamic atmospheric processes. A software quality assurance program has been developed to ensure appropriate lifecycle management of these software applications. This program was designed to meet fully the overall structure and intent of SRNL's institutional software QA programs, yet remain sufficiently practical to achieve the necessary level of control in a cost-effective manner. A general overview of this program is described.

  9. Transuranic Contamination in Sediment and Groundwater at the U.S. DOE Hanford Site

    SciTech Connect (OSTI)

    Cantrell, Kirk J.

    2009-08-20

    A review of transuranic radionuclide contamination in sediments and groundwater at the DOE’s Hanford Site was conducted. The review focused primarily on plutonium-239/240 and americium-241; however, other transuranic nuclides were discussed as well, including neptunium-237, plutonium-238, and plutonium-241. The scope of the review included liquid process wastes intentionally disposed to constructed waste disposal facilities such as trenches and cribs, burial grounds, and unplanned releases to the ground surface. The review did not include liquid wastes disposed to tanks or solid wastes disposed to burial grounds. It is estimated that over 11,800 Ci of plutonium-239, 28,700 Ci of americium-241, and 55 Ci of neptunium-237 have been disposed as liquid waste to the near surface environment at the Hanford Site. Despite the very large quantities of transuranic contaminants disposed to the vadose zone at Hanford, only minuscule amounts have entered the groundwater. Currently, no wells onsite exceed the DOE derived concentration guide for plutonium-239/240 (30 pCi/L) or any other transuranic contaminant in filtered samples. The DOE derived concentration guide was exceeded by a small fraction in unfiltered samples from one well (299-E28-23) in recent years (35.4 and 40.4 pCi/L in FY 2006). The primary reason that disposal of these large quantities of transuranic radionuclides directly to the vadose zone at the Hanford Site has not resulted in widespread groundwater contamination is that under the typical oxidizing and neutral to slightly alkaline pH conditions of the Hanford vadose zone, transuranic radionuclides (plutonium and americium in particular) have a very low solubility and high affinity for surface adsorption to mineral surfaces common within the Hanford vadose zone. Other important factors are the fact that the vadose zone is typically very thick (hundreds of feet) and the net infiltration rate is very low due to the desert climate. In some cases where transuranic radionuclides have been co-disposed with acidic liquid waste, transport through the vadose zone for considerable distances has occurred. For example, at the 216-Z-9 Crib, plutonium-239 and americium-241 have moved to depths in excess of 36 m (118 ft) bgs. Acidic conditions increase the solubility of these contaminants and reduce adsorption to mineral surfaces. Subsequent neutralization of the acidity by naturally occurring calcite in the vadose zone (particularly in the Cold Creek unit) appears to have effectively stopped further migration. The vast majority of transuranic contaminants disposed to the vadose zone on the Hanford Site (10,200 Ci [86%] of plutonium-239; 27,900 Ci [97%] of americium-241; and 41.8 Ci [78%] of neptunium-237) were disposed in sites within the PFP Closure Zone. This closure zone is located within the 200 West Area (see Figures 1.1 and 3.1). Other closure zones with notably high quantities of transuranic contaminant disposal include the T Farm Zone with 408 Ci (3.5%) plutonium-239, the PUREX Zone with 330 Ci (2.8%) plutonium-239, 200-W Ponds Zone with 324 Ci (2.8%) plutonium-239, B Farm Zone with 183 Ci (1.6%) plutonium-239, and the REDOX Zone with 164 Ci (1.4%) plutonium 239. Characterization studies for most of the sites reviewed in the document are generally limited. The most prevalent characterization methods used were geophysical logging methods. Characterization of a number of sites included laboratory analysis of borehole sediment samples specifically for radionuclides and other contaminants, and geologic and hydrologic properties. In some instances, more detailed research level studies were conducted. Results of these studies were summarized in the document.

  10. DOE - Office of Legacy Management -- Green River Mill Site - UT 0-01

    Office of Legacy Management (LM)

    Green River Mill Site - UT 0-01 FUSRAP Considered Sites Site: Green River Mill Site (UT.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Green River, Utah, Disposal Site Documents Related to Green River Mill Site Data Validation Package for the June 2009 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal

  11. DOE - Office of Legacy Management -- Monument Valley Mill Site - AZ 0-01

    Office of Legacy Management (LM)

    Monument Valley Mill Site - AZ 0-01 FUSRAP Considered Sites Site: Monument Valley Mill Site (AZ.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monument Valley, Arizona, Processing Site Documents Related to Monument Valley Mill Site Data Validation Package for the June 2009 Water Sampling at the Monument Valley, Arizona,

  12. DOE - Office of Legacy Management -- Central Nevada Test Site - NV 02

    Office of Legacy Management (LM)

    Central Nevada Test Site - NV 02 FUSRAP Considered Sites Site: Central Nevada Test Site (NV.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Central Nevada Test Area (CNTA), Nevada, Site Documents Related to Central Nevada Test Site Public Involvement Plan Post-Closure Inspection and Monitoring Report for Corrective Action Unit

  13. Rocketdyne Propulsion and Power. DOE Operations Annual Site Environmental Report, 1997

    SciTech Connect (OSTI)

    Robinson, K. S.

    1998-11-23

    This .Annual Site Environmental Report for 1997 concentrates on the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory) (SSFL) and De Soto facilities. In the past. these operations included development. fabrication. and disassembly of nuclear reactors, reactor fuel and other radioactive materials, under the Atomics International Division (AI). Other activities included the operation of large scale liquid metal facilities for the testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC). a government owned company operated, test facility within Area IV. .AI was merged into Rocketdyne in 1981 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently. all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large scale D&D activities of the sodium test facilities began in 1996.

  14. Site Environmental Report for Calendar Year 2003 DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect (OSTI)

    Liu, Ning; Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2004-09-30

    This Annual Site Environmental Report (ASER) for 2003 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing Rocketdynes Santa Susana Field Laboratory (SSFL). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2003 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  15. EMP Attachment 1 DOE-SC PNNL Site Sampling and Analysis Plan

    SciTech Connect (OSTI)

    Meier, Kirsten M.

    2011-11-10

    This Sampling and Analysis Plan (SAP) is written for the radiological environmental air surveillance program for the DOE-SC PNNL Site, Richland Washington. It provides the requirements for planning sampling events, and the requirements imposed on the analytical laboratory analyzing the air samples. The actual air sampling process is in procedure EPRP-AIR-029. The rationale for analyte selection, media, and sampling site location has been vetted through the data quality objectives (DQO) process (Barnett et al. 2010). The results from the DQO process have been reviewed and approved by the Washington State Department of Health. The DQO process (Barnett et al. 2010) identified seven specific radionuclides for analysis along with the need for gross alpha and gross beta radiological analyses. The analytes are {sup 241}Am, {sup 243}Am, {sup 244}Cm, {sup 60}Co, {sup 238}Pu, {sup 239}Pu, and {sup 233}U. The report also determined that air samples for particulates are the only sample matrix required for the monitoring program. These samples are collected on 47-mm glass-fiber filters.

  16. Paducah Gaseous Diffusion Plant environmental report for 1989

    SciTech Connect (OSTI)

    Turner, J.W. )

    1990-10-01

    This two-part environmental report is published annually. It reflects the results of a comprehensive, year-round program to monitor the impact of operations at Paducah Gaseous Diffusion Plant (PGDP) on the area's groundwater and surface waters, soil, air quality, vegetation, and wildlife. In addition, an assessment of the effect of PGDP effluents on the resident human population is made. PGDP's overall goal for environmental management is to protect the environment and PGDP's neighbors and to maintain full compliance with all current regulations. The current environmental strategy is to identify any deficiencies and to develop a system to resolve them. The long-range goal of environmental management is to minimize the source of pollutants, to reduce the formation of waste, and to minimize hazardous waste by substitution of materials. 36 refs.

  17. A TECHNICAL ASSESSMENT OF THE CURRENT WATER POLICY BOUNDARY AT U.S. DEPARTMENT OF ENERGY, PADUCAH GASEOUS DIFFUSION PLANT, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    2012-12-13

    In 1988, groundwater contaminated with trichloroethene (TCE) and technetium-99 (Tc-99) was identified in samples collected from residential water wells withdrawing groundwater from the Regional Gravel Aquifer (RGA) north of the Paducah Gaseous Diffusion Plant (PGDP) facility. In response, the U.S. Department of Energy (DOE) provided temporary drinking water supplies to approximately 100 potentially affected residents by initially supplying bottled water, water tanks, and water-treatment systems, and then by extending municipal water lines, all at no cost, to those persons whose wells could be affected by contaminated groundwater. The Water Policy boundary was established in 1993. In the Policy, DOE agreed to pay the reasonable monthly cost of water for homes and businesses and, in exchange, many of the land owners signed license agreements committing to cease using the groundwater via rural water wells. In 2012, DOE requested that Oak Ridge Associated Universities (ORAU), managing contractor of Oak Ridge Institute for Science and Education (ORISE), provide an independent assessment of the quality and quantity of the existing groundwater monitoring data and determine if there is sufficient information to support a modification to the boundary of the current Water Policy. As a result of the assessment, ORAU concludes that sufficient groundwater monitoring data exists to determine that a shrinkage and/or shift of the plume(s) responsible for the initial development of this policy has occurred. Specifically, there is compelling evidence that the TCE plume is undergoing shrinkage due to natural attenuation and associated degradation. The plume shrinkage (and migration) has also been augmented in local areas where large volumes of groundwater were recovered by pump-and treat remedial systems along the eastern and western boundaries of the Northwest Plume, and in other areas where pump-and-treat systems have been deployed by DOE to remove source contaminants. The available evidence supports adjusting the western and northwestern Water Policy boundary. Based on the historical and modeled hydrogeological data reflecting past flow and plume attenuation, along with associated plume migration toward the northeast, the establishment of a new boundary along the westernmost margin of the earliest indication of the TCE plume is proposed and justified on hydrogeological grounds. Approximately 30% of the original area would remain within the adjusted Water Policy area west and northwest of the PGDP facility. This modification would release about 70% of the area, although individual properties would overlap the new boundary.

  18. THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

    SciTech Connect (OSTI)

    JEWETT MA

    2011-01-14

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  19. DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999

    Office of Environmental Management (EM)

    here to return to the Main Menu Volume I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Summary COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information concerning the Final

  20. DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999

    Office of Environmental Management (EM)

    I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Click here to return to the Main Menu Comments and Responses COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information