  1. DOE-HDBK-1114-98; Guide to Good Practices for Line and Training Manager Activities

    Office of Environmental Management (EM)

    4-98 June 1998 Superseding DOE-STD-1056-93 February 1993 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR LINE AND TRAINING MANAGER ACTIVITIES U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401.

  2. DOE G 226.1-1 Federal Line Management Oversight of Department...

    Office of Environmental Management (EM)

    O 226.1A; NA-1 SD 226.1A; DOE O 420.1B). 6. Issues identified during previous reviews (e.g. CDNS Biennial Reviews, HSS reviews, self-assessments) have been appropriately resolved,...

  3. DOE G 226.1-1 Federal Line Management Oversight of Department...

    Office of Environmental Management (EM)

    O 226.1A; NA-1 SD 226.1A; DOE O 420.1B). 9. Issues identified during previous reviews (e.g. CDNS Biennial Reviews, HSS reviews, self- assessments) have been appropriately...

  4. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    for DOE nuclear facilities. This SRP, Safety Basis Program Review, contains five volumes to help strengthen the technical rigor of line management oversight and federal...

  5. DOE G 226.1-1 Federal Line Management Oversight of Department of Energy Nuclear Facilities NNSA CRADs

    Office of Environmental Management (EM)

    CONTRACTOR TRAINING AND QUALIFICATION (T&Q) OBJECTIVE T&Q.1: The Site Office has oversight processes and procedures in place and has ensured that an effective and fully compliant Training and Qualification (T&Q) safety management program (SMP) has been implemented in support of site nuclear activities. CRITERIA 1. The Site Office has developed and implemented processes and procedures to effectively oversee contractor performance in this functional area (DOE O 226.1A; DOE O 426.2;

  6. DOE G 226.1-1 Federal Line Management Oversight of Department of Energy Nuclear Facilities NNSA CRADs

    Office of Environmental Management (EM)

    CONDUCT OF OPERATIONS (OP) OBJECTIVE OP.1: The Site Office has oversight processes and procedures in place and has ensured that an effective and fully compliant conduct of operations (COO) safety management program (SMP) has been implemented at the site. CRITERIA 1. The Site Office has developed and implemented processes and procedures to effectively oversee contractor performance in this functional area (DOE O 226.1A; NA-1 SD 226.1A). 2. For each nuclear facility, the Site Contractor has

  7. DOE G 226.1-1 Federal Line Management Oversight of Department of Energy Nuclear Facilities NNSA CRADs

    Office of Environmental Management (EM)

    QUALITY ASSURANCE (QA) OBJECTIVE QA.1: NNSA Site Office has implemented a quality assurance program (QAP) that complies with DOE nuclear safety requirements and the Site Office oversight processes and procedures have ensured that an effective quality assurance program has been implemented by the Site Contractor. NOTE: Some attributes of this CRAD are evaluated in other functional areas such as training, conduct of operations, and integrated safety management. References will be made to other

  8. DOE Sustainability Reporting Open Line Help Call

    Broader source: Energy.gov [DOE]

    The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

  9. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities.

  10. DOE Sustainability Reporting Open Line Help Call

    Broader source: Energy.gov [DOE]

    The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the SPO will be available on the call to answer specific questions with respect to Site Sustainability Plans (SSP) and the Consolidated Energy Data Report (CEDR).

  11. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-14

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities. Supersedes DOE G 226.1-2

  12. Federal Line Management Oversight of Department of Energy Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CURRENT DOE G 226.1-2A, Federal Line Management Oversight of Department of Energy Nuclear Facilities by David Weitzman Functional areas: Safety, Oversight The Guide was developed...

  13. Federal Line Management Oversight of Department of Energy Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, dated April 25, 2011, as applied to Federal line management of ...

  14. DOE Competency Management Program

    Broader source: Energy.gov [DOE]

    The DOE faces a talent challenge derived from a number of factors including a dynamic operating environment, an anticipated wave of retirements from the workforce, and a projected shortage of...

  15. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The purpose of this Guide is to provide U.S. Department of Energy (DOE) line management with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, date April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities.

  16. Active DOE Technical Standards Managers

    Office of Environmental Management (EM)

    TECHNICAL STANDARDS PROGRAM ASSIGNMENT TELEPHONE/FAX/EMAIL NAME DOE FACILITY/ADDRESS LOC CODE AU-30 Je D. Feit DOE Technical Standards Program, Manager U.S. Department of Energy 19901 Germantown Road Germantown, MD 20876 Phone: (301) 903-0471 Fax: (301) 903-6172 Je rey.Feit@hq.doe.gov AU-30 Kathy A. Knight DOE Technical Standards Program, Program Specialist U.S. Department of Energy 19901 Germantown Road Germantown, MD 20876 Phone: (301) 903-4439 Fax: (301) 903-6172 kathy.knight@hq.doe.gov AU-30

  17. DOE Jobs Online (Hiring Manager), Office of Human Capitol Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and Solutions DOE Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and...

  18. Line Management Perspective: Office of Environmental Management (EM) |

    Energy Savers [EERE]

    Department of Energy Line Management Perspective: Office of Environmental Management (EM) Line Management Perspective: Office of Environmental Management (EM) Addthis Description Slide Presentation by Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management. EFCOG Integrated Safety Management Work Planning and Control. Biography: Matthew Moury View All Videos

  19. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    5 iii Acronyms DOE U.S. Department of Energy DSA Documented Safety Analysis HA Hazard Analysis LOI Line of Inquiry SAC Specific Administrative Control SRP Standard...

  20. DOE Jobs Online (Hiring Manager), Office of Human Capitol Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation and Solutions | Department of Energy Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and Solutions DOE Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and Solutions DOE Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and Solutions PDF icon DOE Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and Solutions More Documents & Publications PIA - GovTrip (DOE data) PIA -

  1. DOE Office of Environmental Management Project and Contract Management

    Energy Savers [EERE]

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. PDF icon DOE Office of Environmental Management Contract and Project

  2. DOE Challenge Home Recommended Quality Management Provisions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Recommended Quality Management Provisions. PDF icon qm6-14-13.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National ...

  3. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Management JCO Justification for Continued Operation LOI Line of Inquiry PAAA Price Anderson Amendments Act PDSA Preliminary Documented Safety Analysis PHA Preliminary Hazards...

  4. DOE - Office of Legacy Management -- Ashtabula

    Office of Legacy Management (LM)

    for maintaining records for the Ashtabula site was transferred to DOE's Office of Legacy Management in 2010. The site requires records management and stakeholder support. For...

  5. DOE - Office of Legacy Management -- CEER

    Office of Legacy Management (LM)

    for maintaining records for the CEER site transferred to DOE's Office of Legacy Management in 2006. The site requires records management and stakeholder support. For...

  6. DOE - Office of Legacy Management -- Bonus

    Office of Legacy Management (LM)

    of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Boiling Nuclear Superheater (BONUS) Decommissioned Reactor Site...

  7. Integrated Safety Management Policy - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P 450.4A, Integrated Safety Management Policy by David Weitzman Functional areas: Integrated Safety Management, Safety The policy establishes DOE's expectation for safety,...

  8. DOE Financial Assistance Awards: Active Project Management |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Assistance Awards: Active Project Management DOE Financial Assistance Awards: Active Project Management Presentation by Jim Alkire during the May 15 working lunch session ...

  9. Configuration Management Program - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    73-2003, Configuration Management Program by Diane Johnson The purpose of this standard is to define the objectives of a configuration management process for DOE nuclear facilities...

  10. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Face-to-Face Calendar NTS Public Tours Factsheets Speakers Bureau To Your Health Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office August/September 2007 - Issue 127 A publication for all members of the NNSA/NSO family New Test Site is

  11. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  12. DOE Facility Management Contracts | Department of Energy

    Energy Savers [EERE]

    Facility Management Contracts DOE Facility Management Contracts PDF icon DOE site facility mgt contracts Internet Posting 10-11-11.pdf More Documents & Publications DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE site facility mgt contracts Internet Posting 5-2-11.xlsx DOEfacilitymgt_contractsownership_01052011.pdf

  13. DOE Awards Management and Operating Contract for DOE's Strategic

    Office of Environmental Management (EM)

    Petroleum Reserve | Department of Energy Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18, 2013 - 5:11pm Addthis WASHINGON, D. C. - After conducting a rigorous competitive selection process, the U.S. Department of Energy (DOE) today announced that Fluor Federal Petroleum Operations, LLC (team includes members comprised of Parent Company Fluor Federal Services, Inc., of

  14. DOE Awards Management and Operating Contract for DOE's Waste Isolation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pilot Plant | Department of Energy Management and Operating Contract for DOE's Waste Isolation Pilot Plant DOE Awards Management and Operating Contract for DOE's Waste Isolation Pilot Plant April 20, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Environmental Management Consolidated Business Center (803) 952-8564 Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) announced today that Nuclear Waste Partnership LLC (members comprised

  15. DOE Site Facility Management Contracts Internet Posting | Department...

    Energy Savers [EERE]

    DOE Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November...

  16. DOE Human Resources Management Division - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs DOE Human Resources Management Division DOE Employment Recognition and Awards Program Federal Employees Union (AFGE Local 788) Work Schedules / Pay and Leave Benefits and Services EEO & Diversity Contact Us DOE Human Resources Management Division Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Richland Operations Office / Office of River Protection The Human Resources

  17. DOE Forms Management FAQ's | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Forms » DOE Forms Management FAQ's DOE Forms Management FAQ's Facts.jpg What types of forms are there? Departmental Form: for use department-wide by DOE personnel only Headquarters (HQ) Form: developed or managed by a DOE Headquarters organization and generally for use by HQ or within an HQ element Local Form: for use within a specific DOE Field Office Optional Form: developed by a Federal agency for use by two or more agencies, or non-mandatory Government-wide use and approved by

  18. 2015 DOE Acquisition and Project Management Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Break Acquisition and Project Management Awards Presentations Welcome & Workshop Logistics Welcome & Workshop Logistics No Host Reception at Hotel 2015 DOE Acquisition and...

  19. Position Management and Classification - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CURRENT DOE O 325.2 Chg 1 (AdminChg), Position Management and Classification by Bruce Murray Functional areas: Administrative Change, Position Classification, Federal Wage System...

  20. Negotiating equity for management of DOE wastes

    SciTech Connect (OSTI)

    Carnes, S.A.

    1994-09-01

    One important factor frustrating optimal management of Department of Energy (DOE)-complex wastes is the inability to use licensed and permitted facilities systematically. Achieving the goal of optimal use of DOE`s waste management facilities is politically problematic for two reasons. First, no locale wants to bear a disproportionate burden from DOE wastes. Second, the burden imposed by additional wastes transported from one site to another is difficult to characterize. To develop a viable framework for equitably distributing these burdens while achieving efficient use of all DOE waste management facilities, several implementation and equity issues must be addressed and resolved. This paper discusses stakeholder and equity issues and proposes a framework for joint research and action that could facilitate equity negotiations among stakeholder and move toward a more optimal use of DOE`s waste management capabilities.

  1. DOE Names Oak Ridge Cleanup Manager

    Broader source: Energy.gov [DOE]

    Oak Ridge, Tenn. – The U.S. Department of Energy (DOE) announced today the selection of Sue Cange as the manager of the Oak Ridge Office of Environmental Management (EM). Previously, Cange served as the acting manager of EM’s Oak Ridge Office since May 2014, and she has served as the deputy manager since March 2011.

  2. DOE Sustainability Reporting Open Line Help Call | Department...

    Broader source: Energy.gov (indexed) [DOE]

    November 18, 2015 2:00PM to 3:00PM EST The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual...

  3. DOE Sustainability Reporting Open Line Help Call | Department...

    Broader source: Energy.gov (indexed) [DOE]

    November 4, 2015 2:00PM to 3:00PM EST The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual...

  4. DOE Sustainability Reporting Open Line Help Call | Department...

    Broader source: Energy.gov (indexed) [DOE]

    October 28, 2015 2:00PM to 3:00PM EDT The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual...

  5. DOE Manual - Advisory Committee Management Program

    Office of Environmental Management (EM)

    MANUAL DOE M 515.1-1 Approved: 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM U.S. DEPARTMENT OF ENERGY Office of Management AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Management i DOE M 515.1-1 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM 1. PURPOSE. This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee

  6. "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY FAMILIAR LEVEL "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED...

  7. DOE - Office of Legacy Management -- Hallam

    Office of Legacy Management (LM)

    Nebraska Hallam, Nebraska, Decommissioned Reactor Site A D&D Program Site hallam_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Hallam Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine

  8. DOE - Office of Legacy Management -- Piqua

    Office of Legacy Management (LM)

    Ohio Piqua, Ohio, Decommissioned Reactor Site A D&D Program Site piqua_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Piqua Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and

  9. DOE - Office of Legacy Management -- GJO

    Office of Legacy Management (LM)

    Junction Colorado, Site A D&D Program Site gjo_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Grand Junction Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities,

  10. DOE Seeking Information on Transmission Line Permitting | Department of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are

  11. DOE SES PERFORMANCE MANAGEMENT | Department of Energy

    Office of Environmental Management (EM)

    DOE SES PERFORMANCE MANAGEMENT DOE SES PERFORMANCE MANAGEMENT This covers Department of Energy SES executives, as well as those Presidential appointees who have retained eligibility for SES performance appraisals and awards under 5 U.S.C. 3392(c). Documents Available for Download November 10, 2015 FY 2016 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP) PERFORMANCE APPRAISAL OPENING GUIDANCE FY 2016 performance appraisal cycle for both SES and SP members, which includes Senior Level

  12. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  13. DOE Oak Ridge Operations managers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oak Ridge Operations managers As the last few articles have shown, the period immediately following the end of World War II was one of constant and continuing change for Oak Ridge. The contractor changes settled down after all three sites came under Carbide and Carbon Chemicals Company. The Atomic Energy Commission, although headquartered in Washington, DC, continued to manage much of the atomic energy activities through the Oak Ridge office. By the early 1950's five important area offices were

  14. Emergency Management Lines of Inquiry, April 2008

    Broader source: Energy.gov (indexed) [DOE]

    23, 2008 EMERGENCY MANAGEMENT Inspection Criteria, Activities, and Lines of Inquiry Functional Area: Hazards Survey (HS) and Emergency Planning Hazards Assessment (EPHA) Inspection Criteria: Emergency planning includes the identification of hazards and threats. A hazards survey is the qualitative portion of the hazards identification process. It briefly describes the potential impacts of emergency events or conditions and summarizes the planning and preparedness requirements that apply. If

  15. DOE Site Facility Management Contracts Internet Posting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November 2015.pdf More Documents & Publications DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE site facility mgt contracts Internet Posting 5-2-11.xlsx DOE Facility Management Contracts

  16. DOE Challenge Home Recommended Quality Management Provisions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommended Quality Management Provisions RECOMMENDED QUALITY MANAGEMENT PROVISIONS QM Provision Builder Documentation & Verification Requirements Rater/Verifier Requirements QM #1: Project Documentation Complete construction documents shall be qualified as Designed to Earn ENERGY STAR and document all additional provisions and specifications required for DOE Challenge Home including mandatory provisions: 2012 IECC envelope insulation levels, ENERGY STAR windows, duct work in conditioned

  17. DOE - Office of Legacy Management -- Geothermal

    Office of Legacy Management (LM)

    Geothermal Test Facility, California A Oakland Operations Office site geothermal_map The Geothermal Test Facility site was a research laboratory formerly operated under the DOE Oakland Operations Office, California. After remediation, the site transferred to the Office of Legacy Management in 2005. The site requires records management and stakeholder support. For more information about the Geothermal Test

  18. DOE - Office of Legacy Management

    Office of Legacy Management (LM)

    Weldon Spring Site Five-Year Review Survey Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) requires that remedial actions, which result in any hazardous substances, pollutants, or contaminants remaining at a site be subject to a five-year review. The U.S. Department of Energy (DOE) is currently conducting its fourth five-year review at the Weldon Spring, Missouri,

  19. ORAU Wins DOE Facility Management Contractor Small Business Achievemen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year September ...

  20. 2015 DOE Acquisition and Project Management Workshop Agenda ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Acquisition and Project Management Workshop Agenda 2015 DOE Acquisition and Project Management Workshop Agenda This year's theme is "Federal Stewardship-- Providing the Value...

  1. DRAFT 2012 DOE Project Management Workshop Agenda | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT 2012 DOE Project Management Workshop Agenda DRAFT 2012 DOE Project Management Workshop Agenda PDF icon 2012 Workshop AgendaVer25 (For Distribution).pdf More Documents &...

  2. 2014 DOE Project Management Workshop Attendees List | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Project Management Workshop Attendees List 2014 DOE Project Management Workshop Attendees List PDF icon 2014 PM Workshop Attendees ListName & Office.pdf More Documents &...

  3. DOE - Office of Legacy Management -- Falls

    Office of Legacy Management (LM)

    Texas Falls City, Texas, Disposal Site UMTRCA Title I site falls_map The Falls City Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Falls City site, view the fact

  4. DOE - Office of Legacy Management -- Lowman

    Office of Legacy Management (LM)

    Idaho Lowman, Idaho, Disposal Site UMTRCA Title I site lowman_map The Lowman disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Lowman site, view the fact sheet. Site

  5. DOE - Office of Legacy Management -- AMB

    Office of Legacy Management (LM)

    New Mexico Ambrosia Lake, New Mexico, Disposal Site UMTRCA Title I site ambr_map The Ambrosia Lake Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Ambrosia Lake site, view the fact

  6. DOE - Office of Legacy Management -- Burrell

    Office of Legacy Management (LM)

    Pennsylvania Burrell, Pennsylvania, Disposal Site UMTRCA Title I site bur_map The Burrell Disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Burrell site, view the fact

  7. DOE - Office of Legacy Management -- Canon

    Office of Legacy Management (LM)

    Pennsylvania Canonsburg, Pennsylvania, Disposal Site UMTRCA Title I site can_map The Canonsburg disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Canonsburg site, view

  8. DOE - Office of Legacy Management -- Maybell

    Office of Legacy Management (LM)

    Maybell, Colorado, Disposal Site UMTRCA Title I site maybell_map The Maybell Disposal Site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Maybell site, view the fact sheet. Site

  9. DOE - Office of Legacy Management -- Riverton

    Office of Legacy Management (LM)

    Wyoming Riverton, Wyoming, Processing Site An UMTRCA Title I site riverton_map The Riverton Processing Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Riverton site, view the fact sheet.

  10. DOE - Office of Legacy Management -- Ship

    Office of Legacy Management (LM)

    New Mexico Shiprock, New Mexico, Disposal Site UMTRCA Title I site shiprock_map The Shiprock Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Shiprock site, view the

  11. DOE - Office of Legacy Management -- Spook

    Office of Legacy Management (LM)

    Wyoming Spook, Wyoming, Disposal Site UMTRCA Title I site spook_map The Spook disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Spook site, view the fact sheet. Site

  12. DOE - Office of Legacy Management -- Tuba

    Office of Legacy Management (LM)

    Arizona Tuba City, Arizona, Disposal Site UMTRCA Title I site tuba_map The Tuba City Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Tuba City site, view the fact

  13. DOE - Office of Legacy Management -- GJD

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site gjd_map The Grand Junction disposal site is a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site. Responsibility for custody and long-term management of the site transferred to DOE's Office of Legacy Management in 2003. Management responsibilities include routine inspection and maintenance of the disposal site, records-related activities, and stakeholder support. For more information about the Grand Junction disposal site, view the fact sheet.

  14. DOE - Office of Legacy Management -- GJP

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site gjp_map The Grand Junction processing site is a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site. Responsibility for management and long-term custody of the site's contaminated groundwater transferred to DOE's Office of Legacy Management in 2003. Management requirements include routine inspection and maintenance of groundwater monitoring wells, records-related activities, and stakeholder support. For more information about the Grand Junction

  15. DOE - Office of Legacy Management

    Office of Legacy Management (LM)

    Mound Site 2016 CERCLA Five-Year Review Survey Community involvement is an integral part of the Mound Site and the CERCLA Five-Year Review process. DOE welcomes your input and comments about the Mound Site in the survey. You may answer as many or as few questions as you feel comfortable answering. Responses will be accepted through April 30, 2016. Affiliation with the Mound site. Are you affiliated with the site or any site-related group (e.g., former worker, neighbor, former citizen group

  16. Analysis of DOE international environmental management activities

    SciTech Connect (OSTI)

    Ragaini, R.C.

    1995-09-01

    The Department of Energy`s (DOE) Strategic Plan (April 1994) states that DOE`s long-term vision includes world leadership in environmental restoration and waste management activities. The activities of the DOE Office of Environmental Management (EM) can play a key role in DOE`s goals of maintaining U.S. global competitiveness and ensuring the continuation of a world class science and technology community. DOE`s interest in attaining these goals stems partly from its participation in organizations like the Trade Policy Coordinating Committee (TPCC), with its National Environmental Export Promotion Strategy, which seeks to strengthen U.S. competitiveness and the building of public-private partnerships as part of U.S. industrial policy. The International Interactions Field Office task will build a communication network which will facilitate the efficient and effective communication between DOE Headquarters, Field Offices, and contractors. Under this network, Headquarters will provide the Field Offices with information on the Administration`s policies and activities (such as the DOE Strategic Plan), interagency activities, as well as relevant information from other field offices. Lawrence Livermore National Laboratory (LLNL) will, in turn, provide Headquarters with information on various international activities which, when appropriate, will be included in reports to groups like the TPCC and the EM Focus Areas. This task provides for the collection, review, and analysis of information on the more significant international environmental restoration and waste management initiatives and activities which have been used or are being considered at LLNL. Information gathering will focus on efforts and accomplishments in meeting the challenges of providing timely and cost effective cleanup of its environmentally damaged sites and facilities, especially through international technical exchanges and/or the implementation of foreign-development technologies.

  17. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  18. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  19. DOE Challenge Home Recommended Quality Management Provisions | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Recommended Quality Management Provisions DOE Challenge Home Recommended Quality Management Provisions DOE Challenge Home Recommended Quality Management Provisions. PDF icon qm_6-14-13.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) Washington DOE ZERH Program Requirements DOE Challenge Home, California

  20. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    Open Energy Info (EERE)

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program) Jump to: navigation, search Logo: Federal Energy Management Program (FEMP) Name...

  1. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    Open Energy Info (EERE)

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program (FEMP)) Jump to: navigation, search Logo: Federal Energy Management Program...

  2. DOE - Office of Legacy Management -- MURR

    Office of Legacy Management (LM)

    Missouri Missouri University Research Reactor (MURR), Missouri, Site An Oakland Operations Office site murr_map The Missouri University Research Reactor (MURR) site was a research laboratory formerly operated under the DOE Oakland Operations Office, California. After remediation, the site transferred to the Office of Legacy Management in 2005. The site requires records management and stakeholder support. For more information about the MURR site, view the fact sheet. Site Documents and Links

  3. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Calendar NTS Public Tours Factsheets Speakers Bureau Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office December 2007/January 2008 - Issue 129 A publication for all members of the NNSA/NSO family SiteLines looks back at 2007 2007 was a busy and productive year

  4. DOE-ORP Contract Management Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of River Protection Contracts & Procurements DOE-ORP Contract Management Plans Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers Contact ORP DOE-ORP Contract Management Plans Email Email Page | Print Print Page |Text Increase Font Size

  5. DOE - Office of Legacy Management -- Chariot

    Office of Legacy Management (LM)

    Alaska Chariot, Alaska, Site A Nevada Offsite chariotmap The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Chariot Site in 2008. The Chariot site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Chariot site, view the fact sheet. Site Documents and Links Contact Us

  6. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Briefs NTS Public Tours Factsheets Speakers Bureau To Your Health Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library> SiteLines U.S. DOE/NNSA - Nevada Site Office May/June 2008 - Issue 131 A publication for all members of the NNSA/NSO family Criticality Experiments Facility Construction Passes Halfway

  7. 2016 DOE Project Management Workshop | Department of Energy

    Energy Savers [EERE]

    Services » Project Management » 2016 DOE Project Management Workshop 2016 DOE Project Management Workshop 2016 DOE Project Management Workshop Workshop Details: What: 2016 DOE Project Management Workshop When: March 22-23, 2016. In addition, a select few will remain a third day for the Project Controls Workshop (March 24) to discuss ongoing initiatives to improve integration of project controls and earned value with project management. Where: Sheraton Pentagon City Hotel, 900 South Orme

  8. How Environmental Management Does Business | Department of Energy

    Office of Environmental Management (EM)

    Environmental Management Does Business How Environmental Management Does Business Topic: Jack Surash CBC, Provided an Overview of how EM does Contracting with its Subcontractors. PDF icon EM Business - January 28, 2015 More Documents & Publications Update on Procurement Opportunities and Acquisition Process EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management Meeting the Challenge: Integrating Acquisition and

  9. 2016 DOE Project Management Workshop - Biographies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biographies 2016 DOE Project Management Workshop - Biographies Biographies for this year's workshop are not yet available. Please check back later. PDF icon Biographies More Documents & Publications 2016 DOE Project Management Workshop - Presentations 2016 DOE Project Management Workshop - Agenda 2014 DEPARTMENT OF ENERGY PROJECT MANAGEMENT WORKSHOP

  10. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    project receives DOE Secretary's Award for Project Management Improvement | National ... Blog Home NNSA Blog NNSA project receives DOE Secretary's Award for ... NNSA project ...

  11. DOE Interim Guidance on Mercury Management Procedures and Standards |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Services » Waste Management » Waste Disposition » Long-Term Management and Storage of Elemental Mercury is in the Planning Stages » DOE Interim Guidance on Mercury Management Procedures and Standards DOE Interim Guidance on Mercury Management Procedures and Standards DOE, in consultation with the USEPA and State agencies, prepared this guidance on packaging, transportation, receipt, management, and long-term storage of elemental mercury at a DOE facility or

  12. DOE technology information management system database study report

    SciTech Connect (OSTI)

    Widing, M.A.; Blodgett, D.W.; Braun, M.D.; Jusko, M.J.; Keisler, J.M.; Love, R.J.; Robinson, G.L.

    1994-11-01

    To support the missions of the US Department of Energy (DOE) Special Technologies Program, Argonne National Laboratory is defining the requirements for an automated software system that will search electronic databases on technology. This report examines the work done and results to date. Argonne studied existing commercial and government sources of technology databases in five general areas: on-line services, patent database sources, government sources, aerospace technology sources, and general technology sources. First, it conducted a preliminary investigation of these sources to obtain information on the content, cost, frequency of updates, and other aspects of their databases. The Laboratory then performed detailed examinations of at least one source in each area. On this basis, Argonne recommended which databases should be incorporated in DOE`s Technology Information Management System.

  13. DOE - Office of Legacy Management -- Salmon2

    Office of Legacy Management (LM)

    Mississippi Salmon, Mississippi, Site A Nevada Offsite salmon_map The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Salmon Site in 2008. Responsibilities include long-term surveillance and maintenance of the subsurface where residue remains from the nuclear detonation tests conducted during the Cold War-era, maintaining institutional controls, archiving records, and responding to stakeholder inquiries. For more information about the

  14. DOE - Office of Legacy Management -- Amchitka

    Office of Legacy Management (LM)

    Alaska Amchitka, Alaska, Site A Nevada Offsite amchitkamap2.jpg The DOE Office of Legacy Management assumed responsibility for all activities associated with subsurface completion and long-term surveillance and maintenance at the Amchitka site in 2008. The Amchitka site requires records-related activities, stakeholder support, and an inspection and maintenance trip every 5 years. For more information about the Amchitka site, view the fact sheet. Site Documents and Links Contact Us Amchitka

  15. DOE - Office of Legacy Management -- Central

    Office of Legacy Management (LM)

    Nevada Central Nevada Test Area (CNTA), Nevada, Site A Nevada Offsite centralmap The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Central Nevada Test Area (CNTA) Site in 2008. The CNTA site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the CNTA site, view the fact sheet. Site Documents and Links Contact Us Central Nevada Test Area (CNTA) Site Mapping and

  16. DOE - Office of Legacy Management -- Gasbuggy

    Office of Legacy Management (LM)

    New Mexico Gasbuggy, New Mexico, Site A Nevada Offsite gasbuggy_map The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Gasbuggy Site in 2008. The Gasbuggy site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Gasbuggy site, view the fact sheet. Site Documents and Links Contact Us Gasbuggy Site Mapping and Monitoring (GEMS) Last Updated: 2/2

  17. DOE - Office of Legacy Management -- Gnome

    Office of Legacy Management (LM)

    New Mexico Gnome-Coach, New Mexico, Site A Nevada Offsite gnomemap The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Gnome-Coach Site in 2008. The Gnome-Coach site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Gnome-Coach site, view the fact sheet. Site Documents and Links Contact Us Gnome-Coach Site Mapping and Monitoring (GEMS)

  18. DOE - Office of Legacy Management -- Rio

    Office of Legacy Management (LM)

    Colorado Rio Blanco, Colorado, Site A Nevada Offsite rioblanco_map The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Rio Blanco site in 2008. The Rio Blanco site requires monitoring of nearby natural gas wells, groundwater wells, and surface water locations; routine inspection and maintenance; records-related activities; and stakeholder support. For more information about the Rio Blanco site, view the fact sheet. Site Documents and Links

  19. DOE - Office of Legacy Management -- Rulison

    Office of Legacy Management (LM)

    Rulison, Colorado, Site A Nevada Offsite rulison_map The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Rulison site in 2008. The Rulison site requires monitoring of nearby natural gas wells, groundwater wells, and surface water locations; routine inspection and maintenance; records-related activities; and stakeholder support. For more information about the Rulison site, view the fact sheet. Site Documents and Links Contact Us Rulison

  20. DOE - Office of Legacy Management -- Shoal

    Office of Legacy Management (LM)

    Nevada Shoal, Nevada, Site A Nevada Offsite shoalmap The DOE Office of Legacy Management assumed responsibility for long-term surveillance and maintenance at the Shoal Site in 2008. The Shoal site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Shoal site, view the fact sheet. Site Documents and Links Contact Us Shoal Site Mapping and Monitoring (GEMS) Last Updated: 2/22/2016

  1. DOE - NNSA/NSO -- SiteLines - Issue 144

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office July/August 2010 - Issue 144 A publication for all members of the NNSA/NSO family RNCTEC One Year Later: Mission Growth and Expansion It was one year ago that the National Nuclear Security Administration/ Nevada Site Office (NNSA/NSO) completed the start-up of the Radiological/Nuclear Countermeasures Test and Evaluation Complex (RNCTEC)

  2. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Face to Face Calendar NTS Public Tours Factsheets Speakers Bureau Acronyms Mailing List Information Request Publishing Information Questions/Contact Credits Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office April/May 2007 - Issue 125 A publication for all members of the NNSA/NSO family Small Thermos experiments yield great data on aging stockpile The

  3. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beyond the Call Face-to-Face Calendar NTS Public Tours Factsheets Speakers Bureau To Your Health Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office October/November 2007 - Issue 128 A publication for all members of the NNSA/NSO family CEF conducts three primary

  4. DOE - NNSA/NSO -- SiteLines Web Edition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Face-to-Face NTS Public Tours Factsheets Speakers Bureau Acronyms Mailing List Information Request Publishing Information Questions/Contact Masthead Archives FAQs/QUESTIONS SUBJECT INDEX SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office March/April 2008 - Issue 130 A publication for all members of the NNSA/NSO family New addition to NSO Teri Holland has joined NSO as the new Assistant

  5. Line Management Understanding of QA and Oversight | Department of Energy

    Energy Savers [EERE]

    Line Management Understanding of QA and Oversight Line Management Understanding of QA and Oversight Users will provide current or on-going QA issues of concern that impact work being done correctly, timely, and safely. Input could be from recent assessments, trends, Performance Metrics, number of open action items, recurring issues, etc. PDF icon Line Management Understanding of QA and Oversight More Documents & Publications SOPP-43, EM-23 Quality Assurance Oversight Protocol for EM

  6. PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM)

    Broader source: Energy.gov [DOE]

    A briefing to the SEAB Task Force on Technology Development for Environmental Management on the DOE Ofiice of Environmental Management

  7. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    ... Note: Initiator frequency is used to define these events. Does the selection of accidents ... Note: Refer to DOE-STD-3009, Appendix A. Was the five factor formula (MAR x ARF x RF x DR ...

  8. DOE Zero Energy Ready Home Recommended Quality Management Provisions |

    Energy Savers [EERE]

    Department of Energy Recommended Quality Management Provisions DOE Zero Energy Ready Home Recommended Quality Management Provisions DOE Zero Energy Ready Home Recommended Quality Management Provisions. PDF icon QM Cheklist.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) Washington DOE ZERH Program Requirements DOE Zero Energy Ready Home Solar Hot Water-Ready Checklist

  9. Worker Protection Management for DOE Federal and Contractor Employees |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Services » Program Management » Safety » Worker Protection Management for DOE Federal and Contractor Employees Worker Protection Management for DOE Federal and Contractor Employees This Order establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Worker Protection Management for DOE Federal and

  10. 2014 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DOE Project Management Workshop 2014 DOE Project Management Workshop What: 2014 DOE Project Management Workshop (Meeting the Challenge-Integrated Acquisition & Project Management) When: Tuesday and Wednesday, March 25 & 26 2014 Where: Sheraton Pentagon City Hotel, 900 South Orme Street, Arlington, VA 22204 *Lunch is not included in this year's program. Click here for local food options. Sheraton Restaurant Menu Click here Who: DOE FPDs/Staff, Program/Staff Office Reps, Contracting

  11. 2016 DOE Project Management Workshop - Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda 2016 DOE Project Management Workshop - Agenda The workshop agenda is not available at this time. Please check back later. PDF icon Agenda More Documents & Publications 2016 DOE Project Management Workshop - Biographies 2016 DOE Project Management Workshop - Presentations EM QA Working Group September 2011 Notes

  12. 2016 DOE Project Management Workshop - Presentations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Presentations 2016 DOE Project Management Workshop - Presentations The presentations for this year's workshop are not yet available. Please check back later. PDF icon Presentations More Documents & Publications 2016 DOE Project Management Workshop - Biographies 2016 DOE Project Management Workshop - Agenda BETO Monthly News Blast, June 2013

  13. DOE - NNSA/NFO -- SiteLines Newsletter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications > OneVoice NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office OneVoice Newsletter OneVoice is used to communicate current activities and events to NNSA/NFO, contractor and laboratory employees, their families, stakeholders, retired employees, corporate management, and local, state and federal officials. The newsletter reaches more than 4,000 readers in 20 states. Instructions: Click the document title to view or download the Adobe PDF file marked with this icon ( ) [

  14. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES

    Broader source: Energy.gov [DOE]

    "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This...

  15. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  16. 2015 DOE Acquisition and Project Management (APM) Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 DOE Acquisition and Project Management (APM) Workshop 2015 DOE Acquisition and Project Management (APM) Workshop Workshop Details: What: 2015 DOE Acquisition and Project Management (APM) Workshop When: March 24, 25, 26 2015 (Tue, Wed, Thu) Where: Sheraton Pentagon City Hotel, 900 South Orme Street, Arlington, VA 22204 (Lunch will not be included in this year's program) Who: DOE FPDs/Staff, Program/Staff Office Reps, and Contracting Officers supporting APM. (This year's combined

  17. Depleted uranium: A DOE management guide

    SciTech Connect (OSTI)

    1995-10-01

    The U.S. Department of Energy (DOE) has a management challenge and financial liability in the form of 50,000 cylinders containing 555,000 metric tons of depleted uranium hexafluoride (UF{sub 6}) that are stored at the gaseous diffusion plants. The annual storage and maintenance cost is approximately $10 million. This report summarizes several studies undertaken by the DOE Office of Technology Development (OTD) to evaluate options for long-term depleted uranium management. Based on studies conducted to date, the most likely use of the depleted uranium is for shielding of spent nuclear fuel (SNF) or vitrified high-level waste (HLW) containers. The alternative to finding a use for the depleted uranium is disposal as a radioactive waste. Estimated disposal costs, utilizing existing technologies, range between $3.8 and $11.3 billion, depending on factors such as applicability of the Resource Conservation and Recovery Act (RCRA) and the location of the disposal site. The cost of recycling the depleted uranium in a concrete based shielding in SNF/HLW containers, although substantial, is comparable to or less than the cost of disposal. Consequently, the case can be made that if DOE invests in developing depleted uranium shielded containers instead of disposal, a long-term solution to the UF{sub 6} problem is attained at comparable or lower cost than disposal as a waste. Two concepts for depleted uranium storage casks were considered in these studies. The first is based on standard fabrication concepts previously developed for depleted uranium metal. The second converts the UF{sub 6} to an oxide aggregate that is used in concrete to make dry storage casks.

  18. 2014 DOE Project Management Workshop Presentations: PARS II Enhancements -

    Office of Environmental Management (EM)

    Igor Pedan, MA-63 | Department of Energy 4 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop Presentations: PARS II Enhancements - Igor Pedan, MA-63 2014 DOE Project Management Workshop presentation by Igor Pedan. PDF icon Presentation More Documents & Publications PARS IIe CUI Training Slides Agenda Are We There Yet? - Mike Peek, Director, Project Management (MA-63)

  19. 2011 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Project Management Workshop 2011 DOE Project Management Workshop Workshop Speakers and Presentations Paul Bosco, The New DOE O 413.3B Jeff Baker, EERE's Research Support Facility Patrick Ferraro, Contract Management/ Project Management Summit Outbrief Anirban Basu, Construction Economic Forecast John Curran, LED Lighting Michael Deane, Construction and Demolition Debris Recycle Mark Fallon, Leadership & Safety Cost Estimating Panel, The Science and Art of Cost Estimating Tom Fox, Leading

  20. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE Acquisition and Project Management (APM) Workshop Presentations 2015 DOE Acquisition and Project Management (APM) Workshop Presentations Time Presenter Topic Day 1 0820 Paul Bosco, Director, Office of Acquisition and Project Management Project Management Perspective 1000 Stephen Meador, Director, Office of Project Assessments, Science SC Projects Perspective 1400 David Kester, Defense Contract Management Agency EVMS - FROM DATA TO DIAGNOSIS - A DoD Perspective 1500

  1. Line Management Perspective: Office of Science (SC)

    Broader source: Energy.gov [DOE]

    Remarks by Joseph A. McBrearty concerning the importance of integrated safety management for the protection of workers, the public, and the environment and successfully implementing the Department of Energy, Office of Science's missions.

  2. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Code of Record May 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan Code of Record Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation May 2014 1 Table of...

  3. DOE methods for evaluating environmental and waste management samples.

    SciTech Connect (OSTI)

    Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

  4. DOE Order 435.1, Radioactive Waste Management

    Broader source: Energy.gov [DOE]

    The objective of this U.S. Department of Energy (DOE) Order is to ensure that all DOE radioactive waste is managed in a manner that is protective of worker and public health and safety and the environment.

  5. DOE Awards Management and Operating Contract for DOE's Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chief Spokesperson Andrew Beck Regarding Citgo's Request for Oil from the Strategic Petroleum Reserve Statement from DOE's Chief Spokesperson Andrew Beck Regarding Citgo's Request ...

  6. DOE Financial Assistance Awards: Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Source: US DOE 712013 eere.energy.gov DOE Financial Assistance Awards: Active Project ... eere.energy.gov Award Mechanisms * Financial Assistance - Principal Purpose: to ...

  7. Change Control Management Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20, Change Control Management Guide by Ruben Sanchez Functional areas: Program Management, Project Management The Guide provides a suggested approach and uniform guidance for...

  8. Guide to good practices for line and training manager activities

    SciTech Connect (OSTI)

    1998-06-01

    The purpose of this guide is to provide direction for line and training managers in carrying out their responsibilities for training and qualifying personnel and to verify that existing training activities are effective.

  9. DOE Names New Richland Operations Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Names New Richland Operations Manager DOE Names New Richland Operations Manager December 1, 2014 - 12:00pm Addthis The U.S. Department of Energy (DOE) announced today the selection of Stacy Charboneau as the Manager of the Richland Operations Office (DOE-RL) at the Hanford Site in southwest Washington State. In this role, she will continue cleanup momentum along the Columbia River, help shrink the Department's active cleanup footprint, and continue safe groundwater remediation and hazardous

  10. Independent Oversight Assessment, DOE Office of Environmental Management

    Energy Savers [EERE]

    Headquarters - November 2012 | Department of Energy DOE Office of Environmental Management Headquarters - November 2012 Independent Oversight Assessment, DOE Office of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters This report provides the results of an independent assessment of the safety culture at the Department of Energy's (DOE) Office of Environmental

  11. ORAU Wins DOE Facility Management Contractor Small Business Achievement of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Year | Department of Energy ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year September 24, 2014 - 2:48pm Addthis Kevin Knobloch, DOE Chief of Staff (l) and John Hale III, OSDBU Director (r) present the Facility Management Contractor Small Business Achievement of the Year Award for FY 2013 to Heidi Timmerman, director of Procurement and Contracts Administration and

  12. DOE Fellows Join Waste Management Conference | Department of Energy

    Office of Environmental Management (EM)

    Fellows Join Waste Management Conference DOE Fellows Join Waste Management Conference March 31, 2014 - 12:00pm Addthis DOE Fellows gather with EM Lead Foreign Affairs Specialist Ana Han, front row, left to right, EM Acting Assistant Secretary David Huizenga, and Florida International University Applied Research Director Dr. Leonel E. Lagos at the Waste Management 2014 Conference. DOE Fellows gather with EM Lead Foreign Affairs Specialist Ana Han, front row, left to right, EM Acting Assistant

  13. DOE Acquisition and Project Management (APM) Glossary of Terms Handbook

    Office of Environmental Management (EM)

    FINAL VERSION 9-30-2014 | Department of Energy DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 This handbook provides definitions of acquisition and project management terms commonly used in DOE projects to ensure consistent use of terms in DOE project documents and discussions. PDF icon DOE APM Glossary of Terms Handbook_FINAL_Sep_30_2014.pdf More

  14. DOE-Energy 101: Energy Management Monthly Training | Open Energy...

    Open Energy Info (EERE)

    DOE-Energy 101: Energy Management Monthly Training (Redirected from Energy 101 Training) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy 101 Training Agency...

  15. DOE Zero Energy Ready Home Recommended Quality Management Provisions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Provisions. PDF icon QM Cheklist.pdf More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03)...

  16. DOE OFFICE OF ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... are working together efficiently to provide critical support to EM's mission." -Ralph Holland, Director, DOE Office of Environmental Management Consolidated Business Center ENERGY ...

  17. DOE - Office of Legacy Management -- Bonus_Framework

    Office of Legacy Management (LM)

    and Decommissioning (D&D) Program and Nevada Offsites Project, the Office of Legacy Management ensures compliance with DOE Order 5400.1, "General Environmental Protection...

  18. DOE National Analytical Management Program Draws Global Interest

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – The National Analytical Management Program (NAMP), which coordinates analytical services and capabilities throughout DOE, has garnered global interest.

  19. On-Line User Survey Form to provide feedback for the DOE Occupational

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiation Exposure Report | Department of Energy User Survey Form to provide feedback for the DOE Occupational Radiation Exposure Report On-Line User Survey Form to provide feedback for the DOE Occupational Radiation Exposure Report May 30, 2014 Radiation Exposure Monitoring System (REMS) User Feedback Survey. PDF icon On-Line User Survey Form to provide feedback for the DOE Occupational Radiation Exposure Report More Documents & Publications Annual DOE Occupational Radiation Exposure |

  20. DOE's New Checklist Helps Plants Assess Energy Management Activities

    Broader source: Energy.gov [DOE]

    DOE developed the Strategic Energy Management Checklist to help manufacturing facilities conduct a high-level assessment of their energy management practices and identify opportunities to achieve greater energy savings.

  1. DOE Announces Winners of 2010 Federal Energy and Water Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2010 Federal Energy and Water Management Awards DOE Announces Winners of 2010 Federal Energy and Water Management Awards October 7, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. ...

  2. DOE Order Self Study Modules - DOE O 435.1 Radioactive Waste Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35.1 RADIOACTIVE WASTE MANAGEMENT ALBUQUERQUE OPERATIONS OFFICE Change No: 0 DOE O 435.1 Level: Familiar Date: 6/15/01 1 DOE O 435.1 RADIOACTIVE WASTE MANAGEMENT FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to 1. Discuss the purpose and scope of DOE O 435.1, Radioactive Waste Management. Note: If you think that you can complete the practice at the end of

  3. DOE Order Self Study Modules - DOE O 151.1C Comprehensive Emergency Management System

    Office of Environmental Management (EM)

    O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION SERVICE CENTER Change No: 3 DOE O 151.1C Level: Familiar Date: 12/1/08 1 DOE O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. List the objectives of DOE O 151.1C, Comprehensive Emergency Management System

  4. Presentations from the 2012 DOE Project Management Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Presentations from the 2012 DOE Project Management Workshop Presentations from the 2012 DOE Project Management Workshop Please see below for copies of the presentations given at the the 2012 Department of Energy Project Management Workshop on April 3 & 4, 2012. Permission to post has not been recceived for some presentations -- these are marked, "NOT AVAILABLE." File 03.0855 Paul Bosco -- Project Management Success_0.pptx Plain text icon 03.0945 Tim Mitchell -- NOT

  5. 2016 DOE Project Management Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 DOE Project Management Workshop 2016 DOE Project Management Workshop The Department of Energy Office of Project Management Oversight and Assessments (PM) is pleased to announce the 2016 Project Management Workshop. The workshop will continue the tradition of providing opportunities to discuss projects and project challenges with senior leadership, share lessons learned, and recognize excellence. The final day of this year's workshop will focus on project controls. As a designated training

  6. NEW- DOE O 325.2, Position Management and Classification - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEW- DOE O 325.2, Position Management and Classification by Website Administrator The order establishes departmental requirements and responsibilities for classifying positions...

  7. DOE-STD-1055-93; DOE Standard Guideline to Good Practices For Maintenance Management Involvement at DOE Nuclear Facilities

    Office of Environmental Management (EM)

    NOT MEASUREMENT SENSITIVE SENSITIVE DOE-STD-1055-93 March 1993 DOE STANDARD GUIDELINE TO GOOD PRACTICES FOR MAINTENANCE MANAGEMENT INVOLVEMENT AT DOE NUCLEAR FACILITIES U.S. Department of Energy AREA MNTY Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge,

  8. Information Technology Project Management - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE G 200.1-1 App A, Appendix A Glossary on Dec 03, 2012 DOE G 200.1-1 Ch 4, Requirements Definition Stage on Dec 03, 2012 DOE G 200.1-1 App B, List of Abbreviations on Dec 03,...

  9. Invitation to the 2012 DOE Project Management Workshop | Department of

    Office of Environmental Management (EM)

    Energy Invitation to the 2012 DOE Project Management Workshop Invitation to the 2012 DOE Project Management Workshop PDF icon Kolb Signed.pdf More Documents & Publications FY2012 Excess Elimination Report United States and France Sign Joint Statement on Civil Liability for Nuclear Damage MA-2009-000093Signed.pdf

  10. Information Technology Project Management - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5.1 Admin Chg 1, Information Technology Project Management by Denise Hill Functional areas: Administrative Change, Information Technology, Project Management, The Order provides...

  11. Position Management and Classification - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O 325.2, Position Management and Classification by Bruce Murray Functional areas: Position Classification, Federal Wage System Standards, Position Management and Classification The...

  12. DOE, Invensys Operations Management to Develop, Deploy Operator Training

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Supercritical Coal Power Plants | Department of Energy DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants December 10, 2012 - 12:00pm Addthis Washington, DC - A new U.S. Department of Energy (DOE) cooperative research and development agreement to develop, test, and deploy a dynamic simulator and

  13. DOE Announces 2008 Federal Energy and Water Management Awards | Department

    Energy Savers [EERE]

    of Energy 2008 Federal Energy and Water Management Awards DOE Announces 2008 Federal Energy and Water Management Awards October 22, 2008 - 4:14pm Addthis Awards for Energy Efficiency and Renewable Energy Save Taxpayers $28 Million in Energy Costs WASHINGTON - The Department of Energy (DOE) today honored 22 employees each with a Federal Energy Water Management award for energy efficiency improvement efforts and innovative strategies in Federal Government, which saved taxpayers more than $28

  14. DOE Environmental Management Strategy and Experience for In-Situ

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decommissioning | Department of Energy Environmental Management Strategy and Experience for In-Situ Decommissioning DOE Environmental Management Strategy and Experience for In-Situ Decommissioning In situ decommissioning (ISD) is the permanent entombment of a contaminated facility. At present, ISD is not recognized or addressed in the Department of Energy (DOE) and Office of Environmental Management (EM) lexicon; however, ISD is not a revolutionary concept. Since the 1970s, the U.S. Nuclear

  15. DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Communication & Engagement » EM SSAB » DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum

  16. DOE - Office of Legacy Management -- SiteA

    Office of Legacy Management (LM)

    Illinois Site A/Plot M, Illinois, Decommissioned Reactor Site A D&D Program Site sitea_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Site A/Plot M Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires

  17. DOE - Office of Legacy Management -- ITL

    Office of Legacy Management (LM)

    New Mexico Inhalation Toxicology Laboratory, New Mexico, Site Other Regulatory Framework ITL_map The Inhalation Toxicology Laboratory site was a research facility originally created by the Atomic Energy Commission, a predecessor agency of U.S. Department of Energy (DOE), to study respiratory health issues. In 1996, as a result of decreasing DOE funding for the type of work conducted at the laboratory, DOE awarded a Cooperative Agreement to the Lovelace Respiratory Research Institute (Lovelace)

  18. DOE-STD-1073-2003; DOE Technical Stadnard Configuration Management

    Office of Environmental Management (EM)

    NOT MEASUREMENT SENSITIVE DOE-STD-1073-2003 October 2003 DOE STANDARD Configuration Management U.S. Department of Energy AREA CMAN Washington, D.C. 20585 DISTRIBUTION STATEMENT: Approved for public release; further dissemination unlimited. DOE-STD-1073-2003 Configuration Management This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax (301) 903-9823 or on

  19. DOE - NNSA/NFO -- Photo Library EM Waste Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Library > Photo Library > Waste Management NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Waste Management Foreseeing the need for environmental management at the Nevada Test Site, the U.S. Department of Energy Nevada Field Office formally established the Waste Management program in 1978. The program's primary mission is to manage radioactive waste generated by the U.S. Department of Energy and defense industry activities. Instructions: Click the

  20. Contract Management | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Management Ames Site Office (AMSO) AMSO Home About Projects Contract Management NEPA Documents Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 Contract Management Print Text Size: A A A FeedbackShare Page The Ames Site Office's Contract Management provides leadership and maximizes the effective working relationship between Department of Energy (DOE) and the contractor; manages and

  1. DOE Policy for Digital Research Data Management

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is responsible for advancing the energy, environmental, and nuclear security of the United States; promoting scientific and technological innovation in support of...

  2. Comprehensive Emergency Management System - DOE Directives, Delegation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Status: Current Approved Date: Nov 02, 2005 CRD: Yes DNFSB: Yes Related History Exemptions Standards Related to: DOE M 151.1-1, Power Marketing Administration...

  3. Federal Sustainable Print Management - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No DNFSB: No Related History Exemptions Standards Related to: DOE O 436.1, Departmental Sustainability There are no exemptions listed for this document. There are no Technical...

  4. DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program

    Office of Environmental Management (EM)

    3-93-Pt.2 November 1993 DOE STANDARD GUIDE FOR OPERATIONAL CONFIGURATION MANAGEMENT PROGRAM Including the Adjunct Programs of Design Reconstitution and Material Condition and Aging Management PART ll U.S. Department of Energy AREA CMAN Washington, D.C. 20585 DISTRIBUTION STATEMENT A: Approved for public release; distribution Is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical

  5. DOE Sustainability Reporting Open Line Help Call | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the SPO will be available on the call to answer specific questions with respect to Site Sustainability Plans (SSP) and the Consolidated Energy Data Report (CEDR). The Open Line...

  6. DOE-STD-1159-2003; DOE Standard Waste Management Functional Area Qualification Standard

    Office of Environmental Management (EM)

    59-2003 January 2003 DOE STANDARD WASTE MANAGEMENT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800)

  7. DOE Small Business Program Manager Directory

    Office of Environmental Management (EM)

    NAME INDIVIDUAL NAME TITLE PHONE EMAIL WEB LINK Chief Financial Officer (CF Dir & WCF) Paul Coombs SBPM (301) 903-5444 paul.coombs@hq.doe.gov http://www.energy.gov/cfo/office-chief-financial-officer Chief Human Capital Officer (HC) Scott Deters SBPM (202) 586-2273 scott.deters@hq.doe.gov http://www.energy.gov/hc/office-chief-human-capital-officer Chief Information Officer (IM) Diane McDonough SBPM (301) 903-2711 diane.mcdonough@hq.doe.gov

  8. DOE - Office of Legacy Management -- Fernald

    Office of Legacy Management (LM)

    Ohio Fernald Preserve, Ohio Key Documents and Links Fernald Preserve, Harrison, Ohio, Fact Sheet pdf_icon STAKEHOLDER REVIEW: Draft 2016 Comprehensive Legacy Management and Institutional Controls Plan (LMICP)-Revision 9; includes Summary of Significant Changes pdf_icon 2015 Comprehensive Legacy Management and Institutional Controls Plan (LMICP): Volume I-Legacy Management Plan pdf_icon 2015 Volume II-Institutional Controls Plan pdf_icon 2015 Attachment A pdf_icon 2015 Attachment B pdf_icon 2015

  9. 2014 DOE Project Management Workshop Presentations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1. PM Update - Paul Bosco, Director, Office of Acquisition & Project Management 2. Ethics - Marianne Jennings, W.P. Carey School of Business at Arizona State University 3. ...

  10. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 2 -- Nuclear Safety Basis Program Review During Design February 2015 i Standard Review Plan Volume 2 Nuclear Safety Basis Program Review during Design Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  11. DOE - NNSA/NFO -- Photo Library Environmental Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Environmental Management The Environmental Management Program Vision/Mission establishes the principles and goals for programmatic work, which encompasses management of waste and materials and corrective actions associated with contaminated sites and facilities. Instructions: Click the photograph THUMBNAIL to view the photograph details Click the Category, Number, or Date table header links to

  12. DOE Names Interim Manager for Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Names Interim Manager for Idaho Operations Office Dennis Miotla, the Office of Nuclear Energy's Deputy Assistant Secretary Dennis Miotla for Nuclear Power Deployment, has been named the interim manager of the U.S. Department of Energy's Idaho Operations Office, while the Department recruits a permanent manager. Mr. Miotla will succeed Elizabeth Sellers, who has served as Idaho Operations Office Manager from April, 2003. Sellers plans to retire from federal service in February. "Under

  13. DOE Orders Self-Study Program - DOE-STD-1073-2003, Configuration Management

    Office of Environmental Management (EM)

    | Department of Energy 73-2003, Configuration Management DOE Orders Self-Study Program - DOE-STD-1073-2003, Configuration Management U.S. Department of Energy Orders Self-Study Program DOE-STD-1073-2003, Configuration Management Familiar Level - August 2011 The familiar level of this module is divided into three sections. The first section covers chapters 1 through 3. The second section covers chapters 4 and 5. Chapters 6 and 7 are covered in section three. We have provided examples

  14. DOE - Office of Legacy Management -- Maywood Site - NJ 10

    Office of Legacy Management (LM)

    of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. Aerial Photograph of the Maywood, New Jersey, Site NJ.10-1 - DOE Letter;...

  15. DOE - Office of Legacy Management -- Abandoned Uranium Mines

    Office of Legacy Management (LM)

    Uranium Mines Report to Congress The U.S. Department of Energy (DOE) Office of Legacy Management completed a report on defense-related uranium mines in consultation with...

  16. DOE - Office of Legacy Management -- El_Verde

    Office of Legacy Management (LM)

    Rico El Verde, Puerto Rico, Site Other Regulatory Framework elverde The DOE Office of Legacy Management assumed responsibility for a tree in Study Area 4 of El Verde site in 2005....

  17. DOE - Office of Legacy Management -- Colonie - NY 06

    Office of Legacy Management (LM)

    of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. NY.06-1 - DOE Report (DOEOR20722-53); Colonie Interim Storage Site...

  18. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Energy Savers [EERE]

    Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis ...

  19. DOE Announces Policy for Managing Excess Uranium Inventory

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today released a Policy Statement on the management of the Department of Energy's (DOE) excess uranium inventory, providing the framework...

  20. 1993 DOE technical standards managers workshop: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    This workshop is focused on the benefits of the DOE technical standards program, which is focused toward the preferred use of non-Government standards for DOE activities and the development of DOE technical standards when non-Government standards are not available or are inappropriate. One goal of the program is to replace redundant site-specific standards with more universally accepted documents that have been scrutinized by experts. This replacement is discussed at the workshop along with the problems encountered and solutions found. The workshop provided an opportunity for geographically dispersed people to meet and advance their standards knowledge and efforts to support the program. Safety issues have been the driving force behind the program to date. Several companies offer products and services that support the development, processing, and retrieval of standards. This document mostly comprise vugraphs.

  1. Management Alert: DOE/IG-0906 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Alert: DOE/IG-0906 Management Alert: DOE/IG-0906 April 9, 2014 Review of Internal Controls for Protecting Non-Public Information at the Federal Energy Regulatory Commission In March 2014, the Office of Inspector General initiated a review of internal controls for protecting non-public information at the Federal Energy Regulatory Commission (Commission). The review was initiated in response to requests from the Senate Energy Natural Resources Committee and also the Commission regarding

  2. Oak Ridge National Laboratory DOE Oak Ridge Environmental Management Program

    Office of Environmental Management (EM)

    National Laboratory DOE Oak Ridge Environmental Management Program Background The U.S. Department of Energy's (DOE) Oak Ridge Reservation includes several contaminated areas that are a result of years of operation at Oak Ridge National Laboratory (ORNL). To better address the restoration of ORNL, the Environmental Management program has divided ORNL into two major areas: Bethel Valley and Melton Valley. The Bethel Valley area includes the principal research facilities. The Melton Valley Area was

  3. Management Alert: DOE/IG-0906 | Department of Energy

    Energy Savers [EERE]

    Management Alert: DOE/IG-0906 Management Alert: DOE/IG-0906 April 9, 2014 Review of Internal Controls for Protecting Non-Public Information at the Federal Energy Regulatory Commission In March 2014, the Office of Inspector General initiated a review of internal controls for protecting non-public information at the Federal Energy Regulatory Commission (Commission). The review was initiated in response to requests from the Senate Energy Natural Resources Committee and also the Commission regarding

  4. 2016 DOE Project Management Workshop - Area Restaurants | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Area Restaurants 2016 DOE Project Management Workshop - Area Restaurants Information on surrounding area restaurants PDF icon Area restaurants More Documents & Publications 2015 APM Workshop - Surrounding Area Restaurants Surrond Area Resturants Directory of Potential Stakeholders for DOE Actions under NEPA

  5. Forms Management Guide for use with DOE O 200.1, Information Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-05-08

    Provides guidance for the development, analysis, approval, and management of forms in the U.S. Department of Energy (DOE). No cancellations.

  6. DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program

    Office of Environmental Management (EM)

    1 CHAPTER 2 IMPLEMENTATION GUIDANCE FOR OPERATIONAL CONFIGURATION MANAGEMENT This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. 2.1 PROGRAM MANAGEMENT ELEMENT The program management element of a configuration management (CM) program coordinates program development and implementation and ensures overall program

  7. DOE - Office of Legacy Management -- Directions

    Office of Legacy Management (LM)

    Mailing: U.S. Department of Energy 10995 Hamilton-Cleves Hwy. Harrison, OH 45030 U.S. Department of Energy Office of Legacy Management Contractor Navarro Research and Engineering, ...

  8. DOE Awards Contract for Management of WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEWS NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE Tom Welch, 202/586-4316 October 12, 2000 Greg Sahd (Carlsbad), 505/234-7532 Department of Energy Competitively Awards Contract for the Management of Waste Isolation Pilot Plant Secretary of Energy Bill Richardson today announced that the Energy Department will award a $500 million, five-year contract for the management and operation of the department's Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico, to Westinghouse TRU Solutions LLC.

  9. DOE - Office of Legacy Management -- Park

    Office of Legacy Management (LM)

    West Virginia Parkersburg, West Virginia, Disposal Site A Nuclear Waste Policy Act Section 151 Site parkersburg_map The Parkersburg Disposal Site was remediated by the owner under the U.S. Nuclear Regulatory Commission Site Decommissioning Management Program and transferred to the federal government under Section 151 of the Nuclear Waste Policy Act. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and

  10. DOE - Office of Legacy Management -- CERCLA Home

    Office of Legacy Management (LM)

    Office of Site Operations > Programs & Facilities > CERCLA Home Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Search CERCLA Collections Request Documents CERCLA Help What is CERCLA? The Office of Legacy Management currently manages seven sites where remediation was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. These sites were

  11. DOE - Office of Legacy Management -- Fernald Environmental Management

    Office of Legacy Management (LM)

    Project - 027 Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center, is located about 18 miles northwest of

  12. DOE methods for evaluating environmental and waste management samples

    SciTech Connect (OSTI)

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K.

    1994-10-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) is a resource intended to support sampling and analytical activities for the evaluation of environmental and waste management samples from U.S. Department of Energy (DOE) sites. DOE Methods is the result of extensive cooperation from all DOE analytical laboratories. All of these laboratories have contributed key information and provided technical reviews as well as significant moral support leading to the success of this document. DOE Methods is designed to encompass methods for collecting representative samples and for determining the radioisotope activity and organic and inorganic composition of a sample. These determinations will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the U.S. Environmental Protection Agency, or others. The development of DOE Methods is supported by the Analytical Services Division of DOE. Unique methods or methods consolidated from similar procedures in the DOE Procedures Database are selected for potential inclusion in this document. Initial selection is based largely on DOE needs and procedure applicability and completeness. Methods appearing in this document are one of two types, {open_quotes}Draft{close_quotes} or {open_quotes}Verified{close_quotes}. {open_quotes}Draft{close_quotes} methods that have been reviewed internally and show potential for eventual verification are included in this document, but they have not been reviewed externally, and their precision and bias may not be known. {open_quotes}Verified{close_quotes} methods in DOE Methods have been reviewed by volunteers from various DOE sites and private corporations. These methods have delineated measures of precision and accuracy.

  13. Qualification of Three On-line Slurry Monitoring Devices for Application during Waste Retrieval Operations at DOE Sites

    SciTech Connect (OSTI)

    Bontha, Jagannadha R.; Bamberger, Judith A.; Hylton, Tom D.; May, T. H.

    2000-10-18

    Qualification of Three On-line Slurry Monitoring Devices for Application during Waste Retrieval Operations at DOE Sites

  14. DOE P 141.1 – Department of Energy Management of Cultural Resources (DOE, 2001)

    Broader source: Energy.gov [DOE]

    The purpose of this Policy is (1) to ensure that U.S. Department of Energy (DOE) programs, including the National Nuclear Security Administration (NNSA), and field elements integrate cultural resources management into their missions and activities, and (2) to raise the level of awareness and accountability among DOE (including NNSA) contractors concerning the importance of DOE's cultural resource-related legal and trust responsibilities.

  15. NNSA project receives DOE Secretary's Award for Project Management

    National Nuclear Security Administration (NNSA)

    Improvement | National Nuclear Security Administration project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios

  16. DOE - Office of Legacy Management -- Columbus

    Office of Legacy Management (LM)

    Columbus, Ohio, Sites Other Regulatory Framework columbusClosure2013 The Columbus, Ohio, Sites consist of two separate properties owned by the Battelle Memorial Institute: the King Avenue site, located in the city of Columbus, and the West Jefferson site, located approximately 15 miles west of Columbus. Battelle conducted extensive nuclear research at both locations for the U.S. Department of Energy (DOE) and its predecessor agencies between 1943 and 1986. The facilities have been decontaminated

  17. DOE - Office of Legacy Management -- Edge

    Office of Legacy Management (LM)

    South Dakota Edgemont, South Dakota, Disposal Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites-Edgemont, South Dakota, Disposal Site Long-Term Surveillance Plan for the DOE Tennessee Valley Authority (UMTRCA Title II) Disposal Site, Edgemont, South Dakota Please be green. Do not print these documents unless absolutely

  18. DOE - Office of Legacy Management -- Sherwood

    Office of Legacy Management (LM)

    Washington Sherwood, Washington, Disposal Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites-Sherwood, Washington, Disposal Site July 2015 Groundwater Sampling at the Sherwood, Washington, Disposal Site Long-Term Surveillance Plan for the DOE Sherwood Project (UMTRCA Title II) Reclamation Cell Wellpinit, Washington Please be

  19. DOE - Office of Legacy Management -- Blue

    Office of Legacy Management (LM)

    New Mexico Bluewater, New Mexico, Disposal Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet May and June 2015 Groundwater and Surface Water Sampling at the Bluewater, New Mexico, Disposal Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Site-Bluewater, New Mexico, Disposal Site Long-Term Surveillance Plan for the DOE Bluewater (UMTRCA Title II) Disposal Site, Near Grants,

  20. DOE - Office of Legacy Management -- Gasbuggy

    Office of Legacy Management (LM)

    New Mexico Gasbuggy, New Mexico, Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Interagency Agreement between DOE, BLM, and USDA Please be green. Do not print these documents unless absolutely necessary. Submit a FOIA Request for documents not available through this website. Status of Pending Decision Documents Long-Term Surveillance Plan Under development All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data

  1. DOE - Office of Legacy Management -- LEHR

    Office of Legacy Management (LM)

    California Laboratory for Energy-Related Health Research (LEHR), California, Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Record of Decision Proposed Plan Overview of the Proposed Plan DOE Areas Remedial investigation Report Feasibility Study Risk Assessment Long-Term Surveillance and Maintenance Plan Remedial Design/Remedial Action Work Plan CERCLA Administrative Record Land-Use Covenant Please be green. Do not print these documents

  2. DOE - Office of Legacy Management -- Riverton

    Office of Legacy Management (LM)

    Riverton, Wyoming Processing Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Refining the site conceptual model at a former uranium mill site in Riverton, Wyoming, USA (Environmental Earth Sciences journal) Enhanced Characterization of Surficial Aquifer (fact sheet) Where Does My Drinking Water Come From? (fact sheet) May 10, 2012: Data Review and Validation Report of May 3, 2012, Sampling Event ALS Environmental Laboratory Report on May 3,

  3. DOE Idaho Operations Office Manager Elizabeth Sellers leaving Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Idaho Operations Office Manager Elizabeth Sellers leaving Department Elizabeth Sellers, manager of the U.S. Department of Energy�s Idaho Operations Office, announced today that she will retire from United States government service in February. Elizabeth Sellers, manager of the U.S. Department of Energy�s Idaho Operations Office �I have thoroughly enjoyed my time in Idaho, and my 26 years serving the United States Department of Energy,� said Sellers, who has served the DOE since 1983.

  4. DOE Releases Electricity Subsector Cybersecurity Risk Management Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (RMP) Guideline | Department of Energy Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline DOE Releases Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline May 23, 2012 - 9:30am Addthis News Media Contact: (202) 586-4940 For Immediate Release: May 23, 2012 Department of Energy Releases Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline Public-Private Sector Collaboration Produces Guidance to Help Electric Utilities

  5. DOE - Office of Legacy Management -- GrnRiv

    Office of Legacy Management (LM)

    Utah Green River, Utah, Disposal Site UMTRCA Title I site grn_map The Green River disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Green River site, view the fact sheet.

  6. DOE - Office of Legacy Management -- Lake_D

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site laked_map The Lakeview Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Lakeview site, view the fact sheet. Site Documents and Links

  7. DOE - Office of Legacy Management -- Lake_P

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site lakep_map The Lakeview processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Lakeview site, view the fact sheet. Site Documents and Links Contact

  8. DOE - Office of Legacy Management -- Maybell_West(2)

    Office of Legacy Management (LM)

    Maybell West, Colorado, Disposal Site UMTRCA Title II site Maybell West The Maybell West disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2010 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Maybell West site, view the

  9. DOE - Office of Legacy Management -- MexHat

    Office of Legacy Management (LM)

    Utah Mexican Hat, Utah, Disposal Site UMTRCA Title I site mex_map The Mexican Hat disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Mexican Hat site, view the fact sheet.

  10. DOE - Office of Legacy Management -- Dur_D

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site durd_map The Durango Disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Durango site, view the fact sheet. Site Documents and Links

  11. DOE - Office of Legacy Management -- Dur_P

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site durp_map The Durango processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Durango site, view the fact sheet. Site Documents and Links Contact Us

  12. DOE - Office of Legacy Management -- Gun_D

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site gund_map The Gunnison Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Gunnison site, view the fact sheet. Site Documents and Links

  13. DOE - Office of Legacy Management -- Gun_P

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site gunp_map The Gunnison Processing Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Gunnison site, view the fact sheet. Site Documents and Links Contact

  14. DOE - Office of Legacy Management -- Nat_D

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site natd_map The Naturita Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Naturita site, view the fact sheet. Site Documents and Links

  15. DOE - Office of Legacy Management -- Nat_P

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site natp_map The Naturita processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Naturita site, view the fact sheet. Site Documents and Links Contact

  16. DOE - Office of Legacy Management -- Rifle_D

    Office of Legacy Management (LM)

    Rifle, Colorado, Disposal Site UMTRCA Title I site rifled_map The Rifle Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Rifle site, view the fact sheet. Site Documents

  17. DOE - Office of Legacy Management -- Rifle_Old

    Office of Legacy Management (LM)

    Old Rifle, Colorado, Processing Site UMTRCA Title I site rifleold_map The Old Rifle processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Old Rifle site, view the fact sheet. Site

  18. DOE - Office of Legacy Management -- SLC_D

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site slcd_map The Salt Lake City disposal site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Salt Lake City site, view the fact sheet. Site Documents

  19. DOE - Office of Legacy Management -- SLC_P

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site slcp_map The Salt Lake City processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Salt Lake City site, view the fact sheet. Site Documents and

  20. DOE - Office of Legacy Management -- Slick_D

    Office of Legacy Management (LM)

    Disposal Site UMTRCA Title I site slickd_map The Slick Rock Disposal Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I disposal site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Slick Rock site, view the fact sheet. Site Documents and

  1. DOE - Office of Legacy Management -- Slick_P

    Office of Legacy Management (LM)

    Processing Site UMTRCA Title I site Slick Rock P updated The Slick Rock processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Slick Rock site, view the fact sheet. Site Documents and

  2. DOE Facility Management Contracts Facility Owner Contractor

    Office of Environmental Management (EM)

    transition) 6/15/1999 6/30/2011 2 three month option periods 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 Bill Creech 859-219-4044 Argonne National Laboratory SC UChicago Argonne, LLC 7/31/2006 9/30/2015 4 yrs Award Term

  3. DOE Facility Management Contracts Facility Owner Contractor

    Office of Environmental Management (EM)

    3/31/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Portsmouth Remediation EM LATA/Parallax 1/10/2005 2/28/2011 2/28/2011 Site Clean up 2005 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 RJ Bell 859 -219-4055 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009

  4. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 4 - Nuclear Safety Basis Program Review During Facility Decommissioning and Environmental Restoration February 2015 i Standard Review Plan Volume 4 Nuclear Safety Basis Program Review during Facility Decommissioning and Environmental Restoration Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February

  5. water-management | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Management R&D Water research encompasses the need to reduce the amount of freshwater used by power plants and to minimize any potential impacts of plant operations on water quality. The vision for this program area is to develop a 21st century America that can count on abundant, sustainable fossil energy and water resources to achieve the flexibility, efficiency, reliability, and environmental quality essential for continued security and economic health. To accomplish this,

  6. DOE - Office of Legacy Management -- Maxey

    Office of Legacy Management (LM)

    Kentucky Maxey Flats, Kentucky, Site A CERCLA site maxey_map Remediation at the Maxey Flats site was conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations. The site transferred to the Office of Legacy Management in 2004 and requires records-related activities and stakeholder support. For more information about the Maxey Flats site, view the fact sheet. Site Documents and Links Contact Us Last Updated: 8/5

  7. DOE - Office of Legacy Management -- Pinellas

    Office of Legacy Management (LM)

    Florida Pinellas County, Florida, Site Applying Innovative Solutions to Environmental Restoration A CERCLA and/or RCRA Site pinellas_map Remediation at the Pinellas County Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The site transferred to the Office of Legacy Management in 2004 and requires operation and maintenance of remedial action systems, routine

  8. DOE - Office of Legacy Management -- Sherwood

    Office of Legacy Management (LM)

    Washington Sherwood, Washington, Disposal Site UMTRCA Title II site sherwood_map The Sherwood Disposal Site was a uranium processing site addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). The site transferred to the Office of Legacy Management in 2003 and is administered under the provisions of a general NRC license. The site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Sherwood

  9. DOE - Office of Legacy Management -- Blue

    Office of Legacy Management (LM)

    Mexico Bluewater, New Mexico, Disposal Site UMTRCA Title II site bluewater_map The Bluewater disposal site was a uranium-ore-processing site addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). The site transferred to the Office of Legacy Management in 2003 and is administered under the provisions of a general NRC license. The site requires routine inspection and maintenance, groundwater monitoring, records-related activities, and stakeholder support. For more

  10. DOE - Office of Legacy Management -- Fernald

    Office of Legacy Management (LM)

    Fernald Preserve, Ohio A CERCLA site Fernald Aerial Remediation at the Fernald Preserve was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations. The site transferred to the Office of Legacy Management in 2006 and requires operation and maintenance of remedial action systems, environmental monitoring, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Fernald

  11. DOE - Office of Legacy Management -- LEHR

    Office of Legacy Management (LM)

    California Laboratory for Energy-Related Health Research (LEHR), California, Site A CERCLA site lehr_map Remediation at the Laboratory for Energy-Related Health Research (LEHR) site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations. The site transferred to the Office of Legacy Management in 2006 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about

  12. DOE - Office of Legacy Management -- Lbar

    Office of Legacy Management (LM)

    New Mexico L-Bar, New Mexico, Disposal Site UMTRCA Title II site lbar_map The L-Bar disposal site was a uranium-ore-processing site addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). The site transferred to the Office of Legacy Management in 2003 and is administered under the provisions of a general NRC license. The site requires routine inspection and maintenance, groundwater monitoring, records-related activities, and stakeholder support. For more information

  13. DOE - Office of Legacy Management -- Monticello

    Office of Legacy Management (LM)

    Utah Monticello, Utah, Disposal and Processing Sites A CERCLA and/or RCRA Site monticello_map Remediation at the Monticello Sites was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The sites transferred to the Office of Legacy Management in 2003 and require operation and maintenance of remedial action systems, routine inspection and maintenance, records-related

  14. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    Ohio Mound, Ohio, Site A CERCLA and/or RCRA Site Mound2014 Remediation of the Mound, Ohio, Site was conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The site long-term monitoring responsibility transferred to the Office of Legacy Management(LM) in 2010 and requires operation and maintenance of a pump and treatment system, groundwater monitoring, institutional controls monitoring, records-related activities, and stakeholder support.

  15. DOE - Office of Legacy Management -- Pinellas

    Office of Legacy Management (LM)

    Florida Pinellas County, Florida, Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Long-Term Surveillance and Maintenance Plan for the Pinellas Site Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2015 Semiannual Progress Report for the 4.5 Acre Site June Through November 2015 Draft Building 100 Area Plume Management Alternatives Analysis (March 2012) Building 100 Area Site

  16. DOE - Office of Legacy Management -- Shirley

    Office of Legacy Management (LM)

    Wyoming Shirley Basin South, Wyoming, Disposal Site UMTRCA Title II site shirley_map The Shirley Basin South disposal site was a uranium-ore-processing site addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). The site transferred to the Office of Legacy Management in 2003 and is administered under the provisions of a general NRC license. The site requires routine inspection and maintenance, groundwater monitoring, records-related activities, and stakeholder

  17. DOE - Office of Legacy Management -- Weldon

    Office of Legacy Management (LM)

    Missouri Weldon Spring, Missouri, Site A CERCLA site weldon_map Remediation at the Weldon Spring Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations. The Weldon Spring Site was transferred to the Office of Legacy Management (LM) in 2003. LM conducts long-term surveillance and maintenance at the site which includes routine inspections, site maintenance, records-related activities, stakeholder support, and operation of an

  18. DOE - Office of Legacy Management -- Edge

    Office of Legacy Management (LM)

    South Dakota Edgemont, South Dakota, Disposal Site UMTRCA Title II site edgemont_map The Edgemont Disposal Site was a uranium processing site addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). The site transferred to the Office of Legacy Management in 2003 and is administered under the provisions of a general NRC license. The site requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the

  19. DOE NNSA Site Facility Management Contracts - MASTER.xlsx

    Energy Savers [EERE]

    Site Facility Management Contracts November 2015 Contract Title Program Contractor Composition of Contractor Contract Number Contract Type Business Model FY Competed Award Date Current Contract End date Options/Award Term Remaining Ultimate Potential Contract End Date (includes all potential award term and option years) DOE Site Procurement Director DOE Contracting Officer National Renewable Energy Laboratory (NREL) EERE Alliance for Sustainable Energy (ASE) Battelle Memorial Institute,

  20. Management Alert: DOE/IG-0939 | Department of Energy

    Office of Environmental Management (EM)

    Alert: DOE/IG-0939 Management Alert: DOE/IG-0939 June 4, 2015 Review of Allegations of Improper Disclosure of Confidential, Nonpublic Federal Energy Regulatory Commission Information The Federal Energy Regulatory Commission (Commission or FERC), an independent regulatory agency officially organized as part of the Department of Energy, is composed of five Commissioners (including a Chairman). The Commission's Office of Enforcement (OE) seeks to encourage compliance with energy-related statutes,

  1. DOE F 242.1 Forms Manager Designation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2.1 Forms Manager Designation DOE F 242.1 Forms Manager Designation PDF icon DOE F 242.1, Forms Manager Designation.pdf More Documents & Publications DOE F 243.3 DOE F 243.4 DOE F ...

  2. Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request

    Broader source: Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2016.

  3. Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-01

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Replaces DOE G 450.4-1A. Canceled by DOE G 450.4-1C.

  4. DOE - Office of Legacy Management -- Gen_Atomics

    Office of Legacy Management (LM)

    General Atomics Hot Cell Facility, California, Site A Oakland Operations Office site gen_atomics_map The General Atomics Hot Cell Facility site was a research laboratory formerly operated under the DOE Oakland Operations Office, California. After remediation, the site transferred to the Office of Legacy Management in 2005. The site requires records management and stakeholder support. For more information about the General Atomics Hot Cell

  5. NUMBERED MEMORANDUM Records Management 2007-08, DOE-STD-4001-2000 |

    Office of Environmental Management (EM)

    Department of Energy NUMBERED MEMORANDUM Records Management 2007-08, DOE-STD-4001-2000 NUMBERED MEMORANDUM Records Management 2007-08, DOE-STD-4001-2000 Design Criteria Standard For Eletronic Records Management Software Applications PDF icon NUMBERED MEMORANDUM Records Management 2007-08, DOE-STD-4001-2000 More Documents & Publications DOE-STD-4001-2000 Electronic Records Management Software Applications Design Criteria Standard Technical Standards, DOE Orders and Applicable CFRs/DEAR

  6. 2016 DOE Project Management Workshop - Hotel Dining | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Hotel Dining 2016 DOE Project Management Workshop - Hotel Dining Menu for Sheraton's hotel restaurant, Potomac Restaurant and Lounge PDF icon Menu More Documents & Publications Sheraton Restaurant Menu 2015 APM Workshop - Sheraton Restaurant Menu_Potomac Antje Wittenberg, Directorate General for Enterprise and Industry, The EU Raw Materials Initiative and the Report of the Ad-hoc Group

  7. 2016 DOE Project Management Workshop - Transportation | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Transportation 2016 DOE Project Management Workshop - Transportation Complimentary guest shuttle service provided by Sheraton Pentagon City Hotel. PDF icon Shuttle service More Documents & Publications 2015 APM Workshop - Sheraton Pentagon Shuttle Fact Sheet Shuttle Schedule Alexandria Hilton Shuttle Schedule

  8. DOE - Office of Legacy Management -- Rifle_New

    Office of Legacy Management (LM)

    New Rifle, Colorado, Processing Site UMTRCA Title I site Rifle_New_Map_11/30/2011 The New Rifle processing site, a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is licensed to DOE for long-term custody and managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the New Rifle site, view the fact

  9. DOE-RL Integrated Safety Management System Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-09-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  10. DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program

    Office of Environmental Management (EM)

    85 CHAPTER 4 IMPLEMENTATION GUIDANCE FOR MATERIAL CONDITION AND AGING MANAGEMENT This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. As shown in Figure 4-1, Material Condition and Aging Management (MCA) activities are developed and implemented in three distinct phases: a preliminary phase, a detailed or main phase, and an

  11. Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-01

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1C.

  12. DOE TRANSCOM Technical Support Services DE-EM0002903 ATTACHMENT J-9: DOE OFFICE OF ENVIRONMENTAL MANAGEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATTACHMENT J-9: DOE OFFICE OF ENVIRONMENTAL MANAGEMENT FY 13 ANNUAL PERFORMANCE AGREEMENT FY13 Annual Performance Agreement U.S. Department of Energy Office of Environmental Management 11/28/2012 Office of Environmental Management Office of Environmental Management Page 2 Page Intentionally Blank Office of Environmental Management Page 3 FY 2013 Performance Agreement with the Senior Advisor for the Office of Environmental Management The Office of Environmental Management (EM) is working to

  13. DOE-RL Integrated Safety Management System Program Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-06-29

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight.

  14. Comments at the DOE Environmental Management Budget Workshop

    Office of Environmental Management (EM)

    at the DOE Environmental Management Budget Workshop Ron Woody, Chairman of ORRCA and Roane County Executive April 29, 2015 Hello, I'm Ron Woody, Roane County Executive and Chairman of the Oak Ridge Reservation Communities Alliance (ORRCA). ORRCA was formerly the Local Oversight Committee and ORRCA was chartered in 2011 with participants/members of Anderson, Morgan, Knox and Roane County Mayors/Executives and the Mayor of the City of Oak Ridge. ORRCA approves an annual work plan which, in

  15. Order Module--DOE O 435.1 RADIOACTIVE WASTE MANAGEMENT | Department of

    Energy Savers [EERE]

    Energy 5.1 RADIOACTIVE WASTE MANAGEMENT Order Module--DOE O 435.1 RADIOACTIVE WASTE MANAGEMENT DOE Order 5820.2A, Radioactive Waste Management, was issued by DOE in September 1988. As early as 1990, DOE began analyzing, assessing, and reviewing the process of implementing the Order. DOE revised the Order on radioactive waste management for several reasons: - After thorough technical reviews and analyses, DOE and the Defense Nuclear Facilities Safety Board concluded that DOE Order 5820.2A did

  16. Implementing Information Security and Its Technology: A LineManagement...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 29; 99; INFORMATION SYSTEMS; MANAGEMENT; SECURITY cybersecurity cyberlaw information management privacy Word...

  17. DOE Order Self Study Modules - DOE O 460.1C Packaging and Transportation Safety and DOE O 460.2A Departmental Materials Transportation and Packaging Management

    Office of Environmental Management (EM)

    60.1C PACKAGING AND TRANSPORTATION SAFETY DOE O 460.2A DEPARTMENTAL MATERIALS TRANSPORTATION AND PACKAGING MANAGEMENT DOE O 460.1C and 460.2A Familiar Level June 2011 1 DOE O 460.1C PACKAGING AND TRANSPORTATION SAFETY DOE O 460.2A DEPARTMENTAL MATERIALS TRANSPORTATION AND PACKAGING MANAGEMENT FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1.

  18. DOE Policy 141.1: Management of Cultural Resources | Department of Energy

    Office of Environmental Management (EM)

    Policy 141.1: Management of Cultural Resources DOE Policy 141.1: Management of Cultural Resources The purpose of DOE Policy 141.1 is to ensure that Department of Energy (DOE) programs and field elements integrate cultural resources management into their missions and activities and to raise the level of awareness and accountability among DOE contractors concerning the importance of the Department's cultural resource-related legal and trust responsibilities. Download Document PDF icon DOE

  19. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  20. NEW - DOE O 361.1C, Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program.

  1. DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

  2. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)

    SciTech Connect (OSTI)

    N /A

    2001-05-01

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  3. [DOE method for evaluating environmental and waste management samples: Revision 1, Addendum 1

    SciTech Connect (OSTI)

    Goheen, S.C.

    1995-04-01

    The US Dapartment of Energy`s (DOE`s) environmental and waste management (EM) sampling and analysis activities require that large numbers of samples be analyzed for materials characterization, environmental surveillance, and site-remediation programs. The present document, DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods), is a supplemental resource for analyzing many of these samples.

  4. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Cancels DOE 3790.1B, Except VIII; attach. 2, para. 2C, 2D(2)-(3), 2E(1)-(8), attach. 3, para. 2C, 2D(2)-(3), 2E(1)-(7), of DOE 5480.4; DOE 5480.7A; DOE 5480.8A; DOE 5480.9A; DOE 5480.10; DOE 5480.16A; DOE 5483.1A

  5. DI-MGMT-81861 DOE Changes Version -- Integrated Program Management Report |

    Office of Environmental Management (EM)

    Department of Energy DI-MGMT-81861 DOE Changes Version -- Integrated Program Management Report DI-MGMT-81861 DOE Changes Version -- Integrated Program Management Report Integrated Program Management Report (IPMR) combines the Contractor Performance Report (CPR) and Integrated Master Schedule (IMS) reporting requirements on contracts requiring Earned Value Management (EVM) reporting of project/contract performance. PDF icon DOE IPMR DID -- Changes Version More Documents & Publications

  6. DOE Order Self Study Modules - DOE G 450.4-1B Integrated Safety Management Systems Guide

    Office of Environmental Management (EM)

    G 450.4-1B INTEGRATED SAFETY MANAGEMENT SYSTEM GUIDE ALBUQUERQUE OPERATIONS OFFICE Change No: 0 DOE G 450.4-1B Level: Familiar Date: 6/15/01 1 DOE G 450.4-1B INTEGRATED SAFETY MANAGEMENT SYSTEM (ISMS) GUIDE FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. State the purpose of DOE G 450.4, ISMS Guide. 2. State the objectives of DOE G 450.4, ISMS Guide.

  7. Earned Value Management System (EVMS) - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0A, Earned Value Management System (EVMS) by Rick Blaisdell Functional areas: Capital Assets, Contract Management, Program Management, Project Management This Guide provides...

  8. DOE-STD-1155-2002; Transportation and Traffic Management Functional Area Qualification

    Office of Environmental Management (EM)

    DOE-STD-1155-2002 September 2002 DOE STANDARD TRANSPORTATION AND TRAFFIC MANAGEMENT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1155-2002 This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of

  9. DOE-STD-1175-2003; Senior Technical Safety Manager Functional Area Qualification Standard

    Office of Environmental Management (EM)

    MEASUREMENT DOE-STD-1175-2003 December 2003 DOE STANDARD SENIOR TECHNICAL SAFETY MANAGER FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1175-2003 ii This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services,

  10. DOE-STD-1177-2004; Emergency Management Functional Area Qualification Standard

    Office of Environmental Management (EM)

    DOE-STD-1177-2004 January 2004 DOE STANDARD EMERGENCY MANAGEMENT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1177-2004 i This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services,

  11. DOE-STD-1180-2004; Construction Management Functional Area Qualification Standard

    Office of Environmental Management (EM)

    MEASUREMENT SENSITIVE DOE-STD-1180-2004 March 2004 DOE STANDARD CONSTRUCTION MANAGEMENT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1180-2004 i This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S.

  12. DOE-STD-1181-2004; Facility Maintenance Management Functional Area Qualification Standard

    Office of Environmental Management (EM)

    DOE-STD-1181-2004 March 2004 DOE STANDARD FACILITY MAINTENANCE MANAGEMENT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1181-2004 i This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of

  13. Senior Managers' Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-10-25

    This Guide provides a summary description of environmental management systems (EMSs) for DOE senior managers, including their responsibilities as they apply to the successful implementation of an Integrated Safety Management Systems/EMS and the expected benefits to be derived from such implementation. Canceled by DOE N 251.82.

  14. DOE handbook: Integrated safety management systems (ISMS) verification team leader`s handbook

    SciTech Connect (OSTI)

    1999-06-01

    The primary purpose of this handbook is to provide guidance to the ISMS verification Team Leader and the verification team in conducting ISMS verifications. The handbook describes methods and approaches for the review of the ISMS documentation (Phase I) and ISMS implementation (Phase II) and provides information useful to the Team Leader in preparing the review plan, selecting and training the team, coordinating the conduct of the verification, and documenting the results. The process and techniques described are based on the results of several pilot ISMS verifications that have been conducted across the DOE complex. A secondary purpose of this handbook is to provide information useful in developing DOE personnel to conduct these reviews. Specifically, this handbook describes methods and approaches to: (1) Develop the scope of the Phase 1 and Phase 2 review processes to be consistent with the history, hazards, and complexity of the site, facility, or activity; (2) Develop procedures for the conduct of the Phase 1 review, validating that the ISMS documentation satisfies the DEAR clause as amplified in DOE Policies 450.4, 450.5, 450.6 and associated guidance and that DOE can effectively execute responsibilities as described in the Functions, Responsibilities, and Authorities Manual (FRAM); (3) Develop procedures for the conduct of the Phase 2 review, validating that the description approved by the Approval Authority, following or concurrent with the Phase 1 review, has been implemented; and (4) Describe a methodology by which the DOE ISMS verification teams will be advised, trained, and/or mentored to conduct subsequent ISMS verifications. The handbook provides proven methods and approaches for verifying that commitments related to the DEAR, the FRAM, and associated amplifying guidance are in place and implemented in nuclear and high risk facilities. This handbook also contains useful guidance to line managers when preparing for a review of ISMS for radiological facilities, non-nuclear, or non-Defense Programs facilities. DOE line managers are encouraged to tailor the procedures described in this handbook for ISMS verifications for low risk facilities.

  15. DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to Boston Government Services, LLC of Lenoir City, Tennessee for support services to the DOE Office of Environmental Management.

  16. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-12

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Cancels DOE G 433.1-1.

  17. DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental...

  18. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-09

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Admin Chg 1, dated 6-14-13, supersedes DOE G 433.1-1A.

  19. DOE Selects Lawrence Livermore National Security, LLC to Manage its Lawrence Livermore National Laboratory

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Lawrence Livermore National Security, LLC (LLNS) has been selected to be the management and operating contractor for DOE's...

  20. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    1 -- Nuclear Safety Basis Program Review Overview and Management Oversight February 2015 i Standard Review Plan Volume 1 Nuclear Safety Basis Program Review Overview and Management Oversight Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii

  1. DOE Policy for Digital Research Data Management: FAQs

    Broader source: Energy.gov [DOE]

    Requirements, Guidance, and FAQs specific to the sponsoring DOE office can be found under the Requirements and Guidance from DOE Sponsoring Offices.​ ​

  2. DOE - Office of Legacy Management -- University of California...

    Office of Legacy Management (LM)

    Final DOE Areas Feasibility Study Appendices FINAL DOE AREAS FEASIBILITY STUDY for the: LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH UNIVERSITY OF CALIFORNIA, DAVIS Annual Site ...

  3. DOE Environmental Management Strategy and Experience for In-Situ...

    Office of Environmental Management (EM)

    2009 This page is deliberately blank. DOE EM Strategy and Experience for In Situ ......... 4 2.1 DOE-EM Endorsement of ISD Approach ...

  4. Staffing Guide for Project Management - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19 Admin Chg 1, Staffing Guide for Project Management by Brian Kong Functional areas: Administrative Change, Program Management, Project Management This Guide provides an approach...

  5. Risk Management Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7A, Risk Management Guide by John Makepeace Functional areas: Risk Management, Safety and Security This Guide provides non-mandatory risk management approaches for implementing the...

  6. DOE Selects ASE to Manage and Operate its National Renewable Energy

    Energy Savers [EERE]

    Laboratory | Department of Energy ASE to Manage and Operate its National Renewable Energy Laboratory DOE Selects ASE to Manage and Operate its National Renewable Energy Laboratory July 29, 2008 - 2:40pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today announced the Alliance for Sustainable Energy (ASE) LLC has been selected as the management and operating contractor for DOE's National Renewable Energy Laboratory (NREL) in Golden, Colorado. The cost-plus award-fee contract is

  7. DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its

    Energy Savers [EERE]

    Savannah River Site | Department of Energy Nuclear Solutions, LLC to Manage and Operate its Savannah River Site DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site January 10, 2007 - 10:24am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Savannah River Nuclear Solutions (SRNS), LLC has been selected as the management and operating contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The

  8. Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-29

    To establish policies and procedures for management of DOE, including NNSA, Management and Operating (M&O) and other facility management contractor employees assigned to the Washington, D.C., area. Cancels DOE O 350.2.

  9. DOE O 243.1B, Records Management Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O 243.1B, Records Management Program DOE O 243.1B, Records Management Program To set forth requirements and responsibilities for creating and preserving records containing adequate...

  10. Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM Order Module--DOE O 151.1C, COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM The familiar level of this module is designed to summarize...

  11. "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY FAMILIAR LEVEL

    Broader source: Energy.gov [DOE]

    "The familiar level of this module is divided into two sections. In the first section, we will discuss the additions to DOE M 450.4-1, Integrated Safety Management System Manual, which has been...

  12. DOE-STD-1165-2003; Aviation Manager Functional Area Qualification Standard

    Office of Environmental Management (EM)

    5-2003 September 2003 DOE STANDARD AVIATION MANAGER FUNCTIONAL AREA QUALIFICATION STANDARD DOE Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1165-2003 ii This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy,

  13. DOE-STD-1178-2004; Technical Program Manager Functional Area Qualification Standard

    Office of Environmental Management (EM)

    78-2004 February 2004 DOE STANDARD TECHNICAL PROGRAM MANAGER FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1178-2004 i This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S.

  14. Implementing Information Security and Its Technology: A LineManagement Perspective

    SciTech Connect (OSTI)

    Barletta, William A.

    2005-08-22

    Assuring the security and privacy of institutionalinformation assets is a complex task for the line manager responsible forinternational and multi-national transactions. In the face of an unsureand often conflicting international legal framework, the line managermust employ all available tools in an Integrated Security and PrivacyManagement framework that ranges from legal obligations, to policy, toprocedure, to cutting edge technology to counter the rapidly evolvingcyber threat to information assets and the physical systems thatinformation systems control.

  15. Safety Management Functions, Responsibilities, and Authorities Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-10-08

    This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Canceled by DOE M 411.1-1A. Does not cancel other directives.

  16. Safety Management Functions, Responsibilities, and Authorities Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-31

    This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Cancels DOE M 411.1-1B. Canceled by DOE O 450.2.

  17. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-03-27

    Establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Cancels DOE O 440.1.

  18. Acting Assistant Secretary for DOE Office of Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commemorates Completion of Major Recovery Act Project August 11, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171 Media visit...

  19. DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico.

  20. Quality Assurance Guide for Project Management - DOE Directives...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Quality Assurance Guide for Project Management by John Makepeace Functional areas: Project Management, Quality Assurance and Oversight This Guide provides acceptable approaches...

  1. DI-MGMT-81861 DOE Changes Version -- Integrated Program Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Program Management Report (IPMR) Data Item Description (DID) Earned Value Management System Interpretation Handbook (EVMSIH) Enhancing Earned Value (EV) Analysis Using ...

  2. 2014 DOE Project Management Workshop Meeting the Challenge-Integrated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Are We There Yet? Project Management Update Break Office of Management & Performance Perspective Ethics Lunch FAITAS & PMCDP Tuesday, 25 March-- General Session Topic Registration ...

  3. Resource Management Organization | U.S. DOE Office of Science...

    Office of Science (SC) Website

    for Science Programs, and ensures that financial management is applied using proper ... The Office of Grants and Contract Support manages and executes the financial actions that ...

  4. Enterprise Risk Management (ERM) Model - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enterprise Risk Management (ERM) Model by Website Administrator The Enterprise Risk Management Model is a new standardized framework that the Department will be using to develop,...

  5. DOE Handbook: Guide to good practices for training of technical staff and managers

    SciTech Connect (OSTI)

    1997-01-01

    Training programs at DOE facilities should prepare personnel to safely and efficiently operate the facilities in accordance with DOE requirements. This guide contains information that can be used to develop or validate training programs for technical staff and managers at DOE nuclear facilities. Training programs based on the content of this guide should provide assurance that these personnel perform their jobs safely and competently.

  6. NEW - DOE O 350.1 Chg 5, Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  7. Quality Assurance Management System Guide for Use with 10 CFR 830.120 and DOE O 414.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-17

    DOE Elements and DOE contractors should consult this Guide in order to develop and implement effective management systems that are consistent with the Department's quality expectations and that support the Safety Management System Policy, DOE P 450.4. Canceled by DOE G 414.1-2A. Does not cancel other directives.

  8. Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and

    Office of Environmental Management (EM)

    Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Preparation for Facility Operations Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 Table of Contents Objective ......................................................................................................................................... 4

  9. Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste

    Energy Savers [EERE]

    and Spent Nuclear Fuel | Department of Energy Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel The Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel report assesses the technical options for the safe and permanent disposal of high-level radioactive waste (HLW) and spent nuclear fuel (SNF) managed

  10. DOE-HDBK-3027-99; DOE Handbook Integrated Safety Management Systems (ISMS) Verification Team Leader's Handbook

    Office of Environmental Management (EM)

    27-99 June 1999 DOE HANDBOOK INTEGRATED SAFETY MANAGEMENT SYSTEMS (ISMS) VERIFICATION TEAM LEADER'S HANDBOOK U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S.

  11. Extension of DOE O 430.2, In-House Energy Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-12-13

    This Notice extends DOE O 430.2, IN-HOUSE ENERGY MANAGEMENT, dated 6-13-96 until 6-13-01, unless sooner rescinded. The Order is being revised to implement Executive Order 13123, Greening of the Government Through Efficient Energy Management, and a Secretarial Memorandum, Pollution Prevention and Energy Efficiency Leadership Goals, and to include the acquisition, planning and management of utilities. Does not cancel other directives.

  12. DOE - Office of Legacy Management -- Notice_LEHR_CERCLA_FiveYearReview

    Office of Legacy Management (LM)

    > Notice_LEHR_CERCLA_FiveYearReview Notice of LEHR CERCLA Five-Year Review The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is conducting the first Five-Year Review of the remedies for the environmental cleanup of the DOE areas of the former Laboratory for Energy-Related Health Research (LEHR) at the University of California, Davis, under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). DOE successfully completed removal actions at DOE

  13. DOE Selects ASE to Manage and Operate its National Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Related Articles Secretary of Energy Signs Memorandum of Understanding to Strengthen U.S.-Portugal Cooperation in Renewable Energy Technologies DOE to Pursue Zero-Net Energy ...

  14. DOE's New Checklist Helps Plants Assess Energy Management Activities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    they have already completed and identify missing elements needed to achieve SEP certification or ISO 50001. This information can help users access DOE technical resources...

  15. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    LBNL's primary DOE program sponsors are: Office of Science; Energy Efficiency and Renewable Energy; Fossil Energy; and Electricity Delivery and Energy Reliability. Last...

  16. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    and landlord of the Laboratory, while other parts of DOE, such as Energy Efficiency and Renewable Energy, Office of Electrical Distribution, the Office of Fossil Energy, and...

  17. DOE - Office of Legacy Management -- Westinghouse Advanced Reactors...

    Office of Legacy Management (LM)

    Decommissioning of the Westinghouse Nuclear Fuel Facility at Cheswick, PA, 2 Volumes; June 1984 PA.10-4 - Aerospace Corporation Letter; Young to Wallo (DOE); Subject: Status of ...

  18. Radiological Control - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    98-2008, Change Notice 1, Radiological Control by Diane Johnson The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities...

  19. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Contract Management Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 Contract Management Print Text Size: A A A FeedbackShare Page OSO has contract oversight responsibilities for two major prime contractors: one with UT Battelle, the management and operating contractor for ORNL, and the

  20. DOE Policy 141.1: Management of Cultural Resources (DOE, 2001...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to raise the level of awareness and accountability among DOE contractors concerning the importance of the Department's cultural resource-related legal and trust responsibilities. ...

  1. New - DOE G 436.1-1, Federal Sustainable Print Management - DOE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patricia Greeson The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental...

  2. DOE-STD-1075-94; DOE Standard Guide for Operational Configuration Management Program

    Office of Environmental Management (EM)

    5-94 July 1994 DOE STANDARD STANDARD FOR DEVELOPING AND ISSUING DOE SAFETY GUIDES AND IMPLEMENTATION GUIDES U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the

  3. ORISE: DOE recognizes partnership with ORAU for long-time management of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tennessee Science Bowl DOE recognizes partnership with ORAU for long-time management of Tennessee Science Bowl Annual competition has been managed by ORAU on behalf of DOE since 1991 FOR IMMEDIATE RELEASE Dec. 3, 2012 FY13-03 OAK RIDGE, Tenn.-U.S. Department of Energy ORNL Site Office Manager Johnny Moore recently presented a commemorative plaque to ORAU for its continued support of DOE's Tennessee Science Bowl, an annual competition aimed at encouraging high school students to excel in

  4. Microsoft Word - DOE-CBFO-01-3107 PDP Management Plan_rev 8_final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO-01-3107 PERFORMANCE DEMONSTRATION PROGRAM MANAGEMENT PLAN Revision 8 February 2016 U.S. Department of Energy Carlsbad Field Office TRU Sites and Transportation Division This document supersedes DOE/CBFO-01-3107, Revision 7. DOE/CBFO-01-3107 Revision 8 PDP Management Plan February 2016 2 Performance Demonstration Program Management Plan DOE/CBFO-01-3107 Revision 8 February 2016 Approved By: //signature on file// Date: 2/18/2016 Director CBFO TRU Sites and Transportation Division Concurred

  5. [6450-01-P], DEPARTMENT OF ENERGY, 10 CFR Part 830, Nuclear Safety Management, AGENCY: Department of Energy (DOE).

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is issuing a final rule regarding Nuclear SafetyManagement. This Part establishes requirements for the safe management of DOE contractor andsubcontractor work at the...

  6. DOE Announces 2008 Federal Energy and Water Management Awards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Awards October 22, 2008 - 4:14pm Addthis Awards for Energy Efficiency and Renewable Energy Save Taxpayers 28 Million in Energy Costs WASHINGTON - The Department of Energy (DOE)...

  7. DOE Seeks Office Spaces for its Idaho Environmental Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Suite 500 Cincinnati, OH 45227 For additional information contact Bud Sokolovich at: 513-246-0595, or: bud.sokolovich@emcbc.doe.gov Editorial Date May 29, 2009 By Danielle Miller...

  8. DOE - Office of Legacy Management -- University of Arizona Southwest...

    Office of Legacy Management (LM)

    of the University of Arizona under FUSRAP; October 13, 1987 AZ.01-4 - DOE Letter; Bauer to Liverman; Past Operations and a Survey by Messrs, Jascewsky, and Smith; February 7, 1978

  9. DOE - Office of Legacy Management -- Fort St Vrain - 011

    Office of Legacy Management (LM)

    is located in Weld County, Colorado. In 1965, the U.S. Atomic Energy (a predecessor agency to DOE) agreed to provide permanent storage for a large portion of the Fort St. ...

  10. DOE - Office of Legacy Management -- Tube Reducing Co - NJ 11

    Office of Legacy Management (LM)

    Fernald, Ohio; December 11, 1994, and Attachments NJ.11-4 - DOE Memorandum; DeLaney to Lynch; Subject: Commercial Facilities Used by National Lead Company of Ohio in Support of...

  11. DOE - Office of Legacy Management -- Los Alamos Underground Med...

    Office of Legacy Management (LM)

    Office Designated Name: Not Designated Alternate Name: Los Alamos County Industrial Waste Lines NM.02-1 Location: Los Alamos , New Mexico NM.02-1 Evaluation Year: 1986 NM.02-1...

  12. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Contract Management Princeton Site Office (PSO) PSO Home About Projects Contract Management NEPA Documents Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 Contract Management Print Text Size: A A A FeedbackShare Page The Princeton Site Office oversees the Princeton Plasma Physics Laboratory renown as a world-class fusion energy research laboratory dedicated to developing the scientific and technological

  13. Project Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Management Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email

  14. DOE - Office of Legacy Management -- MonValley

    Office of Legacy Management (LM)

    Arizona Monument Valley, Arizona, Processing Site UMTRCA Title I site monval_map The Monument Valley Processing Site, an Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site, is managed by the Office of Legacy Management. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Monument Valley site, view the fact sheet. Site History Site

  15. DOE-Energy 101: Energy Management Monthly Training | Open Energy...

    Open Energy Info (EERE)

    Energy 101: Energy Management Monthly Training Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy 101 Training AgencyCompany Organization: United States Department...

  16. DOE Announces Webinars on Real Time Energy Management, Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eastern Standard Time. This webinar will feature three Better Buildings Challenge partners that are employing real-time energy management to achieve their energy reduction goals. ...

  17. After Review, DOE Competitively Awards Contract For the Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract For the Management of Waste Isolation Pilot Plant Secretary of Energy Bill Richardson today announced that the Energy Department has awarded a 500 million, five-year...

  18. DOE - Office of Legacy Management -- Niagara Falls Storage Site...

    Office of Legacy Management (LM)

    of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. Assessment of Historical Knolls Atomic Power Laboratory Waste Storage...

  19. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Contract Management Fermi Site Office (FSO) FSO Home About Projects Contract Management NEPA Documents Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630) 840-3285 Contract Management Print Text Size: A A A FeedbackShare Page The FSO Business and Contract Support Team implements the timely execution of all Fermi Research Alliance management and operating contract modifications.

  20. Statement from DOE Assistant Secretary for Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with NAPA's Panel and staff as they reviewed EM's management organization and the policies and procedures that support the program. The NAPA review identified a number of...

  1. Tank Closure & Waste Management (DOE/EIS-0391) FINAL - Hanford...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Environmental NEPA - Environmental Impact Statements Tank Closure & Waste Management EIS 2012 Documents CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA -...

  2. Management Homepage | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Contact Information Management U.S. Department of Energy SC-48Germantown Building 1000 ... concerning these programs, please feel free to contact us. Last modified: 312016 ...

  3. MANAGEMENT ALERT: DOE/IG-0891 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notably, the Department initiated immediate corrective actions. TOPIC: Human Resource PDF icon Management Alert: IG-0891 More Documents & Publications Special Inquiry:...

  4. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    SSO reviews, approves and oversees business operations and administrative systems such as budget; financial management; accounting; internal and external audits; procurement ...

  5. DOE - Office of Legacy Management -- Riverton Mill Site - WY...

    Office of Legacy Management (LM)

    Control Act (UMTRCA) Title I Site April Gil, PhD Environment Team Lead Office of Legacy Management (LM) May 2, 20122 Status and Action Summary Surface Remediation ...

  6. DOE - Office of Legacy Management -- Shiprock Mill Site - NM...

    Office of Legacy Management (LM)

    ... Evaluation of the Trench 2 Groundwater Remediation System at the Shiprock, New Mexico, Legacy Management Site March 2009 Supplement to the Baseline Risk Assessment of Ground Water ...

  7. Notice of Intent to Revise DOE G 414.1-1B, Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18

    This memorandum provides justification for revising DOE G 414.1-1B, Management and Independent Assessments Guide for Use With 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A, Implementation of Department of Energy Oversight Policy.

  8. DOE-HDBK-1101-2004; Process Safety Management for Highly Hazardous Chemicals

    Office of Environmental Management (EM)

    HDBK-1101-2004 August 2004 Superseding DOE-HDBK-1101-96 February 1996 DOE HANDBOOK PROCESS SAFETY MANAGEMENT FOR HIGHLY HAZARDOUS CHEMICALS U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1101-2004 ii This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the ES&H Technical Information Services, U.S. Department of Energy, (800)

  9. Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT | Department of

    Energy Savers [EERE]

    Energy 0.1B, REAL PROPERTY ASSET MANAGEMENT Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT "The objective of DOE O 430.1B, Real Property Asset Management, is to establish a corporate, holistic, and performance-based approach to real property life-cycle asset management that links real property asset planning, programming, budgeting, and evaluation to program mission projections and performance outcomes. To accomplish the objective, this Order identifies requirements and

  10. Chapter 70 - DOE Management and Operating Contracts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    icon 70.7ch3ContractorHumanResourceManagement1.pdf ...h6PatentandDataRights1.pdf PDF icon 70.7ch7FinancialManagement1.pdf PDF icon 70.7ch8BusinessandContractMan...

  11. Assessment of Disposal Options for DOE-Managed High-Level Radioactive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for some DOE-managed HLW and SNF. The report recommends that the Department begin implementation of a phased, adaptive, and consent-based strategy with development of a...

  12. DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico.

  13. DOE to Compete Contract for Management and Operation of Pacific Northwest National Laboratory

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. -- The U.S. Department of Energy (DOE) announced today that it intends to seek competitive bids for the management and operations contract for the Pacific Northwest National...

  14. Proceedings of the DOE standards managers workshop, Gaithersburg, Maryland, October 26--28, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    On May 19, 1992, the Secretary of Energy signed the revised DOE Order 1300.2A, Department of Energy Technical Standards Program, which set the policy and assigned responsibility for activities within the program. The purpose of the revision to the order was to place greater emphasis on the use of technical standards for design, construction, testing, modification, operation, decommissioning, decontamination, and remediation of DOE`s facilities and activities. Within the context of this order, Standards Managers have been assigned for each DOE Secretarial office, each DOE Field Office, and each management and operating (M&O) contractor or site manager to be responsible for and provide the appropriate amount of emphasis on consistent use of standards at DOE facilities. Office of Management and Budget (OMB) Circular A-119 also stresses the importance of the use of standards within Government facilities and directs that activities first attempt to locate and adopt non-Government standards (NGSs) for DOE use. If an NGS is not complete enough for the intended application, it should be adopted for the activity and tailored for the need by development of a Government (DOE) standard. When these NGS documents are unavailable, DOE components will develop an appropriate Government standard to satisfy the need. This expanded DOE program will provide all the information necessary to adopt, tailor, or develop these standards and track the activities. A key to the proper implementation of technical standards and governing requirements is establishing a culture of knowledge and commitment. The workshop provided an in-depth orientation on the Technical Standards Program to participating DOE and M&O Standards Managers.

  15. DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report

    National Nuclear Security Administration (NNSA)

    Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to the U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 Telephone: (865) 576-8401 Fax: (865) 576-5728 E-mail: reports@adonis.osti.gov DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report Area 3 and

  16. DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report

    National Nuclear Security Administration (NNSA)

    Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to the U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 Telephone: (865) 576-8401 Fax: (865) 576-5728 E-mail: reports@adonis.osti.gov DOE/NV/11718--1241 DOE/NV/25946--021 Nevada Test Site 2005 Waste Management Monitoring Report Area 3 and

  17. DOE P 141.1 – Department of Energy Management of Cultural Resources

    Broader source: Energy.gov [DOE]

    The purpose of this Policy is (1) to ensure that U.S. Department of Energy (DOE) programs, including the National Nuclear Security Administration (NNSA), and field elements integrate cultural resources management into their missions and activities, and (2) to raise the level of awareness and accountability among DOE (including NNSA) contractors concerning the importance of DOE's cultural resource-related legal and trust responsibilities.

  18. DOE-STD-4001-2000; Design Criteria Standard for Electronic Records Management Software Applications

    Office of Environmental Management (EM)

    4001-2000 March 2000 DOE STANDARD DESIGN CRITERIA STANDARD FOR ELECTRONIC RECORDS MANAGEMENT SOFTWARE APPLICATIONS U.S. Department of Energy AREA INFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public

  19. DRAFT - DOE O 350.2C, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order establishes policies and procedures for managing DOE and NNSA management and operating (M&O) contractors and other facility management contractor employees assigned to the Washington, D.C., area.

  20. DOE Announces Webinars on Kick-Starting an Energy Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Energy Department will present a live webinar titled "Kick-Starting Your Energy Management Program" on Tuesday, January 7, from 3:00 p.m. to 4:00 p.m. Eastern Standard Time. ...

  1. DOE ZERH Webinar: Quality Management Systems for ZERH

    Broader source: Energy.gov [DOE]

    Description:The session will provide background and guidance for how Zero Energy Ready Home builders can integrate a quality management program in their business. The focus will be on facilitating...

  2. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us Contract Management Print Text Size: A...

  3. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 Contract Management Print Text Size: A A A FeedbackShare Page Partnership...

  4. Contract Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 Contract Management Print Text Size: A A A FeedbackShare Page FY 2012 SC...

  5. NEW- DOE O 325.2, Position Management and Classification

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order establishes departmental requirements and responsibilities for classifying positions using general schedule (GS) and federal wage system (FWS) standards and for developing and administering a sound position management and classification program within the Department.

  6. DOE - Office of Legacy Management -- SLC_P

    Office of Legacy Management (LM)

    Compliance Action Plan for the Salt Lake City, Utah UMTRA Project Site Long-Term Management Plan for the Salt Lake City, Utah, (UMTRCA Title I) Processing Site Notice of...

  7. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Establishes the framework for an effective worker protection program that will reduce or prevent accidental losses, injuries, and illnesses by providing DOE Federal and contractor workers with a safe and healthful workplace. Chg 1, 10-26-95; Chg 2, 10-26-96.

  8. DOE - Office of Legacy Management -- Paducah Gaseous Diffusion Plant - KY

    Office of Legacy Management (LM)

    01 Paducah Gaseous Diffusion Plant - KY 01 FUSRAP Considered Sites Site: Paducah Gaseous Diffusion Plant (KY.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.oakridge.doe.gov/factsheets/paducgdp.htm Documents Related to Paducah Gaseous Diffusion Plant

  9. DOE - Office of Legacy Management -- West Valley Demonstration Project - NY

    Office of Legacy Management (LM)

    23 Valley Demonstration Project - NY 23 FUSRAP Considered Sites Site: West Valley Demonstration Project (NY.23) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/westvalleydemoproject.aspx Documents Related to West Valley Demonstration Project

  10. federal energy management prog | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Energy Management Program The U.S. Department of Energy's Federal Energy Management Program (FEMP) plays a critical role in reducing energy use and increasing the use of renewable energy at Federal agencies. The U.S. Federal government is the nation's largest energy user, and it has both a tremendous opportunity and an acknowledged responsibility to lead by example in saving energy. Thanks in part to the technical assistance provided by FEMP, the energy intensity of Federal facilities

  11. Reservation Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Reservation Management Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Don F. Thress, Jr. U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-4444 Services Reservation Management Print Text Size: A A A FeedbackShare Page Related Links Emergency

  12. Information Management | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Management Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Don F. Thress, Jr. U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-4444 Services Information Management Print Text Size: A A A FeedbackShare Page Integrated Support Center

  13. Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-18

    The Order establishes policies and procedures for managing DOE and NNSA management and operating (M&O) contractors and other facility management contractor employees assigned to the Washington, D.C., area.

  14. Seventh annual DOE LLWMP participants' information meeting. DOE Low-Level Waste Management Program. Abstracts

    SciTech Connect (OSTI)

    Not Available

    1985-08-01

    The following sessions were held: International Low-Level Waste Management Activities; Low-Level Waste Disposal; Characteristics and Treatment of Low-Level Waste; Environmental Monitoring and Performance; Greater Confinement and Alternative Disposal Methods; Low-Level Waste Management; Corrective Measures; Performance Prediction and Assessment; and Siting New Defense and Commercial Low-Level Waste Disposal Facilities.

  15. Appendix B: Rules and Directives Applicable to Nuclear Facilities Line

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Oversight | Department of Energy Appendix B: Rules and Directives Applicable to Nuclear Facilities Line Management Oversight Appendix B: Rules and Directives Applicable to Nuclear Facilities Line Management Oversight Appendix B to DOE G 226.1-2A "Federal Line Management Oversight of Department of Energy Nuclear Facilities". Consists of a list of rules and directives that are applicable to nuclear facilities line management oversight. PDF icon Appendix B: Rules and

  16. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Energy Savers [EERE]

    its Ames Laboratory | Department of Energy Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory June 29, 2006 - 2:48pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames Laboratory, a DOE Office of Science (SC) research facility in Ames, Iowa. This competition for a contractor is the

  17. DOE-STD-1098-2008

    Broader source: Energy.gov [DOE]

    Radiological Control Replaced by DOE-STD-1098-2008 The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities for implementing occupational radiological control programs.

  18. Extension of DOE O 430.2, In-House Energy Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-13

    The Order is in the process of being revised to implement E.O. 13123, Greening of the Government Through Efficient Energy Management, and a Secretarial Memorandum, Pollution Prevention and Energy Efficiency Leadership Goals. The revision will also include the acquisition, planning and management of utilities. Does not cancel other directives.

  19. DOE - Office of Legacy Management -- Mound Laboratory - OH 19

    Office of Legacy Management (LM)

    Mound Laboratory - OH 19 FUSRAP Considered Sites Site: Mound Laboratory (OH.19) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Mound, Ohio, Site Documents Related to Mound Laboratory Workshop presentations emphasized the challenges of reindustrializing former DOE sites and the importance of involving local government and the community

  20. DOE - Office of Legacy Management -- Pinellas Plant General Electric Co -

    Office of Legacy Management (LM)

    FL 07 Pinellas Plant General Electric Co - FL 07 FUSRAP Considered Sites Site: Pinellas Plant General Electric Co. (FL.07) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Pinellas, Florida, Site Documents Related to Pinellas Plant General Electric Co. Building 100 Area Corrective Measures Study Report Addendum; DOE-LM/GJ1241-2006;

  1. DOE - Office of Legacy Management -- Project Gnome Site - NM 12

    Office of Legacy Management (LM)

    Gnome Site - NM 12 FUSRAP Considered Sites Site: Project Gnome Site (NM.12) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gnome-Coach, New Mexico, Site Documents Related to Project Gnome Site Conditional Certificate of Completion. Attached letter from New Mexico Environment Department of DOE dated September 25, 2014. Fact Sheet

  2. DOE - Office of Legacy Management -- Raritan Arsenal - NJ 32

    Office of Legacy Management (LM)

    Raritan Arsenal - NJ 32 Site ID (CSD Index Number): NJ.32 Site Name: RARITAN ARSENAL Site Summary: Site Link: External Site Link: Alternate Name(s): None Alternate Name Documents: Location: Metuchen , New Jersey Location Documents: NJ.32-1 Historical Operations (describe contaminants): Munitions storage site; no indication of DOE predecessor involvement. Historical Operations Documents: NJ.32-1 Eligibility Determination: Eliminated - No Authority Eligibility Determination Documents: NJ.32-2

  3. DOE - Office of Legacy Management -- Website Still Under Construction

    Office of Legacy Management (LM)

    Website Still Under Construction LMBC_tractor Website Under Construction This website is still under construction. Please forgive any temporary interruptions you experience. All comments are welcome To reach the main site visit http://stage.lm.doe.gov/home.aspx This corresponds to Goal 2 of LM's Goals -- Preserve, protect, and make accessible legacy records and information. Click here to view all of LM's Goals and Performance Measures Last Updated: 5/5/2009

  4. DOE - Office of Legacy Management -- BurrisPark_FUSRAP

    Office of Legacy Management (LM)

    California Burris Park, California, Site FUSRAP Site BurrisPark Background- The Burris Park, California, Site is located in Kings County, California, in the Central Valley south of Fresno. The site was remediated by the University of California-Davis and DOE has assumed long-term care responsibilities under the Formerly Utilized Site Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S.

  5. DOE - Office of Legacy Management -- Toledo_FUSRAP

    Office of Legacy Management (LM)

    Ohio Toledo, Ohio, Site FUSRAP Site Toledo Map Background-The Toledo, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-During the early and mid-1940s, Baker Brothers, Inc., fabricated slugs from natural uranium metal for the Manhattan Engineer District. In 1992, DOE designated the

  6. DOE - Office of Legacy Management -- Niagara Falls Vicinity Properties NY -

    Office of Legacy Management (LM)

    NY 17 Niagara Falls Vicinity Properties NY - NY 17 FUSRAP Considered Sites Niagara Falls Vicinity Properties, NY Alternate Name(s): Lake Ontario Ordnance Works (LOOW) Niagara Falls Storage Site (NFSS) DOE-Niagara Falls Storage Site NY.17-1 NY.17-3 Location: Lewiston , New York NY.17-5 Historical Operations: Stored, shipped, and buried radioactive equipment and waste for MED and AEC containing uranium, radium, and thorium. Portions of the former site are privately owned, creating a

  7. Quality Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Quality Management Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Don F. Thress, Jr. U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-4444 Services Quality Management Print Text Size: A A A FeedbackShare Page The ISC provides quality assurance

  8. Microsoft Word - 2010O-03 DOE-RL Manager.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-RL Manager Recommendations 2010O-03 Adopted June 4, 2010 Page 1 June 4, 2010 Inés Triay Assistant Secretary for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Re: Department of Energy Richland Operations Manager Recommendations Dear Ms Triay, Thank you for encouraging the Hanford Advisory Board (Board) and me to provide recommendations regarding the selection of the next U.S. Department of Energy (DOE) Richland

  9. NEW - DOE G 430.1-8, Asset Revitalization Guide for Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Pursuant to the objectives of the Order, the Asset Revitalization (AR) Guide for Asset Management and Reuse (AR Guide) was developed to assist DOE and NNSA sites and program offices offer unneeded assets with remaining capacity to the public or other government agencies. DOE continually refines strategies and tools, enabling it to share unique assets, including land, facilities, infrastructure, equipment, and technologies with the public. Real property planning, acquisition, sustainment, and disposal decisions are balanced to accomplish DOEs mission; reduce risks to workers, the public, and the environment; and minimize lifecycle costs.

  10. DOE-HDBk-1139/1-2000; Chemical Management Volume 1 of 3

    Office of Environmental Management (EM)

    NOT MEASUREMENT SENSITIVE DOE-HDBK-1139/1-2000 November 2000 CHANGE NOTICE NO. 1 September 2004 DOE HANDBOOK CHEMICAL MANAGEMENT (Volume 1 of 3) U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Available on the Department of Energy Technical Standards Program Web site at http://www.eh.doe.gov/techstds DOE-HDBK-1139/1-2000 Change Notice No. 1 iii Page / Section Change p. iv / Table of Contents Added

  11. Chapter 70 - DOE Management and Operating Contracts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...actorHumanResourceManagement1.pdf PDF icon 70.7ch4Security1.pdf PDF icon 70.7ch5PerformanceMeasurementandAssessment1.pdf PDF icon 70.7ch6PatentandDataRights1.pdf ...

  12. DOE - Office of Legacy Management -- Staten Island Warehouse - NY 22

    Office of Legacy Management (LM)

    Staten Island Warehouse - NY 22 FUSRAP Considered Sites Staten Island Warehouse, NY Alternate Name(s): Archer-Daniels Midland Company NY.22-3 Location: 2393 Richmond Terrace, Port Richmond, New York NY.22-2 Historical Operations: Stored pitchblende (high-grade uranium ore), which was purchased by the MED for the first atomic bomb. NY.22-3 Eligibility Determination: Eligible Radiological Survey(s): Assessment Survey NY.22-5 Site Status: Referred by DOE, evaluation in progess by U.S. Army Corps of

  13. DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program

    Office of Environmental Management (EM)

    II-A-1 DOE-STD-1073-93 APPENDIX lI-A DESIGN CONTROL Design controls are the measures established to assure that the design process activities are carried out in a planned, orderly, correct, and documented manner. These controls assure the quality of the design requirements and design basis obtained through the design process. Design controls are constraints to the design process that ensure the following results: the correct identification of design inputs and constraints; the design analysis

  14. DOE-STD-1073-93-Pt. 1; DOE Standard Guide for Operational Configuration Management Program

    Office of Environmental Management (EM)

    61 CHAPTER 3 IMPLEMENTATION GUIDANCE FOR DESIGN RECONSTITUTION This guidance is appropriate for high-hazard facilities expected to operate for an extended period. Since DOE facilities vary in hazard level and circumstances of operation, a graded approach to implementation should be adopted. The implementation guidance is presented in the general sequence in which the design reconstitution (DR) adjunct program is expected to be developed and implemented. Figure 3-1 presents the top- level

  15. Twelfth annual US DOE low-level waste management conference

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The papers in this document comprise the proceedings of the Department of Energy's Twelfth Annual Low-Level Radioactive Waste Management Conference, which was held in Chicago, Illinois, on August 28 and 29, 1990. General subjects addressed during the conference included: mixed waste, low-level radioactive waste tracking and transportation, public involvement, performance assessment, waste stabilization, financial assurance, waste minimization, licensing and environmental documentation, below-regulatory-concern waste, low-level radioactive waste temporary storage, current challenges, and challenges beyond 1990.

  16. DOE model conference on waste management and environmental restoration

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  17. DOE - Office of Legacy Management -- Nuclear Metals Inc - MA 09

    Office of Legacy Management (LM)

    Metals Inc - MA 09 FUSRAP Considered Sites Site: NUCLEAR METALS, INC. (MA.09) Eliminated from consideration under FUSRAP - Licensed facility - included in NRC action plan (Site Decommissioning Management Plan) in 1990 for cleanup Designated Name: Not Designated Alternate Name: None Location: 1555 Massachusetts Ave. , Cambridge , Massachusetts MA.09-2 Evaluation Year: 1987 MA.09-1 Site Operations: Produced natural uranium tubes for Savannah River reactor program and fabricated power reactor fuel

  18. DOE - Office of Legacy Management -- Stanford Linear Accelerator Center -

    Office of Legacy Management (LM)

    005 Stanford Linear Accelerator Center - 005 FUSRAP Considered Sites Site: Stanford Linear Accelerator Center (005) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Stanford Linear Accelerator Center was established in 1962 as a research facility for high energy particle physics. The Environmental Management mission at this site is to

  19. DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents

    Office of Legacy Management (LM)

    Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011)

  20. DOE/EIS-0251; Supplemental Analysis For a Container System for the Management of DOE Spent Nuclear Fuel Located at the INEEL

    Office of Environmental Management (EM)

    ID-10636 SUPPLEMENT ANALYSIS FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF DOE SPENT NUCLEAR FUEL LOCATED AT THE INEEL March 1999 U.S. Department of Energy Idaho Operations Office Idaho Falls, Idaho DOE/ID-10636 SUPPLEMENT ANALYSIS FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF DOE SPENT NUCLEAR FUEL LOCATED AT THE INEEL March 1999 Department of Energy Idaho Operations Office Idaho Falls, Idaho SNF Supplement Analysis ii March 1999 CONTENTS Acronyms and Abbreviations

  1. Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

  2. Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-20

    The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

  3. Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-31

    To establish policies and procedures for management of Department of Energy (DOE), including National Nuclear Security Administration (NNSA), management and operating (M&O) and other facility management contractor employees assigned to the Washington, D.C. area. Supersedes DOE O 350.2A

  4. DOE OFFICE OF ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW

    Broader source: Energy.gov (indexed) [DOE]

    ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW "I am proud of all of the work we in EM-both at headquarters and in the field-have accomplished this year. While facing the most complex cleanup challenges, measurable progress was made in 2015-a testament to our skilled workforce. The considerable investment made in cleanup this year has led to strong results across the EM complex. The foundation and planning put in place this year will enable EM to hit the ground running in 2016. I was honored

  5. DOE-HDBK-1101-96; Process Safety Management for Highly Hazardous Chemicals

    Office of Environmental Management (EM)

    01-96 February 1996 TS DOE HANDBOOK PROCESS SAFETY MANAGEMENT FOR HIGHLY HAZARDOUS CHEMICALS U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department

  6. DOE Announces Nearly $3.2 Million to Help Consumers Better Manage Their

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Consumption | Department of Energy Announces Nearly $3.2 Million to Help Consumers Better Manage Their Energy Consumption DOE Announces Nearly $3.2 Million to Help Consumers Better Manage Their Energy Consumption May 22, 2012 - 2:12pm Addthis Smart Grid Data Access Awards Will Demonstrate How Consumers and Communities Can Benefit from Better Energy Information The Department of Energy announced phase I awards totaling nearly $3.2 million that will encourage utilities, local

  7. Performance measures for evaluating public participation activities in DOE`s Office of Environmental Management

    SciTech Connect (OSTI)

    Carnes, S.A.; Schweitzer, M.; Peelle, E.B.; Wolfe, A.K.; Munro, J.F.

    1996-08-01

    Public participation in decision-making in the United States has become a dominant theme throughout the public sector and is increasingly used in the private sector. Recent reports by the National Research Council and the Commission on Risk Assessment and Risk Management, set up jointly by the White House and Congress, conclude that risk decisions must increasingly be structured in such a manner as to involve stakeholders meaningfully in the processes and activities leading to decisions and, perhaps, through decision implementation. Both of these reports indicate that decisions may take longer but be better if officials: (1) bring all interested and affected parties to the table at the beginning of the risk-discussion process; (2) identify relevant concerns, losses, exposures and other information the parties have; (3) address significant concerns through appropriate research; and (4) present findings in an understandable, accessible way. This report is intended to facilitate subsequent evaluations of public participation activities and programs.

  8. Statement from DOE Assistant Secretary for Environmental Management James Rispoli on the National Academy of Public Administration's Management Review of DOE's Office of Environmental Management

    Broader source: Energy.gov [DOE]

    "Today the National Academy of Public Administration released their comprehensive management review of the Department of Energy's Office of Environmental Management (EM).  EM is a $5.6 billion per...

  9. Earned Value Management System (EVMS) for use with DOE O 413.3B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-29

    DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, (the Order) was revised November 29, 2010. As a result, the companion 413.3 Series Guides must be revised to align with the requirements delineated in the Order.

  10. Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23

    This Guide provides the Department of Energy's federal project directors with the methodologies and tools needed to plan, implement and complete assigned projects using a Systems Engineering approach in accordance with the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. No cancellations.

  11. Leaders of DOE Environmental Management Advisory Group to Meet in Henderson

    Broader source: Energy.gov [DOE]

    The Chairs and Vice-Chairs of the U.S. Department of Energy’s (DOE) Environmental Management (EM) Site-Specific Advisory Board (SSAB) will meet in Henderson, NV, April 13-14, at Green Valley Ranch located at 2300 Paseo Verde Parkway.

  12. Leaders of DOE Environmental Management Advisory Group to Meet in North Las Vegas

    Broader source: Energy.gov [DOE]

    Nevada Site Office News - The Chairs and Vice-Chairs of the U.S. Department of Energys (DOE) Environmental Management (EM) Site-Specific Advisory Board (SSAB) will meet in North Las Vegas, Nevada, June 15-16, at Aliante Station Hotel located at 7300 Aliante Parkway.

  13. NEW - DOE O 325.2 Chg 1 (Admin Chg), Position Management and Classification

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order establishes departmental requirements and responsibilities for classifying positions using the general schedule (GS) and federal wage system (FWS) standards and to develop and administer a sound position management and classification program. Cancels DOE O 325.2, dated 4-1-15.

  14. Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-29

    The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Supersedes DOE G 450.4-1B and DOE G 450.3-3.

  15. Appendices of DOE G 226.1-2A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices of DOE G 226.1-2A Appendices of DOE G 226.1-2A Below are the appendices to DOE G 226.1-2A Federal Line Management Oversight of Department of Energy Nuclear Facilities....

  16. Worker Safety and Health Program (10 CFR 851/DOE 0440.1B) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Health Program (10 CFR 851DOE 0440.1B) Worker Safety and Health Program (10 CFR 851DOE 0440.1B) The DOE Safety and Health Program supports line management and...

  17. Request to Cancel Department of Energy (DOE) Order, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area, dated May 31, 2011

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions.

  18. Request to Cancel Department of Energy (DOE) Order 350.2B, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-23

    DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions.

  19. Supplemental Requirements for the Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-19

    The Notice supplements review and approval requirements of DOE O 350.2A, Use of Management and Operating (M&O) or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area, dated 10-29-03.

  20. SHARING AND DEPLOYING INNOVATIVE INFORMATION TECHNOLOGY SOLUTIONS TO MANAGE WASTE ACROSS THE DOE COMPLEX

    SciTech Connect (OSTI)

    Crolley, R.; Thompson, M.

    2011-01-31

    There has been a need for a faster and cheaper deployment model for information technology (IT) solutions to address waste management needs at US Department of Energy (DOE) complex sites for years. Budget constraints, challenges in deploying new technologies, frequent travel, and increased job demands for existing employees have prevented IT organizations from staying abreast of new technologies or deploying them quickly. Despite such challenges, IT organizations have added significant value to waste management handling through better worker safety, tracking, characterization, and disposition at DOE complex sites. Systems developed for site-specific missions have broad applicability to waste management challenges and in many cases have been expanded to meet other waste missions. Radio frequency identification (RFID) and global positioning satellite (GPS)-enabled solutions have reduced the risk of radiation exposure and safety risks. New web-based and mobile applications have enabled precision characterization and control of nuclear materials. These solutions have also improved operational efficiencies and shortened schedules, reduced cost, and improved regulatory compliance. Collaboration between US Department of Energy (DOE) complex sites is improving time to delivery and cost efficiencies for waste management missions with new information technologies (IT) such as wireless computing, global positioning satellite (GPS), and radio frequency identification (RFID). Integrated solutions developed at separate DOE complex sites by new technology Centers of Excellence (CoE) have increased material control and accountability, worker safety, and environmental sustainability. CoEs offer other DOE sister sites significant cost and time savings by leveraging their technology expertise in project scoping, implementation, and ongoing operations.

  1. Line Environment, Safety and Health Oversight

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-06-26

    Sets forth the Department's expectations line management environment, safety and health (ES&H) oversight and for the use of contractor self-assessment programs as the cornerstone for this oversight. Canceled by DOE O 226.1.

  2. Worker Protection Management for DOE Federal and Contractor Employees Guide for use with DOE O 440.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-07-10

    This implementation guide provides general information and methodologies that DOE finds acceptable in meeting the Department's requirements defined in DOE O 440.1.

  3. DOE Announces Webinars on Kick-Starting an Energy Management Program,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Incubator Projects, and More | Department of Energy Kick-Starting an Energy Management Program, SunShot Incubator Projects, and More DOE Announces Webinars on Kick-Starting an Energy Management Program, SunShot Incubator Projects, and More December 20, 2013 - 8:58am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however,

  4. 17.6 - Origin, Characteristics, and Significance of the DOE's Management and Operating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 17.6 (October 2007) 1 DISCUSSION OF THE ORIGIN, CHARACTERISTICS, AND SIGNIFICANCE OF THE DEPARTMENT OF ENERGY's MANAGEMENT AND OPERATING (M&O) FORM OF CONTRACT INTRODUCTION. "Management and operating" (M&O) contract is a term used to describe the contracts that are central to the Department of Energy's (DOE's) business model. The term was adopted formally in a memorandum from the Secretary of Energy, dated October 5, 1983. 1 However, these contracts predate the

  5. DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel

    Office of Environmental Management (EM)

    Assessment of Disposal Options for DOE-Managed High-Level Radioactive Waste and Spent Nuclear Fuel October 2014 [This page left blank.] FOREWORD In January 2012, the final report of the Blue Ribbon Commission on America's Nuclear Future urged the Administration to conduct a review of the current policy to dispose of defense and commercial high level radioactive waste and spent nuclear fuel in a single repository or repositories. Based on that recommendation, in January 2013, the Administration's

  6. DOE G 226.1-1 Federal Line Management Oversight of Department...

    Office of Environmental Management (EM)

    issuance of the Order (due by 4-21-2011)) 6. Issues identified during previous reviews (e.g. CDNS Biennial Reviews, HSS reviews, self- assessments) have been appropriately...

  7. Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18

    Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A

  8. Developing Effective Continuous On-Line Monitoring Technologies to Manage Service Degradation of Nuclear Power Plants

    SciTech Connect (OSTI)

    Meyer, Ryan M.; Ramuhalli, Pradeep; Bond, Leonard J.; Cumblidge, Stephen E.

    2011-09-30

    Recently, there has been increased interest in using prognostics (i.e, remaining useful life (RUL) prediction) for managing and mitigating aging effects in service-degraded passive nuclear power reactor components. A vital part of this philosophy is the development of tools for detecting and monitoring service-induced degradation. Experience with in-service degradation has shown that rapidly-growing cracks, including several varieties of stress corrosion cracks (SCCs), can grow through a pipe in less than one fuel outage cycle after they initiate. Periodic inspection has limited effectiveness at detecting and managing such degradation requiring a more versatile monitoring philosophy. Acoustic emission testing (AET) and guided wave ultrasonic testing (GUT) are related technologies with potential for on-line monitoring applications. However, harsh operating conditions within NPPs inhibit the widespread implementation of both technologies. For AET, another hurdle is the attenuation of passive degradation signals as they travel though large components, relegating AET to targeted applications. GUT is further hindered by the complexity of GUT signatures limiting its application to the inspection of simple components. The development of sensors that are robust and inexpensive is key to expanding the use of AET and GUT for degradation monitoring in NPPs and improving overall effectiveness. Meanwhile, the effectiveness of AET and GUT in NPPs can be enhanced through thoughtful application of tandem AET-GUT techniques.

  9. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy PLEASE KEEP THIS PAHPHLET WITH YOU DURING YOUR VISIT Welcome to the Hanford Site Visitor Orientation 2 We take safety, security, and environmental protection seriously The safety and health of our employ- ees, the public, and those who visit the Hanford Site, in addition to site security and protection of the envi- ronment, are fundamental values of the U.S. Department of Energy (DOE) and its contractors. We strive to achieve and sustain a worksite that is free of

  10. DOE-HDBK-1139/3-2003; Chemical Management (Volume 3 of 3) Consolidated Chemical User Safety and Health Requirements

    Office of Environmental Management (EM)

    TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1139/3-2003 DOE HANDBOOK CHEMICAL MANAGEMENT (Volume 3 of 3) Consolidated Chemical User Safety and Health Requirements U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. September 2003 DOE-HDBK-1139/3-2003 This document has been reproduced directly from the best available copy. It is available to DOE and DOE contractors from ES&H Technical Information Services, U.S.

  11. DOE-HDBK-1203-97; Guide to Good Practices for Training of Technical Staff and Managers

    Office of Environmental Management (EM)

    MEASUREMENT SENSITIVE DOE-HDBK-1203-97 January 1997 Supersedes DOE-STD-1008-92 July 1992 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR TRAINING OF TECHNICAL STAFF AND MANAGERS U.S. Department of Energy FSC 6910 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak

  12. Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS | Department of Energy

    Energy Savers [EERE]

    Order 422.1, CONDUCT OF OPERATIONS Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS The general approach to implementing DOE O 422.1 is for contractors to develop, for DOE line management approval, documentation demonstrating implementation of the requirements in the contractor requirements document (CRD). DOE line management means the Federal officials such as Secretarial Officers and heads of field elements responsible for DOE facilities and operations. It is necessary to provide a conduct

  13. DOE Employment - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management DOE Employment About Us DOE Human Resources Management Division DOE Employment Recognition and Awards Program Federal Employees Union (AFGE Local 788) Work Schedules ...

  14. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics...

  15. DOE TechLine

    Broader source: Energy.gov (indexed) [DOE]

    share: 200,000; Duration: 12 months) Massachusetts Institute of Technology (Cambridge, Mass.)- Coal-CO 2 Slurry Feeding System for Pressurized Gasifiers. This project...

  16. Deputy Director for Resource Management Homepage | U.S. DOE Office...

    Office of Science (SC) Website

    These areas include program direction and analysis management; financial management; corporate business management; management analyses; acquisition and financial assistance ...

  17. Notice of Intent to Revise DOE O 331.1C, Chg 3, Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The revision incorporates recommendations from the FY12 National Council on Federal Labor-Management Relation's "Goals-Engagement-Accountability-Results (GEAR)" report and program requirements currently contained in the DOE Supervisory/Non-Supervisory Employee Performance Management and Recognition Desk Reference (Desk Reference) such as the DOE Monetary Awards Scale, as well as program requirements that have been established via memoranda since the Order was revised in October 2010.

  18. Notice of Intent to Revise DOE O 331.1C Chg 3, Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-20

    The revision incorporates recommendations from the FY12 National Council on Federal Labor-Management Relation's "Goals-Engagement-Accountability-Results (GEAR)" report and program requirements currently contained in the DOE Supervisory/Non-Supervisory Employee Performance Management and Recognition Desk Reference (Desk Reference) such as the DOE Monetary Awards Scale, as well as program requirements that have been established via memoranda since the Order was revised in October 2010.

  19. Jack R. Craig, Jr. is the new Manager of the U.S. Department of Energy (DOE) Sav

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jack R. Craig, Jr. is the new Manager of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) at the Savannah River Site (SRS) in Aiken, South Carolina, effective June 2015. Mr. Craig has served over 25 years in various technical, management and executive leadership positions both at DOE-Headquarters and field offices. Many of these positions have been associated with environmental cleanup activities at former nuclear weapons production facilities throughout the U.S.,

  20. Performance Measures for Evaluating Public Participation Activities in the Office of Environmental Management (DOE)

    SciTech Connect (OSTI)

    Carnes, S.A.

    2001-02-15

    Public participation in Office of Environmental Management (EM) activities throughout the DOE complex is a critical component of the overall success of remediation and waste management efforts. The challenges facing EM and its stakeholders over the next decade or more are daunting (Nuclear Waste News 1996). Achieving a mission composed of such challenges will require innovation, dedication, and a significant degree of good will among all stakeholders. EM's efforts to date, including obtaining and using inputs offered by EM stakeholders, have been notable. Public participation specialists have accepted and met challenges and have consistently tried to improve their performance. They have reported their experiences both formally and informally (e.g., at professional conferences and EM Public Participation Network Workshops, other internal meetings of DOE and contractor public participation specialists, and one-on-one consultations) in order to advance the state of their practice. Our research, and our field research in particular (including our interactions with many representatives of numerous stakeholder groups at nine DOE sites with diverse EM problems), have shown that it, is possible to develop coherent results even in a problem domain as complex as that of EM. We conclude that performance-based evaluations of public participation appear possible, and we have recommended an approach, based on combined and integrated multi-stakeholder views on the attributes of successful public participation and associated performance indicators, that seems workable and should be acceptable to diverse stakeholders. Of course, as an untested recommendation, our approach needs the validation that can only be achieved by application (perhaps at a few DOE sites with ongoing EM activities). Such an application would serve to refine the proposed approach in terms of its clarity, its workability, and its potential for full-scale use by EM and, potentially, other government agencies and private sector concerns.

  1. 1,200 To Attend DOE Safety Workshop- Integrated Safety Management (ISM) Workshop Features Nationally Renowned Speakers

    Broader source: Energy.gov [DOE]

    KENNEWICK, WASH. — The Department of Energy (DOE) offices at Hanford will host the 2011 Integrated Safety Management (ISM) Champions Workshop at the Three Rivers Convention Center in Kennewick for DOE and contractor employees from sites across the country on September 12-15.

  2. DOE-STD-1098-2008

    Broader source: Energy.gov [DOE]

    Radiological Control Change Notice 1 May 2009 The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities for implementing occupational radiological control programs.

  3. DOE Office of Environmental Management 2015 Year in Review | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy DOE Office of Environmental Management 2015 Year in Review Version Available for Download "I am proud of all of the work we in EM-both at headquarters and in the field-have accomplished this year. While facing the most complex cleanup challenges, measurable progress was made in 2015-a testament to our skilled workforce. The considerable investment made in cleanup this year has led to strong results across the EM complex. The foundation and planning put in place this year will

  4. Measuring the accomplishments of public participation programs: Overview of a methodological study performed for DOE`s Office of Environmental Management

    SciTech Connect (OSTI)

    Schweitzer, M.; Carnes, S.A.; Peelle, E.B.; Wolfe, A.K.

    1997-06-01

    Recently, staff at Oak Ridge National Laboratory performed a study for the Office of Intergovernmental and Public Accountability within the U.S. Department of Energy`s (DOE) Office of Environmental Management (EM), examining how to measure the success of public participation programs. While the study began with a thorough literature review, the primary emphasis of this research effort was on getting key stakeholders to help identify attributes of successful public participation in EM activities and to suggest how those attributes might be measured. Interviews were conducted at nine DOE sites that provided substantial variety in terms of geographic location, types of environmental management activities undertaken, the current life-cycle stage of those EM efforts, and the public participation mechanisms utilized. Approximately 12 to 15 oral interviews were conducted at each site, and each respondent also was asked to complete a written survey. Those interviewed included: non-regulatory state and local government officials; project managers and public participation staff for DOE and its management and operations contractors; non-government groups concerned with environmental protection, public safety, and health issues; federal and state environmental regulators; business organizations; civic groups; and other interested parties. While this study examined only those public participation programs sponsored by DOE, the resulting findings also have applicability to the public involvement efforts sponsored by many other public and private sector organizations.

  5. Prospects for pyrolysis technologies in managing municipal, industrial, and DOE cleanup wastes

    SciTech Connect (OSTI)

    Reaven, S.J.

    1994-12-01

    Pyrolysis converts portions of municipal solid wastes, hazardous wastes, and special wastes such as tires, medical wastes, and even old landfills into solid carbon and a liquid or gaseous hydrocarbon stream. Pyrolysis heats a carbonaceous waste stream typically to 290--900 C in the absence of oxygen, and reduces the volume of waste by 90% and its weight by 75%. The solid carbon char has existing markets as an ingredient in many manufactured goods, and as an adsorbent or filter to sequester certain hazardous wastes. Pyrolytic gases may be burned as fuel by utilities, or liquefied for use as chemical feedstocks, or low-pollution motor vehicle fuels and fuel additives. This report analyzes the potential applications of pyrolysis in the Long Island region and evaluates for the four most promising pyrolytic systems their technological and commercial readiness, their applicability to regional waste management needs, and their conformity with DOE requirements for environmental restoration and waste management. This summary characterizes their engineering performance, environmental effects, costs, product applications, and markets. Because it can effectively treat those wastes that are inadequately addressed by current systems, pyrolysis can play an important complementing role in the region`s existing waste management strategy. Its role could be even more significant if the region moves away from existing commitments to incineration and MSW composting. Either way, Long Island could become the center for a pyrolysis-based recovery services industry serving global markets in municipal solid waste treatment and hazardous waste cleanup. 162 refs.

  6. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    SciTech Connect (OSTI)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview of the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.

  7. DOE-HDBK-1114-98 | Department of Energy

    Energy Savers [EERE]

    4-98 DOE-HDBK-1114-98 August 13,1997 DOE-HDBK-1114-98: Guide to Good Practices for Line and Training Manager Activities Canceled, Effective February 2016 | Superseding DOE-STD-1056-93 (February 1993) The purpose of this guide is to provide direction for line and training managers in carrying out their responsibilities for training and qualifying assigned personnel and to verify that existing training activities are effective. PDF icon DOE-HDBK-1114-98, Guide to Good Practices for Line and

  8. DOE-sponsored aging management guideline for electrical cable and terminators

    SciTech Connect (OSTI)

    Gazdzinski, R.F.

    1996-03-01

    The DOE-sponsored Aging Management Guideline (AMG) for Electrical Cable and Terminations provides an analysis of the potential age-related degradation mechanisms and effects for low-voltage and medium-voltage extruded cables and associated terminations used in commercial nuclear power plants. The AMG examined historical industry failure data and correlated this with postulated aging mechanisms and effects. Existing and developmental testing and condition monitoring techniques were evaluated, as well as current industry practices, in order to assess whether all significant aging mechanisms/effects are being effectively managed. Results of the study indicate that some aging mechanisms and effects are not directly addressed by current industry maintenance and surveillance practices; however, empirical evidence indicates that low- and medium-voltage cable and terminations are in general very reliable. A limited number of nondestructive (or essentially nondestructive) techniques currently available are potentially useful for evaluating low-voltage cable condition; however, such techniques do not currently exist for monitoring medium-voltage cable. Troubleshooting or diagnostic techniques are available to identify certain types of degradation.

  9. DOE-STD-1063-2011 | Department of Energy

    Energy Savers [EERE]

    April 18, 2012 Facility Representatives Change Notice 1 (March 2012) The purpose of the DOE FR Program is to ensure that competent DOE staff personnel are assigned to oversee the day-to-day contractor operations at DOE's hazardous nuclear and non-nuclear facilities.Oversight performed by FRs provides DOE Line Managers with accurate, objective information on the effectiveness of contractor work performance and practices, including implementation of the integrated safety management system. PDF

  10. Management & Operating (M&O) Contracts | U.S. DOE Office of Science...

    Office of Science (SC) Website

    ... by cognizant Secretarial officials, the Procurement Executive for DOE and the DOE Chief Financial Officer, prior to being referred to the Secretary of Energy for a decision. ...

  11. DOE Issues Sources Sought/Request for Information for Oak Ridge Office of Environmental Management Technical Support Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities to meet all of the requirements for the potential upcoming procurement for Oak Ridge Office of Environmental Management (OREM) Technical Support Services. The purpose of the Sources Sought/RFI is to solicit interested parties’ input from small business concerns, with the intent of assessing set-aside possibilities.

  12. DRAFT DOE Training Curriculum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Training Curriculum DOE-100DE Federal Staff Orientation Training DOE-120 DOE Oversight and Implementation DOE-140 Developing Integrated Oversight Plans (Managers/Supervisors) PHY-128DE Basic Survey Overview PHY-130 Basic Survey VAP-335 Fundamentals of Performance Testing DOE-200DE Assessment Fundamentals DOE-210 Assessment Preparation DOE-220 Assessment Techniques DOE-130 Performance Management Fundamentals DOE-310 Oversight Data Analysis & Reporting DOE-320 Causal Analysis &

  13. Geographic Information System Tools for Management of US DOE Sites - 13489

    SciTech Connect (OSTI)

    Carpenter, Cliff; Pilz, Elaine; Pawel, Steve

    2013-07-01

    The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

  14. THE DOE OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL COOPERATIVE PROGRAM: OVERVIEW OF TECHNICAL TASKS AND RESULTS

    SciTech Connect (OSTI)

    Marra, J.; Fox, K.; Farfan, E.; Jannik, T.

    2009-12-08

    The DOE Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EM's International Cooperative Program. Over the past 15 years, collaborative work has been conducted through this program with researchers in Russia, Ukraine, France, United Kingdom and Republic of Korea. Currently, work is being conducted with researchers in Russia and Ukraine. Efforts aimed at evaluating and advancing technologies to support U.S. high-level waste (HLW) vitrification initiatives are being conducted in collaboration with Russian researchers. Work at Khlopin Radium Institute (KRI) is targeted at improving the throughput of current vitrification processes by increasing melting rate. These efforts are specifically targeted at challenging waste types identified at the Savannah River Site (SRS) and Hanford Site. The objectives of current efforts at SIA Radon are to gain insight into vitrification process limits for the cold crucible induction melter (CCIM) technology. Previous demonstration testing has shown that the CCIM offers the potential for dramatic increases in waste loading and waste throughput. However, little information is known regarding operational limits that could affect long-term, efficient CCIM operations. Collaborative work with the Russian Electrotechnical University (ETU) 'LETI' is aimed at advancing CCIM process monitoring, process control and design. The goal is to further mature the CCIM technology and to establish it as a viable HLW vitrification technology. The greater than two year effort conducted with the International Radioecology Laboratory in the Ukraine recently completed. The objectives of this study were: to assess the long-term impacts to the environment from radiation exposure in the Chernobyl Exclusion Zone (ChEZ); and to provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories around the Chernobyl Nuclear Power Plant (ChNPP) based on the results of long-term field monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination.

  15. The DOE Office of Environmental Management International Cooperative Program: Overview of Technical Tasks and Results

    SciTech Connect (OSTI)

    Marra, James C.; Fox, Kevin M.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Lopukh, D. B.; Bondarkov, M. D.; Gerdes, Kurt D.; Han, Ana M.

    2010-01-22

    The DOE Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EMs International Cooperative Program. Over the past 15 years, collaborative work has been conducted through this program with researchers in Russia, Ukraine, France, United Kingdom and Republic of Korea. Currently, work is being conducted with researchers in Russia and Ukraine. Efforts aimed at evaluating and advancing technologies to support U.S. high-level waste (HLW) vitrification initiatives are being conducted in collaboration with Russian researchers. Work at Khlopin Radium Institute (KRI) is targeted at improving the throughput of current vitrification processes by increasing melting rate. These efforts are specifically targeted at challenging waste types identified at the Savannah River Site (SRS) and Hanford Site. The objectives of current efforts at SIA Radon are to gain insight into vitrification process limits for the cold crucible induction melter (CCIM) technology. Previous demonstration testing has shown that the CCIM offers the potential for dramatic increases in waste loading and waste throughput. However, little information is known regarding operational limits that could affect long-term, efficient CCIM operations. Collaborative work with the Russian Electrotechnical University (ETU) LETI is aimed at advancing CCIM process monitoring, process control and design. The goal is to further mature the CCIM technology and to establish it as a viable HLW vitrification technology. The greater than two year effort conducted with the International Radioecology Laboratory in the Ukraine recently completed. The objectives of this study were: to assess the long-term impacts to the environment from radiation exposure in the Chernobyl Exclusion Zone (ChEZ); and to provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories around the Chernobyl Nuclear Power Plant (ChNPP) based on the results of long-term field monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination.

  16. DRAFT - DOE G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide is intended to assist sites in sustainable planning, management, and reuse of assets that allows effective mission execution, optimizes federal and public resources, and supports local and national goals for economic growth and diversification in support of DOE O 430.1B.

  17. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM2.5) RESEARCH

    SciTech Connect (OSTI)

    Robinson P. Khosah; Charles G. Crawford

    2003-03-13

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its sixth month of Phase 1 development activities.

  18. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    SciTech Connect (OSTI)

    Robinson Khosah

    2007-07-31

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project was conducted in two phases. Phase One included the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two involved the development of a platform for on-line data analysis. Phase Two included the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now technically completed.

  19. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    SciTech Connect (OSTI)

    Robinson P. Khosah; Frank T. Alex

    2007-02-11

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-eighth month of development activities.

  20. Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17)

    SciTech Connect (OSTI)

    N /A

    2001-09-13

    BPA proposes to partially fund the acquisition of 7,630 acres of shrub-steppe, riparian, and wetland habitat in northern Franklin County, Washington. Title to the land will be transferred initially to The Conservation Fund and ultimately for inclusion as part of the National Wildlife Refuge System. Passive management practices will take place on the land until an official management plan is developed and approved for the property. Some short-term control of invasive, exotic plant species may occur as necessary prior to the approval of a management plan. The compliance checklist for this project was completed by Randy Hill with the U.S. Fish and Wildlife Service, Columbia National Wildlife Refuge and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD). A comprehensive management plan will be prepared for the property after it is acquired and will follow the guidelines and mitigation measures detailed in the Wildlife Mitigation Program EIS and ROD. No plant or animal species listed under the Endangered Species Act (ESA) will be affected by the fee-title purchase of the subject property. Mark Miller with the Eastern Washington Ecological Services Office of USFWS concurred with this finding on August 3, 2001. Section 7 consultation will be conducted by BPA and USFWS, as necessary, prior to the implementation of any restoration or enhancement activities on the site. In accordance with the National Historic Preservation Act of 1966 (NHPA) and USFWS policy, the addition of the Eagle Lakes property to the National Wildlife Refuge System does not constitute an undertaking as defined by the NHPA, or require compliance with Section 106 of the NHPA. Anan Raymond, Regional Archaeologist with USFWS Region 1 Cultural Resource Team, concurred with this finding on May 4, 2001. Compliance with NHPA, including cultural resources surveys, will be implemented, as necessary, once specific management activities are proposed for the property. In the unlikely event that archaeological material is encountered during developments that might occur prior to a cultural resource survey, an archeologist will immediately be notified and work halted in the vicinity of the finds until they can be inspected and assessed. A Level I Contaminants Survey was completed on April 3, 2000 by Toni Davidson, Environmental Contaminants Specialist with the USFWS Upper Columbia River Basin Field Office. The survey found that overall the lakes, wetlands, and terrestrial habitats on the site appear to be in a healthy condition. The only concern expressed in the survey report was over the presence of two household/farm dumps. As a requirement of the Eagle Lakes sale, the landowner agreed to remove the dumps to the satisfaction of the USFWS contaminant specialist before the title to the land is transferred. A follow-up survey will be conducted to confirm compliance with this requirement of sale. Public involvement associated with this project has included written notification and solicitation of comments to interested parties, adjacent landowners, local tribes, government agencies, non-governmental organizations, and sports clubs. Public response from the mail-out indicated general support for the project, although some questions were raised about the provision of seasonal hunting and fishing on the property. These types of questions will be addressed in the development of a management plan for the Eagle Lakes land. Because of initial favorable comments on this project, it was decided that subsequent public meetings and/or workshops were not warranted.

  1. Keep in mind, that with formality, often comes more of a standing presence of a committee within DOE-it gets into DOE's system and becomes a budget line item as well

    Office of Environmental Management (EM)

    LEADER FORUM: U.S. DEPARTMENT OF ENERGY OIL AND GAS TECHNICAL ASSISTANCE CAPABILITIES August 18, 2015 Magnolia Hotel 818 17 th St. Denver, Colorado 80202 (303) 607-9000 The twelfth in a series of planned United States Department of Energy (DOE) Office of Indian Energy- sponsored strategic energy development forums, this Tribal Leader Forum will focus on presenting NETL's Oil and Gas Program overview and overall capabilities related to program management, system analysis, and applied research in

  2. DOE F

    Office of Environmental Management (EM)

    242.1 (12-2014) U.S. DEPARTMENT OF ENERGY Forms Manager Designation SECTION I. Designation Information Pursuant to DOE Guide 242.1-1, Forms Management Guide, (Name) _______________________________________________ is hereby designated a Forms Manager for (DOE Organization/Contractor Activity) ____________________________________________________________________. The incumbent's responsibilities include providing guidance and assisting within their respective organizations, supporting applicable

  3. Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (DOE, 2002)

    Broader source: Energy.gov [DOE]

    This DOE guidelines sets forth policy and procedures to ensure and maximize the quality, utility, objectivity, and integrity of the information that DOE disseminates to members of the public. DOE has prepared this final report pursuant to OMB government-wide guidelines under section 515 of the Treasury and General Government Appropriations Act for Fiscal Year 2001.

  4. Various Project Management Reports | U.S. DOE Office of Science...

    Office of Science (SC) Website

    Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project...

  5. Data Management Resources | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Data Management Resources User Facilities User Facilities Home User Facilities at a Glance User Resources Getting Started User Safety Access Models User Agreements Data Management...

  6. DOE-STD-1090-2011

    Broader source: Energy.gov [DOE]

    Hoisting and Rigging (Formerly Hoisting and Rigging Manual) Superseding DOE-STD-1090-2007 (August 2007) The U.S. Department of Energy (DOE) Hoisting and Rigging Standard is intended to be used by supervisors, line managers, safety personnel, equipment operators, riggers and other personnel responsible for the safety of hoisting and rigging operations at DOE sites. It may be used as either contract document or as a best practices guide at the site’s or program office’s discretion.

  7. ORAU-managed ORISE again recognized as DOE "Legacy of Stars" site for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    outstanding safety and health performance ORAU-managed ORISE again recognized as DOE "Legacy of Stars" site for outstanding safety and health performance ORAU safety and health director honored for excellent program leadership FOR IMMEDIATE RELEASE: Oct. 20, 2010 FY11-02 OAK RIDGE, Tenn.-The Oak Ridge Institute for Science and Education, which is managed by Oak Ridge Associated Universities, was recently named a 2010 Legacy of Stars site. This is the second consecutive time ORISE

  8. ORISE: DOE recognizes partnership with ORAU for long-time management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    support of DOE's Tennessee Science Bowl, an annual competition aimed at encouraging high school students to excel in science and math and to pursue careers in those fields. ...

  9. International technology catalogue: Foreign technologies to support the environmental restoration and waste management needs of the DOE complex

    SciTech Connect (OSTI)

    Matalucci, R.V.; Jimenez, R.D.; Esparza-Baca, C.

    1995-07-01

    This document represents a summary of 27 foreign-based environmental restoration and waste management technologies that have been screened and technically evaluated for application to the cleanup problems of the Department of Energy (DOE) nuclear weapons complex. The evaluation of these technologies was initiated in 1992 and completed in 1995 under the DOE`s International Technology Coordination Program of the Office of Technology Development. A methodology was developed for conducting a country-by-country survey of several regions of the world where specific environmental technology capabilities and market potential were investigated. The countries that were selected from a rank-ordering process for the survey included: then West Germany, the Netherlands, France, Japan, Taiwan, the Czech and Slovak Republics, and the Former Soviet Union. The notably innovative foreign technologies included in this document were screened initially from a list of several hundred, and then evaluated based on criteria that examined for level of maturity, suitability to the DOE needs, and for potential cost effective application at a DOE site. Each of the selected foreign technologies that were evaluated in this effort for DOE application were subsequently matched with site-specific environmental problem units across the DOE complex using the Technology Needs Assessment CROSSWALK Report. For ease of tracking these technologies to site problem units, and to facilitate their input into the DOE EnviroTRADE Information System, they were categorized into the following three areas: (1) characterization, monitoring and sensors, (2) waste treatment and separations, and (3) waste containment. Technical data profiles regarding these technologies include title and description, performance information, development status, key regulatory considerations, intellectual property rights, institute and contact personnel, and references.

  10. Ms. Elizabeth Withers, EIS Document Manager U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration (NNSA)

    August 14, 2002 Ms. Elizabeth Withers, EIS Document Manager U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) Office of Los Alamos Site Operations (OLASO) 528 35 th Street Los Alamos, NM 87544 Re: Comments regarding the scope of the Environmental Impact Statement (EIS) for the proposed Chemistry and Metallurgy Research (CMR) Building Replacement (CMRR) Project (CMRRP) at Los Alamos National Laboratory (LANL) (the "CMRRP EIS") Dear Elizabeth - I won't be

  11. Various Project Management Reports | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown

  12. Conference Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-03

    To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

  13. Geology Report: Area 3 Radioactive Waste Management Site DOE/Nevada Test Site, Nye County, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2006-07-01

    Surficial geologic studies near the Area 3 Radioactive Waste Management Site (RWMS) were conducted as part of a site characterization program. Studies included evaluation of the potential for future volcanism and Area 3 fault activity that could impact waste disposal operations at the Area 3 RWMS. Future volcanic activity could lead to disruption of the Area 3 RWMS. Local and regional studies of volcanic risk indicate that major changes in regional volcanic activity within the next 1,000 years are not likely. Mapped basalts of Paiute Ridge, Nye Canyon, and nearby Scarp Canyon are Miocene in age. There is a lack of evidence for post-Miocene volcanism in the subsurface of Yucca Flat, and the hazard of basaltic volcanism at the Area 3 RWMS, within the 1,000-year regulatory period, is very low and not a forseeable future event. Studies included a literature review and data analysis to evaluate unclassified published and unpublished information regarding the Area 3 and East Branch Area 3 faults mapped in Area 3 and southern Area 7. Two trenches were excavated along the Area 3 fault to search for evidence of near-surface movement prior to nuclear testing. Allostratigraphic units and fractures were mapped in Trenches ST02 and ST03. The Area 3 fault is a plane of weakness that has undergone strain resulting from stress imposed by natural events and underground nuclear testing. No major vertical displacement on the Area 3 fault since the Early Holocene, and probably since the Middle Pleistocene, can be demonstrated. The lack of major displacement within this time frame and minimal vertical extent of minor fractures suggest that waste disposal operations at the Area 3 RWMS will not be impacted substantially by the Area 3 fault, within the regulatory compliance period. A geomorphic surface map of Yucca Flat utilizes the recent geomorphology and soil characterization work done in adjacent northern Frenchman Flat. The approach taken was to adopt the map unit boundaries (line work) of Swadley and Hoover (1990) and re-label these with map unit designations like those in northern Frenchman Flat (Huckins-Gang et al, 1995a,b,c; Snyder et al, 1995a,b,c,d).

  14. Position Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-06-23

    The order prescribes the policies, responsibilities, and procedures for position management within (DOE). Canceled by DOE N 1321.140. Cancels DOE 3510.1

  15. CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4,

    Energy Savers [EERE]

    2007 | Department of Energy CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 December 4, 2007 Feedback and Continuous Improvement Inspection Criteria and Approach - DOE Headquarters (HSS CRAD 64-22) The Department of Energy (DOE) Headquarters line management has established and implemented effective oversight processes that evaluate the adequacy and effectiveness of field element

  16. The Modern Grid Initiative is a DOE-funded project managed by...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    team does have some interesting insights into the future possibilities. The GenX GenY Theory of Grid Modernization Traveling through airports a lot, I see a distinct difference...

  17. The Modern Grid Initiative is a DOE-funded project managed by...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    within the industry to a more diverse portfolio. This non-traditional future could add risk and upset traditional business models. So what. McAdams Theorem 1 does not support...

  18. DOE to Address Small Businesses Barriers in Government Contracting at Waste Management Conference

    Broader source: Energy.gov [DOE]

    PHOENIX EM and the DOE Office of Small and Disadvantaged Business Utilization (OSDBU) are working to address barriers that hinder small businesses from competing for prime contracts for work in the Cold War cleanup program.

  19. Manage Your Grant | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Standard reporting requirements for DOE's Office of Science (SC) are set forth on SC's Grants and Contracts web site here. Specific guidance for EPSCoR grantees is provided below. ...

  20. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year...

  1. Implementation Guide for Use with DOE O 460.2 Departmental Materials Transportation and Packaging Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-11-15

    The purpose of this guide is to assist those responsible for transporting and packaging Department materials, and to provide an understanding of Department policies on activities which supplement regulatory requirements. Does not cancel/supersede other directives.

  2. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year...

  3. Suggested Elements for a Data Management Plan | U.S. DOE Office of Science

    Office of Science (SC) Website

    (SC) Suggested Elements for a Data Management Plan Funding Opportunities Funding Opportunities Home Grants & Contracts Support Award Search / Public Abstracts Find Funding Early Career Research Program Statement on Digital Data Management Suggested Elements for a Data Management Plan Frequently Asked Questions Resources at the Office of Science User Facilities Acknowledgements of Federal Support Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW

  4. Earned Value Management System (EVMS) Certifications | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) Earned Value Management System (EVMS) Certifications Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW

  5. Operations Program Management (OPM) Homepage | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) Laboratories » OPM Home Operations Program Management (OPM) OPM Home About Science Laboratories Infrastructure (SLI) Program Safeguards & Security (S&S) Program Sustainability Contact Information Operations Program Management U.S. Department of Energy SC-33/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-8429 F: (301) 903-7047 More Information » Print Text Size: A A A FeedbackShare Page The Office of Operations Program Management supports the

  6. Microsoft Word - SRP on Application of Engineering and Technical Requirements to DOE Nuclear Facilities_Projects_CNS_Draft Fina

    Office of Environmental Management (EM)

    Final for DOE Peer Review - December 28, 2012 1 Standard Review Plan Application of Engineering and Technical Requirements for DOE Nuclear Facilities Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities and Projects Draft Final for DOE Peer Review- December 28, 2012 Draft Final for DOE Peer Review - December 28, 2012 2 Table of Contents Objective

  7. NEW - DOE O 325.2 Chg 1 (Admin Chg), Position Management and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O 325.2 Chg 1 (Admin Chg), Position Management and Classification by Patricia Greeson The order establishes departmental requirements and responsibilities for classifying positions...

  8. Notice of Intent to Revise DOE O 313.1, Management and Funding...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    needs to be reflected in the Order, as well as several administrative changes related to lessons-learned from managing the overseas presence via the Overseas Presence Advisory...

  9. Certification for DOE O 440.2C, Aviation Management and Safety...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    KB Writer: Patricia Greeson Subjects: ID: CM Type: Certification Memo OPI: MA - Office of Management Status: Current Approved Date: Jul 16, 2015 CRD: No DNFSB: No Related History...

  10. 2008 Project Management Awards | U.S. DOE Office of Science ...

    Office of Science (SC) Website

    Presented at the 2009 Department of Energy Project Management Workshop SECRETARY'S AWARD ... Insert photo credit here... Left to Right: Secretary Chu, Daniel Green (CMS Project ...

  11. DOE/NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT AND OPERATION OF THE PANTEX PLANT

    National Nuclear Security Administration (NNSA)

    =----=-..,~~~-~-(/ () 1 3 even C. Er Manager, NNSA Production Office National Nuclear Security Administration eb . lein Contracting Officer NNSA Production Office Pantex National Nuclear Security Administration

  12. Life Cycle Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-10-14

    (The following directives are deleted or consolidated into this Order and shall be phased out as noted in Paragraph 2: DOE 1332.1A; DOE 4010.1A; DOE 4300.1C; DOE 4320.1B; DOE 4320.2A; DOE 4330.4B; DOE 4330.5; DOE 4540.1C; DOE 4700.1). This Order supersedes specific project management provisions within DOE O 430.1A, LIFE CYCLE ASSET MANAGEMENT. The specific paragraphs canceled by this Order are 6e(7); 7a(3); 7b(11) and (14); 7c(4),(6),(7),(11), and (16); 7d(4) and (8); 7e(3),(10), and (17); Attachment 1, Definitions (item 30 - Line Item Project, item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). The remainder of DOE O 430.1A remains in effect. Cancels DOE O 430.1. Canceled by DOE O 413.3.

  13. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Biological and Environmental Research (BER) BER Home About Research Facilities Science Highlights Benefits of BER Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Peer Review Policy Grants & Contracts Guidance Laboratory Scientific Focus Area

  14. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Fusion Energy Sciences (FES) FES Home About Research Facilities Science Highlights Benefits of FES Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Fusion Energy Sciences Advisory Committee (FESAC) Community Resources Contact Information Fusion

  15. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management

  16. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Office of Science (SC) Website

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Reviews NP Early Career Opportunities Nuclear Science Advisory Committee (NSAC) Community Resources Contact

  17. DOE - Office of Legacy Management -- Morse Chemical Co - IL 0-05

    Office of Legacy Management (LM)

    Morse Chemical Co - IL 0-05 FUSRAP Considered Sites Site: MORSE CHEMICAL CO. (IL.0-05 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 8 South Michigan Avenue , Chicago , Illinois IL.05-1 Evaluation Year: 1987 IL.05-3 Site Operations: Submitted a bid to AEC for thorium work; proposal was not accepted; no indication work done for a DOE predecessor at this site. IL.05-3 Site Disposition: Eliminated - No Authority - No work for a DOE

  18. Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Guide provides information on principles and practices used to establish and implement an effective quality assurance program or quality management system in accordance with the requirements of 10 CFR 830. Cancels DOE G 414.1-2. Canceled by DOE G 414.1-2B.

  19. Real Property Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Real Property Management Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Don F. Thress, Jr. U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-4444 Services Real Property Management Print Text Size: A A A FeedbackShare Page Real Property Management

  20. EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho Summary The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE's Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA's proposed action is