  1. DOE Issues Draft RFP for Hanford Site Lab Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab.

  2. DOE Issues Draft Request for Proposals for the West Valley Demonstrati...

    Energy Savers [EERE]

    West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service DOE Issues Draft Request for Proposals for the West Valley Demonstration Project ...

  3. DOE Issues Two Draft National Interest Electric Transmission Corridor Designations

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors.

  4. DOE Issues Draft RFP for Waste Treatment Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft RFP for Waste Treatment Services DOE Issues Draft RFP for Waste Treatment Services October 31, 2014 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-046, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for Low-Level Waste (LLW) and Mixed-Low Level Waste (MLLW) treatment services that may result in the issuance of one or more Basic Ordering Agreements (BOAs). The RFP is for the treatment of LLW and MLLW

  5. DOE Issues Draft RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Draft RFP for Idaho Cleanup Project Core December 22, 2014 - 2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement. The ICP Core procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition

  6. DOE Issues Draft Request for Proposals for Services at Carlsbad New Mexico

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Services at Carlsbad New Mexico DOE Issues Draft Request for Proposals for Services at Carlsbad New Mexico December 22, 2014 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for a technical assistance contract acquisition at the Carlsbad Field Office in New Mexico. A hybrid contract that includes fixed-price and Requirements

  7. DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico.

  8. DOE Issues Draft Request for Proposals for Hanford Site Occupational

    Office of Environmental Management (EM)

    Certify Air Conditioners and Heat Pumps | Department of Energy Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps February 4, 2010 - 1:58pm Addthis Washington, DC - The Department of Energy's Office of General Counsel has issued a Notice of Proposed Civil Penalty to AeroSys, Inc. for failing to file certification reports or filing data that was not derived

  9. DOE Issues Draft Request for Proposals for the West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposals (RFP) for the West Valley Demonstration Project Supplemental Environmental Impact Statement (WVDP-SEIS) procurement that will provide support to the U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), and the New York State Energy Research and Development Authority (NYSERDA) in developing a Supplemental Environmental Impact Statement for the WVDP and Western New York Nuclear Service Center.

  10. Department of Energy Issues Draft Request for Proposals for Argonne

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory Contractor | Department of Energy Request for Proposals for Argonne National Laboratory Contractor Department of Energy Issues Draft Request for Proposals for Argonne National Laboratory Contractor January 3, 2006 - 9:06am Addthis WASHINGTON, DC -- The Department of Energy (DOE) is seeking comments on a draft Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor for Argonne National Laboratory (ANL), a major DOE

  11. DRAFT DOE Training Curriculum

    Energy Savers [EERE]

    (ManagersSupervisors) PHY-128DE Basic Survey Overview PHY-130 Basic Survey VAP-335 Fundamentals of Performance Testing DOE-200DE Assessment Fundamentals DOE-210 Assessment...

  12. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional information is available via the procurement website at: https:www.emcbc.doe.govSEBwipptransportationservicesindex.php Addthis Related Articles DOE Issues Draft ...

  13. Draft DOE P 226

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extension of DOE N XXX.X (Title) Synopsis Summary Background: The Office of XXXXXXXXXXXX (XX) is requesting a 1-year extension to DOE N XXX.X, (Title), dated XX-XX-XX. The Notice ...

  14. Department of Energy Issues Draft Renewable Energy and Efficient...

    Energy Savers [EERE]

    Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy ...

  15. Discussion Draft, DOE Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that provides an independent avenue for employees to bring forth their issues without fear of reprisal. * Openness and Transparency Related to Tank Waste Treatment (December 12,...

  16. EA-1790: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc, MS The U.S. Department of Energy (DOE) has prepared a draft Environmental...

  17. EIS-0453: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0453: DOE Notice of ... the Draft Environmental Impact Statement (EIS) for the Recapitalization of Infrastructure ...

  18. Energy Department Issues Draft Request For Proposal for the Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Environmental Management Headquarters Information Technology Services Procurement Energy Department Issues Draft Request For Proposal for the Environmental Management ...

  19. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  20. DOE Draft Standard, Development and Use of Probabilistic Risk...

    Office of Environmental Management (EM)

    Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 1210 DOE Draft Standard, Development and Use of ...

  1. DOE O XXX.X DRAFT XX-XX-XX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE O XXX.X DRAFT XX-XX-XX 4 DOE O XXX.X DRAFT XX-XX-XX DOE O XXX.X 3 DRAFT XX-XX-XX DOE O XXX.X Appendix A DRAFT XX-XX-XX A- 1 (and A-2) DOE O XXX.X Attachment 1 DRAFT XX-XX-XX Page 1 (and Page 2) Appendix E DOE O 251.1C E- 6 1-15-09 DOE O XXX.X Attachment 2 DRAFT XX-XX-XX Page 1 (and Page 2) draftDOE O XXX.XdraftDOE O XXX.Xu.s. Department of EnergyORDER draft DOE O XXX.X draft DOE O XXX.X Washington, DC Approved: XX-XX-XXXX SUBJECT: title PURPOSE. (Define the program or subject matter and its

  2. EIS-0396: DOE Notice of Availability of the Draft Programmatic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement | Department of Energy DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0396: DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The Department of Energy (DOE) announces the availability of the Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (Draft GNEP PEIS, DOE/EIS-0396). Notice of Availability of Draft Global Nuclear

  3. Energy Department Issues Draft Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement.

  4. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation Conference for Savannah River Site Liquid Waste Services

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for liquid waste services at the Savannah River Site (SRS).

  5. Department of Energy Issues Draft Renewable Energy and Efficient Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Solicitation to Foster Clean Energy Innovation | Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation April 16, 2014 - 1:35pm Addthis In support of the Administration's all of the above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for

  6. EIS-0499: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 9: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0499: DOE Notice of Availability of Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota The U.S. Department of Energy (DOE) announced the availability of the Draft Environmental Impact Statement for the Great Northern Transmission Line Project. DOE also is announcing the dates, times, and locations for public hearings to receive comments on the Draft

  7. Department of Energy Issues Draft Renewable Energy and Efficient...

    Office of Environmental Management (EM)

    Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects ...

  8. Department of Energy Issues Draft Loan Guarantee Solicitation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Loan Guarantee Solicitation for Advanced Nuclear Energy Projects Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects September 30, ...

  9. CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of Greenhouse Gas ...

  10. Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment

    Broader source: Energy.gov [DOE]

    DOE has issued the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)(DOE/EIS-0472D) for public review and comment. The public comment period ends May 16, 2013. Under the Uranium Leasing Program, the DOE Office of Legacy Management administers 31 tracts of land in Mesa, Montrose, and San Miguel counties that are leased to private entities to mine uranium and vanadium. The program covers an area of approximately 25,000 acres. No mining operations are active on the ULP lands at this time. DOE is preparing the ULP PEIS to analyze the reasonably foreseeable potential environmental impacts, including the site-specific and cumulative impacts, of the range of selected alternatives for managing the program.

  11. EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement DOE announces the availablity of the Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement for public review and comment. Comment period ends: 3/17/15.

  12. EIS-0472: DOE Notice of Availability of a Draft Programmatic...

    Energy Savers [EERE]

    DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the...

  13. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation...

    Broader source: Energy.gov (indexed) [DOE]

    Jim Giusti, 803-952-7684 Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for liquid waste services at the Savannah River Site ...

  14. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 18, 2008 | Department of Energy EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of this document is to seed discussion at the September 25-26, 2008 meeting of the DOE Electricity Advisory Committee (EAC). It does not represent the views of all members of the DOE EAC. Dissents received by publication of this draft document are included at the end. DOE EAC

  15. EA-1902: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Assessment EA-1902: Draft Environmental Assessment Northern Wind Project, Roberts County, South Dakota DOE's Western Area Power Administration issued a draft ...

  16. EIS-0486: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of Draft Environmental Impact Statement EIS-0486: DOE Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a draft EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600

  17. EIS-0503: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 3: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0503: DOE Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE announced the availability of the Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric

  18. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Office of Environmental Management (EM)

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  19. EA-1792-S1: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's ...

  20. Energy Department Issues Draft Request for Proposals for Operation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The draft RFP will be available on DOE's Industry Interactive Procurement System andor FedBizOpps. Media contact(s): Jeff Sherwood, (202) 586-4940 Walter Perry, (865) 576-0885 ...

  1. EIS-0481: DOE Notice of Availability of Draft Programmatic Environment...

    Energy Savers [EERE]

    31715. For more information on this project, see the project page: http:energy.govnode361381. Download Document PDF icon EIS-0481: DOE Notice of Availability of Draft...

  2. EA-1773: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze...

  3. EIS-0407: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas PDF icon E9-22920.pdf More Documents &...

  4. EIS-0464: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0464: DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, ...

  5. EIS-0414: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez ...

  6. EIS-0382: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of 36 million in cofunding, through a...

  7. Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage...

  8. DOE Issues Final RFP for Hanford Site Lab Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab. A Draft RFP was previously released on February 28, 2014, requesting comments from industry.

  9. DRAFT 2012 DOE Project Management Workshop Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT 2012 DOE Project Management Workshop Agenda DRAFT 2012 DOE Project Management Workshop Agenda 2012 Workshop Agenda_Ver_25 (For Distribution).pdf (38.46 KB) More Documents & Publications 2011 Workshop Agenda_Ver_19.xlsx 2011_Workshop_Agenda_Ver_16(1).pdf 2011 Workshop Agenda_Ver_21.xlsx

  10. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  11. DOE to Hold Public Meetings On Draft Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE to Hold Public Meetings On Draft Environmental Assessment Carlsbad, N.M., October 26, 2000 - The public is invited to comment on a draft environmental assessment for conducting astrophysics and other basic scientific experiments at the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP). The October 23 release of the draft environmental assessment begins a formal review process that includes a 30-day public comment period and two separate public information meetings. Public

  12. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070,...

  13. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determinations to Midea America Corporation and Felix Storch, Inc. for a compact freezer that, as determined by...

  14. DOE_StrategicPlan_Draft_tn.jpg | OSTI, US Dept of Energy Office of

    Office of Scientific and Technical Information (OSTI)

    Scientific and Technical Information DOE_StrategicPlan_Draft_tn

  15. DOE Draft Standard, Development and Use of Probabilistic Risk Assessments

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Department of Energy Nuclear Safety Applications, 12/10 | Department of Energy DOE Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 12/10 DOE Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 12/10 The Department has taken several actions to provide an infrastructure for providing appropriate controls and support for use of risk assessments and

  16. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Energy Savers [EERE]

    Impact Statement Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft...

  17. DRAFT - DOE O 227.1A, Independent Oversight Program - DOE Directives,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delegations, and Requirements DRAFT - DOE O 227.1A, Independent Oversight Program by Website Administrator The Order prescribes requirements and responsibilities for DOE Independent Oversight Program. DOE O 227.1A, Independent Oversight Program

  18. DOE Releases Draft Request for Proposal for Los Alamos Legacy Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract | Department of Energy for Los Alamos Legacy Cleanup Contract DOE Releases Draft Request for Proposal for Los Alamos Legacy Cleanup Contract May 26, 2016 - 4:00pm Addthis Media Contact Lynnette Chafin, 513-246-0461 Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for the Los Alamos Legacy Cleanup Contract (LLCC) acquisition. A contract that primarily includes cost-plus-award-fee contract line items for the purpose of continuing the

  19. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues Final RFP for Portsmouth Support Services DOE Issues Final RFP for Portsmouth Support Services December 16, 2014 - 11:03am Addthis The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses. This comes after the release of a draft RFP in early July. "A firm-fixed-price, labor hour, cost reimbursement, and indefinite delivery/indefinite quantity

  20. DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    through Deployment of Advanced Technology | Department of Energy Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology September 22, 2005 - 10:45am Addthis WASHINGTON, DC - The Department of Energy today released for public review and comment a plan for accelerating the development and reducing the cost of new and advanced

  1. Department of Energy Issues Draft Request for Proposals for Argonne...

    Energy Savers [EERE]

    ... Seeking a Contractor to Manage and Operate its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory

  2. DOE/EIS-0396\tDraft Global Nuclear Energy Partnership Programmatic...

    Broader source: Energy.gov (indexed) [DOE]

    SHEET RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE...

  3. EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis |

    Energy Savers [EERE]

    Department of Energy 60: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, Clive, Utah The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low- level radioactive waste disposal facility at the Nevada Test Site (NTS) or at

  4. DRAFT

    National Nuclear Security Administration (NNSA)

    Environmental Assessment for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Molybdenum-99 (DOE/EA-1929) Prepared for U.S. Department of Energy National Nuclear Security Administration Defense Nuclear Nonproliferation/ Global Threat Reduction Initiative July 2012 EA for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Mo-99 DRAFT ii This Page Intentionally Left Blank EA for NorthStar Medical Technologies LLC

  5. EIS-0375: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement (152.08 KB) More Documents & Publications EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: Final

  6. EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the availability of a Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DOE-NOA-DEIS-2013.pdf (202.73 KB) More Documents & Publications Uranium

  7. DOE Issues 82nd Lessons Learned Quarterly Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The 82nd Lessons Learned Quarterly Report (LLQR) features recently issued Council on Environmental Quality (CEQ) revised draft guidance on considering greenhouse gas emissions and ...

  8. EIS-0336: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement and Public Hearings | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact

  9. EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a separately-organized agency within the Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security

  10. EIS-0414: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement and Notice of Public Hearing | Department of Energy 14: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  11. EIS-0423: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement and Notice of Public Hearings | Department of Energy Draft Environmental Impact Statement and Notice of Public Hearings EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Long-Term Management and Storage of Elemental Mercury Download Document EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings (38.97 KB) More Documents & Publications EIS-0423: DOE Notice of

  12. DOE Extends Public Comment Period for the Draft Uranium Leasing Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement | Department of Energy Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement April 17, 2013 - 8:21am Addthis DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement The U.S. Department of Energy (DOE) today announced

  13. Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft Process Document

    Broader source: Energy.gov [DOE]

    On April 22, 2011, The U.S. Department of Energy (DOE) released a draft of DOE's Verification Testing in Support of ENERGY STAR Process Plan for 2011. DOE accepted comments through May 9, 2011 and...

  14. EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Tennessee Valley Authority (TVA) and other domestic commercial nuclear power reactors. ... PDF icon EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental Environmental ...

  15. Second Draft - DOE O 461.1C, Packaging and Transportation for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Second Draft - DOE O 461.1C, Packaging and Transportation for Offsite Shipment of Materials of National Security Interests by Patricia Greeson The Order establishes requirements...

  16. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation...

    Energy Savers [EERE]

    Plant Deactivation and Remediation Services DOE Releases Draft Request for Proposal and Announces Pre-Solicitation Conference for Paducah Gaseous Diffusion Plant Deactivation and ...

  17. CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy NEPA Guidance on GHG Emissions and Climate Change CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change March 3, 2015 - 10:37am Addthis CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change What are the key facts? CEQ issued revised draft guidance in December to "provide Federal agencies direction on when and how to consider the effects of greenhouse gas (GHG) emissions and climate change" in NEPA reviews. The revised

  18. EPA issues draft general permits for industrial stormwater discharges

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    EPA on Nov. 16, 1990, issued stormwater discharge regulations associated with industrial activity'' under the authority of CWA's National Pollutant Discharge Elimination System (NPDES). Those regulations established NPDES permit application requirements for industrial and certain municipal separate stormwater discharge systems. Three permit application options were made available for industrial stormwater discharges -- filing an individual application, becoming a participant in a group application or filing a notice of intent to be covered under a general permit and its requirements. The Agency of Nov. 19 proposed a draft general permit for group applications. Industrial dischargers choosing the group option previously were required to file in two parts. Part 1 was due by Sept. 30, 1991, and Part 2 was due by Oct. 1, 1992. The proposed permit would apply to industrial facilities, including certain Indian lands, in selected areas of EPA Regions I, II, III, IV, VI, VIII, IX and X. The permit would cover industrial stormwater discharges to US waters, and would include discharges transmitted through large, medium-sized and other municipal separate storm sewer systems.

  19. DRAFT Hanford Advisory Board Handout for PIC MTG 2/6/13 DOE NEPA vs. CERCLA Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board Handout for PIC MTG 2/6/13 DOE NEPA vs. CERCLA Process NEPA Notice of Intent (NOI) to prepare an EIS Published in Federal Register Scoping and Public Involvement Draft EIS Public Comment Period Final EIS Issued (with responses to public comments) NEPA ROD(s) Issued NEPA Mitigation Action Plan (USDOE) NEPA allows for judicial review before agency action under the Administrative Procedure Act (APA). RCRA Permitting Process with Opportunity for Public Comment for those units

  20. EIS-0355: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's

  1. EA-1792-S1: DOE Notice of Availability of the Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment | Department of Energy -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating

  2. DOE Issues 85th Lessons Learned Quarterly Report | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CORRECTED: DOE Issues 85th Lessons Learned Quarterly Report DOE Issues 82nd Lessons Learned Quarterly Report DOE Announces Webinars on Geography of Alternative Fuels, Wind Siting ...

  3. EIS-0473: DOE Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of a Draft Environmental Impact Statement EIS-0473: DOE Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the availability of the Draft Environmental Impact Statement for the W.A. Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE/EIS-0473D) for public review and comment, as well as the

  4. EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental

    Office of Environmental Management (EM)

    Programmatic Environmental Impact Statement and Notice of Public Hearings | Department of Energy Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings Complex Transformation The Draft Complex Transformation SPEIS analyzes the potential environmental impacts of reasonable alternatives to continue the transformation

  5. HAB Advice and Issue Tracking Process for Draft RCRA Site-Wide Permit Comment Period

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Issue Tracking Process for Draft RCRA Site-Wide Permit Comment Period Last updated 5/8/12 Introduction: The following document is a living document intended to be updated regularly to include new information and track issues related to the Draft Hanford Dangerous Waste Permit, also referred to as the RCRA Permit. Advice Process: 1. Assemble Issue Manager Team: Liz Mattson, Pam Larsen, Gerry Pollet, Jean Vanni, Steve Hudson 2. Prepare for years for the release of the Permit, work with Ecology

  6. EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement and Notice of Public Hearings | Department of Energy 50-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the

  7. EIS-0337: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  8. DOE Extends Public Comment Period for the Draft Uranium Leasing Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement | Department of Energy the Draft Uranium Leasing Program Programmatic Environmental Impact Statement DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement June 3, 2013 - 3:05pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov May 29, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S.

  9. DOE Office of Indian Energy Solar RFP Template (Draft) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy DOE Office of Indian Energy Solar RFP Template (Draft) DOE Office of Indian Energy Solar RFP Template (Draft) This document provides Tribes with a customizable request for proposals template for tribal solar photovoltaic systems, including roof-mounted, ground-mounted, and carport utility-interactive systems. The template contains information on project description, requirements, and submissions. Users can modify the template to suit their specific needs and projects. Source: DOE

  10. DOE Issues Final RFP for Portsmouth Support Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues Final RFP for Portsmouth Support Services DOE Issues Final RFP for Portsmouth Support Services December 16, 2014 - 11:03am Addthis The Department of Energy yesterday released a final request for proposals for infrastructure support services at the Portsmouth Gaseous Diffusion Plant that will be set aside for small businesses. This comes after the release of a draft RFP in early July. "A firm-fixed-price, labor hour, cost reimbursement, and indefinite delivery/indefinite quantity

  11. Energy Department Issues Draft Request For Proposal for Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional information on the DRFP is available at: https:www.emcbc.doe.govSEBNRCdraftrfppage.php. DOE has requested that all comments, questions, suggested changes, and ...

  12. EIS-0439: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    and the Loan Guarantee Program (LGP), the California Energy Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact Statement (EIS)...

  13. EIS-0433: DOE Comments on the Draft Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    XL Project. Comments on the Draft Environmental Impact Statement for the Keystone XL Pipeline Project, DOEEIS-433 (July 2010) More Documents & Publications EIS-0433: Final...

  14. EIS-0445: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement for the Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia, DOEEIS-0445 (March 2011 - 76 FR...

  15. EIS-0375: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Department of Energy, Notice of...

  16. EA-1656: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EA-1656: Finding of No Significant Impact EA-1656: Final Environmental Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment...

  17. EIS-0444: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement and Public Hearing Notice for the Texas Clean Energy Project, near Odessa, Ector County, Texas, DOEEIS-0444 (March 2011 - 76...

  18. DOE Issues Energy Sector Cyber Organization NOI

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues National Energy Sector Cyber Organization Notice of Intent February 11, 2010 The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) announced on Jan. 7 that it intends to issue a Funding Opportunity Announcement (FOA) for a National Energy Sector Cyber Organization, envisioned as a partnership between the federal government and energy sector stakeholders to protect the bulk power electric grid and aid the integration of smart grid technology to enhance the security

  19. EIS-0407: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas E9-22920.pdf (138.89 KB) More Documents & Publications EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact

  20. DOE issues Finding of No Significant Impact for the Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory U.S. DEPARTMENT OF ENERGY IDAHO OPERATIONS OFFICE Media Contact: Tim Jackson (208) 526-8484 For Immediate Release June 11, 2015 Public invited to comment on Draft Supplement Analysis on Two Proposed Shipments of Commercial Nuclear Fuel to Idaho National Laboratory for Research and Development Purposes The U.S. Department of Energy (DOE) invites the public to read and comment on a draft

  1. Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects

    Broader source: Energy.gov [DOE]

    The Department of Energy has issued a draft solicitation that would provide up to $12.6 billion in loan guarantees for Advanced Nuclear Energy Projects, supporting the Administration’s all-of-the-above energy strategy and bringing the nation closer to its low-carbon future.

  2. Draft

    Energy Savers [EERE]

    Draft Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994

  3. EIS-0396: DOE Notice of Availability of the Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0396: Notice of Intent to Prepare a Programmatic Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental ...

  4. Browse Draft Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Browse Draft Directives Current Draft Archives by Website Administrator More filters Less filters Directive Type Order Guide Manual Policy Notice Cancellation Notice HQ Order Sec of Energy Notice Justification Memorandum Certification Memo 0 Series Series All 0000 Subject Classification 100 Leadership/Management Planning 200 Information and Analysis 300 Human Resources 400 Work Processes 500 Business and Support Services 1100 Org. Authorities, Functions and Internal Relationships 1200 External

  5. Energy Department Issues Draft Request for Proposal for Nuclear Regulatory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Passenger Vehicle Efficiency | Department of Energy 137 Million Investment in Commercial and Passenger Vehicle Efficiency Energy Department Announces $137 Million Investment in Commercial and Passenger Vehicle Efficiency August 16, 2016 - 12:44pm Addthis NEWS MEDIA CONTACT (202) 586-4940 DOENews@hq.doe.gov SuperTruck II, Vehicle Technologies Office Program Wide Selections to Accelerate the Development of Innovative Technologies WASHINGTON - Today, as the U.S. Environmental Protection Agency

  6. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Energy Savers [EERE]

    ... Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and ...

  7. DOE Issues Request for Information on a Hydrogen Technology Showcase...

    Energy Savers [EERE]

    Issues Request for Information on a Hydrogen Technology Showcase and Training (HyTeST) Station DOE Issues Request for Information on a Hydrogen Technology Showcase and Training ...

  8. DOE issues Finding of No Significant Impact for the Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues ...

  9. Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation

    Broader source: Energy.gov [DOE]

    The Energy Department issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the United States that avoid, reduce, or sequester greenhouse gases.

  10. CEQ Issues Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ) issued revised draft guidance on consideration of greenhouse gas (GHG) emissions and the effects of climate change in National Environmental Policy Act (NEPA) reviews on December 18, 2014

  11. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conference for Waste Isolation Pilot Plant (WIPP) Transportation Services Procurement | Department of Energy Waste Isolation Pilot Plant (WIPP) Transportation Services Procurement DOE Releases Draft Request for Proposal and Announces Pre-Solicitation Conference for Waste Isolation Pilot Plant (WIPP) Transportation Services Procurement May 11, 2016 - 4:00pm Addthis Media Contact Bill Taylor, (575) 234-7591 bill.taylor@cbfo.doe.gov Cincinnati -- The U.S. Department of Energy (DOE)

  12. DOE Issues Request for Proposals for Services at Carlsbad New...

    Energy Savers [EERE]

    DOE Issues Request for Proposals for Services at Carlsbad New Mexico DOE Issues Request for Proposals for Services at Carlsbad New Mexico April 1, 2015 - 3:00pm Addthis Media...

  13. DOE Issues Funding Opportunity for Academic-Industry Collaboration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Academic-Industry Collaboration - Synchrophasor Engineering Education Program DOE Issues Funding Opportunity for Academic-Industry Collaboration - Synchrophasor Engineering ...

  14. DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards

    Broader source: Energy.gov [DOE]

    This procedure provides guidance for approving and issuing the Department of Energy (DOE) Technical Standards.

  15. DOE Issues Two Draft National Interest Electric Transmission...

    Office of Environmental Management (EM)

    ... of all options available to meet local, regional and national demand, which includes more local generation, transmission capacity, demand response, and energy efficiency measures. ...

  16. Draft News Release: DOE Investigates Shipment of Wrong Drum to...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    nuclear waste repository near Carlsbad, N.M. BBWI operates DOE's Advanced Mixed Waste Treatment Facility, located at the DOE's Idaho site, and certifies transuranic waste ...

  17. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007.

  18. DOE Commercial Building Energy Asset Score Web Service (Draft)

    SciTech Connect (OSTI)

    Elliott, Geoffrey; Wang, Na

    2013-09-30

    Documentation of the DOE Commercial Building Energy Asset Score application programming interface (API).

  19. Microsoft Word - DOE-GJ-97491-952-FINAL DRAFT_S01406.doc

    Office of Legacy Management (LM)

    March 2005 Office of Legacy Management DOE 952 - GJ79491 U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy ...

  20. EIS-0337: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    Impact Statement West Valley Demonstration Project Waste Management DOE's ... Impact Statement, West Valley Demonstration Project Waste Management Environmental ...

  1. DRAFT - DOE G 580.1-1A, Personal Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides non-regulatory guidance and information to assist DOE organizations and contractors in implementing the DOE-wide and site-specific personal property management programs. It supplements the policy, requirements, and responsibilities information contained in the DOE Order cited above and clarifies the regulatory requirements contained in the Federal Property Management Regulation (FMR) and specific contracts.

  2. DOE?s Idaho Operations Office Issues 2011-Beyond Strategic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    support DOE's missions in energy, science and national security, through excellence in management. The DOE-ID Strategic Plan sets out objectives for ID and its contractors that...

  3. Draft - DOE O 436.1A, Departmental Sustainability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order defines requirements and responsibilities for managing sustainability DOE to ensure that the Department carries out its missions in a sustainable manner that addresses national energy security and global environmental challenges, and advances sustainable, efficient and reliable energy for the future; institute wholesale cultural change to factor sustainability and greenhouse gas (GHG) reductions into all DOE corporate management decisions; and ensure that DOE achieves the sustainability goals established in its Strategic Sustainability Performance Plan.

  4. DRAFT

    Energy Savers [EERE]

    Presentations Procurements Foreign Travel Tech Transfer (WFO, CRADA, NDA, Copyrights, Invention Disclosure DOE TECHNOLOGY TRANSFER SECURITY AREAS: Oversight and Review Obligations...

  5. EIS-0450: DOE Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the TransWest Express Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies...

  6. EIS-0431: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carbon Capture and Sequestration Project, Kern County, CA DOE announces the availability ... Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. ...

  7. EIS-0408: DOE Notice of Availability of a Programmatic Draft...

    Broader source: Energy.gov (indexed) [DOE]

    jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy...

  8. Draft - DOE O 325.3, Staffing and Placement

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order establishes requirements and responsibilities for recruiting and staffing all competitive positions and General Schedule excepted service positions under Schedule A, B, and D at DOE.

  9. EIS-0447: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of...

  10. DRAFT - DOE O 333.1, Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    To provide requirements and responsibilities for administering workforce discipline that includes disciplinary, adverse, and alternative corrective actions in the Department of Energy (DOE).

  11. EIS-0336: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP...

  12. EIS-0499: DOE Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    Great Northern Transmission Line Project, Minnesota The U.S. Department of Energy (DOE) ... to grant a Presidential permit to Minnesota Power to construct, operate, maintain, ...

  13. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... educationtraining should issue appropriate credentials to go with certificate or degree. ... individuals come out with industry credentials or they are able to sit through and ...

  14. DRAFT

    Office of Environmental Management (EM)

    Advisory Board (SSAB) Chairs' meetings, several site boards, including the Northern New Mexico Citizen's Advisory Board (NNMCAB), have raised the issue of recycling of valuable...

  15. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Environmental Management (EM)

    Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm ...

  16. DOE Issues Request for Information for Scope Requirements Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information for Scope Requirements Planning at Los Alamos National Laboratory DOE Issues ... Completion Project Bridge Contract," reference number DE-SOL-0007781, for which a ...

  17. DOE Issues Request for Information for Potential WIPP Transportation...

    Office of Environmental Management (EM)

    Potential WIPP Transportation Services Procurement DOE Issues Request for Information for Potential WIPP Transportation Services Procurement February 4, 2016 - 1:00pm Addthis Media ...

  18. DOE Issues Request for Information for Richland Operations Office...

    Office of Environmental Management (EM)

    Contract Acquisition Planning- Occupational Medical Services (OccMed) DOE Issues Request for Information for Richland Operations Office Richland Acquisitions - Post Fiscal Year ...

  19. DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process September ...

  20. DOE Issues Final Site-Wide Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site...

  1. DOE Issues Request for Information on Hydrogen Contamination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office has issued a request for information (RFI) seeking feedback from interested stakeholders on existing and ...

  2. DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process...

  3. DOE's Carbon Storage Advances Featured in Special Issue of Internation...

    Energy Savers [EERE]

    DOE's Carbon Storage Advances Featured in Special Issue of ... monitor a geologic system to reduce uncertainty in ... conducted under the Energy Department's National Risk ...

  4. DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion...

    Energy Savers [EERE]

    Paducah Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services October 6, 2014 - 4:13pm Addthis Media ...

  5. DOE Issues Final Request for Proposal for Portsmouth Gaseous...

    Energy Savers [EERE]

    Portsmouth Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services December 9, 2014 - 3:37pm Addthis ...

  6. DOE Issues Request for Information on Fuel Cells for Continuous...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for Information on Fuel Cells for Continuous On-Board Recharging for Battery Electric Light-Duty Vehicles DOE Issues Request for Information on Fuel Cells for...

  7. DOE Issues RFP for West Valley Demonstration Project Probabilistic...

    Energy Savers [EERE]

    RFP for West Valley Demonstration Project Probabilistic Performance Assessment DOE Issues RFP for West Valley Demonstration Project Probabilistic Performance Assessment April 2, ...

  8. DRAFT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 25 June 2016 ______________________________________________________________________________ 1 Compliance with U.S. Export Control Laws, Regulations and Policies [References: FAR 17.6, DEAR 917.6, DEAR 925.71, AEA of 1954 as amended, DOE IG Report DOE/IG-0645, DOE IG Report INS-O-07-01, GAO Report GAO-11-354, EAA of 1979 as amended, EAR (15 CFR Parts 730-774), AECA (22 U.S.C. 2778), ITAR (22 CFR Parts 120-130), 10 CFR Part 810, 10 CFR Part 110, TWEA (50 U.S.C. App. 5(b) as amended), 31

  9. Geothermal Energy R&D Program Annual Progress Report for Fiscal Year 1989 Draft

    SciTech Connect (OSTI)

    1990-04-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE -2005)

  10. DRAFT

    Broader source: Energy.gov (indexed) [DOE]

    and Computations | Department of Energy 13 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting vss006_salari_2013_o.pdf (2.24 MB) More Documents & Publications Vehicle Technologies Office Merit Review 2014: DOE's Effort to Improve Heavy Vehicle Fuel Efficiency through Improved Aerodynamics DOEs Effort to Reduce Truck Aerodynamic Drag through Joint Experiments and Computations Vehicle Technologies Office Merit Review 2015:

  11. EIS-0473: DOE Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX ... Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE...

  12. EIS-0423: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    (DOEEIS-0423D)(75FR4801)(January 29, 2010) More Documents & Publications EIS-0423-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0423: DOE...

  13. Draft - DOE G 410.2-1, Nuclear Material Disposition

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This document provides a roadmap for implementing the requirements for disposition of nuclear material as outlined in the U.S. Department of Energy (DOE) Order 410.2, Management of Nuclear Materials, and DOE Order 474.2, Nuclear Material Control and Accountability. This Guide provides the basic framework for the nuclear material disposition process, includes information related to the Programmatic Value Determination (PVD) process, and identifies Discard Limits (DL) for specific low-equity nuclear materials.

  14. DOE SSL Postings: May 27, 2015, issue

    Energy Savers [EERE]

    from several DOE funding awards - the latest of which was just announced. He cites intellectual property protection as a major reason Pixelligent manufactures domestically,...

  15. Revised DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions (DOE, 2014)

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ) issued this revised draft guidance memorandum for public consideration and comment on the ways in which Federal agencies can improve their consideration...

  16. DOE/EA-1792S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... DeGraaf, R.M. and M. Yamasaki. 2001. New England Wildlife; Habitat, Natural History, and ... Journal of Experimental Marine Biology and Ecology. Volume 100, Issues 1-3, pp 3-9. ...

  17. Summary: Draft Uranium Leasing Program Programmatic Environmental Impact Statement: DOE/EIS 0472-D, March 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary: Draft ULP PEIS March 2013 COVER SHEET 1 2 3 Lead Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: The cooperating agencies are U.S. Department of the Interior (DOI), 6 Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado 7 Department of Transportation (CDOT); Colorado Division of Reclamation, Mining, and Safety 8 (CDRMS); Colorado Parks and Wildlife (CPW); Mesa County Commission; Montrose County 9 Commission; San Juan County Commission;

  18. DOE Releases Draft Request for Proposal and Announces Pre-Solicitation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conference for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services | Department of Energy and Announces Pre-Solicitation Conference for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services DOE Releases Draft Request for Proposal and Announces Pre-Solicitation Conference for Paducah Gaseous Diffusion Plant Deactivation and Remediation Services April 28, 2016 - 5:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Cincinnati -- The U.S. Department of

  19. Possible Draft HAB Comments for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    : Preliminary issue manager discussion draft; path forward TBD Possible Draft HAB Comments for Remedial Investigation/Feasibility Study and Proposed Plan for the 100-DR-1, 100-DR-2, 100- HR-1, 100-HR-2 and 100-HR-3 Operable Units, (DOE/RL-2010-95 and RL-2011-111, Draft A). * The Board supports the decision to proceed with remediation of the 100-D/H River Corridor areas, and is generally supportive of DOE's alternative analysis for the 100-D/H Areas. * Alternatives 2, 3 and 4 do not meet TPA

  20. DRAFT ADVICE - UNACCEPTABLE PROGRAM IMPACTS UNDER FY 97 BUDGET

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    adopted, in April and June 2001, advice with principles for ... DOE- Richland (DOE-RL) has now issued a draft Request for ... i) the contract's target budget is adequate for all ...

  1. DOE SSL Postings: September 16, 2015, issue

    Energy Savers [EERE]

    parts of Philips' OLED lighting business, including the OLED production facility in Germany. In May, the DOE SSL program announced the latest round of funding for OLED R&D...

  2. DOE SSL Postings: May 20, 2015, issue

    Energy Savers [EERE]

    20, 2015 GATEWAY Demonstration of LED Lighting in a High-Temperature Environment: One Year Later You may recall that last year, DOE's GATEWAY program published the initial report...

  3. DOE SSL Postings: April 10, 2015, issue

    Energy Savers [EERE]

    R&D Workshop Why attend these workshops? Quite simply, because there's no better way to stay abreast of the fast-moving SSL market and keep up with its cutting edge. DOE's annual...

  4. DOE SSL Postings, May 14, 2015, issue

    Energy Savers [EERE]

    last week. DOE's solid-state lighting team was at the show in full force, speaking in sessions on the LIGHTFAIR conference agenda, giving short educational talks in our...

  5. DOE SSL Postings: July 19, 2016, issue

    Energy Savers [EERE]

    Energy DOE Releases 2013 Fuel Cell Technologies Market Report DOE Releases 2013 Fuel Cell Technologies Market Report November 12, 2014 - 11:13am Addthis The Energy Department today released the 2013 Fuel Cell Technologies Market Report, detailing trends in the U.S. fuel cell and hydrogen technologies market. The report highlights continued growth in fuel cell commercial deployments, including material handling equipment such as forklifts as well as combined heat and power systems and back-up

  6. DRAFT

    Office of Environmental Management (EM)

    Approved 9-30-09 NORTHERN NEW MEXICO CITIZENS' ADVISORY BOARD (NNMCAB) Environmental Monitoring, Surveillance and Remediation Committee Recommendation to the Department of Energy No. 2009-10 Recommendation to Convene a Panel of Water Quality Experts Background Characterization of underground water has been an important component of the Department of Energy's (DOE) cleanup at Los Alamos National Laboratory (LANL). Water sample measurements from multiple wells have been key to deciding upon

  7. DRAFT

    Office of Environmental Management (EM)

    33.214 August 2016 ______________________________________________________________________________ 1 Alternative Dispute Resolution [References: FAR 33, DEAR 933] 1.0 Summary of Latest Changes This update: (1) adds a paragraph pertaining to clause DOE-H-2033 Alternative Dispute Resolution and (2) makes administrative changes. 2.0 Discussion This chapter supplements other more primary acquisition regulations and policies contained in the references above and should be considered in the context of

  8. DOE Issues Request for Information for Potential WIPP Transportation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Procurement | Department of Energy Information for Potential WIPP Transportation Services Procurement DOE Issues Request for Information for Potential WIPP Transportation Services Procurement February 4, 2016 - 1:00pm Addthis Media Contact Bill Taylor, 575-234-7591, bill.taylor@cbfo.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI) seeking interested

  9. DOE Issues Environmental Assessment on Road Project for Public Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues 88th Lessons Learned Quarterly Report DOE Issues 88th Lessons Learned Quarterly Report September 1, 2016 - 2:59pm Addthis The 88th Lessons Learned Quarterly Report highlights the Council on Environmental Quality final guidance on climate change, U.S. Fish and Wildlife Service migratory bird training, an updated Environmental Protection Agency screening tool for environmental justice analysis, and contributions by our summer interns. Addthis Related Articles DOE Issues 86th Lessons Learned

  10. DOE Issues WIPP Radiological Release Investigation Report | Department of

    Office of Environmental Management (EM)

    Department of Energy Issues Request for Information on Hydrogen Infrastructure RD&D DOE Issues Request for Information on Hydrogen Infrastructure RD&D July 28, 2016 - 11:41am Addthis The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office (FCTO) has issued a request for information (RFI) to obtain feedback from stakeholders regarding deployment of hydrogen fueling stations, delivery infrastructure, and barriers and activities to pursue in both the near and longer term.

  11. DOE Has Issued Request for Information Regarding Hydrogen Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and FCEVs | Department of Energy Has Issued Request for Information Regarding Hydrogen Infrastructure and FCEVs DOE Has Issued Request for Information Regarding Hydrogen Infrastructure and FCEVs December 18, 2013 - 12:00am Addthis The U.S. Department of Energy's (DOE) Fuel Cell Technologies Office has issued a request for information (RFI) seeking feedback from interested stakeholders regarding strategies for a robust market introduction of hydrogen supply, infrastructure, and fuel cell

  12. Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation

    Broader source: Energy.gov [DOE]

    In support of the Administration’s all-of-the-above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or sequester greenhouse gases.

  13. Issues related to EM management of DOE spent nuclear fuel

    SciTech Connect (OSTI)

    Abbott, D.G.; Abashian, M.S.; Chakraborti, S.; Roberson, K.; Meloin, J.M.

    1993-07-01

    This document is a summary of the important issues involved in managing spent nuclear fuel (SNF) owned by the Department of Energy (DOE). Issues related to civilian SNF activities are not discussed. DOE-owned SNF is stored primarily at the Hanford Site, Idaho National Engineering Laboratory (INEL), Savannah River Site (SRS), Oak Ridge National Laboratory (ORNL), and West Valley Demonstration Project. Smaller quantities of SNF are stored at Brookhaven National Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory (LANL). There is a wide variety of fuel types, including both low and high enrichment fuels from weapons production, DOE reactors, research and development programs, naval programs, and universities. Most fuel is stored in pools associated with reactor or reprocessing facilities. Smaller quantities are in dry storage. Physical conditions of the fuel range from excellent to poor or severely damaged. An issue is defined as an important question that must be answered or decision that must be made on a topic or subject relevant to achieving the complimentary objectives of (a) storing SNF in compliance with applicable regulations and orders until it can be disposed, and (b) safely disposing of DOE`s SNF. The purpose of this document is to define the issues; no recommendations are made on resolutions. As DOE`s national SNF management program is implemented, a system of issues identification, documentation, tracking, and resolution will be implemented. This document is an initial effort at issues identification. The first section of this document is an overview of issues that are common to several or all DOE facilities that manage SNF. The common issues are organized according to specific aspects of spent fuel management. This is followed by discussions of management issues that apply specifically to individual DOE facilities. The last section provides literature references.

  14. DOE Issues Final RFP for Idaho Cleanup Project Core

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  15. EA-2019: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Draft Environmental Assessment EA-2019: Draft Environmental Assessment Lake Erie Connector Project DOE issued a Draft EA that evaluates the potential environmental impacts of issuing a Presidential permit for a new, 72-mile long, 1,000 megawatt, high-voltage direct current, electric transmission system that would cross the international border with Canada in Lake Erie and connect to the proposed Erie Converter Station in Conneaut Township, Pennsylvania. For more information on this project,

  16. DOE Issues Request for Information on Fuel Cells for Continuous...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On-Board Recharging for Battery Electric Light-Duty Vehicles DOE Issues Request for Information on Fuel Cells for Continuous On-Board Recharging for Battery Electric Light-Duty ...

  17. DOE Issues Final Environmental Impact Statement for Disposal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, ...

  18. DOE Issues Request for Information on Hydrogen Storage for Onboard...

    Office of Environmental Management (EM)

    Hydrogen Storage for Onboard Vehicle Applications DOE Issues Request for Information on Hydrogen Storage for Onboard Vehicle Applications June 7, 2016 - 3:07pm Addthis The U.S. ...

  19. DOE Issues RFP for Waste Treatment Services | Department of Energy

    Office of Environmental Management (EM)

    Greater-Than-Class C Waste | Department of Energy Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term

  20. DOE issues Finding of No Significant Impact for the Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory | Department of Energy DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory February 28, 2014 -

  1. DOE Issues Request for Information on Advanced Thermal Insulation and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Composite Material Compatibility | Department of Energy Advanced Thermal Insulation and Composite Material Compatibility DOE Issues Request for Information on Advanced Thermal Insulation and Composite Material Compatibility October 20, 2015 - 9:58am Addthis The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office has issued a request for information (RFI) to obtain feedback and opinions from industry, academia, research laboratories, government agencies, and other stakeholders

  2. DOE Issues Request for Information on Hydrogen Contamination Detectors |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hydrogen Contamination Detectors DOE Issues Request for Information on Hydrogen Contamination Detectors April 22, 2014 - 2:00pm Addthis The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office has issued a request for information (RFI) seeking feedback from interested stakeholders on existing and potential hydrogen contamination detectors (HCDs) and related factors such as performance characteristics, system integration requirements, costs, deployment

  3. DOE Issues Final Environmental Impact Statement for Moab, Utah Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its final environmental impact statement (EIS) for the Moab Uranium Mill Tailings Remedial Action Project Site, located on the bank of the Colorado River. The EIS details the preferred option of removal of the tailings pile and contaminated materials, along

  4. DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Support Services | Department of Energy Portsmouth Gaseous Diffusion Plant Support Services DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services December 9, 2014 - 3:37pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion

  5. DOE Issues Salt Waste Determination for the Savannah River Site |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued the waste determination for the treatment and stabilization of low activity salt-waste at the Savannah River Site allowing for significant reductions in environmental and health risks posed by the material. Stored in forty-nine underground tanks,

  6. DOE LABORATORY OPEN SOURCE SOFTWARE: ADVANCE DOE PROGRAM Approval and other oss Licensing Issues

    Broader source: Energy.gov [DOE]

    On Feb 1, 2002, DOE Patent Counsel issued an IPI-II-1-01 for "Development and Use of Open Source Software."

  7. EIS-0447: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0447: Draft Environmental Impact Statement DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to ...

  8. EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  9. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

  10. Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation

    Broader source: Energy.gov [DOE]

    In support of the Administration’s all-of-the-above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or sequester greenhouse gases. When finalized, the solicitation is expected to make as much as $4 billion in loan guarantees available to help commercialize technologies that may be unable to obtain full commercial financing.

  11. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the

  12. DOE Issues Request for Information for Los Alamos National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Legacy Completion Cleanup Project Post Fiscal Year 2016 Acquisition Planning | Department of Energy Los Alamos National Laboratory Legacy Completion Cleanup Project Post Fiscal Year 2016 Acquisition Planning DOE Issues Request for Information for Los Alamos National Laboratory Legacy Completion Cleanup Project Post Fiscal Year 2016 Acquisition Planning February 26, 2015 - 11:42am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department

  13. DOE issues Finding of No Significant Impact for the Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory Tim Jackson, (208) 526-8484 For Immediate Release: February 28, 2014 DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory The U.S. Department of Energy (DOE) has determined that resuming transient testing of nuclear fuels and materials at Idaho National Laboratory (INL)

  14. DOE Issues Final Environmental Impact Statement for Disposal of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greater-Than-Class C Waste | Department of Energy Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term management of

  15. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment on Road Project U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship

  16. DOE issues Finding of No Significant Impact for the Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory | Department of Energy issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory February 28, 2014 - 12:00pm

  17. DOE Issues Noncompliance Notices for Three Showerhead Models | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Noncompliance Notices for Three Showerhead Models DOE Issues Noncompliance Notices for Three Showerhead Models October 4, 2011 - 4:02pm Addthis The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determination this week to three companies regarding showerheads that violate federal water conservation standards. The federal standard enacted by Congress limits showerhead water consumption to no more than 2.5 gallons per minute. Watermark Designs'

  18. EA-1948: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile ...

  19. Second Draft - DOE O 251.1D, Departmental Directives Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The order establishes directives as the primary means to set, communicate, and institutionalize policies, requirements, responsibilities, and procedures for Departmental elements and contractors. The second draft is submitted owing to extensive revisions to the first draft.

  20. Microsoft Word - NR DRAFT RFP WIPP M&O APR 1 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 1, 2011 william.taylor@emcbc.doe.gov DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant Cincinnati -- The U.S....

  1. EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings Complex Transformation The Draft Complex Transformation SPEIS analyzes the potential...

  2. Draft Advice for the Hanford Facility Dangerous Waste Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue Managers Working Draft Page 1 of 19 Draft Advice for the Hanford Facility Dangerous Waste Permit (Site-Wide Permit) Background: The Draft Hanford Facility Dangerous Waste Permit for the Treatment, Storage, and Disposal of Dangerous Waste (Permit) is the Washington State Department of Ecology's (Ecology) tool for regulating hazardous waste at Hanford. The Permit(s) establish conditions that the U.S. Department of Energy (DOE) and its contractors must meet to protect human health and the

  3. EIS-0491: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0491: EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana The Environmental Protection Agency issued a notice of availability of a Draft EIS prepared by the Federal Energy Regulatory Commission (with DOE as a cooperating agency) that analyzes the potential environmental impacts of a proposal to construct and

  4. EIS-0487: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0487: Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and associated facilities in Brazoria County, Texas, to

  5. EIS-0492: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0492: Draft Environmental Impact Statement Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA) Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Draft EIS that analyzes the potential environmental impacts of the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. For more information on this project, see the project page:

  6. EIS-0493: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0493: Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas; a marine berth connecting the terminal to the adjacent La Quinta Channel; and an

  7. DOE Order - Draft DOE O 426.1, Federal Technical Capability

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Qualification Card. S S r u E . p x T e p e r e c v r h i t n s B i o a c r s ... The DOE Scholars Program offers flexibility to meet varied mission needs and mobility for ...

  8. Draft Supplement Analysis for Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE'S Inventory of Depleted Uranium Hexafluoride

    Office of Environmental Management (EM)

    DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED URANIUM OXIDE CONVERSION PRODUCT GENERATED FROM DOE'S INVENTORY OF DEPLETED URANIUM HEXAFLUORIDE (DOE/EIS-0359-SA1 AND DOE/EIS-0360-SA1) March 2007 March 2007 i CONTENTS NOTATION........................................................................................................................... iv 1 INTRODUCTION AND BACKGROUND ................................................................. 1 1.1 Why DOE Has Prepared This

  9. EIS-0453: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0453: Draft Environmental Impact Statement ... Laboratory DOE prepared this Draft EIS to evaluate the potential environmental ...

  10. EIS-0486: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the ...

  11. EA-1984: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1984: Draft Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory, Idaho DOE has prepared a draft EA to...

  12. Microsoft Word - GJPPGPracticesDraft.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GJPPGPracticesDraft.doc Microsoft Word - GJPPGPracticesDraft.doc PDF icon Microsoft Word - GJPPGPracticesDraft.doc More Documents & Publications 1 DOE Purchase Card Policy Natural ...

  13. DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Process | Department of Energy Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process September 2, 2010 - 4:46pm Addthis Today, the Department of Energy announced a Notice of Proposed Rulemaking seeking comment on proposed reforms designed to improve its energy efficiency certification and enforcement regulations. "This rulemaking a key step in the Department's

  14. DRAFT - DOE G 413.3-15, Department of Energy Guide for Project Execution Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  15. EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a...

  16. EIS-0496: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San ... and state lead agencies, issued a draft EISEnvironmental Impact Report that assesses ...

  17. EA-1979: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1979: Draft Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a draft EA that ...

  18. EA-1891: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft EA to ...

  19. EA-1966: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1966: Draft Environmental Assessment Sunflower Wind Project, Hebron, North Dakota Western Area Power Administration issued a Draft EA that...

  20. DRAFT Letter, PW 1/3/6 RD/RA Work Plan 1/19/16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Letter, PW 1/3/6 RD/RA Work Plan 1/19/16 RAP Committee: Draft Letter: Remedial Design/Remedial Action (RD/RA) Work Plan for the 200-CW-5, 200- PW-1, PW-3, PW-6 Operable Units, DOE/RL-2015-23 (Draft B). Page 1 of 1 Draft HAB Letter: Remedial Design/Remedial Action (RD/RA) Work Plan for the 200- CW-5, 200-PW-1, PW-3, PW-6 Operable Units, DOE/RL-2015-23 (Draft B). Issue Managers: Engstrom, Hudson, Niles, Cimon, Mattson To: Stacy and Dennis Cc: Ecology and DOE HQ (Monica), Bertrand Recognizing that

  1. DOE - NNSA/NSO -- SiteLines - Issue 144

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SITEMAP SEARCH CONTACT US ABOUT US HELP ACRONYMS FOIA PRIVACY ACT WEBSITE POLICIES HOMEPAGE Home > Library > SiteLines U.S. DOE/NNSA - Nevada Site Office July/August 2010 - Issue 144 A publication for all members of the NNSA/NSO family RNCTEC One Year Later: Mission Growth and Expansion It was one year ago that the National Nuclear Security Administration/ Nevada Site Office (NNSA/NSO) completed the start-up of the Radiological/Nuclear Countermeasures Test and Evaluation Complex (RNCTEC)

  2. Second Draft - DOE O 461.1C, Packaging and Transportation for Offsite Shipment of Materials of National Security Interests

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order establishes requirements and responsibilities for ensuring the safety of packaging and transportation for offsite shipments of Materials of National Security Interest. DOE Order 461.1C received a significant number of major and suggested comments the first time it was reviewed in RevCom. As a result of the number of comments received, the OPI have a second RevCom review. This revision of DOE O 461.1C incorporates changes which resulted from the comment resolution process of the initial draft.

  3. DOE to Issue Second Solicitation for Purchase of Crude Oil for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve DOE to Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve ...

  4. EIS-0372: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or

  5. Microsoft Word - DRAFT_DOE_EVMSIH_V2.0 05232016

    Office of Environmental Management (EM)

    DRAFT CRB Interview Guidance.doc Microsoft Word - DRAFT CRB Interview Guidance.doc More Documents & Publications Microsoft Word - ARRAAttachment12v1.doc Microsoft Word - ARRAGuideAttachment10v1.doc Microsoft Word - Document2

    Ingersoll Rand Comments Smart Grid RFI: Addressing Policy and Logistical Challenges Definition and Scope The deployment of technology to make the nation's electric grid a more interactive, efficient and responsive system is already underway. At the early stages of any

  6. DRAFT DRAFT DRAFT ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to prioritize cleanup along the Columbia River corridor. DOE should complete this work as expeditiously as possible and achieve a standard of unrestricted use throughout...

  7. DRAFT DRAFT DRAFT ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE should complete this work as expeditiously as possible and achieve a standard of unrestricted use throughout the River Corridor. Protect and restore the groundwater The ...

  8. DRAFT DRAFT DRAFT ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE should complete this work as expeditiously as possible and achieve a standard of unrestricted use throughout the River Corridor. Protect and restore the groundwater * The ...

  9. EIS-0526: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0526: EPA Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana EPA issued a notice of availability for a Draft EIS, prepared by the U.S. Army Corps of Engineers and the Bureau of Reclamation as joint lead agencies, for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  10. EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy USACE and BOR Notice of Availability of the Draft Environmental Impact Statement EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana The U.S. Army Corps of Engineers and the Bureau of Reclamation jointly issued a notice of availability for a Draft EIS for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  11. Draft Advice (v2): Vapor Exposure Issues on Worker Health and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    over the past 20 years. DOE should use this data as a basis for an appropriately designed epidemiological study of long- term health effects from chemical vapor exposures, as...

  12. 2/10/14: Preliminary issue manager discussion draft (Vanni); path forward TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major Concerns (in no particular order): 1. Interim Status Standards & the RCRA Permit: All modification documents support DOE's continued RCRA operations under Interim Status Standards despite violations of WAC 173-303-400 and -805 requirements. Possible advice points: The Board advises DOE and Ecology that TSD operations under interim status standards should cease; all RCRA TSD units should be subject to RCRA final status operating standards and the piecemeal approach to permitting on the

  13. O:\IM-20\E-Government Program Office\FDMS\FDMS database\DOE\2011\DOE-HQ-2011-0014 - Daniel Cohen - GC\Comments from FDMS\Dan Manole DRAFT-0004.html

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14%20-%20Daniel%20Cohen%20-%20GC/Comments%20from%20FDMS/Dan%20Manole%20DRAFT-0004.html[3/23/2011 2:21:55 PM] PUBLIC SUBMISSION As of: March 23, 2011 Received: March 21, 2011 Status: Pending_Post Tracking No. 80c0d039 Comments Due: April 04, 2011 Submission Type: Web Docket: DOE-HQ-2011-0014 Reducing Regulatory Burden Comment On: DOE-HQ-2011-0014-0001 Reducing Regulatory Burden Document: DOE-HQ-2011-0014-DRAFT-0004 Comment on FR Doc # 2011-02368 Submitter Information Name: Dan Manole Address:

  14. DOE Issues Request for Information on Hydrogen Infrastructure RD&D |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE Issues Request for Information on Hydrogen Infrastructure RD&D DOE Issues Request for Information on Hydrogen Infrastructure RD&D July 28, 2016 - 11:41am Addthis The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office (FCTO) has issued a request for information (RFI) to obtain feedback from stakeholders regarding deployment of hydrogen fueling stations, delivery infrastructure, and barriers and activities to pursue in both the near and longer

  15. DOE General Counsel Issues Arbitration Guidance for M&O Contractors |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors (February 3, 2010) Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include binding arbitration in their contracts with

  16. Listing of DOE/FE Authorizations Issued in 2014 | Department...

    Energy Savers [EERE]

    Issued in 2014 The following chart contains all Orders issued by the Office of Natural Gas Regulatory Activities in 2014 thru December 31st. The orders include all new...

  17. 2/10/14: Preliminary issue manager discussion draft (Vanni); path forward TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RE: Class 3 Modifications to the Hanford Site RCRA Permit for the Low-Level Burial Grounds Trenches 31, 34 and 94, the Central Waste Complex and Waste Receiving and Processing Facility (CWC-WRAP) and the T-Plant Complex (T-Plant). These modifications to the Hanford RCRA Permit Rev. 8C are in part the result of actions required by the Consent Agreement and Final Order (CAFO-No. RCRA-10-2013-0113) executed by the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA)

  18. DOE Issues Guidance for "Other Transactions" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for "Other Transactions" DOE Issues Guidance for "Other Transactions" November 15, 2005 - 12:42pm Addthis Provides Opportunity for Increased Industry Research Partnerships WASHINGTON, DC - On November 7, 2005, the Department of Energy (DOE) issued an interim final rule for the establishment of policies and procedures for a new "other transaction" authority. This authority allows DOE to remove barriers to commercial firms' participation in some of DOE's

  19. DOE Issues Request for Information on Gas Clean-Up for Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office has issued a request for information (RFI) to obtain feedback and opinions from industry, academia, research ...

  20. DOE Issues Sources Sought/Request for Information for Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sources SoughtRequest for Information for Oak Ridge Office of Environmental Management Technical Support Services DOE Issues Sources SoughtRequest for Information for Oak Ridge ...

  1. DOE Issues Final Request for Proposals for the West Valley Demonstrati...

    Energy Savers [EERE]

    Valley Demonstration Project Supplemental Environmental Impact Statement Support Service DOE Issues Final Request for Proposals for the West Valley Demonstration Project ...

  2. DOE to Issue Second Solicitation for Purchase of Crude Oil for the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Petroleum Reserve | Department of Energy Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve DOE to Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve April 18, 2007 - 12:36pm Addthis Solicitation Issued for Up to Four Million Barrels WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it has issued the second of several solicitations planned to purchase up to four million barrels of

  3. Regulatory analysis for the resolution of Unresolved Safety Issue A-44, Station Blackout. Draft report

    SciTech Connect (OSTI)

    Rubin, A.M.

    1986-01-01

    ''Station Blackout'' is the complete loss of alternating current (ac) electric power to the essential and nonessential buses in a nuclear power plant; it results when both offsite power and the onsite emergency ac power systems are unavailable. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on ac power, the consequences of a station blackout could be severe. Because of the concern about the frequency of loss of offsite power, the number of failures of emergency diesel generators, and the potentially severe consequences of a loss of all ac power, ''Station Blackout'' was designated as Unresolved Safety Issue (USI) A-44. This report presents the regulatory analysis for USI A-44. It includes: (1) a summary of the issue, (2) the proposed technical resolution, (3) alternative resolutions considered by the Nuclear Regulatory Commission (NRC) staff, (4) an assessment of the benefits and costs of the recommended resolution, (5) the decision rationale, and (6) the relationship between USI A-44 and other NRC programs and requirements.

  4. DOE/EIS-0373D; Draft Environmental Impact Statement for the Proposed...

    Broader source: Energy.gov (indexed) [DOE]

    and Technology's Website (http:consolidationeis.doe.gov) for viewing and downloading. ... Infrastructure Test Range Complex DOE U.S. Department of Energy EA ...

  5. DOE Has Issued Request for Information Regarding Hydrogen Infrastructu...

    Broader source: Energy.gov (indexed) [DOE]

    This input will augment financing strategies that DOE analyzes for public deployment of infrastructure for supporting FCEV introduction in U.S. markets. Such financing strategies ...

  6. Deadline Extended: DOE Issues Request for Information on Automotive...

    Energy Savers [EERE]

    Fuel Cells and Hydrogen Refueling April 4, 2016 - ... The U.S. Department of Energy's (DOE's) Fuel Cell Technologies ... performance and reduce cost of bipolar plates for ...

  7. DOE Issues Request for Information on Biological Hydrogen Production

    Broader source: Energy.gov [DOE]

    The Fuel Cell Technologies Office has issued a request for information seeking feedback from interested stakeholders regarding biological hydrogen production research and development.

  8. DOE Issues Two Notices Seeking Comment on the Implementation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    First, the Department issued a Request for Information seeking information and data related to the use of computer simulations, mathematical methods, and other alternative methods ...

  9. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  10. DOE Issues Proposed Coverage Determination for Hearth Products

    Broader source: Energy.gov [DOE]