1

DOE Issues Draft Request for Proposals for Hanford Site Occupational  

Broader source: Energy.gov (indexed) [DOE]

Issues Draft Request for Proposals for Hanford Site Issues Draft Request for Proposals for Hanford Site Occupational Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce DOE Issues Draft Request for Proposals for Hanford Site Occupational Medical Services - Agency Solicits Input from Industry, Stakeholders, and Workforce July 19, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE Geoffrey.Tyree@rl..doe.gov 509-376-4171 The Department of Energy today issued a Draft Request for Proposals (RFP) for an Occupational Medical Services acquisition at the Hanford Site in southeastern Washington State. The Draft RFP is one step in the process toward awarding a contract and provides an opportunity for companies, Hanford stakeholders, and the site's workforce to provide input on the Draft RFP. DOE will provide

2

DOE Issues Draft Request for Proposals Seeking Contractor to Manage,  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Draft Request for Proposals Seeking Contractor to DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant April 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP)seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million per year, for five years, with an option to extend the contract for an additional five years. DOE anticipates awarding a competitive, cost-plusaward-fee

3

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Broader source: Energy.gov (indexed) [DOE]

Issues Two Draft National Interest Electric Transmission Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations April 26, 2007 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors. "These draft designations set us on the path to modernize our constrained and congested electric power infrastructure. They are a crucial step toward realizing President Bush's goal of a modern, more efficient electric

4

DOE Issues Draft RFP for Waste Treatment Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for Low-Level Waste (LLW) and Mixed-Low Level Waste (MLLW) treatment services that may result in the issuance of one or more Basic Ordering Agreements (BOAs).

5

DOE Issues Draft RFP for Idaho Cleanup Project Core | Department...  

Office of Environmental Management (EM)

on the Draft RFP is available at: https:www.emcbc.doe.govSEBICPCOREindex.php. DOE has requested that all comments, questions, suggested changes, and feedback should...

6

DOE Issues Draft Request for Proposals for Services at Carlsbad New Mexico  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for a technical assistance contract acquisition at the Carlsbad Field Office in New Mexico.

7

DOE Issues Two Draft National Interest Electric Transmission...  

Broader source: Energy.gov (indexed) [DOE]

and national demand, which includes more local generation, transmission capacity, demand response, and energy efficiency measures. DOE is not directing the construction of new...

8

Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment |  

Broader source: Energy.gov (indexed) [DOE]

Uranium Leasing Program Draft Programmatic EIS Issued for Public Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment March 15, 2013 - 11:08am Addthis Uranium Leasing Program Draft Programmatic EIS Issued for Public Comment DOE has issued the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)(DOE/EIS-0472D) for public review and comment. The document is available here and on the ULP PEIS website. Under the Uranium Leasing Program, the DOE Office of Legacy Management administers 31 tracts of land in Mesa, Montrose, and San Miguel counties that are leased to private entities to mine uranium and vanadium. The program covers an area of approximately 25,000 acres. No mining operations are active on the ULP lands at this time. DOE is preparing the ULP PEIS to

9

Department of Energy Issues Draft Renewable Energy and Efficient...  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy...

10

Department of Energy Issues Draft Loan Guarantee Solicitation...  

Broader source: Energy.gov (indexed) [DOE]

Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects...

11

Department of Energy Issues Draft Request for Proposals for Argonne  

Broader source: Energy.gov (indexed) [DOE]

Draft Request for Proposals for Argonne Draft Request for Proposals for Argonne National Laboratory Contractor Department of Energy Issues Draft Request for Proposals for Argonne National Laboratory Contractor January 3, 2006 - 9:06am Addthis WASHINGTON, DC -- The Department of Energy (DOE) is seeking comments on a draft Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor for Argonne National Laboratory (ANL), a major DOE Office of Science research facility located near Chicago, Ill. This competition for a laboratory contractor is the first in the history of the lab. ANL is a multiprogram laboratory, funded at approximately $492 million annually by the Office of Science (SC), other DOE programs, as well as other government agencies and private industry. Argonne was chartered in

12

CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...  

Office of Environmental Management (EM)

Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of...

13

Department of Energy Issues Draft Renewable Energy and Efficient...  

Broader source: Energy.gov (indexed) [DOE]

Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects...

14

EIS-0423: DOE Notice of Availability of the Draft Environmental...  

Office of Environmental Management (EM)

Draft Environmental Impact Statement and Notice of Public Hearings EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings...

15

DOE Media Advisory - DOE extends public comment period on Draft  

Broader source: Energy.gov (indexed) [DOE]

Media Advisory - DOE extends public comment period on Draft Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site DOE Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site October 13, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy's Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for

16

EIS-0357: DOE Notice of Availability of the Supplement to the Draft  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Supplement to the Draft DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement EIS-0357: DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft Environmental Impact Statement (EIS) issued in December 2005. This Supplement corrects information regarding carbon dioxide (CO2) emissions from the proposed Gilberton plant, provides information on the feasibility of carbon sequestration for the CO2 emissions from the Gilberton plant, and presents

17

Energy Department Issues Draft Request for Proposals for Operation of its  

Broader source: Energy.gov (indexed) [DOE]

Draft Request for Proposals for Operation Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington October 25, 2007 - 3:45pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage and operate DOE's Pacific Northwest National Laboratory (PNNL). PNNL is a world-class multi-program national laboratory located in Richland, Washington, whose mission is to deliver science-based solutions for the nation's energy, environmental, and security needs. The draft RFP's Statement of Work highlights the type of work being

18

Energy Department Issues Draft Request for Proposals for Operation of its  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Issues Draft Request for Proposals for Operation of its Pacific Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.25.07 Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage and operate DOE's Pacific

19

EIS-0439: DOE Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and...

20

EIS-0472: DOE Notice of Availability of a Draft Programmatic...  

Energy Savers [EERE]

Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the availability of a Draft Programmatic Environmental Impact Statement...

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0375: DOE Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Department of Energy,...

22

DOE Issues Final RFP for Hanford Site Lab Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab. A Draft RFP was previously released on February 28, 2014, requesting comments from industry.

23

DOE Announces Additional Public Comment Meetings for Draft National  

Broader source: Energy.gov (indexed) [DOE]

DOE Announces Additional Public Comment Meetings for Draft National DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations, May 8, 2007. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations, May 8, 2007. The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007. The four additional meetings will be held in June in: Phoenix, Arizona; Las Vegas, Nevada; Pittsburgh, Pennsylvania; and Rochester, New York. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations, May 8, 2007. More Documents & Publications DOE Affirms National Interest Electric Transmission Corridor Designations

24

EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental...  

Energy Savers [EERE]

DOE Notice of Availability of the Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings EIS-0236-S4: DOE Notice of Availability of the Draft...

25

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...  

Energy Savers [EERE]

DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement...

26

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0447: DOE Notice of Availability of Draft Environmental Impact EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

27

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Notice of Availability of Draft Environmental Impact DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

28

Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement  

Broader source: Energy.gov [DOE]

Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

29

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...  

Office of Environmental Management (EM)

Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft Long-Term Management...

30

DOE Announces Additional Public Comment Meetings for Draft National  

Broader source: Energy.gov (indexed) [DOE]

Announces Additional Public Comment Meetings for Draft National Announces Additional Public Comment Meetings for Draft National Corridor Designations DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations May 8, 2007 - 11:00am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007. The four additional meetings will be held in June in: Phoenix, Arizona; Las Vegas, Nevada; Pittsburgh, Pennsylvania; and Rochester, New York. Dates and locations will be published in the Federal Register in the coming days. DOE previously announced it would host three public meetings at the

31

DOE/EA-1697 Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment for Right-of-Way Maintenance in the San Joaquin Valley, California June 2010 Prepared for: Western Area Power Administration, Sierra Nevada Region San Joaquin Valley ROW Maintenance EA June 2010 iii Draft EA CONTENTS 1.0 PURPOSE AND NEED FOR ACTION ...................................................................... 1-1 1.1 Introduction ............................................................................................. 1-1 1.2 Background ............................................................................................. 1-1 1.3 Purpose and Need for Action .................................................................. 1-3 1.4 Location and Project Area Description .................................................... 1-4

32

NETL: News Release - DOE Releases Draft Funding Opportunity Announcement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 4, 2007 October 4, 2007 DOE Releases Draft Funding Opportunity Announcement for CCPI Round 3 Washington, DC - The U.S. Department of Energy has released for public comment the draft Funding Opportunity Announcement (FOA), Model Cooperative Agreement, and Model Payment Agreement for Round 3 of the Clean Coal Power Initiative (CCPI). CCPI invites private industries to partner with Government to demonstrate new clean coal technologies at commercial scale. MORE INFO Read the Draft FOA Register for the Public Workshop [beginning 10.05.07] The draft FOA allows interested parties to voice concerns and seek answers to questions regarding the cost-shared partnership. The public comment period begins immediately and continues through November 9, 2007. In addition, a public meeting will be held on November 1, 2007, at the Hyatt

33

DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S  

Broader source: Energy.gov (indexed) [DOE]

03 03 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 i September 2013 ACRONYMS AND ABBREVIATIONS BMPs best management practices CEQ Council on Environmental Quality CFR Code of Federal Regulations DASR digital airport surveillance radar dB decibel dBA decibel A-weighted

34

EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmen...  

Office of Environmental Management (EM)

DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12...

35

EIS-0507: Draft Environmental Impact Statement | Department of...  

Energy Savers [EERE]

7: Draft Environmental Impact Statement EIS-0507: Draft Environmental Impact Statement The Bureau of Land Management and the U.S. Forest Service issued, with DOE's Bonneville Power...

36

DOE Draft Standard, Development and Use of Probabilistic Risk Assessments  

Broader source: Energy.gov (indexed) [DOE]

Draft Standard, Development and Use of Probabilistic Risk Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 12/10 DOE Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 12/10 The Department has taken several actions to provide an infrastructure for providing appropriate controls and support for use of risk assessments and risk informed decision making as it applies to nuclear safety including establishing a Risk Assessment Technical Experts Working Group, revising its Nuclear Safety Policy to explicitly address the use and control of risk assessments, and developing this DOE Technical Standard for Control and Use of Probabilistic Risk Assessment for interim use and comment.1

37

DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions  

Broader source: Energy.gov (indexed) [DOE]

Releases Draft Strategic Plan for Reducing Greenhouse Gas Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology September 22, 2005 - 10:45am Addthis WASHINGTON, DC - The Department of Energy today released for public review and comment a plan for accelerating the development and reducing the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions - the technology component of a comprehensive U.S. approach to climate change. The technologies developed under the Climate Change Technology program will be used and deployed among the United States' partners in the Asia-Pacific Partnership for Clean Development that was announced earlier this year.

38

DOE Issues Environmental Assessment on Road Project for Public Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

39

EA-1792: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Assessment EA-1792: DOE Notice of Availability of the Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This draft EA to evaluate and describe the potential environmental impacts associated with the: University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine. Notice of Availability of the Draft Environmental Assessment for the University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine, DOE/EA-1792 (June 2011) More Documents & Publications EA-1792: DOE Notice of Availability of the Environmental Assessment and Finding of No Significant Impact

40

EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Supplemental DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition The U. S. Department of Energy (DOE) announces the availability of the Draft Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS; DOE/EIS-0283-S2) for public comment. DOE also is announcing the dates, times and locations for pulic hearings to receive comments on the Draft SPD Supplemental EIS. The Draft SPD Supplemental EIS analyzes the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

HAB Advice and Issue Tracking Process for Draft RCRA Site-Wide...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advice and Issue Tracking Process for Draft RCRA Site-Wide Permit Comment Period Last updated 5812 Introduction: The following document is a living document intended to be...

42

EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis |  

Broader source: Energy.gov (indexed) [DOE]

60: DOE Notice of Availability of the Draft Supplement 60: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, Clive, Utah The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low- level radioactive waste disposal facility at the Nevada Test Site (NTS) or at EnergySolutions LLC, a commercial low-level waste disposal facility in Clive, Utah (EnergySolutions; formerly known as Envirocare of Utah, Inc.). DOE/EIS-0360, Department of Energy, Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride,

43

EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis |  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Supplement DOE Notice of Availability of the Draft Supplement Analysis EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low-level radioactive waste disposal facility at the Nevada Test Site (NTS) or at EnergySolutions LLC, a commercial low-level waste disposal facility in Clive, Utah (EnergySolutions; formerly known as Envirocare of Utah, Inc.). DOE/EIS-0359, Department of Energy, Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, 72

44

EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management The Department of Energy (DOE) announces the availability of the Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility(NIF) Project Specific Analysis portion (Volume III, Appendix I) of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS) DOE/EIS-0236-S1 for public review and comment. EIS-0236-S1-NOA_DEIS-1999.pdf More Documents & Publications EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

45

EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Site-Wide DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a separately-organized agency within the Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security Complex (Draft Y-12 SWEIS, DOE/EIS-0387) (74 FR 56189) (October 2009) National Nuclear Security Administration Notice of Availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security Complex, EIS-0387(October 2009) More Documents & Publications EIS-0387: Record of Decision

46

EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3-S1: DOE Notice of Availability of a Draft Supplemental 3-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement (Mercury Storage SEIS, DOE/EIS-0423-S1) for public comment. As required by the Mercury Export Ban Act of 2008, DOE plans to identify a facility or facilities for the long-term management and storage of elemental mercury generated in the U.S. Subsequently, DOE identified three additional, reasonable alternative locations in the vicinity of its Waste Isolation

47

EIS-0350: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico U.S. Department of Energy (DOE), announces the availability of the Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico (the Draft CMRR EIS), and the dates and locations for the public hearings to receive comments on the Draft CMRR EIS. The present Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL) houses mission critical analytical chemistry, material

48

Why did DOE issue a DEC  

Broader source: Energy.gov (indexed) [DOE]

did DOE issue a DEC? did DOE issue a DEC? DOE issued the DEC to more effectively promote U.S. manufacturing of new technologies developed under certain DOE funding agreements (e.g. cooperative agreements), a key objective of the Bayh-Dole Act. What does the DEC do? It allows DOE to require all applicants, regardless of type, to submit U.S. manufacturing plans, use U.S. manufacturing plans to evaluate and select applications, and ensure compliance of U.S. manufacturing plans. What is a U.S. manufacturing plan? A U.S. manufacturing plan is an applicant's measurable commitment to support U.S. manufacturing of the technologies related to their DOE funding agreement. The range of commitment may include, for example, manufacturing certain products in the U.S., investing in U.S. facilities or a licensing strategy

49

EIS-0336: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement'' (DOE/EIS-0336) for public review and comment. DOE/EIS-0336, Department of Energy, Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line, 68 FR 51569 (August 2003) More Documents & Publications EIS-0336: Final Environmental Impact Statement

50

DOE Issues Noncompliance Notices | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Noncompliance Notices DOE Issues Noncompliance Notices DOE Issues Noncompliance Notices November 1, 2011 - 12:23pm Addthis The U.S. Department of Energy's Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070, which is manufactured in China. DOE tested four units of the freezer and determined that the units consumed energy at the rates of 363, 341, 352, and 387 kWh/yr, exceeding the federal limit by an average of 32 percent. The Office of Enforcement also issued a Notice of Noncompliance Determination to Goodman Manufacturing regarding commercial package central air conditioner model CPC180XXX3BXXXAA. The federal energy conservation standard requires that commercial package central air conditioners operate

51

EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Site-Wide DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada The National Nuclear Security Administration (NNSA), a separately organized semi-autonomous agency within the U.S. Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (Draft SWEIS, DOE/EIS-0426D) for public review, as well as the locations, dates and

52

EIS-0403: DOE and BLM Notice of Availability of the Draft Programmatic  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft Programmatic Environmental Impact Statement EIS-0403: DOE and BLM Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The Bureau of Land Management (BLM) and the Department of Energy (DOE) (the Agencies) as co-lead agencies announced the availability of the Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern States (BLM/DES 10-59, DOE/EIS-0403). (75 FR 78980, December 17, 2010) EIS-0403-DOE_BLM_NOA-2010.pdf More Documents & Publications EIS-0403-S1: DOE and BLM Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

53

EA-1773: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

3: DOE Notice of Availability of the Draft Environmental 3: DOE Notice of Availability of the Draft Environmental Assessment EA-1773: DOE Notice of Availability of the Draft Environmental Assessment Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the: Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Notice of Availability of the Draft Environmental Assessment for the Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida, DOE/EA-1773 (August 2010) More Documents & Publications EA-1772: Finding of No Significant Impact CX-001234: Categorical Exclusion Determination

54

EIS-0382: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN The draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of $36 million in cofunding, through a financial assistance cooperative agreement, for the design and one-year operational demonstration of a coal-based, Integrated Gasification Combined Cycle (IGCC) electric generating facility on the Iron Range of northern Minnesota. Notice of Availability of the Draft Environmental Impact Statement for the Mesaba Energy Project (DOE/EIS-0382D)(November 8, 2007)(72FR63169) More Documents & Publications

55

EIS-0460: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0460: DOE Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois DOE announces the availability of the Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) for public review and comment, as well as the date, location, and time for a public hearing. The draft environmental impact statement (EIS) analyzes the potential impacts associated with the FutureGen 2.0 Project (FutureGen 2.0), which would be designed, constructed, operated, and partially funded by the FutureGen Industrial Alliance, Inc. (Alliance). In addition to Alliance funding, FutureGen 2.0 may receive approximately $1 billion in federal

56

EIS-0357: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

7: DOE Notice of Availability of the Draft Environmental 7: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0357: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability of the document, Draft Environmental Impact Statement for the Gilberton Coal to-Clean Fuels and Power Project (DOE/EIS-0357), for public comment. The draft environmental impact statement (EIS) analyzes the potential environmental consequences of providing federal funding for the design, engineering, construction, and operation of the first power facility in the United States to use coal waste as feed to a gasification facility that subsequently generates fuel gas for clean power, thermal energy, and clean

57

EA-1773: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

EA-1773: DOE Notice of Availability of the Draft Environmental EA-1773: DOE Notice of Availability of the Draft Environmental Assessment EA-1773: DOE Notice of Availability of the Draft Environmental Assessment Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the: Commercial Scale Integrated Demonstration BioEnergy Center Vero Beach, Florida Notice of Availability of the Draft Environmental Assessment for the Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida, DOE/EA-1773 (August 2010) More Documents & Publications EA-1772: Finding of No Significant Impact CX-001234: Categorical Exclusion Determination

58

EA-1792-S1: DOE Notice of Availability of the Draft Supplemental  

Broader source: Energy.gov (indexed) [DOE]

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Finding of No Significant Impact

59

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

08: DOE Notice of Availability of a Programmatic Draft 08: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

60

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Notice of Availability of a Programmatic Draft DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental  

Broader source: Energy.gov (indexed) [DOE]

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor The Department of Energy (DOE or the Department) announces the availability of two draft National Environmental Policy Act (NEPA) documents related to its Yucca Mountain Project: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel

62

EIS-0414: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

4: DOE Notice of Availability of the Draft Environmental 4: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Energia Sierra Juarez U.S. Transmission Project (ESJ-U.S.), EIS-0414 (September 2010) More Documents & Publications Addressing Policy and Logistical Challenges to Smart Grid Implementation:

63

DOE Issues Noncompliance Notices | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Issues Noncompliance Notices Issues Noncompliance Notices DOE Issues Noncompliance Notices November 1, 2011 - 12:23pm Addthis The U.S. Department of Energy's Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070, which is manufactured in China. DOE tested four units of the freezer and determined that the units consumed energy at the rates of 363, 341, 352, and 387 kWh/yr, exceeding the federal limit by an average of 32 percent. The Office of Enforcement also issued a Notice of Noncompliance Determination to Goodman Manufacturing regarding commercial package central air conditioner model CPC180XXX3BXXXAA. The federal energy conservation standard requires that commercial package central air conditioners operate

64

EIS-0439: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

9: DOE Notice of Availability of the Draft Environmental 9: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and the Loan Guarantee Program (LGP), the California Energy Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact Statement (EIS) and Staff Assessment (SA), which may require a California Desert Conservation Area (CDCA) Plan Amendment, as a joint environmental analysis document for the proposed Rice Solar Energy Project (Project), in Riverside County, California, and by this notice are announcing the opening of the comment period. Western Area Power Administration Draft Environmental Impact

65

DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Access Policy - Version 1.0 User Access Policy - Version 1.0 DOE NSRC User Access Policy December 9, 2002 page 1 DRAFT General Policies and Procedures for User Access to the DOE Nanoscale Science Research Centers 1. Preamble The mission of the U.S. Department of Energy (DOE) Nanoscale Science Research Centers (NSRCs) is to support users in doing outstanding science in a safe environment. To this end, each Center must have: * An array of state-of-the-art equipment and laboratories for synthesis, fabrication, characterization, and simulation of nanoscale materials and structures * A skilled staff to support this equipment, users, and the associated science but above all * A user scientific program that provides leadership in nanoscale science and technology This document addresses the policies and procedures for user access to the NSRCs.

66

DOE Issues Energy Sector Cyber Organization NOI  

Broader source: Energy.gov (indexed) [DOE]

Issues National Energy Sector Cyber Organization Notice of Intent Issues National Energy Sector Cyber Organization Notice of Intent February 11, 2010 The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) announced on Jan. 7 that it intends to issue a Funding Opportunity Announcement (FOA) for a National Energy Sector Cyber Organization, envisioned as a partnership between the federal government and energy sector stakeholders to protect the bulk power electric grid and aid the integration of smart grid technology to enhance the security of the grid. The cyber organization is expected to have the knowledge, expertise, capabilities, and capacity, at a minimum to: * Identify and prioritize cyber security research and development issues.

67

DOE Extends Public Comment Period for the Draft Uranium Leasing Program  

Broader source: Energy.gov (indexed) [DOE]

the Draft Uranium Leasing the Draft Uranium Leasing Program Programmatic Environmental Impact Statement DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement June 3, 2013 - 3:05pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov May 29, 2013 DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to July 1, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in

68

EIS-0226: DOE Notice of Availability of the Revised Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

6: DOE Notice of Availability of the Revised Draft 6: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) and the New York State Energy Research and Development Authority (NYSERDA) are announcing their intent to prepare an Environmental Impact Statement (EIS) for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project (WVDP) and Western New York Nuclear Service Center (also known as the ''Center''). DOE/EIS-0226, Notice of Availability of the Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the

69

DOE Issues Funding Opportunity for Innovations to Increase Cybersecuri...  

Office of Environmental Management (EM)

DOE Issues Funding Opportunity for Innovations to Increase Cybersecurity for Energy Delivery Systems DOE Issues Funding Opportunity for Innovations to Increase Cybersecurity for...

70

EA-1566: DOE Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Assessment Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada This notice announces the availability, and the opportunity...

71

EIS-0458: DOE Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA Notice of Availability of the Draft Environmental Impact Statement and Public Hearing...

72

EIS-0414: DOE Notice of Availability of the Draft Environmental...  

Energy Savers [EERE]

of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of...

73

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

77: DOE Notice of Availability of the Draft Environmental 77: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power

74

DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013.

75

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Broader source: Energy.gov (indexed) [DOE]

8 8 U.S. Department of Energy, Office of Nuclear Energy DOE/EIS-0396 Summary Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement October 2008 Summary Prepared by: DOE/EIS-0396 SUMMARY Summary GNEP Draft PEIS S-i Table of Contents S.1 INTRODUCTION................................................................................................................... 1 S.1.1 Purpose and Need for Agency Action ........................................................................ 3 S.1.1.1 Energy/Electricity ................................................................................................... 3 S.1.1.2 Spent Nuclear Fuel Disposal and Waste Reduction

76

In This Issue 1 Leveraging DOE Technologies  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

In This Issue In This Issue 1 Leveraging DOE Technologies 2 2009 R&D 100 Award Winner 3 Enrollment Rises in U.S. Clinical Trials 3 Clinical Trials Ongoing Worldwide 4 Increasing Resolution 4 Ensuring Surgical Reproducibility 5 Advancing Medical Research Frontiers: A Patient Perspective 6 Artificial Retina Spinoff Technologies 8 Spotlight: Sandia National Laboratories 9 PET Scans of Brain Responses 10 Novel Software System Enhances Image Resolution 12 Progress Metrics DOE TECHNOLOGIES DRIVE INITIAL SUCCESS OF BIONIC EYE How basic research is being leveraged to enhance quality of life for the blind Using the unique skills and resources of the U.S. Department of Energy's (DOE) national laboratories, in partnership with leading research universities and the private sector,

77

Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft  

Broader source: Energy.gov (indexed) [DOE]

Comments on DOE's Verification Testing in Support of ENERGY STAR® Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft Process Document Comments on DOE's Verification Testing in Support of ENERGY STAR® Draft Process Document On April 22, 2011, The U.S. Department of Energy (DOE) released a draft of DOE's Verification Testing in Support of ENERGY STAR Process Plan for 2011. DOE accepted comments through May 9, 2011 and they are displayed below. Company/Organization Consumers Union Association of Home Appliance Manufacturers (AHAM) Air Conditioning, Heating and Refrigeration Institute (AHRI) A. O. Smith Corporation Alliance for Water Efficiency (AWE) Bradford White Corporation (BWC) BSH Home Appliances Corporation CertainTeed Corporation Traulsen InterMetro Industries Corp. Hoshizaki America, Inc. Earthjustice

78

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

440: DOE and EPA Notice of Availability of a Draft 440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

79

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

40: DOE and EPA Notice of Availability of a Draft 40: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

80

DOE/EA-1861 DRAFT ENVIRONMENTAL ASSESSMENT FOR THE THE FRITO-LAY  

Broader source: Energy.gov (indexed) [DOE]

DRAFT DRAFT ENVIRONMENTAL ASSESSMENT FOR THE THE FRITO-LAY BIOMASS BOILER PROJECT, BELOIT, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MAY 2011 DOE/EA-1861 iii May 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Assessment for the Frito-Lay Biomass Boiler Project, Beloit, Wisconsin (DOE/EA-1861) CONTACT: For more information about this Environmental Assessment (EA), please contact: Melissa Rossiter NEPA Document Manager U.S. Department of Energy Office of Energy Efficiency and Renewability Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 Facsimile: (720) 356-1560 E-mail: melissa.rossiter@go.doe.gov ABSTRACT: The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DRAFT  

Broader source: Energy.gov (indexed) [DOE]

Transportation External Coordination Working Group Meeting Transportation External Coordination Working Group Meeting Albuquerque, New Mexico April 21-23, 2004 The U.S. Department of Energy (DOE), Transportation External Coordination Working Group (TEC) held its 22 nd meeting on April 21-23, 2004, in Albuquerque, New Mexico. One hundred thirty-two participants, representing national, State, Tribal, and local government; industry; professional organizations; and other interested parties, met to address a variety of issues related to DOE's radioactive materials transportation activities. The TEC process includes the involvement of these key stakeholders in developing solutions to DOE transportation issues through their actual participation in the work product. These members provide continuing and improved coordination between DOE, other levels of

82

DOE Grid Tech Team Issues Request for Public Comments on Workshop Summaries  

Broader source: Energy.gov (indexed) [DOE]

Grid Tech Team Issues Request for Public Comments on Workshop Grid Tech Team Issues Request for Public Comments on Workshop Summaries DOE Grid Tech Team Issues Request for Public Comments on Workshop Summaries February 21, 2013 - 2:35pm Addthis DOE's Grid Tech Team issued a notice of availability and request for comments on the Electrical Grid Integration Technical Workshop summaries. Public comments on summaries from the distribution system and transmission system workshops will be accepted until March 25, 2013. The complete Federal Register Notice, including details on how to submit comments, is available for download. Addthis Related Articles DOE Convenes Multi-stakeholder Process to Address Privacy for Data Enabled by Smart Grid Technologies Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring

83

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River

84

EIS-0355: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

85

EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental  

Broader source: Energy.gov (indexed) [DOE]

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building.

86

DOE Issues Agency Information Collection Extension for OE-417...  

Broader source: Energy.gov (indexed) [DOE]

Issues Agency Information Collection Extension for OE-417 Form in the Federal Register DOE Issues Agency Information Collection Extension for OE-417 Form in the Federal Register...

87

DOE Issues Final Site-Wide Environmental Impact Statement for...  

Broader source: Energy.gov (indexed) [DOE]

Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National...

88

EA-1611-S1: Draft Supplemental Environmental Assessment | Department...  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a draft supplemental EA that...

89

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

EA-1890: DOE Notice of Availability of the Draft Environmental EA-1890: DOE Notice of Availability of the Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave

90

EA-1916: DOE Notice of Availability of a Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

6: DOE Notice of Availability of a Draft Environmental 6: DOE Notice of Availability of a Draft Environmental Assessment EA-1916: DOE Notice of Availability of a Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

91

EA-1916: DOE Notice of Availability of a Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

916: DOE Notice of Availability of a Draft Environmental 916: DOE Notice of Availability of a Draft Environmental Assessment EA-1916: DOE Notice of Availability of a Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

92

DOE-TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000  

Broader source: Energy.gov (indexed) [DOE]

TSPP-8, Approving and Issuing DOE Technical Standards - August TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000 DOE-TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000 Technical Standards Program Procedures (TSPP) This procedure provides guidance for approving and issuing DOE Technical Standards. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as "DOE Components") working to the latest revision of DOE Order 252.1, "Technical Standards Program." DOE-TSPP-8, Approving and Issuing DOE Technical Standards - August 1, 2000 More Documents & Publications APPROVING AND ISSUING DOE TECHNICAL STANDARDS DOE-TSPP-8, Approving and Issuing DOE Technical Standards - July 1, 2009

93

Energy Department Issues Draft Request For Proposal for Nuclear...  

Energy Savers [EERE]

information on the DRFP is available at: https:www.emcbc.doe.govSEBNRCdraftrfppage.php. DOE has requested that all comments, questions, suggested changes, and feedback should...

94

Approving and Issuing DOE Technical Standards, TSPP-6  

Broader source: Energy.gov (indexed) [DOE]

6-2013 6-2013 DOE TECHNICAL STANDARDS September 2013 PROGRAM PROCEDURES APPROVING AND ISSUING DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Washington, D.C. 2058 DOE-TSPP-6-2013 Approving and Issuing September 2013 DOE Technical Standards Program CONTENTS 1. SCOPE ............................................................................................................................................ 1 1.1 Purpose .......................................................................................................................1 1.2 Applicability .................................................................................................................1 2. APPROVING AND ISSUING DOE TECHNICAL STANDARDS ................................................... 1

95

DOE/EA-1792S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE  

Broader source: Energy.gov (indexed) [DOE]

S S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT Castine US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado January 2013 DOE/EA-1792S i Draft - January 2013 ACRONYMS AND ABBREVIATIONS CMP Central Maine Power CFR Code of Federal Regulations DMR Maine Department of Marine Resources DOE U.S. Department of Energy DPS distinct population segment EA environmental assessment EFH essential fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish aggregation device

96

Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects  

Broader source: Energy.gov [DOE]

The Department of Energy has issued a draft solicitation that would provide up to $12.6 billion in loan guarantees for Advanced Nuclear Energy Projects, supporting the Administration’s all-of-the-above energy strategy and bringing the nation closer to its low-carbon future.

97

DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards | Department  

Broader source: Energy.gov (indexed) [DOE]

6-2013, Approving and Issuing DOE Technical Standards 6-2013, Approving and Issuing DOE Technical Standards DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards Technical Standards Program Procedures (TSPP) - September 16, 2013 This procedure provides guidance for approving and issuing the Department of Energy (DOE) Technical Standards. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as Technical Standards Program (TSP) participants) working to the latest revision of DOE Order (O) 252.1A, Technical Standards Program. DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards More Documents & Publications DOE-TSPP-7-2013, Maintaining DOE Technical Standards DOE-TSPP-6, Coordination of DOE Technical Standards - July 1, 2009

98

DOE Commercial Building Energy Asset Score Web Service (Draft)  

SciTech Connect (OSTI)

Documentation of the DOE Commercial Building Energy Asset Score application programming interface (API).

Elliott, Geoffrey; Wang, Na

2013-09-30T23:59:59.000Z

99

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon (December 2010)

100

Summary: Draft Uranium Leasing Program Programmatic Environmental Impact Statement: DOE/EIS 0472-D, March 2013  

Broader source: Energy.gov (indexed) [DOE]

Summary: Draft ULP PEIS March 2013 Summary: Draft ULP PEIS March 2013 COVER SHEET 1 2 3 Lead Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: The cooperating agencies are U.S. Department of the Interior (DOI), 6 Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado 7 Department of Transportation (CDOT); Colorado Division of Reclamation, Mining, and Safety 8 (CDRMS); Colorado Parks and Wildlife (CPW); Mesa County Commission; Montrose County 9 Commission; San Juan County Commission; San Miguel County Board of Commissioners; the 10 Pueblo of Acoma Tribe; the Pueblo de Cochiti Tribe; the Pueblo de Isleta Tribe; the Navajo 11 Nation; and the Southern Ute Indian Tribe. 12 13 Title: Draft Uranium Leasing Program Programmatic Environmental Impact Statement 14

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE Issues Draft RFP for Hanford Site Lab Services | Department...  

Broader source: Energy.gov (indexed) [DOE]

staff will be covered under the Labor-Hour CLINS, and defined benefit, pension, and health care employer costs will be covered under the Cost Reimbursement CLINS. Services to...

102

DOE/EIS-03321: Condon Wind Project Draft Environmental Impact Statement (05/01)  

Broader source: Energy.gov (indexed) [DOE]

1 1 Draft Environmental Impact Statement DOE/EIS-0321 CONDON WIND PROJECT Condon Wind Project Draft Environmental Impact Statement (DOE/EIS-0321) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Condon Wind Project States Involved: Oregon Abstract: BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource

103

Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation  

Broader source: Energy.gov [DOE]

The Energy Department issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the United States that avoid, reduce, or sequester greenhouse gases.

104

CEQ Issues Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews  

Broader source: Energy.gov [DOE]

The Council on Environmental Quality (CEQ) issued revised draft guidance on consideration of greenhouse gas (GHG) emissions and the effects of climate change in National Environmental Policy Act (NEPA) reviews on December 18, 2014

105

DOE Issues Proposed Coverage Determination for Hearth Products...  

Broader source: Energy.gov (indexed) [DOE]

for Hearth Products DOE Issues Proposed Coverage Determination for Hearth Products December 26, 2013 - 12:00am Addthis The Department of Energy has issued a pre-publication...

106

DOE Issues Final Request for Proposal for Oak Ridge Transuranic...  

Office of Environmental Management (EM)

Oak Ridge Transuranic Waste Processing Center Services DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services October 14, 2014 - 2:16pm...

107

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for...

108

DOE Issues Final Rule for Alternative Efficiency Determination...  

Office of Environmental Management (EM)

Rating Methods DOE Issues Final Rule for Alternative Efficiency Determination Methods and Alternative Rating Methods December 26, 2013 - 12:00am Addthis The Department of Energy...

109

EIS-0447: DOE Notice of Availability of Draft Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of...

110

EIS-0431: DOE Notice of Availability of Draft Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA DOE announces the availability...

111

EIS-0408: DOE Notice of Availability of a Programmatic Draft...  

Broader source: Energy.gov (indexed) [DOE]

by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in...

112

DRAFT - DOE O 333.1, Administering Work Force Discipline  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide requirements and responsibilities for administering workforce discipline that includes disciplinary, adverse, and alternative corrective actions in the Department of Energy (DOE).

113

DOE/EIS-0485 Draft Environmental Impact Statement Grande Prairie...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1000 Independence Avenue SW Washington, DC 20585 Telephone: (800) 472-2756 DOE NEPA Web Site: http:energy.gov nepaoffice-nepa-policy-and-compliance ABSTRACT: Grande...

114

DOE/EIS-0247; Draft Environmental Impact Statement Construction and Operation of the Spallation Neutron Source, December 1998  

Broader source: Energy.gov (indexed) [DOE]

December 1998 December 1998 Construction and Operation of the S PALLATION N EUTRON S OURCE DRAFT ENVIRONMENTAL IMPACT STATEMENT U.S. Department of Energy Office of Science DOE/EIS-0247 Construction and Operation of the Spallation Neutron Source Facility Draft Environmental Impact Statement U.S. Department of Energy Office of Science December 1998 DOE/EIS-0247 Draft, December 1998 Cover Sheet COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS), Construction and Operation of the Spallation Neutron Source (DOE/EIS-0247) LOCATIONS OF ALTERNATIVE SITES: Illinois, New Mexico, New York, and Tennessee. CONTACT: For further information on this document, write or call: Mr. David Wilfert, EIS Document Manager U.S. Department of Energy Oak Ridge Operations Office

115

Microsoft Word - DOE-GJ-97491-952-FINAL DRAFT_S01406.doc  

Office of Legacy Management (LM)

Interim Remedial Action Report Interim Remedial Action Report for the Groundwater Operable Unit of the Weldon Spring Site March 2005 Office of Legacy Management DOE 952 - /GJ/79491 U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy Interim Remedial Action Report for the Groundwater Operable Unit March 2005 DOE/GJ/79491-952 Page iii Contents Acronyms and Abbreviations ..........................................................................................................v Abstract .........................................................................................................................................

116

Geothermal Energy R&D Program Annual Progress Report for Fiscal Year 1989 Draft  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE -2005)

None

1990-04-01T23:59:59.000Z

117

DOE/EIS-0395; San Luis Rio Colorado Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

note: Missing pages contain figures which can be found in the "Figures" folder note: Missing pages contain figures which can be found in the "Figures" folder on the San Luis Rio Colorado Project Draft Environmental Impact Statement compact disc (CD). Some of the figures were removed from this file to decrease file size for ease of downloading and/or viewing. San Luis Rio Colorado Project Draft EIS I S SUMMARY The U.S. Department of Energy (DOE) received applications from North Branch Resources, LLC (NBR) and Generadora del Desierto S.A. de C.V. (GDD) for the proposed San Luis Rio Colorado Project (Proposed Project). GDD and NBR (collectively termed the Applicants) are each wholly owned subsidiaries of North Branch Holding, LLC. GDD applied to the Office of Electricity Delivery and Energy Reliability (OE), an organizational unit within DOE, for a

118

Microsoft Word - Issue FY2010 Q1 Draft 20091228.doc  

Broader source: Energy.gov (indexed) [DOE]

On October 5, 2009, On October 5, 2009, President Obama signed Executive Order (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance. 1 This order represents a transformative shift in the way the government will operate by establishing greenhouse gas emissions (GHGs) as the integrating metric for tracking progress toward federal sustainability. The new order does not replace EO 13423, Strengthening Federal Environmental, Energy, and Transportation Management. Like previous orders, the new order relies heavily on effective real property asset management practices to achieve its goals. It provides new direction in these areas: * Stormwater, potable, industrial and landscaping water * Waste including recycling and composting * Integrated planning

119

Public Hearing, DOE Release of DUF6 Conversion Facility Draft Environmental Impact Statements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 UNITED STATES DEPARTMENT OF ENERGY 2 PUBLIC HEARING 3 4 SUBJECT: DOE Release of DUF6 Conversion 5 Facility Draft Environmental Impact Statements 6 DATE: January 13, 2004 7 LOCATION: Department of Energy 8 Environmental Information Center 115 Memorial Drive 9 Paducah, Kentucky 42001 10 TIME: 6:00 p.m. to 9:00 p.m. 11 FACILITATOR: Darryl Armstrong 12 REPORTED BY: Amy S. Caronongan, RPR, CSR 13 14 15 16 17

120

Draft  

Broader source: Energy.gov (indexed) [DOE]

Closing the Circle: Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table of Contents Part I: Making of the Nuclear Weapons Complex, 1942-1955 1 The Manhattan Project: Genesis of the Complex 1 2 Health and Safety Concerns Environmental and Waste Management Concerns 3 The Atomic Energy Commission: Expansion of the Complex

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE Issues Amended Funding Opportunity Announcement for Third Round of  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Amended Funding Opportunity Announcement for Third Round DOE Issues Amended Funding Opportunity Announcement for Third Round of Clean Coal Power Initiative DOE Issues Amended Funding Opportunity Announcement for Third Round of Clean Coal Power Initiative June 15, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has issued an amendment to the Funding Opportunity Announcement for Round 3 of the Clean Coal Power Initiative. The amendment, which was issued on June 9, 2009, incorporates special provisions of the American Recovery and Reinvestment Act of 2009. DOE anticipates making multiple awards under this FOA and may be able to provide up to $1.4 billion to be distributed among projects selected under both the previous closing date of January 20, 2009 and the new closing date of August 24, 2009. Of the total amount, approximately $800 million in DOE

122

DRAFT ADVICE - UNACCEPTABLE PROGRAM IMPACTS UNDER FY 97 BUDGET  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

River and the Corridor's ecological and cultural resources has been a long-standing core public value. DOE- Richland (DOE-RL) has now issued a draft Request for Proposals...

123

Issues related to EM management of DOE spent nuclear fuel  

SciTech Connect (OSTI)

This document is a summary of the important issues involved in managing spent nuclear fuel (SNF) owned by the Department of Energy (DOE). Issues related to civilian SNF activities are not discussed. DOE-owned SNF is stored primarily at the Hanford Site, Idaho National Engineering Laboratory (INEL), Savannah River Site (SRS), Oak Ridge National Laboratory (ORNL), and West Valley Demonstration Project. Smaller quantities of SNF are stored at Brookhaven National Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory (LANL). There is a wide variety of fuel types, including both low and high enrichment fuels from weapons production, DOE reactors, research and development programs, naval programs, and universities. Most fuel is stored in pools associated with reactor or reprocessing facilities. Smaller quantities are in dry storage. Physical conditions of the fuel range from excellent to poor or severely damaged. An issue is defined as an important question that must be answered or decision that must be made on a topic or subject relevant to achieving the complimentary objectives of (a) storing SNF in compliance with applicable regulations and orders until it can be disposed, and (b) safely disposing of DOE`s SNF. The purpose of this document is to define the issues; no recommendations are made on resolutions. As DOE`s national SNF management program is implemented, a system of issues identification, documentation, tracking, and resolution will be implemented. This document is an initial effort at issues identification. The first section of this document is an overview of issues that are common to several or all DOE facilities that manage SNF. The common issues are organized according to specific aspects of spent fuel management. This is followed by discussions of management issues that apply specifically to individual DOE facilities. The last section provides literature references.

Abbott, D.G. [EG& G Idaho, Inc., Idaho Falls, ID (United States); Abashian, M.S.; Chakraborti, S.; Roberson, K.; Meloin, J.M. [IT Corp. (United States)

1993-07-01T23:59:59.000Z

124

DOE LABORATORY OPEN SOURCE SOFTWARE: ADVANCE DOE PROGRAM Approval and other oss Licensing Issues  

Broader source: Energy.gov [DOE]

On Feb 1, 2002, DOE Patent Counsel issued an IPI-II-1-01 for "Development and Use of Open Source Software."

125

DOE/EIS-0396 Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (October 2008)  

Broader source: Energy.gov (indexed) [DOE]

RESPONSIBLE AGENCY: United States Department of Energy (DOE) RESPONSIBLE AGENCY: United States Department of Energy (DOE) TITLE: Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (GNEP PEIS; DOE/EIS-0396) CONTACT: For further information on this PEIS, For general information on the DOE National write or call: Environmental Policy Act (NEPA) process, write or call: Mr. Francis Schwartz Carol Borgstrom, Director GNEP PEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Office of Nuclear Energy, NE-5 U.S. Department of Energy U.S. Department of Energy 1000 Independence Avenue, SW 1000 Independence Avenue, SW Washington, DC 20585 Washington, DC 20585 (202) 586-4600 (866) 645-7803 or leave a message at 1-800-472-2756 Abstract: The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the

126

DOE/EIS-0289; Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project, August 1999  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA August 1999 U.S. DEPARTMENT OF ENERGY COVER SHEET August 1999 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, Federal Energy Technology Center, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@fetc.doe.gov.

127

DOE Issues Request for Information on Fuel Cells for Continuous...  

Broader source: Energy.gov (indexed) [DOE]

Fuel Cells for Continuous On-Board Recharging for Battery Electric Light-Duty Vehicles DOE Issues Request for Information on Fuel Cells for Continuous On-Board Recharging for...

128

Draft Supplement Analysis for Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE'S Inventory of Depleted Uranium Hexafluoride  

Broader source: Energy.gov (indexed) [DOE]

DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED URANIUM OXIDE CONVERSION PRODUCT GENERATED FROM DOE'S INVENTORY OF DEPLETED URANIUM HEXAFLUORIDE (DOE/EIS-0359-SA1 AND DOE/EIS-0360-SA1) March 2007 March 2007 i CONTENTS NOTATION........................................................................................................................... iv 1 INTRODUCTION AND BACKGROUND ................................................................. 1 1.1 Why DOE Has Prepared This Draft Supplement Analysis .............................. 1 1.2 Background ....................................................................................................... 3 1.3 Proposed Actions Considered in this Draft Supplement Analysis.................... 4

129

DOE Issues Amended Funding Opportunity Announcement for Third Round of  

Broader source: Energy.gov (indexed) [DOE]

Issues Amended Funding Opportunity Announcement for Third Round Issues Amended Funding Opportunity Announcement for Third Round of Clean Coal Power Initiative DOE Issues Amended Funding Opportunity Announcement for Third Round of Clean Coal Power Initiative June 15, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has issued an amendment to the Funding Opportunity Announcement for Round 3 of the Clean Coal Power Initiative. The amendment, which was issued on June 9, 2009, incorporates special provisions of the American Recovery and Reinvestment Act of 2009. DOE anticipates making multiple awards under this FOA and may be able to provide up to $1.4 billion to be distributed among projects selected under both the previous closing date of January 20, 2009 and the new closing date of August 24, 2009. Of the total amount, approximately $800 million in DOE

130

DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Final Mercury Storage Environmental Impact Statement: DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage DOE Issues Final Mercury Storage Environmental Impact Statement: Texas Site Is Preferred for Long-Term Mercury Storage January 19, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON - The Department of Energy has prepared a Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement to analyze the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven locations. Based on these factors, DOE identified the Waste Control Specialists, LLC, site near Andrews, Texas, as the preferred alternative for long-term management and storage of mercury. DOE will consider the environmental impact information presented in this

131

Microsoft Word - DOE-EA-1599 Draft 2008-06-11--rjk dc - accepted.doc  

Broader source: Energy.gov (indexed) [DOE]

599 599 ENVIRONMENTAL ASSESSMENT DISPOSITION OF RADIOACTIVELY CONTAMINATED NICKEL LOCATED AT THE EAST TENNESSEE TECHNOLOGY PARK, OAK RIDGE, TENNESSEE, AND THE PADUCAH GASEOUS DIFFUSION PLANT, PADUCAH, KENTUCKY, FOR CONTROLLED RADIOLOGICAL APPLICATIONS U.S. Department of Energy Oak Ridge Office Oak Ridge, Tennessee June 2008 JASON ASSOCIATES, INC. AND DADE MOELLER & ASSOCIATES, INC. contributed to the preparation of this document and should not be considered eligible contractors for its review. DOE/EA-1599 DRAFT ENVIRONMENTAL ASSESSMENT DISPOSITION OF RADIOACTIVELY CONTAMINATED NICKEL LOCATED AT THE EAST TENNESSEE TECHNOLOGY PARK, OAK RIDGE, TENNESSEE, AND THE PADUCAH GASEOUS DIFFUSION PLANT, PADUCAH, KENTUCKY, FOR CONTROLLED RADIOLOGICAL APPLICATIONS

132

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs.

133

DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

⇒ ⇒ DRAFT 19 December 2012⇐= Status of the heaviest elements as of January 2013 Don Groom, Particle Data Group Superheavy elements are normally synthesized by exposing a high-Z target to a 2.5-7.5 MeV/u ion beam such as 48 Ca or 70 Zn. The target can be a stable isotope such as 208 Pb or 209 Bi; in this case the process is called cold fusion. If the target is radioactive (an actinide), it is a "hot fusion" reaction. Targets as heavy as 249 Bk have been used. Since fusion is followed by neutron loss (e.g. 248 Cf( 48 Ca,4n) 292 Lv), the atomic numbers of the beam and target nuclei determine whether the fusion products have even or odd Z. The main laboratories involved are at Dubna, Darmstadt, Berkeley, and RIKEN Nashina Center. Fusion cross sections steadily decrease with increasing Z, and are in the picobarn range for the heaviest elements. The cross section can be optimized for a given

134

DOE Issues Salt Waste Determination for the Savannah River Site |  

Broader source: Energy.gov (indexed) [DOE]

Issues Salt Waste Determination for the Savannah River Site Issues Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued the waste determination for the treatment and stabilization of low activity salt-waste at the Savannah River Site allowing for significant reductions in environmental and health risks posed by the material. Stored in forty-nine underground tanks, approximately 36 million gallons of radioactive waste is left over from plutonium production during the Cold War. In addition, the department issued an amended Record of Decision and Implementation Plan to the Defense Nuclear Facilities Safety Board. "Today's announcement clears the way for the removal and treatment of this

135

DOE Issues Funding Opportunity for Innovations to Increase Cybersecurity  

Broader source: Energy.gov (indexed) [DOE]

Issues Funding Opportunity for Innovations to Increase Issues Funding Opportunity for Innovations to Increase Cybersecurity for Energy Delivery Systems DOE Issues Funding Opportunity for Innovations to Increase Cybersecurity for Energy Delivery Systems February 11, 2013 - 10:53am Addthis The Office of Electricity Delivery and Energy Reliability issued a new Funding Opportunity Announcement (FOA), Innovation for Increasing Cybersecurity for Energy Delivery Systems, on February 8. The announcement is seeking applications to conduct research, development and demonstrations leading to next generation tools and technologies that will become widely adopted to enhance and accelerate deployment of cybersecurity capabilities for the U.S energy infrastructure, including cyber secure integration of smart grid technologies.

136

-DRAFT-  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Effect of SCR NOx Control of the Effect of SCR NOx Control Technology on Mercury Speciation Thomas J. Feeley, III U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-6134 Fax: 412-386-4822 E-mail: thomas.feeley@netl.doe.gov Lynn A. Brickett U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-6574 Fax: 412-386-5917 E-mail: lynn.brickett@netl.doe.gov James T. Murphy Science Applications International Corporation 626 Cochrans Mill Road Pittsburgh, PA 15236 Phone: 412-386-4115 Fax: 412-386-4516 E-mail: james.murphy@netl.doe.gov March 2003 Abstract The U.S. Environmental Protection Agency (EPA) performed an Information Collection Request

137

Valuation Studies Volume 0 Number 0 2012 Draft [2012-05-27] Special issue on 'Valuing Tourism'  

E-Print Network [OSTI]

Valuation Studies Volume 0 Number 0 2012 Draft [2012-05-27] ! ! Special issue on 'Valuing Tourism' ! Call for abstracts The study of tourism has recently evolved from managerial preoccupations with profit field of study. Growing concerns about connecting tourism to larger development, cultural and innovation

Zhao, Yuxiao

138

Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation  

Broader source: Energy.gov [DOE]

In support of the Administration’s all-of-the-above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or sequester greenhouse gases.

139

DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

Issues Guidance on Civil Penalties for EPCA Energy Efficiency Issues Guidance on Civil Penalties for EPCA Energy Efficiency Violations DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency Violations May 7, 2010 - 12:50pm Addthis Today, the Department of Energy issued Guidance on the Imposition of Civil Penalties for Violations of EPCA Standards and Certification Obligations. As explained in the Guidance, the Department's penalty policy is intended to advance three goals: (1) to deter future violations; (2) to ensure consistency and equity in the assessment of penalties; and (3) to encourage complete and timely resolution of any instances of non-compliance. The Department also sets forth its basic approach to the imposition of penalties for violations of DOE's standards and certification requirements. A complete version of the Guidance is available here.

140

DOE Issues Request for Quotations for Depleted Uranium Hexafluoride  

Broader source: Energy.gov (indexed) [DOE]

Issues Request for Quotations for Depleted Uranium Hexafluoride Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services December 12, 2012 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH. The RFQ is for a Time-and-Materials Task Order for three years with two one-year option periods. The estimated contract value is approximately $15 - 20 million.

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Issues Request for Quotations for Depleted Uranium Hexafluoride  

Broader source: Energy.gov (indexed) [DOE]

Issues Request for Quotations for Depleted Uranium Hexafluoride Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services December 12, 2012 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH. The RFQ is for a Time-and-Materials Task Order for three years with two one-year option periods. The estimated contract value is approximately $15 - 20 million.

142

Draft  

Broader source: Energy.gov (indexed) [DOE]

8, 2005, 11:00 a.m.-12:30 p.m. EST 8, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Ray English (Office of Naval Reactors, DOE), Scott Field (Western Interstate Energy Board [WIEB]), Bob Fronczak (Association of American Railroads), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Bill Mackie (Western Governors' Association), Roger Mulder (Texas Energy Conservation Office), Ellen Ott (DOE General Counsel), Tammy Ottmer (WIEB-Colorado), Jim Reed (NCSL), Tim Runyon (Illinois Department of Nuclear Safety), Conrad Smith (CSG-East), Ruth Weiner (Sandia National Laboratories) Contractor Support: Ralph Best (BSC), Peter Bolton (BAH)Randy Coppage (BAH),

143

-DRAFT-  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE/NETL's Mercury Control Technology DOE/NETL's Mercury Control Technology R&D Program for Coal-Fired Power Plants Thomas J. Feeley, III 1. , James Murphy 2. , Jeffrey Hoffmann 2. , and Scott A. Renninger 1. 1. U.S. Department of Energy, National Energy Technology Laboratory 2. Science Applications International Corporation Abstract Mercury exists in trace amounts in coal. In the United States, coal-fired power plants emit about 48 tons of mercury and are the largest point source of emissions. The U.S. Environmental Protection Agency has determined the need to control mercury emissions from power plants. In addition, several legislative proposals have been introduced in the 108 th Congress to reduce mercury emissions from the electric-utility sector. Recognizing the potential for mercury regulations, the U.S. Department of Energy/National

144

Draft  

Broader source: Energy.gov (indexed) [DOE]

September 15, 2005, 11:00 a.m.-12:00 p.m. EST September 15, 2005, 11:00 a.m.-12:00 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Patrick Brady (BNSF), Sandi Covi (Union Pacific), Scott Field (WIEB-CO), Bob Fronczak (AAR), Eric Huang (DOE Office of Transportation), Paul Johnson (ORNL), Adam Levin (Exelon Generation), Bill Mackie (Western Governors' Association), Ken Niles (WIEB), Doug Osborn (Sandia National Laboratories), Ellen Ott (DOE General Counsel), Lisa Sattler (CSG-Midwest),Conrad Smith (CSG-East), Sarah Wochos (CSG-MW) Contractor Support: Randy Coppage (BAH), Michele Enders (SAIC), Lee Finewood (BAH), and Ron Ross (BSC) Summary: The conference call began at 11:00 a.m. Eastern time on Thursday, September 15, 2005.

145

Draft  

Broader source: Energy.gov (indexed) [DOE]

24, 2005, 11:00 a.m.-12:30 p.m. EST 24, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Ray English (Office of Naval Reactors, DOE), Bob Fronczak (Association of American Railroads), Bob Halstead (Nevada Agency for Nuclear Projects), Eric Huang (DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Adam Levin (Exelon Generation Company), Jim Reed (NCSL), Conrad Smith (CSG-East), Steve Sullivan (American Shortline Railroad Association),Ruth Weiner (Sandia National Laboratories) Contractor Support: Ralph Best (BSC), Randy Coppage (BAH),Ed Davis (BSC), Michele Enders (SAIC), Lee Finewood (BAH),and Ron Ross (BSC)

146

DRAFT  

Broader source: Energy.gov (indexed) [DOE]

.3 (January 2012) .3 (January 2012) 1 Compliance with U.S. Export Control Laws, Regulations and Policies References a. Federal Acquisition Regulations (FAR) 17.6, Management and Operating Contracts b. Department of Energy Acquisition Regulations (DEAR) 917.6, Management and Operating Contracts c. Atomic Energy Act of 1954 (AEA), as amended, http://www.nrc.gov/reading-rm/doc- collections/nuregs/staff/sr0980/v1/sr0980v1.pdf#page=13 (accessed 9/27/11) d. "Contractor Compliance with Deemed Export Controls," DOE Inspector General (IG) Report DOE/IG-0645, April 2004 e. "Review of Status of Prior Export Control Recommendations at the Department of

147

Draft  

Broader source: Energy.gov (indexed) [DOE]

February 24, 2005, 11:00 a.m.-12:30 p.m. EST February 24, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Dennis Brooks (Texas Energy Conservation Office), Patrick Edwards (PA Public Utility Commission), Ray English (Office of Naval Reactors, DOE), Paul Genoa ( Nuclear Energy Institute), Eric Huang (DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Bill Mackie (Western Governors' Association [WGA]), Roger Mulder (Texas Energy Conservation Office), Ken Niles (WIEB), Jim Reed (NCSL), Lisa Sattler (CSG-Midwest), Conrad Smith (CSG-East), Sara Wochos (CSG-Midwest) Contractor Support: Ralph Best (BSC), Ed Davis (BSC), Michele Enders (SAIC),

148

DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

03/1195 03/1195 Healy Clean Coal Project A DOE Assessment Office of Fossil Energy National Energy Technology Laboratory U.S. Department of Energy September 2003 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

149

Draft  

Broader source: Energy.gov (indexed) [DOE]

7, 2005, 12:30 p.m.-1:30 p.m. EST 7, 2005, 12:30 p.m.-1:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Kevin Blackwell (FRA), Patrick Brady (Burlington Northern Santa Fe Railroad), Ray English (Office of Naval Reactors, DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Bill Mackie (Western Governors' Association [WGA]), Ellen Ott (Office of General Counsel, DOE), Tim Runyon (Illinois Department of Nuclear Safety), Lisa Sattler (CSG-Midwest), Ruth Weiner (SNL), Sara Wochos (CSG-Midwest) Contractor Support: Ralph Best (BSC), Andrea Dravo (BAH), Michele Enders (SAIC), Susan Knisely (BAH ), Julie Offner (BAH), and Ron Ross (BSC) Summary: The conference call began at 12:30 p.m. Eastern time on Thursday, January 27, 2005. Jay

150

draft  

Broader source: Energy.gov (indexed) [DOE]

3 3 (08-93) U.S. Department of Energy ORDER FOR SUPPLIES OR SERVICES ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMPORTANT: Mark all packages and papers with contract and/or order numbers. 1. DATE OF ORDER 2. CONTRACT NO. (if any) 3. ORDER NO. 4. REQUISITION/REFERENCE NO. 5. ISSUING OFFICE (Address correspondence to) BUYER NO. CODE 6. SHIP TO: (Consignee and address, ZIP Code) SHIP VIA: 7. TO CONTRACTOR (Name, address and ZIP Code) 8. TYPE OF ORDER 9 9 A. PURCHASE - Reference your___________________________ ____________________________________________________________ Please furnish the following on the terms and conditions specified on both sides for this order and on the attached sheets, if any,

151

DRAFT  

Broader source: Energy.gov (indexed) [DOE]

FOR THE TRANSFER OF THE KANSAS CITY PLANT, KANSAS CITY, MISSOURI U.S. Department of Energy National Nuclear Security Administration May 2013 DOE/EA-1947 CONVERSION FACTORS Metric to English English to Metric Multiply by To get Multiply by To get Area Square kilometers 247.1 Acres Square kilometers 0.3861 Square miles Square meters 10.764 Square feet Concentration Kilograms/sq. meter 0.16667 Tons/acre Milligrams/liter 1 a Parts/million Micrograms/liter 1 a Parts/billion Micrograms/cu. meter 1 a Parts/trillion Density Grams/cu. centimeter 62.428 Pounds/cu. ft. Grams/cu. meter 0.0000624 Pounds/cu. ft. Length Centimeters 0.3937 Inches Meters 3.2808 Feet Micrometers 0.00003937 Inches Millimeters 0.03937 Inches Kilometers 0.62137 Miles

152

DOE Issues Final Environmental Impact Statement for Moab, Utah Site |  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement for Moab, Utah Site Environmental Impact Statement for Moab, Utah Site DOE Issues Final Environmental Impact Statement for Moab, Utah Site July 25, 2005 - 2:27pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its final environmental impact statement (EIS) for the Moab Uranium Mill Tailings Remedial Action Project Site, located on the bank of the Colorado River. The EIS details the preferred option of removal of the tailings pile and contaminated materials, along with ground water remediation. The tailings will be moved, predominately by rail, to the proposed Crescent Junction, Utah, site, more than 30 miles from the Colorado River. "Taking all facts into account, we believe the recommendations issued today provide the best solution to cleaning up Moab and protecting the River,"

153

DOE Bioenergy Center Special Issue. The Bioenergy Sciences Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bioenergy Bioenergy Center Special Issue. The Bioenergy Sciences Center (BESC) Richard A. Dixon Published online: 22 October 2009 # Springer Science + Business Media, LLC. 2009 Keywords Bioenergy centers . United States Department of Energy . Biomass recalcitrance . High-throughput screening . Plant transformation This issue of BioEnergy Research is the first of three special issues to feature work from the US Department of Energy (DOE) Bioenergy Centers. In June 2006, the DOE's Genomes to Life Program published a report, entitled "Breaking the biological barriers to cellulosic ethanol: a joint research agenda," that outlined research areas requir- ing significant investment in order to meet the target of making cellulosic ethanol cost-competitive by 2012. Words were converted to action in June 2007 when Energy Secretary Samuel W. Bodman announced the establishment of

154

DOE/EIS-0303D; High-Level Waste Tank Closure Draft Environmental Impact Statement (November 2000)  

Broader source: Energy.gov (indexed) [DOE]

EIS-0303D EIS-0303D DRAFT November 2000 Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, High-Level Waste Tank Closure Draft Environmental Impact Statement (DOE/EIS-0303D), Aiken, SC. CONTACT: For additional information or to submit comments on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 742A, Room 183 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov The EIS is also available on the internet at: http://tis.eh.doe.gov/nepa/docs/docs.htm For general information on the process that DOE follows in complying with the National Environmental

155

Draft  

Broader source: Energy.gov (indexed) [DOE]

Wednesday, November 9, 2005, 11:00 a.m.-12:00 p.m. EST Wednesday, November 9, 2005, 11:00 a.m.-12:00 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW) Members: Kevin Blackwell (DOT/FRA), Pat Brady (BNSF), Anne Clark (WGA), Doug Osborn (Sandia National Laboratories), Ellen Ott (DOE General Counsel), Tim Runyon (CSG-MW),Lisa Sattler (CSG-Midwest), Ruth Weiner (Sandia National Laboratories), Sarah Wochos (CSG-MW) Contractor Support: Ralph Best (BSC), Michele Enders (SAIC), and John Smegal (LEGIN) Summary: The conference call began at 11:00 a.m. Eastern time on Wednesday, November 9, 2005. Jay Jones started the meeting by reviewing the items to be discussed during the call. Jay announced that Alex Thrower just sent out the Security Topic Group (STG) Task Plan. The STG's Task Plan overlaps with the RTG's Task Plan and there may need to be a

156

DOE Issues Noncompliance Notices for Three Showerhead Models | Department  

Broader source: Energy.gov (indexed) [DOE]

Issues Noncompliance Notices for Three Showerhead Models Issues Noncompliance Notices for Three Showerhead Models DOE Issues Noncompliance Notices for Three Showerhead Models October 4, 2011 - 4:02pm Addthis The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determination this week to three companies regarding showerheads that violate federal water conservation standards. The federal standard enacted by Congress limits showerhead water consumption to no more than 2.5 gallons per minute. Watermark Designs' model SH-FAL-90 consumes 10.5 gallons per minute (gpm). Hudson Reed's HEAD16 model consumes 8.1 gpm, and an eight-jet model, SKU 150043, imported by Zoe Industries consumes 9.4 gpm. All three companies must cease distribution of these models immediately. Following earlier civil penalty actions for failure to submit required

157

DOE/EIS-0222 Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan, April 1999  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft Executive Summary Cover Sheet 1 2 3 Lead Federal Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: U.S. Department of the Interior (Bureau of Land Management, 6 Bureau of Reclamation, and U.S. Fish and Wildlife Service); Benton, Franklin, and Grant 7 counties; and the City of Richland 8 9 Consulting Tribal Governments: Nez Perce Tribe Department of Environmental Restoration 10 and Waste Management and the Confederated Tribes of the Umatilla Indian Reservation 11 12 Title: Revised Draft Hanford Remedial Action Environmental Impact Statement and 13 Comprehensive Land-Use Plan (HRA-EIS), Hanford Site, Richland, Washington 14 15 Contacts: For further information on this EIS call or contact: 16 17 Thomas W. Ferns, HRA-EIS Document Manager 18 U.S. Department of Energy, Richland Operations Office

158

DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

Guidance on Civil Penalties for EPCA Energy Efficiency Guidance on Civil Penalties for EPCA Energy Efficiency Violations DOE Issues Guidance on Civil Penalties for EPCA Energy Efficiency Violations May 7, 2010 - 12:50pm Addthis Today, the Department of Energy issued Guidance on the Imposition of Civil Penalties for Violations of EPCA Standards and Certification Obligations. As explained in the Guidance, the Department's penalty policy is intended to advance three goals: (1) to deter future violations; (2) to ensure consistency and equity in the assessment of penalties; and (3) to encourage complete and timely resolution of any instances of non-compliance. The Department also sets forth its basic approach to the imposition of penalties for violations of DOE's standards and certification requirements. A complete version of the Guidance is available here.

159

DOE Issues Funding Opportunity for Academic-Industry Collaboration -  

Broader source: Energy.gov (indexed) [DOE]

Issues Funding Opportunity for Academic-Industry Collaboration Issues Funding Opportunity for Academic-Industry Collaboration - Synchrophasor Engineering Education Program DOE Issues Funding Opportunity for Academic-Industry Collaboration - Synchrophasor Engineering Education Program November 30, 2012 - 9:09am Addthis Use of synchrophasor data from Phasor Measurement Units (PMUs) is considered to be a promising tool to monitor modern electric power systems. However, only a limited number of professionals, researchers, and students have the knowledge and expertise to understand and analyze the high-speed, time-synchronized data that will be generated by the deployment of synchrophasors. The objectives of this Funding Opportunity Announcement (FOA) are to: enable university researchers and students to gain access to and

160

DOE General Counsel Issues Arbitration Guidance for Management and  

Broader source: Energy.gov (indexed) [DOE]

General Counsel Issues Arbitration Guidance for Management and General Counsel Issues Arbitration Guidance for Management and Operations Contractors DOE General Counsel Issues Arbitration Guidance for Management and Operations Contractors February 3, 2010 - 5:31pm Addthis Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include binding arbitration in their contracts with third-parties. We have determined that there is currently no legal prohibition on M&O contractors including binding arbitration clauses in their contracts with others. In fact, we believe it often will be a good idea to include arbitration clauses as a means of limiting the risk of litigation which is often more time consuming and expensive than

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE Issues Final Appliance Test Procedure Rule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance Test Procedure Rule Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the foundation for standards that will help bring more energy efficient options to the marketplace and result in energy savings for all Americans," said DOE Assistant Secretary for Energy Efficiency and Renewable Energy Andy Karsner. The final rulemaking, which appears in today's Federal Register, will

162

EIS-0380: DOE Notice of Availability of the Draft Site-Wide Environmen...  

Broader source: Energy.gov (indexed) [DOE]

Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico NNSA announces the availability of the Draft Site-wide Environmental Impact Statement...

163

DOE to Issue Second Solicitation for Purchase of Crude Oil for...  

Energy Savers [EERE]

Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve DOE to Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum...

164

DOE Issues Finding of No Significant Impact and Final Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear

165

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Broader source: Energy.gov (indexed) [DOE]

Electric Vehicle Recharging Stations Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs. In addition, lab contractors may install electric vehicle recharging

166

EA-1891: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91: Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft...

167

DOE/EIS-0236-S1; National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS, October 1999  

Broader source: Energy.gov (indexed) [DOE]

National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California October 1999 [This page intentionally left blank.] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Draft Supplemental Environmental Impact Statement to the SSM PEIS CONTACT: For additional information on For general information on the NEPA this statement write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-293 Office of NEPA Policy and Assistance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW

168

DOE Issues Funding Opportunity for Advanced Computational and Modeling  

Broader source: Energy.gov (indexed) [DOE]

Funding Opportunity for Advanced Computational and Funding Opportunity for Advanced Computational and Modeling Research for the Electric Power System DOE Issues Funding Opportunity for Advanced Computational and Modeling Research for the Electric Power System May 23, 2012 - 8:36am Addthis The objective of this Funding Opportunity Announcement (FOA) is to leverage scientific advancements in mathematics and computation for application to power system models and software tools, with the long-term goal of enabling real-time protection and control based on wide-area sensor measurements. Specifically, this FOA focuses on two foundational research challenges: 1) handling of large data sets to improve suitability for operational (and/or planning) models and analysis; and 2) "faster than real-time" simulations that improve understanding of

169

Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0380) (08/31/06)  

Broader source: Energy.gov (indexed) [DOE]

10 Federal Register 10 Federal Register / Vol. 71, No. 169 / Thursday, August 31, 2006 / Notices Coordinator, at the address and phone number listed above. Issued at Washington, DC on August 24, 2006. Carol Matthews, Acting Advisory Committee Management Officer. [FR Doc. 06-7304 Filed 8-30-06; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). ACTION: Notice of comment period extension. SUMMARY: On July 7, 2006, NNSA published a Notice of Availability for the Draft Site-wide Environmental

170

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

171

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

172

Microsoft Word - EEI - DOE SG RFI 3 DRAFT _11 1 10_ CLEAN.docx  

Broader source: Energy.gov (indexed) [DOE]

November November 1, 2010 U.S. Department of Energy Office of Electric Delivery and Energy Reliability ATTN: Smart Grid RFI: Addressing Policy and Logistical Challenges 1000 Independence Avenue, SW Room 8H033 Washington, DC 20585 RE: SMART GRID RFI: ADDRESSING POLICY AND LOGISTICAL CHALLENGES TO SMART GRID IMPLEMENTATION The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the request by the Department of Energy ("DOE" or "Department") for information on a wide range of issues dealing with Smart Grid technology, applications, consumer interaction, policy initiatives and economic impacts, including the definition of Smart Grid; interactions with and implications for residential, commercial and industrial customers; Smart Grid costs and benefits; collaboration between

173

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

174

Listing of DOE/FE Authorizations Issued in 2013 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Issued in 2013 The following chart contains all Orders issued by the Office of Natural Gas Regulatory Activities in 2013 thru December 19. The orders include all new or...

175

Radioactive waste isolation in salt: Peer review of the Office of Nuclear Waste Isolation's draft report on an issues hierarchy and data needs for site characterization  

SciTech Connect (OSTI)

At the request of the Salt Repository Project (SRPO), Argonne National Laboratory conducted an independent peer review of a report by the Battelle Office of Nuclear Waste Isolation entitled ''Salt Repository Project Issues Hierarchy and Data Needs for Site Characterization (Draft).'' This report provided a logical structure for evaluating the outstanding questions (issues) related to selection and licensing of a site as a high-level waste repository. It also provided a first estimate of the information and data necessary to answer or resolve those questions. As such, this report is the first step in developing a strategy for site characterization. Microfiche copies of ''Draft Issues Hierarchy, Resolution Strategy, and Information Needs for Site Characterization and Environmental/Socioeconomic Evaluation - July, 1986'' and ''Issues Hierarchy and Data Needs for Site Characterization - February, 1985'' are included in the back pocket of this report.

Harrison, W.; Fenster, D.F.; Ditmars, J.D.; Paddock, R.A.; Rote, D.M.; Hambley, D.F.; Seitz, M.G.; Hull, A.B.

1986-12-01T23:59:59.000Z

176

DRAFT DRAFT DRAFT ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of safety concerns within both the DOE and contractor organizations. o Cleanup planning should include workforce stability factors to ensure a trained, experienced...

177

DRAFT Hanford Advisory Board Handout for PIC MTG 2/6/13 DOE NEPA...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the permit which utilize information from the ROD (eg. Closure Plans for TSD). CERCLA Remedial InvestigationFeasibility Study Proposed Plan Issued - Notice Issued Public...

178

DOE Issues Final Request for Proposal for Portsmouth Gaseous...  

Energy Savers [EERE]

The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion...

179

DOE's Idaho National Lab Issues Request for Proposals for Engineering...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Energy's Idaho National Laboratory today issued a Request for Proposals (RFP) for engineering services in support of development of NGNP. This RFP is for pre-conceptual...

180

DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency...  

Energy Savers [EERE]

DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps Department of Energy Announces Testing for AeroSys, Inc....

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOE issues Finding of No Significant Impact on the Disposition...  

Broader source: Energy.gov (indexed) [DOE]

for the signs. The DOE also plans to complete a Standard Format Historic American Landscape Study (HALS) report. The HALS report will document INL buildings and landscape...

182

DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE Nuclear Safety Applications (draft), December 2010  

Broader source: Energy.gov [DOE]

There have been significant developments with regard to the risk assessment and risk informed decision making, as it applies to nuclear and other safety areas, since the Department of Energy (DOE) developed its approach to managing nuclear safety. The developments and associated technical insights may be of use to DOE in its efforts to continuously improve safety performance at its nuclear facilities.

183

DOE/EIS-0312; Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft EIS (5/2001)  

Broader source: Energy.gov (indexed) [DOE]

Draft EIS Draft EIS "Piecing The Puzzle Together" DOE/EIS-0312 June 2001 B i o l o g i c a l O p i n i o n s P u b l i c B e n e f i t s P a c i f i c S a l m o n T r e a t y C o l u m b i a R i v e r F i s h e r y M a n a g e m e n t P l a n S t a t e P la n s T r i b a l P l a n s A r t i f i c i a l P r o p a g a t i o n B . A . L o w e r S n a k e F e a s i b i l i t y S t u d y E I S Wy-Kan-Ush- Mi Wa- Kush-Wit P o w e r C o u n c i l P l a n M O A ( M e m o r a n d u m o f A g r e e m e n t ) F e d e r a l C a u c u s A l l H P a p e r Wildlife Program EIS F r a m e w o r k P a p e r W a t e r s h e d M g m t . P r o g r a m E I S S O R E I S ( S y s t e m O p e r a t io n s R e v i e w ) BPA Business Plan EIS I C B E M P E I S ( I n t e r io r C o l u m b ia B a s in E c o s y s t e m M g m t . P r o je c t ) Governance Structure C a n a d i a n I s s u e s P r i v a t e I n t e r e s t s C o m m e r c i a l I n t e r e s t s ? ? Volume 1: Environmental Analyses Fish and Wildlife Implementation Plan DEIS Cover Sheet Fish & Wildlife Implementation Plan Draft Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA)

184

DOE/EIS-0373D; Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Power Systems  

Broader source: Energy.gov (indexed) [DOE]

For For additional information or for copies of this Draft EIS, contact: AVAILABILITY OF THE DRAFT CONSOLIDATION EIS Printed with soy ink on recycled paper Timothy A. Frazier, EIS Document Manager NE-50/Germantown Building Office of Nuclear Energy, Science and Technology U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Telephone: 1-800-919-3706 E-mail: ConsolidationEIS@nuclear.energy.gov This document is available on the Office of Nuclear Energy, Science and Technology's Website (http://consolidationeis.doe.gov) for viewing and downloading. TABLE OF CONTENTS vii TABLE OF CONTENTS Cover Sheet ..................................................................................................................................................................iii Table of Contents ........................................................................................................................................................vii

185

Listing of DOE/FE Authorizations Issued in 2015  

Broader source: Energy.gov [DOE]

The following chart contains all Orders issued by the Office of Natural Gas Regulatory Activities in 2015 thru January 15th. The orders include all new or renewed authority to Import and Export...

186

First draft  

Broader source: Energy.gov (indexed) [DOE]

Planning: Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group By The Regulatory Assistance Project Bob Anderson Associate Draft January 15, 2004 Transmission Planning: Institutional Issues in the West Page i Table of Contents Introduction......................................................................................................................... 1 Background-The Existing Transmission Planning Landscape......................................... 3 Interconnection-wide Transmission Planning ................................................................ 3 Seams Steering Group-Western Interconnection (SSG-WI) ...................................... 3 Western Electricity Coordinating Council (WECC)...................................................

187

DOE Issues Record of Decision for the Uranium Leasing Program  

Broader source: Energy.gov [DOE]

In a Record of Decision (ROD) published in the Federal Register today, the Department of Energy (DOE) announced that it has decided to continue management of the Uranium Leasing Program (ULP) for...

188

DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (DOE/EIS-0357D-S1)(01/16/07)  

Broader source: Energy.gov (indexed) [DOE]

0 Federal Register 0 Federal Register / Vol. 72, No. 9 / Tuesday, January 16, 2007 / Notices Dated: December 19, 2006. M. A. Harvison, Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 07-115 Filed 1-12-07; 8:45 am] BILLING CODE 3810-FF-M DEPARTMENT OF ENERGY Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project AGENCY: Department of Energy. ACTION: Notice of availability. SUMMARY: The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft

189

DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Final Site-Wide Environmental Impact Statement for the DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site February 22, 2013 - 2:38pm Addthis DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site The U.S. Department of Energy, National Nuclear Security Administration (NNSA) has issued the Final Site-Wide Environmental Impact Statement (EIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. This document presents an analysis of the potential environmental impacts of continued management and operation of the NNSS (formerly known as the Nevada Test Site), the Tonopah Test Range, and two locations in Las

190

DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers  

Broader source: Energy.gov (indexed) [DOE]

Issues Enforcement Guidance on Large-Capacity Clothes Washer Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process December 23, 2010 - 5:14pm Addthis Today, the Department of Energy issued enforcement guidance on the application of recently granted waivers for large-capacity clothes washers and announced steps to improve the waiver process - and refrain from certain enforcement actions - so that innovative covered products can demonstrate compliance with DOE efficiency requirements and come to market without undue delays. Based on comments received in response to DOE's November 30, 2010 notice, today's guidance makes clear that DOE's current test procedure does not cover large-capacity clothes washers and,

191

DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers  

Broader source: Energy.gov (indexed) [DOE]

Issues Enforcement Guidance on Large-Capacity Clothes Washer Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process December 23, 2010 - 5:14pm Addthis Today, the Department of Energy issued enforcement guidance on the application of recently granted waivers for large-capacity clothes washers and announced steps to improve the waiver process - and refrain from certain enforcement actions - so that innovative covered products can demonstrate compliance with DOE efficiency requirements and come to market without undue delays. Based on comments received in response to DOE's November 30, 2010 notice, today's guidance makes clear that DOE's current test procedure does not cover large-capacity clothes washers and,

192

DOE Hydrogen Analysis Repository: Hydrogen Quality Issues for Fuel Cell  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Quality Issues for Fuel Cell Vehicles Quality Issues for Fuel Cell Vehicles Project Summary Full Title: Hydrogen Quality Issues for Fuel Cell Vehicles Project ID: 201 Principal Investigator: Romesh Kumar Keywords: Lifecycle costs; fuel cells; steam methane reforming (SMR); autothermal reforming (ATR) Purpose Assess the influence of different contaminants and their concentration in fuel hydrogen on the life-cycle costs of hydrogen production, purification, use in fuel cells, and hydrogen analysis and quality verification. Performer Principal Investigator: Romesh Kumar Organization: Argonne National Laboratory (ANL) Address: 9700 S. Cass Avenue Argonne, IL 60439 Telephone: 630-252-4342 Email: kumar@cmt.anl.gov Period of Performance Start: October 2005 End: September 2010 Project Description Type of Project: Analysis

193

O:\IM-20\E-Government Program Office\FDMS\FDMS database\DOE\2011\DOE-HQ-2011-0014 - Daniel Cohen - GC\Comments from FDMS\Dan Manole DRAFT-0004.html  

Broader source: Energy.gov (indexed) [DOE]

14%20-%20Daniel%20Cohen%20-%20GC/Comments%20from%20FDMS/Dan%20Manole%20DRAFT-0004.html[3/23/2011 2:21:55 PM] 14%20-%20Daniel%20Cohen%20-%20GC/Comments%20from%20FDMS/Dan%20Manole%20DRAFT-0004.html[3/23/2011 2:21:55 PM] PUBLIC SUBMISSION As of: March 23, 2011 Received: March 21, 2011 Status: Pending_Post Tracking No. 80c0d039 Comments Due: April 04, 2011 Submission Type: Web Docket: DOE-HQ-2011-0014 Reducing Regulatory Burden Comment On: DOE-HQ-2011-0014-0001 Reducing Regulatory Burden Document: DOE-HQ-2011-0014-DRAFT-0004 Comment on FR Doc # 2011-02368 Submitter Information Name: Dan Manole Address: 2700 Crestridge Court N/A Suwanee, GA, 30024 Email: dan_manole@irco.com Phone: 770-291-2378 Submitter's Representative: Dan Manole Organization: Hussmann General Comment See attached file(s) Attachments DOE-HQ-2011-0014-DRAFT-0004.1: Comment on FR Doc # 2011-02368 From: Dan Manole, Regulatory Compliance Manager, Hussmann Corporation

194

Preliminary Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

195

DOE Issues Request for Information on Hydrogen Contamination Detectors  

Broader source: Energy.gov [DOE]

The Fuel Cell Technologies Office has issued a request for information seeking feedback from interested stakeholders on existing and potential hydrogen contamination detectors and related factors such as performance characteristics, system integration requirements, costs, deployment guidance, and R&D needs.

196

EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmen...  

Broader source: Energy.gov (indexed) [DOE]

The National Nuclear Security Administration (NNSA), a separately organized semi-autonomous agency within the U.S. Department of Energy (DOE), announces the availability of the...

197

DOE General Counsel Issues Arbitration Guidance for M&O Contractors |  

Broader source: Energy.gov (indexed) [DOE]

DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors (February 3, 2010) Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include binding arbitration in their contracts with third-parties. We have determined that there is currently no legal prohibition on M&O contractors including binding arbitration clauses in their contracts with others. In fact, we believe it often will be a good idea to include arbitration clauses as ameans of limiting the risk of litigation which is often more

198

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

199

POLICY FLASH 2014-16 In September 2012, DOE issued Policy Flash...  

Broader source: Energy.gov (indexed) [DOE]

6 In September 2012, DOE issued Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance to fully comply with reporting requirements. This is an update to that Policy...

200

DOE Issues Notice of Proposed Rulemaking for Electric Motors Energy Conservation Standards  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) has issued a pre-publication Federal Register notice of proposed rulemaking regarding energy conservation standards for certain commercial and industrial electric motors, under subpart B of Title 10 of the Code of Fe

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE Issues Final Rule for Section 133 of the Energy Independence Act (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet provides a summary of the final rule under Section 133 of the Energy Independence and Security Act of 2007 (EISA) that the U.S. Department of Energy (DOE) issued in March 2014.

Not Available

2014-04-01T23:59:59.000Z

202

DOE Issues Final Request for Proposal for Paducah Gaseous Diffusion Plant Support Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the performance of infrastructure support services at the Paducah Gaseous Diffusion Plant (PGDP), Paducah, Kentucky.

203

DOE Issues Energy Sector Cyber Organization NOI, Feb 2010 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Issues Energy Sector Cyber Organization NOI, Feb 2010 Issues Energy Sector Cyber Organization NOI, Feb 2010 DOE Issues Energy Sector Cyber Organization NOI, Feb 2010 The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) announced on Jan. 7 that it intends to issue a Funding Opportunity Announcement (FOA) for a National Energy Sector Cyber Organization, envisioned as a partnership between the federal government and energy sector stakeholders to protect the bulk power electric grid and aid the integration of smart grid technology to enhance the security of the grid. DOE Issues Energy Sector Cyber Organization NOI More Documents & Publications FAQ: Funding Opportunity Announcement-Smart Grid Investment Grants Grantsdown.xls Before the House Science and Technology Subcommittee on Energy and

204

Innovative Texas Clean Coal Project Takes Major Step Forward as DOE Issues  

Broader source: Energy.gov (indexed) [DOE]

Texas Clean Coal Project Takes Major Step Forward as DOE Texas Clean Coal Project Takes Major Step Forward as DOE Issues Record of Decision Innovative Texas Clean Coal Project Takes Major Step Forward as DOE Issues Record of Decision September 27, 2011 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has issued a Record of Decision (ROD) that - along with a signed cooperative agreement - will allow federal funding to be used to help build one of the world's most advanced and environmentally clean coal-based power plants. The ROD and cooperative agreement between DOE's Office of Fossil Energy (FE) and Summit Texas Clean Energy, LLC (STCE) sets in motion continued federal cost-shared funding for the Summit Texas Clean Energy Project, to be built just west of Midland-Odessa, Texas. This 400-megawatt,

205

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

DOE Issues Request for Proposals Seeking a Contractor to Manage and DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S.

206

U.S. Department of Energy (DOE) Issues Call for Proposals (CFP) for Nuclear  

Broader source: Energy.gov (indexed) [DOE]

(DOE) Issues Call for Proposals (CFP) for (DOE) Issues Call for Proposals (CFP) for Nuclear Energy Program Supporting (PS) and Mission Supporting (MS) Research and Development (R&D) U.S. Department of Energy (DOE) Issues Call for Proposals (CFP) for Nuclear Energy Program Supporting (PS) and Mission Supporting (MS) Research and Development (R&D) February 14, 2011 - 2:50pm Addthis On February 14, 2011, the DOE Office of Nuclear Energy (NE), through its Nuclear Energy University Programs (NEUP), invited 85 universities who provided 245 pre-applications to submit full proposals for PS and MS R&D. This solicitation is open only to those who previously participated in the Request for Pre-Applications (RPA) process. Background: DOE's NEUP previously received 766 pre-applications from 105 U.S. universities in the areas of Fuel Cycle (FC) R&D, Reactor Concepts

207

Letter to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007  

Broader source: Energy.gov [DOE]

Memorandum to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007

208

DOE to Issue Second Solicitation for Purchase of Crude Oil for the  

Broader source: Energy.gov (indexed) [DOE]

Issue Second Solicitation for Purchase of Crude Oil for the Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve DOE to Issue Second Solicitation for Purchase of Crude Oil for the Strategic Petroleum Reserve April 18, 2007 - 12:36pm Addthis Solicitation Issued for Up to Four Million Barrels WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it has issued the second of several solicitations planned to purchase up to four million barrels of crude oil for the United States' crude oil reserve. The first solicitation, issued March 16, 2007, resulted in no awards because the Office of Fossil Energy determined that the bids were too high and not a reasonable value for taxpayers. This series of solicitations for the purchase of crude oil are planned to replace the 11 million barrels of oil sold after Hurricane Katrina. The

209

Review Draft Review Draft  

E-Print Network [OSTI]

Review Draft Review Draft Columbia Basin White Sturgeon Planning Framework Prepared a favorable review of specific sturgeon projects but noted that an effective basin-wide management plan passage. A planning framework (this document) was drafted based on a review and synthesis of published

210

DRAFT- DOE O 442.1B, Department of Energy Employee Concerns Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to maintain an Employee Concerns Program (ECP) at the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA) that encourages the free and open expression of employee concerns and provides DOE federal, contractor, and sub contractor employees with an independent avenue to raise any concern related, but not limited, to the environment, safety, health, security, quality, and management, as well as harassment, intimidation, retaliation, and discrimination (HIRD).

211

DOE Issues Request for Proposals for Hanford Site Occupational Medical Services  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. – The Department of Energy (DOE) today issued a Request for Proposals (RFP) for an Occupational Medical Services contract at the Hanford Site. The solicitation is for a small-business contractor to perform occupational medical services for the DOE Richland Operations Office and Office of River Protection.

212

December 20, 2005, Department letter forwarding the revised version of the Department's draft Manual DOE M 450.4-X, Integrated Safety Management System Manual  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

20, 2005 20, 2005 The Honorable A. J. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Ave, Suite 700 Washington, D.C. 20004 Dear Mr. Chairman: This letter transmits to you a revised version of the Department of Energy's draft Manual DOE M 450.4-X, integrated Scffety Manugeinent System Manual. This revised version represents a significant improvement over the November 2,2005 version previously provided to your staff. This improvement occurred by addressing internal DOE comments on the Manual. The Department has also addressed various informal comments provided by your staff. The Department remains interested in the Board's comments on this Manual. Please forward any comments regarding this draft document by January 18, 2006. If you have any

213

Draft Supplemental Environmental Assessment For General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland, DOE/EA-1723S (December 2010)  

Broader source: Energy.gov (indexed) [DOE]

DRAFT SUPPLEMENTAL ENVIRONMENTAL DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT For General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative White Marsh, Maryland May 2011 U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY U.S. Department of Energy General Motors National Energy Technology Laboratory Supplemental Environmental Assessment i May 2011 ACKNOWLEDGEMENT This report was prepared with the support of the U.S. Department of Energy (DOE) under Award Number DE-EE0002629. U.S. Department of Energy General Motors National Energy Technology Laboratory Supplemental Environmental Assessment ii May 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing

214

DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375D)(February 2011)  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement for the Volume 1: Chapters 1 through 8 February 2011 Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D) T H E U.S. D E P A R T M E N T O F E N E R G Y ENERGY U.S. DEPARTMENT OF On the cover: The photographs on the front cover are, from left to right: glove boxes contaminated with GTCC Other Waste, abandoned Am-241 and Cs-137 gauges and shipping shields, and disused well logging sources being loaded into a 55-gallon drum. Draft GTCC EIS Cover Sheet COVER SHEET Lead Agency: U.S. Department of Energy (DOE) Cooperating Agency: U.S. Environmental Protection Agency (EPA) Title: Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D)

215

National Electric Transmission Congestion Study - Draft for Public...  

Broader source: Energy.gov (indexed) [DOE]

Draft for Public Comment August 2014 National Electric Transmission Congestion Study - Draft for Public Comment August 2014 On August 19, 2014, the Department issued a Federal...

216

Microsoft Word - NAP Coalition Response to DOE RFI DRAFT 10.11.01.docx  

Broader source: Energy.gov (indexed) [DOE]

NAP Coalition Response to DOE RFI NAP Coalition Response to DOE RFI Addressing Policy and Logistical Challenges to Smart Grid Implementation November 1, 2010 The NAP Coalition is a "Coalition of Coalitions" that has been formed for the purpose of implementing the National Action Plan released by FERC in cooperation with DOE in June of 2010. Organizations working together on NAP implementation in include EEI, APPA, NRECA, ASE, ACEEE, NASUCA, NARUC, NASEO, DRSG, DRCC and EDF. The NAP Coalition submits a response in this RFI only to question #14 in Section II of the RFI. 14. How should insights about consumer decision-making be incorporated into federal-state collaborative efforts such as the Federal Energy Regulatory Commission's (FERC) National Action Plan

217

DOE Issues Final Environmental Impact Statement for the FutureGen 2.0  

Broader source: Energy.gov (indexed) [DOE]

Issues Final Environmental Impact Statement for the FutureGen Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois DOE Issues Final Environmental Impact Statement for the FutureGen 2.0 Project, Morgan County, Illinois October 25, 2013 - 2:48pm Addthis The U.S. Department of Energy has issued the Final Environmental Impact Statement (EIS) for the FutureGen 2.0 Project. The EIS evaluates the potential impacts associated with DOE's proposed action to provide financial assistance to the FutureGen Industrial Alliance (the Alliance) for the FutureGen 2.0 Project, including the direct and indirect environmental impacts from construction and operation of the proposed project. DOE's proposed action would provide approximately $1 billion of funding (primarily under the American Recovery and Reinvestment Act) to

218

EIS-0486: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the potential...

219

EA-1917: Notice of Availability of a Draft Environmental Assessment...  

Broader source: Energy.gov (indexed) [DOE]

Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for...

220

EA-1861: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to...

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EA-1922: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Environmental Assessment EA-1922: Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska This DOE Draft EA, in cooperation with RUS and the...

222

EIS-0376: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

223

EIS-0279: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

9: Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

224

EIS-0306: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

225

EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...  

Office of Environmental Management (EM)

Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

226

EIS-0271: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

227

EIS-0082-S2: Draft Environmental Impact Statement | Department...  

Energy Savers [EERE]

S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

228

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Broader source: Energy.gov (indexed) [DOE]

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

229

2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2013 Directory of Potential Stakeholders for DOE Actions under NEPA 2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued 2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued July 31, 2013 - 5:02pm Addthis 2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued The Stakeholder Directory, now in its 30th edition, identifies contacts in federal agencies; states, territories, and state government associations; and nongovernmental organizations for reviewing environmental impact statements and environmental assessments, and for other NEPA public involvement and consultation activities. The Directory is primarily intended to supplement lists that Departmental Offices compile for individual projects or facilities. Addthis Related Articles Obama Officials Announce Steps to Promote the Clean Energy Potential of the

230

2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued  

Broader source: Energy.gov (indexed) [DOE]

2013 Directory of Potential Stakeholders for DOE Actions under NEPA 2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued 2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued July 31, 2013 - 5:02pm Addthis 2013 Directory of Potential Stakeholders for DOE Actions under NEPA Issued The Stakeholder Directory, now in its 30th edition, identifies contacts in federal agencies; states, territories, and state government associations; and nongovernmental organizations for reviewing environmental impact statements and environmental assessments, and for other NEPA public involvement and consultation activities. The Directory is primarily intended to supplement lists that Departmental Offices compile for individual projects or facilities. Addthis Related Articles Secretary Chu Announces Efforts to Strengthen U.S. Electric Transmission

231

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Broader source: Energy.gov (indexed) [DOE]

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

232

DOE-2 Simulations for Cuero and Karnes County Prison Sites: Draft Progress Report  

E-Print Network [OSTI]

The intent of this project was to model each of the large buildings at the Karnes County 2,250 bed and Cuero 1,000 bed prison sites with the DOE-2 building energy simulation program and to deliver a working model to the Texas Department of Criminal...

Bou-Saada, T. E.; Munger, B. K.; Saman, N. F.; Haberl, J. S.

233

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

Request for Proposals Seeking a Contractor to Manage and Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility in Princeton, NJ. PPPL receives approximately $78 million annually from DOE. This is the first competition for a contractor in the history of the laboratory. The RFP describes the criteria DOE will use in selecting a successful future management and operating (M&O) contractor. Key criteria include:

234

DOE/ID-Number  

Broader source: Energy.gov (indexed) [DOE]

54 54 Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Draft November 2013 DOE/EA-1954 Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Draft November 2013 U.S. Department of Energy DOE Idaho Operations Office ii CONTENTS LIST OF FIGURES ..................................................................................................................... iii LIST OF TABLES....................................................................................................................... iv ACRONYMS .............................................................................................................................. v

235

Microsoft Word - MOTcmnts to DOE 7 12 10 master-final draft 2 clean.doc  

Broader source: Energy.gov (indexed) [DOE]

COMMENTS OF MOTOROLA, INC. Motorola, Inc. ("Motorola") hereby responds to the National Broadband Plan Request for Information (" NBP RFI") on the communications requirements of utilities, including but not limited to requirements for Smart Grid. 1 Motorola supports the efforts of the Department of Energy ("DOE") to fully assess utilities' requirements before the communications solutions for Smart Grid and other requirements are addressed. Based on Motorola's experience in providing communications systems for utilities, public safety, enterprise, and business users, as well as for commercial carriers and the general public, it is clear that there is no substitute for understanding the user needs first and then applying viable technology solutions to meet those needs.

236

Microsoft Word - Southern_Draft_Response_to_DOE_RFI_7-9-2010 _clean_.doc  

Broader source: Energy.gov (indexed) [DOE]

Before the Before the U.S. DEPARTMENT OF ENERGY Washington, DC 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy ) ) ) ) ) ) ) NBP RFI: Communications Requirements RESPONSE OF SOUTHERN COMPANY SERVICES, INC. Southern Company Services, Inc. ("Southern Company"), on behalf of itself and its operating affiliates, hereby submits its response to the Department of Energy's ("DOE's") Request for Information ("RFI"), released May 5, 2010, about current and projected communications requirements of electric utilities in "sustaining and

237

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

238

DOE Issues Guidance for "Other Transactions" | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance for "Other Transactions" Guidance for "Other Transactions" DOE Issues Guidance for "Other Transactions" November 15, 2005 - 12:42pm Addthis Provides Opportunity for Increased Industry Research Partnerships WASHINGTON, DC - On November 7, 2005, the Department of Energy (DOE) issued an interim final rule for the establishment of policies and procedures for a new "other transaction" authority. This authority allows DOE to remove barriers to commercial firms' participation in some of DOE's research programs, thus increasing opportunities for government-industry partnerships and private sector investment in the advancement of new technology. "This authority will increase and diversify the types of companies collaborating with the Department of Energy on scientific research,"

239

O:\IM-20\E-Government Program Office\FDMS\FDMS database\DOE\2011\DOE-HQ-2011-0014 - Daniel Cohen - GC\Comments from FDMS\Charles W Adams DRAFT-0005.html  

Broader source: Energy.gov (indexed) [DOE]

%20Daniel%20Cohen%20-%20GC/Comments%20from%20FDMS/Charles%20W%20Adams%20DRAFT-0005.html[3/23/2011 2:17:13 PM] %20Daniel%20Cohen%20-%20GC/Comments%20from%20FDMS/Charles%20W%20Adams%20DRAFT-0005.html[3/23/2011 2:17:13 PM] PUBLIC SUBMISSION As of: March 23, 2011 Received: March 21, 2011 Status: Pending_Post Tracking No. 80c0d05f Comments Due: April 04, 2011 Submission Type: Web Docket: DOE-HQ-2011-0014 Reducing Regulatory Burden Comment On: DOE-HQ-2011-0014-0001 Reducing Regulatory Burden Document: DOE-HQ-2011-0014-DRAFT-0005 Comment on FR Doc # 2011-02368 Submitter Information Name: Charles W Adams Address: A.O. Smith Corporation 11270 W. PARK PLACE MILWAUKEE, WI, 53224 Email: cadams@aosmith.com Phone: 414-359-4274 Organization: A.O. Smith Corporation General Comment I am commenting on behalf of A.O. Smith Water Products Company, the largest manufacturer of residential and commercial water heaters in the USA. We are members of the Air-conditioning,

240

Microsoft Word - WBRT_Comments_DOE_Transmission_Coordination_DRAFT _2_ _2_.doc  

Broader source: Energy.gov (indexed) [DOE]

Blvd., #105 | Lakewood, CO. 80228 | 303-216-9278 f: 303-496-0334 Blvd., #105 | Lakewood, CO. 80228 | 303-216-9278 f: 303-496-0334 info@westernroundtable.com | www.westernroundtable.com The opinions expressed in this letter represent the views of a majority of Roundtable Members, but not necessarily all of our members. October 20, 2008 Mr. John Schnagl Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 Re: Coordination of Federal Authorizations for Electric Transmission Facilities - (DOE, 10 CR Part 900, RIN 1901-AB18- Federal Register Vol. 73, no. 183, Friday, September 19, 2008) Dear Mr. Schnagl: The Western Business Roundtable ("Roundtable") respectfully submits the following comments

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Microsoft Word - USTelecom-DOE-Comments-DRAFT-2010-07-12.doc  

Broader source: Energy.gov (indexed) [DOE]

07 14th Street NW, Suite 400 * Washington, DC 20005-2164 * 202.326.7300 T * 202.326.7333 F * www.ustelecom.org 07 14th Street NW, Suite 400 * Washington, DC 20005-2164 * 202.326.7300 T * 202.326.7333 F * www.ustelecom.org July 12, 2010 U.S. Department of Energy Office of the General Counsel, 1000 Independence Avenue, SW. Room 6A245 Washington, DC 20585 Subject: Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy To Whom It May Concern: The United States Telecom Association (USTelecom) 1 is pleased to comment on the Request for Information (RFI) of the Department of Energy (DOE) in its proceeding 2 requesting input from the public regarding current and potential practices and policies to empower

242

Microsoft PowerPoint - DOE NEAC 13June2013 draft B  

Broader source: Energy.gov (indexed) [DOE]

Research Project FHR Overview Research Project FHR Overview for DOE Nuclear Energy Advisory Committee gy y Per Peterson (UCB), Charles Forsberg (MIT), Lin Win Hu (MIT) and Kumar Sridharan (UW) Lin-Win Hu (MIT), and Kumar Sridharan (UW) 13 June 2013 http://canes.mit.edu/sites/default/files/reports/ANP-147_1-2013_FHR-rpt.pdf Fl id S l C l d 2 Fluoride Salt-Cooled High-Temperature Reactor (FHR) Reactor (FHR) General Electric S-PRISM The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again. The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav

243

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

244

EA-1948: Draft Environmental Assessment | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1948: Draft Environmental Assessment Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. EA-1948-DEA-2013.pdf More Documents & Publications CX-007149: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination

245

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Broader source: Energy.gov (indexed) [DOE]

Northeast Reliability Interconnect DEIS Northeast Reliability Interconnect DEIS S-1 August 2005 SUMMARY S.1 BACKGROUND S.1.1 Purpose and Need for National Environmental Policy Act Review Executive Order (E.O.) 10485 (September 9, 1953), as amended by E.O. 12038 (February 7, 1978), requires that a Presidential permit be issued by the U.S. Department of Energy (DOE) before electric transmission facilities may be constructed, operated, maintained, or connected at the U.S. international border. Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit, 345,000-volt (345-kV) alternating-current (AC) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine.

246

DOE Issues Agency Information Collection Extension for OE-417 Form in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) has issued an Agency Information Collection Extension in the Federal Register, notifying the public of an information collection extension and requesting public comments on the revised Form OE-417 "Electric Emergency Incident and Disturbance Report" which is used to report electric emergency incidents and disturbances to DOE. The OE-417 reports enable the DOE to monitor electric emergency incidents and disturbances in the United States so that the Government may help prevent the physical or virtual disruption of the operation of any critical infrastructure.

247

DOE Issues Request for Information for Scope Requirements Planning at Los Alamos National Laboratory  

Broader source: Energy.gov [DOE]

Cincinnati – The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI) seeking 8(a) small business concerns with the capabilities to provide architect-engineer-like services to support a potential upcoming Environmental Management (EM) procurement at Los Alamos National Laboratory (LANL).

248

DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for support services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak Ridge, Tennessee. The total estimated value of the contract is $100 Million - $300 Million.

249

DOE Issues 2 Requests for Information on Low-Cost Hydrogen Production and Delivery  

Broader source: Energy.gov [DOE]

The US DOE's FCTO has issued two RFIs seeking feedback from the research community and relevant stakeholders about hydrogen production and hydrogen delivery RD&D activities aimed at developing technologies that can ultimately produce and deliver low-cost hydrogen.

250

DOE Issues Solicitation for Purchase of Oil for the Strategic Petroleum  

Broader source: Energy.gov (indexed) [DOE]

Issues Solicitation for Purchase of Oil for the Strategic Issues Solicitation for Purchase of Oil for the Strategic Petroleum Reserve DOE Issues Solicitation for Purchase of Oil for the Strategic Petroleum Reserve March 16, 2007 - 11:37am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it will seek solicitations to purchase up to four million barrels of crude oil for the Strategic Petroleum Reserve (SPR). This is the first of a series of solicitations planned to replace 11 million barrels of oil sold in the fall of 2005 after Hurricane Katrina disrupted refinery supplies. This would be the first direct purchase of crude oil for the reserve since 1994. The Strategic Petroleum Reserve will use the proceeds from the emergency sale totaling $584 million to complete the purchases.

251

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

its Ames Laboratory its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory June 29, 2006 - 2:48pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames Laboratory, a DOE Office of Science (SC) research facility in Ames, Iowa. This competition for a contractor is the first in the history of the laboratory. Ames is a laboratory that has been funded at approximately $30 million annually by the Office of Science, other government agencies, and private industry. "Ames Laboratory provides leadership in basic research across a broad spectrum of science, with great expertise in biology, chemistry, physics

252

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Broader source: Energy.gov (indexed) [DOE]

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

253

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Broader source: Energy.gov (indexed) [DOE]

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

254

DOE Issues Two Notices Seeking Comment on the Implementation of Its  

Broader source: Energy.gov (indexed) [DOE]

Two Notices Seeking Comment on the Implementation of Its Two Notices Seeking Comment on the Implementation of Its Certification and Enforcement Rules DOE Issues Two Notices Seeking Comment on the Implementation of Its Certification and Enforcement Rules April 21, 2011 - 5:08pm Addthis Last week, the Department of Energy issued two Notices related to the application of its certification and enforcement regulations. First, the Department issued a Request for Information seeking information and data related to the use of computer simulations, mathematical methods, and other alternative methods of determining the efficiency of certain types of consumer products and commercial and industrial equipment. Comments are requested on or before May 18, 2011. Second, the Department issued a Notice of Proposed Rulemaking tentatively proposing an 18-month

255

DOE's Idaho National Lab Issues Request for Proposals for Engineering and  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Lab Issues Request for Proposals for Idaho National Lab Issues Request for Proposals for Engineering and Design on NGNP DOE's Idaho National Lab Issues Request for Proposals for Engineering and Design on NGNP July 26, 2006 - 4:37pm Addthis Services Will Guide R&D on Next Generation Reactor WASHINGTON, DC. - In an important step forward for the Next Generation Nuclear Plant (NGNP) project, the U.S. Department of Energy's Idaho National Laboratory today issued a Request for Proposals (RFP) for engineering services in support of development of NGNP. This RFP is for pre-conceptual engineering and design services to assist in focusing the technical scope and principles of research and development on the next generation reactor, and to provide a basis for subsequent development of the technical and functional specifications for the prototype facilities.

256

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

Argonne National Laboratory Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office of Science multi-program research facility located near Chicago, Illinois. "Argonne lab contributes expert scientists and unique leadership in basic research, which helps the U.S. maintain our global competitiveness," said Office of Science Director, Dr. Raymond L. Orbach. "Through this contracting process, DOE seeks the best possible management of this

257

DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

Landmark Rule for Risk Insurance for Advanced Nuclear Landmark Rule for Risk Insurance for Advanced Nuclear Facilities DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities May 8, 2006 - 10:36am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) issued on Saturday, the interim final rule required by the Energy Policy Act of 2005 (EPACT) for risk insurance to facilitate construction of new advanced nuclear power facilities. The rule establishes the requirements for risk insurance to cover costs associated with certain regulatory or litigation-related delays in the start-up of new nuclear power plants. The resurgence of nuclear power is a key component of President Bush's Advanced Energy Initiative. The Standby Support provisions of EPACT (section 638), also referred to as federal risk insurance, authorize the Secretary of Energy to enter into

258

Identifying and Resolving Issues in EnergyPlus and DOE-2 Window Heat Transfer Calculations  

SciTech Connect (OSTI)

Issues in building energy software accuracy are often identified by comparative, analytical, and empirical testing as delineated in the BESTEST methodology. As described in this report, window-related discrepancies in heating energy predictions were identified through comparative testing of EnergyPlus and DOE-2. Multiple causes for discrepancies were identified, and software fixes are recommended to better align the models with the intended algorithms and underlying test data.

Booten, C.; Kruis, N.; Christensen, C.

2012-08-01T23:59:59.000Z

259

Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

260

DOE issues Finding of No Significant Impact on Environmental Assessment for  

Broader source: Energy.gov (indexed) [DOE]

issues Finding of No Significant Impact on Environmental issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site DOE issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site December 21, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 Idaho Falls, ID - After completing a careful assessment, the U.S. Department of Energy has determined that building a new facility at its Idaho National Laboratory site for continued disposal of remote-handled low level radioactive waste generated by operations at the site will not have a significant impact on the environment. "A new disposal facility at INL for this type of waste will be built in a

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

Fermi National Accelerator Laboratory Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S. maintain global competitiveness," said Under Secretary for Science, Dr.

262

Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements (DOE/EIS-0385) (05/26/06)  

Broader source: Energy.gov (indexed) [DOE]

399 Federal Register 399 Federal Register / Vol. 71, No. 102 / Friday, May 26, 2006 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6675-6] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202-564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in the Federal Register dated April 7, 2006 (71 FR 17845). Draft EISs EIS No. 20060042, ERP No. D-NPS- E65079-TN, Great Smoky Mountains National Park General Management

263

Cost estimate and economic issues associated with the MOX option (prior to DOE`s record of decision)  

SciTech Connect (OSTI)

Before the January 1997 Record of Decision (ROD), the U.S. Department of Energy Office of Fissile Materials Disposition (DOE-MD) evaluated three technologies for the disposition of {approximately}50 MT of surplus plutonium from defense-related programs-reactors, immobilization, and deep boreholes. As part of the process supporting the ROD, and comprehensive assessment of technical viability, cost, and schedule was conducted by DOE-MD and its national laboratory contractors. Oak Ridge National Laboratory managed and coordinated the life-cycle cost (LCC) assessment effort for this program. This report discusses the economic analysis methodology and the results for the reactor options considered prior to ROD. A secondary intent of the report is to discuss major technical and economic issues that impact cost and schedule. To evaluate the economics of the reactor option and other technologies on an equitable basis, a set of cost-estimating guidelines and a common cost-estimating format were utilized by all three technology teams. This report includes the major economic analysis assumptions and the comparative constant-dollar and discounted-dollar LCCs for all nine reactor scenarios.

Reid, R.L.; Miller, J.W.

1997-04-01T23:59:59.000Z

264

DOE/EIS-0357D-S1: Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (12/26/06)  

Broader source: Energy.gov (indexed) [DOE]

EIS-0357D-S1 EIS-0357D-S1 SUPPLEMENT TO THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE GILBERTON COAL-TO-CLEAN FUELS AND POWER PROJECT GILBERTON, PENNSYLVANIA December 2006 U.S. DEPARTMENT OF ENERGY i COVER SHEET December 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Supplement to the Draft Environmental Impact Statement for the Gilberton Coal -to-Clean Fuels and Power Project (DOE/EIS-0357D-S1) LOCATION Gilberton, Pennsylvania CONTACTS Additional copies or information concerning this Supplement to the Draft Environmental Impact Statement (EIS) can be obtained from Ms. Janice L. Bell, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-4512.

265

DOE/EIS-0305-D; Draft Environmental Impact Statement for Treating Transuranic/Alpha Low-Level Waste at the Oak Ridge National Laboratory Oak Ridge, Tennessee (February 2000)  

Broader source: Energy.gov (indexed) [DOE]

05-D 05-D DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) FOR TREATING TRANSURANIC (TRU)/ALPHA LOW-LEVEL WASTE AT THE OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE February 2000 TRU Waste Treatment Project, DRAFT Environmental Impact Statement COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (EIS) for Treating Transuranic (TRU)/Alpha Low-Level Waste at the Oak Ridge National Laboratory, Oak Ridge, Tennessee CONTACT: For further information on this document, write or call: Dr. Clayton Gist, Waste Management Integration Team Leader U.S. Department of Energy Oak Ridge Operations 55 Jefferson Avenue P. O. Box 2001 Oak Ridge, TN 37831 Telephone: (865) 241-3498 * Facsimile: (865) 576-5333 * E-Mail: gistcs@oro.doe.gov

266

Draft Enivonmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

267

Cross-cutting Issues Working Session | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Cross-cutting Issues Working Session Cross-cutting Issues Working Session Advanced Scientific Computing Research (ASCR) ASCR Home About Research Applied Mathematics Computer Science Exascale Tools Workshop Programming Challenges Workshop Architectures I Workshop External link Architectures II Workshop External link Next Generation Networking Scientific Discovery through Advanced Computing (SciDAC) Computational Science Graduate Fellowship (CSGF) ASCR SBIR-STTR Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) News & Resources Contact Information Advanced Scientific Computing Research U.S. Department of Energy SC-21/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-7486 F: (301) 903-4846 E: sc.ascr@science.doe.gov More Information »

268

NETL: News Release - DOE Issues Plan for Developing Ultra-Clean  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 27, 2001 January 27, 2001 DOE Issues Plan for Developing Ultra-Clean Transportation Fuels Workshops Also Scheduled for February to Plan Upcoming Competition for Supporting Science, Enabling Technologies PITTSBURGH, PA - With several initiatives underway to develop a new generation of "ultra-clean" transportation fuels, the Department of Energy has issued a document describing its overall strategy and plans for dramatically reducing pollution from tomorrow's cars and trucks through advances in technology. In a related action, the department's National Energy Technology Laboratory, which is coordinating much of the government's ultra-clean fuels research program, is planning three public workshops in February to begin identifying the key fundamental science and technology needs of the fuels industry and how federal programs can best address them.

269

DOE Issues Solicitation for Purchase of Oil for the Strategic Petroleum  

Broader source: Energy.gov (indexed) [DOE]

Solicitation for Purchase of Oil for the Strategic Solicitation for Purchase of Oil for the Strategic Petroleum Reserve DOE Issues Solicitation for Purchase of Oil for the Strategic Petroleum Reserve March 16, 2007 - 11:37am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it will seek solicitations to purchase up to four million barrels of crude oil for the Strategic Petroleum Reserve (SPR). This is the first of a series of solicitations planned to replace 11 million barrels of oil sold in the fall of 2005 after Hurricane Katrina disrupted refinery supplies. This would be the first direct purchase of crude oil for the reserve since 1994. The Strategic Petroleum Reserve will use the proceeds from the emergency sale totaling $584 million to complete the purchases. "The Strategic Petroleum Reserve is a critical national asset that bolsters

270

Microsoft Word - NR DRAFT RFP WIPP M&O APR 1 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 1, 2011 April 1, 2011 william.taylor@emcbc.doe.gov DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million per year, for five years, with an option to extend the contract for an additional five years. DOE anticipates awarding a competitive, cost-plus- award-fee contract during 2012. The overall mission of the WIPP and the National TRU program is to protect human health and the

271

Notice of Availability of the Draft Environmental Assessment for the Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada (DOE/EA-1566) (July 6, 2006)  

Broader source: Energy.gov (indexed) [DOE]

391 Federal Register 391 Federal Register / Vol. 71, No. 129 / Thursday, July 6, 2006 / Notices disposal of government personal property. (5) Respondents: 176. (6) Estimated Number of Burden Hours: 3,960. Statutory Authority: Department of Energy Organization Act, Public Law 95-91. Issued in Washington, DC on June 28, 2006. Sharon A. Evelin, Director, Records Management Division, Office of the Chief Information Officer. [FR Doc. E6-10561 Filed 7-5-06; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Notice of Availability of the Draft Environmental Assessment for the Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada AGENCY: U.S. Department of Energy. ACTION: Notice of Availability. SUMMARY: This notice announces the availability, and the opportunity for

272

Nuclear Waste Disposal Plan Drafted  

Science Journals Connector (OSTI)

Nuclear Waste Disposal Plan Drafted ... Of all the issues haunting nuclear power plants, that of disposing of the radioactive wastes and spent nuclear fuel they generate has been the most vexing. ...

1984-01-09T23:59:59.000Z

273

Draft Complex Transformation Supplemental Programmatic Environmental Impact Statement (DOE/EIS-0236-S4) (1/11/08)  

Broader source: Energy.gov (indexed) [DOE]

3 Federal Register 3 Federal Register / Vol. 73, No. 8 / Friday, January 11, 2008 / Notices Commission's Rules of Practice and Procedure. (G) The Secretary is directed to publish a copy of this order in the Federal Register. (H) The refund effective date in Docket No. EL08-8-000 established pursuant to section 206(b) of the Federal Power Act is 5 months from the date of the filing of the complaint. By the Commission. Kimberly D. Bose, Secretary. [FR Doc. E8-301 Filed 1-10-08; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Draft Complex Transformation Supplemental Programmatic Environmental Impact Statement AGENCY: National Nuclear Security Administration, U.S. Department of Energy. ACTION: Notice of Availability and Public Hearings.

274

GRR/Elements/18-CA-c.13 to 18-CA-c.14 - Does the RWQCB Issue a Waste  

Open Energy Info (EERE)

to 18-CA-c.14 - Does the RWQCB Issue a Waste to 18-CA-c.14 - Does the RWQCB Issue a Waste Discharge Permit < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 18-CA-c.13 to 18-CA-c.14 - Does the RWQCB Issue a Waste Discharge Permit If the RWQCB adopts the WDRs, it issues the developer a WDR Permit. The WDR Permit is valid until the project no longer discharges or until revoked by the RWQCB. Logic Chain No Parents \V/ GRR/Elements/18-CA-c.13 to 18-CA-c.14 - Does the RWQCB Issue a Waste Discharge Permit (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/18-CA-c.13_to_18-CA-c.14_-_Does_the_RWQCB_Issue_a_Waste_Discharge_Permit&oldid=480725

275

DRAFT --DRAFT --DRAFT --DRAFT --DRAFT --Esodyp+: Prefetching in the Jackal Software DSM  

E-Print Network [OSTI]

DRAFT -- DRAFT -- DRAFT -- DRAFT -- DRAFT -- Esodyp+: Prefetching in the Jackal Software DSM-based Distributed Shared Memory (DSM) systems and discuss its implementation. In contrast to page-based DSMs, an object-based DSM distributes data on the level of objects, rendering current prefetchers for page

Genaud, Stéphane

276

O:\IM-20\E-Government Program Office\FDMS\FDMS database\DOE\2012\Document List 03-02-2012 10-10-11-600\Document List 03-02-2012 10-10-11-600_docs\DOE-HQ-2012-0004-DRAFT-0005.html  

Broader source: Energy.gov (indexed) [DOE]

5.html[2/3/2012 12:41:43 PM] 5.html[2/3/2012 12:41:43 PM] PUBLIC SUBMISSION As of: February 03, 2012 Received: January 17, 2012 Status: Pending_Post Tracking No. 80f99189 Comments Due: January 20, 2012 Submission Type: Web Docket: DOE-HQ-2012-0004 U.S. Department of Energy Audit Guidance: For-Profit Recipients Comment On: DOE-HQ-2012-0004-0001 Audit Guidance: For-Profit Recipients Document: DOE-HQ-2012-0004-DRAFT-0005 Comment on FR Doc # 2011-32622 Submitter Information Name: Carol Hellmann Address: US Dept of Energy 1617 Cole Blvd Golden, CO, 80401 Email: carol.hellmann@go.doe.gov Phone: 7203561529 Organization: Golden Field Office Government Agency Type: Federal Government Agency: DOE General Comment I read through the new draft. I think it addresses many of the questions that I had. The one thing I

277

EIS-0375: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0375: Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Draft...

278

EA-1919: Notice of Availability of a Draft Programmatic Environmental  

Broader source: Energy.gov (indexed) [DOE]

Availability of a Draft Programmatic Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating from Radiological Areas DOE announces the availability for public review and comment of the Draft Programmatic Environmental Assessment (PEA) for the Recycling of Scrap Metals Originating from Radiological Areas. This Draft PEA for the Recycling of Scrap Metals Originating from Radiological Areas analyzes the potential environmental impacts associated with resuming the clearance of scrap metal, originating from DOE radiological areas, for recycling pursuant to improved procedures designed to assure that clearance for release is limited to metals meeting stringent criteria. This Draft PEA

279

Draft Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site.  

Broader source: Energy.gov (indexed) [DOE]

SRS-WD-2010-001 SRS-WD-2010-001 Revision 0 Draft Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site September 30, 2010 Draft Basis for Section 3116 Determination DOE/SRS-WD-2010-001 for Closure of F-Tank Farm Revision 0 at the Savannah River Site September 30, 2010 Page ii REVISION SUMMARY REV. # DESCRIPTION DATE OF ISSUE 0 Initial Issue 09/30/2010 Draft Basis for Section 3116 Determination DOE/SRS-WD-2010-001 for Closure of F-Tank Farm Revision 0 at the Savannah River Site September 30, 2010 Page iii TABLE OF CONTENTS Page REVISION SUMMARY ................................................................................................................................. ii LIST OF TABLES .........................................................................................................................................

280

Draft Environmental Impact Statement for the Disposal of Greater-Than-Class  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement for the Disposal of Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste February 18, 2011 - 12:00pm Addthis WASHINGTON - The Department of Energy (DOE) has issued a Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste (LLRW) and GTCC-Like Waste (DOE/EIS-0375D, Draft EIS) as required under the National Environmental Policy Act for public review and comment. GTCC LLRW consists of a small volume of low-level radioactive waste generated throughout the United States as the result of Nuclear Regulatory Commission (NRC) and Agreement State licensed activities, including

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Enforcement Guidance Supplement 98-02, DOE Enforcement Activities where Off-site Transporation Issues are also Present  

Broader source: Energy.gov (indexed) [DOE]

EGS:98-02 Appendix E - Operational Procedures for Enforcement Department of Energy Washington, DC 20585 December 15, 1998 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to time with respect to the processes used in its enforcement activities. Recently several questions have arisen regarding the scope of Price-Anderson

282

Microsoft Word - Southern Reply Comment Draft 08-09-2010 re DOE NBP RFI Communications.doc  

Broader source: Energy.gov (indexed) [DOE]

BEFORE THE BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 In the Matter of ) ) Implementing the National Broadband ) NBP RFI: Communications Requirements Plan by Studying the Communications ) Requirements of Electric Utilities to ) Inform Federal Smart Grid Policy ) REPLY COMMENTS OF SOUTHERN COMPANY SERVICES, INC. Southern Company Services, Inc. ("Southern"), on behalf of itself and its operating affiliates, hereby submits its reply comments in response to the Department of Energy's ("DOE's") Request for Information ("RFI"), released May 5, 2010, about current and projected communications requirements of electric utilities. 1 Southern appreciates the opportunity to provide DOE with additional information and to respond to the initial comments submitted in

283

DRAFT - DOE O 452.2C, Security and Use Control of Nuclear Explosives and Nuclear Weapons  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes requirements to implement the nuclear explosive security and use control (UC) elements of DOE O 452.1D, Nuclear Explosive and Weapon Surety (NEWS) Program, to ensure authorized use, when directed by proper authority, and protect against deliberate unauthorized acts (DUAs), deliberate unauthorized use (DUU), and denial of authorized use (DAU).

284

DRAFT - DOE O 329.2, Excepted Service Authority for Exceptionally Well Qualified (EWQ) EQ Pay Plan Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for the employment and compensation of individuals when using the following DOE excepted service authority: Section 313 division D of the Consolidated Appropriations Act of 2014 (Public Law 113-76), hereafter referred to as appointment authority EWQ and pay plan EQ.

285

Responses to Public Comments on Draft Vitrification Melter Evaluation  

Broader source: Energy.gov (indexed) [DOE]

Comments on Draft WVDP Vitrification Melter WIR Evaluation Comments on Draft WVDP Vitrification Melter WIR Evaluation 1 To provide greater transparency to the Department of Energy's (DOE) cleanup of nuclear legacy waste, DOE made the "West Valley Demonstration Project Draft Waste Incidental to Reprocessing Evaluation for the Vitrification Melter" (Draft WIR Evaluation) available for public and state review and comment and Nuclear Regulatory Commission (NRC) consultation review. The public comments on the Draft WIR Evaluation were submitted to DOE by one individual and two organizations:  Raymond C. Vaughan, PhD.,  The West Valley Citizen Task Force, and  The Coalition on West Valley Nuclear Wastes.

286

Agencies extend deadline for draft Record of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy Idaho Department of Energy Idaho News Release For Immediate Release Date: June 2, 2008 Media Contact: Danielle Miller, (208) 526-5709 Agencies extend deadline for draft Record of Decision for Radioactive Waste Management Complex remediation The U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA) and the Idaho Department of Environmental Quality (DEQ) have further extended the deadline for completing a draft Record of Decision (ROD) for the radioactive and hazardous waste landfill remediation project at DOE's Idaho cleanup site until June 30, 2008 in order to complete the necessary consultations and analysis of the public comments on the proposed plan. On April 1, 2008 the agencies extended the deadline for the first time to June 2, 2008. Under the original agreement, DOE was to submit the draft Record of Decision to the state of Idaho and EPA for review by March 31, 2008. In October 2007, the agencies issued a proposed plan for public comment outlining the preferred alternative for addressing buried radioactive and hazardous waste at the Radioactive Waste Management Complex (RWMC). DOE proposed expanding current targeted waste exhumations at the landfill to 4.8 acres. The state of Idaho awaited public comments before determining the appropriate acreage for waste retrieval.

287

DOE/EIS-0250D; Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy (DOE) U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada CONTACT: For more information on this Environmental Impact Statement (EIS), write or call: Wendy R. Dixon, EIS Project Manager Yucca Mountain Site Characterization Office Office of Civilian Radioactive Waste Management U.S. Department of Energy P.O. Box 30307, Mail Stop 010 North Las Vegas, Nevada 89036-0307 Telephone: (800) 967-3477 The EIS is also available on the Internet at the Yucca Mountain Project website at http://www.ymp.gov and on the DOE National Environmental Policy Act (NEPA) website at http://tis.eh.doe.gov/nepa/. For general information on the DOE NEPA process, write or call:

288

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present  

Broader source: Energy.gov (indexed) [DOE]

December 15, 1998 December 15, 1998 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present. Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to time with respect to the processes used in its enforcement activities. Recently several questions have arisen regarding the scope of Price-Anderson enforcement when transportation issues are directly or indirectly involved in an incident. These questions can be separated into two areas,

289

Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)  

SciTech Connect (OSTI)

This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

None

1992-09-18T23:59:59.000Z

290

EPA Notice of Availability of the Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems (DOE/EIS-0373D) (07/01/05)  

Broader source: Energy.gov (indexed) [DOE]

32 32 Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices Severity and Resistance to Control, Amador Ranger District, Eldorado National Forest, Amado County, CA,Wait Period Ends: 08/01/2005, Contact: Patricia Ferrell 530-642- 5146. EIS No. 20050264, Draft EIS, NPS, ID, Minidoka Internment National Monument (Former Minidoka Relocation Center) , General Management Plan, Implementation, Jerome County, ID, Comment Period Ends: 09/19/2005, Contact: Neil King 208-837-4793. EIS No. 20050265, Final EIS, NPS, AZ, Chiricahua National Monument Fire Management Plan (FMP), Implementation, AZ, Wait Period Ends: 08/01/2005, Contact: Alan Whalon 520-824-3560. EIS No. 20050266, Draft EIS, DOE, 00, Proposed Consolidation of Nuclear Operations Related to Production of

291

DOE Technical Standards Program: Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy Technical Standards Procedures Department of Energy Technical Standards Procedures Office of Nuclear Safety The following procedures should be used to write, revise, or maintain a DOE technical standard. They are also used to convert a DOE technical standard to a non-government standard or to form a topical committee. Table of Contents (TSPP-00) Program Overview and Responsibilities (TSPP-01) Initiating DOE Technical Standards (TSPP-02) Use of Voluntary Consensus Standards and Interaction with Standards Development Organizations (TSPP-03) Developing DOE Technical Standard (TSPP-04) Coordination of Technical Standards (TSPP-05) - Draft In Concurrence Resolution - TSPP-06-2009 is the currently approved TSPP that addresses coordination of DOE Technical Standards. Approving and Issuing DOE Technical Standards (TSPP-06)

292

DOE/EIS-0287 Idaho High-Level Waste & Facilities Disposition Draft Environmental Impact Statement (December 1999)  

Broader source: Energy.gov (indexed) [DOE]

HLW & FD EIS HLW & FD EIS 3-13 DOE/EIS-0287D Calcine storag e i n b i n s ets Calcine storag e i n b i n s et s Cesium ion exchange & grouting Cesium ion exchange & grouting NWCF* NWCF* Calcine Mixed transuranic waste/SBW Mixed transuranic waste/NGLW Low-level waste disposa l*** disposa l*** Tank heels Transuranic waste (from tank heels) * * * * Mixed transuranic waste/ NGLW Mixed transuranic waste/ NGLW M i x e d t r a nsuran ic w a s t e / M i x e d t r a nsuran ic w a s t e / S B W s t o rage in Ta n k F a r m S B W s t o rage in Ta n k F a r m Low-leve l waste Low-leve l waste FIGURE 3-2. Continued Current Operations Alternative. LEGEND * Including high-temperature and maximum achievable control technology upgrades. Mixed transuranic waste/ newly generated liquid waste New Waste Calcining Facility ** Calcine would be transferred from bin set #1 to bin set #6 or #7.

293

EA-1972: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power Administration issued...

294

EA-1969: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment Clark Fork River Delta Restoration Project, Bonner County, Idaho Bonneville Power Administration issued a draft EA that analyzes the potential effects of a proposal to...

295

EA-1945: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft EA that assesses the potential environmental...

296

EIS-0495: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Chinook Hatchery Program; Milton-Freewater, Oregon, and Dayton, Washington Bonneville Power Administration issued a Draft EIS that analyzes the potential environmental impacts of...

297

Draft Voluntary Code of Conduct Available for Public Comment...  

Energy Savers [EERE]

comment on DOE's draft Voluntary Code of Conduct which addresses data privacy surrounding smart grid technologies. Comments must be received on or before October 14, 2014. In...

298

EIS-0284: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

299

EA-1903: Notice of Availability of Draft Environmental Assessment...  

Energy Savers [EERE]

of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the availablity of...

300

EIS-0403-S1: Supplement to the Draft Programmatic Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EA-1922: Notice of Availability of a Draft Environmental Assessment...  

Energy Savers [EERE]

EA-1922: Notice of Availability of a Draft Environmental Assessment Combined Power and Biomass Heating System, Fort Yukon, Alaska DOE, in cooperation with RUS and the Denali...

302

EA-1919: Notice of Availability of a Draft Programmatic Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating from Radiological Areas DOE announces the availability...

303

EA-1809: Notice of Availability of a Draft Environmental Assessment...  

Broader source: Energy.gov (indexed) [DOE]

Assessment EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces...

304

Public invited to comment on Draft Environmental Assessment for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

invited to comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials NOTICE: DOE has extended the public comment period...

305

Microsoft Word - INL_EXT-10-20208 DOE-Cooling Water Issues &...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

reliability matters, assisted by industry. Much of the work on water issues facing the electricity industry is being done by the private sector. In many cases, this should...

306

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

307

DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal of Greater-Than-Class (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (February 2011)  

Broader source: Energy.gov (indexed) [DOE]

Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D) February 2011 SUMMARY ENERGY U.S. DEPARTMENT OF U.S. D E P A R T M E N T O F E N E R G Y On the cover: The photographs on the front cover are, from left to right: glove boxes contaminated with GTCC Other Waste, abandoned Am-241 and Cs-137 gauges and shipping shields, and disused well logging sources being loaded into a 55-gallon drum. COVER SHEET Lead Agency: U.S. Department of Energy (DOE) Cooperating Agency: U.S. Environmental Protection Agency (EPA) Title: Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D)

308

DOE017-0153  

Broader source: Energy.gov (indexed) [DOE]

5525 5525 DOE017-0153 ,-.or/ N"( - ./,'-'S MaryBeth Zimmerman 02/14/2001 11:08AM / -- T ' ,44 L - ( _w _1_'- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .I f . J To: Kenneth Friedman/EE/DOE@DOE, Peggy Podolak/EE/DOE@DOE, Linda Silverman/EE/DOE@DOE, Ed Wall/EE/DOE@DOE, David RodgerslEE/DOE@DOE, Jerry DionlEE/DOE@DOE, Gail McKinley/EE/DOE@DOE. Lawrence MansuetifEE/DOE@DOE cc: John Sullivan/EE/DOE@DOE. Darrell Beschen/EEIDOE@DOE, Michael York/EE/DOE@DOE, Buddy GarlandlEEIDOE@DOE, Nancy Jefferv/EEIDOE@DOE, Joel Rubin/EE/DOE@DOE. Sam Baldwin/EE/DOE@DOE, IEE-ADAS Subject: FW: NEP Draft outline Directions on NEP Assessment paper. Please read all of this very carefully before proceeding: Product Schedule: * Inputs due from sectors to Planning: COB on Thursday (sorry) o Due from EERE to Policy Office: noon on Friday

309

DOE Issues Final Rule for Alternative Efficiency Determination Methods and Alternative Rating Methods  

Broader source: Energy.gov [DOE]

The Department of Energy has issued a pre-publication Federal Register final rule revising its existing regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air-conditioning, water heating, and refrigeration equipment.

310

DOE Issues Final Request for Proposal for Portsmouth Gaseous Diffusion Plant Support Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy today issued a Final Request for Proposal (RFP), for the continued performance of infrastructure support services at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio.

311

DOE Issues Request for Proposal for Services at Los Alamos National...  

Energy Savers [EERE]

was released on the procurement website: https:www.emcbc.doe.govSEBLANLNRDAindex.php. Today's RFP will be located on the same website. In early 2008, the State of New...

312

DOE Seeks Small Businesses for Paducah Gaseous Diffusion Plant Infrastructure Support Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking eligible small businesses under North American Industry Classification System (NAICS) Code 561210, Facilities Support Services, for the performance of infrastructure support services at the Paducah Gaseous Diffusion Plant (PGDP).

313

DOE Seeks Small Businesses for Portsmouth Gaseous Diffusion Plant Infrastructure Support Services  

Broader source: Energy.gov [DOE]

Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking eligible small businesses under North American Industry Classification System (NAICS) Code 561210, Facilities Support Services, for the performance of infrastructure support services at the Portsmouth Gaseous Diffusion Plant (PORTS), Portsmouth, Ohio.

314

DOE Solar Decathlon: News Blog » Blog Archive » Transportation Issues  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transportation Issues Challenge Teams on the Second Day of Assembly Transportation Issues Challenge Teams on the Second Day of Assembly Tuesday, September 24, 2013 By Richard King On the second day of assembly, everyone seems to be settling in for the long haul. Either they were exhausted from working 18 hours straight on Monday or the adrenalin of the first day excitement had worn off. Either way, there was a constant but steadier pace to the work today. The U.S. Department of Energy Solar Decathlon is a marathon, not a sprint, and the teams understand that. Photo of two decathletes wearing hard hats, safety glasses, and safety vests. Safety is our number one priority. Here, two members of the Vienna University of Technology team display their safety equipment, including noise protection for drilling. In general, significant progress was made in the past 36 hours. Only a few

315

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

316

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

317

EA-1488: Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

318

Rad Monioring Subgroup Draft 1 Work Plan 020408  

Broader source: Energy.gov (indexed) [DOE]

1 of 3 1 of 3 (Draft) Work Plan for the DOE TEC Rail Topic Group Radiation Monitoring Sub-Group Status: Active TEC Stakeholder Leads: Marty Vyenielo (PA/NE Task Force), Cort Richardson (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: October 4, 2007 Purpose: The Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) provides stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for

319

Draft Supplemental Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

320

TRIBAL ISSUES TOPIC GROUP CONFERENCE CALL SUMMARY (April 26,  

Broader source: Energy.gov (indexed) [DOE]

CONFERENCE CALL SUMMARY (April 26, CONFERENCE CALL SUMMARY (April 26, 2000) Participants: Jessica Alcorn (DOE/EM), Kevin Blackwell (DOT), Judith Bradbury (PNL), Stephanie Bush-Goddard (NRC), Kevin Clarke (DOE/RL), Martha Crosland (DOE/EM), Tony Dipalo (NRC), Spiros Droggitis (NRC), Dorothy Gauch (NRC), Ken Gray (CTUIR), Robert Holden (NCAI), Judith Holm (DOE/NTPA), Preston Kinne (Kootenai/NTEC), Carol Peabody (DOE/EM), Wilda Portner (SAIC), Greg Sahd (DOE/WIPP), Heather Westra (Prairie Island Indian Community), J. R. Wilkinson (CTUIR), Jon Wright (DOE/EM) Issues discussed during this call included: Action Items from the February meeting in Las Vegas, NV; status of latest draft of DOE Indian Policy; DOT/FRA Rail Inspection Letter update; NRC ANPR on Tribal Prenotification; recent State and Tribal Government Group (STGWG)

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Chapter 3_Consolidated_DRAFT  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement March 2013 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Volume 1: Environmental Analyses DOE/EIS-0451 HOOPER SPRINGS TRANSMISSION PROJECT Draft Environmental Impact Statement DOE/EIS - 0451 Bonneville Power Administration Cooperating Agencies U.S. Department of Agriculture, Forest Service, Caribou-Targhee National Forest U.S. Department of Interior, Bureau of Land Management Idaho Office of Energy Resources March 2013 Hooper Springs Transmission Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agencies: U.S. Department of Agriculture, Forest Service (USFS), Caribou-Targhee National Forest (C-TNF); U.S. Department of Interior, Bureau of Land Management (BLM); Idaho Office of Energy Resources

322

Does  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Does Does the cellulose-binding module move on the cellulose surface? Yu-San Liu Æ Yining Zeng Æ Yonghua Luo Æ Qi Xu Æ Michael E. Himmel Æ Steve J. Smith Æ Shi-You Ding Received: 26 November 2008 / Accepted: 11 May 2009 / Published online: 19 June 2009 Ó Springer Science+Business Media B.V. 2009 Abstract Exoglucanases are key enzymes required for the efficient hydrolysis of crystalline cellulose. It has been proposed that exoglucanases hydrolyze cellulose chains in a processive manner to produce primarily cellobiose. Usually, two functional modules are involved in the processive mechanism: a catalytic module and a carbohydrate-binding module (CBM). In this report, single molecule tracking techniques were used to analyze the molecular motion of CBMs labeled with quantum dots (QDs) and bound to cellulose crystals. By tracking the single QD, we observed that the family 2 CBM from

323

Draft Environmental Impact Statement Available for Public Review |  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step forward in cleaning up the site. The document, entitled "Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D (Revised)), is a revision of the 1996 Cleanup and Closure

324

Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0350)(5/15/03)  

Broader source: Energy.gov (indexed) [DOE]

96 96 Federal Register / Vol. 68, No. 94 / Thursday, May 15, 2003 / Notices [FR Doc. 03-12161 Filed 5-14-03; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy, National Nuclear Security Administration. ACTION: Notice of availability and public hearings. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), and the DOE Regulations Implementing NEPA (10 CFR part 1021), the National Nuclear Security Administration (NNSA), an agency

325

Salmon Creek Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

326

DOE Seeks Comment on Application of Clothes Washer Test Procedure |  

Broader source: Energy.gov (indexed) [DOE]

Seeks Comment on Application of Clothes Washer Test Procedure Seeks Comment on Application of Clothes Washer Test Procedure DOE Seeks Comment on Application of Clothes Washer Test Procedure June 30, 2010 - 3:02pm Addthis Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer a warm rinse option that is not included in the recommended cycle for washing cotton or linen clothes. The Department is soliciting feedback from the public on the draft interpretive rule, which is available here, until July 30, 2010. Addthis Related Articles DOE Seeks Comment on Definition of Showerhead Save Energy and More with ENERGY STAR. ENERGY STAR clothes washers use 50% less energy to wash clothes than standard washing machines.

327

DOE Seeks Comment on Application of Clothes Washer Test Procedure |  

Broader source: Energy.gov (indexed) [DOE]

Application of Clothes Washer Test Procedure Application of Clothes Washer Test Procedure DOE Seeks Comment on Application of Clothes Washer Test Procedure June 30, 2010 - 3:02pm Addthis Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer a warm rinse option that is not included in the recommended cycle for washing cotton or linen clothes. The Department is soliciting feedback from the public on the draft interpretive rule, which is available here, until July 30, 2010. Addthis Related Articles Save Energy and More with ENERGY STAR. ENERGY STAR clothes washers use 50% less energy to wash clothes than standard washing machines. Tips: Laundry DOE Solicits Views on the Implementation of Large-Capacity Clothes Washer

328

DOE  

Gasoline and Diesel Fuel Update (EIA)

DOE DOE /E/A- 0202( 83//Q J Sh or t-T er m En er gy O ut lo ok a to m Quar terly Proje ction s Febru ary 1983 Ene rgy Info rma tion Adm inist ratio n Was hing ton, D.C. t rt jrt .or t lor t lor t .lor t- ior t- ior t <.o rt ort . m .er m -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -T erm -T erm -T erm Nrm ue rgy En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y ^n erg y Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Ou tlo ok Sh ort -T erm 1 Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm Sh ort -T erm

329

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

330

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

331

DOE 5700.6C, 10CFR830.120, DOE-ER-STD-6001-92, and Covey-based TQM: A historical perspective on current issues in research environments  

SciTech Connect (OSTI)

Three years ago there were no standards or published guidelines for quality in research environments. Today, one standard has been published, and three guidelines documents are in final draft form and about to be published. In this paper, I describe the events that led to the writing of DOE 5700.6C, 10CFR830.120, and DOE-ER-STD-6001-92, focusing on the cultural barriers that arose (largely in the community of quality assurance professionals) during this process. I go on to describe why I believe that implementing DOE 5700.6C and 10CFR830.120 must be pushed even further toward an approach that embodies the Malcolm Baldrige National Quality Award and why even this is not far enough. The reason is because the most crucial aspect of successfully implementing a quality initiative is to base it on a cohesive, unified foundation of organizational and individual values and beliefs. Stephen Covey`s 7 Habits of Highly Effective People and Principle Centered Leadership provide such a foundations.

Bodnarczuk, M.

1994-06-01T23:59:59.000Z

332

Notice of Availability of the Moab Uranium Mill Tailings Remediation Draft Environmental Impact Statement (DOE/EIS-0355) (11/12/04)  

Broader source: Energy.gov (indexed) [DOE]

27 27 Federal Register / Vol. 69, No. 218 / Friday, November 12, 2004 / Notices Pursuant to 40 CFR 1506.9. EIS No. 040512, Draft EIS, BLM, ID, Fire, Fuels and Related Vegetation Management Direction Plan Amendment, Upper Snake River District (The District), Amending 12 Existing Land Use Plans, Several Counties, ID, Comment Period Ends: February 10, 2005, Contact: Eric Limbach (208) 478-6392. EIS No. 040513, Final EIS, BLM, CA, King Range National Conservation Area (KRNCA) Resource Management Plan, Implementation, Humboldt and Mendocino Counties, CA, Wait Period Ends: December 13, 2004, Contact: Lynda J. Roush (707) 825-2300. EIS No. 040514, Final EIS, AFS, AK, Resurrection Creek Stream and Riparian Restoration Project, Proposes to Accelerate the Recovery of Riparian

333

Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement (DOE/EIS-0317) (January 10, 2003)  

Broader source: Energy.gov (indexed) [DOE]

8 8 Federal Register / Vol. 68, No. 7 / Friday, January 10, 2003 / Notices authorized to administer the NPDES Program incur a burden of 92,033 hours annually. Dated: January 6, 2003. James A. Hanlon, Director, Office of Wastewater Management. [FR Doc. 03-516 Filed 1-9-03; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6636-6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed December 30, 2002 Through January 03, 2003 Pursuant to 40 CFR 1506.9. EIS No. 030000, DRAFT EIS, FHW, TX, TX-121 Highway from Interstate Highway 30 to Farm-to-Market 1187 (FM 1187) in Forth Worth,

334

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Broader source: Energy.gov (indexed) [DOE]

Draft Advanced Nuclear Energy Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS DRAFT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION...

335

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

336

regarding the 04/07/08 Draft Regional Dialogue Load Following...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

legal counsel for the Western Public Agencies Group (WPAG) and Northwest Requirements Utilities (NRU) are working with BPA staff to resolve issues presented by the draft Regional...

337

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

338

Biomass 2014 Draft Agenda | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Biomass 2014 Draft Agenda Biomass 2014 Draft Agenda The following document is a draft agenda for the Biomass 2014: Growing the Future Bioeconomy conference. Biomass 2014 Draft...

339

EIS-0353: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0353: EPA Notice of Availability of the Draft Environmental Impact Statement South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana EIS No. 040274, Draft EIS, DOE, MT, South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Preserve the Genetic Purity of the Westslope Cutthroat Trout Population, Flathead National Forest, Flathead River, Flathead, Powell and Missoula Counties, Montana DOE/EIS-0353 Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Montana, 69 FR 34161 (June 2004) More Documents & Publications

340

EA-1705: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan The frontier Project consists of the design, construction and operation of a biorefinery producing ethanol and other co-products from cellulosic materials utilizing a proprietary pretreatment and fermentation process. Draft Environmental Assessment and Notice of Wetland Involvement for the Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan, DOE/EA-1705 (February 2011) More Documents & Publications EA-1705: Final Environmental Assessment EA-1705: Finding of No Significant Impact Pacific Ethanol, Inc

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

342

EIS-0403: EPA Notice of Availability of the Draft Programmatic  

Broader source: Energy.gov (indexed) [DOE]

Notice of Availability of the Draft Programmatic Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0403: EPA Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Notice of Availability, Draft Environmental Impact Statement: Programmatic-Solar Energy Development in Six Southwestern States. Notice of Availability, Draft Environmental Impact Statement: Programmatic-Bureau of Land Management Solar Energy Program, DOE/EIS-0403 (December 2010 - 75 FR 78992) More Documents & Publications EIS-0455: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0455: Notice of Adoption of an Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental

343

EIS-0450: EPA Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the environmental review, also announce the availability of the Draft EIS. EIS-0450-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of Final Environmental Impact

344

Draft-O-Meter  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will learn an easy technique to measure the presence of drafts in their homes and classrooms.

345

O:\IM-20\E-Government Program Office\FDMS\FDMS database\DOE\2012\Document List 03-02-2012 10-10-11-600\Document List 03-02-2012 10-10-11-600_docs\Robin Hindel_ Comment -DRAFT-0003.html  

Broader source: Energy.gov (indexed) [DOE]

Robin%20Hindel_%20Comment%20-DRAFT-0003.html[2/3/2012 12:39:35 PM] Robin%20Hindel_%20Comment%20-DRAFT-0003.html[2/3/2012 12:39:35 PM] PUBLIC SUBMISSION As of: February 03, 2012 Received: January 11, 2012 Status: Pending_Post Tracking No. 80f93029 Comments Due: January 20, 2012 Submission Type: Web Docket: DOE-HQ-2012-0004 U.S. Department of Energy Audit Guidance: For-Profit Recipients Comment On: DOE-HQ-2012-0004-0001 Audit Guidance: For-Profit Recipients Document: DOE-HQ-2012-0004-DRAFT-0003 Comment on FR Doc # 2011-32622 Submitter Information Name: Robin Hindel Address: 6065 Strip Ave NW NW N Canton, OH, 44270 Email: robin.hindel@rrfcs.com Phone: 330-491-4845 Organization: Rolls-Royce Fuel Cell Systems (US) Inc Government Agency Type: Federal Government Agency: DOE General Comment As with any new requirement, the first year of implementation of the new compliance audit

346

Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

347

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network [OSTI]

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

348

TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY JULY 13, 1999 Crowne  

Broader source: Energy.gov (indexed) [DOE]

JULY 13, 1999 Crowne JULY 13, 1999 Crowne Plaza Center City Hotel, Philadelphia, PA Kevin Blackwell (U.S. Department of Transportation/Federal Rail Administration) (DOT/FRA) presented an overview of the topic group's discussion. The status of the DOT/FRA's response to DOE's inquiry about the tribal right to inspect rail shipments is still an open issue. At the time of the July meeting, the response was in the final stages of review in the Secretary of Transportation's Legal Division. The response will be forwarded to DOE's Office of Civilian Radioactive Waste Management. The draft response is an

349

DOE/EIS-0464D  

Broader source: Energy.gov (indexed) [DOE]

DOE/EIS-0464D O ce of Fossil Energy National Energy Technology Laboratory U.S. Department of Energy Lake Charles Carbon Capture and Sequestration Project Draft Environmental Impact Statement This page left blank intentionally. COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Title: Lake Charles Carbon Capture and Sequestration Project, Draft Environmental Impact Statement (DOE/EIS-0464D) Location: Lake Charles, Louisiana located in Calcasieu Parish and West Hastings Oil Field,

350

NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)  

Broader source: Energy.gov [DOE]

The Council on Environmental Quality (CEQ), in collaboration with the California Governor’s Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

351

EIS-0286: Revised Draft Environmental Import Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

6: Revised Draft Environmental Import Statement 6: Revised Draft Environmental Import Statement EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington The revised draft of the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. DOE/EIS-0286, Richland Operations Office, Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington - Summary (March 2003) EIS-0286-D2-DEIS-01-2003.pdf EIS-0286-D2-DEIS-02-2003_0.pdf More Documents & Publications

352

EA-1954: Draft Environmental Assessment | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4: Draft Environmental Assessment 4: Draft Environmental Assessment EA-1954: Draft Environmental Assessment Resumption of Transient Testing of Nuclear Fuels and Materials at the Idaho National Laboratory, Idaho This EA evaluates the potential environmental impacts associated with DOE's proposed action to resume transient testing at INL's Transient Reactor Test Facility reactor approximately 38 miles west of Idaho Falls, Idaho or to start transient testing at SNL's Annular Core Research Reactor in Albuquerque, New Mexico. The draft EA identifies INL as the preferred location and describes DOE's reasons for identifying INL as the preferred location. EA-1954-DEA-2013.pdf More Documents & Publications EIS-0281: Draft Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement

353

West Valley Melter Draft Waste Evaluation Released for Public Comment |  

Broader source: Energy.gov (indexed) [DOE]

Melter Draft Waste Evaluation Released for Public Melter Draft Waste Evaluation Released for Public Comment West Valley Melter Draft Waste Evaluation Released for Public Comment March 11, 2011 - 12:00pm Addthis Media Contact Bill Taylor (513) 246-0539 william.taylor@emcbc.doe.gov West Valley, New York - The U.S. Department of Energy today released a Draft Waste Incidental to Reprocessing (WIR) Evaluation of a vitrification melter at the West Valley Demonstration Project (WVDP) for review and comment by the public, states and Nuclear Regulatory Commission (NRC). This draft evaluation shows that the melter meets the criteria for "waste incidental to reprocessing" and may be managed and disposed of as low-level radioactive waste (LLW). It is an important step in DOE's efforts to clean up the WVDP and meet its obligations under the WVDP Act of

354

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

355

DOE Standard: Fire protection design criteria  

SciTech Connect (OSTI)

The development of this Standard reflects the fact that national consensus standards and other design criteria do not comprehensively or, in some cases, adequately address fire protection issues at DOE facilities. This Standard provides supplemental fire protection guidance applicable to the design and construction of DOE facilities and site features (such as water distribution systems) that are also provided for fire protection. It is intended to be used in conjunction with the applicable building code, National Fire Protection Association (NFPA) Codes and Standards, and any other applicable DOE construction criteria. This Standard replaces certain mandatory fire protection requirements that were formerly in DOE 5480.7A, ``Fire Protection``, and DOE 6430.1A, ``General Design Criteria``. It also contains the fire protection guidelines from two (now canceled) draft standards: ``Glove Box Fire Protection`` and ``Filter Plenum Fire Protection``. (Note: This Standard does not supersede the requirements of DOE 5480.7A and DOE 6430.1A where these DOE Orders are currently applicable under existing contracts.) This Standard, along with the criteria delineated in Section 3, constitutes the basic criteria for satisfying DOE fire and life safety objectives for the design and construction or renovation of DOE facilities.

Not Available

1999-07-01T23:59:59.000Z

356

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

357

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

358

EIS-0250-S1: Draft Supplemental Environmental Impact Statement...  

Office of Environmental Management (EM)

generated at 72 commercial and 4 DOE sites would be shipped to the repository by rail (train), although some shipments would arrive at the repository by truck. The Draft...

359

Statement of Vernon Daub, Acting Manager of DOEs Carlsbad Field...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

For Immediate Release Statement of Vernon Daub, Acting Manager of DOE's Carlsbad Field Office, Regarding New Mexico Environment Department's Issuance of a Draft Hazardous Waste...

360

Measure Guideline: Combustion Safety for Natural Draft Appliances Through Appliance Zone Isolation  

SciTech Connect (OSTI)

This measure guideline covers how to assess and carry out the isolation of natural draft combustion appliances from the conditioned space of low-rise residential buildings. It deals with combustion appliances located either within the living space in enclosed closets or side rooms or outside the living space in an adjacent area like an attic or garage. This subset of houses does not require comprehensive combustion safety tests and simplified prescriptive procedures can be used to address safety concerns. This allows residential energy retrofit contractors inexperienced in advanced combustion safety testing to effectively address combustion safety issues and allow energy retrofits including tightening and changes to distribution and ventilation systems to proceed.

Fitzgerald, J.; Bohac, D.

2014-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Strategic principles workshops: Discussion drafts and workshop notes  

SciTech Connect (OSTI)

The Office of Civilian Radioactive Waste-Management in the Department of Energy (DOE) is responsible for disposing of this nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and the quality of the environment. Although embodied in the Federal repository program that began with studies in the late 1950s, this mission was explicitly established by the Nuclear Waste Policy Act of 1982 and reaffirmed by the Nuclear Waste Policy Amendments Act of 1987. To fulfill our mission, we are developing a waste management system consisting of a geologic repository for permanent disposal deep beneath the surface of the earth, a facility for monitored retrievable storage, and a system for transporting the waste. This discussion draft was developed to help involve parties affected by or interested in the waste-management program in the formulation of the basic principles on which the program will be based. It reviews existing objectives, policies, and strategic principles under which the system is currently being developed. Then discussed are issues of strategic importance for which additional strategic principles may be needed. For these issues in particular, views from affected and interested parties is solicited, but comments regarding alternative approaches to the issues presented as well as suggestions for additional issues will also be welcome. Finally, background information on the waste-management program pertinent to the issues discussion is presented.

NONE

1991-09-01T23:59:59.000Z

362

PRELIMINARY DRAFT  

Broader source: Energy.gov (indexed) [DOE]

40 40 FINAL 09-033(E)/100511 Environmental Assessment Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee Date Issued⎯October 2011 U. S. Department of Energy Oak Ridge Office Oak Ridge, Tennessee FINDING OF NO SIGNIFICANT IMPACT TRANSFER OF LAND AND FACILITIES WITHIN THE EAST TENNESSEE TECHNOLOGY PARK AND SURROUNDING AREA OAK RIDGE, TENNESSEE AGENCY: U. S. Department of Energy ACTION: Finding of No Significant Impact. SUMMARY: The U. S. Department of Energy (DOE) has completed an Environmental Assessment (EA) (DOE/EA-1640) for the conveyance (lease, easement, and/or title transfer) of DOE property located at the East Tennessee Technology Park (ETTP) and surrounding area for mixed use economic

363

PRELIMINARY DRAFT  

Broader source: Energy.gov (indexed) [DOE]

TRANSFER OF LAND AND FACILITIES WITHIN THE EAST TENNESSEE TECHNOLOGY PARK AND SURROUNDING AREA OAK RIDGE, TENNESSEE AGENCY: U. S. Department of Energy ACTION: Finding of No Significant Impact. SUMMARY: The U. S. Department of Energy (DOE) has completed an Environmental Assessment (EA) (DOE/EA-1640) for the conveyance (lease, easement, and/or title transfer) of DOE property located at the East Tennessee Technology Park (ETTP) and surrounding area for mixed use economic development. Leases, easements, and/or title transfers could be entered into with the Community Reuse Organization of East Tennessee (CROET), city of Oak Ridge, other agencies, or private entities. Leasing and title transfers for economic development are allowed under 10 Code of Federal Regulations (CFR)

364

DRAFT OUTLINE  

Broader source: Energy.gov (indexed) [DOE]

DOE/E A - 1884 Yuma County, Colorado U. S. Department of Energy Western Area Power Administration December 2012 Wray Wind Energy Project Environmental Assessment For DOE/E A - 1884 Yuma County, Colorado U. S. Department of Energy Western Area Power Administration December 2012 THIS P AGE INTENTIONALLY BLAN K Table of Contents Table of Contents i W ray W ind Energy Project EA TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................ 1 -1 1.1 BACKG RO UND .................................................................................................................................1.1-1 1.2 PURPOS E AND NEED ........................................................................................................................1.2-1

365

California Energy Commission DRAFT STAFF REPORT  

E-Print Network [OSTI]

California Energy Commission DRAFT STAFF REPORT ACHIEVING ENERGY SAVINGS IN CALIFORNIA BUILDINGS CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Governor #12;CALIFORNIA ENERGY COMMISSION Betty Chrisman of the California Energy Commission prepared this report. As such, it does not necessarily represent the views

366

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present.  

Broader source: Energy.gov [DOE]

Recently several questions have arisen regarding the scope of Price-Anderson enforcement when transportation issues are directly or indirectly involved in an incident. These questions can be separated into two areas, (1) transportation issues that involve on-site transportation typically not regulated by the Department of Transportation (DOT), and (2) transportation issues that involve off-site transportation. This guidance addresses off-site transportation that is regulated by DOT and other state and federal agencies.

367

Notice of Availability and Public Hearing: Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft EIS (DOE/EIS-0377)  

Broader source: Energy.gov (indexed) [DOE]

843 Federal Register 843 Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices conference be held to address the issues raised by Colorado Interstate Gas Company's (CIG) August 31, 2007, tariff filings to revise its fuel tracking mechanism and to update the calculation of its cash-out Index Price and cash-out System Index Price (collectively, cash-out prices). Commission Staff and parties will have the opportunity to discuss all of the issues raised by CIG's proposals to modify its fuel and LUF mechanism and to adjust its cash-out price calculations. Specifically, CIG should be prepared to address all the concerns raised in the protests, and if necessary, to provide additional technical, engineering and operational support for its proposals. Any party proposing alternatives to

368

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Broader source: Energy.gov (indexed) [DOE]

F-1 F-1 APPENDIX F PROJECT HISTORY Waste History/Description From 1970 through the early 1980's the Idaho National Engineering and Environmental Laboratory (INEEL) accepted over 65,000 cubic meters of transuranic (TRU) and alpha- contaminated waste from other U.S. Department of Energy (DOE) sites. These wastes were placed in above ground storage at the Radioactive Waste Management Complex (RWMC) on the INEEL. The wastes are primarily laboratory and processing wastes of various solid materials, including paper, cloth, plastics, rubber, glass, graphite, bricks, concrete, metals, nitrate salts, and absorbed liquids. Over 95 percent of the waste was generated at DOE's Rocky Flats Plant in Colorado and transported to the INEEL by rail in bins, boxes, and drums. All 65,000 cubic meters was

369

EIS-0385: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0385: Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve As required by the Energy Policy Act of 2005 (P.L. 109-58), DOE would expand the SPR to its full authorized 1 billion-barrel capacity by selecting additional storage sites. DOE would develop one new site or a combination of two new sites, and would expand capacity at two or three existing sites. Storage capacity would be developed by solution mining of salt domes and disposing of the resulting salt brine by ocean discharge or underground injection. New pipelines, marine terminal facilities, and other infrastructure could also be required. DOE has prepared this draft EIS to address the environmental impacts of the proposed expansion of the capacity

370

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

371

EIS-0464: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture and Sequestration (ICCS) Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60

372

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement

373

Draft Site-Wide Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Site-Wide Environmental Impact Statement Site-Wide Environmental Impact Statement for the Y-12 National Security Complex October 2009 U.S. Department of Energy National Nuclear Security Administration Y-12 Site Office DOE/EIS-0387 COVER SHEET RESPONSIBLE AGENCY: United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) TITLE: Draft Site-wide Environmental Impact Statement for the Y-12 National Security Complex (DOE/EIS-0387) (Draft Y-12 SWEIS) CONTACT: For further information on this SWEIS, For general information on the DOE contact: National Environmental Policy Act (NEPA) process, contact: Pam Gorman Carol Borgstrom, Director Y-12 SWEIS Document Manager Office of NEPA Policy and Compliance, GC-20 Y-12 Site Office U.S. Department of Energy

374

PRELIMINARY DRAFT  

Broader source: Energy.gov (indexed) [DOE]

64 64 FINAL 10-056(E)/061411 Environmental Assessment Spruce and Peatland Responses Under Climatic and Environmental Change Experiment (SPRUCE) Marcell Experimental Forest, Itasca County, Minnesota Date Issued⎯June 2011 U.S. Department of Energy Oak Ridge Office Oak Ridge, Tennessee Cooperating Agency: U.S. Forest Service 11-038(E)/052011 1 DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT SPRUCE AND PEATLAND RESPONSES UNDER CLIMATIC AND ENVIRONMENTAL CHANGE EXPERIMENT (SPRUCE) CHIPPEWA NATIONAL FOREST MARCELL EXPERIMENTAL FOREST ITASCA COUNTY, MINNESOTA I. SUMMARY The U.S. Department of Energy (DOE) has completed an Environmental Assessment (EA) [DOE/EA-1764] for the Spruce and Peatland Responses Under Climatic and Environmental Change Experiment (SPRUCE).

375

Draft General Conformity Determination  

Broader source: Energy.gov (indexed) [DOE]

I I Draft General Conformity Determination U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix I Draft General Conformity Determination Draft General Conformity Determination Cape Wind Energy Project Prepared by Minerals Management Service Herndon, VA November 2008 i TABLE OF CONTENTS 1.0 INTRODUCTION TO THE PROPOSED ACTION............................................................... 1 2.0 GENERAL CONFORMITY REGULATORY BACKGROUND .......................................... 2 2.1 GENERAL CONFORMITY REQUIREMENTS.................................................................... 2 2.2 GENERAL CONFORMITY APPLICABILITY.....................................................................

376

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

377

Energy Department Releases Draft Advanced Fossil Energy Solicitation to  

Broader source: Energy.gov (indexed) [DOE]

Releases Draft Advanced Fossil Energy Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution Energy Department Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution July 2, 2013 - 12:42pm Addthis NEWS MEDIA CONTACT (202) 586-4940 Washington, D.C. - As part of President Obama's Climate Action Plan, the U.S. Department of Energy announced today a draft loan guarantee solicitation for innovative and advanced fossil energy projects and facilities that substantially reduce greenhouse gas and other air pollution. The Advanced Fossil Energy Projects solicitation, authorized by Title XVII of the Energy Policy Act of 2005 through Section 1703 of the Loan Guarantee Program, does just that. The draft solicitation will be open

378

Public Invited to Comment on Draft Environmental Assessment for the  

Broader source: Energy.gov (indexed) [DOE]

Public Invited to Comment on Draft Environmental Assessment for the Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials November 12, 2013 - 4:33pm Addthis Tim Jackson Public Affairs, U.S. Department of Energy Idaho Operations Office NOTICE: DOE has extended the public comment period on its Draft Environmental Assessment for Resumption of Transient Testing of Nuclear Fuels and Materials to January 10, 2014. The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared for a proposal to resume transient testing of nuclear fuels and materials at either Idaho National

379

EA-1814: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1814: Draft Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System, Montpelier, Vermont The U.S. Department of Energy (DOE) is proposing to provide Federal funding through the Community Renewable Energy Deployment Program to the City of Montpelier for the design, permitting, and construction of a combined heat and power (CHP) and district energy system. This Draft EA analyzes the foreseeable environmental impacts of the proposed project and the alternative of not implementing this project (the No-Action Alternative), including the construction of a new heat plant and district energy system within a 100 year floodplain. Draft Environmental Assessment for City of Montpelier Combined Heat and

380

EIS-0442: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah This Draft EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. It evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx EIS-0442: Draft Environmental Impact Statement More Documents & Publications

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Broader source: Energy.gov (indexed) [DOE]

C-1 C-1 APPENDIX C SETTLEMENT AGREEMENT Public Service Co. of Colorado v. Batt and United States v. Batt UNITED STATES COURTS DISTRICT OF IDAHO OCT 17 1995 8:34 A.M. REC'D ______ LODGED FILED ______ UNITED STATES COURTS DISTRICT OF IDAHO SETTLEMENT AGREEMENT The State of Idaho, through the Attorney General and Governor Philip E. Batt in his official capacity; the Department of-Energy, through the General Counsel and Assistant Secretary for Environmental Management; and the Department of the Navy, through the General Counsel and Director, Naval Nuclear Propulsion Program, hereby agree on this 16th day of October, 1995, to the following terms and conditions to fully resolve all issues in the actions Public Service Co. of Colorado v. Batt, No. CV 91-0035-S-EJL (D. Id.) and United States v. Batt, No.

382

Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (12/01/06))  

Broader source: Energy.gov (indexed) [DOE]

62 Federal Register 62 Federal Register / Vol. 71, No. 231 / Friday, December 1, 2006 / Notices Route to Construct and Reconstruct Roads, Funding, NPDES Permit and U.S. Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA. Summary: EPA expressed environmental concerns about water resource impacts, and requested that information about water resources be updated. EPA is also expressed concern about monitoring and mitigation issues. Rating EC2. EIS No. 20060347, ERP No. D-BLM- L70014-ID, Cottonwood Resource Management Plan, Implementation, Latah, Clearwater, Nez Perce, Lewis, Idaho and Adams Counties, ID. Summary: EPA expressed environmental concerns about water quality/source water protection impacts and monitoring/maintaining old growth

383

Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present  

Broader source: Energy.gov [DOE]

Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to...

384

DRAFT REVISION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary of Changes To Procedure 200.1-5 Records Disaster Prevention, Mitigation, and Recovery Procedure Revised Version Issued as P 200.1-5B LM Procedure 200.1-5, Records Disaster Prevention, Mitigation, and Recovery Procedure of 1/19/07, has undergone revisions. The procedure has been revised to reflect changes in definitions and formatting and updates to the attached Plan. Please replace LM Procedure 200.1-5A with LM Procedure 200.1-5B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents.

385

DRAFT REVISION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

-2 -2 Processing Inactive Records Revised Version Issued as P 200.2-2B LM Procedure 200.2-2A, Processing Internal Inactive Records for Storage of 7/18/07, has undergone revision. The revised procedure includes updated references, definitions, and formatting. Please replace LM Procedure 200.2-2A with LM Procedure 200.2-2B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. Procedure 200.2-2B INITIATED BY: Office of Business Operations NO. OF PAGES/ATTACHMENTS: 10 pages, 4 attachments U.S. Department of Energy

386

DRAFT REVISION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4-1 4-1 Records Management Self-Assessment Revised Version Issued as P200.4-1B LM Procedure 200.4-1, Records Management Self-Assessment of 4/17/07, has undergone minor revisions. The procedure has been revised to reflect changes in definitions and formatting. Please replace LM Procedure 200.4-1A with LM Procedure 200.4-1B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. INITIATED BY: Office of Business Operations NO. OF PAGES/ATTACHMENTS: 8 pages, 2 attachments U.S. Department of Energy

387

DRAFT REVISION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary of Changes Summary of Changes to Procedure 243.1 Records Inventory Revised Version Issued as P 243.1B LM Procedure 243.1A, Records Inventory of 7/18/07, has undergone minor revisions. The procedure has been revised to reflect changes in definitions and formatting and to ensure the references cited and associated forms remain current. Please replace LM Procedure 243.1A with LM Procedure 243.1B. The most recent and official controlled hard copy version of this document resides with LM's Directives Coordinator. An electronic version of the controlled document has been placed on the LM Intranet for employee use. Printed hard copies of this electronic version are considered uncontrolled documents. INITIATED BY: Office of Business Operations NO. OF PAGES/ATTACHMENTS: 9 pages, 3 attachments

388

Draft AGENDA  

Broader source: Energy.gov (indexed) [DOE]

Adviso Adviso y Committee Meeting r L'Enfant Plaza Hotel Quorum Room- 1 st Floor Washington, D.C. 20024 June 15, 2011 8:30 a.m. Continental Breakfast NEAC members 9:00 a.m. Welcome and Opening Remarks Chairman Bill Martin and Dr. Pete Lyons, NE-1 9:15 a.m. America's Energy Challenges: DOE-QTR Dr. Steven Koonin, S-4 Under Secretary for Science 9:30 a.m. NE FY2011 Budget Dr. Lyons, NE-1 10:00 a.m. Status of NE New Starts Dr. Lyons, NE-1 10:45 a.m. Break 11:00 a.m. Nuclear Reactor Technology Dr. Michael Corridini NGNP Final Report Subcommittee Chair 12:00 noon Lunch (NEAC members and Montcalm Room- 1 st Floor Presenters only) 1:30 p.m. Fuel Cycle Research and Development Report Dr. Burton Richter,

389

DRAFT MEMORANDUM  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Services Group Ernest Orlando Lawrence Berkeley National Laboratory One Cyclotron Road |Berkeley, California 94720 |Tel: 510.486.4332 |Fax: 510.486-6603 |e-mail:ekborglin@lbl.gov February 27, 2009 NOTICE California Idling Policy for Off-road Diesel Vehicles To all operators of Lawrence Berkeley National Laboratory in-use off-road diesel vehicles: The following requirements apply to in-use, off-road diesel powered vehicles: * No vehicle or engine subject to the in-use off-road diesel regulation may idle for more than 5 consecutive minutes. The idling limits took effect on June 15, 2008, the day that the off-road diesel regulation became effective under California law. * The idling limit does not apply to: (1) idling when queuing, (2) idling to verify that the

390

Draft Agenda  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

National Lab Fuel Cell Deployment Meeting National Lab Fuel Cell Deployment Meeting September 20-21, 2007 http://www.eere.energy.gov/hydrogenandfuelcells/usfcc_meeting/ Argonne National Laboratory * Advanced Photon Source Facility 9700 South Cass Avenue * Argonne, IL 60439 USA Day 1 Morning Session o 8:30 - 8:40 AM: Welcome and Introductions Dr. JoAnn Milliken, Program Manager, DOE Hydrogen Program Anthony Androsky, Deputy Executive Director, U.S. Fuel Cell Council o 8:40 - 10:10: Current Technology Capability 1) Buildings and Facility Power - Robert Berger, Govt. Sales Manager, Plug Power; and Andy Skok, Executive Director Strategic Marketing, FuelCell Energy 2) Portable and Back-up Power - Jerry Hallmark, Motorola Labs 3) Specialty Vehicles and Material Handling Equipment - Bill Mitchell, Vice President,

391

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS–0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

392

Federal On-Site Renewable Power Purchasing Issues  

Broader source: Energy.gov (indexed) [DOE]

On-Site Renewable On-Site Renewable Power Purchasing Issues Tracy Logan, FEMP (202) 586-9973 tracy.logan@ee.doe.gov Chandra Shah, NREL (303) 384-7557 chandra.shah@nrel.gov Overview * OMB Memo Summary * Issue Paper Development * Termination * ESPC PPA Update CEQ/OMB Memo Summary * 8/16/11: Supporting Energy and Sustainability Goal Achievement Through Efficiency and Deployment of Clean Energy Technology * Encourages Agencies to use ESPCs and UESCs and requests Agencies report ESPCs and UESCs to FEMP * Requests review of all types of PPAs Issue Paper Development * FEMP is drafting papers on deployment issues * Purpose: to provide a central point of information * Proposed papers: interconnection, rebates & incentives, termination, others? * Please email suggested topics to Tracy & Chandra

393

DOE Comments on Radioactive Waste | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

on Radioactive Waste DOE Comments on Radioactive Waste 1. Summary Comments on Draft Branch Technical Position on a Performance Assessment Methodology for Low-Level Radioactive...

394

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

395

EIS-0488: Notice of Availability Draft Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

488: Notice of Availability Draft Environmental Impact 488: Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. EIS-0488-DEIS-NOA-2014.pdf More Documents & Publications

396

EA-1806: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Draft Environmental Assessment 6: Draft Environmental Assessment EA-1806: Draft Environmental Assessment Libman Company Wind Energy Project Arcola, Douglas County, Illinois The U.S. Department of Energy (DOE) has provided a grant to the State of Illinois and is proposing to authorize the expenditure of Federal funding to design, permit, and construct the Libman Wind Energy Project, a proposed 1.5 megawatt (MW) wind turbine to be located north of the Libman manufacturing facility in Arcola, Douglas County, Illinois. Draft Environmental Assessment for the Libman Company Wind Energy Project Arcola, Douglas County, Illinois, DOE/EA-1806 (November 2010) More Documents & Publications EA-1804: Final Environmental Assessment EA-1859: Final Environmental Assessment EA-1818: Final Environmental Assessment

397

EA-1792: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This EA evaluates the environmental impacts of the Proposed Action and the No-Action Alternative; identifies unavoidable adverse environmental impacts of the Proposed Action; describes the relationship between local short-term uses of the environment and the maintenance and enhancement of long-term productivity; and characterizes any irreversible and irretrievable commitments of resources that would be involved should DOE decide to implement its Proposed Action. Draft Environmental Assessment for University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, DOE/EA-1792 (May

398

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

399

EA-1867: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1867: Draft Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE prepared this Draft EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's total $171.8 million funding for the proposed project would be provided from funds authorized in the American Recovery and Reinvestment Act of 2009 (Public Law 111-5, 123 Stat. 115). RTI's

400

EIS-0423: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0423: Draft Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury DOE proposes to construct one or more new facilities and/or select one or more existing facilities (including modification as needed) for the long-term management and storage of mercury, as mandated by Section 5 of the Act. Any such facility must comply with applicable requirements of Section 5 of the Act, "Management Standards for a Facility," including the requirements of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901 et seq.) and other permitting requirements. Draft Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement, DOE/EIS-0423D (January 2010)

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EIS-0488: EPA Notice of Availability of Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

488: EPA Notice of Availability of Draft Environmental Impact 488: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is

402

EA-1080: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1080: Draft Environmental Assessment Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System This environmental assessment (EA) evaluates the potential impacts of a proposed demonstration project to be cost-shared by DOE and NOXSO Corporation under the terms of Clean Coal Technology (CCT) Demonstration Program. The project would demonstrate the NOXSO flue gas treatment technology, which is designed to reduce sulfur dioxide (SO2) and nitrogen oxides (NOX) emissions from existing coal-fired electric generating units. Draft Environmental Assessment for the Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications EA-1080: Finding of No Significant Impact

403

EIS-0396: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

6: Draft Programmatic Environmental Impact Statement 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained production of nuclear-generated electricity, while reducing the impacts associated with spent nuclear fuel disposal and reducing proliferation risks. The Department of Energy (DOE) proposed action envisions changing the United States nuclear energy fuel cycle from an open (or once-through) fuel

404

DOE issues Finding of No Significant Impact on the Disposition of Five Signature Properties at Idaho National Laboratory  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) has determined that tearing down four World War II-era historic structures and part of another structure at Idaho National Laboratory’s Central Facilities Area that remain from when the area served as the U.S. Naval Proving Ground will not have a significant impact on the environment.

405

EIS-0378: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to Bonneville Power Administration (BPA), another organizational unit within DOE, for interconnection into the federal transmission system. EIS-0378-DEIS-Summary-2007.pdf

406

Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

NONE

1995-03-31T23:59:59.000Z

407

Draft National Electric Transmission Congestion Study Now Available for Public Comment  

Broader source: Energy.gov [DOE]

The Department of Energy has issued a Notice of Public Comment in the Federal Register, inviting the public to comment on the draft National Electric Transmission Congestion Study. The draft study is now available for review and downloading at http://www.energy.gov/node/942311. The public comment period will close on October 20, 2014. After reviewing and considering comments on the draft study, the Department will prepare and release a final version of the study.

408

DRAFT ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

409

Microsoft Word - INL_EXT-10-20208 DOE-Cooling Water Issues & Opportunities-Main Report-Rev.1.docx  

Broader source: Energy.gov (indexed) [DOE]

A Report to the U.S. Department of Energy A Report to the U.S. Department of Energy Office of Nuclear Energy December 2010 INL/EXT-10-20208 Revision 1 ii iii COOLING WATER ISSUES AND OPPORTUNITIES AT U.S. NUCLEAR POWER PLANTS A Report to the U.S. Department of Energy Office of Nuclear Energy Revision 1 December 2010 iv v PURPOSE This report has been prepared for the Department of Energy, Office of Light Water Reactor Technologies within DOE's Office of Nuclear Energy (DOE-NE), for the purpose of providing a status report on the challenges and opportunities facing the U.S. commercial nuclear energy industry in the area of plant cooling water supply. The report was prompted in part by recent Second Circuit and Supreme Court decisions regarding cooling water system designs at existing thermo-electric power generating facilities

410

DOE Reports Progress on Loan Guarantee Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reports Progress on Loan Guarantee Program Reports Progress on Loan Guarantee Program DOE Reports Progress on Loan Guarantee Program June 20, 2007 - 2:07pm Addthis Forms Credit Review Board, Names Temporary Staff, and Establishes Guidelines for Financial and Technical Reviews WASHINGTON, DC - The U.S Department of Energy (DOE) this week reported progress in implementing its Loan Guarantee program for promising projects that employ clean energy technologies, as authorized by the Energy Policy Act of 2005 (EPAct). DOE has established a Credit Review Board to make recommendations to the Secretary of Energy, named experts to work in the Loan Guarantee program office, and developed guidelines for the financial and technical review of loan guarantee applications. Additionally last month, DOE issued draft loan guarantee regulations that once final, will

411

Draft 2/17/11  

Broader source: Energy.gov (indexed) [DOE]

TO: File TO: File FROM: Thomas E. Magette SUBJECT: Meeting Notes re NOI for Convention on Supplementary Compensation ATTENDEES: Ben McRae, Anita Capoferri, and Sophia Angelini, DOE-GC; Sean Tyson, DOE-NE; Thomas E. Magette, EnergySolutions; and James Lieberman, Talisman International DATE: February 16, 2011 Mr. Magette summarized the EnergySolutions positions based on his letter of November 24, 2010. He emphasized the challenge DOE has to develop a rule to implement the statute and the Convention. DOE did not express any views on the issues and emphasized the need for commenters to provide specific information, such as on risk, to provide a basis for DOE action. The following issues were raised during the discussion: Need for further study and seeking an amendment of section 934 to delay rulemaking. DOE

412

TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY JACKSONVILLE, FL  

Broader source: Energy.gov (indexed) [DOE]

JACKSONVILLE, FL JACKSONVILLE, FL JANUARY 20, 1999 Mr. Kevin Blackwell (USDOT/FRA) updated the group on the status of the DOT response to DOE's inquiry about the tribal right to inspect rail shipments. The response was in the final stages of review in the General Counsel's office and is expected by July 1999. The Group has added a representative from the NRC General Counsel's office, as a topic group member, to help keep abreast of developments in the NRC's upcoming draft rulemaking regarding tribes and advanced notification. The group also discussed the research that has been conducted on the issue of developing a "umbrella grant" from DOE to states and tribes. Tribes concerns differ from State concerns because of disparities in available infrastructure to administer grants and funding equity issues.

413

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Broader source: Energy.gov (indexed) [DOE]

Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation Federal loan guarantee solicitation announcement -- Advanced Nuclear Energy Projects. Draft Advanced...

414

EIS-0391: DOE Notice of Availability of a Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0391: DOE Notice of Availability of a Final Environmental EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Richland, WA DOE announces the availability of its Final Tank Closure and Waste Management EIS for the Hanford Site, Richland, Washington (Final TC & WM EIS, DOE/EIS-0391), prepared pursuant NEPA. This Final EIS addresses all public comments on the Draft TC & WM EIS, which was issued in October 2009, and identifies DOE's preferred alternatives. EIS-0391-FEIS-DOENOA-2012.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-387 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012

415

US Nuclear Regulatory Commission Input to DOE Request for Information Smart  

Broader source: Energy.gov (indexed) [DOE]

US Nuclear Regulatory Commission Input to DOE Request for US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input More Documents & Publications Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Reply Comments of Entergy Services, Inc. Progress Energy draft regarding Smart Grid RFI: Addressing Policy and

416

EIS-0391: DOE Notice of Availability of a Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of a Final Environmental DOE Notice of Availability of a Final Environmental Impact Statement EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Richland, WA DOE announces the availability of its Final Tank Closure and Waste Management EIS for the Hanford Site, Richland, Washington (Final TC & WM EIS, DOE/EIS-0391), prepared pursuant NEPA. This Final EIS addresses all public comments on the Draft TC & WM EIS, which was issued in October 2009, and identifies DOE's preferred alternatives. EIS-0391-FEIS-DOENOA-2012.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-387 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012 EIS-0391: EPA Notice of Availability of a Final Environmental Impact

417

UK FT PDU Facility Draft EA  

Broader source: Energy.gov (indexed) [DOE]

2S 2S Draft Supplemental Environmental Assessment for University of Kentucky Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis Lexington, KY December 2013 Prepared for: Department of Energy National Energy Technology Laboratory This page intentionally left blank. Draft Supplemental Environmental Assessment DOE/EA-1642S Fischer-Tropsch Process Development Unit December 2013 Cover Sheet Proposed Action: The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with the University of Kentucky (UK) Center for Applied Energy Research (CAER), to partially fund the completion of the design, construction, and operation of a small-scale pilot plant for research related to the gasification of coal

418

To what extent does The Spectator accurately reflect the popular moral issues of the early eighteenth century  

E-Print Network [OSTI]

sometimes fro" Eustace Budgell and Thomas Tickell, but not Steels. Pu'olished three times a week, i began on June 1St 1714 and ended on December 20t 1714. I'or a discussion of eighteenth-century essayists, see George= S. I. arr, The Periodic-1 Essayists.... & This brief summary is sufficient to indicate the dif- "'*1t'a ti S * to . * edio''t fE t t*h monize public op'nion. . Mr. Spectator realized that he could not safely discuss political or rely gin?s issue? that would alienate his readers; he chose...

Barnes, Lethan Alan

1968-01-01T23:59:59.000Z

419

The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program  

E-Print Network [OSTI]

DRAFTING TECHNOLOGY The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program offers a choice of six areas of emphasis: architectural drafting; civil drafting; information technology; mechanical and electrical drafting; process

Ickert-Bond, Steffi

420

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...  

Office of Environmental Management (EM)

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation...

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

National Electric Transmission Congestion Study- Draft for Public Comment August 2014  

Broader source: Energy.gov [DOE]

On August 19, 2014, the Department issued a Federal Register Notice announcing the availability of a draft of its National Electric Transmission Congestion Study for public comment. The public comment period closed on October 20, 2014. The draft study is available for review and downloading.

422

EIS-0310: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

10: Draft Programmatic Environmental Impact Statement 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these responsibilities, DOE maintains nuclear infrastructure capabilities that support various missions. Current estimates for the future needs of medical and industrial isotopes, plutonium-238, and research requirements indicate that the current infrastructure may soon be insufficient to meet the projected demands. DOE proposes to enhance these

423

EA-1752: Draft Environmental Assessment | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

52: Draft Environmental Assessment 52: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

424

Draft Environmental Impact Statement for the Orlando Gasification Project  

Broader source: Energy.gov (indexed) [DOE]

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

425

EA-1860: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

426

EA-1752: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

752: Draft Environmental Assessment 752: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

427

EA-1860: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

428

EIS-0286: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide capabilities to continue, or modify, the way it treats, stores, and/or disposes of existing and anticipated quantities of solid LLW, MLLW, TRU waste, and ILAW at the Hanford Site in order to protect human health and the environment; facilitate cleanup at Hanford and other DOE facilities; take actions consistent with decisions reached by DOE under the WM PEIS; comply with local, State, and federal laws and regulations; and meet other obligations such as the Hanford Federal Facility Agreement and Consent Order (also referred to as the Tri-Party Agreement, or TPA) (Ecology et al. 1989).

429

EA-1862: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9/3/11 Submit comments to: Melissa Rossiter DOE Golden Field Office 1617 Cole Blvd Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce under the State Energy Program (SEP). Wisconsin selected an Oneida Seven Generations Corporation (Oneida) project to receive a $2 million loan under the SEP. The Bureau of Indian Affairs (BIA), an agency of the Department of the Interior (DOI), has already provided $584,000 in Federal funding to Oneida for this project. BIA is also considering providing a loan guarantee of up to $19 million. BIA made

430

Energia Sierra Juarez U.S. Transmission Line Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement Summary August 2010 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Department of Energy Washington, DC 20585 August 2010 Dear Sir/Madam: Enclosed for your review and comment is the Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0414), prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The County of San Diego, California, is a cooperating agency in the preparation of this Draft EIS.

431

EA-1599: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

599: Draft Environmental Assessment 599: Draft Environmental Assessment EA-1599: Draft Environmental Assessment Disposition of Radioactively Contaminated Nickel Located at the East Tennessee Technology Park, Oak Ridge, Tennessee, and the Paducah Gaseous Diffusion Plant, Paducah, Kentucky The U.S. Department of Energy (DOE or the Department) proposes the disposition (that is, sale, transfer, grant, or disposal) of approximately 15,300 tons (13,800 metric tons) of nickel metal scrap DOE has recovered from equipment it used in the uranium enrichment processes at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, Kentucky, and the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, where DOE currently stores the nickel. Environmental Assessment Disposition of Radioactively Contaminated Nickel

432

Drafts - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

O 452.2E Facility Safety Acquisition Career Management Program Nuclear Explosive and Weapon Surety Program Implementation Guide for Use in Developing Technical Safety...

433

eis kemper draft | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Response PDF-2.4MB Appendix G: Natural History and Taxonomic Reference for Price's Potato-Bean PDF-1.6MB Appendix H: Kemper County IGCC Project Wildlife Species Documented in...

434

DOE/NETL's R&D Response to Emerging Coal By-Product and Water Issues  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R&D Response to Emerging R&D Response to Emerging Coal By-Product and Water Issues Clean Coal and Power Conference in conjunction with 2 nd Joint U.S.-People's Republic of China Conference on Clean Energy Washington, DC November 17-19, 2003 Thomas J. Feeley, III National Energy Technology Laboratory Feeley_CC&P Conf. 11/03 Electric Power Using Coal Clean Liquid Fuels Natural Gas Coal Production Environmental Control V21 Next Generation Carbon Sequestration Exploration & Production Refining & Delivery Alternative Fuels Exploration & Production Pipelines & Storage Fuel Cells Combustion Turbines NETL Plays Key Role in Fossil Energy Supply, Delivery, and Use Technologies Future Fuels Photo of hydrogen fueled car: Warren Gretz, NREL Feeley_CC&P Conf. 11/03 Innovations for Existing Plants Program

435

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

6: EPA Notice of Availability of the Draft Environmental 6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

436

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

437

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

438

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

439

EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007 notice of intent for this SEIS, and 6.0 metric tons (6.6 tons) of surplus non-pit plutonium. The analyses also include options for pit disassembly and conversion of plutonium metal to oxide and the potential use of mixed oxide (MOX) fuel in reactors at the Sequoyah and Browns Ferry Nuclear Plants of the Tennessee

440

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions  

Broader source: Energy.gov (indexed) [DOE]

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution July 2, 2013 - 12:16pm Addthis What are the key facts? This solicitation will support projects that avoid, reduce, or sequester air pollutants or greenhouse gas emissions, an important part of the Administration's long-term plan towards a cleaner and more secure energy future. Applications for projects and facilities include any fossil technology that is new or significantly improved, as compared to commercial technologies in service in the U.S. The Department of Energy's (DOE) Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EA-1606: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

606: Draft Environmental Assessment 606: Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

442

Extension of Comment Period on the Draft Integrated, Interagency  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on the Draft Integrated, Interagency Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations September 25, 2013 - 4:24pm Addthis On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on

443

EIS-0355: EPA Notification of Availability of the Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

EPA Notification of Availability of the Draft EPA Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the

444

EIS-0488: FERC Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

88: FERC Draft Environmental Impact Statement 88: FERC Draft Environmental Impact Statement EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

445

EIS-0444: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

446

EIS-0382: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 606 megawatts of electricity (MWe) for export to the electrical grid, 1,212 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

447

EA-1606: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1606: Draft Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Meeting: Date: Thursday, September 15, 2011 Time: 6:00 p.m. Location: Amphitheater at Aiken Technical College 2276 Jefferson Davis Highway Graniteville, SC 29829 DOE has prepared a draft environmental assessment (EA) to analyze the potential environmental consequences of the proposed use of Savannah River Site (SRS) lands for military training. The purpose of the proposed action is to provide the military with greater

448

EIS-0336: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the proposed action and reasonable alternatives, including the "No Action" alternative. In addition, because the U.S. Forest Service, the Bureau of Land Management, and the U.S. International Boundary Water Commission (USIBWC) must act, and because their actions are

449

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions  

Broader source: Energy.gov (indexed) [DOE]

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution July 2, 2013 - 12:16pm Addthis What are the key facts? This solicitation will support projects that avoid, reduce, or sequester air pollutants or greenhouse gas emissions, an important part of the Administration's long-term plan towards a cleaner and more secure energy future. Applications for projects and facilities include any fossil technology that is new or significantly improved, as compared to commercial technologies in service in the U.S. The Department of Energy's (DOE) Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy

450

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

451

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

452

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Draft Environmental Impact Statement 8: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

453

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

454

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

455

Final Draft of RACER Audit  

SciTech Connect (OSTI)

This document describes the approach Waste and Environmental Services - Environmental Data and Analysis plans to take to resolve the issues presented in a recent audit of the WES-EDA Environmental Database relative to the RACER database. A majority of the issues discovered in the audit will be resolved in May 2011 when the WES-EDA Environmental Database, along with other LANL databases, are integrated and moved to a new vendor providing an Environmental Information Management (EIM) system that allows reporting capabilities for all users directly from the database. The EIM system will reside in a publicly accessible LANL cloud-based software system. When this transition occurs, the data quality, completeness, and access will change significantly. In the remainder of this document, this new structure will be referred to as the LANL Cloud System In general, our plan is to address the issues brought up in this audit in three ways: (1) Data quality issues such as units and detection status, which impinge upon data usability, will be resolved as soon possible so that data quality is maintained. (2) Issues requiring data cleanup, such as look up tables, legacy data, locations, codes, and significant data discrepancies, will be addressed as resources permit. (3) Issues associated with data feed problems will be eliminated by the LANL Cloud System, because there will be no data feed. As discussed in the paragraph above, in the future the data will reside in a publicly accessible system. Note that report writers may choose to convert, adapt, or simplify the information they receive officially through our data base, thereby introducing data discrepancies between the data base and the public report. It is not always possible to incorporate and/or correct these errors when they occur. Issues in the audit will be discussed in the order in which they are presented in the audit report. Clarifications will also be noted as the audit report was a draft document, at the time of this response.

Paige, Karen Schultz [Los Alamos National Laboratory; Gomez, Penelope E. [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

456

EIS-0373: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

73: EPA Notice of Availability of the Draft Environmental 73: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0373: EPA Notice of Availability of the Draft Environmental Impact Statement Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems DOE/EIS-0373, EPA Notice of Availability of the Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear Operations Related to Production of Radioisotope Related to Production of Radioisotope Power Systems, 70 FR 38132 (July 2005) More Documents & Publications EIS-0374: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact

457

EIS-0359: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0359: EPA Notice of Availability of the Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site DOE/EIS-0359, Environmental Protection Agency, Notice of Availability, Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky Site, 68 FR 66825 (November 2003) More Documents & Publications EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact

458

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft Environmental Impact

459

EIS-0284: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois DOE/EIS-0284, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois, 69 FR 10442 (March 2004) More Documents & Publications EIS-0348: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0397: EPA Notice of Availability of the Draft Environmental Impact

460

EIS-0444: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

444: EPA Notice of Availability of the Draft Environmental 444: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0444: EPA Notice of Availability of the Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of Availability - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals Production Plant, Odessa, Ector County, Texas, DOE/EIS-0444 (March 2011 - 76 FR 14968) More Documents & Publications EIS-0403: EPA Amended Notice of Availability of the Draft Programmatic Environmental Impact Statement (Extension of Public Comment Period) EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Secretarial Review Draft Environmental Assessment/  

E-Print Network [OSTI]

Secretarial Review Draft Environmental Assessment/ Regulatory Impact Review/Initial Regulatory review draft Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis Flexibility Analysis For the Arctic Fishery Management Plan And Amendment 29 to the Fishery Management Plan

462

EA-1906: Draft Environmental Assessment  

Broader source: Energy.gov [DOE]

Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

463

EA-1861: DOE Notice of Availability of the Finding of No Significant Impact  

Broader source: Energy.gov (indexed) [DOE]

1: DOE Notice of Availability of the Finding of No 1: DOE Notice of Availability of the Finding of No Significant Impact EA-1861: DOE Notice of Availability of the Finding of No Significant Impact Frito Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) has issued a Finding of No Significant Impact (FONSI) based on completion of an Environmental Assessment (EA) to describe and evaluate the potential environmental impacts associated with the Frito Lay Biomass Boiler Project. Notice of Availability of a Finding of No Significant Impact (FONSI) concerning the Frito Lay Biomass Boiler Project, Beloit, Wisconsin, DOE/EA-1861 (July 2011) More Documents & Publications EA-1861: Draft Environmental Assessment EA-1861: Final Environmental Assessment EA-1658: Finding of No Significant Impact

464

Energy Sector Cybersecurity Framework Implementation Guidance- Draft for Public Comment & Comment Submission Form (September 2014)  

Broader source: Energy.gov [DOE]

On September 12, 2014, the Department issued a Federal Register Notice announcing the availability of the Energy Sector Cybersecurity Framework Implementation Guidance for public comment. The draft Energy Sector Cybersecurity Framework Implementation Guidance and comment submission form are available.

465

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

07: EPA Notice of Availability of the Draft Environmental 07: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement

466

EIS-0380: Notice to Extend Comment Period on the Draft Site-Wide  

Broader source: Energy.gov (indexed) [DOE]

to Extend Comment Period on the Draft Site-Wide to Extend Comment Period on the Draft Site-Wide Environmental Impact Statement EIS-0380: Notice to Extend Comment Period on the Draft Site-Wide Environmental Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico In response to requests for additional time to review and comment on the document, NNSA is extending the public comment period until September 20, 2006. DOE/EIS-0380, Department of Energy, National Nuclear Security Administration, Extension of Comment Period on the Draft Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico, 76 FR 40352 (August 2006) More Documents & Publications EIS-0380: DOE Notice of Availability of the Draft Site-Wide Environmental

467

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Final Environmental Impact

468

EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental  

Broader source: Energy.gov (indexed) [DOE]

3-S1: Notice of Availability of a Draft Supplemental 3-S1: Notice of Availability of a Draft Supplemental Environmental Assessment (DOE/EA-1887) EA-1573-S1: Notice of Availability of a Draft Supplemental Environmental Assessment (DOE/EA-1887) Proposed Renewable Fule Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO DOE's Golden Field Office has prepared a draft Supplemental Environmental Assessment (SEA) for improvments to the Renewable Fuel Heat Plant (RFHP) NREL South Table Mountain site. The SEA and the RFHP EA are now available for public review. See DOE/EA-1573-S1. EA-1573D-S1-NOA-2012_0.pdf More Documents & Publications EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO

469

TWC Committee: Draft Advice re: Double-Shell Tank AY-102, v.4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Larsen Page 1 of 2 Draft Advice re: Double-Shell Tank AY-102 and Leaking Single-Shell Tanks Background: The U.S. Department of Energy - Office of River Protection (DOE-ORP)...

470

H-Prize Draft Guideline Comments Deadline Extended to Monday, April 28  

Broader source: Energy.gov [DOE]

The deadline for comments on the H-Prize draft guidelines has been extended to Monday, April 28. Send any feedback or suggestions on how we can improve the competition to hprize@go.doe.gov.

471

EIS-0360: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0360: Draft Environmental Impact Statement Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site The U.S. Department of Energy (DOE) proposes, via a contract awarded at the direction of Congress (Public Law 107-206), to design, construct, and operate two conversion facilities for converting depleted uranium hexafluoride (commonly referred to as DUF6): one at Portsmouth, Ohio, and one at Paducah, Kentucky. DOE intends to use the proposed facilities to convert its inventory of DUF6 to a more stable chemical form suitable for beneficial use or disposal. This site-specific EIS analyzes the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed DUF6 conversion facility at three

472

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

473

EA-1829: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 3610 Morgantown, WV 26507-0880 Electronic mail: Jesse.Garcia@netl.doe.gov The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost

474

EIS-0473: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial assistance to NRG under the Clean Coal Power Initiative (CCPI) Program to support construction and operation of NRG's Parish PCCS Project . EIS-0473-DEIS-Summary-2012.pdf EIS-0473-DEIS-VolumeI-2012.pdf EIS-0473-DEIS-VolumeII-AppendicesA-B-2012.pdf EIS-0473-DEIS-VolumeII-AppendixC-Part1-2012.pdf

475

EA-1812: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado For more information, contact: Ms. Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, Colorado 80401 Electronic mail: melissa.rossiter@go.doe.gov DOE is proposing to authorize the expenditure of Federal funding through the Community Renewable Energy Deployment Program to Phillips County for design, permitting, and construction of an approximately 30-megawatt wind energy project, known as Haxtun Wind Project, within Phillips and Logan counties in northeastern Colorado. The proposed project consists of 18 wind turbines that would interconnect to the Highline Electric Cooperative equipment inside Western Area Power Administration's Haxtun substation just

476

EA-1851: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1851: Draft Environmental Assessment Delphi Automotive Systems, LLC, Electric Drive Vehicle Battery and Component Manufacturing Initiative For more information, contact: Ms. Pierina Fayish U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, MS: 922-M217 Pittsburgh, PA 15236 Fax: 412-386-4775 Electronic mail: pierina.fayish@netl.doe.gov DOE prepared this EA to evaluate the potential environmental consequences of providing a financial assistance grant under the American Recovery andReinvestment Act of 2009 (ARRA) to Delphi Automotive Systems, Limited Liability Corporation (LLC) (Delphi). Delphi proposes to construct a laboratoryreferred to as the "Delphi Kokomo, IN Corporate Technology Center" (Delphi CTC Project) and retrofit a manufacturing facility. The

477

EIS-0407: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0407: Draft Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide approximately $85 million of the total anticipated cost of approximately $300 million (2008 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity) sufficient to meet the needs of

478

EA-1800: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1800: Draft Environmental Assessment Monarch Warren County Wind Turbine Project, Lenox Township, Warren County, Illinois The U.S. Department of Energy (DOE) has provided Federal funding to the Illinois Department of Commerce and Economic Opportunity (DCEO) under the State Energy Program (SEP). DCEO is seeking to provide $5 million of its SEP funds to Monarch Wind Power (MWP), who would use these funds for the design, permitting and construction of 12, 1.6- megawatt wind turbines, for a combined generation capacity of 19.2 megawatts. This EA provides DOE and other decisionmakers the information needed to make an informed decision about the installation, operation, and eventual decommissioning of the proposed wind project. The EA evaluates the potential individual and

479

EA-1823: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1823: Draft Environmental Assessment Rockford Solar Energy Project, Chicago-Rockford Airport, Winnebago County, Illinois For more information contact: Mr. John Jediny, NEPA Document Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Telephone: 202-287-5380 Fax: 202-340-9260 Electronic mail: John.Jediny@ee.doe.gov Public Hearing: Date: Monday, October 24, 2011; Time: 4 p.m. to 7 p.m. Location: Auditorium at the Offices of the Greater Rockford Airport Authority, 60 Airport Drive, Rockford, Illinois, 61109 DOE's proposed action would authorize Federal funding to the Illinois Department of Commerce and Economic Opportunity under the State Energy Program.

480

EA-1885: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1885: Draft Environmental Assessment Boston Architectural College's (BAC) Urban Sustainability Initiative for the Renovation of Public Alley #444, Boston, MA (December 2011) DOE prepared this EA to evaluate the potential environmental consequences of providing a $1.6 million grant to Boston Architectural College (BAC) for its Urban Sustainability Initiative for the Renovation of Public Alley #444. The financial assistance proposed would be in the form of cost-shared funding, based on a FY2010 congressional earmark. This EA analyzes the potential environmental impacts of DOE's proposed action of providing the grant funding and of the No-Action Alternative. EA-1885-DEA-2011.pdf EA-1885-DearReaderLetter-2011.pdf More Documents & Publications

Note: This page contains sample records for the topic "doe issues draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1793: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Draft Environmental Assessment 3: Draft Environmental Assessment EA-1793: Draft Environmental Assessment Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site The U.S. Department of Energy (DOE) proposes to provide replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Historically, INL has disposed of this LLW onsite. However, the existing disposal area located within the INL Radioactive Waste Management Complex will undergo closure as part of ongoing cleanup of INL and will not be available after 2017. The proposed project to establish replacement capability is not a DOE Environmental Management Idaho Cleanup Project

482

Draft Nevada National Security Site Environmental Impact Statement Released  

Broader source: Energy.gov (indexed) [DOE]

Nevada National Security Site Environmental Impact Statement Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada is available for public review and comment through October 27, 2011. Within the draft SWEIS, the U.S. Department of Energy, National Security Administration Nevada Site Office presents a formal analysis of how current and potential missions at the NNSS (formerly the Nevada Test Site) and related off-site locations may affect the environment over the next ten

483

Chief Joseph Hatchery Program, Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Chief Joseph Hatchery Program Chief Joseph Hatchery Program Draft Environmental Impact Statement DOE/EIS-0384 May 2007 Chief Joseph Hatchery Program Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Project: Chief Joseph Hatchery Program Cooperating Tribe: Confederated Tribes of the Colville Reservation State Involved: Washington Abstract: The Draft Environmental Impact Statement (DEIS) describes a Chinook salmon hatchery production program sponsored by the Confederated Tribes of the Colville Reservation (Colville Tribes). BPA proposes to fund the construction, operation and maintenance of the program to help mitigate for anadromous fish affected by the Federal Columbia River Power System dams on the Columbia River. The Colville Tribes want to produce adequate

484

Microsoft Word - 2011_07_05_KHP Draft EIS.doc  

Broader source: Energy.gov (indexed) [DOE]

N N Klickitat Hatchery Complex Program Draft Environmental Impact Statement July 2011 DOE/EA-0424 Klickitat Hatchery Complex Program Draft Environmental Impact Statement DOE/EIS-0424 Bonneville Power Administration National Marine Fisheries Service Bureau of Indian Affairs Washington Department of Fish and Wildlife Confederated Tribes and Bands of the Yakama Nation July 2011 Abstract - Klickitat Hatchery Complex Program Draft Environmental Impact Statement Responsible Agencies: Lead federal agency: U.S. Department of Energy, Bonneville Power Administration (BPA); cooperating federal agencies: National Marine Fisheries Service, Bureau of Indian Affairs; Lead state agency: Washington Department of Fish and Wildlife (WDFW); cooperating tribe: Confederated Tribes and Bands of the Yakama Nation

485

DRAFT/PRELIMINARY MEETING AGENDA  

Broader source: Energy.gov (indexed) [DOE]

AGENDA AGENDA U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP NEW ORLEANS, LOUISIANA JANUARY 29-30, 2002 Judith Holm, TEC Co-Chair, DOE-NTP Monday, January 28, 2002 4:00 - 6:00 p.m. Consolidated Grant Topic Group Meeting Judith Holm, DOE-National Transportation Program Tuesday, January 29, 2002 8:00 - 8:30 a.m. Continental Breakfast and General Registration Sue Martindale, Mary McConnell, SAIC 8:30 -12:00 p.m. Topic Group Meetings - Training and Medical Issues - Ella McNeil, DOE-Office of Transportation - Tribal - Judith Holm, DOE-National Transportation Program - Rail - Steve Hamp, DOE-National Transportation Program 10:00- 10:30 a.m. Break 12:00 - 1:30 p.m. Lunch Break (on your own) 1:30 -1:45 p.m. Welcome and State of the Program

486

MCELROY REPORT; ROUGH DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Combining a New 3-D Seismic S-Wave Propagation Analysis Combining a New 3-D Seismic S-Wave Propagation Analysis for Remote Fracture Detection with a Robust Subsurface Microfracture-Based Verification Technique FINAL REPORT June 6, 2000-December 31, 2003 Principal Authors: Bob Hardage, M. M. Backus, M. V. DeAngelo, R. J. Graebner, S. E. Laubach, and Paul Murray Report Issue Date: February 2004 DOE Contract No. DE-AC26-00NT40690 Submitting Organization: Bureau of Economic Geology The University of Texas at Austin University Station, Box X Austin, TX 78713-8924 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal

487

"FutureGen 2.0 Project Draft Environmental Impact Statement Summary"  

Broader source: Energy.gov (indexed) [DOE]

SHEET SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

488

DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments  

Broader source: Energy.gov (indexed) [DOE]

- Responses to Draft Specification Comments 1 - Responses to Draft Specification Comments 1 Updated 4/9/2012 DOE Responses to DOE Challenge Home (formerly Builders Challenge) National Program Requirements Public Comments DOE received comments on the draft DOE Challenge Home specifications and requirements from December 15, 2011 through January 31, 2012. This document summarizes the comments received, DOE's responses, and the resulting policy change, if any. All comments were reviewed. Similar comments were grouped together in the responses. Editorial comments and general observations were considered, but are not listed in the responses below unless they involved a significant clarification to the DOE Challenge Home provisions. DOE is not responsible for any typographical errors or omissions.

489

Nevada Site Office Invites Public to Participate in Draft Nevada National  

Broader source: Energy.gov (indexed) [DOE]

Site Office Invites Public to Participate in Draft Nevada Site Office Invites Public to Participate in Draft Nevada National Security Site Environmental Impact Statement Hearings Nevada Site Office Invites Public to Participate in Draft Nevada National Security Site Environmental Impact Statement Hearings September 13, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is holding a series of public hearings in September 2011 to discuss the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. These meetings are part of an official public comment period that spans from July 29 through October 27, 2011.

490

MHK LCOE Reporting Guidance Draft | OpenEI Community  

Open Energy Info (EERE)

MHK LCOE Reporting Guidance Draft MHK LCOE Reporting Guidance Draft Home > Groups > Water Power Forum Ocop's picture Submitted by Ocop(5) Member 18 April, 2013 - 13:41 Cost Current DOE LCOE numerical modeling Performance Tidal Wave To normalize competing claims of LCOE, DOE has developed-for its own use-a standardized cost and performance data reporting process to facilitate uniform calculation of LCOE from MHK device developers. This standardization framework is only the first version in what is anticipated to be an iterative process that involves industry and the broader DOE stakeholder community. Multiple files are attached here for review and comment. The primary files for review are the: "DOE LCOE Reporting Guidance" Word document an Excel workbook containing the reference resource data for Wave

491

Microsoft Word - Final DRAFT EA BAC 7 Dec 2011  

Broader source: Energy.gov (indexed) [DOE]

BOSTON ARCHITECTURAL COLLEGE'S (BAC) BOSTON ARCHITECTURAL COLLEGE'S (BAC) URBAN SUSTAINABILITY INITIATIVE FOR THE RENOVATION OF PUBLIC ALLEY #444, BOSTON, MASSACHUSETTS U.S. Department of Energy National Energy Technology Laboratory DECEMBER 2011 DOE/EA-1885D DRAFT ENVIRONMENTAL ASSESSMENT FOR THE BOSTON ARCHITECTURAL COLLEGE'S (BAC) URBAN SUSTAINABILITY INITIATIVE FOR THE RENOVATION OF PUBLIC ALLEY #444, BOSTON, MASSACHUSETTS U.S. Department of Energy National Energy Technology Laboratory DECEMBER 2011 DOE/EA-1885D DOE/EA-1885D iii December 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Draft Environmental Assessment for the Boston Architectural College's (BAC) Urban Sustainability Initiative for the Renovation of Public Alley #444, Boston, Massachusetts

492

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final  

Broader source: Energy.gov (indexed) [DOE]

DOE/EIS-0236, Oakland Operations Office, National Ignition Facility DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE/EIS-0236, Oakland Operations Office, National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement Volume II: Response to Public Comments (January 2 DOE issued the Draft SEIS for public review and comment by mailings to stakeholders and by announcements in the Federal Register (FR) on November 5, 1999, (64 FR 60430) (Attachment 4 of Volume I) and on November 12, 1999 (64 FR 61635) correcting a document title (Attachment 5 of Volume I). On