Sandia/DOE geothermal drilling and completion technology development program  

DOE Green Energy (OSTI)

The high cost of drilling and completing geothermal wells is an impediment to the development of geothermal energy resources. Technological deficiencies in rotary drilling techniques are evidenced when drilling geothermal wells. The Division of Geothermal Energy (DGE) of the US Department of Energy (DOE) has initiated a program aimed at developing new drilling and completion techniques for geothermal wells. The goals of this program are to reduce well costs 25% by 1982 and 50% by 1986. Sandia Laboratories has managed this technology development program since October 1977, and this paper presents an overview of the program. A statement of program goals and structure is given. The content of the FY-79 program is presented and recent results of R and D projects are given. Plans for development of an advanced drilling and completion system are discussed.

Barnette, J.H.

1979-01-01T23:59:59.000Z

2

Geothermal Program Review VII: proceedings. DOE Research and Development for the Geothermal Marketplace  

DOE Green Energy (OSTI)

Each year the Geothermal Technology Division of the US Department of Energy conducts an indepth review of its entire geothermal R and D program. The 2--3 day conference serves several purposes: a status report on current R and D activities, an assessment of progress and problems, a review of management issues, and a technology transfer opportunity between DOE and the US geothermal industry. This year's conference, Program Review 7, was held in San Francisco on March 21--23, 1989. As indicated by its title, ''DOE Research and Development for the Geothermal Marketplace'', Program Review 7 emphasized developing technologies, concepts, and innovations having potential for commercial application in the foreseeable future. Program Review 7 was comprised of eight sessions including an opening session and a special presentation on the ''Role of Geothermal Energy in Minimizing Global Environmental Problems.'' The five technical sessions covered GTD-sponsored R and D in the areas of hydrothermal (two sessions), hot dry rock, geopressured, and magma. Presentations were made by the relevant field researchers, and sessions were chaired by the appropriate DOE Operations Office Geothermal Program Manager. The technical papers and commentary of invited speakers contained in these Proceedings have been compiled in the order in which they were presented at Program Review 7.

Not Available

1989-01-01T23:59:59.000Z

3

Geothermal Today: 2005 Geothermal Technologies Program Highlights  

DOE Green Energy (OSTI)

This DOE/EERE Geothermal Technologies Program publication highlights accomplishments and activities of the program during the last two years.

Not Available

2005-09-01T23:59:59.000Z

4

Program in geothermal well technology directed toward achieving DOE/DGE power-on-line goals  

DOE Green Energy (OSTI)

This document presents the material used in an oral presentation to the DOE/Division of Geothermal Energy, which was designed to illustrate the importance of well technology development in reducing geothermal well costs, and to achieve geothermal power-on-line goals. Examination of recent studies of the economics of geothermal energy leads to the conclusion that the overall sensitivity of geothermal power-on-line to well cost is in the range of one to two. Current data suggest that a vigorous R and D program in rotary drilling technology can reduce geothermal drilling costs by about 20%, but a reduction of 40 to 50% is needed to achieve DOE/DGE goals. Research in advanced drilling systems is needed to satisfy this more stringent requirement. Some critical technological deficiencies that occur when current rotary drilling techniques are used for geothermal drilling are discussed. A broadly based development program directed at correcting these deficiencies is defined.

Polito, J.; Varnado, S.G.

1978-10-01T23:59:59.000Z

5

Geothermal Technologies Program: Washington  

DOE Green Energy (OSTI)

This fact sheets provides a summary of geothermal potential, issues, and current development in Washington State. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

Not Available

2005-02-01T23:59:59.000Z

6

Geothermal Technologies Program: Alaska  

DOE Green Energy (OSTI)

This fact sheets provides a summary of geothermal potential, issues, and current development in Alaska. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

Not Available

2005-02-01T23:59:59.000Z

7

Geothermal Technologies Program: Oregon  

DOE Green Energy (OSTI)

This fact sheets provides a summary of geothermal potential, issues, and current development in Oregon. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

Not Available

2005-02-01T23:59:59.000Z

8

Geothermal Chemical Modeling Project DOE Advanced Brine Chemistry Program  

DOE Green Energy (OSTI)

The brine-calcite-anhydrite-silica scale model program is ready to be used by the industry at a research level. Versions are already in use in studies of scaling in geothermal and oil production systems. A set of short course notes has been prepared to help perspective users. IBM and Macintosh versions of the model are available. The gas phase models have been incorporated in the general package for distribution. Both mainframe (SUN) and PC versions (MacIntosh and IBM) of the code have been distributed.

Moeller, N.; Weare, J.H.

1993-04-01T23:59:59.000Z

9

How CEQA has streamlined the NEPA process for the DOE Geothermal Loan Guaranty Program  

DOE Green Energy (OSTI)

Geothermal loan guaranties have been granted for nine projects located in the western United States, most of them in California where certain state and/or local agency actions are subject to environmental review under the California Environmental Quality Act (CEQA) of 1970. Similarly, the federal action of granting a geothermal loan guaranty must be reviewed pursuant to the National Environmental Policy Act (NEPA) of 1969 to determine its impacts to the quality of the human environment. This paper traces the evolution of the relationship between the CEQA and NEPA environmental review processes, and focuses on the manner in which CEQA has streamlined the NEPA review for the DOE geothermal loan guaranty program. Two recently-prepared DOE environmental assessments are highlighted to describe the incorporation of CEQA analyses and documents into NEPA documents. 7 refs., 1 tab.

Reed, A.W.

1985-01-01T23:59:59.000Z

10

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis  

DOE Green Energy (OSTI)

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

Young, K. R.; Augustine, C.; Anderson, A.

2010-02-01T23:59:59.000Z

11

Geothermal Technologies Program: Enhanced Geothermal Systems  

DOE Green Energy (OSTI)

This general publication describes enhanced geothermal systems (EGS) and the principles of operation. It also describes the DOE program R&D efforts in this area, and summarizes several projects using EGS technology.

Not Available

2004-08-01T23:59:59.000Z

12

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis: Preprint  

NLE Websites -- All DOE Office Websites (Extended Search)

388 388 February 2010 Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis Katherine R. Young and Chad Augustine National Renewable Energy Laboratory Arlene Anderson U.S. Department of Energy Presented at Stanford Geothermal Workshop Stanford, California February 1, 2010 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (ASE), a contractor of the US Government under Contract No. DE-AC36-08-GO28308. Accordingly, the US Government and ASE retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

13

Geothermal Energy Program overview  

SciTech Connect

The mission of the Geothermal Energy Program is to develop the science and technology necessary for tapping our nation's tremendous heat energy sources contained with the Earth. Geothermal energy is a domestic energy source that can produce clean, reliable, cost- effective heat and electricity for our nation's energy needs. Geothermal energy -- the heat of the Earth -- is one of our nation's most abundant energy resources. In fact, geothermal energy represents nearly 40% of the total US energy resource base and already provides an important contribution to our nation's energy needs. Geothermal energy systems can provide clean, reliable, cost-effective energy for our nation's industries, businesses, and homes in the form of heat and electricity. The US Department of Energy's (DOE) Geothermal Energy Program sponsors research aimed at developing the science and technology necessary for utilizing this resource more fully. Geothermal energy originates from the Earth's interior. The hottest fluids and rocks at accessible depths are associated with recent volcanic activity in the western states. In some places, heat comes to the surface as natural hot water or steam, which have been used since prehistoric times for cooking and bathing. Today, wells convey the heat from deep in the Earth to electric generators, factories, farms, and homes. The competitiveness of power generation with lower quality hydrothermal fluids, geopressured brines, hot dry rock, and magma ( the four types of geothermal energy) still depends on the technical advancements sought by DOE's Geothermal Energy Program.

1991-12-01T23:59:59.000Z

14

Idaho Geothermal Commercialization Program. Idaho geothermal handbook  

DOE Green Energy (OSTI)

The following topics are covered: geothermal resources in Idaho, market assessment, community needs assessment, geothermal leasing procedures for private lands, Idaho state geothermal leasing procedures - state lands, federal geothermal leasing procedures - federal lands, environmental and regulatory processes, local government regulations, geothermal exploration, geothermal drilling, government funding, private funding, state and federal government assistance programs, and geothermal legislation. (MHR)

Hammer, G.D.; Esposito, L.; Montgomery, M.

1980-03-01T23:59:59.000Z

15

Geothermal Today: 2003 Geothermal Technologies Program Highlights (Revised)  

DOE Green Energy (OSTI)

This outreach publication highlights milestones and accomplishments of the DOE Geothermal Technologies Program for 2003. Included in this publication are discussions of geothermal fundamentals, enhanced geothermal systems, direct-use applications, geothermal potential in Idaho, coating technology, energy conversion R&D, and the GeoPowering the West initiative.

Not Available

2004-05-01T23:59:59.000Z

16

Geothermal Program Review IV: proceedings  

DOE Green Energy (OSTI)

The research and development program of DOE's Geothermal Technology Division is reviewed in separate presentations according to program area. Separate abstracts have been prepared for the individual papers. (ACR)

Not Available

1985-01-01T23:59:59.000Z

17

Geothermal Technologies Program: Utah  

DOE Green Energy (OSTI)

Geothermal Technologies Program Utah fact sheet describes the geothermal areas and use in Utah, focusing on power generation as well as direct use, including geothermally heated greenhouses, swimming pools, and therapeutic baths.

Not Available

2005-06-01T23:59:59.000Z

18

Cascades geothermal program  

SciTech Connect

The Cascades region is an area with high geothermal potential but few surface manifestations and limited subsurface data. To stimulate further development of hydrothermal resources, DOE-Idaho Operations Office issued Solicitation Number DE-SC07-85IDI2580. The reason for this solicitation was to secure cost sharing agreements with industry to drill gradient holes that would penetrate the rain curtain and obtain deep thermal, lithologic, and structural data. The data obtained and studies conducted under this program are to be released to the public for the benefit of the geothermal industry and the scientific community. The first thermal gradient hole to be drilled under this program was finished November 1985 by GEO-Newberry Crater, Inc. on the south flank of Newberry volcano. Data for additional wells drilled under the Cascades Geothermal Drilling Program will be released as they become available.

Not Available

1986-01-01T23:59:59.000Z

19

GEOTHERMAL ENERGY PROGRAM - Home - Energy Innovation Portal  

28 geothermal energy program allan jelacic program manager allan.jelacic@ee.doe.gov (202) 586-6054 venture capital technology showcase aug 21 and 22, 2007

20

Geothermal Technologies Program: Direct Use  

DOE Green Energy (OSTI)

This general publication describes geothermal direct use systems, and how they have been effectively used throughout the country. It also describes the DOE program R&D efforts in this area, and summarizes several projects using direct use technology.

Not Available

2004-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Geothermal energy program summary  

DOE Green Energy (OSTI)

The Geothermal Technology Division (GTD) of the US Department of Energy (DOE) is charged with the lead federal role in the research and development (R D) of technologies that will assist industry in economically exploiting the nation's vast geothermal resources. The GTD R D Program represents a comprehensive, balanced approach to establishing all forms of geothermal energy as significant contributors to the nation's energy supply. It is structured both to maintain momentum in the growth of the existing hydrothermal industry and to develop long-term options offering the greatest promise for practical applications. This volume, Volume 2, contains a detailed compilation of each GTD-funded R D activity performed by national laboratories or under contract to industrial, academic, and nonprofit research institutions.

Not Available

1990-01-01T23:59:59.000Z

22

Geothermal energy program summary  

SciTech Connect

The Geothermal Technology Division (GTD) of the US Department of Energy (DOE) is charged with the lead federal role in the research and development (R D) of technologies that will assist industry in economically exploiting the nation's vast geothermal resources. The GTD R D Program represents a comprehensive, balanced approach to establishing all forms of geothermal energy as significant contributors to the nation's energy supply. It is structured both to maintain momentum in the growth of the existing hydrothermal industry and to develop long-term options offering the greatest promise for practical applications. This volume, Volume 2, contains a detailed compilation of each GTD-funded R D activity performed by national laboratories or under contract to industrial, academic, and nonprofit research institutions.

1990-01-01T23:59:59.000Z

23

Geothermal Energy R&D Program Summary  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form.

1988-11-18T23:59:59.000Z

24

Geothermal Well Technology Program  

DOE Green Energy (OSTI)

The high cost of drilling and completing geothermal wells is an impediment to the development of geothermal energy resources. Technological deficiencies in rotary drilling techniques are evidenced when drilling geothermal wells. The Division of Geothermal Energy (DGE) of the U.S. Department of Energy has initiated a program aimed at developing new drilling and completion techniques for geothermal wells. The goals of this program are to reduce well costs by 25% by 1982 and by 50% by 1986. An overview of the program is presented. Program justification which relates well cost to busbar energy cost and to DGE power-on-line goals is presented. Technological deficiencies encountered when current rotary drilling techniques are used for geothermal wells are discussed. A program for correcting these deficiencies is described.

Varnado, S.G.

1978-01-01T23:59:59.000Z

25

Geothermal Loan Guaranty Program  

DOE Green Energy (OSTI)

Presently the US imports a large proportion of its petroleum requirements. This dependence on foreign petroleum has had a major impact on our economy. As a result, the Federal government is sponsoring programs to offset this foreign reliance by conservation of oil and gas, conversion of petroleum using facilities to coal and nuclear energy and the development of alternate sources of energy. One of the most acceptable alternate resources is geothermal. It offers an environmentally sound energy resource, can be developed at reasonable cost in comparison to other forms of energy and has a long term production capacity. On September 3, 1974, the Geothermal Energy Research Development and Demonstration Act was enacted to further the research, development and demonstration of geothermal energy technologies. This Act also established the Geothermal Loan Guaranty Program to assist in the financing of geothermal resource development, both electrical and non-electrical. The highlights of that Guaranty Program are detailed in this report.

None

1977-11-17T23:59:59.000Z

26

Hawaii's geothermal program  

Science Conference Proceedings (OSTI)

Opposition to Hawaii's geothermal program, which is coming not only from the usual citizens' and environmental groups, but also from worshippers of a native god and, it has been alleged, growers of marijuana, is discussed. The clash occurs just as geothermal ...

G. Zorpette

1992-02-01T23:59:59.000Z

27

DOE - Office of Legacy Management -- Geothermal  

NLE Websites -- All DOE Office Websites (Extended Search)

Geothermal Test Facility, California A Oakland Operations Office site geothermalmap The Geothermal Test Facility site was a research laboratory formerly operated under the DOE...

28

Geothermal: Sponsored by OSTI -- Geothermal pump program  

Office of Scientific and Technical Information (OSTI)

pump program Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications Advanced Search New Hot Docs News...

29

DOE geothermal R&D program focused on facilitating long-term, cost-effective private resource development  

SciTech Connect

Analyses conducted in support of the National Energy Strategy projected that as much as 22,000 megawatts of cost-effective, moderate-temperature geothermal energy are available to the U.S. over the long-term, or to the year 2030. Thus, the primary hydrothermal technology research goal of the Department's Geothermal Division is to facilitate the ability of the private sector to exploit competitively this large source of energy up to that capacity level or greater. The primary mechanism for implementing this goal is an R&D core program cost-shared with industry focused on major cost-sensitive technology areas: exploration technology, reservoir engineering and management, and drilling. The NES analyses also indicated that electricity generated with energy derived from hot dry rock could be a geographically dispersed, logical follow-on to hydrothermal electricity in the longer term. In order to demonstrate whether energy at useful temperatures can be extracted over extended periods at competitive energy prices, a long-term flow test of an experimental HDR system will be conducted. This paper describes DOE's current participation in R&D activities leading to the development of ''cutting edge'' technology that will serve the geothermal industry's interest well into the next century.

Mock, John E.

1992-01-01T23:59:59.000Z

30

The LBL geothermal reservoir technology program  

DOE Green Energy (OSTI)

The main objective of the DOE/GD-funded Geothermal Reservoir Technology Program at Lawrence Berkeley Laboratory is the development and testing of new and improved methods and tools needed by industry in its effort to delineate, characterize, evaluate, and exploit hydrothermal systems for geothermal energy. This paper summarizes the recent and ongoing field, laboratory, and theoretical research activities being conducted as part of the Geothermal Reservoir Technology Program. 28 refs., 4 figs.

Lippmann, M.J.

1991-03-01T23:59:59.000Z

31

DOE 2009 Geothermal Risk Analysis: Methodology and Results (Presentation)  

NLE Websites -- All DOE Office Websites (Extended Search)

2009 DOE GEOTHERMAL RISK ANALYSIS: Prepared by the National Renewable Energy Laboratory (NREL) 2009 DOE GEOTHERMAL RISK ANALYSIS: Prepared by the National Renewable Energy Laboratory (NREL) eere.energy.gov The Parker Ranch installation in Hawaii DOE 2009 Geothermal Risk Analysis: Methodology and Results DOE Geothermal Technologies Program arlene.anderson@ee.doe.gov February 1, 2010 Geothermal Technologies Program (GTP) Arlene Anderson & Chad Augustine NREL Strategic Energy Analysis Center Chad.Augustine@nrel.gov Katherine R. Young (NREL) Chad Augustine (NREL) Arlene Anderson (DOE-2046GTP) NREL/PR-6A2-47526 Presented at the Stanford Geothermal Workshop, 1-3 February 2010, Stanford, California Jim McVeigh (Sentech), Ed Eugeni, (Sentech), Joe Cohen (SAIC) Pacific Gas & Electric/PIX 00059 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by

32

Federal Geothermal Research Program Update - Fiscal Year 2001  

DOE Green Energy (OSTI)

This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

Laney, P.T.

2002-08-31T23:59:59.000Z

33

Geothermal Today: 2003 Geothermal Technologies Program Highlights (Covers Highlights from 2002)  

DOE Green Energy (OSTI)

This outreach publication highlights milestones and accomplishments of the DOE Geothermal Technologies Program for 2002. Included in this publication are discussions of geothermal fundamentals, enhanced geothermal systems, direct-use applications, geothermal potential in Idaho, coating technology, energy conversion R&D, and the GeoPowering the West initiative.

Not Available

2003-09-01T23:59:59.000Z

34

Daemen Alternative Energy/Geothermal Technologies Demonstration Program Erie County  

NLE Websites -- All DOE Office Websites (Extended Search)

US DOE Geothermal Program US DOE Geothermal Program eere.energy.gov Public Service of Colorado Ponnequin Wind Farm Geothermal Technologies Program 2010 Peer Review Daemen Alternative Energy/Geothermal Technologies Demonstration Program Erie County Robert C. Beiswanger, Jr. Daemen College May 20, 2010 This presentation does not contain any proprietary confidential, or otherwise restricted information. Insert photo of your choice 2 | US DOE Geothermal Program eere.energy.gov DAEMEN COLLEGE Open Loop, Geo-exchange System Geothermal Technologies Program 2010 Peer Review May 20, 2010 3 | US DOE Geothermal Program eere.energy.gov DAEMEN COLLEGE Open Loop, Geo-exchange System Principal Investigators Robert C. Beiswanger Jr. Vice President for Business Affairs and Treasurer Dr. Edwin G. Clausen Vice President for Academic Affairs and Dean of the College

35

UCSD Geothermal Chemical Modeling Project: DOE Advanced Brine Chemistry Program. [University of California at San Diego (UCSD)  

DOE Green Energy (OSTI)

DOE funding to the UCSD Chemical Modeling Group supports research to provide computer models which will reliably characterize the equilibrium chemistry of geothermal brines (solution, solid and gas phases) under variable thermodynamic conditions. With this technology, it will be possible to rapidly and inexpensively predict the chemical behavior of geothermal brines during various resource recovery stages; exploration, production, plant energy extraction and rejection as well as in ancillary programs such as mineral recovery. Our modeling technology is based on recent progress in the physical chemistry of concentrated aqueous solutions. The behavior of these fluids has not been predicted from first principle theories. However, because of the importance of concentrated brines to many industrial and natural processes, there have been numerous efforts to develop accurate phenomenological expressions for predicting the chemical behavior of these brines. One of the most successful of these efforts is that of Pitzer and coworkers. Incorporating the semiempirical equations of Pitzer, we have shown at UCSD that we can create highly accurate models of brine-solid-gas chemistry.

Moeller, N.; Weare, J.H.

1992-04-01T23:59:59.000Z

36

Geothermal induced seismicity program plan  

DOE Green Energy (OSTI)

A plan for a National Geothermal Induced Seismicity Program has been prepared in consultation with a panel of experts from industry, academia, and government. The program calls for baseline seismic monitoring in regions of known future geothermal development, continued seismic monitoring and characterization of earthquakes in zones of geothermal fluid production and injection, modeling of the earthquake-inducing mechanism, and in situ measurement of stresses in the geothermal development. The Geothermal Induced Seismicity Program (GISP) will have as its objectives the evaluation of the seismic hazard, if any, associated with geothermal resource exploitation and the devising of a technology which, when properly utilized, will control or mitigate such hazards.

Not Available

1981-03-01T23:59:59.000Z

37

FY97 Geothermal R&D Program Plan  

SciTech Connect

This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

None

1996-09-01T23:59:59.000Z

38

Federal Geothermal Program Plan for Fiscal Year 1983  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This is a report of the Interagency Geothermal Coordinating Committee (IGCC). (DJE 2005)

None

1983-03-01T23:59:59.000Z

39

Federal Geothermal Research Program Update Fiscal Year 1999  

DOE Green Energy (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

Not Available

2004-02-01T23:59:59.000Z

40

Geothermal energy: 1992 program overview  

DOE Green Energy (OSTI)

Geothermal energy is described in general terms with drawings illustrating the technology. A map of known and potential geothermal resources in the US is included. The 1992 program activities are described briefly. (MHR)

Not Available

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Federal Geothermal Research Program Update Fiscal Year 1994  

DOE Green Energy (OSTI)

The DOE Geothermal Research Program Update reports contain a fair amount of technical detail and management information at the individual project level. (DJE 2005)

None

1995-03-01T23:59:59.000Z

42

Federal Geothermal Research Program Update Fiscal Year 1995  

SciTech Connect

The DOE Geothermal Research Program Update reports contain a fair amount of technical detail and management information at the individual project level. DJE 2005

1996-03-01T23:59:59.000Z

43

Geothermal R&D Program Summary, FY 1988 Project Sheets  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE - 2005)

1988-10-18T23:59:59.000Z

44

Federal Geothermal Research Program Update Fiscal Year 1997  

DOE Green Energy (OSTI)

The DOE Geothermal Research Program Update reports contain a fair amount of technical detail and management information at the individual project level. (DJE 2005)

None

1998-03-01T23:59:59.000Z

45

DOE Updated U.S. Geothermal: Supply Curve (Presentation)  

NLE Websites -- All DOE Office Websites (Extended Search)

2009 DOE GEOTHERMAL SUPPLY CURVE UPDATE: Prepared by the National Renewable Energy Laboratory (NREL) 2009 DOE GEOTHERMAL SUPPLY CURVE UPDATE: Prepared by the National Renewable Energy Laboratory (NREL) eere.energy.gov The Parker Ranch installation in Hawaii Geothermal Technologies Program (GTP) DOE Updated U.S. Geothermal Supply Curve Chad Augustine National Renewable Energy Laboratory Strategic Energy Analysis Center Chad.Augustine@nrel.gov February 1, 2010 Chad Augustine (NREL) Katherine R. Young (NREL) Arlene Anderson (DOE-GTP) NREL/PR-6A2-47527 Pacific Gas & Electric/PIX 00059 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. 2 | 2009 DOE GEOTHERMAL SUPPLY CURVE UPDATE: Prepared by the National Renewable Energy Laboratory (NREL) eere.energy.gov

46

DOE Merges Traditional and Emerging Energy Technologies in New Geothermal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Merges Traditional and Emerging Energy Technologies in New Merges Traditional and Emerging Energy Technologies in New Geothermal Research Initiative DOE Merges Traditional and Emerging Energy Technologies in New Geothermal Research Initiative October 2, 2009 - 1:00pm Addthis Washington, DC - A unique Department of Energy (DOE) collaboration aims to generate electricity from a geothermal source stemming from oilfield operations. DOE's Office of Fossil Energy (FE) and the Office of Energy Efficiency and Renewable Energy's (EERE) Geothermal Technologies Program will merge and leverage research capabilities to demonstrate low temperature geothermal electric power generation systems using co-produced water from oilfield operations at FE's Rocky Mountain Oilfield Testing Center (RMOTC). EERE is providing funding for the purchase of a geothermal electricity

47

DOE Merges Traditional and Emerging Energy Technologies in New Geothermal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Merges Traditional and Emerging Energy Technologies in New Merges Traditional and Emerging Energy Technologies in New Geothermal Research Initiative DOE Merges Traditional and Emerging Energy Technologies in New Geothermal Research Initiative October 2, 2009 - 1:00pm Addthis Washington, DC - A unique Department of Energy (DOE) collaboration aims to generate electricity from a geothermal source stemming from oilfield operations. DOE's Office of Fossil Energy (FE) and the Office of Energy Efficiency and Renewable Energy's (EERE) Geothermal Technologies Program will merge and leverage research capabilities to demonstrate low temperature geothermal electric power generation systems using co-produced water from oilfield operations at FE's Rocky Mountain Oilfield Testing Center (RMOTC). EERE is providing funding for the purchase of a geothermal electricity

48

Federal Geothermal Research Program Update - Fiscal Year 2004 | Open Energy  

Open Energy Info (EERE)

Geothermal Research Program Update - Fiscal Year 2004 Geothermal Research Program Update - Fiscal Year 2004 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Federal Geothermal Research Program Update - Fiscal Year 2004 Details Activities (91) Areas (26) Regions (0) Abstract: The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are

49

Magnetotellurics At Mccoy Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Magnetotellurics Activity Date Usefulness not indicated...

50

Stanford Geothermal Program  

DOE Green Energy (OSTI)

Reliable measurement of steam-water relative permeability functions is of great importance for geothermal reservoir performance simulation. Despite their importance, these functions are poorly known due to the lack of fundamental understanding of steam-water flows, and the difficulty of making direct measurements. The Stanford Geothermal Program has used an X-ray CT (Computer Tomography) scanner to obtain accurate saturation profiles by direct measurement. During the last five years, the authors have carried out experiments with nitrogen-water flow and with steam-water flow, and examined the effects of heat transfer and phase change by comparing these sets of results. In porous rocks, it was found that the steam-water relative permeabilities follow Corey type relationships similar to those in nitrogen-water flow, but that the irreducible gas phase saturation is smaller for steam than for nitrogen. The irreducible saturations represent substantial fractions of the recoverable energy in place yet are hard to determine in the field. Understanding the typical magnitude of irreducible saturations will lead to a much clearer forecast of geothermal field performance. In fracture flow, indirect measurements suggested that the relative permeabilities follow a linear (or ''X-curve'') behavior - but there is still considerable uncertainty in the knowledge of this behavior.

R. Horn

1999-06-30T23:59:59.000Z

51

Tribal Energy Program: Geothermal Energy Resources  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Printable Version Share this resource Send a link to Tribal Energy Program: Geothermal Energy Resources to someone by E-mail Share Tribal Energy Program: Geothermal Energy...

52

Butler Rural Electric Cooperative - Geothermal Rebate Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Butler Rural Electric Cooperative - Geothermal Rebate Program Butler Rural Electric Cooperative - Geothermal Rebate Program...

53

Geothermal Program Overview: Fiscal Years 1993-1994  

SciTech Connect

Geothermal energy represents the largest U.S. energy resource base and already provides an important contribution to our nation's energy needs. This overview looks at the basic science behind the various geothermal technologies and provides information on DOE Geothermal Energy Program activities and accomplishments.

1995-11-01T23:59:59.000Z

54

Geothermal Program Overview: Fiscal Years 1993-1994  

DOE Green Energy (OSTI)

Geothermal energy represents the largest U.S. energy resource base and already provides an important contribution to our nation's energy needs. This overview looks at the basic science behind the various geothermal technologies and provides information on DOE Geothermal Energy Program activities and accomplishments.

Not Available

1995-11-01T23:59:59.000Z

55

Geothermal Program Review XII: proceedings. Geothermal Energy and the President's Climate Change Action Plan  

Science Conference Proceedings (OSTI)

Geothermal Program Review XII, sponsored by the Geothermal Division of US Department of Energy, was held April 25--28, 1994, in San Francisco, California. This annual conference is designed to promote effective technology transfer by bringing together DOE-sponsored researchers; utility representatives; geothermal energy developers; suppliers of geothermal goods and services; representatives from federal, state, and local agencies; and others with an interest in geothermal energy. In-depth reviews of the latest technological advancements and research results are presented during the conference with emphasis on those topics considered to have the greatest potential to impact the near-term commercial development of geothermal energy.

Not Available

1994-12-31T23:59:59.000Z

56

Soil Sampling At Mccoy Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Soil Sampling Activity Date Usefulness not indicated DOE-funding...

57

Field Mapping At Mccoy Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Field Mapping Activity Date Usefulness not indicated DOE-funding...

58

Core Analysis At Flint Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Flint Geothermal Area (DOE GTP) Exploration Activity Details Location Flint Geothermal Area Exploration Technique Core Analysis Activity Date Usefulness not indicated DOE-funding...

59

Geothermal program overview: Fiscal years 1993--1994  

DOE Green Energy (OSTI)

The DOE Geothermal Energy Program is involved in three main areas of research: finding and tapping the resource; power generation; and direct use of geothermal energy. This publication summarizes research accomplishments for FY 1993 and 1994 for the following: geophysical and geochemical technologies; slimhole drilling for exploration; resource assessment; lost circulation control; rock penetration mechanics; instrumentation; Geothermal Drilling Organization; reservoir analysis; brine injection; hot dry rock; The Geysers; Geothermal Technology Organization; heat cycle research; advanced heat rejection; materials development; and advanced brine chemistry.

NONE

1995-11-01T23:59:59.000Z

60

GEOTHERMAL RESERVOIR ENGINEERING MANGEMENT PROGRAM PLAN (GREMP PLAN)  

E-Print Network (OSTI)

2 Mission of Division of Geothermal Energy . . . . .Coordination with Other Geothermal Programs . . . . . . 6the Behavior of Geothermal Systems . . . . . . . . . 1 6

Bloomster, C.H.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Federal Geothermal Research Program Update - Fiscal Year 2004  

DOE Green Energy (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or economical.

Patrick Laney

2005-03-01T23:59:59.000Z

62

Federal Geothermal Research Program Update Fiscal Year 2004  

DOE Green Energy (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or economical.

Not Available

2005-03-01T23:59:59.000Z

63

Federal Geothermal Research Program Update Fiscal Year 2003  

DOE Green Energy (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

Not Available

2004-03-01T23:59:59.000Z

64

Federal Geothermal Research Program Update Fiscal Year 2002  

DOE Green Energy (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

Not Available

2003-09-01T23:59:59.000Z

65

DOE - Office of Legacy Management -- Geothermal  

Office of Legacy Management (LM)

Geothermal Test Facility, California Geothermal Test Facility, California This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Other Documents Fact Sheet Geothermal Test Facility, California, Site Fact Sheet December 12, 2011 Other Documents Geothermal Test Facility (GTF) Closure and Records Transfer (DOE/National Nuclear Security Administration memorandum) April 23, 2004 Closure Report East Mesa Geothermal Test Facility July 31, 1998 Recission of Waste Discharge Requirements for U.S. Department of Energy, Geothermal Test Facility, East Mesa - El Centro, Imperial County (California Regional Water Quality Control Board letter) January 4, 1997

66

Geothermal energy program summary  

DOE Green Energy (OSTI)

This document reviews Geothermal Energy Technology and the steps necessary to place it into service. Specific topics covered are: four types of geothermal resources; putting the resource to work; power generation; FY 1989 accomplishments; hard rock penetration; conversion technology; and geopressured brine research. 16 figs. (FSD)

Not Available

1990-01-01T23:59:59.000Z

67

Geothermal Energy Program Technology Overview  

DOE Green Energy (OSTI)

New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

Not Available

2001-11-01T23:59:59.000Z

68

DOE Office of Indian Energy Foundational Course on Geothermal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GEOTHERMAL GEOTHERMAL Presented by the National Renewable Energy Laboratory Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Course Introduction  Resource Map & Project Scales  Technology Overview(s): - Siting - Costs  Successful Project Example(s)  Policies Relevant to Project Development  Additional Information & Resources 2 Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy & Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading

69

Thermal Gradient Holes At Mccoy Geothermal Area (DOE GTP) | Open...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details...

70

Thermal Gradient Holes At Flint Geothermal Area (DOE GTP) | Open...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Flint Geothermal Area (DOE GTP) Exploration Activity Details...

71

Compound and Elemental Analysis At Flint Geothermal Area (DOE...  

Open Energy Info (EERE)

Geothermal Area (DOE GTP) Exploration Activity Details Location Flint Geothermal Area Exploration Technique Compound and Elemental Analysis Activity Date Usefulness not indicated...

72

Mercury Vapor At Mccoy Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Mercury Vapor At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Mercury Vapor Activity Date Usefulness not...

73

Geothermal direct heat applications program summary  

DOE Green Energy (OSTI)

The use of geothermal energy for direct heat purposes by the private sector within the US has been quite limited to date. However, there is a large potential market for thermal energy in such areas as industrial processing, agribusiness, and space/water heating of commercial and residential buildings. Technical and economic information is needed to assist in identifying prospective direct heat users and to match their energy needs to specific geothermal reservoirs. Technological uncertainties and associated economic risks can influence the user's perception of profitability to the point of limiting private investment in geothermal direct applications. To stimulate development in the direct heat area, the Department of Energy, Division of Geothermal Energy, issued two Program Opportunity Notices (PON's). These solicitations are part of DOE's national geothermal energy program plan, which has as its goal the near-term commercialization by the private sector of hydrothermal resources. Encouragement is being given to the private sector by DOE cost-sharing a portion of the front-end financial risk in a limited number of demonstration projects. The twenty-two projects summarized herein are direct results of the PON solicitations.

None

1980-04-01T23:59:59.000Z

74

DOE Webinar - Residential Geothermal Heat Pump Retrofits (Presentation)  

DOE Green Energy (OSTI)

This presentation was given December 14, 2010, as part of DOE's Webinar series. The presentation discusses geothermal heat pump retrofits, technology options, and an overview of geothermal energy and geothermal heat pumps.

Anderson, E. R.

2010-12-14T23:59:59.000Z

75

Geothermal Energy Research and Development Program; Project Summaries  

Science Conference Proceedings (OSTI)

This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

None

1994-03-01T23:59:59.000Z

76

US Geothermal Energy Program Multiyear Plan, 1988-1992  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

1988-10-01T23:59:59.000Z

77

Geothermal energy. Program summary  

DOE Green Energy (OSTI)

Brief descriptions of geothermal projects funded through the Department of Energy during FY 1978 are presented. Each summary gives the project title, contractor name, contract number, funding level, dates, location, and name of the principal investigator, together with project highlights, which provide informaion such as objectives, strategies, and a brief project description. (MHR)

Not Available

1979-06-01T23:59:59.000Z

78

Geothermal well stimulation program: opening remarks  

SciTech Connect

The history of well stimulation and the development of the geothermal well stimulation program are reviewed briefly. (MHR)

Hanold, R.J.

1980-01-01T23:59:59.000Z

79

Colorado Geothermal Commercialization Program  

DOE Green Energy (OSTI)

Chaffee County, located in central Colorado, has immense potential for geothermal development. This report has been prepared to assist residents and developers in and outside the area to develop the hydrothermal resources of the county. Data has been collected and interpreted from numerous sources in order to introduce a general description of the area, estimate energy requirements, describe the resources and postulate a development plan. Electric power generation and direct heat application potential for the region are described.

Healy, F.C.

1980-04-01T23:59:59.000Z

80

Navy Geothermal Program | Open Energy Information  

Open Energy Info (EERE)

Navy Geothermal Program Navy Geothermal Program Jump to: navigation, search Logo: Navy Geothermal Program Office Name Navy Geothermal Program Office Address 429 East Bowen Road Place China Lake, CA Zip 93555 Year founded 1978 Phone number (760) 939-2700 Website https://portal.navfac.navy.mil References Navy Facilities Engineering Command Website[1] Navy Geothermal Program is an organization based in China Lake, CA. The Navy Geothermal Program Office (GPO) is the Department of Defense's lead organization for the exploration, development, and management of geothermal resources on military controlled land, worldwide. The Department of Defense (DOD) established the GPO in 1978, and designated the Navy as the lead agency for geothermal exploration and development on military lands.

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Geothermal Technologies Program Strategic Plan  

SciTech Connect

This DOE/EERE program strategic plan builds upon previous program plans and R&D direction reviews with industry representatives and other stakeholders.

2004-08-01T23:59:59.000Z

82

Geothermal subsidence research program plan  

DOE Green Energy (OSTI)

A comprehensive research program to investigate subsidence from geothermal energy production was developed from the point of view of a developer of an energy facility and the policy maker who regulates such facilities. The organizational structure, objectives, and time schedule are outlined. Each of the research categories is discussed separately. (MHR)

Not Available

1977-04-01T23:59:59.000Z

83

GEOTHERMAL SUBSIDENCE RESEARCH PROGRAM PLAN  

E-Print Network (OSTI)

of Subsiding Areas and Geothermal Subsidence Potential25 Project 2-Geothermal Subsidence Potential Maps . . . . .Subsidence Caused by a Geothermal Project and Subsidence Due

Lippmann, Marcello J.

2010-01-01T23:59:59.000Z

84

Geothermal Technologies Program Geoscience and Supporting Technologies 2001 University Research Summaries  

SciTech Connect

The U.S. Department of Energy Office of Wind and Geothermal Technologies (DOE) is funding advanced geothermal research through University Geothermal Research solicitations. These solicitations are intended to generate research proposals in the areas of fracture permeability location and characterization, reservoir management and geochemistry. The work funded through these solicitations should stimulate the development of new geothermal electrical generating capacity through increasing scientific knowledge of high-temperature geothermal systems. In order to meet this objective researchers are encouraged to collaborate with the geothermal industry. These objectives and strategies are consistent with DOE Geothermal Energy Program strategic objectives.

Creed, Robert John; Laney, Patrick Thomas

2002-06-01T23:59:59.000Z

85

Geothermal Technologies Program Geoscience and Supporting Technologies 2001 University Research Summaries  

DOE Green Energy (OSTI)

The U.S. Department of Energy Office of Wind and Geothermal Technologies (DOE) is funding advanced geothermal research through University Geothermal Research solicitations. These solicitations are intended to generate research proposals in the areas of fracture permeability location and characterization, reservoir management and geochemistry. The work funded through these solicitations should stimulate the development of new geothermal electrical generating capacity through increasing scientific knowledge of high-temperature geothermal systems. In order to meet this objective researchers are encouraged to collaborate with the geothermal industry. These objectives and strategies are consistent with DOE Geothermal Energy Program strategic objectives.

Creed, R.J.; Laney, P.T.

2002-05-14T23:59:59.000Z

86

Geothermal Tomorrow 2008  

Science Conference Proceedings (OSTI)

Brochure describing the recent activities and future research direction of the DOE Geothermal Program.

Not Available

2008-09-01T23:59:59.000Z

87

Geothermal Program Review XVII: proceedings. Building on 25 years of Geothermal Partnership with Industry  

SciTech Connect

The US Department of Energy's Office (DOE) of Geothermal Technologies conducted its annual Program Review XVII in Berkeley, California, on May 18--20, 1999. The theme this year was "Building on 25 Years of Geothermal Partnership with Industry". In 1974, Congress enacted Public Law 93-410 which sanctioned the Geothermal Energy Coordination and Management Project, the Federal Government's initial partnering with the US geothermal industry. The annual program review provides a forum to foster this federal partnership with the US geothermal industry through the presentation of DOE-funded research papers from leaders in the field, speakers who are prominent in the industry, topical panel discussions and workshops, planning sessions, and the opportunity to exchange ideas. Speakers and researchers from both industry and DOE presented an annual update on research in progress, discussed changes in the environment and deregulated energy market, and exchanged ideas to refine the DOE Strategic Plan for research and development of geothermal resources in the new century. A panel discussion on Climate Change and environmental issues and regulations provided insight into the opportunities and challenges that geothermal project developers encounter. This year, a pilot peer review process was integrated with the program review. A team of geothermal industry experts were asked to evaluate the research in progress that was presented. The evaluation was based on the Government Performance and Results Act (GPRA) criteria and the goals and objectives of the Geothermal Program as set forth in the Strategic Plan. Despite the short timeframe and cursory guidance provided to both the principle investigators and the peer reviewers, the pilot process was successful. Based on post review comments by both presenters and reviewers, the process will be refined for next year's program review.

1999-10-01T23:59:59.000Z

88

Geothermal Program Review XVII: proceedings. Building on 25 years of Geothermal Partnership with Industry  

DOE Green Energy (OSTI)

The US Department of Energy's Office (DOE) of Geothermal Technologies conducted its annual Program Review XVII in Berkeley, California, on May 18--20, 1999. The theme this year was "Building on 25 Years of Geothermal Partnership with Industry". In 1974, Congress enacted Public Law 93-410 which sanctioned the Geothermal Energy Coordination and Management Project, the Federal Government's initial partnering with the US geothermal industry. The annual program review provides a forum to foster this federal partnership with the US geothermal industry through the presentation of DOE-funded research papers from leaders in the field, speakers who are prominent in the industry, topical panel discussions and workshops, planning sessions, and the opportunity to exchange ideas. Speakers and researchers from both industry and DOE presented an annual update on research in progress, discussed changes in the environment and deregulated energy market, and exchanged ideas to refine the DOE Strategic Plan for research and development of geothermal resources in the new century. A panel discussion on Climate Change and environmental issues and regulations provided insight into the opportunities and challenges that geothermal project developers encounter. This year, a pilot peer review process was integrated with the program review. A team of geothermal industry experts were asked to evaluate the research in progress that was presented. The evaluation was based on the Government Performance and Results Act (GPRA) criteria and the goals and objectives of the Geothermal Program as set forth in the Strategic Plan. Despite the short timeframe and cursory guidance provided to both the principle investigators and the peer reviewers, the pilot process was successful. Based on post review comments by both presenters and reviewers, the process will be refined for next year's program review.

NONE

1999-10-01T23:59:59.000Z

89

Geothermal Energy Program Overview: Fiscal Year 1991  

DOE Green Energy (OSTI)

In FY 1990-1991, the Geothermal Energy Program made significant strides in hydrothermal, geopressured brine, hot dry rock, and magma research, continuing a 20-year tradition of advances in geothermal technology.

Not Available

1991-12-01T23:59:59.000Z

90

2-M Probe At Flint Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flint Geothermal Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: 2-M Probe At Flint Geothermal Area (DOE GTP) Exploration Activity...

91

Gamma Log At Flint Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flint Geothermal Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Gamma Log At Flint Geothermal Area (DOE GTP) Exploration Activity...

92

Pressure Temperature Log At Flint Geothermal Area (DOE GTP) ...  

Open Energy Info (EERE)

Area (DOE GTP) Exploration Activity Details Location Flint Geothermal Area Exploration Technique Pressure Temperature Log Activity Date Usefulness not indicated DOE-funding Unknown...

93

Geothermal Energy R&D Program: Annual Progress Report for Fiscal Year 1991  

Science Conference Proceedings (OSTI)

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form.

None

1992-03-01T23:59:59.000Z

94

Geothermal Energy R&D Program: Annual Progress Report for Fiscal Year 1989  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form.

1990-04-01T23:59:59.000Z

95

Geothermal Energy R&D Program Annual Progress Report for Fiscal Year 1989 Draft  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE -2005)

1990-04-01T23:59:59.000Z

96

DOE Mentoring Program Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

our employees have fulfilling and productive careers within the Department. DOE Strategic Plan (May 2011) DOE Mentoring Program Page 2 June 2012 Table of Contents DOE...

97

1978 annual report, INEL geothermal environmental program  

DOE Green Energy (OSTI)

The objective of the Raft River Geothermal Environmental Program, in its fifth year, is to characterize the beneficial and detrimental impacts resulting from the development of moderate-temperature geothermal resources in the valley. This report summarizes the monitoring and research efforts conducted as part of this program in 1978. The results of these monitoring programs will be used to determine the mitigation efforts required to reduce long-term impacts resulting from geothermal development.

Spencer, S.G.; Sullivan, J.F.; Stanley, N.E.

1979-04-01T23:59:59.000Z

98

Colorado State Capitol Building Geothermal Program Geothermal Project |  

Open Energy Info (EERE)

State Capitol Building Geothermal Program Geothermal Project State Capitol Building Geothermal Program Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Colorado State Capitol Building Geothermal Program Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 1: Technology Demonstration Projects Project Description This building is approximately 100 years old, and much of the building is heated with expensive district steam and lacks sufficient central cooling. The requested funding pertains to Topic Area 1 Technology Demonstration Projects. Funding would be used for Phase I - Feasibility Study and Engineering Design, Phase II - Installation and Commissioning of Equipment, and Phase III - Operation, Data Collection, and Marketing. Geothermal energy provided by an open-loop ground source heat pump system and upgrades to the building HVAC systems will reduce consumption of electricity and utility steam created with natural gas. Additionally, comfort, operations and maintenance, and air quality will be improved as a result. It is anticipated that the open loop GHP system will require a 500-650 gpm water flow rate.

99

Strategic plan for the geothermal energy program  

SciTech Connect

Geothermal energy (natural heat in the Earth`s crust) represents a truly enormous amount of energy. The heat content of domestic geothermal resources is estimated to be 70,000,000 quads, equivalent to a 750,000-year supply of energy for the entire Nation at current rates of consumption. World geothermal resources (exclusive of resources under the oceans) may be as much as 20 times larger than those of the US. While industry has focused on hydrothermal resources (those containing hot water and/or steam), the long-term future of geothermal energy lies in developing technology to enable use of the full range of geothermal resources. In the foreseeable future, heat may be extracted directly from very hot rocks or from molten rocks, if suitable technology can be developed. The US Department of Energy`s Office of Geothermal Technologies (OGT) endorses a vision of the future in which geothermal energy will be the preferred alternative to polluting energy sources. The mission of the Program is to work in partnership with US industry to establish geothermal energy as a sustainable, environmentally sound, economically competitive contributor to the US and world energy supply. In executing its mission and achieving its long-term vision for geothermal energy, the Program has identified five strategic goals: electric power generation; direct use applications and geothermal heat pumps; international geothermal development; science and technology; and future geothermal resources. This report discusses the objectives of these five goals.

1998-06-01T23:59:59.000Z

100

Geothermal programs at Lawrence Livermore National Laboratory  

DOE Green Energy (OSTI)

Lawrence Livermore National Laboratory has a number of geothermal programs supported through two offices in the Department of Energy: the Office of Renewable Technologies, Geothermal Technologies Division, and the Office of Basic Energy Sciences, Division of Engineering, Mathematics and Geosciences. Within these programs, we are carrying out research in injection monitoring, optical instrumentation for geothermal wells, seismic imaging methods, geophysical and drilling investigations of young volcanic systems in California, and fundamental studies of the rock and mineral properties.

Kasameyer, P.W.; Younker, L.W.

1987-07-10T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The geothermal program at Lawrence Berkeley Laboratory  

DOE Green Energy (OSTI)

The main purpose of the geothermal program at Lawrence Berkeley Laboratory is to develop, improve and validate methods and instrumentation to: (1) determine geothermal reservoir parameters; (2) detect and characterize reservoir fractures and boundaries; and (3) identify and evaluate the importance of reservoir processes. The ultimate objective of the program, which includes field, theoretical and modeling activities, is to advance the state-of-the-art for characterizing geothermal systems and evaluating their productive capacity and longevity under commercial exploitation.

Lippmann, M.J.

1987-06-01T23:59:59.000Z

102

Recovery Act - Geothermal Technologies Program:Ground Source...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act - Geothermal Technologies Program:Ground Source Heat Pumps Recovery Act - Geothermal Technologies Program:Ground Source Heat Pumps A detailled description of the...

103

Observation Wells At Mccoy Geothermal Area (DOE GTP) | Open Energy  

Open Energy Info (EERE)

Observation Wells At Mccoy Geothermal Area (DOE GTP) Observation Wells At Mccoy Geothermal Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Observation Wells At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Observation Wells Activity Date Usefulness not indicated DOE-funding Unknown Notes 4 wells References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Observation_Wells_At_Mccoy_Geothermal_Area_(DOE_GTP)&oldid=402599" Categories: Exploration Activities DOE Funded Activities ARRA Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services

104

DOE 2009 Geothermal Risk Analysis: Methodology and Results (Presentation)  

Science Conference Proceedings (OSTI)

This presentation summarizes the methodology and results for a probabilistic risk analysis of research, development, and demonstration work-primarily for enhanced geothermal systems (EGS)-sponsored by the U.S. Department of Energy Geothermal Technologies Program.

Young, K. R.; Augustine, C.; Anderson, A.

2010-02-01T23:59:59.000Z

105

Geothermal Program Review XIV: proceedings. Keeping Geothermal Energy Competitive in Foreign and Domestic Markets  

SciTech Connect

The U.S. Department of Energy`s Office of Geothermal Technologies conducted its annual Program Review XIV in Berkeley, April 8-10, 1996. The geothermal community came together for an in-depth review of the federally-sponsored geothermal research and development program. This year`s theme focused on ``Keeping Geothermal Energy Competitive in Foreign and Domestic Markets.`` This annual conference is designed to promote technology transfer by bringing together DOE-sponsored researchers; utility representatives; geothermal developers; equipment and service suppliers; representatives from local, state, and federal agencies; and others with an interest in geothermal energy. Program Review XIV consisted of eight sessions chaired by industry representatives. Introductory and overview remarks were presented during every session followed by detailed reports on specific DOE-funded research projects. The progress of R&D projects over the past year and plans for future activities were discussed. The government-industry partnership continues to strengthen -- its success, achievements over the past twenty years, and its future direction were highlighted throughout the conference. The comments received from the conference evaluation forms are published in this year`s proceedings. Individual papers have been processed for inclusion in the Energy Science and Technology Database.

1996-01-01T23:59:59.000Z

106

Federal Geothermal Research Program Update Fiscal Year 1998  

DOE Green Energy (OSTI)

This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

Keller, J.G.

1999-05-01T23:59:59.000Z

107

Federal Geothermal Research Program Update Fiscal Year 1998  

SciTech Connect

This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

Keller, J.G.

1999-05-01T23:59:59.000Z

108

ORISE: 2012 DOE EERE National Geothermal Student Competition  

NLE Websites -- All DOE Office Websites (Extended Search)

Winners of 2012 DOE EERE National Geothermal Student Competition Announced Winners of 2012 DOE EERE National Geothermal Student Competition Announced The U.S. Department of Energy announced the top three winners in the 2012 National Geothermal Student Competition at the 36th Annual Geothermal Resources Council Meeting in Reno, Nevada. This student competition challenged teams at universities across the country to conduct cutting-edge research in geology, geoscience, chemical and bio-molecular energy, and engineering that could lead to breakthroughs in geothermal energy development. First place: Idaho State University Second place: Boise State University Third place: Southern Methodist University Geothermal Laboratory Geothermal power station First place winners: Idaho State University Photo courtesy of the Geothermal Resources Council

109

Salt Wells Geothermal Exploratory Drilling Program EA  

Open Energy Info (EERE)

Salt Wells Geothermal Exploratory Drilling Program EA Salt Wells Geothermal Exploratory Drilling Program EA (DOI-BLM-NV-C010-2009-0006-EA) Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells Geothermal Exploratory Drilling Program EA (DOI-BLM-NV-C010-2009-0006-EA) Abstract No abstract available. Author Bureau of Land Management Published U.S. Department of the Interior- Bureau of Land Management, Carson City Field Office, Nevada, 09/14/2009 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Salt Wells Geothermal Exploratory Drilling Program EA (DOI-BLM-NV-C010-2009-0006-EA) Citation Bureau of Land Management. Salt Wells Geothermal Exploratory Drilling Program EA (DOI-BLM-NV-C010-2009-0006-EA) [Internet]. 09/14/2009. Carson City, NV. U.S. Department of the Interior- Bureau of Land Management,

110

DOE Office of Indian Energy Foundational Course on Geothermal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE OFFICE OF INDIAN ENERGY Foundational Courses Renewable Energy Technologies GEOTHERMAL Presented by the National Renewable Energy Laboratory Course Outline What we will cover......

111

ORISE: 2012 DOE EERE National Geothermal Student Competition  

NLE Websites -- All DOE Office Websites (Extended Search)

Work With Us Contact Us Oak Ridge Institute for Science Education Winners of 2012 DOE EERE National Geothermal Student Competition Announced The U.S. Department of Energy...

112

DOE REAL-TIME SEISMIC MONITORING AT ENHANCED GEOTHERMAL SYSTEM SITES | Open  

Open Energy Info (EERE)

REAL-TIME SEISMIC MONITORING AT ENHANCED GEOTHERMAL SYSTEM SITES REAL-TIME SEISMIC MONITORING AT ENHANCED GEOTHERMAL SYSTEM SITES Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Proceedings: DOE REAL-TIME SEISMIC MONITORING AT ENHANCED GEOTHERMAL SYSTEM SITES Details Activities (6) Areas (6) Regions (0) Abstract: Lawrence Berkeley National Laboratory (LBNL) at the direction of the United States Department of Energy (DOE) Geothermal Technologies EGS Program is installing, operating, and/or interfacing seismic arrays at multiple Enhanced Geothermal Systems (EGS) sites. The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality

113

Federal Energy Management Program: Geothermal Resources and Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Geothermal Geothermal Resources and Technologies to someone by E-mail Share Federal Energy Management Program: Geothermal Resources and Technologies on Facebook Tweet about Federal Energy Management Program: Geothermal Resources and Technologies on Twitter Bookmark Federal Energy Management Program: Geothermal Resources and Technologies on Google Bookmark Federal Energy Management Program: Geothermal Resources and Technologies on Delicious Rank Federal Energy Management Program: Geothermal Resources and Technologies on Digg Find More places to share Federal Energy Management Program: Geothermal Resources and Technologies on AddThis.com... Energy-Efficient Products Technology Deployment Renewable Energy Federal Requirements Renewable Resources & Technologies Solar Wind

114

GEOTHERMAL SUBSIDENCE RESEARCH PROGRAM PLAN  

E-Print Network (OSTI)

of Subsiding Areas and Geothermal Subsidence Potential25 Project l-Subsidence Case Histories . . . . . . . . . .8 . Subsidence Models . . . . . . . . . . . . . . . .

Lippmann, Marcello J.

2010-01-01T23:59:59.000Z

115

DOE Office of Indian Energy Foundational Course on Geothermal Energy Text Version  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geothermal Webinar Geothermal Webinar (text version) Below is the text version of the Webinar titled "DOE Office of Indian Energy Foundational Course: Geothermal Energy as a Renewable Energy." Amy Hollander: Hello. I'm Amy Hollander with the National Renewable Energy Laboratory. Welcome to today's webinar on Geothermal Energy as a Renewable Energy, sponsored by the U.S. Department of Energy Office of Indian Energy Policy and Programs. This webinar is being recorded from DOE's National Renewable Energy Laboratory's brand new, state of the art net-zero energy research support facility in Golden, Colorado. Our Geothermal presentation today is one of nine foundational webinars in this series from the DOE Office of Indian Energy Education Initiative designed to assist tribes with energy

116

Phase I Report, US DOE GRED II Program  

DOE Green Energy (OSTI)

Noramex Corporation Inc, a Nevada company, owns a 100% interest in geothermal leases at the Blue Mountain Geothermal Area, Humboldt County, Nevada. The company is exploring the site for a geothermal resource suitable for development for electric power generation or In the spring of 2002, Noramex drilled the first geothermal observation hole at Blue Mountain, under a cost-share program with the U.S Department of Energy (DOE), under the DOE's Geothermal Exploration and Resource Definition (GRED) program, (Cooperative Agreement No. DE-FC04-00AL66972). DEEP BLUE No.1 was drilled to a total depth of 672.1 meters (2205 feet) and recorded a maximum temperature of 144.7 C (292.5 F). Noramex Corporation will now drill a second slim geothermal observation test hole at Blue Mountain, designated DEEP BLUE No.2. The hole will be drilled under a cost-share program with the DOE, under the DOE's Geothermal Exploration and Resource Definition II (GRED II) program, (Cooperative Agreement No. DE-FC04-2002AL68297). This report comprises Phase I of Cooperative Agreement No. DE-FC04-2002AL68297 of the GRED II program. The report provides an update on the status of resource confirmation at the Blue Mountain Geothermal Area, incorporating the results from DEEP BLUE No.1, and provides the technical background for a second test hole. The report also outlines the proposed drilling program for slim geothermal observation test hole DEEP BLUE No.2.

Fairbank Engineering Ltd.

2003-04-23T23:59:59.000Z

117

Slim Holes At Flint Geothermal Area (DOE GTP) | Open Energy Informatio...  

Open Energy Info (EERE)

Flint Geothermal Area (DOE GTP) Exploration Activity Details Location Flint Geothermal Area Exploration Technique Slim Holes Activity Date Usefulness not indicated DOE-funding...

118

White County REMC - Residential Geothermal Heat Pump Rebate Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings White County REMC - Residential Geothermal Heat Pump Rebate Program White County REMC - Residential Geothermal Heat Pump Rebate...

119

Geothermal: Sponsored by OSTI -- Programs in Renewable Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

GEOTHERMAL TECHNOLOGIES LEGACY COLLECTION - Sponsored by OSTI -- Programs in Renewable Energy Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log...

120

Geothermal Energy Research Development and Demonstration Program  

DOE Green Energy (OSTI)

The Federal program's goal, strategy, plans, and achievements are summarized. In addition, geothermal development by state and local governments and, where available, by the private sector is described. (MHR)

Not Available

1980-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE Geothermal Technologies Office | Open Energy Information  

Open Energy Info (EERE)

Office Office Jump to: navigation, search Name Department of Energy - Energy Efficiency and Renewable Energy - Geothermal Technologies Office Short Name DOE GTO Place Washington, District of Columbia Coordinates 38.8869784°, -77.0252967° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8869784,"lon":-77.0252967,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

122

DOE Mentoring Program Guide  

Energy.gov (U.S. Department of Energy (DOE))

If you are interested in continuous learning and self-development, the DOE Mentoring Program is for you. This guide will provide you with general information regarding mentoring at DOE. Learning...

123

New Mexico Geothermal Commercialization Program. Final report  

SciTech Connect

The New Mexico Geothermal Commercialization Program was developed as a mission-oriented program aimed at accelerating the commercial utilization of geothermal resources. The program provided the US Department of Energy, the State of New Mexico, and the citizens of the state a technical and economic guide for geothermal applications and implementation. This was accomplished by developing market strategies, cultivating public outreach, serving as a broker where appropriate and by providing limited economic and engineering evaluation of specific resource applications. The State of New Mexico used the Commercialization Program as a means to organize, focus and direct all of the state geothermal research, development and demonstration. This action enhanced geothermal development and was strategic to securing $1.8 million from the legislature for geothermal demonstrations. The Commercialization Team identified electrical and direct-use prospects throughout the State. A total of ten sites were classified as inferred electrical grade sites; four sites were classified as potential electrical grade sites; and one site was classified as a proven electrical grade site. Thirty-one sites were classified as direct-use sites: (ten proven, eleven potential and ten inferred). The Commercialization Team defined one geographical area for which the development and utilization of geothermal energy prospects are likely by the year 2020. The Team developed an Area Development Plan for the Rio Grande Rift throughout its entire length within the state.

Scudella, G.

1984-02-01T23:59:59.000Z

124

INEL geothermal environmental program. 1980 annual report  

DOE Green Energy (OSTI)

An overview of continuing environmental research and monitoring programs conducted at the Raft River Geothermal Site is provided. The monitoring programs are designed to collect data on the physical, biological and human environments of the development area. Primary research during 1980 emphasized completing baseline studies on terrestrial fauna, establishing an air quality monitoring network, investigating potential sources of fluoride in the Raft River Valley, and studying water level changes in the shallow monitor wells in response to development of the geothermal resource.

Cahn, L.S.; Thurow, T.L.; Martinez, J.A.

1981-04-01T23:59:59.000Z

125

Geothermal energy program summary: Volume 1: Overview Fiscal Year 1988  

DOE Green Energy (OSTI)

Geothermal energy is a here-and-now technology for use with dry steam resources and high-quality hydrothermal liquids. These resources are supplying about 6% of all electricity used in California. However, the competitiveness of power generation using lower quality hydrothermal fluids, geopressured brines, hot dry rock, and magma still depends on the technology improvements sought by the DOE Geothermal Energy R and D Program. The successful outcome of the R and D initiatives will serve to benefit the US public in a number of ways. First, if a substantial portion of our geothermal resources can be used economically, they will add a very large source of secure, indigenous energy to the nation's energy supply. In addition, geothermal plants can be brought on line quickly in case of a national energy emergency. Geothermal energy is also a highly reliable resource, with very high plant availability. For example, new dry steam plants at The Geysers are operable over 99% of the time, and the small flash plant in Hawaii, only the second in the United States, has an availability factor of 98%. Geothermal plants also offer a viable baseload alternative to fossil and nuclear plants -- they are on line 24 hours a day, unaffected by diurnal or seasonal variations. The hydrothermal power plants with modern emission control technology have proved to have minimal environmental impact. The results to date with geopressured and hot dry rock resources suggest that they, too, can be operated so as to reduce environmental effects to well within the limits of acceptability. Preliminary studies on magma are also encouraging. In summary, the character and potential of geothermal energy, together with the accomplishments of DOE's Geothermal R and D Program, ensure that this huge energy resource will play a major role in future US energy markets. 7 figs.

Not Available

1989-02-01T23:59:59.000Z

126

Geothermal energy program summary: Volume 1: Overview Fiscal Year 1988  

SciTech Connect

Geothermal energy is a here-and-now technology for use with dry steam resources and high-quality hydrothermal liquids. These resources are supplying about 6% of all electricity used in California. However, the competitiveness of power generation using lower quality hydrothermal fluids, geopressured brines, hot dry rock, and magma still depends on the technology improvements sought by the DOE Geothermal Energy R and D Program. The successful outcome of the R and D initiatives will serve to benefit the US public in a number of ways. First, if a substantial portion of our geothermal resources can be used economically, they will add a very large source of secure, indigenous energy to the nation's energy supply. In addition, geothermal plants can be brought on line quickly in case of a national energy emergency. Geothermal energy is also a highly reliable resource, with very high plant availability. For example, new dry steam plants at The Geysers are operable over 99% of the time, and the small flash plant in Hawaii, only the second in the United States, has an availability factor of 98%. Geothermal plants also offer a viable baseload alternative to fossil and nuclear plants -- they are on line 24 hours a day, unaffected by diurnal or seasonal variations. The hydrothermal power plants with modern emission control technology have proved to have minimal environmental impact. The results to date with geopressured and hot dry rock resources suggest that they, too, can be operated so as to reduce environmental effects to well within the limits of acceptability. Preliminary studies on magma are also encouraging. In summary, the character and potential of geothermal energy, together with the accomplishments of DOE's Geothermal R and D Program, ensure that this huge energy resource will play a major role in future US energy markets. 7 figs.

1989-02-01T23:59:59.000Z

127

ORISE: DOE EERE National Geothermal Student Competition  

NLE Websites -- All DOE Office Websites (Extended Search)

National Geothermal Student Competition Mentor Training Center for Science Education Internships, Scholarships and Fellowships Overview Undergraduates Graduate Students Recent...

128

Geothermal reservoir technology research at the DOE Idaho Operations Office  

SciTech Connect

Geothermal reservoir technology research projects managed at the Department of Energy Idaho Falls Operations office (DOE-ID) account for a large portion of the Department of Energy funding for reservoir technology research (approximately 7 million dollars in FY-95). DOE-ID managed projects include industry coupled geothermal exploration drilling, cooperative research projects initiated through the Geothermal Technology Organization (GTO), and other geothermal reservoir technology research projects. A solicitation for cost-shared industry coupled drilling has been completed and one zward has been made in FY-95. Another solicitation for industry coupled drilling may be conducted in the spring of 1996. A separate geothermal research technology research, development and demonstration solicitation will result in multiple year awards over the next 2 years. The goals of these solicitations are to ensure competition for federal money and to get the Government and the geothermal industry the most useful information for their research dollars.

Creed, Bob

1996-01-24T23:59:59.000Z

129

DOE Geothermal well stimulation program  

DOE Green Energy (OSTI)

An effective stimulation treatment requires the interaction of four separate items: frac fluids, proppants, equipment, and planned and properly engineered schedules. While there are good fluid systems and proppants, only judicious combinations and a well thought out schedule which uses all of these materials and available equipment to best advantage is an optimum stimulation treatment. Generally, high flow rates and convective cooling can be used either with conventional (planar) fracturing or with a dendritic fracturing technique. Many of todays fluid systems have been tested to above 400/sup 0/F. Some fluids have survived quite well. Current tests on proppants have shown temperature sensitivities in sand; however, there are resin coated materials and sintered bauxite which are not temperature sensitive. (MHR)

Hanold, R.J.; Campbell, D.A.; Sinclair, A.R.

1980-10-20T23:59:59.000Z

130

Federal Geothermal Research Program Update, FY 2000  

DOE Green Energy (OSTI)

The Department of Energy's Geothermal Program serves two broad purposes: 1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and 2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

Renner, Joel Lawrence

2001-08-01T23:59:59.000Z

131

INEL Geothermal Environmental Program. 1979 annual report  

DOE Green Energy (OSTI)

The Raft River Geothermal Environmental Program is designed to assess beneficial and detrimental impacts to the ecosystem resulting from the development of moderate temperature geothermal resources in the valley. The results of this research contribute to developing an understanding of Raft River Valley ecology and provide a basis for making management decisions to reduce potential long-term detrimental impacts on the environment. The environmental monitoring and research efforts conducted during the past six years of geothermal development and planned future research are summarized.

Thurow, T.L.; Sullivan, J.F.

1980-04-01T23:59:59.000Z

132

DOE Laboratory Accreditation Program - Library  

NLE Websites -- All DOE Office Websites (Extended Search)

Library DOE Laboratory Accreditation Program DOELAP Regulatory Basis 10 CFR 835.402, Individual Monitoring, as amended DOELAP Program Administration DOE-STD 1111-98, DOE Laboratory...

133

DOE Leverages Fossil Energy Expertise to Develop and Explore Geothermal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Leverages Fossil Energy Expertise to Develop and Explore Leverages Fossil Energy Expertise to Develop and Explore Geothermal Energy Resources DOE Leverages Fossil Energy Expertise to Develop and Explore Geothermal Energy Resources February 7, 2011 - 12:00pm Addthis Washington, D.C. - Focusing on reducing the upfront costs of geothermal development as well as improve its effectiveness, the U.S. Department of Energy today announced plans to leverage oil and gas expertise to test the reliability and efficiency of geothermal power generation at oil and gas fields. DOE's Office of Fossil Energy and Office of Energy Efficiency and Renewable Energy will combine efforts to have experts test and validate low temperature geothermal power generation technologies at the Rocky Mountain Oilfield Testing Center (RMOTC) near Casper, Wyoming.

134

INEL Geothermal Environmental Program. Final environmental report  

DOE Green Energy (OSTI)

An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

Thurow, T.L.; Cahn, L.S.

1982-09-01T23:59:59.000Z

135

Flow Test At Mccoy Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated...

136

Gas Flux Sampling At Mccoy Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Gas Flux Sampling At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location...

137

Flow Test At Flint Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Flint Geothermal Area (DOE GTP) Exploration Activity Details Location Flint...

138

Geothermal Research Program of the US Geological Survey  

DOE Green Energy (OSTI)

The beginning of the Geothermal Research Program, its organization, objectives, fiscal history, accomplishments, and present emphasis. The projects of the Geothermal Research Program are presented along with a list of references.

Duffield, W.A.; Guffanti, M.

1981-01-01T23:59:59.000Z

139

Geothermal energy, research, development and demonstration program. Second annual report  

DOE Green Energy (OSTI)

The discussion is presented under the following section headings: executive summary; national geothermal utilization estimates; Federal Geothermal Energy Program objective; Federal Geothermal Energy strategy; Federal Program planning, implementation, and progress monitoring; organization of the report; national progress and achievements; regional progress and accomplishments; fiscal year 1978 activities; federal program activities in fiscal year 1979 and beyond; Appendix A--interagency coordination and program management Interagency Geothermal Coordinating Council (IGCC); and appendix B--international activities.

Not Available

1978-04-01T23:59:59.000Z

140

Geothermal Reservoir Technology Research Program: Abstracts of selected research projects  

DOE Green Energy (OSTI)

Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

Reed, M.J. (ed.)

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Phase I Report, Us Doe Gred Ii Program | Open Energy Information  

Open Energy Info (EERE)

Report, Us Doe Gred Ii Program Report, Us Doe Gred Ii Program Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Phase I Report, Us Doe Gred Ii Program Details Activities (9) Areas (1) Regions (0) Abstract: Noramex Corporation Inc, a Nevada company, owns a 100% interest in geothermal leases at the Blue Mountain Geothermal Area, Humboldt County, Nevada. The company is exploring the site for a geothermal resource suitable for development for electric power generation or In the spring of 2002, Noramex drilled the first geothermal observation hole at Blue Mountain, under a cost-share program with the U.S Department of Energy (DOE), under the DOE's Geothermal Exploration and Resource Definition (GRED) program, (Cooperative Agreement No. DE-FC04-00AL66972). DEEP BLUE No.1 was drilled to a total depth of 672.1 meters (2205 feet) and recorded

142

Geothermal Logging Instrumentation Development Program Plan (U)  

DOE Green Energy (OSTI)

This Geothermal Logging Instrumentation Development Program Plan outlines a nine-year, industry-based program to develop and apply high temperature instrumentation technology which is needed by the borehole logging industry to serve the rapidly expanding geothermal market. Specifically, this program will upgrade existing materials and sondes to improve their high-temperature reliability. To achieve this goal specialized equipment such as high temperature electronics, cables and devices for measuring formation temperature, flow rate, downhole pressure, and fractures will be developed. In order to satisfy critical existing needs, the near-term (FY80) goal is for operation at or above 275/sup 0/C in pressures up to 48.3 MPa (7,000 psi). The long-term (FY84) goal is for operation up to 350/sup 0/C and 138 MPa (20,000 psi). This program plan has been prepared for the Department of Energy's Division of Geothermal Energy (DGE) and is a portion of the DGE long-range Geothermal Well Technology Program.

Veneruso, A.F.; Polito, J.; Heckman, R.C.

1978-08-01T23:59:59.000Z

143

Geothermal Program Review VI: proceedings. Beyond goals and objectives  

DOE Green Energy (OSTI)

Program Review VI was comprised of six sessions, including an opening session, four technical sessions that addressed each of the major DOE research areas, and a session on special issues. The technical sessions were on Hydrothermal, Hot Dry Rock, Geopressured and Magma resources. Presenters in the technical sessions discussed their R and D activities within the context of specific GTD Programmatic Objectives for that technology, their progress toward achieving those objectives, and the value of those achievements to industry. The ''Special Issues'' presentations addressed several topics such as the interactions between government and industry on geothermal energy R and D; the origin and basis for the programmatic objectives analytical computer model; and international marketing opportunities for US geothermal equipment and services. The unique aspect of Program Review VI was that it was held in conjunction with the National Geothermal Association's Industry Round Table on Federal R and D. The Round Table provided a forum for open and lively discussions between industry and government researchers and gave industry an opportunity to convey their needs and perspectives on DOE's research programs. These discussions also provided valuable information to DOE regarding industry's priorities and directions.

Not Available

1988-01-01T23:59:59.000Z

144

Low-Temperature Geothermal Resources, Geothermal Technologies Program (GTP) (Fact Sheet)  

Science Conference Proceedings (OSTI)

This document highlights the applications of low-temperature geothermal resources and the potential for future uses as well as current Geothermal Technologies Program-funded projects related to low-temperature resources.

Not Available

2010-05-01T23:59:59.000Z

145

Geothermal Reservoir Well Stimulation Program: technology transfer  

DOE Green Energy (OSTI)

To assess the stimulation technology developed in the oil and gas industry as to its applicability to the problems of geothermal well stimulation, a literature search was performed through on-line computer systems. Also, field records of well stimulation programs that have worked successfully were obtained from oil and gas operators and service companies. The results of these surveys are presented. (MHR)

Not Available

1980-05-01T23:59:59.000Z

146

Geothermal Technology Development Program. Annual progress report, October 1983-September 1984  

DOE Green Energy (OSTI)

This report describes the status of ongoing Research and Development (R and D) within the Geothermal Technology Development Program. The work reported is sponsored by the Department of Energy/Geothermal Hydropower Technology Division (DOE/GHTD), with program management provided by Sandia National Laboratories. The program emphasizes research in rock penetration mechanics, fluid technology, borehole mechanics, diagnostics technology, and permeability enhancement. 102 figs., 16 tabs.

Kelsey, J.R. (ed.)

1985-08-01T23:59:59.000Z

147

Geothermal Program Review X: proceedings. Geothermal Energy and the Utility Market -- the Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market  

DOE Green Energy (OSTI)

Each year the Geothermal Division of the US Department of Energy conducts an in-depth review of its entire geothermal R&D program. The conference serves several purposes: a status report on current R&D activities, an assessment of progress and problems, a review of management issues, and a technology transfer opportunity between DOE and the US geothermal city. This year`s conference, Program Review X, was held in San Francisco on March 24--26, 1992. The theme of the review, ``Geothermal Energy and the Utility Market -- The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market,`` focused on the needs of the electric utility sector. Geothermal energy, with its power capacity potential of 10 GWe by the year 2010, can provide reliable, enviromentally clean electricity which can help offset the projected increase in demand. Program Review X consisted of seven sessions including an opening session with presentations by Mr. Vikram Budhraja, Vice President of System Planning and Operations, Southern California Edison Company, and Mr. Richard Jaros, President and Chief Operating Officer, California Energy Company. The six technical sessions included presentations by the relevant field researchers covering DOE-sponsored R&D in hydrothermal, hot dry rock, and geopressured energy. Individual projects are processed separately for the data bases.

Not Available

1992-01-01T23:59:59.000Z

148

Geothermal energy, research, development and demonstration program. Third annual report  

DOE Green Energy (OSTI)

The following topics are covered: the geothermal resource potential in the U.S., national geothermal utilization estimates, the Federal geothermal development strategy and program, Federal progress and achievements FY 1978, regional progress FY 1978, and Federal program plans for FY 1979. (MHR)

Not Available

1979-03-01T23:59:59.000Z

149

Edison's Geothermal Program - 1980 Update  

DOE Green Energy (OSTI)

In 1975, negotiations were initiated with two major resource developers toward initiating power plant projects at three of the Imperial Valley resource areas, Brawley, Salton Sea and Heber. The projects at Brawley and Salton Sea are substantially different from that at Heber in objective, size and design. The reasons for these differences are related to the different nature of the geothermal brines and to different operating philosophies of the resource developers involved. The projects at Brawley and Salton Sea include the construction and operation by Edison of 10 MW (gross) units. The contracts with the field developer for these resources are such that Edison will purchase steam. It is, therefore, the developer's responsibility to drill and complete the geothermal production and injection wells, and to construct and operate the steam separators and flash vessels, brine processing equipment, injection pumps, and steam scrubbing equipment. These units are 10 MW rather than 50 to 100 MW due to the technical risks associated with producing, handling and injecting the very high salinity brines at these locations. In addition, the reliability of turbine operation with relatively impure steam is a major concern. The Heber plant, on the other hand, will utilize a much cleaner resource. The technical risk is, therefore, judged to be substantially lower. The plant at Heber will be a commercial 45 MW unit. Edison will buy brine, and will own and operate all of the brine handling equipment except for the wells and collection manifolds.

Crane, George K.

1980-12-01T23:59:59.000Z

150

DOE Technical Assistance Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Retrieving Customer Usage Data from Utilities Retrieving Customer Usage Data from Utilities The Parker Ranch installation in Hawaii Collection of Customer Data for Better Buildings Guidelines For Retrieving Customer Usage Data from Utility Keith Freischlag and Curtis Framel Southwest Energy Efficiency Project DOE Technical Assistance Program Team 4 - Program & Project Development & Implementation December 16, 2010 Guidelines for Retrieving Customer Usage Data from Utilities Webinar Overview * Technical Assistance Program (TAP) * Discussion of Identifying Utility Stakeholders * Discussion of Procuring Customer Usage Data * Suggestions to Streamline Data Collection Processes * Overview of Data Reporting Requirements * Q&A Guidelines for Retrieving Customer Usage Data from Utilities * Questions and discussion after presentation

151

Semiannual progress report for the Idaho Geothermal Program, October 1, 1979-March 31, 1980  

DOE Green Energy (OSTI)

Progress is reported for the Idaho Geothermal program between October 1, 1979 and March 31, 1980. Progress on the 5-MW Pilot Power Plant at the Raft River Geothermal Test Site is summarized including construction, steady-state and transient analyses by computer modeling, the geothermal water treatment program, and additional experimental and theoretical work on direct contact heat exchangers. Asbestos-cement pipe failures in the geothermal fluid supply and injection system are also summarized. The successful automatic control-mode testing of the Prototype Power Plant is reported. A continuing direct applications experiment in aquaculture is outlined, and a proposal to study various ramifications of irrigating agricultural and range lands with spent geothermal fluid is described briefly. Also outlined is the second experimental hydraulic fracture treatment of a geothermal well at Raft River as part of the National Well Stimulation Program. The improvements to the Raft River site facilities are described, and progress in providing technical information and assistance in the Outreach, or User Assistance program presented. Also presented is a new DOE program, the User Coupled Confirmation Drilling Program, which is intended to reduce the financial risk of hydrothermal reservoir exploration by the private sector. Progress reports are also included on DOE's Program Opportunity Notice (PON) Program demonstration projects and Program Research and Development Announcement (PRDA) Program study projects.

Ihrig, R.R. (ed.)

1980-07-01T23:59:59.000Z

152

Geothermal direct heat applications program summary  

DOE Green Energy (OSTI)

In 1978, the Department of Energy Division of Geothermal and Hydropower Technologies initiated a program to accelerate the direct use of geothermal energy, in which 23 projects were selected. The projects, all in the western part of the US, cover the use of geothermal energy for space conditioning (heating and cooling) and agriculture (aquaculture and greenhouses). Initially, two projects were slated for industrial processing; however, because of lack of geothermal resources, these projects were terminated. Of the 23 projects, seven were successfully completed, ten are scheduled for completion by the end of 1983, and six were terminated for lack of resources. Each of the projects is being documented from its inception through planning, drilling, and resource confirmation, design, construction, and one year of monitoring. The information is being collected, evaluated, and will be reported. Several reports will be produced, including detailed topical reports on economics, institutional and regulatory problems, engineering, and a summary final report. To monitor progress and provide a forum for exchange of information while the program is progressing, semiannual or annual review meetings have been held with all project directors and lead engineers for the past four years. This is the sixth meeting in that series. Several of the projects which have been terminated are not included this year. Overall, the program has been very successful. Valuable information has been gathered. problems have been encountered and resolved concerning technical, regulatory, and institutional constraints. Most projects have been proven to be economical with acceptable pay-back periods. Although some technical problems have emerged, they were resolved with existing off-the-shelf technologies and equipment. The risks involved in drilling for the resource, the regulatory constraints, the high cost of finance, and large front-end cost remain the key obstacles to the broad development of geothermal direct use applications.

None

1982-08-01T23:59:59.000Z

153

The National Geothermal Collaborative, EERE-Geothermal Program, Final Report  

SciTech Connect

Summary of the work conducted by the National Geothermal Collaborative (a consensus organization) to identify impediments to geothermal development and catalyze events and dialogues among stakeholders to over those impediments.

Jody Erikson

2006-05-26T23:59:59.000Z

154

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

SciTech Connect

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

1976-04-01T23:59:59.000Z

155

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

DOE Green Energy (OSTI)

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

Not Available

1976-04-01T23:59:59.000Z

156

NREL: Energy Analysis - Geothermal Technology Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Integration Energy Analysis Search More Search Options Site Map Printable Version Geothermal Technology Analysis The Department of Energy's (DOE) Geothermal Energy Program...

157

Phase I Report U.S. DOE GRED II Program | Open Energy Information  

Open Energy Info (EERE)

Phase I Report U.S. DOE GRED II Program Phase I Report U.S. DOE GRED II Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Phase I Report U.S. DOE GRED II Program Abstract Noramex Corporation Inc, a Nevada company, owns a 100% interest in geothermal leases at the Blue Mountain Geothermal Area, Humboldt County, Nevada. The company is exploring the site for a geothermal resource suitable for development for electric power generation or In the spring of 2002, Noramex drilled the first geothermal observation hole at Blue Mountain, under a cost-share program with the U.S Department of Energy (DOE), under the DOE's Geothermal Exploration and Resource Definition (GRED) program, (Cooperative Agreement No. DE-FC04-00AL66972). DEEP BLUE No.1 was drilled to a total depth of 672.1 meters (2205 feet) and recorded

158

NANA Geothermal Assessment Program Final Report  

Science Conference Proceedings (OSTI)

In 2008, NANA Regional Corporation (NRC) assessed geothermal energy potential in the NANA region for both heat and/or electricity production. The Geothermal Assessment Project (GAP) was a systematic process that looked at community resources and the community's capacity and desire to develop these resources. In October 2007, the US Department of Energy's Tribal Energy Program awarded grant DE-FG36-07GO17075 to NRC for the GAP studies. Two moderately remote sites in the NANA region were judged to have the most potential for geothermal development: (1) Granite Mountain, about 40 miles south of Buckland, and (2) the Division Hot Springs area in the Purcell Mountains, about 40 miles south of Shungnak and Kobuk. Data were collected on-site at Granite Mountain Hot Springs in September 2009, and at Division Hot Springs in April 2010. Although both target geothermal areas could be further investigated with a variety of exploration techniques such as a remote sensing study, a soil geochemical study, or ground-based geophysical surveys, it was recommended that on-site or direct heat use development options are more attractive at this time, rather than investigations aimed more at electric power generation.

Jay Hermanson

2010-06-22T23:59:59.000Z

159

FY 1974 program plan for geothermal project  

SciTech Connect

The Program Plan specifies the basic plan for the utilization of FY-74 funds allocated by the AEC Division of Applied Technology and contributions from other participants for the development of geothermal energy in southern Idaho. Funding priorities are dictated by the Construction Data Package submission deadline and the October 1, 1974, site selection. Tasks not funded during FY-74 will be pursued during FY-75. (auth)

1974-02-05T23:59:59.000Z

160

Stanford Geothermal Program, reservoir and injection technology  

DOE Green Energy (OSTI)

This annual report of the Stanford Geothermal Program presents major projects in reservoir and injection technology. The four include: (1) an application of the boundary element method to front tracking and pressure transient testing; (2) determination of fracture aperture, a multi-tracer approach; (3) an analysis of tracer and thermal transients during reinjection; and, (4) pressure transient modeling of a non-uniformly fractured reservoir. (BN)

Horne, R.; Ramey, H.J. Jr.; Miller, F.G.; Brigham, W.E.; Kruger, P.

1988-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE Hydrogen Program Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and Fuel Cells and Fuel Cells Mark Paster U.S. Department of Energy Hydrogen, Fuel Cells and Infrastructure Program January, 2005 A Bold New Approach is Required 0 4 8 12 16 20 24 28 32 1970 1980 1990 2000 2010 2020 2030 2040 2050 Petroleum (MMB/Day Oil Equivalent) Actual Projection U.S. Oil Production EIA 2003 Base Case Extended Oil Consumption With Average Fuel Efficiency Automobile & Light Truck Oil Use U.S. Transportation Oil Consumption U.S. Refinery Capacity Source: DOE/EIA, International Petroleum Statistics Reports, April 1999; DOE/EIA 0520, International Energy Annual 1997, DOE/EIA0219(97), February 1999. 0 20 40 60 80 100 Rest of World OPEC US Percentage of Total Consumption Production Reserves 2% 12% 26% 7% 41% 77% 67% 47% 21% World Oil Reserves are Consolidating in OPEC Nations 0 10 20 30 40 50 60 70 80

162

DOE Technical Standards Program: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Safety Vision The culture of the DOE community will be based on standards. Technical standards will formally integrate part of all DOE facility, program and...

163

DOE/EA-1676: Final Environmental Assessment for Department of Energy Loan Guarantee for U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon (December 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76 76 FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment for DEPARTMENT OF ENERGY LOAN GUARANTEE FOR U.S. GEOTHERMAL'S NEAL HOT SPRINGS GEOTHERMAL FACILITY IN VALE, OREGON U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 December 2009 DOE/EA-1676 Environmental Assessment for Department of Energy Loan Guarantee for U.S Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon DOE/EA-1676 TABLE OF CONTENTS LIST OF ACRONYMS iii Executive Summary 1 1.0 PURPOSE AND NEED FOR AGENCY ACTION 2 2.0 PROPOSED ACTION AND ALTERNATIVES 2 2.1 Description of Proposed Action 4 2.2 Alternatives Considered but Eliminated 9 2.3 No Action Alternative 9 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL EFFECTS 10

164

Consolidated Research Program United States Gulf Coast Geopressured-Geothermal Program  

DOE Green Energy (OSTI)

The logging research program in the DOE Geopressured-Geothermal Energy Project was set up to (a) carry out research on logging problems important to the DOE program; (b) provide advice on logging programs in DOE wells; (c) monitor log quality during data acquisition; (d) provide log analyses as requested by DOE and (e) provide other services as skills and time permit. Funding for the project amounted to about $50,000/year from 1979 to 1985 (direct cost plus overhead). In 1986 DOE funding began to increase and was about $100,000 per year for the last three years of the project (1988-91). In addition to DOE funding, the Gas Research Institute Tight Gas Sands Project contributed to our boron research by about $7,000 per year during 1989-91, plus about $100,000 worth of core and log data from five tight gas sand wells in East and West Texas and in Wyoming.

Dunlap, Henry F.

1992-06-01T23:59:59.000Z

165

Past DOE Technical Standards Program Procedures | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Center DOE Technical Standards Program DOE Technical Standards Procedures Past DOE Technical Standards Program Procedures Past DOE Technical Standards Program...

166

Preliminary Technical Risk Analysis for the Geothermal Technologies Program  

DOE Green Energy (OSTI)

This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program ('the Program'). The analysis is a task by Princeton Energy Resources International, LLC (PERI), in support of the National Renewable Energy Laboratory (NREL) on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE). This requires both computational development (i.e., creating a spreadsheet-based analysis tool) and a synthesis of judgments by a panel of researchers and experts of the expected results of the Program's R&D.

McVeigh, J.; Cohen, J.; Vorum, M.; Porro, G.; Nix, G.

2007-03-01T23:59:59.000Z

167

Semiannual progress report for the Idaho Geothermal Program, April 1 to September 30, 1980  

DOE Green Energy (OSTI)

The completion of the 5-MW Pilot Power Plant at the Raft River Geothermal Test Site, modification of the similar, binary cycle Prototype Power Plant, and the water treatment program that studies environmentally safe ways to inhibit corrosion and scaling in geothermal power plants and investigates corrosion resistant materials are summarized. Studies of binary geothermal cycles using mixed hydrocarbon working fluids are described as part of the continuing search for ways to produce low-cost electricity from moderate-temperature geothermal fluids. Progress is reported on studies of direct contact heat exchanger concepts, heat rejection systems, and primary heat exchangers with augmentation. As part of the now-ended series of aquaculture experiments, an unsuccessful attempt to incubate common carp embryos in geothermal waters is reported. An experiment in revegetating disturbed land at Raft River is mentioned and progress on DOE's new User Coupled Confirmation Drilling Program is described. An estimate is presented of the amount of hydrothermal energy that could be produced by the year 2000, with and without Federal assistance, for electric generation and direct applications such as industrial process heat. Progress is reported on the Marketing Assistance Program, through which technical information and assistance is provided potential users and developers of geothermal resources. Also reported is progress in DOE's Program Opportunity Notice (PON) Program demonstration projects and Program Research and Development Announcement (PRDA) Program study projects.

Ihrig, R.R. (ed.)

1981-03-01T23:59:59.000Z

168

Semiannual progress report for the Idaho Geothermal Program, April 1 to September 30, 1980  

SciTech Connect

The completion of the 5-MW Pilot Power Plant at the Raft River Geothermal Test Site, modification of the similar, binary cycle Prototype Power Plant, and the water treatment program that studies environmentally safe ways to inhibit corrosion and scaling in geothermal power plants and investigates corrosion resistant materials are summarized. Studies of binary geothermal cycles using mixed hydrocarbon working fluids are described as part of the continuing search for ways to produce low-cost electricity from moderate-temperature geothermal fluids. Progress is reported on studies of direct contact heat exchanger concepts, heat rejection systems, and primary heat exchangers with augmentation. As part of the now-ended series of aquaculture experiments, an unsuccessful attempt to incubate common carp embryos in geothermal waters is reported. An experiment in revegetating disturbed land at Raft River is mentioned and progress on DOE's new User Coupled Confirmation Drilling Program is described. An estimate is presented of the amount of hydrothermal energy that could be produced by the year 2000, with and without Federal assistance, for electric generation and direct applications such as industrial process heat. Progress is reported on the Marketing Assistance Program, through which technical information and assistance is provided potential users and developers of geothermal resources. Also reported is progress in DOE's Program Opportunity Notice (PON) Program demonstration projects and Program Research and Development Announcement (PRDA) Program study projects.

Ihrig, R.R. (ed.)

1981-03-01T23:59:59.000Z

169

NREL: Geothermal Technologies - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications NREL's geothermal team develops publications, including technical reports and conference papers, about geothermal resource assessments, market and policy analysis, and geothermal research and development (R&D) activities. In addition to the selected documents available below, you can find resources on the U.S. Department of Energy (DOE) Geothermal Technologies Program Web site or search the NREL Publications Database. For additional geothermal documents, including those published since 1970, please visit the Office of Science and Technology Information Geothermal Legacy Collection. Policymakers' Guidebooks Five steps to effective policy. Geothermal Applications Market and Policy Analysis Program Activities R&D Activities Geothermal Applications

170

Beowawe Geothermal Area evaluation program. Final report  

DOE Green Energy (OSTI)

Several exploration programs were conducted at the Beowawe Geothermal Prospect, Lander and Eureka County, Nevada. Part I, consisting of a shallow temperature hole program, a mercury soil sampling survey, and a self-potential survey were conducted in order to select the optimum site for an exploratory well. Part II consisted of drilling a 5927-foot exploratory well, running geophysical logs, conducting a drill stem test (2937-3208 feet), and a short-term (3-day) flow test (1655-2188 feet). All basic data collected is summarized.

Iovenitti, J. L

1981-03-01T23:59:59.000Z

171

Geothermal Program Review XV: proceedings. Role of Research in the Changing World of Energy Supply  

SciTech Connect

The U.S. Department of Energy`s Office of Geothermal Technologies conducted its annual Program Review XV in Berkeley, March 24-26, 1997. The geothermal community came together for an in-depth review of the federally-sponsored geothermal research and development program. This year`s theme focussed on {open_quotes}The Role of Research in the Changing World of Energy Supply.{close_quotes} This annual conference is designed to promote technology transfer by bringing together DOE-sponsored researchers; utility representatives; geothermal developers; equipment and service suppliers; representatives from local, state, and federal agencies; and others with an interest in geothermal energy. Separate abstracts have been indexed to the database for contributions to this conference.

1997-01-01T23:59:59.000Z

172

Geothermal energy program summary: Volume 2, Research summaries, fiscal year 1988  

SciTech Connect

The Geothermal Technology Division (GTD) of the US Department of Energy (DOE) is charged with the lead federal role in the research and development (R&D) of technologies that will assist industry in economically exploiting the nation`s vast geothermal resources. The GTD R&D program represents a comprehensive, balanced approach to establishing all forms of geothermal energy as significant contributors to the nation`s energy supply. It is structured both to maintain momentum in the growth of the existing hydrothermal industry and to develop long-term options offering the greatest promise for practical applications. The Geothermal Energy Program Summary for Fiscal Year 1988 is a two-volume set designed to be an easily accessible reference to inform the US geothermal industry and other interested parties of the technological advances and progress achieved in the DOE geothermal program as well as to describe the thrust of the current R&D effort and future R&D directions. This volume, Volume II, contains a detailed compilation of each GTD-funded R&D activity performed by national laboratories or under contract to industrial, academic, and nonprofit research institutions. The Program Summary is intended as an important technology transfer vehicle to assure the wide and timely dissemination of information concerning the department`s geothermal research.

1989-03-01T23:59:59.000Z

173

Program predicts reservoir temperature and geothermal gradient  

Science Conference Proceedings (OSTI)

This paper reports that a Fortran computer program has been developed to determine static formation temperatures (SFT) and geothermal gradient (GG). A minimum of input data (only two shut-in temperature logs) is required to obtain the values of SFT and GG. Modeling of primary oil production and designing enhanced oil recovery (EOR) projects requires knowing the undisturbed (static) reservoir temperature. Furthermore, the bottom hole circulating temperature (BHCT) is an important factor affecting a cement's thickening time, rheological properties, compressive strength, development, and set time. To estimate the values of BHCT, the geothermal gradient should be determined with accuracy. Recently we obtained an approximate analytical solution which describes the shut-in temperature behavior.

Kutasov, I.M.

1992-06-01T23:59:59.000Z

174

Geothermal Technologies Program 2010 Peer Review | Open Energy...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Geothermal Technologies Program 2010 Peer Review Citation Joe Iovenitti....

175

Geothermal-subsidence research program plan and review  

DOE Green Energy (OSTI)

The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

1980-09-01T23:59:59.000Z

176

DOE-Loan Programs Office  

NLE Websites -- All DOE Office Websites

Annual Cars off the Road* 29,100 Annual Households Equivalent 1705 (FIPP) Nevada Geothermal Power Company, Inc. (Blue Mountain) Geothermal Geothermal Reno, NV 98.5 million...

177

Navy's Geothermal Program Office: Overview of Recovery Act (ARRA) Funded  

Open Energy Info (EERE)

Navy's Geothermal Program Office: Overview of Recovery Act (ARRA) Funded Navy's Geothermal Program Office: Overview of Recovery Act (ARRA) Funded Exploration in CA and NV and other Exploration Projects Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Navy's Geothermal Program Office: Overview of Recovery Act (ARRA) Funded Exploration in CA and NV and other Exploration Projects Details Activities (9) Areas (6) Regions (0) Abstract: The Navy's Geothermal Program Office (GPO) manages, explores for and supports the development of geothermal resources on Department of Defense (DoD) -managed lands. We are currently conducting exploration in 13 sites or regions on 6 military installations in Nevada and California. We also have tentative plans to expand our activities late this year or early next year into Utah as well as Guam and the Republic of Djibouti, northeast

178

Geothermal Heat Pump Grant Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geothermal Heat Pump Grant Program Geothermal Heat Pump Grant Program Geothermal Heat Pump Grant Program < Back Eligibility Commercial Industrial Institutional Local Government Nonprofit Residential Schools Maximum Rebate Residential: $3,000 Non-residential: $4,500 Program Info Funding Source Strategic Energy Investment Fund (SEIF) Start Date 2007 State Maryland Program Type State Rebate Program Rebate Amount Residential: $3,000 per project Non-residential: $90-$180 per ton (varies by system size) Provider Maryland Energy Administration The Maryland Energy Administration (MEA) offers rebates of $3,000 for residential geothermal heat pump systems and up to $4,500 for non-residential geothermal heat pump systems. The residential program offers a flat per system incentive ($3,000) for systems with up to 10 tons

179

DOE Matching Grant Program  

SciTech Connect

Funding used to support a portion of the Nuclear Engineering Educational Activities. Upgrade of teaching labs, student support to attend professional conferences, salary support for graduate students. The US Department of Energy (DOE) has funded Purdue University School of Nuclear Engineering during the period of five academic years covered in this report starting in the academic year 1996-97 and ending in the academic year 2000-2001. The total amount of funding for the grant received from DOE is $416K. In the 1990's, Nuclear Engineering Education in the US experienced a significant slow down. Student enrollment, research support, number of degrees at all levels (BS, MS, and PhD), number of accredited programs, University Research and Training Reactors, all went through a decline to alarmingly low levels. Several departments closed down, while some were amalgamated with other academic units (Mechanical Engineering, Chemical Engineering, etc). The School of Nuclear Engineering at Purdue University faced a major challenge when in the mid 90's our total undergraduate enrollment for the Sophomore, Junior and Senior Years dropped in the low 30's. The DOE Matching Grant program greatly strengthened Purdue's commitment to the Nuclear Engineering discipline and has helped to dramatically improve our undergraduate and graduate enrollment, attract new faculty and raise the School of Nuclear Engineering status within the University and in the National scene (our undergraduate enrollment has actually tripled and stands at an all time high of over 90 students; total enrollment currently exceeds 110 students). In this final technical report we outline and summarize how the grant was expended at Purdue University.

Tsoukalas, L.

2002-12-31T23:59:59.000Z

180

Semiannual progress report for the Idaho Geothermal Program, April 1-September 30, 1979  

DOE Green Energy (OSTI)

Progress made by the Idaho Geothermal Program between March 31 and September 30, 1979 is discussed. Geothermal well tests at the Raft River geothermal site, facility construction, and the first hydraulic fracture treatment of a geothermal well are summarized. The results of direct applications experiments are described briefly, including experiments in aquaculture, agriculture, fluidized bed space heating, fluidized bed food drying, essential oil extraction, and geothermal assisted conversion of biomass to ethanol. Improvements to the binary cycle prototype power plant at Raft River, construction progress on the 5-MW pilot plant, and experimental work on direct contact heat exchangers are discussed. Also outlined is progress on environmental studies at Raft River, including a brief discussion of socioeconomic impacts of geothermal development on Cassia County, Idaho. Results are presented of a 48-industry survey conducted to determine industry's views of the technology barriers to accelerating hydrothermal energy commercialization. A projection summarizes the capital and manpower needed through 1987 to place 6800 MW of direct applications development online. Progress reports are also included on DOE's Program Opportunity Notice (PON) Program demonstration projects and DOE's Program Research and Development Announcement (PRDA) Program study projects.

Ihrig, R.R.

1980-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Geothermal Energy R&D Program Annual Progress Report Fiscal Year 1993  

DOE Green Energy (OSTI)

In this report, the DOE Geothermal Program activities were split between Core Research and Industrial Development. The technical areas covered are: Exploration Technology, Drilling Technology, Reservoir Technology (including Hot Dry Rock Research and The Geyser Cooperation), and Conversion Technology (power plants, materials, and direct use/direct heat). Work to design the Lake County effluent pipeline to help recharge The Geysers shows up here for the first time. This Progress Report is another of the documents that are reasonable starting points in understanding many of the details of the DOE Geothermal Program. (DJE 2005)

None

1994-04-01T23:59:59.000Z

182

Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Program Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Program < Back Eligibility Agricultural Commercial Industrial Residential Maximum Rebate 1,000/ton Program Info Funding Source American Recovery and Reinvestment Act of 2009 State Oklahoma Program Type Utility Rebate Program Rebate Amount $800 - $1,000/ton Provider Oklahoma Municipal Power Authority Program funds currently exhausted, additional funds have been requested. Visit the program website for the most up to date information on fund availability and to register for the waiting list for this program. The Oklahoma Municipal Power Authority (OMPA) and the Oklahoma Department of Commerce currently offer the Oklahoma Comfort Program for geothermal

183

Geothermal R&D Program FY 1988 Project Summaries  

SciTech Connect

This report summarizes DOE Geothermal R&D subprograms, major tasks, and projects. Contract funding amounts are shown. Many summaries have references (citations) to the researchers' previous related work. These can be useful. Geothermal budget actual amounts are shown for FY 1984 -1988. (DJE 2005)

1988-10-01T23:59:59.000Z

184

Geothermal R&D Program FY 1988 Project Summaries  

SciTech Connect

This report summarizes DOE Geothermal R&D subprograms, major tasks, and projects. Contract funding amounts are shown. Many summaries have references (citations) to the researchers' previous related work. These can be useful. Geothermal budget actual amounts are shown for FY 1984 -1988. (DJE 2005)

None

1988-10-01T23:59:59.000Z

185

DOE Technical Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision: 4 Date: August 1, 2000 TECHNICAL STANDARDS PROGRAM RESPONSIBILITIES U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-1 Responsibilities Revision: 4 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1 2. PROGRAM RESPONSIBILITIES ................................................................................................... 1

186

Summary of Comments on DOE-Industry Cooperation by Geothermal Industry Panel  

DOE Green Energy (OSTI)

The geothermal industry has matured significantly in recent years, going from early stages of prospect identification and exploration, through drilling and resource assessment, field development and power plant construction, and finally to the operation of mature geothermal fields. All of this has been done within the space of a brief quarter century. Probably no other resource industry in modem times has seen the dramatic growth and maturation as has the geothermal industry. Certainly there has been no comparable speed of development and maturation in, for example, the biomass or solar or wind or photovoltaic resource industries. And nuclear, despite double the number of decades of research and development, and infinitely greater cash outlay, is still sinking under unresolved problems of public health and safety. The enormous and rapid geothermal growth, resulting in the installation and operation of some 2,800 MW of power generation facilities, plus perhaps 2,000 thermal MW of nonelectric facilities, all within the past 25 years, has left unresolved issues in its wake. This has been unavoidable: any new and immensely successful technology inevitably pushes forward so fast on so many fronts that there is not a smooth or complete coverage of all points of importance. The Department of Energy, through its Geothermal Program, has helped the growing geothermal industry in many ways. And this has not been give-aways: the DOE geothermal dollars have enables a reliable, safe, environmentally acceptable technology to come on-line for Americans at an acceptable price at a time when energy has been needed. This is an indigenous, jobs creating, imports-reducing industry. Exports of American geothermal goods and services are being seen all across the world. However, because we are in many ways a highly mature industry, with commercial equity- and debt-financing for typical development projects, and with new interest being expressed by electric utilities in additional geothermal power facilities, we are caught in a ''Catch 22'' that is deeply troubling. We are congratulated--and then ignored--by government officials, and told to move forward ,on our own feet; while at the same time, financiers and electric utilities tell us that for there to be more geothermal development, we must resolve the unresolved issues: better predictive exploration, greater drilling success rates, more accurate reserves assessments, problem-free field operations, lower development costs, improved methodology for risk reduction.

Koening, James B.

1992-01-01T23:59:59.000Z

187

Summary of Comments on DOE-Industry Cooperation by Geothermal Industry Panel  

SciTech Connect

The geothermal industry has matured significantly in recent years, going from early stages of prospect identification and exploration, through drilling and resource assessment, field development and power plant construction, and finally to the operation of mature geothermal fields. All of this has been done within the space of a brief quarter century. Probably no other resource industry in modem times has seen the dramatic growth and maturation as has the geothermal industry. Certainly there has been no comparable speed of development and maturation in, for example, the biomass or solar or wind or photovoltaic resource industries. And nuclear, despite double the number of decades of research and development, and infinitely greater cash outlay, is still sinking under unresolved problems of public health and safety. The enormous and rapid geothermal growth, resulting in the installation and operation of some 2,800 MW of power generation facilities, plus perhaps 2,000 thermal MW of nonelectric facilities, all within the past 25 years, has left unresolved issues in its wake. This has been unavoidable: any new and immensely successful technology inevitably pushes forward so fast on so many fronts that there is not a smooth or complete coverage of all points of importance. The Department of Energy, through its Geothermal Program, has helped the growing geothermal industry in many ways. And this has not been give-aways: the DOE geothermal dollars have enables a reliable, safe, environmentally acceptable technology to come on-line for Americans at an acceptable price at a time when energy has been needed. This is an indigenous, jobs creating, imports-reducing industry. Exports of American geothermal goods and services are being seen all across the world. However, because we are in many ways a highly mature industry, with commercial equity- and debt-financing for typical development projects, and with new interest being expressed by electric utilities in additional geothermal power facilities, we are caught in a ''Catch 22'' that is deeply troubling. We are congratulated--and then ignored--by government officials, and told to move forward ,on our own feet; while at the same time, financiers and electric utilities tell us that for there to be more geothermal development, we must resolve the unresolved issues: better predictive exploration, greater drilling success rates, more accurate reserves assessments, problem-free field operations, lower development costs, improved methodology for risk reduction.

Koening, James B.

1992-01-01T23:59:59.000Z

188

Enhanced Geothermal Systems (EGS) R&D Program  

DOE Green Energy (OSTI)

The purpose of this workshop was to develop technical background facts necessary for planning continued research and development of Enhanced Geothermal Systems (EGS). EGS are geothermal reservoirs that require improvement of their permeability or fluid contents in order to achieve economic energy production. The initial focus of this R&D program is devising and testing means to extract additional economic energy from marginal volumes of hydrothermal reservoirs that are already producing commercial energy. By mid-1999, the evolution of the EGS R&D Program, begun in FY 1988 by the U.S. Department of Energy (DOE), reached the stage where considerable expertise had to be brought to bear on what technical goals should be pursued. The main purpose of this Workshop was to do that. The Workshop was sponsored by the Office of Geothermal Technologies of the Department of Energy. Its purpose and timing were endorsed by the EGS National Coordinating Committee, through which the EGS R&D Program receives guidance from members of the U.S. geothermal industry. Section 1.0 of this report documents the EGS R&D Program Review Session. There, managers and researchers described the goals and activities of the program. Recent experience with injection at The Geysers and analysis of downhole conditions at Dixie Valley highlighted this session. Section 2.0 contains a number of technical presentations that were invited or volunteered to illuminate important technical and economic facts and opportunities for research. The emphasis here was on fi.acture creation, detection, and analysis. Section 3.0 documents the initial general discussions of the participants. Important topics that emerged were: Specificity of defined projects, Optimizing cost effectiveness, Main technical areas to work on, Overlaps between EGS and Reservoir Technology R&D areas, Relationship of microseismic events to hydraulic fractures, and Defining criteria for prioritizing research thrusts. Sections 4.0 and 5.0 report the meat of the Workshop. Section 4.0 describes the nomination and clarification of technical thrusts, and Section 5.0 reports the results of prioritizing those thrusts via voting by the participants. Section 6.0 contains two discussions conducted after the work on research thrusts. The topics were ''Simulation'' and ''Stimulation''. A number of technical points that emerged here provide important guidance for both practical field work on EGS systems and for research.

Entingh, Daniel J.

1999-08-18T23:59:59.000Z

189

Pressure Temperature Log At Mccoy Geothermal Area (DOE GTP) | Open Energy  

Open Energy Info (EERE)

Pressure Temperature Log At Mccoy Geothermal Area (DOE GTP) Pressure Temperature Log At Mccoy Geothermal Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Pressure Temperature Log At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Pressure Temperature Log Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Pressure_Temperature_Log_At_Mccoy_Geothermal_Area_(DOE_GTP)&oldid=511052" Categories: Exploration Activities DOE Funded Activities ARRA Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

190

DOE`s Advanced Turbine Systems Program  

Science Conference Proceedings (OSTI)

This paper discusses the Advanced Turbine Systems (ATS) Program, which is necessary to achieve METC`s vision for future IGCC systems. This major new program is a cooperative effort in which DOE`s Office of Fossil Energy (FE) and Office of Conservation and Renewable Energy (CE) are joining forces with the private sector to develop ultra-high efficiency gas turbine systems. A goal of this Program is to have a utility-size gas turbine with a 60 percent efficiency (lower heating value basis (LHV)) ready for commercialization by the year 2002. (While this paper focuses on utility-size turbines which are the primary interest of this audience, an ultra-high efficiency, industrial-size gas turbine will also be developed in the ATS Program with a comparable improvement in efficiency.) Natural gas is the target fuel of the Program, a recognition by DOE that natural gas will play a significant role in supplying future power generation needs in the US. However, to insure that the US has fuel supply options, ATS designs will be adaptable to coal and biomass fuels. Therefore, the ATS Program will directly benefit IGCC and other advanced coal based power generation systems. Cost and efficiency improvements in the turbine system as well as in the gasification and gas stream cleanup plant sections will enable IGCC to reach a cost target of $1,000--$1,280/kW and an efficiency goal of 52 percent (higher heating value basis (HHV)) in the post-2000 market.

Bechtel, T.F.; Bajura, R.A.; Salvador, L.A.

1993-03-01T23:59:59.000Z

191

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

1995-03-03T23:59:59.000Z

192

Geothermal Energy Multi-Year Program Plan, FY 1994-1998  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

1993-04-01T23:59:59.000Z

193

Geothermal policy development program: expediting the local geothermal permitting process  

DOE Green Energy (OSTI)

For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

Not Available

1981-07-01T23:59:59.000Z

194

Geothermal project summaries. Geothermal energy research, development and demonstration program  

DOE Green Energy (OSTI)

Summaries of all Division of Geothermal Energy supported projects for which contracts have been executed are compiled. Each summary includes pertinent statistical data for that project and an abstract summarizing the project plans and accomplishments. The projects summarized fall into six categories: engineering research and development, resource exploration and assessment, hydrothermal technology applications, advanced technology applications, utilization experiments, and environmental control and institutional studies. (MHR)

Not Available

1976-09-01T23:59:59.000Z

195

DOE Technical Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Revision: 4 Date: August 1, 2000 CONVERSION OF DOE TECHNICAL STANDARDS TO NON-GOVERNMENT STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-10 Conversion Revision: 4 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1 2. CONVERSION OF DOE TECHNICAL STANDARDS.................................................................... 1

196

DOE Technical Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Revision: 4 Date: August 1, 2000 APPROVING AND ISSUING DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-8 Approval Revision: 4 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1 2. APPROVING AND ISSUING DOE TECHNICAL STANDARDS .................................................... 1

197

Salt Wells Geothermal Exploratory Drilling Program EA(DOI-BLM...  

Open Energy Info (EERE)

09142009 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Salt Wells Geothermal Exploratory Drilling Program EA (DOI-BLM-NV-C010-2009-...

198

DOE Carbon Sequestration Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Sequestration Program Charles E. Schmidt Carbon Sequestration Product Manager National Energy Technology Laboratory David J. Beecy Director, Office of Environmental Systems...

199

Community Geothermal Technology Program: Electrodeposition of minerals in geothermal brine  

DOE Green Energy (OSTI)

Objective was to study the materials electrodeposited from geothermal brine, from the HGP-A well in Puna, Hawaii. Due to limitations, only one good set of electrodeposited material was obtained; crystallography indicates that vaterite forms first, followed by calcite and then perhaps aragonite as current density is increased. While the cost to weight ratio is reasonable, the deposition rate is very slow. More research is needed, such as reducing the brittleness. The electrodeposited material possibly could be used as building blocks, tables, benches, etc. 49 figs, 4 tabs, 7 refs.

Not Available

1990-12-31T23:59:59.000Z

200

Geothermal Loan Guaranty Program and its impact on geothermal exploration and development  

DOE Green Energy (OSTI)

The study showed that the Geothermal Loan Guaranty Program has had only a negligible effect on geothermal development and the response to the program was far less than expected. The streamlining of environmental regulations and leasing policies, and the granting of intangible drilling cost write-offs and depletion allowances to operators would have had a greater impact on geothermal energy development. The loan guaranty program did not promote the undertaking of any new projects that would not have been undertaken without it. The program only accelerated the pace for some development which might have commenced in the future. Included in the study are recommendations for improving the operation of the program thereby increasing its attractiveness to potential applicants.

Nasr, L.H.

1978-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ORISE: DOE EERE National Geothermal Student Competition photo gallery  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy Office of Energy Efficiency and Renewable Energy U.S. Department of Energy Office of Energy Efficiency and Renewable Energy National Geothermal Student Competition photo gallery Check out images of the winners of the 2010-2011 National Geothermal Student Competition. Eleven teams were selected and each team received $10,000 to conduct their assessment of the Rio Grande Rift. Photos courtesy of the National Renewable Energy Laboratory (NREL). National Geothermal Student Competition photo National Geothermal Student Competition photo National Geothermal Student Competition photo National Geothermal Student Competition photo National Geothermal Student Competition photo National Geothermal Student Competition photo National Geothermal Student Competition photo National Geothermal Student Competition photo

202

Geothermal Program Review XI: proceedings. Geothermal Energy - The Environmental Responsible Energy Technology for the Nineties  

DOE Green Energy (OSTI)

These proceedings contain papers pertaining to current research and development of geothermal energy in the USA. The seven sections of the document are: Overview, The Geysers, Exploration and Reservoir Characterization, Drilling, Energy Conversion, Advanced Systems, and Potpourri. The Overview presents current DOE energy policy and industry perspectives. Reservoir studies, injection, and seismic monitoring are reported for the geysers geothermal field. Aspects of geology, geochemistry and models of geothermal exploration are described. The Drilling section contains information on lost circulation, memory logging tools, and slim-hole drilling. Topics considered in energy conversion are efforts at NREL, condensation on turbines and geothermal materials. Advanced Systems include hot dry rock studies and Fenton Hill flow testing. The Potpourri section concludes the proceedings with reports on low-temperature resources, market analysis, brines, waste treatment biotechnology, and Bonneville Power Administration activities. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

Not Available

1993-10-01T23:59:59.000Z

203

DOE Seeks to Invest up to $90 Million in Advanced Geothermal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agencies You are here Home DOE Seeks to Invest up to 90 Million in Advanced Geothermal Energy Technology and Research DOE Seeks to Invest up to 90 Million in Advanced...

204

Federal Geothermal Research Program Update Fiscal Year 2000  

DOE Green Energy (OSTI)

The Department of Energy's Geothermal Program serves two broad purposes: (1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and (2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

Renner, J.L.

2001-08-15T23:59:59.000Z

205

Hot Dry Rock Geothermal Energy Development Program  

DOE Green Energy (OSTI)

The overall objective of the Hot Dry Rock (HDR) Geothermal Energy Development Program is to determine the technical and economic feasibility of HDR as a significant energy source and to provide a basis for its timely commercial development. Principal operational tasks are those activities required to enable a decision to be made by FY86 on the ultimate commercialization of HDR. These include development and analyis of a 20- to 50-MW Phase II HDR reservoir at Site 1 (Fenton Hill) with the potential construction of a pilot electric generating station, Phase III; selection of a second site with subsequent reservoir development and possible construction of a direct heat utilization pilot plant of at least 30 MW thermal thereon; the determination of the overall domestic HDR energy potential; and the evaluation of 10 or more target prospect areas for future HDR plant development by commercial developers. Phase I of the Los Alamos Scientific Laboratory's Fenton Hill project was completed. Phase I evaluated a small subterranean system comprised of two boreholes connected at a depth of 3 km by hydraulic fracturing. A closed-loop surface system has been constructed and tests involving round-the-clock operation have yielded promising data on heat extraction, geofluid chemistry, flow impedance, and loss of water through the underground reservoir between the two holes, leading to cautions optimism for the future prospects of private-sector HDR power plants. (MHR)

Franke, P.R.

1979-01-01T23:59:59.000Z

206

Hot Dry Rock Geothermal Energy Development Program  

DOE Green Energy (OSTI)

During Fiscal Year 1987, emphasis in the Hot Dry Rock Geothermal Energy Development Program was on preparations for a Long-Term Flow Test'' of the Phase II'' or Engineering'' hot dry rock energy system at Fenton Hill, New Mexico. A successful 30-day flow test of the system during FY86 indicated that such a system would produce heat at a temperature and rate that could support operation of a commercial electrical power plant. However, it did not answer certain questions basic to the economics of long-term operation, including the rate of depletion of the thermal reservoir, the rate of water loss from the system, and the possibility of operating problems during extended continuous operation. Preparations for a one-year flow test of the system to answer these and more fundamental questions concerning hot dry rock systems were made in FY87: design of the required surface facilities; procurement and installation of some of their components; development and testing of slimline logging tools for use through small-diameter production tubing; research on temperature-sensitive reactive chemical tracers to monitor thermal depletion of the reservoir; and computer simulations of the 30-day test, extended to modeling the planned Long-Term Flow Test. 45 refs., 34 figs., 5 tabs.

Smith, M.C.; Hendron, R.H.; Murphy, H.D.; Wilson, M.G.

1989-12-01T23:59:59.000Z

207

Geothermal Reservoir Well Stimulation Program: technology transfer  

DOE Green Energy (OSTI)

A literature search on reservoir and/or well stimulation techniques suitable for application in geothermal fields is presented. The literature on stimulation techniques in oil and gas field applications was also searched and evaluated as to its relevancy to geothermal operations. The equivalent low-temperature work documented in the open literature is cited, and an attempt is made to evaluate the relevance of this information as far as high-temperature stimulation work is concerned. Clays play an important role in any stimulation work. Therefore, special emphasis has been placed on clay behavior anticipated in geothermal operations. (MHR)

Not Available

1980-05-01T23:59:59.000Z

208

DOE Building Technologies Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview Overview September 2013 Buildings.energy.gov/BPD BuildingsPerformanceDatabase@ee.doe.gov 2 * The BPD statistically analyzes trends in the energy performance and physical & operational characteristics of real commercial and residential buildings. The Buildings Performance Database 3 Design Principles * The BPD contains actual data on existing buildings - not modeled data or anecdotal evidence. * The BPD enables statistical analysis without revealing information about individual buildings. * The BPD cleanses and validates data from many sources and translates it into a standard format. * In addition to the BPD's analysis tools, third parties will be able to create applications using the

209

Penn State DOE GATE Program  

DOE Green Energy (OSTI)

The Graduate Automotive Technology Education (GATE) Program at The Pennsylvania State University (Penn State) was established in October 1998 pursuant to an award from the U.S. Department of Energy (U.S. DOE). The focus area of the Penn State GATE Program is advanced energy storage systems for electric and hybrid vehicles.

Anstrom, Joel

2012-08-31T23:59:59.000Z

210

New Mexico statewide geothermal energy program. Final technical report  

DOE Green Energy (OSTI)

This report summarizes the results of geothermal energy resource assessment work conducted by the New Mexico Statewide Geothermal Energy Program during the period September 7, 1984, through February 29, 1988, under the sponsorship of the US Dept. of Energy and the State of New Mexico Research and Development Institute. The research program was administered by the New Mexico Research and Development Institute and was conducted by professional staff members at New Mexico State University and Lightning Dock Geothermal, Inc. The report is divided into four chapters, which correspond to the principal tasks delineated in the above grant. This work extends the knowledge of the geothermal energy resource base in southern New Mexico with the potential for commercial applications.

Icerman, L.; Parker, S.K. (ed.)

1988-04-01T23:59:59.000Z

211

DOE Superconductivity Program Stakeholders | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stakeholders Map showing the stakeholders involved in High Temperature Superconductivity work with the DOE. DOE Superconductivity Program Stakeholders More Documents &...

212

Overview of the Geothermal Energy Program Review X: Geothermal Energy and the Utility Market - The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market  

DOE Green Energy (OSTI)

This overview at the Geothermal Program Review X: Geothermal Energy and the Utility Market consisted of five presentations: ''Technology Advancements to Support Growth in Geothermal Power Sales in a Dynamic Utility Market'' by John E. Mock; ''Geothermal Energy Market in Southern California: Past, Present and Future'' by Vikram Budraja; ''Taking the High Ground: Geothermal's Place in the Revolving Energy Market'' by Richard Jaros; ''Recent Developments in Japan's Hot Dry Rock Program'' by Tsutomu Yamaguchi; and ''Options in the Eleventh Year for Interim Standard Offer Number Four Contracts'' by Thomas C. Hinrichs.

Mock, John E.; Budraja, Vikram; Jaros, Richard; Yamaguchi, Tsutomu; Hinrichs, Thomas C.

1992-01-01T23:59:59.000Z

213

Semiannual progress report for the Idaho Geothermal Program, April 1-September 30, 1981  

DOE Green Energy (OSTI)

Modifications incorporated in the 5-MW Pilot Power Plant at Raft River Geothermal Test Site, system operational testing and maintenance activities at that plant, and the water treatment program's corrosion studies are summarized. Progress is reported on performance tests of the ORNL condenser and the direct-contact heat exchanger in the Prototype Power Plant. Production-injection tests associated with pump installation in monitor wells at Raft River are reported. Case studies conducted and publications prepared for the program of low-to moderate-temperature hydrothermal resource development are also reported. Monitoring activities and studies of the environmental program at Raft River are described and two new areas of research under the Environmental Support Injection Research Program: pressure monitoring, and dispersion studies. Progress of three successful proposers under the User-Coupled Confirmation Drilling Program is summarized. A program to encourage use of geothermal energy at Federal facilities was developed and initiated. Investigation of direct use of hydrothermal energy is reported. Progress is reported on the marketing Assistance Program, through which technical information and assistance are provided to potential users and developers of geothermal resources. Also reported is progress on DOE's Program Opportunity Notice (PON) Program demonstration projects and the Program Research and Development Announcement (PRDA) Program study projects.

Parker, J.T. (ed.)

1982-01-01T23:59:59.000Z

214

Industry participation in DOE-sponsored geopressured geothermal resource development. Final report, 1 September 1977-30 April 1979  

DOE Green Energy (OSTI)

A series of DOE/Industry forums were carried out to keep industry advised of the DOE program to develop the geopressured geothermal resources of the Gulf Coast. A total of eighteen meetings were held with registered attendance of 621 representing a good cross section of industry, state, and federal agencies. An Overview Group and four working subgroups - site selection, drilling and testing, environmental/laboratory research, and legal institutional were established to subdivide the DOE programs into areas of interest and expertise. During the contract period three overview, four site selection, three drilling and testing, five environmental/laboratory research and three legal/institutional meetings have been conducted. Interest in and attendance at the meetings continue to grow reflecting increased industry contact with the DOE Geopressured Geothermal Resource Development Program. Two other studies were carried out for DOE under this contract; a Salt Water Disposal Study and an Industry Survey to evaluate the DOE Resource Development Program. The Salt Water Disposal Study reviewed subsurface salt water disposal experience on the Texas and Louisiana Gulf Coast. This preliminary study concluded that subsurface brine disposal should be possible in the areas of interest with adequate evaluation of the geology of each area and a well designed and constructed surface and subsurface facility. The industry survey indicated general satisfaction with the technical design of the resource evaluation program but felt the program should be moving faster.

Coffer, H.F.

1979-01-01T23:59:59.000Z

215

DOE Technical Standards Program: Procedures  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Technical Standards Procedures Department of Energy Technical Standards Procedures Office of Nuclear Safety The following procedures should be used to write, revise, or maintain a DOE technical standard. They are also used to convert a DOE technical standard to a non-government standard or to form a topical committee. Table of Contents (TSPP-00) Program Overview and Responsibilities (TSPP-01) Initiating DOE Technical Standards (TSPP-02) Use of Voluntary Consensus Standards and Interaction with Standards Development Organizations (TSPP-03) Developing DOE Technical Standard (TSPP-04) Coordination of Technical Standards (TSPP-05) - Draft In Concurrence Resolution - TSPP-06-2009 is the currently approved TSPP that addresses coordination of DOE Technical Standards. Approving and Issuing DOE Technical Standards (TSPP-06)

216

DOE Announces Investment of up to $84 Million in Geothermal Energy |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investment of up to $84 Million in Geothermal Energy Investment of up to $84 Million in Geothermal Energy DOE Announces Investment of up to $84 Million in Geothermal Energy March 4, 2009 - 12:00am Addthis WASHINGTON - U.S. Department of Energy Secretary Steven Chu today announced the release of two Funding Opportunity Announcements (FOAs) for up to $84 million to support the development of Enhanced Geothermal Systems (EGS). Geothermal energy technologies use energy from the earth to heat buildings and generate electricity. Enhanced Geothermal Systems offer the potential to extend geothermal resources to larger areas of the western United States, as well as into new geographic areas of the entire country. These projects will help support the Administration's efforts to invest in clean energy technologies, create millions of new jobs, end our addiction to

217

Program Geothm: A thermodynamic process program for geothermal power plant cycles  

DOE Green Energy (OSTI)

Program GEOTHM is a thermodynamic process program now under development for the LBL Geothermal Energy Program. To date, the program development has centered upon the modeling of working fluid properties, developing thermodynamic process models, and modeling the design performance of geothermal power plants. When the program is completed, it will be able to optimize a power plant or refrigeration plant for minimum cost power or refrigeration. Furthermore, operation of the thermodynamic cycles at off design conditions will be able to be simulated. Program GEOTHM is currently able to calculate several types of geothermal power cycles using a wide variety of working fluids.

Green, M.A.; Pines, H.S.

1974-10-01T23:59:59.000Z

218

Geothermal materials program: strategy. Final report  

DOE Green Energy (OSTI)

The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)

Crane, C.H.; Kenkeremath, D.C.

1980-10-01T23:59:59.000Z

219

DOE Technical Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Revision: 4 Date: August 1, 2000 TECHNICAL STANDARDS COMMENT RESOLUTION U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-7 Comment Resolution Revision: 4 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1 2. COMMENT RESOLUTION ............................................................................................................ 1

220

Geothermal Technologies Office: Geothermal Maps  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE Technical Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Revision: 4 Date: August 1, 2000 USE OF VOLUNTARY CONSENSUS STANDARDS AND INTERACTION WITH STANDARDS DEVELOPMENT ORGANIZATIONS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 Standards Use / Participation DOE-TSPP-3 Revision: 4 Date: August 1, 2000 i PAGE INTENTIONALLY BLANK DOE-TSPP-3 Standards Use / Participation Revision: 4 Date: August 1, 2000 DOE Technical Standards Program ii CONTENTS Paragraph Page 1. SCOPE.............................................................................................................................................1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

222

DOE Seeks to Invest up to $90 Million in Advanced Geothermal Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90 Million in Advanced Geothermal Energy 90 Million in Advanced Geothermal Energy Technology and Research DOE Seeks to Invest up to $90 Million in Advanced Geothermal Energy Technology and Research June 18, 2008 - 1:29pm Addthis WASHINGTON - The U.S. Department of Energy (DOE) today issued a Funding Opportunity Announcement (FOA) for up to $90 million over four years to advance the research, development and demonstration of next-generation geothermal energy technology which will harness the earth's interior heat extracted from hot water or rocks. Currently, DOE has up to $10.5 million available for immediate award under this FOA, with the remainder subject to change and to Congressional appropriations. The FOA addresses the need for additional technical understanding of enhanced geothermal systems (EGS)

223

Wind and Geothermal Incentives Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Wind and Geothermal Incentives Program Wind and Geothermal Incentives Program < Back Eligibility Commercial Industrial Local Government Nonprofit Residential Schools Savings Category Buying & Making Electricity Wind Maximum Rebate Manufacturer loans: 35,000 per job created within 3 years Manufacturer grants: 5,000 per job created within 3 years Loans for geothermal systems: 3 per square foot of space served up to 5 million; also limited to 50% of eligible costs for residential systems. Loans for wind energy production projects: 5 million Grants for wind energy production projects: 1 million Grants for feasibility studies: 50% of cost up to 175,000 Loan guarantee grants: Up to 75% of deficient funds up to 5 million Program Info Funding Source

224

DOE's Round Robin Test Program FAQ Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

Frequently Asked Questions for: DOE's Round Robin Test Program May 2011 i Table of Contents Introduction ......

225

Stanford Geothermal Program Interdisciplinary Research in  

E-Print Network (OSTI)

;Certificate-based Tracking Programs · ERCOT RECs Program (2001) · NEPOOL GIS (2002) · WI RRC Program (2003

Stanford University

226

Geothermal Energy Program Summary Document, FY 1982  

SciTech Connect

Geothermal energy is derived from the internal heat of the earth. Much of it is recoverable with current or near current technology. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural applications. Three principal types of geothermal resources are exploitable through the year 2000. In order of technology readiness, these resources are: hydrothermal; geopressured (including dissolved natural gas); and hot dry rock. In hydrothermal systems, natural water circulation moves heat from deep internal sources toward the earth's surface. Geothermal fluids (water and steam) tapped by drilling can be used to generate electricity or provide direct heat. Geopressured resources, located primarily in sedimentary basins along the Gulf Coast of Texas and of Louisiana, consist of water and dissolved methane at high pressure and at moderately high temperature. In addition to recoverable methane, geopressured resources provide thermal energy and mechanical energy derived from high fluid pressures, although methane offers the greatest immediate value. Commercial development of geopressured energy may begin in the mid-1980s. Economic feasibility depends on the amount of methane that a given well can produce, a highly uncertain factor at present.

1981-01-01T23:59:59.000Z

227

Geothermal Reservoir Well Stimulation Program: technology transfer  

Science Conference Proceedings (OSTI)

Each of the following types of well stimulation techniques are summarized and explained: hydraulic fracturing; thermal; mechanical, jetting, and drainhole drilling; explosive and implosive; and injection methods. Current stimulation techniques, stimulation techniques for geothermal wells, areas of needed investigation, and engineering calculations for various techniques. (MHR)

Not Available

1980-05-01T23:59:59.000Z

228

Geothermal Energy Program Summary Document, FY 1982  

DOE Green Energy (OSTI)

Geothermal energy is derived from the internal heat of the earth. Much of it is recoverable with current or near current technology. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural applications. Three principal types of geothermal resources are exploitable through the year 2000. In order of technology readiness, these resources are: hydrothermal; geopressured (including dissolved natural gas); and hot dry rock. In hydrothermal systems, natural water circulation moves heat from deep internal sources toward the earth's surface. Geothermal fluids (water and steam) tapped by drilling can be used to generate electricity or provide direct heat. Geopressured resources, located primarily in sedimentary basins along the Gulf Coast of Texas and of Louisiana, consist of water and dissolved methane at high pressure and at moderately high temperature. In addition to recoverable methane, geopressured resources provide thermal energy and mechanical energy derived from high fluid pressures, although methane offers the greatest immediate value. Commercial development of geopressured energy may begin in the mid-1980s. Economic feasibility depends on the amount of methane that a given well can produce, a highly uncertain factor at present.

None

1981-01-01T23:59:59.000Z

229

Summary of the planning, management, and evaluation process for the Geothermal Program Review VI conference  

DOE Green Energy (OSTI)

The purpose of this document is to present an overview of the planning, facilitation, and evaluation process used to conduct the Geothermal Program Review VI (PR VI) conference. This document was also prepared to highlight lessons learned from PR VI and, by utilizing the evaluation summaries and recommendations, be used as a planning tool for PR VII. The conference, entitled Beyond Goals and Objectives,'' was sponsored by the US Department of Energy's (DOE) Geothermal Technology Division (GTD), PR VI was held in San Francisco, California on April 19--21, 1988 and was attended by 127 participants. PR VI was held in conjunction with the National Geothermal Association's (NGA) Industry Round Table. This document presents a brief summary of the activities, responsibilities, and resources for implementing the PR VI meeting and provides recommendations, checklists, and a proposed schedule for assisting in planning PR VII.

Not Available

1988-10-01T23:59:59.000Z

230

Geothermal Injection Technology Program: Annual progress report, Fiscal Year 1986  

DOE Green Energy (OSTI)

This report summarizes the Geothermal Injection Technology Program major activities in fiscal year 1986. The Idaho Engineering Laboratory (INEL) and the University of Utah Research Institute (UURI) have been conducting injection research and testing for this program, which was initiated in 1983. Activities at the INEL, representative element nodeling of fracture systems based on stochastic analysis, dual permeability modeling of flow in a fractured geothermal reservoir, and dual permeability model - laboratory and FRACSL-validation studies, are presented first, followed by the University of Utah Research Institute tracer development - experimental studies, which includes a brief description of activities planned for FY-1987.

Not Available

1987-07-01T23:59:59.000Z

231

Hydrogen Program Contacts; DOE Hydrogen Program FY 2008 Annual...  

NLE Websites -- All DOE Office Websites (Extended Search)

1 FY 2008 Annual Progress Report DOE Hydrogen Program JoAnn Milliken, DOE Hydrogen Program Manager and Chief Engineer Office of Hydrogen, Fuel Cells and Infrastructure Technologies...

232

DOE - Office of Legacy Management -- Geothermal Test Facility...  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

233

Cuttings Analysis At Flint Geothermal Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http:en.openei.orgwindex.php?titleCuttingsAnalysisAtFlintGeothermalArea(DOEGTP)&oldid402132...

234

DOE Federal Aviation Program Awards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Awards Program Awards NOMINATION FORM ENTRIES MUST BE MAILED OR FAXED NOT LATER THAN May 19, 2006. Please type your information and use a separate form for each entry. Please attach the "Nomination Criteria Questionnaire" and up to four pages of justification to each form. In the justification, please describe your program-number of aircraft, number of people, mission, flying hours, cost of program, etc. Send to: David N. Lopez, Headquarters U.S. Department of Energy, Office of Aviation Management/MA-30, Room 4B-218, 1000 Independence Ave, NW, , Washington, DC, 20585, or FAX 202-586-6008. Please send digital copies of the nomination forms by e-mail to david.lopez@hq.doe.gov. Name of Program: ______________________________________________________

235

Final Technical Report; Geothermal Resource Evaluation and Definitioni (GRED) Program-Phases I, II, and III for the Animas Valley, NM Geothermal Resource  

DOE Green Energy (OSTI)

This report contains a detailed summary of a methodical and comprehensive assessment of the potential of the Animas Valley, New Mexico geothermal resource leasehold owned by Lightning Dock Geothermal, Inc. Work described herein was completed under the auspices of the Department of Energy (DOE) Cooperative Agreement DE-FC04-00AL66977, Geothermal Resource Evaluation and Definition (GRED) Program, and the work covers the time span from June 2001 through June 2004. Included in this new report are detailed results from the GRED Program, including: geophysical and geochemical surveys, reflection seismic surveys, aeromagnetic surveys, gravity and electrical resistivity surveys, soil thermal ion and soil carbon dioxide flux surveys, four temperature gradient holes, and one deep exploratory well.

Cunniff, Roy A.; Bowers, Roger L.

2005-08-01T23:59:59.000Z

236

Doe Bay Village Resort Pool & Spa Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

Doe Bay Village Resort Pool & Spa Low Temperature Geothermal Facility Doe Bay Village Resort Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Doe Bay Village Resort Pool & Spa Low Temperature Geothermal Facility Facility Doe Bay Village Resort Sector Geothermal energy Type Pool and Spa Location Olga, Washington Coordinates Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

237

DOE's Advanced Turbine Systems Program  

Science Conference Proceedings (OSTI)

This paper discusses the Advanced Turbine Systems (ATS) Program, which is necessary to achieve METC's vision for future IGCC systems. This major new program is a cooperative effort in which DOE's Office of Fossil Energy (FE) and Office of Conservation and Renewable Energy (CE) are joining forces with the private sector to develop ultra-high efficiency gas turbine systems. A goal of this Program is to have a utility-size gas turbine with a 60 percent efficiency (lower heating value basis (LHV)) ready for commercialization by the year 2002. (While this paper focuses on utility-size turbines which are the primary interest of this audience, an ultra-high efficiency, industrial-size gas turbine will also be developed in the ATS Program with a comparable improvement in efficiency.) Natural gas is the target fuel of the Program, a recognition by DOE that natural gas will play a significant role in supplying future power generation needs in the US. However, to insure that the US has fuel supply options, ATS designs will be adaptable to coal and biomass fuels. Therefore, the ATS Program will directly benefit IGCC and other advanced coal based power generation systems. Cost and efficiency improvements in the turbine system as well as in the gasification and gas stream cleanup plant sections will enable IGCC to reach a cost target of $1,000--$1,280/kW and an efficiency goal of 52 percent (higher heating value basis (HHV)) in the post-2000 market.

Bechtel, T.F.; Bajura, R.A.; Salvador, L.A.

1993-01-01T23:59:59.000Z

238

Geothermal Direct Heat Applications Program Summary  

DOE Green Energy (OSTI)

Because of the undefined risk in the development and use of geothermal energy as a thermal energy source, the Department of Energy Division of Geothermal Energy solicited competitive proposals for field experiments in the direct use of geothermal energy. Twenty-two proposals were selected for cost-shared funding with one additional project co-funded by the State of New Mexico. As expected, the critical parameter was developing a viable resource. So far, of the twenty resources drilled, fourteen have proved to be useful resources. These are: Boise, Idaho; Elko heating Company in Nevada; Pagosa Springs, Colorado; Philip School, Philip, South Dakota; St. Mary's Hospital, Pierre, South Dakota; Utah Roses near Salt Lake City; Utah State Prison, Utah; Warm Springs State Hospital, Montana; T-H-S Hospital, Marlin, Texas; Aquafarms International in the Cochella Valley, California; Klamath County YMCA and Klamath Falls in Oregon; Susanville, California and Monroe, utah. Monroe's 164 F and 600 gpm peak flow was inadequate for the planned project, but is expected to be used in a private development. Three wells encountered a resource insufficient for an economical project. These were Madison County at Rexburg, Idaho; Ore-Ida Foods at Ontario, Oregon and Holly Sugar at Brawley, California. Three projects have yet to confirm their resource. The Navarro College well in Corsicana, Texas is being tested; the Reno, Moana, Nevada well is being drilled and the El Centro, California well is scheduled to be drilled in January 1982. The agribusiness project at Kelly Hot Springs was terminated because a significant archeological find was encountered at the proposed site. The Diamond Ring Ranch in South Dakota, and the additional project, Carrie Tingley Hospital in Truth or Consequences, New Mexico both used existing wells. The projects that encountered viable resources have proceeded to design, construct, and in the most advanced projects, to operate geothermal systems for district heating, space heating, grain drying and aquaculture.

None

1981-09-25T23:59:59.000Z

239

Geothermal Direct Heat Applications Program Summary  

SciTech Connect

Because of the undefined risk in the development and use of geothermal energy as a thermal energy source, the Department of Energy Division of Geothermal Energy solicited competitive proposals for field experiments in the direct use of geothermal energy. Twenty-two proposals were selected for cost-shared funding with one additional project co-funded by the State of New Mexico. As expected, the critical parameter was developing a viable resource. So far, of the twenty resources drilled, fourteen have proved to be useful resources. These are: Boise, Idaho; Elko heating Company in Nevada; Pagosa Springs, Colorado; Philip School, Philip, South Dakota; St. Mary's Hospital, Pierre, South Dakota; Utah Roses near Salt Lake City; Utah State Prison, Utah; Warm Springs State Hospital, Montana; T-H-S Hospital, Marlin, Texas; Aquafarms International in the Cochella Valley, California; Klamath County YMCA and Klamath Falls in Oregon; Susanville, California and Monroe, utah. Monroe's 164 F and 600 gpm peak flow was inadequate for the planned project, but is expected to be used in a private development. Three wells encountered a resource insufficient for an economical project. These were Madison County at Rexburg, Idaho; Ore-Ida Foods at Ontario, Oregon and Holly Sugar at Brawley, California. Three projects have yet to confirm their resource. The Navarro College well in Corsicana, Texas is being tested; the Reno, Moana, Nevada well is being drilled and the El Centro, California well is scheduled to be drilled in January 1982. The agribusiness project at Kelly Hot Springs was terminated because a significant archeological find was encountered at the proposed site. The Diamond Ring Ranch in South Dakota, and the additional project, Carrie Tingley Hospital in Truth or Consequences, New Mexico both used existing wells. The projects that encountered viable resources have proceeded to design, construct, and in the most advanced projects, to operate geothermal systems for district heating, space heating, grain drying and aquaculture.

1981-09-25T23:59:59.000Z

240

Raft River well stimulation experiments: geothermal reservoir well stimulation program  

DOE Green Energy (OSTI)

The Geothermal Reservoir Well Stimulation Program (GRWSP) performed two field experiments at the Raft River KGRA in 1979. Wells RRGP-4 and RRGP-5 were selected for the hydraulic fracture stimulation treatments. The well selection process, fracture treatment design, field execution, stimulation results, and pre- and post-job evaluations are presented.

Not Available

1980-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Final environmental statement for the geothermal leasing program  

SciTech Connect

This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

1973-12-31T23:59:59.000Z

242

DOE Technical Standards Program Procedures, Contents, 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1, 2009 iii 1. The Department of Energy (DOE) Technical Standards Program (TSP) The DOE Directives System includes a hierarchy of documents that describe how the Department...

243

STATUS OF GEOTHERMAL RESERVOIR ENGINEERING MANAGEMENT PROGRAM ("GREMP") -DECEMBER, 1979  

E-Print Network (OSTI)

the characteristics of a geothermal reservoir: Items 2, 6,new data important to geothermal reservoir engineering prac-forecast performance of the geothermal reservoir and bore

Howard, J. H.

2012-01-01T23:59:59.000Z

244

DOE Research and Development for the Geothermal Marketplace  

DOE Green Energy (OSTI)

This audience is well aware that the major goal of all geothermal R&D is the successful application of advanced technology in the marketplace. In support of that goal, the Geothermal Technology Division has forged a close link between its research objectives and potentially competitive market applications. Our technical objectives are all expressed in quantified reductions in the cost of geothermal power; these cost reductions are the force that will drive the geothermal industry for the foreseeable future. I agree with the recent statement of Stephen Fye of Unocal that without a legislated incentive for geothermal or disincentive for competing fuels-such as mandated carbon dioxide reductions--any premium the public is willing to pay for the use of this premium fuel will be too small to greatly impact geothermal economics. His conclusion is that the geothermal industry must be fully competitive in the marketplace at current prices. His further conclusion--with which I fully concur--is that the avenue to competitiveness is through research, by both industry and government.

Mock, John E.

1989-03-21T23:59:59.000Z

245

MEMS Materials and Temperature Sensors for Down Hole Geothermal System Monitoring  

E-Print Network (OSTI)

geothermal power plants. US DOE EERE Geothermal Technologieswas made for the US DOE EERE Geothermal Technologies

Wodin-Schwartz, Sarah

2013-01-01T23:59:59.000Z

246

Geothermal direct heat program: roundup technical conference proceedings. Volume II. Bibliography of publications. State-coupled geothermal resource assessment program  

DOE Green Energy (OSTI)

Lists of publications are presented for the Geothermal Resource Assessment Program for the Utah Earth Science Laboratory and the following states: Alaska, Arizona, California, Colorado, Hawaii, Idaho, Kansas, Montana, Nebraska, Nevada, New Mexico, New York, North Dakota, Oregon, Texas, Utah, and Washington.

Ruscetta, C.A. (ed.)

1982-07-01T23:59:59.000Z

247

The 1980-1982 Geothermal Resource Assessment Program in Washington  

DOE Green Energy (OSTI)

Since 1978, the Division of Geology and Earth Resources of the Washington Department of Natural Resources has participated in the U.S. Department of Energy's (USDOE) State-Coupled Geothermal Resource Program. Federal and state funds have been used to investigate and evaluate the potential for geothermal resources, on both a reconnaissance and area-specific level. Preliminary results and progress reports for the period up through mid-1980 have already been released as a Division Open File Report (Korosec, Schuster, and others, 1981). Preliminary results and progress summaries of work carried out from mid-1980 through the end of 1982 are presented in this report. Only one other summary report dealing with geothermal resource investigations in the state has been published. An Information Circular released by the Division (Schuster and others, 1978) compiled the geology, geochemistry, and heat flow drilling results from a project in the Indian Heaven area in the south Cascades. The previous progress report for the geothermal program (Korosec, Schuster, and others, 1981) included information on temperature gradients measured throughout the state, heat flow drilling in the southern Cascades, gravity surveys for the southern Cascades, thermal and mineral spring investigations, geologic mapping for the White Pass-Tumac Mountain area, and area specific studies for the Camas area of Clark County and Mount St. Helens. This work, along with some additional studies, led to the compilation of the Geothermal Resources of Washington map (Korosec, Kaler, and others, 1981). The map is principally a nontechnical presentation based on all available geothermal information, presented as data points, tables, and text on a map with a scale of 1:500,000.

Korosec, Michael A.; Phillips, William M.; Schuster, J.Eric

1983-08-01T23:59:59.000Z

248

CNCC Craig Campus Geothermal Program: 82-well closed loop GHP well field to  

Open Energy Info (EERE)

CNCC Craig Campus Geothermal Program: 82-well closed loop GHP well field to CNCC Craig Campus Geothermal Program: 82-well closed loop GHP well field to provide geothermal energy as a common utility for a new community college campus. Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title CNCC Craig Campus Geothermal Program: 82-well closed loop GHP well field to provide geothermal energy as a common utility for a new community college campus. Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 1: Technology Demonstration Projects Project Description This "geothermal central plant" concept will provide ground source loop energy as a utility to be shared by the academic and residential buildings on the soon-to-be-constructed campus.

249

Geothermal: News  

NLE Websites -- All DOE Office Websites (Extended Search)

News News Geothermal Technologies Legacy Collection Help/FAQ | Site Map | Contact Us | Admin Log On Home/Basic Search About Publications Advanced Search New Hot Docs News Related Links News DOE Geothermal Technologies Program News Geothermal Technologies Legacy Collection September 30, 2008 Update: "Hot Docs" added to the Geothermal Technologies Legacy Collection. A recent enhancement to the geothermal legacy site is the addition of "Hot Docs". These are documents that have been repeatedly searched for and downloaded more than any other documents in the database during the previous month and each preceding month. "Hot Docs" are highlighted for researchers and stakeholders who may find it valuable to learn what others in their field are most interested in. This enhancement could serve, for

250

Technical Proposal Salton Sea Geothermal Power Pilot Plant Program  

DOE Green Energy (OSTI)

The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and injection systems necessary to serve the pilot power and mineral recovery plants planned for Phase 3. The scope of the Area Resource Test Facility Subprogram will include evaluation, costing, design, construction and operation of an ARTF that can serve as a field facility for testing and evaluating high temperature, high salinity geothermal brine utilization components and systems being developed by various organizations and laboratories in the United States. [DJE-2005

None

1975-03-28T23:59:59.000Z

251

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revision: 5 Date: July 1, 2009 TECHNICAL STANDARDS PROGRAM RESPONSIBILITIES U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 DOE-TSPP-1 Responsibilities Revision: 5 Date: July 1, 2009 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE .......................................................................................................................................... 1 1.1 Purpose ..................................................................................................................... 1 1.2 Applicability ............................................................................................................... 1 2. PROGRAM RESPONSIBILITIES

252

DOE enforcement program roles and responsibilities: DOE handbook  

Science Conference Proceedings (OSTI)

The Price-Anderson Act provides indemnification to DOE contractors who manage and conduct nuclear activities in the DOE complex. The government acts as an insurer for these contractors against any findings of liability from the nuclear activities of the contractor within the scope of its contract. 10 CFR Part 820 establishes the legal framework for implementing DOE`s Nuclear Safety Enforcement Program. Integration with other DOE organizations and programs would assure that the enforcement process properly considers the actual or potential safety significance of a violation when determining an appropriate enforcement sanction. Achieving a proactive contractor compliance assurance rather than a heavy enforcement hand, will require a foundation of cooperation and teamwork across DOE organizations. This handbook identifies the areas of interface for the DOE Enforcement Program and provides guidance on roles and responsibilities for the key DOE organizational areas. It complements DOE-HDBK-1087-95 and 1089-95.

NONE

1995-08-01T23:59:59.000Z

253

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-10 Revision: 5 Date: July 1, 2009 CONVERSION OF DOE TECHNICAL STANDARDS TO NON-GOVERNMENT STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 DOE-TSPP-10 Conversion Revision: 5 Date: July 1, 2009 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE .......................................................................................................................................... 1 1.1 Purpose ..................................................................................................................... 1 1.2 Applicability ............................................................................................................... 1

254

A Review of the Geothermal Reservoir Well Stimulation Program  

DOE Green Energy (OSTI)

Republic Geothermal, Inc., and its subcontractors have planned and executed four experimental fracture stimulation treatments under the Department of Energy-funded Geothermal Reservoir Well Stimulation Program (GRWSP). The 2-year program, begun in February 1979, is Ultimately to include six full-scale field hydraulic and chemical stimulation experiments in geothermal wells. This paper describes the overall program and the four treatments completed to date. The GRWSP is organized into two phases. Phase I consists of literature and theoretical studies, laboratory investigations, and numerical work. The main purpose of this work is to establish the technological bases for geothermal well stimulation design. Phase I1 will include the planning, execution, and evaluation of six well stimulation treatments which utilize the technology developed in Phase I. Two stimulation experiments were performed at the Raft River, Idaho, known geothermal resource area (KGRA) in late 1979. This is a naturally fractured, hard rock reservoir with a relatively low geothermal resource temperature 149 C {+-} (300 F{+-}). A conventional planar hydraulic fracture job was performed in Well RRGP-5 and a ''Kiel'' dendritic, or reverse flow, technique was utilized in Well RRGP-4. In mid-1980, two stimulation experiments were performed at the East Mesa, California, KGRA. The stimulation of Well 58-30 provided the first geothermal well fracturing experience in a moderate temperature, 177 C {+-} (350 F{+-}), reservoir with matrix-type rock properties. The two treatments consisted of a conventional hydraulic fracture of a deep, low-permeability zone and a mini-frac ''Kiel'' treatment of a shallow, high-permeability zone in the same well. The stimulation experiment results to date were evaluated using short-term production tests, conventional pressure transient analysis, interference pressure data, chemical and radioactive tracers, borehole acoustic televiewer surveys and numerical models. This combination of evaluation techniques yielded an interpretation of fracture geometry and productivity enhancement. However, the evaluation of artificially induced fractures in naturally fractured formations was found to lead to possibly non-unique solutions. In all the field experiments, artificial fractures were created and well productivity was increased. A discussion of the prestimulation and poststimulation data and their evaluation are provided for each experiment in this report.

Campbell, D. A.; Hanold, R. J.; Sinclair, A. R.; Vetter, O. J.

1981-01-01T23:59:59.000Z

255

Overview of the Geothermal Energy Program Review X: Geothermal Energy and the Utility Market - The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market  

SciTech Connect

This overview at the Geothermal Program Review X: Geothermal Energy and the Utility Market consisted of five presentations: ''Technology Advancements to Support Growth in Geothermal Power Sales in a Dynamic Utility Market'' by John E. Mock; ''Geothermal Energy Market in Southern California: Past, Present and Future'' by Vikram Budraja; ''Taking the High Ground: Geothermal's Place in the Revolving Energy Market'' by Richard Jaros; ''Recent Developments in Japan's Hot Dry Rock Program'' by Tsutomu Yamaguchi; and ''Options in the Eleventh Year for Interim Standard Offer Number Four Contracts'' by Thomas C. Hinrichs.

Mock, John E.; Budraja, Vikram; Jaros, Richard; Yamaguchi, Tsutomu; Hinrichs, Thomas C.

1992-01-01T23:59:59.000Z

256

DOE Mentoring Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Mentoring Program DOE Mentoring Program DOE Mentoring Program The Office of Learning and Workforce Development coordinates this mentoring program for DOE Federal Employees. The DOE Mentoring Program provides enriching experiences through reciprocal relationships and opportunities by sharing knowledge, leveraging skills, and cultivating talent. It provides a series of developmental experiences for matched mentoring pairs and designated groups. The primary goal of the relationships is personal and professional development for individuals. Through the mentoring relationship, mentors have the opportunity to coach, guide and share experiences, knowledge, and skills which will contribute to the Mentee's professional development. Mentoring opportunities will vary according to the needs and interests of the Mentee and the organization.

257

Magma energy and geothermal permeability enhancement programs  

DOE Green Energy (OSTI)

Accomplishments during FY85 and project plans for FY86 are described for the Magma Energy Extraction and Permeability Enhancement programs. (ACR)

Dunn, J.C.

1985-01-01T23:59:59.000Z

258

Stanford Geothermal Program, reservoir and injection technology. Fourth annual report  

DOE Green Energy (OSTI)

This annual report of the Stanford Geothermal Program presents major projects in reservoir and injection technology. The four include: (1) an application of the boundary element method to front tracking and pressure transient testing; (2) determination of fracture aperture, a multi-tracer approach; (3) an analysis of tracer and thermal transients during reinjection; and, (4) pressure transient modeling of a non-uniformly fractured reservoir. (BN)

Horne, R.; Ramey, H.J. Jr.; Miller, F.G.; Brigham, W.E.; Kruger, P.

1988-12-01T23:59:59.000Z

259

DOE Scholars Program | Explore the Possibilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Scholars Program Scholars Program Explore the possibilities Home Overview Application Participants Mentors FAQs About ORAU Contact facebook logo twitter logo The DOE Scholars Program introduces students or recent college graduates to DOE's mission and operations. As a participant in the DOE Scholars Program, you will earn a competitive edge by familiarizing yourself with DOE functions while showcasing your education, talent and skills. The application opens October 14, 2013, and closes January 12, 2014. Apply Now DOE Scholars Program Flyer Download the DOE Scholars Program flyer (PDF) Gage Richert Research Profile - Gage Richert Seeking to gain some professional development in a nuclear science field, Gage Richert thought the DOE Scholars Program would be a natural step toward his career goals. He joined the Office of Innovative Nuclear

260

Reasons for the termination of, and DOE losses in, a geothermal demonstration powerplant project  

DOE Green Energy (OSTI)

The 50-megawatt Baca geothermal demonstration powerplant project, located in northern New Mexico, was the Department of Energy's (DOE's) initial effort to demonstrate geothermal powerplant technology. The project, started in 1978, was believed to have a high probability of success, and its cost was to be shared equally with the industry participants. GAO's review showed that the project was terminated in January 1982 because sufficient geothermal steam to operate the powerplant could not be obtained. The early termination resulted in DOE paying a disproportionate share - $45 million, or 64% - of the $70 million spent on the project because it had paid the majority of the powerplant-related costs at that time. However, a portion of these costs may be recovered through the sale of powerplant equipment. DOE indicated that it learned lessons from this experience and will act to prevent these problems from occurring on other projects.

Not Available

1983-09-29T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-6  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Date: July 1, 2009 COORDINATION OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 Coordination DOE-TSPP-6 Revision: 7 DOE Technical Standards Program Date: July 1, 2009 1 CONTENTS 1. SCOPE....................................................................................................................................1 1.1 Purpose .......................................................................................................................1 1.2 Applicability .................................................................................................................1 2. DOCUMENT COORDINATION...............................................................................................1

262

Overview of recent supercritical binary geothermal cycle experiments from the Heat Cycle Research Program  

DOE Green Energy (OSTI)

The Heat Cycle Research Program, which is being conducted for the Department of Energy, has as its objective the development of the technology for effecting improved utilization of moderate temperature geothermal resources. Testing at the Heat Cycle Research Facility located at the DOE Geothermal Test Facility East Mesa, California involves supercritical vaporization and counterflow in-tube condensing in an organic Rankine cycle. Results of the experiments are given for both pure and mixed-hydrocarbon working fluids. The heater and condenser behavior predicted by the Heat Transfer Research, Inc. computer codes used for correlation of the data was in excellent agreement with experimental results. A special series of tests, conducted with propane and up to approximately 40% isopentane concentration, indicated that a close approach to ''integral'' condensation was occurring in the vertically-oriented condenser. Preliminary results of tests in which the turbine expansion ''passed through the two-phase region'' did not indicate efficiency degradation assignable to these metastable expansion processes.

Demuth, O.J.; Bliem, C.J.; Mines, G.L.; Swank, W.D.

1986-01-01T23:59:59.000Z

263

DOE hot dry rock program  

DOE Green Energy (OSTI)

Hydraulic fracturing has been used to create and subsequently to enlarge the first hot dry rock heat-extraction loop at Fenton Hill, New Mexico. Encouraging results prompted the DOE to expand this project into a program of national scope. The elements of that Program and their present status are discussed. Emphasis is given the ongoing Fenton Hill Project where techniques and information developed in the existing research system will soon be used to produce a multiply-fractured engineering system in hotter rock at the same site. Recent results from research loop operation and progress in constructing the engineering system are reported. Although acoustic mapping and system geometry indicate that the primary hydraulic fractures are essentially vertical, relatively low fracturing pressure and absence of a sharp breakdown suggest that at Fenton Hill fracture initiation occurs by reopening of old natural fractures rather than by initiation of new ones. Flow patterns and temperature behavior suggest opening of additional old fractures as the loop is operated. Except where the hot fluid leaves the crack system to enter the production well, flow impedances are very low without either artificial propping or inflation by pressurization.

Nunz, G.J.

1980-01-01T23:59:59.000Z

264

Program Review - Geothermal Exploration and Assessment Technology Program; Including a Report of the Reservoir Engineering Technical Advisory Group  

DOE Green Energy (OSTI)

In 1978, The Division of Geothermal Energy of the Department of Energy established the Geothermal Exploration and Assessment Technology Program. The purpose of this program is to ''provide assistance to the Nation's industrial community by helping to remove technical and associated economic barriers which presently inhibit efforts to bring geothermal electric power production and direct heat application on line''. In the near term this involves the adaptation of exploration and assessment techniques from the mineral and petroleum industry to geothermal applications. In the near to far term it involves the development of new technology which will improve the cost effectiveness of geothermal exploration.

Nielson, Dennis L., ed.

1979-12-01T23:59:59.000Z

265

Federal hot dry rock geothermal energy development program: an overview  

DOE Green Energy (OSTI)

The formulation and evolution of the Federal Hot Dry Rock Geothermal Energy Development Program at the Los Alamos Scientific Laboratory are traced. Program motivation is derived from the enormous potential of the resource. Accomplishments to date, including the establishment and evaluation of the 5-MW/sub t/ Phase 1 reservoir at Fenton Hill, NM and various instrument and equipment developments, are discussed. Future plans presented include (1) establishment of a 20- to 50-MW/sub t/ Phase 2 reservoir at Fenton Hill that will be used to demonstrate longevity and, eventually, electric power production and (2) the selection of a second site at which a direct thermal application will be demonstrated.

Nunz, G.J.

1979-01-01T23:59:59.000Z

266

DOE Certification Programs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Certification Programs DOE Certification Programs DOE Certification Programs The following are certification programs offered at DOE: Acquisition Career Management Program (ACMP) - is managed by the Office of Acquisition and Project Management's (OAPM) Professional Development Division (PDD). ACMP implements Federal Acquisition Certifications established by the Office of Federal Procurement Policy in accordance with the provisions of 41 USC 433 regarding professionalization of the non-DOD acquisition workforce. IT Project Management Qualification Process - is developed by the Office of the Chief Information Officer (OCIO) to provide a framework for certifying Federal IT Project Managers as having the qualifications necessary to manage IT projects. Per the Office of Management and Budget

267

Industry participation in DOE-sponsored geopressured geothermal research development. Final report, May 1, 1979-April 30, 1982  

DOE Green Energy (OSTI)

Nine DOE/Industry Forum meetings where the progress of DOE's resource development program was outlined and discussed were planned, organized, conducted, and reported. These nine forum meetings included three meetings of the Drilling and Testing group, two Site Selection meetings, one meeting each of the Legal and Environmental groups and two Overview meetings where the entire DOE program was discussed. Summaries of each of these meetings are included and the progress of DOE's geopressured geothermal resource evaluation program from its early beginnings to demonstration of the tremendous size and widespread availability of this supplementary energy resource are shown. Attendees at the meetings represented a broad cross section of state and federal agencies and potential users and developers of this large energy source. Attendance at meetings averages 50 to 80 with the most interest shown at meetings where reservoir testing results were discussed. In addition to the forums 16 newsletters were prepared and distributed to all participants. These were instituted to keep industry apprised of the latest developments in this DOE resource evaluation program. Three additional studies were carried out for DOE under this contract: a reservoir continuity study, a survey of gas stripping operations, and the development of a lease agreement for design well prospects.

Coffer, H.F.

1982-07-01T23:59:59.000Z

268

Recent developments in the hot dry rock geothermal energy program  

DOE Green Energy (OSTI)

In recent years, most of the Hot Dry Rock Programs effort has been focused on the extraction technology development effort at the Fenton Hill test site. The pair of approximately 4000 m wells for the Phase II Engineering System of the Fenton Hill Project have been completed. During the past two years, hydraulic fracture operations have been carried out to develop the geothermal reservoir. Impressive advances have been made in fracture identification techniques and instrumentation. To develop a satisfactory interwellbore flow connection the next step is to redrill the lower section of one of the wells into the fractured region. Chemically reactive tracer techniques are being developed to determine the effective size of the reservoir area. A new estimate has been made of the US hot dry rock resource, based upon the latest geothermal gradiant data. 3 figs.

Franke, P.R.; Nunz, G.J.

1985-01-01T23:59:59.000Z

269

The hot dry rock geothermal energy program  

DOE Green Energy (OSTI)

The paper presents a simplified description of the Department of Energy's Hot-Dry-Rock program conducted at Fenton Hill, New Mexico. What a hot-dry-rock resource is and what the magnitude of the resource is are also described.

Smith, M.C.

1987-09-01T23:59:59.000Z

270

DOE Wind Program Update: June 4, 2006;  

SciTech Connect

The DOE Wind Program Update provides WindPower Conference attendees with information about recent DOE events, including Assistant Secretary Karsner, a wind turbine blade test facility CRADA, and 2005 Wind Energy Award recipients.

2006-06-01T23:59:59.000Z

271

Kentucky DOE-EPSCoR Program  

SciTech Connect

The KY DOE EPSCoR Program included efforts to impact positively the pipeline of science and engineering students and to establish research, education and business infrastructure, sustainable beyond DOE EPSCoR funding.

Stencel, J.M.; Ochsenbein, M.P.

2003-04-14T23:59:59.000Z

272

8/10/2010 1 DOE Offshore Wind RFI Response: DEOA-EE0000385, DOE Offshore Wind Program, Input Requested for  

E-Print Network (OSTI)

onshore wind and other renewable energy sources including solar, geothermal, biomass, and small hydro-Losique, Program Manager, Wind and Water Power Program (WWPP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy (DOE) Dear Mr. Beaudry-Losique, Staff of the California Energy Commission provide

Islam, M. Saif

273

Wind and Geothermal Incentives Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schools Schools Savings Category Buying & Making Electricity Wind Maximum Rebate Manufacturer loans: 35,000 per job created within 3 years Manufacturer grants: 5,000 per job created within 3 years Loans for geothermal systems: 3 per square foot of space served up to 5 million Loans for wind energy production projects: 5 million Grants for wind energy production projects: 1 million Grants for feasibility studies: 50% of cost up to 175,000 Loan guarantee grants: Up to 75% of deficient funds up to 5 million Program Info Funding Source Alternative Energy Investment Fund (state-issued bonds) Start Date January 2009 State Pennsylvania Program Type State Grant Program Rebate Amount Varies by project, but program generally requires matching funds at least equivalent to DCED funding

274

Geothermal Technologies Office: Geothermal Electricity Technology...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

275

Geothermal Technologies Office: Enhanced Geothermal Systems Technologi...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

276

Geothermal Technologies Office: Enhanced Geothermal Systems  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

277

DOE Technical Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A TECHNICAL STANDARD U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-2 Need Revision: 4 Date: August 1, 2000 DOE...

278

Review of the geothermal reservoir well stimulation program  

SciTech Connect

The overall program and the four experimental fracture stimulation treatments completed to date are described. The GRWSP is organized into two phases. Phase I consists of studies (literature and theoretical), laboratory investigations, and numerical work. Phase II will include the planning, execution and evaluation of six well stimulation treatments which utilize the technology developed in Phase I. Two stimulation experiments were performed at the Raft River, Idaho, Known Geothermal Resource Area (KGRA) in late-1979. This is a naturally fractured, hard rock reservoir with a relatively low geothermal resource temperature (300/sup 0/F). A conventional planar hydraulic fracture job was performed in Well RRGP-5 and a Kiel dendritic (or reverse flow) technique was utilized in Well RRGP-4. In mid-1980, two stimulation experiments were performed at the East Mesa, California, KGRA. The stimulation of Well 58-30 provided the first geothermal well fracturing experience in a moderate temperature (350/sup 0/F/sup +/) reservoir with matrix type rock properties. The two treatments consisted of a conventional hydraulic fracture of a deep, low permeability zone and a minifrac Kiel treatment of a shallow, high permeability zone in the same well. The stimulation experiment results to date were evaluated using short-term production tests, conventional pressure transient analysis, interference pressure data, chemical and radioactive tracers, borehole acoustic televiewer surveys, and numerical models.

Campbell, D.A.; Hanold, R.J.; Sinclair, A.R.; Vetter, O.J.

1981-01-01T23:59:59.000Z

279

Federal Assistance Program Quarterly Project Progress Report. Geothermal Energy Program: Information Dissemination, Public Outreach, and Technical Analysis Activities. Reporting Period: January 1 - March 31, 2001 [Final report  

SciTech Connect

The final report of the accomplishments of the geothermal energy program: information dissemination, public outreach and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association and the Washington State University Energy Program.

Lund, John W.

2002-03-22T23:59:59.000Z

280

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-9  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Revision: 6 Date: July 1, 2009 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 6 Date: July 1, 2009 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE .......................................................................................................................................... 1 1.1 Purpose ..................................................................................................................... 1 1.2 Applicability ............................................................................................................... 1 2. DOCUMENT MAINTENANCE...................................................................................................... 1

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Daemen Alternative Energy/Geothermal Technologies Demonstration Program Erie County  

SciTech Connect

The purpose of the Daemen Alternative Energy/Geothermal Technologies Demonstration Project is to demonstrate the use of geothermal technology as model for energy and environmental efficiency in heating and cooling older, highly inefficient buildings. The former Marian Library building at Daemen College is a 19,000 square foot building located in the center of campus. Through this project, the building was equipped with geothermal technology and results were disseminated. Gold LEED certification for the building was awarded. 1) How the research adds to the understanding of the area investigated. This project is primarily a demonstration project. Information about the installation is available to other companies, organizations, and higher education institutions that may be interested in using geothermal energy for heating and cooling older buildings. 2) The technical effectiveness and economic feasibility of the methods or techniques investigated or demonstrated. According to the modeling and estimates through Stantec, the energy-efficiency cost savings is estimated at 20%, or $24,000 per year. Over 20 years this represents $480,000 in unrestricted revenue available for College operations. See attached technical assistance report. 3) How the project is otherwise of benefit to the public. The Daemen College Geothermal Technologies Ground Source Heat Pumps project sets a standard for retrofitting older, highly inefficient, energy wasting and environmentally irresponsible buildings?¢????quite typical of many of the buildings on the campuses of regional colleges and universities. As a model, the project serves as an energy-efficient system with significant environmental advantages. Information about the energy-efficiency measures is available to other colleges and universities, organizations and companies, students, and other interested parties. The installation and renovation provided employment for 120 individuals during the award period. Through the new Center, Daemen will continue to host a range of events on campus for the general public. The College does not charge fees for speakers or most other events. This has been a long-standing tradition of the College.

Robert C. Beiswanger, Jr.

2010-05-20T23:59:59.000Z

282

GeoPowering the West: Hawaii; Why Geothermal?  

DOE Green Energy (OSTI)

This fact sheets provides a summary of geothermal potential, issues, and current development in Hawaii. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

Not Available

2004-04-01T23:59:59.000Z

283

International Programs and Agreements in Geothermal Energy. An Interim report  

DOE Green Energy (OSTI)

This report contains the interim results of a study for the Division of Geothermal Energy on the Division's international programs and activities. The complete research program, which is scheduled to be finished i November 1978, will have the following elements: (1) an assessment of objectives that have motivated the formulation of international programs and an explanation of any changes in the evolution of those programs. These objectives will be assessed for their internal consistency, degree of governmental consensus, their practicality, the current status of their accomplishments, and the implications of their accomplishments for the role of DGE. (2) An assessment of organizational structures and teams, including the identity of key decisionmakers, the nature of the interagency process, procedures for generating nongovernmental support for international programs and the success of these procedures, and the effectiveness of the interface with foreign partners. (3) Assessment of results of international cooperative programs, which involve the development of an overall balance sheet of benefits and disbenefits attributed to each international program. (4) The formulation of future international cooperative programs based on the assessments described. These programs may involve the development of new exchanges, alteration or elimination of existing exchanges, and revisions in the management of exchanges by US government agencies.

Oppenheimer, M.; Fein, E.; Bye, J.

1978-06-01T23:59:59.000Z

284

Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)  

SciTech Connect

The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support project facilities in a safe and environmentally acceptable manner; and non-power generating alternatives, such as conservation and demand-side management.

None

1992-09-18T23:59:59.000Z

285

Other DOE Tribal Programs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Tribal Programs DOE Tribal Programs Other DOE Tribal Programs Learn about other U.S. Department of Energy (DOE) programs in addition to the Office of Indian Energy that offer helpful information for Tribes. Office of Energy Efficiency and Renewable Energy Tribal Energy Program The Tribal Energy Program offers financial and technical assistance to Indian Tribes to help them evaluate and develop renewable energy resources and reduce energy consumption through efficiency and weatherization. As building knowledge and skills is essential to developing, implementing, and sustaining energy efficiency and renewable energy projects, the program also offers education and training opportunities. Better Buildings Initiative Through a variety of efficiency improvements (e.g. new lighting, greater

286

Wind and Geothermal Incentives Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savings Category Savings Category Buying & Making Electricity Wind Maximum Rebate Manufacturer loans: 35,000 per job created within 3 years Manufacturer grants: 5,000 per job created within 3 years Loans for geothermal systems: 3 per square foot of space served up to 5 million Loans for wind energy production projects: 5 million Grants for wind energy production projects: 1 million Grants for feasibility studies: 50% of cost up to 175,000 Loan guarantee grants: Up to 75% of deficient funds up to 5 million Program Info Funding Source Alternative Energy Investment Fund (state issued bonds) Start Date January 2009 State Pennsylvania Program Type Industry Recruitment/Support Rebate Amount Varies by project, but program generally requires matching funds at least equivalent to DCED funding

287

DOE Hydrogen Program Presentation Template  

NLE Websites -- All DOE Office Websites (Extended Search)

* Steve Paglieri, LANL, coats the alloys, does some permeation tests, and oversees welding into tubes, life analysis. * Mike Ciocco, NETL, oversees most permeation tests and...

288

History of the DOE Human Genome Program  

Office of Scientific and Technical Information (OSTI)

History of the DOE Human Genome Program History of the DOE Human Genome Program The following history is taken from the U.S. Department of Energy 1991-91 Human Genome Program Report (June 1992). This is an archived item. A brief history of the U.S. Department of Energy (DOE) Human Genome Program will be useful in a discussion of the objectives of the DOE program as well as those of the collaborative U.S. Human Genome Project. The Office of Health and Environmental Research (OHER) of DOE and its predecessor agencies--the Atomic Energy Commission and the Energy Research and Development Administration--have long sponsored research into genetics, both in microbial systems and in mammals, including basic studies on genome structure, replication, damage, and repair and the consequences of genetic

289

Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, January 1981-March 1981  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods as they apply to advanced drilling systems.

Kelsey, J.R. (ed.)

1981-06-01T23:59:59.000Z

290

Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, October 1980-December 1980  

Science Conference Proceedings (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development.

Kelsey, J.R. (ed.)

1981-03-01T23:59:59.000Z

291

SHAFT78: a two-phase multidimensional computer program for geothermal reservoir simulation  

DOE Green Energy (OSTI)

The computer program SHAFT78 was developed to compute two-phase flow phenomena in geothermal reservoirs. The program solves transient initial-value problems with prescribed boundary-conditions in up to three space dimensions. The solution method is an explicit-implicit IFD approach which does not distinguish between 1, 2, or 3-D coordinate systems and allows a flexible choice of the shape of the discrete grid elements. The mass-and-energy equations are formulated in conservative form. The stability and convergence of the algorithm is controlled by an automatic choice of time steps - partially controlled by the user. Although the program has been developed for use in simulating production and injection in geothermal reservoirs, there are other two-phase problems for which it is either immediately applicable, or for which it can be modified to be applicable. All fluid parameters, such as viscosity, heat capacity, heat conductivity, etc., can be specified as functions of temperature and pressure, and all parameters can vary with position. The program can handle up to seven different anisotropic rocks, with all rock parameters assumed to be independent of position, temperature, and pressure. (MHR)

Pruess, K.; Schroeder, R.C.; Witherspoon, P.A.; Zerzan, J.M.

1979-11-01T23:59:59.000Z

292

Enhanced Geothermal Systems (EGS) R&D Program, Status Report: Foreign Research on Enhanced Geothermal Systems  

DOE Green Energy (OSTI)

This report reviews enhanced geothermal systems (EGS) research outside the United States. The term ''enhanced geothermal systems'' refers to the use of advanced technology to extract heat energy from underground in areas with higher than average heat flow but where the natural permeability or fluid content is limited. EGS covers the spectrum of geothermal resources from low permeability hydrothermal to hot dry rock.

McLarty, Lynn; Entingh, Daniel

2000-09-29T23:59:59.000Z

293

Geothermal Loan Guarantee Program: Westmorland Development Project, Imperial County, California: Environmental assessment  

DOE Green Energy (OSTI)

The action assessed is the guaranty of a loan by DOE to finance geothermal exploration, development, and testing by Mapco Geothermal, Inc. and Republic Geothermal, Inc. in the Westmorland area of Imperial County, California. Initial drilling and flow testing of up to three production wells will occur in the exploratory phase. Exploration is proposed for either or both of two portions of the leasehold area. If exploration confirms the presence of a viable resource in the Sweetwater area, the preferred site based on limited temperature data, then up to 19 new production wells and three new injection wells may be drilled and tested there in preparation for the construction of a 55-MW double-flash electric power plant. If, however, the Sweetwater resource proves infeasible, further exploration and possible full-field development may occur instead at the Dearborn-Kalin-Landers area. At this site, up to 19 new production wells and three new injection wells may be drilled and tested, with six existing wells also used for injection. This environmental assessment chiefly addresses effects of the drilling and testing program. In summary, this paper discusses the proposed action, describes the existing environment and discusses the potential environmental impacts. 75 refs. (LSP)

Not Available

1979-04-01T23:59:59.000Z

294

DOE Order 440. 1 B: Worker Protection Program for DOE (Including...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees Stakeholders:...

295

Geothermal reservoir well stimulation program. First-year progress report  

DOE Green Energy (OSTI)

The Geothermal Reservoir Well Stimulation Program (GRWSP) group planned and executed two field experiments at the Raft River KGRA during 1979. Well RRGP-4 was stimulated using a dendritic (Kiel) hydraulic fracture technique and Well RRGP-5 was stimulated using a conventional massive hydraulic fracture technique. Both experiments were technically successful; however, the post-stimulation productivity of the wells was disappointing. Even though the artificially induced fractures probably successfully connected with the natural fracture system, reservoir performance data suggest that productivity remained low due to the fundamentally limited flow capacity of the natural fractures in the affected region of the reservoir. Other accomplishments during the first year of the program may be summarized as follows: An assessment was made of current well stimulation technology upon which to base geothermal applications. Numerous reservoirs were evaluated as potential candidates for field experiments. A recommended list of candidates was developed which includes Raft River, East Mesa, Westmorland, Baca, Brawley, The Geysers and Roosevelt Hot Springs. Stimulation materials (fracture fluids, proppants, RA tracer chemicals, etc.) were screened for high temperature properties, and promising materials selected for further laboratory testing. Numerical models were developed to aid in predicting and evaluating stimulation experiments. (MHR)

Not Available

1980-02-01T23:59:59.000Z

296

Federal Energy Management Program: Geothermal Resources and Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Geothermal Resources and Technologies Geothermal Resources and Technologies Photo of steam rising high in the air from a geyser. Geothermal energy leverages heated air and water from beneath the earth's surface. This page provides a brief overview of geothermal energy resources and technologies supplemented by specific information to apply geothermal systems within the Federal sector. Overview Geothermal energy is produced from heat and hot water found within the earth. Federal agencies can harness geothermal energy for heating and cooling air and water, as well as for electricity production. Geothermal resources can be drawn through several resources. The resource can be at or near the surface or miles deep. Geothermal systems move heat from these locations where it can be used more efficiently for thermal or electrical energy applications. The three typical applications include:

297

Geothermal: Home Page  

Office of Scientific and Technical Information (OSTI)

Home Page Home Page Geothermal Technologies Legacy Collection Help/FAQ | Site Map | Contact Us Home/Basic Search About Publications Advanced Search New Hot Docs News Related Links Search for: (Place phrase in "double quotes") Sort By: Relevance Publication Date System Entry Date Document Type Title Research Org Sponsoring Org OSTI Identifier Report Number DOE Contract Number Ascending Descending Search Quickly and easily search geothermal technical and programmatic reports dating from the 1970's to present day. These "legacy" reports are among the most valuable sources of DOE-sponsored information in the field of geothermal energy technology. See "About" for more information. The Geothermal Technologies Legacy Collection is sponsored by the Geothermal Technologies Program, DOE Energy Efficiency and Renewable Energy

298

Texas geothermal R D and D program planning support document. Final report  

DOE Green Energy (OSTI)

Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

1981-08-28T23:59:59.000Z

299

The Geopressured-Geothermal Program: Energy conversion status and future possibilities  

DOE Green Energy (OSTI)

The Geopressured-Geothermal Program, sponsored by the Department of Energy (DOE) began in 1976 with the Wells of Opportunity. This early research concentrated on resource characterization at several locations in Texas and Louisiana. More recently, the program has included well operations and supporting university research in geoscience and engineering. Long term flow testing, reinjection of brine, and scale prevention were accomplished at the Gladys McCall Well. The Pleasant Bayou Well provided additional data for modeling and predicting geopressured reservoir behavior. This year a hybrid power system (HPS) was constructed at Pleasant Bayou in cooperation with the Electric Power Research Institute (EPRI). This is the first conversion of the geopressured-geothermal resource to electricity. An economic review of geopressured-geothermal resource development concludes that using off-the-shelf technology, electricity can be produced for $0.125/kWh from a Gladys McCall type resource (40,000 bpd brine production, 27 scf methane/bbl, 288{degree}F brine, and 10-year resource life). The Pleasant Bayou type resource can produce electricity for $0.32/kWh. Advanced technology could reduce the cost to $0.16/kWh. A review and status of the HPS is presented with future possibilities for the program, including (1) recovery of medium and heavy oil with hot geopressured brine, (2) direct use, especially aquaculture, and (3) development and use of advanced technology for conversion at the Hulin Well, the deepest, hottest well in the program. The estimated improvement in efficiencies with advanced conversion technology range from 100 to 160%. This would greatly reduce the cost to produce electricity. 6 refs., 7 figs., 2 tabs.

Negus-de Wys, J.; Lawford, T.W.; Faulder, D.D. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

1989-01-01T23:59:59.000Z

300

DOE Technical Standards Program: Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

e-mail: jeffrey.feit@hq.doe.gov burgundy dot image To register a new project or Technical Standards Manager, or for information on topical committees: Kathy Knight phone:...

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Geothermal technology development program. Annual progress report, October 1981-September 1982  

DOE Green Energy (OSTI)

The status of ongoing Research and Development (R and D) within the Geothermal Technology Development Program is described. The program emphasizes research in rock penetration mechanics, fluid technology, borehole mechanics, diagnostics technology, and permeability enhancement.

Kelsey, J.R. (ed.)

1983-08-01T23:59:59.000Z

302

Geothermal and geopressure blowout control. Phase I. Study of existing technology. Phase II. Program plan for geothermal and geopressure blowout control  

DOE Green Energy (OSTI)

Four papers on existing technology and program planning for blowout control in geothermal and geopressured systems are included. Separate abstracts were prepared for each. (MHR)

Rehm, W.A.; Goins, W.C. Jr.

1978-11-01T23:59:59.000Z

303

The U.S. Department of Energy's Geothermal Reservoir Technology Program  

Science Conference Proceedings (OSTI)

Geothermal reservoir engineering is an important aspect f the Department of Energys Geothermal Technology Division, geothermal research and development program. Reservoir engineering-related research, a component of all geosciences activities, is of particular importance in the context of Hydrothermal Reservoir Research. Three closely related research activities (Brine Injection, Reservoir Definition, and Caldera Reservoir Investigations) are now combined under the more general heading of Reservoir Technology. Scientific investigations, as part of the Salton Sea Scientific Drilling Program, also contribute greatly to the understanding of the behavior of high-temperature hydrothermal convection systems. With the creation of the Geothermal Technology Organization, where geothermal research will be cost-shard with industry, it is anticipated that a number of research topics will be brought to the point where the geothermal industry can rapidly put new technology into use. 2 tabs., 2 figs.

Mock, John E.; Blackett, Robert E.

1987-01-20T23:59:59.000Z

304

DOE Technical Standards Program: Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Technical Standards Archives Office of Nuclear Safety Number Title Status TSPP-00 Technical Standards Program Topical Committees (TSPP-00) PDF TSPP-00 TSPP-01...

305

DOE Lighting Program Update: LED Validation Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Lighting Program Update DOE Lighting Program Update LED Validation Activities Kelly Gordon Pacific Northwest National Laboratory Federal Utility Partnership Working Group April 15, 2010 Providence, RI www.ssl.energy.gov 2 | Solid-State Lighting Program Legislative Mandate The DOE is directed by U.S. government policy (EPACT 2005, Section 912) to: "...support research, development, demonstration, and commercial application activities related to advanced solid-state lighting technologies based on white light emitting diodes." DOE Lighting Program www.ssl.energy.gov 3 | Solid-State Lighting Program SSL Energy Saving Potential By 2030: * Potential to cut U.S. lighting electricity use by 25% * Cumulative energy savings: $120 billion * Annual energy savings equivalent to:

306

Puna Geothermal Research Facility technology transfer program. Final report, August 23, 1985--August 23, 1989  

DOE Green Energy (OSTI)

The funds were used in a series of small grants to entrepreneurs demonstrating the direct use of geothermal heat supplied by Hawaii`s HGP-A well; this effort was known as the Community Geothermal Technology Program. Summaries are presented of the nine completed projects: fruit dehydration, greenhouse bottom heating, lumber kiln, glass making, cloth dyeing, aquaculture (incomplete), nursery growing media pasteurization, bronze casting, and electrodeposition from geothermal brine.

Takahashi, P.

1989-12-31T23:59:59.000Z

307

The Department of Energy and The U.S. Geothermal Energy Program  

SciTech Connect

US geothermal resources are classified according to resource type and estimates of these resources are presented under the categories of (1) maximum resource base, (2) technically recoverable resources, and (3) economically available resources. The objective of the federally funded geothermal program is to accelerated commercial, I.e., non-federal, development of all types of geothermal energy through resource assessment, leasing of federal lands, demonstrations of various types, loan guaranties, and technology development.

Carwile, C.

1981-01-01T23:59:59.000Z

308

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Revision: 5 Date: July 1, 2009 ESTABLISHING THE NEED FOR A TECHNICAL STANDARD U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 DOE-TSPP-2 Need Revision: 5 Date: July 1, 2009 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE .......................................................................................................................................... 1 1.1 Purpose ..................................................................................................................... 1 1.2 Applicability ............................................................................................................... 1

309

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Revision: 6 Date: July 1, 2009 REGISTERING A TECHNICAL STANDARD PROJECT U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 DOE-TSPP-4 Registration Revision: 6 Date: July 1, 2009 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE .......................................................................................................................................... 1 1.1 Purpose ..................................................................................................................... 1 1.2 Applicability ............................................................................................................... 1 2. REGISTERING THE PROJECT................................................................................................... 1

310

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-7  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Revision: 5 Date: July 1, 2009 TECHNICAL STANDARDS COMMENT RESOLUTION U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585 DOE-TSPP-7 Comment Resolution Revision: 5 Date: July 1, 2009 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE .......................................................................................................................................... 1 1.1 Purpose ..................................................................................................................... 1 1.2 Applicability ............................................................................................................... 1 2. COMMENT RESOLUTION........................................................................................................... 1

311

Recommendations of the industry advisory panel on geothermal reservoir definition  

DOE Green Energy (OSTI)

The objectives of the August 1984 meeting of the advisory panel are listed. The panel's comments on DOE's Geothermal Program and industry's needs and priorities are presented. (MHR)

Gulati, M.S.; Lippmann, M.J.

1985-01-01T23:59:59.000Z

312

Programmatic Objectives of the Geothermal Technology Division: Volume 1  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE - 2005)

Meridian Corporation, Alexandria, VA

1989-05-01T23:59:59.000Z

313

Elastomer liners for geothermal tubulars Y267 EPDM Liner Program:  

DOE Green Energy (OSTI)

The elastomer, Y267 EPDM, has been identified as a hydrothermally stable material which can operate at temperatures in excess of 320/sup 0/C. The goal of the Y267 Liner Program was to demonstrate the feasibility of using this material as a liner for mild steel tubulars to prevent or mitigate corrosion. If successful, the usage of EPDM lined pipe by the geothermal community may have a significant impact on operating costs and serve as a viable alternative to the use of alloyed tubulars. Tooling procedures were developed under this program to mold a 0.64 cm (0.25'') thick Y267 EPDM liner into a tubular test section 61 cm (2') in length and 19.1 cm (7.5'') in diameter (ID). A successful effort was made to identify a potential coupling agent to be used to bond the elastomer to the steel tubular wall. This agent was found to withstand the processing conditions associated with curing the elastomer at 288/sup 0/C and to retain a significant level of adhesive strength following hydrothermal testing in a synthetic brine at 260/sup 0/C for a period of 166 hours. Bonding tests were conducted on specimens of mild carbon steel and several alloys including Hastelloy C-276. An objective of the program was to field test the lined section of pipe mentioned above at a geothermal facility in the Imperial Valley. Though a test was conducted, problems encountered during the lining operation precluded an encouraging outcome. The results of the field demonstration were inconclusive. 6 refs., 13 figs., 13 tabs

Hirasuna, A.R.; Davis, D.L.; Flickinger, J.E.; Stephens, C.A.

1987-12-01T23:59:59.000Z

314

Final Scientific - Technical Report, Geothermal Resource Exploration  

Open Energy Info (EERE)

Scientific - Technical Report, Geothermal Resource Exploration Scientific - Technical Report, Geothermal Resource Exploration Program, Truckhaven Area, Imperial County, California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Final Scientific - Technical Report, Geothermal Resource Exploration Program, Truckhaven Area, Imperial County, California Details Activities (5) Areas (1) Regions (0) Abstract: With financial support from the U.S. Department of Energy (DOE), Layman Energy Associates, Inc. (LEA) has completed a program of geothermal exploration at the Truckhaven area in Imperial County, California. The exploratory work conducted by LEA included the following activities: compilation of public domain resource data (wells, seismic data, geologic maps); detailed field geologic mapping at the project site; acquisition and

315

Stanford geothermal program. Final report, July 1990--June 1996  

DOE Green Energy (OSTI)

This report discusses the following: (1) improving models of vapor-dominated geothermal fields: the effects of adsorption; (2) adsorption characteristics of rocks from vapor-dominated geothermal reservoir at the Geysers, CA; (3) optimizing reinjection strategy at Palinpinon, Philippines based on chloride data; (4) optimization of water injection into vapor-dominated geothermal reservoirs; and (5) steam-water relative permeability.

NONE

1998-03-01T23:59:59.000Z

316

Geothermal Electricity Technologies Evaluation Model DOE Tool for Assessing Impact of Research on Cost of Power  

DOE Green Energy (OSTI)

The U.S. Department of Energy (DOE) has developed a spreadsheet model to provide insight as to how its research activities can impact of cost of producing power from geothermal energy. This model is referred to as GETEM, which stands for Geothermal Electricity Technologies Evaluation Model. Based on user input, the model develops estimates of costs associated with exploration, well field development, and power plant construction that are used along with estimated operating costs to provide a predicted power generation cost. The model allows the user to evaluate how reductions in cost, or increases in performance or productivity will impact the predicted power generation cost. This feature provides a means of determining how specific technology improvements can impact generation costs, and as such assists DOE in both prioritizing research areas and identifying where research is needed.

Greg Mines

2008-01-01T23:59:59.000Z

317

DOE Competency Management Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Competency Management Program DOE Competency Management Program DOE Competency Management Program The DOE faces a talent challenge derived from a number of factors including a dynamic operating environment, an anticipated wave of retirements from the workforce, and a projected shortage of workers with needed skills. The Office of the Chief Human Capital Officer (CHCO) is charged with leading the effort to address the talent challenge. The strategic identification, development and use of competencies are key enablers "for strategically aligning the agency's workforce to its missions through effective management of human capital policies and programs." Competency-centric Learning and Development facilitates the selection, development, training, and management of a highly skilled, productive, and diverse workforce.

318

DOE Funds 21 Research, Development and Demonstration Projects for up to $78 Million to Promote Enhanced Geothermal Systems  

Energy.gov (U.S. Department of Energy (DOE))

RENO, Nev. - Today at the National Geothermal Conference in Reno, Nev., Deputy Assistant Secretary for Renewable Energy Steve Chalk announced the U.S. Department of Energy's (DOE) awards under a...

319

Final Scientific / Technical Report, Geothermal Resource Exploration Program, Truckhaven Area, Imperial County, California  

DOE Green Energy (OSTI)

With financial support from the U.S. Department of Energy (DOE), Layman Energy Associates, Inc. (LEA) has completed a program of geothermal exploration at the Truckhaven area in Imperial County, California. The exploratory work conducted by LEA included the following activities: compilation of public domain resource data (wells, seismic data, geologic maps); detailed field geologic mapping at the project site; acquisition and interpretation of remote sensing imagery such as aerial and satellite photographs; acquisition, quality control and interpretation of gravity data; and acquisition, quality control and interpretation of resistivity data using state of the art magnetotelluric (MT) methods. The results of this exploratory program have allowed LEA to develop a structural and hydrologic interpretation of the Truckhaven geothermal resource which can be used to guide subsequent exploratory drilling and resource development. Of primary significance, is the identification of an 8 kilometer-long, WNW-trending zone of low resistivity associated with geothermal activity in nearby wells. The long axis of this low resistivity zone is inferred to mark a zone of faulting which likely provides the primary control on the distribution of geothermal resources in the Truckhaven area. Abundant cross-faults cutting the main WNW-trending zone in its western half may indicate elevated fracture permeability in this region, possibly associated with thermal upwelling and higher resource temperatures. Regional groundwater flow is inferred to push thermal fluids from west to east along the trend of the main low resistivity zone, with resource temperatures likely declining from west to east away from the inferred upwelling zone. Resistivity mapping and well data have also shown that within the WNW-trending low resistivity zone, the thickness of the Plio-Pleistocene sedimentary section above granite basement ranges from 1,9002,600 meters. Well data indicates the lower part of this sedimentary section is sand-rich, suggesting good potential for a sediment-hosted geothermal reservoir in porous sands, similar to other fields in the region such as Heber and East Mesa. Sand porosity may remain higher in the eastern portion of the low resistivity zone. This is based on its location hydrologically downstream of the probable area of thermal upwelling, intense fracture development, and associated pore-filling hydrothermal mineral deposition to the west.

Layman Energy Associates, Inc.

2006-08-15T23:59:59.000Z

320

Report to the Legislature on the California Energy Commission's Geothermal Development Grant Program for Local Governments  

DOE Green Energy (OSTI)

This report documents the California Energy Commission's administration of its Geothermal Development Grant Program for Local Governments. The Energy Commission established this program as a result of the passage of Assembly Bill 1905 (Bosco) in 1980. This legislation established the mechanism to distribute the state's share of revenues received from the leasing of federal mineral reserves for geothermal development. The federal government deposits these revenues in the Geothermal Resources Development Account (GRDA) created by AB 1905. The state allocates funds from the GRDA to the California Parklands and Renewable Resources Investment Fund, the counties of origin where the federal leases are located, and the Energy Commission. The legislation further directs the Energy Commission to disburse its share as grants to local governments to assist with the planning and development of geothermal resources. Activities which are eligible for funding under the Energy Commission's grant program include resource development projects, planning and feasibility studies, and activities to mitigate the impacts of existing geothermal development.

Not Available

1983-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

2010 Annual Progress Report: DOE Hydrogen Program  

DOE Green Energy (OSTI)

In the past year, the DOE Hydrogen Program (the Program) made substantial progress toward its goals and objectives. The Program has conducted comprehensive and focused efforts to enable the widespread commercialization of hydrogen and fuel cell technologies in diverse sectors of the economy. With emphasis on applications that will effectively strengthen our nation's energy security and improve our stewardship of the environment, the Program engages in research, development, and demonstration of critical improvements in the technologies. Highlights of the Program's accomplishments can be found in the sub-program chapters of this report.

Not Available

2011-02-01T23:59:59.000Z

322

DOE Techncial Standards Program Procedures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Revision: 1 Date: August 1, 2000 TECHNICAL STANDARDS PROGRAM TOPICAL COMMITTEES U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1 2. ORGANIZATION OF TOPICAL COMMITTEES............................................................................. 1 2.1 Need........................................................................................................................ 1

323

Geothermal drilling ad completion technology development program. Semi-annual progress report, April-September 1979  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1980-05-01T23:59:59.000Z

324

Geothermal drilling and completion technology development program. Quarterly progress report, January-March 1980  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G. (ed.)

1980-04-01T23:59:59.000Z

325

Geothermal drilling and completion technology development program. Annual progress report, October 1979-September 1980  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G. (ed.)

1980-11-01T23:59:59.000Z

326

Geothermal drilling and completion technology development program. Quarterly progress report, April-June 1980  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are reported. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

Varnado, S.G.

1980-07-01T23:59:59.000Z

327

Geothermal drilling and completion technology development program. Semi-annual progress report, October 1978-March 1979  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drill bits, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1979-09-01T23:59:59.000Z

328

Geothermal drilling and completion technology development program. Quarterly progress report, October-December 1979  

DOE Green Energy (OSTI)

The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

Varnado, S.G. (ed.)

1980-01-01T23:59:59.000Z

329

For DOE Programs | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

DOE Programs DOE Programs Print page Print page Email page Email page DOE Programs fund research and other scientific endeavors. For those activities where the STI is not submitted by National Labs, major sites, or through financial assistance awards, it should be submitted by the DOE Program. Normally, these STI submissions will be submitted via E-Link AN 241.1. Steps Required to Provide STI to DOE Apply for E-Link Access. Questions about E-Link should be directed to OSTI @ 865-576-1333 Identify STI product type to determine whether to provide announcement notice only applicable to copyrighted STI or both announcement notice and full-text document for all full-text documents. Review full-text document for sensitivities listed on AN 241.1 under "Distribution/Access Limitations" and protected personally identifiable

330

Final report for the geothermal well site restoration and plug and abandonment of wells: DOE Pleasant Bayou test site, Brazoria County, Texas  

DOE Green Energy (OSTI)

For a variety of reasons, thousands of oil and gas wells have been abandoned in the Gulf Coast Region of the United States. Many of these wells penetrated geopressured zones whose resource potential for power generation was undervalued or ignored. The U.S. Department of Energy (DOE) Geopressured-Geothermal Research Program was chartered to improve geothermal technology to the point where electricity could be commercially produced from a substantial number of geopressured resource sites. This research program focused on relatively narrow technical issues that are unique to geopressured resources such as the ability to predict reservoir production capacity based on preliminary flow tests. Three well sites were selected for the research program. These are the Willis Hulin and Gladys McCall sites in Louisiana, and the Pleasant Bayou site in Texas. The final phase of this research project consists of plug and abandonment (P&A) of the wells and site restoration.

Rinehart, Ben N.; Seigel, Ben H.

1994-03-13T23:59:59.000Z

331

Geothermal program review 16: Proceedings. A strategic plan for geothermal research  

DOE Green Energy (OSTI)

The proceedings contain 21 papers arranged under the following topical sections: Exploration technology (4 papers); Reservoir technology (5 papers); Energy conversion technology (8 papers); Drilling technology (2 papers); and Direct use and geothermal heat pump technology (2 papers). An additional section contains a report on a workshop on dual-use technologies for hydrothermal and advanced geothermal reservoirs.

NONE

1998-12-31T23:59:59.000Z

332

Benefit-cost analysis of DOE's Current Federal Program to increase hydrothermal resource utilization. Final report  

DOE Green Energy (OSTI)

The impact of DOE's Current Federal Program on the commercialization of hydrothermal resources between 1980 and 2000 is analyzed. The hydrothermal resources of the United States and the types of DOE activities used to stimulate the development of these resources for both electric power and direct heat use are described briefly. The No Federal Program and the Current Federal Program are then described in terms of funding levels and the resultant market penetration estimates through 2000. These market penetration estimates are also compared to other geothermal utilization forecasts. The direct benefits of the Current Federal Program are next presented for electric power and direct heat use applications. An analysis of the external impacts associated with the additional hydrothermal resource development resulting from the Current Federal Program is also provided. Included are environmental effects, national security/balance-of-payments improvements, socioeconomic impacts and materials requirements. A summary of the analysis integrating the direct benefits, external impacts and DOE program costs concludes the report.

Not Available

1981-12-10T23:59:59.000Z

333

DOE Technical Standards Program: Topical Committees  

NLE Websites -- All DOE Office Websites (Extended Search)

Topical Committee Topical Committee Office of Nuclear Safety Internet Linkage for TSP Topical Committees In the interest of optimum technology transfer, the DOE Technical Standards Program (TSP) has set up a network of topical committees. These committees provide a forum for communication across the DOE complex on technical standards related activities. If you would like information about a specific topical committee, or wish to join one of the groups, we've provided a roster of TSP Topical Committees and corresponding Topical Committee Chairpersons. Expectations of DOE Topical Committees The March 9, 1998 memorandum (provided here in web page format) from Rick Serbu, Technical Standards Program (TSP) Manager, EH-31, to J. Robert Wayland, Metrology Topical Committee Secretary, Sandia National Laboratories, discusses general TSP expectations of DOE topical standards committees. This memorandum should be reviewed by all DOE/contractor personnel involved in topical committee activities.

334

DOE O 227.1, Independent Oversight Program  

Directives, Delegations, and Requirements

The order prescribes the requirements and responsibilities for the DOE Independent Oversight Program. Cancels DOE O 470.2B.

2011-08-30T23:59:59.000Z

335

DOE Technical Standards Program Topical Committees, TSPP-9  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-2013 DOE TECHNICAL STANDARDS September 2013 PROGRAM PROCEDURES DOE TECHNICAL STANDARDS PROGRAM TOPICAL COMMITTEES U.S. Department of Energy Office of Nuclear Safety Washington,...

336

FY06 DOE Energy Storage Program PEER Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 DOE Energy Storage and Power Electronics Program (ESPE) PEER Review FY08 DOE Energy Storage and Power Electronics Program (ESPE) PEER Review John D. Boyes Sandia National...

337

FY06 DOE Energy Storage Program PEER Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 DOE Energy Storage Program PEER Review FY07 DOE Energy Storage Program PEER Review John D. Boyes Sandia National Laboratories Mission Mission Develop advanced electricity storage...

338

DOE: Former Worker Medical Screening Program (FWP) | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Former Worker Medical Screening Program (FWP) DOE: Former Worker Medical Screening Program (FWP) Addthis Description FWP provides no-cost medical screenings to all former DOE...

339

DOE INCITE Program Awards Large Allocations at NERSC to Study...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE INCITE Program Awards Large Allocations at NERSC to Study Supernovae, Fusion Energy, Climate Change, Combustion, Chemistry and Accelerator Design DOE INCITE Program Awards...

340

1992--1993 low-temperature geothermal assessment program, Colorada  

DOE Green Energy (OSTI)

Previous assessments of Colorado`s low-temperature geothermal resources were completed by the Colorado Geological Survey in 1920 and in the mid- to late-1970s. The purpose of the 1992--1993 low-temperature geothermal resource assessment is to update the earlier physical, geochemical, and utilization data and compile computerized databases of the location, chemistry, and general information of the low-temperature geothermal resources in Colorado. The main sources of the data included published data from the Colorado Geological Survey, the US Geological Survey WATSTOR database, and the files of the State Division of Water Resources. The staff of the Colorado Geological Survey in 1992 and 1993 visited most of the known geothermal sources that were recorded as having temperatures greater than 30{degrees}C. Physical measurements of the conductivity, pH, temperature, flow rate, and notes on the current geothermal source utilization were taken. Ten new geochemical analyses were completed on selected geothermal sites. The results of the compilation and field investigations are compiled into the four enclosed Quattro Pro 4 databases. For the purposes of this report a geothermal area is defined as a broad area, usually less than 3 sq mi in size, that may have several wells or springs. A geothermal site is an individual well or spring within a geothermal area. The 1992-1993 assessment reports that there are 93 geothermal areas in the Colorado, up from the 56 reported in 1978; there are 157 geothermal sites up from the 125 reported in 1978; and a total of 382 geochemical analyses are compiled, up from the 236 reported in 1978. Six geothermal areas are recommended for further investigation: Trimble Hot Springs, Orvis Hot Springs, an area southeast of Pagosa Springs, the eastern San Luis Valley, Rico and Dunton area, and Cottonwood Hot Springs.

Cappa, J.A.; Hemborg, H.T.

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Program planner's guide to geothermal development in California  

DOE Green Energy (OSTI)

The resource base, status of geothermal development activities, and the state's energy flow are summarized. The present and projected geothermal share of the energy market is discussed. The public and private sector initiatives supporting geothermal development in California are described. These include legislation to provide economic incentives, streamline regulation, and provide planning assistance to local communities. Private sector investment, research, and development activities are also described. The appendices provide a ready reference of financial incentives. (MHR)

Yen, W.W.S.; Chambers, D.M.; Elliott, J.F.; Whittier, J.P.; Schnoor, J.J.; Blachman, S.

1980-09-30T23:59:59.000Z

342

Geothermal Exploration and Assessment Technology Program (review), including a report of the Reservoir Engineering Technical Advisory Group  

DOE Green Energy (OSTI)

The FY 1979 Program, recommended seismic surveys in conjunction with DOE/DGE's industry coupled program in the Northern Basin and Range Province, and the objectives of the Marina del Rey conference are presented. Final reports of six committees which met to define the state-of-the-art in geothermal exploration and to recommend exploration technology development are included. These committees are: structure, stratigraphy, and igneous processes; exploration architecture; electrical methods; seismic methods; thermal methods; water/rock interaction; and reservoir engineering. (MHR)

Nielson, D.L. (ed.)

1979-12-01T23:59:59.000Z

343

A Coordinated Exploration Program for Geothermal Sources on the Island of  

Open Energy Info (EERE)

Exploration Program for Geothermal Sources on the Island of Exploration Program for Geothermal Sources on the Island of Hawaii Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: A Coordinated Exploration Program for Geothermal Sources on the Island of Hawaii Abstract Staff members of the Hawaii Institute of Geophysics carried out an exploration program for geothermal sources on the island of Hawaii by using all relevant geophysical and geochemical methods. Infrared scanning aerial surveys followed by reconnaissance-type electrical surveys and group noise surveys narrowed down the promising area to the east rift of Kilauea. The surveys carried out over the east rift included magnetic, gravity, and electrical surveys by various methods: microearthquake, surveillance, temperature profiling of wells, and chemical analysis of water samples.

344

SaskPower Geothermal and Self-Generated Renewable Power Loan Program (Saskatchewan, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

SaskPower offers a loan program for residential and farm customers who choose to install a Canadian Geoexchange Coalition (CGC) certified geothermal heating and/or a renewable electricity system.

345

Geothermal Literature Review (Laney, 2005) | Open Energy Information  

Open Energy Info (EERE)

Geothermal Literature Review (Laney, 2005) Geothermal Literature Review (Laney, 2005) Exploration Activity Details Location Unspecified Exploration Technique Geothermal Literature Review Activity Date Usefulness not indicated DOE-funding Unknown Notes Field Case Studies, Marcelo Lippmann. This on-going project has collected a large set of publications on EGS activities, particularly in foreign geothermal fields, continues to search for news on current projects and on plans for future EGS activities. Information has been e-mailed to DOE and U.S. geothermal organizations like the Geothermal Energy Association, the Geothermal Resources Council and DOE contractors. References Patrick Laney (2005) Federal Geothermal Research Program Update - Fiscal Year 2004 Retrieved from "http://en.openei.org/w/index.php?title=Geothermal_Literature_Review_(Laney,_2005)&oldid=510792"

346

Fiscal Year 1992 Annual Operating Plan for the Geopressured-Geothermal Research Program ($4.3 Million Budget)  

Science Conference Proceedings (OSTI)

This plan describes the Geopressured-Geothermal Research Program. A Geopressured well in Texas (Pleasant Bayou) will undergo a slow test and a pressure buildup test. A geopressured well in Louisiana (Gladys McCall) will be flow tested for a short period, logged, plugged and abandoned or turned over to industry early in FY 92. A second deep geopressured well in Louisiana, the Hulin Well, is being kept on standby. Related university research in geology, numerical reservoir modeling, subsidence, microseismicity, and water quality will continue, with program data reviews initiated in appropriate areas. Increased emphasis on integrated reservoir engineering will be implemented. The well activities coupled with the related university research are designed to improve the ability to forecast reservoir productive capacity, to verify the reliability of the resource as a long-term energy resource, and to determine the environmental effects of long-term production. By these means, the Geopressured-Geothermal Research Program is developing a solid technology base that private industry can use to evaluate the geopressured-geothermal resource. The Industrial Consortium for utilization of the resource will be continued. Use projects in Louisiana and Texas will be evaluated. A geopressured reservoir review will be managed by INEL. The DOE Field Office, Idaho will make preparations to complete the program. [DJE-2005

None

1991-08-01T23:59:59.000Z

347

DOE Manual - Advisory Committee Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANUAL MANUAL DOE M 515.1-1 Approved: 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM U.S. DEPARTMENT OF ENERGY Office of Management AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Management i DOE M 515.1-1 10-22-07 ADVISORY COMMITTEE MANAGEMENT PROGRAM 1. PURPOSE. This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum requirements for Federal agencies to manage and administer advisory committees. The Manual provides detailed Department of Energy (DOE or Department)

348

DOE Challenge Home, California Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

349

NEPA COMPLIANCE SURVEY Project Information Project TitJe: Geothermal Technologies Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Information Project TitJe: Geothermal Technologies Program Date: 12-11-()9 DOE Code: 6730.020.61041 Contractor Code: Project Lead: Project Overview This NEPA is for the laying of a 2,975 foot, 8" welded plastic water line from Little Teapot Creek near in the 1. What are the environmental impacts? intersection with Teapot Creek to the North Waterflood Facility (NWF) building. The entire project area is within Section 21 T39N R78W (map attached) and will not impact any wet land areas but will cross one 2. What is the legal location? intermittent stream. The stream is presently dry. The project will include the clearing of vegetation from a 12 3. What is the duration of the project? foot wide construction corridor along the route, digging a 5 foot deep trench, welding and placing the plastic

350

2008 Geothermal Technologies Market Report  

Science Conference Proceedings (OSTI)

This report describes market-wide trends for the geothermal industry throughout 2008 and the beginning of 2009. It begins with an overview of the U.S. DOE's Geothermal Technology Program's (GTP's) involvement with the geothermal industry and recent investment trends for electric generation technologies. The report next describes the current state of geothermal power generation and activity within the United States, costs associated with development, financing trends, an analysis of the levelized cost of energy (LCOE), and a look at the current policy environment. The report also highlights trends regarding direct use of geothermal energy, including geothermal heat pumps (GHPs). The final sections of the report focus on international perspectives, employment and economic benefits from geothermal energy development, and potential incentives in pending national legislation.

Cross, J.; Freeman, J.

2009-07-01T23:59:59.000Z

351

1996 DOE technical standards program workshop: Proceedings  

SciTech Connect

The workshop theme is `The Strategic Standardization Initiative - A Technology Exchange and Global Competitiveness Challenge for DOE.` The workshop goal is to inform the DOE technical standards community of strategic standardization activities taking place in the Department, other Government agencies, standards developing organizations, and industry. Individuals working on technical standards will be challenged to improve cooperation and communications with the involved organizations in response to the initiative. Workshop sessions include presentations by representatives from various Government agencies that focus on coordination among and participation of Government personnel in the voluntary standards process; reports by standards organizations, industry, and DOE representatives on current technology exchange programs; and how the road ahead appears for `information superhighway` standardization. Another session highlights successful standardization case studies selected from several sites across the DOE complex. The workshop concludes with a panel discussion on the goals and objectives of the DOE Technical Standards Program as envisioned by senior DOE management. The annual workshop on technical standards has proven to be an effective medium for communicating information related to standards throughout the DOE community. Technical standards are used to transfer technology and standardize work processes to produce consistent, acceptable results. They provide a practical solution to the Department`s challenge to protect the environment and the health and safety of the public and workers during all facility operations. Through standards, the technologies of industries and governments worldwide are available to DOE. The DOE Technical Standards Program, a Department-wide effort that crosscuts all organizations and disciplines, links the Department to those technologies.

NONE

1996-07-01T23:59:59.000Z

352

DOE battery program for weapon applications  

SciTech Connect

This report discusses the Department of Energy (DOE) Weapons Battery program which originates from Sandia National Laboratories (SNL) and involves activities ranging from research, design and development to testing, consulting and production support. The primary customer is the DOE/Office of Defense Programs, although work is also done for various Department of Defense agencies and their contractors. The majority of the SNL activities involve thermal battery (TB) and lithium ambient temperature battery (LAMB)technologies. Smaller efforts are underway in the areas of silver oxide/zinc and nickel oxide/cadmium batteries as well as double layer capacitors.

Clark, R.P.; Baldwin, A.R.

1992-11-01T23:59:59.000Z

353

DOE battery program for weapon applications  

SciTech Connect

This report discusses the Department of Energy (DOE) Weapons Battery program which originates from Sandia National Laboratories (SNL) and involves activities ranging from research, design and development to testing, consulting and production support. The primary customer is the DOE/Office of Defense Programs, although work is also done for various Department of Defense agencies and their contractors. The majority of the SNL activities involve thermal battery (TB) and lithium ambient temperature battery (LAMB)technologies. Smaller efforts are underway in the areas of silver oxide/zinc and nickel oxide/cadmium batteries as well as double layer capacitors.

Clark, R.P.; Baldwin, A.R.

1992-01-01T23:59:59.000Z

354

DOE Technical Standards Program Standards Actions Newsletter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* * New DOE Standard, Communicating Waste Characterization and DOT Hazard Classification Requirements * Workshops and Events * The Annual Energy Facility Contractors Group Safety Analysis Workshop * 2012 Chemical Safety and Life Cycle Management Workshop * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE April 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ New DOE Standard, Communicating Waste Characterization and DOT Hazard Classification Requirements The Department of Energy (DOE) Office of Environmental Management (EM) has a challenging mission to solve many problems posed by the legacy of the Cold War, including the transportation of unprecedented amounts of contaminated waste,

355

Enhanced Geothermal Systems (EGS) R&D Program: US Geothermal Resources Review and Needs Assessment  

DOE Green Energy (OSTI)

The purpose of this report is to lay the groundwork for an emerging process to assess U.S. geothermal resources that might be suitable for development as Enhanced Geothermal Systems (EGS). Interviews of leading geothermists indicate that doing that will be intertwined with updating assessments of U.S. higher-quality hydrothermal resources and reviewing methods for discovering ''hidden'' hydrothermal and EGS resources. The report reviews the history and status of assessment of high-temperature geothermal resources in the United States. Hydrothermal, Enhanced, and Hot Dry Rock resources are addressed. Geopressured geothermal resources are not. There are three main uses of geothermal resource assessments: (1) They inform industry and other interest parties of reasonable estimates of the amounts and likely locations of known and prospective geothermal resources. This provides a basis for private-sector decisions whether or not to enter the geothermal energy business at all, and for where to look for useful resources. (2) They inform government agencies (Federal, State, local) of the same kinds of information. This can inform strategic decisions, such as whether to continue to invest in creating and stimulating a geothermal industry--e.g., through research or financial incentives. And it informs certain agencies, e.g., Department of Interior, about what kinds of tactical operations might be required to support such activities as exploration and leasing. (3) They help the experts who are performing the assessment(s) to clarify their procedures and data, and in turn, provide the other two kinds of users with a more accurate interpretation of what the resulting estimates mean. The process of conducting this assessment brings a spotlight to bear on what has been accomplished in the domain of detecting and understanding reservoirs, in the period since the last major assessment was conducted.

Entingh, Dan; McLarty, Lynn

2000-11-30T23:59:59.000Z

356

An overview of DOE`s wind turbine development programs  

DOE Green Energy (OSTI)

The development of technologically advanced, higher efficiency wind turbines continues to be a high priority activity of the US wind industry. The United States Department of Energy (DOE) is conducting and sponsoring a range of programs aimed at assisting the wind industry with system design, development, and testing. The overall goal is to develop systems that can compete with conventional electric generation for $.05/kWh at 5.8 m/s (13 mph sites) by the mid-1990s and with fossil-fuel-based generators for $.04/kWh at 5.8 m/s sites by the year 2000. These goals will be achieved through several programs. The Value Engineered Turbine Program will promote the rapid development of US capability to manufacture wind turbines with known and well documented records of performance, cost, and reliability, to take advantage of near-term market opportunities. The Advanced Wind Turbine Program will assist US industry to develop and integrate innovative technologies into utility-grade wind turbines for the near-term (mid 1990s) and to develop a new generation of turbines for the year 2000. The collaborative Electric Power Research Institute (EPRI)/DOE Utility Wind Turbine Performance Verification Program will deploy and evaluate commercial-prototype wind turbines in typical utility operating environments, to provide a bridge between development programs currently underway and commercial purchases of utility-grade wind turbines. A number of collaborative efforts also will help develop a range of small systems optimized to work in a diesel hybrid environment to provide electricity for smaller non-grid-connected applications.

Laxson, A; Dodge, D; Flowers, L [National Renewable Energy Lab., Golden, CO (United States); Loose, R; Goldman, P [Dept. of Energy, Washington, DC (United States)

1993-09-01T23:59:59.000Z

357

Geothermal Information Dissemination and Outreach  

SciTech Connect

Project Purpose To enhance technological and topical information transfer in support of industry and government efforts to increase geothermal energy use in the United States (power production, direct use, and geothermal groundsource heat pumps). Project Work GRC 2003 Annual Meeting. The GRC convened the meeting on Oct. 12-15, 2003, at Morelia's Centro de Convenciones y ExpoCentro in Mexico under the theme, International Collaboration for Geothermal Energy in the Americas. The event was also sponsored by the Comision Federal de Electricidad. ~600 participants from more than 20 countries attended the event. The GRC convened a Development of Geothermal Projects Workshop and Geothermal Exploration Techniques Workshop. GRC Field Trips included Los Azufres and Paricutin Volcano on Oct. 11. The Geothermal Energy Association (Washington, DC) staged its Geothermal Energy Trade Show. The Annual Meeting Opening Session was convened on Oct. 13, and included the governor of Michoacan, the Mexico Assistant Secretary of Energy, CFE Geothermal Division Director, DOE Geothermal Program Manager, and private sector representatives. The 2003 Annual Meeting attracted 160 papers for oral and poster presentations. GRC 2004. Under the theme, Geothermal - The Reliable Renewable, the GRC 2004 Annual Meeting convened on Aug. 29-Sept. 1, 2004, at the Hyatt Grand Champions Resort at Indian Wells, CA. Estimated total attendance (including Trade Show personnel, guests and accompanying persons) was ~700. The event included a workshop, Geothermal Production Well Pump Installation, Operation and Maintenance. Field trips went to Coso/Mammoth and Imperial Valley/Salton Sea geothermal fields. The event Opening Session featured speakers from the U.S. Department of Energy, U.S. Department of the Interior, and the private sector. The Geothermal Energy Association staged its Geothermal Energy Trade Show. The Geothermal Education Office staged its Geothermal Energy Workshop. Several local radio and TV station interviews were conducted during the event. Technical Program included 136 technical papers. All were published in Volume 28 of the GRC Transactions. Volume 28, GRC Transactions Pblished as a high-quality, durable casebound volume, Volume 28 of the Transactions published 119 out of 136 technical papers (692 pp) presented at the GRC 2004 Annual Meeting. The papers were submitted by geothermal experts and professionals from around the world. The papers were reviewed over a 2-day period by 25 volunteer (in-kind) geothermal experts from the private sector and DOE National Laboratories. GRC staff received and cataloged the papers, and maintained interaction with authors for revisions and corrections. DOE Geothermal Technologies Newsletter The Office of Geothermal Technologies quarterly newsletter, Geothermal Technologies, is produced at the National Renewable Energy Laboratory (NREL). This 2-color, 4- to 16-page newsletter summarizes federal geothermal research and development projects and other DOE geothermal news. The GRC receives newsletter disk copy and color-key proof from NREL for each newsletter, then follows through with print production and distribution. Circulation is 1,000 per issue (plus 300 copies of the newsletter shipped to NREL for internal and public distribution). During the project period, the GRC printed, stitched and bound the Geothermal Technologies newsletter into the Sept/Oct 2003, Jan/Feb 2004, and May/June 2004 editions of the GRC Bulletin. Multiple copies (300) of the newsletter sans magazine were provided to NREL for internal DOE distribution. GRC Geothermal Research Library The GRC has built the largest and most comprehensive library in the world devoted to geothermal energy. The GRC Geothermal Library provides rapid accessibility to the majority of technical literature crafted over the past 30 years, and preserves hard copy and on-line databases for future use by geothermal researchers and developers. A bibliography for over half of the physical library's citations is available through keyword search on the GRC web site (www.geothe

Ted J. Clutter, Geothermal Resources Council Executive Director

2005-02-18T23:59:59.000Z

358

DOE's Round Robin Test Program FAQ Sheet  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Frequently Asked Questions for: Frequently Asked Questions for: DOE's Round Robin Test Program May 2011 i Table of Contents Introduction ........................................................................................................................................ 1 What products will be tested? .......................................................................................................... 1 What is the testing process? .............................................................................................................. 1 What labs can participate in testing? ............................................................................................... 2 Who pays for the testing? ................................................................................................................. 2

359

Testing geopressured geothermal reservoirs in existing wells. Wells of Opportunity Program final contract report, 1980-1981  

DOE Green Energy (OSTI)

The geopressured-geothermal candidates for the Wells of Opportunity program were located by the screening of published information on oil industry activity and through direct contact with the oil and gas operators. This process resulted in the recommendation to the DOE of 33 candidate wells for the program. Seven of the 33 recommended wells were accepted for testing. Of these seven wells, six were actually tested. The first well, the No. 1 Kennedy, was acquired but not tested. The seventh well, the No. 1 Godchaux, was abandoned due to mechanical problems during re-entry. The well search activities, which culminated in the acceptance by the DOE of 7 recommended wells, were substantial. A total of 90,270 well reports were reviewed, leading to 1990 wells selected for thorough geological analysis. All of the reservoirs tested in this program have been restricted by one or more faults or permeability barriers. A comprehensive discussion of test results is presented.

Not Available

1982-01-01T23:59:59.000Z

360

Site specific analysis of geothermal development. Volume 1. Summary report  

SciTech Connect

MITRE/Metrek has analyzed development scenarios for 37 hydrothermal and geopressured prospects in the United States to assist DOE's Division of Geothermal Energy in mission-oriented planning of geothermal resource development. A summary of the site-specific analyses is presented with particular emphasis on possible recommendations for the Federal Geothermal Program.

Leigh, J.; Cohen, A.; Jacobsen, W.; Trehan, R.

1978-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

FY06 DOE Energy Storage Program PEER Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 DOE Energy Storage Program PEER REVIEW John D. Boyes Sandia National Laboratories ESS Program Makeup ESS Base Program - CECDOE Data Acquisition and Project Support - NYSERDADOE...

362

ESS 2012 Peer Review - DOE Smart Grid Demonstration Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration Program Smart Grid Energy Storage Demonstrations Overview Ron Staubly - National Energy Technology Laboratory DOE Smart Grid Demonstration Program The Program At a...

363

DOE-STD-3022-98; DOE Standard DOE HEPA Filter Test Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22-98 22-98 May 1998 Superseding DOE NE F 3-42 January 1987 DOE STANDARD DOE HEPA FILTER TEST PROGRAM U.S. Department of Energy FSC 4460 Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. Order No. DE98001294 DOE-STD-3022-98 iii FOREWORD 1. This Department of Energy (DOE) Standard is approved for use by all DOE components and contractors.

364

DOE Technical Standards Program Overview and Responsibilities, TSPP-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-TSPP-1-2013 DOE-TSPP-1-2013 DOE TECHNICAL STANDARDS September 2013 PROGRAM PROCEDURES DOE TECHNICAL STANDARDS PROGRAM OVERVIEW AND RESPONSIBILITIES U.S. Department of Energy Office of Nuclear Safety Washington, D.C. 2058 DOE-TSPP-1-2013 Overview and Responsibilities September 2013 DOE Technical Standards Program CONTENTS 1. SCOPE ............................................................................................................................................ 1 1.1 Purpose ....................................................................................................................... 1 1.2 Applicability ................................................................................................................. 1 2. PROGRAM OVERVIEW ................................................................................................................. 1

365

DOE Challenge Home, Washington Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled home. Modeling is not required, but no tradeoffs are allowed. Follow these steps to use the prescriptive path:

366

DOE-2 building energy analysis computer program  

SciTech Connect

Concern with energy conservation requirements has resulted in a growing awareness throughout the architectural/engineering community of the need for an easy-to-use, fast-running, completely documented, public-domain computer program for the energy-use analysis of buildings. DOE-2 has been developed to meet these needs. The program emphasizes ease of input, efficiency of computation, flexibility of operation, and usefulness of output. A key factor in meeting these requirements has been achieved by the development of a free-format Building Design Language (BDL) that greatly facilitates the user's task in defining the building; its heating, ventilating, and air conditioning (HVAC) systems; and its operation. The DOE-2 program is described.

Hunn, B.D.

1979-01-01T23:59:59.000Z

367

The DOE/NREL Environmental Science Program  

DOE Green Energy (OSTI)

This paper summarizes the several of the studies in the Environmental Science Program being sponsored by DOE's Office of Heavy Vehicle Technologies (OHVT) through the National Renewable Energy Laboratory (NREL). The goal of the Environmental Science Program is to understand atmospheric impacts and potential health effects that may be caused by the use of petroleum-based fuels and alternative transportation fuels from mobile sources. The Program is regulatory-driven, and focuses on ozone, airborne particles, visibility and regional haze, air toxics, and health effects of air pollutants. Each project in the Program is designed to address policy-relevant objectives. Current projects in the Environmental Science Program have four areas of focus: improving technology for emissions measurements; vehicle emissions measurements; emission inventory development/improvement; ambient impacts, including health effects.

Douglas R. Lawson; Michael Gurevich

2001-05-14T23:59:59.000Z

368

National Earth Comfort Program, Geothermal Heat Pump Market Mobilization and Technology Demonstration  

DOE Green Energy (OSTI)

Late 1994, the Geothermal Heat Pump Consortium (GHPC) was launched as a non-profit collaborative effort between the United States Department of Energy, US electric utilities and the GeoExchange (geothermal heat pump) industry to make ''geothermal heat pumps'' a significant component of the HVAC industry and avoid 1.5 million metric tons of carbon equivalent per year. The goal was to create a self-sustainable GeoExchange market. This report offers a summary of some of the lessons learned and an overview of some of the programs major accomplishments.

Wael M. El-Sharif

2001-04-30T23:59:59.000Z

369

Geothermal injection technology program. Annual progress report, FY-85  

DOE Green Energy (OSTI)

This report summarizes injection research conducted during FY-1985. The objective was to develop a better understanding of the migration and impact of fluids injected in geothermal reservoirs. Separate abstracts have been prepared for individual project summaries. (ACR)

Not Available

1986-02-01T23:59:59.000Z

370

Navy's Geothermal Program Office: Overview of Recovery Act (ARRA...  

Open Energy Info (EERE)

Air Station Area (Sabin, Et Al., 2010) Field Mapping At Coso Geothermal Area (2010) LiDAR At Twenty-Nine Palms Area (Sabin, Et Al., 2010) Slim Holes At Hawthorne Area (Sabin,...

371

Geothermal grant program for local governments: revised grant application manual  

DOE Green Energy (OSTI)

This revised grant application manual describes the kinds of activities eligible for geothermal grants, who may apply, and how to apply. It also describes the criteria and procedures the California Energy Commission will use in selecting proposals for grant awards.

Not Available

1983-03-01T23:59:59.000Z

372

Mexican--American cooperative program at the Cerro Prieto Geothermal Field  

DOE Green Energy (OSTI)

The Cerro Prieto project incorporates studies of the geologic, hydrogeologic, geochemical, and geophysical setting of the geothermal field as well as its structural, reservoir engineering, and subsidence characteristics. A description of the activities involved in each part of this cooperative program is presented. Text of the agreement between the Comision Federal de Electricidad of Mexico and the USERDA for the cooperative study of the Cerro Prieto geothermal field is included.

Witherspoon, P.A.; Espinosa, H.A.; Lippmann, M.J.; Mercado, A.M.; Wollenberg, H.A.

1978-08-01T23:59:59.000Z

373

Hydraulic fracture stimulation treatment of Well Baca 23. Geothermal Reservoir Well-Stimulation Program  

DOE Green Energy (OSTI)

Well Stimulation Experiment No. 5 of the Geothermal Reservoir Well Stimulation Program (GRWSP) was performed on March 22, 1981 in Baca 23, located in Union's Redondo Creek Project Area in Sandoval County, New Mexico. The treatment selected was a large hydraulic fracture job designed specifically for, and utilizing frac materials chosen for, the high temperature geothermal environment. The well selection, fracture treatment, experiment evaluation, and summary of the job costs are presented herein.

Not Available

1981-06-01T23:59:59.000Z

374

DOE (Department of Energy) Epidemiologic Research Program  

SciTech Connect

The objective of the Department of Energy (DOE) Epidemiologic Research Program is to determine the human health effects resulting from the generation and use of energy, and of the operation of DOE facilities. The program is divided into seven general areas of activity; the Radiation Effects Research Foundation (RERF) which supports studies of survivors of the atomic weapons in Hiroshima and Nagasaki, mortality and morbidity studies of DOE workers, studies on internally deposited alpha emitters, medical/histologic studies, studies on the aspects of radiation damage, community health surveillance studies, and the development of computational techniques and of databases to make the results as widely useful as possible. Excluding the extensive literature from the RERF, the program has produced 340 publications in scientific journals, contributing significantly to improving the understanding of the health effects of ionizing radiation exposure. In addition, a large number of public presentations were made and are documented elsewhere in published proceedings or in books. The purpose of this bibliography is to present a guide to the research results obtained by scientists supported by the program. The bibliography, which includes doctoral theses, is classified by laboratory and by year and also summarizes the results from individual authors by journal.

Not Available

1990-01-01T23:59:59.000Z

375

Colorado geothermal commercialization program: community development of geothermal energy in Pagosa Springs, Colorado  

DOE Green Energy (OSTI)

A district heating system for the Pagosa Springs central business district is in the planning stage. A detailed analysis of the project is presented. It comprises area and site specific studies and describes in detail the recent, current, anticipated, and postulated geothermal development activities. (MHR)

Coe, B.A.

1980-01-01T23:59:59.000Z

376

Geothermal Technologies Office: Electricity Generation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

377

Final Technical Report, Geothermal Resource Evaluation And Definitioni  

Open Energy Info (EERE)

Technical Report, Geothermal Resource Evaluation And Definitioni Technical Report, Geothermal Resource Evaluation And Definitioni (Gred) Program-Phases I, Ii, And Iii For The Animas Valley, Nm Geothermal Resource Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Final Technical Report, Geothermal Resource Evaluation And Definitioni (Gred) Program-Phases I, Ii, And Iii For The Animas Valley, Nm Geothermal Resource Details Activities (9) Areas (1) Regions (0) Abstract: This report contains a detailed summary of a methodical and comprehensive assessment of the potential of the Animas Valley, New Mexico geothermal resource leasehold owned by Lightning Dock Geothermal, Inc. Work described herein was completed under the auspices of the Department of Energy (DOE) Cooperative Agreement DE-FC04-00AL66977, Geothermal Resource

378

Geothermal resource data base: Arizona  

DOE Green Energy (OSTI)

This report provides a compilation of geothermal well and spring information in Arizona up to 1993. This report and data base are a part of a larger congressionally-funded national effort to encourage and assist geothermal direct-use. In 1991, the US Department of Energy, Geothermal Division (DOE/GD) began a Low-Temperature Geothermal Resources and Technology Transfer Program. Phase 1 of this program includes updating the inventory of wells and springs of ten western states and placing these data into a digital format that is universally accessible to the PC. The Oregon Institute of Technology GeoHeat Center (OIT) administers the program and the University of Utah Earth Sciences and Resources Institute (ESRI) provides technical direction. In recent years, the primary growth in geothermal use in Arizona has occurred in aquaculture. Other uses include minor space heating and supply of warm mineral waters for health spas.

Witcher, J.C. [New Mexico State Univ., Las Cruces, NM (United States). Southwest Technology Development Inst.

1995-09-01T23:59:59.000Z

379

Energia geotermica at the present time: Geothermal Today (Spanish version); La energia geotermica en la actualidad  

DOE Green Energy (OSTI)

This outreach publication highlights federal program milestones and accomplishments of the DOE Geothermal Technologies Program for 2003. This is a special 8-page Spanish supplement for the audience at the Geothermal Resources Council/Geothermal Energy Association Annual Meeting and Industry Exhibit, Morelia, Mexico.

Not Available

2003-09-01T23:59:59.000Z

380

DOE-TSPP-9-2013, DOE Technical Standards Program Topical Committees |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-2013, DOE Technical Standards Program Topical Committees 9-2013, DOE Technical Standards Program Topical Committees DOE-TSPP-9-2013, DOE Technical Standards Program Topical Committees Technical Standards Program Procedures (TSPP) - September 16, 2013 This procedure describes how topical committees are organized and recognized under the Technical Standards Program. This procedure applies to all Department of Energy (DOE) Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as TSP participants) working to the latest revision of DOE Order (O) 252.1A, Technical Standards Program. DOE-TSPP-9-2013, DOE Technical Standards Program Topical Committees More Documents & Publications TECHNICAL STANDARDS PROGRAM TOPICAL COMMITTEES DOE-TSPP-8-2013, Converting DOE Technical Standards to Voluntary Consensus

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE Extends Public Comment Period for Uranium Program Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement DOE Extends Public Comment Period for Uranium...

382

Federal Energy Management Program: DOE Enhances Management of...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Renewable Energy Federal Energy Management Program DOE Enhances Management of Energy Savings Performance Contracts U.S. Department of Energy (DOE) Assistant Secretary...

383

Use of program GEOTHM to design and optimize geothermal power cycles  

SciTech Connect

The Lawrence Berkeley Laboratory program GEOTHM has been under development for nearly two years. GEOTHM will design and optimize a wide variety of thermodynamic cycles. The most recent improvements in the GEOTHM program are included. These improvements include: a model for concentrated saline brines and a single step cycle optimization process. Geothermal power cycles are given as examples.

Pines, H.S.; Green, M.A.

1976-06-01T23:59:59.000Z

384

Past DOE Technical Standards Program Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Past DOE Technical Standards Program Procedures Past DOE Technical Standards Program Procedures Past DOE Technical Standards Program Procedures TSPP July 2009 September 26, 2009 DOE-TSPP-0, Technical Standards Program Procedures - July 1, 2009 This document is the summary page for all of the DOE Technical Standards Program Procedures. August 26, 2009 DOE-TSPP-1, Technical Standards Program Responsibilities - July 1, 2009 This procedure describes the responsibilities of persons who are charged with implementing the DOE Technical Standards Program. August 26, 2009 DOE-TSPP-2, Establishing the Need for a Technical Standard - July 1, 2009 This procedure provides guidance for the routine maintenance of DOE Technical Standards. August 26, 2009 DOE-TSPP-3, Use of Non-Government Standards and Interaction with Non-Government Standards Bodies - July 1, 2009

385

Community Geothermal Technology Program: Experimental lumber drying kiln. Final report  

DOE Green Energy (OSTI)

Goals were to demonstrate feasibility of using the geothermal waste effluent from the HGP-A well as a heat source for a kiln operation to dry hardwoods, develop drying schedules, and develop automatic systems to monitor/control the geothermally heated lumber dry kiln systems. The feasibility was demonstrated. Lumber was dried in periods of 2 to 6 weeks in the kiln, compared to 18 months air drying and 6--8 weeks using a dehumidified chamber. Larger, plate-type heat exchangers between the primary fluid and water circulation systems may enable the kiln to reach the planned temperatures (180--185 F). However, the King Koa partnership cannot any longer pursue the concept of geothermal lumber kilns.

Leaman, D.; Irwin, B.

1989-10-01T23:59:59.000Z

386

DOE | OpenEI Community  

Open Energy Info (EERE)

DOE DOE Home DOE Wind Vision Community Description: The DOE Wind Program, in close cooperation with the wind industry, is launching a new initiative to revisit the findings of the 2008 DOE 20% The DOE Wind Program, in close cooperation with the wind industry, is launching a new initiative to revisit the findings of the 2008 DOE 20% Wind Energy by 2030 report, and to develop a renewed vision for U.S. wind power research, development, and deployment. Included in this effort will be: community DOE forum Wind Graham7781's picture Submitted by Graham7781(1992) Super contributor 26 April, 2013 - 11:05 OpenEI Showcased in Geothermal Exploration Best Practices Workshop DOE geothermal GTO OpenEI This week, Denver hosted the US DOE Geothermal Technologies Office (GTO) 2013 Peer Review. The purpose of the peer review is to offer geothermal

387

Summary and results of the comprehensive environmental monitoring program at the INEL's Raft River geothermal site  

DOE Green Energy (OSTI)

The Raft River Geothermal Program was designed to demonstrate that moderate temperature (approx. 150/sup 0/C) geothermal fluids could be used to generate electricity and provide an alternate energy source for direct-use applications. The environmental program was initiated soon after drilling began. The major elements of the monitoring program were continued during the construction and experimental testing of the 5-MW(e) power plant. The monitoring studies established pre-development baseline conditions of and assessed changes in the physical, biological, and human environment. The Physical Environmental Monitoring Program collected baseline data on geology, subsidence, seismicity, meteorology and air quality. The Biological Environmental Monitoring Program collected baseline data on the flora and fauna of the terrestrial ecosystem, studied raptor disturbances, and surveyed the aquatic communities of the Raft River. The Human Environmental Monitoring Program surveyed historic and archaeological sites, considered the socioeconomic environment, and documented incidences of fluorosis in the Raft River Valley. In addition to the environmental monitoring programs, research on biological direct applications using geothermal water was conducted at Raft River. Areas of research included biomass production of wetland and tree species, aquaculture, agricultural irrigation, and the use of wetlands as a treatment or pretreatment system for geothermal effluents.

Mayes, R.A.; Thurow, T.L.; Cahn, L.S.

1982-01-01T23:59:59.000Z

388

DOE Technical Standards Program: Recently Approved DOE Technical...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recently Approved DOE Technical Standards Office of Nuclear Safety This page lists DOE technical standards that have been approved and added to the distribution. If they are...

389

Support services relating to geothermal programs. Final report  

DOE Green Energy (OSTI)

Activities designed to assist in the assessment of processes through which geopressured methane production and geopressure-geothermal power can be increased are discussed. Progress is reported on the following: general support, hot-dry-rock review, R and D plan, and the Edna Delcambre final report. (MHR)

Not Available

1981-08-01T23:59:59.000Z

390

Community Geothermal Technology Program: Silica bronze project. Final report  

DOE Green Energy (OSTI)

Objective was to incorporate waste silica from the HGP-A geothermal well in Pohoiki with other refractory materials for investment casting of bronze sculpture. The best composition for casting is about 50% silica, 25% red cinders, and 25% brick dust; remaining ingredient is a binder, such as plaster and water.

Bianchini, H.

1989-10-01T23:59:59.000Z

391

Community Geothermal Technology Program: Hawaii glass project. Final report  

DOE Green Energy (OSTI)

Objective was to develop a glass utilizing the silica waste material from geothermal energy production, and to supply local artists with this glass to make artistic objects. A glass composed of 93% indigenous Hawaiian materials was developed; 24 artists made 110 objects from this glass. A market was found for art objects made from this material.

Miller, N. [comp.; Irwin, B.

1988-01-20T23:59:59.000Z

392

Geothermal Energy Research, Development and Demonstration Program. First annual report  

DOE Green Energy (OSTI)

The following are discussed: program achievements and progress, interagency coordination and program management, international cooperation program, non-federal activities, and future program plans. (MHR)

Not Available

1977-04-01T23:59:59.000Z

393

DOE's Round Robin Test Program FAQ Sheet | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Round Robin Test Program FAQ Sheet DOE's Round Robin Test Program FAQ Sheet This document is the May 2011 version of the Frequently Asked Questions about the US Department of...

394

Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration  

DOE Green Energy (OSTI)

The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1 well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.

John, C.J.; Maciasz, G.; Harder, B.J.

1998-06-01T23:59:59.000Z

395

Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE 33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This module is divided into three sections. Section one contains the objective, general requirements, and the responsibilities assigned to field element managers. Section two includes the requirements in attachment 2 of the Order, Maintenance Management Program Requirements for DOE Nuclear Facilities. Section three is a summary of the guidance provided in DOE G 433.1-1, Facility Maintenance Management Program Guide for Use with DOE O 433.1.The

396

DOE O 361.1B, Acquisition Career Management Program  

Directives, Delegations, and Requirements

The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels ...

2008-01-24T23:59:59.000Z

397

Table of Contents, excerpt from 2007 DOE Hydrogen Program Annual...  

NLE Websites -- All DOE Office Websites (Extended Search)

.D Catalysis (Continued) Table of Contents x DOE Hydrogen Program FY 2007 Annual Progress Report V .L Innovative Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

398

DOE O 544.1, Priorities and Allocations Program  

Directives, Delegations, and Requirements

The Order establishes responsibilities for administration of the DOE and NNSA priorities and allocations program for industrial products, materials, and ...

2004-10-12T23:59:59.000Z

399

Summary of geothermal studies in Montana, 1980 through 1983. DOE final report  

DOE Green Energy (OSTI)

The geology, hydrology, and surface manifestations of geothermal systems in Montana are described by area. Water-quality information, tables of inventory and water analysis data for springs and wells, and a geothermal resource map are included. (MHR)

Sonderegger, J.L.

1984-01-01T23:59:59.000Z

400

Geothermal Literature Review At International Geothermal Area, Iceland  

Open Energy Info (EERE)

Geothermal Literature Review At International Geothermal Area, Iceland Geothermal Literature Review At International Geothermal Area, Iceland (Ranalli & Rybach, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermal Literature Review At International Geothermal Area, Iceland (Ranalli & Rybach, 2005) Exploration Activity Details Location International Geothermal Area Iceland Exploration Technique Geothermal Literature Review Activity Date Usefulness not indicated DOE-funding Unknown Notes Hvalfjordur Fjord area, re: Heat flow References G. Ranalli, L. Rybach (2005) Heat Flow, Heat Transfer And Lithosphere Rheology In Geothermal Areas- Features And Examples Retrieved from "http://en.openei.org/w/index.php?title=Geothermal_Literature_Review_At_International_Geothermal_Area,_Iceland_(Ranalli_%26_Rybach,_2005)&oldid=510812

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Preliminary test results and geology of the DOE/Superior Hulin. number sign. 1 geopressured-geothermal well, Vermillion Parish, Louisiana  

Science Conference Proceedings (OSTI)

The DOE/Superior Hulin {number sign}1 well is the most recent of the current three geopressured-geothermal prospects being tested by the Department of Energy (DOE) under its geopressured-geothermal program initiated in 1975. The other prospects under evaluation are Gladys McCall {number sign}1 (Cameron Parish, LA) and Pleasant Bayou {number sign}2 (Brazoria County, TX). The main objective of this research program is to evaluate the commercial viability of energy production from high temperature (275{degrees}+F.), geopressured, natural-gas-saturated brine sandstone aquifers occur-ring in the Gulf Coast area. The DOE/Superior Hulin {number sign}1 well is located 7.5 mi (12 km) south of the town of Erath, Louisiana. It was originally drilled and later sidetracked as an exploration well by Superior Oil Company to a depth of 21,549 ft (6,568 m) and completed in 1979. The well produced 0.3 bcf gas in 19 months from the interval between 21,059 and 21,094 ft (6,419-6,429 m). Later, owing to production problems caused by tubing/casing failure, Superior abandoned production and transferred the well to DOE for testing under the geopressured-geothermal program. The well has recently been cleaned and recompleted by Eaton Operating Company, Houston, Texas, and plugged back to 20,725 ft (6,317 m). This well penetrates the deepest known Gulf Coast geopressured-geothermal reservoir and has a maximum recorded temperature of 338{degrees}F with a 560 ft (171 m) thick sandstone. Regional geologic work indicates that the Hulin sandstone represents either a submarine canyon or an unstable shelf delta type of environment. The well is presently perforated at the bottom of the sandstone from 20,610 to 20,690 ft (6282-6306 m) for preliminary short-term testing now in progress. Initial testing indicates the gas-brine ratio to be 31 SCF/STB.

John, C.J.; Stevenson, D.A.; Groat, C.G. (Louisiana Geological Survey, Baton Rouge (USA))

1990-09-01T23:59:59.000Z

402

DOE Hydrogen and Fuel Cells Program: DOE Hydrogen and Fuel Cells...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen and Fuel Cells Program Releases 2012 Annual Progress Report Jan 18, 2013 The U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program reports on activities and...

403

DOE Technical Standards Program: Online Approved DOE Technical Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Online Approved DOE Technical Standards Online Approved DOE Technical Standards No. 1001 – 2000 No. 3001 – 4000 No. 4001 – 5500 No. 5501 – 6000 No. 6001 – 6500 No. 7501 – 7750 Document Number Range 1001 – 2000 Number Title DOE-HDBK-1001-96 Guide to Good Practices for Training and Qualification of Instructors (80 pages) PDF (226 KB) DOE-HDBK-1002-96 Guide to Good Practices for Training and Qualification of Chemical Operators (70 pages) PDF (311 KB) DOE-HDBK-1003-96 Guide to Good Practices for Training and Qualification of Maintenance Personnel (106 pages) PDF (391 KB) DOE-HDBK-1010-92 (Reaffirmed 1999) DOE Fundamentals Handbook, Classical Physics (142 pages) PDF (1120 KB) DOE-HDBK-1011/1-92 (Reaffirmed 1999) DOE Fundamentals Handbook, Electrical Science, Volume 1 of 4 (166 pages) PDF (4255 KB)

404

DOE O 314.1, DOE-FLEX: DOE??s Telework Program  

Directives, Delegations, and Requirements

The order establishes the requirements and responsibilities for the Departments telework program. Cancels DOE N 314.1.

2013-02-11T23:59:59.000Z

405

Geothermal exploration program, Hill Air Force Base, Davis and Weber Counties, Utah  

DOE Green Energy (OSTI)

Results obtained from a program designed to locate a low- or moderate-temperature geothermal resource that might exist beneath Hill Air Force Base (AFB), Ogden, Utah are discussed. A phased exploration program was conducted at Hill AFB. Published geological, geochemical, and geophysical reports on the area were examined, regional exploration was conducted, and two thermal gradient holes were drilled. This program demonstrated that thermal waters are not present in the shallow subsurface at this site. (MHR)

Glenn, W.E.; Chapman, D.S.; Foley, D.; Capuano, R.M.; Cole, D.; Sibbett, B.; Ward, S.H.

1980-03-01T23:59:59.000Z

406

Session: Geopressured-Geothermal  

DOE Green Energy (OSTI)

This session at the Geothermal Energy Program Review X: Geothermal Energy and the Utility Market consisted of five presentations: ''Overview of Geopressured-Geothermal'' by Allan J. Jelacic; ''Geothermal Well Operations and Automation in a Competitive Market'' by Ben A. Eaton; ''Reservoir Modeling and Prediction at Pleasant Bayou Geopressured-Geothermal Reservoir'' by G. Michael Shook; ''Survey of California Geopressured-Geothermal'' by Kelly Birkinshaw; and ''Technology Transfer, Reaching the Market for Geopressured-Geothermal Resources'' by Jane Negus-de Wys.

Jelacic, Allan J.; Eaton, Ben A.; Shook, G. Michael; Birkinshaw, Kelly; Negus-de Wys, Jane

1992-01-01T23:59:59.000Z

407

Kentucky DOE EPSCoR Program  

Science Conference Proceedings (OSTI)

The KY DOE EPSCoR Program supports two research clusters. The Materials Cluster uses unique equipment and computational methods that involve research expertise at the University of Kentucky and University of Louisville. This team determines the physical, chemical and mechanical properties of nanostructured materials and examines the dominant mechanisms involved in the formation of new self-assembled nanostructures. State-of-the-art parallel computational methods and algorithms are used to overcome current limitations of processing that otherwise are restricted to small system sizes and short times. The team also focuses on developing and applying advanced microtechnology fabrication techniques and the application of microelectrornechanical systems (MEMS) for creating new materials, novel microdevices, and integrated microsensors. The second research cluster concentrates on High Energy and Nuclear Physics. lt connects research and educational activities at the University of Kentucky, Eastern Kentucky University and national DOE research laboratories. Its vision is to establish world-class research status dedicated to experimental and theoretical investigations in strong interaction physics. The research provides a forum, facilities, and support for scientists to interact and collaborate in subatomic physics research. The program enables increased student involvement in fundamental physics research through the establishment of graduate fellowships and collaborative work.

Grulke, Eric; Stencel, John [no longer with UK

2011-09-13T23:59:59.000Z

408

Semiannual progress report for the Idaho Geothermal Program, April 1--September 30, 1978  

SciTech Connect

Research and development performed by the Idaho Geothermal Program between April 1 and September 30, 1978 are discussed. Well drilling and facility construction at the Raft River geothermal site are described. Efforts to understand the geothermal reservoir are explained, and attempts to predict the wells' potential are summarized. Investigations into the direct uses of geothermal water, such as for industrial drying, fish farming, and crop irrigation, are reported. The operation of the facility's first electrical generator is described. Construction of the first 5-megawatt power plant is recounted. The design effort for the second pilot power plant is also described. University of Utah work with direct-contact heat exchangers is outlined. Special environmental studies of injection tests, ferruginous hawks, and dental fluorisis are summarized. The regional planning effort for accelerated commercialization is described. Demonstration projects in Oregon, Utah, and South Dakota are noted. A bibliographical appendix lists each internal and external report the Idaho Geothermal Program has published since its beginning in 1973.

Blake, G.L. (ed.)

1978-11-01T23:59:59.000Z

409

Semiannual progress report for the Idaho Geothermal Program, April 1--September 30, 1978  

DOE Green Energy (OSTI)

Research and development performed by the Idaho Geothermal Program between April 1 and September 30, 1978 are discussed. Well drilling and facility construction at the Raft River geothermal site are described. Efforts to understand the geothermal reservoir are explained, and attempts to predict the wells' potential are summarized. Investigations into the direct uses of geothermal water, such as for industrial drying, fish farming, and crop irrigation, are reported. The operation of the facility's first electrical generator is described. Construction of the first 5-megawatt power plant is recounted. The design effort for the second pilot power plant is also described. University of Utah work with direct-contact heat exchangers is outlined. Special environmental studies of injection tests, ferruginous hawks, and dental fluorisis are summarized. The regional planning effort for accelerated commercialization is described. Demonstration projects in Oregon, Utah, and South Dakota are noted. A bibliographical appendix lists each internal and external report the Idaho Geothermal Program has published since its beginning in 1973.

Blake, G.L. (ed.)

1978-11-01T23:59:59.000Z

410

UCSD geothermal chemistry program; Annual progress report, FY 1989  

DOE Green Energy (OSTI)

The development of a geothermal resource requires a considerable financial commitment. As in other energy extraction ventures, the security of this investment can be jeopardized by the uncertain behavior of the resource under operating conditions. Many of the most significant problems limiting the development of geothermal power are related to the chemical properties of the high temperature and highly pressured formation fluids from which the energy is extracted. When the pressure and temperature conditions on these fluids are changed either during the production phase (pressure changes) or during the extraction phase (temperature changes) of the operation, the fluids which were originally in equilibrium under the new conditions by precipitation of solid materials (scales) or release of dissolved gases (some toxic) in the formation and well bores or in the plant equipment. Unfortunately, predicting the behavior of the production fluids is difficult, because it is a function of many variables. In order to address these problems the Department of Energy is developing a computer model describing the chemistry of geothermal fluids. The model under development at UCSD is based on recent progress in the physical chemistry of concentrated aqueous solutions, and is covered in this report.

Weare, J.H.

1989-10-01T23:59:59.000Z

411

1997 DOE technical standards program workshop: Proceedings  

Science Conference Proceedings (OSTI)

The Department of Energy held its annual Technical Standards Program Workshop on July 8--10, 1997, at the Loews L`Enfant Plaza Hotel in Washington, DC. The workshop focused on aspects of implementation of the National Technology Transfer and Advancement Act of 1995 [Public Law (PL) 104-113] and the related revision (still pending) to OMB Circular A119 (OMB A119), Federal Participation in the Development and Use of Voluntary Standards. It also addressed DOE`s efforts in transitioning to a standards-based operating culture, and, through this transition, to change from a developer of internal technical standards to a customer of external technical standards. The workshop was designed to provide a forum to better understand how the new law is affecting Department activities. Panel topics such as ``Public Law 104-113 and Its Influence on Federal Agency Standards Activities`` and ``Update on Global Standards Issues`` provided insight on both the internal and external effects of the new law. Keynote speaker Richard Meier of Meadowbrook International (and formerly the Deputy Assistant US Trade Representative) addressed the subject of international trade balance statistics. He pointed out that increases in US export figures do not necessarily indicate increases in employment. Rather, increased employment results from product growth. Mr Meier also discussed issues such as the US migration to the sue of the metric system, the impact of budget limitations on Government participation in voluntary standards organizations, international standards ISO 9000 and ISO 14000, and DOE`s role in the worldwide transition from weapons production to cleanup.

NONE

1997-10-01T23:59:59.000Z

412

U.S. Department of Energy, Geothermal Program Review VII, Critique of the Geothermal Exploration R&D Program  

DOE Green Energy (OSTI)

Exploration can be described as consisting of two components: finding something worth drilling and testing; and defining and constraining that system after it has been drilled and tested. To date, geothermal exploration in the United States has concentrated on the drilling and testing of rather obvious targets--places where steam and boiling water issue from the ground. Relatively little has been done in the exploration of concealed or blind systems, probably because there have been so many obvious targets. However, these largely have been drilled, tested and constrained by boundaries, and almost entirely are committed to development schemes. The need now is to develop an exploration methodology for the '90s and thereafter that will be effective in the search for blind geothermal systems. Such work is being done currently in Japan; my company was privileged to have served the New Energy Development Organization and the Electric Power Development Company, both Japanese government companies, in the design of a methodology to assess concealed heat sources in 4 different terrains: recent volcanic with abundant thermal manifestations; volcanic outflow; volcanic or non-volcanic with few surface manifestations; and non-volcanic with background-level heat flow. work was based on the application of existing exploration techniques. The Japanese agencies now are attempting to develop new techniques specifically for the task of applying the methodology. Two important observations can be made about this quest for a methodology to explore (and find) concealed geothermal systems: First, most geothermal systems are dominated by ground-water hydrology; and very little is done to systematically investigate or define the effects of hydrology. The Cascade ''rain curtain'' is an example of the importance of hydrologic effects in geothermal exploration. We at GeothermEx first encountered this effect in 1975-76, when we drilled a 2,000-foot-deep hole west of Klamath Lake for Weyerhauser Company. Very little has been done since then to utilize the knowledge of this ''rain curtain'' in exploration in the Cascades or elsewhere.

Koenig, James B.

1989-03-21T23:59:59.000Z

413

Hot Dry Rock Geothermal Energy Development Program Annual Report Fiscal Year 1988  

DOE Green Energy (OSTI)

The complete list of HDR objectives is provided in Reference 10, and is tabulated below in Tables 1 and 2 for the reader's convenience. The primary, level 1, objective for HDR is ''to improve the technology to the point where electricity could be produced commercially from a substantial number of known HDR resource sites in a cost range of 5 to 8 cents/kWh by 1997''. A critically important milestone in attaining this cost target is the level II objective: ''Evaluate the performance of the Fenton Hill Phase II reservoir''. To appreciate the significance of this objective, a brief background is helpful. During the past 14 years the US DOE has invested $123 million to develop the technology required to make Hot Dry Rock geothermal energy commercially useful. The Governments of Japan and the Federal Republic of Germany have contributed an additional $32 million to the US program. The initial objectives of the program were met by the successful development and long-term operation of a heat-extraction loop in hydraulically-fractured hot dry rock. This Phase I reservoir produced pressurized hot water at temperatures and flow rates suitable for many commercial uses such as space heating and food processing. It operated for more than a year with no major problems or detectable environmental effect. With this accomplished and the technical feasibility of HDR energy systems demonstrated, the program undertook the more difficult task of developing a larger, deeper, hotter reservoir, called ''Phase II'', capable of supporting pilot-plant-scale operation of a commercial electricity-generating power plant. As described earlier in ''History of Research'', such a system was created and operated successfully in a preliminary 30-day flow test. However, to justify capital investment in HDR geothermal technology, industry now requires assurance that the reservoir can be operated for a long time without major problems or a significant decrease in the rate and quality of energy production. Industrial advisors to the HDR Program have concluded that, while a longer testing period would certainly be desirable, a successful and well-documented flow test of this high-temperature, Phase II reservoir lasting at least one year should convince industry that HDR geothermal energy merits their investment in its commercial development. This test is called the Long Term Flow Test (LTFT), and its completion will be a major milestone in attaining the Level 1 objective. However, before the LTFT could be initiated, well EE-2 had to be repaired, as also briefly described in the ''History of Research''. During this repair operation, superb progress was made toward satisfying the next most critically important Level II objective: Improve the Performance of HDR Drilling and Completion Technology. During the repair of EE-2, Los Alamos sidetracked by drilling out of the damaged well at 2.96 km (9700 ft), and then completed drilling a new-wellbore (EE-2A) to a total depth of 3.78 km (12,360 ft). As a consequence of this drilling experience, Los Alamos believes that if the original wells were redrilled today their combined cost would be only $8 million rather than the $18.8 million actually spent (a 60% cost saving). Further details, particularly of the completion of the well, can be found in the major section, ACCOMPLISHMENTS, but it can be seen that the second, Level II objective is already nearing attainment.

Dash, Zora V.; Murphy, Hugh D.; Smith, Morton C.

1988-01-01T23:59:59.000Z

414

Progress report on the DOE/DGE/LBL reservoir engineering and subsidence programs  

DOE Green Energy (OSTI)

Fiscal year 1978 was the second year of LBL's responsibility for the Geothermal Reservoir Engineering Management Program (GREMP) on behalf of the Division of Geothermal Energy of the Department of Energy. The history of this program through FY 1977 is explained in LBL's Earth Sciences Division Annual Report for 1978. Administrative highlights of the program in FY 1978 are given.

Howard J.H.; Noble, J.E.; Schwarz, W.J.; Graf, A.N.

1978-01-01T23:59:59.000Z

415

DOE - Fossil Energy: DOE Natural Gas Regulatory Program  

NLE Websites -- All DOE Office Websites (Extended Search)

and Sample Report Formats & Guidelines - Browse Applications submitted to DOE - LNG Export, Previously Imported and Long Term Natural Gas Dockets - Application Status,...

416

DOE-EERC jointly sponsored research program  

Science Conference Proceedings (OSTI)

U.S. Department of Energy (DOE) Cooperative Agreement DE-FC21-93MC30098 funded through the Office of Fossil Energy and administered at the Federal Energy Technology Center (FETC) supported the performance of a Jointly Sponsored Research Program (JSRP) at the Energy and Environmental Research Center (EERC) with a minimum 50% nonfederal cost share to assist industry in commercializing and effectively applying efficient, nonpolluting energy technologies that can compete effectively in meeting market demands for clean fuels, chemical feedstocks, and electricity in the 21st century. The objective of the JSRP was to advance the deployment of advanced technologies for improving energy efficiency and environmental performance through jointly sponsored research on topics that would not be adequately addressed by the private sector alone. Examples of such topics include the barriers to hot-gas cleaning impeding the deployment of high-efficiency power systems and the search for practical means for sequestering CO{sub 2} generated by fossil fuel combustion. The selection of particular research projects was guided by a combination of DOE priorities and market needs, as provided by the requirement for joint venture funding approved both by DOE and the private sector sponsor. The research addressed many different energy resource and related environmental problems, with emphasis directed toward the EERC's historic lead mission in low-rank coals (LRCs), which represent approximately half of the U.S. coal resources in the conterminous states, much larger potential resources in Alaska, and a major part of the energy base in the former U.S.S.R., East Central Europe, and the Pacific Rim. The Base and JSRP agreements were tailored to the growing awareness of critical environmental issues, including water supply and quality, air toxics (e.g., mercury), fine respirable particulate matter (PM{sub 2.5}), and the goal of zero net CO{sub 2} emissions.

Hendrikson, J.G.; Sondreal, E.A.

1999-09-01T23:59:59.000Z

417

Gulf Coast geopressured-geothermal program summary report compilation. Volume 1: Executive summary  

DOE Green Energy (OSTI)

The significant accomplishments of this program included (1) identification of the geopressured-geothermal onshore fairways in Louisiana and Texas, (2) determination that high brine flow rates of 20,000--40,000 barrels a day can be obtained for long periods of time, (3) brine, after gas extraction can be successfully reinjected into shallow aquifers without affecting the surface waters or the fresh water aquifers, (4) no observable subsidence or microseismic activity was induced due to the subsurface injection of brine, and no detrimental environmental effects attributable to geopressured-geothermal well testing were noticed, (5) sanding can be controlled by reducing flow rates, (6) corrosion controlled with inhibitors, (7) scaling controlled by phosphonate scale inhibitors, (8) demonstrated that production of gas from saturated brine under pressure was viable and (9) a hybrid power system can be successfully used for conversion of the thermal and chemical energy contained in the geopressured-geothermal resource for generation of electricity.

John, C.J.; Maciasz, G.; Harder, B.J.

1998-06-01T23:59:59.000Z

418

Semiannual progress report for the Idaho Geothermal Program, October 1, 1978-March 31, 1979  

DOE Green Energy (OSTI)

Well drilling at the Geothermal Site is discussed. Experiments of the direct use of geothermal waters are described. An account of the facility's first 5-megawatt power plant is presented. The second 5-megawatt pilot plant's use of direct-contact heat exchangers is examined. University of Utah work on direct-contact heat exchangers is also discussed. The environmental studies of injection tests, an aquatic characterization survey of the Raft River and the ferruginous hawk are summarized. The regional planning effort for accelerated commercialization is described. Demonstration projects in Oregon, Utah, and South Dakota are noted. A biblographic index lists each internal and external report the Idaho Geothermal Program has published this report period.

Burdge, L.F.; Schultz, R.J.; Stiger, R.R.

1979-10-01T23:59:59.000Z

419

Semiannual progress report for the Idaho Geothermal Program, October 1, 1978-March 31, 1979  

SciTech Connect

Well drilling at the Geothermal Site is discussed. Experiments of the direct use of geothermal waters are described. An account of the facility's first 5-megawatt power plant is presented. The second 5-megawatt pilot plant's use of direct-contact heat exchangers is examined. University of Utah work on direct-contact heat exchangers is also discussed. The environmental studies of injection tests, an aquatic characterization survey of the Raft River and the ferruginous hawk are summarized. The regional planning effort for accelerated commercialization is described. Demonstration projects in Oregon, Utah, and South Dakota are noted. A biblographic index lists each internal and external report the Idaho Geothermal Program has published this report period.

Burdge, L.F.; Schultz, R.J.; Stiger, R.R.

1979-10-01T23:59:59.000Z

420

Vehicle Technologies Office: 2011 DOE Hydrogen Program and Vehicle  

NLE Websites -- All DOE Office Websites (Extended Search)

1 DOE Hydrogen 1 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting to someone by E-mail Share Vehicle Technologies Office: 2011 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Facebook Tweet about Vehicle Technologies Office: 2011 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Twitter Bookmark Vehicle Technologies Office: 2011 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Google Bookmark Vehicle Technologies Office: 2011 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Delicious Rank Vehicle Technologies Office: 2011 DOE Hydrogen Program and

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE Proposes Regulations for Loan Guarantee Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Proposes Regulations for Loan Guarantee Program DOE Proposes Regulations for Loan Guarantee Program DOE Proposes Regulations for Loan Guarantee Program May 10, 2007 - 12:45pm Addthis Program to spur clean, innovative energy technologies WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a Notice of Proposed Rulemaking (NOPR) for its Loan Guarantee program, which will help spur investment in projects that employ new, clean energy technologies. Projects within DOE's Loan Guarantee program will help sustain economic growth, yield environmental benefits and allow for a more stable and secure energy supply. Under the FY'07 Continuing Resolution, Congress provided DOE with authority to issue guarantees for up to $4 billion in loans; and in the Administration's FY'08 budget, DOE requested $9 billion in loan guarantee authority.

422

Vehicle Technologies Office: 2009 DOE Hydrogen Program and Vehicle  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting to someone by E-mail Share Vehicle Technologies Office: 2009 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Facebook Tweet about Vehicle Technologies Office: 2009 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Twitter Bookmark Vehicle Technologies Office: 2009 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Google Bookmark Vehicle Technologies Office: 2009 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Delicious Rank Vehicle Technologies Office: 2009 DOE Hydrogen Program and

423

Vehicle Technologies Office: 2010 DOE Hydrogen Program and Vehicle  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting to someone by E-mail Share Vehicle Technologies Office: 2010 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Facebook Tweet about Vehicle Technologies Office: 2010 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Twitter Bookmark Vehicle Technologies Office: 2010 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Google Bookmark Vehicle Technologies Office: 2010 DOE Hydrogen Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting on Delicious Rank Vehicle Technologies Office: 2010 DOE Hydrogen Program and

424

DOE Hydrogen and Fuel Cells Program: Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Efficiency and Renewable Energy Fossil Energy Nuclear Energy Science U.S. Department of Energy Search help Home > DOE Participants > Science Printable Version Science DOE's...

425

LLL Geothermal Energy Program. Status report, January 1976--January 1977  

DOE Green Energy (OSTI)

Titles of the five sections are: program description; program plans and results; energy-conversion engineering; brine chemistry and materials; and earth sciences program. The last three sections were abstracted and indexed individually for ERA/EDB. (JGB)

Austin, A.L.; Lundberg, A.W.; Owen, L.B.; Tardiff, G.E. (comps.) [comps.

1977-04-27T23:59:59.000Z

426

Gulf Coast geopressured-geothermal program summary report compilation. Volume 3: Applied and direct uses, resource feasibility, economics  

DOE Green Energy (OSTI)

The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Geopressured-geothermal hybrid cycle power plant: design, testing, and operation summary; Feasibility of hydraulic energy recovery from geopressured-geothermal resources: economic analysis of the Pelton turbine; Brine production as an exploration tool for water drive gas reservoirs; Study of supercritical Rankine cycles; Application of the geopressured-geothermal resource to pyrolytic conversion or decomposition/detoxification processes; Conclusions on wet air oxidation, pyrolytic conversion, decomposition/detoxification process; Co-location of medium to heavy oil reservoirs with geopressured-geothermal resources and the feasibility of oil recovery using geopressured-geothermal fluids; Economic analysis; Application of geopressured-geothermal resources to direct uses; Industrial consortium for the utilization of the geopressured-geothermal resource; Power generation; Industrial desalination, gas use and sales, pollutant removal, thermal EOR, sulfur frasching, oil and natural gas pipelining, coal desulfurization and preparation, lumber and concrete products kilning; Agriculture and aquaculture applications; Paper and cane sugar industries; Chemical processing; Environmental considerations for geopressured-geothermal development. 27 figs., 25 tabs.

John, C.J.; Maciasz, G.; Harder, B.J.

1998-06-01T23:59:59.000Z

427

Economic assessment of geothermal direct heat technology: A review of five DOE demonstration projects  

DOE Green Energy (OSTI)

In this report the cost of using low temperature geothermal energy resources for direct heating applications is compared to the costs associated with conventional heating fuels. The projects compared all involved replacing conventional fuels (e.g., natural gas and fuel oils) with geothermal energy in existing heating systems. The cost of using geothermal energy in existing systems was also compared with the cost of new coal-fired equipment.

Hederman, William F. Jr.; Cohen, Laura A.

1981-06-01T23:59:59.000Z

428

DOE Technical Standards Program Procedures, 2009, DOE-TSPP-8  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Revision: 5 Date: July 1, 2009 APPROVING AND ISSUING DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Assistance Washington, D.C. 20585...

429

Session: Program Review X Wrap-Up  

DOE Green Energy (OSTI)

This wrap-up session at the Geothermal Energy Program Review X: Geothermal Energy and the Utility Market consisted of Closing Remarks by Roland R. Kessler and six NGA Industry Critique Panel presentations: ''Summary of Comments on DOE-Industry Cooperation by Geothermal Industry Panel'' by James B. Koenig, GeothermEx, Inc.; ''NGA Industry Critique of the Exploration Component'' by Joe L. Iovenitti, Weiss Associates; ''Critique of Drilling Research'' by Jerry Hamblin, UNOCAL Geothermal; ''Critique Panel Comments on Reservoir Engineering, DOE Geothermal Technology Development'' by Dennis Kaspereit, California Energy Company, Inc.; ''DOE Geothermal Program Review - Critique on Production'' by Douglas B. Jung, Two-Phase Engineering and Research; ''Comments on the DOE Hydrothermal Energy Conversion R&D Program'' by David L. Mendive, Geothermal Development Associates.

None

1992-01-01T23:59:59.000Z

430

Overview: DOE Order 450.1A, Environmental Protection Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview: DOE Order 450.1A, Environmental Protection Program Jane Powers DOE Environmental Session June 5, 2008 What's Covered? Why Re-Write O 450.1? New EMS Requirements How Far...

431

DOE Order Self Study Modules - DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3.1B 3.1B MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES DOE O 433.1B Familiar Level August 2011 1 DOE O 433.1B MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES FAMILIAR LEVEL OBJECTIVES Given the familiar level of this module and the resources, you will be able to answer the following questions: 1. What is the objective of DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities? 2. What is the purpose for quantitative indicators in maintenance management? 3. What are three types of environmental controls included in a maintenance shop? 4. What is the relationship between DOE G 433.1-1 and DOE O 433.1A? 5. What is the purpose for post-maintenance testing? 6. What is the objective of a good equipment maintenance history program?

432

EPRI geothermal energy R and D 5-year program plan (1975 to 1979)  

DOE Green Energy (OSTI)

The recommended EPRI Geothermal Research and Development 5-Year Program Plan has been defined to complement and provide focus for federally sponsored geothermal energy R and D efforts. The scope of the program includes: verification of hydrothermal reservoir capability and low salinity brine heat transfer characteristics at a potential demonstration site followed by design, development and construction of a low salinity hydrothermal demonstration plant in conjunction with an electric utility or utility consortium. Development of a comprehensive set of Guidelines Manuals for use by utility management and engineers spanning the full range of geothermal resource utilization from exploration through plant startup, including not only technical, but environmental, institutional and regulatory factors. A subprogram to define the potential and requirements for Geothermal Systems. A supporting research and technology subprogram oriented toward minimizing the risk associated with utilization of low and high salinity hydrothermal sources. An Advanced Research and Technology subprogram to assess the potential of geopressure resources in conjunction with the Federal government and limited R and D on advanced concepts for utilization of hydrothermal fluids. (MHR)

Spencer, D.F.

1974-10-17T23:59:59.000Z

433

Session 18: Geothermal Well Stimulation - Program Summary and the Beowawe Field Experiment  

DOE Green Energy (OSTI)

Republic Geothermal, Inc. and its subcontractors have planned and executed laboratory studies and eight well stimulation field experiments under the Geothermal Reservoir Well Stimulation Program (GRWSP). The program, begun in February 1979, has concentrated on extending petroleum industry stimulation technology for use by the geothermal industry. The most recent experiment was in a naturally fractured Chevron well at Beowawe and involved an acid stimulation of a damaged interval which yielded a 2.3-fold increase in injectivity. Overall results to date have shown that stimulation is viable where adequate reservoirs are penetrated by wells encountering formation damage or locally tight formations. However, wells in marginal naturally fractured reservoirs have not been saved by the types of well stimulation jobs performed thus far. A recent discovery is that many wells can possibly be made outstanding producers by widening and propping compliant natural fractures. Confirmation of this constitutes unfinished business of the GRWSP, and offers one of the greatest potential opportunities for enhancing the economics of geothermal power production.

Verity, R.V.

1983-12-01T23:59:59.000Z

434

DOE Headquarters Contact Information: Employee Concerns Program Patricia Zarate Phone:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Contact Information: Headquarters Contact Information: Employee Concerns Program Patricia Zarate Phone: 202-586-2248 Fax: 202-586-3075 E-mail: patricia.zarate@hq.doe.gov Mailing Address: U.S. Department of Energy Employee Concerns Program 1000 Independence AVE, SW Room 5B-168, ED-4 Washington, DC 20585 Contractor Whistleblower Protection Program (Part 708) Janet Freimuth 202-287-1439 janet.freimuth@hq.doe.gov Office of Conflict Prevention and Resolution Kathy Binder 202-586-6972 kathleen.binder@hq.doe.gov Pam Pontillo 202-586-4002 pamela.pontillo@hq.doe.gov Office of the Ombudsman Rita Franklin 202-586-0500 ombudsman@hq.doe.gov rita.franklin@hq.doe.gov Cathy Barchi 202-586-0500 ombudsman@hq.doe.gov cathy.barchi@hq.doe.gov William Maurer 202-586-0500 ombudsman@hq.doe.gov

435

DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM SSAB » DOE Manual - EM SSAB » DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum requirements for Federal agencies to manage and administer advisory committees. The Manual provides detailed Department of Energy (DOE or Department) requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. DOE Manual - Advisory Committee Management Program

436

DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM SSAB » DOE Manual - EM SSAB » DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM This Manual supplements the Federal Advisory Committee Act (FACA), Title 5 United States Code (U.S.C.), Appendix 2, as amended, and the General Services Administration's (GSA's) final rule "Federal Advisory Committee Management" Title 41 Code of Federal Regulations (CFR), Part 102-3, which establishes the policies and minimum requirements for Federal agencies to manage and administer advisory committees. The Manual provides detailed Department of Energy (DOE or Department) requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. DOE Manual - Advisory Committee Management Program

437

DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA)  

NLE Websites -- All DOE Office Websites (Extended Search)

0. 1 B: Worker Protection Program for DOE (Including 0. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees DOE Order 440. 1 B: Worker Protection Program for DOE (Including NNSA) Federal Employees Stakeholders: DOE and NNSA employees Scope: DOE Order 440.1 B establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing Department of Energy, including National Nuclear Security Administration (NNSA), Federal workers with a safe and healthful workplace. Summary: Among the requirements of DOE Order 440.1 B, the Department must provide its employees, including NNSA, a number of protections relating to whistle blowing guidelines. The relevant section of requirements includes: 4. REQUIREMENTS. DOE elements must:

438

Geothermal energy development in Colorado. Appendix 7 of regional operations research program for development of geothermal energy in the Southwest United States. Final technical report, June 1977--August 1978  

DOE Green Energy (OSTI)

The term ''geothermal energy'' is a term that means different things to different people. To an increasing number, it means a practical, environmentally compatible energy resource that can, right now, help to relieve an overdependency upon fossil fuels. The potential for use of geothermal energy in Colorado seems to be substantial. As described by Barrett and Pearl (1978), at least 56 separate areas have surface manifestations of hydrothermal (hot water) resources. These areas are estimated to contain 5.914 quads (5.914 x 10{sup 15} Btu) of energy, with extractable energy of 1.48 quads. Geothermal resources already contribute to Colorado's energy supply. In fact, since the early 1900's, practical uses of geothermal resources have been common in Pagosa Springs, in Southwest Colorado. Residents there have used hot-water wells to heat numerous buildings, including the County Court House, schools, churches, the newspaper office, a liquor store, 2 hotels, 2 service stations, a drugstore, and a bank, as well as for the swimming pool and spa. Where resources are in use in other parts of the State, most are used for swimming pools or baths. A few wells or springs serve other purposes, among them space heating and agriculture, including greenhouses, a fish farm and algae-growing. Seemingly, interest in and awareness of the resources is growing. If leases and permits are made available, along with some economic incentives, some or all of the three potential power-generation sites may be developed by private industry. Perhaps with the assistance of federal programs, initially, lower temperature resources, too, will be developed by private industry. While government can provide opportunities, the outcome depends upon the decisions of numerous individuals throughout the system. Colorado does have geothermal resources that can contribute to the energy supply. It remains to be seen whether these resources will fulfill their promise.

Pearl, Richard A.; Coe, Barbara

1979-01-01T23:59:59.000Z

439

JM to Develop DOE O 470.X, Insider Threat Program  

Directives, Delegations, and Requirements

The Order establishes top-level responsibilities and requirements for DOE's Insider Threat Program, which is intended to deter, detect, and mitigate insider ...

2013-10-17T23:59:59.000Z

440

2012 Annual Progress Report: DOE Hydrogen and Fuel Cells Program  

Fuel Cell Technologies Publication and Product Library (EERE)

The 2012 Annual Progress Report summarizes fiscal year 2012 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program.

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOE Fuel Cell Technologies Program Record, Record # 11003, Fuel...  

NLE Websites -- All DOE Office Websites (Extended Search)

failure modes. (4) DOE targets are for real-world applications; refer to Hydrogen, Fuel Cells, & Infrastructure Technologies Program Plan. 3 On Road Durability Through the...

442

DOE Hydrogen and Fuel Cells Program: 2011 Annual Progress Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Reinvestment Act (ARRA) This section of the 2011 Progress Report for the DOE Hydrogen and Fuel Cells Program focuses on the fuel cell technologies America Recovery and Reinvestment...

443

DOE Hydrogen and Fuel Cells Program: 2012 Annual Progress Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 Annual Progress Report XI. Systems Analysis This section of the 2012 Annual Progress Report for the DOE Hydrogen and Fuel Cells Program focuses on systems analysis. Systems...

444

DOE Hydrogen and Fuel Cells Program: 2008 Annual Progress Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Annual Progress Report IV. Hydrogen Storage This section of the 2008 Progress Report for the DOE Hydrogen Program focuses on hydrogen storage. Each technical report is available...

445

JGI - Sequencing for the DOE Genomics: GTL Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Educational Resources MyJGI: Information for Collaborators Sequencing for the DOE Genomics: GTL Program For status information, see the Genome Projects section. For more...

446

Federal Energy Management Program: DOE Enhances Management of...  

NLE Websites -- All DOE Office Websites (Extended Search)

resource Send a link to Federal Energy Management Program: DOE Enhances Management of Energy Savings Performance Contracts to someone by E-mail Share Federal Energy Management...

447

DOE O 251.1C, Departmental Directives Program  

Directives, Delegations, and Requirements

To define requirements and responsibilities for implementing the Department of Energy (DOE) Directives Program in support of the Secretary's memorandum of ...

2009-01-15T23:59:59.000Z

448

Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES Order Module--DOE O 440.1B, WORKER PROTECTION PROGRAM FOR DOE (INCLUDING NNSA) FEDERAL EMPLOYEES The familiar level of this module is divided into two sections. In the first section, we will discuss the objective, requirements, and the responsibilities assigned to the heads of field elements. In the second section, we will discuss the content of attachment 1, Functional Area Requirements. We have provided examples and a practice to help familiarize you with the material. The practice will also help prepare you for the criterion test. DOE Order Self Study Modules - DOE O 440.1B, Worker Protection Management for DOE (Including the National Nuclear Security Administration) Federal

449

Geothermal well site restoration and plug and abandonment of wells, DOE Gladys McCall test site, Cameron Parish, Louisiana and DOE Willis Hulin test site, Vermillion Parish, Louisiana  

DOE Green Energy (OSTI)

A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana--the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

Rinehart, Ben N.

1994-08-01T23:59:59.000Z

450

Geothermal Energy  

DOE Green Energy (OSTI)

Geothermal Energy (GET) announces on a bimonthly basis the current worldwide information available on the technologies required for economic recovery of geothermal energy and its use as direct heat or for electric power production. This publication contains the abstracts of DOE reports, journal articles, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database during the past two months.

Steele, B.C.; Pichiarella, L.S. [eds.; Kane, L.S.; Henline, D.M.

1995-01-01T23:59:59.000Z

451

Geothermal Technologies Office: Hydrothermal and Resource Confirmation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

452

EERE: Geothermal Technologies Office Home Page  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search Help Geothermal Technologies Office HOME ABOUT...

453

Enhanced Geothermal Systems (EGS) | Open Energy Information  

Open Energy Info (EERE)

Enhanced Geothermal Systems (EGS) Enhanced Geothermal Systems (EGS) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Enhanced Geothermal Systems (EGS) Geothermal Technologies There are many types of Geothermal Technologies that take advantage of the earth's heat: Hydrothermal Systems Enhanced Geothermal Systems (EGS) Sedimentary Geothermal Systems Co-Produced Geothermal Systems Geothermal Direct Use Ground Source Heat Pumps EGS Links Related documents and websites DOE EGS Technical Roadmap DOE EGS Systems Demonstration Projects How EGS Works (Animation) EGS Development (Animation) EGS Schematic.jpg ] Dictionary.png Enhanced Geothermal Systems: Enhanced Geothermal Systems (EGS) are human engineered hydrothermal reservoirs developed for commercial use as an alternative to naturally

454

Geothermal Energy; (USA)  

DOE Green Energy (OSTI)

Geothermal Energy (GET) announces on a bimonthly basis the current worldwide information available on the technologies required for economic recovery of geothermal energy and its use as direct heat or for electric power production. This publication contains the abstracts of DOE reports, journal article, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database (EDB) during the past two months. Also included are US information obtained through acquisition programs or interagency agreements and international information obtained through the International Energy Agency's Energy Technology Data Exchange or government-to-government agreements.

Raridon, M.H.; Hicks, S.C. (eds.)

1991-01-01T23:59:59.000Z

455

DOE Office of Science Programs and NERSC Allocation Managers  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE DOE Allocation Managers Department of Energy Science Offices, Programs and Allocation Managers NERSC is overseen by the DOE NERSC Program Manager, Dave Goodwin (Dave.Goodwin@science.doe.gov; 301-903-6474). He is assisted by the DOE Allocation Managers in each of the six offices. They are listed in the table below. The DOE Allocation Managers are responsible for managing the NERSC allocations. To find your Allocation Manager, check under the Office and Program which sponsors your work, locate your DOE Program Manager, and find the corresponding Allocation Manager. You should contact your Allocation Manager with questions concerning your allocation at NERSC. NERSC manages Startup, Education, NISE and Data Pilot allocations. Advanced Scientific Computing Research (ASCR)

456

NETL: News Release - DOE's Produced Water Program Yields New...  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 DOE's Produced Water Program Yields New Web Tool Cost-Effectively Treating Produced Water Boosts U.S. Energy, Water Supplies Washington, DC - A comprehensive new program...

457

Hydrogen Storage Sub-Program Overview - DOE Hydrogen and Fuel...  

NLE Websites -- All DOE Office Websites (Extended Search)

FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program IntroductIon The Hydrogen Storage sub-program supports research and development (R&D) of materials and...

458

DOE Hydrogen and Fuel Cells Program Plan (September 2011)  

Fuel Cell Technologies Publication and Product Library (EERE)

The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities

459

DOE Hydrogen and Fuel Cells Program: Hydrogen and Fuel Cells...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen and Fuel Cells Program Presents Annual Merit Review Awards May 21, 2013 The U.S. Department of Energy's (DOE's) Hydrogen and Fuel Cells Program presented its annual awards...

460

DOE Headquarters Contact Information: Employee Concerns Program Patricia Zarate Phone:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employee Concerns Program http://energy.gov/diversity 1 Employee Concerns Program http://energy.gov/diversity 1 DOE Headquarters Contact Information: Employee Concerns Program Patricia Zarate Phone: 202-586-2248 Fax: 202-586-3075 E-mail: patricia.zarate@hq.doe.gov Mailing Address: U.S. Department of Energy Employee Concerns Program 1000 Independence AVE, SW Room 5B-168, ED-4 Washington, DC 20585 Contractor Whistleblower Protection Program (Part 708) Janet Freimuth 202-287-1439 janet.freimuth@hq.doe.gov Office of Conflict Prevention and Resolution Kathy Binder 202-586-6972 kathleen.binder@hq.doe.gov Pam Pontillo 202-586-4002 pamela.pontillo@hq.doe.gov DOE Field Office ECP Contact Information: Albuquerque Complex (NNSA) Eva Glow Brownlow Michelle Rodriguez de Varela Hotline: 800-688-5713

Note: This page contains sample records for the topic "doe geothermal program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obta