National Library of Energy BETA

Sample records for doe action notice

  1. Notice of OMB Action Approving DOE Submission to Extend Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) ...

  2. Notices ACTION: Notice.

    Office of Environmental Management (EM)

    8867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  3. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  4. Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants

    Broader source: Energy.gov [DOE]

    The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for three years the Information Collection Request Title: OE...

  5. Notices ACTION: Notice of Open Teleconference Meeting.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    405 Federal Register / Vol. 78, No. 160 / Monday, August 19, 2013 / Notices ACTION: Notice of Open Teleconference Meeting. SUMMARY: This notice announces a meeting of the Advanced Scientific Computing Advisory Committee (ASCAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. DATES: Tuesday, September 3, 2013, 12:00 p.m. to 3:00 p.m. ADDRESSES: The meeting is open to the public. To access the

  6. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Notice of Proposed Civil Penalty and Requests for Test Data Issued) | Department of Energy Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited

  7. Cancelled- DOE Secretarial Notice: National Environmental Policy Act (DOE, 1990)

    Broader source: Energy.gov [DOE]

    This Secretarial Notice announced revisions of DOE compliance procedures under the National Environmental Policy Act. This notice has been cancelled and is for historical use only.

  8. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070,...

  9. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determinations to Midea America Corporation and Felix Storch, Inc. for a compact freezer that, as determined by...

  10. EAC Recommendations for DOE Action Regarding Interconnection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding ...

  11. Federal Register Notices for DOE NEPA Guidelines and Regulations...

    Office of Environmental Management (EM)

    Notices for DOE NEPA Guidelines and Regulations Federal Register Notices for DOE NEPA Guidelines and Regulations Historical compilation of Federal Register notices for DOE NEPA...

  12. DOE FACT SHEET: CLIMATE ACTION CHAMPION TECHNICAL ASSISTANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACT SHEET: CLIMATE ACTION CHAMPION TECHNICAL ASSISTANCE Blue Lake Rancheria Energy Performance Assessment Overview The Blue Lake Rancheria Tribe (BLR) was recognized as a Climate Action Champion (CAC) by The White House and the Department of Energy (DOE) in December 2014. In 2015, DOE released a Notice of Technical Assistance (NOTA) to provide CACs with additional opportunities for financial and technical assistance to support and advance their greenhouse gas emissions reduction and climate

  13. DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Failure to Certify 116 Products | Department of Energy Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products January 28, 2010 - 1:49pm Addthis WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to

  14. EIS-0453: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0453: DOE Notice of ... the Draft Environmental Impact Statement (EIS) for the Recapitalization of Infrastructure ...

  15. EIS-0375: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C ...

  16. Notice of Preferred Sodium Bearing Waste Treatment Technology (DOE/EIS-0287) (08/03/05)

    Office of Environmental Management (EM)

    Collection Request Title: OE Recovery Act Financial Assistance Grants | Department of Energy OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for

  17. Notice of Emergency Action - Emergency Order To Resume Limited...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Action - Emergency Order To Resume Limited Operation at the Potomac River ... Notice of Emergency Action - Emergency Order To Resume Limited Operation at the Potomac ...

  18. DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity...

    Energy Savers [EERE]

    DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing ...

  19. EA-1858: DOE Notice of Availability and Notice of Floodplain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Washington The U.S. Department of Energy (DOE) is proposing to provide American...

  20. SEA-04: DOE Notice of Availability of the Special Environmental Analysis |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SEA-04: DOE Notice of Availability of the Special Environmental Analysis SEA-04: DOE Notice of Availability of the Special Environmental Analysis Potomac Generating Station DOE has prepared a Special Environmental Analysis (SEA) for Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia, and is announcing its availability. In the SEA, DOE examines environmental impacts from the

  1. DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process September ...

  2. Cancelled- DOE Secretarial Notice: National Environmental Policy Act (1990)

    Broader source: Energy.gov [DOE]

    This Secretarial Notice announced revisions of DOE compliance procedures under the National Environmental Policy Act. This notice has been cancelled and is for historical use only.

  3. DOE Secretarial Notice: National Environmental Policy Act (February...

    Office of Environmental Management (EM)

    Notice: National Environmental Policy Act (February 5, 1990, status: cancelled) DOE Secretarial Notice: National Environmental Policy Act (February 5, 1990, status: cancelled) This...

  4. EAC Recommendations for DOE Action Regarding the Power Marketing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations for DOE Action Regarding the Power Marketing Administrations - June 18, 2012 EAC Recommendations for DOE Action Regarding the Power Marketing Administrations - June ...

  5. EAC Recommendations for DOE Action Regarding Consumer Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action ...

  6. EAC Recommendations for DOE Action Regarding the Electricity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding the Electricity Workforce - October 17, 2012 EAC Recommendations for DOE Action Regarding ...

  7. Notice regarding DOE NEPA implementation

    Broader source: Energy.gov [DOE]

    Announces the Secretary's 10-point initiative to ensure that all DOE activities are carried out in full compliance with the letter and spirit of environmental statutes and regulations.

  8. EIS-0472: DOE Notice of Availability of a Draft Programmatic...

    Energy Savers [EERE]

    DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the...

  9. EA-1790: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc, MS The U.S. Department of Energy (DOE) has prepared a draft Environmental...

  10. EIS-0440: DOE Notice of Availablity of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement DOE announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This ...

  11. NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOTICE: U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office ACTION: Finding of No Significant Impact (FONSI); Paducah Gaseous Diffusion Plant Environmental Assessment (EA) for Potential Land and Facilities Transfers, McCracken County, Kentucky DATE: l)SUMMARY: The Proposed Action is to transfer DOE real property at the Paducah Gaseous Diffusion Plant (PGDP) site to one or more entities for a use that is different from its current use. DOE's Paducah Gaseous Diffusion Plant

  12. EIS-0396: DOE Notice of Availability of the Draft Programmatic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement | Department of Energy DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0396: DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The Department of Energy (DOE) announces the availability of the Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (Draft GNEP PEIS, DOE/EIS-0396). Notice of Availability of Draft Global Nuclear

  13. DOE Action Plan Addressing the Electricity Transmission System

    Broader source: Energy.gov (indexed) [DOE]

    U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM DRAFT DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * ...

  14. DOE SEE Action, "Behavior Change Strategies in Traditional Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEE Action, "Behavior Change Strategies in Traditional Energy Efficiency Programs" Webinar DOE SEE Action, "Behavior Change Strategies in Traditional Energy Efficiency Programs"...

  15. Cancellation Notice for Policies, Notices, Orders or Manuals - DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directives, Delegations, and Requirements Notice for Policies, Notices, Orders or Manuals by Website Administrator Microsoft Word Document icon CancellationNotice-PoliciesNoticesOrdersManuals (2).doc - Microsoft Word Document, 30 KB (3123

  16. EA-1792-S1: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's ...

  17. EAC Recommendations for DOE Action Regarding Non-Wires Solutions...

    Office of Environmental Management (EM)

    Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires...

  18. 2014 Directory of Potential Stakeholders for DOE Actions under...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Directory of Potential Stakeholders for DOE Actions under NEPA Issued 2014 Directory of Potential Stakeholders for DOE Actions under NEPA Issued July 7, 2014 - 5:02pm Addthis ...

  19. EIS-0423: DOE Notice of Availability of the Final Environmental...

    Office of Environmental Management (EM)

    of the Final Environmental Impact Statement More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  20. EIS-0407: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas PDF icon E9-22920.pdf More Documents &...

  1. EIS-0464: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0464: DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, ...

  2. EIS-0377: DOE Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project The Western Area Power Administration...

  3. EIS-0481: DOE Notice of Availability of Draft Programmatic Environment...

    Energy Savers [EERE]

    31715. For more information on this project, see the project page: http:energy.govnode361381. Download Document PDF icon EIS-0481: DOE Notice of Availability of Draft...

  4. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project ...

  5. EIS-0447: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of...

  6. EA-1792: DOE Notice of Availability of the Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Turbine Testing and Demonstration Project, Gulf of Maine PDF icon EA-1792-DOENOAFEA-20110.pdf More Documents & Publications EA-1792: DOE Notice of Availability of the...

  7. EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid - June 6, 2013 | Department of Energy Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on Consumer Acceptance of Smart Grid - June 6, 2013 (338.72 KB) More Documents & Publications DOE Responses to EAC Work Products - September 2013

  8. EIS-0486: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of Draft Environmental Impact Statement EIS-0486: DOE Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a draft EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600

  9. EIS-0499: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 9: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0499: DOE Notice of Availability of Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota The U.S. Department of Energy (DOE) announced the availability of the Draft Environmental Impact Statement for the Great Northern Transmission Line Project. DOE also is announcing the dates, times, and locations for public hearings to receive comments on the Draft

  10. EIS-0503: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 3: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0503: DOE Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE announced the availability of the Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric

  11. DOE - NNSA/NFO -- FFACO Public Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FFACO Public Notices NNSANFO Language Options U.S. DOENNSA - Nevada Field Office FFACO Public Notices The Nevada Field Office will be submitting the following documents proposing ...

  12. EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - June 6, 2013 | Department of Energy Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on Interconnection-Wide Planning - June 6, 2013 (147.93 KB) More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 -

  13. EAC Recommendations for DOE Action Regarding a Strategic Portable

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generation Reserve - October 17, 2012 | Department of Energy a Strategic Portable Generation Reserve - October 17, 2012 EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve - October 17, 2012 EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve, approved at the October 15-16, 2012 EAC Meeting. EAC Recommendations for DOE Action on a Strategic Portable Generation Reserve - October 17, 2012 (119.75 KB) More Documents &

  14. EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement DOE announces the availablity of the Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement for public review and comment. Comment period ends: 3/17/15.

  15. DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report | Department of Energy Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report (447.33 KB) More Documents & Publications LM Annual NEPA Planning Summary 2014 EA-1535: Final Programmatic Environmental Assessment EA-1934: 2015 Annual Report for Mitigation Action

  16. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Broader source: Energy.gov (indexed) [DOE]

    Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting. EAC Recommendations for DOE Action Regarding Implementing Effective...

  17. EAC Recommendations for DOE Action Regarding Development of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon EAC Recommendations for DOE Action on the Development of the Next Generation Grid ... Western Interconnections EAC Recommendations on Smart Grid Research and Development Needs

  18. Directory of Potential Stakeholders for DOE Actions under NEPA

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE Offices are encouraged to be inclusive in providing potentially interested parties with opportunities to review NEPA documents.  This Directory of Potential Stakeholders for DOE Actions under...

  19. Extension Notice - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notice by Website Administrator Microsoft Word Document icon EXTENSIONNOTICE (2).doc - Microsoft Word Document, 31 KB (31744

  20. DOE Issues Noncompliance Notices for Three Showerhead Models | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Noncompliance Notices for Three Showerhead Models DOE Issues Noncompliance Notices for Three Showerhead Models October 4, 2011 - 4:02pm Addthis The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determination this week to three companies regarding showerheads that violate federal water conservation standards. The federal standard enacted by Congress limits showerhead water consumption to no more than 2.5 gallons per minute. Watermark Designs'

  1. DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Process | Department of Energy Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process DOE Issues Notice of Proposed Rulemaking to Improve Energy Efficiency Enforcement Process September 2, 2010 - 4:46pm Addthis Today, the Department of Energy announced a Notice of Proposed Rulemaking seeking comment on proposed reforms designed to improve its energy efficiency certification and enforcement regulations. "This rulemaking a key step in the Department's

  2. EIS-0423: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement and Notice of Public Hearings | Department of Energy Draft Environmental Impact Statement and Notice of Public Hearings EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Long-Term Management and Storage of Elemental Mercury Download Document EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings (38.97 KB) More Documents & Publications EIS-0423: DOE Notice of

  3. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions (DOE, 2003)

    Broader source: Energy.gov [DOE]

    DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions.

  4. EIS-0423: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    (DOEEIS-0423D)(75FR4801)(January 29, 2010) More Documents & Publications EIS-0423-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0423: DOE...

  5. DOE Notice of Proposed Rulemaking to Amend the External Power...

    Energy Savers [EERE]

    Power Supply Test Procedure; Docket No. EERE-2014-BT-TP-0043 RIN 1904-AD36 DOE Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. ...

  6. DOE Secretarial Notice: National Environmental Policy Act (February 5, 1990, status: cancelled)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Secretarial Notice announced revisions of DOE compliance procedures under the National Environmental Policy Act.

  7. Federal Register Notice, Amending 10 CFR part 707, Workplace Ssubustance Abuse Programs at DOE Sites

    Broader source: Energy.gov [DOE]

    Federal Register Notice, Amending 10 CFR part 707, Workplace Ssubustance Abuse Programs at DOE Sites

  8. DOE Webinar: Translating Behavior Change Research Into Consumer Action |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Webinar: Translating Behavior Change Research Into Consumer Action DOE Webinar: Translating Behavior Change Research Into Consumer Action DOE Webinar: Translating Behavior Change Research Into Consumer Action, May 28, 2013. Webinar slides (4.26 MB) More Documents & Publications Incorporating Behavior Change Efforts Into Energy Efficiency Programs Outreach to Faith--Based Organizations SERC Community-Based Social Marketing for Weatherization Programs Webinar

  9. Motivate Homeowner Action With Updated DOE Incentives Database | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Motivate Homeowner Action With Updated DOE Incentives Database Motivate Homeowner Action With Updated DOE Incentives Database Is customer motivation a barrier to marketing upgrades in your community? You can find ideas for incentives faster with DOE's updated Database of State Incentives for Renewables and Efficiency (DSIRE). In addition to pinpointing opportunities in a variety of formats (e.g., dynamic maps, charts, tables), the database includes a search tool that filters

  10. DOE Announces Additional Energy Efficiency Enforcement Action to Protect

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumers | Department of Energy Energy Efficiency Enforcement Action to Protect Consumers DOE Announces Additional Energy Efficiency Enforcement Action to Protect Consumers January 7, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has entered into a Consent Decree with Haier America resolving an investigation into whether Haier violated DOE's energy efficiency standards. DOE's investigation led Haier to determine that a parts defect caused certain

  11. EIS-0375: DOE Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 5: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste The U.S. Department of Energy (DOE) announces the availability of its Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375), prepared

  12. EIS-0382: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of 36 million in cofunding, through a...

  13. Directory of Potential Stakeholders for DOE Actions under NEPA (DOE, 2016)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE Offices are encouraged to be inclusive in providing potentially interested parties with opportunities to review NEPA documents.  This Directory of Potential Stakeholders for DOE Actions under...

  14. Directory of Potential Stakeholders for DOE Actions under NEPA (DOE, 2015)

    Broader source: Energy.gov [DOE]

    DOE Offices are encouraged to be inclusive in providing potentially interested parties with opportunities to review NEPA documents.  This Directory of Potential Stakeholders for DOE Actions under...

  15. DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certify Air Conditioners and Heat Pumps | Department of Energy Institutes Enforcement Action Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps February 4, 2010 - 1:58pm Addthis Washington, DC - The Department of Energy's Office of General Counsel has issued a Notice of Proposed Civil Penalty to AeroSys, Inc. for failing to file certification reports or

  16. EAC Recommendations for DOE Action Regarding the Race to the...

    Broader source: Energy.gov (indexed) [DOE]

    the Race to the Top Initiative, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on the Race to the Top Initiative - June 6, 2013 More Documents &...

  17. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Office of Environmental Management (EM)

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  18. EIS-0486: DOE Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a final EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed Project would include an overhead ± 600-kilovolt

  19. double-action | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reversible Ionic Liquids as Double-Action Solvents for Efficient CO2 Capture Project No.: DE-NT0005287 In this project, the Georgia Tech Research Corporation is using totally novel chemistryto engender the dramatic changes needed for widespread implementation of CO2 capture in a both environmentally benign and economical process. Current methods of CO2 post-combustion recovery from coal-fired power plants focus on such techniques as absorption in aqueous ethanolamine scrubbers - and this is now

  20. Microsoft Word - FR Notice - DOE CMS RFI 02-03-2016 FINAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6450-01-P DEPARTMENT OF ENERGY Request for Information (RFI) for Updated Critical Materials Strategy AGENCY: Office of Energy Policy and Systems Analysis, Department of Energy ACTION: Notice of Request for Information (RFI) SUMMARY: In 2010, the U.S. Department of Energy (DOE) developed and issued a Critical Materials Strategy report addressing the role of rare earth and other materials in energy technologies and processes. An update and additional analyses were completed the following year. In

  1. Midea: Penalty Notice Withdrawal (2010-SE-0110)

    Broader source: Energy.gov [DOE]

    DOE withdrew its January 26, 2012 Notice of Proposed Civil Penalty, but retained the right to take further enforcement actions.

  2. EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement and Notice of Public Hearings | Department of Energy 50-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the

  3. EIS-0414: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement and Notice of Public Hearing | Department of Energy 14: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  4. DOE-STD-1128-98 Change Notice Memorandum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    united States Government Department of Energy memorandum DATE: REPLY TO ATTN OF: SUBJECT: TO: J a n u a r y 31, 2005 EH-52:Peter 0' Connell: 3-564 1 CHANGE NOTICE TO DEPARTMENT OF ENERGY (DOE) STANDARD, DOE-STD- 1 128-98 Dennis Kubicki, EH-24 This memorandum forwards changes to subject DOE Technical Standard, DOE-STD-1128- 98, "Guide of Good Practices for Occupational Radiological Protection in Plutonium Facilities." The changes are being made as part of a review of the document

  5. EIS-0375: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement (152.08 KB) More Documents & Publications EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: Final

  6. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial ...

  7. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance ...

  8. EIS-0423: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Final Environmental Impact Statement EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Download Document EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement (56.31 KB) More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final

  9. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    17 Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices Issued at Washington, DC, on February 21, 2012. LaTanya R. Butler, Acting Deputy Committee Management Officer. [FR Doc. 2012-4461 Filed 2-24-12; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY [OE Docket No. RRTT-IR-001] Rapid Response Team for Transmission AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy, DoE. ACTION: Request for information. SUMMARY: The Department of Energy's

  10. DOE-ID Procurement Services � the action team

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s

  11. Notice of Office of Management and Budget Action to Approve with Change the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants | Department of Energy a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change as an emergency action for six months the

  12. EIS-0407: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas E9-22920.pdf (138.89 KB) More Documents & Publications EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact

  13. EIS-0349: DOE Notice of Availability of the Record of Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cogeneration Project, Washington and Oregon This notice announces the availability of the ROD to implement the proposed action identified in the BP Cherry Point Cogeneration ...

  14. EAC Recommendations for DOE Action Regarding U.S. Electric Grid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Electric Grid Resiliency - March 2014 EAC Recommendations for DOE Action Regarding U.S. Electric Grid Resiliency - March 2014 EAC Recommendations for DOE Action Regarding U.S. ...

  15. EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis |

    Energy Savers [EERE]

    Department of Energy 60: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, Clive, Utah The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low- level radioactive waste disposal facility at the Nevada Test Site (NTS) or at

  16. EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise Security Governance- March 2014

    Broader source: Energy.gov [DOE]

    EAC Recommendations for DOE Action Regarding Implementing Effective Enterprise Security Governance, approved at the March 12-13, 2014 meeting.

  17. EAC Recommendations for DOE Action Regarding the Power Marketing Administrations- June 18, 2012

    Broader source: Energy.gov [DOE]

    EAC Recommendations for DOE Action Regarding the Power Marketing Administrations, approved at the June 11-12, 2012 EAC Meeting.

  18. EAC Recommendations for DOE Action Regarding the Electricity Workforce- October 17, 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    EAC Recommendations for DOE Action Regarding the Electricity Workforce, approved at the October 15-16, 2012 EAC Meeting.

  19. EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Tennessee Valley Authority (TVA) and other domestic commercial nuclear power reactors. ... PDF icon EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental Environmental ...

  20. Other Notices | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0463 and EIS-0463-S1: DOE Notice of Public Hearings Northern Pass Transmission Line Project, New Hampshire November 4, 2015 EA-2005: Notice of Proposed Floodplain Action...

  1. Notice of Intent to Develop DOE G 415.1-2, Information Technology...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G 415.1-2, Notice of Intent to Develop DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium IT Projects by Denise Hill The proposed DOE G...

  2. Notice of Office of Management and Budget Action to Approve with Change the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants | Department of Energy an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection

  3. EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the availability of a Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DOE-NOA-DEIS-2013.pdf (202.73 KB) More Documents & Publications Uranium

  4. EA-1792-S1: DOE Notice of Availability of the Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment | Department of Energy -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating

  5. EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental

    Office of Environmental Management (EM)

    Programmatic Environmental Impact Statement and Notice of Public Hearings | Department of Energy Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings Complex Transformation The Draft Complex Transformation SPEIS analyzes the potential environmental impacts of reasonable alternatives to continue the transformation

  6. EAC Recommendations for DOE Action Regarding Non-Wires Solutions - October

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    17, 2012 | Department of Energy Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires Solutions - October 17, 2012 EAC Recommendations for DOE Action Regarding Non-Wires Solutions, approved at the October 15-16, 2012 EAC Meeting. EAC Recommendations for DOE Action on Non-Wires Solutions - October 17, 2012 (388.91 KB) More Documents & Publications DOE Response to 2012 EAC Recommendations - February 2013 National Electric Transmission Congestion

  7. DOE - NNSA/NFO -- Disclaimer, Privacy and Security Notice

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Disclaimer, Privacy and Security Notice NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Privacy and Security Notice Information from this server resides on a computer ...

  8. Risk assessment in the DOE Assurance Program for Remedial Action

    SciTech Connect (OSTI)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

  9. DOE Institutes Enforcement Action against 4 Showerhead Manufacturers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, ...

  10. EIS-0236-S4: DOE Notice of Availability of the Supplemental Programmatic

    Office of Environmental Management (EM)

    Environmental Impact Statement | Department of Energy DOE Notice of Availability of the Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: DOE Notice of Availability of the Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), a separately-organized agency within the U.S. Department of Energy (DOE), announces the availability of the Complex Transformation Supplemental Programmatic Environmental

  11. EIS-0336: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement and Public Hearings | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact

  12. EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a separately-organized agency within the Department of Energy (DOE), announces the availability of the Draft Site-Wide Environmental Impact Statement for the Y-12 National Security

  13. EA-0387: DOE Notice of Availability of the Final Site-Wide Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy 387: DOE Notice of Availability of the Final Site-Wide Environmental Impact Statement EA-0387: DOE Notice of Availability of the Final Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the Department of Energy (DOE), announces the availability of the Final Site-Wide Environmental Impact Statement for the Y-12 National Security

  14. USDA & DOE Release National Biofuels Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    USDA & DOE Release National Biofuels Action Plan USDA & DOE Release National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis WASHINGTON - Department of Agriculture (USDA) Secretary Ed Schafer and Department of Energy (DOE) Secretary Samuel W. Bodman today released the National Biofuels Action Plan (NBAP), an interagency plan detailing the collaborative efforts of Federal agencies to accelerate the development of a sustainable biofuels industry. "Federal leadership can provide

  15. EAC Recommendations for DOE Action Regarding U.S. Electric Grid Resiliency- March 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    EAC Recommendations for DOE Action Regarding U.S. Electric Grid Resiliency, approved at the March 12-13, 2014 meeting.

  16. EAC Recommendations for DOE Action Regarding the CSG Interstate Transmission Siting Compact- June 6, 2013

    Broader source: Energy.gov [DOE]

    EAC Recommendations for DOE Action Regarding the CSG Interstate Transmission Siting Compact, approved at the June 5-6, 2013 EAC Meeting.

  17. Extension Notice Summary Sheet - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Notice Summary Sheet by Website Administrator Microsoft Word Document icon ExtNoticeSummarySheet3-15-10 (2).doc - Microsoft Word Document, 25 KB (26112

  18. EIS-0396: DOE Notice of Availability of the Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0396: Notice of Intent to Prepare a Programmatic Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental ...

  19. DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission Line Project, New Hampshire EPA announces that DOE has extended the public comment period for the Draft Environmental Impact Statement for the Northern Pass Transmission Line Project (DOE/EIS-0463) to April 4, 2016. Comments submitted to DOE concerning the Northern Pass Draft EIS prior to this

  20. Text Processing a Policy or Notice - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Processing a Policy or Notice Processing a Policy or Notice Processing an Order or Guide Canceling a Directive by Website Administrator Development from justification memorandum through review to publication Justification Memorandum (Initial step towards developing a Policy or Notice) Office of Primary Interest (OPI) Creates a justification memorandum for a non-NNSA element or a justification memorandum for NNSA element to develop a Policy or Notice. Obtains the signature of the

  1. DOE Issues Two Notices Seeking Comment on the Implementation of Its

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certification and Enforcement Rules | Department of Energy Two Notices Seeking Comment on the Implementation of Its Certification and Enforcement Rules DOE Issues Two Notices Seeking Comment on the Implementation of Its Certification and Enforcement Rules April 21, 2011 - 5:08pm Addthis Last week, the Department of Energy issued two Notices related to the application of its certification and enforcement regulations. First, the Department issued a Request for Information seeking information

  2. DOE Issues a Supplemental Notice of Proposed Rulemaking Pertaining to Test

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Cooking Products | Department of Energy Supplemental Notice of Proposed Rulemaking Pertaining to Test Procedures for Cooking Products DOE Issues a Supplemental Notice of Proposed Rulemaking Pertaining to Test Procedures for Cooking Products Cooking Products_ECS_SNOPR (571.32 KB) More Documents & Publications 2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking ISSUANCE 2015-06-18: Energy Conservation Program:

  3. NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION

    Broader source: Energy.gov (indexed) [DOE]

    10132011 ACTION REQUESTED: Revision of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201110-1910-001 AGENCY ICR TRACKING NUMBER:...

  4. DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act

    Broader source: Energy.gov [DOE]

    Today, in response to a formal request, General Counsel Scott Blake Harris approved a 30-day extension of the public comment period on DOE's Notice of Inquiry (75 FR 43945) soliciting comment on...

  5. DOE Extends Comment Period on Notice of Inquiry Under the Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    extension of the public comment period to November 30, 2010 on DOE's Notice of Inquiry (75 FR 43945) soliciting comment on the development of regulations to carry out section 934...

  6. DOE Issues Notice of Proposed Rulemaking for Electric Motors Energy Conservation Standards

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register notice of proposed rulemaking regarding energy conservation standards for certain commercial and industrial electric motors, under subpart B of Title 10 of the Code of Fe

  7. Notice of Intent to Develop DOE G 436.1-1, Sustainable Print...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    promote energy security, protect the interests of taxpayers, and safeguard the health of the environment. Notice of Intent to Develop DOE G 436.1-1, Sustainable Print Management...

  8. DOE - Office of Legacy Management -- Notice_LEHR_CERCLA_FiveYearReview

    Office of Legacy Management (LM)

    Notice of LEHR CERCLA Five-Year Review The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is conducting the first Five-Year Review of the remedies for the ...

  9. DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period...

    Office of Environmental Management (EM)

    DOEEIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission Line Project, New Hampshire EPA announces that DOE has extended the public ...

  10. EIS-0385: Notice of Proposed Floodplain and Wetland Actions ...

    Broader source: Energy.gov (indexed) [DOE]

    Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by...

  11. EIS-0355: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's

  12. EIS-0226: DOE Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy (referred to as the Final Decommissioning and/or Long-Term Stewardship EIS or ''Final EIS''). DOE/EIS-0226, Notice of Availability of the Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center, 75 FR 4803 (January 2010) (46.73 KB) More Documents & Publications EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement

  13. DOE Announces Notice of Intent to Issue Funding Opportunity for Tribal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Energy Projects | Department of Energy Announces Notice of Intent to Issue Funding Opportunity for Tribal Clean Energy Projects DOE Announces Notice of Intent to Issue Funding Opportunity for Tribal Clean Energy Projects May 30, 2014 - 5:39pm Addthis The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Tribal Energy Program is pleased to announce its intent to issue a funding opportunity announcement (FOA). The EERE Tribal Energy Program, in

  14. DOE Notice of inquiry and request for comment. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of inquiry and request for comment. DOE Notice of inquiry and request for comment. DOE is seeking comment and information from the public to assist in its development of regulations pertaining to section 934 of the Energy Independence and Security Act of 2007 (''Act''). Section 934 addresses how the United States will meet its obligations under the Convention on Supplementary Compensation for Nuclear Damage (''Convention'' or ''CSC'') and, in particular, its obligation to contribute to an

  15. EIS-0473: DOE Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of a Draft Environmental Impact Statement EIS-0473: DOE Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the availability of the Draft Environmental Impact Statement for the W.A. Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE/EIS-0473D) for public review and comment, as well as the

  16. Chromium Project Notice of Proposed Floodplain Action Public Comment Period Closes November 20th,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chromium Project Notice of Proposed Floodplain Action Public Comment Period Closes November 20th, 2015 The Department of Energy Environmental Management Los Alamos Field Office has prepared a Draft Environmental Assessment for the Chromium Plume Control Interim Measure and Plume-Center Characterization at the Los Alamos National Laboratory (LANL). The proposed action may include well pad and access road installation and maintenance, piezometer placement, and pipeline placement in the 100-year

  17. EIS-0375: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Department of Energy, Notice of...

  18. EA-1656: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EA-1656: Finding of No Significant Impact EA-1656: Final Environmental Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment...

  19. EIS-0444: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement and Public Hearing Notice for the Texas Clean Energy Project, near Odessa, Ector County, Texas, DOEEIS-0444 (March 2011 - 76...

  20. EIS-0486: DOE Notice of Public Comment Period Extension | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Public Comment Period Extension EIS-0486: DOE Notice of Public Comment Period Extension Plains & Eastern Clean Line Transmission Project DOE is extending the public comment period for the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS-0486) to April 20, 2015. Comments submitted to DOE concerning the Plains & Eastern EIS prior to this announcement do not need to be resubmitted as a result of this extension of the

  1. Status Update on Action 2d: Discussion of DEAR ISM Clause in DOE Contracts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Status Update on Action 2d: Discussion of DEAR ISM Clause in DOE Contracts Status Update on Action 2d: Discussion of DEAR ISM Clause in DOE Contracts Addthis Description Slide Presentation by Patricia Worthington, PhD, Director Office of Health and Safety, Office of Health Safety and Security. Regulatory Aspects of ISM--Evaluating current ISM clause in DOE Contracts

  2. EAC Recommendations for DOE Action Regarding Implementing Effective...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Responses to EAC Work Products - June 2014 Electricity Advisory Committee Meeting Presentations June 2013 - Wednesday, June 5, 2013 Electricity Subsector Cybersecurity ...

  3. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Department of Energy has received information that the showerhead models referenced below may exceed the federal maximum water flow rate. DOE's regulations permit the ...

  4. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Federal Register / Vol. 80, No. 224 / Friday, November 20, 2015 / Notices ACTION: Notice of document availability. SUMMARY: Copies of the Bonneville Purchasing Instructions (BPI), which contain the policy and establish the procedures that BPA uses in the solicitation, award, and administration of its purchases of goods and services, including construction, are available in printed form or at the following Internet address: http://www.bpa.gov/corporate/ business/bpi. Copies of the Bonneville

  5. DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    DOEOFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. ... United States Department of Energy I OakRidgeOpcrationsOfficc Under Contract No. DE-AC059 ...

  6. EAC Recommendations for DOE Action Regarding the Race to the Top Initiative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - June 6, 2013 | Department of Energy the Race to the Top Initiative - June 6, 2013 EAC Recommendations for DOE Action Regarding the Race to the Top Initiative - June 6, 2013 EAC Recommendations for DOE Action Regarding the Race to the Top Initiative, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on the Race to the Top Initiative - June 6, 2013 (95.02 KB) More Documents & Publications Electricity Advisory Committee Meeting Presentations June 2013 -

  7. Text Processing a Policy or Notice - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emails a Microsoft Word file of the draft Policy or Notice to the MA-90 Analyst. MA-90 ... Submits comments the DRB Liaison. DRB Liaison Consolidates and emails DRB comments to the ...

  8. Processing a Policy or Notice - DOE Directives, Delegations,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Emails a Microsoft Word file of the draft Policy or Notice to the MA-90 Analyst. DRB ... Emails redlinedstrikeout file to the DRB Liaison by due date. DRB Liaison Disseminates ...

  9. EIS-0391: DOE Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Application to Export Electric Energy OE Docket No. EA-387 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012...

  10. Motivate Homeowner Action With Updated DOE Incentives Database...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    marketing upgrades in your community? You can find ideas for incentives faster with DOE's updated Database of State ... Interactive maps users can customize in real-time based on ...

  11. Notice of Intent to Revise DOE O 313.1, Management and Funding of the

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department's Overseas Presence - DOE Directives, Delegations, and Requirements JM-DOE O 313.1, Notice of Intent to Revise DOE O 313.1, Management and Funding of the Department's Overseas Presence by Laura Smiley In fiscal year 2014 the Department moved to funding the overseas presence via the Working Capital Fund (WCF) from the earlier, ad hoc, individual program office contribution schema. This new WCF approach needs to be reflected in the Order, as well as several administrative changes

  12. DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure...

    Office of Environmental Management (EM)

    to Certify Air Conditioners and Heat Pumps DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps February 4, 2010 - 1:58pm ...

  13. U.S. District Court Upholds DOE's Action Against LG to Enforce ENERGY STAR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements | Department of Energy District Court Upholds DOE's Action Against LG to Enforce ENERGY STAR Requirements U.S. District Court Upholds DOE's Action Against LG to Enforce ENERGY STAR Requirements January 19, 2010 - 12:00am Addthis Washington, D.C. - On Monday, the United States District Court for the District of Columbia upheld the Department of Energy's decision to remove the ENERGY STAR® label from certain inefficient LG refrigerator-freezer models. As part of its expanded

  14. DOE Announces Notice of Intent for EGS Observatory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent for EGS Observatory DOE Announces Notice of Intent for EGS Observatory February 21, 2014 - 12:00am Addthis The Energy Department announced today its intent to issue a funding opportunity to establish a dedicated subsurface laboratory called the Frontier Observatory for Research in Geothermal Energy (FORGE). This first-of-its-kind effort will promote transformative and high-risk/high-reward science and engineering focused on addressing critical barriers to Enhanced Geothermal

  15. DOE Issues a Notice of Public Meeting Pertaining to the Appliance Standards

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Rulemaking Federal Advisory Committee (ASRAC) | Department of Energy Issues a Notice of Public Meeting Pertaining to the Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) DOE Issues a Notice of Public Meeting Pertaining to the Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) Appliance Standards and Rulemaking Federal Advisory Committee_Public Meeting (282.06 KB) More Documents & Publications Appliance Standards and Rulemaking Federal Advisory

  16. DOE Issues a Notice of Proposed Rulemaking and Announcement of Public

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Pertaining to Test Procedure for Walk-in Coolers and Walk-in Freezers | Department of Energy NOPR_Public Meeting_Notice (663.4 KB) More Documents & Publications CX-008013: Categorical Exclusion Determination DOE Issues a Notice of Proposed Rulemaking and Announcement of Public Meeting Pertaining to Test Procedure for Walk-in Coolers and Walk-in Freezers 2014-05-08 Issuance: Energy Conservation Standards for Walk-in Coolers and Freezers; Final Rule

  17. EIS-0337: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    Impact Statement West Valley Demonstration Project Waste Management DOE's ... Impact Statement, West Valley Demonstration Project Waste Management Environmental ...

  18. Notices

    Office of Environmental Management (EM)

    for Corporate Performance Management to DoD.'' Meeting Agenda: 12:30 p.m.-1:45 p.m. ... U.S. Navy F-35C West Coast Homebasing AGENCY: Department of the Navy, DoD. ACTION: Notice. ...

  19. DOE Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Violate Federal Energy Efficiency Appliance Standards | Department of Energy Action to Stop the Sales of Air-Con Air Conditioner Models Shown to Violate Federal Energy Efficiency Appliance Standards DOE Takes Action to Stop the Sales of Air-Con Air Conditioner Models Shown to Violate Federal Energy Efficiency Appliance Standards September 23, 2010 - 12:00am Addthis Washington, DC - The Department of Energy announced today that it has taken action against Air-Con, International, requiring

  20. Approval Memorandum for Policies, Notices, Orders and Manuals - DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directives, Delegations, and Requirements Memorandum for Policies, Notices, Orders and Manuals by Patricia Greeson Upload File Upload the file here ApprovalMemo-DeputySecretary6-29-16.docx - 23 KB Short Name approval-memo-dep-sec

  1. DOE Notice of Proposed Rulemaking to Amend the External Power Supply Test

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedure; Docket No. EERE-2014-BT-TP-0043 / RIN 1904-AD36 | Department of Energy Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. EERE-2014-BT-TP-0043 / RIN 1904-AD36 DOE Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. EERE-2014-BT-TP-0043 / RIN 1904-AD36 On 12/19/2014, Apple Inc. met with DOE to discuss the Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure. EPS TP Ex Parte

  2. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    112 Federal Register / Vol. 79, No. 101 / Tuesday, May 27, 2014 / Notices LNG export application(s) previously approved on domestic natural gas supply and demand fundamentals. DOE may also consider other factors bearing on the public interest, including the impact of the proposed exports on the U.S. economy (including GDP, consumers, and industry), job creation, the U.S. balance of trade, and international considerations; and whether the authorization is consistent with DOE's policy of promoting

  3. Report of the DOE-DOE Workshop on Fuel Cells in Aviation: Workshop Summary and Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of 43 Page i DOD-DOE Workshop Summary and Action Plan: Fuel Cells in Aviation Table of Contents Executive Summary .............................................................................................................................................iii Drivers for Leaner, Cleaner Energy Use in Aviation .......................................................................... iv The Opportunity for Hydrogen and Fuel Cell Technologies in Aviation

  4. EIS-0408: DOE Notice of Availability of a Programmatic Draft...

    Broader source: Energy.gov (indexed) [DOE]

    jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy...

  5. EIS-0414: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez ...

  6. EIS-0431: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carbon Capture and Sequestration Project, Kern County, CA DOE announces the availability ... Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. ...

  7. EA-1773: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze...

  8. EIS-0336: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP...

  9. EIS-0450: DOE Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the TransWest Express Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies...

  10. EIS-0499: DOE Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    Great Northern Transmission Line Project, Minnesota The U.S. Department of Energy (DOE) ... to grant a Presidential permit to Minnesota Power to construct, operate, maintain, ...

  11. DOE Notice of Inquiry on the Convention on Supplementary Compensation for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Damage (CSC) Contingent Cost Allocation - March 2, 2011 Meeting with CIGNL | Department of Energy Inquiry on the Convention on Supplementary Compensation for Nuclear Damage (CSC) Contingent Cost Allocation - March 2, 2011 Meeting with CIGNL DOE Notice of Inquiry on the Convention on Supplementary Compensation for Nuclear Damage (CSC) Contingent Cost Allocation - March 2, 2011 Meeting with CIGNL On March 2, 2011, representatives of CIGNL met at the Forrestal Building with DOE

  12. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices 1 On Oct. 10, 2014, Trunkline LNG Export, LLC filed a request in DOE/FE Dkt. No. 13-04-LNG to change its corporate name to Lake Charles LNG Export Company, LLC. Subsequently, DOE/FE issued Order 3252-A granting the name change. See Lake Charles LNG Export Company, LLC, DOE/FE Order No. 3252-A, FE Dkt. No. 13-04-LNG (March 18, 2015). 2 The authority to regulate the imports and exports of natural gas, including liquefied

  13. Notice of Intent to Develop DOE O 470.X, Insider Threat Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-10-17

    The Order establishes top-level responsibilities and requirements for DOE's Insider Threat Program, which is intended to deter, detect, and mitigate insider threat actions by all Federal and contractor employees.

  14. DOE Notice of Inquiry on the Convention on Supplementary Compensation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This summary of the meeting is being provided to memorialize the discussions in accordance with DOE's Guidance on Ex Parte Communications. 74 Fed.Reg. 52795 (Oct. 14, 2009). PDF ...

  15. EIS-0473: DOE Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX ... Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE...

  16. EIS-0226: DOE Notice of Availability of the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Decommissioning andor Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) announces the...

  17. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

  18. DOE/EV-0005/10 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    0 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohio February 1979 - Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology DOE/EV-0005/10 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohii February 1979 Final Report Prepared

  19. DOE/EV-0005/19 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    9 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980 . Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology ~--.. _..-- DOE/EV-0005/19 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiologidal Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980

  20. EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System (Energy Management System)- October 17, 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System, approved at the October 15-16, 2012 EAC Meeting.

  1. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    54 Federal Register / Vol. 79, No. 7 / Friday, January 10, 2014 / Notices that, effective March 12, 2009, it changed its legal name to NextEra Energy Power Marketing, LLC. Accordingly, on March 26, 2009, DOE issued Order No. EA-348-A, in which it amended the original order by changing the name of the authorized exporter to NEPM. All other terms and conditions of Order No. EA-348 remained unchanged. On December 20, 2013, NEPM filed an application with DOE for renewal of the export authority

  2. Notice of Intent to Revise DOE O 470.4B, Safeguards and Security Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - DOE Directives, Delegations, and Requirements O 470.4B, Notice of Intent to Revise DOE O 470.4B, Safeguards and Security Program by Diane Johnson The directive is proposed for revision to reflect the establishment by the Secretary of Energy of the Office of Environment, Health, Safety and Security (AU), and the Office of Security Officer positions and the Security Committee. The responsibilities section of the Order will be revised to include the Chief Security Officers and the Security

  3. Notices TABLE

    Broader source: Energy.gov (indexed) [DOE]

    Environmental Protection Agency (EPA). ACTION: Notice of a final decision on a no migration petition reissuance. SUMMARY: Notice is hereby given that a reissuance of an...

  4. Notices ACTION: Notice.

    Broader source: Energy.gov (indexed) [DOE]

    ...07 2015, Contact: Dr. Julie Ann Smith 202-586-7668. EIS No. 20150311, Draft, GSA, DC, FBI Headquarters Consolidation, Comment Period Ends: 01062016, Contact: Denise Decker ...

  5. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61 Federal Register / Vol. 79, No. 107 / Wednesday, June 4, 2014 / Notices invite comments on the LCA GHG Report, as applied to the pending matters. The LCA GHG Report The LCA GHG Report was conducted by the National Energy Technology Laboratory (NETL), a DOE laboratory. The LCA GHG Report estimates the life cycle GHG emissions of U.S. LNG exports to Europe and Asia, compared with alternative supplies, to produce electric power. For additional information on the natural gas model, refer to the

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    443 Federal Register / Vol. 79, No. 179 / Tuesday, September 16, 2014 / Notices 1 Cameron LNG, LLC, 134 FERC ¶ 61,049 (2011). 2 Cameron previously sought authorization to export the same quantity of LNG to any country with which the United States has, or in the future may enter into, a FTA requiring national treatment for trade in natural gas (FTA countries). DOE/FE granted that FTA authorization by order dated January 17, 2012. Department published in the Federal Register, in text or Adobe

  7. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    101 Federal Register / Vol. 79, No. 224 / Thursday, November 20, 2014 / Notices 1 Freeport LNG Expansion L.P. and FLNG Liquefaction, LLC, DOE/FE Order No. 3282, FE Docket No. 10-161-LNG, Order Conditionally Granting Long-Term Multi-Contract Authorization to Export Liquefied Natural Gas by Vessel from the Freeport LNG Terminal on Quintana Island, Texas to Non-Free Trade Agreement Nations (May 17, 2013). 2 15 U.S.C. 717b(a). This authority is delegated to the Assistant Secretary for Fossil Energy

  8. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    88 Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Notices 1 DOE suspended disposal activities at WIPP in February 2014 following a salt truck fire and unrelated radiological event underground. Waste emplacement operations at WIPP are expected to commence in late 2016. to 9:30 p.m. CDT. Informal poster sessions will be held from 4:00 p.m. until 5:00 p.m. CDT and again after 9:30 p.m. CDT. Department officials will be available to discuss consent-based siting during the poster

  9. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1622 Federal Register / Vol. 81, No. 97 / Thursday, May 19, 2016 / Notices http://www.fe.doe.gov/programs/ gasregulation/index.html. Issued in Washington, DC, on May 13, 2016. John A. Anderson, Director, Office of Regulation and International Engagement, Office of Oil and Natural Gas. [FR Doc. 2016-11812 Filed 5-18-16; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY [OE Docket No. PP-420] Application for Presidential Permit; Nogales Interconnection Project AGENCY: Office of Electricity

  10. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    45139 Federal Register / Vol. 81, No. 133 / Tuesday, July 12, 2016 / Notices Policy and Compliance (GC-54), U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585, (202) 586-4600, or leave a message at (800) 472-2756. This Amended ROD, the SA, and related NEPA documents are available on the DOE NEPA Web site at www.energy.gov/ nepa. SUPPLEMENTARY INFORMATION: Background Y-12 is NNSA's primary site for uranium operations, including EU processing and storage, and is one of

  11. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal ...

  12. NOTICE: National Nuclear Security Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    47 1 April 2013 NOTICE: National Nuclear Security Administration ACTION: Finding of No Significant Impact; Environmental Assessment for the Transfer of the Kansas City Plant, Kansas City, Missouri (DOE/EA-1947) - Revision 1.0 DATE: June 29, 2016 1) CHANGED ACTION: Since the May 1, 2013 Finding of No Significant Impact (FONSI) and Environmental Assessment for the Transfer of the Kansas City Plant, Kansas City, Missouri (DOE/EA-1947; KCP EA), the proposed federal action has evolved and a decision

  13. DOE/OR/20722-84 Formerly Utilized Sites Remedial Action Program

    Office of Legacy Management (LM)

    ur/ /1-( DOE/OR/20722-84 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-81 OR2A7 22 IPOST-RE M ED"LA'KtrACTI O N R EPORT FOR i ; , , i ' l : l ' - . . - r r r ^ A ^ R ^ l - l r I A F f - F A F f A A F 6 l T F i'. THE NIAGARA FALLS STORAGE SITE IICINITY PROPERTIES 1983 AND 1984 Lewistoh, New York December 1986 Bechtel lrlatbnal, Ine DOE/OR/ 207 22-8 4 P O S T - R E M E D I A L A C T I O N R E P O R T F O R T H E N ] A G A R A F A L L S S T O R A G E S I T E V I

  14. Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) (DOE, 1997)

    Broader source: Energy.gov [DOE]

    This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program."

  15. DOE/OR/20722-22 UC-70A DBaffu Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    22 UC-70A DBaffu Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 c P c P RADIOLOGICAL SURVEY REPORT FOR THE DUPONT CHAMBER WORKS PLANT Deepwater, New Jersey Bechtel National, Inc. Advanced Technology Division June 1984 Technical Information Center Office of Scientific and Technical Information U.S. Department of Energy -- .,,.... - ~S",.W -. - - -. _ -- --- --.- ----.-- ___ ..---. -.~ LEGAL NOTICE ' I91i.m report war prepared u M account of work

  16. Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride

    Office of Environmental Management (EM)

    869 Federal Register / Vol. 72, No. 63 / Tuesday, April 3, 2007 / Notices DEPARTMENT OF EDUCATION The Historically Black Colleges and Universities Capital Financing Advisory Board AGENCY: The Historically Black Colleges and Universities Capital Financing Board, Department of Education. ACTION: Notice of an open meeting. SUMMARY: This notice sets forth the schedule and proposed agenda of an upcoming open meeting of the Historically Black Colleges and Universities Capital Financing Advisory Board.

  17. DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEEIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension DOEEIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission...

  18. DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for commercial refrigeration equipment.

  19. EIS-0236-S4: DOE Notice of Availability of the Supplemental Programmat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of the Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), a...

  20. EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings Complex Transformation The Draft Complex Transformation SPEIS analyzes the potential...

  1. DOE Publishes Notice of Proposed Rulemaking for Residential Furnace Fans Energy Conservation Standards

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy has published a notice of proposed rulemaking regarding energy conservation standards for residential furnace fans.

  2. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  3. Notices

    Broader source: Energy.gov (indexed) [DOE]

    6 Federal Register Vol. 80, No. 60 Monday, March 30, 2015 Notices 4 The Advisory Council on Historic Preservation's regulations are at Title 36, Code of Federal Regulations,...

  4. Notices

    Energy Savers [EERE]

    On December 21, 2012, the Notice of Availability of the Final Environmental Impact Statement (EIS) ... Western's Large Generator Interconnection Procedures provide for transmission ...

  5. Notices

    National Nuclear Security Administration (NNSA)

    ... PROTECTION AGENCY FRL-9724-6 Clean Water Act: Availability of List Decisions ... SUMMARY: This notice announces EPA's decision to identify certain water quality limited ...

  6. Notices

    Broader source: Energy.gov (indexed) [DOE]

    Morgan Louisiana Pipeline LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Magnolia LNG and Lake Charles Expansion Projects The staff of the ...

  7. Notices

    Broader source: Energy.gov (indexed) [DOE]

    5 Federal Register Vol. 78, No. 89 Wednesday, May 8, 2013 Notices reporting, please go to www.ed.gov fundgrantapplyappforms appforms.html. 4. Performance Measures: The...

  8. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notices 1 The regional reliability organizations under FPA section 215 are the Florida ... should be considered, and what types of analysis should be performed to ...

  9. DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

  10. DOE Announces Notice of Intent to Issue Hydrogen and Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announces Notice of Intent to Issue Hydrogen and Fuel Cell Research, Development, and ... storage materials research; and cost and performance analysis for hydrogen ...

  11. EIS-0397: DOE Notice of Availability of the Record of Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Availability of the Record of Decision Bonneville Power Administration Lyle Falls Fish Passage Project This notice announces the availability of the Record of Decision to...

  12. EA-1815: DOE Notice of Availability of the Finding of No Significant...

    Broader source: Energy.gov (indexed) [DOE]

    environmental impacts associated with the: Cuyahoga County Agricultural Society Wind Energy Project; Berea, Cuyahoga County, Ohio. Notice of Availability of a Finding of No...

  13. Action 2b Revision of DOE G 226.1-2 with New Guidance for Acitvity...

    Office of Environmental Management (EM)

    ISM Champions Workshop DOE Forrestal HQ Building and Video and Web Conferencing Washington, DC May 15-16, 2013 DOE Response to the DNFSB Technical Report Task 2B Roger Claycomb ...

  14. Action Items

    Office of Environmental Management (EM)

    ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS...

  15. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    64 Federal Register / Vol. 79, No. 247 / Wednesday, December 24, 2014 / Notices SUMMARY: This notice sets forth the schedule and summary agenda for a partially-closed meeting of the President's Council of Advisors on Science and Technology (PCAST), and describes the functions of the Council. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register. DATES: January 9, 2015, 9:00 a.m. to 12:00 p.m. ADDRESSES:

  16. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    426 Federal Register / Vol. 80, No. 62 / Wednesday, April 1, 2015 / Notices 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ''eLibrary'' or from the Commission's Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502-8371. For instructions on connecting to eLibrary, refer to the last page of

  17. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    189 Federal Register / Vol. 80, No. 127 / Thursday, July 2, 2015 / Notices 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov Continued Dated: June 24, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015-16308 Filed 7-1-15; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PF15-18-000 and PF15-19-

  18. Final Week of National Energy Action Month Features Technological Advances in Clean Energy and DOE Support of Scientific Research

    Broader source: Energy.gov [DOE]

    WASHINGTON—Department of Energy officials will attend events across the country next week to highlight the clean energy technological advances and scientific initiatives supported by DOE. During the final week of National Energy Action Month, senior DOE officials will participate in events from San Francisco to North Carolina to Washington. Throughout October, Secretary of Energy Ernest Moniz and other Department officials are participating in events to emphasize the important role that the Administration’s all-of-the-above energy strategy plays in strengthening America’s economic, environmental and national security future.

  19. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect (OSTI)

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  20. Notices

    Broader source: Energy.gov (indexed) [DOE]

    7489 Federal Register Vol. 80, No. 152 Friday, August 7, 2015 Notices Dated: August 3, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. FR Doc. 2015-19420 Filed 8-6-15; 8:45...

  1. Notices

    National Nuclear Security Administration (NNSA)

    ... Water consumption would vary, primarily because of the length of the corridor, ranging ... am BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Notice of Intent to Prepare an ...

  2. Notices

    Broader source: Energy.gov (indexed) [DOE]

    ... export LNG both on its own behalf and as agent for other parties who hold title to the ... on DSK5VPTVN1PROD with NOTICES 28257 Federal Register Vol. 80, No. 95 Monday, May ...

  3. Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Louisiana LNG Energy, LLC Docket No. PF14-17-000 SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED MISSISSIPPI RIVER LNG PROJECT, AND ...

  4. Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Louisiana LNG Energy, LLC Docket No. PF14-17-000 SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED MISSISSIPPI RIVER LNG PROJECT, AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES RELATED TO PROJECT CHANGES (September 30, 2015) On October 3, 2014, the Federal Energy Regulatory Commission (FERC or Commission) issued in Docket No. PF14-17-000 a Notice of Intent to Prepare an Environmental Impact Statement for the Planned Mississippi River LNG Project and

  5. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    206 Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices Authority: 15 U.S.C. 2601 et seq. Dated: November 5, 2015. Pamela Myrick, Acting Director, Information Management Division, Office of Pollution Prevention and Toxics. [FR Doc. 2015-28842 Filed 11-12-15; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9023-9] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202)

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    519 Federal Register / Vol. 77, No. 118 / Tuesday, June 19, 2012 / Notices send you a Grant Award Notification (GAN). We may notify you informally, also. If your application is not evaluated or not selected for funding, we notify you. 2. Administrative and National Policy Requirements: We identify administrative and national policy requirements in the application package and reference these and other requirements in the Applicable Regulations section of this notice. We reference the regulations

  7. Notices

    National Nuclear Security Administration (NNSA)

    4222 Federal Register / Vol. 77, No. 145 / Friday, July 27, 2012 / Notices alternatives carried forward for detailed study, is disclosed in Chapter 2 of the Final EIS. 6. Scoping Process: A Notice of Intent to prepare a Draft EIS for the Proposed Point Thomson Project was published in the Federal Register on December 4, 2009. The Corps of Engineers conducted public scoping, Alaska Native Tribal consultations, and resource agency meetings in AK prior to preparing the Draft EIS. Over 300

  8. Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979.

  9. Report of the DOE-DOE Workshop on Fuel Cells in Aviation: Workshop Summary and Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report discusses the results of a September 30, 2010, workshop focusing on the development and installation of fuel cells for auxiliary power on board U.S. Department of Defense (DOD) aircraft. DOD and DOE are collaborating under a Memorandum of Understanding (MOU) to pursue technology-driven solutions that reduce petroleum use, among other objectives. One of the solutions being explored under the MOU is the use of hydrogen and fuel cell applications to curb the use of logistics fuel across several DOD agencies.

  10. EAC Recommendations for DOE Action on a Strategic Portable Generation Reserve - October 17, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richard Cowart, Chair DATE: October 17, 2012 RE: Recommendation on Strategic Portable Generation Reserve _________________________________________________________________________ The purpose of this memorandum is to convey to the U.S. Department of Energy (DOE) the Electricity Advisory Committee (EAC) recommendation that DOE not pursue a Strategic Portable Generation Reserve ("the Reserve") and to summarize the conclusions leading to this recommendation. DOE's establishment of the

  11. Notice of Emergency Action- Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC: Federal Register Notice Volume 71, No. 13- Jan. 20, 2006

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. Pursuant to 10 CFR 1021.343, the U.S. Department of Energy is issuing this Notice to document emergency actions that it has taken, and to set forth the steps it intends to take...

  12. Notice of Intent to Revise DOE O 457.1, Nuclear Counterterrorism

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-02-07

    Intent is to revise DOE O 457.1 and include the content of DOE M 457.1-1 as appendices to the revised order.

  13. DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act

    Broader source: Energy.gov [DOE]

    Today, in response to a formal request, General Counsel Scott Blake Harris approved a second and final extension of the public comment period to November 30, 2010 on DOE’s Notice of Inquiry (75 FR...

  14. DOE Publishes Supplemental Notice of Proposed Rulemaking for Alternative Efficiency Determination Methods and Alternative Rating Methods

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a supplemental notice of proposed rulemaking to revise and expand its existing regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air-condition

  15. DOE Extends Comment Period on Certification and Enforcement Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    In response to a formal request, the Department has extended to October 29, 2010, the deadline for submission of comments in response to the Notice or Proposed Rulemaking on the certification and...

  16. DOE/EV-0005/11 Formerly Utilized M.ED/AEC Sites Remedial Action...

    Office of Legacy Management (LM)

    A search of MED and AEC records indicated that for some of ... for remedial action in terms of external gamma radiation ... seep from the ground and enter structures through floors, ...

  17. DOE/EV-0005/16 Formerly Utilized MED/AEC Sites Remedial Action...

    Office of Legacy Management (LM)

    A search of MED and AEC records indicated that for some of ... for remedial action in terms of external gamma radiation ... inert gas which may leave the soil and enter the atmosphere. ...

  18. Notice of Intent to Develop DOE O 470.6, Integrating Existing Technical Security Program Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-21

    This memorandum provides justification for the development of one integrated and consolidated set of requirements for the Department of Energy (DOE) Technical Security Program (TSP). This Order will combine the existing necessary requirements from DOE Manual (M) 205.1-3, Telecommunications Security Manual, dated 4-17-2006 and DOE M 470.4-4A chg.1, Information Security Manual, dated 10-12-2010; Section D -Technical Surveillance Countermeasures, into a single DOE Order defining the DOE TSP.

  19. Notice of Intent to Develop a DOE Policy, Small Business First

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-11

    The Policy will require all programs to use small business entities to the maximum extent practicable for all contract actions

  20. DOE Takes Action to Stop the Sales of Air-Con Air Conditioner...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Follow Secretary Chu on his Facebook page. Media contact(s): (202) 586-4940 Addthis Related Articles DOE Requires Air-Con International to Cease Sales of Inefficient Air ...

  1. DOE/OR/20722-41 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    I'a contamination, at concentrations in excess of DOE-approved 3I limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected ...

  2. DOE/OR/20722-40 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    of DOE-approved limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected of being radioactively contaminated since they ...

  3. DOE/OR/20722-37 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    of DOE-approved limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected of being radioactively contaminated since they ...

  4. DOE/OR/20722-39 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    of DOE-approved limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected of being j ; *radioactively contaminated since ...

  5. DOE/OR/20722-34 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    of DOE-approved limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected of being radioactively contaminated since they ...

  6. DOE/OR/20722-42 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    of DOE-approved limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected of being 3l radioactively contaminated since ...

  7. DOE/OR/20722-38 Formerly Utilized Sites Remedial Action Program...

    Office of Legacy Management (LM)

    of DOE-approved limits, remains from the early years of the U.S. atomic energy program. The residential properties were suspected of being 5* radioactively contaminated since ...

  8. Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Action at Active Uranium and Thorium Processing Sites AGENCY: Department of Energy. ... FY 2012 from eligible active uranium and thorium processing site licensees for ...

  9. Notices

    Broader source: Energy.gov (indexed) [DOE]

    Availability of the Environmental Protection Agency's Update of Two Chapters in the EPA Air Pollution Control Cost Manual AGENCY: Environmental Protection Agency (EPA). ACTION:...

  10. Notices

    Broader source: Energy.gov (indexed) [DOE]

    ... to the existing Hartwell Compressor Station; construction of a new 15,900 hp ... The docket for this action, identified by docket identification (ID) number ...

  11. Notices

    Broader source: Energy.gov (indexed) [DOE]

    of the proposed action (i.e., granting the Presidential permit or amendment, with any conditions and limitations, or denying the permit) pursuant to the National Environmental...

  12. Notice of Intent to Issue DOE N 314.1, DOE-Flex: DOE's Telework Program while Developing a Successor Order (5-6-11)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-06

    This is to develop DOE N 3XX, which will establish the requirements and responsibilities for the Department's telework/flexiplace program.

  13. Notice of Intent to Revise DOE M 470.4-6

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-06

    The proposed revision of this manual will convert the requirements to and new order, DOE O 470.6, and cancel DOE M 470.4-6, Chg 1.

  14. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... DC 20585; by electronic mail to Brian.Mills@hq.doe.gov; or by facsimile to ... * South Hero Free Library-76 South Street, South Hero, Vermont * Fletcher Free ...

  15. Notices

    Energy Savers [EERE]

    ... well as discussions of distributed resource integration and lessons for grid resilience. ... Update on DOE Office of Electricity Delivery and Energy Reliability (OE) 2013 Current ...

  16. Notices

    Broader source: Energy.gov (indexed) [DOE]

    ... Please do not include any active hyperlinks or password protection in any of the electronic documents related to the filing. All electronic filings submitted to DOE must follow ...

  17. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised 11-2009 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the

  18. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that

  19. DOE Issues a Notice of Proposed Rulemaking and Announcement of Public

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Pertaining to Test Procedure for Walk-in Coolers and Walk-in Freezers | Department of Energy TP_NOPR_Notice (940.65 KB) More Documents & Publications 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking 2014-05-08 Issuance: Energy Conservation Standards for Walk-in Coolers and Freezers; Final Rule 11-04-2015 Issuance: Energy Conservation Standards for Walk-in

  20. Notice of Intent to Develop DOE G 410.2-1, Nuclear Materials Disposition Guidance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-10-01

    DOE O 410.2, Management of Nuclear Materials, identifies the Office of Nuclear Materials Integration (ONMI) asthe organization responsible for nuclear materials management policy, guidance, and integration of DOEagency-wide management, consolidation, and/or disposition of nuclear materials. Specifically,the Order directs ONMI to provide guidance to DOE field elements, as required, for Defined Use and No Defined Use nuclear materials. Further, the Order authorizes this office to review and evaluate justifications for nuclear materials designated as No Defined Use. DOE O 410.2 also requires ONMI to provide guidance to DOE field elements regarding nuclear material discard limits in coordination with relevant DOE headquarters organizations.

  1. NOTICE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ~ ~ . _ _ _ _ - NOTICE This report was prepared as a n account of work sponsored by the United States Government. Neither the United States nor the United States Energy Research and Development Administration, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed,

  2. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    32 Federal Register / Vol. 79, No. 158 / Friday, August 15, 2014 / Notices (202) 219-3032. The registration deadline is Tuesday, September 2, 2014. Individuals who will need accommodations for a disability in order to attend the hearing (i.e., interpreting services, assistive listening devices, and/or materials in alternative format) should notify the Advisory Committee no later than Tuesday, September 2, 2014 by contacting Ms. Tracy Jones at (202) 219-2099 or via email at

  3. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    07 Federal Register / Vol. 78, No. 93 / Tuesday, May 14, 2013 / Notices Air quality; soils, geology, and mineral resources; ground water; surface water; biological resources; cultural resources; land use; socioeconomics; environmental justice; community services; utility systems; transportation; materials and waste management; human health, safety, and accidents; and noise. Because the proposed project may affect wetlands, the draft EIS includes an assessment of impacts to wetlands in accordance

  4. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Federal Register / Vol. 79, No. 37 / Tuesday, February 25, 2014 / Notices 1 By issuing an ESP, NRC approves one or more sites for a nuclear power facility, independent of the specific nuclear plant design. In reviewing an ESP application, the NRC evaluates site safety issues, environmental protection issues, and plans for coping with emergencies. By issuing a COL, NRC authorizes the licensee to construct and operate (under specified conditions) an approved design for a nuclear power plant at a

  5. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    493 Federal Register / Vol. 79, No. 124 / Friday, June 27, 2014 / Notices DATES: Deadline for Transmittal of Applications: July 15, 2014. FOR FURTHER INFORMATION CONTACT: Christine Miller, U.S. Department of Education, 400 Maryland Avenue SW., Room 4C119, Washington, DC 20202- 5950. Telephone: (202) 453-5680 or by email: tqpartnership@ed.gov. If you use a telecommunications device for the deaf or a text telephone, call, toll free: 1-877-576-7734. SUPPLEMENTARY INFORMATION: All other information

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6793 Federal Register / Vol. 79, No. 154 / Monday, August 11, 2014 / Notices governmental organizations; interested Indian tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission's regulations) who are potential right-of-way grantors, whose property may be used temporarily for Project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the

  7. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    421 Federal Register / Vol. 79, No. 249 / Tuesday, December 30, 2014 / Notices 1 18 CFR 385.2001-2005 (2014). 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ''COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY'' or ''MOTION TO INTERVENE,'' as applicable; (2) state in the heading the name of the applicant and

  8. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    538 Federal Register / Vol. 80, No. 81 / Tuesday, April 28, 2015 / Notices dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docs- filing/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission's calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related

  9. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    795 Federal Register / Vol. 80, No. 123 / Friday, June 26, 2015 / Notices approved application and budget; and, if the Secretary has established performance measurement requirements, the performance targets in the grantee's approved application. In making a continuation grant, the Secretary also considers whether the grantee is operating in compliance with the assurances in its approved application, including those applicable to Federal civil rights laws that prohibit discrimination in programs

  10. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1800 Federal Register / Vol. 80, No. 165 / Wednesday, August 26, 2015 / Notices 1 Western's UGP Region has signed a membership agreement with SPP with a target date of transferring the functional control of its facilities in the eastern interconnection to SPP on October 1, 2015. Thereafter interconnection requests would be pursuant to the SPP tariff. Revisions to the SPP tariff incorporate Western's requirement that it will still perform NEPA reviews on interconnections associated with its

  11. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    268 Federal Register / Vol. 80, No. 167 / Friday, August 28, 2015 / Notices filed with the Board either before or after the meeting. Individuals who wish to make oral statements pertaining to agenda items should contact Greg Simonton at the address or telephone number listed above. Requests must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a

  12. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    848 Federal Register / Vol. 80, No. 33 / Thursday, February 19, 2015 / Notices collection of information are those materials necessary to allow the agency to determine applicant and community eligibility and an explanation and documentation of the high need for the benefits of the SUTA provisions. Program specific application materials, which funds are being applied for, are covered by the information collection package for the specific RUS program. Estimate of Burden: Public reporting burden

  13. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Federal Register / Vol. 80, No. 224 / Friday, November 20, 2015 / Notices To submit comments, or access the docket, please follow the detailed instructions provided under ADDRESSES in the Federal Register document of September 25, 2015. If you have questions on individual chemicals, consult the person listed in the Table. Authority: 7 U.S.C. 136 et seq. Dated: November 13, 2015. Michael Goodis, Acting Director, Pesticide Re-Evaluation Division, Office of Pesticide Programs. [FR Doc. 2015-29689

  14. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    37 Federal Register / Vol. 80, No. 243 / Friday, December 18, 2015 / Notices functions and duties of the Chief Financial Officer of the Department of Education. Date: December 11, 2015. Thomas P. Skelly, Delegated to perform the functions and duties of the Chief Financial Officer. [FR Doc. 2015-31900 Filed 12-17-15; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF EDUCATION [Docket No.: ED-2015-ICCD-0142] Agency Information Collection Activities; Comment Request; Federal Direct Consolidation Loan

  15. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42 Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices was to complete sales and distribution by March 2016, EPA anticipates that the registrant will not need an existing stocks provision. Persons other than the registrant will generally be allowed to sell, distribute, or use existing stocks until such stocks are exhausted, provided that such sale, distribution, or use is consistent with the terms of the previously approved labeling on, or that accompanied, the cancelled product.

  16. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61 Federal Register / Vol. 81, No. 107 / Friday, June 3, 2016 / Notices ingestion of formula mixed with contaminated drinking water or breast milk. EPA is considering deriving a perchlorate MCLG by linking BBDR model output to alterations in thyroid hormone status that result in alterations in neurodevelopment. The draft approach for deriving a perchlorate MCLG outlines an assessment of the literature linking alterations in thyroid hormone status to alterations in neurodevelopment. Based on the

  17. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    54 Federal Register / Vol. 81, No. 107 / Friday, June 3, 2016 / Notices Subcommittees will not work independently of the Board and must report all recommendations and advice solely to the Board for full deliberation and discussion. Subcommittees, task forces, or working groups have no authority to make decisions and recommendations, verbally or in writing, on behalf of the Board. No subcommittee or any of its members can update or report, verbally or in writing, directly to the DoD or any

  18. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    486 Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices development and implementation of programs related to onshore unconventional natural gas and other petroleum resources to the Secretary of Energy and provide comments and recommendations and priorities for the Department of Energy Annual Plan per requirements of the Energy Policy Act of 2005, Title IX, Subtitle J, Section 999. Tentative Agenda 10:30 a.m. Registration 11 a.m. Welcome and Roll Call; Opening Remarks by

  19. Notices

    Office of Environmental Management (EM)

    294 Federal Register / Vol. 78, No. 184 / Monday, September 23, 2013 / Notices days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling

  20. Notices

    Energy Savers [EERE]

    48132 Federal Register / Vol. 79, No. 158 / Friday, August 15, 2014 / Notices (202) 219-3032. The registration deadline is Tuesday, September 2, 2014. Individuals who will need accommodations for a disability in order to attend the hearing (i.e., interpreting services, assistive listening devices, and/or materials in alternative format) should notify the Advisory Committee no later than Tuesday, September 2, 2014 by contacting Ms. Tracy Jones at (202) 219-2099 or via email at

  1. Notices

    National Nuclear Security Administration (NNSA)

    80348 Federal Register / Vol. 80, No. 247 / Thursday, December 24, 2015 / Notices 1 Transuranic (TRU) waste is waste that contains alpha particle-emitting radionuclides with atomic numbers greater than that of uranium (92) and half- lives greater than 20 years in concentrations greater than 100 nanocuries per gram of waste. science, technology, and innovation may bear on the policy choices before the President. PCAST is co-chaired by Dr. John P. Holdren, Assistant to the President for Science

  2. Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    04 Federal Register / Vol. 78, No. 86 / Friday, May 3, 2013 / Notices consistent with its approved application and budget. In making a continuation grant, the Secretary also considers whether the grantee is operating in compliance with the assurances in its approved application, including those applicable to Federal civil rights laws that prohibit discrimination in programs or activities receiving Federal financial assistance from the Department (34 CFR 100.4, 104.5, 106.4, 108.8, and 110.23).

  3. Notices

    National Nuclear Security Administration (NNSA)

    7100 Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices CRA requirements. These requirements currently include transfer of data on lender interest benefits and special allowance payments, defaulted loan balances, and supplemental pre-claims assistance payments information. (13) Disclosure in the Course of Responding to Breach of Data. The Department may disclose records from this system to appropriate agencies, entities, and persons when: (a) The Department suspects or has

  4. DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – The Energy Department recently signed a notice of intent to prepare an environmental assessment to analyze the potential environmental impacts from a proposed project to accept used nuclear fuel from the Federal Republic of Germany at DOE’s Savannah River Site (SRS) for processing and disposition.

  5. DOE Announces Notice of Intent to Issue Funding for Inter-Tribal Providers Network

    Broader source: Energy.gov [DOE]

    On Dec. 8, 2015, the U.S. Department of Energy Office of Indian Energy Policy and Programs announced a notice of intent to issue a funding opportunity announcement in February 2016 for inter-tribal organizations to help provide tribal communities with the knowledge, skills, and resources needed to implement successful strategic energy solutions.

  6. Catching Lithium Ions in Action in a Battery Electrode | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) Catching Lithium Ions in Action in a Battery Electrode Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) Community Resources Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3081 F: (301) 903-6594 E: Email Us More Information » 10.01.12 Catching Lithium

  7. EIS-0337: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  8. DOE Hydrogen Transition Analysis Workshop Discussion Comments, Questions, and Action Items

    Broader source: Energy.gov (indexed) [DOE]

    Drivetrains | Department of Energy 2 edition of the Wind Program R&D Newsletter. Investing in next generation drivetrains can help lower the cost and improve the reliability of wind turbines, particularly in larger offshore applications. This includes both improving current drivetrain configurations, as well as creating innovative drivetrain designs. For these reasons, the U.S. Department of Energy (DOE) recently awarded Advanced Magnet Lab (AML) in Palm Bay, Florida, and the National

  9. Enforcement Action - EA-2003-05 - Consent Order Between US DOE and Flour Fernald

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18, 2003 Mr. Woodrow Jameson [ ] Fluor Fernald, Inc. P.O. Box 538704 Cincinnati, OH 45252-8704 EA-2003-05 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Fluor Fernald, Inc. Dear Mr. Jameson: This letter refers to the Department of Energy's (DOE) evaluation of a recent investigation conducted by Fluor Fernald, Inc. (Fluor Fernald) into the facts and circumstances surrounding an unposted High Radiation Area adjacent to the small concrete building [ ] currently

  10. EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the Chemistry and ...

  11. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Energy Savers [EERE]

    Impact Statement Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft...

  12. Notices

    Gasoline and Diesel Fuel Update (EIA)

    ... The proposed forms and changes in definitions and instructions are available on EIA's Web ... below and is also available electronically on EIA's Web site at http:www.eia.doe.gov. ...

  13. Notices

    Energy Savers [EERE]

    be made available for public inspection, including being posted on the PCAST Web site. ... ADDRESSES: This Final EIS is available on the DOE NEPA Web site at http: energy.govnepa ...

  14. Notices

    Energy Savers [EERE]

    Please do not include any active hyperlinks or password protection in any of the documents or attachments related to the filing. All electronic filings submitted to DOE must follow ...

  15. Notices

    National Nuclear Security Administration (NNSA)

    ... are available through the DOE NEPA Web site at: http:www.gc.energy.govNEPA. ... The business case analyses are available to the public on the project Web site: http: ...

  16. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    request for additional review time. DOE will give equal weight to written, email, and oral comments. Questions regarding the ULP PEIS process, requests to be placed on the ULP...

  17. Notices

    National Nuclear Security Administration (NNSA)

    ... Impact can be viewed on the DOE NEPA Web site (http:energy.govnepa downloads... at WIPP on the WIPP Web site (http:www.wipp.energy.gov wipprecoveryrecovery.html). ...

  18. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    107 Federal Register / Vol. 80, No. 52 / Wednesday, March 18, 2015 / Notices 1 With respect to a given amount of LEU, the ''natural uranium equivalent'' is the amount of natural uranium feed that would be required to produce that amount of LEU. The ratio of feed to product is a function of the assay of the feed and the desired assays of the enriched product and the depleted tails (''assay'' refers to the ratio of the fissile isotope U-235 to other isotopes of uranium such as U-234 and U-238).

  19. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    70 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices 1 The authority to regulate the imports and exports of natural gas, including liquefied natural gas, under section 3 of the NGA (15 U.S.C. 717b) has been delegated to the Assistant Secretary for FE in Redelegation Order No. 00-006.02 issued on November 17, 2014. 2 10 CFR part 590 (2012). 3 Federal Energy Regulatory Commission, Final Environmental Impact Statement for the Lake Charles Liquefaction Project, Docket Nos. CP14-

  20. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69 Federal Register / Vol. 79, No. 131 / Wednesday, July 9, 2014 / Notices Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF). To use PDF you must have Adobe Acrobat Reader, which is available

  1. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77 Federal Register / Vol. 79, No. 235 / Monday, December 8, 2014 / Notices 1 The Final EIS can be found on the RUS Web site at: http://www.rurdev.usda.gov/UWP-AVS- Neset.html. Process: Any proposed change to the Base component will require a public process. The Drought Adder may be adjusted annually using the above formulas for any costs attributed to drought of less than or equal to the equivalent of 2 mills/kWh to the Power Repayment Study (PRS) composite rate. Any planned incremental upward

  2. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2033 Federal Register / Vol. 79, No. 138 / Friday, July 18, 2014 / Notices location listed in the ADDRESSES section during the hours of 9:00 a.m. to 5:00 p.m., Eastern Time, Monday through Friday except for legal holidays. Before including your address, phone number, email address or other personally identifiable information in your comment, you should be aware that your entire comment-including your personally identifiable information- may be made publicly available at any time. While you can

  3. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    192 Federal Register / Vol. 80, No. 219 / Friday, November 13, 2015 / Notices 1 National Hydropower Asset Assessment Program, Non-Powered Dam Resource Assessment can be found at http://nhaap.ornl.gov/content/non- powered-dam-potential. 2 18 U.S.C. 4, 5, and 16. 3 Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408). 4 Section 404 of the Clean Water Act (33 U.S.C. 1344). Total Estimated Number of Annual Responses: 22,123. Total Estimated Number of Annual Burden Hours: 7,374. Abstract:

  4. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    431 Federal Register / Vol. 80, No. 223 / Thursday, November 19, 2015 / Notices 1 Order Accepting Settlement Agreement and Granting Exemption from Licensing (5MW or less), (48 FERC ¶ 61,188). Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2015-11-10 Filing to Maintain Default Loss Allocation Provisions Effectiveness to be effective 2/11/2016. Filed Date: 11/10/15. Accession Number: 20151110-5165. Comments Due: 5 p.m. ET 12/1/15. Docket

  5. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    257 Federal Register / Vol. 81, No. 24 / Friday, February 5, 2016 / Notices filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Coffeeville Lock and Dam Hydroelectric Project (Coffeeville Project or project) to be located at the U.S. Army Corps of Engineers' Coffeeville Lock and Dam on the Tombigbee River in Clark County, Alabama. The sole purpose of a preliminary permit, if issued, is to grant the

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    667 Federal Register / Vol. 76, No. 187 / Tuesday, September 27, 2011 / Notices agreement with an eligible lender trustee. Further, when an approved not- for-profit holder has a change in status, within 10 days of becoming aware of the occurrence of a change that may result in a State or non-profit entity that has been designated an eligible not-for- profit holder, either directly or through an eligible lender trustee, losing that eligibility, the State or non-profit entity must submit details

  7. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Federal Register / Vol. 80, No. 146 / Thursday, July 30, 2015 / Notices the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project. Additional Information Additional information about the project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ''General Search''

  8. Notices

    Office of Environmental Management (EM)

    9

    70 Federal Register / Vol. 81, No. 151 / Friday, August 5, 2016 / Notices 1 The authority to regulate the imports and exports of natural gas, including liquefied natural gas, under section 3 of the NGA (15 U.S.C. 717b) has been delegated to the Assistant Secretary for FE in Redelegation Order No. 00-006.02 issued on November 17, 2014. 2 10 CFR part 590 (2012). 3 Federal Energy Regulatory Commission, Final Environmental Impact Statement for the Lake Charles Liquefaction Project,

  9. Notices

    Energy Savers [EERE]

    3482 Federal Register / Vol. 81, No. 156 / Friday, August 12, 2016 / Notices to gather information on the potential for an Energy Savings Performance Contract Energy Sales Agreement (ESPC ESA) project to qualify as a service contract under 26 U.S.C. 7701(e) and thus remain eligible for the 26 U.S.C. 48 solar investment tax credit (ITC). The RFC requests commenters to identify any specific language included in 26 U.S.C. 7701(e)(4)(A)(i)-(iv) that could benefit from clarification in the form of

  10. Notices

    National Nuclear Security Administration (NNSA)

    4908 Federal Register / Vol. 77, No. 173 / Thursday, September 6, 2012 / Notices and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission's eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing

  11. U.S. NNSA/DOE - Nevada Site Office - Notice To Users

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NOTICE TO USERS This is a Federal computer system and is the property of the United States Government. It is for authorized use only. Users (authorized or unauthorized) have no explicit or implicit expectation of privacy. Any or all uses of this system and all files on this system may be intercepted, monitored, recorded, copied, audited, inspected, and disclosed to authorized site, Department of Energy, and law enforcement personnel, as well as authorized officials of other agencies, both

  12. MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT DOE/EIS-0486 MARCH 2016 3 1 INTRODUCTION The U.S. Department of Energy (DOE) National Environmental Policy Act (NEPA) Implementing Procedures (Title 10 Code of Federal Regulations [CFR] 1021.331) require completion of a mitigation action plan (MAP) following each Environmental Impact Statement (EIS) and its associated Record of Decision (ROD) to address mitigation commitments expressed in the ROD. The DOE Notice

  13. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin November 10, 2011 EIS-0440: DOE and EPA Notice of Availability of a...

  14. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O 580 .1 A Admin Chg 1 3 10-23 2012 U.S. Department of Energyadmin change DOE O XXX.XWashington, D.C. DOE O XXX.X Chg X: XX-XX-XXXX SUBJECT: ADMINISTRATIVE CHANGE TO DOE O XXX.X, TITLE (IN ITALICS) EXPLANATION OF CHANGES. [This information can be copied from the Approval Memo] LOCATIONS OF CHANGES: Page Paragraph Changed To [Original text that was changed] [Revised text]

  15. EA-1861: DOE Notice of Availability of the Finding of No Significant...

    Broader source: Energy.gov (indexed) [DOE]

    Frito Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) has issued a Finding of No Significant Impact (FONSI) based on completion of an...

  16. Notice of Intent to Develop a Page Change to DOE O 413.3B, Program...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a Page Change to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets by Diane Johnson The Page Change is a limited update to incorporate recent...

  17. Notice of Intent to Revise DOE O 452.2D, Nuclear Explosive Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-05

    NNSA is proposing revisions for the suite of directives in order to (1) revise requirements to improve NES processes and (2) align the directives with the requirements of DOE Order 251.1C, Departmental Directives Program.

  18. Notice of Intent to Revise DOE Order 470.3B, Graded Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations. 15 NOV 23 - DOE O 470.3B Graded Security Protection (GSP)...

  19. Microsoft Word - FR Notice - DOE CMS RFI 02-03-2016 FINAL

    Office of Environmental Management (EM)

    In order to update the 2010 and 2011 analyses, DOE is seeking information from stakeholders on rare earth elements and other materials used in an array of energy technologies, as ...

  20. Notice of Intent to Develop DOE G 413.3-22, Analysis of Alternatives Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-01-21

    The proposed guide provides a best practices approach for conducting and reviewing Analysis of Alternatives (AoA) for DOEcapital asset projects subject to DOE O 413.3B.

  1. Notice of Intent to Revise DOE G 413.3-17, Mission Need Statement

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-01-21

    The proposed revision focuses on updating terminology and references, and alignment with Secretarial memoranda on project management issued since the last update to DOE0 413.3B.

  2. Bond Renewal Final Notice, Extension of DOE N 470.5- September 28, 2011

    Broader source: Energy.gov [DOE]

    Effective immediately, DOE N 470.5, Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, dated 8-12-09 is extended until 9-28-11

  3. Notice of Intent to Revise DOE O 341.1, Federal Employee Health...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    compensation claim, and make minor updates, e.g., for organizational titles and internet links. 15 NOV 23 - DOE O 341.1 Federal Employee Health Services.pdf -- PDF Document,...

  4. DOE Announces Notice of Intent to Issue Funding for Tribal Clean Energy and Energy Efficiency Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs intends to issue a funding opportunity announcement (FOA) later this year that will help promote tribal energy...

  5. EIS-0463 and EIS-0463-S1: DOE Notice of Public Hearings | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy UPDATE: DOE has extended the public comment period for the Draft EIS and the Supplement to the Draft EIS to 4/4/2016. The public hearings that were planned for December 2015 have been cancelled. Please see the EIS website for more information: http://www.northernpasseis.us/images/uploads/documents/NP_DEIS_Public_No... DOE announces public hearings to receive comments on the Draft EIS and the Supplement to the Draft EIS. The Draft EIS and Supplement evaluate the potential environmental

  6. 60-DAY Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper

  7. Notice of Intent to Revise DOE O 200.1A, Information Technology Management--Withdrawn

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-12-15

    Withdrawn 3-24-14. Although DOE O 200.1A was revised in December 2008, there have been significant changes in IT governance processes and Departmental use of new technologies such as Web 2.0 technologies since that time.

  8. Notice of Intent to Develop DOE P XXX.X, Contractor Assurance Systems Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-06-09

    The Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) found that the implementation of contractor assurance system (CAS) is inconsistent and recommended that DOE ensure greater uniformity across the complex. CRENEL also recommended that site offices more extensively use data from CAS.

  9. Notice of Intent to Revise DOE G 413.3-5A, Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-02-03

    The proposed revision to this Department of Energy Guide focuses on updating the current guide with the latest terminology and references, regarding Performance Baseline Development process. This update also incorporates the latest Secretarial memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  10. Notice of Intent to Revise DOE Order 470.3B, Graded Security Protection (GSP) Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Request approval to revise the subject Order to make significant changes which are required for the Order to be consistent with threat information received from the intelligence community. Information provided by the joint DOE/IN and Defense Intelligence Agency, Nuclear Security Threat Capabilities Assessment, revealed the need to adjust adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations.

  11. EIS-0355: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    0-SA-02: Final Supplement Analysis EIS-0350-SA-02: Final Supplement Analysis Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico Supplement Analysis To meet mission requirements, the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) proposes to relocate analytical chemistry (AC) and materials characterization (MC) capabilities at Los Alamos National Laboratory (LANL) from the Chemistry and Metallurgy

  12. EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis |

    Energy Savers [EERE]

    0-SA-04: Supplement Analysis EIS-0200-SA-04: Supplement Analysis Proposal to Transport Low-Level Radioactive Waste Material Generated by the Consolidated Edison Uranium Solidification Project from the Oak Ridge National Laboratory to the Nevada National Security Site for Disposal This SA evaluates a DOE proposal to transport and dispose of ceramic-like monoliths containing radioisotopes of uranium from the Consolidated Edison Uranium Solidification Project at the Oak Ridge National Laboratory to

  13. Notice of Intent to Revise DOE Order 470.3B, Graded Security Protection (GSP) Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-23

    Request approval to revise the subject Order to make significant changes which are required for the Order to be consistent with threat information received from the intelligence community. Information provided by the joint DOE/IN and Defense Intelligence Agency, Nuclear Security Threat Capabilities Assessment, revealed the need to adjust adversary numbers and capabilities to reflect the intent of the policy and the inherent risk management considerations.

  14. Notice of Intent to Develop DOE Guide 436.1-1, Sustainable Print Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-19

    The Guide will support Executive Order (E.O.) 13693, Planning for Federal Sustainability in the Next Decade. signed on March 19, 2015, which requires the Federal Government to lead by example to create a clean energy economy that will increase prosperity, promote energy security, protect the interests of taxpayers, and safeguard the health of the environment. Under E.O. 13693, Federal agencies are required to increase energy efficiency, eliminate waste, and leverage agency acquisitions by reducing costs and resources in their printing activities. This Guide also aligns with the requirements of DOE O 436.1, Departmental Sustainability.

  15. EIS-0499: Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Intent to Prepare Environmental Impact Statement EIS-0499: Notice of Intent to Prepare Environmental Impact Statement Great Northern Transmission Line Project The Department of Energy announces its intent to prepare an environmental impact statement (EIS) (DOE/EIS-0499) to assess the potential environmental impacts from its proposed federal action of granting a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new electric

  16. DOE FACT SHEET: Transition to High Efficiency Space Heating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACT SHEET: Transition to High Efficiency Space Heating Overview The City of Seattle was recognized as a Climate Action Champion (CAC) by The White House and the Department of Energy (DOE) in December 2014. In 2015, DOE released a Notice of Technical Assistance (NOTA) to provide CACs with additional opportunities for financial and technical assistance to support and advance their greenhouse gas emissions reduction and climate resilience objectives. DOE's Office of Energy Efficiency and Renewable

  17. Corrective Action Investigation Plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfields, Nevada Test Site, Revision 0, DOE/NV--535 UPDATED WITH RECORD OF TECHNICAL CHANGE No.1

    SciTech Connect (OSTI)

    US DOE Nevada Operations Office

    1999-04-12

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  18. Notice of Intent to Revise DOE O 483.1, Cooperative Research and Development Agreements and DOE M 483.1-1, Cooperative Research and Development Agreements Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-02-21

    Justification memorandum approving revision of the outdated DOE O 483.1 to incorporate DOE M 483.1-1 into the revised order.

  19. DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for residential water heaters and certain commercial water heaters.

  20. DOE Publishes Notice of Public Meeting and Availability of the Framework Document for General Service Lamps Energy Conservation Standards

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a Federal Register notice of public meeting and availability of the framework document regarding energy conservation standards for general service lamps.

  1. DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued)

    Broader source: Energy.gov [DOE]

    The Office of General Counsel has issued Notices of Proposed Civil Penalty to Westinghouse Lighting Corporation and Mitsubishi Electric & Electronics USA, Inc. for failing to certify that...

  2. DOE/OR/20722-133 POST-REMEDIAL ACTION REPORT FOR THE NIAGARA FALLS STORAGE SITE

    Office of Legacy Management (LM)

    OR/20722-133 POST-REMEDIAL ACTION REPORT FOR THE NIAGARA FALLS STORAGE SITE VICINITY PROPERTIES - 1985 AND 1986 JANUARY 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 M. E. Kaye and A. M. Feldman Bechtel National, Inc. Oak Ridge, Tennessee Bechtel J o b No. 14501 TABLE OF CONTENTS Abbreviations 1.0 Introduction 2.0 Remedial Action Guidelines 3.0 Remedial Action 4.0 Post-Remedial Action Sampling 5.0 Post-Remedial Action Status

  3. Notices and Rules Related to Federal Energy Management | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Federal Energy Management Program (FEMP) issues notices and rules related to federal ... The following notices and rules were announced by DOE, FEMP, and BTO through the Federal ...

  4. Pre-Announcement Meeting Notice for Financial Assistance Funding Opportunity Announcement DE-PS36-07G097012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Billing Code 6450-01-P] U.S. DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Pre-Announcement Meeting Notice for Finanacial Assistance Funding Opportunity Announcement (FOA) Number DE-PS36-07GO97012 AGENCY: Office of Energy Efficiency and Renewable Energy, DOE ACTION: Notice of Pre-Announcement Meeting for Manufacturing Research and Development for Hydrogen and Fuel Cell Systems FOA SUMMARY: The Hydrogen, Fuel Cells and Infrastructure Technologies Program, under the DOE

  5. Notice: DOE Announces the Proposed Plan for Remdial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site.

    Office of Legacy Management (LM)

  6. Notice: DOE Announces the Proposed Plan for Remdial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site.

    Office of Legacy Management (LM)

  7. Notice of Intent to Revise DOE O 251.1C, Departmental Directives Program and Conforming Changes to DOE O 252.1, Technical Standards Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-05-01

    To incorporate the latest changes to Directives Program, thereby ensuring consistency throughout the Department when developing and processing DOE Directives.

  8. Notice of Investigation Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 23, 2015 Enforcement Notice of Intent to Investigate, Computer Sciences Corporation The DOE Office of Enforcement issued a Notice of Intent to Investigate to Computer ...

  9. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  10. Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  11. EA-1903: Notice of Extension | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension EA-1903: Notice of Extension Kansas State University Zond Wind Energy Project, Manhattan, Kansas Due to the government funding lapse and shutdown, DOE has extended the public review period for the Kansas State University Zond Wind Energy Project EA, Manhattan, Kansas. Public comments on the EA's analysis and results of the environmental impacts of implementing DOE's proposed action will be accepted until November 4, 2013. EA-1903-DEA-NoticeofReviewExtension-2013.pdf (36.74 KB) More

  12. Notices DEPARTMENT OF ENERGY Western Area Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    076 Federal Register / Vol. 81, No. 72 / Thursday, April 14, 2016 / Notices DEPARTMENT OF ENERGY Western Area Power Administration [DOE/EIS-0474] Southline Transmission Line Project Environmental Impact Statement AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) and the U.S. Bureau of Land Management (BLM), acting as joint lead agencies, issued the Proposed Southline Transmission Line Project (Project) Final

  13. 30-Day Federal Register Notice - Extension

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Extension [6450-01-P] DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy. ACTION: Submission for Office of Management and Budget (OMB) review; comment request SUMMARY: The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension of its {enter the Title of the

  14. 60-DAY Federal Register Notice - Extended

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension [6450-01-P] DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE), pursuant to the Paperwork Reduction Act of 1995), intends to extend for three years, an information collection request with the Office of Management and Budget (OMB). Comments are invited on: (a) whether the extended collection of information is necessary for the proper performance of the functions of

  15. DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

  16. DOE FACT SHEET: Net Zero Retrofit Analysis Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACT SHEET: Net Zero Retrofit Analysis Overview Sault Ste Marie Tribe of Chippewa Indians (SSM) was recognized as a Climate Action Champion (CAC) by The White House and the Department of Energy (DOE) in December 2014. In 2015, DOE released a Notice of Technical Assistance (NOTA) to provide CACs with additional opportunities for financial and technical assistance to support and advance their greenhouse gas emissions reduction and climate resilience objectives. SSM was an awardee of this Technical

  17. ACTION MEMO: Technical Position on the Use of National Consensus and Building Codes to Meet DOE Order 420. I B.

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached technical position on the Use of National Consensus and Building Codes to meet Department of Energy (DOE) Order 420.1b Facility Safety, clarifies the use of national consensus and...

  18. Notice of Intent to Revise DOE Order 442.1A, Department of Energy Employee Concerns Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-06-14

    Revisions to DOE O 442.1A will help to bring about greater consistency throughout the DOE complex in the approach to processing employee concerns, and to support safety conscious work environment efforts.

  19. EA-1880: Notice of Public Comment Period Extension | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Notice of Public Comment Period Extension EA-1880: Notice of Public Comment Period Extension Big Bend to Witten Transmission Line, South Dakota The USDA Rural Utilities Service extended the public comment period for the draft EA it issued on January 28, 2015 to March 30, 2015. For more information on this project, including actions that DOE's Western Area Power Administration proposes as part of this proposed Project, see the project webpage:

  20. EIS-0394: Advance Notice of Intent to Prepare an Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Advance Notice of Intent to Prepare an Environmental Impact Statement EIS-0394: Advance Notice of Intent to Prepare an Environmental Impact Statement Implementation of the FutureGen Project The U.S. Department of Energy (DOE) is announcing in advance its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 et seq.), for the proposed action of providing Federal funding (up

  1. EIS-0472: Notice of Intent to Prepare a Programmatic Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Notice of Intent to Prepare a Programmatic Environmental Impact Statement EIS-0472: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Uranium Leasing Program Programmatic Environmental Impact Statement The underlying purpose and need for agency action is that, in support of the Energy Policy Act of 2005 (Public Law 109-58), which emphasized the reestablishment of nuclear power (Sections 601 through 657), DOE needs to determine the

  2. Extension of DOE Directives on Security

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-06

    The Notice extends the following directives until 12/31/02. DOE N 205.1, DOE N 205.2, DOE 205.3, DOE N 471.3, and DOE 473.6.

  3. Draft DOE P 226

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extension of DOE N XXX.X (Title) Synopsis Summary Background: The Office of XXXXXXXXXXXX (XX) is requesting a 1-year extension to DOE N XXX.X, (Title), dated XX-XX-XX. The Notice ...

  4. EAC Recommendations for DOE Action on the Development of the Next Generation Grid Operating System - October 17, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy FROM: Electricity Advisory Committee (EAC) Richard Cowart, Chair DATE: October 17, 2012 RE: Recommendations on Development of the Next Generation Grid Operating System (Energy Management System). _________________________________________________________________________ The purpose of this memorandum is to respectfully recommend to the U.S. Department of Energy (DOE) a roadmap for the

  5. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31, 1996 EIS-0183: DOE Notice of Availability of the Record of Decision Short-Term Marketing and Operating Arrangements November 1, 1995 EIS-0183: DOE Notice of Availability...

  6. Report of the DOD-DOE Workshop on Converting Waste to Energy Using Fuel Cells: Workshop Summary and Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report discusses the results of a January 13, 2011, workshop that focused on utilizing biowaste as an energy feedstock and converting this feedstock into heat and/or power using fuel cells. DOD and DOE are collaborating under a Memorandum of Understanding (MOU) to pursue technology-driven solutions that reduce petroleum use, among other objectives. One of the solutions being explored under the MOU is leveraging waste as feedstock for fuel cell applications in fixed and deployed military operations.

  7. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  8. Notice of Intent to Cancel DOE O 3750.1, Work Force Discipline and Replace with DOE O 333.1, Employee Management Relations (Workforce Discipline)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-08-21

    The proposed new Order would cancel DOE O 3750.1, dated 3-23-1998, which is severely outdated and deficient in addressing Genetic Information Non-discrimination Act (GINA), addressing Reprisal (verify), protections and entitlements under the Whistle Blower Act, 2014 Hatch Act changes, Nepotism, Executive Memorandums regarding issues such as texting while driving and current workforce issues as well as Merit Systems Protection Board (MSPB) preferred standards.

  9. Proposed Agency Information Collection: Federal Register Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's request the Office of Management and ...

  10. Notice of Intent to Revise DOE O 460.2A, Departmental Materials Transportation and Packaging Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-18

    Establishes requirements and responsibilities for management of Department of Energy (DOE), including National Nuclear Security Administration, materials transportation and packaging and ensures the safe, secure, efficient packaging and transportation of materials, both hazardous and non-hazardous.

  11. Notice of Intent to Develop DOE G 415.1-1, Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06

    The proposed guide will support consistent and effective implementation of DOE O 415.1 and will assist IT Program and Project Managers in effectively managing and applying sound project management to IT projects subject to that order.

  12. Notice of Intent to Revise DOE O 452.1D, Nuclear Explosive and Weapon Surety Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-05

    NNSA is proposing revisions for the suite of directives in order to (1) revise requirements to improve NES processes and (2) align the directives with the requirements of DOE Order 251.1C, Departmental Directives Program.

  13. Notice of Intent to Revise DOE O 329.1, Excepted Service Authorities for EJ and EK Pay Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-08-21

    DOE O 329.1 establishes requirements and responsibilities for the employment and compensation of individuals when using the EJ and EK excepted service authorities that are unique to the Department of Energy.

  14. Notice of Intent to Revise DOE O 331.1C, Chg 3, Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The revision incorporates recommendations from the FY12 National Council on Federal Labor-Management Relation's "Goals-Engagement-Accountability-Results (GEAR)" report and program requirements currently contained in the DOE Supervisory/Non-Supervisory Employee Performance Management and Recognition Desk Reference (Desk Reference) such as the DOE Monetary Awards Scale, as well as program requirements that have been established via memoranda since the Order was revised in October 2010.

  15. Notice of Intent to Revise DOE O 331.1C Chg 3, Employee Performance Management and Recognition Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-20

    The revision incorporates recommendations from the FY12 National Council on Federal Labor-Management Relation's "Goals-Engagement-Accountability-Results (GEAR)" report and program requirements currently contained in the DOE Supervisory/Non-Supervisory Employee Performance Management and Recognition Desk Reference (Desk Reference) such as the DOE Monetary Awards Scale, as well as program requirements that have been established via memoranda since the Order was revised in October 2010.

  16. Extension of DOE N 206.3

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-03-22

    The Notice extends DOE N 206.3, Personal Identity Verification, dated 11-22-05, until March 22, 2007.

  17. EIS-0226: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    April 2010) More Documents & Publications EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: Notice of Changes to Public Hearings...

  18. Enforcement Notice of Intent to Investigate, URS Energy and Constructi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    URS Energy and Construction, Inc. Enforcement Notice of Intent to Investigate, URS Energy and Construction, Inc. December 2015 The DOE Office of Enforcement issued a Notice of ...

  19. EIS-0496: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare an Environmental Impact Statement EIS-0496: Notice of Intent to Prepare an Environmental Impact Statement DOE's Western Area Power Administration ...

  20. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare Environmental Impact Statement EIS-0503: Notice of Intent to Prepare Environmental Impact Statement New England Clean Power Link, Vermont DOE announces ...

  1. Guidance Regarding Actions That May Proceed During the NEPA Process...

    Office of Environmental Management (EM)

    Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide...

  2. Notice of Intent to Develop a Page Change for DOE O 420.1C, Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-06-21

    The Page Change will be strictly limited in scope to changes necessary to accomplish the following objectives: (1) to invoke revised DOE-STD- 1104-20xx, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Document, as a required method; (2) to invoke revised DOE-STD-3009-20xx, Preparation of Nonreactor Nuclear Facility Documented Safety Analysis, as a required method for new nuclear facilities as discussed below; and (3) to make miscellaneous administrative corrections and clarifications based on the one-year implementation review required by DOE O 251.1C, Departmental Directives Program. This JM is an update to one approved June 21, 2013.

  3. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  4. Notices DEPARTMENT OF ENERGY [FE Docket No. 10-161-LNG; FE Docket No.

    Broader source: Energy.gov (indexed) [DOE]

    076 Federal Register / Vol. 81, No. 72 / Thursday, April 14, 2016 / Notices DEPARTMENT OF ENERGY Western Area Power Administration [DOE/EIS-0474] Southline Transmission Line Project Environmental Impact Statement AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) and the U.S. Bureau of Land Management (BLM), acting as joint lead agencies, issued the Proposed Southline Transmission Line Project (Project) Final

  5. Notice of Intent to Revise Department of Energy (DOE) Guide 413.3-15, Project Execution Plans.

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  6. Notice of Intent to Revise Department of Energy (DOE) Guide 413.3-15, Project Execution Plans.

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-10-01

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  7. Notices DEPARTMENT OF DEFENSE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surplus Land at a Military Installation Designated for Disposal: Ernest Veuve Hall USARC AMSA 75, T-25, Fort Missoula, Montana AGENCY: Department of the Army, DoD. ACTION: Notice. ...

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs were selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.

  9. DOE FACT SHEET: Net Zero Performance Analysis and Passive Survivability at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACT SHEET: Net Zero Performance Analysis and Passive Survivability at Seattle's New North Precinct Police Station Overview The City of Seattle was recognized as a Climate Action Champion (CAC) by The White House and the Department of Energy (DOE) in December 2014. In 2015, DOE released a Notice of Technical Assistance (NOTA) to provide CACs with additional opportunities for financial and technical assistance to support and advance their greenhouse gas emissions reduction and climate resilience

  10. DOE Fact Sheet: Cost-Effectiveness of Deep Green Alterations of Multi-family Buildings in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fact Sheet: Cost-Effectiveness of Deep Green Alterations of Multi-family Buildings in Seattle Overview The City of Seattle was a multiple awardee of the Climate Action Champions (CAC) Notice of Technical Assistance (NOTA). The U.S. Department of Energy (DOE)'s Office of Energy Efficiency and Renewable Energy offered technical assistance from its Commercial Building Partnerships (CBP) Program to provide CACs with additional opportunities for technical assistance to support and advance their

  11. Notice of Intent to Revise DOE Order 221.2A, "Cooperation with the Office of Inspector General"

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-04-08

    It is necessary to update the current version of this directive due to lack of consistent application and understanding of its provisions. DOE employees, program officials and managers, as well as employees of major facilities contractors, have indicated to OIG personnel that the directive, as currently written, is not sufficiently clear with respect to the nature and extent of cooperation with the OIG that is required.

  12. DOE Form

    National Nuclear Security Administration (NNSA)

    /1991) PROJECT: U.S. Department of Energy Requirements Change Notice Baseline List of Required Compliance Documents CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO.: DE-AC05-000R22800, I.85 , Laws, Regulations, and DOE Directives (December 2000), DEAR 970.5204-2 No.: NNSA-50 Page 1 of 36 Pages LOCATION: Oak Ridge, Tennessee DATE OF CONTRACT: August 31 , 2000 This Requirements Change Notice (RCN) No. NNSA-50 incorporates, into Section J, Attachment E, Contract No.

  13. DOE Form

    National Nuclear Security Administration (NNSA)

    11991) PROJECT: U.S. Department of Energy Requirements Change Notice Baseline List of Required Compliance Documents CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO. : DE-AC05-000R22800, 1.85, Laws, Regulations, and DOE Directives (December 2 000), DEAR 970.5204-2 COR-NP0-60 ESH-6.6.2013-515290 No.: NNSA-51 Page 1 of 34 Pages LOCATION : Oak Ridge, Tennessee DATE OF CONTRACT: August 31, 2000 This Requirements Change Notice (RCN) No. NNSA-51 incorporates, into Section J,

  14. Extension of DOE N 441.1, Radiological Protection for DOE Activities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-11-20

    This Notice extends DOE N 441.1, Radiological Protection for DOE Activities, dated 9-30-95 until 6-30-00.

  15. DOE Successfully Resolves Three Enforcement Cases and Files Yet Another |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Successfully Resolves Three Enforcement Cases and Files Yet Another DOE Successfully Resolves Three Enforcement Cases and Files Yet Another September 29, 2010 - 5:24pm Addthis The Department has resolved three more of the 27 certification enforcement cases initiated three weeks ago and issued one additional penalty notice to Nordyne, LLC for failure to certify certain air conditioner and heat pump products. These actions reflect the Department's continued aggressive

  16. DOE/EM-51

    Office of Environmental Management (EM)

    | Department of Energy DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission Line Project, New Hampshire EPA announces that DOE has extended the public comment period for the Draft Environmental Impact Statement for the Northern Pass Transmission Line Project (DOE/EIS-0463) to April 4, 2016. Comments submitted to DOE concerning the Northern Pass Draft EIS prior to this

  17. Notice of Intent to Revise DOE O 452.3, Management of the Department of Energy Nuclear Weapons Complex

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-01-11

    The Order is being revised to better align the roles and responsibilities of the Deputy Administrator for Defense Programs consistent with the National Nuclear Security Administration (NNSA) Act (Public Law 106-65, SEC 3214.50 U.S.C. 2404) and the 1953 Agreement between the Department of Energy (DOE) and Department of Defense (DoD) for the development, production, and standardization of nuclear weapons. NNSA is also seeking to align the nuclear weapons acquisition and life cycle management roles and responsibilities, to include streamlined defense programs business and execution requirements and processes, and change the name within the title from 'Nuclear Weapons Complex' to 'Nuclear Security Enterprise'.

  18. Extension of DOE Directives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-02-24

    This Notice extends the following directives until 2/16/04: DOE N 205.2, Foreign National Access to DOE Cyber Systems, and DOE N 205.3, Password Generation, Protection, and Use, dated 11/23/99-7/1/00.

  19. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Employee Concerns Program Jun 17, 2016 Notice of Intent to Develop DOE P XXX.X, Contractor Assurance Systems Policy May 20, 2016 New - DOE N 251.115, Cancellation of ...

  20. DRAFT Hanford Advisory Board Handout for PIC MTG 2/6/13 DOE NEPA vs. CERCLA Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board Handout for PIC MTG 2/6/13 DOE NEPA vs. CERCLA Process NEPA Notice of Intent (NOI) to prepare an EIS Published in Federal Register Scoping and Public Involvement Draft EIS Public Comment Period Final EIS Issued (with responses to public comments) NEPA ROD(s) Issued NEPA Mitigation Action Plan (USDOE) NEPA allows for judicial review before agency action under the Administrative Procedure Act (APA). RCRA Permitting Process with Opportunity for Public Comment for those units

  1. EA-1566: Notice of Comment Period Extension | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    EA-1566: DOE Notice of Availability of the Draft Environmental Assessment EIS-0250-S1 and EIS-0250-S2: DOE Notice of Availability of the Draft Supplemental Environmental...

  2. SEP PROGRAM NOTICE 10-006A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROGRAM NOTICE 10-006A SEP PROGRAM NOTICE 10-006A DOE RECOVERY ACT REPORTING REQUIREMENTS FOR THE STATE ENERGY PROGRAM (SEP) sep_10-006a_arra_reporting_guidance.pdf (230.76 KB) More Documents & Publications SEP Program Notice 10-006B SEP Program Notice 10-006C EECBG Program Notice 10-07C

  3. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2005 EA-1551: Notice of Intent to Prepare an Environmental Assessment EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line March 4, 2005 EIS-0342: DOE Notice of...

  4. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line January 11, 2008 EIS-0236-S4: DOE Notice of...

  5. DOE Comments - Radiation Protection (Atomic Energy Act) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy - Radiation Protection (Atomic Energy Act) DOE Comments - Radiation Protection (Atomic Energy Act) 1. United States Department of Energy Comments on "Application of Protective Action Guides (PAGs) for Radiological Dispersal Devices (RDD) and Improvised Nuclear Device (IND) Incidents"; Notice (71 FR 174; January 3, 2006) (138.29 KB) 2. Department of Energy Comments on NCRP SC 64-23 Draft Report (241.23 KB) 3. DOE Comments on: "Uniform Federal Policy for Quality Assurance

  6. RCRA corrective action and closure

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators` interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE`s permitted facilities and interim status facilities.

  7. Enforcement Notice of Intent to Investigate, Los Alamos National...

    Broader source: Energy.gov (indexed) [DOE]

    The DOE Office of Enforcement issued a Notice of Intent to investigate potential nuclear safety noncompliances at DOE's Los Alamos National Laboratory. The U.S. Department of...

  8. Enforcement Notice of Intent to Investigate, Los Alamos National Security, LLC

    Broader source: Energy.gov [DOE]

    The DOE Office of Enforcement issued a Notice of Intent to investigate potential nuclear safety noncompliances at DOEs Los Alamos National Laboratory.

  9. Cancellation of DOE HQ O 442.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-10-12

    The notice cancels DOE HQ O 442.1, Headquarters Occupational Safety and Health Program, dated 11-3-01.

  10. Interim Action Determination

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national security needs of the United States. Although the Deputy Secretary of Energy approved Critical

  11. DOE Office of Enforcement Continues Aggressive Energy Efficiency...

    Office of Environmental Management (EM)

    DOE Office of Enforcement Continues Aggressive Energy Efficiency Enforcement Effort with 20 New Proposed Penalty Notices DOE Successfully Resolves Three Enforcement Cases and Files ...

  12. DOE Publishes Final Rule for Television Test Procedure | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  13. DOE-HDBK-1131-2007 | Department of Energy

    Energy Savers [EERE]

    General Employee Radiological Training, Change Notice 1 (June 2009) | Replaced by DOE-HDBK-1131-2007 (Reaffirmed 2013) This handbook describes the DOE General Employee Radiological ...

  14. DOE-HDBK-1131-98 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 26, 2004 DOE-HDBK-1131-98: General Employee Radiological Training Change Notice No. ... This handbook describes the DOE General Employee Radiological Training program. It ...

  15. ex parte communication between the US DOE, ITI and select ITI...

    Energy Savers [EERE]

    of Energy (DOE) to discuss DOE's Notice of Data Availability (NODA) for battery chargers. ... Conservation Program: Test Procedure for Battery Chargers, Final Rule ITI DOE Ex Parte

  16. DOE-STD-7501-99 | Department of Energy

    Energy Savers [EERE]

    DOE-STD-7501-99 DOE-STD-7501-99 January 20, 2000 The DOE Corporate Lessons Learned Programs Superseding DOE-STD-7501-95 Including Change Notice No. 1 (September 1997) This...

  17. WEATHERIZATION PROGRAM NOTICE 09-1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Weatherization Assistance Program Grantees and Subgrantees dated January 27, 1984. DOE appreciates your attention to these notices and asks the network to provide ...

  18. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Chinook Project May 15, 2003 EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement...

  19. Notices of Availability (NOA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico July 6, 2006 EA-1566: DOE Notice of Availability of the Draft Environmental...

  20. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  1. Notice of Intent to Revise DOE G 423.1-1A, Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-05

    The purpose of this revision is to incorporate lessons learned as identified by DOE program offices.

  2. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect (OSTI)

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  3. Notice of Intent to Revise DOE G 414.1-1B, Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18

    This memorandum provides justification for revising DOE G 414.1-1B, Management and Independent Assessments Guide for Use With 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A, Implementation of Department of Energy Oversight Policy.

  4. Notice of Availability for Explanation of Significant Differences for the Rocky Flats Corrective Action Decision/Record of Decision Central Operable Unit

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of an Explanation of Significant Differences (ESD) for review. The ESD describes change in the location of the treatment of the Mound...

  5. EA-1926: Notice of Cancellation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1926: Notice of Cancellation EA-1926: Notice of Cancellation Energy Efficiency Design Standards for New Federal Low-Rise Residential Buildings (RIN# 1904-AC61) This notice is to announce that DOE has cancelled DOE/EA 1926, and is replacing it with DOE/EA 2020. EA-1926-NoticeofCancellation-2015.pdf (35.2 KB) More Documents & Publications EA-1926: Draft Environmental Assessment EA-2020: Notice of Availability of Draft Environmental Assessment EA-1871

  6. Status Update on Action 2b: Revision of DOE G 226.1-2 with new Guidance for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Strengthen guidance and formality associated with contractor implementation and Federal monitoring of activity-level WP&C. Develop a DOE Guide on Federal oversight and evaluation of the effectiveness of Activity-Level WP&C.

  7. Extension of DOE N 1240.2

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1994-11-29

    This Notice extends DOE N 1240.2, Unclassified Foreign National Visits and Assignments, of 11-29- 93, until 5-29-95.

  8. Change to DOE O 1230.2

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-10-20

    The attachment to this Notice cancels the attachment to DOE O 1230.2, American Indian Tribal Government Policy, dated 4-8-92.

  9. Radiological Control - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    98-2008, Change Notice 1, Radiological Control by Diane Johnson The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities...

  10. DOE Initiates Enforcement Proceedings against Westinghouse and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Civil Penalty Issued) DOE Initiates Enforcement Proceedings against Westinghouse and Mitsubishi for Failure to Certify (Notice of Proposed Civil Penalty Issued) ...

  11. What does the 2C Target Imply for a Global Climate Agreement in 2020? The LIMITS Study on Durban Action Platform Scenarios

    SciTech Connect (OSTI)

    Kriegler, Elmar; Tavoni, Massimo; Aboumahboub, Tino; Luderer, Gunnar; Calvin, Katherine V.; DeMaere, Gauthier; Krey, Volker; Riahi, Keywan; Rosler, Hilke; Schaeffer, Michiel; Van Vuuren, Detlef

    2013-11-01

    This paper provides a novel and comprehensive model?based assessment of possible outcomes of the Durban Platform negotiations with a focus on emissions reduction requirements, the consistency with the 2C target and global economic impacts. The Durban Action scenarios investigated in the LIMITS studyall assuming the implementation of comprehensive global emission reductions after 2020, but assuming different 2020 emission reduction levels and different long?term stabilization targetsshow that the probability of exceeding the 2C limit increases with stabilization target from below one third for 450?470 ppm to 40?60% for 490?510 ppm in 2100. Global time?averaged economic costs of the Durban Action scenarios are limited across models, and are largely unaffected by the stringency of 2020 pledges. By contrast, the economic impact of delaying action beyond 2030 is much stronger on transitional costs. The main significance of short term action in the period 2010?2030 lies in preparing the ground for steep emissions reductions thereafter by inducing global emissions to peak and decline. The institutional challenges of all scenarios with fragmented near?term climate policy can be expected to be high as reflected in a steep rise of carbon prices and decarbonization rates until 2040. We conclude that an agreement on comprehensive emissions reductions to be implemented from 2020 onwards has particular significance for meeting long term climate policy objectives.

  12. DOE-HDBK-3010-94; DOE Handbook Airborne Release Fractions/Rates...

    Broader source: Energy.gov (indexed) [DOE]

    10-94 December 1994 CHANGE NOTICE NO. 1 March 2000 DOE HANDBOOK AIRBORNE RELEASE FRACTIONSRATES AND RESPIRABLE FRACTIONS FOR NONREACTOR NUCLEAR FACILITIES Volume I - Analysis of ...

  13. Notice of Intent to Revise DOE G 414.1-4, Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-07-17

    The revision to DOE G 414.1-4 will conform to the revised DOE O 414.1D and incorporate new information and lessons learned since 2005, including information gained as a result of the February 2011, Government Accountability Office (GAO) report, GAO-11-143.

  14. Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-20

    The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

  15. Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

  16. EIS-0394: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    Notice of Intent to Prepare an Environmental Impact Statement EIS-0394: Notice of Intent to Prepare ... and the DOE NEPA implementing procedures (10 CFR part 1021), to assess the ...

  17. EIS-0286: Notice of Revised Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Revised Scope EIS-0286: Notice of Revised Scope Hanford Site Solid (Radioactive and Hazardous) Waste Program The U.S. Department of Energy (DOE) has decided to revise the...

  18. EIS-0226: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    6-R-NOI-2003.pdf More Documents & Publications EIS-0226: Notice of Intent to Prepare an Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Final...

  19. Notice of Intent to Develop DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium IT Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-21

    The proposed DOE G 415.1-2 will support consistent and effective implementation of DOE O 415.1 and will assist IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size.

  20. DOE Technical Standards Archived Collection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replaced by DOE-HDBK-11391-2006 | CHANGE NOTICE NO. 1 (September 2004) Why a DOE Chemical Management Handbook? Chemicals are ubiquitous in DOE's nuclear and non-nuclear...

  1. Modification of the U.S. Department of Energy`s (DOE) sytem of radiation protection requirements and guidance

    SciTech Connect (OSTI)

    O`Connell, P.V.; Rabovsky, J.L.; Zobel, S.G.

    1996-06-01

    DOE has undertaken a major modification of its system of radiation protection guidance and requirements. The objectives of this modification are to (1) eliminate unnecessary and redundant requirements, (2) clearly delineate requirements from guidance, (3) codify all radiation protection requirements, and (4) move from a compliance based approach towards a performance based approach. To achieve these objectives DOE has (1) canceled DOE Order 5480.11, {open_quotes}Radiation Protection for DOE Workers,{close_quotes} DOE Order 5480.15, {open_quotes}Department of Energy Laboratory Accreditation Program (DOELAP) for Personnel Dosimetry,{close_quotes} and DOE Notice 5400.13, {open_quotes}Sealed Radioactive Source Accountability,{close_quotes} (2) converted the DOE Radiological Control (RadCon) Manual from mandatory to non mandatory status, and (3) issued DOE Notice 441.1 to maintain those requirements (not in 10 CFR 835) considered necessary for radiation protection of workers. DOE has initiated actions to (1) amend 10 CFR 835 (the Federal rule on occupational radiation protection in the DOE complex) to incorporate the requirements, or their equivalent, in DOE Notice 441.1, (2) issue a technical standard containing guidance on DOELAP, (3) reissue the DOE RadCon Manual as a non mandatory technical standard that reflects the amendments to 10 CFR 835, and (4) revise the implementation guides on radiation protection for consistency with 10 CFR 835 and the RadCon Manual. As a result of these modifications, the system of radiation protection in the DOE will become more comparable with the system of radiation protection used by commercial industry and with the system of protection applied to other areas of worker health and safety.

  2. DOE Issues Draft Request for Proposals for Hanford Site Occupational

    Office of Environmental Management (EM)

    Certify Air Conditioners and Heat Pumps | Department of Energy Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps DOE Institutes Enforcement Action Against AeroSys, Inc. for Failure to Certify Air Conditioners and Heat Pumps February 4, 2010 - 1:58pm Addthis Washington, DC - The Department of Energy's Office of General Counsel has issued a Notice of Proposed Civil Penalty to AeroSys, Inc. for failing to file certification reports or filing data that was not derived

  3. EA-1949: Notice of Cancellation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    49: Notice of Cancellation EA-1949: Notice of Cancellation Admiralty Inlet Pilot Tidal Project, Puget Sound, Washington This notice is to announce that DOE is cancelling the NEPA process for the Snohomish County Public Utility District's Admiralty Inlet Pilot Tidal Project. EA-1949-NoticeofCancellation-2015.pdf (15.07 KB) More Documents & Publications EA-1949: FERC Notice of Availability Errata Sheet EA-1949: FERC Notice of Availability of an Environmental Assessment EA-1949: FERC

  4. Final Notice of Violation to UChicago Argonne, LLC- WEA-2009-04

    Broader source: Energy.gov [DOE]

    DOE is issuing this Final Notice of Violation (FNOV) to UChicago Argonne, LLC (UChicago Argonne) for violations of DOE's worker safety and health requirements.

  5. DOE F 284

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE-284 (10-88) MANDATORY DATA COLLECTION AUTHORIZED BY Public Laws 83-703, 93-438 Previous editions are obsolete. OMB CONTROL NO. 1910-1800 Public Reporting Notice Disclosure on Back NUCLEAR MATERIAL TRANSFER REPORT NUCLEAR MATERIAL ON TRANSFER SHIPPING DATE MATERIAL HAS BEEN VERIFIED AS FOLLOWS (CHECH ONE): DATE RECEIVED FROM (RIS) PIECE COUNT OTHER: SHIPPER'S WEIGHTS AND NUCLEAR MATERIAL CONTENTS ARE ACCEPTED PENDING FINAL VERIFICATION MEASUREMENTS AND COMPLETION OF DOE/NRC FORM 741 CONTAINER

  6. DOE Reg. Burden RFI

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 4, 2012 Page 1 January 4, 2012 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Regulatory Burden RFI Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the December 5, 2011 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its regulatory

  7. DOE F 4200.40A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A DOE F 4200.40A Form used to report on financial assistance actions for individual procurements. INDIVIDUAL PROCUREMENT ACTION REPORT (IPAR) (Financial Assistance Actions) (20.1 KB) More Documents & Publications DOE F 4200.40

  8. DOE-STD-7501-99

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Corporate Lessons Learned Programs Superseding DOE-STD-7501-95 Including Change Notice No. 1 (September 1997) This technical standard provides management expectations and a framework for the DOE Corporate Lessons Learned Program. The framework is intended to support development and implementation of a DOE-wide lessons learned infrastructure

  9. Notice of Intent to Revise Department of Energy Order 426.2 Change 1, Personnel Selection, Training, Qualification and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Office of Nuclear Safety consulted field and Headquarters (HQ) offices on whether or not a revision is warranted for DOE O 426.2. As a result, certain aspects of DOE O 426.2 were identified as needing clarification and revision. Based on this feedback, the revision is intended to clarify educational requirements, certification requirements, and applicability. Addressing these concerns should improve operating training programs, and result in less time focused on managing ambiguous or possibly unnecessary requirements.

  10. Notice of Intent to Revise Department of Energy Order 426.2 Change 1, Personnel Selection, Training, Qualification and Certification Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-02-19

    The Office of Nuclear Safety consulted field and Headquarters (HQ) offices on whether or not a revision is warranted for DOE O 426.2. As a result, certain aspects of DOE O 426.2 were identified as needing clarification and revision. Based on this feedback, the revision is intended to clarify educational requirements, certification requirements, and applicability. Addressing these concerns should improve operating training programs, and result in less time focused on managing ambiguous or possibly unnecessary requirements.

  11. Climate Action Champion: Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energy.gov/betterbuildings Climate Action Champion: Technical Assistance to the City of Seattle Planning for Seattle's new Building Energy Code Overview The City of Seattle, identified as a Climate Action Champion (CAC) by the Department of Energy (DOE), is revising its 2012 Energy Code, already one of the most progressive in the country. Seattle has made a pledge to be carbon neutral by 2050. Seattle received technical assistance from the Pacific Northwest National Laboratory in order to

  12. DOE Electricity Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    ... Activities can span from basic R&D through demonstration projects. Parallel Breakout Sessions (see white paper: "DOE Action Plan Addressing the Electricity Transmission System") ...

  13. Enforcement actions: Significant actions resolved individuals actions. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July - December 1996) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to-these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  14. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997

    SciTech Connect (OSTI)

    1997-09-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  15. DOE F 3305.6 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 DOE F 3305.6 Form documents actions of the Executive Personnel Board. EXECUTIVE PERSONNEL BOARD ACTION (4.31 KB) More Documents & Publications DOE F 3305.2 DOE F 3305.13

  16. DOE F 3420.2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE F 3420.2 Form used to identify a course, the actions and individual plans to take within 2 - 4 months. Action Plan (3.89 KB) More Documents & Publications DOE F 3305.11 DOE F ...

  17. EA-1706: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE...

  18. EO 12114: Environmental Effects Abroad of Major Federal Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline (DOE, 1981) Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities ...

  19. Corrective Action Tracking System User's Guide | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes...

  20. EA-1917: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Mitigation Action Plan EA-1917: Mitigation Action Plan Wave Energy Test Facility Project, Newport, OR Through the environmental review process, DOE determined, via consultations ...

  1. Limited-Notice Performance Test Inspectors Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Limited-Notice Performance Test Inspectors Guide Limited-Notice Performance Test Inspectors Guide October 2014 This document describes the Limited-Notice Performance Testing Program employed by DOE's Office of Enterprise Assessments to evaluate DOE safeguards and security programs. This document is one in a series of Inspectors Guides used by the Office of Security Assessments, within DOE's Office of Enterprise Assessments (EA), to conduct Independent Oversight appraisals of safeguards and

  2. 10 CFR 850, Notice of Proposed Rulemaking | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0, Notice of Proposed Rulemaking 10 CFR 850, Notice of Proposed Rulemaking The Department of Energy (DOE or the Department) is proposing to amend its current chronic beryllium disease prevention program regulation. The proposed amendments would improve and strengthen the current provisions and continue to be applicable to DOE Federal and contractor employees who are, were, or potentially were exposed to beryllium at DOE sites. 10 CFR 850, Notice of Proposed Rulemaking (1.52 MB) More Documents

  3. Acronyms - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acronyms by Website Administrator CRD - Contractor Requirements Document DNFSB - Defense Nuclear Facilities Safety Board DMTeam - Directives Management Team (MA-90) DOE P - Department of Energy Policy DOE N - Department of Energy Notice DOE O - Department of Energy Order DOE M - Department of Energy Manual DOE G - Department of Energy Guide DPC - Directives Point of Contact DRB - Directives Review Board established by DOE O 251.1C OPI - Office of Primary Interest (the writing organization)

  4. Notes and Action Items

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notes and Action Items Notes and Action Items ERSUG Action Items from June 1996 meeting at Germantown, MD Get DOE staff on mailers for broadcast of ERSUG issues Responsibility: Kendall and Kitchens Review and comment on ERSUG Proposal to SAC Responsibility: All of ERSUG Comments to Rick Kendall by July 17th email: ra_kendall@pnl.gov Fax : (509) 375-6631 Review and comment on Requirements Document "Greenbook" Responsibility: All of ERSUG Comments to Rick Kendall by August 7th email:

  5. Recently Approved Justification Memoranda - DOE Directives, Delegations,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Requirements Recently Approved Justification Memoranda by Website Administrator The following JMs were recently approved. JM DOE O 551.1D, Notice of Intent to Develop a Page Change to DOE O 551.1D, Official Foreign Travel JM DOE O 329.2, Request to Make a Page Change to DOE O 329.2, Excepted Service Authority for Exceptionally Well Qualified (EWQ) EQ Pay Plan Employees JM DOE G 415.1-2, Notice of Intent to Develop DOE G 415.1-2, Information Technology Project Execution Model Guide for

  6. NOTICE OF CANCELLATION

    Office of Environmental Management (EM)

    AVAILABILITY The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze and describe the potential environmental impacts associated with the proposed action associated with the following rulemaking: Final Rule, 10 CFR Part 435, "Energy Efficiency Standards for New Federal Low-Rise Residential Buildings' Baseline Standards Update" (RIN 1904-AD56) (DOE/EA-2020) DOE's Golden Field Office has prepared the draft EA in accordance with the National

  7. EIS-0451: Notice of Availability of Record of Decision | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Power Administration issued a notice of availability of its Record of Decision (ROD) for the Hooper...

  8. EA-1917: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for the...

  9. EIS-0483: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    Statement EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO DOE's...

  10. EA-1903: Notice of Scoping of an Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Scoping of an Environmental Assessment Kansas State University (KSU) Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office is requesting public ...

  11. EIS-0483: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO DOE's Western Area Power ...

  12. EA-1903: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the ...

  13. EA-1809: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces the...

  14. EIS-0463: Notice of Public Hearings | Department of Energy

    Energy Savers [EERE]

    Hearings EIS-0463: Notice of Public Hearings Northern Pass Transmission Line Project, New Hampshire DOE announces public hearings to receive comments on the Draft EIS. The Draft ...

  15. EIS-0463: Notice of Public Meeting Location Change | Department...

    Office of Environmental Management (EM)

    EIS-0463: Notice of Public Meeting Location Change Presidential Permit Application for Northern Pass Transmission, New Hampshire On September 6, 2013, DOE published in the Federal ...

  16. EIS-0500: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0500: Notice of Intent to Prepare Environmental Impact Statement Crystal Springs Hatchery Program; Bingham, Custer, and Lemhi Counties, Idaho DOE's Bonneville Power ...

  17. EIS-0383: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0383: Notice of Intent to Prepare an Environmental Impact Statement Orlando Gasification Project, Orlando, FL The U.S. Department of Energy (DOE) announces its...

  18. Part 3: Removal Action | Department of Energy

    Office of Environmental Management (EM)

    3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous

  19. DOE F 531 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    531 DOE F 531 This form is used to request Information or Action under the Privacy Act and replaces DOE F 1800.1 (111996) DOE F 531 Privacy Act Information Request Form.pdf ...

  20. EV Everywhere Logo Contest Federal Register Notice

    Broader source: Energy.gov [DOE]

    This is a copy of the notice submitted to the Federal Register for the EV Everywhere logo contest. This document, concerning the EV Everywhere logo contest is an action issued by the Department of...

  1. Memo to DOE re conference call minutes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Memo to DOE re conference call minutes Memo to DOE re conference call minutes DOE Notice of Inquiry on the Convention on Supplementary Compensation for Nuclear Damage (CSC) Contingent Cost Allocation --March 16, 2011 conference call with ConverDyn. Conference call minutes Memo to DOE re conference call minutes (15.08 KB) More Documents & Publications NOPR ConverDyn DOE Notice of Inquiry on the Convention on Supplementary Compensation for Nuclear Damage (CSC) Contingent Cost Allocation -

  2. DOE-STD-1107-97 | Department of Energy

    Energy Savers [EERE]

    Key Radiation Protection Positions at DOE Facilities Change Notice No. 1 (November 2007) This document provides detailed qualification criteria for contractor key radiation ...

  3. Cancellation of DOE O 1340.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-08-27

    The notice cancels DOE O 1340.1B, Management of Public Communications Publications and Scientific, Technical and Engineering Publications, dated 1-7-93.

  4. DOE Takes Steps to Fulfill Obligation Under the Energy Independence...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (DOE) issued a Notice of Inquiry (NOI) soliciting comments from nuclear suppliers, nuclear insurance providers, and other stakeholders on the development of...

  5. DOE Cites Battelle Memorial Institute for Price-Anderson Violations

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The Department of Energy (DOE) today issued a Preliminary Notice of Violation (PNOV) to the Battelle Memorial Institute (Battelle) for nuclear safety violations at the Pacific...

  6. DOE-HDBK-1131-2007 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    December 14, 2007 General Employee Radiological Training Change Notice 1 (June 2009) | Reaffirmed 2013 This handbook describes the DOE General Employee Radiological Training ...

  7. DOE Proposes Requirement for Certification of Admissibility for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 22, 2016 - 6:26pm Addthis DOE has issued a Notice of Proposed Rulemaking (NOPR) ... to an applicable energy conservation standard provide, prior to importation, a ...

  8. Guidance for Site-wide Environmental Impact Statements (DOE,...

    Office of Environmental Management (EM)

    Recommendations on Alternative Analysis in Site-wide NEPA Reviews (DOE, 1992) EIS-0225: Amended Notice of Intent to Prepare an Environmental Impact Statement EIS-0225-SA-03: ...

  9. Notice of Intent to Develop DOE G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    U.S. Department of Energy (DOE) Order 430.1B, Real Property Asset Management, calls for the agency to "establish a corporate, holistic, and performance-based approach to real property life-cycle asset management." It discusses requirements to properly plan, acquire, maintain, recapitalize, and dispose of assets, while recognizing the importance of stakeholder involvement, privatization, cultural and natural preservation, and local economic development.

  10. Notice of Intent to Develop DOE G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-02-19

    U.S. Department of Energy (DOE) Order 430.1B, Real Property Asset Management, calls for the agency to "establish a corporate, holistic, and performance-based approach to real property life-cycle asset management." It discusses requirements to properly plan, acquire, maintain, recapitalize, and dispose of assets, while recognizing the importance of stakeholder involvement, privatization, cultural and natural preservation, and local economic development.

  11. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 ACTION PLAN 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this action plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and the Washington State Hazardous Waste Management Act. All actions required to be taken pursuant to this Agreement shall be taken in accordance

  12. Application of NEPA to CERCLA and RCRA Cleanup Actions

    Broader source: Energy.gov [DOE]

    The document clarifies DOE policies to streamline the environmental review of actions to be taken under CERCLA and RCRA.

  13. Closure Report for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Al Wickline

    2007-08-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 553 are located within Areas 19 and 20 of the Nevada Test Site. Corrective Action Unit 553 is comprised of the following CASs: •19-99-01, Mud Spill •19-99-11, Mud Spill •20-09-09, Mud Spill •20-99-03, Mud Spill The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 553 were met. To achieve this, the following actions were or will be performed: •Review the current site conditions including the concentration and extent of contamination. •Implement any corrective actions necessary to protect human health and the environment. •Properly dispose of corrective action and investigation wastes. •Document the Notice of Completion and closure of CAU 553 to be issued by Nevada Division of Environmental Protection.

  14. Closure Report for Corrective Action Unit 130: Storage Tanks Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Alfred Wickline

    2009-03-01

    COCs for CAU 130. Assessment of the data generated from closure activities indicates that no further action is necessary because no COCs were identified at any CAU 130 CAS. Debris removal from these CASs was considered a best management practice because no contamination was detected. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at all CAU 130 CASs. • A Notice of Completion to DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 130. • Corrective Action Unit 130 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

  15. Westinghouse Lighting: Notice of Allowance (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Allowance to Westinghouse Lighting Corporation allowing Westinghouse Lighting to resume distribution of various lamp products after Westinghouse Lighting provided new test data performed according to DOE regulations.

  16. Westinghouse Lighting: Notice of Allowance (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Allowance to Westinghouse Lighting Corporation allowing Westinghouse Lighting to resume distribution of product code 0521000 after Westinghouse Lighting provided new test data performed according to DOE regulations.

  17. EIS-0498: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    a proposal to build and operate a liquefied natural gas (LNG) facility on land at the Port of Lake Charles. (DOE became a cooperating agency after this notice was issued. DOE,...

  18. Enforcement Notice of Intent to Investigate, UT-Battelle

    Broader source: Energy.gov [DOE]

    The DOE Office of Enforcement issued a Notice of Intent to Investigate potential programmatic deficiencies in implementing requirements for assessing and controlling material handling hazards at DOE's Oak Ridge National Laboratory.

  19. index | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Partnership Notice No research partnership notices are currently posted

  20. Foreign National Access to DOE Cyber Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-01

    DOE N 205.16, dated 9-15-05, extends this Notice until 9-30-06, unless sooner rescinded. To ensure foreign national access to DOE cyber systems continues to advance DOE program objectives while enforcing information access restrictions.