Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Gorm Heron, Steven Carroll, Hank Sowers, Bruce McGee, Randall Juhlin, Joe Daniel, David S. Ingle Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center More Documents & Publications Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification

2

DOE-EMSP Final Report: Characterization of Changes in Colloid and DNAPL Affecting Surface Chemistry and Remediation  

SciTech Connect

The waste disposal to the M-area basin and A-14 outfall at the Savannah River Department of Energy facility in Aiken SC (USA) included a wide variety of inorganic aqueous flows and organic solvents in the form of dense non-aqueous phase liquids (DNAPL). The DNAPL has migrated through the subsurface resulting in widespread groundwater contamination. The goal of this research was to identify and quantify processes that could have affected the migration and remediation of the DNAPL in the subsurface. It was hypothesized that the variety of waste disposed at this site could have altered the mineral, microbial and DNAPL properties at this site relative to other DNAPL sites. The DNAPL was determined to have a very low interfacial tension and is suspected to be distributed in fine grained media, thereby reducing the effectiveness of soil vapor extraction remediation efforts. Although the DNAPL is primarily comprised of tetrachloroethene and trichloroethane, it also contains organic acids and several heavy metals. Experimental results suggest that iron from the aqueous and DNAPL phases undergoes precipitation and dechlorination reactions at the DNAPL-water interface, contributing to the low interfacial tension and acidity of the DNAPL. Biological activity in the contaminated region can also contribute to the low interfacial tension. PCE degrading bacteria produce biosurfactants and adhere to the DNAPL-water interface when stressed by high tetrachloroethene or low dissolved oxygen concentrations. The presence of iron can reduce the interfacial tension by nearly an order of magnitude, while the PCE degraders reduced the interfacial tension by nearly 50%. Abiotic changes in the mineral characteristics were not found to be substantially different between contaminated and background samples. The research completed here begins to shed some insight into the complexities of DNAPL fate and migration at sites where co-disposal of many different waste products occurred. Quantifying the low interfacial tension of the SRS DNAPL helps to formulate a new conceptual picture of the subsurface DNAPL migration and provides an explanation of the limited effectiveness of remediation efforts. Alternative designs for remediation that are more effective for sites with DNAPL in fine grained media are required.

Susan E. Powers; Stefan J. Grimberg; Miles Denham

2007-02-07T23:59:59.000Z

3

Remediation of DNAPLs in Low Permeability Soils. Innovative Technology Summary Report  

Science Conference Proceedings (OSTI)

Dense, non-aqueous phase liquid (DNAPL) compounds like trichloroethene (TCE) and perchloroethene (PCE) are prevalent at U. S. Department of Energy (DOE), other government, and industrial sites. Their widespread presence in low permeability media (LPM) poses severe challenges for assessment of their behavior and implementation of effective remediation technologies. Most remedial methods that involve fluid flow perform poorly in LPM. Hydraulic fracturing can improve the performance of remediation methods such as vapor extraction, free-product recovery, soil flushing, steam stripping, bioremediation, bioventing, and air sparging in LPM by enhancing formation permeability through the creation of fractures filled with high-permeability materials, such as sand. Hydraulic fracturing can improve the performance of other remediation methods such as oxidation, reductive dechlorination, and bioaugmentation by enhancing delivery of reactive agents to the subsurface. Hydraulic fractures are typically created using a 2-in. steel casing and a drive point pushed into the subsurface by a pneumatic hammer. Hydraulic fracturing has been widely used for more than 50 years to stimulate the yield of wells recovering oil from rock at great depth and has recently been shown to stimulate the yield of wells recovering contaminated liquids and vapors from LPM at shallow depths. Hydraulic fracturing is an enabling technology for improving the performance of some remedial methods and is a key element in the implementation of other methods. This document contains information on the above-mentioned technology, including description, applicability, cost, and performance data.

None

2000-09-01T23:59:59.000Z

4

X-231A demonstration of in-situ remediation of DNAPL compounds in low permeability media by soil fracturing with thermally enhanced mass recovery or reactive barrier destruction  

Science Conference Proceedings (OSTI)

The overall goal of the program of activities is to demonstrate robust and cost-effective technologies for in situ remediation of DNAPL compounds in low permeability media (LPM), including adaptations and enhancements of conventional technologies to achieve improved performance for DNAPLs in LPM. The technologies sought should be potential for application at simple, small sites (e.g., gasoline underground storage tanks) as well as at complex, larger sites (e.g., DOE land treatment units). The technologies involved in the X-231A demonstration at Portsmouth Gaseous Diffusion Plant (PORTS) utilized subsurface manipulation of the LPM through soil fracturing with thermally enhanced mass recovery or horizontal barrier in place destruction. To enable field evaluation of these approaches, a set of four test cells was established at the X-231A land treatment unit at the DOE PORTS plant in August 1996 and a series of demonstration field activities occurred through December 1997. The principal objectives of the PORTS X-231A demonstration were to: determine and compare the operational features of hydraulic fractures as an enabling technology for steam and hot air enhanced soil vapor extraction and mass recovery, in situ interception and reductive destruction by zero valent iron, and in situ interception and oxidative destruction by potassium permanganate; determine the interaction of the delivered agents with the LPM matrix adjacent to the fracture and within the fractured zone and assess the beneficial modifications to the transport and/or reaction properties of the LPM deposit; and determine the remediation efficiency achieved by each of the technology strategies.

Siegrist, R.L. [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States); [Colorado School of Mines, Golden, CO (United States). Environmental Science and Engineering Div.; Lowe, K.S. [Oak Ridge National Lab., Grand Junction, CO (United States). Life Sciences Div.] [Oak Ridge National Lab., Grand Junction, CO (United States). Life Sciences Div.; Murdoch, L.D. [FRx, Inc., Cincinnati, OH (United States)] [FRx, Inc., Cincinnati, OH (United States); [Clemson Univ., SC (United States); Slack, W.W. [FRx, Inc., Cincinnati, OH (United States)] [FRx, Inc., Cincinnati, OH (United States); Houk, T.C. [Lockheed Martin Energy Systems, Piketon, OH (United States)] [Lockheed Martin Energy Systems, Piketon, OH (United States)

1998-03-01T23:59:59.000Z

5

Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonaqueous-Phase Liquid Characterization and Post-Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling More Documents & Publications Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center

6

Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonaqueous-Phase Liquid Characterization and Post-Remediation Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling More Documents & Publications Project Overview: Successful Field-Scale In Situ Thermal NAPL Remediation Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young - Rainey STAR Center

7

Initial Results of ISCO for a Large TCE DNAPL Source Area  

SciTech Connect

This paper will describe the results of an in situ chemical oxidation (ISCO) remedial action currently in progress to address subsurface contamination by trichloroethene (TCE) dense nonaqueous phase liquid (DNAPL). The U.S. Department of Energy is responsible for the cleanup of environmental media at the Portsmouth Gaseous Diffusion Plant (PORTS) in southern Ohio. The X-701B Solid Waste Management Unit is an unlined surface impoundment at PORTS which was operated from 1954 to 1988. A TCE plume in groundwater emanates from the unit and is approximately 2,200 feet in length. Metals, radioactive inorganics, and other organic chemicals are also present at lower concentrations in the groundwater. An ongoing 1.6-acre TCE DNAPL source area for the plume is believed to exist up-gradient in the vicinity of the X-701B pond. The extent of the source area is inferred from actual recovery of DNAPL in production wells and from detection of TCE concentrations between 100 and 1,000 mg/L in monitoring wells. Previous remedial activities at X-701B have included a Resource Conservation and Recovery Act (RCRA) closure and a technology demonstration that recirculated permanganate solutions between two horizontal wells. Results of sampling after these remedial activities showed that the permanganate effectively destroyed TCE in portions of the aquifer where adequate contact was achieved, but that uniform distribution by the recirculation system was problematic. As a result, the TCE concentration in the groundwater eventually rebounded after the treatment. To overcome distribution issues and to more aggressively remediate the source, a new remediation approach is being implemented for the unit. The new approach involves the injection of Modified Fenton's Reagent directly into the source area using temporary direct push injection points. This new approach provides the ability to overcome limitations imposed by heterogeneities in the subsurface by injecting relatively small quantities of reagent into a large number of temporary injection points across the source area. These injections are then repeated, as necessary, on a grid pattern until performance goals are achieved. The remediation is being implemented in four phases under a work plan approved by the Ohio Environmental Protection Agency. Phase I, the pilot test, was conducted over a small portion of the source area. Phase II currently involves full-scale treatment of the source area. In Phase III, the source area will be monitored for TCE rebound. Phase IV will involve limited treatment for the down-gradient portion of the plume. (authors)

Thompson, S.L.; Cross, P.E. [CDM, Piketon, OH (United States)

2008-07-01T23:59:59.000Z

8

BARRIER SYSTEM FULL SCALE FIRE TESTING ADDRESSEES  

E-Print Network (OSTI)

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel, and fuel facilities licensees. PURPOSE The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform addressees of the results of Hemyc electrical raceway fire barrier system (ERFBS) full-scale fire tests. The Hemyc ERFBS did not perform for one hour as designed because shrinkage of the Hemyc ERFBS occurred during the testing. It is expected that recipients will review the information for applicability to their facilities and consider actions as appropriate to avoid similar problems. However, suggestions contained in this information notice are not NRC requirements; therefore, no specific action or written response is required. BACKGROUND The Hemyc ERFBS, manufactured by Promatec, Inc., has been installed at nuclear power plants (NPPs) to protect circuits in accordance with regulatory requirements (Reference 1) and plant-specific commitments. As a result of fire protection inspections, unresolved items (URIs) were opened at some nuclear power stations due to questions raised regarding the fire resistance capability of the Hemyc ERFBS (Reference 2). The Office of Nuclear Reactor Regulation (NRR) performed a review of the Hemyc ERFBS (Reference 3) and requested the NRC’s Office of Nuclear Regulatory Research (RES) to perform confirmatory testing of this ERFBS. RES performed the testing at the Omega Point Laboratories in Elmendorf, Texas. DISCUSSION This information notice describes the results of the investigation of the fire resistance capability of the Hemyc ERFBS (Attachment 1). The NRC performed two ASTM E 119 furnace tests on a number of cable raceway types that are protected by the Hemyc ERFBS (with and without air gaps) in accordance with the Hemyc ERFBS test plan (see ADAMS Accession No. ML043210141 for a preliminary version of the test plan). The test plan provides ML050890089 IN 2005-07

unknown authors

2005-01-01T23:59:59.000Z

9

Clean Energy Manufacturing Resources - Technology Full-Scale Production |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Full-Scale Production Full-Scale Production Clean Energy Manufacturing Resources - Technology Full-Scale Production Clean Energy Manufacturing Resources - Technology Full-Scale Production Find resources to help you design a production and manufacturing process for a new clean energy technology or product. For full-scale production, other areas to consider include workforce development; R&D funding; and regional, state, and local resources. For more resources, see the Clean Energy Manufacturing Federal Resource Guide. Design Production and Manufacturing Process Advanced Research Projects Agency: Tech-to-Market Resources - general tech-to-market (T2M) resources. DOE Advanced Manufacturing Office: Manufacturing Demonstration Facility - a collaborative manufacturing community that works to provide real data to

10

Full-Scale Tornado-Missile Impact Tests  

Science Conference Proceedings (OSTI)

The testing described in this report provides data from full-scale simulated tornado-missile impacts on reinforced concrete walls. These data can be used directly for design and for the development of improved design and analysis techniques.

1977-07-01T23:59:59.000Z

11

Property:Full-Scale Test | Open Energy Information  

Open Energy Info (EERE)

Full-Scale Test Full-Scale Test Jump to: navigation, search Property Name Full-Scale Test Property Type Text Pages using the property "Full-Scale Test" Showing 13 pages using this property. M MHK Technologies/Atlantis AN 150 + The AN150 system was connected to the SPAusNet Victorian electricity grid exporting renewable power for from 2008 to 2012 Atlantis received power sales revenue and RECs Renewable Energy Certificates during this period of operation MHK Technologies/Atlantis AR 1000 + Atlantis connect its 1MW AR1000 tidal turbine to the grid at the European Marine Energy Centre EMEC in Orkney Scotland on Thursday the 11th August 2011 Atlantis Resources Corporation will continue its AR1000 tidal turbine testing programme at the National Renewable Energy Centre Narec in Blyth Northumberland The company s AR1000 nacelle was retrieved from its test berth at the European Marine Energy Centre EMEC in Orkney in late November following successful open ocean testing It will be transported to Blyth for preparation ahead of the spring opening of Narec s 3MW capacity turbine drive train testing facility The independent onshore facility has been developed to de risk in field activities conducting reliability and performance appraisals of new devices and system components through accelerated lifetime testing

12

WEFTEC 2006, Dallas, Texas FULL SCALE EVALUATION OF THE UPFLOTM  

E-Print Network (OSTI)

WEFTEC 2006, Dallas, Texas FULL SCALE EVALUATION OF THE UPFLOTM FILTER - A CATCHBASIN INSERT *** Hydro International, Portland, ME 04102, USA **** StormTrain, LLC. Ann Arbor MI USA ABSTRACT Stormwater of problem contaminants or heavy equipment. The control of runoff from relatively small critical source areas

Pitt, Robert E.

13

Operational experience from three full scale methane digesters  

Science Conference Proceedings (OSTI)

Three full scale anaerobic digesters are described and operational experience is discussed. The digesters are located in Monroe, Washington on a 200 head dairy; in Bartow, Florida on a 10,000 head feedlot; and in Bedford, Virginia on a 100 head dairy. 11 refs.

Coppinger, E.R.; Richter, M.

1981-01-01T23:59:59.000Z

14

NETL: Mercury Emissions Control Technologies - Full- Scale Testing of  

NLE Websites -- All DOE Office Websites (Extended Search)

Full-Scale Testing of Enhanced Mercury Control in Wet FGD Full-Scale Testing of Enhanced Mercury Control in Wet FGD The goal of this project is to commercialize methods for the control of mercury in coal-fired electric utility systems equipped with wet flue gas desulfurization (wet FGD). The two specific objectives of this project are 1) ninety percent (90%) total mercury removal and 2) costs below 1/4 to 1/2 of today's commercially available activated carbon mercury removal technologies. Babcock and Wilcox and McDermott Technology, Inc's (B&W/MTI's) will demonstrate their wet scrubbing mercury removal technology (which uses very small amounts of a liquid reagent to achieve increased mercury removal) at two locations burning high-sulfur Ohio bituminous coal: 1) Michigan South Central Power Agency's (MSCPA) 55 MWe Endicott Station located in Litchfield, Michigan and 2) Cinergy's 1300 MWe Zimmer Station located near Cincinnati, Ohio.

15

DNAPL Site Characterization for Waste Management at Manufactured Gas Plant (MGP) Sites  

Science Conference Proceedings (OSTI)

Determining the optimal waste management strategy at manufactured gas plant (MGP) sites requires adequate site characterization to provide data for remediation decisions, a task that is particularly challenging when dense nonaqueous phase liquids (DNAPLs) are present. This report discusses development of an appropriate characterization strategy, including parameters that should be characterized, tools for characterization and the relation between characterization goals, a developing site conceptual model...

2004-12-22T23:59:59.000Z

16

Caustic-Side Solvent Extraction Full-Scale Test  

Science Conference Proceedings (OSTI)

A Full-Scale Test (FST) program was performed by Parsons and its team members General Atomics and Energy Solutions to assess the performance of full-scale centrifugal contactors specified for the Department of Energy Salt Waste Processing Facility (SWPF). The SWPF, to be located at the Savannah River Site (SRS) in Aiken, South Carolina, will remove highly radioactive waste constituents, principally actinides, strontium (Sr), and cesium (Cs) radionuclides, from salt waste solutions currently stored in SRS high-level waste tanks. Caustic-side Solvent Extraction (CSSX) removes Cs from waste feed that has been treated upstream to remove actinides and Sr. CSSX uses a custom solvent to extract Cs from the salt solution in a series of single stage centrifugal contactors. The test system comprised (a) eleven 25.4 cm (10'') full-scale contactors (versus 36 in SWPF) for the extraction, scrub, strip, and wash stages; (b) two solvent recovery coalescers; and (c) the associated hardware and control system, packaged in four skid mounted modules. This paper describes the results of tests performed to define both hydraulic performance parameters (maximum hydraulic capacity and phase carryover) and solvent extraction performance parameters (Cs mass transfer efficiencies) using simulated SWPF waste and actual CSSX solvent. The test results confirmed key design features of the CSSX process and, as a consequence, the use of CSSX in the SWPF. In conclusion: Total throughput was initially limited to 85% of maximum flow during FST. Minor system modifications performed prior to mass transfer testing series resulted in the realization of 100% throughput. The 100% flow equates to slightly more than 35.6 x 10{sup 6} L/yr (9.4 Mgal/yr) of waste processed in SWPF which is anticipated to be the peak plant throughput. To achieve the best hydraulic performance in extraction, it is recommended that the extraction contactors be operated at the highest reasonable speed possible (>2100 rpm). Vibration, hardware limitations, bearing life, and other factors should be considered prior to final selection of extraction contactor speeds in SWPF. In strip (also scrub and wash) aqueous carryover decreased and organic carryover increased as the rotor speeds increased. It is recommended that the strip, scrub, and wash contactors be operated at intermediate speeds (between 1500 and 2100 rpm) to achieve a performance compromise between aqueous and organic carryover. Curved-vane bottom plates showed a significant hydraulic performance (aqueous and organic carryover) advantage over straight-vane bottom plates in extraction. There was no significant mass transfer performance advantage for either plate type in extraction. Thus, curved-vane bottom plates in extraction may be the better option for use in SWPF. There was no significant hydraulic performance difference between the plate types in strip. Straight-vanes provided significantly better mass transfer performance in strip compared to curved-vanes. Based solely on mass transfer performance, straight-vane bottom plates in the strip, scrub, and wash contactors are recommended for use in SWPF. Utilizing straight-vanes in the stripping section, the overall SWPF CSSX performance is expected to meet or exceed the target DF of 40,000 with minimum extraction D{sub Cs} of 10. (authors)

Lentsch, R.D.; Stephens, A.B. [General Atomics, San Diego, CA (United States); Bartling, K.E. [Parsons, Aiken, SC (United States); Singer, S.A. [Energy Solutions, Aiken, SC (United States)

2008-07-01T23:59:59.000Z

17

Temperature Measurements in Full-Scale Wood Stud Shear Walls  

E-Print Network (OSTI)

This report presents the results of 10 full-scale fire resistance tests conducted at the National Fire Laboratory on load-bearing gypsum board protected, wood stud shear wall assemblies with and without resilient channels on the fire-exposed side. The two assembly arrangements studied were: symmetrical installation 1x1 (one layer of gypsum board on each of the exposed and unexposed sides) and asymmetrical installation of the shear membrane (one layer of gypsum board on both the exposed and unexposed sides and a shear wall membrane as a base layer alternating between the exposed (2x1) and unexposed sides (1x2)) on a wood stud frame. The gypsum board was 12.7 mm thick Type X. The insulations used were glass and rock fibres. The shear membranes used were plywood and oriented strand board (OSB). Tests were conducted to determine the effects of the placement of the shear membrane on the exposed/unexposed face, type of shear membrane, insulation type, load intensity and resilient channel installations on the fire resistance of gypsum board protected, wood stud shear wall assemblies. Details of the results, including the temperatures and deflections measured during the fire tests, are presented. ACKNOWLEDGEMENTS This research is part of a consortium project on the fire resistance and sound performance of wall assemblies - Phase II, among the following partners: . Canadian Wood Council . Canadian Home Builders Association . Canadian Sheet Steel Building Institute . Gypsum Manufacturers of Canada . Owens-Corning Canada . Roxul Inc.

V. K. R. Sultan; M. A. Denham; V. K. R. Kodur; M. A. Sultan; E. M. A. Denham; Canadian Wood Council; Shear Walls; Shear Walls; Shear Walls; Shear Walls

1996-01-01T23:59:59.000Z

18

A full-scale demonstration of in situ chemical oxidation through recirculation at the X-701B site  

Science Conference Proceedings (OSTI)

In 1996, researchers at Oak Ridge National Laboratory (ORNL) proposed an oxidant delivery technique involving injection and recirculation of the oxidant solution into a contaminated aquifer through multiple horizontal and vertical wells. This technique would be applicable to saturated, hydraulically conductive formations. In the spring of 1997, the Department of Energy (DOE) at the Portsmouth Gaseous Diffusion Plant (PORTS) agreed to collaborate with the DOE`s Subsurface Contaminants Focus Area to conduct a field-scale treatability study using in situ chemical oxidation through recirculation (ISCOR). PORTS agreed to support the demonstration at the X-701B site where the technology can potentially be used to remediate TCE-contaminated groundwater and sediments. The ISCOR field demonstration took advantage of existing infrastructure and extensive site characterization data generated from previous field demonstrations at X-701B. The field test was implemented using a pair of previously installed horizontal wells that transect an area of DNAPL contamination. Groundwater was extracted from one horizontal well, pumped to an existing pump and treat facility, dosed with KMnO{sub 4}, and re-injected into a parallel horizontal well approximately 90 ft away. The field demonstration lasted approximately one month. Treatment effectiveness was determined by comparing contaminant levels in pre-treatment, during, and post-treatment groundwater samples and pre- and post-treatment soil samples.

West, O.R.; Cline, S.R.; Holden, W.L.; Gardner, F.G.; Schlosser, B.M.; Thate, J.E.; Pickering, D.A. [Oak Ridge National Lab., TN (United States); Houk, T.C. [Lockheed Martin Energy Systems Technology Applications, Piketon, OH (United States)

1997-12-01T23:59:59.000Z

19

An empirical study of a full-scale polymer thermochromic window...  

NLE Websites -- All DOE Office Websites (Extended Search)

An empirical study of a full-scale polymer thermochromic window and its implications on material science development objectives Title An empirical study of a full-scale polymer...

20

Los Alamos National Laboratory marks 20 years without full-scale...  

NLE Websites -- All DOE Office Websites (Extended Search)

nuclear testing Los Alamos National Laboratory marks 20 years without full-scale nuclear testing The test, code named "Divider," was detonated on Sept. 23, 1992 as the...

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Approximating game-theoretic optimal strategies for full-scale poker  

Science Conference Proceedings (OSTI)

The computation of the first complete approximations of game-theoretic optimal strategies for full-scale poker is addressed. Several abstraction techniques are combined to represent the game of 2-player Texas Hold'em, having size O(1018), ...

D. Billings; N. Burch; A. Davidson; R. Holte; J. Schaeffer; T. Schauenberg; D. Szafron

2003-08-01T23:59:59.000Z

22

Demonstration of a Full-Scale Retrofit of the Advanced Hybrid...  

NLE Websites -- All DOE Office Websites (Extended Search)

component of the DOE Fossil Energy Coal R&D Program and then demonstrated under the Power Plant Improvement Initiative. A full-scale demonstration of the Advanced Hybrid(tm) was...

23

Carlsbad Area Office unveils full-scale model of new WIPP waste transportation cask  

NLE Websites -- All DOE Office Websites (Extended Search)

Carlsbad Area Office Unveils Full-Scale Model Carlsbad Area Office Unveils Full-Scale Model Of New WIPP Waste Transportation Cask CARLSBAD, N.M., February 23, 2000 - The U.S. Department of Energy's (DOE) Carlsbad Area Office today unveiled a full-scale model of its newest waste transportation cask, the RH-72B, during a ceremony at the local DOE offices. "This is another milestone for the Department of Energy," said Dr. Inés Triay, Manager of the Carlsbad Area Office, describing the importance of the new container for those attending the ceremony. "After we receive approval from the U.S. Nuclear Regulatory Commission (NRC), we plan to add the RH-72B to our fleet, which will help the Department meet its continuing mission to remove transuranic waste from the accessible environment and

24

Full-scale and bench-scale testing of a coal-fueled gas turbine system  

SciTech Connect

Components for a coal-fueled industrial gas turbine were developed and tested at both benchscale and full-scale. The components included a two stage slagging combustor, a particulate rejection impact separator (PRIS), and a secondary particulate filter. The Integrated Bench Scale Test Facility (IBSTF) was used for the filter tests ana some of the PRIS testing. Full-scale combustor testing has been carried-out both with and without the PRIS. Bench-scale testing has included evaluating the feasibility of on-site CWM preparation, developing a water-cooled impactor and an extended run with new secondary candle filters.

Roberts, P.B.; LeCren, R.T.; Cowell, L.H.; Galica, M.A.; Stephenson, M.D.; Wen, C.S.

1992-01-01T23:59:59.000Z

25

Full-scale and bench-scale testing of a coal-fueled gas turbine system  

SciTech Connect

Components for a coal-fueled industrial gas turbine were developed and tested at both benchscale and full-scale. The components included a two stage slagging combustor, a particulate rejection impact separator (PRIS), and a secondary particulate filter. The Integrated Bench Scale Test Facility (IBSTF) was used for the filter tests ana some of the PRIS testing. Full-scale combustor testing has been carried-out both with and without the PRIS. Bench-scale testing has included evaluating the feasibility of on-site CWM preparation, developing a water-cooled impactor and an extended run with new secondary candle filters.

Roberts, P.B.; LeCren, R.T.; Cowell, L.H.; Galica, M.A.; Stephenson, M.D.; Wen, C.S.

1992-12-31T23:59:59.000Z

26

The in-situ decontamination of sand and gravel aquifers by chemically enhanced solubilization of multiple-compound DNAPLs with surfactant solutions: Phase 1 -- Laboratory and pilot field-scale testing and Phase 2 -- Solubilization test and partitioning and interwell tracer tests. Final report  

Science Conference Proceedings (OSTI)

Laboratory, numerical simulation, and field studies have been conducted to assess the potential use of micellar-surfactant solutions to solubilize chlorinated solvents contaminating sand and gravel aquifers. Ninety-nine surfactants were screened for their ability to solubilize trichloroethene (TCE), perchloroethylene (PCE), and carbon tetrachloride (CTET). The field test was conducted in the alluvial aquifer which is located 20 to 30 meters beneath a vapor degreasing operation at Paducah Gaseous Diffusion Plant. This aquifer has become contaminated with TCE due to leakage of perhaps 40,000 liters of TCE, which has generated a plume of dissolved TCE extending throughout an area of approximately 3 km{sup 2} in the aquifer. Most of the TCE is believed to be present in the overlying lacustrine deposits and in the aquifer itself as a dense, non-aqueous phase liquid, or DNAPL. The objective of the field test was to assess the efficacy of the surfactant for in situ TCE solubilization. Although the test demonstrated that sorbitan monooleate was unsuitable as a solubilizer in this aquifer, the single-well test was demonstrated to be a viable method for the in situ testing of surfactants or cosolvents prior to proceeding to full-scale remediation.

NONE

1997-10-24T23:59:59.000Z

27

Full-Scale Boiler Measurements Demonstrating Striated Flows during Biomass Co-Firing  

E-Print Network (OSTI)

ACERC-2008 Full-Scale Boiler Measurements Demonstrating Striated Flows during Biomass Co based measurements methods #12;Objective Minor impact of biomass cofiring with coal on boiler operation) · Experimentally demonstrate the existence of stratified flows in boilers Indication: SO2, ash composition, straw

28

DOE/NETL's Phase II Plans for Full-Scale Mercury Removal Technology Field-Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Phase II Plans for Full-Scale Phase II Plans for Full-Scale Mercury Removal Technology Field-Testing Air Quality III September 12, 2002 Arlington, Va Scott Renninger, Project Manager for Mercury Control Technology Enviromental Projects Division Presentation Outline * Hg Program goals & objectives * Focus on Future Hg control R&D * Q&As President Bush's Clear Skies Initiative Current Mid-Term 2008-2010 2018 SO 2 11 million tons 4.5 million tons 3 million tons NOx 5 million tons 2.1 million tons 1.7 million tons Mercury 48 tons 26 tons 15 tons Annual U.S. Power Plant Emissions Mercury Control * Developing technologies ready for commercial demonstration: - By 2005, reduce emissions 50-70% - By 2010, reduce emissions by 90% - Cost 25-50% less than current estimates 2000 Year 48 Tons $2 - 5 Billion @ 90% Removal w/Activated

29

Radiant Barrier Insulation Performance in Full Scale Attics with Soffit and Ridge Venting  

E-Print Network (OSTI)

There is a limited data base on the full scale performance of radiant barrier insulation in attics. The performance of RBS have been shown to be dependent on attic ventilation characteristics. Tests have been conducted on a duplex located in Florida with soffit and ridge venting to measure attic performance. The unique features of these experiments are accurate and extensive instrumentation with heat flow meters, field verification of HFM calibration, extensive characterization of the installed ceiling insulation, ventilation rate measurements and extensive temperature instrumentation. The attics are designed to facilitate experimental changes without damaging the installed insulation. RBS performance has been measured for two natural ventilation levels for soffit and ridge venting. Previously, no full scale data have been developed for these test configurations. Test data for each of the test configurations was acquired for a minimum of two weeks with some acquired over a five week period. The Rl9 insulation performed as expected.

Ober, D. G.; Volckhausen, T. W.

1988-01-01T23:59:59.000Z

30

Measurement and Verification for Behavioral Programs: Evaluating Programs That Have Gone Full-Scale  

Science Conference Proceedings (OSTI)

The evaluation of behavioral programs requires rigorous measurement and verification. While the randomized controlled trial (RCT) lies at the core of modern program evaluation, in most situations it is not feasible to implement a randomized approach. This is particularly true when programs have gone full-scale and the success of the program needs to be evaluated outside of the confines of an experimental framework involving the random allocation of households to treatment and control ...

2013-12-16T23:59:59.000Z

31

DEMONSTRATION OF A FULL-SCALE RETROFIT OF THE ADVANCED HYBRID PARTICULATE COLLECTOR TECHNOLOGY  

Science Conference Proceedings (OSTI)

The Advanced Hybrid Particulate Collector (AHPC), developed in cooperation between W.L. Gore & Associates and the Energy & Environmental Research Center (EERC), is an innovative approach to removing particulates from power plant flue gas. The AHPC combines the elements of a traditional baghouse and electrostatic precipitator (ESP) into one device to achieve increased particulate collection efficiency. As part of the Power Plant Improvement Initiative (PPII), this project was demonstrated under joint sponsorship from the U.S. Department of Energy and Otter Tail Power Company. The EERC is the patent holder for the technology, and W.L. Gore & Associates was the exclusive licensee for this project. The project objective was to demonstrate the improved particulate collection efficiency obtained by a full-scale retrofit of the AHPC to an existing electrostatic precipitator. The full-scale retrofit was installed on an electric power plant burning Powder River Basin (PRB) coal, Otter Tail Power Company's Big Stone Plant, in Big Stone City, South Dakota. The $13.4 million project was installed in October 2002. Project related testing concluded in December 2005. The following Final Technical Report has been prepared for the project entitled ''Demonstration of a Full-Scale Retrofit of the Advanced Hybrid Particulate Collector Technology'' as described in DOE Award No. DE-FC26-02NT41420. The report presents the operation and performance results of the system.

Tom Hrdlicka; William Swanson

2005-12-01T23:59:59.000Z

32

NETL: Mercury Emissions Control Technologies - Full-Scale Field Trial of  

NLE Websites -- All DOE Office Websites (Extended Search)

Full-Scale Field Trial of the Low Temperature Mercury Capture Process Full-Scale Field Trial of the Low Temperature Mercury Capture Process CONSOL R&D, PPL, Lechler, and Martin Marietta propose to conduct a field trial of the Low-Temperature Mercury Control (LTMC) process at Unit 1 of the PPL Martins Creek Station. LTMC has the ability to reduce mercury emissions by over 90% as was recently demonstrated by CONSOL R&D on a slip-stream pilot plant at the Allegheny Energy Mitchell Station under DOE Cooperative Agreement DE-FC26-01NT41181. The next step is to demonstrate the performance, operability, and economics on a full-scale utility boiler. In addition this project will demonstrate that magnesium hydroxide (Mg(OH)2 ) slurry injection into the flue gas reduces SO3 concentration sufficiently to avoid corrosion at the low-temperature conditions, and will demonstrate that water spray humidification can maintain ESP performance under low-SO3 conditions.

33

Full-Scale Structural and NDI Validation Tests of Bonded Composite Doublers for Commercial Aircraft Applications  

Science Conference Proceedings (OSTI)

Composite doublers, or repair patches, provide an innovative repair technique which can enhance the way aircraft are maintained. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is possible to bond a single Boron-Epoxy composite doubler to the damaged structure. Most of the concerns surrounding composite doubler technology pertain to long-term survivability, especially in the presence of non-optimum installations, and the validation of appropriate inspection procedures. This report focuses on a series of full-scale structural and nondestructive inspection (NDI) tests that were conducted to investigate the performance of Boron-Epoxy composite doublers. Full-scale tests were conducted on fuselage panels cut from retired aircraft. These full-scale tests studied stress reductions, crack mitigation, and load transfer capabilities of composite doublers using simulated flight conditions of cabin pressure and axial stress. Also, structures which modeled key aspects of aircraft structure repairs were subjected to extreme tension, shear and bending loads to examine the composite laminate's resistance to disbond and delamination flaws. Several of the structures were loaded to failure in order to determine doubler design margins. Nondestructive inspections were conducted throughout the test series in order to validate appropriate techniques on actual aircraft structure. The test results showed that a properly designed and installed composite doubler is able to enhance fatigue life, transfer load away from damaged structure, and avoid the introduction of new stress risers (i.e. eliminate global reduction in the fatigue life of the structure). Comparisons with test data obtained prior to the doubler installation revealed that stresses in the parent material can be reduced 30%--60% through the use of the composite doubler. Tests to failure demonstrated that the bondline is able to transfer plastic strains into the doubler and that the parent aluminum skin must experience significant yield strains before any damage to the doubler will occur.

Roach, D.; Walkington, P.

1999-02-01T23:59:59.000Z

34

Full-scale facility for evaluating lost circulation materials and techniques  

DOE Green Energy (OSTI)

Sandia National Laboratories has designed and built a full-scale facility for the evaluation of lost circulation materials and techniques under simulated down-hole geothermal wellbore conditions. System capabilities include a maximum temperature of 400/sup 0/F, maximum allowed working pressure of 1150 psi, and a variable pumping rate up to 280 gpm at 1000 psi. The system will be utilized to evaluate candidate lost circulation materials and techniques that may be useful to solving geothermal well drilling lost circulation problems.

Loeppke, G.E.; Caskey, B.C.

1983-01-01T23:59:59.000Z

35

NETL: News Release - Energy Department Approves Full-Scale Demonstration of  

NLE Websites -- All DOE Office Websites (Extended Search)

7 , 2006 7 , 2006 Energy Department Approves Full-Scale Demonstration of Coal Dryer Innovative Technology Promises More Power, Lower Costs, Reduced Emissions WASHINGTON, DC - Building on the continuous operation of a prototype coal dryer that uses waste heat to remove moisture from coal, the U.S. Department of Energy (DOE) has given the go-ahead to Great River Energy to conduct the first-ever full-scale demonstration of the utility company's innovative technology. Great River Energy will soon begin the demonstration at its Coal Creek Station near Underwood, N.D., during the second phase of a cost-shared project with DOE. The $31.5 million project, which received $13.5 million in funding from DOE, was one of eight projects selected in the first phase of DOE's Clean Coal Power Initiative, a 10-year $2-billion commitment to advance of clean coal technologies and an integral part of the Administration's National Energy Policy. The projects are managed by DOE's National Energy Technology Laboratory.

36

Mitigation of tank 241-SY-101 by pump mixing: Results of full-scale testing  

Science Conference Proceedings (OSTI)

The Full-Scale Mixer Pump Test Program was performed in Hanford Tank 241-SY-101 from February 4 to April 13, 1994, to confirm the long-term operational strategy for flammable gas mitigation and to demonstrate that mixing can control the gas release and waste level. Since its installation on July 3, 1993, the current pump, operating only a few hours per week, has proved capable of mixing the waste sufficiently to release gas continuously instead of in large episodic events. The results of Full-Scale Testing demonstrated that the pump can control gas release and waste level for long-term mitigation, and the four test sequences formed the basis for the long-term operating schedule. The last test sequence, jet penetration tests, showed that the current pump jet creates flow near the tank wall and that it can excavate portions of the bottom sludge layer if run at maximum power. Pump mixing has altered the {open_quote}normal{close_quote} configuration of the waste; most of the original nonconvective sludge has been mixed with the supernatant liquid into a mobile convective slurry that has since been maintained by gentle pump operation and does not readily return to sludge.

Stewart, C.W.; Hudson, J.D.; Friley, J.R.; Panisko, F.E.; Antoniak, Z.I.; Irwin, J.J.; Fadeff, J.G.; Efferding, L.F.; Michener, T.E.; Kirch, N.W. [and others

1994-06-01T23:59:59.000Z

37

NETL: News Release - Full Scale Direct FuelCell? Completes One Year of  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2000 March 31, 2000 Full Scale Direct FuelCellTM Completes One Year of Operation Confirms Performance and Durability of New Energy Generating Technology A commercial design of an advanced fuel cell - the building block of a family of environmentally super-clean, fuel-flexible power plants - has passed several milestones in a joint public-private development effort. FuelCell Energy's Direct Fuel Cell The Direct FuelCell is a versatile, combustion-less power source being developed in the Department of Energy's fuel cell research program. It can use natural gas, methanol, ethanol, bio-gas or other hydrogen-rich fuels. FuelCell Energy, Inc. has completed one year of commercial design validation and endurance testing of a 250 kilowatt-class Direct FuelCellTM

38

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System  

SciTech Connect

This document presents and discusses results from Cooperative Agreement DE-FC26-06NT42778, 'Full-scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System,' which was conducted over the time-period July 24, 2006 through June 30, 2010. The objective of the project was to demonstrate at full scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in pulverized-coal-fired flue gas. Oxidized mercury is removed downstream in wet flue gas desulfurization (FGD) absorbers and collected with the byproducts from the FGD system. The project was co-funded by EPRI, the Lower Colorado River Authority (LCRA), who also provided the host site, Great River Energy, Johnson Matthey, Southern Company, Salt River Project (SRP), the Tennessee Valley Authority (TVA), NRG Energy, Ontario Power and Westar. URS Group was the prime contractor and also provided cofunding. The scope of this project included installing and testing a gold-based catalyst upstream of one full-scale wet FGD absorber module (about 200-MW scale) at LCRA's Fayette Power Project (FPP) Unit 3, which fires Powder River Basin coal. Installation of the catalyst involved modifying the ductwork upstream of one of three wet FGD absorbers on Unit 3, Absorber C. The FGD system uses limestone reagent, operates with forced sulfite oxidation, and normally runs with two FGD modules in service and one spare. The full-scale catalyst test was planned for 24 months to provide catalyst life data. Over the test period, data were collected on catalyst pressure drop, elemental mercury oxidation across the catalyst module, and mercury capture by the downstream wet FGD absorber. The demonstration period began on May 6, 2008 with plans for the catalyst to remain in service until May 5, 2010. However, because of continual increases in pressure drop across the catalyst and concerns that further increases would adversely affect Unit 3 operations, LCRA decided to end the demonstration early, during a planned unit outage. On October 2, 2009, Unit 3 was taken out of service for a fall outage and the catalyst upstream of Absorber C was removed. This ended the demonstration after approximately 17 months of the planned 24 months of operation. This report discusses reasons for the pressure drop increase and potential measures to mitigate such problems in any future application of this technology. Mercury oxidation and capture measurements were made on Unit 3 four times during the 17-month demonstration. Measurements were performed across the catalyst and Absorber C and 'baseline' measurements were performed across Absorber A or B, which did not have a catalyst upstream. Results are presented in the report from all four sets of measurements during the demonstration period. These results include elemental mercury oxidation across the catalyst, mercury capture across Absorber C downstream of the catalyst, baseline mercury capture across Absorber A or B, and mercury re-emissions across both absorbers in service. Also presented in the report are estimates of the average mercury control performance of the oxidation catalyst technology over the 17-month demonstration period and the resulting mercury control costs.

Gary Blythe; Jennifer Paradis

2010-06-30T23:59:59.000Z

39

Full-scale demonstration Low-NO sub x Cell trademark Burner retrofit  

Science Conference Proceedings (OSTI)

The overall objectives of the full-Scale Low-NOx Cell{trademark} Burner (LNCB{trademark}) Retrofit project is to demonstrate the cost-effective reduction of NOx generated by a large, base-loaded (70% capacity factor or greater), coal-fired utility boiler. Specific objectives include: (1) At least 50% NOx reduction over standard two-nozzle cell burners, without degradation of boiler performance or life; (2) acquire and evaluate emission and boiler performance data before and after the retrofit to determine NOx reduction and impact on overall boiler performance; (3) demonstrate that the LNCB{trademark} retrofits are the most cost-effective alternative to emerging, or commercially-available NOx control technology for units equipped with cell burners. The focus of this demonstration is to determine maximum NOx reduction capabilities without adversely impacting plant performance, operation and maintenance.

Not Available

1992-03-18T23:59:59.000Z

40

Emissions Resulting from the Full-Scale Cofiring of Pelletized Refuse-Derived Fuel and Coal  

E-Print Network (OSTI)

Full-scale cofiring tests of binder-enhanced pellets of densified, refuse-derived fuel (dRDF) and high-sulfur coal were conducted during June and July of 1987 in Boiler #5 at Argonne National Laboratory. These tests were conducted with industry, state, and municipality participation both in critiquing the test plan and in witnessing the actual test runs. Approximately 600 tons of dRDF containing 0%, 4%, or 8% binder were blended with high-sulfur coal at levels of up to 30%, based on the BTU content. This paper describes the dRDF/coal cofiring tests, the emissions and ash samples that were taken, the analyses that were conducted on these samples, preliminary test results, and future research plans.

Ohlsson, O. O.; Daugherty, K.; Venables, B.

1988-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Surface runoff from full-scale coal combustion product pavements during accelerated loading  

Science Conference Proceedings (OSTI)

In this study, the release of metals and metalloids from full-scale portland cement concrete pavements containing coal combustion products (CCPs) was evaluated by laboratory leaching tests and accelerated loading of full-scale pavement sections under well-controlled conditions. An equivalent of 20 years of highway traffic loading was simulated at the OSU/OU Accelerated Pavement Load Facility (APLF). Three types of portland cement concrete driving surface layers were tested, including a control section (i.e., ordinary portland cement (PC) concrete) containing no fly ash and two sections in which fly ash was substituted for a fraction of the cement; i.e., 30% fly ash (FA30) and 50% fly ash (FA50). In general, the concentrations of minor and trace elements were higher in the toxicity characteristic leaching procedure (TCLP) leachates than in the leachates obtained from synthetic precipitation leaching procedure and ASTM leaching procedures. Importantly, none of the leachate concentrations exceeded the TCLP limits or primary drinking water standards. Surface runoff monitoring results showed the highest release rates of inorganic elements from the FA50 concrete pavement, whereas there were little differences in release rates between PC and FA30 concretes. The release of elements generally decreased with increasing pavement loading. Except for Cr, elements were released as particulates (>0.45 {mu} m) rather than dissolved constituents. The incorporation of fly ash in the PC cement concrete pavements examined in this study resulted in little or no deleterious environmental impact from the leaching of inorganic elements over the lifetime of the pavement system.

Cheng, C.M.; Taerakul, P.; Tu, W.; Zand, B.; Butalia, T.; Wolfe, W.; Walker, H. [Western Kentucky University, Bowling Green, KY (United States)

2008-08-15T23:59:59.000Z

42

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 2008 contacts thomas J. Feeley III Technology Manager Environmental & Water Resources National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-6134 thomas.feeley@netl.doe.gov charles E. Miller Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-5745 charles.miller@netl.doe.gov Gary Blythe Principal Investigator URS Corp. 9400 Amberglen Blvd. P.O. Box 201088 Austin, Texas 78720 512-419-5321 gary_blythe@urscorp.com Environmental and Water Resources Full-Scale TeSTing oF a Mercury oxidaTion caTalyST upSTreaM oF a WeT Fgd SySTeM Background To provide alternatives for power plant owners to comply with the Clean Air Mercury Rule promulgated by the U.S. Environmental Protection Agency, NETL is

43

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell is nearly complete with only the biofilter remaining and is scheduled to be complete by the end of August 2003. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2003-08-01T23:59:59.000Z

44

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Construction is complete on the 3.5-acre anaerobic cell and liquid addition has commenced. Construction of the 2.5-acre aerobic cell is nearly complete with only the biofilter remaining and construction of the west-side 6-acre anaerobic cell is nearly complete with only the liquid addition system remaining. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2003-05-01T23:59:59.000Z

45

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Construction is complete on the 3.5-acre anaerobic cell and liquid addition has commenced. Construction of the 2.5 acre aerobic cell is nearly complete with only the blower station and biofilter remaining. Waste placement and instrumentation installation is ongoing in the west-side 6-acre anaerobic cell. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2002-08-01T23:59:59.000Z

46

Direct and full-scale experimental verifications towards ground-satellite quantum key distribution  

E-Print Network (OSTI)

Quantum key distribution (QKD), provides the only intrinsically unconditional secure method for communication based on principle of quantum mechanics. Compared with fiber-based demonstrations-, free-space links could provide the most appealing solution for much larger distance. Despite of significant efforts, so far all realizations rely on stationary sites. Justifications are therefore extremely crucial for applications via a typical Low Earth Orbit Satellite (LEOS). To achieve direct and full-scale verifications, we demonstrate here three independent experiments with a decoy-state QKD system overcoming all the demanding conditions. The system is operated in a moving platform through a turntable, a floating platform through a hot-air balloon, and a huge loss channel, respectively, for substantiating performances under rapid motion, attitude change, vibration, random movement of satellites and in high-loss regime. The experiments cover expanded ranges for all the leading parameters of LEOS. Our results pave the way towards ground-satellite QKD and global quantum communication network.

Jian-Yu Wang; Bin Yang; Sheng-Kai Liao; Liang Zhang; Qi Shen; Xiao-Fang Hu; Jin-Cai Wu; Shi-Ji Yang; Hao Jiang; Yan-Lin Tang; Bo Zhong; Hao Liang; Wei-Yue Liu; Yi-Hua Hu; Yong-Mei Huang; Bo Qi; Ji-Gang Ren; Ge-Sheng Pan; Juan Yin; Jian-Jun Jia; Yu-Ao Chen; Kai Chen; Chen-Zhi Peng; Jian-Wei Pan

2012-10-29T23:59:59.000Z

47

Full Scale Bioreactor Landfill for Carbon Sequestration and Greenhouse Emission Control  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works constructed a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective was to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entailed the construction of a 12-acre module that contained a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells were highly instrumented to monitor bioreactor performance. Liquid addition commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell and biofilter has been completed. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Kathy Sananikone; Don Augenstein

2005-03-30T23:59:59.000Z

48

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell and biofilter has been completed. The remaining task to be completed is to test the biofilter prior to operation, which is currently anticipated to begin in January 2004. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2003-12-01T23:59:59.000Z

49

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches while providing superior environmental protection. The overall objective is to manage landfill solid waste for rapid waste decomposition, maximum landfill gas generation and capture, and minimum long-term environmental consequences. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2002-01-01T23:59:59.000Z

50

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches while providing superior environmental protection. The overall objective is to manage landfill solid waste for rapid waste decomposition, maximum landfill gas generation and capture, and minimum long-term environmental consequences. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2002-02-01T23:59:59.000Z

51

FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL  

DOE Green Energy (OSTI)

The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches while providing superior environmental protection. The overall objective is to manage landfill solid waste for rapid waste decomposition, maximum landfill gas generation and capture, and minimum long-term environmental consequences. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes of air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Construction is complete on the 3.5 acre anaerobic cell and liquid addition has commenced. Construction of the 2.5 acre aerobic cell is nearly complete with only the blower station and biofilter remaining. Waste placement and instrumentation installation is ongoing in the west-side 6-acre anaerobic cell. The current project status and preliminary monitoring results are summarized in this report.

Ramin Yazdani; Jeff Kieffer; Heather Akau

2002-04-01T23:59:59.000Z

52

Wind response of a tall building with full-scale observations  

SciTech Connect

A 22-story hotel is the subject of a full-scale experimental study conducted as the second phase of a project addressing the wind-induced response of tall buildings. The first phase of this study investigated a 16-story office building. The observations of wind loading and building response obtained at the hotel site reflect similar behavior as was observed at the office building. Consequently, the second phase serves to reinforce and generalize the findings of the phase one study. The results illustrate the significance of wind-induced response for buildings of intermediate height. Based on estimated thresholds of human perceptibility combined with predictions of maximum building response from a theoretical analysis, clearly perceptible wind-induced motion is expected to occur annually at the hotel. Yet, motion will not be sufficient intensity to be unpleasant. A similar analysis suggests that building response will also produce some non-structural damage on an annual basis. 3 refs., 5 figs., 2 tabs.

Mills, R.S. (California State Univ., Chico, CA (United States))

1991-08-01T23:59:59.000Z

53

Electrochromic windows for commercial buildings: Monitored results from a full-scale testbed  

SciTech Connect

Electrochromic glazings promise to be the next major advance in energy-efficient window technology, helping to transform windows and skylights from an energy liability to an energy source for the nation's building stock. Monitored results from a full-scale demonstration of large-area electrochromic windows are given. The test consisted of two side-by-side, 3.7x4.6-m, office-like rooms. In each room, five 62x173-cm lower electrochromic windows and five 62x43-cm upper electrochromic windows formed a large window wall. The window-to-exterior-wall ratio (WWR) was 0.40. The southeast-facing electrochromic windows had an overall visible transmittance (Tv) range of Tv=0.11-0.38 and were integrated with a dimmable electric lighting system to provide constant work plane illuminance and to control direct sun. Daily lighting use from the automated electrochromic window system decreased by 6 to 24% compared to energy use with static, low-transmission (Tv =0.11), unshaded windows in overcast to cle ar sky winter conditions in Oakland, California. Daily lighting energy use increased as much as 13% compared to lighting energy use with static windows that had Tv=0.38. Even when lighting energy savings were not obtainable, the visual environment produced by the electrochromic windows, indicated by well-controlled window and room luminance levels, was significantly improved for computer-type tasks throughout the day compared to the visual environment with unshaded 38%-glazing. Cooling loads were not measured, but previous building energy simulations indicate that additional savings could be achieved. To ensure visual and thermal comfort, electrochromics require occasional use of interior or exterior shading systems when direct sun is present. Other recommendations to improve electrochromic materials and controls are noted along with some architectural constraints.

Lee, Eleanor S.; DiBartolomeo, Dennis L.; Selkowitz, Stephen E.

2000-04-01T23:59:59.000Z

54

FULL-SCALE TESTING OF ENHANCED MERCURY CONTROL TECHNOLOGIES FOR WET FGD SYSTEMS  

SciTech Connect

Wet flue gas desulfurization (wet FGD) systems are currently installed on about 25% of the coal-fired utility generating capacity in the U.S., representing about 15% of the number of coal-fired units. Depending on the effect of operating parameters such as mercury content of the coal, form of mercury (elemental or oxidized) in the flue gas, scrubber spray tower configuration, liquid-to-gas ratio, and slurry chemistry, FGD systems can provide cost-effective, near-term mercury emissions control options with a proven history of commercial operation. For boilers already equipped with FGD systems, the incremental cost of any vapor phase mercury removal achieved is minimal. To be widely accepted and implemented, technical approaches that improve mercury removal performance for wet FGD systems should also have low incremental costs and have little or no impact on operation and SO{sub 2} removal performance. The ultimate goal of the Full-scale Testing of Enhanced Mercury Control for Wet FGD Systems Program was to commercialize methods for the control of mercury in coal-fired electric utility systems equipped with wet flue gas desulfurization (wet FGD). The program was funded by the U.S. Department of Energy's National Energy Technology Laboratory, the Ohio Coal Development Office within the Ohio Department of Development, and Babcock & Wilcox. Host sites and associated support were provided by Michigan South Central Power Agency (MSCPA) and Cinergy. Field-testing was completed at two commercial coal-fired utilities with wet FGD systems: (1) MSCPA's 55 MW{sub e} Endicott Station and (2) Cinergy's 1300 MW{sub e} Zimmer Station. Testing was conducted at these two locations because of the large differences in size and wet scrubber chemistry. Endicott employs a limestone, forced oxidation (LSFO) wet FGD system, whereas Zimmer uses Thiosorbic{reg_sign} Lime (magnesium enhanced lime) and ex situ oxidation. Both locations burn Ohio bituminous coal.

D.K. McDonald; G.T. Amrhein; G.A. Kudlac; D. Madden Yurchison

2003-05-07T23:59:59.000Z

55

Optimization of Preprocessing and Densification of Sorghum Stover at Full-scale Operation  

DOE Green Energy (OSTI)

Transportation costs can be a prohibitive step in bringing biomass to a preprocessing location or biofuel refinery. One alternative to transporting biomass in baled or loose format to a preprocessing location, is to utilize a mobile preprocessing system that can be relocated to various locations where biomass is stored, preprocess and densify the biomass, then ship it to the refinery as needed. The Idaho National Laboratory has a full scale 'Process Demonstration Unit' PDU which includes a stage 1 grinder, hammer mill, drier, pellet mill, and cooler with the associated conveyance system components. Testing at bench and pilot scale has been conducted to determine effects of moisture on preprocessing, crop varieties on preprocessing efficiency and product quality. The INLs PDU provides an opportunity to test the conclusions made at the bench and pilot scale on full industrial scale systems. Each component of the PDU is operated from a central operating station where data is collected to determine power consumption rates for each step in the process. The power for each electrical motor in the system is monitored from the control station to monitor for problems and determine optimal conditions for the system performance. The data can then be viewed to observe how changes in biomass input parameters (moisture and crop type for example), mechanical changes (screen size, biomass drying, pellet size, grinding speed, etc.,), or other variations effect the power consumption of the system. Sorgum in four foot round bales was tested in the system using a series of 6 different screen sizes including: 3/16 in., 1 in., 2 in., 3 in., 4 in., and 6 in. The effect on power consumption, product quality, and production rate were measured to determine optimal conditions.

Neal A. Yancey; Jaya Shankar Tumuluru; Craig C. Conner; Christopher T. Wright

2011-08-01T23:59:59.000Z

56

Full Scale Field Trial of the Low Temperature Mercury Capture Process  

Science Conference Proceedings (OSTI)

CONSOL Energy Inc., with partial funding from the Department of Energy (DOE) National Energy Technology Laboratory, designed a full-scale installation for a field trial of the Low-Temperature Mercury Control (LTMC) process, which has the ability to reduce mercury emissions from coal-fired power plants by over 90 percent, by cooling flue gas temperatures to approximately 230 °F and absorbing the mercury on the native carbon in the fly ash, as was recently demonstrated by CONSOL R&D on a slip-stream pilot plant at the Allegheny Energy Mitchell Station with partial support by DOE. LTMC has the potential to remove over 90 percent of the flue gas mercury at a cost at least an order of magnitude lower (on a $/lb mercury removed basis) than activated carbon injection. The technology is suitable for retrofitting to existing and new plants, and, although it is best suited to bituminous coal-fired plants, it may have some applicability to the full range of coal types. Installation plans were altered and moved from the original project host site, PPL Martins Creek plant, to a second host site at Allegheny Energyâ??s R. Paul Smith plant, before installation actually occurred at the Jamestown (New York) Board of Public Utilities (BPU) Samuel A. Carlson (Carlson) Municipal Generating Station Unit 12, where the LTMC system was operated on a limited basis. At Carlson, over 60% mercury removal was demonstrated by cooling the flue gas to 220-230 °F at the ESP inlet via humidification. The host unit ESP operation was unaffected by the humidification and performed satisfactorily at low temperature conditions.

James Locke; Richard Winschel

2011-09-30T23:59:59.000Z

57

Analysis of Soluble Re Concentrations in Refractory from Bulk Vitrification Full-Scale Test 38B  

SciTech Connect

The capacity of the waste treatment plant (WTP) being built at the Hanford Site is not sufficient to process all of the tank waste accumulated from more than 40 years of nuclear materials production. Bulk vitrification can accelerate tank waste treatment by providing some supplemental low-activity waste (LAW) treatment capacity. Bulk vitrification combines LAW and glass-forming chemicals in a large metal container and melts the contents using electrical resistance heating. A castable refractory block (CRB) is used along with sand to insulate the container from the heat generated while melting the contents into a glass waste form. This report describes engineering-scale (ES) and full-scale (FS) tests that have been conducted. Several ES tests showed that a small fraction of soluble Tc moves in the CRB and results in a groundwater peak different than WTP glass. The total soluble Tc-99 fraction in the FS CRB is expected to be different than that determined in the ES tests, but until FS test results are available, the best-estimate soluble Tc-99 fraction from the ES tests has been used as a conservative estimate. The first FS test results are from cold simulant tests that have been spiked with Re. An estimated scale-up factor extrapolates the Tc-99 data collected at the ES to the FS bulk vitrification waste package. Test FS-38A tested the refractory design and did not have a Re spike. Samples were taken and analyzed to help determine Re CRB background concentrations using a Re-spiked, six-tank composite simulant mixed with soil and glass formers to produce the waste feed. Although this feed is not physically the same as the Demonstration Bulk Vitrification System feed , the chemical make-up is the same. Extensive sampling of the CRB was planned, but difficulties with the test prevented completion of a full box. An abbreviated plan is described that looks at duplicate samples taken from refractory archive sections, a lower wall sample, and two base samples to gain early information about Re and projected Tc-99 levels in the FS box.

Cooley, Scott K.; Pierce, Eric M.; Bagaasen, Larry M.; Schweiger, Michael J.

2006-06-30T23:59:59.000Z

58

Determining the basic operational characteristics of a solar thermostat in the conditions of full-scale tests  

Science Conference Proceedings (OSTI)

A method of calculating a heat-receiver-heater and the volume of the heat store is presented, together with the results of full-scale tests of a solar thermostat with stochastic variations of climatic factors.

Gryadunov, A.I.; Mamedova, A.I.; Razaev, P.F.; Sadykov, S.A.; Velieva, B.A.

1984-01-01T23:59:59.000Z

59

Time scales of DNAPL migration in sandy aquifers examined via numerical simulation  

Science Conference Proceedings (OSTI)

The time required for dense nonaqueous phase liquid (DNAPL) to cease migrating following release to the subsurface is a valuable component of a site conceptual model. This study uses numerical simulation to investigate the migration of six different DNAPLs in sandy aquifers. The most influential parameters governing migration cessation time are the density and viscosity of the DNAPL and the mean hydraulic conductivity of the aquifer. Releases of between 1 and 40 drums of chlorinated solvent DNAPLs, characterized by relatively high density and low viscosity, require on the order of months to a few years to cease migrating in a heterogeneous medium sand aquifer having an average hydraulic conductivity of 7.4 x 10{sup -3} cm/s. In contrast to this, the release of 20 drums of coal tar {rho}{sub D} = 1061 kg/m{sup 3}, {mu}{sub D} = 0.161 Pa(.)s) requires more than 100 years to cease migrating in the same aquifer. Altering the mean hydraulic conductivity of the aquifer results in a proportional change in cessation times. Parameters that exhibit relatively little influence on migration time scales are the DNAPL-water interfacial tension, release volume, source capillary pressure, mean aquifer porosity, and ambient ground water hydraulic gradient. This study also demonstrates that low-density DNAPLs (e.g., coal tar) give rise to greater amounts of lateral spreading and greater amounts of pooling on capillary barriers than high-density DNAPLs such as trichloroethylene or tetrachloroethylene.

Gerhard, J.I.; Pang, T.; Kueper, B.H. [University of Edinburgh, Edinburgh (United Kingdom). Inst. of Infrastructure & Environmental

2007-03-15T23:59:59.000Z

60

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet Flue Gas Desulfurization System  

Science Conference Proceedings (OSTI)

The objective of this project was to demonstrate at full scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury (Hg0) in flue gas from coal combustion. The project was conducted from July 24, 2006 through June 30, 2010. It was conducted with cofunding from the U.S. Department of Energy's National Energy Technology Laboratory as part of Cooperative Agreement DE-FC26-06NT42778, "Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System." Private secto...

2010-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 3 Full-scale Test Results  

SciTech Connect

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of a flue gas desulfurization (FGD) additive, Degussa Corporation's TMT-15, to prevent the reemission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine TMT salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the TMT-15 additive in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} reemissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Power River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, TXU Generation Company LP, Southern Company, and Degussa Corporation. TXU Generation has provided the Texas lignite/PRB cofired test site for pilot FGD tests, Monticello Steam Electric Station Unit 3. Southern Company is providing the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems to be tested. IPL, an AES company, provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Degussa Corporation is providing the TMT-15 additive and technical support to the test program as cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests were completed in 2005 and have been previously reported. This topical report presents the results from the Task 3 full-scale additive tests, conducted at IPL's Petersburg Station Unit 2. The Task 5 full-scale additive tests will be conducted later in calendar year 2007.

Gary Blythe

2007-05-01T23:59:59.000Z

62

Numerical and experimental behaviour of a full-scale RC structure upgraded with steel and aluminium shear panels  

Science Conference Proceedings (OSTI)

In current paper the problem of seismic upgrading of existing reinforced concrete structures by means of metal shear panels is examined. Firstly, according to both a preliminarily experimental-numerical evaluation of the bare RC structure performance ... Keywords: FEM models, Full-scale tests, Metal shear panels, Performance based design, RC buildings, Seismic retrofitting

A. Formisano; G. De Matteis; F. M. Mazzolani

2010-12-01T23:59:59.000Z

63

Wind Scanner: A full-scale Laser Facility for Wind and Turbulence Measurements around large Wind Turbines  

E-Print Network (OSTI)

Wind Scanner: A full-scale Laser Facility for Wind and Turbulence Measurements around large Wind Turbines Torben Mikkelsen, Jakob Mann and Michael Courtney Wind Energy Department, Risø National Laboratory:Torben.Mikkelsen@Risoe.dk Summary RIS� DTU has started to build a newly designed laser-based lidar scanning facility for remote wind

64

Design and performance of a full-scale spray calciner for nonradioactive high-level-waste-vitrification studies  

SciTech Connect

In the spray calcination process, liquid waste is spray-dried in a heated-wall spray dryer (termed a spray calciner), and then it may be combined in solid form with a glass-forming frit. This mixture is then melted in a continuous ceramic melter or in an in-can melter. Several sizes of spray calciners have been tested at PNL- laboratory scale, pilot scale and full scale. Summarized here is the experience gained during the operation of PNL's full-scale spray calciner, which has solidified approx. 38,000 L of simulated acid wastes and approx. 352,000 L of simulated neutralized wastes in 1830 h of processing time. Operating principles, operating experience, design aspects, and system descriptions of a full-scale spray calciner are discussed. Individual test run summaries are given in Appendix A. Appendices B and C are studies made by Bechtel Inc., under contract by PNL. These studies concern, respectively, feed systems for the spray calciner process and a spray calciner vibration analysis. Appendix D is a detailed structural analysis made at PNL of the spray calciner. These appendices are included in the report to provide a complete description of the spray calciner and to include all major studies made concerning PNL's full-scale spray calciner.

Miller, F.A.

1981-06-01T23:59:59.000Z

65

Technical and Economic Evaluation of Coal Tar Dense Non-Aqueous Phase Liquid (DNAPL) Pumping Techniques  

Science Conference Proceedings (OSTI)

The utility industry has become aware of potential environmental issues at some sites resulting from process residues or byproducts at former manufactured gas plant (MGP) sites. One of the greatest challenges utility managers face in the management of these sites is the subsurface presence of coal tar, dense-non aqueous phase liquid (DNAPL). This report, which explores the technical feasibility and life cycle costs for several coal tar DNAPL pumping alternatives, is intended to assist utilities in evalua...

2000-03-07T23:59:59.000Z

66

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results  

SciTech Connect

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests and the full-scale test using high-sulfur coal were completed in 2005 and 2006 and have been previously reported. This topical report presents the results from the Task 5 full-scale additive tests, conducted at Southern Company's Plant Yates Unit 1. Both additives were tested there.

Gary Blythe; MariJon Owens

2007-12-01T23:59:59.000Z

67

Ultrasonic properties of granular media saturated with dnapl/watermixtures  

SciTech Connect

We present the results of four experiments investigating the ultrasonic properties of granular materials partially saturated with trichloroethylene (TCE), a dense non-aqueous contaminant. P-wave velocity measurements were made under in situ effective stress conditions using a pulse transmission cell at ?250 kHz. Two synthetic samples and two natural aquifer cores were fully saturated with water and then subjected to an axial injection of TCE. The resulting measurements show reductions in P-wave velocity of up to 15% due to contaminant saturation. A theoretical model combining Gassmann fluid substitution and Hill's equation was used to estimate the effects of DNAPL saturation; this model underpredicted observed reductions in velocity at high TCE saturations. A linear relationship, expressed in terms of volumetric contaminant fraction, provided an excellent empirical fit to the laboratory measurements.

Ajo-Franklin, J.B.; Geller, J.T.; Harris, J.M.

2007-09-15T23:59:59.000Z

68

Empirical assessment of a prismatic daylight-redirecting window film in a full-scale office testbed  

NLE Websites -- All DOE Office Websites (Extended Search)

for presentation to the IESNA 2013 Annual Conference, Huntington Beach, CA, for presentation to the IESNA 2013 Annual Conference, Huntington Beach, CA, October 26-29, 2013 and for publication in Leukos, the journal of the IESNA. Empirical assessment of a prismatic daylight- redirecting window film in a full-scale office testbed Anothai Thanachareonkit, Eleanor S. Lee, Andrew McNeil Building Technologies and Urban Systems Department, Environmental Energy Technologies Division, Lawrence Berkeley National Laboratory, Mailstop 90-3111, 1 Cyclotron Road, Berkeley, CA 94720 USA Abstract Daylight redirecting systems with vertical windows have the potential to offset lighting energy use in deep perimeter zones. Microstructured prismatic window films can be manufactured using low-cost, roll-to-roll fabrication methods and adhered to the inside surface of existing

69

Report on the design and operation of a full-scale anaerobic dairy manure digester. Final report  

DOE Green Energy (OSTI)

A full-scale anaerobic digester on the Monroe State Dairy Farm was operated and monitored for 24 months with funding provided by the United States Department of Energy, Fuels from Biomass Systems Branch. During the period of operation, operating parameters were varied and the impact of those changes is described. Operational experiences and system component performance are discussed. Internal digester mixing equipment was found to be unnecessary, and data supporting this conclusion are given. An influent/effluent heat exchanger was installed and tested, and results of the tests are included. Recommendations for digester design and operation are presented. Biological stability was monitored, and test results are given. Gas production rates and system net energy are analyzed. The economics of anaerobic digestion are evaluated based on various financing options, design scales, and expected benefits. Under many circumstances digesters are feasible today, and a means of analysis is given.

Coppinger, E.; Brautigam, J.; Lenart, J.; Baylon, D.

1979-12-01T23:59:59.000Z

70

Thermal and Daylighting Performance of an automated venetian blind and lighting system in a full scale private office  

E-Print Network (OSTI)

Dynamic envelope/lighting systems have the potential to optimize the perimeter zone energy balance between daylight admission and solar heat gain rejection on a real-time basis, and to increase occupant comfort. Two side-by-side full-scale offices in Oakland, California were built to further develop and test this concept. An automated venetian blind was operated in synchronization with a dimmable electric lighting system to block direct sun, provide the design workplane illuminance, and maximize view. The research program encompassed system design refinements, energy measurements, and human factors tests. In this study, we present lighting energy and cooling load data that were monitored in this facility over the course of a year. Significant energy savings and peak demand reductions were attained with the automated venetian blind / lighting system compared to a static venetian blind with the same dimmable electric lighting system. Correlations between key weather parameters and

E. S. Lee; D. L. Dibartolomeo; S. E. Selkowitz; E. S. Lee; D. L. Dibartolomeo; S. E. Selkowitz

1998-01-01T23:59:59.000Z

71

Permanganate Treatment of DNAPLs in Reactive Barriers and Source Zone Flooding Schemes - Final Report  

SciTech Connect

This study provides a detailed process-level understanding of the oxidative destruction of the organic contaminant emphasizing on reaction pathways and kinetics. A remarkable rise in the MnO{sup {minus}} consumption rate with TCA and PCE mixtures proves that the phase transfer catalysts have the ability to increase oxidation rate of DNAPLs either in pure phase or mixtures and that there is significant potential for testing the catalyzed scheme under field conditions. Secondly, as an attempt to enhance the oxidation of DNAPL, we are trying to exploit cosolvency effects, utilizing various alcohol-water mixtures to increase DNAPL solubilization. Preliminary results of cosolvency experiments indicate the enhancement in the transfer of nonaqueous phase TCE to TBA-water solution and the rate of TCE degradation in aqueous phase.

Schwartz, F.W.

2000-10-01T23:59:59.000Z

72

FULL-SCALE, WIND TUNNEL AND CFD WIND ENGINEERING STUDIES A variety of methods can be used to obtain wind engineering design information. These include  

E-Print Network (OSTI)

FULL-SCALE, WIND TUNNEL AND CFD WIND ENGINEERING STUDIES A variety of methods can be used to obtain wind engineering design information. These include codes of practice, full-scale, wind tunnel are listed in the table below: Table 1. Relative advantages and disadvantages of wind engineering techniques

Savory, Eric

73

FULL SCALE TESTING TECHNOLOGY MATURATION OF A THIN FILM EVAPORATOR FOR HIGH-LEVEL LIQUID WASTE MANAGEMENT AT HANFORD - 12125  

SciTech Connect

Simulant testing of a full-scale thin-film evaporator system was conducted in 2011 for technology development at the Hanford tank farms. Test results met objectives of water removal rate, effluent quality, and operational evaluation. Dilute tank waste simulant, representing a typical double-shell tank supernatant liquid layer, was concentrated from a 1.1 specific gravity to approximately 1.5 using a 4.6 m{sup 2} (50 ft{sup 2}) heated transfer area Rototherm{reg_sign} evaporator from Artisan Industries. The condensed evaporator vapor stream was collected and sampled validating efficient separation of the water. An overall decontamination factor of 1.2E+06 was achieved demonstrating excellent retention of key radioactive species within the concentrated liquid stream. The evaporator system was supported by a modular steam supply, chiller, and control computer systems which would be typically implemented at the tank farms. Operation of these support systems demonstrated successful integration while identifying areas for efficiency improvement. Overall testing effort increased the maturation of this technology to support final deployment design and continued project implementation.

TEDESCHI AR; CORBETT JE; WILSON RA; LARKIN J

2012-01-26T23:59:59.000Z

74

Manufacturing Cost Analysis for YSZ-Based FlexCells at Pilot and Full Scale Production Scales  

SciTech Connect

Significant reductions in cell costs must be achieved in order to realize the full commercial potential of megawatt-scale SOFC power systems. The FlexCell designed by NexTech Materials is a scalable SOFC technology that offers particular advantages over competitive technologies. In this updated topical report, NexTech analyzes its FlexCell design and fabrication process to establish manufacturing costs at both pilot scale (10 MW/year) and full-scale (250 MW/year) production levels and benchmarks this against estimated anode supported cell costs at the 250 MW scale. This analysis will show that even with conservative assumptions for yield, materials usage, and cell power density, a cost of $35 per kilowatt can be achieved at high volume. Through advancements in cell size and membrane thickness, NexTech has identified paths for achieving cell manufacturing costs as low as $27 per kilowatt for its FlexCell technology. Also in this report, NexTech analyzes the impact of raw material costs on cell cost, showing the significant increases that result if target raw material costs cannot be achieved at this volume.

Scott Swartz; Lora Thrun; Robin Kimbrell; Kellie Chenault

2011-05-01T23:59:59.000Z

75

PILOT-AND FULL-SCALE DEMONSTRATION OF ADVANCED MERCURY CONTROL TECHNOLOGIES FOR LIGNITE-FIRED POWER PLANTS  

SciTech Connect

The overall objective of the project was to develop advanced innovative mercury control technologies to reduce mercury emissions by 50%-90% in flue gases typically found in North Dakota lignite-fired power plants at costs from one-half to three-quarters of current estimated costs. Power plants firing North Dakota lignite produce flue gases that contain >85% elemental mercury, which is difficult to collect. The specific objectives were focused on determining the feasibility of the following technologies: Hg oxidation for increased Hg capture in dry scrubbers, incorporation of additives and technologies that enhance Hg sorbent effectiveness in electrostatic precipitators (ESPs) and baghouses, the use of amended silicates in lignite-derived flue gases for Hg capture, and the use of Hg adsorbents within a baghouse. The approach to developing Hg control technologies for North Dakota lignites involved examining the feasibility of the following technologies: Hg capture upstream of an ESP using sorbent enhancement, Hg oxidation and control using dry scrubbers, enhanced oxidation at a full-scale power plant using tire-derived fuel and oxidizing catalysts, and testing of Hg control technologies in the Advanced Hybrid{trademark} filter.

Steven A. Benson; Charlene R. Crocker; Kevin C. Galbreath; Jay R. Gunderson; Michael J. Holmes; Jason D. Laumb; Jill M. Mackenzie; Michelle R. Olderbak; John H. Pavlish; Li Yan; Ye Zhuang

2005-02-01T23:59:59.000Z

76

Fundamental Research on Percussion Drilling: Improved rock mechanics analysis, advanced simulation technology, and full-scale laboratory investigations  

Science Conference Proceedings (OSTI)

This report summarizes the research efforts on the DOE supported research project Percussion Drilling (DE-FC26-03NT41999), which is to significantly advance the fundamental understandings of the physical mechanisms involved in combined percussion and rotary drilling, and thereby facilitate more efficient and lower cost drilling and exploration of hard-rock reservoirs. The project has been divided into multiple tasks: literature reviews, analytical and numerical modeling, full scale laboratory testing and model validation, and final report delivery. Literature reviews document the history, pros and cons, and rock failure physics of percussion drilling in oil and gas industries. Based on the current understandings, a conceptual drilling model is proposed for modeling efforts. Both analytical and numerical approaches are deployed to investigate drilling processes such as drillbit penetration with compression, rotation and percussion, rock response with stress propagation, damage accumulation and failure, and debris transportation inside the annulus after disintegrated from rock. For rock mechanics modeling, a dynamic numerical tool has been developed to describe rock damage and failure, including rock crushing by compressive bit load, rock fracturing by both shearing and tensile forces, and rock weakening by repetitive compression-tension loading. Besides multiple failure criteria, the tool also includes a damping algorithm to dissipate oscillation energy and a fatigue/damage algorithm to update rock properties during each impact. From the model, Rate of Penetration (ROP) and rock failure history can be estimated. For cuttings transport in annulus, a 3D numerical particle flowing model has been developed with aid of analytical approaches. The tool can simulate cuttings movement at particle scale under laminar or turbulent fluid flow conditions and evaluate the efficiency of cutting removal. To calibrate the modeling efforts, a series of full-scale fluid hammer drilling tests, as well as single impact tests, have been designed and executed. Both Berea sandstone and Mancos shale samples are used. In single impact tests, three impacts are sequentially loaded at the same rock location to investigate rock response to repetitive loadings. The crater depth and width are measured as well as the displacement and force in the rod and the force in the rock. Various pressure differences across the rock-indentor interface (i.e. bore pressure minus pore pressure) are used to investigate the pressure effect on rock penetration. For hammer drilling tests, an industrial fluid hammer is used to drill under both underbalanced and overbalanced conditions. Besides calibrating the modeling tool, the data and cuttings collected from the tests indicate several other important applications. For example, different rock penetrations during single impact tests may reveal why a fluid hammer behaves differently with diverse rock types and under various pressure conditions at the hole bottom. On the other hand, the shape of the cuttings from fluid hammer tests, comparing to those from traditional rotary drilling methods, may help to identify the dominant failure mechanism that percussion drilling relies on. If so, encouraging such a failure mechanism may improve hammer performance. The project is summarized in this report. Instead of compiling the information contained in the previous quarterly or other technical reports, this report focuses on the descriptions of tasks, findings, and conclusions, as well as the efforts on promoting percussion drilling technologies to industries including site visits, presentations, and publications. As a part of the final deliveries, the 3D numerical model for rock mechanics is also attached.

Michael S. Bruno

2005-12-31T23:59:59.000Z

77

Full-scale demonstration of low-NO{sub x} cell{trademark} burner retrofit. Final report  

Science Conference Proceedings (OSTI)

The objective of the Low-NO{sub x} Cell{trademark}Burner (LNCB{trademark}) demonstration is to evaluate the applicability of this technology for reducing NO{sub x} emissions in full-scale, cell burner-equipped boilers. More precisely, the program objectives are to: (1) Achieve at least a 50% reduction in NO{sub x} emissions. (2) Reduce NO{sub x} with no degradation to boiler performance or life of the unit. (3) Demonstrate a technically and economically feasible retrofit technology. Cell burner equipped boilers comprise 13% of the Pre-New Source Performance Standards (NSPS) coal-fired generating capacity. This relates to 34 operating units generating 23,639 MWe, 29 of which are opposed wall fired with two rows of two-nozzle cell burners on each wall. The host site was one of these 29. Dayton Power & Light offered use of J.M. Stuart Station`s Unit No. 4 as the host site. It was equipped with 24, two-nozzle cell burners arranged in an opposed wall configuration. To reduce NO{sub x} emissions, the LNCB{trademark} has been designed to delay the mixing of the fuel and combustion air. The delayed mixing, or staged combustion, reduces the high temperatures normally generated in the flame of a standard cell burner. A key design criterion for the burner was accomplishing delayed fuel-air mixing with no pressure part modifications to facilitate a {open_quotes}plug-in{close_quotes} design. The plug-in design reduces material costs and outage time required to complete the retrofit, compared to installing conventional, internally staged low-NO{sub x} burners.

Eckhart, C.F.; Kitto, J.B.; Kleisley, R.J. [and others

1994-07-01T23:59:59.000Z

78

Comparison of the leading candidate combinations of blanket materials, thermodynamic cycles, and tritium systems for full scale fusion power plants  

SciTech Connect

The many possible combinations of blanket materials, tritium generation and recovery systems, and power conversion systems were surveyed and a comprehensive set of designs were generated by using a common set of ground rules that include all of the boundary conditions that could be envisioned for a full- scale commercial fusion power plant. Particular attention was given to the effects of blanket temperature on power plant cycle efficiency and economics, the interdependence of the thermodynamic cycle and the tritium recovery system, and to thermal and pressure stresses in the blanket structure. The results indicate that, of the wide variety of systems that have been considered, the most promising employs lithium recirculated in a closed loop within a niobium blanket structure and cooled with boiling potassium or cesium. This approach gives the simplest and lowest cost tritium recovery system, the lowest pressure and thermal stresses, the simplest structure with the lowest probability of a leak, the greatest resistance to damage from a plasma energy dump, and the lowest rate of plasma contamination by either outgassing or sputtering. The only other blanket materials combination that appears fairly likely to give a satisfactory tritium generation and recovery system is a lithium-beryllium fluoride-Incoloy blanket, and even this system involves major uncertainties in the effectiveness, size, and cost of the tritium recovery system. Further, the Li$sub 2$BeF$sub 4$ blanket system has the disadvantage that the world reserves of beryllium are too limited to support a full-blown fusion reactor economy, its poor thermal conductivity leads to cooling difficulties and a requirement for a complex structure with intricate cooling passages, and this inherently leads to an expansive blanket with a relatively high probability of leaks. The other blanket materials combinations yield even less attractive systems. (auth)

Fraas, A.P.

1975-01-01T23:59:59.000Z

79

A screening model for simulating DNAPL flow and transport in porous media: theoretical development  

Science Conference Proceedings (OSTI)

In the last two decades there has been an increased awareness of the contamination of groundwater due to the presence of denser-than-water nonaqueous phase liquids (DNAPLs). Numerous theoretical, experimental and numerical investigations have been conducted ... Keywords: Contaminant transport, Multiphase flow, Screening model

Clinton S. Willson; James W. Weaver; Randall J. Charbeneau

2006-01-01T23:59:59.000Z

80

A life cycle approach to the management of household food waste - A Swedish full-scale case study  

Science Conference Proceedings (OSTI)

Research Highlights: > The comparison of three different methods for management of household food waste show that anaerobic digestion provides greater environmental benefits in relation to global warming potential, acidification and ozone depilation compared to incineration and composting of food waste. Use of produced biogas as car fuel provides larger environmental benefits compared to a use of biogas for heat and power production. > The use of produced digestate from the anaerobic digestion as substitution for chemical fertilizer on farmland provides avoidance of environmental burdens in the same ratio as the substitution of fossil fuels with produced biogas. > Sensitivity analyses show that results are highly sensitive to assumptions regarding the environmental burdens connected to heat and energy supposedly substituted by the waste treatment. - Abstract: Environmental impacts from incineration, decentralised composting and centralised anaerobic digestion of solid organic household waste are compared using the EASEWASTE LCA-tool. The comparison is based on a full scale case study in southern Sweden and used input-data related to aspects such as source-separation behaviour, transport distances, etc. are site-specific. Results show that biological treatment methods - both anaerobic and aerobic, result in net avoidance of GHG-emissions, but give a larger contribution both to nutrient enrichment and acidification when compared to incineration. Results are to a high degree dependent on energy substitution and emissions during biological processes. It was seen that if it is assumed that produced biogas substitute electricity based on Danish coal power, this is preferable before use of biogas as car fuel. Use of biogas for Danish electricity substitution was also determined to be more beneficial compared to incineration of organic household waste. This is a result mainly of the use of plastic bags in the incineration alternative (compared to paper bags in the anaerobic) and the use of biofertiliser (digestate) from anaerobic treatment as substitution of chemical fertilisers used in an incineration alternative. Net impact related to GWP from the management chain varies from a contribution of 2.6 kg CO{sub 2}-eq/household and year if incineration is utilised, to an avoidance of 5.6 kg CO{sub 2}-eq/household and year if choosing anaerobic digestion and using produced biogas as car fuel. Impacts are often dependent on processes allocated far from the control of local decision-makers, indicating the importance of a holistic approach and extended collaboration between agents in the waste management chain.

Bernstad, A., E-mail: anna.bernstad@chemeng.lth.se [Department of Chemical Engineering, Box 124, Faculty of Engineering (LTH), Lund University, S-221 00 Lund (Sweden); Cour Jansen, J. la [Department of Chemical Engineering, Box 124, Faculty of Engineering (LTH), Lund University, S-221 00 Lund (Sweden)

2011-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Contaminant plumes containment and remediation focus area. Technology summary  

Science Conference Proceedings (OSTI)

EM has established a new approach to managing environmental technology research and development in critical areas of interest to DOE. The Contaminant Plumes Containment and Remediation (Plumes) Focus Area is one of five areas targeted to implement the new approach, actively involving representatives from basic research, technology implementation, and regulatory communities in setting objectives and evaluating results. This document presents an overview of current EM activities within the Plumes Focus Area to describe to the appropriate organizations the current thrust of the program and developing input for its future direction. The Plumes Focus Area is developing remediation technologies that address environmental problems associated with certain priority contaminants found at DOE sites, including radionuclides, heavy metals, and dense non-aqueous phase liquids (DNAPLs). Technologies for cleaning up contaminants of concern to both DOE and other federal agencies, such as volatile organic compounds (VOCs), polychlorinated biphenyls (PCBs), and other organics and inorganic compounds, will be developed by leveraging resources in cooperation with industry and interagency programs.

NONE

1995-06-01T23:59:59.000Z

82

Pinellas Remediation Agreement Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pinellas Pinellas Agreement Name Remediation Agreement for the Four and One-Half Acre Site in Largo, Pinellas County, Florida State Florida Agreement Type Remediation Agreement Legal Driver(s) CERCLA/ Atomic Energy Act of 1954, as amended/ Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former Pinellas Plant Parties DOE; Florida Department of Environmental Protection Date 3/12/2001 SCOPE * Remediate the groundwater under a parcel of property adjacent to DOE's former Pinellas Plant to levels consistent with industrial use. * Complete remedial actions at the site in accordance with a Remedial Action Plan prepared by DOE and approved by FDEP. * Submit quarterly reports of interim remedial actions at the Site.

83

Savannah River Remediation Procurement  

NLE Websites -- All DOE Office Websites (Extended Search)

and procedures, rules and regulations, terms and conditions and the orders and directives under which Savannah River Remediation LLC (SRR) develops, issues, administers and...

84

FULL-SCALE FLAMMABILITY MEASURES  

Science Conference Proceedings (OSTI)

... on the well established oxygen consumption principle [16 ... The energy contribution due to the formation of ... the floor and damaging the load cell and ...

2005-04-29T23:59:59.000Z

85

Preliminary Study of a Vented Attic Radiant Barrier System in Hot, Humid Climates Using Side-by-Side, Full-Scale Test Houses  

E-Print Network (OSTI)

A series of side-by-side tests was performed using two full scale test houses to determine the effectiveness of a Vented Radiant Barrier System (VRBS) in reducing the ceiling heat flux during the summer cooling season in North Florida. Another series of side-by-side tests was conducted to evaluate the effect of a VRBS on ceiling heat losses under typical North Florida winter conditions. The effect of a VRBS on the expected life of roof shingles was also evaluated.

Lear, W. E.; Barrup, T. E.; Davis, K. E.

1987-01-01T23:59:59.000Z

86

Continuation of full-scale three-dimensional numerical experiments on high-intensity particle and laser beam-matter interactions  

SciTech Connect

We present results from the grant entitled, ���¢��������Continuation of full-scale three-dimensional numerical experiments on high-intensity particle and laser beam-matter interactions.���¢������� The research significantly advanced the understanding of basic high-energy density science (HEDS) on ultra intense laser and particle beam plasma interactions. This advancement in understanding was then used to to aid in the quest to make 1 GeV to 500 GeV plasma based accelerator stages. The work blended basic research with three-dimensions fully nonlinear and fully kinetic simulations including full-scale modeling of ongoing or planned experiments. The primary tool was three-dimensional particle-in-cell simulations. The simulations provided a test bed for theoretical ideas and models as well as a method to guide experiments. The research also included careful benchmarking of codes against experiment. High-fidelity full-scale modeling provided a means to extrapolate parameters into regimes that were not accessible to current or near term experiments, thereby allowing concepts to be tested with confidence before tens to hundreds of millions of dollars were spent building facilities. The research allowed the development of a hierarchy of PIC codes and diagnostics that is one of the most advanced in the world.

Mori, Warren, B.

2012-12-01T23:59:59.000Z

87

Material Property Estimation for Direct Detection of DNAPL using Integrated Ground-Penetrating Radar Velocity, Imaging and Attribute Analysis  

SciTech Connect

The focus of this project is direct detection of DNAPL's specifically chlorinated solvents, via material property estimation from multi-fold surface ground-penetrating radar (GPR) data. We combine state-of-the-art GPR processing methodology with quantitative attribute analysis and material property estimation to determine the location and extent of residual and/or pooled DNAPL in both the vadose and saturated zones. An important byproduct of our research is state-of-the-art imaging which allows us to pinpoint attribute anomalies, characterize stratigraphy, identify fracture zones, and locate buried objects.

John H. Bradford; Stephen Holbrook; Scott B. Smithson

2004-12-09T23:59:59.000Z

88

Material Property Estimation for Direct Detection of DNAPL using Integrated Ground-Penetrating Radar Velocity, Imaging and Attribute Analysis  

SciTech Connect

The focus of this project is direct detection of DNAPL's specifically chlorinated solvents, via material property estimation from multi-fold surface ground-penetrating radar (GPR) data. We combine state-of-the-art GPR processing methodology with quantitative attribute analysis and material property estimation to determine the location and extent of residual and/or pooled DNAPL in both the vadose and saturated zones. An important byproduct of our research is state-of-the-art imaging which allows us to pinpoint attribute anomalies, characterize stratigraphy, identify fracture zones, and locate buried objects.

John H. Bradford; Stephen Holbrook; Scott B. Smithson

2004-12-09T23:59:59.000Z

89

Savannah River Remediation SRR Savannah River Remediation SRR  

NLE Websites -- All DOE Office Websites (Extended Search)

- Hanford Paducah Remediation Services Bechtel Jacobs - ETTP DOE-EM Average without Construction WRPS - TOC Hanford Mission Support Alliance - RL Bechtel National Remediation...

90

Summary - Building C-400 Thermal Treatment Remedial Design Report and Investigation, Paducah, Kentucky  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paducah, KY Paducah, KY EM Project: Building C400 Thermal Treatment ETR Report Date: August 2007 ETR-8 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation, Paducah Kentucky Why DOE-EM Did This Review The groundwater underlying the Paducah Gaseous Diffusion Plant (PGDP) is contaminated by chlorinated solvents, principally trichloroethylene (TCE), as well as other contaminants. TCE was released as a dense nonaqueous phase liquid (DNAPL) to the subsurface soils and groundwater as a result of operations that began in 1952. The Building C-400 area is coincident with the highest TCE concentrations in the groundwater plumes at PGDP. Based on all characterization data

91

Full-scale demonstration Low-NO{sub x} Cell{trademark} Burner retrofit. Quarterly report No. 8, 1 July, 1992--30 September, 1992: Revision 1  

SciTech Connect

The Full Scale Demonstration Low-NO{sub x} Cell{trademark} Burner (LNCB{trademark}) project involves retrofitting the two-nozzle cell burners at Dayton Power and Light`s, 605 MW(e) J.M. Stuart Unit No. 4 boiler near Aberdeen, Ohio with LNCB{trademark} (a burner and integral No{sub x} port). Previous pilot-scale tests have shown such an arrangement to achieve 50% reduction in NO{sub x} emission levels. This full-scale project will determine the commercial applicability of this technology. Long-term testing via a Continuous Emission Monitor (CEM) began in August, 1992. CEM testing will continue until Spring of 1993 when Unit No. 4 comes off line for its annual outage which at this time is scheduled for April 4, 1993. A key item remaining to be evaluated as part of the long term testing is furnace tube wall corrosion. H{sub 2}S probing similar to optimized test probing was repeated during the week of August 17, 1992. During the Spring `93 outage, ultrasonic testing of the furnace wall tubes as well as destructive examination of samples from the corrosion test panel will be accomplished.

Not Available

1993-10-25T23:59:59.000Z

92

Material Property Estimation for Direct Detections of DNAPL using Integrated Ground-Penetrating Radar Velocity, Imaging and Attribute Analysis  

DOE Green Energy (OSTI)

The focus of our work is direct detection of DNAPLs, specifically chlorinated solvents, via material property estimation from surface ground-penetrating radar (GPR) data. We combine sophisticated GPR processing methodology with quantitative attribute analysis and material property estimation to determine the location and extent of residual and/or pooled DNAPL in both the vadose and saturated zones. An important byproduct of our research is state-of-the-art imaging which allows us to pinpoint attribute anomalies, characterize stratigraphy, identify fracture zones, and locate buried objects. Implementation and verification of these methodologies will be a significant advance in GPR research and in meeting DOE's need for reliable in-situ characterization of DNAPL contamination. Chlorinated solvents have much lower electric permittivity and conductivity than water. An electrical property contrast is induced when solvents displace water in the sediment column resulting in an anomalous GPR signature. To directly identify zones of DNAPL contamination, we focus on three aspects of reflected wave behavior--propagation velocity, frequency dependent attenuation, and amplitude variation with offset (AVO). Velocity analysis provides a direct estimate of electric permittivity, attenuation analysis provides a measure of conductivity, and AVO behavior is used to estimate the permittivity ratio at a reflecting boundary. Areas of anomalously low electric permittivity and conductivity are identified as potential DNAPL rich zones. Preliminary work illustrated significant potential for quantitative direct detection methodologies in identifying shallow DNAPL source zones. It is now necessary to verify these methodologies in a field setting. To this end, the project is field oriented and has three primary objectives: (1) Develop a suite of methodologies for direct detection of DNAPLs from surface GPR data (2) Controlled field verification at well characterized, contaminated sites (3) Exploratory contaminant detection in a field setting to be verified through direct sampling Field experiments are being conducted at the Savannah River and Hanford sites, at five DOD sites (Dover AFB, DE; McClellan AFB, CA; Port Hueneme, CA; Wurtsmith AFB, MI; Hill AFB, UT), at a former refinery site near Cincinnati, Ohio, and at a creosote wood preserving site in Fayetville, NC.

Bradford, John; Smithson, Scott B.; Holbrook, W. Stephen

2004-06-14T23:59:59.000Z

93

Expedited approach to a carbon tetrachloride spill interim remedial action  

Science Conference Proceedings (OSTI)

Monitored natural attenuation was selected as an interim measure for a carbon tetrachloride spill site where source removal or in situ treatment cannot currently be implemented due to the surrounding infrastructure. Rather than delay action until the site is more accessible to an interim action, this more expedited approach would support a final action. Individual Hazard Substance Site (IHSS) 118.1 is a former underground storage tank at Rocky Flats Environmental Technology Site (RFETS) that stored carbon tetrachloride for process use. Inadvertent releases associated with filling and failure of the tank system resulted in an accumulation of carbon tetrachloride in a bedrock depression around a group of former process waste tanks. Access to the source of contamination is obstructed by numerous utilities, the process waste tanks, and other components of the site infrastructure that limit the ability to conduct an effective remedial action. A preremedial field investigation was conducted in September 1997 to identify and delineate the extent of the dense nonaqueous phase liquid (DNAPL) in the subsurface. Data collected from the investigation revealed that natural processes might be limiting the migration of contaminants from the source area.

Cowdery, C.; Primrose, A. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Uhland, J. [Kaiser-Hill, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

94

Source Remediation vs. Plume  

E-Print Network (OSTI)

This summary paper reviews just some of the extensive scientific literature from the past 20 years on the various aspects of contaminant source remediation and plume management. Some of the major findings of the numerous research projects are presented.

Management Critical Factors; G. Teutsch; H. Rgner; D. Zamfirescu; M. Finkel; M. Bittens

2001-01-01T23:59:59.000Z

95

Attenuation Based Remedies  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Attenuation Based Remedies in the Subsurface Applied Field Research Initiative is to seek holistic solutions to DOE’s groundwater contamination problems that consider not only...

96

Engineering Study for a Full Scale Demonstration of Steam Reforming Black Liquor Gasification at Georgia-Pacific's Mill in Big Island, Virginia  

SciTech Connect

Georgia-Pacific Corporation performed an engineering study to determine the feasibility of installing a full-scale demonstration project of steam reforming black liquor chemical recovery at Georgia-Pacific's mill in Big Island, Virginia. The technology considered was the Pulse Enhanced Steam Reforming technology that was developed and patented by Manufacturing and Technology Conversion, International (MTCI) and is currently licensed to StoneChem, Inc., for use in North America. Pilot studies of steam reforming have been carried out on a 25-ton per day reformer at Inland Container's Ontario, California mill and on a 50-ton per day unit at Weyerhaeuser's New Bern, North Carolina mill.

Robert De Carrera; Mike Ohl

2002-03-19T23:59:59.000Z

97

Full-scale demonstration Low-NO{sub x} Cell{trademark} Burner retrofit. Quarterly report No. 4, July 1, 1991--September 30, 1991  

SciTech Connect

The overall objectives of the full-Scale Low-NOx Cell{trademark} Burner (LNCB{trademark}) Retrofit project is to demonstrate the cost-effective reduction of NOx generated by a large, base-loaded (70% capacity factor or greater), coal-fired utility boiler. Specific objectives include: (1) At least 50% NOx reduction over standard two-nozzle cell burners, without degradation of boiler performance or life; (2) acquire and evaluate emission and boiler performance data before and after the retrofit to determine NOx reduction and impact on overall boiler performance; (3) demonstrate that the LNCB{trademark} retrofits are the most cost-effective alternative to emerging, or commercially-available NOx control technology for units equipped with cell burners. The focus of this demonstration is to determine maximum NOx reduction capabilities without adversely impacting plant performance, operation and maintenance.

Not Available

1992-03-18T23:59:59.000Z

98

Full-scale hot cell test of an acoustic sensor dedicated to measurement of the internal gas pressure and composition of a LWR nuclear fuel rod  

SciTech Connect

A full-scale hot cell test of the internal gas pressure and composition measurement by an acoustic sensor was carried on successfully between 2008 and 2010 on irradiated fuel rods in the LECA-STAR facility at Cadarache Centre. The acoustic sensor has been specially designed in order to provide a nondestructive technique to easily carry out the measurement of the internal gas pressure and gas composition of a LWR nuclear fuel rod. This sensor has been achieved in 2007 and is now covered by an international patent. The first positive result, concerning the device behaviour, is that the sensor-operating characteristics have not been altered by a two-year exposure in the hot cell ambient. We performed the gas characterisation contained in irradiated fuel rods. The acoustic method accuracy is now {+-}5 bars on the pressure measurement result and {+-}0.3% on the evaluated gas composition. The results of the acoustic method were compared to puncture results. Another significant conclusion is that the efficiency of the acoustic method is not altered by the irradiation time, and possible modification of the cladding properties. These results make it possible to demonstrate the feasibility of the technique on irradiated fuel rods. The transducer and the associated methodology are now operational. (authors)

Ferrandis, J. Y.; Rosenkrantz, E.; Leveque, G. [CNRS - Univ. Montpellier 2, Southern Electronic Inst., UMR 5214, F-34095 Montpellier (France); Baron, D. [EDF, R and D, F-77250 Moret sur Loing (France); Segura, J. C. [EDF, SEPTEN, F-69628 Villeurbanne (France); Cecilia, G.; Provitina, O. [CEA - Nuclear Energy Direction DEN - Fuel Studies Dept. - Cadarache, F-13108 Saint-Paul-Lez-Durance (France)

2011-07-01T23:59:59.000Z

99

Investigation of the relationship between particulate-bound mercury and properties of fly ash in a full-scale 100 MWe pulverized coal combustion boiler  

Science Conference Proceedings (OSTI)

The properties of fly ash in coal-fired boilers influence the emission of mercury from power plants into the environment. In this study, seven different bituminous coals were burned in a full-scale 100 MWe pulverized coal combustion boiler and the derived fly ash samples were collected from a mechanical hopper (MH) and an electrostatic precipitator hopper (ESP). The mercury content, specific surface area (SSA), unburned carbon, and elemental composition of the fly ash samples were analyzed to evaluate the correlation between the concentration of particulate-bound mercury and the properties of coal and fly ash. For a given coal, it was found that the mercury content in the fly ash collected from the ESP was greater than in the fly ash samples collected from the MHP. This phenomenon may be due to a lower temperature of flue gas at the ESP (about 135{sup o}C) compared to the temperature at the air preheater (about 350{sup o}C). Also, a significantly lower SSA observed in MH ash might also contribute to the observation. A comparison of the fly ash samples generated from seven different coals using statistical methods indicates that the mercury adsorbed on ESP fly ashes has a highly positive correlation with the unburned carbon content, manganese content, and SSA of the fly ash. Sulfur content in coal showed a significant negative correlation with the Hg adsorption. Manganese in fly ash is believed to participate in oxidizing volatile elemental mercury (Hg{sup 0}) to ionic mercury (Hg{sup 2+}). The oxidized mercury in flue gas can form a complex with the fly ash and then get removed before the flue gas leaves the stack of the boiler.

Sen Li; Chin-Min Cheng; Bobby Chen; Yan Cao; Jacob Vervynckt; Amanda Adebambo; Wei-Ping Pan [Western Kentucky University, Bowling Green, KY (United States). Institute for Combustion Science and Environmental Technology

2007-12-15T23:59:59.000Z

100

Partitioning of mercury, arsenic, selenium, boron, and chloride in a full-scale coal combustion process equipped with selective catalytic reduction, electrostatic precipitation, and flue gas desulfurization systems  

SciTech Connect

A full-scale field study was carried out at a 795 MWe coal-fired power plant equipped with selective catalytic reduction (SCR), an electrostatic precipitator (ESP), and wet flue gas desulfurization (FGD) systems to investigate the distribution of selected trace elements (i.e., mercury, arsenic, selenium, boron, and chloride) from coal, FGD reagent slurry, makeup water to flue gas, solid byproduct, and wastewater streams. Flue gases were collected from the SCR outlet, ESP inlet, FGD inlet, and stack. Concurrent with flue gas sampling, coal, bottom ash, economizer ash, and samples from the FGD process were also collected for elemental analysis. By combining plant operation parameters, the overall material balances of selected elements were established. The removal efficiencies of As, Se, Hg, and B by the ESP unit were 88, 56, 17, and 8%, respectively. Only about 2.5% of Cl was condensed and removed from flue gas by fly ash. The FGD process removed over 90% of Cl, 77% of B, 76% of Hg, 30% of Se, and 5% of As. About 90% and 99% of the FGD-removed Hg and Se were associated with gypsum. For B and Cl, over 99% were discharged from the coal combustion process with the wastewater. Mineral trona (trisodium hydrogendicarbonate dehydrate, Na{sub 3}H(CO{sub 3}){sub 2}.2H{sub 2}O) was injected before the ESP unit to control the emission of sulfur trioxide (SO{sub 3}). By comparing the trace elements compositions in the fly ash samples collected from the locations before and after the trona injection, the injection of trona did not show an observable effect on the partitioning behaviors of selenium and arsenic, but it significantly increased the adsorption of mercury onto fly ash. The stack emissions of mercury, boron, selenium, and chloride were for the most part in the gas phase. 47 refs., 3 figs., 11 tabs.

Chin-Min Cheng; Pauline Hack; Paul Chu; Yung-Nan Chang; Ting-Yu Lin; Chih-Sheng Ko; Po-Han Chiang; Cheng-Chun He; Yuan-Min Lai; Wei-Ping Pan [Western Kentucky University, Bowling Green, KY (United States). Institute for Combustion Science and Environmental Technology

2009-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

102

CENTRAL PLATEAU REMEDIATION  

Science Conference Proceedings (OSTI)

A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.

ROMINE, L.D.

2006-02-01T23:59:59.000Z

103

CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY  

SciTech Connect

THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

BERGMAN TB; STEFANSKI LD; SEELEY PN; ZINSLI LC; CUSACK LJ

2012-09-19T23:59:59.000Z

104

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

105

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

106

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

107

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

108

REMEDIAL ACTION PLAN  

E-Print Network (OSTI)

designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

1990-01-01T23:59:59.000Z

109

Source control strategy accelerates remediation  

SciTech Connect

Shallow land burial of ion-level radioactive wastes at ORNL has resulted in the release of contaminants into surrounding soil, groundwater, and surface water. Multiple contaminated areas occurring in close proximity make it difficult to relate contaminant releases to a specific site. To address this issue, similar and contiguous contaminated sites within the same drainage area have been combined into Waste Area Groupings. These Waste Area Groupings were prioritized and became the focus of the Comprehensive Environmental Response, Compensation, and Liability Act remediation process. Since the majority of the groupings are in the White Oak Creek drainage basin, the remediation strategy is to control contaminant releases from these source areas first, followed by remediation of White Oak Creek. In planning the remediation program, it became clear that until the issues of ultimate land use and institutional control, waste treatment technologies, and waste disposal facilities are resolved, final remediation objectives cannot be defined and remedial alternatives cannot be evaluated. Consequently, instead of postponing remedial actions until these issues are resolved, a strategy to control the sources of contaminant release with a serie s of interim actions was developed. In the near term, this strategy reduces off-site risk by eliminating contaminant releases and controls on-site risk through institutional control. Source control will allow time to achieve consensus on long-term institutional control and land use issues to develop appropriate treatment technologies, and to construct the necessary disposal facilities without further environmental degradation.

Garland, S.B. II [Oak Ridge National Lab., TN (United States); Hammond, R. [Environmental Protection Agency, Atlanta, GA (United States). Region IV

1993-06-01T23:59:59.000Z

110

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 1090 of 28,560 results. 81 - 1090 of 28,560 results. Download Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young- Rainey STAR Center Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds.May 2004, Monterey, California.Gorm Heron, Steven Carroll, Hank Sowers, Bruce McGee,... http://energy.gov/lm/downloads/steam-and-et-dsp-combined-dnapl-remediation-full-scale-site Download Independent Activity Report, Los Alamos Site Office- April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] http://energy.gov/hss/downloads/independent-activity-report-los-alamos-site-office-april-2012 Download 2011 Annual Planning Summary for Argonne Site Office (Argonne)

111

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

112

Research and Development with Full Scale Research  

E-Print Network (OSTI)

One of the research programs of the Energy research Centre of the Netherlands (ECN) concerns the built environment. Several facilities to conduct the research activities are at ECN's disposal. One of these facilities, are five research dwellings located on the site of ECN (Petten, Netherlands). Measured data from these facilities together with weather data and computer models of the buildings are used to evaluate performance of innovative energy concepts and components in these systems. The facilities are used for a broad range of research activities as well as product development. This paper explains more about the test facilities and the methods that are used to evaluate performance.

Sijpheer, N.; Bakker, E.J.; Opstelten, I.

2010-01-01T23:59:59.000Z

113

Biogas: full-scale process design  

Science Conference Proceedings (OSTI)

A recent feasibility study of converting manure from 100,000 head of cattle methane revealed that the process is technically feasible, but the produced gas is not competitively priced when compared to alternate sources of natural gas. This paper describes the study and its findings.

Sailor, M.K.; Licht, L.A.

1981-01-01T23:59:59.000Z

114

Full Scale Tornado Missile Impact Tests  

Science Conference Proceedings (OSTI)

At the time of this interim report, approximately half the tests scheduled in the EPRI/Sandia Tornado-Missile Program had been completed. This report was issued to disseminate the results of the initial tests as quickly as possible, in order to satisfy the needs of utilities and architect-engineers engaged in plant-licensing procedures. The findings are presented with a minimum of interpretation.

1976-04-01T23:59:59.000Z

115

An Engineering and Economic Assessment of Alstom's Chilled Ammonia Process Development Unit (PDU) Design Applied at Full Scale to a n 1100 F Ultra-Supercritical Pulverized Coal Power Plant  

Science Conference Proceedings (OSTI)

EPRI’s CO2 capture program aims to assess promising CO2 capture processes for pulverized coal-fired boilers, assist in developing lower cost options than the best technologies/processes available to date, and accelerate promising capture technologies to full-scale commercialization. This report presents the findings and conclusions from EPRI’s Economic and Engineering Assessment of the initial Alstom chilled ammonia process (CAP) design, scaled up, and applied to ...

2012-10-30T23:59:59.000Z

116

Design and Testing of a Landfill Gas Cleanup System for Carbonate Fuel Cell Power Plants: Volume II: Full Scale Landfill Gas Cleanup for Carbonate Fuel Cell Power Plants (Proprietary)  

Science Conference Proceedings (OSTI)

This document is a proprietary version of section 5 of EPRI technical report TR-108043-V1. The volume contains detailed design information and operating conditions for a full-scale, low-cost cleanup system that would enable landfill gas to be used in carbonate fuel cells or other power generation devices. The EPRI-developed system is now available for license to commercial applications.

1998-02-27T23:59:59.000Z

117

X-701B Groundwater Remedy Portsmouth Ohio | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

X-701B Groundwater Remedy Portsmouth Ohio X-701B Groundwater Remedy Portsmouth Ohio Full Document and Summary Versions are available for download X-701B Groundwater Remedy...

118

Remedial Action Contacts Directory - 1997  

SciTech Connect

This document, which was prepared for the US Department of Energy (DOE) Office of Environmental Restoration (ER), is a directory of 2628 individuals interested or involved in environmental restoration and/or remedial actions at radioactively contaminated sites. This directory contains a list of mailing addresses and phone numbers of DOE operations, area, site, project, and contractor offices; an index of DOE operations, area, site, project, and contractor office sorted by state; a list of individuals, presented by last name, facsimile number, and e-mail address; an index of affiliations presented alphabetically, with individual contacts appearing below each affiliation name; and an index of foreign contacta sorted by country and affiliation. This document was generated from the Remedial Action Contacts Database, which is maintained by the Remedial Action Program Information Center (RAPIC).

1997-05-01T23:59:59.000Z

119

Remediation of Chicken Processing Wastewater using ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2010 TMS Annual Meeting & Exhibition. Symposium , Materials Processing Fundamentals. Presentation Title, Remediation of ...

120

Summary Protocol: Identification, Characterization, Designation, Remedial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Protocol: Identification, Characterization, Designation, Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification (January 1986) Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification (January 1986) More Documents & Publications Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites U.S. Department of Energy Guidelines for Residual Radioactive Material at

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Soil & Groundwater Remediation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Soil & Groundwater Soil & Groundwater Remediation Soil & Groundwater Remediation Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages the largest groundwater and soil remediation effort in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic meters of soil and debris contaminated with radionuclides, metals, and organics. The Office of Groundwater and Soil Remediation is working with DOE site managers around the country regarding specific technical issues. At the large sites such as Hanford, Savannah River, and Oak Ridge, the Office of Groundwater and Soil Remediation has conducted research and demonstration projects to test new technologies and remediation

122

Innovative Vitrification for Soil Remediation  

DOE Green Energy (OSTI)

Vortec has successfully completed Phases 1 and 2 of a technology demonstration program for an ''Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation.'' The principal objective of the program is to demonstrate the ability of a Vortec Cyclone Melting System (CMS) to remediate DOE contaminated soils and other waste forms containing TM RCRA hazardous materials, low levels of radionuclides and TSCA (PCB) containing wastes. The demonstration program will verify the ability of this vitrification process to produce a chemically stable glass final waste form which passes both TCLP and PCT quality control requirements, while meeting all federal and state emission control regulations. The demonstration system is designed to process 36 ton/day of as-received drummed or bulk wastes. The processing capacity equates to approximately 160 barrels/day of waste materials containing 30% moisture at an average weight of 450 lbs./barrel.

Hnat, James G.; Patten, John S.; Jetta, Norman W.

1996-12-31T23:59:59.000Z

123

Status report: Fernald site remediation  

Science Conference Proceedings (OSTI)

The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process.

Craig, J.R. Jr. [USDOE Fernald Field Office, OH (United States); Saric, J.A. [Environmental Protection Agency, Washington, DC (United States); Schneider, T. [Ohio State Environmental Protection Agency, Columbus, OH (United States); Yates, M.K. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States)

1995-01-30T23:59:59.000Z

124

2B-05.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, in: A.R. Gavaskar and A.S.C. Chen (Eds.), Remediation of Chlorinated and Recalcitrant Compounds 5, in: A.R. Gavaskar and A.S.C. Chen (Eds.), Remediation of Chlorinated and Recalcitrant Compounds -2004. Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds (Monterey, CA; May 2004). ISBN 1-57477-145-0, published by Battelle Press, Columbus, OH, www.battelle.org/bookstore. STEAM AND ET-DSP COMBINED FOR DNAPL REMEDIATION: FULL-SCALE SITE RESTORATION AT YOUNG-RAINEY STAR CENTER ABSTRACT: In March of 2003, the United States Department of Energy (DOE) com- pleted a full-scale nonaqueous-phase liquid (NAPL) remediation of Area A of the North- east Site at the Young-Rainey STAR Center, Largo, Florida. The site was contaminated with approximately 2,300 kg (5,000 lbs) of NAPL constituents such as TCE, cis-1,2-

125

X-701B Groundwater Remedy Portsmouth Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

X-701B Groundwater Remediation X-701B Groundwater Remediation ETR Report Date: December 2008 ETR-20 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the X-701B Groundwater Remedy, Portsmouth, Ohio Why DOE-EM Did This Review The Department of Energy (DOE) Portsmouth Paducah Project Office (PPPO) has responsibility for remediation of the X-701B ground water plume with the key contaminant of trichloroethene (TCE). The remedy has been divided into four phases: Phase I- Initial Source Area Treatment, Phase II-Expanded Source Area Treatment, Phase III-Evaluation and Reporting, and Phase IV- Downgradient Remediation and Confirmation of Source Area Treatment. Phase II treatment has injected

126

Arsenic Remediation Technologies for Groundwater and Soil  

Science Conference Proceedings (OSTI)

In October 2003, the Electric Power Research Institute (EPRI) released report 1008881, Arsenic Remediation Technologies for Soils and Groundwater. The report provides a review of available technologies for the remediation of arsenic in soils, groundwater, and surface water, primarily at substation sites. In most cases, the technologies reviewed are applicable to a much wider range of projects. In the six years since the publication of that report, the technologies for the remediation of arsenic have cont...

2009-09-22T23:59:59.000Z

127

DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH2M Hill Plateau Remediation Company for Plateau CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site June 19, 2008 - 1:29pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that CH2M Hill Plateau Remediation Company has been selected as the plateau remediation contractor for DOE's Hanford Site in southeastern Washington State. The contract is a cost-plus award-fee contract valued at approximately $4.5 billion over ten years (a five-year base period with the option to extend it for another five years). CH2M Hill Plateau Remediation Company is a limited liability company formed by CH2M Hill Constructors, Inc. The team also includes AREVA Federal

128

Electrochemical Arsenic Remediation for Rural Bangladesh  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrochemical Arsenic Remediation for Rural Bangladesh NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be updated until...

129

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

1990-09-01T23:59:59.000Z

130

Use of American Lotus in Pond Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

American Lotus in Pond Remediation Adam S. Riazi, Mathematics Department, Lincoln County High School, WV and Michael G. Ryon, Environmental Sciences Division, Oak Ridge National...

131

Introduction to Green & Sustainable Remediation: Three Approaches  

NLE Websites -- All DOE Office Websites (Extended Search)

TO GREEN & SUSTAINABLE REMEDIATION: THREE APPROACHES Dr. Jerry DiCerbo, Office of Sustainability Support (HS-21) June 2013 What is GSR? * Definitions differ among organizations...

132

Surfactant biocatalyst for remediation of recalcitrant ...  

Surfactant biocatalyst for remediation of recalcitrant organics and heavy metals United States Patent. Patent Number: 7,906,315: Issued: March 15, ...

133

Agencies plan continued DOE landfill remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies plan continued DOE landfill remediation Agencies plan continued DOE landfill remediation The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality and U.S. Environmental Protection Agency have released a planning document that specifies how DOE will continue to remediate a landfill containing hazardous and transuranic waste at DOE's Idaho Site located in eastern Idaho. The Phase 1 Remedial Design/Remedial Action Work Plan for Operable Unit 7-13/14 document was issued after the September 2008 Record of Decision (ROD) and implements the retrieval of targeted waste at the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex (RWMC). The SDA began receiving waste in 1952 and contains radioactive and chemical waste in approximately 35 acres of disposal pits, trenches and soil vaults.

134

Remediation of Mercury and Industrial Contaminants Applied Field...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Remediation of Mercury and Industrial Contaminants Applied Field Research...

135

SBA Increases Size Standards for Waste Remediation Services ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Increases Size Standards for Waste Remediation Services & InformationAdmin Support SBA Increases Size Standards for Waste Remediation Services & InformationAdmin Support December...

136

EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County,...

137

EA-1331: Remediation of Subsurface and Groundwater Contamination...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming EA-1331: Remediation of Subsurface and...

138

Building C-400 Thermal Treatment 90% Remedial Design Report and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Full Document...

139

Arsenic Remediation of Bangladesh Drinking Water using Iron-oxide...  

NLE Websites -- All DOE Office Websites (Extended Search)

Arsenic Remediation of Bangladesh Drinking Water using Iron-oxide Coated Coal Ash Title Arsenic Remediation of Bangladesh Drinking Water using Iron-oxide Coated Coal Ash...

140

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management...

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work  

SciTech Connect

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

D. E. Shanklin

2007-07-25T23:59:59.000Z

142

Applied Field Research Initiative Attenuation Based Remedies  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PA00133 - March 2011 PA00133 - March 2011 Applied Field Research Initiative Attenuation Based Remedies in the Subsurface Located at the Savannah River Site in Aiken, South Carolina, the Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) was established to develop the tools, approaches and technologies that will be required to address the technical challenges associated characteriza- tion, remediation and long-term monitoring of recalcitrant compounds in the subsurface at Department of Energy (DOE) Environmental Management (EM) sites. The ABRS AFRI site provides a unique setting for researchers in both applied and basic science fields. A wealth of subsurface data is available to support research activities and remedial decision making.

143

List of Contractors to Support Anthrax Remediation  

SciTech Connect

This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

Judd, Kathleen S.; Lesperance, Ann M.

2010-05-14T23:59:59.000Z

144

Remediation of Mercury and Industrial Contaminants  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative is to control the flux of contaminants in soil and water environments for the purpose of...

145

Guidance for Conducting Remedial Investigations and Feasibility...  

NLE Websites -- All DOE Office Websites (Extended Search)

Protection Agency Office of Emergency and Remedial Response Washington, DC 20460 PE89-184626 EPA540G-89004 OSWER Directive 9355.3-01 October 1988 Superfund EPA Guidance for...

146

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

147

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

1989-09-01T23:59:59.000Z

148

Reactant Carrier Microfoam Technology for In-Situ Remediation of Radionuclide and Metallic Contaminants in Deep Vadose Zone  

SciTech Connect

The U.S. Department of Energy (DOE) is currently developing advanced remedial technologies for addressing metal and radionuclide (Cr, Tc, and U) contamination in deep vadose zone environments. One of the transformational technology alternatives being considered by the DOE Office of Environmental Management, is the use of Reactant Carrier Microfoams (RCM) as a minimally invasive method for delivery and emplacement of reagents for in-situ immobilization of contaminants. Penetration of low permeability zones deep within the subsurface for Enhance Oil Recovery (EOR) has been well-established. Use of surfactant foams have also been explored for mobilizing DNAPL from sediments. So far, the concept of using RCM for immobilizing labile metal and long-lived radionuclide contaminants in the deep vadose zone has not been explored. We, at the Pacific Northwest National Laboratory (PNNL), conducted studies to develop stable foams as a means to deliver reductive and/or precipitating reactants to the deep subsurface. To test the feasibility of this approach, we developed a preliminary foam formulation consisting of a mixture of an anionic and a nonionic surfactant with a reactant consisting of a 9:1 blend of tripoly- and orthophosphate. The MSE Technology Applications, Inc (MSE) in collaboration with PNNL, conducted a scale-up test to evaluate the efficacy of this reactant carrier foam for in-situ immobilization of U containing sediment zones in a heterogenous sediment matrix. The data indicated that successful immobilization of U contamination is feasible using specifically tailored reactant carrier foam injection technology. Studies are continuing for developing more robust optimized RCM for highly mobile contaminants such as Cr (VI), Tc (VII) in the deep vadose zone.

Mattigod, Shas V.; Zhong, Lirong; Jansik, Danielle P.; Foote, Martin; Hart, Andrea T.; Wellman, Dawn M.

2010-07-01T23:59:59.000Z

149

SUSTAINABLE REMEDIATION SOFTWARE TOOL EXERCISE AND EVALUATION  

SciTech Connect

The goal of this study was to examine two different software tools designed to account for the environmental impacts of remediation projects. Three case studies from the Savannah River Site (SRS) near Aiken, SC were used to exercise SiteWise (SW) and Sustainable Remediation Tool (SRT) by including both traditional and novel remediation techniques, contaminants, and contaminated media. This study combined retrospective analysis of implemented projects with prospective analysis of options that were not implemented. Input data were derived from engineering plans, project reports, and planning documents with a few factors supplied from calculations based on Life Cycle Assessment (LCA). Conclusions drawn from software output were generally consistent within a tool; both tools identified the same remediation options as the 'best' for a given site. Magnitudes of impacts varied between the two tools, and it was not always possible to identify the source of the disagreement. The tools differed in their quantitative approaches: SRT based impacts on specific contaminants, media, and site geometry and modeled contaminant removal. SW based impacts on processes and equipment instead of chemical modeling. While SW was able to handle greater variety in remediation scenarios, it did not include a measure of the effectiveness of the scenario.

Kohn, J.; Nichols, R.; Looney, B.

2011-05-12T23:59:59.000Z

150

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

151

Remediation of Soil at Nuclear Sites  

Science Conference Proceedings (OSTI)

As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste.

Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

2000-03-01T23:59:59.000Z

152

Remediation of soil at nuclear sites  

SciTech Connect

As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

R. Holmes; C. Boardman; R. Robbins (BNFL); R. Fox; B. J. Mincher (INEEL)

2000-02-28T23:59:59.000Z

153

Technology development activities supporting tank waste remediation  

Science Conference Proceedings (OSTI)

This document summarizes work being conducted under the U.S. Department of Energy`s Office of Technology Development (EM-50) in support of the Tank Waste Remediation System (TWRS) Program. The specific work activities are organized by the following categories: safety, characterization, retrieval, barriers, pretreatment, low-level waste, and high-level waste. In most cases, the activities presented here were identified as supporting tank remediation by EM-50 integrated program or integrated demonstration lead staff and the selections were further refined by contractor staff. Data sheets were prepared from DOE-HQ guidance to the field issued in September 1993. Activities were included if a significant portion of the work described provides technology potentially needed by TWRS; consequently, not all parts of each description necessarily support tank remediation.

Bonner, W.F.; Beeman, G.H.

1994-06-01T23:59:59.000Z

154

Remedial action planning for Trench 1  

SciTech Connect

The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Greengard, T. [Kaiser Hill/SAIC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

155

DESCRIPTION OF MODELING ANALYSES IN SUPPORT OF THE 200-ZP-1 REMEDIAL DESIGN/REMEDIAL ACTION  

Science Conference Proceedings (OSTI)

The Feasibility Study/or the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-28) and the Proposed Plan/or Remediation of the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-33) describe the use of groundwater pump-and-treat technology for the 200-ZP-1 Groundwater Operable Unit (OU) as part of an expanded groundwater remedy. During fiscal year 2008 (FY08), a groundwater flow and contaminant transport (flow and transport) model was developed to support remedy design decisions at the 200-ZP-1 OU. This model was developed because the size and influence of the proposed 200-ZP-1 groundwater pump-and-treat remedy will have a larger areal extent than the current interim remedy, and modeling is required to provide estimates of influent concentrations and contaminant mass removal rates to support the design of the aboveground treatment train. The 200 West Area Pre-Conceptual Design/or Final Extraction/Injection Well Network: Modeling Analyses (DOE/RL-2008-56) documents the development of the first version of the MODFLOW/MT3DMS model of the Hanford Site's Central Plateau, as well as the initial application of that model to simulate a potential well field for the 200-ZP-1 remedy (considering only the contaminants carbon tetrachloride and technetium-99). This document focuses on the use of the flow and transport model to identify suitable extraction and injection well locations as part of the 200 West Area 200-ZP-1 Pump-and-Treat Remedial Design/Remedial Action Work Plan (DOEIRL-2008-78). Currently, the model has been developed to the extent necessary to provide approximate results and to lay a foundation for the design basis concentrations that are required in support of the remedial design/remediation action (RD/RA) work plan. The discussion in this document includes the following: (1) Assignment of flow and transport parameters for the model; (2) Definition of initial conditions for the transport model for each simulated contaminant of concern (COC) (i.e., carbon tetrachloride, technetium-99, iodine-129, nitrate [as NO{sub 3}], trichloroethene [TCE], total chromium, tritium), plus uranium; (3) Assumptions underlying the predictive simulations, including the phased implementation of the final full remedy; (4) Approximate number, locations, and rates of extraction and injection wells; and (5) Predicted amounts of contaminant mass extracted and influent concentrations at individual extraction wells for each COC and for uranium. This document is a companion report to pre-conceptual design document (DOE/RL-2008-56). Together these documents describe the sequential, progressive development of the modeling analyses and design basis for the 200-ZP-1 OU remedy.

VONGARGEN BH

2009-11-03T23:59:59.000Z

156

Mitigation and Remediation of Mercury Contamination at the Y...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation and Remediation of Mercury Contamination at the Y-12 Plant Oak Ridge Mitigation and Remediation of Mercury Contamination at the Y-12 Plant Oak Ridge Full Document and...

157

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah...

158

DOE Selects CH2M Hill Plateau Remediation Company for Plateau...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its...

159

Groundwater Remediation Strategy Using Global Optimization Algorithms  

E-Print Network (OSTI)

. DOI: 10.1061/ ASCE 0733-9496 2002 128:6 431 CE Database keywords: Ground water; Remedial action; Algorithms; Ground-water management. Introduction The contamination of groundwater is a widespread problem al. 1992 , Jonoski et al. 1997 ; and Willis and Yeh 1987 . However, the fact that the optimization

Neumaier, Arnold

160

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Preliminary Notice of Violation, Rocky Mountain Remediation Services -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Mountain Remediation Rocky Mountain Remediation Services - EA-97-04 Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 June 6, 1997 Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) This letter refers to the Department of Energy's (DOE) evaluation of noncompliances associated with the dispersal of radioactive material during the remediation of trenches. Preliminary Notice of Violation, Rocky Mountain Remediation Services - EA-97-04 More Documents & Publications Preliminary Notice of Violation, Kaiser-Hill Company - EA-97-03 Consent Order, Kaiser-Hill Company, LLC - EA 98-03 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site

162

Armored Enzyme Nanoparticles for Remediation of Subsurface  

Science Conference Proceedings (OSTI)

The remediation of subsurface contaminants is a critical problem for the Department of Energy, other government agencies, and our nation. Severe contamination of soil and groundwater exists at several DOE sites due to various methods of intentional and unintentional release. Given the difficulties involved in conventional removal or separation processes, it is vital to develop methods to transform contaminants and contaminated earth/water to reduce risks to human health and the environment. Transformation of the contaminants themselves may involve conversion to other immobile species that do not migrate into well water or surface waters, as is proposed for metals and radionuclides; or degradation to harmless molecules, as is desired for organic contaminants. Transformation of contaminated earth (as opposed to the contaminants themselves) may entail reductions in volume or release of bound contaminants for remediation.

Grate, Jay W.

2005-09-01T23:59:59.000Z

163

Radioactive tank waste remediation focus area  

SciTech Connect

EM`s Office of Science and Technology has established the Tank Focus Area (TFA) to manage and carry out an integrated national program of technology development for tank waste remediation. The TFA is responsible for the development, testing, evaluation, and deployment of remediation technologies within a system architecture to characterize, retrieve, treat, concentrate, and dispose of radioactive waste stored in the underground stabilize and close the tanks. The goal is to provide safe and cost-effective solutions that are acceptable to both the public and regulators. Within the DOE complex, 335 underground storage tanks have been used to process and store radioactive and chemical mixed waste generated from weapon materials production and manufacturing. Collectively, thes tanks hold over 90 million gallons of high-level and low-level radioactive liquid waste in sludge, saltcake, and as supernate and vapor. Very little has been treated and/or disposed or in final form.

1996-08-01T23:59:59.000Z

164

2010sr31_box-remediation.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, November 18, 2010 Thursday, November 18, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 292-2484 paivi.nettamo@srs.gov SRS Recovery Act TRU Waste Project Ahead of Schedule with Box Remediation Program Aiken, SC - The U.S. Department of Energy's Savannah River Site (SRS) started off the last 12 months of the American Recovery and Reinvestment Act with an enormous success in its legacy transuranic (TRU) waste program. The H-Canyon

165

Tank waste remediation system mission analysis report  

SciTech Connect

This document describes and analyzes the technical requirements that the Tank Waste Remediation System (TWRS) must satisfy for the mission. This document further defines the technical requirements that TWRS must satisfy to supply feed to the private contractors` facilities and to store or dispose the immobilized waste following processing in these facilities. This document uses a two phased approach to the analysis to reflect the two-phased nature of the mission.

Acree, C.D.

1998-01-09T23:59:59.000Z

166

Proceedings: Hazardous Waste Material Remediation Technology Workshop  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop on hazardous waste materials remediation. The workshop was the fourth in a series initiated by EPRI to aid utility personnel in assessing technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of hazardous waste management as they relate to nuclear plant decommissioning. The information will help utilities understand hazardous waste issues, select technologies for their individual projects, and reduce decom...

1999-11-23T23:59:59.000Z

167

Remediation and Recycling of Linde FUSRAP Materials  

SciTech Connect

During World War II, the Manhattan Engineering District (MED) utilized facilities in the Buffalo, New York area to extract natural uranium from uranium-bearing ores. The Linde property is one of several properties within the Tonawanda, New York Formerly Utilized Sites Remedial Action Program (FUSRAP) site, which includes Linde, Ashland 1, Ashland 2, and Seaway. Union Carbide Corporation's Linde Division was placed under contract with the Manhattan Engineering District (MED) from 1942 to 1946 to extract uranium from seven different ore sources: four African pitchblende ores and three domestic ores. Over the years, erosion and weathering have spread contamination from the residuals handled and disposed of at Linde to adjacent soils. The U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) negotiated a Federal Facilities Agreement (FFA) governing remediation of the Linde property. In Fiscal Year (FY) 1998, Congress transferred cleanup management responsibility for the sites in the FUSRAP program, including the Linde Site, from the DOE to the U.S. Army Corps of Engineers (USACE), with the charge to commence cleanup promptly. All actions by the USACE at the Linde Site are being conducted subject to the administrative, procedural, and regulatory provisions of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) and the existing FFA. USACE issued a Proposed Plan for the Linde Property in 1999 and a Final Record of Decision (ROD) in 2000. USACE worked with the local community near the Tonawanda site, and after considering public comment, selected the remedy calling for removing soils that exceed the site-specific cleanup standard, and transporting the contaminated material to off-site locations. The selected remedy is protective of human health and the environment, complies with Federal and State requirements, and meets commitments to the community.

Coutts, P. W.; Franz, J. P.; Rehmann, M. R.

2002-02-27T23:59:59.000Z

168

Laboratory/industry partnerships for environmental remediation  

SciTech Connect

There are two measures of ``successful`` technology transfer in DOE`s environmental restoration and waste management program. The first is remediation of DOE sites, and the second is commercialization of an environmental remediation process or product. The ideal case merges these two in laboratory/industry partnerships for environmental remediation. The elements to be discussed in terms of their effectiveness in aiding technology transfer include: a decision-making champion; timely and sufficient funding; well organized technology transfer function; well defined DOE and commercial markets; and industry/commercial partnering. Several case studies are presented, including the successful commercialization of a process for vitrification of low-level radioactive waste, the commercial marketing of software for hazardous waste characterization, and the application of a monitoring technique that has won a prestigious technical award. Case studies will include: vitrification of low-level radioactive waste (GTS Duratek, Columbia, MD); borehole liner for emplacing instrumentation and sampling groundwater (Science and Engineering Associates, Inc., Santa Fe, NM); electronic cone penetrometer (Applied Research Associates, Inc., South Royalton, VT); and software for hazardous waste monitoring ConSolve, Inc. (Lexington, MA). The roles of the Department of Energy and Argonne National Laboratory in these successes will be characterized.

Beskid, N.J.; Zussman, S.K.

1994-09-01T23:59:59.000Z

169

Tank waste remediation system configuration management plan  

SciTech Connect

The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

Vann, J.M.

1998-01-08T23:59:59.000Z

170

Sagging Line Mitigator (SLiM) Full-Scale Demonstration  

Science Conference Proceedings (OSTI)

High conductor temperature operations cause excessive sag on transmission lines and thus limit ampacity. The Sagging Line Mitigator (SLiM) is a new class of transmission line hardware that fixes this problem in real time. In response to high conductor temperatures, SLiM decreases the effective length of conductor in the span. This mitigates the thermal expansion experienced by the conductor and reduces or eliminates excess sag. In this demonstration study, a preproduction SLiM device reliably reduced exc...

2005-02-22T23:59:59.000Z

171

Full-scale wind turbine rotor aerodynamics research  

DOE Green Energy (OSTI)

The United States Department of Energy and the National Renewable Energy Laboratory (NREL) are conducting research to improve wind turbine technology at the NREL National Wind Technology Center (NWTC). One program, the Combined Experiment, has focused on making measurements needed to understand aerodynamic and structural responses of horizontal-axis wind turbines (HAWT). A new phase of this program, the Unsteady Aerodynamics Experiment, will focus on quantifying unsteady aerodynamic phenomena prevalent in stall-controlled HAWTs. Optimally twisted blades and innovative instrumentation and data acquisition systems will be used in these tests. Data can now be acquired and viewed interactively during turbine operations. This paper describes the NREL Unsteady Aerodynamics Experiment and highlights planned future research activities.

Simms, D A; Butterfield, C P

1994-11-01T23:59:59.000Z

172

NETL: Mercury Emissions Control Technologies - Full-scale Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

electrostatic precipitator for particulate control, and a wet FGD system for SO2 control. The FGD system has three modules, two of which are normally operated....

173

Full Scale Gatorizing™ of Fine Grain Inconel 718  

Science Conference Proceedings (OSTI)

and fine grain size achieved in the extruded billet as well as the high cost ... with alloys such as 718, 901, or A286 succeeded in producing fine-grained billet by using ... by oil quench and aging at 718"C/8 hrs. and furnace cool to 62l0CI8 hrs.

174

Salmon Site Remedial Investigation Report, Exhibit 5  

Science Conference Proceedings (OSTI)

This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

USDOE /NV

1999-09-01T23:59:59.000Z

175

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program (March 2012)

176

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

177

Independent Activity Report, CH2M Hill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, CH2M Hill Plateau Remediation Company Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 January 2011 Review of the CH2M Hill Plateau Remediation Company Unreviewed Safety Question Procedure [ARPT-RL-2011-003] The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security, during a site visit from January 10-14, 2011, presented the results of a technical review of the CH2M Hill Plateau Remediation Company (PRC) Unreviewed Safety Question (USQ) Procedure. Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 More Documents & Publications CX-009415: Categorical Exclusion Determination Independent Activity Report, Richland Operations Office - January 2011

178

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

179

Remediation of Mercury and Industrial Contaminants Applied Field Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Mercury and Industrial Contaminants Applied Field Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative (RoMIC-AFRI) Located on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, the RoMIC-AFRI was established to protect water resources by addressing the challenge of preventing contamination. The initiative at Oak Ridge is a collaborative effort that leverages DOE investments in basic science and applied research and the work of site contractors to address the complex challenges in the remediation of legacy waste at the Oak Ridge Reservation. The mission of the Remediation of Mercury and Industrial Contaminants

180

Uranium Mill Tailings Remedial Action Project 1993 Environmental Report  

SciTech Connect

This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

Not Available

1994-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Historical hydronuclear testing: Characterization and remediation technologies  

SciTech Connect

This report examines the most current literature and information available on characterization and remediation technologies that could be used on the Nevada Test Site (NTS) historical hydronuclear test areas. Historical hydronuclear tests use high explosives and a small amount of plutonium. The explosion scatters plutonium within a contained subsurface environment. There is currently a need to characterize these test areas to determine the spatial extent of plutonium in the subsurface and whether geohydrologic processes are transporting the plutonium away from the event site. Three technologies were identified to assist in the characterization of the sites. These technologies are the Pipe Explorer{trademark}, cone penetrometer, and drilling. If the characterization results indicate that remediation is needed, three remediation technologies were identified that should be appropriate, namely: capping or sealing the surface, in situ grouting, and in situ vitrification. Capping the surface would prevent vertical infiltration of water into the soil column, but would not restrict lateral movement of vadose zone water. Both the in situ grouting and vitrification techniques would attempt to immobilize the radioactive contaminants to restrict or prevent leaching of the radioactive contaminants into the groundwater. In situ grouting uses penetrometers or boreholes to inject the soil below the contaminant zone with low permeability grout. In situ vitrification melts the soil containing contaminants into a solid block. This technique would provide a significantly longer contaminant immobilization, but some research and development would be required to re-engineer existing systems for use at deep soil depths. Currently, equipment can only handle shallow depth vitrification. After existing documentation on the historical hydronuclear tests have been reviewed and the sites have been visited, more specific recommendations will be made.

Shaulis, L.; Wilson, G.; Jacobson, R.

1997-09-01T23:59:59.000Z

182

The mission of the Remediation of Mercury and Industrial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative is to control the flux of contaminants in soil and water environments for the purpose of...

183

Conative Factors in the Context of Adolescent Reading Remediation.  

E-Print Network (OSTI)

??The present study investigated variability in the remedial outcomes of 105 adolescents with reading disabilities who participated in PHAST PACES, a research-based reading intervention with… (more)

Luckett-Gatopoulos, Sarah Elizabeth Anastasia

2011-01-01T23:59:59.000Z

184

Mitigation and Remediation of Mercury Contamination at the Y...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and surface water Hg remediation strategy for adequacy in reducing Hg levels in the fish and to indentify opportunities to achieve cost and technical improvements andor to...

185

DOE Selects Savannah River Remediation, LLC for Liquid Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2009. Savannah River Remediation, LLC is a limited liability company consisting of URS Washington Division; Babcock & Wilcox Technical Services Group, Inc.; Bechtel National,...

186

Building C-400 Thermal Treatment 90% Remedial Design Report and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Paducah Gaseous Diffusion Plant (PGDP) Review Report: Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation, PGDP, Paducah Kentucky...

187

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

1 January 2005 HYDROGEN EMBRITTLEMENT OF PIPELINE STEELS: CAUSES AND REMEDIATION P. Sofronis, I. Robertson, D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline...

188

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

or the general public under current conditions of site usage. . 1 U.S. Department of Energy Guidelines for Residual Radioactivity at Formerly Utilized Sites Remedial Action...

189

Microsoft Word - Remedial Action Program Update.rtf  

Office of Legacy Management (LM)

contamination that the owner must address. The Corps and the site owner are exploring alternative ways of remediating the site to achieve the most cost effective and efficient...

190

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

for Residual Radioactivity at Formerly Utilized Sites Remedial Action Program and Remote Surplus Facilities Management Program Sites (Rev. 1, July 1985). .. . -.-----...

191

Attenuation-Based Remedies in the Subsurface Applied Field Research...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subsurface Applied Field Research Initiative (ABRS AFRI) Located at the Savannah River Site in Aiken, South Carolina, the Attenuation-Based Remedies in the Subsurface Applied...

192

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

no remedial action is necessary at this site and has eliminated the Westinghouse Atomic Power Development Plant from further consideration under the Formerly Utilized Sites...

193

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

BUILDING 7 BLOOMFIELD, NEW JERSEY SW 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site...

194

Savannah River Remediation Donates $10,000 to South Carolina...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Waste Tank Closures Since 1997 A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where...

195

Savannah River Remediation Donates $10,000 to South Carolina...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commemorate Historic Cleanup Milestone A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where...

196

Innovative Sediment Remediation Using a Risk-based Mixed Remedy at the Laconia Manufactured Gas Plant Site: Data and Lessons  

Science Conference Proceedings (OSTI)

This report presents a case study of the sediment remediation project at the Messer Street manufactured gas plant in Laconia, New Hampshire. The report describes a strategy developed to achieve the goal of a remedial action satisfactory to stakeholder goals and interests and which met the utility's business objectives of cost control, schedule, and positive community relations. Key elements in the strategy included a focused site characterization resulting in a remedial action plan prescribed to definite...

2001-11-26T23:59:59.000Z

197

REVIEW REPORT: BUILDING C-400 THERMAL TREATMENT 90 PERCENT REMEDIAL DESIGN REPORT AND SITE INVESTIGATION, PGDP, PADUCAH, KENTUCKY  

Science Conference Proceedings (OSTI)

On 9 April 2007, the U.S. Department of Energy (DOE) Headquarters, Office of Soil and Groundwater Remediation (EM-22) initiated an Independent Technical Review (ITR) of the 90% Remedial Design Report (RDR) and Site Investigation (RDSI) for thermal treatment of trichloroethylene (TCE) in the soil and groundwater in the vicinity of Building C-400 at the Paducah Gaseous Diffusion Plant (PGDP). The general ITR goals were to assess the technical adequacy of the 90% RDSI and provide recommendations sufficient for DOE to determine if modifications are warranted pertaining to the design, schedule, or cost of implementing the proposed design. The ultimate goal of the effort was to assist the DOE Paducah/Portsmouth Project Office (PPPO) and their contractor team in ''removing'' the TCE source zone located near the C-400 Building. This report provides the ITR findings and recommendations and supporting evaluations as needed to facilitate use of the recommendations. The ITR team supports the remedial action objective (RAO) at C-400 to reduce the TCE source area via subsurface Electrical Resistance Heating (ERH). Further, the ITR team commends PPPO, their contractor team, regulators, and stakeholders for the significant efforts taken in preparing the 90% RDR. To maximize TCE removal at the target source area, several themes emerge from the review which the ITR team believes should be considered and addressed before implementing the thermal treatment. These themes include the need for: (1) Accurate and site-specific models as the basis to verify the ERH design for full-scale implementation for this challenging hydrogeologic setting; (2) Flexible project implementation and operation to allow the project team to respond to observations and data collected during construction and operation; (3) Defensible performance metrics and monitoring, appropriate for ERH, to ensure sufficient and efficient clean-up; and (4) Comprehensive (creative and diverse) contingencies to address the potential for system underperformance, and other unforeseen conditions These themes weave through the ITR report and the various analyses and recommendations. The ITR team recognizes that a number of technologies are available for treatment of TCE sources. Further, the team supports the regulatory process through which the selected remedy is being implemented, and concurs that ERH is a potentially viable remedial technology to meet the RAOs adjacent to C-400. Nonetheless, the ITR team concluded that additional efforts are needed to provide an adequate basis for the planned ERH design, particularly in the highly permeable Regional Gravel Aquifer (RGA), where sustaining target temperatures present a challenge. The ERH design modeling in the 90% RDR does not fully substantiate that heating in the deep RGA, at the interface with the McNairy formation, will meet the design goals; specifically the target temperatures. Full-scale implementation of ERH to meet the RAOs is a challenge in the complex hydrogeologic setting at PGDP. Where possible, risks to the project identified in this ITR report as ''issues'' and ''recommendations'' should be mitigated as part of the final design process to increase the likelihood of remedial success. The ITR efforts were organized into five lines of inquiry (LOIs): (1) Site investigation and target zone delineation; (2) Performance objectives; (3) Project and design topics; (4) Health and safety; and (5) Cross cutting and independent cost evaluation. Within each of these LOIs, the ITR team identified a series of unresolved issues--topics that have remaining uncertainties or potential project risks. These issues were analyzed and one or more recommendations were developed for each. In the end, the ITR team identified 27 issues and provided 50 recommendations. The issues and recommendations are briefly summarized below, developed in Section 5, and consolidated into a single list in Section 6. The ITR team concluded that there are substantive unresolved issues and system design uncertainties, resulting in technical and financial risks to DOE.

Looney, B; Jed Costanza, J; Eva Davis, E; Joe Rossabi, J; Lloyd (Bo) Stewart, L; Hans Stroo, H

2007-08-15T23:59:59.000Z

198

RCRA Information Brief, June 1996: Conditional remedies under RCRA correction action  

Science Conference Proceedings (OSTI)

This document describes conditional remedies under RCRA corrective action. The definition of conditional remedies, criteria that must be met, applications to DOE facilities, applicable clean-up standards, and implementation of conditional remedies are discussed in the document.

NONE

1996-06-01T23:59:59.000Z

199

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

Science Conference Proceedings (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

200

Remediation of Abandoned Mines Using Coal Combustion By-Products  

E-Print Network (OSTI)

Remediation of Abandoned Mines Using Coal Combustion By-Products Sowmya Bulusu1 ; Ahmet H. Aydilek that occurs when pyrite that is present in abandoned coal mines comes in contact with oxygen and water, which subject headings: Remedial action; Acid mine water; Mines; Coals; Recycling; Maryland; Fly ash

Aydilek, Ahmet

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Groundwater and Soil Remediation Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Groundwater and Soil Remediation Guidelines provides the nuclear power industry with technical guidance for evaluating the need for and timing of remediation of soil and/or groundwater contamination from onsite leaks, spills, or inadvertent releases to a) prevent migration of licensed material off-site and b) minimize decommissioning impacts.

2010-12-21T23:59:59.000Z

202

Uranium Mill Tailings Remedial Action Project 1994 environmental report  

Science Conference Proceedings (OSTI)

This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

NONE

1995-08-01T23:59:59.000Z

203

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

E-Print Network (OSTI)

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group Workshop% · Contractor share: 25% · Barriers ­ Hydrogen embrittlement of pipelines and remediation (mixing with water

204

In Situ Environmental Remediation of an Energized Substation  

Science Conference Proceedings (OSTI)

The remediation of contaminated soil and groundwater at energized substations presents special technical, safety, and cost challenges to affected utilities. This study, conducted at an energized substation contaminated with arsenic, evaluated remedial technologies for groundwater and soil treatment and analyzed their cost effectiveness.

2001-12-04T23:59:59.000Z

205

Independent Activity Report, Savannah River Remediation - July 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation - July 2010 Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality Assurance (OSQA), Technical Support Division (TSD) Integrated Safety Management System (ISMS), Phase II Verification of Savannah River Remediation (SRR). The purpose of the DOE-SR Phase II ISMS Verification was to verify that the SRR ISMS Description that was submitted to and approved by the DOE-SR Manager is being effectively implemented at the Savannah

206

DOE Awards Contract for Environmental Remediation Services at California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Remediation Services at Environmental Remediation Services at California Santa Susana Field Laboratory DOE Awards Contract for Environmental Remediation Services at California Santa Susana Field Laboratory September 27, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati - The Department of Energy (DOE) today awarded a task order (contract) to CDM, A Joint Venture, of Fairfax, Virginia, to provide environmental remediation services for the Energy Technology Engineering Center at the Santa Susana Field Laboratory, Canoga Park, California. The cost-plus incentive fee task order has a 36-month performance period and a value of $11.3 million. CDM will continue to assist DOE in chemical sampling, the preparation of a chemical data gap analysis and preparing a soils remediation action

207

EA-1331: Remediation of Subsurface and Groundwater Contamination at the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

331: Remediation of Subsurface and Groundwater Contamination at 331: Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming EA-1331: Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming SUMMARY This EA evaluates the environmental impacts for the proposal for the Rock Springs In-Situ Oil Shale Retort Test Site remediation that would be performed at the Rock Springs site in Sweetwater County, Wyoming. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 31, 2000 EA-1331: Finding of No Significant Impact Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site July 31, 2000 EA-1331: Final Environmental Assessment

208

EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

198: Uranium Mill Tailings Remedial Action Groundwater Project 198: Uranium Mill Tailings Remedial Action Groundwater Project EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project SUMMARY This EIS assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 28, 1997 EIS-0198: Record of Decision Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) December 1, 1996 EIS-0198: Programmatic Environmental Impact Statement Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project

209

Implementation of the Formerly Utilized Sites Remedial Action Program:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of the Formerly Utilized Sites Remedial Action Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) More Documents & Publications Recent Developments in DOE FUSRAP

210

Summary - X-701B Groundwater Remedy, Portsmouth, Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

X-701B Groundwater Remediation ETR Report Date: December 2008 ETR-20 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the X-701B Groundwater Remedy, Portsmouth, Ohio Why DOE-EM Did This Review The Department of Energy (DOE) Portsmouth Paducah Project Office (PPPO) has responsibility for remediation of the X-701B ground water plume with the key contaminant of trichloroethene (TCE). The remedy has been divided into four phases: Phase I- Initial Source Area Treatment, Phase II-Expanded Source Area Treatment, Phase III-Evaluation and Reporting, and Phase IV- Downgradient Remediation and Confirmation of Source Area Treatment. Phase II treatment has injected catalyzed hydrogen peroxide without meeting the

211

DEMONSTRATION OF ELECTROCHEMICAL REMEDIATION TECHNOLOGIES-INDUCED COMPLEXATION  

SciTech Connect

The Project Team is submitting this Topical Report on the results of its bench-scale demonstration of ElectroChemical Remediation Technologies (ECRTs) and in particular the Induced Complexation (ECRTs-IC) process for remediation of mercury contaminated soils at DOE Complex sites. ECRTs is an innovative, in-situ, geophysically based soil remediation technology with over 50 successful commercial site applications involving remediation of over two million metric tons of contaminated soils. ECRTs-IC has been successfully used to remediate 220 cu m of mercury-contaminated sediments in the Union Canal, Scotland. In that operation, ECRTs-IC reduced sediment total mercury levels from an average of 243 mg/kg to 6 mg/kg in 26 days of operation. The clean up objective was to achieve an average total mercury level in the sediment of 20 mg/kg.

Barry L. Burks

2002-12-01T23:59:59.000Z

212

Inefficient remediation of ground-water pollution  

SciTech Connect

The problem of trying to remove ground-water pollution by pumping and treating are pointed out. Various Superfund sites are discussed briefly. It is pointed out that many chemicals have been discarded in an undocumented manner, and their place in the groundwater is not known. Results of a remedial program to remove perchloroethylene at a concentration of 6132 parts per billion from groundwater in a site in New Jersey showed that with an average extraction rate of 300 gallons per minute from 1978 to 1984 contamination level was lowered below 100 parts per billion. However, after shutdown of pumping the level rose to 12,588 parts per billion in 1988. These results lead the author to propose that the practical solutions for water supplies may be treatment at the time it enters the system for use.

Abelson, P.H.

1990-11-09T23:59:59.000Z

213

Tank waste remediation system engineering plan  

SciTech Connect

This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

Rifaey, S.H.

1998-01-09T23:59:59.000Z

214

Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action  

SciTech Connect

The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

1994-09-01T23:59:59.000Z

215

Remedial investigation report for J-Field, Aberdeen Proving Ground, Maryland. Volume 1: Remedial investigation results  

Science Conference Proceedings (OSTI)

This report presents the results of the remedial investigation (RI) conducted at J-Field in the Edgewood Area of Aberdeen Proving Ground (APG), a U.S. Army installation located in Harford County, Maryland. Since 1917, activities in the Edgewood Area have included the development, manufacture, and testing of chemical agents and munitions and the subsequent destruction of these materials at J-Field by open burning and open detonation. These activities have raised concerns about environmental contamination at J-Field. This RI was conducted by the Environmental Conservation and Restoration Division, Directorate of Safety, Health and Environmental Division of APG, pursuant to requirements outlined under the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA). The RI was accomplished according to the procedures developed by the U.S. Environmental Protection Agency (EPA 1988). The RI provides a comprehensive evaluation of the site conditions, nature of contaminants present, extent of contamination, potential release mechanisms and migration pathways, affected populations, and risks to human health and the environment. This information will be used as the basis for the design and implementation of remedial actions to be performed during the remedial action phase, which will follow the feasibility study (FS) for J-Field.

Yuen, C. R.; Martino, L. E.; Biang, R. P.; Chang, Y. S.; Dolak, D.; Van Lonkhuyzen, R. A.; Patton, T. L.; Prasad, S.; Quinn, J.; Rosenblatt, D. H.; Vercellone, J.; Wang, Y. Y.

2000-03-14T23:59:59.000Z

216

Remedial design and remedial action guidance for the Idaho National Engineering Laboratory  

SciTech Connect

The US Department of Energy, Idaho Operations Office (DOE-ID), the US Environmental Protection Agency, Region X (EPA), and the Idaho Department of Health and Welfare (IDHW) have developed this guidance on the remedial design and remedial action (RD/RA) process. This guidance is applicable to activities conducted under the Idaho National Engineering Laboratory (INEL) Federal Facility Agreement and Consent Order (FFA/CO) and Action Plan. The INEL FFA/CO and Action Plan provides the framework for performing environmental restoration according to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The guidance is intended for use by the DOE-ID, the EPA, and the IDHW Waste Area Group (WAG) managers and others involved in the planning and implementation of CERCLA environmental restoration activities. The scope of the guidance includes the RD/RA strategy for INEL environmental restoration projects and the approach to development and review of RD/RA documentation. Chapter 2 discusses the general process, roles and responsibilities, and other elements that define the RD/RA strategy. Chapters 3 through 7 describe the RD/RA documents identified in the FFA/CO and Action Plan. Chapter 8 provides examples of how this guidance can be applied to restoration projects. Appendices are included that provide excerpts from the FFA/CO pertinent to RD/RA (Appendix A), a applicable US Department of Energy (DOE) orders (Appendix B), and an EPA Engineering ``Data Gaps in Remedial Design`` (Appendix C).

1993-10-01T23:59:59.000Z

217

Effects of remediation amendments on vadose zone microorganisms  

SciTech Connect

Surfactant-based foam delivery technology has been studied to remediate Hanford 200 area deep vadose zone sediment. However, the surfactants and remediation amendments have an unknown effect on indigenous subsurface microorganisms. Microbial populations are important factors to consider in remediation efforts due to their potential to alter soil geochemistry. This project focuses on measuring microbial metabolic responses to remediation amendments in batch and column studies using Deep Vadose Zone Sediments. Initial studies of the microbes from Hanford 200 area deep vadose zone sediment showed surfactants sodium dodecyl sulfate (SDS) and cocamidopropyl betaine (CAPB) and remediation amendment calcium polysulfide (CPS) had no affect on microbial growth using BiologTM Ecoplates. To move towards a more realistic field analog, soil columns were packed with Hanford 200 Area sediment. Once microbial growth in the column was verified by observing growth of the effluent solution on tryptic soy agar plates, remedial surfactants were injected into the columns, and the resulting metabolic diversity was measured. Results suggest surfactant sodium dodecyl sulfate (SDS) stimulates microbial growth. The soil columns were also visualized using X-ray microtomography to inspect soil packing and possibly probe for evidence of biofilms. Overall, BiologTM Ecoplates provide a rapid assay to predict effects of remediation amendments on Hanford 200 area deep vadose zone microorganisms.

Miller, Hannah M.; Tilton, Fred A.

2012-08-10T23:59:59.000Z

218

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

I I c. ,..I -. i FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC.) KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decomnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 . 2 ii .-_. _.--_- "~ ELIMINATION REPORT FORMER BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC. 1 KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and kaste Technology, Division of Facility and Site

219

FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT  

Office of Legacy Management (LM)

(' (' . . FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT FORMER VITRO LABORATORIES FORMER VITRO LABORATORIES VITRO CORPORATION VITRO CORPORATION WEST ORANGE, NEW JERSEY WEST ORANGE, NEW JERSEY SEP 30 1985 SEP 30 1985 Department of Energy Office of Nuclear Waste Office of Remedial Action and Waste Technology Division of Facility and Site Deconxnissioning Projects . CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii Page 7 3 4 - _- mI _---. ELSMINATION REPORT FORMER VITRO LABORATORIES, VITRO CORPORATION, WEST ORAN6E, NEW JERSEY INTRODUCTION . The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site

220

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) _ WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK SEP 301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ----- ----_l_.._- .._. _- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii .- --- .- Page . 1 4 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK 1 INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Sulfate Reduction in Groundwater: Characterization and Applications for Remediation  

Science Conference Proceedings (OSTI)

Sulfate is ubiquitous in groundwater, with both natural and anthropogenic sources. Sulfate reduction reactions play a significant role in mediating redox conditions and biogeochemical processes for subsurface systems. They also serve as the basis for innovative in-situ methods for groundwater remediation. An overview of sulfate reduction in subsurface environments is provided, with a specific focus on implications for groundwater remediation. A case study presenting the results of a pilot-scale ethanol injection test illustrates the advantages and difficulties associated with the use of electron-donor amendments for sulfate remediation.

Miao, Z.; Brusseau, M. L.; Carroll, Kenneth C.; Carreon-Diazconti, C.; Johnson, B.

2012-06-01T23:59:59.000Z

222

Iowa Land Recycling and Environmental Remediation Standards Act (Iowa) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Iowa Land Recycling and Environmental Remediation Standards Act Iowa Land Recycling and Environmental Remediation Standards Act (Iowa) Iowa Land Recycling and Environmental Remediation Standards Act (Iowa) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Iowa Program Type Environmental Regulations Provider Iowa Department of Natural Resources

223

WATER AS A REAGENT FOR SOIL REMEDIATION  

SciTech Connect

SRI International is conducting experiments to develop and evaluate hydrothermal extraction technology or hot water extraction (HWE) technology for remediating petroleum-contaminated soils. Most current remediation practices either fail to remove the polycyclic aromatic hydrocarbons (PAHs) found in petroleum-contaminated sites, are too costly, or require the use of organic solvents at the expense of additional contamination and with the added cost of recycling solvents. Hydrothermal extraction offers the promise of efficiently extracting PAHs and other kinds of organics from contaminated soils at moderate temperatures and pressures, using only water and inorganic salts such as carbonate. SRI has conducted experiments to measure the solubility and rate of solubilization of selected PAHs (fluoranthene, pyrene, chrysene, 9,10-dimethylanthracene) in water using SRI's hydrothermal optical cell with the addition of varying amounts of sodium carbonate to evaluate the efficiency of the technology for removing PAHs from the soil. SRI data shows a very rapid increase in solubility of PAHs with increase in temperature in the range 25-275 C. SRI also measured the rate of solubilization, which is a key factor in determining the reactor parameters. SRI results for fluoranthene, pyrene, chrysene, and 9,10-dimethylanthracene show a linear relationship between rate of solubilization and equilibrium solubility. Also, we have found the rate of solubilization of pyrene at 275 C to be 6.5 ppm/s, indicating that the equilibrium solubilization will be reached in less than 3 min at 275 C; equilibrium solubility of pyrene at 275 C is 1000 ppm. Also, pyrene and fluoranthene appear to have higher solubilities in the presence of sodium carbonate. In addition to this study, SRI studied the rate of removal of selected PAHs from spiked samples under varying conditions (temperature, pore sizes, and pH). We have found a higher removal of PAHs in the presence of sodium carbonate in both sand and bentonite systems. Also, sodium carbonate greatly reduces the possible reactor corrosion under hydrothermal conditions. Our results show that a water-to-sand ratio of at least 3:1 is required to efficiently remove PAH from soil under static conditions.

Indira S. Jayaweera; Montserrat Marti-Perez; Jordi Diaz-Ferrero; Angel Sanjurjo

2001-03-29T23:59:59.000Z

224

Versatile microbial surface-display for environmental remediation and biofuels production  

E-Print Network (OSTI)

remediation and biofuel production will be discussed. Newpollutant degradation, biofuel production and production of

Hawkes, Daniel S

2008-01-01T23:59:59.000Z

225

Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company- November 2012  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes

226

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION ( FORMER HOOKER ELECTROCHEMICAL COMPANY ) NIAGARA FALLS, NEW YORK SEP 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION (FORMER HOOKER ELECTROCHEMICAL COMPANY) L NIAGARA FALLS, NEW YORK- INTRODUCTION The Department ' of Energy (DDE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or the predecessor agencies, offices, and divisions), has reviewed the past activities of the Manhattan Engineer District (MED) and the Atomic Energy Commission (MED/AEC) at

227

CH2M HILL Plateau Remediation Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CH2M HILL Plateau Remediation Company CH2M HILL Plateau Remediation Company CH2M HILL Plateau Remediation Company The Office of Hea1th, Safety and Security's Office of Enforcement and Oversight has evaluated the facts and circumstances of a series of radiological work deficiencies at the Plutonium Finishing Plant (PFP) and the 105 K-East Reactor Facility (105KE Reactor) by CH2M HILL Plateau Remediation Company (CHPRC). The radiological work deficiencies at PFP are documented in the April 29, 2011, Department of Energy Richland Operations Office (DOE-RL) Surveillance Report S-11-SED-CHP~C-PFP-002, Planning and Execution of Radiological Work. S-11-SED-CHPRC-PFP-002 documented four examples where inadequate hazard analysis resulted in airborne radioactivity that exceeded the limits of the controlling radiological work permit.

228

Environmental Restoration Remedial Action Program records management plan  

SciTech Connect

The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan ((FOMP) DOE-RL 1989) describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document ((QARD) DOE-RL 1991), provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig.

Michael, L.E.

1991-07-01T23:59:59.000Z

229

Environmental Remediation Strategic Planning of Fukushima Nuclear Accident  

Science Conference Proceedings (OSTI)

Environmntal Remediation Assessment and other respons decision making on Environmental monitoring, experiments and assessment. Preliminary assessment to grasp the overall picture and determine critical locations, phenomena, people, etc. Using simple methods and models.

Onishi, Yasuo

2011-12-01T23:59:59.000Z

230

SBA Increases Size Standards for Waste Remediation Services &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SBA Increases Size Standards for Waste Remediation Services & SBA Increases Size Standards for Waste Remediation Services & Information/Admin Support SBA Increases Size Standards for Waste Remediation Services & Information/Admin Support December 12, 2012 - 10:22am Addthis John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization Earlier this week, the U.S. Small Business Administration announced that they have revised size definitions for small businesses in Administrative and Support & Waste Management and Remediation Services categories, saying these revisions "reflect changes in marketplace conditions." The new standards are published in the Federal Register. Increases to size standards will enable some growing small businesses in these sectors to retain their small business status; will give federal

231

Salmon Site Remedial Investigation Report - Volume I  

Office of Legacy Management (LM)

494-VOL I/REV 1 494-VOL I/REV 1 U.S. Department of Energy Nevada Operations Office E nv i r onm ent al R es t or at i on D i v i s i on N ev ada E nv i r onm ent al R es t or at i on Pr oj ect S al m on S i t e R em edi al Inv es t i gat i on R epor t Vol u m e I R ev i s i on N o. : 1 S ept em ber 1999 Approved for public release; further dissemination unlimited. This page intentionally left blank DOE/NV--494-VOL I/REV 1 SALMON SITE REMEDIAL INVESTIGATION REPORT DOE Nevada Operations Office Las Vegas, Nevada Revision No.: 1 September 1999 Approved for public release; further dissemination unlimited. Available to the public from - U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 (703) 487-4650 Available electronically at http://www.doe.gov/bridge. Available to U.S. Department of Energy and its contractors in paper from -

232

Site remediation in a virtual environment  

Science Conference Proceedings (OSTI)

We describe the process used in combining an existing computer simulation with both Virtual Reality (VR) input and output devices, and conventional visualization tools, so as to make the simulation easier to use and the results easier to understand. VR input technology facilitates direct user manipulation of three dimensional simulation parameters. Commercially available visualization tools provide a flexible environment for representing abstract scientific data. VR output technology provides a more flexible and convincing way to view the visualization results than is afforded in contemporary visualization software. The desired goal of this process is a prototype system that minimizes man-machine interface barriers, as well as enhanced control over the simulation itself, so as to maximize the use of scientific judgement and intuition. In environmental remediation, the goal is to clean up contaminants either by removing them or rendering them non-toxic. A computer model simulates water or chemical flooding to mobilize and extract hydrocarbon contaminants from a volume of saturated soil/rock. Several wells are drilled in the vicinity of the contaminant, water and/or chemicals are injected into some of the wells, and fluid containing the mobilized hydrocarbons is pumped out of the remaining wells. The user is tasked with finding well locations and pumping rates that maximize recovery of the contaminants while minimizing drilling and pumping costs to clean up the site of interest.

Bethel, W.; Jacobsen, J.; Holland, P.

1994-01-01T23:59:59.000Z

233

Volatile organic compound remedial action project  

SciTech Connect

This Environmental Assessment (EA) reviews a proposed project that is planned to reduce the levels of volatile organic compound (VOC) contaminants present in the Mound domestic water supply. The potable and industrial process water supply for Mound is presently obtained from a shallow aquifer via on-site production wells. The present levels of VOCs in the water supply drawn from the on-site wells are below the maximum contaminant levels (MCLs) permissible for drinking water under Safe Drinking Water Act (SDWA; 40 CFR 141); however, Mound has determined that remedial measures should be taken to further reduce the VOC levels. The proposed project action is the reduction of the VOC levels in the water supply using packed tower aeration (PTA). This document is intended to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969 and associated Council on Environmental Quality regulations (40 CFR parts 1500 through 1508) as implemented through U.S. Department of Energy (DOE) Order 5440.1D and supporting DOE NEPA Guidelines (52 FR 47662), as amended (54 FR 12474; 55 FR 37174), and as modified by the Secretary of Energy Notice (SEN) 15-90 and associated guidance. As required, this EA provides sufficient information on the probable environmental impacts of the proposed action and alternatives to support a DOE decision either to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact (FONSI).

NONE

1991-12-01T23:59:59.000Z

234

Least-Cost Groundwater Remediation Design Using Uncertain Hydrogeological Information  

Science Conference Proceedings (OSTI)

The research conducted by at the Research Center for Groundwater Remediation Design at the University of Vermont funded by the Department of Energy continues to focus on the implementation of a new method of including uncertainty into the optimal design of groundwater remediation systems. The uncertain parameter is the hydraulic conductivity of an aquifer. The optimization method utilized for this project is called robust optimization. The uncertainty of the hydraulic conductivity is described by a probability density function, PDF.

Pinder, George F.

1999-06-01T23:59:59.000Z

235

Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties  

Science Conference Proceedings (OSTI)

This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

Not Available

1985-03-01T23:59:59.000Z

236

Phyto remediation groundwater trends at the DOE portsmouth gaseous  

Science Conference Proceedings (OSTI)

This paper describes the progress of a phyto-remediation action being performed at the Department of Energy (DOE) Portsmouth Gaseous Diffusion Plant (PORTS) X-740 Waste Oil Handling Facility to remediate contaminated groundwater under a Resource Conservation and Recovery Act (RCRA) closure action. This action was effected by an Ohio Environmental Protection Agency (OEPA) decision to use phyto-remediation as the preferred remedy for the X-740 groundwater contamination. This remedy was recognized as a cost-effective, low-maintenance, and promising method to remediate groundwater contaminated with volatile organic compounds (VOCs), primarily trichloroethylene (TCE). During 1999, prior to the tree installation at the X-740 Phyto-remediation Area, water level measurements in the area were collected from 10 monitoring wells completed in the Gallia Formation. The Gallia is the uppermost water-bearing zone and contains most of the groundwater contamination at PORTS. During the tree installation which took place during the summer of 1999, four new Gallia monitoring wells were installed at the X-740 Area in addition to the 10 Gallia wells which had been installed in the same area during the early 1990's. Manual water level measurements were collected quarterly from these 14 Gallia monitoring wells between 1998 and 2001. These manual water level measurements were collected to monitor the combined impact of the trees on the groundwater prior to root development. Beginning in 2001, water level measurements were collected monthly during the growing season (April-September) and quarterly during the dormant season (October-March). A total of eight water level measurements were collected annually to monitor the phyto-remediation system's effect on the groundwater in the X- 740 Area. The primary function of the X-740 Phyto-remediation Area is to hydraulically prevent further spreading of the TCE plume. This process utilizes deep-rooted plants, such as poplar trees, to extract large quantities of water from the saturated zone. The focus of any phyto-remediation system is to develop a cone of depression under the entire plantation area. This cone of depression can halt migration of the contaminant plume and can create a hydraulic barrier, thereby maintaining plume capture. While a cone of depression is not yet evident at the X-740 Phyto-remediation Area, water level measurements in 2004 and 2005 differed from measurements taken in previous years, indicating that the now mature trees are influencing groundwater flow direction and gradient at the site. Water level measurements taken from 2003 through 2005 indicate a trend whereby groundwater elevations steadily decreased in the X-740 Phyto-remediation System. During this time, an average groundwater table drop of 0.30 feet was observed. Although the time for the phyto-remediation system to mature had been estimated at two to three years, these monitoring data indicate a period of four to five years for the trees to reach maturity. Although, these trends are not apparent from analysis of the potentiometric surface contours, it does appear that the head gradient across the site is higher during the spring and lower during the fall. It is not clear, however, whether this trend was initiated by the installation of the phyto-remediation system. This paper will present the groundwater data collected to date to illustrate the effects of the trees on the groundwater table. (authors)

Lewis, A.C.; Baird, D.R. [CDM, Piketon, OH (United States)

2007-07-01T23:59:59.000Z

237

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

238

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

239

Radioactive Tank Waste Remediation Focus Area. Technology summary  

SciTech Connect

In February 1991, DOE`s Office of Technology Development created the Underground Storage Tank Integrated Demonstration (UST-ID), to develop technologies for tank remediation. Tank remediation across the DOE Complex has been driven by Federal Facility Compliance Agreements with individual sites. In 1994, the DOE Office of Environmental Management created the High Level Waste Tank Remediation Focus Area (TFA; of which UST-ID is now a part) to better integrate and coordinate tank waste remediation technology development efforts. The mission of both organizations is the same: to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat, concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to both the public and regulators. The TFA has focused on four DOE locations: the Hanford Site in Richland, Washington, the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho, the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site (SRS) in Aiken, South Carolina.

NONE

1995-06-01T23:59:59.000Z

240

Remediation plan for fluorescent light fixtures containing polychlorinated biphenyls (PCBs)  

SciTech Connect

This report describes the remedial action to achieve compliance with 29 CFR 1910 Occupational Safety and Health Administration (OSHA) requirements of fluorescent light fixtures containing PCBs at K-25 site. This remedial action is called the Remediation Plan for Fluorescent Light Fixtures Containing PCBs at the K-25 Site (The Plan). The Plan specifically discusses (1) conditions of non-compliance, (2) alternative solutions, (3) recommended solution, (4) remediation plan costs, (5) corrective action, (6) disposal of PCB waste, (7) training, and (8) plan conclusions. The results from inspections by Energy Systems personnel in 2 buildings at K-25 site and statistical extension of this data to 91 selected buildings at the K-25 site indicates that there are approximately 28,000 fluorescent light fixtures containing 47,036 ballasts. Approximately 38,531 contain PCBs and 2,799 of the 38,531 ballasts are leaking PCBs. Review of reportable occurrences at K-25 for the 12 month period of September 1990 through August 1991 shows that Energy Systems personnel reported 69 ballasts leaking PCBs. Each leaking ballast is in non-compliance with 29 CFR 1910 - Table Z-1-A. The age of the K-25 facilities indicate a continued and potential increase in ballasts leaking PCBs. This report considers 4 alternative solutions for dealing with the ballasts leaking PCBs. The advantages and disadvantages of each alternative solution are discussed and ranked using cost of remediation, reduction of health risks, and compliance with OSHA as criteria.

1992-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Electrochemical arsenic remediation for rural Bangladesh  

Science Conference Proceedings (OSTI)

Arsenic in drinking water is a major public health problem threatening the lives of over 140 million people worldwide. In Bangladesh alone, up to 57 million people drink arsenic-laden water from shallow wells. ElectroChemical Arsenic Remediation(ECAR) overcomes many of the obstacles that plague current technologies and can be used affordably and on a small-scale, allowing for rapid dissemination into Bangladesh to address this arsenic crisis. In this work, ECAR was shown to effectively reduce 550 - 580 mu g=L arsenic (including both As[III]and As[V]in a 1:1 ratio) to below the WHO recommended maximum limit of 10 mu g=L in synthetic Bangladesh groundwater containing relevant concentrations of competitive ions such as phosphate, silicate, and bicarbonate. Arsenic removal capacity was found to be approximately constant within certain ranges of current density, but was found to change substantially between ranges. In order of decreasing arsenic removal capacity, the pattern was: 0.02 mA=cm2> 0.07 mA=cm2> 0.30 - 1.1 mA=cm2> 5.0 - 100 mA=cm2. Current processing time was found to effect arsenic removal capacity independent of either charge density or current density. Electrode polarization studies showed no passivation of the electrode in the tested range (up to current density 10 mA=cm2) and ruled out oxygen evolution as the cause of decreasing removal capacity with current density. Simple settling and decantation required approximately 3 days to achieve arsenic removal comparable to filtration with a 0.1 mu m membrane. X-ray Absorption Spectroscopy (XAS) showed that (1) there is no significant difference in the arsenic removal mechanism of ECAR during operation at different current densities and (2) the arsenic removal mechanism in ECAR is consistent with arsenate adsorption onto a homogenous Fe(III)oxyhydroxide similar in structure to 2-line ferrihydrite. ECAR effectively reduced high arsenic concentrations (100 - 500 mu g=L) in real Bangladesh tube well water collected from three regions to below the WHO limit of 10 mu g=L. Prototype fabrication and field testing are currently underway.

Addy, Susan Amrose

2009-01-01T23:59:59.000Z

242

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

L. O. Nelson

2003-09-01T23:59:59.000Z

243

Developing microbe-plant interactions for applications in plant-growth promotion and disease control, production of useful compounds, remediation, and carbon sequestration  

E-Print Network (OSTI)

Remediation, and Carbon Sequestration References Anderson,Remediation, and Carbon Sequestration rhizosphere byRemediation, and Carbon Sequestration Figure 1. Examples of

Bernard, S.

2009-01-01T23:59:59.000Z

244

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

-p,l-I -p,l-I . . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS D Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2 3 3 4 ii --. ELIMINATION REPORT MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions),

245

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

itI.2 -2 itI.2 -2 FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __I__,_-. - ---.. ____- .- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Pa e -5 2 2 2 4 4 4 ii ELIMINATION REPORT THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO INTRODUCTION The Oepartment of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decorrnnissioning Projects (and/or predecessor agencies, offices and divisionsa has reviewed the past activities of the Manhattan Engineer

246

Geoengineering: Plan B Remedy for Global Warming Andrew A. Lacis  

NLE Websites -- All DOE Office Websites (Extended Search)

Geoengineering: Plan B Remedy for Global Warming Geoengineering: Plan B Remedy for Global Warming Andrew A. Lacis NASA Goddard Institute for Space Studies Accelerated melting of Greenland ice is a clear indication that consequences of global warming are real and impending. The underlying causes of global warming are well enough understood, but the necessary reduction of greenhouse gases to prevent irreversible climate change is unlikely to happen before the point of no return is reached. To reverse the impending sea level rise, geoengineering counter- measures may be required to counter the current global energy imbalance due to global warming. Of the many proposed remedies, deploying aerosols within the stratosphere offers realistic prospects. Sulfur injections in the lower stratosphere would have the cooling effect of naturally occurring volcanic aerosols. Soot at

247

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

fi.q 2, fi.q 2, I: * FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 4 iii ELIMINATION REPORT WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decormnissioning Projects (and/or predecessor agencies, offices and

248

Northeast Site Area A NAPL Remediation Final Report.doc  

Office of Legacy Management (LM)

82-TAC 82-TAC U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy DE-AC13-02GJ79491 Approved for public release; distribution is unlimited. Pinellas Environmental Restoration Project Northeast Site Area A NAPL Remediation Final Report September 2003 N0065200 GJO- 2003- 482- TAC GJO- PIN 13.12.10 Pinellas Environmental Restoration Project Northeast Site Area A NAPL Remediation Final Report Young - Rainey STAR Center September 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13- 02GJ79491 Document Number N0065200 Contents DOE/Grand Junction Office Northeast Site Area A NAPL Remediation Final Report September 2003 Page iii

249

The mission of the Remediation of Mercury and Industrial  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation of Mercury and Industrial Remediation of Mercury and Industrial Contaminants Applied Field Research Initiative is to control the flux of contaminants in soil and water environments for the purpose of protecting surface water, groundwater, and ecological receptors. For more information, contact: Eric Pierce Oak Ridge National Laboratory 1 Bethel Valley Road, MS 6038 Oak Ridge, TN 37831 pierceem@ornl.gov (865) 574-9968 Kurt Gerdes DOE-EM Office of Groundwater and Soil Remediation kurt.gerdes@em.doe.gov (301) 903-7289 Sediment Biota Groundwater Flow Fluctuating Water Table Hg in building structures and rubble Waterborne mercury (mercury being transported via water being released from the facilities to the creeks) Hg currently present in the creek and sediments along the base of the creek

250

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

BETHLEHEM STEEL CORPORATION BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects P bl@ C.' , 1 & cr INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 5 iii ELIMINATION REPORT BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions), has reviewed the past activities of the Atomic Energy Commission (AEC) at the Bethlehem Steel Corporation, Lackawanna, New

251

Designation of Sites for Remedial Action - Metal Hydrides, Beverly,  

Office of Legacy Management (LM)

T: T: Designation of Sites for Remedial Action - Metal Hydrides, Beverly, MA; Bridgeport Brass, Adrian, MI and Seymour, Chicago, IL CT; National Guard Armory, 0: Joe LaGrone, Manager Oak Ridge Operations Office Based on the attached radiological survey data (Attachments 1 through 3) and an appropriate authority review, the following properties are being authorized for remedial action. It should be noted that the attached survey data are for designation purposes only and that Bechtel National, Inc. (BNI) should conduct appropriate comprehensive characterization studies to determine the extent'and magnitude of contamination on properties. Site Location Priority Former Bridgeport Brass Co. (General Motors) Adrian, MI Low Former Bridgeport Brass Co.

252

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

UNIVERSITY OF ARIZONA UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects -- --- .- _- --__ CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii - ,. -- Page 1 4 4 ..I___ - ~-___- ELIMINATION REPORT UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities of the Atomic Energy Commission (AEC)

253

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

NATIONAL BUREAU OF STANDARDS BUILDINGS NATIONAL BUREAU OF STANDARDS BUILDINGS VAN NESS STREET WASHINGTON, D.C. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - __-~---- -._.. .._ .-. .- INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status CONTENTS ELIMINATION ANALYSIS REFERENCES ii Paqe 1 4 INiRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities conducted for the Atomic Energy Commission and the Manhattan Engineer District (MED) (DOE predecessors) at

254

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

,: /A (,) i_ - z ,: /A (,) i_ - z FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR FORMERLY UTILIZED PORTIONS OF THE WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decotwnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Radiological History and Status ELIMINATION ANALYSIS Findings and Recommendation 6 REFERENCES iii Page 1 1 1 3 4 7 "..*.w..,, -. ._ ..- ". --. AUTHORITY REVIEW WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS INTRODUCTION The purpose of this review is to present information pertaining to work performed under the sponsorship of the Atomic Energy Commission (AEC) Manhattan Engineer District (MED) and the facts and circum-

255

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SENECA ARMY DEPOT SENECA ARMY DEPOT ROMULUS, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and kaste Technology. Division of Facility and Site Decommissioning Projects INTRODUCTION t3ACKGROUND CONTENTS . -Page Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 4 ii .___ -_-_..--. ._.".. ELIMINATION REPORT SENECA ARMY DEPOT ROMULUS, NEW YORK . INTRODUCTION The Department pf Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Manhattan Engineer District (MED) at Seneca Army Depot, Romulus, hew York. Based on the

256

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

\ \ ,.-c , 2 2 a. . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS SEP301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __--... -_ -._.-_- _"_-. .___.. -... .._ ..-. .-. ..--- . , ' , CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii 4 __-.I ._-----.- --- ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office

257

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

CF INDUSTRIES, INC. CF INDUSTRIES, INC. ( THE FORMER INTERNATIONAL MI NERALS AND CHEMICAL CORPORATION) BARTON, FLORIDA Department of Energy Office of Nuclear Energy. Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - - .._. ..--.. . . I."__ . - INTRODUCTION CONTENTS Page BACKGROUND Site Function Site Description Radiological. History and Status ELIMINATION ANALYSIS REFERENCES Summary of Findings ii 7 8 --..I--- - ..-___-_--.___-"-- -- ' . ELIMINATION REPORT CF INDUSTRIES, INC. (THE FORMER INTERNATIONAL MINERALS AND CHEMICAL CORPORATION) BARTOW, FLORIDA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and

258

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

ROHM & HAAS COMPANY ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLYANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS Page INTRODUCTIOk BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 2 2 2 2 3 3 iii ELIMINATION REPORT ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANXA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities of the Atomic Energy Commission (AEC) at the Rohm & Haas Company, Philadelphia, Pennsylvania. Based on a

259

OIL WELL REMEDIATION IN CLAY AND WAYNE COUNTIES, IL  

SciTech Connect

This is the second progress and final technical report of the remediation of abandoned wells in Clay and Wayne Counties in Illinois. The wells will be identified as the Routt No.3 and No.4 and the Bates Hosselton 1 and 2. Both sites have met all legal, financial and environmental requirements to drill and/or pump oil on both leases. We have also obtained all available information about both leases. All steps were taken to improve access roads, dig the necessary pits, and build the necessary firewalls. This progress and final technical report will address the remediation efforts as well as our results and conclusions.

Peter L. Dakuras; Larry Stieber; Dick Young

2003-07-09T23:59:59.000Z

260

Successful Field-Scale In Situ Thermal NAPL Remediation at the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center...

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites  

Energy.gov (U.S. Department of Energy (DOE))

This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for...

262

DOE/OR/20722-83 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

3 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE RESIDENTIAL PROPERTIES ON GROVE AVENUE AND PARKWAY...

263

Ignition Method Development and First Field Demonstration of In Situ Smouldering Remediation.  

E-Print Network (OSTI)

??Self-sustaining Treatment for Active Remediation (STAR), a smouldering combustion-based technology for remediating sites contaminated by industrial liquids, has been extensively studied in the laboratory. The… (more)

Scholes, Grant C

2013-01-01T23:59:59.000Z

264

Versatile microbial surface-display for environmental remediation and biofuels production  

E-Print Network (OSTI)

Strategies to address the mixed-waste situation require thea valuable solution for mixed-waste remediation by reducing

Hawkes, Daniel S

2008-01-01T23:59:59.000Z

265

C-1. Ground Water Remedial Technologies and Process Options C-1.1. Ground Water Extraction  

E-Print Network (OSTI)

This appendix presents detailed descriptions of the remedial technologies and process options presented in Chapter 3. Sources for these descriptions are referenced at the end of appropriate sections. Several of the remedial technologies described in this appendix have already been tested and used at Lawrence Livermore National Laboratory (LLNL) Site 300. The remedial technologies already being used in ongoing removal actions or prototype remedial actions at Site 300 are identified in the following discussion.

C. Ground; Water Extraction Wells

1999-01-01T23:59:59.000Z

266

Recommendation 170: Remedial Investigation/Feasibility Study for East Tennessee Technology Park  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Recommendation to DOE on a Remedial Investigation/Feasibility Study for East Tennessee Technology Park.

267

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program  

Energy.gov (U.S. Department of Energy (DOE))

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program (March 2012)

268

In-situ remediation system for groundwater and soils  

DOE Patents (OSTI)

The present invention relates to a system for in-situ remediation of contaminated groundwater and soil. In particular the present invention relates to stabilizing toxic metals in groundwater and soil. The United States Government has rights in this invention pursuant to Contract No. DE-AC09-89SR18035 between the US Department of Energy and Westinghouse Savannah River Company.

Corey, J.C.; Kaback, D.S.; Looney, B.B.

1991-01-01T23:59:59.000Z

269

Biogeochemical Considerations Related To The Remediation Of I-129 Plumes  

Science Conference Proceedings (OSTI)

The objectives of this report were to: provide a current state of the science of radioiodine biogeochemistry relevant to its fate and transport at the Hanford Site; conduct a review of Hanford Site data dealing with groundwater {sup 129}I; and identify critical knowledge gaps necessary for successful selection, implementation, and technical defensibility in support of remediation decisions.

Kaplan, D. I. [Savannah River Site (SRS), Aiken, SC (United States); Yeager, C. [Los Alamos National Laboratory , Los Alamos, NM (United States); Denham, M. E. [Savannah River Site (SRS), Aiken, SC (United States); Zhang, S. [Texas A& M University, Galveston, TX (United States); Xu, C. [Texas A& M University, Galveston, TX (United States); Schwehr, K. A. [Texas A& M University, Galveston, TX (United States); Li, H. P. [Texas A& M University, Galveston, TX (United States); Brinkmeyer, R. [Texas A& M University, Galveston, TX (United States); Santschi, P. H. [Texas A& M University, Galveston, TX (United States)

2012-09-24T23:59:59.000Z

270

National conference on environmental remediation science and technology: Abstracts  

Science Conference Proceedings (OSTI)

This conference was held September 8--10, 1998 in Greensboro, North Carolina. The purpose of this conference was to provide a multidisciplinary forum for exchange of state-of-the-art information on methods and site characterization technologies for environmental monitoring and remedial action planning of hazardous materials. This report contains the abstracts of sixty-one papers presented at the conference.

NONE

1998-12-31T23:59:59.000Z

271

Problems Encountered During the Radiological Remediation of Old Buildings  

SciTech Connect

With several military base closures resulting in property transfer to public use and the decommissioning of many legacy waste facilities, the opportunity for remediation of older buildings is increasing. Along with these projects, come several problems that could give the potential remediator some surprises. During the preconstruction and planning phases of the original construction activities, several generations of drawings were most likely produced for approval and permit submittal. Over the years, buildings may undergo several renovations with or without the full characterization or remediation that should be done when radioactive materials are used on a site. New walls or floors may be built over the original construction materials. Contamination in and around the building may have resulted from processes that were accepted at the time or from inadvertent activities that may have been covered up, including accidental spills. Many buildings contain hidden rooms or accesses that over time became useless and have been closed up or over, these areas may not be very obvious. When characterizing a building the effluents of the building are usually forgotten, sewer lines are important areas to investigate. All these items could cause a remediator to overlook a potentially highly contaminated area. With more of these facilities being turned over for public use, correctly characterizing these buildings will become a more common problem.

Krieger, K. V.; Schillings, D. C.

2003-02-25T23:59:59.000Z

272

Remedial Methods for Intergranular Attack of Alloy 600 Tubing, Volume 1: Plant Corrosion Morphologies and Remedial Methods, Volume 2: Additives and Test Plans for Remedial Methods, Volume 3: Boric Acid and Acetic Acid Remedial Methods  

Science Conference Proceedings (OSTI)

Intergranular attack and stress corrosion cracking of alloy 600 tubing have caused costly PWR shutdowns and even necessitated steam generator replacement. This research identified chemicals that might mitigate such degradation but showed that on-line treatment of boric acid is the best existing remedy.

1986-06-30T23:59:59.000Z

273

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

274

BIOGEOCHEMICAL CONSIDERATIONS RELATED TO THE REMEDIATION OF I-129 PLUMES  

SciTech Connect

The objectives of this report were to: provide a current state of the science of radioiodine biogeochemistry relevant to its fate and transport at the Hanford Site; conduct a review of Hanford Site data dealing with groundwater {sup 129}I; and identify critical knowledge gaps necessary for successful selection, implementation, and technical defensibility in support of remediation decisions.

Kaplan, D.; Yeager, C.; Denham, M.; Zhang, S.; Xu, C.; Schwehr, K.; Li, H.; Brinkmeyer, R.; Santschi, P.

2012-09-24T23:59:59.000Z

275

Final Hazard Categorization for the Remediation of the 116-C-3 Chemical Waste Tanks  

SciTech Connect

This final hazard categorization (FHC) document examines the hazards, identifies appropriate controls to manage the hazards, and documents the commitments for the 116-C-3 Chemical Waste Tanks Remediation Project. The remediation activities analyzed in this FHC are based on recommended treatment and disposal alternatives described in the Engineering Evaluation for the Remediation to the 116-C-3 Chemical Waste Tanks (BHI 2005e).

T. M. Blakley; W. D. Schofield

2007-09-10T23:59:59.000Z

276

Groundwater Remediation of Inorganic Constituents at Coal Combustion Product Management Sites  

Science Conference Proceedings (OSTI)

This report reviews constituents that potentially may trigger groundwater remediation at coal combustion product (CCP) management sites and briefly summarizes various in situ and ex situ remediation technologies and their applicability to treat these constituents. The report provides a more detailed discussion for one potentially promising in situ remediation technology, permeable reactive barriers (PRBs).

2006-10-29T23:59:59.000Z

277

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

Science Conference Proceedings (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

278

Installation Restoration Program. Remedial investigation report. Site 1. Fire Training Area. Volk Field Air National Guard Base, Camp Douglas, Wi. Volume 1. Final remedial investigation report  

SciTech Connect

Volume 1 of this report covers the Remedial Investigation conducted on Site 1, Fire Training Area at Volk Field Air National Guard Base. The remedial work is described and the testing conducted after remediation to insure all contamination has been removed. The study as conducted under the Air National Guard's Installation Restoration Program. Partial contents include: Meteorology; Hydrology; Soils; Water wells; Groundwater; Borings; Samplings; Chemical contamination; Migration; Decontamination.

Not Available

1990-07-01T23:59:59.000Z

279

Apparatus and method for extraction of chemicals from aquifer remediation effluent water  

DOE Patents (OSTI)

An apparatus and method for extraction of chemicals from an aquifer remediation aqueous effluent are provided. The extraction method utilizes a critical fluid for separation and recovery of chemicals employed in remediating aquifers contaminated with hazardous organic substances, and is particularly suited for separation and recovery of organic contaminants and process chemicals used in surfactant-based remediation technologies. The extraction method separates and recovers high-value chemicals from the remediation effluent and minimizes the volume of generated hazardous waste. The recovered chemicals can be recycled to the remediation process or stored for later use.

McMurtrey, Ryan D. (Idaho Falls, ID); Ginosar, Daniel M. (Idaho Falls, ID); Moor, Kenneth S. (Idaho Falls, ID); Shook, G. Michael (Idaho Falls, ID); Moses, John M. (Dedham, MA); Barker, Donna L. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

280

Method and system for extraction of chemicals from aquifer remediation effluent water  

DOE Patents (OSTI)

A method and system for extraction of chemicals from an groundwater remediation aqueous effluent are provided. The extraction method utilizes a critical fluid for separation and recovery of chemicals employed in remediating groundwater contaminated with hazardous organic substances, and is particularly suited for separation and recovery of organic contaminants and process chemicals used in surfactant-based remediation technologies. The extraction method separates and recovers high-value chemicals from the remediation effluent and minimizes the volume of generated hazardous waste. The recovered chemicals can be recycled to the remediation process or stored for later use.

McMurtrey, Ryan D. (Idaho Falls, ID); Ginosar, Daniel M. (Idaho Falls, ID); Moor, Kenneth S. (Idaho Falls, ID); Shook, G. Michael (Idaho Falls, ID); Barker, Donna L. (Idaho Falls, ID)

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Savannah River Remediation Donates $10,000 to South Carolina State Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Donates $10,000 to South Carolina State Savannah River Remediation Donates $10,000 to South Carolina State Nuclear Engineering Program Savannah River Remediation Donates $10,000 to South Carolina State Nuclear Engineering Program September 28, 2012 - 9:27am Addthis Savannah River Remediation presents a $10,000 to South Carolina State University to support its Nuclear Engineering Program. In the photo, from left: Kayla Miller, Savannah River Remediation Procurement Department and South Carolina State University 2010 graduate; Dr. John Corbitt, Acting Chairman of the South Carolina State University Board of Trustees; Dr. Cynthia Warrick, Interim South Carolina State University President; and Dave Olson, Savannah River Remediation President and Project Manager. Savannah River Remediation presents a $10,000 to South Carolina State

282

The U.S. Department of Energy Formerly Utilized Sites Remedial Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The U.S. Department of Energy Formerly Utilized Sites Remedial The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge (Waste Management Conference 2010) The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge More Documents & Publications Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP

283

Direct Push Groundwater Circulation Wells for Remediation of BTEX and Volatile Organics  

SciTech Connect

Direct push groundwater circulation wells (DP-GCW) are a promising technology for remediation of groundwater contaminated with dissolved hydrocarbons and chlorinated solvents. In these wells, groundwater is withdrawn from the formation at the bottom of the well, aerated and vapor stripped and injected back into the formation at or above the water table. Previous field studies have shown that: (a) GCWs can circulate significant volumes of groundwater; and (b) GCWs can effectively remove volatile compounds and add oxygen. In this work, we describe the development and field-testing of a system of DP-GCWs for remediation of volatile organics such as benzene, toluene, ethylbenzene, and toluene (BTEX). The GCWs were constructed with No. 20 slotted well screen (2.4 cm ID) and natural sand pack extending from 1.5 to 8.2 m below grade. Air is introduced {approximately}7.5 m below grade via 0.6 cm tubing. Approximately 15% of the vertical length of the air supply tubing is wrapped in tangled mesh polypropylene geonet drainage fabric to provide surface area for biological growth and precipitation of oxidized iron. These materials were selected to allow rapid installation of the GCWs using 3.8 cm direct push Geoprobe{reg_sign} rods, greatly reducing well installation costs. Laboratory testing of these sparged wells and computational fluid dynamics (CFD) modeling showed that these wells, although they used only about 1 L/min of air, could circulate about 1 L/min of water through the surrounding aquifer. This flow was sufficient to capture all of a flowing contaminant if the wells are sufficiently closely together, about 1 meter on center depending on the air flow rate supplied, in a line across the plume. The CFD work showed the details of this ability to capture, and also showed that unforeseen heterogeneities in the aquifer such as a gradient of permeability or a thin impermeable layer (such as a clay layer) did not prevent the system from working largely as intended. The system was tested in a petroleum contaminated aquifer near Rocky Point, NC. The contaminant plume there is approximately 10 m deep, 50 m wide and contains up to 4 {micro}g/L total BTEX and 75 {micro}g/L dissolved iron. An extensive pilot test was first performed to estimate the zone of influence for a single well. At this site an air injection rate of 1.2 L/min resulted in a water flow rate of 1 to 2 L/min based on bromide dilution tests in the GCW. The GCW increased the dissolved oxygen concentration in the discharge water to between 6 and 8 {micro}g/L and reduced contaminant concentrations to less than 20 {micro}g/L total BTEX. Monitoring results from a 73 day pilot test were then used to define the zone of influence for a single DP-GCW and to design a full scale barrier system.

Borden, R.C.; Cherry, R.S.

2000-09-30T23:59:59.000Z

284

Direct Push Groundwater Circulation Wells for Remediation of BTEX and Volatile Organics  

SciTech Connect

Direct push groundwater circulation wells (DP-GCW) are a promising technology for remediation of groundwater contaminated with dissolved hydrocarbons and chlorinated solvents. In these wells, groundwater is withdrawn from the formation at the bottom of the well, aerated and vapor stripped and injected back into the formation at or above the water table. Previous field studies have shown that: (a) GCWs can circulate significant volumes of groundwater; and (b) GCWs can effectively remove volatile compounds and add oxygen. In this work, we describe the development and field-testing of a system of DP-GCWs for remediation of volatile organics such as benzene, toluene, ethylbenzene, and toluene (BTEX). The GCWs were constructed with No. 20 slotted well screen (2.4 cm ID) and natural sand pack extending from 1.5 to 8.2 m below grade. Air is introduced ~7.5 m below grade via 0.6 cm tubing. Approximately 15% of the vertical length of the air supply tubing is wrapped in tangled mesh polypropylene geonet drainage fabric to provide surface area for biological growth and precipitation of oxidized iron. These materials were selected to allow rapid installation of the GCWs using 3.8 cm direct push Geoprobe® rods, greatly reducing well installation costs. Laboratory testing of these sparged wells and computational fluid dynamics (CFD) modeling showed that these wells, although they used only about 1 L/min of air, could circulate about 1 L/min of water through the surrounding aquifer. This flow was sufficient to capture all of a flowing contaminant if the wells are sufficiently closely together, about 1 meter on center depending on the air flow rate supplied, in a line across the plume. The CFD work showed the details of this ability to capture, and also showed that unforeseen heterogeneities in the aquifer such as a gradient of permeability or a thin impermeable layer (such as a clay layer) did not prevent the system from working largely as intended. The system was tested in a petroleum contaminated aquifer near Rocky Point, NC. The contaminant plume there is approximately 10 m deep, 50 m wide and contains up to 4 µg/L total BTEX and 75 µg/L dissolved iron. An extensive pilot test was first performed to estimate the zone of influence for a single well. At this site an air injection rate of 1.2 L/min resulted in a water flow rate of 1 to 2 L/min based on bromide dilution tests in the GCW. The GCW increased the dissolved oxygen concentration in the discharge water to between 6 and 8 µg/L and reduced contaminant concentrations to less than 20 µg/L total BTEX. Monitoring results from a 73 day pilot test were then used to define the zone of influence for a single DP-GCW and to design a full scale barrier system.

Borden, R. E.; Cherry, Robert Stephen

2000-09-01T23:59:59.000Z

285

Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Embrittlement Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group Workshop Augusta, GA, August 30, 2005 Funding and Duration * Timeline - Project start date: 7/20/05 - Project end date: 7/19/09 - Percent complete: 0.1% * Budget: Total project funding: 300k/yr * DOE share: 75% * Contractor share: 25% * Barriers - Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) - Assessment of hydrogen compatibility of the existing natural gas pipeline system for transporting hydrogen - Suitable steels, and/or coatings, or other materials to provide safe and reliable hydrogen transport and reduced capital cost 2 Team and Collaborators 3 * Industrial Partners: SECAT

286

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ..- .-- ---- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Page 1 L 2 2 3 3 5 5 - --__( -_..... _ .._ ELIMINATION REPORT THE FORMER SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK L -rc c INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Atomic Energy

287

NE-24 Unlverslty of Chicayo Remedial Action Plan  

Office of Legacy Management (LM)

(YJ 4 tlsj .?I2 (YJ 4 tlsj .?I2 416 17 1983 NE-24 Unlverslty of Chicayo Remedial Action Plan 22&d 7 IA +-- E. I.. Keller, Director Technical Services Division Oak Ridge Operations Ufflce In response to your memorandum dated July 29, 1983, the Field Task Proposal/Agreement (FTP/A) received frw Aryonne National Laboratory (ANL) appears to be satisfactory, and this office concurs in the use of ANL to provide the decontamination effort as noted in the FTP/A. The final decontaminatton report should Include the data needed for certiff- cation of the cleanup and any contamination left In place, e.g., sewer lines should be so documented in the permanent records of the University as well as the certification documents and reports. The remedial action to be conducted appears to be clearly InsIgnifIcant from an environmental

288

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

289

Final Report Northeast Site Area B NAPL Remediation Project  

Office of Legacy Management (LM)

Northeast Site Area B Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Office of Legacy Management DOE M/1457 2007 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank DOE-LM/1457-2007 Final Report Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado

290

Oak Ridge Operations Formerly Utilized Sites Remedial Action Program  

Office of Legacy Management (LM)

IC77GLg /'-Oi. SEP 20 1982 IC77GLg /'-Oi. SEP 20 1982 10-05-04B-001 Deportment of Energy Oak Ridge Operations Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 PRELIMINARY ENGINEERING EVALUATION OF REMEDIAL ACTION ALTERNATIVES BAYO CANYON SITE, LOS ALAMOS, NEW MEXICO SEPTEMBER 1982 Bechtel Job 14501 Bechtel National, Inc. Nuclear Fuel Operations LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use

291

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT,  

Office of Legacy Management (LM)

REPORT, REPORT, FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET, NEW YORK, AND DUNKIRK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste.Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES * 1 2 2 2 3 4 4 . . . 111 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET. NEW YORK, AND DUNKIRK, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and

292

Remedial Alternative Selection for the F Area Tank Farm,  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Availability: Notice of Availability: Explanation of Significant Difference for Incorporating Tanks 18 and 19 into Revision 1 Interim Record Of Decision Remedial Alternative Selection for the F Area Tank Farm, Waste Tanks 17 and 20 at the Savannah River Site The Explanation of Significant Difference for Incorporating Tanks 18 and 19 into Revision 1 Interim Record of Decision Remedial Alternative Selection for the F Area Tank Farm, (hereafter referred to as the Tank 18 and 19 ESD) is being issued by the U.S. Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the U.S. Environmental Protection Agency - Region 4 (EPA), and South Carolina Department of Health and Environmental Control (SCDHEC). The Tank 18 and 19 ESD modifies

293

In-situ groundwater remediation by selective colloid mobilization  

DOE Patents (OSTI)

An in-situ groundwater remediation pump and treat technique effective for reclamation of aquifers that have been contaminated with a mixed, metal-containing waste, which promotes selective mobilization of metal oxide colloids with a cationic surfactant, preferably a quaternary alkylammonium surfactant, without significantly reducing formation permeability that often accompanies large-scale colloid dispersion, thus increasing the efficiency of the remediation effort by enhancing the capture of strongly sorbing contaminants associated with the oxide phases. The resulting suspension can be separated from the bulk solution with controlled pH adjustments to destabilize the oxide colloids, and a clear supernatant which results that can be recycled through the injection well without further waste treatment.

Seaman, John C. (New Ellenton, SC); Bertch, Paul M. (Aiken, SC)

1998-01-01T23:59:59.000Z

294

ENVIRONMENTAL ASSESSMENT OF No REMEDIAL ACTION AT THE INACTIVE URANIFEROUS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 206 7 206 REV. 0 ENVIRONMENTAL ASSESSMENT OF No REMEDIAL ACTION AT THE INACTIVE URANIFEROUS LIGNITE ASHING SITES AT BELFIELD AND BOWMAN. NORTH DAKOTA United States Department of Energy Uranium Mill Tailings Remedial Action Project June 1997 INTENDED FOR PUBLIC RELEASE This report has been reproduced from the best available copy. Available in paper copy and microfiche Number of pages in this report: 5 8 DOE and DOE contractors can obtain copies of this report from: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 (61 5) 576-8401 This report is publicly available from: National Technical Information Service Department of Commerce 5285 Port Royai Road Springfield, VA 22161 (703) 487-4650 DOE/EA-1206 REV. 0 ENVIRONMENTAL ASSESSMENT

295

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIkNATION REPORT  

Office of Legacy Management (LM)

ELIkNATION REPORT ELIkNATION REPORT .FOR WESTINGHOUSE .ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Deconrmissioning Projects l CONTENTS INTRODUCTICIN BACKGROUND. Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2' 4 4 iii ELIMINATION~REPORT WESTINGHOUSE ATOMIC POWER,DEVELOPMENT,PLANT: EAST PITTSBURGH PLANT: 'FOREST HILLS ,PITTS.BURGH, PENNSYLVANIA INTRODUCTION The Department of,Energy (DOE), Office of Nuclear Energy, Office of 'Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and

296

In Situ Biological Uranium Remediation within a Highly Contaminated Aquifer  

NLE Websites -- All DOE Office Websites (Extended Search)

In Situ Biological Uranium Remediation In Situ Biological Uranium Remediation within a Highly Contaminated Aquifer Matthew Ginder-Vogel1, Wei-Min Wu1, Jack Carley2, Phillip Jardine2, Scott Fendorf1 and Craig Criddle1 1Stanford University, Stanford, CA 2Oak Ridge National Laboratory, Oak Ridge, TN Microbial Respiration Figure 1. Uranium(VI) reduction is driven by microbial respiration resulting in the precipitation of uraninite. Uranium contamination of ground and surface waters has been detected at numerous sites throughout the world, including agricultural evaporation ponds (1), U.S. Department of Energy nuclear weapons manufacturing areas, and mine tailings sites (2). In oxygen-containing groundwater, uranium is generally found in the hexavalent oxidation state (3,4), which is a relatively soluble chemical form. As U(VI) is transported through

297

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM - ELIMINATION REPORT FOR  

Office of Legacy Management (LM)

- - ELIMINATION REPORT FOR . UNIVERSITY OF NEVADA MACKAY SCHOOL OF MINES RENO, NEVADA s,d k I",, ici ;3J(, i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 , Page . 1 2 2 2' 3 3 iii The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities conducted under contract to the Atomic Energy Conrmission (AEC) at the University of Nevada, Mackay

298

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY (NOW GENERAL CHEMICAL CORPORATION) NORTH CLAYMONT, DELAWARE Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioni.ng Projects " .___ . ..-. --.- ------ ". CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 1 1 2 2 2 4 ii INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Manhattan Engineer -- District (MED) and the Atomic Energy Commission (AEC) at the Allied Chemical

299

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

AMOCO CHEMICAL COMPANY AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS Summary of Findings REFERENCES ii --.. ---_ .l.- _-__II__-_. -. Page 1 7 7 ' c . ELIMINATION REPORT AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions), has reviewed the past activities conducted on behalf of the Atomic

300

Supporting soil remediation at Fernald by electron beam methods  

SciTech Connect

Electron beam techniques have been used to characterize uranium-contaminated soils at the Fernald Site, Ohio. The major uranium phases have been identified by analytical electron microscopy (AEM) as uranyl phosphate (autunite), uranium oxide (uraninite), and uranium phosphite [U(PO{sub 3}){sub 4}]. Luminescence and X-ray absorption spectroscopy incorrectly identified uranium oxide hydrate (schoepite) as the major phase in Fernald soils. The solubilities of schoepite and autunite are very different, so a solubility-dependent remediation method selected for schoepite will not be effective for removing autunite. AEM is the only technique capable of precisely identifying unknown submicron phases. The uranium phosphite has been found predominantly at the incinerator site at Fernald. This phase has not been removed successfully by any of the chemical remediation technologies. We suggest that an alternative physical extraction procedure be applied to remove this phase.

Buck, E.C.; Brown, N.R.; Dietz, N.L.; Cunnane, J.C.

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Using GIS to Identify Remediation Areas in Landfills  

Science Conference Proceedings (OSTI)

This paper reports the use of GIS mapping software—ArcMap and ArcInfo Workstation—by the Idaho National Engineering and Environmental Laboratory (INEEL) as a non-intrusive method of locating and characterizing radioactive waste in a 97-acre landfill to aid in planning cleanup efforts. The fine-scale techniques and methods used offer potential application for other burial sites for which hazards indicate a non-intrusive approach. By converting many boxes of paper shipping records in multiple formats into a relational database linked to spatial data, the INEEL has related the paper history to our current GIS technologies and spatial data layers. The wide breadth of GIS techniques and tools quickly display areas in need of remediation as well as evaluate methods of remediation for specific areas as the site characterization is better understood and early assumptions are refined.

Linda A.Tedrow

2004-08-01T23:59:59.000Z

302

Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex  

SciTech Connect

With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE`s Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories.

1995-08-01T23:59:59.000Z

303

Least-Cost Groundwater Remediation Using Uncertain Hydrogeological Information  

SciTech Connect

The design of groundwater remediation pump-and-treat well networks under aquifer parameter measurement uncertainty can be addressed using an optimal-design strategy based upon the concept of robust optimization. The robust-optimization approach allows for the admission of design alternatives that do not satisfy all design constraints. However in the selection process the algorithm penalizes such selections based upon the number of constraints violated. The result is a design which balances the importance of reliability with overall project cost. The robust-optimization method has been applied to the problem of groundwater plume containment and risk-based groundwater remediation design. Designs dedicated to groundwater-plume containment assure that the contaminant plume will not extend beyond a prespecified perimeter. Inwardly directed groundwater velocity must be achieved along this perimeter. The outer-approximation optimization technique in combination with a groundwater flow model ( PTC) is used to solve this optimal-design problem.

George F. Pinder; Karen Ricciardi; George P. Karatzas

2001-11-28T23:59:59.000Z

304

FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT FOR FORMER CARPENTER STEEL COMPANY; 101 WEST BERN STREET; READING, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Former Carpenter Steel Company CONTENTS INTRODUCTION ........................... 1 BACKGROUND ............................ 1 Site Function ......................... Site Description. ....................... : Radiological History and Status ................ 2 ELIMINATION ANALYSIS ....................... 3 REFERENCES ............................ 4 Elimination Report Former Carpenter Steel Company INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, has reviewed the past activities of the Manhattan Engineer District (MEO) and

305

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

< < .. ,:. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR JESSOP STEEL COMPANY; 500 GREEN STREET: WASHINGTON, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Jessop Steel Company CONTENTS INTRODUCTION ...................... .'. .... 1 BACKGROUND ............................. 1 Site Function Site Description : : : : : : : .................................... : Radiological History and Status ................. 2 ELIMINATION ANALYSIS ........................ 3 REFERENCES .............................. 4 Elimination Report Jessop Steel Company 1 INTRODUCTION The Department of Energy (DOE)., Office of Environmental Restoration, has reviewed the past activities of the Manhattan Engineer District (MED) and

306

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

REMEDIAL ACTION PROGRAM ELIMINATION REPORT SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE WEST CHESTER,~PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Office of Eastern Area Programs . . . CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS . . . . . . . . . . . . . . . . . . . REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . m . . 1 . . 1 . . 2 . . 2 I . . ELIMINATIO N REPO R T SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE W EST CHESTER, PENNSYLVANIA

307

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

Science Conference Proceedings (OSTI)

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE /NV

2001-04-05T23:59:59.000Z

308

Handbook of Remedial Alternatives for MGP Sites with Contaminated Sediments  

Science Conference Proceedings (OSTI)

Contaminated sediment management is a rapidly developing and maturing field of environmental engineering, with an expansive set of publicly available documents in the scientific and engineering literature. This Handbook of Remedial Alternatives for MGP Sites with Contaminated Sediments provides a compendium of the state-of-the-practice from the literature, and augments it with practical case-study experience from the field. It is intended to provide MGP site-managers with a single source document for eva...

2007-02-26T23:59:59.000Z

309

Remediation of Embedded Piping: Trojan Nuclear Plant Decommissioning Experience  

Science Conference Proceedings (OSTI)

Characterization, decontamination, survey, and/or removal of contaminated embedded piping can have a substantial financial impact on decommissioning projects, depending on the project approach. This report presents a discussion of the Trojan Embedded Pipe Remediation Project (EPRP) activities, including categorization and characterization of affected piping, modeling for the proposed contamination acceptance criteria, and evaluations of various decontamination and survey techniques. The report also descr...

2000-10-19T23:59:59.000Z

310

Tank waste remediation system nuclear criticality safety program management review  

SciTech Connect

This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

BRADY RAAP, M.C.

1999-06-24T23:59:59.000Z

311

Solvent Extraction for Remediation of Manufactured Gas Plant Sites  

Science Conference Proceedings (OSTI)

EPRI has assessed the feasibility of using a solvent extraction process to remove coal tar from the subsurface or to treat contaminated soil excavated from manufactured gas plant (MGP) sites. The assessment indicates that in situ solvent extraction may recover a significant amount of tar from the subsurface within a reasonable timeframe, provided subsurface conditions are conducive to process implementation. This work will help utilities searching for cost-effective technologies to remediate MGP sites.

1993-02-18T23:59:59.000Z

312

Acoustically enhanced remediation of contaminated soil and ground water  

SciTech Connect

This program systematically evaluates the use of acoustic excitation fields (AEFs) to increase fluid and contaminant extraction rates from a wide range of unconsolidated soils. Successful completion of this program will result in a commercially-viable, advanced in-situ remediation technology that will significantly reduce clean-up times and costs. This technology should have wide applicability since it is envisioned to augment existing remediation technologies, such as traditional pump and treat and soil vapor extraction, not replace them. The overall program has three phases: Phase 1--laboratory scale parametric investigation; Phase 2--technology scaling study; Phase 3--field demonstration. Phase 1 of the program, corresponding to this period of performance, has as its primary objectives to provide a laboratory-scale proof of concept, and to fully characterize the effects of AEFs on fluid and contaminant extraction rates in a wide variety of soil types. The laboratory measurements of the soil transport properties and process parameters will be used in a computer model of the enhanced remediation process. A Technology Merit and Trade Study will complete Phase 1.

Iovenitti, J.L.; Rynne, T.M.; Spencer, J.W. Jr.

1994-12-31T23:59:59.000Z

313

FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND  

Office of Legacy Management (LM)

bE8IQM CRITERIA FOR bE8IQM CRITERIA FOR r FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND r 8URPLUS FACIL~TIES MANAOEMENT PROQRAM [SFMPI FEBRUARY 1886 i r s o i - o o - ~ c - o l - 1 ~ R e v . 1 DESIGN CRITERIA FOR FORMERLY UTILIZED Sf TES REMEDIAL' ACTION PROGAM ( PUSRAPL AND . . -- SURPLUS F A C I L I T I E S UANAGEMENT PROGRAM ( SFMP ( I S S U E D FOR CLIENT APPROVAL) SF proved by: 2-24-86 D a t e T e c h n i c a l Services D i v i s i o n A p p r o v e d by: 2-24-86 D a t e C o n s t r u c t i o n a n d E n g i n e e r i n g Oak R i d g e O p e r a t i o n s O f f ice 14SOl-00-PC-01 Rev. 1 PREFACE T O DESIGN CRITERIA These design criteria have been written in a generic form that sunmarizes criteria applicabl'e for remedial action and long-tern ranasenent activities associated with t h e radioactive wastes at the FOSRAP *and SFflP sites. Site-specific information i

314

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

WINCHESTER ENGINEERING AND ANALYTICAL CENTER WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects . . I . I C O N T E N T S IN T R O D U C T IO N B A C K G R O U N D S i te F u n c ti o n S i te D e s c ri p ti o n R a d i o l o g i c a l H i s to ry a n d S ta tu s E L IM IN A T IO N A N A L Y S IS R E F E R E N C E S - P a g e 1 2 2 2 3 5 5 i i i -..- - ELIMINATION REPORT WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSETTS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action, Division of Remedial Action Projects (and/or predecessor agencies, offices and divisions,)

315

Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project  

SciTech Connect

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

Not Available

1989-09-01T23:59:59.000Z

316

EVALUATION OF REMEDIATION TECHNOLOGIES FOR PLUTONIUM CONTAMINATED SOIL  

SciTech Connect

Soils contaminated with radionuclides are an environmental concern at most Department of Energy (DOE) sites. Clean up efforts at many of these sites are ongoing using conventional remediation techniques. These remediation techniques are often expensive and may not achieve desired soil volume reduction. Several studies using alternative remediation techniques have been performed on plutonium-contaminated soils from the Nevada Test Site. Results to date exhibit less than encouraging results, but these processes were often not fully optimized, and other approaches are possible. Clemson University and teaming partner Waste Policy Institute, through a cooperative agreement with the National Environmental Technologies Laboratory, are assisting the Nevada Test Site (NTS) in re-evaluating technologies that have the potential of reducing the volume of plutonium contaminated soil. This efforts includes (1) a through literature review and summary of (a) NTS soil characterization and (b) volume reduction treatment technologies applied to plutonium-contaminated NTS soils, (2) an interactive workshop for vendors, representatives from DOE sites and end-users, and (3) bench scale demonstration of applicable vendor technologies at the Clemson Environmental Technologies Laboratory.

Hoeffner, S. L.; Navratil, J. D.; Torrao, G.; Smalley, R.

2002-02-25T23:59:59.000Z

317

Hanford site tank waste remediation system programmatic environmental review report  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmental Impact Statement (EIS) Record of Decision (ROD) to perform future National Environmental Policy Act (NEPA) analysis at key points in the Program. Each review will address the potential impacts that new information may have on the environmental impacts presented in the TWRS EIS and support an assessment of whether DOE`s plans for remediating the tank waste are still pursuing the appropriate plan for remediation or whether adjustments to the program are needed. In response to this commitment, DOE prepared a Supplement Analysis (SA) to support the first of these reevaluations. Subsequent to the completion of the SA, the Phase IB negotiations process with private contractors resulted in several changes to the planned approach. These changes along with other new information regarding the TWRS Program have potential implications for Phase 1 and Phase 2 of tank waste retrieval and waste storage and/or disposal that may influence the environmental impacts of the Phased Implementation alternative. This report focuses on identifying those potential environmental impacts that may require NEPA analysis prior to authorization to begin facility construction and operations.

Haass, C.C.

1998-09-03T23:59:59.000Z

318

Remedial evaluation of a UST site impacted with chlorinated hydrocarbons  

Science Conference Proceedings (OSTI)

During assessment and remedial planning of an underground storage tank (UST) site, it was discovered that chlorinated hydrocarbons were present. A network of selected wells were sampled for analysis of halogenated volatile organics and volatile organic compounds to determine the extent of constituents not traditionally associated with refined petroleum motor fuel products. The constituents detected included vinyl chloride, tetrachloroethylene (PCE), bromodichloromethane, and 2-chloroethylvinyl ether. These analytical data were evaluated as to what effect the nonpetroleum hydrocarbon constituents may have on the remedial approach utilized the site hydrogeologic properties to its advantage and took into consideration the residential nature of the impacted area. The geometry of the dissolved plume is very flat and broad, emanating from the site and extending downgradient under a residential area situated in a transmissive sand unit. Ground-water pumping was proposed from two areas of the dissolved plume including five wells pumping at a combined rate of 55 gallons per minute (gpm) at a downgradient position, and two wells on-site to remove free product and highly impacted ground water. Also, to assist in remediation of the dissolved plume and to control vapors, a bioventing system was proposed throughout the plume area.

Ilgner, B.; Rainey, E. (Geraghty and Miller, Inc., Oak Ridge, TN (United States)); Ball, M.; Schutt, M.

1993-10-01T23:59:59.000Z

319

In Situ Remediation Integrated Program: FY 1994 program summary  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) established the Office of Technology Development (EM-50) as an element of the Office of Environmental Management (EM) in November 1989. In an effort to focus resources and address priority needs, EM-50 introduced the concept of integrated programs (IPs) and integrated demonstrations (IDs). The In Situ Remediation Integrated Program (ISR IP) focuses research and development on the in-place treatment of contaminated environmental media, such as soil and groundwater, and the containment of contaminants to prevent the contaminants from spreading through the environment. Using in situ remediation technologies to clean up DOE sites minimizes adverse health effects on workers and the public by reducing contact exposure. The technologies also reduce cleanup costs by orders of magnitude. This report summarizes project work conducted in FY 1994 under the ISR IP in three major areas: treatment (bioremediation), treatment (physical/chemical), and containment technologies. Buried waste, contaminated soils and groundwater, and containerized waste are all candidates for in situ remediation. Contaminants include radioactive waste, volatile and nonvolatile organics, heavy metals, nitrates, and explosive materials.

NONE

1995-04-01T23:59:59.000Z

320

Long term performance of different radon remedial methods in Sweden  

E-Print Network (OSTI)

The object of this project was to investigate the long time effectiveness of different radon remedial methods. The ten years project started 1991. From start the investigation comprised of 105 dwellings (91 single-family houses and 14 flats in multi-family buildings). In all of the dwellings remedial measures were carried out in the eighties. Before and immediately after the reduction the local measured the radon concentrations. New measurements of the radon concentrations have been made every third year; in 1991, 1994, 1997 and in 2000. Twelve different radon remedial methods and method combinations were used. The radon sources were building materials as well as sub-soils. In all of the dwellings the radon concentrations were measured by nuclear track films during 3 months (January-March) measurements and in half of them the air change rates by passive tracer gas methods. The results of the 2000 and the 1991 (within brackets) studies showed that the radon concentration was up to 200 Bq/m sup 3 in 54 (54) sin...

Clavensjoe, B

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and 355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Summary The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water

322

DOE/OR/20722-88 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

88 88 . Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 Wayne, New Jersey March 1989 Bechtel National, Inc. DOE/OR/20722-88 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 WAYNE, NEW JERSEY MARCH 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 BY R. M. Howard Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 TABLE OF CONTENTS Paqe 1.0 2.0 3.0 4.0 Introduction 1.1 Background 1.2 History Remedial Action Guidelines 5 Remedial Action 3.1 Cleanup/Decontamination Activities 3.2 Contamination Control During the Cleanup 8 8 11 Post-Remedial-Action Sampling 13

323

In Situ Bioremediation Interim Remedial Action Report, Test Area North, Operable Unit 1-07B  

E-Print Network (OSTI)

This Interim Remedial Action Report is for the in situ bioremediation remedial component of Operable Unit 1-07B at Test Area North at the Idaho National Laboratory. Under U.S. Environmental Protection Agency guidance, an interim report for a long-term groundwater remedial action provides a chronology of events and a description of the remedial action facilities, systems, components, and operating documents that lead to a declaration that the system is operational and functional. It is the conclusion of this report that the in situ bioremediation remedial component includes the infrastructure and programs necessary to achieve the objectives of the in situ bioremediation remedial component for contaminated groundwater in the vicinity of the TSF-05 well; therefore, it can be deemed operational and functional. iii ivCONTENTS ABSTRACT.................................................................................................................................................iii

Unit -b; Prepared For The

2009-01-01T23:59:59.000Z

324

Remediation progress at the Iron Mountain Mine Superfund site, California. Information Circular/1991  

Science Conference Proceedings (OSTI)

The report was prepared by the U.S. Bureau of Mines to present a brief history of the listing of Iron Mountain Mine as a Superfund site on the National Priorities List (NPL) and subsequent remedial actions. The mine area is located on 4,400 acres near Redding, CA, and includes underground workings, an open pit area, waste rock dumps, and tailings piles. The property involves multiple sources of acid mine drainage (AMD) that are high in copper, zinc, and cadmium. The selected remedial actions, based on the Record of Decision of 1986, would partially cap the richmond mineralized zone to reduce infiltration of clean water, divert clean surface waters away from contaminated areas, fill surface subsidence areas, and enlarge the Spring Creek debris dam to provide increased surge capacity. Site remediation efforts at Iron Mountain are well into the remedial design-remedial action phase. Details of activities and designs of remedial elements are presented, and future activities, discussed.

Biggs, F.R.

1991-01-01T23:59:59.000Z

325

DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

DOE/OFVZ1949402 DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-9%OR21949 Post-Remedial Action Report for the Former Baker Brothers Site Toledd, Ohio . February 1997 . . DOWORRl949-402 POST-REMEDIAL ACTION REPORT FOR THE REMEDIAL ACTION ATTHE FORMER BAKER BROTHERS SITE TOLEDO. OHIO FEBRUARY 1997 . United States Department of Energy I OakRidgeOpcrationsOfficc Under Contract No. DE-AC059 I OR2 1949 BY Bcchtcl National, Inc. . . : ; '.' OakRldnc.Tc~~~.- ~--~-' -------m . . Be&cl Job No. 14501 CQNTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..~~................................................................................ iv TABLES . . . . . . . ..i.................................................................................................................................

326

Remedial System Performance Improvement for the 200-ZP-1_PW-1 Operable Units at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Review Report: Feasibility Study Strategies and Remedial System Performance Improvement for the 200- ZP-1/PW-1 Operable Units at Hanford Prepared for Office of Groundwater and Soil Remediation Office of Environmental Management February 9, 2007 i EXECUTIVE SUMMARY At the request of the U.S. Department of Energy, Headquarters' Office of Environmental Management, the Office of Groundwater and Soil Remediation (EM-22), performed a Remediation System Evaluation (RSE) of the 200-ZP-1/PW-1 groundwater pump and treat (P&T) system, as well as the vadose zone Soil Vapor Extraction (SVE) system at the Hanford

327

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

328

Review of the Hanford Site CH2M Hill Plateau Remediation Company...  

NLE Websites -- All DOE Office Websites (Extended Search)

general goals. CHPRC is the prime contractor for the environmental cleanup of the Hanford Site, including remediation of the Central Plateau and groundwater across the...

329

A Comparison of Popular Remedial Technologies for Petroleum Contaminated Soils from Leaking Underground Storage Tanks  

E-Print Network (OSTI)

1992. Bioremediation of Petroleum Contaminated Sites. BocaApplied Bioremediation of Petroleum Hydrocarbons. Columbus:Eve. 1998. Remediation of Petroleum Contaminated Soils. Boca

Kujat, Jonathon D.

1999-01-01T23:59:59.000Z

330

Versatile microbial surface-display for environmental remediation and biofuels production  

E-Print Network (OSTI)

engineering microbes for biofuels production. Science 315,xenobiotics remediation and biofuels production. TargetP. putida JS444 E. coli Biofuels Production Cellobiose

Hawkes, Daniel S

2008-01-01T23:59:59.000Z

331

Audit Report APPROVAL OF TITLE X REMEDIATION CLAIMS, WR-B-99...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and codified as Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites (10 CFR 765). This regulation allowed for mining companies to submit...

332

Remedial Action Report for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

R. P. Wells

2007-08-15T23:59:59.000Z

333

Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases (Rhode Island)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations establish procedures for the investigation and remediation of contamination resulting from the unpermitted release of hazardous materials. The regulations aim to protect water...

334

FORMERLY USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY  

Office of Legacy Management (LM)

USED SITES USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY FOR ALBA CRAFT LABORATORY OXFORD, OHIO October 1, 1992 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL RESTORATION Designation Summary Alba Craft Laboratory. Oxford CONTENTS INTRODUCTION .......... . . ..................... 1 BACKGROUND Site Function ......................... Site Description ..................... 1 Owner History ................. .. 2 Radiological History and Status............ 2 Authority Review .................... .. 3 DESIGNATION DETERMINATION ........ ....... 3 REFERENCES . ............ .... . 3 Designation Summary Alba Craft Laboratory, Oxford INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, has reviewed the past activities of the Atomic Energy Commission (AEC) at the

335

Adaptive management: a paradigm for remediation of public facilities  

SciTech Connect

Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

Janecky, David R [Los Alamos National Laboratory; Whicker, Jeffrey J [Los Alamos National Laboratory; Doerr, Ted B [NON LANL

2009-01-01T23:59:59.000Z

336

Activities of HPS standards committee in environmental remediation  

SciTech Connect

The Health Physics Society (HPS) develops American National Standards in the area of radiation protection using methods approved by the American National Standards Institute (ANSI). Two of its sections, Environmental Health Physics and Contamination Limits, have ongoing standards development which are important to some environmental remediation efforts. This paper describes the role of the HPS standards process and indicates particular standards under development which will be of interest to the reader. In addition, the authors solicit readers to participate in the voluntary standards process by either joining active working groups (WG) or suggesting appropriate and relevant topics which should be placed into the standards process.

Stencel, J.R. [Princeton Univ., NJ (United States). Plasma Physics Lab.; Chen, S.Y. [Argonne National Lab., IL (United States)

1994-12-31T23:59:59.000Z

337

Enhancement of in situ microbial remediation of aquifers  

DOE Patents (OSTI)

Methods are provided for remediating subsurface areas contaminated by toxic organic compounds. An innocuous oil, such as vegetable oil, mineral oil, or other immiscible organic liquid, is introduced into the contaminated area and permitted to move therethrough. The oil concentrates or strips the organic contaminants, such that the concentration of the contaminants is reduced and such contaminants are available to be either pumped out of the subsurface area or metabolized by microorganisms. Microorganisms may be introduced into the contaminated area to effect bioremediation of the contamination. The methods may be adapted to deliver microorganisms, enzymes, nutrients and electron donors to subsurface zones contaminated by nitrate in order to stimulate or enhance denitrification.

Fredrickson, James K. (Kennewick, WA); Brockman, Fred J. (Kennewick, WA); Streile, Gary P. (both or Richland, WA); Cary, John W. (both or Richland, WA); McBride, John F. (Carrboro, NC)

1993-01-01T23:59:59.000Z

338

Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report  

SciTech Connect

In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

NONE

1996-06-01T23:59:59.000Z

339

Uranium Mill Tailings Remedial Action Project environmental protection implementation plan  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

Not Available

1994-10-01T23:59:59.000Z

340

Enhanced Remedial Amendment Delivery through Fluid Viscosity Modifications: Experiments and numerical simulations  

SciTech Connect

Abstract Heterogeneity is often encountered in subsurface contamination characterization and remediation. Low-permeability zones are typically bypassed when remedial fluids are injected into subsurface heterogeneous aquifer systems. Therefore, contaminants in the bypassed areas may not be contacted by the amendments in the remedial fluid, which may significantly prolong the remediation operations. Laboratory experiments and numerical studies have been conducted to develop the Mobility-Controlled Flood (MCF) technology for subsurface remediation and to demonstrate the capability of this technology in enhancing the remedial amendments delivery to the lower permeability zones in heterogeneous systems. Xanthan gum, a bio-polymer, was used to modify the viscosity of the amendment-containing remedial solutions. Sodium mono-phosphate and surfactant were the remedial amendment used in this work. The enhanced delivery of the amendments was demonstrated in two-dimensional (2-D) flow cell experiments, packed with heterogeneous systems. The impact of polymer concentration, fluid injection rate, and permeability contract in the heterogeneous systems has been studied. The Subsurface Transport over Multiple Phases (STOMP) simulator was modified to include polymer-induced shear thinning effects. Shear rates of polymer solutions were computed from pore-water velocities using a relationship proposed in the literature. Viscosity data were subsequently obtained from empirical viscosity-shear rate relationships derived from laboratory data. The experimental and simulation results clearly show that the MCF technology is capable of enhancing the delivery of remedial amendments to subsurface lower permeability zones. The enhanced delivery significantly improved the NAPL removal from these zones and the sweeping efficiency on a heterogeneous system was remarkably increased when a polymer fluid was applied. MCF technology is also able to stabilize the fluid displacing front when there is a density difference between the fluids. The modified STOMP simulator was able to predict the experimental observed fluid displacing behavior. The simulator may be used to predict the subsurface remediation performance when a shear thinning fluid is used to remediate a heterogeneous system.

Zhong, Lirong; Oostrom, Martinus; Wietsma, Thomas W.; Covert, Matthew A.

2008-07-29T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Tank Waste Remediation System decisions and risk assessment  

SciTech Connect

The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize the highly radioactive Hanford Site tank wastes and encapsulated cesium and strontium materials in an environmentally sound, safe, and cost effective manner. Additionally, the TWRS conducts, as part of this mission, resolution of safety issues associated with the wastes within the 177 underground radioactive waste tanks. Systems engineering principles are being applied to determine the functions and establish requirements necessary for accomplishing the TWRS mission (DOE 1994 draft). This systematic evaluation of the TWRS program has identified key decisions that must be executed to establish mission scope, determine requirements, or select a technical solution for accomplishing identified functions and requirements. Key decisions identified through the systematic evaluation of the TWRS mission are presented in this document. Potential alternative solutions to each decision are discussed. After-discussion and evaluation of each decision with effected stakeholder groups, the US Department of Energy (DOE) will select a solution from the identified alternatives for implementation. In order to proceed with the development and execution of the tank waste remediation program, the DOE has adopted a planning basis for several of these decisions, until a formal basis is established. The planning bases adopted by the DOE is continuing to be discussed with stakeholder groups to establish consensus for proceeding with proposed actions. Technical and programmatic risks associated with the planning basis adopted by the DOE are discussed.

Johnson, M.E.

1994-09-01T23:59:59.000Z

342

Analysis of SPR salt cavern remedial leach program 2013.  

SciTech Connect

The storage caverns of the US Strategic Petroleum Reserve (SPR) exhibit creep behavior resulting in reduction of storage capacity over time. Maintenance of oil storage capacity requires periodic controlled leaching named remedial leach. The 30 MMB sale in summer 2011 provided space available to facilitate leaching operations. The objective of this report is to present the results and analyses of remedial leach activity at the SPR following the 2011 sale until mid-January 2013. This report focuses on caverns BH101, BH104, WH105 and WH106. Three of the four hanging strings were damaged resulting in deviations from normal leach patterns; however, the deviations did not affect the immediate geomechanical stability of the caverns. Significant leaching occurred in the toes of the caverns likely decreasing the number of available drawdowns until P/D ratio criteria are met. SANSMIC shows good agreement with sonar data and reasonably predicted the location and size of the enhanced leaching region resulting from string breakage.

Weber, Paula D.; Gutierrez, Karen A.; Lord, David L.; Rudeen, David Keith [GRAM, Inc., Albuquerque, NM

2013-09-01T23:59:59.000Z

343

Technique for rapid establishment of American lotus in remediation efforts  

Science Conference Proceedings (OSTI)

A technique for increasing the establishment rate of American lotus (Nelumbo lutea) and simplifying planting was developed as part of a pond remediation project. Lotus propagation techniques typically require scarification of the seed, germination in heated water, and planting in nursery containers. Then mature (~ 1 yr) nursery-grown stock is transferred to planting site or scarified seed are broadcast applied. Mature plants should grow more quickly, but can be sensitive to handling, require more time to plant, and cost more. Scarified seeds are easier to plant and inexpensive, but have a lag time in growth, can fail to germinate, and can be difficult to site precisely. We developed an intermediate technique using small burlap bags that makes planting easier, provides greater germination success, and avoids lag time in growth. Data on survival and growth from experiments using mature stock, scarified seeds, and bag lotus demonstrate that bag lotus grow rapidly in a variety of conditions, have a high survival rate, can be processed and planted easily and quickly, and are very suitable for a variety of remediation projects

Ryon, Michael G [ORNL; Fortner, Allison M [ORNL; Goins, Kenneth N [ORNL; Jett, Robert T [ORNL; McCracken, Kitty [ORNL; Morris, Gail Wright [ORNL; Riazzi, Adam [Lincoln County HS, Hamlin WV; Roy, W Kelly [ORNL

2013-01-01T23:59:59.000Z

344

Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan  

SciTech Connect

The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

NONE

1981-05-01T23:59:59.000Z

345

Review of the Vortec soil remediation demonstration program  

Science Conference Proceedings (OSTI)

The principal objective of the METC/Vortec program is to develop and demonstrate the effectiveness of the Vortec CMS in remediating soils contaminated with hazardous materials and/or low levels of radionuclides. To convincingly demonstrate the CMS`s capability, a Demonstration Plant will be constructed and operated at a DOE site that has a need for the remediation of contamination soil. The following objectives will be met during the program: (1) establish the glass chemistry requirements to achieve vitrification of contaminated soils found at the selected DOE site; (2) complete the design of a fully integrated soil vitrification demonstration plant with a capacity to process 25 TPD of soil; (3) establish the cost of a fully integrated soil demonstration plant with a capacity to process 25 TPD of soil; (4) construct and operate a fully integrated demonstration plant; (5) analyze all influent and effluent streams to establish the partitioning of contaminants and to demonstrate compliance with all applicable health, safety, and environmental requirements; (6) demonstrate that the CMS technology has the capability to produce a vitrified product that will immobilize the hazardous and radionuclide materials consistent with the needs of the specific DOE waste repositories.

Patten, J.S.

1994-12-31T23:59:59.000Z

346

Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography  

Science Conference Proceedings (OSTI)

This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

Owen, P.T.; Michelson, D.C.; Knox, N.P.

1985-09-01T23:59:59.000Z

347

Collinearity and Two-Step Estimation of Sample Selection Models: Problems, Origins, and Remedies  

Science Conference Proceedings (OSTI)

This paper investigates the origins of the collinearity problems encountered in the two-step estimation method for sample selection models. The analysis reveals several critical misconceptions and deficiencies in the literature. Remedies to the ... Keywords: Heckman's two-step method, Monte Carlo experiment, collinearity problem, remedy, sample selection, wage equation

Siu Fai Leung; Shihti Yu

2000-06-01T23:59:59.000Z

348

Petroleum-contaminated groundwater remediation systems design: A data envelopment analysis based approach  

Science Conference Proceedings (OSTI)

Groundwater contamination is one of important environmental problems at petroleum-related sites, which is causing more and more attention. It can bring serious adverse effects on the environment and human health. Design of a groundwater remediation system ... Keywords: Cross-efficiency, Data envelopment analysis, Groundwater remediation systems design, Super-efficiency

Xiaodong Zhang; Guo H. Huang; Qianguo Lin; Hui Yu

2009-04-01T23:59:59.000Z

349

Groundwater and Soil Remediation Guidelines for Nuclear Power Plants: Public Edition  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Groundwater and Soil Remediation Guidelines provides the nuclear power industry with technical guidance for evaluating the need for and timing of remediation of soil and/or groundwater contamination from onsite leaks, spills, or inadvertent releases to a) prevent migration of licensed material off-site and b) minimize decommissioning impacts.

2011-07-08T23:59:59.000Z

350

Evaluation of In Situ Remedial Technologies for Sites Contaminated With Hydrocarbons  

Science Conference Proceedings (OSTI)

Utility managers are faced at times with decision making regarding remediation of sites contaminated with petroleum hydrocarbons. This report, which presents the results of a survey of the literature on established and emerging technologies for in situ remediation of petroleum hydrocarbons, is intended to support such decision making.

1998-04-20T23:59:59.000Z

351

Remediation of Gas Holders at MGP Sites: A Manual of Practice  

Science Conference Proceedings (OSTI)

This Manual of Practice has been developed jointly by EPRI and GRI (formerly the Gas Research Institute) to assist utility members in choosing strategies for remediating former manufactured gas plant (MGP) sites. Specifically, the manual addresses former gas holders, a prominent feature of MGP facilities and frequently a focus of remediation efforts at these sites.

1999-12-16T23:59:59.000Z

352

Tank waste remediation system retrieval and disposal mission initial updated baseline summary  

Science Conference Proceedings (OSTI)

This document provides a summary of the proposed Tank Waste Remediation System Retrieval and Disposal Mission Initial Updated Baseline (scope, schedule, and cost) developed to demonstrate the Tank Waste Remediation System contractor`s Readiness-to-Proceed in support of the Phase 1B mission.

Swita, W.R.

1998-01-05T23:59:59.000Z

353

Environmental remediation 1991: ``Cleaning up the environment for the 21st Century``. Proceedings  

Science Conference Proceedings (OSTI)

This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases.

Wood, D.E. [ed.] [Westinghouse Hanford Co., Richland, WA (United States)

1991-12-31T23:59:59.000Z

354

The Office of Groundwater & Soil Remediation Fiscal Year 2011 Research & Development Program  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy’s (DOE) Office of Groundwater and Soil Remediation supports applied research and technology development (AR&TD) for remediation of environments contaminated by legacy nuclear waste. The program centers on delivering advanced scientific approaches and technologies from highly-leveraged, strategic investments that maximize impact to reduce risk and life-cycle cleanup costs. The current groundwater and soil remediation program consists of four applied programmatic areas: • Deep Vadose Zone – Applied Field Research Initiative • Attenuation Based Remedies – Applied Field Research Initiative • Remediation of Mercury and Industrial Contaminants – Applied Field Research Initiative • Advanced Simulation Capability for Environmental Management. This paper provides an overview of the applied programmatic areas, fiscal year 11 accomplishments, and their near-term technical direction.

Gerdes, Kurt D.; Chamberlain, Grover S.; Aylward, R. S.; Cercy, Mike; Seitz, Roger; Ramirez, Rosa; Skubal, Karen L.; Marble, Justin; Wellman, Dawn M.; Bunn, Amoret L.; Liang, Liyuan; Pierce, Eric M.

2011-12-02T23:59:59.000Z

355

The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites  

Energy.gov (U.S. Department of Energy (DOE))

The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites

356

Use of Advanced Oxidation and Aerobic Degradation for Remediation of Various Hydrocarbon Contaminates  

SciTech Connect

Western Research Institute in conjunction with Sierra West Consultants, Inc., Tetra Tech, Inc., and the U.S. Department of Energy conducted laboratory and field studies to test different approaches to enhance degradation of hydrocarbons and associated contaminants. WRI in conjunction with Sierra West Consultants, Inc., conducted a laboratory and field study for using ozone to treat a site contaminated with MTBE and other hydrocarbons. Results from this study demonstrate that a TOD test can be used to resolve the O{sub 3} dosage problem by establishing a site-specific benchmark dosage for field ozone applications. The follow-up testing of the laboratory samples provided indications that intrinsic biodegradation could be stimulated by adding oxygen. Laboratory studies also suggests that O3 dosage in the full-scale field implementation could be dialed lower than stoichiometrically designed to eliminate the formation of Cr(VI). WRI conducted a study involving a series of different ISCO oxidant applications to diesel-contaminated soil and determined the effects on enhancing biodegradation to degrade the residual hydrocarbons. Soils treated with permanganate followed by nutrients and with persulfate followed by nutrients resulted in the largest decrease in TPH. The possible intermediates and conditions formed from NOM and TPH oxidation by permanganate and activated persulfate favors microbial TPH degrading activity. A 'passive-oxidation' method using microbial fuel cell (MFC) technology was conducted by WRI in conjunction with Tetra Tech, Inc., to degrade MTBE in groundwater. These experiments have demonstrated that a working MFC (i.e., one generating power) could be established in the laboratory using contaminated site water or buffered media inoculated with site water and spiked with MTBE, benzene, or toluene. Electrochemical methods were studied by WRI with goal of utilizing low voltage and amperage electrical sources for 'geo-oxidation' of organic contaminants. The results from a study with TCE contaminated-clay indicate that electrochemically inducing reductive dechlorination of TCE in a saturated matrix may offer an effective and viable alternative to remediation TCE and other contaminants with potential of being reduced. Another study focused on steel wool oxidation to electrochemically increase population of hydrocarbon-degrading denitrifying bacteria. Significantly larger denitrifying activity was observed in the cathode chamber of a treatment unit setup like an MFC with steel wool as the anode. This enhanced nitrate reduction could be due to direct electron utilization by denitrifying bacteria on the cathode, thereby stimulating microbial denitrification or a combination of electron transfer directly to NO{sub 3}{sup -} and electron transfer to nitrate reducing bacteria, which may serve as a type of bio-catalyst on the cathode for nitrate reduction. Overall, the studies conducted under Task 72 demonstrated different innovative methods to enhance petroleum hydrocarbon degradation and associated contaminants.

Paul Fallgren

2009-03-06T23:59:59.000Z

357

UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

F. a% F. a% .~~~~~~":~,~~~~,~. .-+smiii"-l ," ^.-. _ _I ,a ,' ~, *p2 - QRkl~ oR,o~ DOE/OR/20722- 29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 CI c F c F F c CI c c F P RADIOLOGICAL SURVEY OF THE ALBANY RESEARCH CENTER Albany, O regon Bechtel National, inc. Advanced Technology Division L- ..^___ ~. _ .._.. -.~~_-- ._ ._.. .._ .^.". January 1985 Technical information Center Office of Scientific and Technical Information U.S. Department of Energy LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied,

358

Remedial Action Certification Docket - Sodium Reactor Experiment (SRE)  

Office of Legacy Management (LM)

c~-?i-- c~-?i-- I ,3-l Remedial Action Certification Docket - Sodium Reactor Experiment (SRE) .Complex and the Hot Cave Facility (Bldg. 003), Santa Susana ,Fie!d Laboratory, Chatsworth, California ..:'..~::Yerlette Gatl in, MA-232 I am attaching for entry into the Public Document Room, one copy of the N -23 subject documentat ion. These documents are the backup data for the certification that the facilfties are radiologically acceptable for b- unrestricted use as noted in the certification statement published in the &aney Federal Register. Inasmuch as the certification for unrestricted use is 9/2(/85 being published in the Federal Register, it is prudent that the attached documentation also be available to the public. These documents should be retained In accordance with DOE Order 1324.2--disposal schedule 25.

359

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

CONTENTS CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Pa e -5 1 : 2 2 4 ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND, VIRGINIA INTROUUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of the Atomic Energy Commission (AEC) at the former Virginia-Carolina Chemical Corporation, Richmond, Virginia. On the basis of historical information, DOE has determined that any radioactive material potentially remaining from these activities would be insignificant in terms of both its quantity and the hazard it would

360

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

. . CONTENTS INTROOUCTION BACKGROUND Site Function Site Description Radiological History,and Status ELIMINATION ANALYSIS REFERENCES 9 1 1 2 2 2 4 ii ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND. VIRGINIA INTROLJUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of ,Remedial Action and Waste Technology, Division of Facility and Site Deconunissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of the Atomic Energy Carmission (AEC) at the former Virginia-Carolina Chemical Corporation, Richmond, Virginia. On the basis of historical information, DOE has determined that any radioactive material potentially remaining from these activities would oe insignificant in terms of both its quantity and the hazard it would

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The Hanford site tank waste remediation system technical strategy  

SciTech Connect

The US Department of Energy`s Hanford Site, located in southeastern Washington State, has the most diverse and largest amount of radioactive tank the United States. High-level radioactive waste has been stored in large underground tanks since 1944. Approximately 230,000 m{sup 3} (61 Mgal) of caustic liquids, slurries, saltcakes, and sludges have accumulated in 177 tanks. In addition, significant amounts of {sup 90}S and {sup 137}Cs were removed from the tank waste, converted to salts, doubly encapsulated in metal containers, and stored in water basins. A Tank Waste Remediation System Program was established by the US DOE Energy in 1991 to safely manage and immobilize these wastes for permanent disposal of the high-level waste fraction in a geologic repository. The technical strategy to manage and dispose of these wastes has been revised and successfully negotiated with the regulatory agencies.

Wodrich, D.D.

1994-04-01T23:59:59.000Z

362

Microscopic characterization of radionuclide contaminated soils to assist remediation efforts  

Science Conference Proceedings (OSTI)

A combination of optical, scanning, and analytical electron microscopies have been used to describe the nature of radionuclide contamination at several sites. These investigations were conducted to provide information for remediation efforts. This technique has been used successfully with uranium-contaminated soils from Fernald, OH, and Portsmouth, OH, thorium-contaminated soil from a plant in Tennessee, plutonium-contamination sand from Johnston Island in the Pacific Ocean, and incinerator ash from Los Alamos, NM. Selecting the most suitable method for cleaning a particular site is difficult if the nature of the contamination is not understood. Microscopic characterization allows the most appropriate method to be selected for removing the contamination and can show the effect a particular method is having on the soil. A method of sample preparation has been developed that allows direct comparison of scanning electron microscopy (SEM) and transmission electron microscopy (TEM) images, enabling characterization of TEM samples to be more representative of the bulk sample.

Buck, E.C.; Brown, N.R.; Dietz, N.L.; Fortner, J.A.; Bates, J.K.

1994-11-01T23:59:59.000Z

363

Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

Vollmer, A.T.

1993-10-01T23:59:59.000Z

364

Tank waste remediation system systems engineering management plan  

Science Conference Proceedings (OSTI)

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

365

Tank waste remediation system functions and requirements document  

Science Conference Proceedings (OSTI)

This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.

Carpenter, K.E

1996-10-03T23:59:59.000Z

366

Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists  

Science Conference Proceedings (OSTI)

The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

Levine, M.B.; Sigmon, C.F.

1989-09-29T23:59:59.000Z

367

DOE/EA-1155 Uranium Mill Tailing Remedial Action Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55 55 Uranium Mill Tailing Remedial Action Project Environmental Assessment of Ground- Water Compliance Activities At the Uranium Mill Tailings Site Spook, Wyoming February 1997 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office This page intentionally blank : illegible Portions of tbis DISCLAIMER document may be in electronic image products. Images are produced fiom the best available original dOClMXlf?IlL DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liabili- ty or responsibility for the accuracy, completeness,

368

Armored Enzyme Nanoparticles for Remediation of Subsurface Contaminants  

Science Conference Proceedings (OSTI)

The remediation of subsurface contaminants is a critical problem for the Department of Energy, other government agencies, and our nation. Severe contamination of soil and groundwater exists at several DOE sites due to various methods of intentional and unintentional release. Given the difficulties involved in conventional removal or separation processes, it is vital to develop methods to transform contaminants and contaminated earth/water to reduce risks to human health and the environment. Transformation of the contaminants themselves may involve conversion to other immobile species that do not migrate into well water or surface waters, as is proposed for metals and radionuclides; or degradation to harmless molecules, as is desired for organic contaminants. Transformation of contaminated earth (as opposed to the contaminants themselves) may entail reductions in volume or release of bound contaminants for remediation. Research at Rensselaer focused on the development of haloalkane dehalogenase as a critical enzyme in the dehalogenation of contaminated materials (ultimately trichloroethylene and related pollutants). A combination of bioinformatic investigation and experimental work was performed. The bioinformatics was focused on identifying a range of dehalogenase enzymes that could be obtained from the known proteomes of major microorganisms. This work identified several candidate enzymes that could be obtained through relatively straightforward gene cloning and expression approaches. The experimental work focused on the isolation of haloalkane dehalogenase from a Xanthobacter species followed by incorporating the enzyme into silicates to form biocatalytic silicates. These are the precursors of SENs. At the conclusion of the study, dehalogenase was incorporated into SENs, although the loading was low. This work supported a single Ph.D. student (Ms. Philippa Reeder) for two years. The project ended prior to her being able to perform substantive bioinformatics efforts that would identify more promising dehalogenase enzymes. The SEN synthesis, however, was demonstrated to be partially successful with dehalogenases. Further work would provide optimized dehalogenases in SENs for use in pollution remission.

Jonathan S. Dordick; Jay Grate; Jungbae Kim

2007-02-19T23:59:59.000Z

369

MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD  

SciTech Connect

In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

KRONVALL CM

2011-01-14T23:59:59.000Z

370

Clean Slate Environmental Remediation DSA for 10 CFR 830 Compliance  

Science Conference Proceedings (OSTI)

Clean Slate Sites II and III are scheduled for environmental remediation (ER) to remove elevated levels of radionuclides in soil. These sites are contaminated with legacy remains of non-nuclear yield nuclear weapons experiments at the Nevada Test Site, that involved high explosive, fissile, and related materials. The sites may also hold unexploded ordnance (UXO) from military training activities in the area over the intervening years. Regulation 10 CFR 830 (Ref. 1) identifies DOE-STD-1120-98 (Ref. 2) and 29 CFR 1910.120 (Ref. 3) as the safe harbor methodologies for performing these remediation operations. Of these methodologies, DOE-STD-1120-98 has been superseded by DOE-STD-1120-2005 (Ref. 4). The project adopted DOE-STD-1120-2005, which includes an approach for ER projects, in combination with 29 CFR 1910.120, as the basis documents for preparing the documented safety analysis (DSA). To securely implement the safe harbor methodologies, we applied DOE-STD-1027-92 (Ref. 5) and DOE-STD-3009-94 (Ref. 6), as needed, to develop a robust hazard classification and hazards analysis that addresses non-standard hazards such as radionuclides and UXO. The hazard analyses provided the basis for identifying Technical Safety Requirements (TSR) level controls. The DOE-STD-1186-2004 (Ref. 7) methodology showed that some controls warranted elevation to Specific Administrative Control (SAC) status. In addition to the Evaluation Guideline (EG) of DOE-STD-3009-94, we also applied the DOE G 420.1 (Ref. 8) annual, radiological dose, siting criterion to define a controlled area around the operation to protect the maximally exposed offsite individual (MOI).

James L. Traynor, Stephen L. Nicolosi, Michael L. Space, Louis F. Restrepo

2006-08-01T23:59:59.000Z

371

MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD  

SciTech Connect

In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

KRONVALL CM

2011-01-14T23:59:59.000Z

372

Scientific Opportunity to Reduce Risk in Groundwater and Soil Remediation  

Science Conference Proceedings (OSTI)

In this report, we start by examining previous efforts at linking science and DOE EM research with cleanup activities. Many of these efforts were initiated by creating science and technology roadmaps. A recurring feature of successfully implementing these roadmaps into EM applied research efforts and successful cleanup is the focus on integration. Such integration takes many forms, ranging from combining information generated by various scientific disciplines, to providing technical expertise to facilitate successful application of novel technology, to bringing the resources and creativity of many to address the common goal of moving EM cleanup forward. Successful projects identify and focus research efforts on addressing the problems and challenges that are causing “failure” in actual cleanup activities. In this way, basic and applied science resources are used strategically to address the particular unknowns that are barriers to cleanup. The brief descriptions of the Office of Science basic (Environmental Remediation Science Program [ERSP]) and EM’s applied (Groundwater and Soil Remediation Program) research programs in subsurface science provide context to the five “crosscutting” themes that have been developed in this strategic planning effort. To address these challenges and opportunities, a tiered systematic approach is proposed that leverages basic science investments with new applied research investments from the DOE Office of Engineering and Technology within the framework of the identified basic science and applied research crosscutting themes. These themes are evident in the initial portfolio of initiatives in the EM groundwater and soil cleanup multi-year program plan. As stated in a companion document for tank waste processing (Bredt et al. 2008), in addition to achieving its mission, DOE EM is experiencing a fundamental shift in philosophy from driving to closure to enabling the long-term needs of DOE and the nation.

Pierce, Eric M.; Freshley, Mark D.; Hubbard, Susan S.; Looney, Brian B.; Zachara, John M.; Liang, Liyuan; Lesmes, D.; Chamberlain, G. M.; Skubal, Karen L.; Adams, V.; Denham, Miles E.; Wellman, Dawn M.

2009-08-25T23:59:59.000Z

373

Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5  

SciTech Connect

This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

1984-09-01T23:59:59.000Z

374

An economic decision framework using modeling for improving aquifer remediation design  

Science Conference Proceedings (OSTI)

Reducing cost is a critical challenge facing environmental remediation today. One of the most effective ways of reducing costs is to improve decision-making. This can range from choosing more cost- effective remediation alternatives (for example, determining whether a groundwater contamination plume should be remediated or not) to improving data collection (for example, determining when data collection should stoop). Uncertainty in site conditions presents a major challenge for effective decision-making. We present a framework for increasing the effectiveness of remedial design decision-making at groundwater contamination sites where there is uncertainty in many parameters that affect remediation design. The objective is to provide an easy-to-use economic framework for making remediation decisions. The presented framework is used to 1) select the best remedial design from a suite of possible ones, 2) estimate if additional data collection is cost-effective, and 3) determine the most important parameters to be sampled. The framework is developed by combining elements from Latin-Hypercube simulation of contaminant transport, economic risk-cost-benefit analysis, and Regional Sensitivity Analysis (RSA).

James, B.R.; Gwo, J.P.; Toran, L.E.

1995-11-01T23:59:59.000Z

375

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

376

Y-12 Plant Remedial Action technology logic diagram. Volume I: Technology evaluation  

Science Conference Proceedings (OSTI)

The Y-12 Plant Remedial Action Program addresses remediation of the contaminated groundwater, surface water and soil in the following areas located on the Oak Ridge Reservation: Chestnut Ridge, Bear Creek Valley, the Upper and Lower East Fork Popular Creek Watersheds, CAPCA 1, which includes several areas in which remediation has been completed, and CAPCA 2, which includes dense nonaqueous phase liquid wells and a storage facility. There are many facilities within these areas that are contaminated by uranium, mercury, organics, and other materials. This Technology Logic Diagram identifies possible remediation technologies that can be applied to the soil, water, and contaminants for characterization, treatment, and waste management technology options are supplemented by identification of possible robotics or automation technologies. These would facilitate the cleanup effort by improving safety, of remediation, improving the final remediation product, or decreasing the remediation cost. The Technology Logic Diagram was prepared by a diverse group of more than 35 scientists and engineers from across the Oak Ridge Reservation. Most are specialists in the areas of their contributions. 22 refs., 25 tabs.

NONE

1994-09-01T23:59:59.000Z

377

Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9  

SciTech Connect

The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

1988-09-01T23:59:59.000Z

378

Lessons Learned from V-Tank Waste Remediation Activities at the Idaho National Laboratory  

SciTech Connect

The purpose of this paper is to discuss major activities and lessons learned from remediation of the V-tank waste at Idaho National Laboratory's (INL's) Test Area North (TAN) complex. Remediation activities involved the on-site treatment, solidification and disposal of over 61,000 L (16,000 gal) of radioactively hazardous V-tank waste. In July, 2006, over 98% of the V-tank waste was disposed of at the Idaho CERCLA Disposal Facility (ICDF). Disposal was accomplished using the three 38,000-L (10,000-gal) V-tanks that had stored most of the V-tank waste for over 30 years. Included in V-Tank remediation was the removal of approximately 7,650 m{sup 3} (10,000 yd{sup 3}) of contaminated soil. Plans are to treat the remaining V-tank waste off-site in early 2007, with the treated residual also disposed of at the ICDF. Disposal of the treated V-tank waste at ICDF marked a major step in completing remediation of the TAN V-tanks, a task begun in 1999 when the original Record of Decision (ROD) was published. Over this time, there have been a number of stops and starts associated with remediating this waste. Although many of these stops and starts were unavoidable, there are a number of lessons learned for the V-tank remediation that could help prevent unnecessary expenses and schedule delays in future remediation activities within the Department of Energy (DOE) complex. This paper identifies major and minor lessons learned from V-tank waste remediation efforts - those that resulted in unnecessary delays/expenses, as well as those areas that accelerated V-tank remediation efforts. (authors)

Farnsworth, R.K.; Jessmore, J.J.; Eaton, D.L.; McDannel, G.E.; Sloan, P.A.; Jantz, A.E.; Tyson, D.R. [CH2M-Washington Group Idaho -Idaho Cleanup Project-a, Idaho Falls, ID (United States); Burt, B.T. [E2 Consulting Engineers, Idaho Falls ID (United States)

2007-07-01T23:59:59.000Z

379

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes  

SciTech Connect

This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

NONE

1997-09-01T23:59:59.000Z

380

Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9  

SciTech Connect

The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

1988-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

L. Davison

2009-06-30T23:59:59.000Z

382

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

Lee Davison

2009-06-30T23:59:59.000Z

383

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

384

Operable Unit 3-13, Group 3, Other Surface Soils (Phase I) Remedial Action Report  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 3, Other Surface Soils, Phase I sites at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The 10 sites addressed in this report were defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for these 10 sites have been accomplished and are hereafter considered No Action or No Further Action sites.

L. Davison

2007-07-31T23:59:59.000Z

385

GROUNDWATER RADIOIODINE: PREVALENCE, BIOGEOCHEMISTRY, AND POTENTIAL REMEDIAL APPROACHES  

SciTech Connect

Iodine-129 ({sup 129}I) has not received as much attention in basic and applied research as other contaminants associated with DOE plumes. These other contaminants, such as uranium, plutonium, strontium, and technetium are more widespread and exist at more DOE facilities. Yet, at the Hanford Site and the Savannah River Site {sup 129}I occurs in groundwater at concentrations significantly above the primary drinking water standard and there is no accepted method for treating it, other than pump-and-treat systems. With the potential arrival of a 'Nuclear Renaissance', new nuclear power facilities will be creating additional {sup 129}I waste at a rate of 1 Ci/gigawatts energy produced. If all 22 proposed nuclear power facilities in the U.S. get approved, they will produce more {sup 129}I waste in seven years than presently exists at the two facilities containing the largest {sup 129}I inventories, ({approx}146 Ci {sup 129}I at the Hanford Site and the Savannah River Site). Hence, there is an important need to fully understand {sup 129}I behavior in the environment to clean up existing plumes and to support the expected future expansion of nuclear power production. {sup 129}I is among the key risk drivers at all DOE nuclear disposal facilities where {sup 129}I is buried, because of its long half-life (16 million years), high toxicity (90% of the body's iodine accumulates in the thyroid), high inventory, and perceived high mobility in the subsurface environment. Another important reason that {sup 129}I is a key risk driver is that there is the uncertainty regarding its biogeochemical fate and transport in the environment. We typically can define {sup 129}I mass balance and flux at sites, but can not accurately predict its response to changes in the environment. This uncertainty is in part responsible for the low drinking water standard, 1 pCi/L {sup 129}I, and the low permissible inventory limits (Ci) at the Savannah River Site, Hanford Site, and the former Yucca Mountain disposal facilities. The objectives of this report are to: (1) compile the background information necessary to understand behavior of {sup 129}I in the environment, (2) discuss sustainable remediation approaches to {sup 129}I contaminated groundwater, and (3) identify areas of research that will facilitate remediation of {sup 129}I contaminated areas on DOE sites. Lines of scientific inquiry that would significantly advance the goals of basic and applied research programs for accelerating {sup 129}I environmental remediation and reducing uncertainty associated with disposal of {sup 129}I waste are: (1) Evaluation of amendments or other treatment systems that can sequester subsurface groundwater {sup 129}I. (2) Develop analytical techniques for measurement of total {sup 129}I that eliminate the necessity of collecting and shipping large samples of groundwater. (3) Develop and evaluate ways to manipulate areas with organic-rich soil, such as wetlands, to maximize {sup 129}I sorption, minimizing releases during anoxic conditions. (4) Develop analytical techniques that can identify the various {sup 129}I species in the subsurface aqueous and solid phases at ambient concentrations and under ambient conditions. (5) Identify the mechanisms and factors controlling iodine-natural organic matter interactions at appropriate environmental concentrations. (6) Understand the biological processes that transform iodine species throughout different compartments of subsurface waste sites and the role that these processes have on {sup 129}I flux.

Denham, M.; Kaplan, D.; Yeager, C.

2009-09-23T23:59:59.000Z

386

Decontamination Technologies, Task 3, Urban Remediation and Response Project  

SciTech Connect

In the aftermath of a Radiological Dispersal Device (RDD, also known as a dirty bomb) it will be necessary to remediate the site including building exteriors and interiors, equipment, pavement, vehicles, personal items etc. Remediation will remove or reduce radioactive contamination from the area using a combination of removing and disposing of many assets (including possible demolition of buildings), decontaminating and returning to service other assets, and fixing in place or leaving in place contamination that is deemed 'acceptable'. The later will require setting acceptable dose standards, which will require negotiation with all involved parties and a balance of risk and cost to benefit. To accomplish the first two, disposal or decontamination, a combination of technologies will be deployed that can be loosely classified as: Decontamination; Equipment removal and size reduction; and Demolition. This report will deal only with the decontamination technologies that will be used to return assets to service or to reduce waste disposal. It will not discuss demolition, size reduction or removal technologies or equipment (e.g., backhoe mounted rams, rock splitter, paving breakers and chipping hammers, etc.). As defined by the DOE (1994), decontamination is removal of radiological contamination from the surfaces of facilities and equipment. Expertise in this field comes primarily from the operation and decommissioning of DOE and commercial nuclear facilities as well as a small amount of ongoing research and development closely related to RDD decontamination. Information related to decontamination of fields, buildings, and public spaces resulting from the Goiania and Chernobyl incidents were also reviewed and provide some meaningful insight into decontamination at major urban areas. In order to proceed with decontamination, the item being processed needs to have an intrinsic value that exceeds the cost of the cleaning and justifies the exposure of any workers during the decontamination process(es). In the case of an entire building, the value may be obvious; it's costly to replace the structure. For a smaller item such as a vehicle or painting, the cost versus benefit of decontamination needs to be evaluated. This will be determined on a case by case basis and again is beyond the scope of this report, although some thoughts on decontamination of unique, personal and high value items are given. But, this is clearly an area that starting discussions and negotiations early on will greatly benefit both the economics and timeliness of the clean up. In addition, high value assets might benefit from pre-event protection such as protective coatings or HEPA filtered rooms to prevent contaminated outside air from entering the room (e.g., an art museum).

Heiser,J.; Sullivan, T.

2009-06-30T23:59:59.000Z

387

Hybrid Tower Study: Volume 3: Phase 3 -- Scale Model Development and Full-Scale Tests  

Science Conference Proceedings (OSTI)

Hybrid towers maximize the power transmission efficiency of the available space whenever there is the need to have both ac and dc lines in the same corridor. This study developed calculation techniques and design rules for the placement of conductors energized with HVAC and HVDC circuits on the same towers. Significantly, the study did not identify any hybrid interactions that would prevent the successful operation of a hybrid corridor or hybrid tower transmission line.

1994-06-29T23:59:59.000Z

388

Employment of wireless sensor networks for full-scale ship application  

Science Conference Proceedings (OSTI)

In this study, basic experiments regarding the wireless sensor network were conducted on a 3,000-ton-class training ship as the first step in applying the ubiquitous technology to a real ship. Various application fields of the technology in terms of ... Keywords: WSN (wireless sensor network), monitoring, ship, ubiquitous, zigbee

Bu-Geun Paik; Seong-Rak Cho; Beom-Jin Park; Dongkon Lee; Jong-Hwui Yun; Byung-Dueg Bae

2007-12-01T23:59:59.000Z

389

Using Resistance Heating to Create Full-Scale API RP2Z CTOD ...  

Science Conference Proceedings (OSTI)

Abstract Scope, API RP2Z testing is used by the oil and gas industry to qualify steel ... Additionally, the current RP2Z welding procedure may not lead to uniform  ...

390

Full-scale Up-Flo^® stormwater filter field performance verification tests.  

E-Print Network (OSTI)

??The Up-Flo® Filter is an innovative high-rate, small footprint, stormwater treatment device based on upward filtration technology. It was originally developed by environmental engineers at… (more)

Cai, Yezhao

2013-01-01T23:59:59.000Z

391

Hybrid Transmission Corridor Study: Volume 2: Phase 2--Full-Scale Tests  

Science Conference Proceedings (OSTI)

Adding an HVDC transmission line to an existing right-of-way with an HVAC line can increase power transfer for a given right-of-way width. However, interaction between the two line types can change some electrical effects unless a critical distance is exceeded.

1992-07-14T23:59:59.000Z

392

Full scale field demonstration of unheated anaerobic contact stabilization. Project status report, October 1980-February 1981  

DOE Green Energy (OSTI)

The objective of the study reported here is to demonstrate that municipal sewage sludges can be anaerobically digested with little or no heating. To this end, two digesters at the Jackson Pike Wastewater Treatment Plant in Columbus, Ohio, have been converted to the anaerobic contact stabilization process. This, it is hoped, will permit positive and independent control of the solids retention time (SRT) in the system, so that solids may be retained long enough to ensure substantially complete digestion even at reduced temperatures. Digestion at a temperature of 71/sup 0/F and an SRT of 33 days produces results similar to digestion at a temperature of 91/sup 0/F and an SRT of 11 days. There is no evidence of impaired or unstable digestion at the lower temperature. (DMC)

Sykes, R.M.

1981-04-01T23:59:59.000Z

393

Effect of seasonal changes in quantities of biowaste on full scale anaerobic digester performance  

Science Conference Proceedings (OSTI)

A 750,000 l digester located in Roppen/Austria was studied over a 2-year period. The concentrations and amounts of CH{sub 4}, H{sub 2}, CO{sub 2} and H{sub 2}S and several other process parameters like temperature, retention time, dry weight and input of substrate were registered continuously. On a weekly scale the pH and the concentrations of NH{sub 4}{sup +}-N and volatile fatty acids (acetic, butyric, iso-butyric, propionic, valeric and iso-valeric acid) were measured. The data show a similar pattern of seasonal gas production over 2 years of monitoring. The consumption of VFA and not the hydrogenotrophic CH{sub 4} production appeared to be the limiting factor for the investigated digestion process. Whereas the changes in pH and the concentrations of most VFA did not correspond with changes in biogas production, the ratio of acetic to propionic acid and the concentration of H{sub 2} appeared to be useful indicators for reactor performance. However, the most influential factors for the anaerobic digestion process were the amount and the quality of input material, which distinctly changed throughout the year.

Illmer, P. [University of Innsbruck, Institute of Microbiology, Technikerstr. 25, A-6020 Innsbruck (Austria)], E-mail: Paul.Illmer@uibk.ac.at; Gstraunthaler, G. [Abfallbeseitigungsverband Westtirol, Breite Mure, A-6426 Roppen (Austria)

2009-01-15T23:59:59.000Z

394

Towards The Removal Of Uncertainty In Sustainable Building Design Through Full Scale Optimization.  

E-Print Network (OSTI)

??The lack of whole-building design optimization resources available to building designers has led to uncertainty in design decisions involved with building highly sustainable or 'Green'… (more)

Fix, Stuart C.

2010-01-01T23:59:59.000Z

395

Numerical simulation and prediction of loads in marine current turbine full-scale rotor blades.  

E-Print Network (OSTI)

??Marine current turbines are submerged structures and subjected to loading conditions from both the currents and wave effects. The associated phenomena posed significant challenge to… (more)

Senat, Junior.

2011-01-01T23:59:59.000Z

396

Evaluation of the Results of Several Full-Scale Conductor Wind Loading Experiments  

Science Conference Proceedings (OSTI)

In 1991, EPRI's Transmission Line Mechanical Research Center (TLMRC) conducted an experiment that instrumented a transmission tower and two spans of conductors. The instrumentation collected the wind data in a form that could be processed using some of the data reduction methods adopted in previous wind loading experiments conducted by Ontario Hydro, Bonneville Power Administration, and Hydro Quebec.

1995-01-10T23:59:59.000Z

397

Ancillary Frequency Control of Direct Drive Full-Scale Converter Based Wind Power Plants  

E-Print Network (OSTI)

of doubly fed induction machine (DFIG) and PMSG based wind turbines have been proposed [7-10]. In this paper

Hu, Weihao

398

Modeling basin- and plume-scale processes of CO2 storage for full-scale deployment  

E-Print Network (OSTI)

2005. A regional aquifer model for southeastern Wisconsin.Report 41, the Southeastern Wisconsin Regional PlanningCommission, Madison, Wisconsin, USA. Foley, F.C. , W.C.

Zhou, Q.

2010-01-01T23:59:59.000Z

399

Full-Scale Demonstration of Low-NOx Cell Burner Retrofit: A...  

NLE Websites -- All DOE Office Websites (Extended Search)

in the United States. A 1994 estimate using a nominal 600-MWe unit gave an estimated capital cost for an LNCB retrofit of 9kW. Assuming uncontrolled NO x emissions of 1.20...

400

Full Scale Cyclic Testing of Foundation Support Systems for Highway Bridges. Part II: Abutment Backwalls  

E-Print Network (OSTI)

to the push direction. Plywood wing walls hor. LVDT Vert.hor. LVDT Actuator 5 – hor. Plywood wing walls Figure 3.3.backfill. Side panels of plywood were erected to simulate

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Wildfire ignition resistant home design(WIRHD) program: Full-scale testing and demonstration final report.  

SciTech Connect

The primary goal of the Wildfire ignition resistant home design(WIRHD) program was to develop a home evaluation tool that could assess the ignition potential of a structure subjected to wildfire exposures. This report describes the tests that were conducted, summarizes the results, and discusses the implications of these results with regard to the vulnerabilities to homes and buildings.

Quarles, Stephen, L.; Sindelar, Melissa

2011-12-13T23:59:59.000Z

402

Full-Scale Fire Tests With Automatic Sprinklers in A Patient ...  

Science Conference Proceedings (OSTI)

... for Fire Research National Engineering Laboratory National Bureau ... of Health and Human Services (HHS) are ... of health care facilities and in the test ...

2009-02-18T23:59:59.000Z

403

FULL-SCALE AND TIME-SCALE HEATING EXPERIMENTS AT STRIPA: PRELIMINARY RESULTS  

E-Print Network (OSTI)

of the fuel From ii nuclear reactor [3]. This is consideredof the fuel from a nuclear reactor, [3]. These two full-

Cook, Neville G.W.; Hood, Michael.

2008-01-01T23:59:59.000Z

404

Numerical calculations of wind flow in a full-scale wind test facility  

DOE Green Energy (OSTI)

Numerical studies on wind flow around the Texas Tech University (TTU) Wind Engineering Research Field Laboratory (WERFL) building were conducted. The main focus of this paper is wind loads on the TTU building in the INEEL proposed Windstorm Simulation Center. The results are presented in the form of distributions of static pressure, dynamic pressure, pressure coefficients, and velocity vectors on the surface and the vicinity of the TTU building.

C.H. Oh; J.M. Lacey

1999-06-20T23:59:59.000Z

405

Investigation of the fire performance of building insulation in full-scale and laboratory fire tests  

SciTech Connect

Twenty-two insulations are exposed to fire tests including the 25 ft Tunnel test, the Attic Floor Radiant Panel test and actual fire conditions of a simulated attic configuration. The insulations consisted of a number of cellulose fiber insulations, utilizing various chemical treatments, glass fiber and mineral fiber insulations. The fire performance characteristics of the insulations were measured in each of the three test scenarios and the report compares their results.

Kleinfelder, W.A.

1984-04-01T23:59:59.000Z

406

Summative evaluation with a full-scale patient simulator: Challenges and adaptations  

E-Print Network (OSTI)

MicrovisionTM Nomad) · Audio--Visual plus respiratory sonification (continuous two-tone auditory display of RR

Queensland, University of

407

FULL-SCALE AND TIME-SCALE HEATING EXPERIMENTS AT STRIPA: PRELIMINARY RESULTS  

E-Print Network (OSTI)

through the Swedish Nuclear Fuel Supply Company (SKBF) , andwith the Swedish Nuclear Fuel Supply Company. VII. [I]after removdl of the fuel From ii nuclear reactor [3]. This

Cook, Neville G.W.; Hood, Michael.

2008-01-01T23:59:59.000Z

408

Modeling basin- and plume-scale processes of CO2 storage for full-scale deployment  

E-Print Network (OSTI)

investigations on natural gas storage fields in the basin (using data from natural gas storage fields and large-scalefrom the nearest natural gas storage fields in operation,

Zhou, Q.

2010-01-01T23:59:59.000Z

409

Full Scale Cyclic Testing of Foundation Support Systems for Highway Bridges. Part II: Abutment Backwalls  

E-Print Network (OSTI)

J. Geotech. Engrg. ASCE, 120(8), 1307-1323. Gadre, A. andJ. Geotech. & Geoenv. Engrg. ASCE, 124(11), 1128-1138. Goel,Geotech. & Geoenv. Engrg. ASCE, 127(2), 0185-0192. Narain,

2007-01-01T23:59:59.000Z

410

Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft  

SciTech Connect

The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

Not Available

1994-09-01T23:59:59.000Z

411

Radiological Survey Results for Areas A1 North, A5A, A6, and B2 at the Molycorp Washington Remediation Project, Washington, Pennsylvania  

SciTech Connect

Perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania

W.C. Adams

2007-03-13T23:59:59.000Z

412

DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Savannah River Remediation, LLC for Liquid Waste DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site December 8, 2008 - 4:58pm Addthis Washington, D.C. -The U.S. Department of Energy (DOE) today announced the award to Savannah River Remediation, LLC as the liquid waste contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $3.3 billion over the entire contract, consisting of a base period of six years, plus an option to extend for up to two additional years. The base performance period of the contract will be from April 1, 2009 through March 31, 2015. A 90-day transition period will begin January 2, 2009.

413

Recovery Act Begins Box Remediation Operations at F Canyon | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon May 17, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Paivi Nettamo, SRNS (803) 646-6075 paivi.nettamo@srs.gov AIKEN, S.C. - The F Canyon box remediation program, an American Recovery and Reinvestment Act project at Savannah River Site (SRS), has come online to process legacy transuranic (TRU) waste for off-site shipment and permanent disposal at the Waste Isolation Pilot Plant (WIPP), a geological repository in New Mexico. The $40-million facility will process approximately 330 boxes containing TRU waste with a radiological risk higher than seen in the rest of the Site's original 5,000-cubic-meter

414

Audit of Groundwater Remediation Plans at Savannah River, ER-B-96-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF GROUNDWATER REMEDIATION PLANS AT THE SAVANNAH RIVER SITE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible.

415

DOE Amends Decision for the Remediation of the Moab Uranium Mill Tailings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amends Decision for the Remediation of the Moab Uranium Mill Amends Decision for the Remediation of the Moab Uranium Mill Tailings in Moab, Utah DOE Amends Decision for the Remediation of the Moab Uranium Mill Tailings in Moab, Utah February 29, 2008 - 11:43am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced an amendment to its 2005 Record of Decision (ROD) for the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project to allow for the use of truck or rail in transporting residual radioactive materials from the Moab site in Utah. These materials will be relocated to a new disposal site 30 miles north at Crescent Junction, Utah. "The Department is committed to ensuring the protection of human health and the environment in the Moab area and in the communities served by the Colorado River," Assistant Secretary for Environmental Management Jim

416

Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Workers Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint RICHLAND, Wash. - The Hanford Site is looking greener these days after American Recovery and Reinvestment Act workers revegetated 166 acres across 12 waste sites, planting over 1,100 pounds of seeds and about 280,000 pounds of mulch. The largest of the sites, known as the BC Control Area, is an approximately 13-square-mile area associated with a waste disposal system used during Hanford operations. Recovery Act workers remediated and reseeded a densely contaminated 140- acre portion of that area after disposing of more than 370,000 tons of contaminated soil. Recovery Act workers employed by DOE contractor CH2M HILL Plateau Remediation Company have remediated 61 waste sites,

417

Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediate and Restore Former Waste Sites, Help Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint The Hanford Site is looking greener these days after American Recovery and Reinvestment Act workers revegetated 166 acres across 12 waste sites, planting over 1,100 pounds of seeds and about 280,000 pounds of mulch. The largest of the sites, known as the BC Control Area, is an approximately 13-square-mile area associated with a waste disposal system used during Hanford operations. Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint More Documents & Publications 2011 ARRA Newsletters Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of

418

Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1  

Office of Legacy Management (LM)

Monticello Mill Tailings Site Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1 Focused Feasibility Study January 2004 Prepared by U.S. Department of Energy Grand Junction, Colorado Work performed under DOE Contract No. DE-AC1342GJ79491 DOE Task Order No. ST03-205 Document N u m b e r Q0029500 S i g t ~ a t u r e Page Signature Page Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendud Focused Feasibility Study January 2004 Submitted By: Arthur W. Kleinrath, Project Manager U.S. Department of Energy, Grand Junction, Colorado U.S. Department of Energyat Gmnd Junction MMTS OU 111 Remedial Investigation AddendutdFocuscd Feasibilily Study January 2004 Final iii This page intentionally left blank Document Number Q0029500 Contents U.S. Department of Energy at Grand Junction MMTS OU III Remedial Investigation Addendum/Focused Feasibility Study

419

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes  

Science Conference Proceedings (OSTI)

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

420

U.S. Department of Energy Awards Portsmouth Remediation Contract To  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Remediation Contract To Portsmouth Remediation Contract To LATA/Parallax U.S. Department of Energy Awards Portsmouth Remediation Contract To LATA/Parallax January 10, 2005 - 9:45am Addthis $141 Million Small Business Contract Runs Through September, 2009 WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that LATA-Parallax Portsmouth LLC, a small business joint venture between Los Alamos Technical Associates Inc. and Parallax Inc., was awarded a $141,261,897 small business contract to perform environmental remediation and waste management activities at the department's Portsmouth Gaseous Diffusion Plant in Piketon, Ohio. The contract will run through September 30, 2009, and provides incentives to the contractor for managing costs effectively while completing the cleanup work.

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The Management of the Plateau Remediation Contract, OAS-L-13-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the Plateau Management of the Plateau Remediation Contract OAS-L-13-03 December 2012 Department of Energy Washington, DC 20585 December 21, 2012 MEMORANDUM FOR THE DEPUTY ASSISTANT SECRETARY FOR ACQUISITION AND PROJECT MANAGEMENT FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Management of the Plateau Remediation Contract" BACKGROUND The Department of Energy's Richland Operations Office (Richland) awarded a contract, effective October 1, 2008, to CH2M HILL Plateau Remediation Company (CHPRC) to remediate select portions of the Hanford Site's Central Plateau. The contract, which could be extended for a maximum of 10 years, currently has a contract cost of $5.6 billion for authorized work. The

422

DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Savannah River Remediation, LLC for Liquid Waste DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site December 8, 2008 - 4:58pm Addthis Washington, D.C. -The U.S. Department of Energy (DOE) today announced the award to Savannah River Remediation, LLC as the liquid waste contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $3.3 billion over the entire contract, consisting of a base period of six years, plus an option to extend for up to two additional years. The base performance period of the contract will be from April 1, 2009 through March 31, 2015. A 90-day transition period will begin January 2, 2009.

423

U.S. Department of Energy Awards Paducah Remediation Contract | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Contract U.S. Department of Energy Awards Paducah Remediation Contract December 27, 2005 - 4:56pm Addthis Paducah Remediation Services, LLC wins $191 Million Small Business Contract Competition WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Paducah Remediation Services, LLC (PRS) has been awarded a $191.6 million small business contract to perform environmental remediation and waste management activities at the Department's Paducah Gaseous Diffusion Plant in Paducah, Ky. The contract, awarded as a result of a competition, will run through September 30, 2009 and provides incentives to the contractor for managing costs effectively while completing the cleanup work on schedule. "We are pleased to be moving forward with work that will reduce risk,

424

Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site CH2M Hill Plateau Site CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes This report documents the independent review of implementation verification review (IVR) processes at the Hanford Site CH2M Hill Plateau Remediation Company that were conducted by the Office of Enforcement and Oversight (Independent Oversight), which is within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS). The onsite review was performed by the HSS Office of Safety and Emergency Management Evaluations from August 13 to17, 2012. The objective of this assessment was to evaluate

425

Remediation by inspiration : artist-driven models for environmental clean-up  

E-Print Network (OSTI)

While often seen as utilitarian and technical, environmental remediation efforts have significant cultural, social and physical impacts. Accordingly, they demand responses that utilize a multi-disciplinary approach to the ...

Fain, Jessica (Jessica Elizabeth)

2011-01-01T23:59:59.000Z

426

Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI)  

Energy.gov (U.S. Department of Energy (DOE))

Located at the Savannah River Site in Aiken, South Carolina, the Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) was established to develop the tools,...

427

A Special Application Coiled Tubing Applied Plug for Geothermal Well Casing Remediation  

DOE Green Energy (OSTI)

Casing deformation in wells is a common problem in many geothermal fields. Casing remediation is necessary to keep wells in production and occasionally, to even enter the well for an approved plug and abandonment procedure. The costly alternative to casing remediation is to incur the expense of drilling a new well to maintain production or drilling a well to intersect a badly damaged well below the deformation for abandonment purposes. The U.S. Department of Energy and the Geothermal Drilling Organization sponsor research and development work at Sandia National Laboratories in an effort to reduce these remediation expenditures. Sandia, in cooperation with Halliburton Energy Services, has developed a low cost, commercially available, bridge-plug-type packer for use in geothermal well environments. This report documents the development and testing of this tool for use in casing remediation work.

Knudsen, S.D.; Sattler, A.R.; Staller, G.E.

1999-05-13T23:59:59.000Z

428

Study on the In-Situ Remediation of Cr-Contaminated Soil by ...  

Science Conference Proceedings (OSTI)

Stabilization of Chromium-based Slags with MgO · Study on the EMD Residue and Shale for Preparing Solidification Brick · Study on the In-Situ Remediation of  ...

429

EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming.

430

Bacterial influence on uranium oxidation reduction reactions : implications for environmental remediation and isotopic composition  

E-Print Network (OSTI)

The bacterial influence on the chemistry and speciation of uranium has some important impacts on the environment, and can be exploited usefully for the purposes of environmental remediation of uranium waste contamination. ...

Mullen, Lisa Maureen

2007-01-01T23:59:59.000Z

431

Tank waste remediation system retrieval and disposal mission waste feed delivery plan  

Science Conference Proceedings (OSTI)

This document is a plan presenting the objectives, organization, and management and technical approaches for the Waste Feed Delivery (WFD) Program. This WFD Plan focuses on the Tank Waste Remediation System (TWRS) Project`s Waste Retrieval and Disposal Mission.

Potter, R.D.

1998-01-08T23:59:59.000Z

432

Preliminary Lessons Learned From The Gunite And Associated Tanks (gaat) Remediation Project At Oakridge National Laboratory  

E-Print Network (OSTI)

The Gunite and Associated Tanks (GAAT) Remediation Project is being conducted at Oak Ridge National Laboratory (ORNL) and has been noted as one of the most highly successful tank remediation projects conducted within the U.S. Department of Energy. The GAAT Remediation Project has successfully integrated robotic, remotely operated, and other equipment, and several contractors to achieve measurable results. With the project under cost and ahead of schedule and tank waste removal activities on track for a September 2000 completion, the GAAT team has begun the effort to capture the lessons learned from this extremely successful project. This paper is a preliminary compilation of the lessons learned during the project, with a complete compilation scheduled for the end of the project. PROJECT HISTORY The Gunite and Associated Tanks (GAAT) Remediation Project at Oak Ridge National Laboratory (ORNL) was initiated in 1992 under the Federal Facility Agreement (FFA) between the U.S. Depar...

Karen Billingsley; S. D. Van Hoesen; Tom Hylton; Peter D. Lloyd; Joel A. Miller; The Gunite; Associated Tanks (gaat Remediation; Robbin Russell John; John A. Emison; Abby Parker; Glen Tubb; Barry L. Burks; R. Eric Depew; Diedre D. Falter; David P. Vesco

2000-01-01T23:59:59.000Z

433

DOE/OR/20722-34 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

4 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 10 GROVE AVENUE Rochelle Park,...

434

DOE/OR/20722-41 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

1 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 38 GROVE AVENUE Rochelle Park,...

435

DOE/OR/20722-40 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

40 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 34 GROVE AVENUE Rochelle Park,...

436

DOE/OR/20722-42 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

2 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 42 GROVE AVENUE Rochelle Park,...

437

DOE/OR/20722-37 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

7 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 22 GROVE AVENUE Rochelle Park,...

438

DOE/OR/20722-39 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

39 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 30 GROVE AVENUE Rochelle Park,...

439

DOE/OR/20722-38 Formerly Utilized Sites Remedial Action Program...  

Office of Legacy Management (LM)

8 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 26 GROVE AVENUE Rochelle Park,...

440

EM's $500,000 Investment in Contaminant Remediation Leads to Hanford Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$500,000 Investment in Contaminant Remediation Leads to $500,000 Investment in Contaminant Remediation Leads to Hanford Site Strategy Providing $6.35 Million in Cost Savings EM's $500,000 Investment in Contaminant Remediation Leads to Hanford Site Strategy Providing $6.35 Million in Cost Savings November 29, 2012 - 12:00pm Addthis Data collection takes place during a field demonstration at the Hanford site as a case study of the analysis approach. Data collection takes place during a field demonstration at the Hanford site as a case study of the analysis approach. Through a collaborative approach between the EM Headquarters' Office of Groundwater and Soil Remediation, the Richland Operations Office and the Pacific Northwest National Laboratory (PNNL), investments are being leveraged and integrated in applied research and site operations to provide

Note: This page contains sample records for the topic "dnapl remediation full-scale" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

In-situ remediation system for groundwater and soils  

DOE Patents (OSTI)

A method and system are presented for in-situ remediation of contaminated groundwater and soil where the contaminants, such as toxic metals, are carried in a subsurface plume. The method comprises selection and injection into the soil of a fluid that will cause the contaminants to form stable, non-toxic compounds either directly by combining with the contaminants or indirectly by creating conditions in the soil or changing the conditions of the soil so that the formation of stable, non-toxic compounds between the contaminants and existing substances in the soil are more favorable. In the case of non-toxic metal contaminants, sulfides or sulfates are injected so that metal sulfides or sulfates are formed. Alternatively, an inert gas may be injected to stimulate microorganisms in the soil to produce sulfides which, in turn, react with the metal contaminants. Preferably, two wells are used, one to inject the fluid and one to extract the unused portion of the fluid. The two wells work in combination to create a flow of the fluid across the plume to achieve better, more rapid mixing of the fluid and the contaminants. 4 figures.

Corey, J.C.; Kaback, D.S.; Looney, B.B.

1993-11-23T23:59:59.000Z

442

Scientific Opportunities for Monitoring of Environmental Remediation Sites (SOMERS)  

SciTech Connect

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. DOE maintains the largest cleanup program in the world, currently spanning over a million acres in 13 states. The inventory of contaminated materials includes 90 million gallons of radioactive waste, 6.4 trillion liters of groundwater, and 40 million cubic meters of soil and debris. It is not feasible to completely restore many sites to predisposal conditions. Any contamination left in place will require monitoring, engineering controls and/or land use restrictions to protect human health and environment. Research and development efforts to date have focused on improving characterization and remediation. Yet, monitoring will result in the largest life-cycle costs and will be critical to improving performance and protection. Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

Bunn, Amoret L [Pacific Northwest National Laboratory (PNNL); Wellman, Dawn M. [Pacific Northwest National Laboratory (PNNL); Deeb, Rula A [ARCADIS/Malcolm Pirnie; Hawley, Elisabeth L [ARCADIS/Malcolm Pirnie; Truex, Michael J [Pacific Northwest National Laboratory (PNNL); Peterson, Mark J [ORNL; Freshley, Mark D [Pacific Northwest National Laboratory (PNNL); Pierce, Eric M [ORNL; Mccord, John [S.M. Stoller Corporation; Young, Michael H [University of Texas, Austin; Gilmore, Tyler J [Pacific Northwest National Laboratory (PNNL); Miller, Rick [University of Kansas; Miracle, Ann L [Pacific Northwest National Laboratory (PNNL); Kaback, Dawn [AMEC Geomatrix; Eddy-Dilek, Carol [Savannah River National Laboratory (SRNL); Rossabi, Joe [Redox Tech, LLC; Lee, M Hope [Idaho National Laboratory (INL); Bush, Richard [U.S. Department of Energy, Grand Junction, Colorado (USA); Beam, Paul [U. S. Department of Energy, Office of Groundwater and Soil Remediation; Chamberlain, Grover [U. S. Department of Energy, Office of Groundwater and Soil Remediation; Gerdes, Kurt [U. S. Department of Energy, Office of Groundwater and Soil Remediation; Collazo, Yvette [U.S. Department of Energy

2012-01-01T23:59:59.000Z

443

Scientific Opportunities for Monitoring of Environmental Remediation Sites - (SOMERS)  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) is responsible for risk reduction and cleanup of its nuclear weapons complex. DOE maintains the largest cleanup program in the world, currently spanning over a million acres in 13 states. The inventory of contaminated materials includes 90 million gallons of radioactive waste, 6.4 trillion liters of groundwater, and 40 million cubic meters of soil and debris. It is not feasible to completely restore many sites to predisposal conditions. Any contamination left in place will require monitoring, engineering controls and/or land use restrictions to protect human health and environment. Research and development efforts to date have focused on improving characterization and remediation. Yet, monitoring will result in the largest life-cycle costs and will be critical to improving performance and protection. Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

Bunn, Amoret L.; Wellman, Dawn M.; Deeb, Rula A.; Hawley, Elizabeth L.; Truex, Michael J.; Peterson, Mark; Freshley, Mark D.; Pierce, Eric M.; McCord, John; Young, Michael H.; Gilmore, Tyler J.; Miller, Rick; Miracle, Ann L.; Kaback, Dawn; Eddy-Dilek, Carol; Rossabi, Joe; Lee, Hope; Bush, Richard P.; Beam , Paul; Chamberlain, G. M.; Gerdes, Kurt D.; Collazo, Yvette

2012-03-01T23:59:59.000Z

444

Remediation activities at the Fernald Environmental Management Project (FEMP)  

Science Conference Proceedings (OSTI)

The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began manufacturing uranium products in the early 1950`s and continued processing uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to produce uranium metals for use at other DOE sites across the country. Since the facility manufactured uranium metals for over thirty years, various amounts of radiological contamination exists at the site. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were also generated at the site. In 1989. the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility`s radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper discusses the proposed remediation activities at the five Operable Units (OUs) designated at the FEMP. In addition, the paper also examines the ongoing CERCLA response actions and RCRA closure activities at the facility.

Walsh, T.J. [FERMCO, Cincinnati, OH (United States); Danner, R. [Dept. of Energy, Cincinnati, OH (United States)

<