Powered by Deep Web Technologies
Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Automation i Distributionsnät; Distribution automation.  

E-Print Network [OSTI]

?? As a part of Göteborg Energi’s work towards a smarter electric grid, the company has chosen to investigate the possibilities of automation in their… (more)

Mård, Mathias

2012-01-01T23:59:59.000Z

2

Transactive Control and Coordination of Distributed Assets for Ancillary Services  

SciTech Connect (OSTI)

The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)—a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: • Participation should be entirely voluntary. • The participant decides at what price s/he is willing to participate. • The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: • spinning reserve • ramping • regulation. These services are to be provided by the following devices: • refrigerators • water heaters • clothes dryers • variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal) introduce delays that can be issues in some signal processing applications that treat the high frequency part as a noise to be eliminated. For regulation, the high frequency component is an essential part of the signal. The delay in the low frequency component is not a problem. A stochastic self-dispatch algorithm determines the response of the devices to the regulation signal. • In an ensemble of devices under normal operation, some devices turn on and some turn off in any time interval. Demand response necessitates turning off devices that would normally be on, or turning on devices that would normally be off. Over time, some of these would have turned off on their own. A formalism to determine expectation values under a combination of natural and forced attrition has been developed. This formalism provides a mechanism for accomplishing a desired power profile within a bid period. In particular, a method to minimize regulation requirement can be developed. The formulation provides valuable insights into control. • Some ancillary services—ramping to absorb unforecasted increase in renewable generation, and regulation down—require the demand resources to increase their energy use. Some resources such as HVAC systems can do this readily, whereas some others require enabling technology. Even without such technology, it is possible to arrange refrigerators and water heaters to have an energy debt and be ready to increase their energy use. A transactive bid mechanism of revolving debt can be developed for this purpose. Dramatic changes in control systems, architecture and markets are expected in the electrical grid. The technical capabilities of a large number of devices interacting with the grid are changing. While it is too early to describe complete solutions, TC2 has attractive features suitable for adapting to the changes. The analyses in this report and the activities planned for FY 14 and beyond are designed to facilitate this transition.

Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

2013-09-18T23:59:59.000Z

3

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS  

E-Print Network [OSTI]

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

Kozak, Victor R.

4

Distributed Automated Demand Response - Energy Innovation Portal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Find More Like This Return to Search Distributed Automated Demand Response Lawrence Livermore National Laboratory Contact LLNL About This Technology...

5

Definition: Distribution Automation Communications Network | Open Energy  

Open Energy Info (EERE)

Automation Communications Network Automation Communications Network Jump to: navigation, search Dictionary.png Distribution Automation Communications Network A communications network or networks designed to deliver control signals and information between distribution automation devices, and between these devices and utility grid control systems. These networks can utilize wired or wireless connections, and can be utility-owned or provided as services by a third party.[1] Related Terms distribution automation References ↑ https://www.smartgrid.gov/category/technology/distribution_automation_communications_network [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from

6

2012 SG Peer Review - Wide Area Wireless Distribution Grid Sensor & Faulted Circuit Indicator System for Underground Assets - Jason Wilson, On-Ramp Wireless  

Broader source: Energy.gov (indexed) [DOE]

Wide Area Wireless Distribution Grid Sensor Wide Area Wireless Distribution Grid Sensor for Underground Assets Jason Wilson On-Ramp Wireless June 7, 2012 December 2008 Wide Area Wireless Distribution Grid Sensor for Underground Assets Objective Life-cycle Funding Summary ($K) Prior to FY 12 FY12, authorized FY13, requested Out-year(s) $1,046 $580 $39 $0 Technical Scope Develop and demonstrate a wireless network solution for distribution automation, including fault circuit indicators and transformer monitoring, capable of secure and reliable communication with below ground and hard to reach utility assets at a TCO that is commercially viable for utilities to deploy at large scale. Enable utilities throughout the US to improve critical grid reliability metrics including SAIDI. * Conceptual design and trade studies including sensor system interfaces, augmenting FCI with

7

Definition: Automated Distribution Circuit Switches | Open Energy  

Open Energy Info (EERE)

Circuit Switches Circuit Switches Jump to: navigation, search Dictionary.png Automated Distribution Circuit Switches Distribution circuit switches that can be operated automatically in response to control signals from local sensors, distribution automation systems, or grid control systems. Such switches can be installed as automated devices or existing equipment can be retrofitted with controls and communications. The degree of automation depends on the controls and communications system implemented. These switches can be opened or closed to isolate portions of a distribution circuit that has experienced a short circuit (fault), or must be taken out of service for maintenance or other operations. When used in combination, these switches can reroute power from other substations or nearby distribution circuits.[1]

8

Distributed Smart Grid Asset Control Strategies for Providing Ancillary Services  

SciTech Connect (OSTI)

With large-scale plans to integrate renewable generation driven mainly by state-level renewable portfolio requirements, more resources will be needed to compensate for the uncertainty and variability associated with intermittent generation resources. Distributed assets can be used to mitigate the concerns associated with renewable energy resources and to keep costs down. Under such conditions, performing primary frequency control using only supply-side resources becomes not only prohibitively expensive but also technically difficult. It is therefore important to explore how a sufficient proportion of the loads could assume a routine role in primary frequency control to maintain the stability of the system at an acceptable cost. The main objective of this project is to develop a novel hierarchical distributed framework for frequency based load control. The framework involves two decision layers. The top decision layer determines the optimal gain for aggregated loads for each load bus. The gains are computed using decentralized robust control methods, and will be broadcast to the corresponding participating loads every control period. The second layer consists of a large number of heterogeneous devices, which switch probabilistically during contingencies so that aggregated power change matches the desired amount according to the most recently received gains. The simulation results show great potential to enable systematic design of demand-side primary frequency control with stability guarantees on the overall power system. The proposed design systematically accounts for the interactions between the total load response and bulk power system frequency dynamics. It also guarantees frequency stability under a wide range of time varying operating conditions. The local device-level load response rules fully respect the device constraints (such as temperature setpoint, compressor time delays of HVACs, or arrival and departure of the deferrable loads), which are crucial for implementing real load control programs. The promise of autonomous, Grid Friendly™ response by smart appliances in the form of under-frequency load shedding was demonstrated in the GridWise Olympic Peninsula Demonstration in 2006. Each controller monitored the power grid voltage signal and requested that electrical load be shed by its appliance whenever electric power-grid frequency fell below 59.95 Hz. The controllers and their appliances responded reliably to each shallow under-frequency event, which was an average of one event per day and shed their loads for the durations of these events. Another objective of this project was to perform extensive simulation studies to investigate the impact of a population of Grid Friendly™ Appliances (GFAs) on the bulk power system frequency stability. The GFAs considered in this report are represented as demonstration units with water heaters individually modeled.

Kalsi, Karanjit; Zhang, Wei; Lian, Jianming; Marinovici, Laurentiu D.; Moya, Christian; Dagle, Jeffery E.

2013-10-30T23:59:59.000Z

9

Distributed Intelligent Automated Demand Response (DIADR) Building  

Broader source: Energy.gov (indexed) [DOE]

Distributed Intelligent Automated Demand Distributed Intelligent Automated Demand Response (DIADR) Building Management System Distributed Intelligent Automated Demand Response (DIADR) Building Management System The U.S. Department of Energy (DOE) is currently conducting research into distributed intelligent-automated demand response (DIADR) building management systems. Project Description This project aims to develop a DIADR building management system with intelligent optimization and control algorithms for demand management, taking into account a multitude of factors affecting cost including: Comfort Heating, ventilating, and air conditioning (HVAC) Lighting Other building systems Climate Usage and occupancy patterns. The key challenge is to provide the demand response the ability to address more and more complex building systems that include a variety of loads,

10

Definition: Distribution Automation | Open Energy Information  

Open Energy Info (EERE)

Automation Automation Jump to: navigation, search Dictionary.png Distribution Automation DA is a family of technologies including sensors, processors, communication networks, and switches that can perform a number of distribution system functions depending on how they are implemented. Over the last 20 years, utilities have been applying DA to improve reliability, service quality and operational efficiency. More recently, DA is being applied to perform automatic switching, reactive power compensation coordination, or other feeder operations/control.[1] Related Terms sustainability, smart grid References ↑ https://www.smartgrid.gov/category/technology/distribution_automation [[Ca LikeLike UnlikeLike You and one other like this.One person likes this. Sign Up to see what your friends like.

11

DAVIC - Distributed Energy Automation via Implicit Communication  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DAVIC - Distributed Energy Automation via Implicit Communication DAVIC - Distributed Energy Automation via Implicit Communication Speaker(s): Peter Palensky Date: January 22, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu The electricity grid is seen as a wide-area distributed process, determined by its sub-processes - in our case the loads and distributed generation. Network-based coordination needs to be done very carefully and properly timed to avoid instabilities. Luckily, every point of the grid has the same grid frequency and the same time. Integrating these two trivial things (implicit communication) into one consistent communication model might complement a low-quality (explicit) best-effort communication channel (e.g. Internet, GPRS) for real time applications. A simulation shall clarify how

12

E-Print Network 3.0 - automated fault extraction Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with extracted... automation, fault diagnosis, asset management, as well as power system modeling and simulation. 12;... 1 F Voltage Sag Data Utilization for Distribution Fault...

13

Video-Based Multi-Camera Automated Surveillance of High Value Assets in Nuclear Facilities C.-H. Chen, Y. Yao, D. Page, B. Abidi, A. Koschan, and M. Abidi  

E-Print Network [OSTI]

(2005). ACKNOWLEDGEMENTS This research was supported by the DOE University Research Program in RoboticsVideo-Based Multi-Camera Automated Surveillance of High Value Assets in Nuclear Facilities C,besma,akoschan,abidi}@utk.edu INTRODUCTION In a nuclear facility, asset monitoring and chain-of- custody protocols are essential to maintain

Abidi, Mongi A.

14

A Distributed Facilities Automation System For IBM Buildings  

E-Print Network [OSTI]

protocol. This will allow the facility manager to take advantage of the expertise of ~any control system suppliers while retaining central control, override authority, and specialized manage ment functions. A distributed facilities automation system... protocol. This will allow the facility manager to take advantage of the expertise of ~any control system suppliers while retaining central control, override authority, and specialized manage ment functions. A distributed facilities automation system...

Houle, W. D. Sr.

15

Integrated, Automated Distributed Generation Technologies Demonstration  

SciTech Connect (OSTI)

The purpose of the NETL Project was to develop a diverse combination of distributed renewable generation technologies and controls and demonstrate how the renewable generation could help manage substation peak demand at the ATK Promontory plant site. The Promontory plant site is located in the northwestern Utah desert approximately 25 miles west of Brigham City, Utah. The plant encompasses 20,000 acres and has over 500 buildings. The ATK Promontory plant primarily manufactures solid propellant rocket motors for both commercial and government launch systems. The original project objectives focused on distributed generation; a 100 kW (kilowatt) wind turbine, a 100 kW new technology waste heat generation unit, a 500 kW energy storage system, and an intelligent system-wide automation system to monitor and control the renewable energy devices then release the stored energy during the peak demand time. The original goal was to reduce peak demand from the electrical utility company, Rocky Mountain Power (RMP), by 3.4%. For a period of time we also sought to integrate our energy storage requirements with a flywheel storage system (500 kW) proposed for the Promontory/RMP Substation. Ultimately the flywheel storage system could not meet our project timetable, so the storage requirement was switched to a battery storage system (300 kW.) A secondary objective was to design/install a bi-directional customer/utility gateway application for real-time visibility and communications between RMP, and ATK. This objective was not achieved because of technical issues with RMP, ATK Information Technology Department’s stringent requirements based on being a rocket motor manufacturing facility, and budget constraints. Of the original objectives, the following were achieved: • Installation of a 100 kW wind turbine. • Installation of a 300 kW battery storage system. • Integrated control system installed to offset electrical demand by releasing stored energy from renewable sources during peak hours of the day. Control system also monitors the wind turbine and battery storage system health, power output, and issues critical alarms. Of the original objectives, the following were not achieved: • 100 kW new technology waste heat generation unit. • Bi-directional customer/utility gateway for real time visibility and communications between RMP and ATK. • 3.4% reduction in peak demand. 1.7% reduction in peak demand was realized instead.

Jensen, Kevin

2014-09-30T23:59:59.000Z

16

DA (Distribution Automation) (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DA (Distribution Automation) (Smart Grid Project) DA (Distribution Automation) (Smart Grid Project) Jump to: navigation, search Project Name DA (Distribution Automation) Country Netherlands Coordinates 52.132633°, 5.291266° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.132633,"lon":5.291266,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

17

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

18

Distribution capacitor automation that controls voltage and saves energy  

SciTech Connect (OSTI)

The Electric Distribution Business Line of Southern California Edison Company (SCE) has begun a program to improve the distribution system operations and electrical efficiency. The program, called the Distribution System Efficiency Enhancement Program (DSEEP), consists of five principal projects: Automated Switching, Circuit Lock-Out Alarming, Substation Monitoring and Control, Outage Management, and Distribution Capacitor Automation Project (DCAP). DCAP is the largest and most sophisticated of the projects being implemented. The project takes advantage of fine-tuning customer voltages for conservation voltage regulation (CVR) benefits as well as minimizes line losses by reducing unnecessary reactive power flow. DCAP can also help to increase transmission line and substation capacity by improving system power factor. The DCAP system takes advantage of the distributed processing capability of meters, capacitor controllers, radios, and substation processors. DCAP uses two-way packet radios and new electronic meters that read real-time customer voltages as well as energy consumption. The radios transmit customer meter voltage information and capacitor status to substation processors, where a control algorithm runs to determine which capacitors should be turned on or off. The objective of DCAP is to reduce over-all net energy transfer from the substation to the customer and meet system VAR requirements. SCE has tested the system on 66 circuit capacitors (including 3 substation capacitors) on 18 circuits served from two substations. The positive results of the DCAP demonstrations has led to an aggressive roll-out plan for system-wide implementation of automating over 7600 switched capacitors by year-end 1995.

Williams, B.R.

1994-12-31T23:59:59.000Z

19

Scalable Distributed Automation System: Scalable Real-time Decentralized Volt/VAR Control  

SciTech Connect (OSTI)

GENI Project: Caltech is developing a distributed automation system that allows distributed generators—solar panels, wind farms, thermal co-generation systems—to effectively manage their own power. To date, the main stumbling block for distributed automation systems has been the inability to develop software that can handle more than 100,000 distributed generators and be implemented in real time. Caltech’s software could allow millions of generators to self-manage through local sensing, computation, and communication. Taken together, localized algorithms can support certain global objectives, such as maintaining the balance of energy supply and demand, regulating voltage and frequency, and minimizing cost. An automated, grid-wide power control system would ease the integration of renewable energy sources like solar power into the grid by quickly transmitting power when it is created, eliminating the energy loss associated with the lack of renewable energy storage capacity of the grid.

None

2012-03-01T23:59:59.000Z

20

Complete Automation of Future Grid for Optimal Real-Time Distribution of Renewables  

E-Print Network [OSTI]

Complete Automation of Future Grid for Optimal Real-Time Distribution of Renewables Kiyoshi integrates tie-set graph theory with an intelligent agent system, is presented to distribute renewable energy and renewable generation is highly variable and unpredictable. Simulation results on a one hundred-node network

Loudon, Catherine

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

A Fully Automated Fault-tolerant System for Distributed Video Processing and Off-site Replication  

E-Print Network [OSTI]

A Fully Automated Fault-tolerant System for Distributed Video Processing and Off-site Replication been a failure-prone tedious operation with an operator needed to babysit the processing and off-site, off-site replication, fault-tolerance, grid, educational research. 1. INTRODUCTION In different fields

Wisconsin at Madison, University of

22

Automated Analysis of Fault-Tolerance in Distributed Systems Scott D. Stoller y  

E-Print Network [OSTI]

Automated Analysis of Fault-Tolerance in Distributed Systems #3; Scott D. Stoller y Computer satisfy in speci#12;ed failure scenarios. Our analysis method is to compute, for each failure scenario for which the user speci#12;ed a fault-tolerance requirement, an MFG representing the system's communication

Schneider, Fred B.

23

Abstract--Implementation of Distribution Automation (DA) and Demand Side Management (DSM) intended to serve both  

E-Print Network [OSTI]

Abstract--Implementation of Distribution Automation (DA) and Demand Side Management (DSM) intended, requires a wide-area two-way communication system. DA and DSM devices (customer meters, switches, etc for both DA/DSM applications can be met. And a scheduling policy is proposed to provide the applications

Paris-Sud XI, Université de

24

Automated Distributed Implementation of Component-based Models with Priorities  

E-Print Network [OSTI]

School of Computer Science University of Waterloo 200 University Avenue West Waterloo, Canada, N2L3G1.4 [Computer-Communication Networks]: Distributed Systems[Distributed applications] ; D.1.3 [Programming the European Community's Seventh Framework Pro- gramme [FP7/2007-2013] under grant agreement no 248776 (PRO3D

Paris-Sud XI, Université de

25

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

Hydro Capital Asset Manager  

Broader source: Energy.gov [DOE]

This position is located in Federal Hydro Projects, Generation Asset Management, Power Services. Additional vacancies may be filled through this vacancy announcement or if they become available.

27

Commercial Building Energy Asset Scoring Tool Application Programming Interface  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Scoring Tool Commercial Building Energy Asset Scoring Tool Application Programming Interface NORA WANG GEOFF ELLIOTT JUSTIN ALMQUIST EDWARD ELLIS Pacific Northwest National Laboratory JUNE 14, 2013 Commercial Building Energy Asset Score Energy asset score evaluates the as- built physical characteristics of a building Energy Asset Score and its overall energy efficiency, independent of occupancy and operational choices. The physical characteristics include Building envelope (window, wall, roof) HVAC systems (heating, cooling, air distribution) Lighting system (luminaire and lighting control systems) Service hot water system Other major energy-using equipment (e.g. commercial refrigerator, commercial kitchen appliances, etc.) Building energy use is affected by many factors.

28

ASSET Minor Sustainable  

E-Print Network [OSTI]

ASSET Minor Sustainable Design Engineering Sustainable Science, Engineering and Technology (ASSET a sustainable world as a complex, multidisciplinary challenge. This minor will help you understand this thinking especially for this purpose. · You'll learn how to enact successful strategies for dealing with sustainable

29

Life Cycle Asset Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order addresses stewardship of physical assets as valuable national resources in a cost-effective manner to meet the DOE mission using industry standards, a graded approach, and performance objective.

1995-10-26T23:59:59.000Z

30

An Intelligent Multi Agent System for Integrated Control & Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

An Intelligent Multi Agent System for Integrated Control & Asset Management of Petroleum Production management system for the offshore oil and gas industry in Atlantic Canada. The research program has achieved several milestones. The conceptual model of an automated asset management system, its architecture

Taylor, James H.

31

Asset Revitalization Initiative ARI  

Broader source: Energy.gov (indexed) [DOE]

Asset Revitalization Initiative Asset Revitalization Initiative ( ARI ) Mission * Community * Reuse ARI is a DOE-wide effort to advance the beneficial reuse of the agency's unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources, and highly skilled workforce. ARI promotes an efficient business environment to encourage collaboration between public and private resources. ARI integrates DOE missions with community interests. ARI is... Our Vision By 2020: Operations are conducted in a sustainable manner; facilities and transit are powered by clean energy. Site infrastructure is modern, adaptable, and efficient. Public-private partnerships thrive and are creating new jobs while helping meet future workforce needs. Local communities are connected to the site, and site activities

32

Real Property Asset Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out our stewardship responsibilities, and will ensure that our facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Cancels: DOE O 430.1A. Chg 1, dated 2-8-08. Chg 2, dated 4-25-11

2003-09-24T23:59:59.000Z

33

Real Property Asset Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out our stewardship responsibilities, and will ensure that our facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Chg 1, dated 2-8-08. Chg 2, dated 4-25-11

2003-09-24T23:59:59.000Z

34

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

35

Substation asset management study  

SciTech Connect (OSTI)

This paper will present an overview of our recent findings in the area of substation asset management and will describe how several utilities, in response to the issues listed above, are re-examining their present maintenance practices in search of more cost-effective programs.

Conroy, M.W.; Conidi, J. [Sargent & Lundy, Chicago, IL (United States)

1996-03-01T23:59:59.000Z

36

Mexico clings to petrochemical assets  

Science Journals Connector (OSTI)

Mexico clings to petrochemical assets ... Responding to political and public pressure, the Mexican government abandoned its already delayed plans to sell a majority stake in government-owned petrochemical assets to domestic and foreign investors. ...

GEORGE PEAFF

1996-10-21T23:59:59.000Z

37

Determining the Appropriate Asset Allocation  

E-Print Network [OSTI]

Asset allocation largely determines the success of one's investments. This publication explains the different types of assets and how to choose the ones that best suit your goals and investment timeline....

Johnson, Jason; Polk, Wade

2002-08-12T23:59:59.000Z

38

Commercial Building Asset Rating Program  

Broader source: Energy.gov [DOE]

Slides from a Commercial Building Initiative webinar outlining the Commercial Building Asset Rating Program on August 23, 2011.

39

INSTITUTE ON ASSETS & SOCIAL POLICY  

E-Print Network [OSTI]

INSTITUTE ON ASSETS & SOCIAL POLICY LIVING LONGER ON LESS IN MASSACHUSETTS: THE NEW ECONOMIC (IN)SECURITY OF SENIORS Tatjana Meschede Laura Sullivan Thomas Shapiro #12;About the Institute on Assets and Social Policy The Institute on Assets and Social Policy (IASP), a research institute at the Heller School for Social Policy

Snider, Barry B.

40

ARI Asset Revitalization Initiative  

Broader source: Energy.gov (indexed) [DOE]

( ( ARI ) Asset Revitalization Initiative Mission * Community * Reuse Highlights continue on Page 2 The Business Incubator Center Wins the NBIA Dinah Atkins Incubator of the Year Award april �, ���� - One of 7,000 incubators in the world and located on the Department of Energy's Grand Junction campus, The Business Incubator Center won the National Business Incubator Association Dinah Atkins Incubator of the Year award in the General and Special Focus category. For

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Architecting global automation systems over a distributed multi-agent infrastructure  

Science Journals Connector (OSTI)

In this work we present an agent-based architecture for Global Automation Systems. The architecture follows a layered abstract model that allows decoupling design responsibilities, promotes high cohesion within layers and clearly emphasizes the environment. ...

Franco Guidi-Polanco; Claudio Cubillos; Giuseppe Menga

2005-06-01T23:59:59.000Z

42

Departmental Radiological Emergency Response Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements and responsibilities for the DOE/NNSA national radiological emergency response assets and capabilities and Nuclear Emergency Support Team assets. Cancels DOE O 5530.1A, DOE O 5530.2, DOE O 5530.3, DOE O 5530.4, and DOE O 5530.5.

2007-06-27T23:59:59.000Z

43

INSTITUTE ON ASSETS & SOCIAL POLICY  

E-Print Network [OSTI]

INSTITUTE ON ASSETS & SOCIAL POLICY Tatjana Meschede Thomas M. Shapiro Laura Sullivan Jennifer Wheary LIVING LONGER ON LESS REPORT #3 #12;DevelopeD by: The Institute on Assets and Social Policy The Heller School for Social Policy and Management Brandeis University in collaboration with: Dmos | www

Snider, Barry B.

44

2014 State of Western's Assets  

SciTech Connect (OSTI)

In this report we document the State of Western’s Assets in terms of physical equipment, financial resources, strategic direction, and human capital, both at the organizational and regional levels. We identify the condition of our assets today and share what work we will be doing in these areas in the coming years.

none,

2014-01-01T23:59:59.000Z

45

Hybrid Control Network Intrusion Detection Systems for Automated Power Distribution Systems  

E-Print Network [OSTI]

and improve the reliability of the distribution system [3].distribution topology for protection and to improve reliability.

Parvania, Masood; Koutsandria, Georgia; Muthukumar, Vishak; Peisert, Sean; McParland, Chuck; Scaglione, Anna

2014-01-01T23:59:59.000Z

46

Life Cycle Asset Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

(The following directives are deleted or consolidated into this Order and shall be phased out as noted in Paragraph 2: DOE 1332.1A; DOE 4010.1A; DOE 4300.1C; DOE 4320.1B; DOE 4320.2A; DOE 4330.4B; DOE 4330.5; DOE 4540.1C; DOE 4700.1). This Order supersedes specific project management provisions within DOE O 430.1A, LIFE CYCLE ASSET MANAGEMENT. The specific paragraphs canceled by this Order are 6e(7); 7a(3); 7b(11) and (14); 7c(4),(6),(7),(11), and (16); 7d(4) and (8); 7e(3),(10), and (17); Attachment 1, Definitions (item 30 - Line Item Project, item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). The remainder of DOE O 430.1A remains in effect. Cancels DOE O 430.1. Canceled by DOE O 413.3.

1998-10-14T23:59:59.000Z

47

Asset Carbon | Open Energy Information  

Open Energy Info (EERE)

Carbon Place: United Kingdom Product: UK-based startup looking to invest in CDMJI projects. References: Asset Carbon1 This article is a stub. You can help OpenEI by expanding...

48

Commercial Building Energy Asset Score Program  

Broader source: Energy.gov [DOE]

Fact sheet summarizing the Building Technologies Program's commercial building energy asset score program

49

Survivability models for the assessment of smart grid distribution automation network designs  

Science Journals Connector (OSTI)

Smart grids are fostering a paradigm shift in the realm of power distribution systems. Whereas traditionally different components of the power distribution system have been provided and analyzed by different teams through different lenses, smart grids ... Keywords: fault tolerance, smart grid, survivability, transient analysis

Alberto Avritzer; Sindhu Suresh; Daniel Sadoc Menasché; Rosa Maria Meri Leão; Edmundo de Souza e Silva; Morganna Carmem Diniz; Kishor Trivedi; Lucia Happe; Anne Koziolek

2013-04-01T23:59:59.000Z

50

Real Property and Asset Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Cancels DOE O 430.1A Chg1.

2003-09-24T23:59:59.000Z

51

Asset Score API Webinar June 14, 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Asset Score API Webinar June 14, 2013 Asset Score API Webinar June 14, 2013 assetscoreapiwebinar061413.wmv More Documents & Publications Commercial Building Energy Asset Score...

52

TROUBLED ASSETS: FINANCIAL EMERGENCIES & RACIALIZED  

E-Print Network [OSTI]

to limit the exposure of banks and the federal mortgage insurance pool to the risks of devaluation (StuartTROUBLED ASSETS: FINANCIAL EMERGENCIES & RACIALIZED RISK1 GREAT CITIES INSTITUTE WORKING PAPER forms for the racialization of credit risk. Focusing on the aftermath of the banking crisis in the late

Illinois at Chicago, University of

53

2013 -2014 Asset Verification Date_______________________  

E-Print Network [OSTI]

% of the current market value minus 50% of the mortgage owed to calculate the "net worth". **If the amount on line with no associated assets, and zero net worth. Describe nature of business. The calculated result was: $_______________________ The amount you reported was

Rosen, Jay

54

2014 -2015 Asset Verification Date_______________________  

E-Print Network [OSTI]

% of the current market value minus 50% of the mortgage owed to calculate the "net worth". **If the amount on line with no associated assets, and zero net worth. Describe nature of business%) if the amount was over $250. The calculated result was: $_______________________ The amount you reported was

Rosen, Jay

55

Reliability Improvements from the Application of Distribution Automation Technologies - Initial Results  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy | December 2012 Table of Contents Executive Summary ................................................................................................................. ii 1. Introduction ..................................................................................................................... 1 1.1 Purpose and Scope ....................................................................................................... 1 1.2 Background on Electric Distribution Reliability ............................................................ 2 1.3 Organization of this Report .......................................................................................... 3 2. Overview of Systems, Devices, and Expected Benefits...................................................... 4

56

EM Contractors for Capital Asset Projects  

Broader source: Energy.gov [DOE]

Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

57

Commercial Building Energy Asset Rating Workshop  

Broader source: Energy.gov [DOE]

DOE commercial building energy asset rating program information presented to stakeholders at the workshop held in Washington, DC, December 2011

58

Commercial Building Asset Rating Program  

Broader source: Energy.gov (indexed) [DOE]

1 eere.energy.gov 1 eere.energy.gov Commercial Building Asset Rating Program August 23, 2011 12 p.m. ET, 9 a.m. PT Presenter: Cody Taylor PRE-DECISIONAL Information included in this document is for discussion purposes and does not constitute the final program design. FOR INFORMATION ONLY 2 eere.energy.gov Outline * Goals * Scope & schedule * Guiding principles * Program design issues - Metrics - Rating method - Rating scale - Opportunities for efficiency improvement - Quality assurance Please submit clarifying questions during today's webinar via the Q&A function of Live Meeting. 3 eere.energy.gov National Building Rating Program Goals * Facilitate cost-effective investment in energy efficiency and reduce energy use in the commercial building sector * Establish a national standard for voluntary commercial building asset rating

59

HANFORD SITE ASSETS AND ATTRIBUTES  

Broader source: Energy.gov (indexed) [DOE]

HANFORD SITE ASSETS AND ATTRIBUTES HANFORD SITE ASSETS AND ATTRIBUTES The Hanford Site provides the opportunity for long-term sustainable energy and industry development. The area boasts a specialized workforce that is highly educated and well-established; is rich in resources including land, infrastructure, low-cost energy, and available workforce; more scientists and engineers per capita than any other area in the Pacific Northwest; and is an optimum location for the development of sustainable energy solutions. Land The Hanford Site is one of the largest remaining land mega-sites available in the United States. * The 586-square-mile Hanford Site includes 39,000 acres designated for industrial use (9,000 acres for R&D). * The Comprehensive Land-Use Plan Environmental Impact Statement allows for a planning process

60

Automated Data Collection for Determining Statistical Distributions of Module Power Undergoing Potential-Induced Degradation: Preprint  

SciTech Connect (OSTI)

We propose a method for increasing the frequency of data collection and reducing the time and cost of accelerated lifetime testing of photovoltaic modules undergoing potential-induced degradation (PID). This consists of in-situ measurements of dark current-voltage curves of the modules at elevated stress temperature, their use to determine the maximum power at 25 degrees C standard test conditions (STC), and distribution statistics for determining degradation rates as a function of stress level. The semi-continuous data obtained by this method clearly show degradation curves of the maximum power, including an incubation phase, rates and extent of degradation, precise time to failure, and partial recovery. Stress tests were performed on crystalline silicon modules at 85% relative humidity and 60 degrees C, 72 degrees C, and 85 degrees C. Activation energy for the mean time to failure (1% relative) of 0.85 eV was determined and a mean time to failure of 8,000 h at 25 degrees C and 85% relative humidity is predicted. No clear trend in maximum degradation as a function of stress temperature was observed.

Hacke, P.; Spataru, S.

2014-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Development of Asset Fault Signatures for Prognostic and Health Management in the Nuclear Industry  

SciTech Connect (OSTI)

Proactive online monitoring in the nuclear industry is being explored using the Electric Power Research Institute’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. The FW-PHM Suite is a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. The FW-PHM Suite has four main modules: Diagnostic Advisor, Asset Fault Signature (AFS) Database, Remaining Useful Life Advisor, and Remaining Useful Life Database. This paper focuses on development of asset fault signatures to assess the health status of generator step-up generators and emergency diesel generators in nuclear power plants. Asset fault signatures describe the distinctive features based on technical examinations that can be used to detect a specific fault type. At the most basic level, fault signatures are comprised of an asset type, a fault type, and a set of one or more fault features (symptoms) that are indicative of the specified fault. The AFS Database is populated with asset fault signatures via a content development exercise that is based on the results of intensive technical research and on the knowledge and experience of technical experts. The developed fault signatures capture this knowledge and implement it in a standardized approach, thereby streamlining the diagnostic and prognostic process. This will support the automation of proactive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

Vivek Agarwal; Nancy J. Lybeck; Randall Bickford; Richard Rusaw

2014-06-01T23:59:59.000Z

62

Allocating Assets in Climates of Extreme Risk  

E-Print Network [OSTI]

is Exposure times Volatility times Correlation," MSCIclasses and asset class volatility levels as part of stressin both high- and low-volatility regimes, and the impact of

Cuffe, Stacy L.; Goldberg, Lisa R.

2011-01-01T23:59:59.000Z

63

ORISE: Asset Readiness Management System (ARMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

64

Building Energy Asset Score Frequently Asked Questions  

Broader source: Energy.gov [DOE]

This page features answers to the most frequently asked questions about the Building Energy Asset Score. Choose from the list of questions below to learn more:

65

Building Technologies Office: Commercial Building Energy Asset Score  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Asset Score Energy Asset Score Photo of a laptop with energy asset score image on the screen The free online Asset Scoring Tool will generate a score based on inputs about the building envelope and buildling systems (heating, ventilation, cooling, lighting, and service hot water). Launch Energy Asset Score The U.S. Department of Energy (DOE) is developing a Commercial Building Energy Asset Score (Asset Score) program to allow building owners and managers to more accurately assess building energy performance. The Asset Score program will act as a national standard and will include the Commercial Building Energy Asset Scoring Tool (Asset Scoring Tool) to evaluate the physical characteristics and as-built energy efficiency of buildings. The Asset Scoring Tool will identify cost-effective energy efficient improvements that, if implemented, can reduce energy bills and potentially improve building asset value. View the Asset Score fact sheet for a brief overview of the program.

66

Asset Revitalization Initiative | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Asset Revitalization Initiative Asset Revitalization Initiative The Asset Revitalization Initiative (ARI) focuses on communicating past efforts and lessons learned from DOE’s long history of asset revitalization and focus current and future efforts to improve the efficiency and effectiveness of future land, asset and facility transfer and beneficial reuse. Since the 1950’s, DOE and its predecessor agencies have completed over 200 transfers of approximately 200,000 acres of land, facilities and other assets for beneficial reuse, including excess fire stations, water treatment plants, water production facilities and other land, assets and facilities that local communities are using to support their civic, economic and social needs. DOE has already supported the cleanup and closure of approximately 90 sites that were involved in US nuclear weapons development and many of these sites are in beneficial reuse. Additional departmental efforts to consolidate mission areas, sites and facilities and reduce the overall operational footprint of the DOE complex across the country will make additional land, assets and facilities available for beneficial reuse.

67

IEEE TRANS. AUTOM. CONTROL, SPECIAL ISSUE ON WIRELESS SENSOR AND ACTUATOR NETWORKS 1 Energy Optimized Topologies for Distributed  

E-Print Network [OSTI]

. We formulate the combinatorial optimization problem of selecting such a minimal energy tree that yield energy efficient bidirectional span- ning trees and establish associated bounds on the optimalIEEE TRANS. AUTOM. CONTROL, SPECIAL ISSUE ON WIRELESS SENSOR AND ACTUATOR NETWORKS 1 Energy

68

Demonstration and Validation Assets: User Manual Development  

SciTech Connect (OSTI)

This report documents the development of a database-supported user manual for DEMVAL assets in the NSTI area of operations and focuses on providing comprehensive user information on DEMVAL assets serving businesses with national security technology applications in southern New Mexico. The DEMVAL asset program is being developed as part of the NSPP, funded by both Department of Energy (DOE) and NNSA. This report describes the development of a comprehensive user manual system for delivering indexed DEMVAL asset information to be used in marketing and visibility materials and to NSTI clients, prospective clients, stakeholders, and any person or organization seeking it. The data about area DEMVAL asset providers are organized in an SQL database with updateable application structure that optimizes ease of access and customizes search ability for the user.

None

2008-06-30T23:59:59.000Z

69

Electric Power System Asset Optimization  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NETL-430/061110 NETL-430/061110 March 7, 2011 430.01.03 Electric Power System Asset Optimization Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or

70

EA-329 Sierra Power Asset Marketing, LLC | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9 Sierra Power Asset Marketing, LLC EA-329 Sierra Power Asset Marketing, LLC Order authorizing Sierra Power Asset Marketing, LLC to export electric energy to Canada EA-329 Sierra...

71

Automation Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

72

Ricmore Capital PLC Formerly Energy Asset Management Plc | Open...  

Open Energy Info (EERE)

Energy Asset Management Plc) Place: United Kingdom Sector: Services Product: Provides Meter Asset Management and energy management services. References: Ricmore Capital PLC...

73

Guidelines for Provision and Interchange of Geothermal Data Assets...  

Energy Savers [EERE]

Guidelines for Provision and Interchange of Geothermal Data Assets Guidelines for Provision and Interchange of Geothermal Data Assets This document presents guidelines related to...

74

Commercial Building Energy Asset Score 2013 Pilot | Department...  

Broader source: Energy.gov (indexed) [DOE]

participation. assetscorepilotoverviewwebinar061713.wmv More Documents & Publications Commercial Building Energy Asset Score 2013 Pilot Asset Score API Webinar June 14, 2013...

75

Commercial Building Energy Asset Score Sample Report | Department...  

Broader source: Energy.gov (indexed) [DOE]

Score Sample Report Commercial Building Energy Asset Score Sample Report Example report showing the results of an energy asset score rating on a building energyassetscoresample...

76

Modeling cross correlations within a many-assets market  

Science Journals Connector (OSTI)

A simple model for simulating cross correlations of a many-assets market is discussed. Correlations between assets are initially considered within the context of the well-known one-factor model, in which a driving term common to all stocks is present. The results are compared to those of real market data corresponding to a set of 445 stocks taken from the Standard and Poors 500 index. The model is further extended by introducing a stochastic volatility within each time series using an autoregressive scheme. This artifical market reproduces the empirically observed fat tails in the distribution function of logarithmic price variations and, more important, leads to additional cross correlations between the time series, in better agreement with the real market behavior.

H. E. Roman; M. Albergante; M. Colombo; F. Croccolo; F. Marini; C. Riccardi

2006-03-28T23:59:59.000Z

77

Home Automation  

E-Print Network [OSTI]

In this paper I briefly discuss the importance of home automation system. Going in to the details I briefly present a real time designed and implemented software and hardware oriented house automation research project, capable of automating house's electricity and providing a security system to detect the presence of unexpected behavior.

Ahmed, Zeeshan

2010-01-01T23:59:59.000Z

78

Real Property Asset Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Site & Facility Restoration » Facility Engineering » Services » Site & Facility Restoration » Facility Engineering » Real Property Asset Management Real Property Asset Management The Real Property Asset Management (RPAM) portion of Deactivation & Decommissioning/Facility Engineering (D&D/FE) presents a driving programmatic challenge within the EM-D&D Clean-up program effort which currently involves 114 sites with 4,900 buildings and other structures which currently account for 28 percent of the Department's assets. The overall goal of RPAM is to ensure sustainment for enduring EM facilities by: Funding maintenance for worker safety and health and mission readiness, Identifying and implementing best practices and lessons learned from existing efforts, and Developing new tools and processes to mitigate risk

79

Asset Pricing with Countercyclical Household Consumption Risk  

E-Print Network [OSTI]

1 Asset Pricing with Countercyclical Household Consumption Risk George M. Constantinides that shocks to household consumption growth are negatively skewed, persistent, and countercyclical and play that drives the conditional cross-sectional moments of household consumption growth. The estimated model

Sadeh, Norman M.

80

Capitalize on Existing Assets with Demand Response  

E-Print Network [OSTI]

Industrial facilities universally struggle with escalating energy costs. EnerNOC will demonstrate how commercial, industrial, and institutional end-users can capitalize on their existing assets—at no cost and no risk. Demand response, the voluntary...

Collins, J.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Modeling Risks in Infrastructure Asset Management  

E-Print Network [OSTI]

The goal of this dissertation research is to model risk in delivery, operation and maintenance phases of infrastructure asset management. More specifically, the two main objectives of this research are to quantify and measure financial risk...

Seyedolshohadaie, Seyed Reza

2012-10-19T23:59:59.000Z

82

Essays in asset pricing and international finance  

E-Print Network [OSTI]

This thesis consists of three chapters in asset pricing and international finance. In Chapter 1, I examine the effect of tradability, the proportion of a firm's output that is exported, on its stock returns. The empirical ...

Tian, Mary

2011-01-01T23:59:59.000Z

83

Commercial Building Energy Asset Rating Workshop  

Broader source: Energy.gov (indexed) [DOE]

BUILDING BUILDING ENERGY ASSET RATING WORKSHOP December 8-9, 2011 Washington, D.C. Nora Wang (Pacific Northwest National Laboratory) Will Gorrissen (Pacific Northwest National Laboratory) Molly McCabe (Hayden Tanner, LLC) Cody Taylor (Department of Energy) 1 I Asset Rating D.C. Workshop eere.energy.gov PRE-DECISIONAL Information included in this document is for discussion purposes and does not constitute the final program design. FOR INFORMATION ONLY 2 I Asset Rating D.C. Workshop eere.energy.gov Program Goals * Facilitate cost-effective investment in energy efficiency and reduce energy use in the commercial building sector * Establish a national standard for voluntary commercial building asset rating * Create a tool to help building owners identify and implement

84

Test Automation Ant JUnit Test Automation  

E-Print Network [OSTI]

Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

Mousavi, Mohammad

85

DOE Commercial Building Energy Asset Score Web Service (Draft)  

SciTech Connect (OSTI)

Documentation of the DOE Commercial Building Energy Asset Score application programming interface (API).

Elliott, Geoffrey; Wang, Na

2013-09-30T23:59:59.000Z

86

Transmission Asset Optimization (and) A Contrarian View of the Future of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Asset Optimization (and) A Contrarian View of the Future of Transmission Asset Optimization (and) A Contrarian View of the Future of Distributed Generation vs. Central Station Generation Speaker(s): Dale Bradshaw Date: June 5, 2000 - 10:00am Location: 90-3148 Seminar Host/Point of Contact: David Faulkner This was a two part seminar: Part One: Transmission Asset Optimization Presentation of latest technology developments that can increase the flow of power over todays transmission lines, thus potentially reducing total costs for transmitting power, while improving transmission reliability. Technologies discussed include FACTs devices, energy storage, etc.) Part Two: A Contrarian View of the Future of Distributed Generation vs. Central Station Generation: There have been a lot claims and hype concerning the relative competitive position in the future of distributed generation (DG)

87

Validity of automated x-ray photoelectron spectroscopy algorithm to determine the amount of substance and the depth distribution of atoms  

Science Journals Connector (OSTI)

The author reports a systematic study of the range of validity of a previously developed algorithm for automated x-ray photoelectron spectroscopy analysis which takes into account the variation in both peak intensity and the intensity in the background of inelastically scattered electrons. This test was done by first simulating spectra for the Au4d peak with gold atoms distributed in the form of a wide range of nanostructures which includes overlayers with varying thickness a 5?Å layer of atoms buried at varying depths and a substrate covered with an overlayer of varying thickness. Next the algorithm was applied to analyze these spectra. The algorithm determines the number of atoms within the outermost 3 ? of the surface. This amount of substance is denoted AOS 3 ? (where ?   is the electron inelastic mean free path). In general the determined AOS 3 ? is found to be accurate to within ?10–20% depending on the depth distribution of the atoms. The algorithm also determines a characteristic length L which was found to give unambiguous information on the depth distribution of the atoms for practically all studied cases. A set of rules for this parameter which relates the value of L to the depths where the atoms are distributed was tested and these rules were found to be generally valid with only a few exceptions. The results were found to be rather independent of the spectral energy range (from 20 to 40?eV below the peak energy) used in the analysis.

Sven Tougaard

2013-01-01T23:59:59.000Z

88

A post-occupancy monitored evaluation of the dimmable lighting, automated shading, and underfloor air distribution system in The New York Times Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

23E 23E A Post-Occupancy Monitored Evaluation of the Dimmable Lighting, Automated Shading, and Underfloor Air Distribution System in The New York Times Building E.S. Lee, L.L. Fernandes, B. Coffey, A. McNeil, R. Clear Lawrence Berkeley National Laboratory T. Webster, F. Bauman, D. Dickerhoff, D. Heinzerling, T. Hoyt University of California Berkeley Windows and Envelope Materials Group Building Technology and Urban Systems Department Environmental Energy Technologies Division January 2013 ! 2 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty,

89

Long-Term Wisconsin Capital Assets Deferral and Wisconsin-Source Asset  

Broader source: Energy.gov (indexed) [DOE]

Long-Term Wisconsin Capital Assets Deferral and Wisconsin-Source Long-Term Wisconsin Capital Assets Deferral and Wisconsin-Source Asset Exclusion Qualified Wisconsin Business Certification (Wisconsin) Long-Term Wisconsin Capital Assets Deferral and Wisconsin-Source Asset Exclusion Qualified Wisconsin Business Certification (Wisconsin) < Back Eligibility Commercial Institutional Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Corporate Tax Incentive Personal Tax Incentives Provider Wisconsin Economic Development Corporation WEDC may certify businesses as a "Qualified Wisconsin Business". The designation allows investors with WI capital gains tax liability to both defer that tax liability and if an investment is maintained for a minimum

90

ASSET LOGISTIC AG | Open Energy Information  

Open Energy Info (EERE)

ASSET LOGISTIC AG ASSET LOGISTIC AG Jump to: navigation, search Name ASSET@LOGISTIC AG Place Hamburg, Hamburg, Germany Zip 20148 Sector Wind energy Product Developer of 3 wind farms in Almeria, Spain Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

91

Century Asset Management | Open Energy Information  

Open Energy Info (EERE)

Asset Management Asset Management Place Sydney, New South Wales, Australia Zip 2000 Sector Solar, Vehicles Product String representation "Sydney based in ... mpleted assets." is too long. Coordinates -33.869629°, 151.206955° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-33.869629,"lon":151.206955,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

92

Commercial Building Energy Asset Score Sample Report  

Broader source: Energy.gov (indexed) [DOE]

COMMERCIAL BUILDING COMMERCIAL BUILDING ENERGY ASSET SCORE 1 SUMMARY BUILDING INFORMATION Example Building 2000 A St., Chicago, IL 60601 Building Type: Mixed-Use Gross Floor Area: 140,000 ft 2 Year Built: 2005 Office: 100,000 ft 2 Retail: 40,000 ft 2 Report #: IL-1234567 Score Date: 02/2013 Building ID #: XXXXX ASSET SCORE DATA LEVEL: ¨ Simple Score ¨ Advanced Score ¨ Verified Advanced Score Current Score Potential Score BUILDING USE TYPES: This report includes a Score for the entire building as well as individual Scores for each of the separate use types. CONTENTS BUILDING ASSET SCORE: * Summary.......................................................... Page 1 * Score................................................................ Pages 2-4 * Upgrade Opportunities

93

Building Technologies Office: Commercial Building Energy Asset Score  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Development to someone by E-mail Program Development to someone by E-mail Share Building Technologies Office: Commercial Building Energy Asset Score Program Development on Facebook Tweet about Building Technologies Office: Commercial Building Energy Asset Score Program Development on Twitter Bookmark Building Technologies Office: Commercial Building Energy Asset Score Program Development on Google Bookmark Building Technologies Office: Commercial Building Energy Asset Score Program Development on Delicious Rank Building Technologies Office: Commercial Building Energy Asset Score Program Development on Digg Find More places to share Building Technologies Office: Commercial Building Energy Asset Score Program Development on AddThis.com... About Take Action to Save Energy Activities 179d Tax Calculator

94

Two Essays in Asset-Pricing  

E-Print Network [OSTI]

TWO ESSAYS IN ASSET-PRICING A Dissertation by ALEXEY PETKEVICH Submitted to the O ce of Graduate Studies of Texas A&M University in partial ful llment of the requirements for the degree of DOCTOR OF PHILOSOPHY August 2011 Major Subject...: Finance TWO ESSAYS IN ASSET-PRICING A Dissertation by ALEXEY PETKEVICH Submitted to the O ce of Graduate Studies of Texas A&M University in partial ful llment of the requirements for the degree of DOCTOR OF PHILOSOPHY Approved by: Co...

Petkevich, Alexey

2012-10-19T23:59:59.000Z

95

A Life Cycle Analysis System to Support D and D, Pollution Prevention, and Asset Recovery  

SciTech Connect (OSTI)

This paper describes a life cycle analysis system (LCAS) developed to support US Department of Energy (DOE) decision-making regarding deactivation and decommissioning (D and D), pollution prevention (P2), and asset recovery, and its deployment to analyze the disposition of facilities and capital assets. Originally developed for use at the Oak Ridge East Tennessee Technology Park, this approach has been refined through application at Ohio Operations Office sites and is now being deployed at a number of DOE sites. Programs such as National Metals Recycle, the D and D Focus Area, P2, and Asset Utilization are successfully using the system to make better decisions resulting in lower cost to the taxpayer and improved environmental quality. The LCAS consists of a user-friendly, cost-effective, and analytically-sound decision-aiding process and a complementary suite of automated tools to handle data administration and multiple criteria life cycle analysis (LCA). LCA is a systematic and comprehensive process for identifying, assessing, and comparing alternatives for D and D, P2, and asset recovery at government sites, and for selecting and documenting a preferred alternative. An LCA includes all of the impacts (benefits and costs) that result from a course of action over the entire period of time affected by the action. The system also includes visualizations that aid communication and help make decision-making transparent. The LCAS has three major components related to data collection, decision alternative assessment, and making the decisions. Each component is discussed in-depth using the example of deployment of the LCAS to support asset recovery.

Bishop, L.; Tonn, B.E.; Yuracko, K.L.

1999-02-28T23:59:59.000Z

96

Asset Management Equipment Disposal Form -Refrigerant Recovery  

E-Print Network [OSTI]

enters the waste stream with the charge intact (e.g., motor vehicle air conditioners, refrigeratorsAsset Management Equipment Disposal Form - Refrigerant Recovery Safe Disposal Requirements Under refrigeration, cold storage warehouse refrigeration, chillers, and industrial process refrigeration) has to have

Sin, Peter

97

FY95 capital asset implementation plan  

SciTech Connect (OSTI)

The Waste Isolation Division (WID) is committed to providing good stewardship for the capital assets under its operational and physical control. To achieve this goal, the WID has developed the Capital Asset Implementation Plan (CAIP) to continue to implement for FY95 Department of Energy (DOE) Order 4320.2A, Capital Asset Management Process (CAMP). The Order provides policy and elements needed to establish a credible, consistent, auditable, and technically sound process for the DOE to forecast, plan, and budget for capital assets on a functional unit level. The objective of the WIPP CAMP program is to meet the goals of DOE Order 4320.2A in the most effective and efficient manner possible in support of the Waste Isolation Pilot Plant (WIPP) mission. As a result, this CAIP provides a way to implement the CAMP Program using a graded approach. Continued implementation will be accomplished by improving the existing process, and establishing future goals to promote growth for the CAMP Program. The CAIP is issued annually by the WID with quarterly progress reports submitted to the DOE. This document describes the current-year program staffing, roles, responsibilities, funding, and near-term milestones. In addition, the results of past goals are discussed.

Not Available

1994-12-01T23:59:59.000Z

98

V-161: IBM Maximo Asset Management Products Java Multiple Vulnerabilities |  

Broader source: Energy.gov (indexed) [DOE]

61: IBM Maximo Asset Management Products Java Multiple 61: IBM Maximo Asset Management Products Java Multiple Vulnerabilities V-161: IBM Maximo Asset Management Products Java Multiple Vulnerabilities May 22, 2013 - 12:46am Addthis PROBLEM: IBM Maximo Asset Management Products Java Multiple Vulnerabilities PLATFORM: IBM Maximo Asset Management 6.x IBM Maximo Asset Management 7.x IBM Maximo Asset Management Essentials 7.x ABSTRACT: Asset and Service Mgmt Products - Potential security exposure when using JavaTM based applications due to vulnerabilities in Java Software Developer Kits. REFERENCE LINKS: IBM Reference #:1638135 Secunia Advisory SA53451 CVE-2013-0401 CVE-2013-2433 CVE-2013-2434 CVE-2013-0402 CVE-2013-1488 CVE-2013-1491 CVE-2013-1518 CVE-2013-1537 CVE-2013-1540 CVE-2013-1557 CVE-2013-1558 CVE-2013-1561 CVE-2013-1563 CVE-2013-1564 CVE-2013-1569

99

V-161: IBM Maximo Asset Management Products Java Multiple Vulnerabilities |  

Broader source: Energy.gov (indexed) [DOE]

1: IBM Maximo Asset Management Products Java Multiple 1: IBM Maximo Asset Management Products Java Multiple Vulnerabilities V-161: IBM Maximo Asset Management Products Java Multiple Vulnerabilities May 22, 2013 - 12:46am Addthis PROBLEM: IBM Maximo Asset Management Products Java Multiple Vulnerabilities PLATFORM: IBM Maximo Asset Management 6.x IBM Maximo Asset Management 7.x IBM Maximo Asset Management Essentials 7.x ABSTRACT: Asset and Service Mgmt Products - Potential security exposure when using JavaTM based applications due to vulnerabilities in Java Software Developer Kits. REFERENCE LINKS: IBM Reference #:1638135 Secunia Advisory SA53451 CVE-2013-0401 CVE-2013-2433 CVE-2013-2434 CVE-2013-0402 CVE-2013-1488 CVE-2013-1491 CVE-2013-1518 CVE-2013-1537 CVE-2013-1540 CVE-2013-1557 CVE-2013-1558 CVE-2013-1561 CVE-2013-1563 CVE-2013-1564 CVE-2013-1569

100

Commercial Building Energy Asset Score Tool Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Score Tool Score Tool Report Commercial Building Energy Asset Score Tool Report Energy Asset Score Report The Energy Asset Score report will be comprised of four sections: Current Asset Score-The source EUI is obtained by performing the whole-building energy simulation using the asset scoring tool; the modeled source EUI is adjusted to account for local climate; the adjusted EUI is compared to a fixed scale to obtain an asset score of 1 to 100. An asset score of 100 represents an ultra-efficient building; a score of 1 represents a very inefficient building in the current commercial building stock. After a building upgrade package is identified, the energy asset scoring tool will calculate the potential energy use after upgrades using standard operating conditions (by use types).

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

An Auditing Process to Improve Asset Management Performance  

Science Journals Connector (OSTI)

An organisation’s maturity in asset management practices and processes can be determined through the application of an asset management audit. The main objective of this study was to develop and validate an as...

J K Visser; J J Mollentze

2006-01-01T23:59:59.000Z

102

Highway Electrification And Automation  

E-Print Network [OSTI]

Electrification and Automation Technologies - RegionalHighway Electrification and Automation Steven E. Shladovertechnology of highway automation,” as well as its belief

Shladover, Steven E.

1992-01-01T23:59:59.000Z

103

Disclosure of asset valuations in corporate annual reports  

E-Print Network [OSTI]

DISCLOSURE OF ASSET VALUATIONS IN CORPORATE ANNUAL REPORTS A Thesis Charles 3. Ponder Approved as to style and content by: Head of Department and Chairman of Committee January 1955 Ll!3RARY A A M COLLEGE OF TEXAS DISCLOSURE OF ASSET... January 1955 Ma)or Subject: Accounting DISCXDSEm OP A88ET VAWATIONS IN COllPQRATE ANNSAI REPORTS IXI Nature of the Probles Xmnmtories Marbetable Seoarities Xavestseuts PAGE 15 V PixeA Assets VII Iataugible Assets Concise isa Bibliograyhy...

Ponder, Charles Bedford

2012-06-07T23:59:59.000Z

104

Commercial Building Energy Asset Scoring Tool Application Programming Interface  

Broader source: Energy.gov [DOE]

slides from June 14, 2013 webinar on the commercial building energy asset scoring tool application programming interface

105

Colorado State University Approval Matrix Capital Assets Account  

E-Print Network [OSTI]

Hierarchy Purchasing PlantFund Surplus ARG_SPONPR N/A Management (FR Doc) 10/7/2009 41Fiscal Officer 9 Manager, freeston,kahrsj Officer Supervisor Property Purchasing Asset Processor Surplus VP Research, Plant Fund Acct, dellison Asset Manager, freeston,kahrsj Officer Supervisor Property Purchasing Asset

Stephens, Graeme L.

106

Preserving Plutonium-244 as a National Asset  

SciTech Connect (OSTI)

Plutonium-244 (244 Pu) is an extremely rare and long-lived isotope of plutonium with a half-life of 80 million years. Measureable amounts of 244 Pu are found in neither reactor-grade nor weapons-grade plutonium. Production of this isotope requires a very high thermal flux to permit the two successive neutron captures that convert 242 Pu to 243 Pu to 244 Pu, particularly given the short (about 5 hour) half-life of 243 Pu. Such conditions simply do not exist in plutonium production processes. Therefore, 244 Pu is ideal for precise radiochemical analyses measuring plutonium material properties and isotopic concentrations in items containing plutonium. Isotope dilution mass spectrometry is about ten times more sensitive when using 244 Pu rather than 242 Pu for determining plutonium isotopic content. The isotope can also be irradiated in small quantities to produce superheavy elements. The majority of the existing global inventory of 244 Pu is contained in the outer housing of Mark-18A targets at the Savannah River Site (SRS). The total inventory is about 20 grams of 244 Pu in about 400 grams of plutonium distributed among the 65 targets. Currently, there are no specific plans to preserve these targets. Although the cost of separating and preserving this material would be considerable, it is trivial in comparison to new production costs. For all practical purposes, the material is irreplaceable, because new production would cost billions of dollars and require a series of irradiation and chemical separation cycles spanning up to 50 years. This paper will discuss a set of options for overcoming the significant challenges to preserve the 244 Pu as a National Asset: (1) the need to relocate the material from SRS in a timely manner, (2) the need to reduce the volume of material to the extent possible for storage, and (3) the need to establish an operational capability to enrich the 244 Pu in significant quantities. This paper suggests that if all the Mark-18A plutonium is separated, it would occupy a small volume and would be inexpensive to store while an enrichment capability is developed. Very small quantities could be enriched in existing mass separators to support critical needs.

Patton, Bradley D [ORNL; Alexander, Charles W [ORNL; Benker, Dennis [ORNL; Collins, Emory D [ORNL; Romano, Catherine E [ORNL; Wham, Robert M [ORNL

2011-01-01T23:59:59.000Z

107

Asset Revitalization Initiative Update by Cynthia Anderson and David Geiser  

Broader source: Energy.gov (indexed) [DOE]

Asset Revitalization Initiative Briefing Asset Revitalization Initiative Briefing www.doe.gov Asset Revitalization Initiative 1 Sustainability Efficiency Community The Asset Revitalization Initiative Briefing October 2011 LEARN FROM AND TAKE CREDIT FOR PAST ASSET REVITALIZATION EFFORTS * We supported the cleanup and closure of ~ 90 sites that had a role in winning the Cold War; most of those sites are in beneficial reuse. * Since 2005, we have sold > 475,000 ft 2 of real property, both The U.S. Department of Energy (DOE) has a long history of asset revitalization. We need to do a better job of communicating those efforts and learning from them. www.doe.gov 2 Asset Revitalization Initiative Sustainability Efficiency Community * Since 2005, we have sold > 475,000 ft of real property, both land and buildings. An additional 36,000 ft

108

Petri Net Based Research of Home Automation Communication Protocol  

Science Journals Connector (OSTI)

The popularity of home automation has been increasing greatly in recent years. ... distributed, uncertain or randomized protocol model) of home automation, many questions concerned. For instance, is ... net to de...

Guangxuan Chen; Yanhui Du; Panke Qin; Jin Du…

2013-01-01T23:59:59.000Z

109

Life Cycle Asset Management - Quality Assurance -  

Broader source: Energy.gov (indexed) [DOE]

17 17 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management Contents GPG-FM-017 March 1996 iii ACKNOWLEDGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Graded Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2. PRINCIPLES AND PROCESSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Goals, Principles and Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1.1 Quality Assurance Goals and Principles . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1.2 Quality Assurance Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.2 Quality Assurance and Project Phases . . . . .

110

ECO2 Asset Solutions | Open Energy Information  

Open Energy Info (EERE)

ECO2 Asset Solutions ECO2 Asset Solutions Jump to: navigation, search Name ECO2 Asset Solutions Place Tampa, Florida Sector Carbon, Services Product Florida-based provider of advisory services to both buyers and sellers on the Carbon Markets. They serve a broad range of stakeholders including foresters, municipalities, agriculture and carbon credit buyers. Coordinates 27.94653°, -82.459269° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.94653,"lon":-82.459269,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

111

12 - Advanced gas turbine asset and performance management  

Science Journals Connector (OSTI)

Abstract: A gas turbine degrades with use. The causes of degradation can often be related to the operating environment of the machine. Its consequent performance and other symptoms and changes are outlined in this chapter. Instrumentation in the engine can give, through a suitable analysis, useful clues that can benefit rectification of the causes of degradation. The interpretation of the information can be done effectively through specialist centres that can, remotely, receive information from different plants distributed widely geographically. They can handle disparate types of data coming through a range of streams. These features place complex requirements on information processing, analysis, staff preparation and management practice. This gives rise to the seven levels of gas path management: sensor, control and supervision, condition monitoring, performance and health assessment, prognostics, decision support and, finally, asset management.

T. Álvarez Tejedor; R. Singh; P. Pilidis

2013-01-01T23:59:59.000Z

112

Building Technologies Office: Commercial Building Energy Asset Scoring Tool  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scoring Tool to someone by E-mail Scoring Tool to someone by E-mail Share Building Technologies Office: Commercial Building Energy Asset Scoring Tool on Facebook Tweet about Building Technologies Office: Commercial Building Energy Asset Scoring Tool on Twitter Bookmark Building Technologies Office: Commercial Building Energy Asset Scoring Tool on Google Bookmark Building Technologies Office: Commercial Building Energy Asset Scoring Tool on Delicious Rank Building Technologies Office: Commercial Building Energy Asset Scoring Tool on Digg Find More places to share Building Technologies Office: Commercial Building Energy Asset Scoring Tool on AddThis.com... About Take Action to Save Energy Activities 179d Tax Calculator Advanced Energy Design Guides Advanced Energy Retrofit Guides Building Energy Data Exchange Specification

113

U.S. DOE Commercial Building Energy Asset Score  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Score Commercial Building Energy Asset Score Quick Start Guide To create a Commercial Building Energy Asset Score (Asset Score) for your building you need to complete the following six (6) steps using the Commercial Building Energy Asset Scoring Tool (Asset Scoring Tool). Although you are not required to carry out these steps in a specific order, the following sequence will most likely save you time. Input Basic Building Information * Click the New Building button to begin. * Enter building name, location, gross floor area, and year of construction. * Click the button to continue. Identify Building Use Type(s) * Select all applicable use types. * Choose from a variety of options including office, retail, multi-family, education, and

114

Commercial Building Energy Asset Score: 2013 Pilot Overview  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Score: Commercial Building Energy Asset Score: 2013 Pilot Overview June 17, 2013 Joan Glickman, DOE Patty Kappaz, SRA 1 eere.energy.gov Agenda � Team Introduction � Commercial Building Energy Asset Score Update * Program overview * Progress to date * Objectives of the 2013 Pilot * Future plans � Process for Pilot Participation 2 I Energy Asset Score eere.energy.gov � � � � � � � Meet the Team U.S. Department of Energy (DOE) Project oversight Strategic direction Policy perspective Pacific Northwest National Laboratory (PNNL) Technical lead Scoring Tool development and maintenance SRA International (SRA) Pilot management Outreach and communications 3 I Energy Asset Score eere.energy.gov Program Goals * Develop a national energy asset rating to --

115

Building Technologies Office: Commercial Building Energy Asset Score Tool  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tool Report to someone by E-mail Tool Report to someone by E-mail Share Building Technologies Office: Commercial Building Energy Asset Score Tool Report on Facebook Tweet about Building Technologies Office: Commercial Building Energy Asset Score Tool Report on Twitter Bookmark Building Technologies Office: Commercial Building Energy Asset Score Tool Report on Google Bookmark Building Technologies Office: Commercial Building Energy Asset Score Tool Report on Delicious Rank Building Technologies Office: Commercial Building Energy Asset Score Tool Report on Digg Find More places to share Building Technologies Office: Commercial Building Energy Asset Score Tool Report on AddThis.com... About Take Action to Save Energy Activities 179d Tax Calculator Advanced Energy Design Guides Advanced Energy Retrofit Guides

116

Commercial Building Energy Asset Scoring Tool | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Scoring Tool Scoring Tool Commercial Building Energy Asset Scoring Tool This Asset Scoring Tool will guide your data collection, store your building information, and generate Asset Scores and system evaluations for your building envelope and building systems. The Asset Scoring Tool will also identify cost-effective upgrade opportunities and help you gain insight into the energy efficiency potential of your building. Key Features The Asset Scoring Tool will generate an Asset Score Report that will provide: A whole-building energy efficiency score based on the building envelope and building systems (heating, ventilation, cooling, lighting and service hot water). An evaluation of the current building systems that identifies inefficient building systems A set of opportunities to save energy and money

117

Commercial Building Energy Asset Score Frequently Asked Questions |  

Broader source: Energy.gov (indexed) [DOE]

Frequently Asked Questions Frequently Asked Questions Commercial Building Energy Asset Score Frequently Asked Questions The U.S. Department of Energy's (DOE) Commercial Building Energy Asset Score program has received numerous questions from building owners and operators, state and local governments, realtors, and other stakeholders interested in learning more about the Commercial Building Energy Asset Score. Responses to some of the most frequently asked questions can be found below within the following categories: Program Overview Development Schedule and Pilot Testing Understanding the Asset Score Report and Using the Asset Scoring Tool Scoring Methodology Scoring Scales Identified Opportunities for Energy Efficiency Upgrades Quality Assurance Links to Other Tools Program Overview Q: What is the Commercial Building Energy Asset Score?

118

North Brawley Power Plant Asset Impairment Analysis | Open Energy  

Open Energy Info (EERE)

North Brawley Power Plant Asset Impairment Analysis North Brawley Power Plant Asset Impairment Analysis Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: North Brawley Power Plant Asset Impairment Analysis Author Giza Singer Even Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for North Brawley Power Plant Asset Impairment Analysis Citation Giza Singer Even. North Brawley Power Plant Asset Impairment Analysis [Internet]. [updated 2012;cited 2012]. Available from: http://www.sec.gov/Archives/edgar/data/1296445/000119312512118396/d316623dex991.htm Retrieved from "http://en.openei.org/w/index.php?title=North_Brawley_Power_Plant_Asset_Impairment_Analysis&oldid=682476" Categories: References

119

Nuclear Materials: Reconsidering Wastes and Assets - 13193  

SciTech Connect (OSTI)

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable ('assets') to worthless ('wastes'). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or - in the case of high level waste - awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site's (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as 'waste' include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest. (authors)

Michalske, T.A. [Savannah River National Laboratory (United States)] [Savannah River National Laboratory (United States)

2013-07-01T23:59:59.000Z

120

Optimizing Asset Utilization and Operating Efficiency Efficiently, June  

Broader source: Energy.gov (indexed) [DOE]

Optimizing Asset Utilization and Operating Efficiency Efficiently, Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Smart Grid Implementation Workshop Breakout Group Report, a discussion of metrics for smart grid implementation. The following major caveats and findings were identified: Optimizing asset utilization and operating efficiently depends on proper integration of technologies with business processes and associated IT Build metrics, by definition, need to be updated regularly to reflect new technology Build metrics should not be technology prescriptive or result innarrowing technology options for Smart Grid (should be as "technology agnostic"as possible) Build metrics need to differentiate between statistics

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Optimizing Asset Utilization and Operating Efficiency Efficiently, June  

Broader source: Energy.gov (indexed) [DOE]

Optimizing Asset Utilization and Operating Efficiency Efficiently, Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Smart Grid Implementation Workshop Breakout Group Report, a discussion of metrics for smart grid implementation. The following major caveats and findings were identified: Optimizing asset utilization and operating efficiently depends on proper integration of technologies with business processes and associated IT Build metrics, by definition, need to be updated regularly to reflect new technology Build metrics should not be technology prescriptive or result innarrowing technology options for Smart Grid (should be as "technology agnostic"as possible) Build metrics need to differentiate between statistics

122

Impact of asset usage preferences on parallel replacement decisions.  

E-Print Network [OSTI]

??Data from a state department of transportation fleet shows that the usage of a typical asset decreases as it ages. One possible explanation for decreasing… (more)

Wagner, Tristan John

2010-01-01T23:59:59.000Z

123

EMAB Briefing on Capital Assets Projects and Operations Activities...  

Office of Environmental Management (EM)

Asset Projects and Operations Activities www.em.doe.gov 1 Presented to Environmental Management Advisory Boards Mark Gilbertson Deputy Assistant Secretary for Site Restoration...

124

Commercial Building Energy Asset Score: Pilot Findings and Program Update  

Broader source: Energy.gov [DOE]

The webinar was held on April 16, 2014, to share the findings from the 2013 Pilot and provide a program update on the Commercial Building Energy Asset Score.

125

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Energy.gov [DOE]

This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental...

126

Guidelines for Provision and Interchange of Geothermal Data Assets  

Broader source: Energy.gov [DOE]

This document presents guidelines related to provision and interchange of data assets in the context of the National Geothermal Data System.

127

Asset Revitalization Initiative Update by Cynthia Anderson and...  

Office of Environmental Management (EM)

use assets (e.g., excess facilities and materials) or privatize services (e.g., wastewater treatment, emergency response). * Reassess the Secretarial moratorium and suspension...

128

The Robo-AO automated intelligent queue system  

E-Print Network [OSTI]

Robo-AO is the first automated laser adaptive optics instrument. In just its second year of scientific operations, it has completed the largest adaptive optics surveys to date, each comprising thousands of targets. Robo-AO uses a fully automated queue scheduling system that selects targets based on criteria entered on a per observing program or per target basis, and includes the ability to coordinate with US Strategic Command automatically to avoid lasing space assets. This enables Robo-AO to select among thousands of targets at a time, and achieve an average observation rate of approximately 20 targets per hour.

Riddle, Reed L; Papadopoulos, Athanasios; Baranec, Christoph; Law, Nicholas M

2014-01-01T23:59:59.000Z

129

Role of Standard Demand Response Signals for Advanced Automated Aggregation  

SciTech Connect (OSTI)

Emerging standards such as OpenADR enable Demand Response (DR) Resources to interact directly with Utilities and Independent System Operators to allow their facility automation equipment to respond to a variety of DR signals ranging from day ahead to real time ancillary services. In addition, there are Aggregators in today’s markets who are capable of bringing together collections of aggregated DR assets and selling them to the grid as a single resource. However, in most cases these aggregated resources are not automated and when they are, they typically use proprietary technologies. There is a need for a framework for dealing with aggregated resources that supports the following requirements: • Allows demand-side resources to participate in multiple DR markets ranging from wholesale ancillary services to retail tariffs without being completely committed to a single entity like an Aggregator; • Allow aggregated groups of demand-side resources to be formed in an ad hoc fashion to address specific grid-side issues and support the optimization of the collective response of an aggregated group along a number of different dimensions. This is important in order to taylor the aggregated performance envelope to the needs to of the grid; • Allow aggregated groups to be formed in a hierarchical fashion so that each group can participate in variety of markets from wholesale ancillary services to distribution level retail tariffs. This paper explores the issues of aggregated groups of DR resources as described above especially within the context of emerging smart grid standards and the role they will play in both the management and interaction of various grid-side entities with those resources.

Lawrence Berkeley National Laboratory; Kiliccote, Sila

2011-11-18T23:59:59.000Z

130

Protecting high value assets in transit  

SciTech Connect (OSTI)

This paper reports that one of the most daunting tasks facing a security manager is how to protect classified or high value assets such as nuclear materials in transit, especially when the shipment is to be handled by a commercial carrier. There are many opportunities for an adversary to gain access to cargo shipments en route, including situations in which the cargo must be held in storage for weeks or even months. Standard commercial alarm systems are not suitable for use in containers subject to vibration or high and low temperature extremes, or situations in which national assets might be used to gain surreptitious access to the container and to defeat the alarm system. A new alarm monitoring system has been developed to provide a secure auditing system for use in rail cars, Conex containers, and other transportable containers. The system, referred to as the PEL-100, electronically supervises intrusion detection sensors mounted on or within a container, and records all intrusion attempts in a secure, solid state memory storage device. The security archive can be withdrawn and reviewed after the container has completed its travels, and will provide a complete audit trail of intrusion attempts in transit. The PEL-100 includes one of the most comprehensive security tamper systems ever fielded, and is intended to operate reliably and securely in an environment subject to vibration, EMI/RFI emissions, electronic spoofing, and physical manipulation. The unit provides a clear and unambiguous indication of tampering and includes a comprehensive internal security system to detect insider tampering.

Tennefoss, M. (Stellar Systems, Inc. (US))

1991-01-01T23:59:59.000Z

131

Automating the Transfer of a Generic Set of Behaviors Onto a Virtual Character  

E-Print Network [OSTI]

of specialists, despite the broad availability of the models, assets and simulation environments. To address this problem, we present a system that allows the rapid incorpo- ration of high-fidelity humanoid 3D modelsAutomating the Transfer of a Generic Set of Behaviors Onto a Virtual Character Andrew Feng1

Kallmann, Marcelo

132

Automation Performance Index.  

E-Print Network [OSTI]

??Automation is intended to improve overall building performance. Building Automation Systems (BAS) are attractive and popular due to their promise of increased operational effectiveness. BAS… (more)

Makarechi, Shariar

2006-01-01T23:59:59.000Z

133

Views on Automation  

Science Journals Connector (OSTI)

Views on Automation ... Industrial managements, he feels, must allay workers' fears by showing how they can take pride in the greater accomplishment of automated plants. ...

1957-07-29T23:59:59.000Z

134

IBM asset and service management solutions White paper  

E-Print Network [OSTI]

; facilities such as parks, schools, or water/wastewater treatment plants; and linear assets like electrical. Page 2 #12;Introduction In today's economic and regulatory climate, municipal government agencies to change. These islands of data cannot aggregate information about assets in a way that supports executive

135

Using Smart Grid Technologies to Modernize Distribution Infrastructure...  

Office of Environmental Management (EM)

reactive power consumption, and improved asset utilization, capacity management, and energy efficiency. This subproject includes the installation of pole mounted distribution...

136

Microsoft Word - RealPropertyAssetManagement.doc  

Broader source: Energy.gov (indexed) [DOE]

Real Property Asset Management Real Property Asset Management On February 4, 2004, the President issued Executive Order (EO) 13327- Federal Real Property Asset Management. The Order promotes the efficient and economical use of Federal real property resources in accordance with their value as national assets and in the best interests of the Nation. It established an interagency Federal Real Property Council (FRPC), chaired by the Deputy Director for Management at the Office of Management and Budget, to establish and promote appropriate guidelines on the management of the Federal real property portfolio. In conjunction with the Executive Order, the Federal Real Property Asset Management Program Initiative was added to the President's Management Agenda, The President's Management Agenda initiative and the efforts of the FRPC are

137

Introduction to NABI and Asset Building in Native Communities Webinar |  

Broader source: Energy.gov (indexed) [DOE]

Introduction to NABI and Asset Building in Native Communities Introduction to NABI and Asset Building in Native Communities Webinar Introduction to NABI and Asset Building in Native Communities Webinar May 23, 2013 2:00PM EDT Webinar The Administration for Children and Families Office of Community Services and Administration for Native Americans invite you to participate in two pre-application webinars introducing the 2013 Native Asset Building Initiative (NABI) funding opportunity. During these webinars, you will learn: Details of the 2013 NABI funding opportunity, including application requirements and how to leverage additional funding Proven strategies to strengthen financial literacy and wealth creation among low-income Native populations How to design and manage a successful asset building project in a Native community.

138

Department of Energy Establishes Asset Revitalization Task Force |  

Broader source: Energy.gov (indexed) [DOE]

Establishes Asset Revitalization Task Force Establishes Asset Revitalization Task Force Department of Energy Establishes Asset Revitalization Task Force February 17, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 Washington, D.C. - Secretary of Energy Steven Chu today announced the establishment of a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy, communities around DOE sites, nonprofits, tribal governments, the private sector and other stakeholders to identify reuse approaches as environmental cleanup efforts reach completion. The task force will explore opportunities to reutilize DOE site assets for beneficial purposes, which may include clean energy development, environmental sustainability projects, open space or other uses. "For decades, Department of Energy sites and their surrounding

139

ASM Asset Management DTVM SA | Open Energy Information  

Open Energy Info (EERE)

Management DTVM SA Management DTVM SA Jump to: navigation, search Name ASM Asset Management DTVM SA Place Rio de Janeiro, Rio de Janeiro, Brazil Zip 22640-100 Sector Carbon, Services Product Brazilian fund manager. It provides a range of financial services, including carbon finance and derivatives for both carbon project developers and investors. References ASM Asset Management DTVM SA[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ASM Asset Management DTVM SA is a company located in Rio de Janeiro, Rio de Janeiro, Brazil . References ↑ "ASM Asset Management DTVM SA" Retrieved from "http://en.openei.org/w/index.php?title=ASM_Asset_Management_DTVM_SA&oldid=34236

140

Department of Energy Announces Next Steps for Asset Revitalization  

Broader source: Energy.gov (indexed) [DOE]

Next Steps for Asset Revitalization Next Steps for Asset Revitalization Initiative Department of Energy Announces Next Steps for Asset Revitalization Initiative September 16, 2011 - 11:49am Addthis WASHINGTON, DC - The Department of Energy today announced next steps under the Asset Revitalization Initiative, a Department-wide initiative to examine ways to work with local communities to support the reuse of DOE resources at former Cold War weapons sites around the country. These steps build on the recommendations from the Task Force on Asset Revitalization, which was convened by Secretary Chu in February 2011, and will facilitate local efforts to support beneficial reuse options at DOE sites, including reindustrialization, manufacturing, clean energy development, nature preserves, and educational centers.

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Commercial Building Energy Asset Score 2013 Pilot | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2013 Pilot 2013 Pilot Commercial Building Energy Asset Score 2013 Pilot DOE conducted its first pilot test of the Asset Score in 2012. Findings from that pilot have led to improvements in the overall program and the Asset Scoring Tool. The current program includes the following new features: Enhanced Asset Scoring Tool capabilities, including the ability to score complex buildings and the following building types: multifamily, lodging, libraries, court houses and mixed use. Retail, office, schools, and unrefrigerated warehouses were part of the 2012 Pilot and will continue to be included in the 2013 Pilot. Improved usability, including clearer input definitions, an enhanced user interface, and the ability for multiple users to edit one building Reduced data requirements to generate a simple Asset Score

142

Future Energy Assets LP | Open Energy Information  

Open Energy Info (EERE)

LP LP Jump to: navigation, search Name Future Energy Assets LP Place Austin, Texas Zip 78701 Product String representation "Future Energy A ... S and in China." is too long. Coordinates 30.267605°, -97.742984° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.267605,"lon":-97.742984,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

143

real_property_asset_ver_10.indd  

Broader source: Energy.gov (indexed) [DOE]

Management, Budget and Evaluation. The point of contact for this document is Eduard A. Dailide, P Management, Budget and Evaluation. The point of contact for this document is Eduard A. Dailide, P .E. who can be reached at (202) 586-5422 or by e-mail to ed.dailide@hq.doe.gov. Cover Photo: Night, in the form of a crescent moon, overtakes the fading light of day beyond Wilson Hall at Fermi National Accelerator Laboratory. i DEPUTY SECRETARY'S MESSAGE I am proud to present the Department of Energy's 2005 Real Property Asset Management Plan. The success of the Department of Energy in meet- ing its mission is directly linked to the effi cient and effective management of its real property portfolio. The portfolio is comprised of diverse, technically complex, and one-of-a-kind facilities with a value of over $77 billion. It is a mission enabler not only

144

Where Did All the Money Go? Congress approved the Troubled Asset Relief Program (TARP) to jump start the credit  

E-Print Network [OSTI]

Where Did All the Money Go? Congress approved the Troubled Asset Relief Program (TARP) to jump forward that unfortunately remains vague. Inexplicably, the TARP II money did not come with a mandate to use the money to increase lending. Now, covenants come with the distribution of the remaining TARP

Ahmad, Sajjad

145

Commercial Buildings: Asset Scoring Efforts and Request for Information: February 2013 webinar  

Broader source: Energy.gov [DOE]

webinar providing an overview of the commercial building energy asset program, the energy asset scoring tool, and a recently issued RFI

146

E-Print Network 3.0 - asset price movements Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Detailed information regarding the Asset Information System can be found at the FIS Help... web page (http:fishelp.wustl.edu, see Documentation, Asset). If you or other...

147

Guarantee Asset Program (New Hampshire) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guarantee Asset Program (New Hampshire) Guarantee Asset Program (New Hampshire) Guarantee Asset Program (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Institutional Investor-Owned Utility Municipal/Public Utility Retail Supplier Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Home Weatherization Water Solar Wind Program Info State New Hampshire Program Type Loan Program Provider NH Business Finance Authority The Guarantee Asset Program provides indirect financing to capital-intensive companies by guaranteeing up to 90% of a bank loan. To be eligible for a loan through GAP, a New Hampshire business must have at least 25 full-time employees, and provide collateral with a recent market

148

Retirement planning in individual asset–liability management  

Science Journals Connector (OSTI)

......figures and operational approaches currently in use within...asset and liability management for individual investors...Operations Research and Management Science. New York: Springer...Operations Research and Management Science, chapter 5. New......

Giorgio Consigli; Gaetano Iaquinta; Vittorio Moriggia; Massimo di Tria; Davide Musitelli

2012-10-01T23:59:59.000Z

149

Newly Developed IT Asset Tools Enhance Cybersecurity Innovation  

Broader source: Energy.gov [DOE]

The Office of the Chief Information Officer (OCIO) has leveraged its own IT Asset Management (ITAM) data to further enhance Department of Energy (DOE) cybersecurity awareness and prevention.  We...

150

Commercial Building Energy Asset Score 2013 Pilot Data Collection Form  

Broader source: Energy.gov [DOE]

This form is intended to facilitate your data collection. The Energy Asset Scoring Tool uses the “block” concept to simplify your building geometry. Most buildings can be scored as one block

151

Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Manual is to provide requirements and guidance to Department of Energy (DOE) employees, including National Nuclear Security Administration (NNSA) employees on the planning and acquisition of capital assets. Does not cancel other directives.

2003-03-28T23:59:59.000Z

152

Commercial Building Energy Asset Score Features | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Score Score Features Commercial Building Energy Asset Score Features The Asset Scoring Tool evaluates buildings by use type. The initial version of the Asset Scoring Tool included: office, school, retail, and unrefrigerated warehouse buildings. Phase II currently under development, which will be used for the 2013 Pilot, includes library, lodging, multi-family housing, and courthouse buildings, as well as mixed-use types of buildings that incorporate Phase I and II. You can enter small and large commercial buildings, and an Asset Score will be equally applicable to new and existing buildings. Inputs You can enter these building characteristics: General information-number of floors, footprint dimension, orientation, and use type Envelope components-roof, exterior wall, and floor types and

153

The efficient frontier for a portfolio that includes one risk-free asset  

Science Journals Connector (OSTI)

This paper presents a description of the efficient frontier of a portfolio composed by three assets, including a risk-free asset. We use a data analysis method to obtain two classes of assets and then we estimate the risk of each asset corresponding ... Keywords: efficient frontier, optimization, portfolio selection, principal component analysis, risk estimation

Florentin Serban; Maria Viorica Stefanescu; Silvia Dedu

2011-07-01T23:59:59.000Z

154

Asset Management System (AMS) for Property Custodians Quick Reference Guide Page 1 of 31  

E-Print Network [OSTI]

Asset Management System (AMS) for Property Custodians ­ Quick Reference Guide Page 1 of 31 Accessing the Asset Management System (AMS) 1) Sign into MyLSU #12;Asset Management System (AMS Management" 3) When you see the SSO Welcome screen (above), click "OK". #12;Asset Management System (AMS

Stephens, Jacqueline

155

Home Automation System; Automation i hemmet.  

E-Print Network [OSTI]

?? This project revolves around creating a home automation system prototype with the main focus being the ability to lock/unlock a door through the internet.… (more)

Ruwaida,, Bassam

2013-01-01T23:59:59.000Z

156

Automation of organic elemental analysis  

Science Journals Connector (OSTI)

Automation of organic elemental analysis ... Describes the development and design of an apparatus for automated organic elemental analysis. ...

Velmer B. Fish

1969-01-01T23:59:59.000Z

157

Automation in biological crystallization  

Science Journals Connector (OSTI)

Automation is the response to overcoming the crystallization bottleneck in biological crystallography. This review provides a summary of the current methods and technologies applied in automated platforms for the setup of initial and follow-up crystallization experiments.

Shaw Stewart, P.

2014-05-28T23:59:59.000Z

158

Digital Control for Automation  

Science Journals Connector (OSTI)

GREATER YIELDS OF BETTER QUALITY PRODUCTS at reduced costs: That's one way to look at automations goal. And among instruments for automation are data reduction systems (others: continuous process analyzers, computer elements, and control mechanisms). ...

1956-04-02T23:59:59.000Z

159

AUTOMATION: Hints from OCAW  

Science Journals Connector (OSTI)

AUTOMATION: Hints from OCAW ... Labor and management need more, not less, collective bargaining in automated industries, he told a Houston, Tex., meeting of the Petro Group of the South Texas Section of the American Institute of Chemical Engineers. ...

1969-06-30T23:59:59.000Z

160

Definition: Automated Islanding And Reconnection | Open Energy Information  

Open Energy Info (EERE)

Islanding And Reconnection Islanding And Reconnection Jump to: navigation, search Dictionary.png Automated Islanding And Reconnection Automated Islanding and Reconnection Automated islanding and reconnection is achieved by automated separation and subsequent reconnection (autonomous synchronization) of an independently operated portion of the T&D system (i.e., microgrid) from the interconnected electric grid. A microgrid is an integrated energy system consisting of interconnected loads and distributed energy resources which, as an integrated system, can operate in parallel with the grid or as an island.[1] View on Wikipedia Wikipedia Definition Islanding refers to the condition in which a distributed (DG) generator continues to power a location even though electrical grid power

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Theorie des langages Automates finis  

E-Print Network [OSTI]

Th´eorie des langages Automates finis Elise Bonzon http://web.mi.parisdescartes.fr/ bonzon/ elise.bonzon@parisdescartes.fr 1 / 51 Th´eorie des langages #12;Automates finis Automates finis Introduction Formalisation Repr´erations sur les automates Automates finis et langages 2 / 51 Th´eorie des langages #12;Automates finis

Bonzon, Elise

162

Multiplex automated genome engineering  

DOE Patents [OSTI]

The present invention relates to automated methods of introducing multiple nucleic acid sequences into one or more target cells.

Church, George M; Wang, Harris H; Isaacs, Farren J

2013-10-29T23:59:59.000Z

163

Congress Likes Automation  

Science Journals Connector (OSTI)

Congress Likes Automation ... Industry is generally aware of its responsibilities to worker replaced by automation, Congressional group concludes after broad study ... No NEW LEGISLATION or legislative changes are required to keep pace with the impact of automation on the national economy, concludes Rep. Wright Patman (D.-Tex.). ...

1955-11-07T23:59:59.000Z

164

Joint Genome Institute's Automation Approach and History  

E-Print Network [OSTI]

Joint Genome Institute’s Automation Approach and Historythroughput environment; – automation does not necessarilyissues “Islands of Automation” – modular instruments with

Roberts, Simon

2006-01-01T23:59:59.000Z

165

Definition: Automated Capacitors | Open Energy Information  

Open Energy Info (EERE)

Capacitors Capacitors Jump to: navigation, search Dictionary.png Automated Capacitors Capacitors can increase the voltage on a distribution circuit by providing reactive power (often referred to as volt-amperes-reactive or VArs). Capacitor banks are switched in discrete steps, either manually, or in response to the voltage at the location where they are connected; typically, distribution capacitor banks are switched in a single step. If the voltage falls too far below the set point, the capacitor is switched in to raise the voltage. If the voltage rises too high above the set point, the capacitor is switched out to lower the voltage. Automated capacitors can be switched in coordination with other voltage control devices with signals from local sensors, distribution automation systems, or grid

166

Department of Energy Establishes Asset Revitalization Task Force  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thursday, February 17, 2011 Thursday, February 17, 2011 Department of Energy Establishes Asset Revitalization Task Force Washington, D.C. � Secretary of Energy Steven Chu today announced the establishment of a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy, communities around DOE sites, nonprofits, tribal governments, the private sector and other stakeholders to identify reuse approaches as environmental cleanup efforts reach completion. The task force will explore opportunities to reutilize DOE site assets for beneficial purposes, which may include clean energy development, environmental sustainability projects, open space or other uses. �For decades, Department of Energy sites and their surrounding communities have played a vital role in supporting the nation�s nuclear

167

Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Scoring Tool Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session NORA WANG SUPRIYA GOEL GEOFF ELLIOTT Pacific Northwest National Laboratory JUNE 18, 2013 Meet the Team U.S. Department of Energy (DOE) � Project oversight � Strategic direction � Policy perspective Pacific Northwest National Laboratory (PNNL) � Technical lead � Scoring Tool development and maintenance SRA International (SRA) � Pilot management � Outreach and communications 2 I Energy Asset Score eere.energy.gov Pilot Participation Process 1. Sign the Pilot Participation Agreement by June 26 2. Provide DOE with points of contact for lead project coordinator and data collector(s)/tool user(s) by June 26 3. DOE provides Pilot Participants with username and password to

168

Pulse Asset Management GmbH | Open Energy Information  

Open Energy Info (EERE)

Pulse Asset Management GmbH Pulse Asset Management GmbH Jump to: navigation, search Name Pulse Asset Management GmbH Place Hamburg, Germany Zip 20354 Sector Solar Product Hamburg-based investor in solar projects in Europe. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

169

Process Development Automation:? An Evolutionary Approach  

Science Journals Connector (OSTI)

Process Development Automation:? An Evolutionary Approach ... In contrast, standard laboratory equipment already contains some automated capabilities but is normally unused in our automation strategies. ... What Can Be Automated? ...

Mike Pollard

2001-04-27T23:59:59.000Z

170

Statement on Department of Energy's Major System Capital Asset Projects  

National Nuclear Security Administration (NNSA)

Department of Energy's Major System Capital Asset Projects Department of Energy's Major System Capital Asset Projects before the House Committee on Appropriations Subcommittee on Energy & Water Development | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > Statement on Department of Energy's Major System ...

171

An Automation System for Optimizing a Supply Chain Network Design under the Influence of Demand Uncertainty  

E-Print Network [OSTI]

Automation . . . . . . . . . . . . . . . . . . . . . . iii 3Automation . . . . . . . . . . . . . . . . . . . . . . 5Dashboard/Cockpit Automation . . . . . . . . . . . . .

Polany, Rany

2012-01-01T23:59:59.000Z

172

Medical and Home automation Sensor Networks for Senior Citizens Telehomecare  

E-Print Network [OSTI]

Medical and Home automation Sensor Networks for Senior Citizens Telehomecare Shahram Nourizadeh1, 2 Healthcare, Smart Home, Distributed health record, Actimetry, Fuzzy logic, Home automation I. INTRODUCTION.Deroussent}@medetic.com Abstract- This paper presents a home Tele-healthcare system for the senior citizens. The system uses home

Paris-Sud XI, Université de

173

CIMplementation™: Evaluating Manufacturing Automation  

E-Print Network [OSTI]

in the manufacturing organization if CIMplementation~* is to succeed. 1.0 INTRODUCTION There is much discussion today about Com puter Integrated Manufacturing (CIM). Automation tools like Computer Aided Design (CAD) systems, robots, automated material handling...~ Pressing the frontier of technology in one's own manufactur ing facility will not be without its pitfalls. Second, while automation engineers may be able to piece together the technological pieces of a CIM system, they cannot and do not evaluate...

Krakauer, J.

174

A framework for warranty management in industrial assets  

Science Journals Connector (OSTI)

The objective of this paper is to suggest a management framework for a better organization of warranty assistance, using engineering techniques already developed for similar processes and according to a process-based quality management system. Therefore, ... Keywords: After sales, Industrial assets, Reference framework, Warranty management

V. GonzáLez-Prida; A. Crespo MáRquez

2012-12-01T23:59:59.000Z

175

GREAT LAKES ICE COVER RaymondA. Asset'  

E-Print Network [OSTI]

hydropower production and cooling water intakes, and damaging shore structures. Ice cover also impactsChapter 6 GREAT LAKES ICE COVER RaymondA. Asset' ABSTRACT: Theformation of ice on the Lallrentian (~rthe Great Lakes anel local weather and climate. The (I1Inllal seasonal and ~'Patialprogression of ice

176

PATH PLANNING & MEASUREMENT REGISTRATION FOR ROBOTIC STRUCTURAL ASSET MONITORING  

E-Print Network [OSTI]

that require such a planning strategy include vacuum cleaning robots, painting robots, underwater imagingPATH PLANNING & MEASUREMENT REGISTRATION FOR ROBOTIC STRUCTURAL ASSET MONITORING S.G. Pierce, C s.g.pierce@strath.ac.uk ABSTRACT In recent years, robotic devices have been explored across a wide

Boyer, Edmond

177

Retirement planning in individual asset–liability management  

Science Journals Connector (OSTI)

......inflation on individual consumption and living standards...achieve a sufficient consumption stream after retirement...interest rate (moving average) 10 year Euro interest...J. M. (1998) The home account advisor: asset...Methods in Finance and Energy. Fred Hillier International......

Giorgio Consigli; Gaetano Iaquinta; Vittorio Moriggia; Massimo di Tria; Davide Musitelli

2012-10-01T23:59:59.000Z

178

Who Gets Diabetes? Good health is your most valuable asset  

E-Print Network [OSTI]

Who Gets Diabetes? Good health is your most valuable asset ­ make the most of it. Millions, blindness and many other health problems if it is not controlled. By managing this condition with the right care, treatment and lifestyle changes, a patient diagnosed with diabetes can continue to live a happy

179

Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT | Department of  

Broader source: Energy.gov (indexed) [DOE]

30.1B, REAL PROPERTY ASSET MANAGEMENT 30.1B, REAL PROPERTY ASSET MANAGEMENT Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT "The objective of DOE O 430.1B, Real Property Asset Management, is to establish a corporate, holistic, and performance-based approach to real property life-cycle asset management that links real property asset planning, programming, budgeting, and evaluation to program mission projections and performance outcomes. To accomplish the objective, this Order identifies requirements and establishes reporting mechanisms and responsibilities for real property asset management. This Order implements DOE P 580.1, Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property, dated 5/20/02. DOE Order Self Study Modules - DOE O 430.1B Real Property Asset Management

180

Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT  

Broader source: Energy.gov [DOE]

"The objective of DOE O 430.1B, Real Property Asset Management, is to establish a corporate, holistic, and performance-based approach to real property life-cycle asset management that links real...

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

An Asset Management Framework Based on Field Performance of Pavement Markings  

E-Print Network [OSTI]

Performance-based asset management provides a strategic framework for managing transportation infrastructure to improve existing procedures for resource allocation. The importance of comprehensive management of pavement marking assets not only...

Madiri, Sam

2011-08-08T23:59:59.000Z

182

IPv6 Home Automation.  

E-Print Network [OSTI]

?? Home automation is the systematic controlling and monitoring of everyday home devices such as lighting, heating, window blinds and appliances (both white goods and… (more)

Hådén, Thor

2009-01-01T23:59:59.000Z

183

Home Automation Using Elvin.  

E-Print Network [OSTI]

?? Home automation systems of today tend to be external solutions to an existing product that enable rather complex and expensive communications equipment to be… (more)

Malm, Anders

2005-01-01T23:59:59.000Z

184

Vehicle highway automation.  

E-Print Network [OSTI]

??Vehicle Highway Automation has been studied for several years but a practical system has not been possible because of technology limitations. New advances in sensing… (more)

Challa, Dinesh Kumar

2009-01-01T23:59:59.000Z

185

DOE Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle-- Final Report  

Broader source: Energy.gov [DOE]

Collection, assessment, and analysis of Seattle stakeholder input and opinions regarding the commercial building energy asset rating program.

186

Laboratory automation-A case history  

Science Journals Connector (OSTI)

Laboratory automation-A case history ... This article describes an automated Raman spectrometer. ...

Bernard J. Bulkin; Edward H. Cole; Arthur Noguerola

1974-01-01T23:59:59.000Z

187

Vehicle to Micro-Grid: Leveraging Existing Assets for Reliable Energy Management (Poster), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Micro-Grid: Leveraging Existing Assets for Reliable Energy Management to Micro-Grid: Leveraging Existing Assets for Reliable Energy Management Mike Simpson, Tony Markel, and Michael O'Keefe National Renewable Energy Laboratory INTRODUCTION OPPORTUNITY National Renewable Energy Laboratory Presented at the 4th International Conference on Integration of Renewable & Distributed Energy Resources, December 6-10 , 2010 * Albuquerque, New Mexico U.S. military bases, such as Fort Carson, are interested in opportunities to lower energy consumption and use renewable resources. l Electricity GCV Micro-Grid The Smith Electric Newton all-electric truck Fort Carson Photovoltaic Installation NREL PIX 17631 NREL PIX # 17394 Natural Gas Renewable Energy Truck Fleet Diesel Generators

188

Automated Demand Response and Commissioning  

E-Print Network [OSTI]

Fully-Automated Demand Response Test in Large Facilities14in DR systems. Demand Response using HVAC in Commercialof Fully Automated Demand Response in Large Facilities”

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

189

Autonomic Product Development Process Automation.  

E-Print Network [OSTI]

??Market globalization and mass customization requirements are forcing companies towards automation of their product development processes. Many task-specific software solutions provide localized automation. Coordinating these… (more)

Daley, John E.

2007-01-01T23:59:59.000Z

190

Design, Simulation, and Analysis of Substation Automation Networks  

E-Print Network [OSTI]

on the Substation Automation Systems (SAS). Substations are nodes in the smart grid infrastructure that help the in transportation of power by connecting the transmission and distribution lines. The SAS applications are con figured to operate with minimal human...

Kembanur Natarajan, Elangovan

2012-07-16T23:59:59.000Z

191

Human-automation collaborative RRT for UAV mission path planning  

E-Print Network [OSTI]

Future envisioned Unmanned Aerial Vehicle (UAV) missions will be carried out in dynamic and complex environments. Human-automation collaboration will be required in order to distribute the increased mission workload that ...

Caves, Américo De Jesús (Caves Corral)

2010-01-01T23:59:59.000Z

192

Automation Creates New Managers  

Science Journals Connector (OSTI)

AUTOMATION will bring about new and broader patterns in the use of labor and creation of a large group of managers of a new type, says E. W. Engstrom, senior executive vice president of the Radio Corporation of America. With automation, there will no ...

1955-12-12T23:59:59.000Z

193

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

194

Distribution:  

Office of Legacy Management (LM)

JAN26 19% JAN26 19% Distribution: OR00 Attn: h.H.M.Roth DFMusser ITMM MMMann INS JCRyan FIw(2) Hsixele SRGustavson, Document rocm Formal file i+a@mmm bav@ ~@esiaw*cp Suppl. file 'Br & Div rf's s/health (lic.only) UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAB MATERIAL LICENSE pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, P&t 70, "Special Nuclear Material Reg)llatiqm," a license is hereby issued a$hortztng the licensee to rekeive and possess the special nuclear material designated below; to use such special nuclear mat&ial for the purpose(s) and at the place(s) designated below; and to transfer such material to per&s authorized to receive it in accordance with the regula,tions in said Part.

195

U.S. Department of Energy Launches New Website for Asset Revitalization  

Broader source: Energy.gov (indexed) [DOE]

Launches New Website for Asset Launches New Website for Asset Revitalization Initiative (ARI) U.S. Department of Energy Launches New Website for Asset Revitalization Initiative (ARI) July 3, 2013 - 12:00pm Addthis Screenshot of Asset Revitalization Initiative (ARI) website. Screenshot of Asset Revitalization Initiative (ARI) website. WASHINGTON, D.C. - Today, the U.S.Department of Energy (DOE) launched a website for the Asset Revitalization Initiative (ARI), a DOE-wide effort to advance the beneficial reuse of its unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources and a highly skilled workforce. ARI promotes a more efficient business environment to encourage collaboration between public and private resources. ARI efforts will

196

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide the Department of Energy (DOE), including the National Nuclear Security Administration, with project management direction for the acquisition of capital assets with the goal of delivering projects on schedule, within budget, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health standards. Cancels DOE O 413.3. Canceled by DOE O 413.3A Chg 1.

2011-05-18T23:59:59.000Z

197

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. The page change incorporates requirements of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 413.3. Canceled by DOE O 413.3B dated 11-29-10.

2006-07-28T23:59:59.000Z

198

On-Orbit Asset Management System, September 1995. Final report  

SciTech Connect (OSTI)

Declining budgets have prompted the need to decrease launch cost, increase satellite lifetime, and accomplish more with each satellite. This study evaluates an OOAMS system for its ability to lengthen lifetime of on-orbit assets, decrease the number of satellites required to perform a mission, increase responsiveness, and provide increased mission capability/tactical advantage. Lifetime analysis suggest that the larger satellite systems (NASA and military communication systems, surveillance satellites and earth observing satellites) would benefit most from a nuclear bimodal OOAMS. Evaluation of satellite constellations indicate that a modest reduction in the number of satellites could be realized using OOAMS if the thermal restart capability was at least ten. An OOAMS could improve the responsiveness (launching of new assets) using on-orbit reconstitution of assets. A top level utility assessment was done to address system cost issues relating to funding profiles, first unit cost, and break-even analysis. From mission capture and orbital lifetime criteria, the recommended minimum orbital altitude is 900 km. The on-orbit thermal restart capability should be increased from five to ten. Analysis of total impulse vs propellant consumed for selected missions suggests that total impulse be increased from 40 million to 48 million Newton-seconds.

NONE

1995-10-10T23:59:59.000Z

199

Cognitive Engineering Automation and Human  

E-Print Network [OSTI]

· Home automation · Robotics · Unmanned vehicles (UAVs and UGVs) · Drug design/Molecular geneticsCognitive Engineering PSYC 530 Automation and Human Performance Raja Parasuraman #12;Overview Automation-Related Accidents Levels and Stages of Automation Information Acquisition and Analysis Decision

Parasuraman, Raja

200

Automation of Feynman Diagram Evaluation  

E-Print Network [OSTI]

A C-program DIANA (DIagram ANAlyser) for the automation of Feynman diagram evaluations is presented.

M. Tentyukov; J. Fleischer

1998-02-04T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Shielded cells transfer automation  

SciTech Connect (OSTI)

Nuclear waste from shielded cells is removed, packaged, and transferred manually in many nuclear facilities. Radiation exposure is absorbed by operators during these operations and limited only through procedural controls. Technological advances in automation using robotics have allowed a production waste removal operation to be automated to reduce radiation exposure. The robotic system bags waste containers out of glove box and transfers them to a shielded container. Operators control the system outside the system work area via television cameras. 9 figures.

Fisher, J J

1984-01-01T23:59:59.000Z

202

Automated Lattice Perturbation Theory  

SciTech Connect (OSTI)

I review recent developments in automated lattice perturbation theory. Starting with an overview of lattice perturbation theory, I focus on the three automation packages currently "on the market": HiPPy/HPsrc, Pastor and PhySyCAl. I highlight some recent applications of these methods, particularly in B physics. In the final section I briefly discuss the related, but distinct, approach of numerical stochastic perturbation theory.

Monahan, Christopher

2014-11-01T23:59:59.000Z

203

Home Network Technologies and Automating Demand Response  

E-Print Network [OSTI]

potential role of home automation networks in implementinghow existing and future home automation systems may providehome networks" and "home automation" are frequently used

McParland, Charles

2010-01-01T23:59:59.000Z

204

Development of Building Automation and Control Systems  

E-Print Network [OSTI]

A design flow for building automation and control systems,’’Development of Building Automation and Control Systems Yangdesign of the build- ing automation system (including the

Yang, Yang; Zhu, Qi; Maasoumy, Mehdi; Sangiovanni-Vincentelli, Alberto

2012-01-01T23:59:59.000Z

205

USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?  

SciTech Connect (OSTI)

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest.

Magoulas, V.

2013-06-03T23:59:59.000Z

206

E-Print Network 3.0 - assets investment timing Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

assets investment timing Page: << < 1 2 3 4 5 > >> 1 San Francisco State University Foundation Restricted Investment Policy No. 302 Summary: Municipal bonds Investment grade...

207

SciTech Connect: Development of Asset Fault Signatures for Prognostic...  

Office of Scientific and Technical Information (OSTI)

signatures to assess the health status of generator step-up generators and emergency diesel generators in nuclear power plants. Asset fault signatures describe the distinctive...

208

E-Print Network 3.0 - assets student talent Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: assets student talent Page: << < 1 2 3 4 5 > >> 1 SPOTLIGHT on: Molly Simon Industrial and Systems Engineering Summary: , CA Involvement at USC: SWE Student Affairs...

209

OFFICE of MATERIALS & LOGISTICS MANAGEMENT CAPITAL ASSET INVENTORY CERTIFICATE --IC-10  

E-Print Network [OSTI]

OFFICE of MATERIALS & LOGISTICS MANAGEMENT CAPITAL ASSET INVENTORY CERTIFICATE -- IC-10 DATE: From: Jack Ferraro University Director Office of Materials & Logistics Management (MLM) LB058, MC 2012

Oliver, Douglas L.

210

E-Print Network 3.0 - assignment algorithm asset-based Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

development as well as Gandhian and Buddhist practice, students... HEALTH INEQUITIES IN NEPAL THROUGH ASSET BASED COMMUNITY DEVELOPMENT Program Summary: In this ... Source: Bent,...

211

Automated Fault Location In Smart Distribution Systems  

E-Print Network [OSTI]

measured at the power substation during a single phase to ground fault clearance [17] .............................................. 111 Figure 26 Analyzed signal using wavelet transform from phase B current during a fault [17..., but are not limited to, substation and feeder relay, intelligent controllers for capacitor bank switches or reclosers, Automatic Meter Reading (AMR) systems installed at the customer sites, power quality meters installed at strategic locations in the system, low...

Lotfifard, Saeed

2012-10-19T23:59:59.000Z

212

Honeywell Demonstrates Automated Demand Response Benefits for...  

Broader source: Energy.gov (indexed) [DOE]

Honeywell Demonstrates Automated Demand Response Benefits for Utility, Commercial, and Industrial Customers Honeywell Demonstrates Automated Demand Response Benefits for Utility,...

213

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS  

E-Print Network [OSTI]

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS: 2006 PROGRAM DESCRIPTION AND RESULTS APPENDICES.................................................................................... 5 B.2. DR Automation Server User Guide

214

Development of Building Automation and Control Systems  

E-Print Network [OSTI]

Johnson Controls, 70 in Automated Logic EIKON language, 42systems developed by Automated Logic. Similarly as shown in

Yang, Yang; Zhu, Qi; Maasoumy, Mehdi; Sangiovanni-Vincentelli, Alberto

2012-01-01T23:59:59.000Z

215

Definition: Automated Voltage Regulators | Open Energy Information  

Open Energy Info (EERE)

Regulators Regulators Jump to: navigation, search Dictionary.png Automated Voltage Regulators Voltage regulators are transformers that can increase or decrease the voltage on a distribution circuit to help keep the voltage within a pre-determined band. Unlike capacitor banks, voltage regulators cannot adjust power factor. These devices typically monitor the voltage at the location where they are connected, and compare it to a programmed set point. If the voltage deviates too far from the set point, the voltage regulator can increase or decrease its output voltage by moving the tap on the secondary side up or down. An automated voltage regulator can operate with remote control signals, or in concert with other area voltage control devices, to help regulate distribution voltage in a coordinated fashion.

216

Commercial Building Energy Asset Score Data Collection Priority Map  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Score Data Collection Priority Map Commercial Building Energy Asset Score Data Collection Priority Map Type Page OFFICE* 1-2 RETAIL 3 SCHOOL 4 WAREHOUSE 5 LODGING* 6 MULTI-FAMILY* 7 ASSEMBLY 8 APPENDIX: ASHRAE CLIMATE ZONE MAP 9 * For the purposes of this guide, some use types have multiple tables based on building size. If you're uncertain which size applies to your building, use your best judgment or consult more than one table. The size categories are meant as general guidelines but do not correspond to specific ranges in square footage. OFFICE Large Office Priorities by Climate Zones 1A 1B 2A 2B 3A 3B 3C 4A 4B 4C 5A 5B 5C 6A 6B 7 8 Lighting High High High High High High High High High High High High High High High High High Lighting Controls High High High High High High High High High High High High High High High High High

217

DOE_Fixed_Asset_Module_Balance_150709 Analysis 20090731.xls  

Broader source: Energy.gov (indexed) [DOE]

Asset Type Asset Type Allottee Desc Rpting Ent Desc Data 401 410 430 440 CC - Consolidated Business Center CC CC Consolidated Business Center Sum of Cost Sum of deptn_amt Sum of Accum. Depr. Sum of Net Book Value CC Grand Junction Project Office Sum of Cost Sum of deptn_amt Sum of Accum. Depr. Sum of Net Book Value CC LO Paducah Project Office Sum of Cost $235,263 Sum of deptn_amt $0 Sum of Accum. Depr. $0 Sum of Net Book Value $235,263 CC LO Portsmouth Project Office Sum of Cost $710,333 Sum of deptn_amt $0 Sum of Accum. Depr. $0 Sum of Net Book Value $710,333 CC OH West Valley Project Office Sum of Cost Sum of deptn_amt Sum of Accum. Depr. Sum of Net Book Value CC Small Sites Program Direction Sum of Cost Sum of deptn_amt Sum of Accum. Depr. Sum of Net Book Value OH Ohio Sum of Cost $551,991 $482,865

218

HIGHLY AUTOMATED MACROMOLECULAR  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AUTOMATED MACROMOLECULAR AUTOMATED MACROMOLECULAR CRYSTALLOGRAPHY BEAMLINE (AMX) Group Leader: Dieter Schneider Proposal Team: M. Allaire 1 , L. Berman 1 , M. Chance 2 , W. Hendrickson 3 , A. Héroux 1 , J. Jakoncic 1 , A. Orville 1 , H. Robinson 1 , D. Schneider 1 , W. Shi 2 , A. Soares 1 , V. Stojanoff 1 , R. Sweet 1 1 Brookhaven National Laboratory, 2 Case Western Reserve University, 3 Columbia University MISSION APPLICATIONS AND CAPABILITIES ADDITIONAL INFORMATION * AMX at NSLS-II will provide structural biologists with ready access to an advanced macromolecular crystallography (MX) beamline for the elucidation of structure and function of macromolecular complexes. * Its high flux, tunable energy, and natively small focal spot will make it a crystallographer's preferred beamline. * Its high degree of automation will provide a high throughput

219

Automation Status | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. mfg2011plenarysperrick.pdf More...

220

Automation on the laboratory bench  

Science Journals Connector (OSTI)

Automation on the laboratory bench ... In designing an automation kit the authors attempted to give chemistry a system which is versatile and easy to apply in taking over the boring and difficult task of controlling parameters manually. ...

M. Legrand; A. Foucard

1978-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Automation: Congress' Next Probe  

Science Journals Connector (OSTI)

THE stage is being set for a Congressional investigation of the trend toward automation in industry. From all indications, this could become one of the hottest subjects in labor-management relations during the coming year.Formal hearings have been ...

1955-08-29T23:59:59.000Z

222

Automation of Capacity Bidding with an Aggregator Using Open Automated Demand Response  

E-Print Network [OSTI]

Protocol for Building Automation and Control  Networks.  Protocol for Building Automation and Control  Networks, Demand Response Automation Server  Demand Response Research 

Kiliccote, Sila

2011-01-01T23:59:59.000Z

223

DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec  

Broader source: Energy.gov (indexed) [DOE]

NSTB Researchers Demonstrate R&D Successes to Asset Owners at NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference More than 150 energy sector leaders-including nearly 100 asset owners and operators-gathered at the 2009 EnergySec Annual Summit in Seattle, WA, on Sept. 23-24, where researchers from the Department of Energy's National SCADA Test Bed (NSTB) Program gave a four-hour demonstration and presentation of their Roadmap-related control systems security work. DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan Security is Not an Option DOE National SCADA Test Bed Program Multi-Year Plan

224

Nashville Turns an Eyesore into an Energy-Efficient Asset | Department of  

Broader source: Energy.gov (indexed) [DOE]

Nashville Turns an Eyesore into an Energy-Efficient Asset Nashville Turns an Eyesore into an Energy-Efficient Asset Nashville Turns an Eyesore into an Energy-Efficient Asset September 19, 2012 - 10:43am Addthis The completed Nashville Bridge Company's building (called NABRICO for short) includes a geothermal heat pump system to keep public energy costs low. | Photo courtesy of David Powell, AIA. The completed Nashville Bridge Company's building (called NABRICO for short) includes a geothermal heat pump system to keep public energy costs low. | Photo courtesy of David Powell, AIA. Built in 1908, the NABRICO building was once a vital asset to Nashville's local economy. | Photo courtesy of Barry Griffith. Built in 1908, the NABRICO building was once a vital asset to Nashville's local economy. | Photo courtesy of Barry Griffith.

225

Assets in Action "A Night in Italy" fundraiser on October 20  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assets in Action "A Night in Italy" Fundraiser Assets in Action "A Night in Italy" Fundraiser Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Assets in Action "A Night in Italy" fundraiser on October 20 Building "Healthy Communities, Healthy Youth" is the goal of Los Alamos' Assets in Action program. October 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Building "Healthy Communities, Healthy Youth" is the goal of Los Alamos' Assets in Action program. You can further its efforts by attending the fundraiser "A Night in Italy" scheduled for Saturday, October 20. The event will be held in Los Alamos at the Hilltop House Hotel

226

DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec  

Broader source: Energy.gov (indexed) [DOE]

DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference October 1, 2009 - 1:26pm Addthis More than 150 energy sector leaders-including nearly 100 asset owners and operators-gathered at the 2009 EnergySec Annual Summit in Seattle, WA, on Sept. 23-24, where researchers from the Department of Energy's National SCADA Test Bed (NSTB) Program gave a four-hour demonstration and presentation of their Roadmap-related control systems security work. EnergySec is an information sharing forum with more than 230 utility members representing 75 energy companies across the nation. Its fifth annual conference drew asset owners, vendors, and government

227

Accounting methods for recognition of fixed asset underdepreciation  

E-Print Network [OSTI]

dofree of infiatimx six''. a return to cne !iundrcd au&' fort?- xer cen of' the Xu"~'~ crise level is eximrii need thxi sill bc x~proxiuately the level idZch exd. sted at, ~. %crx 1 hf ox' ugiMLBxyg I:dJ? i ~ 2lic is doiMQstratod tn i;. ire Xx v... of dollars oriI", inally investod lvould have bllII;ht at that, tioe, In other llordsx ho wants to recover the pure'I~in'I poxxer of thC Q~, inal xxlvBsb36nts For oxag~lox on ascot llhieh mv?, . bo referred to as asset . I ~ costiu. ton thw. . . . zId...

Hidell, Richard Robinson

2012-06-07T23:59:59.000Z

228

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

2000-10-13T23:59:59.000Z

229

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

2000-10-13T23:59:59.000Z

230

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Cancels DOE O 413.3A, Chg 1 dated 6-28-06.

2010-11-29T23:59:59.000Z

231

DOE Railcar Fleet Asset Planning & Lessons Learned  

Broader source: Energy.gov (indexed) [DOE]

Railcar Railcar Fleet DOE Railcar Fleet Asset Planning & Lessons Learned Dave Lojek - US DOE Lessons Learned Dave Lojek US DOE Environmental Management Consolidated Business Center (EMCBC) Support: Office of Packaging & Transportation (EM-45) Di i O i Discussion Overview *Completed Rail Campaigns - LLW -Fernald, Mound, Savannah River *In Progress - LLW -Savannah River, Brookhaven, Moab *ForeCast - LLW -Portsmouth, Paducah, D&D, DUF6 2 *Lessons Learned F ld Cl P j t Fernald Closure Project First Rail Shipment: April 26, 1999 First Rail Shipment: Final Rail Shipment: April 26, 1999 October 11, 2006 Unit Trains Shipped: 201 Railcars Shipped: 12,000 3 Tons Shipped: 1,200,000 F ld R il E i t Fernald Rail Equipment * 3 - Locomotives * 250 Total Railcars In Service 190 New Purchase Gov't Gondolas 60 Leased Gondola Railcars

232

Definition: Automated Feeder And Line Switching | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Automated Feeder And Line Switching Jump to: navigation, search Dictionary.png Automated Feeder And Line Switching Automated feeder and line switching is realized through automatic isolation and reconfiguration of faulted segments of distribution feeders or transmission lines via sensors, controls, switches, and communications systems. These devices can operate autonomously in response to local events or in response to signals from a central control system.[1] Related Terms transmission lines, transmission line References ↑ SmartGrid.gov 'Description of Functions' An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Automated_Feeder_And_Line_Switching&oldid=480562"

233

Toward A Practical Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

Toward A Practical Multi-agent System for Integrated Control and Asset Management of Petroleum intelligent multi- agent system for asset management for the petroleum industry, which is crucial the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture

Taylor, James H.

234

Prototype Design of A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities  

E-Print Network [OSTI]

Prototype Design of A Multi-agent System for Integrated Control and Asset Management of Petroleum intelligent multi- agent system for asset management for the petroleum industry, which is crucial the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture

Taylor, James H.

235

Automated gas chromatography  

DOE Patents [OSTI]

An apparatus and process for the continuous, near real-time monitoring of low-level concentrations of organic compounds in a liquid, and, more particularly, a water stream. A small liquid volume of flow from a liquid process stream containing organic compounds is diverted by an automated process to a heated vaporization capillary where the liquid volume is vaporized to a gas that flows to an automated gas chromatograph separation column to chromatographically separate the organic compounds. Organic compounds are detected and the information transmitted to a control system for use in process control. Concentrations of organic compounds less than one part per million are detected in less than one minute. 7 figs.

Mowry, C.D.; Blair, D.S.; Rodacy, P.J.; Reber, S.D.

1999-07-13T23:59:59.000Z

236

Automated Job Hazards Analysis  

Broader source: Energy.gov [DOE]

AJHA Program - The Automated Job Hazard Analysis (AJHA) computer program is part of an enhanced work planning process employed at the Department of Energy's Hanford worksite. The AJHA system is routinely used to performed evaluations for medium and high risk work, and in the development of corrective maintenance work packages at the site. The tool is designed to ensure that workers are fully involved in identifying the hazards, requirements, and controls associated with tasks.

237

TJ Automation | Open Energy Information  

Open Energy Info (EERE)

TJ Automation TJ Automation Jump to: navigation, search Name TJ Automation Facility TJ Automation Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner TJ Automation Energy Purchaser TJ Automation Location Archbold OH Coordinates 41.45823855°, -84.30666804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.45823855,"lon":-84.30666804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

238

Report blasts Patent Office automation  

Science Journals Connector (OSTI)

Report blasts Patent Office automation ... The Department of Commerce is moving quickly to implement a report highly critical of the Patent & Trademark Office's efforts to fully automate its patent search and retrieval operations. ... An Industry Review Panel found that the current automated patent system is over-designed and as a result needs a redundant communications network and redundant storage of all patent images at high resolution. ...

JANICE LONG

1988-05-30T23:59:59.000Z

239

Virtual Machine in Automation Projects.  

E-Print Network [OSTI]

?? Virtual machine, as an engineering tool, has recently been introduced into automation projects in Tetra Pak Processing System AB. The goal of this paper… (more)

Xing, Xiaoyuan

2010-01-01T23:59:59.000Z

240

AUTOMATED ~.JELDING -RESEARCH NEEDS T. H. Eagar  

E-Print Network [OSTI]

) ) ..... . '. AUTOMATED ~.JELDING - RESEARCH NEEDS T. H. Eagar Department of Naterials Science and Engineering Nassachusetts Institute of Technology Cambridge, Hassachusetts 02139 Increased use of automated is necessary in order to develop reliable automated welding techniques. #12;Introduction During the past decade

Eagar, Thomas W.

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Automation improves personal effectiveness while reducing drudgery  

Science Journals Connector (OSTI)

Automation improves personal effectiveness while reducing drudgery ... "The term automation ," says one Department of Labor official with undisguised feeling, "is a hopeless semantic jungle." ... One industry man defines automation very loosely as any way of doing things better with machines. ...

1966-03-14T23:59:59.000Z

242

You Cannot Manage What You Cannot Measure: An Information Systems Based Asset Management Perspective  

Science Journals Connector (OSTI)

Measuring the impact of implementation of information systems for asset management is a complex issue; due to the stochastic nature of process variables, substantial effects of information systems on the way u...

Abrar Haider; Andy Koronios; Gerald Quirchmayr

2006-01-01T23:59:59.000Z

243

DOE Order Self Study Modules - DOE O 430.1B Real Property Asset Management  

Broader source: Energy.gov (indexed) [DOE]

0.1B 0.1B REAL PROPERTY ASSET MANAGEMENT NATIONAL NUCLEAR SECURITY ADMINISTRATION SERVICE CENTER Change No: 1 DOE: O 430.1B Level: Familiar Date: 12/1/04 1 DOE O 430.1B REAL PROPERTY ASSET MANAGEMENT FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. State when a site is required to have and maintain a ten-year site plan (TYSP). What is needed when a TYSP is not required? 2. Discuss contractor requirements for real property asset planning. 3. Discuss the vehicles used to establish land-use planning and management. 4. Define the term "value engineering." 5. Discuss how repair costs associated with real property asset deficiencies are

244

U.S. Department of Energy Launches New Website for Asset Revitalizatio...  

Broader source: Energy.gov (indexed) [DOE]

Revitalization Initiative (ARI) website. WASHINGTON, D.C. - Today, the U.S.Department of Energy (DOE) launched a website for the Asset Revitalization Initiative (ARI), a DOE-wide...

245

Northwest Open Automated Demand Response Technology Demonstration Project  

E-Print Network [OSTI]

Facility Technician) Automated Logic Corporation: Ivanembedded in the Target’s Automated Logic Corporation (ALC)

Kiliccote, Sila

2010-01-01T23:59:59.000Z

246

Automated fiber pigtailing machine  

DOE Patents [OSTI]

The Automated Fiber Pigtailing Machine (AFPM) aligns and attaches optical fibers to optoelectronic (OE) devices such as laser diodes, photodiodes, and waveguide devices without operator intervention. The so-called pigtailing process is completed with sub-micron accuracies in less than 3 minutes. The AFPM operates unattended for one hour, is modular in design and is compatible with a mass production manufacturing environment. This machine can be used to build components which are used in military aircraft navigation systems, computer systems, communications systems and in the construction of diagnostics and experimental systems. 26 figs.

Strand, O.T.; Lowry, M.E.

1999-01-05T23:59:59.000Z

247

Chapter 11 - Industrial Automation  

Science Journals Connector (OSTI)

The industrial systems of the future are complex systems composed of vast numbers of devices interacting with each other and with enterprise systems. Modern technologies such as web services, service-oriented architectures (SOAs), the cloud, etc. make it possible for sophisticated infrastructures to emerge in future factories. We take a closer look at key visionary aspects that are expected to be introduced in the industrial automation domain in the years to come, and the pivotal role of M2M and IoT. Additionally, we investigate the impact on the collaboration of machines among themselves and with enterprise systems and their services.

Jan Höller; Vlasios Tsiatsis; Catherine Mulligan; Stamatis Karnouskos; Stefan Avesand; David Boyle

2014-01-01T23:59:59.000Z

248

Automating dipole subtraction  

E-Print Network [OSTI]

We report on automating the Catani-Seymour dipole subtraction which is a general procedure to treat infrared divergences in real emission processes at next-to-leading order in QCD. The automatization rests on three essential steps: the creation of the dipole terms, the calculation of the color linked squared Born matrix elements, and the evaluation of different helicity amplitudes. The routines have been tested for a number of complex processes, such as the real emission process gg --> t anti-t ggg.

K. Hasegawa; S. Moch; P. Uwer

2008-07-23T23:59:59.000Z

249

Energy Automation Systems Inc | Open Energy Information  

Open Energy Info (EERE)

Energy Automation Systems Inc Energy Automation Systems Inc Jump to: navigation, search Name Energy Automation Systems Inc. Place Hendersonville, Tennessee Zip 37075 Sector Buildings, Efficiency Product An energy efficiency consultancy firm focusing on analysis of energy consumption in buildings and providing improvments in the efficiency of the distribution system and equipment loads, similar to an ESCO. Coordinates 36.304861°, -86.620214° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.304861,"lon":-86.620214,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

250

Installation and Commissioning Automated Demand Response Systems  

E-Print Network [OSTI]

their partnership in demand response automation research andand Techniques for Demand Response. LBNL Report 59975. Mayof Fully Automated Demand Response in Large Facilities.

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

251

Home Network Technologies and Automating Demand Response  

E-Print Network [OSTI]

and Automating Demand Response Charles McParland, Lawrenceand Automating Demand Response Charles McParland, LBNLCommercial and Residential Demand Response Overview of the

McParland, Charles

2010-01-01T23:59:59.000Z

252

Automation in X-Ray Crystallography  

Science Journals Connector (OSTI)

Automation in X-Ray Crystallography ... But in the past few years, automation procedures have been applied to intrinsically superior experimental methods. ...

S.C. ABRAHAMS

1963-06-03T23:59:59.000Z

253

Understanding roi metrics for software test automation.  

E-Print Network [OSTI]

??Software test automation is widely accepted as an efficient software testing technique. However, automation has failed to deliver the expected productivity more often than not.… (more)

Jayachandran, Naveen

2005-01-01T23:59:59.000Z

254

Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

2000-06-10T23:59:59.000Z

255

Transportable automated ammonia sensor based on a pulsed thermoelectrically cooled  

E-Print Network [OSTI]

Transportable automated ammonia sensor based on a pulsed thermoelectrically cooled quantum single-frequency, thermoelectrically cooled, pulsed quantum-cascade laser with an embedded distributed absorption spectroscopy with a pulsed QC DFB laser was reported in Ref. 3, where wavelength modulation

256

Vehicle to Micro-Grid: Leveraging Existing Assets for Reliable...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Renewable & Distributed Energy Resources, December 6-10 , 2010 * Albuquerque, New Mexico U.S. military bases, such as Fort Carson, are interested in opportunities to lower...

257

Home Network Technologies and Automating Demand Response  

SciTech Connect (OSTI)

Over the past several years, interest in large-scale control of peak energy demand and total consumption has increased. While motivated by a number of factors, this interest has primarily been spurred on the demand side by the increasing cost of energy and, on the supply side by the limited ability of utilities to build sufficient electricity generation capacity to meet unrestrained future demand. To address peak electricity use Demand Response (DR) systems are being proposed to motivate reductions in electricity use through the use of price incentives. DR systems are also be design to shift or curtail energy demand at critical times when the generation, transmission, and distribution systems (i.e. the 'grid') are threatened with instabilities. To be effectively deployed on a large-scale, these proposed DR systems need to be automated. Automation will require robust and efficient data communications infrastructures across geographically dispersed markets. The present availability of widespread Internet connectivity and inexpensive, reliable computing hardware combined with the growing confidence in the capabilities of distributed, application-level communications protocols suggests that now is the time for designing and deploying practical systems. Centralized computer systems that are capable of providing continuous signals to automate customers reduction of power demand, are known as Demand Response Automation Servers (DRAS). The deployment of prototype DRAS systems has already begun - with most initial deployments targeting large commercial and industrial (C & I) customers. An examination of the current overall energy consumption by economic sector shows that the C & I market is responsible for roughly half of all energy consumption in the US. On a per customer basis, large C & I customers clearly have the most to offer - and to gain - by participating in DR programs to reduce peak demand. And, by concentrating on a small number of relatively sophisticated energy consumers, it has been possible to improve the DR 'state of the art' with a manageable commitment of technical resources on both the utility and consumer side. Although numerous C & I DR applications of a DRAS infrastructure are still in either prototype or early production phases, these early attempts at automating DR have been notably successful for both utilities and C & I customers. Several factors have strongly contributed to this success and will be discussed below. These successes have motivated utilities and regulators to look closely at how DR programs can be expanded to encompass the remaining (roughly) half of the state's energy load - the light commercial and, in numerical terms, the more important residential customer market. This survey examines technical issues facing the implementation of automated DR in the residential environment. In particular, we will look at the potential role of home automation networks in implementing wide-scale DR systems that communicate directly to individual residences.

McParland, Charles

2009-12-01T23:59:59.000Z

258

Honeywell modular automation system acceptance test report  

SciTech Connect (OSTI)

This document provides the results of the Acceptance Test Procedure for the Honeywell Modular Automation System.

Cunningham, L.T., Westinghouse Hanford

1996-06-14T23:59:59.000Z

259

Automating the Selection of Fenestration Systems to Best Meet Daylighting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Automating the Selection of Fenestration Systems to Best Meet Daylighting Automating the Selection of Fenestration Systems to Best Meet Daylighting Performance Goals Title Automating the Selection of Fenestration Systems to Best Meet Daylighting Performance Goals Publication Type Conference Paper LBNL Report Number LBNL-53003 Year of Publication 2003 Authors Fernandes, Luis L., and Konstantinos M. Papamichael Conference Name 2003 International Building Performance Simulation Association Conference Date Published 02/2003 Conference Location Eindhoven, Netherlands Call Number LBNL-53003 Abstract Traditional selection of fenestration systems follows a trial-and-error approach, i.e., iterative selection of fenestration systems and evaluation of their performance through the use of simulation tools and techniques. This paper is about the development of a new method, which inverts traditional practice, i.e., aims at automated selection of fenestration systems that best meet specific lighting performance goals. The new method is based on manipulation of matrices that represent the optical properties of fenestration systems, the propagation of light in interior spaces, and the outdoors luminous conditions. The method follows two steps: 1) the determination of the luminous flux distribution originating from the location of the fenestration that best meets the desired lighting performance goals and 2) the selection of the fenestration system that comes closer to producing the desired flux distribution from the outdoor daylight distribution.

260

Distributed Intelligent Agents for Decision Making at Local Distributed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Distributed Intelligent Agents for Decision Making at Local Distributed Distributed Intelligent Agents for Decision Making at Local Distributed Energy Resource (DER) Levels Speaker(s): David Cohen Date: June 3, 2005 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Peng Xu Our goals are to develop and commercialize a system of adaptive, intelligent software components which run at distributed locations (DER-level) on the energy network to improve the reliability, efficiency, and security of the U.S. electrical distribution network. We are developing GridAgents, an enabling software technology framework and platform using a distributed multi-agent systems approach for advanced communications and control capabilities (large- scale automated demand response, distribution automation control, and Microgrid control applications). For more

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Commercial Building Energy Asset Score System: Program Overview and Technical Protocol (Version 1.0)  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system that includes an energy asset score tool to help building owners evaluate their buildings with respect to the score system. The goal of the energy asset score system is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system will allow building owners and managers to compare their building infrastructure against peers and track building upgrade progress over time. The system can also help other building stakeholders (e.g., building operators, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from their operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset score tool. This report also describes alternative methods that were considered prior to developing the current approach. Finally, this report describes a few features of the program where alternative approaches are still under evaluation.

Wang, Na; Gorrissen, Willy J.

2013-01-11T23:59:59.000Z

262

Automated Morphology Analysis of Nanoparticles  

E-Print Network [OSTI]

of this dissertation is to develop automated morphology analysis methods. Morphology analysis is comprised of three tasks: separate individual particles from an agglomerate of overlapping nano-objects (image segmentation); infer the particle's missing contours (shape...

Park, Chiwoo

2012-10-19T23:59:59.000Z

263

Aspects of automation mode confusion  

E-Print Network [OSTI]

Complex systems such as commercial aircraft are difficult for operators to manage. Designers, intending to simplify the interface between the operator and the system, have introduced automation to assist the operator. In ...

Wheeler, Paul H. (Paul Harrison)

2007-01-01T23:59:59.000Z

264

Technology modernization assessment flexible automation  

SciTech Connect (OSTI)

The objectives of this report are: to present technology assessment guidelines to be considered in conjunction with defense regulations before an automation project is developed to give examples showing how assessment guidelines may be applied to a current project to present several potential areas where automation might be applied successfully in the depot system. Depots perform primarily repair and remanufacturing operations, with limited small batch manufacturing runs. While certain activities (such as Management Information Systems and warehousing) are directly applicable to either environment, the majority of applications will require combining existing and emerging technologies in different ways, with the special needs of depot remanufacturing environment. Industry generally enjoys the ability to make revisions to its product lines seasonally, followed by batch runs of thousands or more. Depot batch runs are in the tens, at best the hundreds, of parts with a potential for large variation in product mix; reconfiguration may be required on a week-to-week basis. This need for a higher degree of flexibility suggests a higher level of operator interaction, and, in turn, control systems that go beyond the state of the art for less flexible automation and industry in general. This report investigates the benefits and barriers to automation and concludes that, while significant benefits do exist for automation, depots must be prepared to carefully investigate the technical feasibility of each opportunity and the life-cycle costs associated with implementation. Implementation is suggested in two ways: (1) develop an implementation plan for automation technologies based on results of small demonstration automation projects; (2) use phased implementation for both these and later stage automation projects to allow major technical and administrative risk issues to be addressed. 10 refs., 2 figs., 2 tabs. (JF)

Bennett, D.W.; Boyd, D.R.; Hansen, N.H.; Hansen, M.A.; Yount, J.A.

1990-12-01T23:59:59.000Z

265

The 'Problem' with Automation: Inappropriate Feedback and Interaction, not 'Over-Automation'  

Science Journals Connector (OSTI)

12 April 1990 research-article The 'Problem' with Automation: Inappropriate Feedback and Interaction, not 'Over-Automation' D. A. Norman As automation increasingly takes its place in industry, especially high risk industry...

1990-01-01T23:59:59.000Z

266

Type of automation failure: the effects on trust and reliance in automation.  

E-Print Network [OSTI]

??Past automation research has focused primarily on machine-related factors (e.g., automation reliability) and human-related factors (e.g., accountability). Other machine-related factors such as type of automation… (more)

Johnson, Jason D.

2004-01-01T23:59:59.000Z

267

Participation through Automation: Fully Automated Critical Peak Pricing in Commercial Buildings  

E-Print Network [OSTI]

Figure 2. Demand Response Automation Server and BuildingII system to notify the Automation Server of an up comingoccurs day-ahead). 2. The Automation Server posts two pieces

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

268

Assessing business models arising from the integration of distributed energy systems in the Chilean electric power system  

E-Print Network [OSTI]

Electric power systems are more than just networks of generation, transmission and distribution assets. They are socio-technical systems, involving regulation, markets and technology availability. Presently, the dynamic ...

Le Dantec, Jorge I. (Jorge Ignacio)

2014-01-01T23:59:59.000Z

269

Open Automated Demand Response for Small Commerical Buildings  

E-Print Network [OSTI]

of Fully Automated Demand  Response in Large Facilities.  Fully Automated Demand Response Tests in Large Facilities.  Open Automated  Demand Response Communication Standards: 

Dudley, June Han

2009-01-01T23:59:59.000Z

270

Scenarios for Consuming Standardized Automated Demand Response Signals  

E-Print Network [OSTI]

of Fully Automated Demand Response in Large Facilities.Fully Automated Demand Response Tests in Large Facilities.Interoperable Automated Demand Response Infrastructure.

Koch, Ed

2009-01-01T23:59:59.000Z

271

Automation World Features New White Paper on Wireless Security...  

Broader source: Energy.gov (indexed) [DOE]

Automation World Features New White Paper on Wireless Security Automation World Features New White Paper on Wireless Security The April 2009 issue of Automation World magazine...

272

Translating sustainability concerns at plant level asset operations: industrial performance assessment  

Science Journals Connector (OSTI)

The global society is threatened by the amount of plant level asset exploitation needed to satisfy the growing energy demand. The availability of a plentiful and affordable supply of energy is a requirement for the economic and societal pillars of sustainable development. In this context, the oil and gas industry will play a major role in the global energy mix for many years until alternate sources of energy become available and economically viable. During this transition period, the oil and gas industry has a vital responsibility for managing asset operations at the plant level safely and economically whilst minimising the burden to society and the environment. This manuscript reviews current trends toward sustainable asset performance. It also presents a framework and a model for implementing the framework. The suggested model enables industrial practitioners to assess the gaps between corporate level sustainability concerns and plant level execution of them.

R.M. Chandima Ratnayake

2012-01-01T23:59:59.000Z

273

Disciplined agility for process control & automation ; Disciplined agility for process control and automation .  

E-Print Network [OSTI]

??Process automation vendors must consider agility as a basis to gain a competitive edge in innovation. Process Automation systems can impact the operating cost of… (more)

Tibazarwa, Augustine

2009-01-01T23:59:59.000Z

274

Trust in automated systems the effect of automation level on trust calibration .  

E-Print Network [OSTI]

??Automated systems perform functions that were previously executed by a human. When using automation, the role of the human changes from operator to supervisor. For… (more)

Walliser, James C.

2011-01-01T23:59:59.000Z

275

DOE Commercial Building Energy Asset Rating: Market Research and Program Direction  

SciTech Connect (OSTI)

This paper presents the development of a voluntary energy asset rating system, to evaluate the physical characteristics and as-built energy efficiency of new and existing commercial buildings. The energy asset rating system is intended to enable commercial building stakeholders to directly compare expected as-built energy performance among similar buildings and to analyze the potential for capital improvements to increase energy efficiency cost-effectively. Market research has been performed to understand the market demand and how to communicate energy and cost savings to owners, investors, financiers, and others to overcome market barriers and motivate capital investment in building energy efficiency. The paper discusses the findings of the market research. Building owners are concerned about redundancy, conflicting requirements, and cost. They also pointed out a data gap and desire a rating program that identifies improvement opportunities. A meaningful linkage between the energy asset rating and other rating systems is essential. Based on the findings, criteria for a successful energy asset rating program have been developed to direct the program design, including validity of ratings, actionable, cost effective recommendations, effective quality control, integration with other rating systems, and necessary training and education. In addition to the rating system, an asset rating tool is being developed to reduce cost and increase standardization, allowing for consistent and reliable comparisons among and between buildings. The asset rating tool is the first step in the process by which owners can enter information about their building structure and receive information on the building’s modeled performance and recommended efficiency measures.

Wang, Na; Taylor, Cody; McCabe, Molly J.

2012-08-12T23:59:59.000Z

276

LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-024 Site-Selection Process  

Broader source: Energy.gov (indexed) [DOE]

LIFE LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-024 Site-Selection Process March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management This page intentionally left blank. Contents GPG-FM-024 March 1996 iii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Site Selection, NEPA, and Comprehensive Land-Use Planning . . . . . . . . . . . . . . 2 2. PRINCIPLES AND PROCESSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1 Formal (Program Directed or Competed) Site Selection . . . . . . . . . . . . . . . . . . . 5 2.1.1 The Site-Selection Official . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1.2 Site-Selection Team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.1.3 Determining Task Scope

277

Blots, bovines, buildings, businesses and brands: monitoring the landscape of rural assets  

Science Journals Connector (OSTI)

This longitudinal study monitors changes in the rural landscape of Scotland, and focuses on the impacts of developments on land use, buildings and businesses. It integrates planning policy with data from rural and agricultural reports. The research findings support contemporaneous literature on migration and show reductions in farm operations based on 'change of use' planning applications. A number of examples of planning applications are presented. Overall, the findings suggest shifts in the balance sheet of rural assets with upwards trends in asset conversion. The findings do not provide evidence of strong connectivity with innovative activity and new firm formation appears rather localised.

Anne M.J. Smith

2008-01-01T23:59:59.000Z

278

Fact Sheet: Protecting Intelligent Distributed Power Grids Against Cyber Attacks  

Broader source: Energy.gov (indexed) [DOE]

Protecting Intelligent Distributed Protecting Intelligent Distributed Power Grids Against Cyber Attacks Development of a novel distributed and hierarchical security layer specific to intelligent grid design Intelligent power grids are interdependent energy management systems- encompassing generation, distribution, IT networks, and control systems-that use automated data analysis and demand response capabilities to increase system functionality, efficiency, and reliability. But increased interconnection and automation over a large geographical area requires a distributed and hierarchical approach to cyber security. This two-year project will develop three security components unique to intelligent power grids. The first is an automated

279

Power Electronics Design of a Solar Powered In-car Wireless Tag for Asset Tracking and Parking Applications  

E-Print Network [OSTI]

Power Electronics Design of a Solar Powered In-car Wireless Tag for Asset Tracking and Parking and testing of a power conditioning circuit for a solar powered in-car wireless tag for asset tracking. A suitable solar cell was chosen for its high power density. Charging circuit, hysteresis control circuit

280

Revised Statement of Investment Policies and Guidelines at BonaVista Asset Management Ltd. August 16, 2010  

E-Print Network [OSTI]

. Revised Statement of Investment Policies and Guidelines at BonaVista Asset Management Ltd. August 16, 2010 Plan sponsors may wish to consider whether this investment update has any implications for the investment options available within their plan. Effective June 2010, BonaVista Asset Management Ltd. (Bona

Northern British Columbia, University of

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Chapter 8 - Automation and Monitoring  

Science Journals Connector (OSTI)

This chapter begins with the topic of process automation which has the intent of making repetitive tasks more consistent, faster, and cheaper. As part of this discussion, we talk about how to determine if a process should be automated, how to document the process in preparation for automation, and how to perform the actual automation. A variety of scripting languages can be used to perform process automation and general best practices for scripting these processes is discussed as well as some thoughts on how to choose the right scripting language for the job. The second part of the chapter is all about monitoring of enterprise applications. Key performance indicators (KPIs) that give insight into the enterprise application’s performance over time as well as determining when to alert the enterprise applications administrator to potential problems within the application are discussed. Alerts are another important topic associated with enterprise application monitoring that is discussed including how to properly tune alerts through the selection of appropriate KPIs, retry counts, and retry intervals.

Jeremy Faircloth

2014-01-01T23:59:59.000Z

282

Event based Control for Distributed Systemsy  

E-Print Network [OSTI]

's wireless control systems Home automation Transportation networksHome automationIndustrial automation Home

Johansson, Karl Henrik

283

Automated Demand Response Opportunities in Wastewater Treatment Facilities  

E-Print Network [OSTI]

Interoperable Automated Demand Response Infrastructure,study of automated demand response in wastewater treatmentopportunities for demand response control strategies in

Thompson, Lisa

2008-01-01T23:59:59.000Z

284

Automation in image cytometry : continuous HCS and kinetic image cytometry  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Automation in Image Cytometry:xiv Abstract of Dissertation Automation in Image Cytometry:

Charlot, David J.

2012-01-01T23:59:59.000Z

285

Automation of Fluorous Solid-Phase Extraction for Parallel Synthesis  

Science Journals Connector (OSTI)

Automation of Fluorous Solid-Phase Extraction for Parallel Synthesis ... • Cartridge conditioning, sample loading, elution, and rinsing are automated. ...

Wei Zhang; Yimin Lu

2006-10-17T23:59:59.000Z

286

Open Automated Demand Response for Small Commerical Buildings  

E-Print Network [OSTI]

communications.    Automated Logic Model  Vendor  Load Type of the HVAC.   Automated Logic Model  Vendor  Load Type 

Dudley, June Han

2009-01-01T23:59:59.000Z

287

The Departments real property assets are vital to the accomplishment of its mission  

Broader source: Energy.gov (indexed) [DOE]

16 January 2007 TABLE OF CONTENTS: SECTION 1: Three Year Rolling Time Line Overview....................................1 Introduction.....................................................................................1 Summary of Accomplishments..........................................................1 Facilities Planning Process...............................................................2 Performance Measurement Framework..............................................3 Desired Management Outcomes and Measures....................................4 SECTION 2: Performance Measures...........................................................4 Asset Utilization...............................................................................5

288

The Department's real property assets are vital to the accomplishment of its mission  

Broader source: Energy.gov (indexed) [DOE]

i i Department of Energy Three Year Rolling Timeline; Implementing the Goals and Objectives of Asset Management Plan Prepared by: Office of Engineering and Construction Management Fiscal Year 2012 Update ii TABLE OF CONTENTS: SECTION 1: Three Year Rolling Time Line Overview....................................1 Introduction.....................................................................................1 Summary of Accomplishments..........................................................1 Facilities Planning Process...............................................................4 Performance Measurement Framework..............................................5

289

A Service-Oriented Architecture for Electric Power Transmission System Asset Management  

E-Print Network [OSTI]

of Electrical & Computer Engineering Iowa State University Ames, IA 50011-1040 USA {jpathak, power plants and support structures. Maintaining these assets to reliably deliver electric energy at low prices is critical for a nation's growth and development. Towards this end, we describe a novel service

Honavar, Vasant

290

A New Asset Pricing Model based on the Zero-Beta CAPM: Theory and Evidence  

E-Print Network [OSTI]

This work utilizes zero-beta CAPM to derive an alternative form dubbed the ZCAPM. The ZCAPM posits that asset prices are a function of market risk composed of two components: average market returns and cross-sectional market volatility. Market risk...

Liu, Wei

2013-05-08T23:59:59.000Z

291

Home ownership as wealth over the life cycle European Household Motivation for Residential Assets  

E-Print Network [OSTI]

Home ownership as wealth over the life cycle European Household Motivation for Residential Assets Current situation and future prospects INTRODUCTION Encouraging Home Ownership Most countries encourage a country's wealth and the proportion of home owners. 44 Homeownership rates in Western Europe (Source: EMF

Birmingham, University of

292

Stranded Vehicles: How Gasoline Taxes Change the Value of Households' Vehicle Assets  

E-Print Network [OSTI]

Stranded Vehicles: How Gasoline Taxes Change the Value of Households' Vehicle Assets Meghan Busse pollution caused by the burning of fossil fuels. Argu- ments against energy taxes, and gasoline taxes more incidence of the tax. We study the effect of a gasoline tax using changes in vehicle values. We construct

Rothman, Daniel

293

Process Control and Automation: The Bagrit Vision  

Science Journals Connector (OSTI)

Automation, broadly defined as the computer-assisted control of industrial processes, covers a wide spectrum of applications. Here we need to narrow the spectrum somewhat, so as to focus on the word automation as...

Emeritus Professor Simon Lavington

2011-01-01T23:59:59.000Z

294

Microcomputer Applications in Power System Substation Automation  

Science Journals Connector (OSTI)

The object of this chapter is to describe power system applications of microcomputers, particularly in the area of power substation automation.The major functions required in substation automation are reviewed an...

C. T. Nguyen; R. Grondin; A. St-Jacques…

1983-01-01T23:59:59.000Z

295

Home Automation with ZigBee  

Science Journals Connector (OSTI)

This article discusses a topic of home automation, also called domotics, and provides an ... advantages provided by ZigBee wireless networking standard for home automation solutions. ZigBee protocol implementatio...

Maxim Osipov

2008-01-01T23:59:59.000Z

296

Disciplined agility for process control & automation  

E-Print Network [OSTI]

Process automation vendors must consider agility as a basis to gain a competitive edge in innovation. Process Automation systems can impact the operating cost of manufacturing equipment, the safe control of large quantities ...

Tibazarwa, Augustine

2009-01-01T23:59:59.000Z

297

Technical University of Denmark rsted DTU Automation  

E-Print Network [OSTI]

Technical University of Denmark �rsted · DTU Automation Project: SICAM - SIngle Conversion stage based SICAM using an LC-network Petar Ljusev, MSc., Ph.D. student, �rsted · DTU Automation e-mail: pl

298

Automated Operating Procedures for Transfer Limits  

E-Print Network [OSTI]

Automated Operating Procedures for Transfer Limits Final Project Report Power Systems Engineering · Illinois · Iowa State · Texas A&M · Washington State · Wisconsin Automated Operating Procedures

299

Automated Resoning in Modal Logics 0 (GENERAL PURPOSE) AUTOMATED REASONING IN MODAL LOGICS  

E-Print Network [OSTI]

Automated Resoning in Modal Logics 0 (GENERAL PURPOSE) AUTOMATED REASONING IN MODAL LOGICS BRANDEN FITELSON Department of Philosophy San Jos�e State University & Automated Reasoning Group.wisc.edu/fitelson BF @ AR @ MCS @ ANL & Philosophy @ SJSU May 16, 2002 Automated Resoning in Modal Logics 1

Fitelson, Branden

300

Automated Video-Based Fall Detection  

E-Print Network [OSTI]

home assistive monitoring uses technology such as sensors and cameras to aid live-alone aging persons, typically involving automation.

Edgcomb, Alex Daniel

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

The Home Energy Scoring Tool: A Simplified Asset Rating for Single Family  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Home Energy Scoring Tool: A Simplified Asset Rating for Single Family The Home Energy Scoring Tool: A Simplified Asset Rating for Single Family Homes Title The Home Energy Scoring Tool: A Simplified Asset Rating for Single Family Homes Publication Type Conference Proceedings LBNL Report Number LBNL-5714E Year of Publication 2012 Authors Bourassa, Norman, Leo I. Rainer, Evan Mills, and Joan Glickman Conference Name 2012 ACEEE Summer Study on Energy Efficiency in Buildings Date Published 05/2012 Conference Location Pacific Grove, CA, USA Abstract In 2010, the U.S. Department of Energy (DOE) and Lawrence Berkeley National Laboratory (LBNL) initiated development of a new web-based computer tool and method for providing an energy asset rating of single-family homes. The resulting Home Energy Scoring Tool (http://homeenergyscore.lbl.gov) is a key component of the DOE's Home Energy Score Program (http://www.homeenergyscore.gov) for residential building energy labeling, a voluntary national asset rating method that uses a simplified and standardized energy assessment process. The Scoring Tool component of the program has been designed to support the existing energy analysis marketplace by providing a substantially lower-cost entry-level assessment method. This paper presents technical details of the Home Energy Scoring Tool itself, including the Scoring Tool's relationship to the Home Energy Saver building simulation engine, the Home Energy Score calculation methodology, and the web services feature that allows any qualified third-party software developer to integrate the Home Energy Score method into their own webbased applications and market delivery strategy.

302

Protecting Intelligent Distributed Power Grids Against Cyber Attacks - May  

Broader source: Energy.gov (indexed) [DOE]

Protecting Intelligent Distributed Power Grids Against Cyber Protecting Intelligent Distributed Power Grids Against Cyber Attacks - May 2008 Protecting Intelligent Distributed Power Grids Against Cyber Attacks - May 2008 Development of a novel distributed and hierarchical security layer specific to intelligent grid design will help protect intelligent distributed power grids from cyber attacks. Intelligent power grids are interdependent energy management systems-encompassing generation, distribution, IT networks, and control systems-that use automated data analysis and demand response capabilities to increase system functionality, efficiency, and reliability. But increased interconnection and automation over a large geographical area requires a distributed and hierarchical approach to cybersecurity. Protecting Intelligent Distributed Power Grids Again Cyber Attacks.pdf

303

Technical Report TRARP1695 Automated Reasoning Project  

E-Print Network [OSTI]

Technical Report TR­ARP­16­95 Automated Reasoning Project Research School of Information Sciences Heuerding Automated Institute for Applied Mathematics Reasoning Project and Computer Science ANU University that contains automated proof procedures based on modal Gentzen systems for numerous propositional (nonclassical

Goré, Rajeev

304

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS  

E-Print Network [OSTI]

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS: 2006 PROGRAM DESCRIPTION AND RESULTS) for development of the DR Automation Server System This project could not have been completed without extensive: Greg Watson and Mark Lott · C&C Building Automation: Mark Johnson and John Fiegel · Chabot Space

305

INTEGRATING AUTOMATION DESIGN INFORMATION WITH XML  

E-Print Network [OSTI]

INTEGRATING AUTOMATION DESIGN INFORMATION WITH XML Mika Viinikkala, Seppo Kuikka Institute of Automation and Control, Tampere University of Technology, P.O. Box 692, 33101 Tampere, Finland Email: mika.viinikkala@tut.fi, seppo.kuikka@tut.fi Keywords: Systems integration, XML, automation design Abstract: This paper presents

306

TAMPERE UNIVERSITY OF TECHNOLOGY DEPARTMENT OF AUTOMATION  

E-Print Network [OSTI]

TAMPERE UNIVERSITY OF TECHNOLOGY DEPARTMENT OF AUTOMATION An Intelligent Web Service for Operation 2004 Examiner: Prof. Seppo Kuikka #12;2 Abstract TAMPERE UNIVERSITY OF TECHNOLOGY Automation Degree Program Institute of Automation and Control Jaakkola, Veli-Pekka: An Intelligent Web Service for Operation

307

Automating Shallow Seismic Imaging  

SciTech Connect (OSTI)

This seven-year, shallow-seismic reflection research project had the aim of improving geophysical imaging of possible contaminant flow paths. Thousands of chemically contaminated sites exist in the United States, including at least 3,700 at Department of Energy (DOE) facilities. Imaging technologies such as shallow seismic reflection (SSR) and ground-penetrating radar (GPR) sometimes are capable of identifying geologic conditions that might indicate preferential contaminant-flow paths. Historically, SSR has been used very little at depths shallower than 30 m, and even more rarely at depths of 10 m or less. Conversely, GPR is rarely useful at depths greater than 10 m, especially in areas where clay or other electrically conductive materials are present near the surface. Efforts to image the cone of depression around a pumping well using seismic methods were only partially successful (for complete references of all research results, see the full Final Technical Report, DOE/ER/14826-F), but peripheral results included development of SSR methods for depths shallower than one meter, a depth range that had not been achieved before. Imaging at such shallow depths, however, requires geophone intervals of the order of 10 cm or less, which makes such surveys very expensive in terms of human time and effort. We also showed that SSR and GPR could be used in a complementary fashion to image the same volume of earth at very shallow depths. The primary research focus of the second three-year period of funding was to develop and demonstrate an automated method of conducting two-dimensional (2D) shallow-seismic surveys with the goal of saving time, effort, and money. Tests involving the second generation of the hydraulic geophone-planting device dubbed the ''Autojuggie'' showed that large numbers of geophones can be placed quickly and automatically and can acquire high-quality data, although not under rough topographic conditions. In some easy-access environments, this device could make SSR surveying considerably more efficient and less expensive, particularly when geophone intervals of 25 cm or less are required. The most recent research analyzed the difference in seismic response of the geophones with variable geophone spike length and geophones attached to various steel media. Experiments investigated the azimuthal dependence of the quality of data relative to the orientation of the rigidly attached geophones. Other experiments designed to test the hypothesis that the data are being amplified in much the same way that an organ pipe amplifies sound have so far proved inconclusive. Taken together, the positive results show that SSR imaging within a few meters of the earth's surface is possible if the geology is suitable, that SSR imaging can complement GPR imaging, and that SSR imaging could be made significantly more cost effective, at least in areas where the topography and the geology are favorable. Increased knowledge of the Earth's shallow subsurface through non-intrusive techniques is of potential benefit to management of DOE facilities. Among the most significant problems facing hydrologists today is the delineation of preferential permeability paths in sufficient detail to make a quantitative analysis possible. Aquifer systems dominated by fracture flow have a reputation of being particularly difficult to characterize and model. At chemically contaminated sites, including U.S. Department of Energy (DOE) facilities and others at Department of Defense (DOD) installations worldwide, establishing the spatial extent of the contamination, along with the fate of the contaminants and their transport-flow directions, is essential to the development of effective cleanup strategies. Detailed characterization of the shallow subsurface is important not only in environmental, groundwater, and geotechnical engineering applications, but also in neotectonics, mining geology, and the analysis of petroleum reservoir analogs. Near-surface seismology is in the vanguard of non-intrusive approaches to increase knowledge of the shallow subsurface; our

Steeples, Don W.

2004-12-09T23:59:59.000Z

308

Chapter 13 - Commercial Building Automation  

Science Journals Connector (OSTI)

A Building Automation System (BAS) is a computerized, intelligent system that controls and measures lighting, climate, security, and other mechanical and electrical systems in a building. The purpose of a BAS is typically to reduce energy and maintenance costs, as well as to increase control, comfort, reliability, and ease of use for maintenance staff and tenants.

Jan Höller; Vlasios Tsiatsis; Catherine Mulligan; Stamatis Karnouskos; Stefan Avesand; David Boyle

2014-01-01T23:59:59.000Z

309

Automated computation meets hot QCD  

E-Print Network [OSTI]

We give a short review on recent progress in the field of automated calculations in finite-temperature field theory, where integration-by-parts techniques have proven (almost) as useful as in the zero-temperature case. Furthermore, we provide one concrete example of an evaluation of a new three-loop master sum-integral that exhibits maximal divergence.

Ioan Ghisoiu; York Schroder

2012-10-19T23:59:59.000Z

310

ALMS: Automated logic mapping system  

Science Journals Connector (OSTI)

ALMS is a set of design automation computer programs which accepts as input a description of a logic design, specifications of modules (e.g., chips, cards, etc.) into which the blocks of the design are to be partitioned or mapped, and some constraints ...

R. L. Russo; P. K. Wolff, Sr.

1971-06-01T23:59:59.000Z

311

Rockwell Automation - Owens Corning Teaming Profile  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rockwell Automation Owens Corning Rockwell Automation Owens Corning 1201 S. Second Street 247 York Road Milwaukee, WI 53204 Guelph, Ontario N1E 3G4 Business: Industrial Automation Business: Textile / Fiber Nigel Hitchings Frank Peel Marketing Manager Electrical Support Specialist Phone: 508-357-8404 Phone: 519-823-7208 Email: nehitchings@ra.rockwell.com Email: frank.peel@owenscorning.com Owens Corning partners with Rockwell Automation to retrofit fans with VFDs, saving $67,000 annually Project Scope Owens Corning and Rockwell Automation installed Variable Frequency Drives (VFDs) on one 125HP cooling fan and three 40HP recirculation fans at the Owens Corning Guelph Glass Plant. The VFDs were integrated with the existing Rockwell Automation programmable automation controller to collect

312

Specimen coordinate automated measuring machine/fiducial automated measuring machine  

SciTech Connect (OSTI)

The Specimen coordinate Automated Measuring Machine (SCAMM) and the Fiducial Automated Measuring Machine (FAMM) is a computer controlled metrology system capable of measuring length, width, and thickness, and of locating fiducial marks. SCAMM and FAMM have many similarities in their designs, and they can be converted from one to the other without taking them out of the hot cell. Both have means for: supporting a plurality of samples and a standard; controlling the movement of the samples in the +/- X and Y directions; determining the coordinates of the sample; compensating for temperature effects; and verifying the accuracy of the measurements and repeating as necessary. SCAMM and FAMM are designed to be used in hot cells.

Hedglen, Robert E. (Bethel Park, PA); Jacket, Howard S. (Pittsburgh, PA); Schwartz, Allan I. (Turtle Creek, PA)

1991-01-01T23:59:59.000Z

313

EMAB Briefing on Capital Assets Projects and Operations Activities Presentation by Mark Gilbertson  

Broader source: Energy.gov (indexed) [DOE]

Capital Asset Projects and Operations Activities Capital Asset Projects and Operations Activities www.em.doe.gov 1 Presented to Environmental Management Advisory Boards Mark Gilbertson Deputy Assistant Secretary for Site Restoration Office of Environmental Management May 31, 2012 We reduce risks and protect our workers, our communities and the environment through cleanup Our work is urgent and essential to the health and economic vitality of our communities and the nation and positions our Sites for future missions and use Our mission is not discretionary - it is a congressional mandate to D&D the gaseous diffusion plant under the U.S. Energy Policy Act of 1992 and a federal obligation to address the cold war environmental legacy cleanup and honor our regulatory commitments Environmental Management:

314

DOE Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle -- Final Report  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle Final Report G Redmond Wolf J Dohack LD Winges Battelle Centers for Public Health Research and Evaluation Seattle, Washington Prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Washington, D.C. February 2012 DOE Commercial Building Energy Asset Rating Program Focus Groups with Primary Stakeholders in Seattle Final Report G Redmond Wolf J Dohack LD Winges Centers for Public Health Research and Evaluation Seattle, Washington Prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Washington, D.C. February 2012 Contents 1.0 Introduction .................................................................................................................................. 1

315

Testing of complex IEC 61850 based substation automation systems  

Science Journals Connector (OSTI)

The integration of multifunctional intelligent substation devices (ISDs), in complex substation or power plant automation systems, requires the development of methods and tools for their testing that will ensure the correct operation of protection, control, monitoring, recording and metering functions, under normal and abnormal system conditions. The new IEC 61850 standard for communication networks and systems in substations allows the development of high-speed peer-to-peer communications based distributed applications, based on multicast of status changes or sampled analogue values. This paper details the requirements for the testing of complex substation automation systems. The testing methods need to correspond to the functional hierarchy of the substation automation system. Functional element testing, integration and system testing are discussed. Systems with Substation Bus only, and with both Process Bus and Substation Bus, are considered. A method for the testing of both types of system is proposed, based on a specific order of system components testing. Solutions for the testing of the individual components of the IEC 61850 based system, as well as for the testing of distributed applications, are described at the end of the paper.

Alexander Apostolov

2008-01-01T23:59:59.000Z

316

The Departments real property assets are vital to the accomplishment of its mission  

Broader source: Energy.gov (indexed) [DOE]

i i Department of Energy Three Year Rolling Timeline; Implementing the Goals and Objectives of DOE's Asset Management Plan Prepared by: Office of Acquisition and Project Management Fiscal Year 2013 Update March 2013 ii TABLE OF CONTENTS: SECTION 1: Three Year Rolling Time Line Overview....................................1 Introduction.....................................................................................1 Summary of Accomplishments..........................................................1 Facilities Planning Process...............................................................5 Performance Measurement Framework..............................................7 Desired Management Outcomes and Measures....................................8

317

Intertemporally non?separable monetary?asset risk adjustment and aggregation  

E-Print Network [OSTI]

of monetary assets, and originated the Divisia monetary aggregates to track the theory’s quantity and price aggregator functions nonparametrically. The monetary aggregation theory was extended to risk by Barnett (1995) and Barnett, Hinich, and Yue (2000...). In producing the Divisia index approximations to the theory’s aggregator functions under risk, Barnett, Liu, and Jensen (1997) and Barnett and Liu (2000) showed that a risk adjustment term should be added to the certainty-equivalent user cost in a...

Barnett, William A.; Wu, Shu

2004-01-01T23:59:59.000Z

318

Towards Energy Efficient Building Assets: A Review on Sub-Tropical Climate  

E-Print Network [OSTI]

of the energy demand, to conserve energy, to improve the comfort levels including indoor-air quality, and to increase the building’s productivity through leveraging information. The idea of integrated building services functions is beneficial from... air conditioning, radiant cooling, desiccant cooling, and passive solar cooling are important in terms of energy use and indoor environment of building. Energy efficient approach enables building assets to reduce energy consumption, improve...

Chowdhury, A. A.; Rasul, M. G.; Khan, M. M. K.

2006-01-01T23:59:59.000Z

319

Kansas Energy 2000. [Inventory of Energy Related Assets. Research Area Summary  

SciTech Connect (OSTI)

The Inventory of Energy Related Assets: Research Area Summary is a compilation of resume-type information on energy researchers in the state of Kansas. Researchers are placed in one of four categories: Fossil Energy Research, Alternative Energy Sources, Electric Power Generation and Usage, and Other Energy Research. Each research biography includes a synopsis of recent research, sources of support, and areas of research emphasis.

Legg, J.; Nellis, D.; Simons, G.

1992-03-01T23:59:59.000Z

320

Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.

Wang, Na; Goel, Supriya; Makhmalbaf, Atefe

2013-08-09T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference  

Broader source: Energy.gov (indexed) [DOE]

NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference October 1, 2009 More than 150 energy sector leaders-including nearly 100 asset owners and operators-gathered at the 2009 EnergySec Annual Summit in Seattle, WA, on Sept. 23-24, where researchers from the Department of Energy's National SCADA Test Bed (NSTB) Program gave a four-hour demonstration and presentation of their Roadmap-related control systems security work. EnergySec is an information sharing forum with more than 230 utility members representing 75 energy companies across the nation. Its fifth annual conference drew asset owners, vendors, and government representatives for presentations and discussions on NERC CIP standards, collaborative industry efforts

322

Automated Export Control.PDF  

Broader source: Energy.gov (indexed) [DOE]

3 3 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS INSPECTION OF THE DEPARTMENT OF ENERGY'S AUTOMATED EXPORT CONTROL SYSTEM DECEMBER 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 December 7, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of the Department of Energy's Automated Export Control System" BACKGROUND The National Defense Authorization Act for Fiscal Year 2000 (NDAA for FY 2000) contained a provision that not later than March 30 of each year the President will submit to Congress, beginning in the year 2000 and ending in the year 2007, an annual report on the Government's policies and procedures with respect to the export of technologies and technical information with

323

Automated Transportation Management System (ATMS)  

Broader source: Energy.gov (indexed) [DOE]

Re evised June 2010 Re evised June 2010 Autom The Depa Transport an integra system al outbound air. Its ea 1989 DOE significant operationa commerce electronic rates, pre transporta users eva shipments opportunit logistics im ATMS is i radioactiv shipments System ATMS is a activities p packaging including materials. common s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al efficiency t e. Today's sy cally prepare s pare shipping ation bills befo aluate carrier s, and use co ties for system mprovements ts capability t ve and other h s in a comple Modules a modular sys performed by g and transpo radioactive a . Its modules shipment info eight bills, rate System Web Applic Carrier Eval Selection Automated

324

Automated Demand Response and Commissioning  

SciTech Connect (OSTI)

This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-04-01T23:59:59.000Z

325

Definition: Automated Voltage And Var Control | Open Energy Information  

Open Energy Info (EERE)

Voltage And Var Control Voltage And Var Control Jump to: navigation, search Dictionary.png Automated Voltage And Var Control Automated voltage and VAR control requires coordinated operation of reactive power resources such as capacitor banks, voltage regulators, transformer load-tap changers, and distributed generation (DG) with sensors, controls, and communications systems. These devices could operate autonomously in response to local events or in response to signals from a central control system.[1] View on Wikipedia Wikipedia Definition Also Known As Volt-VAR Control (VVC) Related Terms smart grid, Reactive Power References ↑ SmartGrid.gov 'Description of Functions' An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from

326

Convection automated logic oven control  

SciTech Connect (OSTI)

For the past few years, there has been a greater push to bring more automation to the cooling process. There have been attempts at automated cooking using a wide range of sensors and procedures, but with limited success. The authors have the answer to the automated cooking process; this patented technology is called Convection AutoLogic (CAL). The beauty of the technology is that it requires no extra hardware for the existing oven system. They use the existing temperature probe, whether it is an RTD, thermocouple, or thermistor. This means that the manufacturer does not have to be burdened with extra costs associated with automated cooking in comparison to standard ovens. The only change to the oven is the program in the central processing unit (CPU) on the board. As for its operation, when the user places the food into the oven, he or she is required to select a category (e.g., beef, poultry, or casseroles) and then simply press the start button. The CAL program then begins its cooking program. It first looks at the ambient oven temperature to see if it is a cold, warm, or hot start. CAL stores this data and then begins to look at the food`s thermal footprint. After CAL has properly detected this thermal footprint, it can calculate the time and temperature at which the food needs to be cooked. CAL then sets up these factors for the cooking stage of the program and, when the food has finished cooking, the oven is turned off automatically. The total time for this entire process is the same as the standard cooking time the user would normally set. The CAL program can also compensate for varying line voltages and detect when the oven door is opened. With all of these varying factors being monitored, CAL can produce a perfectly cooked item with minimal user input.

Boyer, M.A.; Eke, K.I. [Apollo U.S.A. Inc., Orlando, FL (United States)] [Apollo U.S.A. Inc., Orlando, FL (United States)

1998-03-01T23:59:59.000Z

327

Integration of automation design information using XML technologies  

E-Print Network [OSTI]

Integration of automation design information using XML technologies Master of Science Thesis Mika UNIVERSITY OF TECHNOLOGY DEPARTMENT OF AUTOMATION #12;2 Abstract TAMPERE UNIVERSITY OF TECHNOLOGY Automation Degree Program Institute of Automation and Control Viinikkala, Mika: Integration of automation design

328

Mobile home automation: merging mobile value added services and home automation technologies  

Science Journals Connector (OSTI)

In this paper we study mobile home automation, a field that emerges from an integration of mobile application platforms and home automation technologies. We motivate our research and provide ... options of how he...

Goetz Botterweck; J. Felix Hampe…

2009-06-01T23:59:59.000Z

329

Automated Surface Observing System: Standby Power Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Automated Automated Surface Observing System Standby Options Power Automated Surface Observing System (ASOS) General System Description * Self contained group of sensors and data gathering equipment that produces an automated weather observation * Weather observations support aviation, climate data, non government weather operations, public consumption, etc. * Initial deployment began in 1991 and continued through 1997 * Located at 884 sites nationwide, normally at airports * System has two distinct subsystems: Field installed equipment (DCP & Sensor Group) and an indoor processor (ACU) with peripherals * Separate facility power for DCP & Sensors and ACU 1 * measure and collect data * Located on the airport * back up group for 10 minutes * Currently pl

330

An Automated Raman Device for Gout Diagnosis  

Science Journals Connector (OSTI)

This study reports an automated Raman device to identify crystals in synovial aspirates from patients with gout symptoms. Combined with sample preparation, the device could diagnose...

Li, Bolan

331

Substation automation gains momentum with modern options  

SciTech Connect (OSTI)

This paper discusses issues associated with utility substation automation. Monitoring equipment for monitoring power flow, quality, and harmonics for three substations simultaneously is described.

Beaty, W.

1996-12-01T23:59:59.000Z

332

Automated Logic Restructuring with aSPFDs  

Science Journals Connector (OSTI)

This chapter presents a comprehensive methodology to automate logic restructuring in combinational and sequential circuits. This technique algorithmically constructs the required transformation by utilizing a ...

Yu-Shen Yang; Subarna Sinha; Andreas Veneris…

2011-01-01T23:59:59.000Z

333

Automated Transportation Management System (ATMS) | Department...  

Office of Environmental Management (EM)

of Energy's (DOE's) Automated Transportation Management System is an integrated web-based logistics management system allowing users to manage inbound and outbound freight...

334

Recommendation 207 : Automate the Stewardship Verification Process...  

Office of Environmental Management (EM)

recommends exploring ways to automate the stewardship tracking process and establish a web-based solution for managing long-term stewardship information for the Oak Ridge...

335

Chapter 38, Design Automation for Microelectronics, Springer Handbook of Automation Deming Chen  

E-Print Network [OSTI]

Chapter 38, Design Automation for Microelectronics, Springer Handbook of Automation Deming Chen of hardware and software systems in the past several decades. CAD techniques are the key driving forces behind techniques. In this chapter we will introduce the fundamentals of design automation as an engineering field

Chen, Deming

336

Automating Logical Preservation for Small Institutions with Hoppla  

E-Print Network [OSTI]

Automating Logical Preservation for Small Institutions with Hoppla Stephan Strodl, Petar Petrov and outsources digital preservation expertise. This paper presents the automated logical preservation process of automating logical preservation by outsourcing expertise. 1 Introduction Digital information form essential

337

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

Target Hayward Software client Automated Logic TargetAntioch Automated Logic Target Bakersfield Software client

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

338

Open Automated Demand Response Communications Specification (Version 1.0)  

E-Print Network [OSTI]

and Techniques for Demand Response. May 2007. LBNL-59975.to facilitate automating  demand response actions at the Interoperable Automated Demand Response Infrastructure,

Piette, Mary Ann

2009-01-01T23:59:59.000Z

339

Open Automated Demand Response Dynamic Pricing Technologies and Demonstration  

E-Print Network [OSTI]

Goodin. 2009. “Open Automated Demand Response Communicationsin Demand Response for Wholesale Ancillary Services. ” InOpen Automated Demand Response Demonstration Project. LBNL-

Ghatikar, Girish

2010-01-01T23:59:59.000Z

340

Home Automation : Smart home technology and template house design.  

E-Print Network [OSTI]

??In this thesis, home automation’s general knowledge, technology information and each component will be introduced to the reader in the first half of the whole… (more)

Zheng, Zeya

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple...  

Broader source: Energy.gov (indexed) [DOE]

5: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities July 29, 2013...

342

U-047: Siemens Automation License Manager Bugs Let Remote Users...  

Broader source: Energy.gov (indexed) [DOE]

7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or...

343

Appropriate automation of rail signalling systems: a human factors study.  

E-Print Network [OSTI]

??This thesis examines the effect of automation in the rail signalling environment. The level of automation in a system can be described as ranging along… (more)

Balfe, Nora

2010-01-01T23:59:59.000Z

344

Automation of amperometric titrations with rotating platinum electrodes  

Science Journals Connector (OSTI)

Automation of amperometric titrations with rotating platinum electrodes ... A modification of an earlier described apparatus allows for the automation of amperometric titrations with rotating platinum electrodes. ...

Eugene D. Olsen; Roger D. Walton

1966-01-01T23:59:59.000Z

345

V-132: IBM Tivoli System Automation Application Manager Multiple...  

Energy Savers [EERE]

32: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 -...

346

ISA Approves Standard for Wireless Automation in Process Control...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the...

347

Small- and Medium-Size Building Automation and Control System...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Small- and Medium-Size Building Automation and Control System Needs: Scoping Study Small- and Medium-Size Building Automation and Control System Needs: Scoping Study Emerging...

348

Universal software packages to model the distributed-parameter systems  

Science Journals Connector (OSTI)

Consideration was given to the universal software packages for modeling objects and distributed-parameter systems obeying the partial differential equations. The packages may serve as important tools for industrial automation because the majority of ... Keywords: 07.05.Tp

E. E. Dudnikov

2009-01-01T23:59:59.000Z

349

Demand Response and Open Automated Demand Response  

E-Print Network [OSTI]

LBNL-3047E Demand Response and Open Automated Demand Response Opportunities for Data Centers G described in this report was coordinated by the Demand Response Research Center and funded by the California. Demand Response and Open Automated Demand Response Opportunities for Data Centers. California Energy

350

Atlas Sodium Automated Batch Synthesis System  

E-Print Network [OSTI]

Atlas Sodium Automated Batch Synthesis System (Syrris) June 2013 #12;Introduction to the system · The Atlas Sodium system consists of an Atlas base equipped with a 400ºC hotplate, a stacking dry bath systemL) for automated addition and/or removal of solution. · The system is computer controlled by the Atlas software

Subramanian, Venkat

351

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Short Term Disability with Pay May 2011 #12;Processing a Short Term Disability with Pay ECR Search Page To process a Short Term Disability using the automated ECR process, follow the menu navigation below: Home > Employee Change Request (ECR) > Use > ECR Create

Huang, Jianyu

352

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Revise Existing SWB May 2011 #12;Processing a Short Work Break Date Revision ECR Search Page To process a Short Work Break Date revision using the automated ECR process, follow the menu navigation below: Home > Employee Change Request (ECR) > Use > ECR Create

Huang, Jianyu

353

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Employee Work Hours Change (Temporary Basis) May 2012 #12 Documentation May, 2012 When the Originator is ready to create an Hours Change Request using the automated ECR the instructions below: - Home > Employee Change Request (ECR) > Use > ECR Create · If you know the Name or Eagle

Huang, Jianyu

354

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Long Term Disability May 2011 #12;Processing a Long Term Disability LTD ECR Search Page To process an LTD transaction using the automated ECR process, follow the menu navigation below: Home > Employee Change Request (ECR) > Use > ECR Create 2 · If you know the Name or Eagle

Huang, Jianyu

355

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Leave of Absence May 2012 #12;2 Table of Contents Create the Originator is ready to create a Leave of Absence using the automated ECR process, he/she will follow the menu navigation below to access the employee search page and then use the instructions below: - Home > Employee

Huang, Jianyu

356

Technical University of Denmark rsted DTU Automation  

E-Print Network [OSTI]

Technical University of Denmark �rsted · DTU Automation Project: SICAM - SIngle Conversion stage;Isolated PDM and PWM DC-AC SICAMs Petar Ljusev, MSc., Ph.D. student, �rsted · DTU Automation e-mail: pl

357

D Riso-R-429 Automated Uranium  

E-Print Network [OSTI]

routinely used analytical techniques for uranium determina- tions in geological samples, fissionCM i D Riso-R-429 Automated Uranium Analysis by Delayed-Neutron Counting H. Kunzendorf, L. Løvborg AUTOMATED URANIUM ANALYSIS BY DELAYED-NEUTRON COUNTING H. Kunzendorf, L. Løvborg and E.M. Christiansen

358

Commercial Buildings: Asset Scoring Efforts and Request for Information: February 2013 webinar  

Broader source: Energy.gov (indexed) [DOE]

DOE Building Technologies Program DOE Building Technologies Program Commercial Buildings: Asset Scoring Efforts and Request for Information Joan Glickman February 21, 2013 Energy efficiency in buildings: The valuation conundrum Key actors all have reasons to maximize energy performance... � * Owners/Investors: Property value, competitive advantage * Operators: Reduced costs, increased NOI, fewer complaints * Financiers, Insurers: Lower risk * Tenants: Lower utility bills, improved comfort and productivity ....yet, market frequently still undervalues EE. Why? � * Difficult to get credible, comparable information at a low cost - No standard tools or methods exist to separately assess building infrastructure and energy systems * Transaction costs (i.e., auditing, collecting data, evaluating information) are

359

Review of grid connection requirements for generation assets in weak power grids  

Science Journals Connector (OSTI)

Abstract The integration of variable energy sources in weak power grids poses many technical and economic challenges. Both aspects have an impact on the development of grid codes, that is worth analysing. Grid codes shall be adapted to technical constraints in the corresponding power grid, such as the network strength and the characteristics of generation technologies. This paper reviews and compares technical requirements imposed on to generation assets in countries with very distinct characteristics, in order to analyse the influence of weakness and isolation of a power grid on the interconnection conditions imposed by system operators to grid users. Current and future regulation aspects are covered.

Agurtzane Etxegarai; Pablo Eguia; Esther Torres; Araitz Iturregi; Victor Valverde

2015-01-01T23:59:59.000Z

360

The role of the digital fault recorder in the automated substation  

SciTech Connect (OSTI)

This paper addresses the role of the digital fault recorder in the automated substation. The topics of the paper include distributed architecture, the substation LAN and reduced installation costs, multiple functions, improved substation intelligence, record generation and record merging, fault summaries, master station software, and future considerations.

Brandt, J.D. [Hathaway Corp., Littleton, CO (United States)

1996-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

A LIBRARY OF HVAC COMPONENT MODELS FOR USE IN AUTOMATED1 DIAGNOSTICS2  

E-Print Network [OSTI]

A LIBRARY OF HVAC COMPONENT MODELS FOR USE IN AUTOMATED1 DIAGNOSTICS2 3 4 Peng Xu, Philip Haves HVAC system (air handling units and air distribution systems). The models are used to predict of automatic documentation methods in the library. INTRODUCTION The increasing complexity of building HVAC

362

Optimization of automation: I. Estimation method of cognitive automation rates reflecting the effects of automation on human operators in nuclear power plants  

Science Journals Connector (OSTI)

Abstract Since automation was introduced in various industrial fields, the concept of the automation rate has been used to indicate the inclusion proportion of automation among all work processes or facilities. Expressions of the inclusion proportion of automation are predictable, as is the ability to express the degree of the enhancement of human performance. However, many researchers have found that a high automation rate does not guarantee high performance. Therefore, to reflect the effects of automation on human performance, this paper proposes a new estimation method of the automation rate that considers the effects of automation on human operators in nuclear power plants (NPPs). Automation in \\{NPPs\\} can be divided into two types: system automation and cognitive automation. Some general descriptions and characteristics of each type of automation are provided, and the advantages of automation are investigated. The advantages of each type of automation are used as measures of the estimation method of the automation rate. One advantage was found to be a reduction in the number of tasks, and another was a reduction in human cognitive task loads. The system and the cognitive automation rate were proposed as quantitative measures by taking advantage of the aforementioned benefits. To quantify the required human cognitive task loads and thus suggest the cognitive automation rate, Conant’s information-theory-based model was applied. The validity of the suggested method, especially as regards the cognitive automation rate, was proven by conducting experiments. The result showed that a decreased rate of the operator working time was significantly related to the cognitive automation rate and that the calculation of the cognitive task load was useful as a measure of the cognitive automation rate.

Seung Min Lee; Jong Hyun Kim; Poong Hyun Seong

2014-01-01T23:59:59.000Z

363

Automation of hydroelectric power plants  

SciTech Connect (OSTI)

This paper describes how the author's company has been automating its hydroelectric generating plants. The early automations were achieved with a relay-type supervisory control system, relay logic, dc tachometer, and a pneumatic gate-position controller. While this system allowed the units to be started and stopped from a remote location, they were operated at an output that was preset by the pneumatic control at the generating site. The supervisory control system at the site provided such information as unit status, generator breaker status, and a binary coded decimal (BCD) value of the pond level. The generating units are started by energizing an on-site relay that sets the pneumatic gate controller to a preset value above the synchronous speed of the hydroelectric generator. The pneumatic controller then opens the water-wheel wicket gates to the preset startup position. As the hydroelectric generator starts to turn, the machine-mounted dc tachometer produces a voltage. At a dc voltage equivalent to synchronous speed, the generator main breaker closes, and a contact from the main breaker starts a field-delay timer. Within a few seconds, the field breaker closes. Once the cycle is complete, a relay changes the pneumatic setpoint to a preset operating point of about 8/10 wicket gate opening.

Grasser, H.S. (Consolidated Papers, Inc., Wisconsin Rapids, WI (US))

1990-03-01T23:59:59.000Z

364

Automation of Network-Based Scientific Workflows  

SciTech Connect (OSTI)

Comprehensive, end-to-end, data and workflow management solutions are needed to handle the increasing complexity of processes and data volumes associated with modern distributed scientific problem solving, such as ultra-scale simulations and high-throughput experiments. The key to the solution is an integrated network-based framework that is functional, dependable, fault-tolerant, and supports data and process provenance. Such a framework needs to make development and use of application workflows dramatically easier so that scientists' efforts can shift away from data management and utility software development to scientific research and discovery An integrated view of these activities is provided by the notion of scientific workflows - a series of structured activities and computations that arise in scientific problem-solving. An information technology framework that supports scientific workflows is the Ptolemy II based environment called Kepler. This paper discusses the issues associated with practical automation of scientific processes and workflows and illustrates this with workflows developed using the Kepler framework and tools.

Altintas, I. [University of California, La Jolla; Barreto, R. [Oak Ridge National Laboratory (ORNL); Blondin, J. M. [North Carolina State University; Cheng, Z. [North Carolina State University; Critchlow, T. [Lawrence Livermore National Laboratory (LLNL); Khan, A. [University of Utah; Klasky, Scott A [ORNL; Ligon, J. [North Carolina State University; Ludaescher, B. [University of California, Davis; Mouallem, P. A. [North Carolina State University; Parker, S. [University of Utah; Podhorszki, Norbert [University of California, Davis; Shoshani, A. [Lawrence Berkeley National Laboratory (LBNL); Silva, C. [University of Utah; Vouk, M. A. [North Carolina State University

2007-01-01T23:59:59.000Z

365

Solar Automation Inc | Open Energy Information  

Open Energy Info (EERE)

Inc Inc Jump to: navigation, search Name Solar Automation Inc Place Albuquerque, New Mexico Zip NM 8110 Product Produces manufacturing equipment for PV cells. References Solar Automation Inc[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Solar Automation Inc is a company located in Albuquerque, New Mexico . References ↑ "Solar Automation Inc" Retrieved from "http://en.openei.org/w/index.php?title=Solar_Automation_Inc&oldid=351247" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services

366

Substation automation -- a ``bottoms up`` approach  

SciTech Connect (OSTI)

The proliferation of multi-purpose intelligent electronic devices in substations brought the availability of abundant and often overlapping data at the substation. This data can be used for improving the operation and maintenance of the substations and the entire power system. The objective of substation automation is to use technology to gather, consolidate and utilize this data for increasing the efficiency of power system operation and maintenance. Often automation functions are developed and offered around the capabilities of the preferred hardware and software of the integrator. Emphasis is placed on hardware, software and communication protocols rather than need, methodology and application. This can result in over-automation with complex, expensive and ineffective systems, or under-automation that fails to achieve the user`s objectives. The objective is to select appropriate hardware, software and methodology to build the most cost effective system to get the desired results. This paper describes steps to ensure the successful implementation of substation automation.

Thomas, J. [General Electric, Malvern, PA (United States)

1996-10-01T23:59:59.000Z

367

Dynamic Whitelist Generation for Automated Response  

Broader source: Energy.gov (indexed) [DOE]

Methodology Methodology Results Dynamic Whitelist Generation for Automated Response Chris Strasburg, Josh Adams Ames Laboratory, US DOE cstras@ameslab.gov, jadams@ameslab.gov The Ames Laboratory, US DOE 1 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results Outline 1 Introduction About Ames Laboratory Motivation 2 Methodology Data Classifiers Experiments 3 Results The Ames Laboratory, US DOE 2 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames Laboratory Motivation Ames Physical Environment The Ames Laboratory, US DOE 3 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames Laboratory Motivation Ames Network Environment The Ames Laboratory, US DOE 4 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames

368

Definition: Deferred Distribution Capacity Investments | Open Energy  

Open Energy Info (EERE)

Deferred Distribution Capacity Investments Deferred Distribution Capacity Investments Jump to: navigation, search Dictionary.png Deferred Distribution Capacity Investments As with the transmission system, reducing the load and stress on distribution elements increases asset utilization and reduces the potential need for upgrades. Closer monitoring and load management on distribution feeders could potentially extend the time before upgrades or capacity additions are required.[1] Related Terms load, transmission lines, transmission line, sustainability References ↑ SmartGrid.gov 'Description of Benefits' An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Deferred_Distribution_Capacity_Investments&oldid=502613

369

AUTOMATING GROUNDWATER SAMPLING AT HANFORD  

SciTech Connect (OSTI)

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

CONNELL CW; HILDEBRAND RD; CONLEY SF; CUNNINGHAM DE

2009-01-16T23:59:59.000Z

370

Automated cleaning of electronic components  

SciTech Connect (OSTI)

Environmental and operator safety concerns are leading to the elimination of trichloroethylene and chlorofluorocarbon solvents in cleaning processes that remove rosin flux, organic and inorganic contamination, and particulates from electronic components. Present processes depend heavily on these solvents for manual spray cleaning of small components and subassemblies. Use of alternative solvent systems can lead to longer processing times and reduced quality. Automated spray cleaning can improve the quality of the cleaning process, thus enabling the productive use of environmentally conscious materials, while minimizing personnel exposure to hazardous materials. We describe the development of a prototype robotic system for cleaning electronic components in a spray cleaning workcell. An important feature of the prototype system is the capability to generate the robot paths and motions automatically from the CAD models of the part to be cleaned, and to embed cleaning process knowledge into the automatically programmed operations.

Drotning, W.; Meirans, L.; Wapman, W.; Hwang, Y.; Koenig, L.; Petterson, B.

1994-07-01T23:59:59.000Z

371

A SIP-based Home Automation Platform: an Experimental Study  

E-Print Network [OSTI]

A SIP-based Home Automation Platform: an Experimental Study Benjamin Bertran, Charles Consel INRIA the requirements of home automation; we present the resulting architecture of a home automation system; and, we to tackle the challenges of the home automation domain. In this paper we present an approach and a platform

Boyer, Edmond

372

Fueling Robot Automates Hydrogen Hose Reliability Testing (Fact Sheet)  

SciTech Connect (OSTI)

Automated robot mimics fueling action to test hydrogen hoses for durability in real-world conditions.

Harrison, K.

2014-01-01T23:59:59.000Z

373

Automated Data Quality Analysis Research and Development  

E-Print Network [OSTI]

DOCUMENTATION 4.0 FUTURE DIRECTIONS 5.0 SUMMARY 6.0 CODE 1 2 3 5 5 12 17 17 18 February 2002, Final Report Energy Systems Laboratory, Texas A&M University p. 5 1.0 INTRODUCTION The Automated Data Quality process development is an effort to automate the analysis.... Automation of the "lower-level" data quality checking will enabled a more refined review process. Figure 1. Energy Core Polling and Reloading Process Diagram February 2002, Final Report Energy Systems Laboratory, Texas A&M University p. 6 2.2 Definitions...

Sweeney, J., Jr.; Haberl, J. S.

2002-01-01T23:59:59.000Z

374

j5 DNA Assembly Design Automation Software  

Science Journals Connector (OSTI)

j5 DNA Assembly Design Automation Software ... Here, we report the development and deployment of a web-based software tool, j5, which automates the design of scar-less multipart DNA assembly protocols including SLIC, Gibson, CPEC, and Golden Gate. ... The key innovations of the j5 design process include cost optimization, leveraging DNA synthesis when cost-effective to do so, the enforcement of design specification rules, hierarchical assembly strategies to mitigate likely assembly errors, and the instruction of manual or automated construction of scar-less combinatorial DNA libraries. ...

Nathan J. Hillson; Rafael D. Rosengarten; Jay D. Keasling

2011-12-07T23:59:59.000Z

375

Modular design for increasing assembly automation  

Science Journals Connector (OSTI)

Abstract Modular design can address the need for a high number of product variants and further allow a higher degree of automation in the assembly line. A framework is developed for the simultaneous modular product design and the design of automated manufacturing system. Product designs are optimized for automation using Design Structure Matrix and Modular Function Deployment. Alternative production systems are designed and accessed based on the analysis of assembly steps hierarchically. The implementation of the framework on the design of a production system for furniture assembly, able to handle multiple variants with a large number of components, is demonstrated.

Konstantinos Salonitis

2014-01-01T23:59:59.000Z

376

AUTOMATION IN THE MEAT INDUSTRY | Slaughter Line Operation  

Science Journals Connector (OSTI)

Abstract The strongest incentives for the slaughter industry to adopt automation technology relate to the drive for improved productivity through reduced labor. Automation in the pig slaughter industry has mainly been adopted in regions with high labor costs such as Northern Europe. In New Zealand, the lamb slaughter industry has been progressive in developing and using automation to automate the slaughter process. Automation in beef slaughter is limited because of the complexity associated with handling of the biological variation. Barriers for slaughter line automation include the high cost and complexity associated with the development of slaughter automation technology, combined with limited market size.

J.U. Nielsen; N.T. Madsen; R. Clarke

2014-01-01T23:59:59.000Z

377

Declarative Automated Cloud Resource Orchestration  

E-Print Network [OSTI]

orchestration · Cloud resource orchestration constraint optimization problems 4 Provider operational] · Orchestration procedures Transactions · Either commit or abort Distributed communication and optimization

Plotkin, Joshua B.

378

Level of Automation Effects on Situation Awareness and Functional Specificity in Automation Reliance.  

E-Print Network [OSTI]

??This thesis investigates the relationships between performance, workload, and situation awareness at varying levels of automation. The relationships observed in this study are compared to… (more)

Smith, Adam

2012-01-01T23:59:59.000Z

379

LANL to certify automated influenza surveillance system  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LANL to certify automated influenza surveillance system LANL to certify automated influenza surveillance system LANL to certify automated influenza surveillance system A compact automated system for surveillance and screening of potential pandemic strains of influenza and other deadly infectious diseases is a step closer to reality. January 31, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

380

Automated visual inspection of rolled metal surfaces  

Science Journals Connector (OSTI)

A prototype for an automated visual on-line metal strip inspection system is described. The system is capable of both detecting and classifying surface defects in copper alloy strips, and it has been installed...

Timo Piironen; Olli Silven; Matti Pietikäinen…

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Automated intrusion recovery for web applications  

E-Print Network [OSTI]

In this dissertation, we develop recovery techniques for web applications and demonstrate that automated recovery from intrusions and user mistakes is practical as well as effective. Web applications play a critical role ...

Chandra, Ramesh, Ph. D. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

382

Preface: Cognitive Engineering in Automated Systems Design  

E-Print Network [OSTI]

Preface: Cognitive Engineering in Automated Systems Design This special issue was motivated by an apparent paucity of research on applications of cognitive engineering principles in the design of complex systems including mainte- nance, manufacturing, and transportation systems. Cognitive engineering

Kaber, David B.

383

Honeywell modular automation system computer software documentation  

SciTech Connect (OSTI)

This document provides a Computer Software Docuemntation for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This system will be used to control new thermal stabilization furnaces in HA-21I.

Cunningham, L.T.

1997-01-20T23:59:59.000Z

384

ZigBee Smart Home Automation Systems  

Science Journals Connector (OSTI)

This chapter summarizes a completed UK government funded project, the indeedNET ZigBee home automation system, which heralds a milestone in the ... energy saving devices with the potential to help home owners and...

Shuang-Hua Yang

2014-01-01T23:59:59.000Z

385

Graphic update of automated logic diagrams  

Science Journals Connector (OSTI)

The Automated Logic Diagram, or ALD, is a well defined document prepared by engineers to specify the design of a machine. 1 The document is coded for computer input by highly trained transcription personnel. Changes or corrections ...

Richard J. Uhlik

1968-07-01T23:59:59.000Z

386

Mirle Automation Corporation | Open Energy Information  

Open Energy Info (EERE)

Mirle Automation Corporation Mirle Automation Corporation Jump to: navigation, search Name Mirle Automation Corporation Place Hsinchu, Taiwan Zip 30077 Sector Solar Product A Taiwan-based automation system integrators and related product manufacturers who have entered thin film solar cell manufacturing equipment business. Coordinates 24.69389°, 121.148064° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":24.69389,"lon":121.148064,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

387

Design automation for microfluidics-based biochips  

Science Journals Connector (OSTI)

Advances in microfluidics technology offer exciting possibilities in the realm of enzymatic analysis, DNA analysis, proteomic analysis involving proteins and peptides, immunoassays, implantable drug delivery devices, and environmental toxicity monitoring. ... Keywords: Microfluidics, biochips, design automation

Krishnendu Chakrabarty; Jun Zeng

2005-10-01T23:59:59.000Z

388

Distributed Algorithms Distributed Transactions  

E-Print Network [OSTI]

Algorithms© Gero Mühl 8 Concurrency Control serial RC (ReCoverable) ACA (Avoiding Cascading Aborts) ST (StricDistributed Algorithms Distributed Transactions PD Dr.-Ing. Gero Mühl Kommunikations- und Betriebssysteme Fakultät für Elektrotechnik u. Informatik Technische Universität Berlin #12;Distributed Algorithms

Wichmann, Felix

389

Automating Logic Rectification by Approximate SPFDs  

Science Journals Connector (OSTI)

In the digital VLSI cycle, a netlist is often modified to correct design errors, perform small specification changes or implement incremental rewiring-based optimization operations. Most existing automated logic rectification tools use a small set of ... Keywords: SAT-based algorithm, approximate SPFD, digital VLSI cycle, design errors, incremental rewiring-based optimization operations, automated logic rectification tools, predefined logic transformations, memory/time explosion problem

Yu-Shen Yang; S. Sinha; A. Veneris; R. K. Brayton

2007-01-01T23:59:59.000Z

390

Proposed Fidelity Option Line-Up Tier Fund Type Fund Category/Asset Class Proposed Investment Option  

E-Print Network [OSTI]

Proposed Fidelity Option Line-Up Tier Fund Type Fund Category/Asset Class Proposed Investment Vanguard Inflation Protected Securities U.S. Large Cap Stock Index Fund Vanguard S&P 500 Index Fund U.S. Small/Mid Cap Stock Index Fund Vanguard Extended Market Index Fund International Stock Index Fund

391

A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities -Part 2: Prototype  

E-Print Network [OSTI]

faulty instrumentation in real- world oil production plants, as indicated in table I. In the simulation outflow valve F10 Faulty three-phase separator gas outflow valve TABLE I OIL PRODUCTION FACILITYA Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities

Taylor, James H.

392

Multi-Camera Handoff Management for Asset Monitoring in Nuclear Facilities C.-H Chen, A. Koschan, and M. Abidi  

E-Print Network [OSTI]

and the University Research Program in Robotics #12;METHODOLOGY Assume that the arrival of objects with a priorityMulti-Camera Handoff Management for Asset Monitoring in Nuclear Facilities C.-H Chen, A. Koschan Middle Drive, Knoxville, TN 37996 {cchen10, akoschan, and abidi}@utk.edu INTRODUCTION In a nuclear

Abidi, Mongi A.

393

Analysis of Open Automated Demand Response Deployments in California and Guidelines to Transition to Industry Standards  

E-Print Network [OSTI]

to  Automated  Demand   Response  and  the  OpenADR  ®  Automated  Demand  Response  Program.   https://Data  for  Automated  Demand  Response  in  Commercial  

Ghatikar, Girish

2014-01-01T23:59:59.000Z

394

Open Automated Demand Response Technologies for Dynamic Pricing and Smart Grid  

E-Print Network [OSTI]

for Automated Demand Response in Commercial Buildings. ” In2010. “Open Automated Demand Response Dynamic Pricing2009. “Open Automated Demand Response Communications

Ghatikar, Girish

2010-01-01T23:59:59.000Z

395

Explorations of Space-Charge Limits in Parallel-Plate Diodes and Associated Techniques for Automation  

E-Print Network [OSTI]

and Associated Techniques for Automation by Benjamin Ragan-and Associated Techniques for Automation Copyright 2013 byand Associated Techniques for Automation by Benjamin Ragan-

Ragan-Kelley, Benjamin

2013-01-01T23:59:59.000Z

396

Demonstration of Datacenter Automation Software and Hardware (DASH) at the California Franchise Tax Board  

E-Print Network [OSTI]

of Datacenter Automation Software and Hardware (DASH) at theof Datacenter Automation Software and Hardware (DASH) at theprotocol for building automation and control networks. It is

Bell, Geoffrey C.

2010-01-01T23:59:59.000Z

397

Automation for on-line remote-control in-situ electron microscopy  

E-Print Network [OSTI]

Pfefferkorn Conference (1996) Automation for On-Line Remote-Pfefferkorn Conference (1996) Automation for On-Line Remote-by incorporating local automation of stage control and

1996-01-01T23:59:59.000Z

398

Automated Demand Response Technologies and Demonstration in New York City using OpenADR  

E-Print Network [OSTI]

EMCS Vendor and Product Automated Logic Control RemoteBuildings Integrator, Automated Logic Corporation’s WebCTRLIntegrator (EBI), Automated Logic Corporation’s WebCTRL® ,

Kim, Joyce Jihyun

2014-01-01T23:59:59.000Z

399

Bad money and distributive conflict: is stagflation coming back after the great depression?  

E-Print Network [OSTI]

1 Bad money and distributive conflict: is stagflation coming back after the great depression? Angel is that bad money has been (endogenously) delivered which did not lead to a proportionate increase of real to limit the artificial increase of assets prices, the circulating bad money may trigger a generalized

Paris-Sud XI, Université de

400

Automated diagnostics scoping study. Final report  

SciTech Connect (OSTI)

The objective of the Automated Diagnostics Scoping Study was to investigate the needs for diagnostics in building operation and to examine some of the current technologies in automated diagnostics that can address these needs. The study was conducted in two parts. In the needs analysis, the authors interviewed facility managers and engineers at five building sites. In the technology survey, they collected published information on automated diagnostic technologies in commercial and military applications as well as on technologies currently under research. The following describe key areas that the authors identify for the research, development, and deployment of automated diagnostic technologies: tools and techniques to aid diagnosis during building commissioning, especially those that address issues arising from integrating building systems and diagnosing multiple simultaneous faults; technologies to aid diagnosis for systems and components that are unmonitored or unalarmed; automated capabilities to assist cause-and-effect exploration during diagnosis; inexpensive, reliable sensors, especially those that expand the current range of sensory input; technologies that aid predictive diagnosis through trend analysis; integration of simulation and optimization tools with building automation systems to optimize control strategies and energy performance; integration of diagnostic, control, and preventive maintenance technologies. By relating existing technologies to perceived and actual needs, the authors reached some conclusions about the opportunities for automated diagnostics in building operation. Some of a building operator`s needs can be satisfied by off-the-shelf hardware and software. Other needs are not so easily satisfied, suggesting directions for future research. Their conclusions and suggestions are offered in the final section of this study.

Quadrel, R.W.; Lash, T.A.

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

ISA Approves Standard for Wireless Automation in Process Control  

Broader source: Energy.gov (indexed) [DOE]

ISA Approves Standard for Wireless Automation in Process Control ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. ISA Approves Standard for Wireless Automation in Process Control Applications More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Control Systems Security Standards: Accomplishments And Impacts

402

Automated Monitoring System for Waste Disposal Sites and Groundwater  

SciTech Connect (OSTI)

A proposal submitted to the U.S. Department of Energy (DOE), Office of Science and Technology, Accelerated Site Technology Deployment (ASTD) program to deploy an automated monitoring system for waste disposal sites and groundwater, herein referred to as the ''Automated Monitoring System,'' was funded in fiscal year (FY) 2002. This two-year project included three parts: (1) deployment of cellular telephone modems on existing dataloggers, (2) development of a data management system, and (3) development of Internet accessibility. The proposed concept was initially (in FY 2002) to deploy cellular telephone modems on existing dataloggers and partially develop the data management system at the Nevada Test Site (NTS). This initial effort included both Bechtel Nevada (BN) and the Desert Research Institute (DRI). The following year (FY 2003), cellular modems were to be similarly deployed at Sandia National Laboratories (SNL) and Los Alamos National Laboratory (LANL), and the early data management system developed at the NTS was to be brought to those locations for site-specific development and use. Also in FY 2003, additional site-specific development of the complete system was to be conducted at the NTS. To complete the project, certain data, depending on site-specific conditions or restrictions involving distribution of data, were to made available through the Internet via the DRI/Western Region Climate Center (WRCC) WEABASE platform. If the complete project had been implemented, the system schematic would have looked like the figure on the following page.

S. E. Rawlinson

2003-03-01T23:59:59.000Z

403

n-Tiered Test Automation Architecture for Agile Software Systems  

Science Journals Connector (OSTI)

Abstract This paper introduces a multi-tiered test automation architecture to optimize test automation in an Agile software development environment while increasing both the test coverage and depth of each tier. Test Automation is the act of converting manual test cases into automated scripts that can be executed autonomously. In general, testing accounts for roughly 60% of the overall development budget and approximately 50% of that is attributed to regression testing. In recent years software organizations have begun migrating to Agile software development practices and automated testing in hopes of reducing the cost, lengthy regression cycles, and time to market. Traditionally, test automation is conducted on stable, non-changing applications. In an Agile environment where the code constantly changes, automated test cases become obsolete and must constantly be refactored in order to provide meaningful feedback about the system's quality. In most instances the cost of maintenance of automated test code completely overshadows the entire automation effort and negates any possible Return on Investment (RoI). An n-Tiered Test Automation Architecture seeks to retain the RoI by abstracting the automation project into separate distinct tiers; Presentation, Business, Data, and Services. These abstractions allow automated testing to continue providing feedback despite the constant revision of the system. A case study was conducted using this method and the observations showed that the automation architecture was resilient to change while increasing the test coverage, the depth of testing, and the overall quality of the application under test.

Patrick Day

2014-01-01T23:59:59.000Z

404

Field Testing of Automated Demand Response for Integration of Renewable Resources in California's Ancillary Services Market for Regulation Products  

E-Print Network [OSTI]

Controls ° Larry Bacher, Automated Logic Corporation ° Louiscontrolled from a central Automated Logic Corporation energy

Kiliccote, Sila

2013-01-01T23:59:59.000Z

405

AIS Automation Dresden | Open Energy Information  

Open Energy Info (EERE)

AIS Automation Dresden AIS Automation Dresden Jump to: navigation, search Name AIS Automation Dresden Place Dresden, Germany Zip D-01237 Product Provides software for industrial process control for the semiconductor and photovoltaic industries. Coordinates 51.053645°, 13.740815° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.053645,"lon":13.740815,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

406

Analysis of Open Automated Demand Response Deployments in California  

E-Print Network [OSTI]

LBNL-6560E Analysis of Open Automated Demand Response Deployments in California and Guidelines The work described in this report was coordinated by the Demand Response Research. #12; #12;Abstract This report reviews the Open Automated Demand Response

407

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network [OSTI]

4 9 . Piette et at Automated Demand Response Strategies andDynamic Controls for Demand Response in New and ExistingFully Automated Demand Response Tests in Large Facilities"

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

408

A framework for interactive end-user web automation.  

E-Print Network [OSTI]

??This research investigates the feasibility and usefulness of a Web-based model for end-user Web automation. The aim is to empower end users to automate their… (more)

Eliwa, Essam

2013-01-01T23:59:59.000Z

409

Department of Mechanical Engineering Spring 2011 Nanoparticle Reactor Automation  

E-Print Network [OSTI]

PENNSTATE Department of Mechanical Engineering Spring 2011 Nanoparticle Reactor Automation Overview would be fully automated and able to run overnight. The team was also asked to keep the solutions from

Demirel, Melik C.

410

Automating Logic Rectification by Approximate SPFDs Yu-Shen Yang  

E-Print Network [OSTI]

Automating Logic Rectification by Approximate SPFDs Yu-Shen Yang Dept. of ECE University of Toronto changes or implement incremental rewiring-based optimization operations. Most existing automated logic

Veneris, Andreas

411

Control Software for Home Automation, Design Aspects and Position Paper Keywords: Autohan, UPnP, Iota, XML.  

E-Print Network [OSTI]

Control Software for Home Automation, Design Aspects and Position Paper D. Greaves Abstract Keywords: Autohan, UPnP, Iota, XML. The home is an eternal, heterogeneous, distributed com- puting environment which must be secure and reliable. Computers and embedded processors in the home are all different

Greaves, David J.

412

Automated Store Management For Drum Storage Facility  

SciTech Connect (OSTI)

This paper describes advanced system technology developed for a new Drum Storage Facility to be operated by Taiwan Power Company (TPC). A logistics management concept is applied for the storage of solid rad-wastes in terms of automated handling, transportation and storing as well as in terms of data management. The individual equipments, such as automated Bridge Cranes, Automatic Guided Vehicles and auxiliary systems are introduced in this paper and the store management process is outlined. The authors report furthermore on challenges during the design and engineering phase and review the project implementation from the equipment supplier's end. (authors)

Koller, W.; Lang, R. [Siempelkamp Nukleartechnik GmbH, Krefeld (Germany)

2008-07-01T23:59:59.000Z

413

Beyond Commissioning: The Role of Automation  

SciTech Connect (OSTI)

This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2005-02-01T23:59:59.000Z

414

Automated generation of lattice QCD Feynman rules  

E-Print Network [OSTI]

The derivation of the Feynman rules for lattice perturbation theory from actions and operators is complicated, especially for highly improved actions such as HISQ. This task is, however, both important and particularly suitable for automation. We describe a suite of software to generate and evaluate Feynman rules for a wide range of lattice field theories with gluons and (relativistic and/or heavy) quarks. Our programs are capable of dealing with actions as complicated as (m)NRQCD and HISQ. Automated differentiation methods are used to calculate also the derivatives of Feynman diagrams.

A. Hart; G. M. von Hippel; R. R. Horgan; E. H. Müller

2009-04-02T23:59:59.000Z

415

Northwest Open Automated Demand Response Technology Demonstration Project  

E-Print Network [OSTI]

Report 2009. Open Automated Demand Response Communicationsand Techniques for Demand Response. California Energyand S. Kiliccote. Estimating Demand Response Load Impacts:

Kiliccote, Sila

2010-01-01T23:59:59.000Z

416

DOE Commercial Building Energy Asset Score: Software Development for Phase II Building Types  

Broader source: Energy.gov (indexed) [DOE]

To estim assumpt to unders tables pr These ta but a bui even by s the Asse year, dep in the ap To get an tables. F Operat Schedu School Office Retail Warehou Hotel Apartme Courthou Library 1 Operatio Standard 9 are added be modifie 2 Closing ti purposes. DOE C Softwar Oper ate a buildin ions concern stand how w rovide a simp bles reflect t lding's level season in ca et Scoring To pending on e pendix at the n overall ide or a more gr tional As ules of Op Occu Sche (hrs 41 48 46 use 1 nt 1 use 4 4 nal assumption 90.1 Prototype to the Asset Sc ed to better ref mes reflect tho Commer re Devel rational a ng's energy u ning how the well these as plified list of the full-time of operation ases such as ool applies a each building e end of this a of the ass ranular unde sumption peration upancy

417

ALL SHADED FIELDS ARE REQUIRED U.S. Department of Energy Commercial Building Energy Asset Score 2013 Pilot  

Broader source: Energy.gov (indexed) [DOE]

ALL SHADED FIELDS ARE REQUIRED ALL SHADED FIELDS ARE REQUIRED U.S. Department of Energy Commercial Building Energy Asset Score 2013 Pilot Data Collection Form Version: 6/14/2013 Building Name: Data collected by: Email, phone: Date of Data Collection: HOW TO USE THIS DATA COLLECTION FORM This form is intended to facilitate your data collection. The Energy Asset Scoring Tool uses the "block" concept to simplify your building geometry. Most buildings can be scored as one block un- less at least one of the follow situations applies: a. The building has sections with different numbers of floors Example: A portion of the building is 3 story and the other portion is 10 story. b. Different parts of the building are served by different HVAC systems Example: A portion of the building uses a local chiller, the other portion uses packaged DX

418

How to Make Ad Hoc Proof Automation Less Ad Hoc  

E-Print Network [OSTI]

How to Make Ad Hoc Proof Automation Less Ad Hoc Georges Gonthier1 Beta Ziliani2 Aleks Nanevski3 Software Institute, Madrid ICFP 2011, Tokyo #12;Why proof automation at ICFP? Ad hoc polymorphism Overloading terms Ad hoc proof automation Overloading lemmas "How to make ad hoc polymorphism less ad hoc

Dreyer, Derek

419

Techniques for Securing Substation Automation Systems David Guidry1  

E-Print Network [OSTI]

Techniques for Securing Substation Automation Systems David Guidry1 , Mike Burmester1 , Xiuwen Liu1 propose techniques for resilient substation automation of power utility systems with security based-90-5 compliant substation automation systems that are resilient. We demonstrate the feasibility of our approach

Burmester, Mike

420

Automated FMEA based diagnostic symptom generation. Neal Snooke1,  

E-Print Network [OSTI]

Automated FMEA based diagnostic symptom generation. Neal Snooke1, , Chris Price Department the model based simulation used to produce an automated Failure Modes and Effect Analysis (FMEA to automate the production of a FMEA report, and the paper also considers the relationship between FMEA

Snooke, Neal

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Home Automation in the Wild: Challenges and Opportunities  

E-Print Network [OSTI]

Home Automation in the Wild: Challenges and Opportunities A.J. Bernheim Brush, Bongshin Lee, Ratul enabling home automation. However, these technologies have not been widely adopted despite being available visits to 14 households with home automation. The long term experience, both positive and negative

Rajamani, Sriram K.

422

A Component Framework for Telecare and Home Automation  

E-Print Network [OSTI]

A Component Framework for Telecare and Home Automation Claire Maternaghan and Kenneth J. Turner-the-shelf and novel components. Keywords ­ Component Framework, Home Automation, Service-Oriented Architecture required. Home automation allows users to interact with their home as a whole, and to have flexible control

Hammerton, James

423

Improving Home Automation by Discovering Regularly Occurring Device Usage Patterns  

E-Print Network [OSTI]

Improving Home Automation by Discovering Regularly Occurring Device Usage Patterns Edwin O of two prediction algorithms, thus demonstrating multiple uses for a home automation system. Finally, we Several research efforts are focused on home automation. The Intelligent Room [2] uses an array of sensors

Cook, Diane J.

424

Remote-Controlled Home Automation Systems with Different Network Technologies  

E-Print Network [OSTI]

Remote-Controlled Home Automation Systems with Different Network Technologies Armando Roy Delgado into the potential for remote controlled operation of home automation systems. It considers problems, 2002) which certainly requires a careful study before developing any suitable Home Automation System

Grout, Vic

425

Automation strategies: existing theory or ad hoc decisions?  

Science Journals Connector (OSTI)

Automating manufacturing systems potentially improves competitiveness. Empirical studies show that the most successful result is achieved when decisions concerning automation are linked to the manufacturing strategies and competitive priorities of the company. It is suggested that automation is regarded as a separate decision group, within the manufacturing strategy content field.

Mats Winroth; Kristina Safsten; Johan Stahre

2007-01-01T23:59:59.000Z

426

Density Functional Theory-Based Database Development and CALPHAD Automation  

E-Print Network [OSTI]

Density Functional Theory-Based Database Development and CALPHAD Automation YI WANG,1,2 SHUNLI, the integration of first-principles calculations, CALPHAD modeling, and the automation of phase diagram, and the automated calculation of a phase diagram for the Al- Mg system. INTRODUCTION In thermodynamics, a phase

Chen, Long-Qing

427

Security Automation Developer Days March 22-25, 2011  

E-Print Network [OSTI]

Security Automation Developer Days March 22-25, 2011 Portrait Room The National Institute Reporting Format (ARF) efforts. 1:00 ­ 2:50 Adv. Tailoring and Automated Profile Selection Charles Schmidt tailoring procedures, and structures that could support automated selection of profiles. This discussion

Magee, Joseph W.

428

The Automation of Sound Reasoning and Successful Proof Finding  

E-Print Network [OSTI]

709 44 The Automation of Sound Reasoning and Successful Proof Finding LARRY WOS AND BRANDEN scientist naturally envisioned the automation of sound rea- soning ­ reasoning in which conclusions, and find proofs. But can such logical reasoning be fully automated? Can a single computer program

Fitelson, Branden

429

http://jla.sagepub.com/ Journal of Laboratory Automation  

E-Print Network [OSTI]

http://jla.sagepub.com/ Journal of Laboratory Automation http://jla.sagepub.com/content/early/2012 2012Journal of Laboratory Automation Timothy J. Bunning and Tony Jun Huang Yan Jun Liu, Mengqian Lu://www.sagepublications.com On behalf of: Society for Laboratory Automation and Screening can be found at:Journal of Laboratory

Demirel, Melik C.

430

IT/Automation Cost Reduction in Intel's Manufacturing Environment  

E-Print Network [OSTI]

IT/Automation Cost Reduction in Intel's Manufacturing Environment Brian Subirana subirana@mit.edu MIT Center for Coordination Science WP #222 July 2003 #12;IT/Automation Cost Reduction in Intel maintaining existing service levels. "We want you to reduce automation costs by 50% while maintaining equal

431

Control, automation and the hot rolling of steel  

Science Journals Connector (OSTI)

...Shercliff and M. J. Stowell Control, automation and the hot rolling of steel P.J...Rugby CV21 1BU, UK The current state of automation and control for hot rolling mills...mills|rolling mill models| Control, automation and the hot rolling of steel By P...

1999-01-01T23:59:59.000Z

432

AUTOMATED LOGIC SYNTHESIS OF RANDOM PATTERN TESTABLE CIRCUITS  

E-Print Network [OSTI]

AUTOMATED LOGIC SYNTHESIS OF RANDOM PATTERN TESTABLE CIRCUITS Nur A. Touba and Edward J. Mc during logic synthesis. An automated logic synthesis procedure is described which takes as an input a two. The approach taken in this paper is to consider random pattern testability during logic synthesis. An automated

Touba, Nur A.

433

Analysis of pooling, equity capital and current assets of large producer marketing cooperatives with implications for export marketing  

E-Print Network [OSTI]

unfair treatment of' some members. Another advan- tage cited is that pooling reduces member income risks. Pooling is attractive to producers because it passes the marketing function to the cooperative staff. A specific disadvantage is that certain pool...ANALYSIS OF POOLING, EQUITY CAPITAL AND CURRENT ASSETS OF LARGE PRODUCER MARKETING COOPERATIVES WITH IMPLICATIONS FOR EXPORT MARKETING A Thesis by CYNTHIA HEATHER TOUGH Submitted to the Graduate College of Texas ASM University in partial...

Tough, Cynthia H

2012-06-07T23:59:59.000Z

434

A tiered modelling approach for condition based maintenance of industrial assets with load sharing interaction and fault propagation  

E-Print Network [OSTI]

of one or more of the critical components, thus causing the asset to deteriorate faster than the normal rate. For instance, stay cables are some of the most important elements in span bridge. It consists of multiple parallel wires (critical components... need from the lower layer. Using this information, the optimal maintenance and inspection strategies can be found directly using equation (1) and (2). 4. Conclusion Motivated by industrial cases such as maintenance of stay cables, we propose a 2-tiered...

Liang, Zhenglin; Parlikad, Ajith Kumar

2014-05-24T23:59:59.000Z

435

Salsbury and Diamond: Automated Testing of HVAC Systems for Commissioning -1 -Automated Testing of HVAC Systems for Commissioning  

E-Print Network [OSTI]

and Diamond: Automated Testing of HVAC Systems for Commissioning - 1 - Automated Testing of HVAC Systems This paper describes an approach to the automation of the commissioning of HVAC systems. The approach of many HVAC systems is limited more by poor installation, commissioning, and maintenance than by poor

436

Continuous operation of a one-way quantum key distribution system over installed telecom fibre  

Science Journals Connector (OSTI)

We demonstrate a robust, compact and automated quantum key distribution system, based upon a one-way Mach-Zender interferometer, which is actively compensated for temporal drifts in...

Yuan, Zhiliang; Shields, A

2005-01-01T23:59:59.000Z

437

A Semi-Infinite Programming Approach for Distributionally Robust ...  

E-Print Network [OSTI]

Jan 26, 2015 ... historical data set of 10 assets (Aberdeen Asset Management plc, Admiral ... Group PLC, BAE Systems PLC and Barclays PL) over a time ...

2015-01-26T23:59:59.000Z

438

Automated Architectural Exploration for Signal Processing Algorithms  

E-Print Network [OSTI]

Automated Architectural Exploration for Signal Processing Algorithms Ramsey Hourani, Ravi Jenkal, W processing algorithms. The goal of our framework is to improve hardware architectural exploration by guiding Property (IP) cores for system level signal processing algorithms. We present our view of a framework

Davis, Rhett

439

Automated Fuel Dispensing System Form Instructions  

E-Print Network [OSTI]

Automated Fuel Dispensing System Form Instructions If additional forms are necessary to provide(s) are hired and will be obtaining fuel, an Add Driver Form MUST be submitted for entry into the web database and/or diesel fuel to operate. Note: When a new vehicle, golf cart (gasoline), etc., is placed

Fernandez, Eduardo

440

Automated structure solution with the PHENIX suite  

SciTech Connect (OSTI)

Significant time and effort are often required to solve and complete a macromolecular crystal structure. The development of automated computational methods for the analysis, solution, and completion of crystallographic structures has the potential to produce minimally biased models in a short time without the need for manual intervention. The PHENIX software suite is a highly automated system for macromolecular structure determination that can rapidly arrive at an initial partial model of a structure without significant human intervention, given moderate resolution, and good quality data. This achievement has been made possible by the development of new algorithms for structure determination, maximum-likelihood molecular replacement (PHASER), heavy-atom search (HySS), template- and pattern-based automated model-building (RESOLVE, TEXTAL), automated macromolecular refinement (phenix. refine), and iterative model-building, density modification and refinement that can operate at moderate resolution (RESOLVE, AutoBuild). These algorithms are based on a highly integrated and comprehensive set of crystallographic libraries that have been built and made available to the community. The algorithms are tightly linked and made easily accessible to users through the PHENIX Wizards and the PHENIX GUI.

Terwilliger, Thomas C [Los Alamos National Laboratory; Zwart, Peter H [LBNL; Afonine, Pavel V [LBNL; Grosse - Kunstleve, Ralf W [LBNL

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Automated Structure Solution with the PHENIX Suite  

SciTech Connect (OSTI)

Significant time and effort are often required to solve and complete a macromolecular crystal structure. The development of automated computational methods for the analysis, solution and completion of crystallographic structures has the potential to produce minimally biased models in a short time without the need for manual intervention. The PHENIX software suite is a highly automated system for macromolecular structure determination that can rapidly arrive at an initial partial model of a structure without significant human intervention, given moderate resolution and good quality data. This achievement has been made possible by the development of new algorithms for structure determination, maximum-likelihood molecular replacement (PHASER), heavy-atom search (HySS), template and pattern-based automated model-building (RESOLVE, TEXTAL), automated macromolecular refinement (phenix.refine), and iterative model-building, density modification and refinement that can operate at moderate resolution (RESOLVE, AutoBuild). These algorithms are based on a highly integrated and comprehensive set of crystallographic libraries that have been built and made available to the community. The algorithms are tightly linked and made easily accessible to users through the PHENIX Wizards and the PHENIX GUI.

Zwart, Peter H.; Zwart, Peter H.; Afonine, Pavel; Grosse-Kunstleve, Ralf W.; Hung, Li-Wei; Ioerger, Tom R.; McCoy, A.J.; McKee, Eric; Moriarty, Nigel; Read, Randy J.; Sacchettini, James C.; Sauter, Nicholas K.; Storoni, L.C.; Terwilliger, Tomas C.; Adams, Paul D.

2008-06-09T23:59:59.000Z

442

Viability of Modern Automated Rapid Transit Applications  

E-Print Network [OSTI]

guideway: elevated, underground, at grade · Fully automated: electric-powered, electronic controls · Non · Headways/frequency: about 30 seconds/120 veh/hr · Small vehicles: 4-6 passengers, low weight · Eco: 4 km, 21 vehicles, two stations (parking and terminal) · Open to public service Spring 2011, 22

Minnesota, University of

443

Honeywell Modular Automation System Computer Software Documentation  

SciTech Connect (OSTI)

This document provides a Computer Software Documentation for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This system will be used to control new thermal stabilization furnaces in HA-211 and vertical denitration calciner in HC-230C-2.

CUNNINGHAM, L.T.

1999-09-27T23:59:59.000Z

444

AUTOMATED PLANNING FOR HYDROTHERMAL VENT PROSPECTING USING  

E-Print Network [OSTI]

AUTOMATED PLANNING FOR HYDROTHERMAL VENT PROSPECTING USING AUVS by ZEYN A SAIGOL A thesis submitted of searching the ocean floor for hydrothermal vents, using autonomous underwater vehicles (AUVs process (POMDP), but with a very large state space (of the order of 10123 states). This size of problem

Yao, Xin

445

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Inquiry Page March 2011 #12;ECR Transaction Inquiry To view a transaction that is in process or already completed, follow the menu navigation below: Home > Employee Change Home > Employee Change Request (ECR) > Inquire > ECR Inquire 5 #12;6 · The Originator is the only one

Huang, Jianyu

446

Review article Automated monitoring of greenhouse crops  

E-Print Network [OSTI]

of the greenhouse. Most of these sensors, such as thermistors and light meters, are reli- able, inexpensive, readilyReview article Automated monitoring of greenhouse crops David L. EHRETa*, Anthony LAUb, Shabtai and continuously detect crop stress, water use, growth and nutrition in greenhouse crops. Some of these techniques

Boyer, Edmond

447

Classified Automated Information System Security Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish uniform requirements, policies, responsibilities, and procedures for the development and implementation of a Department of Energy (DOE) Classified Computer Security Program to ensure the security of classified information in automated data processing (ADP) systems. Cancels DOE O 5637.1. Canceled by DOE O 471.2.

1994-07-15T23:59:59.000Z

448

Safe controllers design for industrial automation systems  

Science Journals Connector (OSTI)

The design of safe industrial controllers is one of the most important domains related to Automation Systems research. To support it, synthesis and analysis techniques are available. Among the analysis techniques, two of the most important are Simulation ... Keywords: Formal verification, Industrial systems behaviour modelling, Real-time systems, Safe controllers, Simulation

José Machado; Eurico Seabra; José C. Campos; Filomena Soares; Celina P. Leão

2011-05-01T23:59:59.000Z

449

Sabbath Day Home Automation: "It's Like Mixing Technology and Religion"  

E-Print Network [OSTI]

We present a qualitative study of 20 American Orthodox Jewish families' use of home automation for religious purposes. These lead users offer insight into real-life, long-term experience with home automation technologies. We discuss how automation was seen by participants to contribute to spiritual experience and how participants oriented to the use of automation as a religious custom. We also discuss the relationship of home automation to family life. We draw design implications for the broader population, including surrender of control as a design resource, home technologies that support long-term goals and lifestyle choices, and respite from technology.

Woodruff, Allison; Foucault, Brooke

2007-01-01T23:59:59.000Z

450

Direct Reduction of Waste through Refining of DOE Metal Assets - 13632  

SciTech Connect (OSTI)

CVMR{sup R} presents a technology for refining nickel from the enrichment barrier materials of the DOE that is proven through 100 years of use by the metals industry. CVMR{sup R} applies modern controls, instrumentation for process and monitoring of the system, and innovative production methods to produce a wide spectrum of products that generate new technology applications and improvements to our society and economy. CVMR{sup R} will receive barrier materials as a secure operation and size reduce the metal to a shred that is fed to a carbonylation reactor where nickel is reacted with carbon monoxide and generate nickel carbonyl. The carbonyl will be filtered and decomposed with heat to form a variety of products that include high value nano powders, coated substrates, net shapes and pure nickel. The residue from the reactor will retain radionuclides from enrichment activities. The carbon monoxide will only react and extract nickel under the operating conditions to leave volumetric contamination in the unreacted residue. A demonstration plant was designed and built by CVMR{sup R} and operated by BWXT, to demonstrate the systems capabilities to DOE in 2006. A pilot plant operation precedes the detailed design of the nickel refinery and provides essential data for design, safe work practices, waste characterizations and system kinetics and confirms the project feasibility. CVMR{sup R} produces nickel products that are cleaner than the nickel in U.S. commerce and used by industry today. The CVMR{sup R} process and systems for nickel refining is well suited for DOE materials and will provide value through environmental stewardship, recovery of high value assets, and support of the DOE environmental remediation programs as the refined nickel generates additional long term benefits to local communities. (authors)

Hargett, Michael C.; Terekhov, Dimitri; Khozan, Kamran M. [Chemical Vapour Metal Refining - CVMR (United States)] [Chemical Vapour Metal Refining - CVMR (United States)

2013-07-01T23:59:59.000Z

451

Electricity Distribution Systems: How Information Will Lead the Transformation  

Broader source: Energy.gov (indexed) [DOE]

IBM IBM Electricity Distribution Systems How information will lead the transformation Allan Schurr VP Energy and Utilities 24 September 2012 Corporation Challenges facing the energy grid New entrants and disruptive technologies environmental concerns Increased pressure on Climate change and Aging asset performance operational efficiency with increased expectations and workforce on reliability productivity Increasing desire by consumers for a role in energy management and Growth in renewable generation and distributed resources conservation © 2012 IBM Corporation 2 Other transformed industries have lessons for the power grid Common Themes * Technology innovation * Disruptive new entrants * New business models Benefits for the consumer © 2012 IBM Corporation

452

Automated design of hierarchical intranets  

Science Journals Connector (OSTI)

This paper describes the use of i-CAD, a prototype tool for automatically synthesizing application specific intranets. i-CAD is a novel intranet computer-aided design software tool, and its ultimate goal is to concurrently design hierarchical network topologies and data management (content distribution) systems for data-intensive multimedia intranets. The prototype software tool introduced here synthesizes a three-level intranet architecture that entails minimal installation cost and yet enables all an intranet's clients to perform their tasks with acceptable performance. The tool chooses network technologies (hardware resources and protocols) based on requirements specified by the user and determines the topology. An evolutionary approach is used to search the design space for a minimal cost three-level network. The experimental results for several network design problems described here indicate the effectiveness of the prototype network tool in finding good designs from a large design space in a reasonable amount of time.

Sami J. Habib; Alice C. Parker; Daniel C. Lee

2002-01-01T23:59:59.000Z

453

A Mobile Automated Tomographic Gamma Scanning System - 13231  

SciTech Connect (OSTI)

Canberra Industries have recently designed and built a new automated Tomographic Gamma Scanning (TGS) system for mobile deployment. The TGS technique combines high-resolution gamma spectroscopy with low spatial resolution 3-dimensional image reconstruction to provide increased accuracy over traditional approaches for the assay of non-uniform source distributions in low-to medium-density, non-heterogeneous matrices. Originally pioneered by R. Estep at Los Alamos National Laboratory (LANL), the TGS method has been further developed and commercialized by Canberra Industries in recent years. The present system advances the state of the art on several fronts: it is designed to be housed in a standard cargo transport container for ease of transport, allowing waste characterization at multiple facilities under the purview of a single operator. Conveyor feed, drum rotator, and detector and collimator positioning mechanisms operated by programmable logic control (PLC) allow automated batch mode operation. The variable geometry settings can accommodate a wide range of waste packaging, including but not limited to standard 220 liter drums, 380 liter overpack drums, and smaller 20 liter cans. A 20 mCi Eu-152 transmission source provides attenuation corrections for drum matrices up to 1 g/cm{sup 3} in TGS mode; the system can be operated in Segmented Gamma Scanning (SGS) mode to measure higher density drums. To support TGS assays at higher densities, the source shield is sufficient to house an alternate Co-60 transmission source of higher activity, up to 250 mCi. An automated shutter and attenuator assembly is provided for operating the system with a dual intensity transmission source. The system's 1500 kg capacity rotator turntable can handle heavy containers such as concrete lined 380 liter overpack drums. Finally, data acquisition utilizes Canberra's Broad Energy Germanium (BEGE) detector and Lynx MCA, with 32 k channels, providing better than 0.1 keV/channel resolution to support both isotopic analysis with the MGA/MGAU software and a wide 3 MeV dynamic range. The calibration and verification of the system is discussed, and quantitative results are presented for a variety of drum types and matrices. (authors)

Kirkpatrick, J.M.; LeBlanc, P.J.; Nakazawa, D.; Petroka, D.L.; Kane Smith, S.; Venkataraman, R.; Villani, M. [Canberra Industries, Inc. 800 Research Parkway, Meriden CT 06450 (United States)] [Canberra Industries, Inc. 800 Research Parkway, Meriden CT 06450 (United States)

2013-07-01T23:59:59.000Z

454

home automation | OpenEI Community  

Open Energy Info (EERE)

91 91 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142285591 Varnish cache server home automation Home Graham7781's picture Submitted by Graham7781(2002) Super contributor 23 January, 2013 - 13:57 The Consumer Electronics Show round-up CES electronics home automation Las Vegas OpenEI Smart Grid Every January, Las Vegas hosts the Consumer Electronics Show. The CES is the world's largest technology-related trade show. The highlights of this year's show were OLED TVs, ultra-thin laptops,

455

Automating the development of EBS messages  

SciTech Connect (OSTI)

The State of New Hampshire (NH) had consistently received ARCAs for EBS messages over the years. Unfortunately, NH received a deficiency for information content of an Emergency Broadcast System (EBS) message during the 1993 Vermont Yankee exercise. The easy answer was to conduct training and pass the remedial. However, that would not have solved the problem of too much information to tailor in too little time. NH isn`t the only one with this problem, as evidenced by the 34 deficiencies due to incomplete, inaccurate or late EBS messages from 1991-1993 (1994 data not available at the time this paper was written.) EBS messages account for 46% of all deficiencies according to FEMA. Automation was the real solution. This paper details the development of a computer model that automates the development of EBS messages.

O`Hare, M.J. [Earth Tech., Alexandria, VA (United States); DeLucca, D.

1995-12-31T23:59:59.000Z

456

Automated diagnostic kiosk for diagnosing diseases  

DOE Patents [OSTI]

An automated and autonomous diagnostic apparatus that is capable of dispensing collection vials and collections kits to users interesting in collecting a biological sample and submitting their collected sample contained within a collection vial into the apparatus for automated diagnostic services. The user communicates with the apparatus through a touch-screen monitor. A user is able to enter personnel information into the apparatus including medical history, insurance information, co-payment, and answer a series of questions regarding their illness, which is used to determine the assay most likely to yield a positive result. Remotely-located physicians can communicate with users of the apparatus using video tele-medicine and request specific assays to be performed. The apparatus archives submitted samples for additional testing. Users may receive their assay results electronically. Users may allow the uploading of their diagnoses into a central databank for disease surveillance purposes.

Regan, John Frederick; Birch, James Michael

2014-02-11T23:59:59.000Z

457

Flow through electrode with automated calibration  

DOE Patents [OSTI]

The present invention is an improved automated flow through electrode liquid monitoring system. The automated system has a sample inlet to a sample pump, a sample outlet from the sample pump to at least one flow through electrode with a waste port. At least one computer controls the sample pump and records data from the at least one flow through electrode for a liquid sample. The improvement relies upon (a) at least one source of a calibration sample connected to (b) an injection valve connected to said sample outlet and connected to said source, said injection valve further connected to said at least one flow through electrode, wherein said injection valve is controlled by said computer to select between said liquid sample or said calibration sample. Advantages include improved accuracy because of more frequent calibrations, no additional labor for calibration, no need to remove the flow through electrode(s), and minimal interruption of sampling.

Szecsody, James E [Richland, WA; Williams, Mark D [Richland, WA; Vermeul, Vince R [Richland, WA

2002-08-20T23:59:59.000Z

458

Enhanced training effectiveness using automated student assessment.  

SciTech Connect (OSTI)

Training simulators have become increasingly popular tools for instructing humans on performance in complex environments. However, the question of how to provide individualized and scenario-specific assessment and feedback to students remains largely an open question. In this work, we follow-up on previous evaluations of the Automated Expert Modeling and Automated Student Evaluation (AEMASE) system, which automatically assesses student performance based on observed examples of good and bad performance in a given domain. The current study provides an empirical evaluation of the enhanced training effectiveness achievable with this technology. In particular, we found that students given feedback via the AEMASE-based debrief tool performed significantly better than students given only instructor feedback.

Forsythe, James Chris

2010-05-01T23:59:59.000Z

459

Automated generation of weld path trajectories.  

SciTech Connect (OSTI)

AUTOmated GENeration of Control Programs for Robotic Welding of Ship Structure (AUTOGEN) is software that automates the planning and compiling of control programs for robotic welding of ship structure. The software works by evaluating computer representations of the ship design and the manufacturing plan. Based on this evaluation, AUTOGEN internally identifies and appropriately characterizes each weld. Then it constructs the robot motions necessary to accomplish the welds and determines for each the correct assignment of process control values. AUTOGEN generates these robot control programs completely without manual intervention or edits except to correct wrong or missing input data. Most ship structure assemblies are unique or at best manufactured only a few times. Accordingly, the high cost inherent in all previous methods of preparing complex control programs has made robot welding of ship structures economically unattractive to the U.S. shipbuilding industry. AUTOGEN eliminates the cost of creating robot control programs. With programming costs eliminated, capitalization of robots to weld ship structures becomes economically viable. Robot welding of ship structures will result in reduced ship costs, uniform product quality, and enhanced worker safety. Sandia National Laboratories and Northrop Grumman Ship Systems worked with the National Shipbuilding Research Program to develop a means of automated path and process generation for robotic welding. This effort resulted in the AUTOGEN program, which has successfully demonstrated automated path generation and robot control. Although the current implementation of AUTOGEN is optimized for welding applications, the path and process planning capability has applicability to a number of industrial applications, including painting, riveting, and adhesive delivery.

Sizemore, John M. (Northrop Grumman Ship Systems); Hinman-Sweeney, Elaine Marie; Ames, Arlo Leroy

2003-06-01T23:59:59.000Z

460

Automated genotyping of dinucleotide repeat markers  

SciTech Connect (OSTI)

The dinucleotide repeats (i.e., microsatellites) such as CA-repeats are a highly polymorphic, highly abundant class of PCR-amplifiable markers that have greatly streamlined genetic mapping experimentation. It is expected that over 30,000 such markers (including tri- and tetranucleotide repeats) will be characterized for routine use in the next few years. Since only size determination, and not sequencing, is required to determine alleles, in principle, dinucleotide repeat genotyping is easily performed on electrophoretic gels, and can be automated using DNA sequencers. Unfortunately, PCR stuttering with these markers generates not one band for each allele, but a pattern of bands. Since closely spaced alleles must be disambiguated by human scoring, this poses a key obstacle to full automation. We have developed methods that overcome this obstacle. Our model is that the observed data is generated by arithmetic superposition (i.e., convolution) of multiple allele patterns. By quantitatively measuring the size of each component band, and exploiting the unique stutter pattern associated with each marker, closely spaced alleles can be deconvolved; this unambiguously reconstructs the {open_quotes}true{close_quotes} allele bands, with stutter artifact removed. We used this approach in a system for automated diagnosis of (X-linked) Duchenne muscular dystrophy; four multiplexed CA-repeats within the dystrophin gene were assayed on a DNA sequencer. Our method accurately detected small variations in gel migration that shifted the allele size estimate. In 167 nonmutated alleles, 89% (149/167) showed no size variation, 9% (15/167) showed 1 bp variation, and 2% (3/167) showed 2 bp variation. We are currently developing a library of dinucleotide repeat patterns; together with our deconvolution methods, this library will enable fully automated genotyping of dinucleotide repeats from sizing data.

Perlin, M.W.; Hoffman, E.P. [Carnegie Mellon Univ., Pittsburgh, PA (United States)]|[Univ. of Pittsburgh, PA (United States)

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Automated Microarray Image Analysis Toolbox for MATLAB  

SciTech Connect (OSTI)

The Automated Microarray Image Analysis (AMIA) Toolbox for MATLAB is a flexible, open-source microarray image analysis tool that allows the user to customize analysis of sets of microarray images. This tool provides several methods of identifying and quantify spot statistics, as well as extensive diagnostic statistics and images to identify poor data quality or processing. The open nature of this software allows researchers to understand the algorithms used to provide intensity estimates and to modify them easily if desired.

White, Amanda M.; Daly, Don S.; Willse, Alan R.; Protic, Miroslava; Chandler, Darrell P.

2005-09-01T23:59:59.000Z

462

Algorithms to Automate LCLS Undulator Tuning  

SciTech Connect (OSTI)

Automation of the LCLS undulator tuning offers many advantages to the project. Automation can make a substantial reduction in the amount of time the tuning takes. Undulator tuning is fairly complex and automation can make the final tuning less dependent on the skill of the operator. Also, algorithms are fixed and can be scrutinized and reviewed, as opposed to an individual doing the tuning by hand. This note presents algorithms implemented in a computer program written for LCLS undulator tuning. The LCLS undulators must meet the following specifications. The maximum trajectory walkoff must be less than 5 {micro}m over 10 m. The first field integral must be below 40 x 10{sup -6} Tm. The second field integral must be below 50 x 10{sup -6} Tm{sup 2}. The phase error between the electron motion and the radiation field must be less than 10 degrees in an undulator. The K parameter must have the value of 3.5000 {+-} 0.0005. The phase matching from the break regions into the undulator must be accurate to better than 10 degrees. A phase change of 113 x 2{pi} must take place over a distance of 3.656 m centered on the undulator. Achieving these requirements is the goal of the tuning process. Most of the tuning is done with Hall probe measurements. The field integrals are checked using long coil measurements. An analysis program written in Matlab takes the Hall probe measurements and computes the trajectories, phase errors, K value, etc. The analysis program and its calculation techniques were described in a previous note. In this note, a second Matlab program containing tuning algorithms is described. The algorithms to determine the required number and placement of the shims are discussed in detail. This note describes the operation of a computer program which was written to automate LCLS undulator tuning. The algorithms used to compute the shim sizes and locations are discussed.

Wolf, Zachary

2010-12-03T23:59:59.000Z

463

Field Demonstration of Automated Demand Response for Both Winter and Summer Events in Large Buildings in the Pacific Northwest  

E-Print Network [OSTI]

of fully automated demand response in large facilities,2009). Open Automated Demand Response CommunicationsOpen Automated Demand Response Technology Demonstration

Piette, Mary Ann

2014-01-01T23:59:59.000Z

464

Automated 3D trabecular bone structure analysis of the proximal femur—prediction of biomechanical strength by CT and DXA  

E-Print Network [OSTI]

z ORIGINAL ARTICLE Automated 3D trabecular bone structureIntroduction An automated 3D segmentation algorithm wasstudy was to use an automated 3D segmentation algorithm to

2010-01-01T23:59:59.000Z

465

Automated FMEA based diagnostic symptom generation  

Science Journals Connector (OSTI)

The comprehensive on-board diagnosis of faults in many aerospace and other engineered systems requires real time execution using limited computational resources, and must also provide verifiable behaviour. This paper shows how a diagnostic system satisfying these requirements can be automatically generated from the model based simulation used to produce an automated Failure Modes and Effect Analysis (FMEA). The resulting diagnostic system comprises a set of efficiently evaluated symptoms and their associated faults. The symptoms are complete in that they include all necessary observations required to determine applicable system operating states, unlike other work that finesses this problem by having models for each operating state and producing diagnostics for each operating state separately. The symptoms are also efficient because they abstract complex system behaviour based on observations available to the diagnostic system and only preserve sufficient symptom detail to isolate faults given these available observations. This work has been done in the context of diagnosing autonomous aircraft, and is illustrated with examples from that domain. The models used as a basis for automated generation of diagnostics were originally produced to automate the production of a FMEA report, and the paper also considers the relationship between FMEA and diagnostics that provides verification of the failure effects predicted by the simulation and hence validation of the generated symptoms.

Neal Snooke; Chris Price

2012-01-01T23:59:59.000Z

466

Towards Automated Invocation of Web APIs  

E-Print Network [OSTI]

Abstract. This paper, targeting the large variety of Web APIs, presents an approach towards automated invocation of Web APIs. This approach applies a data schema, to the SAWSDL lowering schema mapping, a grounding mechanism that connects the ontological representations of Web APIs with their execution messages. It is intuitive to existing standard efforts and effective in coping with the heterogeneities witnessed by a majority of Web APIs. 1. Invocation of Linked Web APIs In recent years, the world of service on the Web has witnessed an increasing dominance of Web APIs over “classical ” Web services characterized by WSDL and SOAP [1]. The Semantic Web Service (SWS) community, aiming to increase the level of automation for tasks like discovery, composition and invocation through semantic descriptions, is challenged by the large variety of Web APIs, particularly when it comes to automated invocation. Not only are Web APIs heterogeneous in the forms of elements essential to their invocation, such as address URI, but they also lack machine processable descriptions to address this heterogeneity [1]. hRESTS, a

Ning Li; Carlos Pedrinaci; Jacek Kopecky; Maria Maleshkova; Dong Liu; John Domingue

2011-01-01T23:59:59.000Z

467

MEMORANDUM FOR DISTRIBUTION FROM: / PAUL BOSCO  

Broader source: Energy.gov (indexed) [DOE]

AUG 1 3 2008 AUG 1 3 2008 MEMORANDUM FOR DISTRIBUTION FROM: / PAUL BOSCO / & /YL DIRECTOR, OPFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT SUBJECT: FY 2008 Real Property Deferred and Annual Maintenance Reporting Requirement REFERENCE: DOE Order 430.1 B: Real Property Asset Management Pursuant to section 5.d. 12 of the referenced Order, this memorandum provides implementing guidance for the FY 2008 deferred and annual maintenance reporting requirements. Please distribute it to the appropriate elements of your organization. The attached Implementation Procedures to Report Deferred and Annual Maintenance on Real Property applies only to real property (buildings, real property trailers and other structures and facilities (OSFs)) not personal property. The data reported under this reporting requirement is

468

Power Systems Engineering Research Center Using Active Customer Participation  

E-Print Network [OSTI]

components and distribution system reliability. The time-varying nature of these resources will alter to improve distribution system reliability. An approach to manage the distribution system assets under are in the area of distribution system automation, reliability enhancement through smart distribution systems

Van Veen, Barry D.

469

The role of assets in improving college attainment among Hispanic immigrant youth in the U.S.  

Science Journals Connector (OSTI)

Despite the importance of higher education, Hispanic immigrant youth still have far lower college attainment rate than whites in the U.S. Existing studies show the significant role of household assets on educational attainment even after controlling for income. Thus, this study examines the role of homeownership and school savings on Hispanic immigrant youth's college attendance and graduation. Findings show that homeownership is a significant positive predictor of Hispanic immigrant youth's college attendance and graduation, but parent school savings is not a significant predictor. Policy and practice implications discussed.

Hyun-a Song; William Elliott III

2011-01-01T23:59:59.000Z

470

Electricity Distribution  

Science Journals Connector (OSTI)

High voltage (HV) distribution grids have nominal voltages of up ... the grid that connects distribution to the transmission substations and also supplies large industrial customers requiri...

Tomás Gómez

2013-01-01T23:59:59.000Z

471

V-132: IBM Tivoli System Automation Application Manager Multiple  

Broader source: Energy.gov (indexed) [DOE]

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

472

V-132: IBM Tivoli System Automation Application Manager Multiple  

Broader source: Energy.gov (indexed) [DOE]

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

473

Automated two column generator systems for medical radionuclides  

Science Journals Connector (OSTI)

This work describes automated chromatographic methods for the separation of medically useful radionuclides from source material containing their parent radionuclides. The separation techniques employ two chromatographic columns to ensure high chemical and radiochemical purity of the product radionuclide. The separations were performed using an automated system, the automated radionuclide separator (ARS2), consisting of syringe pumps and multiport valves controlled through a computer interface. Generator systems for 68Ga, 99mTc, 188Re and 213Bi will be described.

Daniel R. McAlister; E. Philip Horwitz

2009-01-01T23:59:59.000Z

474

Xlink-Identifier: An Automated Data Analysis Platform for Confident...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Chemically Cross-linked Peptides using Xlink-Identifier: An Automated Data Analysis Platform for Confident Identifications of Chemically Cross-linked Peptides using Abstract:...

475

Fueling Robot Automates Hydrogen Hose Reliability Testing (Fact...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Automated robot mimics fueling action to test hydrogen hoses for durability in real-world conditions. With at least three major auto manufacturers expected to release fuel cell...

476

Automated data extraction from in situ protein stable isotope...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

data extraction from in situ protein stable isotope probing studies. Automated data extraction from in situ protein stable isotope probing studies. Abstract: Protein stable isotope...

477

Automated Office Systems Support (AOSS) Quality Assurance Model...  

Broader source: Energy.gov (indexed) [DOE]

assurance model, including checklists, for activity relative to network and desktop computer support. Automated Office Systems Support (AOSS) Quality Assurance Model More...

478

Automation of Treebank Annotation Thorsten Brants and Wojciech Skut  

E-Print Network [OSTI]

Thorsten Brants and Wojciech Skut (1998) Automation of Treebank Annotation. In D.M.W. Powers (ed.) NeMLaP3

479

Automated Demand Response Benefits California Utilities and Commercial...  

Broader source: Energy.gov (indexed) [DOE]

. U.S. Department of Energy |September 2014 Automated Demand Response Benefits California Utilities and Commercial & Industrial Customers Page 1 Under the American Recovery and...

480

Linking Continuous Energy Management and Open Automated Demand Response  

E-Print Network [OSTI]

A. Barat, D. Watson. Demand Response Spinning ReserveOpen Automated Demand Response Communication Standards:Dynamic Controls for Demand Response in a New Commercial

Piette, Mary Ann

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "distribution automation assets" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Northwest Open Automated Demand Response Technology Demonstration Project  

E-Print Network [OSTI]

reliability signals for demand response GTA HTTPS HVAC IT kWand Commissioning Automated Demand Response Systems. ”and Techniques for Demand Response. California Energy

Kiliccote, Sila

2010-01-01T23:59:59.000Z

482

Direct versus Facility Centric Load Control for Automated Demand Response  

E-Print Network [OSTI]

Interoperable Automated Demand Response Infrastructure.and Techniques for Demand Response. LBNL Report 59975. Mayand Communications for Demand Response and Energy Efficiency

Piette, Mary Ann

2010-01-01T23:59:59.000Z

483

UNIVERSITY OF CALIFORNIA, SAN DIEGO Automated Feature Design...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proc. Proceedings of International Workshop on Structural Health Monitoring, Palo Alto, California. 2013. D.Y. Harvey, M.D. Todd, Automated extraction of damage features...

484

Substation automation systems and IEC 61850: interoperability testing.  

E-Print Network [OSTI]

??Dissertação de mest., Engenharia Electrónica e Telecomunicações, Faculdade de Ciências e Tecnologia, Univ. do Algarve, 2011 The Substation Automation System (SAS) is the backbone of… (more)

Evaristo, Henrique A. Guerreiro Dias

2011-01-01T23:59:59.000Z

485

automated segmentation algorithm: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tumor Segmentation using two MRI Modalities Mohamed Ben Salah1 , Idanis Diaz1 automated brain tumor segmentation from only two magnetic resonance image modalities. The technique...

486

Towards Automated Story Analysis Using Participatory Harry Halpin  

E-Print Network [OSTI]

Towards Automated Story Analysis Using Participatory Design Harry Halpin Institute University of Edinburgh 2 Buccleuch Place Edinburgh, UK J.Moore@ed.ac.uk Judy Robertson Human Communications

Moore, Johanna D.

487

An automated testing system for telephony software - A case study.  

E-Print Network [OSTI]

??As the complexity of software system increases, delivering quality software successfully becomes an ever more challenging task. Applying automated testing techniques effectively to the software… (more)

Zhou, Yingxiang Ingrid

2009-01-01T23:59:59.000Z

488

Global health response more accurate with automated influenza...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global health response more accurate with automated influenza surveillance Public health officials will be able to determine whether an outbreak of an infectious disease comes from...

489

ITU G.hn Concept and Home Automation  

Science Journals Connector (OSTI)

For long time, many in the buildings industry have been looking for a day when home automation systems would become fully integrated with communication...

Manfred Schneps-Schneppe

2009-01-01T23:59:59.000Z

490

PaR-PaR Laboratory Automation Platform  

Science Journals Connector (OSTI)

Since more time and effort is often required to instruct a robot to perform a new task than the robot saves a researcher by performing the task, researchers can only effectively automate a small fraction of their workflows. ... As the biological design/implementation process becomes increasingly software-automated,(10-26) achieving this ideal will become increasingly important so that researchers across laboratories with different robotics platforms can all benefit from design automation software innovations. ... By automating the design of DNA fabrication schemes using computational algorithms, we can eliminate human error while reducing redundant operations, thus minimizing the time and cost required for conducting biol. ...

Gregory Linshiz; Nina Stawski; Sean Poust; Changhao Bi; Jay D. Keasling; Nathan J. Hillson

2012-10-04T23:59:59.000Z

491

Assessment of the Current Level of Automation in the Manufacture...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assessment of the Current Level of Automation in the Manufacture of Fuel Cell Systems for Combined Heat and Power Applications Michael Ulsh National Renewable Energy Laboratory...

492

Individual differences in the calibration of trust in automation.  

E-Print Network [OSTI]

??A large body of research has identified that one of the major factors influencing decisions about automation use is operator's trust. Studies have shown that… (more)

Pop, Vlad Liviu

2013-01-01T23:59:59.000Z

493

Electrically calibrated absolute radiometer suitable for measurement automation  

Science Journals Connector (OSTI)

New electrically calibrated absolute radiometers (ESRs) were developed having fast response and high responsivity; these ESRs are specially useful for measurement automation. They are...

Boivin, Louis-Philippe; McNeely, Francis T

1986-01-01T23:59:59.000Z

494

Lean Automation: Combining Lean with Industrial Robotics in Real Examples.  

E-Print Network [OSTI]

?? The purpose of this report is to analyze whether we can have a better automation manufacturing using lean solutions. First, this report is started… (more)

Delkhosh, Ali

2012-01-01T23:59:59.000Z

495

AUTOMATION IN THE MEAT INDUSTRY | Cutting and Boning  

Science Journals Connector (OSTI)

Abstract The strongest incentives for the industry to adopt automation technology for cutting and boning relate to the drive for improved productivity through reduced labor. Also work environment, increased yield and adaptability to a wide range of customer specifications are important drivers. Automation in the pig meat industry has mainly been adopted in regions with high labor costs such as Northern Europe. In New Zealand the ovine meat industry has been progressive in developing and using automation technology. Automation in the beef industry is limited because of the complexity associated with handling of the size and biological variation of the material.

R. Clarke; J.U. Nielsen; N.T. Madsen

2014-01-01T23:59:59.000Z

496

Automation to Support Risk Assessment and Management at DHS  

Science Journals Connector (OSTI)

DHS is pursuing a portfolio of research and development projects known as the Threat Assessment Portfolio, conducting a range of cross-cutting analytic automation research to address...

Dennis, Stephen

497

Examining the Process of Automation Development and Deployment.  

E-Print Network [OSTI]

??In order to develop a better understanding of the process of development and deployment of automated systems, this thesis examines aspects of project execution and… (more)

Barsalou, Edward

2006-01-01T23:59:59.000Z

498

Fully Automated Radiation Hardened by Design Circuit Construction.  

E-Print Network [OSTI]

??A fully automated logic design methodology for radiation hardened by design (RHBD) high speed logic using fine grained triple modular redundancy (TMR) is presented. The… (more)

Hindman, Nathan David

2012-01-01T23:59:59.000Z

499

Automation of Nested Matrix and Derivative Operations Robert Kalaba  

E-Print Network [OSTI]

Automation of Nested Matrix and Derivative Operations Robert Kalaba Departments of Electrical of expressions involving nested matrix and derivative operations. The need to differentiate such expressions

Tesfatsion, Leigh

500

IEEE Transactions on Automation Science and Engineering Compensation of Scanner Creep and Hysteresis  

E-Print Network [OSTI]

IEEE Transactions on Automation Science and Engineering Compensation of Scanner Creep uncertainties associated with creep and hysteresis, and supports automated, computer-controlled manipulation) and by automation, which bypasses the time- consuming

Southern California, University of