Sample records for discussion pipeline development

  1. The pipeline and future of drug development in schizophrenia

    E-Print Network [OSTI]

    Gray, J A; Roth, B L

    2007-01-01T23:59:59.000Z

    The Pipeline and Future of Drug Development in SchizophreniaThe Drug Discovery Pipeline in Schizophrenia Keywords:discuss the current pipeline of drugs for schizophrenia,

  2. Hydrogen Pipeline Discussion | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet), GeothermalGridHYDROGEND D e e&FundingDiscussion Hydrogen Pipeline

  3. Coal-log pipeline system development

    SciTech Connect (OSTI)

    Liu, H.

    1991-12-01T23:59:59.000Z

    Project tasks include: (1) Perform the necessary testing and development to demonstrate that the amount of binder in coal logs can be reduced to 8% or lower to produce logs with adequate strength to eliminate breakage during pipeline transportation, under conditions experienced in long distance pipeline systems. Prior to conducting any testing and demonstration, grantee shall perform an information search and make full determination of all previous attempts to extrude or briquette coal, upon which the testing and demonstration shall be based. (2) Perform the necessary development to demonstrate a small model of the most promising injection system for coal-logs, and tests the logs produced. (3) Conduct economic analysis of coal-log pipeline, based upon the work to date. Refine and complete the economic model. (VC)

  4. Survey of state water laws affecting coal slurry pipeline development

    SciTech Connect (OSTI)

    Rogozen, M.B.

    1980-11-01T23:59:59.000Z

    This report summarizes state water laws likely to affect the development of coal slurry pipelines. It was prepared as part of a project to analyze environmental issues related to energy transportation systems. Coal slurry pipelines have been proposed as a means to expand the existing transportation system to handle the increasing coal shipments that will be required in the future. The availability of water for use in coal slurry systems in the coal-producing states is an issue of major concern.

  5. Freight pipelines

    SciTech Connect (OSTI)

    Liu, H. (University of Missouri, Columbia, MO (US)); Round, G.F. (McMaster University (CA))

    1989-01-01T23:59:59.000Z

    This book presents papers on slurry pipelines, pneumatic pipelines, capsule pipelines, pipeline education, and pipeline research.

  6. The development of a chemical biology pipeline for the identification of small molecules that induce cardiopoiesis in murine embryonic stem cells

    E-Print Network [OSTI]

    Bushway, Paul Jay

    2012-01-01T23:59:59.000Z

    of a Chemical Biology Pipeline for the Identification ofof a Chemical Biology Pipeline for the Identification ofhinge on the drug development pipeline and the importance of

  7. Some applications of pipelining techniques in parallel scientific computing 

    E-Print Network [OSTI]

    Deng, Yuanhua

    1996-01-01T23:59:59.000Z

    In this thesis, we study the applicability of pipelining techniques to the development of parallel algorithms for scientific computation. General principles for pipelining techniques are discussed and two applications, Gram-Schmidt orthogonalization...

  8. Some applications of pipelining techniques in parallel scientific computing

    E-Print Network [OSTI]

    Deng, Yuanhua

    1996-01-01T23:59:59.000Z

    In this thesis, we study the applicability of pipelining techniques to the development of parallel algorithms for scientific computation. General principles for pipelining techniques are discussed and two applications, Gram-Schmidt orthogonalization...

  9. New developments in pipeline charging preheated coal at Inland Steel

    SciTech Connect (OSTI)

    Sorensen, S.M. Jr.; Arsenault, A.A.; Rupp, P.A.

    1982-01-01T23:59:59.000Z

    The first commercial installation of a new pipeline oven charging system for preheated coal, designed by Dynamic Air, Inc., was made at Inland Steel's C Battery in October 1979. With the Dynamic Air charging sytem, production losses due to pipeline delays have been virtually eliminated, pipeline maintenance requirements have been reduced by 90%, conveying steam requirements have been significantly reduced, and oven charge weights have been increased by 500 kg (1000 lb). A test program was subsequently conducted during November and December 1980, to evaluate the use of nitrogen as a conveying medium for pipeline oven charging with the Dynamic Air system. The test results clearly demonstrated that the same weight of preheated coal could be charged into an oven by using either steam or nitrogen as the conveying medium. Moreover, it was found that pipeline oven charging with the Dynamic Air system is a function of the mass flow rate of the conveying medium. With nitrogen charging, an average 9% increase in oven charge rates was obtained at comparable conveying gas mass flow rates and charging bin pressures. In addition, average oven pressure during charging was reduced by approximately 40% and solids carryover was reduced by 100 kg (220 lb) per oven charge with nitrogen charging. It was found that solids carryover during pipeline oven charging is a function of the average pressure generated in the oven during charging, but it was also found that a large oven pressure surge at the end of the charge can produce excessive carryover to completely mask the effect.

  10. Alaskan Natural Gas Pipeline Developments (released in AEO2007)

    Reports and Publications (EIA)

    2007-01-01T23:59:59.000Z

    The Annual Energy Outlook 2007 reference case projects that an Alaska natural gas pipeline will go into operation in 2018, based on the Energy Information Administration's current understanding of the projects time line and economics. There is continuing debate, however, about the physical configuration and the ownership of the pipeline. In addition, the issue of Alaskas oil and natural gas production taxes has been raised, in the context of a current market environment characterized by rising construction costs and falling natural gas prices. If rates of return on investment by producers are reduced to unacceptable levels, or if the project faces significant delays, other sources of natural gas, such as unconventional natural gas production and liquefied natural gas imports, could fulfill the demand that otherwise would be served by an Alaska pipeline.

  11. Development of Protective Coatings for Co-Sequestration Processes and Pipelines

    SciTech Connect (OSTI)

    Gordon Bierwagen; Yaping Huang

    2011-11-30T23:59:59.000Z

    The program, entitled â??Development of Protective Coatings for Co-Sequestration Processes and Pipelinesâ?, examined the sensitivity of existing coating systems to supercritical carbon dioxide (SCCO2) exposure and developed new coating system to protect pipelines from their corrosion under SCCO2 exposure. A literature review was also conducted regarding pipeline corrosion sensors to monitor pipes used in handling co-sequestration fluids. Research was to ensure safety and reliability for a pipeline involving transport of SCCO2 from the power plant to the sequestration site to mitigate the greenhouse gas effect. Results showed that one commercial coating and one designed formulation can both be supplied as potential candidates for internal pipeline coating to transport SCCO2.

  12. Coal-log pipeline system development. Fifth quarterly report, August 25, 1991--November 25, 1991

    SciTech Connect (OSTI)

    Liu, H.

    1991-12-01T23:59:59.000Z

    Project tasks include: (1) Perform the necessary testing and development to demonstrate that the amount of binder in coal logs can be reduced to 8% or lower to produce logs with adequate strength to eliminate breakage during pipeline transportation, under conditions experienced in long distance pipeline systems. Prior to conducting any testing and demonstration, grantee shall perform an information search and make full determination of all previous attempts to extrude or briquette coal, upon which the testing and demonstration shall be based. (2) Perform the necessary development to demonstrate a small model of the most promising injection system for coal-logs, and tests the logs produced. (3) Conduct economic analysis of coal-log pipeline, based upon the work to date. Refine and complete the economic model. (VC)

  13. Investigation about the effects of exterior surface paint color on temperature development in aboveground pipeline

    SciTech Connect (OSTI)

    Farzaneh-Gord, Mahmood; Rasekh, Alireza; Nabati, Amin; Saadat, Morteza [Faculty of Mechanical Engineering, Shahrood University of Technology, Shahrood (Iran, Islamic Republic of)

    2010-12-15T23:59:59.000Z

    A practical analytical model for predicting temperature development of incompressible flow inside an aboveground pipeline has been constructed and presented in this research work. The outer surface of the pipeline is exposed to solar radiation and wind stream. The radiation heat exchange with ambient is also taken into account. The effects of exterior surface paint color represented by emissivity and absorptivity, have been studied. The model has been developed to study crude oil flow temperature development through a specific pipeline. The results obtained by the model show that the bulk temperature inclined to a limiting value in some distance which affected mainly by Reynolds numbers. It is found that emissivity and absorptivity of surface are predominant parameters in temperature development in an aboveground pipeline flow which can increase or decrease pipe surface and fluid temperature especially for low Reynolds number flow. Based on the results which indicated significantly of exterior surface paint color, one should choose the paint color by considering its effects on temperature development. (author)

  14. DEVELOPMENT OF DEPOSIT DETECTION SYSTEM IN PIPELINES OF THE STEELWORKS USING CS-137 GAMMA-RAY

    SciTech Connect (OSTI)

    Song, Won-Joon; Lee, Seung-Hee; Jeong, Hee-Dong [Research Institute of Industrial Science and Technology, 32 Hyoja-Dong, Nam-Ku, Pohang, 790-330 (Korea, Republic of)

    2008-02-28T23:59:59.000Z

    The deposit is built up in the pipeline of the steelworks by the chemical reaction among COG (coke oven gas), BFG (blast furnace gas), moisture, and steel in the high temperature environment and obstructs the smooth gas flow. In this study a gamma-ray system is developed to detect the deposit accumulated in pipelines and calculate the accumulation rate with respect to the cross section area of pipes. Cs-137 is used as the gamma-ray source and the system is designed to apply to pipes of various diameters. This system also includes the DB for storage and display of the measurement results so that it can be used for the efficient management of the pipelines.

  15. Natural Gas Pipeline Utilities (Maine)

    Broader source: Energy.gov [DOE]

    These regulations apply to entities seeking to develop and operate natural gas pipelines and provide construction requirements for such pipelines. The regulations describe the authority of the...

  16. Managing the integration of technology into the product development pipeline

    E-Print Network [OSTI]

    Barretto, Eduardo F., 1971-

    2005-01-01T23:59:59.000Z

    Managing the integration of technology is a complex task in any industry, but especially so in the highly competitive automotive industry. Automakers seek to develop plans to integrate technology into their products such ...

  17. Code for Hydrogen Hydrogen Pipeline

    E-Print Network [OSTI]

    #12;2 Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop Augusta, Georgia August development ¡ Charge from BPTCS to B31 Standards Committee for Hydrogen Piping/Pipeline code development ¡ B31.12 Status & Structure ¡ Hydrogen Pipeline issues ¡ Research Needs ¡ Where Do We Go From Here? #12;4 Code

  18. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    SciTech Connect (OSTI)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)] [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01T23:59:59.000Z

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

  19. New perspectives on the damage estimation for buried pipeline systems due to seismic wave propagation

    SciTech Connect (OSTI)

    Pineda Porras, Omar Andrey [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    Over the past three decades, seismic fragility fonnulations for buried pipeline systems have been developed following two tendencies: the use of earthquake damage scenarios from several pipeline systems to create general pipeline fragility functions; and, the use of damage scenarios from one pipeline system to create specific-system fragility functions. In this paper, the advantages and disadvantages of both tendencies are analyzed and discussed; in addition, a summary of what can be considered the new challenges for developing better pipeline seismic fragility formulations is discussed. The most important conclusion of this paper states that more efforts are needed to improve the estimation of transient ground strain -the main cause of pipeline damage due to seismic wave propagation; with relevant advances in that research field, new and better fragility formulations could be developed.

  20. Rnnotator Assembly Pipeline

    SciTech Connect (OSTI)

    Martin, Jeff [DOE Joint Genome Institute

    2010-06-03T23:59:59.000Z

    Jeff Martin of the DOE Joint Genome Institute discusses a de novo transcriptome assembly pipeline from short RNA-Seq reads on June 3, 2010 at the "Sequencing, Finishing, Analysis in the Future" meeting in Santa Fe, NM

  1. FEATURE ARTICLE Pipeline Corrosion

    E-Print Network [OSTI]

    Botte, Gerardine G.

    F FEATURE ARTICLE Pipeline Corrosion Issues Related to Carbon Capture, Transportation, and Storage Capture, Transportation, and Storage--Aspects of Corrosion and Materials. "Until these new technologies are developed and applied, corrosion engineers are focusing on how to best design pipelines for CO2 transport

  2. Development of the Write Process for Pipeline-Ready Heavy Oil

    SciTech Connect (OSTI)

    Lee Brecher; Charles Mones; Frank Guffey

    2009-03-07T23:59:59.000Z

    Work completed under this program advances the goal of demonstrating Western Research Institute's (WRI's) WRITE{trademark} process for upgrading heavy oil at field scale. MEG Energy Corporation (MEG) located in Calgary, Alberta, Canada supported efforts at WRI to develop the WRITE{trademark} process as an oil sands, field-upgrading technology through this Task 51 Jointly Sponsored Research project. The project consisted of 6 tasks: (1) optimization of the distillate recovery unit (DRU), (2) demonstration and design of a continuous coker, (3) conceptual design and cost estimate for a commercial facility, (4) design of a WRITE{trademark} pilot plant, (5) hydrotreating studies, and (6) establish a petroleum analysis laboratory. WRITE{trademark} is a heavy oil and bitumen upgrading process that produces residuum-free, pipeline ready oil from heavy material with undiluted density and viscosity that exceed prevailing pipeline specifications. WRITE{trademark} uses two processing stages to achieve low and high temperature conversion of heavy oil or bitumen. The first stage DRU operates at mild thermal cracking conditions, yielding a light overhead product and a heavy residuum or bottoms material. These bottoms flow to the second stage continuous coker that operates at severe pyrolysis conditions, yielding light pyrolyzate and coke. The combined pyrolyzate and mildly cracked overhead streams form WRITE{trademark}'s synthetic crude oil (SCO) production. The main objectives of this project were to (1) complete testing and analysis at bench scale with the DRU and continuous coker reactors and provide results to MEG for process evaluation and scale-up determinations and (2) complete a technical and economic assessment of WRITE{trademark} technology to determine its viability. The DRU test program was completed and a processing envelope developed. These results were used for process assessment and for scaleup. Tests in the continuous coker were intended to determine the throughput capability of the coker so a scaled design could be developed that maximized feed rate for a given size of reactor. These tests were only partially successful because of equipment problems. A redesigned coker, which addressed the problems, has been build but not operated. A preliminary economic analysis conducted by MEG and an their engineering consultant concluded that the WRITE{trademark} process is a technically feasible method for upgrading bitumen and that it produces SCO that meets pipeline specifications for density. When compared to delayed coking, the industry benchmark for thermal upgrading of bitumen, WRITE{trademark} produced more SCO, less coke, less CO{sub 2} per barrel of bitumen fed, and had lower capital and operating costs. On the other hand, WRITE{trademark}'s lower processing severity yielded crude with higher density and a different product distribution for naphtha, light gas oil and vacuum oil that, taken together, might reduce the value of the SCO. These issues plus the completion of more detailed process evaluation and economics need to be resolved before WRITE{trademark} is deployed as a field-scale pilot.

  3. Consortium for coal log pipeline research and development. Final technical progress report, August 10, 1993--August 9, 1996

    SciTech Connect (OSTI)

    Marrero, T.R.

    1996-10-01T23:59:59.000Z

    The main objective of this project was to conduct intensive research and development of the Coal Log Pipeline (CLP). Specifically, the R & D was to concentrate on previously neglected and insufficiently studied aspects of CLP which were deemed significant. With improvements in these areas, CLP could be implemented for commercial use within five years. CLP technology is capable of transporting coal logs for long distances. The many potential advantages of CLP over truck and railroad transportation include: lower freight costs, less energy consumption, less air pollution, decreased environmental problems, increased safety, and improved reliability. Previous studies have shown that CLP is advantageous over slurry pipeline technology. First, CLP uses one-third the water required by a coal slurry pipeline. Second, CLP provides easier coal dewatering. Third, the CLP conveying capacity of coal is twice as much as a slurry transport line of equal diameter. In many situations, the cost for transporting each ton of coal is expected to be less expensive by CLP as compared to other competing modes of transportation such as: truck, unit train and slurry pipeline.

  4. DEVELOPMENT OF AN ENVIRONMENTALLY BENIGN MICROBIAL INHIBITOR TO CONTROL INTERNAL PIPELINE CORROSION

    SciTech Connect (OSTI)

    Bill W. Bogan; Brigid M. Lamb; John J. Kilbane II

    2004-10-30T23:59:59.000Z

    The overall program objective is to develop and evaluate environmentally benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is to develop one or more environmentally benign (a.k.a. ''green'') products that can be applied to maintain the structure and dependability of the natural gas infrastructure. Previous testing indicated that the growth, and the metal corrosion caused by pure cultures of sulfate reducing bacteria were inhibited by hexane extracts of some pepper plants. This quarter tests were performed to determine if chemical compounds other than pepper extracts could inhibit the growth of corrosion-associated microbes and to determine if pepper extracts and other compounds can inhibit corrosion when mature biofilms are present. Several chemical compounds were shown to be capable of inhibiting the growth of corrosion-associated microorganisms, and all of these compounds limited the amount of corrosion caused by mature biofilms to a similar extent. It is difficult to control corrosion caused by mature biofilms, but any compound that disrupts the metabolism of any of the major microbial groups present in corrosion-associated biofilms shows promise in limiting the amount/rate of corrosion.

  5. Pipelines (Minnesota)

    Broader source: Energy.gov [DOE]

    This section regulates pipelines that are used to carry natural or synthetic gas at a pressure of more than 90 pounds per square inch, along with pipelines used to carry petroleum products and coal...

  6. Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes

    E-Print Network [OSTI]

    Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat

  7. Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freig pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestr

    E-Print Network [OSTI]

    Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freig pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation ope

  8. DEVELOPMENT OF AN ENVIRONMENTALLY BENIGN MICROBIAL INHIBITOR TO CONTROL INTERNAL PIPELINE CORROSION

    SciTech Connect (OSTI)

    Bill W. Bogan; Brigid M. Lamb; Gemma Husmillo; Kristine Lowe; J. Robert Paterek; John J. Kilbane II

    2004-12-01T23:59:59.000Z

    The overall program objective is to develop and evaluate environmentally benign agents or products that are effective in the prevention, inhibition, and mitigation of microbially influenced corrosion (MIC) in the internal surfaces of metallic natural gas pipelines. The goal is to develop one or more environmentally benign (a.k.a. ''green'') products that can be applied to maintain the structure and dependability of the natural gas infrastructure. Various chemicals that inhibit the growth and/or the metabolism of corrosion-associated microbes such as sulfate reducing bacteria, denitrifying bacteria, and methanogenic bacteria were evaluated to determine their ability to inhibit corrosion in experiments utilizing pure and mixed bacterial cultures, and planktonic cultures as well as mature biofilms. Planktonic cultures are easier to inhibit than mature biofilms but several compounds were shown to be effective in decreasing the amount of metal corrosion. Of the compounds tested hexane extracts of Capsicum pepper plants and molybdate were the most effective inhibitors of sulfate reducing bacteria, bismuth nitrate was the most effective inhibitor of nitrate reducing bacteria, and 4-((pyridine-2-yl)methylamino)benzoic acid (PMBA) was the most effective inhibitor of methanogenic bacteria. All of these compounds were demonstrated to minimize corrosion due to MIC, at least in some circumstances. The results obtained in this project are consistent with the hypothesis that any compound that disrupts the metabolism of any of the major microbial groups present in corrosion-associated biofilms shows promise in limiting the amount/rate of corrosion. This approach of controlling MIC by controlling the metabolism of biofilms is more environmentally benign than the current approach involving the use of potent biocides, and warrants further investigation.

  9. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Nancy Porter; Mike Sullivan; Chris Neary

    2003-05-01T23:59:59.000Z

    The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: two with composite liners and two without.

  10. About U.S. Natural Gas Pipelines

    Reports and Publications (EIA)

    2007-01-01T23:59:59.000Z

    This information product provides the interested reader with a broad and non-technical overview of how the U.S. natural gas pipeline network operates, along with some insights into the many individual pipeline systems that make up the network. While the focus of the presentation is the transportation of natural gas over the interstate and intrastate pipeline systems, information on subjects related to pipeline development, such as system design and pipeline expansion, are also included.

  11. Pipeline inspection using an autonomous underwater vehicle

    SciTech Connect (OSTI)

    Egeskov, P.; Bech, M. [Maridan Aps., Hoersholm (Denmark); Bowley, R. [TSS Ltd., Weston-on-the-Green (United Kingdom); Aage, C. [Technical Univ. of Denmark, Lyngby (Denmark). Dept. of Ocean Engineering

    1995-12-31T23:59:59.000Z

    Pipeline inspection can be carried out by means of small Autonomous Underwater Vehicles (AUVs), operating either with a control link to a surface vessel, or totally independently. The AUV offers an attractive alternative to conventional inspection methods where Remotely Operated Vehicles (ROVs) or paravanes are used. A flatfish type AUV ``MARTIN`` (Marine Tool for Inspection) has been developed for this purpose. The paper describes the proposed types of inspection jobs to be carried out by ``MARTIN``. The design and construction of the vessel, its hydrodynamic properties, its propulsion and control systems are discussed. The pipeline tracking and survey systems, as well as the launch and recovery systems are described.

  12. Overview of interstate hydrogen pipeline systems.

    SciTech Connect (OSTI)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01T23:59:59.000Z

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines. The following discussion will focus on the similarities and differences between the two pipeline networks. Hydrogen production is currently concentrated in refining centers along the Gulf Coast and in the Farm Belt. These locations have ready access to natural gas, which is used in the steam methane reduction process to make bulk hydrogen in this country. Production centers could possibly change to lie along coastlines, rivers, lakes, or rail lines, should nuclear power or coal become a significant energy source for hydrogen production processes. Should electrolysis become a dominant process for hydrogen production, water availability would be an additional factor in the location of production facilities. Once produced, hydrogen must be transported to markets. A key obstacle to making hydrogen fuel widely available is the scale of expansion needed to serve additional markets. Developing a hydrogen transmission and distribution infrastructure would be one of the challenges to be faced if the United States is to move toward a hydrogen economy. Initial uses of hydrogen are likely to involve a variety of transmission and distribution methods. Smaller users would probably use truck transport, with the hydrogen being in either the liquid or gaseous form. Larger users, however, would likely consider using pipelines. This option would require specially constructed pipelines and the associated infrastructure. Pipeline transmission of hydrogen dates back to late 1930s. These pipelines have generally operated at less than 1,000 pounds per square inch (psi), with a good safety record. Estimates of the existing hydrogen transmission system in the United States range from about 450 to 800 miles. Estimates for Europe range from about 700 to 1,100 miles (Mohipour et al. 2004; Amos 1998). These seemingly large ranges result from using differing criteria in determining pipeline distances. For example, some analysts consider only pipelines above a certain diameter as transmission lines. Others count only those pipelines that transport hydrogen from a producer to a customer (e.g., t

  13. Equivalence Checking for Function Pipelining in Behavioral Synthesis

    E-Print Network [OSTI]

    Xie, Fei

    on subtle design invariants. Function pipelining (a.k.a. system-level pipelining) is an important, correct-by-construction abstraction of function pipeline; thus, instead of developing pipelineEquivalence Checking for Function Pipelining in Behavioral Synthesis Kecheng Hao, Sandip Ray

  14. The development of mathematical model for cool down technique in the LNG pipe-line system

    SciTech Connect (OSTI)

    Hamaogi, Kenji; Takatani, Kouji; Kosugi, Sanai; Fukunaga, Takeshi

    1999-07-01T23:59:59.000Z

    An increase in demand for LNG as energy source can be expected since LNG is clean, in stable supply and produces low levels of carbon dioxide. Expansion of various LNG plants is planned. However, the optimal design of the LNG pipe-line systems has not yet been determined since the LNG transport phenomenon is not yet fully understood clearly. For example, in the LNG pipe-line system, large temperature gradients occur when the LNG transport starts. Therefore, although the necessity to cool down the pipe in order to minimize serious deformation is clear, the studies to understand it quantitatively have not been carried out. In this study, experiments on a commercial plant scale and a computer simulation, made up of structural analysis and two phase flow simulation were carried out to establish a prediction model of pipe deformation and to understand the phenomenon in the pipe.

  15. Hydrogen Delivery Technologies and Pipeline Transmission of Hydrogen

    E-Print Network [OSTI]

    Hydrogen Delivery Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives, and Infrastructure Technologies Program #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation development) #12;Pipeline Transmission of Hydrogen --- 3 Copyright: Future H2 Infrastructure Wind Powered

  16. The LOFAR Transients Pipeline

    E-Print Network [OSTI]

    Swinbank, John D; Molenaar, Gijs J; Rol, Evert; Rowlinson, Antonia; Scheers, Bart; Spreeuw, Hanno; Bell, Martin E; Broderick, Jess W; Carbone, Dario; van der Horst, Alexander J; Law, Casey J; Wise, Michael; Breton, Rene P; Cendes, Yvette; Corbel, Stéphane; Eislöffel, Jochen; Falcke, Heino; Fender, Rob; Greißmeier, Jean-Mathias; Hessels, Jason W T; Stappers, Benjamin W; Stewart, Adam J; Wijers, Ralph A M J; Wijnands, Rudy; Zarka, Philippe

    2015-01-01T23:59:59.000Z

    Current and future astronomical survey facilities provide a remarkably rich opportunity for transient astronomy, combining unprecedented fields of view with high sensitivity and the ability to access previously unexplored wavelength regimes. This is particularly true of LOFAR, a recently-commissioned, low-frequency radio interferometer, based in the Netherlands and with stations across Europe. The identification of and response to transients is one of LOFAR's key science goals. However, the large data volumes which LOFAR produces, combined with the scientific requirement for rapid response, make automation essential. To support this, we have developed the LOFAR Transients Pipeline, or TraP. The TraP ingests multi-frequency image data from LOFAR or other instruments and searches it for transients and variables, providing automatic alerts of significant detections and populating a lightcurve database for further analysis by astronomers. Here, we discuss the scientific goals of the TraP and how it has been desig...

  17. Deliverability on the interstate natural gas pipeline system

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  18. Pipeline Setback Ordinance (Minnesota)

    Broader source: Energy.gov [DOE]

    This statute establishes the Office of Pipeline Safety to regulate pipelines in Minnesota. Among other duties, the office is responsible for implementing a Model Pipeline Setback Ordinance.

  19. Systematic Engine Uprate Technology Development and Deployment for Pipeline Compressor Engines through Increased Torque

    SciTech Connect (OSTI)

    Dennis Schmitt; Daniel Olsen

    2005-09-30T23:59:59.000Z

    Three methods were utilized to analyze key components of slow-speed, large-bore, natural gas integral engines. These three methods included the application of computational fluid dynamics (CFD), dynamic modal analysis using finite element analysis (FEA), and a stress analysis method also using FEA. The CFD analysis focuses primarily on the fuel mixing in the combustion chamber of a TLA engine. Results indicate a significant increase in the homogeneity of the air and fuel using high-pressure fuel injection (HPFI) instead of standard low-pressure mechanical gas admission valve (MGAV). A modal analysis of three engine crankshafts (TLA-6, HBA-6, and GMV-10) is developed and presented. Results indicate that each crankshaft has a natural frequency and corresponding speed that is well away from the typical engine operating speed. A frame stress analysis method is also developed and presented. Two different crankcases are examined. A TLA-6 crankcase is modeled and a stress analysis is performed. The method of dynamic load determination, model setup, and the results from the stress analysis are discussed. Preliminary results indicate a 10%-15% maximum increase in frame stress due to a 20% increase in HP. However, the high stress regions were localized. A new hydraulically actuated mechanical fuel valve is also developed and presented. This valve provides equivalent high-energy (supersonic) fuel injection comparable to a HPFI system, at 1/5th of the natural gas fuel pressure. This valve was developed in cooperation with the Dresser-Rand Corporation.

  20. Pipeline ADC Design Methodology

    E-Print Network [OSTI]

    Zhao, Hui

    2012-01-01T23:59:59.000Z

    Scaling vs. R. Figure 4.8 Pipeline ADC Structures. Figure2.4 A Pipelined ADC. Figure 3.1 Pipeline ADC Transfer Curve.Modes (b) data latency in pipeline ADC Figure 3.3 Detailed

  1. Cathodic protection retrofit of an offshore pipeline

    SciTech Connect (OSTI)

    Winters, R.H.; Holk, A.C. [Tenneco Energy, Houston, TX (United States)

    1997-09-01T23:59:59.000Z

    Cathodic protection (CP) anodes and corrosion coating on two offshore pipelines were damaged during deep water installation. In-situ methods for deep-water inspection and repair of the pipelines` CP and coating systems were developed and used. High-pressure natural gas Pipeline. A design was 5.6 miles of 8.625 in. OD by 0.406 in. W.T. API SL, Grade X-42, seamless line pipe. Pipeline B design was 0.3 miles of similar specification pipe. Both pipelines were mill-coated with 14 mil of fusion-bonded epoxy (FBE) corrosion coating. Girth welds were field-coated with FBE.

  2. The SINFONI pipeline

    E-Print Network [OSTI]

    Andrea Modigliani; Wolfgang Hummel; Roberto Abuter; Paola Amico; Pascal Ballester; Richard Davies; Christophe Dumas; Mattew Horrobin; Mark Neeser; Markus Kissler-Patig; Michele Peron; Juha Rehunanen; Juergen Schreiber; Thomas Szeifert

    2007-02-05T23:59:59.000Z

    The SINFONI data reduction pipeline, as part of the ESO-VLT Data Flow System, provides recipes for Paranal Science Operations, and for Data Flow Operations at Garching headquarters. At Paranal, it is used for the quick-look data evaluation. For Data Flow Operations, it fulfills several functions: creating master calibrations; monitoring instrument health and data quality; and reducing science data for delivery to service mode users. The pipeline is available to the science community for reprocessing data with personalised reduction strategies and parameters. The pipeline recipes can be executed either with EsoRex at the command line level or through the Gasgano graphical user interface. The recipes are implemented with the ESO Common Pipeline Library (CPL). SINFONI is the Spectrograph for INtegral Field Observations in the Near Infrared (1.1-2.45 um) at the ESO-VLT. SINFONI was developed and build by ESO and MPE in collaboration with NOVA. It consists of the SPIFFI integral field spectrograph and an adaptive optics module which allows diffraction limited and seeing limited observations. The image slicer of SPIFFI chops the SINFONI field of view on the sky in 32 slices which are re-arranged to a pseudo slit. The latter is dispersed by one of the four possible gratings (J, H, K, H+K). The detector thus sees a spatial dimension (along the pseudo-slit) and a spectral dimension. We describe in this paper the main data reduction procedures of the SINFONI pipeline, which is based on SPRED - the SPIFFI data reduction software developed by MPE, and the most recent developments after more than a year of SINFONI operations.

  3. Using Fuzzy Logic for Automatic Analysis of Astronomical Pipelines

    E-Print Network [OSTI]

    Lior Shamir; Robert J. Nemiroff

    2005-06-27T23:59:59.000Z

    Fundamental astronomical questions on the composition of the universe, the abundance of Earth-like planets, and the cause of the brightest explosions in the universe are being attacked by robotic telescopes costing billions of dollars and returning vast pipelines of data. The success of these programs depends on the accuracy of automated real time processing of the astronomical images. In this paper the needs of modern astronomical pipelines are discussed in the light of fuzzy-logic based decision-making. Several specific fuzzy-logic algorithms have been develop for the first time for astronomical purposes, and tested with excellent results on data from the existing Night Sky Live sky survey.

  4. Gas Pipeline Safety (Indiana)

    Broader source: Energy.gov [DOE]

    This section establishes the Pipeline Safety Division within the Utility Regulatory Commission to administer federal pipeline safety standards and establish minimum state safety standards for...

  5. Pipeline Safety (Maryland)

    Broader source: Energy.gov [DOE]

    The Public Service Commission has the authority enact regulations pertaining to pipeline safety. These regulations address pipeline monitoring, inspections, enforcement, and penalties.

  6. Intrastate Pipeline Safety (Minnesota)

    Broader source: Energy.gov [DOE]

    These regulations provide standards for gas and liquid pipeline maintenance and operating procedures, per the Federal Hazardous Liquid and Natural Gas Pipeline Safety Acts, and give the...

  7. Pipeline Safety (South Dakota)

    Broader source: Energy.gov [DOE]

    The South Dakota Pipeline Safety Program, administered by the Public Utilities Commission, is responsible for regulating hazardous gas intrastate pipelines. Relevant legislation and regulations...

  8. Pipeline Operations Program (Louisiana)

    Broader source: Energy.gov [DOE]

    The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

  9. The VVDS data reduction pipeline: introducing VIPGI, the VIMOS Interactive Pipeline and Graphical Interface

    E-Print Network [OSTI]

    M. Scodeggio; P. Franzetti; B. Garilli; A. Zanichelli; S. Paltani; D. Maccagni; D. Bottini; V. Le Brun; T. Contini; R. Scaramella; C. Adami; S. Bardelli; E. Zucca; L. Tresse; O. Ilbert; S. Foucaud; A. Iovino; R. Merighi; G. Zamorani; I. Gavignaud; D. Rizzo; H. J. McCracken; O. Le Fevre; J. P. Picat; G. Vettolani; M. Arnaboldi; S. Arnouts; M. Bolzonella; A. Cappi; S. Charlot; L. Guzzo; B. Marano; C. Marinoni; G. Mathez; A. Mazure; B. Meneux; R. Pello; A. Pollo; L. Pozzetti M. Radovich

    2004-09-10T23:59:59.000Z

    The VIMOS VLT Deep Survey (VVDS), designed to measure 150,000 galaxy redshifts, requires a dedicated data reduction and analysis pipeline to process in a timely fashion the large amount of spectroscopic data being produced. This requirement has lead to the development of the VIMOS Interactive Pipeline and Graphical Interface (VIPGI), a new software package designed to simplify to a very high degree the task of reducing astronomical data obtained with VIMOS, the imaging spectrograph built by the VIRMOS Consortium for the European Southern Observatory, and mounted on Unit 3 (Melipal) of the Very Large Telescope (VLT) at Paranal Observatory (Chile). VIPGI provides the astronomer with specially designed VIMOS data reduction functions, a VIMOS-centric data organizer, and dedicated data browsing and plotting tools, that can be used to verify the quality and accuracy of the various stages of the data reduction process. The quality and accuracy of the data reduction pipeline are comparable to those obtained using well known IRAF tasks, but the speed of the data reduction process is significantly increased, thanks to the large set of dedicated features. In this paper we discuss the details of the MOS data reduction pipeline implemented in VIPGI, as applied to the reduction of some 20,000 VVDS spectra, assessing quantitatively the accuracy of the various reduction steps. We also provide a more general overview of VIPGI capabilities, a tool that can be used for the reduction of any kind of VIMOS data.

  10. Analysis of oil-pipeline distribution of multiple products subject to delivery time-windows 

    E-Print Network [OSTI]

    Jittamai, Phongchai

    2006-04-12T23:59:59.000Z

    This dissertation defines the operational problems of, and develops solution methodologies for, a distribution of multiple products into oil pipeline subject to delivery time-windows constraints. A multiple-product oil pipeline is a pipeline system...

  11. Analysis of oil-pipeline distribution of multiple products subject to delivery time-windows

    E-Print Network [OSTI]

    Jittamai, Phongchai

    2006-04-12T23:59:59.000Z

    This dissertation defines the operational problems of, and develops solution methodologies for, a distribution of multiple products into oil pipeline subject to delivery time-windows constraints. A multiple-product oil pipeline is a pipeline system...

  12. Natural gas pipeline technology overview.

    SciTech Connect (OSTI)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01T23:59:59.000Z

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by transmission companies. Compressor stations at required distances boost the pressure that is lost through friction as the gas moves through the steel pipes (EPA 2000). The natural gas system is generally described in terms of production, processing and purification, transmission and storage, and distribution (NaturalGas.org 2004b). Figure 1.1-2 shows a schematic of the system through transmission. This report focuses on the transmission pipeline, compressor stations, and city gates.

  13. PIPELINES AS COMMUNICATION NETWORK LINKS

    SciTech Connect (OSTI)

    Kelvin T. Erickson; Ann Miller; E. Keith Stanek; C.H. Wu; Shari Dunn-Norman

    2005-03-14T23:59:59.000Z

    This report presents the results of an investigation into two methods of using the natural gas pipeline as a communication medium. The work addressed the need to develop secure system monitoring and control techniques between the field and control centers and to robotic devices in the pipeline. In the first method, the pipeline was treated as a microwave waveguide. In the second method, the pipe was treated as a leaky feeder or a multi-ground neutral and the signal was directly injected onto the metal pipe. These methods were tested on existing pipeline loops at UMR and Batelle. The results reported in this report indicate the feasibility of both methods. In addition, a few suitable communication link protocols for this network were analyzed.

  14. Pipeline Processing of VLBI Data

    E-Print Network [OSTI]

    C. Reynolds; Z. Paragi; M. Garrett

    2002-05-08T23:59:59.000Z

    As part of an on-going effort to simplify the data analysis path for VLBI experiments, a pipeline procedure has been developed at JIVE to carry out much of the data reduction required for EVN experiments in an automated fashion. This pipeline procedure runs entirely within AIPS, the standard data reduction package used in astronomical VLBI, and is used to provide preliminary calibration of EVN experiments correlated at the EVN MkIV data processor. As well as simplifying the analysis for EVN users, the pipeline reduces the delay in providing information on the data quality to participating telescopes, hence improving the overall performance of the array. A description of this pipeline is presented here.

  15. Instrumented Pipeline Initiative

    SciTech Connect (OSTI)

    Thomas Piro; Michael Ream

    2010-07-31T23:59:59.000Z

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  16. Statistical Modeling of Corrosion Failures in Natural Gas Transmission Pipelines

    E-Print Network [OSTI]

    Cobanoglu, Mustafa Murat

    2014-03-28T23:59:59.000Z

    and deterioration processes in pipeline networks. Therefore, pipeline operators need to rethink their corrosion prevention strategies. These results of corrosion failures are forcing the companies to develop accurate maintenance models based on failure frequency...

  17. Report of the Committee on oil pipeline regulation

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    Safety, interpretations of FERC Opinion 154-B, and a variation on the theme of oil pipeline deregulation were the significant developments affecting oil pipelines in the year 1991 and early 1992. The introduction of amendments to the Hazardous Liquid Pipeline Safety Act will result in Department of Transportation Regulations concerning in-depth reporting requirements of pipeline incidents and more frequent testing procedures to insure the safety of the pipeline. In November, 1991, Congressman Synar introduced a bill to streamline Federal Energy Regulatory Commission (FERC) procedures concerning oil pipelines.

  18. GLAST (FERMI) Data-Processing Pipeline

    SciTech Connect (OSTI)

    Flath, Daniel L.; Johnson, Tony S.; Turri, Massimiliano; Heidenreich, Karen A.; /SLAC

    2011-08-12T23:59:59.000Z

    The Data Processing Pipeline ('Pipeline') has been developed for the Gamma-Ray Large Area Space Telescope (GLAST) which launched June 11, 2008. It generically processes graphs of dependent tasks, maintaining a full record of its state, history and data products. The Pipeline is used to automatically process the data down-linked from the satellite and to deliver science products to the GLAST collaboration and the Science Support Center and has been in continuous use since launch with great success. The pipeline handles up to 2000 concurrent jobs and in reconstructing science data produces approximately 750GB of data products using 1/2 CPU-year of processing time per day.

  19. Discussion on Article1: A Mori Perspective on Bicultural Software Development

    E-Print Network [OSTI]

    Keegan, Te Taka

    's about treating people with respect, of raising their importance and needs above yours, of looking after their health and well being often to the detriment of your own needs. I believe it goes further than the treasure of discussion and the dissemination of knowledge is given its due importance and protection

  20. Components in the Pipeline

    SciTech Connect (OSTI)

    Gorton, Ian; Wynne, Adam S.; Liu, Yan (Jenny); Yin, Jian

    2011-02-24T23:59:59.000Z

    Scientists commonly describe their data processing systems metaphorically as software pipelines. These pipelines input one or more data sources and apply a sequence of processing steps to transform the data and create useful results. While conceptually simple, pipelines often adopt complex topologies and must meet stringent quality of service requirements that place stress on the software infrastructure used to construct the pipeline. In this paper we describe the MeDICi Integration Framework, which is a component-based framework for constructing complex software pipelines. The framework supports composing pipelines from distributed heterogeneous software components and provides mechanisms for controlling qualities of service to meet demanding performance, reliability and communication requirements.

  1. Pipeline Safety Rule (Tennessee)

    Broader source: Energy.gov [DOE]

    The Pipeline Safety Rule simply states, "The Minimum Federal Safety Standards for the transportation of natural and other gas by pipeline (Title 49, Chapter 1, Part 192) as published in the Federal...

  2. Pipeline Construction Guidelines (Indiana)

    Broader source: Energy.gov [DOE]

    The Division of Pipeline Safety of the Indiana Utility Regulatory Commission regulates the construction of any segment of an interstate pipeline on privately owned land in Indiana. The division has...

  3. Keystone XL pipeline update

    Broader source: Energy.gov [DOE]

    Questions have been raised recently about the Keystone XL pipeline project, so we wanted to make some points clear.

  4. Genome-wide SNP discovery in walnut with an AGSNP pipeline updated for SNP discovery in allogamous organisms

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    in walnut with an AGSNP pipeline updated for SNP discoveryin walnut with an AGSNP pipeline updated for SNP discoverythe development of a pipeline (AGSNP) for genome-wide SNP

  5. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

  6. New regulatory environment changing pipeline operations

    SciTech Connect (OSTI)

    Fields, J.H. (Northwest Pipeline Corp., Salt Lake City, UT (United States))

    1994-04-01T23:59:59.000Z

    This paper reviews the effects of deregulation of the natural gas and pipeline industry as a result of the Federal Energy Regulatory Commission's Orders 436, 500, and 636. It describes the changes as they affected Northwest Pipeline's structure and marketing strategies as the company had to move from a gas merchandiser to a gas transporter. It describes the capacity release options of the pipeline which allow the customers to buy, release, and renegotiate prices whenever they need to because of an increase or decrease in demand using current market prices. The paper discusses the natural gas distribution system which has evolved as a result of these regulations.

  7. Overview of pipeline safety legislation

    SciTech Connect (OSTI)

    Caldwell, J. [Caldwell and Associates, Arlington, VA (United States)

    1995-12-31T23:59:59.000Z

    Pipeline regulation in the US as it has been known since 1968 is being changed. Several major actions are occurring in Government that will redirect the focus of pipeline safety regulation and how it is carried out by government and industry. The Congress is proposing to accept risk management as away of regulation and requiring risk assessment and cost analysis on all regulatory requirements. The DOT/OPS is developing a risk-prioritization program for regulatory activities to be used in evaluating existing regulations to identify those that are obsolete and need modifying or eliminating. The pipeline industry is taking on a proactive role in working with Congress and DOT/OPS to develop this agenda. For the first time in the regulatory history of pipeline safety, Congress, DOT/OPS, and the industry are talking to each other and working toward a common goal of less regulation, more flexible regulation, and placing the responsibility for safety in the hands of the industry.

  8. Cathodic protection retrofit of an offshore pipeline

    SciTech Connect (OSTI)

    Winters, R.H.; Holk, A.C. [Tenneco Energy, Houston, TX (United States)

    1997-09-01T23:59:59.000Z

    The cathodic protection anodes and corrosion coating on two 8-inch (203.2 mm) outside diameter (O.D.) offshore pipelines were damaged during deep water ({minus}380 feet, {minus}116 m) installation. In-situ methods for deep water inspection and repair of the pipelines` cathodic protection and coating systems were developed and performed. Methods are described in which underwater anode retrofits were performed and friction welding technology was used to re-attach anode leads. Standard procedures for underwater pipeline coating repair and remediation of damaged line pipe are provided.

  9. Regulation changes create opportunities for pipeline manufacturers

    SciTech Connect (OSTI)

    Santon, J.

    1999-09-01T23:59:59.000Z

    The US Department of Transportation`s (DOT) Research and Special Programs Administration (RSPA) is proposing to change its safety standards for the repair of corroded or damaged steel pipe in gas and hazardous liquid pipelines. For pipeline operators, the expected revisions will allow new flexibility in approaches to pipeline repair. Less costly and less disruptive procedures will be acceptable. For manufacturers, the changes will open opportunities for development of corrosion repair technology. A highly competitive market in new repair technology can be expected to arise. Current regulations, new technologies, and proposed safety standards are described.

  10. alaska oil pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied Oil Spill Research & Development Program Electronic Bibliography 1998-01-01 24 Hydrogen Pipeline Safety Our goal is to establish the codes and standards necessary...

  11. Pipeline Safety (Pennsylvania)

    Broader source: Energy.gov [DOE]

    The Pennsylvania legislature has empowered the Public Utility Commission to direct and enforce safety standards for pipeline facilities and to regulate safety practices of certificated utilities...

  12. EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline...

    U.S. Energy Information Administration (EIA) Indexed Site

    Interstate Pipelines Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Thirty Largest U.S. Interstate Natural...

  13. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12T23:59:59.000Z

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.

  14. Natural Gas Pipeline Safety (Kansas)

    Broader source: Energy.gov [DOE]

    This article states minimum safety standards for the transportation of natural gas by pipeline and reporting requirements for operators of pipelines.

  15. Review and discussion of the development of synthetic aperture focusing technique for ultrasonic testing (SAFT-UT)

    SciTech Connect (OSTI)

    Busse, L J; Collins, H D; Doctor, S R

    1984-03-01T23:59:59.000Z

    The development and capabilities of synthetic aperture focusing techniques for ultrasonic testing (SAFT-UT) are presented. The purpose of SAFT-UT is to produce high-resolution images of the interior of opaque objects. The goal of this work is to develop and implement methods which can be used to detect and to quantify the extent of defects and cracks in critical components of nuclear reactors (pressure vessels, primary piping systems, and nozzles). This report places particular emphasis upon the practical experimental results that have been obtained using SAFT-UT as well as the theoretical background that underlies synthetic aperture focusing. A discussion regarding high-speed and real-time implementations of two- and three-dimensional synthetic aperture focusing is also presented.

  16. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  17. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

  18. MICROSTRUCTURE AND MECHANICAL PROPERTY PERFORMANCE OF COMMERCIAL GRADE API PIPELINE STEELS IN HIGH PRESSURE GASEOUS HYDROGEN

    SciTech Connect (OSTI)

    Stalheim, Mr. Douglas [DGS Metallurgical Solutions Inc; Boggess, Todd [Secat; San Marchi, Chris [Sandia National Laboratories (SNL); Jansto, Steven [Reference Metals Company; Somerday, Dr. B [Sandia National Laboratories (SNL); Muralidharan, Govindarajan [ORNL; Sofronis, Prof. Petros [University of Illinois

    2010-01-01T23:59:59.000Z

    The continued growth of the world s developing countries has placed an ever increasing demand on traditional fossil fuel energy sources. This development has lead to increasing research and development of alternative energy sources. Hydrogen gas is one of the potential alternative energy sources under development. Currently the most economical method of transporting large quantities of hydrogen gas is through steel pipelines. It is well known that hydrogen embrittlement has the potential to degrade steel s mechanical properties when hydrogen migrates into the steel matrix. Consequently, the current pipeline infrastructure used in hydrogen transport is typically operated in a conservative fashion. This operational practice is not conducive to economical movement of significant volumes of hydrogen gas as an alternative to fossil fuels. The degradation of the mechanical properties of steels in hydrogen service is known to depend on the microstructure of the steel. Understanding the levels of mechanical property degradation of a given microstructure when exposed to hydrogen gas under pressure can be used to evaluate the suitability of the existing pipeline infrastructure for hydrogen service and guide alloy and microstructure design for new hydrogen pipeline infrastructure. To this end, the 2 Copyright 2010 by ASME microstructures of relevant steels and their mechanical properties in relevant gaseous hydrogen environments must be fully characterized to establish suitability for transporting hydrogen. A project to evaluate four commercially available pipeline steels alloy/microstructure performance in the presences of gaseous hydrogen has been funded by the US Department of Energy along with the private sector. The microstructures of four pipeline steels were characterized and then tensile testing was conducted in gaseous hydrogen and helium at pressures of 800, 1600 and 3000 psi. Based on measurements of reduction of area, two of the four steels that performed the best across the pressure range were selected for evaluation of fracture and fatigue performance in gaseous hydrogen at 800 and 3000 psi. This paper will describe the work performed on four commercially available pipeline steels in the presence of gaseous hydrogen at pressures relevant for transport in pipelines. Microstructures and mechanical property performances will be compared. In addition, recommendations for future work related to gaining a better understanding of steel pipeline performance in hydrogen service will be discussed.

  19. BP and Hydrogen Pipelines DOE Hydrogen Pipeline Working Group Workshop

    E-Print Network [OSTI]

    efforts were undertaken ˇ Conversion took place during a period of less regulation on pipeline activityBP and Hydrogen Pipelines DOE Hydrogen Pipeline Working Group Workshop August 30-31, 2005 Gary P ˇ UK partnership opened the first hydrogen demonstration refueling station ˇ Two hydrogen pipelines

  20. Flow of suspensions in pipelines

    SciTech Connect (OSTI)

    Nasr-El-Din, H.A. [Laboratory R& D Center, Saudi Aramco, Dhahran (Saudi Arabia)

    1996-12-31T23:59:59.000Z

    Slurry pipelines are used in many industrial applications. Several parameters are often needed by the operator, including critical deposit velocity, solids concentration, and particle velocity profiles. This chapter first reviews important formulas used to predict critical deposit velocity both in Newtonian and non-Newtonian (power-law) carrier fluids. Various methods to measure local velocity and solids concentration profiles in slurry pipelines are discussed. Local solids concentration can be measured by sample withdrawal technique. However, the sample should be withdrawn at isokinetic conditions. Sampling downstream of tees and elbows can result in significant errors in measuring solids concentration. Gamma-ray absorption methods can be used; however, two scans are needed to obtain local solids concentration. Bulk velocity of conductive slurries can be obtained using magnetic flow meters mounted on a vertical section of the pipe. Local particle velocity can be obtained using conductivity probes. NMR methods can be used to measure concentration and particle velocity profiles but are limited to small-diameter pipes. Vertical solids concentration of coarse slurries flowing in a horizontal pipeline exhibits a positive gradient near the bottom of the pipe. Traditional models to predict these profiles are given, and new mathematical models and computer software to determine these profiles are introduced. 104 refs., 31 figs., 1 tab.

  1. Composites Technology for Hydrogen Pipelines

    E-Print Network [OSTI]

    Composites Technology for Hydrogen Pipelines Barton Smith, Barbara Frame, Larry Anovitz and Cliff;Composites Technology for Hydrogen Pipelines Fiber-reinforced polymer pipe Project Overview: Investigate of pipeline per day. ¡ $190k/mile capital cost for distribution pipelines ¡ Hydrogen delivery cost below $1

  2. GAS PIPELINE PIGABILITY

    SciTech Connect (OSTI)

    Ted Clark; Bruce Nestleroth

    2004-04-01T23:59:59.000Z

    In-line inspection equipment is commonly used to examine a large portion of the long distance transmission pipeline system that transports natural gas from well gathering points to local distribution companies. A piece of equipment that is inserted into a pipeline and driven by product flow is called a ''pig''. Using this term as a base, a set of terms has evolved. Pigs that are equipped with sensors and data recording devices are called ''intelligent pigs''. Pipelines that cannot be inspected using intelligent pigs are deemed ''unpigable''. But many factors affect the passage of a pig through a pipeline, or the ''pigability''. The pigability pipeline extend well beyond the basic need for a long round hole with a means to enter and exit. An accurate assessment of pigability includes consideration of pipeline length, attributes, pressure, flow rate, deformation, cleanliness, and other factors as well as the availability of inspection technology. All factors must be considered when assessing the appropriateness of ILI to assess specific pipeline threats.

  3. Analytic prognostic for petrochemical pipelines

    E-Print Network [OSTI]

    Jaoude, Abdo Abou; El-Tawil, Khaled; Noura, Hassan; Ouladsine, Mustapha

    2012-01-01T23:59:59.000Z

    Pipelines tubes are part of vital mechanical systems largely used in petrochemical industries. They serve to transport natural gases or liquids. They are cylindrical tubes and are submitted to the risks of corrosion due to high PH concentrations of the transported liquids in addition to fatigue cracks due to the alternation of pressure-depression of gas along the time, initiating therefore in the tubes body micro-cracks that can propagate abruptly to lead to failure. The development of the prognostic process for such systems increases largely their performance and their availability, as well decreases the global cost of their missions. Therefore, this paper deals with a new prognostic approach to improve the performance of these pipelines. Only the first mode of crack, that is, the opening mode, is considered.

  4. Analytic prognostic for petrochemical pipelines

    E-Print Network [OSTI]

    Abdo Abou Jaoude; Seifedine Kadry; Khaled El-Tawil; Hassan Noura; Mustapha Ouladsine

    2012-12-25T23:59:59.000Z

    Pipelines tubes are part of vital mechanical systems largely used in petrochemical industries. They serve to transport natural gases or liquids. They are cylindrical tubes and are submitted to the risks of corrosion due to high PH concentrations of the transported liquids in addition to fatigue cracks due to the alternation of pressure-depression of gas along the time, initiating therefore in the tubes body micro-cracks that can propagate abruptly to lead to failure. The development of the prognostic process for such systems increases largely their performance and their availability, as well decreases the global cost of their missions. Therefore, this paper deals with a new prognostic approach to improve the performance of these pipelines. Only the first mode of crack, that is, the opening mode, is considered.

  5. SAPAC: a SBF analysis pipeline for the astronomical community

    E-Print Network [OSTI]

    Laura P. Dunn; Helmut Jerjen

    2005-08-01T23:59:59.000Z

    Large volumes of CCD imaging data that will become available from wide-field cameras at telescopes such as the CFHT, SUBARU, VST, or VISTA in the near future are highly suitable for systematic distance surveys of early-type galaxies using the Surface Brightness Fluctuation (SBF) method. For the efficient processing of such large data sets, we are developing the first semi-automatic SBF analysis pipeline named SAPAC. After a brief description of the SBF method we discuss the image quality needed for a successful distance measurement and give some background information on SAPAC

  6. Leaving the Premedical Pipeline at Cal

    E-Print Network [OSTI]

    Kwan, Elizabeth

    2001-01-01T23:59:59.000Z

    Why students drop out of the pipeline to health professionsLeaving the Premedical Pipeline at Cal By Elizabeth Kwanattrition from the premedical pipeline is appropriate. Not

  7. Capturing Latino Students in the Academic Pipeline

    E-Print Network [OSTI]

    Gándara, Patricia; Larson, Katherine; Mehan, Hugh; Rumberger, Russell

    1998-01-01T23:59:59.000Z

    The Latino Educational Pipeline Why Latino Students are atSTUDENTS IN THE ACADEMIC PIPELINE CAPTURING LATINO STUDENTSIN THE ACADEMIC PIPELINE Patricia Gcindara, Editor Katherine

  8. Pipeline Carriers (Montana)

    Broader source: Energy.gov [DOE]

    Pipeline carriers transporting crude petroleum, coal, the products of crude petroleum or coal, or carbon dioxide produced in the combustion or gasification of fossil fuels are required to abide by...

  9. Gas Pipelines (Texas)

    Broader source: Energy.gov [DOE]

    This chapter applies to any entity that owns, manages, operates, leases, or controls a pipeline for the purpose of transporting natural gas in the state for sale or compensation, as well as any...

  10. Gas Pipeline Securities (Indiana)

    Broader source: Energy.gov [DOE]

    This statute establishes that entities engaged in the transmission of gas by pipelines are not required to obtain the consent of the Utility Regulatory Commission for issuance of stocks,...

  11. Exotic drilling: contractor drills pipelines

    SciTech Connect (OSTI)

    McReynolds, L.

    1980-04-01T23:59:59.000Z

    Drilling of pipelines has been technologically developed for applications such as river crossings, tunnelling through tar-sand or oil-shale strata for more effective in situ combustion production projects, and drilling inside rather than through heavy oil pays to create extensive horizontal well bores suitable for steam heating the formation. The horizontal drilling concept for river crossing involves installation of pipelines in an inverted arc 25 to 100 ft below a river bed. The directional control required to produce a curved hole is maintained by rotating the bit without rotating the pipe. When the drill string is activated by a forward thrust, it creates a reactive subsurface pressure against the front surface of the bent sub, thus causing the bend. The bit then deviates in the direction of the bend. Little disruption of the environment occurs, and the directionally drilled crossings offer improved pipeline security, maintenance of year-round construction schedules, easier permitting, no navigational hazards or interruption for waterway traffic, elimination of bank restoration costs and most repair costs, and a maintenance-free crossing section.

  12. Intelligent scraping experience using ultrasonics in two 60in./56in. dual diameter 100 km seawater transmission pipelines in Saudi Arabia

    SciTech Connect (OSTI)

    Bird, A.F.; Chu, K.S.

    1995-10-01T23:59:59.000Z

    Saudi ARAMCO`s two 60in./56in. (1524/1422 mm) diameter Seawater Injection Pipelines used for secondary oil recovery stretch from the Seawater Treatment Plant across the Arabian Desert for a distance of approximately 100 kilometers. Both lines were put into operation in mid 1978 using over the ditch Plicoflex tape wrap as a means of protection against external corrosion. A significant portion of both pipelines (32 km of each line) runs through Subkha (salty moist) areas. A series of test hole evaluations in 1989 indicated moderate to sever external corrosion particularly in Subkha which necessitated sleeving and external coating application. In 1991 a series of leaks, four (4) in total over a period of two (2) months occurred in Pipeline {number_sign}2 due to external corrosion. This suggested that the line(s) were in urgent need of at least partial replacement or major rehabilitation. Prior to making a final decision on partial replacement it was decided to run an Intelligent Scraper in both pipelines to ascertain both internal and external pipeline conditions. An Ultrasonic Scraper the largest of it`s kind in the world, similar to what was used in the Alyeska Pipeline was developed and successfully run in both pipelines in February 1993. This paper discusses the pipeline history, test hole evaluations, Intelligent Scraping experiences, field evaluation for anomaly verification, and repair of approximately 120 locations as identified by the Intelligent Scraping run. The Intelligent Scraping evaluation played a major role in the cancellation of partial pipeline replacement with cost savings estimated $30 MM.

  13. Localized Pipeline Encroachment Detector System Using Sensor Network 

    E-Print Network [OSTI]

    Ou, Xiaoxi 1986-

    2011-08-08T23:59:59.000Z

    Detection of encroachment on pipeline right-of-way is important for pipeline safety. An effective system can provide on-time warning while reducing the probability of false alarms. There are a number of industry and academic developments to tackle...

  14. Pipeline Safety Program Oak Ridge National Laboratory

    E-Print Network [OSTI]

    programs prepared by pipeline operators in accordance with Federal pipeline safety regulations, grounding, and interference, ˇ environmentally sensitive areas, ˇ federal pipeline safety regulationsPipeline Safety Program Oak Ridge National Laboratory managed by UT-Battelle, LLC for the U

  15. REAL-TIME ACTIVE PIPELINE INTEGRITY DETECTION (RAPID) SYSTEM FOR CORROSION DETECTION AND QUANTIFICATION

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    alone there are over 2 million miles of natural gas transmission and distribution pipeline providing 24REAL-TIME ACTIVE PIPELINE INTEGRITY DETECTION (RAPID) SYSTEM FOR CORROSION DETECTION detection Acellent has developed a Real-time Active Pipeline Integrity Detection (RAPID) system. The RAPID

  16. Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test

    SciTech Connect (OSTI)

    Wang, Jy-An John [ORNL; Tan, Ting [ORNL; Jiang, Hao [ORNL; Zhang, Wei [ORNL; Feng, Zhili [ORNL

    2012-10-01T23:59:59.000Z

    The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

  17. Gas Pipeline Safety (West Virginia)

    Broader source: Energy.gov [DOE]

    The Gas Pipeline Safety Section of the Engineering Division is responsible for the application and enforcement of pipeline safety regulations under Chapter 24B of the West Virginia Code and 49 U.S...

  18. Programmable Graphics Pipelines Anjul Patney

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    Programmable Graphics Pipelines By Anjul Patney B.Tech. (Indian Institute of Technology Delhi) 2007 as Abstractions for Computer Graphics 5 2.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2.2 Modern Graphics Pipelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 2

  19. CASE CRITICAL Keystone XL Pipeline

    E-Print Network [OSTI]

    Hall, Sharon J.

    CASE CRITICAL Keystone XL Pipeline: A Line in the Sand? Case Critical is presented by ASU's Global Professor, ASU's School of Geographical Sciences and Urban Planning The Keystone XL Pipeline, a large

  20. PID control of gas pipelines

    SciTech Connect (OSTI)

    Coltharp, B.; Bergmann, J. [Baker CAC, Kingwood, TX (United States)

    1996-09-01T23:59:59.000Z

    The use of low cost digital controllers for pipeline control is increasing as the reliability and cost improves. In pipeline applications, the proportional, integral, and derivative (PID) controller algorithm is often used. However, the unique problems associated with pipeline operation have caused manufacturers to modify the basic control algorithms. Features such as set point ramping, built in pressure control, freeze on input error, and high and low output limits help assure safe and predictable pipeline operation.

  1. Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs

    E-Print Network [OSTI]

    Parker, Nathan

    2004-01-01T23:59:59.000Z

    future estimates of hydrogen pipelines. Construction Cost (does this mean for hydrogen pipelines? The objective of thisinto the cost of hydrogen pipelines. To this end I will

  2. Mobile sensor network to monitor wastewater collection pipelines

    E-Print Network [OSTI]

    Lim, Jungsoo

    2012-01-01T23:59:59.000Z

    Advanced pipeline monitoringDesign of mobile pipeline floating sensor “SewerSnortIllustration of mobile pipeline floating sensor monitoring

  3. Data-stationary pipelined machine

    SciTech Connect (OSTI)

    Abdou, I.E.

    1984-01-01T23:59:59.000Z

    The paper presents the data-stationary control concept of pipelined machines, with emphasis on its application in image processing systems. A parallel array of pipelined machines for image processing is considered, and data-stationary control is compared with time-stationary control. A system is proposed that is a parallel array of pipelined machines. Each pipeline is a multifunctional, statically configured, data-stationary device. The pipelines do not accommodate branching instructions or interrupts, and the design focus on vector processing only. The system can be used in other applications such as signal processing and arithmetic number crunching. 5 references.

  4. Program permits fast solution to pipeline loop requirements

    SciTech Connect (OSTI)

    Bierman, G.D.

    1983-10-31T23:59:59.000Z

    A program developed for the HP-41CV hand-held calculator can provide pipeline engineers with a quick and easy means for determining loop requirements on existing gas-transmission pipelines. Adding pipe in parallel to an existing pipeline, referred to as looping, is necessary to insure that with a given flow rate, the gas will arrive at a certain point on the pipeline with a pressure equal to or greater than the minimum required pressure. The automatic loop program calculates loop by first determining the total number of segments which require looping within the section of pipeline being evaluated. A section of pipe is usually the pipeline between compressor stations and is divided into segments by either receipt or delivery points along the pipeline. The number of segments which require looping is found by adding loop to individual segments until the final pressure (i.e., the pressure at the point of interest downstream on the pipeline) is equal to or greater than the specified design pressure.

  5. Enhancing protection for unusually sensitive ecological areas from pipeline releases

    E-Print Network [OSTI]

    Sames, Christina; Fink, Dennis

    2001-01-01T23:59:59.000Z

    ECOLOGICAL AREAS FROM PIPELINE RELEASES Christina Sames;Administration, Office of Pipeline Safety, DPS-10/ 400 7thof a hazardous liquid pipeline accident. Pipeline operators

  6. Innovative Electromagnetic Sensors for Pipeline Crawlers

    SciTech Connect (OSTI)

    J. Bruce Nestleroth

    2006-05-04T23:59:59.000Z

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. Battelle is in the final year on a projected three-year development effort. In the first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. The second inspection methodology is based on rotating permanent magnets. The rotating exciter unit produces strong eddy currents in the pipe wall. At distances of a pipe diameter or more from the rotating exciter, the currents flow circumferentially. These circumferential currents are deflected by pipeline defects such as corrosion and axially aligned cracks. Simple sensors are used to detect the change in current densities in the pipe wall. The second semiannual report on this project reported on experimental and modeling results. The results showed that the rotating system was more adaptable to pipeline inspection and therefore only this system will be carried into the second year of the sensor development. In the third reporting period, the rotating system inspection was further developed. Since this is a new inspection modality without published fundamentals to build upon, basic analytical and experimental investigations were performed. A closed form equation for designing rotating exciters and positioning sensors was derived from fundamental principles. Also signal processing methods were investigated for detection and assessment of pipeline anomalies. A lock in amplifier approach was chosen as the method for detecting the signals. Finally, mechanical implementations for passing tight restrictions such as plug valves were investigated. This inspection concept is new and unique; a United States patent application has been submitted. In this reporting period, a general design of the rotating permanent magnet inspection system is presented. The rotating permanent magnet inspection system is feasible for pipes ranging in diameter from 8 to 18 inches using a two pole configuration. Experimental results and theoretical calculations provide the basis for selection of the critical design parameters. The parameters include a significant magnet to pipe separation that will facilitate the passage of pipeline features. With the basic values of critical components established, the next step is a detailed mechanical design of a pipeline ready inspection system.

  7. Response of continuous pipelines to tunnel induced ground deformations

    E-Print Network [OSTI]

    Ieronymaki, Evangelia S

    2011-01-01T23:59:59.000Z

    This thesis develops analytical solutions for estimating the bending moments and axial loads in a buried pipeline due to ground movements caused by tunnel construction in soft ground. The solutions combine closed-form, ...

  8. DOE Hydrogen Pipeline Working Group Workshop

    E-Print Network [OSTI]

    Laporte, TX to near Lake Charles, LA. This system has approximately 228 miles of DOT regulated H2 pipeline of DOT regulated H2 pipeline. Portions of this system operating since early 1983. Pipeline sizeDOE Hydrogen Pipeline Working Group Workshop August 31, 2005 Augusta, Georgia #12;Hydrogen Pipeline

  9. Second generation heliostat development detailed design report. Volume I. Technical discussion. Period covered: July 16, 1979-April 30, 1980

    SciTech Connect (OSTI)

    Not Available

    1980-01-01T23:59:59.000Z

    Presented are the design of the second generation heliostat, the development of the manufacturing plan, the method of transporting the heliostats from the factory to the installation site, heliostat installation procedures, and the maintenance routines. These plans are then cost estimated to provide inputs required to develop the installed cost of the heliostat and further, the cost of owning, operating and maintaining a collector field. It is a dual axis tracking heliostat with a central pedestal mount. The normal show position is vertical but under anticipated extreme high wind conditions it is driven to a horizontal orientation with the reflective surfaces facing up. The gross face area of the heliostat is approximately 25 feet by 25 feet. Due to mirror module spacing and edge treatment the net reflective area is 568 square feet or 52.8 square meters. Each mirror module is nominally 4 feet by 12 feet with a 3 inch depth. Twelve modules comprise the mirror array for each heliostat. The mirror support rack consists of open roof-type trusses which are combined with tubular members which connect to the drive unit. The drive unit is gear-driven with separate motors and gear systems for azimuth and elevation. The foundation for the drive consists of a one-piece cylindrical pipe which is driven into the soil at the site by conventional pile-driving techniques. (WHK)

  10. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    SciTech Connect (OSTI)

    Mattiozzi, Pierpaolo [Snamprogetti-Saipem, Via Toniolo, 1, 61032 Fano (Italy); Strom, Alexander [Institute of Geospheres Dynamics, Leninskiy Avenue, 38, Building 1, 119334, Moscow (Russian Federation)

    2008-07-08T23:59:59.000Z

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures.

  11. New system pinpoints leaks in ethylene pipeline

    SciTech Connect (OSTI)

    Hamande, A. [Solvay et Cie, Jemeppe sur Sambre (Belgium); Condacse, V.; Modisette, J. [Modisette Associates, Inc., Houston, TX (United States)

    1995-04-01T23:59:59.000Z

    A model-based leak detection, PLDS, developed by Modisette Associates, Inc., Houston has been operating on the Solvay et Cie ethylene pipeline since 1989. The 6-in. pipeline extends from Antwerp to Jemeppe sur Sambre, a distance of 73.5 miles and is buried at a depth of 3 ft. with no insulation. Except for outlets to flares, located every 6 miles for test purposes, there are no injections or deliveries along the pipeline. Also, there are block valves, which are normally open, at each flare location. This paper reviews the design and testing procedures used to determine the system performance. These tests showed that the leak system was fully operational and no false alarms were caused by abrupt changes in inlet/outlet flows of the pipeline. It was confirmed that leaks larger than 2 tonnes/hr. (40 bbl/hr) are quickly detected and accurately located. Also, maximum leak detection sensitivity is 1 tonne/hr. (20 bbl/hr) with a detection time of one hour. Significant operational, configuration, and programming issues also were found during the testing program. Data showed that temperature simulations needed re-examining for improvement since accurate temperature measurements are important. This is especially true for ethylene since its density depends largely on temperature. Another finding showed the averaging period of 4 hrs. was too long and a 1 to 2 hr. interval was better.

  12. Hydrodynamic forces on piggyback pipelines

    SciTech Connect (OSTI)

    Jakobsen, M.L.; Sayer, P. [Univ. of Strathclyde, Glasgow (United Kingdom)

    1995-12-31T23:59:59.000Z

    An increasing number of new offshore pipelines have been designed as bundles, mainly because of overall cost reductions. One popular way of combining two pipelines with different diameters is the piggyback configuration, with the smaller pipeline strapped on top of the main pipeline. The external hydrodynamic forces on this combination are at present very roughly estimated; pipeline engineers need more data to support their designs. This paper presents experimental results for the in-line hydrodynamic loading on three different piggyback set-ups. The models comprised a 0.4 m main pipeline, and three piggyback pipelines with diameters of 0.038 m, 0.059 m and 0.099 m. Each small pipeline was separately mounted to the main pipeline, with a gap equal to its own diameter. These model sizes lie approximately between half- and full-scale. Experiments were undertaken for K{sub C} between 5 and 42, and R{sub e} in the range 0.0 * 10{sup 4} to 8.5 * 10{sup 5}. The results based on Morison`s equation indicate that a simple addition of the separate forces acting on each cylinder underestimates the actual force by up to 35% at low K{sub C} (< {approximately} 10) and by as much as 100% in the drag-dominated regime (K{sub C} > {approximately} 20).

  13. RNA-Seq Pipeline in Galaxy

    E-Print Network [OSTI]

    Meng, Xiandong

    2014-01-01T23:59:59.000Z

    Assembly in Galaxy RNA-Seq q Pipeline p • QC : To find outRNA-Seq Pipeline in Galaxy Xiandong Meng 1 , Jeffrey Martinof California RNA--Seq Pipeline in Galaxy RNA Xiandong Meng

  14. Leaking Pipelines: Doctoral Student Family Formation

    E-Print Network [OSTI]

    Serrano, Christyna M.

    2008-01-01T23:59:59.000Z

    Sari M. “Why the Academic Pipeline Leaks: Fewer Men thanone reason the academic pipeline leaks. 31 Blair-Loy, Mary.to leak out of the “academic pipeline. ” The term “academic

  15. Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System

    SciTech Connect (OSTI)

    Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

    2005-06-01T23:59:59.000Z

    The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

  16. Report of the Committee on oil pipeline regulation

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    This report of the Committee on Oil Pipeline Regulations is divided into five sections. Section I addresses Order 561, a final rule entitled [open quotes]Revisions to Oil Pipeline Regulations Pursuant to the Energy Policy Act of 1992,[close quotes] which was released by the Federal Energy Regulatory Commission (FERC) on October 23, 1993. Section II discusses the question of FERC jurisdiction over partial abandments of service, focusing on the ARCO Pipe Line Co. case which centered on whether a pipeline may discontinue shipping in one direction even though the pipeline will continue to ship in another direction, and the Chevron Pipe Line Co. case in which the Commission ruled that it does not have the authority to prevent a pipeline from temporarily suspending service. Section II addresses the Lakehead Pipe Line Co., Ltd. Partnership case, in which the Administrative Law Judge issued an Initial Decision resolving Phase I issues. Section IV of the article discusses whether or not a pipeline may base its rates on the cost of leasing capacity from an other pipeline. Five cases are examined in which pipelines that proposed initial rates allegedly based on the cost of a lease found their tariffs protested. Section V reviews the matter of the Williams Pipe Line Co. rate case in which the Commission issued an order on complaint in which it granted in part and denied in part several shippers' request for an order directing Williams Pipe Line Co. to (1) cease levying unauthorized charges, (2) pay reparations to shippers, and (3) be subjected to sanction for violations of the Interstate Commerce Act.

  17. Hydrogen Delivery Pipeline Working Group Workshop September 25-26, 2007 Center for Hydrogen Research, Aiken, GA

    E-Print Network [OSTI]

    Hydrogen Delivery Pipeline Working Group Workshop September 25-26, 2007 Center for Hydrogen..................................................................................................... 1. Introduction The DOE Hydrogen Pipeline Working Group (PWG) met on September 25-26, 2007 challenges and future goals for hydrogen pipeline research and development (R&D). One of the near-term goals

  18. DEVELOPMENT OF A PILED-FOUNDATION MODEL The models discussed in Chapter 3 illustrated the importance of modelling a building's foundation

    E-Print Network [OSTI]

    Talbot, James P.

    85 Chapter 4 DEVELOPMENT OF A PILED-FOUNDATION MODEL The models discussed in Chapter 3 illustrated-isolation. It was concluded that a generic base- isolated building model requires a comprehensive model of a piled foundation of the pile head due to longitudinal and transverse motion of the pile; ˇ interaction between neighbouring

  19. Detection of the internal corrosion in pipeline

    E-Print Network [OSTI]

    2006-10-17T23:59:59.000Z

    Detection of the internal corrosion in pipeline. Hyeonbae Kang. In this talk I will explain our new methods to detect internal corrosions in pipelines.

  20. Machinist Pipeline/Apprentice Program Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Machinist PipelineApprentice Program Program Description The Machinist Pipeline Program was created by the Prototype Fabrication Division to fill a critical need for skilled...

  1. EIS-0152: Iroquois, Tenn. Phase I, Pipeline Line Project

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to asses the environmental impacts of constructing and operating an interstate natural gas pipeline and associated infrastructure to transport gas from Canada and domestic sources to the New England Market, as proposed by the Iroquois Gas Transmission System and the Tennessee Gas Pipeline Company. The U.S. Department of Energy Office of Fossil Energy was a cooperating agency during statement development and adopted the statement on 9/1/1990.

  2. EIS-0152: Iroquois/Tennessee Phase I Pipeline Project

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to asses the environmental impacts of constructing and operating an interstate natural gas pipeline and associated infrastructure to transport gas from Canada and domestic sources to the New England Market, as proposed by the Iroquois Gas Transmission System and the Tennessee Gas Pipeline Company. The U.S. Department of Energy Office of Fossil Energy was a cooperating agency during statement development and adopted the statement on 9/1/1990.

  3. Scoping Study on the Safety Impact of Valve Spacing in Natural Gas Pipelines

    SciTech Connect (OSTI)

    Sulfredge, Charles David [ORNL

    2007-07-01T23:59:59.000Z

    The U.S. Department of Transportation's Pipeline and Hazardous Materials Safety Administration (PHMSA) is responsible for ensuring the safe, reliable, and environmentally sound operation of the nation's natural gas and hazardous liquid pipelines. Regulations adopted by PHMSA for gas pipelines are provided in 49 CFR 192, and spacing requirements for valves in gas transmission pipelines are presented in 49 CFR 192.179. The present report describes the findings of a scoping study conducted by Oak Ridge National Laboratory (ORNL) to assist PHMSA in assessing the safety impact of system valve spacing. Calculations of the pressures, temperatures, and flow velocities during a set of representative pipe depressurization transients were carried out using a one-dimensional numerical model with either ideal gas or real gas properties for the fluid. With both ideal gas and real gas properties, the high-consequence area radius for any resulting fire as defined by Stevens in GRI-00/0189 was evaluated as one measure of the pipeline safety. In the real gas case, a model for convective heat transfer from the pipe wall is included to assess the potential for shut-off valve failures due to excessively low temperatures resulting from depressurization cooling of the pipe. A discussion is also provided of some additional factors by which system valve spacing could affect overall pipeline safety. The following conclusions can be drawn from this work: (1) Using an adaptation of the Stephens hazard radius criteria, valve spacing has a negligible influence on natural gas pipeline safety for the pipeline diameter, pressure range, and valve spacings considered in this study. (2) Over the first 30 s of the transient, pipeline pressure has a far greater effect on the hazard radius calculated with the Stephens criteria than any variations in the transient flow decay profile and the average discharge rate. (3) Other factors besides the Stephens criteria, such as the longer burn time for an accidental fire, greater period of danger to emergency personnel, increased unavoidable loss of gas, and possible depressurization cooling of the shut-off valves may also be important when deciding whether a change in the required valve spacing would be beneficial from a safety standpoint. (4) The average normalized discharge rate of {lambda}{sub avg} = 0.33 assumed by Stephens in developing his safety criteria is an excellent conservative value for natural gas discharge at the pressures, valve spacings, and pipe diameter used in this study. This conclusion remains valid even when real rather than ideal gas properties are considered in the analysis. (5) Significant pipe wall cooling effects (T{sub w} < -50 F or 228 K) can extend for a mile or more upstream from the rupture point within 30 s of a break. These conditions are colder than the temperature range specifications for many valve lubricants. The length of the low-temperature zone due to this cooling effect is also essentially independent of the system shut-off valve spacing or the distance between the break and a compressor station. (6) Having more redundant shut-off valves available would reduce the probability that pipe cooling effects could interfere with isolating the broken area following a pipeline rupture accident.

  4. EnergyEfficient Pipelines John Teifel, David Fang, David Biermann, Clint Kelly, and Rajit Manohar

    E-Print Network [OSTI]

    Manohar, Rajit

    Energy­Efficient Pipelines John Teifel, David Fang, David Biermann, Clint Kelly, and Rajit Manohar.S.A. Abstract We discuss the design of energy­efficient pipelines for asynchronous VLSI architectures­ rectness of the system. 1 For energy­efficient designs the number of slack­matching buffers will be less

  5. Nondestructive inspection of the condition of oil pipeline cleaning units

    SciTech Connect (OSTI)

    Berdonosov, V.A.; Boiko, D.A.; Lapshin, B.M.; Chakhlov, V.L.

    1989-02-01T23:59:59.000Z

    One of the reasons for shutdowns of main oil pipelines is stoppage of the cleaning unit in cleaning of the inner surface of paraffin deposits caused by damage to the cleaning unit. The authors propose a method of searching for and determining the condition of the cleaning unit not requiring dismantling of the pipeline according to which the initial search for the cleaning unit is done with acoustic instruments (the increased acoustic noise at the point of stoppage of its is recorded) and subsequent inspection by a radiographic method. An experimental model of an instrument was developed making it possible to determine the location of a cleaning unit in an oil pipeline in stoppage of it from the acoustic noise. The instrument consists of two blocks, the remote sensor and the indicator block, which are connected to each other with a cable up to 10 m long. The design makes it possible to place the sensor at any accessible point of a linear part of the pipeline (in a pit, on a valve, etc.) while the indicator block may remain on the surface of the ground. The results obtained make it possible to adopt the optimum solutions on elimination of their malfunctioning and to prevent emergency situations without dismantling of the pipeline. With the equipment developed it is possible to inspect oil and gas pipelines with different reasons for a reduction in their throughput.

  6. Hydrogen pipeline compressors annual progress report.

    SciTech Connect (OSTI)

    Fenske, G. R.; Erck, R. A. (Energy Systems)

    2011-07-15T23:59:59.000Z

    The objectives are: (1) develop advanced materials and coatings for hydrogen pipeline compressors; (2) achieve greater reliability, greater efficiency, and lower capital in vestment and maintenance costs in hydrogen pipeline compressors; and (3) research existing and novel hydrogen compression technologies that can improve reliability, eliminate contamination, and reduce cost. Compressors are critical components used in the production and delivery of hydrogen. Current reciprocating compressors used for pipeline delivery of hydrogen are costly, are subject to excessive wear, have poor reliability, and often require the use of lubricants that can contaminate the hydrogen (used in fuel cells). Duplicate compressors may be required to assure availability. The primary objective of this project is to identify, and develop as required, advanced materials and coatings that can achieve the friction, wear, and reliability requirements for dynamically loaded components (seal and bearings) in high-temperature, high-pressure hydrogen environments prototypical of pipeline and forecourt compressor systems. The DOE Strategic Directions for Hydrogen Delivery Workshop identified critical needs in the development of advanced hydrogen compressors - notably, the need to minimize moving parts and to address wear through new designs (centrifugal, linear, guided rotor, and electrochemical) and improved compressor materials. The DOE is supporting several compressor design studies on hydrogen pipeline compression specifically addressing oil-free designs that demonstrate compression in the 0-500 psig to 800-1200 psig range with significant improvements in efficiency, contamination, and reliability/durability. One of the designs by Mohawk Innovative Technologies Inc. (MiTi{reg_sign}) involves using oil-free foil bearings and seals in a centrifual compressor, and MiTi{reg_sign} identified the development of bearings, seals, and oil-free tribological coatings as crucial to the successful development of an advanced compressor. MiTi{reg_sign} and ANL have developed potential coatings for these rigorous applications; however, the performance of these coatings (as well as the nickel-alloy substrates) in high-temperature, high-speed hydrogen environments is unknown at this point.

  7. Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipping of GH2 Pipeline. Background: FG 64 built in 50ies, KP added in 70ies, active mining area over total length hpwgwquestissuescampbell.pdf More Documents & Publications...

  8. Engineering High Performance Service-Oriented Pipeline Applications with MeDICi

    SciTech Connect (OSTI)

    Gorton, Ian; Wynne, Adam S.; Liu, Yan

    2011-01-07T23:59:59.000Z

    The pipeline software architecture pattern is commonly used in many application domains to structure a software system. A pipeline comprises a sequence of processing steps that progressively transform data to some desired outputs. As pipeline-based systems are required to handle increasingly large volumes of data and provide high throughput services, simple scripting-based technologies that have traditionally been used for constructing pipelines do not scale. In this paper we describe the MeDICI Integration Framework (MIF), which is specifically designed for building flexible, efficient and scalable pipelines that exploit distributed services as elements of the pipeline. We explain the core runtime and development infrastructures that MIF provides, and demonstrate how MIF has been used in two complex applications to improve performance and modifiability.

  9. Seismic damage estimation for buried pipelines - challenges after three decades of progress

    SciTech Connect (OSTI)

    Pineda-porras, Omar Andrey [Los Alamos National Laboratory; Najafi, Mohammand [U. OF TEXAS

    2009-01-01T23:59:59.000Z

    This paper analyzes the evolution over the past three decades of seismic damage estimation for buried pipelines and identifies some challenges for future research studies on the subject. The first section of this paper presents a chronological description of the evolution since the mid-1970s of pipeline fragility relations - the most common tool for pipeline damage estimation - and follows with a careful analysis of the use of several ground motion parameters as pipeline damage indicators. In the second section of the paper, four gaps on the subject are identified and proposed as challenges for future research studies. The main conclusion of this work is that enhanced fragility relations must be developed for improving pipeline damage estimation, which must consider relevant parameters that could influence the seismic response of pipelines.

  10. Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs

    E-Print Network [OSTI]

    Parker, Nathan

    2004-01-01T23:59:59.000Z

    Warren R. “U.S. interstate pipelines begin 1993 on upbeat. ”66. ? True, Warren R. “Current pipeline costs. ” Oil & GasWarren R. “U.S. interstate pipelines ran more efficiently in

  11. DiscussionPaper|DiscussionPaper|DiscussionPaper|DiscussionPaper| The Cryosphere Discuss., 7, 20292060, 2013

    E-Print Network [OSTI]

    Stocker, Thomas

    Attribution 3.0 License. Solid Earth penAccess penAccess Solid Earth Discussions The Cryosphere Open of N2, O2 and CO2 mixing ratios in a 1.5 million years old ice core B. Bereiter1,2 , H. Fischer1,2 , J of the International Partnerships in Ice Core Sciences (IPICS), one target is to retrieve an ice core reaching back

  12. Hydrogen permeability and Integrity of hydrogen transfer pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    permeability and Integrity of hydrogen transfer pipelines Hydrogen permeability and Integrity of hydrogen transfer pipelines Presentation by 03-Babu for the DOE Hydrogen Pipeline...

  13. Latinas Straddling the Prison Pipeline through Gender (Non) Conformity

    E-Print Network [OSTI]

    Caraves, Jacqueline

    2014-01-01T23:59:59.000Z

    the School-to-Prison Pipeline/Building Abolition Futures.rights/school-prison-pipeline Retrieved: September 12, 2014Chicano Educational Pipeline. New York: Routledge ------(

  14. Decoupled Sampling for Graphics Pipelines

    E-Print Network [OSTI]

    Ragan-Kelley, Jonathan Millar

    We propose a generalized approach to decoupling shading from visibility sampling in graphics pipelines, which we call decoupled sampling. Decoupled sampling enables stochastic supersampling of motion and defocus blur at ...

  15. Gas Utility Pipeline Tax (Texas)

    Broader source: Energy.gov [DOE]

    All gas utilities, including any entity that owns, manages, operates, leases, or controls a pipeline for the purpose of transporting natural gas in the state for sale or compensation, as well as...

  16. Common Pipeline Carriers (North Dakota)

    Broader source: Energy.gov [DOE]

    Any entity that owns, operates, or manages a pipeline for the purpose of transporting crude petroleum, gas, coal, or carbon dioxide within or through the state of North Dakota, or is engaged in the...

  17. Interstate Natural Gas Pipelines (Iowa)

    Broader source: Energy.gov [DOE]

    This statute confers upon the Iowa Utilities Board the authority to act as an agent of the federal government in determining pipeline company compliance with federal standards within the boundaries...

  18. Gas Pipelines, County Roads (Indiana)

    Broader source: Energy.gov [DOE]

    A contract with any Board of County Commissioners is required prior to the construction of a pipeline, conduit, or private drain across or along any county highway. The contract will include terms...

  19. Pipelines programming paradigms: Prefab plumbing

    SciTech Connect (OSTI)

    Boeheim, C.

    1991-08-01T23:59:59.000Z

    Mastery of CMS Pipelines is a process of learning increasingly sophisticated tools and techniques that can be applied to your problem. This paper presents a compilation of techniques that can be used as a reference for solving similar problems

  20. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Development &

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06) 2YonthlyEnergyMapExpansion

  1. Centrifuge modelling of lateral pipeline/soil interaction -- Phase 2

    SciTech Connect (OSTI)

    Paulin, M.J.; Phillips, R. [Memorial Univ. of Newfoundland, St. John`s, Newfoundland (Canada). Centre for Cold Ocean Resources Engineering; Boivin, R. [NOVA Corp., Calgary, Alberta (Canada). NOVA Gas Transmission Limited Division

    1995-12-31T23:59:59.000Z

    An ongoing research program is investigating the load transfer behavior of buried pipelines subjected to lateral soil movement in cohesive soil. Phase 1 of this study, reported to OMAE `92, demonstrated that the centrifuge technique was appropriate for this application in determining the interaction conditions for the lateral loading of pipelines. Limited control of the shear strength masked geometric effects (trench width and burial depth) on the interaction factors and desiccation affected the interpretation of some of the interaction factors. The Phase 2 study investigated the geometric effects of pipeline soil cover, ditch width and also displacement rate. The study included a ``modelling of models`` test to verify the reliability of the centrifuge modelling technique. This paper addresses two issues: (1) The Phase 1 soil strength profiles and interaction factors were reanalyzed based on an improved understanding of the soil conditions at the time of testing; (2) A selection of the Phase 2 results are presented for a 0.95m diameter pipeline subjected to lateral soil movement. The program results are discussed and compared with current pipeline/soil interaction analysis methods.

  2. Planning of Pipeline Oil Transportation with Interface Restrictions is a Difficult Problem

    E-Print Network [OSTI]

    Endler, Markus

    Planning of Pipeline Oil Transportation with Interface Restrictions is a Difficult Problem Ruy Luiz/03 December, 2003 Abstract: An important constrain when developing a schedule for the operation of an oil pipeline is the interface between adjacent products. Due to the resulting quality loss, some products

  3. Measuring biomolecules: an image processing and length estimation pipeline using atomic

    E-Print Network [OSTI]

    Mohri, Mehryar

    Measuring biomolecules: an image processing and length estimation pipeline using atomic force, these snapshots would give direct, specific observation of the cell's regulation behavior. Taking a snapshot estimation pipeline using AFM that can achieve these measurement tolerances. In particular, we developed

  4. Pipeline capacity trading could be more efficient if{hor_ellipsis}

    SciTech Connect (OSTI)

    Roth, R.

    1995-12-31T23:59:59.000Z

    This paper discusses the efficiency of pipeline capacity trading. The characteristics of efficient markets, southwest U.S. capacity market, and a solution to excess capacity burden are discussed. It is concluded that capacity trading could be more efficient if the following were to occur: parity of capacity sales was achieved; timely reporting of EBBs of price, volume, and path was mandatory; rate caps on released capacity were removed; and market based rates are established for pipelines.

  5. REMOTE DETECTION OF INTERNAL PIPELINE CORROSION USING FLUIDIZED SENSORS

    SciTech Connect (OSTI)

    Narasi Sridhar; Garth Tormoen; Ashok Sabata

    2005-10-31T23:59:59.000Z

    Pipelines present a unique challenge to monitoring because of the great geographical distances they cover, their burial depth, their age, and the need to keep the product flowing without much interruption. Most other engineering structures that require monitoring do not pose such combined challenges. In this regard, a pipeline system can be considered analogous to the blood vessels in the human body. The human body has an extensive ''pipeline'' through which blood and other fluids are transported. The brain can generally sense damage to the system at any location and alert the body to provide temporary repair, unless the damage is severe. This is accomplished through a vast network of fixed and floating sensors combined with a vast and extremely complex communication/decision making system. The project described in this report mimics the distributed sensor system of our body, albeit in a much more rudimentary fashion. Internal corrosion is an important factor in pipeline integrity management. At present, the methods to assess internal corrosion in pipelines all have certain limitations. In-line inspection tools are costly and cannot be used in all pipelines. Because there is a significant time interval between inspections, any impact due to upsets in pipeline operations can be missed. Internal Corrosion Direct Assessment (ICDA) is a procedure that can be used to identify locations of possible internal corrosion. However, the uncertainties in the procedure require excavation and location of damage using more detailed inspection tools. Non-intrusive monitoring techniques can be used to monitor internal corrosion, but these tools also require pipeline excavation and are limited in the spatial extent of corrosion they can examine. Therefore, a floating sensor system that can deposit at locations of water accumulation and communicate the corrosion information to an external location is needed. To accomplish this, the project is divided into four main tasks related to wireless data transmission, corrosion sensor development, sensor system motion and delivery, and consideration of other pipeline operations issues. In the first year of the program, focus was on sensor development and wireless data transmission. The second year of the program, which was discontinued due to funding shortfall, would have focused on further wireless transmission development, packaging of sensor on wireless, and other operational issues. Because, the second year funding has been discontinued, recommendations are made for future studies.

  6. Network Connectivity and Price Convergency: Gas Pipeline Deregulation

    E-Print Network [OSTI]

    De Vany, Arthur; Walls, W. David

    1993-01-01T23:59:59.000Z

    Convergence: Gas Pipeline Deregulation Arthur De Vany W.Price Convergence: Gas Pipeline Deregulation Arthur De Vany

  7. Method and system for pipeline communication

    SciTech Connect (OSTI)

    Richardson; John G. (Idaho Falls, ID)

    2008-01-29T23:59:59.000Z

    A pipeline communication system and method includes a pipeline having a surface extending along at least a portion of the length of the pipeline. A conductive bus is formed to and extends along a portion of the surface of the pipeline. The conductive bus includes a first conductive trace and a second conductive trace with the first and second conductive traces being adapted to conformally couple with a pipeline at the surface extending along at least a portion of the length of the pipeline. A transmitter for sending information along the conductive bus on the pipeline is coupled thereto and a receiver for receiving the information from the conductive bus on the pipeline is also couple to the conductive bus.

  8. Computer Science and Information Technology Student Pipeline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Student Pipeline Program Description Los Alamos National Laboratory's High Performance Computing and Information Technology Divisions recruit and hire promising...

  9. NAZ EDUCATION PIPELINE the-naz.org

    E-Print Network [OSTI]

    Amin, S. Massoud

    NAZ EDUCATION PIPELINE the-naz.org 1200 W. Broadway #250 | Minneapolis, MN 55411 | Family Academy is a foundational component of the NAZ "cradle to career" pipeline. NAZ families can enroll in the Family Academy college ready. Families and children move through a "cradle to career" pipeline that provides

  10. Modeling and Validation of Pipeline Specifications

    E-Print Network [OSTI]

    Mishra, Prabhat

    -on-Chip design process. Many existing approaches employ a bottom-up approach to pipeline validation, where description language (ADL) constructs, and thus allows a powerful top-down approach to pipeline validationModeling and Validation of Pipeline Specifications PRABHAT MISHRA and NIKIL DUTT University

  11. Design Optimization of Innovative High-Level Waste Pipeline Unplugging Technologies - 13341

    SciTech Connect (OSTI)

    Pribanic, T.; Awwad, A.; Varona, J.; McDaniel, D.; Gokaltun, S.; Crespo, J. [Applied Research Center, Florida International University, 10555 West Flagler Street, Suite 2100, Miami. FL 33174 (United States)] [Applied Research Center, Florida International University, 10555 West Flagler Street, Suite 2100, Miami. FL 33174 (United States)

    2013-07-01T23:59:59.000Z

    Florida International University (FIU) is currently working on the development and optimization of two innovative pipeline unplugging methods: the asynchronous pulsing system (APS) and the peristaltic crawler system (PCS). Experiments were conducted on the APS to determine how air in the pipeline influences the system's performance as well as determine the effectiveness of air mitigation techniques in a pipeline. The results obtained during the experimental phase of the project, including data from pipeline pressure pulse tests along with air bubble compression tests are presented. Single-cycle pulse amplification caused by a fast-acting cylinder piston pump in 21.8, 30.5, and 43.6 m pipelines were evaluated. Experiments were conducted on fully flooded pipelines as well as pipelines that contained various amounts of air to evaluate the system's performance when air is present in the pipeline. Also presented are details of the improvements implemented to the third generation crawler system (PCS). The improvements include the redesign of the rims of the unit to accommodate a camera system that provides visual feedback of the conditions inside the pipeline. Visual feedback allows the crawler to be used as a pipeline unplugging and inspection tool. Tests conducted previously demonstrated a significant reduction of the crawler speed with increasing length of tether. Current improvements include the positioning of a pneumatic valve manifold system that is located in close proximity to the crawler, rendering tether length independent of crawler speed. Additional improvements to increase the crawler's speed were also investigated and presented. Descriptions of the test beds, which were designed to emulate possible scenarios present on the Department of Energy (DOE) pipelines, are presented. Finally, conclusions and recommendations for the systems are provided. (authors)

  12. U. S. gas pipelines move to comply with Order 636

    SciTech Connect (OSTI)

    Not Available

    1992-06-15T23:59:59.000Z

    This paper reports that more US interstate gas pipelines have unveiled plans to comply with the Federal Energy Regulatory Commission's Order 636 megarestructuring rule. In the latest developments: Texas Eastern Transmission Corp. (Tetco) filed the first Order 636 compliance proposal with FERC outlining new transportation rates, operational issues, and services the company plans to offer. Tenneco Gas will eliminate a layer of managers and split marketing and transportation functions into four divisions to deal with Order 646. ANR Pipeline Co. made organizational changes expected to help it participate faster and more effectively under Order 636. The company in mid-May made gas sales a stand alone activity, reorganized system sales by region, and consolidated transportation and storage functions. FERC's long awaited megarestructuring rule, issued early in April, aims to assure the open access, interstate pipelines provide equal services for all gas supplies. Companies are to submit transition plans to FERC by Nov. 2.

  13. Data Reduction Pipeline for the MMT and Magellan Infrared Spectrograph

    E-Print Network [OSTI]

    Chilingarian, Igor; Moran, Sean; Brown, Warren; McLeod, Brian; Fabricant, Daniel

    2015-01-01T23:59:59.000Z

    We describe the new spectroscopic data reduction pipeline for the multi-object MMT/Magellan Infrared Spectrograph. The pipeline is implemented in idl as a stand-alone package and is publicly available in both stable and development versions. We describe novel algorithms for sky subtraction and correction for telluric absorption. We demonstrate that our sky subtraction technique reaches the Poisson limit set by the photon statistics. Our telluric correction uses a hybrid approach by first computing a correction function from an observed stellar spectrum, and then differentially correcting it using a grid of atmosphere transmission models for the target airmass value. The pipeline provides a sufficient level of performance for real time reduction and thus enables data quality control during observations. We reduce an example dataset to demonstrate the high data reduction quality.

  14. Soft-Decision-Driven Channel Estimation for Pipelined Turbo Receivers

    E-Print Network [OSTI]

    Yoon, Daejung

    2011-01-01T23:59:59.000Z

    We consider channel estimation specific to turbo equalization for multiple-input multiple-output (MIMO) wireless communication. We develop a soft-decision-driven sequential algorithm geared to the pipelined turbo equalizer architecture operating on orthogonal frequency division multiplexing (OFDM) symbols. One interesting feature of the pipelined turbo equalizer is that multiple soft-decisions become available at various processing stages. A tricky issue is that these multiple decisions from different pipeline stages have varying levels of reliability. This paper establishes an effective strategy for the channel estimator to track the target channel, while dealing with observation sets with different qualities. The resulting algorithm is basically a linear sequential estimation algorithm and, as such, is Kalman-based in nature. The main difference here, however, is that the proposed algorithm employs puncturing on observation samples to effectively deal with the inherent correlation among the multiple demappe...

  15. REALTIME MONITORING OF PIPELINES FOR THIRD-PARTY CONTACT

    SciTech Connect (OSTI)

    Gary L. Burkhardt

    2005-12-31T23:59:59.000Z

    Third-party contact with pipelines (typically caused by contact with a digging or drilling device) can result in mechanical damage to the pipe, in addition to coating damage that can initiate corrosion. Because this type of damage often goes unreported and can lead to eventual catastrophic failure of the pipe, a reliable, cost-effective method is needed for monitoring the pipeline and reporting third-party contact events. The impressed alternating cycle current (IACC) pipeline monitoring method developed by Southwest Research Institute (SwRI) consists of impressing electrical signals on the pipe by generating a time-varying voltage between the pipe and the soil. The signal voltage between the pipe and ground is monitored continuously at receiving stations located some distance away. Third-party contact to the pipe that breaks through the coating (thus resulting in a signal path to ground) changes the signal received at the receiving stations. The IACC method was shown to be a viable method that can be used to continuously monitor pipelines for third-party contact. Electrical connections to the pipeline can be made through existing cathodic protection (CP) test points without the need to dig up the pipe. The instrumentation is relatively simple, consisting of (1) a transmitting station with a frequency-stable oscillator and amplifier and (2) a receiving station with a filter, lock-in amplifier, frequency-stable oscillator, and remote reporting device (e.g. cell phone system). Maximum distances between the transmitting and receiving stations are approximately 1.61 km (1 mile), although the length of pipeline monitored can be twice this using a single transmitter and one receiver on each side (since the signal travels in both directions). Certain conditions such as poor pipeline coatings or strong induced 60-Hz signals on the pipeline can degrade IACC performance, so localized testing should be performed to determine the suitability for an IACC installation at a given location. The method can be used with pipelines having active CP systems in place without causing interference with operation of the CP system. The most appropriate use of IACC is monitoring of localized high-consequence areas where there is a significant risk of third-party contact (e.g. construction activity). The method also lends itself to temporary, low-cost installation where there is a short-term need for monitoring.

  16. Northampton planners `thrilled' with affordable housing in pipeline

    E-Print Network [OSTI]

    Mountziaris, T. J.

    Northampton planners `thrilled' with affordable housing in pipeline By CHAD CAIN Daily Hampshire and two other significant developments under construction for senior citizens and veterans elsewhere's senior land use planner, said both panels offered small design tweaks but lauded the project overall

  17. Faraday Discuss., 1998, 109, 493516 General Discussion

    E-Print Network [OSTI]

    Kaiser, Ralf I.

    the extra- terrestrial origin of PAHs in the Martian meteorite ALH84001 has been extensively discussed against terrestrial contami- nation and how is this result connected to the origin of the PAHs? 1 J. L responded: Recent measurement of water-soluble amino acids by Bada et al.1 in ALH84001 demonstrated

  18. Chris Jesshope! 2. Pipelined and

    E-Print Network [OSTI]

    Jesshope, Chris

    to sequential tasks: Op: A ; B ; C ; D A B C D Pipelined concurrency requires sequences of operations. Given Opi, 0in, we execute sub-tasks concurrently as follows: Opi: Ai+3||Bi+2||Ci+1||Di Ai+3 Bi+2 Ci+1 Di

  19. Pipeline bottoming cycle study. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-06-01T23:59:59.000Z

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle working fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.

  20. Good News for MOS, MXU & Co. - The New Spectroscopic Pipeline for the FORSes

    E-Print Network [OSTI]

    S. Moehler

    2007-04-17T23:59:59.000Z

    Since October 1, 2006, spectroscopic data from the two FORS instruments have been reduced with a new pipeline, which is based on a bottom-up calibration approach. I give a short description of the pipeline and discuss first experiences with automatic data reduction using this software, which has significantly increased the percentage of processed data for both instruments. I will also describe possible new options for Quality Control.

  1. A preliminary investigation of the effects of environmentally assisted cracking on natural gas transmission pipelines 

    E-Print Network [OSTI]

    Curbo, Jason Wayne

    2005-08-29T23:59:59.000Z

    Concepts for the development of a model to predict natural gas transmission pipeline lifetime in a corrosive environment are constructed. Primarily, the effects of environmentally assisted cracking (EAC) are explored. Tensile test specimens from a...

  2. Capsule injection system for a hydraulic capsule pipelining system

    DOE Patents [OSTI]

    Liu, Henry (Columbia, MO)

    1982-01-01T23:59:59.000Z

    An injection system for injecting capsules into a hydraulic capsule pipelining system, the pipelining system comprising a pipeline adapted for flow of a carrier liquid therethrough, and capsules adapted to be transported through the pipeline by the carrier liquid flowing through the pipeline. The injection system comprises a reservoir of carrier liquid, the pipeline extending within the reservoir and extending downstream out of the reservoir, and a magazine in the reservoir for holding capsules in a series, one above another, for injection into the pipeline in the reservoir. The magazine has a lower end in communication with the pipeline in the reservoir for delivery of capsules from the magazine into the pipeline.

  3. Questions and Issues on Hydrogen Pipeline Transmission of Hydrogen

    E-Print Network [OSTI]

    Questions and Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Transmission of Hydrogen --- 3 Copyright: #12;Pipeline Transmission of Hydrogen --- 4 Copyright: 3. Special

  4. INTERNAL REPAIR OF PIPELINES REVIEW & EVALUATION OF INTERNAL PIPELINE REPAIR TRIALS REPORT

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-09-01T23:59:59.000Z

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is generally ineffective at restoring the pressure containing capabilities of pipelines. Failure pressure for pipe repaired with carbon fiber-reinforced composite liner was greater than that of the un-repaired pipe section with damage, indicating that this type of liner is effective at restoring the pressure containing capability of pipe. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the next phase of this project.

  5. Virginia Natural Gas's Hampton Roads Pipeline Crossing

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers Virginia Natural Gas's (VNG's) pipeline project at Hampton Roads Crossing (HRX).

  6. Natural Gas Transmission Pipeline Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

  7. Acoustic system for communication in pipelines

    SciTech Connect (OSTI)

    Martin, II, Louis Peter (San Ramon, CA); Cooper, John F. (Oakland, CA)

    2008-09-09T23:59:59.000Z

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  8. Hazardous Liquid Pipelines and Storage Facilities (Iowa)

    Broader source: Energy.gov [DOE]

    This statute regulates the permitting, construction, monitoring, and operation of pipelines transporting hazardous liquids, including petroleum products and coal slurries. The definition used in...

  9. Illinois Gas Pipeline Safety Act (Illinois)

    Broader source: Energy.gov [DOE]

    Standards established under this Act may apply to the design, installation, inspection, testing, construction, extension, operation, replacement, and maintenance of pipeline facilities. Whenever...

  10. Pipelines and Underground Gas Storage (Iowa)

    Broader source: Energy.gov [DOE]

    These rules apply to intrastate transport of natural gas and other substances via pipeline, as well as underground gas storage facilities. The construction and operation of such infrastructure...

  11. Petroleum Pipeline Eminent Domain Permit Procedures (Georgia)

    Broader source: Energy.gov [DOE]

    The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection...

  12. A feminist perspective on the school-to-labor pipeline

    E-Print Network [OSTI]

    Hextrum, Kirsten

    2014-01-01T23:59:59.000Z

    on the School-to-Labor Pipeline Collins, P. (1986) Learningon the School-to-Labor Pipeline Leonardo, Z. (2010).on the School-to-Labor Pipeline Kirsten Hextrum 1 University

  13. Structural Genomics of Minimal Organisms: Pipeline and Results

    E-Print Network [OSTI]

    Kim, Sung-Hou

    2008-01-01T23:59:59.000Z

    of Minimal Organisms: Pipeline and Results Sung-Hou Kim*,~500 genes, respectively). Pipeline: To achieve our mission,determination. Over all pipeline schemes for the single-path

  14. Trenches Under The Pipeline: The Educational Trajectories of Chicano Male Continuation High School Students

    E-Print Network [OSTI]

    Malagon, Maria

    2010-01-01T23:59:59.000Z

    Trenches Under The Pipeline: The Educational Trajectories ofnavigate the educational pipeline, continuation high school

  15. EIA - Natural Gas Pipeline Network - Pipeline Capacity and Utilization

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization & Capacity About

  16. The Automatic Real-Time GRB Pipeline of the 2-m Liverpool Telescope

    E-Print Network [OSTI]

    C. Guidorzi; A. Monfardini; A. Gomboc; C. J. Mottram; C. G. Mundell; I. A. Steele; D. Carter; M. F. Bode; R. J. Smith; S. N. Fraser; M. J. Burgdorf; A. M. Newsam

    2005-11-01T23:59:59.000Z

    The 2-m Liverpool Telescope (LT), owned by Liverpool John Moores University, is located in La Palma (Canary Islands) and operates in fully robotic mode. In 2005, the LT began conducting an automatic GRB follow-up program. On receiving an automatic GRB alert from a Gamma-Ray Observatory (Swift, INTEGRAL, HETE-II, IPN) the LT initiates a special override mode that conducts follow-up observations within 2-3 min of the GRB onset. This follow-up procedure begins with an initial sequence of short (10-s) exposures acquired through an r' band filter. These images are reduced, analyzed and interpreted automatically using pipeline software developed by our team called "LT-TRAP" (Liverpool Telescope Transient Rapid Analysis Pipeline); the automatic detection and successful identification of an unknown and potentially fading optical transient triggers a subsequent multi-color imaging sequence. In the case of a candidate brighter than r'=15, either a polarimetric (from 2006) or a spectroscopic observation (from 2007) will be triggered on the LT. If no candidate is identified, the telescope continues to obtain z', r' and i' band imaging with increasingly longer exposure times. Here we present a detailed description of the LT-TRAP and briefly discuss the illustrative case of the afterglow of GRB 050502a, whose automatic identification by the LT just 3 min after the GRB, led to the acquisition of the first early-time (< 1 hr) multi-color light curve of a GRB afterglow.

  17. Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permeability and Integrity of Hydrogen Delivery Pipelines Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines Project Objectives: To gain basic understanding of...

  18. Report to Congress: Dedicated Ethanol Pipeline Feasability Study...

    Energy Savers [EERE]

    Report to Congress: Dedicated Ethanol Pipeline Feasability Study - Energy Independence and Security Act of 2007 Section 243 Report to Congress: Dedicated Ethanol Pipeline...

  19. argentinian pipeline enlargement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 25 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  20. acicular ferrite pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 18 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  1. automatic pipeline monitoring: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 67 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  2. alaska gas pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and ROW Lower South Carolina Electric and Gas University of South Carolina Praxair Hydrogen Pipeline Working Group 4 A moving horizon solution to the gas pipeline...

  3. alaska pipeline system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 93 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  4. automatic pipeline analysing: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 45 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  5. annotation pipelines differences: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 73 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  6. arctic gas pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and ROW Lower South Carolina Electric and Gas University of South Carolina Praxair Hydrogen Pipeline Working Group 3 A moving horizon solution to the gas pipeline...

  7. arctic gas pipelines: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and ROW Lower South Carolina Electric and Gas University of South Carolina Praxair Hydrogen Pipeline Working Group 3 A moving horizon solution to the gas pipeline...

  8. alaska highway pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 45 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  9. areas osbra pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiber-reinforced polymer pipe Project Overview: Investigate 16 Code for Hydrogen Hydrogen Pipeline Renewable Energy Websites Summary: 12;2 Code for Hydrogen Pipelines...

  10. Hydrogen Delivery Technologies and Systems- Pipeline Transmission of Hydrogen

    Broader source: Energy.gov [DOE]

    Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen. Design and operations standards and materials for hydrogen and natural gas pipelines.

  11. Evalutation of Natural Gas Pipeline Materials and Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed Gas Service Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed...

  12. Energy Department Moves Forward on Alaska Natural Gas Pipeline...

    Broader source: Energy.gov (indexed) [DOE]

    guarantee program to encourage the construction of a pipeline that will bring Alaskan natural gas to the continental United States. The pipeline will provide access to Alaska's...

  13. Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

    Office of Environmental Management (EM)

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the...

  14. Evaluation of Natural Gas Pipeline Materials for Hydrogen Science...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of Natural Gas Pipeline Materials for Hydrogen Science Evaluation of Natural Gas Pipeline Materials for Hydrogen Science Presentation by 04-Adams to DOE Hydrogen...

  15. EIA - Natural Gas Pipeline Network - Regional Overview and Links

    U.S. Energy Information Administration (EIA) Indexed Site

    Overview and Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Regional Overviews and Links to Pipeline...

  16. Harmonic distortion correction in pipelined analog to digital converters

    E-Print Network [OSTI]

    Panigada, Andrea

    2009-01-01T23:59:59.000Z

    Background Correction of Harmonic Distortion in PipelinedBackground Correction of Harmonic Distortion in PipelinedADC with 69dB SNDR Enabled by Digital Harmonic Distortion

  17. TGS pipeline primed for Argentine growth, CEO says

    SciTech Connect (OSTI)

    Share, J.

    1997-03-01T23:59:59.000Z

    Nowhere in Latin America has the privatization process been more aggressively pursued than in Argentina where President Carlos Menem has successfully turned over the bulk of state companies to the private sector. In the energy sector, that meant the divestiture in 1992 of Gas del Estado, the state-owned integrated gas transportation and distribution company. It was split in two transportation companies: Transportadora de Gas del Sur (TGS) and Transportadora de Gas del Norte (TGN), and eight distribution companies. TGS is the largest transporter of natural gas in Argentina, delivering more than 60 percent of that nation`s total gas consumption with a capacity of 1.9 Bcf/d. This is the second in a series of Pipeline and Gas Journal special reports that discuss the evolving strategies of the natural gas industry as it continues to restructure amid deregulation. The article focuses on TGS, the Argentine pipeline system in which Enron Corp. is a key participant.

  18. An experimental investigation of sediment drag forces on offshore pipelines in large scale drag tank

    E-Print Network [OSTI]

    Yin, Stanley Fuming

    1984-01-01T23:59:59.000Z

    for the degree of MASTER OF SCIENCE August 1984 Major Subject: Civil Engineering AN EXPERIMENTAL INVESTIGATION OF SEDIMENT DRAG FORCES ON OFFSHORE PIPELINES IN A LARGE SCALE DRAG TANK A Thesis by STANLEY FUMING YIN Approved as to style and content by... An ever increasing demand for petroleum products and energy has led to accelerated exploration and development of oil and gas deposits. Pipelines serve as an effective, efficient and reliable means of trans- porting the oil and gas from offshore...

  19. Addressing the workforce pipeline challenge

    SciTech Connect (OSTI)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01T23:59:59.000Z

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  20. Reducing Power Dissipation in Pipelined Accumulators

    E-Print Network [OSTI]

    Nannarelli, Alberto

    Reducing Power Dissipation in Pipelined Accumulators Gian Carlo Cardarilli(1), Alberto Nannarelli(2 Informatics, Technical University of Denmark, Kongens Lyngby, Denmark Abstract-- Fast accumulation is required). Accumulators nec- essary for DDFS are then deeply pipelined down to the bit-level with two main consequences

  1. Liquefaction and Pipeline Costs Bruce Kelly

    E-Print Network [OSTI]

    1 Liquefaction and Pipeline Costs Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8 are representative of hydrogen pipeline costs; 10 percent added to unit hydrogen costs as a contingency Better-9, 2007 Columbia, Maryland #12;2 Hydrogen Liquefaction Basic process Compress Cool to temperature

  2. Pipeline Safety Research, Development and Technology

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM5Parabolic TroughPhotoCell StructureUranium

  3. Clean Development Mechanism Pipeline | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformation SmyrnaNewClay Electric Cooperative,North

  4. PGPG: An Automatic Generator of Pipeline Design for Programmable GRAPE Systems

    E-Print Network [OSTI]

    Tsuyoshi Hamada; Toshiyuki Fukushige; Junichiro Makino

    2007-03-08T23:59:59.000Z

    We have developed PGPG (Pipeline Generator for Programmable GRAPE), a software which generates the low-level design of the pipeline processor and communication software for FPGA-based computing engines (FBCEs). An FBCE typically consists of one or multiple FPGA (Field-Programmable Gate Array) chips and local memory. Here, the term "Field-Programmable" means that one can rewrite the logic implemented to the chip after the hardware is completed, and therefore a single FBCE can be used for calculation of various functions, for example pipeline processors for gravity, SPH interaction, or image processing. The main problem with FBCEs is that the user need to develop the detailed hardware design for the processor to be implemented to FPGA chips. In addition, she or he has to write the control logic for the processor, communication and data conversion library on the host processor, and application program which uses the developed processor. These require detailed knowledge of hardware design, a hardware description language such as VHDL, the operating system and the application, and amount of human work is huge. A relatively simple design would require 1 person-year or more. The PGPG software generates all necessary design descriptions, except for the application software itself, from a high-level design description of the pipeline processor in the PGPG language. The PGPG language is a simple language, specialized to the description of pipeline processors. Thus, the design of pipeline processor in PGPG language is much easier than the traditional design. For real applications such as the pipeline for gravitational interaction, the pipeline processor generated by PGPG achieved the performance similar to that of hand-written code. In this paper we present a detailed description of PGPG version 1.0.

  5. Carbon Additionality: Discussion Paper

    E-Print Network [OSTI]

    Carbon Additionality: A review Discussion Paper Gregory Valatin November 2009 Forest Research. Voluntary Carbon Standards American Carbon Registry Forest Carbon Project Standard (ACRFCPS) 27 CarbonFix Standard (CFS) 28 Climate, Community and Biodiversity Standard (CCBS) 28 Forest Carbon Standard (FCS) 28

  6. Detection of Unauthorized Construction Equipment in Pipeline Right-of-Ways

    SciTech Connect (OSTI)

    Maurice Givens; James E. Huebler

    2004-09-30T23:59:59.000Z

    The leading cause of incidents on transmission pipelines is damage by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline is hit. Currently there is no method for continuously monitoring a pipeline right-of-way. Instead, companies periodically walk or fly over the pipeline to find unauthorized construction activities. Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber buried above the pipeline as a distributed sensor. A custom optical time domain reflectometer (OTDR) is used to interrogate the fiber. Key issues in the development of this technology are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. Advantages of the reflectometry technique are the ability to accurately pinpoint the location of the construction activity and the ability to separately monitor simultaneously occurring events. The basic concept of using OTDR with an optical fiber buried above the pipeline to detect encroachment of construction equipment into the right of way works. Sufficiently rapid time response is possible; permitting discrimination between encroachment types. Additional work is required to improve the system into a practical device.

  7. Management's Discussion & Analysis Profile

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to deliver on its mission. BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River...

  8. Management's Discussion & Analysis Profile

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy and new technologies. The agency funds regional efforts to protect and enhance fish & wildlife populations affected by federal hydropower development and operations in the...

  9. Pipe line activity expected to maintain current levels throughout 1990s. [Global construction trends in natural gas and oil pipelines

    SciTech Connect (OSTI)

    Ives, G. Jr.

    1993-11-01T23:59:59.000Z

    This article consists of several smaller papers which discuss the construction projections for new oil and gas pipelines on a global basis, excluding the US and Canada. The paper provides numerous tables showing the projected types and mileages for proposed pipelines and the types of products to be shipped in each pipeline. The article features activities of individual countries and regions which have any significant oil or gas production. The individual papers are broken into continental regions including Europe, the North Sea, Africa, the Middle East, Indonesia, the Far East, Australia, Central America, and South America.

  10. Rotary Pipeline Processors Simon Moore, Peter Robinson, Steve Wilcox

    E-Print Network [OSTI]

    Robinson, Peter

    to the current range of superscalar designs using multiple instruction issue into parallel pipelines to increase] is designed around a bi-directional pipeline carry- ing instructions and arguments in one direction it will start to execute as soon as the data arrives. 2.2 Basic Pipeline Construction A rotary pipeline

  11. An approach for simulation of paraffin deposition in pipelines as a function of flow characteristics with a reference to Teesside oil pipeline

    SciTech Connect (OSTI)

    Hamouda, A.A.; Davidsen, S.

    1995-11-01T23:59:59.000Z

    Paraffin deposition is experienced in pipelines during transportation of oil when the oil temperature is cooled below its paraffin deposition temperature. The formed paraffin crystals in the bulk flow are believed to be transported by molecular, brownian diffusion and shear dispersion. Gravity settling mechanism in previous work in the authors` laboratory has been shown to contribute to the total paraffin deposition, however, to a lesser extent than the above mentioned mechanisms. The work done here demonstrates that the paraffin deposition by molecular diffusion mechanism is a dominant one. This is in agreement with other previous studies done on the paraffin deposition. In this study, however, experimental design was made to quantify this statement. The paraffin concentration gradient (dc/dr) is the driving force of the molecular diffusion mechanism (where r is the pipeline radius). In pipelines the cooling rate is one of many factors that affect the paraffin deposition profile. Equipment was designed to simulate the flow characteristics at pipeline pressure. A three dimensional model was developed for paraffin deposition rates at various flow regimes. The developed experimental approach and the designed equipment for simulating the pipeline conditions are presented in this paper.

  12. DISCUSSION PAPER - Optimization Online

    E-Print Network [OSTI]

    2012-01-13T23:59:59.000Z

    Jan 13, 2012 ... In this paper, we are interested in the development of efficient first-order methods ... Belgian State, Prime Minister's Office, Science Policy Programming. ...... about global economic recovery on energy transition and CO2 price.

  13. The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline

    E-Print Network [OSTI]

    Bruneau, Steve

    ;Pipeline Repair Protocol 1 Leak detection and compressor shut down 2 Damage location 3 Excavate pipe 4 Murdoch Gorm Dunkirk Existing Gas Pipeline Proposed Gas Pipeline Existing Oil Pipeline 20" 30" 36" (2) 40 Gas Pipeline Proposed Gas Pipeline Existing Oil Pipeline 20" 30" 36" (2) 40" 40" 28" 42" 36" 40" 30

  14. EIS-0433: Keystone XL Pipeline

    Broader source: Energy.gov [DOE]

    The proposed Keystone XL project consists of a 1,700-mile crude oil pipeline and related facilities that would primarily be used to transport Western Canadian Sedimentary Basin crude oil from an oil supply hub in Alberta, Canada to delivery points in Oklahoma and Texas. This EIS, prepared by the Department of State, evaluates the environmental impacts of the proposed Keystone XL project. DOE’s Western Area Power Administration, a cooperating agency, has jurisdiction over certain proposed transmission facilities (construction and operation of a short 230-kv transmission line and construction of a new substation). The State Department published a notice in the Federal Register on February 3, 2012, regarding the denial of the Keystone XL presidential permit (77 FR 5614).

  15. Pipeline Access and Market Integration in the Natural Gas Industry: Evidence from Cointegration Tests

    E-Print Network [OSTI]

    De Vany, Arthur; Walls, W. David

    1993-01-01T23:59:59.000Z

    System for Natural Gas Pipelines." Study prepared underin the Natural Gas Pipeline Industry. Ph.D. dissertation,the remaining barfers to pipeline integration. REFERENCES

  16. Stuck in the Pipeline: A Critical Review of STEM Workforce Literature

    E-Print Network [OSTI]

    Metcalf, Heather

    2010-01-01T23:59:59.000Z

    and science careers: Leaky pipeline or gender filter? GenderL. (2006). Expanding the pipeline: Transforming the cultureThe incredible shrinking pipeline. Inroads: SIGCE Bulletin,

  17. Applications of the pipeline environment for visual informatics and genomics computations

    E-Print Network [OSTI]

    2011-01-01T23:59:59.000Z

    et al. : Applications of the pipeline environment for visualusing the LONI pipeline. Frontiers in Neuroinformatics 2010,Access Applications of the pipeline environment for visual

  18. BS-Seeker2: a versatile aligning pipeline for bisulfite sequencing data

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    RL: MethylCoder: software pipeline for bisulfite-treateda versatile aligning pipeline for bisulfite sequencing dataof BS Seeker, as a full pipeline for mapping bisulfite

  19. A Crack in the Pipeline: Why Female Underrepresented Racial Minority Students Leave Engineering

    E-Print Network [OSTI]

    Vazquez-Akim, Jenn

    2014-01-01T23:59:59.000Z

    Espinosa, Lorelle L. (2011). Pipelines and pathways: womenAngeles A Crack in the Pipeline: Why Female UnderrepresentedA Crack in the Pipeline: Why Female Underrepresented Racial

  20. GenePRIMP: A GENE PRediction IMprovement Pipeline for Prokaryotic genomes

    E-Print Network [OSTI]

    Pati, Amrita

    2012-01-01T23:59:59.000Z

    PRediction IMprovement Pipeline for Amrita Pati 1 , NataliaGene Prediction IMprovement Pipeline, http://geneprimp.jgi-based post-processing pipeline that identifies erroneously

  1. Rnnotator: an automated de novo transcriptome assembly pipeline from stranded RNA-Seq reads

    E-Print Network [OSTI]

    Martin, Jeffrey

    2011-01-01T23:59:59.000Z

    transcriptome assembly pipeline from stranded RNA-Seq readsRnnotator assembly pipeline. Figure 2. Read dereplicationan automated software pipeline that generates transcript

  2. Applications of the Pipeline Environment for Visual Informatics and Genomics Computations

    E-Print Network [OSTI]

    2011-01-01T23:59:59.000Z

    et al. : Applications of the pipeline environment for visualusing the LONI pipeline. Frontiers in Neuroinformatics 2010,Access Applications of the pipeline environment for visual

  3. Pipelines, Pathways, and Payoffs: Economic Challenges and Returns to Changing Demographics in California

    E-Print Network [OSTI]

    Stiles, Jon; Brady, Henry

    2007-01-01T23:59:59.000Z

    on Multiple Pathways Pipelines, Pathways, and Payoffs:Jon Stiles & Henry Brady Pipelines, Pathways, and Payoffs:of the educational pipeline to describe how students

  4. Efficient, distributed and interactive neuroimaging data analysis using the LONI Pipeline

    E-Print Network [OSTI]

    2009-01-01T23:59:59.000Z

    A. W. (2003). The LONI pipeline process- ing environment.in Neuroinformatics LONI Pipeline Thompson, P. M. (2006).provenance using the LONI pipeline workfl ow environment.

  5. Experience with pipelined multiple instruction streams

    SciTech Connect (OSTI)

    Jordon, H.F.

    1984-01-01T23:59:59.000Z

    Pipelining has been used to implement efficient, high-speed vector computers. It is also an effective method for implementing multiprocessors. The Heterogeneous Element Processor (HEP) built by Denelcor Incorporated is the first commercially available computer system to use pipelining to implement multiple processes. This paper introduces the architecture and programming environment of the HEP and surveys a range of scientific applications programs for which parallel versions have been produced, tested, and analyzed on this computer. In all cases, the ideal of one instruction completion every pipeline step time is closely approached. Speed limitations in the parallel programs are more often a result of the extra code necessary to ensure synchronization than of actual synchronization lockout at execution time. The pipelined multiple instruction stream architecture is shown to cover a wide range of applications with good utilization of the parallel hardware.

  6. Exploiting level sensitive latches in wire pipelining 

    E-Print Network [OSTI]

    Seth, Vikram

    2005-02-17T23:59:59.000Z

    The present research presents procedures for exploitation of level sensitive latches in wire pipelining. The user gives a Steiner tree, having a signal source and set of destination or sinks, and the location in rectangular plane, capacitive load...

  7. Pipeline Politics: Natural Gas in Eurasia 

    E-Print Network [OSTI]

    Landrum, William W.; Llewellyn, Benjamin B.; Limesand, Craig M.; Miller, Dante J.; Morris, James P.; Nowell, Kathleen S.; Sherman, Charlotte L.

    2010-01-01T23:59:59.000Z

    important to US efforts to reduce its reliance on Middle Eastern energy resources. Presently, pipelines in Eurasia stretch across thousands of miles throughout unstable political regions. Disruptions in gas and oil supplies negatively affect the economies...

  8. Natural Pipeline of America Check Presentation 

    E-Print Network [OSTI]

    Unknown

    2011-08-17T23:59:59.000Z

    An archaeological investigation of approximately 1000 feet of a proposed 22,000 foot natural gas pipeline in southeastern Orange County, Texas was performed by Brazos Valley Research Associates of Bryan, Texas in August 2001. No archaeological sites...

  9. On-the-fly pipeline parallelism

    E-Print Network [OSTI]

    Lee, I-Ting Angelina

    Pipeline parallelism organizes a parallel program as a linear sequence of s stages. Each stage processes elements of a data stream, passing each processed data element to the next stage, and then taking on a new element ...

  10. A Pipeline for Computational Historical Linguistics

    E-Print Network [OSTI]

    #12;A Pipeline for Computational Historical Linguistics Lydia Steiner Bioinformatics Group of computational methods. In the biological context, computational methods play a dominating role due, Interdisciplinary Center for Bioinformatics, University of Leipzig Peter F. Stadler Bioinformatics Group

  11. The evaluation and restoration of a deteriorated buried gas pipeline

    SciTech Connect (OSTI)

    Dovico, R.; Montero, E.

    1996-12-31T23:59:59.000Z

    Historically, the Argentine gas transmission and distribution industry was owned and operated by the State. In 1992, by government decree, this entire industry was transferred to private owners and operators, and divided into two Gas Transmission Companies (TGN and TGS) and eight Gas Distribution Companies. The pipelines and related facilities had been left in an operating condition, however major capital investments were required to assure that the integrity, reliability and operability of the facilities were intact. These capital expenditures were mandatory in many areas as part of the privatization. Maintenance and rehabilitation tasks were developed for the entire transmission system, with the intent to reduce the number of unscheduled outages, optimize system maintenance costs, increase operation safety, and upgrade the pipeline to ensure compliance with the international code. Transportadora de Gas del Norte (TGN), operated by Nova Gas International of Calgary, Canada, consists of two major pipeline transmission systems. The North Line, which transports gas from Northern Argentina and Bolivia to markets south to Buenos Aires is a 24 inch, 3,000 Km system constructed in 1960. It was constructed using a field applied asphalt coating system. The Center West Line, which transports gas from central Argentina (Neuquen) to markets in the western part of the country and also the Buenos Aires area, is a 30 inch, 1,400 Km system constructed in 1981. It was constructed using a field applied polyethylene tape coating system.

  12. Urethane coatings rehabilitate large crude oil pipeline

    SciTech Connect (OSTI)

    Kresic, W. [Interprovincial Pipe Line Inc., Edmonton, Alberta (Canada)

    1995-10-01T23:59:59.000Z

    Interprovincial Pipe Line Inc. (IPL) provides a vital transportation link for moving liquid petroleum resources from oil-producing areas of western Canada to refining centers and markets in eastern canada and the midwestern US. Together with Lakehead Pipe Line Co., Inc., the pipeline system consists of about 7,600 miles of pipe. Approximately 1.6 million bpd of crude oil and liquid hydrocarbons are transported by the system. Along with high-resolution inspection data, an in-house engineering critical assessment process based on Battelle`s NG-18 surface flaw equation was developed to identify corrosion anomalies needing structural reinforcement sleeve repairs. A majority of ht non-critical anomalies remained unearthed and were exposed to possible future growth which could become critical. Several rehabilitation methods were considered including on-going sleeve repair, selective pipe replacement, and coating reconditioning. Economics and logistics of sleeving programs and selective pipe replacement were well known at IPL. However, aspects of replacing a coating system over a relatively long length of pipe were not completely known. Preliminary cost estimates favored replacement of the coating over a massive sleeving program or pipe replacement. To gain further insight, IPL began a two-year pilot program to research long length coating replacement feasibility. Two sections of Line 3 ultimately were rehabilitated in this manner. This paper reviews the project.

  13. Field evaluation of the British Gas elastic-wave vehicle for detecting stress corrosion cracking in natural gas transmission pipelines. Final report, June 1995

    SciTech Connect (OSTI)

    Culbertson, D.L.; Whitney, C.E.

    1995-07-01T23:59:59.000Z

    The objective of this project was to provide the gas pipeline industry with a more comprehensive understanding of the capabilities of the elastic-wave, in-line inspection system developed by British Gas (BG) for detecting stress corrosion cracking (SCC) in natural gas transmission pipelines.

  14. Estimating Reliability and Throughput of Source-synchronous Wave-pipelined Interconnect

    E-Print Network [OSTI]

    Lemieux, Guy

    , we develop a statistical model of dynamic timing uncertainty. We show that it is important to distinguish between static and dynamic sources of tim- ing uncertainty, because source-synchronous wave pipelin- ing is much more sensitive to the latter. We use HSPICE simulations to develop a model for a wave

  15. A 1.8V 10-bit 10MS/sec pipelined ADC 

    E-Print Network [OSTI]

    Gunay, Zeki Sezgin

    1997-01-01T23:59:59.000Z

    The objective of this thesis is to develop a pipelined analog-to-digital converter which operates under a single supply voltage of 1.8V and is capable of resolving 10 bits at a rate of IOMS/sec. Although the overall architecture of the developed...

  16. Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

    SciTech Connect (OSTI)

    Pharris, T. C.; Kolpa, R. L.

    2008-01-31T23:59:59.000Z

    The U.S. liquid petroleum pipeline industry is large, diverse, and vital to the nation's economy. Comprised of approximately 200,000 miles of pipe in all fifty states, liquid petroleum pipelines carried more than 40 million barrels per day, or 4 trillion barrel-miles, of crude oil and refined products during 2001. That represents about 17% of all freight transported in the United States, yet the cost of doing so amounted to only 2% of the nation's freight bill. Approximately 66% of domestic petroleum transport (by ton-mile) occurs by pipeline, with marine movements accounting for 28% and rail and truck transport making up the balance. In 2004, the movement of crude petroleum by domestic federally regulated pipelines amounted to 599.6 billion tonmiles, while that of petroleum products amounted to 315.9 billion ton-miles (AOPL 2006). As an illustration of the low cost of pipeline transportation, the cost to move a barrel of gasoline from Houston, Texas, to New York Harbor is only 3 cents per gallon, which is a small fraction of the cost of gasoline to consumers. Pipelines may be small or large, up to 48 inches in diameter. Nearly all of the mainline pipe is buried, but other pipeline components such as pump stations are above ground. Some lines are as short as a mile, while others may extend 1,000 miles or more. Some are very simple, connecting a single source to a single destination, while others are very complex, having many sources, destinations, and interconnections. Many pipelines cross one or more state boundaries (interstate), while some are located within a single state (intrastate), and still others operate on the Outer Continental Shelf and may or may not extend into one or more states. U.S. pipelines are located in coastal plains, deserts, Arctic tundra, mountains, and more than a mile beneath the water's surface of the Gulf of Mexico (Rabinow 2004; AOPL 2006). The network of crude oil pipelines in the United States is extensive. There are approximately 55,000 miles of crude oil trunk lines (usually 8 to 24 inches in diameter) in the United States that connect regional markets. The United States also has an estimated 30,000 to 40,000 miles of small gathering lines (usually 2 to 6 inches in diameter) located primarily in Texas, Oklahoma, Louisiana, and Wyoming, with small systems in a number of other oil producing states. These small lines gather the oil from many wells, both onshore and offshore, and connect to larger trunk lines measuring 8 to 24 inches in diameter. There are approximately 95,000 miles of refined products pipelines nationwide. Refined products pipelines are found in almost every state in the United States, with the exception of some New England states. These refined product pipelines vary in size from relatively small, 8- to 12-inch-diameter lines, to up to 42 inches in diameter. The overview of pipeline design, installation, and operation provided in the following sections is only a cursory treatment. Readers interested in more detailed discussions are invited to consult the myriad engineering publications available that provide such details. The two primary publications on which the following discussions are based are: Oil and Gas Pipeline Fundamentals (Kennedy 1993) and the Pipeline Rules of Thumb Handbook (McAllister 2002). Both are recommended references for additional reading for those requiring additional details. Websites maintained by various pipeline operators also can provide much useful information, as well as links to other sources of information. In particular, the website maintained by the U.S. Department of Energy's Energy Information Administration (EIA) (http://www.eia.doe.gov) is recommended. An excellent bibliography on pipeline standards and practices, including special considerations for pipelines in Arctic climates, has been published jointly by librarians for the Alyeska Pipeline Service Company (operators of the Trans-Alaska Pipeline System [TAPS]) and the Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001)

  17. The Sloan Digital Sky Survey Monitor Telescope Pipeline

    E-Print Network [OSTI]

    D. L. Tucker; S. Kent; M. W. Richmond; J. Annis; J. A. Smith; S. S. Allam; C. T. Rodgers; J. L. Stute; J. K. Adelman-McCarthy; J. Brinkmann; M. Doi; D. Finkbeiner; M. Fukugita; J. Goldston; B. Greenway; J. E. Gunn; J. S. Hendry; D. W. Hogg; S. -I. Ichikawa; Z. Ivezic; G. R. Knapp; H. Lampeitl; B. C. Lee; H. Lin; T. A. McKay; A. Merrelli; J. A. Munn; E. H. Neilsen, Jr.; H. J. Newberg; G. T. Richards; D. J. Schlegel; C. Stoughton; A. Uomoto; B. Yanny

    2006-08-26T23:59:59.000Z

    The photometric calibration of the Sloan Digital Sky Survey (SDSS) is a multi-step process which involves data from three different telescopes: the 1.0-m telescope at the US Naval Observatory (USNO), Flagstaff Station, Arizona (which was used to establish the SDSS standard star network); the SDSS 0.5-m Photometric Telescope (PT) at the Apache Point Observatory (APO), New Mexico (which calculates nightly extinctions and calibrates secondary patch transfer fields); and the SDSS 2.5-m telescope at APO (which obtains the imaging data for the SDSS proper). In this paper, we describe the Monitor Telescope Pipeline, MTPIPE, the software pipeline used in processing the data from the single-CCD telescopes used in the photometric calibration of the SDSS (i.e., the USNO 1.0-m and the PT). We also describe transformation equations that convert photometry on the USNO-1.0m u'g'r'i'z' system to photometry the SDSS 2.5m ugriz system and the results of various validation tests of the MTPIPE software. Further, we discuss the semi-automated PT factory, which runs MTPIPE in the day-to-day standard SDSS operations at Fermilab. Finally, we discuss the use of MTPIPE in current SDSS-related projects, including the Southern u'g'r'i'z' Standard Star project, the u'g'r'i'z' Open Star Clusters project, and the SDSS extension (SDSS-II).

  18. A Cheap Levitating Gas/Load Pipeline

    E-Print Network [OSTI]

    Alexander Bolonkin

    2008-12-02T23:59:59.000Z

    Design of new cheap aerial pipelines, a large flexible tube deployed at high altitude, for delivery of natural (fuel) gas, water and other payload over a long distance is delineated. The main component of the natural gas is methane which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg (1 pound). The lightweight film flexible pipeline can be located in air at high altitude and, as such, does not damage the environment. Using the lift force of this pipeline and wing devices payloads of oil, water, or other fluids, or even solids such as coal, cargo, passengers can be delivered cheaply at long distance. This aerial pipeline dramatically decreases the cost and the time of construction relative to conventional pipelines of steel which saves energy and greatly lowers the capital cost of construction. The article contains a computed project for delivery 24 billion cubic meters of gas and tens of million tons of oil, water or other payload per year.

  19. AIRBORNE, OPTICAL REMOTE SENSING OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    SciTech Connect (OSTI)

    Jerry Myers

    2003-05-13T23:59:59.000Z

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. This six-month technical report summarizes the progress for each of the proposed tasks, discusses project concerns, and outlines near-term goals. Ophir has completed a data survey of two major natural gas pipeline companies on the design requirements for an airborne, optical remote sensor. The results of this survey are disclosed in this report. A substantial amount of time was spent on modeling the expected optical signal at the receiver at different absorption wavelengths, and determining the impact of noise sources such as solar background, signal shot noise, and electronic noise on methane and ethane gas detection. Based upon the signal to noise modeling and industry input, Ophir finalized the design requirements for the airborne sensor, and released the critical sensor light source design requirements to qualified vendors. Responses from the vendors indicated that the light source was not commercially available, and will require a research and development effort to produce. Three vendors have responded positively with proposed design solutions. Ophir has decided to conduct short path optical laboratory experiments to verify the existence of methane and absorption at the specified wavelength, prior to proceeding with the light source selection. Techniques to eliminate common mode noise were also evaluated during the laboratory tests. Finally, Ophir has included a summary of the potential concerns for project success and has established future goals.

  20. An Initial Evaluation Of Characterization And Closure Options For Underground Pipelines Within A Hanford Site Single-Shell Tank Farm

    SciTech Connect (OSTI)

    Badden, Janet W. [Washington River Protection Solutions, LLC, Richland, WA (United States); Connelly, Michael P. [Washington River Protection Solutions, LLC, Richland, WA (United States); Seeley, Paul N. [Cenibark International, Inc., Kennewick (United States); Hendrickson, Michelle L. [Washington State Univ., Richland (United States). Dept. of Ecology

    2013-01-10T23:59:59.000Z

    The Hanford Site includes 149 single-shell tanks, organized in 12 'tank farms,' with contents managed as high-level mixed waste. The Hanford Federal Facility Agreement and Consent Order requires that one tank farm, the Waste Management Area C, be closed by June 30, 2019. A challenge to this project is the disposition and closure of Waste Management Area C underground pipelines. Waste Management Area C contains nearly seven miles of pipelines and 200 separate pipe segments. The pipelines were taken out of service decades ago and contain unknown volumes and concentrations of tank waste residuals from past operations. To understand the scope of activities that may be required for these pipelines, an evaluation was performed. The purpose of the evaluation was to identify what, if any, characterization methods and/or closure actions may be implemented at Waste Management Area C for closure of Waste Management Area C by 2019. Physical and analytical data do not exist for Waste Management Area C pipeline waste residuals. To develop estimates of residual volumes and inventories of contamination, an extensive search of available information on pipelines was conducted. The search included evaluating historical operation and occurrence records, physical attributes, schematics and drawings, and contaminant inventories associated with the process history of plutonium separations facilities and waste separations and stabilization operations. Scoping analyses of impacts to human health and the environment using three separate methodologies were then developed based on the waste residual estimates. All analyses resulted in preliminary assessments, indicating that pipeline waste residuals presented a comparably low long-term impact to groundwater with respect to soil, tank and other ancillary equipment residuals, but exceeded Washington State cleanup requirement values. In addition to performing the impact analyses, the assessment evaluated available sampling technologies and pipeline removal or treatment technologies. The evaluation accounted for the potential high worker risk, high cost, and schedule impacts associated with characterization, removal, or treatment of pipelines within Waste Management Area C for closure. This assessment was compared to the unknown, but estimated low, long-term impacts to groundwater associated with remaining waste residuals should the pipelines be left "as is" and an engineered surface barrier or landfill cap be placed. This study also recommended that no characterization or closure actions be assumed or started for the pipelines within Waste Management Area C, likewise with the premise that a surface barrier or landfill cap be placed over the pipelines.

  1. AIRBORNE, OPTICAL REMOTE SENSING OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    SciTech Connect (OSTI)

    Jerry Myers

    2003-11-12T23:59:59.000Z

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. This second six-month technical report summarizes the progress made towards defining, designing, and developing the hardware and software segments of the airborne, optical remote methane and ethane sensor. The most challenging task to date has been to identify a vendor capable of designing and developing a light source with the appropriate output wavelength and power. This report will document the work that has been done to identify design requirements, and potential vendors for the light source. Significant progress has also been made in characterizing the amount of light return available from a remote target at various distances from the light source. A great deal of time has been spent conducting laboratory and long-optical path target reflectance measurements. This is important since it helps to establish the overall optical output requirements for the sensor. It also reduces the relative uncertainty and risk associated with developing a custom light source. The data gathered from the optical path testing has been translated to the airborne transceiver design in such areas as: fiber coupling, optical detector selection, gas filters, and software analysis. Ophir will next, summarize the design progress of the transceiver hardware and software development. Finally, Ophir will discuss remaining project issues that may impact the success of the project.

  2. api pipeline conference: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of both pipelining methods. We applied our method to 1-bit and 2-bit adder Ha, Dong S. 7 Hydrogen Pipeline Material Testing We provide critical data, measurement methods and...

  3. ,"U.S. Natural Gas Pipeline Imports From Canada (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    2015 1:45:50 PM" "Back to Contents","Data 1: U.S. Natural Gas Pipeline Imports From Canada (MMcf)" "Sourcekey","N9102CN2" "Date","U.S. Natural Gas Pipeline Imports From Canada...

  4. Statistical Modeling of Corrosion Failures in Natural Gas Transmission Pipelines 

    E-Print Network [OSTI]

    Cobanoglu, Mustafa Murat

    2014-03-28T23:59:59.000Z

    Natural gas pipelines are a critical component of the U.S. energy infrastructure. The safety of these pipelines plays a key role for the gas industry. Therefore, the understanding of failure characteristics and their consequences are very important...

  5. Blending Hydrogen into Natural Gas Pipeline Networks: A Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues The United States has 11...

  6. Discussions

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluating A Potential Microhydro SiteDaytonDestilariaDirectDirect Global

  7. Altamont gas pipeline project delayed 1 year

    SciTech Connect (OSTI)

    Not Available

    1992-08-03T23:59:59.000Z

    Altamont Gas Transmission Co. will delay laying a 30 in., 620 mile pipeline to deliver Canadian gas to California until markets become more responsive. This paper reports that the decision will delay until November 1994 completion of the proposed 719 MMcfd, $612 million line. The original schedule called for construction to begin in spring 1993 with an in-service date of late 1993. Altamont pipeline is to transport gas from the US-Canadian border at Port of Wild Horse, Mont., to Opal, Wyo., where it will interconnect with the Kern River Transmission Co. pipeline to California. Altamont has obtained all regulatory approvals for its project. Altamont the project sponsors Tenneco Gas, Amoco Corp., and Entech Inc. support the decision to delay the start of construction.

  8. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Analysis Methodology and Basic Design

    SciTech Connect (OSTI)

    Vitali, Luigino [Snamprogetti-Saipem, Via Toniolo, 1, 61032 Fano, Luigino (Italy); Mattiozzi, Pierpaolo [Snamprogetti-Saipem, Via Toniolo, 1, 61032 Fano (Italy)

    2008-07-08T23:59:59.000Z

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE)--the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. This Paper describes the steps followed to formulate the concept of the special trenches and the analytical characteristics of the Model.

  9. Design of a model pipeline for testing of piezoelectric micro power generator for the Trans-Alaska Pipeline System

    E-Print Network [OSTI]

    Lah, Mike M. (Mike Myoung)

    2007-01-01T23:59:59.000Z

    In order to provide a reliable corrosion detection system for the Trans-Alaska Pipeline System (TAPS), a distributed wireless self-powered sensor array is needed to monitor the entire length of the pipeline at all times. ...

  10. Sedimentation in Coal-Water Slurry Pipelining Fabio Rosso

    E-Print Network [OSTI]

    Rosso, Fabio

    Sedimentation in Coal-Water Slurry Pipelining Fabio Rosso Dipartimento di Matematica `Ulisse Dini related to the pipelin- ing of a Coal-Water Slurry. The main aspects of the problem are both with experiments finding a remarkable agreement with the available data. 1 #12;1 Slurry handling and pipeline

  11. Evolution of Graphics Pipelines 1 Understanding the Graphics Heritage

    E-Print Network [OSTI]

    Verschelde, Jan

    Evolution of Graphics Pipelines 1 Understanding the Graphics Heritage the era of fixed-function graphics pipelines the stages to render triangles 2 Programmable Real-Time Graphics programmable vertex and fragment processors an example of a programmable pipeline unified graphics and computing processors GPU

  12. Sensor and transmitter system for communication in pipelines

    DOE Patents [OSTI]

    Cooper, John F.; Burnham, Alan K.

    2013-01-29T23:59:59.000Z

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  13. Architectural Considerations for Application-Specific Counterflow Pipelines

    E-Print Network [OSTI]

    Childers, Bruce

    a new pipeline organization called the Counterflow Pipeline (CFP). This paper evaluates CFP design to an application can be constructed automatically. Third, we present measurements that evaluate CFP design tradeArchitectural Considerations for Application-Specific Counterflow Pipelines Bruce R. Childers, Jack

  14. Method for route selection of transcontinental natural gas pipelines

    E-Print Network [OSTI]

    Kouroupetroglou, Georgios

    1 Method for route selection of transcontinental natural gas pipelines Fotios G. Thomaidis1@kepa.uoa.gr Abstract. The route of transcontinental natural gas pipelines is characterized by complexity, compared choices. Keywords: Optimum route method, natural gas, transcontinental pipelines, Caspian Region ­ E

  15. Experience with pipelined multiple instruction streams

    SciTech Connect (OSTI)

    Jordan, H.F.

    1984-01-01T23:59:59.000Z

    The authors introduces the architecture and programming environment of the heterogeneous element processor (HEP) and surveys a range of scientific applications programs for which parallel versions have been produced, tested, and analyzed on this computer. In all cases, the ideal of one instruction completion every pipeline step time is closely approached. Speed limitations in the parallel programs are more often a result of the extra code necessary to ensure synchronization than of actual synchronization lockout at execution time. The pipelined multiple instruction stream architecture is shown to cover a wide range of applications with good utilization of the parallel hardware. 35 references.

  16. Software design for panoramic astronomical pipeline processing

    E-Print Network [OSTI]

    Lior Shamir; Robert J. Nemiroff; David O. Torrey; Wellesley E. Pereira

    2005-11-23T23:59:59.000Z

    We describe the software requirement and design specifications for all-sky panoramic astronomical pipelines. The described software aims to meet the specific needs of super-wide angle optics, and includes cosmic-ray hit rejection, image compression, star recognition, sky opacity analysis, transient detection and a web server allowing access to real-time and archived data. The presented software is being regularly used for the pipeline processing of 11 all-sky cameras located in some of the world's premier observatories. We encourage all-sky camera operators to use our software and/or our hosting services and become part of the global Night Sky Live network.

  17. Self lubrication of bitumen froth in pipelines

    SciTech Connect (OSTI)

    Joseph, D.D. [Univ. of Minnesota, Minneapolis, MN (United States)

    1997-12-31T23:59:59.000Z

    In this paper I will review the main properties of water lubricated pipelines and explain some new features which have emerged from studies of self-lubrication of Syncrudes` bitumen froth. When heavy oils are lubricated with water, the water and oil are continuously injected into a pipeline and the water is stable when in a lubricating sheath around the oil core. In the case of bitumen froth obtained from the Alberta tar sands, the water is dispersed in the bitumen and it is liberated at the wall under shear; water injection is not necessary because the froth is self-lubricating.

  18. AIRBORNE, OPTICAL REMOTE SENSNG OF METHANE AND ETHANE FOR NATURAL GAS PIPELINE LEAK DETECTION

    SciTech Connect (OSTI)

    Jerry Myers

    2005-04-15T23:59:59.000Z

    Ophir Corporation was awarded a contract by the U. S. Department of Energy, National Energy Technology Laboratory under the Project Title ''Airborne, Optical Remote Sensing of Methane and Ethane for Natural Gas Pipeline Leak Detection'' on October 14, 2002. The scope of the work involved designing and developing an airborne, optical remote sensor capable of sensing methane and, if possible, ethane for the detection of natural gas pipeline leaks. Flight testing using a custom dual wavelength, high power fiber amplifier was initiated in February 2005. Ophir successfully demonstrated the airborne system, showing that it was capable of discerning small amounts of methane from a simulated pipeline leak. Leak rates as low as 150 standard cubic feet per hour (scf/h) were detected by the airborne sensor.

  19. Innovative Sensors for Pipeline Crawlers: Rotating Permanent Magnet Inspection

    SciTech Connect (OSTI)

    J. Bruce Nestleroth; Richard J. Davis; Stephanie Flamberg

    2006-09-30T23:59:59.000Z

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they may encounter. To facilitate inspection of these ''unpiggable'' pipelines, recent inspection development efforts have focused on a new generation of powered inspection platforms that are able to crawl slowly inside a pipeline and can maneuver past the physical barriers that limit internal inspection applicability, such as bore restrictions, low product flow rate, and low pressure. The first step in this research was to review existing inspection technologies for applicability and compatibility with crawler systems. Most existing inspection technologies, including magnetic flux leakage and ultrasonic methods, had significant implementation limitations including mass, physical size, inspection energy coupling requirements and technology maturity. The remote field technique was the most promising but power consumption was high and anomaly signals were low requiring sensitive detectors and electronics. After reviewing each inspection technology, it was decided to investigate the potential for a new inspection method. The new inspection method takes advantage of advances in permanent magnet strength, along with their wide availability and low cost. Called rotating permanent magnet inspection (RPMI), this patent pending technology employs pairs of permanent magnets rotating around the central axis of a cylinder to induce high current densities in the material under inspection. Anomalies and wall thickness variations are detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. This inspection method is an alternative to the common concentric coil remote field technique that induces low-frequency eddy currents in ferromagnetic pipes and tubes. Since this is a new inspection method, both theory and experiment were used to determine fundamental capabilities and limitations. Fundamental finite element modeling analysis and experimental investigations performed during this development have led to the derivation of a first order analytical equation for designing rotating magnetizers to induce current and positioning sensors to record signals from anomalies. Experimental results confirm the analytical equation and the finite element calculations provide a firm basis for the design of RPMI systems. Experimental results have shown that metal loss anomalies and wall thickness variations can be detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. The design exploits the phenomenon that circumferential currents are easily detectable at distances well away from the magnets. Current changes at anomalies were detectable with commercial low cost Hall Effect sensors. Commercial analog to digital converters can be used to measure the sensor output and data analysis can be performed in real time using PC computer systems. The technology was successfully demonstrated during two blind benchmark tests where numerous metal loss defects were detected. For this inspection technology, the detection threshold is a function of wall thickness and corrosion depth. For thinner materials, the detection threshold was experimentally shown to be comparable to magnetic flux leakage. For wall thicknesses greater than three tenths of an inch, the detection threshold increases with wall thickness. The potential for metal loss anomaly sizing was demonstrated in the second benchmarking study, again with accuracy comparable to existing magnetic flux leakage technologies. The rotating permanent magnet system has the potential for inspecting unpiggable pipelines since the magnetizer configurations can be sufficiently small with respect to the bore of the pipe to pass obstructions that limit the application of many i

  20. Leakage Risk Assessment of CO{sub 2} Transportation by Pipeline at the Illinois Basin Decatur Project, Decatur, Illinois

    SciTech Connect (OSTI)

    Mazzoldi, A.; Oldenburg, C. M.

    2013-12-17T23:59:59.000Z

    The Illinois Basin Decatur Project (IBDP) is designed to confirm the ability of the Mt. Simon Sandstone, a major regional saline-water-bearing formation in the Illinois Basin, to store 1 million tons of carbon dioxide (CO{sub 2}) injected over a period of three years. The CO{sub 2} will be provided by Archer Daniels Midland (ADM) from its Decatur, Illinois, ethanol plant. In order to transport CO{sub 2} from the capture facility to the injection well (also located within the ADM plant boundaries), a high-pressure pipeline of length 3,200 ft (975 m) has been constructed, running above the ground surface within the ADM plant footprint. We have qualitatively evaluated risks associated with possible pipeline failure scenarios that lead to discharge of CO{sub 2} within the real-world environment of the ADM plant in which there are often workers and visitors in the vicinity of the pipeline. There are several aspects of CO{sub 2} that make its transportation and potential leakage somewhat different from other substances, most notable is its non-flammability and propensity to change to solid (dry ice) upon strong decompression. In this study, we present numerical simulations using Computational Fluid Dynamics (CFD) methods of the release and dispersion of CO{sub 2} from individual hypothetical pipeline failures (i.e., leaks). Failure frequency of the various components of a pipeline transportation system over time are taken from prior work on general pipeline safety and leakage modeling and suggest a 4.65% chance of some kind of pipeline failure over the three-years of operation. Following the Precautionary Principle (see below), we accounted for full-bore leakage scenarios, where the temporal evolution of the mass release rate from the high-pressure pipeline leak locations was simulated using a state-of-the-art Pipe model which considers the thermodynamic effects of decompression in the entire pipeline. Failures have been simulated at four representative locations along the pipeline route within the ADM plant. Leakage scenarios at sites along the route of the pipeline, where plant operations (e.g., vehicular and train transportation) seem to present a higher likelihood of accidental failure, for example due to vehicles or equipment crashing into the pipeline and completely severing it, were modeled by allowing them to have a double source consistent with the pipeline releasing high-pressure CO{sub 2} from both ends of the broken pipe after a full-bore offset rupture. Simulation results show that the built environment of the plant plays a significant role in the dispersion of the gas as leaking CO{sub 2} can impinge upon buildings and other infrastructure. In all scenarios simulated, the region of very high-concentration of CO{sub 2} is limited to a small area around the pipeline failure, suggesting the likelihood of widespread harmful CO{sub 2} exposure to plant personnel from pipeline leakage is low. An additional risk is posed by the blast wave that emanates from a high-pressure pipeline when it is breached quickly. We estimate the blast wave risk as low because it occurs only for a short time in the immediate vicinity of the rupture, and requires an instantaneous large-scale rupture to occur. We recommend consideration of signage and guard rails and posts to mitigate the likelihood of vehicles crashing into the pipeline. A standardized emergency response plan applicable to capture plants within industrial sites could be developed based on the IBDP that would be useful for other capture plants. Finally, we recommend carrying out coupled wellbore-reservoir blowout scenario modeling to understand the potential for hazardous conditions arising from an unexpected blowout at the wellhead.

  1. WASTE HYDROGEN PIPELINES MONITORING IN MODERN POWER PLANT Pawel Gsior, Jerzy Kaleta

    E-Print Network [OSTI]

    Boyer, Edmond

    WASTE HYDROGEN PIPELINES MONITORING IN MODERN POWER PLANT Pawel Gsior, Jerzy Kaleta Institute hydrogen as a by-product. Part of this is reused in the other production process, however significant of the project was development of the technology for safe exploitation of by-product hydrogen in chosen chemical

  2. Energy Reduction in California Pipeline Operations

    E-Print Network [OSTI]

    technologies that can help California's industrial sectors reduce their energy consumption, their water use. In addition to significant baseline energy consumption, more energy is often required by pipelines Energy Commission Public Interest Energy Research Program Industrial/Agriculture/Water EndUse Phone

  3. For discussion only Phase Two Process

    E-Print Network [OSTI]

    Sheridan, Jennifer

    For discussion only 1 Phase Two Process 1 Revised per Advisory Committee 10/20/11Advisory Reviews Input on Select Opportunities and Charges AE to Begin Solution Development Process Organizes Work, Identifies Business Process Owners and Affected Constituent, and Refines Data Analysis #12;For discussion

  4. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet), GeothermalGridHYDROGEND D e e&FundingDiscussion Hydrogen

  5. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final 

    E-Print Network [OSTI]

    Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

    2003-01-01T23:59:59.000Z

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  6. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  7. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final

    E-Print Network [OSTI]

    Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  8. International LNG report/Developments proceed slowly in world LNG industry

    SciTech Connect (OSTI)

    Hale, D.

    1980-03-01T23:59:59.000Z

    A discussion of developments in the world LNG industry covers U.S. developments, including the Pipeline Safety Act of 1979, the National Fire Protection Association's 1979 edition of Standard 59A for the production, storage, and handling of LNG, and progress in the permitting of major LNG import projects changes in U.S. rules on LNG pricing; LNG accidents, including the grounding of the LNG carrier Vertical BarEl Paso Paul Kaise.

  9. To discuss illicit nuclear trafficking

    SciTech Connect (OSTI)

    Balatsky, Galya I [Los Alamos National Laboratory; Severe, William R [Los Alamos National Laboratory; Wallace, Richard K [Los Alamos National Laboratory

    2010-01-01T23:59:59.000Z

    The Illicit nuclear trafficking panel was conducted at the 4th Annual INMM workshop on Reducing the Risk from Radioactive and Nuclear Materials on February 2-3, 2010 in Washington DC. While the workshop occurred prior to the Nuclear Security Summit, April 12-13 2010 in Washington DC, some of the summit issues were raised during the workshop. The Communique of the Washington Nuclear Security Summit stated that 'Nuclear terrorism is one of the most challenging threats to international security, and strong nuclear security measures are the most effective means to prevent terrorists, criminals, or other unauthorized actors from acquiring nuclear materials.' The Illicit Trafficking panel is one means to strengthen nuclear security and cooperation at bilateral, regional and multilateral levels. Such a panel promotes nuclear security culture through technology development, human resources development, education and training. It is a tool which stresses the importance of international cooperation and coordination of assistance to improve efforts to prevent and respond to incidents of illicit nuclear trafficking. Illicit trafficking panel included representatives from US government, an international organization (IAEA), private industry and a non-governmental organization to discuss illicit nuclear trafficking issues. The focus of discussions was on best practices and challenges for addressing illicit nuclear trafficking. Terrorism connection. Workshop discussions pointed out the identification of terrorist connections with several trafficking incidents. Several trafficking cases involved real buyers (as opposed to undercover law enforcement agents) and there have been reports identifying individuals associated with terrorist organizations as prospective plutonium buyers. Some specific groups have been identified that consistently search for materials to buy on the black market, but no criminal groups were identified that specialize in nuclear materials or isotope smuggling. In most cases, sellers do not find legitimate buyers; however, there have been specific cases where sellers did find actual terrorist group representatives. There appears to be a connection between terrorist groups engaged in trafficking conventional arms and explosives components that are also looking for both nuclear materials and radioisotopes. Sale opportunities may create additional demand for such materials. As we can observe from Figure 1, many cases in the mid-90s involved kilogram quantities of material. There were smaller amounts of material moved in 2001, 2003 and 2006. While we have seen less trafficking cases involving PujHEU in recent years, the fact that it continues at all is troubling. The trafficking cases can be presented through their life cycle: Diversion of materials leads to Trafficker and then to Terrorist/Proliferator. Most of the information we have in trafficking cases is on the Trafficker. In 16 cases reported by the IAEA, there are 10 prosecutions of the involved trafficker. However, there are no confirmed diversions of material recorded in any of the 18 seizures. Most seizures were sting operations performed by law enforcement or security agents with no actual illicit end-user involved.

  10. Effect of the terrestrial magnetic field on direct-current measurements in underground pipelines

    SciTech Connect (OSTI)

    Dzhala, R.M.; Dikmarova, L.P.; Kornienko, V.Yu.

    1995-12-01T23:59:59.000Z

    The effect of the secondary field of an underground pipeline, magnetized by the terrestrial magnetic field, on noncontacting measurements of direct current flowing in it is discussed. The systematic errors of three known measurement methods are compared. A method based on the measurement of the difference between the field components parallel to the terrestrial field component orthogonal to the pipline is identified as the most accurate. 5 refs., 3 figs.

  11. The European Large Area ISO Survey - ISOPHOT results using the MPIA-pipeline

    E-Print Network [OSTI]

    C. Surace; P. Heraudeau; D. Lemke; S. Oliver; M. Rowan-Robinson; the ELAIS consortium

    1998-12-07T23:59:59.000Z

    The European Large Area ISO Survey (ELAIS) will provide Infrared observations of 4 regions in the sky with ISO. Around 2000 Infrared sources have been detected at 7 and 15 microns (with ISOCAM), 90 and 175 microns (with ISOPHOT)) over 13 square degrees of the sky. We present the source extraction pipeline of the 90 microns ISOPHOT observations, describe and discuss the results obtained and derive the limits of the ELAIS observational strategy.

  12. DISCUSSIONS AND CLOSURES Discussion of "1907 Static Liquefaction

    E-Print Network [OSTI]

    from the north dike failure of the Wachu sett Dam by force matching the postfailure geometry. The post-------------- DISCUSSIONS AND CLOSURES Discussion of "1907 Static Liquefaction Flow Failure of North Dike of Wachusett Dam" by Scott M. Olson, Timothy D. Stark, William H. Walton, and Gonzalo Castro

  13. Kern River natural gas pipeline commissioned

    SciTech Connect (OSTI)

    Not Available

    1992-03-16T23:59:59.000Z

    Kern River Gas Transmission Co., the biggest gas pipeline built in the U.S. in the last decade, has been commissioned. The system was dedicated Mar. 6 at a meter station in an oil field near Bakersfield, Calif. The $984 million, 904 mile pipeline is a 50-50 venture of Tenneco Inc. and Williams Cos. Planning for the project began about 7 years ago. Current operating capacity of the line is 700 MMcfd. Plans call for boosting capacity by 452 MMcfd with added compression. Most of the gas will go to thermal enhanced oil recovery projects in heavy oil fields in California. This paper reports that other customers include utilities, independent electrical power producers, and cogeneration projects.

  14. The e-MERLIN Data Reduction Pipeline

    E-Print Network [OSTI]

    Argo, Megan

    2015-01-01T23:59:59.000Z

    Written in Python and utilising ParselTongue to interface with the Astronomical Image Processing System (AIPS), the e-MERLIN data reduction pipeline is intended to automate the procedures required in processing and calibrating radio astronomy data from the e-MERLIN correlator. Driven by a plain text file of input parameters, the pipeline is modular and can be run in stages by the user, depending on requirements. The software includes options to load raw data, average in time and/or frequency, flag known sources of interference, flag more comprehensively with SERPent, carry out some or all of the calibration procedures including self-calibration), and image in either normal or wide-field mode. It also optionally produces a number of useful diagnostic plots at various stages so that the quality of the data can be assessed. The software is available for download from the e-MERLIN website or via Github.

  15. Pipeline safety joint eliminates need for divers

    SciTech Connect (OSTI)

    Not Available

    1983-04-01T23:59:59.000Z

    The Sea-Hook coupling is a diverless pressure-compensated pipeline safety joint designed to protect the pipe from damage by excessive physical loads. The coupling provides a predetermined weak point in the line that will cause a controlled separation when the line is exposed to strong wave action or dragging anchors. Moreover, it offers prepressurized remote lockout protection, metal seal integrity, no hand-up separation, enclosed bolting, optimal manual lockout, and no springs or shear rings.

  16. EIA - Natural Gas Pipeline Network - Intrastate Natural Gas Pipeline

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877 951,322Development & Expansion

  17. EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline Systems

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877 951,322Development & ExpansionInterstate

  18. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Mileage by

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877 951,322Development &Region/State Mileage

  19. Coal slurry pipeline based midwest fuel hub

    SciTech Connect (OSTI)

    Huettenhain, H. [Bechtel Technology & Consulting San Francisco, CA (United States)

    1998-12-31T23:59:59.000Z

    Low sulfur Powder River Basin (PRB) coal is a sought after fuel to comply with the year 2000 emission regulation for utility boilers. PRB coal is presently not competitive East of the Mississippi mainly because of railroad switching requirements and boiler designs not compatible with the PRB fuel characteristics. The use of the Lakes for transportation is an exception. The Lakes shipping lanes however, are only open part of the year. It is proposed to construct a coal slurry pipeline from the center of Wyoming coalfields to a hub near Detroit with access to low cost waste energy from power generation stations. The coal slurry pipeline will transport up to 25 million tons per year of fine PRB coal which has been removed from the conventionally transported coal, namely coal transported by rail. The rail delivered coal will have less dust. The system fits the DOE Vision 21 concept to mine and utilize coal in highly efficient systems and with the least environmental impact. The PRB coal is of subbituminous rank and not directly compatible with the boilers in Michigan/Indiana/Ohio area, which are designed to burn bituminous coal. Upgrading of the PRB coal using the hydrothermal slurry upgrading process can transform the PRB coal into a higher Btu content fuel by removing a large portion of the inherent moisture. Such upgraded PRB coal has proven an excellent reactive fuel when burned conventionally as PC fuel, or even when burned in slurry form as Coal Water Fuel (CWF). The cost of the process can be recovered when the process is combined with a coal slurry pipeline transport system. The result is an upgraded competitive fuel or fuels, which can be used for co-firing or re-burning applications to reduce SO{sub 2} and NOx emissions of utility boilers. The fuels can be powdered for direct fuel injection into boilers or blast furnaces as well as CWF. Depending on the stability of the upgraded PRB coal, the pipeline product could also be dewatered and prepared for export. This paper describes the concept and preliminary cost information. It also reports on reactions of the industries, which could be involved in the complex system, namely, coal mining companies, railroads, pipeline operators, fuel suppliers, and utilities.

  20. The inspection of a radiologically contaminated pipeline using a teleoperated pipe crawler

    SciTech Connect (OSTI)

    Fogle, R.F.; Kuelske, K.; Kellner, R.A.

    1995-08-01T23:59:59.000Z

    In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure of the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.

  1. Design Improvements and Analysis of Innovative High-Level Waste Pipeline Unplugging Technologies - 12171

    SciTech Connect (OSTI)

    Pribanic, Tomas; Awwad, Amer; Crespo, Jairo; McDaniel, Dwayne; Varona, Jose; Gokaltun, Seckin; Roelant, David [Florida International University, Miami, Florida (United States)

    2012-07-01T23:59:59.000Z

    Transferring high-level waste (HLW) between storage tanks or to treatment facilities is a common practice performed at the Department of Energy (DoE) sites. Changes in the chemical and/or physical properties of the HLW slurry during the transfer process may lead to the formation of blockages inside the pipelines resulting in schedule delays and increased costs. To improve DoE's capabilities in the event of a pipeline plugging incident, FIU has continued to develop two novel unplugging technologies: an asynchronous pulsing system and a peristaltic crawler. The asynchronous pulsing system uses a hydraulic pulse generator to create pressure disturbances at two opposite inlet locations of the pipeline to dislodge blockages by attacking the plug from both sides remotely. The peristaltic crawler is a pneumatic/hydraulic operated crawler that propels itself by a sequence of pressurization/depressurization of cavities (inner tubes). The crawler includes a frontal attachment that has a hydraulically powered unplugging tool. In this paper, details of the asynchronous pulsing system's ability to unplug a pipeline on a small-scale test-bed and results from the experimental testing of the second generation peristaltic crawler are provided. The paper concludes with future improvements for the third generation crawler and a recommended path forward for the asynchronous pulsing testing. (authors)

  2. api x80 pipeline: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    C Fortran API 3. c 1959 Information Processing Society of Japan 3 Kasahara, Hironori 9 Hydrogen Pipeline Material Testing We provide critical data, measurement methods and...

  3. Enter the Post-Doc: The Untapped Sourcing Pipeline

    SciTech Connect (OSTI)

    Boscow, Ryan B.

    2011-07-30T23:59:59.000Z

    This article addresses the potential formulation and utilization of an industry-based Post-Doc program in order to create workforce candidate pipelines with targeted universities.

  4. ,"International Falls, MN Natural Gas Pipeline Imports From Canada...

    U.S. Energy Information Administration (EIA) Indexed Site

    International Falls, MN Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of...

  5. ,"Highgate Springs, VT Natural Gas Pipeline Imports From Canada...

    U.S. Energy Information Administration (EIA) Indexed Site

    Highgate Springs, VT Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","L...

  6. ,"Corsby, ND Natural Gas Pipeline Imports From Canada (MMcf)...

    U.S. Energy Information Administration (EIA) Indexed Site

    Corsby, ND Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data...

  7. ,"Sault St Marie, MI Natural Gas Pipeline Exports to Canada ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Sault St Marie, MI Natural Gas Pipeline Exports to Canada (Million Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of...

  8. ,"Sweetgrass, MT Natural Gas Pipeline Imports From Canada (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Sweetgrass, MT Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest...

  9. ,"North Troy, VT Natural Gas Pipeline Imports From Canada (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Troy, VT Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data...

  10. ,"Whitlash, MT Natural Gas Pipeline Imports From Canada (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Whitlash, MT Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest...

  11. ,"Champlain, NY Natural Gas Pipeline Imports From Canada (MMcf...

    U.S. Energy Information Administration (EIA) Indexed Site

    Champlain, NY Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest...

  12. ,"Portal, ND Natural Gas Pipeline Imports From Canada (MMcf)...

    U.S. Energy Information Administration (EIA) Indexed Site

    Portal, ND Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data...

  13. ,"New York Natural Gas Pipeline and Distribution Use Price (Dollars...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic...

  14. Panel 2, Hydrogen Delivery in the Natural Gas Pipeline Network

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in the Natural Gas Pipeline Network DOE'S HYDROGEN ENERGY STORAGE FOR GRID AND TRANSPORTATION SERVICES WORKSHOP Sacramento, CA May 14, 2014 Brian Weeks Gas Technology Institute 2 2...

  15. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Barriers: Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) hpwgwembrittlementsteelssofronis.pdf More Documents & Publications Webinar: I2CNER: An...

  16. Sequencing Technologies and Computational pipelines at the JGI

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sequencing Technologies and Computational pipelines at the JGI September 17, 2013 JGI logo 2 James Han, JGI sequencing QAQC group lead Tuesday, Sep. 17, 2003 OSF Room 238...

  17. EIA - Natural Gas Pipeline Network - Aquifer Storage Reservoir...

    Gasoline and Diesel Fuel Update (EIA)

    Configuration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Aquifer Underground Natural Gas Storage...

  18. EIA - Natural Gas Pipeline Network - Depleted Reservoir Storage...

    Gasoline and Diesel Fuel Update (EIA)

    Configuration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Depleted Production Reservoir Underground...

  19. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    SciTech Connect (OSTI)

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2008-02-29T23:59:59.000Z

    There is growing interest regarding the potential size of a future U.S. dedicated CO2 pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale. In trying to understand the potential scale of a future national CO2 pipeline network, comparisons are often made to the existing pipeline networks used to deliver natural gas and liquid hydrocarbons to markets within the U.S. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The data presented here suggest that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a significant obstacle for the commercial deployment of CCS technologies.

  20. A Dredging Knowledge-Base Expert System for Pipeline Dredges with Comparison to Field Data 

    E-Print Network [OSTI]

    Wilson, Derek Alan

    2011-02-22T23:59:59.000Z

    A Pipeline Analytical Program and Dredging Knowledge{Base Expert{System (DKBES) determines a pipeline dredge's production and resulting cost and schedule. Pipeline dredge engineering presents a complex and dynamic process necessary to maintain...

  1. Tool Path Planning Generation For Finish Machining of Freeform Surfaces in the Cybercut Process Planning Pipeline

    E-Print Network [OSTI]

    Wright, Paul K; Dornfeld, David; Sundararajan, V.; Misra, Debananda

    2007-01-01T23:59:59.000Z

    CYBERCUT PROCESS PLANNING PIPELINE Paul K. Wright, David A.describes part of a "Pipeline of De- sign and Manufacturingversus surface finish. 2.5D PIPELINE AND 3D SURFACES Figure

  2. Black Radicals Make for Bad Citizens: Undoing the Myth of the School to Prison Pipeline

    E-Print Network [OSTI]

    Sojoyner, Damien M

    2013-01-01T23:59:59.000Z

    December 13). Prison pipeline hits Black students harder,http://politic365.com/2012/12/13/prison-pipeline-hits-black-The school-to-prison pipeline: Structuring legal reform. New

  3. MetAMOS: a modular and open source metagenomic assembly and analysis pipeline

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    assembly and analysis pipeline. Genome Biology 2013 14:R2.assembly and analysis pipeline Todd J Treangen 1,2† , Sergeyassembly and analysis pipeline. MetAMOS represents an

  4. Beyond Myopic Inference in Big Data Pipelines Karthik Raman, Adith Swaminathan, Johannes Gehrke, Thorsten Joachims

    E-Print Network [OSTI]

    Joachims, Thorsten

    ]: Learning General Terms Algorithms, Experimentation, Theory Keywords Big Data Pipelines, Modular Design Detection & Recognition pipeline. creation, model construction, testing, and visualization. In orderBeyond Myopic Inference in Big Data Pipelines Karthik Raman, Adith Swaminathan, Johannes Gehrke

  5. The Oil Network in US:The Oil Network in US: A Closer Look at PipelinesA Closer Look at Pipelines

    E-Print Network [OSTI]

    Nagurney, Anna

    The Oil Network in US:The Oil Network in US: A Closer Look at PipelinesA Closer Look at Pipelines of Oil Network in USHistory of Oil Network in US Origin of pipelines:Origin of pipelines: WWII: Relied of transportationtransportation Need for a complex network:Need for a complex network: Move the raw materials (crude oils), from

  6. Panel: The Intersections of the IDEA and the School-to-Prison Pipeline (Audio file)

    E-Print Network [OSTI]

    Waterstone, Julie; Cannon, Yael; Rivera, Anna; Dudakia, Kunti

    2013-01-01T23:59:59.000Z

    as the School-to-Prison Pipeline-occurs, and will explorein the School-to-Prison Pipeline discourse will help the

  7. An Initial Evaluation of Characterization and Closure Options for Underground Pipelines within a Hanford Site Single-Shell Tank Farm - 13210

    SciTech Connect (OSTI)

    Badden, Janet W.; Connelly, Michael P. [Washington River Protection Services, P.O. Box 850, Richland, Washington, 99352 (United States)] [Washington River Protection Services, P.O. Box 850, Richland, Washington, 99352 (United States); Seeley, Paul N. [Cenibark International, Inc., 104318 Nicole Drive, Kennewick, Washington, 99338-7596 (United States)] [Cenibark International, Inc., 104318 Nicole Drive, Kennewick, Washington, 99338-7596 (United States); Hendrickson, Michelle L. [Washington State Department of Ecology, 3100 Port of Benton Blvd, Richland, Washington, 99354 (United States)] [Washington State Department of Ecology, 3100 Port of Benton Blvd, Richland, Washington, 99354 (United States)

    2013-07-01T23:59:59.000Z

    The Hanford Site includes 149 single-shell tanks, organized in 12 'tank farms,' with contents managed as high-level mixed waste. The Hanford Federal Facility Agreement and Consent Order requires that one tank farm, the Waste Management Area C, be closed by June 30, 2019. A challenge to this project is the disposition and closure of Waste Management Area C underground pipelines. Waste Management Area C contains nearly seven miles of pipelines and 200 separate pipe segments. The pipelines were taken out of service decades ago and contain unknown volumes and concentrations of tank waste residuals from past operations. To understand the scope of activities that may be required for these pipelines, an evaluation was performed. The purpose of the evaluation was to identify what, if any, characterization methods and/or closure actions may be implemented at Waste Management Area C for closure of Waste Management Area C by 2019. Physical and analytical data do not exist for Waste Management Area C pipeline waste residuals. To develop estimates of residual volumes and inventories of contamination, an extensive search of available information on pipelines was conducted. The search included evaluating historical operation and occurrence records, physical attributes, schematics and drawings, and contaminant inventories associated with the process history of plutonium separations facilities and waste separations and stabilization operations. Scoping analyses of impacts to human health and the environment using three separate methodologies were then developed based on the waste residual estimates. All analyses resulted in preliminary assessments, indicating that pipeline waste residuals presented a comparably low long-term impact to groundwater with respect to soil, tank and other ancillary equipment residuals, but exceeded Washington State cleanup requirement values. In addition to performing the impact analyses, the assessment evaluated available sampling technologies and pipeline removal or treatment technologies. The evaluation accounted for the potential high worker risk, high cost, and schedule impacts associated with characterization, removal, or treatment of pipelines within Waste Management Area C for closure. This assessment was compared to the unknown, but estimated low, long-term impacts to groundwater associated with remaining waste residuals should the pipelines be left 'as is' and an engineered surface barrier or landfill cap be placed. This study also recommended that no characterization or closure actions be assumed or started for the pipelines within Waste Management Area C, likewise with the premise that a surface barrier or landfill cap be placed over the pipelines. (authors)

  8. Materials Solutions for Hydrogen Delivery in Pipelines

    SciTech Connect (OSTI)

    Ningileri, Shridas T.; Boggess, Todd A; Stalheim, Douglas

    2013-01-02T23:59:59.000Z

    The main objective of the study is as follows: Identify steel compositions/microstructures suitable for construction of new pipeline infrastructure and evaluate the potential use of the existing steel pipeline infrastructure in high pressure gaseous hydrogen applications. The microstructures of four pipeline steels were characterized and tensile testing was conducted in gaseous hydrogen and helium at pressures of 5.5 MPa (800 psi), 11 MPa (1600 psi) and 20.7 MPa (3000 psi). Based on reduction of area, two of the four steels that performed the best across the pressure range were selected for evaluation of fracture and fatigue performance in gaseous hydrogen at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi). The basic format for this phase of the study is as follows: Microstructural characterization of volume fraction of phases in each alloy; Tensile testing of all four alloys in He and H{sub 2} at 5.5 MPa (800 psi), 11 MPa (1600 psi), and 20.7 MPa (3000 psi). RA performance was used to choose the two best performers for further mechanical property evaluation; Fracture testing (ASTM E1820) of two best tensile test performers in H{sub 2} at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi); Fatigue testing (ASTM E647) of two best tensile test performers in H2 at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi) with frequency =1.0 Hz and R-ratio=0.5 and 0.1.

  9. Praxair extending hydrogen pipeline in Southeast Texas

    SciTech Connect (OSTI)

    Not Available

    1992-08-24T23:59:59.000Z

    This paper reports that Praxair Inc., an independent corporation created by the spinoff of Union Carbide Corp.'s Linde division, is extending its high purity hydrogen pipeline system from Channelview, Tex., to Port Arthur, Tex. The 70 mile, 10 in. extension begins at a new pressure swing adsorption (PSA) purification unit next to Lyondell Petrochemical Co.'s Channelview plant. The PSA unit will upgrade hydrogen offgas from Lyondell's methanol plant to 99.99% purity hydrogen. The new line, advancing at a rate of about 1 mile/day, will reach its first customer, Star Enterprise's 250,000 b/d Port Arthur refinery, in September.

  10. The QUEST Data Processing Software Pipeline

    E-Print Network [OSTI]

    Peter Andrews; Charles Baltay; Anne Bauer; Nancy Ellman; Jonathan Jerke; Rochelle Lauer; David Rabinowitz; Julia Silge

    2007-03-16T23:59:59.000Z

    A program that we call the QUEST Data Processing Software Pipeline has been written to process the large volumes of data produced by the QUEST camera on the Samuel Oschin Schmidt Telescope at the Palomar Observatory. The program carries out both aperture and PSF photometry, combines data from different repeated observations of the same portion of sky, and produces a Master Object Catalog. A rough calibration of the data is carried out. This program, as well as the calibration procedures and quality checks on the output are described.

  11. EIA - Natural Gas Pipeline System - Southwest Region

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877Southwest Region About U.S. Natural Gas Pipelines

  12. Hydrogen Pipeline Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To:Department ofOral Testimony ofMonitoring, ProtectionofHydrogen Pipeline

  13. EIA - Natural Gas Pipeline Network - Regional Definitions

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization &

  14. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization &Overview

  15. EIA-812, Monthly Product Pipeline Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:DeploymentSite Name: Email: Terminal2, Monthly Product Pipeline

  16. Term-Level Verification of a Pipelined CISC Microprocessor

    E-Print Network [OSTI]

    Term-Level Verification of a Pipelined CISC Microprocessor Randal E. Bryant December, 2005 CMU verification, Microprocessor verification, UCLID #12;Abstract By abstracting the details of the data representations and operations in a microprocessor, term-level verification can formally prove that a pipelined

  17. TermLevel Verification of a Pipelined CISC Microprocessor

    E-Print Network [OSTI]

    Term­Level Verification of a Pipelined CISC Microprocessor Randal E. Bryant December, 2005 CMU verification, Microprocessor verification, UCLID #12; Abstract By abstracting the details of the data representations and operations in a microprocessor, term­level verification can formally prove that a pipelined

  18. Accelerating Pipelined Integer and Floating-Point Accumulations in Configurable

    E-Print Network [OSTI]

    Martonosi, Margaret

    Accelerating Pipelined Integer and Floating-Point Accumulations in Configurable Hardware addition until the end of a repeated calculation such as accumulation or dot- product; this effectively and floating- point designs that use our technique. Our pipelined integer multiply-accumulate (MAC) design

  19. How Safe Are Pipelines? Diana Furchtgott-Roth

    E-Print Network [OSTI]

    Calgary, University of

    18% 11% 14% 26% Natural Gas Distribution 25% 78% 76% 15% Hazardous Liquid 55% 11% 9% 53% #12;NumberHow Safe Are Pipelines? Diana Furchtgott-Roth Director, Economics21, Manhattan Institute Moving-Miles Transported: Petroleum Pipeline and Class I Rail Source: "Final Supplemental Environmental Impact Statement

  20. Rapid communication Mapping urban pipeline leaks: Methane leaks across Boston

    E-Print Network [OSTI]

    Jackson, Robert B.

    transmission and distribution pipelines for natural gas in the U. S. cause an average of 17 fatalities, 68 signatures w20& lighter (m ź Ŕ57.8&, Ć1.6& s.e., n ź 8). Repairing leaky natural gas distribution systems injuries, and $133 M in property damage each year (PHMSA, 2012). A natural gas pipeline explosion in San

  1. ABB Review 4/2000 55 ultiphase pipelines connecting

    E-Print Network [OSTI]

    Skogestad, Sigurd

    ABB Review 4/2000 55 ultiphase pipelines connecting remote wellhead platforms and subsea wells of the multi-phase pipelines connecting wells and remote installations to the processing unit. One common form and unstable, it is difficult to predict the pressure drop, heat and mass transfer. In addition, the flow

  2. Pipelined Mutual Exclusion and The Design of an Asynchronous Microprocessor *

    E-Print Network [OSTI]

    Martin, Alain

    RVM46 -1 Pipelined Mutual Exclusion and The Design of an Asynchronous Microprocessor * Rajit; Pipelining; Microprocessor design; Program transformation. 1. Introduction Formal transformations are an e#11 by construction [3]. In the design of asynchronous systems, it is important to be able to decouple various parts

  3. Natural Gas Pipeline Leaks Across Washington, DC Robert B. Jackson,,,

    E-Print Network [OSTI]

    Jackson, Robert B.

    Natural Gas Pipeline Leaks Across Washington, DC Robert B. Jackson,,, * Adrian Down, Nathan G increased in recent decades, but incidents involving natural gas pipelines still cause an average of 17 fatalities and $133 M in property damage annually. Natural gas leaks are also the largest anthropogenic

  4. A Pipelined Turbo Decoder with Random Convolutional Interleaver Werner Henkel

    E-Print Network [OSTI]

    Henkel, Werner

    A Pipelined Turbo Decoder with Random Convolutional Interleaver Werner Henkel University of Applied: jusif, sayirÂĄ @ftw.at Abstract-- This paper describes a pipelined iterative decoder ("Turbo" decoder. INTRODUCTION SINCE the introduction of "Turbo" codes in 1993 [1] the coding community has put much effort

  5. Statistical Methods for Estimating the Minimum Thickness Along a Pipeline

    E-Print Network [OSTI]

    along the pipeline can be used to estimate corrosion levels. The traditional parametric model method for this problem is to estimate parameters of a specified corrosion distribution and then to use these parameters companies use pipelines to transfer oil, gas and other materials from one place to another. Manufactures

  6. Free Energy Code Online Discussion

    E-Print Network [OSTI]

    Free Energy Code Online Discussion for Building Department Personnel Join us for this FREE 90 Bruce Cheney from Anchors Aweigh Energy, LLC want to hear from YOU on residential HVAC changeout issues of the California Energy Commission. Date: 3 dates currently offered, choose the one that works for you

  7. Conclusions 7.1 Discussion

    E-Print Network [OSTI]

    Rodríguez, Inmaculada

    the movement of human characters. In addition to realistic appearance, a virtual human should exhibit realisticChapter 7 Conclusions 7.1 Discussion During the last years, the evolution of realistic animation of virtual characters has been tackled from two directions of research. The first one involves facial

  8. Leak detection on an ethylene pipeline

    SciTech Connect (OSTI)

    Hamande, A.; Condacse, V.; Modisette, J.

    1995-12-31T23:59:59.000Z

    A model-based leak detection system has been in operation on the Solvay et Cie ethylene pipeline from Antwerp to Jemeppe on Sambre since 1989. The leak detection system, which is the commercial product PLDS of Modisette Associations, Inc., was originally installed by the supplier. Since 1991, all system maintenance and configuration changes have been done by Solvay et Cie personnel. Many leak tests have been performed, and adjustments have been made in the configuration and the automatic tuning parameters. The leak detection system is currently able to detect leaks of 2 tonnes/hour in 11 minutes with accurate location. Larger leaks are detected in about 2 minutes. Leaks between 0.5 and 1 tonne per hour are detected after several hours. (The nominal mass flow in the pipeline is 15 tonnes/hour, with large fluctuations.) Leaks smaller than 0.5 tonnes per hour are not detected, with the alarm thresholds set at levels to avoid false alarms. The major inaccuracies of the leak detection system appear to be associated with the ethylene temperatures.

  9. From {open_quotes}command and control{close_quotes} to risk management: The evolution of the federal natural gas pipeline safety program

    SciTech Connect (OSTI)

    Biancardi, P.; Bogardus, L.M.

    1995-12-31T23:59:59.000Z

    The pipeline industry essentially accepted the passage of the NGPSA in 1968 because it would provide one set of uniform regulations under the shield of federal preemption, thus relieving industry from the impossible burden of complying with inconsistent state and local requirements. The program developed, however, in response to the public`s misperception of infrequent but highly publicized accidents, rather than as a result of rational evaluation of actual pipeline safety risks. Like other federal agencies, the DOT has begun to reassess this method of regulation and today has a new vision of pipeline safety regulation. The DOT has embarked on a regulatory experiment which requires government-industry partnerships, greater public participation, and risk-based regulations. Whether or not this experiment succeeds, the DOT deserves credit for seeking new and innovative approaches to regulating the pipeline industry.

  10. MEASURING TRANSIT SIGNAL RECOVERY IN THE KEPLER PIPELINE. I. INDIVIDUAL EVENTS

    SciTech Connect (OSTI)

    Christiansen, Jessie L.; Clarke, Bruce D.; Burke, Christopher J.; Jenkins, Jon M.; Haas, Michael R.; Seader, Shawn; Smith, Jeffrey Claiborne; Tenenbaum, Peter; Twicken, Joseph D.; Thompson, Susan E. [SETI Institute/NASA Ames Research Center, M/S 244-30, Moffett Field, CA 94035 (United States); Barclay, Thomas S. [Bay Area Environmental Research Institute/NASA Ames Research Center, M/S 244-30, Moffett Field, CA 94035 (United States); Ford, Eric B. [Astronomy Department, University of Florida, 211 Bryant Space Sciences Center, Gainesville, FL 32111 (United States); Sabale, Anima; Uddin, Akm Kamal, E-mail: jessie.l.christiansen@nasa.gov [Orbital Sciences Corporation/NASA Ames Research Center, Moffett Field, CA 94035 (United States)

    2013-08-15T23:59:59.000Z

    The Kepler mission was designed to measure the frequency of Earth-size planets in the habitable zone of Sun-like stars. A crucial component for recovering the underlying planet population from a sample of detected planets is understanding the completeness of that sample-the fraction of the planets that could have been discovered in a given data set that actually were detected. Here, we outline the information required to determine the sample completeness, and describe an experiment to address a specific aspect of that question, i.e., the issue of transit signal recovery. We investigate the extent to which the Kepler pipeline preserves individual transit signals by injecting simulated transits into the pixel-level data, processing the modified pixels through the pipeline, and comparing the measured transit signal-to-noise ratio (S/N) to that expected without perturbation by the pipeline. We inject simulated transit signals across the full focal plane for a set of observations for a duration of 89 days. On average, we find that the S/N of the injected signal is recovered at MS = 0.9973({+-} 0.0012) Multiplication-Sign BS - 0.0151({+-} 0.0049), where MS is the measured S/N and BS is the baseline, or expected, S/N. The 1{sigma} width of the distribution around this correlation is {+-}2.64%. This indicates an extremely high fidelity in reproducing the expected detection statistics for single transit events, and provides teams performing their own periodic transit searches the confidence that there is no systematic reduction in transit signal strength introduced by the pipeline. We discuss the pipeline processes that cause the measured S/N to deviate significantly from the baseline S/N for a small fraction of targets; these are primarily the handling of data adjacent to spacecraft re-pointings and the removal of harmonics prior to the measurement of the S/N. Finally, we outline the further work required to characterize the completeness of the Kepler pipeline.

  11. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    SciTech Connect (OSTI)

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2009-04-20T23:59:59.000Z

    There is growing interest regarding the potential size of a future U.S. dedicated carbon dioxide (CO2) pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale within the United States. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies (so called WRE450 and WRE550 stabilization scenarios) and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The analysis reveals that between 11,000 and 23,000 additional miles of dedicated CO2 pipeline might be needed in the U.S. before 2050 across these two cases. While that is a significant increase over the 3,900 miles that comprise the existing national CO2 pipeline infrastructure, it is critically important to realize that the demand for additional CO2 pipeline capacity will unfold relatively slowly and in a geographically dispersed manner as new dedicated CCS-enabled power plants and industrial facilities are brought online. During the period 2010-2030, the growth in the CO2 pipeline system is on the order of a few hundred to less than a thousand miles per year. In comparison during the period 1950-2000, the U.S. natural gas pipeline distribution system grew at rates that far exceed these projections in growth in a future dedicated CO2 pipeline system. This analysis indicates that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a major obstacle for the commercial deployment of CCS technologies in the U.S. Nevertheless, there will undoubtedly be some associated regulatory and siting issues to work through but these issues should not be unmanageable based on the size of infrastructure requirements alone.

  12. A Low Power, and low signal 5-bit 25Msamples/s Pipelined ADC for Monolithic Active Pixels.

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Low Power, and low signal 5-bit 25Msamples/s Pipelined ADC for Monolithic Active Pixels. J (3) Abstract­ For CMOS monolithic active pixels sensor readout, we developed a 5 bit low power analog in future by an ADC. The latter needs to fit the column width, which amounts to 25ľm at present, and should

  13. Online Pipeline Transportation of Petroleum Products with no Due Dates 1

    E-Print Network [OSTI]

    Endler, Markus

    On­line Pipeline Transportation of Petroleum Products with no Due Dates 1 Ruy Luiz Milidi'u milidiu; 1 Introduction Petroleum products are typically transported through pipelines. Pipelines, 2001 Abstract: In this paper, we introduce a new model for pipeline transportation of petroleum

  14. Technoeconomic Analysis of Biomethane Production from Biogas and Pipeline Delivery (Presentation)

    SciTech Connect (OSTI)

    Jalalzadeh-Azar, A.

    2010-10-18T23:59:59.000Z

    This presentation summarizes "A Technoeconomic Analysis of Biomethane Production from Biogas and Pipeline Delivery".

  15. A Reconfigurable, On-The-Fly, Resource-Aware, Streaming Pipeline Scheduler

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    that create pipelines that are fully aware of the system's resources. In this paper, we present the design not offer enough expressiveness to cover all pipelines that can be constructed. Fully automated efficient pipeline construction presents multiple challenges. Some systems5, 17­19 build the pipeline on

  16. A Reconfigurable, OnTheFly, ResourceAware, Streaming Pipeline Scheduler

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    that create pipelines that are fully aware of the system's resources. In this paper, we present the design not offer enough expressiveness to cover all pipelines that can be constructed. Fully automated efficient pipeline construction presents multiple challenges. Some systems 5, 17--19 build the pipeline on

  17. The Pipeline Design Pattern Allan Vermeulen, Gabe BegedDov, Patrick Thompson

    E-Print Network [OSTI]

    Schmidt, Douglas C.

    1 The Pipeline Design Pattern Allan Vermeulen, Gabe Beged­Dov, Patrick Thompson ă Copyright Rogue in the processing pipeline. For example, the Web browser pipeline can be constructed in various ways depending Wave Software, Inc., 1995 Intent Build data pipelines in a configurable and typesafe manner. Motivation

  18. WTP Communications Strategy Discussion Topics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrincetonUsing Maps1DOE Awards ContractRebuttalCaseDiscussion Topics

  19. A Low-Cost Natural Gas/Freshwater Aerial Pipeline

    E-Print Network [OSTI]

    Alexander Bolonkin; Richard Cathcart

    2007-01-05T23:59:59.000Z

    Offered is a new type of low-cost aerial pipeline for delivery of natural gas, an important industrial and residential fuel, and freshwater as well as other payloads over long distances. The offered pipeline dramatically decreases the construction and operation costs and the time necessary for pipeline construction. A dual-use type of freight pipeline can improve an arid rural environment landscape and provide a reliable energy supply for cities. Our aerial pipeline is a large, self-lofting flexible tube disposed at high altitude. Presently, the term "natural gas" lacks a precise technical definition, but the main components of natural gas are methane, which has a specific weight less than air. A lift force of one cubic meter of methane equals approximately 0.5 kg. The lightweight film flexible pipeline can be located in the Earth-atmosphere at high altitude and poses no threat to airplanes or the local environment. The authors also suggest using lift force of this pipeline in tandem with wing devices for cheap shipment of a various payloads (oil, coal and water) over long distances. The article contains a computed macroproject in northwest China for delivery of 24 billion cubic meter of gas and 23 millions tonnes of water annually.

  20. cuInspiral: prototype gravitational waves detection pipeline fully coded on GPU using CUDA

    E-Print Network [OSTI]

    Leone B. Bosi

    2010-06-16T23:59:59.000Z

    In this paper we report the prototype of the first coalescing binary detection pipeline fully implemented on NVIDIA GPU hardware accelerators. The code has been embedded in a GPU library, called cuInspiral and has been developed under CUDA framework. The library contains for example a PN gravitational wave signal generator, matched filtering/FFT and detection algorithms that have been profiled and compared with the corresponding CPU code with dedicated benchmark in order to provide gain factor respect to the standard CPU implementation. In the paper we present performances and accuracy results about some of the main important elements of the pipeline, demonstrating the feasibility and the chance of obtain an impressive computing gain from these new many-core architectures in the perspective of the second and third generations of gravitational wave detectors.

  1. A Pipeline Transport Correlation for Slurries with Small but Dense Particles

    SciTech Connect (OSTI)

    Poloski, Adam P.; Etchells, Arthur W.; Chun, Jaehun; Adkins, Harold E.; Casella, Andrew M.; Minette, Michael J.; Yokuda, Satoru T.

    2010-04-01T23:59:59.000Z

    Most correlations/models for minimum transport or critical velocity of slurry were developed for slurries composed of particles greater than ~100-200 ?m diameter with narrow particle-size distributions which is typical of the minerals industry. Many other process industries handle smaller particles. In particular waste slurries at the U.S. Department of Energy's Hanford Site have broad size distributions and significant fractions of smaller particles. Despite the size of these wastes, recent PNNL studies indicate that the small particles might be of sufficient density to pose a significant risk for pipeline deposition and plugging. To allow predictive assessment of deposition of fine dense particles for waste slurry transport at the U.S. DOE Hanford site, a pipeline-transport correlation for critical velocity was developed using a simple power-law between two dimensionless numbers important for slurry transport, the deposition Froude and Archimedes numbers. The correlation accords well with experimental data for slurries with Archimedes numbers <80 and is an adequate pipeline design guide for processing Hanford waste slurry.

  2. Extending the Fermi-LAT Data Processing Pipeline to the Grid

    E-Print Network [OSTI]

    Stephan Zimmer; Luisa Arrabito; Tom Glanzman; Tony Johnson; Claudia Lavalley; Andrei Tsaregorodtsev

    2012-12-17T23:59:59.000Z

    The Data Handling Pipeline ("Pipeline") has been developed for the Fermi Gamma-Ray Space Telescope (Fermi) Large Area Telescope (LAT) which launched in June 2008. Since then it has been in use to completely automate the production of data quality monitoring quantities, reconstruction and routine analysis of all data received from the satellite and to deliver science products to the collaboration and the Fermi Science Support Center. Aside from the reconstruction of raw data from the satellite (Level 1), data reprocessing and various event-level analyses are also reasonably heavy loads on the pipeline and computing resources. These other loads, unlike Level 1, can run continuously for weeks or months at a time. In addition it receives heavy use in performing production Monte Carlo tasks. The software comprises web-services that allow online monitoring and provides charts summarizing work flow aspects and performance information. The server supports communication with several batch systems such as LSF and BQS and recently also Sun Grid Engine and Condor. This is accomplished through dedicated job control services that for Fermi are running at SLAC and the other computing site involved in this large scale framework, the Lyon computing center of IN2P3. While being different in the logic of a task, we evaluate a separate interface to the Dirac system in order to communicate with EGI sites to utilize Grid resources, using dedicated Grid optimized systems rather than developing our own. (abstract abridged)

  3. This article describes recent activities in the area of RF integrated circuits First, transceiver architectures developed for cellular and cordless telephone standards are presented. Next, the choice of device technology is discussed, and the design of bu

    E-Print Network [OSTI]

    Razavi, Behzad

    , the choice of device technology is discussed, and the design of building blocks such as low-noise amplifiers (formerly AT&T Microelectron- ics) offers a single-chip solution that, along with a low-noise amplifier (LNA and mixers, oscillators, and power amplifiers is described. Last, some of the emerging applications of RF

  4. Discussion Article Exploratory Data Analysis

    E-Print Network [OSTI]

    Buja, Andreas

    -mail: gelman@stat.columbia.edu). Š2004 American Statistical Association, Institute of Mathematical Statistics under an implicit or explicit statistical model. For example, many of Tukey's methods can be interpreted formal statistical methods based on probability models. These ideas are developed in the context

  5. Session: Discussion of Research Needs

    SciTech Connect (OSTI)

    anon.

    2004-09-01T23:59:59.000Z

    This final session at the Wind Energy and Birds/Bats workshop was lead by a facilitator who asked participants for their overall reaction to the research that had been presented during the workshop. Questions addressed by workshop participants included: how do you develop trust and confidence in the research, what are some of the specific gaps in our understanding of wind energy's impact on birds and bats; how do we prioritize and proceed with closing the data/research gaps; how do we connect the dots and bring various research and mapping efforts together; given gaps in the data, what are the critical questions we need to answer to make project decisions now; and, how do we track/influence the policies that will shape wind energy development. Conclusions reached regarding these questions are included in summary form.

  6. Note: The content of this report is premised on industry interviews that were conducted prior to September 2011 and do not reflect discussions, initiatives, activities, or developments that are subsequently taking place within the

    E-Print Network [OSTI]

    The following are the overarching themes that emerged from the interviews. Generally, the private sector should the organization has core competency and expertise, namely: standards development, metrology, cybersecurity given to it should not be increased. Development of cybersecurity standards and other related research

  7. The Role of Peer Support for Girls and Women in the STEM Pipeline: Promoting Identification with STEM and Mitigating the Negative Effects of Sexism

    E-Print Network [OSTI]

    Robnett, Rachael

    2013-01-01T23:59:59.000Z

    AND WOMEN IN THE STEM PIPELINE: PROMOTING IDENTIFICATIONand Women in the STEM Pipeline: Promoting Identificationand Women in the STEM Pipeline: Promoting Identification

  8. Ductile fracture and structural integrity of pipelines & risers

    E-Print Network [OSTI]

    Kofiani, Kirki N. (Kirki Nikolaos)

    2013-01-01T23:59:59.000Z

    The Oil and Gas (O&G) industry has recently turned its interest towards deep and ultra-deep offshore installations in order to address the global increase of energy demand. Pipelines and risers are key components for the ...

  9. Simulation effectively sites surge-relief facilities on Saudi pipeline

    SciTech Connect (OSTI)

    Dempsey, J.J.; Al-Gouhi, A.H. (Saudi Arabian Oil Co., Dhahrain (Saudi Arabia))

    1993-09-20T23:59:59.000Z

    Pipeline hydraulic and surge analysis studies of the Saudi Aramco East-West crude-oil pipeline assisted in expanding the system's capacity by 50%. Surge studies predicted that operational upsets, such as the trip of a pump station, cause excessive surge pressures in the pipeline system at new flow rates. Additional surge studies showed that surge-relief stations must be located downstream from each of six pump stations. The new surge-relief stations and an increase in capacity of existing surge-relief stations protect the pipelines at the higher flow rates. The paper describes modeling the system, the analysis of the hydraulics, surge analysis, acoustic transit times, relief valve simulation, surge-relief protection, surge-relief stations, station locations, simulation results, tank sizing, and valve testing.

  10. Special Provisions Affecting Gas, Water, or Pipeline Companies (South Carolina)

    Broader source: Energy.gov [DOE]

    This legislation confers the rights and privileges of telegraph and telephone companies (S.C. Code 58-9) on pipeline and water companies, and contains several additional provisions pertaining to...

  11. Structural Genomics of Minimal Organisms: Pipeline and Results

    E-Print Network [OSTI]

    Kim, Sung-Hou

    2008-01-01T23:59:59.000Z

    of recombinant proteins. J. Struct. Funct. Genomics 5:69-74.proteins. J. Struct. Funct. Genomics 5:69-74. Oganesyan,Structural Genomics of Minimal Organisms: Pipeline and

  12. Calculating Horsepower Requirements and Sizing Supply Pipelines for Irrigation 

    E-Print Network [OSTI]

    Fipps, Guy

    1995-09-05T23:59:59.000Z

    Pumping costs are often one of the largest single expenses in irrigated agriculture. This publication explains how to lower pumping costs by calculating horsepower requirements and sizing supply pipelines correctly. Examples take the reader through...

  13. Analysis of Subsea Buried Pipelines and Partially Buried Cables 

    E-Print Network [OSTI]

    Bai, Yanbin

    2014-08-26T23:59:59.000Z

    This research investigation addresses the analysis and numerical simulation of two very important offshore engineering problems. The first deals with the modeling of the steady state thermal field around buried pipelines conveying high temperature...

  14. Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin)

    Broader source: Energy.gov [DOE]

    Any utility proposing to construct a natural gas pipeline requiring a Certificate of Authority (CA) under Wis. Stat. §196.49 must prepare an application for Commission review.  These regulations ...

  15. Extensible microprocessor without interlocked pipeline stages (emips), the reconfigurable microprocessor

    E-Print Network [OSTI]

    Pittman, Richard Neil

    2007-09-17T23:59:59.000Z

    have called our dynamically extensible microprocessor design the Extensible Microprocessor without Interlocked Pipeline Stages, or eMIPS. The eMIPS architecture uses the interaction of fixed and configurable logic available in modern...

  16. "Assessment of the Adequacy of Natural Gas Pipeline Capacity...

    Broader source: Energy.gov (indexed) [DOE]

    its "Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States" report. The report is now available for downloading. In 2005-06, the Office of...

  17. EIA - Natural Gas Pipeline Network - Natural Gas Supply Basins...

    U.S. Energy Information Administration (EIA) Indexed Site

    Corridors About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Supply Basins Relative to Major Natural...

  18. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation by 09-Sofronis to DOE Hydrogen Pipeline R&D Project Review Meeting held January 5-6, 2005 at Oak Ridge National Laboratory in Oak Ridge, Tennessee....

  19. Discussions | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORTEnergy OffshoreDeveloper - Q & A HomeDifko Vind A

  20. The quality assurance of heat fused thermoplastic pipeline joints 

    E-Print Network [OSTI]

    Earles, Larry Lee

    1982-01-01T23:59:59.000Z

    THE QUALITY ASSURANCE OF HEAT FUSED THERMOPLASTIC PIPELINE JOINTS A Thesis by LARRY LEE EARLES Submitted to the Graduate College of Texas A&M University in partial fulfillment for the requirements for the degree of MASTER OF SCIENCE... December 1982 Major Subject: Mechanical Engineering THE QUALITY ASSURANCE OF HEAT FUSED THERMOPLASTIC PIPELINE JOINTS A Thesis LARRY LEE EARLES Approved as to style and content by: Mario A. Colaluca (Chairman of Committee) Carl Gerhold (Member...

  1. The liquefied natural gas pipeline: a system study 

    E-Print Network [OSTI]

    Hazel, Thomas Ray

    1972-01-01T23:59:59.000Z

    THE LIQUEFIED NATURAL GAS PIPELINE: A SYSTEM STUDY A Thesis by THOMAS RAY HAZEL Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1972 Major Subject...: Mechanical Engineering THE LIQUEFIED NATURAL GAS PIPELINE: A SYSTEM STUDY A Thesis by THOMAS RAY HAZEL Approved as to style and content by: Chairman o 'Committee) (Head of Department) (Member) (Member) (Member) (Member) (Member) May 1972 ABSTRACT...

  2. Modeling fatique behavior of dents in petroleum pipelines

    E-Print Network [OSTI]

    Hoffmann, Roger Lynn

    1997-01-01T23:59:59.000Z

    MODELING FATIGUE BEHAVIOR OF DENTS IN PETROLEUM PIPELINES A Thesis by ROGER LYNN HOFFMANN Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... August 1997 Major Subject: Civil Engineering MODELING FATIGUE BEHAVIOR OF DENTS IN PETROLEUM PIPELINES A Thesis by ROGER LYNN HOFFMANN Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER...

  3. The liquefied natural gas pipeline: a system study

    E-Print Network [OSTI]

    Hazel, Thomas Ray

    1972-01-01T23:59:59.000Z

    THE LIQUEFIED NATURAL GAS PIPELINE: A SYSTEM STUDY A Thesis by THOMAS RAY HAZEL Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1972 Major Subject...: Mechanical Engineering THE LIQUEFIED NATURAL GAS PIPELINE: A SYSTEM STUDY A Thesis by THOMAS RAY HAZEL Approved as to style and content by: Chairman o 'Committee) (Head of Department) (Member) (Member) (Member) (Member) (Member) May 1972 ABSTRACT...

  4. The Economics of the Nord Stream Pipeline System

    E-Print Network [OSTI]

    Chyong, Chi Kong; Noël, Pierre; Reiner, David M.

      to  those  set  by  the  Polish  energy regulator  for  the Yamal?Europe pipeline  in Poland (€1.108/tcm/100km  in 2009) (A'LEMAR, 2009... The Economics of the Nord Stream Pipeline System Chi Kong Chyong, Pierre Noël and David M. Reiner September 2010 CWPE 1051 & EPRG 1026 www.eprg.group.cam.ac.uk E P R G W O R K IN G P A P E R Abstract...

  5. A Novel MagPipe Pipeline transportation system using linear motor drives

    SciTech Connect (OSTI)

    Fang, J.R.; Montgomery, D.B.; Roderick, L. [Magplane Technology Inc., Littleton, MA (United States)

    2009-11-15T23:59:59.000Z

    A novel capsule pipeline transportation system using linear motor drives, called Magplane MagPipe, is under development with the intention to replace trucks and railways for hauling materials from the mine to the rail head, power plant, or processing plant with reduced operating cost and energy consumption. The initial demonstration of a MagPipe line in Inner Mongolia will be a 500-m-long double-pipe coal transport system with the design transportation capacity of 3 Mega-Mg per year. The pipeline consists of 6-m-long plastic pipe modules with an I-beam suspension system inside the pipe to carry sets of five coupled capsules. The pipe will also contain noncontinuous motor winding modules spaced at 50-m intervals. A set of Halbach-arrayed permanent magnets on the bottom of the capsules interact with the linear motor windings to provide propulsion. The motor is driven by variable frequency drives outside the pipe to control the speed. This paper briefly describes the overall MagPipe pipeline transportation system, including the preliminary conclusions of the linear synchronous motor analysis.

  6. Capsule Pipeline Research Center. 3-year Progress report, September 1, 1993--August 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    The Capsule Pipeline Research Center is devoted to performing research in capsule pipelines so that this emerging technology can be developed for early use to transport solids including coal, grain, other agricultural products, solid wastes, etc. Important research findings and accomplishments during the first-three years include: success in making durable binderless coal logs by compaction, success in underwater extrusion of binderless coal logs, success in compacting and extruding coal logs with less than 3% hydrophobic binder at room temperature, improvement in the injection system and the pump-bypass scheme, advancement in the state-of-the-art of predicting the energy loss (pressure drop) along both stationary and moving capsules, demonstrated the effectiveness of using polymer for drag reduction in CLP, demonstrated the influence of zeta potential on coal log fabrication, improved understanding of the water absorption properties of coal logs, better understanding of the mechanism of coal log abrasion (wear), completed a detailed economic evaluation of the CLP technology and compared coal transportation cost by CLP to that by rail, truck and slurry pipelines, and completion of several areas of legal research. The Center also conducted important technology transfer activities including workshops, work sessions, company seminars, involvement of companies in CLP research, issuance of newsletters, completion of a video tape on CLP, and presentation of research findings at numerous national and international meetings.

  7. Application of Graphics Processing Units to Search Pipeline for Gravitational Waves from Coalescing Binaries of Compact Objects

    E-Print Network [OSTI]

    Shin Kee Chung; Linqing Wen; David Blair; Kipp Cannon; Amitava Datta

    2010-05-17T23:59:59.000Z

    We report a novel application of graphics processing units (GPUs) for the purpose of accelerating the search pipelines for gravitational waves from coalescing binaries of compact objects. A speed-up of 16 fold has been achieved compared with a single central processing unit (CPU). We show that substantial improvements are possible and discuss the reduction in CPU count required for the detection of inspiral sources afforded by the use of GPUs.

  8. Will heat from the pipeline affect groundwater and surface water? Response by Professor James Goeke The temperature of a pipeline buried 4 feet would

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    of the pipeline as a way to check for leaks? Do you have any specific concerns regarding oil or natural gas1 Water Will heat from the pipeline affect groundwater and surface water? Response by Professor James Goeke ­ The temperature of a pipeline buried 4 feet would probably affect surface water

  9. TASSEL 3.0 / 4.0 Pipeline Command Line Interface: Guide to using Tassel Pipeline Terry Casstevens (tmc46@cornell.edu)

    E-Print Network [OSTI]

    Buckler, Edward S.

    1 TASSEL 3.0 / 4.0 Pipeline Command Line Interface: Guide to using Tassel Pipeline Terry Casstevens values via the command line. ./run_pipeline.pl -Xms512m -Xmx10g -fork1... Examples ./run to change the following line to use a ; instead of a :. my $CP = join(":", @fl); #12;2 To launch the Tassel

  10. DOE Hydrogen Transition Analysis Workshop Discussion Comments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop Discussion Comments, Questions, and Action Items DOE Hydrogen Transition Analysis Workshop Discussion Comments, Questions, and Action Items Discussion comments, questions,...

  11. Numerical solutions for determining wave-induced pressure distributions around buried pipelines

    E-Print Network [OSTI]

    Lai, Ngok-Wai

    1974-01-01T23:59:59.000Z

    Committee: Dr. Richard. F. Dominguez Numerical models using both the finite difference and i'inite element technique are developed to simulate the interaction of a two-dimensional pipe-soil-wave system. The wave-induced pressure distribution in the soil... in the soil media in the immediate vicinity of the pipelines. Numerical models using both the finite difference and. finite element technique are developed to simulate the pipe-soil-wave system. The dynamic damping of wave pressure through soil sediment...

  12. EIA - Natural Gas Pipeline Network - U.S. Natural Gas Pipeline Network Map

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline UtilizationProcess and

  13. In many application domains, Simulink/Stateflow serves as a platform for model-based development of the reactive embedded code, that interacts with its environment in real-time fashion. The talk will discuss a model-based ap-

    E-Print Network [OSTI]

    Stanley, Kenneth O.

    physical systems, sensors and their networks with application to agriculture, power systems and energy is a Fellow of the IEEE for contributions to discrete event system modeling, control, diagnosisIn many application domains, Simulink/Stateflow serves as a platform for model-based development

  14. Renewable Energy Pipeline Development Terms of Reference | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ | Roadmap JumpReliance IndustriesRenewable

  15. The LAMOST Stellar Parameter Pipeline at Peking University --- LSP3

    E-Print Network [OSTI]

    Xiang, Maosheng; Yuan, Haibo; Huang, Yang; Huo, Zhiying; Zhang, Huawei; Chen, Bingqiu; Zhang, Huihua; Sun, Ningchen; Wang, Chun; Zhao, Yongheng; Shi, Jianrong; Luo, Ali; Li, Guoping; Wu, Yue; Bai, Zongrui; Zhang, Yong; Hou, Yonghui; Yuan, Hailong; Li, Guangwei

    2014-01-01T23:59:59.000Z

    We introduce the LAMOST Stellar Parameter Pipeline at Peking University --- LSP3, developed and implemented for the determinations of radial velocity $V_{\\rm r}$ and stellar atmospheric parameters (effective temperature $T_{\\rm eff}$, surface gravity log\\,$g$, metallicity [Fe/H]) for the LAMOST Spectroscopic Survey of the Galactic Anti-center (LSS-GAC). We describe the algorithms of LSP3 and examine the accuracy of parameters yielded by it. The precision and accuracy of parameters yielded are investigated by comparing results of multi-epoch observations and of candidate members of open and globular clusters, with photometric calibration, as well as with independent determinations available from a number of external databases, including the PASTEL archive, the APOGEE, SDSS and RAVE surveys, as well as those released in the LAMOST DR1. The uncertainties of LSP3 parameters are characterized and quantified as a function of the spectral signal-to-noise ratio (SNR) and stellar atmospheric parameters. We conclude th...

  16. Compression station key to Texas pipeline project

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    This was probably the largest pipeline project in the US last year, and the largest in Texas in the last decade. The new compressor station is a key element in this project. TECO, its servicing dealer, and compression packager worked closely throughout the planning and installation stages of the project. To handle the amount of gas required, TECO selected the GEMINI F604-1 compressor, a four-throw, single-stage unit with a six-inch stroke manufactured by Weatherford Enterra Compression Co. (WECC) in Corpus Christi, TX. TECO also chose WECC to package the compressors. Responsibility for ongoing support of the units will be shared among TECO, the service dealer and the packager. TECO is sending people to be trained by WECC, and because the G3600 family of engines is still relatively new, both the Caterpillar dealer and WECC sent people for advanced training at Caterpillar facilities in Peoria, IL. As part of its service commitment to TECO, the servicing dealer drew up a detailed product support plan, encompassing these five concerns: Training, tooling; parts support; service support; and commissioning.

  17. Japanese Computing Center Discusses Potential Collaborations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Japanese Computing Center Discusses Potential Collaborations Japanese Computing Center Discusses Potential Collaborations February 26, 2011 Representatives from Japan's Tsukuba...

  18. Disproportionality fills in the gaps: Connections between achievement, discipline and special education in the School-to-Prison Pipeline

    E-Print Network [OSTI]

    Annamma, Subini; Morrison, Deb; Jackson, Darrell

    2014-01-01T23:59:59.000Z

    the school to prison pipeline. Journal of Law and EducationThe school-to-prison-pipeline: Structuring legal reform. New2005). School to prison pipeline. Retrieved from http://

  19. Leakage Risk Assessment of CO2 Transportation by Pipeline at the Illinois Basin Decatur Project, Decatur, Illinois

    E-Print Network [OSTI]

    Mazzoldi, A.

    2014-01-01T23:59:59.000Z

    S.M. , 2007, Natural Gas Pipeline Technology Overview.high-pressure natural- gas pipelines: J. Loss Prevention inrisk assessments of CO 2 pipelines, in Elsevier, ed. , 9th

  20. Three-dimensional morphology and gene expression in the Drosophila blastoderm at cellular resolution I: data acquisition pipeline

    E-Print Network [OSTI]

    2006-01-01T23:59:59.000Z

    I: data acquisition pipeline The electronic version of thiswe describe an integrated pipeline of methods for studyingA three-dimensional analysis pipeline To be able to analyze

  1. Qualification of Innovative High Level Waste Pipeline Unplugging Technologies

    SciTech Connect (OSTI)

    McDaniel, D.; Gokaltun, S.; Varona, J.; Awwad, A.; Roelant, D.; Srivastava, R. [Applied Research Center, Florida International University, Miami, FL (United States)

    2008-07-01T23:59:59.000Z

    In the past, some of the pipelines have plugged during high level waste (HLW) transfers resulting in schedule delays and increased costs. Furthermore, pipeline plugging has been cited by the 'best and brightest' technical review as one of the major issues that can result in unplanned outages at the Waste Treatment Plant causing inconsistent operation. As the DOE moves toward a more active high level waste retrieval, the site engineers will be faced with increasing cross-site pipeline waste slurry transfers that will result in increased probability of a pipeline getting plugged. Hence, availability of a pipeline unplugging tool/technology is crucial to ensure smooth operation of the waste transfers and in ensuring tank farm cleanup milestones are met. FIU had earlier tested and evaluated various unplugging technologies through an industry call. Based on mockup testing, two technologies were identified that could withstand the rigors of operation in a radioactive environment and with the ability to handle sharp 90 elbows. We present results of the second phase of detailed testing and evaluation of pipeline unplugging technologies and the objective is to qualify these pipeline unplugging technologies for subsequent deployment at a DOE facility. The current phase of testing and qualification comprises of a heavily instrumented 3-inch diameter (full-scale) pipeline facilitating extensive data acquisition for design optimization and performance evaluation, as it applies to three types of plugs atypical of the DOE HLW waste. Furthermore, the data from testing at three different lengths of pipe in conjunction with the physics of the process will assist in modeling the unplugging phenomenon that will then be used to scale-up process parameters and system variables for longer and site typical pipe lengths, which can extend as much as up to 19,000 ft. Detailed information resulting from the testing will provide the DOE end-user with sufficient data and understanding of the technology, and its limitations to aid in the benefit-cost analysis for management decision whether to deploy the technology or to abandon the pipeline as has been done in the past. In conclusion: The ultimate objective of this study is to qualify NuVision's unplugging technology for use at Hanford. Experimental testing has been conducted using three pipeline lengths and three types of blockages. Erosion rates have been obtained and pressure data is being analyzed. An amplification of the inlet pressure has been observed along the pipeline and is the key to determining up to what pipe lengths the technology can be used without surpassing the site pressure limit. In addition, we will attempt to establish what the expected unplugging rates will be at the longer pipe lengths for each of the three blockages tested. Detailed information resulting from the testing will provide the DOE end-user with sufficient data and understanding of the technology, and its limitations so that management decisions can be made whether the technology has a reasonable chance to successfully unplug a pipeline, such as a cross site transfer line or process transfer pipeline at the Waste Treatment Plant. (authors)

  2. Complexity analysis of pipeline mapping problems in distributed heterogeneous networks

    SciTech Connect (OSTI)

    Lin, Ying [University of Tennessee, Knoxville (UTK); Wu, Qishi [ORNL; Zhu, Mengxia [ORNL; Rao, Nageswara S [ORNL

    2009-04-01T23:59:59.000Z

    Largescale scientific applications require using various system resources to execute complex computing pipelines in distributed networks to support collaborative research. System resources are typically shared in the Internet or over dedicated connections based on their location, availability, capability, and capacity. Optimizing the network performance of computing pipelines in such distributed environments is critical to the success of these applications. We consider two types of largescale distributed applications: (1) interactive applications where a single dataset is sequentially processed along a pipeline; and (2) streaming applications where a series of datasets continuously flow through a pipeline. The computing pipelines of these applications consist of a number of modules executed in a linear order in network environments with heterogeneous resources under different constraints. Our goal is to find an efficient mapping scheme that allocates the modules of a pipeline to network nodes for minimum endtoend delay or maximum frame rate. We formulate the pipeline mappings in distributed environments as optimization problems and categorize them into six classes with different optimization goals and mapping constraints: (1) Minimum Endtoend Delay with No Node Reuse (MEDNNR), (2) Minimum Endtoend Delay with Contiguous Node Reuse (MEDCNR), (3) Minimum Endtoend Delay with Arbitrary Node Reuse (MEDANR), (4) Maximum Frame Rate with No Node Reuse or Share (MFRNNRS), (5) Maximum Frame Rate with Contiguous Node Reuse and Share (MFRCNRS), and (6) Maximum Frame Rate with Arbitrary Node Reuse and Share (MFRANRS). Here, 'contiguous node reuse' means that multiple contiguous modules along the pipeline may run on the same node and 'arbitrary node reuse' imposes no restriction on node reuse. Note that in interactive applications, a node can be reused but its resource is not shared. We prove that MEDANR is polynomially solvable and the rest are NP-complete. MEDANR, where either contiguous or noncontiguous modules in the pipeline can be mapped onto the same node, is essentially the Maximum n-hop Shortest Path problem, and can be solved using a dynamic programming method. In MEDNNR and MFRNNRS, any network node can be used only once, which requires selecting the same number of nodes for onetoone onto mapping. We show its NP-completeness by reducing from the Hamiltonian Path problem. Node reuse is allowed in MEDCNR, MFRCNRS and MFRANRS, which are similar to the Maximum n-hop Shortest Path problem that considers resource sharing. We prove their NP-completeness by reducing from the Disjoint-Connecting-Path Problem and Widest path with the Linear Capacity Constraints problem, respectively.

  3. Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues

    Fuel Cell Technologies Publication and Product Library (EERE)

    This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipeline

  4. Alternatives for reducing the environmental risks associated with natural disasters and their effects on pipelines 

    E-Print Network [OSTI]

    Wellborn, Michael Wayne

    1996-01-01T23:59:59.000Z

    Past pipeline failure reports have typically focused on corrosion and third party related events. However, natural disasters pose a substantial risk to pipeline integrity as well. Therefore, it was the objective of this thesis to analyze the risks...

  5. Behavioral modeling and digital calibration of pipeline analog to digital converters 

    E-Print Network [OSTI]

    Bilhan, Erkan

    2001-01-01T23:59:59.000Z

    This research focuses on digital calibration of pipeline analog to digital converters (ADCs) and also modeling of error sources and design parameters of pipeline ADCs. Modern applications such as communications systems require high resolution ADCs...

  6. Workgroup #2 Emerging Solutions and Technologies How can we keep the pipeline full of

    E-Print Network [OSTI]

    Workgroup #2 Emerging Solutions and Technologies ­ How can we keep the pipeline full of energy to keep the pipeline full of energy efficiency innovations for use in the Pacific Northwest." Our Phase 1

  7. Behavioral modeling and digital calibration of pipeline analog to digital converters

    E-Print Network [OSTI]

    Bilhan, Erkan

    2001-01-01T23:59:59.000Z

    This research focuses on digital calibration of pipeline analog to digital converters (ADCs) and also modeling of error sources and design parameters of pipeline ADCs. Modern applications such as communications systems require high resolution ADCs...

  8. Isolation valve selections play important role in pipelining

    SciTech Connect (OSTI)

    Hingoraney, R.; Goto, D.N. [Saudi Aramco, Dhahran (Saudi Arabia)

    1995-08-01T23:59:59.000Z

    Isolation valves are an integral part of every pipeline and play an important role in safe and proper operation. For almost every project, pipeline designers wrestle with choosing between the through-conduit gate valves and ball valves and their associated actuating mechanisms. Complicating this selection process are variables such as individual preferences and the lack of broad-based operating experience. As expected, there is no single valve and actuator combination that is correct for every pipeline or every application. Variables which must be considered and specifically evaluated for each valve installation include: operating characteristics, function, location, process fluid, materials options, space availability, maintenance, repair capability, delivery schedule, and costs. This paper reviews these issues.

  9. Use of intelligent pigs to detect stress corrosion cracking in gas pipelines

    SciTech Connect (OSTI)

    Culbertson, D.L. [Tenneco Energy, Houston, TX (United States)

    1996-08-01T23:59:59.000Z

    To ensure the integrity and serviceability of gas pipelines, operators periodically utilize intelligent pigging. This inspection technique has proven to be a cost effective approach for determining the condition of operating pipelines. Recent advancements in intelligent pigging technology are now aiding the pipeline industry in the detection of stress corrosion cracking.

  10. Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues

    SciTech Connect (OSTI)

    Melaina, M. W.; Antonia, O.; Penev, M.

    2013-03-01T23:59:59.000Z

    The United States has 11 distinct natural gas pipeline corridors: five originate in the Southwest, four deliver natural gas from Canada, and two extend from the Rocky Mountain region. This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines.

  11. Pipeline Transportation of Petroleum Products 1 Ruy Luiz Milidi'u

    E-Print Network [OSTI]

    Endler, Markus

    Pipeline Transportation of Petroleum Products 1 Ruy Luiz Milidi'u milidiu@inf.puc­rio.br Artur Introdution Petroleum products are typically transported in pipelines which are different from all other, 2000 Abstract: In this paper, we introduce a new model for pipeline transportation of petroleum

  12. Hydrogen Pipeline Safety Our goal is to establish the codes and standards necessary

    E-Print Network [OSTI]

    Perkins, Richard A.

    Hydrogen Pipeline Safety METALS Our goal is to establish the codes and standards necessary miles of hydrogen pipelines are currently in operation in the U.S. (compared to > 1M miles of natural, materials, mechanical properties, and standards for hydrogen pipelines. Construction is complete on the 750

  13. AROW A 128 Channel Analogue Pipeline with Wilkinson ADC and Sparsification ASIC

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    AROW ­ A 128 Channel Analogue Pipeline with Wilkinson ADC and Sparsification ASIC Authors: FS on a capacitor pipeline. A level­1 trigger is sent to the front end electronics from the trigger processorA/fC, giving a combined gain of approximately 100mV/MIP. .Analogue storage capacitor pipeline with differential

  14. Optimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments

    E-Print Network [OSTI]

    Kreinovich, Vladik

    p. If this probability exceeds a certain regulated (small) threshold p 0 , the pipeline must. To be on the safe side, regulations require that a pipeline be repaired when it is possible that p â?? p 0 , iOptimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments Cesar J

  15. Optimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments

    E-Print Network [OSTI]

    Kreinovich, Vladik

    p. If this probability exceeds a certain regulated (small) threshold p0, the pipeline must. To be on the safe side, regulations require that a pipeline be repaired when it is possible that p p0, i.e., when pOptimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments Cesar J

  16. Automatic Modeling and Validation of Pipeline Specifications driven by an Architecture Description Language

    E-Print Network [OSTI]

    Mishra, Prabhat

    ) design process. Many existing approaches employ a bottom-up approach to pipeline validation, where about the behavior of the pipelined ar- chitecture through ADL constructs, which allows a powerful topAutomatic Modeling and Validation of Pipeline Specifications driven by an Architecture Description

  17. An Automatic Image Reduction Pipeline for the Advanced Camera for Surveys

    E-Print Network [OSTI]

    Johns Hopkins University, Department of Physics and Astonomy, Advanced Camera for Surveys Team

    are constructed similar to those used in STScI OPUS pipeline. Reading and manipulation of FITS images and tables and catalogs) for archiving purposes. Although Apsis was designed primarily as an automated pipeline, it canAn Automatic Image Reduction Pipeline for the Advanced Camera for Surveys John P. Blakeslee

  18. Transverse wave loading on partially buried marine pipelines

    E-Print Network [OSTI]

    Webb, Richard Edgar

    1988-01-01T23:59:59.000Z

    TRANSVERSE WAVE LOADING ON PARTIALLY BURIED MARINE PIPELINES A Thesis by RICHARD EDGAR WEBB Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December l988 Ma)or Subject: Civil Engineering TRANSVERSE WAVE LOADING ON PARTIALLY BURIED MARINE PIPELINES A Thesis bY RICHARD EDGAR WEBB Approved as to style and content by: Derek V. M ris (Chair of Committee) Calvin E. Woods (Member) Norman R...

  19. EIS-0140: Ocean State Power Project, Tennessee Gas Pipeline Company

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to evaluate potential impacts of construction and operation of a new natural gas-fired, combined-cycle power plant which would be located on a 40.6-acre parcel in the town of Burrillville, Rhode Island, as well as construction of a 10-mile pipeline to transport process and cooling water to the plant from the Blackstone River and a 7.5-mile pipeline to deliver No. 2 fuel oil to the site for emergency use when natural gas may not be available. The Economic Regulatory Administration adopted the EIS on 7/15/1988.

  20. The effect of pipe spacing on marine pipeline scour

    E-Print Network [OSTI]

    Westerhorstmann, Joseph Henry

    1988-01-01T23:59:59.000Z

    . The stability of these subsea pipelines is threatened by loss of bed support resulting from scour. This thesis reviews pipeline scour and presents results of model testing on single and multiple pipes in contact with a sand bed. Few theoretical models exist... and clamp attachment. The maximum recommended cable and circuit resistance is 1. 0 ohm and frequency range in autocompensation mode is 0. 2 to above 10. 0 Hz. Scour profiles were measured with a point gauge profiler. The profiler was manually operated...

  1. Use of geographic information systems for applications on gas pipeline rights-of-way

    SciTech Connect (OSTI)

    Sydelko, P.J.; Wilkey, P.L.

    1992-01-01T23:59:59.000Z

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  2. Use of geographic information systems for applications on gas pipeline rights-of-way

    SciTech Connect (OSTI)

    Sydelko, P.J.

    1993-10-01T23:59:59.000Z

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for land use/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  3. Use of geographic information systems for applications on gas pipeline rights-of-way

    SciTech Connect (OSTI)

    Sydelko, P.J.; Wilkey, P.L.

    1992-12-01T23:59:59.000Z

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  4. EIS-0020: Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California

    Broader source: Energy.gov [DOE]

    The Office of Naval Petroleum and Oil Shale Reserves developed this supplemental statement to evaluate the environmental impacts associated with a modified design of a proposed 250,000 barrels per day crude oil conveyance system from Navel Petroleum Reserve No. 1 to connect to the proposed SOHIO West Coast to Midcontinent Pipeline at Rialto, California. This SEIS is a supplement to DOE/EIS-0020, Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California.

  5. HANFORD SITE LOW EXPOSURE PIPELINE REPAIR USING A NON-METALLIC COMPOSITE SYSTEM

    SciTech Connect (OSTI)

    HUTH RJ

    2009-11-12T23:59:59.000Z

    At the Department of Energy, Richland Operations (DOE-RL) Hanford site in eastern Washington, a 350 mm (14 inch) diameter high density polyethylene (HDPE) pump recirculation pipeline failed at a bonded joint adjacent to a radiologically and chemically contaminated groundwater storage basin. The responsible DOE-RL contractor, CH2MHill Plateau Remediation Company, applied a fiberglass reinforced plastic (composite) field repair system to the failed joint. The system was devised specifically for the HDPE pipe repair at the Hanford site, and had not been used on this type of plastic piping previously. This paper introduces the pipe failure scenario, describes the options considered for repair and discusses the ultimate resolution of the problem. The failed pipeline was successfully returned to service with minimal impact on waste water treatment plant operating capacity. Additionally, radiological and chemical exposures to facility personnel were maintained as low as reasonably achievable (ALARA). The repair is considered a success for the near term, and future monitoring will prove whether the repair can be considered for long term service and as a viable alternative for similar piping failures at the Hanford site.

  6. Recent hydrocarbon developments in Latin America: Key issues in the downstream oil sector

    SciTech Connect (OSTI)

    Wu, K.; Pezeshki, S.

    1995-03-01T23:59:59.000Z

    This report discusses the following: (1) An overview of major issues in the downstream oil sector, including oil demand and product export availability, the changing product consumption pattern, and refineries being due for major investment; (2) Recent upstream developments in the oil and gas sector in Argentina, Bolivia, Brazil, Chile, Colombia, Ecuador, Mexico, Peru, Trinidad and Tobago, and Venezuela; (3) Recent downstream developments in the oil and gas sector in Argentina, Chile, Colombia, Ecuador, Mexico, Peru, Cuba, and Venezuela; (4) Pipelines in Argentina, Bolivia, Brazil, Chile, and Mexico; and (5) Regional energy balance. 4 figs., 5 tabs.

  7. BURNING PLASMA NEXT STEPS: DISCUSSION OF KEY DEVELOPMENTS

    E-Print Network [OSTI]

    , and boundary physics in the regime of dominant self-heating. ­ TECHNOLOGY ¡ 2. Plasma support technologies (heating, fuel delivery, exhaust, plasma- facing components, and magnets) will benefit most because technologies (remote handling, vacuum vessel, blankets, safety and materials) will advance as a result

  8. FE Leaders Discuss African Energy Development | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of Year 2010SaltInstrumentation andFE DOCKET NO. 11-59-LNG FE

  9. FE Leaders Discuss African Energy Development | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy Chinaof EnergyImpactOn Chapter 42.15Mechanical14, 2011 CX-006821:8,AugustFE's

  10. America's "Circulatory System" The 2.3 million miles of pipelines in the United States carry materials and data vital to our

    E-Print Network [OSTI]

    Neimark, Alexander V.

    be able to meet ever-increasing demands for the volumes of natural gas, oil, water, chemicals, electricity and Natural Gas Engineering West Virginia University (WVU) Colleen Richwall, P.E., Chair New Jersey Common CAIT's Pipeline Safety and Security Program (PSSP) aims to play a major role in developing technologies

  11. Don't break the pipeline: Ensuring a workforce for the burning plasma era G.M. Olynyk, Z.S. Hartwig, and R.T. Mumgaard

    E-Print Network [OSTI]

    Don't break the pipeline: Ensuring a workforce for the burning plasma era G.M. Olynyk, Z.S. Hartwig plant ("Pilot"), the next- step fusion energy device will be designed, built, and op- erated the crucial distinction between facility construction and workforce development. Unlike building facilities

  12. A contingency plan helps companies prepare for oilfield, pipeline spills

    SciTech Connect (OSTI)

    Duey, R.

    1996-02-01T23:59:59.000Z

    There are many hazards associated with oilfield, pipeline spills such as fires, litigation, fines, etc. Operators and companies need to have a plan in place and make sure their employees know what to do when disaster strikes. This paper describes emergency preparedness plans.

  13. Pipelined Implementation of the Hough Transform in a Pyramid Multiprocessor

    E-Print Network [OSTI]

    Atiquzzaman, Mohammed

    of the transform is its requirement for a large amount of computing power. The computational requirement. 1 Introduction The Hough transform [1] is a powerful technique to detect patterns in imagesPipelined Implementation of the Hough Transform in a Pyramid Multiprocessor M. Atiquzzaman Dept

  14. Planned oil pipeline vital to economy of Kazakhstan

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The West Kazakhstan-Kumkol pipeline project is extremely vital to the economy of the Republic of Kazakhstan`s ultimate goal of transporting crude oil produced from the western part of the country eastward to Kumkol, from where it is further transported through existing pipelines to refineries in Chimkent in the south and Pavoldar in the northeast. The two refineries are now mainly supplied with west Siberian crudes imported through a pipeline that approaches Kazakhstan via Omsk. The planned pipeline will allow increased use of local crudes, thereby considerably improving a secure supply for the consumers while also increasing the flexibility of the nation`s overall import/export situation. The importance of this project is stressed by the Kazakh government which has officially classified it as a national priority project. The technical feasibility study of the project was prepared by ILF Consulting Engineers of Germany and Price Waterhouse Financial Consultants is conducting a study to determine the economical viability of the project. The overall cost is estimated at $1.1 billion, with the cost of Phase 1 placed at $600 million.

  15. Gas supplies of interstate/natural gas pipeline companies 1989

    SciTech Connect (OSTI)

    Not Available

    1990-12-18T23:59:59.000Z

    This publication provides information on the interstate pipeline companies' supply of natural gas during calendar year 1989, for use by the FERC for regulatory purposes. It also provides information to other Government agencies, the natural gas industry, as well as policy makers, analysts, and consumers interested in current levels of interstate supplies of natural gas and trends over recent years. 5 figs., 18 tabs.

  16. MODELING AND VERIFICATION OF A PIPELINED CPU Lubomir Ivanov

    E-Print Network [OSTI]

    Ivanov, Lubomir

    of complex hardware and software systems. Several powerful verification methods, such as Symbolic ModelMODELING AND VERIFICATION OF A PIPELINED CPU Lubomir Ivanov Department of Computer Science, Iona interleavings of events in a system. In [8] we introduced a new partial order verification method, referred

  17. The RNA-Seq Analysis pipeline on Galaxy

    SciTech Connect (OSTI)

    Meng, Xiandong; Martin, Jeffrey; Wang, Zhong

    2011-05-31T23:59:59.000Z

    Q: How do I know my RNA-Seq experiments worked well A: RNA-Seq QC PipelineQ: How do I detect transcripts which are over expressed or under expressed in my samples A: Counting and Statistic AnalysisQ: What do I do if I don't have a reference genome A: Rnnotator de novo Assembly.

  18. Data Management & Characterization: Pipeline Approaches to Calibration/Reduction

    E-Print Network [OSTI]

    Ellingson, Steven W.

    /23/2001 LWA Data Management 1 #12;The LWA & the VLSS ˇ VLSS 74 MHz all sky survey will deliver initialData Management & Characterization: Pipeline Approaches to Calibration/Reduction Namir Kassim NRL 5 ­ emerging ionospheric weather diagnostics 5/23/2001 LWA Data Management 2 #12;VLSS: Good science, Good

  19. Natural Gas Pipeline Research: Best Practices in Monitoring Technology

    E-Print Network [OSTI]

    Natural Gas Pipeline Research: Best Practices in Monitoring Technology Energy Systems Research/index.html January 2012 The Issue California is the secondlargest natural gas consuming state in the United States, just behind Texas. About 85% of the natural gas consumed in California is delivered on interstate

  20. Optimal Design of Synchronous Circuits Using Software Pipelining Techniques

    E-Print Network [OSTI]

    Boyer, Michel

    Computer Society Press, Los Alamitos, Calif., pp. 62-67. Author's addresses: F. R. Boyer, E. M. AboulhamidOptimal Design of Synchronous Circuits Using Software Pipelining Techniques FRANC¸OIS R. BOYER´eal and MICHEL BOYER Universit´e de Montr´eal We present a method to optimize clocked circuits by relocating

  1. ReCycle: Pipeline Adaptation to Tolerate Process Variation

    E-Print Network [OSTI]

    Torrellas, Josep

    ReCycle: Pipeline Adaptation to Tolerate Process Variation Abhishek Tiwari, Smruti R. Sarangi, Josep Torrellasg 1 #12;OutlineOutline ˇ MotivationMotivation ˇ ReCycle Idea U i R C lˇ Using ReCycle ˇ ReCycle System overview ˇ Results 2 #12;MotivationMotivation V i ti k t l thˇ Variation makes some

  2. Assistant Secretary Hoffman Discusses Grid Modernization with...

    Broader source: Energy.gov (indexed) [DOE]

    Assistant Secretary Hoffman Discusses Grid Modernization with the New York Times and E&E TV Assistant Secretary Hoffman Discusses Grid Modernization with the New York Times and E&E...

  3. Budget Discussion OHEP May 12, 2008

    E-Print Network [OSTI]

    Wechsler, Risa H.

    Budget Discussion OHEP May 12, 2008 Page 1 SLAC PPA Budget Discussion: FY09 Allocations Among BNR Directorate #12;Budget Discussion OHEP May 12, 2008 Page 2 Purpose of This Meeting * In February, we presented our budget plans for FY09 and beyond, guided by the future scientific program that we laid out

  4. FEASIBILITY STUDY OF PRESSURE PULSING PIPELINE UNPLUGGING TECHNOLOGIES FOR HANFORD

    SciTech Connect (OSTI)

    Servin, M. A. [Washington River Protection Solutions, LLC, Richland, WA (United States); Garfield, J. S. [AEM Consulting, LLC (United States); Golcar, G. R. [AEM Consulting, LLC (United States)

    2012-12-20T23:59:59.000Z

    The ability to unplug key waste transfer routes is generally essential for successful tank farms operations. All transfer lines run the risk of plugging but the cross site transfer line poses increased risk due to its longer length. The loss of a transfer route needed to support the waste feed delivery mission impacts the cost and schedule of the Hanford clean up mission. This report addresses the engineering feasibility for two pressure pulse technologies, which are similar in concept, for pipeline unplugging.

  5. QER- Comment of Plains All American Pipeline, L.P.

    Broader source: Energy.gov [DOE]

    To: Members of the Quadrennial Energy Review Task Force Secretariat and Energy Policy and Systems Analysis Staff, U.S. Department of Energy Enclosed please find comments submitted on behalf of Plains All American Pipeline, L.P. for the record of the QER’s August 21, 2014 Infrastructure Siting and Permitting Meeting in Cheyenne, WY. Feel free to contact me if you need anything further regarding this communication.

  6. Canada's Arctic Gateway: Discussion Paper Summary

    E-Print Network [OSTI]

    Martin, Jeff

    Canada's Arctic Gateway: Discussion Paper Summary September 2010 The following summarizes key Canada's Arctic Gateway a reality in terms of both national public policy and international presence the Government of Canada's national gateway policy framework. This discussion paper's use of the term "Arctic

  7. Systems analysis of hydrogen supplementation in natural gas pipelines

    SciTech Connect (OSTI)

    Hermelee, A.; Beller, M.; D'Acierno, J.

    1981-11-01T23:59:59.000Z

    The potential for hydrogen supplementation in natural gas pipelines is analyzed for a specific site from both mid-term (1985) and long-term perspectives. The concept of supplementing natural gas with the addition of hydrogen in the existing gas pipeline system serves to provide a transport and storage medium for hydrogen while eliminating the high investment costs associated with constructing separate hydrogen pipelines. This paper examines incentives and barriers to the implementation of this concept. The analysis is performed with the assumption that current developmental programs will achieve a process for cost-effectively separating pure hydrogen from natural gas/hydrogen mixtures to produce a separable and versatile chemical and fuel commodity. The energy systems formulation used to evaluate the role of hydrogen in the energy infrastructure is the Reference Energy System (RES). The RES is a network diagram that provides an analytic framework for incorporating all resources, technologies, and uses of energy in a uniform manner. A major aspect of the study is to perform a market analysis of traditional uses of resources in the various consuming sectors and the potential for hydrogen substitution in these sectors. The market analysis will focus on areas of industry where hydrogen is used as a feedstock rather than for its fuel-use opportunities to replace oil and natural gas. The sectors of industry where hydrogen is currently used and where its use can be expanded or substituted for other resources include petroleum refining, chemicals, iron and steel, and other minor uses.

  8. Renewable resource development in the Ecuadorian rainforest

    SciTech Connect (OSTI)

    Hutton, W.C.; Skaggs, M.M. Jr.

    1995-12-31T23:59:59.000Z

    This paper discusses the planning and execution of a multi-million dollar, heavy oil renewable resource development project in the Amazon Basin of Ecuador. The project work is authorized under a risk service contract with PETROECUADOR and employs new technology in order to minimize environmental and cultural impacts on the environment and the inhabitants of the areas. During the peak of the project, over 3,000 workers were employed and managed in the rainforest under special guidelines, in order to avoid damages to the environment. The project guidelines are spelled out in a model Environmental Management Plan (EMP) which employs innovative well pad, road and pipeline construction and platform drilling methods to limit deforestation. Reforestation methods are reviewed; scientific baseline and archaeological pre and post construction methods were followed, and methods to control colonization pressures are executed as a part of the EMP described in this paper. In addition, the EMP covers methods used to minimize the disruption of the indigenous population of the area including medical, educational and other programs employed to reduce disease among the indigenous population of the area. Conventional aspects of the EMP include spill control techniques for remote areas of the rainforest, solid waste recycling programs, drilling and construction waste management, landfarming methods, pipeline construction and underground river crossing methods. All of these methods are employed to minimize the environmental and cultural impact of the project on the environment and its inhabitants.

  9. Pipeline system insulation: Thermal insulation and corrosion prevention. (Latest citations from the Rubber and Plastics Research Association database). Published Search

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    The bibliography contains citations concerning thermal and corrosion insulation of pipeline systems used to transport liquids and gases. Topics include thermal aging of polyurethane used for foam heating pipes, extrusion film pipeline insulation materials and processes, flexible expanded nitrile rubber pipeline insulation with Class 1 fire rating, and underground fiberglass reinforced polyester insulated pipeline systems. Applications in solar heating systems; underground water, oil, and gas pipelines; interior hot and cold water lines under seawater; and chemical plant pipeline system insulation are included. (Contains 250 citations and includes a subject term index and title list.)

  10. Bibliography on northern pipelines in the former Soviet Union. Special report

    SciTech Connect (OSTI)

    Smallidge, E.R.

    1997-08-01T23:59:59.000Z

    In 1993 a pilot project between the Defense Technical Information Center and the U.S. Army Cold Regions Research and Engineering Laboratory resulted in a proposal to conduct a state-of-the-art review of technology and techniques for building, operating, and maintaining arctic natural gas and liquid petroleum pipelines in the former Soviet Union. The objectives of the pipeline review were to (1) Review the design, construction, operation, and maintenance procedures of oil and gas pipelines in the permafrost areas of eastern and western Siberia. (2) Assemble data on the evolution of Siberian pipelines, reflecting changes in size, modes of construction, and age. (3) Assemble data on maintenance procedures and practices, including inspection techniques with respect to corrosion, pipe wrinkling, and metal fatigue. (4) Assemble data on pipeline failures and attempt to predict life expectancy of different pipelines under the harsh arctic environment. (5) Evaluate the environmental impact of different pipeline construction techniques and relate it to ruptures and breaks. In conjunction with the study objectives, a literature search was conducted on northern pipelines in the former Soviet Union. References were compiled on dates of construction, location, route conditions, design, construction, maintenance, environmental impact, accidents, production management, and other pertinent facts. In the resulting bibliography, references are separated into three categories: Oil and Gas Pipelines, Construction, and Accidents. There is some repetition of references between the categories because some are relevant to more than one of the subject categories.

  11. ,"Port of Del Bonita, MT Natural Gas Pipeline Imports From Canada...

    U.S. Energy Information Administration (EIA) Indexed Site

    Del Bonita, MT Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest...

  12. 1 | Forestry, sustainable behaviours and behaviour change: Discussion paper |2012| Discussion Paper: Behaviour Change

    E-Print Network [OSTI]

    1 | Forestry, sustainable behaviours and behaviour change: Discussion paper |2012| Discussion Paper: Behaviour Change Forestry, sustainable behaviours and behaviour change ­ a discussion paper1 Introduction This discussion paper explores what the current focus on behaviour means for the forestry sector, using evidence

  13. INVESTIGATION OF PIPELINES INTEGRITY ASSOCIATED WITH PUMP MODULES VIBRATION FOR PUMPING STATION 9 OF ALYESKA PIPELINE SERVICE COMPANY

    SciTech Connect (OSTI)

    Wang, Jy-An John [ORNL

    2009-09-01T23:59:59.000Z

    Since the operation of PS09 SR module in 2007, it has been observed that there is vibration in various parts of the structures, on various segments of piping, and on appurtenance items. At DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) request, ORNL Subject Matter Experts support PHMSA in its review and analysis of the observed vibration phenomenon. The review and analysis consider possible effects of pipeline design features, vibration characteristics, machinery configuration, and operating practices on the structural capacity and leak tight integrity of the pipeline. Emphasis is placed on protection of welded joints and machinery against failure from cyclic loading. A series of vibration measurements were carried out by the author during the site visit to PS09, the power of the operating pump during the data collection is at about 2970KW, which is less than that of APSC's vibration data collected at 3900KW. Thus, a first order proportional factor of 4900/2970 was used to project the measured velocity data to that of APSC's measurement of the velocity data. It is also noted here that the average or the peak-hold value of the measured velocity data was used in the author's reported data, and only the maximum peak-hold data was used in APSC's reported data. Therefore, in some cases APSC's data is higher than the author's projective estimates that using the average data. In general the projected velocity data are consistent with APSC's measurements; the examples of comparison at various locations are illustrated in the Table 1. This exercise validates and confirms the report vibration data stated in APSC's summary report. After the reinforcement project for PS09 Station, a significant reduction of vibration intensity was observed for the associated pipelines at the SR Modules. EDI Co. provided a detailed vibration intensity investigation for the newly reinforced Pump Module structures and the associated pipelines. A follow-up review of EDI's report was carried out by the author. The comments and questions regarding the EDI report are categorized into four subjects, namely (1) piping vibration severity, (2) pulsation and its impact on the PS09 structure and piping, (3) strain-gage stress history profiles, and (4) the cavitation potential investigation, where the questions are stated at the end of the comments for further follow-on investigations.

  14. EIA - Natural Gas Pipeline System - Central Region

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877 951,322DevelopmentConfiguration Salt

  15. EIA - Natural Gas Pipeline System - Midwest Region

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877 951,322DevelopmentConfigurationMidwest Region

  16. EIA - Natural Gas Pipeline System - Northeast Region

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688 760,877 951,322DevelopmentConfigurationMidwest

  17. "TOF2H": A precision toolbox for rapid, high density/high coverage hydrogen-deuterium exchange mass spectrometry via an LC-MALDI approach, covering the data pipeline from spectral acquisition to HDX rate analysis

    E-Print Network [OSTI]

    Nikamanon, Pornpat; Pun, Elroy; Chou, Wayne; Koter, Marek D; Gershon, Paul D

    2008-01-01T23:59:59.000Z

    covering the data pipeline from spectral acquisition to HDXAn integrated data pipeline (Solvent Explorer/TOF2H) has

  18. A simulation pipeline for the Planck mission

    E-Print Network [OSTI]

    Martin Reinecke; Klaus Dolag; Reinhard Hell; Matthias Bartelmann; Torsten Ensslin

    2005-08-24T23:59:59.000Z

    We describe an assembly of numerical tools to model the output data of the Planck satellite. These start with the generation of a CMB sky in a chosen cosmology, add in various foreground sources, convolve the sky signal with arbitrary, even non-symmetric and polarised beam patterns, derive the time ordered data streams measured by the detectors depending on the chosen satellite-scanning strategy, and include noise signals for the individual detectors and electronic systems. The simulation products are needed to develop, verify, optimise, and characterise the accuracy and performance of all data processing and scientific analysis steps of the Planck mission, including data handling, data integrity checking, calibration, map making, physical component separation, and power spectrum estimation. In addition, the simulations allow detailed studies of the impact of many stochastic and systematic effects on the scientific results. The efficient implementation of the simulation allows the build-up of extended statistics of signal variances and co-variances. Although being developed specifically for the Planck mission, it is expected that the employed framework as well as most of the simulation tools will be of use for other experiments and CMB-related science in general.

  19. Conference Discussion of the Nuclear Force

    SciTech Connect (OSTI)

    Franz Gross,Thomas D. Cohen,Evgeny Epelbaum,R. Machleidt

    2010-12-01T23:59:59.000Z

    Discussion of the nuclear force, lead by a round table consisting of T. Cohen, E. Epelbaum, R. Machleidt, and F. Gross (chair). After an invited talk by Machleidt, published elsewhere in these proceedings, brief remarks are made by Epelbaum, Cohen, and Gross, followed by discussion from the floor moderated by the chair. The chair asked the round table and the participants to focus on the following issues: (1)What does each approach (chiral effective field theory, large Nc, and relativistic phenomenology) contribute to our knowledge of the nuclear force? Do we need them all? Is any one transcendent? (2) How important for applications (few body, nuclear structure, EMC effect, for example) are precise fits to the NN data below 350 MeV? How precise do these fits have to be? (3) Can we learn anything about nonperturbative QCD from these studies of the nuclear force? The discussion presented here is based on a video recording made at the conference and transcribed afterward.

  20. From upstream to downstream: Megatrends and latest developments in Latin America`s hydrocarbons sector

    SciTech Connect (OSTI)

    Wu, Kang; Pezeshki, S.; McMahon, J.

    1995-08-01T23:59:59.000Z

    In recent years, Latin America`s hydrocarbons sector has been characterized by reorganization, revitalization, regional cooperation, environmental awakening, and steady expansion. The pattern of these changes, which appear to be the megatrends of the region`s hydrocarbons sector development, will continue during the rest of the 1990s. To further study the current situation and future prospects of Latin America`s hydrocarbons sector, we critically summarize in this short article the key issues in the region`s oil and gas development. These megatrends in Latin America`s hydrocarbons sector development will impact not only the future energy demand and supply in the region, but also global oil flows in the North American market and across the Pacific Ocean. Each country is individually discussed; pipelines to be constructed are discussed also.

  1. Matilda: A Distributed UML Virtual Machine for Model-Driven Software Development

    E-Print Network [OSTI]

    Suzuki, Jun

    is designed as a pipeline (or sequence) of plugins. Different plugins implement different functionalities in Matilda, such as importing UML models, validating UML models and construct- ing a JAST. The pipeline, called Matilda, which allows developers to design their applications as UML models and directly execute

  2. Disinfection Procedure for Water Distribution Pipelines Drinking water contamination can be prevented by hydrostatic testing and disinfection of

    E-Print Network [OSTI]

    de Lijser, Peter

    Disinfection Procedure for Water Distribution Pipelines Drinking water contamination can be prevented by hydrostatic testing and disinfection of potable water distribution pipelines before connecting-921 3. Assess residual chlorine concentrations 4. Confirm that residual chlorine concentrations do

  3. Towards the Development of a Web-based Alignment Platform 

    E-Print Network [OSTI]

    Schnober, Carsten

    2010-01-01T23:59:59.000Z

    In this work, a platform is developed that makes existing sentence and word alignment tools available as web services. The tools implemented are Hunalign and GIZA++; after creating wrappers and format converters, they are embedded into a pipeline...

  4. Consulting Assistance on Economic Discussion Papers

    E-Print Network [OSTI]

    Consulting Assistance on Economic Reform II Discussion Papers The objectives of the Consulting Assistance on Economic Reform (CAER II) project are to contribute to broad-based and sustainable economic, Bureau for Global Programs, Field Support and Research, Center for Economic Growth and Agricultural

  5. Earth: The Early Years We discuss ...

    E-Print Network [OSTI]

    Earth: The Early Years We discuss ... ˇ What happened to the Earth during the first few billion)? ˇ What is the relationship to (early) life? #12;Age of Earth James Ussher (17th C) biblical account: 6: 20-40 m.y. (million years!) Charles Darwin evolution >300 m.y. Lord Kelvin (1880's) cooling Earth: 50

  6. Discussion Papers in Economics Department of Economics

    E-Print Network [OSTI]

    Doran, Simon J.

    Discussion Papers in Economics Department of Economics University of Surrey Guildford Surrey GU2 7 participants at Aberdeen, Essex, LSE, UCL, the Paris School of Economics and from participants in the 2007 Royal Economic Society annual conference held in Warwick, the 2007 American Law and Economics

  7. --Discussion Paper--ORGANIC AND CONVENTIONAL POTATOES

    E-Print Network [OSTI]

    Radeloff, Volker C.

    1 --Discussion Paper-- ORGANIC AND CONVENTIONAL POTATOES: PRICING AND DEMAND, 2000-2005 I. ORGANICS). Among fresh vegetables, the top organic purchases are lettuce, tomatoes, broccoli, onions, and potatoes. Among selected vegetables, a recent US study found the largest organic premium was for potatoes (Zhang

  8. SCADA computer sytem controls major Saudi Aramco crude oil pipeline

    SciTech Connect (OSTI)

    Dempsey, J.; Al-Habib, R. [Saudi Aramco, Dhahran (Saudi Arabia)

    1996-12-31T23:59:59.000Z

    A replacement Supervisory Control and Data Acquisition (SCADA) computer system which monitors and controls two 1,100 kilometer pipelines and eleven associated pump stations is described. The SCADA system was designed to meet two objectives: (1) decentralize the overall control system and provide a distributed control system capable of regulatory control at each pump and pressure reducing station, and (2) provide system wide monitoring and supervisory control function during normal operations at the crude oil terminal. The SCADA computer system hardware (host computers and consoles), software modules, and applications are overviewed. A data flow diagram and a hardware configuration diagram are provided. 3 figs.

  9. Structural Genomics of Minimal Organisms: Pipeline and Results

    SciTech Connect (OSTI)

    Kim, Sung-Hou; Shin, Dong-Hae; Kim, Rosalind; Adams, Paul; Chandonia, John-Marc

    2007-09-14T23:59:59.000Z

    The initial objective of the Berkeley Structural Genomics Center was to obtain a near complete three-dimensional (3D) structural information of all soluble proteins of two minimal organisms, closely related pathogens Mycoplasma genitalium and M. pneumoniae. The former has fewer than 500 genes and the latter has fewer than 700 genes. A semiautomated structural genomics pipeline was set up from target selection, cloning, expression, purification, and ultimately structural determination. At the time of this writing, structural information of more than 93percent of all soluble proteins of M. genitalium is avail able. This chapter summarizes the approaches taken by the authors' center.

  10. Dynamic response of a buried pipeline at low frequencies

    SciTech Connect (OSTI)

    O'Leary, P.M.; Datta, S.K.

    1985-02-01T23:59:59.000Z

    A long wavelength and low-frequency analysis is presented here for the dynamic behavior of a long continuous pipeline embedded in an elastic medium. Using a shell model for the pipe, it is shown that the dynamic amplification of axial and hoop stresses induced in the pipe due to traveling plane waves (longitudinal and shear) depends crucially on the ratio of the rigidities of the surrounding soil and the pipe. Results are presented showing the dependence of the induced stresses on the direction of propagation of the incident waves, the Poisson's ratios and rigidities of the ground and pipe materials.

  11. A perspective on pipeline pricing under the Natural Gas Act

    SciTech Connect (OSTI)

    Threadgill, E.E.

    1995-12-31T23:59:59.000Z

    Pricing different services to a single class of customers, and pricing different services to the same or different classes of customers, are complex matters which, in many instances, are case specific. Cost responsibilities, market demands, and national policies should be taken into account in pricing pipeline services. But one fact is eminently clear, and that is that radically different {open_quotes}FERC incremental{close_quotes} rates for the same service to the same class of customers, depending upon the date upon which the customers signed contracts for an expansion of service, are unduly discriminatory and illegal under the NGA.

  12. EIA - Natural Gas Pipeline Network - Region To Region System Capacity

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization & Capacity

  13. EIA - Natural Gas Pipeline Network - Regional Overview and Links

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization &Overview and

  14. EIA - Natural Gas Pipeline Network - States Dependent on Interstate

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline Utilization

  15. EIA - Natural Gas Pipeline Network - Transportation Process & Flow

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline UtilizationProcess and Flow

  16. EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline UtilizationProcess andStorage

  17. EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline UtilizationProcess

  18. EIA - Natural Gas Pipeline Network - Underground Natural Gas Storage

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06)Pipeline UtilizationProcessFacilities

  19. Hawaii Natural Gas Pipeline and Distribution Use (Million Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.GasYearperHOW TO OBTAINCommercialPipeline and

  20. Otay Mesa, CA Natural Gas Imports by Pipeline from Mexico

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial Consumers (NumberThousand Cubic Feet) 0 86 537 1998-2014 Pipeline0 0

  1. Energy-Efficient Multi-Pipeline Architecture for Terabit Packet Classification

    E-Print Network [OSTI]

    Prasanna, Viktor K.

    Energy-Efficient Multi-Pipeline Architecture for Terabit Packet Classification Weirong Jiang-pipeline architecture for energy-efficient packet classification. We optimize the HyperCuts algorithm, which Angeles, CA 90089, USA Email: {weirongj, prasanna}@usc.edu Abstract--Energy efficiency has become

  2. A high performance zero-crossing based pipelined analog-to-digital converter

    E-Print Network [OSTI]

    Chu, Yue Jack

    2008-01-01T23:59:59.000Z

    In this thesis, I describe a zero-crossing based pipelined ADC. Unlike traditional pipelined ADCs, this work does not use any op-amps in the signal path. The use of zero-crossing based circuits made it possible to achieve ...

  3. Leakage Evaluated and Controlled from Industrial Process Pipeline by Optimum Gasket Assembly Stress

    E-Print Network [OSTI]

    Chen, Shu-Ching

    will ultimately result in a complete proposal to prevent any hazardous gas leaks in the process industries0 Leakage Evaluated and Controlled from Industrial Process Pipeline by Optimum Gasket Assembly and vehicles), but they have ignore the leakage between pipelines in process industries. When hazardous

  4. Sense and Sidedness in the Graphics Pipeline via a Passage through a Separable Space

    E-Print Network [OSTI]

    Toronto, University of

    Sense and Sidedness in the Graphics Pipeline via a Passage through a Separable Space Sherif Ghali Abstract Computer graphics is ostensibly based on projective geometry. The graphics pipeline--the sequence of functions applied to 3D geometric primitives to determine a 2D image--is described in the graphics

  5. Pipeline Strategy for Improving Optimal Energy Efficiency in Ultra-Low Voltage Design

    E-Print Network [OSTI]

    Kambhampati, Subbarao

    Pipeline Strategy for Improving Optimal Energy Efficiency in Ultra-Low Voltage Design Mingoo Seok for the ultra low voltage regime. Based on an analytical model and simulations, we propose a pipelining technique that provides higher energy effi- ciency and performance than conventional approaches to ultra low

  6. Pipeline corridors through wetlands -- Impacts on plant communities: Norris Brook Crossing Peabody, Massachusetts

    SciTech Connect (OSTI)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01T23:59:59.000Z

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted August 17--19, 1992, at the Norris Brook crossing in the town of Peabody, Essex County, Massachusetts. The pipeline at this site was installed during September and October 1990. A backhoe was used to install the pipeline. The pipe was assembled on the adjacent upland and slid into the trench, after which the backhoe was used again to fill the trench and cover the pipeline. Within two years after pipeline construction, a dense vegetative community, composed predominantly of native perennial species, had become established on the ROW. Compared with adjacent natural areas undisturbed by pipeline installation, there was an increase in purple loosestrife and cattail within the ROW, while large woody species were excluded from the ROW. As a result of the ROW`s presence, habitat diversity, edge-type habitat, and species diversity increased within the site. Crooked-stem aster, Aster prenanthoides (a species on the Massasschusetts list of plants of special concern), occurred in low numbers in the adjacent natural areas and had reinvaded the ROW in low numbers.

  7. Energy-Efficient Pipeline Templates for High-Performance Asynchronous Circuits

    E-Print Network [OSTI]

    Manohar, Rajit

    A Energy-Efficient Pipeline Templates for High-Performance Asynchronous Circuits Basit Riaz Sheikh and Rajit Manohar, Cornell University We present two novel energy-efficient pipeline templates for high is presented, which results in significant latency and energy savings especially as the number of outputs

  8. Water Loss Test Results for the West Main Pipeline United Irrigation District of Hidalgo County 

    E-Print Network [OSTI]

    Leigh, E.; Fipps, G.

    2008-01-01T23:59:59.000Z

    TR-322 2008 Water Loss Test Results for the West Main Pipeline United Irrigation District of Hidalgo County Eric Leigh Texas AgriLife Extension Associate, Biological and Agricultural Engineering, College... Station Guy Fipps Texas AgriLife Extension Professor and Extension Agricultural Engineer, Biological and Agricultural Engineering, College Station March 20, 2007 Water Loss Test Results for the West Main Pipeline United Irrigation...

  9. Water Loss Test Results for the West Main Pipeline United Irrigation District of Hidalgo County

    E-Print Network [OSTI]

    Leigh, E.; Fipps, G.

    TR-322 2008 Water Loss Test Results for the West Main Pipeline United Irrigation District of Hidalgo County Eric Leigh Texas AgriLife Extension Associate, Biological and Agricultural Engineering, College... Station Guy Fipps Texas AgriLife Extension Professor and Extension Agricultural Engineer, Biological and Agricultural Engineering, College Station March 20, 2007 Water Loss Test Results for the West Main Pipeline United Irrigation...

  10. Hydrogen Pipeline Material Testing We provide critical data, measurement methods and models that enable safe

    E-Print Network [OSTI]

    fatigue data for pipeline materials including steel alloys currently being used (API X52), those proposed helping to inform and revise relevant codes and standards. Impact and Customers While pipelines are the safest, most economical way to transport fuels, the pa- rameters used for codes and standards

  11. A yeast one-hybrid and microfluidics-based pipeline to map mammalian gene regulatory networks

    E-Print Network [OSTI]

    Diggavi, Suhas

    A yeast one-hybrid and microfluidics-based pipeline to map mammalian gene regulatory networks that this cross-platform pipeline characterizes known and uncovers many novel TF­DNA interactions. In addition, we an excellent model organism for studying metazoan gene regulation, especially mamma- lian-specific complex

  12. SOFTWARE Open Access Promzea: a pipeline for discovery of co-regulatory

    E-Print Network [OSTI]

    Raizada, Manish N.

    SOFTWARE Open Access Promzea: a pipeline for discovery of co-regulatory motifs in maize and other and cis-acting DNA motifs underlying their regulation is a major objective of transcriptome studies motif prediction. These principles were integrated into a user-friendly pipeline for motif discovery

  13. SAFETY OF HYDROGEN/NATURAL GAS MIXTURES BY PIPELINES: ANR FRENCH PROJECT HYDROMEL

    E-Print Network [OSTI]

    Boyer, Edmond

    1 SAFETY OF HYDROGEN/NATURAL GAS MIXTURES BY PIPELINES: ANR FRENCH PROJECT HYDROMEL Hébrard, J.1 linked with Hydrogen/Natural gas mixtures transport by pipeline, the National Institute of Industrial scenario, i.e. how the addition of a quantity of hydrogen in natural gas can increase the potential

  14. Gas Balancing Rules Must Take into account the Trade-off between Offering Pipeline Transport and Pipeline Flexibility in Liberalized Gas Markets

    E-Print Network [OSTI]

    Keyaerts, Nico

    This paper analyses the value and cost of line-pack flexibility in liberalized gas markets through the examination of the techno-economic characteristics of gas transport pipelines and the trade-offs between the different ...

  15. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2002-01-01T23:59:59.000Z

    ). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

  16. Managements Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy and new technologies. The agency funds regional efforts to protect and enhance fish and wildlife populations affected by federal hydropower development and operations in...

  17. Managements Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy and new technologies. The agency funds regional efforts to protect and enhance fish and wildlife populations affected by federal hydropower development in the Columbia...

  18. Managements Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy and new technologies. The agency funds regional efforts to protect and enhance fish & wildlife populations affected by federal hydropower development and operations in the...

  19. Managements Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy and new technologies. The agency funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River...

  20. Managements Discussion and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy and new technologies. The agency funds regional efforts to protect and rebuild fish and wildlife populations affected by hydropower development in the Columbia River...

  1. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-205 November 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 – 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal M. Edward Rister... Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-205 November 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg...

  2. Control of Major-Accident Hazards Involving Land Transmission Charlotte BOUISSOU, Project Manager for Pipelines Risk Assessment

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    aims to help authorities to balance the requirement of the new pipeline regulation with regardsControl of Major-Accident Hazards Involving Land Transmission Pipelines Charlotte BOUISSOU, Project Manager for Pipelines Risk Assessment Sandrine DESCOURRIERE, Project Manager for Plants Risk Assessment

  3. Analysis of Frequency, Magnitude and Consequence of Worst-Case Spills From the Proposed Keystone XL Pipeline

    E-Print Network [OSTI]

    Farritor, Shane

    approval to build the Keystone XL pipeline from Alber- ta, Canada to Texas. The pipeline will transport to a worst-case discharge and any smaller spills. The Keystone XL environmental assessment documents (e that the environmental assessment docu- ments for the Keystone XL pipeline are inadequate, and that they do not properly

  4. Application of a transient heat transfer model for bundled, multiphase pipelines

    SciTech Connect (OSTI)

    Brown, T.S.; Clapham, J.; Danielson, T.J.; Harris, R.G.; Erickson, D.D.

    1996-12-31T23:59:59.000Z

    A computer model has been developed which accurately describes transient heat transfer in pipeline bundles. An arbitrary number of internal pipelines containing different fluids, flowing in either direction along with the input of heat to one or more of the fluids can be accommodated. The model is coupled to the transient, multiphase flow simulator OLGA. The lines containing the multiphase production fluids are modeled by OLGA, and the heat transfer between the internal lines, carrier pipe, and surroundings is handled by the bundle model. The model has been applied extensively to the design of a subsea, heated bundle system for the Britannia gas condensate field in the North Sea. The 15-km bundle system contains a 14{double_prime} production line, an 8{double_prime} test line, a 3{double_prime} methanol line, and a 12{double_prime} internal heating medium line within a 37.25{double_prime} carrier. The heating medium (water) flows in the internal heating medium line and in the annulus at 82,500 BPD. The primary purpose of the bundle system is to avoid the formation of hydrates. A secondary purpose is to avoid the deposition of paraffin. The bundle model was used to (1) compare the merits of two coaxial lines vs. a single bundle; (2) optimize the insulation levels on the carrier and internal lines; (3) determine the minimum time required to heat up the bundle; (4) determine heat input requirements to avoid hydrates throughout the field life, (5) determine temperature profiles along the lines for a range of production rates; (6) study ruptures of the production line into the bundle annulus; (7) determine minimum temperatures during depressurization; and (8) determine cool-down times. The results of these studies were used to size lines, select insulation levels, assess erosion potential, design for thermal expansion-induced stresses, and to select materials of construction.

  5. Reduced Mandated Inspection by Remote Field Eddy Current Inspection of Unpiggable Pipelines

    SciTech Connect (OSTI)

    Albert Teitsma; Julie Maupin

    2006-09-29T23:59:59.000Z

    The Remote Field Eddy Current (RFEC) technique is ideal for inspecting unpiggable pipelines because all of its components can be made much smaller than the diameter of the pipe to be inspected. For this reason, RFEC was chosen as a technology for unpiggable pipeline inspections by DOE-NETL with the support of OTD and PRCI, to be integrated with platforms selected by DOENETL. As part of the project, the RFEC laboratory facilities were upgraded and data collection was made nearly autonomous. The resulting improved data collection speeds allowed GTI to test more variables to improve the performance of the combined RFEC and platform technologies. Tests were conducted on 6-, 8-, and 12-inch seamless and seam-welded pipes. Testing on the 6-inch pipes included using seven exciter coils, each of different geometry with an initial focus on preparing the technology for use on an autonomous robotic platform with limited battery capacity. Reductions in power consumption proved successful. Tests with metal components similar to the Explorer II modules were performed to check for interference with the electromagnetic fields. The results of these tests indicated RFEC would be able to produce quality inspections while on the robot. Mechanical constraints imposed by the platform, power requirements, control and communication protocols, and potential busses and connectors were addressed. Much work went into sensor module design including the mechanics and electronic diagrams and schematics. GTI participated in two Technology Demonstrations for inspection technologies held at Battelle Laboratories. GTI showed excellent detection and sizing abilities for natural corrosion. Following the demonstration, module building commenced but was stopped when funding reductions did not permit continued development for the selected robotic platform. Conference calls were held between GTI and its sponsors to resolve the issue of how to proceed with reduced funding. The project was rescoped for 10-16-inch pipes with the intent of looking at lower cost, easier to implement, tethered platform applications. OTD ended its sponsorship.

  6. Microstructure and properties of pipeline steel with a ferrite/martensite dual-phase microstructure

    SciTech Connect (OSTI)

    Li Rutao, E-mail: lrt851@126.com; Zuo Xiurong, E-mail: zuoxiurong@126.com; Hu Yueyue, E-mail: hucheng85@126.com; Wang Zhenwei, E-mail: wzw0530@126.com; Hu, Dingxu, E-mail: xiaohu369@163.com

    2011-08-15T23:59:59.000Z

    In order to satisfy the transportation of the crude oil and gas in severe environmental conditions, a ferrite/martensite dual-phase pipeline steel has been developed. After a forming process and double submerged arc welding, the microstructure of the base metal, heat affected zone and weld metal was characterized using scanning electron microscopy and transmission electron microscopy. The pipe showed good deformability and an excellent combination of high strength and toughness, which is suitable for a pipeline subjected to the progressive and abrupt ground movement. The base metal having a ferrite/martensite dual-phase microstructure exhibited excellent mechanical properties in terms of uniform elongation of 7.5%, yield ratio of 0.78, strain hardening exponent of 0.145, an impact energy of 286 J at - 10 deg. C and a shear area of 98% at 0 deg. C in the drop weight tear test. The tensile strength and impact energy of the weld metal didn't significantly reduce, because of the intragranularly nucleated acicular ferrites microstructure, leading to high strength and toughness in weld metal. The heat affected zone contained complete quenching zone and incomplete quenching zone, which exhibited excellent low temperature toughness of 239 J at - 10 deg. C. - Research Highlights: {yields}The pipe with ferrite/martensite microstructure shows high deformability. {yields}The base metal of the pipe consists of ferrite and martensite. {yields}Heat affected zone shows excellent low temperature toughness. {yields}Weld metal mainly consists of intragranularly nucleated acicular ferrites. {yields}Weld metal shows excellent low temperature toughness and high strength.

  7. A 3D Automated Classification Scheme for the TAUVEX data pipeline

    E-Print Network [OSTI]

    Archana Bora; Ranjan Gupta; Harinder P. Singh; Jayant Murthy; Rekhesh Mohan; Kalpana Duorah

    2007-12-28T23:59:59.000Z

    In order to develop a pipeline for automated classification of stars to be observed by the TAUVEX ultraviolet space Telescope, we employ an artificial neural network (ANN) technique for classifying stars by using synthetic spectra in the UV region from 1250\\AA to 3220\\AA as the training set and International Ultraviolet Explorer (IUE) low resolution spectra as the test set. Both the data sets have been pre-processed to mimic the observations of the TAUVEX ultraviolet imager. We have successfully classified 229 stars from the IUE low resolution catalog to within 3-4 spectral sub-class using two different simulated training spectra, the TAUVEX spectra of 286 spectral types and UVBLUE spectra of 277 spectral types. Further, we have also been able to obtain the colour excess (i.e. E(B-V) in magnitude units) or the interstellar reddening for those IUE spectra which have known reddening to an accuracy of better than 0.1 magnitudes. It has been shown that even with the limitation of data from just photometric bands, ANNs have not only classified the stars, but also provided satisfactory estimates for interstellar extinction. The ANN based classification scheme has been successfully tested on the simulated TAUVEX data pipeline. It is expected that the same technique can be employed for data validation in the ultraviolet from the virtual observatories. Finally, the interstellar extinction estimated by applying the ANNs on the TAUVEX data base would provide an extensive extinction map for our galaxy and which could in turn be modeled for the dust distribution in the galaxy.

  8. FLUID TRANSIENTS IN A PIPELINE WITH ONE END OPEN

    SciTech Connect (OSTI)

    Leishear, R

    2008-06-09T23:59:59.000Z

    Water hammer during multi-phase flow is rather complex, but in some cases an upper limit to the pressure surge magnitude during water hammer can be estimated. In the case considered here, a two mile long pipeline with a single high point was permitted to partially drain. Due to gravitational effects, air bubbles up through the pipe line to its highest point, but the time required for air to reach the top of the pipe is rather long. Consequently, some transients caused by valve operations are affected by air entrapment and some are not. The intent of this research was to investigate the complex interactions between air, water vapor, and liquid during water hammer in a long pipe with one end of the pipe open to atmospheric conditions. To understand the system dynamics, experimental data was obtained from a long pipeline with an open end and also from a short, transparent tube. Transient calculations were performed for valve closures and pump operations as applicable. The limitations of available calculation techniques were considered in detail.

  9. Soil corrosion monitoring near a pipeline under CP

    SciTech Connect (OSTI)

    Bullard, Sophie J.; Covino, Bernard S., Jr.; Cramer, Stephen D.; Holcomb, Gordon R.; Ziomek-Moroz, Margaret; Locke, M.L. (NW Natural); Warthen, M.R. (NW Natural); Kane, Russell D. (Intercorr International Inc.); Eden, Dawn C. (Intercorr International Inc.)

    2005-01-01T23:59:59.000Z

    Electrochemical noise (EN), linear polarization resistance (LPR), and harmonic distortion analysis (HDA) were used with three-electrode probes to monitor the corrosion occurring in soil in dry and wet conditions near a gas pipeline under cathodic protection. The test site was a cathodic protection (CP) test station where impressed current CP was applied to a 2 in. (5.1 cm) diameter FBE coated steel pipe using an 84 in. (0.2 m) TA-2 high-silicon cast iron anode. Electrochemical measurements were made at three locations, two inside the CP field and one outside the CP field. Electrochemical measurements were first made with the CP system off to establish the baseline corrosion and then with increasing levels of CP. The degree of protection was based on polarized potential and the adequacy of protection was determined by depolarization measurements. CP of an adjacent pipeline did not affect the measurement of either corrosion rate or pitting factor when using buried soil corrosion probes and the EN, LPR, and HDA techniques.

  10. Summary of experimental discussion session at ILWOG42

    SciTech Connect (OSTI)

    Viera, David J [Los Alamos National Laboratory; Dardenne, Yves M [LLNL

    2010-09-21T23:59:59.000Z

    During the ILWOG-42 held at LANL in May of 2010, a set of discussions between scientists from AWE, LANL, and LLNL was held to develop collaborative experiments that would improve radiochemical diagnostic evaluations. DOE headquarters has asked that a 5-year roadmap be developed to resolve outstanding issues. The goal of this discussion was to explore common areas of interest where collaborative experiments could be undertaken to resolve identified problems and to gain support across the weapons program and DOE for this work. Collaboration was encouraged not only between these laboratories, but with University collaborators who are funded through the NNSA Stewardship Science Academic Alliance. In the development of experiments there were some criteria that were established. The uncertainty budgets will need to be assessed for proposed experiments so that potential gains to the programs can be determined. Measurements using different methods should be encouraged to provide greater confidence (and hopefully improved accuracy) in the result. Six distinct subjects were discussed: (1) Experiments at critical assemblies/14-MeV neutron (D+T) facilities; (2) Fission-chain-yield (FCY) energy dependence; (3) Absolute FCY measurements; (4) Measurements of {sup 147}Nd 531-keV absolute gamma-ray intensity; (5) Atom scale cross calibrations; and (6) Other experimental issues. A short summary of the discussions is given.

  11. Climate Change and Place Roundtable Discussion

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    of Urban Development and Climate Change,” 2007. The fullThink about what runaway climate change would mean where youWorld Changing Seattle, WA Climate change is global in scale

  12. LANL Researcher Roger Wiens Discusses ChemCam

    ScienceCinema (OSTI)

    Wiens, Roger

    2014-08-12T23:59:59.000Z

    Discussion of the ChemCam instrument on the Curiosity Rover that occurred during the NASA press conference prior to launch of the Mars Science Laboratory. The ChemCam instrument was developed by Los Alamos National Laboratory and the French Space Institute. Los Alamos National Laboratory researcher Roger Wiens discusses the instrument on this video. ChemCam uses a laser to "zap" features of the Martian landscape and then uses a spectrometer to gather information about the composition of the sample. ChemCam will help the Curiosity Rover determine whether Mars is or was habitable. The Rover is expected to touch down on the Red Planet on August 5, 2012.

  13. Discussion of EIA-411 Data Files

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear21CompanySFoot)YearD e sDiscussion

  14. Application of the Granuflow Process to Pipeline-Transported Coal Slurry CRADA PC96-010, Final Report

    SciTech Connect (OSTI)

    Richard P. Killmeyer; Wu-Wey Wen

    1997-09-24T23:59:59.000Z

    In light of the current difficulties in processing fine coal and the potential for a significant increase in fines due to more demanding quality specifications, the U.S. Department of Energy's Federal Energy Technology Center (FETC) has been involved in the reconstitution of the fine clean coal resulting from advanced fine coal cleaning technologies. FETC has invented and developed a new strategy that combines fine-coal dewatering and reconstitution into one step. The process reduces the moisture content of the clean coal, and alleviates handling problems related to dustiness, stickiness, flowability, and freezing. This process has been named the GranuFlow Process. Early work successfully demonstrated the feasibility of the process for laboratory-scale vacuum filtration dewatering using asphalt emulsion. Further tests focused on the application of the process to a screen-bowl centrifuge via batch mode tests at 300 lb/hr. These tests produced roughly the same results as the laboratory filtration tests did, and they included some testing using Orimulsion, a bitumen emulsion. The Orimulsion seemed to offer greater potential for moisture reduction and was less affected by colder slurry temperatures. Most recently, FETC has conducted several series of tests in its Coal Preparation Process Research Facility. These tests dramatically showed the visible difference in the dewatered product by applying the GranuFlow Process, turning it from a clumpy, wet, sticky material into a granular, dry free-flowing product. In addition, it verified previous results with improvements in moisture content, dustiness, stickiness, and freezing. Orimulsion showed a significant benefit over asphalt emulsion in moisture reduction at additions more than 5%. The overall goal of this project was to successfully apply FETC'S GranuFlow Process to improve coal slurry pipeline operations. Williams Technologies, Inc. (WTI), a leader in pipeline technology, has an interest in reducing the moisture content of the coal at the end of a coal slurry pipeline beyond what is being achieved with conventional mechanical dewatering technology. In addition, they would like to improve the handling characteristics of the dewatered coal. The GranuFlow Process has the potential of assisting in both of these areas, and its degree of applicability needed to be explored. A formal Cooperative Research and Development Agreement (CRADA) between FETC and WTI was signed in November 1996. This CRADA consisted of 6 tasks progressing from preliminary scoping tests to a commercial field test. Task 1 was completed in February 1997, and it provided sufficient information about the applicability of the GranuFlow Process to coal slurry pipelines that further testing was not needed at the present time. Thus the CRADA was terminated.

  15. Carbon Cycle Discussion After the warm-up quiz, discuss the carbon cycle.

    E-Print Network [OSTI]

    Carrington, Emily

    Carbon Cycle Discussion After the warm-up quiz, discuss the carbon cycle. Carbon is one is without carbon. Where else is carbon on our Earth? In rocks, living organisms, the atmosphere, oceans Does carbon stay in one place? What processes include moving carbon? Introduce residence time: How long does

  16. Seismic fragility formulations for segmented buried pipeline systems including the impact of differential ground subsidence

    SciTech Connect (OSTI)

    Pineda Porras, Omar Andrey [Los Alamos National Laboratory; Ordaz, Mario [UNAM, MEXICO CITY

    2009-01-01T23:59:59.000Z

    Though Differential Ground Subsidence (DGS) impacts the seismic response of segmented buried pipelines augmenting their vulnerability, fragility formulations to estimate repair rates under such condition are not available in the literature. Physical models to estimate pipeline seismic damage considering other cases of permanent ground subsidence (e.g. faulting, tectonic uplift, liquefaction, and landslides) have been extensively reported, not being the case of DGS. The refinement of the study of two important phenomena in Mexico City - the 1985 Michoacan earthquake scenario and the sinking of the city due to ground subsidence - has contributed to the analysis of the interrelation of pipeline damage, ground motion intensity, and DGS; from the analysis of the 48-inch pipeline network of the Mexico City's Water System, fragility formulations for segmented buried pipeline systems for two DGS levels are proposed. The novel parameter PGV{sup 2}/PGA, being PGV peak ground velocity and PGA peak ground acceleration, has been used as seismic parameter in these formulations, since it has shown better correlation to pipeline damage than PGV alone according to previous studies. By comparing the proposed fragilities, it is concluded that a change in the DGS level (from Low-Medium to High) could increase the pipeline repair rates (number of repairs per kilometer) by factors ranging from 1.3 to 2.0; being the higher the seismic intensity the lower the factor.

  17. Focus group discussions of daylighting practices

    SciTech Connect (OSTI)

    Roberson, B.F.; Harkreader, S.A.

    1988-11-01T23:59:59.000Z

    This research was sponsored by the US Department of Energy (DOE) Office of Buildings and Community systems and conducted by Pacific Northwest Laboratory (PNL) as part of an ongoing effort to enhance the commercial use of federally developed technologies. One such technology is the use of daylighting practices in the design of nonresidential buildings. This document is a report of the findings from meetings of focus groups conducted to gain insight into building designers' perceptions and attitudes about daylighting systems.

  18. Hurricane-damaged Gulf of Mexico pipeline repaired with cold forging

    SciTech Connect (OSTI)

    Lewis, G. (Texaco Pipeline Inc., Houma, LA (United States)); DeGruy, P. (Texaco Inc., New Orleans, LA (United States)); Avery, L. (Big Inch Marine Systems Inc., Lafayette, LA (United States))

    1993-05-03T23:59:59.000Z

    Damage to Texaco Pipeline Inc.'s Eugene Island Pipeline System (EIPS) in last year's Hurricane Andrew prompted a complex repair project unique for the Gulf of Mexico. Damage, suffered when the anchor of a runaway semisubmersible drilling rig crashed into the 20-in. EPIS during the height of the storm, caused the pipeline to fail under pressure within 48 hr. after start-up following the storm. The paper describes the importance of the EIPS; system safety; Andrew's damage; locating the leak; repair options; the chosen system; mechanical bonding; end connectors and ball flanges; and diving operations.

  19. Pipeline charging of coke ovens with a preheated charge

    SciTech Connect (OSTI)

    Karpov, A.V.; Khadzhioglo, A.V.; Kuznichenko, V.M.

    1983-01-01T23:59:59.000Z

    Work to test a pipeline charging method was conducted at the Konetsk Coke Works (a PK-2K coke oven system with a single gas main, oven width 407 mm, height 4300 mm, effective column 20.0 cm/sub 3/). This method consists of transporting the heated coal charge to the ovens through a pipe by means of steam. the charge is transported by high pressure chamber groups, and loaded by means of systems equipped with devices for separation, withdrawal and treatment of the spent steam. The principal goal of the present investigation was to test technical advances in the emission-free charging of preheated charges. The problem was, first, to create a reliable technology for separation of the steam from the charge immediately before loading it into the oven and, second, to provide a total elimination of emissions, thereby protecting the environment against toxic substances.

  20. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation

    SciTech Connect (OSTI)

    Sofronis, Petros [University of Illinois at Urbana-Champaign] [University of Illinois at Urbana-Champaign; Robertson, Ian M [University of Wisconsin-Madison] [University of Wisconsin-Madison

    2013-08-01T23:59:59.000Z

    Fundamental studies of hydrogen embrittlement of materials using both experimental observations and numerical simulations of the hydrogen/deformation interactions have been conducted. Our approach integrates mechanical property testing at the macro-scale, microstructural analyses and TEM observations of the deformation processes at the micro- and nano-scale, first-principles calculations of interfacial cohesion at the atomic scale, and finite element simulation and modeling at the micro- and macro-level. Focused Ion Beam machining in conjunction with Transmission Electron Microscopy were used to identify the salient micro-mechanisms of failure in the presence of hydrogen. Our analysis of low strength ferritic steels led to the discovery that “quasi-cleavage” is a dislocation plasticity controlled failure mode in agreement with the hydrogen enhanced plasticity mechanism. The microstructure underneath the fracture surface of 304 and 316 stainless steels was found to be significantly more complex than would have been predicted by the traditional models of fatigue. The general refinement of the microstructure that occurred near the fracture surface in the presence of hydrogen was such that one may argue that hydrogen stabilizes microstructural configurations to an extent not achievable in its absence. Finite element studies of hydrogen and deformation field similitude for cracks in real-life pipelines and laboratory fracture specimens yielded that the Single Edge Notch Tension specimen can be used to reliably study hydrogen material compatibility for pipeline structures. In addition, simulation of onset of crack propagation in low strength ferritic systems by void growth indicated that hydrogen can reduce the fracture toughness of the material by as much as 30%. Both experimental observations and numerical studies of hydrogen transport on hydrogen accumulations ahead of a crack tip yielded that dislocation transport can markedly enhance hydrogen populations which in turn can trigger fracture initiation.