Powered by Deep Web Technologies
Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

SPECIAL REPORT Incurred Cost Audit Coverage of Non- Management and Operating Contractors  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13 Page 1 of 1 ThisApril 2, 2015Incurred Cost

2

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

4

Costs Incurred by Selected Tribal Energy Efficiency and Conservation Block Grant Recipients, OAS-RA-13-28  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarterinto PARS | DepartmentEnergyCosts

5

Direct/Indirect Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(CCMD) and describes various estimating techniques for direct and indirect costs. g4301-1chp7.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 7...

6

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...  

Broader source: Energy.gov (indexed) [DOE]

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell Systems for Transportation Applications: 2012 Update Mass Production Cost Estimation of Direct Hydrogen PEM Fuel...

7

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...

8

Estimating Specialty Costs - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project specialty costs and methods of estimating costs for specialty projects. g4301-1chp20.pdf -- PDF Document, 56 KB Writer: John Makepeace Subjects: Administration Management...

9

Cost Model and Cost Estimating Software - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is basically a cost model, which forms the basis for estimating software. g4301-1chp22.pdf -- PDF Document, 190 KB Writer: John Makepeace Subjects: Administration...

10

Startup Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and environmental projects, and estimating guidance for startup costs. g4301-1chp8.pdf -- PDF Document, 8 KB Writer: John Makepeace Subjects: Administration Management...

11

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications: 2012 Update October 18, 2012 Prepared By: Brian D. James Andrew B. Spisak...

12

Cost-Competitive Advanced Thermoelectric Generators for Direct...  

Broader source: Energy.gov (indexed) [DOE]

Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power Cost-Competitive Advanced Thermoelectric Generators for...

13

ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...  

Broader source: Energy.gov (indexed) [DOE]

Low-Cost Direct Bonded Aluminum (DBA) Substrates H. -T. Lin, A. A. Wereszczak, and S. Waters Oak Ridge National Laboratory This presentation does not contain any proprietary,...

14

Cost Transfers Involving Sponsored Projects Directives and Procedures  

E-Print Network [OSTI]

Cost Transfers Involving Sponsored Projects Directives and Procedures Responsible Office: Office.................................................................................................................2 2. Project Management to a project when an award arrived after the budget period which would have allowed the transactions

Jawitz, James W.

15

Low-Cost Direct Bonded Aluminum (DBA) Substrates  

Broader source: Energy.gov (indexed) [DOE]

Low-Cost Direct Bonded Aluminum (DBA) Substrates H. -T. Lin, A. A. Wereszczak, M. L. Santella, and G. Muralidharan Oak Ridge National Laboratory (ORNL) This presentation does not...

16

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review  

Broader source: Energy.gov [DOE]

This presentation reports on direct hydrogen PEMFC manufacturing cost estimation for automotive applications.

17

1366 Direct Wafer: Demolishing the Cost Barrier for Silicon Photovoltaics  

SciTech Connect (OSTI)

The goal of 1366 Direct Wafer™ is to drastically reduce the cost of silicon-based PV by eliminating the cost barrier imposed by sawn wafers. The key characteristics of Direct Wafer are 1) kerf-free, 156-mm standard silicon wafers 2) high throughput for very low CAPEX and rapid scale up. Together, these characteristics will allow Direct Wafer™ to become the new standard for silicon PV wafers and will enable terawatt-scale PV – a prospect that may not be possible with sawn wafers. Our single, high-throughput step will replace the expensive and rate-limiting process steps of ingot casting and sawing, thereby enabling drastically lower wafer cost. This High-Impact PV Supply Chain project addressed the challenges of scaling Direct Wafer technology for cost-effective, high-throughput production of commercially viable 156 mm wafers. The Direct Wafer process is inherently simple and offers the potential for very low production cost, but to realize this, it is necessary to demonstrate production of wafers at high-throughput that meet customer specifications. At the start of the program, 1366 had demonstrated (with ARPA-E funding) increases in solar cell efficiency from 10% to 15.9% on small area (20cm2), scaling wafer size up to the industry standard 156mm, and demonstrated initial cell efficiency on larger wafers of 13.5%. During this program, the throughput of the Direct Wafer furnace was increased by more than 10X, simultaneous with quality improvements to meet early customer specifications. Dedicated equipment for laser trimming of wafers and measurement methods were developed to feedback key quality metrics to improve the process and equipment. Subsequent operations served both to determine key operating metrics affecting cost, as well as generating sample product that was used for developing downstream processing including texture and interaction with standard cell processing. Dramatic price drops for silicon wafers raised the bar significantly, but the developments made under this program have increased 1366 confidence that Direct Wafers can be produced for ~$0.10/W, still nearly 50% lower than current industry best practice. Wafer quality also steadily improved throughout the program, both in electrical performance and geometry. The improvements to electrical performance were achieved through a combination of optimized heat transfer during growth, reduction of metallic impurities to below 10 ppbw total metals, and lowering oxygen content to below 2e17 atoms/cc. Wafer average thickness has been reduced below 200µm with standard deviation less than 20µm. Measurement of spatially varying thickness shortly after wafer growth is being used to continually improve uniformity by adjusting thermal conditions. At the conclusion of the program, 1366 has developed strong relationships with four leading Tier1 cell manufactures and several have demonstrated 17% cell efficiency on Direct Wafer. Sample volumes were limited, with the largest trial consisting of 300 Direct Wafers, and there remains strong pull for larger quantities necessary for qualification before sales contracts can be signed. This will be the focus of our pilot manufacturing scale up in 2014.

Lorenz, Adam [1366 Technologies] [1366 Technologies

2013-08-30T23:59:59.000Z

18

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This report estimates fuel cell system cost for systems produced in the...

19

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

07 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update This report estimates fuel cell system cost for systems...

20

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Application Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application This presentation reports on the status of mass production cost...

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications: 2013 Update Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems...

22

Cost-Competitive Advanced Thermoelectric Generators for Direct...  

Broader source: Energy.gov (indexed) [DOE]

vehicles by 5% using advanced low cost TE technology: - Low cost materials, modules, heat exchangers, power conditioning, and vehicle integration for exhaust gas waste heat...

23

The External Damage Cost of Direct Noise From Motor Vehicles  

E-Print Network [OSTI]

is not an external or unaccounted-for cost of highways ifland, then there is an unaccounted- for cost of highway use;

Delucchi, Mark A.; Hsu, Shi-Ling

1996-01-01T23:59:59.000Z

24

Starship Sails Propelled by Cost-Optimized Directed Energy  

E-Print Network [OSTI]

Microwave propelled sails are a new class of spacecraft using photon acceleration. It is the only method of interstellar flight that has no physics issues. Laboratory demonstrations of basic features of beam-driven propulsion, flight, stability ('beam-riding'), and induced spin, have been completed in the last decade, primarily in the microwave. It offers much lower cost probes after a substantial investment in the launcher. Engineering issues are being addressed by other applications: fusion (microwave, millimeter and laser sources) and astronomy (large aperture antennas). There are many candidate sail materials: carbon nanotubes and microtrusses, graphene, beryllium, etc. For acceleration of a sail, what is the cost-optimum high power system? Here the cost is used to constrain design parameters to estimate system power, aperture and elements of capital and operating cost. From general relations for cost-optimal transmitter aperture and power, system cost scales with kinetic energy and inversely with sail di...

Benford, James

2011-01-01T23:59:59.000Z

25

Check Estimates and Independent Costs - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

estimates and their procedures and various types of independent cost estimates. g4301-1chp13.pdf -- PDF Document, 33 KB Writer: John Makepeace Subjects: Administration Management...

26

Types of Cost Estimates - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CURRENT DOE G 430.1-1 Chp 4, Types of Cost Estimates by John Makepeace Functional areas: Procurement, Project Management The chapter describes the estimates required on...

27

Manufacturing Cost Analysis of 10 kW and 25 kW Direct Hydrogen...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Manufacturing Cost Analysis of 10 kW and 25 kW Direct Hydrogen Polymer Electrolyte Membrane (PEM) Fuel Cell for Material Handling Applications Manufacturing Cost Analysis of 10 kW...

28

DIRECT COSTS OF DISABLING WORKPLACE INJURIES GROW 2.5 PERCENT  

Broader source: Energy.gov [DOE]

April 7, 2003 Annual Liberty Mutual Workplace Safety Index Shows Direct Costs of the Three Leading Causes of Workplace Incidents Grew Significantly Faster...

29

Chapter 23 - Statement of Costs Incurred and Claimed  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccessCO2 Injection Begins8: Variable Frequency

30

Example Cost Codes for Construction Projects - DOE Directives...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and their corresponding cost codes that may be used for construction projects. g4301-1chp16.pdf -- PDF Document, 93 KB Writer: John Makepeace Subjects: Administration Management...

31

Cost Estimation Package - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

components (or elements) of the cost estimation package and their documentation. g4301-1chp2.pdf -- PDF Document, 10 KB Writer: John Makepeace Subjects: ID: DOE G 430.1-1 Chp 2...

32

Cost Codes and the Work Breakdown Structure - DOE Directives...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WBS and the cost code system, and explains the interface between the two systems. g4301-1chp5.pdf -- PDF Document, 44 KB Writer: John Makepeace Subjects: Administration Management...

33

Examples of Cost Estimation Packages - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

34

Life Cycle Cost Estimate - DOE Directives, Delegations, and Requiremen...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

chapter discusses life cycle costs and the role they play in planning. g4301-1chp23.pdf -- PDF Document, 52 KB Writer: John Makepeace Subjects: Administration Management...

35

Activity Based Costing - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

outlines the Activity Based Costing method and discusses applicable uses of ABC. g4301-1chp24.pdf -- PDF Document, 11 KB Writer: John Makepeace Subjects: Administration Management...

36

Cost Estimating Guide, Table of Contents - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1997 CRD: No DNFSB: No Related History Exemptions Standards Related to: DOE G 430.1-1 Chp 9, Operating Costs DOE G 430.1-1 Chp 19, Data Collection and Normalization for the...

37

Use of Cost Estimating Relationships - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

must be aware so the Cost Estimating Relationships can be properly used. g4301-1chp18.pdf -- PDF Document, 41 KB Writer: John Makepeace Subjects: Administration Management...

38

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications number of vehicles it represents, DOE has established detailed cost targets for automotive fuel cell and track the cost of automotive fuel cell systems as progress is made in fuel cell technology. The purpose

39

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update it represents, the DOE has established detailed cost targets for automotive fuel cell systems and components of automotive fuel cell systems as progress is made in fuel cell technology. The purpose of these cost analyses

40

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

1 Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation (2012), annually updated costs analyses will be conducted for PEM fuel cell passenger buses as well established detailed cost targets for automotive fuel cell systems and components. To help achieve

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications for transportation. Fuel cell systems will have to be cost-competitive with conventional and advanced vehicle it represents, the DOE has established detailed cost targets for automotive fuel cell systems and components

42

ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Bonded Aluminum (DBA) Substrates (Agreement ID:23278) 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

43

THE EFFECT OF INCREASING TRANSPORTATION COST ON FOREIGN DIRECT INVESTMENT.  

E-Print Network [OSTI]

broader dataset which has already been developed will be expanded to include the dramatic changes in oil prices pre Y2K and post Y2K. It was hypothesized that results will reflect that the cost of transportation will drive investment closer, rather... on regional country choice of investment. Previous research has confirmed this. Specifically, research conducted in Mileski (2000) has proven that key events that have affected the international oil supply has shown shift in locations chosen for investment...

Gressler, Kimberly

2009-06-09T23:59:59.000Z

44

Cost Estimating Guide - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on γ-Al2O3. |ID#: 19834 Title: CorrelationCostCURRENT

45

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

Application: 2009 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Application: 2009 Update This report is the third annual update of a...

46

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

10 Update Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2010 Update This report is the fourth annual update of a comprehensive...

47

Direct costing  

E-Print Network [OSTI]

on? See aooounting profess ion is LLvilel upon whether the yrinoiy3Les oontainel in the oonoeyt are aoeeptab1 e f ox the above purposes . Xt is genemXXg oonoslel that ths 1RQ 8 of lirsot sos'C ing oan be he 1 pfs1 to ~on eat in oontro31ing oosts... withdrew' This emphasis on profit moment has continued& aud it is still of great importanoe. Xt has increased in oomyleaL~ during the time of the decreasing value ef the doKLar~ awk account- ants are 'still striviug i'ox' a more useful and a mors...

Browning, Donald Bullock

1960-01-01T23:59:59.000Z

48

Cost-Effective Silicon Wafers for Solar Cells: Direct Wafer Enabling Terawatt Photovoltaics  

SciTech Connect (OSTI)

Broad Funding Opportunity Announcement Project: 1366 is developing a process to reduce the cost of solar electricity by up to 50% by 2020—from $0.15 per kilowatt hour to less than $0.07. 1366’s process avoids the costly step of slicing a large block of silicon crystal into wafers, which turns half the silicon to dust. Instead, the company is producing thin wafers directly from molten silicon at industry-standard sizes, and with efficiencies that compare favorably with today’s state-of-the-art technologies. 1366’s wafers could directly replace wafers currently on the market, so there would be no interruptions to the delivery of these products to market. As a result of 1366’s technology, the cost of silicon wafers could be reduced by 80%.

None

2010-01-15T23:59:59.000Z

49

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2009 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report is the third annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing cost of complete 80 kWnet direct hydrogen proton exch

50

Mass Production Cost Estimation For Direct H2 PEM Fuel Cell Systesm for Automotive Applications: 2010 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report is the fourth annual update of a comprehensive automotive fuel cell cost analysis. It contains estimates for material and manufacturing costs of complete 80 kWnet direct?hydrogen proton ex

51

Rheology and stability kinetics of bare silicon nanoparticle inks for low-cost direct printing  

SciTech Connect (OSTI)

Highly dispersed and stable silicon nanoparticles ink is formulated for its application in direct printing or printable electronics. These dispersions are prepared from free-standing silicon nanoparticles which are not capped with any organic ligand, making it suitable for electronic applications. Silicon nanoparticles dispersions are prepared by suspending the nanoparticles in benzonitrile or ethanol by using polypropylene glycol (PPG) as a binder. All the samples show typical shear thinning behavior while the dispersion samples show low viscosities signifying good quality dispersion. Such thinning behavior favors in fabrication of dense films with spin-coating or patterns with drop casting. The dispersion stability is monitored by turbiscan measurements showing good stability for one week. A low-cost direct printing method for dispersion samples is also demonstrated to obtain micro-sized patterns. Low electrical resistivity of resulting patterns, adjustable viscosity and good stability makes these silicon nanoparticles dispersions highly applicable for direct printing process.

More, Priyesh V.; Jeong, Sunho; Seo, Yeong-Hui; Ryu, Beyong-Hwan; Choi, Youngmin [Advanced Materials Division, Korea Research Institute of Chemical Technology 141 Gajeong-ro, Yuseong-gu, Daejeon 305-600 (Korea, Republic of); Kim, Seong Jip [Advanced Materials Division, Korea Research Institute of Chemical Technology 141 Gajeong-ro, Yuseong-gu, Daejeon 305-600 Korea and Department of Materials Science and Engineering, Korea University 5-1 Anam-Dong, Seongbuk-gu, Seoul 136-701 (Korea, Republic of); Nahm, Sahn [Department of Materials Science and Engineering, Korea University 5-1 Anam-Dong, Seongbuk-gu, Seoul 136-701 (Korea, Republic of)

2013-12-16T23:59:59.000Z

52

Low-Cost Direct Bonded Aluminum (DBA) Substrates | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andofIanJenniferLeslieEnergy LoanOfficialLow-Cost Direct Bonded

53

acute treatment costs: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

In addition, treatment of acute PID and its complications incurs substantial health care costs. Prevention of these long-term sequelae is dependent upon development of...

54

Estimating Administrative and Procedural Costs Natural Resource Restoration Settlements  

E-Print Network [OSTI]

assessment costs incurred by natural resource trustee agencies (i.e., the federal, state, Indian tribe, and, trustee costs #12;The goal of natural resource damage assessment actions undertaken subsequent to the trustees, or some combination thereof. The damage assessment costs incurred by the natural resource

55

Performance and cost models for the direct sulfur recovery process. Task 1 Topical report, Volume 3  

SciTech Connect (OSTI)

The purpose of this project is to develop performance and cost models of the Direct Sulfur Recovery Process (DSRP). The DSRP is an emerging technology for sulfur recovery from advanced power generation technologies such as Integrated Gasification Combined Cycle (IGCC) systems. In IGCC systems, sulfur present in the coal is captured by gas cleanup technologies to avoid creating emissions of sulfur dioxide to the atmosphere. The sulfur that is separated from the coal gas stream must be collected. Leading options for dealing with the sulfur include byproduct recovery as either sulfur or sulfuric acid. Sulfur is a preferred byproduct, because it is easier to handle and therefore does not depend as strongly upon the location of potential customers as is the case for sulfuric acid. This report describes the need for new sulfur recovery technologies.

Frey, H.C. [North Carolina State Univ., Raleigh, NC (United States); Williams, R.B. [Carneigie Mellon Univ., Pittsburgh, PA (United States)

1995-09-01T23:59:59.000Z

56

COMPLETELY DC-FREE DIRECT SEQUENCE SPECTRUM SPREADING SCHEME FOR LOW POWER, LOW COST, DIRECT CONVERSION TRANSCEIVER  

E-Print Network [OSTI]

call the offset code spreading scheme. By employing the scheme, we can implement a direct- conversion- level design. The direct conversion receiver architecture combined with D-BPSK (differential, there are some design problems. In a direct conversion receiver, DC offset due to carrier leakage and 1/f mixer

Lee, Thomas H.

57

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

technology * 2015 projected technology 2 Determine costs for these 3 tech level Fuel Cell System Battery System Storage 2. Determine costs for these 3 tech level systems at 5...

58

Pension costs and liabilities  

E-Print Network [OSTI]

be to charge the cost over the current and subsequent years on the assumption that the cost, even though measured by past services, is incurred in contemplation of present and future 1 services. 1'he development of accounting thought concerning retire...? present liabilities are under- stated and owner's equity is overstated by a corresponding amount. It seems, however, that charging retained earnings with the past service cost does not, represent the true picture. Pension payments based solely on past...

Courtney, Harley Macon

1961-01-01T23:59:59.000Z

59

A direct thin-film path towards low-cost large-area III-V photovoltaics  

E-Print Network [OSTI]

A direct thin-film path towards low-cost large-area III-V photovoltaics Rehan Kapadia1,2 *, Zhibin-V photovoltaics (PVs) have demonstrated the highest power conversion efficiencies for both single- and multi times, and large equipment investments restrict applications to concentrated and space photovoltaics

California at Irvine, University of

60

PERFECT Stroke : PERFormance, Effectiveness, and Costs of treatment episodes in Stroke.  

E-Print Network [OSTI]

??Stroke is a major cause of death and disability, incurs significant costs to healthcare systems, and inflicts severe burden to the whole society. Stroke care… (more)

Meretoja, Atte

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - IG Testimony - UCLANL Cost Incurred- Long9 delivered.doc  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMAMayCross Reference4 DepartmentFinaland

62

Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-CostManufacturingMarginalMarket|

63

REQUEST FOR INDIRECT COST WAIVER I. Project Director  

E-Print Network [OSTI]

REQUEST FOR INDIRECT COST WAIVER I. Project Director: Department: Project Title: Project Sponsor without fully recovering the institutional indirect costs which will be incurred in conducting the project COSTS 1. FULL: OF I. A. C. 2. PARTIAL: OF H. B. K. TOTAL PROJECT COSTS L. INDIRECT COSTS TO BE WAIVED, J

Krovi, Venkat

64

Measuring the Costs and Economic, Social, and Environmental Benefits of Nationwide Geothermal Heat Pump Deployment and The Potential Employment, Energy, and Environmental Impacts of Direct Use Applications  

Broader source: Energy.gov [DOE]

Project objectives: To measure the costs and economic; social; and environmental benefits of nationwide geothermal heat pump (GHP) deployment; and To survey selected states as to their potential employment; energy use and savings; and environmental impact for direct use applications.

65

Comparison of management, overhead, and direct costs of six projects managed by the Department of Energy and Government-Owned, Contractor-Operated Laboratories  

SciTech Connect (OSTI)

The report covers management, overhead, and direct cost data on six DOE projects - three managed directly by DOE, and three managed for DOE by government-owned, contractor-operated (GOCO) laboratories. These data provide comparison for decisions on contracting out for project management services. (GHT)

Not Available

1981-09-30T23:59:59.000Z

66

Cost Constrained Spectrum Sensing in Cognitive Radio Networks  

E-Print Network [OSTI]

networks considering its system level cost that accounts for the local processing cost of sensing (sample collection and energy calculation at each secondary user) as well as the transmission cost (forwarding energy for various factors that contribute to the cost incurred by spectrum sensing. In this paper, we study energy

Yener, Aylin

67

INTRODUCTION Currently, wind turbines can incur unforeseen damage up to five times a year.  

E-Print Network [OSTI]

1 1 INTRODUCTION Currently, wind turbines can incur unforeseen damage up to five times a year. Particularly during bad weather, wind turbines located offshore are difficult to access for visual inspection functional modules that track changes in the global dynamic behaviour of both the turbine tower and blade

Lynch, Jerome P.

68

Directions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directions Where We Are Directions The Bradbury Science Museum is located at 1350 Central Avenue Los Alamos, NM 87544 Los Alamos (elevation 7,355 feet) is perched high atop the...

69

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2007 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report estimates fuel cell system cost for systems produced in the years 2007, 2010, and 2015, and is the first annual update of a comprehensive automotive fuel cell cost analysis.

70

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update  

Fuel Cell Technologies Publication and Product Library (EERE)

This report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

71

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for Automotive Applications: 2008 Update  

Broader source: Energy.gov [DOE]

Report estimates fuel cell system cost for systems produced in the years 2006, 2010, and 2015, and is the second annual update of a comprehensive automotive fuel cell cost analysis.

72

SDSU RESEARCH FOUNDATION COST SHARING POLICY AND PROCEDURES The purpose of these guidelines is to provide direction in accumulating and reporting cost  

E-Print Network [OSTI]

SDSU RESEARCH FOUNDATION COST SHARING POLICY AND PROCEDURES PURPOSE The purpose of these guidelines represent the recipient's (that is, SDSU, the Campanile Foundation, or SDSU Research Foundation) cash outlay and/or non-Federal third parties. POLICY: It is the policy of the Foundation and the University

Ponce, V. Miguel

73

Direct  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape,PhysicsDileepDirac Charge Dynamcs inDirect

74

Low-cost, highly efficient, and tunable ultrafast laser technology based on directly diode-pumped Cr:Colquiriites  

E-Print Network [OSTI]

This doctoral project aims to develop robust, ultra low-cost ($5,000-20,000), highly-efficient, and tunable femtosecond laser technology based on diode-pumped Cr:Colquiriite gain media (Cr:LiCAF, Cr3+:LiSAF and Cr:LiSGaF). ...

Demirbas, Umit

2010-01-01T23:59:59.000Z

75

Perceptual decision processes flexibly adapt to avoid change-of-mind motor costs  

E-Print Network [OSTI]

Perceptual decision processes flexibly adapt to avoid change- of-mind motor costs Jeff Moher dynamically adjust perceptual decision-making processes to avoid high motor costs incurred by a change of mind flexibly adapt to avoid change-of-mind motor costs. Journal of Vision, 14(8):1, 1­13, http

Song, Joo-Hyun

76

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

77

A Low-cost, High-yield Process for the Direct Productin of High Energy Density Liquid Fuel from Biomass  

SciTech Connect (OSTI)

The primary objective and outcome of this project was the development and validation of a novel, low-cost, high-pressure fast-hydropyrolysis/hydrodeoxygenation (HDO) process (H{sub 2}Bioil) using supplementary hydrogen (H{sub 2}) to produce liquid hydrocarbons from biomass. The research efforts under the various tasks of the project have culminated in the first experimental demonstration of the H2Bioil process, producing 100% deoxygenated >C4+ hydrocarbons containing 36-40% of the carbon in the feed of pyrolysis products from biomass. The demonstrated H{sub 2}Bioil process technology (i.e. reactor, catalyst, and downstream product recovery) is scalable to a commercial level and is estimated to be economically competitive for the cases when supplementary H{sub 2} is sourced from coal, natural gas, or nuclear. Additionally, energy systems modeling has revealed several process integration options based on the H{sub 2}Bioil process for energy and carbon efficient liquid fuel production. All project tasks and milestones were completed or exceeded. Novel, commercially-scalable, high-pressure reactors for both fast-hydropyrolysis and hydrodeoxygenation were constructed, completing Task A. These reactors were capable of operation under a wide-range of conditions; enabling process studies that lead to identification of optimum process conditions. Model compounds representing biomass pyrolysis products were studied, completing Task B. These studies were critical in identifying and developing HDO catalysts to target specific oxygen functional groups. These process and model compound catalyst studies enabled identification of catalysts that achieved 100% deoxygenation of the real biomass feedstock, sorghum, to form hydrocarbons in high yields as part of Task C. The work completed during this grant has identified and validated the novel and commercially scalable H2Bioil process for production of hydrocarbon fuels from biomass. Studies on model compounds as well as real biomass feedstocks were utilized to identify optimized process conditions and selective HDO catalyst for high yield production of hydrocarbons from biomass. In addition to these experimental efforts, in Tasks D and E, we have developed a mathematical optimization framework to identify carbon and energy efficient biomass-to-liquid fuel process designs that integrate the use of different primary energy sources along with biomass (e.g. solar, coal or natural gas) for liquid fuel production. Using this tool, we have identified augmented biomass-to-liquid fuel configurations based on the fast-hydropyrolysis/HDO pathway, which was experimentally studied in this project. The computational approach used for screening alternative process configurations represents a unique contribution to the field of biomass processing for liquid fuel production.

Agrawal, Rakesh

2014-02-21T23:59:59.000Z

78

Costing of Joining Methods -Arc Welding Costs  

E-Print Network [OSTI]

Costing of Joining Methods - Arc Welding Costs ver. 1 ME 6222: Manufacturing Processes and Systems.S. Colton © GIT 2009 5 #12;LaborLabor Di t ti f ldi· Direct time of welding ­ time to produce a length of weld ­ labor rate ­ multiplication gives labor cost per length · Set-up time, etc. · Personal time

Colton, Jonathan S.

79

Indirect Cost (IDC) Return Distribution Indirect costs are required to offset the overhead expenses incurred by the institution in order to  

E-Print Network [OSTI]

by Fiscal Years, then by Fiscal Periods (July=01, Aug=02, etc.). Copy fiscal year from the memo to cell A6 (you will only use cell A21 if completing return for multiple fiscal years). Then copy the fiscal periods from the memo to cell E5. b) Investigator: List all principle investigators that will be receiving

80

Postcard: Minimizing Costs on Inter-Datacenter Traffic with Store-and-Forward  

E-Print Network [OSTI]

Postcard: Minimizing Costs on Inter-Datacenter Traffic with Store-and-Forward Yuan Feng, Baochun Li--It is typical for cloud providers to operate a number of geographically distributed datacenters, where inter-datacenter such inter-datacenter traffic incurs substantial operational costs that are charged by ISPs, it varies

Li, Baochun

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

82

Vehicle Technologies Office Merit Review 2014: Significant Cost Improvement of Li-ion Cells Through Non-NMP Electrode Coating, Direct Separator Coating, and Fast Formation Technologies  

Broader source: Energy.gov [DOE]

Presentation given by Johnson Controls at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about significant cost improvement...

83

Operating Costs Estimates Cost Indices  

E-Print Network [OSTI]

to update costs of specific equipment, raw material or labor or CAPEX and OPEX of entire plants Cost Indices

Boisvert, Jeff

84

Vehicle Technologies Office Merit Review 2014: Cost-Competitive Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power  

Broader source: Energy.gov [DOE]

Presentation given by General Motors at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about cost-competitive advanced...

85

Reactor Cost Analysis Brian James  

E-Print Network [OSTI]

Reactor Cost Analysis Brian James Directed Technologies, Inc. 6-7 November 2007 This presentation specification & optimization · Capital cost estimation · Projected hydrogen $/kg #12;Directed Technologies, Inc/WGS Membrane Reactor OTM/ Water-Splitting ANL With WGS #12;Directed Technologies, Inc. 6-7 November 2007 BILIWG

86

40900 Federal Register / Vol. 74, No. 155 / Thursday, August 13, 2009 / Rules and Regulations addition to the direct costs described in  

E-Print Network [OSTI]

of the Proposed Rule IV. Legal Authority V. Environmental Impact VI. Analysis of Economic Impacts A. Objectives of the Impact E. Benefits of the Final Rule F. Costs of the Final Rule G. Minimizing the Impact on Small. The documentation must be accompanied by a statement that an independent certified public accountant has reviewed

Lee, Daeyeol

87

Universal model for water costs of gas exchange by animals and plants  

E-Print Network [OSTI]

terrestrial animals and plants exchange O2 and CO2 with the atmosphere and thereby incur costs in the currency Hemphill Brown, University of New Mexico, Albuquerque, NM, and approved March 30, 2010 (received for review), the steepness of the gradients for gas and vapor, and the transport mode (convective or diffusive). Model

88

Audit of Incurred Costs for UT-Battelle under Department of Energy Contract No. DE-AC05-00OR22725 during Fiscal Year 2012  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EERE BlogAttachmentFlash2011-21 Audit Letter6-0136 AuditOAS-RA-10-03Audit

89

Questioned, Unresolved and Potentially Unallowable Costs Incurred by Los Alamos National Laboratory During Fiscal Year 2012, OAS-L-13-02  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.DepartmentFertilizer usedAugustList?in the

90

Questioned, Unresolved, and Potentially Unallowable Costs Incurred by Los Alamos National Laboratory during Fiscal Years 2008 and 2009, OAS-L-12-04  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.DepartmentFertilizer usedAugustList?in

91

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

92

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

93

A study of design oriented cost estimation  

E-Print Network [OSTI]

except for the cost of material, and does not distinguish direct and indirect costs involved in the production. Vernon (1968) describes costs as standard or actual. Standard cost is a predicted cost reflecting what a part or product should cost, while... parts only. Some researchers have used the component cost in making decisions regarding the manufacturing process. Egbelu and others (Egbelu et al. , 1982) describe a model for making decisions about cast parts. They define a relationship associating...

Raman, Ramchand P.

1992-01-01T23:59:59.000Z

94

The Program Administrator Cost of Saved Energy for Utility Customer-Funded Energy Efficiency Programs  

SciTech Connect (OSTI)

End-use energy efficiency is increasingly being relied upon as a resource for meeting electricity and natural gas utility system needs within the United States. There is a direct connection between the maturation of energy efficiency as a resource and the need for consistent, high-quality data and reporting of efficiency program costs and impacts. To support this effort, LBNL initiated the Cost of Saved Energy Project (CSE Project) and created a Demand-Side Management (DSM) Program Impacts Database to provide a resource for policy makers, regulators, and the efficiency industry as a whole. This study is the first technical report of the LBNL CSE Project and provides an overview of the project scope, approach, and initial findings, including: • Providing a proof of concept that the program-level cost and savings data can be collected, organized, and analyzed in a systematic fashion; • Presenting initial program, sector, and portfolio level results for the program administrator CSE for a recent time period (2009-2011); and • Encouraging state and regional entities to establish common reporting definitions and formats that would make the collection and comparison of CSE data more reliable. The LBNL DSM Program Impacts Database includes the program results reported to state regulators by more than 100 program administrators in 31 states, primarily for the years 2009–2011. In total, we have compiled cost and energy savings data on more than 1,700 programs over one or more program-years for a total of more than 4,000 program-years’ worth of data, providing a rich dataset for analyses. We use the information to report costs-per-unit of electricity and natural gas savings for utility customer-funded, end-use energy efficiency programs. The program administrator CSE values are presented at national, state, and regional levels by market sector (e.g., commercial, industrial, residential) and by program type (e.g., residential whole home programs, commercial new construction, commercial/industrial custom rebate programs). In this report, the focus is on gross energy savings and the costs borne by the program administrator—including administration, payments to implementation contractors, marketing, incentives to program participants (end users) and both midstream and upstream trade allies, and evaluation costs. We collected data on net savings and costs incurred by program participants. However, there were insufficient data on participant cost contributions, and uncertainty and variability in the ways in which net savings were reported and defined across states (and program administrators).

Billingsley, Megan A.; Hoffman, Ian M.; Stuart, Elizabeth; Schiller, Steven R.; Goldman, Charles A.; LaCommare, Kristina

2014-03-19T23:59:59.000Z

95

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network [OSTI]

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities...

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

96

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

Mass Production Cost Estimation for Direct H2 PEM Fuel CellCost Analysis of Fuel Cell Systems for Transportation - Compressed Hydrogen and PEM

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

97

Operating Costs - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that all elements of the project have been considered and properly estimated. g4301-1chp9.pdf -- PDF Document, 14 KB Writer: John Makepeace Subjects: Administration Management...

98

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining% accuracy. ­ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ­ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships · Capital Costs (or

Boisvert, Jeff

99

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main classes of capital costs: 1. Depreciable Investment: · Investment allocated

Boisvert, Jeff

100

ISU Sponsored Programs Costing Policy Iowa State University  

E-Print Network [OSTI]

what costs are allowable on federally funded grants, contracts and cooperative agreements (collectively). These federal regulations require that the same types of costs be treated consistently as either direct costs and various sponsor rules and regulations. II. Definitions Direct Costs OMB Circular A-21, Section D.1, states

Daniels, Thomas E.

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

102

Cost Efficient Datacenter Selection for Cloud Services  

E-Print Network [OSTI]

Cost Efficient Datacenter Selection for Cloud Services Hong Xu, Baochun Li henryxu, bli and performance. They need an effective way to direct the user requests to a suitable datacenter, in a cost efficient manner. Previ- ous work focused mostly on the electricity cost of datacenters. The approaches

Li, Baochun

103

Deemed Savings Estimates for Legacy Air Conditioning and WaterHeating Direct Load Control Programs in PJM Region  

SciTech Connect (OSTI)

During 2005 and 2006, the PJM Interconnection (PJM) Load Analysis Subcommittee (LAS) examined ways to reduce the costs and improve the effectiveness of its existing measurement and verification (M&V) protocols for Direct Load Control (DLC) programs. The current M&V protocol requires that a PURPA-compliant Load Research study be conducted every five years for each Load-Serving Entity (LSE). The current M&V protocol is expensive to implement and administer particularly for mature load control programs, some of which are marginally cost-effective. There was growing evidence that some LSEs were mothballing or dropping their DLC programs in lieu of incurring the expense associated with the M&V. This project had several objectives: (1) examine the potential for developing deemed savings estimates acceptable to PJM for legacy air conditioning and water heating DLC programs, and (2) explore the development of a collaborative, regional, consensus-based approach for conducting monitoring and verification of load reductions for emerging load management technologies for customers that do not have interval metering capability.

Goldman, Charles

2007-03-01T23:59:59.000Z

104

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

105

Directives Tools  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Useful links and resources for Directives Writers, Directives Point of Contact (DPCs), Subject Matter Experts (SMEs), and Draft Directive Reviewers.

106

US nuclear power plant operating cost and experience summaries  

SciTech Connect (OSTI)

NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

Kohn, W.E.; Reid, R.L.; White, V.S.

1998-02-01T23:59:59.000Z

107

Cost Accounting System for fusion studies  

SciTech Connect (OSTI)

A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program.

Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

1985-12-01T23:59:59.000Z

108

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

109

Evaporative Roof Cooling- A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the “Energy Crisis” Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show direct energy savings...

Abernethy, D.

110

Evaporative Roof Cooling - A Simple Solution to Cut Cooling Costs  

E-Print Network [OSTI]

Since the "Energy Crisis" Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retrofit installations show direct energy savings...

Abernethy, D.

1985-01-01T23:59:59.000Z

111

Updating Texas Energy Cost Containment Audit Reports  

E-Print Network [OSTI]

In 1984 and 1986, 35.3 million square feet of state owned buildings were audited to identify cost saving retrofit projects. Originally intended for direct legislative funding or bond sales, funding became available in 1989 through oil overcharge...

Burke, T. E.; Heffington, W. M.

1989-01-01T23:59:59.000Z

112

Directed Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directed Energy The Directed Energy Program provides laser systems design, engineering and production for specific applications and missions, experimentally validated...

113

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

114

Unit costs of waste management operations  

SciTech Connect (OSTI)

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

115

Estimating Methods - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

direct costs, and other estimating considerations are discussed in this chapter. g4301-1chp15.pdf -- PDF Document, 28 KB Writer: John Makepeace Subjects: Administration Management...

116

Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine...  

Broader source: Energy.gov (indexed) [DOE]

in Gasoline Turbocharged Direct Injection (GTDI) engine technology in the near term as a cost effective, high volume, fuel economy solution, marketed globally as EcoBoost...

117

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

118

Development of Cost-Competitive Advanced Thermoelectric Generators...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advanced Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat into Useful Electrical Power Development of Cost-Competitive Advanced Thermoelectric...

119

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

120

Systems Engineering Cost Estimation  

E-Print Network [OSTI]

on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

Bryson, Joanna J.

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

122

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

123

OOTW COST TOOLS  

SciTech Connect (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

124

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Elec Del Cali: Del Investment Cost Delivery Cost OperatingCost Feedstock Cost Investment Cost Delivery Cost Operatingcosts Annualized investment cost, 1000$/yr Total annualized

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

125

Environmental Cost Analysis  

E-Print Network [OSTI]

Environmental Cost Analysis David Edge Texas Natural Resource Conservation Commission 131 ESL-IE-00-04-21 Proceedings from the Twenty-second National Industrial Energy Technology Conference, Houston, TX, April 5-6, 2000 Tuas Natural... Resource Conservation CorDDliuion Environmental Cost Analysis Presented By David Edge Determine the Costs c> Input co Output c> Hidden c> Capital (non recurring) Envirormenlal Cost Analy.;is "There has to be a measurable result...

Edge, D.

126

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

127

A royalty pain in the gas: What costs may be properly deducted from a gas royalty interest?  

SciTech Connect (OSTI)

It is emphasized that parties contracting for oil and gas leases are always free to allocate the costs of compression, transportation and processing in their agreements, thereby avoiding many potential problems. However, it must be recognized that all too often lease agreements fail to apportion expenses that may be incurred after the discovery of oil or gas. In the likely event that the West Virginia courts are faced with this issue, they would be wise to adopt the implied duty to market theory, thereby, putting the onus on the lessee to either provide up front in the lease for the apportionment of costs after the discovery of the gas, or in those instances where the lease is silent as to who will incur the cost, to place the burden on the lessee to cover those costs. Regarding transportation costs, even in jurisdictions such as Oklahoma, where the lessee is obligated to develop the gas he has found so that it will bring the highest possible market value, the lessee is not required to provide for pipeline facilities beyond the lease premises. Kansas courts have also held that the lessee has a general duty to see that the gas is marketed, but that it is not required to pay the lessor`s share of transportation charges form the well to some distant place. Thus, in West Virginia when a gas lease is silent as what costs a lessee may properly deduct from a lessor`s royalty payment, the lessee should bear the costs under the implied duty to market theory if those costs do not involve enhancing the product or transporting it to some place of sale off the leased premises.

Raynes, R.S. Jr.

1996-10-01T23:59:59.000Z

128

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

129

Energy and Demand Savings from Implementation Costs in Industrial Facilities  

E-Print Network [OSTI]

1 ENERGY AND DEMAND SAVINGS FROM IMPLEMENTATION COSTS IN INDUSTRIAL FACILITIES 1 Razinha, J.A. and Heffington, W.M. Industrial Assessment Center and Mechanical Engineering Department Texas A&M University, College Station, Texas 77843.... noted that a direct calculation of cost savings from the implementation cost could eliminate as much as 30% of the preparation time (and associated cost) for the LoanSTAR reports. The savings result from not having to calculate energy or demand...

Razinha, J. A.; Heffington, W. M.

130

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

Costs Annualized Investment Cost, 1000$/yr Total AnnualizedH2 Fueling Stations Investment Cost Cost ($/yr) OperatingH2 Fueling Stations Investment Cost Cost ($/kg) Operating

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

131

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

132

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

133

Directives System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Department of Energy (DOE) Directives System is the means by which DOE policies, requirements, and responsibilities are developed and communicated throughout the Department. Directives are used to inform, direct, and guide employees in the performance of their jobs, and to enable employees to work effectively within the Department and with agencies, contractors, and the public. Cancels: DOE O 251.1, DOE M 251.1-1

1998-01-30T23:59:59.000Z

134

Hydrogen and Infrastructure Costs  

Broader source: Energy.gov (indexed) [DOE]

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

135

Target Cost Management Strategy  

E-Print Network [OSTI]

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

136

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

137

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

138

Apportioning Climate Change Costs  

E-Print Network [OSTI]

Apportioning Climate Change Costs Daniel A. Farber* I. II.ON CLIMATE CHANGE FOUR QUESTIONS ABOUTof how to respond to climate change. Most public attention

Farber, Daniel A.

2008-01-01T23:59:59.000Z

139

Cost effectiveness of recycling: A systems model  

SciTech Connect (OSTI)

Highlights: • Curbside collection of recyclables reduces overall system costs over a range of conditions. • When avoided costs for recyclables are large, even high collection costs are supported. • When avoided costs for recyclables are not great, there are reduced opportunities for savings. • For common waste compositions, maximizing curbside recyclables collection always saves money. - Abstract: Financial analytical models of waste management systems have often found that recycling costs exceed direct benefits, and in order to economically justify recycling activities, externalities such as household expenses or environmental impacts must be invoked. Certain more empirically based studies have also found that recycling is more expensive than disposal. Other work, both through models and surveys, have found differently. Here we present an empirical systems model, largely drawn from a suburban Long Island municipality. The model accounts for changes in distribution of effort as recycling tonnages displace disposal tonnages, and the seven different cases examined all show that curbside collection programs that manage up to between 31% and 37% of the waste stream should result in overall system savings. These savings accrue partially because of assumed cost differences in tip fees for recyclables and disposed wastes, and also because recycling can result in a more efficient, cost-effective collection program. These results imply that increases in recycling are justifiable due to cost-savings alone, not on more difficult to measure factors that may not impact program budgets.

Tonjes, David J., E-mail: david.tonjes@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States); Waste Reduction and Management Institute, School of Marine and Atmospheric Sciences, Stony Brook University, Stony Brook, NY 11794-5000 (United States); Center for Bioenergy Research and Development, Advanced Energy Research and Technology Center, Stony Brook University, 1000 Innovation Rd., Stony Brook, NY 11794-6044 (United States); Mallikarjun, Sreekanth, E-mail: sreekanth.mallikarjun@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States)

2013-11-15T23:59:59.000Z

140

U.S. Nuclear Power Plant Operating Cost and Experience Summaries  

SciTech Connect (OSTI)

The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports.

Reid, RL

2003-09-18T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Site restoration: Estimation of attributable costs from plutonium-dispersal accidents  

SciTech Connect (OSTI)

A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

1996-05-01T23:59:59.000Z

143

Development of a mobile laboratory for analyses at uranium cleanup sites resulting in significant time and cost savings  

SciTech Connect (OSTI)

A mobile laboratory was developed for the analysis of {sup 230}Th in soil at Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) sites to speed sample turnaround time and reduce the cost of using commercial laboratories. The laboratory utilizes recent developments in microwave acid dissolution, nuclide-specific extraction with extractive scintillators, and liquid scintillation alpha spectrometry to give results with an estimated minimum detectable concentration of 52 Bq kg{sup -1} (1.4 pCi g{sup -1}) for a 300-s count using a 1-g sample. The analysis time for {sup 230}Th is 16 h for eight samples, excluding quality control samples, at a cost of approximately $30 per sample. No significant additional time or costs are incurred by performing uranium analysis. As a result savings of up to $40,000 per week can be realized on the UMTRA project.

Bianconi, J. [RUST Federal Services, Inc., Albuquerque, NM (United States)

1994-12-31T23:59:59.000Z

144

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

145

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

146

Directives Help  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a number of ways in which you may get to the information you need.

147

''Measuring the Costs of Climate Change Policies''  

SciTech Connect (OSTI)

Studies of the costs of climate change policies have utilized a variety of measures or metrics for summarizing costs. The leading economic models have utilized GNP, GDP, the ''area under a marginal cost curve,'' the discounted present value of consumption, and a welfare measure taken directly from the utility function of the model's representative agent (the ''Equivalent Variation''). Even when calculated using a single model, these metrics do not necessarily give similar magnitudes of costs or even rank policies consistently. This paper discusses in non-technical terms the economic concepts lying behind each concept, the theoretical basis for expecting each measure to provide a consistent ranking of policies, and the reasons why different measures provide different rankings. It identifies a method of calculating the ''Equivalent Variation'' as theoretically superior to the other cost metrics in ranking policies. When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P.M.

2003-05-09T23:59:59.000Z

148

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Automotive Applications Jayanti Sinha Stephen Lasher Yong Yang Peter Kopf Fuel Cell Tech Team Review September 24, 2008 TIAX LLC 15 Acorn Park Cambridge, MA 02140-2390...

149

Low-Cost Direct Bonded Aluminum (DBA) Substrates  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10IO1OP001Long-Term StorageDepartmentSystem forTextileManaged

150

Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADA and DOW Automotive) |and DPFDirectApplications:

151

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(say, a trip) and such factors are not fully captured in this dataset. 9. Older combined cycle units were a step change in lower operating costs due to cycling...

152

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

153

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

154

Investments of uncertain cost  

E-Print Network [OSTI]

I study irreversible investment decisions when projects take time to complete, and are subject to two types of uncertainty over the cost of completion. The first is technical uncertainty, i.e., uncertainty over the amount ...

Pindyck, Robert S.

1992-01-01T23:59:59.000Z

155

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... January 1960 Ma/or Sub)acts Accounting STANOAHD COSTS FOR LABOR ND, NURUL ABSAR KHAN Approved as t style and content bys Chairman of Committee Head of Hepartment January 1960 The author acknowledges his indebtedness to Mr. T. M. Leland, Mr. T. D...

Khan, Mohammed Nurul Absar

1960-01-01T23:59:59.000Z

156

Cost-Causation-Based Tariffs for Wind Ancillary Service Impacts: Preprint  

SciTech Connect (OSTI)

Conference paper discussing the integration cost of wind. Although specific tariffs for wind generation for ancillary services are uncommon, we anticipate that balancing authorities (control areas) and other entities will move toward such tariffs. Tariffs for regulation and imbalance services should be cost-based, recognize the relevant time scales that correspond with utility operational cycles, and properly allocate those costs to those entities that cause the balancing authority to incur the costs. In this paper, we present methods for separating wind's impact into regulation and load following (imbalance) time scales. We show that approximating these impacts with simpler methods can significantly distort cost causation and even cause confusion between the relevant time scales. We present results from NREL's wind data collection program to illustrate the dangers of linearly scaling wind resource data from small wind plants to approximate the wind resource data from large wind plants. Finally, we provide a framework for developing regulation and imbalance tariffs, we outline methods to begin examining contingency reserve requirements for wind plants, we provide guidance on the important characteristics to consider, and we provide hypothetical cases that the tariff can be tested against to determine whether the results are desired.

Kirby, B.; Milligan, M.; Wan, Y.

2006-06-01T23:59:59.000Z

157

Cost-effectiveness analysis of effluent standards and limitations for the metal finishing industry. Final report  

SciTech Connect (OSTI)

The report summarizes the results of a cost-effectiveness analysis of the metal finishing industry. The analysis considers the cost-effectiveness of the final metal finishing regulations for direct and indirect dischargers.

Not Available

1983-06-01T23:59:59.000Z

158

Light-Weight, Low-Cost, Single-Phase, Liquid-Cooled Cold Plate (Presentation)  

SciTech Connect (OSTI)

This presentation, 'Light-Weight, Low-Cost, Single-Phase Liquid-Cooled Cold Plate,' directly addresses program goals of increased power density, specific power, and lower cost of power electronics components through improved thermal management.

Narumanchi, S.

2013-07-01T23:59:59.000Z

159

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network [OSTI]

the premium value of solar PV power to 0%-20% again. Whilepower to that location. While few dispute that the direct cost of electricity from the currently available solar

Borenstein, Severin

2008-01-01T23:59:59.000Z

160

The cost of noise reduction in commercial tilt rotor aircraft  

E-Print Network [OSTI]

The relationship between direct operating cost and departure noise annoyance was developed for commercial tilt rotor aircraft. This was accomplished by generating a series of tilt rotor aircraft designs to meet various ...

Faulkner, Henry B.

1974-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Health Care Costs Associated with Violence in Pennsylvania 1994  

E-Print Network [OSTI]

Health Care Costs Associated with Violence in Pennsylvania 1994 March 2000 Health Services Research of violent events that occurred in Pennsylvania for the year 1994, and to estimate the health care costs, and domestic abuse; self-directed violence, including completed and attempted suicide; and violence involving

Songer, Thomas J.

162

DFMA Cost Estimates of Fuel-Cell/Reformer Systems  

E-Print Network [OSTI]

Page 1 DFMA Cost Estimates of Fuel-Cell/Reformer Systems at Low/Medium/High Production Rates Brian system · Direct hydrogen fuel cell system (with 5kpsi H2 storage) 2. Determine costs for system ·Fuel cell stacks ·Air supply and humidification ·Thermal management ·Water management ·Fuel Supply

163

Filtering Decomposable Global Cost Functions D. Allouche1  

E-Print Network [OSTI]

frameworks (Schiex, Fargier, and Ver- faillie 1995) federates a variety of famous problems includ- ing CSP to weighted CSP, defining Global Cost Func- tions (Zytnicki et al. 2009; Lee and Leung 2012) with asso- ciated- composition is essentially equivalent to a direct application on the original global cost function. Finally

Paris-Sud XI, Université de

164

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

165

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

166

Mandatory Photovoltaic System Cost Analysis  

Broader source: Energy.gov [DOE]

The Arizona Corporation Commission requires electric utilities to conduct a cost/benefit analysis to compare the cost of line extension with the cost of installing a stand-alone photovoltaic (PV)...

167

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

168

New fuel injector design lowers cost  

SciTech Connect (OSTI)

This article describes the Bendix Deka injector series. Bendix engineers have been striving to lessen costs of all portions of the injection equipment, especially single and multipoint injectors. Results of these efforts are advanced, thin-edged orifice and floating unitized armature designs. External configurations of both multipoint and single point Bendix Deka injectors are such that they can directly replace existing products. Both injector types are designed to be able to deliver any calibration within the currently-known requirements. Flow tolerances for Deka injectors match all known requirements, representing a good economic balance between performance and cost. Materials were carefully chosen for wear and corrosion resistance.

De Grace, L.G.; Bata, G.T.

1985-03-01T23:59:59.000Z

169

Construction Costs of Six Landfill Cover Designs  

SciTech Connect (OSTI)

A large-scale field demonstration comparing and contrasting final landfill cover designs has been constructed and is currently being monitored. Four alternative cover designs and two conventional designs (a RCRA Subtitle `D' Soil Cover and a RCRA Subtitle `C' Compacted Clay Cover) were constructed side-by-side for direct comparison. The demonstration is intended to evaluate the various cover designs based on their respective water balance performance, ease and reliability of construction, and cost. This paper provides an overview of the construction costs of each cover design.

Dwyer, S.F.

1998-12-23T23:59:59.000Z

170

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

171

Cost and Performance Assumptions for Modeling Electricity Generation Technologies  

SciTech Connect (OSTI)

The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

2010-11-01T23:59:59.000Z

172

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

173

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

. Equipment access charges Service contracts, running costs, materials and consumables and staff time

Rambaut, Andrew

174

Heliostat cost reduction study.  

SciTech Connect (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

175

Hay Harvesting Costs $$$$$ in Texas.  

E-Print Network [OSTI]

Hay is an important crop in Ta 1 Harvesting costs constitute the major5 pense of hay production in many M Mg and Wayne D . Taylor INTRODUCTION .................................................... 2 Fixed Costs or Ownership Costs... ............................................. 10 Totarl Cost .............................................................. 10 HAY HARVESTING ALTERNATIVES COMPARED ...................... 11 HOW TO MAKE WISE DECISIONS CONCERNING INVESTMENTS IN MACHINERY...

Long, James T.; Taylor, Wayne D.

1972-01-01T23:59:59.000Z

176

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION .............................................................................13 Definition of Levelized Cost ........................................................................................................13 Levelized Cost Components

177

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION............................................................ 3 Definition of Levelized Cost.................................................................................... 3 Levelized Cost Categories

Laughlin, Robert B.

178

International Environmental Agreements with Mixed Strategies and Investment  

E-Print Network [OSTI]

By incurring the investment cost ?, a country reduces thewelfare, exclusive of investment costs. Because Myerson (that invest incur the investment cost, all countries have

Hong, Fuhai; Karp, Larry

2012-01-01T23:59:59.000Z

179

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

180

Low cost subpixel method for vibration measurement  

SciTech Connect (OSTI)

Traditional vibration measurement methods are based on devices that acquire local data by direct contact (accelerometers, GPS) or by laser beams (Doppler vibrometers). Our proposal uses video processing to obtain the vibration frequency directly from the scene, without the need of auxiliary targets or devices. Our video-vibrometer can obtain the vibration frequency at any point in the scene and can be implemented with low-cost devices, such as commercial cameras. Here we present the underlying theory and some experiments that support our technique.

Ferrer, Belen [Department of Civil Engineering, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain); Espinosa, Julian; Perez, Jorge; Acevedo, Pablo; Mas, David [Inst. of Physics Applied to the Sciences and Technologies, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain); Roig, Ana B. [Department of Optics, Univ. Alicante P.O. Box, 99, 03080 Alicante (Spain)

2014-05-27T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Geothermal probabilistic cost study  

SciTech Connect (OSTI)

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

1981-08-01T23:59:59.000Z

182

Cost of documenting the NISC project.  

SciTech Connect (OSTI)

The project team selected a computer-based approach for the NISC project record management system. The team is convinced that this approach did cut direct costs . The major advantage, that the team believes did help the project, comes in the area of having just one central point for all design and construction information related to the project . The other benefit to the project will come over the thirty-year design life of the project through reduced costs to design changes to the facility . The team estimates that a reasonable saving for the project (including future modifications) will be about $2,OOOK or about 3% of the project construction costs . The cost increase of scanning non-electric documents will decrease for other projects in the future as more project related information is computer generated . Many the subcontractors on the NISC project had not completely converted to computer based systems for there own internal operation during the life of the NISC project. However, as more project related documents are generated in electronic form this type of cost will reduce .

Stutz, R. A. (Roger Alan)

2003-01-01T23:59:59.000Z

183

LIFE Cost of Electricity, Capital and Operating Costs  

SciTech Connect (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

184

Big Sky Trust Fund (Montana)  

Broader source: Energy.gov [DOE]

The Big Sky Trust Fund reimburses expenses incurred in the purchase, leasing, or relocation of real assets for direct use of the assisted business or employee training costs. A local or tribal...

185

LOW COST HEAT PUMP WATER HEATER (HPWH)  

SciTech Connect (OSTI)

Water heating accounts for the second largest portion of residential building energy consumption, after space conditioning. Existing HPWH products are a technical success, with demonstrated energy savings of 50% or more compared with standard electric resistance water heaters. However, current HPWHs available on the market cost an average of $1000 or more, which is too expensive for significant market penetration. What is needed is a method to reduce the first cost of HPWHs, so that the payback period will be reduced from 8 years to a period short enough for the market to accept this technology. A second problem with most existing HPWH products is the reliability issue associated with the pump and water loop needed to circulate cool water from the storage tank to the HPWH condenser. Existing integral HPWHs have the condenser wrapped around the water tank and thus avoid the pump and circulation issues but require a relatively complex and expensive manufacturing process. A more straightforward potentially less costly approach to the integral, single package HPWH design is to insert the condenser directly into the storage tank, or immersed direct heat exchanger (IDX). Initial development of an IDX HPWH met technical performance goals, achieving measured efficiencies or energy factors (EF) in excess of 1.79. In comparison conventional electric water heaters (EWH) have EFs of about 0.9. However, the initial approach required a 2.5" hole on top of the tank for insertion of the condenser - much larger than the standard openings typically provided. Interactions with water heater manufacturers indicated that the non standard hole size would likely lead to increased manufacturing costs (at least initially) and largely eliminate any cost advantage of the IDX approach. Recently we have been evaluating an approach to allow use of a standard tank hole size for insertion of the IDX condenser. Laboratory tests of a prototype have yielded an EF of 2.02.

Mei, Vince C [ORNL; Baxter, Van D [ORNL

2006-01-01T23:59:59.000Z

186

INDEPENDENT COST REVIEW (ICR)  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS Cable ProjectsHistoryia/802871 IA Blog|INDEPENDENT COST

187

Defining groundwater remediation objectives with cost-1 benefit analysis: does it work?2  

E-Print Network [OSTI]

/or decontamination are related to direct50 groundwater use. Benefits are often considered as avoided costs1 Defining groundwater remediation objectives with cost-1 benefit analysis: does it work?2 3 J.7 *Corresponding author (E-mail: jd.rinaudo@brgm.fr)8 9 Abstract10 The use of cost-benefit analysis

Paris-Sud XI, Université de

188

User cost in oil production  

E-Print Network [OSTI]

The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

Adelman, Morris Albert

1990-01-01T23:59:59.000Z

189

Wind Integration Cost and Cost-Causation: Preprint  

SciTech Connect (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

190

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

191

Cost Effectiveness NW Energy Coalition  

E-Print Network [OSTI]

1 Action 8 Cost Effectiveness Manual Kim Drury NW Energy Coalition Context · Inconsistent understanding of cost effectiveness contributed to under performing conservation E.g: individual measures vs Action Plan for Energy Efficiency published a comprehensive guide on cost effectiveness: best practices

192

Processing Cost Analysis for Biomass Feedstocks  

SciTech Connect (OSTI)

The receiving, handling, storing, and processing of woody biomass feedstocks is an overlooked component of biopower systems. The purpose of this study was twofold: (1) to identify and characterize all the receiving, handling, storing, and processing steps required to make woody biomass feedstocks suitable for use in direct combustion and gasification applications, including small modular biopower (SMB) systems, and (2) to estimate the capital and operating costs at each step. Since biopower applications can be varied, a number of conversion systems and feedstocks required evaluation. In addition to limiting this study to woody biomass feedstocks, the boundaries of this study were from the power plant gate to the feedstock entry point into the conversion device. Although some power plants are sited at a source of wood waste fuel, it was assumed for this study that all wood waste would be brought to the power plant site. This study was also confined to the following three feedstocks (1) forest residues, (2) industrial mill residues, and (3) urban wood residues. Additionally, the study was confined to grate, suspension, and fluidized bed direct combustion systems; gasification systems; and SMB conversion systems. Since scale can play an important role in types of equipment, operational requirements, and capital and operational costs, this study examined these factors for the following direct combustion and gasification system size ranges: 50, 20, 5, and 1 MWe. The scope of the study also included: Specific operational issues associated with specific feedstocks (e.g., bark and problems with bridging); Opportunities for reducing handling, storage, and processing costs; How environmental restrictions can affect handling and processing costs (e.g., noise, commingling of treated wood or non-wood materials, emissions, and runoff); and Feedstock quality issues and/or requirements (e.g., moisture, particle size, presence of non-wood materials). The study found that over the years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

Badger, P.C.

2002-11-20T23:59:59.000Z

193

COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement that is not bourn by  

E-Print Network [OSTI]

1 COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement. There are primarily three types of cost sharing that may occur on sponsored projects: Mandatory cost sharing. For example, the National Science Foundation requires mandatory cost sharing for some of its projects. COST

Cui, Yan

194

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

195

Directives Help - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directives Help by Website Administrator All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a...

196

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

197

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

198

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

Subject An Examination of Avoided Costs in Utah Date Januarystate by seeking changes to the avoided cost tariff paid tomethod of calculating avoided costs that has been officially

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

199

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Fueling stations; Cost; Shanghai; Fuel cell vehicles 1.and the delivery cost for fuel cell vehicles, however, itthus hydrogen cost therefore depend on the ?eet of fuel cell

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

200

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

production and conversion parameters must be optimized. Lower cost fiber enable CF composite applications. Approach: 1. Complete previous effort by scaling to the CF production...

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

performing fiber. (600-750 KSI) Barriers: Addresses the need for higher performance low cost fiber for hydrogen storage tanks and energy management structures of automobiles....

202

HTGR Cost Model Users' Manual  

SciTech Connect (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

203

Energy Efficiency Improvement and Cost Saving Opportunities for the Pharmaceutical Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

the effects of low refrigerant charge. The cost of automatedby applying this measure. Monitoring of refrigerant charge.A low refrigerant charge can exist in many small direct

Galitsky, Christina

2008-01-01T23:59:59.000Z

204

Departmental Directives Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order is the primary directive for administering the Department's directives Program. Cancels: DOE O 251.1A

2006-08-16T23:59:59.000Z

205

Hydrogen Compression, Storage, and Dispensing Cost Reduction...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Document states additional...

206

5, 14791509, 2008 Staged cost  

E-Print Network [OSTI]

HESSD 5, 1479­1509, 2008 Staged cost optimization of urban storm drainage systems M. Maharjan et al Staged cost optimization of urban storm drainage systems based on hydraulic performance in a changing optimization of urban storm drainage systems M. Maharjan et al. Title Page Abstract Introduction Conclusions

Boyer, Edmond

207

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z

208

LowerLower--Cost Fuel CellsCost Fuel Cells Allen J. Bard, Arumugam Manthiram,Allen J. Bard, Arumugam Manthiram,  

E-Print Network [OSTI]

density 4 Hydrogen polymer electrolyteHydrogen polymer electrolyte membrane fuel cell (PEMFC)membrane fuel1 LowerLower--Cost Fuel CellsCost Fuel Cells Allen J. Bard, Arumugam Manthiram,Allen J. BardMaterials Science and Engineering Program 2 CONVENTIONAL POWER PLANT DIRECT FUEL CELL POWER PLANT Heat

Lightsey, Glenn

209

Control strategy for hydrocarbon emissions in turbocharged direct injection spark ignition engines during cold-start  

E-Print Network [OSTI]

Gasoline consumption and pollutant emissions from transportation are costly and have serious, demonstrated environmental and health impacts. Downsized, turbocharged direct-injection spark ignition (DISI) gasoline engines ...

Cedrone, Kevin David

2013-01-01T23:59:59.000Z

210

OM300 Direction Drilling Module  

SciTech Connect (OSTI)

OM300 – Geothermal Direction Drilling Navigation Tool: Design and produce a prototype directional drilling navigation tool capable of high temperature operation in geothermal drilling Accuracies of 0.1° Inclination and Tool Face, 0.5° Azimuth Environmental Ruggedness typical of existing oil/gas drilling Multiple Selectable Sensor Ranges High accuracy for navigation, low bandwidth High G-range & bandwidth for Stick-Slip and Chirp detection Selectable serial data communications Reduce cost of drilling in high temperature Geothermal reservoirs Innovative aspects of project Honeywell MEMS* Vibrating Beam Accelerometers (VBA) APS Flux-gate Magnetometers Honeywell Silicon-On-Insulator (SOI) High-temperature electronics Rugged High-temperature capable package and assembly process

MacGugan, Doug

2013-08-22T23:59:59.000Z

211

Cost of meeting geothermal liquid effluent disposal regulations  

SciTech Connect (OSTI)

Background information is presented on the characteristics of liquid wastes and the available disposal options. Regulations that may directly or indirectly influence liquid waste disposal are reviewed. An assessment of the available wastewater-treatment systems is provided. A case study of expected liquid-waste-treatment and disposal costs is summarized. (MHR)

Wells, K.D.; Currie, J.W.; Price, B.A.; Rogers, E.A.

1981-06-01T23:59:59.000Z

212

User's manual for the INDCEPT code for estimating industrial steam boiler plant capital investment costs  

SciTech Connect (OSTI)

The INDCEPT computer code package was developed to provide conceptual capital investment cost estimates for single- and multiple-unit industrial steam boiler plants. Cost estimates can be made as a function of boiler type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs. Boiler plant cost models are provided to reflect various types and sources of coal and alternate means of sulfur and particulate removal. Cost models are also included for low-Btu and medium-Btu gas produced in coal gasification plants.

Bowers, H I; Fuller, L C; Hudson, II, C R

1982-09-01T23:59:59.000Z

213

Incentive Rates- At What Cost?  

E-Print Network [OSTI]

with interruptible services. Instead, I filed "ISB" which was priced slightly above the marginal fuel cost on a time of use basis. Many of the periods of the year the first year that I proposed that rate, the cost of interruptible would have been higher than... forms centers on four issues; cost scope of the topic, so let me describe what I feel based pricing, discrimination, competition between is an incentive rate. My view is likely to strike utilities, and effectiveness. You've already some of you...

Schaeffer, S. C.

214

Sandia National Laboratories: Water Availability, Cost, and Use  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InterconnectsWater Availability, Cost, and Use Water Availability, Cost, and Use Water Availability, Cost, and Use Water Availability, Cost, and Use Availability, cost, and...

215

Electricity transmission congestion costs: A review of recent reports  

SciTech Connect (OSTI)

Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-10-01T23:59:59.000Z

216

Cost-Effective Cable Insulation: Nanoclay Reinforced Ethylene-Propylene-Rubber for Low-Cost HVDC Cabling  

SciTech Connect (OSTI)

GENI Project: GE is developing new, low-cost insulation for high-voltage direct current (HVDC) electricity transmission cables. The current material used to insulate HVDC transmission cables is very expensive and can account for as much as 1/3 of the total cost of a high-voltage transmission system. GE is embedding nanomaterials into specialty rubber to create its insulation. Not only are these materials less expensive than those used in conventional HVDC insulation, but also they will help suppress excess charge accumulation. The excess charge left behind on a cable poses a major challenge for high-voltage insulation—if it’s not kept to a low level, it could ultimately lead the insulation to fail. GE’s low-cost insulation is compatible with existing U.S. cable manufacturing processes, further enhancing its cost effectiveness.

None

2012-02-24T23:59:59.000Z

217

Variation of direct-heat geothermal economics with project size  

SciTech Connect (OSTI)

A comparision of the economics of large, intermediate, and small direct-heat goethermal projects is presented. An attempt is made to define which types of direct-heat geothermal projects are most cost-efficient and produce the most energy for the least amount of money. The potential energy contribution of fourteen different sizes of direct heat projects is used to determine the number of projects of a given size required to produce 1 Quad of energy. The cost of developing 1 Quad of direct-heat geothermal energy from large, intermediate, and small projects is compared to the cost of 1 Quad of energy from conventional sources. The engineering and resource parameters controlling project size are defined. The development of large-scale projects is stressed as the way in which direct-heat geothermal energy can make the most significant contribution to the nation's energy requirements. (MJF)

Struhsacker, D.W.

1981-10-01T23:59:59.000Z

218

Mandatory Photovoltaic System Cost Estimate  

Broader source: Energy.gov [DOE]

At the request of a customer or a potential customer, Colorado electric utilities are required to conduct a cost comparison of a photovoltaic (PV) system to any proposed distribution line extension...

219

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

1 Lower Cost Carbon Fiber Precursors P.I. Name: Dave Warren Presenter: Dr. Amit K. Naskar Oak Ridge National Laboratory 05162012 Project ID LM004 This presentation does not...

220

Directives Quarterly Updates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Listings of new Justification Memoranda and new or revised Directives that have been posted to the DOE Directives, Delegations, and Requirements Portal. Updated quarterly.

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Another face of DIRECT  

E-Print Network [OSTI]

authors, see for example, tree-Direct [5]. This paper ..... [4] J.M. Gablonsky, Modifications of the DIRECT Algorithm, Ph.D. Thesis, North Carolina State. University ...

chiter

2007-08-01T23:59:59.000Z

222

Letting The Sun Shine On Solar Costs: An Empirical Investigation Of Photovoltaic Cost Trends In California  

E-Print Network [OSTI]

INVESTIGATION OF PHOTOVOLTAIC COST TRENDS IN CALIFORNIA RyanInvestigation of Photovoltaic Cost Trends in California”,cost of customer-sited, grid-connected solar photovoltaic (

Wiser, Ryan; Bolinger, Mark; Cappers, Peter; Margolis, Robert

2006-01-01T23:59:59.000Z

223

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

and simple cycle costs are the result of a comprehensive survey of actual costs from the power plant developers in California who built power plants between 2001 and 2006. The other costs are based on actual in conjunction with the variable cost information of a production cost market simulation model to produce

224

Sponsored Project Account Cost Transfer Explanation  

E-Print Network [OSTI]

Sponsored Project Account Cost Transfer Explanation Check-Off List December 2011 The explanations checked below best describe the reasons for why the cost transfers are being made. Costs as to how to allocate the cost, temporarily assigned the cost to an existing account that acted

He, Chuan

225

Conservation Cost-Effectiveness Determination Methodology  

E-Print Network [OSTI]

the levelized cost of the aggregate supply curves, the portfolio model does not evaluate each measure's specific of programming constraints, the levelized costs of conservation used in the portfolio model are not adjusted of its costs. May 2005 E-1 #12;include energy and capacity cost savings, local distribution cost savings

226

NUCLEAR ENERGY SYSTEM COST MODELING  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an island’s cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

Francesco Ganda; Brent Dixon

2012-09-01T23:59:59.000Z

227

The cost of noise reduction for departure and arrival operations of commercial tilt rotor aircraft  

E-Print Network [OSTI]

The relationship between direct operating cost (DOC) and noise annoyance due to a departure and an arrival operation was developed for commercial tilt rotor aircraft. This was accomplished by generating a series of tilt ...

Faulkner, Henry B.

1976-01-01T23:59:59.000Z

228

Novel Low Cost, High Reliability Wind Turbine Drivetrain  

SciTech Connect (OSTI)

Clipper Windpower, in collaboration with United Technologies Research Center, the National Renewable Energy Laboratory, and Hamilton Sundstrand Corporation, developed a low-cost, deflection-compliant, reliable, and serviceable chain drive speed increaser. This chain and sprocket drivetrain design offers significant breakthroughs in the areas of cost and serviceability and addresses the key challenges of current geared and direct-drive systems. The use of gearboxes has proven to be challenging; the large torques and bending loads associated with use in large multi-MW wind applications have generally limited demonstrated lifetime to 8-10 years [1]. The large cost of gearbox replacement and the required use of large, expensive cranes can result in gearbox replacement costs on the order of $1M, representing a significant impact to overall cost of energy (COE). Direct-drive machines eliminate the gearbox, thereby targeting increased reliability and reduced life-cycle cost. However, the slow rotational speeds require very large and costly generators, which also typically have an undesirable dependence on expensive rare-earth magnet materials and large structural penalties for precise air gap control. The cost of rare-earth materials has increased 20X in the last 8 years representing a key risk to ever realizing the promised cost of energy reductions from direct-drive generators. A common challenge to both geared and direct drive architectures is a limited ability to manage input shaft deflections. The proposed Clipper drivetrain is deflection-compliant, insulating later drivetrain stages and generators from off-axis loads. The system is modular, allowing for all key parts to be removed and replaced without the use of a high capacity crane. Finally, the technology modularity allows for scalability and many possible drivetrain topologies. These benefits enable reductions in drivetrain capital cost by 10.0%, levelized replacement and O&M costs by 26.7%, and overall cost of energy by 10.2%. This design was achieved by: (1) performing an extensive optimization study that deter-mined the preliminary cost for all practical chain drive topologies to ensure the most competitive configuration; (2) conducting detailed analysis of chain dynamics, contact stresses, and wear and efficiency characteristics over the chain�������¢����������������s life to ensure accurate physics-based predictions of chain performance; and (3) developing a final product design, including reliability analysis, chain replacement procedures, and bearing and sprocket analysis. Definition of this final product configuration was used to develop refined cost of energy estimates. Finally, key system risks for the chain drive were defined and a comprehensive risk reduction plan was created for execution in Phase 2.

Anthony Chobot; Debarshi Das; Tyler Mayer; Zach Markey; Tim Martinson; Hayden Reeve; Paul Attridge; Tahany El-Wardany

2012-09-13T23:59:59.000Z

229

The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report are  

E-Print Network [OSTI]

The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report significantly over time. Budgets for alfalfa hay establishment with an oat companion crop and by direct seeding are included in this publication. Annual production costs for established alfalfa or alfalfa-grass hay as well

Duffy, Michael D.

230

Analysis of the costs of a backlog project in response to recommendation 2 of the  

E-Print Network [OSTI]

and growing. Because much of this material was directly transferred to off-site storage, the provenance and contents are a mystery. The costs of off-site storage, lack of knowledge of the contents, and the impending to off-site storage, the provenance and contents are a mystery. The costs of off-site storage, lack

Wechsler, Risa H.

231

RaisingRivals'FixedCosts Matthew Olczak  

E-Print Network [OSTI]

. In addition much of the recent Industrial Organisation literature has focused on the importance of sunk costs, whereas this paper considers fixed costs that do not have to be sunk costs. A set of guidelines produced

Feigon, Brooke

232

USA oilgas production cost : recent changes  

E-Print Network [OSTI]

During 1984-1989, oil development investment cost in the USA fell, but only because of lower activity. The whole cost curve shifted unfavorably (leftward). In contrast, natural gas cost substantially decreased, the curve ...

Adelman, Morris Albert

1991-01-01T23:59:59.000Z

233

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

and the delivery cost for fuel cell vehicles, however, itfueling stations, cost, Shanghai, fuel cell vehicles 1.0hydrogen cost therefore depend on the fleet of fuel cell

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

234

Designing for cost In an aerospace company  

E-Print Network [OSTI]

Companies take different approaches, and achieve different degrees of implementation, in designing products for cost. This thesis discusses Target Costing and its application at The Boeing Company. Target Costing is a ...

Hammar, Elizabeth (Elizabeth Deming)

2014-01-01T23:59:59.000Z

235

Plant Energy Cost Optimization Program (PECOP)  

E-Print Network [OSTI]

The Plant Energy Cost Optimization Program (PECOP) is a Management System designed to reduce operating cost in a continuous operating multi product plant by reviewing all cost factors and selecting plant wide production schedules which are most...

Robinson, A. M.

1980-01-01T23:59:59.000Z

236

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

to hydrogen storage vessels and compressors. Feedstock CostHydrogen Production Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costshydrogen equipment costs. Meyers [2] provides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

237

 Underfloor air distribution (UFAD) cost study: analysis of first cost tradeoffs in UFAD systems  

E-Print Network [OSTI]

Thermal Quality: Total HVAC Cost Trend Table 5. Wall Thermal20. Climate: Total HVAC Cost Trend HVAC Category Cost ($/the total perimeter HVAC cost trend for increased density of

Webster, Tom; Benedek, Corinne; Bauman, Fred

2006-01-01T23:59:59.000Z

238

Low cost titanium--myth or reality  

SciTech Connect (OSTI)

In 1998, approximately 57,000 tons of titanium metal was consumed in the form of mill products (1). Only about 5% of the 4 million tons of titanium minerals consumed each year is used to produce titanium metal, with the remainder primarily used to produce titanium dioxide pigment. Titanium metal production is primarily based on the direct chlorination of rutile to produce titanium tetrachloride, which is then reduced to metal using the Kroll magnesium reduction process. The use of titanium is tied to its high strength-to-weight ratio and corrosion resistance. Aerospace is the largest application for titanium, and titanium cost has prevented its use in non-aerospace applications including the automotive and heavy vehicle industries.

Turner, Paul C.; Hartman, Alan D.; Hansen, Jeffrey S.; Gerdemann, Stephen J.

2001-01-01T23:59:59.000Z

239

Cost Analysis of Hydrogen Storage Systems  

Broader source: Energy.gov (indexed) [DOE]

Results - Do Not Cite Hydrogen Storage Sodium Alanate Bottom-up BOP Cost DFMA software is used to estimate balance of plant (BOP) component costs based on material,...

240

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

pieces of hardware: 1. Hydrogen production equipment (e.g.when evaluating hydrogen production costs. Many analyses inrespect to size and hydrogen production method. These costs

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Driltac (Drilling Time and Cost Evaluation)  

SciTech Connect (OSTI)

The users manual for the drill tech model for estimating the costs of geothermal wells. The report indicates lots of technical and cost detail. [DJE-2005

None

1986-08-01T23:59:59.000Z

242

Example Cost Codes for Construction Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

243

Hydrogen Production Cost Estimate Using Biomass Gasification...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Production Cost Estimate Using Biomass Gasification: Independent Review Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review This independent review is...

244

Technology Improvement Pathways to Cost-Effective Vehicle Electrification  

SciTech Connect (OSTI)

Electrifying transportation can reduce or eliminate dependence on foreign fuels, emission of green house gases, and emission of pollutants. One challenge is finding a pathway for vehicles that gains wide market acceptance to achieve a meaningful benefit. This paper evaluates several approaches aimed at making plug-in electric vehicles (EV) and plug-in hybrid electric vehicles (PHEVs) cost-effective including opportunity charging, replacing the battery over the vehicle life, improving battery life, reducing battery cost, and providing electric power directly to the vehicle during a portion of its travel. Many combinations of PHEV electric range and battery power are included. For each case, the model accounts for battery cycle life and the national distribution of driving distances to size the battery optimally. Using the current estimates of battery life and cost, only the dynamically plugged-in pathway was cost-effective to the consumer. Significant improvements in battery life and battery cost also made PHEVs more cost-effective than today's hybrid electric vehicles (HEVs) and conventional internal combustion engine vehicles (CVs).

Brooker, A.; Thornton, M.; Rugh, J. P.

2010-04-01T23:59:59.000Z

245

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network [OSTI]

to bond with composite matrix material. It is important that a carbon fiber manufacturing cost model manufactured with carbon fiber as opposed to traditional materials such as steel, automotive parts are able associated with both the manufacture of carbon fibers themselves as well as their composites. Traditional

246

Cost-Causation and Integration Cost Analysis for Variable Generation  

SciTech Connect (OSTI)

This report examines how wind and solar integration studies have evolved, what analysis techniques work, what common mistakes are still made, what improvements are likely to be made in the near future, and why calculating integration costs is such a difficult problem and should be undertaken carefully, if at all.

Milligan, M.; Ela, E.; Hodge, B. M.; Kirby, B.; Lew, D.; Clark, C.; DeCesaro, J.; Lynn, K.

2011-06-01T23:59:59.000Z

247

Directives Quarterly Updates - DOE Directives, Delegations, and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: https://www.directives.doe.gov/directives/directives

248

MANUFACTURING AND COST EVALUATION OF SECOND GENERATION HELIOSTATS VOLUME I - ANALYSIS AND RESULTS  

SciTech Connect (OSTI)

The Second Generation Heliostat Program involved five contractors who provided designs, manufacturing plans, and cost estimates for heliostats. The program was sponsored by the Department of Energy and managed by Sandia National Laboratories, Livermore. As part of the program, Pacific Northwest Laboratory (PNL) evaluated and compared the contractors' costs and production plans, and compared the actual costs of the Solar One (Barstow, California) pilot-plant heliostats to estimated mass production costs. One purpose of this review was to adjust contractor estimates to provide a common basis for cost comparisons. The five contractors were: Boeing Engineering and Construction, Martin Marietta Corporation, McDonnell Douglas Astronautics Company, Northrup Incorporated, and Westinghouse Electric Corporation. PNL evaluated the components and assembly of the five heliostats in terms of material, direct labor, production equipment, production building requirements, and overheads. Two adjustments were made to the costs estimated by the manufacturers. The first, producing "Adjusted Costs," was primarily to add items that appeared to have been omitted from the contractors' estimates or delete items that were not required. The second, called "Uniform Assumptions Costs," used common ground rules for major materials, building, labor, and overhead costs. The review of the contractors' production plans and cost estimates did not reveal any errors or omissions that would change the costs by more than 30%, when compared using uniform assumptions. This range is adequate for policy planning, and costs of $100/m{sup 2} appear achievable.

Drumheller,, K.; Bondurant,, P. D.; Brown,, D. R.; Williams,, T. A.

1981-09-01T23:59:59.000Z

249

Data Caching in Networks with Reading, Writing and Storage Costs  

E-Print Network [OSTI]

and bandwidth/energy usage. However, caching in too many nodes can take up too much memory, incur extensive. For the general graph topology, where the problem is NP-complete, we present a centralized heuristic which graphs, we show that the centralized heuristic performs very close to the exponential optimal algorithm

Gupta, Himanshu

250

Costs of Land Subsidence Due to Groundwater Withdrawal  

E-Print Network [OSTI]

total. Of the $109.6 million, $53.2 million were incurred in 1973, principally due to a six foot tide. Probability of the occurrence of a six foot tide in any one year is 20 percent. Given five additional feet of subsidence in the study area...

Warren, J. P.; Jones, L. L.; Griffin, W. L.; Lacewell, R. D.

251

CENTER FOR FISCAL POLICY Mortgage Amortization and Amplification  

E-Print Network [OSTI]

to the second period having incurred small sunk costs. Keywords: Housing; Mortgage default; Mortgage risk JEL

252

Geothermal direct use engineering and design guidebook  

SciTech Connect (OSTI)

The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of these resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse, aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental considerations. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very potential in the United States.

Bloomquist, R.G.; Culver, G.; Ellis, P.F.; Higbee, C.; Kindle, C.; Lienau, P.J.; Lunis, B.C.; Rafferty, K.; Stiger, S.; Wright, P.M.

1989-03-01T23:59:59.000Z

253

Geothermal direct use engineering and design guidebook  

SciTech Connect (OSTI)

The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating and cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of the resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental consideration. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very large potential in the United States.

Lienau, P.J.; Lunis, B.C. (eds.)

1991-01-01T23:59:59.000Z

254

Market Equilibrium with Transaction Costs  

E-Print Network [OSTI]

Identical products being sold at different prices in different locations is a common phenomenon. Price differences might occur due to various reasons such as shipping costs, trade restrictions and price discrimination. We give a way to model such scenarios by supplementing the classical Fisher model of a market by introducing {\\em transaction costs}. For every buyer $i$ and every good $j$, there is a transaction cost of $\\cij$; if the price of good $j$ is $p_j$, then the cost to the buyer $i$ {\\em per unit} of $j$ is $p_j + \\cij$. This allows the same good to be sold at different (effective) prices to different buyers. We study questions regarding existence, uniqueness and computability of equilibrium in such a model. Our results can be summarized as such: The convex program of \\cite{Dev09} can be generalized to prove existence and uniqueness of equilibrium. We also provide a combinatorial algorithm that computes $\\epsilon$-approximate equilibrium prices and allocations in $O(\\frac{1}{\\epsilon}(n+\\log{m})mn\\l...

Chakraborty, Sourav; Karande, Chinmay

2010-01-01T23:59:59.000Z

255

Wind Electrolysis: Hydrogen Cost Optimization  

SciTech Connect (OSTI)

This report describes a hydrogen production cost analysis of a collection of optimized central wind based water electrolysis production facilities. The basic modeled wind electrolysis facility includes a number of low temperature electrolyzers and a co-located wind farm encompassing a number of 3MW wind turbines that provide electricity for the electrolyzer units.

Saur, G.; Ramsden, T.

2011-05-01T23:59:59.000Z

256

Examples of Cost Estimation Packages  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

1997-03-28T23:59:59.000Z

257

Pollution prevention cost savings potential  

SciTech Connect (OSTI)

The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

Celeste, J.

1994-12-01T23:59:59.000Z

258

Direct Loan Program (Connecticut)  

Broader source: Energy.gov [DOE]

The Connecticut Development Authority’s Direct Loan Program provides direct senior and subordinated loans and mezzanine investments to companies creating or maintaining jobs. Up to $20,000 per job...

259

Directives System Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 251.1A, Directives System, dated 1-30-98.

1998-01-30T23:59:59.000Z

260

Direct process for explosives  

DOE Patents [OSTI]

A direct process of making ethylenediamine dinitrate through the reaction of ethylenediamine and ammonium nitrate is described.

Akst, I.B.; Stinecipher, M.M.

1982-10-12T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DEVELOPMENT AND MANUFACTURE OF COST EFFECTIVE COMPOSITE DRILL PIPE  

SciTech Connect (OSTI)

This technical report presents the engineering research, process development and data accomplishments that have transpired to date in support of the development of Cost Effective Composite Drill Pipe (CDP). The report presents progress made from October 1, 2003 through September 30, 2004 and contains the following discussions: (1) Direct Electrical Connection for Rotary Shoulder Tool Joints; (2) Conductors for inclusion in the pipe wall (ER/DW-CDP); (3) Qualify fibers from Zoltek; (4) Qualify resin from Bakelite; (5) First commercial order for SR-CDP from Integrated Directional Resources (SR-CDP); and (6) Preparation of papers for publication and conference presentations.

James C. Leslie; James C. Leslie II; Lee Truong; James T. Heard; Peter Manekas

2005-03-18T23:59:59.000Z

262

Directives Templates - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct:Directives Templates by Website Administrator Directives

263

Supplemental report on cost estimates'  

SciTech Connect (OSTI)

The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

NONE

1992-04-29T23:59:59.000Z

264

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

. These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

265

Low Cost Hydrogen Production Platform  

SciTech Connect (OSTI)

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

Timothy M. Aaron, Jerome T. Jankowiak

2009-10-16T23:59:59.000Z

266

Urologic robots and future directions  

E-Print Network [OSTI]

PURPOSE OF REVIEW: Robot-assisted laparoscopic surgery in urology has gained immense popularity with the daVinci system, but a lot of research teams are working on new robots. The purpose of this study is to review current urologic robots and present future development directions. RECENT FINDINGS: Future systems are expected to advance in two directions: improvements of remote manipulation robots and developments of image-guided robots. SUMMARY: The final goal of robots is to allow safer and more homogeneous outcomes with less variability of surgeon performance, as well as new tools to perform tasks on the basis of medical transcutaneous imaging, in a less invasive way, at lower costs. It is expected that improvements for a remote system could be augmented in reality, with haptic feedback, size reduction, and development of new tools for natural orifice translumenal endoscopic surgery. The paradigm of image-guided robots is close to clinical availability and the most advanced robots are presented with end-use...

Mozer, Pierre; Stoianovici, Dan; 10.1097/MOU.0b013e32831cc1ba

2008-01-01T23:59:59.000Z

267

ANALYSIS OF THE PERFORMANCE AND COST EFFECTIVENESS OF NINE SMALL WIND ENERGY CONVERSION SYSTEMS FUNDED BY THE DOE SMALL GRANTS PROGRAM  

E-Print Network [OSTI]

make direct contact with a utility line. able to connecta single phase or 3-phase utility line. Direct connectioneffective cost. when a utility line could not be extended at

Kay, J.

2009-01-01T23:59:59.000Z

268

Rebalancing an Investment Portfolio in the Presence of Convex Transaction Costs and Market Impact Costs  

E-Print Network [OSTI]

Rebalancing an Investment Portfolio in the Presence of Convex Transaction Costs and Market Impact transaction costs. The loss to a portfolio from market impact costs is typically modeled with a convex, transaction costs, market impact costs, rebalanc- ing, conic optimization, convex optimization. 1 #12

Mitchell, John E.

269

Costs of U.S. Oil Dependence: 2005 Update  

SciTech Connect (OSTI)

For thirty years, dependence on oil has been a significant problem for the United States. Oil dependence is not simply a matter of how much oil we import. It is a syndrome, a combination of the vulnerability of the U.S. economy to higher oil prices and oil price shocks and a concentration of world oil supplies in a small group of oil producing states that are willing and able to use their market power to influence world oil prices. Although there are vitally important political and military dimensions to the oil dependence problem, this report focuses on its direct economic costs. These costs are the transfer of wealth from the United States to oil producing countries, the loss of economic potential due to oil prices elevated above competitive market levels, and disruption costs caused by sudden and large oil price movements. Several enhancements have been made to methods used in past studies to estimate these costs, and estimates of key parameters have been updated based on the most recent literature. It is estimated that oil dependence has cost the U.S. economy $3.6 trillion (constant 2000 dollars) since 1970, with the bulk of the losses occurring between 1979 and 1986. However, if oil prices in 2005 average $35-$45/bbl, as recently predicted by the U.S. Energy Information Administration, oil dependence costs in 2005 will be in the range of $150-$250 billion. Costs are relatively evenly divided between the three components. A sensitivity analysis reflecting uncertainty about all the key parameters required to estimate oil dependence costs suggests that a reasonable range of uncertainty for the total costs of U.S. oil dependence over the past 30 years is $2-$6 trillion (constant 2000 dollars). Reckoned in terms of present value using a discount rate of 4.5%, the costs of U.S. oil dependence since 1970 are $8 trillion, with a reasonable range of uncertainty of $5 to $13 trillion.

Greene, D.L.

2005-03-08T23:59:59.000Z

270

Directives System Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 251.1, which establishes requirements for the development, coordination, and sunset review of DOE directives.

1995-10-16T23:59:59.000Z

271

Departmental Directives Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish directives as the primary means to set, communicate, and institutionalize policies, requirements, responsibilities, and procedures for Departmental elements and contractors.

2014-10-16T23:59:59.000Z

272

Direct Loan Program (Kentucky)  

Broader source: Energy.gov [DOE]

The Direct Loan Program, is designed to allow businesses to obtain the long term financing needed to encourage growth. The Kentucky Economic Development Finance Authority (KEDFA) may participate...

273

Evaluating cost-reduction alternatives and low-cost sourcing opportunities for aerospace castings and forgings  

E-Print Network [OSTI]

As companies continue to outsource large portions of their manufacturing, managing costs in the supply chain is increasingly important in reducing overall costs and remaining competitive. Low-cost sourcing has become an ...

Obermoller, Amber J

2008-01-01T23:59:59.000Z

274

Cost effectiveness of sonic drilling  

SciTech Connect (OSTI)

Sonic drilling (combination of mechanical vibrations and rotary power) is an innovative environmental technology being developed in cooperation with DOE`s Arid-Site Volatile Organic Compounds Integrated Demonstration at Hanford and the Mixed Waste Landfill Integrated Demonstration at Sandia. This report studies the cost effectiveness of sonic drilling compared with cable-tool and mud rotary drilling. Benefit of sonic drilling is its ability to drill in all types of formations without introducing a circulating medium, thus producing little secondary waste at hazardous sites. Progress has been made in addressing the early problems of failures and downtime.

Masten, D.; Booth, S.R.

1996-03-01T23:59:59.000Z

275

1998 Cost and Quality Annual  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve3. LightingImports Building7.p e u u8)

276

COST AND QUALITY TABLES 95  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquidsYearReservesm 3 (D CD ^ Q) r* o' 3 a 3

277

Low Cost Non-Reactive  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration - Rocky MountainPrepared: 10/28/09 Low Cost

278

Updating MIT's cost estimation model for shipbuilding  

E-Print Network [OSTI]

This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can ...

Smith, Matthew B., Lieutenant, junior grade

2008-01-01T23:59:59.000Z

279

Cost of Offshore Wind Energy Charlene Nalubega  

E-Print Network [OSTI]

Cost of Offshore Wind Energy and Industrial Engineering The focus of my research is to estimate the cost of floating offshore wind turbines water as well as on land based wind farms. The specific offshore wind energy case under consideration

Mountziaris, T. J.

280

Low-Cost Installation of Concentrating Photovoltaic  

E-Print Network [OSTI]

Low-Cost Installation of Concentrating Photovoltaic Renewable Energy Research Renewable Energy inhibit the potential growth of the California photovoltaic market: high installation costs, expenses improvements have been made in recent years on the assembly and deployment of flatplate photovoltaic

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Costs Associated With Propane Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

Smith, M.; Gonzales, J.

2014-08-01T23:59:59.000Z

282

2010 Cost of Wind Energy Review  

SciTech Connect (OSTI)

This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

2012-04-01T23:59:59.000Z

283

How to Reduce Energy Supply Costs  

E-Print Network [OSTI]

Rising energy costs have many businesses looking for creative ways to reduce their energy usage and lower the costs of energy delivered to their facilities. This paper explores innovative renewable and alternative energy technologies that can help...

Swanson, G.

2007-01-01T23:59:59.000Z

284

Breaking the Fuel Cell Cost Barrier  

Broader source: Energy.gov (indexed) [DOE]

the Fuel Cell Cost Barrier AMFC Workshop May 8 th , 2011, Arlington, VA Shimshon Gottesfeld, CTO The Fuel Cell Cost Challenge 2 CellEra's goal - achieve price parity with...

285

Sunk Costs and Real Options in Antitrust  

E-Print Network [OSTI]

Sunk costs play a central role in antitrust economics, but are often misunderstood and mismeasured. I will try to clarify some of the conceptual and empirical issues related to sunk costs, and explain their implications ...

Pindyck, Robert S.

2005-07-29T23:59:59.000Z

286

Cost Principles Webinar for DOE Grant Recipients  

Broader source: Energy.gov [DOE]

The Office of Management and Budget (OMB) Cost Principles in the Code of Federal Regulations (CFR) define, by organization type, what kinds of costs are allowable or unallowable for reimbursement...

287

How Much Does That Incinerator Cost?  

E-Print Network [OSTI]

Biosecurity on poultry farms includes proper disposal of dead carcasses. In many cases, that means using an incinerator. Calculating the cost of an incinerator means considering long and short-term expenses and the cost of fuel. This publication...

Mukhtar, Saqib; Nash, Catherine; Harman, Wyatte; Padia, Reema

2008-07-25T23:59:59.000Z

288

Life Cycle Cost Analysis for Sustainable Buildings  

Broader source: Energy.gov [DOE]

To help facility managers make sound decisions, FEMP provides guidance and resources on applying life cycle cost analysis (LCCA) to evaluate the cost-effectiveness of energy and water efficiency investments.

289

A Manager's Approach to Energy Cost Management  

E-Print Network [OSTI]

A major responsibility of management is the control and containment of operating costs. Energy costs are a major portion of the industrial budget. GM has developed a 3 phase approach to energy conservation. Phase I -Administrative Controls...

Spencer, R. J.

290

Hydrogen Production Cost Estimate Using Biomass Gasification  

E-Print Network [OSTI]

Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory% postconsumer waste #12;i Independent Review Panel Summary Report September 28, 2011 From: Independent Review Panel, Hydrogen Production Cost Estimate Using Biomass Gasification To: Mr. Mark Ruth, NREL, DOE

291

Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs  

E-Print Network [OSTI]

future estimates of hydrogen pipelines. Construction Cost (does this mean for hydrogen pipelines? The objective of thisinto the cost of hydrogen pipelines. To this end I will

Parker, Nathan

2004-01-01T23:59:59.000Z

292

Departmental Directives System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes the directives system to be used for publishing permanent and temporary directives issued by DOE Headquarters and addressed to Headquarters and/or field elements. Chg 1 dated 3-14-85. Cancels DOE 1321.1A.

1983-04-07T23:59:59.000Z

293

Determining the Lowest-Cost Hydrogen Delivery Mode  

E-Print Network [OSTI]

Costs to Estimate Hydrogen Pipeline Costs. 2004, ITS-Davis:hydrogen. The cost of hydrogen pipeline delivery depends onCosts to Estimate Hydrogen Pipeline Costs. 2004, ITS-Davis:

Yang, Christopher; Ogden, Joan M

2008-01-01T23:59:59.000Z

294

Costs of Generating Electrical Energy 1.0 Overview  

E-Print Network [OSTI]

be divided into two broad areas: ownership or sunk costs and operating or avoidable costs. These costs (sunk) costs Operating (avoidable) costs Interest on bonds Return to stockholders Property taxes

McCalley, James D.

295

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

analysis Costs of storing and transporting hydrogen A comprehensive comparison of fuel options for fuel cell vehicles

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

296

An algorithm for minimization of quantum cost  

E-Print Network [OSTI]

A new algorithm for minimization of quantum cost of quantum circuits has been designed. The quantum cost of different quantum circuits of particular interest (eg. circuits for EPR, quantum teleportation, shor code and different quantum arithmetic operations) are computed by using the proposed algorithm. The quantum costs obtained using the proposed algorithm is compared with the existing results and it is found that the algorithm has produced minimum quantum cost in all cases.

Anindita Banerjee; Anirban Pathak

2010-04-09T23:59:59.000Z

297

Evolving Utility Cost-Effectiveness Test Criteria  

Broader source: Energy.gov [DOE]

Presents an overview of tests done to evaluate the cost-effectiveness of energy efficiency program benefits.

298

What does a negawatt really cost?  

E-Print Network [OSTI]

We use data from ten utility conservation programs to calculate the cost per kWh of electricity saved -- the cost of a "negawatthour" -- resulting from these programs. We first compute the life-cycle cost per kWh saved ...

Joskow, Paul L.

1991-01-01T23:59:59.000Z

299

Renewable Portfolio Standards: Costs and Benefits (Poster)  

SciTech Connect (OSTI)

This report summarizes state-level RPS costs to date, and considers how those costs may evolve going forward given scheduled increases in RPS targets and cost containment mechanisms. The report also summarizes RPS benefits estimates, based on published studies for individual states and discusses key methodological considerations.

Bird, L.; Heeter, J.; Barbose, G.; Weaver, S.; Flores, F.; Kuskova-Burns, K.; Wiser, R.

2014-10-01T23:59:59.000Z

300

Computational Energy Cost of TCP Bokyung Wang  

E-Print Network [OSTI]

present results from a detailed energy measurement study of TCP. We focus on the node- level cost have characterized the cost of the primary TCP functions; (3) our node-level energy models canComputational Energy Cost of TCP Bokyung Wang Telecommunications System Division SAMSUNG

Singh, Suresh

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Costs and business models in scientific  

E-Print Network [OSTI]

Costs and business models in scientific research publishing A report commissioned by the Wellcome Trust DP-3114.p/100/04-2004/JM #12;Costs and business models in scientific research publishing A report, Cambridgeshire CB4 9ZR, UK Tel: +44 (0)1223 209400 Web: www.sqw.co.uk #12;Costs and business models in scientific

Rambaut, Andrew

302

Hydrogen Pathway Cost Distributions Jim Uihlein  

E-Print Network [OSTI]

Components Feedstock Production Delivery Total Delivered Hydrogen Cost Biomass Central Pipeline Distribution produce hydrogen at 300 psi · Liquefaction or pipeline compression included in delivery · Delivery costsHydrogen Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25

303

Liquefaction and Pipeline Costs Bruce Kelly  

E-Print Network [OSTI]

1 Liquefaction and Pipeline Costs Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8 are representative of hydrogen pipeline costs; 10 percent added to unit hydrogen costs as a contingency Better-9, 2007 Columbia, Maryland #12;2 Hydrogen Liquefaction Basic process Compress Cool to temperature

304

Defense waste transportation: cost and logistics studies  

SciTech Connect (OSTI)

Transportation of nuclear wastes from defense programs is expected to significantly increase in the 1980s and 1990s as permanent waste disposal facilities come into operation. This report uses models of the defense waste transportation system to quantify potential transportation requirements for treated and untreated contact-handled transuranic (CH-TRU) wastes and high-level defense wastes (HLDW). Alternative waste management strategies in repository siting, waste retrieval and treatment, treatment facility siting, waste packaging and transportation system configurations were examined to determine their effect on transportation cost and hardware requirements. All cost estimates used 1980 costs. No adjustments were made for future changes in these costs relative to inflation. All costs are reported in 1980 dollars. If a single repository is used for defense wastes, transportation costs for CH-TRU waste currently in surface storage and similar wastes expected to be generated by the year 2000 were estimated to be 109 million dollars. Recovery and transport of the larger buried volumes of CH-TRU waste will increase CH-TRU waste transportation costs by a factor of 70. Emphasis of truck transportation and siting of multiple repositories would reduce CH-TRU transportation costs. Transportation of HLDW to repositories for 25 years beginning in 1997 is estimated to cost $229 M in 1980 costs and dollars. HLDW transportation costs could either increase or decrease with the selection of a final canister configuration. HLDW transportation costs are reduced when multiple repositories exist and emphasis is placed on truck transport.

Andrews, W.B.; Cole, B.M.; Engel, R.L.; Oylear, J.M.

1982-08-01T23:59:59.000Z

305

The Economic Cost of Instructional Coaching  

E-Print Network [OSTI]

, this cost framework is applied to three schools with instructional coaching programs during the 2009-10 school year. The average cost per teacher was found to range from approximately $3,260 to $5,220, while model developers suggest a cost of $2,298 per...

Knight, David Stephen

2010-12-17T23:59:59.000Z

306

Update on the Cost of Nuclear Power  

E-Print Network [OSTI]

We update the cost of nuclear power as calculated in the MIT (2003) Future of Nuclear Power study. Our main focus is on the changing cost of construction of new plants. The MIT (2003) study provided useful data on the cost ...

Parsons, John E.

2009-01-01T23:59:59.000Z

307

Directives - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: CrudeOfficeNERSCDiesel pricesDirections

308

Directives - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The DesertDirections The Laboratory is on theArea

309

Directives Help - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The DesertDirections The Laboratory is on theAreaHelp by

310

Directives Quarterly Updates - DOE Directives, Delegations, and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The DesertDirections The Laboratory is on theAreaHelp

311

Directives Tools - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The DesertDirections The Laboratory is on

312

Directives Quarterly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: https://www.directives.doe.gov/directives/directives July

313

Directives Quarterly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: https://www.directives.doe.gov/directives/directives July

314

Directives Quarterly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: https://www.directives.doe.gov/directives/directives July

315

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Confusion about energy savings and economics is preventing many potentially beneficial applications for industrial heat pumps. The variety of heat pumps available and the lack of a standard rating system cause some of this confusion. The authors illustrate how a simple categorization based on coefficient of performance (COP) can compare the cost of recovering waste energy with heat pumps. After evaluating examples in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs, they compare heat pumps from the various categories on the basis of economics. 6 references, 6 figures, 1 table.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-08-01T23:59:59.000Z

316

Developing Information on Energy Savings and Associated Costs and Benefits of Energy Efficient Emerging Technologies Applicable in California  

E-Print Network [OSTI]

Cost Effectiveness Investment cost Demonstration in salad2015 Cost Effectiveness Investment cost Type of cost Change2015 Cost Effectiveness Investment cost Type of cost Change

Xu, Tengfang

2011-01-01T23:59:59.000Z

317

Low-cost inertial measurement unit.  

SciTech Connect (OSTI)

Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

Deyle, Travis Jay

2005-03-01T23:59:59.000Z

318

Ecology, 91(2), 2010, pp. 334340 2010 by the Ecological Society of America  

E-Print Network [OSTI]

al. 2006). The central problem is that investment in the public good incurs a metabolic cost that the indirect benefit (r 3 b) accruing from cooperation exceeds the direct cost (c) of investment, then public. Thus, all else being equal, cells that make reduced (or zero) public-goods investments (cheats

Gardner, Andy

319

Cost reduction potential in LMFBR design  

SciTech Connect (OSTI)

LWR capital costs have escalated continuously over the years to the point where today its economics represent a bar to further LWR deployment in the U.S. High initial costs and the promise of a similar pattern of cost escalation in succeeding years for the LMFBR would effectively stop LMFBR deployment in this country before it could even begin. LWR cost escalation in the main can be traced to large increases in both amounts and unit costs of construction materials and to greatly lengthened construction times. Innovative approaches to LMFBR design are now being pursued that show promise for substantial cost reductions particularly in those areas that have contributed most to LWR cost increases.

Chang, Y.I.; Till, C.E.

1983-08-01T23:59:59.000Z

320

Art Directable Tornadoes  

E-Print Network [OSTI]

......................................................................... 25 2. Directional Force ........................................................... 26 3. Vortex Force .................................................................. 26 4. Lattice... ................................................................... 7 7 Tornado in its rope stage before disappearing ........................................... 9 8 Fire vortex and Waterspout ........................................................................ 10 9 Landspout and Gustnado...

Dwivedi, Ravindra

2011-08-08T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Direct Discharge Permit (Vermont)  

Broader source: Energy.gov [DOE]

A direct discharge permit is required if a project involves the discharge of pollutants to state waters. For generation purposes, this involves the withdrawal of surface water for cooling purposes...

322

Material forming apparatus using a directed droplet stream  

DOE Patents [OSTI]

Systems and methods are described for rapidly forming precision metallic and intermetallic alloy net shape parts directly from liquid metal droplets. A directed droplet deposition apparatus includes a crucible with an orifice for producing a jet of material, a jet destabilizer, a charging structure, a deflector system, and an impact zone. The systems and methods provide advantages in that fully dense, microstructurally controlled parts can be fabricated at moderate cost.

Holcomb, David E. (Oak Ridge, TN); Viswanathan, Srinath (Knoxville, TN); Blue, Craig A. (Knoxville, TN); Wilgen, John B. (Oak Ridge, TN)

2000-01-01T23:59:59.000Z

323

An Attack on Centrifugal Costs  

E-Print Network [OSTI]

550 HP turbine, main tained at a fixed speed by a hydraulic governor. After analyzing this system, facilities were scoped to control the turbine speed by using a variable hydraulic governor. The oxygen control signal is now fed directly... applications. Applications discussed involve the addition of a variable speed turbine drive, the removal of ex cess system pressure drop, motor speed changes and variable drive units, and the matching of pumps to systems. INTRODUCTION The Monsanto...

Murray, P. F.

324

The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities  

SciTech Connect (OSTI)

Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee [Korea Atomic Energy Research Institute, Deokjin-dong 150, Yuseong-gu, Daejeon 305-353 (Korea, Republic of)

2007-07-01T23:59:59.000Z

325

Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards  

SciTech Connect (OSTI)

Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

Heeter, J.; Barbose, G.; Bird, L.; Weaver, S.; Flores-Espino, F.; Kuskova-Burns, K.; Wiser, R.

2014-05-01T23:59:59.000Z

326

New Directions in Direct Dark Matter Searches  

E-Print Network [OSTI]

I present the status of direct dark matter detection with specific attention to the experimental results and their phenomenological interpretation in terms of dark matter interactions. In particular I review a new and more general approach to study signals in this field based on non-relativistic operators which parametrize more efficiently the dark matter-nucleus interactions in terms of a very limited number of relevant degrees of freedom. Then I list the major experimental results, pointing out the main uncertainties that affect the theoretical interpretation of the data. Finally, since the underlying theory that describes both the dark matter and the standard model fields is unknown, I address the uncertainties coming from the nature of the interaction. In particular, the phenomenology of a class of models in which the interaction between dark matter particles and target nuclei is of a long-range type is discussed.

Paolo Panci

2014-02-06T23:59:59.000Z

327

Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements  

SciTech Connect (OSTI)

This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

Custer, W.R. Jr.; Messick, C.D.

1996-03-31T23:59:59.000Z

328

Low-Cost Solar Water Heating Research and Development Roadmap  

SciTech Connect (OSTI)

The market environment for solar water heating technology has changed substantially with the successful introduction of heat pump water heaters (HPWHs). The addition of this energy-efficient technology to the market increases direct competition with solar water heaters (SWHs) for available energy savings. It is therefore essential to understand which segment of the market is best suited for HPWHs and focus the development of innovative, low-cost SWHs in the market segment where the largest opportunities exist. To evaluate cost and performance tradeoffs between high performance hot water heating systems, annual energy simulations were run using the program, TRNSYS, and analysis was performed to compare the energy savings associated with HPWH and SWH technologies to conventional methods of water heating.

Hudon, K.; Merrigan, T.; Burch, J.; Maguire, J.

2012-08-01T23:59:59.000Z

329

Cost of Handling Texas Citrus, Fresh and Processed, 1946-47.  

E-Print Network [OSTI]

packinghouse 254,229 23,907 5,542 1,220 23,041 3,422 109,104 Items of cost: Cost in cents per 1-3/5 bushel equivalent Materials 37 5 3 17 2 7 d n 4 F( -. - - -. -. - - -- Labor 14 19 11 14 2 0 21 5 Other direct operating 2 2 2 2 2 2 2 Indirect operating 3... 3 2 3 3 2 2 Total packing cost 56 77 32 46 65 73 9 Administrative & sellin; 7 6 6 10 6 6 3 - Other operating cost 2 2 2 2 2 3 1 Total cost 65 85 4 0 5 8 73 82 13 Oranges Type of container 1-3/5 brucell-3/5 std.14/5 bruce*I% box bae*llO Ib. bag...

Samuels, J. K. (James Kenneth); Fugett, Kenneth A.

1949-01-01T23:59:59.000Z

330

Geothermal direct heat applications program summary  

SciTech Connect (OSTI)

The use of geothermal energy for direct heat purposes by the private sector within the US has been quite limited to date. However, there is a large potential market for thermal energy in such areas as industrial processing, agribusiness, and space/water heating of commercial and residential buildings. Technical and economic information is needed to assist in identifying prospective direct heat users and to match their energy needs to specific geothermal reservoirs. Technological uncertainties and associated economic risks can influence the user's perception of profitability to the point of limiting private investment in geothermal direct applications. To stimulate development in the direct heat area, the Department of Energy, Division of Geothermal Energy, issued two Program Opportunity Notices (PON's). These solicitations are part of DOE's national geothermal energy program plan, which has as its goal the near-term commercialization by the private sector of hydrothermal resources. Encouragement is being given to the private sector by DOE cost-sharing a portion of the front-end financial risk in a limited number of demonstration projects. The twenty-two projects summarized herein are direct results of the PON solicitations.

None

1980-04-01T23:59:59.000Z

331

Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint  

SciTech Connect (OSTI)

Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

2011-01-01T23:59:59.000Z

332

Cost Analysis of Fuel Cell Systems for Transportation Compressed Hydrogen and PEM Fuel Cell System  

SciTech Connect (OSTI)

PEMFC technology for transportation must be competitive with internal combustion engine powertrains in a number of key metrics, including performance, life, reliability, and cost. Demonstration of PEMFC cost competitiveness has its own challenges because the technology has not been applied to high volume automotive markets. The key stack materials including membranes, electrodes, bipolar plates, and gas diffusion layers have not been produced in automotive volumes to the exacting quality requirements that will be needed for high stack yields and to the evolving property specifications of high performance automotive stacks. Additionally, balance-of-plant components for air, water, and thermal management are being developed to meet the unique requirements of fuel cell systems. To address the question of whether fuel cells will be cost competitive in automotive markets, the DOE has funded this project to assess the high volume production cost of PEM fuel cell systems. In this report a historical perspective of our efforts in assessment of PEMFC cost for DOE is provided along with a more in-depth assessment of the cost of compressed hydrogen storage is provided. Additionally, the hydrogen storage costs were incorporated into a system cost update for 2004. Assessment of cost involves understanding not only material and production costs, but also critical performance metrics, i.e., stack power density and associated catalyst loadings that scale the system components. We will discuss the factors influencing the selection of the system specification (i.e., efficiency, reformate versus direct hydrogen, and power output) and how these have evolved over time. The reported costs reflect internal estimates and feedback from component developers and the car companies. Uncertainty in the cost projection was addressed through sensitivity analyses.

Eric J. Carlson

2004-10-20T23:59:59.000Z

333

Life cycle cost report of VHLW cask  

SciTech Connect (OSTI)

This document, the Life Cycle Cost Report (LCCR) for the VHLW Cask, presents the life cycle costs for acquiring, using, and disposing of the VHLW casks. The VHLW cask consists of a ductile iron cask body, called the shielding insert, which is used for storage and transportation, and ultimately for disposal of Defense High Level Waste which has been vitrified and placed into VHLW canisters. Each ductile iron VHLW shielding insert holds one VHLW canister. For transportation, the shielding insert is placed into a containment overpack. The VHLW cask as configured for transportation is a legal weight truck cask which will be licensed by NRC. The purpose of this LCCR is to present the development of the life cycle costs for using the VHLW cask to transport VHLW canisters from the generating sites to a disposal site. Life cycle costs include the cost of acquiring, operating, maintaining, and ultimately dispositioning the VHLW cask and its associated hardware. This report summarizes costs associated with transportation of the VHLW casks. Costs are developed on the basis of expected usage, anticipated source and destination locations, and expected quantities of VHLW which must be transported. DOE overhead costs, such as the costs associated with source and destination facility handling of the VHLW, are not included. Also not included are costs exclusive to storage or disposal of the VHLW waste.

NONE

1995-06-01T23:59:59.000Z

334

Determining the lowest-cost hydrogen delivery mode  

E-Print Network [OSTI]

costs to estimate hydrogen pipeline costs. Davis, CA: ITS-hydrogen. The cost of hydrogen pipeline delivery de- pendshydrogen trucks, and hydrogen pipelines, were devel- oped

Yang, Christopher; Ogden, Joan M

2007-01-01T23:59:59.000Z

335

Backup Power Cost of Ownership Analysis and Incumbent Technology...  

Energy Savers [EERE]

Backup Power Cost of Ownership Analysis and Incumbent Technology Comparison Backup Power Cost of Ownership Analysis and Incumbent Technology Comparison This cost of ownership...

336

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network [OSTI]

Investigation of Photovoltaic Cost Trends in California,”The Market Value and Cost of Solar Photovoltaic ElectricityThe Market Value and Cost of Solar Photovoltaic Electricity

Borenstein, Severin

2008-01-01T23:59:59.000Z

337

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

Societal lifetime cost of hydrogen fuel cell vehiclesthe societal cost of hydrogen fuel-cell vehicles with modelsand running costs) than hydrogen fuel-cell vehicles in 2030.

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

338

Development of a Direct Evaporator for the Organic Rankine Cycle  

SciTech Connect (OSTI)

This paper describes research and development currently underway to place the evaporator of an Organic Rankine Cycle (ORC) system directly in the path of a hot exhaust stream produced by a gas turbine engine. The main goal of this research effort is to improve cycle efficiency and cost by eliminating the usual secondary heat transfer loop. The project’s technical objective is to eliminate the pumps, heat exchangers and all other added cost and complexity of the secondary loop by developing an evaporator that resides in the waste heat stream, yet virtually eliminates the risk of a working fluid leakage into the gaseous exhaust stream. The research team comprised of Idaho National Laboratory and General Electric Company engineers leverages previous research in advanced ORC technology to develop a new direct evaporator design that will reduce the ORC system cost by up to 15%, enabling the rapid adoption of ORCs for waste heat recovery.

Donna Post Guillen; Helge Klockow; Matthew Lehar; Sebastian Freund; Jennifer Jackson

2011-02-01T23:59:59.000Z

339

Download Data | Transparent Cost Database  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (The followingDirect EnergyOrganization ofVirginiaYou are here Home

340

Strategic sourcing in a direct import supply chain with increasing globalization trends while mitigating risk  

E-Print Network [OSTI]

This thesis explores how a retailer should determine whether to source goods domestically vs. directly by imports through international sourcing. Through the research a landed cost model was developed and designed to ...

Scipio, Sophia E. (Sophia Elyssia)

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Delisting -- A cost effective alternative  

SciTech Connect (OSTI)

Delisting offers a cost-effective disposal option for some solid wastes that are listed as hazardous. Delisting involves treating a waste so that it must not: meet the criteria for which it was listed; exhibit any of the hazardous waste characteristics; and exhibit any additional factors, including other constituents, which may cause it to be a hazardous waste. A listed waste, including Cd, Cr, and Pb, at an abandoned manufacturing site in EPA Region 4 was extensively sampled and analyzed to define the extent and treatability of the waste and the impacted soil. A treatability study was conducted to demonstrate the efficacy of the selected treatment process so that the treated waste met each of the three criteria for exclusion. Complex and elaborate quality control procedures were executed to ensure data integrity throughout the process. The data were subjected to a fate and transport model to evaluate the migration potential of the landfilled treated waste by using EPA`s Composite Model for Landfill (CML) and Organic Leachate Model (OLM). A delisting petition was submitted to the state regulatory authority. After approval of the delisting petition, a work plan was prepared to implement the delisting procedures. The waste and impacted soil were excavated, treated and transported to a Subtitle D landfill for disposals

Pal, S.C.; Johnson, M.J. [Benchmark Engineering Inc., Birmingham, AL (United States)

1995-12-31T23:59:59.000Z

342

Financial Aid Office 2010-2011 FEDERAL DIRECT PARENT PLUS LOAN APPLICATION  

E-Print Network [OSTI]

The Federal Direct Parent PLUS Loan is available to a parent of a dependent student to help meet the cost student loans, grants, scholarships, etc). Parents may borrow up to the cost of attendance minus any be paid monthly or quarterly, or be capitalized quarterly. You may also request a deferment of any accrued

Mohaghegh, Shahab

343

Financial Aid Office 2011-2012 FEDERAL DIRECT PARENT PLUS LOAN APPLICATION  

E-Print Network [OSTI]

The Federal Direct Parent PLUS Loan is available to a parent of a dependent student to help meet the cost may borrow up to the cost of attendance minus any financial aid the student is expected to receive the date the loan funds are disbursed. Interest can be paid monthly or quarterly, or be capitalized

Mohaghegh, Shahab

344

Financial Aid Office SUMMER 2011 FEDERAL DIRECT PARENT PLUS LOAN APPLICATION  

E-Print Network [OSTI]

The Federal Direct Parent PLUS Loan is available to a parent of a dependent student to help meet the cost student loans, grants, scholarships, etc). Parents may borrow up to the cost of attendance minus any the date the loan funds are disbursed. Interest can be paid monthly or quarterly, or be capitalized

Mohaghegh, Shahab

345

Directed Relativistic Blast Wave  

E-Print Network [OSTI]

A spherically symmetrical ultra-relativistic blast wave is not an attractor of a generic asymmetric explosion. Spherical symmetry is reached only by the time the blast wave slows down to non-relativistic velocities, when the Sedov-Taylor-von Neumann attractor solution sets in. We show however, that a directed relativistic explosion, with the explosion momentum close to the explosion energy, produces a blast wave with a universal intermediate asymptotic -- a selfsimilar directed ultra-relativistic blast wave. This universality might be of interest for the astrophysics of gamma-ray burst afterglows.

Andrei Gruzinov

2007-04-23T23:59:59.000Z

346

Directives Points of Contact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: CrudeOfficeNERSCDiesel pricesDirectionsDirectives

347

Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs  

E-Print Network [OSTI]

transit – exceeded capital cost estimates by 40% duringfound that capital costs exceeded estimates by an averagesystems. We estimate the total capital cost, average weekday

Guerra, Erick; Cervero, Robert

2010-01-01T23:59:59.000Z

348

Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs  

E-Print Network [OSTI]

mile. Soaring capital investment costs are today’ s biggestof riders for the investment costs? If so, what minimumrelationship between investment costs and urban densities

Guerra, Erick; Cervero, Robert

2010-01-01T23:59:59.000Z

349

Transferability of results from direct load-control (DLC) experiments. Final report  

SciTech Connect (OSTI)

The ability to use test data from another utility to estimate whether a proposed direct load-control program would be cost-effective could save a utility millions of dollars in experimentation costs. Though more work is necessary, this model represents a beginning for the reliable transfer of aggregate site-level data. A computer disk, ''Direct Load Control Impact Assessment Model,'' is included.

Babcock, W.H.; Eckel, J.W.

1986-05-01T23:59:59.000Z

350

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

total installed capital cost (TIC) 1% Of TIC 25% Estimate ofcost estimates for six station types SMR 100 a Equipment capital

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

351

Aerogel commercialization: Technology, markets and costs  

SciTech Connect (OSTI)

Commercialization of aerogels has been slow due to several factors including cost and manufacturability issues. The technology itself is well enough developed as a result of work over the past decade by an international-community of researchers. Several extensive substantial markets appear to exist for aerogels as thermal and sound insulators, if production costs can keep prices in line with competing established materials. The authors discuss here the elements which they have identified as key cost drivers, and they give a prognosis for the evolution of the technology leading to reduced cost aerogel production.

Carlson, G.; Lewis, D.; McKinley, K.; Richardson, J.; Tillotson, T.

1994-10-07T23:59:59.000Z

352

Optimization Online - Option - Alloction funds- Transaction costs  

E-Print Network [OSTI]

Apr 18, 2009 ... The replication strategy allows reducing transaction cost effects. ... the empirical evidence poses the case of a short-term investment, on CAC40 ...

Nader Trabelsi

2009-04-18T23:59:59.000Z

353

The Law and Economics of Costly Contracting  

E-Print Network [OSTI]

Markets, Relational Contracting, New York: Free Press (and the Value of Contracting,” 89 American Economic ReviewLAW AND ECONOMICS OF COSTLY CONTRACTING BY ALAN SCHWARTZ AND

Schwartz, Alan; Watson, Joel

2001-01-01T23:59:59.000Z

354

Cost of Fuel to General Electricity  

Broader source: Energy.gov [DOE]

Presentation covers the topic of the cost of fuel to general electricity for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

355

Wind Turbine Design Cost and Scaling Model  

SciTech Connect (OSTI)

This model intends to provide projections of the impact on cost from changes in economic indicators such as the Gross Domestic Product and Producer Price Index.

Fingersh, L.; Hand, M.; Laxson, A.

2006-12-01T23:59:59.000Z

356

Costs and benefits of robust optimization  

E-Print Network [OSTI]

result concerning costs for robust linear optimization under convex uncertainty. In ... In [3], a stability analysis of robust optimization for linear problems under ...

2010-11-13T23:59:59.000Z

357

Process Equipment Cost Estimation, Final Report  

SciTech Connect (OSTI)

This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

H.P. Loh; Jennifer Lyons; Charles W. White, III

2002-01-01T23:59:59.000Z

358

Minimum cost model energy code envelope requirements  

SciTech Connect (OSTI)

This paper describes the analysis underlying development of the U.S. Department of Energy`s proposed revisions of the Council of American Building Officials (CABO) 1993 Model Energy Code (MEC) building thermal envelope requirements for single-family and low-rise multifamily residences. This analysis resulted in revised MEC envelope conservation levels based on an objective methodology that determined the minimum-cost combination of energy efficiency measures (EEMs) for residences in different locations around the United States. The proposed MEC revision resulted from a cost-benefit analysis from the consumer`s perspective. In this analysis, the costs of the EEMs were balanced against the benefit of energy savings. Detailed construction, financial, economic, and fuel cost data were compiled, described in a technical support document, and incorporated in the analysis. A cost minimization analysis was used to compare the present value of the total long-nm costs for several alternative EEMs and to select the EEMs that achieved the lowest cost for each location studied. This cost minimization was performed for 881 cities in the United States, and the results were put into the format used by the MEC. This paper describes the methodology for determining minimum-cost energy efficiency measures for ceilings, walls, windows, and floors and presents the results in the form of proposed revisions to the MEC. The proposed MEC revisions would, on average, increase the stringency of the MEC by about 10%.

Connor, C.C.; Lucas, R.G.; Turchen, S.J.

1994-08-01T23:59:59.000Z

359

23rd steam-station cost survey  

SciTech Connect (OSTI)

The results of the 23rd Steam Station Cost Survey covering the year 1982 are summarized. The major categories of the survey are as follows: general data; output data, 1982; fuel consumption, 1982; operation 1982 (mills/net kWh); investment ($/net kWh); energy cost, 1982 (mills/net kWh); and station performance, 1982. Thirty-one fossil-fuel steam plants and four nuclear stations were included in the survey. Fuel and operating cost increases are felt to be responsible for the moderate rise in total busbar-enery costs. 11 figures, 1 table.

Friedlander, G.D.; Going, M.C.

1983-11-01T23:59:59.000Z

360

Direct from CDC's Environmental  

E-Print Network [OSTI]

Direct from CDC's Environmental Health Services Branch CAPT Daniel M. Harper, M.P.H. A Diverse Environmental Public Health Workforce to Meet the Diverse Environmental Health Challenges on environmental health and to build part nerships in the profession. In pursuit of these goals, we will feature

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Direct from CDC's Environmental  

E-Print Network [OSTI]

Direct from CDC's Environmental Health Services Branch CAPT John Sarisky, R.S., M.P.H. Developing Environmental Public Health Leadership Editor's note: NEHA strives to provide up to of these goals, we will feature a column from the Environmental Health Services Branch (EHSB) of the Centers

362

Direct from CDC's Environmental  

E-Print Network [OSTI]

Direct from CDC's Environmental Health Services Branch Daneen Farrow Collier, M.S.P.H. Editor's note: NEHA strives to pro vide up-to-date and relevant informa tion on environmental health the Environmental Health Services Branch (EHSB) of the Centers for Disease Control and Pre vention (CDC) in every

363

Direct from CDC's Environmental  

E-Print Network [OSTI]

Direct from CDC's Environmental Health Services Branch Brian Hubbard, M.P.H. Editor the Environmental Health Services Branch (EHSB) of the Centers for Disease Con trol and Prevention (CDC) in every environmental health programs and professionals to antici pate, identify, and respond to adverse envi ronmental

364

Direct fired heat exchanger  

SciTech Connect (OSTI)

A gas-to-liquid heat exchanger system which transfers heat from a gas, generally the combustion gas of a direct-fired generator of an absorption machine, to a liquid, generally an absorbent solution. The heat exchanger system is in a counterflow fluid arrangement which creates a more efficient heat transfer.

Reimann, Robert C. (Lafayette, NY); Root, Richard A. (Spokane, WA)

1986-01-01T23:59:59.000Z

365

Directional gamma detector  

DOE Patents [OSTI]

An improved directional gamma radiation detector has a collector sandwiched etween two layers of insulation of varying thicknesses. The collector and insulation layers are contained within an evacuated casing, or emitter, which releases electrons upon exposure to gamma radiation. Delayed electrons and electrons entering the collector at oblique angles are attenuated as they pass through the insulation layers on route to the collector.

LeVert, Francis E. (Downers Grove, Knoxville, TN); Cox, Samson A. (Downers Grove, IL)

1981-01-01T23:59:59.000Z

366

Extension of DOE Directives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Notice extends the following directives until 2/16/04: DOE N 205.2, Foreign National Access to DOE Cyber Systems, and DOE N 205.3, Password Generation, Protection, and Use, dated 11/23/99-7/1/00.

2003-02-24T23:59:59.000Z

367

Extension of DOE Directives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The following directives are extended until 8-12-04. DOE N 205.2, Foreign National Access to DOE Cyber Systems, dated 11/1/99. DOE N 205.3, Password Generation, Protection, and Use, dated 11/23/99.

2004-02-12T23:59:59.000Z

368

Extension of DOE Directives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The following directives are extended until 8-12-05: DOE N 205.2, Foreign National Access to DOE Cyber Security Systems, dated 11-1-99 and DOE N 205.3, Password Generation, Protection, and Use, dated 11-23-99. No cancellations.

2004-08-12T23:59:59.000Z

369

Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012  

SciTech Connect (OSTI)

The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawai�¢����i and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the predicted economies of scale as technology and efficiency improvements are realized and larger more economical plants deployed. Utilizing global high resolution OTEC resource assessment from the Ocean Thermal Extractable Energy Visualization (OTEEV) project (an independent DOE project), Global Energy Supply Curves were generated for Grid Connected and Energy Carrier OTEC plants deployed in 2045 when the predicted technology and efficiencies improvements are fully realized. The Global Energy Supply Curves present the LCOE versus capacity in ascending order with the richest, lowest cost resource locations being harvested first. These curves demonstrate the vast ocean thermal resource and potential OTEC capacity that can be harvested with little change in LCOE.

Martel, Laura; Smith, Paul; Rizea, Steven; Van Ryzin, Joe; Morgan, Charles; Noland, Gary; Pavlosky, Rick; Thomas, Michael

2012-06-30T23:59:59.000Z

370

ICPP tank farm closure study. Volume 3: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates  

SciTech Connect (OSTI)

This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option.

NONE

1998-02-01T23:59:59.000Z

371

Pathway to a lower cost high repetition rate ignition facility  

SciTech Connect (OSTI)

An approach to a high-repetition ignition facility based on direct drive with the krypton-fluoride laser is presented. The objective is development of a 'Fusion Test Facility' that has sufficient fusion power to be useful as a development test bed for power plant materials and components. Calculations with modern pellet designs indicate that laser energies well below a megajoule may be sufficient. A smaller driver would result in an overall smaller, less complex and lower cost facility. While this facility might appear to have most direct utility to inertial fusion energy, the high flux of neutrons would also be able to address important issues concerning materials and components for other approaches to fusion energy. The physics and technological basis for the Fusion Test Facility are presented along with a discussion of its applications.

Obenschain, S.P.; Colombant, D.G.; Schmitt, A.J.; Sethian, J.D.; McGeoch, M. W. [Plasma Physics Division, U.S. Naval Research Laboratory, Washington, D.C. 20375 (United States); Plex LLC, Brookline, Massachusetts 02446-5478 (United States)

2006-05-15T23:59:59.000Z

372

Cost Estimating Handbook for Environmental Restoration  

SciTech Connect (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

373

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

E-Print Network [OSTI]

Developments in the Levelized Cost of Energy From U.S. Windreducing the levelized cost of energy (LCOE) for onshore

Wiser, Ryan

2013-01-01T23:59:59.000Z

374

Cost Structure and Control: The Dominant Issues in  

E-Print Network [OSTI]

or not a crop is planted (the costs are sunk) whereas variable costs will increase or decrease as a function

375

External Costs of Transport in the U.S.  

E-Print Network [OSTI]

externalities are the unaccounted for or unpriced costs ofexplicit prices and unaccounted-for costs of those choices.

Delucchi, Mark A.; McCubbin, Donald R.

2010-01-01T23:59:59.000Z

376

Low-Cost Manufacturable Microchannel Systems for Passive  

E-Print Network [OSTI]

for use in fuel cell systems need development in order to achieve cost targets. Low-cost, highLow-Cost Manufacturable Microchannel Systems for Passive PEM Water Management IIPS Number 16910 LowLow--CostCost;2 Project objective: Create a low cost and passive PEM water management system Project objective

377

Interdisciplinary Institute for Innovation Estimating the costs of nuclear  

E-Print Network [OSTI]

on this topic is fairly confusing. Some present electricity production using nuclear power as an affordable of costs and draw a distinction between a private cost and a social cost. The private cost is what evaluating the costs it is impossible to establish the cost price, required to compare electricity production

Paris-Sud XI, Université de

378

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

E-Print Network [OSTI]

fuel cell vehicles have the potential to eliminate the need for oil in the transportation sector. Fuel, fuel cell vehicles offer an environmentally clean and energysecure transportation pathway for transportation. Fuel cell systems will have to be costcompetitive with conventional and advanced vehicle

379

Direct Thin Film Path to Low Cost, Large Area III-V Photovoltaics - Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesDataTranslocation of Shewanella OneidensistheSynthesis ofInnovation

380

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopment Accident Tolerant Fuel:Market

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopment Accident Tolerant Fuel:MarketAutomotive Applications:

382

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopment Accident Tolerant Fuel:MarketAutomotive

383

Mass Production Cost Estimation of Direct Hydrogen PEM Fuel Cell Systems  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopment Accident Tolerant Fuel:MarketAutomotiveTransportationfor

384

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

can operate on hydrogen, which can be produced domestically, emitting less greenhouse gas and pollutants than conventional internal combustion engine (ICE), advanced ICE, hybrid...

385

mMass Production Cost Estimation for Direct H2 PEM Fuel Cell...  

Broader source: Energy.gov (indexed) [DOE]

of energy sources can be used to produce hydrogen, including nuclear, coal, natural gas, geothermal, wind, hydroelectric, solar, and biomass. Thus, fuel cell vehicles offer an...

386

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

of energy sources can be used to produce hydrogen, including nuclear, coal, natural gas, geothermal, wind, hydroelectric, solar, and biomass. Thus, fuel cell vehicles offer an...

387

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems...  

Broader source: Energy.gov (indexed) [DOE]

portfolio of energy sources can be used to produce it, including nuclear, coal, natural gas, geothermal, wind, hydroelectric, solar, and biomass. Thus fuel cell vehicles offer an...

388

Low-Cost Direct Bonded Aluminum (DBA) Substrates | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10IO1OP001Long-Term StorageDepartmentSystem

389

Manufacturing Cost Analysis of 10 kW and 25 kW Direct Hydrogen Polymer  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of Energy Low-TemperatureEnergy Maine09

390

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopment Accident Tolerant Fuel:Market Transformation2

391

Mass Production Cost Estimation for Direct H2 PEM Fuel Cell Systems for  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopment Accident Tolerant Fuel:Market Transformation2Automotive

392

ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement ID:23278)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLC Order No. EA-178-A1ORAU South0/120 FUNGIBLE AND251|

393

2009 Cost Estimates of Establishing and  

E-Print Network [OSTI]

2009 Cost Estimates of Establishing and Producing Gala Apples in Washington WASHINGTON STATE include estimating 1) the costs of the equipment, materials, supplies, and labor required to establish for any particular orchard operation due to case-specific: · Capital, labor, and natural resources · Crop

Collins, Gary S.

394

2013 Cost Estimation of Establishing a  

E-Print Network [OSTI]

1 2013 Cost Estimation of Establishing a Cider Apple Orchard in Western Washington W A S H I N G factors: · Capital, labor, and natural resources · Crop yield · Cultural practices · Input prices Cost estimations in this enterprise budget also vary depending on the budget's intended use. To avoid

Collins, Gary S.

395

www.praxair.com Low Cost Hydrogen  

E-Print Network [OSTI]

www.praxair.com Low Cost Hydrogen Production Platform Cooperative Agreement: DE-FC36-01GO11004 Timothy M. Aaron Team Praxair - Tonawanda, NY Boothroyd-Dewhurst - Wakefield, RI Diversified Manufacturing (Hot Components Only) Praxair HGS Comparison 1/4 Capacity 1/6 Physical Plant Size Lower H2 Cost

396

Draft Submission; Social Cost of Energy Generation  

SciTech Connect (OSTI)

This report is intended to provide a general understanding of the social costs associated with electric power generation. Based on a thorough review of recent literature on the subject, the report describes how these social costs can be most fully and accurately evaluated, and discusses important considerations in applying this information within the competitive bidding process. [DJE 2005

None

1990-01-05T23:59:59.000Z

397

Costs of Oil Dependence: A 2000 Update  

SciTech Connect (OSTI)

Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

Greene, D.L.

2000-05-17T23:59:59.000Z

398

Cost of Oil Dependence: A 2000 Update  

SciTech Connect (OSTI)

Oil dependence remains a potentially serious economic and strategic problem for the United States. This report updates previous estimates of the costs of oil dependence to the U.S. economy and introduces several methodological enhancements. Estimates of the costs to the U.S. economy of the oil market upheavals of the last 30 years are in the vicinity of $7 trillion, present value 1998 dollars, about as large as the sum total of payments on the national debt over the same period. Simply adding up historical costs in 1998 dollars without converting to present value results in a Base Case cost estimate of $3.4 trillion. Sensitivity analysis indicates that cost estimates are sensitive to key parameters. A lower bound estimate of $1.7 trillion and an upper bound of $7.1 trillion (not present value) indicate that the costs of oil dependence have been large under almost any plausible set of assumptions. These cost estimates do not include military, strategic or political costs associated with U.S. and world dependence on oil imports.

Greene, D.L.; Tishchishyna, N.I.

2000-05-01T23:59:59.000Z

399

BUSINESS PLAN NIRMAL: LOW COST WATER PURIFICATION  

E-Print Network [OSTI]

the water. Hence we intend to address the issue by providing a low cost water purification system usingNIRMAL #12;BUSINESS PLAN 2 NIRMAL: LOW COST WATER PURIFICATION I. Executive summary Nearly one area, it makes sense to transport the point of use purification system itself. Field research by team

Mlllet, Dylan B.

400

Costs of Growing Broilers Under Cotract.  

E-Print Network [OSTI]

................................................................................ Interest 6 ...... Taxes 6 Other Costs of the Broiler Grower . 6 Heat for Brooding 6 . . . . Electr~c~ty for Lighting ......................................................... 6 Labor-Regular Care... .......................................................... 6 Labor-Catching Birds ....................................................... 6 Cleaning Out Manure ......................................................... 6 Costs and Returns-Contract Broiler Production .......................... 6 Part...

Magee, A. C. (Aden Combs); Stone, B. H.; Wormeli, B. C. (Ben C.)

1964-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

High Performance, Low Cost Hydrogen Generation from  

E-Print Network [OSTI]

Alternate deposition techniques and engineered nanostructures Supplier qualification, near term cost Qualification · Task 7.0: H2A Model Cost Analysis ­ Input design parameters ­ Assess impact of changes #12% 5 Bipolar Plate Manufacturing Development 06/30/13 0% 6 Bipolar Plate Manufacturing Qualification 09

402

Multiperiod Portfolio Optimization with General Transaction Costs  

E-Print Network [OSTI]

Department of Management Science and Operations, London Business School, ... For market impact costs, we show that the optimal portfolio policy at each ... Markowitz's analysis are that the investor only cares about single-period ... The case with a single-risky asset and proportional transaction costs is well understood.

2013-07-17T23:59:59.000Z

403

Los Alamos National Laboratory Building Cost Index  

SciTech Connect (OSTI)

The Los Alamos National Laboratory Building Cost Index indicates that actual escalation since 1970 is near 10% per year. Therefore, the Laboratory will continue using a 10% per year escalation rate for construction estimates through 1985 and a slightly lower rate of 8% per year from 1986 through 1990. The computerized program compares the different elements involved in the cost of a typical construction project, which for our purposes, is a complex of office buildings and experimental laboratores. The input data used in the program consist primarily of labor costs and material and equipment costs. The labor costs are the contractural rates of the crafts workers in the Los Alamos area. For the analysis, 12 field-labor draft categories are used; each is weighted corresponding to the labor craft distribution associated with the typical construction project. The materials costs are current Los Alamos prices. Additional information sources include material and equipment quotes obtained through conversations with vendors and from trade publications. The material and equipment items separate into 17 categories for the analysis and are weighted corresponding to the material and equipment distribution associated with the typical construction project. The building cost index is compared to other national building cost indexes.

Orr, H.D.; Lemon, G.D.

1983-01-01T23:59:59.000Z

404

Los Alamos National Laboratory building cost index  

SciTech Connect (OSTI)

The Los Alamos National Laboratory Building Cost Index indicates that actual escalation since 1970 is near 10% per year. Therefore, the Laboratory will continue using a 10% per year escalation rate for construction estimates through 1985 and a slightly lower rate of 8% per year from 1986 through 1990. The computerized program compares the different elements involved in the cost of a typical construction project, which for our purposes, is a complex of office buildings and experimental laboratories. The input data used in the program consist primarily of labor costs and material and equipment costs. The labor costs are the contractual rates of the crafts workers in the Los Alamos area. For the analysis, 12 field-labor craft categories are used; each is weighted corresponding to the labor craft distribution associated with the typical construction project. The materials costs are current Los Alamos prices. Additional information sources include material and equipment quotes obtained through conversations with vendors and from trade publications. The material and equipment items separate into 17 categories for the analysis and are weighted corresponding to the material and equipment distribution associated with the typical construction project. The building cost index is compared to other national building cost indexes.

Orr, H.D.; Lemon, G.D.

1982-10-01T23:59:59.000Z

405

Cost Codes and the Work Breakdown Structure  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The chapter discusses the purpose of the work breakdown structure (WBS) and code of account (COA) cost code system, shows the purpose and fundamental structure of both the WBS and the cost code system, and explains the interface between the two systems.

1997-03-28T23:59:59.000Z

406

NPR (New Production Reactor) capacity cost evaluation  

SciTech Connect (OSTI)

The ORNL Cost Evaluation Technical Support Group (CETSG) has been assigned by DOE-HQ Defense Programs (DP) the task defining, obtaining, and evaluating the capital and life-cycle costs for each of the technology/proponent/site/revenue possibilities envisioned for the New Production Reactor (NPR). The first part of this exercise is largely one of accounting, since all NPR proponents use different accounting methodologies in preparing their costs. In order to address this problem of comparing ''apples and oranges,'' the proponent-provided costs must be partitioned into a framework suitable for all proponents and concepts. If this is done, major cost categories can then be compared between concepts and major cost differences identified. Since the technologies proposed for the NPR and its needed fuel and target support facilities vary considerably in level of technical and operational maturity, considerable care must be taken to evaluate the proponent-derived costs in an equitable manner. The use of cost-risk analysis along with derivation of single point or deterministic estimates allows one to take into account these very real differences in technical and operational maturity. Chapter 2 summarizes the results of this study in tabular and bar graph form. The remaining chapters discuss each generic reactor type as follows: Chapter 3, LWR concepts (SWR and WNP-1); Chapter 4, HWR concepts; Chapter 5, HTGR concept; and Chapter 6, LMR concept. Each of these chapters could be a stand-alone report. 39 refs., 36 figs., 115 tabs.

none,

1988-07-01T23:59:59.000Z

407

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Hydrogen production equipment Puri?er Storage system Compressor Dispenser Additional equipment Installation costshydrogen storage vessels and compressors. 2.4.4. Feedstock costhydrogen equipment costs. Meyers [2] pro- vides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

408

Energy Management and Cost Analysis (A case study)  

E-Print Network [OSTI]

Abstract — Lighting constitutes a main portion of energy consumption in commercial and industrial sector. The Energy Auditing is the key of the consumption which stabilize the situation of energy crisis by providing the conservation schemes. Any organization so called bulk consumer of electrical energy propose to adopt suitable technology or scheme of energy conservation to minimize the unwanted power shutdown either incidentally or by load shedding. In educational buildings a significant component of the energy used is spent in illuminating the interior of the building. As the energy costs increases, possible efforts are to be done to minimize the energy consumption of lighting installations. This follow three basic directions: new more efficient equipment (lamps, control gear, etc.), utilization of improved lighting design practices, improvements in lighting control systems to avoid energy waste for unoccupied and daylight hours. In this paper an Energy audit has been conducted in the educational Institute to estimate the Energy consumption. In this Energy audit the cost analysis and pay back periods have been calculated by replacing the higher consumption lamps with Energy efficient Lightning. The profit of implementing the energy efficiency measures in buildings are considerable both in terms of energy savings and cost savings.

unknown authors

409

Unconventional Staging Package Selection Leads to Cost Savings  

SciTech Connect (OSTI)

In late 2010, U.S. Department of Energy (DOE) Deputy Secretary of Energy, Daniel Poneman, directed that an analysis be conducted on the U-233 steel-clad, Zero Power Reactor (ZPR) fuel plates that were stored at Oak Ridge National Laboratory (ORNL), focusing on cost savings and any potential DOE programmatic needs for the special nuclear material (SNM). The NA-162 Nuclear Criticality Safety Program requested retention of these fuel plates for use in experiments at the Nevada National Security Site (NNSS). A Secretarial Initiative challenged ORNL to make the first shipment to the NNSS by the end of the 2011 calendar year, and this effort became known as the U-233 Project Accelerated Shipping Campaign. To meet the Secretarial Initiative, National Security Technologies, LLC (NSTec), the NNSS Management and Operations contractor, was asked to facilitate the receipt and staging of the U-233 fuel plates in the Device Assembly Facility (DAF). Because there were insufficient staging containers available for the fuel plates, NSTec conducted an analysis of alternatives. The project required a staging method that would reduce the staging footprint while addressing nuclear criticality safety and radiation exposure concerns. To accommodate an intermediate staging method of approximately five years, the NSTec project team determined that a unique and unconventional staging package, the AT-400R, was available to meet the project requirements. By using the AT-400R containers, NSTec was able to realize a cost savings of approximately $10K per container, a total cost savings of nearly $450K.

,

2012-06-07T23:59:59.000Z

410

Industrial heat pumps: types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP), is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-03-01T23:59:59.000Z

411

Industrial heat pumps - types and costs  

SciTech Connect (OSTI)

Many potentially beneficial applications for industrial heat pumps are not being pursued because of confusion regarding both energy savings and economics. Part of this confusion stems from the variety of heat pumps available and the fact that the measure of merit, the coefficient of performance (COP) is commonly defined in at least three different ways. In an attempt to circumvent this problem, a simple categorization was developed based on the commonly accepted COP definitions. Using this categorization, the cost of recovering waste energy with heat pumps was examined. Examples were evaluated in which the cost of energy delivered was calculated based on estimates of capital cost, operating costs, and maintenance costs. Heat pumps from the various categories were then compared on the basis of economics. 6 refs., 7 figs.

Chappell, R.N.; Bliem, C.J. Jr.; Mills, J.I.; Demuth, O.J.; Plaster, D.S.

1985-01-01T23:59:59.000Z

412

Nuclear plant cancellations: causes, costs, and consequences  

SciTech Connect (OSTI)

This study was commissioned in order to help quantify the effects of nuclear plant cancellations on the Nation's electricity prices. This report presents a historical overview of nuclear plant cancellations through 1982, the costs associated with those cancellations, and the reasons that the projects were terminated. A survey is presented of the precedents for regulatory treatment of the costs, the specific methods of cost recovery that were adopted, and the impacts of these decisions upon ratepayers, utility stockholders, and taxpayers. Finally, the report identifies a series of other nuclear plants that remain at risk of canellation in the future, principally as a result of similar demand, finance, or regulatory problems cited as causes of cancellation in the past. The costs associated with these potential cancellations are estimated, along with their regional distributions, and likely methods of cost recovery are suggested.

Not Available

1983-04-01T23:59:59.000Z

413

Time-Energy Costs of Quantum Measurements  

E-Print Network [OSTI]

Time and energy of quantum processes are a tradeoff against each other. We propose to ascribe to any given quantum process a time-energy cost to quantify how much computation it performs. Here, we analyze the time-energy costs for general quantum measurements, along a similar line as our previous work for quantum channels, and prove exact and lower bound formulae for the costs. We use these formulae to evaluate the efficiencies of actual measurement implementations. We find that one implementation for a Bell measurement is optimal in time-energy. We also analyze the time-energy cost for unambiguous state discrimination and find evidence that only a finite time-energy cost is needed to distinguish any number of states.

Chi-Hang Fred Fung; H. F. Chau

2014-05-08T23:59:59.000Z

414

Calculating Wind Integration Costs: Separating Wind Energy Value from Integration Cost Impacts  

SciTech Connect (OSTI)

Accurately calculating integration costs is important so that wind generation can be fairly compared with alternative generation technologies.

Milligan, M.; Kirby, B.

2009-07-01T23:59:59.000Z

415

Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks  

SciTech Connect (OSTI)

Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

Lacey, Ph.D, P.E., Ronald E. [Texas A& M University

2012-07-16T23:59:59.000Z

416

Direct hydrocarbon fuel cells  

DOE Patents [OSTI]

The direct electrochemical oxidation of hydrocarbons in solid oxide fuel cells, to generate greater power densities at lower temperatures without carbon deposition. The performance obtained is comparable to that of fuel cells used for hydrogen, and is achieved by using novel anode composites at low operating temperatures. Such solid oxide fuel cells, regardless of fuel source or operation, can be configured advantageously using the structural geometries of this invention.

Barnett, Scott A.; Lai, Tammy; Liu, Jiang

2010-05-04T23:59:59.000Z

417

Direct drive wind turbine  

DOE Patents [OSTI]

A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.

Bywaters, Garrett; Danforth, William; Bevington, Christopher; Jesse, Stowell; Costin, Daniel

2006-10-10T23:59:59.000Z

418

Direct drive wind turbine  

DOE Patents [OSTI]

A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.

Bywaters, Garrett; Danforth, William; Bevington, Christopher; Stowell, Jesse; Costin, Daniel

2006-07-11T23:59:59.000Z

419

Direct drive wind turbine  

DOE Patents [OSTI]

A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.

Bywaters, Garrett Lee; Danforth, William; Bevington, Christopher; Stowell, Jesse; Costin, Daniel

2006-09-19T23:59:59.000Z

420

Direct drive wind turbine  

DOE Patents [OSTI]

A wind turbine is provided that minimizes the size of the drive train and nacelle while maintaining the power electronics and transformer at the top of the tower. The turbine includes a direct drive generator having an integrated disk brake positioned radially inside the stator while minimizing the potential for contamination. The turbine further includes a means for mounting a transformer below the nacelle within the tower.

Bywaters, Garrett; Danforth, William; Bevington, Christopher; Jesse, Stowell; Costin, Daniel

2007-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Directional drilling sub  

SciTech Connect (OSTI)

A directional drilling ''sub'' provides a shifting end portion which allows the sub to be rotated from a first in-line axially straight orientation with the drill string to a second angled or ''bent'' position which second position is normally associated with conventional bent ''subs'' which are permanently structured in the bent position. The device shifts from the first (In-line) position to the second (Bent) position upon the application of torsional force thereto which torsional force can be applied, for example, by the actuation of a ''turbodrill'' (Normally attached thereto in operation). The device can be manufactured or machined to provide varying angles to the sub in its bent position to satisfy differing directional drilling situations. The axially aligned first position allows easy entry of the drill string, sub , and turbodrill into the well hole, while the second bend position is used to commence directional drilling. The sub will return gradually to its original axially aligned position when the device is withdrawn from the wellhole, as such position is the path of minimum resistance for the withdrawing drill string and torsion is not present to hold the sub in the bent position.

Benoit, L.F.

1980-09-02T23:59:59.000Z

422

Cost Improvements, Returns to Scale, and Cost Inefficiencies for Real Estate Investment Trusts*  

E-Print Network [OSTI]

) operating efficiencies. We estimate stochastic-frontier, panel-data models specifying a translog cost of the competitive advantage include economies of scale, lower capital costs, and superior sources of capital. Specifying a translog cost function and using 1995 to 2003 data, we estimate a stochastic-frontier panel

Ahmad, Sajjad

423

Reducing the Cost of Solar Cells  

SciTech Connect (OSTI)

Solar-powered electricity prices could soon approach those of power from coal or natural gas thanks to collaborative research with solar startup Ampulse Corporation at the National Renewable Energy Laboratory. Silicon wafers account for almost half the cost of today's solar photovoltaic panels, so reducing or eliminating wafer costs is essential to bringing prices down. Current crystalline silicon technology converts energy in a highly efficient manner; however, that technology is manufactured with processes that could stand some improvement. The industry needs a method that is less complex, creates less waste and uses less energy. First, half the refined silicon is lost as dust in the wafer-sawing process, driving module costs higher. Wafers are sawn off of large cylindrical ingots, or boules, of silicon. A typical 2-meter boule loses as many as 6,000 potential wafers during sawing. Second, the wafers produced are much thicker than necessary. To efficiently convert sunlight into electricity, the wafers need be only one-tenth the typical thickness. NREL, the Oak Ridge National Laboratory and Ampulse have partnered on an approach to eliminate this waste and dramatically lower the cost of the finished solar panels. By using a chemical vapor deposition process to grow the silicon on inexpensive foil, Ampulse is able to make the solar cells just thick enough to convert most of the solar energy into electricity. No more sawdust - and no more wasting refined silicon materials. NREL developed the technology to grow high-quality silicon and ORNL developed the metal foil that has the correct crystal structure to support that growth. Ampulse is installing a pilot manufacturing line in NREL's Process Development Integration Laboratory, where solar companies can work closely with lab scientists on integrated equipment to answer pressing questions related to their technology development, as well as rapidly overcoming R and D challenges and risk. NREL's program is focused on transformative innovation in the domestic PV industry. With knowledge and expertise acquired from the PDIL pilot production line tools, Ampulse plans to design a full-scale production line to accommodate long rolls of metal foil. The Ampulse process 'goes straight from pure silicon-containing gas to high-quality crystal silicon film,' said Brent Nelson, the operational manager for the Process Development Integration Laboratory. 'The advantage is you can make the wafer just as thin as you need it - 10 microns or less.' Most of today's solar cells are made out of wafer crystalline silicon, though thin-film cells made of more exotic elements such as copper, indium, gallium, arsenic, cadmium, tellurium and others are making a strong push into the market. The advantage of silicon is its abundance, because it is derived from sand. Silicon's disadvantage is that purifying it into wafers suitable for solar cells can be expensive and energy intensive. Manufacturers add carbon and heat to sand to produce metallurgical-grade silicon, which is useful in other industries, but not yet suitable for making solar cells. So this metallurgical-grade silicon is then converted to pure trichlorosilane (SiCl3) or silane (SiH4) gas. Typically, the purified gas is then converted to create a silicon feedstock at 1,000 degrees Celsius. This feedstock is melted at 1,414 C and recrystallized into crystal ingots that are finally sawed into wafers. The Ampulse method differs in that it eliminates the last two steps in the traditional process and works directly with the silane gas growing only the needed silicon right onto a foil substrate. A team of NREL scientists had developed a way to use a process called hot-wire chemical vapor deposition to thicken silicon wafers with near perfect crystal structure. Using a hot tungsten filament much like the one found in an incandescent light bulb, the silane gas molecules are broken apart and deposited onto the wafer using the chemical vapor deposition technique at about 700 C - a much lower temperature than needed to make the wafer. The hot filament dec

Scanlon, B.

2012-04-01T23:59:59.000Z

424

Achieving MinimumCost Multicast: A Decentralized Approach Based on Network Coding  

E-Print Network [OSTI]

, a monetary or energy cost must be paid for each link usage) and the other that applies for strictly convex­to­point links, and consider the problem of minimum­energy multicast in wireless networks as well as the case generally means finding the shortest tree connecting a set of points in a directed graph; in other words

MĂ©dard, Muriel

425

DEVELOPMENT OF A LOW-COST ROBOTIC MANIPULATOR AND ITS APPLICATION TO HUMAN MOTOR CONTROL STUDIES  

E-Print Network [OSTI]

DEVELOPMENT OF A LOW-COST ROBOTIC MANIPULATOR AND ITS APPLICATION TO HUMAN MOTOR CONTROL STUDIES C of the experimental results seen with more expensive systems. KEY WORDS Robotics, Manipulator, Motor Learning, a robotic planar manipulator has been used for this purpose [4] [5]. Such systems make use of direct

Moussavi, Zahra M. K.

426

Renewable Energy Planning: Multiparametric Cost Optimization; Preprint  

SciTech Connect (OSTI)

This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

Walker, A.

2008-05-01T23:59:59.000Z

427

The role of technology in reducing health care costs. Phase II and phase III.  

SciTech Connect (OSTI)

In Phase I of this project, reported in SAND97-1922, Sandia National Laboratories applied a systems approach to identifying innovative biomedical technologies with the potential to reduce U.S. health care delivery costs while maintaining care quality. The effort provided roadmaps for the development and integration of technology to meet perceived care delivery requirements and an economic analysis model for development of care pathway costs for two conditions: coronary artery disease (CAD) and benign prostatic hypertrophy (BPH). Phases II and III of this project, which are presented in this report, were directed at detailing the parameters of telemedicine that influence care delivery costs and quality. These results were used to identify and field test the communication, interoperability, and security capabilities needed for cost-effective, secure, and reliable health care via telemedicine.

Cilke, John F.; Parks, Raymond C.; Funkhouser, Donald Ray; Tebo, Michael A.; Murphy, Martin D.; Hightower, Marion Michael; Gallagher, Linda K.; Craft, Richard Layne, II; Garcia, Rudy John

2004-04-01T23:59:59.000Z

428

Costs | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on γ-Al2O3. |ID#: 19834Costs Associated WithCosts Costs

429

DSRP, direct sulfur production  

SciTech Connect (OSTI)

The objective of this work is to demonstrate on a bench-scale the Direct Sulfur Recovery Process (DSRP) for up to 99 percent or higher recovery of sulfur (as elemental sulfur) from regeneration off-gases and coal-gas produced in integrated gasification combined cycle (IGCC) power generating systems. Fundamental kinetic and thermodynamic studies will also be conducted to enable development of a model to predict DSRP performance in large-scale reactors and to shed light on the mechanism of DSRP reactions. The ultimate goal of the project is to advance the DSRP technology to the point where industry is willing to support its further development.

McMichael, W.J.; Agarwal, S.K.; Jang, B.L.; Howe, G.B. [Research Triangle Institute, Research Triangle Park, NC (United States); Chen, D.H.; Hopper, J.R. [Lamar Univ., Beaumont, TX (United States)

1993-06-01T23:59:59.000Z

430

Extension of DOE Directives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The following directives are extended until 3-18-06: DOE N 205.8, Cyber Security Requirements for Wireless Devices and Information Systems, dated 2-11-04; DOE N 205.9, Certification and Accreditation Process for Information Systems Including National Security Systems, dated 02-19-04; DOE N 205.10, Cyber Security Requirements for Risk Management, dated 02-19-04; DOE N 205.11, Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems, dated 2-19-04. DOE N 205.12, Clearing, Sanitizing, and Destroying Information System Storage Media, Memory Devices, and Other Related Hardware, dated 2-19-04.

2005-03-18T23:59:59.000Z

431

Directions to Berkeley Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: CrudeOfficeNERSCDiesel pricesDirections & Parking

432

Directions - 88-Inch Cyclotron  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The DesertDirections The Laboratory is on the hillside

433

Directions | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The DesertDirections The Laboratory is on theArea Map

434

A comparison of direct and indirect liquefaction technologies for making fluid  

E-Print Network [OSTI]

direct liquefaction conversion processes might be more energy- efficient, overall system efficiencies fuels derived from crude oil with regard to both air-pollutant and greenhouse-gas emissions, but direct at costs competitive with crude oil-derived liquid fuels. An important finding is the potential

435

Innovations in the financing of geothermal energy for direct-use applications  

SciTech Connect (OSTI)

The applications of direct use geothermal energy, its advantages, and its relative costs are examined. The following are discussed: capital needs for direct-use geothermal development, sources of geothermal financing, barriers to geothermal financing, and selected case studies of curent financing alternatives.

Kwass, P.

1981-10-01T23:59:59.000Z

436

Sixth Northwest Conservation and Electric Power Plan Chapter 8: Direct Use of Natural Gas  

E-Print Network [OSTI]

Sixth Northwest Conservation and Electric Power Plan Chapter 8: Direct Use of Natural Gas....................................................................... 1 Analysis of the Direct Use of Natural Gas for the Sixth Power Plan electricity to natural gas for residential space and water heating a lower-cost and lower-risk alternative

437

Journal of Power Sources 190 (2009) 223229 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

substantially reduce the cost of the fuel cell system. Another feature that makes the alkaline DEFC more catalyst layer on performance of alkaline direct ethanol fuel cells Y.S. Li, T.S. Zhao , Z.X. Liang direct ethanol fuel cell Anion-conducting ionomer Polymer binder Non-platinum catalyst a b s t r a c

Zhao, Tianshou

438

Direct Aerosol Forcing Uncertainty  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Understanding sources of uncertainty in aerosol direct radiative forcing (DRF), the difference in a given radiative flux component with and without aerosol, is essential to quantifying changes in Earth's radiation budget. We examine the uncertainty in DRF due to measurement uncertainty in the quantities on which it depends: aerosol optical depth, single scattering albedo, asymmetry parameter, solar geometry, and surface albedo. Direct radiative forcing at the top of the atmosphere and at the surface as well as sensitivities, the changes in DRF in response to unit changes in individual aerosol or surface properties, are calculated at three locations representing distinct aerosol types and radiative environments. The uncertainty in DRF associated with a given property is computed as the product of the sensitivity and typical measurement uncertainty in the respective aerosol or surface property. Sensitivity and uncertainty values permit estimation of total uncertainty in calculated DRF and identification of properties that most limit accuracy in estimating forcing. Total uncertainties in modeled local diurnally averaged forcing range from 0.2 to 1.3 W m-2 (42 to 20%) depending on location (from tropical to polar sites), solar zenith angle, surface reflectance, aerosol type, and aerosol optical depth. The largest contributor to total uncertainty in DRF is usually single scattering albedo; however decreasing measurement uncertainties for any property would increase accuracy in DRF. Comparison of two radiative transfer models suggests the contribution of modeling error is small compared to the total uncertainty although comparable to uncertainty arising from some individual properties.

Mccomiskey, Allison

439

Remote direct memory access  

DOE Patents [OSTI]

Methods, parallel computers, and computer program products are disclosed for remote direct memory access. Embodiments include transmitting, from an origin DMA engine on an origin compute node to a plurality target DMA engines on target compute nodes, a request to send message, the request to send message specifying a data to be transferred from the origin DMA engine to data storage on each target compute node; receiving, by each target DMA engine on each target compute node, the request to send message; preparing, by each target DMA engine, to store data according to the data storage reference and the data length, including assigning a base storage address for the data storage reference; sending, by one or more of the target DMA engines, an acknowledgment message acknowledging that all the target DMA engines are prepared to receive a data transmission from the origin DMA engine; receiving, by the origin DMA engine, the acknowledgement message from the one or more of the target DMA engines; and transferring, by the origin DMA engine, data to data storage on each of the target compute nodes according to the data storage reference using a single direct put operation.

Archer, Charles J.; Blocksome, Michael A.

2012-12-11T23:59:59.000Z

440

Calculating the Social Cost of Carbon  

E-Print Network [OSTI]

The paper1 discusses the determination of the social cost of carbon (SCC) using the PAGE2002 model used in the Stern Review. The SCC depends sensitively on assumptions about future economic development, the range and likelihood of economic...

Hope, Chris; Newbery, David

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Cost and benefit of energy efficient buildings  

E-Print Network [OSTI]

A common misconception among developers and policy-makers is that "sustainable buildings" may not be financially justified. However, this report strives to show that building green is cost-effective and does make financial ...

Zhang, Wenying, S.B. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

442

WVU Personal Rapid Transit Benefit Cost Analysis  

E-Print Network [OSTI]

WVU Personal Rapid Transit Benefit Cost Analysis Morgantown, West Virginia Prepared For: West ......................................................................... 12 Demographic Data Summary techniques suitable for assessing the impact of the WVU Personal Rapid Transit System (PRT) was employed

Mohaghegh, Shahab

443

A low cost high flux solar simulator  

E-Print Network [OSTI]

A low cost, high flux, large area solar simulator has been designed, built and characterized for the purpose of studying optical melting and light absorption behavior of molten salts. Seven 1500 W metal halide outdoor ...

Codd, Daniel S.

444

Cutting Industrial Solar System Costs in Half  

E-Print Network [OSTI]

While there are technical, social, environmental and institutional barriers to the widespread use of solar systems, the principle barrier is economic. For commercial and industrial firms to turn to this alternate energy source, the first cost must...

Niess, R. C.; Weinstein, A.

1982-01-01T23:59:59.000Z

445

Prediction markets for cost and risk assessment  

E-Print Network [OSTI]

Several temporal and political factors can sometimes limit the effectiveness of traditional methods of project tracking and cost estimation. A large organization is susceptible to internal and external risks that are ...

Aggarwal, Taroon

2011-01-01T23:59:59.000Z

446

Cost Effective Cooling Strategies for Manufacturing Facilities  

E-Print Network [OSTI]

there are many similarities. In addition to the above environmental conditions for the process/machines and workers, cost effective design of manufacturing facilities must also address maintainability, sanitation, durability, energy conservation and budgetary...

Kumar, R.

447

Dynamic Portfolio Optimization with Transaction Costs: Heuristics ...  

E-Print Network [OSTI]

Aug 10, 2010 ... With no transaction costs, the optimal investments typically depend on the investor's ... new gradient-based approach for generating penalties that exploits the ..... If the investor has a power utility function, the frictionless model ...

2011-02-03T23:59:59.000Z

448

Transaction-Cost Economics: Past and Future  

E-Print Network [OSTI]

Oliver Williamson is the founder and chief developer of transaction-cost economics (TCE). In this brief essay, on the occasion of his Nobel Memorial Prize, I offer a partial discussion of Williamson's contributions by first ...

Gibbons, Robert S.

449

Unaccounted-for gas cost allocation  

SciTech Connect (OSTI)

As competitive pressures grow, gas utility managers have stepped up their search for ways to ensure that rates remain competitive. This challenge is particularly acute in the large commercial and industrial market segments, which are most typically [open quotes]at risk.[close quotes] A variety of cost-allocation studies have been undertaken to determine more accurately what costs are associated with serving market segments, and which costs should be recovered from each. Because there are clear winners and losers in this process (at least, it is clear who wins and loses in the short term), these reallocations have been hotly debated and fiercely litigated. Any proposed change in allocation must be supported by either compelling logic or empirical evidence. This article suggests a method of reallocating the costs associated with unaccounted-for (UAF) gas volumes, based on results from two studies of the elements contributing to UAF gas.

Ozenne, D.G. (Univ. of California, Los Angeles, CA (United States))

1994-02-15T23:59:59.000Z

450

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

Well-to-wheels analysis of hydrogen based fuel-cell vehicleJP, et al. Distributed Hydrogen Fueling Systems Analysis,”Year 2006 UCD—ITS—RR—06—04 Hydrogen Refueling Station Costs

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

451

Reduce generating costs and eliminate brownouts  

SciTech Connect (OSTI)

Improving the manoeuverability of a coal-fired plant to allow it to participate in primary frequency support will reduce generation cost and minimize brownouts. The challenge is to do so without compromising efficiency or emissions. This article describes an approach - activation of stored energy - that is cost-effective and applicable to both greenfield and brownfield installations. It requires a new control philosophy, plus the correct application of new level and flow measurement 'best practices'. 4 refs., 1 tab.

Nogaja, R.; Menezes, M. [Emerson Process Management (United States)

2007-06-15T23:59:59.000Z

452

Theories on Auctions with Participation Costs  

E-Print Network [OSTI]

THEORIES ON AUCTIONS WITH PARTICIPATION COSTS A Dissertation by XIAOYONG CAO Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY August 2009 Major... Subject: Economics THEORIES ON AUCTIONS WITH PARTICIPATION COSTS A Dissertation by XIAOYONG CAO Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Approved...

Cao, Xiaoyong

2010-01-14T23:59:59.000Z

453

Polypropylene reinvented: Costs of using metallocene catalysts  

SciTech Connect (OSTI)

This study develops scoping estimates of the required capital investment and manufacturing costs to make a zirconocene catalyst/cocatalyst system [(F{sub 6}-acen)Zr(CH{sub 2}CMe{sub 3})(NMe{sub 2}Ph)][B(C{sub 6}F{sub 5}){sub 4}] immobilized on a silica support. Costs for this fluorine-based system are compared with estimates for two other metallocene catalysts using methylaluminoxane (MAO)-based cocatalysts. Including wt of support and cocatalyst, each of the production facilities for making the 3 zirconocene catalyst systems is sized at 364--484 tonnes/year. Cost to make the F-based catalyst system is estimated to be $10780/kg, assuming 20% return on capital invested. Costs for the two MAO-based catalyst system fall in the range of $10950--12160/kg, assuming same return. Within the {plus_minus}50% accuracy of these estimates, these differences are not significant. Given a catalyst productivity of 250 kg resin/gram zirconocene, the cost contribution in the finished ethylene-propylene copolymer resin is 4.4 cents/kg, excluding selling, administrative, research costs.

Brockmeier, N.F.

1996-05-01T23:59:59.000Z

454

Expanding the role of the cost engineer  

SciTech Connect (OSTI)

There have been many questions about the costs of providing medical services. These questions have resulted in the development of Resource-Based Relative Values Scale (RBRVS) at the national level. Policymakers view RBRVS as a potential tool to pay physicians. The questions, about the cost of operations of HSE-2 at Los Alamos National Laboratory, revolve around doing routine occupation health physicals for the Laboratory. Generally, these questions are concerned about why the costs appear to be high relative to what private physician suggests the costs should be. There is also an interest in trying to find methods to reduce these costs if possible. Many of the tools developed to help in construction estimating can be applied to estimating medical costs. With the need to perform many thousands of physicals each year the saving of even a few dollars for each exam can quickly add up to a large saving. There are a number of different types of physicals and different levels; based on age, sex, type of work, and years since last physical. The LANL Health Services are housed in a 12,600 square foot building close to the population center of the Laboratory Health Services, produced by a staff of seven physicians and approximately 25 support personnel, include acute medical care, routine surveillance exams, and preventive medicine programs. This paper will consider the routine surveillance exams, which constitute the major activity of the medical staff, in terms of time and dollars expended.

Stutz, R.A.; Shaw, R.F.

1989-01-01T23:59:59.000Z

455

Reformulated gasoline: Costs and refinery impacts  

SciTech Connect (OSTI)

Studies of reformulated gasoline (RFG) costs and refinery impacts have been performed with the Oak Ridge National Laboratory Refinery Yield Model (ORNL-RYM), a linear program which has been updated to blend gasolines to satisfy emissions constraints defined by preliminary complex emissions models. Policy makers may use the reformulation cost knee (the point at which costs start to rise sharply for incremental emissions control) to set emissions reduction targets, giving due consideration to the differences between model representations and actual refining operations. ORNL-RYM estimates that the reformulation cost knee for the US East Coast (PADD I) is about 15.2 cents per gallon with a 30 percent reduction of volatile organic compounds (VOCs). The estimated cost knee for the US Gulf Coast (PADD III) is about 5.5 cents per gallon with a VOC reduction of 35 percent. Reid vapor pressure (RVP) reduction is the dominant VOC reduction mechanism. Even with anti-dumping constraints, conventional gasoline appears to be an important sink which permits RFG to be blended with lower aromatics and sulfur contents in PADD III. In addition to the potentially large sensitivity of RFG production to different emissions models, RFG production is sensitive to the non-exhaust VOC share assumption for a particular VOC model. ORNL-RYM has also been used to estimate the sensitivity of RFG production to the cost of capital; to the RVP requirements for conventional gasoline; and to the percentage of RFG produced in a refining region.

Hadder, G.R.

1994-02-01T23:59:59.000Z

456

The Impact of Delegating Decision Making to IT on the Sunk Cost Effect  

E-Print Network [OSTI]

In this research, we investigate the impact of delegating decision making to information technology (IT) on an important human decision bias - the sunk cost effect. To address our research question, we use a unique and very rich dataset provided by an auction website containing actual market transaction data for approximately 7,000 pay-per-bid auctions. We analyze direct buy decisions of auction participants who did not plan to exercise the direct buy option prior to the beginning of the auction, but who, after failing to win the auction, did buy the product directly because of their normatively irrelevant sunk investments. Not surprisingly, participants with a higher monetary investment have an increased likelihood of violating the assumption of rationality due to the sunk cost effect. Interestingly, after controlling for monetary investments, participants who delegate their decision making to IT and, consequently, have comparably lower behavioral investments (e.g., emotional attachment, effort, time) are le...

Herrmann, Philipp N; Rahman, Mohammad S

2011-01-01T23:59:59.000Z

457

Conclusions and Policy Directions,  

SciTech Connect (OSTI)

This chapter briefly revisits the constraints and opportunities of mitigation and adaptation, and highlights and the multiple linkages, synergies and trade-offs between mitigation, adaptation and urban development. The chapter then presents future policy directions, focusing on local, national and international principles and policies for supporting and enhancing urban responses to climate change. In summary, policy directions for linking climate change responses with urban development offer abundant opportunities; but they call for new philosophies about how to think about the future and how to connect different roles of different levels of government and different parts of the urban community. In many cases, this implies changes in how urban areas operate - fostering closer coordination between local governments and local economic institutions, and building new connections between central power structures and parts of the population who have often been kept outside of the circle of consultation and discourse. The difficulties involved in changing deeply set patterns of interaction and decision-making in urban areas should not be underestimated. Because it is so difficult, successful experiences need to be identified, described and widely publicized as models for others. However, where this challenge is met, it is likely not only to increase opportunities and reduce threats to urban development in profoundly important ways, but to make the urban area a more effective socio-political entity, in general - a better city in how it works day to day and how it solves a myriad of problems as they emerge - far beyond climate change connections alone. It is in this sense that climate change responses can be catalysts for socially inclusive, economically productive and environmentally friendly urban development, helping to pioneer new patterns of stakeholder communication and participation.

Wilbanks, Thomas J [ORNL; Romero-Lankao, Paty [National Center for Atmospheric Research (NCAR); Gnatz, P [National Center for Atmospheric Research (NCAR)

2011-01-01T23:59:59.000Z

458

Operating Costs for Trucks David Levinson*, Michael Corbett, Maryam Hashami  

E-Print Network [OSTI]

Author Abstract This study estimates the operating costs for commercial vehicle operators in Minnesota, but variable costs change with the level of output. Daniels (1974) divided vehicle operating cost into two different categories, running costs (includes fuel consumption, engine oil consumption, tire costs

Levinson, David M.

459

RETI Resource Valuation Methodology Cost of Generation Calculator  

E-Print Network [OSTI]

) · Cost of equity investment in capital · Cost of financing capital · Taxes, including investmentRETI Resource Valuation Methodology Cost of Generation Calculator The Cost of Generation Calculator determines the levelized cost of generating power over the life of the resource, and is an input

460

Past and Future Cost of Wind Energy: Preprint  

SciTech Connect (OSTI)

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions.

Lantz, E.; Hand, M.; Wiser, R.

2012-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Economic impacts of oil spills: Spill unit costs for tankers, pipelines, refineries, and offshore facilities. [Task 1, Final report  

SciTech Connect (OSTI)

The impacts of oil spills -- ranging from the large, widely publicized Exxon Valdez tanker incident to smaller pipeline and refinery spills -- have been costly to both the oil industry and the public. For example, the estimated costs to Exxon of the Valdez tanker spill are on the order of $4 billion, including $2.8 billion (in 1993 dollars) for direct cleanup costs and $1.125 billion (in 1992 dollars) for settlement of damages claims caused by the spill. Application of contingent valuation costs and civil lawsuits pending in the State of Alaska could raise these costs appreciably. Even the costs of the much smaller 1991 oil spill at Texaco`s refinery near Anacortes, Washington led to costs of $8 to 9 million. As a result, inexpensive waming, response and remediation technologies could lower oil spin costs, helping both the oil industry, the associated marine industries, and the environment. One means for reducing the impact and costs of oil spills is to undertake research and development on key aspects of the oil spill prevention, warming, and response and remediation systems. To target these funds to their best use, it is important to have sound data on the nature and size of spills, their likely occurrence and their unit costs. This information could then allow scarce R&D dollars to be spent on areas and activities having the largest impact. This report is intended to provide the ``unit cost`` portion of this crucial information. The report examines the three key components of the US oil supply system, namely, tankers and barges; pipelines and refineries; and offshore production facilities. The specific purpose of the study was to establish the unit costs of oil spills. By manipulating this key information into a larger matrix that includes the size and frequency of occurrence of oil spills, it will be possible` to estimate the likely future impacts, costs, and sources of oil spills.

Not Available

1993-10-15T23:59:59.000Z

462

Rank and directional entropy Rank and directional entropy  

E-Print Network [OSTI]

Rank and directional entropy Rank and directional entropy E. Arthur (Robbie) Robinson (Joint work with Ayse Sahin) The George Washington University Talk at KIAS, Seoul, Korea. September 27, 2010 #12;Rank and directional entropy Outline 1 Introduction 2 Finite rank, Z case 3 The formal definition 4 The Z2 case 5

Robinson Jr., E. Arthur (Robbie)

463

Cost update technology, safety, and costs of decommissioning a reference uranium hexafluoride conversion plant  

SciTech Connect (OSTI)

The purpose of this study is to update the cost estimates developed in a previous report, NUREG/CR-1757 (Elder 1980) for decommissioning a reference uranium hexafluoride conversion plant from the original mid-1981 dollars to values representative of January 1993. The cost updates were performed by using escalation factors derived from cost index trends over the past 11.5 years. Contemporary price quotes wee used for costs that have increased drastically or for which is is difficult to find a cost trend. No changes were made in the decommissioning procedures or cost element requirements assumed in NUREG/CR-1757. This report includes only information that was changed from NUREG/CR-1757. Thus, for those interested in detailed descriptions and associated information for the reference uranium hexafluoride conversion plant, a copy of NUREG/CR-1757 will be needed.

Miles, T.L.; Liu, Y.

1995-08-01T23:59:59.000Z

464

U.S. Geographic Analysis of the Cost of Hydrogen from Electrolysis  

SciTech Connect (OSTI)

This report summarizes U.S. geographic analysis of the cost of hydrogen from electrolysis. Wind-based water electrolysis represents a viable path to renewably-produced hydrogen production. It might be used for hydrogen-based transportation fuels, energy storage to augment electricity grid services, or as a supplement for other industrial hydrogen uses. This analysis focuses on the levelized production, costs of producing green hydrogen, rather than market prices which would require more extensive knowledge of an hourly or daily hydrogen market. However, the costs of hydrogen presented here do include a small profit from an internal rate of return on the system. The cost of renewable wind-based hydrogen production is very sensitive to the cost of the wind electricity. Using differently priced grid electricity to supplement the system had only a small effect on the cost of hydrogen; because wind electricity was always used either directly or indirectly to fully generate the hydrogen. Wind classes 3-6 across the U.S. were examined and the costs of hydrogen ranged from $3.74kg to $5.86/kg. These costs do not quite meet the 2015 DOE targets for central or distributed hydrogen production ($3.10/kg and $3.70/kg, respectively), so more work is needed on reducing the cost of wind electricity and the electrolyzers. If the PTC and ITC are claimed, however, many of the sites will meet both targets. For a subset of distributed refueling stations where there is also inexpensive, open space nearby this could be an alternative to central hydrogen production and distribution.

Saur, G.; Ainscough, C.

2011-12-01T23:59:59.000Z

465

A fast direct numerical simulation method for characterising hydraulic roughness  

E-Print Network [OSTI]

We describe a fast direct numerical simulation (DNS) method that promises to directly characterise the hydraulic roughness of any given rough surface, from the hydraulically smooth to the fully rough regime. The method circumvents the unfavourable computational cost associated with simulating high-Reynolds-number flows by employing minimal-span channels (Jimenez & Moin 1991). Proof-of-concept simulations demonstrate that flows in minimal-span channels are sufficient for capturing the downward velocity shift, that is, the Hama roughness function, predicted by flows in full-span channels. We consider two sets of simulations, first with modelled roughness imposed by body forces, and second with explicit roughness described by roughness-conforming grids. Owing to the minimal cost, we are able to conduct DNSs with increasing roughness Reynolds numbers while maintaining a fixed blockage ratio, as is typical in full-scale applications. The present method promises a practical, fast and accurate tool for character...

Chung, Daniel; MacDonald, Michael; Hutchins, Nicholas; Ooi, Andrew

2015-01-01T23:59:59.000Z

466

Journal of Power Sources 196 (2011) 18021807 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

An anion-exchange membrane direct ethanol fuel cell (AEM DEFC) that uses a low-cost AEM, rather than a proton-exchange membrane (PEM), for direct methanol fuel cells (DMFCs), makes it possible to achieve on performance of anion-exchange membrane direct ethanol fuel cells Y.S. Li, T.S. Zhao , J.B. Xu, S.Y. Shen, W

Zhao, Tianshou

467

Advanced progress concepts for direct coal liquefaction  

SciTech Connect (OSTI)

Given the low cost of petroleum crude, direct coal liquefaction is still not an economically viable process. The DOE objectives are to further reduce the cost of coal liquefaction to a more competitive level. In this project the primary focus is on the use of low-rank coal feedstocks. A particular strength is the use of process-derived liquids rather than model compound solvents. The original concepts are illustrated in Figure 1, where they are shown on a schematic of the Wilsonville pilot plant operation. Wilsonville operating data have been used to define a base case scenario using run {number_sign}263J, and Wilsonville process materials have been used in experimental work. The CAER has investigated: low severity CO pretreatment of coal for oxygen rejection, increasing coal reactivity and mg inhibiting the propensity for regressive reactions; the application of more active. Low-cost Fe and Mo dispersed catalysts; and the possible use of fluid coking for solids rejection and to generate an overhead product for recycle. CONSOL has investigated: oil agglomeration for coal ash rejection, for the possible rejection of ash in the recycled resid, and for catalyst addition and recovery; and distillate dewaxing to remove naphthenes and paraffins, and to generate an improved quality feed for recycle distillate hydrogenation. At Sandia, research has been concerned with the production of active hydrogen donor distillate solvent fractions produced by the hydrogenation of dewaxed distillates and by fluid coking via low severity reaction with H{sub 2}/CO/H{sub 2}O mixtures using hydrous metal oxide and other catalysts.

Anderson, R.; Derbyshire, F.; Givens, E. [Univ. of Kentucky Center for Applied Energy Research, Lexington, KY (United States)] [and others

1995-09-01T23:59:59.000Z

468

Cost Sharing Granting agencies may require the University to bear some of the costs of a sponsored project,  

E-Print Network [OSTI]

and cost sharing funds should be spent at about the same rate throughout the project: for example, when 10 of project costs will normally be transferred from the grant FOP to the cost sharing FOP. Granting agencies charged to the sponsored FOP or to a cost sharing FOP for that project. Methods of Cost Sharing 1. Cash

Tam, Tin-Yau

469

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network [OSTI]

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process...

Lucas, Matthew Allen

2009-05-15T23:59:59.000Z

470

Comparative Analysis of the Cost Models Used for Estimating Renovation Costs of Universities in Texas  

E-Print Network [OSTI]

the cost of renovation, ease of use and speed of the model are some of the other factors that practitioners look for in a cost model (Yokum and Armstrong. 1995). This research aims to identify the merits and demerits of the cost models based on not only... Researchers believe that accuracy is the main criterion for selecting the best cost model; however, a survey done by Yokum and Armstrong in 1995 shows that ease of interpretation, ease of use, ease in getting data, credibility, and speed top the list...

Faquih, Yaquta Fakhruddin

2010-10-12T23:59:59.000Z

471

 Underfloor air distribution (UFAD) cost study: analysis of first cost tradeoffs in UFAD systems  

E-Print Network [OSTI]

is served by VAV fan coil units (FCU) with variable speedwith regard to terminal fan coil unit costs. Since the model

Webster, Tom; Benedek, Corinne; Bauman, Fred

2006-01-01T23:59:59.000Z

472

Evidence of cost growth under cost-plus and fixed-price contracting  

SciTech Connect (OSTI)

As defined by the US Department of Energy (DOE), privatization refers to a shifting of responsibilities for the completion of projects from a cost-plus Management and Operations (M and O) contract, to incentive-based contracts with the private sector. DOE`s new vision is to arrange cleanup work around incentives-based contracts, which are won via competitive bidding. Competition in awarding cleanup contracts can make use of market incentives to lower project costs and reduce slippage time. Fixed-price contracts encourage contractors to minimize schedule delays and cost overruns once the scope of a project has been negotiated. Conversely, cost-plus contracting offers weak incentives for contractors to select cost-minimizing production and management approaches. Because privatization explicitly allocates more risk to the contractor, it forces the government to better define its goals and methods. This study summarizes actual cost experiences with government contracts performed under cost-plus and fixed-price incentive structures at all levels of government. The first section provides some background on the problem of making contractor activity more cost-efficient. Following this are sections on the measurement of performance and the costs of projects, limitations on measurement, and findings of similar studies. The study concludes with appendices discussing the details of the performance measurement methodology and the project data sets used in the study.

Scott, M.J.; Paananaen, O.H.; Redgate, T.E.; Ulibarri, C.A.; Jaksch, J.A.

1998-09-01T23:59:59.000Z

473

Geothermal direct heat applications program summary  

SciTech Connect (OSTI)

In 1978, the Department of Energy Division of Geothermal and Hydropower Technologies initiated a program to accelerate the direct use of geothermal energy, in which 23 projects were selected. The projects, all in the western part of the US, cover the use of geothermal energy for space conditioning (heating and cooling) and agriculture (aquaculture and greenhouses). Initially, two projects were slated for industrial processing; however, because of lack of geothermal resources, these projects were terminated. Of the 23 projects, seven were successfully completed, ten are scheduled for completion by the end of 1983, and six were terminated for lack of resources. Each of the projects is being documented from its inception through planning, drilling, and resource confirmation, design, construction, and one year of monitoring. The information is being collected, evaluated, and will be reported. Several reports will be produced, including detailed topical reports on economics, institutional and regulatory problems, engineering, and a summary final report. To monitor progress and provide a forum for exchange of information while the program is progressing, semiannual or annual review meetings have been held with all project directors and lead engineers for the past four years. This is the sixth meeting in that series. Several of the projects which have been terminated are not included this year. Overall, the program has been very successful. Valuable information has been gathered. problems have been encountered and resolved concerning technical, regulatory, and institutional constraints. Most projects have been proven to be economical with acceptable pay-back periods. Although some technical problems have emerged, they were resolved with existing off-the-shelf technologies and equipment. The risks involved in drilling for the resource, the regulatory constraints, the high cost of finance, and large front-end cost remain the key obstacles to the broad development of geothermal direct use applications.

None

1982-08-01T23:59:59.000Z

474

Selective Reporting and the Social Cost of Carbon  

E-Print Network [OSTI]

estimating the social cost of carbon. meta-analysis.cz/scc.Formula for the Social Cost of Carbon. ” Working PaperP. Watkiss (2005): “Social Cost of Carbon: A Closer Look at

Havranek, Tomas; Irsova, Zuzana; Janda, Karel; Zilberman, David

2014-01-01T23:59:59.000Z

475

The costs of environmental regulation in a concentrated industry  

E-Print Network [OSTI]

The typical cost analysis of an environmental regulation consists of an engineering estimate of the compliance costs. In industries where fixed costs are an important determinant of market structure this static analysis ...

Ryan, Stephen

2005-01-01T23:59:59.000Z

476

Development of Low-Cost, High Strength Commercial Textile Precursor...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

a project to develop develop a low-cost precursor fiber that can be converted to low-cost carbon fiber (CF) with at least 650 ksi tensile strength. Development of Low-Cost, High...

477

Including costs of supply chain risk in strategic sourcing decisions  

E-Print Network [OSTI]

Cost evaluations do not always include the costs associated with risks when organizations make strategic sourcing decisions. This research was conducted to establish and quantify the impact of risks and risk-related costs ...

Jain, Avani

2009-01-01T23:59:59.000Z

478

Improved supplier selection and cost management for globalized automotive production  

E-Print Network [OSTI]

For many manufacturing and automotive companies, traditional sourcing decisions rely on total landed cost models to determine the cheapest supplier. Total landed cost models calculate the cost to purchase a part plus all ...

Franken, Joseph P., II (Joseph Philip)

2012-01-01T23:59:59.000Z

479

The Costs of Environmental Regulation in a Concentrated Industry  

E-Print Network [OSTI]

The typical cost analysis of an environmental regulation consists of an engineering estimate of the compliance costs. In industries where fixed costs are an important determinant of market structure, this static analysis ...

Ryan, Stephen

480

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

upon fuel cell stack performance, catalyst cost, stackin 2025, the fuel cell system cost (stack and BOP) is aboutaffect the cost of fuel cell stack. In a recent report by

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "direct costs incurred" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Do You Have Adequate Staffing to Keep Costs Under Control?  

E-Print Network [OSTI]

Competitive pressures have forced companies to seek reduced costs through reduced staffing. The emphasis has been on fixed cost control at the expense of some loss in variable cost control. Restructuring through reduced staffing has some pitfalls...

Mergens, E. H.

482

External Costs of Transport in the U.S.  

E-Print Network [OSTI]

been quantified. Energy security/oil-importing costs BriefEstimates of energy-security/oil-importing costs by mode (et al. , 2008). Oil-importing “energy-security” costs have

Delucchi, Mark A.; McCubbin, Donald R.

2010-01-01T23:59:59.000Z

483

Societal lifetime cost of hydrogen fuel cell vehicles  

E-Print Network [OSTI]

Fuel-cell system cost estimate Fuel cell performance andsignificantly affect the cost of fuel cell stack. In aTo estimate how the costs of fuel-cell system components

Sun, Yongling; Ogden, J; Delucchi, Mark

2010-01-01T23:59:59.000Z

484

Cost-Effective Industrial Boiler Plant Efficiency Advancements  

E-Print Network [OSTI]

Natural gas and electricity are expensive to the extent that annual fuel and power costs can approach the initial cost of an industrial boiler plant. Within this context, this paper examines several cost-effective efficiency advancements that were...

Fiorino, D. P.

485

Determining the lowest-cost hydrogen delivery mode  

E-Print Network [OSTI]

liquid hydrogen pumps cost less than compressors. Further,hydrogen ?ow rate, though there are slight economies of scale associated with compressor cost.hydrogen storage tanks are needed. Costs for central plant compressors

Yang, Christopher; Ogden, Joan M

2007-01-01T23:59:59.000Z

486

Bioenergy Technologies Office New Directions  

Broader source: Energy.gov [DOE]

New Directions and New Business Opportunities for BETO Valerie Reed, Acting Director, BETO, U.S. Department of Energy

487

Report on the Savannah River Site aluminum-based spent nuclear fuel alternatives cost study  

SciTech Connect (OSTI)

Initial estimates of costs for the interim management and disposal of aluminum-based spent nuclear fuel (SNF) were developed during preparation of the Environmental Impact Statement (EIS) on the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel. The Task Team evaluated multiple alternatives, assessing programmatic, technical, and schedule risks, and generated life-cycle cost projections for each alternative. The eight technology alternatives evaluated were: direct co-disposal; melt and dilute; reprocessing; press and dilute; glass material oxidation dissolution system (GMODS); electrometallurgical treatment; dissolve and vitrify; and plasma arc. In followup to the Business Plan that was developed to look at SNF dry storage, WSRC prepared an addendum to the cost study. This addendum estimated the costs for the modification and use of an existing (105L) reactor facility versus a greenfield approach for new facilities (for the Direct Co-Disposal and Melt and Dilute alternatives). WSRC assessed the impacts of a delay in reprocessing due to the potential reservation of H-Canyon for other missions (i.e., down blending HEU for commercial use or the conversion of plutonium to either MOX fuel or an immobilized repository disposal form). This report presents the relevant results from these WSRC cost studies, consistent with the most recent project policy, technology implementation, canyon utilization, and inventory assumptions. As this is a summary report, detailed information on the technical alternatives or the cost assumptions raised in each of the above-mentioned cost studies is not provided. A comparison table that briefly describes the bases used for the WSRC analyses is included as Appendix A.

NONE

1998-12-01T23:59:59.000Z

488

Low-Cost Spectral Sensor Development Description.  

SciTech Connect (OSTI)

Solar spectral data for all parts of the US is limited due in part to the high cost of commercial spectrometers. Solar spectral information is necessary for accurate photovoltaic (PV) performance forecasting, especially for large utility-scale PV installations. A low-cost solar spectral sensor would address the obstacles and needs. In this report, a novel low-cost, discrete- band sensor device, comprised of five narrow-band sensors, is described. The hardware is comprised of commercial-off-the-shelf components to keep the cost low. Data processing algorithms were developed and are being refined for robustness. PV module short-circuit current ( I sc ) prediction methods were developed based on interaction-terms regression methodology and spectrum reconstruction methodology for computing I sc . The results suggest the computed spectrum using the reconstruction method agreed well with the measured spectrum from the wide-band spectrometer (RMS error of 38.2 W/m 2 -nm). Further analysis of computed I sc found a close correspondence of 0.05 A RMS error. The goal is for ubiquitous adoption of the low-cost spectral sensor in solar PV and other applications such as weather forecasting.

Armijo, Kenneth Miguel; Yellowhair, Julius

2014-11-01T23:59:59.000Z

489

Cofinal types of directed orders  

E-Print Network [OSTI]

, ) directed partial orders #12;Cofinal types (P, ), (Q, ) directed partial orders Tukey reducibility: (P orders Tukey reducibility: (P, ) T (Q, ) if f : P Q X P unbounded = f [X] Q unbounded g : Q P Y Q cofinal = g[Y ] P cofinal #12;Cofinal types (P, ), (Q, ) directed partial orders Tukey reducibility: (P

Mátrai, Tamás

490

The Cost of Power Disturbances to Industrial & Digital Economy Companies  

E-Print Network [OSTI]

-4: Average Cost Per Outage by Annual kWh and Duration 2-5 Figure 2-5: Average Cost Per Outage for DE by Data-5: Average Annual Per Establishment Cost of Outages by Annual kWh 3-6 Figure 3-6: Aggregate Annual Cost-4: Average Annual Per Establishment Cost of PQ Problems by Annual kWh 4-4 Figure 4-5: Aggregate Annual Cost

Schrijver, Karel

491

A cost-benefit approach to youth vocational training schemes in Africa  

E-Print Network [OSTI]

) December 1974 ABSTRACT A COST-BENEFIT APPROACH TO YOUTH VOCATIONAL TRAINING SCHENES IN AFRICA. (December 1974) Emmanuel Bol Kuanyin, B. Sc. (Honours). Un1- verity of Khartoum, Sudan. Directed by: Dr. Alan Rufus Waters The objective of this thesis... is the construct1on of an analytical framework for the evaluation of benef1ts and costs of youth vocational train1ng schemes in Africa. After the discussion of the role of human capital in economic development and the problems of its accumu lat1on in Africa...

Kuanyin, Emmanuel Bol

1974-01-01T23:59:59.000Z

492

Investigation of regulatory efficiency with reference to the EU Water Framework Directive: an application to Scottish agriculture   

E-Print Network [OSTI]

The Water Framework Directive (WFD) has the stated objective of delivering good status (GS) for Europe’s surface waters and groundwaters. But meeting GS is cost dependent, and in some water bodies pollution abatement ...

Lago Aresti, Manuel

2009-01-01T23:59:59.000Z

493

Cryo-Compressed Hydrogen Storage: Performance and Cost Review...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Compressed Hydrogen Storage: Performance and Cost Review Cryo-Compressed Hydrogen Storage: Performance and Cost Review Presented at the R&D Strategies for Compressed,...

494

2013 Hydrogen Compression, Storage, and Dispensing Cost Reduction...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Final Report 2013 Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Final Report...

495

Hydrogen Storage in Wind Turbine Towers: Cost Analysis and Conceptual...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

in Wind Turbine Towers: Cost Analysis and Conceptual Design Hydrogen Storage in Wind Turbine Towers: Cost Analysis and Conceptual Design Preprint 34851.pdf More Documents &...

496

Energy Department Invests to Drive Down Costs of Carbon Capture...  

Energy Savers [EERE]

Invests to Drive Down Costs of Carbon Capture, Support Reductions in Greenhouse Gas Pollution Energy Department Invests to Drive Down Costs of Carbon Capture, Support Reductions...

497

Integrated Design and Manufacturing of Cost-Effective & Industrial...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Cost-Effective & Industrial-Scalable TEG for Vehicle Applications Integrated Design and Manufacturing of Cost-Effective & Industrial-Scalable TEG for Vehicle Applications...

498

Cost Effectiveness of Technology Solutions for Future Vehicle...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Cost Effectiveness of Technology Solutions for Future Vehicle Systems Cost Effectiveness of Technology Solutions for Future Vehicle Systems Explores the economics of CO2 emission...

499

A Low-Cost Continuous Emissions Monitoring System for Mobile...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A Low-Cost Continuous Emissions Monitoring System for Mobile and Stationary Engine SCRDPF ApplicationsData-Logger for Vehicle Data Acquisition A Low-Cost Continuous Emissions...

500

The Practice of Cost Benefit Analysis in the Transport Sector...  

Open Energy Info (EERE)

Practice of Cost Benefit Analysis in the Transport Sector a Mexican Perspective Jump to: navigation, search Tool Summary LAUNCH TOOL Name: The Practice of Cost Benefit Analysis in...