Powered by Deep Web Technologies
Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS  

SciTech Connect (OSTI)

The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best manage lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.

Lobdell, D.; Geimer, R.; Larsen, P.; Loveland, K.

2003-02-27T23:59:59.000Z

2

Local Option - Special Assessment of Wind Energy Devices | Department of  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Special Assessment of Wind Energy Devices Local Option - Special Assessment of Wind Energy Devices Local Option - Special Assessment of Wind Energy Devices < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Wind Buying & Making Electricity Program Info Start Date 01/01/1994 State Iowa Program Type Property Tax Incentive Rebate Amount Property valued at 0% of the net acquisition cost in the first assessment year, increasing annually by 5 percentage points to a maximum of 30% of the net acquisition cost in the 7th and succeeding years Provider Iowa Department of Revenue Any city or county in Iowa may pass an ordinance assessing wind energy conversion equipment at a special valuation for property tax purposes, beginning at 0% of the net acquisition cost in the first assessment year

3

Haptic overlay device for flat panel touch displays  

Science Journals Connector (OSTI)

In an effort to present users with an increasing amount of information, many industries including automotive and aerospace are adopting flat panel touch displays as a user interface. These interfaces are becoming popular due to their reconfigurability ...

David Wang; Kevin Tuer; Mauro Rossi; Joseph Shu

2004-03-01T23:59:59.000Z

4

A rational approach for evaluation and screening of treatment and disposal options for the solar pond sludges at Rocky Flats  

SciTech Connect (OSTI)

This document consists of information about the treatment options for the sludge that is located in the evaporation ponds at the Rocky Flats Plant. The sludges are mixed low-level radioactive wastes whose composition and character were variable. Sludges similar to these are typically treated prior to ultimate disposal. Disposal of treated sludges includes both on-site and off-site options. The rational approach described in this paper is useful for technology evaluation and screening because it provides a format for developing objectives, listing alternatives, and weighing the alternatives against the objectives and against each other.

Dickerson, K.S.

1995-12-31T23:59:59.000Z

5

A decision analysis method for selection of waste minimization process options for TRU mixed material at Rocky Flats  

SciTech Connect (OSTI)

When plutonium production operations were halted at the Rocky Flats Plant, there remained a volume of material that was retained in order that its plutonium content could be reclaimed. This material, known as residue, is transuranic and mixed transuranic material with a plutonium content above what was called the ``economic discard limit,`` or EDL. The EDL was defined in terms of each type of residue material, and each type of material is given an Item Description Code, or IDC. Residue IDCs have been grouped into general category descriptions which include plutonium (Pu) nitrate solutions, Pu chloride solutions, salts, ash, metal, filters, combustibles, graphite, crucibles, glass, resins, gloves, firebrick, and sludges. Similar material exists both below and above the EDL, with material with the (previous) economic potential for reclamation of plutonium classified as residue.

Williams, R.E.; Dustin, D.F.

1994-02-01T23:59:59.000Z

6

Flat panel ferroelectric electron emission display system  

DOE Patents [OSTI]

A device which can produce a bright, raster scanned or non-raster scanned image from a flat panel. Unlike many flat panel technologies, this device does not require ambient light or auxiliary illumination for viewing the image. Rather, this device relies on electrons emitted from a ferroelectric emitter impinging on a phosphor. This device takes advantage of a new electron emitter technology which emits electrons with significant kinetic energy and beam current density.

Sampayan, Stephen E. (Manteca, CA); Orvis, William J. (Livermore, CA); Caporaso, George J. (Livermore, CA); Wieskamp, Ted F. (Livermore, CA)

1996-01-01T23:59:59.000Z

7

Flat | Open Energy Information  

Open Energy Info (EERE)

Flat Flat Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Flat Dictionary.png Flat: A relatively smooth landscape with no topographic relief Other definitions:Wikipedia Reegle Topographic Features List of topographic features commonly encountered in geothermal resource areas: Mountainous Horst and Graben Shield Volcano Flat Lava Dome Stratovolcano Cinder Cone Caldera Depression Resurgent Dome Complex The North Brawley Geothermal Power Plant is located in the Imperial Valley, California, a broad valley with flat topographic features. http://www.pcl.com/Projects-that-Inspire/Pages/North-Brawley-Geothermal-Power-Plant.aspx# Flat terrains are characterized by the absence of major topographic features. Flat topography is typically encountered in areas that have

8

Financing Options  

Broader source: Energy.gov [DOE]

A growing variety of options are available for financing an LED street lighting replacement program. One or another approach may be preferable based on the system ownership and maintenance model in...

9

Diesel prices flat  

U.S. Energy Information Administration (EIA) Indexed Site

Diesel prices flat The U.S. average retail price for on-highway diesel fuel saw no movement from last week. Prices remained flat at 3.89 a gallon on Monday, based on the weekly...

10

Connector device for building integrated photovoltaic device  

SciTech Connect (OSTI)

The present invention is premised upon a connector device and method that can more easily electrically connect a plurality of PV devices or photovoltaic system components and/or locate these devices/components upon a building structure. It also may optionally provide some additional sub-components (e.g. at least one bypass diode and/or an indicator means) and may enhance the serviceability of the device.

Keenihan, James R.; Langmaid, Joseph A.; Eurich, Gerald K.; Lesniak, Michael J.; Mazor, Michael H.; Cleereman, Robert J.; Gaston, Ryan S.

2014-06-03T23:59:59.000Z

11

Rocky flats teams forming  

SciTech Connect (OSTI)

Bidding teams are shaping up to go after the $3.5-billion, five-year contract to manage ongoing operations and cleanup of the US Dept. of Energy`s Rocky Flats nuclear weapon plant near Denver.

NONE

1994-08-01T23:59:59.000Z

12

Cleanup at Rocky Flats  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

David L. Clark, Los Alamos National Laboratory David L. Clark, Los Alamos National Laboratory The Rocky Flats Environmental Technology Site (RFETS) is an environmental cleanup site located about 16 miles northwest of downtown Denver (Fig 1). Two decades of routine monitoring have shown that the environment around RFETS is contaminated with actinide elements (U, Pu, Am) from site operations, [1] and RFETS has been designated by the U.S. Environmental Protection Agency (EPA) as a Superfund cleanup site. Until December 1989, the Rocky Flats Plant made components for nuclear weapons using various radioactive and hazardous materials, including plutonium, uranium and beryllium. Nearly 40 years of nuclear weapons production left behind a legacy of contaminated facilities, soils, and ground water. More than 2.5 million people live within a 50 mile radius of the site; 300,000 of those live in the Rocky Flats watershed.

13

The Theoryof Maximally Flat  

E-Print Network [OSTI]

TRANSACTIONSON AUDIO AND ELECTROACOUSTICS, VOL. AU-20, NO. 3, AUGUST 1972 dynamic drag of the voice coil be made as flat as thedesigner'sconstraints permit. II. Theory Let the dc resistance of the voice coil, rl the mechanical re- sistance of the cone suspension, and SIthe suspension stiff- ness or spring

California at Berkeley, University of

14

Maryland Efficiency Program Options  

Broader source: Energy.gov [DOE]

Maryland Efficiency Program Options, from the Tool Kit Framework: Small Town University Energy Program (STEP).

15

STEP Participant Financing Options  

Broader source: Energy.gov [DOE]

STEP Participant Financing Options, from the Tool Kit Framework: Small Town University Energy Program (STEP).

16

Flat Oval Spiral Duct Deflection  

E-Print Network [OSTI]

(c) 20 Gauge and 48 inch Flat Span (d) 24 Gauge and 6 inch Flat Span (e) 24 Gauge and 14 inch Flat Span (f) 26 Gauge and 25 inch Flat Span Figure 7.2.: Unreinforced Positive 35 (g) (cont.) 18 Gauge and 63 inch Flat Span (h) (cont.) 20 Gauge and 14.... [18] Ducts can be used in many applications some; applications might be high temperature or even corrosive or abrasive. Ducts are generally used in industrial ventilation, air pollution, and dust collecting systems. Metals can corrode from chemicals...

Daugherty, Matthew

2014-03-10T23:59:59.000Z

17

OPTIONS for ENERGY EFFICIENCY  

E-Print Network [OSTI]

OPTIONS for ENERGY EFFICIENCY in EXISTING BUILDINGS December 2005 CEC-400-2005-039-CMF;OPTIONS FOR ENERGY EFFICIENCY in EXISTING BUILDINGS COMMISSION REPORT TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................iii California's Successful Energy Efficiency Programs

18

Enforcement Letter - Rocky Flats  

Broader source: Energy.gov (indexed) [DOE]

1, 2000 1, 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to an evaluation by the Department of Energy (DOE) of noncompliance report number NTS-RFO--KHLL-SITEWIDE-2000-0005, which describes noncompliances with the design and procurement requirements of 10 CFR 830.120 (Quality Assurance Rule). 10 CFR 830.120(c)(2)(iii) requires that procured items and services shall meet established requirements and perform as required; 10 CFR 830.120(c)(2)(ii) requires that design work including changes, shall incorporate applicable requirements and design bases; 10 CFR 830.120(c)(2)(iv) requires that inspection and testing of specified items, services, and processes shall be conducted

19

Approximating European Options by Rebate Barrier Options  

E-Print Network [OSTI]

When the underlying stock price is a strict local martingale process under an equivalent local martingale measure, Black-Scholes PDE associated with an European option may have multiple solutions. In this paper, we study an approximation for the smallest hedging price of such an European option. Our results show that a class of rebate barrier options can be used for this approximation, when its rebate and barrier are chosen appropriately. An asymptotic convergence rate is also achieved when the knocked-out barrier moves to infinity under suitable conditions.

Song, Qingshuo

2011-01-01T23:59:59.000Z

20

Natural Gas Purchasing Options  

E-Print Network [OSTI]

As a result of economic and regulatory changes, the natural gas marketplace now offers multiple options for purchasers. The purpose of this panel is to discuss short-term purchasing options and how to take advantage of these options both to lower...

Watkins, G.

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Polymer solidification of mixed wastes at the Rocky Flats Plant  

SciTech Connect (OSTI)

The Rocky Flats Plant is pursuing polymer solidification as a viable treatment option for several mixed waste streams that are subject to land disposal restrictions within the Resource Conservation and Recovery Act provisions. Tests completed to date using both surrogate and actual wastes indicate that polyethylene microencapsulation is a viable treatment option for several mixed wastes at the Rocky Flats Plant, including nitrate salts, sludges, and secondary wastes such as ash. Treatability studies conducted on actual salt waste demonstrated that the process is capable of producing waste forms that comply with all applicable regulatory criteria, including the Toxicity Characteristic Leaching Procedure. Tests have also been conducted to evaluate the feasibility of macroencapsulating certain debris wastes in polymers. Several methods and plastics have been tested for macroencapsulation, including post-consumer recycle and regrind polyethylene.

Faucette, A.M.; Logsdon, B.W.; Lucerna, J.J.; Yudnich, R.J.

1994-02-01T23:59:59.000Z

22

Semiconductor-based, large-area, flexible, electronic devices on {110}<100> oriented substrates  

DOE Patents [OSTI]

Novel articles and methods to fabricate the same resulting in flexible, oriented, semiconductor-based, electronic devices on {110}<100> textured substrates are disclosed. Potential applications of resulting articles are in areas of photovoltaic devices, flat-panel displays, thermophotovoltaic devices, ferroelectric devices, light emitting diode devices, computer hard disc drive devices, magnetoresistance based devices, photoluminescence based devices, non-volatile memory devices, dielectric devices, thermoelectric devices and quantum dot laser devices.

Goyal, Amit

2014-08-05T23:59:59.000Z

23

TANK SPACE OPTIONS REPORT  

SciTech Connect (OSTI)

Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

WILLIS WL; AHRENDT MR

2009-08-11T23:59:59.000Z

24

Local Option - Property Tax Credit for Renewables and Energy Conservation  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Property Tax Credit for Renewables and Energy Local Option - Property Tax Credit for Renewables and Energy Conservation Devices Local Option - Property Tax Credit for Renewables and Energy Conservation Devices < Back Eligibility Agricultural Commercial Industrial Low-Income Residential Multi-Family Residential Residential Savings Category Other Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate Varies by jurisdiction. Program Info State Maryland Program Type Property Tax Incentive Rebate Amount Varies by jurisdiction; credit may be available for up to 3 years. Title 9 of Maryland's property tax code provides local governments the option to allow a property tax credit for buildings equipped with a solar, geothermal or qualifying energy conservation device. These devices may be

25

Interconnector device  

SciTech Connect (OSTI)

This patent describes an interconnector device that allows a lithium-type battery to be substituted for a Leclanche battery. The Leclanche battery is of predetermined dimensions and has a pair of coil spring connection terminals at predetermined locations on the top surface thereof. The lithium battery of different predetermined dimensions than the Lechanche battery and has a pair of female connection sockets positioned at a predetermined off-center location on the top surface. The locations of the coil spring terminals and the connection sockets of the respective batteries are at substantially different non-matching positions, comprising a thin flat water of non-conducive material of predetermined size and configuration, the wafer having the same cross-section dimensions as the Leclanche battery. A pair of prongs on the underside surface of the wafer and at locations correspond to the locations of the female connection sockets of the lithium battery. The prongs received into the female connection sockets when the interconnector device is mounted on the lithium batter. A pair of coil spring connection terminals mounted on the opposite of top surface of the wafer and having a configuration which matches that of the connection terminals of the Leclanche battery and positioned at locations which corresponds to the locations of the coil spring connection terminals of the Leclanche battery. A pair of electrical conductors plated on the underside surface of the wafer for respectively interconnecting the pairs of prongs and the pair of coil spring connection terminals in parallel.

Christopulos, J.A.

1987-07-07T23:59:59.000Z

26

Flat-to-Flat Solder Seal Andrey Elagin1  

E-Print Network [OSTI]

surfaces are coated with 200nm of NiCr (80:20%) and 200nm of Cu If long time in air before sealing ­ clean1 Flat-to-Flat Solder Seal Andrey Elagin1 , Henry Frisch1 , Mary Heintz1 , Richard Northrop1 A complete LAPPD glass tile except for an aluminum photo-cathode top seal by compression on a viton o

27

Windy Flats | Open Energy Information  

Open Energy Info (EERE)

Flats Flats Jump to: navigation, search Name Windy Flats Facility Windy Flats Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Cannon Power Group Developer Cannon Power Group Location North shore of Columbia River Coordinates 45.699622°, -120.774622° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.699622,"lon":-120.774622,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

28

Soil Decontamination at Rocky Flats  

Science Journals Connector (OSTI)

During the last few years, many articles have appeared in newspapers and journals concerning radioactive contamination around Rocky Flats.1,2 The amount of plutonium in the soil has been of particular interest. T...

R. L. Olsen; J. A. Hayden; C. E. Alford

1980-01-01T23:59:59.000Z

29

Independent Oversight Review, Rocky Flats Environmental Technology...  

Office of Environmental Management (EM)

Review, Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky...

30

Revegetation of the Rocky Flats Site | Department of Energy  

Energy Savers [EERE]

Flats Site Revegetation of the Rocky Flats Site Revegetation of the Rocky Flats, Colorado Site Revegetation of the Rocky Flats Site More Documents & Publications Landfill...

31

NREL: More Search Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

More Search Options More Search Options Search More Search Options Site Map Printable Version The following options help you find information on the National Renewable Energy Laboratory site, locate NREL staff, browse publication and photograph collections, and see what hot topics other site visitors are looking for. Search the NREL Web Site Search Tip: use quotes to find exact phrases Example: "renewable energy" Tip: use plus signs to find results that contain all your search terms Example: +biodiesel +buses Search Help Find NREL Staff in the Employee Locator Search by first or last name: Search Select a search type Select your criteria Enter your search term Look at Recent Hot Topics Biomass HOMER (computer model) Hybrid Electric Vehicles Hydrogen and Fuel Cells Jobs PVWATTS (software)

32

Stretchable and foldable electronic devices  

DOE Patents [OSTI]

Disclosed herein are stretchable, foldable and optionally printable, processes for making devices and devices such as semiconductors, electronic circuits and components thereof that are capable of providing good performance when stretched, compressed, flexed or otherwise deformed. Strain isolation layers provide good strain isolation to functional device layers. Multilayer devices are constructed to position a neutral mechanical surface coincident or proximate to a functional layer having a material that is susceptible to strain-induced failure. Neutral mechanical surfaces are positioned by one or more layers having a property that is spatially inhomogeneous, such as by patterning any of the layers of the multilayer device.

Rogers, John A; Huang, Yonggang; Ko, Heung Cho; Stoykovich, Mark; Choi, Won Mook; Song, Jizhou; Ahn, Jong Hyun; Kim, Dae Hyeong

2014-12-09T23:59:59.000Z

33

Stretchable and foldable electronic devices  

DOE Patents [OSTI]

Disclosed herein are stretchable, foldable and optionally printable, processes for making devices and devices such as semiconductors, electronic circuits and components thereof that are capable of providing good performance when stretched, compressed, flexed or otherwise deformed. Strain isolation layers provide good strain isolation to functional device layers. Multilayer devices are constructed to position a neutral mechanical surface coincident or proximate to a functional layer having a material that is susceptible to strain-induced failure. Neutral mechanical surfaces are positioned by one or more layers having a property that is spatially inhomogeneous, such as by patterning any of the layers of the multilayer device.

2013-10-08T23:59:59.000Z

34

Nevada Transportatoion Options Study  

SciTech Connect (OSTI)

This study performs a cost and schedule analysis of three Nevada Transportation options that support waste receipt at the repository. Based on the U.S. Department of Energy preference for rail transportation in Nevada (given in the Final Environmental Impact Statement), it has been assumed that a branch rail line would be constructed to support waste receipt at the repository. However, due to potential funding constraints, it is uncertain when rail will be available. The three Nevada Transportation options have been developed to meet a varying degree of requirements for transportation and to provide cost variations used in meeting the funding constraints given in the Technical Direction Letter guidelines for this study. The options include combinations of legal-weight truck, heavy-haul truck, and rail. Option 1 uses a branch rail line that would support initial waste receipt at the repository in 2010. Rail transportation would be the primary mode, supplemented by legal weight trucks. This option provides the highest level of confidence in cost and schedule, lowest public visibility, greatest public acceptability, lowest public dose, and is the recommended option for support of waste receipt. The completion of rail by 2010 will require spending approximately $800 million prior to 2010. Option 2 uses a phased rail approach to address a constrained funding scenario. To meet funding constraints, Option 2 uses a phased approach to delay high cost activities (final design and construction) until after initial waste receipt in 2010. By doing this, approximately 95 percent of the cost associated with completion of a branch rail line is deferred until after 2010. To support waste receipt until a branch rail line is constructed in Nevada, additional legal-weight truck shipments and heavy-haul truck shipments (on a limited basis for naval spent nuclear fuel) would be used to meet the same initial waste receipt rates as in Option 1. Use of heavy-haul shipments in the absence of rail is restricted to approximately twelve, without upgrading public highways. There is high uncertainty as to what road upgrades and security/escorts the Nevada Department of Transportation would require to obtain an overweight/overdimensional permit. In addition, the Naval Nuclear Propulsion Program has indicated that a larger cask weight than that analyzed in the Final Environmental Impact Statement may be required for naval shipments, resulting in additional costs for heavy-haul transport. These uncertainties result in a high cost and schedule risk. Option 3 assumes that the start of rail construction will be delayed until after construction authorization is received from the Nuclear Regulatory Commission. Similar to Option 2, Option 3 uses legal-weight truck shipments and limited heavy haul truck shipments to meet the same initial waste receipt rates as Option 1, until rail becomes available. By using heavy-haul truck for two years, Option 3 contains the same uncertainties and resultant high cost and schedule risk as Option 2. The cost and schedule of legal-weight truck transport are not included in this report as that will be evaluated in the report on national transportation.

P. GEHNER; E.M. WEAVER; L. FOSSUM

2006-05-25T23:59:59.000Z

35

Programming Tuning Options on Hopper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tuning Options Programming Tuning Options Using Huge Pages Hugepages are virtual memory pages which are bigger than the default base page size of 4KB. Some applications may...

36

Edit Test Options Page 1 Edit Test Options  

E-Print Network [OSTI]

Edit Test Options Page 1 Edit Test Options Format Test Information 1. Enter a Name for the Test. 2. Choose a color for the title text of the Test. (Optional) 3. Enter a Description in the Text Box. The description is visible to Students before they click on the link to take the Test. (Optional) 4. If you want

Xu, Shouhuai

37

Comparative risk analysis for the Rocky Flats Plant integrated project planning  

SciTech Connect (OSTI)

The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative risk analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or end states. These postulated options or end states can be various remedial alternatives, or future endstate uses of federal land.

Jones, M.E.; Shain, D.I.

1994-12-31T23:59:59.000Z

38

Comparative risk analysis for the Rocky Flats Plant integrated project planning  

SciTech Connect (OSTI)

The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges.

Jones, M.E.; Shain, D.I.

1994-05-01T23:59:59.000Z

39

Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning  

SciTech Connect (OSTI)

The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

Jones, M.E. [EG& G Rocky Flats, Inc., Englewood, CO (United States); Shain, D.I. [EG& G Rocky Flats, Inc., Golden, CO (United States)

1994-12-31T23:59:59.000Z

40

Optimization of solar flat collector inclination  

Science Journals Connector (OSTI)

Solar collectors need to be inclined at the optimum angle to maximize the receiving energy. In spite of many theoretical and experimental investigations on optimization of solar collector inclination, there is an inconsistency in presented results. In this paper, solar global radiation on a horizontal surface was estimated using a mathematical model and the results were compared with the recorded data from the Zahedan city meteorological station. Total received solar energy by a flat inclined collector was determined in a certain day, and searching for the angle which has the maximum incident energy was the general procedure in determination of daily optimum tilt angle. In case of operational limitation for daily tilt adjustment, this procedure is repeated for other specific period of time and monthly, seasonal, semi-annual and annual optimum tilt angles were determined. A MATLAB-based code is used to calculate the daily optimum tilt angle. The results were in good agreement with the obtained data of a new constructed device. Finally, in the case of stationary devices, some recommendations were presented with respect to their typical application.

Hamid Moghadam; Farshad Farshchi Tabrizi; Ashkan Zolfaghari Sharak

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Hydrogen Production Infrastructure Options Analysis  

Broader source: Energy.gov [DOE]

Presentation on hydrogen production and infrastructure options presented at the DOE Transition Workshop.

42

Thermal test options  

SciTech Connect (OSTI)

Shipping containers for radioactive materials must be qualified to meet a thermal accident environment specified in regulations, such at Title 10, Code of Federal Regulations, Part 71. Aimed primarily at the shipping container design, this report discusses the thermal testing options available for meeting the regulatory requirements, and states the advantages and disadvantages of each approach. The principal options considered are testing with radiant heat, furnaces, and open pool fires. The report also identifies some of the facilities available and current contacts. Finally, the report makes some recommendations on the appropriate use of these different testing methods.

Koski, J.A.; Keltner, N.R.; Sobolik, K.B.

1993-02-01T23:59:59.000Z

43

Numerical Study of Convective Heat Transfer in Flat Tube Heat Exchangers Operating in Self-Sustained Oscillatory Flow Regimes  

E-Print Network [OSTI]

Laminar, two-dimensional, constant-property numerical simulations of flat tube heat exchanger devices operating in flow regimes in which self-sustained oscillations occur were performed. The unsteady flow regimes were transition flow regimes...

Fullerton, Tracy

2012-02-14T23:59:59.000Z

44

Laser illuminated flat panel display  

SciTech Connect (OSTI)

A 10 inch laser illuminated flat panel Planar Optic Display (POD) screen has been constructed and tested. This POD screen technology is an entirely new concept in display technology. Although the initial display is flat and made of glass, this technology lends itself to applications where a plastic display might be wrapped around the viewer. The display screen is comprised of hundreds of planar optical waveguides where each glass waveguide represents a vertical line of resolution. A black cladding layer, having a lower index of refraction, is placed between each waveguide layer. Since the cladding makes the screen surface black, the contrast is high. The prototype display is 9 inches wide by 5 inches high and approximately I inch thick. A 3 milliwatt HeNe laser is used as the illumination source and a vector scanning technique is employed.

Veligdan, J.T.

1995-12-31T23:59:59.000Z

45

Physics & Astronomy Degree options  

E-Print Network [OSTI]

148 Physics & Astronomy Degree options BSc (Single Honours Degrees) Astrophysics Physics MPhys AND HL7 in Mathematics Physics and Astronomy (Gateway and International Gateway) Entry For UK students. Physics&Astronomy Subject enquiries Dr Kenny Wood E: physics@st-andrews.ac.uk Features * The nature

Brierley, Andrew

46

Idaho's Energy Options  

SciTech Connect (OSTI)

This report, developed by the Idaho National Laboratory, is provided as an introduction to and an update of the status of technologies for the generation and use of energy. Its purpose is to provide information useful for identifying and evaluating Idahos energy options, and for developing and implementing Idahos energy direction and policies.

Robert M. Neilson

2006-03-01T23:59:59.000Z

47

Fuels options conference  

SciTech Connect (OSTI)

The proceedings of the Fuels Options Conference held May 9-10, 1995 in Atlanta, Georgia are presented. Twenty-three papers were presented at the conference that dealt with fuels outlook; unconventional fuels; fuel specification, purchasing, and contracting; and waste fuels applications. A separate abstract was prepared for each paper for inclusion in the Energy Science and Technology Database.

NONE

1995-09-01T23:59:59.000Z

48

OVERVIEW OF CONTRACTING OPTIONS  

E-Print Network [OSTI]

OVERVIEW OF CONTRACTING OPTIONS Presented by Bill McNally July 24, 2012 #12;National Aeronautics and Space Administration Selecting the Right Contract Type · Objective ­ Negotiate a contract type and price a Contract Type · What are your acquisition's objectives? ­ New program? ­ Existing program? (Historical

Waliser, Duane E.

49

Economics & Finance Degree options  

E-Print Network [OSTI]

98 Economics & Finance Degree options MA or BSc (Single Honours Degrees) Applied Economics Economics Financial Economics BA (International Honours Degree) Economics (See page 51) MA or BSc (Joint Honours Degrees) Economics and one of: Geography Management Mathematics MA (Joint Honours Degrees

Brierley, Andrew

50

Residue management at Rocky Flats  

SciTech Connect (OSTI)

Past plutonium production and manufacturing operations conducted at the Rocky Flats Environmental Technology Site (RFETS) produced a variety of plutonium-contaminated by-product materials. Residues are a category of these materials and were categorized as {open_quotes}materials in-process{close_quotes} to be recovered due to their inherent plutonium concentrations. In 1989 all RFETS plutonium production and manufacturing operations were curtailed. This report describes the management of plutonium bearing liquid and solid wastes.

Olencz, J.

1995-12-31T23:59:59.000Z

51

DHS Flat Stanley Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to implement the Flat Stanley Project to help kids learn about the importance of cybersecurity. By downloading and using the Flat Stanley App, kids will be able to create their...

52

DOE - Office of Legacy Management -- Rocky Flats External Resources  

Office of Legacy Management (LM)

Rocky Flats Stewardship Council Disclaimer Rocky Flats Cold War Museum Disclaimer U.S. Fish and Wildlife Service Rocky Flats National Wildlife Refuge Disclaimer Last Updated: 51...

53

ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy  

Energy Savers [EERE]

ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications...

54

Smooth Brome Monitoring at Rocky Flats-2005 Results | Department...  

Energy Savers [EERE]

Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring...

55

Hydrogen Delivery Infrastructure Option Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen Delivery Infrastructure Hydrogen Delivery Infrastructure Option Analysis Option Analysis DOE and FreedomCAR & Fuel Partnership Hydrogen Delivery and On-Board Storage Analysis Workshop January 25, 2005 Washington DC This presentation does not contain any proprietary or confidential information Tan-Ping Chen Nexant Jim Campbell Bhadra Grover Air Liquide Stefan Unnasch TIAX Glyn Hazelden GTI Graham Moore Chevron Matt Ringer NREL Ray Hobbs Pinnacle West 2 Presentation Outline Project Background Knowledge Collected and Preliminary Results for Each Delivery Option Summary of Observations Next Step Project Background Project Background 4 Delivery Options Option 1* GH delivery by new pipelines Option 2 Converting NG/oil pipelines for GH delivery Option 3 Blending GH into NG pipelines Option 4* GH tube trailers

56

The Window Strategy with Options  

E-Print Network [OSTI]

The window strategy is one of several marketing strategies using futures and options to establish a floor price and allow for upside price potential. It also reduces option premium costs. This publication discusses how the window strategy works...

McCorkle, Dean; Amosson, Stephen H.; Fausett, Marvin

1999-06-23T23:59:59.000Z

57

Milk Futures, Options and Basis  

E-Print Network [OSTI]

The milk futures and options market enables producers and processors to manage price risk. This publication explains hedging, margin accounts, basis and how to track it, and other fundamentals of the futures and options market....

Haigh, Michael; Stockton, Matthew; Anderson, David P.; Schwart Jr., Robert B.

2001-10-12T23:59:59.000Z

58

Design options for clothes washers  

SciTech Connect (OSTI)

This report discusses possible design options for improving the energy efficiency of standard capacity, residential clothes washers.

Biermayer, Peter J.

1996-10-01T23:59:59.000Z

59

Closing Rocky Flats by 2006  

SciTech Connect (OSTI)

Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal. This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.

Tuor, N. R.; Schubert, A. L.

2002-02-26T23:59:59.000Z

60

Indian space effort: Falling flat  

Science Journals Connector (OSTI)

... team at Hassan near Banglore struggled with the jammed C-band antenna and a stuck solar sail. The antenna was deployed after much expenditure of fuel but the team had ... was deployed after much expenditure of fuel but the team had no luck with the solar sail, an umbrella-shaped device meant to offset the imbalance caused by INSAT-1 ...

1982-09-23T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft Word - TurtleFlats_CX  

Office of Environmental Management (EM)

Project Manager - KEWM-4 Proposed Action: Turtle Flats Property Acquisition Funding Fish and Wildlife Project No.: 2011-003-00, BPA-007521 Categorical Exclusion Applied (from...

62

Peak load management: Potential options  

SciTech Connect (OSTI)

This report reviews options that may be alternatives to transmission construction (ATT) applicable both generally and at specific locations in the service area of the Bonneville Power Administration (BPA). Some of these options have potential as specific alternatives to the Shelton-Fairmount 230-kV Reinforcement Project, which is the focus of this study. A listing of 31 peak load management (PLM) options is included. Estimated costs and normalized hourly load shapes, corresponding to the respective base load and controlled load cases, are considered for 15 of the above options. A summary page is presented for each of these options, grouped with respect to its applicability in the residential, commercial, industrial, and agricultural sectors. The report contains comments on PLM measures for which load shape management characteristics are not yet available. These comments address the potential relevance of the options and the possible difficulty that may be encountered in characterizing their value should be of interest in this investigation. The report also identifies options that could improve the efficiency of the three customer utility distribution systems supplied by the Shelton-Fairmount Reinforcement Project. Potential cogeneration options in the Olympic Peninsula are also discussed. These discussions focus on the options that appear to be most promising on the Olympic Peninsula. Finally, a short list of options is recommended for investigation in the next phase of this study. 9 refs., 24 tabs.

Englin, J.E.; De Steese, J.G.; Schultz, R.W.; Kellogg, M.A.

1989-10-01T23:59:59.000Z

63

Transition Strategies: Government Options and Market Penetration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Strategies: Government Options and Market Penetration Scenarios Transition Strategies: Government Options and Market Penetration Scenarios Presentation on Transition Strategies:...

64

Daydreaming Devices  

E-Print Network [OSTI]

Daydreaming Devices is a project on aspects of daydream and the design of convertible furniture within the context of art. This thesis addresses the concepts and the design of two daydreaming devices developed during my ...

Da Ponte, Ana Sofia Lopes

2008-01-01T23:59:59.000Z

65

Supercontinuum-based 10-GHz flat-topped optical frequency comb generation  

E-Print Network [OSTI]

and Nanoscience Department, Chalmers University of Technology, SE-41296 Göteborg, Sweden * rwu@purdue.edu Abstract-topped optical frequency comb (> 3.64-THz or 28 nm bandwidth with ~365 spectral lines within 3.5-dB power device allows the pulses to enter into the optical wave-breaking regime, thus achieving a smooth flat

Purdue University

66

Rural Health Option The Rural Health Option requires  

E-Print Network [OSTI]

Rural Health Option The Rural Health Option requires: Membership in StORM Club, the Students include up to 3 sites/3physician-mentors Enrollment into BOTH rural health electives for a total of 2.sumner@okstate.edu) o Spring: Perspectives in Rural Health for OMSI or OMSII (or OMSIII with special permission) CLME

Veiga, Pedro Manuel Barbosa

67

Whiskey Flats Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Whiskey Flats Geothermal Area Whiskey Flats Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Whiskey Flats Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Map: Whiskey Flats Geothermal Area Whiskey Flats Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

68

Flat Directions and Baryogenesis in Supersymmetric Theories  

E-Print Network [OSTI]

Flat directions are a generic feature of supersymmetric theories. They are of cosmological interest because they can lead to coherent production of scalars. In the early universe such flat directions could be dangerous due to the potentially large energy density and the late decay of the associated scalars when they have only $1/M_p$ couplings (Polonyi problem). On the other hand, flat directions among the standard model fields can carry baryon number and lead to a possible mechanism for baryogenesis (Affleck Dine baryogenesis). When considering the cosmological consequences of the flat directions, it is important to take into account the soft potential with curvature of order the Hubble constant due to supersymmetry breaking in the early universe. In this talk, we discuss flat directions, their potential cosmological implications focusing on Affleck-Dine baryogenesis, and how the standard picture of their evolution must be modified in the presence of the large supersymmetry breaking in the early universe.

Lisa Randall

1995-07-08T23:59:59.000Z

69

Rocky Flats ash test procedure (sludge stabilization)  

SciTech Connect (OSTI)

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

Winstead, M.L.

1995-09-14T23:59:59.000Z

70

Characterization of Plutonium in Maxey Flats Radioactive Trench Leachates  

Science Journals Connector (OSTI)

...leachates at the Maxey Flats radioactive waste disposal site exists as dissolved...leachates at the Maxey Flats radioactive waste disposal site exists as dissolved...leachates at the Maxey Flats radioactive waste disposal site exists as dissolved...

JESS M. CLEVELAND; TERRY F. REES

1981-06-26T23:59:59.000Z

71

REVEGETATION OF THE ROCKY FLATS SITE, COLORADO  

Broader source: Energy.gov (indexed) [DOE]

REVEGETATION OF THE ROCKY FLATS SITE, COLORADO REVEGETATION OF THE ROCKY FLATS SITE, COLORADO Jody K. Nelson Professional Environmental Group/S.M. Stoller Corporation Rocky Flats Site 11025 Dover Street, Suite 1000 Westminster, CO 80021 ABSTRACT At the U.S. Department of Energy's (DOE's) Rocky Flats Site (Site), a former nuclear weapons component manufacturing plant near Golden, Colorado, approximately 650 acres were revegetated as part of the cleanup and closure activities. Numerous issues and challenges were addressed during the revegetation activities at the Site. These included deciding on revegetation and restoration goals; addressing poor substrate issues and soil compaction problems; use of soil amendments and topsoil; seed selection issues; timing and location of revegetation projects

72

Chestnut Flats Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Chestnut Flats Wind Farm Chestnut Flats Wind Farm Jump to: navigation, search Name Chestnut Flats Wind Farm Facility Chestnut Flats Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Developer Gamesa Energy Energy Purchaser Delmarva Power Location Logan Township PA Coordinates 40.357314°, -78.594482° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.357314,"lon":-78.594482,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

73

NPP Boreal Forest: Canal Flats, Canada  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Canal Flats, Canada, 1984 Canal Flats, Canada, 1984 Data Citation Cite this data set as follows: Comeau, P. G., and J. P. Kimmins. 1999. NPP Boreal Forest: Canal Flats, Canada, 1984. Data set. Available on-line [http://www.daac.ornl.gov] from Oak Ridge National Laboratory Distributed Active Archive Center, Oak Ridge, Tennessee, U.S.A. Description Above and below-ground biomass and productivity of four lodgepole pine stands (Pinus contorta var. latifolia) were determined near Canal Flats, Canada, during the 1984 growing season. Two stands growing on xeric sites and two stands growing on mesic sites were studied to determine the influence of soil water content on resource allocation to above-ground versus below-ground plant components. The stands were 70-78 years old, unmanaged, and had regenerated naturally following wildfire.

74

Caithness Shepherds Flat | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

nearly 1.4 million operating hours. By supporting initiatives like the Shepherds Flat Project, the Department of Energy is fighting climate change, while encouraging the U.S....

75

Rocky Flats resumes shipments to WIPP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rocky Flats Resumes Shipments to WIPP CARLSBAD, N.M., March 11, 2000 - The U.S. Department of Energy (DOE) has resumed transuranic radioactive waste shipments from DOE's Rocky...

76

Rocky Flats Ash test procedure (sludge stabilization)  

SciTech Connect (OSTI)

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

Funston, G.A.

1995-06-14T23:59:59.000Z

77

Shepherds Flat Central | Open Energy Information  

Open Energy Info (EERE)

Shepherds Flat Central Shepherds Flat Central Jump to: navigation, search Name Shepherds Flat Central Facility Shepherds Flat Central Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer Caithness Energy Purchaser Southern California Edison Co Location Gilliam and Morrow Counties OR Coordinates 45.655°, -120.056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.655,"lon":-120.056,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

78

Flat Ridge 2 Expansion | Open Energy Information  

Open Energy Info (EERE)

Flat Ridge 2 Expansion Flat Ridge 2 Expansion Jump to: navigation, search Name Flat Ridge 2 Expansion Facility Flat Ridge 2 Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy Developer BP Wind Energy Energy Purchaser Arkansas Electric Cooperative Corp Location Sharon KS Coordinates 37.383239°, -98.334088° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.383239,"lon":-98.334088,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

79

Neptunium processing at the Rocky Flats Plant  

SciTech Connect (OSTI)

Small quantities of neptunium-237 have been processed at the Rocky Flats Plant since 1962. This processing has involved preparation of pure neptunium oxide, metal, and metal alloys, and the recovery of neptunium-237 from a variety of residues. This report describes the processes used at Rocky Flats to recover and purify neptunium in addition to processes used for conversion to metal for casting and for rolling.

Conner, W.V.; Baaso, D.L.

1981-09-20T23:59:59.000Z

80

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado...  

Broader source: Energy.gov (indexed) [DOE]

Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA Vascular Flora of the Rocky Flats Area, Jefferson County, Colorado, USA August 2010 Jody K. Nelson Vascular...

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

LM Records Handling System (LMRHS01) - Rocky Flats Environmental...  

Office of Environmental Management (EM)

LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records Database, Office of Legacy Management LM Records Handling System (LMRHS01) - Rocky Flats Environmental...

82

Geothermometry At Gabbs Alkali Flat Area (Kratt, Et Al., 2008...  

Open Energy Info (EERE)

Alkali Flat Area (Kratt, Et Al., 2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Gabbs Alkali Flat Area (Kratt, Et Al.,...

83

Rocky Flats Environmental Technology Site Archived Soil & Groundwater...  

Office of Environmental Management (EM)

Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky Flats Environmental Technology Site Archived Soil & Groundwater Master Reports Rocky...

84

Independent Oversight Special Review, Rocky Flats Closure Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001...

85

Review of Beryllium Management Practices at Rocky Flats During...  

Broader source: Energy.gov (indexed) [DOE]

Beryllium Management Practices at Rocky Flats During Closure Operations Review of Beryllium Management Practices at Rocky Flats During Closure Operations Administrative and...

86

Preliminary Notice of Violation , Rocky Flats Environmental Technology...  

Broader source: Energy.gov (indexed) [DOE]

Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary...

87

Landfill Cover Revegetation at the Rocky Flats Environmental...  

Energy Savers [EERE]

Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover Revegetation at the Rocky Flats Environmental Technology Site Landfill Cover...

88

Electrochromic devices  

DOE Patents [OSTI]

An electrochromic device is disclosed having a selective ion transport layer which separates an electrochemically active material from an electrolyte containing a redox active material. The devices are particularly useful as large area architectural and automotive glazings due to there reduced back reaction.

Allemand, Pierre M. (Tucson, AZ); Grimes, Randall F. (Ann Arbor, MI); Ingle, Andrew R. (Tucson, AZ); Cronin, John P. (Tucson, AZ); Kennedy, Steve R. (Tuscon, AZ); Agrawal, Anoop (Tucson, AZ); Boulton, Jonathan M. (Tucson, AZ)

2001-01-01T23:59:59.000Z

89

SCIENTIFIC NOTE Variations in daily quality assurance dosimetry from device  

E-Print Network [OSTI]

SCIENTIFIC NOTE Variations in daily quality assurance dosimetry from device levelling, feet procedures are an essential part of radiotherapy medical physics. Devices such as the Sun Nuclear, DQA3 are effective tools for analysis of daily dosimetry including flatness, symmetry, energy, field size and central

Yu, K.N.

90

Hydrogen Delivery Infrastructure Options Analysis  

Fuel Cell Technologies Publication and Product Library (EERE)

This report, by the Nexant team, documents an in-depth analysis of seven hydrogen delivery options to identify the most cost-effective hydrogen infrastructure for the transition and long term. The pro

91

Digital Options for Panoramic Radiology  

Science Journals Connector (OSTI)

Digital X-ray imaging is making substantial inroads into the dental practice. The purpose of this chapter is to provide a succinct overview of the various digital options for panoramic dental radiography.

2007-01-01T23:59:59.000Z

92

INTEGRATIVE BIOSCIENCES (IBIOS) GRADUATE PROGRAM OPTION  

E-Print Network [OSTI]

INTEGRATIVE BIOSCIENCES (IBIOS) GRADUATE PROGRAM OPTION IN Bioinformatics and Genomics (BG) Degree-Faculty Relation----------------------------------------------------------------- 8 Bioinformatics and Genomics--------------------------------------------------------------------------------------------------17 #12;- -3 Bioinformatics and Genomics Option (BG

dePamphilis, Claude

93

Video Project Option | Photosynthetic Antenna Research Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Video Project Option Video Project Option PARC Education & Outreach Video Students enrolled in the PARCI-CARES Certificate in Renewable Energy and the Environment may choose to...

94

Energy Options Solutions | Open Energy Information  

Open Energy Info (EERE)

Energy Options & Solutions Place: Ann Arbor, Michigan Zip: 48103 Product: Michigan-based alternative energy consultant. References: Energy Options & Solutions1 This article is a...

95

Flat Water Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Flat Water Wind Farm Flat Water Wind Farm Jump to: navigation, search Name Flat Water Wind Farm Facility Flat Water Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Gestamp Wind North America Developer Flat Water Wind Farm Energy Purchaser Omaha Public Power District Location Richardson County NE Coordinates 40.001077°, -95.955119° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.001077,"lon":-95.955119,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

96

Rocky Flats Compliance Program; Technology summary  

SciTech Connect (OSTI)

The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE`s strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP.

NONE

1994-02-01T23:59:59.000Z

97

Microchannel devices  

SciTech Connect (OSTI)

The fabrication of stainless steel microchannel heat exchangers was examined through microlamination, the process of diffusion bonding precision machined metallic foils. The influence of diffusion bonding parameters, as well as the device geometry on the strength of the bond between the foils and embedded channel integrity, was investigated. During diffusion bonding, high temperatures and/or pressures result in well bonded foils, but these conditions cause the embedded channels to deform, which will degrade the efficiency of fluid flow through the channels. Alternatively, low temperatures and/or pressures result in undeformed channels but weakly bonded foils. This causes failure of the device due to fluid leakage. Thus, a processing envelope exists for producing a sound device with no fluid leakage and no degradation of fluid flow properties. The theoretical limit on aspect ratio within two-fluid counter-flow microchannel heat exchangers was also investigated. A counter-flow device is comprised of alternating layers of microchannels, which allow the two fluids to flow in opposite directions separated by fins. A theoretical model for interpreting the span of the fin as a function of the fin thickness was established. The model was verified experimentally by fabricating specimens to simulate the counter-flow device. The results of these investigations were used to aid in the design and processing of prototype microchannel devices.

Alman, David E.; Wilson, Rick D.

2001-09-01T23:59:59.000Z

98

Flat Ridge 2 | Open Energy Information  

Open Energy Info (EERE)

Flat Ridge 2 Flat Ridge 2 Facility Flat Ridge 2 Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy / Sempra Energy Developer BP Wind Energy Energy Purchaser Associated Electric Cooperative Inc / Southwestern Electric Power Location Nashville KS Coordinates 37.367868°, -98.240757° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.367868,"lon":-98.240757,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

99

Solid waste recycling programs at Rocky Flats  

SciTech Connect (OSTI)

The Rocky Flats (RFP) recycling programs for solid waste materials have been in place for over ten years. Within the last three years, the programs were centralized under the direction of the Rocky Flats Waste Minimization department, with the assistance of various plant organizations (e.g., Trucking, Building Services, Regulated Waste Operations, property Utilization and Disposal and Security). Waste Minimization designs collection and transportation systems for recyclable materials and evaluates recycling markets for opportunities to add new commodities to the existing programs. The Waste Minimization department also promotes employee participation in the Rocky Flats Recycling Programs, and collects all recycling data for publication. A description of the program status as of January 1994 is given.

Millette, R.L.; Blackman, T.E.; Shepard, M.D. [EG and G Rocky Flats, Inc., Golden, CO (United States)

1994-12-31T23:59:59.000Z

100

BOOMERanG Analysis Finds Flat Universe  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BOOMERanG Analysis BOOMERanG Analysis Finds Flat Universe BOOMERanG Analysis Finds Flat Universe NERSC's Mcurie System Helps Uncover Evidence of 'Cosmological Constant' Proposed, Rejected by Einstien December 12, 1999 Newly released data from the 1997 North American test flight of BOOMERanG, which mapped anisotropies in the cosmic microwave background radiation (CMB) in a narrow strip of sky, show a pronounced peak in the CMB "power spectrum" at an angular scale of about one degree, strong evidence that the universe is flat. Analyzed at the Department of Energy's National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory, the new data also suggest the existence of a cosmological constant, a form of countergravitational "dark energy" thought to fill the universe.

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Stability of Flat Space to Singular Instantons  

E-Print Network [OSTI]

Hawking and the author have proposed a class of singular, finite action instantons for defining the initial conditions for inflation. Vilenkin has argued they are unacceptable. He exhibited an analogous class of asymptotically flat instantons which on the face of it lead to an instability of Minkowski space. However, all these instantons must be defined by introducing a constraint into the path integral, which is then integrated over. I show that with a careful definition these instantons do not possess a negative mode. Infinite flat space is therefore stable against decay via singular instantons.

Neil Turok

1999-01-27T23:59:59.000Z

102

Taming Past LTL and Flat Counter Systems  

E-Print Network [OSTI]

Reachability and LTL model-checking problems for flat counter systems are known to be decidable but whereas the reachability problem can be shown in NP, the best known complexity upper bound for the latter problem is made of a tower of several exponentials. Herein, we show that the problem is only NP-complete even if LTL admits past-time operators and arithmetical constraints on counters. Actually, the NP upper bound is shown by adequately combining a new stuttering theorem for Past LTL and the property of small integer solutions for quantifier-free Presburger formulae. Other complexity results are proved, for instance for restricted classes of flat counter systems.

Demri, Stphane; sangnier, Arnaud

2012-01-01T23:59:59.000Z

103

Issues evaluation process at Rocky Flats Plant  

SciTech Connect (OSTI)

This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

Smith, L.C.

1992-04-16T23:59:59.000Z

104

Chemical tracking at the Rocky Flats Plant  

SciTech Connect (OSTI)

EG&G Rocky Flats, Inc., has developed a chemical tracking system to support compliance with the Emergency Planning and community Right-to-Know Act (EPCRA) at the Rocky Flats Plant. This system, referred to as the EPCRA Chemical Control system (ECCS), uses bar code technology to uniquely identify and track the receipt, distribution, and use of chemicals. Chemical inventories are conducted using hand-held electronic scanners to update a site wide chemical database on a VAX 6000 computer. Information from the ECCS supports preparation of the EPCRA Tier II and Form R reports on chemical storage and use.

Costain, D.B.

1994-04-01T23:59:59.000Z

105

Energy Options for the Future  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Options Options for the Future * John Sheffield, 1 Stephen Obenschain, 2,12 David Conover, 3 Rita Bajura, 4 David Greene, 5 Marilyn Brown, 6 Eldon Boes, 7 Kathyrn McCarthy, 8 David Christian, 9 Stephen Dean, 10 Gerald Kulcinski, 11 and P.L. Denholm 11 This paper summarizes the presentations and discussion at the Energy Options for the Future meeting held at the Naval Research Laboratory in March of 2004. The presentations covered the present status and future potential for coal, oil, natural gas, nuclear, wind, solar, geo- thermal, and biomass energy sources and the effect of measures for energy conservation. The longevity of current major energy sources, means for resolving or mitigating environmental issues, and the role to be played by yet to be deployed sources, like fusion, were major topics of presentation and discussion. KEY WORDS: Energy; fuels; nuclear; fusion; efficiency; renewables.

106

Transportation of pyrochemical salts from Rocky Flats to Los Alamos  

SciTech Connect (OSTI)

Radioactive legacy wastes or residues are currently being stored on numerous Sites around the former Department of Energy`s (DOE) Nuclear Weapons Complex. Since most of the operating facilities were shut down and have not operated since before the declared end to the Cold War in 1993, the historical method for treating these residues no longer exists. The risk associated with continued storage of these residues will dramatically increase with time. Thus, the DOE was directed by the Defense Nuclear Facility Safety Board in its Recommendation 94-1 to address and stabilize these residues and established an eight year time frame for doing so. There are only two options available to respond to this requirement: (1) restart existing facilities to treat and package the residues for disposal or (2) transport the residues to another operating facility within the Complex where they can be treated and packaged for disposal. This paper focuses on one such residue type, pyrochemical salts, produced at one Complex site, the Rocky Flats Plant located northwest of Denver, Colorado. One option for treating the salts is their shipment to Los Alamos, New Mexico, for handling at the Plutonium Facility. The safe transportation of these salts can be accomplished at present with several shipping containers including a DOT 6M, a DOE 9968, Type A or Type B quantity 55-gallon drum overpacks, or even the TRUPACT II. The tradeoffs between each container is examined with the conclusion that none of the available shipping containers is fully satisfactory. Thus, the advantageous aspects of each container must be utilized in an integrated and efficient way to effectively manage the risk involved. 1 fig.

Schreiber, S.B.

1997-02-01T23:59:59.000Z

107

Flat Ridge Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Flat Ridge Wind Farm Flat Ridge Wind Farm Jump to: navigation, search Name Flat Ridge Wind Farm Facility Flat Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy North America/Weststar Energy Developer BP Wind Energy North America Energy Purchaser Weststar Energy Location Barber County KS Coordinates 37.3694801°, -98.4603352° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.3694801,"lon":-98.4603352,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

108

Neal Lane: Science in a Flat World  

SciTech Connect (OSTI)

Lane discusses the changes that have taken place in the world since World War II that have made it "flatter," referring to Thomas L. Friedman's book, The World is Flat. Friedman's main premise is that inexpensive telecommunications is bringing about unhampered international competition, the demise of economic stability, and a trend toward outsourcing services, such as computer programming, engineering and science research.

Neal Lane

2006-09-12T23:59:59.000Z

109

Remediation of the Maxey Flats Site  

SciTech Connect (OSTI)

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

110

GROUPS SENSITIVITY SCORE Flat worms 3  

E-Print Network [OSTI]

GROUPS SENSITIVITY SCORE Flat worms 3 Worms 3 Leeches 2 Crabs or shrimps 7 Stoneflies 14 Minnow The best sites are those with rocks in moving water. Not all sites have rocks (rocky type rivers), but may rocky, sandy, and vegetation habitats, not all habitats are always present at a site. If your river does

de Villiers, Marienne

111

Neal Lane: Science in a Flat World  

ScienceCinema (OSTI)

Lane discusses the changes that have taken place in the world since World War II that have made it "flatter," referring to Thomas L. Friedman's book, The World is Flat. Friedman's main premise is that inexpensive telecommunications is bringing about unhampered international competition, the demise of economic stability, and a trend toward outsourcing services, such as computer programming, engineering and science research.

Neal Lane

2010-09-01T23:59:59.000Z

112

LHC challenges and upgrade options  

Science Journals Connector (OSTI)

The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

O Bruning

2008-01-01T23:59:59.000Z

113

Detection device  

DOE Patents [OSTI]

The present invention is directed to a detection device comprising: (1) an entrance chamber, (2) a central chamber, and (3) an exit chamber. The central chamber includes an ionizing gas, anode, and means for connecting the anode with an external power supply and pulse counter.

Smith, Jay E. (Pittsburgh, PA)

1984-01-01T23:59:59.000Z

114

Thermal Load based Adaptive Tracking for Flat Plate Solar Collectors  

Science Journals Connector (OSTI)

Abstract The energy output of solar-thermal systems using flat plate collectors can be improved by tracking. Tracking is well known as a path for increasing the amount of solar radiation received by the collector; additionally the paper proposes a new concept that considers the inverse tracking as a viable option for protecting the collectors against overheating. An analysis of the thermal energy output and conversion efficiency is done considering forward tracking in three different days with different radiation profile (cloudy, sunny and mixed days), followed by an analysis of the inverse tracking concept. The in-field data show that there is a limiting angle below which inverse tracking is not effective and this value is estimated at 40 as compared with the optimal orientation. A logical scheme is proposed based on four different programs for forward tracking, inverse tracking, maximum inverse tracking or fixing the collector; this decisional scheme covers a broad range of functional situations having as central concept the production of thermal energy only when needed, for satisfying the demand, decreasing the energy consumption for forced circulation and supporting the systems reliability and safety.

Mircea Neagoe; Ion Visa; Bogdan G. Burduhos; Macedon D. Moldovan

2014-01-01T23:59:59.000Z

115

Organic photosensitive devices using subphthalocyanine compounds  

DOE Patents [OSTI]

An organic photosensitive optoelectronic device, having a donor-acceptor heterojunction of a donor-like material and an acceptor-like material and methods of making such devices is provided. At least one of the donor-like material and the acceptor-like material includes a subphthalocyanine, a subporphyrin, and/or a subporphyrazine compound; and/or the device optionally has at least one of a blocking layer or a charge transport layer, where the blocking layer and/or the charge transport layer includes a subphthalocyanine, a subporphyrin, and/or a subporphyrazine compound.

Rand, Barry (Princeton, NJ); Forrest, Stephen R. (Ann Arbor, MI); Mutolo, Kristin L. (Hollywood, CA); Mayo, Elizabeth (Alhambra, CA); Thompson, Mark E. (Anaheim Hills, CA)

2011-07-05T23:59:59.000Z

116

Laser device  

DOE Patents [OSTI]

A laser device includes a virtual source configured to aim laser energy that originates from a true source. The virtual source has a vertical rotational axis during vertical motion of the virtual source and the vertical axis passes through an exit point from which the laser energy emanates independent of virtual source position. The emanating laser energy is collinear with an orientation line. The laser device includes a virtual source manipulation mechanism that positions the virtual source. The manipulation mechanism has a center of lateral pivot approximately coincident with a lateral index and a center of vertical pivot approximately coincident with a vertical index. The vertical index and lateral index intersect at an index origin. The virtual source and manipulation mechanism auto align the orientation line through the index origin during virtual source motion.

Scott, Jill R. (Idaho Falls, ID); Tremblay, Paul L. (Idaho Falls, ID)

2008-08-19T23:59:59.000Z

117

Hydrogen Delivery Options and Issues  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Options and Issues Options and Issues Mark Paster DOE August, 2006 Scope * From the end point of central or distributed production (300 psi H2) to and including the dispenser at a refueling station or stationary power site - GH2 Pipelines and Trucks, LH2 Trucks, Carriers <$1.00/kg of Hydrogen by 2017 Hydrogen Delivery H2 Delivery Current Status * Technology - GH2 Tube Trailers: ~340 kg, ~2600 psi - LH2 Trucks: ~3900 kg - Pipelines: up to 1500 psi (~630 miles in the U.S.) - Refueling Site Operations (compression, storage dispensing): Demonstration projects * Cost (Does NOT include refueling Site Operations) - Trucks: $4-$12/kg - Pipeline: <$2/kg H2A Analysis * Consistent, comparable, transparent approach to hydrogen production and delivery cost analysis * Excel spreadsheet tools with common economic

118

Fuel option for gas turbine  

SciTech Connect (OSTI)

Growth in electricity demand is an average of 10% per year. Energy, emission, and economy are importance of critical concerns for generating systems. Therefore, combined cycle power plant is preferred to Electricity Generating Authority of Thailand (EGAT) new power generating capacity. The various option of available fuel for gas turbine are natural gas, liquid fuel and coal fuel. Particularly with the tremendous price increases in imported and domestic fuel supplies, natural gas is an attractive low cost alternative for power generation. EGAT has researched using heavy fuel instead of natural gas since the year 1991. The problems of various corrosion characteristics have been found. In addition, fuel treatment for gas turbine are needed, and along with it, the environmental consideration are options that provide the limitation of environmental regulation.

Tantayakom, S. [Electricity Generating Authority of Thailand, Nonthaburi (Thailand). Chemical and Analysis Dept.

1995-12-31T23:59:59.000Z

119

Managing Nuclear Waste: Options Considered  

SciTech Connect (OSTI)

Starting in the 1950s, U.S. scientists began to research ways to manage highly radioactive materials accumulating at power plants and other sites nationwide. Long-term surface storage of these materials poses significant potential health, safety, and environmental risks. Scientists studied a broad range of options for managing spent nuclear fuel and high-level radioactive waste. The options included leaving it where it is, disposing of it in various ways, and making it safer through advanced technologies. International scientific consensus holds that these materials should eventually be disposed of deep underground in what is called a geologic repository. In a recent special report, the National Academy of Sciences summarized the various studies and emphasized that geologic disposal is ultimately necessary.

DOE

2002-05-02T23:59:59.000Z

120

Windy Flats Phase III | Open Energy Information  

Open Energy Info (EERE)

Phase III Phase III Jump to: navigation, search Name Windy Flats Phase III Facility Windy Flats Phase III Sector Wind energy Facility Type Commercial Scale Wind Facility Status Proposed Owner Cannon Power Group Developer Cannon Power Group Location Goldendale WA Coordinates 45.76201437°, -120.5455971° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.76201437,"lon":-120.5455971,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Windy Flats IIa extension | Open Energy Information  

Open Energy Info (EERE)

IIa extension IIa extension Jump to: navigation, search Name Windy Flats IIa extension Facility Windy Flats IIa extension Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Cannon Power Group Developer Cannon Power Group Location North shore of Columbia River Coordinates 45.699622°, -120.774622° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.699622,"lon":-120.774622,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

122

Shepherds Flat North | Open Energy Information  

Open Energy Info (EERE)

North North Jump to: navigation, search Name Shepherds Flat North Facility Shepherds Flat North Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer Caithness Energy Purchaser Southern California Edison Co Location Gilliam County OR Coordinates 45.73°, -120.056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.73,"lon":-120.056,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

123

Release fractions for Rocky Flats specific accidents  

SciTech Connect (OSTI)

As Rocky Flats and other DOE facilities begin the transition process towards decommissioning, the nature of the scenarios to be studied in safety analysis will change. Whereas the previous emphasis in safety accidents related to production, now the emphasis is shifting to accidents related tc decommissioning and waste management. Accident scenarios of concern at Rocky Flats now include situations of a different nature and different scale than are represented by most of the existing experimental accident data. This presentation will discuss approaches@to use for applying the existing body of release fraction data to this new emphasis. Mention will also be made of ongoing efforts to produce new data and improve the understanding of physical mechanisms involved.

Weiss, R.C.

1992-09-01T23:59:59.000Z

124

Release fractions for Rocky Flats specific accidents  

SciTech Connect (OSTI)

As Rocky Flats and other DOE facilities begin the transition process towards decommissioning, the nature of the scenarios to be studied in safety analysis will change. Whereas the previous emphasis in safety accidents related to production, now the emphasis is shifting to accidents related tc decommissioning and waste management. Accident scenarios of concern at Rocky Flats now include situations of a different nature and different scale than are represented by most of the existing experimental accident data. This presentation will discuss approaches to use for applying the existing body of release fraction data to this new emphasis. Mention will also be made of ongoing efforts to produce new data and improve the understanding of physical mechanisms involved.

Weiss, R.C.

1992-01-01T23:59:59.000Z

125

Shepherds Flat South | Open Energy Information  

Open Energy Info (EERE)

South South Jump to: navigation, search Name Shepherds Flat South Facility Shepherds Flat South Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer Caithness Energy Purchaser Southern California Edison Co Location Ione OR Coordinates 45.655°, -120.056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.655,"lon":-120.056,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

126

Basic TRUEX process for Rocky Flats Plant  

SciTech Connect (OSTI)

The Generic TRUEX Model was used to develop a TRUEX process flowsheet for recovering the transuranics (Pu, Am) from a nitrate waste stream at Rocky Flats Plant. The process was designed so that it is relatively insensitive to changes in process feed concentrations and flow rates. Related issues are considered, including solvent losses, feed analysis requirements, safety, and interaction with an evaporator system for nitric acid recycle.

Leonard, R.A.; Chamberlain, D.B.; Dow, J.A.; Farley, S.E.; Nunez, L.; Regalbuto, M.C.; Vandegrift, G.F.

1994-08-01T23:59:59.000Z

127

Status Update: Closing Rocky Flats by 2006  

SciTech Connect (OSTI)

Safely closing Rocky Flats by December 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy (DOE), Kaiser-Hill and its team of subcontractors, the site's employees and taxpayers across the country. This paper will: provide a status of the Closure Project to date; describe important accomplishments of the past year; describe some of the closure-enhancing technologies enabling acceleration; and discuss the remaining challenges ahead.

Tuor, N.; Schubert, A.

2003-02-25T23:59:59.000Z

128

Microwave solidification development for Rocky Flats waste  

SciTech Connect (OSTI)

The Microwave Engineering Team at the Rocky Flats Plant has developed a production-scale system for the treatment of hazardous, radioactive, and mixed wastes using microwave energy. The system produces a vitreous final form which meets the acceptance criteria for shipment and disposal. The technology also has potential for application on various other waste streams from the public and private sectors. Technology transfer opportunities are being identified and pursued for commercialization of the microwave solidification technology.

Dixon, D.; Erle, R.; Eschen, V. [and others

1994-04-01T23:59:59.000Z

129

SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Innovative Ballasted Flat Roof Innovative Ballasted Flat Roof Solar Photovoltaic Racking System to someone by E-mail Share SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic Racking System on Facebook Tweet about SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic Racking System on Twitter Bookmark SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic Racking System on Google Bookmark SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic Racking System on Delicious Rank SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic Racking System on Digg Find More places to share SunShot Initiative: Innovative Ballasted Flat Roof Solar Photovoltaic Racking System on AddThis.com... Concentrating Solar Power Photovoltaics

130

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

131

SLIDESHOW: Shepherds Flat Wind Farm | Department of Energy  

Energy Savers [EERE]

SLIDESHOW: Shepherds Flat Wind Farm SLIDESHOW: Shepherds Flat Wind Farm Addthis 1 of 5 Image: Caithness Energy 2 of 5 Image: Caithness Energy 3 of 5 Image: Caithness Energy 4 of 5...

132

Development of the NIST Rocky Flats Soil Standard  

Science Journals Connector (OSTI)

The National Institute of Standards and Technology (NIST) Rocky Flats Soil-II Standard reference material (SRM) ... values and uncertainties for the radionuclides in the Rocky Flats Soil II SRM.

S. Nour; K. Inn; J. Filliben

2008-07-01T23:59:59.000Z

133

Device for thermal transfer and power generation  

DOE Patents [OSTI]

A system is provided. The system includes a device that includes top and bottom thermally conductive substrates positioned opposite to one another, wherein a top surface of the bottom thermally conductive substrate is substantially atomically flat and a thermal blocking layer disposed between the top and bottom thermally conductive substrates. The device also includes top and bottom electrodes separated from one another between the top and bottom thermally conductive substrates to define a tunneling path, wherein the top electrode is disposed on the thermal blocking layer and the bottom electrode is disposed on the bottom thermally conductive substrate.

Weaver, Stanton Earl (Northville, NY); Arik, Mehmet (Niskayuna, NY)

2011-04-19T23:59:59.000Z

134

Mobile Device Guide Google Android based devices  

E-Print Network [OSTI]

Mobile Device Guide ­ Google Android based devices CSUF Date Last Revised: 1/20/11 Page 1 of 3;Mobile Device Guide ­ Google Android based devices CSUF Date Last Revised: 1/20/11 Page 2 of 3 2. Under' with your campus username and enter your password (case sensitive). 4. Tap `next'. #12;Mobile Device Guide

de Lijser, Peter

135

Geothermal: Sponsored by OSTI -- Telephone Flat Geothermal Development...  

Office of Scientific and Technical Information (OSTI)

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments Geothermal Technologies Legacy...

136

Using Backup Generators: Alternative Backup Power Options  

Broader source: Energy.gov [DOE]

In addition to electric generators powered by fuel, homeowners and business owners may consider alternative backup power options.

137

NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

E-Print Network [OSTI]

NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE AND THEIR CONSERVATION Methods 3 Rocky Flats Conservation Site Description 10 Walnut Creek Conservation Site Description 22 Rocky.S. Department of Energy's Rocky Flats Field Office for making this report possible. In particular, Dr. John

138

Converting Nested Algebra Expressions into Flat Algebra Expressions  

E-Print Network [OSTI]

Converting Nested Algebra Expressions into Flat Algebra Expressions JAN PAREDAENS University of Antwerp and DIRK VAN GUCHT Indiana University Nested relations generalize ordinary flat relations by allowing tuple values to be either atomic or set valued. The nested algebra is a generalization of the flat

Van Gucht, Dirk

139

Electrochromic device  

DOE Patents [OSTI]

An electrochromic device includes a first substrate spaced from a second substrate. A first conductive member is formed over at least a portion of the first substrate. A first electrochromic material is formed over at least a portion of the first conductive member. The first electrochromic material includes an organic material. A second conductive member is formed over at least a portion of the second substrate. A second electrochromic material is formed over at least a portion of the second conductive member. The second electrochromic material includes an inorganic material. An ionic liquid is positioned between the first electrochromic material and the second electrochromic material.

Schwendemanm, Irina G. (Wexford, PA); Polcyn, Adam D. (Pittsburgh, PA); Finley, James J. (Pittsburgh, PA); Boykin, Cheri M. (Kingsport, TN); Knowles, Julianna M. (Apollo, PA)

2011-03-15T23:59:59.000Z

140

OLED devices  

DOE Patents [OSTI]

An OLED device having an emission layer formed of an ambipolar phosphine oxide host material and a dopant, a hole transport layer in electrical communication with an anode, an electron transport layer in communication with a cathode, wherein the HOMO energy of the hole transport layer is substantially the same as the HOMO energy of the ambipolar host in the emission layer, and the LUMO energy of the electron transport layer is substantially the same as the LUMO energy of the ambipolar host in the emission layer.

Sapochak, Linda Susan [Arlington, VA; Burrows, Paul Edward [Kennewick, WA; Bimalchandra, Asanga [Richland, WA

2011-02-22T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Diversionary device  

DOE Patents [OSTI]

A diversionary device has a housing having at least one opening and containing a non-explosive propellant and a quantity of fine powder packed within the housing, with the powder being located between the propellant and the opening. When the propellant is activated, it has sufficient energy to propel the powder through the opening to produce a cloud of powder outside the housing. An igniter is also provided for igniting the cloud of powder to create a diversionary flash and bang, but at a low enough pressure to avoid injuring nearby people.

Grubelich, Mark C. (Albuquerque, NM)

2001-01-01T23:59:59.000Z

142

Hydrogen Delivery InfrastructureHydrogen Delivery Infrastructure Option AnalysisOption Analysis  

E-Print Network [OSTI]

Converting NG/oil pipelines for GH delivery Option 3 Blending GH into NG pipelines Option 4* GH tube trailers Option 5* LH tank trucks Option 6 Use of novel H2 carriers (alanate; chemical hydride; liquid hydrocarbon as CA) -- NG distribution lines: gas companies usually use for Class 3 & 4 No odorants used in current H

143

Forecourt Storage and Compression Options | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Storage and Compression Options Forecourt Storage and Compression Options Presentation by Mark Richards on forecourt storage and compression options. wkshpstoragerichards.pdf...

144

Introduction Flattening the Earth Continuation procedure Flat Earth Numerical simulations Continuation from a flat to a round Earth model  

E-Print Network [OSTI]

Introduction Flattening the Earth Continuation procedure Flat Earth Numerical simulations Continuation from a flat to a round Earth model in the coplanar orbit transfer problem M. Cerf1, T. Haberkorn, SADCO 2011, March 2nd M. Cerf, T. Haberkorn, E. Tr´elat Continuation from a flat to a round Earth model

Boyer, Edmond

145

Performance of Installed Cooking Exhaust Devices  

SciTech Connect (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) including exhaust fan/microwave combination appliances were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

146

Climate Financing Options | Open Energy Information  

Open Energy Info (EERE)

Financing Options Financing Options Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Financing Options Agency/Company /Organization: United Nations Development Programme (UNDP), World Bank Sector: Climate Focus Area: People and Policy Phase: Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals, Prepare a Plan, Develop Finance and Implement Projects Topics: Finance, Implementation, Low emission development planning, -LEDS, Policies/deployment programs Resource Type: Case studies/examples, Guide/manual, Training materials Website: www.climatefinanceoptions.org/cfo/ Language: English References: Climate Finance Options[1] New climate finance tool for developing countries[2] "This Platform aims at providing comprehensive guidance on financial

147

New Energy Options | Open Energy Information  

Open Energy Info (EERE)

Options Options Jump to: navigation, search Name New Energy Options Place Belo Horizonte, Minas Gerais, Brazil Sector Wind energy Product Belo Horizonte-based wind farm developer and independent electric energy producer. References New Energy Options[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. New Energy Options is a company located in Belo Horizonte, Minas Gerais, Brazil . References ↑ "New Energy Options" Retrieved from "http://en.openei.org/w/index.php?title=New_Energy_Options&oldid=349161" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties

148

DOE - Office of Legacy Management -- Rocky Flats SOG  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOG SOG Rocky Flats Site, Colorado Rocky Flats, Colorado, Site Operations Guide All documents are Adobe Acrobat files. pdf_icon Site Operations Guide Appendixes Appendix A: Annual Site Inspection Checklist Appendix B: Example Contact Record Appendix C: Rocky Flats Site Soil Disturbance Evaluation Procedure Appendix D: Site-Specific Checklist Appendix E: Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure Appendix F: Erosion Control Plan for Rocky Flats Property Central Operable Unit Appendix G: Wildland Fire Management Plan for the Rocky Flats, Colorado, Site Appendix H: Emergency Response Plan for the Rocky Flats Site Dams Appendix I: Additional Field Implementation Detail for Selected Monitoring Objectives Historic documents may contain links to outside sources. LM cannot attest

149

Independent Oversight Special Review, Rocky Flats Closure Project Site -  

Broader source: Energy.gov (indexed) [DOE]

Oversight Special Review, Rocky Flats Closure Project Oversight Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site The U.S. Department of Energy (DOE) Office of Independent Environment, Safety, and Health Oversight (EH-2), within the Office of Environment, Safety and Health, conducted an independent oversight Special Review at the Rocky Flats Closure Project (RFCP). The Special Review was conducted at the request of the Rocky Flats Field Office (RFFO), which is the DOE organizational element with responsibility for the RFCP (formerly known as the Rocky Flats Environmental Technology Site). Kaiser-Hill Company, LLC (KH) is the prime contractor for the RFCP.

150

Independent Oversight Special Review, Rocky Flats Closure Project Site -  

Broader source: Energy.gov (indexed) [DOE]

Special Review, Rocky Flats Closure Project Special Review, Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site The U.S. Department of Energy (DOE) Office of Independent Environment, Safety, and Health Oversight (EH-2), within the Office of Environment, Safety and Health, conducted an independent oversight Special Review at the Rocky Flats Closure Project (RFCP). The Special Review was conducted at the request of the Rocky Flats Field Office (RFFO), which is the DOE organizational element with responsibility for the RFCP (formerly known as the Rocky Flats Environmental Technology Site). Kaiser-Hill Company, LLC (KH) is the prime contractor for the RFCP. RFCP's project-oriented approach and aggressive scheduling have resulted

151

Cosmic string scaling in flat space  

Science Journals Connector (OSTI)

We investigate the evolution of infinite strings as a part of a complete cosmic string network in flat space. We perform a simulation of the network which uses functional forms for the string position and thus is exact to the limits of computer arithmetic. Our results confirm that the wiggles on the strings obey a scaling law described by universal power spectrum. The average distance between long strings also scales accurately with the time. These results suggest that small-scale structure will also scale in an expanding universe, even in the absence of gravitational damping.

Vitaly Vanchurin; Ken Olum; Alexander Vilenkin

2005-09-29T23:59:59.000Z

152

Repackaging Rocky Flats Legacy Transuranic Waste  

SciTech Connect (OSTI)

Repackaging legacy Transuranic (TRU), Transuranic Mixed (TRM), Low Level Waste (LLW), and Low Level Mixed (LLM) waste requires good characterization skills and the ability to adapt to less than ideal conditions. Repackaging legacy waste in a facility that is not undergoing Decontamination and Decommission (D and D) is optimum. However, repackaging any waste in a D and D facility, under cold and dark conditions, can be difficult. Cold and dark conditions are when the heating and air conditioning are no longer in service and the lighting consists of strands of lights hung throughout each of the rooms. Working under these conditions adds an additional level of stress and danger that must be addressed. The use of glovebags was very useful at Rocky Flats during the D and D of many buildings. Glovebags can be adapted for many different types of wastes and unusual conditions. Repackaging of legacy TRU waste, in a D and D facility, can be accomplished safely and cost effectively with the use of glovebags. In conclusion: the use of glovebags to repackage legacy TRU, TRM, LLW, or LLM waste was done safely and cost effectively at Rocky Flats. The cost of using glovebags was minimal. Glovebags are easily adaptable to whatever the waste configuration is. The use of glovebags, for repackaging of Legacy waste, allows D and D efforts to stay on schedule and on task. Without the use of glovebags, additional gloveboxes would have been required at Rocky Flats. Larger items, such as the HEPA filters, would have required the construction of a new large item repackaging glovebox. Repackaging in glovebags allows the freedom to either locate the glovebag by the waste or locate the glovebag in a place that least impacts D and D efforts. The use of glovebags allowed numerous configurations of waste to be repackaged without the use of gloveboxes. During the D and D of the Rocky Flats facility, which was in a cold and dark stage, D and D work was not impacted by the repackaging activity. Glovebags work well in facilities that are in the process of D and D or still in full operations because glovebags are very safe and cost effective.

McTaggart, Jerri Lynne [Los Alamos National Laboratory, 115 N. Main St., Carlsbad, New Mexico, 88220 (United States)

2008-01-15T23:59:59.000Z

153

Optoelectronic device  

DOE Patents [OSTI]

The invention is an optoelectronic device comprising an active portion which converts light to electricity or converts electricity to light, the active portion having a front side for the transmittal of the light and a back side opposite from the front side, at least two electrical leads to the active portion to convey electricity to or from the active portion, an enclosure surrounding the active portion and through which the at least two electrical leads pass wherein the hermetically sealed enclosure comprises at the front side of the active portion a barrier material which allows for transmittal of light, one or more getter materials disposed so as to not impede the transmission of light to or from the active portion, and a contiguous gap pathway to the getter material which pathway is disposed between the active portion and the barrier material.

Bonekamp, Jeffrey E.; Boven, Michelle L.; Gaston, Ryan S.

2014-09-09T23:59:59.000Z

154

Performance of Installed Cooking Exhaust Devices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

155

Disposal of Rocky Flats residues as waste  

SciTech Connect (OSTI)

Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

Dustin, D.F.; Sendelweck, V.S. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Rivera, M.A. [Lamb Associates, Inc., Rockville, MD (United States)

1993-03-01T23:59:59.000Z

156

Disposal of Rocky Flats residues as waste  

SciTech Connect (OSTI)

Work is underway at the Rocky Flats Plant to evaluate alternatives for the removal of a large inventory of plutonium-contaminated residues from the plant. One alternative under consideration is to package the residues as transuranic wastes for ultimate shipment to the Waste Isolation Pilot Plant. Current waste acceptance criteria and transportation regulations require that approximately 1000 cubic yards of residues be repackaged to produce over 20,000 cubic yards of WIPP certified waste. The major regulatory drivers leading to this increase in waste volume are the fissile gram equivalent, surface radiation dose rate, and thermal power limits. In the interest of waste minimization, analyses have been conducted to determine, for each residue type, the controlling criterion leading to the volume increase, the impact of relaxing that criterion on subsequent waste volume, and the means by which rules changes may be implemented. The results of this study have identified the most appropriate changes to be proposed in regulatory requirements in order to minimize the costs of disposing of Rocky Flats residues as transuranic wastes.

Dustin, D.F.; Sendelweck, V.S. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant); Rivera, M.A. (Lamb Associates, Inc., Rockville, MD (United States))

1993-01-01T23:59:59.000Z

157

Ghost condensate model of flat rotation curves  

E-Print Network [OSTI]

An effective action of ghost condensate with higher derivatives creates a source of gravity and mimics a dark matter in spiral galaxies. We present a spherically symmetric static solution of Einstein--Hilbert equations with the ghost condensate at large distances, where flat rotation curves are reproduced in leading order over small ratio of two energy scales characterizing constant temporal and spatial derivatives of ghost field: $\\mu_*^2$ and $\\mu_\\star^2$, respectively, with a hierarchy $\\mu_\\star\\ll \\mu_*$. We assume that a mechanism of hierarchy is provided by a global monopole in the center of galaxy. An estimate based on the solution and observed velocities of rotations in the asymptotic region of flatness, gives $\\mu_*\\sim 10^{19}$ GeV and the monopole scale in a GUT range $\\mu_\\star\\sim 10^{16}$ GeV, while a velocity of rotation $v_0$ is determined by the ratio: $ \\sqrt{2} v_0^2= \\mu_\\star^2/\\mu_*^2$. A critical acceleration is introduced and naturally evaluated of the order of Hubble rate, that represents the Milgrom's acceleration.

V. V. Kiselev

2005-07-29T23:59:59.000Z

158

Immobilization of Rocky Flats Graphite Fines Residues  

SciTech Connect (OSTI)

The Savannah River Technology Center (SRTC) is developing an immobilization process for graphite fines residues generated during nuclear materials production activities at the Rocky Flats Environmental Technology Site (Rocky Flats). The continued storage of this material has been identified as an item of concern. The residue was generated during the cleaning of graphite casting molds and potentially contains reactive plutonium metal. The average residue composition is 73 wt percent graphite, 15 wt percent calcium fluoride (CaF2), and 12 wt percent plutonium oxide (PuO2). Approximately 950 kilograms of this material are currently stored at Rocky Flats. The strategy of the immobilization process is to microencapsulate the residue by mixing with a sodium borosilicate (NBS) glass frit and heating at nominally 700 degrees C. The resulting waste form would be sent to the Waste Isolation Pilot Plant (WIPP) for disposal. Since the PuO2 concentration in the residue averages 12 wt percent, the immobilization process was required to meet the intent of safeguards termination criteria by limiting plutonium recoverability based on a test developed by Rocky Flats. The test required a plutonium recovery of less than 4 g/kg of waste form when a sample was leached using a nitric acid/CaF2 dissolution flowsheet. Immobilization experiments were performed using simulated graphite fines with cerium oxide (CeO2) as a surrogate for PuO2 and with actual graphite fines residues. Small-scale surrogate experiments demonstrated that a 4:1 frit to residue ratio was adequate to prevent recovery of greater than 4 g/kg of cerium from simulated waste forms. Additional experiments investigated the impact of varying concentrations of CaF2 and the temperature/heating time cycle on the cerium recovery. Optimal processing conditions developed during these experiments were subsequently demonstrated at full-scale with surrogate materials and on a smaller scale using actual graphite fines.In general, the recovery of cerium from the full-scale waste forms was higher than for smaller scale experiments. The presence of CaF2 also caused a dramatic increase in cerium recovery not seen in the small-scale experiments. However, the results from experiments with actual graphite fines were encouraging. A 4:1 frit to residue ratio, a temperature of 700 degrees C, and a 2 hr heating time produced waste forms with plutonium recoveries of 4 plus/minus 1 g/kg. With an increase in the frit to residue ratio, waste forms fabricated at this scale should meet the Rocky Flats product specification. The scale-up of the waste form fabrication process to nominally 3 kg is expected to require a 5:1 to 6:1 frit to residue ratio and maintaining the waste form centerline temperature at 700 degrees C for 2 hr.

Rudisill, T. S.

1998-11-06T23:59:59.000Z

159

Investigation of structural and electrical properties of flat a-Si/c-Si heterostructure fabricated by EBPVD technique  

SciTech Connect (OSTI)

Flat amorphous silicon - crystal silicon (a-Si/c-Si) heterostructure were prepared by ultra-high vacuum electron beam evaporation technique on p-Si (111) and n-Si (100) single crystal substrates. Structural analyses were investigated by XRD, Raman and FEG-SEM analysis. With these analyses we determined that at the least amorphous structure shows modification but amorphous structure just protected. The electrical and photovoltaic properties of flat a-Si/c-Si heterojunction devices were investigated with current-voltage characteristics under dark and illumination conditions. Electrical properties of flat a-Si/c-Si heterorojunction; such as barrier height ?{sub B}, diode ideality factor ? were determined from current-voltage characteristics in dark conditions. These a-Si/c-Si heterostructure have good rectification behavior as a diode and exhibit high photovoltaic sensitivity.

Demiro?lu, D. [Department of Metallurgical and Materials Engineering, Istanbul Technical University, Ayaza?a 34469, Istanbul (Turkey); Tatar, B. [Faculty of Arts and Sciences, Department of Physics, Nam?k Kemal University, De?irmenalt?, Tekirda? (Turkey); Kazmanli, K.; Urgen, M. [Department of Metallurgical and Materials Engineering, Istanbul Technical University, Ayaza?a 34469, Istanbul (Turkey)

2013-12-16T23:59:59.000Z

160

Nitrogen Oxides Emission Control Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nitrogen Nitrogen Oxides Emission Control Options for Coal-Fired Electric Utility Boilers Ravi K. Srivastava and Robert E. Hall U.S. Environmental Protection Agency, National Risk Management Research Laboratory, Air Pollution Prevention and Control Division, Research Triangle Park, NC Sikander Khan and Kevin Culligan U.S. Environmental Protection Agency, Office of Air and Radiation, Clean Air Markets Division, Washington, DC Bruce W. Lani U.S. Department of Energy, National Energy Technology Laboratory, Environmental Projects Division, Pittsburgh, PA ABSTRACT Recent regulations have required reductions in emissions of nitrogen oxides (NO x ) from electric utility boilers. To comply with these regulatory requirements, it is increas- ingly important to implement state-of-the-art NO x con- trol technologies on coal-fired utility boilers. This paper reviews NO x control

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

3 - Options for this Decade  

Science Journals Connector (OSTI)

Heavy public debt has been one of the most important reasons why over 5 to 6 years the economic and social structure of western society has been under stress. Unemployment zoomed and then remained at high level, while national income is lower than what would have been expected in an average recovery. This provides politicians and common citizens with three options, in line of diminishing likelihood: Continue meddling through hoping to buy time, A slow, very slow, improvement of the economy and in employment, and A global perfect storm leading to a new economic depression. The meddling through scenarios is the more likely. Steady improvement has lower probability and is optimistic, based on the hypothesis that Euroland finds its way toward a greater economic, financial, fiscal, and political union; the US economy is improving albeit at slow pace; China has a soft landing, and many of the developing countries resume their growth; also there is no war in the Middle East.

Dimitris N. Chorafas

2014-01-01T23:59:59.000Z

162

Hydrogen Production Infrastructure Options Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Production Production Infrastructure Options Analysis January 26, 2006 Brian D. James Julie Perez Peter Schmidt (703) 243 - 3383 Brian_James@DirectedTechnologies.com Directed Technologies, Inc. Page 1 of 39 26 January 2006 2006-1-26 DOE Transition Workshop Agenda 1. Project Description and Objective 2. Team Members 3. Approach 4. Model Theory, Structure and Assumptions 5. Model Description 1. Logic 2. Features 3. Cost Components (Production, Delivery & Dispensing) 6. Los Angeles Transitional Example 7. Model Flexibility Page 2 of 39 26 January 2006 2006-1-26 DOE Transition Workshop Team Members & Interactions Start: May 2005 (effective) End: Summer 2007 * Directed Technologies, Inc.- Prime * Sentech, Inc., Research Partner * Air Products, Industrial Gas Supplier * Advisory Board * Graham Moore, Chevron Technology Ventures

163

Project investment supporting by real options  

Science Journals Connector (OSTI)

Research work of Trigeorgis in 2002 brought to a method which enabled appropriate evaluation of options in the circumstances of uncertainty. This resulted in great increase of research in the field of evaluating financial assets. A possibility of evaluating so-called financial options was interesting not only to academics, but also was accepted in the field of business systems and project management. This is a survey of basic terms and logic for evaluating financial options.

Peter Meza

2009-01-01T23:59:59.000Z

164

DOE's Former Rocky Flats Weapons Production Site to Become National  

Broader source: Energy.gov (indexed) [DOE]

Former Rocky Flats Weapons Production Site to Become National Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge DOE's Former Rocky Flats Weapons Production Site to Become National Wildlife Refuge July 12, 2007 - 2:54pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the transfer of nearly 4,000 acres of its former Rocky Flats nuclear weapons production site to the Department of the Interior's (DOI) U.S. Fish and Wildlife Service (FWS) for use as a National Wildlife Refuge. After more than a decade of environmental cleanup work, the transfer creates the Rocky Flats National Wildlife Refuge, 16 miles northwest of Denver, Colorado, and marks completion of the regulatory milestones to transform a formerly contaminated site into an environmental asset. "The Department of Energy's environmental cleanup of the Rocky Flats

165

Salt Wells, Eight Mile Flat | Open Energy Information  

Open Energy Info (EERE)

Salt Wells, Eight Mile Flat Salt Wells, Eight Mile Flat Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells, Eight Mile Flat Abstract Abstract unavailable. Author Nevada Bureau of Mines and Geology Published Online Nevada Encyclopedia, 2009 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Salt Wells, Eight Mile Flat Citation Nevada Bureau of Mines and Geology. Salt Wells, Eight Mile Flat [Internet]. 2009. Online Nevada Encyclopedia. [updated 2009/03/24;cited 2013/08/07]. Available from: http://www.onlinenevada.org/articles/salt-wells-eight-mile-flat Related Geothermal Exploration Activities Activities (1) Areas (1) Regions (0) Development Wells At Salt Wells Area (Nevada Bureau of Mines and Geology, 2009) Salt Wells Geothermal Area

166

Flat-Plate Photovoltaic System Basics | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Flat-Plate Photovoltaic System Basics Flat-Plate Photovoltaic System Basics Flat-Plate Photovoltaic System Basics August 20, 2013 - 4:03pm Addthis The most common photovoltaic (PV) array design uses flat-plate PV modules or panels. These panels can be fixed in place or allowed to track the movement of the Illustration of a cutaway of a typical flat-plate module. The layers, in order from top to bottom, are: cover film, solar cell, encapsulant, substrate, cover film, seal, gasket, and frame. One typical flat-plate module design uses a substrate of metal, glass, or plastic to provide structural support in the back; an encapsulant material to protect the cells; and a transparent cover of plastic or glass. sun. They respond to sunlight that is direct or diffuse. Even in clear skies, the diffuse component of sunlight accounts for between 10% and 20%

167

Biochemistry, Research Option BS Degree Completion Checklist  

E-Print Network [OSTI]

____ CHEM 4601 ____ Biology Electives: 9 hours 4701 _____ LCC 4702 _____ Free Electives: ____ hours petition. Note on CHEM 4698 vs. 4699 CHEM 4698 does count toward the Research Option designation

Sherrill, David

168

Final Report- Hydrogen Delivery Infrastructure Options Analysis  

Broader source: Energy.gov [DOE]

This report provides in-depth analysis of various hydrogen delivery options to determine the most cost effective infrastructure and R&D efforts for the long term.

169

Automated Surface Observing System: Standby Power Options  

Energy Savers [EERE]

for pilot briefing, air traffic control, & weather forecasters Public access dial phone lines Initially UPS designed to back 3 options under consideration to extend backup power to...

170

PC Electronic Data Reporting Option (PEDRO) System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

System Released: February 22, 2011 Download Pedro Application Patch Archive Background The PC Electronic Data Reporting Option, or PEDRO, system enables users to enter Energy...

171

Sagebrush Flat Wildlife Area 2008 Annual Report.  

SciTech Connect (OSTI)

The Sagebrush Flat Wildlife Area is a 12,718 acre complex located in Douglas County, Washington. Four distinct management units make up the area: Bridgeport, Chester Butte, Dormaier and Sagebrush Flat. The four Units are located across a wide geographic area within Douglas County. The Units are situated roughly along a north/south line from Bridgeport in the north to the Douglas/Grant county line in the south, 60 miles away. The wildlife area was established to conserve and enhance shrubsteppe habitat for the benefit shrubsteppe obligate and dependent wildlife species. In particular, the Sagebrush Flat Wildlife Area is managed to promote the recovery of three state-listed species: Columbian sharp-tailed grouse (threatened), greater sage grouse (threatened) and the pygmy rabbit (endangered). The US Fish and Wildlife Service also list the pygmy rabbit as endangered. Wildlife area staff seeded 250 acres of old agricultural fields located on the Sagebrush Flat, Dormaier and Chester Butte units. This has been a three project to reestablish high quality shrubsteppe habitat on fields that had either been abandoned (Dormaier) or were dominated by non-native grasses. A mix of 17 native grasses and forbs, most of which were locally collected and grown, was used. First year maintenance included spot spraying Dalmatian toadflax on all sites and mowing annual weeds to reduce competition. Photo points were established and will be integral to long term monitoring and evaluation. Additional monitoring and evaluation will come from existing vegetation transects. This year weed control efforts included spot treatment of noxious weeds, particularly Dalmatian toadflax, in previously restored fields on the Bridgeport Unit (150 acres). Spot treatment also took place within fields scheduled for restoration (40 acres) and in areas where toadflax infestations are small and relatively easily contained. Where toadflax is so widespread that chemical treatment would be impractical, we use the bioagent Mecinus janthinus, available through Professor Gary Piper of Washington State University. This year we released 4,000 M. janthinus on the Bridgeport Unit at 6 separate locations. Since 2002 we have released approximately 14,400 of these insects, 80% of these on the Bridgeport Unit. Additional weed control activities included mowing and spot spraying more than 32 miles of roads, cutting and removal of annual weeds within fenced deer exclosures. We upgraded the solar powered irrigation system that supplies water to a stand of water birch trees planted in 2002. Wildlife area staff designed and built a new solar array and installed a higher capacity pump. The increased capacity will ensure that these trees receive adequate water through the hot summer months and allow us to create at least one additional stand. This project is an important part in our effort to expand the available winter habitat for sharp-tailed grouse on the Bridgeport Unit. Maintenance of fences, parking areas and roads continued during throughout the year. Two parking areas, at Chester Butte and Bridgeport, were graded and additional gravel added. Roads on the Bridgeport Unit were graded and repaired following spring runoff. Trespass and dumping issues have increased in recent years on the Bridgeport Unit. To address these problems we constructed four steel gates at access points on this unit. Each gate is tubular steel attached to 8-inch diameter steel posts, 10 feet long that are cemented into the ground. Two gates allow access to BPA substation facilities and power-line right-of ways so placement, construction and locking issues had to be coordinated with BPA's Real Estate staff in Spokane. Environmental Compliance Documentation issues were addressed again this year. This process has the potential to cause delays the completion of projects within the fiscal year. With this in mind and an eye toward the future, we requested that several projects planned for the coming years be surveyed this year. Beginning in August of 2007, area staff worked with BPA staff to identify work elements

Peterson, Dan [Washington Department of Fish and Wildlife

2008-11-03T23:59:59.000Z

172

Rocky Flats Closure Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

Sanford, P.C. [1129 Business Parkway South, Westminister, MD (United States); Skokan, B. [United States Department of Energy, Washington, DC (United States)

2007-07-01T23:59:59.000Z

173

3D Flat Holography: Entropy and Logarithmic Corrections  

E-Print Network [OSTI]

We compute the leading corrections to the Bekenstein-Hawking entropy of the Flat Space Cosmological (FSC) solutions in 3D flat spacetimes, which are the flat analogues of the BTZ black holes in AdS3. The analysis is done by a computation of density of states in the dual 2D Galilean Conformal Field Theory and the answer obtained by this matches with the limiting value of the expected result for the BTZ inner horizon entropy as well as what is expected for a generic thermodynamic system. Along the way, we also develop other aspects of holography of 3D flat spacetimes.

Arjun Bagchi; Rudranil Basu

2013-12-19T23:59:59.000Z

174

Digital Video Bandwidth Requirements for Large Flat-Panel Televisions  

Science Journals Connector (OSTI)

Consumer expectations for high quality high-definition programming will place greater demand on access networks as flat-panel display sizes increase. Herein, we investigate the...

Ruffin, A B

175

EIS-0276: Rocky Flats Plutonium Storage, Golden, Colorado  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action to provide safe interim storage of approximately 10 metric tons of plutonium at the Rocky Flats Environmental Technology Site (RFETS).

176

2006 Annual Ecology Report for the Rocky Flats Site  

Office of Legacy Management (LM)

Ecology Report for the Rocky Flats Site Click on the links below to access different portions of the electronic annual report. 2006 Annual Report Sections Diffuse Knapweed...

177

Unique process combination decontaminates mixed wastewater at Rocky Flats  

SciTech Connect (OSTI)

This paper describes the Sitewide Water Treatment Facility (SWTF) used to process environmental remediation wastewaters found at the Rocky Flats Environmental Technology Site.

Kelso, William J.; Cirillo, J. Russ

1999-08-01T23:59:59.000Z

178

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance...  

Office of Legacy Management (LM)

Site. LM provides periodic communications through several means, such as this report, web-based tools, and public meetings. LM prepared the Rocky Flats, Colorado, Site Site...

179

Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance  

Office of Legacy Management (LM)

Site. LM provides periodic communications through several means, such as this report, web-based tools, and public meetings. LM prepared the Rocky Flats, Colorado, Site Site...

180

Fabrication and optimization of light emitting devices with core-shell quantum dots  

E-Print Network [OSTI]

Quantum dot light emitting devices (QD-LEDs) are promising options for the next generation of solid state lighting, color displays, and other optoelectronic applications. Overcoating quantum dots (QDs) -- semiconducting ...

Song, Katherine Wei

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Diamonds are an Electronic Device's Best Friend | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Diamonds are an Electronic Device's Best Friend Diamonds are an Electronic Device's Best Friend Diamonds are an Electronic Device's Best Friend April 17, 2012 - 11:43am Addthis Ultrananocrystalline diamond has a diverse range of applications from the next generation of high-definition flat panel displays to coatings for mechanical pump seals and tools. | Photo courtesy of Argonne National Lab Ultrananocrystalline diamond has a diverse range of applications from the next generation of high-definition flat panel displays to coatings for mechanical pump seals and tools. | Photo courtesy of Argonne National Lab Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science How does it work? As computer performance has improved, engineers have had a hard time dissipating the heat produced. Diamond film may be the answer, as it's much better at absorbing and

182

A new option in ECE @ UBC The Biomedical Engineering (BE) option offers  

E-Print Network [OSTI]

A new option in ECE @ UBC The Biomedical Engineering (BE) option offers the opportunity to gain core competency in fundamental electrical engineering topics, key topics in biomedical engineering on the Biomedical Engineering option: Student Services Electrical & Computer Engineering The University of British

Pulfrey, David L.

183

Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity Service  

E-Print Network [OSTI]

Combining Financial Double Call Options with Real Options for Early Curtailment of Electricity@IEOR.Berkeley.edu Abstract In a competitive electricity market traditional demand side management options offering customers curtailable service at reduced rates are replaced by voluntary customer responses to electricity spot prices

184

architecture 2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option  

E-Print Network [OSTI]

credits) 1 environmental technology course (3 credits) 2 architectural history courses (6 credits) 3master of architecture (M.Arch.) #12;2-year master of architecture option deadlinesmaster of architecture 3-year master of architecture option Taubman College's 2-year master of architecture option

Papalambros, Panos

185

Climate Finance Options Platform | Open Energy Information  

Open Energy Info (EERE)

Climate Finance Options Platform Climate Finance Options Platform Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Finance Options Agency/Company /Organization: United Nations Development Programme, World Bank Sector: Energy, Land Topics: Finance, Implementation Resource Type: Dataset Website: www.climatefinanceoptions.org/cfo/ Climate Finance Options Screenshot References: CFO[1] "This Platform aims at providing comprehensive guidance on financial options available for climate action in developing countries. Here you can find information on where to access the wide range of funds available from multilateral and bilateral institution, as well as public and private sources. Learn more on how these funds are governed and whether your project is eligible. Users are invited to be a resource to share their

186

Commercial Decommissioning at DOE's Rocky Flats  

SciTech Connect (OSTI)

Due in large part to the number of nuclear facilities that make up the DOE complex, DOE-EM work has historically been paperwork intensive and driven by extensive regulations. Requirements for non-nuclear facilities are often grouped with those of nuclear facilities, driving up costs. Kaiser-Hill was interested in applying a commercial model to demolition of these facilities and wanted to apply necessary and sufficient standards to the work activities, but avoid applying unnecessary requirements. Faced with demolishing hundreds of uncontaminated or non-radiologically contaminated facilities, Kaiser-Hill has developed a subcontracting strategy to drastically reduce the cost of demolishing these facilities at Rocky Flats. Aiming to tailor the demolition approach of such facilities to more closely follow commercial practices, Kaiser-Hill recently released a Request for Proposals (RFP) for the demolition of the site's former central administration facility. The RFP significantly reduced requirements for compliance with specific DOE directives. Instead, the RFP required subcontractors to comply with health and safety requirements commonly found in the demolition of similar facilities in a commercial setting. This resulted in a number of bids from companies who have normally not bid on DOE work previously and at a reduced cost over previous approaches. This paper will discuss the details of this subcontracting strategy.

Freiboth, C.; Sandlin, N.; Schubert, A.; Hansen, S.

2002-02-25T23:59:59.000Z

187

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Broader source: Energy.gov (indexed) [DOE]

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

188

Independent Oversight Review, Rocky Flats Environmental Technology Site -  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Environmental Technology Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review and a follow-up review of the emergency management program at Rocky Flats Environmental Technology Site (RFETS) in February 2000. The primary purpose of this review was to assess the effectiveness of the Department's emergency management programs for transportation events involving hazardous materials (not related to transuranic waste or nuclear

189

EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology  

Broader source: Energy.gov (indexed) [DOE]

46: Radioactive Waste Storage at Rocky Flats Environmental 46: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado EA-1146: Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to convert buildings at the U.S. Department of Energy Rocky Flats Environmental Technology Site from their former uses to interim waste storage facilities in order to increase storage capacity for low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 9, 1996 EA-1146: Finding of No Significant Impact Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado

190

Independent Oversight Review, Rocky Flats Environmental Technology Site -  

Broader source: Energy.gov (indexed) [DOE]

Independent Oversight Review, Rocky Flats Environmental Technology Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review and a follow-up review of the emergency management program at Rocky Flats Environmental Technology Site (RFETS) in February 2000. The primary purpose of this review was to assess the effectiveness of the Department's emergency management programs for transportation events involving hazardous materials (not related to transuranic waste or nuclear

191

West Ford Flat Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Ford Flat Geothermal Facility Ford Flat Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home West Ford Flat Geothermal Facility General Information Name West Ford Flat Geothermal Facility Facility West Ford Flat Sector Geothermal energy Location Information Location Clear Lake, California Coordinates 38.788136285865°, -122.72210240364° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.788136285865,"lon":-122.72210240364,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

192

Microsoft Word - RockyFlatsPropLR111406.doc  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2006 November 15, 2006 REPLY TO ATTN OF: IG-40 SUBJECT: Letter Report on "Alleged Waste of Funds Involving Excess Property at Rocky Flats" (INS-L-07-03) TO: Assistant Secretary for Environmental Management This is to advise you of the results of an Office of Inspector General inspection of alleged waste of funds involving excess property at the Department of Energy's (DOE's) Rocky Flats site. BACKGROUND Nuclear weapons production operations at Rocky Flats were discontinued in 1992. Subsequently, responsibility for Rocky Flats was reassigned from the Department's Office of Defense Programs to the Office of Environmental Management. In January 2000, DOE entered into a contract with Kaiser-Hill Company, LLC, for the closure of Rocky Flats by

193

Local Option - Special Districts | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Special Districts Local Option - Special Districts Local Option - Special Districts < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Cooling Sealing Your Home Ventilation Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Windows, Doors, & Skylights Bioenergy Solar Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Heating Wind Program Info State Florida Program Type PACE Financing '''''Note: The Federal Housing Financing Agency (FHFA) issued a [http://www.fhfa.gov/webfiles/15884/PACESTMT7610.pdf statement] in July 2010 concerning the senior lien status associated with most PACE programs. In response to the FHFA statement, most local PACE programs have been

194

Electron beam directed energy device and methods of using same  

DOE Patents [OSTI]

A method and apparatus is disclosed for an electron beam directed energy device. The device consists of an electron gun with one or more electron beams. The device includes one or more accelerating plates with holes aligned for beam passage. The plates may be flat or preferably shaped to direct each electron beam to exit the electron gun at a predetermined orientation. In one preferred application, the device is located in outer space with individual beams that are directed to focus at a distant target to be used to impact and destroy missiles. The aimings of the separate beams are designed to overcome Coulomb repulsion. A method is also presented for directing the beams to a target considering the variable terrestrial magnetic field. In another preferred application, the electron beam is directed into the ground to produce a subsurface x-ray source to locate and/or destroy buried or otherwise hidden objects including explosive devices.

Retsky, Michael W. (Trumbull, CT)

2007-10-16T23:59:59.000Z

195

PHOTO OPTION CURRICULUM (FOR STUDENTS ENTERING FALL, 2011 OR LATER)  

E-Print Network [OSTI]

PHOTO OPTION CURRICULUM (FOR STUDENTS ENTERING FALL, 2011 OR LATER) NOTE ON REVERSE. GATE REQUIREMENTS FOR PHOTO OPTION: FILM 100IH ­ Introduction to Film)..................................................................3 PHOTO OPTION REQUIREMENTS (GATE REQUIRED FOR MOST COURSES): PHOT 255

Dyer, Bill

196

Rolling Up a Put Option as Prices Increase  

E-Print Network [OSTI]

Agricultural producers use put options to protect themselves against declining prices. The technique of "rolling up a put option, explained in this publication, allows the producer to raise the minimum expected selling price of a put option...

Johnson, Jason; Polk, Wade

2008-10-07T23:59:59.000Z

197

An alternative viewpoint on energy options  

Science Journals Connector (OSTI)

The purpose of this short article is to point out some of the inaccurate statements made at a forum rather than to provide a comprehensive discussion of the availability energy options.

Buddhadev Sen

1981-01-01T23:59:59.000Z

198

Nuclear Power: The Last Best Option  

Science Journals Connector (OSTI)

Nuclear Power: The Last Best Option ... I never thought Id favor nuclear power. ... Nuclear power must occupy a larger share of our energy mix and replace coal-fired power plants. ...

Jerald L. Schnoor

2013-03-14T23:59:59.000Z

199

Policy Option for Hydrogen Vehicles and Infrastructure  

Broader source: Energy.gov (indexed) [DOE]

low CO 2 - H 2 pathways and efficient FCVs Policy Options for Early Transition Producer fuel payment 13 Experience with ethanol suggests that the price of gasoline is an...

200

Refiner options for converting and utilizing heavy fuel oil  

SciTech Connect (OSTI)

Ongoing advances in established technologies, together with recent commercial applications of residue fluid catalytic cracking (RFCC), automated residue demetallization, solvent deasphalting and gasification of pitch and coke, have markedly enhanced options for processing and economically using residues. Key long-term driving forces for processing strategies are: the need for flexibility to handle heavy, high-metals crude oils, and the economic benefit of being able to convert low-value residues to high-value light transportation fuels, hydrogen and electric power. Narrowing light/heavy crude oil price differentials and relatively low crude oil price levels since the early 1990s until the first quarter of 1996 have slowed the addition of new bottom-of-the-barrel conversion projects over the past two years. At the same time, world crude oil demand has increased at an annual average rate of nearly one million barrels/day (MMbpd) since 1985. Some major producer/refining companies forecast this rate of increase to continue well into the next decade. The inevitable net result will be the increased production of heavier crude oils. The authors project that this will be accompanied by flat or declining markets for heavy fuel oil and a resultant need for additional residue conversion/utilization capacity. The paper discusses technology application and status, economic observations, and technology outlook.

Dickenson, R.L.; Biasca, F.E.; Schulman, B.L.; Johnson, H.E. [SFA Pacific, Inc., Mountain View, CA (United States)

1997-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Solar Easements and Local Option Solar Rights Laws | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Solar Easements and Local Option Solar Rights Laws Solar Easements and Local Option Solar Rights Laws Solar Easements and Local Option Solar Rights Laws < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Program Info State New York Program Type Solar/Wind Access Policy New York's real property laws allow for the creation of solar easements. Like those in many other states, these are voluntary contracts which must be entered into in order to ensure uninterrupted solar access for solar energy devices. Solar easement agreements are required at a minimum to contain information describing the easement location and orientation to

202

Natural Gas Utilities Options Analysis for the Hydrogen Economy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Natural Gas Utilities Options Analysis for the Hydrogen Economy Natural Gas Utilities Options Analysis for the Hydrogen Economy Presentation by 12-Richards to DOE Hydrogen Pipeline...

203

Natural Gas Utilities Options Analysis for the Hydrogen Economy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Natural Gas Utilities Options Analysis for the Hydrogen Economy Natural Gas Utilities Options Analysis for the Hydrogen Economy Objectives: Identify business opportunities and...

204

Tool to Compare Solar Energy Program Financing Options | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Information Resources Tool to Compare Solar Energy Program Financing Options Tool to Compare Solar Energy Program Financing Options This model is intended to be used for...

205

Energy Efficiency Policy Rules: Options and Alternatives for...  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Policy Rules: Options and Alternatives for Illinois Energy Efficiency Policy Rules: Options and Alternatives for Illinois Chuck Goldman (LBNL) & Rich Sedano (RAP). ICC...

206

POLICY OPTIONS FOR FCV MARKET INTRODUCTION | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

POLICY OPTIONS FOR FCV MARKET INTRODUCTION POLICY OPTIONS FOR FCV MARKET INTRODUCTION Presentation by K.G. Duleep of Energy and Environmental Analysis, Inc. at the 2010 - 2025...

207

Waste Heat Management Options for Improving Industrial Process...  

Broader source: Energy.gov (indexed) [DOE]

of waste heat streams, and options for recovery including Combined Heat and Power. Waste Heat Management Options for Improving Industrial Process Heating Systems...

208

Hydrogen Delivery Options and Issues | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Delivery Options and Issues Hydrogen Delivery Options and Issues Presentation by DOE's Mark Paster at the 2010 - 2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and...

209

Renewable Power Options for Electricity Generation on Kaua'i...  

Office of Environmental Management (EM)

Renewable Power Options for Electricity Generation on Kaua'i: Economics and Performance Modeling Renewable Power Options for Electricity Generation on Kaua'i: Economics and...

210

Brochure HI Standards Subscription Options | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

HI Standards Subscription Options Brochure HI Standards Subscription Options HI's Web-based Standards "packages" will provide you with all of the Standards appropriate for a...

211

Comparative analyses of spent nuclear fuel transport modal options: Transport options under existing site constraints  

SciTech Connect (OSTI)

The movement of nuclear waste can be accomplished by various transport modal options involving different types of vehicles, transport casks, transport routes, and intermediate intermodal transfer facilities. A series of systems studies are required to evaluate modal/intermodal spent fuel transportation options in a consistent fashion. This report provides total life-cycle cost and life-cycle dose estimates for a series of transport modal options under existing site constraints. 14 refs., 7 figs., 28 tabs.

Brentlinger, L.A.; Hofmann, P.L.; Peterson, R.W.

1989-08-01T23:59:59.000Z

212

Left invertibility, flatness and identifiability of switched linear dynamical systems: a framework  

E-Print Network [OSTI]

Left invertibility, flatness and identifiability of switched linear dynamical systems: a framework invertibility and flatness, dynamical systems are structurally equivalent to some specific cryptographic invertibility, flatness and identifiability of discrete- time switched linear systems are investigated

Paris-Sud XI, Université de

213

Isotropic and deviatoric characterization of the Coalora nuclear explosion in Yucca Flats  

Science Journals Connector (OSTI)

......detonated at Yucca Flats, Nevada Test Site (NTS), are utilized...detonated at Yucca Flats, Nevada Test Site (NTS), are utilized...at the Novaya Zemlya test sites, Bull. seism. Soc...Structure at Yucca Flat, Nevada, Geophysics, 53......

Brian W. Stump; Robert E. Reinke; Kenneth H. Olsen; Lane R. Johnson

1994-03-01T23:59:59.000Z

214

Device Optimization and Transient Electroluminescence Studies of Organic light Emitting Devices  

SciTech Connect (OSTI)

Organic light emitting devices (OLEDs) are among the most promising for flat panel display technologies. They are light, bright, flexible, and cost effective. And while they are emerging in commercial product, their low power efficiency and long-term degradation are still challenging. The aim of this work was to investigate their device physics and improve their performance. Violet and blue OLEDs were studied. The devices were prepared by thermal vapor deposition in high vacuum. The combinatorial method was employed in device preparation. Both continuous wave and transient electroluminescence (EL) were studied. A new efficient and intense UV-violet light emitting device was developed. At a current density of 10 mA/cm{sup 2}, the optimal radiance R could reach 0.38 mW/cm{sup 2}, and the quantum efficiency was 1.25%. using the delayed EL technique, electron mobilities in DPVBi and CBP were determined to be {approx} 10{sup -5} cm{sup 2}/Vs and {approx} 10{sup -4} cm{sup 2}/Vs, respectively. Overshoot effects in the transient El of blue light emitting devices were also observed and studied. This effect was attributed to the charge accumulation at the organic/organic and organic/cathode interfaces.

Lijuan Zou

2003-08-05T23:59:59.000Z

215

Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Cleanup Agreement Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and that appropriate response actions are taken. * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the site. * Coordinate all of DOE's cleanup obligations under CERCLA, RCRA, and the Colorado

216

Preliminary Notice of Violation , Rocky Flats Environmental Technology Site  

Broader source: Energy.gov (indexed) [DOE]

Violation , Rocky Flats Environmental Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary Notice of Violation issued to Safe Sites of Colorado related to Radiological and Work Control Deficiencies associated with Two Radiological Release Events at the Rocky Flats Environmental Technology Site, (EA-96-05) Based on our evaluation of these matters, DOE has concluded that violations of DOE's Occupational Radiation Protection Rule (10 CFR 835) and Quality Assurance Rule (10 CFR 830.120) likely occurred. An enforcement conference was held with you, as well as senior management of KHLL and Rocky Mountain Remediation Services (RMRS), on September 10, 1996. This conference included a discussion of the facts and circumstances surrounding these

217

Rocky Flats Former Construction Workers, Construction Worker Screening  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

218

Gabbs Alkali Flat Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Gabbs Alkali Flat Geothermal Area Gabbs Alkali Flat Geothermal Area (Redirected from Gabbs Alkali Flat Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Gabbs Alkali Flat Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0

219

Microsoft Word - RockyFlatsCRO20030221.doc  

Broader source: Energy.gov (indexed) [DOE]

300,000 Block Grant to the 300,000 Block Grant to the Rocky Flats Community Reuse Organization Money Will Be Used To Develop Comprehensive Refuge Plan for Rocky Flats WASHINGTON, DC - The Department of Energy (DOE) today announced that it will award $300,000 to the Rocky Flats Coalition of Local Governments. A CRO is an organization recognized by the Energy Department that can apply for funding for programs that can modify the impacts of workforce restructuring at its facilities and reduce community dependence on the department's activities. This grant will enable the community reuse organization (CRO) to continue to play a critical role in working with the Energy Department on the development of a comprehensive refuge plan for Rocky Flats, review cleanup and closure documents to ensure that they meet long-term

220

Final Transuranic Waste Shipment Leaves Rocky Flats | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats Final Transuranic Waste Shipment Leaves Rocky Flats April 19, 2005 - 12:23pm Addthis Cleanup Ahead of Schedule, On Track to Save Taxpayers Billions GOLDEN, CO. - A major environmental victory was achieved at the Rocky Flats Site in Golden, Colo., today when the final remaining shipment of radioactive, transuranic (TRU) waste left the property on a truck bound for an underground waste repository in New Mexico. This major milestone is another step toward the final conversion of the site to a National Wildlife Refuge managed by the U.S. Fish and Wildlife Service. "This is great news for all of Colorado, and would not have been possible without hand-in-glove cooperation between the Department of Energy, the

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE's Former Rocky Flats Weapons Production Site to Become National...  

Energy Savers [EERE]

Flats nuclear weapons production site to the Department of the Interior's (DOI) U.S. Fish and Wildlife Service (FWS) for use as a National Wildlife Refuge. After more than a...

222

The Redshift Distribution of Flat-Spectrum Radio Sources  

E-Print Network [OSTI]

The redshift distribution of flat-spectrum radio sources with 5 GHz flux densities S>5 mJy is a key component in using current radio lens surveys to probe the cosmological model. We have constructed the first flat-spectrum radio sample in the flux density range 3-20 mJy. Our new sample has 33 sources; we have determined the redshifts of 14 of these (42% complete). The low mean redshift, ~0.75, of our faintest sample needs to be confirmed by further observations to improve the sample completeness. We also increased the redshift completeness of several surveys of brighter flat-spectrum sources. While the mean redshift, ~1.1 of flat-spectrum samples fainter than 1 Jy is nearly constant, the fraction of the sources identifiable as quasars steadily drops from ~80% to ~10% as the flux density of the sources decreases.

J. A. Munoz; E. E. Falco; C. S. Kochanek; J. Lehar; E. Mediavilla

2003-05-20T23:59:59.000Z

223

On the performance of the flat plate solar heat collector  

Science Journals Connector (OSTI)

A flat plate heat collector was constructed for the purpose of heating water by solar energy. It was erected facing south, tilted to the horizontal at the optimum tilt angle, and tested ... was found, for the dim...

M. K. Elnesr; A. M. Khalil

1965-01-01T23:59:59.000Z

224

Composition and method for encapsulating photovoltaic devices  

DOE Patents [OSTI]

A composition and method for encapsulating a photovoltaic device which minimizes discoloration of the encapsulant. The composition includes an ethylene-vinyl acetate encapsulant, a curing agent, an optional ultraviolet light stabilizer, and/or an optional antioxidant. The curing agent is preferably 1,1-di-(t-butylperoxy)-3,3,5-trimethylcyclohexane; the ultraviolet light stabilizer is bis-(N-octyloxy-tetramethyl) piperidinyl sebacate and the antioxidant is selected from the group consisting of tris (2,4-di-tert-butylphenyl) phosphite, tetrakis methylene (3,5-di-tert-butyl-4-hydroxyhydrocinnamate) methane, octadecyl 3,5-di-tert-butyl-4-hydroxyhydrocinnamate, and 2,2'-ethylidene bis(4,6-di-t-butylphenyl) fluorophosponite. The composition is applied to a solar cell then cured. The cured product contains a minimal concentration of curing-generated chromophores and resists UV-induced degradation.

Pern, Fu-Jann (Golden, CO)

2000-01-01T23:59:59.000Z

225

Benchmarking and performance improvement at Rocky Flats Technology Site  

SciTech Connect (OSTI)

The Rocky Flats Environmental Technology Site has initiated a major work process improvement campaign using the tools of formalized benchmarking and streamlining. This paper provides insights into some of the process improvement activities performed at Rocky Flats from November 1995 through December 1996. It reviews the background, motivation, methodology, results, and lessons learned from this ongoing effort. The paper also presents important gains realized through process analysis and improvement including significant cost savings, productivity improvements, and an enhanced understanding of site work processes.

Elliott, C. [Kaiser-Hill Co., (United States); Doyle, G. [EG and G Rocky Flats, Inc., Golden, CO (United States); Featherman, W.L. [Project Performance Corp. (United States)

1997-03-01T23:59:59.000Z

226

AGREEMENT FOR MOBILE TECHNOLOGY ACCESS AND My signature on the "Mobile Technology Access and Payment Option Request"  

E-Print Network [OSTI]

AGREEMENT FOR MOBILE TECHNOLOGY ACCESS AND ALLOWANCE My signature on the "Mobile Technology Access and conditions identified in the Access to Mobile Technology and the Payment Options for Mobile Technology policies [http://hr.uoregon.edu/policy/MobileTechnologyDevice.html]. 2. I understand that that I must

Oregon, University of

227

Bipolar thermoelectric devices  

E-Print Network [OSTI]

The work presented here is a theoretical and experimental study of heat production and transport in bipolar electrical devices, with detailed treatment of thermoelectric effects. Both homojunction and heterojunction devices ...

Pipe, Kevin P. (Kevin Patrick), 1976-

2004-01-01T23:59:59.000Z

228

Pulse flux measuring device  

DOE Patents [OSTI]

A device for measuring particle flux comprises first and second photodiode detectors for receiving flux from a source and first and second outputs for producing first and second signals representing the flux incident to the detectors. The device is capable of reducing the first output signal by a portion of the second output signal, thereby enhancing the accuracy of the device. Devices in accordance with the invention may measure distinct components of flux from a single source or fluxes from several sources.

Riggan, William C. (Albuquerque, NM)

1985-01-01T23:59:59.000Z

229

Pulse detecting device  

DOE Patents [OSTI]

A device for measuring particle flux comprises first and second photodiode detectors for receiving flux from a source and first and second outputs for producing first and second signals representing the flux incident to the detectors. The device is capable of reducing the first output signal by a portion of the second output signal, thereby enhancing the accuracy of the device. Devices in accordance with the invention may measure distinct components of flux from a single source or fluxes from several sources.

Riggan, W.C.

1984-01-01T23:59:59.000Z

230

Wireless Network Capacity Management: A Real Options Approach  

E-Print Network [OSTI]

capacity, market price of risk, investment timing option 1 Introduction Wireless networks are now regarded

Forsyth, Peter A.

231

Hydrogen Production: Overview of Technology Options, January 2009  

Fuel Cell Technologies Publication and Product Library (EERE)

Overview of technology options for hydrogen production, its challenges and research needs and next steps

232

Green Building Policy Options for New Orleans  

Broader source: Energy.gov (indexed) [DOE]

Green Building Policy Options Green Building Policy Options for New Orleans Elizabeth Doris Technical Report NREL/TP-7A30-52576 September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Green Building Policy Options for New Orleans Elizabeth Doris Prepared under Task No(s). IDNO.1030 Technical Report NREL/TP-7A30-52576 September 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

233

Disposition options for {sup 233}U  

SciTech Connect (OSTI)

The United States is implementing a program to dispose of excess nuclear-weapons-usable materials--including {sup 233}U. A series of studies have identified multiple {sup 233}U disposition options, and these options are described herein. Most of the options involve adding depleted uranium containing {sup 238}U to the {sup 233}U. Converting the {sup 233}U into a mixture of <12 wt % {sup 233}U in {sup 238}U converts the weapons-usable {sup 233}U into nonweapons-usable {sup 233}U. For {sup 233}U that is considered waste, further isotopic dilution to <0.66 wt % {sup 233}U in {sup 238}U minimizes potential long-term repository criticality concerns and in many cases minimizes final waste volumes.

Forsberg, C.W.; Icenhour, A.S.; Krichinsky, A.M.

1998-04-27T23:59:59.000Z

234

Articulating feedstock delivery device  

DOE Patents [OSTI]

A fully articulable feedstock delivery device that is designed to operate at pressure and temperature extremes. The device incorporates an articulating ball assembly which allows for more accurate delivery of the feedstock to a target location. The device is suitable for a variety of applications including, but not limited to, delivery of feedstock to a high-pressure reaction chamber or process zone.

Jordan, Kevin

2013-11-05T23:59:59.000Z

235

Organic photosensitive devices  

DOE Patents [OSTI]

The present invention generally relates to organic photosensitive optoelectronic devices. More specifically, it is directed to organic photosensitive optoelectronic devices having a photoactive organic region containing encapsulated nanoparticles that exhibit plasmon resonances. An enhancement of the incident optical field is achieved via surface plasmon polariton resonances. This enhancement increases the absorption of incident light, leading to a more efficient device.

Rand, Barry P; Forrest, Stephen R

2013-11-26T23:59:59.000Z

236

EIS-0123: Direct Service Industry Options  

Broader source: Energy.gov [DOE]

BPA proposes to implement one or more options to reduce load fluctuations and revenue uncertainty resulting from its electrical service to 10 aluminum smelters and its other direct service industrial customers. BPA believes these options will give BPA greater ability to plan for power needs and help to maintain its relatively strong financial position during the current period of power surplus. They also are expected to enhance BPA's ability to repay the U.S. Treasury. In turn, BPA rates to other customers would stabilize.

237

Method of making organic light emitting devices  

DOE Patents [OSTI]

The present invention provides a method for the preparation of organic light-emitting devices comprising a bilayer structure made by forming a first film layer comprising an electroactive material and an INP precursor material, and exposing the first film layer to a radiation source under an inert atmosphere to generate an interpenetrating network polymer composition comprising the electroactive material. At least one additional layer is disposed on the reacted first film layer to complete the bilayer structure. The bilayer structure is comprised within an organic light-emitting device comprising standard features such as electrodes and optionally one or more additional layers serving as a bipolar emission layer, a hole injection layer, an electron injection layer, an electron transport layer, a hole transport layer, exciton-hole transporting layer, exciton-electron transporting layer, a hole transporting emission layer, or an electron transporting emission layer.

Shiang, Joseph John (Niskayuna, NY); Janora, Kevin Henry (Schenectady, NY); Parthasarathy, Gautam (Saratoga Springs, NY); Cella, James Anthony (Clifton Park, NY); Chichak, Kelly Scott (Clifton Park, NY)

2011-03-22T23:59:59.000Z

238

Effect of helium addition on discharge characteristics in a flat fluorescent lamp  

SciTech Connect (OSTI)

The discharge characteristics of a multielectrode dual coplanar in a mercury-free flat fluorescent lamp were investigated using brightness-efficiency measurement and the infrared (IR) spectrum and intensified charge coupled device (ICCD) characteristics. The level of brightness was above 14 900 cd/m{sup 2} under the conditions of neon--50% xenon-8% He gas composition, 150 Torr pressure, and 20 kHz alternating current pulse. The ICCD results revealed a faster and wider discharge with a Ne-50% Xe-8% He gas composition. The effect of adding helium (He) to Ne-50% Xe revealed a faster peak emission, as confirmed by ICCD images. From the gated IR emission spectrum, the intensity ratio of I{sub 823nm}/I{sub 828nm} was {approx}8% higher with Ne-50% Xe-8% He than with Ne-50% Xe under the same pressure and applied voltage conditions.

Lee, Seong-Eui; Lee, Ho-Nyeon; Park, Hyoung-Bin; Lee, Kyo Sung; Choi, Kyung Cheol [Materials and Devices Research Center, Samsung Advanced Institute of Technology, Suwon 440-600 (Korea, Republic of); Department of Electronics Engineering, Sejong University, Seoul 143-747 (Korea, Republic of); Department of Electrical Engineering and Computer Science, Korea Advanced Institute of Science and Technology (KAIST), Daejeon 305-701 (Korea, Republic of)

2005-11-01T23:59:59.000Z

239

Integrating Volume Reduction and Packaging Alternatives to Achieve Cost Savings for Low Level Waste Disposal at the Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

In order to reduce costs and achieve schedules for Closure of the Rocky Flats Environmental Technology Site (RFETS), the Waste Requirements Group has implemented a number of cost saving initiatives aimed at integrating waste volume reduction with the selection of compliant waste packaging methods for the disposal of RFETS low level radioactive waste (LLW). Waste Guidance Inventory and Shipping Forecasts indicate that over 200,000 m3 of low level waste will be shipped offsite between FY2002 and FY2006. Current projections indicate that the majority of this waste will be shipped offsite in an estimated 40,000 55-gallon drums, 10,000 metal and plywood boxes, and 5000 cargo containers. Currently, the projected cost for packaging, shipment, and disposal adds up to $80 million. With these waste volume and cost projections, the need for more efficient and cost effective packaging and transportation options were apparent in order to reduce costs and achieve future Site packaging a nd transportation needs. This paper presents some of the cost saving initiatives being implemented for waste packaging at the Rocky Flats Environmental Technology Site (the Site). There are many options for either volume reduction or alternative packaging. Each building and/or project may indicate different preferences and/or combinations of options.

Church, A.; Gordon, J.; Montrose, J. K.

2002-02-26T23:59:59.000Z

240

A Generic Assessment of Response Options  

E-Print Network [OSTI]

.4 Mitigation Options 236 704.1 Energy conservation and efficiency 7.7 Regional Differences and International improvement 236 Cooperation 254 7.4.2 Fossil fuel switching 240 7.4.3 Renewable energy technologies 241, including · Energy conservation and efficiency improvement · Fossil fuel switching · Renewable energy

Delaware, University of

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Page 1 of 16 RIGHTS AND OPTIONS  

E-Print Network [OSTI]

the campus Title IX Coordinator who can provide you with information on your options, rights and remedies with that process, including the investigation process; how confidentiality is handled; available resources, both of complaint, investigation, and discipline procedures; provide consultation to executive/senior level

242

RTGs Options for Pluto Fast Flyby Mission  

SciTech Connect (OSTI)

A small spacecraft design for the Pluto Fast Flyby (PFF) Mission is under study by the Jet Propulsion Laboratory (JPL) for the National Aeronautics and Space Administration (NASA), for a possible launch as early as 1998. JPL's 1992 baseline design calls for a power source able to furnish an energy output of 3963 kWh and a power output of 69 watts(e) at the end of the 9.2-year mission. Satisfying those demands is made difficult because NASA management has set a goal of reducing the spacecraft mass from a baseline value of 166 kg to ~110 kg, which implies a mass goal of less than 10 kg for the power source. To support the ongoing NASA/JPL studies, the Department of Energy's Office of Special Applications (DOE/OSA) commissioned Fairchild Space to prepare and analyze conceptual designs of radioisotope power systems for the PFF mission. Thus far, a total of eight options employing essentially the same radioisotope heat source modules were designed and subjected to thermal, electrical, structural, and mass analyses by Fairchild. Five of these - employing thermoelectric converters - are described in the present paper, and three - employing free-piston Stirling converters - are described in the companion paper presented next. The system masses of the thermoelectric options ranged from 19.3 kg to 10.2 kg. In general, the options requiring least development are the heaviest, and the lighter options require more development with greater programmatic risk. There are four duplicate copies

Schock, Alfred

1993-10-01T23:59:59.000Z

243

Hedging Milk with BFP Futures and Options  

E-Print Network [OSTI]

Hedging Milk with BFP Futures and Options David Anderson, Dean McCorkle, Robert B. Schwart, Jr. and Rodney Jones* The 1996 farm bill changed the dairy industry forever. The security provided by the support program is gone and the Federal Order...

Anderson, David P.; McCorkle, Dean; Schwart Jr., Robert B.; Jones, Rodney

1999-06-23T23:59:59.000Z

244

Advanced ignition options for laser ICF  

E-Print Network [OSTI]

Advanced ignition options for laser ICF FPA Meeting, Washington DC, December 1-3, 2010 R. Betti shock) · Fast Ignition requires major hardware upgrades: 100kJ-class multi-PW laser [also talk by P explore high-gain shock ignition - Polar Shock Ignition (uses half the NIF beams to drive the implosion

245

Rocky Flats Site Expands Solar Power for Treating Groundwater | Department  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater April 17, 2013 - 1:26pm Addthis Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. DOE was able to minimize impacts to the habitat of a federally protected mouse and provide the potential for relatively easy relocation by mounting the solar panels on the side of the conex box that houses the batteries and other system equipment.

246

Flat-Plate Photovoltaic Module Basics | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Module Basics Module Basics Flat-Plate Photovoltaic Module Basics August 20, 2013 - 4:25pm Addthis Flat-plate photovoltaic (PV) modules are made of several components, including the front surface materials, encapsulant, rear surface, and frame. Front Surface Materials The front surface of a flat-plate PV module must have a high transmission in the wavelengths that can be used by the solar cells in the module. For example, for silicon solar cells, the top surface must have high transmission of light with wavelengths from 350 to 1200 nm. Also, reflection from the front surface should be minimal. An antireflection coating added to the top surface can greatly reduce the reflection of sunlight, and texturing of the surface can cause light that strikes the surface to stay within the cells. Unfortunately, these textured

247

Flat plate solar collector with a cantilevered mirror  

SciTech Connect (OSTI)

The use of flat booster mirrors with flat plate collectors provides moderate solar flux concentration and enhanced performance especially when the mirrors are seasonally adjusted. Curved mirrors provide higher flux concentration and a practical system has been developed where the booster mirror is bent elastically. The system employs a single cantilever mirror which is located below a conventional flat plate collector. The mirror is clamped at the base of the collector panel and its free end is deflected upward; a smaller deflection is used in the fall and winter than in the spring and summer. The prototype system consists of a 0.9 by 2.5 m collector panel mounted on its side (horizontal fluid flow) and a 2.7 by 2.5 m elastic mirror. The mirror is made with aluminum sheet with an adherent aluminized acrylic film. The system has been designed for mounting on horizontal surfaces at latitudes of 10 to 50/sup 0/.

Cohen, S.; Larson, D.C.

1981-01-01T23:59:59.000Z

248

Rocky Flats Plant Site Environmental Report, January--December 1990  

SciTech Connect (OSTI)

This report provides information to the public about the impact of the Rocky Flats Plant on the environment and public health. The report contains a compliance summary, a description of environmental monitoring programs, and radiation dose estimates for the surrounding population for the period January 1 through December 31, 1990. An environmental surveillance program has been ongoing at the Rocky Flats Plant since the 1950s. Early programs focused on radiological impacts to the environment. The current program examines potential impacts to air, surface water, groundwater, and soils from radiological and nonradiological sources. Environmental operations at Rocky Flats Plant are under the jurisdiction of several local, state, and federal agencies, most notably the Colorado Department of Health, Environmental Protection Agency, and Department of Energy. A variety of reports are prepared at different intervals for these and other agencies in addition to the annual environmental report.

Cirrincione, D.A.; Costain, D.B. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant

1990-12-31T23:59:59.000Z

249

Rocky Flats Site Expands Solar Power for Treating Groundwater | Department  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater Rocky Flats Site Expands Solar Power for Treating Groundwater April 17, 2013 - 1:26pm Addthis Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. Subcontractor personnel install solar panels and other infrastructure on a 40-foot conex box that houses the batteries and control equipment for the 6 kilowatt photovoltaic system that powers the ETPTS groundwater treatment system. DOE was able to minimize impacts to the habitat of a federally protected mouse and provide the potential for relatively easy relocation by mounting the solar panels on the side of the conex box that houses the batteries and other system equipment.

250

Gabbs Alkali Flat Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Gabbs Alkali Flat Geothermal Area Gabbs Alkali Flat Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Gabbs Alkali Flat Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

251

Fast Spectrum Molten Salt Reactor Options  

SciTech Connect (OSTI)

During 2010, fast-spectrum molten-salt reactors (FS-MSRs) were selected as a transformational reactor concept for light-water reactor (LWR)-derived heavy actinide disposition by the Department of Energy-Nuclear Energy Advanced Reactor Concepts (ARC) program and were the subject of a preliminary scoping investigation. Much of the reactor description information presented in this report derives from the preliminary studies performed for the ARC project. This report, however, has a somewhat broader scope-providing a conceptual overview of the characteristics and design options for FS-MSRs. It does not present in-depth evaluation of any FS-MSR particular characteristic, but instead provides an overview of all of the major reactor system technologies and characteristics, including the technology developments since the end of major molten salt reactor (MSR) development efforts in the 1970s. This report first presents a historical overview of the FS-MSR technology and describes the innovative characteristics of an FS-MSR. Next, it provides an overview of possible reactor configurations. The following design features/options and performance considerations are described including: (1) reactor salt options-both chloride and fluoride salts; (2) the impact of changing the carrier salt and actinide concentration on conversion ratio; (3) the conversion ratio; (4) an overview of the fuel salt chemical processing; (5) potential power cycles and hydrogen production options; and (6) overview of the performance characteristics of FS-MSRs, including general comparative metrics with LWRs. The conceptual-level evaluation includes resource sustainability, proliferation resistance, economics, and safety. The report concludes with a description of the work necessary to begin more detailed evaluation of FS-MSRs as a realistic reactor and fuel cycle option.

Gehin, Jess C [ORNL; Holcomb, David Eugene [ORNL; Flanagan, George F [ORNL; Patton, Bruce W [ORNL; Howard, Rob L [ORNL; Harrison, Thomas J [ORNL

2011-07-01T23:59:59.000Z

252

NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT  

SciTech Connect (OSTI)

The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

2010-10-19T23:59:59.000Z

253

Mobile Device Guide Apple iPhone Devices  

E-Print Network [OSTI]

Mobile Device Guide ­ Apple iPhone Devices CSUF Date Last Revised: 1/20/11 Page 1 of 3 ConnectingPhone desktop. 1a. Expand `Mail, Contacts, Calendars' as shown. #12;Mobile Device Guide ­ Apple iPhone Devices (case sensitive). 4. Tap `next'. #12;Mobile Device Guide ­ Apple iPhone Devices CSUF Date Last Revised

de Lijser, Peter

254

Flat Glass Manufacturing Plant EPI | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Flat Glass Manufacturing Plant EPI Flat Glass Manufacturing Plant EPI Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

255

Wave interaction with a fixed vertical flat plate  

E-Print Network [OSTI]

. Hydrofoil definition sketch. The sharp-edged gust problem and the problem of a step-wise cnange in the velocity perpendicular to the foil offers insight into the response of a foil subject to an oscillating fluid. A sharp-edged gust with an initial... forces on a thin flat plate with a standard hydrofoil thickness was determined experimentally in a two-dimensional wave tank. Non-dimensional parameters were plotted and used to evaluate the data. It was shown that lift can be generated on a flat...

Glover, Lanny Bruce

1985-01-01T23:59:59.000Z

256

Increase in uranium concentration in streams draining Rocky Flats, Colorado  

Science Journals Connector (OSTI)

Uranium has been determined by fission track measurements of two suites of water samples taken at different times from a variety of surface waters in an area in central Colorado. Although this area surrounds the Rocky Flats nuclear plant at which parts for weapons are fabricated, the variations in U are inferred to be influenced most strongly by the distance of water flow across soil derived from the U-rich Laramie Formation. This flow produces progressive increases in U concentrations as flow proceeds eastward and hence is much more closely related to the local geochemistry and geology than to the presence of the Rocky Flats plant.

A.C. Delany; R.L. Fleischer

1978-01-01T23:59:59.000Z

257

Rocky Flats Plant site environmental report, January--December 1991  

SciTech Connect (OSTI)

This report provides information to the public about the impact of the Rocky Flats Plant on the environment and public health. The report contains a compliance summary, 4 description of environmental monitoring programs, and radiation dose estimates for the surrounding population for the period January 1 through December 31, 1991. An environmental surveillance program has been ongoing at the Rocky Flats Plant since the 1950s. Early programs focused on radiological impacts to the environment. The current program not only examines potential impacts to air surface water, groundwater, and soils from radiological and nonradiological sources, but also includes ecological studies and environmental remediation programs.

Cirrncione, D.A.; Erdmann, N.L. [eds.

1991-12-31T23:59:59.000Z

258

Barrier breaching device  

DOE Patents [OSTI]

A barrier breaching device that is designed primarily for opening holes in interior walls of buildings uses detonating fuse for explosive force. The fuse acts as the ribs or spokes of an umbrella-like device that may be opened up to form a cone. The cone is placed against the wall so that detonating fuse that rings the base of the device and which is ignited by the spoke-like fuses serves to cut a circular hole in the wall.

Honodel, Charles A. (Tracy, CA)

1985-01-01T23:59:59.000Z

259

Barrier breaching device  

DOE Patents [OSTI]

A barrier breaching device that is designed primarily for opening holes in interior walls of buildings uses detonating fuse for explosive force. The fuse acts as the ribs or spokes of an umbrella-like device that may be opened up to form a cone. The cone is placed against the wall so that detonating fuse that rings the base of the device and which is ignited by the spoke-like fuses serves to cut a circular hole in the wall.

Honodel, C.A.

1983-06-01T23:59:59.000Z

260

Active Terahertz Metamaterial Devices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Active Terahertz Metamaterial Devices Active Terahertz Metamaterial Devices Active Terahertz Metamaterial Devices Metamaterial structures are taught which provide for the modulation of terahertz frequency signals. Available for thumbnail of Feynman Center (505) 665-9090 Email Active Terahertz Metamaterial Devices Metamaterial structures are taught which provide for the modulation of terahertz frequency signals. Each element within an array of metamaterial (MM) elements comprises multiple loops and at least one gap. The MM elements may comprise resonators with conductive loops and insulated gaps, or the inverse in which insulated loops are present with conductive gaps; each providing useful transmissive control properties. The metamaterial elements are fabricated on a semiconducting substrate configured with a

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Composite Thermoelectric Devices  

Broader source: Energy.gov [DOE]

Composite thermoelectric devices incorporating common conductors laminated between P- and N-type thermoelectric plates demonstrate internal ohmic loss reduction and enhanced performance

262

Inertial separator as a sediment control device  

SciTech Connect (OSTI)

The focus of this research was to address the feasibility of employing an inertial separator as a sediment control device on surface mined lands. A mathematical model has been developed to predict the sediment capture efficiency of this device on a particle size basis, and under alternative design construction conditions. The predicted performance of the inertial separator has been analyzed for a 10 year-24 hour storm generated from a contour mining operation in the Appalachian coal region. The inertial separator is designed to replace a sediment basin as the primary sediment control device. It is designed to be transported on one flat bed truck and could be modularized to facilitate a rapid installation. It has the advantages of relocation and reuse from one site to another, no moving parts, no energy requirements, simple construction, etc. The inertial separator is designed to reduce the problems common to sedimentation processes. The system uses the inertia of settling particles in accelerating flow to enhance separation, reduce short circuiting, and increase particle detention time (with a resultant increase in flocculation potential). A detailed design example is presented to indicate the expected sediment trap efficiency of the inertial separator for a sediment generated from a typical mining operation. Sediment and hydrologic inputs were determined using the SEDIMOT II model. Also, preliminary construction specifications are detailed.

Sterling, H.J.; Warner, R.C.

1984-12-01T23:59:59.000Z

263

Windy Flats(3Q09 portion) | Open Energy Information  

Open Energy Info (EERE)

Windy Flats(3Q09 portion) Windy Flats(3Q09 portion) Jump to: navigation, search Name Windy Flats(3Q09 portion) Facility Windy Flats(3Q09 portion) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Cannon Power Group Developer Cannon Power Group Location North shore of Columbia River Coordinates 45.699622°, -120.774622° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.699622,"lon":-120.774622,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

264

Differentially Flat Trajectory Generation for a Dynamically Stable Mobile Robot  

E-Print Network [OSTI]

for the ballbot, a dynamically stable mobile robot which balances on a single spherical wheel. To this end, assumptions are made to form the system as differentially flat, and a method of deriving feasible trajectories, dynamically stable mobile robot. It is a human-sized robot that balances on a single spherical wheel

265

Science in a Flat World (George B. Pegram Lecture Series)  

SciTech Connect (OSTI)

Lane discusses the changes that have taken place in the world since World War II that have made it "flatter," referring to Thomas L. Friedman's book, The World is Flat. Friedman's main premise is that inexpensive telecommunications is bringing about unhampered international competition, the demise of economic stability, and a trend toward outsourcing services, such as computer programming, engineering and science research.

Lane, Neal (former Science Advisor to President Billl Clinton) [former Science Advisor to President Billl Clinton

2006-09-12T23:59:59.000Z

266

Rocky Flats Cleanup Agreement implementation successes and challenges  

SciTech Connect (OSTI)

On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

Shelton, D.C.

1997-02-01T23:59:59.000Z

267

No Open or Flat Bouncing Cosmologies in Einstein Gravity  

E-Print Network [OSTI]

We show that bouncing open or flat Friedmann-Robertson-Walker cosmologies are inconsistent with worldsheet string theory to first approximation. Specifically, the Virasoro constraint translates to the null energy condition in spacetime at leading order in the alpha-prime expansion. Thus one must go beyond minimally-coupled Einstein gravity in order to find bounce solutions.

Parikh, Maulik K

2015-01-01T23:59:59.000Z

268

Remediation of the Maxey Flats Site. Final report  

SciTech Connect (OSTI)

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

269

Characterization of plutonium in Maxey Flats radioactive trench leachates  

SciTech Connect (OSTI)

Plutonium in trench leachates at the Maxey Flats radioactive waste disposal site exists as dissolved species, primarily complexes of the tetravalent ion with strong organic ligands such as ethylenediaminetetraacetic acid. The complexes are not sorbed well by sediment and are only partly precipitated by ferric hydroxide. These results indicate the importance of isolating radioactive waste from organic matter. 3 tables.

Cleveland, J.M.; Rees, T.F.

1981-06-26T23:59:59.000Z

270

Geochemistry of trench leachates from Maxey Flats disposal site  

SciTech Connect (OSTI)

The results of the analysis of trench leachates collected at Maxey Flats in October 1981 are presented, and the geochemical factors controlling the trench water chemistry are discussed. In addition, results of laboratory oxidation experiments performed on trench leachates, simulating the behavior of anoxic trench waters as they encounter upon migration an oxidizing environment, are presented.

Dayal, R.; Pietrzak, R.F.; Clinton, J.; Kinsley, M.

1983-01-01T23:59:59.000Z

271

Hydrogeologic characterization report for the Rocky Flats environmental technology site  

SciTech Connect (OSTI)

The Denver groundwater basin encompasses approximately 6,700 square miles, extending east from the Front Range of the Rocky Mountains. This structural basin contains four Cretaceous bedrock aquifers overlain by a regional Quaternary alluvial aquifer. The Rocky Flats Site is located on the northwest margin of the basin. The shallow groundwater system at the Rocky Flats Site is divided into upper and lower hydrostratigraphic units (UHSU and LHSU, respectively). The UHSU at the Rocky Flats site comprises Quaternary alluvium, colluvium, valley-fill alluvium, artificial fill, weathered bedrock of the undifferentiated Arapahoe and Laramie formations and all sandstones that are hydraulically connected with overlying surficial groundwater. The LHSU comprises unweathered claystone with interbedded siltstones and sandstones of the undifferentiated Arapahoe and Laramie formations. The contact separating the UHSU and LHSU is identified as the base of the weathered zone. The separation of hydrostratigraphic units is supported by the contrasting permeabilities of the units comprising the UHSU and LHSU, well hydrograph data indicating that the units respond differently to seasonal recharge events, and geochemical data reflecting distinct major ion chemistries in the groundwaters of the UHSU and LHSU. Surface-water/groundwater interactions at the Rocky Flats site generally respond to seasonal fluctuations in precipitation, recharge, groundwater storage, and stream and ditch flow. Effluent conditions are dominant in the spring along western stream segments and influent conditions are common in the late summer and fall along most stream reaches.

Reeder, D.C.; Burcar, S. [S.M. Stoller Corp., Boulder, CO (United States); Smith, R. [RMRS, Golden, CO (United States)] [and others

1996-12-31T23:59:59.000Z

272

Site wide integration of the Rocky Flats closure project  

SciTech Connect (OSTI)

The prime contractor for the Rocky Flats Closure Project (RFCP), Kaiser-Hill, in concert with the Department of Energy--Rocky Flats Field Office (DOE-RFFO) has applied a fully integrated, life-cycle, critical path schedule and work planning system to manage the work that is required to close the Site. The closure of the Site is complex, in that it houses over 700 facilities, 19,600 kilograms of Special Nuclear Material (Plutonium and Uranium), and over 160,000 cubic meters of Transuranic, Low Level, and Hazardous Waste. The deactivation, decommissioning, decontaminating, and demolition of this large number of facilities, while at the same time accommodating difficult on-going activities, significantly increases the sophistication required in the planning process. The Rocky Flats team has overcome these difficulties by establishing a money oriented critical path process, to provide a least-cost avenue to supporting on-going activities and a line-of-balance process for production oriented activities. These processes, when integrated with a typical activity-based project planning system, guide the way to the shortest and most cost-effective course for the closure of the Rocky Flats Site.

Burdge, L.F.; Golan, P.

1998-06-01T23:59:59.000Z

273

TGS measurements of pyrochemical salts at Rocky Flats  

SciTech Connect (OSTI)

A new skid-mounted tomographic gamma scanner (TGS) was designed to assist in the decommissioning of Rocky Flats Building 37 1, This instrument was used to assay pyrochemical salts as a prerequisite for disposal at the Waste Isolation Pilot Plant (WIPP). The following paper discusses measurement challenges and results from the first year of operation of the instrument.

Mercer, D. J. (David J.); Hansen, J. S. (J. Steven); Lestone, J. P. (John P.); Prettyman, T. H. (Thomas H.)

2001-01-01T23:59:59.000Z

274

Adsorption study for uranium in Rocky Flats groundwater  

SciTech Connect (OSTI)

Six adsorbents were studied to determine their effectiveness in removing uranium in Rocky Flats groundwater. The bench column and batch (Kd) tests showed that uranium can be removed (>99.9%) by four adsorbents. Bone Charcoal (R1O22); F-1 Alumina (granular activated alumina); BIOFIX (immobilized biological agent); SOPBPLUS (mixed metal oxide); Filtrasorb 300 (granular activated carbon); and Zeolite (clinoptilolite).

Laul, J.C.; Rupert, M.C. [EG and G Rocky Flats, Inc., Golden, CO (United States); Harris, M.J. [Science Applications International Corp., Golden, CO (United States); Duran, A. [Environmental Protection Agency, Denver, CO (United States)

1995-01-01T23:59:59.000Z

275

Interacting generalized Chaplygin gas model in non-flat universe  

E-Print Network [OSTI]

We employ the generalized Chaplygin gas of interacting dark energy to obtain the equation of state for the generalized Chaplygin gas energy density in non-flat universe. By choosing a negative value for $B$ we see that $w_{\\rm \\Lambda}^{eff}< -1$, that corresponds to a universe dominated by phantom dark energy.

M R Setare

2007-11-04T23:59:59.000Z

276

Final Report - Hydrogen Delivery Infrastructure Options Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Power of Experience The Power of Experience Final Report Hydrogen Delivery Infrastructure Options Analysis DOE Award Number: DE-FG36-05GO15032 Project director/principal investigator: Tan-Ping Chen Consortium/teaming Partners: Air Liquide, Chevron Technology Venture, Gas Technology Institute, NREL, Tiax, ANL Hydrogen Delivery Infrastructure Options Analysis ii TABLE OF CONTENTS SECTION 1 EXECUTIVE SUMMARY ........................................................................... 1-1 1.1 HOW THE RESEARCH ADDS TO THE UNDERSTANDING OF THE AREA INVESTIGATED. 1-1 1.2 TECHNICAL EFFECTIVENESS AND ECONOMIC FEASIBILITY OF THE METHODS OR TECHNIQUES INVESTIGATED OR DEMONSTRATED .................................................... 1-1 1.3 HOW THE PROJECT IS OF BENEFIT TO THE PUBLIC..................................................... 1-1

277

Energy management options for high speed trains  

SciTech Connect (OSTI)

The efficient operation of trains which undergo large changes in energy as they fulfill their operational function requires recapture of the kinetic energy of a high speed train or the potential energy of a train in mountainous terrain. This paper is a description of the various storage options available in the railroad environment and their relative merits. The economic, environmental, and safety issues are discussed. The options discussed include: the physical means of storing energy, the location on board the train or on fixed ground, and the relation of energy storage to the nature of the engine used as a prime mover. It is argued that, in the absence of a fully electric, power supply connected to a utility grid, the gas turbine engine is the best propulsion system to meet the propulsion needs of trains requiring high power and efficiency because its high power to weight ratio enables the use of energy storage.

Decher, R. [Univ. of Washington, Seattle, WA (United States). Dept. of Aeronautics and Astronautics

1995-12-31T23:59:59.000Z

278

Mobile Device Management Android Device Enrollment  

E-Print Network [OSTI]

to manage your device. c. Enter your password. #12;d. Accept the Terms and Conditions e. You have completed. 2. Get Touchdown from Google Play a. Open up the Google Play Store. b. Search for Touchdown. c. Use the application. #12;3. Get Citrix Mobile Connect from Google Play a. Open up the Google Play Store. b. Search

279

MCNP6 Cosmic-Source Option  

SciTech Connect (OSTI)

MCNP is a Monte Carlo radiation transport code that has been under development for over half a century. Over the last decade, the development team of a high-energy offshoot of MCNP, called MCNPX, has implemented several physics and algorithm improvements important for modeling galactic cosmic-ray (GCR) interactions with matter. In this presentation, we discuss the latest of these improvements, a new Cosmic-Source option, that has been implemented in MCNP6.

McKinney, Gregg W [Los Alamos National Laboratory; Armstrong, Hirotatsu [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Clem, John [University of Delaware, BRI; Goldhagen, Paul [DHS, National Urban Security Technology Laboratory

2012-06-19T23:59:59.000Z

280

Understanding Leasing Options for Energy Projects  

E-Print Network [OSTI]

UNDERSTANDING LEASING OPTIONS FOR ENERGY PROJECTS Baker Davenport Davenport Finance Company Richmond, Virginia Industrials often find it difficult to fund energy projects with internal monies. Energy projects must compete with the company...?s ?core? assets for capital dollars. Leasing can be used to overcome some of these hurdles. Topics of discussion will include several key leasing structures, with benefits and disadvantages noted. Project financing is also discussed as a way...

Davenport, B.

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Seattle's system for evaluating energy options  

SciTech Connect (OSTI)

In 1975, the City Council developed a blueprint called Energy 1990 for meeting Seattle's future electric energy needs. Priorities for addressing or offsetting expected growth in demand are in order: (1) conservation (2) hydroelectricity (3) other renewable sources such as wind, biomass, solar, and geothermal energy (4) abundant nonrenewable resources such as coal, and (5) other renewables. An energy resources planning group was formed and a data base was established. Resource options were investigated and the recommendations were published.

Logie, P.; Macdonald, M.J.

1982-01-01T23:59:59.000Z

282

Flat designs of impedance-matched nonmagnetic phase transformer and wave-shaping polarization splitter via transformation optics  

Science Journals Connector (OSTI)

Abstract Based on transformation optics, we propose a method to realize an arbitrary wavefront transformation through an impedance-matched nonmagnetic slab. First, we follow the principle of equal optical path length to realize arbitrary phase transformations by a flat configuration, adopt a nonlinear coordinate transformation to ensure impedance match, and preserve the dispersion relation to render the device nonmagnetic. Applying this method, a phase transformer is designed such that both the wave shape and propagation direction can be changed. Second, we choose distinct deflection angles for two orthogonal polarizations and combine the two sets of material parameters into an anisotropic slab, whereby a wavefront-controllable polarization splitter is achieved. The results are further validated by numerical simulations. The method proposed can be used to develop all-dielectric, lossless and broadband devices that can be easily constructed at optical frequencies.

Weixing Shu; Shuaisai Yang; Wenyan Yan; Yougang Ke; Trevor Smith

2015-01-01T23:59:59.000Z

283

Assessing Renewable Energy Options | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessing Renewable Energy Options Assessing Renewable Energy Options Assessing Renewable Energy Options October 16, 2013 - 5:16pm Addthis Preliminary Screening with an arrow pointing down to Screening. Square with the text planning in the center. A graphic of an arrow pointing down to Feasibility Study. The word Screening appears on the arrow. A square graphic showing the text Programming: Planning Charette and it's aligned to the right of arrow pointing down which reads Screening. An arrow pointing down which reads Feasibility Study. The arrow points to Size and Design Systems. A square graphic with the text Building Design: Schematic Design (35%) shown to the right of an arrow pointing down which reads Feasibility Study. An arrow pointing down which reads Size and Design Systems. This is the last of 4 arrows which show the progression from Preliminary Screening to Screening to Feasibility Study to Size and Design Systems. A square graphic which reads Building Design: Design Development (65%). This is the last of 4 boxes.

284

Power Supply Options for Data Centers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Supply Options for Data Centers Power Supply Options for Data Centers Title Power Supply Options for Data Centers Publication Type Report LBNL Report Number LBNL-63339 Year of Publication 2007 Authors Tschudi, William F., and Charles H. Williams Call Number LBNL-63339 Abstract For many federal facilities, the fastest growing end-use of electric energy is found in concentrations of computing capacity commonly known as data centers. For these users, the critical importance of information processing to their agency mission will present a serious challenge to meeting the aggressive new energy efficiency goals in Executive Order 13423. Federal energy managers can find a variety of methods for reducing energy intensity, in both design and operations, for these high-technology facilities . This report summarizes a recent demonstration of one such technique ? configuring power supply systems for data centers so that they use DC (direct current) power throughout, eliminating the conventional practice of multiple conversions from utility-supplied AC (alternating current) to DC and back again at every stage of the power supply system. This eliminates both the power loss and heat generated by each such conversion (which drives air conditioning energy use).

285

NREL: Financing Geothermal Power Projects - Financing Options for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financing Options for Geothermal Power Projects Financing Options for Geothermal Power Projects Different financing options are used at each stage in geothermal power project development, which include the exploration and drilling stage and construction and operation stage. The financing option in each stage earns a return proportionate with the risk accepted at that stage in the project's development. For each financing option, both financial and non-financial elements should be considered. Financing options and considerations for a typical geothermal power project are shown in the table below. Your project financing options and considerations may be different. Financing Options and Considerations for a Typical Geothermal Power Project* Financial Considerations Financing Stage Exploration and Drilling Construction and Operation

286

Industrial Engineering-BS ,PhD option in Engineering  

E-Print Network [OSTI]

I Industrial Engineering- BS ,PhD option in Engineering Industrial & Management Engineering - BS MS Engineering, Civil Engineering, Electrical 8c Computer Engineering, Environmental Engineering, Industrial Industrial Technoloity - BS option in Technology Education Interdisciplinary Studies - BA; BS J. Japan

Dyer, Bill

287

Analysis of sustainable water supply options for Kuwait  

E-Print Network [OSTI]

This thesis considers several options for improving the sustainability of Kuwait's water supply system. The country currently relies heavily on desalination and brackish groundwater extraction. The options considered for ...

Murtaugh, Katharine A. (Katharine Ann)

2006-01-01T23:59:59.000Z

288

Impacts of project management on real option values  

E-Print Network [OSTI]

reduces the value of real options. The example of resource allocation is used to test this hypothesis. Based on the results, it is concluded that project management reduces the value of real options by reducing variance of the exercise signal...

Bhargav, Shilpa Anandrao

2005-02-17T23:59:59.000Z

289

Security is Not an Option | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

is Not an Option Security is Not an Option A 10-year roadmap for achieving control system cyber security in the energy industry has been hailed as a model for other industries....

290

Self-actuated device  

DOE Patents [OSTI]

A self-actuated device, of particular use as a valve or an orifice for nuclear reactor fuel and blanket assemblies, in which a gas produced by a neutron induced nuclear reaction gradually accumulates as a function of neutron fluence. The gas pressure increase occasioned by such accumulation of gas is used to actuate the device.

Hecht, Samuel L. (Richland, WA)

1984-01-01T23:59:59.000Z

291

ON CAMPUS SUMMER HOUSING OPTIONS SUMMER 2010 CONTRACT  

E-Print Network [OSTI]

Carpenter/Wells Complex-4 Bedroom Flat $627.00 Carpenter/Wells Complex-3 Bedroom Townhouse $652.00 Carpenter/Wells Complex-2 Bedroom Flat $701.00 Carpenter/Wells Complex-1 Bedroom Flat $745.00 Murray Hall $726.00 Rates 56th Street (806) 797-6774 LakeShore at Maxey Park 4345 28th Street (806) 795-6583 LaSalle Villas

Westfall, Peter H.

292

Pulse charging device  

SciTech Connect (OSTI)

This paper describes a device for pulse charging of capacitor storage devices of high-power nanosecond generators. The charging voltage reaches 30 kV, the charged capacitance is 2-100 nF, the charging time is 5-10 usec, the pulse frequency reaches 10 kHz, and the average power of the device is 15 kW. The device uses two-section oscillatory charging of the capacitors from a dc supply through high-speed thyristors and a pulse transformer. The described device is intended for use as part of a test bench for high-power nanosecond pulse generators for pumping gas lasers and their components.

Butakov, L.D.; Dubich, V.K.; Lashuk, N.A.; Shubkin, N.G.; Vizir', V.A.

1986-03-01T23:59:59.000Z

293

Fluidic nanotubes and devices  

DOE Patents [OSTI]

Fluidic nanotube devices are described in which a hydrophilic, non-carbon nanotube, has its ends fluidly coupled to reservoirs. Source and drain contacts are connected to opposing ends of the nanotube, or within each reservoir near the opening of the nanotube. The passage of molecular species can be sensed by measuring current flow (source-drain, ionic, or combination). The tube interior can be functionalized by joining binding molecules so that different molecular species can be sensed by detecting current changes. The nanotube may be a semiconductor, wherein a tubular transistor is formed. A gate electrode can be attached between source and drain to control current flow and ionic flow. By way of example an electrophoretic array embodiment is described, integrating MEMs switches. A variety of applications are described, such as: nanopores, nanocapillary devices, nanoelectrophoretic, DNA sequence detectors, immunosensors, thermoelectric devices, photonic devices, nanoscale fluidic bioseparators, imaging devices, and so forth.

Yang, Peidong (El Cerrito, CA); He, Rongrui (El Cerrito, CA); Goldberger, Joshua (Berkeley, CA); Fan, Rong (El Cerrito, CA); Wu, Yiying (Albany, CA); Li, Deyu (Albany, CA); Majumdar, Arun (Orinda, CA)

2010-01-10T23:59:59.000Z

294

Planar electrochemical device assembly  

DOE Patents [OSTI]

A pre-fabricated electrochemical device having a dense electrolyte disposed between an anode and a cathode preferably deposited as thin films is bonded to a porous electrically conductive support. A second porous electrically conductive support may be bonded to a counter electrode of the electrochemical device. Multiple electrochemical devices may be bonded in parallel to a single porous support, such as a perforated sheet to provide a planar array. Planar arrays may be arranged in a stacked interconnected array. A method of making a supported electrochemical device is disclosed wherein the method includes a step of bonding a pre-fabricated electrochemical device layer to an existing porous metal or porous metal alloy layer.

Jacobson; Craig P. (Lafayette, CA), Visco; Steven J. (Berkeley, CA), De Jonghe; Lutgard C. (Lafayette, CA)

2010-11-09T23:59:59.000Z

295

Recommendation 186: Option Periods in Prime Contract Language  

Broader source: Energy.gov [DOE]

The inclusion of option periods in the language of all future DOE Request for Proposals for prime contracts when appropriate.

296

IIIPRISMA System Operator's Manual PRISMA Therapy Options ............................................................................. 2  

E-Print Network [OSTI]

IIIPRISMA System Operator's Manual ... PRISMA Therapy Options .................................................................................................... PRISMA System ............................... xvi Operator's Manual ......................................................... #12;PRISMA System Operator's Manual ia Controller CCA

Kay, Mark A.

297

Hydrogen cooling options for MgB{sub 2}-based superconducting systems  

SciTech Connect (OSTI)

With the arrival of MgB{sub 2} for low-cost superconducting magnets, hydrogen cooling has become an interesting alternative to costly liquid helium. Hydrogen is generally regarded as the most efficient coolant in cryogenics and, in particular, is well suited for cooling superconducting magnets. Cooling methods need to take into account the specific quench propagation in the MgB{sub 2} magnet winding and facilitate a cryogenically reliable and safe cooling environment. The authors propose three different multi-coolant options for MRI scanners using helium or hydrogen within the same design framework. Furthermore, a design option for whole-body scanners which employs technology, components, fueling techniques and safety devices from the hydrogen automotive industry is presented, continuing the trend towards replacing helium with hydrogen as a safe and cost efficient coolant.

Stautner, W.; Xu, M.; Mine, S.; Amm, K. [Electromagnetics and Superconductivity Lab, GE Global Research, Niskayuna, NY 12309 (United States)

2014-01-29T23:59:59.000Z

298

OPTIONS FOR ABATING GREENHOUSE GASES FROM EXHAUST STREAMS.  

SciTech Connect (OSTI)

This report examines different alternatives for replacing, treating, and recycling greenhouse gases. It is concluded that treatment (abatement) is the only viable short-term option. Three options for abatement that were tested for use in semiconductor facilities are reviewed, and their performance and costs compared. This study shows that effective abatement options are available to the photovoltaic (PV) industry, at reasonable cost.

FTHENAKIS,V.

2001-12-01T23:59:59.000Z

299

THE COSTS AND BENEFITS OF A PUBLIC OPTION IN  

E-Print Network [OSTI]

THE COSTS AND BENEFITS OF A PUBLIC OPTION IN HEALTH CARE REFORM: An Economic Analysis Ethan Kaplan and Benefits of a Public Option in Health Care Reform: An Economic Analysis ACKNOWLEDGMENTS We would like Security|The Costs and Benefits of a Public Option in Health Care Reform: An Economic Analysis EXECUTIVE

Kammen, Daniel M.

300

Unipolar arc simulation device  

SciTech Connect (OSTI)

We describe a simple laboratory device for establishing a vacuum arc plasma discharge that can serve to simulate a unipolar arc. The technique makes use of a triggered vacuum arc plasma gun to generate a plasma plume that in turn causes breakdown of a secondary discharge. The device is in fact a secondary vacuum arc discharge that is triggered by a primary vacuum arc discharge, with some of the features of the secondary plasma discharge having similarities with a unipolar arc configuration. Here we describe the experimental setup and outline how the device can be used for some areas of unipolar arc materials research. [copyright] [ital 1999 American Institute of Physics.

Wang, S.G.; Brown, I.G. (Lawrence Berkeley National Laboratory, University of California, Berkeley, California 94720 (United States))

1999-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Identifying Project Potential and Options Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Identifying Project Potential and Options Webinar Identifying Project Potential and Options Webinar Identifying Project Potential and Options Webinar April 30, 2014 11:00AM MDT Attendees will understand the components of identifying energy project potential and options. Presenters will discuss market considerations, initial site considerations, project savings or rate-of-return estimates, production potential, final site selection, tribal options, finance, partnerships, and participation processes. Attendees will also become familiar with data gathering and analysis procedures such as tribal facility electric cost data, regulations, and interconnection requirements; paths to market for project power; and renewable sales, risks; and utility rules. By following the steps outlined in the webinar, Tribes can determine

302

Empowering Variable Renewables: Options for Flexible Electricity Systems |  

Open Energy Info (EERE)

Empowering Variable Renewables: Options for Flexible Electricity Systems Empowering Variable Renewables: Options for Flexible Electricity Systems Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Empowering Variable Renewables: Options for Flexible Electricity Systems Agency/Company /Organization: International Energy Agency Sector: Energy Focus Area: Renewable Energy Topics: Market analysis, Technology characterizations Resource Type: Publications Website: www.iea.org/g8/2008/Empowering_Variable_Renewables.pdf Empowering Variable Renewables: Options for Flexible Electricity Systems Screenshot References: Empowering Variable Renewables: Options for Flexible Electricity Systems[1] Summary "Increasing the share of renewables in energy portfolios is a key tool in the drive to reduce anthropogenic carbon dioxide emissions, as well as

303

Health Surveillance Outcomes in Former Rocky Flats Radiation Workers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Surveillance of Rocky Flats Radiation Workers Surveillance of Rocky Flats Radiation Workers Janice P. Watkins 1 , Elizabeth D. Ellis 1 , F. Joseph Furman 2 , Roger B. Falk 2 , Joe M. Aldrich 2 , and Donna L. Cragle 1 ORAU Technical Report # 2006-0408 1 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; P.O. Box 117; Oak Ridge, TN 37831-0117 2 Oak Ridge Institute for Science and Education, Center for Epidemiologic Research; 9950 W. 80 th Avenue, Suite 17; Arvada, CO 80005-3914 This report was funded by Department of Energy Environmental Health Division under contract number DE-AC05-00OR22750. Table of Contents List of Figures.................................................................................................................2 List of Tables

304

East Flat Rock, North Carolina: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Flat Rock, North Carolina: Energy Resources Flat Rock, North Carolina: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2801166°, -82.4220631° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2801166,"lon":-82.4220631,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

305

Big Flats, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Flats, Wisconsin: Energy Resources Flats, Wisconsin: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 44.111913°, -89.8079032° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.111913,"lon":-89.8079032,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

306

DOE - Office of Legacy Management -- Rocky Flats Archive  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Archive Archive Rocky Flats Site, Colorado Key Document Archive All documents are Adobe Acrobat files. pdf_icon NEPA - Rocky Flats Surface Water Configuration Environmental Assessment (EA) Site-Specific Uranium Standards Petition Site Surveillance and Maintenance Reports Quarterly Reports 2013 3rd Quarter 2nd Quarter Overview 1st Quarter Overview 2012 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2011 3rd Quarter Overview 2nd Quarter Overview 1st Quarter Overview 2010 3rd Ouarter Overview 2nd Ouarter Overview 1st Quarter Overview 2009 1st Quarter Overview 2nd Ouarter Overview 3rd Quarter Overview 2008 1st Quarter Overview 2nd Quarter Overview 3rd Quarter Overview 2007 1st Quarter Overview 2nd Quarter Overview 3rd Quarter Overview 2006

307

Plane-parallel waves as duals of the flat background  

E-Print Network [OSTI]

We give a classification of non-Abelian T-duals of the flat metric in D=4 dimensions with respect to the four-dimensional continuous subgroups of the Poincare group. After dualizing the flat background, we identify majority of dual models as conformal sigma models in plane-parallel wave backgrounds, most of them having torsion. We give their form in Brinkmann coordinates. We find, besides the plane-parallel waves, several diagonalizable curved metrics with nontrivial scalar curvature and torsion. Using the non-Abelian T-duality, we find general solution of the classical field equations for all the sigma models in terms of d'Alembert solutions of the wave equation.

Ladislav Hlavaty; Ivo Petr

2014-12-03T23:59:59.000Z

308

Actinide solution processing at the Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1039, for radioactive solution removal and processing at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for solution removal and processing is in response to independent safety assessments and an agreement with the State of Colorado to remove mixed residues at Rocky Flats and reduce the risk of future accidents. Monthly public meetings were held during the scoping and preparation of the EA. The scope of the EA included evaluations of alternative methods and locations of solution processing. A comment period from February 20, 1995 through March 21, 1995 was provided to the public and the State of Colorado to offer written comment on the EA. Comments were received from the State of Colorado and the U.S. Environmental Protection Agency. A response to the agency comments is included in the Final EA.

NONE

1995-04-01T23:59:59.000Z

309

Colorado and the Accelerated Cleanup at Rocky Flats  

SciTech Connect (OSTI)

When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

Spreng, C. [Public Health and Environment, Colorado Dept., Denver, CO (United States)

2007-07-01T23:59:59.000Z

310

Facility overview for commercial application of selected Rocky Flats facilities  

SciTech Connect (OSTI)

The purpose of this Facility Overview is to support the Rocky Flats Local Impacts Initiative`s Request for Interest, to solicit interest from commercial corporations for utilizing buildings 865 and 883, and the equipment contained within each building, for a commercial venture. In the following sections, this document describes the Rocky Flats Site, the buildings available for lease, the equipment within these buildings, the site services available to a tenant, the human resources available to support operations in buildings 865 and 883, and the environmental condition of the buildings and property. In addition, a brief description is provided of the work performed to date to explore the potential products that might be manufactured in Buildings 865 and 883, and the markets for these products.

NONE

1996-11-01T23:59:59.000Z

311

Implementing DOE guidance for hazards assessments at Rocky Flats Plant  

SciTech Connect (OSTI)

Hazards Assessments are performed for a variety of activities and facilities at Rocky Flats Plant. Prior to 1991, there was no guidance for performing Hazards Assessments. Each organization that performed Hazards Assessments used its own methodology with no attempt at standardization. In 1991, DOE published guidelines for the performance of Hazards Assessments for Emergency Planning (DOE-EPG-5500.1, ``Guidance for a Hazards Assessment Methodology``). Subsequently, in 1992, DOE published a standard for the performance of Hazards Assessments (DOE-STD-1027-92, ``Hazard Categorization and Accident Analysis, Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports``). Although these documents are a step in the direction of standardization, there remains a great deal of interpretation and subjective implementation in the performance of Hazards Assessments. Rocky Flats Plant has initiated efforts to develop a uniform and standard process to be used for Hazards Assessments.

Zimmerman, G.A.

1993-06-01T23:59:59.000Z

312

Wireless device monitoring systems and monitoring devices, and associated methods  

DOE Patents [OSTI]

Wireless device monitoring systems and monitoring devices include a communications module for receiving wireless communications of a wireless device. Processing circuitry is coupled with the communications module and configured to process the wireless communications to determine whether the wireless device is authorized or unauthorized to be present at the monitored area based on identification information of the wireless device. Methods of monitoring for the presence and identity of wireless devices are also provided.

McCown, Steven H; Derr, Kurt W; Rohde, Kenneth W

2014-05-27T23:59:59.000Z

313

Automated Surface Observing System: Standby Power Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Automated Automated Surface Observing System Standby Options Power Automated Surface Observing System (ASOS) General System Description * Self contained group of sensors and data gathering equipment that produces an automated weather observation * Weather observations support aviation, climate data, non government weather operations, public consumption, etc. * Initial deployment began in 1991 and continued through 1997 * Located at 884 sites nationwide, normally at airports * System has two distinct subsystems: Field installed equipment (DCP & Sensor Group) and an indoor processor (ACU) with peripherals * Separate facility power for DCP & Sensors and ACU 1 * measure and collect data * Located on the airport * back up group for 10 minutes * Currently pl

314

Distillation: Still towering over other options  

SciTech Connect (OSTI)

Distillation dominates separations in the chemical process industries (CPI), at least for mixtures that normally are processed as liquids. The authors fully expect that distillation will continue to be the method of choice for many separations, and the method against which other options must be compared. So, in this article, they will put into some perspective just why distillation continues to reign as the king of separations, and what steps are being taken to improve its applicability and performance, as well as basic understanding of the technique.

Kunesh, J.G. [Fractionation Research, Inc., Stillwater, OK (United States); Kister, H.Z. [Brown and Root, Inc., Alhambra (Canada); Lockett, M.J. [Praxair, Inc., Tonawanda, NY (United States); Fair, J.R. [Univ. of Texas, Austin, TX (United States)

1995-10-01T23:59:59.000Z

315

Evaluating the fluidized bed combustion options  

SciTech Connect (OSTI)

The proceedings from a conference on fluidized bed combustion are now available. The book discusses the immediate availability of atmospheric fluidized bed combustion technology as a practical, environmentally sound option for burning all grades of coal, wood, wood wastes, and biomass. The economics and technical fundamentals of atmospheric FBC are explained for the benefit of owners and managers of industrial boilers, boiler operators, architects/engineers, boiler manufacturers, and fuel suppliers. More than 15 FBC experts have contributed their expertise and experiences to the book.

Sheahan, R.T. (ed.)

1984-01-01T23:59:59.000Z

316

Special Review of the Rocky Flats Closure Project Site  

Broader source: Energy.gov (indexed) [DOE]

April April 2001 Special Review of the Integrated Safety Management ISM OVERSIGHT Table of Contents EXECUTIVE SUMMARY ............................................................................... 1 1.0 INTRODUCTION ...................................................................................... 6 2.0 FOCUSED REVIEW OF THE INTEGRATED WORK CONTROL PROCESS AND LINE MANAGEMENT OVERSIGHT .............................................................................................. 8 2.1 Background ...................................................................................... 8 2.2 Line Management Oversight and Selected Other Management Systems .................................................................... 10 2.3 Rocky Flats Closure Project Integrated Work Control Process

317

Regular maximal slicings in asymptotically flat space?times  

Science Journals Connector (OSTI)

An estimate is provided for the lapse function defining asymptotically Euclidean maximal slicings in asymptotically flat space?times. This estimate is found to be in agreement with a similar estimate suggested on heuristic grounds by Smarr and York. It is also shown that in vacuum space?times the scalar curvature of maximal slices remains uniformly bounded in time provided that suitable conditions on the rate of growth of the (negative) lower bound of the Ricci curvature of the slices are satisfied.

Mauro Carfora

1985-01-01T23:59:59.000Z

318

MEASURING THE JET POWER OF FLAT-SPECTRUM RADIO QUASARS  

SciTech Connect (OSTI)

We use frequency-dependent position shifts of flat-spectrum radio cores to estimate the kinetic power of active galactic nucleus (AGN) jets. We find a correlation between the derived jet powers and AGN narrow-line luminosity, consistent with the well-known relation for radio galaxies and steep spectrum quasars. This technique can be applied to intrinsically weak jets even at high redshift.

Shabala, S. S.; Santoso, J. S. [School of Mathematics and Physics, University of Tasmania, Private Bag 37, Hobart, TAS 7001 (Australia); Godfrey, L. E. H. [International Centre for Radio Astronomy Research, Curtin University, GPO Box U1987, Perth, Western Australia 6845 (Australia)

2012-09-10T23:59:59.000Z

319

Distributed Roughness Receptivity in a Flat Plate Boundary Layer  

E-Print Network [OSTI]

- Distributed Receptivity . . . . . 6 2. FACILITY DESCRIPTION - THE KLEBANOFFSARIC WIND TUNNEL 11 2.1 Test Section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 2.2 Fan and Motor... of this dissertation describes the KlebanoffSaric Wind Tunnel facility, which was used for this experiment. Section 3 describes the experimental setup (roughness design and the flat plate model) and defines the metrics by which the flow field is decomposed...

Kuester, Matthew Scott

2014-04-18T23:59:59.000Z

320

Rocky Flats Plant Site Environmental Report: 1993 Highlights  

SciTech Connect (OSTI)

The Rocky Flats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report.

Not Available

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DECOMMISSIONING CHALLENGES AT THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

SciTech Connect (OSTI)

This paper presents a discussion of the demolition of the Building 788 cluster at the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The Building 788 Cluster was a Resource Conservation and Recovery Act (RCRA) permitted storage facilities and ancillary structures. Topics covered include the methods employed for Project Planning, Regulatory Compliance, Waste Management, Hazard Identification, Radiological Controls, Risk Management, Field Implementation, and Cost Schedule control, and Lessons Learned and Project Closeout.

Dorr, K. A.; Hoover, J.

2002-02-25T23:59:59.000Z

322

Inspection of management of excess personal property at Rocky Flats  

SciTech Connect (OSTI)

Inspection revealed that immediate management attention is needed to properly control, store, and dispose of excess personal property at Rocky Flats. Current system of operation does not allow for efficient, timely, cost effective management; current storage and disposal practices are not consistent with contract requirements or DOE policies and procedures. Other deficiencies are pointed out. Results of inspection are divided into 4 sections: contract changeover issues, moratorium issues, additional excess property issues, and award fee observations. Recommendations are outlined.

Not Available

1993-05-17T23:59:59.000Z

323

Bring Your Own Device  

Broader source: Energy.gov [DOE]

Bring your own Device, or BYOD, has been a popular topic for some time now. While government organizations and private companies continue to struggle with how to enjoy the business and economic...

324

Optical Signal Processing Devices  

Science Journals Connector (OSTI)

In the previous chapters we have presented advanced optoelectronic devices which performed a specific task: generation of coherent radiation, modulation, light detection or multi/demultiplexing. In this chapte...

Professor Daniela Dragoman; Professor Mircea Dragoman

1999-01-01T23:59:59.000Z

325

Multimaterial rectifying device fibers  

E-Print Network [OSTI]

Electronic and optoelectronic device processing is commonly thought to be incompatible with much simpler thermal drawing techniques used in optical fiber production. The incorporation of metals, polymer insulators, and ...

Orf, Nicholas D

2009-01-01T23:59:59.000Z

326

Ion Channels as Devices  

Science Journals Connector (OSTI)

Ion channels are proteins with a hole down ... biological function. Channels are devices in the engineering sense of the word and engineering analysis helps understand their function. In particular ... The curren...

Bob Eisenberg

2003-12-01T23:59:59.000Z

327

Multimaterial multifunctional fiber devices  

E-Print Network [OSTI]

Optical fibers and semiconductor devices differ significantly in their properties and their processing approaches. The latter require an assembly of metal, insulator and semiconductor materials into complex geometries with ...

Sorin, Fabien

2008-01-01T23:59:59.000Z

328

Sex, dispersion and aggression in Western Sandpipers on the Bolivar Flats, Texas  

E-Print Network [OSTI]

Flats, located on the Bolivar Peninsula, 4. 8 km northeast of Galveston, Texas. The wintering range of Western Sandpipers extends from California and North Carolina in the north, south to Peru and Surinam (AOU 1983). The Bolivar Flats, located...

Gordon, Lynn Marie

2012-06-07T23:59:59.000Z

329

Spectrally Solar Selective Coatings for Colored Flat Plate Solar Thermal Collectors  

Science Journals Connector (OSTI)

The paper is a review on the state-of-the-art on colored materials (absorbers and glazings) for solar thermal flat plate collectors obtained world-wide. The ... input for novel, market-acceptable flat plate solar

Luminita Isac; Alexandru Enesca

2014-01-01T23:59:59.000Z

330

Map of mixed prairie grassland vegetation, Rocky Flats, Colorado  

SciTech Connect (OSTI)

A color vegetation map at the scale of 1:12,000 of the area surrounding the Rocky Flats, Rockwell International Plant near Boulder, Colorado, provides a permanent record of baseline data which can be used to monitor changes in both vegetation and environment and thus to contribute to future land management and land-use policies. Sixteen mapping units based on species composition were identified, and characterized by two 10-m/sup 2/ vegetation stands each. These were grouped into prairie, pasture, and valley side on the basis of their species composition. Both the mapping units and these major groups were later confirmed by agglomerative clustering analysis of the 32 vegetation stands on the basis of species composition. A modified Bray and Curtis ordination was used to determine the environmental factor complexes controlling the distribution of vegetation at Rocky flats. Recommendations are made for future policies of environmental management and predictions of the response to environmental change of the present vegetation at the Rocky Flats site.

Clark, S J.V.; Webber, P J; Komarkova, V; Weber, W A

1980-01-01T23:59:59.000Z

331

The US Department of Energy`s facility reuse at the Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

This audit was initiated to determine whether the Rocky Flats Environmental Technology Site was maximizing its reuse of excess facilities.

NONE

1998-08-01T23:59:59.000Z

332

Development of stripper options for FRIB  

SciTech Connect (OSTI)

The US Department of Energy Facility for Rare Isotope Beams (FRIB) at Michigan State University includes a heavy ion superconducting linac capable of accelerating all ions up to uranium with energies higher than 200 MeV/u and beam power up to 400 kW. To achieve these goals with present ion source performance it is necessary to accelerate simultaneously two charge states of uranium from the ion source in the first section of the linac. At an energy of approximately 16.5 MeV/u it is planned to strip the uranium beam to reduce the voltage needed in the rest of the linac to achieve the final energy. Up to five different charge states are planned to be accelerated simultaneously after the stripper. The design of the stripper is a challenging problem due to the high power deposited (approximately 0.7 kW) in the stripper media by the beam in a small spot. To assure success of the project we have established a research and development program that includes several options: carbon or diamond foils, liquid lithium films, gas strippers and plasma strippers. We present in this paper the status of the different options.

Marti, F.; Hershcovitch, A.; Momozaki, Y.; Nolen, J.; Reed, C.; Thieberger, P.

2010-09-12T23:59:59.000Z

333

Cementitious waste option scoping study report  

SciTech Connect (OSTI)

A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

Lee, A.E.; Taylor, D.D.

1998-02-01T23:59:59.000Z

334

Evaluating home heating options in Krakow  

SciTech Connect (OSTI)

The city of Krakow, Poland, has poor air quality due, in part, to widespread use of coal for heating. Engineering analyses have been conducted to determine the technical feasibility and capital costs for a number of options for reducing pollution from home heating sources. Capital costs range from $90 per kilowatt (kW) to connect local boiler-houses to the district heating system to $227/kW to upgrade the electrical system and convert coal stoves to electric heat. Air quality analyses have estimated the reduction in pollutant emissions as well as in pollutant concentrations that would result from implementing the options under consideration. Significant reductions can be obtained at a lower cost by using briquettes instead of coal in home stoves than by converting the stoves to electricity or gas. Finally, incentives analyses are examining the cost-effectiveness of the various alternatives and identifying possible incentives that the city could provide to encourage adoption of less-polluting technologies and practices.

Bleda, J.; Nedoma, J.; Bardel, J.; Pierce, B.

1995-08-01T23:59:59.000Z

335

Cryogenic focal plane flatness measurement with optical zone slope Jerry Edelstein1  

E-Print Network [OSTI]

Cryogenic focal plane flatness measurement with optical zone slope tracking Jerry Edelstein1 to determine the surface flatness of a cryogenic sensor array developed for the JDEM mission. Large focal such as JDEM, WFIRST, or EUCLID must operate at cryogenic temperatures while maintaining focal plane flatness

California at Berkeley, University of

336

SIGNIFICANT NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE  

E-Print Network [OSTI]

SIGNIFICANT NATURAL HERITAGE RESOURCES OF THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE to assess the ecological values of the Rock Creek drainage at the Rocky Flats Environmental Technology Site from existing data at the Rocky Flats Environmental Technology Site. 2.Perform ground surveys to rank

337

A lowstand epikarstic intertidal flat from the middle Silurian of Gotland, Sweden  

E-Print Network [OSTI]

flat and rocky shore to the knowledge of Silurian karst. It forms the unconform- able boundary betweenA lowstand epikarstic intertidal flat from the middle Silurian of Gotland, Sweden Mikael Calner of a karstic flat setting. Four microfacies with different stable isotopic signatures are recognised across

Calner, Mikael

338

A Simple Audio Conductivity Device  

Science Journals Connector (OSTI)

A Simple Audio Conductivity Device ... To solve these problems, the authors have built a simple audio conductivity device that is very sensitive to current flow. ...

Gregory Berenato; David F. Maynard

1997-04-01T23:59:59.000Z

339

Electrical apparatus lockout device  

SciTech Connect (OSTI)

A simple lockout device for electrical equipment equipped with recessed power blades is described. The device comprises a face-plate (12) having a threaded member (14) attached thereto and apertures suitable for accommodating the power blades of a piece of electrical equipment, an elastomeric nose (16) abutting the face-plate having a hole for passage of the threaded member therethrough and power blade apertures in registration with those of the face-plate, a block (20) having a recess (34) in its forward face for receiving at least a portion of the hose, a hole therein for receiving the threaded member and an integral extension (26) extending from its rear face. A thumb screw (22) suitable for turning with the hands and having internal threads suitable for engaging the threaded member attached to the face-plate is inserted into a passage in the integral extension to engage the threaded member in such a fashion that when the device is inserted over the recessed power blades of a piece of electrical equipment and the thumb screw (22) tightened, the elastomeric nose (16) is compressed between the face-plate (12) and the block (20) forcing it to expand laterally thereby securing the device in the recess and precluding the accidental or intentional energization of the piece of equipment by attachment of a power cord to the recessed power blades. Means are provided in the interval extension and the thumb screw for the attachment of a locking device (46) which will satisfy OSHA standards.

Gonzales, R.

1999-10-12T23:59:59.000Z

340

Electrical apparatus lockout device  

DOE Patents [OSTI]

A simple lockout device for electrical equipment equipped with recessed power blades is described. The device comprises a face-plate (12) having a threaded member (14) attached thereto and apertures suitable for accommodating the power blades of a piece of electrical equipment, an elastomeric nose (16) abutting the face-plate having a hole for passage of the threaded member therethrough and power blade apertures in registration with those of the face-plate, a block (20) having a recess (34) in its forward face for receiving at least a portion of the hose, a hole therein for receiving the threaded member and an integral extension (26) extending from its rear face. A thumb screw (22) suitable for turning with the hands and having internal threads suitable for engaging the threaded member attached to the face-plate is inserted into a passage in the integral extension to engage the threaded member in such a fashion that when the device is inserted over the recessed power blades of a piece of electrical equipment and the thumb screw (22) tightened, the elastomeric nose (16) is compressed between the face-plate (12) and the block (20) forcing it to expand laterally thereby securing the device in the recess and precluding the accidental or intentional energization of the piece of equipment by attachment of a power cord to the recessed power blades. Means are provided in the interval extension and the thumb screw for the attachment of a locking device (46) which will satisfy OSHA standards.

Gonzales, Rick (Chesapeake, VA)

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

On the charcterization of wakes from three-dimensional single and multiple flat plates on a ground plane.  

E-Print Network [OSTI]

??A flat plate is a simplified model for a heliostat, which is a large flat tracking mirror used to reflect solar energy onto a central (more)

Barton, Gregory Harold

1985-01-01T23:59:59.000Z

342

POLICY OPTIONS FOR FCV MARKET INTRODUCTION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

G. Duleep G. Duleep Energy and Environmental Analysis, Inc. www.eea-inc.com POLICY OPTIONS FOR FCV MARKET INTRODUCTION Prepared for: Hydrogen 2010-2025 Scenario Analysis Meeting Introduction Phases Phase 1 - sales of few hundred FCVs per year. Cost of vehicles will be 5 x over average vehicle and refueling infrastructure will be in an urban area. Phase 2 - ten to twenty thousand FCVs per model and one/two models per major manufacturer. Cost of vehicles will be 2 x over average vehicle, and urban and limited regional refueling infrastructure. Phase 3 - Mass market introduction, FCV cost at 1.1 to 1.2 x. Good regional refueling and limited city pair refueling sites. Policies for Phase 1 Vehicles will not be sold commercially but leased to select fleets and owners. Government fleet buy-

343

IAAP. However, Pantex Plant Option 2  

Office of Legacy Management (LM)

p,./qj ' . p,./qj ' . ,! Fdera~ Regbter / Vol. 4Q, No. 210 / Mot&lap, October 29, 3984 1 Notices 43493 be the optimal choice. However, for eignificantly lower caste, a major upgrade of existing facilitiee, including new constr@ion. will provide improved operational reliability and protection. Consequently, an all new facility at any of the three alternative locations was eliminated due to cost considerations. From the standpoint of environmental impact from normal operations (including offsite transportation end the risk of an accident-producing release of radioactive materials, there is little difference between existing operations at Pantex and partial relocation to IAAP. However, Pantex Plant Option 2 provided a greater degree of operational reliability and protection than the

344

OPTIONAL I-""... ..o SD  

Office of Legacy Management (LM)

OPTIONAL I-""... ..o SD , * ' y)IP-lW ' a * UNITED S T A T E S COVEKNMENT TO : Files DATE: September 25, 1962 M o m 4' Materials Branch; Division of Licensing & Regulation SUBJECT: PRE-LICENSING VISIT TO THE CONTEMPORARY METALS CORPORATION PROPOSED FACILITY AT HAZELWOOD, M ISSOURI, AND RESIDUE STOCKPILES AT ROBERTSON, M ISSOURI, DOCKET NO, 40-6811 The Contemporary Metals Corporation was awarded a contract by the AEC for the removal of uranium -bearing residues from stock- pile areas at Robertson, M issouri. These residues were generated by the Commission at its Destrehan Street Plant, St; Louis, M issouri. The applicant intends to process these residues at its Hazelwocd facility which is about three (3) m iles from the stock- pile site, Attempts will be made to extract the associated

345

UNDP-Climate Finance Options Platform | Open Energy Information  

Open Energy Info (EERE)

UNDP-Climate Finance Options Platform UNDP-Climate Finance Options Platform Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNDP-Climate Finance Options Platform Agency/Company /Organization: United Nations Development Programme, World Bank Sector: Energy Focus Area: Energy Efficiency, Renewable Energy Topics: Finance Website: www.climatefinanceoptions.org/cfo/ Cost: Free UNDP-Climate Finance Options Platform Screenshot References: UNDP-Climate Finance Options Platform[1] "This Climate Finance Options platform, launched under the chapeau "Acting on Climate Change: The UN System Delivering As One", addresses information needs on the multitude of funds available for climate action in developing countries. Based on the UNFCCC framework, the platform is composed of two complementary domains (one led by UNFCCC and one by

346

Green Power Network: Mandatory Utility Green Power Option  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mandatory Utility Green Power Option Mandatory Utility Green Power Option A number of states have adopted policies requiring or encouraging electricity suppliers to offer green power options to consumers. This section provides summaries of these policies and links to the full text of the legislation or public utility commission rules. Connecticut Iowa Maine Minnesota Montana New Jersey New Mexico Oregon Vermont Virginia Washington Connecticut June 2003—On June 26, Connecticut Governor John G. Rowland signed a bill (SB 733) amending the state's Electric Restructuring Act and granting authority to the Department of Public Utility Control (DPUC) to require electric distribution companies to offer green power options. The legislation enables the DPUC to determine the terms and conditions of renewable energy or energy efficiency options, including the contract terms and the minimum percentage of electricity to be derived from renewable energy sources. The green energy options will be developed and implemented by third-party companies selected through a competitive bidding process.

347

Attachment C: Optional AIP Provisions | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

C: Optional AIP Provisions C: Optional AIP Provisions Attachment C: Optional AIP Provisions Optional AIP Provisions This attachment contains sample language for a number of optional provisions that sites may choose to include or not to include in their AIPs. Optional AIP provisions are not mandatory and the language presented is a sample which may be used as is, serve as a guideline for the creation of a modified provision to suit the site-specific needs of a particular AIP program, or not included in a new or renegotiated AIP. 1. Public Participation/Public Accountability in the DOE Planning Process "The DOE will make available to the public in a timely manner all environmental planning documents that require public comment. The DOE will promptly reply to, and confirm receipt of, requests for information

348

Fragment capture device  

DOE Patents [OSTI]

A fragment capture device for use in explosive containment. The device comprises an assembly of at least two rows of bars positioned to eliminate line-of-sight trajectories between the generation point of fragments and a surrounding containment vessel or asset. The device comprises an array of at least two rows of bars, wherein each row is staggered with respect to the adjacent row, and wherein a lateral dimension of each bar and a relative position of each bar in combination provides blockage of a straight-line passage of a solid fragment through the adjacent rows of bars, wherein a generation point of the solid fragment is located within a cavity at least partially enclosed by the array of bars.

Payne, Lloyd R. (Los Lunas, NM); Cole, David L. (Albuquerque, NM)

2010-03-30T23:59:59.000Z

349

Biochip scanner device  

DOE Patents [OSTI]

A biochip scanner device used to detect and acquire fluorescence signal data from biological microchips or biochips and method of use are provided. The biochip scanner device includes a laser for emitting a laser beam. A modulator, such as an optical chopper modulates the laser beam. A scanning head receives the modulated laser beam and a scanning mechanics coupled to the scanning head moves the scanning head relative to the biochip. An optical fiber delivers the modulated laser beam to the scanning head. The scanning head collects the fluorescence light from the biochip, launches it into the same optical fiber, which delivers the fluorescence into a photodetector, such as a photodiode. The biochip scanner device is used in a row scanning method to scan selected rows of the biochip with the laser beam size matching the size of the immobilization site.

Perov, Alexander (Troitsk, RU); Belgovskiy, Alexander I. (Mayfield Heights, OH); Mirzabekov, Andrei D. (Darien, IL)

2001-01-01T23:59:59.000Z

350

Electrochromic optical switching device  

DOE Patents [OSTI]

An electrochromic cell is disclosed which comprises an electrochromic layer, a polymerizable organo-sulfur layer which comprises the counter electrode of the structure, and an ionically conductive electronically insulating material which comprises the separator between the electrodes. In a preferred embodiment, both the separator and the organo-sulfur electrode (in both its charged and uncharged states) are transparent either to visible light or to the entire solar spectrum. An electrochromic device is disclosed which comprises such electrodes and separator encased in glass plates on the inner surface of each of which is formed a transparent electrically conductive film in respective electrical contact with the electrodes which facilitates formation of an external electrical connection or contact to the electrodes of the device to permit electrical connection of the device to an external potential source. 3 figs.

Lampert, C.M.; Visco, S.J.

1992-08-25T23:59:59.000Z

351

Electrochromic optical switching device  

DOE Patents [OSTI]

An electrochromic cell is disclosed which comprises an electrochromic layer, a polymerizable organo-sulfur layer which comprises the counter electrode of the structure, and an ionically conductive electronically insulating material which comprises the separator between the electrodes. In a preferred embodiment, both the separator and the organo-sulfur electrode (in both its charged and uncharged states) are transparent either to visible light or to the entire solar spectrum. An electrochromic device is disclosed which comprises such electrodes and separator encased in glass plates on the inner surface of each of which is formed a transparent electrically conductive film in respective electrical contact with the electrodes which facilitates formation of an external electrical connection or contact to the electrodes of the device to permit electrical connection of the device to an external potential source.

Lampert, Carl M. (El Sobrante, CA); Visco, Steven J. (Berkeley, CA)

1992-01-01T23:59:59.000Z

352

Ion manipulation device  

DOE Patents [OSTI]

An ion manipulation method and device is disclosed. The device includes a pair of substantially parallel surfaces. An array of inner electrodes is contained within, and extends substantially along the length of, each parallel surface. The device includes a first outer array of electrodes and a second outer array of electrodes. Each outer array of electrodes is positioned on either side of the inner electrodes, and is contained within and extends substantially along the length of each parallel surface. A DC voltage is applied to the first and second outer array of electrodes. A RF voltage, with a superimposed electric field, is applied to the inner electrodes by applying the DC voltages to each electrode. Ions either move between the parallel surfaces within an ion confinement area or along paths in the direction of the electric field, or can be trapped in the ion confinement area.

Anderson, Gordon A; Smith, Richard D; Ibrahim, Yehia M; Baker, Erin M

2014-09-16T23:59:59.000Z

353

Nonaqueous Electrical Storage Device  

DOE Patents [OSTI]

An electrochemical capacitor is disclosed that features two, separated, high surface area carbon cloth electrodes sandwiched between two current collectors fabricated of a conductive polymer having a flow temperature greater than 130.degree. C., the perimeter of the electrochemical capacitor being sealed with a high temperature gasket to form a single cell device. The gasket material is a thermoplastic stable at temperatures greater than 100.degree. C., preferably a polyester or a polyurethane, and having a reflow temperature above 130.degree. C. but below the softening temperature of the current collector material. The capacitor packaging has good mechanical integrity over a wide temperature range, contributes little to the device equivalent series resistance (ESR), and is stable at high potentials. In addition, the packaging is designed to be easily manufacturable by assembly line methods. The individual cells can be stacked in parallel or series configuration to reach the desired device voltage and capacitance.

McEwen, Alan B. (Melrose, MA); Evans, David A. (Seekonk, MA); Blakley, Thomas J. (Woburn, MA); Goldman, Jay L. (Mansfield, MA)

1999-10-26T23:59:59.000Z

354

Organisms as cooperative ecosystem engineers in intertidal flats  

Science Journals Connector (OSTI)

Abstract The importance of facilitative interactions and organismal ecosystem engineering for establishing the structure of communities is increasingly being recognised for many different ecosystems. For example, soft-bottom tidal flats host a wide range of ecosystem engineers, probably because the harsh physico-chemical environmental conditions render these species of particular importance for community structure and function. These environments are therefore interesting when focusing on how ecosystem engineers interact and the consequences of these interactions on community dynamics. In this review, we initially detail the influence on benthic systems of two kinds of ecosystem engineers that are particularly common in tidal flats. Firstly, we examine species providing biogenic structures, which are often the only source of habitat complexity in these environments. Secondly, we focus on species whose activities alter sediment stability, which is a crucial feature structuring the dynamics of communities in tidal flats. The impacts of these engineers on both environment and communities were assessed but in addition the interaction between ecosystem engineers was examined. Habitat cascades occur when one engineer favours the development of another, which in turn creates or modifies and improves habitat for other species. Non-hierarchical interactions have often been shown to display non-additive effects, so that the effects of the association cannot be predicted from the effects of individual organisms. Here we propose the term of cooperative ecosystem engineering when two species interact in a way which enhances habitat suitability as a result of a combined engineering effect. Finally, we conclude by describing the potential threats for ecosystem engineers in intertidal areas, potential effects on their interactions and their influence on communities and ecosystem function.

Claire Passarelli; Frdric Olivier; David M. Paterson; Tarik Meziane; Cdric Hubas

2014-01-01T23:59:59.000Z

355

Precision alignment device  

DOE Patents [OSTI]

Apparatus for providing automatic alignment of beam devices having an associated structure for directing, collimating, focusing, reflecting, or otherwise modifying the main beam. A reference laser is attached to the structure enclosing the main beam producing apparatus and produces a reference beam substantially parallel to the main beam. Detector modules containing optical switching devices and optical detectors are positioned in the path of the reference beam and are effective to produce an electrical output indicative of the alignment of the main beam. This electrical output drives servomotor operated adjustment screws to adjust the position of elements of the structure associated with the main beam to maintain alignment of the main beam. 5 figs.

Jones, N.E.

1988-03-10T23:59:59.000Z

356

Phononic crystal devices  

DOE Patents [OSTI]

Phononic crystals that have the ability to modify and control the thermal black body phonon distribution and the phonon component of heat transport in a solid. In particular, the thermal conductivity and heat capacity can be modified by altering the phonon density of states in a phononic crystal. The present invention is directed to phononic crystal devices and materials such as radio frequency (RF) tags powered from ambient heat, dielectrics with extremely low thermal conductivity, thermoelectric materials with a higher ratio of electrical-to-thermal conductivity, materials with phononically engineered heat capacity, phononic crystal waveguides that enable accelerated cooling, and a variety of low temperature application devices.

El-Kady, Ihab F. (Albuquerque, NM); Olsson, Roy H. (Albuquerque, NM)

2012-01-10T23:59:59.000Z

357

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

358

Final Land Configuration for the Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B. [Parsons, 1700 Broadway, Suite 900, Denver, Colorado 80290 (United States); Davis, R. W. [Kaiser-Hill Company, LLC, 9193 S. Jamaica, Englewood, Colorado 80112 (United States)

2006-07-01T23:59:59.000Z

359

The Rocky Flats Environmental Technology Site beryllium characterization project  

SciTech Connect (OSTI)

A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found.

Morrell, D.M. [Kaiser-Hill Co. LLC, Golden, CO (United States); Miller, J.R. [Radian International LLC, Los Alamos, NM (United States); Allen, D.F. [Radian International LLC, Oak Ridge, TN (United States)

1999-06-01T23:59:59.000Z

360

Meteorology program status from Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

The meteorology program at Rocky Flats Environmental Technology Site (Site) has experienced significant changes the past 18 months. The purposes of the meteorology program at the Site are to (1) support Emergency Preparedness programs for assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance operations, health and safety related activities, and remediation operations. The meteorology program includes ambient monitoring, weather forecasting, climatological analyses, air dispersion modeling, and Emergency Preparedness organizational support.

Maxwell, D.R.

1996-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Directory of Standard, Optional and Other Agency Forms  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The directive lists the Directory of Standard, Optional and Other Agency Forms and includes a list of Departmental reports and forms managers. Cancels DOE 1322.4A.

1989-12-12T23:59:59.000Z

362

Transition Strategies: Government Options and Market Penetration Scenarios  

Broader source: Energy.gov [DOE]

Presentation on Transition Strategies: Government Options and Market Penetration Scenarios given by Sigmund Gronich of DOE during the DOE Hydrogen Transition Analysis Workshop on January 26, 2006.

363

Investigation of energy storage options for sustainable energy systems.  

E-Print Network [OSTI]

??Determination of the possible energy storage options for a specific source of energy requires a thorough analysis from the points of energy, exergy, and exergoeconomics. (more)

Hosseini, Mehdi

2013-01-01T23:59:59.000Z

364

Feebates: A Legislative Option to Encourage Continuous Improvements...  

Open Energy Info (EERE)

Feebates: A Legislative Option to Encourage Continuous Improvements to Automobile Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Feebates: A Legislative...

365

Assessment of Future Vehicle Transportation Options and their...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future Vehicle Transportation Options and Their Impact on the Electric Grid January 10, 2010 New Analysis of Alternative Transportation Technologies 3 What's New? * Additional...

366

DOE Exercises 5 Year Option on Washington TRU Solutions Contract...  

Energy Savers [EERE]

and operating the Department's Waste Isolation Pilot Plant (WIPP), located in New Mexico. The option DOE exercised is a part of the WIPP contract that was competitively...

367

Technological Options for Reducing Non-CO2 GHG Emissions  

Science Journals Connector (OSTI)

A project titled Clearinghouse of Technological Options for Reducing Anthropogenic Non-CO 2 GHG Emissions from All Sectors was recently conducted. The o...

Prof. Dr. Jeff Kuo Ph.D.; P.E.

2012-01-01T23:59:59.000Z

368

Decoupling Policies: Options to Encourage Energy Efficiency Policies...  

Broader source: Energy.gov (indexed) [DOE]

Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL)...

369

Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design  

E-Print Network [OSTI]

impact of improved hydrogen storage may be through makingand M. Gardiner, Hydrogen Storage Options: Technologies andscience related to hydrogen storage could change how a

Ogden, J; Yang, Christopher

2005-01-01T23:59:59.000Z

370

Waste Heat Management Options for Improving Industrial Process Heating Systems  

Broader source: Energy.gov [DOE]

This presentation covers typical sources of waste heat from process heating equipment, characteristics of waste heat streams, and options for recovery including Combined Heat and Power.

371

Option to Acquire or Divest a Joint Venture  

E-Print Network [OSTI]

of uncertainty in 4 If Vi(0) ? Vj(0), the exercise of the option is likely to be accelerated under Vi(0) > Vj(0) and i > j and decelerated under Vi(0) j. In addition, the initial negotiation on the formation of the JV is likely to be more...; Folta and Leiblein, 1994; Folta, 1998), there has been limited effort to scrutinize the properties of JV options (e.g., options to acquire, divest and expand) through rigorous theoretical modeling. As the extensive work on financial and real options...

Chi, Tailan

2000-01-01T23:59:59.000Z

372

Device Oriented Project Controller  

SciTech Connect (OSTI)

This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

Dalesio, Leo; Kraimer, Martin

2013-11-20T23:59:59.000Z

373

Condensate removal device  

DOE Patents [OSTI]

A condensate removal device is disclosed which incorporates a strainer in unit with an orifice. The strainer is cylindrical with its longitudinal axis transverse to that of the vapor conduit in which it is mounted. The orifice is positioned inside the strainer proximate the end which is remoter from the vapor conduit.

Maddox, James W. (Newport News, VA); Berger, David D. (Alexandria, VA)

1984-01-01T23:59:59.000Z

374

Solar Innovator | Alta Devices  

SciTech Connect (OSTI)

Selected to participate in the Energy Department's SunShot Initiative, Alta Devices produces solar cells that convert sunlight into electricity at world record-breaking levels of efficiency. Through its innovative solar technology Alta is helping bring down the cost of solar. Learn more about the Energy Department's efforts to advance solar technology at energy.gov/solar .

Mattos, Laila; Le, Minh

2012-01-01T23:59:59.000Z

375

Multiple gap photovoltaic device  

DOE Patents [OSTI]

A multiple gap photovoltaic device having a transparent electrical contact adjacent a first cell which in turn is adjacent a second cell on an opaque electrical contact, includes utilizing an amorphous semiconductor as the first cell and a crystalline semiconductor as the second cell.

Dalal, Vikram L. (Newark, DE)

1981-01-01T23:59:59.000Z

376

Recent progress in transparent oxide semiconductors: Materials and device application  

Science Journals Connector (OSTI)

This paper reviews our recent research progress on new transparent conductive oxide (TCO) materials and electronic and optoelectronic devices based on these materials. First, described are the materials including p-type materials, deep-UV transparent TCO(?-Ga2O3), epitaxially grown ITO with atomically flat surface, transparent electrochromic oxide (NbO2F), amorphous TCOs, and nanoporous semiconductor 12CaO7Al2O3. Second, presented are TCO-based electronic/optoelectronic devices realized to date, UV/blue LED and UV-sensors based on transparent pn junction and high performance transparent TFT using n-type TCO as an n-channel. Finally, unique optoelectronic properties (p-type degenerate conduction, transfer doping of carriers, RT-stable exciton, and large optical nonlinearity) originating from 2D-electronic nature in p-type layered oxychalcogenides are summarized along with the fabrication method of epitaxial thin films of these materials.

Hideo Hosono

2007-01-01T23:59:59.000Z

377

Symmetries of asymptotically flat electrovacuum spacetimes and radiation  

E-Print Network [OSTI]

Symmetries compatible with asymptotic flatness and admitting gravitational and electromagnetic radiation are studied by using the Bondi-Sachs-van der Burg formalism. It is shown that in axially symmetric electrovacuum spacetimes in which at least locally a smooth null infinity in the sense of Penrose exists, the only second allowable symmetry is either the translational symmetry or the boost symmetry. Translationally invariant spacetimes with in general a straight "cosmic string" along the axis of symmetry are non-radiative although they can have a non-vanishing news function. The boost-rotation symmetric spacetimes are radiative. They describe "uniformly accelerated charged particles" or black holes which in general may also be rotating - the axial and an additional Killing vector are not assumed to be hypersurface orthogonal. The general functional forms of both gravitational and electromagnetic news functions, and of the mass aspect and total mass of asymptotically flat boost-rotation symmetric spacetimes at null infinity are obtained. The expressions for the mass are new even in the case of vacuum boost-rotation symmetric spacetimes with hypersurface orthogonal Killing vectors. In Appendices some errors appearing in previous works are corrected.

J. Bicak; A. Pravdova

1998-08-25T23:59:59.000Z

378

Geologic and geotechnical assessment RFETS Building 371, Rocky Flats, Colorado  

SciTech Connect (OSTI)

This report describes the review and evaluation of the geological, geotechnical and geophysical data supporting the design basis analysis for the Rocky Flats Environmental Test Site (RFETS) Building 371. The primary purpose of the geologic and geotechnical reviews and assessments described herein are to assess the adequacy of the crustal and near surface rock and soil model used in the seismic analysis of Building 371. This review was requested by the RFETS Seismic Evaluation Program. The purpose was to determine the adequacy of data to support the design basis for Building 371, with respect to seismic loading. The objectives required to meet this goal were to: (1) review techniques used to gather data (2) review analysis and interpretations of the data; and (3) make recommendations to gather additional data if required. Where there were questions or inadequacies in data or interpretation, recommendations were made for new data that will support the design basis analysis and operation of Building 371. In addition, recommendations are provided for a geologic and geophysical assessment for a new facility at the Rocky Flats Site.

Maryak, M.E.; Wyatt, D.E.; Bartlett, S.F.; Lewis, M.R.; Lee, R.C.

1995-12-13T23:59:59.000Z

379

Excitation of Flat Panels by Laterally Uncorrelated Fluctuating Pressures  

Science Journals Connector (OSTI)

The response of flat rectangular panels excited by specific acoustic fields are mathematically analyzed. The acoustic fields are assumed to be divided into an arbitrary number of strip pressure distributions across the width of the panel. Each strip is assumed to be continuous along the length of the panel in the propagation direction. An acoustic pressure distribution such as this permits the study of joint acceptance squared coefficient frequency spectra for lateral strip?pressure correlation conditions that vary between 0 and 1. An investigation of the joint acceptance squared coefficients for the special case of a simply supported flat panel excited by laterally uncorrelated strip pressures was conducted and the results were compared with a previous analysis by Bozich. [Spatial Correlation in Structural?Acoustic Coupling J. Acoust. Soc. Am. 36 5258 (1964).] Combining Bozich's results with the present analysis yielded an upper and lower bound on the joint acceptance squared coefficient frequency spectra. As would be expected the ratio of the joint acceptance squared coefficients for lateral strip pressure correlation conditions of 0 and 1 was highly dependent on the lateral half?wave number and pressure strip width.

W. W. Boyd

1966-01-01T23:59:59.000Z

380

Pricing European Barrier Options Peter W.Buchen  

E-Print Network [OSTI]

barrier options which incorporate a con- stant rebate. The method exploits the symmetries and properties of elemen- tary solutions of the Black-Scholes partial differential equation. The rebate and non-rebate. If rebates apply then the first exit time densities through the barrier are also required. Barrier option

Sydney, University of

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

ICORE: Image Co-addition with Optional Resolution Enhancement  

E-Print Network [OSTI]

Masci * Implemented QA plot files. * Included ­wf option to control inverse variance weighting. When on. There is no warranty that the software described herein is free of bugs. This includes proper graceful program WCS and distortion keys). * Implemented auto-tiling option to support memory management for outlier

Masci, Frank

382

Equilibrium pricing bounds on option prices Marie Chazala  

E-Print Network [OSTI]

probability measure that is equivalent to the historical one, and under which the discounted price processesEquilibrium pricing bounds on option prices Marie Chazala and Ely`es Jouinib a CREST, France price at maturity, we derive an upper bound on the call option price by putting two kind of restrictions

Boyer, Edmond

383

Natural Gas Utilities Options Analysis for the Hydrogen  

E-Print Network [OSTI]

> Natural Gas Utilities Options Analysis for the Hydrogen Economy Hydrogen Pipeline R&D Project of strategic options for the natural gas industry as hydrogen energy systems evolve ­ Vehicle to encourage of tradeoffs ­ NY state qualifies natural gas-run fuel cells, CA only renewable hydrogen (potential for partial

384

American Options, Multiarmed Bandits, and Optimal Consumption Plans  

E-Print Network [OSTI]

American Options, Multi­armed Bandits, and Optimal Consumption Plans: A Unifying View By Peter Bank, and in the microeconomic theory of intertemporal consumption choice can all be reduced to the same problem of representing and phrases. American options, Gittins index, multi­armed bandits, optimal consumption plans, optimal stopping

Bank, Peter

385

Capital Expenditures, Financial Constraints, and the Use of Options  

E-Print Network [OSTI]

Capital Expenditures, Financial Constraints, and the Use of Options Tim Adam RMI Working Paper No@nus.edu.sg 1 #12;Capital Expenditures, Financial Constraints, and the Use of Options Abstract This paper of the author and do not necessarily reflect the views of NUS Risk Management Institute (RMI). #12;Capital

Chaudhuri, Sanjay

386

Investment options available through TIAA-CREF Columbia university  

E-Print Network [OSTI]

Investment options available through TIAA-CREF Columbia university Calvert Funds will be added and funds that are available as investment options, as well as the Calvert funds that will be available on the TIAA-CREF platform as of April 2, 2013. As described in the enclosed letter, if you currently invest

Grishok, Alla

387

Valuation and Optimal Exercise Strategy of Electricity Swing Options.  

E-Print Network [OSTI]

Valuation and Optimal Exercise Strategy of Electricity Swing Options. Gido Haarbrücker, Daniel Kuhn plateforme de recherche Alexandria https://www.alexandria.unisg.ch | 04.02.2014 Electricity swing options https://www.alexandria.unisg.ch | 04.02.2014 mot-clé energy, derivative pricing, electricity swing

Dalang, Robert C.

388

Front End Target Options K.T. McDonald  

E-Print Network [OSTI]

Front End ­ Target Options K.T. McDonald Princeton University (January 7, 2014) #12;Target System://puhep1.princeton.edu/~mcdonald/examples/accel/neuffer_ieeetns_28_2034_81.pdf Fernow et al. reviewed options in 1995: Li lenses, plasma lenses, toroidal horns, and solenoidal capture., http://puhep1

McDonald, Kirk

389

An option of "UCN pump" for ESS  

E-Print Network [OSTI]

The aim of this short note is to present an option for a source of ultracold neutrons (UCNs), which could profit from the pulse time-structure of the future ESS spallation neutron source in Lund, and thus which could produce a very high UCN density and a rather high UCN flux simultaneously. In order to realize this idea one has to install a relatively thin solid-deuterium UCN source in a close vicinity to the spallation target and to couple it with an extraction UCN guide with an entrance membrane window, which is moving periodically and synchronously with the operation cycle of the spallation source, as explained in the text below. This proposal profits from the fact that all characteristic parameters of the problem, such as the pulse duration of the ESS spallation source, the typical thickness of solid deuterium source that could be easily realized, the typical time of generation of UCNs in solid deuterium, the length and diameter of the extraction neutron guide and the time diagram of the membrane motion t...

Nesvizhevsky, Valery V

2014-01-01T23:59:59.000Z

390

Renewable Energy Options for a Utility System  

Science Journals Connector (OSTI)

In this paper renewable energies have been re?addressed with respect to the potentials and feasibility of being incorporated in process industries. Within a process utility system is considered to be the most appropriate place for using sustainable energies. For integrating the renewable energies the pinch analysis is applied as the main tool to provide opportunity for energy conservation. The results demonstrated that the power generation by the wind is the most cost effective and environmentally friendly option for energy conservation in comparison to the other sustainable resources. However the tidal energy stands the least due to the long payback period. Also a computer program has been developed using MATLAB 7.3 to screen out different scenarios and perform economic study. The outcome data showed that there are several different opportunities for the integration of alternative energies. Finally this method has been applied to a case study and various retrofit projects have been identified each of which has certain amount of CO 2 reduction and estimated values for the required investment saving potential and payback period.

Lena Ahmadi; M. Hassan Panjeshahi; Simon Perry

2009-01-01T23:59:59.000Z

391

Evaluation of passive solar retrofit options  

SciTech Connect (OSTI)

An evaluation framework has been developed which allows for the assessment of the role of passive solar retrofit in the nationwide reduction of conventional fuel use. Three types of analysis are proposed within this framework: the physical/technical capability of the present housing stock to incorporate passive solar retrofit; the economic feasibility of the application of retrofit designs; and the actual market potential or acceptance of these alternative retrofit options. Each type of analysis has specific data requirements and a series of evaluation procedures to help establish estimates of the potential for passive solar retrofit in the present housing stock. The data requirements with their respective sources and evaluation procedures for the first two types of analysis-physical/technical setting and economic feasibility, are examined. A distinction is drawn between community specific case studies and more generalized national assessments. Information derived from these three types of analysis, whether case specific or national in scope, can then be used in an evaluation of potential economic impacts. The establishment of regional economic benefits and costs werve as a measure of the merit or attractiveness of the implementation of a passive solar retrofit program.

Ben-David, S.; Kirchemen, C.; Martin, S.; Noll, S.; Roach, F.

1980-01-01T23:59:59.000Z

392

Anisotropic Investigation of Hard X-ray Emission with Flat Anode Tips in APF Plasma Focus Device  

Science Journals Connector (OSTI)

In this paper behavior of hard X-ray (HXR) anisotropy and its intensity along the anode bar from APF plasma focus facility (16kV, 36?f, and...

M. Habibi; R. Amrollahi

2010-04-01T23:59:59.000Z

393

Mandatory Utility Green Power Option | Open Energy Information  

Open Energy Info (EERE)

Mandatory Utility Green Power Option Mandatory Utility Green Power Option Jump to: navigation, search Several states require certain electric utilities to offer customers the option of buying electricity generated from renewable resources, commonly known as “green power.” Typically, utilities offer green power generated using renewable resources that the utilities own (or for which they contract), or they buy renewable energy credits (RECs) from a renewable energy provider certified by a state public utilities commission [1] Mandatory Utility Green Power Option Incentives CSV (rows 1 - 17) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active DEMEC - Green Power Program (Delaware) Mandatory Utility Green Power Option Delaware Municipal Utility Solar Water Heat

394

Mandatory Utility Green Power Option | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mandatory Utility Green Power Option Mandatory Utility Green Power Option Mandatory Utility Green Power Option < Back Eligibility Investor-Owned Utility Municipal Utility Rural Electric Cooperative Savings Category Bioenergy Buying & Making Electricity Water Solar Wind Program Info State District of Columbia Program Type Mandatory Utility Green Power Option Provider Washington State Department of Commerce In May 2001, Washington enacted legislation (EHB 2247) that requires all electric utilities serving more than 25,000 customers to offer customers the option of purchasing renewable energy. Eligible renewables include wind, solar, geothermal, landfill gas, wave or tidal action, wastewater treatment gas, certain biomass resources, and "qualified hydropower" that is fish-friendly. Beginning January 1, 2002, each electric utility must inform its customers

395

Mandatory Green Power Option for Large Municipal Utilities | Department of  

Broader source: Energy.gov (indexed) [DOE]

Green Power Option for Large Municipal Utilities Green Power Option for Large Municipal Utilities Mandatory Green Power Option for Large Municipal Utilities < Back Eligibility Municipal Utility Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Colorado Program Type Mandatory Utility Green Power Option Provider Colorado Public Utilities Commission Municipal electric utilities serving more than 40,000 customers in Colorado must offer an optional green-power program that allows retail customers the choice of supporting emerging renewable technologies. This policy complements Colorado's renewable portfolio standard (RPS), which requires municipal utilities serving more than 40,000 customers to use renewable energy and energy recycling to account for 10% of retail sales by 2020.

396

Mandatory Utility Green Power Option | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mandatory Utility Green Power Option Mandatory Utility Green Power Option Mandatory Utility Green Power Option < Back Eligibility Utility Savings Category Bioenergy Water Buying & Making Electricity Solar Wind Program Info State Iowa Program Type Mandatory Utility Green Power Option Provider Iowa Utilities Board All electric utilities operating in Iowa, including those not rate-regulated by the Iowa Utilities Board (IUB), are required to offer green power options to their customers. These programs allow customers to make voluntary contributions to support the development of renewable energy sources in Iowa. Utilities must file their program plans and tariff schedules with the IUB; however, the filings for non-rate-regulated utilities are intended to be for informational purposes only. This policy

397

Homebuyer Solar Option and Solar Offset Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Homebuyer Solar Option and Solar Offset Program Homebuyer Solar Option and Solar Offset Program Homebuyer Solar Option and Solar Offset Program < Back Eligibility Residential Savings Category Solar Buying & Making Electricity Program Info State California Program Type Building Energy Code Provider California Energy Commission [http://www.energy.ca.gov/2009-SOPR-1/documents/sb_1_bill_20060821_chapte... Senate Bill 1 of 2006], which established the statewide California Solar Initiative, also required the California Energy Commission (CEC) to implement regulations that require sellers of production homes to offer a solar energy system option to all prospective homebuyers. Besides offering solar as an option to prospective homebuyers, sellers of homes constructed on land for which an application for a tentative subdivision map has been

398

Using Backup Generators: Alternative Backup Power Options | Department of  

Broader source: Energy.gov (indexed) [DOE]

Alternative Backup Power Options Alternative Backup Power Options Using Backup Generators: Alternative Backup Power Options Using Backup Generators: Alternative Backup Power Options In addition to electric generators powered by fuel, homeowners and business owners may consider alternative backup power options. Battery-stored backup power-Allows you to continue operating lights, refrigerators and other appliances, fans, and communications during a power outage. These systems can connect to renewable sources of energy, like solar panels and small-scale wind generators, to help the batteries stay charged during an emergency. You can also recharge many of these battery systems with diesel generators. The length of time you will be able to draw electricity from your batteries will depend on the size of your

399

Mandatory Utility Green Power Option | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mandatory Utility Green Power Option Mandatory Utility Green Power Option Mandatory Utility Green Power Option < Back Eligibility Investor-Owned Utility Municipal Utility Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Energy Sources Solar Wind Program Info State Maine Program Type Mandatory Utility Green Power Option Provider Maine Public Utilities Commission Legislation enacted in 2009 directed the Maine Public Utilities Commission (PUC) to develop a program offering green power as an option to residential and small commercial customers in the state. The PUC issued rules in October 2010 and issued an RFP. The PUC selected a company, 3 Degrees, to manage the statewide green power program for Maine's transmission and distribution territories. The program includes community-based renewable

400

Pilot Application to Nuclear Fuel Cycle Options | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pilot Application to Nuclear Fuel Cycle Options Pilot Application to Nuclear Fuel Cycle Options Pilot Application to Nuclear Fuel Cycle Options A Screening Method for Guiding R&D Decisions: Pilot Application to Screen Nuclear Fuel Cycle Options The Department of Energy's Office of Nuclear Energy (DOE-NE) invests in research and development (R&D) to ensure that the United States will maintain its domestic nuclear energy capability and scientific and technical leadership in the international community of nuclear power nations in the years ahead. The 2010 Nuclear Energy Research and Development Roadmap presents a high-level vision and framework for R&D activities that are needed to keep the nuclear energy option viable in the near term and to expand its use in the decades ahead. The roadmap identifies the development

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Memorandum, Protective Force Career Options Committee - July 23, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Memorandum, Protective Force Career Options Committee - July 23, Memorandum, Protective Force Career Options Committee - July 23, 2009 Memorandum, Protective Force Career Options Committee - July 23, 2009 On March 31,2009, this office commissioned a study to examine career opportunities and retirement options for the Department of Energy (DOE) protective force members. On March 3 1,2009, this office commissioned a study to examine career opportunities and retirement options for the Department of Energy (DOE) protective force members. The study was supported by senior leaders of the Department as well as by the leadership of the National Council of Security Police (NCSP), who took an active role in the study. The results of the study were briefed to several senior Departmental officials on June 30,2009. These leaders accepted the overall thrust of

402

Memorandum, Enhanced Career Longevity and Retirement Options - June 30,  

Broader source: Energy.gov (indexed) [DOE]

Memorandum, Enhanced Career Longevity and Retirement Options - June Memorandum, Enhanced Career Longevity and Retirement Options - June 30, 2009 Memorandum, Enhanced Career Longevity and Retirement Options - June 30, 2009 June 30, 2009 On March 31, 2009 , the Department of Energy (DOE) Chief Health, Safety and Security Officxer commissioned a study to examine "realistic and reasponable options for improving the career opportunities and retirement prospects of protective force members while maintaining, within current and anticipated budgetary constraints, a robust and effective security posture. On March 31, 2009, the Department of Energy (DOE) Chief Health, Safety and Security Officxer commissioned a study to examine "realistic and reasponable options for improving the career opportunities and retirement prospects of protective force members while maintaining, within current and

403

Expanding Options for Nuclear Power | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Expanding Options for Nuclear Power Expanding Options for Nuclear Power Expanding Options for Nuclear Power April 15, 2013 - 10:12am Addthis The development of clean, affordable nuclear power options is a key element of the Energy Department's Nuclear Energy Research and Development Roadmap. As a part of this strategy, a high priority of the Department has been to help accelerate the timelines for the commercialization and deployment of small modular reactor (SMR) technologies through the SMR Licensing Technical Support program. | Photo by the Energy Department. The development of clean, affordable nuclear power options is a key element of the Energy Department's Nuclear Energy Research and Development Roadmap. As a part of this strategy, a high priority of the Department has been to

404

Memorandum, Enhanced Career Longevity and Retirement Options - June 30,  

Broader source: Energy.gov (indexed) [DOE]

Memorandum, Enhanced Career Longevity and Retirement Options - June Memorandum, Enhanced Career Longevity and Retirement Options - June 30, 2009 Memorandum, Enhanced Career Longevity and Retirement Options - June 30, 2009 June 30, 2009 On March 31, 2009 , the Department of Energy (DOE) Chief Health, Safety and Security Officxer commissioned a study to examine "realistic and reasponable options for improving the career opportunities and retirement prospects of protective force members while maintaining, within current and anticipated budgetary constraints, a robust and effective security posture. On March 31, 2009, the Department of Energy (DOE) Chief Health, Safety and Security Officxer commissioned a study to examine "realistic and reasponable options for improving the career opportunities and retirement prospects of protective force members while maintaining, within current and

405

Gunshot triangulation device testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gunshot triangulation device testing Gunshot triangulation device testing Report to the Fermilab Community Advisory Board, Oct. 28, 2010 The Fermilab security director outlined for the board last month a recurring problem of people shooting guns near the edges of the laboratory and bullets coming onto the site. Fermilab is installing a system to triangulate the gunshots to improve police response time. This will require a set-up calibration of two dozen gunshots during a total of 6 minutes at the laboratory site. The board was asked for recommendations about how and whom to inform of the test firing. In response to the board discussion, Fermilab plans to take the following actions:  The test firing will occur during the mid-day of a week day to minimize the number of residents

406

Dielectrokinetic chromatography devices  

DOE Patents [OSTI]

Disclosed herein are methods and devices for dielectrokinetic chromatography. As disclosed, the devices comprise microchannels having at least one perturber which produces a non-uniformity in a field spanning the width of the microchannel. The interaction of the field non-uniformity with a perturber produces a secondary flow which competes with a primary flow. By decreasing the size of the perturber the secondary flow becomes significant for particles/analytes in the nanometer-size range. Depending on the nature of a particle/analyte present in the fluid and its interaction with the primary flow and the secondary flow, the analyte may be retained or redirected. The composition of the primary flow can be varied to affect the magnitude of primary and/or secondary flows on the particles/analytes and thereby separate and concentrate it from other particles/analytes.

Chirica, Gabriela S; Fiechtner, Gregory J; Singh, Anup K

2014-12-16T23:59:59.000Z

407

Light modulating device  

DOE Patents [OSTI]

In a device for transmitting light, means for controlling the transmissivity of the device, including a ceramic, reversibly electrochromic, crystalline element having a highly reflective state when injected with electrons and charge compensating ions and a highly transmissive state when the electrons and ions are removed, the crystalline element being characterized as having a reflectivity of at least 50% in the reflective state and not greater than 10% in the transmissive state, and means for modulating the crystalline element between the reflective and transmissive states by injecting ions into the crystalline element in response to an applied electrical current of a first polarity and removing the ions in response to an applied electrical current of a second polarity.

Rauh, R. David (Newton, MA); Goldner, Ronald B. (Lexington, MA)

1989-01-01T23:59:59.000Z

408

Light modulating device  

DOE Patents [OSTI]

In a device for transmitting light, means for controlling the transmissivity of the device, including a ceramic, reversibly electrochromic, crystalline element having a highly reflective state when injected with electrons and charge compensating ions and a highly transmissive state when the electrons and ions are removed, the crystalline element being characterized as having a reflectivity of at least 50% in the reflective state and not greater than 10% in the transmissive state, and means for modulating the crystalline element between the reflective and transmissive states by injecting ions into the crystalline element in response to an applied electrical current of a first polarity and removing the ions in response to an applied electrical current of a second polarity are disclosed. 1 fig.

Rauh, R.D.; Goldner, R.B.

1989-12-26T23:59:59.000Z

409

Support and maneuvering device  

DOE Patents [OSTI]

A support and maneuvering device includes an elongated flexible inflatable enclosure having a fixed end and a movable end. The movable end is collapsible toward the fixed end to a contracted position when the enclosure is in a noninflated condition. Upon inflation, the movable end is movable away from the fixed end to an extended position. The movable end includes means for mounting an article such as a solar reflector thereon. The device also includes a plurality of position controlling means disposed about the movable end to effect adjusting movement of portions thereof by predetermined amounts and for controlling an angle at which the article disposed at the movable end is oriented. The plurality of position controlling means limits a suitable number degrees of freedom of the movable end for transmitting a steering motion thereto and for controlling the position thereof. 9 figs.

Wood, R.L.

1987-03-23T23:59:59.000Z

410

Wire brush fastening device  

DOE Patents [OSTI]

A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

Meigs, R.A.

1995-09-19T23:59:59.000Z

411

Support and maneuvering device  

DOE Patents [OSTI]

A support and maneuvering device includes an elongated flexible inflatable enclosure having a fixed end and a movable end. The movable end is collapsible toward the fixed end to a contracted position when the enclosure is in a noninflated condition. Upon inflation, the movable end is movable away from the fixed end to an extended position. The movable end includes means for mounting an article such as a solar reflector thereon. The device also includes a plurality of position controlling means disposed about the movable end to effect adjusting movement of portions thereof by predetermined amounts and for controlling an angle at which the article disposed at the movable end is oriented. The plurality of position controlling means limits a suitable number degrees of freedom of the movable end for transmitting a steering motion thereto and for controlling the position thereof.

Wood, Richard L. (Arvada, CO)

1988-01-01T23:59:59.000Z

412

Residual gas analysis device  

DOE Patents [OSTI]

A system is provided for testing the hermeticity of a package, such as a microelectromechanical systems package containing a sealed gas volume, with a sampling device that has the capability to isolate the package and breach the gas seal connected to a pulse valve that can controllably transmit small volumes down to 2 nanoliters to a gas chamber for analysis using gas chromatography/mass spectroscopy diagnostics.

Thornberg, Steven M. (Peralta, NM)

2012-07-31T23:59:59.000Z

413

File:Whiskey flats 100k.pdf | Open Energy Information  

Open Energy Info (EERE)

flats 100k.pdf flats 100k.pdf Jump to: navigation, search File File history File usage Metadata File:Whiskey flats 100k.pdf Size of this preview: 388 × 600 pixels. Full resolution ‎(1,650 × 2,550 pixels, file size: 375 KB, MIME type: application/pdf) Geothermal Sale Parcels Whiskey Flat File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 20:39, 7 October 2013 Thumbnail for version as of 20:39, 7 October 2013 1,650 × 2,550 (375 KB) Kyoung (Talk | contribs) Geothermal Sale Parcels Whiskey Flat You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: Whiskey Flats Geothermal Area

414

Master's Degree in Agriculture Plant Health Management Option Option Title: Master of Science (MS) in Agriculture: Plant Health  

E-Print Network [OSTI]

Master's Degree in Agriculture ­ Plant Health Management Option Option Title: Master of Science (MS) in Agriculture: Plant Health Management Department(s) or Program(s): Supported of Agricultural, Human, and Natural Resource Sciences (CAHNRS) Contact Name: Dr. Kim Kidwell, Director MS

Collins, Gary S.

415

Grant funding Mechanism Review Options for consultation In the Options set out below, it has been assumed that  

E-Print Network [OSTI]

1 Grant funding Mechanism Review ­ Options for consultation In the Options set out below grants In this model, all exploitation activity (including project maintenance and operations (M&O) for particle physics projects) would be funded via 3year (maximum) standard grants. The detailed model would

Crowther, Paul

416

Enforcement Letter -Rocky Flats-08/02/2000  

Broader source: Energy.gov (indexed) [DOE]

, 2000 , 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to the Department of Energy's (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure to perform required combustible gas surveillances. The failure to fully perform the required surveillances was identified by the contractor during a comprehensive Kaiser-Hill (KHLL) Implementation Validation Review (IVR) team verifying implementation of the Basis of Interim Operation (BIO) for Buildings 776 and

417

Enforcement Letter - Rocky Flats -07/20/1998  

Broader source: Energy.gov (indexed) [DOE]

, 1998 , 1998 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 Subject: Enforcement Letter Noncompliance Reports NTS-RFO--KHLL-SITEWIDE-1997-0006 NTS-RFO--KHLL-371OPS-1997-0002 NTS-RFO--KHLL-SITEWIDE-1997-0010 NTS-RFO--KHLL-SITEWIDE-1998-0001 Dear Mr. Card: This letter refers to the Department of Energy=s (DOE) evaluation of noncompliances reported in four Noncompliance Tracking System (NTS) entries, identified in the subject line above. The four NTS reports were submitted between September 24, 1997, and March 3, 1998. The reports identified potential noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) and 10 CFR 835 (Radiation Protection Rule). The Office of Enforcement and Investigation evaluated these NTS reports based on the

418

DOE - Office of Legacy Management -- Rocky Flats Petition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Petition Petition Rocky Flats Site, Colorado Site-Specific Uranium Standards Petition All documents are Adobe Acrobat files. pdf_icon U.S. Department of Energy's Proponent's Pre-Hearing Statement for Proposed Revisions to Segments 4a, 4b, and 5 of Big Dry Creek (Walnut and Woman Creeks) Regulation #38 (5 CCR 1002-38) Figure 1 Figure 2 Thermal Ionization Mass Spectrometry Uranium Results for November 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for September 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for October 2007 RFETS Waters Quantitative Evaluation of Mixture Components in RFETS Uranium Isotopic Analyses Proposed Notice Petition for Rulemaking Regarding Site-Specific Uranium Standards Rulemaking Petition Water Monitoring Locations

419

System Advisor Model: Flat Plate Photovoltaic Performance Modeling Validation Report  

SciTech Connect (OSTI)

The System Advisor Model (SAM) is a free software tool that performs detailed analysis of both system performance and system financing for a variety of renewable energy technologies. This report provides detailed validation of the SAM flat plate photovoltaic performance model by comparing SAM-modeled PV system generation data to actual measured production data for nine PV systems ranging from 75 kW to greater than 25 MW in size. The results show strong agreement between SAM predictions and field data, with annualized prediction error below 3% for all fixed tilt cases and below 8% for all one axis tracked cases. The analysis concludes that snow cover and system outages are the primary sources of disagreement, and other deviations resulting from seasonal biases in the irradiation models and one axis tracking issues are discussed in detail.

Freeman, J.; Whitmore, J.; Kaffine, L.; Blair, N.; Dobos, A. P.

2013-12-01T23:59:59.000Z

420

Sitewide risk perspectives for the Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

The US Department of Energy (DOE) has recently finalized a closure plan (originally called the Ten Year Plan) for closure and environmental cleanup of previous nuclear weapons facilities. The DOE Rocky Flats Field Office has established priorities for risk reduction work to Support closure activities, as well as addressing those hazards associated with storage and management of radioactive materials and hazardous chemicals. To provide information for future National Environmental Policy Act (NEPA) or other regulatory assessments of specific risk reduction projects identified in the Closure Plan, a risk assessment of normal operations and potential accidents was recently prepared to provide an updated baseline of the cumulative impacts to the worker, public and environment due to the Site`s operations, activities, and environmental conditions in light of the Site`s change in mission, and of future closure projects. This paper summarizes the risk assessment approach, results, and conclusions.

Olinger, S.J. [Dept. of Energy, Golden, CO (United States). Rocky Flats Field Office; Foppe, T.L. [M.H. Chew and Associates, Inc., Golden, CO (United States)

1998-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Analysis of offsite Emergency Planning Zones for Rocky Flats Plant  

SciTech Connect (OSTI)

The purpose of this quality assurance program was to ensure the quality and technical adequacy of Phase 2 of the Analysis of Offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant project. Quality assurance was accomplished by managing and controlling the processes in the development of the product. The quality assurance task team conducted audits, reviews, and surveillances of project and related activities. This process contributed to identifying areas where the quality assurance plan was not fully implemented, areas needing improvement, and/or corrective actions resulting in a improved product. During the reviews and audits, several key areas were identified where quality assurance plan implementation needed to be improved. These areas included maintaining adequate documentation, reviewing technical results, making inputs traceable to technical results, and understanding that all personnel are responsible for quality.

Inger, J.R. (TENERA, L.P., Knoxville, TN (United States)); Brown-Strattan, M.A. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant)

1991-01-01T23:59:59.000Z

422

Criticality safety management during the new mission at Rocky Flats  

SciTech Connect (OSTI)

Under the cleanup and waste management missions at the former United States Department of Energy (DOE) production sites, a redirection of nuclear criticality safety programs has to take place to accommodate new objectives and reduced resources. The Rocky Flats Environmental Technology Site (RFETS) provides innovative approaches to respond to the needs of its new mission. The paper provides some background on the changes in the DOE complex and expands on the steps undertaken at RFETS with the hope that some of the novel approaches could be of use at other facilities. With the demise of the Cold War, the United States Department of Energy weapons complex has transitioned from the production of nuclear material to the disposition of weapons and cleanup of former production sites. Fissionable material in stored waste, contaminated facilities and equipment, and left over inventories presents nuclear criticality safety challenges that requires careful management.

Toffer, H.; Wilson, R.E. [Safe Sites of Colorado, Golden, CO (United States)

1996-12-31T23:59:59.000Z

423

Property:FlatDemandStructure | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:FlatDemandStructure Jump to: navigation, search This is a property of type Page. Pages using the property "FlatDemandStructure" Showing 25 pages using this property. (previous 25) (next 25) 0 0000827d-84d0-453d-b659-b86869323897 + 0000827d-84d0-453d-b659-b86869323897 + 000e60f7-120d-48ab-a1f9-9c195329c628 + 000e60f7-120d-48ab-a1f9-9c195329c628 + 00101108-073b-4503-9cd4-01769611c26f + 00101108-073b-4503-9cd4-01769611c26f + 001361ca-50d2-49bc-b331-08755a2c7c7d + 001361ca-50d2-49bc-b331-08755a2c7c7d + 0016f771-cda9-4312-afc2-63f10c8d8bf5 + 0016f771-cda9-4312-afc2-63f10c8d8bf5 + 00178d3d-17cb-46ed-8a58-24c816ddce96 + 00178d3d-17cb-46ed-8a58-24c816ddce96 + 001d1952-955c-411b-8ce4-3d146852a75e + 001d1952-955c-411b-8ce4-3d146852a75e +

424

Near-field modeling in Frenchman Flat, Nevada Test Site  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is investigating the effects of nuclear testing in underground test areas (the UGTA program) at the Nevada Test Site. The principal focus of the UGTA program is to better understand and define subsurface radionuclide migration. The study described in this report focuses on the development of tools for generating maps of hydrogeologic characteristics of subsurface Tertiary volcanic units at the Frenchman Flat corrective Action Unit (CAU). The process includes three steps. The first step involves generation of three-dimensional maps of the geologic structure of subsurface volcanic units using geophysical logs to distinguish between two classes: densely welded tuff and nonwelded tuff. The second step generates three-dimensional maps of hydraulic conductivity utilizing the spatial distribution of the two geologic classes obtained in the first step. Each class is described by a correlation structure based on existing data on hydraulic conductivity, and conditioned on the generated spatial location of each class. The final step demonstrates the use of the maps of hydraulic conductivity for modeling groundwater flow and radionuclide transport in volcanic tuffs from an underground nuclear test at the Frenchman Flat CAU. The results indicate that the majority of groundwater flow through the volcanic section occurs through zones of densely welded tuff where connected fractures provide the transport pathway. Migration rates range between near zero to approximately four m/yr, with a mean rate of 0.68 m/yr. This report presents the results of work under the FY96 Near-Field Modeling task of the UGTA program.

Pohlmann, K.; Shirley, C.; Andricevic, R.

1996-12-01T23:59:59.000Z

425

Nightmares with Mobile Devices Are Just Around the Corner!  

SciTech Connect (OSTI)

Mobile Devices (MDs) such as Personal Digital Assistants (PDAs), smart phones, handheld personal computers, and Tablet PCs, are proliferating in the marketplace. Cheap and ubiquitous mobile computing devices represent computings fifth wave [1], bringing about new opportunities in the marketplace. As MDs become more powerful and commonplace with ubiquitous connectivity, the line that currently divides these handheld devices from typical network computers will become very unclear. Mobile devices have become integrated into the business processes of both government and commercial institutions. MDs are small, portable, and able to store large amounts of information. The breadth of communication options (infrared, wireless, docking station) for MDs introduces many security risks. Some of the problems associated with MDs are: easy to loose, misplace, or have stolen, potential loss/comprise of company data (user ids, passwords, contacts, sensitive documentation, credit card numbers), increases the opportunity for a backdoor into an enterprises network, lack of authentication and limited logging capability. The use of these devices poses a risk to the security of an organization.

Kurt Derr

2007-03-01T23:59:59.000Z

426

Energy Management on Handheld Devices  

Science Journals Connector (OSTI)

Handheld devices are becoming ubiquitous and as their capabilities increase, they are starting to displace laptop computers - much as laptop computers have displaced desktop computers in many roles. Handheld devices are evolving from today's PDAs, organizers, ...

Marc A Viredaz; Lawrence S Brakmo; William R Hamburgen

2003-10-01T23:59:59.000Z

427

Hydraulic model analysis of water distribution system, Rockwell International, Rocky Flats, Colorado  

SciTech Connect (OSTI)

Rockwell International requested an analysis of the existing plant site water supply distribution system at Rocky Flats, Colorado, to determine its adequacy. On September 26--29, 1988, Hughes Associates, Inc., Fire Protection Engineers, accompanied by Rocky Flats Fire Department engineers and suppression personnel, conducted water flow tests at the Rocky Flats plant site. Thirty-seven flows from various points throughout the plant site were taken on the existing domestic supply/fire main installation to assure comprehensive and thorough representation of the Rocky Flats water distribution system capability. The analysis was completed in four phases which are described, together with a summary of general conclusions and recommendations.

Perstein, J.; Castellano, J.A. [Hughes Associates, Inc., Wheaton, MD (United States)

1989-01-20T23:59:59.000Z

428

The effect of a small creek valley on drainage flows in the Rocky Flats region  

SciTech Connect (OSTI)

Regional scale circulation and mountain-plain interactions and effects on boundary layer development are important for understanding the fate of an atmospheric release from Rocky Flats, Colorado. Numerical modeling of Front Range topographic effects near Rocky Flats have shown that though the Front Range dominates large scale flow features, small-scale terrain features near Rocky Flats are important to local transport during nighttime drainage flow conditions. Rocky Flats has been the focus of interest for the Department of Energy`s Atmospheric Studies in Complex Terrain (ASCOT) program.

Porch, W. [Los Alamos National Lab., NM (United States)

1996-12-31T23:59:59.000Z

429

Rockwell International's Nuclear Criticality Safety Program at the Rocky Flats Plant  

SciTech Connect (OSTI)

This paper describes the criticality safety program at the Rocky Flats Plant. The groups responsible for safety are named and their functions outlined. (JDH)

McCarthy, J.D.

1987-01-01T23:59:59.000Z

430

E-Print Network 3.0 - amorphous selenium flat-panel Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

films with near-single-crystalline quality and high carrier mobility Summary: , such as solar cells and flat-panel displays, our ACSi technology promises to fundamentally...

431

E-Print Network 3.0 - amorphous silicon flat-panel Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with the low cost of amorphous and polycrystalline silicon films on non... , such as solar cells and flat-panel displays, our ACSi technology promises to fundamentally...

432

Enhancing Staging Capabilities at the Device Assembly Facility  

SciTech Connect (OSTI)

The radioactive material limits allowed by the Documented Safety Analysis (DSA) at the Nevada National Security Site (NNSS) Device Assembly Facility (DAF) can support larger quantities than the floor space will accommodate. In order to maximize the full staging bunker capability, National Security Technologies, LLC, (NSTec) is developing a plan to take advantage of these high inventory limits and evaluate staging options such as shelves, racks, and mezzanines. This plan will investigate cost and evaluate U.S. Department of Energy (DOE) complex-wide alternatives used at other sites (Highly Enriched Uranium Manufacturing Facility, Pantex, Los Alamos National Laboratory, Sandia National Laboratories, etc.) that addressed similar situations.

Kanning, R. A.; Long, R. G.; Garcia, B. O.; Williams, V. D.

2013-06-08T23:59:59.000Z

433

Convective Heat Transfer from Exposed Flat Horizontal Surface in Outdoorconditions at Low Wind Speeds: An Application to Flat Plate Solar Collector  

Science Journals Connector (OSTI)

Estimation of various heat losses in flat plate solar collectors is important for their thermal performance evaluation under different operating conditions. Upward heat losses have a major contribution in the ...

Suresh Kumar; S. C. Mullick

2009-01-01T23:59:59.000Z

434

Local Option - Green Building Incentives | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Green Building Incentives Local Option - Green Building Incentives Local Option - Green Building Incentives < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Water Heating Wind Program Info Start Date 6/11/2009 State North Carolina Program Type Green Building Incentive To encourage sustainable building practices, North Carolina law allows all counties and cities to provide reductions or partial rebates for building permit fees. To qualify for a fee reduction, buildings must meet guidelines established by the Leadership in Energy and Environmental Design (LEED)

435

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

436

Decoupling Policies: Options to Encourage Energy Efficiency Policies for  

Broader source: Energy.gov (indexed) [DOE]

Decoupling Policies: Options to Encourage Energy Efficiency Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL) (Brochure) Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL) (Brochure) This document discusses the policy of decoupling in utilities and how it can be used to encourage energy efficiency. 46606.pdf More Documents & Publications Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009 (Brochure) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure) Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse

437

Cost of Renewable Energy Technology Options | Open Energy Information  

Open Energy Info (EERE)

Cost of Renewable Energy Technology Options Cost of Renewable Energy Technology Options Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Cost of Renewable Energy Technology Options Focus Area: Solar Topics: Opportunity Assessment & Screening Website: www1.eere.energy.gov/tribalenergy/guide/renewable_technologies_costs.h Equivalent URI: cleanenergysolutions.org/content/cost-renewable-energy-technology-opti Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration & Implementation This resource has been extracted and reformatted from the U.S. National Renewable Energy Laboratory's Power Technologies Energy Data Book. The data book is an excellent source of consistent information on renewable energy technology status and future expectations. Cost information is available

438

Announcement Notice Options By STI Type | Scientific and Technical  

Office of Scientific and Technical Information (OSTI)

Notices Notices Announcement Notice Options By STI Type Print page Print page Email page Email page The following list provides basic information regarding which announcement notice should be used by which audience for the various types of STI. For more information, see Submittal Basics. Announcement Options STI Product Types Announcement Notice Audiences AN 241.1 Web Version AN 241.1 Transmission Option Books/Monographs (non-copyrighted) Books/Monographs (copyrighted) Conference Papers/Presentations/Proceedings (non-copyrighted Conference Papers/Presentations/Proceedings (copyrighted) Journal Article Reprints (announcement notice only with adequate information to enable linking via Digital Object Identifier (DOI)) Journal Articles - Accepted manuscript Patents Program Documents

439

Local Option - Sustainable Energy Financing Districts | Department of  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Sustainable Energy Financing Districts Local Option - Sustainable Energy Financing Districts Local Option - Sustainable Energy Financing Districts < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Other Design & Remodeling Windows, Doors, & Skylights Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Bioenergy Solar Buying & Making Electricity Energy Sources Water Heating Wind Program Info Start Date 8/15/2009 State Louisiana Program Type PACE Financing '''''Note: The Federal Housing Financing Agency (FHFA) issued a [http://www.fhfa.gov/webfiles/15884/PACESTMT7610.pdf statement] in July 2010 concerning the senior lien status associated with most PACE programs.

440

Local Option - Commercial PACE Financing (Connecticut) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Commercial PACE Financing (Connecticut) Local Option - Commercial PACE Financing (Connecticut) Local Option - Commercial PACE Financing (Connecticut) < Back Eligibility Commercial Industrial Low-Income Residential Multi-Family Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Construction Design & Remodeling Other Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Insulation Windows, Doors, & Skylights Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Energy Sources Buying & Making Electricity Solar Water Water Heating Wind Program Info Start Date 10/2012 State Connecticut Program Type PACE Financing Provider Clean Energy Finance and Investment Authority

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Local Option - Commercial PACE Financing (Utah) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Commercial PACE Financing (Utah) Local Option - Commercial PACE Financing (Utah) Local Option - Commercial PACE Financing (Utah) < Back Eligibility Commercial Fed. Government Industrial Local Government Multi-Family Residential Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Other Design & Remodeling Windows, Doors, & Skylights Construction Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Solar Buying & Making Electricity Energy Sources Water Water Heating Wind Program Info State Utah Program Type PACE Financing Provider Office of Energy Development Senate Bill 221 of 2013 authorizes local governments to adopt Commercial* Property Assessed Clean Energy (C-PACE) financing programs. C-PACE allows

442

ESMAP-Indonesia-Low Carbon Development Options Study | Open Energy  

Open Energy Info (EERE)

Low Carbon Development Options Study Low Carbon Development Options Study Jump to: navigation, search Name Indonesia-ESMAP Low Carbon Country Studies Program Agency/Company /Organization Energy Sector Management Assistance Program of the World Bank Partner United Kingdom Department for International Development Sector Energy, Land Focus Area Energy Efficiency, Forestry Topics Background analysis, GHG inventory, Low emission development planning, Market analysis, Policies/deployment programs Website http://www-wds.worldbank.org/e Country Indonesia South-Eastern Asia References World Bank, ESMAP - Low Carbon Growth Country Studies - Getting Started[1] Overview "The Indonesia's study aimed to evaluate and develop strategic options to mitigate climate change without compromising the country's development

443

Local Option - Improvement Districts for Energy Efficiency and Renewable  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Improvement Districts for Energy Efficiency and Local Option - Improvement Districts for Energy Efficiency and Renewable Energy Improvements Local Option - Improvement Districts for Energy Efficiency and Renewable Energy Improvements < Back Eligibility Agricultural Commercial Industrial Institutional Low-Income Residential Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Design & Remodeling Windows, Doors, & Skylights Construction Heat Pumps Heating Appliances & Electronics Commercial Lighting Lighting Biofuels Alternative Fuel Vehicles Bioenergy Solar Hydrogen & Fuel Cells Buying & Making Electricity Water Water Heating Wind Program Info State Colorado Program Type PACE Financing

444

Nanotube resonator devices  

DOE Patents [OSTI]

A fully-functional radio receiver fabricated from a single nanotube is being disclosed. Simultaneously, a single nanotube can perform the functions of all major components of a radio: antenna, tunable band-pass filter, amplifier, and demodulator. A DC voltage source, as supplied by a battery, can power the radio. Using carrier waves in the commercially relevant 40-400 MHz range and both frequency and amplitude modulation techniques, successful music and voice reception has been demonstrated. Also disclosed are a radio transmitter and a mass sensor using a nanotube resonator device.

Jensen, Kenneth J; Zettl, Alexander K; Weldon, Jeffrey A

2014-05-06T23:59:59.000Z

445

Radiography Device | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Radiography Device Radiography Device Radiography Device This scenario provides the planning instructions, guidance, and evaluation forms necessary to conduct an exercise involving a highway shipment of a radiography device (Class 7 - Radioactive). This exercise manual is one in a series of five scenarios developed by the Department of Energy Transportation Emergency Preparedness Program. Responding agencies may include several or more of the following: local municipal and county fire, police, sheriff, and Emergency Medical Services (EMS) personnel; state, local, and federal emergency response teams; emergency response contractors; and other emergency response resources that could potentially be provided by the carrier and the originating facility (shipper). Radiography Device.docx

446

Gold-based electrical interconnections for microelectronic devices  

DOE Patents [OSTI]

A method of making an electrical interconnection from a microelectronic device to a package, comprising ball or wedge compression bonding a gold-based conductor directly to a silicon surface, such as a polysilicon bonding pad in a MEMS or IMEMS device, without using layers of aluminum or titanium disposed in-between the conductor and the silicon surface. After compression bonding, optional heating of the bond above 363 C. allows formation of a liquid gold-silicon eutectic phase containing approximately 3% (by weight) silicon, which significantly improves the bond strength by reforming and enhancing the initial compression bond. The same process can be used for improving the bond strength of Au--Ge bonds by forming a liquid Au-12Ge eutectic phase.

Peterson, Kenneth A. (Albuquerque, NM); Garrett, Stephen E. (Albuquerque, NM); Reber, Cathleen A. (Corrales, NM); Watson, Robert D. (Tijeras, NM)

2002-01-01T23:59:59.000Z

447

Fluid flow monitoring device  

DOE Patents [OSTI]

A flow meter and temperature measuring device are described comprising a tube with a body centered therein for restricting flow and a sleeve at the upper end of the tube to carry several channels formed longitudinally in the sleeve to the appropriate axial location where they penetrate the tube to allow pressure measurements and temperature measurements with thermocouples. The high pressure measurement is made using a channel penetrating the tube away from the body and the low pressure measurement is made at a location at the widest part of the body. An end plug seals the end of the device and holes at its upper end allow fluid to pass from the interior of the tube into a plenum. The channels are made by cutting grooves in the sleeve, the grooves widened at the surface of the sleeve and then a strip of sleeve material is welded to the grooves closing the channels. Preferably the sleeve is packed with powdered graphite before cutting the grooves and welding the strips. 7 figures.

McKay, M.D.; Sweeney, C.E.; Spangler, B.S. Jr.

1993-11-30T23:59:59.000Z

448

Fluid flow monitoring device  

DOE Patents [OSTI]

A flow meter and temperature measuring device comprising a tube with a body centered therein for restricting flow and a sleeve at the upper end of the tube to carry several channels formed longitudinally in the sleeve to the appropriate axial location where they penetrate the tube to allow pressure measurements and temperature measurements with thermocouples. The high pressure measurement is made using a channel penetrating the tube away from the body and the low pressure measurement is made at a location at the widest part of the body. An end plug seals the end of the device and holes at its upper end allow fluid to pass from the interior of the tube into a plenum. The channels are made by cutting grooves in the sleeve, the grooves widened at the surface of the sleeve and then a strip of sleeve material is welded to the grooves closing the channels. Preferably the sleeve is packed with powdered graphite before cutting the grooves and welding the strips.

McKay, Mark D. (1426 Socastee Dr., North Augusta, SC 29841); Sweeney, Chad E. (3600 Westhampton Dr., Martinez, GA 30907-3036); Spangler, Jr., B. Samuel (2715 Margate Dr., Augusta, GA 30909)

1993-01-01T23:59:59.000Z

449

For Immediate Release --Wednesday, September 24, 2014 University of Lethbridge unveils three options for new  

E-Print Network [OSTI]

the design process. In developing the three options, an Integrated Design Planning of Lethbridge unveils three options for new Science and Academic Building, as three building massing options for the new Science and Academic Building were

Hossain, Shahadat

450

Realising REDD+: National Strategy and Policy Options | Open Energy  

Open Energy Info (EERE)

Realising REDD+: National Strategy and Policy Options Realising REDD+: National Strategy and Policy Options Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Realising REDD+: National Strategy and Policy Options Agency/Company /Organization: Center for International Forestry Research Sector: Land Focus Area: Forestry, Agriculture Topics: Implementation, Policies/deployment programs Resource Type: Publications Website: www.cifor.cgiar.org/publications/pdf_files/Books/BAngelsen0902.pdf References: Realising REDD+: National Strategy and Policy Options[1] "This book seeks to answer these questions by examining what REDD+ at the national level might look like in four areas: institutions and processes to build the REDD+ framework, broad policy reforms to enable REDD+ implementation, sectoral policies to change incentives, and demonstration

451

Local Option - Property Tax Exemption for Renewable Energy Systems |  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Property Tax Exemption for Renewable Energy Systems Local Option - Property Tax Exemption for Renewable Energy Systems Local Option - Property Tax Exemption for Renewable Energy Systems < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Bioenergy Solar Buying & Making Electricity Home Weatherization Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Rhode Island Program Type Property Tax Incentive Rebate Amount Varies (local option) Provider Rhode Island Office of Energy Resources Rhode Island allows cities and towns to exempt, by ordinance, renewable energy systems from property taxation. The term "renewable energy system" is not defined in the applicable statute (R.I. Gen. Laws § 44-3-21). Note that [http://dsireusa.org/incentives/incentive.cfm?Incentive_Code=RI02F&re=1&ee=1

452

Assessment of Biomass Pelletization Options for Greensburg, Kansas:  

Broader source: Energy.gov (indexed) [DOE]

Assessment of Biomass Pelletization Options for Greensburg, Kansas: Assessment of Biomass Pelletization Options for Greensburg, Kansas: Executive Summary Assessment of Biomass Pelletization Options for Greensburg, Kansas: Executive Summary This executive summary provides an overview of a technical report on an assessment NREL conducted in Greensburg, Kansas, to identify potential opportunities to develop a biomass pelletization or briquetting plant in the region. 45843.pdf More Documents & Publications Assessment of Biomass Pelletization Options for Greensburg, Kansas Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices

453

Energy for Sustainable Development: Policy Options for Africa | Open Energy  

Open Energy Info (EERE)

Energy for Sustainable Development: Policy Options for Africa Energy for Sustainable Development: Policy Options for Africa Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy for Sustainable Development: Policy Options for Africa Agency/Company /Organization: United Nations Economic Commission for Africa Sector: Energy Focus Area: Renewable Energy, Economic Development, Energy Efficiency Topics: Co-benefits assessment, - Energy Access, Policies/deployment programs Resource Type: Publications Website: www.uneca.org/eca_resources/publications/unea-publication-tocsd15.pdf References: Energy for Sustainable Development: Policy Options for Africa[1] Overview "Over the last four decades, the gap between energy supply and demand in Africa has been growing. Projections by experts in the field forecast that

454

Local Option Municipal Economic Development Act (Nebraska) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Local Option Municipal Economic Development Act (Nebraska) Local Option Municipal Economic Development Act (Nebraska) Local Option Municipal Economic Development Act (Nebraska) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Bond Program Grant Program Loan Program Provider Economic Development This act gives local governments the option to provide direct and indirect assistance to business enterprises in their communities, whether for expansion of existing operations, the creation of new businesses, or the provision of new services, by the use of funds raised by local taxation when the voters of the municipality decide it is in their best interest. The act gives local governments broad freedoms to determine the specifics

455

Feebates: A Legislative Option to Encourage Continuous Improvements to  

Open Energy Info (EERE)

Feebates: A Legislative Option to Encourage Continuous Improvements to Feebates: A Legislative Option to Encourage Continuous Improvements to Automobile Efficiency Jump to: navigation, search Tool Summary Name: Feebates: A Legislative Option to Encourage Continuous Improvements to Automobile Efficiency Agency/Company /Organization: Rocky Mountain Institute Focus Area: Standards - Incentives - Policies - Regulations Topics: Best Practices Website: www.rmi.org/Knowledge-Center/Library/T08-09_FeebatesLegislativeOption The purpose of this paper is to provide information about feebates. This paper discusses: what a feebate is, why Rocky Mountain Institute (RMI) believes a feebate is a valuable tool, recent analysis that RMI had done on feebates, what the current status of the feebate is, and how the feebate could interact with existing laws.

456

Assessment of Biomass Pelletization Options for Greensburg, Kansas |  

Broader source: Energy.gov (indexed) [DOE]

Assessment of Biomass Pelletization Options for Greensburg, Kansas Assessment of Biomass Pelletization Options for Greensburg, Kansas Assessment of Biomass Pelletization Options for Greensburg, Kansas This report provides an overview of a technical report on an assessment NREL conducted in Greensburg, Kansas, to identify potential opportunities to develop a biomass pelletization or briquetting plant in the region. See NREL/TP-7A2-45843 for the Executive Summary of this report. 48073.pdf More Documents & Publications Assessment of Biomass Pelletization Options for Greensburg, Kansas: Executive Summary Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices

457

NREL: Climate Neutral Research Campuses - Analyze Technology Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analyze Technology Options Analyze Technology Options An effective climate action plan follows a portfolio approach and addresses each energy sector on campus. This section outlines how various technology options would fit into a campus climate action plan and provides examples of how others have used these technologies. Links to definitions, technology basics, and references are also provided. Use the Climate Action Planning Tool to identify which options will lead to the most significant reductions in consumption of fossil fuels and in turn meet campus greenhouse gas reduction goals. People and Policy People and Policy Formulate policies that have a long-term effect on energy consumption and identify human behaviors that lower energy use and greenhouse gas emissions. Energy Conservation

458

Expert Meeting Report: Windows Options for New and Existing Homes |  

Broader source: Energy.gov (indexed) [DOE]

Windows Options for New and Existing Homes Windows Options for New and Existing Homes Expert Meeting Report: Windows Options for New and Existing Homes The NorthernSTAR Building America Partnership held an Expert Meeting on Windows Options for New and Existing Homes on November 14, 2011 at the Nolte Building on the campus of the University of Minnesota in Minneapolis, MN. Featured speakers included John Carmody and Pat Huelman of the University of Minnesota, Charlie Curcija of Lawrence Berkeley National Laboratory, Jim Larson of Cardinal Glass Industries, Peter Yost of Building Green, Peter Baker of Building Science Corporation, and Theresa Weston of Du Pont Innovations. Audience participation was actively encouraged during each presentation to uncover need and promote dialog among researchers and

459

DOE Exercises Option for Mission Support Contract | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Exercises Option for Mission Support Contract Exercises Option for Mission Support Contract DOE Exercises Option for Mission Support Contract December 16, 2013 - 12:00pm Addthis Media Contact Cameron Salony, DOE 509-376-0402, Cameron.Salony@rl.doe.gov Mission Support Alliance to Provide Site Services at Hanford through May 2017 WASHINGTON, DC - The Department of Energy (DOE) is extending Mission Support Alliance's (MSA) contract for infrastructure and site services at the Hanford Site in southeastern Washington state by three years. In 2009, following a competitive bid, DOE awarded MSA a cost-plus-award-fee contract valued at approximately $3 billion for up to 10 years, with a five-year base period. The department is exercising the first of two options for extension. The contract has been extended through May 2017 for

460

Mandatory Utility Green Power Option | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mandatory Utility Green Power Option Mandatory Utility Green Power Option Mandatory Utility Green Power Option < Back Eligibility Utility Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State New Mexico Program Type Mandatory Utility Green Power Option Provider New Mexico Public Regulation Commission In addition to meeting the requirements of the state [http://www.dsireusa.org/library/includes/incentive2.cfm?Incentive_Code=N... renewables portfolio standard], New Mexico investor-owned utilities (IOUs) are required to offer a voluntary program for purchasing renewable energy to customers. The voluntary renewable tariff may also allow consumers to purchase renewable energy within certain energy blocks and by source of

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

ABV most rational option for Kaposi's sarcoma in Brazil  

Science Journals Connector (OSTI)

A regimen of doxorubicin, bleomycin plus vincristine (ABV) seems to be the most rational treatment option for AIDS-related Kaposi's sarcoma in a resource-poor setting such as Brazil, say investigators from that...

2006-12-01T23:59:59.000Z

462

Required and Optional Metadata | Scientific and Technical Information...  

Office of Scientific and Technical Information (OSTI)

and Optional Metadata Print page Print page Metadata Provided to OSTI via AN 241.1 Web Metadata Provided to OSTI via Harvesting Metadata Provided to OSTI via Batch Upload...

463

Small Business Financing Options for Clean Energy Projects  

Broader source: Energy.gov [DOE]

Traditional financing options available to small businesses for clean energy projects, and the ways state and local governments can use funds to facilitate loans for energy efficiency and renewable energy projects in the small business sector.

464

Suite of Off-Grid Options in South Asia  

Science Journals Connector (OSTI)

This chapter provides a review of alternative off-grid electrification options in South Asia. It covers ... , regulatory governance and sustainability dimension of off-grid solutions. It concludes that in order t...

Subhes C. Bhattacharyya; Debajit Palit

2014-01-01T23:59:59.000Z

465

Local Option- Property Tax Credit for High Performance Buildings  

Broader source: Energy.gov [DOE]

Similar to Maryland's [http://www.dsireusa.org/library/includes/incentive2.cfm?Incentive_Code=M... Local Option Property Tax Credit for Renewable Energy], Title 9 of Maryland's property tax code...

466

Financing Non-Residential Photovoltaic Projects: Options and Implications  

E-Print Network [OSTI]

option embedded in a solar PPA or lease be priced no lowerit harder to sell solar PPAs or leases. 2) Credit Quality:post-flip). A lease enables the solar PPA provider to, in

Bolinger, Mark

2009-01-01T23:59:59.000Z

467

A New Spectral Element Method for Pricing European Options ...  

E-Print Network [OSTI]

Nov 11, 2011 ... Springer Science+Business Media, LLC (outside the USA) 2011 ...... Carr, P., Madan, D.B., Smith, R.H.: Option valuation using the fast Fourier...

2013-01-02T23:59:59.000Z

468

DESIGN OPTIONS FOR SMALL SCALE SHARED MEMORY MULTIPROCESSORS  

E-Print Network [OSTI]

i DESIGN OPTIONS FOR SMALL SCALE SHARED MEMORY MULTIPROCESSORS by Luiz André Barroso Copyright 1996 Luiz André Barroso #12;ii to Jacqueline Chame #12;iii Acknowledgments During my stay at USC I

Barroso, Luiz André

469

Pricing A Class of Multiasset Options using Information on Smaller ...  

E-Print Network [OSTI]

Mar 19, 2007 ... and Ghaoui [1], describes ?i by a known set of call option prices for a .... 1. Mr max p?P. (wpr xri ? zpr)), or equivalently the linear program:.

2007-03-19T23:59:59.000Z

470

Long Term Options for Energy Supply and Demand Side Management  

Science Journals Connector (OSTI)

A great deal has been said and written about future energy options and the need for responsibility and caution in protecting the worlds natural environment. Clearly, energy policies and environmental policies...

Tom Morron; Fred Denny

1993-01-01T23:59:59.000Z

471

An Analysis of Steam Process Heater Condensate Drainage Options  

E-Print Network [OSTI]

The production and reliability performance of Steam Process Heaters can be significantly affected by the condensate drainage design that is employed. There are currently a variety of drainage options which can be confusing to a system designer who...

Risko, J. R.

472

Early Draft Energy Policy and Financing Options to  

E-Print Network [OSTI]

.................................................................................................................. 6 3. HIDDEN BENEFITS OF SOLAR ENERGYEarly Draft Energy Policy and Financing Options to Achieve Solar Penetration Targets: Accounting the costs both of solar technology and of grid integration, so enabling solar deployment nationwide

473

Microsoft Word - Draft Option Mod Oct - Dec 2011 rev 1  

National Nuclear Security Administration (NNSA)

2006 to December 31, 2011, may be for period(s) from three months to five years. The Contracting Officer will determine the duration of these option period(s) at the time of...

474

The Options Approach to Software Prototyping Decisions 1  

E-Print Network [OSTI]

of a software design choice. Boehm [1] pioneered the use of techniques from statistical decision theory Bayesian decision theory to calcuThe Options Approach to Software Prototyping Decisions 1 Prasad Chalasani Somesh Jha Kevin Sullivan

475

Integrated Assessment of Energy-Options for CO2 Reduction  

Science Journals Connector (OSTI)

Energy technology options for CO2 reduction are evaluated in a process-oriented dynamic national costs minimizing LP-model of the Dutch energy system. To identify cost-effective CO2 reduction strategies two scena...

T. Kram; P. A. Okken

1989-01-01T23:59:59.000Z

476

Market making and risk management in options markets  

Science Journals Connector (OSTI)

This article examines the personal trading strategies of member proprietary traders in the natural gas futures options market. Trading activity is found to mirror previous findings in futures markets, specific...

Naomi E. Boyd

2014-11-01T23:59:59.000Z

477

Procurement Options for New Renewable Electricity Supply | Open Energy  

Open Energy Info (EERE)

Procurement Options for New Renewable Electricity Supply Procurement Options for New Renewable Electricity Supply Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Procurement Options for New Renewable Electricity Supply Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Renewable Energy Phase: Evaluate Options Topics: Finance, Low emission development planning, -LEDS Resource Type: Case studies/examples, Lessons learned/best practices, Technical report Website: nrelpubs.nrel.gov/Webtop/ws/nich/www/public/Record?rpp=25&upp=0&m=1&w= Cost: Free OpenEI Keyword(s): feed-in tariffs, renewable portfolio standards, FITs, FIT, RPS, renewable energy, procurement UN Region: Northern America Language: English Tool Overview "State renewable portfolio standard (RPS) policies require utilities and

478

Late Quaternary geomorphology and soils in Crater Flat, Yucca Mountain area, southern Nevada  

E-Print Network [OSTI]

Late Quaternary geomorphology and soils in Crater Flat, Yucca Mountain area, southern Nevada for a Crater Flat cation-leaching curve. This curve differs somewhat from a previous Yucca Mountain curve­10 from a previous ``surficial deposits'' stratigraphy used in the Yucca Mountain area. Although

Dorn, Ron

479

Self-Assembly of Flat Micro Components by Capillary Forces and Shape Recognition  

E-Print Network [OSTI]

Self-Assembly of Flat Micro Components by Capillary Forces and Shape Recognition J. Fang, S. Liang, K. Wang, X. Xiong, K. F. Böhringer* This paper summarizes our recent reports on self-assembly of flat micro components based on two major mechanisms: capillary-driven self-assembly and feature

480

Preliminary surficial geologic map of the Rocky Flats Plant and vicinity, Jefferson and Boulder Counties, Colorado  

SciTech Connect (OSTI)

This report contains a 1:6000 scale map of the 3-mile by 4-mile rectangular area surrounding the Rocky Flats Plant. The map shows the surface deposits estimated to be at least one meter thick. The accompanying report contains a detailed description of the map units, a discussion of the Rocky Flats alluvium and landslides, and cited references. 37 references.

Shroba, R.R.; Carrara, P.E.

1994-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "devices optional flat" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Relation of Flat Subduction to Magmatism and Deformation in the Western USA  

E-Print Network [OSTI]

Relation of Flat Subduction to Magmatism and Deformation in the Western USA Eugene Humphreys Department of Geological Sciences, University of Oregon, Eugene, Oregon, USA ABSTRACT Flat subduction of the Farallon plate beneath western USA during the Laramide orogeny was caused by the combined effects

Humphreys, Eugene

482

Sequestration Options for the West Coast States  

SciTech Connect (OSTI)

The West Coast Regional Carbon Sequestration Partnership (WESTCARB) is one of seven partnerships that have been established by the U.S. Department of Energy (DOE) to evaluate carbon capture and sequestration (CCS) technologies best suited for different regions of the country. The West Coast Region comprises Arizona, California, Nevada, Oregon, Washington, Alaska, and British Columbia. Led by the California Energy Commission, WESTCARB is a consortium of about 70 organizations, including state natural resource and environmental protection agencies; national laboratories and universities; private companies working on carbon dioxide (CO{sub 2}) capture, transportation, and storage technologies; utilities; oil and gas companies; nonprofit organizations; and policy/governance coordinating organizations. Both terrestrial and geologic sequestration options were evaluated in the Region during the 18-month Phase I project. A centralized Geographic Information System (GIS) database of stationary source, geologic and terrestrial sink data was developed. The GIS layer of source locations was attributed with CO{sub 2} emissions and other data and a spreadsheet was developed to estimate capture costs for the sources in the region. Phase I characterization of regional geological sinks shows that geologic storage opportunities exist in the WESTCARB region in each of the major technology areas: saline formations, oil and gas reservoirs, and coal beds. California offers outstanding sequestration opportunities because of its large capacity and the potential of value-added benefits from enhanced oil recovery (EOR) and enhanced gas recovery. The estimate for storage capacity of saline formations in the ten largest basins in California ranges from about 150 to about 500 Gt of CO{sub 2}, the potential CO{sub 2}-EOR storage was estimated to be 3.4 Gt, and the cumulative production from gas reservoirs suggests a CO{sub 2} storage capacity of 1.7 Gt. A GIS-based method for source-sink matching was implemented and preliminary marginal cost curves developed, which showed that 20, 40, or 80 Mega tonnes (Mt) of CO{sub 2} per year could be sequestered in California at a cost of $31/tonne (t), $35/t, or $50/t, respectively. Phase I also addressed key issues affecting deployment of CCS technologies, including storage-site monitoring, injection regulations, and health and environmental risks. A framework for screening and ranking candidate sites for geologic CO{sub 2} storage on the basis of HSE risk was developed. A webbased, state-by-state compilation of current regulations for injection wells, and permits/contracts for land use changes, was developed, and modeling studies were carried out to assess the application of a number of different geophysical techniques for monitoring geologic sequestration. Public outreach activities resulted in heightened awareness of sequestration among state, community and industry leaders in the Region. Assessment of the changes in carbon stocks in agricultural lands showed that Washington, Oregon and Arizona were CO{sub 2} sources for the period from 1987 to 1997. Over the same period, forest carbon stocks decreased in Washington, but increased in Oregon and Arizona. Results of the terrestrial supply curve analyses showed that afforestation of rangelands and crop lands offer major sequestration opportunities; at a price of $20 per t CO{sub 2}, more than 1,233 MMT could be sequestered over 40-years in Washington and more than 1,813 MMT could be sequestered in Oregon.

Larry Myer

2006-04-30T23:59:59.000Z

483

TCP HACK: TCP Header Checksum Option to Improve Performance over Lossy Links  

E-Print Network [OSTI]

In recent years, wireless networks have become increasingly common and an increasing number of devices are communicating with each other over lossy links. Unfortunately, TCP performs poorly over lossy links as it is unable to differentiate the loss due to packet corruption from that due to congestion. In this paper, we present an extension to TCP which enables TCP to distinguish packet corruption from congestion in lossy environments resulting in improved performance. We refer to this extension as the HeAder ChecKsum option (HACK). We implemented our algorithm in the Linux kernel and performed various tests to determine its effectiveness. Our results have shown that HACK performs substantially better than both SACK and NewReno in cases where burst corruptions are frequent. We also found that HACK can co-exist very nicely with SACK and performs even better with SACK enabled. Keywords -- Protocol Design, Protocol Analysis, Wireless Networks. I.

Rajesh Krishna Balan; Lee Boon Peng; K. Renjish Kumar; Lillykutty Jacob; Winston K. G. Seah; R. K. Balan; B. P. Lee; K. R. R. Kumar; L. Jacob; W. K. G. Seah; A. L. Ananda

2001-01-01T23:59:59.000Z

484

Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Field TesTing oF AcTivATed cArbon Field TesTing oF AcTivATed cArbon injecTion opTions For Mercury conTrol AT TXu's big brown sTATion Background The 2005 Clean Air Mercury Rule will require significant reductions in mercury emissions from coal-fired power plants. Lignite coal is unique because of its highly variable ash content (rich in alkali and alkaline-earth elements), high moisture levels, low chlorine content, and high calcium content. Unique to Texas lignite coals are relatively high iron and selenium concentrations. When combusting Texas lignite coals, up to 80 percent of the mercury in the flue gas is present as elemental mercury, which is not readily captured by downstream pollution control devices. To better understand the factors that influence mercury control at units firing

485

Universe Evolution in a 5D Ricci-flat Cosmology  

E-Print Network [OSTI]

We use Wetterich's parameterization equation of state (EOS) of dark energy to a $5D$ Ricci-flat cosmological solution and we suppose the universe contains three major components: matter, radiation and dark energy. By using the relation between the scale factor and the redshift $z$, we show that the two arbitrary functions contained in the $5D$ solution could be solved out analytically in terms of the variable $z$. Thus the whole $5D$ solution could be constructed uniquely if the current values of the three density parameters $\\Omega_{m0}$, ${\\Omega_{r0}}$, $\\Omega_{x0}$, the EOS $w_{0}$%, and the bending parameter $b$ contained in the EOS are all known. Furthermore, we find that all the evolutions of the mass density $\\Omega_{m} $, the radiation density ${\\Omega_{r}}$, the dark energy density $\\Omega_{x}$, and the deceleration parameter $q$ depend on the bending parameter $b$ sensitively. Therefore it is deserved to study observational constraints on the bending parameter $b$.

Chengwu Zhang; Hongya Liu; Lixin Xu; P. S. Wesson

2006-03-02T23:59:59.000Z

486

Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado  

SciTech Connect (OSTI)

This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

Not Available

1987-06-01T23:59:59.000Z

487

Washing of Rocky Flats Combustible Residues (Conducted March - May 1995)  

SciTech Connect (OSTI)

The scope of this project is to determine the feasibility of washing plutonium-containing combustible residues using ultrasonic disruption as a method for dislodging particulate. Removal of plutonium particulate and, to a lesser extent, solubilized plutonium from the organic substrate should substantially reduce potential fire, explosion or radioactive release hazards due to radiolytic hydrogen generation or high flammability. Tests were conducted on polypropylene filters which were used as pre-filters in the rich-residue ion-exchange process at the Los Alamos Plutonium Facility. These filters are similar to the Ful-Flo{reg_sign} cartridges used at Rocky Flats that make up a substantial fraction of the combustible residues with the highest hazard rating. Batch experiments were run on crushed filter material in order to determine the amount of Pu removed by stirring, stirring and sonication, and stirring and sonication with the introduction of Pu-chelating water-soluble polymers or surfactants. Significantly more Pu is removed using sonication and sonication with chelators than is removed with mechanical stirring alone.

Mary E. Barr; Ann R. Schake; David A. Romero; Gordon D. Jarvinen

1999-03-01T23:59:59.000Z

488

Dendrogeomorphic approach to estimating slope retreat, Maxey Flats, Kentucky  

SciTech Connect (OSTI)

A dendrogeomorphic study of slope retreat was conducted at the Maxey Flats nuclear-waste disposal site in northeastern Kentucky. Tree roots exposed by surface lowering were used as an indicator of ground surface at the time of germination. The amount of lowering was measured and divided by tree-ring-determined tree age. Surface lowering and slope degradation rates were estimated for three slopes below waste-burial trenches and compared with data obtained from sediment troughs and erosion frames at the site. Mean rates of slope retreat ranged from 1.92 to 3.16 mm/yr. Sediment-trough results are two to three orders of magnitude less than dendrogeomorphic and erosion-frame estimates of slope degradation, which suggests that piping and solution-weathering processes may be important in slope degradation. Slope aspect and declivity may be important factors affecting retreat of slopes with a uniform lithology. Dendrogeomorphic techniques provide results comparable to those in the literature and offer a rapid method for estimating slope retreat that integrates slope processes over many years.

Hupp, C.R. (Geological Survey, Reston, VA (USA)); Carey, W.P. (Geological Survey, Lakewood, CO (USA))

1990-07-01T23:59:59.000Z

489

Risk-Quantified Decision-Making at Rocky Flats  

SciTech Connect (OSTI)

Surface soils in the 903 Pad Lip Area of the Rocky Flats Environmental Technology Site (RFETS) were contaminated with {sup 239/240}Pu by site operations. To meet remediation goals, accurate definition of areas where {sup 239/240}Pu activity exceeded the threshold level of 50 pCi/g and those below 50- pCi/g needed definition. In addition, the confidence for remedial decisions needed to be quantified and displayed visually. Remedial objectives needed to achieve a 90 percent certainty that unremediated soils had less than a 10 percent chance of {sup 239/240}Pu activity exceeding 50-pCi/g. Removing areas where the chance of exceedance is greater than 10 percent creates a 90 percent confidence in the remedial effort results. To achieve the stipulated goals, the geostatistical approach of probability kriging (Myers 1997) was implemented. Lessons learnt: Geostatistical techniques provided a risk-quantified approach to remedial decision-making and provided visualizations of the excavation area. Error analysis demonstrated compliance and confirmed that more than sufficient soils were removed. Error analysis also illustrated that any soils above the threshold that were not removed would be of nominal activity. These quantitative approaches were useful from a regulatory, engineering, and stakeholder satisfaction perspective.

Myers, Jeffrey C. [Washington Safety Management Solutions, Aiken, South Carolina (United States)

2008-01-15T23:59:59.000Z

490

Seismic equipment qualification at Rocky Flats Plant: Lessons learned  

SciTech Connect (OSTI)

Seismic equipment qualification is being evaluated as a part of the Systematic Evaluation Program (SEP) at Rocky Flats Plant (RFP). Initially it was believed that the experience database developed by the Seismic Qualification Utility Group (SQUG) for commercial nuclear power plants, as outlined in their Generic Implementation Procedure (GIP), would provide a substantial benefit for the seismic adequacy verification of equipment at RFP. However, further review of the simplified guidelines contained in the GIP with respect to the specific RFP structures and components revealed substantial differences from the GIP criteria. Therefore, the number of ``outliers`` from the experience database defined in the GIP is greater than was initially anticipated. This paper presents details of the differences found between the RFP structures and components and those represented in the GIP, and the challenges presented for their evaluation at RFP. Approaches necessary to develop seismic verification data are also discussed. The discussions focus on experience with one of the nuclear facilities at RFP, Building 707. However, the conclusions are generally applicable to other similar facilities that typically comprise the RFP nuclear facilities.

Peregoy, W.; Herring, K.

1993-08-01T23:59:59.000Z

491

DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Certifies Rocky Flats Cleanup "Complete" Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife Refuge. "With today's announcement, the cleanup chapter of Rocky Flats' history is closed, while another equally important chapter is just being opened," said Deputy Secretary Sell. "This successful cleanup represents a triumph of determination and spirit of cooperation that stands as an example for

492

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Broader source: Energy.gov (indexed) [DOE]

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

493

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Broader source: Energy.gov (indexed) [DOE]

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

494

E-Print Network 3.0 - addressing mitigation options Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Assessing Greenhouse Gas Emissions and Assessing Mitigation Options for On... (GHG) mitigation options for on-road mobile sources from the perspective of DOTs, MPOs and...

495

Fuel vapor control device  

SciTech Connect (OSTI)

A fuel vapor control device is described having a valve opening and closing a passage connecting a carburetor and a charcoal canister according to a predetermined temperature. A first coil spring formed by a ''shape memory effect'' alloy is provided to urge the valve to open the passage when the temperature is high. A second coil spring urges the valve to close the passage. A solenoid is provided to urge an armature against the valve to close the passage against the force of the first coil spring when the engine is running. The solenoid heats the first coil spring to generate a spring force therein when the engine is running. When the engine is turned off, the solenoid is deactivated, and the force of the first spring overcomes the force of the second spring to open the passage until such time as the temperature of the first spring drops below the predetermined temperature.

Ota, I.; Nishimura, Y.; Nishio, S.; Yogo, K.

1987-10-20T23:59:59.000Z

496

Ceramics for fusion devices  

SciTech Connect (OSTI)

Ceramics are required for a number of applications in fusion devices, among the most critical of which are magnetic coil insulators, windows for RF heating systems, and structural uses. Radiation effects dominate consideration of candidate materials, although good pre-irradiation properties are a requisite. Materials and components can be optimized by careful control of chemical and microstructural content, and application of brittle material design and testing techniques. Future directions for research and development should include further extension of the data base in the areas of electrical, structural, and thermal properties; establishment of a fission neutron/fusion neutron correlation including transmutation gas effects; and development of new materials tailored to meet the specific needs of fusion reactors.

Clinard, F.W. Jr.

1984-01-01T23:59:59.000Z

497

False color viewing device  

DOE Patents [OSTI]

This invention consists of a viewing device for observing objects in near-infrared false-color comprising a pair of goggles with one or more filters in the apertures, and pads that engage the face for blocking stray light from the sides so that all light reaching, the user`s eyes come through the filters. The filters attenuate most visible light and pass near-infrared (having wavelengths longer than approximately 700 nm) and a small amount of blue-green and blue-violet (having wavelengths in the 500 to 520 nm and shorter than 435 nm, respectively). The goggles are useful for looking at vegetation to identify different species and for determining the health of the vegetation, and to detect some forms of camouflage.

Kronberg, J.W.

1991-05-08T23:59:59.000Z

498

Electrical safety device  

DOE Patents [OSTI]

An electrical safety device for use in power tools that is designed to automatically discontinue operation of the power tool upon physical contact of the tool with a concealed conductive material. A step down transformer is used to supply the operating power for a disconnect relay and a reset relay. When physical contact is made between the power tool and the conductive material, an electrical circuit through the disconnect relay is completed and the operation of the power tool is automatically interrupted. Once the contact between the tool and conductive material is broken, the power tool can be quickly and easily reactivated by a reset push button activating the reset relay. A remote reset is provided for convenience and efficiency of operation.

White, David B. (Greenock, PA)

1991-01-01T23:59:59.000Z

499

Analysis of offsite Emergency Planning Zones (EPZs) for the Rocky Flats Plant. Phase 3, Sitewide spectrum-of-accidents and bounding EPZ analysis  

SciTech Connect (OSTI)

During Phase 3 of the EPZ project, a sitewide analysis will be performed applying a spectrum-of-accidents approach to both radiological and nonradiological hazardous materials release scenarios. This analysis will include the MCA but will be wider in scope and will produce options for the State of Colorado for establishing a bounding EPZ that is intended to more comprehensively update the interim, preliminary EPZ developed in Phase 2. EG&G will propose use of a hazards assessment methodology that is consistent with the DOE Emergency Management Guide for Hazards Assessments and other methods required by DOE orders. This will include hazards, accident, safety, and risk analyses. Using this methodology, EG&G will develop technical analyses for a spectrum of accidents. The analyses will show the potential effects from the spectrum of accidents on the offsite population together with identification of offsite vulnerable zones and areas of concern. These analyses will incorporate state-of-the-art technology for accident analysis, atmospheric plume dispersion modeling, consequence analysis, and the application of these evaluations to the general public population at risk. The analyses will treat both radiological and nonradiological hazardous materials and mixtures of both released accidentally to the atmosphere. DOE/RFO will submit these results to the State of Colorado for the State`s use in determining offsite emergency planning zones for the Rocky Flats Plant. In addition, the results will be used for internal Rocky Flats Plant emergency planning.

Petrocchi, A.J.; Zimmerman, G.A.

1994-03-14T23:59:59.000Z

500

Disposable Electrochemical Immunosensor Diagnosis Device Based...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disposable Electrochemical Immunosensor Diagnosis Device Based on Nanoparticle Probe and Immunochromatographic Strip. Disposable Electrochemical Immunosensor Diagnosis Device Based...